PARK AMENITIES PROJECT - INSTALLATION STRATEGY
Park
Memorial
Stevens Creek Corridor
Creekside
Hoover
Jollyman
Linda Vista
MVRC
Portal
Varian
Wilson
Canyon Oak
Franco
Little Rancho
Somerset
Sterling Barnhardt
Three Oaks
Civic Center
Library Field
NO. OF UNITS

UNIT COST

SUBTOTAL BY

AMENITY/NO CIP

CIP SUBTOTAL
*Garbage Cans/ Recycling Bins (Trios): counted as units, whether planned as a trio, duo, or single.

Each count as one unit.

CIP-1: Include in Memorial Park redesign
CIP-2: USB charging tables
CIP-3: add water play feature
Outdoor Table Tennis
INSTALLED: Outdoor
T
able Tennis
Exercise Equipment
INSTALLED: Exercise
E
quipment
Cornhole
INSTALLED: Cornhole
Mile Markers
INSTALLED: Mile
M
arkers
Inclusive Swings
INSTALLED: Inclusive
S
wings
Checkers Table
INSTALLED: Checkers
T
able

CIP CIP
1 1
CIP 1
1 1
1 0
3 2 0 0 2 0
$
7,000 $300,000 $50,000
$21,000 $27,012 $0 $0 $0 $50,000 $0
$
600,000 $50,000

Page 2 of 3 ends

377
CC 03-03-2026 Searchable Packet
377 of 495

PARK AMENITIES PROJECT - INSTALLATION STRATEGY
Park
Memorial
Stevens Creek Corridor
Creekside
Hoover
Jollyman
Linda Vista
MVRC
Portal
Varian
Wilson
Canyon Oak
Franco
Little Rancho
Somerset
Sterling Barnhardt
Three Oaks
Civic Center
Library Field
NO. OF UNITS

UNIT COST

SUBTOTAL BY

AMENITY/NO CIP

CIP SUBTOTAL
*Garbage Cans/ Recycling Bins (Trios): counted as units, whether planned as a trio, duo, or single.

Each count as one unit.

CIP-1: Include in Memorial Park redesign
CIP-2: USB charging tables
CIP-3: add water play feature
Tennis Court
INSTALLED: Tennis
C
ourt
Gathering Space
INSTALLED: Gathering
Space
Bike Racks
INSTALLED: Bike
R
acks
Nature Play
INSTALLED: Nature
P
lay
BBQ
INSTALLED: BBQ
Volleyball
INSTALLED: Volleyball
CIP 1
1 1
CIP-3
0 1 1 2 1 0
$300,000 $1,000 $300,000 $3,500
$0 $0 $1,000 $300,000 $3,500 $0
$300,000 $300,000

Page 3 of 3 ends

378
CC 03-03-2026 Searchable Packet
378 of 495
Status
From Parks and Recreation Commission meeting 10/05/2023 *2024 Update: Grounds staff installed two
benches adjacent to the Jollyman DOLA, and
two benches adjacent to the Linda Vista DOLA.
379
CC 03-03-2026 Searchable Packet
379 of 495
• DOLA users have
requested Hedge +
Fence installation.

Estimated Cost: $29,000
• DOLA users have
requested additional
seating
Potential Additions
Linda Vista Park
From Parks and Recreation Commission meeting 10/05/2023 *Completed
*2025 Update: Grounds staff proposes to
install two Group BBQ's with adjustable grill
and two serving tables. This will be reviewed at
the April 2025 Parks and Recreation
Commission meeting.
380
CC 03-03-2026 Searchable Packet
380 of 495

5. From the 2019 Green
Stormwater Infrastructure Plan

5. GSI
FY 2023-24 CIP 5-Year Plan
381
CC 03-03-2026 Searchable Packet
381 of 495

City of Cupertino
Green Stormwater Infrastructure Plan

Approved on: September 3, 2019
Approved by: The City Council of the City of Cupertino

Submitted by:

City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014

In compliance with Provision C.3.j.i.(2) of Order R2-2015-0049 382
CC 03-03-2026 Searchable Packet
382 of 495
City of Cupertino GSI Plan
35 These potential CIP project locations are shown on the map in Figure 5-3. A GSI concept for the Mary Avenue Greenbelt and Trail Project was completed for the SWRP. The project is currently unfunded, and the concept design is intended to assist with the grant application process should the City decide to pursue funding via Proposition 1 or other State bond-funded grant program. 383
CC 03-03-2026 Searchable Packet
383 of 495
City of Cupertino GSI Plan
36 Figure 5-3. City of Cupertino Public Projects with Potential for GSI (Source: City of Cupertino FY 17-18 Annual Report, and 2018 Santa Clara Basin Stormwater Resource Plan)

384
CC 03-03-2026 Searchable Packet
384 of 495
City of Cupertino GSI Plan
37 Prioritization Output
The map in Figure 5-4 presents a compilation of the factors used to identify and prioritize the City’s opportunities for GSI projects: the City’s list of parcel-based and green street project opportunities, overlaid with the City’s PDA, Special Areas, and CIP projects that may have potential to include GSI. The locations of the City’s completed GSI projects, including the McClellan Ranch West Parking Lot project which is under construction and expected to be completed by September 2019, are also shown. As shown in Figure 5-4, a large number of the green street opportunities identified in the SWRP are located within the City’s PDA and Special Areas. This indicates a strong correlation between the areas identified as having potential for GSI and the City’s construction and redevelopment plans.

The City’s list of parcel-based and green street opportunities is provided in tabular format in Appendix B.

The list includes additional information for each parcel and green street opportunity, including general information such as APN, landowner and land use or street name, the SWRP prioritization score for each project opportunity, and co-location with a City criteria for prioritization (CIP project, PDA or Special Area).

An implementation plan is described in Section 6 to guide the development, design, and construction of GSI projects.

385
CC 03-03-2026 Searchable Packet
385 of 495
City of Cupertino GSI Plan
38 Figure 5-4 City of Cupertino GSI Overview
386
CC 03-03-2026 Searchable Packet
386 of 495

6. From the 2018 Storm Drain
Master Plan

6. STORM DRAINS
FY 2023-24 CIP 5-Year Plan
387
CC 03-03-2026 Searchable Packet
387 of 495

September, 2018 5-1 Schaaf & Wheeler

CONSULTING CIVIL ENGINEERS

Chapter 5. Capital Improvement Plan

5.1. Overview
Chapter 4 discusses Cupertino’s storm drain collection system and recommends prioritized capital improvements to address known and modeled deficiencies. This chapter provides a Capital Improvement Program (CIP) that recognizes these priorities. The CIP provides an overall guideline for the City to use as a tool in preparing annual budgets. Exigent circumstances and future in- field experiences may necessitate deviations from the Storm Drain CIP. A master plan is intended to be a tool for planning. Capital improvement priorities are not intended to be hard and fast.

The CIP does not include the cost of new facilities related to new development (e.g., pipeline extensions to serve areas that are currently undeveloped). These new facilities may be constructed as part of the new developments, and are not included in the CIP.

5.2. Capital Improvements Priorities
The proposed CIP for storm drainage in Cupertino is broken into three priority levels for the purpose of funding and implementation. The total cost summary for CIP projects is shown for each priority level in Table 5-1.

Summary of CIP Costs Based on Priority Level (total project cost) Table 5-1: Summary of CIP Costs Based on Priority Level (total project cost) Priority Level Cost1
High Priority Capital Improvements $12,520,000
Moderate Priority Capital Improvements $25,880,000
Low Priority Capital Improvements $40,880,000
Total Capital Improvement Program $79,280,000

1. Cost rounded to the nearest ten thousand
The above costs do not include design, administration, or construction contingencies. Project subtotals (cost of pipe demolition and replacement), construction totals (including traffic control, mobilization, demobilization, and contingency), and CIP totals (including design and engineering costs) are detailed in Appendix C.

5.3. Open Trench Improvements
Two essential types of projects are traditionally utilized to increase storm drain system capacity:
• Install a new relief storm drain parallel to the system lacking capacity, or • Replace the overloaded pipe with larger diameter pipe in the same alignment.

The two alternatives can be made equivalent to one another using the following formula, assuming that pipe material and length are equal:

388
CC 03-03-2026 Searchable Packet
388 of 495
Cupertino Storm Drain Master Plan
Chapter 5: Cupertino System Evaluation
September, 2018 5-4 Schaaf & Wheeler

CONSULTING CIVIL ENGINEERS

Table 5-3: CIP Projects for the City of Cupertino
Project Priority Project Length Total MH # Total Project Cost1 Pumpkin Fiesta Phase 1 High 587 4 $ 476,000 Pumpkin Fiesta Phase 2 High 1698 9 $ 1,402,000 Bubb Phase 1 High 302 2 $ 182,000
Bubb Phase 2 High 823 10 $ 583,000
Bubb Phase 3 High 3048 17 $ 1,651,000
Foothill South Phase 1 High 1643 11 $ 1,295,000 Foothill South Phase 2 High 2186 9 $ 1,219,000 McClellan Phase 1 High 4270 20 $ 2,558,000 McClellan Phase 2 High 2020 10 $ 1,136,000 Stevens East High 1428 6 $ 816,000
Foothill North Phase 1 High 1164 9 $ 567,000 Foothill North Phase 2 High 1192 7 $ 515,000 Cali High 235 4 $ 115,000
Beardon Moderate 2211 11 $ 1,060,000
Blaney North Moderate 3034 12 $ 1,503,000
Blaney South Moderate 2633 12 $ 1,221,000
Bollinger Moderate 2987 16 $ 1,612,000
Calle de Barcelona Moderate 4144 15 $ 2,019,000 Calvert Moderate 1465 6 $ 690,000
Columbus Moderate 4547 19 $ 2,072,000
Finch Moderate 1000 6 $ 428,000
Fort Baker Moderate 3280 14 $ 1,432,000
John Moderate 982 6 $ 379,000
Kingsbury Moderate 1689 9 $ 676,000
Majestic Oak Moderate 513 4 $ 200,000
Peach Blossom Moderate 3694 13 $ 1,539,000 Poppy Moderate 1331 7 $ 623,000
Rainbow Moderate 1119 4 $ 568,000
Rodrigues Moderate 4811 20 $ 2,259,000
Royal Oak Moderate 746 6 $ 304,000
Scenic Moderate 682 6 $ 308,000
Scotland Moderate 1349 8 $ 550,000
Stafford Moderate 1217 6 $ 496,000
Stelling North Moderate 2689 13 $ 1,541,000 Stelling South Moderate 3232 14 $ 1,374,000 Stern Moderate 1390 6 $ 533,000
Stevens West Moderate 1578 8 $ 621,000 Stokes Moderate 2283 13 $ 1,048,000
Vista Moderate 1571 10 $ 633,000
Weymoth Moderate 518 3 $ 189,000
Adriana Low 140 2 $ 66,000
Ainsworth Low 637 4 $ 348,000
389
CC 03-03-2026 Searchable Packet
389 of 495
Cupertino Storm Drain Master Plan
Chapter 5: Cupertino System Evaluation
September, 2018 5-5 Schaaf & Wheeler

CONSULTING CIVIL ENGINEERS

Project Priority Project Length Total MH # Total Project Cost1 Alcalde Low 847 6 $ 418,000
Alhambra Low 924 6 $ 366,000
Alves Low 2926 19 $ 1,326,000
Bandly Low 219 2 $ 89,000
Baywood Low 828 5 $ 307,000
Bubb North Low 1617 5 $ 697,000
Bubb South Low 1219 7 $ 584,000
Byrne Low 678 6 $ 304,000
Candlewood Low 1348 7 $ 562,000
Castine Phase 1 Low 1587 9 $ 920,000
Castine Phase 2 Low 1069 4 $ 429,000
Clarkston Low 991 6 $ 370,000
Clifford Low 944 4 $ 344,000
Colony Hills Low 605 3 $ 214,000
De Anza Circle Low 298 3 $ 125,000
De Anza North Phase 1 Low 1660 7 $ 859,000 De Anza North Phase 2 Low 1776 15 $ 936,000 De Anza South Low 1014 5 $ 569,000
De Foe Low 466 5 $ 230,000
DeAnza Low 203 2 $ 97,000
Deep Cliffe Low 482 3 $ 172,000
Derbyshire Low 1101 5 $ 389,000
Drake Low 985 5 $ 341,000
Elmsford Low 1182 4 $ 394,000
Estates Low 727 4 $ 292,000
Fairwoods Low 627 4 $ 271,000
Farallone Low 330 3 $ 134,000
Felton Low 330 4 $ 206,000
Gardena Low 166 2 $ 70,000
Gardenside Low 933 5 $ 335,000
Greenwood Low 712 3 $ 245,000
Homestead Low 2873 10 $ 1,325,000
Homestead West Phase 1 Low 7946 38 $ 4,339,000 Homestead West Phase 2 Low 1260 5 $ 430,000 Imperial Low 493 4 $ 237,000
Kim Low 916 6 $ 399,000
La Mar Low 1603 10 $ 638,000
Lazaneo Low 351 3 $ 163,000
Lilac Low 950 5 $ 342,000
Linda Vista Low 363 3 $ 144,000
Longdown Low 332 3 $ 143,000
Mariani Low 555 4 $ 339,000
Martinwood Low 548 4 $ 210,000
390
CC 03-03-2026 Searchable Packet
390 of 495
Cupertino Storm Drain Master Plan
Chapter 5: Cupertino System Evaluation
September, 2018 5-6 Schaaf & Wheeler

CONSULTING CIVIL ENGINEERS

Project Priority Project Length Total MH # Total Project Cost1 Mary Low 432 4 $ 276,000
Merritt Low 934 6 $ 511,000
Meteor Low 542 4 $ 197,000
Miramonte Low 686 7 $ 319,000
Norwich Low 2909 10 $ 1,311,000
Palo Vista Low 649 6 $ 339,000
Par Three Low 201 2 $ 80,000
Parlett Low 514 2 $ 175,000
Pendergast Low 824 2 $ 356,000
Phar Lap 1 Low 1397 9 $ 607,000
Phar Lap 2 Low 1229 5 $ 480,000
Plum Tree Low 762 4 $ 272,000
Portal Low 1847 10 $ 778,000
Richwood Low 1180 6 $ 419,000
Rivercrest Low 208 2 $ 205,000
Scofield Low 1903 7 $ 787,000
Somerset Low 617 3 $ 217,000
St Joseph Low 258 3 $ 118,000
Stevens Canyon Low 281 4 $ 148,000
Stevens Creek Low 11439 66 $ 7,312,000
Suisun Low 391 4 $ 189,000
Swallow Low 192 2 $ 93,000
Terrace Low 1034 5 $ 396,000
Torre Low 1028 6 $ 445,000
United Place Low 203 3 $ 98,000
Vallco Parkway 1 Low 441 3 $ 216,000
Vallco Parkway 2 Low 384 5 $ 199,000
Vallco Parkway 3 Low 838 5 $ 429,000
Valley Green 1 Low 502 3 $ 198,000
Valley Green 2 Low 349 3 $ 161,000
Voss Low 809 4 $ 302,000
Wheaton Low 572 3 $ 204,000
White Fir Low 116 2 $ 57,000
Wildflower Low 162 2 $ 73,000
Wolfe Low 1315 7 $ 543,000
Wunderlich Low 1778 6 $ 657,000

