Cities Index.
08-16-2022 Searchable Packet

Cupertino City Council
August 16, 2022

Document
08-16-2022 Searchable Packet
Meeting
August 16, 2022
Body
Cupertino City Council
Pages
15
Original file
116.8 MB
Text extracted from the city's file for reading and search. Open the original on cupertino.legistar.com. That file is the official record.

Therefore, implementation of the CAP Update and GHG Emissions Thresholds would result in an overall less-than-significant cumulative impact related to cultural resources. 69 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 599
CC 08-16-2022
599 of 1555
Environmental Checklist
Cultural Resources
Final Initial Study–Negative Declaration 61
This page intentionally left blank.
600
CC 08-16-2022
600 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 62 6 Energy
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact No Impact
Would the project:
a. Result in a potentially significant
environmental impact due to wasteful,
inefficient, or unnecessary consumption
of energy resources, during project
construction or operation? □ □ □ ■
b. Conflict with or obstruct a state or local
plan for renewable energy or energy
efficiency? □ □ □ ■
a. Would the project result in a potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources, during project construction or operation?
California is one of the lowest per-capita energy users in the United States, ranked 48th in the California is one of the lowest per-capita energy users in the United States, ranked 46th in the nation, due to its energy efficiency programs and mild climate.70 California consumed 279,510 gigawatt-hours (GWh) of electricity and 2,074,302 million cubic feet of natural gas in 2020.71,72 The single largest end-use sector for energy consumption in California is transportation (39.1 percent), followed by industry (23.5 percent), commercial (19.2 percent), and residential (18.3 percent).73 Adopted in 2018, SB 100 accelerates the State’s Renewable Portfolio Standards Program, codified in the Public Utilities Act, by requiring electricity providers to increase procurement from eligible renewable energy resources to 33 percent of total retail sales by 2020, 60 percent by 2030, and 100 percent by 2045.

The City of Cupertino has demonstrated its commitment to energy efficiency and renewable energy through many efforts, as described in the Existing Sustainability Setting section above. The City has adopted the California Green Building Standards Code (CALGreen), pursuant to CMC Chapter 16.58, Green Building Standards Code, which requires efficiency measures to reduce energy use and provide energy reduction benefits.74 The City has also completed communitywide GHG emissions inventories for years 2010 and 2018, including GHG emissions related to building energy and 70 U.S. Energy Information Administration (USEIA). 2021. “California - Profile Overview.” Last modified: February 18, 2021.

Available:<https://www.eia.gov/state/?sid=CA.> Accessed February 22, 2022. 71 CEC. 2020. Electricity Consumption by County. Available: <http://www.ecdms.energy.ca.gov/elecbycounty.aspx>. Accessed February 22, 2022.
72 USEIA. 2022. Natural Gas: Natural Gas Consumption by End Use. January 31, 2022. Available:
<https://www.eia.gov/dnav/ng/ng_cons_sum_dcu_SCA_a.htm>. Accessed February 22, 2022. 73 USEIA. 2021. “California - Profile Overview.” Last modified: February 18, 2021. Available:<https://www.eia.gov/state/?sid=CA.> Accessed February 22, 2022.
74 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 16.58. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 601
CC 08-16-2022
601 of 1555
Environmental Checklist
Cultural Resources
Final Initial Study–Negative Declaration 63
transportation fuel use, which are summarized in Table 1. Transportation (specifically on-road passenger and commercial vehicles) and building energy use (specifically residential and commercial electricity and natural gas use) were responsible for the most GHG emissions within the Cupertino community in 2018. Passenger and commercial vehicles in Cupertino accounted for 435,922,675 VMT in 2018. Residential, non-residential, and direct access electricity use in Cupertino totaled 317,448,722 kWh in 2018. Residential and non-residential natural gas use in Cupertino totaled 7,532,350 therms in 2018.75
The GHG Emissions Thresholds provide guidance during CEQA review and do not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to wasteful consumption of energy resources. The CAP Update is a policy document containing climate action strategies to reduce communitywide GHG emissions. The CAP Update would encourage energy efficiency and a transition away from natural gas use in existing residential and nonresidential building stock through new policies and educational campaigns as well as new requirements for proposed new buildings through Measures BE-2 through BE-4. The CAP Update would also incentivize increased use of renewable energy sources and renewable energy production and storage within Cupertino through Measures BE-1 and BE-5 and Actions BE-3.7 and BE-3.8. Additionally, the CAP Update would reduce transportation-related energy consumption by increasing active transportation and public transit use, reducing VMT, and reducing the use of gasoline vehicles through Measures TR-1 through TR-4.

Implementation of some CAP Update measures and actions, such as the installation of new active transportation infrastructure, would require small-scale construction. However, energy use for the construction of such projects would be temporary in nature, and construction equipment used would be typical of similar-sized construction projects in the region. In addition, construction contractors would be required to comply with the provisions of CCR Title 13 Sections 2449 and 2485, which would minimize unnecessary fuel consumption. Construction equipment would be subject to the United States Environmental Protection Agency (U.S. EPA) Construction Equipment Fuel Efficiency Standard, which would also minimize inefficient, wasteful, or unnecessary fuel consumption. Furthermore, pursuant to the applicable regulatory requirements such as the 2019 CALGreen (CCR Title 24, Part 11), future infrastructure projects would comply with construction waste management practices to divert a minimum of 65 percent of construction and demolition debris. These practices would result in efficient use of energy necessary to construct CAP Updaterelated projects. Upon completion of construction for any CAP Update-related infrastructure development and redevelopment, non-renewable energy use would be reduced by increasing renewable energy production and storage and reducing VMT within the City.

The purpose and intended effect of the CAP Update is to reduce GHG emissions generated within the Cupertino community to minimize the effects of climate change, including those emissions generated by energy demand and supply. The CAP Update would not result in the use of nonrenewable resources in a wasteful or inefficient manner; rather, it would assist in reducing use of non-renewable energy resources and increasing the production of local renewable energy.

Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to the wasteful, inefficient, or unnecessary consumption of energy. 75 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 602
CC 08-16-2022
602 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 64 b. Would the project conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
Relevant plans and policies that aim to increase energy efficiency and the production of renewable energy include SB 100, 2019 CALGreen (Title 24 Part 11), and 2019 California Building Energy Efficiency Standards (Title 24 Part 6). SB 100 supports the reduction of GHG emissions from the electricity sector by accelerating the State’s Renewables Portfolio Standard Program and requires electricity providers to increase procurement from eligible renewable energy resources to 33 percent of total retail sales by 2020, 60 percent by 2030, and 100 percent by 2045. CALGreen (Title 24 Part 11) institutes mandatory minimum environmental performance standards for all ground-up new construction of non-residential and residential structures. In addition, the California Building Energy Efficiency Standards (Title 24 Part 6) establishes energy-efficiency standards for residential and non-residential buildings in order to reduce California’s energy demand. CCR Title 24 (Parts 6 and 11) is updated periodically to incorporate and consider new energy-efficiency technologies and methodologies as they become available. New construction and major renovations must demonstrate their compliance with the current Building Energy Efficiency Standards through submission and approval of a Title 24 Compliance Report to the local building permit review authority and the CEC.

Cupertino is part of the SVCE, a Joint Powers Agreement which provides electricity primarily from clean, renewable sources. Cupertino would continue to reduce its use of nonrenewable energy resources as the electricity and power resources generated by renewable sources provided by SVCE continues to increase to comply with State requirements through SB 100, which requires electricity providers to increase procurement from eligible renewable energy resources to 33 percent of total retail sales by 2020, 60 percent by 2030, and 100 percent by 2045. The CAP Update includes measures and actions to reduce non-renewable electricity use and increase production and storage of renewable energy, as discussed further below, and would therefore align with the overall intent of SB 100.

In addition, the City of Cupertino has adopted CALGreen (Title 24 Part 11) and the California Building Energy Efficiency Standards (Title 24 Part 6) pursuant to CMC Title 16, Buildings and Construction.76 Therefore, construction and operation associated with infrastructure projects stemming from the CAP Update would be designed to comply with the energy source standards of the CALGreen and the California Building Energy Efficiency Standards. Future CAP Update projects would be required to demonstrate compliance with the CALGreen and the California Building Energy Efficiency Standards by implementing sustainability and energy efficiency measures such as high-efficiency lighting and HVAC systems, low-flow water fixtures, dual-paned windows, and water efficient landscaping and irrigation systems. Compliance with these regulations would minimize potential conflicts with adopted energy conservation plans.

As discussed under Response 6a., above, CAP Update Measures BE-2 through BE-4 seek to decrease non-renewable energy consumption in new and existing buildings by requiring electrification and phasing out natural gas use. Additionally, Measures BE-1 and BE-5 would decrease non-renewable energy use by reducing the non-SVCE usage and increasing the use of biofuels at the Apple campus, while Actions BE-3.7 and BE-3.8 would encourage the production and storage of local renewable energy. These measures and actions are consistent with the goals and policies established by SB 100, CALGreen, and the California Building Energy Efficiency Standards. Therefore, the CAP Update 76 Cupertino, City of. 2022. Cupertino Municipal Code Title 16. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 603
CC 08-16-2022
603 of 1555
Environmental Checklist
Cultural Resources
Final Initial Study–Negative Declaration 65
and GHG Emissions Thresholds would result in no impact related to consistency with State and local renewable energy and energy efficiency plans.

Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.77 As a guidance document, the GHG Emissions Thresholds would not result in any development or land use changes that could result in cumulative impacts. Implementation of the CAP Update would result in reducing the use of non-renewable energy resources across the community by phasing out natural gas use, increasing the use of the SVCE, and reducing gasoline vehicle use. Implementation of the CAP Update would also increase the production and storage of renewable energy within Cupertino by incentivizing the inclusion of small-scale solar and battery storage projects. As Cupertino’s population grows and development intensifies in the future, actions contained within the CAP Update would ensure that planned new development not related to the CAP Update is constructed to strict energy efficiency standards and that VMT is reduced. As the CAP Update would result in decreased non-renewable energy use within Cupertino and would align with existing plans and policies related to renewable energy and energy efficiency, implementation of the CAP Update and GHG Emissions Thresholds would result a no cumulative impact related to energy. 77 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 604
CC 08-16-2022
604 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 66 7 Geology and Soils
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Would the project:
a. Expose people or structures to potentially
substantial adverse effects, including the
risk of loss, injury, or death involving:

1. Rupture of a known earthquake fault,
as delineated on the most recent
Alquist-Priolo Earthquake Fault Zoning
Map issued by the State Geologist for
the area or based on other substantial
evidence of a known fault? □ □ □ ■

2. Strong seismic ground shaking? □ □ □ ■

3. Seismic-related ground failure,
including liquefaction? □ □ □ ■

4. Landslides? □ □ □ ■
b. Result in substantial soil erosion or the loss
of topsoil? □ □ ■ □
c. Be located on a geologic unit or soil that is
unstable, or that would become unstable as a
result of the project, and potentially result in
on- or off-site landslide, lateral spreading,
subsidence, liquefaction, or collapse? □ □ ■ □
d. Be located on expansive soil, as defined in
Table 1-B of the Uniform Building Code
(1994), creating substantial direct or indirect
risks to life or property? □ □ ■ □
e. Have soils incapable of adequately supporting
the use of septic tanks or alternative
wastewater disposal systems where sewers
are not available for the disposal of
wastewater? □ □ □ ■
f. Directly or indirectly destroy a unique
paleontological resource or site or unique
geologic feature? □ □ ■ □
605
CC 08-16-2022
605 of 1555
Environmental Checklist
Geology and Soils
Final Initial Study–Negative Declaration 67
a. Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving:
 Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault?
 Strong seismic ground shaking?
 Seismic-related ground failure, including liquefaction?  Landslides?
Cupertino is located in a seismically active region, and there are several active faults within the vicinity of Cupertino that could cause seismic-related impacts. The San Andreas Fault is the closest fault and is located approximately one mile southwest of the City at its closest approach. Other prominent faults in the area include the Hayward Fault located eight miles to the east and the San Gregorio Fault located 15 miles to the southwest.78 There are no Alquist-Priolo Fault Zones within Cupertino.79 According to the Cupertino General Plan EIR, there is minimal risk of fault rupture within Cupertino; however, earthquakes from the nearby faults have the potential to generate severe to violent ground shaking within the City.80 Areas of Cupertino susceptible to liquefaction are generally limited to lands adjacent to creeks such as Stevens, Regnart, and Calabazas Creeks and the majority of Cupertino has no to low potential for landslides except for in the Montebello Foothills at the western boundary of Cupertino. The majority of Cupertino is flat and not susceptible to landslides; however, western Cupertino within the Montebello Foothills and areas adjacent to steep banks along Stevens Creek are within mapped landslide hazard zones.81,82 In 2017, Santa Clara County, in partnership with Cupertino and the other incorporated cities within the County, adopted a Local Hazard Mitigation Plan (LHMP) to assess hazards and reduce risks prior to a disaster event, including seismic and geological hazards. In addition, the Cupertino General Plan Health and Safety Element provides goals, policies, and strategies to prepare for and minimize earthquake-related hazards.83
Although Cupertino is at risk of earthquake-induced ground shaking and associated hazards, the CAP Update is a policy document containing climate strategies and supporting actions to reduce GHG emissions and is consistent with the Cupertino General Plan, LHMP, and other regional and State seismic regulations. The CAP Update does not propose habitable development or policies that could result in exposure of people to potential substantial adverse effects, including the risk of loss, injury, or death involving rupture of a known earthquake fault, strong seismic ground shaking, seismicrelated ground failure including liquefaction, or landslides. Likewise, the GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning.

Thus, implementation of the GHG Emissions Thresholds would not result in construction or 78 Cupertino, City of. 2014. General Plan Appendix E: Geologic and Seismic Hazards. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 79 California Geological Survey. 2022. Earthquake Zones of Required Investigation. Available:
<https://maps.conservation.ca.gov/cgs/EQZApp/app/>. Accessed February 22, 2022. 80 Cupertino, City of. 2014. General Plan EIR. Available: <http://64.165.34.13/weblink/0/doc/391441/Electronic.aspx>. Accessed February 7, 2022.
81 Cupertino, City of. 2014. General Plan Appendix E: Geologic and Seismic Hazards. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 82 California Geological Survey. 2022. Earthquake Zones of Required Investigation. Available:
<https://maps.conservation.ca.gov/cgs/EQZApp/app/>. Accessed February 22, 2022. 83 Cupertino, City of. 2014. General Plan Health and Safety Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 606
CC 08-16-2022
606 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 68 operational impacts related to risk of loss, injury, or death involving rupture of a known earthquake fault, strong seismic ground shaking, seismic-related ground failure including liquefaction, or landslides. Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to seismic- and landslide-related hazards.
b. Would the project result in substantial soil erosion or the loss of topsoil? The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to substantial loss of topsoil. Likewise, the CAP Update would not involve land use or zoning changes but would promote sustainable infrastructure development. As a policy document, the CAP Update would not directly require ground-disturbing activities. However, implementation of several CAP Update actions may result in small-scale construction activities that could cause soil erosion or the loss of topsoil during construction. CAP Update Actions BE-2.4, BE-2.6, BE-2.7, BE-2.9 through BE-2.11, BE-3.1, BE-3.5, BE-3.6, and BE-3.8 promote electrification of existing residential and commercial buildings, which may require minor construction to modify the electrical and natural gas connections to existing buildings. CAP Update Actions TR-1.1 through TR-1.5 would encourage development of new bicycle infrastructure, which may involve construction activities to create new bike lanes and bike/pedestrian paths throughout Cupertino. CAP Update Actions TR-3.2, TR-3.4, and TR-3.12 would incentivize or require the installation of new EV charging stations. In addition, CAP Update Action CS-1.3 seeks to plant additional trees throughout Cupertino. As such, the CAP Update could result in construction-related soil erosion and topsoil loss impacts associated with such installations and plantings.

CAP Update projects and actions would be reviewed for consistency with CMC and other local and State erosion and grading regulations prior to final siting and construction. The potential for CAP Update project construction activities involving soil disturbance to result in increased erosion and sediment transport by stormwater to surface waters would be minimized, because future projects would be required to comply with CMC Chapter 16.08, Excavations, Grading, and Retaining Walls, and Chapter 9.18, Stormwater Pollution Prevention and Watershed Protection, which include erosion and sediment control standards, and/or a the National Pollutant Discharge Elimination System (NPDES) Construction General Permit provided by the Regional Water Quality Control Board.84,85 These regulations require BMPs such as the covering of graded slopes and stockpiled materials, storm drain protection, and use of fiber rolls and silt fences to reduce erosion and topsoil loss from stormwater runoff. Compliance with the CMC and/or Construction General Permit would ensure that BMPs are implemented during construction and minimize substantial soil erosion or the loss of topsoil. Therefore, the CAP Update and GHG Emissions Thresholds would result in a lessthan-significant impact related to soil erosion and loss of topsoil. 84 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 16.08. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 85 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 9.18. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 607
CC 08-16-2022
607 of 1555
Environmental Checklist
Geology and Soils
Final Initial Study–Negative Declaration 69
c. Would the project be located on a geologic unit or soil that is unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse?
d. Would the project be located on expansive soil, as defined in Table 1-B of the Uniform Building Code, creating substantial risks to life or property?
According to the Cupertino General Plan General Plan Health and Safety Element, potions of Cupertino subject to liquefaction are limited to the areas immediately adjacent to creeks and drainage features, such as Stevens Creek and Calabazas Creek. Most of Cupertino is characterized by low to no potential for landslides, other than in the areas within the Montebello Foothills and steep slopes associated with Stevens Creek.86 Expansive soils are known to be most prevalent in the northeastern portion of Cupertino, and soils throughout Cupertino may be characterized by other unstable properties and subject to subsidence or lateral spreading.87 The Cupertino General Plan Health and Safety Element, CMC, and California Building Code (CBC) contain regulations for structural design and soil hazards in order to mitigate potential impacts related to unstable soils.

The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to project location on an unstable geologic unit or soil. Likewise, the CAP Update is a policy document that does not propose specific development or land use changes. Some of the proposed measures and actions in the CAP Update would support small-scale construction projects, such as EV charging stations. However, CAP Update projects and actions would be reviewed for consistency with local and State geotechnical regulations prior to final siting and construction. New structures would be required to comply with CMC Chapter 16.04, Building Code, which adopts the latest CBC, including measures to address unstable soil conditions.88 Therefore, the CAP Update and GHG Emissions Thresholds would result in a less-thansignificant impact related to risks associated with unstable geologic units or soils. e. Would the project have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater?
The CAP Update and GHG Emissions Thresholds would not involve the development of habitable structures and, thus, no use of septic tanks or alternative wastewater disposal systems would be required. Therefore, no impact would occur related to soil capability support of alternative wastewater disposal systems.
f. Would the project directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
According to the Cupertino General Plan EIR, the majority of Cupertino overlies alluvium deposits of the Holocene, which are too recent to contain fossils. The western edge of Cupertino, within the Montebello Hills, contain quaternary non-marine terrace and Plio-Pleistocene non-marine deposits, 86 Cupertino, City of. 2014. General Plan Health and Safety Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 87 Cupertino, City of. 2014. General Plan EIR. Available: <http://64.165.34.13/weblink/0/doc/391441/Electronic.aspx>. Accessed February 7, 2022.
88 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 16.04. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 608
CC 08-16-2022
608 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 70 which have the potential to contain fossils.89 CMC Section 17.04.050(H), Paleontological Resources Permit Requirements, establishes requirements and procedures for the protection of paleontological resources during ground disturbing activities.90 The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to paleontological resources. Likewise, the CAP Update would not involve land use or zoning changes but would instead promote infrastructure development and redevelopment primarily within previously developed areas of Cupertino. As a policy document, the CAP Update would not directly result in impacts related to paleontological resources or unique geologic features. CAP Update measures and actions that would involve construction activities, such as those related to building electrification retrofits and EV charging infrastructure, would involve work within existing, previously graded and disturbed areas where the likelihood of encountering intact and previously undiscovered paleontological resources would be minimal. In general, CAP Update projects would be located and designed to reduce ground disturbance to the maximum extent possible. Nonetheless, there is a possibility that small-scale construction projects may expose paleontological resources during ground-disturbing activities. To reduce such risks, future CAP Update-related projects and actions would be reviewed for consistency with geotechnical and paleontological regulations prior to final siting and construction.

CAP Update projects would also be required to implement BMPs in accordance with CMC Section

17.04.050(H), Paleontological Resources Permit Requirements, that requires implementation of best practices when previously undiscovered paleontological resources are unearthed during project construction.91 Therefore, the CAP Update and GHG Emissions Thresholds would result in a lessthan-significant impact related to paleontological resources or unique geologic features.

Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.92 As a guidance document, the GHG Emissions Thresholds would not result in any development or land use changes that could result in cumulative impacts. However, planned, proposed, and approved projects assumed under General Plan buildout in combination with future CAP Update-related projects could expose additional people and property to seismic and geologic hazards that are present in the region. The magnitude of geologic hazards for individual projects, including those associated with implementation of the CAP Update, would depend upon the location, type, and size of development and the specific hazards associated with individual sites. Specific geologic hazards associated with individual project sites would be limited to those sites without affecting other areas. Similarly, potential impacts to paleontological resources associated with each individual site would be limited to that site without affecting other areas, and impacts related to these resources would be minimized on a case-by-case basis. Compliance with existing regulations, including CBC requirements, City-issued permit requirements, the Cupertino General Plan, the CMC, and/or Construction General Permit requirements, would minimize potential cumulative seismic and 89 Cupertino, City of. 2014. General Plan EIR. Available: <http://64.165.34.13/weblink/0/doc/391441/Electronic.aspx>. Accessed February 7, 2022.
90 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 17.04. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 91 Ibid.
92 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 609
CC 08-16-2022
609 of 1555
Environmental Checklist
Geology and Soils
Final Initial Study–Negative Declaration 71
geologic impacts. Seismic and geologic hazards and paleontological resources would be addressed on a case-by-case basis and would not result in cumulative impacts. Therefore, implementation of the CAP Update and GHG Emissions Thresholds would result in an overall less-than-significant cumulative impact related to geology and soils.
610
CC 08-16-2022
610 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 72 8 Greenhouse Gas Emissions
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Would the project:
a. Generate greenhouse gas emissions, either
directly or indirectly, that may have a
significant impact on the environment? □ □ □ ■
b. Conflict with any applicable plan, policy, or
regulation adopted to reduce the emissions
of greenhouse gases? □ □ □ ■
a. Would the project generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment?
The greenhouse effect is a natural occurrence that helps regulate the temperature of the Earth. The majority of radiation from the sun hits Earth’s surface and warms it. The surface in turn radiates heat back towards the atmosphere, known as infrared radiation. Gases and clouds in the atmosphere trap and prevent some of this heat from escaping into space and re-radiate it in all directions. This process is essential to support life on Earth, because it warms the planet by approximately 60°F. Emissions from human activities since the beginning of the industrial revolution (approximately 270 years ago) have been adding to the natural greenhouse effect by resulting in increased gases in the atmosphere that trap heat and contribute to an average increase in Earth’s temperature. Global warming is the observed increase in the average temperature of the Earth’s surface, and climate change is the resultant change in wind patterns, precipitation, and storms over an extended period.

GHGs produced by human activities include CO2, methane (CH4), nitrous oxide (N2O), sulfur hexafluoride, hydroflourocarcons, and perfluorinated compound (see Appendix B for details related to these GHG gases).93 Combustion of fossil fuels (gasoline, natural gas, and coal), deforestation, and decomposition of waste release carbon into the atmosphere that had been locked underground and stored in oil, gas, and other hydrocarbon deposits or in the biomass of surface vegetation. Since 1750, estimated concentrations of CO2, CH4, and N2O in the atmosphere have increased by over 36 percent, 148 percent, and 18 percent respectively, primarily due to human activity. Emissions of GHGs affect the atmosphere directly by changing its chemical composition.

Changes to the land surface also indirectly affect the atmosphere by changing the way in which Earth absorbs gases from the atmosphere. Potential impacts in California due to climate change include sea level rise, more extreme-heat days and high-ozone days, larger and more frequent 93 The CAP Update only considers emissions of CO2, CH4, and N2O, because these are the GHGs most relevant to local government policymaking. These gases comprise a large majority of GHG emissions at the community level. The remaining gases are emitted primarily in private sector manufacturing and electricity transmission and are the subject of regulation at the State level. Therefore, these gases were omitted from the CAP Update.
611
CC 08-16-2022
611 of 1555
Environmental Checklist
Greenhouse Gas Emissions
Final Initial Study–Negative Declaration 73
forest fires, and more frequent and severe drought years.94 Although GHG emissions do not typically cause direct health impacts at a local level, GHG emissions can result in indirect health impacts by contributing to climate change, which can have public health implications. The primary public health impacts of climate change include the following:
 Increased incidences of hospitalization and deaths due to increased incidences of extreme heat events;
 Increased incidences of health impacts related to ground-level ozone pollution due to increased average temperatures that facilitate ozone formation;
 Increased incidences of respiratory illnesses from wildfire smoke due to increased incidences of wildfires;
 Increased vector-borne diseases due to the growing extent of warm climates; and  Increased stress and mental trauma due to extreme events and disasters, economic disruptions, and residential displacement.95
Cupertino has completed communitywide GHG emissions inventories for 2010 and 2018, which are summarized in Table 1. Table 1 also provides estimated 1990 emissions levels for informational purposes. The transportation sector was the largest contributor to Cupertino’s GHG emissions, followed by the energy sector. Figure 4 and Table 4 summarize the communitywide GHG emissions forecast under three scenarios: 1) business-as-usual projections, 2) business-as-usual projections with State measures, and 3) the City of Cupertino target reduction path along with State measures.

As shown therein, under the business-as-usual scenario, communitywide GHG emissions are forecasted to increase to approximately 379,192 MT of CO2e (5.77 MT of CO2e per capita) by the year 2030, based on anticipated economic and population growth. However, with implementation of State laws and programs, communitywide GHG emissions would decline to approximately 331,247 MT of CO2e (5.04 MT of CO2e per capita) by 2030. Implementation of the CAP Update alongside State laws and programs would reduce communitywide GHG emissions to approximately 222,436 MT of CO2e (3.39 MT of CO2e per capita) by 2030.

The strategies included in the CAP Update combined with State-wide legislation and initiatives will enable the City of Cupertino to meet its target of reducing communitywide GHG emissions output to 222,867 MT of CO2e by 2030, which represents a 45 percent reduction below 1990 levels. This exceeds the SB 32 target for 2030 to reduce total GHG emissions 40 percent below 1990 levels. In addition, Cupertino has a longer-term goal of achieving carbon neutrality by 2040 and has proposed the CAP Update as a pathway to make progress toward this goal. As shown in Table 3 and Table 4, implementation of the CAP Update would achieve an approximately 45 percent reduction in communitywide GHG emissions below 1990 levels by 2030 and an approximately 83 percent reduction in communitywide GHG emissions below 1990 levels by 2040. Therefore, the City goal of carbon neutrality and the associated CAP Update establish a trajectory that provide GHG emissions reductions greater than those required by SB 32 for 2030. Because SB 32 is considered an interim target toward meeting the 2045 State goal of carbon neutrality, implementation of the CAP Update would be considered substantial progress toward meeting the State’s long-term 2045 goal. Avoiding interference with, and making substantial progress toward, these long-term State targets is 94 CARB and California Environmental Protection Agency (CalEPA). 2009. Environmental Health and Equity Impacts from Climate Change and Mitigation Policies in California: A Review of the Literature. Available:
<http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.386.4605&rep=rep1&type=pdf>. Accessed February 23, 2022. 95 State of California. 2018. California’s Fourth Climate Change Assessment Statewide Summary Report. Available:
<http://www.climateassessment.ca.gov/state/>. Accessed February 23, 2022. 612
CC 08-16-2022
612 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 74 important, because these targets have been set at levels that achieve California’s fair share of international emissions reduction targets that will stabilize global climate change effects and help avoid the associated adverse environmental consequences.

The CAP Update includes a list of 27 measures and their associated actions intended to reduce communitywide GHG emissions. Implementation of the CAP Update would result in the reduction of communitywide operational GHG emissions, while only generating temporary GHG emissions during construction of infrastructure such as EV charging stations and building energy efficiency upgrades.

Additionally, the CAP Update would serve as a pathway to reduce GHG emissions and introduce other beneficial environmental and sustainability effects. These benefits include reduction in building energy consumption, vehicle miles traveled (and thus air pollution), and solid waste generation. The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning and, thus, would not result in construction or operational impacts related to GHG emissions. The GHG Emissions Thresholds would establish GHG emissions targets and analysis methodologies consistent with the goals established by the CAP Update that are enforced during CEQA review with the intention of reducing GHG emissions associated with construction and operation of future projects and plans in Cupertino. Therefore, the CAP Update and GHG Emissions Thresholds would result in a no impact related to generation of GHG emissions.
b. Would the project conflict with any applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
The CARB 2017 Climate Change Scoping Plan outlines a pathway to achieving the 2030 reduction targets set under SB 32, which are considered interim targets toward meeting the long-term 2045 carbon neutrality goal established by EO B-55-18. The CAP Update and GHG Emissions Thresholds are policy-level documents that establish measures and policies to reduce GHG emissions within Cupertino in an effort to also comply with State regulations. As discussed under Response 8a. above, the CAP Update includes strategies that would reduce Cupertino GHG emissions to 45 percent below 1990 levels by 2030 and to 83 percent below 1990 levels by 2040. The purpose of the CAP Update is to meet Cupertino’s proportionate fair share of the Statewide GHG emissions reduction target set by SB 32 and work toward the State’s longer-term target of carbon neutrality identified in California Executive Order B-55-18.

The CAP Update would not conflict with any applicable GHG reduction plans, including the CARB 2017 Climate Change Scoping Plan. Rather, the CAP Update identifies how Cupertino would achieve consistency with the Statewide GHG emissions limit and would serve as a pathway to reduce GHG emissions and introduce other beneficial environmental and sustainability effects. These benefits include reduction in building energy consumption, vehicle miles traveled (and thus air pollution), and solid waste generation. The CAP Update creates a GHG emissions reduction strategy consistent with Section 15183.5 of the CEQA Guidelines for the City of Cupertino. Likewise, the GHG Emissions Thresholds would establish GHG emissions targets and analysis methodologies consistent with the CAP Update and would be enforced during CEQA review with the intention of reducing GHG emissions associated with construction and operation of future projects and plans in Cupertino. Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to consistency with applicable GHG emissions reduction plans, policies, and regulations. 613
CC 08-16-2022
613 of 1555
Environmental Checklist
Greenhouse Gas Emissions
Final Initial Study–Negative Declaration 75
Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.96 Analyses of GHG emissions and climate change are cumulative in nature, as they affect the accumulation of GHG emissions in the atmosphere. Cumulative projects under Cupertino General Plan buildout that exceed the thresholds discussed above would have a significant impact related to GHG emissions and climate change, both individually and cumulatively. The CAP Update creates a GHG emissions reduction strategy consistent with Section 15183.5 of the CEQA Guidelines for the City of Cupertino.

