City of Cupertino, CA
Resolution 24-XXX
Fee Effective July 14, 2024
Schedule D - Table 1 Plan Check and Inspection Fees
Related IBC
Class
Building Use
(e.g., IBC Occupancy Type) Sq. Ft. Permit Tech
Cost
Plan Check
Cost
Inspection
Cost
Plan Check
Cost Inspection Cost
A Assembly 250 $117 $4,162 $3,918 $110.97 $116.14 1,250 $233 $5,271 $4,962 $110.97 $125.36
2,500 $233 $6,658 $6,529 $88.78 $4.67
5,000 $350 $8,878 $6,529 $22.19 $34.82
12,500 $350 $10,542 $9,141 $19.98 $30.18
25,000 $467 $13,039 $12,797 $52.16 $53.06
A A Occupancy Tenant Improvements 500 $233 $3,329 $3,918 $41.62 $76.96 2,500 $467 $4,162 $5,223 $44.39 $73.13
5,000 $467 $5,271 $7,052 $38.84 $4.67
10,000 $700 $7,213 $7,052 $7.40 $19.15
25,000 $700 $8,323 $9,924 $7.77 $16.60
50,000 $934 $10,265 $13,842 $20.53 $29.55
B Business 1,000 $233 $5,271 $5,746 $34.68 $51.54 5,000 $467 $6,658 $7,574 $38.84 $47.01
10,000 $467 $8,600 $9,924 $30.52 $25.84
20,000 $700 $11,652 $12,275 $6.47 $6.09
50,000 $700 $13,594 $14,103 $6.66 $11.44
100,000 $934 $16,923 $19,588 $16.92 $20.52
B B Occupancy Tenant Improvements 300 $117 $4,162 $3,134 $92.48 $118.55 1,500 $233 $5,271 $4,440 $92.48 $69.65
3,000 $233 $6,658 $5,485 $83.23 $3.89
6,000 $350 $9,155 $5,485 $15.41 $26.12
15,000 $350 $10,542 $7,835 $16.65 $19.93
30,000 $467 $13,039 $10,708 $43.46 $37.25
E Educational 100 $117 $4,162 $3,134 $277.43 $290.35 500 $233 $5,271 $4,179 $277.43 $313.40
1,000 $233 $6,658 $5,746 $249.69 $11.67
2,000 $350 $9,155 $5,746 $46.24 $78.35
5,000 $350 $10,542 $8,096 $49.94 $65.02
10,000 $467 $13,039 $11,230 $130.39 $116.97
E E Occupancy Tenant Improvements 100 $117 $3,052 $3,134 $208.08 $225.05 500 $233 $3,884 $3,918 $221.95 $261.17
1,000 $233 $4,994 $5,223 $166.46 $11.67
2,000 $350 $6,658 $5,223 $36.99 $69.65
5,000 $350 $7,768 $7,313 $38.84 $59.79
10,000 $467 $9,710 $10,186 $97.10 $106.52
F Factory Industrial 1,000 $233 $5,826 $6,007 $20.81 $45.01 5,000 $467 $6,658 $7,574 $33.29 $47.01
10,000 $467 $8,323 $9,924 $36.07 $25.84
20,000 $700 $11,930 $12,275 $5.55 $6.09
50,000 $700 $13,594 $14,103 $3.33 $11.44
100,000 $934 $15,259 $19,588 $15.26 $20.52
F F Occupancy Tenant Improvements 1,000 $233 $4,716 $4,701 $27.74 $45.01 5,000 $467 $5,826 $6,268 $33.29 $41.79
10,000 $467 $7,491 $8,357 $27.74 $2.33
20,000 $700 $10,265 $8,357 $5.55 $11.32
50,000 $700 $11,930 $11,753 $5.55 $9.87
100,000 $934 $14,704 $16,454 $14.70 $17.39
H High Hazard 100 $117 $5,826 $4,179 $346.79 $355.64 500 $233 $7,213 $5,485 $443.89 $313.40
1,000 $233 $9,433 $7,052 $332.92 $11.67
2,000 $350 $12,762 $7,052 $73.98 $95.76
5,000 $350 $14,981 $9,924 $72.13 $80.69
10,000 $467 $18,588 $13,842 $185.88 $143.09
H H Occupancy Tenant Improvements 100 $117 $3,329 $3,134 $208.08 $290.35 500 $233 $4,162 $4,179 $277.43 $313.40
1,000 $233 $5,549 $5,746 $194.20 $11.67
2,000 $350 $7,491 $5,746 $46.24 $78.35
5,000 $350 $8,878 $8,096 $38.84 $65.02
10,000 $467 $10,820 $11,230 $108.20 $116.97
I Institutional 500 $233 $6,658 $4,440 $83.23 $90.02 2,500 $467 $8,323 $6,007 $99.88 $73.13
5,000 $467 $10,820 $7,835 $77.68 $4.67
10,000 $700 $14,704 $7,835 $16.65 $22.63
25,000 $700 $17,201 $11,230 $16.65 $17.65
50,000 $934 $21,362 $15,409 $42.72 $32.69
I I Occupancy Tenant Improvements 100 $117 $4,162 $3,134 $277.43 $290.35 500 $233 $5,271 $4,179 $277.43 $261.17
1,000 $233 $6,658 $5,485 $249.69 $11.67
Base Cost1 Cost for each Add. 100 Sq. Ft.1,2
City of Cupertino, CA
Resolution 24-XXX
Fee Effective July 14, 2024
Schedule D - Table 1 Plan Check and Inspection Fees
2,000 $350 $9,155 $5,485 $46.24 $78.35
5,000 $350 $10,542 $7,835 $49.94 $59.79
10,000 $467 $13,039 $10,708 $130.39 $111.75
M Mercantile 2,000 $350 $7,768 $6,529 $27.74 $27.23 10,000 $700 $9,988 $8,357 $27.74 $28.73
20,000 $700 $12,762 $11,230 $22.19 $1.75
40,000 $1,050 $17,201 $11,230 $5.09 $7.84
100,000 $1,050 $20,253 $15,931 $4.99 $6.62
200,000 $1,400 $25,246 $22,200 $12.62 $11.80