1. Total Project Cost rounded to the nearest thousand

5.7. Green Infrastructure
The 2015 MRP section C.3.j includes development of a Green Infrastructure Program Plan to include LID (Low Impact Development) design on public and private lands, including streets, roads, storm drains and other storm drain infrastructure elements. The Plan is intended to act as a roadmap to turn the City’s ‘gray’ infrastructure into ‘green’. Additionally, the intent of the Plan is to provide reasonable assurance that the TMDL wasteload 391
CC 03-03-2026 Searchable Packet
391 of 495

7. From the 2020 Fiber Optic
Master Plan

7. FIBER
FY 2023-24 CIP 5-Year Plan
392
CC 03-03-2026 Searchable Packet
392 of 495
City of Cupertino | Fiber Optic Master Plan | August 2020

73 Appendix D: Proposed Future Routes

393
CC 03-03-2026 Searchable Packet
393 of 495
City of Cupertino | Fiber Optic Master Plan | August 2020

74 Appendix E: Fiber Count and Ownership

394
CC 03-03-2026 Searchable Packet
394 of 495

8. From the 2023 Building
Condition Assessment Report
(DRAFT)

8. BCA
FY 2023-24 CIP 5-Year Plan

8. From the Facility Condition
Assessment report
395
CC 03-03-2026 Searchable Packet
395 of 495
Building Condition Assessment Report, February 2023

SUMMARY
Location Name
Current
Repair Cost
Escalated
Repair Costs
Blackberry Farms Café $352,400 $426,440
Blackberry Farms Pool Pump Buildings 1 & 2, Lifeguard Bldg., and Kiosk $221,800 $262,590 Blackberry Farms Trail Auxiliary Building $78,140 $92,230 Blackberry Farms Trail Restroom $40,340 $47,610
Blackberry Farms Retreat Center & Garage $237,370 $280,950 Blesch House $336,340 $397,250
Byrne Ave. House $74,360 $87,780
City Hall $5,514,620 $6,400,930
City Hall Annex $2,075,040 $2,450,300
Community Hall $602,660 $701,580
Creekside Park Recreation Building $251,100 $294,520
Jollyman Park Restroom $57,630 $68,040
Kennedy Sports Field Restroom $392,560 $463,280
Library $4,491,090 $5,236,410
Linda Vista Park Restroom & Shed $50,360 $59,450
McClellan Ranch Preserve 4H Building $104,160 $125,560
McClellan Ranch Preserve Barn, Barn Shed, Blacksmith & Milk Barn Bldgs. $315,160 $373,250 McClellan Ranch Preserve Nature Museum and Ranch House/Gift Shop $431,280 $515,660 Memorial Park Gazebo $13,520 $15,960
Memorial Park Restrooms (2) and Sheds (2) $194,880 $230,060 Monta Vista - Gymnastics Building $1,571,600 $1,834,880 Monta Vista - Pre-School Building $530,990 $604,870
Portal Park Recreation Building & Restrooms $198,290 $233,370 Quinlan Community Center $4,460,440 $5,245,100
Senior Center $1,881,970 $2,169,230
Service Center Welding Bldg., Shops & Mechanical Bldg, Administration Bldg. $2,026,380 $2,381,950 Sports Center $1,986,900 $2,300,830
Traffic Maintenance Yard - Buildings 1 & 2 $186,200 $223,780 Wilson Park Recreation Bldg, Restroom and Snack Shack $219,300 $258,870 Total $28,909,270 $33,797,360

Page 1 of 1 ends

CC 03-03-2026 Searchable Packet
396 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1012 Blackberry Farms Café D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 200A (24 ckts, indoor,
1P) load center is
approaching the end of its
expected useful life.

Replace the existing load
center with a new load
center.
$5,850 $6,910
1011 Blackberry Farms Café D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts,
120/240V, 3P) panelboard
is approaching the end of
its expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,540 $20,700
1017 Blackberry Farms Café D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 400A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$22,320 $26,340
1007 Blackberry Farms Café D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 800A switchboard is
approaching the end of its
expected useful life.

Replace the existing
switchboard with a new
switchboard.
$31,720 $37,430
1006 Blackberry Farms Café D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$115,290 $136,050
1024 Blackberry Farms Café B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Existing door frames are
deteriorated.

Replace door frame,
reinstall the door and its
associated hardware.
$5,560 $6,570
828 Blackberry Farms Café B2010 - Exterior Walls 4 - Necessary - Long Term (3-4 Years)
CMU walls are showing
signs of wear.

Clean and repaint CMU
walls.
$18,480 $22,740
1025 Blackberry Farms Café C2030 - Flooring 4 - Necessary - Long Term (3-4 Years)
Epoxy is approaching the
end of its useful life.

Remove the existing epoxy
and replace.
$78,540 $96,610
1005 Blackberry Farms Café D3030 - Cooling Systems 5 - Potential - Long Term (4- 5 Years)
Direct/indirect (4-ton)
evaporative cooler with
gas/electric heat is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$57,100 $73,090
Blackberry Farms Café $352,400 $426,440

Page 1 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
397
CC 03-03-2026 Searchable Packet
397 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
956 Blackberry Farms Pool
Pump Building 1
D3060 - Ventilation 1 - Immediate (0-1 Years) Sidewall propeller fan is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$10,860 $11,730
815 Blackberry Farms Pool
Pump Building 2
A4010 - Standard Slabs on
Grade
3 - Impending (2-3 Years)
The concrete pad has major
cracks and divots that
present tripping hazards.

Repair the concrete pad to
eliminate tripping hazards.
$8,210 $9,690
1039 Blackberry Farms Pool
Pump Building 2
C2010 - Wall Finishes 3 - Impending (2-3 Years) Grout is damaged and deteriorating on the tiled
walls.

Clean and regrout tiles. $61,590 $72,680
810 Blackberry Farms Pool
Pump Building 1
C2030 - Flooring 3 - Impending (2-3 Years) Epoxy is approaching the end of its useful life.

Remove the existing epoxy
and replace.
$41,590 $49,080
1027 Blackberry Farms Pool
Pump Building 1
C2030 - Flooring 3 - Impending (2-3 Years) Grout is damaged and deteriorating on the tiled
floor.

Clean and regrout tiles. $4,950 $5,850
813 Blackberry Farms Pool
Pump Building 2
C2030 - Flooring 3 - Impending (2-3 Years) Epoxy is approaching the end of its useful life.

Remove the existing epoxy
and replace.
$22,190 $26,190
959 Blackberry Farms Pool
Pump Building 1
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (40 ckts, 120/240,
1P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$23,650 $27,910
980 Blackberry Farms Pool
Pump Building 2
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
962 Blackberry Farms Pool
Pump Building 1
D2010 - Domestic Water
Distribution
4 - Necessary - Long Term
(3-4 Years)
Gas fired water heater
more than 75 Gal is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$23,810 $29,290
816 Blackberry Farms
Lifeguard Building
B2010 - Exterior Walls
5 - Potential - Long Term (4-
5 Years)
Trim is worn and should
be replaced.

Replace trim and finish to
match. Replace at the
same time as siding.
$950 $1,220

Page 2 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
398
CC 03-03-2026 Searchable Packet
398 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
831 Blackberry Farms Kiosk B2050 - Exterior Doors and
Grilles
5 - Potential - Long Term (4-
5 Years)
Metal door is damaged or
deteriorated.

Repair door and repaint. $3,710 $4,750
1026 Blackberry Farms Kiosk C2030 - Flooring 5 - Potential - Long Term (4- 5 Years)
Sealed concrete floor is
approaching the end of its
useful life.

Repair and refinish the
concrete floor.
$2,480 $3,180
Blackberry Farms Pool Pump Buildings 1 & 2, Lifeguard Bldg., and Kiosk $221,800 $262,590 808 Blackberry Farms Golf
Course Maintenance
Building
C2030 - Flooring 3 - Impending (2-3 Years) Ceramic tile floor is approaching the end of its
useful life.

Remove the existing
ceramic tile flooring and
replace.
$70 $90
949 Blackberry Farms Golf
Course Maintenance
Building
D3060 - Ventilation 3 - Impending (2-3 Years) Roof/sidewall ventilator is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,270
950 Blackberry Farms Golf
Course Maintenance
Building
D3060 - Ventilation 3 - Impending (2-3 Years) Roof/sidewall ventilator is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,270
Blackberry Farms Golf Course Maintenance Building $12,390 $14,630 817 Blackberry Farms Trail
Auxiliary Building
B1020 - Roof Construction 3 - Impending (2-3 Years) Wood roof framing and decking are in poor
condition.

Remove and replace wood
roof framing and decking.
$46,820 $55,250
822 Blackberry Farms Trail
Auxiliary Building
B2010 - Exterior Walls 3 - Impending (2-3 Years) Wood board siding is approaching the end of its
useful life.

Replace or repair the
existing wood siding.

Place a new siding over
building paper and
plywood sheathing.
$18,730 $22,110

Page 3 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
399
CC 03-03-2026 Searchable Packet
399 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
820 Blackberry Farms Trail
Auxiliary Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (120/208V) all-in-
one combination service
entrance pedestal is
approaching the end of its
expected useful life.

Replace the existing all-in-
one combination service
entrance device with a new
all-in-one combination
service entrance device.
$7,890 $9,320
819 Blackberry Farms Trail
Auxiliary Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
Blackberry Farms Trail Auxiliary Building $78,140 $92,230 827 Blackberry Farms Trail
Restroom
B1020 - Roof Construction 3 - Impending (2-3 Years) Wood roof framing and decking are in poor
condition.

Remove and replace wood
roof framing and decking.
$22,190 $26,190
821 Blackberry Farms Trail
Restroom
B2010 - Exterior Walls 3 - Impending (2-3 Years) Wood board siding is approaching the end of its
useful life.

Replace or repair the
existing wood siding.

Place a new siding over
building paper and
plywood sheathing.
$8,880 $10,480
824 Blackberry Farms Trail
Restroom
B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Exterior wood entrance
door, frame and hardware
is approaching the end of
its useful life.

Replace wood door, frame,
and hardware.
$9,270 $10,940
Blackberry Farms Trail Restroom $40,340 $47,610
807 Blackberry Farms Retreat
Center & Garage
B2010 - Exterior Walls 3 - Impending (2-3 Years) Trim is worn and should be replaced.

Replace trim and finish to
match. Replace at the
same time as siding.
$50 $60
1030 Blackberry Farms Retreat
Center & Garage
C2030 - Flooring 3 - Impending (2-3 Years) Ceramic tile floor is approaching the end of its
useful life.

Remove the existing
ceramic tile flooring and
replace.
$2,450 $2,900

Page 4 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
400
CC 03-03-2026 Searchable Packet
400 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
803 Blackberry Farms Retreat
Center & Garage
C2030 - Flooring 3 - Impending (2-3 Years) Rolled carpeting is approaching the end of its
useful life.

Remove existing rolled
carpeting and replace it
with new 40 oz. nylon
carpet.
$7,400 $8,740
1028 Blackberry Farms Retreat
Center & Garage
C2030 - Flooring 3 - Impending (2-3 Years) Sheet vinyl is approaching the end of its useful life.

Remove the existing sheet
vinyl and replace.
$2,160 $2,550
938 Blackberry Farms Retreat
Center & Garage
D2010 - Domestic Water
Distribution
3 - Impending (2-3 Years) Gas fired water heater less
than 75 Gal is approaching
the end of its expected
useful life.

Provide equipment
replacement and
installation.
$12,700 $14,990
805 Blackberry Farms Retreat
Center & Garage
D2030 - Building Support
Plumbing Systems
3 - Impending (2-3 Years) Evidence of leaks at roof
drains & overflow drains
with damage to soffit
around downspout
penetration.

Replace roof & overflow
drains & accessories
including downspout
through soffit.
$10,790 $12,740
943 Blackberry Farms Retreat
Center & Garage
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (120/208V) all-in-
one combination service
entrance pedestal is
approaching the end of its
expected useful life.

Replace the existing all-in-
one combination service
entrance device with a new
all-in-one combination
service entrance device.
$7,890 $9,320
944 Blackberry Farms Retreat
Center & Garage
D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$92,790 $109,500
941 Blackberry Farms Retreat
Center & Garage
D5040 - Lighting 3 - Impending (2-3 Years)
The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$2,190 $2,590

Page 5 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
401
CC 03-03-2026 Searchable Packet
401 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1029 Blackberry Farms Retreat
Center & Garage
E2010 - Fixed Furnishings 3 - Impending (2-3 Years) The existing casework is at or is approaching the end
of its useful life.

Replace original wood
cabinets and countertops.
$83,170 $98,150
1031 Blackberry Farms Retreat
Center & Garage
C2030 - Flooring 4 - Necessary - Long Term
(3-4 Years)
Carpet tile is missing or
damaged.

Replace carpet tile. $15,780 $19,410
Blackberry Farms Retreat Center & Garage $237,370 $280,950 734 Blesch House B2010 - Exterior Walls 3 - Impending (2-3 Years) Wood board siding is approaching the end of its
useful life.

Replace or repair the
existing wood siding.

Place a new siding over
building paper and
plywood sheathing.
$67,530 $79,690
1035 Blesch House B3020 - Roof
Appurtenances
3 - Impending (2-3 Years) Rain leaders/gutters are
damaged and leak.

Repair, replace rain
leaders/gutters.
$9,270 $10,940
735 Blesch House C2010 - Wall Finishes 3 - Impending (2-3 Years) Painted gypsum wallboard is showing signs of wear.

Patch and paint the
gypsum wallboard.
$38,510 $45,450
1034 Blesch House C2010 - Wall Finishes 3 - Impending (2-3 Years) Paneling is not in serviceable condition.

Remove and replace
existing wood wall panels.
$1,240 $1,470
1033 Blesch House C2030 - Flooring 3 - Impending (2-3 Years) Ceramic tile floor is approaching the end of its
useful life.

Remove the existing
ceramic tile flooring and
replace.
$24,420 $28,820
738 Blesch House C2030 - Flooring 3 - Impending (2-3 Years) Rolled carpeting is approaching the end of its
useful life.

Remove existing rolled
carpeting and replace it
with new 40 oz. nylon
carpet.
$24,640 $29,080
736 Blesch House C2030 - Flooring 3 - Impending (2-3 Years) Sheet vinyl is approaching the end of its useful life.

Remove the existing sheet
vinyl and replace.
$1,580 $1,870
642 Blesch House D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550

Page 6 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
402
CC 03-03-2026 Searchable Packet
402 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1156 Blesch House D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$150,420 $177,500
1155 Blesch House D5040 - Lighting 3 - Impending (2-3 Years) The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$10,910 $12,880
638 Blesch House D3020 - Heating Systems 5 - Potential - Long Term (4- 5 Years)
Radiant wall heater is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$1,560 $2,000
640 Blesch House D3020 - Heating Systems 5 - Potential - Long Term (4- 5 Years)
Radiant wall heater is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$1,560 $2,000
Blesch House $336,340 $397,250
800 Byrne Ave. House B2020 - Exterior Windows 3 - Impending (2-3 Years) Wood window is approaching the end of its
useful life.

