Cities Index.
H – FY 2024-25 Proposed Fee Schedule D – Building (Clean)

Cupertino City Council
May 14, 2024

Document
H – FY 2024-25 Proposed Fee Schedule D – Building (Clean)
Meeting
May 14, 2024
Body
Cupertino City Council
Original file
272 KB
Text extracted from the city's file for reading and search. Open the original on legistar.granicus.com. That file is the official record.

City of Cupertino, CA
Resolution 24-XXX
Fee Effective July 14, 2024
Schedule D - Table 1 Plan Check and Inspection Fees
Related IBC
Class
Building Use
(e.g., IBC Occupancy Type) Sq. Ft. Permit Tech
Cost
Plan Check
Cost
Inspection
Cost
Plan Check
Cost Inspection Cost
A Assembly 250 $117 $4,162 $3,918 $110.97 $116.14 1,250 $233 $5,271 $4,962 $110.97 $125.36
2,500 $233 $6,658 $6,529 $88.78 $4.67
5,000 $350 $8,878 $6,529 $22.19 $34.82
12,500 $350 $10,542 $9,141 $19.98 $30.18
25,000 $467 $13,039 $12,797 $52.16 $53.06
A A Occupancy Tenant Improvements 500 $233 $3,329 $3,918 $41.62 $76.96 2,500 $467 $4,162 $5,223 $44.39 $73.13
5,000 $467 $5,271 $7,052 $38.84 $4.67
10,000 $700 $7,213 $7,052 $7.40 $19.15
25,000 $700 $8,323 $9,924 $7.77 $16.60
50,000 $934 $10,265 $13,842 $20.53 $29.55
B Business 1,000 $233 $5,271 $5,746 $34.68 $51.54 5,000 $467 $6,658 $7,574 $38.84 $47.01
10,000 $467 $8,600 $9,924 $30.52 $25.84
20,000 $700 $11,652 $12,275 $6.47 $6.09
50,000 $700 $13,594 $14,103 $6.66 $11.44
100,000 $934 $16,923 $19,588 $16.92 $20.52
B B Occupancy Tenant Improvements 300 $117 $4,162 $3,134 $92.48 $118.55 1,500 $233 $5,271 $4,440 $92.48 $69.65
3,000 $233 $6,658 $5,485 $83.23 $3.89
6,000 $350 $9,155 $5,485 $15.41 $26.12
15,000 $350 $10,542 $7,835 $16.65 $19.93
30,000 $467 $13,039 $10,708 $43.46 $37.25
E Educational 100 $117 $4,162 $3,134 $277.43 $290.35 500 $233 $5,271 $4,179 $277.43 $313.40
1,000 $233 $6,658 $5,746 $249.69 $11.67
2,000 $350 $9,155 $5,746 $46.24 $78.35
5,000 $350 $10,542 $8,096 $49.94 $65.02
10,000 $467 $13,039 $11,230 $130.39 $116.97
E E Occupancy Tenant Improvements 100 $117 $3,052 $3,134 $208.08 $225.05 500 $233 $3,884 $3,918 $221.95 $261.17
1,000 $233 $4,994 $5,223 $166.46 $11.67
2,000 $350 $6,658 $5,223 $36.99 $69.65
5,000 $350 $7,768 $7,313 $38.84 $59.79
10,000 $467 $9,710 $10,186 $97.10 $106.52
F Factory Industrial 1,000 $233 $5,826 $6,007 $20.81 $45.01 5,000 $467 $6,658 $7,574 $33.29 $47.01
10,000 $467 $8,323 $9,924 $36.07 $25.84
20,000 $700 $11,930 $12,275 $5.55 $6.09
50,000 $700 $13,594 $14,103 $3.33 $11.44
100,000 $934 $15,259 $19,588 $15.26 $20.52
F F Occupancy Tenant Improvements 1,000 $233 $4,716 $4,701 $27.74 $45.01 5,000 $467 $5,826 $6,268 $33.29 $41.79
10,000 $467 $7,491 $8,357 $27.74 $2.33
20,000 $700 $10,265 $8,357 $5.55 $11.32
50,000 $700 $11,930 $11,753 $5.55 $9.87
