Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Date
Application
Submitted
Total
Approved
Units by
Project
Total
Disapproved
Units by
Project
Streamlining Application
Status Project Type Notes
23 4 6 7 8 9 11 12 13
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Date
Application
Submitted
(see
instructions)
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low-Income
Deed
Restricted
Low-Income
Non Deed
Restricted
Moderate-
Income
Deed
Restricted
Moderate-
Income
Non Deed
Restricted
Above
Moderate-
Income
Total PROPOSED
Units by Project
Total
APPROVED
Units by project
Total
DISAPPROVED
Units by Project
Please select state
streamlining
provision/s the
application was
submitted pursuant
to.
Did the housing
development
application seek
incentives or
concessions
pursuant to
Government Code
section 65915?
Were incentives
or concessions
requested
pursuant to
Government
Code section
65915 approved?
Please indicate
the status of the
application.
Is the project
considered a
ministerial
project or
discretionary
project?
Notes+
Summary Row: Start Data Entry Below 32 0 31 0 71 0 575 709 0 0 326 27 046, 326 27
048
326 27 046, 326 27
048
21312 DANA POINT
LN Westport ASA ‐2024‐003
MH R
6/20/2024 29
19 224 272 NONE Yes N/A Pending Discretionary
Modification to previously
approved project to add
14 additional bonus units
and eliminate
underground parking on a
portion of the project. The
remainder of the project
is built and/or under
construction.
326 32 050, 326 32
051, 326 32 052,
326 32 053,
326 32 050, 326 32
051, 326 32 052,
326 32 053,
20813, 20823,
20883 & 20807
STEVENS CREEK
BLVD
Stevens Creek Office
Center
ASA‐2024‐011,
TM‐2024‐006,
U‐2024‐008,
TR‐2024‐033
SFD O
10/25/2024
66 66 NONE Yes N/A Pending Discretionary
Replacing an existing
office center and
commerical building
326 32 050, 326 32
051, 326 32 052,
326 32 053,
326 32 050, 326 32
051, 326 32 052,
326 32 053,
20813, 20823,
20883 & 20807
STEVENS CREEK
BLVD
Stevens Creek Office
Center
ASA‐2024‐011,
TM‐2024‐006,
U‐2024‐008,
TR‐2024‐033
SFA O
10/25/2024
24 32 56 NONE Yes N/A Pending Discretionary
Replacing an existing
office center and
commerical building
356 05 007, 356 05
008, 356 27 026
356 05 007, 356 05
008, 356 27 026 Vista Heights/Linda Vista
DP‐2024‐005,
TM‐2024‐003,
TR‐2024‐029
SFD O
9/13/2024
25 25 SB 423 (2023) No N/A Pending Discretionary
Builder's Remedy Project
on previously abandoned
quarry with steep slopes.
356 05 007, 356 05
008, 356 27 026
356 05 007, 356 05
008, 356 27 026 Vista Heights/Linda Vista
DP‐2024‐005,
TM‐2024‐003,
TR‐2024‐029
5+ O
9/13/2024
8 8 SB 423 (2023) No N/A Pending Discretionary
Builder's Remedy Project
on previously abandoned
quarry with steep slopes.
356 06 001, 356 06
002, 356 06 003,
356 06 004
356 06 001, 356 06
002, 356 06 003,
356 06 004
10857, 10867,
10877 & 10887
Linda Vista Dr
Evulich Ct
(Summerhill Homes)
TM‐2024‐009,
ASA‐2024‐015,
TR‐2024‐044
SFA O
12/18/2024
11 44 55 NONE No N/A Pending Discretionary Project utilizing provisions of Density Bonus law on a
Priority Housing Element
site
316 23 025, 316 23
026
316 23 025, 316 23
026
20085 & 20111
Stevens Creek Blvd Dividend Homes ASA ‐2024‐016
SFA O
12/19/2024
12 45 57 NONE Yes N/A Pending Discretionary Replacing an existing officer center
359 08 025, 359 08
026, 359 08 028
359 08 025, 359 08
026, 359 08 028
20770, 20830 &
20840 STEVENS
CREEK BLVD
Pizza Hut/Staples/
Fontana's
(Summerhill Homes)
DP‐2024‐002,
TM‐2024‐001,
ASA‐2024‐005,
TR‐2024‐024
SFA O
10/31/2024
12 47 59 NONE No N/A Pending Discretionary
Replacing a three
commercial buildings
359 09 016 359 09 016 20739 SCOFIELD DR Scofield
ASA‐2024‐009,
TM‐2024‐004,
TR‐2024‐009
MH O
8/16/2024
4 16 20 SB 423 (2023) No N/A Pending Discretionary
Builder's Remedy Project
on a single family lot
359 13 019 359 13 019
20865 MCCLELLAN
RD McCllelan Townhomes
ASA‐2024‐012,
TM‐2024‐007,
TR‐2024‐036
SFA O
11/7/2024
3 24 27 NONE No N/A Pending Discretionary Project utilizing provisions of Density Bonus law on a
Priority Housing Element
site
362 31 003 362 31 003 20638 CLEO AVE Cleo DP ‐2024‐001 SFD O
3/11/2024
4 4 NONE No N/A Pending Discretionary Project to replace one single family home with
four detached SFD
369 06 002, 369 06
003
369 06 002, 369 06
003
10065 & 10075 E
ESTATES DR
United Furniture
(Toll Brothers)
DP‐2024‐004
ASA‐2024‐008
TM‐2024‐005
SFA O
12/18/2024
12 43 55 NONE Yes N/A Pending Discretionary
Project utilizing provisions
of Density Bonus law to
replace a commercial
shopping center
366 03 062 366 03 062
11841 Upland Way Upland Way
TM‐2025‐001,
EXC‐2025‐001,
TR‐2025‐001
SFD O
1/10/2025
2 4 6 SB 423 (2023) Yes N/A Pending Discretionary
Builder's Remedy project
326 33 023 326 33 023
20696 HANFORD
DR 20696 HANFORD DR MMP ‐2024‐002
2 to 4 O
2/20/2024
2 2 SB 9 (2021) -
Duplex in SF
Zone
No N/A Pending Ministerial
SB 9 Project found
incomplete
375 24 002 375 24 002
10430 STERLING
BLVD 10430 STERLING BLVD MMP ‐2024‐004
2 to 4 O
12/18/2024
1 1 SB 9 (2021) -
Duplex in SF
Zone
No N/A Pending Ministerial SB 9 Project found
incomplete but in
progress
359 23 013 359 23 013 20564 Kirwin Lane 20564 Kirwin Lane MTM‐2024‐001
2 to 4 O
3/11/2024
0 0 SB 9 (2021) -
Residential Lot
Split
No N/A Pending Ministerial SB 9 lot split (no new
units proposed) found
incomplete but in
progress
Table A
Cells in grey contain auto-calculation formulas
51 Project Identifier Unit Types Proposed Units - Affordability by Household Incomes Density Bonus Law Applications
10 Housing Development Applications Submitted
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Date
Application
Submitted
Total
Approved
Units by
Project
Total
Disapproved
Units by
Project
Streamlining Application
Status Project Type Notes
23 4 6 7 8 9 11 12 13
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Date
Application
Submitted
(see
instructions)
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low-Income
Deed
Restricted
Low-Income
Non Deed
Restricted
Moderate-
Income
Deed
Restricted
Moderate-
Income
Non Deed
Restricted
Above
Moderate-
Income
Total PROPOSED
Units by Project
Total
APPROVED
Units by project
Total
DISAPPROVED
Units by Project
Please select state
streamlining
provision/s the
application was
submitted pursuant
to.
Did the housing
development
application seek
incentives or
concessions
pursuant to
Government Code
section 65915?
Were incentives
or concessions
requested
pursuant to
Government
Code section
65915 approved?
Please indicate
the status of the
application.
Is the project
considered a
ministerial
project or
discretionary
project?
Notes+
Table A
Cells in grey contain auto-calculation formulas
51 Project Identifier Unit Types Proposed Units - Affordability by Household Incomes Density Bonus Law Applications
10 Housing Development Applications Submitted
316 23 004 316 23 004 20082 FOREST AVE 20082 FOREST AVE MTM‐2024‐002
2 to 4 O
8/5/2024
0 0 SB 9 (2021) -
Residential Lot
Split
No N/A Pending Ministerial SB 9 lot split (no new
units proposed) found
incomplete but in
progress
359 13 079 359 13 079 10417 TULA LN 10417 TULA LN
MTM‐2024‐003
2 to 4 O
11/22/2024
0 0 SB 9 (2021) -
Residential Lot
Split
No N/A Pending Ministerial SB 9 lot split (no new
units proposed) found
incomplete but in
progress
357 02 001 357 02 001 10209 CARMEN RD 10209 CARMEN RD MTM‐2024‐004
2 to 4 O
12/10/2024
0 0 SB 9 (2021) -
Residential Lot
Split
No N/A Pending Ministerial SB 9 lot split (no new
units proposed) found
incomplete but in
progress
326 33 023 326 33 023 20696 HANFORD
DR 20696 HANFORD DR
MTM‐2024‐005
2 to 4 O
12/12/2024
2 2 SB 9 (2021) -
Residential Lot
Split
No N/A Pending Ministerial SB 9 lot split (two new
units proposed) found
incomplete but in
progress
326 02 019 326 02 019 22071 HIBISCUS DR 22071 HIBISCUS DR MTM‐2024‐006
2 to 4 O
12/12/2024
0 0 SB 9 (2021) -
Residential Lot
Split
No N/A Pending Ministerial SB 9 lot split (no new
units proposed) found
incomplete but in
progress
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Summary Row: Start Data Entry Below 0 5 0 5 0 5 22 37 0 14 0 13 0 375 31 029 375 31 029 10840 Minette Dr
R-2023-016, RM-
2023-016 SFD O 1 1/9/2024 1
375 32 047 375 32 047 10735 Minette Drive R-2023-033, RM-202 3 SFD O 1 1/16/2024 1 362 24 055 362 24 055 7564 Shadowh ill Ln RM-2023-026 SFD O 1 2/6/2024 1 369 27 027 369 27 027 877 Betlin Ave R-2023-035 SFD O 1 2/15/2024 1 375 37 019 375 37 019 10536 S. Tantau Ave R-2023-030 SFD O 1 2/20/2024 1 375 10 049 375 10 049 10315 STERN AVE R-2023-032 SFD O 1 3/5/2024 1 375 16 034 375 16 034 18815 Tilson Avenue R-2022-054, RM-202 2 SFD O 1 3/12/2024 1 375 34 055 375 34 055 18851 Hunter Way R-2023-038, RM-202 3 SFD O 1 3/19/2024 1 342 16 083 342 16 083 10631 MERRIMAN RD R-2023-027, RM-202 3 SFD O 1 4/30/2024 1 356 17 003 356 17 003 11127 Palos Verdes Drive R-2023-039 SFD O 1 4/30/2024 1 326 08 014 326 08 014 21075 Tamarind Ct
R-2024-005, RM-
2024-004 SFD O 1 7/30/2024 1
375 10 041 375 10 041 10264 Bret Avenue R-2023-041, RM-202 3 SFD O 1 8/1/2024 1 326 19 004 326 19 004 10092 Mann Drive RM-2024-016 (BLD-2 SFD O 1 10/15/2024 1 356 08 034 356 08 034 21950 MCClellan Rd. R-2024-023 SFD O 1 10/29/2024 1 369 08 007 369 08 007 10211 E Estates Dr. R-2024-003 SFD O 1 11/7/2024 1 375 35 015 375 35 015 18980 Newsom Ave R-2024-013, RM-202 4 SFD O 1 11/19/2024 1 359 23 009 359 23 009 20642 Kirwin Ln R-2024-006, RM-2024 SFD O 1 7/30/2024 1 375 28 024 375 28 024 10640 JOHNSON AVE RM-2024-012 SFD O 1 9/26/2024 1 375 29 034 375 29 034 18751 NEWSOM AVE R-2024-015, RM-2024 SFD O 1 12/9/2024 1 375 31 029 375 31 029 10840 Minette Dr
R-2023-016, RM-
2023-016
ADU R 1 1/9/2024
1 375 32 047 375 32 047
10735 Minette Drive R-2023-033, RM-202 3 ADU R 1 1/16/2024 1 362 24 055 362 24 055 7564 Shadowh ill Ln RM-2023-026 ADU R 1 2/6/2024
1 369 27 027 369 27 027
877 Betlin Ave R-2023-035 ADU R 1 2/15/2024
1 375 37 019 375 37 019
10536 S. Tantau Ave R-2023-030 ADU R 1 2/20/2024
1 375 10 049 375 10 049 10315 STERN AVE R-2023-032
ADU R 1 3/5/2024
1 Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
375 16 034 375 16 034
18815 Tilson Avenue R-2022-054, RM-202 2 ADU R 1 3/12/2024 1 375 34 055 375 34 055
18851 Hunter Way R-2023-038, RM-202 3 ADU R 1 3/19/2024 1 342 16 083 342 16 083
10631 MERRIMAN RD R-2023-027, RM-202 3 ADU R 1 4/30/2024 1 356 17 003 356 17 003
11127 Palos Verdes Drive R-2023-039 ADU R 1 4/30/2024
1 326 08 014 326 08 014 21075 Tamarind Ct
R-2024-005, RM-
2024-004
ADU R 1 7/30/2024
1 375 10 041 375 10 041
10264 Bret Avenue R-2023-041, RM-202 3 ADU R 1 8/1/2024 1 326 19 004 326 19 004
10092 Mann Drive RM-2024-016 (BLD-2 ADU R 1 10/15/2024
1 356 08 034 356 08 034 21950 MCClellan Rd. R-2024-023
ADU R 1 10/29/2024
1 369 08 007 369 08 007 10211 E Estates Dr. R-2024-003 ADU R 1
11/7/2024 1
375 35 015 375 35 015
18980 Newsom Ave R-2024-013, RM-202 4 ADU R 1 11/19/2024 1 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
357 16 095 357 16 095 10095 ORANGE AVE MMP-2024-001 2 to 4 O 1 5/16/2024 1 375 07 022 375 07 022 19160 COZETTE LN MMP-2024-003 2 to 4 O 1 9/19/2024 1 Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
13 40 80 0 44 0 34 1 14 85 178 0
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 0 0 SB 9 (2021) - Duplex
in SF Zone Y
0 0 SB 9 (2021) - Duplex
in SF Zone Y
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
64 1 Demolished O
1 Demolished O
0 0
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
0 1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
0 1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
Demolished/Destroyed Units Density Bonus
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Demolished/Destroyed Units Density Bonus
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Demolished/Destroyed Units Density Bonus
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Summary Row: Start Data Entry Below 0 5 0 5 0 5 22 37 0 14 0 13 0 326 27 046 326 27 046 21301 DANA POINT LN, Cupertino, C A Westport BLD-2023-2676 SFA O 0 326 27 046 326 27 046 21307 DANA POINT LN, Cupertino, C A Westport BLD-2023-2679 SFA O 0 326 27 046 326 27 046 21303 DANA POINT LN, Cupertino, C A Westport BLD-2023-2677 SFA O 0 326 27 046 326 27 046 21309 DANA POINT, Cupertino, CA 9 5 Westport BLD-2023-2680 SFA O 0 326 27 046 326 27 046 21311 DANA POINT, Cupertino, CA 9 5 Westport BLD-2023-2681 SFA O 0 326 27 046 326 27 046 21305 DANA POINT, Cupertino, CA 9 5 Westport BLD-2023-2678 SFA O 0 326 27 046 326 27 046 21300 DANA POINT, Cupertino, CA 9 5 Westport BLD-2024-0650 SFA O 0 326 27 046 326 27 046 21302 DANA POINT, Cupertino, CA 9 5 Westport BLD-2024-0651 SFA O 0 326 27 046 326 27 046 21306 DANA POINT, Cupertino, CA 9 5 Westport BLD-2024-0653 SFA O 0 326 27 046 326 27 046 21304 DANA POINT, Cupertino, CA 9 5 Westport BLD-2024-0652 SFA O 0 326 02 035 326 02 035 22032 HIBISCUS BLD-2024-0346
ADU R
0 1
326 28 066 326 28 066 21076 GRENOLA DR BLD-2023-1073
ADU R
0 1
326 30 076 326 30 076 20873 HANFORD BLD-2023-1660
ADU R
0 326 30 178 326 30 178 10497 BEARDON BLD-2022-2308
ADU R
0 1
342 61 036 342 61 036 10505 MADRONE CT BLD-2024-0925
ADU R
0 1
356 14 024 356 14 024 21898 RUCKER BLD-2023-0428
ADU R
0 356 14 024 356 14 024 21900 RUCKER DR BLD-2023-2218
ADU R
0 1
357 14 072 357 14 072 10398 BYRNE BLD-2023-1654
ADU R
0 1
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
357 19 110 357 19 110 21743 ALCAZAR AVE BLD-2023-0209
ADU R
0 359 15 001 359 15 001 10316 TONITA WAY BLD-2023-1947 ADU R 0 362 08 023 362 08 023 1169 ELMSFORD DR BLD-2024-0988
ADU R
0 1
