BASIS OF BEARINGS N80°58'34"W
PARKSIDE LANE
IIIII
I
I
I
I
I
I I I I
I
I
I
I I
I
I
I
CC
CITY OF CUPERTINO GENERAL NOTES
1. All work shall be in accordance with the State of California Department of Transportation Standard Specifications (latest edition, as amended), and Standard Plans (latest edition, as amended), and City of Cupertino Standard Details. The Contractor shall perform the work described in the specification, and as shown on the drawings, and to the satisfaction of the City Engineer.
2. It shall be the responsibility of the Contractor to ensure the approved plans or the latest revised plans are furnished to its subcontractors, and to ensure the latest approved plans are onsite at all times during construction.
3. The Contractor shall notify the City two (2) working days prior to requiring an inspection.
4. Contractor shall provide traffic control at location where traffic is impacted prior to beginning of work.
5. The Contractor shall locate underground utilities in the area of work. The Contractor shall contact Underground Service Alert (USA) at 811 two (2) working days in advance of any work for location of the underground utilities.
6. Storm drain lines installed as part of the work on these plans shall be cleared of all debris and obstructions prior to final acceptance.
7. All trench backfill, fill areas, and base material shall attain a minimum 95% relative compaction. For typical trench sections, except for sanitary sewers, refer to the City Standard Details.
8. In the case of live tree roots from City trees, Contractor shall contact the City for field observation prior to removing tree roots.
9. Existing pavement that is removed or damaged shall be replaced as required by the City Engineer at the expense of the Contractor.
10. Manhole frames and covers shall be brought to finish grade prior to final signoff.
11. Concrete used in all concrete structures shall conform to California Department of Transportation Standard Specifications Section 90. Drop inlets, sidewalks, curbs and gutters shall contain 590 lbs. of cement per cubic yard and shall attain a minimum strength of 3,000 psi in 28 days.
12. One pound of dispersing black shall be mixed with each cubic yard of concrete at the batch plant.
13. New City standard street monuments and other permanent monuments disturbed during construction shall be replaced before acceptance of the improvements by the City Engineer. Attention is directed to Section 8771 of the California Business and Professions Code for the requirements concerning survey monuments. Existing survey monuments shall be located and referenced by or under the direction of a licensed land surveyor or registered civil engineer prior to construction operations, and a corner record or record of survey shall be filed with the County Surveyor of the County of Santa Clara. Existing survey monuments shall be reset to finish grade, and a corner record or record of survey shall be filed with the County Surveyor of the County of Santa Clara prior to the recording of the certificate of completion for the project.
14. Construction survey stakes or marks (control stakes) to establish lines and grades shall be set by the Contractor's surveyor or engineer.
15. Notify the City two (2) working days in advance of requiring services for checking field staking. Three (3) copies of the cut sheets shall be furnished to the City.
16. Contractor is responsible for dust control and ensuring the area adjacent to the work is left in a clean condition.
17. Contractor shall review City Detail 6-4 on tree protection prior to accomplishing any work or removing any trees.
18. Utilize Best Management Practices (BMP's), as required by the State Water Resources Control Board, for ANY activity, which disturbs the soil.
19. Contractor must provide a Construction and Demolition Debris Management Plan and register with Green Halo to track and upload waste generation tonnage information.
20. Project shall comply with the 2019 California Building Code (Base code 2018 IBC), 2019 CA Plumbing (2018 UPC), 2019 CA Green Building Code, and the Cupertino Municipal Code.
EST.1955
CUPERTINOCITY OF
WILSON PARK
BASKETBALL COURT
CITY OF CUPERTINO
CUPERTINO, CA
PROJECT NO. 2022-11
CIVIL SHEET INDEX
C0.0 COVER SHEET
C0.1 BEST MANAGEMENT PRACTICES
C1.0 SITE PLAN
C1.1 DEMOLITION PLAN
C2.0 PROFILES
C2.1 PROFILES
C3.0 DETAILS
C3.1 DETAILS
T1 TOPOGRAPHIC SURVEY
T2 TOPOGRAPHIC SURVEY
T3 TOPOGRAPHIC SURVEY
T4 TOPOGRAPHIC SURVEY
SD SD
SD SD
W W
NEW STORM DRAIN
EXISTING STORM DRAIN
EXISTING WATER
BD BD NEW BACK DRAIN
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
PROPOSED MAJOR CONTOUR
PROPOSED MINOR CONTOUR
100
100
GRADE BREAK
PROPERTY LINE
E(O/H) E(O/H) EXISTING ELECTRIC (OVERHEAD)
D
S
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
WATER VALVE
TREE
LEGEND
UD UD NEW UNDER DRAIN
DYH
BORING HOLE/BENCHMARK
FIRE HYDRANT
SURVEY CONTROL POINT
FLOW LINE
VEGETATION DRIPLINE
WILSON PARK
LOCATIONS OF EXISTING UTILITIES SHOWN ON THE PLANS ARE ONLY APPROXIMATE.
THE EXISTING UTILITIES SHOWN WERE PLOTTED USING INCOMPLETE AND IMPRECISE RECORDS. IT SHOULD BE EXPRESSLY UNDERSTOOD THIS INFORMATION DOES NOT
NECESSARILY REPRESENT ACTUAL OR COMPLETE SITE CONDITIONS OR SHOW
DETAILS OF EXACT LOCATION, DEPTH OR OTHER CONSTRUCTION FEATURES OF THESE UTILITIES. NO WARRANTY, EITHER EXPRESSED OR IMPLIED, AS TO THE COMPLETENESS OR ACCURACY OF THIS INFORMATION IS SET FORTH HEREIN. IT IS
THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THIS INFORMATION WITH THE AFFECTED UTILITIES PRIOR TO EXCAVATION. THE CONTRACTOR SHALL CALL "UNDERGROUND SERVICE ALERT" AT 1-800-642-2444 OR 8-1-1 FOR THE MARKING OF UNDERGROUND FACILITIES AT LEAST 2 DAYS PRIOR TO CONSTRUCTION.
CONTRACTOR SHALL HAND DIG AND LOCATE ALL UTILITIES THAT MAY BE AFFECTED
BY THE NEW FACILITIES IN THIS CONTRACT TO VERIFY ACTUAL DEPTH AND LOCATION
OF UTILITIES AND REPORT POTENTIAL CONFLICTS TO THE OWNER'S REPRESENTATIVE. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES WHETHER SHOWN OR NOT AND IS RESPONSIBLE FOR ALL DAMAGES TO EXISTING UTILITIES.
Know what'sbelow.
before you dig.Call
R
TREE REMOVAL
CIVIL+STRUCTURAL ENGINEERING
224 Walnut Ave, Suite B Santa Cruz, CA 95060
Phone (831) 426-3186
BASIS OF BREARINGS:
ASSUMED N 80°58'34" W FROM POINT #9 (HMH #310) TO POINT #10 (HMH #324) BASED ON REGNART CREEK
TRAIL IMPROVEMENT PLANS AND POINT COORDINATE DATA PROVIDED BY HMH BASIS OF ELEVATION:
ASSUMED ELEVATION AT HMH #342 AS 211.74 FEET PER HMH DATA
BASKETBALL COURT
PLAYGROUND
PLAYGROUND
COMMUNITY
BUILDING
SOCCER
FIELD
BASEBALL
FIELD
BASEBALL
FIELD BASEBALL
FIELD
REGNART CREEK
PARKSIDE LANE
COLD HARBOR AVENUE
WINTERGREEN DRIVE
BID ALTERNATE
LIME TREAT 24" MIN OF EXISTING MATERIAL BELOW BASKETBALL COURT AND CONCRETE WALKWAY AND RECOMPACT. EXCAVATE THE SWALE
AND BACKFILL BY CONTOUR GRADING THE GRASSY MOUND. REDUCE THE BACKFILL DEPTH AS NEEDED TO BALANCE.
1 11/02/22
Attachment D
$1
12 SD SD SD SD SD SD SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
?
?
?
?
?
