Tuesday, March 18, 2025
5:3
0 PM
CITY OF CUPERTINO
Televised Special Meeting (5:30) and Regular Meeting (6:45) 10350 Torre Avenue, Council Chamber and via Teleconference City
Council
LIANG CHAO, MAYOR
KITTY MOORE, VICE MAYOR
J.R. FRUEN, COUNCILMEMBER
SHEILA MOHAN, COUNCILMEMBER
R "RAY" WANG, COUNCILMEMBER
IN PERSON AND TELECONFERENCE MEETING
For more information:
(408) 777-3200 | www.cupertino.gov
AGENDA
1 CC 03-18-2025
1 of 541
City Council A genda March 18, 2025
IN-PERSON AND TELECONFERENCE / PUBLIC PARTICIPATION INFORMATION Me
mbers of the public wishing to observe the meeting may do so in one of the following ways:
1) Attend in person at Cupertino Community Hall, 10350 Torre Avenue. 2) Tune to Comcast Channel 26 and AT&T U-Verse Channel 99 on your TV. 3) The meeting will also be streamed live on and online at www.Cupertino.org/youtube and www.Cupertino.org/webcast
Members of the public wishing to comment on an item on the agenda may do so in the following ways:
1) Appear in person at Cupertino Community Hall
2) E-mail comments by 4:00 p.m. on Tuesday, March 18 to the Council at [email protected]. These e-mail comments will also be forwarded to Councilmembers by the City Clerk’s office before the meeting and posted to the City’s website after the meeting. Members of the public that wish to share a document must email [email protected] prior to the meeting.
Emailed comments received following the agenda publication, prior to or during the meeting, will be posted to the City’s website. Comments on non-agenda items will be included upon the sender's request.
Members of the public may provide oral public comments during the Meeting as follows:
Oral public comments will be accepted during the meeting. Comments may be made during “oral communications” for matters not on the agenda, and during the public comment period for each agenda item.
Oral public comments may be made during the public comment period for each agenda item.
Members of the audience who address the City Council must come to the lectern/microphone, and are requested to complete a Speaker Card and identify themselves.
Completion of Speaker Cards and identifying yourself is voluntary and not required to attend the meeting or provide comments.
3) Teleconferencing Instructions
2 CC 03-18-2025
2 of 541
City Council A genda March 18, 2025
To address the City Council, click on the link below to register in advance and access the m
eeting:
Online
Register in advance for this webinar:
https://cityofcupertino.zoom.us/webinar/register/WN_pbNF7si8QkOfRHmOK8XwVg Phone
Dial: 669-900-6833 and enter Webinar ID: 925 8892 1989 (Type *9 to raise hand to speak, *6 to unmute yourself). Unregistered participants will be called on by the last four digits of their phone number.
Join from an H.323/SIP room system:
H.323:
144.195.19.161 (US West)
206.247.11.121 (US East)
Meeting ID: 925 8892 1989
SIP: [email protected]
After registering, you will receive a confirmation email containing information about joining the webinar.
Please read the following instructions carefully:
1. You can directly download the teleconference software or connect to the meeting in your internet browser. If you are using your browser, make sure you are using a current and up-to-date browser: Chrome 30+, Firefox 27+, Microsoft Edge 12+, Safari 7+. Certain functionality may be disabled in older browsers, including Internet Explorer.
2. You will be asked to enter an email address and a name, followed by an email with instructions on how to connect to the meeting. Your email address will not be disclosed to the public. If you wish to make an oral public comment but do not wish to provide your name, you may enter “Cupertino Resident” or similar designation.
3. When the Mayor calls for the item on which you wish to speak, click on “raise hand,” or, if you are calling in, press *9. Speakers will be notified shortly before they are called to speak.
4. When called, please limit your remarks to the time allotted and the specific agenda topic.
5. Members of the public that wish to share a document must email [email protected]
3 CC 03-18-2025
3 of 541
City Council A genda March 18, 2025
prior to the meeting. These documents will be posted to the City’s website after the meeting.
NOTICE AND CALL FOR A SPECIAL MEETING OF THE CUPERTINO CITY COUNCIL N
OTICE IS HEREBY GIVEN that a special meeting of the Cupertino City Council is hereby called for Tuesday, March 18, 2025, commencing at 5:30 p.m. in Community Hall Council Chamber, 10350 Torre Avenue, Cupertino, California 95014 and via teleconference. Said special meeting shall be for the purpose of conducting business on the subject matters listed below under the heading, “Special Meeting."
SPECIAL MEETING
ROLL CALL - 5:30 PM
AC
TION CALENDAR
1. Subject: Introduce Municipal Code amendments to the Cupertino Municipal Code, Title 2 to add Chapter 2.96 and codify the Economic Development Committee Recommended Action: 1. C onduct the first reading of Ordinance No. 25-2269 “An Ordinance of the City Council of the City of Cupertino Amending City Code Title 2 Chapter 2.96: Economic Development Committee”
2. Find that the proposed actions are exempt for CEQA
Staff Report
A – Draft Ordinance Adding Chapter 2.96 Economic Development Committee_redline B – Draft Ordinance Adding Chapter 2.96 Economic Development Committee_clean C - Informational Memo - April 25, 2024 - Economic Development Update
STUDY SESSION
2. Subject: Study Session to consider reestablishing the City’s Legislative Review Committee.
Recommended Action: Provide staff direction on reestablishing the Legislative Review Committee and direct the City Attorney to consider the impact of Municipal Code Section 2.17.031 on any reestablished Legislative Review Committee.
Staff Report
ADJOURNMENT
R
EGULAR MEETING
CALL TO ORDER - 6:45 PM
P
LEDGE OF ALLEGIANCE
4 CC 03-18-2025
4 of 541
City Council A genda March 18, 2025
ROLL CALL
CLOSED SESSION REPORT
CEREMONIAL ITEMS
1. Subject: Receipt of annual report of activities from West Valley Community Services (WVCS) and recognition for 51 years of dedicated community service Recommended Action: Receive annual report of activities from WVCS and present proclamation recognizing 51 years of dedicated community service A - Proclamation
POSTPONEMENTS AND ORDERS OF THE DAY
O
RAL COMMUNICATIONS
This portion of the meeting is reserved for persons wishing to address the Council on any matter within t
he jurisdiction of the Council and not on the agenda for discussion. The total time for Oral Communications will ordinarily be limited to one hour. Individual speakers are limited to three (3) minutes. As necessary, the Chair may further limit the time allowed to individual speakers, or reschedule remaining comments to the end of the meeting on a first come first heard basis, with priority given to students. In most cases, State law will prohibit the Council from discussing or making any decisions with respect to a matter not listed on the agenda. A councilmember may, however, briefly respond to statements made or questions posed by speakers. A councilmember may also ask a question for clarification, provide a reference for factual information, request staff to report back concerning a matter, or request that an item be added to a future City Council agenda in response to public comment.
CONSENT CALENDAR (Items 2-7)
Items appearing on the Consent Calendar are considered routine City business and may be approved by o
ne motion. Typical items may include meeting minutes, awards of contracts, the ratification of accounts payable, and second readings of ordinances. Any member of the Council may request to have an item removed from the Consent Calendar based on the rules set forth in the City Council Procedures Manual. Members of the public may provide input on one or more consent calendar items when the Mayor asks for public comments on the Consent Calendar.
2. S ubject: Approval of March 3, 2025 City Council minutes and Workshop Summary Recommended Action: Approve the March 3, 2025 City Council minutes and Workshop Summary
A - Draft Minutes and Workshop Summary
3. S ubject: Approval of March 4, 2025 City Council minutes Recommended Action: App rove the March 4, 2025 City Council minutes A - Draft Minutes
5 CC 03-18-2025
5 of 541
City Council A genda March 18, 2025
4. Subject: Ratifying Accounts Payable for the periods ending February 14, 2025 and February 28, 2025
Recommended Action: A. A dopt Resolution No. 25-019 ratifying Accounts Payable for the Period ending February 14, 2025; and
B. Adopt Resolution No. 25-020 ratifying Accounts Payable for the Period ending February 28, 2025
Staff Report
A – Draft Resolution 2.14.25
B – AP Payment Register for the Period Ending 2.14.25
C – Draft Resolution 2.28.25
D – AP Payment Register for the Period Ending 2.28.25
5. Subject: Construction contract for the 2025 Slurry Seal/Fog Seal Project to Doolittle Construction, LLC. in the amount of $859,000.
Recommended Action: 1. Award a construction contract for the 2025 Slurry Seal/Fog Seal Project number 2025-102 in the amount of $859,000 to Doolittle Construction, LLC.
2. Reject the non-responsive bid of the lowest bidder.
3. Authorize the City Manager to execute the construction contract with Doolittle Construction, LLC. when all conditions have been met.
4. Authorize the Director of Public Works to execute any necessary construction change orders up to a construction contingency amount of $85,900 (10%) for a total contract amount not to exceed $944,900.
Staff Report
A - Draft Contract
B - Location List
C - Location Map
D - Contract Documents - Project Manual
6. S ubject: Receive 2024 General Plan and Housing Annual Progress Report (APR) Recommended Action: R eceive the General Plan and Housing APRs Staff Report
A - 2024 General Plan Annual Progress Report
B - 2024 Housing Annual Progress Report
7. Subject: Reaffirm amendments to the Cupertino City Council Procedures Manual (Continued from March 4, 2025 City Council Meeting)
Recommended Action: Adopt Resolution No. 25-021 reaffirming amendments to the Cupertino City Council Procedures Manual
Staff Report
A - Proposed Resolution No. 25-021
B - Redline of Cupertino City Council Procedures Manual implementing changes previously adopted
6 CC 03-18-2025
6 of 541
City Council A genda March 18, 2025
PUBLIC HEARINGS - None
Effective January 1, 2023, Government Code Section 65103.5 (SB 1214) limits the distribution of copyrighted material associated with the review of development projects. Members of the public wishing to view plans that cannot otherwise be distributed under SB 1214 may make an appointment with the Planning Division to view them at City Hall by sending an email to [email protected]. Plans will also be made available digitally during the hearing to consider the proposal.
ACTION CALENDAR
8. Subject: Receive Citywide Policy Inventory; Authorize Gap Analysis Final Report and Review the City Council Policy Inventory
Recommended Action: 1. R eceive the Citywide Policy Inventory and Gap Analysis Report
2. Review the City Council Policy Inventory and authorize Moss Adams LLP (“Moss Adams”) to include gap analysis as part of the FY 2025-26 Internal Audit Work Plan Staff Report
A – Revised Citywide Administrative Policy Inventory and Gap Analysis Final Report B - City Council Policy Inventory
9. Subject: Receive City Council Subcommittee report on July 4th fireworks and provide Council direction for next steps
Recommended Action: Receive the City Council Subcommittee report on July 4th fireworks and provide Council direction for next steps
10. Subject: Confirm recommended language for two new City Council Strategic Goals; Finalize Fiscal Years 2025-2027 City Work Program
Recommended Action: 1. C onfirm the recommended language for the two new City Council Strategic Goals; Environmental Sustainability and Fiscal Strategy
2. Finalize the Fiscal Years 2025-2027 City Work Program Staff Report
A - Workshop Summary
B - Council Selected Projects from March 3 Workshop
C - Not Selected Items
D - Staff Proposed Descriptions for Seven CWP Items
E - Current CWP Updates for Year 2 Projects from Fiscal Years 2023-2025 F - Proposed List for FY 2025-2027 CWP
ITEMS REMOVED FROM THE CONSENT CALENDAR
C
ITY MANAGER REPORT
ORAL COMMUNICATIONS - CONTINUED
COUNCILMEMBER REPORTS
7 CC 03-18-2025
7 of 541
City Council A genda March 18, 2025
11. Subject: Councilmember Reports
A - Councilmember Report, Chao
B - Councilmember Report, Fruen
C - Councilmember Report, Mohan
D - Councilmember Report, Moore
FUTURE AGENDA ITEMS
A
DJOURNMENT
Lobbyist Registration and Reporting Requirements: Individuals who influence or attempt to influence l
egislative or administrative action may be required by the City of Cupertino’s lobbying ordinance (Cupertino Municipal Code Chapter 2.100) to register and report lobbying activity. Persons whose communications regarding any legislative or administrative are solely limited to appearing at or submitting testimony for any public meeting held by the City are not required to register as lobbyists.
For more information about the lobbying ordinance, please contact the City Clerk’s Office at 10300 Torre Avenue, Cupertino, CA 95014; telephone (408) 777-3223; email [email protected]; and website: www.cupertino.org/lobbyist.
The City of Cupertino has adopted the provisions of Code of Civil Procedure §1094.6; litigation challenging a final decision of the City Council must be brought within 90 days after a decision is announced unless a shorter time is required by State or Federal law.
Prior to seeking judicial review of any adjudicatory (quasi-judicial) decision, interested persons must file a petition for reconsideration within ten calendar days of the date the City Clerk mails notice of the City’s decision. Reconsideration petitions must comply with the requirements of Cupertino Municipal Code §2.08.096. Contact the City Clerk’s office for more information or go to http://www.cupertino.org/cityclerk for a reconsideration petition form.
In compliance with the Americans with Disabilities Act (ADA), anyone who is planning to attend this meeting who is visually or hearing impaired or has any disability that needs special assistance should call the City Clerk's Office at 408-777-3223, at least 48 hours in advance of the meeting to arrange for assistance. In addition, upon request in advance by a person with a disability, meeting agendas and writings distributed for the meeting that are public records will be made available in the appropriate alternative format.
Any writings or documents provided to a majority of the Cupertino City Council after publication of the packet will be made available for public inspection in the City Clerk’s Office located at City Hall, 10300 Torre Avenue, Cupertino, California 95014, during normal business hours; and in Council packet archives linked from the agenda/minutes page on the City web site.
IMPORTANT NOTICE: Please be advised that pursuant to Cupertino Municipal Code section
8 CC 03-18-2025
8 of 541
City Council A genda March 18, 2025
2.08.100 w ritten communications sent to the City Council, Commissioners or staff concerning a matter on the agenda are included as supplemental material to the agendized item. These written communications are accessible to the public through the City website and kept in packet archives. Do not include any personal or private information in written communications to the City that you do not wish to make public, as written communications are considered public records and will be made publicly available on the City website.
9 CC 03-18-2025
9 of 541
CITY OF CUPERTINO
Agenda Item
25-13741 Agenda Date: 3/18/2025
Agenda #: 1.
Subject: Introduce Municipal Code amendments to the Cupertino Municipal Code, Title 2 to add Chapter 2.96 and codify the Economic Development Committee
1. Conduct the first reading of Ordinance No. 25-2269 “An Ordinance of the City Council of the City of Cupertino Amending City Code Title 2 Chapter 2.96: Economic Development Committee”
2. Find that the proposed actions are exempt for CEQA
CITY OF CUPERTINO Printed on 3/13/2025Page 1 of 1
powered by Legistar™
10 CC 03-18-2025
10 of 541
01276.0001/1059297.4
CITY COUNCIL STAFF REPORT
Meeting: March 18, 2025
Subject
Introduce Municipal Code amendments to the Cupertino Municipal Code, Title 2 to add Chapter 2.96 and codify the Economic Development Committee.
Recommended Action
1. Conduct the first reading of Ordinance No. 25-___ “An Ordinance of the City Council of the City of Cupertino Amending City Code Title 2 Chapter
2.96: Economic Development Committee.”
2. Find that the proposed actions are exempt for CEQA.
Background
Historically, a working group that functioned like the Economic Development Committee (EDC) met informally since the ‘90’s to brainstorm items of importance pertinent to local businesses and to provide feedback to staff on business-related City initiatives or projects. The EDC was made up of four City staff members, two City Council members, one Planning Commissioner, and four representatives from the business community, including the Cupertino Chamber of Commerce.
As part of the FY 2021-2022 City Work Program discussion, the City Council requested that the EDC be codified in the Municipal Code by ordinance.
Thereafter the City Council unanimously adopted Ordinance 22-2240 on July 19, 2022, which formally codified the EDC, after a first reading on July 7, 2022. In 2023, the City Council voted to repeal Ordinance 22-2240, disbanding the EDC via Ordinance 23-2247 on March 7, 2023, after a first reading on February 21, 2023.
Reasons for Recommendation and Available Options
11 CC 03-18-2025
11 of 541
01276.0001/1059297.4
Following the EDC disbandment and as committed to the City Council, staff have been actively meeting with local business owners, commercial real estate professionals, and other economic development stakeholders as part of its ongoing efforts to promote citywide economic development. As part of these ongoing efforts, staff coordinated a small focus group discussion with local businesses in December 2023, gathering feedback that informed and contributed to the Applied Development Economics Market Study. This effort has also been documented in an informational memo on April 25, 2024 - Economic Development Update.
On December 17, 2024, the City Council added an agenda item to reestablish the EDC via ordinance substantially mirroring the earlier ordinance, Ordinance 22- 2240, which according the associated staff report, had been “drafted based on input from the then-sitting Council and staff research on economic development committees in other local cities.”
The proposed ordinance states that business sector Committee Members must work for an organization located within the City or be residents of the City, or both. In the past, some Council Members expressed the opinion that all Committee Members should have close connections to the City. The Council may wish to discuss whether business sector Committee Members should also be required to be residents of the City.
Economic Development Committee
The Economic Development Committee shall serve in an advisory capacity to the City Council and provide expertise and guidance on policy related to economic development. The Committee shall also actively promote Cupertino as a location of choice for current and prospective businesses.
Powers and Functions
To fulfill their mission, the Committee may involve itself in the following activities:
1. Make recommendations to City Council on a broad range of strategic matters broadly applicable to the City’s economic development goals;
2. Serve as an ambassador to shed a positive light on the City by sharing economic development resources and information to prospective businesses and stakeholders, thus positioning the City as a location of choice; and
3. Encourage public/private partnerships to further the City’s economic 12 CC 03-18-2025
12 of 541
01276.0001/1059297.4
development goals by identifying potential resources.
Membership
As proposed, the membership of this new Committee would consist of nine members, including elected officials, industry sector representatives, and key partners:
1. City Councilmember
2. City Councilmember
3. Technology Sector Business Representative
4. Retail/Small Business Representative
5. Hospitality/Tourism Sector Representative
6.Education Sector Representative
7.Commercial Real Estate Representative
8.Sustainability Commissioner
9.Technology, Information, and Communications Commissioner
Term
Committee members would serve at the pleasure of the City Council for an initial term of four years, with a possibility to serve for an additional four years.
Committee members would not serve for more than two consecutive terms.
Sustainability Impact
No sustainability impact.
Fiscal Impact
Based on primary estimate, approximately 160 hours of staff time is required annually to support the Commission. Specifically, there will be staff support from the City Manager’s office, Economic Development division, City Clerk’s office, and Innovation and Technology to support four quarter meetings a year.
These hours encompass administrative and liaison duties, such as attending meetings, writing minutes, coordination amongst commissioners, preparing agendas and staff reports. Additionally, they account for the time required to develop agenda items, including presentations, speakers, and other related materials. In addition to up 20- 30 hours from the Clerk’s Office to conduct commissioner interviews and onboarding new EDC members. _____________________________________
Prepared by: F loy Andrews, City Attorney
Daniel Degu, Economic Development Manager
13 CC 03-18-2025
13 of 541
01276.0001/1059297.4
Reviewed by: T ina Kapoor, Deputy City Manager
Approved for Submission by: Pamela Wu, City Manager
Attachments:
A – Draft Ordinance Adding Chapter 2.96 Economic Development Committee_redline
B - Draft Ordinance Adding Chapter 2.96 Economic Development Committee_clean
C – Informational Memo – April 25, 2024 - Economic Development Update
14 CC 03-18-2025
14 of 541
01276.0001/1059288.2
ORDINANCE NO. 25‐____
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AMENDING CITY CODE TITLE 2
CHAPTER 2.96: ECONOMIC DEVELOPMENT COMMITTEE
The City Council of the City of Cupertino finds that:
1. The purpose of this Ordinance is to reestablish the Economic Development Committee (EDC).
2. An early formation of the EDC met informally for well over two decades to discuss items of importance pertinent to local businesses and to provide feedback to staff on business‐rel ated City initiatives or projects. In 2022, the of EDC was formally codified in the Municipal Code through Ordinance 22‐2240, by unanimous vote of the City Council. That ordinance was later repealed on March 7, 2023, by Ordinance 23‐2247. The City Council has requested that th e EDC be recodified in the Municipal Code through the adoption of a new ordinance.
NOW, THEREFORE, THE CITY COUNCIL OF THE OF CITY OF CUPERTINO DOES ORDAIN AS FOLLOWS:
SECTION 1: Adoption.
The Cupertino Municipal Code is hereby amended to add Chapter 2.96 as set forth in Attachment A.
SECTION 2: Severability and Continuity.
The City Council declares that each section, sub‐section, paragraph, sub‐paragraph, sentence, clause and phrase of this ordinance is severable and independent of every other section, sub‐section, paragraph, sub‐paragraph, sentence, clause and phrase of this ordinance. If any section, sub‐section, paragraph, sub‐paragraph, sentence, clause or phrase of th is ordinance is held invalid, or its application to any person or circumstance, be determined by a court of competent jurisdiction to be unlawful, unenforceable or otherwise void, the City Council declares that it would have adopted the remaining provisions of this ordinance irrespective of such portion, and further declares its express intent that the remaining portio
ns of this ordinance should remain in effect after the invalid portion has been eliminated.
15 CC 03-18-2025
15 of 541
Ordinance No. ___________________
01276.0001/1059288.2
SECTION 3: California Environmental Quality Act.
This Ordinance is not a project under the requirements of the California Environmental Quality Act, together with related State CEQA Guidelines (collectively, “CEQA”) because it has no potential for resulting in physical change in the environment. In the event that this Ordinance is found to be a project under CEQA, it is subj ect to the CEQA exemption contained in CEQA Guidelines section 15061(b)(3) because it can be seen with certainty to have no possibility that the action approved may have a significant effect on the environment. CEQA applies only to actions which have the potential for causing a significant effect on the environment. Where it can be se en with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. In this circumstance, the amendments to the Municipal Code would have no or only a de minimis effect on the environment. The foregoing determination is made by the City Council in its independent judgment.
SECTION 4: Effective Date.
This Ordinance shall take effect thirty days after adoption as provided by Government Code Section 36937.
SECTION 5: Publication.
The City Clerk shall give notice of adoption of this Ordinance as required by law.
Pursuant to Government Code Section 36933, a summary of this Ordinance may be prepared by the City Clerk and published in lieu of publication of the entire text. The City Clerk shall post in the office of the City Clerk a certified copy of the full text of the Ordinance listing the names of the City Council members voting for and against th e
ordinance.
INTRODUCED at a regular meeting of the Cupertino City Council on March 18, 2025, and ENACTED at a regular meeting of the Cupertino City Council on ___________, by the follo
wing vote:
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
16 CC 03-18-2025
16 of 541
Ordinance No. ___________________
01276.0001/1059288.2
SIGNED:
_______________________________
Liang Chao, Mayor
City of Cupertino
_______________________________
Date
ATTEST:
_______________________________
Kirsten Squarcia, City Clerk
_______________________________
Date
APPROVED AS TO FORM:
_______________________________
Floy E. Andrews, City Attorney
_______________________________
Date
17 CC 03-18-2025
17 of 541
01276.0001/1059288.2 Attachment A – Page 1
ATTACHMENT A ‐ Chapter 2.96: Economic Development Committee The sections of the Cupertino Municipal Code set forth below are amended or adopted as follows:
2.96.010 Established–Composition.
A. The Economic Development Committee of the City of Cupertino is re‐established.
The Economic Development Committee (hereinafter referred to in this Chapter as “Committee”) shall consist of nine (9) members as follows:
1. City Councilmember
2. City Councilmember
3. Technology Sector Business Representative
4. Retail/Small Business Representative
5. Hospitality/Tourism Sector Representative
6. Education Sector Representative
7. Commercial Real Estate Representative
8. Sustainability Commissioner
9. Technolog
y, Information, and Communications Commissioner
B. The Committee shall be comprised of: (1) two Councilmembers; (2) one representative from each of the following industry sectors – Technology, Retail, Hospitality, Education, and Commercial Real Estate; and (3) one member who is currently serving on the Sustainability Commission; and (4) one member who is currently serving on the Technolog
y, Information, and Communications
Commissions. At least two industryIndustry sector representative Committee Members shallrepresentatives must work for an organization located within the City or be Cupertino residents of the City, or both.
C. None of the industry sector representative Committee Members shall be officials or employees of the City. No member of the Committee shall cohabit with, as defined by law, nor be related by blood or marriage, to any other member of the Committee, to the City Manager, or to any staff person(s) who may be assigned to assist this Committee
.
18 CC 03-18-2025
18 of 541
01276.0001/1059288.2 Attachment A – Page 2
D. Members of the Committee shall be appointed by the City Council.
2.96.020 Terms of Office.
A. Committee Members serve at the pleasure of the City Council. The term of office for Committee Members shall be staggered with the initial appointment of five members to two‐year terms and four membe rs to four‐year terms. Following the initial appointment, all members shall be appointed to four‐year terms. If a Committee Member is replaced or removed by Council, resigns, or is no longer eligible to serve on the Committee, Council shall appoint a replacement to serve the remaining period of the Committee Member’s term. All terms shall end on January 30 of the year the term is due to expire. No Committee Member shall serve more than two consecutive terms, except tha
t a Committee Member may serve
more than two consecutive terms if he or she has been appointed to th e Committee to fill an unexpired term of less than two years.
B. The appointment, reappointment, and rules governing industry sector representative Committee Members are governed by the Resolution of the Cupertino City Council which governs advisory bodies.
C. The City Council may in its discretion adopt different policies, procedures, and terms of service for the appointment of City Councilmembers and Commissio ners
to serve on the Committee.
2.96.030 Members–Vacancy or Removal.
Any Committee Member may be removed by a majority vote of the City Council. If a vacancy occurs, other than by expiration of a term, it shall be filled by the City Council’s appointme
nt for the unexpired portion of the term.
2.96.040 Chairperson.
The Committee shall elect its Chairperson and Vice Chairperson from among its Members [and. The Chairperson shall appoint a secretary].. Terms of the Chair and Vice Chair shall be for one year.
2.96.050 Meetings–Quorum.
A. The Committee shall hold regular meetings on a quarterly basis on and at the discretion of the Committee shall hold other meetings as may be necessary or expedient.
19 CC 03-18-2025
19 of 541
01276.0001/1059288.2 Attachment A – Page 3
B. A majority of the Committee shall constitute a quorum for the purpose of transacting the business of the Committee.
C. A special meeting may be called at any time by the chairpersonChairperson or by a majority of the Committee Members upon notice being given in advance in accordance with the provisions of the Ralph M. Brown Act or successor statute in effect at the time.
2.96.060 Majority Vote Required.
A majority vote of Committee Members present and voting is required to approve a recommendation on an y matter that is presented to the Committee that requires a vote.
2.96.070 Records.
The Committee shall keep an accurate record of its proceedings and transactions and shall render such reports to the City Council as may be required. These records shall be filed with the City Clerk.
2.96.080 Powers and Functions.
A. The powers and functions of the Committee shall be to serve in an advis ory
capacity to the City Council and to provide expertise and guidance on policy related to economic development. The Committee shall also actively promote Cupertino as a location of choice for current and prospective businesses.
B. To fulfill their mission, th
e Committee may involve itself in the following
activities:
1. Make recommendations to the City Council on a broad range of strategic matters broadly applicable to the City’s economic development goals;
2. Serve as an ambassador to shed a positive light on the City by sharing economic development resources and information to pr ospective
businesses and stakeholders, thus positioning the City as a location of choice; and
3. Encourage public/private partnerships to further the City’s economic development goals by identifying potential resources.
2.96.090 City Staff Assistance.
20 CC 03-18-2025
20 of 541
01276.0001/1059288.2 Attachment A – Page 4
The Committee shall have available to it such assistance of City staff as may be required to perform its functions, the staff assignments and administrative procedures to be under the general direction and supervision of the Economic Development Manager.
2.96.100 Compensation–Expenses.
Committee Members shall serve without com pensation. Committee Members may be reimbursed for necessary expenses reasonably incurred by them while acting in their official capacity subject to the approval of the City Manager.
2.96.110 Procedural Rules.
The Committee may adopt from time to time such rules of procedure as it may deem necessary to properly exercise its powers and duties. Su ch rules shall be kept on file with the Chairperson of the Committee, the Mayor, and the City Clerk, and a copy thereof shall be furnished to any person on request.
2.96.120 Effect.
Nothing in this Chapter shall be construed as restricting or curtailing any powers of th e City Council or City officers.
21 CC 03-18-2025
21 of 541
01276.0001/1059288.2
ORDINANCE NO. 25-____
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AMENDING CITY CODE TITLE 2
CHAPTER 2.96: ECONOMIC DEVELOPMENT COMMITTEE
The City Council of the City of Cupertino finds that:
1. The purpose of this Ordinance is to reestablish the Economic Development Committee (EDC).
2. An early formation of the EDC met informally for well over two decades to discuss items of importance pertinent to local businesses and to provide feedback to staff on business‐related City initiatives or projects. In 2022, the of EDC was formally codified in the Municipal Code through Ordinance 22 ‐2240
, by unanimous vote of the City Council . That
ordinance was later repealed on March 7, 2023, by Ordinance 23‐22
47. The
City Council has requested that the EDC be recodified in the Municipal Code through the adoption of a new ordinance.
NOW
, THEREFORE, THE CITY COUNCIL OF THE OF CITY OF CUPERTINO DOES ORDAIN AS FOLLOWS:
SECTION 1: Adoption.
The Cupertino Municipal Code is hereby amended to add Chapter 2.96 as set forth in Attachment A.
SECTION 2: Severability and Continuity.
The City Council declares that each section, sub ‐s ection, paragraph, sub ‐p aragraph, sentence, clause and phrase of this ordinance is severable and independent of every other section, sub
‐s
ection, paragraph, sub ‐p
aragraph, sentence, clause and phrase of thi s
ordinance. If any section, sub ‐s
ection, paragraph, sub ‐p
aragraph, sentence, clause or
phrase of this ordinance is held invalid, or its application to any person or circumstance, be determined by a court of competent jurisdiction to be unlawful, unenforc eable or otherwise void, the City Council declares that it would have adopted the remaining provisions of this ordinance irrespective of such portion, and further declares its express intent that the remaining portions of this ordinance should remain in effect after the invalid portion has been eliminated.
22 CC 03-18-2025
22 of 541
Ordinance No. ___________________
01276.0001/1059288.2
SECTION 3: California Environmental Quality Act.
This Ordinance is not a project under the requirements of the California Environmental Quality Act, together with related State CEQA Guidelines (collectively, “CEQA”) because it has no potential for resulting in physical change in the environment. In the event that this Ordinance is found to be a project under CEQA, it is subject to the CEQA exemption contained in CEQA Guidelines section 15061(b)(3) because it can be seen with certainty to have no possibility that the action approved may have a sign ificant effect on the environment. CEQA applies only to actions which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. In this circumstance, the amendments to the Municipal Code would have no or only a de minimis effect on the environment. The foregoing determination is made by the City Council in its independent judgment.
SECTION 4: Effective Date.
This Ordinance shall take effect thirty days after adoption as provided by Government Code Section 36937.
SECTION 5: Publication.
The City Clerk shall give notice of adoption of this Ordinance as required by law.
Pursuant to Government Code Section 36933, a summary of this Ordinance may be prepared by the City Clerk and published in lieu of publication of the entire text. The City Clerk shall post in the office of the City Clerk a certified copy of the full text of the Ordinance listing the names of the City Council members voting for and against the ordinance.
INTRODUCED at a regular meeting of the Cupertino City Council on March 18, 2025, and ENACTED at a regular meeting of the Cupertino City Council on ___________, by the following vote:
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
23 CC 03-18-2025
23 of 541
Ordinance No. ___________________
01276.0001/1059288.2
SIGNED:
_______________________________
Liang Chao, Mayor
City of Cupertino
_______________________________
Date
ATTEST:
_______________________________
Kirsten Squarcia, City Clerk
_______________________________
Date
APPROVED AS TO FORM:
_______________________________
Floy E. Andrews, City Attorney
_______________________________
Date
24 CC 03-18-2025
24 of 541
01276.0001/1059288.2 Attachment A – Page 1
ATTACHMENT A - Chapter 2.96: Economic Development Committee The sections of the Cupertino Municipal Code set forth below are amended or adopted as follows:
2.96.010 Established–Composition.
A. T
he Economic Development Committee of the City of Cupertino is re‐e stablished.
The Economic Development Committee (hereinafter referred to in this Chapter as “Committee”) shall consist of nine (9) members as follows:
1. City Councilmember
2. City Councilmember
3. Technology Sector Business Representative
4. Retail/Small Business Representative
5. Hospitality/Tourism Sector Representative
6. Education Sector Representative
7. Commercial Real Estate Representative
8. Sustainability Commissioner
9. Technology, Information, and Communications Commissioner B. The Committee shall be comprised of: (1) two Councilmembers; (2) one representative from each of the following industry sectors – Technology, Retail, Hospitality, Education, and Commercial Real Estate; and (3) one member who is currently serving on the Sustainability Commission; and (4) one member who is currently serving on the Technology, Information, and Communications Commissions. Industry sector representatives must work for an organization located within the City or be residents of the City, or both.
C. None of the industry sector representative Committee Members shall be officials or employees of the City. No member of the Committee shall cohabit with, as defined by law, nor be related by blood or marriage, to any other member of the Committee, to the City Manager, or to any staff person(s) who may be assigned to assist this Committee.
D. Members of the Committee shall be appointed by the City Council. 25 CC 03-18-2025
25 of 541
01276.0001/1059288.2 Attachment A – Page 2
2.96.020 Terms of Office.
A. Co
mmittee Members serve at the pleasure of the City Council. The term of office for Committee Members shall be staggered with the initial appointment of five members to two‐y
ear terms and four members to four‐y
ear terms. Following the
initial appointment, all members shall be appointed to four ‐y ear terms. If a
Committee Member is replaced or removed by Council, resigns, or is no longer eligible to serve on the Committee, Council shall appoint a replacement to serve the remaining period of the Committe e Member’s term. All terms shall end on January 30 of the year the term is due to expire. No Committee Member shall serve more than two consecutive terms, except that a Committee Member may serve more than two consecutive terms if he or she has been appointed to the Committee to fill an unexpired term of less than two years.
B. T
he appointment, reappointment, and rules governing industry sector representative Committee Members are governed by the Resolution of the Cupertino City Council which governs advisory bodies.
C. The City Council may in its discretion adopt different policies, procedures, and terms of service for the appointment of City Councilmembers and Commissioners to serve on the Committee.
2.96.030 Members–Vacancy or Removal.
Any Committee Member may be removed by a majority vote of the City Council. If a vacancy occurs, other than by expiration of a term, it shall be filled by the City Council’s appointment for the unexpired portion of the term.
2.96.040 Chairperson.
The Committee shall elect its Chairperson and Vice Chairperson from among its Members. The Chairperson shall appoint a secretary. Terms of the Chair and Vice Chair shall be for one year.
2.96.050 Meetings–Quorum.
A. The Committee shall hold regular meetings on a quarterly basis and at the discretion of the Committee shall hold other meetings as may be necessary or expedient.
B. A majority of the Committee shall constitute a quorum for the purpose of transacting the business of the Committee.
26 CC 03-18-2025
26 of 541
01276.0001/1059288.2 Attachment A – Page 3
C. A special meeting may be called at any time by the C hairperson or by a majority of the Committee Members upon notice being given in advance in accordance with the provisions of the Ralph M. Brown Act or successor statute in effect at the time.
2.96.060 Majority Vote Required.
A majority vote of Committee Members present and voting is required to approve a recommendation on any matter that is presented to the Committee that requires a vote.
2.96.070 Records.
The Committee shall keep an accurate record of its proceedings and transactions and shall render such reports to the City Council as may be required. These records shall be filed with the City Clerk.
2.96.080 Powers and Functions.
A. The powers and functions of the Committee shall be to serve in an advisory capacity to the City Council and to provide expertise and guidance on policy related to economic development. The Committee shall also actively promote Cupertino as a location of choice for current and prospective businesses.
B. To fulfill their mission, the Committee may involve itself in the following activities:
1. Make recommendations to the City Council on a broad range of strategic matters broadly applicable to the City’s economic development goals;
2. Serve as an ambassador to shed a positive light on the City by sharing economic development resources and information to prospective businesses and stakeholders, thus positioning the City as a location of choice; and
3. Encourage public/private partnerships to further the City’s economic development goals by identifying potential resources.
2.96.090 City Staff Assistance.
The Committee shall have available to it such assistance of City staff as may be required to perform its functions, the staff assignments and administrative procedures to be under the general direction and supervision of the Economic Development Manager. 27 CC 03-18-2025
27 of 541
01276.0001/1059288.2 Attachment A – Page 4
2.96.100 Compensation–Expenses.
Committee Members shall serve without compensation. Committee Members may be reimbursed for necessary expenses reasonably incurred by them while acting in their official capacity subject to the approval of the City Manager.
2.96.110 Procedural Rules.
The Committee may adopt from time to time such rules of procedure as it may deem necessary to properly exercise its powers and duties. Such rules shall be kept on file with the Chairperson of the Committee, the Mayor, and the City Clerk, and a copy thereof shall be furnished to any person on request.
2.96.120 Effect.
Nothing in this Chapter shall be construed as restricting or curtailing any powers of the City Council or City officers.
28 CC 03-18-2025
28 of 541
CITY COUNCIL INFORMATIONAL MEMORANDUM
Date: April 25, 2024
To: Cupertino City Council
From: PamelaWu, City Manager
Re: Economic Development Update
Background
On April 3, Council directed staff to prepare an informational memo outlining the ongoing efforts of the Economic Development Manager. Specifically, Council is interested in learning about programs in place to support local businessesin Cupertino andalongkeycommercialcorridors.
In thewakeof theCOVID-19pandemic, businesseshaveundergonesignificant transformations. The retail sector, in particular, is still evolving after taking a major hit due to the shutdowns and the growth of online shopping. Thesefactors prompted the Economic Development Manager, in conjunction with other departments, to embark on severalinitiativesaimedat fosteringsmallbusinessandretail revitalizationwithin Cupertino.
Serving asthe conduit between city government and the private sector, Economic Development plays a crucial role in understanding the needsof our local businessesand tailoring programs to support them. Basedon outreach conducted, the top needsoften highlightedby businessesincludemarketing, technicalassistance, andpermit support.
Belowis adetailedoverviewof theCity’seffortsto tackletheseneedscategorizedby outreach, programs, andpartnerships.
LocalBusinessOutreach & Engagement
Throughstrategicavenuessuchaspersonalizedbusinessvisits, informativenewsletters, andinteractiveonlinebusinessmaps, EconomicDevelopmentcreatesrobustplatforms to provide exposureto businesses, andofferanopportunity for themto collaborate, share insights, and accessessentialresources. Somenotable businessengagements include Sun Design Center, WOW! Tea, Wei’s Fish, Mirapath, and House of Miracles.
Furthermore, Economic Development leveragesnetworks within the commercial real 29 CC 03-18-2025
29 of 541
estateindustry to bolster recruitment and fill vacanciesalong key commercial corridors.
Belowareafew examplesof programsthatpromoteoutreachandengagement:
Cupertino BusinessOutreach Program
EconomicDevelopmentE-Newsletter
Online SearchableBusinessMap
Promote events such asNational Small BusinessWeek and Small Business Saturday to remind our community to shop local.
Attend networking events to stay apprised of the latest trends in the retail industry such asthe International Conferenceof Shopping Center.
BusinessAssistancePrograms & Events
To further support the startup and growth of local businessesin Cupertino, the Economic Development Manager connectsbusinessesto a broad portfolio of technical assistanceprograms. Theseprogramsaretypically facilitatedthroughworkshopsand webinars. Additionally, theEconomicDevelopmentManagerfacilitateseventsto foster networkingandcollaborationamonglocalbusinessowners, aimingto equipthemwith the knowledge, resources, and connections vital for their growth and prosperity. Below is an overview of recent and upcoming businessassistanceprograms and events:
ADA Webinar
RetailTheftPreventionWebinar
SmallBusinessWorkshopSeries
Commercial RealEstateBroker Breakfast
Professional Women’s Luncheon
Green RebatesWorkshop
Working with City DepartmentsandOutsidePartners
Partnerships are integral to the City’s economic development efforts and facilitate collaboration, efficiency, and resourceoptimization. This includes inter- departmental collaboration in areaslike permit facilitation, ensuring local businessescan navigate the regulatoryprocessessmoothly. Notably, localbusinessesalongkeycommercial corridorslike ShaneCompany, Di Vittorio Enterprises, Toby’sBoardgame, 76Gas Station, andApple havebenefitedfrom shorterreviewcycles, expeditedplan reviews, and faster permit issuancedue to this collaborative approach. Additionally, partnerships with outside organizations enable staff to offer robust programs and servicesto local businessesin need of additional assistanceand resources. There are a variety of partnershipslistedbelowwhich supporttheCity’seconomicdevelopmentinitiatives.
Inter-Departmental Collaboration and Permit Facilitation CupertinoChamberof Commerce
CupertinoBusinessConnectPlatform
30 CC 03-18-2025
30 of 541
Applied Development EconomicsMarket Study
Native Digital StrategicCommunication Support
As outlinedabove, theEconomicDevelopmentManager, working hand-in-handwith internalandexternalpartners, offersanextensiverangeof supportto fosterbusiness revitalization along key commercial corridors and citywide.
Looking ahead, Economic Development will continue to engagewith the business communityby introducingnew outreach, programs, andpartnerships. Tofurther boost retail recruitmentandtackleground-floor vacancies, theCity’sfuture effortscouldfocus alongmajorcommercialcorridors, including the “Heartof theCity” area, wheremostof the City’s shopping centersare located. Theseproactive approacheswill be vital aslocal businessescontinue to adapt to today’s dynamic economic environment.
Prepared by: Daniel Degu, Economic Development Manager
Reviewed by: Tina Kapoor, Deputy City Manager
Matt Morley, Assistant City Manager
Approved for Submission by: PamelaWu, City Manager
Attachments: None
31 CC 03-18-2025
31 of 541
CITY OF CUPERTINO
Agenda Item
25-13740 Agenda Date: 3/18/2025
Agenda #: 2.
Subject: Study Session to consider reestablishing the City’s Legislative Review Committee.
Provide staff direction on reestablishing the Legislative Review Committee and direct the City Attorney to consider the impact of Municipal Code Section 2.17.031 on any reestablished Legislative Review Committee.
CITY OF CUPERTINO Printed on 3/13/2025Page 1 of 1
powered by Legistar™
32 CC 03-18-2025
32 of 541
01276.0001/1059297.4
CITY COUNCIL STAFF REPORT
Meeting: March 18, 2025
Subject
Study Session to consider reestablishing the City’s Legislative Review Committee.
Recommended Action
Provide staff direction on reestablishing the Legislative Review Committee and direct the City Attorney to consider the impact of Municipal Code Section
2.17.031 on any reestablished Legislative Review Committee.
Background
In 2018, the City Council passed a Legislative Advocacy Policy, which created what was originally known as the Legislative Advocacy Committee to make recommendations on legislative issues that could impact the City and its residents. Thereafter, the Legislative Advocacy Committee became known as the Legislative Review Committee.
In 2023, the City Council revisited the City’s Legislative Advocacy Policy, opining that the delegation of authority to the Legislative Review Committee was inconsistent with Municipal Code Section 2.17.031, which states that the authority of the City Council “cannot be delegated to individual Council members, nor to committees composed of council members consisting of less than a quorum of the City Council.”
Reason for Recommendation
The City Council has an interest in weighing in on state, federal and regional legislative issues that impact the City and its residents. But the Mayor, Councilmembers, and staff may be unable to respond to legislative issues in a timely manner when legislative positions must be considered by the full Council.
Recreating a Legislative Review Committee may be useful in bridging that gap, 33 CC 03-18-2025
33 of 541
01276.0001/1059297.4
whereby the Legislative Review Committee might assist the City in responding to legislative proposals that might impact the City.
Next Steps
Following this study session, staff will incorporate Council’s direction into a proposed action, which if appropriate, will be brought back to Council for further action.
Sustainability Impact
No sustainability impact.
Fiscal Impact
There are no fiscal impacts as part of this study session.
Environmental Quality Act
Not applicable.
_____________________________________
Prepared by: Floy Andrews, City Attorney
Reviewed by: Tina Kapoor, Deputy City Manager
Approved for Submission by: Pamela Wu, City Manager
No Attachments
34 CC 03-18-2025
34 of 541
CITY OF CUPERTINO
Agenda Item
25-13742 Agenda Date: 3/18/2025
Agenda #: 1.
Subject: Receipt of annual report of activities from West Valley Community Services (WVCS) and recognition for 51 years of dedicated community service Receive annual report of activities from WVCS and present proclamation recognizing 51 years of dedicated community service
CITY OF CUPERTINO Printed on 3/13/2025Page 1 of 1
powered by Legistar™
35 CC 03-18-2025
35 of 541
36 CC 03-18-2025
36 of 541
CITY OF CUPERTINO
Agenda Item
25-13788 Agenda Date: 3/18/2025
Agenda #: 2.
Subject: Approval of March 3, 2025 City Council minutes and Workshop Summary Approve the March 3, 2025 City Council minutes and Workshop Summary CITY OF CUPERTINO Printed on 3/13/2025Page 1 of 1
powered by Legistar™
37 CC 03-18-2025
37 of 541
DRAFT MINUTES
CUPERTINO CITY COUNCIL
Monday, March 3, 2025
SPECIAL M
EETING
At 5:01 p.m., Mayor Liang Chao called the Special City Council Meeting to order in the Cupertino Community Hall Council Chamber, 10350 Torre Avenue and via teleconference.
ROLL CALL
Present: Mayor Liang Chao, Vice Mayor Kitty Moore, and Councilmembers J.R. Fruen, Sheila Mohan, and Ray Wang. Absent: None.
COUNCIL WORKSHOP
1. Subject: FY 2025-2027 City Work Program Prioritization and Goal Setting Workshop Recommended Action: 1. Confirm City’s Strategic Vision
2. Adjust or Re-Affirm Council Goals
3. Finalize Council Priorities for Fiscal Years 2025-2027
Written communications for this item included a staff presentation, emails to the Council, and the following desk items:
• Supplemental S taff Report - Fiscal Years ( FY) 2025- 2027 City Work Program Prioritization and Goal Setting Workshop
• Attachment D - Ranking sheet from Councilmember Mohan • Attachment E - Ranking sheet from Vice Mayor Moore
• Attachment F - Revised Consolidated List for Ranking
• Final Ranking Sheet from the Workshop 3.3.25
• Middle Ranking Sheet from Workshop 3.3.25
City Manager Pamela Wu introduced the item and Deputy City Manager Tina Kapoor gave a presentation.
The Council reviewed resources on effective City governance.
Councilmembers discussed developing and adopting a strategic vision framework to 38 CC 03-18-2025
38 of 541
City Council Minutes March 3, 2025
guide decision-making and long-term planning.
MOTION: Fruen moved and Moore seconded to confirm Strategic Vision Option 2:
• Public Engagement & Transparency
• Transportation
• Housing
• Quality of Life
• Environmental Sustainability
• Fiscal Strategy
Focus Areas:
• Fiscal Resilience
• Small Business Revitalization
• Emergency Management
The motion passed with the following vote: Ayes: Chao, Moore, Fruen, Mohan, and Wang. Noes: None. Abstain: None. Absent: None.
Councilmembers asked questions and made comments.
The Council conducted a straw vote on whether to remove the City Hall r etrofit project from the City Work Program and potentially add to the CIP list. Ayes: Chao, Moore, and Wang. Noes: Fruen and Mohan.
Mayor Chao opened the public hearing and the following people spoke.
Eric Zhang, representing Silicon Valley Youth Climate Action , discussed prioritizing sustainability and climate action.
Anoop Singhal, Doug, Albert, John, and Judy, representing the Cupertino Pickleball Club, discussed prioritizing pickleball activities.
Bianca, Danny, Meaghan, Kate, Diana representing Cupertino Pickleball Club discussed prioritizing pickleball activities.
Erika Kristaly, Craig Davis, Chris tine, Ch en, and Susan Li discussed prioritizing pickleball activities.
Frank Chu , representing Cupertino Pickleball Club discussed prioritizing pickleball activities.
Jennifer Griffin discussed prioritizing adopting Level of Service (LOS).
39 CC 03-18-2025
39 of 541
City Council Minutes March 3, 2025
David Lim, representing Cupertino Pickleball Club, discussed prioritizing pickleball activities.
Dashiell Leeds , representing S ierra Club, discussed prioritizing environmental sustainability.
Planning Commissioner San R (representing self) discussed pickleball activities and prioritizing public noticing, urban forest, and Blackberry Farm facilities use.
Planning Commissioner Tracy Kosolcharoen (representing self) discussed prioritizing City Hall retrofit/EOC readiness, Memorial Park renovation, and economic development.
Mayor Chao closed the public hearing.
Councilmembers discussed conducting a priority ranking exercise to identify and align Council’s top projects with community needs and available resources.
At 7:00 p.m., Mayor Chao recessed the meeting for Councilmembers to rank their top projects and for staff to compile a consolidated list (Final Ranking Sheet ). The meeting reconvened at 7:50 p.m. with all councilmembers present.
Councilmembers reviewed the Final Ranking Sheet, which was prepared during the break. Items were sorted in priority order and separated into High, Medium, and Low priority projects. Council agreed to forego the low priority projects and move the high priority projects forward.
Chao requested an informational memo on Blackberry Farm’s picnic area and swimming pool usage including the history of restricted operation s, settlement offer details, operational costs, revenue, and expenses for current and previous year.
At 8:49 p.m., Mayor Chao recessed the meeting to allow Councilmembers to rank the medium priority projects again (Middle Ranking Sheet). The meeting reconvened at 9:04 p.m. with all Councilmembers present.
Councilmembers discussed the Middle Ranking Sheet , which was prepared during the break.
Council agreed to add the top six medium projects to the already approved h igh priority projects, which resulted in a list of top 19 projects ( the top 18 items plus a City Hall project).
40 CC 03-18-2025
40 of 541
City Council Minutes March 3, 2025
MOTION: Moore moved and Wang seconded the staff recommendation as amended to:
1. Confirm the City’s Strategic Vision;
2. Adjust or Re-Affirm Council Goals; and
3. Finalize the Council Priorities for Fiscal Years 2025-2027.
Amendments to Item 13 from the Consolidated Revised Top 10 List:
• Revised title: City Hall Retrofit and City Hall Annex Renovation including the EOC
• Item description: Implement the previously approved 2022 Council plan with EOC migration
FRIENDLY AMENDMENT: Chao made a f riendly amendment that, in addition to the top 18 items, to also include the remaining items in black for consideration; the item will return to Council to finalize the FY 2025 -2027 CWP on March 18, 2025 . (Wang seconded the friendly amendment).
The amended motion passed with the following vote: Ayes: Chao, Moore, and Wang.
Noes: Fruen and Mohan. Abstain: None. Absent: None.
A summary of the workshop and the strategic vision is available in Exhibit A (attached).
ADJOURNMENT
At 9:18 p.m. Mayor Chao adjourned the Special City Council meeting.
Minutes prepared by:
_________________________
Kirsten Squarcia, City Clerk
41 CC 03-18-2025
41 of 541
EXHIBIT A
Council Priority Setting Workshop Summary
On March 3, the City Council participated in a Priority Setting Workshop facilitated by Deputy City Manager, Tina Kapoor. The workshop provided an opportunity for Councilmembers to celebrate the current City Work Program (CWP) progress, discuss priority projects of importance, and conduct rank voting to establish the CWP for FY 2025 -26 and FY 2026 -27.
Council also directed staff to return to Council to finalize the FY 2025-2027 CWP on March 18, 2025.
Workshop Objectives
The Workshop focused on the following objectives:
• Reviewing resources on effective City governance.
• Developing and adopting a strategic vision framework to guide decision-making and long-term planning.
• Conducting a priority ranking exercise to identify and align Council’s top projects with community needs and available resources.
Workshop Outcomes
1. Effective City Governance: Staff presented best practices and strategies from Institute for Local Government to promote collaboration, transparency, and effective governance.
These included approaches for handling policy and operational matters efficiently.
2. City Council Goals: Councilmembers then reviewed the existing five City Council Goals and unanimously voted on staff’s recommendation to split their existing goal of “Sustainability and Fiscal Strategy” into two separate goals -- Environmental Sustainability and Fiscal Strategy.
3. Focus Areas: Staff introduced three new focus areas as part of the Strategic Vision Framework – Fiscal Resilience, Small Business Revitalization, and Emergency Management. These were unanimously adopted by Council and will help guide strategic initiatives and resource allocation to better serve the community.
4. Strategic Vision Framework: Following a discussion on long-term Goals and Focus Areas, the Council unanimously adopted a Strategic Vision Framework that will serve as a foundation for guiding policy decisions and organizational priorities.
5. Priority Project Ranking Exercise: Councilmembers engaged in a structured ranking process to identify priority projects for the upcoming two fiscal years. The results of this 42 CC 03-18-2025
42 of 541
exercise will inform the City’s budget and Work Plan to ensure alignment with Council’s vision and strategic goals. The ranking exercise is detailed below:
Ranking Exercise
At the workshop, Council ranked their top projects, using the Council adopted methodology.
After the first ranking, items were sorted in priority order and separated into high, medium, and low priority projects. Council agreed to forego the low priority projects and move the high priority projects forward. Council then ranked the medium priority projects again. Once that ranking was finalized, Council agreed to add the top six medium projects to the already approved high priority projects, which resulted in a list of top 19 projects. All ranking lists were posted as part of written communication following the Workshop. Additional information can be found on the City Work Program website.
Strategic Vision Framework
The Strategic Vision and newly adopted goals can be found on the city’s Vision and Goals website, as illustrated below.
43 CC 03-18-2025
43 of 541
CITY OF CUPERTINO
Agenda Item
24-13586 Agenda Date: 3/18/2025
Agenda #: 3.
Subject: Approval of March 4, 2025 City Council minutes Approve the March 4, 2025 City Council minutes
CITY OF CUPERTINO Printed on 3/13/2025Page 1 of 1
powered by Legistar™
44 CC 03-18-2025
44 of 541
DRAFT MINUTES
CUPERTINO CITY COUNCIL
Tuesday, March 4, 2025
At 6:45 p.m., Mayor Liang Chao called the Regular City Council Meeting to order and led the Pledge of Allegiance in the Cupertino Community Hall Council Chamber, 10350 Torre Avenue and via teleconference.
ROLL CALL
Present: Mayor Liang Chao, Vice Mayor Kitty Moore, and Councilmembers J.R. Fruen, Sheila Mohan, and R “Ray” Wang. Absent: None.
CLOSED SESSION REPORT – None
CEREMONIAL ITEMS
1. Subject: Recognition of March as Youth Art Month
Recommended Action: Present proclamation recognizing March as Youth Art Month
Barbara Flores, Director of iSTEAM, made comments and accepted the proclamation on behalf of the Santa Clara County Office of Education (SCCOE).
Mayor Chao presented the proclamation recognizing March as Youth Art Month.
2. Subject: Recognition of March as American Red Cross Month Recommended Action: Present proclamation recognizing March as American Red Cross Month
Written communications for this item included a presentation.
Stuart Chessen, lifelong volunteer, gave a presentation and accepted the proclamation on behalf of the American Red Cross, Pacific Division.
Mayor Chao presented the proclamation recognizing March as American Red Cross Month.
45 CC 03-18-2025
45 of 541
March 4, 2025 City Council Minutes
POSTPONEMENTS AND ORDERS OF THE DAY
MOTION: Wang moved and Mohan seconded to table Item 5 to consider a resolution declaring properties as having potential fire hazards from brush and setting a hearing date to declare brush with potential fire hazard a public nuisance to date to be determined. The motion passed with the following vote: Ayes: Chao, Moore, Fruen, Mohan, and Wang. Noes: None. Abstain: None.
Absent: None.
ORAL COMMUNICATIONS
Written communications for this item included emails forwarded by Councilmembers.
The following members of the public spoke:
Ahmad Yazd discussed fire hazard severity zones and Evulich Court development.
Parimal Kopardekar discussed fire hazard severity zones and Evulich Court development.
Mark Fantozzi discussed fire hazard severity zones and Evulich Court development.
Ying Sosic discussed fire hazard severity zones and Evulich Court development.
Jennifer Griffin discussed proposed project revisions at Westport Cupertino
Maria Wong discussed a flag incident in the neighborhood.
Greg Updegraff discussed parking at Westport Cupertino.
Gilli Yahalam , representing The Bay Area Jewish Coalition , discussed a flag incident in the neighborhood.
Olga discussed a flag incident in the neighborhood.
Rey Mali discussed a flag incident in the neighborhood.
Planning Commissioner San R (representing self) discussed various topics prioritizing quality of life and public safety, 4
th of July event, and Blackberry Farm facilities.
David Y discussed fire hazard severity zones and Evulich Court development.
46 CC 03-18-2025
46 of 541
March 4, 2025 City Council Minutes
Planning Commissioner Tracy K (representing self) discussed an informational memo to the Council on the Recycled Water Feasibility Study, dated February 14, 2025.
Mayor Chao requested an informational memo on parking along Mary Avenue near the Westport senior housing development.
CONSENT CALENDAR (Items 3-6)
Mayor Chao opened the public comment and, seeing no one, closed the public comment period.
MOTION: Moore moved and Wang seconded to adopt I tems 3 , 4, and 6 on the Consent Calendar. The motion passed with the following vote: Ayes: Chao, Moore, Fruen, Mohan, and Wang. Noes: None. Abstain: None. Absent: None.
3. Subject: Approval of February 12, 2025 City Council minutes Recommended Action: Approve the February 12, 2025 City Council minutes
4. Subject: Approval of February 19, 2025 City Council minutes Recommended Action: Approve the February 19, 2025 City Council minutes
5. Subject: Setting a hearing date of June 17, 2025 to declare brush with potential fire hazard a public nuisance and for objections to proposed removal through the Cupertino Brush Abatement Program (Wildland- Urban Interface Fire Area); and adopting a resolution declaring properties as having potential fire hazards from brush and authorizing removal
Recommended Action : Adopt Resolution No 25 -017 declaring properties as having potential fire hazards from brush; and set a hearing date of June 17, 2025 to declare brush with potential fire hazard a public nuisance and to hear objections to proposed removal
Written communications for this item included a desk item report.
As noted under Postponements and Orders of the Day, this item was tabled to a date to be determined.
