City of Cupertino, CA
Resolution 24-XXX
Fee Effective July 14, 2024
Schedule D - Table 1 Plan Check and Inspection Fees
Related IBC
Class
Building Use
(e.g., IBC Occupancy Type) Sq. Ft. Permit Tech
Cost
Plan Check
Cost
Inspection
Cost
Plan Check
Cost Inspection Cost
A Assembly 250 $117 $4,162 $3,918 $110.97 $116.14 1,250 $233 $5,271 $4,962 $110.97 $125.36
2,500 $233 $6,658 $6,529 $88.78 $4.67
5,000 $350 $8,878 $6,529 $22.19 $34.82
12,500 $350 $10,542 $9,141 $19.98 $30.18
25,000 $467 $13,039 $12,797 $52.16 $53.06
A A Occupancy Tenant Improvements 500 $233 $3,329 $3,918 $41.62 $76.96 2,500 $467 $4,162 $5,223 $44.39 $73.13
5,000 $467 $5,271 $7,052 $38.84 $4.67
10,000 $700 $7,213 $7,052 $7.40 $19.15
25,000 $700 $8,323 $9,924 $7.77 $16.60
50,000 $934 $10,265 $13,842 $20.53 $29.55
B Business 1,000 $233 $5,271 $5,746 $34.68 $51.54 5,000 $467 $6,658 $7,574 $38.84 $47.01
10,000 $467 $8,600 $9,924 $30.52 $25.84
20,000 $700 $11,652 $12,275 $6.47 $6.09
50,000 $700 $13,594 $14,103 $6.66 $11.44
100,000 $934 $16,923 $19,588 $16.92 $20.52
B B Occupancy Tenant Improvements 300 $117 $4,162 $3,134 $92.48 $118.55 1,500 $233 $5,271 $4,440 $92.48 $69.65
3,000 $233 $6,658 $5,485 $83.23 $3.89
6,000 $350 $9,155 $5,485 $15.41 $26.12
15,000 $350 $10,542 $7,835 $16.65 $19.93
30,000 $467 $13,039 $10,708 $43.46 $37.25
E Educational 100 $117 $4,162 $3,134 $277.43 $290.35 500 $233 $5,271 $4,179 $277.43 $313.40
1,000 $233 $6,658 $5,746 $249.69 $11.67
2,000 $350 $9,155 $5,746 $46.24 $78.35
5,000 $350 $10,542 $8,096 $49.94 $65.02
10,000 $467 $13,039 $11,230 $130.39 $116.97
E E Occupancy Tenant Improvements 100 $117 $3,052 $3,134 $208.08 $225.05 500 $233 $3,884 $3,918 $221.95 $261.17
1,000 $233 $4,994 $5,223 $166.46 $11.67
2,000 $350 $6,658 $5,223 $36.99 $69.65
5,000 $350 $7,768 $7,313 $38.84 $59.79
10,000 $467 $9,710 $10,186 $97.10 $106.52
F Factory Industrial 1,000 $233 $5,826 $6,007 $20.81 $45.01 5,000 $467 $6,658 $7,574 $33.29 $47.01
10,000 $467 $8,323 $9,924 $36.07 $25.84
20,000 $700 $11,930 $12,275 $5.55 $6.09
50,000 $700 $13,594 $14,103 $3.33 $11.44
100,000 $934 $15,259 $19,588 $15.26 $20.52
F F Occupancy Tenant Improvements 1,000 $233 $4,716 $4,701 $27.74 $45.01 5,000 $467 $5,826 $6,268 $33.29 $41.79
10,000 $467 $7,491 $8,357 $27.74 $2.33
20,000 $700 $10,265 $8,357 $5.55 $11.32
50,000 $700 $11,930 $11,753 $5.55 $9.87
100,000 $934 $14,704 $16,454 $14.70 $17.39
H High Hazard 100 $117 $5,826 $4,179 $346.79 $355.64 500 $233 $7,213 $5,485 $443.89 $313.40
1,000 $233 $9,433 $7,052 $332.92 $11.67
2,000 $350 $12,762 $7,052 $73.98 $95.76
5,000 $350 $14,981 $9,924 $72.13 $80.69
10,000 $467 $18,588 $13,842 $185.88 $143.09
H H Occupancy Tenant Improvements 100 $117 $3,329 $3,134 $208.08 $290.35 500 $233 $4,162 $4,179 $277.43 $313.40
1,000 $233 $5,549 $5,746 $194.20 $11.67
2,000 $350 $7,491 $5,746 $46.24 $78.35
5,000 $350 $8,878 $8,096 $38.84 $65.02
10,000 $467 $10,820 $11,230 $108.20 $116.97
I Institutional 500 $233 $6,658 $4,440 $83.23 $90.02 2,500 $467 $8,323 $6,007 $99.88 $73.13
5,000 $467 $10,820 $7,835 $77.68 $4.67