100,000 $934 $14,704 $16,454 $14.70 $17.39
H High Hazard 100 $117 $5,826 $4,179 $346.79 $355.64 500 $233 $7,213 $5,485 $443.89 $313.40
1,000 $233 $9,433 $7,052 $332.92 $11.67
2,000 $350 $12,762 $7,052 $73.98 $95.76
5,000 $350 $14,981 $9,924 $72.13 $80.69
10,000 $467 $18,588 $13,842 $185.88 $143.09
H H Occupancy Tenant Improvements 100 $117 $3,329 $3,134 $208.08 $290.35 500 $233 $4,162 $4,179 $277.43 $313.40
1,000 $233 $5,549 $5,746 $194.20 $11.67
2,000 $350 $7,491 $5,746 $46.24 $78.35
5,000 $350 $8,878 $8,096 $38.84 $65.02
10,000 $467 $10,820 $11,230 $108.20 $116.97
I Institutional 500 $233 $6,658 $4,440 $83.23 $90.02 2,500 $467 $8,323 $6,007 $99.88 $73.13
5,000 $467 $10,820 $7,835 $77.68 $4.67
10,000 $700 $14,704 $7,835 $16.65 $22.63
25,000 $700 $17,201 $11,230 $16.65 $17.65
50,000 $934 $21,362 $15,409 $42.72 $32.69
I I Occupancy Tenant Improvements 100 $117 $4,162 $3,134 $277.43 $290.35 500 $233 $5,271 $4,179 $277.43 $261.17
1,000 $233 $6,658 $5,485 $249.69 $11.67
Base Cost1 Cost for each Add. 100 Sq. Ft.1,2
City of Cupertino, CA
Resolution 24-XXX
Fee Effective July 14, 2024
Schedule D - Table 1 Plan Check and Inspection Fees
2,000 $350 $9,155 $5,485 $46.24 $78.35
5,000 $350 $10,542 $7,835 $49.94 $59.79
10,000 $467 $13,039 $10,708 $130.39 $111.75
M Mercantile 2,000 $350 $7,768 $6,529 $27.74 $27.23 10,000 $700 $9,988 $8,357 $27.74 $28.73
20,000 $700 $12,762 $11,230 $22.19 $1.75
40,000 $1,050 $17,201 $11,230 $5.09 $7.84
100,000 $1,050 $20,253 $15,931 $4.99 $6.62
200,000 $1,400 $25,246 $22,200 $12.62 $11.80
M M Occupancy Tenant Improvements 300 $233 $3,329 $3,656 $69.36 $128.27 1,500 $467 $4,162 $4,962 $92.48 $104.47
3,000 $467 $5,549 $6,529 $64.73 $7.78
6,000 $700 $7,491 $6,529 $15.41 $31.92
15,000 $700 $8,878 $9,402 $12.95 $24.19
30,000 $934 $10,820 $12,797 $36.07 $45.77
R-1 Residential—Hotels & Motels 3,000 $350 $9,155 $7,574 $20.81 $22.51 15,000 $700 $11,652 $9,924 $22.19 $20.89
30,000 $700 $14,981 $13,059 $17.57 $1.17
60,000 $1,050 $20,253 $13,059 $3.70 $6.09
150,000 $1,050 $23,582 $18,543 $3.88 $5.11
300,000 $1,400 $29,408 $25,856 $9.80 $9.09
R-2 Residential—Apartment Building 800 $233 $7,213 $6,007 $60.69 $64.43 4,000 $467 $9,155 $7,835 $69.36 $58.76
8,000 $467 $11,930 $10,186 $52.02 $2.92
16,000 $700 $16,091 $10,186 $11.56 $17.41
40,000 $700 $18,865 $14,364 $11.79 $14.95
80,000 $934 $23,582 $20,110 $29.48 $26.30
R-2 Residential—Apartment Building 800 $233 $277 $6,007 $0.00 $64.43 - Repeat Unit 4,000 $467 $277 $7,835 $0.00 $58.76 8,000 $467 $277 $10,186 $0.00 $2.92
16,000 $700 $277 $10,186 $1.16 $17.41
40,000 $700 $555 $14,364 $0.00 $14.95
80,000 $934 $555 $20,110 $0.69 $26.30
R-3 Dwellings—Custom Homes, Models, 1,000 $233 $5,271 $6,268 $18.50 $52.23 First Master Plan 2,500 $233 $5,549 $7,052 $73.98 $52.23 4,000 $233 $6,658 $7,835 $13.87 $76.96