6. Subject: Second reading for Zoning Map Amendment to correct zoning for Priority Housing Site No. 24 in the 6th Cycle Housing Element (Application No.(s): Z -2024-001, EA-2024-001; Applicant: City of Cupertino; APN: 359 13 019; Location: 20865 McClellan Road)
Recommended Action: Conduct the second reading and enact Ordinance No. 25 -2268:
“AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
CORRECTING THE ZONING OF A PRIORITY HOUSING ELEMENT SITE LOCATED 47 CC 03-18-2025
47 of 541
March 4, 2025 City Council Minutes
AT 20865 MCCLELLAN ROAD FROM R -3 TO R -3/TH TO ENSURE CONSISTENCY WITH THE GENERAL PLAN AND HOUSING ELEMENT”
PUBLIC HEARINGS – None
ACTION CALENDAR
7. Subject: Baker Tilly Budget Format Review and Performance Measures Updates Recommended Action: Approve recommendations outlined in the recent the Budget Format Review and Performance Measures Updates report as prepared by Baker Tilly
Written communications for this item included an updated presentation, supplemental report with staff responses to councilmember questions, Amended Attachment G – Competitive and Non-Competitive Citywide Grants Tracking, and emails to the Council.
Director of Administrative Services Kristina Alfaro and Steve Toler , Director with Baker Tilly, gave a presentation.
Councilmembers asked questions and made comments.
Mayor Chao opened the public comment period and the following people spoke.
Planning Commissioner San R (representing self)
Mayor Chao closed the public comment period.
MOTION: Chao moved and Fruen seconded to approve the recommendations, as amended, outlined in the recent Budget Format Review and Performance Measures Updates report as prepared by Baker Tilly.
Moore’s amendments to the Draft Implementation Action Plan:
• Item 12, Remove the full financial policies to retain in an appendix with the budget and any revision dates
• Item 15, Review the architecture and links in OpenGov to ensure accuracy • Item 18, Eliminate the program budget information in the departmental sectio ns (pages 23 to 29) – Hold off on this for a while
• Capital Improvement Program (CIP) item - set as a priority one, if possible • Quarterly tracking of the CIP priorities - set as a priority two instead of priority three • Item 26, Special Projects Policy - set as a priority one instead of a priority three
FRIENDLY AMENDMENT: Moore made a friendly amendment for the Council to 48 CC 03-18-2025
48 of 541
March 4, 2025 City Council Minutes
conduct a study session to review the Performance Measures Updates in Q1 (Chao and Fruen accepted the friendly amendment).
The amended motion passed with the following vote: Ayes: Chao, Moore, Fruen, Mohan, and Wang. Noes: None. Abstain: None. Absent: None.
At 9:07 p.m., Mayor Chao recessed the meeting. The meeting reconvened at 9:13 p.m. with all Councilmembers present.
8. Subject: Accept the City Manager’s Mid -Year Financial Report for Fiscal Year 2024-25; Budget Modification No. 2425-383, increasing appropriations by $4,161,892 and revenues by $4,115,183.
Recommended Action: 1. Accept the City Manager’s Mid -Year Financial Report for Fiscal Year 2024-25
2. Adopt Resolution No. 25-018 approving Budget Modification No. 2425-383, increasing appropriations by $4,161,892 and revenues by $4,115,183.
Written communications for this item included a staff presentation, a supplemental report with staff responses to councilmember questions, and emails to the Council.
Director of Administrative Services Kristina Alfaro and Acting Budget Manager Toni Oasey-Anderson gave a presentation.
Councilmembers asked questions and made comments.
Mayor Chao opened the public comment period and the following people spoke.
Jean Bedord
Planning Commissioner San R (representing self)
Mayor Chao closed the public comment period.
MOTION: Mohan moved and Fruen seconded to:
1. Accept the City Manager’s Mid-Year Financial Report for Fiscal Year 2024-25
2. Adopt Resolution No. 25-018 approving Budget Modification No. 2425-383, increasing appropriations by $4,161,892 and revenues by $4,115,183.
The motion passed with the following vote: Ayes: Chao, Moore, Fruen, and Mohan. Noes:
Wang. Abstain: None. Absent: None.
9. Subject: Amendments to the Cupertino City Council Procedures Manual (Continued from February 19, 2025 City Council Meeting)
Recommended Action: Adopt Resolution No. 25-016 amending the Cupertino City 49 CC 03-18-2025
49 of 541
March 4, 2025 City Council Minutes
Council Procedures Manual
Written communications for this item included a staff presentation, Mayor Chao’s and Councilmember Mohan’s comments on Council Procedures Manual revisions, and emails to the Council.
City Attorney Flow Andrews gave a presentation.
Mayor Chao opened the public comment period and the following people spoke.
Jean Bedord
Planning Commissioner San R (representing self)
Mayor Chao closed the public comment period.
Councilmembers asked questions and made comments.
MOTION: Fruen moved and Mohan seconded a motion to overrule the Chair. The motion failed with the following vote: Ayes: Fruen and Mohan. Noes: Chao, Moore, and Wang.
Abstain: None. Absent: None.
MOTION: Chao moved and Moore seconded to approve the redlined version included in the agenda packet, with modifications.
Chao’s modifications:
• 8.7.1 Councilmembers. “During public meetings, Councilmembers shall not text or otherwise communicate privately with any Public official….” • 8.3 Order of Business. 15. Future Agenda Items, “….Councilmember Reports,… may include other matters serving the constituents….”
• 8.1 Meeting Schedule. “At prior to the second regular meeting in January,…” • 8.4.2 Removing Item from Consent Calendar. “Items may be removed from the consent calendar by a member of the City Council….”
• 8.4.3 Questions and Comments. Councilmembers shall be given the opportunity to ask a clarifying question about a consent calendar item or make a brief comment…”
• 8.5 Public Comment. “…two or moreup to five members of the public” can combine their time
The m odified motion passed with the following vote: Ayes: Chao, Moore, and Wang.
Noes: Fruen and Mohan. Abstain: None. Absent: None.
MOTION: Chao and Wang moved to extend the meeting until 11:30 p.m. to continue discussion on the item. The motion passed with the following vote: Ayes: Chao, Moore, and Wang. Noes:
50 CC 03-18-2025
50 of 541
March 4, 2025 City Council Minutes
Fruen and Mohan. Abstain: None. Absent: None.
SUBSTITUTE MOTION: Chao made a substitute motion to extend the meeting until 11:15 p.m. to continue discussion on the item. The substitute motion was not considered for l ack of a second.
MOTION: Wang moved and Moore seconded to continue discussion of Chao’s additional proposed amendments to the Cupertino City Council Procedures Manual to a future meeting or the next meeting, if possible. The motion passed with the following vote: Ayes:
Chao, Moore, and Wang. Noes: Fruen and Mohan. Abstain: None. Absent: None.
STUDY SESSION
10. Subject: Study Session on updates to the Policies and Guidelines on Sister Cities, Friendship Cities, and International Delegations pertaining to international travel Recommended Action: Study Session to consider, discuss and provide direction on revisions to the Policies and Guidelines on Sister Cities, Friendship Cities, and International Delegations pertaining to 1) international travel, including the addition of appropriate prior approvals for travel expenses and staff time away from usual duties at the City, and other related matters, and 2) staff time focused on supporting delegation visits to the City from Sister Cities and Friendship Cities
Written communications for this item included emails to the Council.
Mayor Chao introduced the item.
Mayor Chao opened the public comment period and the following people spoke.
Planning Commissioner San R (representing self)
Gilbert Wong
Mayor Chao closed the public comment period.
Councilmembers asked questions and made comments.
MOTION: Chao moved and Wang seconded to continue the item and provide direction to staff to bring back a redlined version with Chao’s proposed changes for Council consideration.
FRIENDLY AMENDMENT: Wang made a friendly amendment to bring the item back in one month. (Chao accepted the friendly amendment).
51 CC 03-18-2025
51 of 541
March 4, 2025 City Council Minutes
The amended motion passed with the following vote: Ayes: Chao, Moore, Mohan, and Wang. Noes: Fruen. Abstain: None. Absent: None.
ADJOURNMENT
At 11:31 p.m. Mayor Chao adjourned the Regular City Council Meeting per rule. There was no Council discussion on the remaining agenda items.
ITEMS REMOVED FROM THE CONSENT CALENDAR – None
CITY MANAGER REPORT
The Council did not hear this item.
ORAL COMMUNICATIONS - CONTINUED – None
COUNCILMEMBER REPORTS
11. Subject: Councilmember Reports
Councilmembers reported on their various committees and events as provided in the published agenda.
FUTURE AGENDA ITEMS
The Council did not hear this item.
As noted under O ral Communications, Mayor Chao requested an informational memo on parking along Mary Avenue near the Westport senior housing development.
Minutes prepared by:
_________________________
Kirsten Squarcia, City Clerk
52 CC 03-18-2025
52 of 541
CITY OF CUPERTINO
Agenda Item
25-13702 Agenda Date: 3/18/2025
Agenda #: 4.
Subject: Ratifying Accounts Payable for the periods ending February 14, 2025 and February 28, 2025 A. Adopt Resolution No. 25-019 ratifying Accounts Payable for the Period ending February 14, 2025; and
B. Adopt Resolution No. 25-020 ratifying Accounts Payable for the Period ending February 28, 2025
CITY OF CUPERTINO Printed on 3/13/2025Page 1 of 1
powered by Legistar™
53 CC 03-18-2025
53 of 541
CITY COUNCIL STAFF REPORT
Meeting: March 18, 2025
Subject
Ratifying Accounts Payable for the periods ending February 14, 2025 and February 28, 2025
Recommended Action
A. Adopt Resolution N o. 25-XXX ratifying Accounts Payable for the Period ending February 14, 2025; and
B. Adopt Resolution N o. 25-XXX ratifying Accounts Payable for the Period ending February 28, 2025
Discussion
Unlike the Monthly Treasurer’s and Treasruer’s Investment Reports that require regular reporting within a specific number of days, pursuant to California Government Code Section 41004 and 53607, the frequency of reporting the City’s Payment Register follows Resolution No. 5939which provides that the report will be “presented to the City Council not less often than once a month for ratification.” As such, monthly batches of Payment Registers are presented to City Council at the second meeting following the close of the reporting period to ensure sufficient time to present the previous month's batches within one report.
Sustainability Impact
No sustainability impact.
Fiscal Impact
No fiscal impact.
California Environmental Quality Act
Not applicable.
City Work Program (CWP) Item:
Not a CWP item.
CWP Item Description:
54 CC 03-18-2025
54 of 541
Not Applicable.
Council Goal:
Not Applicable.
_____________________________________
Prepared by: Jonathan Orozco, Finance Manager
Reviewed by: Kristina Alfaro, Director of Administrative Services and City Treasurer Approved for Submission by: Pamela Wu, City Manager
A – Draft Resolution 2.14.25
B – AP Payment Register for the Period Ending 2.14.25
C – Draft Resolution 2.28.25
D – AP Payment Register for the Period Ending 2.28.25
55 CC 03-18-2025
55 of 541
RESOLUTION NO. 25-XXX
A RESOLUTION OF THE CUPERTINO CITY COUNCIL
RATIFYING CERTAIN CLAIMS AND DEMANDS PAYABLE IN THE
AMOUNTS AND FROM THE FUNDS AS HEREINAFTER DESCRIBED FOR
GENERAL AND MISCELLANEOUS EXPENDITURES FOR THE PERIOD
ENDING FEBRUARY 14, 2025
WHEREAS, the Director of Administrative Services or their designated representative has certified to accuracy of the following claims and demands and to the availability of funds for payment hereof; and
WHEREAS, the said claims and demands have been audited as required by law.
NOW, THEREFORE, BE IT RESOLVED that the City Council does hereby ratify the following claims and demands in the amounts and from the funds as hereinafter set forth in the attached Payment Register.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 18
th day of March, 2025 by the following vote:
Vote Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
SIGNED:
________
Liang Chao, Mayor
City of Cupertino
________________________
Date
ATTEST:
________
Kirsten Squarcia, City Clerk
________________________
Date
56 CC 03-18-2025
56 of 541
Resolution No. 25-XXX
CERTIFICATION
The Finance Manager hereby certifies to the accuracy of said records and to the availability of funds for payment.
CERTIFIED:
Jonathan Orozco, Finance Manager
57 CC 03-18-2025
57 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Main Account - Main Checking Account
Check
736076 02/14/2025 Open Accounts Payable Advantage Grafix $106.94 Invoice Date Description Amount
49212 01/23/2025 Business cards for Pamela Wu $106.94
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$106.94
736077 02/14/2025 Open Accounts Payable ALHAMBRA $138.61 Invoice Date Description Amount
4984729 011825 01/18/2025 Employee Drinking Water for QCC - Current Balance Only
$138.61
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$138.61
736078 02/14/2025 Open Accounts Payable ALHAMBRA $14.90 Invoice Date Description Amount
14628570 012325 01/23/2025 Employee Drinking Water for BBF - Current Balance Only
$14.90
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$14.90
736079 02/14/2025 Open Accounts Payable AM Signal, LLC $10,152.21 Invoice Date Description Amount
M29764 01/17/2025 PW Traffic Division: TC-800 Speed Signs + Mounts $10,152.21 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$10,152.21
736080 02/14/2025 Open Accounts Payable AT&T $7,460.43
Invoice Date Description Amount
000022865953 01/12/2025 9391023221 (408-253-9200) 12/12/24-1/11/25 $66.86 000022865955 01/12/2025 9391023223 12/12/24-1/11/25 $93.04 000022866049 01/12/2025 9391023218 (238-371-7141) 12/12/24-1/11/25 $64.10 000022866050 01/12/2025 9391023217 (237-361-8095) 12/12/24-1/11/25 $81.36 000022866051 01/12/2025 9391023216 (233-281-5494) 12/12/24-1/11/25 $65.68 000022866052 01/12/2025 9391023215 (233-281-4421) 12/12/24-1/11/25 $83.37 000022866920-0 01/12/2025 9391066758 - 4087771305 | | 10185 N STELLING RD - Secure FAX
$20.57
000022866920-1 01/12/2025 9391066758 - 4087771306 | | 10185 N STELLING RD - Sheriff
$20.59
000022866920-2 01/12/2025 9391066758 - 4087771307 | | 10185 N STELLING RD - Sheriff
$20.59
000022866920-3 01/12/2025 9391066758 - 4087771311 | | 22221 MC CLELLAN RD - Environmental
$25.68
000022866920-4 01/12/2025 9391066758 - 4087771318 | | 10555 MARY AV - Traffic Operating Ce
$36.59
000022866920-5 01/12/2025 9391066758 - 4087771331 | | 21975 SAN FERNANDO AV - BBF- Kiosk A
$21.09
Tuesday, February 18, 2025Pages: 1 of 30user: Vi Tran 58 CC 03-18-2025
58 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
000022866920-6 01/12/2025 9391066758 - 4087771340 | | 10555 MARY AV - Alarm- Service Cente
$20.72
000022866920-7 01/12/2025 9391066758 - 4087771344 | | 21251 STEVENS
CREEK BL - SEN - FAX
$20.59
000022866920-8 01/12/2025 9391066758 - 4087771345 - CH- PG&E Meter $20.74 000022866920-9 01/12/2025 9391066758 - 4087771346 | | 21111 STEVENS CREEK BL - SPORTS Cent
$20.74
000022866920-10 01/12/2025 9391066758 - 4087771348 | | 10555 MARY AV - Alarm- Service Cente
$21.94
000022866920-11 01/12/2025 9391066758 - 4087771355 | | 10555 MARY AV - Mechanic Shop FAX
$20.59
000022866920-12 01/12/2025 9391066758 - 4087773102 | | 10185 N STELLING RD - Museum/Spare
$20.59
000022866920-13 01/12/2025 9391066758 - 4087773103 | | 10185 N STELLING RD - Museum/Spare
$20.59
000022866920-14 01/12/2025 9391066758 - 4087773109 - FAX $20.59 000022866920-15 01/12/2025 9391066758 - 4087773112 | | 21111 STEVENS CREEK BL - SPORTS- Fir
$21.82
000022866920-16 01/12/2025 9391066758 - 4087773113 | | 21111 STEVENS CREEK BL - SPORTS- Fir
$20.89
000022866920-17 01/12/2025 9391066758 - 4087773137 | | 10185 N STELLING RD - FAX QCC
$20.59
000022866920-18 01/12/2025 9391066758 - 4087773143 | | 21975 SAN FERNANDO AV - BBF - Retrea
$21.16
000022866920-19 01/12/2025 9391066758 - 4087773145 | | 21975 SAN FERNANDO AV - BBF-Alarm Go
$20.74
000022866920-20 01/12/2025 9391066758 - 4087773156 | | 21251 STEVENS CREEK BL - SEN- FAX Wo
$20.59
000022866920-21 01/12/2025 9391066758 - 4087773164 | | 21111 STEVENS CREEK BL - Sports Fax
$20.74
000022866920-22 01/12/2025 9391066758 - 4087773168 | | 21111 STEVENS CREEK BL - Sports Cent
$20.74
000022866920-23 01/12/2025 9391066758 - 4087773254 | | 21975 SAN FERNANDO AV - BBF - Golf S
$25.69
000022866920-24 01/12/2025 9391066758 - 4087773258 | | 21975 SAN FERNANDO AV - BBF- Alarm C
$20.59
000022866920-25 01/12/2025 9391066758 - 4087773287 - Comm Hall - Alarm $21.09 000022866920-26 01/12/2025 9391066758 - 4087773288 - Comm Hall - Fire Alarm $21.12 000022866920-27 01/12/2025 9391066758 - 4087773293 - Comm Hall - Fire Alarm $20.59 000022866920-28 01/12/2025 9391066758 - 4087773302 | | 21251 STEVENS CREEK BL - SEN- Credit
$20.59
000022866920-29 01/12/2025 9391066758 - 4087773305 | | 21251 STEVENS CREEK BL - SEN- Credit
$20.59
000022866920-30 01/12/2025 9391066758 - 4087773317 - CH- Finance CC VISA $20.74 000022866920-31 01/12/2025 9391066758 - 4087773333 - CH- FAX downstairs $20.74 000022866920-32 01/12/2025 9391066758 - 4087773365 | | 21251 STEVENS
CREEK BL - RNA FAX
$20.59
000022866920-33 01/12/2025 9391066758 - 4087773369 | | 21251 STEVENS CREEK BL - SEN- Alarm
$21.63
000022866920-34 01/12/2025 9391066758 - 4087773370 | | 21251 STEVENS CREEK BL - SEN- Alarm
$20.81
Tuesday, February 18, 2025Pages: 2 of 30user: Vi Tran 59 CC 03-18-2025
59 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
000022866920-35 01/12/2025 9391066758 - 4087773372 | | 21251 STEVENS CREEK BL - Trane Modem
$20.59
000022866920-36 01/12/2025 9391066758 - 4087773387 | | 10555 MARY AV - FAX or Alarm
$20.59
000022866920-37 01/12/2025 9391066758 - 4087773388 | | 10555 MARY AV - FAX or Alarm
$20.59
000022866920-38 01/12/2025 9391066758 - 4087773399 | | 10555 MARY AV - FAX $20.70 000022866920-39 01/12/2025 9391066758 - 4087773416 | | 21251 STEVENS CREEK BL - SEN- Cr Car
$20.59
000022866920-40 01/12/2025 9391066758 - 4087773419 | | 21251 STEVENS CREEK BL - SEN- Cr Car
$20.59
000022865952-0 01/12/2025 9391023228-McClellan alarm ($21.25) 000022865952-1 01/12/2025 9391023228-4082558166 - Service Center Admin $31.53 000022865952-2 01/12/2025 9391023228-City Hall $2,118.15 000022865952-3 01/12/2025 9391023228-Service Center $129.09 000022865952-4 01/12/2025 9391023228-Wilson Park $31.53 000022865952-5 01/12/2025 9391023228-Street Maintenance $31.53 000022865952-6 01/12/2025 9391023228-Monte Vista - 0720858144 $524.72 000022865952-7 01/12/2025 9391023228-BBF Golf - 0720858146 $427.76 000022865952-8 01/12/2025 9391023228-BBF Park - 0720858145 $427.76 000022865952-9 01/12/2025 9391023228-0720858348 - $427.76 000022865952-10 01/12/2025 9391023228-0720858349 - 10229 North Portal Avenue $427.76 000022865952-11 01/12/2025 9391023228-Teleconnect: BTN0720858350 $427.76 000022865952-12 01/12/2025 9391023228-720858352 $524.72 000022865952-13 01/12/2025 9391023228-Teleconnect: BTN0722762181 $524.72 000022865952-14 01/12/2025 9391023228-4084461114 - 10455 Miller Ave $31.53 000022865952-15 01/12/2025 9391023228-4084461126 - 19784 Wintergreen dr. $31.53 000022865952-16 01/12/2025 9391023228-4084461164 - 10299 N PORTAL AV $31.53 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,981.27
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$66.86
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$104.93
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$3,286.78
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$20.59
736081 02/14/2025 Open Accounts Payable Atium Engineering, Inc. $2,700.00 Invoice Date Description Amount
24DO.78-1 11/30/2024 Peer Review of Photovoltaic Design $2,700.00 Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$2,700.00
736082 02/14/2025 Open Accounts Payable Bay Aerials Gymnastics $1,530.00 Invoice Date Description Amount
02042025 02/04/2025 January 2025 Program Payment $1,530.00 Paying Fund Cash Account Amount
Tuesday, February 18, 2025Pages: 3 of 30user: Vi Tran 60 CC 03-18-2025
60 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$1,530.00
736083 02/14/2025 Open Accounts Payable Bay Area International Translation Services, LLC
$620.00
Invoice Date Description Amount
2025-01001 01/30/2025 GIS- Bay Area Int. Translation Srvcs $620.00 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$620.00
736084 02/14/2025 Open Accounts Payable California Water Services $8,461.86 Invoice Date Description Amount
1188-012425 01/24/2025 5606531188 12/21/24-1/23/25 $112.98 3333-012725 01/27/2025 5926633333 12/19/24-1/21/25 $8,348.88 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$8,461.86
736085 02/14/2025 Open Accounts Payable Chrisp Company $137,221.79 Invoice Date Description Amount
32865R 01/31/2025 De Anza Boulevard Buffered Bike Lane through 01012025-01312025
$137,221.79
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$137,221.79
736086 02/14/2025 Open Accounts Payable CINTAS CORP $2,908.60 Invoice Date Description Amount
4219308438 01/28/2025 Service Center - Uniform Safety Apparel $1,444.95 220042941 02/04/2025 Service Center - Uniform Safety Apparel $1,463.65 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,908.60
736087 02/14/2025 Open Accounts Payable COAST COUNTIES PETERBILT $17.61 Invoice Date Description Amount
01239633P 01/30/2025 Fleet- 2 1/2 Grommet $17.61
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$17.61
736088 02/14/2025 Open Accounts Payable County of Santa Clara -Office of the Sheriff
$90.00
Invoice Date Description Amount
1800092315 01/06/2025 LIVE SCAN SVCS NOV24 $90.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$90.00
736089 02/14/2025 Open Accounts Payable COURT-ORDERED DEBT
COLLECTIONS
$40.25
Invoice Date Description Amount
02072025 02/07/2025 JK-368-7950 ; CD-9252-92888 pp 1/25/25-2/7/25 $40.25 Paying Fund Cash Account Amount
Tuesday, February 18, 2025Pages: 4 of 30user: Vi Tran 61 CC 03-18-2025
61 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$40.25
736090 02/14/2025 Open Accounts Payable EMPLOYMENT DEVELOPMENT
DEPARTMENT
$1,229.00
Invoice Date Description Amount
L1479579344 01/30/2025 Unemployment Insurance Benefit Charge Dec 31 2024 Q4
$1,229.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,229.00
736091 02/14/2025 Open Accounts Payable FEDEX $2.16
Invoice Date Description Amount
9-689-30630 01/24/2025 Service Charge - PW $2.16
Paying Fund Cash Account Amount
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$2.16
736092 02/14/2025 Open Accounts Payable Foster Brothers Security Systems $775.49 Invoice Date Description Amount
8126 02/03/2025 Facilities- Dormitory Lock, Keymark $775.49 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$775.49
736093 02/14/2025 Open Accounts Payable LAUREN SAPUDAR $275.00 Invoice Date Description Amount
LaurenS011425 01/14/2025 Cell Phone Reimbursement for September 2024 to January 2025
$275.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$275.00
736094 02/14/2025 Open Accounts Payable Lester Giles Markarian $202.50 Invoice Date Description Amount
01252025 01/25/2025 Blacksmithing Demonstration 1/25/2025 $202.50 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$202.50
736095 02/14/2025 Open Accounts Payable LIVE OAK ADULT DAY SERVICES $2,161.80 Invoice Date Description Amount
LvOkCDBGQ2FY2425 02/03/2025 Live Oak Q2 Public Service FY24-25 $2,161.80 Paying Fund Cash Account Amount
260 - CDBG 260 100-100 (Cash & Investments Assets Operating Cash)
$2,161.80
736096 02/14/2025 Open Accounts Payable lnternational Institute of Municipal Clerks/IIMC
$160.00
Invoice Date Description Amount
37188-010925 01/09/2025 IIMC Membership for Lauren Sapudar $160.00 Paying Fund Cash Account Amount
Tuesday, February 18, 2025Pages: 5 of 30user: Vi Tran 62 CC 03-18-2025
62 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$160.00
736097 02/14/2025 Open Accounts Payable MAITRI INC $6,503.66 Invoice Date Description Amount
MCDBGQ2FY2425 02/03/2025 General Fund HSG - Q2 $6,503.66 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$6,503.66
736098 02/14/2025 Open Accounts Payable Mountain View Garden Center $370.81 Invoice Date Description Amount
117118 01/30/2025 Street- Top Sand for Sand Bags $370.81 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$370.81
736099 02/14/2025 Open Accounts Payable Operating Engineers Local Union No. 3 $1,486.26
Invoice Date Description Amount
02072025 02/07/2025 Union Dues pp 1/25/25-2/7/25 $1,486.26 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,486.26
736100 02/14/2025 Open Accounts Payable PG&E $28,984.37 Invoice Date Description Amount
1715-012125 01/21/2025 4993063171-5 12/14/24-1/14/25 $28,984.37 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$28,984.37
736101 02/14/2025 Open Accounts Payable PG&E $57,164.08 Invoice Date Description Amount
0092-012725-0 01/27/2025 0116367401 - MILLER W/S NORTH OF
GREENWOOD
$20.57
0092-012725-1 01/27/2025 0116367359 - HOMESTEAD & HERON $81.44 0092-012725-2 01/27/2025 0116367150 - HOMESTEAD & WOLFE RD $133.22 0092-012725-3 01/27/2025 0116367155 - HOMESTEAD & BLANEY $82.48 0092-012725-4 01/27/2025 0116367275 - HOMESTEAD & TANTAU $138.12 0092-012725-5 01/27/2025 0112017763 - 11370 S STELLING RD $9.66 0092-012725-6 01/27/2025 0116644889 - 19500 PRUNERIDGE AVE POLE TP16660
$9.66
0092-012725-7 01/27/2025 0118007511 - 21834 CORTE MADERA LN $5.89 0092-012725-8 01/27/2025 0110161867 - W/S OF WOLFE RD @ APPLE
CAMPUS DRIVEWAY
$93.01
0092-012725-9 01/27/2025 0116367793 - GREENLEAF DR, FLORA VISTA AVE,
GLENCOE DR, N
$827.07
0092-012725-10 01/27/2025 0115145264 - 2018-12 RANDY LANE & LARRY WAY - STREETLIGHTS
$67.92
0092-012725-11 01/27/2025 0111736580 - SPM - SF CUPERTINO 075 $5.82 0092-012725-12 01/27/2025 0116367357 - N DE ANZA BLVD 188 FT $19.37 0092-012725-13 01/27/2025 0116367907 - S/W COR STELLING & $111.04 0092-012725-14 01/27/2025 0116367113 - MILLER E/S 100N OFF $101.49 Tuesday, February 18, 2025Pages: 6 of 30user: Vi Tran 63 CC 03-18-2025
63 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
0092-012725-15 01/27/2025 0116367836 - DE ANZA BLVD E/S S/O $9.91 0092-012725-16 01/27/2025 0116367677 - DE ANZA & LAZANEO $9.86 0092-012725-17 01/27/2025 0116367025 - DE ANZA & LAZANEO DR $110.23 0092-012725-18 01/27/2025 0110659172 - N DE ANZA BLVD 455 FT $14.55 0092-012725-19 01/27/2025 0116367035 - DEANZA BLVD & MARIANI $137.12 0092-012725-20 01/27/2025 0116367045 - DEANZA BLVD @HWY 280 $131.75 0092-012725-21 01/27/2025 0116367050 - NW COR STEVENS CRK $106.03 0092-012725-22 01/27/2025 0116367055 - SAICH WY @ STEVENS CRK NE CORNER
$94.61
0092-012725-23 01/27/2025 0116367060 - E37R0 STEVENS CREEK & $147.63 0092-012725-24 01/27/2025 0116367065 - STEVENS CREEK BLVD E/ $10.64 0092-012725-25 01/27/2025 0116367070 - STEVENS CREEK @ BLANEY AVE $122.79 0092-012725-26 01/27/2025 0116367075 - VALLCO PKWY @ $87.55 0092-012725-27 01/27/2025 0116367090 - WOLFE @ VALLCO PKWY $133.19 0092-012725-28 01/27/2025 0116367100 - E37H3 WOLFE & 280 $139.48 0092-012725-29 01/27/2025 0116367105 - STEVENS CRK & WOLFE RD $187.21 0092-012725-30 01/27/2025 0116367110 - SW COR STEVENS CRK & $114.37 0092-012725-31 01/27/2025 0116367115 - STEVENS CRK @PERIMETER RD $114.86 0092-012725-32 01/27/2025 0116367120 - VALLCO PARKWAY/TANTAU AVE $122.60 0092-012725-33 01/27/2025 0116367125 - STEVENS CRK & TANTAU $124.90 0092-012725-34 01/27/2025 0116367130 - NW COR STEVEN CRK AND $115.47 0092-012725-35 01/27/2025 0116367782 - N/S STEVENS CREEK BLVD $9.86 0092-012725-36 01/27/2025 0116367001 - E37H4 WOLFE & RTE 280 $76.39 0092-012725-37 01/27/2025 0116367165 - S/E WOLFE-PRUNRIDGE $139.11 0092-012725-38 01/27/2025 0116367170 - 10350 N TANTAU AVE / TRAFFIC
PEDESTAL
$118.46
0092-012725-39 01/27/2025 0116367175 - S/E COR PRUNERIDGE & $99.72 0092-012725-40 01/27/2025 0116367180 - FINCH & STEVENS CREEK $131.10 0092-012725-41 01/27/2025 0116367185 - WOLFE RD 500 FT $38.87 0092-012725-42 01/27/2025 0116367195 - CRNR MILLER & PHIL LN $100.91 0092-012725-43 01/27/2025 0116367200 - HOMESTEAD @DEANZA BLVD $150.84 0092-012725-44 01/27/2025 0116367205 - HOMESTEAD RD $96.14 0092-012725-45 01/27/2025 0116367215 - N/RAMP DE ANZA BLVD $119.74 0092-012725-46 01/27/2025 0116367220 - HOMESTEAD RD & BLUE JAY $98.94 0092-012725-47 01/27/2025 0116367225 - WS PORTAL BTW AMHURST- $282.47 0092-012725-48 01/27/2025 0114321565 - 22601 VOSS AVE $873.58 0092-012725-49 01/27/2025 0116367925 - 22601 VOSS AVE $15.86 0092-012725-50 01/27/2025 0116367245 - STEVENS CREEK BLVD & $18.74 0092-012725-51 01/27/2025 0116367269 - COR/LUCILLE & RANDY LN $12.16 0092-012725-52 01/27/2025 0116367255 - LUCILLE & VILLA DE ANZA $388.85 0092-012725-53 01/27/2025 0116367815 - 19784 WINTERGREEN DR $535.38 0092-012725-54 01/27/2025 0116367280 - STEVENS CREEK BLVD & 150 $116.04 0092-012725-55 01/27/2025 0116367290 - STEVENS CRK & MARY AVE 10 $114.32 0092-012725-56 01/27/2025 0116367408 - STEVENS CREEK BL & $83.61 0092-012725-57 01/27/2025 0116367625 - STEVENS CREEK BLVD $9.86 0092-012725-58 01/27/2025 0116367902 - 10246 PARKSIDE LN $328.36 0092-012725-59 01/27/2025 0116367628 - NW COR ALPINE DR & $9.86 0092-012725-60 01/27/2025 0116367476 - SALEM AVE @ FOOTHILL BLVD $9.86 0092-012725-61 01/27/2025 0116367527 - FOOTHILL BLVD 200' N/O $9.86 0092-012725-62 01/27/2025 0116367740 - CARMEN RD @ STEVENS $11.36 Tuesday, February 18, 2025Pages: 7 of 30user: Vi Tran 64 CC 03-18-2025
64 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
0092-012725-63 01/27/2025 0112570652 - FOOTHILL BLVD 150' N/O $22.72 0092-012725-64 01/27/2025 0116367370 - STEVENS CREEK BLVD & $14.79 0092-012725-65 01/27/2025 0116367380 - NE CORNER PENINSULA & 150 $116.34 0092-012725-66 01/27/2025 0116367385 - END/STOKES W/ $12.26 0092-012725-67 01/27/2025 0116367395 - N/E COR FOOTHILL AND $101.93 0092-012725-68 01/27/2025 0116367067 - STONYDALE DR @ $156.41 0092-012725-69 01/27/2025 0116367071 - LINDA VISTA DR $25.17 0092-012725-70 01/27/2025 0116367648 - LINDA VISTA PARK $276.49 0092-012725-71 01/27/2025 0116367455 - E37R9 RODRIGUEZ & $124.70 0092-012725-72 01/27/2025 0116367656 - SCOFIELD & DE ANZA $13.09 0092-012725-73 01/27/2025 0116367465 - DE ANZA BLVD AND $11.88 0092-012725-74 01/27/2025 0116367475 - FOOTHILL AND STEVENS CREEK $110.81 0092-012725-75 01/27/2025 0116367447 - STELLING RD MEDIAN $12.50 0092-012725-76 01/27/2025 0116367236 - STELLING RD MEDIAN $12.75 0092-012725-77 01/27/2025 0116367505 - STEVENS CRK & STELLING $67.77 0092-012725-78 01/27/2025 0116367510 - BUBB RD & RESULTS WY $89.60 0092-012725-79 01/27/2025 0116367515 - BUBB RD & MC CLELLAN $153.02 0092-012725-80 01/27/2025 0116367520 - STELLING RD/PEPPERTREE $91.96 0092-012725-81 01/27/2025 0116367525 - STELLING & MC CLELLAN $131.65 0092-012725-82 01/27/2025 0116367530 - ORANGE AVE & STVNS CRK $77.78 0092-012725-83 01/27/2025 0116367493 - DUMAS DR-JOLLYMAN PARK $395.30 0092-012725-84 01/27/2025 0116367545 - SARATOGA-SUNNYVALE RD @
RAINBOW
$111.95
0092-012725-85 01/27/2025 0116367550 - W/S SARA-SVLE RD AT $99.91 0092-012725-86 01/27/2025 0116367560 - S/E COR DE ANZA & $140.12 0092-012725-87 01/27/2025 0116367570 - DE ANZA BLVD AND $11.88 0092-012725-88 01/27/2025 0116367585 - RAINBOW & STELLING $95.35 0092-012725-89 01/27/2025 0116367559 - 21011 PROSPECT RD $9.86 0092-012725-90 01/27/2025 0116367685 - RUPPELL PL & MOLTZEN DR $72.81 0092-012725-91 01/27/2025 0116367360 - 10300 AINSWORTH DR $9.86 0092-012725-92 01/27/2025 0116367630 - 22100 STEVENS CREEK BLVD $357.33 0092-012725-93 01/27/2025 0116367375 - 10710 STOKES AVE $55.13 0092-012725-94 01/27/2025 0116367044 - 10555 MARY AVE $1,258.95 0092-012725-95 01/27/2025 0116367568 - 10555 MARY AVE $369.34 0092-012725-96 01/27/2025 0116367474 - 10500 ANN ARBOR AVE $18.57 0092-012725-97 01/27/2025 0114315284 - 21975 SAN FERNANDO AVE $2,664.42 0092-012725-98 01/27/2025 0116367171 - 10155 BARBARA LN $19.48 0092-012725-99 01/27/2025 0116367587 - 10430 S DE ANZA BLVD $67.28 0092-012725-100 01/27/2025 0116367449 - 10350 TORRE AVE $3,328.56 0092-012725-101 01/27/2025 0116367145 - 10300 TORRE AVE $8,252.73 0092-012725-102 01/27/2025 0116367437 - 10455 MILLER AVE $694.95 0092-012725-103 01/27/2025 0116367988 - 21710 MCCLELLAN RD $9.86 0092-012725-104 01/27/2025 0116367484 - 20220 SUISUN DR $20.12 0092-012725-105 01/27/2025 0116367763 - 10630 S DE ANZA BLVD $75.91 0092-012725-106 01/27/2025 0116367332 - 821 BUBB RD # B $84.20 0092-012725-107 01/27/2025 0116367274 - 1170 YORKSHIRE DR $9.86 0092-012725-108 01/27/2025 0116367013 - 1486 S STELLING RD $9.86 0092-012725-109 01/27/2025 0116367941 - 7548 DONEGAL DR $12.14 0092-012725-110 01/27/2025 0116367840 - 10185 N STELLING RD $13,105.59 0092-012725-111 01/27/2025 0116367285 - 21111 STEVENS CREEK BLVD $9,521.74 Tuesday, February 18, 2025Pages: 8 of 30user: Vi Tran 65 CC 03-18-2025
65 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
0092-012725-112 01/27/2025 0116367477 - 21121 STEVENS CREEK BLVD $2,456.53 0092-012725-113 01/27/2025 0113736756 - 21251 STEVENS CREEK BLVD $4,009.06 0092-012725-114 01/27/2025 0116367590 - SARATOGA SUNNYVALE RD $94.41 0092-012725-115 01/27/2025 0116367605 - E37C1 PROSPECT & $115.91 0092-012725-116 01/27/2025 0116367610 - E37R6 KENTWOOD $105.11 0092-012725-117 01/27/2025 0116367615 - FALLENLEAF LN & DE ANZA BLVD $115.45 0092-012725-118 01/27/2025 0116367620 - S. DE ANZA BL & SHARON DR $19.17 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$47,285.01
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$357.33
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$9,521.74
736102 02/14/2025 Open Accounts Payable PG&E $115.27
Invoice Date Description Amount
4212-012425 01/24/2025 3535370421-2 12/19/24-1/17/25 $115.27 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$115.27
736103 02/14/2025 Open Accounts Payable PG&E $26,159.84 Invoice Date Description Amount
3296-012825 01/28/2025 5116972329-6 12/21/24-1/21/25 $26,159.84 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$26,159.84
736104 02/14/2025 Open Accounts Payable PG&E $318.44
Invoice Date Description Amount
0349-012425 01/24/2025 3042033034-9 12/18/24-1/16/25 $318.44 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$318.44
736105 02/14/2025 Open Accounts Payable PG&E $230.27
Invoice Date Description Amount
8413-012725 01/27/2025 4685859841-3 12/20/24-1/20/25 $230.27 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$230.27
736106 02/14/2025 Open Accounts Payable PG&E $384.78
Invoice Date Description Amount
5875-011825 01/18/2025 2012160587-5 12/19/24-1/17/25 $384.78 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$384.78
736107 02/14/2025 Open Accounts Payable PG&E $212.58
Invoice Date Description Amount
9785-012725 01/27/2025 2016881978-5 12/19/24-1/17/25 $212.58 Paying Fund Cash Account Amount
Tuesday, February 18, 2025Pages: 9 of 30user: Vi Tran 66 CC 03-18-2025
66 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$212.58
736108 02/14/2025 Open Accounts Payable PG&E $984.14
Invoice Date Description Amount
6480-012925 01/29/2025 5587684648-0 12/23/24-1/22/25 $984.14 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$984.14
736109 02/14/2025 Open Accounts Payable PG&E $27,312.17 Invoice Date Description Amount
3296-122724 12/27/2024 5116972329-6 11/20/24-12/20/24 $27,312.17 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$27,312.17
736110 02/14/2025 Open Accounts Payable PLEASANTON TRUCKING, INC. $4,770.40 Invoice Date Description Amount
114870163 01/22/2025 Grounds- In-Field Mix & Environmental Fee $1,936.42 114870367 02/03/2025 Grounds- In-Field Mix & Environmental Fee $2,833.98 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,770.40
736111 02/14/2025 Open Accounts Payable Quadient Leasing USA, Inc. $165.85 Invoice Date Description Amount
Q1685012 01/15/2025 Lease Payment for 11/16/24-02/15/25 $165.85 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$165.85
736112 02/14/2025 Open Accounts Payable REBECCA MCCORMICK $351.00 Invoice Date Description Amount
02042025 02/04/2025 January 2025 Program Payment $351.00 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$351.00
736113 02/14/2025 Open Accounts Payable RPM EXTERMINATORS INC $1,275.00 Invoice Date Description Amount
0114214 01/30/2025 Facilities- Bait Trap Service $1,275.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,020.00
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$255.00
736114 02/14/2025 Open Accounts Payable San Jose Water Company $4,427.80 Invoice Date Description Amount
SJW010325-0 01/03/2025 0067500000-4 - Oro Grande PL LS $208.48 SJW010325-1 01/03/2025 0879200000-5 - Stelling Rd. LS $665.14 SJW010325-2 01/03/2025 1731610000-1 - De Anza Blvd.S. $694.87 SJW010325-3 01/03/2025 4242600000-8 - Irrigation-Median (Bollinger Rd) $205.37 SJW010325-4 01/03/2025 4862898282-8 - 10455 Torre Ave $386.82 Tuesday, February 18, 2025Pages: 10 of 30user: Vi Tran 67 CC 03-18-2025
67 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
SJW010325-5 01/03/2025 5280181221-6 - S De Anza Bl (median irrigation) $208.48 SJW010325-6 01/03/2025 5461910000-8 - De Anza Blvd.S. $650.29 SJW010325-7 01/03/2025 5949902723-9 - Creekline Dr $413.81 SJW010325-8 01/03/2025 9705420000-7 - 10300 Torre Avenue Ls $994.54 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,427.80
736115 02/14/2025 Open Accounts Payable San Jose Water Company $53,023.17 Invoice Date Description Amount
12312024 01/28/2025 Water System Upgrades $53,023.17
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$53,023.17
736116 02/14/2025 Open Accounts Payable Sharp Electronics Corporation $350.59 Invoice Date Description Amount
9005200529 02/05/2025 Sharp Maintenance Agreement for MFP support 2/1/25 - 2/28/25
$350.59
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$350.59
736117 02/14/2025 Open Accounts Payable The State Bar of California $1,356.00 Invoice Date Description Amount
I_1F3A1A32_10714 02/06/2025 2025 State Bar Dues, CDJ 235108 and MKTW 158281 $1,356.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,356.00
736118 02/14/2025 Open Accounts Payable Bajwa, Satwinder Singh $1,000.00 Invoice Date Description Amount
273823 02/04/2025 1174 Scotland Dr. Encroachment, 273823 $1,000.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,000.00
736119 02/14/2025 Open Accounts Payable Dryco Construction, Inc $12,000.00 Invoice Date Description Amount
347770 01/31/2025 10503 N Tantau, Encroachment, 347770 $12,000.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$12,000.00
736120 02/14/2025 Open Accounts Payable Jounghwa Cho $35.00 Invoice Date Description Amount
Jounghwa1162025 01/16/2025 Live Scan and Fingerprinting Reimbursement $35.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$35.00
736121 02/14/2025 Open Accounts Payable KLEIN, MARIA $200.00 Invoice Date Description Amount
2005247.012 02/10/2025 SPORTS CENTER REFUNDABLE PARTY DEPOSIT( 02/10/2025)
$200.00
Tuesday, February 18, 2025Pages: 11 of 30user: Vi Tran 68 CC 03-18-2025
68 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$200.00
736122 02/14/2025 Open Accounts Payable Larry Farnsley $15.00 Invoice Date Description Amount
2002711.032 01/31/2025 Rhythmaires Band Refund Schedule Conflict $15.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$15.00
736123 02/14/2025 Open Accounts Payable LI, KEN $36.00
Invoice Date Description Amount
2005191.012 12/10/2024 SPORTS CENTER (12/10/2024) CCT. CREDIT REFUND
$36.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$36.00
736124 02/14/2025 Open Accounts Payable NISHTALA, RAVIKIRAN $92.50 Invoice Date Description Amount
2005225.012 01/03/2025 SPORTS CENTER (01/03/2025)) ACCT. CREDIT REFUND
$92.50
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$92.50
736125 02/14/2025 Open Accounts Payable PASSARELLO, JANICE $45.00 Invoice Date Description Amount
2005233.012 01/27/2025 SPORTS CENTER (01/27/2025) ACCT. CREDIT REFUND
$45.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$45.00
736126 02/14/2025 Open Accounts Payable PUBLIC STORAGE $10,000.00 Invoice Date Description Amount
353951 02/05/2025 REFUND 20565 VALLEY GREEN DRIVE TCO BOND $10,000.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$10,000.00
736127 02/14/2025 Open Accounts Payable RAGHVENDRA, SRINIVAS $100.00 Invoice Date Description Amount
2005232.012 01/27/2025 SPORTS CENTER (01/27/2025) ACCT CREDIT REFUND
$100.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$100.00
736128 02/14/2025 Open Accounts Payable RAJAGOPAL , NAGALAKSHMI $45.14 Invoice Date Description Amount
2005245.012 02/06/2025 SPORTS CENTER (02/06/2025) ACCT. CREDIT REFUND
$45.14
Paying Fund Cash Account Amount
Tuesday, February 18, 2025Pages: 12 of 30user: Vi Tran 69 CC 03-18-2025
69 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$45.14
736129 02/14/2025 Open Accounts Payable RAJESH, NAMRITA $112.50 Invoice Date Description Amount
2005241.012 02/06/2025 SPORTS CENTER (02/06/2025) ACCT. CREDIT REFUND
$112.50
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$112.50
736130 02/14/2025 Open Accounts Payable RAMA, DEEPAK $28.00 Invoice Date Description Amount
2005246.012 02/06/2025 SPORTS CENTER (02/06/2025) ACCT. CREDIT REFUND
$28.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$28.00
736131 02/14/2025 Open Accounts Payable RAMAKRISHNAN, ASHWIN $33.60 Invoice Date Description Amount
2005239.012 02/06/2025 SPORTS CENTER (02/06/2025) ACCT. CREDIT REFUND
$33.60
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$33.60
736132 02/14/2025 Open Accounts Payable RAMARAJAR, NIRANJAN $75.00 Invoice Date Description Amount
2005244.012 02/06/2025 SPORTS CENTER (02/06/2025) ACCT. CREDIT REFUND
$75.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$75.00
736133 02/14/2025 Open Accounts Payable RAMESH, LALITHA $12.00 Invoice Date Description Amount
2005240.012 02/06/2025 SPORTS CENTER (02/06/2025) ACCT. CREDIT REFUND
$12.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$12.00
736134 02/14/2025 Open Accounts Payable RANADE, PRAJAKTA $60.00 Invoice Date Description Amount
2005237.012 02/06/2025 SPORTS CENTER 02/06/2025) ACCT. CREDIT REFUND
$60.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$60.00
736135 02/14/2025 Open Accounts Payable RAO, PADAKANDLA KRISHNA $37.50 Invoice Date Description Amount
2005243.012 02/06/2025 SPORTS CENTER (02/06/2025) ACCT. CREDIT REFUND
$37.50
Tuesday, February 18, 2025Pages: 13 of 30user: Vi Tran 70 CC 03-18-2025
70 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$37.50
736136 02/14/2025 Open Accounts Payable REWARI, RADHICA $28.00 Invoice Date Description Amount
2005242.012 02/06/2025 SPORTS CENTER (02/06/2025) ACCT. CREDIT REFUND
$28.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$28.00
736137 02/14/2025 Open Accounts Payable Rockridge Geotechnical $1,000.00 Invoice Date Description Amount
346515 02/04/2025 10309 Mary Ave., Encroachment, 346515 $1,000.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,000.00
736138 02/14/2025 Open Accounts Payable Sandra Lee $5.00 Invoice Date Description Amount
2002709.032 01/30/2025 Photo Offloading Workshop Activity Withdraw Schedule Conflict
$5.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$5.00
736139 02/14/2025 Open Accounts Payable Subramanian, Swarna $5,000.00 Invoice Date Description Amount
277682 01/28/2025 21650 Rainbow Ct, Encroachment, 277682 $5,000.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$5,000.00
736140 02/14/2025 Open Accounts Payable Tyagamohan , Gottipati $10,000.00 Invoice Date Description Amount
331181 01/28/2025 10320 Wunderlich Dr. Encroachment; 331181 $10,000.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$10,000.00
736141 02/14/2025 Open Accounts Payable Uma Marthala $500.00 Invoice Date Description Amount
2002671.032 12/23/2024 12.22.24 R205052 Community Hall Rental Deposit Refund
$500.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$500.00
736142 02/14/2025 Open Accounts Payable Wafu Ikebana Society $500.00 Invoice Date Description Amount
2002707.032 01/30/2025 January 25, 2025 R198432 CH Rental Deposit Refund $500.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$500.00
Tuesday, February 18, 2025Pages: 14 of 30user: Vi Tran 71 CC 03-18-2025
71 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
736143 02/14/2025 Open Accounts Payable Santa Clara County Emergency Managers Association
$92.55
Invoice Date Description Amount
240351.1 12/16/2024 SCC EMA Membership 2025 $92.55
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$92.55
Type Check Totals: 68 Transactions $433,268.42
EFT
41671 02/03/2025 Open Accounts Payable EMPLOYMENT DEVEL DEPT $44,489.89 Invoice Date Description Amount
01242025 01/24/2025 CA State Tax pp 1/11/25-1/24/25 $44,489.89 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$44,489.89
41672 02/03/2025 Open Accounts Payable IRS $140,668.04
Invoice Date Description Amount
01242025 01/24/2025 Federal Tax pp 1/11/25-1/24/25 $140,668.04 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$140,668.04
41673 02/06/2025 Open Accounts Payable P E R S $167,983.79 Invoice Date Description Amount
01242025 01/24/2025 PERS pp 1/11/25-1/24/25 $167,983.79 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$167,983.79
41674 02/06/2025 Open Accounts Payable California Public Employees' Retirement System
$487,532.44
Invoice Date Description Amount
7158-011425 01/14/2025 Health Premiums $487,532.44
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$342,760.89
642 - Retiree Medical 642 100-100 (Cash & Investments Assets Operating Cash)
$144,771.55
41675 02/03/2025 Open Accounts Payable SQUARE, INC. $70.00 Invoice Date Description Amount
SQUARE020125 02/01/2025 SQUARE Team Plus 2/1/25-3/1/25 $70.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$70.00
41676 02/07/2025 Open Accounts Payable USPS - EFT ONLY $350.00 Invoice Date Description Amount
562584932 02/06/2025 Shipping - permit fees $350.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$350.00
Tuesday, February 18, 2025Pages: 15 of 30user: Vi Tran 72 CC 03-18-2025
72 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41677 02/10/2025 Open Accounts Payable USPS - EFT ONLY $719.77 Invoice Date Description Amount
562586701 02/06/2025 Shipping - USPS Marketing Mail $719.77 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$719.77
41678 02/14/2025 Open Accounts Payable Colonial Life & Accident Insurance $29.16 Invoice Date Description Amount
02072025 02/07/2025 Colonial Products pp 1/25/25-2/7/25 $29.16 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$29.16
41679 02/14/2025 Open Accounts Payable Employment Development $11,208.05 Invoice Date Description Amount
02072025 02/07/2025 State Disability Insurance pp 1/25/25-2/7/25 $11,208.05 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$11,208.05
41680 02/14/2025 Open Accounts Payable National Deferred (ROTH) $3,410.00 Invoice Date Description Amount
02072025 02/07/2025 Nationwide Roth pp 1/25/25-2/7/25 $3,410.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,410.00
41681 02/14/2025 Open Accounts Payable National Deferred Compensation $21,744.42 Invoice Date Description Amount
02072025 02/07/2025 Nationwide Deferred Compensation pp 1/25/25-2/7/25 $21,744.42 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$21,744.42
41682 02/14/2025 Open Accounts Payable PERS-457K $14,151.98 Invoice Date Description Amount
02072025 02/07/2025 PERS 457K pp 1/25/25-2/7/25 $14,151.98 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$14,151.98
41683 02/14/2025 Open Accounts Payable State Disbursement Unit $603.49 Invoice Date Description Amount
02072025 02/07/2025 Child Support pp 1/25/25-2/7/25 $603.49 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$603.49
41684 02/14/2025 Open Accounts Payable 4LEAF, Inc. $21,960.31 Invoice Date Description Amount
J4259G 12/31/2024 Jollyman All Inclusive Park through 12012024- 12312024
$21,960.31
Paying Fund Cash Account Amount
Tuesday, February 18, 2025Pages: 16 of 30user: Vi Tran 73 CC 03-18-2025
73 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$21,960.31
41685 02/14/2025 Open Accounts Payable ABAG POWER- ASSOCIATION OF
BAY AREA GOVERNMENTS
$5,205.05
Invoice Date Description Amount
AR037690 02/01/2025 FY 25 AMD Level Charge-Nat Gas $5,205.05 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,685.36
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$519.69
41686 02/14/2025 Open Accounts Payable AIRGAS USA LLC $110.49 Invoice Date Description Amount
5514260574 01/31/2025 Fleet- Acetylene & Oxygen Cylinder Rental $110.49 Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$110.49
41687 02/14/2025 Open Accounts Payable Aldo Corral $110.00 Invoice Date Description Amount
AldoC012525 01/25/2025 Cell Phone Reimbursement - Aldo C 12.26.24 to
01.25.25 $55.00
AldoC122524 12/25/2024 Cell Phone Reimbursement - Aldo C 11.26.24 to
12.25.24 $55.00
Paying Fund Cash Account Amount
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$110.00
41688 02/14/2025 Open Accounts Payable All City Management Services, Inc. $20,394.22 Invoice Date Description Amount
98450 01/22/2025 School Crossing Guard Services through 01052025- 01182025
$20,394.22
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$20,394.22
41689 02/14/2025 Open Accounts Payable Alliant Insurance Services, Inc. $105.00 Invoice Date Description Amount
2967646 01/27/2025 Insurance Premium for Ginger Tsun Instruction 2025 $105.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$105.00
41690 02/14/2025 Open Accounts Payable Amazon Capital Services $10,620.83 Invoice Date Description Amount
1RNG-67NL-RJ64 02/01/2025 Amazon Purchases Jan 2025 - PR3 Sports and Fitness
$49.10
1H1X-P49G-K3VN 02/01/2025 Amazon Purchases Jan 2025 - PR1 Admin $30.15 11G4-4NLM-MH13 02/01/2025 PW Env. Ursula: Logitech Wireless Mouse for New Onboarding
$32.36
16LF-NF4H-MNTR 02/01/2025 I&T Department orders for period 1/1/25 to 1/31/25 $2,388.97 1QXJ-GDH6-PT7J 02/01/2025 Service Center - Multiple Division Purchases Jan 2025 $4,782.72 Tuesday, February 18, 2025Pages: 17 of 30user: Vi Tran 74 CC 03-18-2025
74 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
1VQ1-MFQ3-JMK6 02/01/2025 Amazon Business - February 2025 $38.21 1MN7-1R99-DJQ4 02/04/2025 PW City Hall: Batteries and Power Adapter $79.66 19JJ-9HWV-LF4F 02/01/2025 Amazon Purchases Jan 2025 - PR2 Senior Wellness $594.95 1YWF-4P6T-WFW6 01/11/2025 Apply credit memo related to invoice 1MPW-4MFV- F4TL
($22.80)
1F4J-3NMV-KTN7 01/13/2025 Apply credit memo related to invoice 1P7X-J499-DV13 ($32.08) 11JD-DVN9-K4V3 01/13/2025 Apply credit memo related to invoice 1P7X-J499-DV13 ($32.08) 1QDQ-41XJ-RNJH 02/01/2025 Amazon Purchases Jan 2025 - PR5 Outdoor Recreation
$232.79
1F3P-1M9T-M46M 02/01/2025 Amazon Purchases Jan 2025 - PR4 Events, Facilities, Youth, Teen
$2,371.44
13MK-PVQ1-DTQR 01/28/2025 Apply credit memo related to invoice 1KGG-L6Q9- D7F3
($13.08)
1M14-9W46-P6TN 02/01/2025 Office Supplies - ASD $120.52 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$6,956.56
230 - Env Mgmt Cln Crk Strm Drain 230 100-100 (Cash & Investments Assets Operating Cash)
$32.36
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$66.84
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$1,303.48
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$259.22
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$1,686.00
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$316.37
41691 02/14/2025 Open Accounts Payable Amazon Web Services, Inc. $1,653.31 Invoice Date Description Amount
2028473813 02/01/2025 AWS Applications January 1 - January 31, 2025 $1,653.31 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,653.31
41692 02/14/2025 Open Accounts Payable American Assured Security, Inc. $654.50 Invoice Date Description Amount
50087 02/03/2025 Rental Security Services $654.50
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$654.50
41693 02/14/2025 Open Accounts Payable Anderson's Tree Care Specialists, Inc. $3,033.00 Invoice Date Description Amount
19604 01/14/2025 Grounds- Fruit Tree Treatment $2,495.00 19603 01/14/2025 Grounds- Fruit Tree Treatment $538.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,033.00
Tuesday, February 18, 2025Pages: 18 of 30user: Vi Tran 75 CC 03-18-2025
75 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41694 02/14/2025 Open Accounts Payable Avocette Technologies Inc. $1,908.08 Invoice Date Description Amount
2501CU1 01/31/2025 FY25 Accela Support - ServicePlus++ Support January 2025
$1,908.08
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,908.08
41695 02/14/2025 Open Accounts Payable Azteca Systems, LLC $53,941.23 Invoice Date Description Amount
INV9567 12/23/2024 Cityworks Azteca Syst LLC- Enterp License Agr 12/31/24-12/30/25
$53,941.23
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$53,941.23
41696 02/14/2025 Open Accounts Payable B&H PHOTO-VIDEO $2,297.15 Invoice Date Description Amount
231275767 01/28/2025 Video Division Hardware spllies for iPad, Camera, & lens
$2,297.15
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,297.15
41697 02/14/2025 Open Accounts Payable Baker Tilly Advisory Group, LP $38,925.00 Invoice Date Description Amount
BT3045091 01/28/2025 Budget Doc and Perf Measures Improvement Activity 4 -9
$38,925.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$38,925.00
41698 02/14/2025 Open Accounts Payable Baseline Environmental Consulting $2,042.50 Invoice Date Description Amount
23308.04-001 12/10/2024 Mary Ave. Phase 1 ESA Peer Review - 2024/11 $2,042.50 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,042.50
41699 02/14/2025 Open Accounts Payable Batteries Plus Bulbs #475 $144.33 Invoice Date Description Amount
P79864101 01/27/2025 Facilities- 12V Lead Batteries $144.33 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$144.33
41700 02/14/2025 Open Accounts Payable Bay Area News Group $1,558.00 Invoice Date Description Amount
0001435315 01/31/2025 Legal Advertising - 1/1/2025-1/31/25 $1,558.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,558.00
Tuesday, February 18, 2025Pages: 19 of 30user: Vi Tran 76 CC 03-18-2025
76 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41701 02/14/2025 Open Accounts Payable Bikeep Inc. $49.00 Invoice Date Description Amount
18235 01/31/2025 Monthly Bikeep Fee $49.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$49.00
41702 02/14/2025 Open Accounts Payable BOSCO OIL INC DBA VALLEY OIL $1,986.02 Invoice Date Description Amount
657901 01/28/2025 Fleet- Shell Rotella, Recycling Fee, Motor Oil, Drum Deposits
$1,986.02
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$1,986.02
41703 02/14/2025 Open Accounts Payable Broadcast Pix Inc. $4,513.32 Invoice Date Description Amount
174096 02/07/2025 GX 11 2000 Support extended warranty 4/1/25 - 3/31/26
$4,513.32
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,513.32
41704 02/14/2025 Open Accounts Payable CHAD MOSLEY $110.00 Invoice Date Description Amount
ChadM12202024 12/20/2024 Cell Phone Reimbursement through 11212024- 12202024
$55.00
ChadM01202025 01/20/2025 Cell Phone Reimbursement through 12212024- 01202025
$55.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$110.00
41705 02/14/2025 Open Accounts Payable CLEARBLU ENVIRONMENTAL $450.92 Invoice Date Description Amount
32834 01/27/2025 Street- January 2025 Preventative Maint. $450.92 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$450.92
41706 02/14/2025 Open Accounts Payable CoreLogic Solutions, LLC. $106.09 Invoice Date Description Amount
30758171 01/31/2025 FY25 RealQuest 2 Package Property Detail Rpt 1/1/25 -1/31/25
$106.09
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$106.09
41707 02/14/2025 Open Accounts Payable Cupertino Chamber of Commerce $4,650.00 Invoice Date Description Amount
11262024 11/26/2024 Cupertino Chamber of Commerce October 2024 Invoice
$1,500.00
012725 01/27/2025 Cupertino Chamber of Commerce November 2024 Invoice
$2,050.00
Tuesday, February 18, 2025Pages: 20 of 30user: Vi Tran 77 CC 03-18-2025
77 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
01312025 01/31/2025 Cupertino Chamber of Commerce December 2024 Invoice
$1,100.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,650.00
41708 02/14/2025 Open Accounts Payable Cupertino Supply, Inc $386.29 Invoice Date Description Amount
373656 01/16/2025 Facilities- Brass Spud $24.05
375391 02/05/2025 Grounds- PVC Primer, PVC Glue, Tape, Pipe Dope, Rector Seal..
