Cities Index.
CC 02-04-2025 Searchable Packet.pdf

Cupertino City Council
February 4, 2025

Document
CC 02-04-2025 Searchable Packet.pdf
Meeting
February 4, 2025
Body
Cupertino City Council
Pages
237
Original file
164.2 MB
Text extracted from the city's file for reading and search. Open the original on cupertino.legistar.com. That file is the official record.

Area 1......................$ 52.65 31.26
Area 2......................$ 46.77 31.26
Area 3......................$ 47.27 31.26
Area 4......................$ 45.92 31.26
Drywall Stocker/Scrapper
Area 1......................$ 26.33 18.22
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 5/72 811 CC 02-04-2025
811 of 985
Area 2......................$ 23.39 18.22
Area 3......................$ 23.64 18.22
Area 4......................$ 22.97 18.22
---------------------------------------------------------------- CARP0152-001 07/01/2020
Contra Costa County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 52.65 30.82
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 52.80 30.82
Journeyman Carpenter........$ 52.65 30.82
Millwright..................$ 52.75 32.41
---------------------------------------------------------------- CARP0152-002 07/01/2020
San Joaquin County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 52.65 30.82
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 46.92 30.82
Journeyman Carpenter........$ 46.77 30.82
Millwright..................$ 49.27 32.41
---------------------------------------------------------------- CARP0152-004 07/01/2020
Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 52.65 30.82
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 45.57 30.82
Journeyman Carpenter........$ 45.42 30.82
Millwright..................$ 47.92 32.41
---------------------------------------------------------------- CARP0217-001 07/01/2023
San Mateo County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 60.39 33.52
Hardwood Floorlayer,
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 6/72 812 CC 02-04-2025
812 of 985
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 60.54 33.52
Journeyman Carpenter........$ 60.39 33.52
Millwright..................$ 60.49 35.11
---------------------------------------------------------------- CARP0405-001 07/01/2021
Santa Clara County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 55.00 31.49
Journeyman Carpenter........$ 54.85 31.49
Millwright..................$ 54.95 33.08
---------------------------------------------------------------- CARP0405-002 07/01/2021
San Benito County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 49.12 31.49
Journeyman Carpenter........$ 48.97 31.49
Millwright..................$ 51.47 33.08
---------------------------------------------------------------- CARP0505-001 07/01/2021
Santa Cruz County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 49.12 31.49
Journeyman Carpenter........$ 48.97 31.49
Millwright..................$ 51.47 33.08
---------------------------------------------------------------- CARP0605-001 07/01/2021
Monterey County
Rates Fringes
Carpenters
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 7/72 813 CC 02-04-2025
813 of 985
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 49.12 31.49
Journeyman Carpenter........$ 48.97 31.49
Millwright..................$ 51.47 33.08
---------------------------------------------------------------- CARP0701-001 07/01/2021
Fresno and Madera Counties
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 47.77 31.49
Journeyman Carpenter........$ 47.62 31.49
Millwright..................$ 50.12 33.08
---------------------------------------------------------------- CARP0713-001 07/01/2021
Alameda County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 55.00 31.49
Journeyman Carpenter........$ 54.85 31.49
Millwright..................$ 54.95 33.08
---------------------------------------------------------------- CARP1109-001 07/01/2021
Kings County
Rates Fringes
Carpenters
Bridge Builder/Highway
Carpenter...................$ 54.85 31.49
Hardwood Floorlayer,
Shingler, Power Saw
Operator, Steel Scaffold &
Steel Shoring Erector, Saw
Filer.......................$ 47.77 31.49
Journeyman Carpenter........$ 47.62 31.49
Millwright..................$ 50.12 33.08
---------------------------------------------------------------- ELEC0006-004 11/01/2023

SAN FRANCISCO COUNTY
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 8/72 814 CC 02-04-2025
814 of 985
Rates Fringes
Sound & Communications
Installer...................$ 51.68 3%+24.65
Technician..................$ 59.43 3%+24.65
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0006-007 06/01/2024

SAN FRANCISCO COUNTY
Rates Fringes
ELECTRICIAN......................$ 91.25 3%+45.315
---------------------------------------------------------------- ELEC0100-002 06/01/2024

FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
ELECTRICIAN......................$ 45.00 29.15
---------------------------------------------------------------- ELEC0100-005 12/01/2023

FRESNO, KINGS, MADERA
Rates Fringes
Communications System
Installer...................$ 42.48 27.42
Technician..................$ 48.85 27.42

SCOPE OF WORK
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance,
background-foreground music, intercom and telephone
interconnect, inventory control systems, microwave
transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 9/72 815 CC 02-04-2025
815 of 985
low voltage master clock systems.

A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music, Intercom and telephone
interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems,
Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical
entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video
entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and
Baseband and Carriers Point of Sale Systems, VSAT Data
Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems
WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems).

Chases and/or nipples (not to exceed 10 feet) may be
installed on open wiring systems. Energy management
systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the
scope). Fire alarm systems when installed in raceways
(including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two (2) conditions apply:

1. The project involves new or major remodel building trades construction.

2. The conductors for the fire alarm system are installed in conduit.
---------------------------------------------------------------- ELEC0234-001 12/25/2023

MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes

ELECTRICIAN
Zone A......................$ 65.16 29.55
Zone B......................$ 71.68 29.75
Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line
Zone B: Any area outside of Zone A
---------------------------------------------------------------- ELEC0234-003 12/01/2021
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 10/72 816 CC 02-04-2025
816 of 985

MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES
Rates Fringes
Sound & Communications
Installer...................$ 47.93 24.09
Technician..................$ 55.12 24.30
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0302-001 02/27/2023

CONTRA COSTA COUNTY
Rates Fringes
CABLE SPLICER....................$ 68.92 32.67
ELECTRICIAN......................$ 61.26 32.44
---------------------------------------------------------------- ELEC0302-003 12/01/2023

CONTRA COSTA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 48.44 27.60
Technician..................$ 55.71 27.82
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 11/72 817 CC 02-04-2025
817 of 985
FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0332-001 06/01/2024

SANTA CLARA COUNTY
Rates Fringes
CABLE SPLICER....................$ 100.25 46.72
ELECTRICIAN......................$ 87.17 46.33
FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.

Work on structures of 60 ft. or over (as described above):
to be paid twice the straight-time rate of pay.
---------------------------------------------------------------- ELEC0332-003 12/01/2023

SANTA CLARA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 53.18 27.745
Technician..................$ 61.16 27.985
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0595-001 06/01/2024

ALAMEDA COUNTY
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 12/72 818 CC 02-04-2025
818 of 985
Rates Fringes
CABLE SPLICER....................$ 84.18 3%+44.68
ELECTRICIAN......................$ 73.20 3%+44.68
---------------------------------------------------------------- ELEC0595-002 06/01/2024

CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
CABLE SPLICER....................$ 59.34 3%+30.48

ELECTRICIAN
(1) Tunnel work.............$ 51.92 3%+30.48
(2) All other work.........$ 49.45 3%+30.48
---------------------------------------------------------------- ELEC0595-006 11/01/2023

ALAMEDA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 51.18 3%+24.15
Technician..................$ 58.86 3%+24.15
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0595-008 11/01/2023

CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
Communications System
Installer...................$ 40.88 3%+24.15
Technician..................$ 47.01 3%+24.15
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 13/72 819 CC 02-04-2025
819 of 985
in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0617-001 06/01/2024

SAN MATEO COUNTY
Rates Fringes
ELECTRICIAN......................$ 82.00 48.05
---------------------------------------------------------------- ELEC0617-003 12/01/2023

SAN MATEO COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 53.18 27.75
Technician..................$ 61.16 27.98
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC0684-001 06/01/2024

MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 47.50 29.36
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 14/72 820 CC 02-04-2025
820 of 985
CABLE SPLICER = 110% of Journeyman Electrician
---------------------------------------------------------------- ELEC0684-004 12/01/2023

MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes
Communications System
Installer...................$ 42.48 27.42
Technician..................$ 48.85 27.62
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control
function or power supply; inclusion or exclusion of
terminations and testings of conductors determined by
their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or
jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);
excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways
(including wire and cable pulling), on projects which
involve new or major remodel building construction, for which the conductors for the fire alarm system are
installed in the conduit, shall be performed by the inside electrician.
---------------------------------------------------------------- ELEC1245-001 06/01/2024
Rates Fringes

LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 70.16 24.46
(2) Equipment specialist
(operates crawler
tractors, commercial motor
vehicles, backhoes,
trenchers, cranes (50 tons
and below), overhead &
underground distribution
line equipment).............$ 53.30 22.01
(3) Groundman...............$ 40.76 21.51
(4) Powderman...............$ 51.87 18.79
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day,
Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
---------------------------------------------------------------- ELEV0008-001 01/01/2024
Rates Fringes
ELEVATOR MECHANIC................$ 80.76 37.885+a+b
FOOTNOTE:
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 15/72 821 CC 02-04-2025
821 of 985
a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
---------------------------------------------------------------- ENGI0003-001 06/28/2023
""AREA 1"" WAGE RATES ARE LISTED BELOW
""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES.

SEE AREA DEFINITIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(AREA 1:)
GROUP 1.....................$ 60.72 31.03
GROUP 2.....................$ 59.19 31.03
GROUP 3.....................$ 57.71 31.03
GROUP 4.....................$ 56.33 31.03
GROUP 5.....................$ 55.06 31.03
GROUP 6.....................$ 53.74 31.03
GROUP 7.....................$ 52.60 31.03
GROUP 8.....................$ 51.46 31.03
GROUP 8-A...................$ 49.25 31.03
OPERATOR: Power Equipment
(Cranes and Attachments -
AREA 1:)
GROUP 1
Cranes.....................$ 52.30 31.15
Oiler......................$ 43.79 31.15
Truck crane oiler..........$ 46.08 31.15
GROUP 2
Cranes.....................$ 50.54 31.15
Oiler......................$ 42.83 31.15
Truck crane oiler..........$ 45.07 31.15
GROUP 3
Cranes.....................$ 48.80 31.15
Hydraulic..................$ 44.44 31.15
Oiler......................$ 42.55 31.15
Truck crane oiler..........$ 44.83 31.15
GROUP 4
Cranes.....................$ 45.76 31.15
OPERATOR: Power Equipment
(Piledriving - AREA 1:)
GROUP 1
Lifting devices............$ 52.64 31.15
Oiler......................$ 43.38 31.15
Truck Crane Oiler..........$ 45.66 31.15
GROUP 2
Lifting devices............$ 50.82 31.15
Oiler......................$ 43.11 31.15
Truck Crane Oiler..........$ 45.41 31.15
GROUP 3
Lifting devices............$ 49.14 31.15
Oiler......................$ 42.89 31.15
Truck Crane Oiler..........$ 45.12 31.15
GROUP 4
Lifting devices............$ 47.37 31.15
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 16/72 822 CC 02-04-2025
822 of 985
GROUP 5
Lifting devices............$ 44.73 31.15
GROUP 6
Lifting devices............$ 42.50 31.15
OPERATOR: Power Equipment
(Steel Erection - AREA 1:)
GROUP 1
Cranes.....................$ 53.27 31.15
Oiler......................$ 43.72 31.15
Truck Crane Oiler..........$ 45.95 31.15
GROUP 2
Cranes.....................$ 51.50 31.15
Oiler......................$ 43.45 31.15
Truck Crane Oiler..........$ 45.73 31.15
GROUP 3
Cranes.....................$ 50.02 31.15
Hydraulic..................$ 45.07 31.15
Oiler......................$ 43.23 31.15
Truck Crane Oiler..........$ 45.46 31.15
GROUP 4
Cranes.....................$ 48.00 31.15
GROUP 5
Cranes.....................$ 46.70 31.15
OPERATOR: Power Equipment
(Tunnel and Underground Work
- AREA 1:)
SHAFTS, STOPES, RAISES:

GROUP 1....................$ 56.82 31.03
GROUP 1-A..................$ 59.29 31.03
GROUP 2....................$ 55.56 31.03
GROUP 3....................$ 54.23 31.03
GROUP 4....................$ 53.09 31.03
GROUP 5....................$ 51.95 31.03
UNDERGROUND:

GROUP 1....................$ 56.72 31.03
GROUP 1-A..................$ 59.19 31.03
GROUP 2....................$ 55.46 31.03
GROUP 3....................$ 54.13 31.03
GROUP 4....................$ 52.99 31.03
GROUP 5....................$ 51.85 31.03
FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds.

GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat
operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds.
m.r.c.

GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane
mounted continuous flight tie back machine, tonnage to
apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 17/72 823 CC 02-04-2025
823 of 985
shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track
loader 4 cu. yds. and over; Wheel excavator (up to and
including 750 cu. yds. per hour)
GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade
checker (GPS, mechanical or otherwise); Grooving and
grinding machine; Heading shield operator; Heavy-duty
drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader;
Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller
Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil
stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.;
Tractor-drawn scraper; Tractor, compressor drill
combination; Welder; Woods-Mixer (and other similar Pugmill equipment)
GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor,
building site; Concrete pump or pumpcrete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete)
(Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine,
concrete or asphalt); Mine or shaft hoist; Portable
crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled
compactor with dozer; Tractor with boom D6 or smaller;
Trenching machine, maximum digging capacity over 5 ft.
depth; Vermeer T-600B rock cutter or similar
GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine,
truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600,
Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator;
Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with
attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines
only); Pipe wrapping machine (tractor propelled and
supported); Screed (except asphaltic concrete paving);
Self- propelled pipeline wrapping machine; Tractor;
Self-loading chipper; Concrete barrier moving machine
GROUP 7: Ballast regulator; Boom truck or dual-purpose
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 18/72 824 CC 02-04-2025
824 of 985
A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab
machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip
Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals);
Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader GROUP 8: Bit sharpener; Boiler tender; Box operator;
Brakeperson; Combination mixer and compressor
(shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator;
Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump
operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site);
Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum
sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum
cooling plant; Welding machine (powered other than by
electricity)
GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper
----------------------------------------------------------

ALL CRANES AND ATTACHMENTS
GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge
pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons
GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and
including 100 tons; Derrick barge, 100 tons and under;
Self-propelled boom-type lifting device, over 45 tons;
Tower crane
GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under;
GROUP 4: Boom Truck or dual purpose A-frame truck,
non-rotating over 15 tons; Truck-mounted rotating
telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons; Truck-mounted rotating
telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons;
----------------------------------------------------------- 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 19/72 825 CC 02-04-2025
825 of 985

PILEDRIVERS
GROUP 1: Derrick barge pedestal mounted over 100 tons;
Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons
GROUP 2: Derrick barge pedestal mounted 45 tons to and
including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under;
Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under
GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and over; Heavy-duty repairperson/welder GROUP 5: Deck engineer
GROUP 6: Deckhand; Fire tender
-------------------------------------------------------------

STEEL ERECTORS
GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons
GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane
GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under
GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder
GROUP 5: Boom cat
-------------------------------------------------------------- --

TUNNEL AND UNDERGROUND WORK
GROUP 1-A: Tunnel bore machine operator, 20' diameter or more

GROUP 1: Heading shield operator; Heavy-duty repairperson; Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator
GROUP 2: Combination slusher and motor operator; Concrete pump or pumpcrete gun; Power jumbo operator
GROUP 3: Drill doctor; Mine or shaft hoist
GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman
GROUP 5: Bit Sharpener; Brakeman; Combination mixer and 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 20/72 826 CC 02-04-2025
826 of 985
compressor (gunite); Compressor operator; Oiler; Pump
operator; Slusher operator
----------------------------------------------------------- AREA DESCRIPTIONS:

POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors]
AREA 1: ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS,

MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN

FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ,

STANISLAUS, TUOLUMNE
AREA 2 -NOTED BELOW
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:

CALAVERAS COUNTY:

Area 1: Remainder
Area 2: Eastern Part
FRESNO COUNTY:

Area 1: Remainder
Area 2: Eastern Part
MADERA COUNTY:

Area 1: Remainder
Area 2: Eastern Part
MARIPOSA COUNTY:

Area 1: Remainder
Area 2: Eastern Part
MONTEREY COUNTY:

Area 1: Remainder
Area 2: Southwestern part
TUOLUMNE COUNTY:

Area 1: Remainder
Area 2: Eastern Part
---------------------------------------------------------------- ENGI0003-008 08/01/2024
Rates Fringes
Dredging: (DREDGING:

CLAMSHELL & DIPPER DREDGING;
HYDRAULIC SUCTION DREDGING:)
AREA 1:
(1) Leverman...............$ 60.61 39.55
(2) Dredge Dozer; Heavy
duty repairman.............$ 55.65 39.55
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 54.53 39.55
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 51.23 39.55
AREA 2:
(1) Leverman...............$ 62.61 39.55
(2) Dredge Dozer; Heavy
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 21/72 827 CC 02-04-2025
827 of 985
duty repairman.............$ 57.65 39.55
(3) Booster Pump
Operator; Deck
Engineer; Deck mate;
Dredge Tender; Winch
Operator...................$ 56.53 39.55
(4) Bargeman; Deckhand;
Fireman; Leveehand; Oiler..$ 53.23 39.55

AREA DESCRIPTIONS
AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,

NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,

SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,

SUTTER, YOLO, AND YUBA COUNTIES
AREA 2: MODOC COUNTY
THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:

ALPINE COUNTY:

Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:

Area 1: Remainder
Area 2: Eastern part
COLUSA COUNTY:

Area 1: Eastern part
Area 2: Remainder
ELDORADO COUNTY:

Area 1: North Central part
Area 2: Remainder
FRESNO COUNTY:

Area 1: Remainder
Area 2: Eastern part
GLENN COUNTY:

Area 1: Eastern part
Area 2: Remainder
LASSEN COUNTY:

Area 1: Western part along the Southern portion of border with Shasta County
Area 2: Remainder
MADERA COUNTY:

Area 1: Except Eastern part
Area 2: Eastern part

MARIPOSA COUNTY
Area 1: Except Eastern part
Area 2: Eastern part

MONTERREY COUNTY
Area 1: Except Southwestern part
Area 2: Southwestern part
NEVADA COUNTY:

Area 1: All but the Northern portion along the border of Sierra County
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 22/72 828 CC 02-04-2025
828 of 985
Area 2: Remainder
PLACER COUNTY:

Area 1: Al but the Central portion
Area 2: Remainder
PLUMAS COUNTY:

Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:

Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:

Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:

Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:

Area 1: All but the Northwestern corner
Area 2: Remainder
TEHAMA COUNTY:

Area 1: All but the Western border with Mendocino & Trinity Counties
Area 2: Remainder
TRINITY COUNTY:

Area 1: East Central part and the Northeastern border with Shasta County
Area 2: Remainder
TUOLUMNE COUNTY:

Area 1: Except Eastern part
Area 2: Eastern part
---------------------------------------------------------------- ENGI0003-019 07/01/2024

SEE AREA DESCRIPTIONS BELOW
Rates Fringes
OPERATOR: Power Equipment
(LANDSCAPE WORK ONLY)
GROUP 1
AREA 1.....................$ 52.40 28.52
AREA 2.....................$ 54.40 28.52
GROUP 2
AREA 1.....................$ 48.80 28.52
AREA 2.....................$ 50.80 28.52
GROUP 3
AREA 1.....................$ 44.19 28.52
AREA 2.....................$ 46.19 28.52
GROUP DESCRIPTIONS:

GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP.
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 23/72 829 CC 02-04-2025
829 of 985
GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment
shall be included except when used for finish work as long as manufacturer's rating is 65 HP or less: A-Frame and
Winch Truck, Backhoe, Forklift, Hydragraphic Seeder
Machine, Roller, Rubber-Tired and Track Earthmoving
Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP.

GROUP 3: Landscae Utility Operator: Small Rubber-Tired
Tractor, Trencher Under 31 HP.

AREA DESCRIPTIONS:

AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED,

NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN,

SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS,

SUTTER, YOLO, AND YUBA COUNTIES
AREA 2 - MODOC COUNTY
THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW:

ALPINE COUNTY:

Area 1: Northernmost part
Area 2: Remainder
CALAVERAS COUNTY:

Area 1: Except Eastern part
Area 2: Eastern part
COLUSA COUNTY:

Area 1: Eastern part
Area 2: Remainder
DEL NORTE COUNTY:

Area 1: Extreme Southwestern corner
Area 2: Remainder
ELDORADO COUNTY:

Area 1: North Central part
Area 2: Remainder

FRESNO COUNTY
Area 1: Except Eastern part
Area 2: Eastern part
GLENN COUNTY:

Area 1: Eastern part
Area 2: Remainder
HUMBOLDT COUNTY:

Area 1: Except Eastern and Southwestern parts
Area 2: Remainder
LAKE COUNTY:

Area 1: Southern part
Area 2: Remainder
LASSEN COUNTY:

Area 1: Western part along the Southern portion of border with Shasta County
Area 2: Remainder
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 24/72 830 CC 02-04-2025
830 of 985

MADERA COUNTY
Area 1: Remainder
Area 2: Eastern part

MARIPOSA COUNTY
Area 1: Remainder
Area 2: Eastern part
MENDOCINO COUNTY:

Area 1: Central and Southeastern parts
Area 2: Remainder

MONTEREY COUNTY
Area 1: Remainder
Area 2: Southwestern part
NEVADA COUNTY:

Area 1: All but the Northern portion along the border of Sierra County
Area 2: Remainder
PLACER COUNTY:

Area 1: All but the Central portion
Area 2: Remainder
PLUMAS COUNTY:

Area 1: Western portion
Area 2: Remainder
SHASTA COUNTY:

Area 1: All but the Northeastern corner
Area 2: Remainder
SIERRA COUNTY:

Area 1: Western part
Area 2: Remainder
SISKIYOU COUNTY:

Area 1: Central part
Area 2: Remainder
SONOMA COUNTY:

Area 1: All but the Northwestern corner
Area 2: Reaminder
TEHAMA COUNTY:

Area 1: All but the Western border with mendocino & Trinity Counties
Area 2: Remainder
TRINITY COUNTY:

Area 1: East Central part and the Northeaster border with Shasta County
Area 2: Remainder
TULARE COUNTY;
Area 1: Remainder
Area 2: Eastern part
TUOLUMNE COUNTY:

Area 1: Remainder
Area 2: Eastern Part
---------------------------------------------------------------- 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 25/72 831 CC 02-04-2025
831 of 985
IRON0377-001 01/01/2024

ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES
Rates Fringes
Ironworkers:

Fence Erector...............$ 42.53 26.26
Ornamental, Reinforcing
and Structural..............$ 52.08 34.90
PREMIUM PAY:
$6.00 additional per hour at the following locations:

China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:

Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:

Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- IRON0377-003 01/01/2024
SAN FRANCISCO CITY and COUNTY
Rates Fringes
Ironworkers:

Fence Erector...............$ 42.53 26.26
Ornamental, Reinforcing
and Structural..............$ 52.58 34.90
PREMIUM PAY:
$6.00 additional per hour at the following locations:

China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:

Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:

Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 26/72 832 CC 02-04-2025
832 of 985
---------------------------------------------------------------- IRON0433-005 01/01/2024

REMAINING COUNTIES
Rates Fringes

IRONWORKER
Fence Erector...............$ 42.53 26.26
Ornamental, Reinforcing
and Structural..............$ 47.45 34.90
PREMIUM PAY:
$6.00 additional per hour at the following locations:

China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland,
Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations:

Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center
$2.00 additional per hour at the following locations:

Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LABO0067-006 07/01/2024
AREA ""1"" - ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND

SANTA CLARA COUNTIES
AREA ""2"" - CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA,

MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND

TUOLUMNE COUNTIES
Rates Fringes

LABORER (ASBESTOS/MOLD/LEAD

LABORER)
Area 1......................$ 37.75 29.69
Area 2......................$ 36.75 29.69
ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of
asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations.
---------------------------------------------------------------- LABO0073-002 07/01/2023
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 27/72 833 CC 02-04-2025
833 of 985

CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes

LABORER (TRAFFIC CONTROL/LANE

CLOSURE)
Escort Driver, Flag Person..$ 36.26 27.30
Traffic Control Person I....$ 36.56 27.30
Traffic Control Person II...$ 34.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.

TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0073-003 07/01/2023

SAN JOAQUIN COUNTY
Rates Fringes

LABORER
Mason Tender-Brick..........$ 36.29 25.55
---------------------------------------------------------------- LABO0073-005 06/26/2023
Rates Fringes
Tunnel and Shaft Laborers:

GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72

TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 28/72 834 CC 02-04-2025
834 of 985
---------------------------------------------------------------- LABO0073-007 06/26/2023

CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes

LABORER (CONSTRUCTION CRAFT

LABORERS)
Construction Specialist
Group.......................$ 36.20 27.30
GROUP 1.....................$ 35.50 27.30
GROUP 1-a...................$ 35.72 27.30
GROUP 1-c...................$ 35.55 27.30
GROUP 1-e...................$ 36.05 27.30
GROUP 1-f...................$ 30.37 23.20
GROUP 2.....................$ 35.35 27.30
GROUP 3.....................$ 35.25 27.30
GROUP 4.....................$ 28.94 27.30
See groups 1-b and 1-d under laborer classifications.

LABORER (GARDENERS,

HORTICULTURAL & LANDSCAPE

LABORERS)
(1) New Construction........$ 35.25 27.30
(2) Establishment Warranty
Period......................$ 28.94 27.30

LABORER (GUNITE)
GROUP 1.....................$ 36.46 27.30
GROUP 2.....................$ 35.96 27.30
GROUP 3.....................$ 35.37 27.30
GROUP 4.....................$ 35.25 27.30

LABORER (WRECKING)
GROUP 1.....................$ 35.50 27.30
GROUP 2.....................$ 35.35 27.30
FOOTNOTES:

Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------

LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 29/72 835 CC 02-04-2025
835 of 985
over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.

GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.

GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.

GROUP 1-f: Wire winding machine in connection with guniting 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 30/72 836 CC 02-04-2025
836 of 985
or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:

A: at demolition site for the salvage of the material.

B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.

C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.

The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------

GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------

WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0073-009 07/01/2023
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 31/72 837 CC 02-04-2025
837 of 985

CALAVERAS AND SAN JOAQUIN COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0261-003 07/01/2023

SAN FRANCISCO AND SAN MATEO COUNTIES
Rates Fringes

LABORER (TRAFFIC CONTROL/LANE

CLOSURE)
Escort Driver, Flag Person..$ 37.26 27.30
Traffic Control Person I....$ 37.56 27.30
Traffic Control Person II...$ 35.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.

TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0261-005 06/26/2023

SAN FRANCISCO AND SAN MATEO COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:

GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72

TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 32/72 838 CC 02-04-2025
838 of 985
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0261-009 06/26/2023

SAN FRANCISCO, AND SAN MATEO COUNTIES
Rates Fringes

LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 37.20 27.30
GROUP 1.....................$ 36.50 27.30
GROUP 1-a...................$ 36.72 27.30
GROUP 1-c...................$ 36.55 27.30
GROUP 1-e...................$ 37.05 27.30
GROUP 1-f...................$ 31.37 23.20
GROUP 2.....................$ 36.35 27.30
GROUP 3.....................$ 36.25 27.30
GROUP 4.....................$ 29.94 27.30
See groups 1-b and 1-d under laborer classifications.

LABORER (GARDENERS,

HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 36.25 27.30
(2) Establishment Warranty
Period......................$ 29.94 27.30
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 36.50 27.30
GROUP 2.....................$ 36.35 27.30
Laborers: (GUNITE - AREA A:)
GROUP 1.....................$ 37.46 27.30
GROUP 2.....................$ 36.96 27.30
GROUP 3.....................$ 36.37 27.30
GROUP 4.....................$ 36.25 27.30
FOOTNOTES:

Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------

LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 33/72 839 CC 02-04-2025
839 of 985
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.

GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.

GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 34/72 840 CC 02-04-2025
840 of 985
GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:

A: at demolition site for the salvage of the material.

B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.

C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.

The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------

GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------

WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 35/72 841 CC 02-04-2025
841 of 985
LABO0261-011 07/01/2023
SAN FRANCISCO AND SAN MATEO COUNTIES:

Rates Fringes
MASON TENDER, BRICK..............$ 37.05 27.45
FOOTNOTES: Underground work such as sewers, manholes, catch basins, sewer pipes, telephone conduits, tunnels and cut trenches: $5.00 per day additional. Work in live sewage:
$2.50 per day additional.
---------------------------------------------------------------- LABO0261-014 07/01/2023
SAN FRANCISCO AND SAN MATEO COUNTIES:

Rates Fringes
PLASTER TENDER...................$ 41.93 30.32
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0270-003 07/01/2023
AREA A: SANTA CLARA
AREA B: MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes

LABORER (TRAFFIC CONTROL/LANE

CLOSURE)
Escort Driver, Flag Person
Area A.....................$ 37.26 27.30
Area B.....................$ 36.26 27.30
Traffic Control Person I
Area A.....................$ 37.56 27.30
Area B.....................$ 36.56 27.30
Traffic Control Person II
Area A.....................$ 35.06 27.30
Area B.....................$ 34.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.

TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0270-004 06/26/2023

MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES Rates Fringes
Tunnel and Shaft Laborers:

GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 36/72 842 CC 02-04-2025
842 of 985
Shotcrete Specialist........$ 46.41 27.72

TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0270-005 07/01/2023

MONTEREY AND SAN BENITO COUNTIES
Rates Fringes

LABORER
Mason Tender-Brick..........$ 36.29 25.55
---------------------------------------------------------------- LABO0270-007 06/26/2023

MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
Rates Fringes

LABORER (CONSTRUCTION CRAFT

LABORERS - AREA B)
Construction Specialist
Group.......................$ 36.20 27.30
GROUP 1.....................$ 35.50 27.30
GROUP 1-a...................$ 35.72 27.30
GROUP 1-c...................$ 35.55 27.30
GROUP 1-e...................$ 36.05 27.30
GROUP 1-f...................$ 36.08 27.30
GROUP 2.....................$ 35.35 27.30
GROUP 3.....................$ 35.25 27.30
GROUP 4.....................$ 28.94 27.30
See groups 1-b and 1-d under laborer classifications.

LABORER (GARDENERS,

HORTICULTURAL & LANDSCAPE

LABORERS - AREA B)
(1) New Construction........$ 35.25 27.30
(2) Establishment Warranty
Period......................$ 28.94 27.30

LABORER (GUNITE - AREA B)
GROUP 1.....................$ 36.46 27.30
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 37/72 843 CC 02-04-2025
843 of 985
GROUP 2.....................$ 35.96 27.30
GROUP 3.....................$ 35.37 27.30
GROUP 4.....................$ 35.25 27.30

LABORER (WRECKING - AREA B)
GROUP 1.....................$ 35.50 27.30
GROUP 2.....................$ 35.35 27.30
FOOTNOTES:

Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------

LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 38/72 844 CC 02-04-2025
844 of 985
regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.

GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.

GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.

GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 39/72 845 CC 02-04-2025
845 of 985
cleaner"" is to be utilized under the following conditions:

A: at demolition site for the salvage of the material.

B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.

C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.

The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------

GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------

WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0270-010 06/26/2023

SANTA CLARA COUNTY
Rates Fringes

LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 37.20 27.30
GROUP 1.....................$ 36.50 27.30
GROUP 1-a...................$ 36.72 27.30
GROUP 1-c...................$ 36.55 27.30
GROUP 1-e...................$ 37.05 27.30
GROUP 1-f...................$ 37.08 27.30
GROUP 2.....................$ 36.35 27.30
GROUP 3.....................$ 36.25 27.30
GROUP 4.....................$ 29.94 27.30
See groups 1-b and 1-d under laborer classifications.

LABORER (GARDENERS,

HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 36.25 27.30
(2) Establishment Warranty
Period......................$ 29.94 27.30
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 37.46 27.30
GROUP 2.....................$ 36.96 27.30
GROUP 3.....................$ 36.37 27.30
GROUP 4.....................$ 36.25 27.30
LABORER (WRECKING - AREA A:)
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 40/72 846 CC 02-04-2025
846 of 985
GROUP 1.....................$ 36.50 27.30
GROUP 2.....................$ 36.35 27.30
FOOTNOTES:

Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------

LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 41/72 847 CC 02-04-2025
847 of 985
of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.

GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.

GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.

GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:

A: at demolition site for the salvage of the material.

B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 42/72 848 CC 02-04-2025
848 of 985
C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.

The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------

GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------

WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0270-011 07/01/2023

MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 40.68 29.68
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0294-001 07/01/2023

FRESNO, KINGS AND MADERA COUNTIES
Rates Fringes
LABORER (Brick)
Mason Tender-Brick..........$ 36.29 25.55
---------------------------------------------------------------- LABO0294-002 07/01/2023

FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes

LABORER (TRAFFIC CONTROL/LANE

CLOSURE)
Escort Driver, Flag Person..$ 36.26 27.30
Traffic Control Person I....$ 36.56 27.30
Traffic Control Person II...$ 34.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.

TRAFFIC CONTROL PERSON II: Installation and removal of
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 43/72 849 CC 02-04-2025
849 of 985
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0294-005 06/26/2023

FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:

GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72

TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0294-008 06/26/2023

FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes

LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Group.......................$ 36.20 27.30
GROUP 1.....................$ 35.50 27.30
GROUP 1-a...................$ 35.72 27.30
GROUP 1-c...................$ 35.55 27.30
GROUP 1-e...................$ 36.05 27.30
GROUP 1-f...................$ 36.08 27.30
GROUP 2.....................$ 35.35 27.30
GROUP 3.....................$ 35.25 27.30
GROUP 4.....................$ 28.94 27.30
See groups 1-b and 1-d under laborer classifications.

LABORER (GARDENERS,
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 44/72 850 CC 02-04-2025
850 of 985

HORTICULTURAL & LANDSCAPE
LABORERS - AREA B:)
(1) New Construction........$ 35.25 27.30
(2) Establishment Warranty
Period......................$ 28.94 27.30
LABORER (GUNITE - AREA B:)
GROUP 1.....................$ 36.46 27.30
GROUP 2.....................$ 35.96 27.30
GROUP 3.....................$ 35.37 27.30
GROUP 4.....................$ 35.25 27.30
LABORER (WRECKING - AREA B:)
GROUP 1.....................$ 35.50 27.30
GROUP 2.....................$ 35.35 27.30
FOOTNOTES:

Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------

LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 45/72 851 CC 02-04-2025
851 of 985
Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.

GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.

GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.

GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 46/72 852 CC 02-04-2025
852 of 985
track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:

A: at demolition site for the salvage of the material.

B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.

C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.

The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------

GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------

WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0294-010 07/01/2023

CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN

JOAQUIN, STANISLAUS & TUOLUMNE
Rates Fringes
Plasterer tender.................$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0294-011 07/01/2023

FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0304-002 07/01/2023
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 47/72 853 CC 02-04-2025
853 of 985

ALAMEDA COUNTY
Rates Fringes

LABORER (TRAFFIC CONTROL/LANE

CLOSURE)
Escort Driver, Flag Person..$ 37.26 27.30
Traffic Control Person I....$ 37.56 27.30
Traffic Control Person II...$ 35.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.

TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0304-003 06/26/2023

ALAMEDA COUNTY
Rates Fringes
Tunnel and Shaft Laborers:

GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72

TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0304-004 06/26/2023

ALAMEDA COUNTY
Rates Fringes
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 48/72 854 CC 02-04-2025
854 of 985

LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 37.20 27.30
GROUP 1.....................$ 36.50 27.30
GROUP 1-a...................$ 36.72 27.30
GROUP 1-c...................$ 36.55 27.30
GROUP 1-e...................$ 37.05 27.30
GROUP 1-f...................$ 37.08 27.30
GROUP 2.....................$ 36.35 27.30
GROUP 3.....................$ 36.25 27.30
GROUP 4.....................$ 29.94 27.30
See groups 1-b and 1-d under laborer classifications.

LABORER (GARDENERS,

HORTICULTURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 36.25 27.30
(2) Establishment Warranty
Period......................$ 29.94 27.30
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 37.46 27.30
GROUP 2.....................$ 36.96 27.30
GROUP 3.....................$ 36.37 27.30
GROUP 4.....................$ 36.25 27.30
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 36.50 27.30
GROUP 2.....................$ 36.35 27.30
FOOTNOTES:

Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------

LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 49/72 855 CC 02-04-2025
855 of 985
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.

GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.

GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.

GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 50/72 856 CC 02-04-2025
856 of 985
lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:

A: at demolition site for the salvage of the material.

B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.

C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.

The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------

GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------

WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO0304-005 07/01/2023

ALAMEDA COUNTY
Rates Fringes
Brick Tender.....................$ 37.05 27.45
FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 51/72 857 CC 02-04-2025
857 of 985
per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0304-008 07/01/2023
ALAMEDA AND CONTRA COSTA COUNTIES:

Rates Fringes
Plasterer tender.................$ 41.93 30.32
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO0324-002 07/01/2023

CONTRA COSTA COUNTY
Rates Fringes

LABORER (TRAFFIC CONTROL/LANE

CLOSURE)
Escort Driver, Flag Person..$ 37.26 27.30
Traffic Control Person I....$ 37.56 27.30
Traffic Control Person II...$ 35.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.

TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO0324-006 06/26/2023

CONTRA COSTA COUNTY
Rates Fringes
Tunnel and Shaft Laborers:

GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72

TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 52/72 858 CC 02-04-2025
858 of 985
Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO0324-012 06/26/2023

CONTRA COSTA COUNTY
Rates Fringes

LABORER (CONSTRUCTION CRAFT
LABORERS - AREA A:)
Construction Specialist
Group.......................$ 37.20 27.30
GROUP 1.....................$ 36.50 27.30
GROUP 1-a...................$ 36.72 27.30
GROUP 1-c...................$ 36.55 27.30
GROUP 1-e...................$ 37.05 27.30
GROUP 1-f...................$ 37.08 27.30
GROUP 1-g...................$ 36.70 27.30
GROUP 2.....................$ 36.35 27.30
GROUP 3.....................$ 36.25 27.30
GROUP 4.....................$ 29.94 27.30
See groups 1-b and 1-d under laborer classifications.

LABORER (GARDENERS,

HORTICULURAL & LANDSCAPE
LABORERS - AREA A:)
(1) New Construction........$ 36.25 27.30
(2) Establishment Warranty
Period......................$ 29.94 27.30
LABORER (GUNITE - AREA A:)
GROUP 1.....................$ 37.46 27.30
GROUP 2.....................$ 36.96 27.30
GROUP 3.....................$ 36.37 27.30
GROUP 4.....................$ 36.25 27.30
LABORER (WRECKING - AREA A:)
GROUP 1.....................$ 36.50 27.30
GROUP 2.....................$ 36.35 27.30
FOOTNOTES:

Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------

LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 53/72 859 CC 02-04-2025
859 of 985
pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.

GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.

GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 54/72 860 CC 02-04-2025
860 of 985
is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.

GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:

A: at demolition site for the salvage of the material.

B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.

C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.

The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------

GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 55/72 861 CC 02-04-2025
861 of 985
GROUP 4: Gunite laborer
----------------------------------------------------------

WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters
---------------------------------------------------------------- LABO0324-014 07/01/2023
CONTRA COSTA COUNTY:

Rates Fringes
Brick Tender.....................$ 37.05 27.45
FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LABO0324-018 07/01/2023
ALAMEDA AND CONTRA COSTA COUNTIES:

Rates Fringes
Plasterer tender.................$ 41.93 30.32
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO1130-002 07/01/2023

MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes

LABORER (TRAFFIC CONTROL/LANE

CLOSURE)
Escort Driver, Flag Person..$ 36.26 27.30
Traffic Control Person I....$ 36.56 27.30
Traffic Control Person II...$ 34.06 27.30
TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage.

TRAFFIC CONTROL PERSON II: Installation and removal of
temporary/permanent signs, markers, delineators and crash cushions.
---------------------------------------------------------------- LABO1130-003 06/26/2023
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 56/72 862 CC 02-04-2025
862 of 985

MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
Tunnel and Shaft Laborers:

GROUP 1.....................$ 45.89 27.72
GROUP 2.....................$ 45.66 27.72
GROUP 3.....................$ 45.41 27.72
GROUP 4.....................$ 44.96 27.72
GROUP 5.....................$ 44.42 27.72
Shotcrete Specialist........$ 46.41 27.72

TUNNEL AND SHAFT CLASSIFICATIONS
GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen
GROUP 2: Rodmen; Shaft work & raise (below actual or
excavated ground level)
GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High
pressure nozzleman; Miner - tunnel, including top and
bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house
GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method)
GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman
---------------------------------------------------------------- LABO1130-005 07/01/2023

MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES
Rates Fringes

LABORER
Mason Tender-Brick..........$ 36.29 25.55
---------------------------------------------------------------- LABO1130-007 06/26/2023

MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES
Rates Fringes

LABORER (CONSTRUCTION CRAFT
LABORERS - AREA B:)
Construction Specialist
Group.......................$ 36.20 27.30
GROUP 1.....................$ 35.50 27.30
GROUP 1-a...................$ 35.72 27.30
GROUP 1-c...................$ 35.55 27.30
GROUP 1-e...................$ 36.05 27.30
GROUP 1-f...................$ 36.08 27.30
GROUP 2.....................$ 35.35 27.30
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 57/72 863 CC 02-04-2025
863 of 985
GROUP 3.....................$ 35.25 27.30
GROUP 4.....................$ 28.94 27.30
See groups 1-b and 1-d under laborer classifications.

LABORER (GARDENERS,

HORTICULTURAL & LANDSCAPE
LABORERS - AREA B:)
(1) New Construction........$ 35.25 27.30
(2) Establishment Warranty
Period......................$ 28.94 27.30
LABORER (GUNITE - AREA B:)
GROUP 1.....................$ 36.46 27.30
GROUP 2.....................$ 35.96 27.30
GROUP 3.....................$ 35.37 27.30
GROUP 4.....................$ 35.25 27.30
LABORER (WRECKING - AREA B:)
GROUP 1.....................$ 35.50 27.30
GROUP 2.....................$ 35.35 27.30
FOOTNOTES:

Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers
entitled to receive the wage rate set forth in Group 1-a below.
---------------------------------------------------------

LABORER CLASSIFICATIONS
CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small
trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill
GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement;
Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter;
Dri-pak-it machine; Faller, logloader and bucker; Form
raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying,
dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No
joint pipe and stripping of same, including repair of
voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in
connection with pipelaying); Precast-manhole setter;
Pressure pipe tester; Post hole digger, air, gas and
electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 58/72 864 CC 02-04-2025
864 of 985
chipping scarifier; Roto and Ditch Witch; Rototiller;
Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster;
Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker
GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder
GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small
diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer
manholes shal receive $5.00 per day above Group 1 wage
rates.

GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work
performed on underground structures not specifically
covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall
apply to cut and cover work of subway construction after the temporary cover has been placed.

GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the
depth of the footing is unknown at the commencement of
excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception.

GROUP 1-f: Wire winding machine in connection with guniting or shot crete
GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic
tamper; All pneumatic, air, gas and electric tools not
listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches
GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 59/72 865 CC 02-04-2025
865 of 985
Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only)
GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material
cleaner"" is to be utilized under the following conditions:

A: at demolition site for the salvage of the material.

B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job.

C: for the cleaning of salvage material at the jobsite or temporary jobsite yard.

The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"".
--------------------------------------------------------

GUNITE LABORER CLASSIFICATIONS
GROUP 1: Structural Nozzleman
GROUP 2: Nozzleman, Gunman, Potman, Groundman
GROUP 3: Reboundman
GROUP 4: Gunite laborer
----------------------------------------------------------

WRECKING WORK LABORER CLASSIFICATIONS
GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials)
GROUP 2: Semi-skilled wrecker (salvaging of other building materials)
---------------------------------------------------------------- LABO1130-008 07/01/2023

CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN

JOAQUIN, STANISLAUS & TUOLUMNE
Rates Fringes
Plasterer tender.................$ 39.77 28.54
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LABO1130-009 07/01/2023

MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES
Rates Fringes
LABORER (Plaster Tender).........$ 39.77 28.54
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 60/72 866 CC 02-04-2025
866 of 985
Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0016-001 01/01/2024

ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN MATEO, SANTA

CLARA, AND SANTA CRUZ COUNTIES
Rates Fringes
Painters:........................$ 50.51 27.66
PREMIUMS:

EXOTIC MATERIALS - $1.25 additional per hour.

SPRAY WORK: - $0.50 additional per hour.

INDUSTRIAL PAINTING - $0.25 additional per hour
[Work on industrial buildings used for the manufacture and processing of goods for sale or service; steel construction (bridges), stacks, towers, tanks, and similar structures] HIGH WORK:
over 50 feet - $2.00 per hour additional
100 to 180 feet - $4.00 per hour additional
Over 180 feet - $6.00 per houir additional
---------------------------------------------------------------- PAIN0016-003 01/01/2024
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA

CLARA COUNTIES
AREA 2: CALAVERAS, MARIPOA, MERCED, MONTEREY, SAN BENITO, SAN

JOAQUIN, SANTA CRUZ, STANISLAUS & TUOLUMNE COUNTIES
Rates Fringes
Drywall Finisher/Taper
AREA 1......................$ 60.41 31.34
AREA 2......................$ 56.28 29.94
---------------------------------------------------------------- PAIN0016-012 01/01/2024

ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO,

SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES Rates Fringes
SOFT FLOOR LAYER.................$ 59.00 33.03
---------------------------------------------------------------- PAIN0016-015 01/01/2024

CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE

COUNTIES
Rates Fringes

PAINTER
Brush.......................$ 40.85 22.40
FOOTNOTES:

SPRAY/SANDBLAST: $0.50 additional per hour.
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 61/72 867 CC 02-04-2025
867 of 985
EXOTIC MATERIALS: $1.25 additional per hour.

