CC 11-19-2024

#12

Lifetime Activities Contract

Supplemental Report

CITY COUNCIL STAFF REPORT
SUPPLEMENTAL 1
Meeting: November 19, 2024

Subject
Award a contract to Lifetime Activities Inc. for Sports Center Instruction, Court Maintenance, and Retail Services at the Cupertino Sports Center for a total not‐to‐exceed amount of $24,000,000.

Recommended Action

1. Award a 10‐Year contract to Lifetime Activities Inc. to provide Sports Center Instruction, Court Maintenance, and Retail Services at the Cupertino Sports Center for a total not‐to‐exceed amount of $24,000,000 with the estimated revenue amount of $3,450,000; and

2. Authorize the City Manager to execute the contract with Lifetime Activities Inc. consistent with City Council direction.

Supplemental Report
Staff’s responses to questions received from councilmembers are shown in italics.

Q1: Since there is proposed facility changes for Cupertino Sports Center, has this item gone to the Parks and Rec Commission for advise? (Chao)

Answer: Contracts and amendments are not reviewed by the Parks and Recreation Commission.

Q2: Some residents are not happy with the Lifetime. Has any satisfaction survey been conducted for their services?(Chao)

Answer: Surveys are provided to participants of Lifetime on a quarterly basis. On average, Overall Enjoyment & Quality of Instruction, 80% extremely satisfied, 20% Somewhat satisfied.

Q3: When was the last time we sought other vendors for this contract? (Chao)

Answer: As stated in the staff report on page 2, a request for proposals was issued September 6, 2024.

Q4: Whatʹs the timeline for this contract renewal? Can we do a an RFP? (Chao)

Answer: The current contract expires in December 2024. The draft agreement attached to the staff report is the result of an RFP that was issued September 6, 2024 (See page 2 of the staff report).

Q5: What has led to the decision to convert courts 9, 10 from tennis to pickleball? Have other courts been considered? Will the conversion be permanent or would the courts be double use? (Chao)

Answer: The Sports Center has received many inquiries regarding pickleball options at the Sports Center.

As stated in the staff report, “[…]  move the current pickleball courts away from the near by condominiums.” The Cupertino Sports Center has had three tennis Courts (16, 17, 18) that are painted for pickleball since 2016. The current proposal is to return courts 16, 17, and 18, which back up to the Commons Condominiums, back to tennis only and paint two tennis courts, 9 and 10, for pickleball. Tennis Courts 9 and 10 are on the DeAnza Blvd side of the Sports Center. The conversion would be to pickleball only.  Based on the proposal, there will be two tennis courts painted for pickleball, instead of three.

Q6: Howʹs the current tennis court usage (Chao)?

Answer:  Currently reservations for tennis courts average 570 per week with a total of 925 available reservations.

Q7: Whatʹs the percentage of Sports Center users that are Cupertino residents (Chao)?

Answer: Cupertino residents

Q8: Whatʹs the reservation policies for either the tennis courts or any newly added pickleball courts (Chao)?

Answer: While this information is not germane to the Council’s decision in approving the contract, staff is including the following statistics for reference.  To reserve a tennis or pickleball court you must be a member of the Cupertino Sports Center. Reservations can be made online, 7 days in advance, on a first come, first served basis.

Q9: Any consideration for the noise level of pickleball courts? (Chao)

Answer: There are currently three tennis courts at the sports center painted for pickleball. These

courts are near other tennis courts and The Commons Condominiums. Tennis is already playing next to pickleball at the Sports Center. What the proposal does is convert the three tennis courts painted for pickleball near The Commons back into tennis courts and only replace two of the

pickleball painted tennis courts on the street (DeAnza Blvd) side of the Sports Center. Tennis would gain back one court from what is there now.

Q10: Any information on pickleball courts in other cities in a centralized sports facility? (Chao)

Answer: Sunnyvale tennis center has 13 dedicated tennis courts, 2 shared use tennis/pickleball courts, and 4 permanent pickleball courts. Staff does not have further information on other cities at this time.

_____________________________________

Prepared by: Jennifer Koverman, Recreation Manager
Rachelle Sander, Director of Parks and Recreation
Reviewed by: Tina Kapoor, Interim Assistant City Manager Chris Jensen, City Attorney
Approved for Submission by:  Pamela Wu, City Manager
CC 11-19-2024

#14

First Quarter Financial Report FY
2024-25

Supplemental Report
1 CITY COUNCIL STAFF REPORT
SUPPLEMENTAL 1
Meeting: November 19, 2024

Agenda Item #14

Subject
City Manager’s First Quarter Financial Report for Fiscal Year (FY) 2024-25

Recommended Action
A. Accept the City Manager’s First Quarter Financial Report for Fiscal Year 2024-25; and B. Adopt Resolution No. 24 -XXX approving Budget Modification No. 2425 -367, increasing appropriations by $331,128 fund by unassigned fund balance

Background:

The below table corrects the First Quarter Budget Adjustments table in the staff report to correct the spelling of chief.

