Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

Rapidly Scalable No Construction,
No Electrical Work
Charge 24/7: Night,
Rain, Grid Failures
Any Brand Charger,
Pre-Mounted
EV ARC™ 2020
The EV ARC™ 2020 from Beam Global is the only rapidly deployed, 100% renewable, transportable but permanent EV charging solution. Grid independent, it deploys in minutes with no permitting, no construction, no electrical work and no utility bill. It will charge electric vehicles with the EV charger brand of your choice, even during grid outages.

Sustainable EV Charging
Each EV ARC™ system generates and stores its
own electricity and tracks the sun to generate up
to 25% more energy. Battery storage allows you to
charge during the night, inclement weather and
power outages. It fits inside a standard parking
space and because vehicles easily park on the
base pad you won’t lose a single spot. Reaching
as many as 12 vehicles, you can charge up to six
EVs at the same time.

Join organizations like Google, New York City and
Caltrans who are Driving on Sunshine.

EV Charging Deployed in Minutes Not Months
BeamForAll.com [email protected]
Attachment D

Mechanical
Array Dimensions 20.7 L x 10.7 W ft
Max Height 15.3 ft
Min Clearance 9 ft
Base-Pad Footprint 18 L x 7.5 W ft
Weight 5 <12,500 lbs
Surface Loading 6 8.14 psi
Standard Shipping Methods ARC Mobility™ Trailer/ Truck & Trailer / Shipping Container
EV ARC™ Stowed Ship Size 7 18 L x 7.5 W x 7.6 H ft
Performance
Solar Array 4.4 kW
Range 1 Up to 265 e-miles in a single day
Battery Storage Options 20, 30, 40 kWh
Total EV Charger Power 2 Up to 5.76 kW
EV Charger Type 3, 4 Any brand; 1-6 plugs;
type J1772
Certified Wind Load 160 mph
Major Component Ratings
EVSE: UL 2231, UL 2594
Solar Panels: UL 1703
Battery: Cells UL 1642 UL/ULC 2580, PCC Thermal
Management Encapsulant UL 94 V0
Inverter: UL 1741-2010/2018, IEEE1547a-2003/2014, FCC 15 class B, UL 1741SA, CA Rule 21, HECO Rule 14H
The EV ARC™ 2020 is off-grid so generates no utility bill and can charge EVs during power outages.

It provides emergency power for first responders, is wind-rated to 160 mph, flood-proof to 9.5’ and ADA compliant. Units are deployed in minutes by a Beam Deployment Expert and require zero contact.

1. Range will vary based on local conditions

2. Actual total output power depends on EV model and charger model

3. Supports a variety of quality EV chargers that come pre-mounted.

4. Power may be reduced based on number of circuits, EV model and charger model.

5. Exact weight varies based on EV ARC™ model and options

6. Pressure calculated by weight distributed over 8in x 24in anti-skid pads

7. Enables domestic and international shipping on a standard flatbed trailer or shipping container
Vital Energy When and Where You Need It
EV ARC™ 2020 Specifications
Drive on Sunshine ™
Fastest Deployed Lowest TCOMost Scalable
Get the Charger Brand You Want
BeamForAll.com [email protected]
v1.82
[email protected] | 5660 Eastgate Drive,San Diego,CA 92121 EV Charging | Emergency Preparedness | Energy Resiliency EV ARC™ 2020
The EV ARC™ 2020 is a 100% off-grid solar-powered electric vehicle (EV) charging system that doubles as a mobile emergency preparedness and energy resiliency asset. During grid failure it continues to produce, store and deliver energy. The Transformer ARC™ design folds into a low-profile structure for ease of transport, providing vital energy where and when needed. • Mobile Energy
• Off Grid
• Rapid Deployment
• Emergency Power
• Easily Moved
• 100% Renewable
EV ARC™ 2020
“Transforms” into a low
profile for transport
[email protected] BeamForAll.com
ENVISIONSOLAR.COM | [email protected] | 5660 EASTGATE DRIVE,SAN DIEGO,CA 92121 Provide vital electricity during emergencies, disasters, power outages or in locations without a utility grid connection. Deliver total continuous power of 25A at 240V max. Emergency Power Panel is securely located on the upper enclosure and is accessible via a ladder.

Breakers
• 1 x 30A main 240V breaker
• 2 x 20A push to reset 120V breakers
• 1 x 240V NEMA L14 30 outlet (not GFCI protected)
• 2 x 120V NEMA 5-20 duplex (GFCI protected)
• 2 x 120V NEMA L5-20 outlet (twist lock, GFCI protected) Protection
• Lockable polycarbonate cover plate
• Cover plate serves as weather protection
• Padlock latch is universally compatible with standard locking mechanisms

EMERGENCY POWER PANEL SPECIFICATIONS
The EV ARC™ 2020 is a versatile energy infrastructure
product and is the only 100% renewable, movable, grid
independent EV charging option that fits in a standard park- ing space. It is uniquely suited to serve emergency prepar- edness needs of local, state, federal and military agencies. • Self contained EV/NEV charging station
• 4.3kW solar array with lithium ion battery storage
• Wind-rated up to 120 mph
• Flood-proof up to 9.5’
• BeamTrak™ sun tracking creates up to 25% more power
• Transportable for power where and when required
• Included in FEMA’s Authorized Equipment List (AEL)*
Clean, Quiet, Safe Power
No fueling. No emissions. No noise. No on-site liquid fuel storage or handling.
v1.5
EV Charging | Emergency Preparedness | Energy Resiliency EV ARC™ 2020
* EV ARC™ solar powered charging stations are included in the FEMA Authorized Equipment List, under designation 10BC 00 SOLR Chargers.