HIGH TIME: Over 50 ft above ground or water level $2.00 additional per hour. 100 to 180 ft above ground or water level $4.00 additional per hour. Over 180 ft above ground or water level $6.00 additional per hour.
---------------------------------------------------------------- PAIN0016-022 01/01/2024

SAN FRANCISCO COUNTY
Rates Fringes
PAINTER..........................$ 54.13 27.66
---------------------------------------------------------------- PAIN0169-001 01/01/2023
FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES:

Rates Fringes
GLAZIER..........................$ 44.33 28.88
---------------------------------------------------------------- PAIN0169-005 01/01/2024

ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN

MATEO, SANTA CLARA & SANTA CRUZ COUNTIES
Rates Fringes
GLAZIER..........................$ 56.22 34.00
---------------------------------------------------------------- PAIN0294-004 07/01/2023

FRESNO, KINGS AND MADERA COUNTIES
Rates Fringes

PAINTER
Brush, Roller...............$ 34.49 21.80
Drywall Finisher/Taper......$ 35.74 21.80
FOOTNOTE:

Spray Painters & Paperhangers recive $1.00 additional per hour. Painters doing Drywall Patching receive $1.25
additional per hour. Lead Abaters & Sandblasters receive $1.50 additional per hour. High Time - over 30 feet (does not include work from a lift) $0.75 per hour additional. ---------------------------------------------------------------- PAIN0294-005 01/01/2023

FRESNO, KINGS & MADERA
Rates Fringes
SOFT FLOOR LAYER.................$ 38.53 23.19
---------------------------------------------------------------- PAIN0767-001 01/01/2024
CALAVERAS, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:

Rates Fringes
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 62/72 868 CC 02-04-2025
868 of 985
GLAZIER..........................$ 43.25 35.62
PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day.

Employee required to wear a body harness shall receive $1.50 per hour above the basic hourly rate at any elevation.
---------------------------------------------------------------- PAIN1176-001 07/01/2022
HIGHWAY IMPR0VEMENT
Rates Fringes
Parking Lot Striping/Highway
Marking:

GROUP 1.....................$ 40.83 17.62
GROUP 2.....................$ 34.71 17.62
GROUP 3.....................$ 35.11 17.62

CLASSIFICATIONS
GROUP 1: Striper: Layout and application of painted traffic stripes and marking; hot thermo plastic; tape, traffic
stripes and markings
GROUP 2: Gamecourt & Playground Installer
GROUP 3: Protective Coating, Pavement Sealing
---------------------------------------------------------------- PAIN1237-003 01/01/2024
CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES:

Rates Fringes
SOFT FLOOR LAYER.................$ 48.54 26.59
---------------------------------------------------------------- PLAS0066-002 07/01/2019
ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES:

Rates Fringes
PLASTERER........................$ 42.41 30.73
---------------------------------------------------------------- PLAS0300-001 07/01/2018
Rates Fringes

PLASTERER
AREA 188: Fresno...........$ 32.70 31.68
AREA 224: San Benito,
Santa Clara, Santa Cruz.....$ 32.88 31.68
AREA 295: Calaveras & San
Joaquin Couonties...........$ 32.70 31.68
AREA 337: Monterey County..$ 32.88 31.68
AREA 429: Mariposa,
Merced, Stanislaus,
Tuolumne Counties...........$ 32.70 31.68
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 63/72 869 CC 02-04-2025
869 of 985
---------------------------------------------------------------- PLAS0300-005 07/01/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 32.15 23.27
---------------------------------------------------------------- PLUM0038-001 07/01/2023

SAN FRANCISCO COUNTY
Rates Fringes
PLUMBER (Plumber,
Steamfitter, Refrigeration
Fitter)..........................$ 85.50 48.98
---------------------------------------------------------------- PLUM0038-005 07/01/2023

SAN FRANCISCO COUNTY
Rates Fringes
Landscape/Irrigation Fitter
(Underground/Utility Fitter).....$ 72.68 32.91
---------------------------------------------------------------- PLUM0062-001 07/01/2024

MONTEREY AND SANTA CRUZ COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 53.00 41.70
---------------------------------------------------------------- PLUM0159-001 07/01/2024

CONTRA COSTA COUNTY
Rates Fringes
Plumber and steamfitter
(1) Refrigeration...........$ 65.28 48.04
(2) All other work..........$ 66.17 48.04
---------------------------------------------------------------- PLUM0246-001 07/01/2024

FRESNO, KINGS & MADERA COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 50.00 40.69
---------------------------------------------------------------- * PLUM0246-004 01/01/2017

FRESNO, MERCED & SAN JOAQUIN COUNIES
Rates Fringes
PLUMBER (PIPE TRADESMAN).........$ 13.00 ** 10.74
PIPE TRADESMAN SCOPE OF WORK:

Installation of corrugated metal piping for drainage, as well as installation of corrugated metal piping for culverts in connection with storm sewers and drains; Grouting, dry
packing and diapering of joints, holes or chases including 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 64/72 870 CC 02-04-2025
870 of 985
paving over joints, in piping; Temporary piping for dirt work for building site preparation; Operating jack hammers, pavement breakers, chipping guns, concrete saws and spades to cut holes, chases and channels for piping systems;
Digging, grading, backfilling and ground preparation for all types of pipe to all points of the jobsite; Ground
preparation including ground leveling, layout and planting of shrubbery, trees and ground cover, including watering, mowing, edging, pruning and fertilizing, the breaking of concrete, digging, backfilling and tamping for the
preparation and completion of all work in connection with lawn sprinkler and landscaping; Loading, unloading and
distributing materials at jobsite; Putting away materials in storage bins in jobsite secure storage area; Demolition of piping and fixtures for remodeling and additions;
Setting up and tearing down work benches, ladders and job shacks; Clean-up and sweeping of jobsite; Pipe wrapping and waterproofing where tar or similar material is applied for protection of buried piping; Flagman
---------------------------------------------------------------- PLUM0342-001 07/01/2023

ALAMEDA & CONTRA COSTA COUNTIES
Rates Fringes

PIPEFITTER
CONTRA COSTA COUNTY.........$ 74.00 47.45

PLUMBER, PIPEFITTER,

STEAMFITTER
ALAMEDA COUNTY..............$ 74.00 47.45
---------------------------------------------------------------- PLUM0355-004 07/01/2024

ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA,

MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, AND TUOLUMNE COUNTIES:

Rates Fringes
Underground Utility Worker
/Landscape Fitter...........$ 34.51 18.30
---------------------------------------------------------------- PLUM0393-001 07/01/2021

SAN BENITO AND SANTA CLARA COUNTIES
Rates Fringes
PLUMBER/PIPEFITTER...............$ 68.76 46.63
---------------------------------------------------------------- PLUM0442-001 07/01/2024

CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE

COUNTIES
Rates Fringes
PLUMBER & STEAMFITTER............$ 54.05 36.99
---------------------------------------------------------------- PLUM0467-001 07/01/2024
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 65/72 871 CC 02-04-2025
871 of 985

SAN MATEO COUNTY
Rates Fringes
Plumber/Pipefitter/Steamfitter...$ 83.75 40.65
---------------------------------------------------------------- ROOF0027-002 01/01/2024

FRESNO, KINGS, AND MADERA COUNTIES
Rates Fringes
ROOFER...........................$ 42.51 16.11
FOOTNOTE: Work with pitch, pitch base of pitch impregnated products or any material containing coal tar pitch, on any building old or new, where both asphalt and pitchers are used in the application of a built-up roof or tear off:
$2.00 per hour additional.
---------------------------------------------------------------- ROOF0040-002 08/01/2024
SAN FRANCISCO & SAN MATEO COUNTIES:

Rates Fringes
ROOFER...........................$ 55.30 22.97
---------------------------------------------------------------- ROOF0081-001 08/01/2023
ALAMEDA AND CONTRA COSTA COUNTIES:

Rates Fringes
Roofer...........................$ 52.47 22.31
---------------------------------------------------------------- ROOF0081-004 08/01/2024

CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:

Rates Fringes
ROOFER...........................$ 49.65 22.19
---------------------------------------------------------------- ROOF0095-002 08/01/2023
MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES:

Rates Fringes
ROOFER
Bitumastic, Enameler, Coal
Tar, Pitch and Mastic
worker......................$ 57.17 21.51
Journeyman..................$ 53.17 21.51
Kettle person (2 kettles)...$ 55.17 21.51
---------------------------------------------------------------- SFCA0483-001 08/01/2024

ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES:
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 66/72 872 CC 02-04-2025
872 of 985
Rates Fringes
SPRINKLER FITTER (FIRE)..........$ 79.13 38.51
---------------------------------------------------------------- SFCA0669-011 01/01/2024

CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY,

SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES:

Rates Fringes
SPRINKLER FITTER.................$ 44.32 27.83
---------------------------------------------------------------- SHEE0104-001 07/01/2020
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA
AREA 2: MONTEREY & SAN BENITO
AREA 3: SANTA CRUZ
Rates Fringes

SHEET METAL WORKER
AREA 1:

Mechanical Contracts
under $200,000.............$ 55.92 45.29
All Other Work.............$ 64.06 46.83
AREA 2......................$ 52.90 36.44
AREA 3......................$ 55.16 34.18
---------------------------------------------------------------- SHEE0104-003 07/01/2021
CALAVERAS AND SAN JOAQUIN COUNTIES:

Rates Fringes
SHEET METAL WORKER...............$ 44.34 39.22
---------------------------------------------------------------- SHEE0104-005 07/01/2021
MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES:

Rates Fringes
SHEET METAL WORKER (Excluding
metal deck and siding)...........$ 41.28 45.41
---------------------------------------------------------------- SHEE0104-007 07/01/2021
FRESNO, KINGS, AND MADERA COUNTIES:

Rates Fringes
SHEET METAL WORKER...............$ 44.07 40.79
---------------------------------------------------------------- SHEE0104-015 07/01/2020

ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES:
11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 67/72 873 CC 02-04-2025
873 of 985
Rates Fringes
SHEET METAL WORKER (Metal
Decking and Siding only).........$ 44.45 35.55
---------------------------------------------------------------- SHEE0104-018 07/01/2020

CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES:

Rates Fringes
Sheet metal worker (Metal
decking and siding only).........$ 44.45 35.55
---------------------------------------------------------------- TEAM0094-001 07/01/2024
Rates Fringes
Truck drivers:

GROUP 1.....................$ 41.54 33.25
GROUP 2.....................$ 41.84 33.25
GROUP 3.....................$ 42.14 33.25
GROUP 4.....................$ 42.49 33.25
GROUP 5.....................$ 42.84 33.25
FOOTNOTES:

Articulated dump truck; Bulk cement spreader (with or without auger); Dumpcrete truck; Skid truck (debris box); Dry
pre-batch concrete mix trucks; Dumpster or similar type; Slurry truck: Use dump truck yardage rate.

Heater planer; Asphalt burner; Scarifier burner; Industrial lift truck (mechanical tailgate); Utility and clean-up
truck: Use appropriate rate for the power unit or the
equipment utilized.

TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Dump trucks, under 6 yds.; Single unit flat rack (2- axle unit); Nipper truck (when flat rack truck is used
appropriate flat rack shall apply); Concrete pump truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump machine; Fork lift and lift jitneys; Fuel and/or grease truck driver or fuel person; Snow buggy; Steam cleaning; Bus or personhaul driver; Escort or pilot car driver; Pickup truck; Teamster oiler/greaser and/or serviceperson; Hook tender (including loading and
unloading); Team driver; Tool room attendant (refineries) GROUP 2: Dump trucks, 6 yds. and under 8 yds.; Transit
mixers, through 10 yds.; Water trucks, under 7,000 gals.; Jetting trucks, under 7,000 gals.; Single-unit flat rack (3-axle unit); Highbed heavy duty transport; Scissor truck; Rubber-tired muck car (not self-loaded); Rubber-tired truck jumbo; Winch truck and ""A"" frame drivers; Combination winch truck with hoist; Road oil truck or bootperson;
Buggymobile; Ross, Hyster and similar straddle carriers; Small rubber-tired tractor
GROUP 3: Dump trucks, 8 yds. and including 24 yds.; Transit mixers, over 10 yds.; Water trucks, 7,000 gals. and over; 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 68/72 874 CC 02-04-2025
874 of 985
Jetting trucks, 7,000 gals. and over; Vacuum trucks under 7500 gals. Trucks towing tilt bed or flat bed pull
trailers; Lowbed heavy duty transport; Heavy duty transport tiller person; Self- propelled street sweeper with
self-contained refuse bin; Boom truck - hydro-lift or
Swedish type extension or retracting crane; P.B. or similar type self-loading truck; Tire repairperson; Combination bootperson and road oiler; Dry distribution truck (A
bootperson when employed on such equipment, shall receive the rate specified for the classification of road oil
trucks or bootperson); Ammonia nitrate distributor, driver and mixer; Snow Go and/or plow
GROUP 4: Dump trucks, over 25 yds. and under 65 yds.; Water pulls - DW 10's, 20's, 21's and other similar equipment when pulling Aqua/pak or water tank trailers; Helicopter pilots (when transporting men and materials); Lowbedk Heavy Duty Transport up to including 7 axles; DW10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTourneau Pulls, Tournorocker, Euclid and similar type equipment when
pulling fuel and/or grease tank trailers or other
miscellaneous trailers; Vacuum Trucks 7500 gals and over and truck repairman
GROUP 5: Dump trucks, 65 yds. and over; Holland hauler; Low bed Heavy Duty Transport over 7 axles
---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================ ** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage
determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at
https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 69/72 875 CC 02-04-2025
875 of 985
(29CFR 5.5 (a) (1) (iii)).
---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this
classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average
calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those
classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 70/72 876 CC 02-04-2025
876 of 985
for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

State Adopted Rate Identifiers
Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R �1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
----------------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.

Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 71/72 877 CC 02-04-2025
877 of 985

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION"

11/13/24, 4:32 PM SAM.gov
https://sam.gov/wage-determination/CA20240018/22 72/72 878 CC 02-04-2025
878 of 985
Cupertino Photovoltaic Systems Design and Installation Project APPENDIX B Project 2025-02 Page 88

APPENDIX B

EXEMPLAR INSURANCE REQUIREMENTS
DBE will procure and maintain for the duration of the Project, and for five years following the completion of the Project, insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the design-build services hereunder by DBE, its agents, representatives, employees, subconsultants, or subcontractors. (A) Minimum Scope and Limit of Insurance. Coverage will be at least as broad as the minimum limits set forth below. If DBE maintains broader coverage and/or higher limits than the minimums shown below, City will be entitled to the broader coverage and/or higher limits maintained by DBE. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage will be available to the City. City reserves the right to modify these insurance requirements based on DBE’s prior experience, insurer, coverage, and considering the nature of the risk involved in the design-build services and other circumstances. DBE should discuss these requirements with its insurer and the designated representative.
(1) Commercial General Liability (CGL). Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, written on a comprehensive general liability form, and must include coverage for liability arising from DBE’s or any contractor's or subcontractor’s acts or omissions, including DBE’s protected coverage, blanket contractual, products and completed operations, with limits of at least $8,000,000 per occurrence. The CGL policy must protect against any and all liability for personal injury, death, property damage or destruction, and personal and advertising injury. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this Project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be $16,000,000, which is twice the required occurrence limit. (i) It shall be a requirement under this Contract that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits will be made available to the Additional Insured and will be (1) the minimum coverage/limits specified in this Contract; or (2) the broader coverage and maximum limits of coverage of any insurance policy, whichever is greater. (ii) Additional Insured coverage under DBE’s policy shall be “primary and non-contributory,” will not seek contribution from City’s insurance/self-insurance, and will be at least as broad as ISO CG 20 01 04

13. (iii) The limits of insurance required may be satisfied by a combination of primary and umbrella or excess insurance, provided each policy DRAFT CONTRACT: APPENDIX B
879
CC 02-04-2025
879 of 985
Cupertino Photovoltaic Systems Design and Installation Project APPENDIX B Project 2025-02 Page 89
complies with the requirements set forth in this Contract. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of City before the City’s own insurance or selfinsurance shall be called upon to protect City as a named insured. (2) Automobile Liability. ISO Form CA 00 01 covering any auto (Code 1), or if DBE has no owned autos, then hired autos (Code 8) and non-owned autos (Code 9), with limit no less than $5,000,000 per accident for bodily injury and property damage.
(3) Workers’ Compensation. As required by the State of California, with statutory limits, and Employer’s Liability Insurance of no less than $1,000,000 per accident for bodily injury or disease, or as otherwise required by statute. If DBE is selfinsured, DBE must provide a Certificate of Permission to Self-Insure, duly authorized by the DIR.
(4) Professional Liability. Professional liability to cover all services performed by design professionals, with limits no less than $5,000,000 per occurrence or claim, and $5,000,000 aggregate.
(5) Builder’s Risk. Course of Construction insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the Project and no coinsurance penalty provisions.
(6) Pollution and/or Asbestos Legal Liability. DBEs’ Pollution Legal Liability and/or Asbestos Legal Liability and/or Errors and Omissions with limits no less than $2,000,000 per occurrence or claim, and $4,000,000 policy aggregate. ☐ N/A if box checked (Project does not involve environmental hazards). (B) Self-Insured Retentions. Self-insured retentions must be declared to and approved by City. At City’s option, either: (1) DBE will cause the insurer to reduce or eliminate selfinsured retentions as respects City, its officers, officials, employees, and volunteers; or (2) DBE will provide a financial guarantee satisfactory to City guaranteeing payment of losses and related investigations, claim administration, and defense expenses. The policy language will provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or the City.
(C) Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions:
(1) Additional Insured Status. The City of Cupertino, its City Council, officers, officials, employees, agents, servants and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of the design-build services performed by or on behalf of DBE including materials, parts, or equipment furnished. Endorsement of CGL coverage must be at least as 880
CC 02-04-2025
880 of 985
Cupertino Photovoltaic Systems Design and Installation Project APPENDIX B Project 2025-02 Page 90
broad as ISO Form CG 20 10 for ongoing operations and CG 20 37 for completed operations.
(2) Primary Coverage. For any claims related to this Project, DBE’s insurance coverage must be “primary and non-contributory” and at least as broad as ISO CG 20 01 04 13 with respect to City, its officers, officials, employees and volunteers, and must not seek contribution from City’s insurance. If the limits of insurance are satisfied in part by Umbrella/Excess Insurance, the Umbrella/Excess Insurance must contain or be endorsed to contain a provision that such coverage will also apply on a “primary and non-contributory” basis for the benefit of City.
(3) Notice of Cancellation. Each insurance policy required must provide that coverage will not be canceled, except with notice to the City. Each certificate of insurance must state that the coverage afforded by the policy is in force and will not be reduced, cancelled or allowed to expire without at least 30 days advance written notice to City, unless due to non-payment of premiums, in which case ten days advance written notice must be provided to City. Such notice must be sent to City via certified mail and addressed to the attention of the City Manager. (4) Builder’s Risk. DBE may submit Builder’s Risk insurance in the form of Course of Construction coverage, which shall name the City as a loss payee, as its interest may appear. Policy limits must be per occurrence and for all-risk coverage on a 100% completed value basis on the insurable portion of the Project, with no coinsurance penalties, and for the benefit of City. If the Project does not involve new or major reconstruction, City may elect in its sole discretion to accept an Installation Floater policy instead of Builder’s Risk. For such projects, the Property Installation Floater shall include improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment, and shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City’s site. (5) Waiver of Subrogation. Each required policy must include an endorsement providing that the carrier agrees to waive any right of subrogation it may have against City. DBE agrees to waive rights of subrogation which any insurer of DBE may acquire from DBE by virtue of the payment of any loss. DBE agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy must be endorsed with a waiver of subrogation in favor of the City for all work performed by the DBE, its employees, agents and subcontractors.
(6) Acceptability of Insurers. Insurance must be issued by insurers acceptable to City and licensed to do business in the State of California, and each insurer must have an A.M. Best’s financial strength rating of “A-” or better and a financial size rating of “VII” or better.
881
CC 02-04-2025
881 of 985
Cupertino Photovoltaic Systems Design and Installation Project APPENDIX B Project 2025-02 Page 91
(7) Verification of Coverage. DBE will furnish the City with original certificates and amendatory endorsements, or copies of the applicable insurance language, effecting coverage required by this Contract. All certificates and endorsements are to be received and approved by the City before performing the design-build services. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.
(8) Subcontractors. DBE will require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and DBE will ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors will provide coverage with a form at least as broad as CG 20 38 04 13.
(9) Claims Made Policies. If any coverage required is written on a claims-made coverage form:
(i) The retroactive date must be shown, and this date must be before the execution date of the Contract or the beginning of the design-build services.
(ii) Insurance must be maintained and evidence of insurance must be provided for at least five years after completion of the design-build services.
(iii) If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the Effective Date of the contract, or start of design-build services, the DBE must purchase extended reporting period coverage for a minimum of five years after completion of the design-build services. (iv) A copy of the claims reporting requirements must be submitted to the City for review.
(v) If the Services involve lead-based paint or asbestos identification/remediation, the DBE’s Pollution Liability policy must not contain lead-based paint or asbestos exclusions. If the Services involve mold identification/remediation, the DBE’s Pollution Liability policy must not contain a mold exclusion, and the definition of “pollution” must include microbial matter, including mold 882
CC 02-04-2025
882 of 985