Fund Department Revenue Expenditure
Change in
Fund
Balance
Proposal

GENERAL FUND
100 General Fund Admin Services - 5 0,000 (50,000) Chief Negotiator for successor agreements 100 General Fund Admin Services - 75,000 (75,000) General Liablity potential settlement costs 100 General Fund Admin Services - 10,000 (10,000) American Sign Language Translation Services 100 General Fund Innovation & Technology - 314,998 (314,998) Correctly allocate deleted IT Manager (see reduction in internal service funds)
100 General Fund Public Works - 3 6,822 (36,822) Purchase of a new bio holding tank 100 General Fund Public Works - 25,000 (25,000) Replace structural column and foundation at materials bunker 100 General Fund Public Works - 24,490 (24,490) Replace leaking fire hydrant at Creekside 100 General Fund Public Works - 41,246 (41,246) QCC Spot Coolers Purchase - 577,556 (577,556)

SPECIAL REVENUE FUNDS
260 Community Development
Block Grant
Community Development - 53,570 (53,570) D evelop the 2025-2030 Consolidated Plan - 53,570 ( 53,570)

INTERNAL SERVICE FUNDS
610 Innovation & Technology Innovation & Technology - ( 314,998) 314,998 Correcting position elimination 610 Innovation & Technology Innovation & Technology - 1 5,000 (15,000) Overtime - (299,998) 2 99,998
TOTAL ALL FUNDS -$ 331,128$ (331,128)$

TOTAL GENERAL FUND

TOTAL SPECIAL REVENUE FUNDS

TOTAL INTERNAL SERVICE FUNDS
2 Staff’s responses to questions received from councilmembers are shown in italics.

Q1: In the past, the Q1 report for work program items are also included. Please include that. (Council member Chao)
Staff Response: The City Work Program Q1 report was published separately as an informational memorandum on October 24, 2024. This can be found at the Informational memos web page and the City Work Program web page. All project updates are also reflected on the City Work Program Dashboard.

Q2: The staff report states "City staff recommends adjustments of $331,128 in new appropriations, funded by one-time unassigned fund balance." I looked for the total " $331,128" in the staff report and did not find where else it occurred. Please list the new appropriations, which totals " $331,128". (Council member Chao) Staff Response: The following table along with detailed descriptions of items requested are on page 23 of the staff report . This same chart can also be found in the First Quarter Financial Report (Attachment A)

Q3: Staff report states "Throughout FY 2015-16 through FY 2024-25, the City applied for 43 competitive grants totaling $54.5 million. To date, the City has been awarded $32.4 million.

Also, during FY 2021-22 through FY 2024-25 the City applied for 26 non-competitive grants totaling $4.6 million." I see a list of current grants in Attachment H. Please provide the list of the 43 grants applied in the ten years from FY 2015-16 through FY 2024-25 and which ones are granted for how much. Please include the matching fund required from the city for each grant. (Council member Chao)
Staff Response: Attachment H details the status and dollar amount for the 43 Competitive Grants.

The first grant tracking list originally captured all competitive grants applied for during two fiscal years (FY 2021 -22 and FY 2022 -23). Since then, staff has reported on grants applied for through the current fiscal year. Although the grants in the spreadsheet reflect 43 competitive grants, this list

3 may not include every grant applied for during FY 2015 -16 through FY 2020-21. Any matching fund requirements have been added to the tracking spreadsheet, which is provided as an attachment to this document.

Attachments Provided with Original Staff Report:

A – Fiscal Year 2024-25 First Quarter Financial Report
B – Draft Resolution
C – Description of Carryovers and Adjustments as of September 30, 2024 D – Description of Budget Transfers as of September 30, 2024 E – First Quarter Recommended Budget Adjustments
F – FY 2023-24 Special Projects Update
G – FY 2024-25 First Quarter Special Projects Update as of September 30, 2024 H – Competitive and Non-Competitive Citywide Grants Tracking I – FY 2024-25 First Quarter CIP Project Status

Attachments Provided with Supplemental 1:

J – Competitive Grants Revised
Department Name of Grant Description of Grant
Requested Grant
Amount
Date
Applied Date Due
Status (Grant
Awarded,
Pending Results,
Grant Denied)
Grant Amount
Awarded
City Matching Funds
Required? Yes/No; If
yes, please include
amount Date Awarded
Administration National Association of City and County Health Officials (NACCHO) Respond, Innovate, Sustain, and
Equip (RISE) Awards
To provide resources to the MRC network to
support COVID‐19 response efforts
$25,000  3/4/2022 3/4/2022 Grant  Awarded $25,000  No 8/11/2022 Administration Local Governments: Connecting Neighbors to Neighbors
California Office of the Governor,
CalVolunteers program funding for the Block
Leader Program to hold events that expand
networks of neighbors within the community
$222,233  6/16/2023 6/16/2023 Grant  Awarded $222,233  No 7/17/2023 Administration/Public Works Emergency Radio Replacement Project To purchase digital radio communication devices (handheld radios, headset and ear
plugs, antennas, vehicle radio units) to replace
the analog system
$80,000  6/14/2024 6/14/2024 Grant  Denied N/A N/A N/A
Administration/ Information &
Technology
Cybersecurity Exercise Planning To hire a consultant to conduct Cybersecurity Exercise Planning
$90,000  6/14/2024 6/14/2024 Grant  Denied N/A N/A N/A
Administration/ Information &
Technology
Intrusion Protection, Security, and Intelligence To  improve the physical security and access controls at City of Cupertino facilities.