362 24 055 362 24 055 7564 SHADOWHILL LN BLD-2023-1171
ADU R
0 1
362 26 031 362 26 031 7634 SQUIREWOOD WAY BLD-2024-1133 ADU R
0 366 10 063 366 10 063 1658 JAMES TOWN DR BLD-2024-0563 ADU R
0 1
366 17 057 366 17 057 7632 NORMANDY WAY BLD-2023-1829
ADU R
0 1
366 55 023 366 55 023 11882 SHASTA SPRING CT BLD-2023-2416 ADU R
0 369 05 042 369 05 042 10128 MELLO PL BLD-2022-2213
ADU R
0 1
369 32 034 369 32 034 20125 LAS ONDAS BLD-2023-0433
ADU R
0 1
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
369 32 037 369 32 037 20012 RODRIGUES, #B BLD-2024-1328 ADU R
0 375 07 008 375 07 008 10083 S TANTAU AVE BLD-2024-0255 ADU R 0 375 14 002 375 14 002 10275 MORETTI DR BLD-2024-0884
ADU R
0 1
375 16 021 375 16 021 10315 WUNDERLICH DR BLD-2023-1584 ADU R
0 1
375 25 001 375 25 001 10221 STERLING BLVD BLD-2024-0022 ADU R
0 375 26 007 375 26 007 18671 MEDICUS CT BLD-2022-1442
ADU R
0 1
375 31 016 375 31 016 10689 GASCOIGNE BLD-2024-1719
ADU R
0 1
375 31 052 375 31 052 10703 JOHNSON BLD-2023-2395
ADU R
0 375 41 033 375 41 033 6188 SHADYGROVE DR BLD-2023-1500 ADU R
0 1
326 08 025 326 08 025 21102 LAVINA CT BLD-2023-1970
ADU R
0 1
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
359 13 136 359 13 136 10476 S STELLING RD BLD-2023-0765 ADU R
0 359 13 137 359 13 137 10468 S STELLING RD BLD-2023-0772 ADU R 0 369 24 037 369 24 037 6522 CLIFFORD DR BLD-2022-1887
ADU R
0 1
369 27 027 369 27 027 877 BETLIN AV BLD-2024-0636
ADU R
0 1
375 04 010 375 04 010 19375 CALLE DE BARCELONA BLD-2023-2520 ADU R
0 375 08 006 375 08 006 10279 S TANTAU AVE BLD-2024-1712 ADU R
0 1
375 10 049 375 10 049 10315 STERN AVE BLD-2024-0656
ADU R
0 1
375 11 031 375 11 031 10205 BRET AVE BLD-2024-0291
ADU R
0 375 16 053 375 16 053 18831 BARNHART AVE BLD-2023-1863 ADU R
0 1
375 18 044 375 18 044 10409 JOHNSON AVE BLD-2023-2360
ADU R
0 1
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
375 23 032 375 23 032 10542 STERLING BLVD BLD-2022-2098 ADU R
0 375 26 058 375 26 058 18630 CRABTREE AVE BLD-2024-0542 ADU R 0 375 28 011 375 28 011 10589 GASCOIGNE DR BLD-2023-2358
ADU R
0 1
375 31 029 375 31 029 10840 MINETTE DR BLD-2024-0758
ADU R
0 1
375 32 047 375 32 047 10735 MINETTE DR BLD-2024-0122
ADU R
0 375 35 055 375 35 055 19030 MEIGGS LN BLD-2024-0009
ADU R
0 1
326 08 025 326 08 025 21102 LAVINA CT BLD-2023-1970 SFD O 0 359 13 136 359 13 136 10476 S STELLING RD BLD-2023-0765 SFD O 0 359 13 137 359 13 137 10468 S STELLING RD BLD-2023-0772 SFD O 0 369 24 037 369 24 037 6522 CLIFFORD DR BLD-2022-1887 SFD O 0 369 27 027 369 27 027 877 BETLIN AV BLD-2024-0636 SFD O 0 375 04 010 375 04 010 19375 CALLE DE BARCELONA BLD-2023-2520 SFD O 0 375 08 006 375 08 006 10279 S TANTAU AVE BLD-2024-1712 SFD O 0 375 10 049 375 10 049 10315 STERN AVE BLD-2024-0656 SFD O 0 375 11 031 375 11 031 10205 BRET AVE BLD-2024-0291 SFD O 0 375 16 053 375 16 053 18831 BARNHART AVE BLD-2023-1863 SFD O 0 375 18 044 375 18 044 10409 JOHNSON AVE BLD-2023-2360 SFD O 0 375 23 032 375 23 032 10542 STERLING BLVD BLD-2022-2098 SFD O 0 375 26 058 375 26 058 18630 CRABTREE AVE BLD-2024-0542 SFD O 0 375 28 011 375 28 011 10589 GASCOIGNE DR BLD-2023-2358 SFD O 0 375 31 029 375 31 029 10840 MINETTE DR BLD-2024-0758 SFD O 0 375 32 047 375 32 047 10735 MINETTE DR BLD-2024-0122 SFD O 0 375 35 055 375 35 055 19030 MEIGGS LN BLD-2024-0009 SFD O 0 326 45 041 326 45 041 21848 CORTE MADERA LN BLD-2024-0394 SFD O 0 342 14 095 342 14 095 10116 PRADO VISTA DR BLD-2023-2396 SFD O 0 357 19 053 357 19 053 10290 IMPERIAL AVE BLD-2021-1258 SFD O 0 359 26 043 359 26 043 1017 WESTLYNN WAY BLD-2024-0872 SFD O 0 366 17 057 366 17 057 7632 NORMANDY WAY BLD-2023-1828 SFD O 0 375 07 008 375 07 008 10081 S TANTAU AVE BLD-2024-0254 SFD O 0 375 11 011 375 11 011 10080 JUDY AVE BLD-2023-0987 SFD O 0 375 13 002 375 13 002 18916 ARATA WAY BLD-2022-0759 SFD O 0 375 23 021 375 23 021 10567 STERLING BLVD BLD-2024-0540 SFD O 0 Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
13 40 80 0 44 0 34 1 14 85 178 0
1 1/31/2024 1 0N O N E Y
1 1/31/2024 1 0N O N E Y
1 1/31/2024 1 0N O N E Y
1 1/31/2024 1 0N O N E Y
1 1/31/2024 1 0N O N E Y
1 2/6/2024 1 0N O N E Y
1 3/28/2024 1 0N O N E Y
1 3/28/2024 1 0N O N E Y
1 3/28/2024 1 0N O N E Y
1 3/28/2024 1 0N O N E Y
5/18/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
3/21/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 9/10/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
2/10/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
12/6/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 8/1/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
8/1/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
4/23/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 1
10/1/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 10/15/2024 1 0N O N E Y
9/18/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
9/19/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 12/12/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
8/30/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
4/16/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 10/7/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
3/26/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
2/2/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 1
12/23/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 1/25/2024 1 0N O N E Y
4/24/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
5/1/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 6/11/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
8/2/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
12/13/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 8/30/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
9/18/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
8/28/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 1
4/4/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 4/4/2024 1 0N O N E Y
11/4/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
8/9/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 9/24/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
11/26/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
7/9/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 9/23/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
2/26/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
6/3/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 1
1/22/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 8/13/2024 1 0N O N E Y
4/24/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
10/16/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 9/4/2024
1 0N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
8/6/2024
1 0 0 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
1 8/28/2024 1 0N O N E Y
1 4/4/2024 1 0N O N E Y
1 4/4/2024 1 0N O N E Y
1 11/4/2024 1 0N O N E Y
1 8/9/2024 1 0N O N E Y
1 9/24/2024 1 0N O N E Y
1 11/26/2024 1 0N O N E Y
1 7/9/2024 1 0N O N E Y
1 9/23/2024 1 0N O N E Y
1 2/26/2024 1 0N O N E Y
1 6/3/2024 1 0N O N E Y
1 1/22/2024 1 0N O N E Y
1 8/13/2024 1 0N O N E Y
1 4/24/2024 1 0N O N E Y
1 10/16/2024 1 0N O N E Y
1 9/4/2024 1 0N O N E Y
1 8/6/2024 1 0N O N E Y
1 2/14/2024 1 0N O N E Y
1 10/17/2024 1 0N O N E Y
1 4/22/2024 1 0N O N E Y
1 4/23/2024 1 0N O N E Y
1 3/4/2024 1 0N O N E Y
1 1/25/2024 1 0N O N E Y
1 4/23/2024 1 0N O N E Y
1 1/30/2024 1 0N O N E Y
1 3/7/2024 1 0N O N E Y
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
64 Demolished/Destroyed Units Density Bonus
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Demolished/Destroyed Units Density Bonus
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Demolished/Destroyed Units Density Bonus
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Demolished/Destroyed Units Density Bonus
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Demolished/Destroyed Units Density Bonus
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Summary Row: Start Data Entry Below 0 5 0 5 0 5 22 37 0 14 0 13 0 375 23 021 375 23 021 10567 STERLING BLVD BLD-2024-0540 SFD O 0 342 14 104 342 66 001 22540 STEVENS CREEK, Cupertino, C Alan Row BLD-2022-2196 SFA O 0 342 14 104 342 66 002 22536 STEVENS CREEK, Cupertino, C Alan Row BLD-2022-2197 SFA O 0 342 14 104 342 66 003 22532 STEVENS CREEK, Cupertino, C Alan Row BLD-2022-2198 SFA O 0 342 14 104 342 66 004 22528 STEVENS CREEK, Cupertino, C Alan Row BLD-2022-2199 SFA O 0 342 14 104 342 66 005 22524 STEVENS CREEK, Cupertino, C Alan Row BLD-2022-2200 SFA O 0 342 14 104 342 66 006 22520 STEVENS CREEK, Cupertino, C Alan Row BLD-2022-2201 SFA O 0 342 14 104 342 66 007 22516 STEVENS CREEK, Cupertino, C Alan Row BLD-2022-2202 SFA O 0 342 14 104 342 66 008 10147 S FOOTHILL, Cupertino, CA 95 0 Alan Row BLD-2022-2203 SFA O 0 342 14 104 342 66 009 10149 S FOOTHILL, Cupertino, CA 95 0 Alan Row BLD-2022-2204 SFA O 0 326 27 043 21545 POINT REYES Westport BLD-2022-1699 SFA O 0 326 27 043 21543 POINT REYES TER, Cupertino, Westport BLD-2022-1700 SFA O 0 326 27 043 21541 POINT REYES TER, Cupertino, Westport BLD-2022-1701 SFA O 0 326 27 043 21539 POINT REYES TER, Cupertino, Westport BLD-2022-1702 SFA O 0 326 27 043 21537 POINT REYES TER, Cupertino, Westport BLD-2022-1703 SFA O 0 326 27 043 21535 POINT REYES TER, Cupertino, Westport BLD-2022-1704 SFA O 0 326 27 043 21533 POINT REYES TER, Cupertino, Westport BLD-2022-1705 SFA O 0 326 27 043 21531 POINT REYES TER, Cupertino, Westport BLD-2022-1706 SFA O 0 326 27 043 21500 DANA POINT LN, Cupertino, C A Westport BLD-2022-1711 SFA O 0 326 27 043 21502 DANA POINT LN, Cupertino, C A Westport BLD-2022-1712 SFA O 0 326 27 043 21504 DANA POINT, Cupertino, CA 9 5 Westport BLD-2022-1713 SFA O 0 326 27 043 21506 DANA POINT LN, Cupertino, C A Westport BLD-2022-1714 SFA O 0 326 27 043 21508 DANA POINT LN, Cupertino, C A Westport BLD-2022-1715 SFA O 0 326 27 043 21510 DANA POINT, Cupertino, CA 9 5 Westport BLD-2022-1716 SFA O 0 326 27 043 21521 POINT REYES, Cupertino, CA 9 Westport BLD-2023-0601 SFA O 0 326 27 043 21500 POINT REYES, Cupertino, CA 9 Westport BLD-2023-0602 SFA O 0 326 27 043 21527 POINT REYES, Cupertino, CA 9 Westport BLD-2023-0603 SFA O 0 326 27 043 21525 POINT REYES, Cupertino, CA 9 Westport BLD-2023-0604 SFA O 0 326 27 043 21523 POINT REYES, Cupertino, CA 9 Westport BLD-2023-0605 SFA O 0 326 27 043 21502 POINT REYES, Cupertino, CA 9 Westport BLD-2023-0606 SFA O 0 326 27 043 21504 POINT REYES, Cupertino, CA 9 Westport BLD-2023-0607 SFA O 0 326 27 043 21506 POINT REYES, Cupertino, CA 9 Westport BLD-2023-0608 SFA O 0 326 27 043 21508 POINT REYES, Cupertino, CA 9 Westport BLD-2023-0609 SFA O 0 326 62 049 21509 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1597 SFA O 0 326 62 049 21511 POINT REYES TER, CUPERTI N Westport BLD-2023-1598 SFA O 0 326 62 051 21513 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1599 SFA O 0 326 62 052 21515 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1600 SFA O 0 326 62 045 21501 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1602 SFA O 0 326 62 046 21503 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1603 SFA O 0 326 62 047 21505 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1604 SFA O 0 326 62 048 21507 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1605 SFA O 0 326 62 041 21409 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1607 SFA O 0 326 62 042 21411 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1608 SFA O 0 326 62 043 21413 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1609 SFA O 0 326 62 044 21415 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1610 SFA O 0 326 62 037 21401 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1612 SFA O 0 326 62 039 21405 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1614 SFA O 0 326 62 040 21407 POINT REYES, Cupertino, CA 9 Westport BLD-2023-1615 SFA O 0 326 27 046 21400 POINT REYES TER, Cupertino, Westport BLD-2023-2572 SFA O 0 326 27 046 21402 POINT REYES TER, Cupertino, Westport BLD-2023-2573 SFA O 0 326 27 046 21404 POINT REYES TER, Cupertino, Westport BLD-2023-2574 SFA O 0 326 27 046 21406 POINT REYES TER, Cupertino, Westport BLD-2023-2575 SFA O 0 326 27 046 21408 POINT REYES TER, Cupertino, Westport BLD-2023-2576 SFA O 0 326 27 046 21410 POINT REYES, Cupertino, CA 9 Westport BLD-2023-2577 SFA O 0 326 27 046 21300 POINT REYES TER, Cupertino, Westport BLD-2023-2709 SFA O 0 326 27 046 21302 POINT REYES TER, Cupertino, Westport BLD-2023-2725 SFA O 0 Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
326 27 046 21304 POINT REYES TER, Cupertino, Westport BLD-2023-2726 SFA O 0 326 27 046 21306 POINT REYES TER, Cupertino, Westport BLD-2023-2727 SFA O 0 326 27 046 21308 POINT REYES TER, Cupertino, Westport BLD-2023-2728 SFA O 0 326 27 046 21310 POINT REYES TER, Cupertino, Westport BLD-2023-2729 SFA O 0 326 08 001 326 08 001 10737 N STELLING BLD-2021-1349
ADU R
0 326 24 061 326 24 061 10181 EMPIRE AVE BLD-2022-2147
ADU R
0 369 24 055 369 24 055 6654 CLIFFORD BLD-2023-0018
ADU R
0 359 14 010 359 14 010 10439 TONITA WAY BLD-2023-0841
ADU R
0 375 09 006 375 09 006 19042 TILSON AVE BLD-2023-1359
ADU R
0 366 15 056 366 15 056 7498 BARNHART PL BLD-2023-1548
ADU R
0 326 13 086 326 13 086 22276 HARTMAN DR BLD-2023-1817
ADU R
0 362 15 042 362 15 042 7834 FESTIVAL DR BLD-2023-2229
ADU R
0 326 02 036 326 02 036 22033 WALLACE BLD-2023-2739
ADU R
0 359 26 015 359 26 015 7453 DE LA FARGE DR BLD-2021-2081 ADU R 0 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
362 09 020 362 09 020 1136 ELMSFORD DR BLD-2023-1298