A B C D E F G H I J K L M
Facility kWh kWh Cost cost per
kWh
(ave.)
PV systems
kWH
generation
PV systems
annual
savings*
PV systems
annual
electrical
bill**
PV systems
lifecycle
savings***
Constrn
Cost: PV
only
Constrn
Cost: EVCS
only
Constrn. Cost
(PV + EV)
IRA funding
(40% of PV
only)
City Funding Payback
Period
(years)
****
formula A/B B - E H + I H * 40% J - K
Library (1932850108) 1,048,978 $322,517 $0.31 621,477 $189,074 $133,443 $10,847,040 $3,803,000 $300,000 $4,103,000 $1,521,200 $2,581,800 11.33 BBF (114315284) 110,428 $32,539 $0.29 110,948 $38,253 -$5,714 $1,563,642 $956,000 $100,000 $1,056,000 $382,400 $673,600 14.08 Quinlan Community Center
(0116367009-116367840) 383,109 $121,336 $0.32 453,795 $154,217 -$32,881 $7,272,774 $2,343,000 $150,000 $2,493,000 $867,200 $1,625,800 9.21 Sports Center (0116367009-
116971849) 329,369 $108,143 $0.33 322,104 $93,047 $15,096 $4,434,018 $1,815,000 $150,000 $1,965,000 $726,000 $1,239,000 11.11 Community Hall (0116367009-
116367449) 114,600 $39,810 $0.35 66,784 $29,441 $10,369 $1,315,345 $377,000 $0 $377,000 $150,800 $226,200 7.15 $624,345 $504,032 $120,313 $25,432,819 $9,294,000 $700,000 $9,994,000 $3,647,600 $6,346,400 10.66 decreased by: 504,032 with 20% contingency $11,992,800
Four sites, WITHOUT BBF
Library (1932850108) 1,048,978 $322,517 $0.31 621,477 $189,074 $133,443 $10,847,040 $3,803,000 $300,000 $4,103,000 $1,521,200 $2,581,800 11.33 Quinlan Community Center
(0116367009-116367840) 383,109 $121,336 $0.32 453,795 $154,217 -$32,881 $7,272,774 $2,343,000 $150,000 $2,493,000 $867,200 $1,625,800 9.21 Sports Center (0116367009-
116971849) 329,369 $108,143 $0.33 322,104 $93,047 $15,096 $4,434,018 $1,815,000 $150,000 $1,965,000 $726,000 $1,239,000 11.11 Community Hall (0116367009-
116367449) 114,600 $39,810 $0.35 66,784 $29,441 $10,369 $1,315,345 $377,000 $0 $377,000 $150,800 $226,200 7.15 $591,805 $465,779 $126,026 $23,869,177 $8,338,000 $600,000 $8,938,000 $3,265,200 $5,672,800 9.98 decreased by: 465,779 with 20% contingency $10,725,600
Three sites, WITHOUT BBF and Library
Quinlan Community Center
(0116367009-116367840) 383,109 $121,336 $0.32 453,795 $154,217 -$32,881 $7,272,774 $2,343,000 $150,000 $2,493,000 $867,200 $1,625,800 9.21 Sports Center (0116367009-
116971849) 329,369 $108,143 $0.33 322,104 $93,047 $15,096 $4,434,018 $1,815,000 $150,000 $1,965,000 $726,000 $1,239,000 11.11 Community Hall (0116367009-
116367449) 114,600 $39,810 $0.35 66,784 $29,441 $10,369 $1,315,345 $377,000 $0 $377,000 $150,800 $226,200 7.15 $269,289 $276,705 -$7,416 $13,022,137 $4,535,000 $300,000 $4,835,000 $1,744,000 $3,091,000 9.46 decreased by: 276,705 with 20% contingency $5,802,000
Four sites, WITHOUT LIBRARY
BBF (114315284) 110,428 $32,539 $0.29 110,948 $38,253 -$5,714 $1,563,642 $956,000 $100,000 $1,056,000 $382,400 $673,600 14.08 Quinlan Community Center
(0116367009-116367840) 383,109 $121,336 $0.32 453,795 $154,217 -$32,881 $7,272,774 $2,343,000 $150,000 $2,493,000 $867,200 $1,625,800 9.21 Sports Center (0116367009-
116971849) 329,369 $108,143 $0.33 322,104 $93,047 $15,096 $4,434,018 $1,815,000 $150,000 $1,965,000 $726,000 $1,239,000 11.11 Community Hall (0116367009-
116367449) 114,600 $39,810 $0.35 66,784 $29,441 $10,369 $1,315,345 $377,000 $0 $377,000 $150,800 $226,200 7.15 $301,828 $314,958 -$13,130 $14,585,779 $5,491,000 $400,000 $5,891,000 $2,126,400 $3,764,600 10.28 decreased by: 314,958 with 20% contingency $7,069,200
CUPERTINO PHOTOVOLTAIC SYSTEMS DESIGN AND INSTALLATION PROJECT • APPENDIX D - PRELIMINARY COST/SAVINGS *Annual savings includes 5% utility escalation over a 1.5 year construction period, Year 1
**The costs (B) are offset by the kWh savings (E), resulting in lowered electrical bill (F)
***Lifecycle Savings (30yrs) includes: 5% utility escalation, 0.5% module degradation, 30 years, NEM3 Included
****Discounted cashflow methodology includes: 5% utility escalation,

0.5% module degradation, 30 years, NEM3 Included
11/14/2024
883
CC 02-04-2025
883 of 985

CUPERTINO PHOTOVOLTAIC SYSTEMS DESIGN AND INSTALLATION PROJECT

APPENDIX E
REFERENCE MATERIALS – Links to further information for each Facility:

Drawings and other documents for each site:
• RFP - Existing Facility docs_Reference
Cupertino Library and Community Hall (Civic Center)
• 2020 Library Expansion Project: h&ps://www.cupertino.org/our-city/departments/publicworks/capital-improvement-program-projects/library-expansion-project • 2018 Civic Center Master Plan Archive: h&ps://www.cupertino.org/our-city/departments/publicworks/capital-improvement-program-projects/civic-center-master-plan-archive • Rental Info page: h&ps://www.cupertino.org/our-city/departments/parks-recreation/reservationspermits/indoor-facilities/community-hall • SCCLD Cupertino Library page:
h&ps://sccld.org/locations/cupertino/?_gl=1*1nu2sg5*_ga*NjMyMDUzOTMxLjE3Mjk1MjU4MzU. *_ga_G99DMMNG39*MTczMTU2NDIwMS4yLjEuMTczMTU2NDIyNS4wLjAuMA..*_ga_C5XQ HLX1NN*MTczMTU2NDIwMS4yLjEuMTczMTU2NDIzMy4wLjAuMA..*_ga_C79ES1D7Q4*MTc yOTUyNTgzNC4zLjEuMTcyOTUyNjAyOC4wLjAuMA..

Cupertino Sports Center
• Recreation Info page: h&ps://www.cupertino.org/our-city/departments/parksrecreation/cupertino-sports-center Blackberry Farm:
• Recreation Info page: h&ps://www.cupertino.org/our-city/departments/parks-recreation/outdooractivities/blackberry-farm Quinlan Community Center:
• Rental Info page: h&ps://www.cupertino.org/our-city/departments/parks-recreation/reservationspermits/indoor-facilities/quinlan-community-center • Memorial Park Specific Plan: h&ps://engagecupertino.org/memorial-park-specific-plan This project:
• h&ps://www.cupertino.org/our-city/departments/public-works/capital-improvement-programprojects/photovoltaic-systems-design-and-installation-project General:
• Property Information Map (Cupertino): h&ps://map.gridics.com/us/ca/cupertino • More City Maps: h&ps://www.cupertino.org/online-services/open-government-data/city-maps • FEMA maps: h&ps://msc.fema.gov/portal/advanceSearch
884
CC 02-04-2025
884 of 985

Page 1 ends

City of Cupertino Photovoltaic Systems Design and Installation Project RFP for Design-Build Entities – Appendix F

CUPERTINO PHOTOVOLTAIC SYSTEMS DESIGN AND INSTALLATION PROJECT

APPENDIX F

PRICE PROPOSAL FORM
Directions: Complete and execute a Price Proposal Form as indicated and attach as Part B to the Proposal. The proposed Contract Price for the Services (as those terms are defined in Article 1 of the General Conditions of the Design-Build Contract Documents), must be fully inclusive of all costs, direct and indirect, including, but not limited to, labor, materials, equipment, overhead, permits, licenses, insurance, bonds, taxes, profit, etc.

A. Price Proposal: Provide the proposed Contract Price to design and build the Project with no reduction in the minimum requirements, including performance criteria, set forth in the RFP and Bridging Documents. If the Proposer has suggestions for efficiencies, value engineering organizational improvements that have cost benefits, etc., please attach separate sheet[s] to describe and price the proposals.

B. Proposer Commitment. If selected by the City, the Proposer agrees to provide the Design Services and Construction Services for the Project for the total Contract Price set forth below, as witnessed by the signature(s) below. Each individual signing below warrants that he or she is authorized to do so by the party that he or she represents. (Include a notarized affidavit attesting to the authenticity of each signature. If DBE is a partnership or joint venture, all general partners or members must sign the Price Proposal form.)
Item SITE Design
Services
Construction
Services
General
Conditions1
Total2
1 Blackberry Farm
Recreation and Pool facility
2 Quinlan Community Center
3 Cupertino Sports Center
4 Community Hall
5 Cupertino Library
Totals
Notes:

1. Attach separate sheet showing breakdown of "general conditions" costs.

2. Attach separate sheet with any proposals for itemized cost savings. 885
CC 02-04-2025
885 of 985

Page 2 ends

City of Cupertino Photovoltaic Systems Design and Installation Project RFP for Design-Build Entities – Appendix F

PROPOSER/DESIGN-BUILD ENTITY
(Legal Name of Proposer/DBE)
Signature:

Date:

Name & Title:

Signature:

Date:

Name & Title:
886
CC 02-04-2025
886 of 985
City of Cupertino Photovoltaic Systems Design and Installation Project RFP for Design-Build Entities – Appendix G

CUPERTINO PHOTOVOLTAIC SYSTEMS DESIGN AND INSTALLATION PROJECT

APPENDIX G

NON-COLLUSION DECLARATION

TO BE EXECUTED BY PROPOSER AND SUBMITTED WITH PROPOSAL
The undersigned declares:

I am the [title] of
[business name], the party making the foregoing Proposal.

The Proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Proposal is genuine and not collusive or sham. Proposer has not directly or indirectly induced or solicited any other Proposer to put in a false or sham Proposal. The Proposer has not directly or indirectly colluded, conspired, connived, or agreed with any Proposer or anyone else to put in a sham Proposal, or to refrain from submitting a Proposal. The Proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Price Proposal of the Proposer or any other Proposer, or to fix any overhead, profit, or cost element of the Price Proposal, or of that of any other Proposer. All statements contained in the Proposal are true. The Proposer has not, directly or indirectly, submitted his or her Price Proposal or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham Proposal, and has not paid and will not pay, any person or entity for such purpose.

This declaration is intended to comply with California Public Contract Code § 7106.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on [date]
[City]
[State]
Signature
[print name]
• END OF NON-COLLUSION DECLARATION •
887
CC 02-04-2025
887 of 985
City of Cupertino Photovoltaic Systems Design and Installation Project RFP for Design-Build Entities – Appendix H Page 1

CUPERTINO PHOTOVOLTAIC SYSTEMS DESIGN AND INSTALLATION PROJECT

APPENDIX H
DBE Questionnaire
Part A: General Information
DBE Business Name: _______________________________________________ (“DBE”) Check One: ___ Corporation (State of incorporation: ___________________) ___ Partnership
___ Sole Proprietorship
___ Joint Venture of: _________________________________ ___ Other: __________________________________________
Main Office Address and
Phone
Local Office Address and
Phone
Website Address
Contact Name and Title
Contact Phone and Email
Bidder’s California
Contractor’s License
Number(s)
Bidder’s DIR Registration
Number
Part B: DBE Experience
1 How many years has each of the entities of the DBE been in business under the present business name? (in years) 2 Has the GC entity completed projects similar in type and size to this Project as a general contractor? (yes or no) 888
CC 02-04-2025
888 of 985
City of Cupertino Photovoltaic Systems Design and Installation Project RFP for Design-Build Entities – Appendix H Page 2
3 Has the DBE completed projects similar in type and size to this Project as this DBE? (yes or no)
4 Has DBE or any of its team ever been disqualified from a bid on grounds that it is not responsible, or otherwise disqualified or debarred from bidding under state or
federal law? (yes or no)
If yes, provide additional information on a separate
sheet regarding the disqualification or debarment,
including the name and address of the agency or
owner of the project, the type and size of the project, the reasons that DBE was disqualified or debarred,
and the month and year in which the disqualification
or debarment occurred.
4 Has DBE or any of its team ever been terminated for
cause, alleged default, or legal violation from a
construction project, either as a general contractor or as a subcontractor? (yes or no)
If yes, provide additional information on a separate
sheet regarding the termination, including the name
and address of the agency or owner of the subject
project, the type and size of the project, whether
Bidder was under contract as a general contractor or
a subcontractor, the reasons that DBE was
terminated, and the month and year in which the
termination occurred.
5 Provide information about Bidder’s past projects
performed as general contractor as follows:
a. Three most recently completed public works
projects within the last three years
b. Three largest completed projects within the last
three years
c. Any project which is similar to this Project
including scope and character of the work.

889
CC 02-04-2025
889 of 985
City of Cupertino Photovoltaic Systems Design and Installation Project RFP for Design-Build Entities – Appendix H Page 3
Part C: Project Experience
Provide information on at least three projects that are similar in scope and character to this project. Two of the projects must be public sector projects. (Use separate sheets if required) PROJECT #1
A Project name
B Project location
C Project description:

D Client/Owner (name, address, email, and
phone number
E Prime contractor, if applicable (name,
address, email, and phone number
F Architect or engineer (name, email, and
phone number
G Project and/or construction manager (name,
email, and phone number
H Scope of work performed (as general
contractor or as subcontractor
I Initial contract price $
J Final contract price (including change
orders);
$
K Original scheduled completion date
L Actual date of completion
M Time extensions granted (number of days)
N Number and amount of stop notices or
mechanic’s liens filed
O Amount of any liquidated damages
assessed against Bidder
P Nature and resolution of any projectrelated claim, lawsuit, mediation, or arbitration involving Bidder
Q Other Notes
890
CC 02-04-2025
890 of 985
City of Cupertino Photovoltaic Systems Design and Installation Project RFP for Design-Build Entities – Appendix H Page 4
PROJECT #2
A Project name
B Project location
C Project description:

D Client/Owner (name, address, email, and
phone number
E Prime contractor, if applicable (name,
address, email, and phone number
F Architect or engineer (name, email, and
phone number
G Project and/or construction manager (name,
email, and phone number
H Scope of work performed (as general
contractor or as subcontractor
I Initial contract price $
J Final contract price (including change
orders);
$
K Original scheduled completion date
L Actual date of completion
M Time extensions granted (number of days)
N Number and amount of stop notices or
mechanic’s liens filed
O Amount of any liquidated damages
assessed against Bidder
P Nature and resolution of any projectrelated claim, lawsuit, mediation, or arbitration involving Bidder
Q Other Notes
891
CC 02-04-2025
891 of 985
City of Cupertino Photovoltaic Systems Design and Installation Project RFP for Design-Build Entities – Appendix H Page 5
PROJECT #3
A Project name
B Project location
C Project description:

D Client/Owner (name, address, email, and
phone number
E Prime contractor, if applicable (name,
address, email, and phone number
F Architect or engineer (name, email, and
phone number
G Project and/or construction manager (name,
email, and phone number
H Scope of work performed (as general
contractor or as subcontractor
I Initial contract price $
J Final contract price (including change
orders);
$
K Original scheduled completion date
L Actual date of completion
M Time extensions granted (number of days)
N Number and amount of stop notices or
mechanic’s liens filed
O Amount of any liquidated damages
assessed against Bidder
P Nature and resolution of any projectrelated claim, lawsuit, mediation, or arbitration involving Bidder
Q Other Notes

892
CC 02-04-2025
892 of 985
City of Cupertino Photovoltaic Systems Design and Installation Project RFP for Design-Build Entities – Appendix H Page 6
Part D: Safety

1. Provide DBE’s Experience Modification Rate (EMR) for the last three years:

Year EMR

2. 2. Complete the following, based on information provided in DBE’s CalOSHA Form 300 or Form 300A, Annual Summary of Work-Related Illnesses and Injuries, from the most recent past calendar year:

2.1 Number of lost workday cases

2.2 Number of medical treatment cases

2.3 Number of deaths

3. Has the DBE ever been cited, fined, or prosecuted by any local, state, or federal agency, including OSHA, CalOSHA, or EPA, for violation of any law, regulation, or requirements pertaining to health and safety?
Yes or No?
If yes, provide additional information on a separate sheet regarding each such citation, fine, or prosecution, including the name and address of the agency or owner of the project, the type and size of the project, the reasons for and nature of the citation, fine, or prosecution, and the month and year in which the incident giving rise to the citation, fine, or prosecution occurred.

4. Name, title, and email for person responsible for DBE’s safety program:

893
CC 02-04-2025
893 of 985
City of Cupertino Photovoltaic Systems Design and Installation Project RFP for Design-Build Entities – Appendix H Page 7
Part E: Verification
In signing this document, I, the undersigned, declare that I am duly authorized to sign and submit this DBE Questionnaire on behalf of the named DBE, and that all responses and information set forth in this DBE Questionnaire and accompanying attachments are, to the best of my knowledge, true, accurate and complete as of the date of submission. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

Signature: ______________________________ Date: ________________ By: _______________________________________________________________ Name and Title
END OF BIDDER’S QUESTIONNAIRE
894
CC 02-04-2025
894 of 985

CUPERTINO PHOTOVOLTAIC SYSTEMS DESIGN AND INSTALLATION PROJECT

APPENDIX I

RFP RATING SHEET
Sect. Criteria (from Section 8 of the RFP) Max.

Points
Reviewer’s Notes Rating
1 Price 50
2 Schedule 30
3 Technical Design Expertise 15
4 Construction and Procurement Expertise 25
5 Proposed Design Approach 20
6 Proposed Procurement Approach 10
7 Proposed Construction Approach 15
8 Life-Cycle Costs Over 30 or More Years 5
9 Presentation 25
10 Responsiveness 5

Total 200
For Reference: a list of the required Proposal Contents:

A. Cover Le6er
B. Price Proposal Form
C. Schedule
D. Technical Design Expertise
E. Construction and Procurement Expertise
F. Design Approach
G. Procurement Approach
H. Construction Approach
I. Life-Cycle Costs
J. DBE Questionnaire
K. Non-Collusion Declaration
L. Exceptions
895
CC 02-04-2025
895 of 985

RFP ADDENDA
896
CC 02-04-2025
896 of 985
ADDENDUM NO. 1
Issued: December 4, 2024
Photovoltaics Systems Design and Installation Project
RFP
Submittals dues December 19, 2pm PST
TO ALL PROSPECTIVE FIRMS:

This addendum is issued to modify and/or clarify the previously issued RFP documents. You must indicate receipt of this addendum within the Proposal of your submittal. Failure to do so may cause rejection of your submittal.

QUESTIONS/CLARIFICATIONS
The following questions have been received by the City. The City response is below each question.

1. Files:

There have been some issues accessing the folders for the RFP materials and the RFP reference files. To improve access, the folders to a new location:

PV RFP 2024: https://cupertinogovmy.sharepoint.com/:f:/g/personal/susanm_cupertino_org/Etg1U4jCEvFBk4bcEo0GacYB naWxRr190Wck-Q6sztshVg?e=fdhLrw

There are two folders within:
a. “PV project RFP_for DBEs” - The RFP itself and all the attachments. b. “RFP - Existing Facility Docs_Reference” - drawings (etc) that we have on file for each facility.
**If proposers cannot access these files, please let the RFP administrator know.

2. Presentations. Once we receive your proposals, we typically have each firm give a presentation. The RFP says January 3, but we’re revising that to January 6 to give everyone a chance to return from the holiday vacation. Please hold 1-5pm on Monday, January 6, in your calendars for your presentations.
897
CC 02-04-2025
897 of 985

3. Site Visits. The Thursday 12/05 meeting is virtual/online and is meant to be a Q&A session for the most part (invite resent with tentative agenda). The City staff (CIP and PW Facilities) will be available for a site walk on Thursday December 12 at 10am, and will last approximately 2hours. Please meet in front of Community Hall (10350 Torre Avenue, Cupertino 95014). We will visit three project sites.

4. Scope revision. At the December 3 City Council meeting, Council approved proceeding with the implementation of the photovoltaic systems at three sites (not five):
• Community Hall
• Cupertino Sports Center
• Quinlan Community Center
Your proposals (scope and fee) should only include the three sites listed above.

Cupertino Library and Blackberry Farm sites’ scope is now deleted from the project and should not be included in the proposal.

The official minutes will not be published until after the next Council meeting, but the draft minutes are copied below, for your reference:

MOTION: Fruen moved and Chao seconded the recommended action to approve the Capital Improvement Programs Photovoltaic Systems Design and Installation Project conceptual design for three City of Cupertino facilities: Community Hall, Cupertino Sports Center, and Quinlan Community Center. Moore made a friendly amendment that any trees that are removed will be replaced by a 24” box size tree which is climate appropriate or California native, and those trees would be placed within City properties. (Fruen and Chao accepted the friendly amendment). The amended motion carried with the following vote: Ayes:

Mohan, Fruen, Chao, and Moore. Noes: None. Abstain: None. Absent: Wei.

APPROVED BY:

Chad Mosley
Director of Public Works
898
CC 02-04-2025
898 of 985
ADDENDUM NO. 2
Issued: December 18, 2024
Photovoltaics Systems Design and Installation Project
RFP
Submittals due December 27, 10am PST
TO ALL PROSPECTIVE FIRMS:

This addendum is issued to modify and/or clarify the previously issued RFP documents. You must indicate receipt of this addendum within the Proposal of your submittal. Failure to do so may cause rejection of your submittal.

QUESTIONS/CLARIFICATIONS
The following questions have been received by the City. The City response is below each question. Questions/Answers 1 – 4 were included in Addendum #1.

5. Q: Who will be responsible for removing the saplings on the north side of the parking lot at Quinlan?
A: The younger trees on the north edge of the Quinlan back parking lot (see images below, approximately 14 trees) were planted by PW staff a couple of years ago. They went in as 24” box trees. The scope of work should include the removal (or relocation) of these trees, and the replacement of these trees by a matching number of 24” box trees. Species of the replacements will be “climate appropriate or California native” (following the City Council directive) but also adherent to the City standards for tree species in an ‘understory’ location. The City’s Street Tree List is under review but will be issued in the Spring of 2025. That list will be a helpful directive for species specifications.

Cupertino Municipal Code (CMC) 14.18.150 has a list of Protected trees that require a tree removal permit.
899
CC 02-04-2025
899 of 985

6. Q: For trees that will be removed is there a specification as to the depth of stump grinding required?
A: The City does not have a specification for this, but for this project we are asking that the stump to be removed to a depth of 24” or remove the entire stump.

7. Q: Does the City have a preferred roofer or any roof warranties? A: The roofs at all three locations are no longer under warranty. The project scope of work will directly affect the roofs at Quinlan Community Center (terracotta clay tile roofing) and Community Hall (standing seam metal roofing). The two roofers PW has used in the recent past are listed below. [These vendors may not be optimum for the types of roofs at these locations.] Dan Lajeunesse
Sr. Field Advisor / Bay Area Market Lead
Tremco Roofing & Building Maintenance
M. 408.910.2083
[email protected]
San Jose, CA
www.tremcoroofing.com
DONE RIGHT, INC.
1129 Longfellow Avenue
Campbell, CA 95008
PH. (408) 377-8777
FAX (408) 377-5502

8. Q: The proposed system size for the Sports Complex is larger than what can be supported by the existing transformer. Has there been communication with PG&E to upgrade the transformer? Who would be responsible to coordinate with PG&E for the transformer upgrade? A: The successful DBE will be responsible for coordinating all services required with PG&E. As part of the PG&E interconnection process, the Utility does an initial review of the proposed 900
CC 02-04-2025
900 of 985
array in context of the existing utility service. The outcome of that review was an assertion that mitigation is not required.