M M Occupancy Tenant Improvements 300 $233 $3,329 $3,656 $69.36 $128.27 1,500 $467 $4,162 $4,962 $92.48 $104.47
3,000 $467 $5,549 $6,529 $64.73 $7.78
6,000 $700 $7,491 $6,529 $15.41 $31.92
15,000 $700 $8,878 $9,402 $12.95 $24.19
30,000 $934 $10,820 $12,797 $36.07 $45.77
R-1 Residential—Hotels & Motels 3,000 $350 $9,155 $7,574 $20.81 $22.51 15,000 $700 $11,652 $9,924 $22.19 $20.89
30,000 $700 $14,981 $13,059 $17.57 $1.17
60,000 $1,050 $20,253 $13,059 $3.70 $6.09
150,000 $1,050 $23,582 $18,543 $3.88 $5.11
300,000 $1,400 $29,408 $25,856 $9.80 $9.09
R-2 Residential—Apartment Building 800 $233 $7,213 $6,007 $60.69 $64.43 4,000 $467 $9,155 $7,835 $69.36 $58.76
8,000 $467 $11,930 $10,186 $52.02 $2.92
16,000 $700 $16,091 $10,186 $11.56 $17.41
40,000 $700 $18,865 $14,364 $11.79 $14.95
80,000 $934 $23,582 $20,110 $29.48 $26.30
R-2 Residential—Apartment Building 800 $233 $277 $6,007 $0.00 $64.43 - Repeat Unit 4,000 $467 $277 $7,835 $0.00 $58.76 8,000 $467 $277 $10,186 $0.00 $2.92
16,000 $700 $277 $10,186 $1.16 $17.41
40,000 $700 $555 $14,364 $0.00 $14.95
80,000 $934 $555 $20,110 $0.69 $26.30
R-3 Dwellings—Custom Homes, Models, 1,000 $233 $5,271 $6,268 $18.50 $52.23 First Master Plan 2,500 $233 $5,549 $7,052 $73.98 $52.23 4,000 $233 $6,658 $7,835 $13.87 $76.96
6,000 $467 $6,936 $9,141 $55.49 $26.12
8,000 $467 $8,046 $9,663 $13.87 $76.96
10,000 $700 $8,323 $10,969 $83.23 $116.69
R-3 Dwellings—Production Phase 1,000 $117 $555 $4,440 $0.00 $112.25 of Master Plan (Repeats) 2,500 $233 $555 $6,007 $18.50 $121.88 4,000 $233 $832 $7,835 $13.87 $11.67
6,000 $467 $1,110 $7,835 $13.87 $169.76
8,000 $467 $1,387 $11,230 $13.87 $220.61
10,000 $700 $1,665 $15,409 $16.65 $161.09
R-3 Group Care 1,000 $233 $6,104 $6,007 $41.62 $58.07 5,000 $467 $7,768 $8,096 $44.39 $47.01
10,000 $467 $9,988 $10,447 $36.07 $2.33
20,000 $700 $13,594 $10,447 $7.40 $14.80
50,000 $700 $15,814 $14,887 $7.77 $11.96
100,000 $934 $19,698 $20,632 $19.70 $21.57
R R Occupancy Tenant Improvements 80 $233 $2,497 $3,395 $173.40 $326.46 400 $233 $3,052 $4,440 $208.08 $326.46
800 $233 $3,884 $5,746 $173.40 $29.18
1,600 $467 $5,271 $5,746 $34.68 $108.82
4,000 $467 $6,104 $8,357 $41.62 $77.66
8,000 $700 $7,768 $11,230 $97.10 $149.13
S Storage 600 $233 $4,716 $4,179 $57.80 $64.14 3,000 $467 $6,104 $5,485 $55.49 $60.94
6,000 $467 $7,768 $7,313 $46.24 $3.89
12,000 $700 $10,542 $7,313 $9.25 $17.41
30,000 $700 $12,207 $10,447 $10.17 $13.84
60,000 $934 $15,259 $14,364 $25.43 $25.50
S S Occupancy Tenant Improvements 600 $233 $3,884 $3,918 $46.24 $64.14 3,000 $467 $4,994 $5,223 $46.24 $60.94
6,000 $467 $6,381 $7,052 $36.99 $3.89
12,000 $700 $8,600 $7,052 $7.71 $15.96
30,000 $700 $9,988 $9,924 $8.32 $13.84
60,000 $934 $12,485 $13,842 $20.81 $24.63
U Accessory 40
200
400
City of Cupertino, CA
Resolution 24-XXX
Fee Effective July 14, 2024
Schedule D - Table 1 Plan Check and Inspection Fees
800
1,000 $233 $2,219 $3,656 $27.74 $168.37
2,000 $350 $2,497 $5,223 $41.62 $110.30
4,000 $467 $3,329 $7,313 $83.23 $194.49
Standard Comm. Foundation 500 $233 $2,774 $3,918 $27.74 $76.96 w/o Podium 2,500 $467 $3,329 $5,223 $44.39 $62.68 5,000 $467 $4,439 $6,790 $33.29 $4.67
10,000 $700 $6,104 $6,790 $5.55 $19.15
25,000 $700 $6,936 $9,663 $6.66 $15.56
50,000 $934 $8,600 $13,320 $17.20 $28.51
Standard Comm. Foundation 500 $233 $3,052 $4,179 $41.62 $76.96 with Podium 2,500 $467 $3,884 $5,485 $44.39 $73.13 5,000 $467 $4,994 $7,313 $33.29 $4.67
10,000 $700 $6,658 $7,313 $7.40 $20.89
25,000 $700 $7,768 $10,447 $7.77 $16.60
50,000 $934 $9,710 $14,364 $19.42 $30.60
All Shell Buildings 500 $233 $3,329 $3,656 $41.62 $76.96 2,500 $467 $4,162 $4,962 $55.49 $62.68
5,000 $467 $5,549 $6,529 $38.84 $4.67
10,000 $700 $7,491 $6,529 $9.25 $19.15
25,000 $700 $8,878 $9,402 $7.77 $14.51
50,000 $934 $10,820 $12,797 $21.64 $27.46
1 At Building Permit submittal, a Planning Division Review fee of 20% shall be collected (see Table 3 - Misc. Items) 2 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.