ADU R
0 366 15 021 366 15 021 1468 PRIMROSE WAY BLD-2023-1577 ADU R
0 326 28 066 326 28 066 21076 GRENOLA DR BLD-2023-2510 SFD O 0 375 32 003 375 32 003 10818 CARVER DR BLD-2019-1040 SFD O 0 366 38 007 366 38 007 21650 RAINBOW CT BLD-2019-1606 SFD O 0 375 07 019 375 07 019 19135 COZETTE BLD-2020-0287
ADU R
0 375 15 047 375 15 047 10385 MENHART LN BLD-2020-0406 SFD O 0 375 31 038 375 31 038 10750 MINETTE DR BLD-2020-1316
ADU R
0 375 31 038 375 31 038 10754 MINETTE DR BLD-2020-1317
ADU R
0 375 17 055 375 17 055 18791 BARNHART BLD-2020-1994 SFD O 0 357 19 059 357 19 059 21725 MCCLELLAN BLD-2020-2074
ADU R
0 357 19 043 357 19 043 10291 IMPERIAL AVE BLD-2021-0228 SFD O 0 356 11 052 356 11 052 909 PROVIDENCE CT BLD-2021-0297 SFD O 0 362 04 047 362 04 047 7922 WOODLARK WAY BLD-2021-0379 SFD O 0 359 23 001 359 23 001 7544 KIRWIN LN BLD-2021-0952 SFD O 0 375 05 035 375 05 035 19433 PHIL LN BLD-2021-1161 SFD O 0 375 31 065 375 31 065 10831 JOHNSON AVE BLD-2021-1305
ADU R
0 357 11 010 357 11 010 10151 BYRNE AVE BLD-2021-1402
ADU R
0 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
357 02 004 357 02 004 10271 SCENIC BLVD BLD-2021-1598
ADU R
0 359 10 048 359 10 048 20573 RODRIGUES AVE BLD-2021-1689 SFD O 0 356 07 017 356 07 017 21965 HYANNISPORT DR BLD-2021-1941 SFD O 0 375 34 065 375 34 065 10623 TUGGLE BLD-2021-2222 ADU R 0 375 32 057 375 32 057 10827 MINETTE DR BLD-2021-2240
ADU R
0 342 16 053 342 16 053 10535 MERRIMAN RD BLD-2021-2302 SFD O 0 375 26 036 375 26 036 18631 BARNHART AVE BLD-2021-2441
ADU R
0 326 30 005 326 30 005 20941 ALVES DR BLD-2021-2506 SFD O 0 375 30 024 375 30 024 10840 JOHNSON AVE BLD-2022-0149
ADU R
0 375 17 012 375 17 012 10320 WUNDERLICH DR BLD-2022-0396 SFD O 0 362 27 027 362 27 027 7625 WEST HILL LN BLD-2022-0441 SFD O 0 375 31 049 375 31 049 10667 WUNDERLICH BLD-2022-0490
ADU R
0 359 31 045 359 31 045 1111 ST EEPLECHASE LN BLD- 2022-0527 ADU R
0 342 29 054 342 29 054 10463 MERRIMAN BLD-2022-0558
ADU R
0 375 25 044 375 25 044 10377 STERLING Blvd BLD-2022-0613 ADU R
0 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
326 43 042 326 43 042 10692 PEBBLE BLD-2022-0652
ADU R
0 375 37 018 375 37 018 10548 S TANTAU AVE BLD-2022-0663 ADU R
0 375 34 065 375 34 065 10621 TUGGLE PL BLD-2022-0674 ADU R 0 375 33 043 375 33 043 18890 PENDERGAST AVE BLD-2022-0737 ADU R
0 326 30 136 326 30 136 20903 FARGO DR BLD-2022-0880 SFD O 0 369 05 022 369 05 022 10153 D EEPROSE BLD- 2022-0931
ADU R
0 369 08 012 369 08 012 10277 E ESTATES DR BLD-2022-0942 SFD O 0 375 25 049 375 25 049 18689 CRABTREE BLD-2022-1632
ADU R
0 375 24 021 375 24 021 10270 STERLING BLVD BLD-2022-1655 ADU R
0 375 32 040 375 32 040 10683 MINETTE PL BLD-2022-1748 SFD O 0 369 11 004 369 11 004 10395 LANSDALE BLD-2022-1977
ADU R
0 375 25 005 375 25 005 18625 RALYA CT BLD-2022-2045
ADU R
0 375 08 029 375 08 029 19161 TILSON AVE BLD-2022-2076 SFD O 0 359 19 005 359 19 005 10567 JOHN WAY BLD-2022-2111 SFD O 0 326 08 042 326 08 042 10682 FLORA VISTA AVE BLD-2022-2258 SFD O 0 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
375 23 034 375 23 034 10526 STERLING BLVD BLD-2022-2332 ADU R
0 326 30 106 326 30 106 10467 GLENCOE DR BLD-2022-2340
ADU R
0 375 14 034 375 14 034 10300 STERN AVE BLD-2022-2469
ADU R
0 375 32 049 375 32 049 10755 MINETTE DR BLD-2022-2471 ADU R 0 375 40 042 375 40 042 19181 PHIL LN BLD-2022-2499
ADU R
0 342 14 094 342 14 094 10134 PRADO VISTA BLD-2022-2513 ADU R
0 375 19 023 375 19 023 10140 CALVERT DR BLD-2023-0022
ADU R
0 326 02 021 326 02 021 22091 HIBISCUS CT BLD-2023-0247 SFD O 0 342 16 130 342 16 130 10586 SANTA LUCIA BLD-2023-1326
ADU R
0 359 24 052 359 24 052 7565 DUMAS BLD-2023-1490
ADU R
0 316 30 055 316 30 055 10572 CYPRESS BLD-2023-1494
ADU R
0 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Table A2
23 56
Prior APN+ Current APN Street Address Project Name+ Local Jurisdiction Tracking ID
Unit Category
(SFA,SFD,2 to
4,5+,ADU,MH)
Tenure
R=Renter
O=Owner
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Entitlement
Date Approved # of Units issued
Entitlements
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Note: "+" indicates an optional field
Project Identifier
Annual Building Activity Report Summary - New Construction, Entitled, Permits and Completed Units 1 Unit Types Affordability by Household Incomes - Completed Entitlement Affordability by Household Incomes - Building 4 7
326 28 097 326 28 097 21126 GREENLEAF BLD-2023-1974
ADU R
0 342 14 104 342 66 007 22516 STEVENS CREEK, Cupertino, C Alan Row BLD-2022-2202 ADU R
0 326 27 049 21301 Point Reyes BLD-2021-1586 5+ R 0
Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
13 40 80 0 44 0 34 1 14 85 178 0
1 3/7/2024 1 0N O N E Y
0 1 11/1/2024 1 NONE Y
0 1 11/1/2024 1 NONE Y Other INC
0 1 11/1/2024 1 NONE Y
0 1 11/1/2024 1 NONE Y
0 1 11/1/2024 1 NONE Y
0 1 11/1/2024 1 NONE Y
0 1 11/1/2024 1 NONE Y
0 1 11/1/2024 1 NONE Y
0 1 11/1/2024 1 NONE Y
0 1 3/11/2024 1 NONE Y
0 1 3/11/2024 1 NONE Y
0 1 3/11/2024 1 NONE Y
0 1 3/11/2024 1 NONE Y
0 1 3/11/2024 1 NONE Y
0 1 3/11/2024 1 NONE Y
0 1 3/11/2024 1 NONE Y
0 1 3/11/2024 1 NONE Y
0 1 3/22/2024 1 NONE Y
0 1 3/22/2024 1 NONE Y
0 1 3/22/2024 1 NONE Y
0 1 3/22/2024 1 NONE Y
0 1 3/22/2024 1 NONE Y
0 1 3/22/2024 1 NONE Y
0 1 4/23/2024 1 NONE Y
0 1 5/20/2024 1 NONE Y
0 1 4/23/2024 1 NONE Y
0 1 4/25/2024 1 NONE Y
0 1 4/25/2024 1 NONE Y
0 1 5/20/2024 1 NONE Y
0 1 5/20/2024 1 NONE Y
0 1 5/20/2024 1 NONE Y
0 1 5/20/2024 1 NONE Y
0 1 6/25/2024 1 NONE Y
0 1 6/25/2024 1 NONE Y
0 1 6/25/2024 1 NONE Y
0 1 6/25/2024 1 NONE Y
0 1 6/25/2024 1 NONE Y
0 1 6/25/2024 1 NONE Y
0 1 6/25/2024 1 NONE Y
0 1 6/25/2024 1 NONE Y
0 1 9/27/2024 1 NONE Y
0 1 9/27/2024 1 NONE Y
0 1 9/27/2024 1 NONE Y
0 1 9/27/2024 1 NONE Y
0 1 9/27/2024 1 NONE Y
0 1 9/27/2024 1 NONE Y
0 1 9/27/2024 1 NONE Y
0 1 10/1/2024 1 NONE Y
0 1 9/30/2024 1 NONE Y
0 1 9/30/2024 1 NONE Y
0 1 9/30/2024 1 NONE Y
0 1 9/30/2024 1 NONE Y
0 1 9/30/2024 1 NONE Y
0 1 10/1/2024 1 NONE Y
0 1 10/30/2024 1 NONE Y
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 0 1 10/30/2024 1 NONE Y
0 1 10/1/2024 1 NONE Y
0 1 10/30/2024 1 NONE Y
0 1 10/30/2024 1 NONE Y
01 2/7/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 11/19/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1
6/10/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 6/17/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 11/27/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1
10/2/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 8/28/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 9/12/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1
12/20/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 4/14/2024 1N O N E Y
Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 01
4/11/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 3/14/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 4/26/2024 1N O N E Y
0 1 2/20/2024 1N O N E Y
0 1 11/21/2024 1N O N E Y
0 1
1/18/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 2/28/2024 1N O N E Y
01 5/8/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 5/15/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 1/31/2024 1N O N E Y
0 1
6/3/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 10/7/2024 1N O N E Y
0 1 3/20/2024 1N O N E Y
0 1 8/2/2024 1N O N E Y
0 1 2/29/2024 1N O N E Y
0 1 8/27/2024 1N O N E Y
01 2/5/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 2/26/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 0 1
11/18/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 1/25/2024 1N O N E Y
0 1 3/21/2024 1N O N E Y
0 1 9/12/2024 1N O N E Y
01 6/3/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 6/4/2024 1N O N E Y
01 2/26/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 11/6/2024 1N O N E Y
0 1
1/23/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 12/3/2024 1N O N E Y
0 1 8/15/2024 1N O N E Y
01 6/18/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 5/13/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1
8/20/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 4/29/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 01
3/17/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1
5/20/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 9/16/2024 1N O N E Y
01 5/3/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 1/25/2024 1N O N E Y
01 5/7/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 9/12/2024 1N O N E Y
0 1
4/11/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 10/8/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 6/12/2024 1N O N E Y
01 6/28/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1
6/6/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 4/23/2024 1N O N E Y
0 1 9/26/2024 1N O N E Y
0 1 7/15/2024 1N O N E Y
Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 01
8/20/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 10/17/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1
6/18/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 6/6/2024 1N O N E Y
01 6/24/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 4/2/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1
6/5/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 9/23/2024 1N O N E Y
01 6/5/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
01 8/20/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1
5/28/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
Streamlining Infill
Housing without Financial
Assistance or Deed
Restrictions
89 11 12 13 14 15 16 17 18
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Building Permits
Date Issued
# of Units Issued
Building Permits
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income
Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate-
Income Deed
Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Certificates of
Occupancy or other
forms of readiness
(see instructions) Date
Issued
# of Units
issued
Certificates of
Occupancy or
other forms of
readiness
How many of the
units were
Extremely Low
Income?
Please select the
state streamlining
provision the project
was APPROVED
pursuant to. (may
select multiple)
Infill Units?
Y/N+
Assistance Programs
for Each Development
(may select multiple -
see instructions)
Deed Restriction
Type
(may select multiple -
see instructions)
For units affordable without
financial assistance or deed
restrictions, explain how the
locality determined the units
were affordable
(see instructions)
Housing with Financial Assistance
and/or Deed RestrictionsPermits Affordability by Household Incomes - Certificates of Occupancy 10 01
12/10/2024
1N O N E Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 1 11/1/2024 1 NONE Y
ADU affordability assumptions
from ABAG’s ADU affordability
methodology for the Annual
Progress Reports covering
calendar year 2023 and 2024
30/30/30/10
0 29 19 9/24/2024 48 LIHTC DB Sec 202 99
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
64 1 Demolished O
99 Demolished/Destroyed Units Density Bonus
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Demolished/Destroyed Units Density Bonus
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Demolished/Destroyed Units Density Bonus
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Demolished/Destroyed Units Density Bonus
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Demolished/Destroyed Units Density Bonus
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
1 Demolished O
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Demolished/Destroyed Units Density Bonus
1 Demolished O
Term of Affordability
or Deed Restriction Notes
19 20 21 22 23 24 25
Term of Affordability or
Deed Restriction (years)
(if affordable in perpetuity
enter 1000)+
Number of
Demolished/Destroyed
Units
Demolished or
Destroyed Units
Demolished/Des
troyed Units
Owner or Renter
Total Density Bonus Applied to
the Project (Percentage
Increase in Total Allowable
Units or Total Maximum
Allowable Residential Gross
Floor Area)
Number of Other
Incentives,
Concessions, Waivers,
or Other Modifications
Given to the Project
(Excluding Parking
Waivers or Parking
Reductions)
List the incentives,
concessions,
waivers, and
modifications
(Excluding Parking
Waivers or Parking
Modifications)
Did the project receive a
reduction or waiver of
parking standards? (Y/N)
Notes+
Demolished/Destroyed Units Density Bonus
9.3% 3 Development Standards
Modification Yes
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
1 Projection Period 34
RHNA Allocation by
Income Level
Projection Period -
06/30/2022-
01/30/2023
2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Units to Date (all years)
Total Remaining
RHNA by Income
Level
Deed Restricted - - - - - - - - - - Non-Deed Restricted - 10 14 - - - - - - - Deed Restricted - - - - - - - - - - Non-Deed Restricted 2 8 13 - - - - - - - Deed Restricted 1 - - - - - - - - - Non-Deed Restricted 19 9 13 - - - - - - - Above Moderate 1,953 92 36 40 - - - - - - - 168 1,785 4,588
114 63 80 - - - - - - - 257 4,331 5 67
Extremely low-Income
Need 2023 2024 2025 2026 2027 2028 2029 2030 2031 Total Units to Date
Total Units
Remaining
597 - - - - - - - - - - 597 664
Total RHNA
Total Units
Income Level
Very Low
Low
Extremely Low-Income Units*
Progress toward extremely low-income housing need, as determined pursuant to Government Code 65583(a)(1). 713
24 This table is auto-populated once you enter your jurisdiction name and current year data. Past year information comes from previous APRs.