10,000 $700 $14,704 $7,835 $16.65 $22.63
25,000 $700 $17,201 $11,230 $16.65 $17.65
50,000 $934 $21,362 $15,409 $42.72 $32.69
I I Occupancy Tenant Improvements 100 $117 $4,162 $3,134 $277.43 $290.35 500 $233 $5,271 $4,179 $277.43 $261.17
1,000 $233 $6,658 $5,485 $249.69 $11.67
Base Cost1 Cost for each Add. 100 Sq. Ft.1,2
City of Cupertino, CA
Resolution 24-XXX
Fee Effective July 14, 2024
Schedule D - Table 1 Plan Check and Inspection Fees
2,000 $350 $9,155 $5,485 $46.24 $78.35
5,000 $350 $10,542 $7,835 $49.94 $59.79
10,000 $467 $13,039 $10,708 $130.39 $111.75
M Mercantile 2,000 $350 $7,768 $6,529 $27.74 $27.23 10,000 $700 $9,988 $8,357 $27.74 $28.73
20,000 $700 $12,762 $11,230 $22.19 $1.75
40,000 $1,050 $17,201 $11,230 $5.09 $7.84
100,000 $1,050 $20,253 $15,931 $4.99 $6.62
200,000 $1,400 $25,246 $22,200 $12.62 $11.80
M M Occupancy Tenant Improvements 300 $233 $3,329 $3,656 $69.36 $128.27 1,500 $467 $4,162 $4,962 $92.48 $104.47
3,000 $467 $5,549 $6,529 $64.73 $7.78
6,000 $700 $7,491 $6,529 $15.41 $31.92
15,000 $700 $8,878 $9,402 $12.95 $24.19
30,000 $934 $10,820 $12,797 $36.07 $45.77
R-1 Residential—Hotels & Motels 3,000 $350 $9,155 $7,574 $20.81 $22.51 15,000 $700 $11,652 $9,924 $22.19 $20.89
30,000 $700 $14,981 $13,059 $17.57 $1.17
60,000 $1,050 $20,253 $13,059 $3.70 $6.09
150,000 $1,050 $23,582 $18,543 $3.88 $5.11
300,000 $1,400 $29,408 $25,856 $9.80 $9.09
R-2 Residential—Apartment Building 800 $233 $7,213 $6,007 $60.69 $64.43 4,000 $467 $9,155 $7,835 $69.36 $58.76
8,000 $467 $11,930 $10,186 $52.02 $2.92
16,000 $700 $16,091 $10,186 $11.56 $17.41
40,000 $700 $18,865 $14,364 $11.79 $14.95
80,000 $934 $23,582 $20,110 $29.48 $26.30
R-2 Residential—Apartment Building 800 $233 $277 $6,007 $0.00 $64.43 - Repeat Unit 4,000 $467 $277 $7,835 $0.00 $58.76 8,000 $467 $277 $10,186 $0.00 $2.92
16,000 $700 $277 $10,186 $1.16 $17.41
40,000 $700 $555 $14,364 $0.00 $14.95
80,000 $934 $555 $20,110 $0.69 $26.30
R-3 Dwellings—Custom Homes, Models, 1,000 $233 $5,271 $6,268 $18.50 $52.23 First Master Plan 2,500 $233 $5,549 $7,052 $73.98 $52.23 4,000 $233 $6,658 $7,835 $13.87 $76.96
6,000 $467 $6,936 $9,141 $55.49 $26.12
8,000 $467 $8,046 $9,663 $13.87 $76.96
10,000 $700 $8,323 $10,969 $83.23 $116.69
R-3 Dwellings—Production Phase 1,000 $117 $555 $4,440 $0.00 $112.25 of Master Plan (Repeats) 2,500 $233 $555 $6,007 $18.50 $121.88 4,000 $233 $832 $7,835 $13.87 $11.67
6,000 $467 $1,110 $7,835 $13.87 $169.76
8,000 $467 $1,387 $11,230 $13.87 $220.61
10,000 $700 $1,665 $15,409 $16.65 $161.09
R-3 Group Care 1,000 $233 $6,104 $6,007 $41.62 $58.07 5,000 $467 $7,768 $8,096 $44.39 $47.01
10,000 $467 $9,988 $10,447 $36.07 $2.33
20,000 $700 $13,594 $10,447 $7.40 $14.80
50,000 $700 $15,814 $14,887 $7.77 $11.96
100,000 $934 $19,698 $20,632 $19.70 $21.57
R R Occupancy Tenant Improvements 80 $233 $2,497 $3,395 $173.40 $326.46 400 $233 $3,052 $4,440 $208.08 $326.46
800 $233 $3,884 $5,746 $173.40 $29.18
1,600 $467 $5,271 $5,746 $34.68 $108.82
4,000 $467 $6,104 $8,357 $41.62 $77.66
8,000 $700 $7,768 $11,230 $97.10 $149.13