Currently, not all key exterior doors at City
facilities are controlled by an access control
system
$180,000  6/14/2024 6/14/2024 Grant  Denied N/A N/A N/A Information & Technology California  Automated Permit Processing (CalAPP) Program
Grant to enhance solar permitting applications $60,000  3/13/2023 7/1/2027 Grant  Awarded $60,000  No 4/4/2023 Community Development
Department
2020 Local Early Action Planning (LEAP) Grants
Program
CA Dept of Housing & Community
Development (HCD) funding to accelerate
progress of Housing Element towards state
housing goals
$300,000  7/1/2020 7/1/2020 Grant  Awarded $300,000  No 10/6/2020 P
ublic Works TIRCP (Transit and Intercity Rail Program) 5‐year expansion of Via shuttle, including partnership with City of Santa Clara
$8,465,000  3/3/2022 3/8/2022 Grant  Awarded $8,465,000  No ʺrequiredʺ match, but City must fund the
non grant‐funded
balance of the program,
or $8,465,000.  This is
shared with City of
Santa Clara.
7/11/2022
Information & Technology and
C
ommunity Development
Department
Dept. of Housing and Community Development Financial  assistance for implementation of softwares that accelerate and streamline
Housing Production
$310,000  3/20/2020 12/31/2022 Grant  Awarded $310,000 N/A 3/24/2020 Public Works California Electric Vehicle Infrastructure Project  Purchase and installation of EV charging infrastructure at publicly‐owned sites ($4,500
per charging port)
$130,500  12/22/2020 12/22/2020 Funds  Partially
Reserved
$130,500  City is responsible for
costs in excess of $4,500
per charging port)
N/A
Public Works HSIP (Highway Safety Improvement Program) Improving  safety at signalized intersections $2,005,900  9/12/2022 9/12/2022 Grant  Deni ed N/A N/A N/A Public Works HSIP (Highway Safety Improvement Program) Improving  safety on roadway segments $3,561,800  9/12/2022 9/12/2022 Grant  Awarded $3,205,620  $356,180  3/15/2023 Public Works HSIP (Highway Safety Improvement Program) Improving  safety on roadway segments $4,450,200  9/12/2022 9/12/2022 Grant  Denied N/A N/A N/A Public Works OBAG (One Bay Area Grant) Cycle 3D e Anza Blvd buffered bike lanes $500,000  7/27/2022 7/27/2022 Grant  Denied N/A N/A N/A Public Works Safe Streets 4 All (SS4A) Bollinger Road road diet traffic analysis, outreach and engi
neering design
$532,000  7/10/2023 7/10/2023 Grant  Awarded $425,600  $106,400  12/13/2023 Public Works Federal Community Project Funding Grant FY22 Funding  for Jollyman All Inclusive Play Area $1,000,000 4/25/2022 6/10/2022 Grant  Denied $1,000,000 N/A N/A Public Works Federal Community Project Funding Grant FY22 Funding  for Cupertino Library Expansion project
$1,000,000 3/25/2021 6/10/2022 Grant  Awarded $1,000,000 No 2/15/2024 Public Works
State Specified Grant
Funding for Jollyman All Inclusive Play Area $1,000,000 3/17/2022 7/1/2022 Grant  Awarded $1,000,000 No N/A Public Works PG&E Community Grant Funding for J ollyman All Inclusive Play Area $25,000 8/8/2022 9/1/2022 Grant  Awarded $25,000 No 10/3/2022 Public Works McClellan Road Bridge Reconstruction State Funding Grant $7,500,000  3/17/2022 7/1/2022 Grant  Awarded $5,000,000  No N/A Public Works Santa Clara County AIPG  Funding for Jollyman All Inclusive Play Area $1,440,000 10/10/2018 10/12/2018 Grant  Awarded $1,440,000 $1,591,799 5/13/2019 Public Works McClellan Road Bridge Reconstruction Federal Funding Grant ‐ Ro Khanna $850,000  3/14/2023 3/17/2023 Pending  Results N/A No N/A Competitive Citywide Grants Tracking - FY25 First Quarter Update CC 11-19-2024 Item No. 14. Attachment J
Department Name of Grant Description of Grant
Requested Grant
Amount
Date
Applied Date Due
Status (Grant
Awarded,
Pending Results,
Grant Denied)
Grant Amount
Awarded
City Matching Funds
Required? Yes/No; If
yes, please include
amount Date Awarded
Competitive Citywide Grants Tracking - FY25 First Quarter Update Public Works TDA3   Funding for Tamien Innu (I‐280 Trail)‐East $1,015,022   12/1/2021 12/1/2021 Grant  Awarded $1,015,022   $830,000 (30% of total project cost ‐ includes
both Measure B Grants)
5/25/2022
Public Works 2016  Measure B Capital Projects Funding  for Tamien Innu (I‐280 Trail)‐East $920,978   12/1/2021 12/1/2021 Grant  Awarded $920,978   $830,000 (30% of total project cost ‐ includes
both Measure B Grants)
11/12/2021
Public Works Sustainable  Transportation Planning Grant Bollinger  Road road diet traffic analysis, outreach and engineering design
$318,707  3/14/2023 3/14/2023 Grant  Denied N/A N/A N/A Public Works 2016  Measure B Capital Projects Funding  for Tamien Innu (I‐280 Trail)‐Central  $460,000  7/1/2020 7/1/2020 Grant  Awarded $460,000   $1,795,000 (30% of project cost ‐ includes
both Measure B Grants)
7/14/2020
Public Works 2016  Measure B Capital Projects Funding  for Tamien Innu (I‐280 Trail)‐Central  $3,725,000  7/1/2020 7/1/2020 Grant  Awarded $3,725,000   $1,795,000 (30% of project cost ‐ includes
both Measure B Grants)
7/14/2020
Public Works Office  of Traffic Safety (OTS) Bicycle  and Pedestrian Education $152,000   1/31/2024 1/31/2024 Grant  Awarded $160,000   No 10/22/2024 Public Works 2016  Measure B Noise Abatement Program Funding  for Tamien Innu (I‐280 Trail)‐Central  $15,000  3/23/2023 3/31/2023 Grant  Denied N/A N/A N/A Public Works State  of California Proposition 68 Funding  for Wilson Park Basketball Court $214,549   12/6/2021 N/A Grant  Awarded $214,549   Completed. 1/21/2022 Public Works BPMP  (Bridge Preventative Maintenance Program) Funding  for recommended preventative maintenance on local roadway bridges
$1,144,472  9/30/2020 N/A Grant  Awarded $1,144,472   $148,278  4/12/2023 Public Works HBP  (Highway Bridge Program) Repairs  to bridge 37C0011, SCB over Stevens Creek
$688,000  10/5/2018 N/A Grant  Awarded $688,000   $172,000  10/12/2018 Public Works BAAQMD  ‐ TFCA 40% Fund (Transportation Fund for Clean Air)
Funding for year three (FY25) of Silicon Valley
(SV) Hopper.
$500,000  3/14/2024 3/15/2024 Grant  Awarded $500,000   No ʺrequiredʺ match, but City must fund the
non grant‐funded
balance of the program.