42 Moderate
1,193
687
755
Please contact HCD if your data is different than the material supplied here 23 2
Table B
Regional Housing Needs Allocation Progress
Permitted Units Issued by Affordability
1,169
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Year 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Date of Rezone Rezone Type
2 4567 9 1 0 1 1
APN Street Address Project Name+
Local
Jurisdiction
Tracking ID+
Date of Rezone Very Low-
Income Low-Income Moderate-Income Above Moderate-
Income
Rezone Type Parcel Size
(Acres)
General Plan
Designation Zoning Minimum
Density Allowed
Maximum
Density Allowed
Realistic
Capacity Vacant/Nonvacant Description of Existing
Uses
805 483 741 1208 3237
31623027 20149 Stevens Creek
Blvd
Sun Design 1 8/15/2024 9 5 6 15 Shortfall of Sites 0.64 H/VHD - High/Very High
Density
R4 50.01 65 35 Non-Vacant Commercial
36903005 20010 Stevens Creek
Blvd
Sweet Maple 2 8/15/2024 8 4 5 12 Shortfall of Sites 0.47 H/VHD - High/Very High
Density
R4 50.01 65 29 Non-Vacant Commercial
32634047 10125 Bandley Dr Lei Garden 3 8/15/2024 17 10 11 29 Shortfall of Sites 1.09 H/VHD - High/Very High
Density
R4 50.01 65 67 Non-Vacant Commercial
35907006 20950 Stevens Creek
Blvd
Mr. Sun 4 8/15/2024 5 3 3 9 Shortfall of Sites 0.32 H/VHD - High/Very High
Density
R4 50.01 65 20 Non-Vacant Commercial
37506006 19220 Stevens Creek
Blvd
Les Pavillons 5 8/15/ 2024 33 20 21 56 Shortfall of Sites 1.71 VHD - Very High Density
R4 65.01 80 130 Non-Vacant Office
37506007 19300 Stevens Creek
Blvd
Les Pavillons 6 8/15/ 2024 19 11 12 31 Shortfall of Sites 0.96 VHD - Very High Density
R4 65.01 80 73 Non-Vacant Office
31621031 19875 Stevens Creek
Blvd
Cort 7 8/15/2024 29 17 18 48 Shortfall of Sites 1.81 H/VHD - High/Very High
Density
R4 50.01 65 112 Non-Vacant Commercial
31623026 20111 Stevens Creek
Blvd
20111 SCB 8 8/15/2024 28 17 18 47 Shortfall of Sites 1.78 H/VHD - High/Very High
Density
R4 50.01 65 110 Non-Vacant Office
32632050 20883 Stevens Creek
Blvd
Foxlink 9 8/15/2024 13 8 8 22 Shortfall of Sites 0.83 H/VHD - High/Very High
Density
R4 50.01 65 51 Non-Vacant Office
32627053 Mary Avenue site Mary Ave Affordable
Housing
10 8/15/2024 20 20 Shortfall of Sites 0.75 H/VHD -
High/Very High
Density
R4 50.01 65 40 Vacant Vacant
32336018 11025 N De Anza Blvd 11025 DA 11 8/15/2024 7 4 4 11 Shortfall of Sites 0.42 H/VHD - High/Very High
Density
R4 50.01 65 26 Vacant Vacant
31604064 19820 Homestead Rd 19820 Homestead 12 8/15/2024 4 4 Shortfall of Sites 0.44 MD - Medium Density
R3/TH 10.01 20 8 Non-Vacant Single Family Residential
36937022 20421 Bolinger Rd Bolinger
Residences
13 8/15/2024 6 4 4 10 Shortfall of Sites 0.39 VHD - Very High Density
R4 50.01 65 24 Vacant Vacant
36937023 20411 Bolinger Rd Bolinger
Residences
14 8/15/2024 1 6 Shortfall of Sites 0.22 MHD - Medium
High Density
R3/TH 20.01 35 7 Non-Vacant Duplex Residential
36937024 20431 Bo llinger Rd Bolinger
Residences
15 8/15/2024 1 5 Shortfall of Sites 0.17 MHD - Medium
High Density
R3/TH 20.01 35 6 Non-Vacant Single Family Residential
36934053 10891 S Blaney Ave Pacific Rim 16 8/15/2024 4 3 3 8 Shortfall of Sites 0.54 MHD - Medium High Density
R3/TH 20.01 35 18 Non-Vacant Commercial
35918044 10619 S De Anza Blvd Spa 17 8/15/2024 4 3 3 6 Shortfall of Sites 0.26 H/VHD - High/Very High
Density
R4 50.01 65 16 Non-Vacant Commercial
36610121 1505 S De Anza Blvd Kelly-Moore 18 8/15/2024 11 7 7 20 Shortfall of Sites 1.34 MHD - Medium High Density
R3/TH 20.01 35 45 Non-Vacant Commercial
36610137 no address Kindercare 19 8/15/2024 8 5 5 13 Shortfall of Sites 0.92 MHD - Medium High Density
R3/TH 20.01 35 31 Non-Vacant Parking
36619047 1361 S De Anza Blvd Yamagami 20 8/15/2024 37 22 23 62 Shortfall of Sites 2.33 H/VHD - High/Very High
Density
R4 50.01 65 144 Non-Vacant Commercial
36619078 No Address Yamagami 21 8/15/2024 1 4 Shortfall of Sites 0.08 H/VHD - High/Very High
Density
R4 50.01 65 5 Non-Vacant Commercial
35909017 10105 S De Anza Blvd Child's Play 22 8/15/2024 16 9 10 27 Shortfall of Sites 1 H/VHD - High/Very High
Density
R4 50.01 65 62 Non-Vacant Office
31620088 No Address Wolf Rd Educator
Housing
23 8/15/2024 130 77 112 Shortfall of Sites 5.16 VHD - Very High Density
R4 50.01 65 319 Vacant Vacant
35913019 20865 McClellan Rd 20865 MC 24 8/15/2024 5 3 3 8 Shortfall of Sites 0.99 MD - Medium Density
R3 10.01 20 19 Non-Vacant Single Family Residential
35606001 10857 Linda Vista Dr Evulich 25 8/15/2024 6 4 4 10 Shortfall of Sites 0.73 MHD - Medium High Density
R3/TH 20.01 35 24 Non-Vacant Single Family Residential
35606002 10867 Linda Vista Dr Evulich 26 8/15/2024 6 3 4 10 Shortfall of Sites 0.69 MHD - Medium High Density
R3/TH 20.01 35 23 Non-Vacant Single Family Residential
35606003 10877 Linda Vista Dr Evulich 27 8/15/2024 5 3 Shortfall of Sites 0.25 MHD - Medium High Density
R3/TH 20.01 35 8 Non-Vacant Single Family Residential
35606004 10887 Linda Vista Dr Evulich 28 8/15/2024 8 4 5 12 Shortfall of Sites 0.87 MHD - Medium High Density
R3/TH 20.01 35 29 Non-Vacant Single Family Residential
36231001 20666 Cleo Ave 20666 Cleo 29 8/15/2024 1 7 Shortfall of Sites 0.25 MHD - Medium High Density
R3/TH 20.01 35 8 Non-Vacant Single Family Residential
36231030
No Address (on Cleo) Cleo Site 30 8/15/2024 1 7 Shortfall of Sites 0.23 MHD - Medium High Density
R3/TH 20.01 35 8 Vacant Vacant
32720034 10231 Adriana Ave 10231 Adriana 31 8/15/2024 2 11 Shortfall of Sites 1.34 LM - Low Medium Density
R3/TH 5.01 10 13 Non-Vacant Single Family Residential
31623093 20007 Stevens Creek
Blvd
Vidyarambh 32 8/15/2024 16 10 87 Shortfall of Sites 1.35 Commercial/Resi dential - HVH
P(CG/R4) 50.01 65 113 Non-Vacant Commercial
31623036 10051 N Blaney Ave Vidyarambh 33 8/15/2024 3 1 15 Shortfall of Sites 0.24 Commercial/Resi dential - HVH
P(CG/R4) 50.01 65 19 Non-Vacant Commercial
36906002 19610 Stevens Creek
Blvd
Idlewild 34 8/15/2024 31 23 Shortfall of Sites 0.9 Commercial/Resi dential - VH
P(CG/R4) 65.01 80 54 Non-Vacant Commercial
36906003 10071 E Estates Dr Idlewild 35 8/15/2024 18 14 Shortfall of Sites 0.53 Commercial/Resi dential - VH
P(CG/R4) 65.01 80 32 Non-Vacant Commercial
36906004 10075 E Estates Dr Idlewild 36 8/15/2024 44 33 Shortfall of Sites 1.29 Commercial/Resi dential - VH
P(CG/R4) 65.01 80 77 Non-Vacant Parking
35910015 10133 S De Anza Blvd S&G 37 8/15/2024 15 9 9 25 Shortfall of Sites 1.18 Commercial/Resi dential - HVH
P(CG/R4) 50.01 65 58 Non-Vacant Commercial
35910060 10211 S De Anza Blvd Vardy's 38 8/15/2024 13 7 8 20 Shortfall of Sites 0.98 Commercial/Resi dential - HVH
P(CG/R4) 50.01 65 48 Non-Vacant Commercial
35910044 10201 S De Anza Blvd Hao's Healing 39 8/15/2024 5 4 Shortfall of Sites 0.18 Commercial/Resi dential - HVH
P(CG/R4) 50.01 65 9 Non-Vacant Office
35908025 20840 Stevens Creek
Blvd
Crossroads West 40 8/15/2024 10 6 6 18 Shortfall of Sites 0.83 Commercial/Resi dential - HVH
P(CG/R4) 50.01 65 40 Non-Vacant Commercial
35908026 20830 Stevens Creek
Blvd
Crossroads West 41 8/15/2024 6 3 4 9 Shortfall of Sites 0.45 Commercial/Resi dential - HVH
P(CG/R4) 50.01 65 22 Non-Vacant Parking
35908027 No Address Crossroads West 42 8/15/2024 11 6 7 18 Shortfall of Sites 0.87 Commercial/Resi dential - HVH
P(CG/R4) 50.01 65 42 Non-Vacant Commercial
35908028 20690 Stevens Creek
Blvd
Crossroads West 43 8/15/2024 11 6 7 17 Shortfall of Sites 0.85 Commercial/Resi dential - HVH
P(CG/R4) 50.01 65 41 Non-Vacant Commercial
32609052 20916 Homestead Rd Homestead Center 44 8/15/2024 11 7 7 19 Shortfall of Sites 0.74 Commercial/Resi dential - VH
P(CG/R4) 65.01 80 44 Non-Vacant Commercial
32609060 20990 Homestead Rd Homestead Center 45 8/15/2024 43 25 26 71 Shortfall of Sites 2.75 Commercial/Resi dential - VH
P(CG/R4) 65.01 80 165 Non-Vacant Commercial
32609061 20956 Homestead Rd Homestead Center 46 8/15/2024 17 10 11 29 Shortfall of Sites 1.12 Commercial/Resi dential - VH
P(CG/R4) 65.01 80 67 Non-Vacant Commercial
36934052 10787 S Blaney Ave Pacific Rim 47 8/15/2024 34 20 21 57 Shortfall of Sites 2.7 Commercial/Resi dential - HVH
P(CG/R4) 50.01 65 132 Non-Vacant Commercial
36937028 10710 S De Anza Blvd Bolinger
Residences
48 8/15/2024 7 4 4 12 Shortfall of Sites 0.56 Commercial/Resi dential - HVH
P(CG/R4) 50.01 65 27 Vacant Vacant/Formerly
Commercial
36619055 1471 S De Anza Blvd Summerwinds 49 8/15/2024 7 4 Shortfall of Sites 0.4 Commercial/Resi dential - MH
P(CG/R3/TH) 20.01 35 11 Non-Vacant Commercial
36619053 1491 S De Anza Blvd Summerwinds 50 8/15/2024 4 2 2 7 Shortfall of Sites 0.56 Commercial/Resi dential - MH
P(CG/R3/TH) 20.01 35 15 Non-Vacant Commercial
36619054 1491 S De Anza Blvd Summerwinds 51 8/15/2024 12 7 7 20 Shortfall of Sites 1.75 Commercial/Resi dential - MH
P(CG/R3/TH) 20.01 35 46 Non-Vacant Commercial
31605050 10989 N Wolfe Rd Cupertino V illage 52 8/15/ 2024 16 9 10 26 Shortfall of Sites 1.02 Commercial/Resi dential - VH
P(CG/R4) 65.01 80 61 Non-Vacant Commercial
31605051 10961 N Wolfe Rd Cupertino V illage 53 8/15/ 2024 9 6 6 16 Shortfall of Sites 0.62 Commercial/Resi dential - VH
P(CG/R4) 65.01 80 37 Non-Vacant Commercial
31605052 10871 N Wolfe Rd Cupertino V illage 54 8/15/ 2024 11 7 7 19 Shortfall of Sites 0.73 Commercial/Resi dential - VH
P(CG/R4) 65.01 80 44 Non-Vacant Commercial
31605053 10833 N Wolfe Rd Cupertino V illage 55 8/15/ 2024 14 9 9 23 Shortfall of Sites 0.92 Commercial/Resi dential - VH
P(CG/R4) 65.01 80 55 Non-Vacant Commercial
31605056 10805 N Wolfe Rd Cupertino V illage 56 8/15/ 2024 108 63 67 178 Shortfall of Sites 6.94 Commercial/Resi dential - VH
P(CG/R4) 65.01 80 416 Non-Vacant Commercial
31605072 11111 N Wolfe Rd Cupertino V illage 57 8/15/ 2024 8 24 Shortfall of Sites 0.54 Commercial/Resi dential - VH
P(CG/R4) 65.01 80 32 Non-Vacant Commercial
35920028 20920 McClellan Rd St. Jude's 58 8/15/2024 5 3 3 9 Shortfall of Sites 0.75 Commercial/Resi dential - MH
P(CG/R3) 20.01 35 20 Non-Vacant Religious Use
Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
Summary Row: Start Data Entry Below
83 Project Identifier RHNA Shortfall by Household Income Category Sites Description 1 Sites Identified or Rezoned to Accommodate Shortfall Housing Need and No Net-Loss Law Table C
Jurisdiction Cupertino
Reporting Year 2024 (Jan. 1 - Dec. 31)
D_1_Name D_2_Objective D_3_Time D_4_Statu s
12 3 4
Name of Program Ob jective Timeframe in H.E Status of Pro gram Implementation Policy HE-1.1 Designate sufficent land at appropriate densities to accommodate Cupertino's Regional Housing Needs Allocation of 4,588 units for the 2023-2031 planning period.
Complete with
adoption
Completed with identification of Priority Housing Sites in 2014/2015 and completion of rezoning in 2019. Housing
Element update to accomodate 6th Cycle RHNA of 4,588 units commenced in October 2021, statutorily required to be
completed by Jan. 31 2023. Initial outreach conducted in 2021.
Expected to be completed by Fall 2023. The Housing Element was adopted in May 2024, with HCD certification in September 2024.The City of Cupertino completed identification of Priority Housing Sites and completed neccesary rezoning to
accomidate the RHNA shortfall of the Housing Element 6th Cycle through a resolution and ordinance passed by City Council in July 2024. The City received certification from HCD in September 2024. Complete as of September 2024.
Policy HE-1.2 Provide a full range of densities for ownership and rental housing. Ongoing Staff will continue to ensure that both ownership and rental housing will be provided at a full range of densities through enforcement of new zoning and development standards during the planning period through the application process. Ongoing.
Policy HE-1.3 Encourage mixed-use development near transportation fac ilities and employment centers. Ongoing Staff will continue to work to encourage mixed-used
development, particularly around frequent transit and business centric corridors, such as Stevens Creek Blvd, through
outreach to employers and commercial property owners.
Ongoing.
HE-1.3.1 Land Use
Policy and Zoning
Provisions
To accommodate the Regional Housing Needs Allocation (RHNA), the City will continue to:
Provide adequate capacity through the Land Use Element and Zoning Ordinance to accommodate the RHNA while maintaining a balanced land use plan that offers opportunities for employment growth, commercial/retail activities, services, and amenities.
Amend development standards for housing as required to provide objective standards that are adequate and appropriate to facilitate a range of housing in the community.
Monitor the sites inventory and make it available on the City’s website.
Annual monitoring
Staff will continue to maintain landuse and zoning policies that accomadate the RHNA allocation of 4,588 units (596 extremely low, 597 very low, 687 low, 755 moderate, and 1,953 above moderate income units). Ongoing
HE-1.3.2 Rezoning to
Achieve RHNA
To ensure that the City has sufficient sites zoned appropriately to achieve the City’s Regional Housing Needs Allocation (RHNA), rezone sites to include 33.52 acres of residential land that will allow for a realistic capacity of 1,855 units, and 32.67 acres of commercial/residential land that will allow for a realistic capacity of 1,727 units.
Permit owner-occupied and rental multifamily uses by right and not require a conditional use permit or other discretionary review or approval for developments in which 20 percent or more of the total units are affordable to lower-income households.
Ensure that each site can accommodate at least 16 units per site and require that all residential development achieve a minimum density of 20 dwelling units per acre on sites designated for lower income housing.
Ensure (a) at least 50 percent of the shortfall of low- and very low-income regional housing need can be accommodated on sites designated for exclusively residential uses, or (b) if accommodating more than 50 percent of the low- and very low-income regional housing need on sites designated for mixed uses, all sites designated for mixed uses must allow 100 percent residential use and require residential use to occupy at least 50 percent of the floor area in a mixed-use project.
Ensure sites will be available for develo
pment during the planning period where water and sewer
Concurent with HE
adoption
Rezoning of 58 priority Housing Sities proposed in the
Housing Element was approved through a public hearing
before the City Council, creating a new capacity upon
those sites of 1,727 units (596 lower, 436 moderate, and 695 above moderate income units). (Resolution 24-039,
Ordinance 24-2262, Ordinance 24-2261). Complete as of
July 2024
HE-1.3.3 New
Residential Zoning
Districts and Land
Use Designations
To ensure the City can meet the RHNA, the following actions will be taken:
Zoning. Create a new R4 Zoning District that will align with the two new General Plan Land Use designations, High/Very High Density allowing 50.01 to 65 units per acre, and Very High Density allowing 65.01 to 80 units per acre. The City will create development standards that will allow the maximum density of this district to be achieved. This will include increased height limits to allow at least three stories, reduced setbacks, reduced lot coverage, and reduced parking requirements.
General Plan Land Use Designations. Create two new General Plan Land Use Designations – High/Very High Density, which will allow for 50.01–65 units per acre, and Very High Density, which will allow for 65.01–80 units per acre. The City will also revise the Commercial/Residential designation to identify different densities at which residential development could occur on property zoned for Residential mixed uses for clarity, and allow 100 percent residential on sites with a General Plan Land Use designation of Commercial/Residential, if the project is affordable.