The CAP Update also includes a series of measures and actions that are intended to reduce communitywide GHG emissions to 45 percent below 1990 levels by 2030, with a goal of carbon neutrality by 2040, which provides substantial progress toward Cupertino meeting State goals. As such, the CAP Update would result in the overall reduction of GHG emissions. Some GHG emissions would occur during construction of CAP Update-related infrastructure projects; however, these emissions would be temporary and minor in nature. Furthermore, as a guidance document, the GHG Emissions Thresholds would not result in cumulative impacts. Rather, the GHG Emissions Thresholds would establish GHG emissions targets and analysis methodologies that are enforced during CEQA review with the intention of reducing GHG emissions associated with construction and operation of cumulative buildout. Therefore, implementation of the CAP Update and GHG Emissions Thresholds would result in an overall less-than-significant cumulative impact related to GHG emissions. 96 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 614
CC 08-16-2022
614 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 76 9 Hazards and Hazardous Materials
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Would the project:
a. Create a significant hazard to the public or
the environment through the routine
transport, use, or disposal of hazardous
materials? □ □ ■ □
b. Create a significant hazard to the public or
the environment through reasonably
foreseeable upset and accident conditions
involving the release of hazardous
materials into the environment? □ □ ■ □
c. Emit hazardous emissions or handle
hazardous or acutely hazardous materials,
substances, or waste within 0.25 mile of an
existing or proposed school? □ □ ■ □
d. Be located on a site that is included on a list
of hazardous material sites compiled
pursuant to Government Code Section
65962.5 and, as a result, would it create a
significant hazard to the public or the
environment? □ □ ■ □
e. For a project located in an airport land use
plan or, where such a plan has not been
adopted, within two miles of a public
airport or public use airport, would the
project result in a safety hazard or
excessive noise for people residing or
working in the project area? □ □ □ ■
f. Impair implementation of or physically
interfere with an adopted emergency
response plan or emergency evacuation
plan? □ □ □ ■
g. Expose people or structures, either directly or
indirectly, to a significant risk of loss, injury,
or death involving wildland fires? □ □ □ ■
615
CC 08-16-2022
615 of 1555
Environmental Checklist
Hazards and Hazardous Materials
Final Initial Study–Negative Declaration 77
a. Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? b. Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to hazardous materials. The CAP Update is a policy document containing measures and actions to reduce GHG emissions. The CAP Update does not involve identified site-specific development and, for the most part, it would not facilitate new development that would involve the routine use of hazardous materials. Implementation of some of the CAP Update actions, such as building electrification retrofits and installation of EV charging stations, would require construction activities. Construction would involve the temporary use of hazardous materials such as vehicle fuels and fluids that could be released should an accidental leak or spill occur. However, these types of materials are not considered acutely hazardous, and storage, handling, and disposal of these materials are regulated by the California Department of Toxic Substances Control, U.S. EPA, and Occupational Safety & Health Administration. In addition, standard construction BMPs for the use and handling of such materials would avoid or reduce the potential for such conditions to occur. Any use of potentially hazardous materials during construction of projects would comply with all local, State, and federal regulations regarding the handling of potentially hazardous materials, including Title 49 of the Code of Federal Regulations and Title 22, Division 4.5 of the CCR. Risk of spills would cease after construction is completed.

Therefore, construction activities related to CAP Update actions would not be anticipated to create upset and accident conditions involving the release of hazardous materials, and operation of the majority of CAP Update-related projects would not involve the routine transport, use, or disposal of hazardous materials during operation.

However, CAP Update Actions BE-3.7 and BE-3.8 emphasize increasing local renewable energy production and battery energy storage facilities within Cupertino by encouraging commercial developments to include small-scale solar and/or battery storage systems in their design. Hazardous materials used in battery energy storage systems would generally consist of the lithium-ion batteries. Lithium-ion technology is a common battery storage medium and is considered one of the safest and most efficient methods of energy storage on the market. During normal operation, lithium-ion batteries do not represent a risk to off-site receptors, and safety standards applicable to energy storage facilities and safety certification tests established by independent bodies, such as Underwriters Laboratories, National Fire Protection Association, and International Electrotechnical Commission would prevent any reasonable possibility of a substantial adverse effect on the environment related to the lithium-ion batteries. However, in the unlikely event of a fire, there is a risk of the accidental release of hazardous materials associated with battery energy storage systems. Any future proposed battery energy storage facilities would, therefore, be carefully reviewed for appropriate locations, safety measures, and consistency with the Cupertino General Plan, CMC, and applicable local, State, and federal regulations. Therefore, the CAP Update and GHG Emissions Thresholds would result in a less-than-significant impact related to creating a significant hazard through the routine transport, use, or disposal of hazardous materials and reasonably foreseeable upset and accident conditions involving the release of hazardous materials. 616
CC 08-16-2022
616 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 78 c. Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within 0.25 mile of an existing or proposed school? The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to handling hazardous materials in the vicinity of schools. Likewise, the CAP Update is a policy containing strategies to reduce GHG emissions. The CAP Update does not include site-specific proposals and development, nor would it emit or handle hazardous materials. Implementing some CAP Update actions may require future development or improvements, such as EV charging stations, small scale battery energy storage, and building improvements related to electrification. However, CAP Update projects and actions would be reviewed to ensure the appropriate location of projects in relation to existing development in Cupertino and would be reviewed for consistency with the Cupertino General Plan, CMC, and applicable local, State, and federal regulations. Therefore, the CAP Update and GHG Thresholds would result in a less-than-significant impact related to handling of hazardous materials within 0.25 mile of schools.
d. Would the project be located on a site included on a list of hazardous material sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to project site location on a site listed on a hazardous material site. Likewise, the CAP Update is a policy document containing actions and supporting measures to reduce GHG emissions and does not propose land use changes. The proposed CAP Update does not include site-specific proposals and development, but CAP measures and actions could result in future projects that could be located on a listed hazardous materials site.

However, CAP Update projects and actions would be reviewed to ensure the appropriate location of projects in relation to existing development in Cupertino and would be reviewed for consistency with the Cupertino General Plan and CMC Chapter 17.04, Standard Environmental Protection Requirements, which establishes requirements for completing environmental assessments to determine the potential for site contaminations and permitting requirements if contamination is present on a site.97 In addition, future CAP Update projects would be required to comply with all other applicable local, State, and federal regulations pertaining to hazardous materials, such as those discussed under Response 9a. Therefore, the CAP Update and GHG Thresholds would result in a less-than-significant impact related to location on a listed hazardous materials site. e. For a project located in an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? Cupertino does not contain any airports. The nearest airport to Cupertino is the San Jose International Airport, located approximately four miles northeast of the Cupertino city limits boundary. Furthermore, the GHG Emissions Thresholds and CAP Update are policy documents that would not increase airport activity or result in additional habitable development or commercial development that could increase potential exposure of residents and employees to aircraft-related 97 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 17.04. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 617
CC 08-16-2022
617 of 1555
Environmental Checklist
Hazards and Hazardous Materials
Final Initial Study–Negative Declaration 79
hazards. Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to risks associated with location proximate to a public airport. f. Would the project impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
The CAP Update and GHG Emissions Thresholds are policy documents intended to reduce GHG emissions. The proposed CAP Update and GHG Emissions Thresholds do not involve site-specific development, nor would they facilitate new development that would interfere with adopted emergency plans. Implementation of some CAP Update measures, such as Measure TR-1 which would provide for the addition of new bicycle and pedestrian infrastructure, may involve construction within the local right-of-way. Construction activities have the potential to require lane closures and may impact traffic and vehicle speeds on the affected roadways; however, these impacts would be temporary and access to roadways would be maintained throughout project construction. Furthermore, future projects involving work in the public right-of-way would be required to coordinate with the City to ensure appropriate construction staging and adequate vehicular and pedestrian access on adjacent roadways, pursuant to CMC Chapter 14.08, Encroachments and Use of City Rights-of-Way.98 Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to impairment or interference with implementation of an emergency response or evacuation plan.
g. Would the project expose people or structures, either directly or indirectly, to a significant risk of loss, injury, or death involving wildland fires?
According to the Cupertino General Plan Health and Safety Element, the majority of Cupertino is urbanized and is at low risk of wildland fire. Areas of Cupertino susceptible to wildland fire are limited to the western boundary of Cupertino within the Montebello Foothills.99 The CAP Update and GHG Emissions Thresholds do not propose specific development or new residential or commercial land uses that could be subject to wildland fire, nor would they result other physical changes to the environment that could increase the risk of a wildland fire. In addition, the CAP Update includes Measures AR-2 and AR-3 to improve community preparedness and response to climate-related hazards, including wildfire and associate air pollution risks. Therefore, the Update and GHG Emissions Thresholds would result in no impact related to risks associated with exposure to wildland fires.

Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.100 As a guidance document, the GHG Emissions Thresholds would not result in any development or land use changes that could result in cumulative impacts related to hazardous materials and hazards. Hazards and hazardous materials impacts are typically site-specific in nature. CAP Update projects, in combination with other cumulative projects anticipated under Cupertino General Plan buildout, are 98 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 14.08. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 99 Cupertino, City of. 2014. General Plan Health and Safety Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 100 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 618
CC 08-16-2022
618 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 80 not anticipated to contribute to cumulative hazards and hazardous materials impacts with adherence to applicable Cupertino General Plan policies, CMC requirements, and State and federal regulatory requirements. Therefore, implementation of the CAP Update and GHG Emissions Thresholds would result in a less-than-significant cumulative impact related to hazards and hazardous materials.
619
CC 08-16-2022
619 of 1555
Environmental Checklist
Hazards and Hazardous Materials
Final Initial Study–Negative Declaration 81
This page intentionally left blank.
620
CC 08-16-2022
620 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 82 10 Hydrology and Water Quality
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Would the project:
a. Violate any water quality standards or
waste discharge requirements or otherwise
substantially degrade surface or
groundwater quality? □ □ ■ □
b. Substantially decrease groundwater
supplies or interfere substantially with
groundwater recharge such that the
project may impede sustainable
groundwater management of the basin? □ □ □ ■
c. Substantially alter the existing drainage
pattern of the site or area, including
through the alteration of the course of a
stream or river or through the addition of
impervious surfaces, in a manner which
would: □ □ ■ □
(i) Result in substantial erosion or siltation
on- or off-site; □ □ ■ □
(ii) Substantially increase the rate or
amount of surface runoff in a manner
which would result in flooding on- or
off-site; □ □ ■ □
(iii) Create or contribute runoff water
which would exceed the capacity of
existing or planned stormwater
drainage systems or provide
substantial additional sources of
polluted runoff; or □ □ ■ □
(iv) Impede or redirect flood flows? □ □ ■ □
d. In flood hazard, tsunami, or seiche zones,
risk release of pollutants due to project
inundation? □ □ ■ □
e. Conflict with or obstruct implementation of
a water quality control plan or sustainable
groundwater management plan? □ □ □ ■
621
CC 08-16-2022
621 of 1555
Environmental Checklist
Hydrology and Water Quality
Final Initial Study–Negative Declaration 83
a. Would the project violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality? The GHG Emissions Thresholds is a guidance document as does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to water quality standards. Likewise, the CAP Update is a policy document containing actions intended to reduce GHG emissions within Cupertino and does not propose specific development or land use changes. CAP Update Actions BE-2.4, BE-2.6, BE-2.7, BE-2.9 through BE-2.11, BE-3.1, BE-3.5, BE-3.6, and BE-3.8 promote electrification of existing residential and commercial buildings, which may require minor construction to modify the electrical and natural gas connections to existing buildings. CAP Update Actions TR-1.1 through TR-1.5 would encourage development of new bicycle infrastructure, which may involve construction activities to create new bike lanes and bike/pedestrian paths throughout Cupertino. CAP Update Actions TR-3.2, TR-3.4, and TR-3.12 would incentivize or require the installation of new EV charging stations. In addition, CAP Update Action CS-1.3 seeks to plant additional trees throughout Cupertino, which may require the use of construction equipment for the moving and placement of trees. These actions may result in small scale construction activities in the future that could result in temporary water quality impacts due to soil erosion and ground disturbance, as further discussed under Response 10c and in Section 7, Geology and Soils.

However, CAP Update projects and actions would be reviewed for consistency with local and State regulations, including the NPDES permitting program that requires implementation of Stormwater Pollution Prevention Plans (SWPPPs) and the CMC Chapter 16.08, Excavations, Grading, and Retaining Walls, and CMC Chapter 9.18, Stormwater Pollution Prevention and Watershed Protection, that include erosion and sediment control standards.101,102 These regulations require BMPs to reduce water quality impacts from construction activities. Compliance with the CMC and/or NPDES permitting program would ensure that BMPs are implemented during construction to minimize potential impacts to surface and groundwater quality. As such, the CAP Update’s related infrastructure and retrofit projects would not result in new or different wastewater discharge that would violate water quality standards, waste discharge requirements, or otherwise degrade surface or groundwater quality. Therefore, the CAP Update and GHG Emissions Thresholds would result in a less-than-significant impact related to surface or groundwater water quality in Cupertino. b. Would the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to groundwater supplies. Likewise, the CAP Update does not propose development or land use changes, but rather is a policy document containing strategies intended to reduce GHG emissions and increase sustainability. CAP Update Measure WW-1 seeks to decrease community water use through water efficiency retrofits and sustainable landscaping and irrigation. Reduced water use within Cupertino would aid in maintaining groundwater supplies. Additionally, the CAP Update includes Measure CS-1 which 101 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 16.08. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 102 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 9.18. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 622
CC 08-16-2022
622 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 84 facilitates the preparation of an Urban Forest Master Plan and requires planting and maintaining new trees throughout Cupertino. Encouragement of tree planting and thus provision of pervious areas in Cupertino would increase groundwater recharge. As such, implementing the CAP Update would have a beneficial effect related to local groundwater recharge as well as support groundwater management in Cupertino. Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to impedance of sustainable groundwater management. c. Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
 Result in substantial erosion or siltation on- or off-site?  Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site?
 Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff?  Impede or redirect flood flows?
The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to alterations in drainage patterns and impervious surfaces. Likewise, the CAP Update does not propose specific development or land use changes, but rather emphasizes strategies intended to reduce GHG emissions and increase sustainability in Cupertino. Implementation of several CAP Update measures and actions may promote infrastructure development and small-scale construction activities within Cupertino. CAP Update Actions BE-2.4, BE-2.6, BE-2.7, BE-2.9 through BE-2.11, BE-3.1, BE-3.5, BE-3.6, and BE-3.8 promote electrification of existing residential and commercial buildings, which may require minor construction to modify the electrical and natural gas connections to existing buildings. CAP Update Actions TR-1.1 through TR-1.5 would encourage development of new bicycle infrastructure, which may involve construction activities to create new bike lanes and bike/pedestrian paths throughout Cupertino. CAP Update Actions TR-3.2, TR-3.4, and TR-3.12 would incentivize or require the installation of new EV charging stations. In addition, CAP Update Action CS-1.3 seeks to plant additional trees throughout Cupertino, which may require the use of construction equipment for the moving and placement of trees.

Implementation of these CAP Update actions would primarily occur within previously developed areas and would not result in substantial alterations to Cupertino’s existing drainage pattern and amount of impervious surface. Construction of CAP Update projects could result in erosion as discussed in Section 7, Geology and Soils. However, impacts to drainage and water quality during construction would be minimized through the implementation of BMPs as required by the CMC and NPDES Construction General Permit program. In addition, CAP Update projects would be in accordance with the Cupertino General Plan Environmental Resources Element, which includes goals and policies for the protection and preservation of creeks, streams, and groundwater within Cupertino.103 Furthermore, CAP Update Measure CS-1 would increase trees and associated permeable surfaces within Cupertino, which would improve drainage and water quality. Therefore, the CAP Update and GHG Emissions Thresholds would not substantially alter drainage patterns or 103 Cupertino, City of. 2014. General Plan Environmental Resources and Sustainability Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 623
CC 08-16-2022
623 of 1555
Environmental Checklist
Hydrology and Water Quality
Final Initial Study–Negative Declaration 85
impervious surface within Cupertino and impacts related to erosion, flooding, and polluted runoff would be less-than-significant impact.
d. Would the project result in flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?
Cupertino is not located within designated seiche or tsunami zones. A small portion of Cupertino is within the 100-year flood zone and most of the western and central areas of Cupertino are within the 500-year flood zone defined by Federal Emergency Management Agency (FEMA).104 Therefore, areas of Cupertino are at risk of flooding.

The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to flooding and the risk of pollutants. Likewise, the CAP Update does not propose specific development or land use changes, but rather emphasizes strategies intended to reduce GHG emissions and increase sustainability in Cupertino.

Implementation of several CAP Update measures and actions may promote infrastructure development and small-scale construction activities within Cupertino. As described under Response 10c., CAP Update projects would not impede or redirect flood flows, and as discussed under Response 9a. and 9b. in Section 9, Hazards and Hazardous Materials, CAP Update projects would generally not involve the regular use or storage of hazardous materials with the exception of battery energy storage that include the storage of lithium-ion batteries. Future CAP Update projects, such as battery energy storage facilities, would be reviewed for compliance with the applicable local and State regulations related to flooding and hazardous materials use and storage, including CMC Chapter 9.12, Hazardous Materials Storage, and CBC standards for construction within flood-prone areas.105 Furthermore, any projects associated with implementation of the CAP Update located in flood-prone areas must comply with CMC Chapter 16.52, Prevention of Flood Damage, which provides requirements to mitigate potential flood risks.106 Therefore, the CAP Update and GHG Emissions Thresholds would result in a less-than-significant impact related to flooding and inundation resulting in release of pollutants.
e. Would the project conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to obstruction of a water quality control plan.

The CAP Update would not include activities that would result in the direct extraction of groundwater. Rather, the CAP Update encourages water savings through Measure WW-1. The CAP Update would not interfere with or obstruct implementation of water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality.

Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to consistency with a water quality control plan or sustainable groundwater management plan. 104 Cupertino, City of. 2014. General Plan EIR. Available: <http://64.165.34.13/weblink/0/doc/391441/Electronic.aspx>. Accessed February 7, 2022.
105 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 9.12. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 106 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 16.52. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 624
CC 08-16-2022
624 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 86 Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.107 As a guidance document, the GHG Emissions Thresholds would not result in any development or land use changes that could result in cumulative impacts related to hydrology. Implementation of the CAP Update and GHG Emissions Thresholds would not contribute to an increase in development but could result in infrastructure development projects and minor construction activities. As such, implementation of the CAP Update and other cumulative projects could have incremental impacts related to hydrology and water quality, such as erosion and sedimentation due to construction activities. However, the CAP Update’s contribution to such impacts would be minor and temporary, and the CAP Update would have the long-term effect of reducing water use. Furthermore, CAP Update-related projects, in combination with other cumulative projects anticipated under Cupertino General Plan buildout, are not anticipated to contribute to cumulative hydrology and water quality impacts with adherence to applicable Cupertino General Plan and CMC policies as well as applicable local, State, and federal regulatory requirements. Therefore, implementation of the CAP Update would result in an overall less-than-significant cumulative impact related to hydrology and water quality. 107 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 625
CC 08-16-2022
625 of 1555
Environmental Checklist
Hydrology and Water Quality
Final Initial Study–Negative Declaration 87
This page intentionally left blank.
626
CC 08-16-2022
626 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 88 11 Land Use and Planning
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Would the project:
a. Physically divide an established
community? □ □ □ ■
b. Cause a significant environmental impact
due to a conflict with any land use plan,
policy, or regulation adopted for the
purpose of avoiding or mitigating an
environmental effect? □ □ □ ■
a. Would the project physically divide an established community? The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to division of an established community.

Likewise, the CAP Update is a policy document containing strategies that are consistent with the Cupertino General Plan and does not include actions or specific development projects that would divide an established community. CAP Update Measures TR-1 and TR-2 facilitate the provisioning of new bike and pedestrian infrastructure and amenities, improved public transit connectivity, and enhanced safety and active transportation throughout the community. Such actions would help to increase connectivity within the Cupertino community. Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to division of an established community. b. Would the project cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning and, thus, would not result in a construction or operational conflict with land use plans and policies. Rather, the GHG Emissions Thresholds would establish GHG emissions targets and analysis methodologies consistent with the goals established by the CAP Update that are enforced during CEQA review with the intention of reducing GHG emissions associated with construction and operation of future projects and plans in the City. Likewise, the CAP Update is a policy document containing programs that are consistent with the City’s General Plan, including General Plan Goal ES-1 and Strategy ES-1.1.1, that direct the City to adopt and maintain a CAP that allows for CEQA streamlining.108 Nonetheless, implementing the CAP Update would require some modification of existing policies, including developing and implementing new programs, and projects, or modifying existing ones.
108 Cupertino, City of. 2014. General Plan Environmental Resources and Sustainability Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 627
CC 08-16-2022
627 of 1555
Environmental Checklist
Land Use and Planning
Final Initial Study–Negative Declaration 89
For example, CAP Update Measure BE-2, BE-3, and BE-4 include adoption of new building ordinances or updates to the existing municipal code to require building electrification for new and existing developments. CAP Update Measure TR-1 and TR-3 may involve updates to the municipal code to require bicycle parking and EV charging infrastructure in new and existing developments.

CAP Update Measure TR-5 would include adoption of an ordinance to phase out the use of gasolinepowered off-road equipment. In addition, CAP Measure W-1 would involve the adoption of new plans and policies related to the reduction of single-use plastics, construction and demolition debris, and organic food waste to reduce the amount of waste going to the landfill, while CAP Update Action CS-2.4 includes adoption of an embodied carbon emissions ordinance that encourages or requires carbon to be sequestered in building materials. Lastly, CAP Measure WW-1 would include an ordinance to reduce water use by requiring water efficient fixtures, plumbing, and landscaping irrigation for residential land uses. In order to implement these measures, the CMC, Cupertino General Plan, and other applicable City documents may need to be amended to reflect new or modified requirements. However, where modifications of existing policies are needed, such as updates to policies related to energy, solid waste, EV infrastructure, and active transportation, the CAP Update measures and actions would result in greater avoidance or reduction of environmental effects. Furthermore, future updates to existing policies or via new proposed policies would require a separate public review process and environmental review in accordance with applicable local and State regulations. Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to consistency with current land use plans or policies.

Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.109 The CAP Update and GHG Emissions Thresholds are policy documents containing programs that are consistent with the City’s General Plan goals to increase sustainability and reduce Cupertino’s contribution to climate change impacts. Nonetheless, implementing the CAP Update and GHG Emissions Thresholds would require some modification of existing policies, including developing and implementing new programs, and projects, or modifying existing ones. The proposed policy changes are consistent with the intent of the goals and policies established within the City General Plan and would not cumulatively contribute to any environmental impacts. Cumulative projects, including the CAP Update, would be required to adhere to City development regulations and Cupertino General Plan policies to retain land use character and minimize environmental impacts. Future CAP Updaterelated projects and actions would be reviewed for consistency with the Cupertino General Plan, CMC, and other applicable regulatory land use actions prior to approval and would have the overall effect of greater avoidance or reduction of environmental effects. Therefore, implementation of the CAP Update and GHG Emissions Thresholds would result in no cumulative impact related to land use.
109 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 628
CC 08-16-2022
628 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 90 12 Mineral Resources
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Would the project:
a. Result in the loss of availability of a known
mineral resource that would be of value to
the region and the residents of the state? □ □ □ ■
b. Result in the loss of availability of a locally
important mineral resource recovery site
delineated on a local general plan, specific
plan, or other land use plan? □ □ □ ■
a. Would the project result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
b. Would the project result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan? The Cupertino General Plan Environmental Resources and Sustainability Element does not identify any mineral resources or active mineral resources recovery sites within Cupertino city limits. A small portion of Cupertino in the southwest of Cupertino was in use as a quarry in the past, but this operation ceased in the 1970s and minerals in that area have been depleted. 110 Furthermore, the CAP Update and GHG Emissions Thresholds would not facilitate development projects within the City that could result in the loss of availability of known mineral resources. Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to mineral resource.

Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.111 The Cupertino General Plan does not identify mineral resources or active mineral resource extraction operations within Cupertino. As such, CAP Update projects and the GHG Emissions Thresholds, in combination with other cumulative projects anticipated under Cupertino General Plan buildout, are not anticipated to contribute to cumulative impacts to mineral resources. Thus, implementation of the CAP Update and GHG Emissions Thresholds would result in no cumulative impact related to mineral resources.
110 Cupertino, City of. 2014. General Plan Environmental Resources and Sustainability Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 111 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 629
CC 08-16-2022
629 of 1555
Environmental Checklist
Mineral Resources
Final Initial Study–Negative Declaration 91
This page intentionally left blank.
630
CC 08-16-2022
630 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 92 13 Noise
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Would the project result in:
a. Generation of a substantial temporary or
permanent increase in ambient noise levels
in the vicinity of the project in excess of
standards established in the local general
plan or noise ordinance, or applicable
standards of other agencies? □ □ ■ □
b. Generation of excessive groundborne
vibration or groundborne noise levels? □ □ ■ □
c. For a project located within the vicinity of a
private airstrip or an airport land use plan
or, where such a plan has not been
adopted, within two miles of a public
airport or public use airport, would the
project expose people residing or working
in the project area to excessive noise
levels? □ □ □ ■
a. Would the project result in exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
Noise is unwanted sound that disturbs human activity. Environmental noise levels typically fluctuate over time, and different types of noise descriptors are used to account for this variability. Noise level measurements include intensity, frequency, and duration, as well as time of occurrence. Noise level (or volume) is generally measured in decibels (dB) using the A-weighted sound pressure level (dBA). Because of the way the human ear works, a sound must be about 10 dBA greater than the reference sound to be judged as twice as loud. In general, a 3 dBA change in community noise levels is noticeable, while 1-2 dBA changes generally are not perceived. Quiet suburban areas typically have noise levels in the range of 40-50 dBA, while arterial streets are in the 50-60+ dBA range.

Normal conversational levels are in the 60-65 dBA range, and ambient noise levels greater than 65 dBA can interrupt conversations.

Noise levels typically attenuate (or drop off) at a rate of 6 dBA per doubling of distance from point sources (such as construction equipment). Noise from lightly traveled roads typically attenuates at a rate of about 4.5 dBA per doubling of distance. Noise from heavily traveled roads typically attenuates at about 3 dBA per doubling of distance, while noise from a point source typically attenuates at about 6 dBA per doubling of distance. Noise levels may also be reduced by the introduction of intervening structures. For example, a single row of buildings between the receptor 631
CC 08-16-2022
631 of 1555
Environmental Checklist
Noise
Final Initial Study–Negative Declaration 93
and the noise source reduces the noise level by about 5 dBA, while a solid wall or berm that breaks the line-of-sight reduces noise levels by 5 to 10 dBA.

The Cupertino General Plan Health and Safety Element identifies roadway traffic as the major source of noise within Cupertino. In addition, railroads, mechanical equipment, and aircraft overhead also contribute to the noise environment of Cupertino. The Cupertino General Plan Health and Safety Element and CMC Chapter 10.48, Community Noise Control, aim to ensure appropriate noise levels considered compatible for community noise environments.112, 113 The City’s normally acceptable exterior noise exposure standards (CNEL) are shown below in Table 5.

Table 5 Land Use Compatibility for Community Noise Exposure Normally
Acceptable
Conditionally
Acceptable
Normally
Unacceptable Unacceptable
Residential- Low Density 60 dB or less 55-70 dB 71-75 dB Over 75 dB Residential- Multi-family 65 dB or less 60-70 dB 71-75 dB Over 75 dB Motels and Hotels 65 dB or less 60-70 dB 71-80 dB Over 80 dB Schools, Libraries, Hospitals,
Nursing Homes, Churches
70 dB or less 60-70 dB 71-80 dB Over 80 dB
Auditoriums, Concert Halls,
Amphitheaters
n/a 70 dB or less n/a Over 70 dB
Sports Arena, Outdoor Spectator
Sports
n/a 75 dB or less n/a Over 75 dB
Playgrounds and Neighborhood
Parks
70 dB or less n/a 67-75 dB Over 75 dB
Golf Courses, Riding Stables, Water
Recreation, Cemeteries
75 dB or less n/a 70-80 dB Over 80 dB
Office Buildings, Commercial and
Professional Centers
60 dB or less 67-77 dB Over 75 dB n/a
Industrial, Manufacturing, Utilities,
Agriculture
75 dB or less 70-80 dB Over 75 dB n/a
Source: City of Cupertino General Plan Health and Safety Element, Figure HS-8 Construction noise is regulated by CMC Section 10.48.053, Grading, Construction and Demolition, which provides an exemption to the noise regulations for construction occurring between the hours of 7:00 am and 8:00 pm on weekdays and 9:00 am to 6:00 pm on weekends. Construction noise is permitted during the above specified house provided that one of the following conditions is met:
 No individual device produces a noise level more than eighty-seven dBA at a distance of twentyfive feet (7.5 meters); or  The noise level at any nearby property does not exceed 80 dB. 112 Cupertino, City of. 2014. General Plan Health and Safety Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 113 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 10.48. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 632
CC 08-16-2022
632 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 94 In addition, construction is not permitted within 750 feet of a residential area on Saturdays, Sundays, and holidays unless it is an emergency.114
The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to excessive noise levels. The CAP Update is a policy document containing programs that are consistent with the General Plan. Some of the CAP Update actions would support small scale construction projects that could result in temporary noise.

CAP Update Actions BE-2.4, BE-2.6, BE-2.7, BE-2.9 through BE-2.11, BE-3.1, BE-3.5, BE-3.6, and BE3.8 that promote electrification of existing residential and commercial buildings, which may require minor construction to modify the electrical and natural gas connections to existing buildings. CAP Update Actions TR-1.1 through TR-1.5 would encourage development of new bicycle infrastructure, which may involve construction activities to create new bike lanes and bike/pedestrian paths throughout Cupertino. CAP Update Actions TR-3.2, TR-3.4, and TR-3.12 would incentivize or require the installation of new EV charging stations. In addition, CAP Update Action CS-1.3 seeks to plant additional trees throughout Cupertino, which may require the use of construction equipment for the moving and placement of trees. However, CAP Update projects and actions would be reviewed for consistency with the Cupertino General Plan and CMC, and construction activities would be required to comply with the provisions of the CMC Chapter 10.48, Community Noise Control, including the permitted construction hours and maximum noise limits.115 Therefore, the CAP Update would not result in significant construction noise related impacts.

The CAP Update does not include future projects that would result in substantial operational noise.

Rather, the CAP Update encompasses a suite of GHG-reduction opportunities that affect the transportation sector and its associated noise. For example, CAP Update Strategies TR-1 through TR-5 encourage adoption of EVs and electric small engine and off-road equipment, which are quieter than gas-powered alternatives, disincentivize the use of gasoline-powered vehicles, and facilitate improvements to bicycle and public transit circulation to increase active transportation and transit ridership and decrease VMT. These strategies would reduce traffic-related noise in Cupertino, which is the major source of noise pollution identified in the General Plan Health and Safety Element.116 In addition, CAP Update Action TR-5.3 would seek to increase the use of electric landscaping aligning with the provisions of CMC Section 10.48.051, Landscape Maintenance Activities, that seeks to reduce noise related to landscaping equipment use. Therefore, the CAP Update and GHG Emissions Thresholds would not generate excessive noise levels; thus, there would be a less-than-significant impact related to noise exposure. b. Would the project result in exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels?
While people have varying sensitivities to vibrations at different frequencies, in general they are most sensitive to low-frequency vibration. Vibration in buildings, such as from nearby construction activities, may cause windows, items on shelves, and pictures on walls to rattle. Vibration of building components can also take the form of an audible low-frequency rumbling noise, referred to as 114 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 10.48. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 115 Ibid.
116 Cupertino, City of. 2014. General Plan Health and Safety Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 633
CC 08-16-2022
633 of 1555
Environmental Checklist
Noise
Final Initial Study–Negative Declaration 95
groundborne noise.117 Although groundborne vibration is sometimes noticeable in outdoor environments, it is almost never annoying to people who are outdoors. The primary concern from vibration is that it can be intrusive and annoying to building occupants and vibration-sensitive land uses.