Cityʹs contribution is
$882,704.

N/A
Public Works EPA  ‐ CPRG (Climate Pollution Reduction Grants Program)
Funding for years three and four of SV Hopper $4,939,988   3/27/2024 4/1/2024 Pending  Results N/A N/A N/A Public Works  Community Decarbonization Engagement Grant Competitive  grant for community engagement around decarbonization topics from SVCE.

Grant Funds shall be disbursed to Recipient on
a reimbursement basis.
$100,000  4/1/2022 4/4/2022 Grant  Awarded $111,500   No 2/2/2023 Parks and Recreation NRPA:  Supporting Healthy Aging Through Parks and Recreation 3.0
With the support of the Centers for Disease
Control and Prevention (CDC), NRPA is
offering instructor training grants for five
arthritis‐appropriate, evidence‐based
interventions (AAEBIs). Essentially, these are
physical activity classes that are proven to help
people with arthritis symptoms but can actually
benefit anyone.
$0  10/20/2023 10/23/2023 Grant  Awarded $0  ‐ Grant provides instructor training and
material/equipment for
the class
No 11/28/2023
Public Works ‐ Environmental
Programs Division
EPA Recycling Education and Outreach Improve  the effectiveness of residential and community recycling and composting programs
through public education and outreach.

Increase collection rates and decrease
contamination across the nation
$1,400,000 2/15/2023 2/15/2023 Grant  Denied N/A N/A N/A Public Works EPA  ‐ CPRG (Climate Pollution Reduction Grants Program)
Coalition member application with San Jose and
SVCE as leads. Grant seeks to establish funding
pool for  muni building electrification as part of
Measure #2 in County PCAP.
$1,951,321  4/1/2024 4/1/2024 Grant  Denied N/A N/A N/A Department Name of Grant Description of Grant
Requested Grant
Amount
Date
Applied Date Due
Status (Grant
Awarded,
Pending Results,
Grant Denied)
Grant Amount
Awarded
City Matching Funds
Required? Yes/No; If
yes, please include
amount Date Awarded
Competitive Citywide Grants Tracking - FY25 First Quarter Update Public Works EPA  ‐ CPRG (Climate Pollution Reduction Grants Program)
Coalition member with Sunnyvale as lead.

Grant seeks to establish regional reusable to‐go
foodware systems including niche for prepared
food recovery closed systems. (Sunnyvale, San
Jose, Mountain View, San Benito County,
Cupertino)
Cupertino will not
receive funds directly
but would be part of
a regional effort.
4/1/2024 4/1/2024 Grant  Denied N/A N/A N/A
Public Works and
Administration
CalOES Hazard Mitigation Grant Program Project
Subapplication
Cupertino Civic Center Plaza Microgrid study
and construction
$979,402 6/17/2021 6/17/2021 Grant  Awarded N/A N/A.  Grant was returned.
2/1/2023
Public Works Extreme  Heat and Community Resilience Program (EHCRP)
Integrated Climate Adaptation and Resilience
Program and administered by the Governor’s
Office of Planning and Research (OPR)
$900,000  5/7/2024 10/1/2024 Pending  Results N/A No N/A Public Works One  Bay Area Grant (OBAG) Cycle 2S t e v e n s  Creek Blvd Protected Bike Lanes Phase 2 $807,000  7/28/2016 N/A Grant  Awarded $807,000   Yes, $93,000 (11.47% of project cost)
1/24/2022
Public Works Charging  and Fueling Infrastructure (CFI) Discretionary Grant Program
San Jose and SVCE as leads on this federal
bipartisan infrastructure grant for installing EV
Chargers near MFDs. $15M ($7.5M for San Jose,
$7.5M for SVCE territory) There is a 20% match
requirement that SVCE will contribute for
projects in SVCE territory.
$532,000  9/11/2024 N/A Pending  Results N/A No N/A
54,491,072                          32,355,474
$54,491,072
CC 11-19-2024

#16

FY 2024-25 One-time Funds
Allocation Plan

Supplemental Report
1 CITY COUNCIL STAFF REPORT
SUPPLEMENTAL 1
Meeting: November 19, 2024

Agenda Item #16

Subject
Allocation plan for funds uncommitted from the Sales Tax Repayment reserve.