210
209
211
212
213
214
210
215
209211
212
213
214
216
210
210
211
SD
SD
SD
SD
SD
UD
UD
UD
UD
UD
UD
UD
UD
UD
UD
UD
UD
UD UD
UD
UD
UD
UD
UD
UD
UD
UD
UD
C
C
210
211
212
213
214
215
214
213
212
209
212
210
211
210
212
211
210
209
209
216
215
216
UD
UD
UD
UD
UD
UD
UD
UD
UD
UD
UD
UD
UD UD
UD
UD
UD
UD
UD
UD
UD
UD
UD
C
C
210
211
212
213
214
215
214
213
212
209
212
210
211
210
212
211
210
209
209
216
215
216
CHECKED BY:
DRAWN BY:
SHEET
DESCRIPTION
4 3
2 1
0 REV. BY DATE
JOB NUMBER:
BID SET RC 10/13/2022
PREPARED AT THE REQUEST OF
WILSON PARK
BASKETBALL COURT
CITY OF CUPERTINO PUBLIC WORKS
10300 TORRE AVENUE
CUPERTINO, CA 95014-3202
CIVIL+STRUCTURAL ENGINEERING
224 Walnut Ave, Suite B Santa Cruz, CA 95060
Phone (831) 426-3186
MME, INC. Engineer retains all right and title. No part may be reproduced in any fashion or medium without the express written permission of the Engineer.These drawings are Instruments of Service, issued for a one-time, single use by the Owner. The entire contents of these Drawings are Copyright c 2022 SCALE:
SITE PLAN
1" = 10' C1.0
JP
RC
21143-P3
SITE PLAN
010' 5' 10' 20'
1" = 10'
SHEET NOTES
BASKETBALL COURT PAD. REMOVE A MINIMUM OF 24" OF
UNSUITABLE CLAY DOWN TO 206.5 AS SHOWN IN PROFILES
SHT C2.0. PLACE AND COMPACT IMPORTED ENGINEERED FILL.
PLACE AND COMPACT 6" OF AGGREGATE BASEROCK. PLACE
4" OF ASPHALT PAVEMENT TO APPROXIMATELY 12" ABOVE
EXISTING GRADE AS SHOWN BY PLAN ELEVATIONS. INSTALL
FULL SURFACE PAINT SYSTEM AND LINE MARKING NOVAPLAY
DETAIL 4/C3.0
EXTEND GRASSY MOUND WITH EXCAVATED NATIVE MATERIAL
FROM BELOW COURT AND WALKWAY. APPROXIMATE
CONTOURS SHOWN FOR ILLUSTRATION PURPOSES. REDUCE
MOUND SIZE TO ACCOMMODATE SWALE GRADING ONLY IF
BID ALTERNATE 1 IS SELECTED BY CITY.
EXISTING DRAINAGE INLET. DRAINAGE FOR THIS AREA
MAINTAINED BY NEW INLET AND SWALE WITH UNDERDRAIN
INSTALL NEW DRAINAGE INLET OUTSIDE OF COURT GRADING
AREA
VEGETATED DRAINAGE SWALE WITH UNDERDRAIN DETAIL
2/C3.0. CROSS SLOPES VARY TO MAINTAIN 0.5% MIN FLOWLINE SLOPE OF SWALE AND DRAIN. MAX CROSS SLOPE 3:1
NEW DRAINAGE INLET AND NEW 8" UNDERGROUND PIPING TO
A NEW JUNCTION DRAINAGE INLET
INSTALL ADA COMPLIANT CONCRETE PATHWAY. COMPACT 18"
OF IMPORTED FILL, AND COMPACT 4" OF AGGREGATE
BASEROCK. PLACE 5" REINFORCED CONCRETE PEDESTRIAN
PATHWAY PER DETAIL 3/C3.0
PROTECT EXISTING TREES IN PLACE, TYP PER CUPERTINO
STANDARD DETAILS 6-2 AND 6-4 / C3.0
ADJUST ADJACENT IRRIGATION HEADS AND SYSTEM TO
AVOID NEW PAVEMENT.
`2:1 RATIO OF IMPERVIOUS AREA TO THE RECEIVING
PERVIOUS AREA IS ACCEPTABLE PER C.3 STORMWATER
HANDBOOK
8" SOLID WALL STORM DRAIN PIPING
REPLACE EXISTING DRAINAGE INLET MAINTAIN RIM AND
INVERT ELEVATIONS
1 2
3 4
5 6
7 8
9 10
11 12
B/C2.0
B
A
A/C2.0
94'
84'
50'60'
5'
5'
210.50
209.90
210.50
209.90
1.0%
1.0%
208.76
RIM = 209.24
INV = 207.88
RIM = 209.55
INV = 208.55
0.5% MIN
0.5% MIN
0.5% MIN
2 5
3 6
1 RIM = 208.25
INV = 205.73
7 8
8 8
8 8
8 5
9 PLAYGROUND
TABLES
BASKETBALL COURT
PLAYGROUND
PLAYGROUND
COMMUNITY
BUILDINGSOCCER
FIELD
BASEBALL
FIELD
BASEBALL
FIELD BASEBALL
FIELD
REGNART CREEK
PARKSIDE LANE
COLD HARBOR AVENUE
WINTERGREEN DRIVE
210.50
209.90
209.00
210.20
210.20
209.42
0.5%MIN
C
C/C2.1
10 10
2.3%
1.5% 1.5% 0.5%
1.9%
7'
1.5%
RIM = 208.57
4" INV IN = 206.38
8" INV OUT = 206.364
5 126.1'
210.09
210.20
210.09
210.20
209.76
209.93
211.89
211.72
0.0%
22'
APPROXIMATE TOE OF CHANNEL BANK
11 12
1'
21.9'
APPROXIMATE LIMIT OF 2:1 SLOPE STABILITY PROTECTION AREA
54.8'
35.5'
71.3'
34.3'
30.5'
21.6'
19.8'
63.8' 56.5' 37.1'
APPROXIMATE TOP OF ±6FT DEEP CHANNEL BANK
EXISTING FENCE
56.6'37.1'
APPROXIMATE TOE OF CHANNEL BANK
0.0%
210.50
GRADING QUANTITY ESTIMATES
1. BALANCE ONSITE EXCAVATION AND BACKFILL BY CONTOUR
GRADING THE GRASSY MOUND.
2. REDUCE MOUND SIZE UNDER BID ALTERNATE 1 TO SUIT VOLUME AND BALANCE ON-SITE EXCAVATION AND BACKFILL.
3. CONTOUR GRADING MAY BE ADJUSTED IN THE FIELD PER CITY DIRECTION TO PROTECT EXISTING TREES.
EXCAVATION, WALKWAY
EXCAVATION, COURT
CONTOUR GRADING BACKFILL, WALKWAY
CONTOUR GRADING BACKFILL, COURT
175 CY
750 CY
175 CY
750 CY
I:\21143 P3 City of Cupertino - Wilson Park\dwg\C1.0 SITE PLAN.dwg, 10/25/2022 3:05:29 PM, AutoCAD PDF (General Documentation).pc3
SD SD SD SD SD SD SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
?
?
?
?
?
210
209
211
212
213
214
210
215
209211
212
213
214
216
210
210
211
210
211
212
213
214
215
214
213
212
209
212
210
211
210
212
211
210
209
209
216
215
216
CHECKED BY:
DRAWN BY:
SHEET
DESCRIPTION
4 3
2 1
0 REV. BY DATE
JOB NUMBER:
BID SET RC 10/13/2022
PREPARED AT THE REQUEST OF
WILSON PARK
BASKETBALL COURT
CITY OF CUPERTINO PUBLIC WORKS
10300 TORRE AVENUE
CUPERTINO, CA 95014-3202
CIVIL+STRUCTURAL ENGINEERING
224 Walnut Ave, Suite B Santa Cruz, CA 95060
Phone (831) 426-3186
MME, INC. Engineer retains all right and title. No part may be reproduced in any fashion or medium without the express written permission of the Engineer.These drawings are Instruments of Service, issued for a one-time, single use by the Owner. The entire contents of these Drawings are Copyright c 2022 SCALE:
DEMOLITION PLAN
1" = 10' C1.1
JP
RC
21143-P3
DEMOLITION PLAN
010' 5' 10' 20'
1" = 10'
SHEET NOTES
TREE PROTECTION FENCE, SEE CITY NOTES 6-2 AND 6-4 / C3.0
FENCING MAY BE ADJUSTED IN THE FIELD PER CITY
DIRECTION TO PROTECT EXISTING TREES
TEMPORARY CONSTRUCTION FENCE, CHAIN LINK FENCE
PANELS WITH CONCRETE POST FEET, APPROXIMATE
LOCATION SHOWN
REMOVE EXISTING DRAINAGE INLET
REMOVE EXISTING 8" DRAINAGE PIPING AND INSTALL NEW
DRAINAGE INLET TO OUTSIDE OF COURT GRADING AREA AT
DRAINAGE SWALE PER SITE PLAN
REMOVE EXISTING ASPHALT WALKWAY, NEATLY SAWCUT AT
LIMITS FOR SMOOTH TRANSITIONS
CLEAR AND GRUB EXISTING GRASSED AREA. STRIP TOPSOIL,
STOCKPILE AND COVER, AND RE-USE AS TOPSOIL ON
MOUNDED FILL SLOPES.