Vibration amplitudes are usually expressed in peak particle velocity (PPV) or Root Mean Square (RMS) vibration velocity. The PPV and RMS velocity are normally described in inches per second (in/sec). PPV is defined as the maximum instantaneous positive or negative peak of a vibration signal. PPV is often used in monitoring of blasting vibration because it is related to the stresses that are experienced by buildings.118 Vibration significance ranges from approximately 50 vibration decibels (VdB), which is the typical background vibration-velocity level, to 100 VdB, the general threshold where minor damage can occur in fragile buildings. The general human response to different levels of groundborne vibration velocity levels is described in Table 6.

Table 6 Human Response to Different Levels of Groundborne Vibration119 Vibration Velocity Level Human Reaction
65 VdB Approximate threshold of perception for many people 75 VdB Approximate dividing line between barely perceptible and distinctly perceptible. Many people find that transportation-related vibration at this level is unacceptable. 85 VdB Vibration acceptable only if there are an infrequent number of events per day VdB = vibration decibels
Source: Federal Transit Administration Transit Noise and Vibration Impact Assessment Manual The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to groundborne vibration. The CAP Update is a policy document containing programs that are consistent with the Cupertino General Plan. Some of the proposed CAP Update measures and actions would support small-scale construction projects, such as EV charging station construction and new bicycle lanes, that may result in a temporary, minor increase in groundborne vibration during construction. However, CAP Update projects would be subject to review by the City for compliance and consistency with the Cupertino General Plan and CMC and construction activities would be required to comply with applicable local, State, and federal regulations to ensure that temporary construction impacts related to groundborne vibration would not occur. Furthermore, CAP Update projects would not include operational sources of groundborne vibration. Thus, the CAP Update and GHG Emissions Thresholds would result in a lessthan-significant impact related to groundbourne vibration. 117 Caltrans. 2020. Transportation and Construction Vibration Guidance Manual (CT-HWANP-RT-13-069.25.3). Available:
<https://dot.ca.gov/-/media/dot-media/programs/environmental-analysis/documents/env/tcvgm-apr2020-a11y.pdf>. Accessed February 24, 2022.
118 Federal Highway Administration (FHWA). 2006. FHWA Highway Construction Noise Handbook. (FHWAHEP-06-015; DOT-VNTSCFHWA-06-02). Available: <https://www.fhwa.dot.gov/Environment/noise/construction_noise/handbook/handbook00.cfm>. Accessed February 24, 2022.
119 Federal Transit Administration. 2018. Transit Noise and Vibration Impact Assessment Manual. <https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/research-innovation/118131/transit-noise-and-vibration-impact-assessmentmanual-fta-report-no-0123_0.pdf>. Accessed February 24, 2022. 634
CC 08-16-2022
634 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 96 c. For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? Cupertino does not contain any airports and is not within the airport land use plan or noise contours for the nearest airport, the San Jose International Airport.120 Furthermore, the GHG Emissions Thresholds and CAP Update are policy documents that would not increase airport activity or result in additional habitable development or commercial development that could increase potential exposure of residents and employees to aircraft-related noise. Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to aviation-related noise exposure.

Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.121 The CAP Update and GHG Emissions Thresholds are policy documents containing programs that are consistent with the Cupertino General Plan Health and Safety Element. As a guidance document, the GHG Emissions Thresholds would not result in any development or land use changes that could result in cumulative impacts related to noise. However, future CAP Update-related projects, in combination with other cumulative projects anticipated under Cupertino General Plan buildout, would support construction projects, such as EV charging station construction, that may result in a temporary increase in groundborne vibration or noise levels. However, cumulative projects, including CAP Update projects, would be subject to review by the City for compliance with the Cupertino General Plan and CMC and would be required to comply with applicable local, State, and federal regulations governing construction noise and vibration. Additionally, the CAP Update encompasses a suite of GHG-reduction opportunities that would decrease VMT and traffic-related noise. As such, implementation of the CAP Update would not generate permanent, excessive groundborne vibration or noise levels. Therefore, the CAP Update and GHG Emissions Thresholds would result in an overall less-than-significant cumulative impact related to noise. 120 Cupertino, City of. 2014. General Plan Health and Safety Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 121 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 635
CC 08-16-2022
635 of 1555
Environmental Checklist
Noise
Final Initial Study–Negative Declaration 97
This page intentionally left blank.
636
CC 08-16-2022
636 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 98 14 Population and Housing
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Would the project:
a. Induce substantial unplanned population
growth in an area, either directly (for
example, by proposing new homes and
businesses) or indirectly (for example,
through extension of roads or other
infrastructure)? □ □ □ ■
b. Displace substantial numbers of existing
people or housing, necessitating the
construction of replacement housing
elsewhere? □ □ □ ■
a. Would the project induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
b. Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to substantial unplanned population growth or the displacement of existing people or housing. Likewise, the CAP Update is a policy document containing measures and actions to increase sustainability and does not include any programs that would result in new housing or jobs or alterations to existing housing. In addition, the CAP Update does not propose new infrastructure, such as roadways or utilities, that could indirectly lead to new population growth or development. Therefore, the CAP Update would not directly increase the population, indirectly induce additional unplanned population growth, or displace people or housing. Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to population and housing.

Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.122 As a guidance document, the GHG Emissions Thresholds would not result in any development or land use changes that could result in cumulative impacts related to population and housing. Similarly, CAP Update projects, in combination with other cumulative projects anticipated under Cupertino General Plan 122 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 637
CC 08-16-2022
637 of 1555
Environmental Checklist
Population and Housing
Final Initial Study–Negative Declaration 99
buildout, are not anticipated to displace people or housing nor induce substantial unplanned population growth within Cupertino. Specifically, the CAP Update would not contribute to person or housing displacement in Cupertino nor result in population growth beyond that already assumed and planned for in the Cupertino General Plan and in accordance with Cupertino 2040 population projections. Therefore, the CAP Update and GHG Emissions Thresholds would result in no cumulative impact related to population and housing.
638
CC 08-16-2022
638 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 100
15 Public Services
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
a. Would the project result in substantial
adverse physical impacts associated with
the provision of new or physically altered
governmental facilities, or the need for
new or physically altered governmental
facilities, the construction of which could
cause significant environmental impacts, in
order to maintain acceptable service ratios,
response times or other performance
objectives for any of the public services:

1. Fire protection? □ □ □ ■

2. Police protection? □ □ □ ■

3. Schools? □ □ □ ■

4. Parks? □ □ □ ■

5. Other public facilities? □ □ □ ■
a. Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, or the need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
 Fire protection?
 Police protection?
 Schools?
 Parks?
 Other public facilities?
The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to public services. The CAP Update is a policy document containing programs that are consistent with the Cupertino General Plan.

Implementation of the CAP Update and its proposed measures and actions would not result in increases in population or new employment opportunities that could induce population growth, as further discussed in Section 14, Population and Housing. As such, the CAP Update would not require the construction of new or physically altered governmental facilities to serve additional population, the construction of which could cause significant environmental impacts. CAP Update Strategy 639
CC 08-16-2022
639 of 1555
Environmental Checklist
Public Services
Final Initial Study–Negative Declaration 101
CRW-1 and Actions S8 and S9 would help to increase community resiliency and reduce vulnerability to the impacts of climate change and mitigate hazards such as flooding and wildfire within Pleasanton, thereby reducing the burden on local public services related to such natural disasters.

Furthermore, future CAP 2.0 projects and actions would be reviewed for consistency with the Pleasanton General Plan and other applicable local and State regulations related to public services.

Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to public services in terms of need for the construction of new or altered governmental facilities.

Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.123 As a guidance document, the GHG Emissions Thresholds would not result in cumulative impacts related to public services and facilities. Likewise, implementation of CAP Update projects, in combination with other cumulative projects anticipated under Cupertino General Plan buildout, would not result in increases in population or induce additional population growth beyond that assumed under the Cupertino General Plan and in accordance with Cupertino 2040 population projections. Therefore, implementation of the CAP Update would not result in substantial cumulative need to expand public services facilities. Thus, CAP Update and GHG Emissions Thresholds would result in an overall lessthan-significant cumulative impact related to public services. 123 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 640
CC 08-16-2022
640 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 102
16 Recreation
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Would the project:
a. Increase the use of existing neighborhood
and regional parks or other recreational
facilities such that substantial physical
deterioration of the facility would occur or
be accelerated? □ □ □ ■
b. Include recreational facilities or require the
construction or expansion of recreational
facilities which might have an adverse
physical effect on the environment? □ □ □ ■
a. Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?
b. Would the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? Cupertino is a primarily urbanized community with parks and recreational spaces incorporated throughout Cupertino. There are a total of 165 acres of City-owned public parks in Cupertino, and 220 acres of regional parks and trails are available in the vicinity of Cupertino. The Cupertino General Plan Recreation, Parks, and Community Services Element identifies goals, policies, and programs to manage the local parks and recreational facilities and protect open space resources within Cupertino.124 The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to parks or recreational facilities. The CAP Update is a policy document containing programs that are consistent with Cupertino’s General Plan, including the recreation and open space policies established in the Recreation, Parks, and Community Services Element. As described in Section 14, Population and Housing, the CAP Update would not result in substantial population growth or direct land use changes. As such, implementation of the CAP Update would not result in a substantial physical deterioration of parks or other recreational facilities or result in the need to expand recreational facilities. Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to the need for construction of new or altered recreational facilities. 124 Cupertino, City of. 2014. General Plan Recreation, Parks, and Community Services Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 641
CC 08-16-2022
641 of 1555
Environmental Checklist
Recreation
Final Initial Study–Negative Declaration 103
Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.125 As a guidance document, the GHG Emissions Thresholds would not result in cumulative impacts related to parks and recreational facilities. Likewise, implementation of CAP Update projects, in combination with other cumulative projects anticipated under Cupertino General Plan buildout, would not result in increases in population or induce additional population growth beyond that assumed under the Cupertino General Plan and in accordance with Cupertino 2040 population projections. Therefore, implementation of the CAP Update would not result in substantial cumulative deterioration of recreational facilities or the need to construct new recreational facilities. Therefore, implementation of the CAP Update and GHG Emissions Thresholds would result in no cumulative impact related to recreation.
125 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 642
CC 08-16-2022
642 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 104
17 Transportation
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Would the project:
a. Conflict with a program, plan, ordinance or
policy addressing the circulation system,
including transit, roadway, bicycle and
pedestrian facilities? □ □ □ ■
b. Conflict or be inconsistent with CEQA
Guidelines section 15064.3, subdivision
(b)? □ □ □ ■
c. Substantially increase hazards due to a
geometric design feature (e.g., sharp
curves or dangerous intersections) or
incompatible use (e.g., farm equipment)? □ □ ■ □
d. Result in inadequate emergency access? □ □ ■ □
a. Would the project conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities? b. Would the project conflict or be inconsistent with CEQA Guidelines section 15064.3, subdivision (b)?
The Cupertino General Plan Mobility Element includes the following goals:
 Goal M-1: Actively participate in regional planning processes to coordinate local planning and to advocate for decisions that meet and complement the needs of Cupertino.  Goal M-2: Promote improvements to city streets that safely accommodate all transportation modes and persons of all abilities.
 Goal M-3: Support a safe pedestrian and bicycle street network for people of all ages and abilities.
 Goal M-4: Promote local and regional transit that is efficient, frequent, and convenient and reduce traffic impacts.
 Goal M-5: Ensure safe and efficient pedestrian and bicycle access to schools while working to reduce school-related congestion.
 Goal M-6: Promote innovative strategies to provide efficient and adequate vehicle parking.  Goal M-7: Review and update TIA policies and guidelines that allow for adequate consideration for all modes of transportation including automobiles, walking, bicycles and transit.
 Goal M-8: Promote policies to help achieve state, regional and local air quality and greenhouse gas emission reduction targets.
643
CC 08-16-2022
643 of 1555
Environmental Checklist
Transportation
Final Initial Study–Negative Declaration 105
 Goal M-9: Promote effective and efficient use of the city's transportation network and services.
 Goal M-10: Ensure that the City's transportation infrastructure is well-maintained for all modes of transportation and that projects are prioritized on their ability to meet the City's mobilities goals.126
Additionally, the City adopted a Bicycle Transportation Plan in 2016 and Pedestrian Transportation Plan in 2018 to make active transportation within Cupertino a safe and pleasant option by providing a dedicated bicycle and pedestrian network. The Bicycle and Pedestrian Transportation Plans also implement the Cupertino General Plan goals, policies, and programs related to complete streets by building a blueprint for a system of bikeways and pedestrian facilities across Cupertino.127, 128 The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to conflict with a program, plan, ordinance, or policy addressing the transportation circulation system. The CAP Update is a policy document containing strategies and policies that are consistent with the Cupertino General Plan Mobility Element and Bicycle and Pedestrian Plans. CAP Update Measure TR-1 facilitates the continued implementation of the Bicycle and Pedestrian Transportation plans and the development of new bicycle and pedestrian facilities, including bike and pedestrian paths, secure bike parking, and bike share and micro-mobility stations, in order to achieve a 15 percent bike mode share by 2030.

Similarly, CAP Update Measure TR-2 would implement improvements to the public transit system and services, such as an expansion of the Via-Cupertino Shuttle service and free public transit pilot programs, to achieve a 29 percent mode share for public transit by 2030. Additionally, CAP Update Measures TR-3 and TR-4 incentivize and facilitate EV adoption and a reduction in the use of gasoline-powered vehicles, aligning with General Plan Goal M-8 to promote policies that help achieve regional and State air quality and GHG emissions goals.

The CAP Update measures would advance active transportation and public transit within Cupertino and decrease VMT and associated air pollutants and GHG emissions. The CAP Update measures would be consistent with the Cupertino General Plan Mobility Element and Bicycle and Pedestrian Transportation Plans goals related to improving multi-modal facilities, reducing VMT and singleoccupancy vehicles, encouraging active transportation, and reducing vehicle congestion within Cupertino. Furthermore, the CAP Update would seek to reduce VMT within Cupertino, consistent with CEQA Guidelines section 15064.3, subdivision (b). Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to consistency with plans addressing the transportation circulation system.
126 Cupertino, City of. 2014. General Plan Mobility Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 127 Cupertino, City of. 2016. Bicycle Transportation Plan. Available:
<https://www.cupertino.org/home/showpublisheddocument/3479/636443578340030000>. Accessed February 24, 2022. 128 Cupertino, City of. 2018. Pedestrian Transportation Plan. Available:
<https://www.cupertino.org/home/showpublisheddocument/16864/636650034974470000>. Accessed February 24, 2022. 644
CC 08-16-2022
644 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 106
c. Would the project substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible use (e.g., farm equipment)? d. Would the project result in inadequate emergency access? The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to risk associated with transportation design, incompatible use, or emergency access. The CAP Update is a policy document containing strategies that are consistent with the Cupertino General Plan, including the Mobility Element, and would not facilitate development beyond that allowed under the Cupertino General Plan. Implementation of some CAP Update actions, such as Actions TR-1.1 through TR-1.5 that would provide for new bicycle and pedestrian facilities and complete streets, may involve construction within the local right-ofway. Construction activities have the potential to require lane closures and may impact traffic and vehicle speeds on the affected roadways; however, these impacts would be temporary and access to roadways would generally be maintained throughout project construction. Furthermore, future projects involving work in the public right-of-way would be required to coordinate with the City to ensure appropriate construction staging and adequate emergency access on adjacent roadways pursuant to CMC Chapter 14.08, Encroachments and Use of City Rights-of-Way.129 Compliance with the CMC would ensure that significant impacts to the circulation system design, including safety impacts and emergency access, would not occur. As such, construction of CAP Update projects would not create transportation design hazards or result in inadequate emergency access.

Furthermore, the CAP Update would facilitate increased active transportation and public transit use and decreased VMT within Cupertino, which in turn would reduce potential transportation hazards and congestion conditions that can hinder emergency response. Thus, the CAP Update and GHG Emissions Thresholds would result in a less-than-significant impact related to transportation hazards and emergency access.

Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.130The goals, policies, objectives, measures, and actions included in the Cupertino General Plan Mobility Element and Bicycle and Pedestrian Transportation Plans promote a safe and efficient transportation network that serves all modes and the reduction of VMT and associated air pollutants and GHG. The GHG Emissions Thresholds would not conflict with these goals or result physical projects and associated cumulative impacts related to transportation. Likewise, the CAP Update measures and actions would not conflict with the objectives and policies of the General Plan or Bicycle and Pedestrian Transportation Plans but would rather be consistent with and promote those plans. Therefore, the CAP Update and GHG Emissions Thresholds would result in an overall less-than-significant cumulative impact related to transportation.
129 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 14.08. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 22, 2022. 130 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 645
CC 08-16-2022
645 of 1555
Environmental Checklist
Transportation
Final Initial Study–Negative Declaration 107
This page intentionally left blank.
646
CC 08-16-2022
646 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 108
18 Tribal Cultural Resources
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
a. Listed or eligible for listing in the California
Register of Historical Resources, or in a
local register of historical resources as
defined in Public Resources Code section
5020.1(k), or □ □ ■ □
b. A resource determined by the lead agency,
in its discretion and supported by
substantial evidence, to be significant
pursuant to criteria set forth in subdivision
(c) of Public Resources Code Section
2024.1. In applying the criteria set forth in
subdivision (c) of Public Resources Code
Section 5024.1, the lead agency shall
consider the significant of the resource to a
California Native American tribe? □ □ ■ □
a. Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in a Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe and that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code § 5020.1 (k)? b. Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in a Public Resources Code section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe and that is a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 2024.1. In applying the criteria set forth in subdivision (c) of Public Resources Code Section 5024.1, the lead agency shall consider the significant of the resource to a California Native American tribe?
On April 22, 2022, the eight following Native American Heritage Commission (NAHC)-identified local Native American tribal groups were formally notified that the City initiated environmental review of the CAP Update and GHG Emissions Thresholds and were invited to provide consultation:
647
CC 08-16-2022
647 of 1555
Environmental Checklist
Tribal Cultural Resources
Final Initial Study–Negative Declaration 109
 Amah Mutsun Tribal Band
 Amah Mutsun Tribal Band of Mission San Juan Bautista
 Muwekma Ohlone Indian Tribe of the San Francisco Bay Area  North Valley Yokuts Tribe
 Tamien Nation
 Indian Canyon Mutsun Band of Costanoan
 The Ohlone Indian Tribe
 Wuksache Indian Tribe/Eshom Valley Band
Under AB 52, Native American tribes have 30 days to respond and request further project information and formal consultation. Responses were received via email on April 24 and May 25, 2022 from the Muwekma Ohlone Indian Tribe of the San Francisco Bay Area and Indian Canyon Mutsun Band of Costanoan, respectively. In email responses sent to the tribes on June 2, 2022, the City indicated that it would keep the tribes informed of any future CEQA-related projects and proceedings associated with the CAP Update and any tribal cultural resources or human remains discovered during ground disturbing activities. The City of Cupertino will continue to comply with the requirements of AB 52, and any consultation that takes place subsequent to the publication of the Draft IS-ND will be incorporated into the results of the Final IS-ND.

The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to tribal cultural resources. Likewise, the CAP Update would not involve land use or zoning changes that would increase development within Cupertino but would instead promote sustainable infrastructure development within the urbanized area of Cupertino. As a policy document, the CAP Update would also not directly entail ground disturbing activities. However, future implementation of CAP Update actions related to existing building energy, EV charging infrastructure, active transportation, water conservation, and tree planting may include construction activities with the potential to disturb previously undiscovered tribal cultural resources, as discussed further below.

Electrification retrofits associated with CAP Update Actions BE-2.4, BE-2.6, BE-2.7, BE-2.9 through BE-2.11, BE-3.1, BE-3.5, BE-3.6, and BE-3.8 may change the physical environment through the need for upgraded service and electrical panels, branch circuit upgrades, installation of condensate drains to facilitate the installation of electric heat pumps for water and space heating, and ground disturbance to remove nature gas infrastructure. The physical changes these upgrades would entail are dependent on the year of building construction and location of electrical and service panels and plumbing connection of condensate drains, which sometimes may include modifications to the interior and/or exterior of buildings for wiring and panel replacement and minor excavation for connection of drainage to sewer systems.

CAP Update Actions TR-1.1 through TR-1.5 would encourage development of new bicycle infrastructure, which may involve construction activities to create new bike lanes and bike/pedestrian paths throughout Cupertino. CAP Update Actions TR-3.2, TR-3.4, and TR-3.12 would incentivize or require the installation of new EV charging stations. Installation of EV chargers and new bike and pedestrian facilities would primarily impact previously disturbed areas within existing parking lots and public rights-of-way. However, the physical changes these installations and enhancements would entail are dependent on the location of construction for the EV charging 648
CC 08-16-2022
648 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 110
connections and active transportation infrastructure, which in some cases may include minor temporary excavation and grading.

CAP Update Action CS-1.3 seeks to plant additional trees throughout Cupertino, which may require the use of construction equipment for the moving and placement of trees. These actions could result in ground disturbance related to the construction of new infrastructure and planting new trees.

Implementation of these CAP Update actions could impact unknown tribal cultural resources during construction that involves below-grade activities in previously undisturbed soils. However, future CAP Update projects would be located and designed strategically to reduce ground disturbance to the maximum extent possible. In addition, CAP Update projects and actions would be reviewed for consistency with applicable local, regional, and State tribal cultural and archaeological regulations prior to final siting and construction and would be required to implement BMPs in accordance with CMC Chapter 17.04, Standard Environmental Protection Requirements. CMC Chapter 17.04 includes a requirement that projects within areas of known cultural resources as documented in the 2015 General Plan EIR and the archaeological or tribal cultural resources cannot be avoided, the project must complete a subsurface evaluation for cultural resources in consultation with a tribal representative. In addition, CMC Chapter 17.04 includes standard requirements for all projects, including worker environmental awareness training and a requirement during all ground disturbing activities that if potential tribal cultural resources are unearthed, construction must be halted, the City must be contacted, and a qualified professional must be hired to investigate and make recommendations.131 As such, tribal cultural resources would be protected prior to and/or upon discovery and, thus, impacts would be reduced to a minimal level. Therefore, the CAP Update and GHG Emissions Thresholds would result in a less-than-significant impact related to tribal cultural resources.

Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.132As a guidance document, the GHG Emissions Thresholds would not result in construction projects and would not affect tribal cultural resources. CAP Update projects, in combination with other cumulative projects anticipated under Cupertino General Plan buildout, could increase the potential for adverse effects to unknown tribal cultural resources in Cupertino. However, impacts to tribal cultural resources are site-specific; accordingly, as required under applicable laws and regulations, potential impacts associated with cumulative developments would be addressed on a case-by-case basis as cumulative project details and locations become known. CAP Update projects and other cumulative projects would be required to comply with the CMC Chapter 17.04, Standard Environmental Protection Requirements, for the protection and proper treatment of any resources discovered during ground disturbance, which would minimize the potential for significant impacts to tribal cultural resources. Therefore, the CAP Update and GHG Emissions Thresholds would result in a lessthan-significant cumulative impact related to tribal cultural resources. 131 Cupertino, City of. 2022. Cupertino Municipal Code Chapter 17.04. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>. Accessed February 16, 2022. 132 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 649
CC 08-16-2022
649 of 1555
Environmental Checklist
Tribal Cultural Resources
Final Initial Study–Negative Declaration 111
This page intentionally left blank.
650
CC 08-16-2022
650 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 112
19 Utilities and Service Systems
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Would the project:
a. Require or result in the relocation or
construction of new or expanded water,
wastewater treatment or storm water
drainage, electric power, natural gas, or
telecommunications facilities, the
construction or relocation of which could
cause significant environmental effects? □ □ ■ □
b. Have sufficient water supplies available to
serve the project and reasonably
foreseeable future development during
normal, dry and multiple dry years? □ □ □ ■
c. Result in a determination by the
wastewater treatment provider which
serves or may serve the project that it has
adequate capacity to serve the project’s
projected demand in addition to the
provider’s existing commitments? □ □ □ ■
d. Generate solid waste in excess of State or
local standards, or in excess of the capacity
of local infrastructure, or otherwise impair
the attainment of solid waste reduction
goals? □ □ □ ■
e. Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste? □ □ □ ■
a. Would the project require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?
The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not have direct construction or operational impacts related to utilities and service systems. The CAP Update is a policy document aimed at reducing water, solid waste, and energy consumption and related GHG emissions and does not include site-specific infrastructure designs or project proposals.

Furthermore, implementation of the CAP Update would not result in an increase in population and 651
CC 08-16-2022
651 of 1555
Environmental Checklist
Utilities and Service Systems
Final Initial Study–Negative Declaration 113
housing, nor would it facilitate growth beyond that anticipated by the Cupertino General Plan. As such, implementing the CAP Update would not create new demand related to water, wastewater, stormwater drainage, electric power, natural gas power, or telecommunications utilities. However, projects resulting from implementation of the CAP Update could include redevelopment and/or restructuring of electricity and natural gas power facilities and infrastructure, as well as new local renewable energy generation and storage and water infrastructure projects. Potential impacts related to these strategies are discussed further below.

Water Supply Facilities/Infrastructure
San Jose Water and California Water Service are the water suppliers serving Cupertino. The water service providers purchase their water from the Santa Clara Valley Water District, which sources its water from the Rinconada Treatment Plan and groundwater wells.133 The CAP Update and GHG Emissions Thresholds would not result in new land uses that would contribute to an increase in water use compared to existing conditions. Rather, CAP Update Measure WW-1 seeks to decrease water consumption by 15 percent compared to 2018 levels. In addition, CAP Update Action WW-1.7 may involve the operation of a new brackish water/desalinization program that would increase water supplies, if feasible. Construction and operation of any new brackish water/desalination infrastructure by the Santa Clara Valley Water District (Valley Water) would require discretionary review by Valley Water (the lead agency for that program) when project locations and details are known and, thus, would be evaluated in accordance with CEQA at the time of such review. As the CAP Update and GHG Emissions Thresholds would result in reduced water use, the relocation or construction of new or expanded water facilities would not be required and impacts would be lessthan-significant.

Wastewater Treatment Facilities/Infrastructure
Cupertino Sanitary District (CSD) and Sunnyvale Sanitary operate the sanitary sewer systems serving Cupertino. Wastewater from the CSD is conveyed and treated at the San Jose/Santa Clara Water Pollution Control Plan (SJ/SCWPCP), while wastewater generated in the Sunnyvale Sanitary district is treated by the City of Sunnyvale.134 The CAP Update and GHG Emissions Thresholds would not result in new land uses that would generate sanitary wastewater or otherwise contribute to an increase in wastewater treatment requirements. The amount or characteristics of wastewater treated at the SJ/SCWPCP or by the City of Sunnyvale would not change compared to existing conditions with implementation of the proposed plans. Therefore, the CAP Update and GHG Emissions Thresholds would not require relocation or construction of new wastewater collection or treatment infrastructure and no impact would occur.

Stormwater Drainage Facilities/Infrastructure
The City of Cupertino maintains a system of storm drains, gutters, and ditches to convey stormwater generated during rain events. As discussed in Section 10, Hydrology and Water Quality, the GHG Emissions Thresholds provide guidance during CEQA review, and do not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not have direct construction or operational impacts related to stormwater drainage facilities. implementation of CAP Update Actions related to building electrification, renewable energy 133 Cupertino, City of. 2014. General Plan Infrastructure Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 134 Ibid.
652
CC 08-16-2022
652 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 114
production and storage, transportation, water, and urban trees may promote infrastructure development that would involve small-scale construction. Construction of projects implemented in accordance with the CAP Update could result in erosion and potential changes to drainage patterns.

However, as described in Section 7, Geology and Soils, and Section 10, Hydrology and Water Quality, CAP Update projects would be required to comply with local, State, and federal requirements during construction that would control stormwater runoff, erosion, and potential impacts to the stormwater drainage system. Furthermore, CAP Update Measure CS-1 encourages the planting of additional urban trees within the community, which would help to reduce impermeable groundcover and stormwater flows to the City’s drainage facilities. Therefore, no impact related to need for construction or expansion of stormwater drainage facilities and infrastructure would occur.

Electric Power Facilities/Infrastructure
Electric power service in the City is provided by SVCE using transmission infrastructure operated and maintained by Pacific Gas & Electric (PG&E). The CAP Update and GHG Emissions Thresholds would not involve new land uses or development that require new or additional electric service. CAP Update Measure BE-1 promotes the use of SVCE-supplied energy for residential and commercial uses to increase the use of clean electricity. CAP Update Measure BE-2 through BE-4 promote electrification of new and existing buildings. CAP Update Actions BE-3.7 and BE-3.8 support installation of small-scale solar PV systems and battery storage facilities throughout Cupertino to provide greener renewable electricity within Cupertino. In addition, CAP Update Measure TR-3 encourages new EV infrastructure throughout Cupertino. These CAP Update measures and actions may slightly alter electricity demand within Cupertino. However, the CAP Update would serve as a pathway to reduce GHG emissions, including emissions related to energy consumption, and other beneficial environmental and sustainability effects. These benefits include a reduction in energy consumption. Therefore, the CAP Update and GHG Emissions Thresholds would result in a less-thansignificant impact related to construction, expansion, or relocation of electric power facilities and infrastructure.

Natural Gas Power Facilities/Infrastructure
PG&E provides natural gas services to Cupertino. The CAP Update and GHG Emissions Thresholds would not involve new land uses that require new or additional natural gas service that could require the construction of new or expanded natural gas facilities. CAP Update Measures BE-2 through BE-4 would encourage or require building electrification in new and existing buildings to reduce natural gas consumption within Cupertino. Implementation of these actions could involve alterations, such as abandonment or removal, to existing natural gas infrastructure as natural gas use is reduced. However, the CAP Update would serve as a pathway to reduce GHG emissions, including emissions related to energy consumption, and other beneficial environmental and sustainability effects. These benefits include a reduction in natural gas consumption. Therefore, the CAP Update and GHG Emissions Thresholds would result in a less-than-significant impact related to construction, removal, or relocation of natural gas power facilities and infrastructure.

Telecommunications Facilities/Infrastructure
The city is served by existing telecommunications companies such as AT&T, Verizon, and Comcast.