Replace wood window. $6,160 $7,270
1037 Byrne Ave. House C2030 - Flooring 3 - Impending (2-3 Years) Sheet vinyl is approaching the end of its useful life.

Remove the existing sheet
vinyl and replace.
$15,600 $18,410
1041 Byrne Ave. House C2030 - Flooring 3 - Impending (2-3 Years) Sheet vinyl is approaching the end of its useful life.

Remove the existing sheet
vinyl and replace.
$25,340 $29,910
1040 Byrne Ave. House C2030 - Flooring 3 - Impending (2-3 Years) Wood flooring shows signs
of wear.

Sand, repair and refinish
the wood flooring.
$3,020 $3,570

Page 7 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
403
CC 03-03-2026 Searchable Packet
403 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
929 Byrne Ave. House D3020 - Heating Systems 3 - Impending (2-3 Years) Gas-fired furnace less than 250 Mbh is approaching
the end of its expected
useful life.

Provide equipment
replacement and
installation.
$16,350 $19,300
917 Byrne Ave. House D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years)
The 100A (120/240V, 1P) all-
in-one combination service
entrance device is
approaching the end of its
expected useful life.

Replace the existing all-in-
one combination service
entrance device with a new
all-in-one combination
service entrance device.
$7,890 $9,320
Byrne Ave. House $74,360 $87,780
141 City Hall D3030 - Cooling Systems 1 - Immediate (0-1 Years) Split system (2-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$22,860 $24,690
1157 City Hall D4010 - Fire Suppression 1 - Immediate (0-1 Years) The existing fire sprinkler system is past its expected
useful life.

Replace fire sprinkler
system.
$1,064,250 $1,149,400
163 City Hall D7050 - Detection and
Alarm
1 - Immediate (0-1 Years) The existing fire alarm
system is approaching the
end of its useful life and
should be replaced.

Replace the existing fire
alarm system with a
complete, site-wide, fully
addressable fire alarm
system.
$425,700 $459,760
321 City Hall D3020 - Heating Systems 2 - Crucial (1-2 Years) Medium boiler is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$80,070 $90,480
170 City Hall D3030 - Cooling Systems 2 - Crucial (1-2 Years) Split system (3-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$26,120 $29,520

Page 8 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
404
CC 03-03-2026 Searchable Packet
404 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
165 City Hall D3050 - Facility HVAC
Distribution Systems
2 - Crucial (1-2 Years) Air handler / make up air
unit (17.5-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$69,300 $78,310
166 City Hall D3050 - Facility HVAC
Distribution Systems
2 - Crucial (1-2 Years) Air handler / make up air
unit (17.5-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$69,300 $78,310
137 City Hall D3060 - Ventilation 2 - Crucial (1-2 Years) Utility exhaust fan is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $17,430
140 City Hall D3060 - Ventilation 2 - Crucial (1-2 Years) Utility exhaust fan is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $17,430
1062 City Hall B2010 - Exterior Walls 3 - Impending (2-3 Years) The top of the parapet wall is not protected.

Provide a sheet metal cap. $15,420 $18,200
332 City Hall B2020 - Exterior Windows 3 - Impending (2-3 Years) Aluminum storefront is at or approaching the end of
its useful life.

Replace with 3/8" plate
glass in 2"x4" aluminum
frame.
$121,970 $143,930
334 City Hall B2020 - Exterior Windows 3 - Impending (2-3 Years) Aluminum window is approaching/past it's
expected useful life.

Replace aluminum
window.
$73,910 $87,220
335 City Hall B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Exterior aluminum
(storefront) entrance door
is approaching the end of
its useful life.

Replace aluminum door
(storefront).
$91,460 $107,930
1063 City Hall B3010 - Roofing 3 - Impending (2-3 Years) Modified bitumen roofing is at or approaching the
end of its useful life.

Replace modified bitumen
roofing.
$116,890 $137,940
329 City Hall B3010 - Roofing 3 - Impending (2-3 Years) Wood fascia and trim chipped and have peeling
paint.

Clean, repair, and paint the
trim and/or fascia.
$46,580 $54,970

Page 9 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
405
CC 03-03-2026 Searchable Packet
405 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
308 City Hall C2030 - Flooring 3 - Impending (2-3 Years) Rolled carpeting is approaching the end of its
useful life.

Remove existing rolled
carpeting and replace it
with new 40 oz. nylon
carpet.
$443,430 $523,250
299 City Hall C2030 - Flooring 3 - Impending (2-3 Years) Vinyl composition tile is approaching the end of its
useful life.

Remove the existing vinyl
composition tile and
replace.
$11,000 $12,980
315 City Hall C2030 - Flooring 3 - Impending (2-3 Years) Wood wall base is approaching the end of its
useful life.

Replace the wood wall
base.
$70 $90
310 City Hall C2050 - Ceiling Finishes 3 - Impending (2-3 Years) Existing suspended ceiling grid is approaching the
end of its expected useful
life.

Replace the ceiling grid,
including the tiles.
$120,120 $141,750
328 City Hall D1010 - Vertical
Conveying Systems
3 - Impending (2-3 Years) 2 floor hydraulic elevator
is approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
$77,010 $90,880
305 City Hall D1010 - Vertical
Conveying Systems
3 - Impending (2-3 Years) Geared elevator motor is
leaking.

Provide equipment repair. $3,110 $3,670
304 City Hall D2010 - Domestic Water
Distribution
3 - Impending (2-3 Years) Water leakage from
plumbing fixture.

Investigate cause of leak
and provide repairs and
adjustments as necessary.
$630 $750
159 City Hall D2060 - Process Support
Plumbing Systems
3 - Impending (2-3 Years) Air compressor is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $18,200
133 City Hall D3030 - Cooling Systems 3 - Impending (2-3 Years) Cooling tower (120-ton) is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$84,700 $99,950
172 City Hall D3030 - Cooling Systems 3 - Impending (2-3 Years) Outdoor condensing unit (5-ton) is approaching the
end of its expected useful
life.

Provide equipment
replacement and
installation.
$20,030 $23,640

Page 10 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
406
CC 03-03-2026 Searchable Packet
406 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
143 City Hall D3030 - Cooling Systems 3 - Impending (2-3 Years) Split system (2-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$22,860 $26,980
160 City Hall D3030 - Cooling Systems 3 - Impending (2-3 Years) Water cooled chiller (60- ton) is approaching the
end of its expected useful
life.

Provide equipment
replacement and
installation.
$298,090 $351,750
161 City Hall D3050 - Facility HVAC
Distribution Systems
3 - Impending (2-3 Years) Hydronic pump (100 gpm)
and motor (5-hp) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$11,870 $14,010
162 City Hall D3050 - Facility HVAC
Distribution Systems
3 - Impending (2-3 Years) Hydronic pump (100 gpm)
and motor (5-hp) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$11,870 $14,010
317 City Hall D3050 - Facility HVAC
Distribution Systems
3 - Impending (2-3 Years) Hydronic pump (100 gpm)
and motor (5-hp) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$11,870 $14,010
318 City Hall D3050 - Facility HVAC
Distribution Systems
3 - Impending (2-3 Years) Hydronic pump (100 gpm)
and motor (5-hp) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$11,870 $14,010
134 City Hall D3060 - Ventilation 3 - Impending (2-3 Years) Roof/sidewall ventilator is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,270
135 City Hall D3060 - Ventilation 3 - Impending (2-3 Years) Roof/sidewall ventilator is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,270
138 City Hall D3060 - Ventilation 3 - Impending (2-3 Years) Roof/sidewall ventilator is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,270

Page 11 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
407
CC 03-03-2026 Searchable Packet
407 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
319 City Hall D5010 - Facility Power
Generation
3 - Impending (2-3 Years) The existing diesel
generator is undersized for
required loading.

Replace the existing
generator with an upsized
new generator.
$199,220 $235,080
155 City Hall D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
323 City Hall D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
157 City Hall D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 1600A switchboard is
approaching the end of its
expected useful life.

Replace the existing
switchboard with a new
switchboard.
$60,220 $71,060
150 City Hall D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 200A (24 ckts, indoor,
1P) load center is
approaching the end of its
expected useful life.

Replace the existing load
center with a new load
center.
$5,850 $6,910
151 City Hall D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 200A (24 ckts, indoor,
1P) load center is
approaching the end of its
expected useful life.

Replace the existing load
center with a new load
center.
$5,850 $6,910
148 City Hall D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
149 City Hall D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020

Page 12 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
408
CC 03-03-2026 Searchable Packet
408 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
158 City Hall D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
164 City Hall D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
313 City Hall D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
324 City Hall D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
153 City Hall D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$933,140 $1,101,110
1119 City Hall D5040 - Lighting 3 - Impending (2-3 Years) The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$43,570 $51,420
296 City Hall D6010 - Data
Communications
3 - Impending (2-3 Years) Data distribution
infrastructure is awkward
and will need to be
reworked in many
locations in order to
accommodate building
refurbishment/renovation.

Rework the data
distribution to both utilize
and accommodate building
refurbishment/renovation.
$6,750 $7,970

Page 13 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
409
CC 03-03-2026 Searchable Packet
409 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
229 City Hall B2010 - Exterior Walls 4 - Necessary - Long Term (3-4 Years)
Wood board siding is
approaching the end of its
useful life.

Replace or repair the
existing wood siding.

Place a new siding over
building paper and
plywood sheathing.
$108,410 $133,350
303 City Hall C2010 - Wall Finishes 4 - Necessary - Long Term (3-4 Years)
Interior wall paint is in
need of refresh.

Paint interior walls with 2
coat finish (includes
surface prep and primer).
$133,410 $164,100
298 City Hall E2010 - Fixed Furnishings 4 - Necessary - Long Term (3-4 Years)
Plastic Laminate Casework
is at or will be approaching
the end of its expected
useful life.

Provide new plastic
laminate casework (upper,
lower, and countertop)
$41,410 $50,940
309 City Hall C1030 - Interior Doors
5 - Potential - Long Term (4-
5 Years)
Interior wood door, frame
and hardware is at or
approaching the end of its
useful life.

Replace interior wood
door, frame and hardware.
$443,430 $567,600
City Hall $5,514,620 $6,400,930
192 City Hall Annex D3020 - Heating Systems 1 - Immediate (0-1 Years) Gas-fired furnace less than 250 Mbh is approaching
the end of its expected
useful life.

Provide equipment
replacement and
installation.
$16,350 $17,660
197 City Hall Annex D3030 - Cooling Systems 1 - Immediate (0-1 Years) Split system (2-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$22,860 $24,690
194 City Hall Annex D7050 - Detection and
Alarm
1 - Immediate (0-1 Years) The existing fire alarm
system is approaching the
end of its useful life and
should be replaced.

Replace the existing fire
alarm system with a
complete, site-wide, fully
addressable fire alarm
system.
$118,260 $127,730
270 City Hall Annex B2020 - Exterior Windows 3 - Impending (2-3 Years) Metal window is approaching the end of its
useful life.

Replace metal window. $147,810 $174,420

Page 14 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
410
CC 03-03-2026 Searchable Packet
410 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1066 City Hall Annex B2020 - Exterior Windows 3 - Impending (2-3 Years) Stained art glass panels in refurbished windows are
in need of restoration.

Refurbish stained glass
panels in windows.
$300,250 $354,300
1067 City Hall Annex B3010 - Roofing 3 - Impending (2-3 Years) Clay tile roofing is at or approaching end of
expected useful service life.

Remove and replace clay
tile roofing.
$371,390 $438,250
265 City Hall Annex B3060 - Horizontal
Openings
3 - Impending (2-3 Years) Skylights are leaking,
damaged and discolored.

Remove the existing
skylight and replace it with
a new skylight.
$10,410 $12,290
264 City Hall Annex C2010 - Wall Finishes 3 - Impending (2-3 Years) Vinyl wall covering is approaching the end of its
useful life.

Install a new vinyl wall
covering.
$117,020 $138,090
262 City Hall Annex C2030 - Flooring 3 - Impending (2-3 Years) Rolled carpeting is approaching the end of its
useful life.

Remove existing rolled
carpeting and replace it
with new 40 oz. nylon
carpet.
$177,390 $209,330
252 City Hall Annex C2030 - Flooring 3 - Impending (2-3 Years) Sheet vinyl is approaching the end of its useful life.

Remove the existing sheet
vinyl and replace.
$19,490 $23,000
196 City Hall Annex D3030 - Cooling Systems 3 - Impending (2-3 Years) Heat pump is approaching the end of its expected
useful life.

Provide equipment
replacement and
installation.
$22,930 $27,060
846 City Hall Annex D3060 - Ventilation 3 - Impending (2-3 Years) Utility exhaust fan is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $18,200
187 City Hall Annex D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550

Page 15 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
411
CC 03-03-2026 Searchable Packet
411 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
188 City Hall Annex D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
190 City Hall Annex D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
191 City Hall Annex D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
1121 City Hall Annex D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 600A switchboard is
approaching the end of its
expected useful life.

Replace the existing
switchboard with a new
switchboard.
$20,460 $24,150
1122 City Hall Annex D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$351,300 $414,540
1123 City Hall Annex D5040 - Lighting 3 - Impending (2-3 Years) The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$26,150 $30,860
254 City Hall Annex E2010 - Fixed Furnishings 3 - Impending (2-3 Years) Solid Surface countertops are at or are approaching
the end of their useful life.

Remove and replace the
solid surface countertops.
$1,600 $1,890
266 City Hall Annex E2010 - Fixed Furnishings 3 - Impending (2-3 Years) The existing casework is in need of refurbishment.

Repair, refurbish, and
refinish the existing wood
casework and counters.
$15,420 $18,200

Page 16 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
412
CC 03-03-2026 Searchable Packet
412 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
261 City Hall Annex B2050 - Exterior Doors and
Grilles
4 - Necessary - Long Term
(3-4 Years)
Exterior exit door is at or
approaching the end of its
useful life.

Provide new 3' x 7' HM
exterior exit door and
frame with panic hardware
and closer.
$9,650 $11,870
250 City Hall Annex B2050 - Exterior Doors and
Grilles
4 - Necessary - Long Term
(3-4 Years)
Exterior wood entrance
door, frame and hardware
is approaching the end of
its useful life.

Replace wood door, frame,
and hardware.
$13,870 $17,070
268 City Hall Annex C1030 - Interior Doors 4 - Necessary - Long Term (3-4 Years)
Interior wood door is at or
approaching the end of its
useful life.

Replace with new wood
door.
$203,240 $249,990
198 City Hall Annex D3030 - Cooling Systems 4 - Necessary - Long Term (3-4 Years)
Split system (4-ton) with
fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$29,380 $36,140
1065 City Hall Annex C1020 - Interior Windows
5 - Potential - Long Term (4-
5 Years)
Interior fixed steel window
is at or approaching the
end of its useful life.

Replace fixed steel
window.
$27,290 $34,940
267 City Hall Annex C2030 - Flooring
5 - Potential - Long Term (4-
5 Years)
Ceramic tile floor is
approaching the end of its
useful life.