S Storage 600 $233 $4,716 $4,179 $57.80 $64.14 3,000 $467 $6,104 $5,485 $55.49 $60.94
6,000 $467 $7,768 $7,313 $46.24 $3.89
12,000 $700 $10,542 $7,313 $9.25 $17.41
30,000 $700 $12,207 $10,447 $10.17 $13.84
60,000 $934 $15,259 $14,364 $25.43 $25.50
S S Occupancy Tenant Improvements 600 $233 $3,884 $3,918 $46.24 $64.14 3,000 $467 $4,994 $5,223 $46.24 $60.94
6,000 $467 $6,381 $7,052 $36.99 $3.89
12,000 $700 $8,600 $7,052 $7.71 $15.96
30,000 $700 $9,988 $9,924 $8.32 $13.84
60,000 $934 $12,485 $13,842 $20.81 $24.63
U Accessory 40
200
400
City of Cupertino, CA
Resolution 24-XXX
Fee Effective July 14, 2024
Schedule D - Table 1 Plan Check and Inspection Fees
800
1,000 $233 $2,219 $3,656 $27.74 $168.37
2,000 $350 $2,497 $5,223 $41.62 $110.30
4,000 $467 $3,329 $7,313 $83.23 $194.49
Standard Comm. Foundation 500 $233 $2,774 $3,918 $27.74 $76.96 w/o Podium 2,500 $467 $3,329 $5,223 $44.39 $62.68 5,000 $467 $4,439 $6,790 $33.29 $4.67
10,000 $700 $6,104 $6,790 $5.55 $19.15
25,000 $700 $6,936 $9,663 $6.66 $15.56
50,000 $934 $8,600 $13,320 $17.20 $28.51
Standard Comm. Foundation 500 $233 $3,052 $4,179 $41.62 $76.96 with Podium 2,500 $467 $3,884 $5,485 $44.39 $73.13 5,000 $467 $4,994 $7,313 $33.29 $4.67
10,000 $700 $6,658 $7,313 $7.40 $20.89
25,000 $700 $7,768 $10,447 $7.77 $16.60
50,000 $934 $9,710 $14,364 $19.42 $30.60
All Shell Buildings 500 $233 $3,329 $3,656 $41.62 $76.96 2,500 $467 $4,162 $4,962 $55.49 $62.68
5,000 $467 $5,549 $6,529 $38.84 $4.67
10,000 $700 $7,491 $6,529 $9.25 $19.15
25,000 $700 $8,878 $9,402 $7.77 $14.51
50,000 $934 $10,820 $12,797 $21.64 $27.46
1 At Building Permit submittal, a Planning Division Review fee of 20% shall be collected (see Table 3 - Misc. Items) 2 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
FEE DESCRIPTION Unit FY 2024-25
Proposed Fee
MECHANICAL FEES
Mechanical Permit Fee Each $266
Stand Alone Mechanical Plan Check (hourly rate) Each $266 Other Mechanical Inspections (hourly rate) Each $266
MECHANICAL UNIT FEES:
Install or relocate HVAC system or portion there of
Residential Each $261
Commercial Each $392
Hood installation that is served by mechanical exhaust, including the ducts for such hood
Residential Each $131
Commercial Each $522
Any other piece of equipment or appliance not listed in Mechanical schedule. Each $261 Electrical Permit Fee Each $266
Electrical Plan Check Each $266
Electrical Inspections Each $266
ELECTRICAL UNIT FEES:
Residential Whole-House Rewire (up to 2500 sq ft) Each $522 Each Additional 1000 sq ft Each 1,000 sf $261
Receptacle, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters
First 20 First 20 $87
Each Additional Each $9
CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees
ELECTRICAL FEES
FEE DESCRIPTION Unit FY 2024-25
Proposed Fee
CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees Lighting fixtures, sockets, or other lamp-holding devices First 20 First 20 $131
Each Additional Each $9
Pole or platform-mounted lighting fixtures Each $30
Appliances (Install / Repair / Replace)