The single line diagram (SLD) from the existing drawings (see snippet below and link at the end of this answer) indicate a transformer smaller than 277/480v. However, the transformer shown below appears to be a City-owned transformer downstream of the incoming utility feed utilized to supply lower-voltage loads on site. Photos from visiting the site during the conceptual design phase show the site service to be 277/480V. This transformer is shown at 480V on the primary side, which is compatible with a 277/480V service.
901
CC 02-04-2025
901 of 985
902
CC 02-04-2025
902 of 985
The PDF file “Sports Center Tennis Court Lighting 2009 lores” was added to the Sports Center folder of the Reference drawings:
https://cupertinogovmy.sharepoint.com/my?id=%2Fpersonal%2Fsusanm%5Fcupertino%5Forg%2FDocuments%2FPV%20 RFP%202024&sortField=Modified&isAscending=false&ga=1
or
PV RFP 2024

9. Q: The “Buy American” specification is something that increases cost and lead time. Is the funding for this project attached to Buy American? Will alternative materials be considered? If an alternative is presented how many points will be deducted from Item 6 of the evaluation factors?
Q: What flexibility will be offered regarding domestic content? This could impact the overall schedule.

A: Successful participation in the “Buy American” program will allow for a 10% increase on the rebate possible from the Inflation Reduction Act direct pay program, which may amount to as much as ~$500,000. The City finds that rebate quite attractive. However, other means and methods may positively affect the project costs to the City. An overall expertise and comprehensive approach to the procurement, especially in light of the schedule requirements, is quite important. The points for “Proposed Procurement Approach” within the Evaluation Factors (as noted in the RFP) are not as prescriptive as implied here, and the City is most interested in a DBE who exhibits expertise and schedule-awareness in the procurement process and details proposed within it.

10. Q: With our site walk taking place on 12-12-2024 and proposals being due one week later on 12- 19-2024. We would request the bid date be extended to 12-27-2024. Some site conditions require additional considerations.

A: We are revising the schedule, including the due date and presentations. The Schedule from Section 4 of the RFP is included below and the revised dates are in red text.

ACTIVITY DATE and TIME
RFP distributed to shortlisted DBEs Thursday, November 14 2024 Informational Meeting Thursday, December 5, 2024,
11AM PST
Site Visit – Community Hall, Sports Center, Quinlan Community Center Thursday, December 12, 2024, 10AM PST
Deadline for RFP questions/objections Thursday, December 19, 2024, 2PM PST
Proposal Submittal Deadline Friday, December 27, 2024,
10AM PST
Preliminary Review of Proposals by Evaluation Panel January 2 – January 8, 2025 Private Presentation of Responsive Proposals Thursday, January 9, 2025 903
CC 02-04-2025
903 of 985
Private Discussions and/or Negotiations (City option) January 10-21, 2025 City Council award of Design-Build Contract February 4, 2025 Notice of Intent to Award issued ~January 23, 2025
Notice to Proceed with Design Services (anticipated) February 5, 2025 The following project phases will be scheduled/anticipated by the DBE and should be included in the proposal.

Design Development (DD) and Construction Documents (CD) Phases for each site:
• DD drawings and specifications
• CD drawings and specifications
• Permit Applications, Reviews and Issuance
[DBE]
Notice to Proceed with Construction Services for each site [DBE] Construction Mobilization including submittals for each site [DBE] Construction (durations and milestones for each site) [DBE] Final Completion April 1, 2026

11. Q: Syserco had prior knowledge, time and engineering to develop this project. Does this create an advantage to their score from the rating score 3-7?
A: Syserco did develop the conceptual design as indicated in the Bridging documents. The City does not see this as an advantage in the RFP evaluation process.

12. Q: The current sample contract has areas we may take some exception to. Will we be able to negotiate mutually agreeable terms and modify the sample contract prior to award? A: The standard terms and conditions of the City’s contracts are not typically negotiated. Other terms and conditions may be reviewed with City staff and our City Attorney’s Office.

APPROVED BY:

Susan Michael
CIP Manager, Public Works
_____________
904
CC 02-04-2025
904 of 985
ADDENDUM NO. 3
Issued: December 24, 2024
Photovoltaics Systems Design and Installation Project
RFP
Submittals due December 27, 10am PST
TO ALL PROSPECTIVE FIRMS:

This addendum is issued to modify and/or clarify the previously issued RFP documents. You must indicate receipt of this addendum within the Proposal of your submittal. Failure to do so may cause rejection of your submittal.

QUESTIONS/CLARIFICATIONS
The following questions have been received by the City. The City response is below each question. Questions/Answers 1 – 4 were included in Addendum #1. Questions 5 - 12 were included in Addendum #2. Additional information is provided on #11 and #12 in this addendum.

11. Q: Syserco had prior knowledge, time and engineering to develop this project. Does this create an advantage to their score from the rating score 3-7?
A: (12/18/24 response) Syserco did develop the conceptual design as indicated in the Bridging documents. The City does not see this as an advantage in the RFP evaluation process.

A: (12/24/24 additional information): Please know that Syserco was purposefully not involved in developing the RFP, and their work on the bridging documents was limited to align with allowances in State law. Also, any information they have provided is made available to all potential DBE’s in accordance with State law.

12. Q: The current sample contract has areas we may take some exception to. Will we be able to negotiate mutually agreeable terms and modify the sample contract prior to award? A: (12/18/24 response) The standard terms and conditions of the City’s contracts are not typically negotiated. Other terms and conditions may be reviewed with City staff and our City Attorney’s Office.

A: (12/24/24 additional information): we state in Section 9 that we will “provide the Selected DBE with a completed copy of the Design-Build Contract based on the Selected DBE’s Proposal and any subsequently negotiated terms or additional information…” In Section 2, C. we state, “The City will not consider requests to modify the form of the Design-Build Contract, General Conditions, or bond forms.”
905
CC 02-04-2025
905 of 985
It is important to clarify that any questions on the forms or contract negotiated terms are only applicable as it relates to the project approach for any vendor, and not the contract form itself.

13. Q: Is there any particular format, or content that your team would like to see presented during the interview? We are wondering if there are any guidelines you’d like us to follow? Or, should we not prepare a presentation and just be prepared for Q&A? A: For the presentation/interviews/discussions on January 9th, please be prepared with a short presentation to introduce your team and outline the highlights of your proposal. We will follow that with a discussion on, and questions pertaining to, your proposal.

14. Q: The price proposal form is requesting 2 signatures with a notarized affidavit. This may be a challenge with the holiday. We will have an officer’s signature on the price proposal but may not have 2 officers and the notarized affidavit. Will it be acceptable to provide these documents at a later date?
A: The notarized affidavit should be emailed by 2pm on Tuesday January 7th .

APPROVED BY:

Susan Michael
CIP Manager, Public Works
_____________
906
CC 02-04-2025
906 of 985

CITY OF CUPERTINO
Agenda Item
25-13671 Agenda Date: 2/4/2025
Agenda #: 11.

Subject: Study Session for the use of Committed Future Use Reserve one-time funds (Continued from the January 22, 2025 City Council meeting)
Provide staff direction on the future allocation of how the City should allocate one-time funds from the future use reserve
CITY OF CUPERTINO Page 1 of 1 Printed on 1/28/2025
powered by Legistar™907
CC 02-04-2025
907 of 985

CITY COUNCIL STAFF REPORT
Meeting: January 22, 2025
Subject
Study Session for the use of Committed Future Use Reserve one-time funds.

Recommended Action
Provide staff direction on the future allocation of how the City should allocate one-time funds from the future use reserve.

Reasons for Recommendation
Background
At the November 19, 2024, City Council meeting, staff proposed three different options for allocating $74.5 million in one-time funds resulting from the uncommitting of the Sales Tax Repayment Reserve. A copy of this staff report is included as Attachment A.

City Council approved an alternative approach, allocating $10.0 million to a one-time Additional Discretionary Payment to CalPERS to address the City’s Unfunded Accrued Liability retirement costs and establishing the Committed Future Use Reserve for the remaining $64.5 million. Additionally, Council directed staff to conduct a study session in January 2025 to explore potential uses for the remaining one-time funds.

Detailed reductions implemented in the FY 2023-24 and FY 2024-25 Adopted Budgets are included in the staff report as Attachments B and C.

Next Steps
Following the study session, staff will incorporate Council’s direction into the FY 2024-25 Mid-Year Financial Report and/or the FY 2025-26 Proposed Budget.

Sustainability Impact
No sustainability impact.

Fiscal Impact
There are no fiscal impacts as part of this study session. 908
CC 02-04-2025
908 of 985
City Work Program (CWP) Item:

No.

CWP Item Description:

Not applicable.

Council Goal:

Public Engagement and Transparency
Sustainability and Fiscal Strategy
Environmental Quality Act
Not applicable.
_____________________________________
Prepared by: Toni Oasay-Anderson, Senior Management Analyst Reviewed by: Kristina Alfaro, Director of Administrative Services Reviewed by: Tina Kapoor, Deputy City Manager
Approved for Submission by: Pamela Wu, City Manager
Attachments:

A – November 19, 2024 Staff Report and Allocation Plan
B – FY 2023-24 Budget Reductions
C – FY 2024-25 Service Level Reductions
909
CC 02-04-2025
909 of 985

CITY COUNCIL STAFF REPORT
Meeting: November 19, 2024
Subject
Allocation plan for funds uncommitted from the Sales Tax Repayment reserve Recommended Action
Option A:

A. Adopt Option A
Option B:

A. Adopt Option B
B. Adopt Resolution No. 24-XXX approving budget modification No. 2425-366, increasing appropriations by $11,688,705
C. Adopt Resolution No. 24-XXX amending the Unrepresented Employees’ Compensation Program
D. Approve new three-year limited term Grants Analyst position for grants management E. Approve new Assistant Director of Administrative Services, Grants Analyst, Senior Business Systems Analyst and Supervising Code Enforcement classifications Option C:

A. Adopt Option C
B. Adopt Resolution No. 24-XXX approving budget modification No. 2425-366, increasing appropriations by $11,688,705
C. Adopt Resolution No. 24-XXX amending the Unrepresented Employees’ Compensation Program
D. Approve new three-year limited term Grants Analyst position for grants management E. Approve new Assistant Director of Administrative Services, Grants Analyst, Senior Business Systems Analyst and Supervising Code Enforcement classifications Reasons for Recommendation
City staff evaluated feedback received from the October 15 Council meeting, reviewed budget surveys collected during the last two fiscal years of budget reductions and received 910
CC 02-04-2025
910 of 985
department feedback to develop a preliminary plan to mitigate the impact of budget cuts implemented in the Fiscal Year 2023-24 and 2024-25 budgets.

The preliminary plan outlines guiding principles that were considered before presenting for Council consideration and areas of focus to ensure the recommended allocation options include variable funding for the community, staff, and capital investments for the City.

Background
On October 4, 2024, the City finalized a settlement agreement with the California Department of Tax and Fee Administration (CDTFA) resolving the CDTFA’s proposed reallocation of disputed sales tax received by the City. On October 15, 2024, the Council approved staff recommendation to uncommit $74.5 million in funds set aside for the potential repayment of disputed sales tax previously received by the City. The purpose of this proposed allocation plan is to provide Council options for the potential one-time allocation of the $74.5 million that is now unassigned (Attachment A). As explained in detail in the allocation plans, the options presented by staff attempt to balance the City’s need for long-term investment and the desire to restore certain reductions with the need for long-term fiscal prudence, given the reduction in future sales and use tax revenues that the City will experience.

The options include potential funding for infrastructure projects, restoring reduced services, and setting some funding aside. The need for additional classifications results in no new positions except the limited-term Grants Analyst. The request for one three-year limited term Grants Analyst position to assist with grant applications, tracking and reporting along with purchasing support may be funded via donation, but if not is anticipated to be cost recovery via grants obtained. The need for staffing changes is due to reductions made either being too deep to continue the work already allocated, or because of how duties and responsibilities have been redistributed due to contract and staffing reductions.

All options presented are summarized in the table below. Additional details are included in the Allocation Plan (Attachment A).

Allocation Plan Capital Fund
Reserve
Allocations for
current use
General Fund
Reserves
Option A
Option B
Option C
Next Steps
Based on the direction that Council provides, staff will make all changes in the financial system and updates on the funds will be provided as part of the mid-year financial report. 911
CC 02-04-2025
911 of 985
Sustainability Impact
No Sustainability Impact.

Fiscal Impact
Should City Council approve an option that includes current allocations as listed in Attachment E, appropriations would increase by $11,688,705. Funding for these increased expenses will come from unassigned fund balance that, with the recommended funding additions, is estimated to end Fiscal Year 2024-25 with $154.3 million. Should Council approve an option with no current year allocations, estimated year-end fund balance will remain unchanged from the first quarter report and is estimated at $166 million in the general fund.

City Work Program (CWP) Item:

No
CWP Item Description:

Not Applicable.

Council Goal:

Sustainability and Fiscal Strategy
California Environmental Quality Act:

Not Applicable.

Prepared by: Jonathan Orozco, Finance Manager
Reviewed by: Kristina Alfaro, Director of Administrative Services Christopher Jensen, City Attorney
Approved for Submission by: Tina Kapoor, Acting City Manager Attachments:

A – One-time Funds Allocation Plan Fiscal Year 2024-25
B - Committed, Unassigned Fund Balance, and Use of One Time Funds Policy Options A and B (Redline)
C - Option A Committed, Unassigned Fund Balance, and Use of One Time Funds Policy (Clean)
D – Option B Committed, Unassigned Fund Balance, and Use of One Time Funds Policy (Clean)
E – Detailed allocation plan for current use
F – Budget Resolution
G – Assistant Director of Administrative Services Position Description H – Grants Management Analyst Position Description
I – Code Enforcement Supervisor Position Description
J – Senior Business Systems Analyst Position Description 912
CC 02-04-2025
912 of 985
K – Unrepresented Employees’ Compensation Program (Redline) L – Draft Resolution Amending the Unrepresented Employees’ Compensation Program M – Unfunded CIP List
913
CC 02-04-2025
913 of 985
Attachment A
One-time Funds Allocation Plan
Fiscal Year 2024-25
Background
Due to a favorable negotiated settlement, the Council has uncommitted $74.5 million dollars in one-time funds. The options outlined in this plan are intended to provide the Council with recommendations for how these dollars can be allocated. In creating the three different potential options for allocating these dollars, staff developed Areas of Focus and Guiding Principles that have influenced the allocation plan options discussed in this report. Staff also reviewed prior budget surveys to assess areas that the community wanted to scale back on or retain, and lastly reviewed service level reductions and unmet needs to develop potential use of these dollars in the current fiscal year.

Areas of Focus
Staff reviewed reductions made to date and the following focus areas were identified to ensure the recommended allocation options included variable funding for the community, staff, and City infrastructure:

I. Restoring Community Benefits – Prioritizes adding back any community benefits that had been reduced where practical, and where ongoing funding is minimal to not increase the structural deficit.

II. Restoring Reduced Services – Prioritizes restoring reduced services where practical, and where ongoing funding is minimal to not increase the structural deficit.

III. Investing in Employees – Prioritizes funding for training and development, reclassifications where necessary to align with new duties and responsibilities because of budget reductions and, new positions where practical and where ongoing funding is minimal to not increase the structural deficit.

IV. Enhancements – This includes any new funding requests that are not a restored budget reduction.

Guiding Principles
I. One-time funds should be allocated for one-time expenses that result in ongoing savings and/or efficiencies.1

1 Examples of this include funding for pavement and retiree health unfunded actuarial liability made when the City received one-time funds related to the sale of Pruneridge Ave. These decisions paid off during our most recent budget reductions when the city could significantly reduce spending on pavement with minimal impacts and was able to use the funding in the retirement health fund to cover two years of costs. Both of these significantly assisted in balancing the budget. 914
CC 02-04-2025
914 of 985
II. One-time funds should be allocated for one-time expenses, even if that allocation doesn’t result in ongoing savings and/or efficiencies.

III. Funds should be held for future use when immediate needs are not present.

IV. Limited use of funds on ongoing expenses to limit increasing the structural deficit.

Allocation Plan Options
Staff has developed three options for Council consideration for the allocation of or reserving the funds. The highlights of each plan are summarized in the table below:

Allocation Plan Capital Fund
Reserve
Allocations for
current use
General Fund
Reserves
Option A
Option B
Option C
OPTION A – No allocation recommendations; funds are to be held in a new committed reserve.

Under this option, the City Council would create a “Reserve for Future Use,” committing funds for future needs to be determined by the City Council. This reserve would be drawn down as the funds are expended and would not be replenished, as these are one-time funds resulting from the uncommitted sales tax repayment reserve.

As outlined on page 167 of the Fiscal Year 2024-25 Final Budget, committed reserves “include amounts that can be spent only for specific purposes determined by formal action of the City’s highest decision-making authority, the City Council. Commitments may be changed or lifted only by the City taking the same formal action (resolution) that imposed the constraint originally.” The City currently faces operational needs, such as aging infrastructure, that—if left unaddressed—could lead to additional operational costs not currently included in the forecast.

However, holding these funds as a reserve for future needs carries certain financial limitations due to inflation. The following tables provide a 10-year historical comparison of inflation against annualized returns from the 1-5 Year Treasury and Agency Index benchmark (provided by Chandler Asset Management) and the Local Agency Investment Fund (LAIF). The inflation rate is based on data from the U.S. Bureau of Labor Statistics, Consumer Price Index for All Urban Consumers: All Items in San Francisco-Oakland-Hayward, CA.

Below are two charts comparing the effects of inflation on investing uncommitted funds against two benchmarks for investment vehicles currently utilized by the City. As shown in the first chart, which compares inflation to long-term investments, the purchasing power of the $74.5 million reserve would decline by approximately $10 million over 10 years if interest is reinvested. This decline is even steeper, over $20 million, if the interest is instead used to support operations. The 915
CC 02-04-2025
915 of 985
second chart presents a similar comparison with LAIF returns, where the purchasing power of the $74.5 million reserve decreases by around $13 million if interest is reinvested over 10 years and by more than $20 million if the interest supports operations. 916
CC 02-04-2025
916 of 985
This analysis demonstrates that inflation continues to outpace investment returns, making this holding strategy unsustainable over the long term. The California Government Code imposes restrictions on the types and durations of investments allowed, which limits potential returns and underscores the priority of safety and liquidity over yield. Given these constraints, this option may not provide the necessary growth to preserve the reserve’s purchasing power for future needs.

OPTION B – Allocates funds for spending, allocates funds in a committed reserve in the General Fund, and any remaining funds are transferred to the Capital Reserve. This option provides a balanced approach to how these funds might be used. Allocating funds for aging infrastructure, departmental needs and leveraging one-time dollars to provide ongoing savings and or efficiencies. This option also sets aside funding to cover the structural deficits in the 10-year forecast.

Allocations for Future Use:

Area of
Focus
Guiding
Principal
Description Allocation
One-time
Allocation
Ongoing
Enhancement Hold funds for
future use
Transfer to the Capital
Reserve. Public works staff
will return at a future date
with a spending plan for
$31,811,295 $0
917
CC 02-04-2025
917 of 985
these dollars. It is
anticipated that based on
the list of projects
presented and
subsequently adopted
additional staffing may be
necessary to support an
increase in the CIP
projects. See attachment M
for unfunded CIP list.

Enhancement Hold funds for
future use
Create a committed
reserve in the General
Fund for estimated
deficits in the 10-year
forecast. Funds are
estimated for use
beginning in FY 2028-29
through FY 2033-34.

Should alternate revenue
sources and or additional
reduced spending be
identified to produce a
balanced budget in all
years of the forecast, staff
would return to Council
to uncommit these funds.
$31,000,000 $0
Total Allocations for Future Use $62,811,295 $0
Allocations for Current Use, see Attachment E for more detail:

Area of Focus Guiding
Principal
Description Allocation
One-Time
Allocation
Ongoing
Restoring of
Community
Benefits
N/A All but one community
benefit item was not
reduced
$0 $0
Restoring
Reduced
Service
N/A Staff is still determining
the workability of
increasing any reduced
service and will return
later with a proposal if
needed.
$0 $0
Investing in
Employees
One-time funds
with ongoing
Invest $10 million
towards CalPERS
$10,769,166 $175,500
918
CC 02-04-2025
918 of 985
Area of Focus Guiding
Principal
Description Allocation
One-Time
Allocation
Ongoing
savings or
efficiencies,
and limit
ongoing
expenses
unfunded actuarial
liability payment
(following section for
more detail.) Purchase of
a new Enterprise
Resource Planning
Software (Finance/HR)
and increases to training
funding citywide to 50%
of what was originally
reduced (ongoing).

Enhancements One-time funds
with ongoing
savings or
efficiencies
Staffing study $66,000 $0
One-time funds Purchase of goods,
studies, software and
enhance physical safety
controls at City Hall.
$500,000
Limit ongoing
expenses
New limited term Grants
analyst and new
classifications
$0 $178,039
Total all allocations for immediate use $11,335,166 $353,539 CalPERS One-Time Allocation to Unfunded Actuarial Liability (UAL) UAL is defined by CalPERS as “the amortized dollar amount needed to fund past service credit earned (or accrued) for members who are currently receiving benefits, active members, and for members entitled to deferred benefits, as of the valuation date.” To address this liability, the City is considering a one-time Additional Discretionary Payment (ADP) of $10 million. If implemented, this ADP is projected to decrease the City’s cash outflows over the next 10 years by approximately $13 million, resulting in net savings of $3 million. The estimated impact on retirement payments is illustrated in the chart below.
919
CC 02-04-2025
919 of 985
In addition to cash flow savings, this one-time payment would immediately improve the funded status of the City’s retirement plan, raising it from 67% to 75% in the first year. Although the funded status improvement narrows over the 10-year forecast, the ADP maintains a higher funded status than without the payment, as shown in the table below.

Note: Projections in the charts are provided by CalPERS’ Managing Employer Contributions Tool. -
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
7,000,000
CalPERS Projected Annual UAL Payments
Annual UAL Payment (Original) Annual UAL Payment (w/ ADP)

60.0%

65.0%

70.0%

75.0%

80.0%

85.0%

90.0%

95.0%
CalPERS Projected Funding Status
Funded Status Funded Status (w/ ADP)
920
CC 02-04-2025
920 of 985
OPTION C – Allocates funds for all current year budget requests and transfers all remaining funds to Capital Reserve for future use. This transfer would bring the Capital Reserve total to an estimated $65.7 million. This option leaves no funds from the sales tax payment reserve in the unassigned category. All funds after funding requests are met would be moved to the Capital Reserve Fund.

This option transfers all funds to the Capital Reserve for future spending and allocates no funds to a reserve or unassigned account to fund potential structural deficits in the out years, leaving the city vulnerable to future budget reductions.