Remove the existing
ceramic tile flooring and
replace.
$18,300 $23,430
City Hall Annex $2,075,040 $2,450,300
177 Community Hall D3030 - Cooling Systems 1 - Immediate (0-1 Years) Rooftop/ground mounted packaged DX AC unit (1-
ton to 3-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $16,660
175 Community Hall D2010 - Domestic Water
Distribution
2 - Crucial (1-2 Years) Electric water heater (20-
gallon) is approaching the
end of its expected useful
life.

Provide equipment
replacement and
installation.
$11,420 $12,910

Page 17 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
413
CC 03-03-2026 Searchable Packet
413 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
179 Community Hall D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (1-
ton to 3-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $17,430
176 Community Hall D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $52,230
178 Community Hall D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $52,230
186 Community Hall D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $52,230
237 Community Hall B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Exterior exit door is at or
approaching the end of its
useful life.

Provide new 3' x 7' HM
exterior exit door and
frame with panic hardware
and closer.
$4,840 $5,720
241 Community Hall C1030 - Interior Doors 3 - Impending (2-3 Years) Interior wood door is in visual need of
refurbishment.

Refurbish and restain the
wood door.
$950 $1,130
238 Community Hall C2010 - Wall Finishes 3 - Impending (2-3 Years) Fabric wall covering is approaching the end of its
useful life.

Install a new fabric wall
covering.
$1,110 $1,310
185 Community Hall D3030 - Cooling Systems 3 - Impending (2-3 Years) Heat pump is approaching the end of its expected
useful life.

Provide equipment
replacement and
installation.
$22,930 $27,060

Page 18 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
414
CC 03-03-2026 Searchable Packet
414 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
181 Community Hall D3030 - Cooling Systems 3 - Impending (2-3 Years) Split system (1-ton) with wall mounted AC and
outdoor condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$16,350 $19,300
182 Community Hall D3030 - Cooling Systems 3 - Impending (2-3 Years) Split system (2-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$22,860 $26,980
1124 Community Hall D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$329,360 $388,650
1126 Community Hall D5040 - Lighting 3 - Impending (2-3 Years) The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$19,630 $23,170
242 Community Hall B2050 - Exterior Doors and
Grilles
4 - Necessary - Long Term
(3-4 Years)
Metal door is damaged or
deteriorated.

Repair door and repaint. $3,710 $4,570
Community Hall $602,660 $701,580
99 Creekside Park Recreation
Building
D7050 - Detection and
Alarm
1 - Immediate (0-1 Years) The existing fire alarm
system is approaching the
end of its useful life and
should be replaced.

Replace the existing fire
alarm system with a
complete, site-wide, fully
addressable fire alarm
system.
$32,350 $34,940
32 Creekside Park Recreation
Building
B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Exterior doors, frames and
hardware are approaching
the end of their useful life.

Replace the exterior doors,
frames and hardware.
$21,580 $25,470

Page 19 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
415
CC 03-03-2026 Searchable Packet
415 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
35 Creekside Park Recreation
Building
B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Exterior doors, frames and
hardware are approaching
the end of their useful life.

Replace the exterior doors,
frames and hardware.
$10,790 $12,740
36 Creekside Park Recreation
Building
C2030 - Flooring 3 - Impending (2-3 Years) Sheet vinyl is approaching the end of its useful life.

Remove the existing sheet
vinyl and replace.
$38,980 $46,000
29 Creekside Park Recreation
Building
D3060 - Ventilation 3 - Impending (2-3 Years) Ceiling exhaust fan is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$2,160 $2,550
1137 Creekside Park Recreation
Building
D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$96,070 $113,370
107 Creekside Park Recreation
Building
D5040 - Lighting 3 - Impending (2-3 Years)
The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$21,790 $25,720
27 Creekside Park Recreation
Building
G2030 - Pedestrian Plazas
and Walkways
3 - Impending (2-3 Years) Caulking is missing /
damaged.

Replace caulking. $2,790 $3,300
26 Creekside Park Recreation
Building
B3020 - Roof
Appurtenances
4 - Necessary - Long Term
(3-4 Years)
Rain leaders/gutters are
damaged and leak.

Repair, replace rain
leaders/gutters.
$12,030 $14,800
38 Creekside Park Recreation
Building
C2030 - Flooring 4 - Necessary - Long Term
(3-4 Years)
Sealed concrete floor is
approaching the end of its
useful life.

Repair and refinish the
concrete floor.
$3,870 $4,770
37 Creekside Park Recreation
Building
C2030 - Flooring 4 - Necessary - Long Term
(3-4 Years)
Wood wall base is
approaching the end of its
useful life.

Replace the wood wall
base.
$3,330 $4,100

Page 20 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
416
CC 03-03-2026 Searchable Packet
416 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
34 Creekside Park Recreation
Building
D2010 - Domestic Water
Distribution
4 - Necessary - Long Term
(3-4 Years)
Swing faucet is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$2,160 $2,660
33 Creekside Park Recreation
Building
D2010 - Domestic Water
Distribution
5 - Potential - Long Term (4-
5 Years)
Electric water heater (10-
gallon) is approaching the
end of its expected useful
life.

Provide equipment
replacement and
installation.
$3,200 $4,100
Creekside Park Recreation Building $251,100 $294,520
1044 Jollyman Park Restroom B2010 - Exterior Walls 3 - Impending (2-3 Years) Exterior cement plaster walls are damaged and
spalling in several areas.

Clean, patch, and repair
the cement plaster wall
finish.
$120 $150
292 Jollyman Park Restroom B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Exterior doors, frames and
hardware are approaching
the end of their useful life.

Replace the exterior doors,
frames and hardware.
$10,790 $12,740
1043 Jollyman Park Restroom B3020 - Roof
Appurtenances
3 - Impending (2-3 Years) Rain leaders/gutters are
damaged and leak.

Repair, replace rain
leaders/gutters.
$2,320 $2,740
294 Jollyman Park Restroom C2010 - Wall Finishes 3 - Impending (2-3 Years) Fiberglass reinforced paneling is at or
approaching the end of its
useful life.

Install and replace the
fiberglass reinforced
paneling.
$11,110 $13,110
1042 Jollyman Park Restroom C2030 - Flooring 3 - Impending (2-3 Years) Epoxy is approaching the end of its useful life.

Remove the existing epoxy
and replace.
$13,870 $16,370
222 Jollyman Park Restroom D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
223 Jollyman Park Restroom D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550

Page 21 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
417
CC 03-03-2026 Searchable Packet
417 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
225 Jollyman Park Restroom D5040 - Lighting 3 - Impending (2-3 Years) The exterior wall mounted fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$6,550 $7,730
227 Jollyman Park Restroom D5040 - Lighting 3 - Impending (2-3 Years) The light fixtures utilize inefficient incandescent
lamps.

Replace existing
incandescent fixtures with
LED fixtures.
$3,470 $4,100
Jollyman Park Restroom $57,630 $68,040
1051 Kennedy Sports Field
Restroom
B2010 - Exterior Walls 3 - Impending (2-3 Years) Concrete masonry units exterior walls are damaged
and in need of repair.

Repair Concrete masonry
units exterior walls and
repaint.
$110,860 $130,820
1057 Kennedy Sports Field
Restroom
B2020 - Exterior Windows 3 - Impending (2-3 Years) Fixed wood window needs restoration.

Remove window, restore
and reinstall.
$21,580 $25,470
1047 Kennedy Sports Field
Restroom
B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Exterior doors, frames and
hardware are approaching
the end of their useful life.

Replace the exterior doors,
frames and hardware.
$21,580 $25,470
1053 Kennedy Sports Field
Restroom
B3010 - Roofing 3 - Impending (2-3 Years) Existing insulation is insufficient.

Add R30 Batt insulation. $4,640 $5,480
1055 Kennedy Sports Field
Restroom
B3010 - Roofing 3 - Impending (2-3 Years) Metal Roofing is at or approaching end of
expected useful service life.

Remove and replace metal
roofing.
$53,140 $62,710
1049 Kennedy Sports Field
Restroom
B3060 - Horizontal
Openings
3 - Impending (2-3 Years) Skylights are leaking,
damaged and discolored.

Remove the existing
skylight and replace it with
a new skylight.
$11,110 $13,110
1046 Kennedy Sports Field
Restroom
C2010 - Wall Finishes 3 - Impending (2-3 Years) Interior wall paint is in need of refresh.

Paint interior walls with 2
coat finish (includes
surface prep and primer).
$8,700 $10,270
1048 Kennedy Sports Field
Restroom
C2030 - Flooring 3 - Impending (2-3 Years) Epoxy is approaching the end of its useful life.

Remove the existing epoxy
and replace.
$27,740 $32,740

Page 22 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
418
CC 03-03-2026 Searchable Packet
418 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1054 Kennedy Sports Field
Restroom
C2030 - Flooring 3 - Impending (2-3 Years) Sealed concrete floor is approaching the end of its
useful life.

Repair and refinish the
concrete floor.
$9,270 $10,940
849 Kennedy Sports Field
Restroom
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
853 Kennedy Sports Field
Restroom
D5040 - Lighting 3 - Impending (2-3 Years)
The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$15,270 $18,020
1139 Kennedy Sports Field
Restroom
D5040 - Lighting 3 - Impending (2-3 Years) The light fixtures utilize inefficient incandescent
lamps.

Replace existing
incandescent fixtures with
LED fixtures.
$8,070 $9,530
1050 Kennedy Sports Field
Restroom
E2010 - Fixed Furnishings 3 - Impending (2-3 Years) Plastic Laminate Casework is at or will be approaching
the end of its expected
useful life.

Provide new plastic
laminate casework (upper,
lower, and countertop)
$82,790 $97,700
Kennedy Sports Field Restroom $392,560 $463,280
62 Library D7050 - Detection and
Alarm
1 - Immediate (0-1 Years) The existing fire alarm
system is approaching the
end of its useful life and
should be replaced.

Replace the existing fire
alarm system with a
complete, site-wide, fully
addressable fire alarm
system.
$997,710 $1,077,530
3 Library D3030 - Cooling Systems 2 - Crucial (1-2 Years) Split system with wall mounted AC and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,810 $17,870
18 Library B2020 - Exterior Windows 3 - Impending (2-3 Years) Aluminum window is approaching/past it's
expected useful life.

Replace aluminum
window.
$1,870 $2,210

Page 23 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
419
CC 03-03-2026 Searchable Packet
419 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
21 Library B2020 - Exterior Windows 3 - Impending (2-3 Years) Aluminum window is approaching/past it's
expected useful life.

Replace aluminum
window.
$1,400 $1,660
1 Library B3010 - Roofing 3 - Impending (2-3 Years) Roofing membrane needs a recoating.

Repair and recoat the roof
membrane. Provide a
white (light color)
neoprene coating and
replace the roof membrane
as scheduled.
$790 $940
130 Library B3010 - Roofing 3 - Impending (2-3 Years) Roofing membrane needs a recoating.

Repair and recoat the roof
membrane. Provide a
white (light color)
neoprene coating and
replace the roof membrane
as scheduled.
$790 $940
131 Library B3010 - Roofing 3 - Impending (2-3 Years) Roofing membrane needs a recoating.

Repair and recoat the roof
membrane. Provide a
white (light color)
neoprene coating and
replace the roof membrane
as scheduled.
$6,160 $7,270
132 Library C1030 - Interior Doors 3 - Impending (2-3 Years) Interior door hardware is at or approaching the end
of its useful life.

Replace interior door
hardware.
$1,080 $1,280
22 Library C1030 - Interior Doors 3 - Impending (2-3 Years) Interior hollow metal door is in visual need of
refurbishment.

Refurbish/repair interior
hollow metal door.
$10,480 $12,370
11 Library C1030 - Interior Doors 3 - Impending (2-3 Years) Interior wood door is in visual need of
refurbishment.

Refurbish and restain the
wood door.
$950 $1,130
12 Library C2010 - Wall Finishes 3 - Impending (2-3 Years) Interior wall paint is in need of refresh.

Paint interior walls with 2
coat finish (includes
surface prep and primer).
$289,460 $341,570

Page 24 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
420
CC 03-03-2026 Searchable Packet
420 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
14 Library C2030 - Flooring 3 - Impending (2-3 Years) 6" Vinyl wall base is approaching the end of its
useful life.

Replace the vinyl wall
base.
$1,040 $1,230
23 Library D2010 - Domestic Water
Distribution
3 - Impending (2-3 Years) Porcelain sink is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$7,710 $9,100
25 Library D2010 - Domestic Water
Distribution
3 - Impending (2-3 Years) Porcelain sink is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$7,710 $9,100
56 Library D3020 - Heating Systems 3 - Impending (2-3 Years) Medium boiler is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$80,070 $94,490
55 Library D3050 - Facility HVAC
Distribution Systems
3 - Impending (2-3 Years) Air handler / make up air
unit (17.5-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$69,300 $81,780
1127 Library D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$2,223,050 $2,623,200
1128 Library D5040 - Lighting 3 - Impending (2-3 Years) The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$26,150 $30,860
16 Library E2010 - Fixed Furnishings 3 - Impending (2-3 Years) Plastic laminate countertops are at or are
approaching the end of
their useful life.

Repair or replace plastic
laminate countertops.
$2,230 $2,640
53 Library D3030 - Cooling Systems 4 - Necessary - Long Term (3-4 Years)
Split system (3-ton) with
fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$26,120 $32,130

Page 25 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
421
CC 03-03-2026 Searchable Packet
421 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
4 Library D3060 - Ventilation 4 - Necessary - Long Term (3-4 Years)
Roof exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,790 $8,360
19 Library E2010 - Fixed Furnishings 4 - Necessary - Long Term (3-4 Years)
The existing casework is in
need of refurbishment.

Repair, refurbish, and
refinish the existing wood
casework and counters.
$246,350 $303,020
24 Library E2010 - Fixed Furnishings 4 - Necessary - Long Term (3-4 Years)
The existing casework is in
need of refurbishment.

Repair, refurbish, and
refinish the existing wood
casework and counters.
$468,070 $575,730
Library $4,491,090 $5,236,410
1060 Linda Vista Park Restroom C2030 - Flooring 3 - Impending (2-3 Years) Ceramic tile floor is approaching the end of its
useful life.

Remove the existing
ceramic tile flooring and
replace.
$15,270 $18,020
862 Linda Vista Park Restroom D5020 - Electrical Service and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
1141 Linda Vista Park Restroom D5040 - Lighting 3 - Impending (2-3 Years) The light fixtures utilize inefficient incandescent
lamps.

Replace existing
incandescent fixtures with
LED fixtures.
$2,320 $2,740
1059 Linda Vista Park Restroom G3010 - Water Utilities 3 - Impending (2-3 Years) Outdoor drinking fountain requires repairs.

Repair drinking fountain. $3,710 $4,380
1058 Linda Vista Park Shed B2010 - Exterior Walls 3 - Impending (2-3 Years) CMU walls are showing signs of wear.

Clean and repaint CMU
walls.
$2,320 $2,740
777 Linda Vista Park Shed B3010 - Roofing 3 - Impending (2-3 Years) Asphalt composition roof is in fair to poor condition
with evidence of ponding,
blisters & leaks.