FY 2023-24 FY 2023-24 FY 2024-25
FEE DESCRIPTION UNIT Fee Total Cost Prop. Fee YOY $ ▲ YOY % ▲

STAND ALONE M/E/P PERMIT FEES
Travel and Documentation each $82
Permit Issuance each $62

MECHANICAL FEES
Mechanical Permit Fee per hour $82 $263 $266 184.00 224.4% Stand Alone Mechanical Plan Check (hourly rate) per hour $243 $263 $266 23.00 9.5% Other Mechanical Inspections (hourly rate) per hour $243 $263 $266 23.00 9.5% MECHANICAL UNIT FEES:

Install/Relocate forced air furnace or burner (including attached ducts and vents) up to and including 100,000 Btu/h (each)
up to and including 100,000 Btu/h each $243
over 100,000 Btu/h each $243
Install/Relocate floor furnace, including vent (each) each $121 Install or relocate suspended heater, recessed wall heater, or floor-mounted unit Residential each $121
Commercial each $243
Install, relocate or replace appliance vent installed and not included in an appliance permit
Residential each $121
Commercial each $243
Repair/Alter/Add heating appliance, refrigeration unit, cooling unit, absorption unit, mini-split system/heat pump, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls and/or ducts Residential each $121
Commercial each $243
Install or relocate boiler or compressor
up to and including 3HP, or absorption system up to and including 100,000 each $243 over 3HP and up to and including 15 HP, or absorption system over 100,000 Btu/h and up to and including 500,000 Btu/h each $243
over 15 HP and up to and including 30 HP, or absorption system over 500,000 Btu/h and up to and including 1,000,000 Btu/h each $305

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees FY 2023-24 FY 2023-24 FY 2024-25
FEE DESCRIPTION UNIT Fee Total Cost Prop. Fee YOY $ ▲ YOY % ▲

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees over 30 HP and up to and including 50 HP, or absorption system over 1,000,000 Btu/h and up to and including 1,750,000 Btu/h each $305 over 50 HP, or absorption system over 1,750,000 Btu/h each $364 Air-handling unit, including attached ducts. (Note: this fee shall not apply to an air- handling unit that is a portion of a factory-assembled appliance, cooling unit, evaporative cooler, or absorption unit for which a permit is required elsewhere) Residential each $121
Commercial each $364
Air-handling unit over 10,000 CFM each $243
Ventilation fan connected to a single duct each $121
Ventilation system that is not a portion of any heating or air-conditioning system authorized by a permit each $182
Install or relocate HVAC system or portion there of
Residential each $259 $261
Commercial each $388 $392
Hood installation that is served by mechanical exhaust, including the ducts for such hood
Residential each $121 $129 $131 10.00 8.3%
Commercial each $364 $517 $522 158.00 43.4%
Any other piece of equipment or appliance not listed in Mechanical schedule.