Concurent with HE
adoption
New zoning distrcits and general plan designations were approved through a public hearing before the City Council, allowing for the new development standards under the
High/Very High Density (50.01 to 65 units per acre) and Very High Density (65.01 to 80 units per acre). (Resolution 24-039, Ordinance 24-2262, Ordinance 24-2261). Complete as of July 2024
HE-1.3.4
Development on
Nonvacent Sites
Establish an outreach and coordination program to connect developers, builders, and owners of nonvacant sites. The program shall:
a. Emphasize reaching out to owners of nonvacant sites to discuss any interest in redeveloping and available incentives.
b. Market and advertise these sites to the development community along with any incentives that might be available.
c. Establish biennial meetings with developers and builders to discuss development opportunities.
If no projects are proposed on non-vacant sites within the first half of Housing Element planning period, the City will provide additional incentives, which will include, but are not limited to:
a. Priority project processing
b. Waive development impact or delay permit fees for affordable units c. Flexibility in development standards, such as parking, setbacks, and landscaping requirements
d. Support grant application requests for funding made by developers for infrastructure upgrades.
e. Assist developers of 100 percent affordable housing developments with securin
g additional financing.
Initiate by June 2024
and maintain
throughout planning
period on a biennial
basis
Staff has begun collaborating with West Valley
jurisdictions to create an annual joint outreach event to connect developers with owners of nonvacant sites and
advertise new housing opportunities under new zoning
regulations. In 2024, outreach began for the first event which is tentatively scheduled to take place in February 2025 to advertise the site at 20140 Stevens Creek Blvd.
More nonvacant sites will be promoted in future events.
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Table D
Program Implementation Status pursuant to GC Section 65583 Jurisdiction Cupertino
Reporting Year 2024 (Jan. 1 - Dec. 31)
D_1_Name D_2_Objective D_3_Time D_4_Statu s
12 3 4
Name of Program Ob jective Timeframe in H.E Status of Pro gram Implementation
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Table D
Program Implementation Status pursuant to GC Section 65583 HE-1.3.5 Encourage
Mixed-Use Projects
and Residential in
Commercial Zones
The City will incentivize development of residential units in mixed-use projects that include affordable units (at least 20 percent), by providing incentives, which will include, but are not limited to:
Priority project processing
Delay payment of development impact or permit fees for affordable units Flexibility in development standards, such as parking, setbacks, and landscaping requirements Support grant application requests for funding made by developers for infrastructure upgrades.
Assist developers of 100 percent affordable housing developments with securing additional financing.
Annual outreach to
developers and
obtain feedback by
January 2025. Adopt
additional
incentives within 6
months of feedback
Promotion of missing mixed use zoning changes will take place during the first annual West Valley developer
outreach event, which is tentatively scheduled to take
place in February 2025. More sites that have high
opportunitiy for mixed-use development will be promoted in future events.
HE-1.3.6 Encourage
Missing-Middle
Housing
Developments to
Affirmatively Further
Fair Housing
The City allow and encourage the development of missing middle housing by:
Allowing corner lots in R1 zoning districts to develop as multi-family rental housing using R2 zoning regulations to encourage missing-middle developments.
Allowing lots zoned for single-family residential uses that abut (either shares a property line or is directly across the street from) property that fronts an arterial or major collector and is zoned and used for commercial or mixed-use development, to develop with rental multi-family housing using R2 zoning regulations to encourage missing middle housing.
Pursuing the establishment of maximum average unit size as a tool to moderate unit sizes for such developments.
The City will promote the missing middle strategy through City publications and online newsletters and via the City ’s website
Complete zoning
code changes by
December 2025,
outreach at least
twice in the
planning period, and
track annual
planning
applications
received
New zoning development standards were approved
through a public hearing before the City Council in July 2024. (Resolution 24-039, Ordinance 24-2262, Ordinance 24 -
2261). Promotion of missing middle housing zoning
changes will take place during the first annual West Valley developer outreach event, which is tentatively scheduled to take place in February 2025.
HE-1.3.7 Lot
Consolidation
The City will help facilitate lot consolidations to combine small residential lots (lots 0.5 acres or smaller) into larger developable lots. The City will continue the following actions to accomplish this:
Facilitate and approve lot consolidation when contiguous smaller, underutilized parcels are to be redeveloped.
Encourage master plans for such sites with coordinated access and circulation.
Provide technical assistance to property owners of adjacent parcels to facilitate coordinated redevelopment where appropriate.
Facilitate intra- and interagency cooperation in working with applicants at no cost prior to application submittal for assistance with preliminary plan review.
Provide information on the City’s website about development opportunities and incentives for lot consolidation to accommodate affordable housing units and discuss these opportunities and incentives with interested developers. As developers/owners interested in lot consolidation and the development of affordable housing projects on small lots approach the City, the City will offer the following incentives:
Allow affordable projects to exceed the maximum height limits, Reduce setbacks,
Reduce parking requirements, and/or
Offset fees (when financially feasible) and offer concurrent/fast tracking of project application Identify incentives
by December 2025.
Offer incentives by
December 2026.
Annual meeting with
local developers.
Incentives for lot consolidated will be identified by
December 2025 and offered by December 2026. Promotion
of lot consolidation zoning changes will take place during the first annual West Valley developer outreach event,
which is tentatively scheduled to take place in February 2025.
HE-1.3.8 Accessory
Dewlling Units
Amend the municipal code to be consistent with the latest State legislation related to ADUs, in accordance with state law.
Continue to provide guidance and educational materials for building ADUs on the City’s website, including permitting procedures. Additionally, the City will biennially present homeowner associations with information about the community and neighborhood benefits of ADUs, and inform them that covenants, conditions, and restrictions prohibiting ADUs are contrary to State law.
To increase mobility for lower income households, proactively advertise the benefits of ADUs by distributing multilingual informational materials in areas of high opportunity and a limited number of renter households to increase mobility for low-income households by posting flyers in community gathering places and providing information to community groups and homeowners’ associations at least annually.
Continue to offer the pre-approved ADU program and post links to approved plans as available.
Annually monitor ADU production and affordability as a part of the Annual Progress Report process and adjust or expand the focus of the education and outreach efforts.
Apply annually, if grants are available, for funding to provide incentives, for homeowners to construct ADUs affordable to very low, low, and moderate-income tenants.
Permit up to a maximum of three, 800 s.f. attached or detached ADUs, JADUs, or conversion ADUs on all single family zoned properties and a maximum of up to two 800 s.f. attached or detached ADUs, JADUs or conversion ADUs on all duplex zoned properties, which is in excess of the number of ADUs allowed under state law.
Identify incentives for construction of affordable ADUs with new development, which may include deferring collection of impact fees for the square footage associated with the ADU until issuance of the certificate of occupancy
Adopt code
amendment and
updated materials
by June 2024.
Explore incentives
by June 2025.
Annual evaluation
by April 2024 and
identify more
incentives within
one year if ADU
targets are not
being met.
The City continues to encourage the production of ADUs.
In 2023, the City issued 50 building permits for ADUs - this is approximately 33% of the total number of ADU building permits issued during the entire 5th Cycle. The ordinance is regularly updated to comply with state law. In 2021, the City developed a pre-approved ADU program to further
incentive the creation of ADUs. One property has utilitzed the pre-approved ADU program since then. New zoning
development standards were approved through a public
hearing before the City Council in July 2024. (Ordinance 24- 2262, Ordinance 24-2261). The City of Cupertino has joined a regional effort in Santa Clara County to use a new survey to collect rent data on new ADUs built to determine
affordability. The survey has been posted to the website and is active as of January 2025. The pre-approved ADU
program continues to be offerred and the program will be monitored as part of the APR. Incentives will be explored by June 2025. Grants will be applied to to provide as ADU production incentives as opportunities become available.
In 2024, 41 ADU building permits were issued and 46 ADUs received certificates of occupancy.
Jurisdiction Cupertino
Reporting Year 2024 (Jan. 1 - Dec. 31)
D_1_Name D_2_Objective D_3_Time D_4_Statu s
12 3 4
Name of Program Ob jective Timeframe in H.E Status of Pro gram Implementation
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Table D
Program Implementation Status pursuant to GC Section 65583 HE-1.3.9 Review
Development
Standards
The City will review and revise its zoning code to:
Review and revise design and development standards and guidelines for multifamily housing, specifically in the R4 Zone and the Priority Development Area to ensure standards are objective and that maximum densities can be achieved.
Provide flexibility in development standards to accommodate new models and approaches to providing housing, such as live/work housing to allow housing to adapt to the needs of occupants.
Offer flexible residential development standards in planned residential zoning districts, such as smaller lot sizes, lot widths, setbacks, and higher floor area ratios particularly for higher-density and attached housing developments.
Consider granting reductions in off-street parking for senior housing. Analyze local parking standards compared to those of neighboring jurisdictions with similar characteristics and reduce parking standards to ensure parking is not a constraint on development. Specifically, reduce parking requirements for studio apartments, senior housing, and singleroom occupancy units and others as required by the analysis.
Require implementation of universal design standards for new multifamily development to provide disabled access. These standards would require the adoption of features like at least one “no-step” entry point, interior and exterior doors with 32 inches of clear passage, and one bathroom on the main floor that is able to be maneuvered in a wheelchair. Encourage the implementation of universal design standards for new single-family homes.
Remove text from the major development permit findings requiring the project to not be detrimental or injurious to property or improvements in the vicinity and or others convenience Analyze parking
standards by
December 2024 and
revise by June 2025.
Annually review
objective design
standards.
New zoning development standards were approved
through a public hearing before the City Council in July 2024. (Resolution 24-039, Ordinance 24-2262, Ordinance 24 -
2261). On May 2024, The City entered into a contract with the consultant, PlaceWorks, to draft and implement
objective design standards. After implementation, the
policy will be annually reviewed for effectiveness through the APR.
HE-1.3.10 Innovative
and Family-Friendly
Housing Options
Explore innovative and alternative housing options that provide greater flexibility and affordability in the housing stock that would address housing needs for intergenerational households, students, special-needs groups, and lower-income households.
The City will implement the following:
Promote housing designs and unit mix to attract multigenerational households by encouraging housing features and more bedrooms (including four-bedroom units), as well as other on-site amenities, such as usable outdoor open space for multigenerational use to promote placebased revitalization, and multipurpose rooms that can be used for afterschool homework clubs, computer, art, or other resident activities. Facilitate at least one partnership with social service organizations to provide programming in community spaces within a 100 percent affordable project during the planning period.
Research the possibility of a Home Sharing program that would help to match “providers” with a spare room or rooms with “seekers” who are looking for an affordable place to live. This could either be done at a countywide level or the City could consider partnering with De Anza Community College to facilitate a home-sharing program to account for the high number of empty rooms across Cupertino’s single-family home supply. If the program is determined to be feasible, implement within one year of feasibility determination. Priority outreach for program implementation will focus on the city’s lower-density neighborhoods.
The City will use the findings of this program to target development of a variety of housing types in areas of concentrated overpayment to reduce displacement risk as well as promote inclusion and support integration of housing types based on income to facilitate mobility opportunities in Amend zoning code
by October 2024.
Explore alternative
options by
December 2025.
New zoning development standards were approved
through a public hearing before the City Council in July 2024. (Resolution 24-039, Ordinance 24-2262, Ordinance 24 -
2261). Staff will reach out to HIP Housing to explore the possibility of expanding the Homesharing Program to
Santa Clara County (or just the City of Cupertino) by
December 2025.
HE-1.3.11
Replacement
Housing
To facilitate place-based revitalization for households at risk of displacement due to new development, the City will require replacement housing units subject to the requirements of state law on all sites in the City when any new development (residential, mixed-use, or nonresidential) occurs on a site that has been occupied by or restricted for the use of lower-income households at any time during the previous five years. This requirement applies to nonvacant sites and vacant sites with previous residential uses that have been vacated or demolished.
Ongoing as projects
are proposed.
Staff will continue to monitor development projects to
ensure that replacement units are required when
residential units are demolished. Ongoing.
HE-1.3.12 Track
Housing Production
The City will monitor housing production throughout the planning period and ensure the Pipeline Projects and sites identified to meet the RHNA maintain sufficient housing capacity to meet the RHNA target by income level. The city will not adopt reductions in allowable residential densities for Pipeline Projects in the Housing Element through General Plan update/amendment or rezone or approve development or building permits for sites identified in the inventory with fewer units or affordable to a different income category than identified in the inventory, unless findings are made that the remaining capacity is sufficient to accommodate remaining unmet RHNA for each income level. The City will track and report on:
Pipeline projects and progress towards completion;
Unit count and income/affordability assumed on parcels in the sites inventory; Actual number of units permitted and constructed by income/affordability; Net change in capacity and summary of remaining capacity by income level in meeting remaining RHNA;
In accordance with No Net Loss law, if project approval results in the remaining sites capacity becoming inadequate to accommodate RHNA by income category, the City will identify or rezone sufficient sites to accommodate the shortfall within 180 days of approval. Further, the City will track progress of pending projects towards completion and if projects are not assumed to be completed in the planning period, the City will evaluate whether there are sufficient sites available to accommodate the RHNA. If sufficient sites are not available, the City will take necessary actions (e.g., rezoning or identify additional sites) to maintain adequate sites within one year. The results of the tracking will be reported in the Housing Element Annual Progress Report reported annually to the City Council and posted online for public review.
Ongoing as projects
are proposed.
Annual review in
tracking.
Staff will continue to monitor development projects to
ensure that they are built to unit and income levels as proposed in the housing element in accordance with No
Net Loss Law. Ongoing.
HE-1.3.13 Housing
Element Monitoring
and General Plan
Consistenc
y
As required by State law, the City will review the status of Housing Element programs annually.
Annual review will cover consistency between the Housing Element and the other General Plan Elements. As portions of the General Plan are amended, the Housing Element will be reviewed and revised to ensure that internal consistenc
y is maintained.
Ongoing as the
Elements and
General Plan are
u
pdated.
Staff will continue to review elements of the General Plan to ensure their internal consistency, including the Housing Element. Ongoing.
Jurisdiction Cupertino
Reporting Year 2024 (Jan. 1 - Dec. 31)
D_1_Name D_2_Objective D_3_Time D_4_Statu s
12 3 4
Name of Program Ob jective Timeframe in H.E Status of Pro gram Implementation
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Table D
Program Implementation Status pursuant to GC Section 65583 Policy HE-2.1 Ensure that all new developments, including market-rate residential developments, help mitigate project related impacts on affordable housing needs. Ongoing
Implemented via Municipal Code and BMR Manual. Staff will continue to ensure that all new development mitigate project related impacts on affordable housing needs through the application review process and collection of related fees.
Ongoing.
Policy HE-2.2
Encourage the development of diverse housing stock that provides a range of housing types (including smaller, moderate-cost housing) and affordability levels. Emphasize the provision of housing for lower and moderate-income households, including wage earners who provide essential public services (e.g. school district employees, municipal and public safety employees, etc.) Ongoing
Staff will continue to encourage the development of housing at all affordability levels through the release of an annual BMR notice of funding availability and through enforcement of the inclusionary housing policy of the Housing Mitigation Manual during the application review process. In 2024, staff continues to review the application for the Vallco/The Rise project, which is projected to produce 2,669 units, with 134 very-low income units and 756 low income units. Ongoing.
Policy HE-2.3
Make every reasonable effort to disperse affordable units throughout the community but not at the expense of undermining the fundamental goal of providing affordable units. Ensure that the City's development standards accommodate housing needed by persons with special needs.
Ongoing
Staff will continue to make every reasonable effort to dispurse affordable units throughout the City to Affirmatively Further Fair Housing by requiring inclusionary housing as part of market rate housing as they develop around the City. In addition, durin
g development of the City's priority housing sites inventory, the City evaluated sites through a diverse selection of neighborhoods to avoid creating areas of housing segregation while maintianing the fundamental priority of providing affordable housing units and ensuring that development
standards accomodate persons with special needs. Ongoing.
HE-2.3.1 Support
Affordable Housing
Development
Prioritize projects that are in areas with currently low percentages of renter-occupied households to facilitate housing mobility and integration of ownership and rental units. Additionally, prioritize projects in areas with high rates of
housing cost burden.
Support affordable housing development and give priority to permit processing for projects providing 100 percent affordable housing for special-needs groups throughout the city, including in areas that are predominantly single-family residential. The target populations include seniors; persons with disabilities, including developmental disabilities; female-headed households; and persons experiencing homelessness to reduce the displacement risk for these residents from their existing homes and communities.
Promote the use of the density bonus ordinance, application process streamlining, fee deferrals, and consider development fee exemption for projects that are 100 percent affordable to encourage affordable housing, with an emphasis on encouraging affordable housing in high- resource areas and areas with limited rental opportunities currently.
Facilitate the approval process for land divisions, lot line adjustments, and/or specific plans or master plans resulting in parcel sizes that enable 50 percent affordable housing development and process fee deferrals related to the subdivision for 50 percent affordable projects.
Work with public or private sponsors to identify candidate sites for new construction of housing for special needs, including transitional and supportive households, and take all actions necessary to expedite processing of such projects.