Remove and replace
asphalt composition
shingle roofing.
$7,870 $9,290

Page 26 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
422
CC 03-03-2026 Searchable Packet
422 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
866 Linda Vista Park Shed D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
864 Linda Vista Park Shed D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$7,150 $8,440
1140 Linda Vista Park Shed D5040 - Lighting 3 - Impending (2-3 Years) The light fixtures utilize inefficient incandescent
lamps.

Replace existing
incandescent fixtures with
LED fixtures.
$2,320 $2,740
Linda Vista Park Restroom & Shed $50,360 $59,450
872 McClellan Ranch Preserve
4H Building
D2010 - Domestic Water
Distribution
2 - Crucial (1-2 Years) Small under-counter
electric water heater less
than 10 Gal is approaching
the end of its expected
useful life.

Provide equipment
replacement and
installation.
$3,040 $3,440
1090 McClellan Ranch Preserve
4H Building
B3020 - Roof
Appurtenances
3 - Impending (2-3 Years) Rain leaders/gutters are
damaged and leak.

Repair, replace rain
leaders/gutters.
$2,790 $3,300
1091 McClellan Ranch Preserve
4H Building
C2010 - Wall Finishes 3 - Impending (2-3 Years) Interior wall paint is in need of refresh.

Paint interior walls with 2
coat finish (includes
surface prep and primer).
$3,490 $4,120
1089 McClellan Ranch Preserve
4H Building
C2030 - Flooring 3 - Impending (2-3 Years) Epoxy is approaching the end of its useful life.

Remove the existing epoxy
and replace.
$27,740 $32,740
871 McClellan Ranch Preserve
4H Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550

Page 27 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
423
CC 03-03-2026 Searchable Packet
423 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1088 McClellan Ranch Preserve
4H Building
E2010 - Fixed Furnishings 3 - Impending (2-3 Years) The existing casework is at or is approaching the end
of its useful life.

Replace original wood
cabinets and countertops.
$34,660 $40,900
1092 McClellan Ranch Preserve
4H Building
B3010 - Roofing 5 - Potential - Long Term (4-
5 Years)
Asphalt composition roof
is in fair to poor condition
with evidence of ponding,
blisters & leaks.

Remove and replace
asphalt composition
shingle roofing.
$27,740 $35,510
McClellan Ranch Preserve 4H Building $104,160 $125,560
1094 McClellan Ranch Preserve
Barn
B2010 - Exterior Walls 3 - Impending (2-3 Years) Wood board siding is approaching the end of its
useful life.

Replace or repair the
existing wood siding.

Place a new siding over
building paper and
plywood sheathing.
$73,910 $87,220
1095 McClellan Ranch Preserve
Barn
B3010 - Roofing 3 - Impending (2-3 Years) Asphalt composition roof is in fair to poor condition
with evidence of ponding,
blisters & leaks.

Remove and replace
asphalt composition
shingle roofing.
$92,390 $109,030
1096 McClellan Ranch Preserve
Barn
B3010 - Roofing 3 - Impending (2-3 Years) Wood fascia and trim chipped and have peeling
paint.

Clean, repair, and paint the
trim and/or fascia.
$17,270 $20,380
1098 McClellan Ranch Preserve
Barn Shed
B2010 - Exterior Walls 3 - Impending (2-3 Years) Wood board siding is approaching the end of its
useful life.

Replace or repair the
existing wood siding.

Place a new siding over
building paper and
plywood sheathing.
$17,270 $20,380
1097 McClellan Ranch Preserve
Barn Shed
B3010 - Roofing 3 - Impending (2-3 Years) Asphalt composition roof is in fair to poor condition
with evidence of ponding,
blisters & leaks.

Remove and replace
asphalt composition
shingle roofing.
$32,350 $38,180

Page 28 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
424
CC 03-03-2026 Searchable Packet
424 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1099 McClellan Ranch Preserve
Barn Shed
B3010 - Roofing 3 - Impending (2-3 Years) Wood fascia and trim chipped and have peeling
paint.

Clean, repair, and paint the
trim and/or fascia.
$8,640 $10,200
791 McClellan Ranch Preserve
Blacksmith Shop
B2010 - Exterior Walls 3 - Impending (2-3 Years) Wood board siding is approaching the end of its
useful life.

Replace or repair the
existing wood siding.

Place a new siding over
building paper and
plywood sheathing.
$17,270 $20,380
785 McClellan Ranch Preserve
Milk Barn Building
B2010 - Exterior Walls 3 - Impending (2-3 Years) CMU walls are showing signs of wear.

Clean and repaint CMU
walls.
$70 $90
786 McClellan Ranch Preserve
Milk Barn Building
C2030 - Flooring 3 - Impending (2-3 Years) Epoxy is approaching the end of its useful life.

Remove the existing epoxy
and replace.
$20,800 $24,550
1143 McClellan Ranch Preserve
Milk Barn Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
1142 McClellan Ranch Preserve
Milk Barn Building
D5040 - Lighting 3 - Impending (2-3 Years) The light fixtures utilize inefficient incandescent
lamps.

Replace existing
incandescent fixtures with
LED fixtures.
$4,610 $5,440
1100 McClellan Ranch Preserve
Milk Barn Building
B2050 - Exterior Doors and
Grilles
4 - Necessary - Long Term
(3-4 Years)
Metal door is damaged or
deteriorated.

Repair door and repaint. $7,400 $9,110
787 McClellan Ranch Preserve
Milk Barn Building
C1090 - Interior Specialties 4 - Necessary - Long Term
(3-4 Years)
Toilet partitions have
excessive amounts of rust.

Replace the toilet partitions $18,480 $22,740
McClellan Ranch Preserve Barn, Barn Shed, Blacksmith & Milk Barn Bldgs. $315,160 $373,250

Page 29 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
425
CC 03-03-2026 Searchable Packet
425 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
784 McClellan Ranch Preserve
Environmental Education
Center
B1020 - Roof Construction 3 - Impending (2-3 Years) Wood roof framing and decking are in poor
condition.

Remove and replace wood
roof framing and decking.
$16,950 $20,010
789 McClellan Ranch Preserve
Environmental Education
Center
B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Exterior wood entrance
door is approaching the
end of its useful life.

Replace wood door. $15,420 $18,200
892 McClellan Ranch Preserve
Environmental Education
Center
D3030 - Cooling Systems 4 - Necessary - Long Term
(3-4 Years)
Fan coil unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$10,790 $13,280
893 McClellan Ranch Preserve
Environmental Education
Center
D3030 - Cooling Systems 4 - Necessary - Long Term
(3-4 Years)
Fan coil unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$10,790 $13,280
886 McClellan Ranch Preserve
Environmental Education
Center
D3030 - Cooling Systems 4 - Necessary - Long Term
(3-4 Years)
Split system (2-ton) with
fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$22,860 $28,120
793 McClellan Ranch Preserve
Nature Museum
C2030 - Flooring 3 - Impending (2-3 Years) Vinyl composition tile is approaching the end of its
useful life.

Remove the existing vinyl
composition tile and
replace.
$22,530 $26,590
1102 McClellan Ranch Preserve
Nature Museum
C2050 - Ceiling Finishes 3 - Impending (2-3 Years) Lay-in Acoustical Tile is in poor condition.

Remove existing lay-in
Acoustical Tiles and
replace with new lay-in
Acoustical Tiles.
$180 $220
897 McClellan Ranch Preserve
Nature Museum
D3030 - Cooling Systems 3 - Impending (2-3 Years) Split system (4-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$29,380 $34,670
901 McClellan Ranch Preserve
Nature Museum
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years)
The 100A (120/240V, 1P) all-
in-one combination service
entrance device is
approaching the end of its
expected useful life.

Replace the existing all-in-
one combination service
entrance device with a new
all-in-one combination
service entrance device.
$7,890 $9,320

Page 30 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
426
CC 03-03-2026 Searchable Packet
426 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1145 McClellan Ranch Preserve
Nature Museum
D5040 - Lighting 3 - Impending (2-3 Years) The exterior wall mounted fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$2,190 $2,590
1144 McClellan Ranch Preserve
Nature Museum
D5040 - Lighting 3 - Impending (2-3 Years) The light fixtures utilize inefficient incandescent
lamps.

Replace existing
incandescent fixtures with
LED fixtures.
$4,610 $5,440
1101 McClellan Ranch Preserve
Nature Museum
B2020 - Exterior Windows 4 - Necessary - Long Term
(3-4 Years)
Vinyl window sash is at or
approaching end of
expected useful service life.

Replace with new frame,
insulated glazing and
glazing compound.
$46,220 $56,860
1106 McClellan Ranch Preserve
Ranch House/Gift Shop
B2020 - Exterior Windows 3 - Impending (2-3 Years) Wood window is damaged.

Replace wood window. $12,320 $14,540
1104 McClellan Ranch Preserve
Ranch House/Gift Shop
C1010 - Interior Partitions 3 - Impending (2-3 Years) Lath and plaster interior wall skin is approaching
the end of its useful life.

Remove and replace
existing lath and plaster
with new lath and plaster.
$12,950 $15,290
1105 McClellan Ranch Preserve
Ranch House/Gift Shop
C1010 - Interior Partitions 3 - Impending (2-3 Years) Lath and plaster interior wall skin is approaching
the end of its useful life.

Remove and replace
existing lath and plaster
with new lath and plaster.
$25,880 $30,540
1107 McClellan Ranch Preserve
Ranch House/Gift Shop
C2030 - Flooring 3 - Impending (2-3 Years) Rolled carpeting is approaching the end of its
useful life.

Remove existing rolled
carpeting and replace it
with new 40 oz. nylon
carpet.
$49,270 $58,140
798 McClellan Ranch Preserve
Ranch House/Gift Shop
C2030 - Flooring 3 - Impending (2-3 Years) Sheet vinyl is approaching the end of its useful life.

Remove the existing sheet
vinyl and replace.
$11,690 $13,800
1103 McClellan Ranch Preserve
Ranch House/Gift Shop
C2030 - Flooring 3 - Impending (2-3 Years) Vinyl composition tile is approaching the end of its
useful life.

Remove the existing vinyl
composition tile and
replace.
$18,480 $21,810

Page 31 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
427
CC 03-03-2026 Searchable Packet
427 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
903 McClellan Ranch Preserve
Ranch House/Gift Shop
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
1146 McClellan Ranch Preserve
Ranch House/Gift Shop
D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$68,400 $80,720
1147 McClellan Ranch Preserve
Ranch House/Gift Shop
D5040 - Lighting 3 - Impending (2-3 Years)
The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$8,730 $10,310
910 McClellan Ranch Preserve
Ranch House/Gift Shop
D3020 - Heating Systems 4 - Necessary - Long Term
(3-4 Years)
Gas-fired furnace less than
250 Mbh is approaching
the end of its expected
useful life.

Provide equipment
replacement and
installation.
$16,350 $20,120
909 McClellan Ranch Preserve
Ranch House/Gift Shop
D2010 - Domestic Water
Distribution
5 - Potential - Long Term (4-
5 Years)
Gas fired water heater less
than 75 Gal is approaching
the end of its expected
useful life.

Provide equipment
replacement and
installation.
$12,700 $16,260
McClellan Ranch Preserve Nature Museum and Ranch House/Gift Shop $431,280 $515,660 1068 Memorial Park Gazebo B1080 - Stairs 3 - Impending (2-3 Years) Wood steps need refurbishing.

Refinish/refurb wood
steps.
$12,320 $14,540
1070 Memorial Park Gazebo G2060 - Site Development 3 - Impending (2-3 Years) Bench finish is at or approaching the end of its
useful life.

Repaint and refinish
bench.
$1,200 $1,420
Memorial Park Gazebo $13,520 $15,960

Page 32 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
428
CC 03-03-2026 Searchable Packet
428 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
686 Memorial Park Restroom 1 B3020 - Roof
Appurtenances
3 - Impending (2-3 Years) Gutters are clogged with
leaves.

Clean gutters. $630 $750
684 Memorial Park Restroom 1 C2030 - Flooring 3 - Impending (2-3 Years) Epoxy is approaching the end of its useful life.

Remove the existing epoxy
and replace.
$16,190 $19,110
685 Memorial Park Restroom 1 D2010 - Domestic Water
Distribution
3 - Impending (2-3 Years) Porcelain sink is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$7,710 $9,100
540 Memorial Park Restroom 1 D5040 - Lighting 3 - Impending (2-3 Years) The exterior wall mounted fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$8,730 $10,310
1148 Memorial Park Restroom 1 D5040 - Lighting 3 - Impending (2-3 Years) The light fixtures utilize inefficient incandescent
lamps.

Replace existing
incandescent fixtures with
LED fixtures.
$2,320 $2,740
691 Memorial Park Restroom 2 B2050 - Exterior Doors and Grilles
3 - Impending (2-3 Years) Existing gate is at or
approaching the end of its
useful life.

Install a new gate and
associated gate hardware.
$9,270 $10,940
689 Memorial Park Restroom 2 B2050 - Exterior Doors and Grilles
3 - Impending (2-3 Years) Exterior doors, frames and
hardware are approaching
the end of their useful life.

Replace the exterior doors,
frames and hardware.
$10,790 $12,740
1071 Memorial Park Restroom 2 C1090 - Interior Specialties 3 - Impending (2-3 Years) Toilet partitions have excessive amounts of rust.

Replace the toilet partitions $11,110 $13,110
690 Memorial Park Restroom 2 C2010 - Wall Finishes 3 - Impending (2-3 Years) Interior wall paint is in need of refresh.

Paint interior walls with 2
coat finish (includes
surface prep and primer).
$4,660 $5,500
561 Memorial Park Restroom 2 D5020 - Electrical Service and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550

Page 33 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
429
CC 03-03-2026 Searchable Packet
429 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
559 Memorial Park Restroom 2 D5020 - Electrical Service and Distribution
3 - Impending (2-3 Years) The 100A (30 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$11,000 $12,980
558 Memorial Park Restroom 2 D5020 - Electrical Service and Distribution
3 - Impending (2-3 Years) The 100A (30 ckts, 277/480,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,020 $20,090
557 Memorial Park Restroom 2 D5020 - Electrical Service and Distribution
3 - Impending (2-3 Years) The 45kVA transformer
(3P dry-type, 480-
120/208V) is approaching
the end of its expected
useful life.

Replace the existing
transformer with a new
transformer.
$12,500 $14,760
1149 Memorial Park Restroom 2 D5040 - Lighting 3 - Impending (2-3 Years) The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$4,370 $5,160
562 Memorial Park Restroom 2 D5040 - Lighting 3 - Impending (2-3 Years) The light fixtures utilize inefficient incandescent
lamps.

Replace existing
incandescent fixtures with
LED fixtures.
$4,610 $5,440
1074 Memorial Park Shed by
Field
B2010 - Exterior Walls 3 - Impending (2-3 Years) Trim is worn and should be replaced.

Replace trim and finish to
match. Replace at the
same time as siding.
$1,980 $2,340
1075 Memorial Park Shed by
Field
B2010 - Exterior Walls 3 - Impending (2-3 Years) Wood board siding is approaching the end of its
useful life.

Replace or repair the
existing wood siding.

Place a new siding over
building paper and
plywood sheathing.
$10,610 $12,520
1076 Memorial Park Shed by
Field
B2010 - Exterior Walls 3 - Impending (2-3 Years) Wood wall framing is approaching the end of its
useful life.