Description Allocation
One-Time
Allocation
Ongoing
Fund all allocations in the
Allocations for Current Use table
above (green).
$11,335,166 $353,539
Transfer remaining balance to
Capital Reserve to fund future
Capital Improvement Plan (CIP)
projects.
$62,811,295 -
Total Reserve Recommendations $74,146,461 $353,539
GRAND TOTAL OPTION C $74,146,461 $353,539
In conclusion, three options are presented for Council consideration. With council direction, staff will bring updates on the funds based on council direction as part of the FY 2024-25 MidYear Financial Report. 921
CC 02-04-2025
921 of 985
 





 !"#"$%"&'()*+ , *)+-


*




./

 



0*

1

2
3
041235.**
(
!"#"$%"&6*''7&8
922
CC 02-04-2025
922 of 985








923
CC 02-04-2025
923 of 985




 








 !

"
#

$"


%&
'(')!'*
+
",-



",


"." /
0#,

.


/
1 


",
#"
# 
.
#,
""#
#,#,


2 


"3

#, $

#"
#
 
4.#



"
#

5#

$

6  
7#"4
856792


.. -





: 
;
;" 0

 "
;
$
5/
5
# 
#
<#

/
#"
=.

;
'(')-

5$$
#/
#>


  

"
#




,#/
.
.
"

?)@A2@B(-
+
"
#
5
# 
"
 #2
#/
?C'A2A)A

$#
;

"
#
#

)
;
<
/
#2


D


"
 "






#
;
#"#,
;




$
-
ED


0#,

##!.
;
#"
;
!.
;

,#F#
2 

##,


#
;#F"

"-

%&
'(')!'*
="."
+
",+
",
G

,*'
924
CC 02-04-2025
924 of 985








925
CC 02-04-2025
925 of 985








926
CC 02-04-2025
926 of 985

CITY OF CUPERTINO
Agenda Item
25-13621 Agenda Date: 2/4/2025
Agenda #: 12.

Subject: Study session on revisions to the Cupertino City Council Procedures Manual Consider revisions to the Cupertino City Council Procedures Manual CITY OF CUPERTINO Page 1 of 1 Printed on 1/28/2025
powered by Legistar™927
CC 02-04-2025
927 of 985

CITY COUNCIL STAFF REPORT
Meeting: February 4, 2025
Subject
Study session on revisions to the Cupertino City Council Procedures Manual Recommended Action
Consider revisions to the Cupertino City Council Procedures Manual Reasons for Recommendation
On February 7, 2023, the City Council adopted Resolution No. 23-021, approving the Cupertino City Council Procedures Manual (Attachment A). The adoption of the Procedures Manual addressed an identified deficiency in the City’s governance policies.

The Manual includes rules and guidelines for communication, meeting management, decorum, and decision making. The Procedures Manual was subsequently amended in March 2024 (Resolution No. 24-024).

The City Council may periodically consider revisions to the City Council Procedures Manual. Among the revisions the City Council may consider are:
x Enhancements to the enforcement procedures in Section 10 of the Manual, to add more detail regarding the disciplinary process for violations of the law or City policy.
x Revisions to Section 6 (Relationship with City Staff). x Revisions to the agenda-setting process (Section 7).
x Expansion of Municipal Code requirements for posting written communications on non-agenda items.
x Revisions to the process for removing items from the consent calendar (Section

8.4.2).
x Revisions to the rules for Council deliberations (Section 8.8.3). x Clarification of the processes for meetings that occur after a Monday holiday. x Formalization of the information memorandum process used to provide offagenda updates to the City Council. x Other minor changes to reflect current practices, including the incorporation of recent changes to the staff report format adopted by the City Manager’s Office and clarification of the requirements for Councilmember reports. 928
CC 02-04-2025
928 of 985
The purpose of this study session is to receive direction from the City Council on the issues listed above as well as any other changes to the Procedures Manual Council wishes to consider. The City Attorney’s Office will return to Council with proposed updates to the Procedures Manual based on the direction provided by the City Council.

Sustainability Impact
No sustainability impact.

Fiscal Impact
No fiscal impact.

City Work Program (CWP) Item:

N/A
CWP Item Description:

N/A
Council Goal:

Public Engagement & Transparency
California Environmental Quality Act
Not applicable.
_____________________________________
Prepared by:

Reviewed by:

Approved for Submission by:

Christopher D. Jensen, City Attorney
Tina Kapoor, Deputy City Manager
Pamela Wu, City Manager
Attachments:

A - Resolution No. 24-024 (Cupertino City Council Procedures Manual) 929
CC 02-04-2025
929 of 985
RESOLUTION NO. 24-024

A RESOLUTION OF THE CUPERTINO CITY COUNCIL ADOPTING

CUPERTINO CITY COUNCIL PROCEDURES MANUAL
WHEREAS, on February 7, 2023, the Cupertino City Council adopted Resolution No. 23-021, adopting the Cupertino City Council Procedures Manual; and
WHEREAS, on March 5, 2024, the City Council considered revisions to the City Council Procedures Manual, and directed the City Attorney to prepare amendments to the Procedures Manual for Council consideration, said amendments which were presented to the City Council on March 19, 2024.

NOW, THEREFORE, BE IT RESOLVED that:

1. The City Council hereby adopts the Cupertino City Council Procedures Manual, as amended, attached hereto as Exhibit A.

2. Resolution No. 23-021 and any other procedures, policies, or rules that are inconsistent with the Council Procedures adopted herein are hereby repealed and rescinded.

3. This Resolution shall take effect on March 20, 2024.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 19th day of March, 2024, by the following vote:

Members of the City Council
AYES: Mohan, Fruen, Wei
NOES: Chao, Moore
ABSENT: None
ABSTAIN: None
930
CC 02-04-2025
930 of 985
Resolution No. 24-024

Page 2 ends

SIGNED:

Sheila Mohan, Mayor
City of Cupertino
Date
ATTEST:

Kirsten Squarcia, City Clerk Date
3/27/2024
3/27/2024
931
CC 02-04-2025
931 of 985
1 City of Cupertino
City Council Procedures
Manual
Attachments:

Ex. A – Elected Officials’
Compensation Program
Ex. B – Council Technology Policy
Ex. C – Resolution No. 07-103
Ex. D – Municipal Code Chapter 2.17
Effective Date:

March 20, 2024
Responsible Departments:

City Manager’s Office
Related Policies & Notes:

See Exhibits A–D.

1. Introduction

1.1 Purpose. The purpose of this Manual is to promote communication, understanding, fairness, and trust among the members of the City Council, City staff, and members of the public concerning their roles, responsibilities, and expectations for management of the business of the City of Cupertino.

1.2 Values. Courtesy and respect for individual points of view should be practiced at all times. All Councilmembers shall respect each others right to disagree. All Councilmembers shall act with decorum and courtesy.

1. 3 Brown Act.All actions ofthe City Council and City commissions, committees, and subcommittees shall comply with the Ralph M.Brown Act.

2. Selection of the Mayor and Vice Mayor 2.
1 Selection ofMayor andVice Mayor.The MayorandVice Mayor shallbe selected annually at a special meeting on the second Thursday of December.

The Mayor and Vice Mayor shall not serve consecutive terms; provided, however, this provision shall not prevent the Vice Mayor from succeeding tothe office of Mayor.2.
2 Removal ofMayor and Vice Mayor.The MayororVice Mayor may be removed from office, for cause, by a 4/ 5ths affirmative vote of the members.

Removal for cause shall mean removalofa Councilmember because of such members a)willful and continued failure
932
CC 02-04-2025
932 of 985
2 substantially to perform their duties, (b) conviction for, or guilty plea to, a felony, or a crime involving moral turpitude, (c) abuse of illegal drugs or other controlled substances or habitual intoxication, or (d) other illegal activities. The removal should proceed with a formal warning, which states with proven evidence of the member's failure to perform their duties and proposed corrective measures. The Mayor or Vice Mayor must be advised of the proposed cause for removal at least 72 hours before any action is taken. Ifthe Mayor is removed from office, the Vice Mayor shall become Mayor. If either officer is removed from office, the Vice Mayor

3. Councilmember Committees and Subcommittees

3.1 Appointment. The Mayor shall appoint Councilmembers to standing and ad hoc committees and subcommittees established by the City Council, subject to ratification by the Council at its next regular meeting. It will be the responsibility of the committees and subcommittees to inform and submit recommendations to the Council.

3.2 Instructions and Expectations. The Council shall make certain that all Council committees and subcommittees are properly instructed in their assigned scope of work and responsibilities. The committee' s or subcommittee's jurisdiction shall be defined in writing and approved by a majority of the City Council. All Council committees and subcommittees having a continuing or indefinite jurisdiction shall be subject to the Brown Act.

3.3 Reporting. Council committee and subcommittee members are to keep the Council informed of the work and progress of their committee or subcommittee. These reports or minutes shall be made in writing whenever a recommendation is made to the Council. 4 Other City Commissions and Committees

4.1 Responsibility. The Council will make appointments to City's commissions and committees. Qualifications to serve on commissions and committees shall be set forth in the Municipal Code or by a resolution or motion of the Council that is not inconsistent with the Municipal Code. Appointment of Councilmembers to City committees shall be governed by the procedures in Section 3.
933
CC 02-04-2025
933 of 985
3 4.2 Attendance at Council Meetings. The Chair or another commission member appointed by the Chair shall attend City Council meetings whenever the commission makes a recommendation to Council regarding an item of business on the Council agenda. The commission liaison shall promptly notify the Chair after an item requiring a commissioner’ s appearance is placed on a future City Council agenda.

4.3 Performance Expectations. The Council shall make certain that all commissions and committees are properly instructed on their responsibilities and performance expectations. This will include the issuance of a Council- approved Commission and Committee Handbook and a mandatory annual training session for all Commission and Committee members.

4.4 Appointment. Commission and Committee applicants will be interviewed by the Council before being voted on by the Council in a noticed public meeting. Applicants are considered by motion and appointed by a majority vote of Council. Two members of an immediate family or persons residing in the same household shall not be allowed to serve simultaneously on the same commission or committee.

Immediate family members residing in the same household as a Councilmember are not eligible for appointment to any commission or committee. Former Councilmembers are not eligible for appointment to any commission or committee within four years of having served on the City Council.

4.5 Removal. The City Clerk shall remove commission members for failure to comply with attendance policies adopted in the Commissioner's Handbook. Council retains full discretion to review commission and committee member performance and may take disciplinary action as needed, including removal from the commission or committee.

4.6 Undue Influence on Commissioners. Councilmembers should not attempt to influence or publicly criticize commission recommendations or to influence or lobby individual commission members on any item under their consideration. It is important for commissions to be able to make objective recommendations to the City Council on items before them. Councilmembers that attempt to influence commission positions on an item may prejudice or hinder their role in reviewing the commission's recommendation as a member of the City Council.

Individual Councilmembers shall have the right to attend meetings of 934
CC 02-04-2025
934 of 985
4 Cupertino commissions and other Cupertino governmental bodies but shall refrain from speaking or becoming involved in deliberations.

5. Administrative Matters

5.1 Attendance. City Councilmembers acknowledge that attendance at lawful meetings of the City Council is part of their official duty.

Councilmembers shall make a good faith effort to attend all such meetings. Council members shall notify the Mayor or the City Clerk if they will be absent from a meeting.

Council attendance will be noted in the agenda of the next regular meeting and thereafter for that calendar year, if five or more regular meetings are missed.

5.2 Correspondence. Proposed correspondence from the Mayor or other Councilmembers on City stationery should generally be reviewed by the Council in draft form prior to release. On occasion, there are urgent requests from the League of California Cities for correspondence concerning legislation directly affecting municipalities. If the Mayor and the City Manager agree that the League's position corresponds with that of the Council, the Mayor may send a letter without first obtaining Council approval. City letterhead will be made available for routine correspondence (e.g., thank you notes). Official correspondence (including email) from Councilmembers should be respectful and professional.

5.3 Regional Bodies. The Mayor shall appoint Councilmembers to represent the City of Cupertino on regional bodies subject to ratification by the Council at its next regular meeting. The Mayor should endeavor to provide all Councilmembers a fair opportunity to represent the City.

The positions taken by the appointed representatives should be in alignment with the positions that Council has taken on issues that directly impact the City of Cupertino. If an issue arises that is specific to Cupertino and Council has not taken a position, the issue should be discussed by Council prior to taking a formal position at a regional board meeting to assure that it is in alignment with Council's position.

Council representatives to such various boards shall keep the Council informed of ongoing business through brief oral or written reports to the Council. Councilmembers shall make a good faith effort to attend all regional meetings that require a quorum of the appointed members to convene a meeting. Attendance should not be less than 75% of all scheduled meetings. If a Councilmember is unable to attend, they 935
CC 02-04-2025
935 of 985
5 should notify their alternate as far in advance of the meeting as possible so as to allow the alternate to attend.

5.4 Responses toPublic. It will be the responsibility of the City Manager to ensure a response is provided to public correspondence for informational requests addressed to the Council. Staff shall respond to all requests for services as appropriate, and the City Manager shall keep Council informed of the City response.

5.5 Reimbursement. City Councilmembers may be reimbursed for expenses for travel to and lodging at conferences or meetings related to their role as a Councilmember as stated in the Elected Officials' Compensation Program, as may be amended from time to time (Exhibit A). Any additional expenses that fall outside the scope of this policy may be reimbursed only if approved by the City Council, at a public meeting before the expenses are incurred. Any request for reimbursement of expenses shall be accompanied by an expense form and receipts to document the expenditure. These documents are public records subject to disclosure under the California Public Records Act.

Councilmembers shall be eligible to receive City-issued hardware and software for the conduct of official business pursuant to the Council Technology Policy (Exhibit B).

5.6 Council Training. Any member of the City Council and City commissions or advisory committees formed by the City Council shall receive ethics and anti- harassment training required by state law. New members must receive the training within their first year of service and shall comply with ongoing training requirements imposed by state law.

Members shall attend training sessions that are offered locally in the immediate vicinity of Santa Clara County, by completing online a stateapproved public service ethics education program, or through a state - approved training which may be provided at a conference attended by the member. The City Clerk shall keep ethics training records for five years.

5.7 Mayor' s Initiative Budget. The Mayor may use the Mayor' s initiative budget established as part of the City Manager's discretionary fund for projects that the Mayor deems appropriate during the Mayor' s term of office, subject to the requirements of Resolution No. 07-103 (Exhibit C).

The amount of the Mayor' s initiative budget is determined by the City Council.
936
CC 02-04-2025
936 of 985
6 6. Relationship with City Staff

6.1 Incorporation of Municipal Code by Reference. Cupertino Municipal Code Chapter 2.17 (Exhibit D) governs the City Council's relationship with theCity Manager and their staff under the Council-Manager form of government. To the extent that the provisions of Chapter 2.17 are not set below, they are incorporated by reference into this Manual.

6.2 Council/Manager Form of Government. Under the Council/Manager form of government, the City Council sets policy direction as the direct representatives of the community with the City Manager providing the professional expertise to manage the organization and carry out the Council's direction. The City Manager is responsible for carrying out the Council' s policy direction through the day-to-day management of City functions, including the oversight of City operating departments.

Neither individual Councilmembers nor the Council as a whole shall interfere with the City Manager's performance of the administrative duties conferred upon them in Cupertino Municipal Code section

2.28.040.

6.3 Council-Manager Relations. The City Council and its members shall deal with the administrative services of the City only through the City Manager, except for the purpose of inquiry, and neither the City Council nor any Councilmember shall give orders to any subordinates of the City Manager. The City Manager shall take instructions from the City Council only when given at a duly held meeting of the City Council, and no individual Councilmember shall give any instructions to the City Manager.

6.4 Individual Councilmember Influence on Staff Decisions Prohibited. Individual Councilmembers shall not attempt to influence staff decisions, recommendations, workloads, and schedules, and department priorities without prior knowledge and approval of the City Council. If a Councilmember wishes to influence the actions, decisions, recommendations, workloads, work schedules and priorities of staff, that member must prevail upon the City Council to do so as a matter of Council policy.

6.5 Decorum. All Councilmembers and City staff shall treat each other with dignity, courtesy, and respect. In exercising the City Council's policymaking authority, Councilmembers must often critique, modify, or reject a staff recommendation. While thorough vetting and criticism 937
CC 02-04-2025
937 of 985
7 of staff policy recommendations or decisions is a necessary component of Council's policymaking role, criticism should focus on the policy recommendations and decisions and should avoid personal attacks.

Councilmembers shall refrain from publicly criticizing the general abilities, character, or motivations of any staff member and should share any such concerns privately with the City Manager or City Attorney.

6.6 Councilmember Access to Information. City Councilmembers have free access to the flow of any information related to the operation of the City. The City Manager shall ensure that such information is communicated by staff in full and with candor to the Council. City staff will make every effort to respond in a timely and professional manner to all requests made by individual council members for information or assistance, provided that, in the judgment of the City Manager, the request is not of a magnitude either in terms of workload or policy, which would require that it more appropriately be assigned to staff through the collective direction of the City Council, based on the guidelines set forth in Cupertino Municipal Code section 2.17.043.

The City Manager shall place requests that impose a significant workload on staff on the Council agenda for review by the full Council, along with a statement from that Councilmember as to why the information is needed. No Councilmember shall circumvent the City Manager' s direction regarding a request for information by seeking information through a Public Records Act request.

6.7 Authority of City Council. Nothing in this Manual shall limit the City Council's power to accept, reject, amend, or otherwise guide and direct staff actions, decisions, recommendations, workloads and schedules, department priorities, and the conduct of city business through the office of the City Manager. This power cannot be delegated to individual Councilmembers, nor to committees composed of Councilmembers consisting of less than a quorum of the City Council.

7. Agendas and Staff Reports

7.1 Future Agenda Items. The City Manager, the City Attorney, the Mayor, or any two Councilmembers may request that an item be added to a future agenda for Council action. The City Manager shall provide a quarterly report to Council regarding the status of future agenda items, which may include a request to remove items from the list of future 938
CC 02-04-2025
938 of 985
8 agenda items. Any item may be removed for the future agenda items list by a majority vote of the City Council.

7.2 Preparation of Agenda. The City Clerk shall prepare the agenda in consultation with the City Manager, the Mayor, and the City Attorney.

Absent exigent circumstances, an item will be scheduled for Council action no sooner than 14 days after receipt of a request to add the item to the future agenda items list. Any item requiring preparation of a staff report requires City Manager approval or, in case of a report prepared by City Attorney's Office staff, City Attorney approval, before being added to an agenda. The Mayor, in consultation with the City Manager and the City Clerk, shall determine the order of items on the agenda.

7.3 Agenda Item Descriptions. Each agenda item shall include a brief general description of the matter to be discussed ( approximately 20 words in length), including any action that may be taken under the California Environmental Quality Act, and should generally include the recommendation of the City Manager.

7.4 Staff Reports. Staff reports should include the following sections:

1. Subject

2. Recommended Action

2. Reasons for Recommendation

3. Sustainability Impact

4. Fiscal Impact

5. California Environmental Quality Act

7.5 Agenda Publication. Agenda packets for a regular meeting should be published and delivered to Councilmembers no later than the Wednesday prior to a Tuesday Council meeting. Councilmembers are encouraged to contact staff in advance for answers to questions regarding an agenda packet. Written communications addressed to Council shall be forwarded to Council and made available to members of the public, consistent with the requirements of the Brown Act.

7.6 Supplemental Materials. Supplemental reports and materials received by the City Clerk after the agenda is published but before 12:00 p.m. on the Monday prior to the City Council meeting shall be published and delivered to Councilmembers at 5:00 p.m. on Monday. Supplemental reports and materials received by the City Clerk after 12:00 p.m. on Monday but before 4:00 p.m. on the day of the meeting shall be 939
CC 02-04-2025
939 of 985
9 published and delivered to Councilmembers prior to the Council meeting. Council questions and staff-prepared responses will be included in supplemental materials provided to Council and the public.

8. Meeting Procedures

8.1 Meeting Schedule. The City Council conducts its regular meetings on the first and third Tuesdays of the month, except when Council is in recess. At the second regular meeting in January, the City Council will approve the schedule of meetings for the calendar year, which in addition to the regular meeting schedule may include the cancellation of regular meetings and the addition of special meetings and study sessions. This practice does not, however, preclude the Mayor or a majority of the members of the City Council from calling additional meetings pursuant to the Brown Act.

8.2 Rules of Order. City Council meetings shall be governed by Rosenberg' s Rules of Order except as otherwise provided by this Manual. Unless otherwise required by state law or City ordinance, decisions of the Council shall be made by a majority of members present and voting.

The Mayor may impose additional reasonable procedural rules not inconsistent with Rosenberg' s Rules of Order and the provisions of this Manual, unless objected to by a majority of Councilmembers present.

8.3 Order of Business. The order of agenda items for regular Council meetings is as follows:

1. Call to Order

2. Pledge of Allegiance

3. Roll Call

4. Closed Session Report

5. Ceremonial Items

6. Postponements and Orders of the Day

7. Oral Communications (public comment on non-agenda matters)

8. Consent Calendar

9. Public Hearings

10. Action Calendar

11. Items Removed from the Consent Calendar

12. City Manager Report

13. Oral Communications (continued)

14. Councilmember Reports

15. Future Agenda Items
940
CC 02-04-2025
940 of 985
10 16. Adjournment
Oral communications shall be limited to 30 minutes. Additional speakers wishing to comment on non-agenda items may be given time to speak at the end of the agenda, after the City Manager's report.

Councilmember Reports should focus on Council committee assignments and ceremonial appearances. In the absence of an objection made by a majority of Councilmembers present and voting, the Mayor may modify the order of business to facilitate the fair and efficient conduct of Council meetings.

8.4 Consent Calendar.

8.4.1 Adding Item to Consent Calendar. The Mayor, the City Manager, the City Attorney, or the City Clerk may recommend that items appearing on the agenda be placed on the consent calendar for action by the City Council. All items placed on the consent calendar shall appear together on the agenda with the recommendation as to the action to be taken by the City Council with respect to such item. Upon the motion of any member of the City Council, all items placed upon the consent calendar may be acted upon together, and each shall be deemed to have received the action recommended.

8.4.2 Removing Item from Consent Calendar. Items may be removed from the consent calendar only by a member of the City
Council. Any member of the City Council who would like to remove any item from the consent calendar shall notify the City Manager and the City Clerk no later than 12:00 p.m. on the day of the City Council meeting. Arequest to remove a consent calendar item shall be made in writing and shall state the reason for removing the item fromthe consent calendar. Items may be removed from the consent calendar after 12:00 p.m. onthedayoftheCityCouncil meeting only bya majority vote of the Council. Items removed from the consent calendar shall be placed on the agenda for consideration after the action calendar.