Encourage residential development near transit routes, civic uses, social services, grocery stores, parks, open space, and other health resources.
Partner with nonprofit and for-profit affordable housing developers to support their financing applications for State and federal grant programs, tax-exempt bonds, and other programs that become available.
Pursue federal, State, and private funding for low- and moderate-income housing by applying for State and federal monies for direct support of lower-income housing construction and rehabilitation, specificall
y for development of housing affordable to extremely low-income Ongoing as projects
are proposed.
Annually apply for
state/federal funds
as projects become
available.
Staff will continue to review and prioritize the development of affordable housing as opportunities become available. In 2024, no projects were ready to receive state/federal
assistance, however, staff identified the PLHA and
HomeKey+ grants as potential sources for the future Mary Ave Affordable Housing Project. Ongoing.
HE-2.3.2 Office and
Industrial Housing
Mitigation Program
The City will continue to implement the Office and Industrial Housing Mitigation Program. This program requires that developers of office, commercial, and industrial space pay a mitigation fee, which will then be used to support affordable housing in Cupertino. These mitigation fees are collected and deposited in the City’s Below Market-Rate Affordable Housing Fund.
Ongoing as projects
are proposed.
Housing Mitigation Manual updated in May 2024, to require BMR units with projects over 5 units. The City requires developers of office, commercial, and industrial space to pay a mitigation fee to support affordable housing.
Mitigated fees are collected and deposited into the City's BMR Affordable Housing Fund (AHF) for the following
fiscal years (FY) the following mitigation fees were
collected and deposited and in the BMR AFH fund. In 2023, there was $175,873.48 in BMR AHF funds collected. In
2024, no funds were collected in BMR AHF funds from the Office and Industrial Housing Mitigation Program. Staff will continue to collect mitigation fees to add to the City's Below Market Rate Affordable Housing Fund as
development pro
jects are submitted. Ongoing.
Jurisdiction Cupertino
Reporting Year 2024 (Jan. 1 - Dec. 31)
D_1_Name D_2_Objective D_3_Time D_4_Statu s
12 3 4
Name of Program Ob jective Timeframe in H.E Status of Pro gram Implementation
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Table D
Program Implementation Status pursuant to GC Section 65583 HE-2.3.3 Residential
Housing Mitigation
Program
The City will continue to implement the Residential Housing Mitigation Program to mitigate the need for affordable housing created by new market-rate residential development. The BMR program specifies the following:
Priority. To the extent permitted by law, priority for occupancy is given to Cupertino residents, Cupertino full-time employees, and Cupertino public service employees, as defined in Cupertino’s Residential Housing Mitigation Manual.
For-Sale Residential Developments. Require 20 percent for-sale BMR units in all residential developments where the units can be sold individually (including single-family homes, common interest developments, and condominium conversions) or allow rental BMR units.
Rental Residential Developments. Require 15 percent very low- and low-income BMR units in all rental residential developments.
Rental Alternative. Allow rental BMR units in for-sale residential developments and allow developers of market-rate rental developments to provide on-site rental BMR units, if the developer: (1) enters into an agreement limiting rents in exchange for a financial contribution or a type of assistance specified in density bonus law; and (2) provides very low-income and low- income BMR rental units.
Affordable Prices and Rents. Continue to implement guidelines for affordable sales prices and affordable rents for new affordable housing and update the guidelines each year as new income guidelines are received.
Development of BMR Units Off Site. Allow developers to meet all or a portion of their BMR or Housing Mitigation fee requirement by making land available for the City or a nonprofit housing developer to construct affordable housing or allow developers to construct the required BMR units off site, in partnership with a nonprofit. The criteria for land donation or off-site BMR units will be identified in the Residential Housing Mitigation Manual.
BMR Term. Require BMR units to remain affordable for a minimum of 99 years; enforce the City’s first right of refusal for BMR units and other means to ensure that BMR units remain affordable.
Monitor the affordable for-sale inventory by requiring BMR homeowners to submit proof of occupanc
y, such as utility bills, mortgage loan documentation, homeowner’s insurance, and Ongoing as projects
are proposed.
Monitor the program
annually. Conduct
economic study if it
appears to be a
constraint and make
changes within one
year.
The City has not heard any concerns about its BMR
program being a constraint to development at this time and is not required to prepare an economic feasibility report at this time. Staff will continue to implement the housing mitigation program to ensure market developments include affordable units as a portion of housing units provided.
Revisions will be made to the mitigation program
guidelines to allow alternatives ways to satisfy BMR
requirements as neccesary. The program and any
subsequent changes will be monitored through tracking of housing production in the APR. In 2024, staff continues to review the application for the Vallo/The Rise project, which is projected to produce 2,669 units, with 134 very-low
income units and 756 low income units. Ongoing.
HE-2.3.4 Below
Market-Rate (BMR)
Affordable Housing
Fund (AHF)
The City’s BMR AHF will continue to support affordable housing projects, strategies, and services, including, but not limited to:
BMR Program Administration
Substantial rehabilitation
Land acquisition
Acquisition and/or rehabilitation of buildings for permanent affordability New construction
Preserving “at-risk” BMR units
Rental operating subsidies
Down payment assistance
Direct gap financing
Fair housing
The City will target a portion of the BMR AHF to benefit extremely low income households and persons with special needs (such as the elderly, victims of domestic violence, and the disabled, including persons with developmental disabilities), to the extent that these target populations are found to be consistent with the needs identified in the nexus study the City prepares to identify the connection, or “nexus” between new developments and the need for affordable housing.
Additionally, development of housing for lower income households will be facilitated citywide, but priority will be given to areas with currently low percentages of renter-occupied households to facilitate housing mobility and integration of ownership and rental units. Additionally, priority will also be given to areas with high rates of cost burden.
Annual publication
of a Request for
Proposals. Ongoing
as applicants for
BMR funding are
received.
Staff will continue to annual publish a Request for
Proposals for the Below Market Rate Affordable Housing
Funds and will review applications to ensure that they
meet the fund guidelines and further the City's affordable housing goals. In 2024, approximately $4.8 million dollars have been made available. Projects which include ELI units or are geographically located in areas with low
percentages of renter-occupied households or areas with high rates of cost burden will be prioritized. In 2024, this NOFA was released in November and anticipates
receiveing two applications: the Mary Ave Affordable
housing project, which is planned to produce 40 units, with 19 very low-income units, 20 extremely low-income units, and 1 manager unit. Within the affordable unit mix, 19 units will be reserved for individuals with intellectual or
developmental disabilities; and the Wolf Rd Educator
housing project, with is planned to produce 249 units built across two phases. The first phase will contain 101 units of mixed-income housing for school district employees, will contain approximately 34 low income units and 67
moderate income units. The second phase will contain 148 units, with 60 very low-income units, 86 low-income units, and 2 manager units Ongoing
HE-2.3.5 Housing
Resources
Cupertino residents and developers interested in providing affordable housing in the city have access to a variety of resources administered by other agencies. The City will continue to provide information on housing resources and services offered by the County and other outside agencies. These include, but are not limited to:
Mortgage Credit Certificate (MCC) – Santa Clara County Housing and Community Development Department.
First-Time Homebuyer Assistance and Developer Loans for Multifamily Development - Housing Trust Silicon Valley (HTSV).
Housing Choice Vouchers (Section 8) - Housing Authority of Santa Clara County (HASCC).
Affordable housing development - Santa Clara County HOME Consortium.
The City will also continue to identify and pursue various affordable housing resources available at the local, regional, state, and federal levels that could be used to address housing needs in the community. Outreach on these programs will be conducted citywide, but extra focus will be given to areas with historically higher areas of income segregation Annually identify
and pursue housing
resources as
opportunities
become available.
Update the website
as needed.
Information and technical assistance continues to be
provided by City Staff and Rise Housing Solution, BMR
program administrator. Staff will continue to research and pursue housing funds from federal, state, and regional
sources to support affordable housing and provide
relevant information to residents through the City website as projects become available. Ongoing.
Jurisdiction Cupertino
Reporting Year 2024 (Jan. 1 - Dec. 31)
D_1_Name D_2_Objective D_3_Time D_4_Statu s
12 3 4
Name of Program Ob jective Timeframe in H.E Status of Pro gram Implementation
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Table D
Program Implementation Status pursuant to GC Section 65583 HE-2.3.6 Surplus
Properties for
Housing and Faith-
Based Housing
The City will partner with local developers or organizations to purchase surplus properties, infill lots, and other green fields within the city to use for the development of affordable housing.
Encourage mixed-use development as a pull factor for individuals to live in the new development as follows:
Work with local public agencies, school districts, and churches to identify surplus properties or underutilized properties that have the potential for residential development.
Compile and maintain an inventory of vacant properties owned by the City or other public entities.
The inventory will include land donated and accepted by the City for donation, and land otherwise acquired by the city.
The City will then undertake steps leading to release of RFP to solicit developer interest, which may include declaration of land as ‘surplus’. The City will publicize the inventory, post it on the website, make it available to non-profit developers, and prioritize affordable housing on these sites in accordance with the Surplus Lands Act. To create housing mobility opportunities for lower-income households, conduct outreach to religious institutions to inform them of their development rights under SB 4 and encourage housing proposals within one year of Housing Element adoption. If no application for housing on a religious institution/faith-based site is received within twelve months after outreach is completed, the City will expand outreach efforts to be conducted annually. This will include direct mailings to faith-based sites highlighting successful affordable housing units on other faith-based sites, as well as available City resources and programs to support such projects if available. Additional outreach focus will be given to religious institutions located in lower-density neighborhoods to promote housing mobility in these areas.
Encourage long-term land leases of properties from churches, school districts, and corporations for construction of affordable units.
Evaluate the feasibility of developing special housing for teachers or other employee groups on the surplus properties.
Research other jurisdictions’ housing programs for teachers for their potential applicability in Cupertino
Update surplus City
properties list within
one year of
adoption. Send RFP
in compliance with
Surplus Lands Act.
Meet with affordable
housing developers
biennially. Outreach
to faith-based
groups within one
year of adoption
and if new
legislation is
adopted. If no
applications by
December 2025,
annual outreach.
The City worked with local public agencies, school
districts, and churches to identify surplus properties that have the potential for residential development during the Housing Element update between 2021 and 2023. There
were no surplus properties available from any school
districts for the City to pursue. The City continued to support the Rotating Safe Car Park (RSCP) program on
church property. The City has seen an interest from St.
Jude's Church for a development of a portion of their
property with affordable housing. The City has rezoned
this property to accommodate the development that they
envision as part of the 6th Cycle Housing Element update.
Staff will maintain a list of surplus City properties that will updated annually in accordance with Table H of the APR.
Staff will resume outreach to other faith based
organizations in 2025.
HE-2.3.7 Incentives
for Affordable
Housing
Development
The City will continue to offer a range of incentives to facilitate the development of affordable housing. These include:
Financial assistance through the City’s Below-Market Rate Affordable Housing Fund (BMR AHF) and Community Development Block Grant (CDBG) funds.
Partner with CDBG and/or support the funding application of qualified affordable housing developers for regional, state, and federal affordable housing funds, including HOME funds, Low- Income Housing Tax Credits (LIHTC), and mortgage revenue bonds.
Density bonus incentives
Flexible development standards
Technical assistance.
Waiver of park dedication fees and construction tax
Parking ordinance waivers
Expedited permit processing
Development of housing for lower-income households will be facilitated citywide, but extra focus will be given to areas with currently low percentages of renter-occupied households to facilitate housin
g mobility and integration of ownership and rental units. Additionally, focus will be given to Annually review
incentives and
publish RFPs. If
additional
incentives are
needed, adopt
within one year.
Staff will continue to publish RFPs for affordable housing funds and annaully review incentives provided to
encourage affordable housing development. Projects
which include ELI units or are geographically located in areas with low percentages of renter-occupied households or areas with high rates of cost burden will be prioritized.
Ongoing.
HE-2.3.8 Density
Bonus Ordinance
The City will continue to review and revise the Zoning Code to be consistent with State density bonus law. Although most housing developers are familiar with density bonus law and frequently request bonuses, concessions, waivers, and parking reductions, the city will provide available guidelines and other information to developers regarding the statute. The City currently allows a 100% bonus for all affordable housing developments.
Update ordinance
by June 2025.
Annually review and
revise as needed.
Every housing development with more than 5 units has
utilitzed Density Bonus, waivers, incentives and parking reductions in some capacity. Staff will continue to review and revise the zoning code to be consistent with State
density bonus law. Ongoing.
HE-2.3.9 Review
Impact Fees
To ensure that impact fees are not a constraint on the development of housing, the City will:
Review and revise impact fees by researching surrounding jurisdictions to determine other possible fee structures, grant funding opportunities and similar funding sources, review of average persons per unit at higher densities of development and will consider:
Alternatives, such as privately owned, publicly accessible (POPA) areas, or allowing parkland credit for pedestrian connections and trails.
Incorporating priority processing, granting fee waivers or deferrals for 100 percent affordable projects, and modifying development standards.
Review impact fee
by December 2025,
revise if needed by
June 2026.
Staff already grants impact fee and construction tax
waivers for all affordable units (whether the development is 100% affordable or not). It is the City's policy to continue to prioritize 100% affordable houring projects. All 100% affordable housing projects are eligible for state density bonus waivers, which allow the waivers of ALL
development standards. Additionally, many parts of the
City allow unlimited density due to proximity to major
transity stops. Therefore, almost no development
standards apply to such projects nor are such projects
subject to the payment of any parkland fees in lieu of
dedication. For projects which are not 100% affordable, the City will review parkland fees in lieu of dedication in 2025 to consider credit for public pedestrian connections or trails on the property and/or POPA areas or other
alternatives.
Jurisdiction Cupertino
Reporting Year 2024 (Jan. 1 - Dec. 31)
D_1_Name D_2_Objective D_3_Time D_4_Statu s
12 3 4
Name of Program Ob jective Timeframe in H.E Status of Pro gram Implementation
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Table D
Program Implementation Status pursuant to GC Section 65583 HE-2.3.10 Extremely
Low-Income Housing
The City will continue to encourage the development of adequate housing to meet the needs of extremely low-income households particularly for seniors, victims of domestic violence, and persons with disabilities (including persons with developmental disabilities), through a variety of actions. The development of housing for extremely low-income households will be facilitated citywide, but priority will be given to areas with currently low percentages of renteroccupied households to facilitate housing mobility and integration of ownership and rental units.
Additionally, priority will be given to areas with high rates of housing cost burden.
Provide financing assistance using the BMR AHF and CDBG funds.
Review available State and Federal NOFAs on an annual basis and support funding applications for affordable housing projects as funding becomes available.
Adopt a priority processing procedure for projects with extremely lowincome units within one year of Housing Element adoption.
Grant reductions in off-street parking as required by density bonus law and other state statutes.
Expand regulatory incentives for the development of units affordable to extremely low-income households and housing for special-needs groups, including persons with disabilities (including developmental disabilities), and individuals and families in need of emergency/transitional housing. The City will work with developers and evaluate additional proposed development standards reductions for projects that include housing for extremely low-income households, and will present findings and proposed code amendments to the Planning Commission and City Council for adoption within nine months of identified findings.
Partner with and/or support the funding application of qualified affordable housing developers for regional, state, and federal affordable housing funds, including HOME funds, LIHTC, and mortgage revenue bond.
Amend the Zoning Code to define single-room occupancy (SRO) units and allow them in the R4 zoning districts with a use permit, in compliance with state law.
Adopt zoning code
amendments within
9 months of
findings. Conduct
outreach by
December 2024.
Annually inform
developers of
findings.
New zoning development standards were adopted in July
2024 to address SROs and processing. (Ordinance 24-
2262, Ordinance 24-2261). The NOFA for the City's BMR
AHF fund was issued in November 2024. All projects which include ELI units will be prioritized as identified in the Housing Element. Processing for projects with affordable units are streamlined and codified in the zoning code. The City anticipates hosting a developer outreach event in
early 2025 in partnership with other cities to promote the use of development incentives for projects which contain ELI units, such as waivers and concessions. The City also anticipates discussing the availability of Density Bonus waivers and incentives for developments with affordable units and offering support for qualifying funding
applications. It is anticipated an opportunity site with proximity to services, including West Valley Community
Services, which is well suited for ELI units, will be
promoted.
HE-2.3.11 Assistance
for Persons with
Developmental
Disabilities
To increase housing mobility opportunities and support persons with developmental disabilities, the City will:
Provide referrals to the San Andreas Regional Center to inform families with persons with developmental disabilities of the resources available to them.
Continue to support the development of small group homes that serve developmentally disabled adults; adopt a policy to establish priority processing and offer fee waivers or deferrals within one year of Housing Element adoption.
Work with the nonprofit community to encourage the inclusion of units for persons with developmental disabilities in future affordable housing developments.