The CAP Update would not alter existing telecommunications facilities and infrastructure and would not involve new land uses or development that would require new telecommunications 653
CC 08-16-2022
653 of 1555
Environmental Checklist
Utilities and Service Systems
Final Initial Study–Negative Declaration 115
infrastructure. Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to need for construction or expansion of telecommunication facilities and infrastructure. b. Would the project have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years? c. Would the project result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to water supplies. Similarly, the CAP Update is a policy-level document that does not include site-specific infrastructure designs or project proposals, nor does it grant entitlements for development that would have the potential to increase demand for water supply or wastewater treatment. Rather the CAP Update contains measures and actions to reduce water use, such as Measure WW-1, that includes actions to require water efficient fixtures and landscaping irrigation, promote graywater use, and education the community on water conservation. Thus, the CAP Update and GHG Emissions Thresholds would result in no impact related to water supply and wastewater treatment.
d. Would the project generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?
e. Would the project comply with federal, State, and local management and reduction statutes and regulations related to solid waste?
Recology South Bay is responsible for collecting and disposing of solid waste generated by residential, commercial, and industrial customers in Cupertino. Waste generated in Cupertino is sent to the Newby Island Sanitary Landfill, which has a maximum daily throughput of 4,000 tons of waste per day and is permitted to operate through 2041.135,136 The GHG Emissions Thresholds is a guidance document and does not propose development or changes to land use and zoning. Thus, implementation of the GHG Emissions Thresholds would not result in construction or operational impacts related to solid waste. Likewise, the CAP Update would not facilitate increased development and, thus, would result in an increase in solid waste collection and disposal demand. Rather, the CAP Update includes measures and actions, such as Measures W1a, W-1b, and W-2, that would reduce solid waste production, increase the diversion of organic and food waste, reduce construction and demolition debris, and increase participation in recycling programs in order to minimize waste being sent to the landfill. Therefore, the CAP Update and GHG Emissions Thresholds would result in no impact related to solid waste.

Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in 135 Cupertino, City of. 2014. General Plan Infrastructure Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 136 CalRecycle. 2022. SWIS Facility/Site Activity Details: Newby Island Sanitary Landfill. Available:
<https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/1362?siteID=3388>. Accessed February 25, 2022. 654
CC 08-16-2022
654 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 116
Cupertino would result in an anticipated total population of 65,690 by 2030.137Other cumulative projects anticipated under Cupertino General Plan buildout could result in increases in population and additional use of or need for utilities and service systems. However, implementation of the GHG Emissions Thresholds and CAP Update and related infrastructure projects would not contribute to increases in population or induce additional population growth that would require additional use of existing utilities or service systems. Rather, implementation of the CAP Update would result in reduced energy and water consumption and solid waste and wastewater production. Thus, implementation of the CAP Update GHG Emissions Thresholds would result in an overall less-thansignificant cumulative impact related to utilities and service systems. 137 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 655
CC 08-16-2022
655 of 1555
Environmental Checklist
Utilities and Service Systems
Final Initial Study–Negative Declaration 117
This page intentionally left blank.
656
CC 08-16-2022
656 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 118
20 Wildfire
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact No Impact
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project:
a. Substantially impair an adopted
emergency response plan or emergency
evacuation plan? □ □ □ ■
b. Due to slope, prevailing winds, and other
factors, exacerbate wildfire risks and
thereby expose project occupants to
pollutant concentrations from a wildfire
or the uncontrolled spread of a wildfire? □ □ □ ■
c. Require the installation or maintenance
of associated infrastructure (such as
roads, fuel breaks, emergency water
sources, power lines or other utilities)
that may exacerbate fire risk or that may
result in temporary or ongoing impacts
to the environment? □ □ □ ■
d. Expose people or structures to significant
risks, including downslopes or
downstream flooding or landslides, as a
result of runoff, post-fire slope instability,
or drainage changes? □ □ □ ■
a. If located in or near State responsibility areas or lands classified as very high fire hazard severity zones, would the project substantially impair an adopted emergency response plan or emergency evacuation plan?
b. If located in or near State responsibility areas or lands classified as very high fire hazard severity zones, would the project due to slope, prevailing winds, and other factors, exacerbate wildfire risks and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
c. If located in or near State responsibility areas or lands classified as very high fire hazard severity zones, would the project require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? 657
CC 08-16-2022
657 of 1555
Environmental Checklist
Utilities and Service Systems
Final Initial Study–Negative Declaration 119
d. If located in or near State responsibility areas or lands classified as very high fire hazard severity zones, would the project expose people or structures to significant risks, including downslopes or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes?
According to the California Department of Forestry and Fire Protection (CalFIRE), the majority of the Cupertino is not located in designated California Fire Hazard Severity Zones; however, Cupertino contains and is adjacent to areas classified as moderate, high, and very high fire hazard severity zones at the wildland fringes located at the southern and western borders of the City.138 According to the Cupertino General Plan Health and Safety Element, wildfire poses a high risk to portions of Cupertino at the urban-wildland fringe. The central, urbanized portions of Cupertino are not subject to wildfire risk.139
Though there are areas within and adjacent to Cupertino that are at risk of wildfires, the CAP Update and GHG Emissions Thresholds are policy-level documents that do not propose new residential, commercial, or institutional development that could be at risk from wildfire, nor does they grant entitlements for development that would have the potential to directly cause wildfire.

Rather, the CAP Update would aim to reduce Cupertino’s contributions to and vulnerability to the effects of climate change, such as drought, wildfire, and flooding. In addition, the CAP Update includes Measures AR-2 and AR-3 to improve community preparedness and response to climaterelated hazards, including wildfire and associate air pollution risks. Thus, the CAP Update and GHG Emissions Thresholds would result in no impact related to wildfire.

Cumulative Impacts
The cumulative projects scenario is buildout of the Cupertino General Plan and the in-progress Housing Element Update. Buildout of the General Plan and in-progress Housing Element Update in Cupertino would result in an anticipated total population of 65,690 by 2030.140The CAP Update and GHG Emissions Thresholds do propose new habitable development that could be at risk from wildfire, nor do they grant entitlements for development that would have the potential to cause wildfire. Rather, the CAP Update includes measures and actions to the reduce the effects of climate change, such as drought, wildfire, and flooding. Thus, the CAP Update and the GHG Emissions Thresholds would result in no cumulative impact related to wildfire. 138 California Department of Forestry and Fire Protection (CalFIRE). 2022. Fire Hazard Severity Zone Viewer. Available:
<https://egis.fire.ca.gov/FHSZ/>. Accessed February 25, 2022. 139 Cupertino, City of. 2014. General Plan Health and Safety Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCupertino&cr=1>. Accessed February 7, 2022. 140 Cupertino, City of. 2022. Future GHG Emissions Forecasts Memorandum. 658
CC 08-16-2022
658 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 120
21 Mandatory Findings of Significance
Potentially
Significant
Impact
Less than
Significant
with
Mitigation
Incorporated
Less than
Significant
Impact
No
Impact
Does the project:
a. Have the potential to substantially degrade
the quality of the environment,
substantially reduce the habitat of a fish or
wildlife species, cause a fish or wildlife
population to drop below self-sustaining
levels, threaten to eliminate a plant or
animal community, substantially reduce
the number or restrict the range of a rare
or endangered plant or animal or eliminate
important examples of the major periods
of California history or prehistory? □ □ ■ □
b. Have impacts that are individually limited,
but cumulatively considerable?
(“Cumulatively considerable” means that
the incremental effects of a project are
considerable when viewed in connection
with the effects of past projects, the effects
of other current projects, and the effects of
probable future projects)? □ □ ■ □
c. Have environmental effects which will
cause substantial adverse effects on
human beings, either directly or indirectly? □ □ ■ □
a. Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? The intent of the CAP Update and GHG Emissions Thresholds is to reduce GHG emissions from Cupertino community operations through implementation of measures and actions related to energy use, water consumption, transportation, solid waste, and carbon sequestration. The CAP Update and GHG Emissions Thresholds are consistent with the Cupertino General Plan and encourage residents, businesses, and institutions to reduce energy and water use, fuel use, VMT, and solid waste generation and the associated GHG emissions. The CAP Update would not facilitate development that would eliminate or threaten wildlife habitats or eliminate important examples of the major periods of California history or prehistory. Therefore, as discussed in more detail in Section 4, Biological Resources, Section 5, Cultural Resources, and Section 18, Tribal Cultural 659
CC 08-16-2022
659 of 1555
Environmental Checklist
Mandatory Findings of Significance
Final Initial Study–Negative Declaration 121
Resources, the CAP Update and GHG Emissions Thresholds would result in a less-than-significant impact related to biological and cultural resources.
b. Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? Implementation of the CAP Update would result in a cumulatively beneficial reduction of GHG emissions and air pollutant emissions across Cupertino. In addition, as discussed throughout the respective cumulative impacts discussions within this document, the CAP Update and GHG Emissions Thresholds would not result in significant cumulative impacts. Rather, implementation of the CAP Update would be consistent with Cupertino General Plan policies aimed at reducing emissions of GHGs and air pollutants, reducing VMT, reducing energy and water supply demands on utilities, and decreasing solid waste generation. Therefore, the CAP Update and GHG Emissions Thresholds would result in an overall less-than-significant cumulative impact related to all CEQA topics addressed within this document.
c. Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly?
In general, impacts to human beings are associated with air quality, GHG emissions and climate change, hazards and hazardous materials, noise, and transportation impacts. As detailed in the preceding sections, the CAP Update and GHG Emissions Thresholds would not result, either directly or indirectly, in substantial adverse effects related to air quality, GHG emissions, hazards, noise, and transportation. As discussed in more detail in Section 3, Air Quality, Section 13, Noise, and Section 17, Transportation, the CAP Update could cause temporary construction impacts related to transportation, air quality, and noise that could, in turn, affect human beings but would not result in substantial adverse effects. In addition, as discussed throughout this document, the CAP Update would serve as a pathway to reduce operational GHG emissions and would result in other positive environmental and sustainability effects. These benefits include reduction in building energy and water consumption, VMT, and solid waste generation and improved air quality. Therefore, the CAP Update and GHG Emissions Thresholds would result in a less-than-significant impact related to potential for adverse effects on human beings.
660
CC 08-16-2022
660 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 122
References
List of Citations
Association of Bay Area Governments and Metropolitan Transportation Commission (ABAG-MTC). 2021. Plan Bay Area 2050. Available: <https://www.planbayarea.org/finalplan2050>.

Accessed February 10, 2022.

Bay Area Air Quality Management District (BAAQMD). 2017. Air Quality Standards and Attainment Status. Available: <http://www.baaqmd.gov/research-and-data/air-quality-standards-andattainment-status>. Accessed February 17, 2022. ______. 2017. Final Clean Air Plan: Spare the Air Cool the Climate: A Blueprint for Clean Air and Climate Protection in the Bay Area. Final 2017 Clean Air Plan. Available:
<http://www.baaqmd.gov/~/media/files/planning-and-research/plans/2017-clean-airplan/attachment-a_-proposed-final-cap-vol-1-pdf.pdf?la=en>. Accessed February 17, 2022.

California Air Resources Board (CARB). 2005. Air Quality and Land Use Handbook: A Community Health Perspective. Available at: <https://ww3.arb.ca.gov/ch/handbook.pdf>. Accessed February 17, 2022.
______. 2013. Climate Change Scoping Plan. Available:
<https://ww2.arb.ca.gov/sites/default/files/classic/cc/scopingplan/2013_update/first_upda te_climate_change_scoping_plan.pdf>. Accessed August 3, 2022. ______. 2017. AB 32 Scoping Plan. Available:
<https://ww3.arb.ca.gov/cc/scopingplan/scopingplan.htm>. Accessed February 3, 2022. ______. 2017. 2016 State Strategy for the State Implementation Plan. Available:
<https://ww3.arb.ca.gov/planning/sip/2016sip/2016sip.htm>. Accessed February 17, 2022.

CARB and California Environmental Protection Agency (CalEPA). 2009. Environmental Health and Equity Impacts from Climate Change and Mitigation Policies in California: A Review of the Literature. Available:
<http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.386.4605&rep=rep1&type=pdf >. Accessed February 23, 2022.

California Department of Conservation. 2022. California Important Farmland Finder Map. Available at: <https://maps.conservation.ca.gov/dlrp/ciff/>. Accessed February 17, 2022.

California Department of Forestry and Fire Protection (CalFIRE). 2022. Fire Hazard Severity Zone Viewer. Available: <https://egis.fire.ca.gov/FHSZ/>. Accessed February 25, 2022.

CalRecycle. 2022. SWIS Facility/Site Activity Details: Newby Island Sanitary Landfill. Available:
<https://www2.calrecycle.ca.gov/SolidWaste/SiteActivity/Details/1362?siteID=3388>.

Accessed February 25, 2022.

California Department of Transportation (Caltrans). 2020. Transportation and Construction Vibration Guidance Manual (CT-HWANP-RT-13-069.25.3). Available: <https://dot.ca.gov/-/media/dotmedia/programs/environmental-analysis/documents/env/tcvgm-apr2020-a11y.pdf>.

Accessed February 24, 2022.
661
CC 08-16-2022
661 of 1555
References
Final Initial Study–Negative Declaration 123
______. 2022. California State Scenic Highway System Map. Available:
<https://www.arcgis.com/apps/webappviewer/index.html?id=465dfd3d807c46cc8e805711 6f1aacaa>. Accessed February 16, 2022.

California Energy Commission (CEC). 2019. 2019 Building Energy Efficiency Standards for Residential and Nonresidential Buildings. Available:
<https://www.energy.ca.gov/sites/default/files/2021-06/CEC-400-2018-020-CMF_0.pdf>.

Accessed February 17, 2022.
______. 2020. Electricity Consumption by County. Available:
<http://www.ecdms.energy.ca.gov/elecbycounty.aspx>. Accessed February 22, 2022.

California Geological Survey. 2022. Earthquake Zones of Required Investigation. Available:
<https://maps.conservation.ca.gov/cgs/EQZApp/app/>. Accessed February 22, 2022.

Cupertino, City of. 2014. General Plan EIR. Available:
<http://64.165.34.13/weblink/0/doc/391441/Electronic.aspx>. Accessed February 7, 2022. ______. 2014. General Plan Land Use and Community Design Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCup ertino&cr=1>. Accessed February 7, 2022.
______. 2014. General Plan Environmental Resources and Sustainability Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCup ertino&cr=1>. Accessed February 7, 2022.
______. 2014. General Plan Health and Safety Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCup ertino&cr=1>. Accessed February 7, 2022.
______. 2014. General Plan Recreation, Parks, and Community Services Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCup ertino&cr=1>. Accessed February 7, 2022.
______. 2014. General Plan Mobility Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCup ertino&cr=1>. Accessed February 7, 2022.
______. 2014. General Plan Infrastructure Element. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCup ertino&cr=1>. Accessed February 7, 2022.
______. 2014. General Plan Appendix E: Geologic and Seismic Hazards. Available:
<https://records.cupertino.org/WebLink/docview.aspx?dbid=0&id=873201&repo=CityofCup ertino&cr=1>. Accessed February 7, 2022.
______. 2016. Bicycle Transportation Plan. Available:
<https://www.cupertino.org/home/showpublisheddocument/3479/636443578340030000> . Accessed February 24, 2022.
______. 2018. Pedestrian Transportation Plan. Available:
<https://www.cupertino.org/home/showpublisheddocument/16864/636650034974470000 >. Accessed February 24, 2022.
662
CC 08-16-2022
662 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 124
______. 2019. Zoning Map. Available at:
<https://www.cupertino.org/home/showpublisheddocument/13535/637279090319370000 >. Accessed February 17, 2022.
______. 2022. About Cupertino. Available: <https://www.cupertino.org/our-city/about-cupertino>.

Accessed February 2, 2022.
______. 2022. How to Get Around. Available: <https://www.cupertino.org/visitors/visitingcupertino/getting-around>. Accessed February 4, 2022. ______. 2022. Draft Climate Action Plan Update. Available: <https://engagecupertino.org/climateaction>. Accessed February 7, 2022. ______. 2022. Cupertino 2019 Community GHG Inventory and 2030 Community GHG Forecast. ______. 2022. Future GHG Emissions Forecasts Memorandum. ______. 2022. Cupertino Municipal Code Chapter 9.12. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-84023>.

Accessed February 22, 2022.
______. 2022. Cupertino Municipal Code Chapter 9.18. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-84663>.

Accessed February 22, 2022.
______. 2022. Cupertino Municipal Code Chapter 10.48. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-85884>.

Accessed February 22, 2022.
______. 2022. Cupertino Municipal Code Chapter 14.08. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-88157>.

Accessed February 22, 2022.
______. 2022. Cupertino Municipal Code Chapter 14.18. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-88768>.

Accessed February 16, 2022.
______. 2022. Cupertino Municipal Code Title 16. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-89338>.

Accessed February 22, 2022.
______. 2022. Cupertino Municipal Code Chapter 16.04. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-89571>.

Accessed February 22, 2022.
______. 2022. Cupertino Municipal Code Chapter 16.08. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-89752>.

Accessed February 22, 2022.
______. 2022. Cupertino Municipal Code Chapter 16.52. Available: < https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-91097>.

Accessed February 22, 2022.
______. 2022. Cupertino Municipal Code Chapter 16.58. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0- 91472#JD_Chapter16.58>. Accessed February 22, 2022.
663
CC 08-16-2022
663 of 1555
References
Final Initial Study–Negative Declaration 125
______. 2022. Cupertino Municipal Code Chapter 17.04. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0- 97167#JD_Ch.17.04>. Accessed February 16, 2022.
______. 2022. Cupertino Municipal Code Chapter 19.168. Available:
<https://codelibrary.amlegal.com/codes/cupertino/latest/cupertino_ca/0-0-0-96144>.

Accessed February 16, 2022.

Federal Highway Administration (FHWA). 2006. FHWA Highway Construction Noise Handbook. (FHWAHEP-06-015; DOT-VNTSC-FHWA-06-02). Available:
<https://www.fhwa.dot.gov/Environment/noise/construction_noise/handbook/handbook0

0.cfm>. Accessed February 24, 2022.

Federal Transit Administration. 2018. Transit Noise and Vibration Impact Assessment Manual. <https://www.transit.dot.gov/sites/fta.dot.gov/files/docs/researchinnovation/118131/transit-noise-and-vibration-impact-assessment-manual-fta-report-no0123_0.pdf>. Accessed February 24, 2022.

Iowa State University. 2022. Iowa Environmental Mesonet: San Jose Station. Available:
<https://mesonet.agron.iastate.edu/sites/monthlysum.php?station=SJC&network=CA_ASO S>. Accessed February 7, 2022.

Santa Clara County. 2022. Climate Roadmap 2030. Available:
<https://sustainability.sccgov.org/climate-roadmap-2030>. Accessed February 7, 2022. ______. 2022. Williamson Act Properties. Available at:
<https://sccplanning.maps.arcgis.com/apps/webappviewer/index.html?id=1f39e32b4c0644 b0915354c3e59778ce>. Accessed February 17, 2022.

State of California. 2018. California’s Fourth Climate Change Assessment Statewide Summary Report. Available: <http://www.climateassessment.ca.gov/state/>. Accessed February 23, 2022.

U.S. Census Bureau. 2022. Quick Facts: Cupertino City, California. Available:
<https://www.census.gov/quickfacts/fact/table/cupertinocitycalifornia/PST045221>.

Accessed February 7, 2022.

U.S. Energy Information Administration (USEIA). 2021. “California - Profile Overview.” Last modified:

February 18, 2021. Available:<https://www.eia.gov/state/?sid=CA.> Accessed February 22, 2022.
______. 2022. Natural Gas: Natural Gas Consumption by End Use. January 31, 2022. Available:
<https://www.eia.gov/dnav/ng/ng_cons_sum_dcu_SCA_a.htm>. Accessed February 22, 2022.

Valley Transportation Authority (VTA). 2014. Valley Transportation Plan 2040. Available:
<http://vtaorgcontent.s3-us-west1.amazonaws.com/Site_Content/VTP2040_final_hi%20res_030315.pdf>. Accessed February 7, 2022.
664
CC 08-16-2022
664 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 126
List of Document Preparers
Rincon prepared this CAP Update and GHG Emissions Thresholds Initial Study-Negative Declaration under contract to the City of Cupertino. Persons involved in data gathering, environmental impact analysis, quality review, graphics preparation, and document formatting include the following.

RINCON CONSULTANTS, INC.

Kelsey Bennett, Environmental/Sustainability Senior Program Manager Emily Marino, Environmental Planner
Alissa Jared, Sustainability Planner
Dario Campos, Document Formatting Specialist
Allysen Valencia, Graphics Specialist
Matthew Maddox, Environmental/Sustainability Principal
665
CC 08-16-2022
665 of 1555
References
Final Initial Study–Negative Declaration 127
This page intentionally left blank.
666
CC 08-16-2022
666 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds 128
Appendix A
Sources, Health Effects, and Typical Controls Associated with Criteria Pollutants 667
CC 08-16-2022
667 of 1555
Sources, Health Effects, and Typical Controls Associated with Criteria Pollutants Draft Initial Study–Negative Declaration A-1
Sources, Health Effects, and Typical Controls Associated with Criteria Pollutants Pollutant Sources Health Effects Typical Controls
Ozone (O3) Formed when reactive organic
gases (ROG) and nitrogen
oxides react in the presence of
sunlight. ROG sources include
any source that burns fuels
(e.g., gasoline, natural gas,
wood, oil); solvents;
petroleum processing and
storage.

Breathing difficulties, lung
tissue damage, vegetation
damage, damage to rubber
and some plastics.

Reduce motor vehicle reactive
organic gas (ROG) and
nitrogen oxide (NOX) emissions
through emission standards,
reformulated fuels,
inspections programs, and
reduced vehicle use. Limit
ROG emissions from
commercial operations,
gasoline refueling facilities,
and consumer products. Limit
ROG and NOX emissions from
industrial sources such as
power plants and
manufacturing facilities.

Carbon monoxide
(CO)
Any source that burns fuel
such as automobiles, trucks,
heavy construction and
farming equipment, residential
heating.

Chest pain in heart patients,
headaches, reduced mental
alertness.

Control motor vehicle and
industrial emissions. Use
oxygenated gasoline during
winter months. Conserve
energy
Nitrogen dioxide
(NO2)
See Carbon Monoxide. Lung irritation and damage.

Reacts in the atmosphere to
form ozone and acid rain.

Control motor vehicle and
industrial combustion
emissions. Conserve energy.

Sulfur dioxide
(SO2)
Coal or oil burning power
plants and industries,
refineries, diesel engines.

Increases lung disease and
breathing problems for
asthmatics. Reacts in the
atmosphere to form acid rain.

Reduce use of high sulfur fuels
(e.g., use low sulfur
reformulated diesel or natural
gas). Conserve energy.

Respirable
particulate matter
(PM10)
Road dust, windblown dust,
agriculture and construction,
fireplaces. Also formed from
other pollutants (NOX, SOX,
organics).

Increased respiratory disease,
lung damage, cancer,
premature death, reduced
visibility, surface soiling.

Control dust sources,
industrial particulate
emissions, woodburning
stoves and fireplaces. Reduce
secondary pollutants which
react to form PM10. Conserve
energy.

Fine particulate
matter (PM2.5)
Fuel combustion in motor
vehicles, equipment, and
industrial sources; residential
and agricultural burning. Also
formed from reaction of other
pollutants (NOX, SOX, organics,
and NH3).

Increases respiratory disease,
lung damage, cancer, and
premature death, reduced
visibility, surface soiling.

Particles can aggravate heart
diseases such as congestive
heart failure and coronary
artery disease.

Reduce combustion emissions
from motor vehicles,
equipment, industries, and
agricultural and residential
burning. Precursor controls,
like those for ozone, reduce
fine particle formation in the
atmosphere.

Lead Metal smelters, resource
recovery, leaded gasoline,
deterioration of lead paint.

Learning disabilities, brain and
kidney damage. Control metal
smelters.

No lead in gasoline or paint.

Sulfur Dioxide
(SO2)
Coal or oil burning power
plants and industries,
refineries, diesel engines.

Increases lung disease and
breathing problems for
asthmatics. Reacts in the
atmosphere to form acid rain.

Reduce use of high sulfur fuels
(e.g., use low sulfur
reformulated diesel or natural
gas). Conserve energy.

Sulfates Produced by reaction in the air
of SO2, (see SO2 sources), a
component of acid rain.

Breathing difficulties,
aggravates asthma, reduced
visibility.

See SO2
668
CC 08-16-2022
668 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds A-2
Pollutant Sources Health Effects Typical Controls
Hydrogen Sulfide Geothermal power plants,
petroleum production and
refining, sewer gas.

Nuisance odor (rotten egg
smell), headache and
breathing difficulties (higher
concentrations).

Control emissions from
geothermal power plants,
petroleum production and
refining, sewers, and sewage
treatment plants.

Visibility Reducing
Particulates
See PM2.5 Reduced visibility (e.g.,
obscures mountains and other
scenery), reduced airport
safety.

See PM2.5
Vinyl Chloride Exhaust gases from factories
that manufacture or process
vinyl chloride (construction,
packaging, and transportation
industries).

Central nervous system effects
(e.g., dizziness, drowsiness,
headaches), kidney irritation,
liver damage, liver cancer.

Control emissions from plants
that manufacture or process
vinyl chloride, installation of
monitoring systems.

Toxic Air
Contaminant
(TAC)
Combustion engines
(stationary and mobile), diesel
combustion, storage and use
of TAC-containing substances
(i.e., gasoline, lead smelting,
etc.)
Depends on TAC, but may
include cancer, mutagenic
and/or teratogenic effects,
other acute or chronic health
effects.

Toxic Best Available Control
Technologies (T-BACT), limit
emissions from known
sources.

Source: Compiled by Rincon Consultants, Inc. in March 2022 669
CC 08-16-2022
669 of 1555
Appendix B
Description of Greenhouse Gases of California Concern
670
CC 08-16-2022
670 of 1555
671
CC 08-16-2022
671 of 1555
Description of Greenhouse Gases of California Concern
Draft Initial Study–Negative Declaration B-1
Description of Greenhouse Gases of California Concern
Greenhouse Gas
Physical Description and
Properties
Global Warming
Potential
(100 years)
Atmospheric
Residence
Lifetime
(years) Sources
Carbon dioxide
(CO2)
Odorless, colorless, natural gas. 1 50–200 Burning coal, oil, natural gas, and wood; decomposition of
dead organic matter;
respiration of bacteria, plants,
animals, and fungus; oceanic
evaporation; volcanic
outgassing; cement
production; land use changes
Methane
(CH4)
Flammable gas and is the main
component of natural gas.
28141 12 Geological deposits (natural
gas fields) extraction; landfills;
fermentation of manure; and
decay of organic matter
Nitrous oxide
(N2O)
Nitrous oxide (laughing gas) is a
colorless GHG.
298 114 Microbial processes in soil and
water; fuel combustion;
industrial processes
Chloro-fluorocarbons
(CFCs)
Nontoxic, nonflammable,
insoluble, and chemically
unreactive in the troposphere
(level of air at the Earth’s
surface); formed synthetically by
replacing all hydrogen atoms in
methane or ethane with
chlorine and/or fluorine atoms.
3,800–8,100 45–640 Refrigerants aerosol
propellants; cleaning solvents.

Hydro-fluorocarbons
(HFCs)
Synthetic human-made
chemicals used as a substitute
for CFCs and contain carbon,
chlorine, and at least one
hydrogen atom.
140 to 11,700 1–50,000 Automobile air conditioners;
refrigerants
Per-fluorocarbons (PFCs)Stable molecular structures and only break down by ultraviolet
rays about 60 kilometers above
Earth’s surface.
6,500 to 9,200 10,000–50,000 Primary aluminum production; semiconductor manufacturing
Sulfur
hexafluoride
(SF6)
Human-made, inorganic,
odorless, colorless, and
nontoxic, nonflammable gas.
22,800 3,200 Electrical power transmission
equipment insulation;
magnesium industry,
semiconductor manufacturing;
a tracer gas
141 The City of Cupertino used a 20-year Global Warning Potential for methane. 672
CC 08-16-2022
672 of 1555
City of Cupertino
Climate Action Plan Update & CEQA GHG Emissions Thresholds B-2
Greenhouse Gas
Physical Description and
Properties
Global Warming
Potential
(100 years)
Atmospheric
Residence
Lifetime
(years) Sources
Nitrogen
trifluoride
(NF3)
Inorganic, is used as a
replacement for PFCs, and is a
powerful oxidizing agent.
17,200 740 Electronics manufacture for
semiconductors and liquid
crystal displays.

Source: Compiled by Rincon Consultants, Inc. in March 2022 673
CC 08-16-2022
673 of 1555
Attachment A
Subject: Detailed Responses to Questions from June 2022 City Council Study Session Submitted by: Andre Duurvoort, Sustainability Division Manager On June 21, the Council reviewed the Public Review Draft Climate Action Plan (CAP) 2.0 and Councilmembers asked clarifying questions and provided feedback on the draft plan.

Below are responses to questions raised by Councilmembers from the June 21 Study Session.

Q: One thing that would help me is if the different actions to be collected together, e.g., in one of the appendices, rather than scrolling through the whole doc, could see everything easily.

A: See CAP 2.0 Greenhouse Gas Thresholds Draft IS-ND Initial Study, pages 15 – 28 for this listing. (https://engagecupertino.org/11845/widgets/34981/documents/31752) Q: How to help homeowners in preparation of what will be needed as we make these changes to all-electric. If we can have funding support for residents and commercial buildings to electrify old buildings.

A: For Measure BE-2, Actions 1 to 3 commit the City to developing an existing building electrification strategy (BES) as a first step towards implementing a residential building electrification ordinance. This action is moving forward this fiscal year in the City Work Program.

Existing building electrification is relatively untested at a city scale, suggesting that a Cupertino-specific strategy is key to successful outcomes. The BES is designed to develop options, such as ordinances or incentive programs, and give special consideration to the potential equity impacts of an electrification ordinance by investigating up-front and on-bill costs of electrification to residents, potential impacts to renters, potential impacts to electrical grid resiliency (Action 1), and by specifically targeting under-represented groups for feedback on BES development (Action 3). {Appendix E, pg. 14} In general, electrification of existing buildings presents many questions that need to be answered, especially about costs to upgrade buildings and who bears those costs. Actions 13 674
CC 08-16-2022
674 of 1555
and 14 build the support and funding pathway to make existing building electrification possible, particularly looking at financial supports for low- or fixed-income residents of the City. Demonstrating cost effective pathways for existing building electrification will be a key step before mandatory requirements can be set. {Appendix E, pg. 18} Actions 4 to 7 commit the City to adopting an electrification ordinance for existing residential buildings by 2023, to be enforced through a comprehensive and equitable permitting compliance program. To address these GHG emissions, the City is committed to maintain its electrification ordinance for newly constructed buildings. HVAC system and hot water heaters are targeted in the CAP 2.0 due to their large contribution to residential natural gas end-uses and the cost-effectiveness associated with their replacement on burnout. {Appendix E, pg. 14, 15}
Q: BE-2 Electrify existing residential compared to BE-3 Electrify commercial buildings.

Seems like it is less strict on commercial buildings. What is the philosophy behind that, did this take into consideration structures like the Apple Headquarters? Natural gas usage from residential buildings accounted for about 13% of GHG emissions in Cupertino in 2018. Natural gas usage from commercial buildings accounted for about 15% of GHG emissions in Cupertino in 2018. The proposed measures for both residential and commercial sectors are identical, however the timeline for the commercial electrification ordinance is phased later in the Plan. This is to allow for time for study and engagement - technologies that currently exist for electrifying the home have proven to be more difficult at the scale of large commercial, multi-family, and industrial buildings. Fortunately, for many large commercial enterprises in our region, corporate sustainability programs are moving towards decarbonization and clean energy strategies independent of government actions. This trend has proven to be durable among Silicon Valley companies and allows the City to learn from and partner with corporate actors where appropriate, while providing specific support and resources for small- and medium-sized businesses. {Appendix E, pg. 23} To close the knowledge gap about commercial building electrification in Cupertino, Actions 1 through 4 (BE-3) develops options and opportunities associated with electrification of commercial natural gas appliances.