8.5 Public Comment. An opportunity for public comment shall be provided for the consent calendar, each other agenda item under consideration, and, during regular meetings, on any matter that is within the subject matter jurisdiction of the City Council. The Mayor may consolidate public comment for related agenda items, subject to overruling by a 941
CC 02-04-2025
941 of 985
11 majority vote of the Council. Non- agenda matters ( including Council and staff reports) may be addressed by the public during oral communications. Members of the public wishing to speak regarding an item shall submit a request to comment to the Clerk (" blue card") or, where applicable, raise their hand in Zoom within nine minutes of the time the Mayor opens public comment or prior to the close of public comment on the item, whichever is earlier. Each individual speaker will ordinarily have up to three minutes to address the Council. If a speaker representing five or more members of the public in attendance and wishing to comment on the item but electing not to speak, the speaker may have up to 10 minutes to address the Council. Consolidation of time among speakers is not otherwise allowed. If a large number of speakers wish to address Council on an item, the Mayor may reduce the time allotted to each speaker consistent with the Brown Act. Twice the speaking time will be provided to any member of the public who uses a translator.

8.6 Communications with Members of the Public. The City Council may ask questions of speakers providing public comment but should avoid an extended discussion with members of the public during meetings.

Additionally, when a member of the public provides comments regarding a matter that is not on the agenda, Councilmembers may ( 1) refer the speaker to staff; (2) refer the speaker to appropriate reference material; ( 3) request that staff report back at a future meeting; or ( 4) request that staff place the item on a future agenda.

Councilmembers should not otherwise respond to or comment on an item of business that is not on the agenda. City staff should generally avoid responding to comments or questions from members of the public during Council meetings, although the City Manager or City Attorney may offer to arrange a time to discuss the subject matter of public comments with members of the public subsequent to the Council meeting.

8.7 Conduct of Meetings

8.7.1 Councilmembers. Members of the City Council value and recognize the importance of the trust invested in them by the public to accomplish the business of the City. Councilmembers shall accord courtesy to each other, to City employees, and to members of the public appearing before the City Council. 942
CC 02-04-2025
942 of 985
12 8.7.2 City Employees. City staff shall observe the same rules of decorum applicable to the City Council. City staff shall act at all times in a businesslike and professional manner
towards Councilmembers and members of the public.

8.7.3 Members of the Public. Members of the public attending City Council meetings are encouraged to treat Councilmembers, City staff, and other members of the public with the same courtesy that Councilmembers and City staff must accord to them. Any members of the public who engages in conduct that disrupts a City Council meeting shall be removed from the meeting.

Nothing in this Manual or any rules of conduct that may be adopted by the City Council shall be construed to prohibit public criticism of the policies, procedures, programs, or services of the City, or of the acts or omissions of the City Council, City advisory bodies, or City staff.

8.8 Discussion and Deliberation

8.8.1 Ex Parte Contacts. Councilmembers shall disclose any ex parte communications prior to deliberation on a quasi-judicial matter.

A quasi- judicial matter is typically a hearing in which the City Council hears evidence and makes findings of fact to reach a conclusion based on the applicable law. An ex parte
communication occurs when a Councilmember hearing a quasijudicial matter communicates directly or indirectly with any person or party in connection with a matter before the Council, without notice and the opportunity for all parties to participate.

8.8.2 Relevance. All discussion must be relevant to the issue before the City Council. A Councilmember is given the floor only for the purpose of discussing the pending matter; discussion which departs from the item agendized for discussion is out of order. Councilmembers should avoid repetition and shall not discuss matters that are not on the agenda. Arguments for or against a measure should be stated as concisely as possible.

8.8.3 Council Questions and Deliberations. Councilmembers may obtain the floor by seeking recognition from the Mayor.

Following presentations to Council on an agenda item,
Councilmembers shall each be given five minutes to ask
questions of any presenter. The Mayor may allow additional 943
CC 02-04-2025
943 of 985
13 time for questions where appropriate. Following public comment, the Mayor may request that a motion be made and seconded. After the motion has been stated to the Council and seconded, any member of the Council has a right to discuss the motion after obtaining the floor. A member who has been recognized shall limit their time to five minutes, but may reserve any portion of their time for further questions or deliberations, as applicable, by advising the Mayor before yielding the floor. The Mayor may allow additional time for deliberations where appropriate. This rule shall displace any conflicting rule in the City's adopted rules of procedure.

8.8.4 Opportunity for Equal Participation. It is the policy of the Council to encourage the full, fair participation of all members of the Council in discussions and deliberations. The Mayor may impose reasonable limits on the time any Councilmember is permitted to speak to advance this policy. In addition, all Councilmembers wishing to be recognized should be given an opportunity to speak before any member is allowed to speak a second time.

8.8.5 Civility. While it is appropriate to vigorously debate a motion, its nature, or its consequences, Councilmembers shall avoid attacks on the motives, character, or personality of other Councilmembers, City staff, and members of the public. The Mayor shall rule out of order any Councilmember who engages in such attacks.

8.8.6 Role of the Mayor. The Mayor has the responsibility for controlling and expediting the discussion of an agenda item. It is the duty of the Mayor to keep the subject clearly before the Councilmembers, to rule out irrelevant discussion, and to ensure civil discussion among Councilmembers.

8.9 Meeting Length. Meetings of the City Council shall adjourn by 11:00 p.m. unless the time of adjournment is extended by a vote of a majority of the City Council. Discussion of an agenda item shall not begin after 10:30 p.m. Any motion to extend the meeting beyond 11:00 p.m. shall include a list of specific agenda items to be discussed or approved and shall specify the order these items shall be considered. If a meeting continues past 11:00 p.m., it shall end at 11:30 p.m. All meetings shall be adjourned at 11:30 p.m. unless by a vote of a majority of the City Council suspends this rule and Council votes affirmatively to extend 944
CC 02-04-2025
944 of 985
15 reserved to the Council by law. This authority extends throughout the period of recess established by the City Council and includes the authority to execute agreements and make expenditures necessary for the exigent operational matters. The City Manager shall make a full and complete report to the City Council at its first regularly scheduled meeting following the period of recess of actions taken by the City Manager pursuant to this section, at which time the City Council may make such findings as may be required to ratify the actions of the City Manager. Nothing in this Section prevents the City Council from calling a special meeting during the recess period.

9. Closed Sessions
A closed session may be held at any regular or special meeting for any purpose authorized by the Brown Act. The City Attorney will schedule closed session meetings in consultation with the Mayor and the City Manager. Public comment shall be received in open session prior to a closed session. To ensure strict compliance with the Brown Act, the City Attorney or the City Attorney's designee shall report out in public session any reportable action taken during closed session and any other information from closed session authorized to be disclosed based on a majority vote of the City Council.

10. Enforcement of Rules; Suspension of Rules
The City Council may enforce repeated or serious violations of the rules set forth in this Manual through a censure action placed on a Council agenda.

Nothing in this Manual shall be cited to invalidate a properly noticed and acted upon action of the City Council. Any rule set forth in this Manual may be suspended by a three votes of the Council.
945
CC 02-04-2025
945 of 985

EXHIBIT A
946
CC 02-04-2025
946 of 985
1 EXHIBIT A
City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 1

PROGRAM PURPOSE AND DEFINITIONS FOR ELIGIBILITY
It is City of Cupertino policy that those certain persons holding positions hereinafter defined and designated as elected official positions shall be eligible for participation under the Elected Officials Compensation Program as hereby adopted by action of the City Council and as same may be amended or as otherwise modified from time to time.

Eligibility for inclusion with this Compensation program is limited to persons holding positions as elected officials. These are designated by the voters and may be modified as circumstances warrant.

The position in the following classification has been designated as elected official.

ELECTED OFFICIAL CLASSIFICATIONS:

Classification Title City
Council Member
Adopted by Action of the City Council,
July 2013
947
CC 02-04-2025
947 of 985
2 City of Cupertino

ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 2

SALARY SCHEDULE
As rates of pay are set forth under the Cupertino Municipal Code 2.16.020, and hereby adopted by action of the City Council, so are those rates of pay included herein as a part of this Compensation program. The inclusion herein of said rates and schedules does not affect any effective dates or otherwise reflect on the approval processes required but is shown as an integral part of this Program for completeness of record.

Adopted by Action of the City Council
July, 2013, October 2016
948
CC 02-04-2025
948 of 985
3 City of Cupertino

ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 3

TRAINING AND CONFERENCES
I. POLICY
It is City of Cupertino policy that members of the City Council and the Council’ s commissions and committees, shall be reimbursed or receive a direct advance according to the schedules, terms and conditions as set forth herein for the expenses authorized below. This policy is established in accordance with California Government Code Sections 53232. 2 and 53232. 3.

III. AUTHORIZED EXPENSES
The City Council and their commission and committee members can receive reimbursements or advances toward actual and necessary expenses incurred by participating in the following activities or events:

1. Communicating with representatives of regional, state and national government on City adopted policy positions;

2. Attending seminars, conferences, and training to improve skill and information levels;

3. Participating in regional, state and national organizations whose activities affect the City’ s interests ( such as the League of California Cities);

4. Attending International Conferences, budget limited to $ 2,500 per fiscal year, provided there is a benefit to the City;

5. Attending City events;

1. Attending functions of other local civic or community organizations where there is a clear nexus between the event and the member’ s attendance as an official representative of the City. Purely social events, service club dues and meals, and political or charitable contributions or events would be excluded. For purposes of this section, reimbursable fundraisers and events include, but are not limited to, Cupertino Union School District, Fremont Union High School District, Foothill De Anza Community College District, Silicon Valley Leadership Group, Cupertino American Cancer Society ( ACS) Relay for Life and Cupertino Chamber of Commerce activities.
949
CC 02-04-2025
949 of 985
4 The City will not reimburse or advance payment toward expenses including, but not limited to:

1. The personal portion of any trip;

2. Family expenses, including those of a partner when accompanying Council or commission member on City related business, as well as child or pet related expenses.

3. Entertainment expenses, including theatre, shows, movies, sporting events, golf, spa treatments, etc.

4. Meals and entertainment paid on behalf of third parties outside of the City;

5. Gifts of any kind for any purpose;

6. Alcoholic beverages;

7. Non mileage personal automobile expenses including repairs, insurance, gasoline, traffic citations; and

8. Personal losses incurred while on City business.

IV. BUDGETARY LIMITATIONS
Reimbursement or advancement of expenses shall not exceed budgetary limitations.

Changes in appropriations will be done through the budget process.

V. REIMBURSEMENT AND ADVANCE SCHEDULE
A. Intent
This schedule is written with the intent that the City Councilmember, commissioner, or committee member will make every effort to find the lowest possible cost to the City for traveling on City business. For example, if paying for parking at the airport is less expensive than paying for a taxi or airport shuttle, then officials should drive their car and park at the airport; or if renting a car is lower than taking taxis at the out of town location, then a car should be rented. Air reservations should be booked in advance to obtain discounted fares. The following procedures apply whether the expense is being paid through a reimbursement or a direct advance.
950
CC 02-04-2025
950 of 985
5 B. Local Area
The local area is defined to be within Santa Clara and San Mateo Counties and within a 40 mile distance from Cupertino when traveling to Alameda County.

C. Registration
The City will pay the registration fee for authorized attendance at a convention, conference, seminar or meeting.

D. Transportation
The City will pay transportation costs on the basis of the lowest cost intent stated in paragraph A. Eligible transportation costs include airfare ( with coach fare being the maximum), van or taxi service to and from the attendee’ s home and airport, destination or airport parking charges, taxi and shuttle services at the out of town location, trains, tolls, or rental cars. Use of a personal automobile for City business shall be reimbursed or advanced at the rate per mile in effect for such use, except in no case shall it exceed air coach fare if the vehicle is being used for getting to the destination. Government or group rates offered by a provider of transportation must be used when available.

E. Lodging
Hotel or lodging expenses of the City official resulting from the authorized event or activity defined in this policy will be reimbursed or advanced if the lodging and event occur outside the local area. Not covered will be lodging expenses related to person( s) who are accompanying the City member, but who themselves are not on City business.

In this instance, for example, the difference between single and multiple occupancy rates for a room will not be reimbursed.

Where the lodging is in connection with a conference or other organized educational activity, City paid lodging costs shall not exceed the maximum group rate published by the conference or activity sponsor, providing that lodging at the group rate is available at the time of booking. If the group rate at the conference hotel is not available, then the non conference lodging policy described in the next paragraph should be followed to find another comparable hotel.

Where lodging is necessary for an activity that is not related to a conference or other organized educational activity, reimbursement or advances shall be limited to the actual cost of the room at a group or government rate. In the event that a group or government 951
CC 02-04-2025
951 of 985
6 rate is not available, lodging rates that do not exceed the median price for lodging for that area and time period listed on travel websites like www. hotels. com, www. expedia. com or an equivalent service shall be eligible for reimbursement or advancement.

F. Meals

1. No Conference
The actual cost of a meal can be claimed, within a standard of reasonableness, but receipts must be kept and submitted for the expense incurred.

2. As Part of a Conference
When City officials are attending a conference or other organized educational activity, they shall be reimbursed or advanced for meals not provided by the activity, on an actual cost basis. The actual cost rate shall follow the rules described in the meals with no conference paragraph.

G. Other Expenses
Payments toward or reimbursement of other expenses related to authorized activities or events shall be limited to the actual costs consistent with the application of reasonable standards. Receipts must be kept and submitted for all expenses.

VI. DIRECT CASH ADVANCE POLICY
From time to time, it may be necessary for a City official to request a direct cash advance to cover anticipated expenses while traveling or doing business on the City’ s behalf. Such request for an advance should be submitted to the City Manager or Department Head no less than seven days prior to the need for the advance with the following information: 1) Purpose of the expenditure; 2) The anticipated amount of the expenditure ( for example, hotel rates, meal costs, and transportation expenses); and 3) The dates of the expenditure.

An accounting of expenses and return of any unused advance must be reported to the City within 30 calendar days of the official’ s return on the expense report described in Section VII.
952
CC 02-04-2025
952 of 985
7 VII. EXPENSE REPORT REQUIREMENTS
All expense reimbursement requests or final accounting of advances received must be approved by the City Manager or Department Head, on forms determined by the Finance Department, within 30 calendar days of an expense incurred, accompanied by a business purpose for all expenditures and a receipt for each item other than mileage. The report will be a public record subject to disclosure under the Public Records Act.

VIII. REPORTS TO CITY COUNCIL OR COMMISSIONS
At the next regular City Council or commission meeting, each councilmember or commissioner shall briefly report on publicly noticed meetings attended at City expense.

If multiple members attended the meeting, a joint report may be made.

IX. POLICY VIOLATIONS
Violations of this policy including falsifying expense reports may result in any or all of the following: ( 1) loss of reimbursement privileges, ( 2) demand for restitution to the City, 3) civil penalties of up to $1,000 per day and three times the value of the resources used, and 4) prosecution for misuse of public resources.

Revised 7/ 83, 7/ 85, 7/ 87, 7/ 88, 7/ 91, 7/ 92, 12/ 07, 7/ 10 953
CC 02-04-2025
953 of 985
8 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 4

MILEAGE REIMBURSEMENTS
It is City of Cupertino policy that eligible persons under this Compensation Program shall be compensated fairly for the use of personal automotive vehicles on City business. Those persons who occasionally are required to use their personal automobiles for City business shall be reimbursed for such use at the established IRS rates. Submission of reimbursement requests must be approved by the City Manager.

Adopted by Action of the City Council
July, 2013
954
CC 02-04-2025
954 of 985
9 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 5

ASSOCIATION MEMBERSHIPS AND

PROFESSIONAL PUBLICATIONS
It is City of Cupertino policy that eligible persons under this Compensation Program shall be entitled to City sponsored association memberships as well as receiving subscriptions to professional and technical publications. Such sponsorship, however, shall be conditioned upon the several factors as set forth below.

Each association for which membership is claimed must be directly related to the field of endeavor of the person to be benefited. Each claim for City sponsored membership shall be submitted with their concurrence to the City Manager for approval.

Subscriptions to or purchase of professional and technical publications may be provided at City expense when such have been authorized by the City Manager providing the subject matter and material generally contained therein are related to municipal governmental operations.

Adopted by Action of the City Council
July, 2013
955
CC 02-04-2025
955 of 985
10 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION

PROGRAM
Policy No. 7

HEALTH BENEFITS PLAN CITY

CONTRIBUTION
It is the policy of the City of Cupertino to provide group hospital and medical insurance under which the elected official positions and their dependents may be covered. The purpose of this program is to promote and preserve the health of employees and their families through comprehensive health plans available only through employer sponsorship.

Although the premium cost for the insurance provided remains the ultimate responsibility of the employee in these positions, the City shall contribute the amounts listed below towards the premium or pay the full cost of the premium if less than the stated amounts. If the premium amounts for any employee covered by this policy are less than the amounts listed below per month, the difference between the premium amount and the stated amounts will be retained by the City.

Effective
January 1, 2020
City Max Health
Contribution
City Max * Dental
Contribution
City Total Max
Contribution
Employee 848. 87 126. 78 975. 65
Employee + 1 1,443. 09 126. 78 1,569. 87
Employee + 2 1,876. 01 126. 78 2,002. 79
January 1, 2021 City Max Health
Contribution
City Max * Dental
Contribution
City Total Max
Contribution
Employee 891. 32 126. 78 1,018. 10
Employee + 1 1,515. 24 126. 78 1,642. 02
Employee + 2 1,969. 81 126. 78 2,096. 59
January 1, 2022 City Max Health
Contribution
City Max * Dental
Contribution
City Total Max
Contribution
Employee 935. 88 126. 78 1,062. 66
Employee + 1 1,591. 01 126. 78 1,717. 79
Employee + 2 2,068. 31 126. 78 2,195. 09
956
CC 02-04-2025
956 of 985
11 Dental Coverage: Effective the first month after Council adoption of MOU, dental coverage is capped at $2,500.00 per dependent per annual plan year for the term of this contract.

Adopted by Action of the City Council
July, 2013, October 2016, July 2019,
December 2019, January, 2023
957
CC 02-04-2025
957 of 985
12 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 9

LIFE INSURANCE
It is the policy of the City of Cupertino to provide life insurance benefits to the elected officials to a maximum of $16, 000.

The elected officials may enroll in the life insurance program offered if eligible under the contract provisions of the policy and the personnel rules of the City. The full cost of premiums for these programs shall be paid by the City for such individuals.

Adopted by Action of the City Council
July, 2013
958
CC 02-04-2025
958 of 985
13 City of Cupertino

ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 10

DEFERRED COMPENSATION
It is the policy of the City of Cupertino to provide equitable current compensation and reasonable retirement security for the elected officials for services performed for the City. The City participates in the California Public Employees’ Retirement System ( PERS) and deferred compensation plans have been established. Both the elected official and City may make contributions from current earnings to these plans. The purpose of this policy is to promote means by which compensation may be provided in such manner and form to best meet the requirements of the City and the needs of the elected officials. .

The City shall maintain and administer means by which the elected officials in these positions may defer portions of their current earnings for future utilization. Usage of such plans shall be subject to such agreements, rules and procedures as are necessary to properly administer each plan. Individual contributions to such plans may be made in such amounts as felt proper and necessary to the elected official. The City contributions shall be as determined by the City Council.

Adopted by Action of the City Council
July, 2013
959
CC 02-04-2025
959 of 985
14 City of Cupertino

ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 11
PUBLIC EMPLOYEES’ RETIREMENT SYSTEM CONTRIBUTION
A. Council Members occupying office on or before December 29, 2012 Only:

For Council Members occupying office on or before December 29, 2012, the City has contracted with CalPERS for a 2.7% @55 retirement formula.

Effective in the first full pay period in July 2017, each employee shall pay the full 8.0% of applicable salary of the employee’ s contribution towards CalPERS.

B. Council Members occupying office on December 30, 2012 or December 31, 2012 or a current CalPERS employee who qualifies as a classic member under CalPERS Regulations Only.

For Council Members hired on December 30, 2012 or December 31, 2012 or a current CalPERS employee who qualifies as a classic member under CalPERS Regulations only the City has contracted with CalPERS for a 2.0% @ 60 retirement formula, three year average compensation
Effective January 1, 2017, the City shall not pay the employee’ s contribution rate to the California Public Employees Retirement System ( CalPERS) and each employee shall pay the full 7% of applicable salary of the employee’ s contribution towards CalPERS.

C. For Council members occupying office on of after January 1, 2013, or former CalPERS employees that do not qualify as Classic employees hired by the City of Cupertino on or after January 1, 2013
For Council Members occupying office on or after January 1, 2013 CalPERS has by statute implemented a 2% @ 62 formula, three year average and employees in this category shall pay 50% of the normal cost rate as determined by CalPERS.

Adopted by Action of the City Council
July, 2013, October 2016, July 2019
960
CC 02-04-2025
960 of 985
15 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 12

DENTAL INSURANCE CITY CONTRIBUTION
It is the policy of the City of Cupertino to provide dental insurance under which the elected official positions and their dependents may be covered.

The premium cost for the insurance provided by the City shall not exceed $ 126. 78* per month per individual. Enrollment in the plan or plans made available pursuant to this policy shall be in accordance with Personnel Rules of the City and the provisions of the contract for such insurance between the City and carrier or carriers.

Dental Coverage: Effective the first month after Council adoption of agreement, dental coverage is capped at $2,500. 00 per dependent per annual plan year for the term of this contract.

Adopted by Action of City Council
July, 2013, October 2016, July 2019
961
CC 02-04-2025
961 of 985
16 City of Cupertino

ELECTED OFFICIALS COMPENSATION PROGRAM
Policy No. 14

EMPLOYEE ASSISTANCE PROGRAM
It is the policy of the City of Cupertino to provide an Employee Assistance Program for the benefit of the elected officials and their eligible dependents. The purpose of this program is to provide professional assistance and counseling concerning financial, legal, pre retirement, and other matters of a personal nature.

Adopted by Action of the City Council
July, 2013
962
CC 02-04-2025
962 of 985
17 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 17
VISION INSURANCE – CITY CONTRIBUTION
It is the policy of the City of Cupertino to provide vision insurance under which employees and their dependents may be covered.

The premium cost for the insurance provided by the City shall not exceed $ 14. 94 per month per employee. Enrollment in the plan or plans made available pursuant to this policy shall be in accordance with the provisions of the contract between the City and carrier or carriers providing vision insurance coverage, Adopted by Action of the City Council
July, 2013
963
CC 02-04-2025
963 of 985
18 City of Cupertino
ELECTED OFFICIALS’ COMPENSATION PROGRAM
Policy No. 18

TECHNOLOGY POLICY
Purpose
This policy establishes guidelines and standards regarding the provision of technology hardware and software for Councilmembers.

Scope and Applicability
This policy applies to all City Councilmembers for the provision and maintenance of City issued technology hardware and software This technology is in addition to City technology equipment and software residing within the Mayor' s and Council' s office at City Hall.

Technology Provision
To facilitate communications with citizens, staff and other Councilmembers, each Councilmember may elect to be issued the following technology hardware at the beginning of each term.
1 Laptop
1 Docking Station
1 Monitor
1 Webcam
1 Keyboard & Mouse
1 Phone with Voice/ Data Plan
Each Councilmember’ s issued laptop will have the following additional software applications:

Office productivity platform, e.g., Microsoft O365
Cybersecurity Tools, e.g.., end point protection and multifactor authentication Video Conferencing, e.g., Zoom
964
CC 02-04-2025
964 of 985
19 Each Councilmember’ s issued phone will have the following additional software applications
Office productivity platform
Cybersecurity Tools
Video Conferencing
Issued technology hardware and software will meet current City hardware and software standards to ensure proper security, maintenance, and support.