Appliance or piece of equipment not classed in other appliance categories, or for which no other fee is listed
each $182 $259 $261 79.00 43.4%
Electrical Permit Fee per hourEach $82 $263 $266 184.00 224.4% Electrical Plan Check per hour $243 $263 $266 23.00 9.5% Electrical Inspections per hour $243 $263 $266 23.00 9.5% ELECTRICAL UNIT FEES:

Residential Whole-House Rewire (up to 2500 sq ft) each $486 $517 $522 36.00 7.4% Each Additional 1000 sq ft each 1,000 sf $243 $259 $261 18.00 7.4% Receptacle, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters
First 20 first 20 $82 $86 $87 5.00 6.1%
Each Additional each $7 $9 $9 2.00 28.6%

ELECTRICAL FEES
FY 2023-24 FY 2023-24 FY 2024-25
FEE DESCRIPTION UNIT Fee Total Cost Prop. Fee YOY $ ▲ YOY % ▲

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees Lighting fixtures, sockets, or other lamp-holding devices First 20 first 20 $121 $129 $131 10.00 8.3%
Each Additional each $9 $9 $9 0.00 0.0%
Pole or platform-mounted lighting fixtures each $26 $30 $30 4.00 15.4% Theatrical-type lighting fixtures or assemblies each $24 Appliances (Install / Repair / Replace)
Residential each $44 $44
Commercial each $85 $86
Fixed residential appliances or receptacle outlets for same, including wall- mounted electric ovens; counter mounted cooking tops; electric ranges; self- contained room console or through-wall air conditioners; space heaters; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; or other motor-operated appliances not exceeding one horsepower (HP) in rating
each $40
Residential appliances and self-contained factory-wired, nonresidential appliances not exceeding one horsepower (HP), kilowatt (kW), or kilovolt- ampere (kVA) in rating, including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment each $82
Power Apparatus - Generator/Transformer or Similar (Install/Repair/Replace) Residential each $259 $261
Commercial each $388 $392
Motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus. Rating in horsepower (HP), kilowatts (kW), or kilovolt-amperes (kVA), or kilovolt-amperes-reactive (kVAR) each $243
Busways
Trolley and plug-in-type busways each 100 lf $121
Signs, Outline Lighting, and Marquees
Supplied from one branch circuit each $82
Additional branch circuits within the same sign, outline lighting system, or marquee each $40
Services (including Temporary Power)
600 volts or less, up to 200 amperes in rating each $82 $86 $87 5.00 6.1% 600 volts or less, 201 to 1000 amperes in rating each $121 $259 $261 140.00 115.7% Over 600 volts or over 1000 amperes in rating each $243 $388 $392 149.00 61.3% Any other Electrical apparatus, conduits, and conductors not listed in Electrical Schedule. Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is herein set forth
each $243 $259 $261 18.00 7.4%
FY 2023-24 FY 2023-24 FY 2024-25
FEE DESCRIPTION UNIT Fee Total Cost Prop. Fee YOY $ ▲ YOY % ▲

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees

PLUMBING/GAS FEES
Plumbing/Gas Permit Fee per hourEach $82 $263 $266 184.00 224.4% Stand Alone Plumbing Plan Check per hourEach $243 $263 $266 23.00 9.5% Other Plumbing and Gas Inspections per hourEach $243 $263 $266 23.00 9.5% PLUMBING/GAS UNIT FEES:

Residential Whole-House Water Re-Pipelumbing (up to 2500 sq ft) each $486 $517 $522 36.00 7.4% Each Additional 1000 sq ft each 1,000 sf $243 $259 $261 18.00 7.4% Plumbing fixture or trap or set of fixtures on one trap, including water, drainage piping, and backflow protection each $16
Building sewer lateral (Install / Repair / Replace) or sewer clean-out Residential each $62 $65 $65 3.00 4.8%
Commercial each $121 $129 $131 10.00 8.3%
Sewer Clean-out (Install/Repair/Replace)
Residential each $65 $65
Commercial each $129 $131
Building Drain/Waste/Vent Repair
Residential per fixture $18 $18
Commercial per fixture $26 $26
Rainwater system inside building per drain $16
Private sewage disposal system each $243
Water Heater Replacement / Installation - All Types (Gas or Solar) and/or Vent Residential each $62 $65 $65 3.00 4.8%
Commercial each $182 $194 $196 14.00 7.7%
Industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps Interceptors - Grease/Sand (Install/Repair/Replace)
each $182 $194 $196 14.00 7.7%
Install, alter or repair water piping and/or water treating equipment Water Treatment System (Install/Repair/Replace) each $82 $86 $87 5.00 6.1% Repair/Alter drainage or vent piping each fixture $82
Lawn sprinkler system on any one meter, including backflow protection devices each $121 Backflow devices not included in other fee services (e.g., building/trailer park each $121 Atmospheric-type vacuum breakers not included in other fee services (e.g., building/trailer park sewer) each 5 $121
Gas piping (Install/Repair/Replace) system per outlet each 4 $121 $129 $131 10.00 8.3% Water Service Install or Replace Water Meter / Service each $62 $65 $65 3.00 4.8% Partial Water Re-pipe
Residential per fixture $24 $26 $26 2.00 8.3%
Commercial per fixture $15 $17 $17 2.00 13.3%
Any other device/fixture not listed in Plumbing Schedule (Install/Repair/Replace) each $129 $131 Work Item Unit FY 2023-24 Fee FY 2023-24
Total Cost
FY 2024-25
Proposed Fee YOY $ ▲ YOY % ▲
Standard Hourly Rate - Building Per hour $243 $263 $266 23.00 9.5% Accessibility Hardship Exemption 1 hour Each $243 $275 $277 34.00 14.0% Acoustical Review
Single Family Home/Duplex—New Each $608 $649 $655 47.00 7.7% Single Family Home/Duplex—Addition/Alteration Each $364 $382 $386 22.00 6.0% Multi-Family/Commercial Each $608 $649 $655 47.00 7.7%
Additions (Non Hillside R3 Occupancy) - Plan Check Fees Plan Check Fees (up to 250 sq. ft.) up to 250 sf Each $487 $2,428 $1,159 672.00 138.0% Plan Check Fees (251 - 499 sq. ft.) 251-499 sf Each $971 $4,625 $2,236 1,265.00 130.3% Plan Check Fees (500-999 sq. ft.) Each $5,724 $2,767
Additions (Non Hillside R3 Occupancy) - Inspection Fees Inspection Fees (up to 250 sq. ft.) up to 250 sf Each $1,213 $3,103 $1,874 661.00 54.5% Inspection Fees (251 - 499 sq. ft.) 251-499 sf Each $1,456 $4,137 $2,392 936.00 64.3% Inspection Fees (500-999 sq. ft.) Each $5,171 $2,990
Accessory Buildings - Residential
Accessory Buildings (Up to 499 sq. ft.) Each $1,699 $1,716 Accessory Buildings (500 - 999 sq. ft.) Each $2,491 $2,516 Accessory Dwelling Unit (ADU) - Plan Check Fees
Plan Check Fees (up to 499 sq. ft.) up to 499 sf Each $971 $2,428 $2,453 1,482.00 152.6% Plan Check Fees (500 - 999 sq. ft.) 500-999 sf Each $1,940 $3,527 $3,563 1,623.00 83.7% Accessory Dwelling Unit (ADU) - Inspection Fees
Inspection Fees (up to 499 sq. ft.) up to 499 sf Each $1,456 $2,585 $2,612 1,156.00 79.4% Inspection Fees (500 - 999 sq. ft.) 500-999 sf Each $2,423 $3,620 $3,656 1,233.00 50.9% Address Assignment Per hour $243 $231 $233 (10.00) -4.1% Board of Appeals Per hour $243 $263 $266 23.00 9.5%
Clerical Fee 1/2 hour $121 $116 $117 (4.00) -3.3%
Alternate Materials and Methods of Construction Per hour $243 $253 $255 12.00 4.9% Antenna—Telecom Facility
Radio Each $608 $454 $458 (150.00) -24.7%
Cellular/Mobile Phone, alterations to existing facility Each $486 $649 $655 169.00 34.8% Cellular/Mobile Phone, free-standing Each $1,335 $2,248 $2,271 936.00 70.1% Cellular/Mobile Phone, attached to building Each $1,094 $1,182 $1,194 100.00 9.1% Arbor/Trellis Each $487 $649 $655 168.00 34.5%
Awning/Canopy (supported by building) Each $487 $649 $655 168.00 34.5% Balcony Addition Each $1,094 $1,572 $1,588 494.00 45.2% Battery Energy Storage System up to three (3) $243 $649 $655 412.00 169.5% Each Additional Each $121 $382 $386 265.00 219.0%
Below Market Rate
Escrow Inspection % of Sale Price 0.52% 0.52%
Carport Each $850 $907 $916 66.00 7.8%
Certifications
Special Inspector Qualifications (initial review) Each $487 $506 $511 24.00 4.9% Special Inspector Qualifications (renewal / update) Each $243 $231 $233 (10.00) -4.1% Chimney (new) Each $729 $907 $916 187.00 25.7%
Chimney Repair Each $487 $511 $517 30.00 6.2%

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Work Item Unit FY 2023-24 Fee FY 2023-24
Total Cost
FY 2024-25
Proposed Fee YOY $ ▲ YOY % ▲