Residential Each $44
Commercial Each $86
Power Apparatus - Generator/Transformer or Similar (Install/Repair/Replace) Residential Each $261
Commercial Each $392
Services (including Temporary Power)
600 volts or less, up to 200 amperes in rating Each $87 600 volts or less, 201 to 1000 amperes in rating Each $261 Over 600 volts or over 1000 amperes in rating Each $392 Any other Electrical apparatus, conduits, and conductors not listed in Electrical Schedule. Each $261
PLUMBING/GAS FEES
Plumbing/Gas Permit Fee Each $266
Stand Alone Plumbing Plan Check Each $266
Other Plumbing and Gas Inspections Each $266
PLUMBING/GAS UNIT FEES:
Residential Whole-House Re-Plumbing (up to 2500 sq ft) Each $522 Each Additional 1000 sq ft Each 1,000 sf $261
Building sewer lateral (Install / Repair / Replace)
Residential Each $65
Commercial Each $131
Sewer Clean-out (Install/Repair/Replace)
Residential Each $65
Commercial Each $131
Building Drain/Waste/Vent Repair
Residential Each $18
Commercial Each $26
Water Heater Replacement / Installation - All Types
FEE DESCRIPTION Unit FY 2024-25
Proposed Fee
CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees Residential Each $65
Commercial Each $196
Interceptors - Grease/Sand (Install/Repair/Replace) Each $196 Water Treatment System (Install/Repair/Replace) Each $87 Gas piping (Install/Repair/Replace) Each 4 $131
Install or Replace Water Meter / Service Each $65
Partial Water Re-pipe
Residential Per fixture $26
Commercial Per fixture $17
Any other device/fixture not listed in Plumbing Schedule (Install/Repair/Replace) Each $131 Work Item Unit FY 2024-25 Proposed Fee
Standard Hourly Rate - Building Per hour $266
Accessibility Hardship Exemption Each $277
Acoustical Review
Single Family Home/Duplex—New Each $655
Single Family Home/Duplex—Addition/Alteration Each $386 Multi-Family/Commercial Each $655
Additions (Non Hillside R3 Occupancy) - Plan Check Fees Plan Check Fees (up to 250 sq. ft.) Each $1,159
Plan Check Fees (251 - 499 sq. ft.) Each $2,236
Plan Check Fees (500-999 sq. ft.) Each $2,767
Additions (Non Hillside R3 Occupancy) - Inspection Fees Inspection Fees (up to 250 sq. ft.) Each $1,874
Inspection Fees (251 - 499 sq. ft.) Each $2,392
Inspection Fees (500-999 sq. ft.) Each $2,990
Accessory Buildings - Residential
Accessory Buildings (Up to 499 sq. ft.) Each $1,716
Accessory Buildings (500 - 999 sq. ft.) Each $2,516
Accessory Dwelling Unit (ADU) - Plan Check Fees
Plan Check Fees (up to 499 sq. ft.) Each $2,453
Plan Check Fees (500 - 999 sq. ft.) Each $3,563
Accessory Dwelling Unit (ADU) - Inspection Fees
Inspection Fees (up to 499 sq. ft.) Each $2,612
Inspection Fees (500 - 999 sq. ft.) Each $3,656
Address Assignment Per hour $233
Board of Appeals Per hour $266
Clerical Fee 1/2 hour $117
Alternate Materials and Methods of Construction Per hour $255 Antenna—Telecom Facility
Radio Each $458
Cellular/Mobile Phone, alterations to existing facility Each $655 Cellular/Mobile Phone, free-standing Each $2,271
Cellular/Mobile Phone, attached to building Each $1,194 Arbor/Trellis Each $655