$198.77
375392 02/05/2025 Grounds- Cobra Water Pump Plier Set $163.47 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$386.29
41709 02/14/2025 Open Accounts Payable DAN BARONE $55.00 Invoice Date Description Amount
DanB011825 01/18/2025 Cell Phone Reimbursement - Dan B 121924 to 011825 $55.00 Paying Fund Cash Account Amount
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$55.00
41710 02/14/2025 Open Accounts Payable Dell Marketing L.P. $23,932.30 Invoice Date Description Amount
10797671556 02/03/2025 16x OptiPlex Micro, 16x Small Form, 16x Mem,16x Micro form Stand
$17,310.86
10798130895 02/05/2025 2x Dell Mobile Precision Workstation 5690 $6,621.44 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$23,932.30
41711 02/14/2025 Open Accounts Payable Doggie Walk Bags, Inc. $2,182.60 Invoice Date Description Amount
0116524-IN 01/29/2025 Grounds- Unscented Disposable Bags $2,182.60 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,182.60
41712 02/14/2025 Open Accounts Payable Dormatech Mechanical Systems, Inc. $6,584.64 Invoice Date Description Amount
13914 01/15/2025 Facilities- Troubleshoot Aermec Chiller $1,030.00 13983 01/30/2025 Facilities- EEC Radiant Floor Repair & Replacement $5,554.64 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$6,584.64
41713 02/14/2025 Open Accounts Payable Duran Construction Group $251,950.57 Invoice Date Description Amount
0125-3 01/18/2025 2024 Concrete Reconstruction Project $251,950.57 Paying Fund Cash Account Amount
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$251,950.57
Tuesday, February 18, 2025Pages: 21 of 30user: Vi Tran 78 CC 03-18-2025
78 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41714 02/14/2025 Open Accounts Payable East Bay Tire Co. $754.32 Invoice Date Description Amount
2109418 01/22/2025 Fleet- DPT Trailer Dawg Tires $754.32 Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$754.32
41715 02/14/2025 Open Accounts Payable Eflex Group, Inc $4,477.85 Invoice Date Description Amount
02072025 02/07/2025 FSA pp 1/25/25-2/7/25 $4,477.85
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,477.85
41716 02/14/2025 Open Accounts Payable G. Bortolotto & Company, Inc. $1,320,530.28 Invoice Date Description Amount
5209 02/03/2025 2024 Pavement Maintenance Ph. 1 through 010125- 013125
$1,320,530.28
Paying Fund Cash Account Amount
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$1,320,530.28
41717 02/14/2025 Open Accounts Payable GARDENLAND POWER
EQUIPMENT
$186.14
Invoice Date Description Amount
1151136 01/31/2025 Trees/ROW- Carbide Chain Loops $186.14 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$186.14
41718 02/14/2025 Open Accounts Payable Geotab USA, Inc $2,349.00 Invoice Date Description Amount
IN417029 01/31/2025 Geotab for Telematics January 2025 $2,349.00 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$2,349.00
41719 02/14/2025 Open Accounts Payable GRAINGER INC $160.76 Invoice Date Description Amount
9391150266 01/30/2025 Street- Lithium Batteries, Coin Cell Batteries $53.90 9386289756 01/27/2025 Facilities- Weatherproof Speaker $106.86 Paying Fund Cash Account Amount
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$53.90
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$106.86
41720 02/14/2025 Open Accounts Payable HdL Coren & Cone $5,225.80 Invoice Date Description Amount
SIN046865 01/28/2025 Contract Services Property Tax: JAN-MAR25 $5,225.80 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$5,225.80
Tuesday, February 18, 2025Pages: 22 of 30user: Vi Tran 79 CC 03-18-2025
79 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41721 02/14/2025 Open Accounts Payable Holmes US $7,575.00 Invoice Date Description Amount
0054247 10/27/2024 Senior Center Fire Alarm through 09262024-10272024 $5,677.50 0054423 11/24/2024 Senior Center Fire Alarm through 10282024-11242024 $1,897.50 Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$7,575.00
41722 02/14/2025 Open Accounts Payable IFPTE LOCAL 21 $1,973.47 Invoice Date Description Amount
02072025 02/07/2025 Association Dues - CEA pp 1/25/25-2/7/25 $1,973.47 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,973.47
41723 02/14/2025 Open Accounts Payable Independent Code Consultants, Inc. $19,012.65 Invoice Date Description Amount
2075 02/03/2025 Building Plan Review Services - 2025/1 $12,607.65 2076 02/03/2025 Building Permit Tech Services - 2025/1 $6,405.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$19,012.65
41724 02/14/2025 Open Accounts Payable Iron Mountain $3,128.03 Invoice Date Description Amount
KCKK632 01/31/2025 Storage Period - 2/01/2025 - 2/28/2025 $3,128.03 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,128.03
41725 02/14/2025 Open Accounts Payable JINDY GARFIAS $55.00 Invoice Date Description Amount
JindyG01112025 01/11/2025 Cell Phone Reimbursement through 01112025 $55.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$55.00
41726 02/14/2025 Open Accounts Payable KEVIN RIEDEN $55.00 Invoice Date Description Amount
KevinR01282025 01/28/2025 Cell Phone Reimbursement through 122924-012825 $55.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$55.00
41727 02/14/2025 Open Accounts Payable Law Office of Clare M. Gibson $498.00 Invoice Date Description Amount
1321 02/01/2025 Legal Services, January 2025 $498.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$498.00
41728 02/14/2025 Open Accounts Payable Liang Chao $37.39 Invoice Date Description Amount
LCHAO012825 01/28/2025 Holder’s Country Inn – Mayor Chao Coffee and Chat Reimbursement
$37.39
Tuesday, February 18, 2025Pages: 23 of 30user: Vi Tran 80 CC 03-18-2025
80 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$37.39
41729 02/14/2025 Open Accounts Payable Metal Building Company $45,853.00 Invoice Date Description Amount
5779-2 01/27/2025 Service Center Emergency Materials Bunker Repair $45,853.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$45,853.00
41730 02/14/2025 Open Accounts Payable Min Zhao $81.00
Invoice Date Description Amount
ZHAO020425 02/04/2025 Reimbursement for CPA Reinstatement $81.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$81.00
41731 02/14/2025 Open Accounts Payable MissionSquare 300292 $19,907.53 Invoice Date Description Amount
02072025 02/07/2025 ICMA pp 1/25/25-2/7/25 $19,907.53
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$19,907.53
41732 02/14/2025 Open Accounts Payable Moss Adams LLP $1,850.00 Invoice Date Description Amount
102692252 01/24/2025 Professional Services DEC 24 $1,850.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,850.00
41733 02/14/2025 Open Accounts Payable Ninyo Moore $8,715.50 Invoice Date Description Amount
296466 12/11/2024 Geotechnical Observation & Testing through November 9, 2024
$4,650.00
297779 01/10/2025 Geotechnical Observation & Testing through December 30, 2024
$4,065.50
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$8,715.50
41734 02/14/2025 Open Accounts Payable OmniData $66,856.00 Invoice Date Description Amount
K9669 12/31/2024 Data Warehouse Srvcs, Build & Deploy, PM, Architect, & Data Eng
$24,522.00
K9720 01/31/2025 Data Warehouse Srvcs, Build & Deploy, PM, Architect, & Data Eng.
$42,334.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$66,856.00
41735 02/14/2025 Open Accounts Payable PARS/City of Cupertino $3,845.49 Invoice Date Description Amount
02072025 02/07/2025 PARS pp 1/25/25-2/7/25 $3,845.49
Tuesday, February 18, 2025Pages: 24 of 30user: Vi Tran 81 CC 03-18-2025
81 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,845.49
41736 02/14/2025 Open Accounts Payable PayPal Inc. $105.20 Invoice Date Description Amount
PPGW154910665 01/31/2025 VSV0001160385 cupertinoweb2 01-Jan-25 to 31-Jan- 25 $85.25
PPGW154722079 01/31/2025 VSV0003096477 cupertinoweb4 01-Jan-25 to 31-Jan- 25 $19.95
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$105.20
41737 02/14/2025 Open Accounts Payable PDQ.COM CORPORATION $2,008.12 Invoice Date Description Amount
PDQ-39166 01/27/2025 SmartDeploy Essential Support Subscription 03/24/2025-03/24/2026
$2,008.12
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$2,008.12
41738 02/14/2025 Open Accounts Payable Phoenix MSA Holdings, LLC $1,650.69 Invoice Date Description Amount
INV-PHX1A0244 02/03/2025 FY25 Colocation Services March 2025 $1,650.69 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$1,650.69
41739 02/14/2025 Open Accounts Payable PRN Intermediate Holdco, Inc. $800.00 Invoice Date Description Amount
02052543418 02/05/2025 Proactive Evaluation SERENA TU $200.00 11072460900 11/07/2024 Proactive Evaluation - J.Nguyen M.Drown S.Locurto $600.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$800.00
41740 02/14/2025 Open Accounts Payable Qless, Inc. $7,317.50 Invoice Date Description Amount
INV-14638 02/03/2025 Qless API Access Annual Subscription 1/16/2025 to 2/28/2026
$562.50
INV-14650 02/03/2025 Qless Mobile Queuing Subscription 3/1/2025 to 2/28/2026
$6,755.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$7,317.50
41741 02/14/2025 Open Accounts Payable Quadient Finance USA, Inc. $1,000.00 Invoice Date Description Amount
8702-020325 02/03/2025 Postage funds for machine - Feb 2025 $1,000.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,000.00
Tuesday, February 18, 2025Pages: 25 of 30user: Vi Tran 82 CC 03-18-2025
82 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41742 02/14/2025 Open Accounts Payable Quadient, Inc. $142.04 Invoice Date Description Amount
61688994 01/24/2025 Standard Maintenance for Postage Machine (02/23/25 -05/22/25)
$142.04
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$142.04
41743 02/14/2025 Open Accounts Payable Quartic Solutions $1,495.00 Invoice Date Description Amount
4263 01/28/2025 FY25 Quartic for GIS Support December 2024 $1,495.00 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$1,495.00
41744 02/14/2025 Open Accounts Payable R. Thomas Heck & Associates $20,126.00 Invoice Date Description Amount
116 02/03/2025 Cupertino Parks & Recreation Spring Brochure 2025 $20,126.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$20,126.00
41745 02/14/2025 Open Accounts Payable Raychel Renee Balcioni Cruz $6,360.00 Invoice Date Description Amount
021425 RRBC 02/10/2025 February fitness classes and personal training $6,360.00 Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$6,360.00
41746 02/14/2025 Open Accounts Payable Rebuilding Together Silicon Valley $12,367.06 Invoice Date Description Amount
RTSVCDBGQ2FY2425 02/03/2025 CDBG Capital Housing Projects - Q2 FY2425 $12,367.06 Paying Fund Cash Account Amount
260 - CDBG 260 100-100 (Cash & Investments Assets Operating Cash)
$12,367.06
41747 02/14/2025 Open Accounts Payable Rise Housing Solutions, Inc $15,276.00 Invoice Date Description Amount
Cupertino - 045 01/31/2025 BMR Program Administrator 2025/1 $15,276.00 Paying Fund Cash Account Amount
265 - BMR Housing 265 100-100 (Cash & Investments Assets Operating Cash)
$15,276.00
41748 02/14/2025 Open Accounts Payable SCA of CA, LLC $70,581.42 Invoice Date Description Amount
2025-000958 01/31/2025 November 2024 True up amount $17,172.21 2025-000957 01/31/2025 December 2024 True Up $17,172.21 2025-000956 01/31/2025 Street Sweeping January 2025 $36,237.00 Paying Fund Cash Account Amount
230 - Env Mgmt Cln Crk Strm Drain 230 100-100 (Cash & Investments Assets Operating Cash)
$35,290.70
520 - Resource Recovery 520 100-100 (Cash & Investments Assets Operating Cash)
$35,290.72
Tuesday, February 18, 2025Pages: 26 of 30user: Vi Tran 83 CC 03-18-2025
83 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41749 02/14/2025 Open Accounts Payable Sedgwick Claims Management Services, Inc.
$2,401.92
Invoice Date Description Amount
400000227402 02/01/2025 Worker's Compensation Claims FEB25 $2,401.92 Paying Fund Cash Account Amount
620 - Workers' Compensation 620 100-100 (Cash & Investments Assets Operating Cash)
$2,401.92
41750 02/14/2025 Open Accounts Payable Shute, Mihaly & Weinberger LLP $1.70 Invoice Date Description Amount
289709 01/29/2025 Legal Services, December 2024 $1.70
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1.70
41751 02/14/2025 Open Accounts Payable Software One, Inc $106,157.99 Invoice Date Description Amount
US-PSI-1540186 01/31/2025 FY25 Microsoft Enterprise Software Licensing 1/1/25 - 12/31/25
$106,157.99
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$106,157.99
41752 02/14/2025 Open Accounts Payable Sonitrol/Pacific West Security, Inc. $18,523.00 Invoice Date Description Amount
93227 01/23/2025 Facilities- QCC Lobby Office Security Door Upgrade $18,443.00 93228 01/23/2025 Facilities- QCC Security Services Jan-Mar 2025 $80.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$18,523.00
41753 02/14/2025 Open Accounts Payable Staples $175.75
Invoice Date Description Amount
6021152311 01/07/2025 Binders and tabs for Commissioner binders $115.74 6021410687 01/11/2025 Date Stamp for Clerk's Office $60.01 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$175.75
41754 02/14/2025 Open Accounts Payable Starbird Consulting LLC $8,184.55 Invoice Date Description Amount
0259 01/14/2025 Regnart Road Improvements through December 30, 2024
$2,009.21
0258 12/29/2024 Regnart Road Improvements through November 30, 2024
$6,175.34
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$8,184.55
41755 02/14/2025 Open Accounts Payable SUNNYVALE FORD, INC. $567.48 Invoice Date Description Amount
251678FOW 01/28/2025 Fleet- HV Hose $32.33
250352FOW 01/02/2025 Fleet- HV Louvre $48.15
250533FOW 01/07/2025 Fleet- PR Glass $351.13
Tuesday, February 18, 2025Pages: 27 of 30user: Vi Tran 84 CC 03-18-2025
84 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
250640FOW 01/07/2025 Fleet- HV Cable $94.14
251297FOW 01/21/2025 Fleet- HV Valve $41.73
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$567.48
41756 02/14/2025 Open Accounts Payable SVA Architects, Inc. $2,250.00 Invoice Date Description Amount
62900 11/30/2024 Sports Center Rocker Rooms through 11302024 $2,250.00 Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$2,250.00
41757 02/14/2025 Open Accounts Payable Tanko Lighting $3,348.00 Invoice Date Description Amount
69912 11/30/2024 LED Streetlight Transition through November 2024 $3,348.00 Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$3,348.00
41758 02/14/2025 Open Accounts Payable TERI GERHARDT $249.93 Invoice Date Description Amount
TeriG12172024 12/17/2024 Teri Cell Reimbursement 4086008144 May 17- December 17, 2024
$249.93
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$249.93
41759 02/14/2025 Open Accounts Payable Thomson Reuters - West $874.43 Invoice Date Description Amount
851422549 02/01/2025 Online Subscription, January 2025 - Acct 1000489718 $874.43 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$874.43
41760 02/14/2025 Open Accounts Payable United Site Services $93.90 Invoice Date Description Amount
114-14007669 01/28/2025 portable toilet at compost site Jan-Feb 2025 $93.90 Paying Fund Cash Account Amount
520 - Resource Recovery 520 100-100 (Cash & Investments Assets Operating Cash)
$93.90
41761 02/14/2025 Open Accounts Payable West Coast Code Consultants, Inc. $35,891.81 Invoice Date Description Amount
224-012-156-01 01/15/2025 Building Plan Review Services - 2024/12 $35,891.81 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$35,891.81
41762 02/14/2025 Open Accounts Payable West Valley Community Services $4,885.69 Invoice Date Description Amount
WVCSCAREQ2FY2425 02/03/2025 CDBG Public Services - Q2 (CARE) $4,885.69 Paying Fund Cash Account Amount
260 - CDBG 260 100-100 (Cash & Investments Assets Operating Cash)
$4,885.69
Tuesday, February 18, 2025Pages: 28 of 30user: Vi Tran 85 CC 03-18-2025
85 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41763 02/14/2025 Open Accounts Payable Zayo Group, LLC $3,262.50 Invoice Date Description Amount
2025020030583 02/01/2025 FY25 Disaster Recovery Telecom srvcs February 2025 $3,262.50 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$3,262.50
41764 02/12/2025 Open Accounts Payable TASC $409.86
Invoice Date Description Amount
IN3365493 02/11/2025 HRA - Administration Fees FEB25 $409.86 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$409.86
41765 02/12/2025 Open Accounts Payable TASC $296.77
Invoice Date Description Amount
IN3365496 02/18/2025 FSA - Administration Fees FEB25 $296.77 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$296.77
Type EFT Totals: 95 Transactions $3,194,512.30
Main Account - Main Checking Account Totals
Checks Status Count Transaction Amount Reconciled Amount Open 68 $433,268.42 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 68 $433,268.42 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 95 $3,194,512.30 $0.00
Reconciled 0 $0.00 $0.00
Tuesday, February 18, 2025Pages: 29 of 30user: Vi Tran 86 CC 03-18-2025
86 of 541
Payment Register
City of Cupertino
From Payment Date: 2/1/2025 - To Payment Date: 2/14/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Voided 0 $0.00 $0.00
Total 95 $3,194,512.30 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 163 $3,627,780.72 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 163 $3,627,780.72 $0.00
Grand Totals:
Checks Status Count Transaction Amount Reconciled Amount Open 68 $433,268.42 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 68 $433,268.42 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 95 $3,194,512.30 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 95 $3,194,512.30 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 163 $3,627,780.72 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 163 $3,627,780.72 $0.00
Tuesday, February 18, 2025Pages: 30 of 30user: Vi Tran
87 CC 03-18-2025
87 of 541
RESOLUTION NO. 25-XXX
A RESOLUTION OF THE CUPERTINO CITY COUNCIL
RATIFYING CERTAIN CLAIMS AND DEMANDS PAYABLE IN THE
AMOUNTS AND FROM THE FUNDS AS HEREINAFTER DESCRIBED FOR
GENERAL AND MISCELLANEOUS EXPENDITURES FOR THE PERIOD
ENDING FEBRUARY 28, 2025
WHEREAS, the Director of Administrative Services or their designated representative has certified to accuracy of the following claims and demands and to the availability of funds for payment hereof; and
WHEREAS, the said claims and demands have been audited as required by law.
NOW, THEREFORE, BE IT RESOLVED that the City Council does hereby ratify the following claims and demands in the amounts and from the funds as hereinafter set forth in the attached Payment Register.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Cupertino this 18
th day of March, 2025 by the following vote:
Vote Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
SIGNED:
________
Liang Chao, Mayor
City of Cupertino
________________________
Date
ATTEST:
________
Kirsten Squarcia, City Clerk
________________________
Date
88 CC 03-18-2025
88 of 541
Resolution No. 25-XXX
CERTIFICATION
The Finance Manager hereby certifies to the accuracy of said records and to the availability of funds for payment.
CERTIFIED:
Jonathan Orozco, Finance Manager
89 CC 03-18-2025
89 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Main Account - Main Checking Account
Check
736144 02/28/2025 Open Accounts Payable Advantage Grafix $300.09 Invoice Date Description Amount
49262 02/11/2025 PW City Hall: SR2S Bike Skills Poster Sign $300.09 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$300.09
736145 02/28/2025 Open Accounts Payable ALHAMBRA $316.50 Invoice Date Description Amount
4984902 021525 02/15/2025 Employee Drinking Water - Sports Center $66.77 14628570 022025 02/20/2025 Employee Drinking Water for BBF - Currently Balance Only
$249.73
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$316.50
736146 02/28/2025 Open Accounts Payable ALHAMBRA $176.36 Invoice Date Description Amount
21589707 021325 02/13/2025 Employee Drinking Water for Service Center $176.36 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$176.36
736147 02/28/2025 Open Accounts Payable AM Signal, LLC $590.14 Invoice Date Description Amount
M29770 12/23/2024 PW Transportation: Axis T8640 Ethernet over Coax Adapter
$590.14
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$590.14
736148 02/28/2025 Open Accounts Payable AT & T $115.67
Invoice Date Description Amount
5558-012825 01/28/2025 960 731-7142 555 8 $115.67
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$115.67
736149 02/28/2025 Open Accounts Payable AT&T $9,311.04
Invoice Date Description Amount
000023005198 02/10/2025 9391051384 1/10/25-2/9/25 $1,622.39 000023013855 02/12/2025 9391023221 (408-253-9200) 1/12/25-2/11/25 $67.54 000023013857 02/12/2025 9391023223 1/12/25-2/11/25 $93.73 000023013951 02/12/2025 9391023218 (238-371-7141) 1/12/25-2/11/25 $64.10 000023013952 02/12/2025 9391023217 (237-361-8095) 1/12/25-2/11/25 $81.36 000023013953 02/12/2025 9391023216 (233-281-5494) 1/12/25-2/11/25 $65.68 000023013954 02/12/2025 9391023215 (233-281-4421) 1/12/25-2/11/25 $83.37 000023013854-0 02/12/2025 9391023228-McClellan alarm $201.66 000023013854-1 02/12/2025 9391023228-4082558166 - Service Center Admin $31.76 000023013854-2 02/12/2025 9391023228-City Hall $2,119.73 000023013854-3 02/12/2025 9391023228-Service Center $128.76 000023013854-4 02/12/2025 9391023228-Wilson Park $31.76 Tuesday, March 4, 2025Pages: 1 of 30user: Vi Tran 90
CC 03-18-2025
90 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
000023013854-5 02/12/2025 9391023228-Street Maintenance $31.88 000023013854-6 02/12/2025 9391023228-Monte Vista - 0720858144 $524.72 000023013854-7 02/12/2025 9391023228-BBF Golf - 0720858146 $427.76 000023013854-8 02/12/2025 9391023228-BBF Park - 0720858145 $427.76 000023013854-9 02/12/2025 9391023228-0720858348 - $427.76 000023013854-10 02/12/2025 9391023228-0720858349 - 10229 North Portal Avenue $427.76 000023013854-11 02/12/2025 9391023228-Teleconnect: BTN0720858350 $427.76 000023013854-12 02/12/2025 9391023228-720858352 $524.72 000023013854-13 02/12/2025 9391023228-Teleconnect: BTN0722762181 $524.72 000023013854-14 02/12/2025 9391023228-4084461114 - 10455 Miller Ave $31.76 000023013854-15 02/12/2025 9391023228-4084461126 - 19784 Wintergreen dr. $31.76 000023013854-16 02/12/2025 9391023228-4084461164 - 10299 N PORTAL AV $31.76 000023014822-0 02/12/2025 9391066758 - 4087771305 | | 10185 N STELLING RD - Secure FAX
$20.65
000023014822-1 02/12/2025 9391066758 - 4087771306 | | 10185 N STELLING RD - Sheriff
$20.61
000023014822-2 02/12/2025 9391066758 - 4087771307 | | 10185 N STELLING RD - Sheriff
$20.61
000023014822-3 02/12/2025 9391066758 - 4087771311 | | 22221 MC CLELLAN RD - Environmental
$25.68
000023014822-4 02/12/2025 9391066758 - 4087771318 | | 10555 MARY AV - Traffic Operating Ce
$36.61
000023014822-5 02/12/2025 9391066758 - 4087771331 | | 21975 SAN FERNANDO AV - BBF- Kiosk A
$21.14
000023014822-6 02/12/2025 9391066758 - 4087771340 | | 10555 MARY AV - Alarm- Service Cente
$20.75
000023014822-7 02/12/2025 9391066758 - 4087771344 | | 21251 STEVENS
CREEK BL - SEN - FAX
$20.61
000023014822-8 02/12/2025 9391066758 - 4087771345 - CH- PG&E Meter $20.76 000023014822-9 02/12/2025 9391066758 - 4087771346 | | 21111 STEVENS CREEK BL - SPORTS Cent
$20.76
000023014822-10 02/12/2025 9391066758 - 4087771348 | | 10555 MARY AV - Alarm- Service Cente
$21.98
000023014822-11 02/12/2025 9391066758 - 4087771355 | | 10555 MARY AV - Mechanic Shop FAX
$20.61
000023014822-12 02/12/2025 9391066758 - 4087773102 | | 10185 N STELLING RD - Museum/Spare
$20.61
000023014822-13 02/12/2025 9391066758 - 4087773103 | | 10185 N STELLING RD - Museum/Spare
$20.61
000023014822-14 02/12/2025 9391066758 - 4087773109 - FAX $20.61 000023014822-15 02/12/2025 9391066758 - 4087773112 | | 21111 STEVENS CREEK BL - SPORTS- Fir
$21.91
000023014822-16 02/12/2025 9391066758 - 4087773113 | | 21111 STEVENS CREEK BL - SPORTS- Fir
$20.89
000023014822-17 02/12/2025 9391066758 - 4087773137 | | 10185 N STELLING RD - FAX QCC
$20.61
000023014822-18 02/12/2025 9391066758 - 4087773143 | | 21975 SAN FERNANDO AV - BBF - Retrea
$21.48
000023014822-19 02/12/2025 9391066758 - 4087773145 | | 21975 SAN FERNANDO AV - BBF-Alarm Go
$20.76
Tuesday, March 4, 2025Pages: 2 of 30user: Vi Tran 91
CC 03-18-2025
91 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
000023014822-20 02/12/2025 9391066758 - 4087773156 | | 21251 STEVENS CREEK BL - SEN- FAX Wo
$20.61
000023014822-21 02/12/2025 9391066758 - 4087773164 | | 21111 STEVENS CREEK BL - Sports Fax
$20.76
000023014822-22 02/12/2025 9391066758 - 4087773168 | | 21111 STEVENS CREEK BL - Sports Cent
$20.76
000023014822-23 02/12/2025 9391066758 - 4087773254 | | 21975 SAN FERNANDO AV - BBF - Golf S
$25.68
000023014822-24 02/12/2025 9391066758 - 4087773258 | | 21975 SAN FERNANDO AV - BBF- Alarm C
$20.61
000023014822-25 02/12/2025 9391066758 - 4087773287 - Comm Hall - Alarm $20.96 000023014822-26 02/12/2025 9391066758 - 4087773288 - Comm Hall - Fire Alarm $21.13 000023014822-27 02/12/2025 9391066758 - 4087773293 - Comm Hall - Fire Alarm $20.61 000023014822-28 02/12/2025 9391066758 - 4087773302 | | 21251 STEVENS CREEK BL - SEN- Credit
$20.61
000023014822-29 02/12/2025 9391066758 - 4087773305 | | 21251 STEVENS CREEK BL - SEN- Credit
$20.61
000023014822-30 02/12/2025 9391066758 - 4087773317 - CH- Finance CC VISA $20.76 000023014822-31 02/12/2025 9391066758 - 4087773333 - CH- FAX downstairs $20.76 000023014822-32 02/12/2025 9391066758 - 4087773365 | | 21251 STEVENS
CREEK BL - RNA FAX
$20.61
000023014822-33 02/12/2025 9391066758 - 4087773369 | | 21251 STEVENS CREEK BL - SEN- Alarm
$21.66
000023014822-34 02/12/2025 9391066758 - 4087773370 | | 21251 STEVENS CREEK BL - SEN- Alarm
$20.84
000023014822-35 02/12/2025 9391066758 - 4087773372 | | 21251 STEVENS CREEK BL - Trane Modem
$20.61
000023014822-36 02/12/2025 9391066758 - 4087773387 | | 10555 MARY AV - FAX or Alarm
$20.61
000023014822-37 02/12/2025 9391066758 - 4087773388 | | 10555 MARY AV - FAX or Alarm
$20.61
000023014822-38 02/12/2025 9391066758 - 4087773399 | | 10555 MARY AV - FAX $20.81 000023014822-39 02/12/2025 9391066758 - 4087773416 | | 21251 STEVENS CREEK BL - SEN- Cr Car
$20.61
000023014822-40 02/12/2025 9391066758 - 4087773419 | | 21251 STEVENS CREEK BL - SEN- Cr Car
$20.61
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$5,768.85
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$67.54
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$166.99
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$3,287.05
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$20.61
736150 02/28/2025 Open Accounts Payable Atium Engineering, Inc. $700.00 Invoice Date Description Amount
24DO.78-2 01/31/2025 Peer Review of Photovoltaic Design $700.00 Paying Fund Cash Account Amount
Tuesday, March 4, 2025Pages: 3 of 30user: Vi Tran 92
CC 03-18-2025
92 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$700.00
736151 02/28/2025 Open Accounts Payable CALED $800.00
Invoice Date Description Amount
300005986 02/18/2025 Daniel Degu 2025 Membership for CALED $800.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$800.00
736152 02/28/2025 Open Accounts Payable California Building Officials $425.00 Invoice Date Description Amount
18414 02/04/2025 CALBO Membership and Webinar Training $425.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$425.00
736153 02/28/2025 Open Accounts Payable Catholic Charities of Santa Clara County
$2,447.82
Invoice Date Description Amount
CCOCDBGQ2FY2425 02/20/2025 Long Term Care Ombudsman FY24-25 10/01/24 - 12/31/24
$2,447.82
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,447.82
736154 02/28/2025 Open Accounts Payable CINTAS CORP $2,917.36 Invoice Date Description Amount
4220713335 02/11/2025 Service Center - Uniform Safety Apparel $1,519.06 4221478969 02/18/2025 Service Center - Uniform Safety Apparel $1,398.30 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,917.36
736155 02/28/2025 Open Accounts Payable County of Santa Clara $4,447.10 Invoice Date Description Amount
1800092754 01/31/2025 FY24-25 Aerial Imagery & LiDAR Data Acqui Cost Share FY25
$4,447.10
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$4,447.10
736156 02/28/2025 Open Accounts Payable County of Santa Clara -Office of the Sheriff
$1,491,517.83
Invoice Date Description Amount
1800092777 02/04/2025 Advanced for the Law Enforcement Svs (Feb 2025) $1,491,517.83 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,491,517.83
736157 02/28/2025 Open Accounts Payable Data Ticket, Inc. $25.00 Invoice Date Description Amount
175543 02/17/2025 Online access to citation processing-January 2025 $25.00 Paying Fund Cash Account Amount
Tuesday, March 4, 2025Pages: 4 of 30user: Vi Tran 93
CC 03-18-2025
93 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
230 - Env Mgmt Cln Crk Strm Drain 230 100-100 (Cash & Investments Assets Operating Cash)
$25.00
736158 02/28/2025 Open Accounts Payable HUICHEN LIN $468.00 Invoice Date Description Amount
022825 HL 02/19/2025 February fitness classes $468.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$468.00
736159 02/28/2025 Open Accounts Payable Insight Public Sector, Inc. $18,926.89 Invoice Date Description Amount
1101245907 02/07/2025 FY25 Insight NextRequest renewal 12/19/24 - 12/18/25
$18,926.89
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$18,926.89
736160 02/28/2025 Open Accounts Payable M T Tire Service $5,514.21 Invoice Date Description Amount
33784 01/09/2025 Fleet- VEHICLE #6 - Tires $1,246.40
33782 01/09/2025 Fleet- VEHICLE #430 - Tires $1,366.40 33783 01/09/2025 Fleet- VEHICLE #466 - Tires $2,901.41
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$5,514.21
736161 02/28/2025 Open Accounts Payable Mood Media $43.14 Invoice Date Description Amount
58707152 02/01/2025 MOOD MEDIA Recurring Services from 01-FEB-25 to 28-FEB-25
$43.14
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$43.14
736162 02/28/2025 Open Accounts Payable Napa Auto Parts $582.11 Invoice Date Description Amount
741687 02/06/2025 Fleet- Air Filters $228.25
741995 02/12/2025 Fleet- Air Filters $171.46
742074 02/12/2025 Fleet- TPMS Valve $182.40
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$582.11
736163 02/28/2025 Open Accounts Payable Northern California Recycling Association
$840.00
Invoice Date Description Amount
1485 02/14/2025 NCRA 2025 Conference- Reg & Membership for 4 staff $840.00 Paying Fund Cash Account Amount
520 - Resource Recovery 520 100-100 (Cash & Investments Assets Operating Cash)
$840.00
Tuesday, March 4, 2025Pages: 5 of 30user: Vi Tran 94
CC 03-18-2025
94 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
736164 02/28/2025 Open Accounts Payable Occupational Health Centers of California, A Medi
$37.00
Invoice Date Description Amount
85167255 01/30/2025 TB Test w/ Chest X-Ray $37.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$37.00
736165 02/28/2025 Open Accounts Payable Operating Engineers Local Union No. 3 $1,486.26
Invoice Date Description Amount
02212025 02/21/2025 Union Dues pp 2/8/25-2/21/25 $1,486.26 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,486.26
736166 02/28/2025 Open Accounts Payable PROJECT SENTINEL $11,842.25 Invoice Date Description Amount
440-502-123124 02/19/2025 Fair Housing & Tenant Landlord Counseling Q2 10/01/24-12/31/24
$11,842.25
Paying Fund Cash Account Amount
265 - BMR Housing 265 100-100 (Cash & Investments Assets Operating Cash)
$11,842.25
736167 02/28/2025 Open Accounts Payable Raj Goel $351.00 Invoice Date Description Amount
022825 RJ 02/19/2025 February fitness classes $351.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$351.00
736168 02/28/2025 Open Accounts Payable Ricardo Alvarez $58.00 Invoice Date Description Amount
RA021025 02/10/2025 Commercial Driver License Renewal Reimbursement $58.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$58.00
736169 02/28/2025 Open Accounts Payable Royal Coach Tours $2,505.00 Invoice Date Description Amount
31545 02/06/2025 Charter 32906: 2/6/25 - Steinbeck House and Center $1,390.00 33254 02/19/2025 Charter 33254: 2/19/25 - House of Prime Rib Trip $1,115.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,505.00
736170 02/28/2025 Open Accounts Payable San Jose Water Company $42,220.70 Invoice Date Description Amount
SJW012825-0 01/28/2025 0068410000-1 - 22221 McClellan 8302 $3,245.80 SJW012825-1 01/28/2025 0134100000-6 - 8303 Memorial Park $793.36 SJW012825-2 01/28/2025 0345710000-0 - Alderbrook Ln.FS $168.09 SJW012825-3 01/28/2025 0677310000-0 - 10300 Torre Ave LS (Comm.Hall) $424.32 SJW012825-4 01/28/2025 1250520000-1 - 6620 Blackberry/Snack $2,090.87 SJW012825-5 01/28/2025 1332100000-5 - Hyde Avenue $1,140.14 Tuesday, March 4, 2025Pages: 6 of 30user: Vi Tran 95
CC 03-18-2025
95 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
SJW012825-6 01/28/2025 1444810000-9 - Hyannisport Dr. LS $844.37 SJW012825-7 01/28/2025 1735700000-3 - 8303 Memorial Park Restroom $486.82 SJW012825-8 01/28/2025 1787904559-3 - 22221 McClellan 8302 $257.04 SJW012825-9 01/28/2025 1832500000-0 - Ruppell PL LS $417.18 SJW012825-10 01/28/2025 1836700000-9 - 8322 Mary Mini Park $387.02 SJW012825-11 01/28/2025 1987700000-0 - Alderbrook Ln LS $2,154.31 SJW012825-12 01/28/2025 2228610000-7 - 21111 Stevens Crk LS $415.52 SJW012825-13 01/28/2025 2243500000-9 - 10300 Ainsworth Dr.LS $1,035.76 SJW012825-14 01/28/2025 2286120000-8 - 21251 Stevens Creek Blvd $106.25 SJW012825-15 01/28/2025 2288800000-1 - Stokes Ave/8306 Somerset Park $387.02 SJW012825-16 01/28/2025 2649300000-9 - 10300 Torre Ave. FS (Comm.Hall) $168.09 SJW012825-17 01/28/2025 2787197813-9 - 8322 Stevens Creek Bl $122.57 SJW012825-18 01/28/2025 2892070144-9 - 22221 McClellan 8320 $212.50 SJW012825-19 01/28/2025 2958510000-0 - 10555 Mary Ave. $146.12 SJW012825-20 01/28/2025 2984810000-3 - 8504 Alves and Stelling $458.30 SJW012825-21 01/28/2025 3207400000-4 - 21710 McClellan 8312 $387.02 SJW012825-22 01/28/2025 3322910000-4 - 8306 Somerset Park(Stokes Ave) $387.02 SJW012825-23 01/28/2025 3530520000-4 - 21111 Stev.Crk Blvd 8510 $622.27 SJW012825-24 01/28/2025 3612707315-7 - Stocklmeir Ct $461.25 SJW012825-25 01/28/2025 3673220000-5 - Stev.Crk/Cupertino Rd. $122.57 SJW012825-26 01/28/2025 3746710000-6 - 21111 Stev.Crk BL FS $166.96 SJW012825-27 01/28/2025 3841010000-2 - 8507 Monta Vista Park $429.77 SJW012825-28 01/28/2025 3856110000-9 - 8322 Stella Estates $122.57 SJW012825-29 01/28/2025 3857710000-1 - 8322 Foothill/Cupertino Rd $242.79 SJW012825-30 01/28/2025 3900520000-9 - 10300 Torre Ave $894.47 SJW012825-31 01/28/2025 3953083125-2 - Tuscany Pl $839.61 SJW012825-32 01/28/2025 4103020000-4 - 6620 Blackberry/Snack $7,038.52 SJW012825-33 01/28/2025 4227520000-6 - 8303 Memorial Park $394.14 SJW012825-34 01/28/2025 4444250747-9 - Tuscany Pl $802.01 SJW012825-35 01/28/2025 5237400000-9 - Dumas Dr, LS $2,382.44 SJW012825-36 01/28/2025 5356310000-6 - 8322 Stev.Crk/Median $387.02 SJW012825-37 01/28/2025 5778910000-5 - 8504 Quinlan Ln.FS $106.25 SJW012825-38 01/28/2025 5835000000-4 - 8322 Stelling/Alves $250.55 SJW012825-39 01/28/2025 5929210000-1 - 8322 Ann Arbor Ct $242.79 SJW012825-40 01/28/2025 5986710000-6 - 10300 Torre Ave. FS (Comm.Hall) $794.25 SJW012825-41 01/28/2025 5997110000-9 - 7555 Barnhart Pl $1,316.22 SJW012825-42 01/28/2025 6292600000-1 - 10800 Torre Ave LS $837.20 SJW012825-43 01/28/2025 6296810000-8 - 8322 Stev.Crk Bl median $122.57 SJW012825-44 01/28/2025 6405210000-1 - 8506 McClellan Ranch $301.33 SJW012825-45 01/28/2025 6578520000-0 - 83 Foothill Bl/Alpine Dr22 LS $242.79 SJW012825-46 01/28/2025 6788620000-4 - 10555 Mary Ave. 8503 $422.65 SJW012825-47 01/28/2025 6935200000-9 - 8303 Memorial Park $814.76 SJW012825-48 01/28/2025 6973320000-5 - 8301 Linda Vista PK1 $436.91 SJW012825-49 01/28/2025 7036000000-7 - 85 Stev.Crk/Mary LS $242.79 SJW012825-50 01/28/2025 7054200000-8 - 8322 Phar Lap LS $74.49 SJW012825-51 01/28/2025 7495200000-3 - 10300 Torre Ave FS $168.09 SJW012825-52 01/28/2025 7630410000-1 - Salem Av.LS $242.79 SJW012825-53 01/28/2025 7930000000-1 - 8322 Stelling/Christensen Dr. $242.79 SJW012825-54 01/28/2025 8006810000-9 - 10450 Mann Dr $74.49 SJW012825-55 01/28/2025 8065700000-8 - Peninsula and Fitzgerald Is $76.87 Tuesday, March 4, 2025Pages: 7 of 30user: Vi Tran 96
CC 03-18-2025
96 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
SJW012825-56 01/28/2025 8270010000-9 - Janice Ave.LS $387.02 SJW012825-57 01/28/2025 8287220000-9 - 8322 Stevens Cr/San Antonio Ls $122.57 SJW012825-58 01/28/2025 8427420000-9 - 8322 Foothill/Vista Knoll $242.79 SJW012825-59 01/28/2025 8647520000-1 - 10555 Mary Ave/Corp Yard FS $273.22 SJW012825-60 01/28/2025 8755010000-9 - 10455 Miller Ave/Creekside $756.67 SJW012825-61 01/28/2025 8879620000-9 - 8504 Christensen Dr $429.77 SJW012825-62 01/28/2025 8886800000-6 - 8301 Linda Vista PK2 $387.02 SJW012825-63 01/28/2025 9377600000-7 - 8307 Varian Park $387.02 SJW012825-64 01/28/2025 9824500000-9 - 8322 Irrig SC/Stelling $335.46 SJW012825-65 01/28/2025 9988206980-2 (old 6784967491-5) - 8303 Memorial Park
$746.70
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$41,015.95
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$1,204.75
736171 02/28/2025 Open Accounts Payable San Jose Water Company $15,769.90 Invoice Date Description Amount
SJW092424-0 09/24/2024 1250520000-1 - 6620 Blackberry/Snack $14,282.65 SJW102224-0MISC 10/22/2024 4103020000-4 - 6620 Blackberry/Snack $782.97 SJW013025-0 01/30/2025 5122900000-8 - Portable Meter - Trees & ROW $704.28 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$15,769.90
736172 02/28/2025 Open Accounts Payable San Jose Water Company $730.07 Invoice Date Description Amount
7329-01302025 01/30/2025 0645365732-9 Streets Division 12.28.24 to 01.27.25 $730.07 Paying Fund Cash Account Amount
230 - Env Mgmt Cln Crk Strm Drain 230 100-100 (Cash & Investments Assets Operating Cash)
$730.07
736173 02/28/2025 Open Accounts Payable San Jose Water Company $64,634.42 Invoice Date Description Amount
SJW102224-MISC1 10/22/2024 0068410000-1 - 22221 McClellan 8302 $3,240.35 SJW102224-MISC2 10/22/2024 0134100000-6 - 8303 Memorial Park $4,612.93 SJW102224-MISC3 10/22/2024 0345710000-0 - Alderbrook Ln.FS $162.57 SJW102224-MISC4 10/22/2024 1444810000-9 - Hyannisport Dr. LS $5,149.27 SJW102224-MISC5 10/22/2024 1735700000-3 - 8303 Memorial Park Restroom $406.62 SJW102224-MISC6 10/22/2024 1787904559-3 - 22221 McClellan 8302 $278.68 SJW102224-MISC7 10/22/2024 1832500000-0 - Ruppell PL LS $4,001.30 SJW102224-MISC8 10/22/2024 1836700000-9 - 8322 Mary Mini Park $303.31 SJW102224-MISC9 10/22/2024 1987700000-0 - Alderbrook Ln LS $9,897.79 SJW102224-MISC10 10/22/2024 2228610000-7 - 21111 Stevens Crk LS $707.33 SJW102224-MISC11 10/22/2024 2243500000-9 - 10300 Ainsworth Dr.LS $3,601.94 SJW102224-MISC12 10/22/2024 2286120000-8 - 21251 Stevens Creek Blvd $102.74 SJW102224-MISC13 10/22/2024 2288800000-1 - Stokes Ave/8306 Somerset Park $1,063.39 SJW102224-MISC14 10/22/2024 2787197813-9 - 8322 Stevens Creek Bl $103.16 SJW102224-MISC15 10/22/2024 2984810000-3 - 8504 Alves and Stelling $399.24 SJW102224-MISC16 10/22/2024 3322910000-4 - 8306 Somerset Park(Stokes Ave) $303.31 SJW102224-MISC17 10/22/2024 3612707315-7 - Stocklmeir Ct $205.47 Tuesday, March 4, 2025Pages: 8 of 30user: Vi Tran 97
CC 03-18-2025
97 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
SJW102224-MISC18 10/22/2024 3673220000-5 - Stev.Crk/Cupertino Rd. $95.79 SJW102224-MISC19 10/22/2024 3746710000-6 - 21111 Stev.Crk BL FS $161.44 SJW102224-MISC20 10/22/2024 3841010000-2 - 8507 Monta Vista Park $1,949.22 SJW102224-MISC21 10/22/2024 3856110000-9 - 8322 Stella Estates $95.79 SJW102224-MISC22 10/22/2024 3857710000-1 - 8322 Foothill/Cupertino Rd $581.24 SJW102224-MISC23 10/22/2024 3900520000-9 - 10300 Torre Ave $768.15 SJW102224-MISC24 10/22/2024 4227520000-6 - 8303 Memorial Park $937.94 SJW102224-MISC25 10/22/2024 5356310000-6 - 8322 Stev.Crk/Median $303.31 SJW102224-MISC26 10/22/2024 5778910000-5 - 8504 Quinlan Ln.FS $102.74 SJW102224-MISC27 10/22/2024 5835000000-4 - 8322 Stelling/Alves $190.13 SJW102224-MISC28 10/22/2024 5929210000-1 - 8322 Ann Arbor Ct $197.50 SJW102224-MISC29 10/22/2024 6292600000-1 - 10800 Torre Ave LS $4,558.05 SJW102224-MISC30 10/22/2024 6296810000-8 - 8322 Stev.Crk Bl median $95.79 SJW102224-MISC31 10/22/2024 6405210000-1 - 8506 McClellan Ranch $242.18 SJW102224-MISC32 10/22/2024 6578520000-0 - 83 Foothill Bl/Alpine Dr22 LS $190.13 SJW102224-MISC33 10/22/2024 6788620000-4 - 10555 Mary Ave. 8503 $362.34 SJW102224-MISC34 10/22/2024 6935200000-9 - 8303 Memorial Park $7,756.60 SJW102224-MISC35 10/22/2024 6973320000-5 - 8301 Linda Vista PK1 $952.70 SJW102224-MISC36 10/22/2024 7036000000-7 - 85 Stev.Crk/Mary LS $204.88 SJW102224-MISC37 10/22/2024 7054200000-8 - 8322 Phar Lap LS $39.30 SJW102224-MISC38 10/22/2024 7630410000-1 - Salem Av.LS $219.64 SJW102224-MISC39 10/22/2024 7930000000-1 - 8322 Stelling/Christensen Dr. $197.50 SJW102224-MISC40 10/22/2024 8006810000-9 - 10450 Mann Dr $58.02 SJW102224-MISC41 10/22/2024 8065700000-8 - Peninsula and Fitzgerald Is $72.77 SJW102224-MISC42 10/22/2024 8270010000-9 - Janice Ave.LS $325.44 SJW102224-MISC43 10/22/2024 8287220000-9 - 8322 Stevens Cr/San Antonio Ls $110.54 SJW102224-MISC44 10/22/2024 8647520000-1 - 10555 Mary Ave/Corp Yard FS $264.18 SJW102224-MISC45 10/22/2024 8879620000-9 - 8504 Christensen Dr $377.10 SJW102224-MISC46 10/22/2024 8886800000-6 - 8301 Linda Vista PK2 $923.18 SJW102224-MISC47 10/22/2024 9377600000-7 - 8307 Varian Park $3,063.24 SJW102224-MISC48 10/22/2024 9824500000-9 - 8322 Irrig SC/Stelling $426.27 SJW102224-MISC49 10/22/2024 9988206980-2 (old 6784967491-5) - 8303 Memorial Park
$4,271.92
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$63,765.65
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$868.77
736174 02/28/2025 Open Accounts Payable Senior Adults Legal Assistance (SALA)
$3,951.36
Invoice Date Description Amount
SALACDBGQ2FY2425 02/10/2025 FY24-25 General Fund HSG - Q2 $3,951.36 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,951.36
736175 02/28/2025 Open Accounts Payable TownTalk $625.25 Invoice Date Description Amount
527235 01/22/2025 Golf Course hats for sale $625.25
Paying Fund Cash Account Amount
Tuesday, March 4, 2025Pages: 9 of 30user: Vi Tran 98
CC 03-18-2025
98 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$625.25
736176 02/28/2025 Open Accounts Payable Tracer Golf Accessories $401.63 Invoice Date Description Amount
013936 01/22/2025 Golf Tees and accessories $401.63
Paying Fund Cash Account Amount
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$401.63
736177 02/28/2025 Open Accounts Payable TUCKER CONSTRUCTION INC $13,181.90 Invoice Date Description Amount
33827 12/20/2024 Lawrence Mitty Encampment Abatement – November 2024 Services
$13,181.90
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$10,581.90
520 - Resource Recovery 520 100-100 (Cash & Investments Assets Operating Cash)
$2,600.00
736178 02/28/2025 Open Accounts Payable TY BLOOMQUIST $165.00 Invoice Date Description Amount
TyB110824 11/08/2024 Cell Phone Reimbursement - Ty B Nov 2024 $55.00 TyB120824 12/08/2024 Cell Phone Reimbursement - Ty B Dec 2024 $55.00 TyB010825 01/08/2025 Cell Phone Reimbursement - Ty B Jan 2025 $55.00 Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$165.00
736179 02/28/2025 Open Accounts Payable VERIZON WIRELESS $5,886.98 Invoice Date Description Amount
6102775325-0 01/04/2025 Travis Warner $38.01
6102775325-1 01/04/2025 Diego Rodriguez $47.16
6102775325-2 01/04/2025 Brandon Martinez $38.01
6102775325-3 01/04/2025 Bart Cortez $38.01
6102775325-4 01/04/2025 Street Lights $38.01
6102775325-5 01/04/2025 Quinton Adams $47.16
6102775325-6 01/04/2025 Fleet/Mechanic Shop $38.01
6102775325-7 01/04/2025 Adrian Sanchez $38.01
6102775325-8 01/04/2025 Building Attendants Quinlan $47.16 6102775325-9 01/04/2025 Piu Ghosh $47.16
6102775325-10 01/04/2025 Ursula Syrova $47.16
6102775325-11 01/04/2025 Paul Tognetti $38.01
6102775325-12 01/04/2025 Kristina Alfaro $47.16
6102775325-13 01/04/2025 Paul Sapudar $38.01
6102775325-14 01/04/2025 Antonio Torrez $47.16
6102775325-15 01/04/2025 Roberto Montez $38.01
6102775325-16 01/04/2025 Toan Quach $47.16
6102775325-17 01/04/2025 April Darosa $47.16
6102775325-18 01/04/2025 Jared Lopez $38.01
6102775325-19 01/04/2025 Street Tree Maintenance #4 $38.01 6102775325-20 01/04/2025 Aaron Saiz $38.01
6102775325-21 01/04/2025 Victor Espinoza $38.01
Tuesday, March 4, 2025Pages: 10 of 30user: Vi Tran 99
CC 03-18-2025
99 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
6102775325-22 01/04/2025 Andrew Schmitt $42.16
6102775325-23 01/04/2025 Shawn Tognetti $47.16
6102775325-24 01/04/2025 Phuong Devries $47.16
6102775325-25 01/04/2025 Victoria Morin $38.01
6102775325-26 01/04/2025 Jonathan Ferrante $47.16
6102775325-27 01/04/2025 Rachelle Sander Mifi $38.01
6102775325-28 01/04/2025 Brian Gathers $38.01
6102775325-29 01/04/2025 Michael Woo $47.16
6102775325-30 01/04/2025 Aldo Corral $38.01
6102775325-31 01/04/2025 Pamela Wu $47.16
6102775325-32 01/04/2025 Diego Rodriguez $38.01
6102775325-33 01/04/2025 Michael Kimball $38.01
6102775325-34 01/04/2025 Sean Hatch $47.16
6102775325-35 01/04/2025 Blackberry Golf $38.01
6102775325-36 01/04/2025 Chad Mosley $38.01
6102775325-37 01/04/2025 Sonya Lee $47.16
6102775325-38 01/04/2025 Andy Badal $38.01
6102775325-39 01/04/2025 Frank Villa $38.01
6102775325-40 01/04/2025 David Stillman $47.16
6102775325-41 01/04/2025 Ty Bloomquist $38.01
6102775325-42 01/04/2025 Manuel Barragan $52.96
6102775325-43 01/04/2025 James Lee $47.16
6102775325-44 01/04/2025 M. Jonathan Ferrante $38.01
6102775325-45 01/04/2025 Shawn Tognetti $38.01
6102775325-46 01/04/2025 On-Call Service Center $41.01
6102775325-47 01/04/2025 Jonathan Ferrante $38.01
6102775325-48 01/04/2025 Kevin Riedan $38.01
6102775325-49 01/04/2025 Michael Garcia $38.01
6102775325-50 01/04/2025 Frank Villa $47.16
6102775325-51 01/04/2025 Thomas Chin $47.16
6102775325-52 01/04/2025 Sean Filbeck $38.01
6102775325-53 01/04/2025 Nicole Rodriguez $38.01
6102775325-54 01/04/2025 Susan Michael $47.16
6102775325-55 01/04/2025 Jo Nguyen $42.16
6102775325-56 01/04/2025 Vanessa Guerra $47.16
6102775325-57 01/04/2025 Serena Tu $26.31
6102775325-58 01/04/2025 Jimmy Tan $47.16
6102775325-59 01/04/2025 Luke Connolly $47.16
6102775325-60 01/04/2025 Rodney Weathers $47.16
6102775325-61 01/04/2025 Junnie Hemann $38.01
6102775325-62 01/04/2025 Bart Cortez $42.16
6102775325-63 01/04/2025 Janet Liang $47.16
6102775325-64 01/04/2025 Jerry Anderson $38.01
6102775325-65 01/04/2025 Quinton Mifi 1 $38.01
6102775325-66 01/04/2025 Andrew Schmitt Mifi 2 $38.01
6102775325-67 01/04/2025 Amanda Hui $47.16
6102775325-68 01/04/2025 Brian Policriti $38.01
6102775325-69 01/04/2025 Alfredo Alegria $38.01
6102775325-70 01/04/2025 Branden Puorro $38.01
6102775325-71 01/04/2025 Ralph Aquinaga $38.01
Tuesday, March 4, 2025Pages: 11 of 30user: Vi Tran 100
CC 03-18-2025
100 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
6102775325-72 01/04/2025 Domingo Santos $38.01
6102775325-73 01/04/2025 Paul Tognetti $47.16
6102775325-74 01/04/2025 Nathan Vasquez $47.16
6102775325-75 01/04/2025 Fernando Jimenez $38.01
6102775325-76 01/04/2025 Christopher Jensen $47.16
6102775325-77 01/04/2025 Adrian Melendez $38.01
6102775325-78 01/04/2025 Monica Diaz $47.16
6102775325-79 01/04/2025 Danielle Carriendo $47.16
6102775325-80 01/04/2025 Kevin Green $38.01
6102775325-81 01/04/2025 Jeff Trybus $47.16
6102775325-82 01/04/2025 Alex Wykoff $47.16
6102775325-83 01/04/2025 Jonathan Williams $38.01
6102775325-84 01/04/2025 Frankie De Leon $38.01
6102775325-85 01/04/2025 John Ramos $38.01
6102775325-86 01/04/2025 Peter Arnst $38.01
6102775325-87 01/04/2025 Benjamin Fu $47.16
6102775325-88 01/04/2025 Lori Baumgartner $47.16
6102775325-89 01/04/2025 Josh Illnicki $38.01
6102775325-90 01/04/2025 Kyle Garcia $14.73
6102775325-91 01/04/2025 Gina Zendejas $38.01
6102775325-92 01/04/2025 Saul Herrara $38.01
6102775325-93 01/04/2025 Domingo Santos $47.16
6102775325-94 01/04/2025 Richard Banda $38.01
6102775325-95 01/04/2025 Michael Miranda $47.16
6102775325-96 01/04/2025 Tree Crew Ipad 3 $38.01
6102775325-97 01/04/2025 Samantha Locurto $47.16
16102775325-98 01/04/2025 Ray Wang $134.05
6102775325-99 01/04/2025 Jose Torres $47.16
6102775325-100 01/04/2025 Bill Bridge $38.01
6102775325-101 01/04/2025 Brad Alexander $38.01
6102775325-102 01/04/2025 John Stiehr $38.01
6102775325-103 01/04/2025 Jose Ramirez $38.01
6102775325-104 01/04/2025 Jessica Javier $47.16
6102775325-105 01/04/2025 Jonathan Orozco $47.16
6102775325-106 01/04/2025 Pete Coglianese $47.16
6102775325-107 01/04/2025 Torin Scott $47.16
6102775325-108 01/04/2025 Rei Delgado $47.16
6102775325-109 01/04/2025 Robert Griffiths $47.16
6102775325-110 01/04/2025 T. Internet Emergncyvan $38.01 6102775325-111 01/04/2025 Amanda Hui Travel Phone $47.16 6102775325-112 01/04/2025 Ricardo Alvarez $38.01
6102775325-113 01/04/2025 Larry Lopez $38.01
6102775325-114 01/04/2025 Park Ranger Corridor $47.16
6102775325-115 01/04/2025 Rachelle Sander $47.16
6102775325-116 01/04/2025 Dan Vasquez $47.16
6102775325-117 01/04/2025 Karan Malhi $47.16
6102775325-118 01/04/2025 Serena Tu $20.85
6102775325-119 01/04/2025 Christopher Bottel $38.01
6102775325-120 01/04/2025 Michael Chandler $47.16
6102775325-121 01/04/2025 Kirsten Squarcia $47.16
Tuesday, March 4, 2025Pages: 12 of 30user: Vi Tran 101
CC 03-18-2025
101 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
6102775325-122 01/04/2025 Daniel Barone $38.01
6102775325-123 01/04/2025 Liang Chao $47.16
6102775325-124 01/04/2025 Kitty Moore $47.16
6102775325-125 01/04/2025 Hung Wei $47.16
6102775325-126 01/04/2025 Tommy Yu $47.16
6102775325-127 01/04/2025 Nathan Vasquez $38.01
6102775325-128 01/04/2025 Michael Chandler $38.01
6102775325-129 01/04/2025 Robert Griffiths $38.01
6102775325-130 01/04/2025 Michael Miranda $38.01
6102775325-131 01/04/2025 Alex Greer $47.16
6102775325-132 01/04/2025 Rodney Weathers $38.01
6102775325-133 01/04/2025 James Lee $38.01
6102775325-134 01/04/2025 Daniel Degu $47.16
6102775325-135 01/04/2025 Tina Kapoor $47.16
6102775325-136 01/04/2025 Jr Fruen $47.16
6102775325-137 01/04/2025 Sheila Mohan $47.16
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,712.17
230 - Env Mgmt Cln Crk Strm Drain 230 100-100 (Cash & Investments Assets Operating Cash)
$90.97
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$342.09
520 - Resource Recovery 520 100-100 (Cash & Investments Assets Operating Cash)
$179.49
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$38.01
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$38.01
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$410.22
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$76.02
736180 02/28/2025 Open Accounts Payable CAM HISCOCK $424.58 Invoice Date Description Amount
349986 02/12/2025 REFUND 10132 BILICH BLD-2024-2520 $424.58 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$424.58
736181 02/28/2025 Open Accounts Payable De Anza Optimist Club of Cupertino $630.00 Invoice Date Description Amount
2010092.030 02/14/2025 QCC- 3.27.25- Cupertino Room Security Deposit Refund
$630.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$630.00
736182 02/28/2025 Open Accounts Payable FREEDOM FOREVER LLC $744.30 Invoice Date Description Amount
348606-348625 02/13/2025 REFUND 20051 NORTHWOOD BLD-2024-2269 $744.30 Paying Fund Cash Account Amount
Tuesday, March 4, 2025Pages: 13 of 30user: Vi Tran 102
CC 03-18-2025
102 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$744.30
736183 02/28/2025 Open Accounts Payable HATHAWAY DINWIDDIE CONSTRUCTION CO.