[email protected] BeamForAll.com
[email protected] | 5660 Eastgate Drive,San Diego,CA 92121 California Emergency Medical Services Authority (CAL EMSA) Runs Emergency Equipment Day and Night for 3-Day Training Operation Communications Hub
• ViaSat Satellite for Internet
• Monitoring camera
• Router, radio repeater
• Laptops, cell phones
Mobile Workstation
• 2 CB Radios
• Portable radio charger
• Lights
• ACU-M interoperability gateway
• Laptops, cell phones
Medical T ent and Ops T ent
• Medical tent with medical
equipment, air conditioning, lights
• Operations tent with communica-
tions hub, air conditioning, lighting
EV ARC™ Solar Microgrid Powers 3-Day
Anti- T errorist Field Training Exercise

CASE STUDY
Held on Alameda Island in California, CAL EMSA,
local police and urban search and rescue squads
held a three day training for first responders
focused on anti-terrorist readiness. Two EV ARC™
units were deployed to power field operations and
a field hospital. Each EV ARC™ had an Emergency
Power Panel (included in FEMA’s Authorized
Equipment List). Exercises included mock civilian
rescues and medical triage in various situations.

The two EV ARC™ units were combined to create
a 208V, three-phase, 12 kW microgrid for clean
quiet energy day and night. Replacing diesel
generators typically used eliminated the need to
store, transport and handle fuel, and eliminated
the noise, noxious fumes and fuel management.

Because EV ARC™ systems are portable and 100%
off grid, cities can build EV charging infrastructure,
energy resiliency and emergency preparedness
with EV ARC™ systems.

MISSION CRITICAL STATIONS POWERED:

ENVISIONSOLAR.COM | [email protected] | 5660 EASTGATE DRIVE,SAN DIEGO,CA 92121 Day Job: Faithful solar-powered electric vehicle
charging system. 100% off-grid.

Weekend Warrior: Mission-critical hero providing
electricity in emergencies, disasters, grid outages.

[email protected] BeamForAll.com
Single
Person Use
Easy
Stow/Unstow
Remote
Control Use
Rapid
Relocation
ARC Mobility™ Trailer
The Beam ARC Mobility™ trailer is specialized hydraulic transport equipment designed to rapidly relocate off-grid EV ARC™ 2020 sustainable EV charging systems. Remote controlled hydraulics enable one person to stow, transport, place and unstow EV ARC™ products. EV charging infrastructure has never been more scalable, flexible and resilient.

ARC Mobility™ Trailer for EV ARC™
Owners of Beam EV ARC™ sustainable off-grid EV
charging systems can relocate systems for events,
a move from leased properties, emergencies, a
change in EV driver patterns or simply because
they want them in a more optimal location. The
frame is powder-coated for long-lasting durability
and rust prevention with slip-resistant, grit-surface
decking for safety and ease of movement. The
ARC Mobility™ transport system is the fastest and
easiest way to relocate and redeploy off-grid solar-
powered EV ARC™ systems.

Rapidly Relocate and Redeploy EV ARC™ Systems
BeamForAll.com
[email protected]
T ools and Hardware
Full set of EV ARC™ deployment tools and hardware
for EV ARC™ stow and unstow
LED lighting package
7-Way RV blade electrical connector
2-5/16” ball adjustable pipe coupler (Gooseneck) or
height-adjustable 3” lunette ring (Pintle)
12V DC onboard hydraulic power unit and battery
Specs
Axles Tandem Dexter Torflex 10k Axles (20k total)
Wheels 17.5X6.75 Wheel .19 Inset Steel. 6,005lb capacity Tires Taskmaster Provider HD ST215 /75 R17.5 135N
Hydraulic Power Unit 12VDC 1.3GPM HPU with 5 gallon tank Hydraulic Fluid AW-32 Hydraulic Oil
Overall Length 26ft 8in
Overall Width 9ft 6in
Loaded Height 10ft 3in
Unloaded Height 7ft 3in (Gooseneck) 6ft 10in (Pintle)
Unloaded Weight 6,000lbs
Loaded Weight 16,000lbs
The fully integrated hydraulic system and ruggedized remote control make it easy for one operator to stow, transport and unstow EV ARC™ systems. Heavy duty suspension, self-adjusting electric brakes and tandem 10,000 lb axles provide smooth stable transport. The trailer includes a spare wheel and mount, and comes in gooseneck or pintle hitch configurations for powerful towing options.

A commercial driver’s license (CDL) is
required to tow an ARC Mobility™ trailer
that is loaded with an EV ARC™ system.

Durable, Industrial-Grade Transport System
ARC Mobility™ Trailer Specifications
Flexible ResilientScalable
EV ARC™ Systems When and Where You Need Them
BeamForAll.com [email protected]
v1.1
™
Drive on Sunshine ™

← All documents from this meeting