6,000 $467 $6,936 $9,141 $55.49 $26.12
8,000 $467 $8,046 $9,663 $13.87 $76.96
10,000 $700 $8,323 $10,969 $83.23 $116.69
R-3 Dwellings—Production Phase 1,000 $117 $555 $4,440 $0.00 $112.25 of Master Plan (Repeats) 2,500 $233 $555 $6,007 $18.50 $121.88 4,000 $233 $832 $7,835 $13.87 $11.67
6,000 $467 $1,110 $7,835 $13.87 $169.76
8,000 $467 $1,387 $11,230 $13.87 $220.61
10,000 $700 $1,665 $15,409 $16.65 $161.09
R-3 Group Care 1,000 $233 $6,104 $6,007 $41.62 $58.07 5,000 $467 $7,768 $8,096 $44.39 $47.01
10,000 $467 $9,988 $10,447 $36.07 $2.33
20,000 $700 $13,594 $10,447 $7.40 $14.80
50,000 $700 $15,814 $14,887 $7.77 $11.96
100,000 $934 $19,698 $20,632 $19.70 $21.57
R R Occupancy Tenant Improvements 80 $233 $2,497 $3,395 $173.40 $326.46 400 $233 $3,052 $4,440 $208.08 $326.46
800 $233 $3,884 $5,746 $173.40 $29.18
1,600 $467 $5,271 $5,746 $34.68 $108.82
4,000 $467 $6,104 $8,357 $41.62 $77.66
8,000 $700 $7,768 $11,230 $97.10 $149.13
S Storage 600 $233 $4,716 $4,179 $57.80 $64.14 3,000 $467 $6,104 $5,485 $55.49 $60.94
6,000 $467 $7,768 $7,313 $46.24 $3.89
12,000 $700 $10,542 $7,313 $9.25 $17.41
30,000 $700 $12,207 $10,447 $10.17 $13.84
60,000 $934 $15,259 $14,364 $25.43 $25.50
S S Occupancy Tenant Improvements 600 $233 $3,884 $3,918 $46.24 $64.14 3,000 $467 $4,994 $5,223 $46.24 $60.94
6,000 $467 $6,381 $7,052 $36.99 $3.89
12,000 $700 $8,600 $7,052 $7.71 $15.96
30,000 $700 $9,988 $9,924 $8.32 $13.84
60,000 $934 $12,485 $13,842 $20.81 $24.63
U Accessory 40
200
400
City of Cupertino, CA
Resolution 24-XXX
Fee Effective July 14, 2024
Schedule D - Table 1 Plan Check and Inspection Fees
800
1,000 $233 $2,219 $3,656 $27.74 $168.37
2,000 $350 $2,497 $5,223 $41.62 $110.30
4,000 $467 $3,329 $7,313 $83.23 $194.49
Standard Comm. Foundation 500 $233 $2,774 $3,918 $27.74 $76.96 w/o Podium 2,500 $467 $3,329 $5,223 $44.39 $62.68 5,000 $467 $4,439 $6,790 $33.29 $4.67
10,000 $700 $6,104 $6,790 $5.55 $19.15
25,000 $700 $6,936 $9,663 $6.66 $15.56
50,000 $934 $8,600 $13,320 $17.20 $28.51
Standard Comm. Foundation 500 $233 $3,052 $4,179 $41.62 $76.96 with Podium 2,500 $467 $3,884 $5,485 $44.39 $73.13 5,000 $467 $4,994 $7,313 $33.29 $4.67
10,000 $700 $6,658 $7,313 $7.40 $20.89
25,000 $700 $7,768 $10,447 $7.77 $16.60
50,000 $934 $9,710 $14,364 $19.42 $30.60
All Shell Buildings 500 $233 $3,329 $3,656 $41.62 $76.96 2,500 $467 $4,162 $4,962 $55.49 $62.68
5,000 $467 $5,549 $6,529 $38.84 $4.67
10,000 $700 $7,491 $6,529 $9.25 $19.15
25,000 $700 $8,878 $9,402 $7.77 $14.51
50,000 $934 $10,820 $12,797 $21.64 $27.46
1 At Building Permit submittal, a Planning Division Review fee of 20% shall be collected (see Table 3 - Misc. Items) 2 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.