Recommended Action
Option A:

A. Adopt Option A

Option B:

A. Adopt Option B
B. Adopt Resolution No. 24‐XXX approving budget modification No. 2425‐366, increasing appropriations by $11,688,705
C. Adopt Resolution No. 24‐XXX amending the Unrepresented Employees’ Compensation Program
D. Approve new three‐year limited term Grants Analyst position for grants management E. Approve new Assistant Director of Administrative Services, Grants Analyst, Senior Business Systems Analyst and Supervising Code Enforcement classifications

Option C:

A. Adopt Option C
B. Adopt Resolution No. 24‐XXX approving budget modification No. 2425‐366, increasing appropriations by $11,688,705
C. Adopt Resolution No. 24‐XXX amending
the Unrepresented Employees’ Compensation
Program
D. Approve new three‐year limited term Grants Analyst position for grants management E. Approve new Assistant Director of Administrative Services, Grants Analyst, Senior Business Systems Analyst and Supervising Code Enforcement classifications

Background:

The below table corrects the CalPERS Projected Funding Status table in the staff report to

2 revise the legend description.

Staff’s responses to questions received from councilmembers are shown in italics.

Q1: Why was paying off the City’s debt not considers? (Council member Chao) Staff Response: The 2020 Certificates of Participation (COPs) are non‐callable, meaning they cannot be prepaid before their scheduled
maturity. This restricts the Cityʹs ability to pay off this debt early, even if sufficient cash is available.

Q2: How does 115 Pension fund work with Additional Discretionary Payment? (Council member Moore)
Staff Response: The Section 115 Trust provides a strategic reserve to manage pension obligations, offering public agencies flexibility to set aside funds for future costs. If desired, these funds can be utilized  to  make  an  Additional  Discretionary  Payment  (ADP),  reducing  the  Unfunded  Accrued Liability (UAL) and interest burden while stabilizing long‐term pension contributions. The City created the 115 Pension to retain investment authority over these funds, and to use as a smoothing tool  should  CalPERS  returns  fall  short  or  actuarial  assumption  changes  and  result  in  higher payments.

Q3: In Option A, if inflation outpaces investment returns why would the City invest any of its money? (Council member Moore)
Staff  Response:  Legal  and  accounting  standards  require  the  City  to  maintain  certain  reserves  to reduce the risk of insolvency. There may be prudential reasons for the City to maintain additional reserves above the required minimum levels. The investment of these funds is a critical strategy to combat  the  impacts  of  inflation,  which  historically  has  outpaced  the  returns  available  through

3 permissible investments under the California Government Code. By actively managing the City’s portfolio,  we  seek  opportunities  to  enhance  returns  while  maintaining  compliance  with  safety, liquidity, and yield priorities.

Active investment management allows the City to strategically adjust the portfolio to respond to market conditions, mitigate risks, and protect purchasing power over time. This approach balances the need to retain adequate reserves for operational stability and service delivery while maximizing the value of public funds to support long‐term fiscal health.

Q4:  Can  you  provide  a  summary  of  Service  Level  Reductions  (SLRs)  and  other  budget reductions (Council member Chao)
Staff  Response:  For  fiscal  year  2023‐24  budget  reductions  are  listed  on  pages  48‐52  of  the  final budget document.   In addition, 13 positions were also eliminated as shown on page 42, both are included for reference below:

For  fiscal  year  2024‐25  service  level  reductions  are  listed  on  pages 52‐54  of  the  final  budget
document.  In addition, five positions were also eliminated as shown on page 46, both are included for reference below:

4 Description
FY 2023‐24
Original
Budget
FY 2023‐24
Proposed
Budget  Reduction  Service Impact
COUNCIL AND COMMISSIONS

Materials   $         286,824     $          161,259     $   125,565   Reduced meeting expenses, general supplies, and food and
drink for Council meetings.

TOTAL COUNCIL AND

COMMISSIONS
$         286,824    $          161,259    $   125,565

ADMINISTRATION

Materials   $         535,812     $          400,223     $   135,589   This reduction is primarily related to savings in supplies,
meeting expenses, and
conference and travel. This
should have minimal impact
on services throughout the
department.

Contract Services   $      1,362,790     $          941,380     $   421,410   This reduction is primarily related to contract negotiations
to reduce cost for services
throughout the department.

TOTAL ADMINISTRATION   $      1,898,602    $       1,341,603    $   556,999

INNOVATION & TECHNOLOGY

Materials   $      2,794,442     $       1,812,505     $   981,937   Reduced applications utilized by staff, residents, and
customers. Commissioners and
part time staff limited to E‐
mail; Prolonged tech refresh
cycles and significant reduction
in replacement parts and
supplies. Reduced Training
and Conferences for
department. Drone program
and training reduced, and
eliminate Wi‐Fi in parks.

Contract Services   $         791,240     $          620,119     $   171,121   Reduce expert technical training; less outside technical
support, and reduced
LaserFiche document scanning.

Reduced maintenance of
equipment
TOTAL INNOVATION &

TECHNOLOGY
$      3,585,682    $       2,432,624    $1,153,058

5 ADMINISTRATIVE SERVICES

Materials   $         186,223     $          108,808     $     77,415   Reduced conference attendance, office and general
supplies, recruitment
advertisements, printing,
citywide coffee and tea and
reduced citywide employee
events.

Contract Services   $      4,152,414     $       4,020,746     $   131,668   Reduced citywide trainings, reduced executive recruitments
and reduced consultant costs.

TOTAL ADMINISTRATIVE

SERVICES
$      4,338,637    $       4,129,554    $   209,083

PARKS AND RECREATION

Part‐Time Staffing ‐ Department
Wide
$1,606,998   $1,381,602   $225,396   Reduced PT Staff budgets to minimum levels necessary to
operate currently open
Recreational facilities and
ongoing programs.

Materials  $779,829   $457,723   $322,106   Simplification or streamlining of current programs and events
and fewer marketing efforts
and printed materials thereof.

Removed budgets for
nonessential trainings and
conferences in the Department
and additional savings from
reduced expenditures for
meetings and events for staff.