Awning/Canopy (supported by building) Each $655
Balcony Addition Each $1,588
Battery Energy Storage System up to three (3) $655
Each Additional Each $386
Below Market Rate
Escrow Inspection % of Sale Price 0.52%
CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Work Item Unit FY 2024-25 Proposed Fee
CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Carport Each $916
Certifications
Special Inspector Qualifications (initial review) Each $511 Special Inspector Qualifications (renewal / update) Each $233 Chimney (new) Each $916
Chimney Repair Each $517
Commercial Coach (per unit) Each $1,194
Covered Porch Each $916
Deck (wood) Each $916
Deck Railing Each $517
Deferred Submittal (2 hour minimum) Each $266
Demolition
Multi-Family and Commercial (up to 3,000 sf) Base $772
Multi-Family and Commercial (each additional 3,000 sf) Each 3,000 sf $269 Residential (R-3 Occ) (up to 3,000 sf) Base $772
Residential (R-3 Occ) (each additional 3,000 sf) Each 3,000 sf $269 Swimming Pool Residential Each $517
Swimming Pool Multi-Family and Commercial (up to 3,000 sf) Base $778 Swimming Pool Multi-Family and Commercial (each additional 3,000 sf) Each 3,000 sf $261 Disabled Access Compliance Inspection Per hour $266
Door
New door (non structural) Each $386
New door (structural shear wall/masonry) Each $655
Duplicate / Replacement Job Card Each $117
Electric Vehicle Charging Station Each $266
Extensions
Plan Check Applications (within 180 days of Submittal) 1 hour $266 Permits (within 180 days of Issuance)
Start construction, without plans 1/2 hour $139
Resume or complete construction, without plans 1/2 hour $139 Start construction, with plans 1 hour $277
Resume or complete construction, with plans 2 hours $555 Fence
Non-masonry, over 7 feet in height Up to 100 l.f. $517
Non-masonry, each additional 100 l.f. Each 100 l.f. $131 Masonry, over 7 feet in height Up to 100 l.f. $916
Masonry, each additional 100 l.f. Each 100 l.f. $522
Fireplace
Masonry each $916
Pre-Fabricated/Metal each $517
Work Item Unit FY 2024-25 Proposed Fee
CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Flag pole (over 20 feet in height) each $517
Foundation Repair each $1,178
Inspections
Pre-Inspection Fee Per hour $266
Standard Inspection Hourly Rate Per hour $266
Progress Inspection Per hour $266
Partial Inspection Per hour $266
Courtesy Inspection - 2 hour minimum Per hour $266
Cancelled inspection w/out advance notice Per hour $266 Reinspection Per hour $266
Outside of normal business hours (2 hour minimum) Per hour $308 Inspection Supplemental Fee (Projects that require more inspections than average, the Building Official may charge additional inspection fees) First 1/2 hour minimum First 1/2 hour $131
Each Additional hour Per hour $261
Lighting pole Each $655
each additional pole Each $269
Modular Structures Each $933
Modification of Technical Code 1 hour $266
Occupancy
Certificate of Occupancy/Completion Each $517
Temporary Occupancy Permit Per six months $517