FEE DESCRIPTION Unit FY 2024-25
Proposed Fee

MECHANICAL FEES
Mechanical Permit Fee Each $266
Stand Alone Mechanical Plan Check (hourly rate) Each $266 Other Mechanical Inspections (hourly rate) Each $266
MECHANICAL UNIT FEES:

Install or relocate HVAC system or portion there of
Residential Each $261
Commercial Each $392
Hood installation that is served by mechanical exhaust, including the ducts for such hood
Residential Each $131
Commercial Each $522
Any other piece of equipment or appliance not listed in Mechanical schedule. Each $261 Electrical Permit Fee Each $266
Electrical Plan Check Each $266
Electrical Inspections Each $266
ELECTRICAL UNIT FEES:

Residential Whole-House Rewire (up to 2500 sq ft) Each $522 Each Additional 1000 sq ft Each 1,000 sf $261
Receptacle, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters
First 20 First 20 $87
Each Additional Each $9

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees

ELECTRICAL FEES
FEE DESCRIPTION Unit FY 2024-25
Proposed Fee

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees Lighting fixtures, sockets, or other lamp-holding devices First 20 First 20 $131
Each Additional Each $9
Pole or platform-mounted lighting fixtures Each $30
Appliances (Install / Repair / Replace)
Residential Each $44
Commercial Each $86
Power Apparatus - Generator/Transformer or Similar (Install/Repair/Replace) Residential Each $261
Commercial Each $392
Services (including Temporary Power)
600 volts or less, up to 200 amperes in rating Each $87 600 volts or less, 201 to 1000 amperes in rating Each $261 Over 600 volts or over 1000 amperes in rating Each $392 Any other Electrical apparatus, conduits, and conductors not listed in Electrical Schedule. Each $261

PLUMBING/GAS FEES
Plumbing/Gas Permit Fee Each $266
Stand Alone Plumbing Plan Check Each $266
Other Plumbing and Gas Inspections Each $266
PLUMBING/GAS UNIT FEES:

Residential Whole-House Re-Plumbing (up to 2500 sq ft) Each $522 Each Additional 1000 sq ft Each 1,000 sf $261
Building sewer lateral (Install / Repair / Replace)
Residential Each $65
Commercial Each $131
Sewer Clean-out (Install/Repair/Replace)
Residential Each $65
Commercial Each $131
Building Drain/Waste/Vent Repair
Residential Each $18
Commercial Each $26
Water Heater Replacement / Installation - All Types
FEE DESCRIPTION Unit FY 2024-25
Proposed Fee