Remove and replace the
wood frame exterior and
interior walls.
$8,550 $10,090
1077 Memorial Park Shed by
Restroom
B2010 - Exterior Walls 3 - Impending (2-3 Years) Trim is worn and should be replaced.

Replace trim and finish to
match. Replace at the
same time as siding.
$3,890 $4,600

Page 34 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
430
CC 03-03-2026 Searchable Packet
430 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1078 Memorial Park Shed by
Restroom
B2010 - Exterior Walls 3 - Impending (2-3 Years) Wood board siding is approaching the end of its
useful life.

Replace or repair the
existing wood siding.

Place a new siding over
building paper and
plywood sheathing.
$17,760 $20,960
692 Memorial Park Shed by
Restroom
B3010 - Roofing 3 - Impending (2-3 Years) Asphalt composition roof is in fair to poor condition
with evidence of ponding,
blisters & leaks.

Remove and replace
asphalt composition
shingle roofing.
$12,950 $15,290
694 Memorial Park Shed by
Restroom
C2030 - Flooring 3 - Impending (2-3 Years) Sealed concrete floor is approaching the end of its
useful life.

Repair and refinish the
concrete floor.
$4,320 $5,100
564 Memorial Park Shed by
Restroom
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
1151 Memorial Park Shed by
Restroom
D5040 - Lighting 3 - Impending (2-3 Years)
The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$2,190 $2,590
1150 Memorial Park Shed by
Restroom
D5040 - Lighting 3 - Impending (2-3 Years) The light fixtures utilize inefficient incandescent
lamps.

Replace existing
incandescent fixtures with
LED fixtures.
$2,320 $2,740
Memorial Park Restrooms (2) and Sheds (2) $194,880 $230,060

Page 35 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
431
CC 03-03-2026 Searchable Packet
431 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1082 Monta Vista - Gymnastics
Building
B3010 - Roofing 1 - Immediate (0-1 Years) Built-up roofing is beyond its expected useful service
life and needs replacement.

Remove and replace built-
up roofing.
$23,110 $24,960
661 Monta Vista - Gymnastics
Building
D7050 - Detection and
Alarm
1 - Immediate (0-1 Years) The existing fire alarm
system is approaching the
end of its useful life and
should be replaced.

Replace the existing fire
alarm system with a
complete, site-wide, fully
addressable fire alarm
system.
$173,440 $187,320
1083 Monta Vista - Gymnastics
Building
B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Exterior doors are not
properly weather-stripped.

Weather-strip the openings
properly.
$9,270 $10,940
1080 Monta Vista - Gymnastics
Building
B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Metal door is damaged or
deteriorated.

Repair door and repaint. $44,350 $52,340
1081 Monta Vista - Gymnastics
Building
B3010 - Roofing 3 - Impending (2-3 Years) Built-up roofing is beyond its expected useful service
life and needs replacement.

Remove and replace built-
up roofing.
$531,200 $626,820
763 Monta Vista - Gymnastics
Building
B3080 - Overhead Exterior
Enclosures
3 - Impending (2-3 Years) Stucco soffits is damaged. Repair stucco soffit. $160 $190 751 Monta Vista - Gymnastics
Building
C2030 - Flooring 3 - Impending (2-3 Years) Epoxy is approaching the end of its useful life.

Remove the existing epoxy
and replace.
$13,870 $16,370
746 Monta Vista - Gymnastics
Building
C2030 - Flooring 3 - Impending (2-3 Years) Rolled carpeting is approaching the end of its
useful life.

Remove existing rolled
carpeting and replace it
with new 40 oz. nylon
carpet.
$9,870 $11,650
748 Monta Vista - Gymnastics
Building
C2030 - Flooring 3 - Impending (2-3 Years) Vinyl composition tile is approaching the end of its
useful life.

Remove the existing vinyl
composition tile and
replace.
$27,740 $32,740
753 Monta Vista - Gymnastics
Building
C2030 - Flooring 3 - Impending (2-3 Years) Vinyl composition tile is approaching the end of its
useful life.

Remove the existing vinyl
composition tile and
replace.
$23,110 $27,270

Page 36 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
432
CC 03-03-2026 Searchable Packet
432 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1079 Monta Vista - Gymnastics
Building
C2050 - Ceiling Finishes 3 - Impending (2-3 Years) Painted gypsum wallboard ceiling is approaching the
end of its useful life.

Remove the existing
gypsum board ceiling and
replace. Tape and paint.
$6,300 $7,440
648 Monta Vista - Gymnastics
Building
D3030 - Cooling Systems 3 - Impending (2-3 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $54,540
649 Monta Vista - Gymnastics
Building
D3030 - Cooling Systems 3 - Impending (2-3 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $54,540
650 Monta Vista - Gymnastics
Building
D3030 - Cooling Systems 3 - Impending (2-3 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $54,540
654 Monta Vista - Gymnastics
Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (30 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$11,000 $12,980
672 Monta Vista - Gymnastics
Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (30 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$11,000 $12,980
676 Monta Vista - Gymnastics
Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (30 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$11,000 $12,980

Page 37 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
433
CC 03-03-2026 Searchable Packet
433 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
655 Monta Vista - Gymnastics
Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 400A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$22,320 $26,340
657 Monta Vista - Gymnastics
Building
D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$515,200 $607,940
Monta Vista - Gymnastics Building $1,571,600 $1,834,880 1087 Monta Vista - Pre-School
Building
B3010 - Roofing 1 - Immediate (0-1 Years) Built-up roofing is beyond its expected useful service
life and needs replacement.

Remove and replace built-
up roofing.
$124,730 $134,710
681 Monta Vista - Pre-School
Building
D7050 - Detection and
Alarm
1 - Immediate (0-1 Years) The building is not
equipped with a fire alarm
system or the existing fire
alarm system is at the end
of its industry rated useful
life.

Provide a fully addressable
fire alarm control panel
with associated initiating
and signaling devices.
$60,090 $64,900
670 Monta Vista - Pre-School
Building
D3030 - Cooling Systems 2 - Crucial (1-2 Years) Split system (7.5-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$32,660 $36,910
671 Monta Vista - Pre-School
Building
D3030 - Cooling Systems 2 - Crucial (1-2 Years) Split system (7.5-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$32,660 $36,910
762 Monta Vista - Pre-School
Building
B2010 - Exterior Walls 3 - Impending (2-3 Years) Exterior cement plaster walls are damaged and
spalling in several areas.

Clean, patch, and repair
the cement plaster wall
finish.
$1,060 $1,260

Page 38 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
434
CC 03-03-2026 Searchable Packet
434 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1085 Monta Vista - Pre-School
Building
B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Metal door is damaged or
deteriorated.

Repair door and repaint. $14,790 $17,460
1086 Monta Vista - Pre-School
Building
C2030 - Flooring 3 - Impending (2-3 Years) Vinyl composition tile is approaching the end of its
useful life.

Remove the existing vinyl
composition tile and
replace.
$62,380 $73,610
1084 Monta Vista - Pre-School
Building
C2050 - Ceiling Finishes 3 - Impending (2-3 Years) Lay-in Acoustical Tile is in poor condition.

Remove existing lay-in
Acoustical Tiles and
replace with new lay-in
Acoustical Tiles.
$38,890 $45,900
678 Monta Vista - Pre-School
Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 800A metered main
switchboard (3P, 120/208 )
is approaching the end of
its expected useful life.

Replace the existing
metered main switchboard
with a new metered main
switchboard.
$20,460 $24,150
1135 Monta Vista - Pre-School
Building
D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$143,270 $169,060
Monta Vista - Pre-School Building $530,990 $604,870
45 Portal Park Recreation
Building
C1030 - Interior Doors 1 - Immediate (0-1 Years) Interior wood door is at or approaching the end of its
useful life.

Replace with new wood
door.
$6,790 $7,340
52 Portal Park Recreation
Building
B2010 - Exterior Walls 3 - Impending (2-3 Years) Painted stucco wall is showing signs of age and
wear.

Power wash and repaint
existing stucco walls.
$1,170 $1,390
51 Portal Park Recreation
Building
B3020 - Roof
Appurtenances
3 - Impending (2-3 Years) Rain leaders/gutters are
damaged and leak.

Repair, replace rain
leaders/gutters.
$5,560 $6,570
47 Portal Park Recreation
Building
C1010 - Interior Partitions 3 - Impending (2-3 Years) Painted gypsum wallboard is in poor condition with
several cracks.

Remove and replace
existing gypsum board
with a new gypsum board
and expansion joints. Tape
and paint.
$1,310 $1,550

Page 39 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
435
CC 03-03-2026 Searchable Packet
435 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
312 Portal Park Recreation
Building
C2030 - Flooring 3 - Impending (2-3 Years) Vinyl composition tile is approaching the end of its
useful life.

Remove the existing vinyl
composition tile and
replace.
$41,590 $49,080
120 Portal Park Recreation
Building
D2010 - Domestic Water
Distribution
3 - Impending (2-3 Years) Small under-counter
electric water heater less
than 10 Gal is approaching
the end of its expected
useful life.

Provide equipment
replacement and
installation.
$3,040 $3,590
118 Portal Park Recreation
Building
D3030 - Cooling Systems 3 - Impending (2-3 Years) Split system (3-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$26,120 $30,830
116 Portal Park Recreation
Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
1152 Portal Park Recreation
Building
D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$85,490 $100,880
112 Portal Park Recreation
Building
D5040 - Lighting 3 - Impending (2-3 Years)
The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$2,190 $2,590

Page 40 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
436
CC 03-03-2026 Searchable Packet
436 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
40 Portal Park Restrooms C2010 - Wall Finishes 3 - Impending (2-3 Years) Interior wall paint is in need of refresh.

Paint interior walls with 2
coat finish (includes
surface prep and primer).
$1,760 $2,080
307 Portal Park Restrooms C2030 - Flooring 3 - Impending (2-3 Years) Epoxy is approaching the end of its useful life.

Remove the existing epoxy
and replace.
$13,870 $16,370
122 Portal Park Restrooms D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
Portal Park Recreation Building & Restrooms $198,290 $233,370 503 Quinlan Community
Center
D3030 - Cooling Systems 1 - Immediate (0-1 Years) Air cooled chiller (120-ton) is approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
$67,750 $73,180
339 Quinlan Community
Center
D3020 - Heating Systems 2 - Crucial (1-2 Years) Medium boiler is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$80,070 $90,480
360 Quinlan Community
Center
D3030 - Cooling Systems 2 - Crucial (1-2 Years) Fan coil unit (10-ton) is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$16,030 $18,120
374 Quinlan Community
Center
D3030 - Cooling Systems 2 - Crucial (1-2 Years) Split ductless AC unit is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$23,110 $26,120
363 Quinlan Community
Center
D3050 - Facility HVAC
Distribution Systems
2 - Crucial (1-2 Years) Air handler / make up air
unit (17.5-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$69,300 $78,310
365 Quinlan Community
Center
D3050 - Facility HVAC
Distribution Systems
2 - Crucial (1-2 Years) Air handler / make up air
unit (17.5-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$69,300 $78,310

Page 41 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
437
CC 03-03-2026 Searchable Packet
437 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
366 Quinlan Community
Center
D3050 - Facility HVAC
Distribution Systems
2 - Crucial (1-2 Years) Air handler / make up air
unit (17.5-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$69,300 $78,310
377 Quinlan Community
Center
D3050 - Facility HVAC
Distribution Systems
2 - Crucial (1-2 Years) Air handler / make up air
unit (17.5-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$69,300 $78,310
390 Quinlan Community
Center
D3050 - Facility HVAC
Distribution Systems
2 - Crucial (1-2 Years) Air handler / make up air
unit (17.5-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$69,300 $78,310
502 Quinlan Community
Center
D3050 - Facility HVAC
Distribution Systems
2 - Crucial (1-2 Years) Air handler / make up air
unit (17.5-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$69,300 $78,310
522 Quinlan Community
Center
D3050 - Facility HVAC
Distribution Systems
2 - Crucial (1-2 Years) Air handler / make up air
unit (17.5-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$69,300 $78,310
389 Quinlan Community
Center
D3060 - Ventilation 2 - Crucial (1-2 Years) In-Line building exhaust fan is approaching the end
of its expected useful life.

Provide equipment
replacement and
installation.
$28,800 $32,550
378 Quinlan Community
Center
D3060 - Ventilation 2 - Crucial (1-2 Years) Roof exhaust fan is approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,790 $7,680
500 Quinlan Community
Center
B2010 - Exterior Walls 3 - Impending (2-3 Years) The top of the parapet wall is not protected.

Provide a sheet metal cap. $9,870 $11,650
518 Quinlan Community
Center
B2020 - Exterior Windows 3 - Impending (2-3 Years) Aluminum window is approaching/past it's
expected useful life.

Replace aluminum
window.
$1,108,570 $1,308,120
499 Quinlan Community
Center
C1030 - Interior Doors 3 - Impending (2-3 Years) Door frames are approaching the end of
their useful life.

Replace the door frames
with a pressed metal
frame.
$9,870 $11,650

Page 42 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
438
CC 03-03-2026 Searchable Packet
438 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
497 Quinlan Community
Center
C1030 - Interior Doors 3 - Impending (2-3 Years) Interior hollow metal door is in visual need of
refurbishment.

Refurbish/repair interior
hollow metal door.
$62,830 $74,140
510 Quinlan Community
Center
C2030 - Flooring 3 - Impending (2-3 Years) Rolled carpeting is approaching the end of its
useful life.

Remove existing rolled
carpeting and replace it
with new 40 oz. nylon
carpet.
$29,580 $34,910
520 Quinlan Community
Center
C2030 - Flooring 3 - Impending (2-3 Years) Wood flooring shows signs of wear.

Sand, repair and refinish
the wood flooring.
$34,040 $40,170
498 Quinlan Community
Center
C2030 - Flooring 3 - Impending (2-3 Years) Wood wall base is approaching the end of its
useful life.

Replace the wood wall
base.
$6,120 $7,230
495 Quinlan Community
Center
C2050 - Ceiling Finishes 3 - Impending (2-3 Years) Glue-On Acoustical Ceiling Tile is in poor
condition.

Remove existing Glue-On
Acoustical and replace
with new Glue-On
Acoustical Tiles.
$104,700 $123,550
341 Quinlan Community
Center
D2010 - Domestic Water
Distribution
3 - Impending (2-3 Years) Gas fired water heater less
than 75 Gal is approaching
the end of its expected
useful life.

Provide equipment
replacement and
installation.
$12,700 $14,990
338 Quinlan Community
Center
D2060 - Process Support
Plumbing Systems
3 - Impending (2-3 Years) Air compressor is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $18,200
384 Quinlan Community
Center
D3030 - Cooling Systems 3 - Impending (2-3 Years) Split system (2-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$22,860 $26,980
351 Quinlan Community
Center
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020

Page 43 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
439
CC 03-03-2026 Searchable Packet
439 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
353 Quinlan Community
Center
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
392 Quinlan Community
Center
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
393 Quinlan Community
Center
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
394 Quinlan Community
Center
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 277/480,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$25,160 $29,690
367 Quinlan Community
Center
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 30kVA transformer
(3P dry-type, 480-
120/208V) is approaching
the end of its expected
useful life.