Contract Services  $4,532,489   $3,953,917   $578,572   Reduced expansion of current or new offerings for contracted
programs, camps, and classes.

Reduction of free events
offered and removed budget to
cover fees for festivals
TOTAL PARKS AND

RECREATION
$6,919,316   $5,793,242   $1,126,074

COMMUNITY DEVELOPMENT

Materials  $1,186,321   $1,121,866   $64,455   Reduced conference attendance, professional
development opportunities,
and materials and supplies.

Contract Services  $655,080   $565,580   $89,500   Termination of on‐call contracts and negotiation of
new contracts will reduce
service level and response time.

TOTAL COMMUNITY

DEVELOPMENT
$1,841,401   $1,687,446   $153,955

6 PUBLIC WORKS

Materials  $5,439,339   $4,852,483   $586,857   Reduced or eliminated office and general supplies; meetings,
conference and trainings;
memberships; safety
equipment not covered under
the MOU; small tools and
equipment; and printing and
advertising.

Contract Services  $5,460,208   $4,859,824   $600,384   Delayed services and response to work requests; deferred
maintenance at City parks,
facilities, streets and trees.

Special Projects  $5,290,259   $4,496,264   $793,995   Delayed or deferred sidewalk repairs and pavement
maintenance.

Capital Outlays  $1,100,280   $880,224   $220,056   Delayed or deferred pavement maintenance, which will lower
the Cityʹs Pavement Condition
Index (PCI) rating.

TOTAL PUBLIC WORKS  $17,290,086   $15,088,795   $2,201,292

TOTAL    $    36,160,548    $     30,634,523    $5,526,026

Staffing Changes

7 Department  Grouping  Service‐Level
Reduction   Fiscal Impact   Service‐Level Impact
Narrative
Parks and Recreation  Community Benefit  Reduce 4th of July Funding   $      (123,344)  Elimination of 4th of July
evening fireworks.

TOTAL COMMUNITY BENEFIT  $      (123,344)

Administration   Fiscal
Accountability
Contract Services and
Materials   $      (226,561)
Potential need for
additional appropriations
if unanticipated legal
costs arise
Administration   Fiscal
Accountability
Material operations
that are no longer
needed
$          (8,892)  Reduction aligns budget
with actuals
Administration   Fiscal
Accountability
Econ Dev Strategy
Outreach   $        (20,000)
Reduction will result in
minimal impact as
existing staff is already
implementing these
duties.

Administrative
Services
Fiscal
Accountability
Reduce
Unemployment
Insurance
$        (64,148)  New costs are reflective
of post‐COVID estimates
Innovation and
Technology
Fiscal
Accountability
Reduced Budget for
I&T   $          (2,850)
Reduced outside expert
technical support. This
reduction would reduce
efficiencies from some
technology uses where
the city has historically
been comparatively
advanced.

Innovation and
Technology
Fiscal
Accountability
Reduced Budget for
I&T   $      (743,175)
Reduced applications
utilized by City staff;
Cancelled ERP
Implementation;
Reduced outside expert
technical support. This
reduction would reduce
efficiencies from some
technology uses where
the city has historically
been comparatively
advanced.

Innovation and
Technology
Fiscal
Accountability
Reduced Budget for
I&T   $        (33,522)
Prolonged tech refresh
cycles; Significantly
reduced replacement
parts and
supplies,  Reduced
outside expert technical
support.

Law Enforcement  Fiscal
Accountability
Align law enforcement
budget with actuals   $   (1,000,000)  Reduction aligns budget with actuals.

Parks and Recreation  Fiscal
Accountability
Consolidate Swim
Lessons Program   $        (72,971)
Consolidate Swim
Lessons into BBF
Operations, reducing
overall part‐time costs
and program supplies.

Parks and Recreation  Fiscal
Accountability
Consolidate Swim
Lessons Program   $        (14,147)
Consolidate Swim
Lessons into BBF
Operations, reducing
overall part‐time costs
and program supplies.

8 Department  Grouping  Service‐Level
Reduction   Fiscal Impact   Service‐Level Impact
Narrative
Department  Grouping  Service‐Level
Reduction   Fiscal Impact   Department  Grouping
Public Works  Fiscal
Accountability   Utility True‐up   $      (564,278)  Reduction aligns with budget actuals
TOTAL FISCAL ACCOUNTABILITY  $   (2,750,544)

Non‐Departmental  Infrastructure   Transfers Out   $   (2,000,000) City will initiate and
complete CIP projects
with the current Capital
Reserve fund. Th A
reduction in capital
renewal will lead to a
longterm aging of
infrastructure impacting
the attractiveness of this
infrastructure to the
public.

Public Works  Infrastructure   Contract Services   $      (810,764) Tree maintenance moved
in‐house/Reduction in
tree maintenance
Public Works  Infrastructure
Defer vehicle and
equipment
replacements,
increasing the
replacement cycle from
approximately 7 years
to 10 years on average.
$      (137,000)
May increase cost and
staff time to repair assets
that were deferred for
replacement.

TOTAL INFRASTRUCTURE  $   (2,947,764)

Department  Grouping  Service‐Level
Reduction   Fiscal Impact   Service‐Level Impact
Narrative
Administration   Operations and
Maintenance
‐ Management Analyst
reclassification to
Administrative
Assistant
‐ Removal of vacant
shared Senior Office
Assistant between
CMO and City Clerk
‐ Removal of PT Intern
$        (61,755)
Staffing for the
department has been
reorganized for efficiency
and to streamline
workload.