Councilmembers who wish to not use City issued equipment must provide written acknowledgement that the technology they will use has current antivirus software and all software applications are up to date from a cyber security standpoint.

Councilmembers use the issued equipment for the performance of official City business. Data contained within the equipment is public property and considered a public record, therefore subject to all Public Records Act and Brown Act policies.

Councilmembers, upon completion of their term, will return all issued equipment to the Innovation & Technology Department. City equipment and/ or software is not available for purchase.

City Support
Innovation & Technology staff are solely responsible to provide technical support and maintenance for issued equipment and may be reached at helpdesk@cupertino. org or 408) 777 3381. If required, Councilmembers shall bring their equipment to City Hall for repair and/ or service.

Adopted by Action of the City Council
July, 2019, January, 2023
965
CC 02-04-2025
965 of 985
20 City of Cupertino
City Council
and
Planning Commission
Compensation
Effective January 1, 2017
966
CC 02-04-2025
966 of 985
21 CITY OF CUPERTINO CITY COUNCIL

AND PLANNING COMMISSION
EFFECTIVE January 1, 2017
The salaries, wages or rates of pay for members of the City Council and Planning Commission are set forth below. Only the City Council can modify these rates.

Members of the City Council $ 737. 54/ month
Members of the Planning Commission* $ 50. 00/ meeting ( maximum $ 200 monthly) Effective first full pay period in July 2017
Members of the City Council $ 743. 07/ month
Members of the Planning Commission* $ 50. 00/ meeting ( maximum $ 200 monthly) Benefits as set forth in this document do not apply to members of the Planning Commission.
967
CC 02-04-2025
967 of 985
Council
Technology
Policy
Citywide Policy Manual
Policy #
Attachments:

N/A
Effective Date:

December 12, 2022
Responsible Department:

Innovation & Technology
Related Policies & Notes:

This policy supersedes previous Council Technology Polices from 2005, 2012, and 2018 Purpose
This policy establishes guidelines and standards regarding the provision of technology hardware and software for Councilmembers.

Scope and Applicability
This policy applies to all City Councilmembers for the provision and maintenance of City issued technology hardware and software This technology is in addition to City technology equipment and software residing within the Mayor's and Council' s office at City Hall.

Technology Provision
To facilitate communications with citizens, staff and other Councilmembers, each Councilmember may elect to be issued the following technology hardware at the beginning of each term.
1 Laptop
1 Docking Station
1 Monitor
1 Webcam
1 Keyboard & Mouse
1 Phone with Voice/Data Plan
Each Councilmember’ s issued laptop will have the following additional software applications:

Office productivity platform, e.g., Microsoft O365
Cybersecurity Tools, e.g.., end point protection and multifactor authentication Video Conferencing, e.g., Zoom

EXHIBIT B
968
CC 02-04-2025
968 of 985
Each Councilmember’ s issued phone will have the following additional software applications
Office productivity platform
Cybersecurity Tools
Video Conferencing
Issued technology hardware and software will meet current City hardware and software standards to ensure proper security, maintenance, and support.

Councilmembers who wish to not use City issued equipment must provide written acknowledgement that the technology they will use has current antivirus software and all software applications are up to date from a cyber security standpoint.

Councilmembers use the issued equipment for the performance of official City business.

Data contained within the equipment is public property and considered a public record, therefore subject to all Public Records Act and Brown Act policies.

Councilmembers, upon completion of their term, will return all issued equipment to the Innovation & Technology Department. City equipment and/ or software is not available for purchase.

City Support
Innovation & Technology staff are solely responsible to provide technical support and maintenance for issued equipment and may be reached at helpdesk@cupertino. org or (408) 777- 3381. If required, Councilmembers shall bring their equipment to City Hall for repair and/ or service.

Submitted By: Approved By:

Printed Name: Bill Mitchell Printed Name: Pamela Wu
Title: CTO Title: City Manager
Signature: Signature:

Date: December 11, 2022 Date:
969
CC 02-04-2025
969 of 985
Vote
AYES:

NOES:

ABSENT:

ABSTAIN:

ATTEST:
ls/ Kimberly Smith
City Clerk
Members of the City Council
Wang, Kwok, Lowenthal, Mahoney, Sandoval
None
None
None
APPROVED:
ls/Kris Wang
Mayor, City of Cupertino

EXHIBIT C
RESOLUTION NO. 07- 103

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO

PROVIDING FOR A DISCRETIONARY FUND TO BE ADMINISTERED BY THE CITY MANAGER TO PROVIDE A ll?UNDING SOURCE FOR PROJECTS

THAT THE MAYOR MAY WISH TO PROPOSE FROM TIME TO TIME
DURING THE MAYOR' S TERM OF. OFFICE
WHEREAS, The City Council wishes to provide a small source of funds for projects that may be proposed at the discretion of the Mayor during the Mayor' s term of office; and,
WHEREAS, The City Council wishes to establish a Mayor' s initiative budget that will be included as part of the City Manager' s Office budget in the City Manager' s discretionary account; and,
WHEREAS, The City Council wishes to determine, as part of the budget process, the amount of funding for the duration of the Mayoral term; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Cupertino that Mayor' s initiative budget is established in an amount to be determined by the City Council as part of the City Manager' s discretionary fund to be used for projects that the Mayor deems appropriate during the Mayor' s term of office; and, BE IT FURTHER RESOLVED that the decision to spend money on a Mayor' s project will be jointly determined by the Mayor and the City Manager, except that the City Manager may, at his or her sole discretion escalate the spending decision to the City Council if he or she determines that to be necessary or appropriate; and, BE IT FURTHER RESOLVED that the City Council will be advised by an item on the Council Agenda prior to the date of the Mayor' s State of the City Address, of any new project or initiative that the Mayor may wish to propose during the State of the City Address.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 5th day of June 2007, by the following vote:
970
CC 02-04-2025
970 of 985
0( 1' 2
3 4
5 4
4 6
0( 1' 2
7 0( 1' 2
0( 1' 2
0( 1' 2
D
971
CC 02-04-2025
971 of 985
0 2
0( 1' 2
0( 1' 2
7 0( 1' 2
7 7 3
8 5 9 9 8
6 0+
28 0( 1' 2
972
CC 02-04-2025
972 of 985
14 the meeting past 11:30 p.m. Following the adjournment of the meeting, any remaining items on the agenda shall be continued to the next regular meeting of the City Council.

8.10 Public Hearing Procedures. The order of proceeding where there is a public hearing item (non-appeal items) before the City Council shall be as follows:

1. Open Public Hearing

2. Staff Report (preferably 10 minutes)

3. Applicant's presentation (where applicable) (preferably:-:::; 8 minutes)

4. Questions from the Council

5. Public comment

6. Applicant' s response to public comment ( where applicable) preferably 2 minutes)

7. Close Public Hearing

8. City Council discussion and vote
Where the public hearing involves an appeal of a decision to the City Council, the order of proceeding shall be as follows:

1. Open Public Hearing

2. Staff Report ( preferably 10 minutes)

3. Appellant's statement (preferably 8 minutes)

4. Applicant' s statement ( where applicable) ( preferably 8 minutes)

5. Questions from the Council

6. Public comment

7. Applicant's response to public comment ( where applicable) preferably 2 minutes)

8. Appellant's response to public comment (preferably 2 minutes)

9. Close Public Hearing

10. City Council discussion and vote

8.11 City Council Recess Period. The City Council recess period shall begin the first Tuesday in August at 12:00 a.m. and end the Tuesday following Labor Day at 12:00 a.m. During any recess period, the City Manager is authorized to take such ministerial actions for matters of operational urgency, including such emergency actions as are necessary for the immediate preservation of the
public peace, health, or safety, as would normally be taken by the City Council during the period of recess, except for those duties specifically 973
CC 02-04-2025
973 of 985

CITY OF CUPERTINO
Agenda Item
24-13564 Agenda Date: 2/4/2025
Agenda #: 13.

Subject: Councilmember Reports
CITY OF CUPERTINO Page 1 of 1 Printed on 1/28/2025
powered by Legistar™974
CC 02-04-2025
974 of 985
1 CITY COUNCILMEMBER REPORT
Meeting: Tuesday, February 4, 2025
Reporting Councilmember: Mayor Liang Chao
Report Dates: 1/15/25 to 1/27/25
Section 1: Announcement - Message from the Mayor:
❖ Messages from other agencies: I continue to forward questions on other agencies to address your concerns.
➢ Message from the Fire Department: Response regarding fire safety questions from residents
■ They have prepared an FAQ to answer many questions they have received. ■ To learn more about preparing your home and family to survive wildfire, visit sccfd.org/rsg.
➢ Message from the Santa Clara Valley Water District: Response regarding concerns on the water level of the Stevens Creek Reservoir
■ “Valley Water does own and operate 10 reservoirs throughout Santa Clara County, and we partner with fire protection agencies and local water retailers (such as San Jose Water Company) to supply water that may be used for fire protection purposes.” ■ “In fact, Stevens Creek Reservoir is currently 62% full—equivalent to a volume of 1,900 acre-feet of water. Rest assured, though, that this is more than enough water needed for an emergency situation.”
❖ Monthly Mayor’s Coffee Community Meetings: These meetings will be generally held on the second Monday at 5pm each month, but it might be moved to other Mondays if needed. The location will rotate so that we cover different businesses each month. ➢ The first Monthly Mayor’s Coffee was held on Monday January 20 at 5pm at Holder’s Country Inn. ➢ The next Mayor’s Coffee will be on Monday February 10th at 5pm. The location is TBD. ❖ The State of the City Address: It will be held in the evening of Wednesday February 26. ➢ A message to save the date has been sent out.
➢ Partners: We continue to partner with Cupertino Rotary and Cupertino Chamber. In addition, we are also partnering with the Cupertino Library Foundation and the Cupertino Historic Society. We welcome more outreach partners to help support the event. ❖ Proclamations at Council meetings: This year, I plan to follow a tradition upheld by some former Cupertino mayors and other mayors in recognizing organizations or individuals with proclamations during Council meetings. My goal is to honor those who have made consistent 975
CC 02-04-2025
975 of 985
City Council Councilmember Report
2 and/or significant contributions to Cupertino, with an emphasis on those who are less wellknown. If you have any suggestions, please feel free to email me at [email protected].

Proclamations for contributions will generally be presented at the second Council meeting of each month, while the first meeting will continue to recognize special observances (e.g., awareness months or weeks) as before. You are also welcome to submit suggestions for these recognitions. ❖ Cupertino Mayor at the Chamber LAC Meeting: On Friday February 7th, I will speak at the Legislative Action Committee (LAC) of the Cupertino Chamber. Their website states “Meetings are typically (but not always) held at 12:30pm until 2pm, the first Friday of each month. The meeting is open to the public. R.S.V.P. preferred.”
I am happy to attend meetings at other organizations too. You are welcome to submit your invitations to [email protected].
❖ FY 2025-27 Work Program Prioritization: The staff has proposed a new process for Work Program Prioritization in an info memo. Check the Work Program page for updates. ➢ The Council has reviewed the initial top-10 lists at the 1/22 council meeting. Each councilmember will submit their revised top-10 list and then provide a ranking on 20 projects. See an upcoming info memo for the revised lists. ➢ At the March 3 Council Workshop, the Council will rank the projects and the top 20 will be considered for the FY 2025-27.
➢ The final decision will likely be made in April/May before the Council adopts the FY 25-26 budget in June 2025.

Section 2: Activities by Date (Date, Title, and Description):

NOTE:
● This list does not include internal meetings with staff only, such as prep sessions or meetings with the City Manager.
● This list includes activities to “represent the community I am elected to serve”, “to respond to community needs and complaints,” and “to communicate policies and programs to residents,” among other responsibilities of a City Councilmember.
● Due to my work schedule, I have cut down on the event attendance for ceremonial purposes, especially those I have attended almost every year in the past. Instead, I focus more of my time on constituent services.
2025-1-16 Cupertino Chamber of Commerce Installation Ceremony at Quinlan Center - The 2024 President John Tang made his remark and then the 2025 President and the Board took over. Met many Chamber board members.
2025-01-17 meeting with Jennifer Zhou, Bay Area Council - Jennifer Zhou is the Vice President of Global Initiatives for Bay Area Council. She has offices in Shanghai and the Bay Area.
976
CC 02-04-2025
976 of 985
City Council Councilmember Report
3 - They provide free services to help the U.S. companies to set up branches in China and also help companies from China to set up branches in the U.S.
2025-01-29 Attended the annual gala of the Shin Shin Educational Foundation and the lunar new year celebration
- Presented the proclamation to declare January 19, 2025 the Shin Shin Foundation Day, to follow the tradition in previous years.
- There were exciting performances for the new year, including lion dance and face-changing and other dance and music performances by performers of all ages. 2025-01-30 The first Mayor’s Coffee at the Holder’s Country Inn - About 15 people attended.
- They brought up various issues such as community grant program, budget issue, art center like Palo Alto, transparency for development projects, fire safety for Eucalyptus trees in neighboring HOA. 2025-01-23 Meeting with Michael Haleva, Policy Analyst of Senator Corteze - I proposed some legislative ideas which I shared with Peter Leroe-Muñoz, General Counsel of from the Silicon Valley Leadership Group
- incentives to provide smaller starter homes, such as homes with 1,000 sqft to 1,500 sqft. - incentives to provide for-sale flats for seniors to downsize into. - sales tax restructuring so that the city where the consumer reside, the warehouse city and the city with the company sales office all get a percentage share of the sales tax. - impact to the city revenue when 100% retail site is replaced by 100% housing or less than 10% retail - incentives to provide work-live units as a solution to provide housing with potential for generating revenue for both the homeowner and the city. 2025-01-25 Lunar New Year event by the Taiwanese America American Federation of Northern California (TAFNC) at TECO
- The event room at TECO is packed with members of TAFNC. This year they have a youth portion conducted in English, which features two young Taiwanese American authors. One wrote a picture book and one wrote a non-fiction book on the identity of Taiwanese American youth. 2025-01-26 Lunar New Year event by the Chinese School Associations at TECO - The elected officials and community leaders are invited up stage to write in Chinese Calligraphy. There are patterns to help anyone to write.
- Awards given to the poster contest winners from Chinese schools. There were many activities for children. 2025-01-14 Attended Meet Legislators - hosted by the Cal Cities Peninsula Division in South San Francisco
- 5 legislators gave brief summaries of their legislative priorities this year and answered questions from the host and the audience.
977
CC 02-04-2025
977 of 985
City Council Councilmember Report
4 Section 3: Committee Assignment
2025-01-22 Valley Water Commission Meeting (meet quarterly) - Presentation on the master plan and budget.
- The water rate for the Valley Water portion, which is about 40-60% of typical water bill, would see 8-10% year-to-year growth in the next 10 years in order to fund necessary capital projects for the water infrastructure. Commissioners expressed concern on such large increases and the communication to the community.
2025-01-24 Santa Clara County Mayors meeting, hosted by San Jose Mayor Matt Mohan (meet quarterly)
- Staff of San Jose Mayor’s office presented the work of GovAI and other innovative Economic Development work.
- The mayors brain stormed potential common goals to work together, such as RV parking, fire safety (weed abatement on parcels owned by public agencies), commitment of services from the County when cities provide shelters, impact from the upcoming Super Brown and World Cups in 2026 Section 4: Information of Interest to My Constituents: (no update since the last report)

1. Builders’ Remedy (BR) Projects
★ The Planning Staff has completed the “determination of completeness” reviews for the 20739 Scofield Drive and Vista Heights projects. In both instances staff has determined that the application materials are incomplete, meaning the projects are no longer vested pursuant to Government Code Section 65941.1.

The letters that have been transmitted to the applicants are available on the City’s website here:
● Scofield: https://www.cupertino.gov/scofield
● Vista Heights: https://www.cupertino.gov/vistaheights ★ There is one more BR project that is still active: Dividend Homes at the northwest corner of Stevens Creek Blvd and De Anza. The project will replace the existing office building with town homes.
★ Status of all BR projects
★ The July 25, 2024 info memo, titled “Scofield Drive SB330 Preliminary Application pursuant to Builder’s Remedy”, has information about what are BR projects and their review process.

2. License Plate Reader Camera - City-operated or personal ones ★ The Council has adopted the Automated License Plate Reader (ALPR) Camera program (Resolution 24-094) in order to alert the police when a license plate with previous record is detected. Some cameras are placed at major roads entering Cupertnio. ★ The residents or businesses can connect your home or business surveillance camera with the Santa Clara County Sheriff's Office. The registration form is at the bottom of this page. 978
CC 02-04-2025
978 of 985
City Council Councilmember Report
5 Section 5: Information Access Useful to My Constituents:

1. “Written Communication” for a City Council meeting:
○ When will an email sent to the City Council be included in the “Written Communication” file of a Council meeting?
○ From the City Clerk:
■ Emailed comments that are related to an agenda item and received following the agenda publication prior to or during the meeting will be posted to the City’s website.
■ Emailed comments related to non-agenda items and received following the agenda publication prior to or during the meeting will be posted upon request only if it is forwarded by a councilmember, to comply with the Muni Code.

3. Recordings of Commission Meetings:

Starting in June, commission meetings will be recorded for viewing later, although no teleconferencing to allow remote participation.
- Find the recordings here under each commission.

4. Information Memo posted on the City website:

City Council Informational Memos are now available on the City website. The information can be accessed from the City website at cupertino.org/memos and the City Council page. You can also find the page by entering search terms “info memos” at the top of the website. ★ Anyone may use the eNotification signup to receive informational memo updates by email.
★ The info memos are now hosted in the digital archive as all other city records. ★ Click “+” to zoom in.
★ On a laptop:
○ To open the document as PDF, click on the Print icon and then click on “Download & Print”. The downloaded PDF will appear in a new tab for viewing. ○ This does not work on Safari browser on an iPhone.
★ To copy and paste text, you must open it as PDF and then copy & paste from there.

New memos posted, since last report:
11 - November 14, 2024 - Notification method for GPA and zoning ordinances on parcels, preliminary applications, and project proposals
11 - November 27, 2024 - City of Cupertino Electrical Utility Costs and Usage Information 979
CC 02-04-2025
979 of 985
City Council Councilmember Report
6 11 - November 27, 2024 - Rodrigues Avenue Bicycle and Pedestrian Safety Enhancements 12 - December 12, 2024 - Climate Action Plan Progress Report 12 - December 12, 2024 - Monthly Treasurer’s Investment Report for November 2024 12 - December 12, 2024 - Monthly Treasurer’s Investment Report for October 2024 12 - December 12, 2024 - Monthly Treasurer's Report for November 2024 12 - December 12, 2024 - Monthly Treasurer's Report for October 2024 12 - December 12, 2024 - Treasurerʹs Investment Report for the Quarter Ending September 30, 2024
12 - December 20, 2024 - Goal Setting Workshop Preparation – Council Top 10 Projects

4. How to Search an agenda item:

A community member showed me a way to search for items on the past city meetings:
● Go to this page: https://cupertino.legistar.com/Calendar.aspx ○ Make sure that “Calendar” is selected from the top row of tabs and the “List View” is selected from the bottom row of tabs.
○ Enter the search term, such as “investment report”. Choose the year or select “All Years”
980
CC 02-04-2025
980 of 985
City Council Councilmember Report
7 (Last Activity Report in the November 19, 2024 Council Meeting Agenda.) 981
CC 02-04-2025
981 of 985
1 CITY COUNCILMEMBER REPORT
Meeting:  February 4, 2025
Reporting Councilmember:  Councilmember J.R. Fruen
Report Dates:  1/14/25 to 1/27/25
Item Date, Title, and Description:

Event 1. January 17, 2025 – Meeting with the City Manager – I attended my regular weekly meeting with the city manager to discuss upcoming council agendas and constituent concerns.

Event 2. January 17, 2025 – Briefing on City Work Program – Staff from multiple departments offered a briefing on the City Work Program and the next steps in the process. The meeting was informative and helpful in delineating this year’s process.

Event 3. January 21, 2025 – Cities Association of Santa Clara County Executive Committee Meeting – I attended this meeting in my capacity as 2nd Vice President of the Cities Association.

The Committee discussed the agenda for upcoming board and committee meetings, as well as the schedule of meetings for the year.
982
CC 02-04-2025
982 of 985
 


 


 


 ! 

"#$%$&'((%$&'(()*'$*  "#$+,-
-!$-.-! 
/(+
0'
1+,&#$ 
-
-! 211##,,,$$31
&
,44$#$51#1,$
67879:;<7=>;?:@7A>B
,&*,)&$4'1+5
C,D*,
E5'&*%FG'1%++ ,44',$#$5114$($$*&$,H&,$41$$1$I3$*D%+J &41D$,E'(F  -K-! 211*,''$&($ 4$*LM<N7?:O:<<7?A7P$1$4 +&$,
1,#,$((&Q$I'11##&*$$1I$Q** %*(1$,&I,,,,1#I**% (R$5,F -.-! 2##,,,$
,44#,111,&,,1STUVWXYZ[T\W]>^ _:?`?:a?M<F2*,((,,'&1 *%$&'I',11,44 b#'1*(*$1$'$ 4$&'&',$&,4$&*#$R&F0*%cG ##1$*--!14$'1,&,,$F  -d-! 211*eG2$1($4*fM=>M9M?M:g=>^ ]N?M?^ h]B>?]A>ijWkllmnopVqTqknTrkmolWSTmkZWXTknYZkrrosmtVZSsT[WZuV[rtvqV[w* $#$4STxosT[YZtVynknXkWWSTzts{ooqUonnTrWVo[ktUksmvZu4&'  (#$5(,',|'$

'#,1}$,2'$,F0&*$'$
,',$ #11''',I*I($1',$4&$(#,,''1F )'&$C'' "1,
'4$4*%$
}
+,&
I''Q&Q$44
*,IQF 
-K-!/I,*$$1$1*&'$$4~€‚ƒ„ †>L7;gN9]AhM^ */1%$((
%'#,F2'$I*,5''&1$44&',  983
CC 02-04-2025
983 of 985
 
 


 
 



 !"#$
#%
""#&'$
&(#
'&
)#
&
 #

#&###&

"#&


&&
) # *+

&
', -'
)
#'#&*#
#


#''".
/ 0&&#''#"$##
''' -#12##-'/
, 
984
CC 02-04-2025
984 of 985
1 CITY COUNCILMEMBER REPORT
Meeting:  February 4, 2025
Reporting Councilmember:  Councilmember Ray Wang
Report Dates:  1/18/25 to 1/28/25
Item Date, Title, and Description:

1. January 16th – attended the swearing in ceremony of the Cupertino Chamber of Commerce

985
CC 02-04-2025
985 of 985

← All documents from this meeting