To address these GHG emissions, the electrification strategy will provide City Council with more analysis and options for how to address replacement of commercial equipment at time of major renovation and time of replacement. {Appendix E, pg. 20-21} Q: Looking at City of Emeryville, believe they have installed solar on most if not all cityowned buildings, can we look into this as a policy as we are doing maintenance and upgrades on buildings. So when we do remodeling or rebuild, we will put our 100% effort to make our City facilities a model of climate action. Another model example was Sunnyvale City Hall.
675
CC 08-16-2022
675 of 1555
A: The project team decided to focus on community-based Measures in this update to the Climate Action Plan 2.0. Once the CAP 2.0 is adopted by City Council, the Sustainability Division will take lead to adapt the plan and internalize it into City operations. The key areas for City operations are to renovate the existing facilities which utilize the most fossil fuels, such as the Quinlan Community Center and City Hall, as well as addressing the vehicle fleet and availability of electric vehicle charging ports. Some of these needs are being addressed in the existing Capital Improvement Program (CIP).

Q: Native plantings: can we have some policy and funding for both residents and commercial corridor owners to convert to native plantings. E.g., Stevens Creek, have ornamental grass or turf, a way to help convert a percentage to native plantings with drip irrigation rather than just have the commercial properties turn off their water and have the turf die and not be watered. If we have a current effort, would like to hear about this.

A: The City is currently piloting a similar use of staff time in the Climate Victory Gardens Pilot program to provide technical and administrative support directly to property owners who wish to remove lawns and install drought-tolerant gardens. The City also took action last summer to waive certain planning fees for projects that will remove grass and replace with drought-tolerant plantings. Action 14 (BE-2) commits the City to continued use of staff time to support residents to apply for all available rebates and to get unbiased technical advice. {Appendix E, pg. 18}
Q: Public comment: Concern about converting lawns to non-permeable surface, need groundwater to recharge aquifers to restore them. Can that be put into consideration? Not only conservation, but also don’t want to convert surface to concrete.

A: Several initiatives and existing policies are in place considering non-permeable surfaces, including a rebate program that will pay residents to install permeable surfaces for their driveways.1 Turf grass typically requires large amounts of water throughout the growing season, while native or climate-adapted plants are usually more drought resistant, require less water, and provide an ecosystem including water, food, and shelter for native birds, insects, and other kinds of wildlife. Following the success of the program in converting residential and commercial turf in Cupertino, Action 8 (WW-1) commits the City to expanding this program and partnering with Valley Water to make the program regional. {Appendix E, pg. 64-65}
Q: TR-2: Achievability about the 29% public transit mode share in TR-2. I think it is very aspirational, what is our current share public transit, thinks it is 7% now at the most, do we have data on that. A big question, what transit options even exist to take them to their job locations. Some analysis. Big issue for Cupertino residents is that we do not have 1 https://www.cupertino.org/our-city/departments/environment-sustainability/water/stormwater-pollutionprevention/clean-water-rebates 676
CC 08-16-2022
676 of 1555
enough transit except a few bus lines which keep getting moved and getting reduced by VTA.

A: Reducing transportation emissions and becoming a carbon neutral city means reducing the number of miles driven by fossil fuel-powered vehicles, particularly passenger vehicles, which account for 43% of GHG emissions in the City of Cupertino. Approximately 2% of trips are conducted by public transit today. The project team believes that setting an aggressive target for transit and active mode share is an important feature of the CAP 2.0.

The City recognizes the reality that increasing public transit mode share on this order of magnitude in California has only been accomplished in a handful of large, dense cities.

Given this, the City recognizes that Measure TR-2 presents a stretch goal and may be difficult to achieve. There is potentially a large upside to set aggressive reach goals within the CAP 2.0 - cities with bold targets are better positioned for future funding. For example, the City was just awarded $8.5 million from the State to expand upon the Via Shuttle program2, with the express purpose of improved connections to regional rail and increasing services for disadvantaged communities and seniors.

There is also little risk in setting a reach goal for transit in the CAP 2.0. Plans are expected to change and adapt as local challenges are encountered during implementation of the plan. At a bare minimum (lower bound public transit scenario), the City expects to be able to achieve a 5% public transit mode share by 2030. Under this lower bound scenario, Cupertino would not meet its aggressive local GHG target (decrease per capita GHG emissions 50% below 2010 levels). However, the City would still exceed the State-minimum target (SB 32).

These scenarios and the complete analysis are detailed in Appendix E, Table 12. Therefore, at a minimum, Cupertino expects to exceed the state level target regardless of the performance of Measure TR-2.
{Appendix E, pg. 38-41}
{Appendix E, pg. 50}
Q: Follow up from speaker’s comment on Valley Water – just toured advanced water purification center with VM Chao – we received a recommendation report, this is timely.

Valley Water is providing a water efficient new development ordinance with 17 measures. We don’t have to adopt all of them but Valley Water can provide TA to adopt parts of it. Regional partnership is really, really important. A major part of CAP is water.

We need to work with other cities and regional entities to develop real action items.

A: Action 1 (WW-1) commits the City to bringing this same water efficient new development model ordinance for the consideration of the City Council. In addition, actions 2-4 commit the City to working with Santa Clara Valley Water to engage with the 2 https://www.cupertino.org/Home/Components/News/News/5664/26?backlist=%2f 677
CC 08-16-2022
677 of 1555
community, including low-income and fixed income people, communities of color, elders, and disabled individuals with access needs, about the benefits and opportunities associated with more efficient water consumption.

Q: Also from the speaker comments: One thing we could expand is to tie the Housing Element to the CAP, because it has everything to do with electrification, saving water, public transit. I don’t know how we can tie them together. Maybe more detailed plan when we have our Housing Element General Plan amendments.

A: The CAP 2.0 is a city-wide plan developed with the guidance of the General Plan – Environment and Sustainability Element. All city-wide plans cross-reference and “speak” to one another as specific projects are carried out in the future. The main driver of sustainability into all future developments, including housing, are the building codes, programs and services that will result from implementation of the CAP 2.0. Measures BE-1 and BE-2, for example, contemplate changes to the building codes which will require increasing electrification not only for new construction, but for remodels as well in the future. Another example of how the CAP 2.0 ties into future housing developments is by the creation of a GHG streamlining checklist, which is a tool that developers and City planners can use to align the development with the Measures in the CAP 2.0. This topic is explained further in the next question. {Appendix E, pg. 70}
Q: CEQA – for new development, having this CAP CEQA-qualified, going to the Appendix G Checklist from CEQA, will this allow a developer to go to the GHG portion of the checklist, and be able to check off less than significant with mitigation incorporated? Is this the idea behind this? Would like the CAP to include more information about this CEQA issue to explain it better to the public. Like to hear more about what it means to be a CEQA qualified plan in the future.

A: This topic was presented to the Cupertino Environmental Review Committee to seek guidance on the CEQA approach. In response to this question, the project team has uploaded that presentation and staff report to the project website at www.cupertino.org/climateaction. The Cupertino General Plan – Environment and Sustainability Element requires that the Climate Action Plan be “qualified.” This means the project team takes the extra step of providing a rigorous calculation of the greenhouse gas reduction potential of the CAP and preparing CEQA environmental documents for the CAP itself. This work can then be referenced by future projects, such as a construction project, to “streamline” their environmental permitting. This streamlining feature of the CAP 2.0 is limited to the GHG section, which is only one of the many environmental topics that must be studied under CEQA. This streamlining feature is designed to better align GHG analysis and sustainability outcomes across many future projects where applicable. 678
CC 08-16-2022
678 of 1555
Once the CAP 2.0 is adopted by Council, the project team will create a GHG checklist. If a future project can demonstrate compliance with this checklist, the City can quickly ensure that the Climate Action Plan has been considered in the design of that project.

The City still retains all options of review if the streamlined GHG checklist approach is not suitable for a certain project, including the use of GHG reduction thresholds which are contained in the CAP 2.0 CEQA documentation.

See Appendix E, Introduction, for further description of the CEQA qualification.

See also CAP 2.0 Greenhouse Gas Thresholds Draft IS-ND Initial Study, pages 32-33 for a more detailed description.
(https://engagecupertino.org/11845/widgets/34981/documents/31752) Q: The person from Sierra Club mentioned the gas fuel cell, I don’t understand what is that, could staff help clarify that and is it possible to consider that.

A: A fuel cell is a stationary machine that produces electricity on-site using a fuel, typically natural gas or biofuel. This machine provides electric power to the Apple headquarters campus and is supplied with a normal gas pipeline. On June 29, 2012, the proposed Apple Campus 2 Project was certified as an Environmental leadership Development Project (Leadership Project) by the Governor’s Office pursuant to the Jobs and Economic Improvement Through Environmental Leadership Act of 2011 (AB 900). Under this certification, Apple agreed to directly purchase renewable fuels to power their fuel cell.

The fuel cell asset at the Apple headquarters consumes a relatively large amount of fuel.

Using standard carbon accounting methods, both Cupertino and Apple record this portion of energy consumption as carbon-free. This process is verified annually through Apple’s regular sustainability reporting. Therefore, as a key action towards decarbonization of the City, Cupertino will track the GHG reduction benefits of Apple’s biofuel purchases (Action 1, BE-5). As part of this action, Cupertino will continue to verify and review Apple’s reporting methodologies each year. This process is similar to the carbon accounting for clean electricity provided to our residents by Silicon Valley Clean Energy, which allows us to demonstrate that most of our electricity is carbon-free.

Action 2 (BE-5) proposes that the City not only continue to verify this arrangement, but also develop a strategy to address how biofuels could fit into a carbon-neutral City of the future.

This is an emerging topic in carbon accounting that will be pursued with maximum transparency, as it affects multiple City issue areas, such as our plan to sequester carbon using compost under SB1383.
{Appendix E, pg. 27}
679
CC 08-16-2022
679 of 1555

CITY OF CUPERTINO
Agenda Item
22-11285 Agenda Date: 8/16/2022
Agenda #: 13.

Subject: Consider accepting Accounts Payable for the periods ending June 6, 2022, June 13, 2022, June 20, 2022, June 27, 2022 (Postponed from July 19, 2022); and July 5, 2022 A. Adopt Resolution No. 22-084 accepting Accounts Payable for the period ending June 6, 2022; B. Adopt Resolution No. 22-085 accepting Accounts Payable for the period ending June 13, 2022;
C. Adopt Resolution No. 22-086 accepting Accounts Payable for the period ending June 20, 2022;
D. Adopt Resolution No. 22-087 accepting Accounts Payable for the period ending June 27, 2022; and
E. Adopt Resolution No. 22-099 accepting Accounts Payable for the period ending July 5, 2022 CITY OF CUPERTINO Page 1 of 1 Printed on 8/11/2022
powered by Legistar™680
CC 08-16-2022
680 of 1555

CITY COUNCIL STAFF REPORT
Meeting: August 16, 2022
Subject
Consider accepting Accounts Payable for the periods ending June 6, 2022; June 13, 2022; June 20, 2022; June 27, 2022; and July 5, 2022
Recommended Action
A. Adopt Resolution No. 22-084 accepting Accounts Payable for the period ending June 6, 2022;
B. Adopt Resolution No. 22-085 accepting Accounts Payable for the period ending June 13, 2022;
C. Adopt Resolution No. 22-086 accepting Accounts Payable for the period ending June 20, 2022;
D. Adopt Resolution No. 22-087 accepting Accounts Payable for the period ending June 27, 2022; and
E. Adopt Resolution No. 22-XXX accepting Accounts Payable for the period ending July 5, 2022
Discussion
On July 25, 2022, the Audit Committee reviewed the Accounts Payable registers as part of the Monthly Treasurer’s Report for June 2022. This supplemental staff report provides responses to the Audit Committee’s inquiries.

Responses to Audit Committee’s Inquiries
#34625, 6/24/2022, West Valley Community Svcs Agency, $60,756.86 The payment included $7,277.64 for the Homeless Jobs Program, a pilot job training program, and $53,479.22 in operating and personnel expenses for the Vista Village Renovation Project. The Vista Village Renovation Project costs are CDBG grant expenditures.
#730573, 7/1/2022, County of Santa Clara, $18,109.67
The payment was for supplemental law enforcement services on behalf of the Apple Worldwide Developers Conference. The City coordinates billing for supplemental law 681
CC 08-16-2022
681 of 1555
enforcement services. It is pass-through revenue with a 15% administrative fee for the City.
#730582, 7/1/2022, Fremont Union High School District, $40,575.00 The payment was for the Summer Intensive Geometry (SIG) program, which had 88 participants. This payment is the closing payment to the consultant. #730612, 7/1/2022, Applied Development Economics, $18,600.00 The payment was for professional services for Economic Development strategy data. The Economic Development Manager manages the project and confirms they are tracking expenses against the total approved amount of $30,000. There is one more invoice to submit to Finance.

Sustainability Impact
No sustainability impact.

Fiscal Impact
No fiscal impact.
_____________________________________
Prepared by: Thomas Leung, Senior Management Analyst
Reviewed by: Kristina Alfaro, Director of Administrative Services and City Treasurer Approved for Submission by: Dianne Thompson, Acting City Manager 682
CC 08-16-2022
682 of 1555
RESOLUTION NO. 22-XXX

A RESOLUTION OF THE CUPERTINO CITY COUNCIL

RATIFYING CERTAIN CLAIMS AND DEMANDS PAYABLE IN THE

AMOUNTS AND FROM THE FUNDS AS HEREINAFTER DESCRIBED FOR

GENERAL AND MISCELLANEOUS EXPENDITURES FOR THE PERIOD
ENDING JUNE 6, 2022
WHEREAS, the Director of Administrative Services or her designated representative has certified to accuracy of the following claims and demands and to the availability of funds for payment hereof; and
WHEREAS, the said claims and demands have been audited as required by law.

NOW, THEREFORE, BE IT RESOLVED that the City Council does hereby allow the following claims and demands in the amounts and from the funds as hereinafter set forth in the attached Payment Register.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 16
th day of August, 2022 by the following vote:

Vote Members of the City Council
AYES:

NOES:

ABSENT:

ABSTAIN:

SIGNED:
________
Darcy Paul, Mayor
City of Cupertino
________________________
Date
ATTEST:
________
Kirsten Squarcia, City Clerk
________________________
Date
683
CC 08-16-2022
683 of 1555
Resolution No. 22-XXX

Page 2 ends

CERTIFICATION
The Administrative Services Director hereby certifies to the accuracy of said records and to the availability of funds for payment.

CERTIFIED:

Kristina Alfaro, Director of Administrative Services
684
CC 08-16-2022
684 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Main Account - Main Checking Account
Check
730351 06/03/2022 Open Accounts Payable ADVANTAGE GRAFIX $1,469.47 Invoice Date Description Amount
46593 05/11/2022 Business Cards - Robert, Mariah, Christina, Molly, Jenny, Daniel
$641.66
46651 05/25/2022 Andy - Management Analyst color x250 Business cards
$106.94
46494 04/06/2022 Kennedy Bikeway Posters for SR2S Program $47.57 46594 05/11/2022 Business Cards for Monica, Marvin, Tony, Haley $427.77 46648 05/25/2022 MS Bike Skills workshop flyer for SR2S Program $245.53 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,255.59
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$106.94
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$106.94
730352 06/03/2022 Open Accounts Payable Asmita Deshpande $497.25 Invoice Date Description Amount
Spring Payment 1 05/24/2022 payment for spring classes $497.25 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$497.25
730353 06/03/2022 Open Accounts Payable BARTH ROOFING COMPANY, INC $34,777.60 Invoice Date Description Amount
11164 05/25/2022 Facilities - Recoat Service Center Shop Building $34,777.60 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$34,777.60
730354 06/03/2022 Open Accounts Payable CAL-LINE EQUIPMENT CO INC $83,539.99 Invoice Date Description Amount
04006473 05/24/2022 Fleet - Stump Grinder 3100TOW $83,539.99 Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$83,539.99
730355 06/03/2022 Open Accounts Payable CATHOLIC CHARITIES OF S C COUNTY
$3,008.92
Invoice Date Description Amount
CCOCDBGQ3FY2122 05/26/2022 GF HSG LTCOP Q3 21-22 $3,008.92 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,008.92
730356 06/03/2022 Open Accounts Payable COMCAST $2,201.43 Invoice Date Description Amount
3310 - 050722 05/07/2022 8155 40 065 0183310 $2,201.43
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$249.47
user: Vi Tran Pages: 1 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 685
CC 08-16-2022
685 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$737.46
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$1,214.50
730357 06/03/2022 Open Accounts Payable County of Santa Clara $750.00 Invoice Date Description Amount
DIR-2021-022 05/26/2022 Exempt Filing $50.00
R-2021-038 05/26/2022 Exempt Filing $50.00
R-2021-046 05/26/2022 Exempt Filing $50.00
R-2021-052 05/26/2022 Exempt Filing $50.00
R-2022-003 05/26/2022 Exempt Filing $50.00
RM-2021-030 05/26/2022 Exempt Filing $50.00
RM-2021-040 05/26/2022 Exempt Filing $50.00
TR-2019-035 05/26/2022 Exempt Filing $50.00
TR-2022-002 05/26/2022 Exempt Filing $50.00
TR-2022-008 05/26/2022 Exempt Filing $50.00
TR-2022-010 05/26/2022 Exempt Filing $50.00
TR-2022-014 05/26/2022 Exempt Filing $50.00
TR-2022-017 05/26/2022 Exempt Filing $50.00
TUP-2021-004 05/26/2022 Exempt Filing $50.00
TUP-2022-001 05/26/2022 Exempt Filing $50.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$750.00
730358 06/03/2022 Open Accounts Payable Cupertino Union School District $8,705.80 Invoice Date Description Amount
AM22-00239 05/26/2022 Clean Water and Storm Protection Fee Reimbursement FY 2020-2021
$8,705.80
Paying Fund Cash Account Amount
230 - Env Mgmt Cln Crk Strm Drain 230 100-100 (Cash & Investments Assets Operating Cash)
$8,705.80
730359 06/03/2022 Open Accounts Payable EMC PLANNING GROUP, INC. $86,271.12 Invoice Date Description Amount
22-050 01/31/2022 Housing Element Consultant 2022/01 $23,490.79 22-102 02/28/2022 Housing Element Consultant 2022/02 $35,465.06 22-155 03/31/2022 Housing Element Consultant 2022/03 $782.75 22-167 03/31/2022 Housing Element Consultant 2022/03 $26,532.52 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$86,271.12
730360 06/03/2022 Open Accounts Payable Global Knowledge Training LLC $1,515.25 Invoice Date Description Amount
22215817 05/11/2022 Rabeya - JumpStart to using Modern JavaScript $1,515.25 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$1,515.25
730361 06/03/2022 Open Accounts Payable GOT GOPHERS, INC. $310.00 Invoice Date Description Amount
28767 05/31/2022 Monthly Trapping Mary Ave. Bridge & Blaney Ave. $310.00 user: Vi Tran Pages: 2 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 686
CC 08-16-2022
686 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$310.00
730362 06/03/2022 Open Accounts Payable Griffin Structures Inc. $6,038.20 Invoice Date Description Amount
GSI-CLEP-19 04/30/2022 Cupertino Library Expansion through 4/30/2022 $6,038.20 Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$6,038.20
730363 06/03/2022 Open Accounts Payable KNORR SYSTEMS $47,679.06 Invoice Date Description Amount
SI239233 05/25/2022 Facilities - Variable Frequency Drive for BBF Slide Pool
$47,679.06
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$47,679.06
730364 06/03/2022 Open Accounts Payable M.T. TIRE SERVICE $1,114.15 Invoice Date Description Amount
19505 05/16/2022 Fleet - Service Call Ford F550 UN#U79 $1,114.15 Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$1,114.15
730365 06/03/2022 Open Accounts Payable MOUNTAIN VIEW GARDEN CENTER
$445.24
Invoice Date Description Amount
110232 05/25/2022 Streets - Drain Rock 3/4 $222.62
110237 05/25/2022 Streets - Drain Rock 3/4 $222.62
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$445.24
730366 06/03/2022 Open Accounts Payable PG&E $408.34
Invoice Date Description Amount
4212-052622 05/26/2022 3535370421-2 4/22/22-5/20/22 $85.81 0349-052622 05/26/2022 3042033034-9 4/21/22-5/19/22 $201.47 9785-052722 05/27/2022 2016881978-5 4/21/22-5/19/22 $9.76 8413-052722 05/27/2022 4685859841-3 4/22/22-5/22/22 $111.30 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$408.34
730367 06/03/2022 Open Accounts Payable PROJECT SENTINEL $13,196.29 Invoice Date Description Amount
PSQ3FY2122 05/26/2022 BMR AHF Rental Mediation Q3 FY21-22 $13,196.29 Paying Fund Cash Account Amount
265 - BMR Housing 265 100-100 (Cash & Investments Assets Operating Cash)
$13,196.29
730368 06/03/2022 Open Accounts Payable PTS COMMUNICATIONS $543.00 Invoice Date Description Amount
2087469 05/12/2022 payphone svcs 6/1/22-6/30/22 $543.00 user: Vi Tran Pages: 3 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 687
CC 08-16-2022
687 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$482.66
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$60.34
730369 06/03/2022 Open Accounts Payable Ricardo Acevedo $292.80 Invoice Date Description Amount
RicA 05-20-2022 05/20/2022 Ricardo Acevedo Check Req $292.80 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$292.80
730370 06/03/2022 Open Accounts Payable Saccomuro Corporation $5,000.00 Invoice Date Description Amount
Cupertino-001 05/13/2022 CREST Awards Ceremony - Catering $5,000.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$5,000.00
730371 06/03/2022 Open Accounts Payable SENIOR ADULTS LEGAL

ASSISTANCE
$4,769.49
Invoice Date Description Amount
SALAQ3FY2122 05/27/2022 HSG SALA Q3 FY21-22 $4,769.49
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,769.49
730372 06/03/2022 Open Accounts Payable SVA Architects, Inc. $5,091.00 Invoice Date Description Amount
59238 04/30/2022 Cupertino Library Landscape Design, services through 4/30/2022
$5,091.00
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$5,091.00
730373 06/03/2022 Open Accounts Payable Town of Los Gatos $577.80 Invoice Date Description Amount
6100000031 06/01/2022 Streets: van truck sharing los gatos 11/22/21-11/24/21 $577.80 Paying Fund Cash Account Amount
230 - Env Mgmt Cln Crk Strm Drain 230 100-100 (Cash & Investments Assets Operating Cash)
$577.80
730374 06/03/2022 Open Accounts Payable Alexander Bunch $35.00 Invoice Date Description Amount
Bunch051322 05/13/2022 Live Scan and Fingerprinting Reimbursement $35.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$35.00
730375 06/03/2022 Open Accounts Payable CAM HISCOCK $648.62 Invoice Date Description Amount
310535 05/27/2022 REFUND 11005 NORTHSEAL BLD-2022-0969 VOID $648.62 Paying Fund Cash Account Amount
user: Vi Tran Pages: 4 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 688
CC 08-16-2022
688 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$648.62
730376 06/03/2022 Open Accounts Payable CHANG KIM $74.00 Invoice Date Description Amount
310281 05/26/2022 REFUND 7521 DE FOE DR BLD-2022-0915 SCOPE

OF WORK CHANGED
$74.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$74.00
730377 06/03/2022 Open Accounts Payable DEEPIKA RAYALA $530.00 Invoice Date Description Amount
RefundCheck#229 05/31/2022 PARTIAL REFUND ON CITATION #22000262A - 19147 LOREE AVENUE
$530.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$530.00
730378 06/03/2022 Open Accounts Payable LINDA NI-HUNG LIU, TRUSTEE ET AL.
$2,130.00
Invoice Date Description Amount
Check#7225112252 05/31/2022 PARTIAL REFUND ON CITATION #21001029A - 21102 LAVINA COURT
$2,130.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,130.00
730379 06/03/2022 Open Accounts Payable NICOLE GAXIOLA $261.79 Invoice Date Description Amount
310228 06/01/2022 REFUND 10104 BYRNE AVE BLD-2022-0923

WITHDRAWN
$261.79
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$261.79
730380 06/03/2022 Open Accounts Payable Synergy Global Housing LLC $159.00 Invoice Date Description Amount
310586 06/01/2022 The applicant paid for the wrong business category $159.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$159.00
730381 06/03/2022 Open Accounts Payable TESHA LOPEZ $179.10 Invoice Date Description Amount
310158 05/27/2022 REFUND 10162 S TANTAU AVE BLD-2022-0914

WITHDRAWN
$179.10
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$179.10
Type Check Totals: 31 Transactions $312,219.71
user: Vi Tran Pages: 5 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 689
CC 08-16-2022
689 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
EFT
34397 05/31/2022 Open Accounts Payable EMPLOYMENT DEVEL DEPT $44,955.39 Invoice Date Description Amount
05202022 05/20/2022 CA State Tax pp 5/7/22-5/20/22 $44,955.39 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$44,955.39
34398 05/31/2022 Open Accounts Payable IRS $146,964.41
Invoice Date Description Amount
05202022 05/20/2022 Federal Tax pp 5/7/22-5/20/22 $146,964.41 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$146,964.41
34399 06/02/2022 Open Accounts Payable P E R S $526.36
Invoice Date Description Amount
05012022 05/20/2022 PERS Council pp 5/1/22-5/31/22 $526.36 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$526.36
34400 06/02/2022 Open Accounts Payable P E R S $159,631.79 Invoice Date Description Amount
05202022 05/20/2022 PERS pp 5/7/22-5/20/22 $159,631.79
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$159,631.79
34401 06/03/2022 Open Accounts Payable ABAG POWER- ASSOCIATION OF

BAY AREA GOVERNMENTS
$4,400.89
Invoice Date Description Amount
AR028656 06/01/2022 FY 22 AMD Level Charge-Nat Gas $4,400.89 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,961.49
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$439.40
34402 06/03/2022 Open Accounts Payable ALL CITY MANAGEMENT