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Close Existing Openings
Interior wall Each $486
Exterior wall Each $729
Commercial Coach (per unit) Each $1,094 $1,182 $1,194 100.00 9.1% Covered Porch Each $850 $907 $916 66.00 7.8%
Deck (wood) Each $850 $907 $916 66.00 7.8%
Deck Railing Each $487 $511 $517 30.00 6.2%
Deferred Submittal (2 hour minimum) based on work item $255 $266 Demolition
Multi-Family and Commercial (up to 3,000 sf) Each base $608 $764 $772 164.00 27.0% Multi-Family and Commercial (each additional 3,000 sf) Each 3,000 sf $243 $267 $269 26.00 10.7% Residential (R-3 Occ) (up to 3,000 sf) Each base $487 $764 $772 285.00 58.5% Residential (R-3 Occ) (each additional 3,000 sf) Each 3,000 sf $243 $267 $269 26.00 10.7% Swimming Pool Residential Each $487 $511 $517 30.00 6.2% Swimming Pool Multi-Family and Commercial (up to 3,000 sf) Each base $729 $770 $778 49.00 6.7% Swimming Pool Multi-Family and Commercial (each additional 3,000 sf) Each 3,000 sf $243 $259 $261 18.00 7.4% Disabled Access Compliance Inspection Per hour $243 $263 $266 23.00 9.5% Door
New door (non structural) Each $364 $382 $386 22.00 6.0% New door (structural shear wall/masonry) Each $487 $649 $655 168.00 34.5% Duplicate / Replacement Job Card Each $121 $116 $117 (4.00) -3.3% Electric Vehicle Charging Station Each $243 $382 $266 23.00 9.5% Extensions
Plan Check Applications (within 180 days of Submittal) 1 hour $243 $263 $266 23.00 9.5% Permits (within 180 days of Issuance)
Start construction, without plans 1/2 hour $121 $137 $139 18.00 14.9% Resume or complete construction, without plans 1/2 hour $121 $137 $139 18.00 14.9% Start construction, with plans 1 hour $243 $275 $277 34.00 14.0% Resume or complete construction, with plans 2 hours $486 $549 $555 69.00 14.2% Fence
Non-masonry, over 7 feet in height up to 100 l.f. $487 $511 $517 30.00 6.2% Non-masonry, each additional 100 l.f. Each 100 l.f. $121 $129 $131 10.00 8.3% Masonry, over 7 feet in height up to 100 l.f. $850 $907 $916 66.00 7.8% Masonry, each additional 100 l.f. Each 100 l.f. $487 $517 $522 35.00 7.2% Fireplace
Masonry Each $850 $907 $916 66.00 7.8%
Pre-Fabricated/Metal Each $487 $511 $517 30.00 6.2%
Flag pole (over 20 feet in height) Each $487 $511 $517 30.00 6.2% Foundation Repair Each $1,094 $1,166 $1,178 84.00 7.7%
Work Item Unit FY 2023-24 Fee FY 2023-24
Total Cost
FY 2024-25
Proposed Fee YOY $ ▲ YOY % ▲

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Garage / Agricultural Buildings
Wood frame up to 1,000 sf Each $1,577
Masonry up to 1,000 sf Each $2,066
Green Building Deposit - Third Party Certification Process Single-Family Residential sf $2/sf, $1,000 max.
2/sf, $20,000 min;
$40,000 max.
2/sf, $35,000 min;
$75,000 max.

Inspections
Pre-Inspection Fee Per hour $243 $263 $266 23.00 9.5%
Standard Inspection Hourly Rate Per hour $243 $263 $266 23.00 9.5% Progress Inspection Per hour $243 $263 $266 23.00 9.5%
Partial Inspection Per hour $243 $263 $266 23.00 9.5%
Courtesy Inspection - 2 hour minimum Per hour 486 or 2 hr min. $256 $266 23.00 9.5% Cancelled inspection w/out advance notice 1 Per hour $243 $256 $266 23.00 9.5% Reinspection 1 Per hour $243 $256 $266 23.00 9.5%
Outside of normal business hours (24 hour minimum) Per hour 486 or 2 hr min. $305 $308 65.00 26.7% Inspection Supplemental Fee (Projects that require more inspections than average, the Building Official may charge additional inspection fees) First 1/2 hour minimum first 1/2 hour $121 $129 $131 10.00 8.3% Each Additional hour Per hour $243 $259 $261 18.00 7.4% Life Safety Report Each $1,456
Lighting pole Each $608 $649 $655 47.00 7.7%
each additional pole Each $243 $267 $269 26.00 10.7%
Modular Structures Each $1,094 $923 $933 (161.00) -14.7% Modification of Technical Code 1 hour $243 $263 $266 23.00 9.5% Occupancy
Certificate of Occupancy/Completion Each $487 $511 $517 30.00 6.2% Temporary Occupancy Permit Per six months $487 $511 $517 30.00 6.2% Partition—Commercial, Interior (up to 30 l.f.) up to 30 l.f. $729 $778 $786 57.00 7.8% Additional partition Each 30 l.f. $243 $259 $261 18.00 7.4% Partition—Residential, Interior (up to 30 l.f.) up to 30 l.f. $487 $511 $517 30.00 6.2% Additional partition Each 30 l.f. $121 $259 $261 140.00 115.7% Patio Cover / Gazebo
Wood frame up to 300 sf $584 $923 $933 349.00 59.8%
Metal frame up to 300 sf $584 $923 $933 349.00 59.8%
Other frame up to 300 sf $816 $923 $933 117.00 14.3%
Additional patio Each 300 sf $350 $396 $400 50.00 14.3% Enclosed prefabricated Sun Room up to 300 sf $816 $907 $916 100.00 12.3% Additional Sun Rooms Each 300 sf $467
Non-Residential sf
Multi-Family Residential sf
Work Item Unit FY 2023-24 Fee FY 2023-24
Total Cost
FY 2024-25
Proposed Fee YOY $ ▲ YOY % ▲