Replace the existing
transformer with a new
transformer.
$10,730 $12,670
354 Quinlan Community
Center
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 75kVA transformer
(3P dry-type, 480-
120/208V) is approaching
the end of its expected
useful life.

Replace the existing
transformer with a new
transformer.
$15,870 $18,730
395 Quinlan Community
Center
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 75kVA transformer
(3P dry-type, 480-
120/208V) is approaching
the end of its expected
useful life.

Replace the existing
transformer with a new
transformer.
$15,870 $18,730

Page 44 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
440
CC 03-03-2026 Searchable Packet
440 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
355 Quinlan Community
Center
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 800A metered main
switchboard (3P, 277/480 )
is approaching the end of
its expected useful life.

Replace the existing
metered main switchboard
with a new metered main
switchboard.
$20,460 $24,150
359 Quinlan Community
Center
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The motor control center is
at or is approaching end of
its expected useful life.

Replace the existing motor
control center with a new
motor control center.
$59,140 $69,790
375 Quinlan Community
Center
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The motor control center is
at or is approaching end of
its expected useful life.

Replace the existing motor
control center with a new
motor control center.
$59,140 $69,790
1129 Quinlan Community
Center
D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$1,575,060 $1,858,580
1130 Quinlan Community
Center
D5040 - Lighting 3 - Impending (2-3 Years)
The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$82,770 $97,670
512 Quinlan Community
Center
E2010 - Fixed Furnishings 3 - Impending (2-3 Years) Mirror is damaged. Remove and replace mirror.
$6,480 $7,650
489 Quinlan Community
Center
B2050 - Exterior Doors and
Grilles
4 - Necessary - Long Term
(3-4 Years)
Exterior aluminum
(storefront) entrance door
is approaching the end of
its useful life.

Replace aluminum door
(storefront).
$291,010 $357,950
380 Quinlan Community
Center
D3060 - Ventilation 4 - Necessary - Long Term
(3-4 Years)
In-Line building exhaust
fan is approaching the end
of its expected useful life.

Provide equipment
replacement and
installation.
$28,800 $35,430
346 Quinlan Community
Center
D3060 - Ventilation 4 - Necessary - Long Term
(3-4 Years)
Utility exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $18,970

Page 45 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
441
CC 03-03-2026 Searchable Packet
441 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
347 Quinlan Community
Center
D3060 - Ventilation 4 - Necessary - Long Term
(3-4 Years)
Utility exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $18,970
362 Quinlan Community
Center
D3060 - Ventilation 4 - Necessary - Long Term
(3-4 Years)
Utility exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $18,970
381 Quinlan Community
Center
D3060 - Ventilation 4 - Necessary - Long Term
(3-4 Years)
Utility exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $18,970
370 Quinlan Community
Center
D3030 - Cooling Systems 5 - Potential - Long Term (4-
5 Years)
Window mounted AC unit
is approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,890
343 Quinlan Community
Center
D5020 - Electrical Service
and Distribution
5 - Potential - Long Term (4-
5 Years)
The 7.5kVA transformer
(1P dry-type, 240/480-
120/240V) is approaching
the end of its expected
useful life.

Replace the existing
transformer with a new
transformer.
$6,660 $8,530
Quinlan Community Center $4,460,440 $5,245,100
1158 Senior Center D7050 - Detection and
Alarm
1 - Immediate (0-1 Years) The existing fire alarm
system is approaching the
end of its useful life and
should be replaced.

Replace the existing fire
alarm system with a
complete, site-wide, fully
addressable fire alarm
system.
$286,410 $309,330
442 Senior Center D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (15-
ton to 25-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$123,180 $139,200
446 Senior Center D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $52,230

Page 46 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
442
CC 03-03-2026 Searchable Packet
442 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
448 Senior Center D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $52,230
450 Senior Center D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (8-
ton to 15-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$77,010 $87,030
452 Senior Center D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (8-
ton to 15-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$77,010 $87,030
454 Senior Center D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (8-
ton to 15-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$77,010 $87,030
445 Senior Center D3050 - Facility HVAC
Distribution Systems
2 - Crucial (1-2 Years) Air handler / make up air
unit (17.5-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$69,300 $78,310
464 Senior Center D3030 - Cooling Systems 3 - Impending (2-3 Years) Split system (3-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$26,120 $30,830
457 Senior Center D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 1000A metered main
switchboard (3P, 120/208 )
is approaching the end of
its expected useful life.

Replace the existing
metered main switchboard
with a new metered main
switchboard.
$31,720 $37,430

Page 47 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
443
CC 03-03-2026 Searchable Packet
443 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
461 Senior Center D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
462 Senior Center D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
476 Senior Center D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
477 Senior Center D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
1131 Senior Center D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$850,800 $1,003,950
1132 Senior Center D5040 - Lighting 3 - Impending (2-3 Years) The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$43,570 $51,420
443 Senior Center D3060 - Ventilation 4 - Necessary - Long Term (3-4 Years)
Roof exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,790 $8,360
447 Senior Center D3060 - Ventilation 4 - Necessary - Long Term (3-4 Years)
Roof exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,790 $8,360
449 Senior Center D3060 - Ventilation 4 - Necessary - Long Term (3-4 Years)
Roof exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,790 $8,360

Page 48 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
444
CC 03-03-2026 Searchable Packet
444 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
451 Senior Center D3060 - Ventilation 4 - Necessary - Long Term (3-4 Years)
Roof exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,790 $8,360
453 Senior Center D3060 - Ventilation 4 - Necessary - Long Term (3-4 Years)
Roof exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,790 $8,360
455 Senior Center D3060 - Ventilation 4 - Necessary - Long Term (3-4 Years)
Roof exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,790 $8,360
444 Senior Center D3060 - Ventilation 4 - Necessary - Long Term (3-4 Years)
Utility exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $18,970
Senior Center $1,881,970 $2,169,230
699 Service Center
Administration Building
B3060 - Horizontal
Openings
1 - Immediate (0-1 Years) Roof hatch lacks safety
post.

Provide safety post. $1,240 $1,340
587 Service Center
Administration Building
D7050 - Detection and
Alarm
1 - Immediate (0-1 Years) The existing fire alarm
system is approaching the
end of its useful life and
should be replaced.

Replace the existing fire
alarm system with a
complete, site-wide, fully
addressable fire alarm
system.
$131,200 $141,700
570 Service Center
Administration Building
D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (1-
ton to 3-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$15,420 $17,430
566 Service Center
Administration Building
D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $52,230

Page 49 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
445
CC 03-03-2026 Searchable Packet
445 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
569 Service Center
Administration Building
D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $52,230
701 Service Center
Administration Building
A4010 - Standard Slabs on
Grade
3 - Impending (2-3 Years) Excessive cracks were
detected in the floor slab-
on-grade.

Fill the slab-on-grade
cracks with caulking.
$660 $780
698 Service Center
Administration Building
B2010 - Exterior Walls 3 - Impending (2-3 Years) The top of the parapet wall is not protected.

Provide a sheet metal cap. $30,800 $36,350
712 Service Center
Administration Building
B2020 - Exterior Windows 3 - Impending (2-3 Years) Metal window is approaching the end of its
useful life.

Replace metal window. $73,910 $87,220
697 Service Center
Administration Building
B3010 - Roofing 3 - Impending (2-3 Years) Built-up roofing is beyond its expected useful service
life and needs replacement.

Remove and replace built-
up roofing.
$304,880 $359,760
1117 Service Center
Administration Building
C1030 - Interior Doors 3 - Impending (2-3 Years) Interior wood door is in visual need of
refurbishment.

Refurbish and restain the
wood door.
$12,950 $15,290
707 Service Center
Administration Building
C2010 - Wall Finishes 3 - Impending (2-3 Years) Interior wall paint is in need of refresh.

Paint interior walls with 2
coat finish (includes
surface prep and primer).
$23,180 $27,360
706 Service Center
Administration Building
C2030 - Flooring 3 - Impending (2-3 Years) Grout is damaged and deteriorating on the tiled
floor.

Clean and regrout tiles. $3,710 $4,380
703 Service Center
Administration Building
C2030 - Flooring 3 - Impending (2-3 Years) Rolled carpeting is approaching the end of its
useful life.

Remove existing rolled
carpeting and replace it
with new 40 oz. nylon
carpet.
$9,870 $11,650
1118 Service Center
Administration Building
C2030 - Flooring 3 - Impending (2-3 Years) Sheet vinyl is approaching the end of its useful life.

Remove the existing sheet
vinyl and replace.
$33,140 $39,110

Page 50 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
446
CC 03-03-2026 Searchable Packet
446 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
700 Service Center
Administration Building
C2030 - Flooring 3 - Impending (2-3 Years) Vinyl composition tile is approaching the end of its
useful life.

Remove the existing vinyl
composition tile and
replace.
$16,190 $19,110
702 Service Center
Administration Building
C2030 - Flooring 3 - Impending (2-3 Years) Vinyl composition tile is approaching the end of its
useful life.

Remove the existing vinyl
composition tile and
replace.
$3,490 $4,120
708 Service Center
Administration Building
C2030 - Flooring 3 - Impending (2-3 Years) Vinyl composition tile is approaching the end of its
useful life.

Remove the existing vinyl
composition tile and
replace.
$11,560 $13,650
710 Service Center
Administration Building
C2050 - Ceiling Finishes 3 - Impending (2-3 Years) Lay-in Acoustical Tile is in poor condition.

Remove existing lay-in
Acoustical Tiles and
replace with new lay-in
Acoustical Tiles.
$57,590 $67,960
588 Service Center
Administration Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
585 Service Center
Administration Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (30 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$11,000 $12,980
583 Service Center
Administration Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 225A (42 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$17,810 $21,020
586 Service Center
Administration Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 400A metered main
switchboard (3P, 120/208 )
is approaching the end of
its expected useful life.

Replace the existing
metered main switchboard
with a new metered main
switchboard.
$17,020 $20,090

Page 51 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
447
CC 03-03-2026 Searchable Packet
447 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
575 Service Center
Administration Building
D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$389,730 $459,890
1136 Service Center
Administration Building
D5040 - Lighting 3 - Impending (2-3 Years)
The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$32,690 $38,580
711 Service Center
Administration Building
B2050 - Exterior Doors and
Grilles
4 - Necessary - Long Term
(3-4 Years)
Exterior aluminum
entrance door, frame and
hardware is approaching
the end of its useful life.

Replace aluminum door,
frame, and hardware.
$27,000 $33,220
568 Service Center
Administration Building
D3030 - Cooling Systems 4 - Necessary - Long Term
(3-4 Years)
Split system (1-ton) with
wall mounted AC and
outdoor condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$16,350 $20,120
571 Service Center
Administration Building
D3060 - Ventilation 4 - Necessary - Long Term
(3-4 Years)
Roof/sidewall ventilator is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,580
572 Service Center
Administration Building
D3060 - Ventilation 4 - Necessary - Long Term
(3-4 Years)
Roof/sidewall ventilator is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,580
590 Service Center
Administration Building
D3030 - Cooling Systems 5 - Potential - Long Term (4-
5 Years)
Window mounted AC unit
is approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,890
1116 Service Center Shops &
Mechanic Building
B2010 - Exterior Walls 3 - Impending (2-3 Years) Metal siding panels damaged in several
locations.

Replace damaged panels. $4,950 $5,850
713 Service Center Shops &
Mechanic Building
B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) Exterior aluminum
entrance door, frame and
hardware is approaching
the end of its useful life.

Replace aluminum door,
frame, and hardware.
$6,770 $7,990

Page 52 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
448
CC 03-03-2026 Searchable Packet
448 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1115 Service Center Shops &
Mechanic Building
B2050 - Exterior Doors and
Grilles
3 - Impending (2-3 Years) The existing threshold is
approaching the end of its
useful life.

Replace the associated
threshold.
$480 $570
722 Service Center Shops &
Mechanic Building
C2030 - Flooring 3 - Impending (2-3 Years) Rolled carpeting is approaching the end of its
useful life.

Remove existing rolled
carpeting and replace it
with new 40 oz. nylon
carpet.
$9,870 $11,650
725 Service Center Shops &
Mechanic Building
C2030 - Flooring 3 - Impending (2-3 Years) Rolled carpeting is approaching the end of its
useful life.

Remove existing rolled
carpeting and replace it
with new 40 oz. nylon
carpet.
$29,580 $34,910
612 Service Center Shops &
Mechanic Building
D3030 - Cooling Systems 3 - Impending (2-3 Years) Window mounted AC unit is approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,270
617 Service Center Shops &
Mechanic Building
D3030 - Cooling Systems 3 - Impending (2-3 Years) Window mounted AC unit is approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,270
615 Service Center Shops &
Mechanic Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (120/208V) all-in-
one combination service
entrance pedestal is
approaching the end of its
expected useful life.

Replace the existing all-in-
one combination service
entrance device with a new
all-in-one combination
service entrance device.
$7,890 $9,320
609 Service Center Shops &
Mechanic Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
620 Service Center Shops &
Mechanic Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550

Page 53 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
449
CC 03-03-2026 Searchable Packet
449 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
621 Service Center Shops &
Mechanic Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
719 Service Center Shops &
Mechanic Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
724 Service Center Shops &
Mechanic Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
728 Service Center Shops &
Mechanic Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
715 Service Center Shops &
Mechanic Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (30 ckts, 120/208,
3P) panelboard is
approaching the end of its
expected useful life.

Replace the existing
panelboard with a new
panelboard.
$11,000 $12,980
625 Service Center Shops &
Mechanic Building
D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$452,850 $534,370
619 Service Center Shops &
Mechanic Building
D3030 - Cooling Systems 4 - Necessary - Long Term
(3-4 Years)
Window mounted AC unit
is approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,580

Page 54 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
450
CC 03-03-2026 Searchable Packet
450 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
622 Service Center Shops &
Mechanic Building
D3060 - Ventilation 4 - Necessary - Long Term
(3-4 Years)
Roof/sidewall ventilator is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,580
623 Service Center Shops &
Mechanic Building
D3060 - Ventilation 4 - Necessary - Long Term
(3-4 Years)
Roof/sidewall ventilator is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,580
614 Service Center Shops &
Mechanic Building
D3020 - Heating Systems 5 - Potential - Long Term (4-
5 Years)
Gas fired unit heater is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$11,420 $14,620
626 Service Center Shops &
Mechanic Building
D3020 - Heating Systems 5 - Potential - Long Term (4-
5 Years)
Gas fired unit heater is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$11,420 $14,620
606 Service Center Shops &
Mechanic Building
D3060 - Ventilation 5 - Potential - Long Term (4-
5 Years)
Roof exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,790 $8,700
607 Service Center Shops &
Mechanic Building
D3060 - Ventilation 5 - Potential - Long Term (4-
5 Years)
Roof exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,790 $8,700
731 Service Center Welding
Building
B2080 - Exterior Wall
Appurtenances
3 - Impending (2-3 Years) Awning (metal) is
approaching the end of its
useful life.

Replace metal awning. $21,580 $25,470
730 Service Center Welding
Building
C2010 - Wall Finishes 3 - Impending (2-3 Years) Interior wall paint is in need of refresh.