REMOVE EXISTING PICNIC AREAS: TABLES, BBQ GRILLS,
CONCRETE SLABS.
PROTECT EXISTING TREES IN PLACE, TYP. PRE-IRRIGATE ALL
TREES BEFORE CONSTRUCTION AND MAINTAIN SOIL
MOISTURE DURING CONSTRUCTION.
REMOVE EXISTING IRRIGATION VALVES, PIPING, HEADS, AND
WIRING FROM CLEARING AND GRUBBING AREA AND INSTALL
NEW IRRIGATION VALVES, PIPING, HEADS AND WIRING AFTER
GRADING. ADJUST ADJACENT HEADS AND SYSTEM TO AVOID
NEW PAVEMENT. PROTECT EXISTING SYSTEM IN PLACE
OUTSIDE OF CLEARED AREA AND REPAIR ANY DAMAGE FROM
CONSTRUCTION TRAFFIC OR WORK
HYDROSEED AND HYDROMULCH ALL DISTURBED AREAS AT
THE PROJECT COMPLETION USING SEED MIX APPROVED BY
THE CITY, INCLUDING AREAS DISTURBED BY CONSTRUCTION
TRAFFIC
1 2
3 4
5 6
7 8
9 102
1 1
PLAYGROUND
BASKETBALL COURT
PLAYGROUND
PLAYGROUND
COMMUNITY
BUILDINGSOCCER
FIELD
BASEBALL
FIELD
BASEBALL
FIELD BASEBALL
FIELD
REGNART CREEK
PARKSIDE LANE
COLD HARBOR AVENUE
WINTERGREEN DRIVE
3 4
5 6
6 7
7 8 1
8 8
8 8
9 1
10 CONSTRUCTION
ENTRANCE
REMOVE ASPHALT WALKWAY
10 10
10 NOTE: CONTRACTOR SHALL SUBMIT (C8D) DEBRIS MANAGEMENT PLAN PER SPECIFICATIONS.
I:\21143 P3 City of Cupertino - Wilson Park\dwg\C1.1 DEMO PLAN.dwg, 10/25/2022 3:05:37 PM, AutoCAD PDF (General Documentation).pc3
ELEVATION (FEET)
ELEVATION (FEET)
STATION (FEET)
190
200
210
220
230
190
200
210
220
230
2+00 3+00 3+40
STA=2+19.00
EL=209.37
STA=2+19.50
EL=206.50
STA=2+23.00
EL=210.20
STA=3+17.00
EL=210.20
STA=3+19.00
EL=206.50
STA=2+18.50
EL=206.75
ELEVATION (FEET)
ELEVATION (FEET)
STATION (FEET)
190
200
210
220
230
190
200
210
220
230
0+00 1+00 1+20
STA=0+95.00
EL=209.90
STA=0+35.00
EL=210.50
STA=0+07.57
EL=210.09
STA=0+05.57
EL=206.50
STA=0+94.00
EL=209.91
STA=0+98.50
EL=206.50
SCALE:
PROFILE B-B
H:1" = 5' / V:1" = 5'
C2.0
JP
RC
21143-P3
PROFILES
CHECKED BY:
DRAWN BY:
SHEET
DESCRIPTION
4 3
2 1
0 REV. BY DATE
JOB NUMBER:
BID SET RC 10/13/2022
PREPARED AT THE REQUEST OF
WILSON PARK
BASKETBALL COURT
CITY OF CUPERTINO PUBLIC WORKS
10300 TORRE AVENUE
CUPERTINO, CA 95014-3202
CIVIL+STRUCTURAL ENGINEERING
224 Walnut Ave, Suite B Santa Cruz, CA 95060
Phone (831) 426-3186
MME, INC. Engineer retains all right and title. No part may be reproduced in any fashion or medium without the express written permission of the Engineer.These drawings are Instruments of Service, issued for a one-time, single use by the Owner. The entire contents of these Drawings are Copyright c 2022 SCALE:
PROFILE A-A
H:1" = 5' / V:1" = 5'
94'8' 2'
8'60'20.4'7'2'
OVER EXCAVATE TO EL=206.5 AND PLACE
SELECT IMPORTED ENGINEERED FILL
6" BASEROCK 4" AC CONCRETE MOWBAND
SWALE WITH UNDERDRAIN AND
PERMEABLE BACKFILL DETAIL 2/C3.0
SWALE WITH UNDERDRAIN AND
PERMEABLE BACKFILL DETAIL 2/C3.0
4" AC6" BASEROCK
CONCRETE MOWBAND
OVER EXCAVATE TO EL=206.5 AND PLACE
SELECT IMPORTED ENGINEERED FILL
5" CONCRETE4" BASEROCK
1.0%1.5%
1 3 MAXSLOPE VARIES
1 3 MAX
I:\21143 P3 City of Cupertino - Wilson Park\dwg\C2.0 PROFILES.dwg, 10/25/2022 3:05:46 PM, AutoCAD PDF (General Documentation).pc3
ELEVATION (FEET)
ELEVATION (FEET)
STATION (FEET)
190
200
210
220
230
190
200
210
220
230
0+00 1+00
C2.1
JP
RC
21143-P3
PROFILES
CHECKED BY:
DRAWN BY:
SHEET
DESCRIPTION
4 3
2 1
0 REV. BY DATE
JOB NUMBER:
BID SET RC 10/13/2022
PREPARED AT THE REQUEST OF
WILSON PARK
BASKETBALL COURT
CITY OF CUPERTINO PUBLIC WORKS
10300 TORRE AVENUE
CUPERTINO, CA 95014-3202
CIVIL+STRUCTURAL ENGINEERING
224 Walnut Ave, Suite B Santa Cruz, CA 95060
Phone (831) 426-3186
MME, INC. Engineer retains all right and title. No part may be reproduced in any fashion or medium without the express written permission of the Engineer.These drawings are Instruments of Service, issued for a one-time, single use by the Owner. The entire contents of these Drawings are Copyright c 2022 SCALE:
PROFILE C-C
H:1" = 5' / V:1" = 5'
CONTOUR GRADING NATIVE FILL FROM COURT AND
WALKWAY OVER EXCAVATION. PLACE FILL IN
ACCORDANCE WITH GEOTECHNICAL ENGINEER
RECOMMENDATIONS. REDUCE FILL PLACEMENT
FOR BID ALT 1
I:\21143 P3 City of Cupertino - Wilson Park\dwg\C2.0 PROFILES.dwg, 10/25/2022 3:05:50 PM, AutoCAD PDF (General Documentation).pc3
C3.0
JP
RC
21143-P3
DETAILS
CHECKED BY:
DRAWN BY:
SHEET
DESCRIPTION
4 3
2 1
0 REV. BY DATE
JOB NUMBER:
BID SET RC 10/13/2022
PREPARED AT THE REQUEST OF
WILSON PARK
BASKETBALL COURT
CITY OF CUPERTINO PUBLIC WORKS
10300 TORRE AVENUE
CUPERTINO, CA 95014-3202
CIVIL+STRUCTURAL ENGINEERING
224 Walnut Ave, Suite B Santa Cruz, CA 95060
Phone (831) 426-3186
MME, INC. Engineer retains all right and title. No part may be reproduced in any fashion or medium without the express written permission of the Engineer.These drawings are Instruments of Service, issued for a one-time, single use by the Owner. The entire contents of these Drawings are Copyright c 2022 SCALE: 3/4" = 1'-0"
2DRAINAGE SWALE
4" MIN
6"
3 MAX
1 CLEANOUT PER DETAIL 3 WITH
CAP AT FINISHED GRADE
BEGINNING OF LINE
UNDERDRAIN CLEANOUT WITH
RIM TO FINISHED GRADE SEE
SITE PLAN FOR LOCATION AND
INVERT
NATIVE SOIL
PERFORATED OR SLOTTED SLOPED
UNDERDRAIN (SLOPE AT 0.5% MIN)
WITH PERFORATIONS DOWN SEE
PLAN FOR CONNECTION TO C.B. &
FOR INVERT ELEVATION
12" MIN OF CLASS II PERMEABLE ROCK
PER CALTRANS SPECIFICATIONS
12"
30 MIL IMPERMEABLE LINER ON
COURT SIDE
F.G.
DEPTH VARIES
4"
2' MIN BELOW BASE
MIN 2'
BEYOND EDGE OF
MOW BAND
6"
E.G.