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Photovoltaic System
Residential:

Systems up to 15kW Each $427 $450 $450 23.00 5.4%
Each Additional kW Above 15kW Each Addl kW $15 $15
Multi-Family and Commercial:

Multi-Family Res/Commercial, up to 8 kilowatts Systems up to 50kW up to 8 kW Each $608 $1,000 $1,000 392.00 64.5% Multi-Family Res/Commercial, each additional 1 kilowatt Each 1 addl kW $62 $7 $7 (55.00) -88.7% Each Additional kW Above 250kW Each addl kW $5 $5
Thermal System
Residential:

Systems up to 10kW Each $450 $450
Each Additional kW Above 10kW Each addl kW $15 $15
Multi-Family and Commercial:

Systems up to 30kW Each $1,000 $1,000
Each Additional kW between 30kW and 260kW Each addl kW $7 $7 Each Additional kW Above 260kW Each addl kW $5 $5
Pile Foundation
Cast in Place Concrete (first 10 piles) up to 10 $1,094 $1,182 $1,194 100.00 9.1% Additional Piles (increments of 10) Each 10 $729 $792 $800 71.00 9.7% Driven (steel, pre-stressed concrete) up to 10 $1,094 $1,182 $1,194 100.00 9.1% Additional Piles (increments of 10) Each 10 $729 $792 $800 71.00 9.7% Product Review Per hour $243 $253 $255 12.00 4.9%
Plan Review
Standard Plan Review Hourly Rate Per hour $243 $275 $277 34.00 14.0% Overtime Plan Review (2 4 hour minimum) Per hour 486 or 2 hr min. $321 $325 82.00 33.7% Pre-Submittal Plan Review (2 hour minimum) Per hour 486 or 2 hr min. $275 $277 34.00 14.0% Expedited Plan Review Each 1.5x Plan
Check Fee

1.5x Plan
Check Fee
Plan Review Supplemental Fee (after 2nd review)
First 1/2 hour minimum first 1/2 Per hour $121 $275 $278 157.00 129.8% Each Additional hour Per hour $243
Pre-Construction Meeting Each $460 $446 $450 (10.00) -2.2% Remodel—Residential
Kitchen (up to 300 sq. ft.) up to 300 sf Each $971 $1,028 $1,039 68.00 7.0% Bath (up to 300 sq. ft.) up to 300 sf Each $971 $1,028 $1,039 68.00 7.0% Other Remodel (up to 300 sq. ft.) up to 300 sf Each $729 $907 $916 187.00 25.7% Additional remodel (per sq. ft. above 300) Each 300 sf Per sf $364 $2.26 $2.29 (361.71) -99.4% Other Remodel (1000 sq. ft.) 1000 sfEach $2,308 $2,491 $2,516 208.00 9.0% Additional remodel (per sq. ft. above 1000) Each 300 sf Per sf $364 $0.53 $0.53 (363.47) -99.9% Other Remodel (2500+ sq. ft.) 2500 sfEach $3,037 $3,282 $3,316 279.00 9.2% Additional remodel (per sq. ft. above 2500) Each 300 sf Per sf $364.00 $0.26 $0.27 (363.73) -99.9% Re-roof
Residential (maximum $500 per building) Each 100 sf $26 $25 $25 (1.00) -3.8% Multi-Family Dwelling (maximum $500 per building) Each 100 sf $26 $25 $25 (1.00) -3.8% Commercial
Commercial (first 5,000 sf) Each $608 $633 $639 31.00 5.1% Commercial (each additional 2,500 sf) Each 2,500 sf $243 $259 $261 18.00 7.4% Retaining Wall (concrete or masonry)
Standard (up to 50 l.f.) up to 50 l.f. $1,094 $1,182 $1,194 100.00 9.1% Additional retaining wall Each 50 l.f. $729 $792 $800 71.00 9.7% Special Design, 3-10' high (up to 50 l.f.) up to 50 l.f. $1,577 $1,715 $1,733 156.00 9.9% Additional retaining wall Each 50 l.f. $971 $1,050 $1,061 90.00 9.3% Special Design, over 10' high (up to 50 l.f.) up to 50 l.f. $1,821 $1,974 $1,994 173.00 9.5% Additional retaining wall Each 50 l.f. $1,213 $1,309 $1,322 109.00 9.0% Work Item Unit FY 2023-24 Fee FY 2023-24
Total Cost
FY 2024-25
Proposed Fee YOY $ ▲ YOY % ▲