SERVICES
$14,553.28
Invoice Date Description Amount
77635 05/17/2022 School Crossing Guard Services for 5/1/2022 to 5/14/2022
$14,553.28
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$14,553.28
34403 06/03/2022 Open Accounts Payable Amazon Capital Services $54.55 Invoice Date Description Amount
1JKC-3FMD-769J 05/30/2022 HUANUO Dual Monitor Stand, Fully Adjustable Monitor Desk Mount G
$54.55
Paying Fund Cash Account Amount
user: Vi Tran Pages: 6 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 690
CC 08-16-2022
690 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$54.55
34404 06/03/2022 Open Accounts Payable BIKEEP INC. $49.00 Invoice Date Description Amount
17843 05/17/2022 Library Bike Locker Monthly Service $49.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$49.00
34405 06/03/2022 Open Accounts Payable CALIFORNIA COMMERCIAL FENCE $220,774.97 Invoice Date Description Amount
2371 05/31/2022 Progress Payment 2 Regnart Creek Trail Fencing through May 2022
$220,774.97
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$220,774.97
34406 06/03/2022 Open Accounts Payable Callander Associates Landscape Architecture
$9,579.23
Invoice Date Description Amount
22015-1 05/24/2022 Memorial Park Ballfield Landscape Arche Services $3,632.05 21059-6 05/31/2022 Wilson Community Park Garden Services through 4/30/2022
$120.95
21059A-3 05/31/2022 Wilson Park Comm Garden Ceramic Studio ADA services thru 4/30/22
$5,826.23
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,632.05
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$5,947.18
34407 06/03/2022 Open Accounts Payable CUPERTINO SUPPLY INC $316.45 Invoice Date Description Amount
290889 05/19/2022 Grounds - PVC Pipe and Bush $84.81
290873 05/19/2022 Trees/ROW - Tow Bolt Repair Coupling $61.48 291218 05/24/2022 Facilities - Copper Tee, Powerbrush Nutdriver for Outside
$14.56
291029 05/20/2022 Facilities - Ball Valve, Elbow, Coupling, Adapter $155.60 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$316.45
34408 06/03/2022 Open Accounts Payable DAVID J. POWERS & ASSOCIATES, INC.
$1,878.18
Invoice Date Description Amount
28069 05/25/2022 SO #3 Regnart Creek Trail Fencing Bird Nesting Study thru 4/30/2
$1,878.18
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$1,878.18
user: Vi Tran Pages: 7 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 691
CC 08-16-2022
691 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
34409 06/03/2022 Open Accounts Payable DELL MARKETING L.P. $49,275.59 Invoice Date Description Amount
10587299631 05/27/2022 25x Dell Latitude 5430 & 1x Wireless Keyboard and Mouse
$49,275.59
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$49,275.59
34410 06/03/2022 Open Accounts Payable EDGES ELECTRICAL GROUP $1,071.34 Invoice Date Description Amount
S5565876.001 05/24/2022 Streets - 6AWG Sleever $1,071.34 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,071.34
34411 06/03/2022 Open Accounts Payable Evelyn Moran $220.00 Invoice Date Description Amount
EvelynM02212022 02/21/2022 Cell phone reimbursement 1/22/22-2/21/22 $55.00 EvelynM03212022 03/21/2022 Cell phone reimbursement 2/22/22-3/21/22 $55.00 EvelynM04212022 04/21/2022 Cell phone reimbursement 3/22/22-4/21/22 $55.00 EvelynM052122 05/21/2022 Cell phone reimbursement 4/22/22-5/21/22 $55.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$220.00
34412 06/03/2022 Open Accounts Payable GIULIANI & KULL - SAN JOSE, INC. $4,355.00 Invoice Date Description Amount
16917 04/30/2022 Lawrence Mitty Annexation Documents, Services 3/1/2022-3/31/2022
$4,355.00
Paying Fund Cash Account Amount
280 - Park Dedication 280 100-100 (Cash & Investments Assets Operating Cash)
$4,355.00
34413 06/03/2022 Open Accounts Payable GOLDFARB & LIPMAN $992.00 Invoice Date Description Amount
145313 05/24/2022 Housing Legal Review 2022/05 $992.00
Paying Fund Cash Account Amount
265 - BMR Housing 265 100-100 (Cash & Investments Assets Operating Cash)
$992.00
34414 06/03/2022 Open Accounts Payable GRAINGER INC $26.13 Invoice Date Description Amount
9322156770 05/23/2022 Facilities - Gen Purpose Relay 11 Pin Square $26.13 Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$26.13
34415 06/03/2022 Open Accounts Payable IMPEC GROUP INC,. $760.41 Invoice Date Description Amount
2204224 04/30/2022 Facilities - April 2022 Linda Vista Trail Gate $760.41 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$760.41
user: Vi Tran Pages: 8 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 692
CC 08-16-2022
692 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
34416 06/03/2022 Open Accounts Payable IMPERIAL SPRINKLER SUPPLY, INC
$984.20
Invoice Date Description Amount
5114674-00 05/16/2022 Trees/ROW - Leemco Stabilizer, Brass Rem Cntrl $340.45 5121197-00 05/16/2022 Trees/ROW - Credit for Invoice# 5096754-01 ($45.96) 5096754-03 05/16/2022 Trees/ROW - Coupling, Yellow Tag, Sensor Cable, Stabilizer
$689.71
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$984.20
34417 06/03/2022 Open Accounts Payable JAM Services, Inc $83,098.69 Invoice Date Description Amount
157378 05/12/2022 Quote JBM122721B2, Poles for Homestead & De Anza and Storage
$83,098.69
Paying Fund Cash Account Amount
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$83,098.69
34418 06/03/2022 Open Accounts Payable Jill Haff $405.60 Invoice Date Description Amount
Spring Payment 1 05/24/2022 payment for spring classes $405.60 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$405.60
34419 06/03/2022 Open Accounts Payable JULIA KINST $55.00 Invoice Date Description Amount
JuliaK05192022 05/19/2022 Cell phone reimbursement 4/20/22-5/19/22 $55.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$55.00
34420 06/03/2022 Open Accounts Payable KEVIN RIEDEN $165.00 Invoice Date Description Amount
KevinR031222 03/12/2022 Cell phone reimbursement through 3/12/22 $55.00 KevinR04122022 04/12/2022 Cell phone reimbursement through 4/12/2022 $55.00 KevinR05122022 05/12/2022 Cell phone reimbursement through 5/12/2022 $55.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$165.00
34421 06/03/2022 Open Accounts Payable KIMLEY-HORN AND ASSOCIATES, INC.
$15,487.50
Invoice Date Description Amount
21352075 05/12/2022 De Anza/McClellan/Pacifica Intersection Services through 4/30/22
$15,487.50
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$15,487.50
34422 06/03/2022 Open Accounts Payable MICHAEL BAKER INTERNATIONAL, INC.
$4,740.00
Invoice Date Description Amount
1148494 05/26/2022 CDBG and CDBG-CV consultant 2022/03-04 $4,740.00 user: Vi Tran Pages: 9 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 693
CC 08-16-2022
693 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Paying Fund Cash Account Amount
260 - CDBG 260 100-100 (Cash & Investments Assets Operating Cash)
$4,740.00
34423 06/03/2022 Open Accounts Payable MOSS ADAMS LLP $1,300.00 Invoice Date Description Amount
102307669 05/24/2022 Professional Services - FWA Program Services 4/1/22- 4/30/22
$1,300.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,300.00
34424 06/03/2022 Open Accounts Payable ODP Business Solutions, LLC $111.31 Invoice Date Description Amount
242237636001 05/04/2022 ink cartridges (cyan) for poster printer $30.52 242238689001 05/04/2022 white card stock $21.52
236837873001 04/06/2022 coffee creamer & dry erase supplies $59.27 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$111.31
34425 06/03/2022 Open Accounts Payable OpenGov, Inc $67,188.00 Invoice Date Description Amount
INV00007429 05/26/2022 Budgeting & Planning 07/01/2022-06/30/2023 $67,188.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$67,188.00
34426 06/03/2022 Open Accounts Payable PACIFIC OFFICE AUTOMATION, INC
$2,859.24
Invoice Date Description Amount
174774 05/24/2022 Quarterly Maint. & Support for 15 mfp 2/20-5/20, 2022 $2,859.24 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$2,859.24
34427 06/03/2022 Open Accounts Payable Pakpour Consulting Group, Inc. $4,000.00 Invoice Date Description Amount
3799 05/09/2022 SCB Class IV Bikeway Ph 2 Wolfe to 85 Design, 4/1/22 to 4/30/22
$4,000.00
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$4,000.00
34428 06/03/2022 Open Accounts Payable PROFESSIONAL TURF MANAGEMENT, INC.
$17,000.00
Invoice Date Description Amount
1212 05/20/2022 Golf course monthly maintenance fee $17,000.00 Paying Fund Cash Account Amount
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$17,000.00
34429 06/03/2022 Open Accounts Payable Quench USA, Inc. $334.39 Invoice Date Description Amount
INV04056126 06/01/2022 Service Center 6.1 to 7.31.2022 Water Cooler $82.61 user: Vi Tran Pages: 10 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 694
CC 08-16-2022
694 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
INV04048901 06/01/2022 Water Service, Franco Traffic Ops Center, 6-1-22 to 7/31/22
$82.61
INV04033955 06/01/2022 Water Service, City Hall, 6/1/22 to 7/31/222 $169.17 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$334.39
34430 06/03/2022 Open Accounts Payable RICHARD YAU $6,900.00 Invoice Date Description Amount
2204 05/23/2022 CIP Project Management Services through May 23, 2022
$6,900.00
Paying Fund Cash Account Amount
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$1,500.00
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$5,400.00
34431 06/03/2022 Open Accounts Payable RISE HOUSING SOLUTIONS, INC $19,084.00 Invoice Date Description Amount
Cupertino - 013 05/31/2022 BMR Program Administrator 2022/05 $19,084.00 Paying Fund Cash Account Amount
265 - BMR Housing 265 100-100 (Cash & Investments Assets Operating Cash)
$19,084.00
34432 06/03/2022 Open Accounts Payable RUBY CHEN $320.00 Invoice Date Description Amount
Spring Payment 1 05/24/2022 payment for spring classes $320.00 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$320.00
34433 06/03/2022 Open Accounts Payable Silicon Valley Bicycle Coalition $2,800.00 Invoice Date Description Amount
1512 03/10/2022 Sponsorship of BTWD & Bike Month-May 2022 $2,800.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,800.00
34434 06/03/2022 Open Accounts Payable SKYDIO, INC. $200.00 Invoice Date Description Amount
INV-45285 05/30/2022 Andy - SKYDIO X2E ONLINE TRAINING $200.00 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$200.00
34435 06/03/2022 Open Accounts Payable Staples $572.99
Invoice Date Description Amount
3501980044 03/05/2022 Copy paper for CMO acct #1026769 $178.92 3502246401 03/10/2022 Note pads/pens for Dias - acct #1026769 $50.48 3502452686 03/12/2022 Note pads/Dish soap for CMO - acct 1026769 $66.49 3502749506 03/17/2022 Kleenex / Wipes for CMO - acct 1026769 $88.63 3504575712 04/03/2022 Office supplies for CMO - acct 1026769 $105.75 3507131226 05/04/2022 Note pads / Pens - acct 1026769 $82.72 Paying Fund Cash Account Amount
user: Vi Tran Pages: 11 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 695
CC 08-16-2022
695 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$572.99
34436 06/03/2022 Open Accounts Payable STARBIRD CONSULTING LLC $1,349.41 Invoice Date Description Amount
0180 05/20/2022 SO #1 McClellan Ranch West Habitat Monitor. thru April 30, 2022
$1,349.41
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$1,349.41
34437 06/03/2022 Open Accounts Payable Tenji, Inc. $2,473.55 Invoice Date Description Amount
3676 05/19/2022 Facilities - Library Apr 2022 Aquarium Maint. $2,473.55 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,473.55
34438 06/03/2022 Open Accounts Payable TERRYBERRY COMPANY LLC $485.05 Invoice Date Description Amount
143069-26141 04/30/2022 Employee Recognition-R. Rodriguez $145.09 143069-25651 03/31/2022 Employee Recognition- S. Hatch, B. Howard, J. Lopez $339.96 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$485.05
34439 06/03/2022 Open Accounts Payable The Home Depot Pro $644.30 Invoice Date Description Amount
685378150 05/13/2022 Facilities - Park Bathroom Supplies $644.30 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$644.30
34440 06/03/2022 Open Accounts Payable WEST VALLEY COMMUNITY SVCS AGENCY
$20,200.92
Invoice Date Description Amount
HHQ3FY2122 05/27/2022 Haven to Home Q3 FY21-22 $20,200.92 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$20,200.92
Type EFT Totals: 44 Transactions $913,144.12
Main Account - Main Checking Account Totals
Checks Status Count Transaction Amount Reconciled Amount Open 31 $312,219.71 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 31 $312,219.71 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 44 $913,144.12 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
user: Vi Tran Pages: 12 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 696
CC 08-16-2022
696 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Total 44 $913,144.12 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 75 $1,225,363.83 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 75 $1,225,363.83 $0.00
Grand Totals:

Checks Status Count Transaction Amount Reconciled Amount Open 31 $312,219.71 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 31 $312,219.71 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 44 $913,144.12 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 44 $913,144.12 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 75 $1,225,363.83 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 75 $1,225,363.83 $0.00
user: Vi Tran Pages: 13 of 13 Monday, June 06, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 5/28/2022 - To Payment Date: 6/3/2022 Approved
6/6/2022
697
CC 08-16-2022
697 of 1555
RESOLUTION NO. 22-085

A RESOLUTION OF THE CUPERTINO CITY COUNCIL

RATIFYING CERTAIN CLAIMS AND DEMANDS PAYABLE IN THE

AMOUNTS AND FROM THE FUNDS AS HEREINAFTER DESCRIBED FOR

GENERAL AND MISCELLANEOUS EXPENDITURES FOR THE PERIOD
ENDING JUNE 13, 2022
WHEREAS, the Director of Administrative Services or her designated representative has certified to accuracy of the following claims and demands and to the availability of funds for payment hereof; and
WHEREAS, the said claims and demands have been audited as required by law.

NOW, THEREFORE, BE IT RESOLVED that the City Council does hereby allow the following claims and demands in the amounts and from the funds as hereinafter set forth in the attached Payment Register.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 16th day of August, 2022 by the following vote:

Vote Members of the City Council
AYES:

NOES:

ABSENT:

ABSTAIN:

SIGNED:
________
Darcy Paul, Mayor
City of Cupertino
________________________
Date
ATTEST:
________
Kirsten Squarcia, City Clerk
________________________
Date
698
CC 08-16-2022
698 of 1555
Resolution No. 22-XXX

Page 2 ends

CERTIFICATION
The Administrative Services Director hereby certifies to the accuracy of said records and to the availability of funds for payment.

CERTIFIED:

Kristina Alfaro, Director of Administrative Services
699
CC 08-16-2022
699 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Main Account - Main Checking Account
Check
730382 06/10/2022 Open Accounts Payable AARABI RAJESHWARAN $40.00 Invoice Date Description Amount
Spring Payment 1 06/07/2022 payment for spring classes $40.00 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$40.00
730383 06/10/2022 Open Accounts Payable ADVANTAGE GRAFIX $163.14 Invoice Date Description Amount
46562 04/30/2022 Library Expansion Gala - Programs $163.14 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$163.14
730384 06/10/2022 Open Accounts Payable AMANDA HUI $236.74 Invoice Date Description Amount
06072022 06/07/2022 National Service Training Conference June 1 to 3, 2022, Per Diem
$207.50
06072022_2 06/07/2022 National Service Training Conference June 1-3, Travel Reimburse
$29.24
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$236.74
730385 06/10/2022 Open Accounts Payable Andre Duurvoort $61.78 Invoice Date Description Amount
AndreD052522 05/25/2022 Reimbursement for Earth Day Team Lunch 5/25 $61.78 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$61.78
730386 06/10/2022 Open Accounts Payable Arena LLC $1,500.00 Invoice Date Description Amount
07042022 07/04/2022 2022 4th of July Morning Performance $1,500.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,500.00
730387 06/10/2022 Open Accounts Payable AT&T $698.33
Invoice Date Description Amount
000018176319-0 05/12/2022 4087771305 | | 10185 N STELLING RD - Secure FAX $15.87 000018176319-1 05/12/2022 4087771306 | | 10185 N STELLING RD - Sheriff $15.79 000018176319-2 05/12/2022 4087771307 | | 10185 N STELLING RD - Sheriff $15.79 000018176319-3 05/12/2022 4087771311 | | 22221 MC CLELLAN RD - Environmental Education Cen
$20.86
000018176319-4 05/12/2022 4087771318 | | 10555 MARY AV - BUSY $31.79 000018176319-5 05/12/2022 4087771331 | | 21975 SAN FERNANDO AV - BBFKiosk Alarm$16.29 000018176319-6 05/12/2022 4087771340 | | 10555 MARY AV - Alarm- Service Center
$15.91
000018176319-7 05/12/2022 4087771344 | | 21251 STEVENS CREEK BL - SEN - FAX
$15.79
user: Vi Tran Pages: 1 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 700
CC 08-16-2022
700 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
000018176319-8 05/12/2022 4087771345 - CH- PG&E Meter $15.94 000018176319-9 05/12/2022 4087771346 | | 21111 STEVENS CREEK BL - SPORTS Center - HVAC Lin
$15.94
000018176319-10 05/12/2022 4087771348 | | 10555 MARY AV - Alarm- Service Center
$17.19
000018176319-11 05/12/2022 4087771355 | | 10555 MARY AV - Mechanic Shop FAX
$15.79
000018176319-12 05/12/2022 4087773102 | | 10185 N STELLING RD - Museum/Spare
$15.79
000018176319-13 05/12/2022 4087773103 | | 10185 N STELLING RD - Museum/Spare
$15.79
000018176319-14 05/12/2022 4087773109 - FAX $15.79
000018176319-15 05/12/2022 4087773112 | | 21111 STEVENS CREEK BL - SPORTS- Fire Alarm
$17.34
000018176319-16 05/12/2022 4087773113 | | 21111 STEVENS CREEK BL - SPORTS- Fire Alarm
$16.04
000018176319-17 05/12/2022 4087773137 | | 10185 N STELLING RD - FAX QCC $15.79 000018176319-18 05/12/2022 4087773143 | | 21975 SAN FERNANDO AV - BBF - Retreat Alarm
$16.58
000018176319-19 05/12/2022 4087773145 | | 21975 SAN FERNANDO AV - BBFAlarm Golf Shed$15.94 000018176319-20 05/12/2022 4087773156 | | 21251 STEVENS CREEK BL - SENFAX Work Room$15.79 000018176319-21 05/12/2022 4087773164 | | 21111 STEVENS CREEK BL - Sports Fax
$15.94
000018176319-22 05/12/2022 4087773168 | | 21111 STEVENS CREEK BL - Sports Center Elevator
$15.94
000018176319-23 05/12/2022 4087773254 | | 21975 SAN FERNANDO AV - BBF - Golf Shed
$20.86
000018176319-24 05/12/2022 4087773258 | | 21975 SAN FERNANDO AV - BBF- $ODUP&DIp
$15.79
000018176319-25 05/12/2022 4087773287 - Comm Hall - Alarm $16.91 000018176319-26 05/12/2022 4087773288 - Comm Hall - Fire Alarm $16.33 000018176319-27 05/12/2022 4087773293 - Comm Hall - Fire Alarm $15.79 000018176319-28 05/12/2022 4087773302 | | 21251 STEVENS CREEK BL - SENCredit Card Front D$15.79 000018176319-29 05/12/2022 4087773305 | | 21251 STEVENS CREEK BL - SENCredit Card Front D$15.79 000018176319-30 05/12/2022 4087773317 - CH- Finance CC VISA $15.94 000018176319-31 05/12/2022 4087773333 - CH- FAX downstairs $15.94 000018176319-32 05/12/2022 4087773365 | | 21251 STEVENS CREEK BL - RNA FAX
$15.79
000018176319-33 05/12/2022 4087773369 | | 21251 STEVENS CREEK BL - SENAlarm Line$16.92 000018176319-34 05/12/2022 4087773370 | | 21251 STEVENS CREEK BL - SENAlarm Line$16.01 000018176319-35 05/12/2022 4087773372 | | 21251 STEVENS CREEK BL - Trane Modem (HVAC)
$15.79
000018176319-36 05/12/2022 4087773387 | | 10555 MARY AV - FAX or Alarm $15.79 000018176319-37 05/12/2022 4087773388 | | 10555 MARY AV - FAX or Alarm $15.79 000018176319-38 05/12/2022 4087773399 | | 10555 MARY AV - FAX $16.05 user: Vi Tran Pages: 2 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 701
CC 08-16-2022
701 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
000018176319-39 05/12/2022 4087773401 | | 20410 TOWN CENTER LN - FAX number at City Attorne
$15.79
000018176319-40 05/12/2022 4087773416 | | 21251 STEVENS CREEK BL - SENCr Card$15.79 000018176319-41 05/12/2022 4087773419 | | 21251 STEVENS CREEK BL - SENCr Card$15.79 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$548.75
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$81.20
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$52.59
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$15.79
730388 06/10/2022 Open Accounts Payable Bay Aerials Gymnastics $5,487.60 Invoice Date Description Amount
Spring Payment 2 06/06/2022 payment for spring classes $5,487.60 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$5,487.60
730389 06/10/2022 Open Accounts Payable BILL GARVIN $1,750.00 Invoice Date Description Amount
07072022 07/07/2022 Summer Concert Series - July 7, 2022 $1,750.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,750.00
730390 06/10/2022 Open Accounts Payable BURR PLUMBING AND PUMPING INC
$18,300.74
Invoice Date Description Amount
110330 05/13/2022 Facilities - BBF Installed Bottler Filler $9,750.00 110593 06/03/2022 Facilities - Sports Cnt Clean Out Stoppage Rem Gloves & Hygeine
$305.74
110412 05/26/2022 Facilities - Community Hall Install Bottler Filler $8,245.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$17,995.00
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$305.74
730391 06/10/2022 Open Accounts Payable California Resource Recovery Association (CRRA)
$4,625.00
Invoice Date Description Amount
CUPERTINOREG2022 06/07/2022 2022 Conference Registration- 5 staff $3,625.00 10842 05/16/2022 CRRA membership- 5 staff $1,000.00
Paying Fund Cash Account Amount
520 - Resource Recovery 520 100-100 (Cash & Investments Assets Operating Cash)
$4,625.00
user: Vi Tran Pages: 3 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 702
CC 08-16-2022
702 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
730392 06/10/2022 Open Accounts Payable CAMPBELL UNION SCHOOL

DISTRICT
$5,380.83
Invoice Date Description Amount
220395 05/27/2022 Creek Education Fieldtrip Buses throughout May 2022 $5,380.83 Paying Fund Cash Account Amount
230 - Env Mgmt Cln Crk Strm Drain 230 100-100 (Cash & Investments Assets Operating Cash)
$5,380.83
730393 06/10/2022 Open Accounts Payable COAST COUNTIES TRUCK &

EQUIPMENT CO
$359.30
Invoice Date Description Amount
01156201P 05/24/2022 Fleet - Lube Filter $174.27
01156202P 05/24/2022 Fleet - Coolant Pre Mix 1Gal $185.03 Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$359.30
730394 06/10/2022 Open Accounts Payable COLANTUONO, HIGHSMITH &

WHATLEY, PC
$125.04
Invoice Date Description Amount
50985 03/04/2022 Legal Services, February 2022 $125.04
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$125.04
730395 06/10/2022 Open Accounts Payable Comcast $983.36 Invoice Date Description Amount
146951734 06/01/2022 Business Class Internet - Mary, Stevens May 2022 $983.36 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$983.36
730396 06/10/2022 Open Accounts Payable Community Health Charities of California
$50.00
Invoice Date Description Amount
06032022 06/03/2022 Community Health Charities pp 5/21/22-6/3/22 $50.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$50.00
730397 06/10/2022 Open Accounts Payable Degree HVAC, Inc $550.00 Invoice Date Description Amount
28673 06/02/2022 Facilities - QCC Compressor Lock Out $550.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$550.00
730398 06/10/2022 Open Accounts Payable DEX SYSTEMS ENGINEERING $1,960.00 Invoice Date Description Amount
1553 06/03/2022 CREST Awards setup; Insall audio coverter; troubleshoot monitor
$1,960.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,960.00
user: Vi Tran Pages: 4 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 703
CC 08-16-2022
703 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
730399 06/10/2022 Open Accounts Payable FEDEX $46.91
Invoice Date Description Amount
7-769-15168 05/27/2022 FEDEX Services - IT $46.91
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$46.91
730400 06/10/2022 Open Accounts Payable FOSTER BROS SECURITY