SCALE: 1" = 1'-0" 1WITH ENGINEERED FILL SUB-BASE
BASKETBALL COURT
1'-0"
CONCRETE
MOW BAND
6"4"
REMOVE 24"
UNSUITABLE
CLAY MATERIAL AND
REPLACE WITH
ENGINEERED FILL
#5 REBAR HORIZ
CONTINUOUS
TYP, CENTER IN
CURB, 3" CLR
4" ASPHALT CONCRETE
PAVEMENT OVER 6"
AGGREGATE BASE
NOVAPLAY
SURFACE SYSTEM
FOR NEW HOT
MIX ASPHALT
BASKETBALL
COURTS
3H MIN:1V
4"
2' MIN BELOW BASE
MIN 2'
BEYOND EDGE OF
MOW BAND
6"
E.G.
SCALE: 1" = 1'-0" 1.1WITH LIME TREATED SUB-BASE
BASKETBALL COURT BID ALT 1
1'-0"
CONCRETE
MOW BAND
6"4"
LIME TREAT 24"
UNSUITABLE
CLAY MATERIAL AND
RECOMPACT
#5 REBAR HORIZ
CONTINUOUS
TYP, CENTER IN
CURB, 3" CLR
4" ASPHALT CONCRETE
PAVEMENT OVER 6"
AGGREGATE BASE
NOVAPLAY
SURFACE SYSTEM
FOR NEW HOT
MIX ASPHALT
BASKETBALL
COURTS
3H MIN:1V
2' MIN BELOW BASE
MIN 2'
BEYOND EDGE OF
WALKWAY
E.G.
SCALE: 1" = 1'-0"
3CONCRETE WALKWAY DETAIL
5"4"
REMOVE 24" OF
UNSUITABLE CLAY
MATERIAL AND REPLACE
WITH ENGINEERED FILL OR
LIME TREAT AND
RECOMPACT PER BID ALT 1
5" CONCRETE
PAVEMENT REINF
#4 @ 16" EW OVER
4" AGGREGATE
BASE
3H MIN:1V
SCALE:
4 NA
NOVAPLAY SURFACE DATA SHEET
I:\21143 P3 City of Cupertino - Wilson Park\dwg\C3.0 DETAILS.dwg, 10/25/2022 3:05:58 PM, AutoCAD PDF (General Documentation).pc3
C3.1
JP
RC
21143-P3
DETAILS
50' INSIDE SIDELINES
R6' R6'R6'
5'-3"
4'-0"
6'-0"
42'-0"42'-0"
19'-9" TYP
84'-0" INSIDE SIDELINES
BASKETBALL HOOP WITH
NYLON NET
SCALE:
51" = 5'
BASKETBALL COURT
19'-0"
7'-0"
3'-0"
TYP
5'-3"
12" WIDE X 8" LONG
2" WIDE X 8" LONG
EXTERIOR LINE SHALL BE 4"
THICK COLOR WHITE
ALL INTERIOR PLAY LINES
SHALL BE 2" THICK
EXTERIOR PLAY LINE
SHALL BE 4" THICK
COLOR WHITE
POINT OF TANGENCY
POINT OF BEGINNING:
CENTER OF CIRCLE AND COURT
SEE SITE PLAN FOR LOCATION
ASPHALT COURT WITH SPORT
COURT SURFACING PER NOVAPLAY
SURFACE SPEC SHEET 20 / C3.1
BASKETBALL GOAL POST
COLOR: GREY
COLOR: GREY
1'-0"2"
4'-0"
12" CONCRETE MOWBAND
R2'-0"
COLOR: STADIUM BLUE
4'
ALL LINES SHALL BE COLOR WHITE
COLOR:GREY
R19'-9"
SCALE: NTS
6GOAL POST REINFORCEMENT
DIAMETER 24"
3" CLR
8 VERTICAL #5 BARS
SPIRAL #3 BAR AT 5" PITCH PER
GEOTECHNICAL ENGINEER,
SPIRALS W / 3" PITCH FOR THREE
FULL TURNS AT TOP AND BOTTOM
OF PIER
CL OF POST AND PIER
POST PER SCHEDULE
SCALE: 1/2" = 1'-0" 7GOAL POST FOUNDATION
FINISHED GRADE
3" CLR
BASKETBALL GOAL POST
GROUND ANCHOR
DEPTH 10'
EMBEDMENT DEPTH
PER MANUFACTURER
REINFORCED
CONCRETE PIER
PLAYING SURFACE
SLAB OVER PIER
STEP 3: REFER TO
DETAIL 6 & 7 FOR
POST FOUNDATION
AND REINFORCEMENT
NOTE:
INSTALL GOALSETTER SYSTEMS
INC. MVP SIGNATURE SERIES
GOALPOST WITH 72" ACRYLIC
BACKBOARD AND GOALSETTER
HD BREAKAWAY BASKETBALL
HOOP WITH NYLON NET.
SEE GOALSETTER INSTALLATION
AND OWNERS INSTRUCTIONS
FOR COMPLETE INSTALLATION
GUIDLINES.
SCALE:
8 NA
GOALSETTER GOAL POST DETAIL
CHECKED BY:
DRAWN BY:
SHEET
DESCRIPTION
4 3
2 1
0 REV. BY DATE
JOB NUMBER:
BID SET RC 10/13/2022
PREPARED AT THE REQUEST OF
WILSON PARK
BASKETBALL COURT
CITY OF CUPERTINO PUBLIC WORKS
10300 TORRE AVENUE
CUPERTINO, CA 95014-3202
CIVIL+STRUCTURAL ENGINEERING
224 Walnut Ave, Suite B Santa Cruz, CA 95060
Phone (831) 426-3186
MME, INC. Engineer retains all right and title. No part may be reproduced in any fashion or medium without the express written permission of the Engineer.These drawings are Instruments of Service, issued for a one-time, single use by the Owner. The entire contents of these Drawings are Copyright c 2022
MIN CLEARANCE
I:\21143 P3 City of Cupertino - Wilson Park\dwg\C3.0 DETAILS.dwg, 10/25/2022 3:06:01 PM, AutoCAD PDF (General Documentation).pc3
BASIS OF BEARINGS N80°58'34"W
PARKSIDE LANE
PLAYGROUND
BBQ AREA
PLAYGROUND
BASEBALL FIELD
BASEBALL FIELD
BASEBALL FIELD
SOCCER FIELD
RESTROOMS
TURF
WINTERGREEN DRIVE
RESTROOMS
COMMUNITY BUILDING
COLD HARBOR AVE
DF
DF
REGNART CREEK
1 203.33
MON
3 205.44
MAG
4 208.00
MAG
5 208.51
MAG
6 209.98
MAG
7 209.36
X
8 212.15
MAG
9 209.44
MAG HMH 310
10 211.74
MAG HMH 342
11 211.73
MAG HMH 343
12 209.85
X
13 210.43
X
14 210.08
X
15 210.85
X
IIIII
I
I
I
I
I
I I I I
I
I
I
I I
I
I
I
TO FUTURE BRIDGE
FUTURE CREEK TRAIL
TR TR TR
TR
TR TR
TR
TR
TR
TR
TR
TR
TR
TR
4" PRV
4" BFP
BBQ
BBQ
BBQ
BBQ
TABLE TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
TABLE
BLEACHERS
BLEACHERS
BLEACHERS
BLEACHERS
SSMH
SSMH
D D D
D D D
DD
D
TR
CC
SHEET T4.0
SHEET T3.0
SHEET T2.0
SCALE:
TOPOGRAPHIC SURVEY TITLE SHEET
1" = 40'
T1.0
JP
RC
21143-P3
TOPOGRAPHIC SURVEY TITLE SHEET
040' 20' 40' 80'
1" = 40'
SIGN
TREE
WATER VALVE
DRAINAGE INLET
SURVEY CONTROL POINT
BUILDING
EXISTING CONTOURS
SURVEY NOTES
LEGEND
CHECKED BY:
DRAWN BY:
SHEET
DESCRIPTION
4 3
2 1
0 REV. BY DATE
JOB NUMBER:
BID SET RC 10/13/2022
PREPARED AT THE REQUEST OF
WILSON PARK
BASKETBALL COURT
CITY OF CUPERTINO PUBLIC WORKS
10300 TORRE AVENUE
CUPERTINO, CA 95014-3202
CIVIL+STRUCTURAL ENGINEERING
224 Walnut Ave, Suite B Santa Cruz, CA 95060
Phone (831) 426-3186
MME, INC. Engineer retains all right and title. No part may be reproduced in any fashion or medium without the express written permission of the Engineer.These drawings are Instruments of Service, issued for a one-time, single use by the Owner. The entire contents of these Drawings are Copyright c 2022 FENCE
1. DATE OF SURVEY: 09/23/2021 - 10/11/2021
2. BASIS OF BEARINGS: ASSUMED N 80°58'34" W FROM POINT #9 (HMH #310) TO POINT #10 (HMH #342) BASED ON REGNART CREEK TRAIL IMPROVEMENT PLANS
AND POINT COORDINATE DATA PROVIDED BY HMH
3. BASIS OF ELEVATION: ASSUMED ELEVATION AT HMH #342 AS 211.74 FEET PER
HMH DATA
4. THIS IS NOT A BOUNDARY SURVEY. PROPERTY LINES AND EASEMENTS NOT
SURVEYED
5. UNDERGROUND UTILITIES WERE NOT LOCATED, UNLESS NOTED OTHERWISE
6. CONTOUR INTERVAL IS 1 FOOT
7. TREES TALLER THAN 8" DIAMETER AND IN DRIP LINE AREAS NOT LOCATED
8. PLAYGROUND EQUIPMENT NOT LOCATED
9. IRRIGATION CONTROL VALVES NOT LOCATED
DRINKING FOUNTAIN
STORM DRAIN PIPESD SD SD
TRASH RECEPTICLE
DRIPLINE, APPROXIMATE
UNKNOWN STORM DRAIN ?SD ?SD ?SD
LIGHT
IRRIGATION CONTROL VALVE
TR
DF
I
ABBREVATIONS
REDWOOD
TREE
OAK
SYCAMORE
UNLESS NOTED OTHERWISE
R
T
O
S
UNO
CHISLED "X"X LOCATIONS OF EXISTING UTILITIES SHOWN ON THE PLANS ARE ONLY APPROXIMATE.