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees Residential Each $65
Commercial Each $196
Interceptors - Grease/Sand (Install/Repair/Replace) Each $196 Water Treatment System (Install/Repair/Replace) Each $87 Gas piping (Install/Repair/Replace) Each 4 $131
Install or Replace Water Meter / Service Each $65
Partial Water Re-pipe
Residential Per fixture $26
Commercial Per fixture $17
Any other device/fixture not listed in Plumbing Schedule (Install/Repair/Replace) Each $131 Work Item Unit FY 2024-25 Proposed Fee
Standard Hourly Rate - Building Per hour $266
Accessibility Hardship Exemption Each $277
Acoustical Review
Single Family Home/Duplex—New Each $655
Single Family Home/Duplex—Addition/Alteration Each $386 Multi-Family/Commercial Each $655
Additions (Non Hillside R3 Occupancy) - Plan Check Fees Plan Check Fees (up to 250 sq. ft.) Each $1,159
Plan Check Fees (251 - 499 sq. ft.) Each $2,236
Plan Check Fees (500-999 sq. ft.) Each $2,767
Additions (Non Hillside R3 Occupancy) - Inspection Fees Inspection Fees (up to 250 sq. ft.) Each $1,874
Inspection Fees (251 - 499 sq. ft.) Each $2,392
Inspection Fees (500-999 sq. ft.) Each $2,990
Accessory Buildings - Residential
Accessory Buildings (Up to 499 sq. ft.) Each $1,716
Accessory Buildings (500 - 999 sq. ft.) Each $2,516
Accessory Dwelling Unit (ADU) - Plan Check Fees
Plan Check Fees (up to 499 sq. ft.) Each $2,453
Plan Check Fees (500 - 999 sq. ft.) Each $3,563
Accessory Dwelling Unit (ADU) - Inspection Fees
Inspection Fees (up to 499 sq. ft.) Each $2,612
Inspection Fees (500 - 999 sq. ft.) Each $3,656
Address Assignment Per hour $233
Board of Appeals Per hour $266
Clerical Fee 1/2 hour $117
Alternate Materials and Methods of Construction Per hour $255 Antenna—Telecom Facility
Radio Each $458
Cellular/Mobile Phone, alterations to existing facility Each $655 Cellular/Mobile Phone, free-standing Each $2,271
Cellular/Mobile Phone, attached to building Each $1,194 Arbor/Trellis Each $655
Awning/Canopy (supported by building) Each $655
Balcony Addition Each $1,588
Battery Energy Storage System up to three (3) $655
Each Additional Each $386
Below Market Rate
Escrow Inspection % of Sale Price 0.52%

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Work Item Unit FY 2024-25 Proposed Fee

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Carport Each $916
Certifications
Special Inspector Qualifications (initial review) Each $511 Special Inspector Qualifications (renewal / update) Each $233 Chimney (new) Each $916
Chimney Repair Each $517
Commercial Coach (per unit) Each $1,194
Covered Porch Each $916
Deck (wood) Each $916
Deck Railing Each $517
Deferred Submittal (2 hour minimum) Each $266
Demolition
Multi-Family and Commercial (up to 3,000 sf) Base $772
Multi-Family and Commercial (each additional 3,000 sf) Each 3,000 sf $269 Residential (R-3 Occ) (up to 3,000 sf) Base $772
Residential (R-3 Occ) (each additional 3,000 sf) Each 3,000 sf $269 Swimming Pool Residential Each $517
Swimming Pool Multi-Family and Commercial (up to 3,000 sf) Base $778 Swimming Pool Multi-Family and Commercial (each additional 3,000 sf) Each 3,000 sf $261 Disabled Access Compliance Inspection Per hour $266
Door
New door (non structural) Each $386
New door (structural shear wall/masonry) Each $655
Duplicate / Replacement Job Card Each $117
Electric Vehicle Charging Station Each $266
Extensions
Plan Check Applications (within 180 days of Submittal) 1 hour $266 Permits (within 180 days of Issuance)
Start construction, without plans 1/2 hour $139
Resume or complete construction, without plans 1/2 hour $139 Start construction, with plans 1 hour $277
Resume or complete construction, with plans 2 hours $555 Fence
Non-masonry, over 7 feet in height Up to 100 l.f. $517
Non-masonry, each additional 100 l.f. Each 100 l.f. $131 Masonry, over 7 feet in height Up to 100 l.f. $916
Masonry, each additional 100 l.f. Each 100 l.f. $522
Fireplace
Masonry each $916
Pre-Fabricated/Metal each $517
Work Item Unit FY 2024-25 Proposed Fee