$10,000.00
Invoice Date Description Amount
325175 02/11/2025 REFUND 10431 N DE ANZA BLVD BLD-2022-0214 $10,000.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$10,000.00
736184 02/28/2025 Open Accounts Payable John Vasconcellos $75.89 Invoice Date Description Amount
JV021325 02/13/2025 customer has double paid an amount $75.89 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$75.89
736185 02/28/2025 Open Accounts Payable Sunil Satnur $100.00 Invoice Date Description Amount
2010087.030 02/14/2025 QCC- 2.08.25- Creekside Park Building Security Deposit Refund
$100.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$100.00
736186 02/28/2025 Open Accounts Payable TUFF SHED $616.81 Invoice Date Description Amount
348794 10/23/2024 REFUND 21362 MILFORD DR. ZV-2024-005
WITHDRAWN
$616.81
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$616.81
Type Check Totals: 43 Transactions $1,716,902.56
EFT
41766 02/18/2025 Open Accounts Payable EMPLOYMENT DEVEL DEPT $45,896.48 Invoice Date Description Amount
02072025 02/07/2025 CA State Tax pp 1/25/25-2/7/25 $45,896.48 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$45,896.48
41767 02/18/2025 Open Accounts Payable IRS $146,115.84
Invoice Date Description Amount
02072025 02/07/2025 Federal Tax pp 1/25/25-2/7/25 $146,115.84 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$146,115.84
41768 02/20/2025 Open Accounts Payable P E R S $168,762.35 Invoice Date Description Amount
02072025 02/07/2025 PERS pp 1/25/25-2/7/25 $168,762.35
Paying Fund Cash Account Amount
Tuesday, March 4, 2025Pages: 14 of 30user: Vi Tran 103
CC 03-18-2025
103 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$168,762.35
41769 02/28/2025 Open Accounts Payable Colonial Life & Accident Insurance $29.16 Invoice Date Description Amount
02212025 02/21/2025 Colonial Products pp 2/8/25-2/21/25 $29.16 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$29.16
41770 02/28/2025 Open Accounts Payable Employment Development $10,814.47 Invoice Date Description Amount
02212025 02/21/2025 State Disability Insurance pp 2/8/25-2/21/25 $10,814.47 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$10,814.47
41771 02/28/2025 Open Accounts Payable National Deferred (ROTH) $3,410.00 Invoice Date Description Amount
02212025 02/21/2025 Nationwide Roth pp 2/8/25-2/21/25 $3,410.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,410.00
41772 02/28/2025 Open Accounts Payable National Deferred Compensation $21,919.42 Invoice Date Description Amount
02212025 02/21/2025 Nationwide Deferred Compensation pp 2/8/25-2/21/25 $21,919.42 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$21,919.42
41773 02/28/2025 Open Accounts Payable PERS-457K $15,861.98 Invoice Date Description Amount
02212025 02/21/2025 PERS 457K pp 2/8/25-2/21/25 $15,861.98 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$15,861.98
41774 02/28/2025 Open Accounts Payable State Disbursement Unit $603.49 Invoice Date Description Amount
02212025 02/21/2025 Child Support pp 2/8/25-2/21/25 $603.49 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$603.49
41775 02/28/2025 Open Accounts Payable ABOLI JAYDEEP RANADE $156.00 Invoice Date Description Amount
022825 AJR 02/19/2025 payment for February classes $156.00 Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$156.00
Tuesday, March 4, 2025Pages: 15 of 30user: Vi Tran 104
CC 03-18-2025
104 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41776 02/28/2025 Open Accounts Payable All City Management Services, Inc. $18,324.81 Invoice Date Description Amount
98781 02/05/2025 School Crossing Guard Services through 01192025- 02012025
$18,324.81
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$18,324.81
41777 02/28/2025 Open Accounts Payable Amazon Capital Services $80.19 Invoice Date Description Amount
1JLF-VJC7-3X44 02/16/2025 CDD Office Supplies and Building Inspector Materials $50.94 1P3T-KXCT-DKFJ 02/18/2025 CDD Office Supplies $29.25
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$80.19
41778 02/28/2025 Open Accounts Payable Amazon Web Services, Inc. $710.63 Invoice Date Description Amount
2028187553 02/01/2025 AWS GIS January 1 - January 31, 2025 $710.63 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$710.63
41779 02/28/2025 Open Accounts Payable Andy Badal $46.98 Invoice Date Description Amount
AndyB022225 01/22/2025 Andy 408.857.0630 Cell reimbursement Jan 23 - Feb 22, 2025
$46.98
Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$46.98
41780 02/28/2025 Open Accounts Payable Aquatic Central $3,000.00 Invoice Date Description Amount
100029 02/15/2025 Facilities - Library Aquarium Maint. Feb. 2025 $3,000.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,000.00
41781 02/28/2025 Open Accounts Payable B&H PHOTO-VIDEO $13,636.55 Invoice Date Description Amount
231574079 02/09/2025 Video: EPSON 13000-LUMEN WUXGA LSR 3LCD
PRJCTR/BLK
$13,351.20
231531744 02/06/2025 Video: 1x EPSON HD BASET TRANSMITTER AND
CONTROL PAD
$285.35
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$13,636.55
41782 02/28/2025 Open Accounts Payable BKF Engineers $8,308.80 Invoice Date Description Amount
24110786 11/18/2024 Jollyman Park Playground through 09302024- 10272024
$8,239.20
25010409 01/11/2025 Jollyman Park Restrom through 12302024-12292024 $69.60 Paying Fund Cash Account Amount
Tuesday, March 4, 2025Pages: 16 of 30user: Vi Tran 105
CC 03-18-2025
105 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$8,308.80
41783 02/28/2025 Open Accounts Payable BRIAN GATHERS $55.00 Invoice Date Description Amount
BrianG020425 02/04/2025 Cell Phone Reimbursement - Brian G 01.05.25 to
02.04.25 $55.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$55.00
41784 02/28/2025 Open Accounts Payable Christina Lopez $55.00 Invoice Date Description Amount
ChristL011325 01/13/2025 Cell Phone Service Jan14-Feb13 $55.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$55.00
41785 02/28/2025 Open Accounts Payable City of San Jose $82,682.61 Invoice Date Description Amount
1259701 02/11/2025 Animal Services - 01-03/2025 $82,682.61 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$82,682.61
41786 02/28/2025 Open Accounts Payable CodeLinkd, LLC $684.00 Invoice Date Description Amount
CODEL_FALL24-3 12/12/2024 CODELINKD_FALL24_PAYMENT 3_9.12-12.12 $684.00 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$684.00
41787 02/28/2025 Open Accounts Payable Continental Battery Systems $506.50 Invoice Date Description Amount
35322502031337 02/07/2025 Fleet- Core Charges & Automotive Junk Exchange $506.50 Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$506.50
41788 02/28/2025 Open Accounts Payable Craig Whittom Consulting $2,047.50 Invoice Date Description Amount
00093 02/01/2025 Project Management - 2025/01 $2,047.50 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,047.50
41789 02/28/2025 Open Accounts Payable CSG Consultants, Inc. $32,032.50 Invoice Date Description Amount
59886 02/06/2025 Bridge Preventative Maintenance through 12282024- 01312025
$1,320.00
59887 02/06/2025 Pavement Maintenance Phase 1 through 12282024- 01312025
$30,712.50
Paying Fund Cash Account Amount
Tuesday, March 4, 2025Pages: 17 of 30user: Vi Tran 106
CC 03-18-2025
106 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$32,032.50
41790 02/28/2025 Open Accounts Payable Cupertino Supply, Inc $1,576.04 Invoice Date Description Amount
375662 02/07/2025 Facilities- Cleanout Plug Wrench $46.98 375475 02/05/2025 Grounds- Elbows, Valve, Brass Unions, Adapters, Clamps, Beam
$1,016.16
375777 02/10/2025 Trees/ROW- Pipe, Sealant, Copper Elbow, Valve, Adapters, Tape
$371.42
376069 02/12/2025 Facilities- Sloan Spud Assembly $23.18 376026 02/12/2025 Facilities- Wax, Sloan Breaker Tailpiece $74.65 376178 02/13/2025 Grounds- PVC Pipe $64.60
376182 02/13/2025 Grounds- Credit for #376178 for PVC Pipe ($20.95) Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,576.04
41791 02/28/2025 Open Accounts Payable Dan Gertmenian $113,996.65 Invoice Date Description Amount
DanGFY25-1 02/13/2025 Dan Gertmenian 24-25 Contractor Payment 1 of 2 $113,996.65 Paying Fund Cash Account Amount
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$113,996.65
41792 02/28/2025 Open Accounts Payable Dell Marketing L.P. $47,145.18 Invoice Date Description Amount
10798467572 02/07/2025 148x Adobe Sign renewal Pro,14x CC, 3x PS, 1x Capt, 1x Sign
$47,145.18
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$21,389.19
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$25,755.99
41793 02/28/2025 Open Accounts Payable Dominique Couto Cerdeiral $200.00 Invoice Date Description Amount
022825 DCC 02/19/2025 February fitness classes $200.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$200.00
41794 02/28/2025 Open Accounts Payable East Bay Tire Co. $1,368.84 Invoice Date Description Amount
2113650 02/07/2025 Fleet- Good Year All Terrain Tires $1,368.84 Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$1,368.84
41795 02/28/2025 Open Accounts Payable Ecology Action of Santa Cruz $41,296.90 Invoice Date Description Amount
68481 12/31/2024 Pedestrian & Bicycle Safety Training through 10012024-12312024
$23,660.30
Tuesday, March 4, 2025Pages: 18 of 30user: Vi Tran 107
CC 03-18-2025
107 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
68355 09/30/2024 Pedestrian & Bicycle Safety Training through 08012024-09302024
$17,636.60
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$41,296.90
41796 02/28/2025 Open Accounts Payable ECONOMIC & PLANNING SYSTEMS INC
$13,358.75
Invoice Date Description Amount
241073-1 11/30/2024 SummerHill Homes - Fiscal Impact Peer Review - 2024/11
$9,847.50
241073-2 12/31/2024 SummerHill Homes - Fiscal Impact Peer Review - 2024/12
$3,511.25
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$13,358.75
41797 02/28/2025 Open Accounts Payable Eflex Group, Inc $4,123.04 Invoice Date Description Amount
02212025 02/21/2025 FSA pp 2/8/25-2/21/25 $4,123.04
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,123.04
41798 02/28/2025 Open Accounts Payable Elham Kaviani $560.00 Invoice Date Description Amount
022825 EK 02/19/2025 February fitness classes $560.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$560.00
41799 02/28/2025 Open Accounts Payable Enterprise FM Trust $572.73 Invoice Date Description Amount
FBN5257895 02/06/2025 Fleet- February 2025 Ford Escape Vin# 9773 $572.73 Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$572.73
41800 02/28/2025 Open Accounts Payable Environmental Innovations, Inc $785.00 Invoice Date Description Amount
2903 02/03/2025 SUPs Ordinance Compliance- January 2025 services $785.00 Paying Fund Cash Account Amount
520 - Resource Recovery 520 100-100 (Cash & Investments Assets Operating Cash)
$785.00
41801 02/28/2025 Open Accounts Payable Ewing Irrigation Products Inc. $3,350.70 Invoice Date Description Amount
24772186 01/30/2025 Grounds- White Aero Paint $3,074.71 24645821 01/13/2025 Grounds- Delta Blue Rye Sod $275.99 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,350.70
Tuesday, March 4, 2025Pages: 19 of 30user: Vi Tran 108
CC 03-18-2025
108 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41802 02/28/2025 Open Accounts Payable GARDENLAND POWER
EQUIPMENT
$144.26
Invoice Date Description Amount
1152293 02/06/2025 Fleet- Carburetor Assembly $144.26
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$144.26
41803 02/28/2025 Open Accounts Payable Grace Duval $1,672.00 Invoice Date Description Amount
022825 GD 02/19/2025 Personal training payment $1,672.00 Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$1,672.00
41804 02/28/2025 Open Accounts Payable GRAINGER INC $2,175.17 Invoice Date Description Amount
9394188065 02/03/2025 Grounds- Sideview Magnetic Mirror $109.30 9400723707 02/07/2025 Facilities- Washout Urinal Wall Top Spud, Flange Kit $211.76 9393890711 02/03/2025 Fleet- First Aid Kit $204.49
9391150241 01/30/2025 Facilities- Diaphragm Assemblies, Vacuum Breaker Repair Kit....
$1,649.62
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,970.68
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$204.49
41805 02/28/2025 Open Accounts Payable Gregory Card $436.57 Invoice Date Description Amount
GC011225 01/12/2025 Reimbursement - GC CAPPO Conf $436.57 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$436.57
41806 02/28/2025 Open Accounts Payable Gym Precision, Inc. $1,199.97 Invoice Date Description Amount
20357 02/03/2025 Service Order#24014. Life fitness elliptical needs a new right a
$874.97
20398 02/18/2025 Service Order# 24236. Diagnosed a treadmilll and a elliptical. A
$325.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$1,199.97
41807 02/28/2025 Open Accounts Payable Health and Human Resource Center, Inc.
$273.02
Invoice Date Description Amount
E0336561 01/06/2025 February 2025 EAP Benefit 187 Enrollees $273.02 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$273.02
Tuesday, March 4, 2025Pages: 20 of 30user: Vi Tran 109
CC 03-18-2025
109 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41808 02/28/2025 Open Accounts Payable Health Care Employees $28,575.00 Invoice Date Description Amount
361136-361138 01/21/2025 February 2025 Dental Benefit 250 Enrollees $28,575.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$28,575.00
41809 02/28/2025 Open Accounts Payable IFPTE LOCAL 21 $2,019.00 Invoice Date Description Amount
02212025 02/21/2025 Association Dues - CEA pp 2/8/25-2/21/25 $2,019.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,019.00
41810 02/28/2025 Open Accounts Payable IMPEC GROUP INC,. $73,975.26 Invoice Date Description Amount
2501134 01/31/2025 Facilities- January 2025 Janitorial Services $70,262.01 2501302 01/31/2025 Facilities- Supplies for Park Restrooms $3,713.25 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$64,448.26
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$1,159.00
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$8,368.00
41811 02/28/2025 Open Accounts Payable InservH2O Inc. $834.80 Invoice Date Description Amount
4753 02/07/2025 Facilities- Water Treatment Feb 2025 $834.80 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$834.80
41812 02/28/2025 Open Accounts Payable Interstate Traffic Control Products, Inc.
$1,445.12
Invoice Date Description Amount
268048 02/10/2025 Street- White & Yellow Posts $1,445.12 Paying Fund Cash Account Amount
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$1,445.12
41813 02/28/2025 Open Accounts Payable Jahara Pagadipaala $200.00 Invoice Date Description Amount
022825 JP 02/19/2025 February fitness classes $200.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$200.00
41814 02/28/2025 Open Accounts Payable JAMES COLVIN $3,432.00 Invoice Date Description Amount
022825 JC 02/19/2025 payment for personal training $3,432.00 Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$3,432.00
Tuesday, March 4, 2025Pages: 21 of 30user: Vi Tran 110
CC 03-18-2025
110 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41815 02/28/2025 Open Accounts Payable Jarvis Fay LLP $3,046.00 Invoice Date Description Amount
19950 01/31/2025 Legal Services through 01012025-01312025 $3,046.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,046.00
41816 02/28/2025 Open Accounts Payable Jason Wong $55.00 Invoice Date Description Amount
JasonW02062025 02/06/2025 Cell Phone Reimbursement through 02062025 $55.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$55.00
41817 02/28/2025 Open Accounts Payable JENNIFER HILL $451.00 Invoice Date Description Amount
02825 JH 02/19/2025 February fitness classes $451.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$369.00
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$82.00
41818 02/28/2025 Open Accounts Payable Jerry Anderson $55.00 Invoice Date Description Amount
JerryA012425 01/24/2025 Cell Phone Reimbursement - Jerry A 12.25.24 to
01.24.25 $55.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$55.00
41819 02/28/2025 Open Accounts Payable KIMBALL-MIDWEST $2,195.21 Invoice Date Description Amount
103034998 02/04/2025 Street- Hose Reel, Blow Gun, Coupler, Nipple, Grinder $779.21 103054416 02/11/2025 Fleet- Black Cable Tie, Plow Bolt, Hex Nut $178.20 103055760 02/11/2025 Street- Alloy Flat Washer, FLM Amp Fuses $992.27 103054415 02/11/2025 Street- Right Angle Cut-Off Tool $245.53 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,017.01
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$178.20
41820 02/28/2025 Open Accounts Payable KIMBERLY LUNT $55.00 Invoice Date Description Amount
KimL_02.12.2025 02/12/2025 Kim L Cell Ph Reimbursement 01.13.25 - 02.12.25 $55.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$55.00
41821 02/28/2025 Open Accounts Payable Klarity Consulting, LLC $720.00 Invoice Date Description Amount
2024-020 02/10/2025 Executive Coaching & Mentoring – January 2025 Services
$720.00
Tuesday, March 4, 2025Pages: 22 of 30user: Vi Tran 111
CC 03-18-2025
111 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$720.00
41822 02/28/2025 Open Accounts Payable Li-Fen Lin $200.00 Invoice Date Description Amount
022825 LFL 02/19/2025 February fitness classes $200.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$200.00
41823 02/28/2025 Open Accounts Payable Life Insurance Company of North America
$7,951.79
Invoice Date Description Amount
15487_020125 02/21/2025 February 2025 New York Life $7,951.79 Paying Fund Cash Account Amount
641 - Compensated Absence/LTD 641 100-100 (Cash & Investments Assets Operating Cash)
$7,951.79
41824 02/28/2025 Open Accounts Payable Logik Systems, Inc $11,045.59 Invoice Date Description Amount
INV282063 02/11/2025 FY 24-25 Logikcull EDiscovery SaaS Subscription 5/24/24-5/23/25
$11,045.59
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$11,045.59
41825 02/28/2025 Open Accounts Payable MissionSquare 300292 $19,307.53 Invoice Date Description Amount
02212025 02/21/2025 ICMA pp 2/8/25-2/21/25 $19,307.53
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$19,307.53
41826 02/28/2025 Open Accounts Payable MNS Engineers, Inc. $1,750.00 Invoice Date Description Amount
88912 02/20/2025 CDBG Administrative Services - 2025/01 $1,750.00 Paying Fund Cash Account Amount
260 - CDBG 260 100-100 (Cash & Investments Assets Operating Cash)
$1,750.00
41827 02/28/2025 Open Accounts Payable MONICA G. RANES-GOLDBERG $714.00 Invoice Date Description Amount
022825 MGRG 02/19/2025 February fitness classes $714.00 Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$714.00
41828 02/28/2025 Open Accounts Payable Moore lacofano Goltsman, Inc. $17,206.00 Invoice Date Description Amount
0089894 01/31/2025 Jollyman Park All-Inclusive through 12012024- 12312024
$11,250.00
0089895 01/31/2025 Lawrence-Mitty Park & Trail Master Plan through 120124-123124
$5,956.00
Paying Fund Cash Account Amount
Tuesday, March 4, 2025Pages: 23 of 30user: Vi Tran 112
CC 03-18-2025
112 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
280 - Park Dedication 280 100-100 (Cash & Investments Assets Operating Cash)
$5,956.00
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$11,250.00
41829 02/28/2025 Open Accounts Payable Moss Adams LLP $4,275.00 Invoice Date Description Amount
102701218 02/17/2025 Professional Services JAN 25 $4,275.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,275.00
41830 02/28/2025 Open Accounts Payable Ninyo Moore $9,453.00 Invoice Date Description Amount
299014 02/13/2025 Jollyman Park All-Inclusive Geotech through 01312025 $9,453.00 Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$9,453.00
41831 02/28/2025 Open Accounts Payable Nomad Transit LLC $244,881.17 Invoice Date Description Amount
INV001-13574 01/31/2025 Via Cupertino Shuttle through January 2025 $244,881.17 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$244,881.17
41832 02/28/2025 Open Accounts Payable ODP Business Solutions, LLC. $129.40 Invoice Date Description Amount
408152896001 01/30/2025 Color Paper and Printer Paper Supply $129.40 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$129.40
41833 02/28/2025 Open Accounts Payable OLM Recycling Services LLC $1,364.50 Invoice Date Description Amount
4949 01/24/2025 Street- Ewaste Pickup $1,364.50
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,364.50
41834 02/28/2025 Open Accounts Payable PARS/City of Cupertino $3,818.05 Invoice Date Description Amount
02212025 02/21/2025 PARS pp 2/8/25-2/21/25 $3,818.05
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$3,818.05
41835 02/28/2025 Open Accounts Payable PDQ.COM CORPORATION $747.93 Invoice Date Description Amount
PDQ-40507 02/10/2025 FY25 SmartDeploy Essential & Pro $747.93 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$747.93
Tuesday, March 4, 2025Pages: 24 of 30user: Vi Tran 113
CC 03-18-2025
113 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41836 02/28/2025 Open Accounts Payable Professional Turf Management, Inc. $18,693.56 Invoice Date Description Amount
1296 01/31/2025 Grounds - Jan 2025 Golf Course Turf Maintenance $18,693.56 Paying Fund Cash Account Amount
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$18,693.56
41837 02/28/2025 Open Accounts Payable QLM, Inc. $360,029.33 Invoice Date Description Amount
5620 12/31/2024 All Inclusive Playground through 12012024-12312024 $269,065.41 5652 02/04/2025 All Inclusive Playground through 01012025-01312025 $90,963.92 Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$360,029.33
41838 02/28/2025 Open Accounts Payable R & R INDUSTRIES, INC. $4,871.99 Invoice Date Description Amount
685309 01/30/2025 Uniform Shirts $4,871.99
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,684.58
230 - Env Mgmt Cln Crk Strm Drain 230 100-100 (Cash & Investments Assets Operating Cash)
$187.41
41839 02/28/2025 Open Accounts Payable Raimi & Associates, Inc. $4,483.08 Invoice Date Description Amount
24-6761 01/28/2025 Reach Code Outreach- December 2024 services $4,483.08 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$4,483.08
41840 02/28/2025 Open Accounts Payable Raychel Renee Balcioni Cruz $1,380.00 Invoice Date Description Amount
022825 RRBC 02/20/2025 February 2 personal training $1,380.00 Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$1,380.00
41841 02/28/2025 Open Accounts Payable Red Wing Business Advantage Account
$400.00
Invoice Date Description Amount
20250210074592 02/10/2025 Safety Boots- Jonathan Williams, Aaron Saiz $400.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$400.00
41842 02/28/2025 Open Accounts Payable RRM DESIGN GROUP $1,151.00 Invoice Date Description Amount
1832-00-1124 02/07/2025 Architectual Review Services - 2024/11 $1,151.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,151.00
Tuesday, March 4, 2025Pages: 25 of 30user: Vi Tran 114
CC 03-18-2025
114 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
41843 02/28/2025 Open Accounts Payable She Z Products, Inc. $724.06 Invoice Date Description Amount
Shez022625 02/24/2025 Charcuterie Boards for State of the City 2025 $724.06 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$724.06
41844 02/28/2025 Open Accounts Payable Sign Solutions USA, LLC $1,158.01 Invoice Date Description Amount
415791 02/06/2025 Street- School Sign $679.11
415803 02/07/2025 Street- 30"x50yd 7310 White Advanced Sign $478.90 Paying Fund Cash Account Amount
270 - Transportation Fund 270 100-100 (Cash & Investments Assets Operating Cash)
$1,158.01
41845 02/28/2025 Open Accounts Payable SimpliGov LLC $20,000.00 Invoice Date Description Amount
2977 02/04/2025 SimpliGov Automation Platform Base Subscription $20,000.00 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$20,000.00
41846 02/28/2025 Open Accounts Payable SONIA DOGRA $195.00 Invoice Date Description Amount
022825 SD 02/19/2025 February fitness classes $195.00
Paying Fund Cash Account Amount
570 - Sports Center 570 100-100 (Cash & Investments Assets Operating Cash)
$195.00
41847 02/28/2025 Open Accounts Payable Spectrio LLC $1,200.00 Invoice Date Description Amount
1775276 02/18/2025 Video: CMS Essential Digital Signage CMS Essential Subscription
$1,200.00
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$1,200.00
41848 02/28/2025 Open Accounts Payable Starbird Consulting LLC $1,270.50 Invoice Date Description Amount
0260 02/17/2025 McClellan Ranch West Parking Lot through January 24, 2025
$1,270.50
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$1,270.50
41849 02/28/2025 Open Accounts Payable SUNNYVALE FORD, INC. $911.49 Invoice Date Description Amount
252195FOW 02/07/2025 Fleet- HV Valve $50.28
251975FOW 02/04/2025 Fleet- HV Tanks $114.07
251963FOW 02/04/2025 Fleet- HV Cap $19.30
251965FOW 02/04/2025 Fleet- HV Hose $126.61
251815FOW 02/03/2025 Fleet- HV Grommet, HV Handle $55.95 251910FOW 02/03/2025 Fleet- HV Tank $114.07
252411FOW 02/12/2025 Fleet- HV Wheel $283.73
Tuesday, March 4, 2025Pages: 26 of 30user: Vi Tran 115
CC 03-18-2025
115 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
252360FOW 02/12/2025 Fleet- HV Lamp $147.48
Paying Fund Cash Account Amount
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$911.49
41850 02/28/2025 Open Accounts Payable SVA Architects, Inc. $6,750.00 Invoice Date Description Amount
62753 10/31/2024 Sports Center Locker Room Renovation through 10312024
$6,750.00
Paying Fund Cash Account Amount
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$6,750.00
41851 02/28/2025 Open Accounts Payable TERRYBERRY COMPANY LLC $299.54 Invoice Date Description Amount
S23511 11/27/2024 Retirement Recognition $299.54
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$299.54
41852 02/28/2025 Open Accounts Payable Tesco Controls, LLC $30,282.19 Invoice Date Description Amount
0084111-IN 10/29/2024 Traffic 15 x Line-Interactive Inverter $30,282.19 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$30,282.19
41853 02/28/2025 Open Accounts Payable THE HARTFORD $10,879.20 Invoice Date Description Amount
656342933045 02/21/2025 City of Cupertino Benefit -Feb 2025-Cust #003264250001
$10,879.20
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$10,879.20
41854 02/28/2025 Open Accounts Payable THE HARTFORD $348.77 Invoice Date Description Amount
756342964749 02/21/2025 City of Cupertino Benefit -Feb 2025-Cust #003264250002
$348.77
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$348.77
41855 02/28/2025 Open Accounts Payable TPx Communications $1,953.52 Invoice Date Description Amount
184076591-0 01/31/2025 FY25 VoIP Telephone Services January 2025 $1,953.52 Paying Fund Cash Account Amount
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$1,953.52
41856 02/28/2025 Open Accounts Payable US BANK $19,316.75 Invoice Date Description Amount
KimL02062025 02/06/2025 5169 CC Charges $305.00
Kaylan020625 02/06/2025 4186 CC Charges $310.00
RobertK020625 02/06/2025 7858 CC Charges $241.45
Tuesday, March 4, 2025Pages: 27 of 30user: Vi Tran 116
CC 03-18-2025
116 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
UrsulaS020625 02/06/2025 2512 CC Charges $0.76
JimF020625 02/06/2025 2514 CC Charges ($631.60)
MelissaR020625 02/06/2025 0572 CC Charges $623.14
AndrewS020625 02/06/2025 9993 CC Charges $326.46
DanielB020625 02/06/2025 8684 CC Charges $252.67
JerryA020625 02/06/2025 8636 CC Charges $90.00
CrystiG020625 02/06/2025 8774 CC Charges $273.34
JasonB020625 02/06/2025 CC Charges 3965 $18.85
KevinG020625 02/06/2025 5856 CC Charges $700.00
RobertG020625 02/06/2025 0760 CC Charges $274.60
TravisW020625 02/06/2025 8746 CC Charges $1,187.95
TyB020625 02/06/2025 7739 CC Charges $2,663.68
RicardoA020625 02/06/2025 9906 CC Charges $350.00
mariahg020625 02/06/2025 7882 CC CHARGES $221.87
DMilesS020625 02/06/2025 3659 CC Charges $393.72
JessicaJ020625 02/06/2025 5617 CC Charges $18.66
SonyaL020625 02/06/2025 8808 CC Charges ($0.09)
RandyV020625 02/06/2025 6283 CC Charges $171.60
SerenaT020625 02/06/2025 0982 CC Charges $378.85
KenE020625 02/06/2025 6671 CC Charges $13.97
BirgitW02062025 02/06/2025 6317 CC Charges $21.47
PamelaW020625 02/06/2025 7313 CC Charges $269.66
LindsayN020625 02/06/2025 4194 CC Charges $810.74
LeungK020625 02/06/2025 1733 CC Charges $251.21
KrisG020625 02/06/2025 6959 CC Charges $2,416.12
BrantonC020625 02/06/2025 0233 CC Charges $825.57
KevinK020625 02/06/2025 8746 CC Charges $109.00
AmandaH020625 02/06/2025 9326 CC Charges $1,900.19
TommyY022125 02/06/2025 3675 CC Charges $1,658.64
JanetL020625 02/06/2025 9949 CC Charges $3,622.50
DebraN020625 02/06/2025 3328 CC Charges ($3,000.00)
MarilynP020625 02/06/2025 6763 CC Charges $2,246.77
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$13,583.92
520 - Resource Recovery 520 100-100 (Cash & Investments Assets Operating Cash)
$0.76
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$273.34
580 - Recreation Program 580 100-100 (Cash & Investments Assets Operating Cash)
$1,100.18
610 - Innovation & Technology 610 100-100 (Cash & Investments Assets Operating Cash)
$3,779.42
630 - Vehicle/Equip Replacement 630 100-100 (Cash & Investments Assets Operating Cash)
$579.13
41857 02/28/2025 Open Accounts Payable Vision Service Plan $2,205.90 Invoice Date Description Amount
822114800 01/19/2025 February 2025 Vision Benefit 135 Enrollees $2,205.90 Paying Fund Cash Account Amount
Tuesday, March 4, 2025Pages: 28 of 30user: Vi Tran 117
CC 03-18-2025
117 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$2,205.90
41858 02/28/2025 Open Accounts Payable Vision Service Plan $958.00 Invoice Date Description Amount
822114805 01/19/2025 February 2025 Vision Benefit 50 Enrollees $958.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$958.00
41859 02/28/2025 Open Accounts Payable Vision Service Plan $947.72 Invoice Date Description Amount
822125997 01/21/2025 February 2025 Vision Benefit 58 Enrollees $947.72 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$947.72
41860 02/28/2025 Open Accounts Payable West Coast Arborists, Inc. $13,006.00 Invoice Date Description Amount
224092 01/16/2025 Grounds- Blackberry Farm Golf Course Fallen Tree Removal
$2,300.00
1-10701 12/05/2024 Peer Review Arborist Report for TR permit - 10621 Madera
$3,287.00
1-10862 02/11/2025 Tamien Innu Trail Arborist Services $519.00 224824-A 02/07/2025 Trees/ROW- Euch Removal at Linda Vista Trail $6,900.00 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$10,187.00
420 - Capital Improvement Fund 420 100-100 (Cash & Investments Assets Operating Cash)
$519.00
560 - Blackberry Farm 560 100-100 (Cash & Investments Assets Operating Cash)
$2,300.00
41861 02/28/2025 Open Accounts Payable West Valley Community Services $18,351.78 Invoice Date Description Amount
WVCSHSGH2HQ2FY25 02/18/2025 General Fund HSG - Q2 (Haven to Home) $18,351.78 Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$18,351.78
41862 02/26/2025 Open Accounts Payable USPS - EFT ONLY $612.29 Invoice Date Description Amount
651131423 02/24/2025 USPS Shipping - PR $612.29
Paying Fund Cash Account Amount
100 - General Fund 100 100-100 (Cash & Investments Assets Operating Cash)
$612.29
Type EFT Totals: 97 Transactions $1,772,257.11
Main Account - Main Checking Account Totals
Checks Status Count Transaction Amount Reconciled Amount Open 43 $1,716,902.56 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Tuesday, March 4, 2025Pages: 29 of 30user: Vi Tran 118
CC 03-18-2025
118 of 541
Payment Register
City of Cupertino
From Payment Date: 2/15/2025 - To Payment Date: 2/28/2025 Number Date Status Void Reason
Reconciled/
Voided Date Source Payee Name
Transaction
Amount
Reconciled
Amount Difference
Total 43 $1,716,902.56 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 97 $1,772,257.11 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 97 $1,772,257.11 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 140 $3,489,159.67 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 140 $3,489,159.67 $0.00
Grand Totals:
Checks Status Count Transaction Amount Reconciled Amount Open 43 $1,716,902.56 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 43 $1,716,902.56 $0.00
EFTs Status Count Transaction Amount Reconciled Amount
Open 97 $1,772,257.11 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Total 97 $1,772,257.11 $0.00
All Status Count Transaction Amount Reconciled Amount
Open 140 $3,489,159.67 $0.00
Reconciled 0 $0.00 $0.00
Voided 0 $0.00 $0.00
Stopped 0 $0.00 $0.00
Total 140 $3,489,159.67 $0.00
Tuesday, March 4, 2025Pages: 30 of 30user: Vi Tran
119
CC 03-18-2025
119 of 541
CITY OF CUPERTINO
Agenda Item
24-13152 Agenda Date: 3/18/2025
Agenda #: 5.
Subject: Construction contract for the 2025 Slurry Seal/Fog Seal Project to Doolittle Construction, LLC. in the amount of $859,000.
1. Award a construction contract for the 2025 Slurry Seal/Fog Seal Project number 2025-102 in the amount of $859,000 to Doolittle Construction, LLC.
2. Reject the non-responsive bid of the lowest bidder.
3. Authorize the City Manager to execute the construction contract with Doolittle Construction, LLC. when all conditions have been met.
4. Authorize the Director of Public Works to execute any necessary construction change orders up to a construction contingency amount of $85,900 (10%) for a total contract amount not to exceed $944,900.
CITY OF CUPERTINO Printed on 3/13/2025Page 1 of 1
powered by Legistar™
120
CC 03-18-2025
120 of 541
1 CITY COUNCIL STAFF REPORT
Meeting: March 18, 2025
Subject
Construction contract for the 2025 Slurry Seal/Fog Seal Project to Doolittle Construction, LLC. in the amount of $859,000.
Recommended Actions
1. Award a construction contract for the 2025 Slurry Seal/Fog Seal Project number 2025-102 in the amount of $859,000 to Doolittle Construction, LLC.
2. Reject the non-responsive bid of the lowest bidder.
3. Authorize the City Manager to execute the construction contract with Doolittle Construction, LLC. when all conditions have been met.
4. Authorize the Director of Public Works to execute any necessary construction change orders up to a construction contingency amount of $85,900 (10%) for a total contract amount not to exceed $944,900.
Reasons for Recommendation
Background
The City of Cupertino performs annual maintenance on its road pavement assets. These efforts include preventative maintenance such as surface treatments, which prolong the useful life of roadway pavements. This 2025 Slurry Seal/Fog Seal Project (Project) consists of preventative maintenance treatments including slurry seal, fog seal and crack seal on identified streets throughout the City.
On January 28, the City publicly advertised the Project. The bid documents issued by the City are available at https://apps.cupertino.org/details/798. Project streets were selected based upon Pavement Condition Index and maintenance history. See Attachment B for the Project street list. A location map is provided as Attachment C.
//
//
//
121
CC 03-18-2025
121 of 541
2 On February 19, the following bids were received:
Bidder Bid Amount
Engineers Estimate $900,000
BuildCorp, Inc. (non-responsive) $857,001
Doolittle Construction, LLC. $859,000
S&H Construction, Inc. $868,600
Pavement Coatings Co. $909,972
VSS $949,120
Sierra Nevada Construction, Inc. $951,507
Graham Contractors $1,182,972
Discussion
The Department of Public Works reviewed proposals for responsiveness and compliance with bid specifications. The apparent low bid received from BuildCorp, Inc., was deemed to be non-responsive due to omissions on the subcontractors list and failure to submit the wet-inked original bid bond per the Instructions to Bidders. Staff recommend the City Council reject this bid as non-responsive.
Staff confirmed the bid from Doolittle Construction, LLC. (“Doolittle”) was responsive, that it had the experience and qualifications to complete the project and thus Doolittle is the lowest responsive and responsible bidder per the Instructions to Bidders and Cupertino Municipal Code. Therefore, staff recommend awarding the construction contract (Attachment A) to Doolittle in the amount of $859,000 and include a 10% construction contingency in the amount of $85,900, for a total contract amount not to exceed $944,900. Construction contingency covers other costs that could be incurred due to unforeseen circumstances and is a typical contracting best practice.
Next Steps
If approved, the City and contractor anticipate work to begin in May 2025 with completion scheduled in July 2025.
If the contract is not approved, the City will cancel the project and defer work to a later date. When applied in a timely manner, these preventative treatments extend the useful life of the pavement.
Sustainability Impact
Maintaining and preserving the local streets and roadway system reduces drive time and traffic congestion, improves bicycle safety, and creates a safer and more appealing pedestrian experience. This leads to reduced vehicle emissions, helping the City achieve air quality and greenhouse gas emission reduction goals.
Fiscal Impact
122
CC 03-18-2025
122 of 541
3 Award of this contract will result in a fiscal impact of up to $944,900, including the base contract and potential contingency. Sufficient funds are budgeted at 270-85-821 900-971 (Capital Outlay Senate Bill 1 Roads). No additional appropriations are needed.
Fiscal Summary
Budget Unit 270-85-821 900-971 Amount
Available funds as of 2/26/25 $1,779,164
Construction Contract ($859,000 base contract
and $85,900 contingency) ($944,900)
Remaining Balance at Completion: $834,264
City Work Program (CWP) Item: No
CWP Item Description: N/A
Council Goal: N/A
California Environmental Quality Act (CEQA)
This project is categorically exempt from CEQA under CEQA Guidelines Section 15301(c) (repair and maintenance of existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities).
_____________________________________
Prepared by: Jo Anne Johnson, Project Manager
Reviewed by: Chad Mosley, Director of Public Works
Approved for Submission by: Pamela Wu, City Manager
Attachments:
A – Draft Contract
B – Location List
C – Location Map
D – Contract Documents - Project Manual
123
CC 03-18-2025
123 of 541
Attachment A – Draft Contract
Contract
This public works contract (“Contract”) is entered into by and between the City of Cupertino (“City”) and Doolittle Construction, LLC (“Contractor”), for work on the 2025 Slurry Seal / Fog Seal Project (“Project”). The parties agree as follows:
1. Award of Contract. In response to the Notice Inviting Bids, Contractor has submitted a Bid Proposal to perform the Work to construct the Project. On March 18, 2025, City authorized award of this Contract to Contractor for the amount set forth in Section 4, below. City has elected to include the following Project alternate(s) in the Contract:
2. Contract Documents. The Contract Documents incorporated into this Contract include and are comprised of all of the documents listed below. The definitions provided in Article 1 of the General Conditions apply to all of the Contract Documents, including this Contract.
2.1 Notice Inviting Bids;
2.2 Instructions to Bidders;
2.3 Addenda, if any;
2.4 Bid Proposal and attachments thereto;
2.5 Contract;
2.6 Payment and Performance Bonds;
2.7 General Conditions;
2.8 Special Conditions;
2.9 Project Plans and Specifications;
2.10 Change Orders, if any;
2.11 Notice of Potential Award;
2.12 Notice to Proceed; and
2.13 The following: Caltrans Standard Details, Location Map, Truck Traffic Restrictions Map, Cupertino Unified School District Calendar, Attachment A – Authorized Lane Closure Hours
3. Contractor’s Obligations. Contractor will perform all of the Work required for the Project, as specified in the Contract Documents. Contractor must provide, furnish, and supply all things necessary and incidental for the timely performance and completion of the Work, including all necessary labor, materials, supplies, tools, equipment, transportation, onsite facilities, and utilities, unless otherwise specified in the Contract Documents. Contractor must use its best efforts to diligently prosecute and complete the Work in a professional and expeditious manner and to meet or exceed the performance standards required by the Contract Documents.
4. Payment. As full and complete compensation for Contractor’s timely performance and completion of the Work in strict accordance with the terms and conditions of the Contract Documents, City will pay Contractor $859,000 (“Contract Price”) for all of Contractor’s direct and indirect costs to perform the Work, including all labor, materials, supplies, equipment, taxes, insurance, bonds and all overhead costs, in accordance with the payment provisions in the General Conditions.
5. Time for Completion. Contractor will fully complete the Work for the Project, meeting all requirements for Final Completion, within 70 calendar days from the start date set forth in the Notice to Proceed (“Contract Time”). By signing below, Contractor expressly waives any claim for delayed early completion.
6. Liquidated Damages. As further specified in Section 5.4 of the General Conditions, if Contractor fails to complete the Work within the Contract Time, City will assess liquidated damages in the amount of $1,500 per day for each day of unexcused delay in achieving 124
CC 03-18-2025
124 of 541
Attachment A – Draft Contract
Final Completion, and such liquidated damages may be deducted from City’s payments due or to become due to Contractor under this Contract.
7. Labor Code Compliance.
7.1 General. This Contract is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, including requirements pertaining to wages, working hours and workers’ compensation insurance, as further specified in Article 9 of the General Conditions.
7.2 Prevailing Wages. This Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Copies of these prevailing rates are available online at http://www.dir.ca.gov/DLSR.
7.3 DIR Registration. City may not enter into the Contract with a bidder without proof that the bidder and its Subcontractors are registered with the California Department of Industrial Relations to perform public work pursuant to Labor Code § 1725.5, subject to limited legal exceptions.
8. Workers’ Compensation Certification. Pursuant to Labor Code § 1861, by signing this Contract, Contractor certifies as follows: “I am aware of the provisions of Labor Code § 3700 which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the Work on this Contract.”
9. Conflicts of Interest. Contractor, its employees, Subcontractors, and agents may not have, maintain, or acquire a conflict of interest in relation to this Contract in violation of any City ordinance or requirement, or in violation of any California law, including Government Code § 1090 et seq., or the Political Reform Act, as set forth in Government Code § 81000 et seq. and its accompanying regulations. Any violation of this Section constitutes a material breach of the Contract.
10. Independent Contractor. Contractor is an independent contractor under this Contract and will have control of the Work and the means and methods by which it is performed. Contractor and its Subcontractors are not employees of City and are not entitled to participate in any health, retirement, or any other employee benefits from City.
11. Notice. Any notice, billing, or payment required by or pursuant to the Contract Documents must be made in writing, signed, dated, and sent to the other party by personal delivery, U.S. Mail, a reliable overnight delivery service, or by email as a PDF file. Notice is deemed effective upon delivery, except that service by U.S. Mail is deemed effective on the second working day after deposit for delivery. Notice for each party must be given as follows:
City:
Public Works Department
10300 Torre Ave Address
Cupertino, CA 95014 City/State/Zip
408-777-3245 Phone
Attn: Jo Anne Johnson Contact name
[email protected] Contact email address
Copy to: PW Invoices CC Contact name
125
CC 03-18-2025
125 of 541
Attachment A – Draft Contract
[email protected] CC Contact email address
Contractor:
Doolittle Construction, LLC Name
16 Business Parkway, Suite 105 Address
Sacramento, CA 95828 City/State/Zip
775-697-7232 Phone
Attn: Marc Thoreson Contact name
[email protected] Contact email address
Copy to: CC Contact name
CC Contact email address
12. General Provisions.
12.1 Assignment and Successors. Contractor may not assign its rights or obligations under this Contract, in part or in whole, without City’s written consent. This Contract is binding on Contractor’s and City’s lawful heirs, successors and permitted assigns.
12.2 Third Party Beneficiaries. There are no intended third-party beneficiaries to this Contract.
12.3 Governing Law and Venue. This Contract will be governed by California law and venue will be in the Santa Clara County Superior Court, and no other place.
Contractor waives any right it may have pursuant to Code of Civil Procedure § 394, to file a motion to transfer any action arising from or relating to this Contract to a venue outside of Santa Clara County, California.
12.4 Amendment. No amendment or modification of this Contract will be binding unless it is in a writing duly authorized and signed by the parties to this Contract.
12.5 Integration. This Contract and the Contract Documents incorporated herein, including authorized amendments or Change Orders thereto, constitute the final, complete, and exclusive terms of the agreement between City and Contractor.
12.6 Severability. If any provision of the Contract Documents is determined to be illegal, invalid, or unenforceable, in whole or in part, the remaining provisions of the Contract Documents will remain in full force and effect.
12.7 Iran Contracting Act. If the Contract Price exceeds $1,000,000, Contractor certifies, by signing below, that it is not identified on a list created under the Iran Contracting Act, Public Contract Code § 2200 et seq. (the “Act”), as a person engaging in investment activities in Iran, as defined in the Act, or is otherwise expressly exempt under the Act.
12.8 Authorization. Each individual signing below warrants that he or she is authorized to do so by the party that he or she represents, and that this Contract is legally binding on that party. If Contractor is a corporation, signatures from two officers of the corporation are required pursuant to California Corporations Code § 313.
[Signatures are on the following page.]
126
CC 03-18-2025
126 of 541
Attachment A – Draft Contract
The parties agree to this Contract as witnessed by the signatures below:
CITY:
s/_______________________________
Pamela Wu, City Manager
Name, Title
Date: ___________________________
Approved as to form:
s/__________________________________
Floy Andrews, Interim City Attorney
Name, Title
Da
te: ______________________________
Attest:
s/_______________________________
Kirsten Squarcia, City Clerk
Name, Title
Date: ___________________________
CONTRACTOR: Doolittle Construction LLC
Business Name
s/_______________________________ Seal:
_________________________________
Name, Title
Date: ____________________________
Second Signature (See Section 12.8):
s/_______________________________
_________________________________
Name, Title
Date: ____________________________
___________________________________________________
Contractor’s California License Number(s) and Expiration Date(s)
END OF CONTRACT
127
CC 03-18-2025
127 of 541
Attachment B - Project Street List
STREET NAME FROM TO TREATMENT
ALDERBROOK WY ALDERBROOK END CRACK SEAL / SLURRY SEAL
ANTOINETTE DR CLAY CLIFDEN CRACK SEAL / SLURRY SEAL
AUBURN CT AUBURN END CRACK SEAL / SLURRY SEAL
AUBURN DR PORTAL END CRACK SEAL / SLURRY SEAL
AVOCADO PL BIXBY END CRACK SEAL / SLURRY SEAL
BARNHART AVE WUNDERLICH JOHNSON CRACK SEAL / SLURRY SEAL
BARNHART AVE JOHNSON STERLING CRACK SEAL / SLURRY SEAL
BAYWOOD CT MERRITT END CRACK SEAL / SLURRY SEAL
BAYWOOD DR MERRITT PEAR TREE CRACK SEAL / SLURRY SEAL
BIXBY DR SOUTH PORTAL COLD HARBOR CRACK SEAL / SLURRY SEAL
BLANEY AVE LUCILLE OLIVEWOOD CRACK SEAL / SLURRY SEAL
BLANEY AVE OLIVEWOOD 250' S/O OLIVEWOOD CRACK SEAL / SLURRY SEAL
BRET AVE TILSON LOREE CRACK SEAL / SLURRY SEAL
BRITTANY CT LAS ONDAS END CRACK SEAL / SLURRY SEAL
BROOKGROVE SHADYGROVE WILLOWGROVE CRACK SEAL / SLURRY SEAL
BROOKWELL DR ALDERBROOK ALDERBROOK CRACK SEAL / SLURRY SEAL
CALVERT DR TILSON MENHART CRACK SEAL / SLURRY SEAL
CEDAR TREE CT CEDAR TREE END CRACK SEAL / SLURRY SEAL
CEDAR TREE LN ORANGE TREE BLANEY CRACK SEAL / SLURRY SEAL
COLBY AVE WHEATON MERRITT CRACK SEAL / SLURRY SEAL
COLD HARBOR AVE VICKSBURG BIXBY CRACK SEAL / SLURRY SEAL
CYPRESS CT CYPRESS END CRACK SEAL / SLURRY SEAL
CYPRESS DR MERRITT END CRACK SEAL / SLURRY SEAL
DENISON AVE WHEATON MERRITT CRACK SEAL / SLURRY SEAL
DEODARA DR MERRITT END CRACK SEAL / SLURRY SEAL
FARALLONE DR JOHN PACIFICA CRACK SEAL / SLURRY SEAL
FERNGROVE DR SHADYGROVE WILLOWGROVE CRACK SEAL / SLURRY SEAL
FOREST AVE VISTA END (E) CRACK SEAL / SLURRY SEAL
HYDE AVE BOLLINGER SHADYGROVE CRACK SEAL / SLURRY SEAL
JOHN DR E ESTATES BLANEY CRACK SEAL / SLURRY SEAL
JOHNSON AVE NEWSOM WUNDERLICH CRACK SEAL / SLURRY SEAL
JUDY AVE TILSON LOREE CRACK SEAL / SLURRY SEAL
JUDY AVE LOREE STEVENS CREEK CRACK SEAL / SLURRY SEAL
LA RODA DR SUISUN END CRACK SEAL / SLURRY SEAL
LAS ONDAS CT LAS ONDAS END CRACK SEAL / SLURRY SEAL
LAS ONDAS WY SOMERSET PACIFICA CRACK SEAL / SLURRY SEAL
LAZANEO DR DE ANZA VISTA CRACK SEAL / SLURRY SEAL
LINDENBROOK DR E ESTATES BLANEY CRACK SEAL / SLURRY SEAL
LOREE AVE TANTAU STERN CRACK SEAL / SLURRY SEAL
LYNTON CT FARALLONE END CRACK SEAL / SLURRY SEAL
MC LAREN PL WHEATON END CRACK SEAL / SLURRY SEAL
MEDICUS CT STERLING END CRACK SEAL / SLURRY SEAL
MICHAEL CT CLIFDEN END CRACK SEAL / SLURRY SEAL
Project Street List 128
CC 03-18-2025
128 of 541
Attachment B - Project Street List
STREET NAME FROM TO TREATMENT
MORENGO DR TUGGLE PL END CRACK SEAL / SLURRY SEAL
MURIEL LN TANTAU END CRACK SEAL / SLURRY SEAL
NORMANDY CT SOMERSET END CRACK SEAL / SLURRY SEAL
ORANGE TREE LN MERRITT CEDAR TREE CRACK SEAL / SLURRY SEAL
PACIFICA DR FARRALONE TORRE CRACK SEAL / SLURRY SEAL
RUNO CT STERLING END CRACK SEAL / SLURRY SEAL
SHADYGROVE CT SHADYGROVE END CRACK SEAL / SLURRY SEAL
SOMERSET CT SOMERSET END CRACK SEAL / SLURRY SEAL
SOMERSET DR FARALLONE LAS ONDAS CRACK SEAL / SLURRY SEAL
SOMERSET DR LAS ONDAS BLANEY CRACK SEAL / SLURRY SEAL
STERLING BLVD CYNTHIA AV BARNHART AV CRACK SEAL / SLURRY SEAL
STERLING BLVD BARNHART AV RUNO CRACK SEAL / SLURRY SEAL
SUTTON PARK PL TANTAU END CRACK SEAL / SLURRY SEAL
TONI CT FOREST END CRACK SEAL / SLURRY SEAL
TWILIGHT CT BLANEY END CRACK SEAL / SLURRY SEAL
VICKSBURG DR COLD HARBOUR E ESTATES CRACK SEAL / SLURRY SEAL
VILLA DE ANZA LUCILLE BLANEY CRACK SEAL / SLURRY SEAL
VISTA DR STEVENS CREEK LAZANEO CRACK SEAL / SLURRY SEAL
W ESTATES DR LINDENBROOK ESTATES DR CRACK SEAL / SLURRY SEAL
WHITNEY WY PACIFICA CLAY CRACK SEAL / SLURRY SEAL
WILLOWBROOK WY LINDENBROOK END CRACK SEAL / SLURRY SEAL
WILLOWGROVE LN FERNGROVE HYDE CRACK SEAL / SLURRY SEAL
WINTERGREEN DR COLD HARBOR SOUTH PORTAL CRACK SEAL / SLURRY SEAL
ACADIA CT BEARDON END FOG SEAL
ALICIA CT ALCALDE END FOG SEAL
BLOSSOM LN FELTON END FOG SEAL
CORDOVA RD SANTA LUCIA END (BARICADE) FOG SEAL
CRESTON DR 150' N/O RIVERCREST (CITY LIMIT)END FOG SEAL
EL PRADO WY VOSS MEDINA FOG SEAL
FELTON WY KIRWIN MC CLELLAN FOG SEAL
GREENWOOD CT MILLER END (SW) FOG SEAL
GREENWOOD DR MILLER END (E) FOG SEAL
JOHN WY KIRWIN MC CLELLAN FOG SEAL
JOLLYMAN LN STELLING END FOG SEAL
KRISTA CT VOSS END FOG SEAL
LA MAR CT E ESTATES END FOG SEAL
LA MAR DR BLANEY E ESTATES FOG SEAL
LANSDALE AVE OAKVILLE LA MAR FOG SEAL
LEOLA CT GREENWOOD END FOG SEAL
LINDSAY AVE LA MAR OAKVILLE FOG SEAL
LONNA LN KIRWIN MC CLELLAN FOG SEAL
MADERA DR PHAR LAP DR END FOG SEAL
MALVERN CT LA MAR END FOG SEAL
Project Street List 129
CC 03-18-2025
129 of 541
Attachment B - Project Street List
STREET NAME FROM TO TREATMENT
MANN DR STEVENS CREEK 140' N/O STEVENS CREEK FOG SEAL
MANN DR ADRIANA PHAR LAP DR. FOG SEAL
MEDINA LN EL PRADO LOCKWOOD FOG SEAL
MERCEDES RD CORDOVA END FOG SEAL
MOLTZEN DR RUPPELL CANDLELIGHT FOG SEAL
OAKVILLE AVE GLENVIEW LA MAR FOG SEAL
ORLINE CT JOLLYMAN END FOG SEAL
PARADISE DR TERRY CHERYL FOG SEAL
POPPY DR FOOTHILL END FOG SEAL
RODRIGUES AVE WESTERN DE ANZA FOG SEAL
RUPPELL PL KINGSBURY END FOG SEAL
SALEM AVE ANTHONY FOOTHILL FOG SEAL
STANDING OAK CT VOSS END FOG SEAL
STONYDALE DR CRESTON END FOG SEAL
VOSS AVE KRISTA CT END FOG SEAL
DUNBAR DR GLEN COE BEARDON FOG SEAL
DUNBAR DR BEARDON END FOG SEAL
FARGO DR BEARDON END FOG SEAL
FARGO DR GLEN COE BEARDON FOG SEAL
GLEN COE DR ELENDA HANFORD FOG SEAL
GLEN COE DR FARGO GREENLEAF FOG SEAL
HANFORD DR BEARDON END FOG SEAL
HANFORD DR GLEN COE BEARDON FOG SEAL
BLACK OAK WY SYCAMORE DR END FOG SEAL
SYCAMORE DR OAK VALLEY GATE FOG SEAL
JUNIPER CT OAK VALLEY RD END FOG SEAL
ELENDA DR GLEN COE End FOG SEAL
E ESTATES DR JOHN DR ESTATES DR FOG SEAL
DEGAS CT MEDINA END FOG SEAL
DRAKE CT DRAKE END FOG SEAL
DRAKE DR PORTAL AUBURN FOG SEAL
GRAPNEL PL AMULET END FOG SEAL
PEBBLE PL AMULET END FOG SEAL
PORTAL AVE STEVENS CREEK END (N) FOG SEAL
Project Street List 130
CC 03-18-2025
130 of 541
39 38 Thursday
37 0
Thursday
34 POPP DR
5AlEM AVE
32 Wednesday
33 Thursday
30 7
Monday
49 Frid y
1 31
12 @ Tuesday
14 11
4 3
10 6
5 13
Tuesday
29 F iday
28 ACADIA CT
r��r--D:��B�AR�D�R�-
1 "'
8 .__F,.;AR,_G
_O
,:;:
DR�-
1 HANFORD DR
I "' I z o �"'
l9 8 ELENDA
DR
1 15
Thursda
RODRIGUES AVE
OSSO
3 � � LN
� z z
g Q g �
LAZANEO DR
CEDAR
TREE LN
'wJ
Wedne
FOREST
�'
17 AVE
�TW
2 � tAS I
l:c t;I ONDAS CT
:li Sffl'l'l'llsET tu DR
PACIFICA 0 i'b, D V,
s: "' it 0
z w
I- z "' w - 9 0 :r:
� gl
s: �
@ 15
�
� 8 5 "" ,"'
LYNTON � b
0 - "'
5 �1111 11
,.........L---j rrEJ I 111 111 il
9 MOLTZEN
DR :::l
g, 0.