THE EXISTING UTILITIES SHOWN WERE PLOTTED USING INCOMPLETE AND IMPRECISE RECORDS. IT SHOULD BE EXPRESSLY UNDERSTOOD THIS INFORMATION DOES NOT
NECESSARILY REPRESENT ACTUAL OR COMPLETE SITE CONDITIONS OR SHOW
DETAILS OF EXACT LOCATION, DEPTH OR OTHER CONSTRUCTION FEATURES OF THESE UTILITIES. NO WARRANTY, EITHER EXPRESSED OR IMPLIED, AS TO THE COMPLETENESS OR ACCURACY OF THIS INFORMATION IS SET FORTH HEREIN. IT IS
THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THIS INFORMATION WITH THE AFFECTED UTILITIES PRIOR TO EXCAVATION. THE CONTRACTOR SHALL CALL "UNDERGROUND SERVICE ALERT" AT 1-800-642-2444 OR 8-1-1 FOR THE MARKING OF UNDERGROUND FACILITIES AT LEAST 2 DAYS PRIOR TO CONSTRUCTION.
CONTRACTOR SHALL HAND DIG AND LOCATE ALL UTILITIES THAT MAY BE AFFECTED
BY THE NEW FACILITIES IN THIS CONTRACT TO VERIFY ACTUAL DEPTH AND LOCATION
OF UTILITIES AND REPORT POTENTIAL CONFLICTS TO THE OWNER'S REPRESENTATIVE. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES WHETHER SHOWN OR NOT AND IS RESPONSIBLE FOR ALL DAMAGES TO EXISTING UTILITIES.
Know what'sbelow.
before you dig.Call
R
STORM DRAIN MANHOLESDMH
SEWER MANHOLESSMH
STORM DRAIN INLET COVERD
SANITARY SEWER CLEANOUTC
I:\21143 P3 City of Cupertino - Wilson Park\dwg\T1.0 - TOPOGRAPHIC SURVEY.dwg, 10/25/2022 3:06:10 PM, AutoCAD PDF (General Documentation).pc3
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD SD SD SD SD SD SD SD
SD
SD
SD
SD
SD
SD
SD
SDSD
SD
SDSD
SD
SDSD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD 208.53
208.25
208.14
208.31
208.34
208.29
207.69
12S
10T
12T
208.02
208.58
207.69
207.70
207.62
208.42
208.48
208.81209.90
210.68210.90210.85
210.75
210.67
209.97
209.83
209.42
209.14
209.54
209.68
209.79
209.72209.85
210.06
211.05
211.50
211.28
210.23
209.87 209.90
209.96
209.51
209.06
208.89
208.92
209.29
209.49
209.91
209.95209.78
209.80
209.83
209.84
209.74
209.61
209.86
209.90
209.48 209.25
209.14
209.06
209.18
209.21
208.94
208.67
208.62
208.18
208.46
208.36
208.52
208.70
208.54
208.47
208.31
207.96
207.88
208.34
208.40
207.76
207.68
207.88
207.99
208.10
208.42
208.47
208.41
208.40
208.43
208.43
208.44
208.43
208.40
208.42
208.34
208.19
208.47
208.46
208.37
208.37
208.32
208.37
208.60
208.70
208.79
208.72208.73
208.69
208.67
208.68
208.64
208.56
208.50
208.29
208.56
208.51
208.52
208.55
208.58
208.58
208.54 207.73
208.74
209.60
210.02
210.35
210.17
209.52
12 S
18 S
18 S
14 S
16 S
14 S
16 S
24 R
208.58208.57
208.75
208.58
209.20
209.37
209.17
209.04
208.91
209.09
208.98
208.99
208.98
209.08
209.79
210.17
209.87
209.80
210.12
210.39
210.64
210.62
210.65
210.52
209.50
210.81210.81
211.12
210.86
210.93210.88
211.17
211.42211.03
211.37
210.96
211.10
211.19
211.56
211.54
211.52
211.76
211.91
208.95
209.16
209.10
209.01
209.01
209.28
209.48
209.41
209.10
209.04
209.06
209.05
208.99
209.08
208.53
208.48
208.54
208.78
208.97
20 S
12 S
210.90
210.66
210.49
209.82
209.72
209.18
209.02
209.48
211.70
211.98
211.78212.02
210.82
210.83
210.88
209.85 209.68
209.62
209.92
209.84
209.88
209.80
209.67
209.66
208.94
208.91
208.99 209.14
209.01
208.98
208.96
209.20
209.21
208.96
208.81
208.84
208.25
205.73
208.20
205.99
211.96
213.09
213.90
214.07
215.26
216.60
216.06
215.05
216.19
215.76
212.01
210.92
210.89
210.83
211.18
211.17
210.47
210.27
210.13
210.38
209.73
209.69
209.89
210.51
210.88
210.46
210.18
210.40
210.76
210.66
210.42
210.33
209.58
209.70
209.79209.51
209.40
214.49
214.67
216.27
213.75
213.82
213.24
212.66 212.59
212.81
212.82
212.73
213.21
214.23
214.87
214.54
214.00
213.26
210.30
210.26
209.94
209.98
210.03
209.47
209.67
209.62
208.92
209.62
208.59
209.30
210.17
210.92
209.54
209.59
209.43
209.44
209.47
208.88
208.69
208.89
209.39
210.01
210.42
212.11
210.79
209.48
209.4726 P
20 P
22 P
24 P
42 R
14 P
18 R
18 R
18 R
18 R24 R
211.33211.94
32 R
36 R 22 P
209.75
209.90
210.02
209.96
209.83
209.88
209.79
209.94 209.94
209.93
209.94
209.94
209.77
209.79
209.89
209.92
209.92
209.86
209.92209.84
209.81
209.89
210.09
209.96
209.89
209.92
209.89
209.88 209.88
209.82
209.82
209.82
209.82
209.82209.87
209.89
209.81
209.78
209.89
210.00
210.10
210.32
210.52
210.67
210.85
211.02
211.15
211.38
211.54
211.70
211.76
211.78
211.72
211.90
211.93
211.88
211.98
211.97
212.87
212.56
212.85
212.57
211.84
211.57
211.32
211.10
210.91
210.68210.53210.38210.28210.11210.12210.11210.08
209.49
209.37 209.40 209.39 209.43
209.46
209.36
209.30
209.34
209.62
209.71
209.86
209.96
210.13
210.16210.15
210.28
210.38
210.38
210.41
210.29210.01209.99209.97
209.78
209.59
209.43
208.66 208.61
208.62208.67
205.64 208.28
208.72
209.08
208.12
207.65
208.55
209.16
209.24
209.38
209.07
208.57
207.88
208.24
208.34
209.03
209.54
209.20
209.20
209.10 209.47
208.35
207.91
208.54
207.44
207.44 207.45
207.45
203.17
207.22
207.25 207.24
207.23
203.96
209.84 209.94
210.00 210.06 210.06 210.32 210.50
209.59209.54
209.35
210.04 210.08
209.75
209.52209.48
209.67
209.29209.34
209.12
209.85
209.76
BASIS OF BEARINGS N80°58'34"W
?SD
?SD
?SD
?SD
?SD
?SD
?SD
?SD
?SD
210
209
211
212
213
214
210
215
209211
212
213
214
216
208
209
210
210
211
210
209
204.62
208.33
205.66
209.59
208.74
208.79
208.93
208.78
208.82
208.76
208.40
208.42
208.57
208.59208.36
208.12
207.65
18 T12 T6 MULT T
209.88
208.03
204.26
208.03
207.73
204.61
207.30
207.23
204.20
38 R
16 O
12 T
PLAYGROUND
BASEBALL FIELD
COLD HARBOR AVE
REGNART CREEK
5 208.51
MAG
6 209.98
MAG
9 209.44
MAG HMH 310
10 211.74
MAG HMH 342
11 211.73
MAG HMH 343
12 209.85
X
13 210.43
X
TO FUTURE BRIDGE
FUTURE CREEK TRAIL
TR
TR
TR
TR
BBQ
BBQ
BBQ
BBQ
TABLE TABLE
TABLE
TABLE
TABLE
BLEACHERS
BLEACHERS
D D
D TR
SCALE:
TOPOGRAPHIC SURVEY
1" = 20'
T2.0