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Flag pole (over 20 feet in height) each $517
Foundation Repair each $1,178
Inspections
Pre-Inspection Fee Per hour $266
Standard Inspection Hourly Rate Per hour $266
Progress Inspection Per hour $266
Partial Inspection Per hour $266
Courtesy Inspection - 2 hour minimum Per hour $266
Cancelled inspection w/out advance notice Per hour $266 Reinspection Per hour $266
Outside of normal business hours (2 hour minimum) Per hour $308 Inspection Supplemental Fee (Projects that require more inspections than average, the Building Official may charge additional inspection fees) First 1/2 hour minimum First 1/2 hour $131
Each Additional hour Per hour $261
Lighting pole Each $655
each additional pole Each $269
Modular Structures Each $933
Modification of Technical Code 1 hour $266
Occupancy
Certificate of Occupancy/Completion Each $517
Temporary Occupancy Permit Per six months $517
Partition—Commercial, Interior (up to 30 l.f.) Up to 30 l.f. $786 Additional partition Each 30 l.f. $261
Partition—Residential, Interior (up to 30 l.f.) Up to 30 l.f. $517 Additional partition Each 30 l.f. $261
Patio Cover / Gazebo
Wood frame Up to 300 sf $933
Metal frame Up to 300 sf $933
Other frame Up to 300 sf $933
Additional patio Each 300 sf $400
Enclosed prefabricated Sun Room Up to 300 sf $916
Photovoltaic System
Residential
Systems up to 15kW Each $450
Each Additional kW Above 15kW Each Addl kW $15
Multi-Family and Commercial:

Systems up to 50kW up to 8 kW Each $1,000
Multi-Family Res/Commercial, each additional 1 kilowatt Each 1 addl kW $7 Each Additional kW Above 250kW Each addl kW $5
Work Item Unit FY 2024-25 Proposed Fee

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Thermal System
Residential:

Systems up to 10kW Each $450
Each Additional kW Above 10kW Each addl kW $15
Multi-Family and Commercial:

Systems up to 30kW Each $1,000
Each Additional kW between 30kW and 260kW Each addl kW $7 Each Additional kW Above 260kW Each addl kW $5
Pile Foundation
Cast in Place Concrete (first 10 piles) Up to 10 $1,194 Additional Piles (increments of 10) Each 10 $800
Driven (steel, pre-stressed concrete) Up to 10 $1,194
Additional Piles (increments of 10) Each 10 $800
Product Review Per hour $255
Plan Review
Standard Plan Review Hourly Rate Per hour $277
Overtime Plan Review (2 hour minimum) Per hour $325
Pre-Submittal Plan Review (2 hour minimum) Per hour $277 Expedited Plan Review Each 1.5x Plan Check Fee
Plan Review Supplemental Fee (after 2nd review)
First 1/2 hour minimum First 1/2 hour $278
Pre-Construction Meeting each $450
Remodel—Residential
Kitchen (up to 300 sq. ft.) Each $1,039
Bath (up to 300 sq. ft.) Each $1,039
Other Remodel (up to 300 sq. ft.) Each $916
Additional remodel (per sq. ft. above 300) Per s.f. $2.29 Other Remodel (1000 sq. ft.) Each $2,516
Additional remodel (per sq. ft. above 1000) Per s.f. $0.53 Other Remodel (2500+ sq. ft.) Each $3,316
Additional remodel (per sq. ft. above 2500) Per s.f. $0.27 Re-roof
Residential (maximum $500 per building) Each 100 sf $25 Multi-Family Dwelling (maximum $500 per building) Each 100 sf $25 Commercial
Commercial (first 5,000 sf) Each $639
Commercial (each additional 2,500 sf) Each 2,500 sf $261 Retaining Wall (concrete or masonry)
Standard (up to 50 l.f.) Up to 50 l.f. $1,194
Additional retaining wall Each 50 l.f. $800
Work Item Unit FY 2024-25 Proposed Fee

