©
T:\PROJECTS\2021 PROJECTS\21059_WILSONPARKCOMMUNITYGARDENCUPERTINO\3_CONSTRUCTIONDOCUMENTS\21059_CV.DWG
WILSON PARK
COMMUNITY GARDEN
PROJECT NO. 2020-01.1
CUPERTINO, CALIFORNIA
WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN WRITING UNAUTHORIZED CHANGES & USES: THE ENGINEER PREPARING THESE PLANS
SITE MAP
LOCATION MAP
WILSON PARK
COMMUNITY GARDEN
CUPERTINO
CITY OF
EST.1955
©
L1.0
PROJECT
LOCATION
1 L1.0 COVER SHEET
2 L1.1 NOTES
3 L2.0 DEMOLITION AND EROSION CONTROL PLAN
4 L2.1 EROSION CONTROL DETAILS
5 L3.0 GRADING AND DRAINAGE PLAN
6 L4.0 SITE CONSTRUCTION PLAN
7 L5.0 PLANTING AND IRRIGATION PLAN
8-12 L6.0-L6.4 CONSTRUCTION DETAILS
13 L7.0 BEST MANAGEMENT PRACTICES
SHEET INDEX
SHEET NO. TITLE DRAWING
PROJECT BASIS OF BEARING
PROJECT BENCHMARK
HORIZONTAL CONTROL POINT #1:
MAG NAIL ON ASPHALT PATH AT SOUTHWEST CORNER OF PROJECT SITE HORIZONTAL CONTROL POINT #2:
MONUMENT FOUND AT ON THE STREET AT THE CORNER OF
WINTERGREEN DRIVE AND S. PORTAL AVENUE
SEE SITE CONSTRUCTION PLAN, SHEET L5.0
2025 Gateway Place, Suite 285
San Jose, CA 95110
T 408.275.0565
www.callanderassociates.com
CALLANDER ASSOCIATES
LANDSCAPE ARCHITECTURE
CALA Project No. 21056
ELEV DATUM:
EXISTING MAG NAIL ON ASPHALT PATH AT SOUTHWEST CORNER OF PROJECT SITE, SEE GRADING AND DRAINAGE PLAN, SHEET L4.0 11/07/2022
Attachment D
WILSON PARKCOMMUNITY GARDEN
DRAWN BY:SHEET TITLESHEET
CHECKED BY:SCALE:PROJECT NO:ISSUEDATE
2025 Gateway Place, Suite 285San Jose, CA 95110T 408.275.0565 DNGH/MMAs Shown21059
OF
File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_CV.dwg Plot Date: 11/4/22 Saved By: KkongCopyright © 2020 Callander Associates Landscape Architecture, Inc.13 REVISIONDATECUPERTINO, CA BID SUBMITTAL06/08/22
www.callanderassociates.com
NOTESL1.1
SDSDSD
SDSDSD
SDSD
TURF
IIIII
IIIII
IIIII I
IIII
I
I
I
TR
4" PRV4" BFPSSMHSSMH
CC
SDTRI
WILSON PARKCOMMUNITY GARDEN
DRAWN BY:SHEET TITLESHEET
CHECKED BY:SCALE:PROJECT NO:ISSUEDATE
2025 Gateway Place, Suite 285San Jose, CA 95110T 408.275.0565 DNGH/MMAs Shown21059
OF
File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DM.dwg Plot Date: 11/4/22 Saved By: GhuangCopyright © 2020 Callander Associates Landscape Architecture, Inc.13 REVISIONDATECUPERTINO, CA BID SUBMITTAL06/08/22
www.callanderassociates.com
DEMOLITION ANDEROSION CONTROLPLANL2.0
WILSON PARKCOMMUNITY GARDEN
DRAWN BY:SHEET TITLESHEET
CHECKED BY:SCALE:PROJECT NO:ISSUEDATE
2025 Gateway Place, Suite 285San Jose, CA 95110T 408.275.0565 DNGH/MMAs Shown21059
OF
File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DT.dwg Plot Date: 11/4/22 Saved By: GhuangCopyright © 2020 Callander Associates Landscape Architecture, Inc.13 REVISIONDATECUPERTINO, CA BID SUBMITTAL06/08/22
www.callanderassociates.com
EROSION CONTROLDETAILSL2.14
SDSDSDSDSDSD
SDSD
1203.33MON
4208.00MAG
WILSON PARKCOMMUNITY GARDEN
DRAWN BY:SHEET TITLESHEET
CHECKED BY:SCALE:PROJECT NO:ISSUEDATE
2025 Gateway Place, Suite 285San Jose, CA 95110T 408.275.0565 DNGH/MMAs Shown21059
OF
File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_GD.dwg Plot Date: 11/4/22 Saved By: GhuangCopyright © 2020 Callander Associates Landscape Architecture, Inc.13 REVISIONDATECUPERTINO, CA BID SUBMITTAL06/08/22
www.callanderassociates.com
GRADING ANDDRAINAGE PLANL3.0
SDSDSDSDSDSD
SDSD
WILSON PARKCOMMUNITY GARDEN
DRAWN BY:SHEET TITLESHEET
CHECKED BY:SCALE:PROJECT NO:ISSUEDATE
2025 Gateway Place, Suite 285San Jose, CA 95110T 408.275.0565 DNGH/MMAs Shown21059
OF