JP
RC
21143-P3
TOPOGRAPHIC SURVEY
020' 10' 20' 40'
1" = 20'
CHECKED BY:
DRAWN BY:
SHEET
DESCRIPTION
4 3
2 1
0 REV. BY DATE
JOB NUMBER:
BID SET RC 10/13/2022
PREPARED AT THE REQUEST OF
WILSON PARK
BASKETBALL COURT
CITY OF CUPERTINO PUBLIC WORKS
10300 TORRE AVENUE
CUPERTINO, CA 95014-3202
CIVIL+STRUCTURAL ENGINEERING
224 Walnut Ave, Suite B Santa Cruz, CA 95060
Phone (831) 426-3186
MME, INC. Engineer retains all right and title. No part may be reproduced in any fashion or medium without the express written permission of the Engineer.These drawings are Instruments of Service, issued for a one-time, single use by the Owner. The entire contents of these Drawings are Copyright c 2022 RIM = 207.22
INV = 203.96
8" NW, 6" S
DI 10X15
RIM = 207.44
INV = 203.17
8" NW, 8" E
DI 10X15
RIM = 208.20
INV = 205.99
8" E
DI 18X20
RIM = 208.25
INV = 205.73
12" N, 12" S, 8" E, 8" W
DI 24X24
RIM = 211.33
DI 24X24
RIM = 208.61
INV = 205.64
8" N, 8" S
INDIVIDUAL TREES IN THIS
AREA NOT LOCATED
DI 18X20
RIM = 208.48
INV = 205.66
8" N, 12" S, 8"E
INDIVIDUAL TREES IN THIS
AREA NOT LOCATED
INDIVIDUAL TREES IN THIS
AREA NOT LOCATED
DI 10X15
SILTED
DI 10X15
RIM = 208.33
INV = 205.8
8" S
DI 10X15
RIM = 208.02
INV = 204.26
8" W DI 10X15
RIM = 207.73
INV = 204.61
8" N
DI 10X15
RIM = 207.30
INV = 204.70
8" S, 8" E
DI 10X15
RIM = 207.23
INV = 204.20
8" W, 8" E
I:\21143 P3 City of Cupertino - Wilson Park\dwg\T1.0 - TOPOGRAPHIC SURVEY.dwg, 10/25/2022 3:06:13 PM, AutoCAD PDF (General Documentation).pc3
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
203.50
203.57 203.70 203.77 203.87
203.95 204.05 204.10 204.22 204.32 204.46
204.58
204.66
204.73
205.08205.12205.06204.99204.84204.73204.71204.70204.61204.50204.40204.33204.26204.18 204.05
203.94
203.54
203.56
203.62
204.07
204.08
204.15204.22 204.31 204.33 204.44 204.46 204.58 204.68 204.70 204.78 204.79 204.88 205.03 205.13 205.28 205.23 205.34
206.16205.31205.41205.23205.16
205.15
206.06
206.80
207.65
207.76
208.06
208.94
208.34
204.90 204.98
205.54
206.69
207.28
207.71
208.12
208.44
208.37
208.01
207.98
208.38
208.02
207.87207.90
207.98
208.32
208.53
208.25
208.14
208.31
208.34
208.41
208.18
208.07
208.15
208.28
208.34
208.26
207.72
207.10
206.81
206.14
205.39205.11205.08
204.93
205.36205.48
204.11
204.08
204.88
205.66
206.44
207.00
207.17
206.92
206.17
204.96
204.69
204.81
204.62204.42204.36204.33
204.18
204.56
205.32
205.58 205.86
207.72
207.56
207.50
207.52 207.54
207.69
206.30
206.49
206.90
207.45
208.06
208.11
207.81207.20206.96206.86
207.12
207.28
207.91
208.10
208.29
207.69
207.37
207.07 207.09
207.08207.06
201.87
10S
16S
12S 14T
16O
8O
8O
6O
8O14O
22O
24P
14S
14S
12S
12S
12S
10S
12S
10T
12T
208.02
12S
208.25
208.18
208.58
208.67
208.15
207.90
203.27
203.27
203.30
203.44
203.37
203.43
203.88
203.88
203.91
203.76
203.75
203.76
203.75
203.93
203.93
203.89
203.80
203.96
204.09 204.08
203.29
200.51
200.23
203.98203.97
203.94
205.04
205.61
206.13
206.96
207.58
207.91
208.04
208.01
207.87
207.68
207.60
206.78
206.37
206.27
206.37
206.40206.32
206.49
206.57
206.18
206.14206.21
206.17
205.70
205.57
205.30 205.16
205.13
205.71
205.78
206.51
206.86 206.43
206.26
205.45
204.99
204.98
204.94
205.45205.49
205.24
204.98
204.98
204.88
200.98202.19
200.94
206.22
205.42
204.96
205.48
205.63
206.04
206.24206.20206.16206.18
206.12
206.02
205.50
204.99
205.98
203.89
203.81
203.71
203.85
203.84
204.04
204.09 204.29
203.96
203.75
204.30
204.18
204.04 204.01
203.99
204.28204.39
204.63
204.63
205.72
206.22
205.69
206.18
206.24
206.32206.37
206.46
207.16
207.62
208.75
207.84
207.56
207.80
207.63
207.07 206.47 205.90
206.38
205.57205.82206.11208.53
208.71208.75
207.20 207.14
207.07 207.10 207.03 206.98
206.85 206.35
206.51
206.52
206.40
206.44
206.85
207.02
207.70207.70207.75
207.80
207.74
207.61
208.34
208.61
208.89
209.16
209.25209.08
209.01
206.75
206.66
206.38
206.41
206.87
207.15
207.42
207.29
207.07
207.12
207.18
207.60
207.88
207.93
207.95
208.22
207.09
207.32
206.53
206.44
206.55
206.54
206.86
205.70
206.44
206.56 206.50
204.16
205.01
204.95 204.53
204.52
206.72 206.19 206.12
8 T
8 T
10 T
16 R
12 R
32 R
8 R
209.21
203.13
202.93
202.99
202.33
201.54
200.43
202.55202.55202.55
203.13
202.55
201.36
201.38
202.58
203.06
205.09
208.92
209.29
209.49
209.91
209.95209.78
209.80
209.83
209.84
209.74
209.61
209.86
209.90
209.48 209.25
209.14
209.06
209.18
209.21
208.94
208.67
208.62
208.18
208.46
208.36
208.52
208.70
208.54
208.47
208.31
207.96
207.88
208.34
208.40
207.76
207.68
207.89
208.10
208.21
208.40
208.33
208.35
208.42
208.42 208.40
208.28
208.10
208.21
208.23
207.94
207.88
207.99
208.10
208.42
208.47
208.41
208.40
208.43
208.43
208.44
208.43
208.40
208.42
208.34
208.19
208.47
208.46
208.37
208.37
208.32
208.37
208.60
208.70
208.79
208.72208.73
208.69
208.67
208.68
208.64
208.56
208.50
208.16
208.29
208.19
208.24
208.56
208.51
208.52
208.55
208.58
208.58
208.54 207.73
208.74
209.60
210.02
210.35
210.17
209.52
12 S
18 S
18 S
14 S
16 S
208.58208.57
208.75
208.58
209.20
209.37
209.17
209.04
209.06
209.05
208.99
209.82
209.72
209.18
211.70
211.98
210.82
209.75
209.90
210.02
209.96
209.83
209.88
209.79
209.94 209.94
209.93
209.94
209.94
209.77
209.79
209.89
209.92
209.92
209.86
209.92209.84
209.81
209.89
210.09
209.96
209.89
209.92
209.89
209.88 209.88
209.82
209.82
209.82
209.82
209.82209.87
209.89
209.81
209.78
209.25
209.32
209.38
209.47
209.49
209.52
209.52
209.56
209.60
209.65
209.69
209.70209.59
209.69
209.71
209.89
210.00
210.10
210.32
210.52
210.67
210.85
211.02
211.15
211.38
211.54
211.70
211.76211.97
211.84
211.57
211.32
211.10
210.91
210.68210.53210.38210.28210.11210.12210.11210.08