Administration   Operations and
Maintenance
Reduced a limited term
Project Executive
position
$      (404,221)
Use of cost recoverable
contract services will be
used instead
Administration   Operations and
Maintenance
Minimum Wage
Enforcement and
Mailers
$        (23,202)
Reduction will result in
minimal impact on staff
time to administer
enforcement of min wage
annual increases.

Removing printed
mailers will require
businesses to print it out
and post in their place of
business.

9 Department  Grouping  Service‐Level
Reduction   Fiscal Impact   Service‐Level Impact
Narrative

Administration   Operations and
Maintenance
Regulate Diversified
Retail   $          (5,000)
Reduction will result in
minimal impact as
existing staff is already
implementing these
duties.

Administration   Operations and
Maintenance
This reduction will
remove funding for a
PT Intern and
Overtime
Compensation. This
reduction also includes
the reclassification of a
Public Information
Officer to a
Communications
Coordinator.
$        (78,249)
Staffing for the
department has been
reorganized for efficiency
and to streamline
workload.

Administration   Operations and
Maintenance
Reduce cost of the
quarterly Scene
Newsletter by moving
to a digital‐only
publication.
$        (53,600)
Residents will no longer
receive the Scene in the
mail and will have to find
the Scene on a City
webpage instead.

Administrative
Services
Operations and
Maintenance
Reduce Budget for
Internal Audit   $        (40,000)
Reduction in the number
of internal audit projects.

Audits would occur on a
less frequent basis.

Administrative
Services
Operations and
Maintenance
Shift credit card fees to
customers   $        (39,000)
Customers would pay a
credit card transaction fee
for any payments made
using a credit card.

Currently, the City does
not charge credit card
fees to customers. Many
jurisdictions charge
customers a credit card
transaction fee for any
payments made using a
credit card.

City Council and
Commissions
Operations and
Maintenance
Reduce Commission
Expenses   $             (468)  Reduction aligns with
budget actuals.

City Council and
Commissions
Operations and
Maintenance
Reduce Commission
Expenses   $          (1,855)  Reduced budget for Teen
Commission.

Community
Development
Operations and
Maintenance
Shift Credit Card Fees
to Customer   $        (57,500)
Decrease bank charge
contract services.

Customers would pay a
credit card transaction fee
for any payments made
using a credit card.

Currently, the City does
not charge credit card
fees to customers. Many
jurisdictions charge
customers a credit card
transaction fee for any
payments made using a
credit card.
10 Department  Grouping  Service‐Level
Reduction   Fiscal Impact   Service‐Level Impact
Narrative
Community
Development
Operations and
Maintenance
Reduce Conferences
and Training   $        (10,691)
Reduced conference
attendance, trainings, and
meeting expenses. Thus,
resulting in reduced
service level and
response time. Reduction
could potentially lead to
higher staff turnover
rates. The department is
continuing to offer
training by exploring and
taking advantage of local
and virtual opportunities.

Parks and Recreation  Operations and
Maintenance
Reduce Senior Center
Part‐Time Staffing and
Supplies
$        (16,124)
Estimated longer wait
times for the front desk,
reduce rental support
and amenities offered for
Senior programs and
events.

Parks and Recreation  Operations and
Maintenance
Shift Credit Card Fees
to Customers   $      (159,620)
Customers would pay
credit card transaction
fees.

Parks and Recreation  Operations and
Maintenance
Reduce Parks and
Recreation Expenses   $        (10,332)  Removed budget for overtime.

Parks and Recreation  Operations and
Maintenance
Reduce Funding for
Library Extra Hours   $      (160,000)
No immediate impact on
current operational
hours. Santa Clara
County Library District
has historically received
funds from the state to
cover these costs.

Parks and Recreation  Operations and
Maintenance
Reduce Park Ranger
Services   $        (31,155)
Reduced ranger presence
at the Stevens Creek
Corridor, Environmental
Education Center, and
some nature‐based
programs and events.

Parks and Recreation  Operations and
Maintenance
Reduce Parks and
Recreation Expenses   $          (5,473)
Elimination of Helping
Hands program,
removed budget for
overtime, and realign
with budget actuals.

Parks and Recreation  Operations and
Maintenance
Shift credit card fees to
customers.   $        (17,049)
Customers would pay
credit card transaction
fees.

Parks and Recreation  Operations and
Maintenance
Reduce Senior Center
Part‐Time Staffing and
Supplies
$          (5,311)
Estimated longer wait
times for the front desk,
reduced rental support
and amenities offered for
Senior programs and
events.

Parks and Recreation  Operations and
Maintenance
Reduce Parks and
Recreation Expenses   $        (12,391)
Consolidated Preschool
Program with a focus on
the 3‐year‐old program
and removed budgets for
overtime.

11 Department  Grouping  Service‐Level
Reduction   Fiscal Impact   Service‐Level Impact
Narrative
Public Works  Operations and
Maintenance  Materials   $      (145,794)
Reduction in printing,
ergonomics,
memberships, office
supplies, conference and
meetings, etc.

Public Works  Operations and
Maintenance  Contract Services   $      (659,534)
Reduction in contract
services for fence repairs,
graffiti mitigation, bee
removal, gas emission
inventory, paid
advertising, etc.