Partition—Commercial, Interior (up to 30 l.f.) Up to 30 l.f. $786 Additional partition Each 30 l.f. $261
Partition—Residential, Interior (up to 30 l.f.) Up to 30 l.f. $517 Additional partition Each 30 l.f. $261
Patio Cover / Gazebo
Wood frame Up to 300 sf $933
Metal frame Up to 300 sf $933
Other frame Up to 300 sf $933
Additional patio Each 300 sf $400
Enclosed prefabricated Sun Room Up to 300 sf $916
Photovoltaic System
Residential
Systems up to 15kW Each $450
Each Additional kW Above 15kW Each Addl kW $15
Multi-Family and Commercial:
Systems up to 50kW up to 8 kW Each $1,000
Multi-Family Res/Commercial, each additional 1 kilowatt Each 1 addl kW $7 Each Additional kW Above 250kW Each addl kW $5
Work Item Unit FY 2024-25 Proposed Fee
CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Thermal System
Residential:
Systems up to 10kW Each $450
Each Additional kW Above 10kW Each addl kW $15
Multi-Family and Commercial:
Systems up to 30kW Each $1,000
Each Additional kW between 30kW and 260kW Each addl kW $7 Each Additional kW Above 260kW Each addl kW $5
Pile Foundation
Cast in Place Concrete (first 10 piles) Up to 10 $1,194 Additional Piles (increments of 10) Each 10 $800
Driven (steel, pre-stressed concrete) Up to 10 $1,194
Additional Piles (increments of 10) Each 10 $800
Product Review Per hour $255
Plan Review
Standard Plan Review Hourly Rate Per hour $277
Overtime Plan Review (2 hour minimum) Per hour $325
Pre-Submittal Plan Review (2 hour minimum) Per hour $277 Expedited Plan Review Each 1.5x Plan Check Fee
Plan Review Supplemental Fee (after 2nd review)
First 1/2 hour minimum First 1/2 hour $278
Pre-Construction Meeting each $450
Remodel—Residential
Kitchen (up to 300 sq. ft.) Each $1,039
Bath (up to 300 sq. ft.) Each $1,039
Other Remodel (up to 300 sq. ft.) Each $916
Additional remodel (per sq. ft. above 300) Per s.f. $2.29 Other Remodel (1000 sq. ft.) Each $2,516
Additional remodel (per sq. ft. above 1000) Per s.f. $0.53 Other Remodel (2500+ sq. ft.) Each $3,316
Additional remodel (per sq. ft. above 2500) Per s.f. $0.27 Re-roof
Residential (maximum $500 per building) Each 100 sf $25 Multi-Family Dwelling (maximum $500 per building) Each 100 sf $25 Commercial
Commercial (first 5,000 sf) Each $639
Commercial (each additional 2,500 sf) Each 2,500 sf $261 Retaining Wall (concrete or masonry)
Standard (up to 50 l.f.) Up to 50 l.f. $1,194
Additional retaining wall Each 50 l.f. $800
Work Item Unit FY 2024-25 Proposed Fee
CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Special Design, 3-10' high (up to 50 l.f.) Up to 50 l.f. $1,733 Additional retaining wall Each 50 l.f. $1,061
Special Design, over 10' high (up to 50 l.f.) Up to 50 l.f. $1,994 Additional retaining wall Each 50 l.f. $1,322
Gravity/Crib Wall, 0-10' high (up to 50 l.f.) Up to 50 l.f. $1,733 Additional Gravity/Crib Wall Each 50 l.f. $1,061
Gravity/Crib Wall, over 10' high (up to 50 l.f.) Up to 50 l.f. $1,994 Additional Gravity/Crib Wall Each 50 l.f. $1,322
Revisions $266
Sauna—steam Each $916
Siding