Encourage housing providers to pursue funding sources designated for persons with special needs and disabilities and notify housing providers of available funding opportunities as they become available. Offer technical assistance to project developers on funding applications.
Encourage housing providers to designate a portion of new affordable housing developments for persons with disabilities, including persons with developmental disabilities, to increase housing mobility opportunities and pursue funding sources designated for persons with special needs and disabilities.
Adopt priority
processing and fee
deferrals within one
year of adoption.
Meet with providers
by December 2024.
Annually coordinate
with regional
offices.
The City anticipates hosting a developer outreach event in early 2025 in partnership with other cities to promote the use of development incentives for projects which contain IDD units, such as Density Bonus waivers and
concessions. The City also anticipates offering support for qualifying grant funding applications. It is anticipated an opportunity site with proximity to services, including West Valley Community Services, which is well suited for IDD units, will be promoted. Outreach for the event began
December 2024. The City continues to support and
encourage the development of housing for persons with
developmental disabilities through the Mary Ave Affordable Housing project, which will contain 19 units for IDD
households. In 2024, staff has continuously met with the developer, Charities Housing, and committed funding to
the predevelopment of anticipated affordable housing
projects such as Mary Ave and Simeon (Eden Housing) in
2021 and reaffirmed the commitment in 2024.
HE-2.3.12 Live/Work
Units
Encourage the development or conversion of affordable live/workspace units to reduce displacement of residents and employees, specifically when replacing older strip mall type developments along busier streets to preserve the more urban and mixed-use character of the street. This would allow the street frontage to remain commercial use while the residential portion of the units would be located towards the rear of the site or in upper floors. The City will also help to market the Homeownership Assistance Programs offered by Housing Trust Silicon Valley (HTSV) in an effort to expand affordable homeownership options.
Conduct outreach
by June 2025, adopt
zoning amendments
if neccesary by
December 2025.
Annually monitor
applications and
modify if needed.
Staff will conduct outreach to commercial property owners in 2025. The City will continue to help advertise
Homeownership Assistance Programs offered by HTSV
through the City website.
Policy HE-3.1
Pursue and/or provide funding for the acquisition/rehabilitation of housing that is affordable to very low, low, and moderate income households. Actively support and assist nonprofit and for-profit developers in producing affordable units.
Ongoing
Staff will continue to release an annual notice of funding available for both local BMR funds as well as federal CDBG funds, and make avilalbe HOME, as well as state PLHA funds, to provide fundin
g to maintain existing affordable housing stock.
Ongoing.
Policy HE-3.2 Assist lower-income homeowners and rental property owners in maintaining and repairing their housing units. Ongoing
In 2024, CDBG funds were provided to the non-profit
organization, Rebuilding Together Silicon Valley, in the amount of $92,536 to provide rehabilitation services to low-income homeowners in the City of Cupertino., which served 9
households. Ongoing.
Policy HE-3.3
The City's existing multifamily units provide opportunities for households of varied income levels.
Preserve existing multifamily housing stock, including existing duplexes, triplexes, and fourplexes, by preventing the net loss of multifamily housing units upon remodeling, with new development and the existing inventory of affordable housing units that are at risk of converting to market-rate housing.
Ongoing
Staff will continue to make funding available for the
conservation of affordable housing units at risk of converting to market rate housing through using BMR, CDBG, HOME, and
PLHA programs through deed restriction via rehabilitation and conversion. Ongoing.
HE-3.3.1 Residential
Rehabilitation
The City will continue to:
Use its BMR AHF and CDBG funds to support residential rehabilitation efforts in the community.
These include:
Acquisition/rehabilitation of rental housing.
Rehabilitation of owner-occupied housing.
Provide assistance for home safety repairs and mobility/accessibility improvements to income- qualified owner-occupants using CDBG funds. The focus of this strategy is on the correction of safety hazards.
Partner with and/or support the funding application of qualified affordable housing developers for regional, state, and federal affordable housing funds, including HOME funds, LIHTC, and mortgage revenue bonds
Ongoing as projects
are proposed.
Staff will continue to support residential rehabilitation of low-income homes in partnership with Rebuilding Together Silicon Valley through financial support in the CDBG
program. In 2024, $92,536 was provided to this program
and 9 households were served. Ongoing.
Jurisdiction Cupertino
Reporting Year 2024 (Jan. 1 - Dec. 31)
D_1_Name D_2_Objective D_3_Time D_4_Statu s
12 3 4
Name of Program Ob jective Timeframe in H.E Status of Pro gram Implementation
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Table D
Program Implementation Status pursuant to GC Section 65583 HE-3.3.2 Preservation
of At-Risk Housing
Units
Beardon Drive (8 units), WVCS Transitional Housing (4 units), and Sunny View West (100 units), as well as several below-market rate (BMR) units are considered at risk of converting to market- rate housing in the next 10 years. For units at risk of converting to market rate, the City shall:
Contact property owners of units at risk of converting to market-rate housing three years before affordability expiration to discuss the City’s commitment to preserve these units as affordable housing.
Coordinate with owners of expiring subsidies to ensure the required notices to tenants and to affordable housing developers are sent out at 3 years, 12 months, and 6 months or otherwise as required by state law.
Reach out to agencies and to nonprofit housing developers interested in purchasing or otherwise preserving at-risk units.
Work with tenants and other organizations to reduce displacement and refer residents to an agency that can assist in providing alternative housing, if preservation is not possible. Ensure that tenants have received all required notices and other information regarding conversion procedures.
The City will further monitor its affordable for-sale inventory by ordering title company lot books, reviewing property profile reports, and updating its public database annually.
The City will monitor its affordable rental inventory by verifying proof of occupancy and performing annual rental income certifications for each BMR tenant. To help further preserve the City’s affordable housing stock the City may consider providing assistance to rehabilitate and upgrade the affordable units as well.
Ongoing, conduct
outreach to property
owners 3 years
prior to expiration of
contracts as
needed.
Staff will continue to reach out to property owners as their affordable units approach the 3 years, 12 months, and 6 months deadlines to ensure that proper noticing is sent out to tenants informing them of ther affordability restrictions of their unit expiring. Whenever possible, staff will work with nonprofit housing developers to preserve unit
affordability. Staff was able to extend the affordability restriction of Greenwood Ct Apartments to 2116. Staff has confirmed in 2025 that the 8 units at the Beardon Dr
Apartments continue to be offered at affordable rents
despite affordability restriction expiring. Aviare, Forge Homestead, and Park City Center were contacted by staff to ensure proper noticing procedures were followed. When it was determined that for some properities, that the proper procedures were not followed, the affordability restriction was extended until proper noticing was sent, per state law.
Ongoing.
HE-3.3.3
Condominium
Conversions
The existing Condominium Conversion Ordinance regulates the conversion of rental units in multifamily housing development to preserve the rental housing stock. Condominium conversions are not allowed if the rental vacancy rate in Cupertino and certain adjacent areas is less than 5 percent at the time of the application for conversion and has averaged 5 percent over the past six months. The City will continue to monitor the effectiveness of this ordinance in providing opportunities for homeownership while preserving a balanced housing stock with rental housing.
Annually monitor
ordinance and as
projects are
proposed.
The City continues to monitor the effectiveness of this ordinance by providing opportunities for homeownership
while preserving a balanced housing stock with rental
housing. Staff will continue to monitor the balance and growth of rental and ownership housing annually through the APR and will consider the effectiveness of the
Condominium Conversion Ordinance. Ongoing.
HE-3.3.4 Housing
Preservation
Program
When a proposed development or redevelopment of a site would cause a loss of multifamily housing, the City will grant approval only if:
The project will comply with the City’s Below Market Rate Housing Mitigation Program Procedural Manual;
The number of units provided on the site is at least equal to the number of existing units; Adverse impacts on displaced tenants, in developments with four or more units, are mitigated; and
The project replaces existing units at the same or deeper affordability, with the same number of bedrooms and bathrooms, and comparable square footage to the units demolished and provides displaced tenants with right of first refusal to rent new comparable units at the same rent as demolished units.
The City will review the program biannually and revise as needed; if revisions are needed, they will be adopted within one year of determination of need. In addition, indirect displacement may be caused by factors such as increased market rents as areas become more desirable. The City will participate, as appropriate, in studies of regional housing need and displacement, and consider
policies or programs to address the indirect displacement of lowerincome residents as Ongoing as projects
are proposed.
Review program
biennially.
The City must comply with state law and federal
requirements on relocation assistance to displaced
tenants as projects are proposed/constructed. Staff will continue to review and approve development applications only if the number of housing units proposed is greater than the existing count and that any adverse impacts on displaced tenants are mitigated in accordance with No Net Loss provisions. The program will be reviewed bienually.
Ongoing.
HE-3.3.5 Park Land
Ordinance
The City will review and revise its Park Land Ordinance to reduce any potential constraints on residential development while maintaining access to quality open space. The City will review requirements for higher-density projects and evaluate the possibility of open space credits.
Review by
December 2025,
revise by June 2026.
Staff will review the Park Land Ordinance in 2025.
HE-3.3.6 Tenant
Protections
Study rent stabilization and tenant protection ordinances in California and displacement in Cupertino due to rising rents and evictions. Work with relevant stakeholders to establish tenant protection and/or a rent stabilization to ensure protection for renters, as appropriate based on findings.
Complete study by
December 2024,
implement
ordinance by June
2025.
Throughout development of the Housing Element, staff
was directed by City Council to address anti-displacement for tenants of BMR units with expiring affordability
covanents as a high priority. In December 2024, staff
completed a study session during a Special Meeting of the Housing Commission to develop an anti-displacement
policy to address the needs of households in expiring BMR rental units. This will include two components: the creation of an Anti-Displacement priority waitlist in the BMR
program, and relocation payment assistance to displaced households in the amount of 3 months of fair market rent.
A proposed ordinance will be presented to the City Council for its consideration by mid-2025. Additional actions such as rent stabiliazation and transparency for deposit charges will continue to be studied as part of a larger Anti-
Dis
placement Strategy for all renters.
HE-3.3.7 Monitor
Nongovernmental
Constraints
Monitor Nongovernmental Constraints Impeding Residential Development. The City will monitor residential developments that have been approved by the City and where building permits or final maps have not been obtained, the City will make diligent efforts to contact applicants to discover why units have not been constructed within two years after approval. If due to nongovernmental constraints, such as rapid increases in construction costs, shortages of labor or materials, or rising interest rates, to the extent appropriate and legally possible, the City will seek to identify actions that may help to reduce or remove these constraints. Additionally, the City will proactively work with stakeholders to identify nongovernmental constraints or other considerations that may impede the construction of housing in Cupertino and work collaboratively to find strategies and actions that can eliminate or reduce identified constraints.
Ongoing, monitor
two years after
project approvals.
Staff will continue to monitor approved developments and work with developers to remove any nongovernmental
constraints which may be impeding completion. Feedback
from developers on constraints to development will be
solicited during the outreach event anticipated in early 2025.
Policy HE-4.1 Encourage energy and water conservation in all existing and new residential development. Ongoing Staff will continue to ensure energy and water conservation in new development through the application process. Ongoing.
Jurisdiction Cupertino
Reporting Year 2024 (Jan. 1 - Dec. 31)
D_1_Name D_2_Objective D_3_Time D_4_Statu s
12 3 4
Name of Program Ob jective Timeframe in H.E Status of Pro gram Implementation
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Table D
Program Implementation Status pursuant to GC Section 65583 HE-4.1.1 Enforcement
of Title 24
The City will continue to enforce Title 24 requirements for energy conservation and will evaluate using some of the other suggestions as identified in the Environmental Resources/Sustainability Element.
Ongoing as projects
are proposed.
Implemented through the Municipal Code. The City has
Chapter 16.58, Green Building Standards Code, that
requires certain projects to achieve LEED certification or similar. Staff will continue to enforce Title 24 requirements through the review and approval of development
applications. Ongoing
HE-4.1.2 Sustainable
Practices
The City will continue to implement the Landscape Ordinance for water conservation and the Green Building Ordinance (adopted in 2013) that applies primarily to new residential and nonresidential development, additions, renovations, and tenant improvements of 10 or more units. To further the objectives of the Green Building Ordinance, the City will evaluate the potential to provide incentives, such as waiving or reducing fees, for energy conservation improvements at affordable housing projects (existing or new) with fewer than 10 units to exceed the minimum requirements of the California Green Building Code. The City will also implement the policies in its climate action plan to achieve residential-focused greenhouse gas emission reductions and further these community energy and water conservation goals.
Ongoing as projects
are proposed.
Consider additional
incentives if
neccesary by June
2025.
Implemented through the Municipal Code. Staff will
continue to enforce the Landscape Ordinance and the
Green Building Ordinance requirements through the review and approval of development applications. Ongoing.
HE-4.1.3 Sustainable,
Energy-Efficient
Housing
The City will work with and support housing developers to develop sustainable, energy-efficient housing. Such development should include solar panels, green roofs, energy-efficient lighting, and other features that aim toward carbon-neutral impacts while lowering energy costs.
Ongoing as projects
are proposed.
Staff will continue to review and approve applications for housing development that utilize sustainable, energy
efficient practices. Ongoing.
HE-4.1.4 Water and
Wastewater Priority
Consistent with the provisions of state law, the City will immediately forward its adopted Housing Element to its water and wastewater providers so they can grant priority for service allocations to proposed developments that include units affordable to lower-income households.
Concurent with HE
adoption
Staff forwarded the certified 2023-2031 Housing Element to water and wastewater providers after receiving a letter of substantial compliance from HCD. Complete as of January 2025.
Policy HE-5.1
Support organizations that provide services to lower-income and special needs households in the City, such as persons experiencing homelessness, extremely low-income households, seniors, large households, persons with disabilities, and single-parent households.
Ongoing
Staff will continue to support non-profit organizations which provide services to low-income residents through the CDBG, BMR, and HSG program which releases funds on an annual
basis through a notice of funding availability. Ongoing.
HE-5.1.1 Emergency
Shelters
The City commits to complying with the requirements of state law regarding emergency shelters.
As part of this compliance, the City will:
Continue to facilitate housing opportunities for special-needs persons by allowing emergency shelters as a permitted use, without discretionary review in the R4 zoning district and continuing to permit emergency shelters in the Quasi Public (BQ) zoning district.
Amend the definition of emergency shelters to include other interim interventions, including but not limited to, navigation centers, bridge housing, and respite or recuperative care.
Amend the Zoning Code to allow emergency shelters as a permitted use, without discretionary review, in the new R4 zoning district.
Review and revise managerial standards, consistent with State law.
Adopt zoning code
amendment by June
2024.
Amendments to zoning code were approved through a
public hearing before the City Council. (Resolution 24-039, Ordinance 24-2262, Ordinance 24-2261). Complete as of
July 2024. The City of Cupertino has joined with other West Valley Cities to study opportunities to addressed issues faced by the unhoused, including the development of
temporary and emergency housing facilities, and will sign an MOU for the combined effort in 2025 which will execute a group contract with GoodCity to conduct the study.
HE-5.1.2 Supportive
Services for Lower-
Income Households
and Persons with
Special Needs
The City will continue to use its BMR AHF, CDBG funds, and General Fund Human Service Grants (HSG) funds to provide for a range of supportive services for lower-income households and persons with special needs.
Annual publication
of a Request for
Proposals. Ongoing
as applicants for
funding are
received.
Staff will continue to annual publish a Request for
Proposals for low-income public services and will review applications to ensure that they meet the fund guidelines and further the City's low-income service goals. In 2024, the following organizations received funding:
•CDBG $19,054.05 to Live Oak Adult Day Services, a senior adult day care.
•CDBG $35,974.05 to West Valley Community Services
(WVCS) CARE Program, a community access to resource
and education program.
•HSG $10,000 to Catholic Charities of Santa Clara County, a long-term care ombudsman program.
•HSG $24,678.11 to Maitri, a transitional housing direct client services program.
•HSG $16,287.55 to Senior Adult Legal Assistance, a legal assistance to elders program.
•HSG $74,034.34 to WVCS Haven to Home program, a
supportive services and housing resources program for
the homeless.
Ongoing.
HE-5.1.3 Rotating
Safe Car Park
The City will continue to support the operation of a Rotating Safe Car Park program in collaboration with local nonprofit service providers, such as West Valley Community Services.
Ongoing as projects
are proposed.
Staff will continue to review and approve applications for the Rotating Safe Car Park program for Cupertino host
locations and support the program through financial
contributions whenever possible. In 2024, the City of
Cuperitno provided $25,000 to the Rotating Safe Car Park program which served 27 households. Ongoing.
HE-5.1.4 Low Barrier
Navigation Center
and Supportive
Housing
The City will amend the Zoning Ordinance to allow supportive housing and low-barrier navigation centers for the homeless by right in mixed-use and nonresidential zoning districts where multifamily uses are permitted, per state law.