8 :c-�
�I Ill IIIIIIU
I 111 11111111 11111 I I II . WJJJ���1�1111 11111111111 <-.J_J_IIIII 11))11111111 �111111111111 �11111111
I
111111111
I
25 riday
w 2
day a:; w � � >
® .., "" z "' >- 0 0 <D �
8 -
LIGHT CT z w 0
I
BIXBY DR
Tuesday
19 j
<::,'le
a§Eill 111 11 IIIIIIRH+H I�&! :1111111111111� RrnTR
II ffi��l 111 11 111111 �M�
L__R;rrn�III I Ill llllllffiffiH§IIIIIIII§
24 21
I w w
a:; > 0 w "'
<.'.)
"' 0
@
0 "' <D
rm
"'
0 w> 0 "'
CJ
z "' w "-
23 MURIE LN
SUTTON
PARK PL
111111111
111111111
�->- OREE AV
22 '" 1:
PROJECT LOCATION MAP
Slurry Seal
- M-F 8:00 AM to 5:00 PM
-. M-F 9:30 AM to 2:00 PM
- <all other values>
Fog Seal
- M-F 8 AM - 5:00 PM
- M-F 9:30 AM - 2:00 PM
- <all other values>
Schools
@ Schools
Pavement
Management Grid
c::J Pavement Management
Grid
Garbage Schedule
c::J Friday
1111 Monday
c::J Thursday
c::J Tuesday
� Wednesday
Parcels
c::J Parcels
- Possible staging area to be used at
contractor's own risk
□
•
11111 I 111
131
CC 03-18-2025
131 of 541
2025 Slurry Seal / Fog Seal Project PROJECT INFORMATION Project # 2025-102 Page 1
PUBLIC WORKS DEPARTMENT • 10300 TORRE AVENUE • CUPERTINO, CALIFORNIA 95014
PROJECT MANUAL
FOR THE
2025 Slurry Seal / Fog Seal Project
Bid Dates:
Bid Package posted: Tuesday, January 28
RFI’s due date: Wednesday, February 12, 2pm
Submittals due: Wednesday, February 19, 2pm
APPROVED BY:
_______________________________________
Chad Mosley, PE,
Director of Public Works & City Engineer
132
CC 03-18-2025
132 of 541
2025 Slurry Seal / Fog Seal Project PROJECT INFORMATION Project # 2025-102 Page 2
PROJECT INFORMATION:
Location: City of Cupertino, Various City Streets
Project Overview: Slurry Seal, Fog Seal, Crack Seal, Traffic Striping and Markings .
PROJECT DIRECTORY
City Representative: City of Cupertino
*Use this Address for Stop Notices
Jo Anne Johnson
Project Manager
City of Cupertino - Public Works
10300 Torre Avenue
Cupertino, CA 95014
PH: (408) 777-3354
Email: [email protected]
133
CC 03-18-2025
133 of 541
2025 Slurry Seal / Fog Seal Project TABLE OF CONTENTS
Project # 2025-102 Page i
TABLE OF CONTENTS
Notice Inviting Bids ....................................................................................................................... 1 Instructions to Bidders ................................................................................................................. 3 Bid Proposal ................................................................................................................................... 9 Bid Schedule ................................................................................................................................ 12 Subcontractor List ....................................................................................................................... 14 Noncollusion Declaration ........................................................................................................... 16 Bid Bond ....................................................................................................................................... 17 Bidder’s Questionnaire ............................................................................................................... 19 Contract ........................................................................................................................................ 26 Payment Bond .............................................................................................................................. 32 Performance Bond ...................................................................................................................... 34 General Conditions ..................................................................................................................... 36 Article 1 - Definitions ................................................................................................................... 36 Definitions .................................................................................................................................. 36 Article 2 - Roles and Responsibilities ....................................................................................... 39
2.1 City ................................................................................................................................ 39
2.2 Contractor ...................................................................................................................... 39
2.3 Subcontractors .............................................................................................................. 42
2.4 Coordination of Work ..................................................................................................... 43
2.5 Submittals ...................................................................................................................... 43
2.6 Shop Drawings .............................................................................................................. 44 Article 3 - Contract Documents .................................................................................................. 45
3.1 Interpretation of Contract Documents ........................................................................... 45
3.2 Order of Precedence ..................................................................................................... 45
3.3 Caltrans Standard Specifications .................................................................................. 46
3.4 For Reference Only ....................................................................................................... 46
3.5 Current Versions ........................................................................................................... 47
3.6 Conformed Copies ........................................................................................................ 47 Article 4 - Bonds, Indemnity, and Insurance ............................................................................ 47
4.1 Payment and Performance Bonds ................................................................................ 47
4.2 Indemnity ....................................................................................................................... 47
4.3 Insurance ....................................................................................................................... 48 Article 5 - Contract Time ............................................................................................................. 50
5.1 Time is of the Essence .................................................................................................. 50
5.2 Schedule Requirements ................................................................................................ 50
5.3 Delay and Extensions of Contract Time ........................................................................ 52
5.4 Liquidated Damages ..................................................................................................... 55 Article 6 - Contract Modification ................................................................................................ 56
6.1 Contract Modification. .................................................................................................... 56
6.2 Contractor Change Order Requests ............................................................................. 57
6.3 Adjustments to Contract Price ....................................................................................... 58
6.4 Unilateral Change Order ............................................................................................... 58
6.5 Non-Compliance Deemed Waiver ................................................................................. 59 Article 7 - General Construction Provisions ............................................................................. 59
7.1 Permits, Fees, Business License, and Taxes ............................................................... 59
7.2 Temporary Facilities ...................................................................................................... 59
7.3 Noninterference and Site Management ........................................................................ 59
7.4 Signs .............................................................................................................................. 60
7.5 Project Site and Nearby Property Protections............................................................... 60
7.6 Materials and Equipment ............................................................................................... 61 134
CC 03-18-2025
134 of 541
2025 Slurry Seal / Fog Seal Project TABLE OF CONTENTS
Project # 2025-102 Page ii
7.7 Substitutions .................................................................................................................. 63
7.8 Testing and Inspection .................................................................................................. 63
7.9 Project Site Conditions and Maintenance ..................................................................... 65
7.10 Instructions and Manuals .............................................................................................. 66
7.11 As-built Drawings .......................................................................................................... 67
7.12 Existing Utilities ............................................................................................................. 67
7.13 Notice of Excavation ...................................................................................................... 68
7.14 Trenching and Excavations of Four Feet or More ......................................................... 68
7.15 Trenching of Five Feet or More ..................................................................................... 68
7.16 New Utility Connections ................................................................................................ 68
7.17 Lines and Grades. ......................................................................................................... 69
7.18 Historic or Archeological Items ...................................................................................... 69
7.19 Environmental Control ................................................................................................... 69
7.20 Noise Control. ................................................................................................................ 69
7.21 Mined Materials. ............................................................................................................ 69 Article 8 - Payment ...................................................................................................................... 70
8.1 Schedule of Values ....................................................................................................... 70
8.2 Progress Payments. Following the last day of each month, or as otherwise required by the Special Conditions or Specifications, Contractor will submit to the Project Manager for approval, a monthly application for payment for Work performed during the preceding month based on the estimated value of the Design Services or Construction Services performed during that preceding month. .................................................................................................... 70
8.3 Adjustment of Payment Application .............................................................................. 71
8.4 Early Occupancy. .......................................................................................................... 72
8.5 Retention ....................................................................................................................... 72
8.6 Payment to Subcontractors and Suppliers .................................................................... 72
8.7 Final Payment ............................................................................................................... 73
8.8 Release of Claims ......................................................................................................... 73
8.9 Warranty of Title ............................................................................................................ 73 Article 9 - Labor Provisions ........................................................................................................ 73
9.1 Discrimination Prohibited ............................................................................................... 73
9.2 Labor Code Requirements ............................................................................................ 73
9.3 Prevailing Wages .......................................................................................................... 74
9.4 Payroll Records ............................................................................................................. 74
9.5 Labor Compliance ......................................................................................................... 75 Article 10 - Safety Provisions ..................................................................................................... 75
10.1 Safety Precautions and Programs ................................................................................ 75
10.2 Hazardous Materials ..................................................................................................... 76
10.3 Material Safety .............................................................................................................. 76
10.4 Hazardous Condition ..................................................................................................... 76
10.5 Emergencies ................................................................................................................. 76 Article 11 - Completion and Warranty Provisions .................................................................... 76
11.1 Final Completion ........................................................................................................... 76
11.2 Warranty ........................................................................................................................ 77
11.3 Use Prior to Final Completion ....................................................................................... 78
11.4 Substantial Completion ................................................................................................. 79 Article 12 - Dispute Resolution .................................................................................................. 79
12.1 Claims ............................................................................................................................ 79
12.2 Claims Submission ........................................................................................................ 79
12.3 City’s Response ............................................................................................................ 81
12.4 Meet and Confer ............................................................................................................ 81
12.5 Mediation and Government Code Claims ..................................................................... 82
12.6 Tort Claims .................................................................................................................... 82
12.7 Arbitration ...................................................................................................................... 82
12.8 Burden of Proof and Limitations .................................................................................... 82 135
CC 03-18-2025
135 of 541
2025 Slurry Seal / Fog Seal Project TABLE OF CONTENTS
Project # 2025-102 Page iii
12.9 Legal Proceedings ......................................................................................................... 83
12.10 Other Disputes .............................................................................................................. 83 Article 13 - Suspension and Termination .................................................................................. 83
13.1 Suspension for Cause ................................................................................................... 83
13.2 Suspension for Convenience ........................................................................................ 84
13.3 Termination for Default .................................................................................................. 84
13.4 Termination for Convenience ........................................................................................ 85
13.5 Actions Upon Termination for Default or Convenience ................................................. 86 Article 14 - Miscellaneous Provisions ....................................................................................... 87
14.1 Assignment of Unfair Business Practice Claims ........................................................... 87
14.2 Provisions Deemed Inserted ......................................................................................... 87
14.3 Waiver ........................................................................................................................... 87
14.4 Titles, Headings, and Groupings ................................................................................... 87
14.5 Statutory and Regulatory References ........................................................................... 87
14.6 Survival. ......................................................................................................................... 87 Special Conditions ...................................................................................................................... 88 Technical Specifications……………………………………………………………………………….95 Caltrans Standard Detail……………………………………………………………………...………113 Estimated Quantities…………………………………………………………………………………..127 Location Map……………………………………………………………………………………………137
Truck Traffic Restrictions Map………………………………………………………………………138 Cupertino Unified School District Calendar………………………………………………………139 Attachment A - Authorized Lane Closure Hours…………………………………………………141
136
CC 03-18-2025
136 of 541
2025 Slurry Seal / Fog Seal Project TABLE OF CONTENTS
Project # 2025-102 Page iv
137
CC 03-18-2025
137 of 541
138
CC 03-18-2025
138 of 541
139
CC 03-18-2025
139 of 541
2025 Slurry Seal / Fog Seal Project INSTRUCTIONS TO BIDDERS Project # 2025-102 Page 3
Instructions to Bidders
Each Bid Proposal submitted to the City of Cupertino (“City”) for its 2025 Slurry Seal / Fog Seal Project (“Project”) must be submitted in accordance with the following instructions and requirements:
1. Bid Submission.
1.1 General. Each Bid Proposal must be completed, using the form provided in the Contract Documents, signed, and submitted to City in a sealed envelope, with all required forms and attachments, by or before the date and time set forth in Section 1 of the Notice Inviting Bids, or as amended by subsequent addendum. Faxed or emailed Bid Proposals will not be accepted, unless otherwise specified. Late submissions will be returned unopened. City reserves the right to postpone the date or time for receiving or opening bids. Each bidder is solely responsible for all of its costs to prepare and submit its bid and by submitting a bid waives any right to recover those costs from City. The bid price(s) must include all costs to perform the Work as specified, including all labor, material, supplies, and equipment and all other direct or indirect costs such as applicable taxes, insurance and overhead.
1.2 Electronic Submission. The Bid Proposal and all required forms and attachments must be submitted in PDF format on the City’s “Business Opportunities” portal at https://apps.cupertino.gov/bidManagement/index.aspx. To submit a bid, (1) select the folder icon in the “Actions” column for the Project; (2) select the “Electronic Submission” tab; (3) when the log-in screen appears, enter the log-in credentials used to access the Contract Documents and/or create an account, as appropriate; (4) after logging in, carefully follow all instructions for electronic submission of the Bid Proposal and all required forms and attachments. Each bidder should familiarize itself with the City’s “Business Opportunities” portal before the bid deadline. Electronic submission may take more time than anticipated. Each bidder should plan accordingly and afford itself ample time to upload its bid. Bids that are in the process of uploading but are not completely uploaded by the bid deadline will be automatically rejected by the portal. The portal will not allow submission after the bid deadline.
1.3 Bid Posting. The amount of each bid and such other relevant information as the City deems appropriate, together with the name of each bidder, shall be posted on the City website https://apps.cupertino.gov/bidManagement/index.aspx on the first working day following a period of 48 hours after the bid opening and remain open to public inspection for a period of not less than fifteen (15) calendar days after the bid opening.
1.3 DIR Registration. Subject to limited legal exceptions for joint venture bids and federally-funded projects, City may not accept a Bid Proposal from a bidder without proof that the bidder is registered with the DIR to perform public work under Labor Code § 1725.5. If City is unable to confirm that the bidder is currently registered with the DIR, City may disqualify the bidder and return its bid unopened. (Labor Code §§ 1725.5 and 1771.1(a).)
2. Bid Proposal Form and Enclosures. Each Bid Proposal must be completed legibly using the Bid Proposal form included with the Contract Documents. The Bid Proposal form must be fully completed without interlineations, alterations, or erasures. Any necessary corrections must be clear and legible and must be initialed by the bidder’s authorized 140
CC 03-18-2025
140 of 541
2025 Slurry Seal / Fog Seal Project INSTRUCTIONS TO BIDDERS Project # 2025-102 Page 4
representative. A Bid Proposal submitted with exceptions or terms such as “negotiable,” “will negotiate,” or similar, will be considered nonresponsive. Each Bid Proposal must be accompanied by bid security, as set forth in Section 4 below, and by a completed Subcontractor List and Non-Collusion Declaration using the forms included with the Contract Documents, and any other required enclosures, as applicable.
3. Authorization and Execution. Each Bid Proposal must be signed by the bidder’s authorized representative. A Bid Proposal submitted by a partnership must be signed in the partnership name by a general partner with authority to bind the partnership. A Bid Proposal submitted by a corporation must be signed with the legal name of the corporation, followed by the signature and title of two officers of the corporation with full authority to bind the corporation to the terms of the Bid Proposal, under California Corporations Code § 313.
4. Bid Security. Each Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier’s check or certified check, made payable to the City, or bid bond using the form included in the Contract Documents and executed by a surety licensed to do business in the State of California.
4.1 Form of Security and Submission. In addition to submitting a PDF copy of the bid security, the wet-inked original bid bond, cashier’s or certified check, must be sent to the City via U.S. Mail or a reliable overnight delivery service in a sealed envelope addressed to City of Cupertino, Office of the City Clerk, 10300 Torre Avenue, Cupertino, CA 95014 and clearly labeled with the bidder’s legal name and address, the Project title, and date and time of the bid deadline. The envelope containing the original form of bid security must be postmarked or otherwise dated to show that it was submitted to the United States Postal Service or overnight delivery service by or before the date of the bid deadline.
4.2 Bid Guarantee. The bid security must guarantee that, within ten days after issuance of the Notice of Potential Award, the bidder will: execute and submit the enclosed Contract for the bid price; submit payment and performance bonds for 100% of the maximum Contract Price; submit the insurance certificates and endorsements; and submit valid Certificates of Reported Compliance as required by the Off-Road Regulation, if applicable, and any other submittals, if any, required by the Contract Documents or the Notice of Potential Award. A Bid Proposal may not be withdrawn for a period of 60 days after the bid opening without forfeiture of the bid security, except as authorized for material error under Public Contract Code § 5100 et seq.
5. Requests for Information. Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to Jo Anne Johnson, Project Manager, at [email protected] with the following text in the subject line “2025 Slurry Seal/Fog Seal Project”. Oral responses are not authorized and are not binding on the City. Bidders should submit any such written inquiries at least five Working Days before the scheduled bid opening. Questions received later may not be addressed before the bid deadline. An interpretation or clarification by City in response to a written inquiry will be issued in an addendum.
6. Pre-Bid Investigation.
6.1 General. Each bidder is solely responsible at its sole expense for diligent and thorough review of the Contract Documents, examination of the Project site, and reasonable and prudent inquiry concerning known and potential site and area conditions prior to submitting a Bid Proposal. Each bidder is responsible for knowledge of conditions and requirements which reasonable review and 141
CC 03-18-2025
141 of 541
2025 Slurry Seal / Fog Seal Project INSTRUCTIONS TO BIDDERS Project # 2025-102 Page 5
investigation would have disclosed. However, except for any areas that are open to the public at large, bidders may not enter property owned or leased by the City or the Project site without prior written authorization from City.
6.2 Document Review. Each bidder is responsible for review of the Contract Documents and any informational documents provided “For Reference Only,” e.g., as-builts, technical reports, test data, and the like. A bidder is responsible for notifying City of any errors, omissions, inconsistencies, or conflicts it discovers in the Contract Documents, acting solely in its capacity as a contractor and subject to the limitations of Public Contract Code § 1104. Notification of any such errors, omissions, inconsistencies, or conflicts must be submitted in writing to the City no later than five Working Days before the scheduled bid opening. (See Section 5, above.) City expressly disclaims responsibility for assumptions a bidder might draw from the presence or absence of information provided by City.
6.3 Project Site. Questions regarding the availability of soil test data, water table elevations, and the like should be submitted to the City in writing, as specified in Section 5, above. Any subsurface exploration at the Project site must be done at the bidder’s expense, but only with prior written authorization from City. All soil data and analyses available for inspection or provided in the Contract Documents apply only to the test hole locations. Any water table elevation indicated by a soil test report existed on the date the test hole was drilled. The bidder is responsible for determining and allowing for any differing soil or water table conditions during construction. Because groundwater levels may fluctuate, difference(s) in elevation between ground water shown in soil boring logs and ground water actually encountered during construction will not be considered changed Project site conditions. Actual locations and depths must be determined by bidder’s field investigation. The bidder may request access to underlying or background information on the Project site in City’s possession that is necessary for the bidder to form its own conclusions, including, if available, record drawings or other documents indicating the location of subsurface lines, utilities, or other structures.
6.4 Utility Company Standards. The Project must be completed in a manner that satisfies the standards and requirements of any affected utility companies or agencies (collectively, “utility owners”). The successful bidder may be required by the third-party utility owners to provide detailed plans prepared by a California registered civil engineer showing the necessary temporary support of the utilities during coordinated construction work. Bidders are directed to contact the affected third-party utility owners about their requirements before submitting a Bid Proposal.
7. Bidders Interested in More Than One Bid. No person, firm, or corporation may submit or be a party to more than one Bid Proposal unless alternate bids are specifically called for.
However, a person, firm, or corporation that has submitted a subcontract proposal or quote to a bidder may submit subcontract proposals or quotes to other bidders.
8. Addenda. Subject to the limitations of Public Contract Code § 4104.5, City reserves the right to issue addenda prior to bid time. Any addenda issued prior to the bid opening are part of the Contract Documents. Each bidder is solely responsible for ensuring it has received and reviewed all addenda prior to submitting its bid. Bidders should check City’s website periodically for any addenda or updates on the Project at:
https://apps.cupertino.gov/bidManagement/index.aspx.
9. Brand Designations and “Or Equal” Substitutions. Any specification designating a material, product, thing, or service by specific brand or trade name, followed by the words “or equal,” is intended only to indicate quality and type of item desired, and bidders may 142
CC 03-18-2025
142 of 541
2025 Slurry Seal / Fog Seal Project INSTRUCTIONS TO BIDDERS Project # 2025-102 Page 6
request use of any equal material, product, thing, or service. All data substantiating the proposed substitute as an equal item must be submitted with the written request for substitution. A request for substitution must be submitted within 35 days after Notice of Potential Award unless otherwise provided in the Contract Documents. This provision does not apply to materials, products, things, or services that may lawfully be designated by a specific brand or trade name under Public Contract Code § 3400(c).
10. Bid Protest. Any bid protest against another bidder must be submitted in writing and received by City at 10300 Torre Ave, Cupertino, CA 95014 Attn: City Clerk or sent via email at [email protected] before 5:00 p.m. no later than two Working Days following bid opening (“Bid Protest Deadline”) and must comply with the following requirements:
10.1 General. Only a bidder who has actually submitted a Bid Proposal is eligible to submit a bid protest against another bidder. Subcontractors are not eligible to submit bid protests. A bidder may not rely on the bid protest submitted by another bidder but must timely pursue its own protest. For purposes of this Section 10, a “Working Day” means a day that City is open for normal business, and excludes weekends and holidays observed by City. Pursuant to Public Contract Code § 4104, inadvertent omission of a Subcontractor’s DIR registration number on the Subcontractor List form is not grounds for a bid protest, provided it is corrected within 24 hours of the bid opening or as otherwise provided under Labor Code § 1771.1(b).
10.2 Protest Contents. The bid protest must contain a complete statement of the basis for the protest and must include all supporting documentation. Material submitted after the Bid Protest Deadline will not be considered. The protest must refer to the specific portion or portions of the Contract Documents upon which the protest is based. The protest must include the name, address, email address, and telephone number of the protesting bidder and any person submitting the protest on behalf of or as an authorized representative of the protesting bidder.
10.3 Copy to Protested Bidder. Upon submission of its bid protest to City, the protesting bidder must also concurrently transmit the protest and all supporting documents to the protested bidder, and to any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest, by email or hand delivery to ensure delivery before the Bid Protest Deadline.
10.4 Response to Protest. The protested bidder may submit a written response to the protest, provided the response is received by City before 5:00 p.m., within two Working Days after the Bid Protest Deadline or after actual receipt of the bid protest, whichever is sooner (the “Response Deadline”). The response must attach all supporting documentation. Material submitted after the Response Deadline will not be considered. The response must include the name, address, email address, and telephone number of the person responding on behalf of or representing the protested bidder if different from the protested bidder.
10.5 Copy to Protesting Bidder. Upon submission of its response to the bid protest to the City, the protested bidder must also concurrently transmit by email or hand delivery, by or before the Response Deadline, a copy of its response and all supporting documents to the protesting bidder and to any other bidder who has a reasonable prospect of receiving an award depending upon the outcome of the protest.
10.6 Exclusive Remedy. The procedure and time limits set forth in this Section are mandatory and are the bidder’s sole and exclusive remedy in the event of a bid 143
CC 03-18-2025
143 of 541
2025 Slurry Seal / Fog Seal Project INSTRUCTIONS TO BIDDERS Project # 2025-102 Page 7
protest. A bidder’s failure to comply with these procedures will constitute a waiver of any right to further pursue a bid protest, including filing a Government Code Claim or initiation of legal proceedings.
10.7 Right to Award. City reserves the right, acting in its sole discretion, to reject any bid protest that it determines lacks merit; to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a Notice to Proceed with the Work notwithstanding any pending or continuing challenge to its determination.
11. Reservation of Rights. City reserves the unfettered right, acting in its sole discretion, to waive or to decline to waive any immaterial bid irregularities; to accept or reject any or all bids; to cancel or reschedule the bid; to postpone or abandon the Project entirely; or to perform all or part of the Work with its own forces. The Contract will be awarded, if at all, within 60 days after opening of bids or as otherwise specified in the Special Conditions, to the responsible bidder that submitted the lowest responsive bid. Any planned start date for the Project represents the City’s expectations at the time the Notice Inviting Bids was first issued. City is not bound to issue a Notice to Proceed by or before such planned start date, and it reserves the right to issue the Notice to Proceed when the City determines, in its sole discretion, the appropriate time for commencing the Work. The City expressly disclaims responsibility for any assumptions a bidder might draw from the presence or absence of information provided by the City in any form. Each bidder is solely responsible for its costs to prepare and submit a bid, including site investigation costs.
12. Bonds. Within ten calendar days following City’s issuance of the Notice of Potential Award to the successful bidder, the bidder must submit payment and performance bonds to City as specified in the Contract Documents using the bond forms included in the Contract Documents. All required bonds must be calculated on the maximum total Contract Price as awarded, including additive alternates, if applicable.
13. License(s). The successful bidder and its Subcontractor(s) must possess the California contractor’s license(s) in the classification(s) required by law to perform the Work. The successful bidder must also obtain a City business license within 10 days following City’s issuance of the Notice of Potential Award. Subcontractors must also obtain a City business license before performing any Work.
14. Ineligible Subcontractor. Any Subcontractor who is ineligible to perform work on a public works project under Labor Code §§ 1777.1 or 1777.7 is prohibited from performing work on the Project.
15. Safety Orders. If the Project includes construction of a pipeline, sewer, sewage disposal system, boring and jacking pits, or similar trenches or open excavations, which are five feet or deeper, each bid must include a bid item for adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life or limb, which comply with safety orders as required by Labor Code § 6707.
16. In-Use Off-Road Diesel-Fueled Fleets. If the Project involves the use of vehicles subject to the California Air Resources Board’s In-Use Off-Road Diesel-Fueled Fleets Regulation (13 CCR § 2449 et seq.) (“Off-Road Regulation”), then within ten calendar days following City’s issuance of the Notice of Potential Award to the successful bidder, the bidder must submit to City valid Certificates of Reported Compliance for its fleet and its listed Subcontractors, if applicable, in accordance with the Off-Road Regulation, unless exempt under the Off-Road Regulation.
144
CC 03-18-2025
144 of 541
2025 Slurry Seal / Fog Seal Project INSTRUCTIONS TO BIDDERS Project # 2025-102 Page 8
17. Bid Schedule. Each bidder must complete the Bid Schedule form with unit prices as indicated, and submit the completed Bid Schedule with its Bid Proposal.
17.1 Incorrect Totals. In the event a computational error for any bid item (base bid or alternate) results in an incorrect extended total for that item, the submitted base bid or bid alternate total will be adjusted to reflect the corrected amount as the product of the estimated quantity and the unit cost. In the event of a discrepancy between the actual total of the itemized or unit prices shown on the Bid Schedule for the base bid, and the amount entered as the base bid on the Bid Proposal form, the actual total of the itemized or unit prices shown on the Bid Schedule for the base bid will be deemed the base bid price. Likewise, in the event of a discrepancy between the actual total of the itemized or unit prices shown on the Bid Schedule for any bid alternate, and the amount entered for the alternate on the Bid Proposal form, the actual total of the itemized prices shown on the Bid Schedule for that alternate will be deemed the alternate price. Nothing in this provision is intended to prevent a bidder from requesting to withdraw its bid for material error under Public Contract Code § 5100 et seq.
17.2 Estimated Quantities. Unless identified as a “Final Pay Quantity,” the quantities shown on the Bid Schedule are estimated and the actual quantities required to perform the Work may be greater or less than the estimated amount. The Contract Price will be adjusted to reflect the actual quantities required for the Work based on the itemized or unit prices provided in the Bid Schedule, with no allowance for anticipated profit for quantities that are deleted or decreased, and no increase in the unit price, and without regard to the percentage increase or decrease of the estimated quantity and the actual quantity.
18. Bidder’s Questionnaire. A completed, signed Bidder’s Questionnaire using the form provided with the Contract Documents and including all required attachments must be submitted within 48 hours following a request by City. A bid that does not fully comply with this requirement may be rejected as nonresponsive. A bidder who submits a Bidder’s Questionnaire which is subsequently determined to contain false or misleading information, or material omissions, may be disqualified as non-responsible.
END OF INSTRUCTIONS TO BIDDERS
145
CC 03-18-2025
145 of 541
2025 Slurry Seal / Fog Seal Project BID PROPOSAL
Project # 2025-102 Page 9
Bid Proposal
2025 Slurry Seal / Fog Seal Project
______________________________________________________ (“Bidder”) hereby submits this Bid Proposal to the City of Cupertino (“City”) for the above-referenced project (“Project”) in response to the Notice Inviting Bids and in accordance with the Contract Documents referenced in the Notice.
1. Base Bid. Bidder proposes to perform and fully complete the Work for the Project as specified in the Contract Documents, within the time required for full completion of the Work, including all labor, materials, supplies, and equipment and all other direct or indirect costs including, but not limited to, taxes, insurance and all overhead, for the following price (“Base Bid”):
$_______________________________________________________.
2. Addenda. Bidder agrees that it has confirmed receipt of or access to, and reviewed, all addenda issued for this bid. Bidder waives any claims it might have against the City based on its failure to receive, access, or review any addenda for any reason. Bidder specifically acknowledges receipt of the following addenda:
Addendum Date Received
#1
#2
#3
#4
#5
3. Bidder’s Certifications and Warranties. By signing and submitting this Bid Proposal, Bidder certifies and warrants the following:
3.1 Examination of Contract Documents. Bidder has thoroughly examined the Contract Documents and represents that, to the best of Bidder’s knowledge, there are no errors, omissions, or discrepancies in the Contract Documents, subject to the limitations of Public Contract Code § 1104.
3.2 Examination of Worksite. Bidder has had the opportunity to examine the Worksite and local conditions at the Project location.
3.3 Bidder Responsibility. Bidder is a responsible bidder, with the necessary ability, capacity, experience, skill, qualifications, workforce, equipment, and resources to perform or cause the Work to be performed in accordance with the Contract Documents and within the Contract Time.
3.4 Responsibility for Bid. Bidder has carefully reviewed this Bid Proposal and is solely responsible for any errors or omissions contained in its completed bid. All statements and information provided in this Bid Proposal and enclosures are true and correct to the best of Bidder’s knowledge.
3.5 Nondiscrimination. In preparing this bid, the Bidder has not engaged in discrimination against any prospective or present employee or Subcontractor on grounds of race, color, ancestry, national origin, ethnicity, religion, sex, sexual orientation, age, disability, or marital status.
146
CC 03-18-2025
146 of 541
2025 Slurry Seal / Fog Seal Project BID PROPOSAL
Project # 2025-102 Page 10
3.6 Iran Contracting Act. If the Contract Price exceeds $1,000,000, Bidder is not identified on a list created under the Iran Contracting Act, Public Contract Code § 2200 et seq. (the “Act”), as a person engaging in investment activities in Iran, as defined in the Act, or is otherwise expressly exempt under the Act.
4. Award of Contract. By signing and submitting this Bid Proposal, Bidder agrees that, if City issues the Notice of Potential Award to Bidder, then within ten days following issuance of the Notice of Potential Award to Bidder, Bidder will do all of the following:
4.1 Execute Contract. Enter into the Contract with City in accordance with the terms of this Bid Proposal, by signing and submitting to City the Contract prepared by City using the form included with the Contract Documents;
4.2 Submit Required Bonds. Submit to City a payment bond and a performance bond, each for 100% of the Contract Price, using the bond forms provided and in accordance with the requirements of the Contract Documents;
4.3 Insurance Requirements. Submit to City the insurance certificate(s) and endorsement(s) as required by the Contract Documents; and
4.4 Certificates of Reported Compliance. Submit to City valid Certificates of Reported Compliance for its fleet and its listed Subcontractors, if applicable, if the Project involves the use of vehicles subject to the Off-Road Regulation. (See Section 16 of the Instructions to Bidders.)
5. Bid Security. As a guarantee that, if awarded the Contract, Bidder will perform its obligations under Section 4 above, Bidder is enclosing bid security in the amount of ten percent of its maximum bid amount in one of the following forms:
Check One:
A cashier’s check or certified check payable to City and issued by [bank name] ___________________________
in the amount of: $__________________
A bid bond, using the Bid Bond form included with the Contract Documents, payable to City and executed by a surety licensed to do business in the State of California.
147
CC 03-18-2025
147 of 541
2025 Slurry Seal / Fog Seal Project BID PROPOSAL
Project # 2025-102 Page 11
This Bid Proposal is hereby submitted on _________________________, 2025.
s/ ___________________________________ ______________________________________ Name and Title
s/ ___________________________________ ______________________________________ [See Section 3 of Instructions to Bidders] Name and Title
_____________________________________ ______________________________________ Company Name License #, Expiration Date, and Classification
_____________________________________ ______________________________________ Address DIR Registration #
_____________________________________ ______________________________________ City, State, Zip Phone
_____________________________________ ______________________________________ Contact Name Contact Email
END OF BID PROPOSAL
148
CC 03-18-2025
148 of 541
2025 Slurry Seal / Fog Seal Project BID SCHEDULE
Project # 2025-102 Page 12
Bid Schedule
This Bid Schedule must be completed legibly and included with the sealed Bid Proposal. Pricing must be provided for each Bid Item as indicated. Items marked “(SW)” are Specialty Work that must be performed by a qualified Subcontractor. The lump sum or unit cost for each item must be inclusive of all costs, whether direct or indirect, including profit and overhead. The sum of all amounts entered in the “Extended Total Amount” column must be identical to the Base Bid price entered in Section 1 of the Bid Proposal form.
AL = Allowance
CF = Cubic Feet
CY = Cubic Yard
EA = Each
LB = Pounds
LF = Linear Foot
LS = Lump Sum
SF = Square Feet
TON = Ton (2000 lbs)
BID
ITEM
NO.
ITEM DESCRIPTION EST. QTY. UNIT UNIT
COST
EXTENDED
TOTAL AMOUNT
1 Traffic Control 1 LS $ $
2 Crack Seal 1 LS $ $
3 Fog Seal 152,461 SY $ $
4 Type II Slurry Seal 142,240 SY $ $
5 Install Blue RPM's @ Fire
Hydrant 52 EA $ $
6 12" White Crosswalk/Limit Line
(Thermo) 1841 LF $ $
7 12" Yellow Crosswalk (Thermo) 405 LF $ $
8 24" White (Thermo) 110 LF $ $
9 24" Yellow (Thermo) 1590 LF $ $
10 Striping Detail 22 2910 LF $ $
11 Striping Detail 38 120 LF $ $
12 Arrow Type IV Left (Preformed
Thermo) 2 EA $ $
13 Arrow Type IV Right (Preformed
Thermo) 4 EA $ $
14 Arrow Type I 10' (Preformed
Thermo) 1 EA $ $
15 "25" Legend (Preformed
Thermo) 4 EA $ $
16 "Ahead Legend (Preformed) 1 EA $ $
17 "Bump" Legend (Preformed) 8 EA $ $
18 "STOP" Legend (Preformed
Thermo) 37 EA $ $
19 "SLOW SCHOOL XING"
Legend (Preformed Thermo) 4 EA $ $
20 Sharrow (Preformed Thermo) 43 EA $ $
21 "YIELD" Legend (Preformed
Thermo) 2 EA $ $
149
CC 03-18-2025
149 of 541
2025 Slurry Seal / Fog Seal Project BID SCHEDULE
Project # 2025-102 Page 13
BID
ITEM
NO.
ITEM DESCRIPTION EST. QTY. UNIT UNIT
COST
EXTENDED
TOTAL AMOUNT
22 YIELD LINE (Preformed
Thermo) 9 EA $ $
23 Green Bike Lane (Preformed) 30 SF $ $
24 Bike Rider Symbol on Green
(Preformed) 1 EA $ $
25 Bike Rider Arrow on Green
(Preformed) 1 EA $ $
26 Parking Ts (Thermo) 14 EA $ $
* Final Pay Quantity
TOTAL BASE BID: Items 1 through _____ inclusive: $_____________________________________
Note: The amount entered as the “Total Base Bid” should be identical to the Base Bid amount entered in Section 1 of the Bid Proposal form.
BIDDER NAME: ________________________________________________________________
END OF BID SCHEDULE
150
CC 03-18-2025
150 of 541
2025 Slurry Seal / Fog Seal Project SUBCONTRACTOR LIST Project # 2025-102 Page 14
Subcontractor List
For each Subcontractor that will perform a portion of the Work in an amount in excess of one-half of 1% of the Bidder’s total Base Bid,1 the bidder must list a description of the Work, the name of the Subcontractor, its California contractor license number, the location of its place of business, its DIR registration number, and the portion of the Work that the Subcontractor is performing based on a percentage of the Base Bid price.
DESCRIPTION
OF WORK
SUBCONTRACTOR
NAME
CALIFORNIA
CONTRACTOR
LICENSE NO.
LOCATION OF
BUSINESS
DIR REG. NO. PERCENT
OF
WORK
1 For street or highway construction, this requirement applies to any subcontract of $10,000 or more. 151
CC 03-18-2025
151 of 541
2025 Slurry Seal / Fog Seal Project SUBCONTRACTOR LIST Project # 2025-102 Page 15
END OF SUBCONTRACTOR LIST
152
CC 03-18-2025
152 of 541
2025 Slurry Seal / Fog Seal Project NONCOLLUSION DECLARATION Project # 2025-102 Page 16
Noncollusion Declaration
TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
The undersigned declares:
I am the __________________________ [title] of _____________________________________ [business name], the party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham.
The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
This declaration is intended to comply with California Public Contract Code § 7106 and Title 23 U.S.C § 112.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on _______________ [date], at __________________________________ [city], _______ [state].
s/________________________________________
__________________________________________
Name [print]
END OF NONCOLLUSION DECLARATION
153
CC 03-18-2025
153 of 541
2025 Slurry Seal / Fog Seal Project BID BOND
Project # 2025-102 Page 17
Bid Bond
________________________________________________________ (“Bidder”) has submitted a bid, dated ___________________________, 20______ (“Bid”), to the City of Cupertino (“City”) for work on the 2025 Slurry Seal / Fog Seal Project (“Project”). Under this duly executed bid bond (“Bid Bond”), Bidder as Principal and ______________________________, its surety (“Surety”), are bound to City as obligee in the penal sum of ten percent of the maximum amount of the Bid (the “Bond Sum”). Bidder and Surety bind themselves and their respective heirs, executors, administrators, successors and assigns, jointly and severally, as follows:
1. General. If Bidder is awarded the Contract for the Project, Bidder will enter into the Contract with City in accordance with the terms of the Bid.
2. Submittals. Within ten days following issuance of the Notice of Potential Award to Bidder, Bidder must submit to City the following:
2.1 Contract. The executed Contract, using the form provided by City in the Project contract documents (“Contract Documents”);
2.2 Payment Bond. A payment bond for 100% of the maximum Contract Price, executed by a surety licensed to do business in the State of California using the Payment Bond form included with the Contract Documents;
2.3 Performance Bond. A performance bond for 100% of the maximum Contract Price, executed by a surety licensed to do business in the State of California using the Performance Bond form included with the Contract Documents;
2.4 Insurance. The insurance certificate(s) and endorsement(s) required by the Contract Documents;
2.5 Certificates of Reported Compliance. Valid Certificates of Reported Compliance for its fleet and its listed Subcontractors, if applicable, in accordance with the In-Use Off-Road Diesel-Fueled Fleets Regulation (13 CCR § 2449 et seq.) (“Off-Road Regulation”), if the Project involves the use of vehicles subject to the Off-Road Regulation; and any other documents required by the Instructions to Bidders or Notice of Potential Award.
3. Enforcement. If Bidder fails to execute the Contract or to submit the bonds, insurance certificates, and valid Certificates of Reported Compliance as required by the Contract Documents, Surety guarantees that Bidder forfeits the Bond Sum to City. Any notice to Surety may be given in the manner specified in the Contract and delivered or transmitted to Surety as follows:
Attn: _____________________________________________________ Address: _________________________________________________ City/State/Zip: _____________________________________________ Phone: ___________________________________________________ Fax: _____________________________________________________ Email: ___________________________________________________
4. Duration and Waiver. If Bidder fulfills its obligations under Section 2, above, then this obligation will be null and void; otherwise, it will remain in full force and effect for 60 days following the bid opening or until this Bid Bond is returned to Bidder, whichever occurs first.
Surety waives the provisions of Civil Code §§ 2819 and 2845. 154
CC 03-18-2025
154 of 541
2025 Slurry Seal / Fog Seal Project BID BOND
Project # 2025-102 Page 18
This Bid Bond is entered into and effective on ___________________, 20_____.
SURETY:
___________________________________
Business Name
s/__________________________________ ______________________________ Date
___________________________________
Name, Title
(Attach Acknowledgment with Notary Seal and Power of Attorney)
BIDDER:
___________________________________
Business Name
s/__________________________________ ______________________________ Date
___________________________________
Name, Title
END OF BID BOND
155
CC 03-18-2025
155 of 541
2025 Slurry Seal / Fog Seal Project BIDDER’S QUESTIONNAIRE Project # 2025-102 Page 19
Bidder’s Questionnaire
2025 Slurry Seal / Fog Seal Project
Within 48 hours following a request by City, a bidder must submit to City a completed, signed Bidder’s Questionnaire using this form and all required attachments, including clearly labeled additional sheets as needed. City may request the Questionnaire from one or more of the apparent low bidders following the bid opening and may use the completed Questionnaire as part of its investigation to evaluate a bidder’s qualifications for this Project. The Questionnaire must be filled out completely, accurately, and legibly. Any errors, omissions, or misrepresentations in completion of the Questionnaire may be grounds for rejection of the bid or termination of a Contract awarded pursuant to the bid.
Part A: General Information
Bidder Business Name
Main Office Address and
Phone
Local Office Address and
Phone
Website Address
Owner of Business
Contact Name and Title
Contact Phone and Email
Bidder’s California
Contractor’s License
Number(s):
Bidder’s DIR Registration
Number
Check One:
Corporation - State of incorporation:
Partnership
Sole Proprietorship
Joint Venture of:
Other:
Part B: Bidder Experience
1 How many years has Bidder been in business under its present business name? (in years)
2 Has Bidder completed projects similar in type and size to this Project as a general contractor? (Yes or No)
156
CC 03-18-2025
156 of 541
2025 Slurry Seal / Fog Seal Project BIDDER’S QUESTIONNAIRE Project # 2025-102 Page 20
3 Has Bidder ever been disqualified from a bid
on grounds that it is not responsible, or
otherwise disqualified or debarred from bidding
under state or federal law? (Yes or No)
If yes, provide additional information on a
separate sheet regarding the disqualification or
debarment, including the name and address of
the agency or owner of the project, the type
and size of the project, the reasons that Bidder
was disqualified or debarred, and the month
and year in which the disqualification or
debarment occurred.
4 Has Bidder ever been terminated for cause,
alleged default, or legal violation from a
construction project, either as a general
contractor or as a subcontractor? (Yes or No)
If yes, provide additional information on a
separate sheet regarding the termination,
including the name and address of the agency
or owner of the subject project, the type and
size of the project, whether Bidder was under
contract as a general contractor or a
subcontractor, the reasons that Bidder was
terminated, and the month and year in which
the termination occurred.
Part C: Project Experience
Provide information on at least three projects, performed as general contractor, that are similar in scope and character to this project. Three of the projects must be public sector projects. (Use separate sheets if required)
157
CC 03-18-2025
157 of 541
2025 Slurry Seal / Fog Seal Project BIDDER’S QUESTIONNAIRE Project # 2025-102 Page 21
Project #1
A Project name
B Project location
C Project description:
D Client/Owner (name, address, email, and
phone number
E Prime contractor, if applicable (name,
address, email, and phone number)
F Architect or engineer (name, email, and
phone number)
G Project and/or construction manager (name,
email, and phone number)
H Scope of work performed (as general
contractor or as subcontractor)
I Initial contract price $
J Final contract price (including change
orders)
$
K Original scheduled completion date
L Actual date of completion
M Time extensions granted (number of days)
N Number and amount of stop notices or
mechanic’s liens filed
O Amount of any liquidated damages
assessed against Bidder
P Nature and resolution of any project-related
claim, lawsuit, mediation, or arbitration
involving Bidder
Q Other Notes
158
CC 03-18-2025
158 of 541
2025 Slurry Seal / Fog Seal Project BIDDER’S QUESTIONNAIRE Project # 2025-102 Page 22
Project #2
A Project name
B Project location
C Project description:
D Client/Owner (name, address, email, and
phone number
E Prime contractor, if applicable (name,
address, email, and phone number)
F Architect or engineer (name, email, and
phone number)
G Project and/or construction manager (name,
email, and phone number)
H Scope of work performed (as general
contractor or as subcontractor)
I Initial contract price $
J Final contract price (including change
orders)
$
K Original scheduled completion date
L Actual date of completion
M Time extensions granted (number of days)
N Number and amount of stop notices or
mechanic’s liens filed
O Amount of any liquidated damages
assessed against Bidder
P Nature and resolution of any project-related
claim, lawsuit, mediation, or arbitration
involving Bidder
Q Other Notes
159
CC 03-18-2025
159 of 541
2025 Slurry Seal / Fog Seal Project BIDDER’S QUESTIONNAIRE Project # 2025-102 Page 23
Project #3
A Project name
B Project location
C Project description:
D Client/Owner (name, address, email, and
phone number
E Prime contractor, if applicable (name,
address, email, and phone number)
F Architect or engineer (name, email, and
phone number)
G Project and/or construction manager (name,
email, and phone number)
H Scope of work performed (as general
contractor or as subcontractor)
I Initial contract price $
J Final contract price (including change
orders)
$
K Original scheduled completion date
L Actual date of completion
M Time extensions granted (number of days)
N Number and amount of stop notices or
mechanic’s liens filed
O Amount of any liquidated damages
assessed against Bidder
P Nature and resolution of any project-related
claim, lawsuit, mediation, or arbitration
involving Bidder
Q Other Notes
160
CC 03-18-2025
160 of 541
2025 Slurry Seal / Fog Seal Project BIDDER’S QUESTIONNAIRE Project # 2025-102 Page 24
Part D: Safety
1. Provide Bidder’s Experience Modification Rate (EMR) for the last three years:
Year EMR
2. Complete the following, based on information provided in Bidder’s CalOSHA Form 300 or Form 300A, Annual Summary of Work-Related Illnesses and Injuries, from the most recent past calendar year:
2.1 Number of lost workday cases:
2.2 Number of medical treatment cases:
2.3 Number of deaths:
3. Has Bidder ever been cited, fined, or prosecuted by any local, state, or federal agency, including OSHA, CalOSHA, or EPA, for violation of any law, regulation, or requirements pertaining to health and safety?
Yes or No?
If yes, provide additional information on a separate sheet regarding each such citation, fine, or prosecution, including the name and address of the agency or owner of the project, the type and size of the project, the reasons for and nature of the citation, fine, or prosecution, and the month and year in which the incident giving rise to the citation, fine, or prosecution occurred.
4. Name, title, and email for person responsible for Bidder’s safety program:
Name Title Email Address
Part D: Verification
In signing this document, I, the undersigned, declare that I am duly authorized to sign and submit this Bidder’s Questionnaire on behalf of the named Bidder, and that all responses and information set forth in this Bidder’s Questionnaire and accompanying attachments are, to the best of my knowledge, true, accurate and complete as of the date of submission. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct.
Signature: ______________________________ Date: ________________
By: _______________________________________________________________ Name and Title
END OF BIDDER’S QUESTIONNAIRE
161
CC 03-18-2025
161 of 541
2025 Slurry Seal / Fog Seal Project BIDDER’S QUESTIONNAIRE Project # 2025-102 Page 25
162
CC 03-18-2025
162 of 541
2025 Slurry Seal / Fog Seal Project CONTRACT
Project # 2025-102 Page 26
Contract
This public works contract (“Contract”) is entered into by and between the City of Cupertino (“City”) and _______________________________________ (“Contractor”), for work on the 2025 Slurry Seal / Fog Seal Project (“Project”).
The parties agree as follows:
1. Award of Contract. In response to the Notice Inviting Bids, Contractor has submitted a Bid Proposal to perform the Work to construct the Project. On _____________, 20___, City authorized award of this Contract to Contractor for the amount set forth in Section 4, below.
City has elected to include the following Project alternate(s) in the Contract:
2. Contract Documents. The Contract Documents incorporated into this Contract include and are comprised of all of the documents listed below. The definitions provided in Article 1 of the General Conditions apply to all of the Contract Documents, including this Contract.
2.1 Notice Inviting Bids;
2.2 Instructions to Bidders;
2.3 Addenda, if any;
2.4 Bid Proposal and attachments thereto;
2.5 Contract;
2.6 Payment and Performance Bonds;
2.7 General Conditions;
2.8 Special Conditions;
2.9 Project Plans and Specifications;
2.10 Change Orders, if any;
2.11 Notice of Potential Award;
2.12 Notice to Proceed; and
2.13 The following: Caltrans Standard Details, Location Map, Truck Traffic Restrictions Map, Cupertino Unified School District Calendar, Attachment A – Authorized Lane Closure Hours
3. Contractor’s Obligations. Contractor will perform all of the Work required for the Project, as specified in the Contract Documents. Contractor must provide, furnish, and supply all things necessary and incidental for the timely performance and completion of the Work, including all necessary labor, materials, supplies, tools, equipment, transportation, onsite facilities, and utilities, unless otherwise specified in the Contract Documents. Contractor must use its best efforts to diligently prosecute and complete the Work in a professional and expeditious manner and to meet or exceed the performance standards required by the Contract Documents.
4. Payment. As full and complete compensation for Contractor’s timely performance and completion of the Work in strict accordance with the terms and conditions of the Contract Documents, City will pay Contractor $___________________ (“Contract Price”) for all of Contractor’s direct and indirect costs to perform the Work, including all labor, materials, supplies, equipment, taxes, insurance, bonds and all overhead costs, in accordance with the payment provisions in the General Conditions.
5. Time for Completion. Contractor will fully complete the Work for the Project, meeting all requirements for Final Completion, within 70> calendar days from the start date set forth in the Notice to Proceed (“Contract Time”). By signing below, Contractor expressly waives any claim for delayed early completion.
163
CC 03-18-2025
163 of 541
2025 Slurry Seal / Fog Seal Project CONTRACT
Project # 2025-102 Page 27
6. Liquidated Damages. As further specified in Section 5.4 of the General Conditions, if Contractor fails to complete the Work within the Contract Time, City will assess liquidated damages in the amount of $1,500 per day for each day of unexcused delay in achieving Final Completion, and such liquidated damages may be deducted from City’s payments due or to become due to Contractor under this Contract.
7. Labor Code Compliance.
7.1 General. This Contract is subject to all applicable requirements of Chapter 1 of Part 7 of Division 2 of the Labor Code, including requirements pertaining to wages, working hours and workers’ compensation insurance, as further specified in Article 9 of the General Conditions.
7.2 Prevailing Wages. This Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Copies of these prevailing rates are available online at http://www.dir.ca.gov/DLSR.
7.3 DIR Registration. City may not enter into the Contract with a bidder without proof that the bidder and its Subcontractors are registered with the California Department of Industrial Relations to perform public work pursuant to Labor Code § 1725.5, subject to limited legal exceptions.
8. Workers’ Compensation Certification. Pursuant to Labor Code § 1861, by signing this Contract, Contractor certifies as follows: “I am aware of the provisions of Labor Code § 3700 which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the Work on this Contract.”
9. Conflicts of Interest. Contractor, its employees, Subcontractors, and agents may not have, maintain, or acquire a conflict of interest in relation to this Contract in violation of any City ordinance or requirement, or in violation of any California law, including Government Code § 1090 et seq., or the Political Reform Act, as set forth in Government Code § 81000 et seq. and its accompanying regulations. Any violation of this Section constitutes a material breach of the Contract.
10. Independent Contractor. Contractor is an independent contractor under this Contract and will have control of the Work and the means and methods by which it is performed. Contractor and its Subcontractors are not employees of City and are not entitled to participate in any health, retirement, or any other employee benefits from City.
11. Notice. Any notice, billing, or payment required by or pursuant to the Contract Documents must be made in writing, signed, dated, and sent to the other party by personal delivery, U.S. Mail, a reliable overnight delivery service, or by email as a PDF file. Notice is deemed effective upon delivery, except that service by U.S. Mail is deemed effective on the second working day after deposit for delivery. Notice for each party must be given as follows:
City:
Public Works Department
10300 Torre Ave Address
Cupertino, CA 95014 City/State/Zip
164
CC 03-18-2025
164 of 541
2025 Slurry Seal / Fog Seal Project CONTRACT
Project # 2025-102 Page 28
408-777-3245 Phone
Attn: Jo Anne Johnson Contact name
[email protected] Contact email address
Copy to: PW Invoices CC Contact name
[email protected] CC Contact email address
Contractor:
Name
Address
City/State/Zip
Phone
Attn: Contact name
Contact email address
Copy to: CC Contact name
CC Contact email address
12. General Provisions.
12.1 Assignment and Successors. Contractor may not assign its rights or obligations under this Contract, in part or in whole, without City’s written consent. This Contract is binding on Contractor’s and City’s lawful heirs, successors and permitted assigns.
12.2 Third Party Beneficiaries. There are no intended third-party beneficiaries to this Contract.
12.3 Governing Law and Venue. This Contract will be governed by California law and venue will be in the Santa Clara County Superior Court, and no other place.
Contractor waives any right it may have pursuant to Code of Civil Procedure § 394, to file a motion to transfer any action arising from or relating to this Contract to a venue outside of Santa Clara County, California.
12.4 Amendment. No amendment or modification of this Contract will be binding unless it is in a writing duly authorized and signed by the parties to this Contract.
12.5 Integration. This Contract and the Contract Documents incorporated herein, including authorized amendments or Change Orders thereto, constitute the final, complete, and exclusive terms of the agreement between City and Contractor.
12.6 Severability. If any provision of the Contract Documents is determined to be illegal, invalid, or unenforceable, in whole or in part, the remaining provisions of the Contract Documents will remain in full force and effect.
12.7 Iran Contracting Act. If the Contract Price exceeds $1,000,000, Contractor certifies, by signing below, that it is not identified on a list created under the Iran Contracting Act, Public Contract Code § 2200 et seq. (the “Act”), as a person engaging in investment activities in Iran, as defined in the Act, or is otherwise expressly exempt under the Act.
12.8 Authorization. Each individual signing below warrants that he or she is authorized to do so by the party that he or she represents, and that this Contract is legally 165
CC 03-18-2025
165 of 541
2025 Slurry Seal / Fog Seal Project CONTRACT
Project # 2025-102 Page 29
binding on that party. If Contractor is a corporation, signatures from two officers of the corporation are required pursuant to California Corporations Code § 313.
[Signatures are on the following page.]
166
CC 03-18-2025
166 of 541
2025 Slurry Seal / Fog Seal Project CONTRACT
Project # 2025-102 Page 30
The parties agree to this Contract as witnessed by the signatures below:
CITY: Approved as to form:
s/_______________________________ s/__________________________________
________________________________ ___________________________________ Name, Title Name, Title
Date: ___________________________ Date: ______________________________
Attest:
s/_______________________________
_________________________________
Name, Title
Date: ___________________________
CONTRACTOR: ___________________________________________________ Business Name
s/_______________________________ Seal:
_________________________________
Name, Title
Date: ____________________________
Second Signature (See Section 12.8):
s/_______________________________
_________________________________
Name, Title
Date: ____________________________
___________________________________________________
Contractor’s California License Number(s) and Expiration Date(s)
END OF CONTRACT
167
CC 03-18-2025
167 of 541
2025 Slurry Seal / Fog Seal Project CONTRACT
Project # 2025-102 Page 31
168
CC 03-18-2025
168 of 541
2025 Slurry Seal / Fog Seal Project PAYMENT BOND
Project # 2025-102 Page 32
Payment Bond
The City of Cupertino (“City”) and ________________________ (“Contractor”) have entered into a contract for work on the 2025 Slurry Seal / Fog Seal Project (“Project”). The Contract is incorporated by reference into this Payment Bond (“Bond”).
1. General. Under this Bond, Contractor as principal and ____________________________, its surety (“Surety”), are bound to City as obligee in an amount not less than $_________________, under California Civil Code § 9550 et seq., to ensure payment to authorized claimants. This Bond is binding on the respective successors, assigns, owners, heirs, or executors of Surety and Contractor.
2. Surety’s Obligation. If Contractor or any of its Subcontractors fails to pay a person authorized in California Civil Code § 9100 to assert a claim against a payment bond, any amounts due under the Unemployment Insurance Code with respect to work or labor performed under the Contract, or any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of Contractor and its Subcontractors under California Unemployment Insurance Code § 13020 with respect to the work and labor, then Surety will pay the obligation.
3. Beneficiaries. This Bond inures to the benefit of any of the persons named in California Civil Code § 9100, so as to give a right of action to those persons or their assigns in any suit brought upon this Bond. Contractor must promptly provide a copy of this Bond upon request by any person with legal rights under this Bond.
4. Duration. If Contractor promptly makes payment of all sums for all labor, materials, and equipment furnished for use in the performance of the Work required by the Contract, in conformance with the time requirements set forth in the Contract and as required by California law, Surety’s obligations under this Bond will be null and void. Otherwise, Surety’s obligations will remain in full force and effect.
5. Waivers. Surety waives any requirement to be notified of alterations to the Contract or extensions of time for performance of the Work under the Contract. Surety waives the provisions of Civil Code §§ 2819 and 2845. City waives the requirement of a new bond for any supplemental contract under Civil Code § 9550. Any notice to Surety may be given in the manner specified in the Contract and sent to Surety as follows:
Attn: _____________________________________________________ Address: _________________________________________________ City/State/Zip: _____________________________________________ Phone: ___________________________________________________ Email: ___________________________________________________
6. Law and Venue. This Bond will be governed by California law, and venue for any dispute pursuant to this Bond will be in the Santa Clara County Superior Court, and no other place.
Surety will be responsible for City’s attorneys’ fees and costs in any action to enforce the provisions of this Bond.
[Signatures are on the following page.]
169
CC 03-18-2025
169 of 541
2025 Slurry Seal / Fog Seal Project PAYMENT BOND
Project # 2025-102 Page 33
7. Effective Date; Execution. This Bond is entered into and is effective on _____________, 2025.
SURETY:
___________________________________
Business Name
s/__________________________________ ______________________________ Date
___________________________________
Name, Title
(Attach Acknowledgment with Notary Seal and Power of Attorney)
CONTRACTOR:
___________________________________
Business Name
s/__________________________________ ______________________________ Date
___________________________________
Name, Title
APPROVED BY CITY:
s/ __________________________________ ______________________________ Date
____________________________________
Name, Title
END OF PAYMENT BOND
170
CC 03-18-2025
170 of 541
2025 Slurry Seal / Fog Seal Project PERFORMANCE BOND
Project # 2025-102 Page 34
Performance Bond
The City of Cupertino (“City”) and __________________________ (“Contractor”) have entered into a contract for work on the 2025 Slurry Seal / Fog Seal Project (“Project”). The Contract is incorporated by reference into this Performance Bond (“Bond”).
1. General. Under this Bond, Contractor as principal and ___________________________, its surety (“Surety”), are bound to City as obligee for an amount not less than $__________________ to ensure Contractor’s faithful performance of its obligations under the Contract. This Bond is binding on the respective successors, assigns, owners, heirs, or executors of Surety and Contractor.