209.49
209.37 209.40 209.39 209.43
209.46
209.36
209.34209.32
209.47 209.56
209.45209.36
209.28
209.16
209.05
208.89
208.99
209.43209.44209.45209.41
209.40
209.43
209.42
209.42
209.44
209.45
209.39209.34
209.25
209.29
209.53
209.30
209.34
209.62
209.71
209.86
209.96
210.13
210.16210.15
210.28
210.38
210.38
210.41
210.29210.01209.99209.97
209.78
209.59
209.43
208.66 208.61
208.62208.67
205.64
204.95
208.94208.96
208.96 208.94
209.28
207.11
207.17
207.16 207.04
207.06 206.95 206.54
206.78206.74 206.55 206.39 206.62 206.80
206.76
206.41
206.58
206.73206.64
206.49206.50206.46
206.43
206.43
206.43
206.51
206.50206.55
206.54 206.54 206.40 206.44 206.62
206.06
206.54206.25206.13206.26206.40206.48206.56
207.38
207.44207.53
207.73
207.82
207.90
207.90 207.93 207.98
207.81
207.79 207.75 207.64 207.56 207.54 207.50
207.45
207.81
207.83
207.96 207.86
207.23207.24
207.21
207.18
207.20207.19
207.27
207.28
207.27
207.24
207.72
26 R
32R
14T 14T 14T
14T
206.62
206.49
206.87
207.03
207.02
207.15207.26
207.24207.19 207.12207.15
208.74
209.48
208.20
207.90
208.47
208.13 207.58
208.19
207.89
208.11
210.83
211.15
211.21
211.02
211.22
208.28
208.72
209.08
208.50
208.12
207.65
208.55
209.16
209.24
209.07
208.57
207.88
208.24
207.87
207.18
207.48
208.34
209.03
209.54
209.20
209.20
209.10 209.47
208.35
207.91
208.54
207.44
207.44 207.45
207.45
203.17
207.22
207.25 207.24
207.23
203.96
209.84 209.94
210.00 210.06 210.06 210.32 210.50
209.59209.54
209.35
210.04 210.08
209.75
209.52209.48
209.67
209.29
209.33209.32
209.34
209.28
208.57
209.12
209.85
209.76
206.43206.43
211.72
212.23
212.23
212.66
212.40
212.65
208.23
208.18
208.31
208.72
208.26
209.10
209.77
209.94
210.55210.91
211.25
211.82
212.08
212.65
212.79
212.98
212.94
213.06
213.29
213.44
213.29
213.28213.18
212.82
212.51
212.24
212.10
211.51
210.95
210.46
210.14
209.65
209.18
208.68
208.56
208.22
208.31
208.16
208.54
208.57
208.61
208.56
208.59
208.57
208.55208.50
208.46
208.47
208.28
208.45
208.65
208.50
208.42
208.56
208.82
209.29
209.76
210.23 210.51210.60
210.69
210.61
210.48
210.23210.15209.98209.81
209.66
209.58
209.40
209.25
208.98
208.84
208.76
208.59
208.53
208.42
208.32 208.41
208.40208.40208.39
208.43
208.42208.47208.36
208.42208.47
12 T
10 T
12 T
8 T
10 T
8 T
12 T 210.82
211.13
210.47
210.50
209.58
208.57
208.20
208.22
208.27
208.22
203.54
208.42
208.54
208.49
208.41
208.39
208.41
208.40
208.49
208.68
208.68
208.83
208.88
208.72
208.82
208.65
208.72
208.71
208.60208.54
212.70
212.69
212.60212.68
212.66
212.80
212.65
212.66
212.81
212.85212.81
212.77
212.80212.94
208.85
208.80
212.67
212.70 208.76
208.74
208.56
213.36
213.32
?SD
?SD
?SD
?SD
?SD
?SD
210
208
209
211
210
209
210209211212213
208.33
208.92
48 R
208.03
204.26
208.03
207.73
204.61
207.30
207.23
204.20
208.14
203.56
203.23
207.13
38 R
202.22
203.13
PLAYGROUND
BBQ AREA
PLAYGROUND
BASEBALL FIELD
TURF
WINTERGREEN DRIVE
RESTROOMS
COMMUNITY BUILDING
DF
1 203.33
MON
3 205.44
MAG4
208.00
MAG
5 208.51
MAG
7 209.36
X
8 212.15
MAG
10 11
211.73
MAG HMH 343
13 210.43
X
IIIII
I
I
I
I
I
I I I I
I
I
I
I I
I
I
I
?SD ?SD ?SD ?SD ?SD ?SD ?SD ?SD ?SD ?SD
TR
TR
TR
TR
TR
4" PRV
4" BFP
BBQ
BBQ
TABLE TABLE
TABLE
TABLE
TABLE
TABLE
BLEACHERS
BLEACHERS
SSMH
SSMH
D
D
D
TR
CC
T3.0
JP
RC
21143-P3
TOPOGRAPHIC SURVEY
CHECKED BY:
DRAWN BY:
SHEET
DESCRIPTION
4 3
2 1
0 REV. BY DATE
JOB NUMBER:
BID SET RC 10/13/2022
PREPARED AT THE REQUEST OF
WILSON PARK
BASKETBALL COURT
CITY OF CUPERTINO PUBLIC WORKS
10300 TORRE AVENUE
CUPERTINO, CA 95014-3202
CIVIL+STRUCTURAL ENGINEERING
224 Walnut Ave, Suite B Santa Cruz, CA 95060
Phone (831) 426-3186
MME, INC. Engineer retains all right and title. No part may be reproduced in any fashion or medium without the express written permission of the Engineer.These drawings are Instruments of Service, issued for a one-time, single use by the Owner. The entire contents of these Drawings are Copyright c 2022 SCALE:
TOPOGRAPHIC SURVEY
1" = 20' 020' 10' 20' 40'
1" = 20'
WILSON PARK SIGN
INDIVIDUAL TREES IN THIS
AREA NOT LOCATED
DI 18X20
RIM = 207.06
INV = 201.87
12" NW, 12" NE
8" SW, 8" SE
DI 12X12
RIM = 208.20
INV = 203.54
8" E
DI 24X24
RIM = 208.61
INV = 205.64
8" N, 8" S
DI 24X24
RIM = 208.94
INV = 204.95
8" N, 8" S, 8" SW
CURB INLET
RIM = 203.29
INV = 200.23
12" S, 12" N
DI 18X20
RIM = 204.98
INV = 200.94
12" N, 12" S
RIM = 207.22
INV = 203.96
8" NW, 6" S
DI 10X15
RIM = 207.44
INV = 203.17
8" NW, 8" E
DI 10X15
RIM = 208.33
INV = 205.8
8" S
DI 10X15
RIM = 208.02
INV = 204.26
8" W DI 10X15
RIM = 207.73
INV = 204.61
8" N
DI 10X15
RIM = 207.30
INV = 204.70
8" S, 8" E
DI 10X15
RIM = 207.23
INV = 204.20
8" W, 8" E
DI 10X15
RIM = 208.14
INV = 203.56
8" W, 8" N
DI 10X15
RIM = 207.13
INV = 203.23
12" SW
SDMH
RIM = 209.25
INV = 203.13
8"N, 8"S
SDMH
RIM = 208.92
INV = 202.22
8" NW, 8" NE, 8" S
I:\21143 P3 City of Cupertino - Wilson Park\dwg\T1.0 - TOPOGRAPHIC SURVEY.dwg, 10/25/2022 3:06:16 PM, AutoCAD PDF (General Documentation).pc3
SD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
207.58
207.91
208.04
208.01
207.87
207.68
207.60
207.80
207.20 207.14
207.07 207.10 207.03 206.98
206.85207.70207.70207.75
207.80
207.74
207.61
208.34
208.61
208.89
209.16
209.25209.08
209.01
207.93
208.22
207.09
207.32
8 R
209.21
203.13
205.09
211.05
211.50
211.28
211.96
213.09
213.90
214.07
216.19
215.76
212.01
210.92
210.89
209.25
209.32
209.38
209.47
209.49
209.52
209.52
209.56
209.60
209.65
209.69
209.70209.59
209.69
209.71
209.89
210.00
210.10
210.32
210.52
210.67
210.85
211.02
211.15
211.38
211.54
211.70
211.76
211.78
211.72
211.90
211.93
211.88
211.98
211.97
212.87
212.56
212.85
212.57
211.84
211.57
211.32
211.10
210.91