SYSTEMS INC
$1,832.95
Invoice Date Description Amount
1650 05/24/2022 CIP Library Expansion - LFIC Housing, Blocking Ring $1,832.95 Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$1,832.95
730401 06/10/2022 Open Accounts Payable GOT GOPHERS, INC. $925.00 Invoice Date Description Amount
29017 05/31/2022 Grounds - May 2022 Pest Control Various City Parks $925.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$925.00
730402 06/10/2022 Open Accounts Payable Gridics LLC $24,000.00 Invoice Date Description Amount
INV-0428 06/07/2022 ZoneCheck, MuniMap, CodeHub, Support & Maintenance- Year 1
$24,000.00
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$24,000.00
730403 06/10/2022 Open Accounts Payable HOME DEPOT CREDIT SERVICES $7,754.40 Invoice Date Description Amount
4260030 05/03/2022 Facilities - Paul S Hose, Hose w/Shutoff $75.36 9612800 04/28/2022 Grounds - Travis W Gray Sanded Caulk $18.09 9010455 04/28/2022 Grounds - Travis W Sponge, Bucket, Caulk $64.20 8515198 04/29/2022 Grounds - Ralph A Tubing, Valve Box, Stake $160.34 8265150 04/29/2022 Grounds - Travis W Marigold, Dahlia, Plant Box Watering Can
$73.14
9010561 04/28/2022 Grounds - Brandon M Simple Green, Bucket, Voltage Tester
$74.19
9514895 04/28/2022 Facilities - Robert G Shockwave, Wood $57.93 5516212 05/02/2022 Grounds - Robert G, Caulk Gun, Tape, Crack Fix, Hornet Killer
$126.10
3032943 05/04/2022 Streets - Jerry A Grinder w/Paddle Switch $217.66 3032939 05/04/2022 Streets - Jerry A Outlet Kit, Stranded White, Red, Green
$363.26
3032947 05/04/2022 Streets - Jerry A M18 Fuel 1/2 Impact Wrench $272.34 3032948 05/04/2022 Streets - Jerry A M18 Fuel 1/2 Impact Wrench $272.34 2011126 05/05/2022 Streets - John Ramos Folding Knife, Plier Set, Scrwdrvr Set
$227.20
1011142 05/06/2022 Streets - Shawn T Tape, Sprayer, towel, Brush, Disc $689.34 4525473 05/03/2022 Facilities - Robert G Roller, Screen Frame Kit $106.76 4516566 05/03/2022 Facilities - Robert G Screen $22.88
user: Vi Tran Pages: 5 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 704
CC 08-16-2022
704 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
3525713 05/04/2022 Facilities - Robert G Sealant, Brush, Brush, Liners $108.11 2011091 05/05/2022 Grounds - Brandon Morales Wrench Set $167.26 2033099 05/05/2022 Grounds - Brandon Morales Pebbles, Click Set $37.05 2011092 05/05/2022 Grounds - Brandon Morales Mounting Pads $67.59 4010856 05/03/2022 Grounds - Brandon Morales Mech Set, Staples, Splice Connector
$124.48
8518547 05/09/2022 Facilities - Aaron Saiz Hepa Kit, Oil Filter, Batteries $121.06 2615047 05/05/2022 Grounds - Travis W Whipkit, Switch, Cover $40.48 8320465 05/09/2022 Grounds - Bill Bridge PVC Union, Ball Valve $32.79 372737 05/17/2022 Grounds - Aaron Saiz Lumber $147.36
12411 05/17/2022 Grounds - Brandon Morales Hex Set, White Paint Marker
$213.86
8624212 05/09/2022 Facilities - Robert G Screws, Drill $41.51 4011864 05/13/2022 Facilities - Robert G Lumber $67.30
6082561 05/11/2022 Facilities - Domingo S Screw, Sheet Metal, Tie Plate $65.46 5082584 05/12/2022 Facilities - Domingo S Inverter, Paint Pail Opener $194.94 380282 05/17/2022 Grounds - Sean F Caution Tape $218.42 9372754 05/18/2022 Grounds - Paul S Concrete Mix, Socket Set, Wrench Set, Trowel
$274.05
900951 05/17/2022 Grounds - Ty B Dewalt Lithium Ion Power Batt Backpack
$305.16
4012993 05/23/2022 Streets - Jerry A Pliers, Screwdriver Set $144.28 3034325 05/24/2022 Trees/ROW - Ricardo A Gain Flings Odor SWP Vest Washing
$24.36
607146 05/17/2022 Grounds - Travis W Screw, Mountain Pads, Zip Ties $34.28 372736 05/17/2022 Grounds - Aaron S Bucket, Pad, Hex Set, Bit Holder, Socket, Leve
$235.75
8320884 05/19/2022 Trees/ROW - Justice P Irrigation Supplies $306.99 3013083 05/24/2022 Grounds - Brandon Morales Bucket, Latex Brush $118.95 4611057 05/23/2022 Facilities - Robert G Glass Fuse, J-Bend 22 Gauge $64.58 3013044 05/24/2022 Grounds - Victor Espinoza Drill Bit, Bit Set, Shockwave Set
$876.51
2611772 05/25/2022 Grounds - Travis W Reducing Washer $4.24 3013049 05/24/2022 Grounds - Victor Espinoza Expansion $24.94 2611719 05/25/2022 Grounds - Travis W Conduit, Tape, Switch, Strap, Connectors
$508.62
2194356 05/25/2022 Grounds - Credit ($96.14)
2034444 05/25/2022 Streets - Dan Barone Ratchet Tool, Battery, Charger Kit
$287.62
3601764 05/24/2022 Facilities - Domingo S Bevel Washer $171.41 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$6,550.24
230 - Env Mgmt Cln Crk Strm Drain 230 100-100 (Cash & Investments Assets Operating Cash)
$287.62
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$916.54
730404 06/10/2022 Open Accounts Payable INTERSTATE BATTERY SYSTEM SAN JOSE INC.
$388.90
Invoice Date Description Amount
60290361 05/24/2022 Fleet - MT59, MTP65HD $388.90
user: Vi Tran Pages: 6 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 705
CC 08-16-2022
705 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$388.90
730405 06/10/2022 Open Accounts Payable IRON MOUNTAIN $2,421.44 Invoice Date Description Amount
GPTJ241 05/31/2022 City Clerk Office Storage - June 2022 $2,421.44 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,421.44
730406 06/10/2022 Open Accounts Payable Janice Wright $420.00 Invoice Date Description Amount
Spring Payment 1 06/06/2022 payment for spring classes $420.00 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$420.00
730407 06/10/2022 Open Accounts Payable KNORR SYSTEMS $1,170.32 Invoice Date Description Amount
SI239535 05/31/2022 Facilities - BBF Pool Chlorine, Acid, Sodium Bicarbonate
$1,170.32
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,170.32
730408 06/10/2022 Open Accounts Payable LAWSON PRODUCTS INC $153.24 Invoice Date Description Amount
9309533765 05/04/2022 Fleet - Headlamp, Cable Ties, Air Nipple, Lock Washer, Flat Wash
$153.24
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$153.24
730409 06/10/2022 Open Accounts Payable LEHR $1,872.59
Invoice Date Description Amount
SI74079 05/17/2022 Fleet - AE L31 Beacon Title XIII Flat MT Amber $1,872.59 Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$1,872.59
730410 06/10/2022 Open Accounts Payable Li-Fen Lin $960.00 Invoice Date Description Amount
Spring Payment 1 06/06/2022 payment for spring classes $960.00 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$960.00
730411 06/10/2022 Open Accounts Payable MARVIN AGUILAR-ESCOBAR $1,686.52 Invoice Date Description Amount
MarvinA053122 05/31/2022 Reimbursement for CACEO conference - Marvin Aguilar Escobar
$1,686.52
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,686.52
user: Vi Tran Pages: 7 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 706
CC 08-16-2022
706 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
730412 06/10/2022 Open Accounts Payable Mercy & The Heartbeat $2,500.00 Invoice Date Description Amount
06302022 06/30/2022 Summer Concert Series - June 30, 2022 $2,500.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,500.00
730413 06/10/2022 Open Accounts Payable MOUNTAIN VIEW GARDEN CENTER
$565.48
Invoice Date Description Amount
110317 06/02/2022 Grounds - Top Soil 1/2 Yd $23.44
110314 06/02/2022 Grounds - Fill Sand 1Yd $65.42
110216 05/24/2022 Grounds - 3/4 Base Rock $53.42
110224 05/24/2022 Grounds - 3/4 Base Rock CY $53.42
110233 05/25/2022 Grounds - 3/4 Base Rock CY $53.42
110245 05/26/2022 Streets - 3/4 Drain Rock $222.62
110251 05/26/2022 Trees/ROW - 2yd Top Soil $93.74
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$342.86
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$222.62
730414 06/10/2022 Open Accounts Payable NOR CAL SIGNAL SUPPLY LLC $33,928.57 Invoice Date Description Amount
1170-1 06/06/2022 VDC Battery Set $33,928.57
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$33,928.57
730415 06/10/2022 Open Accounts Payable O'REILLY AUTO PARTS $839.81 Invoice Date Description Amount
2591-439884 11/09/2019 Fleet - Credit for Invoice 2591-440463 ($17.43) 2591-452473 01/13/2020 Fleet - Black Shine, 10t Trans Fluid $76.21 2591-457859 02/10/2020 Fleet - 1Gal Brake Fluid, 32oz Brake Fluid $74.49 2591-457864 02/10/2020 Fleet - Credit for Invoice 2591-457859 ($74.49) 2591-457865 02/10/2020 Fleet - 32oz Brake Fluid, 1Gal Brake Fluid $74.49 2591-458555 02/14/2020 Fleet - 5.6oz Butane, Oil Filter $45.75 2591-461307 02/28/2020 Fleet - 1Gal Antifrez $98.05
2591-471078 05/05/2020 Fleet - VLV Remover, Thermometer $36.42 2591-471354 05/07/2020 Fleet - Credit for Invoice 2591-470876 ($39.60) 2591-473163 05/18/2020 Fleet - Credit for Invoice 2591-472611 ($53.12) 2591-487609 08/07/2020 Fleet - Ign Lock Cyl $73.90
2591-488083 08/10/2020 Fleet - ADH Promoter, Etch Primer $32.68 2591-489591 08/18/2020 Fleet - Credit for Invoice 2591-489399 ($0.01) 2591-100363 10/16/2020 Fleet - Credit for Invoice 2591-497766 ($37.80) 2591-107149 11/23/2020 Fleet - Steering Wheel Cover $21.79 2591-111246 12/17/2020 Fleet - Reservoir $254.72
2591-116635 01/20/2021 Fleet - Truflex Belt $6.68
2591-118187 01/29/2021 Fleet - Credit for Invoice 2591-116635 ($6.68) 2591-124143 03/05/2021 Fleet - Credit ($397.61)
2591-131227 04/13/2021 Fleet - Disc Brk Kit $6.82
user: Vi Tran Pages: 8 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 707
CC 08-16-2022
707 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
2591-131413 04/14/2021 Fleet - Drum HDW Kit $9.86
2591-131632 04/15/2021 Fleet - Credit ($226.68)
2591-133746 04/26/2021 Fleet - BlueDEF Drum $261.59
2591-133752 04/26/2021 Fleet - Credit for Invoice 2591-133746 ($261.59) 2591-136017 05/07/2021 Fleet - Credit ($72.29)
2591-136432 05/10/2021 Fleet - Fuel Filter $291.58
2591-142053 06/07/2021 Fleet - Credit ($11.65)
2591-155454 08/11/2021 Fleet - Credit ($30.14)
2591-162938 09/16/2021 Fleet - Credit ($16.18)
2591-172991 11/02/2021 Fleet - A/T Filer $22.32
2591-174448 11/09/2021 Fleet - DEF Pump $357.45
2591-179384 12/03/2021 Fleet - Credit ($21.34)
2591-187394 01/13/2022 Fleet - DEF Pump $361.62
2591-191549 02/05/2022 Fleet - Credit for Invoice 2591-191549 ($92.52) 2591-191546 02/05/2022 Fleet - Pres Sen $92.52
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$839.81
730416 06/10/2022 Open Accounts Payable Operating Engineer #3 $1,484.16 Invoice Date Description Amount
06032022 06/03/2022 Union Dues pp 5/21/22-6/3/22 $1,484.16 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,484.16
730417 06/10/2022 Open Accounts Payable OTIS ELEVATOR COMPANY $13,712.00 Invoice Date Description Amount
SJ29360002 04/18/2022 Facilities - City Hall Retest FLST for SPO, Belts, Oil Hoses,
$13,712.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$13,712.00
730418 06/10/2022 Open Accounts Payable PETERSON TRUCKS, INC $228.90 Invoice Date Description Amount
429731M 06/03/2022 Fleet - ES Compl Allet1 $228.90
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$228.90
730419 06/10/2022 Open Accounts Payable PG&E $104,109.54 Invoice Date Description Amount
Import - 895370 05/02/2022 110659172 -N De Anza 455FT S/O Mariani Dr, Irrig Control
$13.36
Import - 895371 05/02/2022 110958527 115145264 -Randy Lane & Larry WayStreetlights$57.08 Import - 895372 05/02/2022 111736580 SF Cupertino 075 $3.85 Import - 895373 05/02/2022 (Old116367536) 113736756 ESP113428799 -Senior Center 21251 Steve
$3,290.09
Import - 895374 05/02/2022 116367013 -112017763 -11370 S Stelling Rd, Irrigation Control
$16.20
user: Vi Tran Pages: 9 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 708
CC 08-16-2022
708 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Import - 895375 05/02/2022 114315284 116367325 -21975 San Fernando Ave, Picnic Area
$1,861.47
Import - 895376 05/02/2022 114321565 116367416 -22601 Voss Ave $582.03 Import - 895377 05/02/2022 116367001 -E27H4 Wolfe and Rte 280 NB Loc A $57.81 Import - 895378 05/02/2022 116367025 -De Anza and Lazaneo, Traffic Signal $85.26 Import - 895379 05/02/2022 116367035 -De Anza Blvd and Mariani, Traffic Signal/Safety Lts
$105.19
Import - 895380 05/02/2022 116367044 -10555 Mary Ave NEM $658.94 Import - 895381 05/02/2022 116367045 -De Anza Blvd and Hwy 280 S/Ramp, Traffic Signal
$102.34
Import - 895382 05/02/2022 116367050 -NW Corner Stevens Crk, Traffic Signals $86.00 Import - 895383 05/02/2022 116367055 -Saich Wy and Stevens Crk NE Corner, Traffic Signal
$69.73
Import - 895384 05/02/2022 116367060 -E37R0 Stevens Creek and De Anza Blvd, Traffic Signal
$106.04
Import - 895385 05/02/2022 116367065 -Stevens Creek Blvd E/Saich Wy, Sprinkler Control
$10.42
Import - 895386 05/02/2022 116367067 -Stonydale Dr and Varian Park, walkway lighting and Ir
$91.88
Import - 895387 05/02/2022 116367070 -Stevens Creek and Blaney Ave., Traffic Signal
$97.14
Import - 895388 05/02/2022 116367071 -Linda Vista Dr / Hillside Park, Hillside Park $25.39 Import - 895389 05/02/2022 116367075 -Vallco Pkwy and Perimeter Rd., Traffic Signals
$71.50
Import - 895390 05/02/2022 116367090 -Wolfe and Vallco Pkwy, Traffic Signals $102.34 Import - 895391 05/02/2022 116367100 -E37H3 Wolfe and 280 SB Loc B, Traffic Signal
$87.56
Import - 895392 05/02/2022 116367105 -Stevens Crk and Wolfe Rd, Traffic Signals $126.47 Import - 895393 05/02/2022 116367110 -SW Cor Stevens Crk and Portal, Traffic Signal
$87.04
Import - 895394 05/02/2022 116367113 -Miller E/S 100N off Calle De Barcelona $84.46 Import - 895395 05/02/2022 116367115 -Stevens Crk and Perimeter Rd, Traffic Control Signal
$75.65
Import - 895396 05/02/2022 116367120 -Vallco Prky/Tantau Ave, Traffic Signal $95.87 Import - 895397 05/02/2022 116367125 -Stevens Crk and Tantau, Traffic Signals $96.12 Import - 895398 05/02/2022 116367130 -NW Corner Steven Crk and Torre, Traffic Signal
$84.00
Import - 895399 05/02/2022 111190735 119980351-10300 Torre Ave, City Hall $7,139.03 Import - 895400 05/02/2022 116367150 -Homestead and Wolfe Road, Sunnyvale $97.21 Import - 895401 05/02/2022 116367155 -Homestead and Blaney, Cupertino Traffic Signal, Sunny
$67.61
Import - 895402 05/02/2022 116367165 -S/E Wolfe-Pruneridge, Sprinkler Control and Traffic S
$101.62
Import - 895403 05/02/2022 116367170 -Tantau Ave and Tandem D/W, Traffic Signal
$90.21
Import - 895404 05/02/2022 116367171 -10155 Barbara Ln, Irrigation and Scoreboard
$88.88
Import - 895405 05/02/2022 116367175 -S/E Corner Pruneridge and Tantau, Traffic Controller
$81.35
Import - 895406 05/02/2022 116367180 -Finch and Stevens Creek, Traffic Signals $86.57 user: Vi Tran Pages: 10 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 709
CC 08-16-2022
709 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Import - 895407 05/02/2022 116367185 -Wolfe Rd 500 Ft S/O Homestead, City/Sign Lighting
$30.44
Import - 895408 05/02/2022 116367195 -Corner Miller and Phil Ln, Traffic Signal $75.37 Import - 895409 05/02/2022 116367200 -Homestead and De Anza Blvd, Traffic Signal/Dept Pub W
$106.28
Import - 895410 05/02/2022 116367205 -Homestead Rd and Franco Ct, Traffic Signals
$75.13
Import - 895411 05/02/2022 116367215 -N/Ramp De Anza Blvd, Traffic Signal $93.25 Import - 895412 05/02/2022 116367220 -Homestead Rd and Bluejay Rd, Traffic Signals
$79.00
Import - 895413 05/02/2022 118426656 -WS Portal Btw Amhurst-Wheaton , Portal Prk Ltg, Prk L
$206.39
Import - 895414 05/02/2022 116367236 -Stelling Rd Median 450' S/O Stevens Crk, Landscape Ir
$11.90
Import - 895415 05/02/2022 116367245 -Stevens Creek Blvd and Janice Ave, Sprinkler Control
$16.15
Import - 895416 05/02/2022 116367255 -Lucille and Villa De Anza, Sprinkler Control
$278.57
Import - 895417 05/02/2022 116367269 -Cor/Lucille and Randy Ln, Sprinkler System (011095852
$11.56
Import - 895418 05/02/2022 116367274 -1170 Yorkshire Dr. $9.92 Import - 895419 05/02/2022 116367275 -Homestead and Tantau, Cupertino Traffic Signal, Sunny
$99.25
Import - 895420 05/02/2022 116367280 -Stevens Creek Blvd and Fwy 85 East Ramp, Traffic Sign
$83.04
Import - 895421 05/02/2022 116971849 -21111 Stevens Creek Blvd, Sports Center $7,285.19 Import - 895422 05/02/2022 116367290 -Stevens Creek and Mary Ave, Traffic Signals
$86.57
Import - 895423 05/02/2022 116367332 -821 Bubb Rd #B/Building Concession $41.41 Import - 895424 05/02/2022 116367343 112570652 -Foothill Blvd 150' N/O Alpine E/S, Irrigati
$10.10
Import - 895425 05/02/2022 116367357 -N De Anza 188 FT N/Valley Green Dr, Irrig Controller
$16.71
Import - 895426 05/02/2022 116367359 -Homestead and Heron, traffic control svc $66.80 Import - 895427 05/02/2022 115211833 -10300 Anisworth Dr, Ball Park Stevens Creek SV
$10.01
Import - 895428 05/02/2022 116367370 -Stevens Creek Blvd and Fwy 85 West Ramp, Traffic Sign
$14.78
Import - 895429 05/02/2022 110081495 -10710 Stokes Ave, Somerset Park $28.06 Import - 895430 05/02/2022 116367380 -NE Corner Peninsula and Stevens Creek, Traffic Signal
$85.01
Import - 895431 05/02/2022 116367385 -End/Stokes W/Wilson Crt, Sprinkler Control
$11.58
Import - 895432 05/02/2022 116367395 -N/E corner Foothill and Starling Dr, Traffic Signals
$69.73
Import - 895433 05/02/2022 116367401 -Miller W/S N of Greenwood $18.67 Import - 895434 05/02/2022 116367408 -Stevens Creek Bl and Mary Avenue, Memorial Park Pump
$65.33
Import - 895435 05/02/2022 116367437 -10455 Miller Ave, Creekside Park $368.41 Import - 895436 05/02/2022 116367447 -Stelling Rd Median 500' S/O Peppertree Ln, Landscape
$12.21
Import - 895437 05/02/2022 116367449 -10350 Torre Ave, Community Hall $2,369.33 user: Vi Tran Pages: 11 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 710
CC 08-16-2022
710 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Import - 895438 05/02/2022 116367455 -E37R9 Rodriguez and De Anza Blvd, Traffic Signal
$90.21
Import - 895439 05/02/2022 116367465 -De Anza Blvd and Scofield Dr, Sprinkler Controller
$11.29
Import - 895440 05/02/2022 116367474 -10500 Ann Arbor Ave, Field-Garden Gate $24.03 Import - 895441 05/02/2022 116367475 -Foothill and Stevens Creek, Traffic Signal $77.76 Import - 895442 05/02/2022 116367476 -Salem Ave and Foothill Blvd, Irrigation Control
$3.59
Import - 895443 05/02/2022 116367477 -21121 Stevens Creek Blvd, Memorial Park $1,590.75 Import - 895444 05/02/2022 116367484 -20220 Suisun Dr, Parks and Rec Free Standing Panel
$70.55
Import - 895445 05/02/2022 116367493 -Dumas Dr/Jollyman Park, Jollyman Park Restroom
$404.59
Import - 895446 05/02/2022 116367505 -Stevens Crk and Stelling, Signal $43.28 Import - 895447 05/02/2022 116367510 -Bubb Rd and Results Wy, Traffic Signal $62.48 Import - 895448 05/02/2022 116367515 -Bubb Rd and McClellan Intersection, Traffic Signal
$93.07
Import - 895449 05/02/2022 116367520 -Stelling Rd and Peppertree, Traffic Signal $70.01 Import - 895450 05/02/2022 116367525 -Stelling and McClellan, Signals $95.64 Import - 895451 05/02/2022 116367527 -Foothill Blvd 200' N/O Stevens Creek W/S, Irrigation
$3.61
Import - 895452 05/02/2022 116367530 -Orange Ave and Stevens Creek N/E corner, Traffic Cont
$56.24
Import - 895453 05/02/2022 116367545 -Saratoga-Sunnyvale Rd, Traffic Signal $79.84 Import - 895454 05/02/2022 116367550 -W/S Saratoga-Sunnyvale Rd @ RT85, Traffic Signal
$70.75
Import - 895455 05/02/2022 116367559 -21011 Prospect Rd, Irrigation Control $9.88 Import - 895456 05/02/2022 116367560 -S/E corner De Anza and Pacifica, Traffic Signal
$86.05
Import - 895457 05/02/2022 116367570 -De Anza Blvd, Sprinkler Controller * $11.29 Import - 895458 05/02/2022 116367585 -Rainbow and Stelling, Traffic Signal $80.63 Import - 895459 05/02/2022 116367587 -10430 S De Anza Blvd, Holiday Lighting $40.74 Import - 895460 05/02/2022 116367590 -Saratoga Sunnyvale Rd and Hwy 85, Traffic Signal
$73.28
Import - 895461 05/02/2022 116367605 -E37C1 Prospect and Rte 85, Traffic Signal $87.24 Import - 895462 05/02/2022 116367610 -E37R6 Kentwood/S. De Anza Blvd, Traffic Signal
$83.29
Import - 895463 05/02/2022 116367615 -Fallenleaf Ln and S De Anza Blvd, Traffic Signal
$85.14
Import - 895464 05/02/2022 116367620 -S De Anza Blvd and Sharon Dr , Irrigation Controller
$16.84
Import - 895465 05/02/2022 116367625 -Stevens Creek Blvd Orange S/W Cor, Irrigation Control
$3.57
Import - 895466 05/02/2022 116367628 -N/W corner Alpine Dr and Foothill Blvd, Irrigation Co
$10.03
Import - 895467 05/02/2022 116367630 -22100 Stevens Creek Blvd, Golf Pro Shop $262.31 Import - 895468 05/02/2022 116367648 -Linda Vista Park/Linda Vista Dr, Irrigation Control
$151.40
Import - 895469 05/02/2022 116367656 -Scofield and De Anza, 100HP $12.07 Import - 895470 05/02/2022 116367677 -De Anza and Lazaneo, Sprinkler System $10.21 user: Vi Tran Pages: 12 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 711
CC 08-16-2022
711 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Import - 895471 05/02/2022 116367685 -Ruppell Pl and Moltzen Dr, Sprinkler Control
$106.00
Import - 895472 05/02/2022 116367740 -Carmen Rd and Stevens Creek S/E corner, Irrigation Co
$3.57
Import - 895473 05/02/2022 116367044 -10555 Mary Ave, Corp Yard $515.78 Import - 895474 05/02/2022 116367763 -10630 S De Anza Blvd, Holiday Lighting $42.95 Import - 895475 05/02/2022 116367782 -N/S Stevens Creek Blvd in front of 20301, Irrigation
$9.86
Import - 895476 05/02/2022 116367793 -101 Skyport Dr, DG A, San Jose, PGandE-Owned St/Highw
$731.54
Import - 895477 05/02/2022 116367815 -19784 Wintergreen Dr $552.86 Import - 895478 05/02/2022 116367836 -De Anza Blvd E/S S/O Lazaneo, Sprinkler Control
$9.95
Import - 895479 05/02/2022 116367840 -10185 N Stelling RD $8,144.17 Import - 895480 05/02/2022 116367902 -10246 Parkside Ln, Wilson Pk Sprinklers,Snack Shack,I
$338.19
Import - 895481 05/02/2022 116367907 -S/W Corner Stelling and Green leaf, Traffic Signal
$80.63
Import - 895482 05/02/2022 116367925 -22601 Voss Ave, Outdoor Lighting-MV Park
$13.87
Import - 895483 05/02/2022 116367941 -7548 Donegal Dr, Irrigation Control /Hoover Park
$9.88
Import - 895484 05/02/2022 116367988 -21710 McClellan Rd, Playground Reception Area
$9.86
Import - 895485 05/02/2022 1110161867 - Wolfe Rd @ Apple Campus Driveway $69.33 Import - 895486 05/02/2022 116644889 19500 Pruneridge ave pole TP16660 $6.34 3296-060122 06/01/2022 5116972329-6 4/25/22-5/23/22 $20,620.91 Import - 896150 06/01/2022 110659172 -N De Anza 455FT S/O Mariani Dr, Irrig Control
$12.93
Import - 896151 06/01/2022 110958527 115145264 -Randy Lane & Larry WayStreetlights$57.00 Import - 896152 06/01/2022 111736580 SF Cupertino 075 $2.21 Import - 896153 06/01/2022 (Old116367536) 113736756 ESP113428799 -Senior Center 21251 Steve
$3,563.01
Import - 896154 06/01/2022 116367013 -112017763 -11370 S Stelling Rd, Irrigation Control
$15.87
Import - 896155 06/01/2022 114315284 116367325 -21975 San Fernando Ave, Picnic Area
$2,157.45
Import - 896156 06/01/2022 114321565 116367416 -22601 Voss Ave $574.15 Import - 896157 06/01/2022 116367001 -E27H4 Wolfe and Rte 280 NB Loc A $55.75 Import - 896158 06/01/2022 116367025 -De Anza and Lazaneo, Traffic Signal $82.47 Import - 896159 06/01/2022 116367035 -De Anza Blvd and Mariani, Traffic Signal/Safety Lts
$95.68
Import - 896160 06/01/2022 116367044 -10555 Mary Ave NEM $64.14 Import - 896161 06/01/2022 116367045 -De Anza Blvd and Hwy 280 S/Ramp, Traffic Signal
$92.58
Import - 896162 06/01/2022 116367050 -NW Corner Stevens Crk, Traffic Signals $78.55 Import - 896163 06/01/2022 116367055 -Saich Wy and Stevens Crk NE Corner, Traffic Signal
$67.69
Import - 896164 06/01/2022 116367060 -E37R0 Stevens Creek and De Anza Blvd, Traffic Signal
$102.69
user: Vi Tran Pages: 13 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 712
CC 08-16-2022
712 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Import - 896165 06/01/2022 116367065 -Stevens Creek Blvd E/Saich Wy, Sprinkler Control
$10.18
Import - 896166 06/01/2022 116367067 -Stonydale Dr and Varian Park, walkway lighting and Ir
$86.33
Import - 896167 06/01/2022 116367070 -Stevens Creek and Blaney Ave., Traffic Signal
$88.42
Import - 896168 06/01/2022 116367071 -Linda Vista Dr / Hillside Park, Hillside Park $24.55 Import - 896169 06/01/2022 116367075 -Vallco Pkwy and Perimeter Rd., Traffic Signals
$64.30
Import - 896170 06/01/2022 116367090 -Wolfe and Vallco Pkwy, Traffic Signals $92.30 Import - 896171 06/01/2022 116367100 -E37H3 Wolfe and 280 SB Loc B, Traffic Signal
$76.99
Import - 896172 06/01/2022 116367105 -Stevens Crk and Wolfe Rd, Traffic Signals $119.79 Import - 896173 06/01/2022 116367110 -SW Cor Stevens Crk and Portal, Traffic Signal
$79.61
Import - 896174 06/01/2022 116367113 -Miller E/S 100N off Calle De Barcelona $77.29 Import - 896175 06/01/2022 116367115 -Stevens Crk and Perimeter Rd, Traffic Control Signal
$68.97
Import - 896176 06/01/2022 116367120 -Vallco Prky/Tantau Ave, Traffic Signal $87.64 Import - 896177 06/01/2022 116367125 -Stevens Crk and Tantau, Traffic Signals $87.38 Import - 896178 06/01/2022 116367130 -NW Corner Steven Crk and Torre, Traffic Signal
$80.64
Import - 896179 06/01/2022 111190735 119980351-10300 Torre Ave, City Hall $7,209.17 Import - 896180 06/01/2022 116367150 -Homestead and Wolfe Road, Sunnyvale $94.13 Import - 896181 06/01/2022 116367155 -Homestead and Blaney, Cupertino Traffic Signal, Sunny
$61.71
Import - 896182 06/01/2022 116367165 -S/E Wolfe-Pruneridge, Sprinkler Control and Traffic S
$99.32
Import - 896183 06/01/2022 116367170 -Tantau Ave and Tandem D/W, Traffic Signal
$87.62
Import - 896184 06/01/2022 116367171 -10155 Barbara Ln, Irrigation and Scoreboard
$109.38
Import - 896185 06/01/2022 116367175 -S/E Corner Pruneridge and Tantau, Traffic Controller
$73.65
Import - 896186 06/01/2022 116367180 -Finch and Stevens Creek, Traffic Signals $84.54 Import - 896187 06/01/2022 116367185 -Wolfe Rd 500 Ft S/O Homestead, City/Sign Lighting
$32.91
Import - 896188 06/01/2022 116367195 -Corner Miller and Phil Ln, Traffic Signal $68.97 Import - 896189 06/01/2022 116367200 -Homestead and De Anza Blvd, Traffic Signal/Dept Pub W
$103.71
Import - 896190 06/01/2022 116367205 -Homestead Rd and Franco Ct, Traffic Signals
$68.72
Import - 896191 06/01/2022 116367215 -N/Ramp De Anza Blvd, Traffic Signal $85.28 Import - 896192 06/01/2022 116367220 -Homestead Rd and Bluejay Rd, Traffic Signals
$71.58
Import - 896193 06/01/2022 118426656 -WS Portal Btw Amhurst-Wheaton , Portal Prk Ltg, Prk L
$185.04
Import - 896194 06/01/2022 116367236 -Stelling Rd Median 450' S/O Stevens Crk, Landscape Ir
$11.62
Import - 896195 06/01/2022 116367245 -Stevens Creek Blvd and Janice Ave, Sprinkler Control
$16.67
user: Vi Tran Pages: 14 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 713
CC 08-16-2022
713 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Import - 896196 06/01/2022 116367255 -Lucille and Villa De Anza, Sprinkler Control
$314.88
Import - 896197 06/01/2022 116367269 -Cor/Lucille and Randy Ln, Sprinkler System (011095852
$11.18
Import - 896198 06/01/2022 116367274 -1170 Yorkshire Dr. $9.70 Import - 896199 06/01/2022 116367275 -Homestead and Tantau, Cupertino Traffic Signal, Sunny
$89.45
Import - 896200 06/01/2022 116367280 -Stevens Creek Blvd and Fwy 85 East Ramp, Traffic Sign
$87.86
Import - 896201 06/01/2022 116971849 -21111 Stevens Creek Blvd, Sports Center $7,081.03 Import - 896202 06/01/2022 116367290 -Stevens Creek and Mary Ave, Traffic Signals
$90.44
Import - 896203 06/01/2022 116367332 -821 Bubb Rd #B/Building Concession $39.39 Import - 896204 06/01/2022 116367343 112570652 -Foothill Blvd 150' N/O Alpine E/S, Irrigati
$9.76
Import - 896205 06/01/2022 116367357 -N De Anza 188 FT N/Valley Green Dr, Irrig Controller
$16.18
Import - 896206 06/01/2022 116367359 -Homestead and Heron, traffic control svc $65.96 Import - 896207 06/01/2022 115211833 -10300 Anisworth Dr, Ball Park Stevens Creek SV
$9.68
Import - 896208 06/01/2022 116367370 -Stevens Creek Blvd and Fwy 85 West Ramp, Traffic Sign
$14.29
Import - 896209 06/01/2022 110081495 -10710 Stokes Ave, Somerset Park $33.17 Import - 896210 06/01/2022 116367380 -NE Corner Peninsula and Stevens Creek, Traffic Signal
$87.87
Import - 896211 06/01/2022 116367385 -End/Stokes W/Wilson Crt, Sprinkler Control
$11.48
Import - 896212 06/01/2022 116367395 -N/E corner Foothill and Starling Dr, Traffic Signals
$67.70
Import - 896213 06/01/2022 116367401 -Miller W/S N of Greenwood $18.15 Import - 896214 06/01/2022 116367408 -Stevens Creek Bl and Mary Avenue, Memorial Park Pump
$62.97
Import - 896215 06/01/2022 116367437 -10455 Miller Ave, Creekside Park $353.63 Import - 896216 06/01/2022 116367447 -Stelling Rd Median 500' S/O Peppertree Ln, Landscape
$11.77
Import - 896217 06/01/2022 116367449 -10350 Torre Ave, Community Hall $2,366.65 Import - 896218 06/01/2022 116367455 -E37R9 Rodriguez and De Anza Blvd, Traffic Signal
$90.98
Import - 896219 06/01/2022 116367465 -De Anza Blvd and Scofield Dr, Sprinkler Controller
$11.17
Import - 896220 06/01/2022 116367474 -10500 Ann Arbor Ave, Field-Garden Gate $31.43 Import - 896221 06/01/2022 116367475 -Foothill and Stevens Creek, Traffic Signal $75.49 Import - 896222 06/01/2022 116367476 -Salem Ave and Foothill Blvd, Irrigation Control
$9.55
Import - 896223 06/01/2022 116367477 -21121 Stevens Creek Blvd, Memorial Park $1,457.27 Import - 896224 06/01/2022 116367484 -20220 Suisun Dr, Parks and Rec Free Standing Panel
$93.92
Import - 896225 06/01/2022 116367493 -Dumas Dr/Jollyman Park, Jollyman Park Restroom
$513.80
Import - 896226 06/01/2022 116367505 -Stevens Crk and Stelling, Signal $41.74 Import - 896227 06/01/2022 116367510 -Bubb Rd and Results Wy, Traffic Signal $60.68 user: Vi Tran Pages: 15 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 714
CC 08-16-2022
714 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Import - 896228 06/01/2022 116367515 -Bubb Rd and McClellan Intersection, Traffic Signal
$90.25
Import - 896229 06/01/2022 116367520 -Stelling Rd and Peppertree, Traffic Signal $67.42 Import - 896230 06/01/2022 116367525 -Stelling and McClellan, Signals $92.81 Import - 896231 06/01/2022 116367527 -Foothill Blvd 200' N/O Stevens Creek W/S, Irrigation
$9.57
Import - 896232 06/01/2022 116367530 -Orange Ave and Stevens Creek N/E corner, Traffic Cont
$58.28
Import - 896233 06/01/2022 116367545 -Saratoga-Sunnyvale Rd, Traffic Signal $77.29 Import - 896234 06/01/2022 116367550 -W/S Saratoga-Sunnyvale Rd @ RT85, Traffic Signal
$69.60
Import - 896235 06/01/2022 116367559 -21011 Prospect Rd, Irrigation Control $9.56 Import - 896236 06/01/2022 116367560 -S/E corner De Anza and Pacifica, Traffic Signal
$83.76
Import - 896237 06/01/2022 116367570 -De Anza Blvd, Sprinkler Controller * $11.17 Import - 896238 06/01/2022 116367585 -Rainbow and Stelling, Traffic Signal $83.68 Import - 896239 06/01/2022 116367587 -10430 S De Anza Blvd, Holiday Lighting $39.96 Import - 896240 06/01/2022 116367590 -Saratoga Sunnyvale Rd and Hwy 85, Traffic Signal
$70.94
Import - 896241 06/01/2022 116367605 -E37C1 Prospect and Rte 85, Traffic Signal $90.37 Import - 896242 06/01/2022 116367610 -E37R6 Kentwood/S. De Anza Blvd, Traffic Signal
$86.42
Import - 896243 06/01/2022 116367615 -Fallenleaf Ln and S De Anza Blvd, Traffic Signal
$82.56
Import - 896244 06/01/2022 116367620 -S De Anza Blvd and Sharon Dr , Irrigation Controller
$17.49
Import - 896245 06/01/2022 116367625 -Stevens Creek Blvd Orange S/W Cor, Irrigation Control
$9.53
Import - 896246 06/01/2022 116367628 -N/W corner Alpine Dr and Foothill Blvd, Irrigation Co
$9.74
Import - 896247 06/01/2022 116367630 -22100 Stevens Creek Blvd, Golf Pro Shop $234.88 Import - 896248 06/01/2022 116367648 -Linda Vista Park/Linda Vista Dr, Irrigation Control
$136.85
Import - 896249 06/01/2022 116367656 -Scofield and De Anza, 100HP $11.69 Import - 896250 06/01/2022 116367677 -De Anza and Lazaneo, Sprinkler System $9.64 Import - 896251 06/01/2022 116367685 -Ruppell Pl and Moltzen Dr, Sprinkler Control
$102.57
Import - 896252 06/01/2022 116367740 -Carmen Rd and Stevens Creek S/E corner, Irrigation Co
$9.53
Import - 896254 06/01/2022 116367763 -10630 S De Anza Blvd, Holiday Lighting $40.94 Import - 896255 06/01/2022 116367782 -N/S Stevens Creek Blvd in front of 20301, Irrigation
$9.53
Import - 896256 06/01/2022 116367793 -101 Skyport Dr, DG A, San Jose, PGandE-Owned St/Highw
$731.40
Import - 896257 06/01/2022 116367815 -19784 Wintergreen Dr $514.41 Import - 896258 06/01/2022 116367836 -De Anza Blvd E/S S/O Lazaneo, Sprinkler Control
$9.65
Import - 896259 06/01/2022 116367840 -10185 N Stelling RD $8,108.45 Import - 896260 06/01/2022 116367902 -10246 Parkside Ln, Wilson Pk Sprinklers,Snack Shack,I
$309.42
user: Vi Tran Pages: 16 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 715
CC 08-16-2022
715 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Import - 896261 06/01/2022 116367907 -S/W Corner Stelling and Green leaf, Traffic Signal
$78.32
Import - 896262 06/01/2022 116367925 -22601 Voss Ave, Outdoor Lighting-MV Park
$20.57
Import - 896263 06/01/2022 116367941 -7548 Donegal Dr, Irrigation Control /Hoover Park
$9.59
Import - 896264 06/01/2022 116367988 -21710 McClellan Rd, Playground Reception Area
$9.53
Import - 896265 06/01/2022 1110161867 - Wolfe Rd @ Apple Campus Driveway $68.82 Import - 896266 06/01/2022 116644889 19500 Pruneridge ave pole TP16660 $6.34 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$89,246.13
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$497.19
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$14,366.22
730420 06/10/2022 Open Accounts Payable PINE CONE LUMBER CO $1,298.56 Invoice Date Description Amount
148334 05/25/2022 Streets - 4x12 8" Pressure Treated Cordova Retaining Wall Work
$1,298.56
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$1,298.56
730421 06/10/2022 Open Accounts Payable QUALITY SPORTS, INC. $449.77 Invoice Date Description Amount
24070 06/02/2022 FLEX ULTRA CABRETTA GLOVE MENS & LADIES $449.77 Paying Fund Cash Account Amount
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$449.77
730422 06/10/2022 Open Accounts Payable REBECCA MCCORMICK $661.45 Invoice Date Description Amount
Spring Payment 1 06/07/2022 payment for spring classes $661.45 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$661.45
730423 06/10/2022 Open Accounts Payable REED & GRAHAM INC $287.79 Invoice Date Description Amount
028640 05/12/2022 Grounds - Asphalt 1/2 Fine $287.79
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$287.79
730424 06/10/2022 Open Accounts Payable ROYAL BRASS INC $32.42 Invoice Date Description Amount
985583-001 06/07/2022 Fleet - Straight Thread $32.42
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$32.42
user: Vi Tran Pages: 17 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 716
CC 08-16-2022
716 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
730425 06/10/2022 Open Accounts Payable RPM EXTERMINATORS INC $3,525.00 Invoice Date Description Amount
0094836 05/09/2022 Facilities - Service Center May 2022 Pest Control $375.00 0094835 05/09/2022 Facilities - Service Center Birds $2,100.00 0093745 04/27/2022 Facilities - April 2022 Rodent Services $1,050.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,353.28
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$171.72
730426 06/10/2022 Open Accounts Payable Scott Michael McClung $1,500.00 Invoice Date Description Amount
06162022 06/16/2022 Summer Concert Series - June 16, 2022 $1,500.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,500.00
730427 06/10/2022 Open Accounts Payable SRIXON / Cleveland Golf / XXIO $198.36 Invoice Date Description Amount
6970726 SO 05/24/2022 Ball: Soft Feel 12 Brite Red $198.36 Paying Fund Cash Account Amount
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$198.36
730428 06/10/2022 Open Accounts Payable STATCOMM INC. $18,348.75 Invoice Date Description Amount
J000530-REV 12/31/2021 5-year Fire Alarm Test and Inspections $18,348.75 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$18,348.75
730429 06/10/2022 Open Accounts Payable State of California-Department of Consumer Affair
$180.00
Invoice Date Description Amount
2022-00000743 06/06/2022 Engineer License Renewal for Chad Mosley $180.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$180.00
730430 06/10/2022 Open Accounts Payable SUNSHINE UNLIMITED $3,565.80 Invoice Date Description Amount
Spring Payment 2 06/06/2022 payment for spring classes $3,565.80 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$3,565.80
730431 06/10/2022 Open Accounts Payable SWATI SAVALE $877.50 Invoice Date Description Amount
Spring Payment 1 06/06/2022 payment for spring classes $877.50 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$877.50
user: Vi Tran Pages: 18 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 717
CC 08-16-2022
717 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
730432 06/10/2022 Open Accounts Payable SYSCO - SAN FRANCISCO $1,014.50 Invoice Date Description Amount
550001873 05/25/2022 coffee supplies and supplies for Bday Bash $1,014.50 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,014.50
730433 06/10/2022 Open Accounts Payable The Cupertino Historical Society, Inc. $1,000.00 Invoice Date Description Amount
161 05/23/2022 Angel Island Trip Sponsorship $1,000.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,000.00
730434 06/10/2022 Open Accounts Payable TPX COMMUNICATIONS $2,123.78 Invoice Date Description Amount
157321926-0 05/31/2022 Telephone Service for new VoIP System May 2022 $2,123.78 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$2,123.78
730435 06/10/2022 Open Accounts Payable TransUnion Risk and Alternative $160.00 Invoice Date Description Amount
6110432-202205-1 06/01/2022 Tlo 05/01/2022 - 05/31/2022 $160.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$160.00
730436 06/10/2022 Open Accounts Payable Urban Futures, Inc. $2,181.00 Invoice Date Description Amount
CD-2021-027 06/06/2022 FY 2021- Continuing Disclosure and Compliance Services
$2,181.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,181.00
730437 06/10/2022 Open Accounts Payable WESTERN ALLIED MECHANICAL, INC.
$24,577.01
Invoice Date Description Amount
11959123 02/28/2022 City Hall HVAC Repairs 2.14.2022 to 3.9.2022 $11,217.01 12400095 04/21/2022 City Hall HVAC Repairs 2.14.2022 to 3.9.2022 $8,184.00 12400661 04/21/2022 City Hall HVAC Repairs 2.14.2022 to 3.9.2022 $5,176.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$24,577.01
730438 06/10/2022 Open Accounts Payable William Lee Vance $1,750.00 Invoice Date Description Amount
07142022 07/14/2022 Summer Concert Series - July 14, 2022 $1,750.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,750.00
user: Vi Tran Pages: 19 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 718
CC 08-16-2022
718 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
730439 06/10/2022 Open Accounts Payable BSA Troop 688 $300.00 Invoice Date Description Amount
2005802.030 05/25/2022 QCC- 2.07.22- Social Room Security Deposit $300.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$300.00
730440 06/10/2022 Open Accounts Payable Chen, Benjamin $35.00 Invoice Date Description Amount
Chen052322 05/23/2022 Live Scan and Fingerprinting Reimbursement $35.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$35.00
730441 06/10/2022 Open Accounts Payable CHS Band Boosters $500.00 Invoice Date Description Amount
2005857.030 06/01/2022 QCC- 5.27.22- Cupertino Room Security Deposit $500.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$500.00
730442 06/10/2022 Open Accounts Payable Cupertino Rotary Club $15.00 Invoice Date Description Amount
2005858.030 06/01/2022 QCC- 7.27.22- Conference Room Cancellation $15.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$15.00
730443 06/10/2022 Open Accounts Payable Cupertino Rotary Club $15.00 Invoice Date Description Amount
2005859.030 06/01/2022 QCC- 7.27.22- Conference Room Cancellation $15.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$15.00
730444 06/10/2022 Open Accounts Payable Dee, Maria $500.00 Invoice Date Description Amount
2005807.030 05/25/2022 QCC- 5.21.22- Cupertino Room Security Deposit $500.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$500.00
730445 06/10/2022 Open Accounts Payable Department of Tax and Collections $551.00 Invoice Date Description Amount
Chang060722 06/07/2022 Jennifer Yuencheng Chang Case# C1899743 for Victim Restitution
$551.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$551.00
730446 06/10/2022 Open Accounts Payable KOMOV, VIATCHESLAV $1,040.00 Invoice Date Description Amount
BS000001731 06/07/2022 10612 Flora Vista, Refundable Deposit, BS000001731 $1,040.00 Paying Fund Cash Account Amount
user: Vi Tran Pages: 20 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 719
CC 08-16-2022
719 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,040.00
730447 06/10/2022 Open Accounts Payable Lin, Yuan $499.60 Invoice Date Description Amount
2022-00000745 06/06/2022 51 Boba Teas, Krispy Kreme, Truedan Cupertino High School
$499.60
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$499.60
730448 06/10/2022 Open Accounts Payable LU, BIN $5,000.00 Invoice Date Description Amount
BS000002649 06/07/2022 10266 Mann Dr., Refundable Deposit, BS000002649 $5,000.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$5,000.00
730449 06/10/2022 Open Accounts Payable Mark, David $720.00 Invoice Date Description Amount
051722 05/17/2022 camp refund, family hardship $720.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$720.00
730450 06/10/2022 Open Accounts Payable Radle, Nathan $20.00 Invoice Date Description Amount
Radle052722 05/27/2022 Live Scan and Fingerprinting Reimbursement $20.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$20.00
730451 06/10/2022 Open Accounts Payable Villa Montessori Inc. $500.00 Invoice Date Description Amount
2005803.030 05/25/2022 QCC- 5.19.22- Cupertino Room Security Deposit $500.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$500.00
730452 06/10/2022 Open Accounts Payable XU, XIAOPENG $500.00 Invoice Date Description Amount
BS000026653 06/08/2022 20220 Patric Ct, Refundable deposit, BS000026653 $500.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$500.00
Type Check Totals: 71 Transactions $317,199.88
EFT
34441 06/06/2022 Open Accounts Payable SQUARE, INC. $105.00 Invoice Date Description Amount
SQUARE060222 06/02/2022 Square Team Plus 6/1/22-7/1/22 $105.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$105.00
user: Vi Tran Pages: 21 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 720
CC 08-16-2022
720 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
34442 06/09/2022 Open Accounts Payable California Public Employees' Retirement System
$388,633.13
Invoice Date Description Amount
7158-051622 05/16/2022 Health Premiums PERS $388,633.13 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$274,147.45
642 - Retiree Medical 642 100-100 (Cash & Investments Assets Operating Cash)
$114,485.68
34443 06/10/2022 Open Accounts Payable Colonial Life & Accident Insurance $29.16 Invoice Date Description Amount
06032022 06/03/2022 Colonial Products pp 5/21/22-6/3/22 $29.16 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$29.16
34444 06/10/2022 Open Accounts Payable Employment Development $9,848.78 Invoice Date Description Amount
06032022 06/03/2022 State Disability Insurance pp 5/21/22-6/3/22 $9,848.78 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$9,848.78
34445 06/10/2022 Open Accounts Payable National Deferred (ROTH) $3,988.93 Invoice Date Description Amount
06032022 06/03/2022 Nationwide Roth pp 5/21/22-6/3/22 $3,988.93 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,988.93
34446 06/10/2022 Open Accounts Payable National Deferred Compensatin $25,207.57 Invoice Date Description Amount
06032022 06/03/2022 Nationwide Deferred Compensation pp 5/21/22-6/3/22 $25,207.57 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$25,207.57
34447 06/10/2022 Open Accounts Payable PERS-457K $12,296.50 Invoice Date Description Amount
06032022 06/03/2022 PERS Deferred Comp pp 5/21/22-6/3/22 $12,296.50 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$12,296.50
34448 06/10/2022 Open Accounts Payable State Disbursement Unit $231.23 Invoice Date Description Amount
06032022 06/03/2022 Child Support pp 5/21/22-6/3/22 $231.23 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$231.23
user: Vi Tran Pages: 22 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 721
CC 08-16-2022
721 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
34449 06/10/2022 Open Accounts Payable 4LEAF, INC. $6,643.00 Invoice Date Description Amount
J3872-01A 06/03/2022 SO #1 Orange Ave SW Improv, services thru 5/31/2022
$6,643.00
Paying Fund Cash Account Amount
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$6,643.00
34450 06/10/2022 Open Accounts Payable Adapt Consulting, Inc. $425.05 Invoice Date Description Amount
23400B 03/30/2022 Boba straws for giveaway items $425.05 Paying Fund Cash Account Amount
520 - Resource Recovery 520 100-100 (Cash & Investments Assets Operating Cash)
$425.05
34451 06/10/2022 Open Accounts Payable Amazon Capital Services $57.20 Invoice Date Description Amount
1CTV-VCQ3-GKLJ 06/06/2022 Hinged Wall Mount Patch Panel Bracket & Cat6 Patch Panel
$57.20
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$57.20
34452 06/10/2022 Open Accounts Payable Amazon Web Services, Inc. $2,268.89 Invoice Date Description Amount
1043616965 06/02/2022 AWS - May 1 - May 31 , 2022 Applications $1,417.19 1044785909 06/02/2022 AWS - May 1 - May 31, 2022 GIS $851.70 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,417.19
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$851.70
34453 06/10/2022 Open Accounts Payable BATTERY SYSTEMS INC. $592.94 Invoice Date Description Amount
7657541 05/27/2022 Fleet - EXP10S-FA, M-Cores $52.77
7516974 04/04/2022 Fleet - 48V Utility 8x6V Kit $540.17 Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$592.94
34454 06/10/2022 Open Accounts Payable BKF ENGINEERS $8,425.25 Invoice Date Description Amount
22060371 06/02/2022 I-280 Trail (formerly JST) Services from 4/25/22- 5/22/22
$8,425.25
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$8,425.25
34455 06/10/2022 Open Accounts Payable Boucher Law, PC $6,975.00 Invoice Date Description Amount
1023 06/02/2022 2022 Finance Manager Recruitment - Phase II $6,975.00 Paying Fund Cash Account Amount
user: Vi Tran Pages: 23 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 722
CC 08-16-2022
722 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$6,975.00
34456 06/10/2022 Open Accounts Payable CHAD E MOSLEY $605.00 Invoice Date Description Amount
ChadM07202021 07/20/2021 Cell Phone Reimbursement through 062121-072021 $55.00 ChadM08202021 08/20/2021 Cell Phone Reimbursement through 08202021 $55.00 ChadM09202021 09/20/2021 Cell Phone Reimbursement through 082121-092021 $55.00 ChadM10202021 10/20/2021 Cell Phone Reimbursement through 092121-102021 $55.00 ChadM11202021 11/20/2021 Cell Phone Reimbursement through 102121-112021 $55.00 ChadM12202021 12/20/2021 Cell Phone Reimbursement through 112121-122021 $55.00 ChadM01202022 01/20/2022 Cell Phone Reimbursement through 122121-012022 $55.00 ChadM02202022 02/20/2022 Cell Phone Reimbursement through 012122-022022 $55.00 ChadM03202022 03/20/2022 Cell Phone Reimbursement through 022122-032022 $55.00 ChadM04202022 04/20/2022 Cell Phone Reimbursement through 032122-042022 $55.00 ChadM05202022 05/20/2022 Cell Phone Reimbursement through 042122-052022 $55.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$605.00
34457 06/10/2022 Open Accounts Payable CLEARBLU ENVIRONMENTAL $486.60 Invoice Date Description Amount
27555 05/09/2022 Streets - May 2022 Haz Mat Services $486.60 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$486.60
34458 06/10/2022 Open Accounts Payable CSG CONSULTANTS, INC. $14,280.00 Invoice Date Description Amount
44070 06/06/2022 Regnart Creek Fencing Phase 1 through 05272022 $10,330.00 44071 06/06/2022 Regnart Creek Fencing Phase 2 through 05272022 $3,760.00 44072 06/06/2022 Regnart Creek Trail Proj. through 05272022 $190.00 Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$14,280.00
34459 06/10/2022 Open Accounts Payable CUPERTINO SUPPLY INC $250.70 Invoice Date Description Amount
291725 05/31/2022 Grounds - Mesh Sand Cloth, PVC SCH80, Cotton Rags, Pipe
$246.12
291818 06/01/2022 Grounds - OD Tubing, Tube Brass, Comp Nut Air Fitting
$4.58
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$250.70
34460 06/10/2022 Open Accounts Payable CYXTERA COMMUNICATIONS LLC $1,098.68 Invoice Date Description Amount
B1-2277277 06/01/2022 FY22 Colocation svcs July 2022 $1,098.68 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$1,098.68
user: Vi Tran Pages: 24 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 723
CC 08-16-2022
723 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
34461 06/10/2022 Open Accounts Payable Darcy Paul $150.93 Invoice Date Description Amount
PaulD051322 05/13/2022 Mileage Reimbursement for Sac Conference 051322 $150.93 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$150.93
34462 06/10/2022 Open Accounts Payable DEBORAH KAY HALL $187.00 Invoice Date Description Amount
060822 06/08/2022 Beading (5.5-5.26) 4 Participants $187.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$187.00
34463 06/10/2022 Open Accounts Payable Eflex Group, Inc $4,483.79 Invoice Date Description Amount
06032022 06/03/2022 FSA Employee Health pp 5/21/22-6/3/22 $4,483.79 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,483.79
34464 06/10/2022 Open Accounts Payable EWING IRRIGATION PRODUCTS, INC.
$6,279.99
Invoice Date Description Amount
16811309 05/18/2022 Grounds - White Spray Paint, Turf Royale, Compression Tee
$6,279.99
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$6,279.99
34465 06/10/2022 Open Accounts Payable FOLGER GRAPHICS INC $2,842.71 Invoice Date Description Amount
132585 05/31/2022 Postcard for BBF Golf Course Public Outreach $2,842.71 Paying Fund Cash Account Amount
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$2,842.71
34466 06/10/2022 Open Accounts Payable GARDENLAND POWER