2. Surety’s Obligations. Surety’s obligations are co-extensive with Contractor’s obligations under the Contract. If Contractor fully performs its obligations under the Contract, including its warranty obligations under the Contract, Surety’s obligations under this Bond will become null and void. Otherwise, Surety’s obligations will remain in full force and effect.
3. Waiver. Surety waives any requirement to be notified of and further consents to any alterations to the Contract made under the applicable provisions of the Contract Documents, including changes to the scope of Work or extensions of time for performance of Work under the Contract. Surety waives the provisions of Civil Code §§ 2819 and 2845.
4. Application of Contract Balance. Upon making a demand on this Bond for completion of the Work prior to acceptance of the Project, City will make the Contract Balance available to Surety for completion of the Work under the Contract. For purposes of this provision, the Contract Balance is defined as the total amount payable by City to Contractor as the Contract Price minus amounts already paid to Contractor, and minus any liquidated damages, credits, or backcharges to which City is entitled under the terms of the Contract.
5. Contractor Default. Upon written notification from City of Contractor’s termination for default under Article 13 of the Contract General Conditions, time being of the essence, Surety must act within the time specified in Article 13 to remedy the default through one of the following courses of action:
5.1 Arrange for completion of the Work under the Contract by Contractor, with City’s consent, but only if Contractor is in default solely due to its financial inability to complete the Work;
5.2 Arrange for completion of the Work under the Contract by a qualified contractor acceptable to City, and secured by performance and payment bonds issued by an admitted surety as required by the Contract Documents, at Surety’s expense; or
5.3 Waive its right to complete the Work under the Contract and reimburse City the amount of City’s costs to have the remaining Work completed.
6. Surety Default. If Surety defaults on its obligations under the Bond, City will be entitled to recover all costs it incurs due to Surety’s default, including legal, design professional, or delay costs.
7. Notice. Any notice to Surety may be given in the manner specified in the Contract and sent to Surety as follows:
Attn: _____________________________________________________ Address: _________________________________________________ 171
CC 03-18-2025
171 of 541
2025 Slurry Seal / Fog Seal Project PERFORMANCE BOND
Project # 2025-102 Page 35
City/State/Zip: _____________________________________________ Phone: ___________________________________________________ Fax: _____________________________________________________ Email: ___________________________________________________
8. Law and Venue. This Bond will be governed by California law, and venue for any dispute pursuant to this Bond will be in the Santa Clara County Superior Court, and no other place.
Surety will be responsible for City’s attorneys’ fees and costs in any action to enforce the provisions of this Bond.
9. Effective Date; Execution. This Bond is entered into and effective on ____________________, 2025.
SURETY:
___________________________________
Business Name
s/__________________________________ ______________________________ Date
___________________________________
Name, Title
(Attach Acknowledgment with Notary Seal and Power of Attorney)
CONTRACTOR:
___________________________________
Business Name
s/__________________________________ ______________________________ Date
___________________________________
Name, Title
APPROVED BY CITY:
s/ __________________________________ ______________________________ Date
____________________________________
Name, Title
END OF PERFORMANCE BOND
172
CC 03-18-2025
172 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 36
General Conditions
Article 1 - Definitions
Definitions. The following definitions apply to all of the Contract Documents unless otherwise indicated, e.g., additional definitions that apply solely to the Specifications or other technical documents. Defined terms and titles of documents are capitalized in the Contract Documents, with the exception of the following (in any tense or form): “day,” “furnish,” “including,” “install,” “work day,” or “working day.”
Allowance means a specific amount that must be included in the Bid Proposal for a specified purpose.
Article, as used in these General Conditions, means a numbered Article of the General Conditions, unless otherwise indicated by the context.
Change Order means a written document duly approved and executed by City, which changes the scope of Work, the Contract Price, or the Contract Time.
City means the municipality which has entered into the Contract with Contractor for performance of the Work, acting through its City Council, officers, employees, City Engineer, and any other authorized representatives.
City Engineer means the City Engineer for City and his or her authorized delegee(s).
Claim means a separate demand by Contractor for a change in the Contract Time or Contract Price, that has previously been submitted to City in accordance with the requirements of the Contract Documents, and which has been rejected by City, in whole or in part; a written demand by Contractor disputing a unilateral Change Order or a portion thereof; or a written demand by Contractor objecting to the amount of Final Payment.
Contract means the signed agreement between City and Contractor for performing the Work required for the Project, and all documents expressly incorporated therein.
Contract Documents means, collectively, all of the documents listed as such in Section 2 of the Contract, including the Notice Inviting Bids; the Instructions to Bidders; addenda, if any; the Bid Proposal and attachments thereto; the Contract; the Notice of Potential Award and Notice to Proceed; the payment and performance bonds; the General Conditions; the Special Conditions; the Project Plans and Specifications; any Change Orders; and any other documents which are clearly and unambiguously made part of the Contract Documents. The Contract Documents do not include documents provided “For Reference Only,” or documents that are intended solely to provide information regarding existing conditions.
Contract Price means the total compensation to be paid to Contractor for performance of the Work, as set forth in the Contract and as may be amended by Change Order or adjusted for an Allowance. The Contract Price is not subject to adjustment due to inflation or due to the increased cost of labor, material, supplies, or equipment following submission of the Bid Proposal.
Contract Time means the time specified for complete performance of the Work, as set forth in the Contract and as may be amended by Change Order.
Contractor means the individual, partnership, corporation, or joint venture that has signed the Contract with City to perform the Work.
Day means a calendar day unless otherwise specified.
173
CC 03-18-2025
173 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 37
Design Professional means the licensed individual(s) or firm(s) retained by City to provide architectural, engineering, or other design professional services for the Project. If no Design Professional has been retained for this Project, any reference to Design Professional is deemed to refer to the Engineer.
DIR means the California Department of Industrial Relations.
Drawings has the same meaning as Plans.
Engineer means the City Engineer for the City of Cupertino and his or her authorized delegees.
Excusable Delay is defined in Section 5.3(B), Excusable Delay.
Extra Work means new or unforeseen work added to the Project, as determined by the Engineer in his or her sole discretion, including Work that was not part of or incidental to the scope of the Work when the Contractor’s bid was submitted; Work that is substantially different from the Work as described in the Contract Documents at bid time; or Work that results from a substantially differing and unforeseeable condition.
Final Completion means Contractor has fully completed all of the Work required by the Contract Documents to the City’s satisfaction, including all punch list items and any required commissioning or training, and has provided the City with all required submittals, including the instructions and manuals, product warranties, and as-built drawings.
Final Payment means payment to Contractor of the unpaid Contract Price, including release of undisputed retention, less amounts withheld or deducted pursuant to the Contract Documents.
Furnish means to purchase and deliver for the Project.
Government Code Claim means a claim submitted pursuant to California Government Code § 900 et seq.
Hazardous Materials means any substance or material identified now or in the future as hazardous under any Laws, or any other substance or material that may be considered hazardous or otherwise subject to Laws governing handling, disposal, or cleanup.
Including, whether or not capitalized, means “including, but not limited to,” unless the context clearly requires otherwise.
Inspector means the individual(s) or firm(s) retained or employed by City to inspect the workmanship, materials, and manner of construction of the Project and its components to ensure compliance with the Contract Documents and all Laws.
Install means to fix in place for materials, and to fix in place and connect for equipment.
Laws means all applicable local, state, and federal laws, regulations, rules, codes, ordinances, permits, orders, and the like enacted or imposed by or under the auspices of any governmental entity with jurisdiction over any of the Work or any performance of the Work, including health and safety requirements.
Non-Excusable Delay is defined in Section 5.3(D), Non-Excusable Delay.
Plans means the City-provided plans, drawings, details, or graphical depictions of the Project requirements, but does not include Shop Drawings.
174
CC 03-18-2025
174 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 38
Project means the public works project referenced in the Contract, as modified by any Project alternates elected by City, if any.
Project Manager means the individual designated by City to oversee and manage the Project on City’s behalf and may include his or her authorized delegee(s) when the Project Manager is unavailable. If no Project Manager has been designated for this Project, any reference to Project Manager is deemed to refer to the Engineer.
Recoverable Costs is defined in Section 5.3(F), Recoverable Costs.
Request for Information or RFI means Contractor’s written request for information about the Contract Documents, the Work or the Project, submitted to City in the manner and format specified by City.
Section, when capitalized in these General Conditions, means a numbered section or subsection of the General Conditions, unless the context clearly indicates otherwise.
Shop Drawings means drawings, plan details or other graphical depictions prepared by or on behalf of Contractor, and subject to City acceptance, which are intended to provide details for fabrication, installation, and the like, of items required by or shown in the Plans or Specifications.
Specialty Work means Work that must be performed by a specialized Subcontractor with the specified license or other special certification, and that the Contractor is not qualified to self- perform.
Specifications means the technical, text specifications describing the Project requirements, which are prepared for and incorporated into the Contract by or on behalf of City, and does not include the Contract, General Conditions or Special Conditions.
Subcontractor means an individual, partnership, corporation, or joint venture retained by Contractor directly or indirectly through a subcontract to perform a specific portion of the Work.
The term Subcontractor applies to subcontractors of all tiers, unless otherwise indicated by the context. A third party such as a utility performing related work on the Project is not a Subcontractor, even if Contractor must coordinate its Work with the third party.
Technical Specifications has the same meaning as Specifications.
Work means all of the construction and services necessary for or incidental to completing the Project in conformance with the requirements of the Contract Documents.
Work Day or Working Day, whether or not capitalized, means a weekday when the City is open for business, and does not include holidays observed by the City.
Holidays observed by the City and furlough days are:
a. New Year’s Day, January 1;
b. Martin Luther King Jr.’s Birthday, third Monday in January; c. Lunar New Year, date varies, approximately the first week in February; d. Presidents’ Day, third Monday in February;
e. Cesar Chavez Day, March 31 or April 1 observed
f. Memorial Day, last Monday in May;
g. Juneteenth, June 19
h. Independence Day, July 4;
175
CC 03-18-2025
175 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 39
i. Labor Day, first Monday in September;
j. Veterans’ Day, November 11;
k. Thanksgiving Day, as designated by the President;
l. The Day following Thanksgiving Day;
m. Christmas Day, December 25;
n. City Closure, December 24, 26, 27,28,29,30 and 31: and each day appointed by the Governor of California and formally recognized by the Santa Clara County Board of Supervisors as a day of mourning, thanksgiving, or special observance.
Worksite means the place or places where the Work is performed, which includes, but may extend beyond the Project site, including separate locations for staging, storage, or fabrication.
Article 2 - Roles and Responsibilities
2.1 City.
(A) City Council. The City Council has final authority in all matters affecting the Project, except to the extent it has delegated authority to the Engineer.
(B) Engineer. The Engineer, acting within the authority conferred by the City Council, is responsible for administration of the Project on behalf of City, including authority to provide directions to the Design Professional and to Contractor to ensure proper and timely completion of the Project. The Engineer’s decisions are final and conclusive within the scope of his or her authority, including interpretation of the Contract Documents.
(C) Project Manager. The Project Manager assigned to the Project will be the primary point of contact for the Contractor and will serve as City’s representative for daily administration of the Project on behalf of City. Unless otherwise specified, all of Contractor’s communications to City (in any form) will go to or through the Project Manager. City reserves the right to reassign the Project Manager role at any time or to delegate duties to additional City representatives, without prior notice to or consent of Contractor.
(D) Design Professional. The Design Professional is responsible for the overall design of the Project and, to the extent authorized by City, may act on City’s behalf to ensure performance of the Work in compliance with the Plans and Specifications, including any design changes authorized by Change Order. The Design Professional’s duties may include review of Contractor’s submittals, visits to any Worksite, inspecting the Work, evaluating test and inspection results, and participation in Project-related meetings, including any pre-construction conference, weekly meetings, and coordination meetings. The Design Professional’s interpretation of the Plans or Specifications is final and conclusive.
2.2 Contractor.
(A) General. Contractor must provide all labor, materials, supplies, equipment, services, and incidentals necessary to perform and timely complete the Work in strict accordance with the Contract Documents, and in an economical and efficient manner in the best interests of City, and with minimal inconvenience to the public.
176
CC 03-18-2025
176 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 40
(B) Responsibility for the Work and Risk of Loss. Contractor is responsible for supervising and directing all aspects of the Work to facilitate the efficient and timely completion of the Work. Contractor is solely responsible for and required to exercise full control over the Work, including the construction means, methods, techniques, sequences, procedures, safety precautions and programs, and coordination of all portions of the Work with that of all other contractors and Subcontractors, except to the extent that the Contract Documents provide other specific instructions. Contractor’s responsibilities extend to any plan, method or sequence suggested, but not required by City or specified in the Contract Documents. From the date of commencement of the Work until either the date on which City formally accepts the Project or the effective date of termination of the Contract, whichever is later, Contractor bears all risks of injury or damage to the Work and the materials and equipment delivered to any Worksite, by any cause including fire, earthquake, wind, weather, vandalism, or theft, subject to the limitations of Laws, including Public Contract Code § 7105.
(C) Project Administration. Contractor must provide sufficient and competent administration, staff, and skilled workforce necessary to perform and timely complete the Work in accordance with the Contract Documents. Before starting the Work, Contractor must designate in writing and provide complete contact information, including telephone numbers and email address, for the officer or employee in Contractor’s organization who is to serve as Contractor’s primary representative for the Project, and who has authority to act on Contractor’s behalf. A Subcontractor may not serve as Contractor’s primary representative.
(D) On-Site Superintendent. Contractor must, at all times during performance of the Work, provide a qualified and competent full-time superintendent acceptable to City, and assistants as necessary, who must be physically present at the Project site while any aspect of the Work is being performed. The superintendent must have full authority to act and communicate on behalf of Contractor, and Contractor will be bound by the superintendent’s communications to City. City’s approval of the superintendent is required before the Work commences. If City is not satisfied with the superintendent’s performance, City may request a qualified replacement of the superintendent. Failure to comply may result in temporary suspension of the Work, at Contractor’s sole expense and with no extension of Contract Time, until an approved superintendent is physically present to supervise the Work. Contractor must provide written notice to City, as soon as practicable, before replacing the superintendent.
(E) Standards. Contractor must, at all times, ensure that the Work is performed in an efficient, skillful manner following best practices and in full compliance with the Contract Documents, Laws, and applicable manufacturer’s recommendations. Contractor has a material and ongoing obligation to provide true and complete information, to the best of its knowledge, with respect to all records, documents, or communications pertaining to the Project, including oral or written reports, statements, certifications, Change Order requests, or Claims.
(F) Meetings. Contractor, its project manager, superintendent and any primary Subcontractors requested by City, must attend a pre-construction conference, if requested by City, as well as weekly Project progress meetings scheduled with City. If applicable, Contractor may also be required to participate in coordination meetings with other parties relating to other work being performed on or near the Project site or in relation to the Project, including work or activities performed by City, other contractors, or other utility owners.
(G) Construction Records. Contractor will maintain up-to-date, thorough, legible, and dated daily job reports, which document all significant activity on the Project for each day that Work is performed on the Project. The daily report for each day must include the 177
CC 03-18-2025
177 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 41
number of workers at the Project site; primary Work activities; major deliveries; problems encountered, including injuries, if any; weather and site conditions; and delays, if any.
Contractor will take date and time-stamped photographs to document general progress of the Project, including site conditions prior to construction activities, before and after photographs at offset trench laterals, existing improvements and utilities, damage and restoration. Contractor will maintain copies of all subcontracts, Project-related correspondence with Subcontractors, and records of meetings with Subcontractors. Upon request by the City, Contractor will permit review of and/or provide copies of any of these construction records.
(H) Responsible Party. Contractor is solely responsible to City for the acts or omissions of any Subcontractors, or any other party or parties performing portions of the Work or providing equipment, materials or services for or on behalf of Contractor or the Subcontractors. Upon City’s written request, Contractor must promptly and permanently remove from the Project, at no cost to City, any employee or Subcontractor or employee of a Subcontractor who the Engineer has determined to be incompetent, intemperate or disorderly, or who has failed or refused to perform the Work as required under the Contract Documents.
(I) Correction of Defects. Contractor must promptly correct, at Contractor’s sole expense, any Work that is determined by City to be deficient or defective in any way, including workmanship, materials, parts, or equipment. Workmanship, materials, parts, or equipment that do not conform to the requirements under the Contract Documents, as determined by City, will be considered defective and subject to rejection. Contractor must also promptly correct, at Contractor’s sole expense, any Work performed beyond the lines and grades shown on the Plans or established by City, and any Extra Work performed without City’s prior written approval. If Contractor fails to correct or to take reasonable steps toward correcting defective Work within five days following notice from City, or within the time specified in City’s notice to correct, City may elect to have the defective Work corrected by its own forces or by a third party, in which case the cost of correction will be deducted from the Contract Price. If City elects to correct defective Work due to Contractor’s failure or refusal to do so, City or its agents will have the right to take possession of and use any equipment, supplies, or materials available at the Project site or any Worksite on City property, in order to effectuate the correction, at no extra cost to City. Contractor’s warranty obligations under Section 11.2, Warranty, will not be waived nor limited by City’s actions to correct defective Work under these circumstances.
Alternatively, City may elect to retain defective Work, and deduct the difference in value, as determined by the Engineer, from payments otherwise due to Contractor. This paragraph applies to any defective Work performed by Contractor during the one-year warranty period under Section 11.2.
(J) Contractor’s Records. Contractor must maintain all of its records relating to the Project in any form, including paper documents, photos, videos, electronic records, approved samples, and the construction records required pursuant to paragraph (G), above. Project records subject to this provision include complete Project cost records and records relating to preparation of Contractor’s bid, including estimates, take-offs, and price quotes or bids.
(1) Contractor’s cost records must include all supporting documentation, including original receipts, invoices, and payroll records, evidencing its direct costs to perform the Work, including, but not limited to, costs for labor, materials, and equipment. Each cost record should include, at a minimum, a description of the expenditure with references to the applicable requirements of the Contract Documents, the amount actually paid, the date of payment, and whether the expenditure is part of the original Contract Price, related to an executed Change Order, or otherwise categorized by Contractor as Extra Work. Contractor’s failure 178
CC 03-18-2025
178 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 42
to comply with this provision as to any claimed cost operates as a waiver of any rights to recover the claimed cost.
(2) Contractor must continue to maintain its Project-related records in an organized manner for a period of five years after City’s acceptance of the Project or following Contract termination, whichever occurs first. Subject to prior notice to Contractor, City is entitled to inspect or audit any of Contractor’s records relating to the Project during Contractor’s normal business hours. Contractor’s records may also be subject to examination and audit by the California State Auditor, pursuant to Government Code § 8546.7. The record-keeping requirements set forth in this subsection 2.2(J) will survive expiration or termination of the Contract.
(K) Copies of Project Documents. Contractor and its Subcontractors must keep copies, at the Project site, of all Work-related documents, including the Contract, permit(s), Plans, Specifications, addenda, Contract amendments, Change Orders, RFIs and RFI responses, Shop Drawings, as-built drawings, schedules, daily records, testing and inspection reports or results, and any related written interpretations. These documents must be available to City for reference at all times during construction of the Project.
2.3 Subcontractors.
(A) General. All Work which is not performed by Contractor with its own forces must be performed by Subcontractors. City reserves the right to approve or reject any and all Subcontractors proposed to perform the Work, for reasons including the Subcontractor’s poor reputation, lack of relevant experience, financial instability, and lack of technical ability or adequate trained workforce. Each Subcontractor must obtain a City business license before performing any Work.
(B) Contractual Obligations. Contractor must require each Subcontractor to comply with the provisions of the Contract Documents as they apply to the Subcontractor’s portion(s) of the Work, including the generally applicable terms of the Contract Documents, and to likewise bind their subcontractors. Contractor will provide that the rights that each Subcontractor may have against any manufacturer or supplier for breach of warranty or guarantee relating to items provided by the Subcontractor for the Project, will be assigned to City. Nothing in these Contract Documents creates a contractual relationship between a Subcontractor and City, but City is deemed to be a third-party beneficiary of the contract between Contractor and each Subcontractor.
(C) Termination. If the Contract is terminated, each Subcontractor’s agreement must be assigned by Contractor to City, subject to the prior rights of any surety, but only if and to the extent that City accepts, in writing, the assignment by written notification, and assumes all rights and obligations of Contractor pursuant to each such subcontract agreement.
(D) Substitution of Subcontractor. If Contractor requests substitution of a listed Subcontractor under Public Contract Code § 4107, Contractor is solely responsible for all costs City incurs in responding to the request, including legal fees and costs to conduct a hearing, and any increased subcontract cost to perform the Work that was to be performed by the listed Subcontractor. If City determines that a Subcontractor is unacceptable to City based on the Subcontractor’s failure to satisfactorily perform its Work, or for any of the grounds for substitution listed in Public Contract Code § 4107(a), City may request removal of the Subcontractor from the Project. Upon receipt of a written request from City to remove a Subcontractor pursuant to this paragraph, Contractor will 179
CC 03-18-2025
179 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 43
immediately remove the Subcontractor from the Project and, at no further cost to City, will either (1) self-perform the remaining Work to the extent that Contractor is duly licensed and qualified to do so, or (2) substitute a Subcontractor that is acceptable to City, in compliance with Public Contract Code § 4107, as applicable.
2.4 Coordination of Work.
(A) Concurrent Work. City reserves the right to perform, have performed, or permit performance of other work on or adjacent to the Project site while the Work is being performed for the Project. Contractor is responsible for coordinating its Work with other work being performed on or adjacent to the Project site, including by any utility companies or agencies, and must avoid hindering, delaying, or interfering with the work of other contractors, individuals, or entities, and must ensure safe and reasonable site access and use as required or authorized by City. To the full extent permitted by law, Contractor must hold harmless and indemnify City against any and all claims arising from or related to Contractor’s avoidable, negligent, or willful hindrance of, delay to, or interference with the work of any utility company or agency or another contractor or subcontractor.
(B) Coordination. If Contractor’s Work will connect or interface with work performed by others, Contractor is responsible for independently measuring and visually inspecting such work to ensure a correct connection and interface. Contractor is responsible for any failure by Contractor or its Subcontractors to confirm measurements before proceeding with connecting Work. Before proceeding with any portion of the Work affected by the construction or operations of others, Contractor must give the Project Manager prompt written notification of any defects Contractor discovers which will prevent the proper execution of the Work. Failure to give notice of any known or reasonably discoverable defects will be deemed acknowledgement by Contractor that the work of others is not defective and will not prevent the proper execution of the Work. Contractor must also promptly notify City if work performed by others, including work or activities performed by City’s own forces, is operating to hinder, delay, or interfere with Contractor’s timely performance of the Work. City reserves the right to backcharge Contractor for any additional costs incurred due to Contractor’s failure to comply with the requirements in this Section 2.4.
2.5 Submittals. Unless otherwise specified, Contractor must submit to the Engineer for review and acceptance, all schedules, Shop Drawings, samples, product data, and similar submittals required by the Contract Documents, or upon request by the Engineer.
Unless otherwise specified, all submittals, including Requests for Information, are subject to the general provisions of this Section, as well as specific submittal requirements that may be included elsewhere in the Contract Documents, including the Special Conditions or Specifications. The Engineer may require submission of a submittal schedule at or before a pre-construction conference, as may be specified in the Notice to Proceed.
(A) General. Contractor is responsible for ensuring that its submittals are accurate and conform to the Contract Documents.
(B) Time and Manner of Submission. Contractor must ensure that its submittals are prepared and delivered in a manner consistent with the current City-accepted schedule for the Work and within the applicable time specified in the Contract Documents, or if no time is specified, in such time and sequence so as not to delay the performance of the Work or completion of the Project.
(C) Required Contents. Each submittal must include the Project name and contract number, Contractor’s name and address, the name and address of any Subcontractor or 180
CC 03-18-2025
180 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 44
supplier involved with the submittal, the date, and references to applicable Specification section(s) and/or drawing and detail number(s).
(D) Required Corrections. If corrections are required, Contractor must promptly make and submit any required corrections as specified in full conformance with the requirements of this Section, or other requirements that apply to that submittal.
(E) Effect of Review and Acceptance. Review and acceptance of a submittal by City will not relieve Contractor from complying with the requirements of the Contract Documents. Contractor is responsible for any errors in any submittal, and review or acceptance of a submittal by City is not an assumption of risk or liability by City.
(F) Enforcement. Any Work performed or any material furnished, installed, fabricated or used without City’s prior acceptance of a required submittal is performed or provided at Contractor’s risk, and Contractor may be required to bear the costs incident thereto, including the cost of removing and replacing such Work, repairs to other affected portions of the Work or material, and the cost of additional time or services required of City, including costs for the Design Professional, Project Manager, or Inspector.
(G) Excessive RFIs. A RFI will be considered excessive or unnecessary if City determines that the explanation or response to the RFI is clearly and unambiguously discernable from the Contract Documents. City’s costs to review and respond to excessive or unnecessary RFIs may be deducted from payments otherwise due to Contractor.
2.6 Shop Drawings. When Shop Drawings are required by the Specifications or requested by the Engineer, they must be prepared according to best practices at Contractor’s expense. The Shop Drawings must be of a size and scale to clearly show all necessary details. Unless otherwise specified by City, Shop Drawings must be provided to the Engineer for review and acceptance at least 30 days before the Work will be performed.
If City requires changes, the corrected Shop Drawings must be resubmitted to the Engineer for review within the time specified by the Engineer. For all Project components requiring Shop Drawings, Contractor will not furnish materials or perform any Work until the Shop Drawings for those components are accepted by City. Contractor is responsible for any errors or omissions in the Shop Drawings, shop fits and field corrections; any deviations from the Contract Documents; and for the results obtained by the use of Shop Drawings. Acceptance of Shop Drawings by City does not relieve Contractor of Contractor’s responsibility.
2.7 Access to Work. Contractor must afford prompt and safe access to any Worksite by City and its employees, agents, or consultants authorized by City; and upon request by City, Contractor must promptly arrange for City representatives to visit or inspect manufacturing sites or fabrication facilities for items to be incorporated into the Work.
2.8 Personnel. Contractor and its Subcontractors must employ only competent and skillful personnel to perform the Work. Contractor and its Subcontractor’s supervisors, security or safety personnel, and employees who have unescorted access to the Project site must possess proficiency in English sufficient to read, understand, receive, and implement oral or written communications or instructions relating to their respective job functions, including safety and security requirements. Upon written notification from the Engineer, Contractor and its Subcontractors must immediately discharge any personnel who are incompetent, disorderly, disruptive, threatening, abusive, or profane, or otherwise refuse or fail to comply with the requirements of the Contract Documents or Laws, including Laws pertaining to health and safety. Any such discharged personnel may not be re- employed or permitted on the Project in any capacity without City’s prior written consent.
181
CC 03-18-2025
181 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 45
Article 3 - Contract Documents
3.1 Interpretation of Contract Documents.
(A) Plans and Specifications. The Plans and Specifications included in the Contract Documents are complementary. If Work is shown on one but not on the other, Contractor must perform the Work as though fully described on both, consistent with the Contract Documents and reasonably inferable from them as being necessary to produce the indicated results. The Plans and Specifications are deemed to include and require everything necessary and reasonably incidental to completion of the Work, whether or not particularly mentioned or shown. Contractor must perform all Work and services and supply all things reasonably related to and inferable from the Contract Documents. In the event of a conflict between the Plans and Specifications, the Specifications will control, unless the drawing(s) at issue are dated later than the Specification(s) at issue. Detailed drawings take precedence over general drawings, and large-scale drawings take precedence over smaller scale drawings. Any arrangement or division of the Plans and Specifications into sections is for convenience and is not intended to limit the Work required by separate trades. A conclusion presented in the Plans or Specifications is only a recommendation. Actual locations and depths must be determined by Contractor’s field investigation. Contractor may request access to underlying or background information in City’s possession that is necessary for Contractor to form its own conclusions.
(B) Duty to Notify and Seek Direction. If Contractor becomes aware of a changed condition in the Project, or of any ambiguity, conflict, inconsistency, discrepancy, omission, or error in the Contract Documents, including the Plans or Specifications, Contractor must promptly submit a Request for Information to the Engineer and wait for a response from City before proceeding further with the related Work. The RFI must notify City of the issue and request clarification, interpretation or direction. The Engineer’s clarification, interpretation or direction will be final and binding on Contractor. If Contractor proceeds with the related Work before obtaining City’s response, Contractor will be responsible for any resulting costs, including the cost of correcting any incorrect or defective Work that results. Timely submission of a clear and complete RFI is essential to avoiding delay. Delay resulting from Contractor’s failure to submit a timely and complete RFI to the Engineer is Non-Excusable Delay. If Contractor believes that City’s response to an RFI justifies a change to the Contract Price or Contract Time, Contractor must perform the Work as directed, but may submit a timely Change Order request in accordance with the Contract Documents. (See Articles 5 and 6.)
(C) Figures and Dimensions. Figures control over scaled dimensions.
(D) Technical or Trade Terms. Any terms that have well-known technical or trade meanings will be interpreted in accordance with those meanings, unless otherwise specifically defined in the Contract Documents.
(E) Measurements. Contractor must verify all relevant measurements in the Contract Documents and at the Project site before ordering any material or performing any Work, and will be responsible for the correctness of those measurements or for costs that could have been avoided by independently verifying measurements.
(F) Compliance with Laws. The Contract Documents are intended to comply with Laws and will be interpreted to comply with Laws.
3.2 Order of Precedence. Information included in one Contract Document but not in another will not be considered a conflict or inconsistency. Unless otherwise specified in the Special Conditions, in case of any conflict or inconsistency among the Contract 182
CC 03-18-2025
182 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 46
Documents, the following order of precedence will apply, beginning from highest to lowest, with the most recent version taking precedent over an earlier version:
(A) Change Orders;
(B) Addenda;
(C) Contract;
(D) Notice to Proceed;
(E) Attachment B – Federal Contract Requirements (only if used); (F) Special Conditions;
(G) General Conditions;
(H) Payment and Performance Bonds;
(I) Specifications;
(J) Plans;
(K) Notice of Potential Award;
(L) Notice Inviting Bids;
(M) Attachment A – Federal Bidding Requirements (only if used); (N) Instructions to Bidders;
(O) Contractor’s Bid Proposal and attachments;
(P) the City’s standard specifications, as applicable; and (Q) Any generic documents prepared by and on behalf of a third party, that were not prepared specifically for this Project, such as the Caltrans Standard Specifications or Caltrans Special Provisions.
3.3 Caltrans Standard Specifications. Any reference to or incorporation of the Standard Specifications of the State of California, Department of Transportation (“Caltrans”), including “Standard Specifications,” “Caltrans Specifications,” “State Specifications,” or “CSS,” means the most current edition of Caltrans’ Standard Specifications, unless otherwise specified (“Caltrans Standard Specifications”), including the most current amendments as of the date that Contractor’s bid was submitted for this Project. The following provisions apply to use of or reference to the Caltrans Standard Specifications or Special Provisions:
(A) Limitations. The “General Provisions” of the Caltrans Standard Specifications, i.e., sections 1 through 9, do not apply to these Contract Documents with the exception of any specific provisions, if any, which are expressly stated to apply to these Contract Documents.
(B) Conflicts or Inconsistencies. If there is a conflict or inconsistency between any provision in the Caltrans Standard Specifications or Special Provisions and a provision of these Contract Documents, as determined by City, the provision in the Contract Documents will govern.
(C) Meanings. Terms used in the Caltrans Standard Specifications or Special Provisions are to be interpreted as follows:
(1) Any reference to the “Engineer” is deemed to mean the City Engineer.
(2) Any reference to the “Special Provisions” is deemed to mean the Special Conditions, unless the Caltrans Special Provisions are expressly included in the Contract Documents listed in Section 2 of the Contract.
(3) Any reference to the “Department” or “State” is deemed to mean City.
3.4 For Reference Only. Contractor is responsible for the careful review of any document, study, or report provided by City or appended to the Contract Documents solely for informational purposes and identified as “For Reference Only.” Nothing in any document, 183
CC 03-18-2025
183 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 47
study, or report so appended and identified is intended to supplement, alter, or void any provision of the Contract Documents. Contractor is advised that City or its representatives may be guided by information or recommendations included in such reference documents, particularly when making determinations as to the acceptability of proposed materials, methods, or changes in the Work. Any record drawings or similar final or accepted drawings or maps that are not part of the Contract Documents are deemed to be For Reference Only. The provisions of the Contract Documents are not modified by any perceived or actual conflict with provisions in any document that is provided For Reference Only.
3.5 Current Versions. Unless otherwise specified by City, any reference to standard specifications, technical specifications, or any City or state codes or regulations means the latest specification, code, or regulation in effect on the date that bids were due.
3.6 Conformed Copies. If City prepares a conformed set of the Contract Documents following award of the Contract, it will provide Contractor with one copy of the electronic file in PDF format. It is Contractor’s responsibility to ensure that all Subcontractors, including fabricators, are provided with the conformed set of the Contract Documents at Contractor’s sole expense.
3.7 Ownership. No portion of the Contract Documents may be used for any purpose other than construction of the Project, without prior written consent from City. Contractor is deemed to have conveyed the copyright in any designs, drawings, specifications, Shop Drawings, or other documents (in paper or electronic form) developed by Contractor for the Project, and City will retain all rights to such works, including the right to possession.
Article 4 - Bonds, Indemnity, and Insurance
4.1 Payment and Performance Bonds. Within ten days following issuance of the Notice of Potential Award, Contractor is required to provide a payment bond and a performance bond, each in the penal sum of not less than 100% of the Contract Price, and each executed by Contractor and its surety using the bond forms included with the Contract Documents.
(A) Surety. Each bond must be issued and executed by a surety admitted in California. If an issuing surety cancels the bond or becomes insolvent, within seven days following written notice from City, Contractor must substitute a surety acceptable to City.
If Contractor fails to substitute an acceptable surety within the specified time, City may, at its sole discretion, withhold payment from Contractor until the surety is replaced to City’s satisfaction, or terminate the Contract for default.
(B) Supplemental Bonds for Increase in Contract Price. If the Contract Price increases during construction by five percent or more over the original Contract Price, Contractor must provide supplemental or replacement bonds within ten days of written notice from City pursuant to this Section, covering 100% of the increased Contract Price and using the bond forms included with the Contract Documents.
4.2 Indemnity. To the fullest extent permitted by law, Contractor must indemnify, defend, and hold harmless City, its Council, officers, officials, employees, agents, volunteers, and consultants (individually, an “Indemnitee,” and collectively the “Indemnitees”) from and against any and all liability, loss, damage, claims, causes of action, demands, charges, fines, costs, and expenses (including, without limitation, attorney fees, expert witness fees, paralegal fees, and fees and costs of litigation or arbitration) (collectively, “Liability”) of every nature arising out of or in connection with the acts or omissions of Contractor, its 184
CC 03-18-2025
184 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 48
employees, Subcontractors, representatives, or agents, in bidding or performing the Work or in failing to comply with any obligation of Contractor under the Contract, except such Liability caused by the active negligence, sole negligence, or willful misconduct of an Indemnitee. This indemnity requirement applies to any Liability arising from alleged defects in the content or manner of submission of Contractor’s bid for the Contract.
Contractor’s failure or refusal to timely accept a tender of defense pursuant to this Contract will be deemed a material breach of the Contract. City will timely notify Contractor upon receipt of any third-party claim relating to the Contract, as required by Public Contract Code § 9201. Contractor waives any right to express or implied indemnity against any Indemnitee. Contractor’s indemnity obligations under this Contract will survive the expiration or any early termination of the Contract.
4.3 Insurance. No later than ten days following issuance of the Notice of Potential Award, Contractor must procure and provide proof of the insurance coverage required by this Section in the form of certificates and endorsements acceptable to City. The required insurance must cover the activities of Contractor and its Subcontractors relating to or arising from the performance of the Work, and must remain in full force and effect at all times during the period covered by the Contract, through the date of City’s acceptance of the Project. All required insurance must be issued by a company licensed to do business in the State of California, and each such insurer must have an A.M. Best’s financial strength rating of “A” or better and a financial size rating of “VIII” or better. If Contractor fails to provide any of the required coverage in full compliance with the requirements of the Contract Documents, City may, at its sole discretion, purchase such coverage at Contractor’s expense and deduct the cost from payments due to Contractor, or terminate the Contract for default. The procurement of the required insurance will not be construed to limit Contractor’s liability under this Contract or to fulfill Contractor’s indemnification obligations under this Contract.
(A) Policies and Limits. The following insurance policies and limits are required for this Contract, unless otherwise specified in the Special Conditions:
(1) Commercial General Liability (“CGL”) Insurance: The CGL insurance policy must be issued on an occurrence basis, written on a comprehensive general liability form, and must include coverage for liability arising from Contractor’s or its Subcontractor’s acts or omissions in the performance of the Work, including contractor’s protective coverage, contractual liability, products and completed operations, and broad form property damage, with limits of at least $2,000,000 per occurrence and at least $4,000,000 general aggregate. The CGL insurance coverage may be arranged under a single policy for the full limits required or by a combination of underlying policies with the balance provided by excess or umbrella policies, provided each such policy complies with the requirements set forth in this Section, including required endorsements.
(2) Automobile Liability Insurance: The automobile liability insurance policy must provide coverage of at least $2,000,000 combined single-limit per accident for bodily injury, death, or property damage, including hired and non-owned auto liability.
(3) Workers’ Compensation Insurance and Employer’s Liability: The workers’ compensation and employer’s liability insurance policy must comply with the requirements of the California Labor Code, providing coverage of at least $1,000,000 or as otherwise required by the statute. If Contractor is self-insured, Contractor must provide its Certificate of Permission to Self-Insure, duly authorized by the DIR.
185
CC 03-18-2025
185 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 49
(4) Pollution Liability Insurance: The pollution liability insurance policy must be issued on an occurrence basis, providing coverage of at least $2,000,000 for all loss arising out of claims for bodily injury, death, property damage, or environmental damage caused by pollution conditions resulting from the Work.
(5) Builder’s Risk Insurance: The builder’s risk insurance policy must be issued on an occurrence basis, for all-risk or “all perils” coverage on a 100% completed value basis on the insurable portion of the Project for the benefit of City.
(B) Notice. Each certificate of insurance must state that the coverage afforded by the policy or policies will not be reduced, cancelled or allowed to expire without at least 30 days advance written notice to City, unless due to non-payment of premiums, in which case ten days advance written notice must be made to City.
(C) Waiver of Subrogation. Each required policy must include an endorsement providing that the carrier will waive any right of subrogation it may have against City.
(D) Required Endorsements. The CGL policy, automobile liability policy, pollution liability policy, and builder’s risk policy must include the following specific endorsements:
(1) The City, including its Council, officials, officers, employees, agents, volunteers and consultants (collectively, “Additional Insured”) must be named as an additional insured for all liability arising out of the operations by or on behalf of the named insured, and the policy must protect the Additional Insured against any and all liability for personal injury, death or property damage or destruction arising directly or indirectly in the performance of the Contract. The additional insured endorsement must be provided using ISO form CG 20 10 11 85 or equivalent form(s) approved by the City.
(2) The inclusion of more than one insured will not operate to impair the rights of one insured against another, and the coverages afforded will apply as though separate policies have been issued to each insured.
(3) The insurance provided by Contractor is primary and no insurance held or owned by any Additional Insured may be called upon to contribute to a loss.
(4) This policy does not exclude explosion, collapse, underground excavation hazard, or removal of lateral support.
(E) Contractor’s Responsibilities. This Section 4.3 establishes the minimum requirements for Contractor’s insurance coverage in relation to this Project, but is not intended to limit Contractor’s ability to procure additional or greater coverage. Contractor is responsible for its own risk assessment and needs and is encouraged to consult its insurance provider to determine what coverage it may wish to carry beyond the minimum requirements of this Section. Contractor is solely responsible for the cost of its insurance coverage, including premium payments, deductibles, or self-insured retentions, and no Additional Insured will be responsible or liable for any of the cost of Contractor’s insurance coverage.
(F) Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions that apply to the required insurance (collectively, “deductibles”) in excess of $100,000 are subject to approval by the City’s Risk Manager, acting in his or her sole discretion, and must be declared by Contractor when it submits its certificates of insurance and endorsements pursuant to this Section 4.3. If the City’s Risk Manager determines that the deductibles are unacceptably high, at City’s option, Contractor must either reduce or eliminate the deductibles as they apply to City and all required Additional 186
CC 03-18-2025
186 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 50
Insured; or must provide a financial guarantee, to City’s satisfaction, guaranteeing payment of losses and related investigation, claim administration, and legal expenses.
(G) Subcontractors. Contractor must ensure that each Subcontractor is required to maintain the same insurance coverage required under this Section 4.3, with respect to its performance of Work on the Project, including those requirements related to the Additional Insureds and waiver of subrogation, but excluding pollution liability or builder’s risk insurance unless otherwise specified in the Special Conditions. A Subcontractor may be eligible for reduced insurance coverage or limits, but only to the extent approved in writing in advance by the City’s Risk Manager. Contractor must confirm that each Subcontractor has complied with these insurance requirements before the Subcontractor is permitted to begin Work on the Project. Upon request by the City, Contractor must provide certificates and endorsements submitted by each Subcontractor to prove compliance with this requirement. The insurance requirements for Subcontractors do not replace or limit the Contractor’s insurance obligations.
Article 5 - Contract Time
5.1 Time is of the Essence. Time is of the essence in Contractor’s performance and completion of the Work, and Contractor must diligently prosecute the Work and complete it within the Contract Time.
(A) General. Contractor must commence the Work on the date indicated in the Notice to Proceed and must fully complete the Work in strict compliance with all requirements of the Contract Documents and within the Contract Time. Contractor may not begin performing the Work before the date specified in the Notice to Proceed.
(B) Authorization. Contractor is not entitled to compensation or credit for any Work performed before the date specified in the Notice to Proceed, with the exception of any schedules, submittals, or other requirements, if any, that must be provided or performed before issuance of the Notice to Proceed.
(C) Rate of Progress. Contractor and its Subcontractors must, at all times, provide workers, materials, and equipment sufficient to maintain the rate of progress necessary to ensure full completion of the Work within the Contract Time. If City determines that Contractor is failing to prosecute the Work at a sufficient rate of progress, City may, in its sole discretion, direct Contractor to provide additional workers, materials, or equipment, or to work additional hours or days without additional cost to City, in order to achieve a rate of progress satisfactory to City. If Contractor fails to comply with City’s directive in this regard, City may, at Contractor’s expense, separately contract for additional workers, materials, or equipment or use City’s own forces to achieve the necessary rate of progress. Alternatively, City may terminate the Contract based on Contractor’s default.
5.2 Schedule Requirements. Contractor must prepare all schedules using standard, commercial scheduling software acceptable to the Engineer, and must provide the schedules in electronic and paper form as requested by the Engineer. In addition to the general scheduling requirements set forth below, Contractor must also comply with any scheduling requirements included in the Special Conditions or in the Technical Specifications.
(A) Baseline (As-Planned) Schedule. Within ten calendar days following City’s issuance of the Notice to Proceed (or as otherwise specified in the Notice to Proceed), Contractor must submit to City for review and acceptance a baseline (as-planned) schedule using critical path methodology showing in detail how Contractor plans to perform and fully complete the Work within the Contract Time, including labor, 187
CC 03-18-2025
187 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 51
equipment, materials, and fabricated items. The baseline schedule must show the order of the major items of Work and the dates of start and completion of each item, including when the materials and equipment will be procured. The schedule must also include the work of all trades, reflecting anticipated labor or crew hours and equipment loading for the construction activities, and must be sufficiently comprehensive and detailed to enable progress to be monitored on a day-by-day basis. For each activity, the baseline schedule must be dated, provided in the format specified in the Contract Documents or as required by City, and must include, at a minimum, a description of the activity, the start and completion dates of the activity, and the duration of the activity.
(1) Specialized Materials Ordering. Within five calendar days following issuance of the Notice to Proceed, Contractor must order any specialized material or equipment for the Work that is not readily available from material suppliers.
Contractor must also retain documentation of the purchase order date(s).
(B) City’s Review of Schedules. City will review and may note exceptions to the baseline schedule, and to the progress schedules submitted as required below, to assure completion of the Work within the Contract Time. Contractor is solely responsible for resolving any exceptions noted in a schedule and, within seven days, must correct the schedule to address the exceptions. City’s review or acceptance of Contractor’s schedules will not operate to waive or limit Contractor’s duty to complete the Project within the Contract Time, nor to waive or limit City’s right to assess liquidated damages for Contractor’s unexcused failure to do so.
(C) Progress Schedules. After City accepts the final baseline schedule with no exceptions, Contractor must submit an updated progress schedule and three-week look- ahead schedule, in the format specified by City, for review and acceptance with each application for a progress payment, or when otherwise specified by City, until completion of the Work. The updated progress schedule must: show how the actual progress of the Work as constructed to date compares to the baseline schedule; reflect any proposed changes in the construction schedule or method of operations, including to achieve Project milestones within the Contract Time; and identify any actual or potential impacts to the critical path. Contractor must also submit periodic reports to City of any changes in the projected material or equipment delivery dates for the Project.
(1) Float. The progress schedule must show early and late completion dates for each task. The number of days between those dates will be designated as the “float.” Any float belongs to the Project and may be allocated by the Engineer to best serve timely completion of the Project.
(2) Failure to Submit Schedule. Reliable, up-to-date schedules are essential to efficient and cost-effective administration of the Project and timely completion. If Contractor fails to submit a schedule within the time periods specified in this Section, or submits a schedule to which City has noted exceptions that are not corrected, City may withhold up to five percent from payment(s) otherwise due to Contractor until the exceptions are resolved, the schedule is corrected and resubmitted, and City has accepted the schedule. In addition, Contractor’s failure to comply with the schedule requirements in this Section 5.2 will be deemed a material default and a waiver of any claims for Excusable Delay or loss of productivity arising during any period when Contractor is out of compliance, subject only to the limits of Public Contract Code § 7102.
(D) Recovery Schedule. If City determines that the Work is more than one week behind schedule, within seven days following written notice of such determination, Contractor must submit a recovery schedule, showing how Contractor intends to perform and complete the Work within the Contract Time, based on actual progress to date. 188
CC 03-18-2025
188 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 52
(E) Effect of Acceptance. Contractor and its Subcontractors must perform the Work in accordance with the most current City-accepted schedule unless otherwise directed by City. City’s acceptance of a schedule does not operate to extend the time for completion of the Work or any component of the Work, and will not affect City’s right to assess liquidated damages for Contractor’s unexcused delay in completing the Work within the Contract Time.
(F) Posting. Contractor must at all times prominently post a copy of the most current City-accepted progress or recovery schedule in its on-site office.
(G) Reservation of Rights. City reserves the right to direct the sequence in which the Work must be performed or to make changes in the sequence of the Work in order to facilitate the performance of work by City or others, or to facilitate City’s use of its property. The Contract Time or Contract Price may be adjusted to the extent such changes in sequence actually increase or decrease Contractor’s time or cost to perform the Work.
(H) Authorized Working Days and Times. Contractor is limited to working Monday through Friday, excluding holidays, during City’s normal business hours, except as provided in the Special Conditions or as authorized in writing by City. City reserves the right to charge Contractor for additional costs incurred by City due to Work performed on days or during hours not expressly authorized in the Contract Documents, including reimbursement of costs incurred for inspection, testing, and construction management services.
5.3 Delay and Extensions of Contract Time.
(A) Notice of Delay. If Contractor becomes aware of any actual or potential delay affecting the critical path, Contractor must promptly notify the Engineer in writing, regardless of the nature or cause of the delay, so that City has a reasonable opportunity to mitigate or avoid the delay.
(B) Excusable Delay. The Contract Time may be extended if Contractor encounters “Excusable Delay,” which is an unavoidable delay in completing the Work within the Contract Time due to causes completely beyond Contractor’s control, and which Contractor could not have avoided or mitigated through reasonable care, planning, foresight, or diligence, provided that Contractor is otherwise fully performing its obligations under the Contract Documents. Grounds for Excusable Delay may include fire, natural disasters including earthquake or unusually severe weather, acts of terror or vandalism, epidemic, unforeseeable adverse government actions, unforeseeable actions of third parties, encountering unforeseeable hazardous materials, unforeseeable site conditions, or suspension for convenience under Article 13. The Contract Time will not be extended based on circumstances which will not unavoidably delay completing the Work within the Contract Time based on critical path analysis.
(C) Weather Delays. A “Weather Delay Day” is a Working Day during which Contractor and its forces, including Subcontractors, are unable to perform more than 40% of the critical path Work scheduled for that day due to adverse weather conditions which impair the ability to safely or effectively perform the scheduled critical path Work that day.
Adverse weather conditions may include rain, saturated soil, and Project site clean-up required due to adverse weather. Determination of what constitutes critical path Work scheduled for that day will be based on the most current, City-approved schedule.
Contractor will be entitled to a non-compensable extension of the Contract Time for each Weather Delay Day in excess of the normal Weather Delay Days within a given month as 189
CC 03-18-2025
189 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 53
determined by reliable records, including monthly rainfall averages, for the preceding ten years (or as otherwise specified in the Special Conditions or Specifications).
(1) Contractor must fully comply with the applicable procedures in Articles 5 and 6 of the General Conditions regarding requests to modify the Contract Time.
(2) Contractor will not be entitled to an extension of time for a Weather Delay Day to the extent Contractor is responsible for concurrent delay on that day.
(3) Contractor must take reasonable steps to mitigate the consequences of Weather Delay Days, including prudent workforce management and protecting the Work, Project Site, materials, and equipment.
(D) Non-Excusable Delay. Delay which Contractor could have avoided or mitigated through reasonable care, planning, foresight, or diligence is “Non-Excusable Delay.” Contractor is not entitled to an extension of Contract Time or any compensation for Non- Excusable Delay, or for Excusable Delay that is concurrent with Non-Excusable Delay.
Non-Excusable Delay includes delay caused by:
(1) weather conditions which are normal for the location of the Project, as determined by reliable records, including monthly rainfall averages, for the preceding ten years;
(2) Contractor’s failure to order equipment and materials sufficiently in advance of the time needed for completion of the Work within the Contract Time;
(3) Contractor’s failure to provide adequate notification to utility companies or agencies for connections or services necessary for completion of the Work within the Contract Time;
(4) foreseeable conditions which Contractor could have ascertained from reasonably diligent inspection of the Project site or review of the Contract Documents or other information provided or available to Contractor;
(5) Contractor’s failure, refusal, or financial inability to perform the Work within the Contract Time, including insufficient funds to pay its Subcontractors or suppliers;
(6) performance or non-performance by Contractor’s Subcontractors or suppliers;
(7) the time required to respond to excessive RFIs (see Section 2.5(G));
(8) delayed submission of required submittals, or the time required for correction and resubmission of defective submittals;
(9) time required for repair of, re-testing, or re-inspection of defective Work;
(10) enforcement of Laws by City, or outside agencies with jurisdiction over the Work; or
(11) City’s exercise or enforcement of any of its rights or Contractor’s duties pursuant to the Contract Documents, including correction of defective Work, extra inspections or testing due to non-compliance with Contract requirements, safety compliance, environmental compliance, or rejection and return of defective or deficient submittals.
190
CC 03-18-2025
190 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 54
(E) Compensable Delay. Pursuant to Public Contract Code § 7102, in addition to entitlement to an extension of Contract Time, Contractor is entitled to compensation for costs incurred due to delay caused solely by City, when that delay is unreasonable under the circumstances involved and not within the contemplation of the parties (“Compensable Delay”). Contractor is not entitled to an extension of Contract Time or recovery of costs for Compensable Delay that is concurrent with Non-Excusable Delay.
Delay due to Weather Delay Days in excess of normal for a given month, as set forth in Section 5.3(C), is not Compensable Delay, and will only entitle Contractor to an extension of time commensurate with the time lost due to such delay.
(F) Recoverable Costs. Contractor is not entitled to compensation for Excusable Delay unless it is Compensable Delay, as defined above. Contractor is entitled to recover only the actual, direct, reasonable, and substantiated costs (“Recoverable Costs”) for each working day that the Compensable Delay prevents Contractor from proceeding with more than 50% of the critical path Work scheduled for that day, based on the most recent progress schedule accepted by City. Recoverable Costs will not include home office overhead or lost profit.
(G) Request for Extension of Contract Time or Recoverable Costs. A request for an extension of Contract Time or any associated Recoverable Costs must be submitted in writing to City within 14 calendar days of the date the delay is first encountered, even if the duration of the delay is not yet known at that time, or any entitlement to the Contract Time extension or to the Recoverable Costs will be deemed waived. In addition to complying with the requirements of this Article 5, the request must be submitted in compliance with the Change Order request procedures in Article 6 below. Strict compliance with these requirements is necessary to ensure that any delay or consequences of delay may be mitigated as soon as possible, and to facilitate cost- efficient administration of the Project and timely performance of the Work. Any request for an extension of Contract Time or Recoverable Costs that does not strictly comply with all of the requirements of Article 5 and Article 6 will be deemed waived.
(1) Required Contents. The request must include a detailed description of the cause(s) of the delay and must also describe the measures that Contractor has taken to mitigate the delay and/or its effects, including efforts to mitigate the cost impact of the delay, such as by workforce management or by a change in sequencing. If the delay is still ongoing at the time the request is submitted, the request should also include Contractor’s plan for continued mitigation of the delay or its effects.
(2) Delay Days and Costs. The request must specify the number of days of Excusable Delay claimed or provide a realistic estimate if the duration of the delay is not yet known. If Contractor believes it is entitled to Recoverable Costs for Compensable Delay, the request must specify the amount and basis for the Recoverable Costs that are claimed or provide a realistic estimate if the amount is not yet known. Any estimate of delay duration or cost must be updated in writing and submitted with all required supporting documentation as soon as the actual time and cost is known. The maximum extension of Contract Time will be the number of days, if any, by which an Excusable Delay or a Compensable Delay exceeds any concurrent Non-Excusable Delay. Contractor is entitled to an extension of Contract Time, or compensation for Recoverable Costs, only if, and only to the extent that, such delay will unavoidably delay Final Completion.
(3) Supporting Documentation. The request must also include any and all supporting documentation necessary to evidence the delay and its actual impacts, including scheduling and cost impacts with a time impact analysis using 191
CC 03-18-2025
191 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 55
critical path methodology and demonstrating the unavoidable delay to Final Completion. The time impact analysis must be submitted in a form or format acceptable to City.
(4) Burden of Proof. Contractor has the burden of proving that: the delay was an Excusable Delay or Compensable Delay, as defined above; Contractor has fully complied with its scheduling obligations in Section 5.2, Schedule Requirements; Contractor has made reasonable efforts to mitigate the delay and its schedule and cost impacts; the delay will unavoidably result in delaying Final Completion; and any Recoverable Costs claimed by Contractor were actually incurred and were reasonable under the circumstances.
(5) Legal Compliance. Nothing in this Section 5.3 is intended to require the waiver, alteration, or limitation of the applicability of Public Contract Code § 7102.
(6) No Waiver. Any grant of an extension of Contract Time, or compensation for Recoverable Costs due to Compensable Delay, will not operate as a waiver of City’s right to assess liquidated damages for Non-Excusable Delay.
(7) Dispute Resolution. In the event of a dispute over entitlement to an extension of Contract Time or compensation for Recoverable Costs, Contractor may not stop Work pending resolution of the dispute, but must continue to comply with its duty to diligently prosecute the performance and timely completion of the Work.
Contractor’s sole recourse for an unresolved dispute based on City’s rejection of a Change Order request for an extension of Contract Time or compensation for Recoverable Costs is to comply with the dispute resolution provisions set forth in Article 12 below.
5.4 Liquidated Damages. It is expressly understood that if Final Completion is not achieved within the Contract Time, City will suffer damages from the delay that are difficult to determine and accurately specify. Pursuant to Public Contract Code § 7203, if Contractor fails to achieve Final Completion within the Contract Time due to Contractor’s Non- Excusable Delay, City will charge Contractor in the amount specified in the Contract for each calendar day that Final Completion is delayed beyond the Contract Time, as liquidated damages and not as a penalty. Any waiver of accrued liquidated damages, in whole or in part, is subject to approval of the City Council or its authorized delegee.
(A) Liquidated Damages. Liquidated damages will not be assessed for any Excusable Delay or Compensable Delay, as set forth above.
(B) Milestones. Liquidated damages may also be separately assessed for failure to meet milestones specified elsewhere in the Contract Documents.
(C) Setoff. City is entitled to deduct the amount of liquidated damages assessed against any payments otherwise due to Contractor, including progress payments, Final Payment, or unreleased retention. If there are insufficient Contract funds remaining to cover the full amount of liquidated damages assessed, City is entitled to recover the balance from Contractor or its performance bond surety.
(D) Occupancy or Use. Occupancy or use of the Project in whole or in part prior to Final Completion does not constitute City’s acceptance of the Project and will not operate as a waiver of City’s right to assess liquidated damages for Contractor’s Non-Excusable Delay in achieving Final Completion.
(E) Other Remedies. City’s right to liquidated damages under this Section applies only to damages arising from Contractor’s Non-Excusable Delay or failure to complete 192
CC 03-18-2025
192 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 56
the Work within the Contract Time. City retains its right to pursue all other remedies under the Contract for other types of damage, including damage to property or persons, costs or diminution in value from defective materials or workmanship, costs to repair or complete the Work, or other liability caused by Contractor.
Article 6 - Contract Modification
6.1 Contract Modification. Subject to the limited exception set forth in subsection (D) below, any change in the Work or the Contract Documents, including the Contract Price or Contract Time, will not be a valid and binding change to the Contract unless it is formalized in a Change Order, including a “no-cost” Change Order or a unilateral Change Order. Changes in the Work pursuant to this Article 6 will not operate to release, limit, or abridge Contractor’s warranty obligations pursuant to Article 11 or any obligations of Contractor’s bond sureties.
(A) City-Directed Changes. City may direct changes in the scope or sequence of Work or the requirements of the Contract Documents, without invalidating the Contract.
Such changes may include Extra Work as set forth in subsection (C) below, or deletion or modification of portions of the Work. Contractor must promptly comply with City-directed changes in the Work in accordance with the original Contract Documents, even if Contractor and City have not yet reached agreement as to adjustments to the Contract Price or Contract Time for the change in the Work or for the Extra Work. Contractor is not entitled to extra compensation for cost savings resulting from “value engineering” pursuant to Public Contract Code § 7101, except to the extent authorized in advance by City in writing, and subject to any applicable procedural requirements for submitting a proposal for value engineering cost savings.