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Special Design, 3-10' high (up to 50 l.f.) Up to 50 l.f. $1,733 Additional retaining wall Each 50 l.f. $1,061
Special Design, over 10' high (up to 50 l.f.) Up to 50 l.f. $1,994 Additional retaining wall Each 50 l.f. $1,322
Gravity/Crib Wall, 0-10' high (up to 50 l.f.) Up to 50 l.f. $1,733 Additional Gravity/Crib Wall Each 50 l.f. $1,061
Gravity/Crib Wall, over 10' high (up to 50 l.f.) Up to 50 l.f. $1,994 Additional Gravity/Crib Wall Each 50 l.f. $1,322
Revisions $266
Sauna—steam Each $916
Siding
Stone and Brick Veneer (interior or exterior) Up to 400 sf $639 All Other Up to 400 sf $508
Additional siding Each 400 sf $131
Signs
Directional Each $517
Each additional Directional Sign Each $269
Ground/Roof/Projecting Signs Each $517
Master Plan Sign Check Each $517
Rework of any existing Ground Sign Each $517
Other Sign Each $517
Reinspection Fee Each $124
Wall/Awning Sign, Non-Electric Each $386
Wall/Awning Sign, Electric Each $517
Skylight
50 sf or less (cumulative area) Each $517
Greater than 50 sf or structural Each $269
Stairs—First Flight First flight $517
Each additional flight Per flight $269
Storage Racks
0-8' high (up to 100 l.f.) First 100 l.f. $655
each additional 100 l.f. Each 100 l.f. $131
over 8' high (up to 100 l.f.) First 100 l.f. $786
each additional 100 l.f. Each 100 l.f. $131
Stucco Applications
Base Up to 400 sf $508
Additional Stucco Application Each 400 sf $131
Swimming Pool/Spa
Vinyl-lined Each $1,194
Fiberglass Each $1,194
Work Item Unit FY 2024-25 Proposed Fee

CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Gunite (up to 800 sf) Each $1,716
Additional pool (over 800 sf) Each 100 sf $400
Commercial pool (up to 800 sf) Each $2,910
Additional pool (over 800 sf) Each 100 sf $800
Spa or Hot Tub (Pre-fabricated) Each $517
Technology Fee Per Permit 5.8%
Temporary Structures Each $786
Tenant Improvement Preparation Each $517
Window or Sliding Glass Door
Replacement (first 8 windows) First 8 $378
Replacement (each additional 8 windows) Each 8 $131
New Window (non structural) Each $324
New window (structural shear wall/masonry) Each $458
Bay Window (structural) Each $458
Planning Department Review fee (New Construction and Additions) (Payable at permit submittal) Each 20% of plan review and
inspection fees
Planning Hourly Rate (Misc Reviews) Per hour Refer to Schedule C Housing Mitigation In-lieu fees (Payable at Building Permit issuance) Per sq. ft. Refer to Schedule C Zoning, Planning, Municipal Code fees (Payable at Building Permit issuance) Per sq. ft. Refer to Schedule C Wireless Master Plan fee (Payable at Building Permit issuance) Each Refer to Schedule C Refunds - Plan Check Fees
1st review not started (within 3 Business of Submittal) 100% of Plan Review Fees Plan review more than 3 Business Days after the Date of Submittal No refund Refunds - Building Permit Fees
No inspections and permit is active (not expired) 80% of permit fees No inspections and permit is expired No refund
Inspections were provided No refund
Work without permit - based on current permit and plan check fees Double fees NOTE:

Fee Adjustments: In instances where the strict application of fees from this schedule would constitute a substantial inequity to an applicant or to the City, the Chief Building Official shall be authorized to adjust such fees on a case-by-case basis. Any such adjustments shall be recorded in writing and entered into the appropriate files.

Fees identified in this Table consist of 50% Plan Review Fee and 50% Inspection Fee

← All documents from this meeting