EQUIPMENT
$3,708.05
Invoice Date Description Amount
936381 06/01/2022 Grounds - Edger 4HP Honda Eng $1,082.80 936382 06/01/2022 Grounds - 1200 Watt Battery Backpack, 36V Connect $2,625.25 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,708.05
34467 06/10/2022 Open Accounts Payable GEOTAB USA, INC. $2,646.43 Invoice Date Description Amount
IN307802 05/31/2022 Telematics Project - ProPlus Plan, Support May 2022 $2,646.43 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$2,646.43
user: Vi Tran Pages: 25 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 724
CC 08-16-2022
724 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
34468 06/10/2022 Open Accounts Payable GRACE DUVAL $630.00 Invoice Date Description Amount
Spring Payment 1 06/07/2022 payment for spring classes $630.00 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$630.00
34469 06/10/2022 Open Accounts Payable GRAINGER INC $1,526.72 Invoice Date Description Amount
9327823374 05/27/2022 Grounds - Tarp Flame Resistant Canvas $198.80 9332765123 06/02/2022 Streets - Hard Hat Type 1 Class G $165.14 9332765115 06/02/2022 Streets - Voltage Detector 50-1000VAC $75.17 9335613940 06/06/2022 Service Center - Batteries for Cabinet $35.08 9335613924 06/06/2022 Streets - Electronic Timer $652.11 9335613932 06/06/2022 Streets - Heat Gun Kit $400.42
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,526.72
34470 06/10/2022 Open Accounts Payable ICMA Retirement Trust-457 $18,520.53 Invoice Date Description Amount
06032022 06/03/2022 ICMA Deferred Comp pp 5/21/22-6/3/22 $18,520.53 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$18,520.53
34471 06/10/2022 Open Accounts Payable IFPTE LOCAL 21 $1,986.21 Invoice Date Description Amount
06032022 06/03/2022 Association Dues - CEA pp 5/21/22-6/3/22 $1,986.21 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,986.21
34472 06/10/2022 Open Accounts Payable IMPEC GROUP INC,. $92,439.47 Invoice Date Description Amount
2205126 05/31/2022 Facilities - May 2022 Janitorial Services $91,679.06 2205141 05/31/2022 Facilities - May 2022 Linda Vista Trail Gate Lock Down Services
$760.41
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$84,071.02
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$8,368.45
34473 06/10/2022 Open Accounts Payable IMPERIAL SPRINKLER SUPPLY, INC
$766.37
Invoice Date Description Amount
5127865-00 05/19/2022 Trees/ROW - Bushing, Apapter, Jumbo Valve Box $375.24 5133784-00 05/24/2022 Trees/ROW - Single D.B. Wire Red $391.13 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$766.37
user: Vi Tran Pages: 26 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 725
CC 08-16-2022
725 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
34474 06/10/2022 Open Accounts Payable INDEPENDENT CODE CONSULTANTS, INC.
$12,950.00
Invoice Date Description Amount
1597 06/01/2022 Solid Waste Management Review- The Rise- May services
$12,950.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$12,950.00
34475 06/10/2022 Open Accounts Payable INTERSTATE TRAFFIC CONTROL

PRODUCTS, INC
$3,217.81
Invoice Date Description Amount
250829 06/01/2022 Streets - Anchormate for 2" Sq Post X 24 $866.25 250828 06/01/2022 Streets - Special Order K Marker w/White Reflection $2,351.56 Paying Fund Cash Account Amount
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$3,217.81
34476 06/10/2022 Open Accounts Payable JIA THOMPSON $643.50 Invoice Date Description Amount
Spring Payment 1 06/06/2022 payment for spring classes $643.50 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$643.50
34477 06/10/2022 Open Accounts Payable KEVIN RIEDEN $440.00 Invoice Date Description Amount
KevinR09122021 09/12/2021 Cell Phone Reimbursement through 09122021 $55.00 KevinR07122021 07/12/2021 Cell Phone Reimbursement through 07122021 $55.00 KevinR10122021 10/12/2021 Cell Phone Reimbursement through 10122021 $55.00 KevinR11122021 11/12/2021 Cell Phone Bill through 11122021 $55.00 KevinR12122021 12/12/2021 Cell Phone Reimbursement through 12122021 $55.00 KevinR08122021 08/12/2021 Cell Phone Reimbursement through 08122021 $55.00 KevinR01122022 01/12/2022 Cell Phone Reimbursement through 01122022 $55.00 KevinR02122022 02/12/2022 Cell Phone Reimbursement through 02122022 $55.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$440.00
34478 06/10/2022 Open Accounts Payable LOU THURMAN $202.80 Invoice Date Description Amount
Spring Payment 1 06/06/2022 payment for spring classes $202.80 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$202.80
34479 06/10/2022 Open Accounts Payable MESITI-MILLER ENGINEERING, INC.
$12,438.60
Invoice Date Description Amount
0522038 05/31/2022 CE/SE for Regnart Road Improvement Phase 1 $1,743.00 0522032 05/31/2022 CE for Wilson Park Basketball Court through 05252022 $10,695.60 Paying Fund Cash Account Amount
user: Vi Tran Pages: 27 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 726
CC 08-16-2022
726 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$12,438.60
34480 06/10/2022 Open Accounts Payable NI GOVERNMENT SERVICES INC. $79.04 Invoice Date Description Amount
22052907051 06/01/2022 Traffic Period 5/1/22-5/31/22 $79.04 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$79.04
34481 06/10/2022 Open Accounts Payable ODP Business Solutions, LLC $153.63 Invoice Date Description Amount
240572127001 04/29/2022 Service Center - Perm Marker for Fleet $22.75 242076690001 05/04/2022 Serivce Center - Kitchen Supplies $130.88 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$153.63
34482 06/10/2022 Open Accounts Payable ODP Business Solutions, LLC $206.33 Invoice Date Description Amount
243069160001 05/09/2022 Service Center - Paper Towels - Kitchen $56.42 242238689002 05/05/2022 ink cartridges (black) for poster printer $37.02 243046276001 05/19/2022 Service Center - Tape Lettering, Comp Book $26.57 243046276002 05/24/2022 Service Center - Kitchen Supplies Creamer $86.32 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$206.33
34483 06/10/2022 Open Accounts Payable PARS/City of Cupertino $3,650.69 Invoice Date Description Amount
06032022 06/03/2022 PARS Employee pp 5/21/22-6/3/22 $3,650.69 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,650.69
34484 06/10/2022 Open Accounts Payable Pay Pal Inc VPS $93.35 Invoice Date Description Amount
120376547 04/30/2022 VSV0001160385 - Cupertinoweb2 April 2022 $35.35 121409560 05/31/2022 VSV0001160385 - Cupertinoweb2 May 2022 $38.05 121224118 05/31/2022 VSV0003096477 - Cupertinoweb4 May 2022 $19.95 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$93.35
34485 06/10/2022 Open Accounts Payable PROFESSIONAL TURF MANAGEMENT, INC.
$75.00
Invoice Date Description Amount
1214 05/31/2022 monthly gate service - May 2022 $75.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$75.00
34486 06/10/2022 Open Accounts Payable QUARTIC SOLUTIONS LLC $7,922.47 Invoice Date Description Amount
3145 05/23/2022 FY22 GIS Support Services - April & May 2022 $7,922.47 user: Vi Tran Pages: 28 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 727
CC 08-16-2022
727 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$7,922.47
34487 06/10/2022 Open Accounts Payable RECOLOGY SOUTH BAY $79,756.83 Invoice Date Description Amount
May-22 RY2 05/31/2022 City Payment per FA Rate Year 2/1/22- 1/31/23- May 2022
$79,756.83
Paying Fund Cash Account Amount
520 - Resource Recovery 520 100-100 (Cash & Investments Assets Operating Cash)
$79,756.83
34488 06/10/2022 Open Accounts Payable RINCON CONSULTANTS, INC. $8,244.33 Invoice Date Description Amount
38939 04/21/2022 Climate Action & Adaptation Plan Updates $8,244.33 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$8,244.33
34489 06/10/2022 Open Accounts Payable ROBERT HALF $3,728.80 Invoice Date Description Amount
60012906 05/18/2022 Tiago BL Support Assistance - week of 05/13/22 $932.20 60041506 05/24/2022 Tiago BL Support Assistance - week of 05/20/22 $932.20 60104085 06/02/2022 Tiago BL Support Assistance - week of 05/27/22 $932.20 60142501 06/08/2022 Tiago BL Support Assistance - week of 06/03/22 $932.20 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,728.80
34490 06/10/2022 Open Accounts Payable ROSS RECREATION EQUIPMENT, INC.
$410.64
Invoice Date Description Amount
I20574 03/10/2022 Grounds - Bucket Swings $410.64
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$410.64
34491 06/10/2022 Open Accounts Payable SAFETY COMPLIANCE MANAGEMENT, INC.
$1,790.00
Invoice Date Description Amount
5249 05/23/2022 Service Center Bloodborne Pathogens, Heat Illness Training
$1,790.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,790.00
34492 06/10/2022 Open Accounts Payable Sedgwick Claims Management Services, Inc.
$2,297.42
Invoice Date Description Amount
400000096479 06/01/2022 Workers' Compensation Claims 6/1/22-6/30/22 $2,297.42 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,297.42
user: Vi Tran Pages: 29 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 728
CC 08-16-2022
728 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
34493 06/10/2022 Open Accounts Payable Signawest Systems, Inc. $4,896.06 Invoice Date Description Amount
6359 05/20/2022 Facilities - Serv Call Fire Alarm Power Down, Defec.

FACU
$4,896.06
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,896.06
34494 06/10/2022 Open Accounts Payable SONITROL/PACIFIC WEST SECURITY, INC.
$1,995.00
Invoice Date Description Amount
61324 05/26/2022 Facilities - Library Installation $1,995.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,995.00
34495 06/10/2022 Open Accounts Payable Staples $147.96
Invoice Date Description Amount
3507529402 05/10/2022 coffee supplies for Sr. Center $147.96 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$147.96
34496 06/10/2022 Open Accounts Payable SUNNYVALE FORD $1,878.47 Invoice Date Description Amount
205457 05/24/2022 Fleet - Sensor 1HV $74.07
205636 05/31/2022 Fleet - Seal, Gasket, Thermos $141.36 205300 05/20/2022 Fleet - Screen, Gasket, Oil $154.13
205148 05/17/2022 Fleet - Sensor 1HV $458.33
205146 05/18/2022 Fleet - Gear AS1 HC, Core $1,050.58
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$1,878.47
34497 06/10/2022 Open Accounts Payable SUNSTATE EQUIPMENT CO., LLC $4,195.79 Invoice Date Description Amount
10762098-001 05/25/2022 Streets - Excavator Cordova Rd Retaining Wall $4,195.79 Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$4,195.79
34498 06/10/2022 Open Accounts Payable TERI GERHARDT $225.00 Invoice Date Description Amount
TeriG06022022 06/02/2022 Teri - Cell Reimbursements Nov. 17 2021 - April 17, 2022
$225.00
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$225.00
34499 06/10/2022 Open Accounts Payable US BANK $71,466.79 Invoice Date Description Amount
TravisW51622 05/16/2022 8746 cc charges $491.09
DomS51622 05/16/2022 9452 cc charges $79.46
JJavier051622 05/16/2022 5617 CC Charges $4.39
user: Vi Tran Pages: 30 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 729
CC 08-16-2022
729 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
RudyL051622 05/16/2022 8736 CC Charges $443.73
KimL05162022 05/16/2022 5169 CC Charges $2,445.20
DiegoZ051622 05/16/2022 8626 CC Charges $2,958.31
SelbyM051622 05/16/2022 1711 CC Charges $90.00
CherieW05162022 05/16/2022 6916 CC Charges $762.32
KaneW051622 05/16/2022 2813 CC Charges $1,979.10
ReiD051622 05/16/2022 1409CC Charges $4,827.26
JindyG051622 05/16/2022 0175 cc charges $228.65
AlexC05162022 05/16/2022 5300 CC Charges $1,141.55
JANETL051622 05/16/2022 9949 CC Charges $1,538.66
KarenL051622 05/16/2022 8993CCCharges $1,298.20
AmandaH51622 05/16/2022 9326 CC Charges $2,247.41
CollenF051622 05/16/2022 0798 cc charges $2,583.64
MelissaR051622 05/16/2022 0572 CC Charges $1,958.14
RobertD051622 05/16/2022 6680 CC Charges $1,194.26
LaurenS051622 05/16/2022 0578 CC Charges $954.97
KirstenS051622 05/16/2022 8069 CC Charges $629.79
MollyJ051622 05/16/2022 4137 CC Charges $214.96
SonyaL051622 05/16/2022 8808 CC Charges $758.87
KevinK051622 05/16/2022 8746 CC Charges $4,854.69
KennethE51622 05/16/2022 5954 CC Charges $732.28
RobG051622 05/16/2022 6980 cc charges $2,187.86
ShawnT051622 05/16/2022 7105 cc charges $735.40
BrianG051622 05/16/2022 6202 cc charges $778.09
UrsulaS051622 05/16/2022 2512 CC Charges $1,463.79
KevinG051622 05/16/2022 5856 cc charges $254.16
Ika051622 05/16/2022 8108 cc charges $1,010.93
CesarG051622 05/16/2022 9076 cc charges $192.53
AndrewS051622 05/16/2022 9993 cc charges $326.57
JonF051622 05/16/2022 3969 cc charges $743.31
TyB051622 05/16/2022 7739 cc charges $8,315.77
MarilynM05162022 05/16/2022 6763 CC Charges $140.50
SundariP051622 05/16/2022 9702 CC Charges $2,871.30
DanielM05162022 05/16/2022 9167 CC Charges for 5.16.2022 $1,212.38 JasonB051622 05/16/2022 2565 CC Charges $1,712.39
DebraN051622 05/16/2022 1090CCCharges $8,445.01
Branton051622 05/16/2022 5320 CC Charges $899.20
MariahG051622 05/16/2022 7882 CC Charges $720.56
RobertK051622 05/16/2022 7858 CC Charges $675.82
BennyH051622 05/16/2022 1015 CC Charges $4,364.29
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$52,966.92
230 - Env Mgmt Cln Crk Strm Drain 230 100-100 (Cash & Investments Assets Operating Cash)
$77.48
265 - BMR Housing 265 100-100 (Cash & Investments Assets Operating Cash)
$9.95
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$2,714.50
user: Vi Tran Pages: 31 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 730
CC 08-16-2022
730 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
280 - Park Dedication 280 100-100 (Cash & Investments Assets Operating Cash)
$51.25
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$51.25
520 - Resource Recovery 520 100-100 (Cash & Investments Assets Operating Cash)
$1,286.31
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$1,298.20
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$5,822.88
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$827.07
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$4,830.95
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$1,530.03
34500 06/10/2022 Open Accounts Payable ZAYO GROUP, LLC $2,628.11 Invoice Date Description Amount
2022060030583 06/01/2022 FY22 Disaster Recovery Telecom services - June 2022 $2,628.11 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$2,628.11
34501 06/10/2022 Open Accounts Payable Zoom Video Communications, Inc. $286.72 Invoice Date Description Amount
INV149297766 05/22/2022 Zoom Webinar 1000 -May 22, 2022-Jun 21, 2022 $286.72 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$286.72
Type EFT Totals: 61 Transactions $844,637.95
Main Account - Main Checking Account Totals
user: Vi Tran Pages: 32 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 731
CC 08-16-2022
731 of 1555
Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Checks Status Count Transaction Amount Reconciled Amount Open 71 $317,199.88 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 71 $317,199.88 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 61 $844,637.95 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 61 $844,637.95 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 132 $1,161,837.83 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 132 $1,161,837.83 $0.00
Grand Totals:

Checks Status Count Transaction Amount Reconciled Amount Open 71 $317,199.88 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 71 $317,199.88 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 61 $844,637.95 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 61 $844,637.95 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 132 $1,161,837.83 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 132 $1,161,837.83 $0.00
user: Vi Tran Pages: 33 of 33 Monday, June 13, 2022
Payment Register
**LIVE** Cupertino **LIVE**
From Payment Date: 6/4/2022 - To Payment Date: 6/10/2022 732
CC 08-16-2022
732 of 1555
RESOLUTION NO. 22-086

A RESOLUTION OF THE CUPERTINO CITY COUNCIL

RATIFYING CERTAIN CLAIMS AND DEMANDS PAYABLE IN THE

AMOUNTS AND FROM THE FUNDS AS HEREINAFTER DESCRIBED FOR

GENERAL AND MISCELLANEOUS EXPENDITURES FOR THE PERIOD
ENDING JUNE 20, 2022
WHEREAS, the Director of Administrative Services or her designated representative has certified to accuracy of the following claims and demands and to the availability of funds for payment hereof; and
WHEREAS, the said claims and demands have been audited as required by law.

NOW, THEREFORE, BE IT RESOLVED that the City Council does hereby allow the following claims and demands in the amounts and from the funds as hereinafter set forth in the attached Payment Register.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 16th day of August, 2022 by the following vote:

Vote Members of the City Council
AYES:

NOES:

ABSENT:

ABSTAIN:

SIGNED:
________
Darcy Paul, Mayor
City of Cupertino
________________________
Date
ATTEST:
________
Kirsten Squarcia, City Clerk
________________________
Date
733
CC 08-16-2022
733 of 1555
Resolution No. 22-XXX

Page 2 ends
← All documents from this meeting