(B) Disputes. In the event of a dispute over entitlement to or the amount of a change in Contract Time or a change in Contract Price related to a City-directed change in the Work, Contractor must perform the Work as directed and may not delay its Work or cease Work pending resolution of the dispute, but must continue to comply with its duty to diligently prosecute the performance and timely completion of the Work, including the Work in dispute. Likewise, in the event that City and Contractor dispute whether a portion or portions of the Work are already required by the Contract Documents or constitute Extra Work, or otherwise dispute the interpretation of any portion(s) of the Contract Documents, Contractor must perform the Work as directed and may not delay its Work or cease Work pending resolution of the dispute, but must continue to comply with its duty to diligently prosecute the performance and timely completion of the Work, including the Work in dispute, as directed by City. If Contractor refuses to perform the Work in dispute, City may, acting in its sole discretion, elect to delete the Work from the Contract and reduce the Contract Price accordingly, and self-perform the Work or direct that the Work be performed by others. Alternatively, City may elect to terminate the Contract for convenience or for cause. Contractor’s sole recourse for an unresolved dispute related to changes in the Work or performance of any Extra Work is to comply with the dispute resolution provisions set forth in Article 12, below.
(C) Extra Work. City may direct Contractor to perform Extra Work related to the Project. Contractor must promptly perform any Extra Work as directed or authorized by City in accordance with the original Contract Documents, even if Contractor and City have not yet reached agreement on adjustments to the Contract Price or Contract Time for such Extra Work. If Contractor believes it is necessary to perform Extra Work due to changed conditions, Contractor must promptly notify the Engineer in writing, specifically identifying the Extra Work and the reason(s) the Contractor believes it is Extra Work. This notification requirement does not constitute a Change Order request pursuant to Section
6.2, below. Contractor must maintain detailed daily records that itemize the cost of each 193
CC 03-18-2025
193 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 57
element of Extra Work, and sufficiently distinguish the direct cost of the Extra Work from the cost of other Work performed. For each day that Contractor performs Extra Work, or Work that Contractor contends is Extra Work, Contractor must submit no later than the following Working Day, a daily report of the Extra Work performed that day and the related costs, together with copies of certified payroll, invoices, and other documentation substantiating the costs (“Extra Work Report”). The Engineer will make any adjustments to Contractor’s Extra Work Report(s) based on the Engineer’s records of the Work. When an Extra Work Report(s) is agreed on and signed by both City and Contractor, the Extra Work Report(s) will become the basis for payment under a duly authorized and signed Change Order. Failure to submit the required documentation by close of business on the next Working Day is deemed a full and complete waiver for any change in the Contract Price or Contract Time for any Extra Work performed that day.
(D) Minor Changes and RFIs. Minor field changes, including RFI replies from City, that do not affect the Contract Price or Contract Time and that are approved by the Engineer acting within his or her scope of authority, do not require a Change Order. By executing an RFI reply from City, Contractor agrees that it will perform the Work as clarified therein, with no change to the Contract Price or Contract Time.
(E) Remedy for Non-Compliance. Contractor’s failure to promptly comply with a City-directed change is deemed a material breach of the Contract, and in addition to all other remedies available to it, City may, at its sole discretion, hire another contractor or use its own forces to complete the disputed Work at Contractor’s sole expense, and may deduct the cost from the Contract Price.
6.2 Contractor Change Order Requests. Contractor must submit a request or proposal for a change in the Work, compensation for Extra Work, or a change in the Contract Price or Contract Time as a written Change Order request or proposal.
(A) Time for Submission. Any request for a change in the Contract Price or the Contract Time must be submitted in writing to the Engineer within 14 calendar days of the date that Contractor first encounters the circumstances, information or conditions giving rise to the Change Order request, even if the total amount of the requested change in the Contract Price or impact on the Contract Time is not yet known at that time. If City requests that Contractor propose the terms of a Change Order, unless otherwise specified in City’s request, Contractor must provide the Engineer with a written proposal for the change in the Contract Price or Contract Time within five working days of receiving City’s request, in a form satisfactory to the Engineer.
(B) Required Contents. Any Change Order request or proposal submitted by Contractor must include a complete breakdown of actual or estimated costs and credits, and must itemize labor, materials, equipment, taxes, insurance, subcontract amounts, and, if applicable, Extra Work Reports. Any estimated cost must be updated in writing as soon as the actual amount is known.
(C) Required Documentation. All claimed costs must be fully documented, and any related request for an extension of time or delay-related costs must be included at that time and in compliance with the requirements of Article 5 of the General Conditions.
Upon request, Contractor must permit City to inspect its original and unaltered bidding records, subcontract agreements, subcontract change orders, purchase orders, invoices, or receipts associated with the claimed costs.
(D) Required Form. Contractor must use City’s form(s) for submitting all Change Order requests or proposals, unless otherwise specified by City.
194
CC 03-18-2025
194 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 58
(E) Certification. All Change Order requests must be signed by Contractor and must include the following certification:
“The undersigned Contractor certifies under penalty of perjury that its statements and representations in this Change Order request are true and correct. Contractor warrants that this Change Order request is comprehensive and complete as to the Work or changes referenced herein, and agrees that any known or foreseeable costs, expenses, or time extension requests not included herein, are deemed waived.”
6.3 Adjustments to Contract Price. The amount of any increase or decrease in the Contract Price will be determined based on one of the following methods listed below, in the order listed with unit pricing taking precedence over the other methods. Markup applies only to City-authorized time and material Work, and does not apply to any other payments to Contractor. For Work items or components that are deleted in their entirety, Contractor will only be entitled to compensation for those direct, actual, and documented costs (including restocking fees), reasonably incurred before Contractor was notified of the City’s intent to delete the Work, with no markup for overhead, profit, or other indirect costs.
(A) Unit Pricing. Amounts previously provided by Contractor in the form of unit prices, either in a bid schedule or in a post-award schedule of values pursuant to Section
8.1, Schedule of Values, will apply to determine the price for the affected Work, to the extent applicable unit prices have been provided for that type of Work. No additional markup for overhead, profit, or other indirect costs will be added to the calculation.
(B) Lump Sum. A mutually agreed upon, all-inclusive lump sum price for the affected Work with no additional markup for overhead, profit, or other indirect costs.
(C) Time and Materials. On a time and materials basis, if and only to the extent compensation on a time and materials basis is expressly authorized by City in advance of Contractor’s performance of the Work and subject to any not-to-exceed limit. Time and materials compensation for increased costs or Extra Work (but not decreased costs or deleted Work) will include allowed markup for overhead, profit, and other indirect costs, calculated as the total of the following sums, the cumulative total of which may not exceed the maximum markup rate of 15%:
(1) All direct labor costs provided by the Contractor, excluding superintendence, project management, or administrative costs, plus 15% markup;
(2) All direct material costs provided by the Contractor, including sales tax, plus 15% markup;
(3) All direct plant and equipment rental costs provided by the Contractor, plus 15% markup;
(4) All direct additional subcontract costs plus 10% markup for Work performed by Subcontractors; and
(5) Increased bond or insurance premium costs computed at 1.5% of the total of the previous four sums.
6.4 Unilateral Change Order. If the parties dispute the terms of a proposed Change Order, including disputes over the amount of compensation or extension of time that Contractor has requested, the value of deleted or changed Work, what constitutes Extra Work, or quantities used, City may elect to issue a unilateral Change Order, directing performance 195
CC 03-18-2025
195 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 59
of the Work, and authorizing a change in the Contract Price or Contract Time for the adjustment to compensation or time that the City believes is merited. Contractor’s sole recourse to dispute the terms of a unilateral Change Order is to submit a timely Claim pursuant to Article 12, below.
6.5 Non-Compliance Deemed Waiver. Contractor waives its entitlement to any increase in the Contract Price or Contract Time if Contractor fails to fully comply with the provisions of this Article. Contractor will not be paid for unauthorized Extra Work.
Article 7 - General Construction Provisions
7.1 Permits, Fees, Business License, and Taxes.
(A) Permits, Fees, and City Business License. Contractor must obtain and pay for all permits, fees, and licenses required to perform the Work, including a City business license. Contractor must cooperate with and provide notifications to all government agencies with jurisdiction over the Project, as may be required. Contractor must provide City with copies of all records of permits and permit applications, payment of required fees, and any licenses required for the Work.
(B) Taxes. Contractor must pay for all taxes on labor, material, and equipment, except Federal Excise Tax to the extent that City is exempt from Federal Excise Tax.
7.2 Temporary Facilities. Contractor must provide, at Contractor’s sole expense, any and all temporary facilities for the Project, including an onsite staging area for materials and equipment, a field office, sanitary facilities, utilities, storage, scaffolds, barricades, walkways, and any other temporary structure required to safely perform the Work along with any incidental utility services. The location of all temporary facilities must be approved by the City prior to installation. Temporary facilities must be safe and adequate for the intended use and installed and maintained in accordance with Laws and the Contract Documents. Contractor must fence and screen the Project site and, if applicable, any separate Worksites, including the staging area, and its operation must minimize inconvenience to neighboring properties. Additional provisions pertaining to temporary facilities may be included in the Specifications or Special Conditions.
(A) Utilities. Contractor must install and maintain the power, water, sewer, and all other utilities required for the Project site, including the piping, wiring, internet and wifi connections, and any related equipment necessary to maintain the temporary facilities.
(B) Removal and Repair. Contractor must promptly remove all such temporary facilities when they are no longer needed or upon completion of the Work, whichever comes first. Contractor must promptly repair any damage to City’s property or to other property caused by the installation, use, or removal of the temporary facilities, and must promptly restore the property to its original or intended condition.
7.3 Noninterference and Site Management. Contractor must avoid interfering with City’s use of its property at or adjacent to the Project site, including use of roadways, entrances, parking areas, walkways, and structures. Contractor must also minimize disruption of access to private property in the Project vicinity. Contractor must coordinate with affected property owners, tenants, and businesses, and maintain some vehicle and pedestrian access to their residences or properties at all times. Temporary access ramps, fencing or other measures must be provided as needed. Before blocking access to a private driveway or parking lot, Contractor must provide effective notice to the affected parties at least 48 hours in advance of the pending closure and allow them to remove vehicles. 196
CC 03-18-2025
196 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 60
Private driveways, residences and parking lots must have access to a roadway during non-Work hours.
(A) Offsite Acquisition. Unless otherwise provided by City, Contractor must acquire, use, and dispose of, at its sole expense, any Worksites, licenses, easements, and temporary facilities necessary to access and perform the Work.
(B) Offsite Staging Area and Field Office. If additional space beyond the Project site is needed, such as for the staging area or the field office, Contractor may need to make arrangements with the nearby property owner(s) to secure the space. Before using or occupying any property owned by a third party, Contractor must provide City with a copy of the necessary license agreement, easement, or other written authorization from the property owner, together with a written release from the property owner holding City harmless from any related liability, in a form acceptable to the City Attorney.
(C) Traffic Management. Contractor must provide traffic management and traffic controls as specified in the Contract Documents, as required by Laws, and as otherwise required to ensure public and worker safety, and to avoid interference with public or private operations or the normal flow of vehicular, bicycle, or pedestrian traffic.
7.4 Signs. No signs may be displayed on or about City’s property, except signage which is required by Laws or by the Contract Documents, without City’s prior written approval as to size, design, and location. Contractor must furnish and install all signs at Contractor‘s sole expense, including signs required by Laws or the Contract Documents
7.5 Project Site and Nearby Property Protections.
(A) General. Contractor is responsible at all times, on a 24-hour basis and at its sole cost, for protecting the Work, the Project site, and the materials and equipment to be incorporated into the Work, until the City has accepted the Project, excluding any exceptions to acceptance, if any. Except as specifically authorized by City, Contractor must confine its operations to the area of the Project site indicated in the Plans and Specifications. Contractor is liable for any damage caused by Contractor or its Subcontractors to the Work, City’s property, the property of adjacent or nearby property owners and the work or personal property of other contractors working for City, including damage related to Contractor’s failure to adequately secure the Work or any Worksite.
(1) Subject to City’s approval, Contractor will provide and install safeguards to protect the Work; any Worksite, including the Project site; City’s real or personal property and the real or personal property of adjacent or nearby property owners, including plant and tree protections.
(2) Cupertino Sanitary District and the City of Sunnyvale own and operate wastewater systems within City and they may not be interrupted. If the Work disrupts existing sewer facilities, Contractor must immediately notify City and establish a plan, subject to City’s approval, to convey the sewage in closed conduits back into the sanitary sewer system. Sewage must not be permitted to flow in trenches or be covered by backfill.
(3) Contractor must remove with due care, and store at City’s request, any objects or material from the Project site that City will salvage or reuse at another location.
(4) If directed by Engineer, Contractor must promptly repair or replace any property damage, as specified by the Engineer. However, acting in its sole 197
CC 03-18-2025
197 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 61
discretion, City may elect to have the property damage remedied otherwise, and may deduct the cost to repair or replace the damaged property from payment otherwise due to Contractor.
(5) Contractor will not permit any structure or infrastructure to be loaded in a manner that will damage or endanger the integrity of the structure or infrastructure.
(B) Securing Project Site. After completion of Work each day, Contractor must secure the Project site and, to the extent feasible, make the area reasonably accessible to the public unless City approves otherwise. All excess materials and equipment not protected by approved traffic control devices must be relocated to the staging area or demobilized. Trench spoils must be hauled off the Project site daily and open excavations must be protected with steel plates. Contractor and Subcontractor personnel may not occupy or use the Project site for any purpose during non-Work hours, except as may be provided in the Contract Documents or pursuant to prior written authorization from City.
(C) Unforeseen Conditions. If Contractor encounters facilities, utilities, or other unknown conditions not shown on or reasonably inferable from the Plans or apparent from inspection of the Project site, Contractor must immediately notify the City and promptly submit a Request for Information to obtain further directions from the Engineer.
Contractor must avoid taking any action which could cause damage to the facilities or utilities pending further direction from the Engineer. The Engineer’s written response will be final and binding on Contractor. If the Engineer’s subsequent direction to Contractor affects Contractor’s cost or time to perform the Work, Contractor may submit a Change Order request as set forth in Article 6 above.
(D) Support; Adjacent Properties. Contractor must provide, install, and maintain all shoring, bracing, and underpinning necessary to provide support to City’s property and adjacent properties and improvements thereon. Contractor must provide notifications to adjacent property owners as may be required by Laws. See also, Section 7.15, Trenching of Five Feet or More.
(E) Notification of Property Damage. Contractor must immediately notify the City of damage to any real or personal property resulting from Work on the Project. Contractor must immediately provide a written report to City of any such property damage in excess of $500 (based on estimated cost to repair or replace) within 24 hours of the occurrence.
The written report must include: (1) the location and nature of the damage, and the owner of the property, if known; (2) the name and address of each employee of Contractor or any Subcontractor involved in the damage; (3) a detailed description of the incident, including precise location, time, and names and contact information for known witnesses; and (4) a police or first responder report, if applicable. If Contractor is required to file an accident report with another government agency, Contractor will provide a copy of the report to City.
7.6 Materials and Equipment.
(A) General. Unless otherwise specified, all materials and equipment required for the Work must be new, free from defects, and of the best grade for the intended purpose, and furnished in sufficient quantities to ensure the proper and expeditious performance of the Work. Contractor must employ measures to preserve the specified quality and fitness of the materials and equipment. Unless otherwise specified, all materials and equipment required for the Work are deemed to include all components required for complete installation and intended operation and must be installed in accordance with the manufacturer’s recommendations or instructions. Contractor is responsible for all shipping, handling, and storage costs associated with the materials and equipment 198
CC 03-18-2025
198 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 62
required for the Work. Contractor is responsible for providing security and protecting the Work and all of the required materials, supplies, tools and equipment at Contractor’s sole cost until City has formally accepted the Project as set forth in Section 11.1, Final Completion. Contractor will not assign, sell, mortgage, or hypothecate any materials or equipment for the Project, or remove any materials or equipment that have been installed or delivered.
(B) City-Provided. If the Work includes installation of materials or equipment to be provided by City, Contractor is solely responsible for the proper examination, handling, storage, and installation in accordance with the Contract Documents. Contractor must notify City of any defects discovered in City-provided materials or equipment, sufficiently in advance of scheduled use or installation to afford adequate time to procure replacement materials or equipment as needed. Contractor is solely responsible for any loss of or damage to such items which occurs while the items are in Contractor’s custody and control, the cost of which may be offset from the Contract Price and deducted from any payment(s) due to Contractor.
(C) Existing City Equipment. Contractor will carefully remove all existing equipment from the Worksite. If the City specifies or indicates that equipment is to be salvaged and reused or to remain the property of City then the Contractor will reuse or return the equipment to the City. Contractor will store and protect salvaged equipment specified to be reused in the Work. Contractor will deliver to the City in good condition the equipment that is to remain City property but not be reused in the Work.
(1) If an item specified to be salvaged is damaged during its removal, storage, or handling through carelessness or improper procedures, then Contractor will replace that equipment in kind or with a new item. For those items specified to be salvaged Contractor may choose to instead furnish and install new equipment, in which case the original, removed items will become Contractor’s property. Existing materials and equipment removed by Contractor will only be reused in the Work if so specified or indicated by the City.
(D) Intellectual Property Rights. Contractor must, at its sole expense, obtain any authorization or license required for use of patented or copyright-protected materials, equipment, devices, or processes that are incorporated into the Work. Contractor’s indemnity obligations in Article 4 apply to any claimed violation of intellectual property rights.
(E) Certificate of Compliance. When a Certificate of Compliance is specified, or for any material or item (“material”) produced or assembled outside of the United States, Contractor must submit a Certificate of Compliance before incorporating that material into the Project. A Certificate of Compliance must be submitted for each lot of material delivered to the Project site, and in a form acceptable to the City Engineer, identifying the material, its source, and the lot. Each Certificate of Compliance must be signed by the material producer stating that the material fully complies with the applicable requirements of the Specifications. Submission of a Certificate of Compliance will not limit Contractor’s continuing obligation to use only materials that conform with the requirements of the Contract Documents. Any materials furnished pursuant to a Certificate of Compliance may be inspected or tested at any time by City, subject to the inspection and testing provisions of Article 7, and defective or non-conforming material may be rejected at any time, even if already installed.
(F) Site Materials. Except as otherwise specified, City retains full ownership of and all rights to use any water, soil, stone, gravel, sand, minerals or other materials (“Site Materials”) on City property, including the Project site, and including any site materials 199
CC 03-18-2025
199 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 63
that have been extracted, excavated, or otherwise affected or made accessible by performance of the Work. However, City, acting in its sole discretion, may provide written authorization in the Special Conditions or in the Specifications or in a Change Order for Contractor to make use of or incorporate specified Site Materials in the Work.
(G) Mined Materials. Pursuant to the Surface Mining and Reclamation Act of 1975, Public Resources Code § 2710 et seq., any purchase of mined materials, such as construction aggregate, sand, gravel, crushed stone, road base, fill materials, and any other mineral materials must originate from a surface mining operation included on the AB 3098 List, which is available online at:
ftp://ftp.consrv.ca.gov/pub/omr/AB3098%20List/AB3908List.pdf
7.7 Substitutions.
(A) “Or Equal.” Any Specification designating a material, product, or thing (collectively, “item”) or service by specific brand or trade name, followed by the words “or equal,” is intended only to indicate the quality and type of item or service desired, and Contractor may request use of any equal item or service. Unless otherwise stated in the Specifications, any reference to a specific brand or trade name for an item or service that is used solely for the purpose of describing the type of item or service desired, will be deemed to be followed by the words “or equal.” A substitution will only be approved if it is a true “equal” item or service in every aspect of design, function, and quality, as determined by City, including dimensions, weight, maintenance requirements, durability, fit with other elements, and schedule impacts.
(B) Request for Substitution. A post-award request for substitution of an item or service must be submitted in writing to the Engineer for approval in advance, within the applicable time period provided in the Contract Documents. If no time period is specified, the substitution request may be submitted any time within 35 days after the date of award of the Contract, or sufficiently in advance of the time needed to avoid delay of the Work, whichever is earlier.
(C) Substantiation. Any available data substantiating the proposed substitute as an equal item or service must be submitted with the written request for substitution.
Contractor’s failure to timely provide all necessary substantiation, including any required test results as soon as they are available, is grounds for rejection of the proposed substitution, without further review.
(D) Burden of Proving Equality. Contractor has the burden of proving the equality of the proposed substitution at Contractor’s sole cost. City has sole discretion to determine whether a proposed substitution is equal, and City’s determination is final.
(E) Approval or Rejection. If the proposed substitution is approved, Contractor is solely responsible for any additional costs or time associated with the substituted item or service. If the proposed substitution is rejected, Contractor must, without delay, install the item or use the service as specified by City.
(F) Contractor’s Obligations. City’s approval of a proposed substitution will not relieve Contractor from any of its obligations under the Contract Documents. In the event Contractor makes an unauthorized substitution, Contractor will be solely responsible for all resulting cost impacts, including the cost of removal and replacement and the impact to other design elements.
7.8 Testing and Inspection.
200
CC 03-18-2025
200 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 64
(A) General. All materials, equipment, and workmanship used in the Work are subject to inspection and testing by City at all times and at all locations during construction and/or fabrication, including at any Worksite, shops, and yards. All manufacturers’ application or installation instructions must be provided to the Inspector at least ten days prior to the first such application or installation. Contractor must, at all times, make the Work available for testing or inspection. Neither City’s inspection or testing of Work, nor its failure to do so, operate to waive or limit Contractor’s duty to complete the Work in accordance with the Contract Documents.
(B) Scheduling and Notification. Contractor must cooperate with City in coordinating the inspections and testing. Contractor must submit samples of materials, at Contractor’s expense, and schedule all tests required by the Contract Documents in time to avoid any delay to the progress of the Work. Contractor must notify the Engineer no later than noon of the Working Day before any inspection or testing and must provide timely notice to the other necessary parties as specified in the Contract Documents. If Contractor schedules an inspection or test beyond regular Work hours, or on a Saturday, Sunday, or recognized City holiday, Contractor must notify the Engineer at least two Working Days in advance for approval. If approved, Contractor must reimburse City for the cost of the overtime inspection or testing. Such costs, including the City’s hourly costs for required personnel, may be deducted from payments otherwise due to Contractor.
(C) Responsibility for Costs. City will bear the initial cost of inspection and testing to be performed by independent consultants retained by City, subject to the following exceptions:
(1) Contractor will be responsible for the costs of any subsequent inspections or tests which are required to substantiate compliance with the Contract Documents, and any associated remediation costs.
(2) Contractor will be responsible for inspection costs, at City’s hourly rates, for inspection time lost because the Work is not ready, or Contractor fails to appear for a scheduled inspection.
(3) If any portion of the Work that is subject to inspection or testing is covered or concealed by Contractor prior to the inspection or testing, Contractor will bear the cost of making that portion of the Work available for the inspection or testing required by the Contract Documents, and any associated repair or remediation costs.
(4) Contractor is responsible for properly shoring all compaction test sites deeper than five feet below grade, as required under Section 7.15 below.
(5) Any Work or material that is defective or fails to comply with the requirements of the Contract Documents must be promptly repaired, removed, replaced, or corrected by Contractor, at Contractor’s sole expense, even if that Work or material was previously inspected or included in a progress payment.
(D) Contractor’s Obligations. Contractor is solely responsible for any delay occasioned by remediation of defective or noncompliant Work or material. Inspection or testing of the Work does not in any way relieve Contractor of its obligations to perform the Work as specified. Any Work done without the inspection(s) or testing required by the Contract Documents will be subject to rejection by City.
(E) Distant Locations. If required off-site testing or inspection must be conducted at a location more than 100 miles from the Project site, Contractor is solely responsible for the additional travel costs required for testing and/or inspection at such locations. 201
CC 03-18-2025
201 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 65
(F) Plant Inspection. If specified in the Contract Documents, or upon written request by City, Contractor must use its best efforts to facilitate and arrange for City’s inspection, sampling or testing of materials or items required for the Work at the plant or facility from which the materials or items are to be obtained. Contractor’s best efforts must include contacting the producer or manufacturer on a timely basis to schedule inspection by City’s selected representative, including appropriate access and any safety equipment, all at no cost to City. The inspection must be scheduled sufficiently in advance of the planned shipping or production date to allow for alternative arrangements if the City determined that the materials or items do not meet the requirements of the Specifications. Nothing in this provision obligates City to inspect materials or items at the source plant or facility.
(F) Final Inspection. The provisions of this Section 7.8 also apply to final inspection under Article 11, Completion and Warranty Provisions.
7.9 Project Site Conditions and Maintenance. Contractor must at all times, on a 24-hour basis and at its sole cost, maintain the Project site and staging and storage areas in clean, neat, and sanitary condition and in compliance with all Laws pertaining to safety, air quality, and dust control. Adequate toilets must be provided, and properly maintained and serviced for all workers on the Project site, located in a suitably secluded area, subject to City’s prior approval. Contractor must also, on a daily basis and at its sole cost, remove and properly dispose of the debris and waste materials from the Project site.
(A) Protection of Existing Property, Structures, and Utilities. If the Specifications indicate existing above-grade and below-grade structures, drainage lines, storm drains, sewers, water, gas, electrical, phone and data cable, and other similar items or utilities known to the City, then Contractor will locate these known existing installations before proceeding with trenching or other operations which may cause damage, will maintain them in service where appropriate, and will repair any damage caused to them by the Work, at no increase in the Contract Price.
(1) Contractor may temporarily mark or paint the ground, pavement, sidewalk, or any other improvements, but must not do so in a public right-of-way or on the Project site more than 30 days prior to the commencement of excavation work performed in connection with an installation. Any mark or paint must be removed from all surfaces, including any decorative work, within 30 days of the completion of the excavation work. Contractor is responsible for any expense associated with damages caused by the Contractor’s mark or paint, including the removal thereof.
(2) Contractor will record the location and existence of pavement markers and striping prior to construction and will provide such records to the City Engineer.
Contractor will replace in-kind any permanent paving marker or striping that it removes or damages, or as marked in the Specifications, at its expense.
(B) Air Emissions Control. Contractor must not discharge smoke or other air contaminants into the atmosphere in violation of any Laws. Contractor must comply with all Laws, including the California Air Resources Board’s In-Use Off-Road Diesel-Fueled Fleets Regulation (13 CCR § 2449 et seq.).
(C) Dust and Debris. Contractor must minimize and confine dust and debris resulting from the Work. Contractor must abate dust nuisance by cleaning, sweeping, and immediately sprinkling with water excavated areas of dirt or other materials prone to cause dust, and within one hour after the Engineer notifies Contractor that an airborne nuisance exists. The Engineer may direct that Contractor provide an approved water- 202
CC 03-18-2025
202 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 66
spraying truck for this purpose. If water is used for dust control, Contractor will only use the minimum necessary. Contractor must take all necessary steps to keep waste water out of streets, gutters, or storm drains. See Section 7.19, Environmental Control. If City determines that the dust control is not adequate, City may have the work done by others and deduct the cost from the Contract Price. Contractor will immediately remove any excess excavated material from the Project site and any dirt deposited on public streets.
(D) Clean up. Before discontinuing Work in an area, Contractor must clean the area and remove all debris and waste along with the construction equipment, tools, machinery, and surplus materials.
(1) Except as otherwise specified, all excess Project materials, and the materials removed from existing improvements on the Project site with no salvage value or intended reuse by City, will be Contractor’s property.
(2) Hauling trucks and other vehicles leaving the Project site must be cleaned of exterior mud or dirt before traveling on City streets. Materials and loose debris must be delivered and loaded to prevent dropping materials or debris. Contractor must immediately remove spillage from hauling on any publicly traveled way.
Streets affected by Work on the Project must be kept clean by street sweeping.
(E) Disposal. Contractor must dispose of all Project debris and waste materials in a safe and legal manner. Contractor may not burn or bury waste materials on the Project site. Contractor will not allow any dirt, refuse, excavated material, surplus concrete or mortar, or any associated washings, to be disposed of onto streets, into manholes or into the storm drain system.
(E) Completion. At the completion of the Work, Contractor must remove from the Project site all of its equipment, tools, surplus materials, waste materials and debris, presenting a clean and neat appearance. Before demobilizing from the Project site, Contractor must ensure that all surfaces are cleaned, sealed, waxed, or finished as applicable, and that all marks, stains, paint splatters, and the like have been properly removed from the completed Work and the surrounding areas. Contractor must ensure that all parts of the construction are properly joined with the previously existing and adjacent improvements and conditions. Contractor must provide all cutting, fitting and patching needed to accomplish that requirement. Contractor must also repair or replace all existing improvements that are damaged or removed during the Work, both on and off the Project site, including curbs, sidewalks, driveways, fences, signs, landscaping, utilities, street surfaces and structures. Repairs and replacements must be at least equal to the previously existing improvements, and the condition, finish and dimensions must match the previously existing improvements. Contractor must restore to original condition all property or items that are not designated for alteration under the Contract Documents and leave each Worksite clean and ready for occupancy or use by City.
(F) Non-Compliance. If Contractor fails to comply with its maintenance and cleanup obligations or any City clean up order, City may, acting in its sole discretion, elect to suspend the Work until the condition(s) is corrected with no increase in the Contract Time or Contract Price, or undertake appropriate cleanup measures without further notice and deduct the cost from any amounts due or to become due to Contractor.
7.10 Instructions and Manuals. Contractor must provide to City one hard copy and one electronic file in PDF format of all instructions and manuals required by the Contract Documents, unless otherwise specified. These must be complete as to drawings, details, parts lists, performance data, and other information that may be required for City to easily maintain and service the materials and equipment installed for this Project.
203
CC 03-18-2025
203 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 67
(A) Submittal Requirements. The instructions and manuals, along with any required guarantees, must be delivered to City for review prior to requesting final inspection pursuant to Section 11.1(A), unless otherwise specified.
(B) Training. Contractor or its Subcontractors must train City’s personnel in the operation and maintenance of any complex equipment or systems as a condition precedent to Final Completion, if required in the Contract Documents.
7.11 As-built Drawings. Contractor and its Subcontractors must prepare and maintain at the Project site a detailed, complete and accurate as-built set of the Plans which will be used solely for the purpose of recording changes made in any portion of the original Plans in order to create accurate record drawings at the end of the Project.
(A) Duty to Update. The as-built drawings must be updated as changes occur, on a daily basis if necessary. City may withhold the estimated cost for City to have the as-built drawings prepared from payments otherwise due to Contractor, until the as-built drawings are brought up to date to the satisfaction of City. Actual locations to scale must be identified on the as-built drawings for all runs of mechanical and electrical work, including all site utilities installed underground, in walls, floors, or otherwise concealed. Deviations from the original Plans must be shown in detail. The exact location of all main runs, whether piping, conduit, ductwork or drain lines, must be shown by dimension and elevation. The location of all buried pipelines, appurtenances, or other improvements must be represented by coordinates and by the horizontal distance from visible above- ground improvements.
(B) Final Completion. Contractor must verify that all changes in the Work are depicted in the as-built drawings and must deliver the complete set of as-built drawings to the Engineer for review and acceptance as a condition precedent to Final Completion and Final Payment.
7.12 Existing Utilities.
(A) General. The Work may be performed in developed, urban areas with existing utilities, both above and below ground, including utilities identified in the Contract Documents or in other informational documents or records. Contractor must take due care to locate identified or reasonably identifiable utilities before proceeding with trenching, excavation, or any other activity that could damage or disrupt existing utilities.
This may include excavation with small equipment, potholing, or hand excavation, and, if practical, using white paint or other suitable markings to delineate the area to be excavated. Except as otherwise provided herein, Contractor will be responsible for costs resulting from damage to identified or reasonably identifiable utilities due to Contractor’s negligence or failure to comply with the Contract Documents, including the requirements in this Article 7.
(B) Unidentified Utilities. Pursuant to Government Code § 4215, if, during the performance of the Work, Contractor discovers utility facilities not identified by City in the Contract Documents, Contractor must immediately provide written notice to City and the utility. City assumes responsibility for the timely removal, relocation, or protection of existing main or trunkline utility facilities located on the Project site if those utilities are not identified in the Contract Documents. Contractor will be compensated in accordance with the provisions of the Contract Documents for the costs of locating, repairing damage not due to Contractor’s failure to exercise reasonable care, and removing or relocating utility facilities not indicated in the Plans or Specifications with reasonable accuracy, and for equipment on the Project necessarily idled during such work. Contractor will not be assessed liquidated damages for delay in completion of the Work, to the extent the delay was caused by City’s failure to provide for removal or relocation of the utility facilities. 204
CC 03-18-2025
204 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 68
7.13 Notice of Excavation. Contractor must comply with all applicable requirements in Government Code § 4216 et seq., which are incorporated by reference herein.
7.14 Trenching and Excavations of Four Feet or More. As required by Public Contract Code § 7104, if the Work includes digging trenches or other excavations that extend deeper than four feet below the surface, the provisions in this Section apply to the Work and the Project.
(A) Duty to Notify. Contractor must promptly, and before the following conditions are disturbed, provide written notice to City if Contractor finds any of the following conditions:
(1) Material that Contractor believes may be a hazardous waste, as defined in § 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with the provisions of existing Laws;
(2) Subsurface or latent physical conditions at the Project site differing from those indicated by information about the Project site made available to bidders prior to the deadline for submitting bids; or
(3) Unknown physical conditions at the Project site of any unusual nature, materially different from those ordinarily encountered and generally recognized as inherent in work of the character required by the Contract Documents.
(B) City Investigation. City will promptly investigate the conditions and if City finds that the conditions materially differ from those indicated, apparent, or reasonably inferred from information about the Project site made available to bidders, or involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of the Work, City will issue a Change Order.
(C) Disputes. In the event that a dispute arises between City and Contractor regarding any of the conditions specified in subsection (B) above, or the terms of a Change Order issued by City, Contractor will not be excused from completing the Work within the Contract Time, but must proceed with all Work to be performed under the Contract. Contractor will retain any and all rights provided either by the Contract or by Laws which pertain to the resolution of disputes between Contractor and City.
7.15 Trenching of Five Feet or More. As required by Labor Code § 6705, if the Contract Price exceeds $25,000 and the Work includes the excavation of any trench or trenches of five feet or more in depth, a detailed plan must be submitted to City for acceptance in advance of the excavation. The detailed plan must show the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation. If the plan varies from the shoring system standards, it must be prepared by a California registered civil or structural engineer. Use of a shoring, sloping, or protective system less effective than that required by the Construction Safety Orders is prohibited.
7.16 New Utility Connections. Except as otherwise specified, City will pay connection charges and meter costs for new permanent utilities required by the Contract Documents, if any. Contractor must notify City sufficiently in advance of the time needed to request service from each utility provider so that connections and services are initiated in accordance with the Project schedule.
205
CC 03-18-2025
205 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 69
7.17 Lines and Grades. Contractor is required to use any benchmark provided by the Engineer. Unless otherwise specified in the Contract Documents, Contractor must provide all lines and grades required to execute the Work. Contractor must also provide, preserve, and replace if necessary, all construction stakes required for the Project. All stakes or marks must be set by a California licensed surveyor or a California registered civil engineer. Contractor must notify the Engineer of any discrepancies found between Contractor’s staking and grading and information provided by the Contract Documents.
Upon completion, all Work must conform to the lines, elevations, and grades shown in the Plans, including any changes directed by a Change Order.
7.18 Historic or Archeological Items.
(A) Contractor’s Obligations. Contractor must ensure that all persons performing Work at the Project site are required to immediately notify the Project Manager, upon discovery of any potential historic or archeological items, including historic or prehistoric ruins, a burial ground, archaeological or vertebrate paleontological site, including fossilized footprints or other archeological, paleontological or historical feature on the Project site (collectively, “Historic or Archeological Items”).
(B) Discovery; Cessation of Work. Upon discovery of any potential Historic or Archeological Items, Work must be stopped within an 85-foot radius of the find and may not resume until authorized in writing by City. If required by City, Contractor must assist in protecting or recovering the Historic or Archeological Items, with any such assistance to be compensated as Extra Work on a time and materials basis under Article 6, Contract Modification. At City’s discretion, a suspension of Work required due to discovery of Historic or Archeological Items may be treated as Excusable Delay pursuant to Article 5, or as a suspension for convenience under Article 13.
7.19 Environmental Control. Contractor must not pollute any drainage course or its tributary inlets with fuels, oils, bitumens, acids, insecticides, herbicides or other harmful materials.
Contractor must prevent the release of any hazardous material or hazardous waste into the soil or groundwater, and prevent the unlawful discharge of pollutants into City’s storm drain system and watercourses as required below. Contractor and its Subcontractors must at all times in the performance of the Work comply with all Laws concerning pollution of waterways.
(A) Stormwater Permit. Contractor must comply with all applicable conditions of the State Water Resources Control Board National Pollutant Discharge Elimination System General Permit for Waste Discharge Requirements for Discharges of Stormwater Runoff Associated with Construction Activity (“Stormwater Permit”).
(B) Contractor’s Obligations. If required for the Work, a copy of the Stormwater Permit is on file in City’s principal administrative offices, and Contractor must comply with it without adjustment of the Contract Price or the Contract Time. Contractor must timely and completely submit required reports and monitoring information required by the conditions of the Stormwater Permit. Contractor also must comply with all other Laws governing discharge of stormwater, including applicable municipal stormwater management programs.
7.20 Noise Control. Contractor must comply with all applicable noise control Laws. Noise control requirements apply to all equipment used for the Work or related to the Work, including trucks, transit mixers or transient equipment that may or may not be owned by Contractor.
7.21 Mined Materials. Pursuant to Public Contract Code § 20676, Contractor will not purchase any sand, gravel, or other minerals for the Work from an operation subject to 206
CC 03-18-2025
206 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 70
the Surface Mining and Reclamation Act of 1975 (Public Resources Code § 2710 et seq.) unless the Contractor certifies, under penalty of perjury, that the minerals are from a mining operation included on the AB 3098 List, which may be accessed online at:
https://www.conservation.ca.gov/smgb/Pages/AB-3098-List.aspx.
Article 8 - Payment
8.1 Schedule of Values. Prior to submitting its first application for payment, Contractor must prepare and submit to the Project Manager a schedule of values apportioned to the various divisions and phases of the Work, including mobilization and demobilization. If a Bid Schedule was submitted with Contractor’s bid, the amounts in the schedule of values must be consistent with the Bid Schedule. Each line item contained in the schedule of values must be assigned a value such that the total of all items equals the Contract Price.
The items must be sufficiently detailed to enable accurate evaluation of the percentage of completion claimed in each application for payment, and the assigned value consistent with any itemized or unit pricing submitted with Contractor’s bid.
(A) Measurements for Unit Price Work. Materials and items of Work to be paid for on the basis of unit pricing will be measured according to the methods specified in the Contract Documents.
(C) Deleted or Reduced Work. Contractor will not be compensated for Work that City has deleted or reduced in scope, except for any labor, material, or equipment costs for such Work that Contractor reasonably incurred before Contractor learned that the Work could be deleted or reduced. Contractor will only be compensated for those actual, direct and documented costs incurred, and will not be entitled to any mark up for overhead or lost profits.
8.2 Progress Payments. Following the last day of each month, or as otherwise required by the Special Conditions or Specifications, Contractor will submit to the Project Manager for approval, a monthly application for payment for Work performed during the preceding month based on the estimated value of the Design Services or Construction Services performed during that preceding month.
(A) Application for Payment. Each application for payment for Construction Services must be itemized to include labor, materials, and equipment incorporated into the Work, and materials and equipment delivered to the Project site, as well as authorized and approved Change Orders. Each application for payment for Construction Services must be supported by Contractor’s schedule of values and any other substantiating data required by the Contract Documents. If requested by the Project Manager, each application for payment for Construction Services must also be accompanied by an executed Conditional Waiver and Release Upon Progress Payment, using the form specified in Civil Code § 8132 for each Subcontractor that performed Work during the period covered by that application. The application for payment for Construction Services must also include the monthly report documenting compliance with the Skilled and Trained Workforce requirements pursuant to Public Contract Code § 2602, and as specified in Section 9.6, below.
(B) Payment of Undisputed Amounts.
(1) City will pay the undisputed amount due, as certified by the Project Manager, within 30 days after Contractor has submitted a complete and accurate payment application, subject to Public Contract Code § 20104.50. City will deduct a percentage from each progress payment as retention, as set forth in Section 8.6, below, and may withhold additional amounts as set forth in Section 8.4, below.
207
CC 03-18-2025
207 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 71
(2) If required by the Project Manager, within 45 days after receipt of each payment from City for Construction Services, Contractor must submit an executed Unconditional Waiver and Release Upon Progress Payment, using the form specified in Civil Code § 8134, from each Subcontractor that has received a progress payment from Contractor following DBE’s receipt of payment from City.
8.3 Adjustment of Payment Application. City may adjust or reject the amount requested in a payment application, including application for Final Payment, in whole or in part, if the amount requested is disputed or unsubstantiated. Contractor will be notified in writing of the basis for the modification to the amount requested. City may also deduct or withhold from payment otherwise due based upon any of the circumstances and amounts listed below. Sums withheld from payment otherwise due will be released when the basis for that withholding has been remedied and no longer exists.
(A) For Contractor’s unexcused failure to perform the Work as required by the Contract Documents, including correction or completion of punch list items, City may withhold or deduct an amount based on the City’s estimated cost to correct or complete the Work.
(B) For loss or damage caused by Contractor or its Subcontractors arising out of or relating to performance of the Work or any failure to protect the Project site, City may deduct an amount based on the estimated cost to repair or replace.
(C) For Contractor’s failure to pay its Subcontractors and suppliers when payment is due, City may withhold an amount equal to the total of past due payments and may opt to pay that amount separately via joint check pursuant to Section 8.6(B), Joint Checks.
(D) For Contractor’s failure to timely correct rejected, nonconforming, or defective Work, City may withhold or deduct an amount based on the City’s estimated cost to correct or complete the Work.
(E) For any unreleased stop notice, City may withhold 125% of the amount claimed.
(F) For Contractor’s failure to submit any required schedule or schedule update in the manner specified or within the time specified in the Contract Documents, City may withhold an amount equal to five percent of the total amount requested until Contractor complies with its schedule submittal obligations.
(G) For Contractor’s failure to maintain or submit as-built documents in the manner specified or within the time specified in the Contract Documents, City may withhold or deduct an amount based on the City’s cost to prepare the as-builts.
(H) For Work performed without Shop Drawings that have been accepted by City, when accepted Shop Drawings are required before proceeding with the Work, City may deduct an amount based on the estimated cost to correct unsatisfactory Work or diminution in value.
(I) For fines, payments, or penalties assessed under the Labor Code, City may deduct from payments due to Contractor as required by Laws and as directed by the Division of Labor Standards Enforcement.
(J) For any other fines, payments, or penalties assessed against the City relating to Contractor’s acts or omissions, including violations of Laws, City may withhold or deduct such amounts from payment otherwise due to Contractor.
208
CC 03-18-2025
208 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 72
(K) For any other costs or charges that may be withheld or deducted from payments to Contractor, as provided in the Contract Documents, including liquidated damages, City may withhold or deduct such amounts from payment otherwise due to Contractor.
8.4 Early Occupancy. Neither City’s payment of progress payments nor its partial or full use or occupancy of the Project constitutes acceptance of any part of the Work.
8.5 Retention. City will retain five percent of the full amount due on each progress payment (i.e., the amount due before any withholding or deductions pursuant to Section 8.3, Adjustment of Payment Application), or the percentage stated in the Notice Inviting Bids, whichever is greater, as retention to ensure full and satisfactory performance of the Work.
Contractor is not entitled to any reduction in the rate of withholding at any time, nor to release of any retention before 35 days following City’s recordation of the Notice of Completion, subject to the terms of Public Contract Code § 7107.
(A) Substitution of Securities. As provided by Public Contract Code § 22300, Contractor may request in writing that it be allowed, at its sole expense, to substitute securities for the retention withheld by City. Any escrow agreement entered into pursuant to this provision must fully comply with Public Contract Code § 22300 and will be subject to approval as to form by City’s legal counsel. If City exercises its right to draw upon such securities in the event of default pursuant to section (7) of the statutory Escrow Agreement for Security Deposits in Lieu of Retention, pursuant to subdivision (g) of Public Contract Code § 22300 (“Escrow Agreement”), and if Contractor disputes that it is in default, its sole remedy is to comply with the dispute resolution procedures in Article 12 and the provisions therein. It is agreed that for purposes of this paragraph, an event of default includes City’s rights pursuant to these Contract Documents to withhold or deduct sums from retention, including withholding or deduction for liquidated damages, incomplete or defective Work, stop payment notices, or backcharges. It is further agreed that if any individual authorized to give or receive written notice on behalf of a party pursuant to section (10) of the Escrow Agreement are unavailable to give or receive notice on behalf of that party due to separation from employment, retirement, death, or other circumstances, the successor or delegee of the named individual is deemed to be the individual authorized to give or receive notice pursuant to section (10) of the Escrow Agreement.
(B) Release of Undisputed Retention. All undisputed retention, less any amounts that may be assessed as liquidated damages, retained for stop notices, or otherwise withheld pursuant to Section 8.3, Adjustment of Payment Application, will be released as Final Payment to Contractor no sooner than 35 days following recordation of the notice of completion, and no later than 60 days following acceptance of the Project by City’s governing body or authorized designee pursuant to Section 11.1(C), Acceptance, or, if the Project has not been accepted, no later than 60 days after the Project is otherwise considered complete pursuant to Public Contract Code § 7107(c).
8.6 Payment to Subcontractors and Suppliers. Each month, Contractor must promptly pay each Subcontractor and supplier the value of the portion of labor, materials, and equipment incorporated into the Work or delivered to the Project site by the Subcontractor or supplier during the preceding month. Such payments must be made in accordance with the requirements of Laws pertaining to such payments, and those of the Contract Documents and applicable subcontract or supplier contract.
(A) Withholding for Stop Notice. Pursuant to Civil Code § 9358, City will withhold 125% of the amount claimed by an unreleased stop notice, a portion of which may be retained by City for the costs incurred in handling the stop notice claim, including attorneys’ fees and costs, as authorized by law.
209
CC 03-18-2025
209 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 73
(B) Joint Checks. City reserves the right, acting in its sole discretion, to issue joint checks made payable to Contractor and a Subcontractor or supplier, if City determines this is necessary to ensure fair and timely payment for a Subcontractor or supplier who has provided services or goods for the Project. As a condition to release of payment by a joint check, the joint check payees may be required to execute a joint check agreement in a form provided or approved by the City Attorney’s Office. The joint check payees will be jointly and severally responsible for the allocation and disbursement of funds paid by joint check. Payment by joint check will not be construed to create a contractual relationship between City and a Subcontractor or supplier of any tier beyond the scope of the joint check agreement.
8.7 Final Payment. Contractor’s application for Final Payment must comply with the requirements for submitting an application for a progress payment as stated in Section
8.2, above. Corrections to previous progress payments, including adjustments to estimated quantities for unit priced items, may be included in the Final Payment. If Contractor fails to submit a timely application for Final Payment, City reserves the right to unilaterally process and issue Final Payment without an application from Contractor in order to close out the Project. For the purposes of determining the deadline for Claim submission pursuant to Article 12, the date of Final Payment is deemed to be the date that City acts to release undisputed retention as final payment to Contractor, or otherwise provides written notice to Contractor of Final Payment or that no undisputed funds remain available for Final Payment due to offsetting withholdings or deductions pursuant to Section 8.3, Adjustment of Payment Application. If the amount due from Contractor to City exceeds the amount of Final Payment, City retains the right to recover the balance from Contractor or its sureties.
8.8 Release of Claims. City may, at any time, require that payment of the undisputed portion of any progress payment or Final Payment be contingent upon Contractor furnishing City with a written waiver and release of all claims against City arising from or related to the portion of Work covered by those undisputed amounts subject to the limitations of Public Contract Code § 7100. Any disputed amounts may be specifically excluded from the release.
8.9 Warranty of Title. Contractor warrants that title to all work, materials, or equipment incorporated into the Work and included in a request for payment will pass over to City free of any claims, liens, or encumbrances upon payment to Contractor.
Article 9 - Labor Provisions
9.1 Discrimination Prohibited. Discrimination against any prospective or present employee engaged in the Work on grounds of race, color, ancestry, national origin, ethnicity, religion, sex, sexual orientation, age, disability, or marital status is strictly prohibited.
Contractor and its Subcontractors are required to comply with all applicable Laws prohibiting discrimination, including the California Fair Employment and Housing Act (Govt. Code § 12900 et seq.), Government Code § 11135, and Labor Code §§ 1735, 1777.5, 1777.6, and 3077.5.
9.2 Labor Code Requirements.
(A) Eight Hour Day. Pursuant to Labor Code § 1810, eight hours of labor constitute a legal day’s work under this Contract.
(B) Penalty. Pursuant to Labor Code § 1813, Contractor will forfeit to City as a penalty, the sum of $25.00 for each day during which a worker employed by Contractor or any Subcontractor is required or permitted to work more than eight hours in any one 210
CC 03-18-2025
210 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 74
calendar day or more than 40 hours per calendar week, except if such workers are paid overtime under Labor Code § 1815.
(C) Apprentices. Contractor is responsible for compliance with the requirements governing employment and payment of apprentices, as set forth in Labor Code § 1777.5, which is fully incorporated by reference.
(D) Notices. Pursuant to Labor Code § 1771.4, Contractor is required to post all job site notices prescribed by Laws.
9.3 Prevailing Wages. Each worker performing Work under this Contract that is covered under Labor Code §§ 1720, 1720.3, or 1720.9, including cleanup at the Project site, must be paid at a rate not less than the prevailing wage as defined in §§ 1771 and 1774 of the Labor Code. The prevailing wage rates are on file with the City and available online at http://www.dir.ca.gov/dlsr. Contractor must post a copy of the applicable prevailing rates at the Project site.
(A) Penalties. Pursuant to Labor Code § 1775, Contractor and any Subcontractor will forfeit to City as a penalty up to $200.00 for each calendar day, or portion thereof, for each worker paid less than the applicable prevailing wage rate. Contractor must also pay each worker the difference between the applicable prevailing wage rate and the amount actually paid to that worker.
(B) Federal Requirements. If this Project is subject to federal prevailing wage requirements in addition to California prevailing wage requirements, Contractor and its Subcontractors are required to pay the higher of the currently applicable state or federal prevailing wage rates.
9.4 Payroll Records. Contractor must comply with the provisions of Labor Code §§ 1771.4, 1776, and 1812 and all implementing regulations, which are fully incorporated by this reference, including requirements for monthly electronic submission of payroll records to the DIR.
(A) Contractor and Subcontractor Obligations. Contractor and each Subcontractor must keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed in connection with the Work. Each payroll record must contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:
(1) The information contained in the payroll record is true and correct; and
(2) Contractor or the Subcontractor has complied with the requirements of Labor Code §§ 1771, 1811, and 1815 for any Work performed by its employees on the Project.
(B) Certified Record. A certified copy of an employee’s payroll record must be made available for inspection or furnished to the employee or his or her authorized representative on request, to City, to the Division of Labor Standards Enforcement, to the Division of Apprenticeship Standards of the DIR, and as further required by the Labor Code.
(C) Enforcement. Upon notice of noncompliance with Labor Code § 1776, Contractor or Subcontractor has ten days in which to comply with the requirements of this section. If Contractor or Subcontractor fails to do so within the ten-day period, Contractor 211
CC 03-18-2025
211 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 75
or Subcontractor will forfeit a penalty of $100.00 per day, or portion thereof, for each worker for whom compliance is required, until strict compliance is achieved. Upon request by the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement, these penalties will be withheld from payments then due to Contractor.
9.5 Labor Compliance. Pursuant to Labor Code § 1771.4, the Contract for this Project is subject to compliance monitoring and enforcement by the DIR.
9.6 Skilled and Trained Workforce. Contractor and its Subcontractors of every tier must use a Skilled and Trained Workforce, to perform all Work on the Project that falls within an apprenticeable occupation in the building and construction trades. Contractor will submit a report each month to the City demonstrating compliance with this requirement during the previous calendar month. The monthly report on compliance with Skilled and Trained Workforce compliance during the previous calendar month, must be submitted with Contractor’s monthly application for progress payments.
Article 10 - Safety Provisions
10.1 Safety Precautions and Programs. Contractor and its Subcontractors are fully responsible for safety precautions and programs, and for the safety of persons and property in the performance of the Work. Contractor and its Subcontractors must at all times comply with all applicable health and safety Laws and seek to avoid injury, loss, or damage to persons or property by taking reasonable steps to protect its employees and other persons at any Worksite, materials and equipment stored on or off site, and property at or adjacent to any Worksite.
(A) Reporting Requirements. Contractor must immediately notify the City of any death, serious injury or illness resulting from Work on the Project. Contractor must immediately provide a written report to City of each recordable accident or injury occurring at any Worksite within 24 hours of the occurrence. The written report must include: (1) the name and address of the injured or deceased person; (2) the name and address of each employee of Contractor or of any Subcontractor involved in the incident; (3) a detailed description of the incident, including precise location, time, and names and contact information for known witnesses; and (4) a police or first responder report, if applicable. If Contractor is required to file an accident report with a government agency, Contractor will provide a copy of the report to City.
(B) Legal Compliance. Contractor’s safety program must comply with the applicable legal and regulatory requirements. Contractor must provide City with copies of all notices required by Laws.
(C) Contractor’s Obligations. Any damage or loss caused by Contractor arising from the Work which is not insured under property insurance must be promptly remedied by Contractor.
(D) Remedies. If City determines, in its sole discretion, that any part of the Work or Project site is unsafe, City may, without assuming responsibility for Contractor’s safety program, require Contractor or its Subcontractor to cease performance of the Work or to take corrective measures to City’s satisfaction. If Contractor fails to promptly take the required corrective measures, City may perform them and deduct the cost from the Contract Price. Contractor agrees it is not entitled to submit a Claim for damages, for an increase in Contract Price, or for a change in Contract Time based on Contractor’s compliance with City’s request for corrective measures pursuant to this provision. 212
CC 03-18-2025
212 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 76
10.2 Hazardous Materials. Unless otherwise specified in the Contract Documents, this Contract does not include the removal, handling, or disturbance of any asbestos or other Hazardous Materials. If Contractor encounters materials on the Project site that Contractor reasonably believes to be asbestos or other Hazardous Materials, and the asbestos or other Hazardous Materials have not been rendered harmless, Contractor may continue Work in unaffected areas reasonably believed to be safe, but must immediately cease work on the area affected and report the condition to City. No asbestos, asbestos-containing products or other Hazardous Materials may be used in performance of the Work.
10.3 Material Safety. Contractor is solely responsible for complying with § 5194 of Title 8 of the California Code of Regulations, including by providing information to Contractor’s employees about any hazardous chemicals to which they may be exposed in the course of the Work. A hazard communication program and other forms of warning and training about such exposure must be used. Contractor must also maintain Safety Data Sheets (“SDS”) at the Project site, as required by Laws, for materials or substances used or consumed in the performance of the Work. The SDS will be accessible and available to Contractor’s employees, Subcontractors, and City.
(A) Contractor Obligations. Contractor is solely responsible for the proper delivery, handling, use, storage, removal, and disposal of all materials brought to the Project site and/or used in the performance of the Work. Contractor must notify the Engineer if a specified product or material cannot be used safely.
(B) Labeling. Contractor must ensure proper labeling on any material brought onto the Project site so that any persons working with or in the vicinity of the material may be informed as to the identity of the material, any potential hazards, and requirements for proper handling, protections, and disposal.
10.4 Hazardous Condition. Contractor is solely responsible for determining whether a hazardous condition exists or is created during the course of the Work, involving a risk of bodily harm to any person or risk of damage to any property. If a hazardous condition exists or is created, Contractor must take all precautions necessary to address the condition and ensure that the Work progresses safely under the circumstances.
Hazardous conditions may result from, but are not limited to, use of specified materials or equipment, the Work location, the Project site condition, the method of construction, or the way any Work must be performed.
10.5 Emergencies. In an emergency affecting the safety or protection of persons, Work, or property at or adjacent to any Worksite, Contractor must take reasonable and prompt actions to prevent damage, injury, or loss, without prior authorization from the City if, under the circumstances, there is inadequate time to seek prior authorization from the City.
Article 11 - Completion and Warranty Provisions
11.1 Final Completion.
(A) Final Inspection and Punch List. When the Work required by this Contract is fully performed, Contractor must provide written notification to City requesting final inspection. The Engineer will schedule the date and time for final inspection, which must include Contractor’s primary representative for this Project and its superintendent. Based on that inspection, City will prepare a punch list of any items that are incomplete, missing, defective, incorrectly installed, or otherwise not compliant with the Contract Documents. 213
CC 03-18-2025
213 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 77
The punch list to Contractor will specify the time by which all of the punch list items must be completed or corrected. The punch list may include City’s estimated cost to complete each punch list item if Contractor fails to do so within the specified time. The omission of any non-compliant item from a punch list will not relieve Contractor from fulfilling all requirements of the Contract Documents. Contractor’s failure to complete any punch list item within the time specified in the punch list will not waive or abridge its warranty obligations for any such items that must be completed by the City or by a third party retained by the City due to Contractor’s failure to timely complete any such outstanding item.
(B) Requirements for Final Completion. Final Completion will be achieved upon completion or correction of all punch list items, as verified by City’s further inspection, and upon satisfaction of all other Contract requirements, including any commissioning required under the Contract Documents and submission of all final submittals, including instructions and manuals as required under Section 7.10, and complete, final as-built drawings as required under Section 7.11, all to City’s satisfaction.
(C) Acceptance. The Project will be considered accepted upon City Council action during a public meeting to accept the Project, unless the Engineer is authorized to accept the Project, in which case the Project will be considered accepted upon the date of the Engineer’s issuance of a written notice of acceptance. In order to avoid delay of Project close out, the City may elect, acting in its sole discretion, to accept the Project as complete subject to exceptions for punch list items that are not completed within the time specified in the punch list.
(D) Final Payment and Release of Retention. Final Payment and release of retention, less any sums withheld pursuant to the provisions of the Contract Documents, will not be made sooner than 35 days after recordation of the notice of completion. If Contractor fails to complete all of the punch list items within the specified time, City may withhold up to 150% of City’s estimated cost to complete each of the remaining items from Final Payment and may use the withheld retention to pay for the costs to self- perform the outstanding items or to retain a third party to complete any such outstanding punch list item.
11.2 Warranty.
(A) General. Contractor warrants that all materials and equipment will be new unless otherwise specified, of good quality, in conformance with the Contract Documents, and free from defective workmanship and materials. Contractor further warrants that the Work will be free from material defects not intrinsic in the design or materials required in the Contract Documents. Contractor warrants that materials or items incorporated into the Work comply with the requirements and standards in the Contract Documents, including compliance with Laws, and that any Hazardous Materials encountered or used were handled as required by Laws. At City’s request, Contractor must furnish satisfactory evidence of the quality and type of materials and equipment furnished. Contractor’s warranty does not extend to damage caused by normal wear and tear, or improper use or maintenance.
(B) Warranty Period. Contractor’s warranty must guarantee its Work for a period of one year from the date of Project acceptance (the “Warranty Period”), except when a longer guarantee is provided by a supplier or manufacturer or is required by the Specifications or Special Conditions. Contractor must obtain from its Subcontractors, suppliers and manufacturers any special or extended warranties required by the Contract Documents.
214
CC 03-18-2025
214 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 78
(C) Warranty Documents. As a condition precedent to Final Completion, Contractor must supply City with all warranty and guarantee documents relevant to equipment and materials incorporated into the Work and guaranteed by their suppliers or manufacturers.