File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_SC.dwg Plot Date: 11/4/22 Saved By: GhuangCopyright © 2020 Callander Associates Landscape Architecture, Inc.13 REVISIONDATECUPERTINO, CA BID SUBMITTAL06/08/22
www.callanderassociates.com
SITECONSTRUCTIONPLANL4.0
SDSDSDSDSDSD
SDSD48 R
TT T
T
T
TT
T
WILSON PARKCOMMUNITY GARDEN
DRAWN BY:SHEET TITLESHEET
CHECKED BY:SCALE:PROJECT NO:ISSUEDATE
2025 Gateway Place, Suite 285San Jose, CA 95110T 408.275.0565 DNGH/MMAs Shown21059
OF
File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_IR.dwg Plot Date: 11/4/22 Saved By: GhuangCopyright © 2020 Callander Associates Landscape Architecture, Inc.13 REVISIONDATECUPERTINO, CA BID SUBMITTAL06/08/22
www.callanderassociates.com
PLANT LISTPLANTING ANDIRRIGATION PLANL5.0
WILSON PARKCOMMUNITY GARDEN
DRAWN BY:SHEET TITLESHEET
CHECKED BY:SCALE:PROJECT NO:ISSUEDATE
2025 Gateway Place, Suite 285San Jose, CA 95110T 408.275.0565 DNGH/MMAs Shown21059
OF
File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DT.dwg Plot Date: 11/4/22 Saved By: GhuangCopyright © 2020 Callander Associates Landscape Architecture, Inc.13 REVISIONDATECUPERTINO, CA BID SUBMITTAL06/08/22
www.callanderassociates.com
DETAILSL6.08
WILSON PARKCOMMUNITY GARDEN
DRAWN BY:SHEET TITLESHEET
CHECKED BY:SCALE:PROJECT NO:ISSUEDATE
2025 Gateway Place, Suite 285San Jose, CA 95110T 408.275.0565 DNGH/MMAs Shown21059
OF
File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DT.dwg Plot Date: 11/4/22 Saved By: GhuangCopyright © 2020 Callander Associates Landscape Architecture, Inc.13 REVISIONDATECUPERTINO, CA BID SUBMITTAL06/08/22
www.callanderassociates.com
DETAILSL6.19
OMMUNITYCARDENGILSONWARKPMAXIMUMOCCUPANCY48 PERSONS
WILSON PARKCOMMUNITY GARDEN
DRAWN BY:SHEET TITLESHEET
CHECKED BY:SCALE:PROJECT NO:ISSUEDATE
2025 Gateway Place, Suite 285San Jose, CA 95110T 408.275.0565 DNGH/MMAs Shown21059
OF
File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DT.dwg Plot Date: 11/4/22 Saved By: GhuangCopyright © 2020 Callander Associates Landscape Architecture, Inc.13 REVISIONDATECUPERTINO, CA BID SUBMITTAL06/08/22
www.callanderassociates.com
DETAILSL6.210
WILSON PARKCOMMUNITY GARDEN
DRAWN BY:SHEET TITLESHEET
CHECKED BY:SCALE:PROJECT NO:ISSUEDATE
2025 Gateway Place, Suite 285San Jose, CA 95110T 408.275.0565 DNGH/MMAs Shown21059
OF
File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DT.dwg Plot Date: 11/4/22 Saved By: GhuangCopyright © 2020 Callander Associates Landscape Architecture, Inc.13 REVISIONDATECUPERTINO, CA BID SUBMITTAL06/08/22
www.callanderassociates.com
DETAILS
11L6.3
WILSON PARKCOMMUNITY GARDEN
DRAWN BY:SHEET TITLESHEET
CHECKED BY:SCALE:PROJECT NO:ISSUEDATE
2025 Gateway Place, Suite 285San Jose, CA 95110T 408.275.0565 DNGH/MMAs Shown21059
OF
File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_DT.dwg Plot Date: 11/4/22 Saved By: GhuangCopyright © 2020 Callander Associates Landscape Architecture, Inc.13 REVISIONDATECUPERTINO, CA BID SUBMITTAL06/08/22
www.callanderassociates.com
DETAILSL6.412
WILSON PARKCOMMUNITY GARDEN
DRAWN BY:SHEET TITLESHEET
CHECKED BY:SCALE:PROJECT NO:ISSUEDATE
2025 Gateway Place, Suite 285San Jose, CA 95110T 408.275.0565 DNGH/MMAs Shown21059
OF
File Path: T:\Projects\2021 Projects\21059_WilsonParkCommunityGardenCupertino\3_ConstructionDocuments\21059_CV.dwg Plot Date: 11/4/22 Saved By: KkongCopyright © 2020 Callander Associates Landscape Architecture, Inc.13 REVISIONDATECUPERTINO, CA BID SUBMITTAL06/08/22
www.callanderassociates.com
BEST MANAGEMENTPRACTICESL7.0