Amend zoning code
by December 2024.
Amendments to zoning code were approved through a
public hearing before the City Council. (Ordinance 24-2262, Ordinance 24-2261). Complete as of July 2024.
Amendments were reviewed by HCD prior to adoption.
Complete as of July 2024.
The City of Cupertino has joined
with other West Valley Cities to study opportunities to addressed issues faced by the unhoused, including the
development of temporary and emergency housing
facilities, and will sign an MOU for the combined effort in 2025 which will execute a group contract with GoodCity to conduct the study
Jurisdiction Cupertino
Reporting Year 2024 (Jan. 1 - Dec. 31)
D_1_Name D_2_Objective D_3_Time D_4_Statu s
12 3 4
Name of Program Ob jective Timeframe in H.E Status of Pro gram Implementation
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Table D
Program Implementation Status pursuant to GC Section 65583 HE-5.1.5 Residential
Care Facilities
The Zoning Ordinance now allows residential care facilities for six clients or fewer to be treated as a single-family use consistent with state law. The City will amend the Zoning Ordinance to allow larger residential care facilities that operate as a single housekeeping unit in all zones that permit residential uses, with objective standards similar to those applied to other residential uses permitted in that zonin
g district.
Amend zoning code
by December 2024.
Amendments to zoning code were approved through a
public hearing before the City Council. (Ordinance 24-2262, Ordinance 24-2261). Complete as of July 2024.
Amendments were reviewed by HCD prior to adoption.
HE-5.1.6
Manufactured Homes
The City will amend the Zoning Code to permit manufactured homes, as defined in state law, in the same manner and in the same zoning districts as conventional or stick-built structures are permitted.
Amend zoning code
by December 2024.
Amendments to zoning code were approved through a
public hearing before the City Council. (Ordinance 24-2262, Ordinance 24-2261). Complete as of July 2024.
Amendments were reviewed b
y HCD prior to adoption.
Policy HE-6.1
The City will work to eliminate on a citywide basis all unlawful discrimination in housing with respect to age, race, sex, sexual orientation, marital or familial status, ethnic background, medical condition, or other arbitrary factors, so that all persons can obtain decent housing.
Ongoing
The City will continue to combat housing discrimination through the investigation and enforcement of fair housing law and education of landlords through Project Sentinel. Ongoing.
Policy HE-6.2
The City will work to create opportunities for public education around the issue of housing equity and education about the history of racial segregation to build community and raise awareness. This should include more opportunities for community dialogue and shared experiences. Outreach about these programs will be conducted citywide, but extra focus will be given to areas where long-term patterns of income segregation may be more prevalent.
Ongoing
The City will continue to collaborate with nonprofit proviers of fair housing enforcement and low-income housing legal
defense to educate and raise awareness on systemic housing inequalities within the community. Ongoing.
HE-6.2.1 Fair Housing
Services
The City will continue to:
Partner with a local fair housing service provider, such as Project Sentinel, to provide fair housing services, which include outreach, education, counseling, and investigation of fair housing complaints.
Partner with a local fair housing service provider, such as Project Sentinel, to provide direct services for residents, landlords, and other housing professionals. Among other things, this should address issues related to the use of HUD-VASH vouchers, so that veterans may use such vouchers without discrimination.
Partner with a local fair housing service provider, such as Project Sentinel, to assist individuals with housing problems such as discrimination and rental issues including repairs, and provide information and counseling regarding rights and responsibilities under California tenant landlord law. Additionally, provide annual training to landlords on fair housing rights and responsibilities with the intent of reducing, or eliminating, discrimination.
Coordinate with efforts of the Santa Clara County Fair Housing Consortium to affirmatively further fair housing.
Distribute fair housing materials produced by various organizations at public counters and public events.
Annual fair housing
training for
landlords. Outreach
twice in planning
period.
The City of Cupertino will continue to maintain an annual contract with Project Sentinel for the provision of fair housing services, tenant-landlord dispute resolution, and fair housing education through outreach, counselling, and investgations. In 2024, $50,000 was provided to this
program which provided service to 65 households. Two
outreach events related to fair housing will be held during the planning period in coordination with the Santa Clara County Fair Housing Consortium.
HE-6.2.2 Affirmative
Marketing
The City will work with affordable housing developers to ensure that affordable housing is affirmatively marketed to households with disproportionate housing needs, including Hispanic and Black households who work in and live outside of Cupertino (e.g., materials in Spanish and English, distributed through employers).
Ongoing as projects
are proposed.
City housing staff will coordinate with economic
development staff to develop a list of 50 local employers to distribute marketing matierals for affordable housing.
Outreach will be conducted citywide, but extra marketing efforts will be requested of developers working in or
around areas with historically higher areas of potential income segregation.
HE-6.2.3 Housing
Mobility
Work with a local fair housing service provider, such as Project Sentinel, to contact rental property owners and managers of multifamily apartment complexes to provide fair housing information and assistance. This outreach will include promoting the Housing Choice Voucher (Section 8) program to landlords that have not previously participated in the program and will target use of multi-lingual materials. Target additional outreach to higher-income neighborhoods.
Outreach twice in
planning period.
The City of Cupertino will continue to maintain an annual contract with Project Sentinel for the provision of fair housing services, tenant-landlord dispute resolution, and fair housing education through outreach, counselling, and investgations. Two outreach events related to fair housing will be held during the planning period in coordination with the Santa Clara County Fair Housing Consortium.
HE-6.2.4 Housing
Project Coordinator
To support the implementation of the multiple new and expanded housing programs and policies identified in the Housing Element, assign a member of City staff as the housing project coordinator. This position would assist with developing outreach programs, writing and pursing grant applications, ongoing monitoring of affordable housing production, preservation and rehabilitation, coordination between affordable housing developers, the City, and partner agencies and tracking progress on the many initiatives identified in this Housing Element.
Complete by 2025
The City hired a Senior Housing Coordinator, a dedicated staff member to enact policies of the Housing Element.
Complete as of June 2024.
Policy HE-7.1
The Cupertino community places a high value on the excellent quality of education provided by the three public school districts that serve residents. To ensure the long-term sustainability of the schools, teachers, and faculty, in tandem with the preservation and development of vibrant residential areas, the City will continue to coordinate with the Cupertino Union School District (CUSD), Fremont Union High School District (FUHSD), and Santa Clara Unified School District (SCUSD) Ongoing
Staff will continue to coordinate with local school districts by forwarding development projects for comment and review.
Ongoing.
Policy HE-7.2
Coordinate efforts with regional organizations, including Association of Bay Area Governments (ABAG) and the Bay Area Air Quality Management District (BAAQMD), as well as neighboring jurisdictions, to address housing and related quality of life issues (such as air quality and transportation).
Ongoing
Staff will continue to coordinate with regional organizations such as Association of Bay Area Governments, the
Metropolitan Transportation Commission, Regional
CDBG/Housing Coordinators Group, and the Santa Clara
County Planning Collaborative, to address housing and related quality of life issues. Ongoing.
Policy HE-7.3 Promote public-private partnerships to address housing needs in the community, especialy housing for the workforce. Ongoing
Staff will continue to promote public-private partnerships to address workforce housing needs by engaging local employers and
private organizations. Ongoing.
Jurisdiction Cupertino
Reporting Year 2024 (Jan. 1 - Dec. 31)
D_1_Name D_2_Objective D_3_Time D_4_Statu s
12 3 4
Name of Program Ob jective Timeframe in H.E Status of Pro gram Implementation
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Housing Programs Progress Report
Table D
Program Implementation Status pursuant to GC Section 65583 HE-7.3.1 Coordinate
with Outside
Agencies and
Organizations
The City recognizes the importance of partnering with outside agencies and organizations in addressing local and regional housing issues. These may include, but are not limited to, the following:
School districts
De Anza College
Housing providers
Neighboring jurisdictions
Association of Bay Area Governments (ABAG)
Air Quality Management District
Housing Trust Silicon Valley
Santa Clara County Fair Housing Consortium
Santa Clara County HOME Consortium
Santa Clara County Continuum of Care (COC)
Housing Authority of Santa Clara County (HASCC)
Valley Transportation Authority (VTA)
Specifically, the City will meet with these agencies/organizations periodically to discuss the chan
ging needs, development trends, alternative approaches, and partnering opportunities.
Ongoing as
neccesary
Staff will continue to meet with local and regional agencies as neccesary throughout the planning period to ensure
consistency, integration, and best praticies are employed in city actions in relation to larger scale efforts. The City continues to regularly meet with and collaborate with other regional and local jurisdictions through the following
groups: the Association of Bay Area Governments, the
Santa Clara County Planning Collaborative, the Santa Clara County HOME Consortium, the Santa Clara County PLHA
Consortium, the Regional CDBG/Housing Coordinators
Group, the West Valley Housing/Unhoused Collaboration,
and the Inter-City Unhoused Response Collaborative.
Ongoing.
HE-7.3.2 Coordination
with Local School
Districts
To ensure the long-term sustainability of public schools, teachers, and faculty, in tandem with the preservation and development of vibrant residential areas, the City will coordinate biennially with the local school districts and colleges to identify housing needs and concerns. The City will discuss potential partnerships for affordable housing developments for school district employees and college students, including on school district properties, on a biannual basis. Depending on the outcome of these discussions with school districts and college leadership, the City will notify districts and partner developers about relevant funding opportunities as they become available, coordinate technical assistance on grant applications and offer other incentives.
Outreach biennially
Staff will conduct biennial outreach to local school districts to solicite feedback on the emerging needs of teacher and student housing and to identify new opportunities as they become available.
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Period 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
34 APN Street Address Project Name+ Local Jurisdiction
Tracking ID+
Very Low
Income
Low
Income
Moderate
Income
Above Moderate
Income
Description of Commercial
Development Bonus
Commercial Development Bonus
Date Approved
Summary Row: Start Data Entry Below
Units Constructed as Part of Agreement
Commercial Development Bonus Approved pursuant to GC Section 65915.7 Table E
Note: "+" indicates an optional field
Project Identifier
1 2
Cells in grey contain auto-calculation
formulas
(CCR Title 25 §6202)
Annual Progress Report January 2020
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT Note: "+" indicates an optional field Reporting Period 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
The description should adequately document how
each unit complies with subsection (c) of Government
Code Section 65583.1+.
For detailed reporting requirements, see the chcklist
here:
Extremely Low-
Income
+ Very Low-Income+ Low-Income+ TOTAL UNITS+
Extremely Low-
Income+
Very Low-
Income+ Low-Income+ TOTAL UNITS+
https://www.hcd.ca.gov/community‐
development/docs/adequate‐sites‐checklist.pdf
Rehabilitation Activity
Preservation of Units At-Risk
Acquisition of Units
Mobilehome Park Preservation
Total Units by Income
Table F
Please note this table is optional: The jurisdiction can use this table to report units that have been substantially rehab ilitated, converted from non-affordable to affordable by acquisi tion, and preserved, including mobil ehome park preservation, consistent with the standards set forth in Government Code section 65583.1, subdivision (c). Please note, motel, hotel, hostel rooms or ot her structures that are converted from non-residential to residential units pursuant to Government Code section 65583.1(c)(1)(D) are considered net-new hous ing units and must be reported in Table A2 and not reported in Table F.
Activity Type
Units that Do Not Count Towards RHNA+
Listed for Informational Purposes Only
Units that Count Towards RHNA +
Note - Because the statutory requirements severely limit what can be counted, please contact HCD at [email protected] and we will unlock the form which enable you to populate these fields.
Units Rehabilitated, Preserved and Acquired for Alternative Adequate Sites pursuant to Government Code section 65583.1(c) Annual Progress Report January 2020
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Note: "+" indicates
an optional field
Reporting Period 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Cells in grey contain auto-calculation formulas Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Notes
23 6
Prior APN+ Current APN Street Address Project Name+
Local
Jurisdiction
Tracking ID
Unit Category
(2 to 4,5+)
Tenure
R=Renter
Very Low-
Income Deed
Restricted
Very Low-
Income Non
Deed
Restricted
Low- Income Deed
Restricted
Low- Income
Non Deed
Restricted
Moderate- Income
Deed Restricted
Moderate-
Income Non
Deed Restricted
Above
Moderate-
Income
Total Moderate Income Units
Converted from Above
Moderate
Date Converted Notes
Summary Row: Start Data Entry Below 0 0 00 00 0 0
Table F2
Above Moderate Income Units Converted to Moderate Income Pursuant to Government Code section 65400.2 For up to 25 percent of a jurisdiction’s moderate-income regional housing need allocation, the planning agency may include the number of units in an existing multifamily building that were converted to deed-restricted rental housing for moderate-income households by the imposition of affordability covenants and restrictions for the unit. Before adding information to this table, please ensure housing developments meet the requirements described in Government Code 65400.2(b). 5 Project Identifier Unit Types
1 4
Affordability by Household Incomes After Conversion Units credited toward Moderate Income RHNA
Jurisdiction Cupertino
Reporting Period 2024 (Jan. 1 - Dec. 31)
Planning Period 6th Cycle 01/31/2023 - 01/31/2031 ANNUAL ELEMENT PROGRESS REPORT Housing Element Implementation
23 4
APN Street Address Project Name+ Local Jurisdiction
Tracking ID+
Realistic Capacity
Identified in the
Housing Element
Entity to whom the site
transferred Intended Use for Site
1 Summary Row: Start Data Entry Below
Note: "+" indicates an optional field
Cells in grey contain auto-calculation
formulas
Table G
Locally Owned Lands Included in the Housing Element Sites Inventory that have been sold, leased, or otherwise disposed of Project Identifier
NOTE: This table must only be filled out if the housing element sites inventory contains a site which is or was owned by the reporting jurisdiction, and has been sold, leased, or otherwise disposed of during the reporting year.
Jurisdiction Cupertino Note: "+" indicates an optional field Reporting Period 2024
(Jan. 1 - Dec.
31)
Cells in grey contain auto-calculation
formulas
Designation Size Notes
12 3 4 5 6 7
APN Street Address/Intersection Existing Use Number of
Units
Surplus
Designation
Parcel Size (in
acres) Notes
357-11-030 10301 Byrne Avenue Residential 1 Surplus Land 0.3 Property surplused 7/7/2023.
NOTE: This table must contain an invenory of ALL
surplus/excess lands the reporting jurisdiction owns
Summary Row: Start Data Entry Below
Parcel Identifier
ANNUAL ELEMENT PROGRESS REPORT
Housing Element Implementation
Table H
Locally Owned Surplus Sites
For Santa Clara County jurisdictions, please format the APN's as follows:999-99-999 Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Period 2024 (Jan. 1 - Dec. 31) Housing Element Implementation Planning Period 6th Cycle 01/31/2023 - 01/31/2031
Project Type Date
Units (Beds/Student
Capacity) Granted
Density Bonus
Notes
23 5 6
APN Street Address Project Name+ Local Jurisdiction
Tracking ID+
Unit Category
(SH - Student Housing) Date Very Low- Income
Deed Restricted
Very Low- Income
Non Deed
Restricted
Low- Income Deed
Restricted
Low- Income Non
Deed Restricted
Moderate- Income
Deed Restricted
Moderate- Income
Non Deed
Restricted
Above
Moderate-
Income
Total Additional Beds
Created Due to Density
Bonus
Notes
Summary Row: Start Data Entry Below
Note: "+" indicates an optional field
Cells in grey contain auto-calculation formulas
Table J
Student housing development for lower income students for which was granted a density bonus pursuant to subparagraph (F) of paragraph (1) of subdivision (b) of Section 65915 Project Identifier Units (Beds/Student Capacity) Approved 1 4
NOTE: STUDENT HOUSING WITH DENSITY BONUS ONLY. This
table only needs to be completed if there were student housing projects WITH a density bonus approved pursuant to
Government Code65915(b)(1)(F)
Annual Progress Report January 2020
Jurisdiction Cupertino ANNUAL ELEMENT PROGRESS REPORT
Reporting Period 2024 (Jan. 1 - Dec. 31)
Planning Period 6th Cycle 01/31/2023 - 01/31/2031
YesDoes the Jurisdiction have a local tenant preference policy? If the jurisdiction has a local tenant preference policy, provide a link to the jurisdiction's webpage containing authorizing local ordinance and supporting materials.
Notes
Table K
Tenent Preference Policy
Local governments are required to inform HCD about any local tenant preference ordinance the local government maintains when the jurisdiction submits their annual progress report on housing approvals and production, per Government Code 7061 (SB 649, 2022, Cortese). Effective January 1, 2023, local governments adopting a tenant preference are required to create a webpage on their internet website containing authorizing local ordinance and supporting materials, no more than 90 days after the ordinance becomes operational.
https://www.cupertino.gov/files/assets/city/v/1/residents/documents/cc‐reso‐no‐18024‐adopting.pdf