210.68210.53210.38210.28210.11210.12210.11210.08210.14
209.98209.96
210.06210.06
210.15210.10210.10
209.59 209.34 209.33
209.58 209.54
209.46 209.49
209.37 209.40 209.39 209.43
209.46
209.36
209.34 209.32
209.47 209.56
209.45209.36
209.28
209.16
209.05
208.89
209.43209.44209.45209.41
209.40
209.43
209.42
209.42
209.44
209.45
209.39209.34
209.25
209.29
209.53
209.30
209.34
209.62
209.71
209.86
209.96
210.13
210.16210.15
210.28
210.38
210.38
210.41
210.29210.01209.99209.97
209.78
209.59
209.43
208.66 208.61
208.62208.67
205.64
204.95
208.94208.96
208.96 208.94
209.28
207.11
207.17
207.16 207.04
207.06
207.73
207.90
207.27
207.15207.26
207.24207.19 207.12 207.15
208.74
209.48
208.20
207.90
208.47
208.13 207.58
208.19
208.11
210.83
211.15
211.21
210.24
210.14
210.15
210.36
210.38
210.34
210.30
210.32
210.22 209.86 209.89 209.88 209.84 209.94
210.00 210.06 210.06 210.32 210.50
209.59209.54209.51209.51209.55209.52209.84210.15210.32210.37 210.27 210.01 209.73 209.68 209.73 209.71
210.09
209.91
209.86
210.00210.03
209.90
209.98
210.06
209.31 209.35
210.04 210.08
209.75
209.52209.48
209.67
209.29
209.33209.32
209.34
209.28
210.41
210.39
210.44
210.40
210.38
210.43
210.17210.16210.08
210.06210.07
210.04209.97
210.08210.12210.12210.09210.22210.50210.67210.81211.26
211.29
211.42
211.59
211.87
212.10
212.22
212.11
212.72212.76
212.77
212.73
212.37
212.28
211.88
211.82
211.80
212.17
212.12
212.00
211.95
211.78
211.59
211.48
211.36
211.25
211.19
211.11
211.04
210.50
210.52
210.92
210.76
210.70
210.70
210.64
210.54
210.46
210.36
210.24
210.13
210.11
210.06
210.04
209.92
209.78
209.67 209.86
209.98
210.09
210.22
210.27
210.28
210.34
210.43
210.56
210.65
210.70
210.81
210.90
210.89
210.88
211.08
211.13
210.88
210.88
211.28
211.32
211.32
211.43
211.51
211.69
211.77
211.92
212.09
212.11
212.28
212.31
212.30
212.34
212.41212.46212.49
212.59
212.80
212.81
212.15 212.24
212.27
212.28
212.25
212.19
211.93211.80211.75
211.74
211.73
211.66
211.51
211.47
211.31
211.09
211.00
210.84
210.81
210.76
210.71
210.63
210.60
210.54
210.47
210.46
210.43
210.38
210.26
210.19
210.20
210.16
210.08
209.97
209.87
209.76
209.65
209.62
209.59
209.54
209.42
209.30
209.16 209.34
209.78 209.49
209.93 209.62
210.03 209.74
210.12 209.75
210.24 209.78
210.30 209.85
210.38 209.94
210.43
210.04
210.41 210.11
210.46 210.18
210.53 210.29
210.62
210.32
210.68
210.32
210.77
210.39
210.89
210.53
210.95
210.91
210.86
210.99
211.01 210.58
211.00
211.34
211.68
211.73
211.40
211.06
210.67
210.98
210.94
211.05
211.08 210.75
211.09
210.78
211.15
210.85
211.21
210.90
211.28
210.94
211.39
211.00
211.52
211.13
211.55
211.27211.59
211.55
211.77
211.65
211.87
211.86
212.10
211.89
212.26
212.20
211.80
212.17
211.78
212.10
211.77
212.03
211.72
211.94
211.68
211.89
211.60
211.82 211.48
211.53
211.50211.43
211.44
211.35211.28
211.32211.39
211.67
211.29
211.62
211.27
212.05
212.04
212.03
212.04212.09
212.00
212.00
211.86
211.77211.74
212.04
212.18212.07
212.04
212.12
212.25
212.33
212.50
212.63
212.76
212.73
212.76
212.69
212.30212.26
212.24
212.41
212.47212.56
212.70
212.80
212.78
211.77
211.74
211.96
211.98
211.66
211.64
211.86211.86
211.68
211.75
211.24
211.01
211.12
211.07
210.90 210.77 210.66 210.55
210.56210.54
210.51 210.45 210.36 210.24
210.07
209.88 209.87 209.88 209.90 209.91 209.89
209.85209.89
209.86
209.83
209.80209.80
209.76
209.82 209.80 209.84 209.90 209.93 209.98 210.04 210.10 210.16 210.18 210.22 210.34210.27210.23210.16210.06210.04210.01209.98209.96209.94209.94209.88 209.93209.95209.90
210.10 209.94 209.91 209.95 209.99 209.98 209.99 210.02 209.97 209.98 210.03 210.02 210.02 210.04 210.06 210.07 210.10 210.19 210.29 210.27 210.40
209.16
209.14 209.13
209.14
204.30
209.25
209.28209.29
209.25
209.15
209.18 209.16
209.14
204.90
209.08
209.03 209.04
209.13
205.08
208.90
208.93 208.92
208.93
205.66
210.16210.04
210.08 210.16
210.25210.05
210.05210.03210.05 210.09 210.10210.07 210.10210.10 210.08 210.03 210.06 210.98210.84
210.88211.04210.78
211.59
215
214
216
210
209
PARKSIDE LANE
208.92
38 R
202.22
203.13
BASEBALL FIELD
BASEBALL FIELD
BASEBALL FIELD
SOCCER FIELD
RESTROOMS
RESTROOMS
DF
4 208.00
MAG
7 209.36
X
10 211.74
MAG HMH 342
11 211.73
MAG HMH 343
13 14
210.08
X
15 210.85
X
I I I I
I
FUTURE CREEK TRAIL
TR TR TR
TR
TR TR
TR
BLEACHERS
BLEACHERS
BLEACHERS
BLEACHERS
D D D
D D D
DD
D
TR
C
T4.0
JP
RC
21143-P3
TOPOGRAPHIC SURVEY
CHECKED BY:
DRAWN BY:
SHEET
DESCRIPTION
4 3
2 1
0 REV. BY DATE
JOB NUMBER:
BID SET RC 10/13/2022
PREPARED AT THE REQUEST OF
WILSON PARK
BASKETBALL COURT
CITY OF CUPERTINO PUBLIC WORKS
10300 TORRE AVENUE
CUPERTINO, CA 95014-3202
CIVIL+STRUCTURAL ENGINEERING
224 Walnut Ave, Suite B Santa Cruz, CA 95060
Phone (831) 426-3186
MME, INC. Engineer retains all right and title. No part may be reproduced in any fashion or medium without the express written permission of the Engineer.These drawings are Instruments of Service, issued for a one-time, single use by the Owner. The entire contents of these Drawings are Copyright c 2022 SCALE:
TOPOGRAPHIC SURVEY
1" = 20' 020' 10' 20' 40'
1" = 20'
BLEACHERS
DI 24X24
RIM = 208.90
INV = 205.66
8" E
DI 24X24
RIM = 209.03
INV = 205.08
8" E, 8" W, 8" S
DI 24X24
RIM = 209.14
INV = 204.90
8" E, 8" W, 8" S
DI 24X24
RIM = 209.13
INV = 204.30
8" N, 8" E, 8" S, 8" W
RIM = 209.25
SILTED
DI 24X24
RIM = 208.61
INV = 205.64
8" N, 8" S
DI 24X24
RIM = 208.94
INV = 204.95
8" N, 8" S, 8" SW
SDMH
RIM = 209.25
INV = 203.13
8"N, 8"S
SDMH
RIM = 208.92
INV = 202.22
8" NW, 8" NE, 8" S
I:\21143 P3 City of Cupertino - Wilson Park\dwg\T1.0 - TOPOGRAPHIC SURVEY.dwg, 10/25/2022 3:06:19 PM, AutoCAD PDF (General Documentation).pc3