Stone and Brick Veneer (interior or exterior) Up to 400 sf $639 All Other Up to 400 sf $508
Additional siding Each 400 sf $131
Signs
Directional Each $517
Each additional Directional Sign Each $269
Ground/Roof/Projecting Signs Each $517
Master Plan Sign Check Each $517
Rework of any existing Ground Sign Each $517
Other Sign Each $517
Reinspection Fee Each $124
Wall/Awning Sign, Non-Electric Each $386
Wall/Awning Sign, Electric Each $517
Skylight
50 sf or less (cumulative area) Each $517
Greater than 50 sf or structural Each $269
Stairs—First Flight First flight $517
Each additional flight Per flight $269
Storage Racks
0-8' high (up to 100 l.f.) First 100 l.f. $655
each additional 100 l.f. Each 100 l.f. $131
over 8' high (up to 100 l.f.) First 100 l.f. $786
each additional 100 l.f. Each 100 l.f. $131
Stucco Applications
Base Up to 400 sf $508
Additional Stucco Application Each 400 sf $131
Swimming Pool/Spa
Vinyl-lined Each $1,194
Fiberglass Each $1,194
Work Item Unit FY 2024-25 Proposed Fee
CITY OF CUPERTINO, CA
Resolution 24-XXX
Fees Effective July 14, 2024
Schedule D - Table 3 Miscellaneous Items
Gunite (up to 800 sf) Each $1,716
Additional pool (over 800 sf) Each 100 sf $400
Commercial pool (up to 800 sf) Each $2,910
Additional pool (over 800 sf) Each 100 sf $800
Spa or Hot Tub (Pre-fabricated) Each $517
Technology Fee Per Permit 5.8%
Temporary Structures Each $786
Tenant Improvement Preparation Each $517
Window or Sliding Glass Door
Replacement (first 8 windows) First 8 $378
Replacement (each additional 8 windows) Each 8 $131
New Window (non structural) Each $324
New window (structural shear wall/masonry) Each $458
Bay Window (structural) Each $458
Planning Department Review fee (New Construction and Additions) (Payable at permit submittal) Each 20% of plan review and
inspection fees
Planning Hourly Rate (Misc Reviews) Per hour Refer to Schedule C Housing Mitigation In-lieu fees (Payable at Building Permit issuance) Per sq. ft. Refer to Schedule C Zoning, Planning, Municipal Code fees (Payable at Building Permit issuance) Per sq. ft. Refer to Schedule C Wireless Master Plan fee (Payable at Building Permit issuance) Each Refer to Schedule C Refunds - Plan Check Fees
1st review not started (within 3 Business of Submittal) 100% of Plan Review Fees Plan review more than 3 Business Days after the Date of Submittal No refund Refunds - Building Permit Fees
No inspections and permit is active (not expired) 80% of permit fees No inspections and permit is expired No refund
Inspections were provided No refund
Work without permit - based on current permit and plan check fees Double fees NOTE:
Fee Adjustments: In instances where the strict application of fees from this schedule would constitute a substantial inequity to an applicant or to the City, the Chief Building Official shall be authorized to adjust such fees on a case-by-case basis. Any such adjustments shall be recorded in writing and entered into the appropriate files.
Fees identified in this Table consist of 50% Plan Review Fee and 50% Inspection Fee