(D) Subcontractors. The warranty obligations in the Contract Documents apply to Work performed by Contractor and its Subcontractors, and Contractor agrees to be co- guarantor of such Work.
(E) Contractor’s Obligations. Upon written notice from City to Contractor of any defect in the Work discovered during the Warranty Period, Contractor or its responsible Subcontractor must promptly correct the defective Work at its own cost. Contractor’s obligation to correct defects discovered during the Warranty Period will continue past the expiration of the Warranty Period as to any defects in Work for which Contractor was notified prior to expiration of the Warranty Period. Work performed during the Warranty Period (“Warranty Work”) will be subject to the warranty provisions in this Section 11.2 for a one-year period that begins upon completion of such Warranty Work to City’s satisfaction.
(F) City’s Remedies. If Contractor or its responsible Subcontractor fails to correct defective Work within ten days following notice by City, or sooner if required by the circumstances, City may correct the defects to conform with the Contract Documents at Contractor’s sole expense. Contractor must reimburse City for its costs in accordance with subsection (H), below.
(G) Emergency Repairs. In cases of emergency where any delay in correcting defective Work could cause harm, loss or damage, City may immediately correct the defects to conform with the Contract Documents at Contractor’s sole expense. Contractor or its surety must reimburse City for its costs in accordance with subsection (H), below.
(H) Reimbursement. Contractor must reimburse City for its costs to repair under subsections (F) or (G), above, within 30 days following City’s submission of a demand for payment pursuant to this provision. If City is required to initiate legal action to compel Contractor’s compliance with this provision, and City is the prevailing party in such action, Contractor and its surety are solely responsible for all of City’s attorney’s fees and legal costs expended to enforce Contractor’s warranty obligations herein, in addition to any and all costs City incurs to correct the defective Work.
11.3 Use Prior to Final Completion. City reserves the right to occupy or make use of the Project, or any portions of the Project, prior to Final Completion if City has determined that the Project or portion of it is in a condition suitable for the proposed occupation or use, and that it is in its best interest to occupy or make use of the Project, or any portions of it, prior to Final Completion. City will notify Contractor in writing of its intent to occupy or make use of the Project or any portions of the Project, pursuant to this provision.
(A) Non-Waiver. Occupation or use of the Project, in whole or in part, prior to Final Completion will not operate as acceptance of the Work or any portion of it, nor will it operate as a waiver of any of City’s rights or Contractor’s duties pursuant to these Contract Documents, and will not affect nor bear on the determination of the time of substantial completion with respect to any statute of repose pertaining to the time for filing an action for construction defect.
(B) City’s Responsibility. City will be responsible for the cost of maintenance and repairs due to normal wear and tear with respect to those portions of the Project that are being occupied or used before Final Completion. The Contract Price or the Contract Time may be adjusted pursuant to the applicable provisions of these Contract Documents if, 215
CC 03-18-2025
215 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 79
and only to the extent that, any occupation or use under this Section actually adds to Contractor’s cost or time to complete the Work within the Contract Time.
11.4 Substantial Completion. For purposes of determining “substantial completion” with respect to any statute of repose pertaining to the time for filing an action for construction defect, “substantial completion” is deemed to mean the last date that Contractor or any Subcontractor performs Work on the Project prior to City acceptance of the Project, except for warranty work performed under this Article.
Article 12 - Dispute Resolution
12.1 Claims. This Article applies to and provides the exclusive procedures for any Claim arising from or related to the Contract or performance of the Work.
(A) Limitations. A Claim may only include the portion of a previously rejected demand that remains in dispute between Contractor and City. With the exception of any dispute regarding the amount of money actually paid to Contractor as Final Payment, Contractor is not entitled to submit a Claim demanding a change in the Contract Time or the Contract Price, which has not previously been submitted to City in full compliance with Article 5 and Article 6, and subsequently rejected in whole or in part by City.
(B) Scope of Article. This Article is intended to provide the exclusive procedures for submission and resolution of Claims of any amount and applies in addition to the provisions of Public Contract Code § 9204 and § 20104 et seq., which are incorporated by reference herein.
(C) No Work Delay. Notwithstanding the submission of a Claim or any other dispute between the parties related to the Project or the Contract Documents, Contractor must perform the Work and may not delay or cease Work pending resolution of a Claim or other dispute, but must continue to diligently prosecute the performance and timely completion of the Work, including the Work pertaining to the Claim or other dispute.
(D) Informal Resolution. Contractor will make a good faith effort to informally resolve a dispute before initiating a Claim, preferably by face-to-face meeting between authorized representatives of Contractor and City.
12.2 Claims Submission. The following requirements apply to any Claim subject to this Article:
(A) Substantiation. The Claim must be submitted to City in writing by registered or certified mail with return receipt requested and clearly identified as a “Claim” submitted pursuant to this Article 12. The Claim must include all of the documents necessary to substantiate the Claim including the Change Order request that was rejected in whole or in part, and a copy of City’s written rejection that is in dispute. The Claim must clearly identify and describe the dispute, including relevant references to applicable portions of the Contract Documents, and a chronology of relevant events. Any Claim for additional payment must include a complete, itemized breakdown of all known or estimated labor, materials, taxes, insurance, and subcontract, or other costs. Substantiating documentation such as payroll records, receipts, invoices, or the like, must be submitted in support of each component of claimed cost. Any Claim for an extension of time or delay costs must be substantiated with a schedule analysis and narrative depicting and explaining claimed time impacts.
(B) Claim Format and Content. A Claim must be submitted in the following format:
216
CC 03-18-2025
216 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 80
(1) Provide a cover letter, specifically identifying the submission as a “Claim” submitted under this Article 12 and specifying the requested remedy (e.g., amount of proposed change to Contract Price and/or change to Contract Time).
(2) Provide a summary of each Claim, including underlying facts and the basis for entitlement, and identify each specific demand at issue, including the specific Change Order request (by number and submittal date), and the date of City's rejection of that demand, in whole or in part.
(3) Provide a detailed explanation of each issue in dispute. For multiple issues included within a single Claim or for multiple Claims submitted concurrently, separately number and identify each individual issue or Claim, and include the following for each separate issue or Claim:
a. A succinct statement of the matter in dispute, including Contractor’s position and the basis for that position;
b. Identify and attach all documents that substantiate the Claim, including relevant provisions of the Contract Documents, RFIs, calculations, and schedule analysis (see subsection (A), Substantiation, above);
c. A chronology of relevant events; and
d. Analysis and basis for claimed changes to Contract Price, Contract Time, or any other remedy requested.
(4) Provide a summary of issues and corresponding claimed damages. If, by the time of the Claim submission deadline (below), the precise amount of the requested change in the Contract Price or Contract Time is not yet known, Contractor must provide a good faith estimate, including the basis for that estimate, and must identify the date by which it is anticipated that the Claim will be updated to provide final amounts.
(5) Include the following certification, executed by Contractor’s authorized representative:
“The undersigned Contractor certifies under penalty of perjury that its statements and representations in this Claim submittal are true and correct. Contractor warrants that this Claim submittal is comprehensive and complete as to the matters in dispute, and agrees that any costs, expenses, or delay not included herein are deemed waived.”
217
CC 03-18-2025
217 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 81
(C) Submission Deadlines.
(1) A Claim disputing rejection of a request for a change in the Contract Time or Contract Price must be submitted within 21 days following the date that City notified Contractor in writing that a request for a change in the Contract Time or Contract Price, duly submitted in compliance with Article 5 and Article 6, has been rejected in whole or in part. A Claim disputing the terms of a unilateral Change Order must be submitted within 21 days following the date of issuance of the unilateral Change Order. These Claim deadlines apply even if Contractor cannot yet quantify the total amount of any requested change in the Contract Time or Contract Price. If the Contractor cannot quantify those amounts, it must submit an estimate of the amounts claimed pending final determination of the requested remedy by Contractor.
(2) With the exception of any dispute regarding the amount of Final Payment, any Claim must be filed on or before the date of Final Payment or will be deemed waived.
(3) A Claim disputing the amount of Final Payment must be submitted within 21 days of the effective date of Final Payment, under Section 8.7, Final Payment.
(4) Strict compliance with these Claim submission deadlines is necessary to ensure that any dispute may be mitigated as soon as possible, and to facilitate cost-efficient administration of the Project. Any Claim that is not submitted within the specified deadlines will be deemed waived by Contractor.
12.3 City’s Response. City will respond within 45 days of receipt of the Claim with a written statement identifying which portion(s) of the Claim are disputed, unless the 45-day period is extended by mutual agreement of City and Contractor or as otherwise allowed under Public Contract Code § 9204. However, if City determines that the Claim is not adequately substantiated pursuant to Section 12.2(A), Substantiation, City may first request in writing, within 30 days of receipt of the Claim, any additional documentation supporting the Claim or relating to defenses to the Claim that City may have against the Claim.
(A) Additional Information. If additional information is thereafter required, it may be requested and provided upon mutual agreement of City and Contractor. If Contractor’s Claim is based on estimated amounts, Contractor has a continuing duty to update its Claim as soon as possible with information on actual amounts in order to facilitate prompt and fair resolution of the Claim.
(B) Non-Waiver. Any failure by City to respond within the times specified above will not be construed as acceptance of the Claim, in whole or in part, or as a waiver of any provision of these Contract Documents.
12.4 Meet and Confer. If Contractor disputes City’s written response, or City fails to respond within the specified time, within 15 days of receipt of City’s response or within 15 days of City’s failure to respond within the applicable 45-day time period under Section 12.3, respectively, Contractor may notify City of the dispute in writing sent by registered or certified mail, return receipt requested, and demand an informal conference to meet and confer for settlement of the issues in dispute. If Contractor fails to notify City of the dispute and demand an informal conference to meet and confer in writing within the specified time, Contractor’s Claim will be deemed waived.
(A) Schedule Meet and Confer. Upon receipt of the demand to meet and confer, City will schedule the meet and confer conference to be held within 30 days, or later if 218
CC 03-18-2025
218 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 82
needed to ensure the mutual availability of each of the individuals that each party requires to represent its interests at the meet and confer conference.
(B) Location for Meet and Confer. The meet and confer conference will be scheduled at a location at or near City’s principal office.
(C) Written Statement After Meet and Confer. Within ten working days after the meet and confer has concluded, City will issue a written statement identifying which portion(s) of the Claim remain in dispute, if any.
(D) Submission to Mediation. If the Claim or any portion remains in dispute following the meet and confer conference, within ten working days after the City issues the written statement identifying any portion(s) of the Claim remaining in dispute, the Contractor may identify in writing disputed portion(s) of the Claim, which will be submitted for mediation, as set forth below.
12.5 Mediation and Government Code Claims.
(A) Mediation. Within ten working days after the City issues the written statement identifying any portion(s) of the Claim remaining in dispute following the meet and confer, City and Contractor will mutually agree to a mediator, as provided under Public Contract Code § 9204. Mediation will be scheduled to ensure the mutual availability of the selected mediator and all of the individuals that each party requires to represent its interests. If there are multiple Claims in dispute, the parties may agree to schedule the mediation to address all outstanding Claims at the same time. The parties will share the costs of the mediator and mediation fees equally, but each party is otherwise solely and separately responsible for its own costs to prepare for and participate in the mediation, including costs for its legal counsel or any other consultants.
(B) Government Code Claims.
(1) Timely presentation of a Government Code Claim is a condition precedent to filing any legal action based on or arising from the Contract. Compliance with the Claim submission requirements in this Article 12 is a condition precedent to filing a Government Code Claim.
(2) The time for filing a Government Code Claim will be tolled from the time Contractor submits its written Claim pursuant to Section 12.2, above, until the time that Claim is denied in whole or in part at the conclusion of the meet and confer process, including any period of time used by the meet and confer process. However, if the Claim is submitted to mediation, the time for filing a Government Code Claim will be tolled until conclusion of the mediation, including any continuations, if the Claim is not fully resolved by mutual agreement of the parties during the mediation or any continuation of the mediation.
12.6 Tort Claims. This Article does not apply to tort claims and nothing in this Article is intended nor will be construed to change the time periods for filing tort-based Government Code Claims.
12.7 Arbitration. It is expressly agreed, under Code of Civil Procedure § 1296, that in any arbitration to resolve a dispute relating to this Contract, the arbitrator’s award must be supported by law and substantial evidence.
12.8 Burden of Proof and Limitations. Contractor bears the burden of proving entitlement to and the amount of any claimed damages. Contractor is not entitled to damages calculated on a total cost basis, but must prove actual damages. Contractor is not entitled 219
CC 03-18-2025
219 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 83
to speculative, special, or consequential damages, including home office overhead or any form of overhead not directly incurred at the Project site or any other Worksite; lost profits; loss of productivity; lost opportunity to work on other projects; diminished bonding capacity; increased cost of financing for the Project; extended capital costs; non- availability of labor, material or equipment due to delays; or any other indirect loss arising from the Contract. The Eichleay Formula or similar formula will not be used for any recovery under the Contract. The City will not be directly liable to any Subcontractor or supplier.
12.9 Legal Proceedings. In any legal proceeding that involves enforcement of any requirements of the Contract Documents, the finder of fact will receive detailed instructions on the meaning and operation of the Contract Documents, including conditions, limitations of liability, remedies, claim procedures, and other provisions bearing on the defenses and theories of liability. Detailed findings of fact will be requested to verify enforcement of the Contract Documents. All of the City’s remedies under the Contract Documents will be construed as cumulative, and not exclusive, and the City reserves all rights to all remedies available under law or equity as to any dispute arising from or relating to the Contract Documents or performance of the Work.
12.10 Other Disputes. The procedures in this Article 12 will apply to any and all disputes or legal actions, in addition to Claims, arising from or related to this Contract, including disputes regarding suspension or early termination of the Contract, unless and only to the extent that compliance with a procedural requirement is expressly and specifically waived by City. Nothing in this Article is intended to delay suspension or termination under Article
13. Article 13 - Suspension and Termination
13.1 Suspension for Cause. In addition to all other remedies available to City, if Contractor fails to perform or correct Work in accordance with the Contract Documents, including non-compliance with applicable environmental or health and safety Laws, City may immediately order the Work, or any portion of it, suspended until the circumstances giving rise to the suspension have been eliminated to City’s satisfaction.
(A) Notice of Suspension. Upon receipt of City’s written notice to suspend the Work, in whole or in part, except as otherwise specified in the notice of suspension, Contractor and its Subcontractors must promptly stop Work as specified in the notice of suspension; comply with directions for cleaning and securing the Worksite; and protect the completed and in-progress Work and materials. Contractor is solely responsible for any damages or loss resulting from its failure to adequately secure and protect the Project.
(B) Resumption of Work. Upon receipt of the City’s written notice to resume the suspended Work, in whole or in part, except as otherwise specified in the notice to resume, Contractor and its Subcontractors must promptly re-mobilize and resume the Work as specified; and within ten days from the date of the notice to resume, Contractor must submit a recovery schedule, prepared in accordance with the Contract Documents, showing how Contractor will complete the Work within the Contract Time.
(C) Failure to Comply. Contractor will not be entitled to an increase in the Contract Time or Contract Price for a suspension occasioned by Contractor’s failure to comply with the Contract Documents.
220
CC 03-18-2025
220 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 84
(D) No Duty to Suspend. City’s right to suspend the Work will not give rise to a duty to suspend the Work, and City’s failure to suspend the Work will not constitute a defense to Contractor’s failure to comply with the requirements of the Contract Documents.
13.2 Suspension for Convenience. City reserves the right to suspend, delay, or interrupt the performance of the Work in whole or in part, for a period of time determined to be appropriate for City’s convenience. Upon notice by City pursuant to this provision, Contractor must immediately suspend, delay, or interrupt the Work and secure the Project site as directed by City except for taking measures to protect completed or in- progress Work as directed in the suspension notice, and subject to the provisions of Section 13.1(A) and (B), above. If Contractor submits a timely request for a Change Order in compliance with Articles 5 and 6, the Contract Price and the Contract Time will be equitably adjusted by Change Order pursuant to the terms of Articles 5 and 6 to reflect the cost and delay impact occasioned by such suspension for convenience, except to the extent that any such impacts were caused by Contractor’s failure to comply with the Contract Documents or the terms of the suspension notice or notice to resume. However, the Contract Time will only be extended if the suspension causes or will cause unavoidable delay in Final Completion. If Contractor disputes the terms of a Change Order issued for such equitable adjustment due to suspension for convenience, its sole recourse is to comply with the Claim procedures in Article 12.
13.3 Termination for Default. City may declare that Contractor is in default of the Contract for a material breach of or inability to fully, promptly, or satisfactorily perform its obligations under the Contract.
(A) Default. Events giving rise to a declaration of default include Contractor’s refusal or failure to supply sufficient skilled workers, proper materials, or equipment to perform the Work within the Contract Time; Contractor’s refusal or failure to make prompt payment to its employees, Subcontractors, or suppliers or to correct defective Work or damage; Contractor’s failure to comply with Laws, or orders of any public agency with jurisdiction over the Project; evidence of Contractor’s bankruptcy, insolvency, or lack of financial capacity to complete the Work as required within the Contract Time; suspension, revocation, or expiration and nonrenewal of Contractor’s license or DIR registration; dissolution, liquidation, reorganization, or other major change in Contractor’s organization, ownership, structure, or existence as a business entity; unauthorized assignment of Contractor’s rights or duties under the Contract; or any material breach of the Contract requirements.
(B) Notice of Default and Opportunity to Cure. Upon City’s declaration that Contractor is in default due to a material breach of the Contract Documents, if City determines that the default is curable, City will afford Contractor the opportunity to cure the default within ten days of City’s notice of default, or within a period of time reasonably necessary for such cure, including a shorter period of time if applicable.
(C) Termination. If Contractor fails to cure the default or fails to expediently take steps reasonably calculated to cure the default within the time period specified in the notice of default, City may issue written notice to Contractor and its performance bond surety of City’s termination of the Contract for default.
(D) Waiver. Time being of the essence in the performance of the Work, if Contractor’s surety fails to arrange for completion of the Work in accordance with the Performance Bond within seven calendar days from the date of the notice of termination pursuant to paragraph (C), City may immediately make arrangements for the completion of the Work through use of its own forces, by hiring a replacement contractor, or by any other means that City determines advisable under the circumstances. Contractor and its surety will be jointly and severally liable for any additional cost incurred by City to 221
CC 03-18-2025
221 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 85
complete the Work following termination, where “additional cost” means all cost in excess of the cost City would have incurred if Contractor had timely completed Work without the default and termination. In addition, City will have the right to immediate possession and use of any materials, supplies, and equipment procured for the Project and located at the Project site or any Worksite on City property for the purposes of completing the remaining Work.
(E) Compensation. Within 30 days of receipt of updated as-builts, all warranties, manuals, instructions, or other required documents for Work installed to date, and delivery to City of all equipment and materials for the Project for which Contractor has already been compensated, Contractor will be compensated for the Work satisfactorily performed in compliance with the Contract Documents up to the effective date of the termination pursuant to the terms of Article 8, Payment, subject to City’s rights to withhold or deduct sums from payment otherwise due pursuant to Section 8.3, and excluding any costs Contractor incurs as a result of the termination, including any cancellation or restocking charges or fees due to third parties. If Contractor disputes the amount of compensation determined by City, its sole recourse is to comply with the Claim Procedures in Article 12, by submitting a Claim no later than 30 days following notice from City of the total compensation to be paid by City.
(F) Wrongful Termination. If Contractor disputes the termination, its sole recourse is to comply with the Claim procedures in Article 12. If a court of competent jurisdiction or an arbitrator later determines that the termination for default was wrongful, the termination will be deemed to be a termination for convenience, and Contractor’s damages will be strictly limited to the compensation provided for termination for convenience under Section 13.4, below. Contractor waives any claim for any other damages for wrongful termination including special or consequential damages, lost opportunity costs, or lost profits, and any award of damages is subject to Section 12.8, Burden of Proof and Limitations.
13.4 Termination for Convenience. City reserves the right, acting in its sole discretion, to terminate all or part of the Contract for convenience upon written notice to Contractor.
(A) Compensation to Contractor. In the event of City’s termination for convenience, Contractor waives any claim for damages, including for loss of anticipated profits from the Project. The following will constitute full and fair compensation to Contractor, and Contractor will not be entitled to any additional claim or compensation:
(1) Completed Work. The value of its Work satisfactorily performed as of the date notice of termination is received, based on Contractor’s schedule of values and unpaid costs for items delivered to the Project site that were fabricated for incorporation in the Work;
(2) Demobilization. Demobilization costs specified in the schedule of values, or if demobilization costs were not provided in a schedule of values pursuant to Section 8.1, then based on actual, reasonable, and fully documented demobilization costs; and
(3) Termination Markup. Five percent of the total value of the Work performed as of the date of notice of termination, including reasonable, actual, and documented costs to comply with the direction in the notice of termination for convenience, and demobilization costs, which is deemed to cover all overhead and profit to date.
(B) Disputes. If Contractor disputes the amount of compensation determined by City pursuant to paragraph (A), above, its sole recourse is to comply with the Claim 222
CC 03-18-2025
222 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 86
procedures in Article 12, by submitting a Claim no later than 30 days following notice from City of total compensation to be paid by City.
13.5 Actions Upon Termination for Default or Convenience. The following provisions apply to any termination under this Article, whether for default or convenience, and whether in whole or in part.
(A) General. Upon termination, City may immediately enter upon and take possession of the Project and the Work and all tools, equipment, appliances, materials, and supplies procured or fabricated for the Project. Contractor will transfer title to and deliver all completed Work and all Work in progress to City.
(B) Submittals. Unless otherwise specified in the notice of termination, Contractor must immediately submit to City all designs, drawings, as-built drawings, Project records, contracts with vendors and Subcontractors, manufacturer warranties, manuals, and other such submittals or Work-related documents required under the terms of the Contract Documents, including incomplete documents or drafts.
(C) Close Out Requirements. Except as otherwise specified in the notice of termination, Contractor must comply with all of the following:
(1) Immediately stop the Work, except for any Work that must be completed pursuant to the notice of termination and comply with City’s instructions for cessation of labor and securing the Project and any other Worksite(s).
(2) Comply with City’s instructions to protect the completed Work and materials, using best efforts to minimize further costs.
(3) Contractor must not place further orders or enter into new subcontracts for materials, equipment, services or facilities, except as may be necessary to complete any portion of the Work that is not terminated.
(4) As directed in the notice, Contractor must assign to City or cancel existing subcontracts that relate to performance of the terminated Work, subject to any prior rights, if any, of the surety for Contractor’s performance bond, and settle all outstanding liabilities and claims, subject to City’s approval.
(5) As directed in the notice, Contractor must use its best efforts to sell any materials, supplies, or equipment intended solely for the terminated Work in a manner and at market rate prices acceptable to City.
(D) Payment Upon Termination. Upon completion of all termination obligations, as specified herein and in the notice of termination, Contractor will submit its request for Final Payment, including any amounts due following termination pursuant to this Article
13. Payment will be made in accordance with the provisions of Article 8, based on the portion of the Work satisfactorily completed, including the close out requirements, and consistent with the previously submitted schedule of values and unit pricing, including demobilization costs. Adjustments to Final Payment may include deductions for the cost of materials, supplies, or equipment retained by Contractor; payments received for sale of any such materials, supplies, or equipment, less re-stocking fees charged; and as otherwise specified in Section 8.3, Adjustment of Payment Application.
(E) Continuing Obligations. Regardless of any Contract termination, Contractor’s obligations for portions of the Work already performed will continue and the provisions of the Contract Documents will remain in effect as to any claim, indemnity obligation, 223
CC 03-18-2025
223 of 541
2025 Slurry Seal / Fog Seal Project GENERAL CONDITIONS Project # 2025-102 Page 87
warranties, guarantees, submittals of as-built drawings, instructions, or manuals, record maintenance, or other such rights and obligations arising prior to the termination date.
Article 14 - Miscellaneous Provisions
14.1 Assignment of Unfair Business Practice Claims. Under Public Contract Code § 7103.5, Contractor and its Subcontractors agree to assign to City all rights, title, and interest in and to all causes of action it may have under section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2 (commencing with § 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the Contract or any subcontract. This assignment will be effective at the time City tenders Final Payment to Contractor, without further acknowledgement by the parties.
14.2 Provisions Deemed Inserted. Every provision of law required to be inserted in the Contract Documents is deemed to be inserted, and the Contract Documents will be construed and enforced as though such provision has been included. If it is discovered that through mistake or otherwise that any required provision was not inserted, or not correctly inserted, the Contract Documents will be deemed amended accordingly.
14.3 Waiver. City’s waiver of a breach, failure of any condition, or any right or remedy contained in or granted by the provisions of the Contract Documents will not be effective unless it is in writing and signed by City. City’s waiver of any breach, failure, right, or remedy will not be deemed a waiver of any other breach, failure, right, or remedy, whether or not similar, nor will any waiver constitute a continuing waiver unless specified in writing by City.
14.4 Titles, Headings, and Groupings. The titles and headings used and the groupings of provisions in the Contract Documents are for convenience only and may not be used in the construction or interpretation of the Contract Documents or relied upon for any other purpose.
14.5 Statutory and Regulatory References. With respect to any amendments to any statutes or regulations referenced in these Contract Documents, the reference is deemed to be the version in effect on the date that bids were due.
14.6 Survival. The provisions that survive termination or expiration of this Contract include Contract Section 11, Notice, and subsections 12.1, 12.2, 12.3, 12.4, 12.5, and 12.6 of Section 12, General Provisions; and the following provisions in these General Conditions:
Section 2.2(J), Contractor’s Records, Section 2.3(C), Termination, Section 3.7, Ownership, Section 4.2, Indemnity, Article 12, Dispute Resolution, and Section 11.2, Warranty.
END OF GENERAL CONDITIONS
224
CC 03-18-2025
224 of 541
2025 Slurry Seal / Fog Seal Project SPECIAL CONDITIONS Project # 2025-102 Page 88
Special Conditions
1. Construction and Demolition Debris Management Plan
A completed construction and demolition (C&D) Debris Management Plan must be submitted using the City’s Green Halo on-line application. All debris disposal and recycling from the construction project must be tracked throughout the duration of the project. The contractor must use Green Halo cupertino.wastetracking.com to create their Plan and to submit all construction waste generation tonnage information. No additional compensation will be paid for implementation of the Debris Management Plan and failure to meet all plan requirements may result in work stoppage, fines, and/or backcharges. For additional information, visit www.cupertino.gov/greendev
2. Authorized Work Days and Hours.
2.1 Authorized Work Days. Except as expressly authorized in writing by City, Contractor is limited to performing Work on the Project on the following days of the week, excluding holidays observed by City: Monday to Friday.
2.2 Authorized Work Hours. Except as expressly authorized in writing by City, Contractor is limited to performing Work on the Project between 7:00 a.m. to 5:00 p.m., Monday through Friday (excluding City observed holidays). Work hours within the travel shall be determined by street type and proximity to schools. See Technical provisions. Vehicle travel may be further limited by Cupertino Municipal code. See Truck Traffic Restrictions map included with these specifications. Any request for work outside of these hours must be submitted in writing and approved in advance by the City’s Team two working days in advance.
Equipment and material may arrive no earlier than 7:00 a.m. to the site.
3. Pre-Construction Conference. City will designate a date and time for a pre-construction conference with Contractor following Contract execution. Project administration procedures and coordination between City and Contractor will be discussed, and Contractor must present City with the following information or documents at the meeting for City’s review and acceptance before the Work commences:
3.1 Name, 24-hour contact information, and qualifications of the proposed on-site superintendent;
3.2 List of all key Project personnel and their complete contact information, including email addresses and telephone numbers during regular hours and after hours;
3.3 Staging plans that identify the sequence of the Work, including any phases and alternative sequences or phases, with the goal of minimizing the impacts on residents, businesses and other operations in the Project vicinity;
5.4 If required, traffic control plans associated with the staging plans that are signed and stamped by a licensed traffic engineer;
3.5 Draft baseline schedule for the Work as required under Section 5.2 of the General Conditions, to be finalized within ten days after City issues the Notice to Proceed;
3.6 Breakdown of lump sum bid items, to be used for determining the value of Work completed for future progress payments to Contractor;
225
CC 03-18-2025
225 of 541
2025 Slurry Seal / Fog Seal Project SPECIAL CONDITIONS Project # 2025-102 Page 89
3.7 Schedule with list of Project submittals that require City review, and list of the proposed material suppliers;
3.8 Videotape and photographs recording the conditions throughout the pre- construction Project site, showing the existing improvements and current condition of the curbs, gutters, sidewalks, signs, landscaping, streetlights, structures near the Project such as building faces, canopies, shades and fences, and any other features within the Project area limits;
3.9 If requested by City, Contractor’s cash flow projections; and
3.10 Any other documents specified in the Special Conditions or Notice of Potential Award.
4. Insurance Requirements. The insurance requirements under Section 4.3 of the General Conditions are modified for this Contract, as set forth below. Except as expressly stated below, all other provisions in Section 4.3 are unchanged and remain in full force and effect.
4.1 Builders Risk Insurance Waived. The builder’s risk insurance policy requirement set forth in subsection 4.3(A)(5) of the General Conditions is hereby waived and does not apply to this Contract.
5. Traffic Control Requirements
The Contractor shall submit traffic control plans to the Engineer for approval five (5) working days prior to the pre -construction meeting. Traffic control plans shall conform to the requirements in item number 5.22 below. All cost and expense for traffic control shall be included in the bid prices for various bid items and no special compensation shall be allowed.
5.1 The Contractor shall conduct operations and schedule cleanup so as to cause the least possible obstruction and inconvenience to traffic, pedestrians, cyclists and adjacent property owners. All work areas shall be swept clean at the end of each day’s work and at other times when directed by the Engineer. A mobile street sweeper shall be used wherever practical and dust shall be suppressed to the satisfaction of the Engineer.
5.2 The Contractor shall protect open excavations, trenches, and such during construction with fences, covers, and railings as required, together with signs, lights, and other warning devices sufficient to maintain safe pedestrian, bicycle and vehicular traffic to the satisfaction of the Engineer.
5.3 Damage done by the Contractor during the course of the work to adjacent City, public or private property shall be repaired in kind, or as directed by the Engineer, at the Contractor’s expense. This includes the repair of traffic loop detectors, striping, signing, curb markings, etc. Loop detectors must be repaired within one week of the damage.
5.4 The Contractor shall remove all forms, debris, and undesirable material from the job site at the end of each work day. After each site has been completed, the Contractor shall restore planting areas and other areas abutting the work to the condition existing at the start of work.
5.5 No stockpiling of materials or parking of equipment during non -working hours will be allowed on City property, i.e., streets, alleys, parking lots, sidewalks, etc.
226
CC 03-18-2025
226 of 541
2025 Slurry Seal / Fog Seal Project SPECIAL CONDITIONS Project # 2025-102 Page 90
5.6 The Contractor's employees are subject to all parking regulations in effect in the City of Cupertino.
5.7 The Engineer shall have the right to limit the amount of asphalt digouts which may be opened or partly opened at any time. No more than 300 feet of asphalt digouts shall be left open at any one time.
5.8 All open trench and excavations must be backfilled and paved with temporary asphalt concrete or non -skid steel plated at the end of each work day. The Contractor shall place 18 inches cold cutback around the edges of steel plates to eliminate the vertical edges.
5.9 Spillage resulting from hauling operations along or across any public traveled way shall be removed immediately by the Contractor at his expense.
5.10 The Contractor shall place barricades 50 feet on center at the gutter joints and provide one working flasher for each barricade and shall insure that each flasher is maintained in working condition while in use. The Contractor shall not remove the barricades in the street at any given location until the asphalt concrete patching adjacent to the gutter and/or gutter overlay has been done and the hazard to bicyclists and motorists no longer exist.
5.11 Contractor shall maintain access to all driveways except when actually doing construction within the driveway boundaries, at which time partial access will be maintained unless alternate arrangements can be made with the property owners or tenants in advance. If the driveway to any garage or parking area is to be closed for construction work, prior written approval must be obtained from the property owners and the Engineer. Notice shall be posted by the Contractor 72 hours in advance stating the approximate time the driveway will be closed and reopened.
5.12 City of Cupertino Truck Routes for all hauling shall be used, as described in Section 10 of the Special Provisions.
5.13 Contractor shall obtain a Transportation permit from the Public Works Department for any vehicle which exceeds weight or dimensions prescribed in the California Vehicle Code.
5.14 The Contractor shall provide a certified professional traffic control crew that is independent from the construction activity. This traffic control crew shall be responsible to the Contractor for implementing the traffic control measures detailed in this Contract.
The crew is subject to the approval of the Engineer.
5.15 The Contractor shall supply, place, and maintain all necessary traffic control devices during construction in accordance with the applicable requirements of the City of Cupertino, the California Manual of Uniform Traffic Control Devices, and the traffic control plans approved by the City.
5.16 All traffic control devices shall conform to Section 12 of the Caltrans Standard Specifications. They are to be in good condition and sufficiently clean so as to be easily visible to traffic. All signs shall be placed in positions where they convey their message most effectively or as shown on the approved traffic control plan.
5.17 Type II and III barricades with working flashers shall be used. At least one working flashing light must be installed on each barricade for night work. Flashing lights must be maintained in good working order throughout the duration of the work.
Crosswalk closing barricades shall be Type II with a 6" orange border at the base. 227
CC 03-18-2025
227 of 541
2025 Slurry Seal / Fog Seal Project SPECIAL CONDITIONS Project # 2025-102 Page 91
5.18 Signs to be used for traffic control shall conform to the requirements of the California Manual of Uniform Traffic Control Devices. Signs that are attached to existing poles shall not cause any damage to the poles when they are attached or removed. All of the hardware that is used when attaching signs to existing poles shall be completely removed from the poles when the signs are removed. If a construction sign is required in an area where it cannot be attached to an existing pole, it shall be attached to a 4” x 4” wooden pole. The distance from the ground surface to the bottom of the sign shall be seven (7) feet.
5.19 A flag-type high level warning device with three or more flags shall be used for each direction of traffic affected, generally placed within the taper area.
5.20 Flashing arrow boards shall be Type A or Type II as described in Section 6F.56 of the California Manual of Uniform Traffic Control Devices. Flashing arrow boards are required for lane shifts and reductions and may be required for nighttime work.
5.21 Dated “No Parking Tow Away” signs shall be posted a minimum of 72 hours in advance of all work requiring that cars not be parked on the street. Date and time of work shall be written on signs in two -inch-high letters with a ¼ -inch felt black marker.
Signs shall be posted 50 feet on center and removed immediately after the work is completed. The Contractor must notify the Project Inspector with locations of posting to verify sevent-two (72) hour notice.
5.22 Traffic Control Plans. A traffic control plan consistent with the following generally applicable conditions must be approved by the Public Works Department 30 days prior work. The Contractor shall supply, place, and maintain all necessary traffic control devices in accordance with the California Manual of Uniform Traffic Control Devices and the following conditions:
• Traffic control plans will include a schedule of construction showing each phase of work and the anticipated method of handling traffic for each phase. Traffic control plans will include a scaled drawing of the street, lane configuration, parking, sidewalk, work area, and the location of signs and cones, etc., to warn, direct, and guide the traffic. The traffic control plan shall reflect actual (not typical) intersection layout and indicate islands, medians, lane lines, bike lanes, nearby driveways, and note all pavement and lane widths. All traffic control plans shall be professionally prepared.
• In general, Contractor shall maintain all vehicular, pedestrian, and bike movements. No total closure of any arterial or collector street will be permitted.
City may allow closure of local residential streets but Contractor shall always maintain local and emergency access.
• The Contractor shall maintain one lane of traffic in each direction at all times on all streets. The clear width of the lane shall be a minimum of 10 feet.
• A minimum four feet clear sidewalk shall be maintained unless the work makes closure unavoidable, in which case the sidewalk may be closed while working, subject to the approval of the Engineer. However, an alternate pedestrian facility must be provided for the duration of the closure. At intersections, work will be permitted at one corner at a time so pedestrian movements can be maintained through the intersection.
5.23 Work shall not restrict visibility of any traffic control device. 228
CC 03-18-2025
228 of 541
2025 Slurry Seal / Fog Seal Project SPECIAL CONDITIONS Project # 2025-102 Page 92
5.24 No work will be permitted within 1500 feet of school grounds until after 9:30 a.m. on school days. Other special restrictions may be required at heavily used school crossings or school commute routes beyond 1500 feet from the school grounds as deemed necessary for student safety by the Engineer.
5.25 No closure of lanes on arterial and collector streets will be permitted between the hours of 7 and 9 a.m. and 3:30 and 7 p. m.
5.26 If work will impact transit stops or transit routes, Contractor shall be required to contact Santa Clara Valley Transportation Authority or other affected transit companies to address relocation of facilities or rerouting of buses prior to submitting traffic control plan.
Traffic control plan should indicate what actions are being taken with regard to transit services.
5.27 Any work within 150 feet of any signalized intersection should be coordinated with the Traffic Signal Technician at (408) 777-1366.
5.28 The Contractor shall be required at Contractor’s expense to hire Santa Clara County Sheriff’s officers to direct traffic when working at signalized intersections, especially when (1) equipment is intermittently blocking or crossing a traffic lane; (2) only one lane of traffic is available for two directions of traffic; (3) one lane of traffic is available in each direction, but the left turning traffic is also using the through lane; and (4) at multiple lane signalized intersections. A minimum of two officers per intersection shall be required. Additional officers may be required by the engineer.
5.29 All signs and other warning devices shall be provided by the Contractor and shall become his property after completion of the Contract. The cost of providing, installing and maintaining signs, lights, caution tape, delineators, flares, barricades and other facilities as directed by the Engineer for the convenience and direction of public traffic shall be included in the prices paid for the various items of work involved in the project.
5.30 The above requirements are a minimum and do not limit the Contractor’s responsibility of doing all that is practical and necessary to ensure the safety of workers, pedestrians, bicyclists, and motorists. The Contractor shall conform to the above traffic control requirements which are generally applicable to most common situations. Based on the nature of a job, additional conditions or exceptions to the above conditions may be necessary.
6. SUBMITTALS FOR QUALITY ASSURANCE. In the Technical Specifications, the City may specify quality assurance requirements, including qualifications for special skills and experience required of the Contractor. For any specified skill, the Contractor may use a subcontractor that specializes in the work and meets the performance requirements or the Contractor may self-perform the work, subject to demonstrating the necessary skill, experience, and/or certifications to perform the work.
The Contractor will submit verification that the materials and labor skills meet the specified requirements prior to implementing the specific work though the submittal process.
7. NOTIFICATION TO ABUTTING PROPERTIES The contractor shall provide advanced notification to residents , businesses and schools a minimum of two times prior to construction as follows.
10.1 Advanced Notification Doorhangers
229
CC 03-18-2025
229 of 541
2025 Slurry Seal / Fog Seal Project SPECIAL CONDITIONS Project # 2025-102 Page 93
The contractor shall submit a sample door hanger to the City of Cupertino for review and approval. At a minimum, the doorhanger shall include the type of work to be completed, limits of work, hours of work, parking and access restrictions during construction and contractor contact information. The first door hanger shall be distributed to residents , businesses and schools along effected streets 5 working days prior to construction. The second shall be distributed 48 hours prior to commencement of work. Notification will be necessary prior to each phase of work including crack seal, slurry seal and fog seal . Contractor must also notify schools when work occurs on a route to school or within 500 ft radius of school. If construction operations are delayed for any reason beyond the duration stipulated in the notices, the Contractor shall re - issue written notices that explain the delay and provide a revised schedule. Payment for compliance with this section shall be deemed included in the various other items of work, and no additional compensation will be allowed therefore.
SAMPLE NOTICE:
NOTICE TO RESIDENTS / BUSINESS OWNERS
Date: [MONTH] [DAY], [YEAR]
Subject: [NAME OF PROJECT] – [Seven Day OR Two Day] Notice
This notice is to inform you that the City of Cupertino, Department of Public Works, has contracted with [CONTRACTOR NAME] to [SCOPE OF WORK] along [STREET NAME] from [ADJACENT CROSS STREET] to [ADJACENT CROSS STREET]. This [SCOPE OF WORK] will mainly occur on [WEEKDAYS, SEE “SCHEDULE OF WORKING
DAYS/HOURS”] from [START TIME] to [END TIME] and is scheduled to start in your area APPROXIMATELY seven days from the date of this notice and will continue from [START DATE] until [END DATE] . Please be aware that there may be construction activities that cause traffic delays. [CONTRACTOR NAME] will make every effort to maintain normal traffic access and minimize disruption in your neighborhood. No Parking / Tow‐Away signs will be posted in affected areas two working days in advance of enforcement. Access to driveways will be maintained at ALL times during the construction. Prior to activities in your i mmediate area, you will be sent a notification TWO WORKING DAYS before work begins. [CONTRACTOR NAME] and the City of Cupertino, Department of Public Works, apologize for any inconvenience due to these activities. If you have any questions or need assistance as these activities progress, please call the number(s) listed below:
[CONTRACTOR NAME]
7.2 Night Work Notification
The Contractor shall distribute advan ced notification of night work to residents and businesses located within 750’ of the limits of night work. The notice shall include dates and times of work to be completed. The Contractor shall submit a draft notification for review and approval prior to distribution. Notices shall be delivered a minimum of one week prior to work.
7.3 Towing Procedure
230
CC 03-18-2025
230 of 541
2025 Slurry Seal / Fog Seal Project SPECIAL CONDITIONS Project # 2025-102 Page 94
Cupertino Municipal Code Section 11.24.200 D authorizes the tow away of vehicle parked on a public street where construction or street repair work is scheduled to occur.
The Contractor performing the scheduled work is responsible for erecting the required signs giving notice that such vehicles may be towed away if left on the street during the time that the work is scheduled to be performed. The signs shall be erected at least 72 hrs. prior to the scheduled start of work. The specific dates and times of work shall be written in two-inch-high letters with a ¼-inch felt black marker. Signs shall be posted on Type II barricades, 50 feet on center and removed immediately after the work is complete. The Contractor shall update signs as necessary. The Contractor must notify the Project Inspector with locations of posting, to verify forty-eight (48) hour notice. All costs for notification and posting of signs shall be included in the various items of work and no special compensation will be allowed.
END OF SPECIAL CONDITIONS
231
CC 03-18-2025
231 of 541
2025 Slurry Seal / Fog Seal Project Technical Specifications Project # 2025-102 Page 95
TECHNICAL SPECIFICATIONS
1. TRAFFIC CONTROL (Bid Item Number 1)
a. Item Requirement
Contractor shall furnish all necessary supervision, labor, materials, construction tools and equipment, supplies to complete traffic control at each location during the times immediately prior, during and after work.
b. Scope
Construction area signs shall be furnished, installed, and removed when no longer required. The Contractor’s attention is directed to Section 7-
1.08, "Public Convenience", Section 7-1.09, "Public Safety", and Section 12, "Construction Area Traffic Control Devices", of the Caltrans Standard Specifications and Section 00820 Traffic Control Requirements of these specifications.
All traffic control devices shall conform to the latest "Manual of Traffic Control for Construction and Maintenance Work Zones" issued by Caltrans.
(a) Advance construction warning signs shall be placed on all streets leading into the construction area before any construction is started. (b) Speed limit advisories may be placed along the main traffic lanes. (c) When detours or changes in traffic lanes are required, directional signs shall be placed at each end and along the roads.
(d) Warning signs, caution signs, and end construction signs, shall be placed at each end of the work and along the route when conditions warrant their use.
The Contractor shall submit a detailed traffic control plan for all work that requires lane closures at least 5 days prior to the lane closure. No lane closure will be allowed without prior approved traffic control plan specific to that location. Traffic control shall be planned for each individual lane closure with detail layouts of all signage locations.
The Contractor is responsible for proper placement and maintenance of all signs and barricades. Any additional signs, barricades, lights, etc., that may be required by the Engineer to ensure public safety shall be installed and maintained by the Contractor.
Note: Traffic Controls – Qualified Individual: Traffic controls through the construction zone shall be designed and maintained by a designated individual qualified in this responsibility. The qualified traffic control individual shall have no other responsibilities other than traffic control. 232
CC 03-18-2025
232 of 541
2025 Slurry Seal / Fog Seal Project Technical Specifications Project # 2025-102 Page 96
The name(s) of the qualified traffic control individual shall be submitted and approved prior to beginning work.
If required in the traffic control plan, and always during one way traffic control, flagmen will be required to direct traffic during construction. The number and location of flagmen shall be sufficient to allow safe control and passage of traffic through the work zone. During the paving of intersections, two flagmen shall be posted at each intersection for the entire duration of work and until the intersection is open to normal traffic operations.
If a cross street needs to be temporarily closed when work is in progress through the intersection and the anticipated delay is more than five minutes, a detour sign shall be installed on the cross street and shall include the installation of advance signing displaying the anticipated delay time. The signing shall be reviewed by the Traffic Engineer.
When required by the Engineer, the Contractor shall supply two (2) message boards per arterial / collector street, to be placed at designated locations for advanced warning of construction dates and times. The message shall be preapproved by the engineer prior to programming.
Message boards shall be set up at least two weeks prior to work.
The term “Construction Area Signs” shall include all temporary signs required for the direction of public traffic through or around the work during construction. Such signs are shown in or referred to in the current MANUAL OF TRAFFIC CONTROLS – Warning signs, Lights and Devices for Use in Performance of Work Upon Highways, published by the State of California, Department of Transportation, hereinafter referred to as MANUAL OF TRAFFIC CONTROLS.
Restrictions on Closure of Traffic Lanes
The streets shall be open for use by public traffic on Saturday, Sunday, and any day designated by the City as a legal holiday or any day preceding a designated legal holiday; before 8 a.m. and after 5 p.m., Monday thru Friday or as further restricted by Attachment A, and when construction operations are not actively in progress on working days.
During daily construction operations, there may be certain peak traffic hours that would require the Contractor to alter the construction schedule in order to minimize the impact of the work on the public’s convenience.
The following provisions shall apply on the listed street segments:
Street
Special Traffic Control Provision
Arterials:
One lane in each direction of traffic shall be maintained at all times. The roadway shall be open for two -way traffic at all 233
CC 03-18-2025
233 of 541
2025 Slurry Seal / Fog Seal Project Technical Specifications Project # 2025-102 Page 97
times.
Collectors:
N. Portal Ave,
Lazaneo Dr, Mann Dr,
Vista Dr
Streets Near Schools
Lazaneo Dr, Vista Dr,
Pacifica Dr, Farallone
Dr, La Roda Dr, Hyde
Ave, Willowgrove, Ln,
Brookgrove Ln,
Ferngrove Ln, N Portal
Ave, Auburn Dr,
Auburn Ct
On four lane streets, one lane in each direction
shall be maintained at all times. On two lane
streets, flagmen shall be used to maintain traffic
flow and lane closure hours shall be limited to
9:30 AM to 2:00 PM . Contractor shall coordinate
with SCC Fire prior to work on Vista Dr.
Traffic may be limited to only local traffic during
the period between 9:30 a.m. and 2: 00 p.m.
Work may be required on weekends to minimize
traffic impacts. Flagman shall be used to control
traffic. Streets immediately adjacent to
schools shall be sealed when school is out
of session.
Residential:
Traffic may be limited to only local traffic during
the period between 8 a.m. and 4:30 p.m.
Construction vehicle access may be further
limited (see truck traffic restrictions map)
Refer to “Attachment A” – Work Hour Restrictions for authorized lane closure hours on a street by street basis.
Attention is directed to Sections 7-1.08, “Public Convenience,” 7-1.09, Public Safety,” and 12, “Construction Area Traffic Control Devices,” of the State Standards and to the Section entitled “Public Safety” and flagging for traffic control systems elsewhere in these technical specifications.
Nothing in these technical specifications shall be construed as relieving the Contractor from his responsibility as provided in said Section 7-1.09.
Lane closures shall conform to the provisions in the section of these special provisions entitled “Traffic Control for Lane Closure.” Personal vehicles of the Contractor’s employees shall not be parked on the traveled way or shoulders, including any section closed to public traffic.
The Contractor shall notify local authorities of his intent to begin work at least 7 calendar days before work is begun. The Contractor shall cooperate with local authorities relative to handling traffic through the area and shall make his own arrangements relative to keeping the working area clear of parked vehicles.
Whenever vehicles or equipment are parked on the shoulder within 6 feet of a traffic lane, the shoulder area shall be closed with fluorescent traffic cones or portable delineators placed on a taper in advance of the parked 234
CC 03-18-2025
234 of 541
2025 Slurry Seal / Fog Seal Project Technical Specifications Project # 2025-102 Page 98
vehicles or equipment and along the edge of the pavement at 25-foot intervals to a point not less than 25 feet past the last vehicle or piece of equipment. A minimum of 9 cones or portable delineators shall be used for the taper. A C23 (Road Work Ahead) or C24 (Shoulder Work Ahead) sign shall be mounted on a telescoping flag tree with flags. The flag tree shall be placed where directed by Engineer. Bike Lane Closed Ahead and Share the Road signs shall be placed where applicable.
In order to minimize the impact on local merchants, and residents, driveways shall not be blocked for any long periods of time. The Contractor shall maintain access to all driveways before and after road material is placed. The Contractor shall limit the time between the prep time placing and curing time of the asphalt material and cleanup so that vehicles may return the roadway to use.
The full width of the traveled way shall be open for use by public traffic on weekends designated legal holidays, and when construction operations are not actively in progress unless approved otherwise.
Minor deviations from the requirements of this section concerning hours of work which do not significantly change the cost of the work may be permitted upon the written request of the Contractor if in the opinions of the Engineer public traffic will be better served and the work expedited.
Such deviations shall not be adopted until the Engineer has indicated his written approval. All other modifications will be made by contract change orders.
A traffic control system shall consist of closing traffic lanes in accordance with the provisions of Section 12, “Construction Area Traffic Control Devices,” of the State Standards, the provisions under “Maintaining Traffic” elsewhere in these technical specifications.
The provisions in this section will not relieve the Contractor from his responsibility to provide such additional devices or take such measures as may be necessary to comply with the provisions in Section 7-1.09, “Public Safety,” of the State Standards.
If any component in the traffic control system is damaged, displaced, or ceases to operate or function as specified, from any cause, during the progress of work, the Contractor shall immediately repair said component to its original condition or replace said component and shall restore the component to its original location.
Lane closures are made for work periods only, at the end of each work period, all components of the traffic control system, except portable delineators placed along the traveled way, shall be removed from the traveled way, shoulder and auxiliary lanes.
c. Measurement & Payment
235
CC 03-18-2025
235 of 541
2025 Slurry Seal / Fog Seal Project Technical Specifications Project # 2025-102 Page 99
The contract lump sum price paid for Traffic Control shall include full compensation for furnishing all labor including flagging costs, materials (including signs), tools, equipment and incidentals, and for doing all the work involved in placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control system and preparing required traffic control plans, as specified in the State Standards and these technical specifications, and as directed by the Engineer.
2. CRACK SEALING (Bid Item Number 2)
a. Item Requirement
This work shall consist of removing vegetation, embedded sand and dirt and all other debris and incompressible materials, evaporating moisture from cracks and joints in the asphalt concrete pavement, and cleaning and filling the cracks with rubber asphalt joint seal as specified in these special provisions, and as directed by the Engineer.
b. Scope
MATERIALS
The crack sealant shall be a mixture of paving asphalt and ground rubber and shall conform to ASTM D6690, Type II.
CONSTRUCTION
All cracks 3/32 of an inch wide or wider shall be sealed. Immediately prior to applying the sealant, the cracks shall be cleaned. Removal of vegetation and all incompressible materials from cracks and joints shall be by means of hot compressed air lance. (Other methods such as routing with compressed air cleaning may be substituted at engineer’s specification. Under ANY circumstances compressed air used for cleaning MUST be oil free.) Before sealing, the crack surfaces must be made clean, dust free, and dry. The preferred way to remove the moisture is with the use of the hot compressed air lance. The temperature will be at least 2000 degrees F. The lance shall be not more than 50 feet ahead of the sealing unit, as they progress down the pavement, so that the crack area does not have time to cool or take up new moisture from below.
Crack seal materials shall be placed in conformance with the manufacturer's recommendations. Crack seal materials shall not be placed when the surface temperature is below 50 degrees Fahrenheit.
The finished crack seal shall be bonded to the crack such that there is no separation or opening between the sealant and the crack edge and there shall be no cracks, separation or other opening in the sealant.
236
CC 03-18-2025
236 of 541
2025 Slurry Seal / Fog Seal Project Technical Specifications Project # 2025-102 Page 100
The Contractor shall remove crack seal material that is not placed within the conformance of these provisions, clean cracks as specified herein and then reseal the cracks at his expense.
c. Measurement & Payment
The Contract Price shall be paid by the lineal foot for rubberized asphalt crack seal and shall include full compensation for furnishing all labor, materials, tools, equipment, traffic control and incidentals, and for doing all the work involved in constructing rubberized asphalt sealed cracks, complete in place.
3. FOG SEAL (Bid Item Number 3)
a. Item Requirement
The Work under this Section includes providing all labor, material, tools and equipment necessary to apply a polymer modified asphaltic emulsion rejuvenating seal to streets listed in exhibit A.
b. Scope
NOTIFICATION
Contractor shall distribute advanced warning door hangers to all residents and businesses along effected streets and least 48 hours but no more than 96 hours prior to work. At minimum, the door hangers shall include the type of work to be completed, location of work. Scheduled dates of work, access restrictions during construction and contractor contact information.
MATERIALS
The emulsion used shall be polymer modified and shall comply with Section 94 of Caltrans Standard Specifications.
CONSTRUCTION
The Contractor shall be responsible for preparation of the pavement to receive fog seal coat as required under Section 37 of the Standard Specifications.
Immediately prior to the application of fog seal coat, the streets shall be cleaned by sweeping with self -propelled vacuum or regenerative air sweepers with water spray bars to reduce dust. Sidewinder sweepers or brooms that wind row material and do not remove it shall not be used. Prior to fog seal application, pavement surfaces shall be cleaned of all oil, debris, grease spots and weeds. Before applying fog seal coat, contractor shall cover manholes, valve boxes, monument boxes, other exposed facilities and all existing pavement markers, markings, legends and speed bumps within the area of application with plastic or oil resistant construction paper secured in place. All traces of plastic or oil resistant construction paper shall be removed as quickly as possible following application of fog seal. Contrator shall replace or clean 237
CC 03-18-2025
237 of 541
2025 Slurry Seal / Fog Seal Project Technical Specifications Project # 2025-102 Page 101
at his or her own expense any damaged or oil stained items within project limits.
The emulsion shall be applied with a distributor truck to the pavement surface at a rate of .07 gal / S.Y - .10 gal/ S.Y. The final rate of application will be jointly determined by the engineer, contractor and the vendor.
The asphalt distributor for application of the emulsion shall have a full circulation spray bar that is adjustable to at least sixteen (16) feet wide and capable of heating and circulating the emulsion simultaneously. It must have computerized rate control for adjusting and controlling the application from the cab by .01 gallons per square yard increments. The distributor shall also be equipped with a volume measuring devise and a thermometer for measuring the emulsion temperature in the tank.
The fog seal shall not be placed if either the pavement temperature or the air temperature is below 50 degrees F and falling, but may be applied when both the air and pavement temperature is 50 degrees F or above and rising. The fog seal coat shall not be placed if rain has occurred within the past 24 hours.
The weather forecasts should be for highs near sixty degrees Fahrenheit and no rain forecast for the next twenty -four hours after the fog seal has been applied. The fog seal should not be placed if the high temperatures for the day exceed 95 degrees unless approved by the Engineer.
The distributer driver must be experienced at applying rejuvenation seals.
Precautions must be taken to prevent any material from entering the storm drain system. See Section 7.20 of the General Conditions for Storm Water Pollution Prevention requirements.
c. Measurement and Payment
The contract square yard price paid shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, notifying residents and business, and for doing all the work necessary to prepare the surface, mix and apply fog seal and protecting the seal in place until it has set.
No additional compensation will be made therefor. traffic control for fog seal shall be paid under the Traffic Control bid item.
3. SLURRY SEAL (Bid Item Number 4)
a. Item Requirement
The work shall consist of furnishing all necessary labor, materials and equipment for the transporting, mixing of asphaltic emulsion, aggregate and water and spreading the mixture of pavement areas to conform to the Provisions of Section 37 -3, “Slurry Seal and Micro -surfacing,” of the Caltrans 2018 Standard Specifications, Revised Standard Specifications, and these Special Provisions.
Asphalt Emulsion
238
CC 03-18-2025
238 of 541
2025 Slurry Seal / Fog Seal Project Technical Specifications Project # 2025-102 Page 102
Asphaltic Emulsion used for slurry seal shall be designated as grade PMCQS- 1h or equal. Solid polymers shall be adequately blended into the asphalt prior to emulsification. If a liquid latex such as neoprene or similar is used, the latex shall be “co-milled” into the emulsion through the water phase during manufacturing.
Each load of polymer modified asphaltic emulsion shall have a certificate from the asphalt emulsion manufacturer guaranteeing that either asphalt blending or “co-milling” processes were used. The certificate shall also state the percentage of the solid rubber polymer added by weight of the asphalt as well as the composition of the polymer. The addition of latex to the emulsion after emulsion manufacturing is prohibited.
The polymer modified asphalt emulsion shall conform to the following specifications:
A certificate of Compliance shall be furnished to the Engineer in accordance with Section 6-3.05E, “Certificates of Compliance,” of the Standard Specifications and these Special Provisions. The Certificate of Compliance shall include all information stipulated in Section 94, “Asphaltic Emulsions,” of the Standard Specifications. Additional information relevant to the specifications shall be furnished if requested by the Engineer. Samples will be obtained in accordance with ASTM Method D140 or such other methods as are approved by the Engineer.
239
CC 03-18-2025
239 of 541
2025 Slurry Seal / Fog Seal Project Technical Specifications Project # 2025-102 Page 103
Aggregate
Aggregate for the slurry seal shall comply in all respects to requirements in Section 37-3, “Slurry Seal and Micro-surfacing,” of the Standard Specifications for a Type II slurry seal except for the following:
Aggregate shall consist of sound, durable, crushed stone or crushed gravel. If approved by the Engineer, mineral filler will be allowed. Aggregates shall be 100% crushed with no rounded particles, volcanic in origin, and black in color. The use of gray or light-colored aggregate will not be allowed. The percentage composition by weight of the aggregate shall conform to the following grading:
The aggregate shall also conform to the following quality requirements:
When the results of both the aggregate grading and the Sand Equivalent test do not conform to the requirement specified, both payments to the Town shall apply. The Town may deduct these amounts from any monies due, or that may become due the Contractor under the contract. No single aggregate grading or Sand Equivalent test shall represent more than 300 tons or one- day’s production whichever is smaller.
The Contractor, in accordance with Section 6-3.05E, “Certificates of Compliance,” of the Standard Specifications, will furnish a Certificate of Compliance for aggregates used in the slurry seal. The Certificate of Compliance shall include results of laboratory tests indicating the average gradation, minimum sand equivalent and maximum film stripping and durability index, all in accordance with Section 37-2.02, “Materials,” of the Standard Specifications.