Public Works  Operations and
Maintenance  Salary and Benefits   $      (386,406)  Reduction in part‐time staff
Public Works  Operations and
Maintenance  Special Project   $        (55,000)  Reduction of replaced fluted street light poles
Public Works  Operations and
Maintenance  Staffing   $      (463,716)
Eliminate two vacant
Public Works Project
Managers
TOTAL OPERATIONS AND MAINTENANCE  $   (2,903,446)

Q5:  Why  did  we  choose  to  pay  $10  million  in  the  CalPERS  Additional  Discretionary Payment (ADP) and not $5 or 15 million? (Council member Chao) Staff Response: Staff recommends the $10 million ADP amount as a balanced approach to address multiple priorities. This amount was chosen because it effectively reduces future required Unfunded Accrued  Liability  (UAL)  annual  payments  while  also  preserving  funds  for  other  critical  needs.

Specifically,  it  allowed  the  City  to  allocate  resources  to  the  capital  reserve  fund,  which  has  not received the typical $8–$10 million annual transfer in the past three years.

This  recommendation  reflects  the  City’s  commitment  to  managing  its  long‐term  liabilities responsibly while maintaining financial flexibility to address deferred capital needs.

Q6:  What  restrictions  does  the  City  have  on  its  investments  that  limits  our  investment returns? (Janet/Toni).  (Council member Moore)
Staff Response: Per the City’s Investment Policy, page 11, that was adopted on May 14, 2024, see information below.

12 16. Ineligible  investments  are  those  that  are  not  described  herein,  including  but  not  limited  to, common stocks and long‐term (over five years in maturity) notes and bonds are prohibited from use in this portfolio. It is noted that special circumstances arise that necessitate the purchase of securities beyond the five‐year limitation. On such occasions, requests must be approved by City Council prior to purchase. Additionally:

 State  law  notwithstanding,  any  investments  not  specifically  described  herein  are prohibited, including, but not limited to futures and options.  In accordance with Government Code, Section 53601.6, investment in inverse floaters, range notes, or mortgage derived interest‐only strips is prohibited.  Investment  in  any  security  that  could  result  in  a  zero‐interest  accrual  if  held  to maturity is prohibited. Under a provision sunsetting on January 1, 2026, securities backed by the U.S. Government that could result zero‐ or negative‐interest accrual if held to maturity are permitted.
 Trading securities for the sole purpose of speculating on the future direction of interest rates is prohibited.
 Purchasing or selling securities on margin is prohibited.  The  use  of  reverse  repurchase  agreements,  securities  lending  or  any  other  form  of borrowing or leverage is prohibited.
 The purchase of foreign currency denominated securities is prohibited.

Q7: Please provide a list of services cut last year for consideration for restoration. (Council member Chao)
Staff Response: The 4th of July Fireworks and Shakespeare in the Park events were defunded last year. However, Shakespeare in the Park continued in the current fiscal year through the use of the Mayorʹs discretionary fund.

Q8:  Please  provide  a  projection  of  interest  earnings  for  $10M  in  1‐year,  5‐year,  10‐year investment, since the public has suggested to save some as Rainy‐day fund or endowment fund. (Council member Chao)
Staff  Response:  Assuming  a  10‐year  average  annual  return  of  1.4%  from  the  Local  Agency Investment Fund (LAIF), interest earnings on $10 million over 1 year, 5 years, and 10 years would be approximately $0.14 million, $0.7 million, and $1.4 million, respectively, assuming the earnings are not reinvested.

It is also important to note that the City currently maintains a “Rainy Day Fund,” officially called the Economic Uncertainty Fund, which has a balance of approximately $24 million.

Q9: Please provide a list of grants that the staff plans to pursue with the 3‐year limited term grant management position (Council member Chao)
Staff  Response:  In  addition  to  identifying  projects  eligible  for  grant  funding,  the  Grants Management Analyst will manage all aspects of grant application submittal, reporting, and ongoing compliance within City policy. No specific grants have been identified for the position to apply for, 13 but City staff identify grant opportunities as part of normal city operations.

Q10: Why do we have a Q1 budget amendment for the proposed agenda items. Why not include them with the normal FY 2025‐26 budget? (Council member Chao) Staff  Response:  The  Q1  budget  amendments  are  for FY  2024‐25,  reflecting  items  that  were  not
originally anticipated or inadvertently excluded, therefore not included as part of the FY 2024‐25 Budget.   These  are  requests  that  would  have  been  made  regardless  of  the  CDTFA  settlement agreement.

Q11: It was mentioned it is not worthwhile to put the fund in investment of the city fund.

Please  clarify  what  limitations  are  there?  (please  quote  any  government  code  etc)  What would be the anticipated returns for such Investment? (Council member Chao) Staff Response: To clarify, the statement was not that investing City funds is not worthwhile but that  it  is  not  a  sustainable  strategy  to  invest  funds  solely  to  generate  yield,  as  discussed  in  Q2.

Instead, funds may often be more effectively utilized by investing in capital projects or making an Additional Discretionary Payment (ADP) to reduce long‐term liabilities.

The City’s investments must adhere to its adopted investment policy, which is guided by California Government  Code Section 53600 et seq. The Government Code  prioritizes safety, liquidity, and yield (in that order) and restricts the types of allowable investments, often resulting in conservative returns.

Attachments Provided with Original Staff Report:

A – One‐time Funds Allocation Plan Fiscal Year 2024‐25
B ‐ Committed, Unassigned Fund Balance, and Use of One Time Funds Policy Options A and B (Redline)
C ‐ Option A Committed, Unassigned Fund Balance, and Use of One Time Funds Policy (Clean)
D – Option B Committed, Unassigned Fund Balance, and Use of One Time Funds Policy (Clean)
E – Detailed allocation plan for current use
F – Budget Resolution
G – Assistant Director of Administrative Services Position Description H – Grants Management Analyst Position Description
I – Code Enforcement Supervisor Position Description
J – Senior Business Systems Analyst Position Description

← All documents from this meeting