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Gravity/Crib Wall, 0-10' high (up to 50 l.f.) up to 50 l.f. $1,577 $1,715 $1,733 156.00 9.9% Additional Gravity/Crib Wall Each 50 l.f. $971 $1,050 $1,061 90.00 9.3% Gravity/Crib Wall, over 10' high (up to 50 l.f.) up to 50 l.f. $1,821 $1,974 $1,994 173.00 9.5% Additional Gravity/Crib Wall Each 50 l.f. $1,213 $1,309 $1,322 109.00 9.0% Revisions Per hour $608 $259 $266
Commercial (New and Tenant Improvement) Each $1,094
Single Family Dwelling (New and Additions) Each $608
Remodel Each $487
Sauna—steam Each $850 $907 $916 66.00 7.8%
Siding
Stone and Brick Veneer (interior or exterior) up to 400 sf $608 $633 $639 31.00 5.1% All Other up to 400 sf $487 $503 $508 21.00 4.3%
Additional siding Each 400 sf $121 $129 $131 10.00 8.3% Signs
Directional Each $487 $511 $517 30.00 6.2%
Each additional Directional Sign Each $243 $267 $269 26.00 10.7% Ground/Roof/Projecting Signs Each $487 $511 $517 30.00 6.2% Master Plan Sign Check Each $487 $511 $517 30.00 6.2%
Rework of any existing Ground Sign Each $487 $511 $517 30.00 6.2% Other Sign Each $487 $511 $517 30.00 6.2%
Reinspection Fee Each $121 $122 $124 3.00 2.5%
Wall/Awning Sign, Non-Electric Each $364 $382 $386 22.00 6.0% Wall/Awning Sign, Electric Each $364 $511 $517 153.00 42.0% Shed over 120 square feet Each $1,094
Skylight
50 sf or less (cumulative area) Each $608 $511 $517 (91.00) -15.0% Greater than 50 sf or structural Each $850 $267 $269 (581.00) -68.4% Stairs—First Flight first flight Each $487 $511 $517 30.00 6.2% Each additional flight Per flightEach addl $243 $267 $269 26.00 10.7% Storage Racks
0-8' high (up to 100 l.f.) first 100 l.f. $608 $649 $655 47.00 7.7% each additional 100 l.f. Each 100 l.f. $121 $129 $131 10.00 8.3% over 8' high (up to 100 l.f.) first 100 l.f. $608 $778 $786 178.00 29.3% each additional 100 l.f. Each 100 l.f. $121 $129 $131 10.00 8.3% Stucco Applications
Base up to 400 sf $487 $503 $508 21.00 4.3%
Additional Stucco Application Each 400 sf $121 $129 $131 10.00 8.3% Work Item Unit FY 2023-24 Fee FY 2023-24
Total Cost
FY 2024-25
Proposed Fee YOY $ ▲ YOY % ▲

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Swimming Pool/Spa
Vinyl-lined Each $1,094 $1,182 $1,194 100.00 9.1%
Fiberglass Each $1,094 $1,182 $1,194 100.00 9.1%
Gunite (up to 800 sf) Each $1,577 $1,699 $1,716 139.00 8.8% Additional pool (over 800 sf) Each 100 sf $364 $396 $400 36.00 9.9% Commercial pool (up to 800 sf) Each $2,672 $2,881 $2,910 238.00 8.9% Additional pool (over 800 sf) Each 100 sf $729 $792 $800 71.00 9.7% Spa or Hot Tub (Pre-fabricated) Each $487 $511 $517 30.00 6.2% Technology Fee Per Permit 5.8% 5.8%
Temporary Structures Each $729 $778 $786 57.00 7.8%
Tenant Improvement Preparation Each $487 $511 $517 30.00 6.2% Window or Sliding Glass Door
Replacement (first 8 windows) first 8 $364 $374 $378 14.00 3.8% Replacement (each additional 8 windows) Each 8 $121 $129 $131 10.00 8.3% New Window (non structural) Each $305 $320 $324 19.00 6.2% New window (structural shear wall/masonry) Each $426 $454 $458 32.00 7.5% Bay Window (structural) Each $426 $454 $458 32.00 7.5% Planning Department Review fee (New Construction and Additions) (Payable at permit submittal) Each
20% of plan
review and
inspection fees
20% of plan
review and
inspection fees
Planning Hourly Rate (Misc Reviews) Per hour Refer to
Schedule C
Refer to
Schedule C
Housing Mitigation In-lieu fees (Payable at Building Permit issuance) Per sq. ft. Refer to Schedule C
Refer to
Schedule C
Zoning, Planning, Municipal Code fees (Payable at Building Permit issuance) Per sq. ft. Refer to Schedule C
Refer to
Schedule C
Wireless Master Plan fee (Payable at Building Permit issuance) Each Refer to Schedule C
Refer to
Schedule C
Refunds - Plan Check Fees
1st review not started (within 3 Business of Submittal) 100% of Plan Review Fees 100% of Plan Review Fees Plan review more than 3 Business Days after the Date of Submittal No refund No refund Refunds - Building Permit Fees
No inspections and permit is active (not expired) 80% of permit fees 80% of permit fees No inspections and permit is expired No refund No refund Inspections were provided No refund No refund
Work without permit - based on current permit and plan check fees Double fees Double fees NOTE:

Fee Adjustments: In instances where the strict application of fees from this schedule would constitute a substantial inequity to an applicant or to the City, the Chief Building Official shall be authorized to adjust such fees on a case-by-case basis. Any such adjustments shall be recorded in writing and entered into the appropriate files.

Fees identified in this Table consist of 50% Plan Review Fee and 50% Inspection Fee