Paint interior walls with 2
coat finish (includes
surface prep and primer).
$5,800 $6,850
629 Service Center Welding
Building
D3030 - Cooling Systems 3 - Impending (2-3 Years) Window mounted AC unit is approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,270
628 Service Center Welding
Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550

Page 55 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
451
CC 03-03-2026 Searchable Packet
451 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
631 Service Center Welding
Building
D3030 - Cooling Systems 5 - Potential - Long Term (4-
5 Years)
Window mounted AC unit
is approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,890
729 Service Center Welding
Building
D3030 - Cooling Systems
5 - Potential - Long Term (4-
5 Years)
Window mounted AC unit
is approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
$6,160 $7,890
Service Center Welding Bldg., Shops & Mechanical Bldg, Administration Bldg. $2,026,380 $2,381,950 414 Sports Center D7050 - Detection and
Alarm
1 - Immediate (0-1 Years) The existing fire alarm
system is approaching the
end of its useful life and
should be replaced.

Replace the existing fire
alarm system with a
complete, site-wide, fully
addressable fire alarm
system.
$309,490 $334,250
423 Sports Center D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $52,230
430 Sports Center D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $52,230
431 Sports Center D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (3-
ton to 8-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$46,220 $52,230
422 Sports Center D3030 - Cooling Systems 2 - Crucial (1-2 Years) Rooftop/ground mounted packaged DX AC unit (8-
ton to 15-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$77,010 $87,030

Page 56 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
452
CC 03-03-2026 Searchable Packet
452 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
424 Sports Center D3050 - Facility HVAC
Distribution Systems
2 - Crucial (1-2 Years) Air handler / make up air
unit (17.5-ton) is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$69,300 $78,310
527 Sports Center B1080 - Stairs 3 - Impending (2-3 Years) Wood steps need refurbishing.

Refinish/refurb wood
steps.
$49,270 $58,140
526 Sports Center B2080 - Exterior Wall
Appurtenances
3 - Impending (2-3 Years) Awning (fabric) is
approaching the end of its
useful life.

Replace fabric awning. $1,560 $1,850
524 Sports Center B3010 - Roofing 3 - Impending (2-3 Years) Wood fascia and trim chipped and have peeling
paint.

Clean, repair, and paint the
trim and/or fascia.
$39,680 $46,830
1114 Sports Center C1030 - Interior Doors 3 - Impending (2-3 Years) Interior wood door is in visual need of
refurbishment.

Refurbish and restain the
wood door.
$3,710 $4,380
531 Sports Center C2030 - Flooring 3 - Impending (2-3 Years) Grout is damaged and deteriorating on the tiled
floor.

Clean and regrout tiles. $12,320 $14,540
538 Sports Center C2030 - Flooring 3 - Impending (2-3 Years) Gymnasium floor is approaching the end of its
useful life.

Replace the existing
flooring with a new wood
gym floor.
$197,080 $232,560
530 Sports Center C2030 - Flooring 3 - Impending (2-3 Years) Sheet vinyl is approaching the end of its useful life.

Remove the existing sheet
vinyl and replace.
$18,710 $22,080
528 Sports Center C2050 - Ceiling Finishes 3 - Impending (2-3 Years) Lay-in Acoustical Tile is in poor condition.

Remove existing lay-in
Acoustical Tiles and
replace with new lay-in
Acoustical Tiles.
$1,470 $1,740
534 Sports Center C2050 - Ceiling Finishes 3 - Impending (2-3 Years) Lay-in Acoustical Tile is in poor condition.

Remove existing lay-in
Acoustical Tiles and
replace with new lay-in
Acoustical Tiles.
$14,410 $17,010

Page 57 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
453
CC 03-03-2026 Searchable Packet
453 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
426 Sports Center D3030 - Cooling Systems 3 - Impending (2-3 Years) Split system (3-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$26,120 $30,830
427 Sports Center D3030 - Cooling Systems 3 - Impending (2-3 Years) Split system (3-ton) with fan coil and outdoor
condensing unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$26,120 $30,830
411 Sports Center D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
421 Sports Center D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
439 Sports Center D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
409 Sports Center D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 150kVA transformer
(3P dry-type, 480-
120/208V) is approaching
the end of its expected
useful life.

Replace the existing
transformer with a new
transformer.
$24,800 $29,270
413 Sports Center D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 400A switchboard is
approaching the end of its
expected useful life.

Replace the existing
switchboard with a new
switchboard.
$17,020 $20,090

Page 58 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
454
CC 03-03-2026 Searchable Packet
454 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
1134 Sports Center D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$919,400 $1,084,900
1133 Sports Center D5040 - Lighting 3 - Impending (2-3 Years) The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$13,090 $15,450
428 Sports Center D3060 - Ventilation 5 - Potential - Long Term (4- 5 Years)
Roof exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,790 $8,700
436 Sports Center D3060 - Ventilation 5 - Potential - Long Term (4- 5 Years)
Roof exhaust fan is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$6,790 $8,700
Sports Center $1,986,900 $2,300,830
769 Traffic Maintenance Yard -
Building 1
B2020 - Exterior Windows 3 - Impending (2-3 Years) Steel framed windows are at or approaching end of
expected useful service life.

Replace steel framed
windows.
$30,800 $36,350
768 Traffic Maintenance Yard -
Building 1
B3010 - Roofing 3 - Impending (2-3 Years) Metal Roofing is at or approaching end of
expected useful service life.

Remove and replace metal
roofing.
$42,510 $50,170
1112 Traffic Maintenance Yard -
Building 1
B3020 - Roof
Appurtenances
3 - Impending (2-3 Years) Rain leaders/gutters are
damaged and leak.

Repair, replace rain
leaders/gutters.
$4,640 $5,480
1109 Traffic Maintenance Yard -
Building 1
C2050 - Ceiling Finishes 3 - Impending (2-3 Years) Lay-in Acoustical Tile is in poor condition.

Remove existing lay-in
Acoustical Tiles and
replace with new lay-in
Acoustical Tiles.
$15,850 $18,710
1110 Traffic Maintenance Yard -
Building 1
C2030 - Flooring 4 - Necessary - Long Term
(3-4 Years)
Vinyl composition tile is
approaching the end of its
useful life.

Remove the existing vinyl
composition tile and
replace.
$18,480 $22,740

Page 59 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
455
CC 03-03-2026 Searchable Packet
455 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
833 Traffic Maintenance Yard -
Building 1
D3030 - Cooling Systems 4 - Necessary - Long Term
(3-4 Years)
Wall mounted AC unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$30,800 $37,890
834 Traffic Maintenance Yard -
Building 1
D3030 - Cooling Systems 4 - Necessary - Long Term
(3-4 Years)
Wall mounted AC unit is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$30,800 $37,890
1111 Traffic Maintenance Yard -
Building 1
C2030 - Flooring 5 - Potential - Long Term (4-
5 Years)
Rolled carpeting is
approaching the end of its
useful life.

Remove existing rolled
carpeting and replace it
with new 40 oz. nylon
carpet.
$6,160 $7,890
842 Traffic Maintenance Yard -
Building 2
D3030 - Cooling Systems 1 - Immediate (0-1 Years) Window mounted AC unit is approaching the end of
its expected useful life.

Provide equipment
replacement and
installation.
$6,160 $6,660
Traffic Maintenance Yard - Buildings 1 & 2 $186,200 $223,780 274 Wilson Park Recreation
Building
B2010 - Exterior Walls 3 - Impending (2-3 Years) Wood board siding is approaching the end of its
useful life.

Replace or repair the
existing wood siding.

Place a new siding over
building paper and
plywood sheathing.
$36,960 $43,620
278 Wilson Park Recreation
Building
B3010 - Roofing 3 - Impending (2-3 Years) Wood fascia and trim chipped and have peeling
paint.

Clean, repair, and paint the
trim and/or fascia.
$17,270 $20,380
273 Wilson Park Recreation
Building
C1030 - Interior Doors 3 - Impending (2-3 Years) Interior wood door is at or approaching the end of its
useful life.

Replace with new wood
door.
$6,790 $8,020
1113 Wilson Park Recreation
Building
C2030 - Flooring 3 - Impending (2-3 Years) 6" Vinyl wall base is approaching the end of its
useful life.

Replace the vinyl wall
base.
$390 $470
272 Wilson Park Recreation
Building
D2010 - Domestic Water
Distribution
3 - Impending (2-3 Years) Water leakage from
plumbing fixture.

Investigate cause of leak
and provide repairs and
adjustments as necessary.
$630 $750

Page 60 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
456
CC 03-03-2026 Searchable Packet
456 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
205 Wilson Park Recreation
Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (120/240V, 1P) all-
in-one combination service
entrance device is
approaching the end of its
expected useful life.

Replace the existing all-in-
one combination service
entrance device with a new
all-in-one combination
service entrance device.
$7,890 $9,320
202 Wilson Park Recreation
Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
271 Wilson Park Recreation
Building
D5020 - Electrical Service
and Distribution
3 - Impending (2-3 Years) The 100A (18 ckts, 20A
plug-in breakers, 1P) load
center is approaching the
end of its expected useful
life.

Replace the existing load
center with a new load
center.
$4,700 $5,550
1153 Wilson Park Recreation
Building
D5040 - Lighting 3 - Impending (2-3 Years) Interior lighting system is at or is approaching end of
its expected useful life.

Provide new interior
lighting and control system
throughout building per
current CEC T24 code.
$78,340 $92,450
215 Wilson Park Recreation
Building
D5040 - Lighting 3 - Impending (2-3 Years)
The exterior wall mounted
fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$2,190 $2,590
279 Wilson Park Recreation
Building
G2060 - Site Development 3 - Impending (2-3 Years) Bench finish is at or approaching the end of its
useful life.

Repaint and refinish
bench.
$610 $720
284 Wilson Park Restroom B2010 - Exterior Walls 3 - Impending (2-3 Years) Trim is worn and should be replaced.

Replace trim and finish to
match. Replace at the
same time as siding.
$6,160 $7,270
280 Wilson Park Restroom B3010 - Roofing 3 - Impending (2-3 Years) Wood fascia and trim chipped and have peeling
paint.

Clean, repair, and paint the
trim and/or fascia.
$6,910 $8,160

Page 61 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
457
CC 03-03-2026 Searchable Packet
457 of 495
Building Condition Assessment Report, February 2023
ID# Location Name Building System
Classification Priority Deficiency Description Description of Work Current Repair Cost
Escalated
Repair Costs
281 Wilson Park Restroom C1090 - Interior Specialties 3 - Impending (2-3 Years) Toilet partitions have excessive amounts of rust.

Replace the toilet partitions $11,110 $13,110
1154 Wilson Park Restroom D5040 - Lighting 3 - Impending (2-3 Years) The exterior wall mounted fixture is approaching the
end of its expected useful
life.

Replace the existing wall
mounted lighting fixture
with an LED lighting
fixture.
$2,190 $2,590
213 Wilson Park Restroom D5040 - Lighting 3 - Impending (2-3 Years) The light fixtures utilize inefficient incandescent
lamps.

Replace existing
incandescent fixtures with
LED fixtures.
$3,470 $4,100
285 Wilson Park Snack Shack B3020 - Roof
Appurtenances
3 - Impending (2-3 Years) Rain leaders/gutters are
damaged and leak.

Repair, replace rain
leaders/gutters.
$3,710 $4,380
289 Wilson Park Snack Shack C2030 - Flooring 3 - Impending (2-3 Years) Vinyl composition tile is approaching the end of its
useful life.

Remove the existing vinyl
composition tile and
replace.
$6,030 $7,120
291 Wilson Park Snack Shack D2010 - Domestic Water
Distribution
3 - Impending (2-3 Years) Porcelain sink is
approaching the end of its
expected useful life.

Provide equipment
replacement and
installation.
$7,710 $9,100
219 Wilson Park Snack Shack D5040 - Lighting 3 - Impending (2-3 Years) The light fixtures utilize inefficient incandescent
lamps.

Replace existing
incandescent fixtures with
LED fixtures.
$11,540 $13,620
Wilson Park Recreation Bldg, Restroom and Snack Shack $219,300 $258,870 Total $28,909,270 $33,797,360

Page 62 of 62 ends

DETAIL BY BUILDING
Highlighted Rows are likely to
require Engineering Services
458
CC 03-03-2026 Searchable Packet
458 of 495

9. From the 2022 Playground
Prioritizations

9. PLAYGROUNDS
FY 2023-24 CIP 5-Year Plan
459
CC 03-03-2026 Searchable Packet
459 of 495

PLAYGROUND PRIORITIZATION LIST
Playground Age Manufacturer Year Priority Equipment Observation Recommendation Photos Outreach ADA notes Canyon Oaks Preschool Gametime 1999 1 Slide
There is a gap between the slide bed and the platform that might catch clothing, especially strings or cords that children could have around their necks. Slides should not have any spaces or gaps between the platform, section seams, or the start of the slide chute.

The manufacturer should be contacted to determine what actions are appropriate to correct the gap.

Canyon Oaks Preschool Gametime 1999 3 Webs
There are spider webs in several areas of the composite structure. The spider webs should be removed. The undersides of all platforms should be inspected regularly to ensure hazards posed by insects are controlled.

Canyon Oaks Preschool Gametime 1999 3 Platform
The coating on several platforms is beginning to crack. This damage could compromise the integrity of the structure if the metal is exposed to the elements. The cracking could also present a trip hazard for children using the platform.

The manufacturer should be contacted to determine what corrective actions can be taken to repair the coating on the platform.

Canyon Oaks Preschool Gametime 1999 4 Play Surface
Play surfaces throughout the playground showed signs of vandalism. The play surfaces should be cleaned in accordance with the manufacturers’ instructions.

Creekside School Landscape Structures 1998 1 Slide
Gaps were observed between the section seams of the slide that might catch clothing, especially strings or cords that children could have around their necks. To avoid potential entanglement hazards, slides should not have any spaces or gaps between the platform, section seams, or at the start of the slide chute.

The manufacturer should be contacted to determine what steps should be taken to eliminate the entanglement hazard.

Creekside School Landscape Structures 1998 2
Loose Fill
Surfacing
Material
The loose fill surfacing material is not level with the top of the recommended surfacing mark.

This may indicate that the depth of the loose fill material is inadequate.

The City should ensure the loose fill surfacing material is maintained at the required depth and is evenly distributed throughout the playground equipment area.

Creekside School Landscape Structures 1998 2 Platform
There were bolts on the underside of some of the platforms that have two nuts on each bolt. Projections on playground equipment should not be able to entangle children’s clothing nor should they be large enough to cause an impalement hazard.

One nut should be removed, and the bolt should be trimmed so that no more than two threads protrude. Any sharp edges or burrs should be removed.

Creekside School Landscape Structures 1998 2 Bolts
Rusted bolts were noted on the structure. Rust is a sign of metal deterioration, which may eventually compromise the structural strength of the equipment.

Bolts and other hardware on all equipment should be checked on a regular basis and replaced in accordance with
the manufacturer’s requirements. The City should review its playground maintenance program to ensure high-frequency inspections are conducted and documented.

Creekside School Landscape Structures 1998 3 Paint
Some of the surfaces of the composite structure showed signs of worn, chipping, or peeling paint. This may result in a child accidentally ingesting paint, and if the painted surfaces contain lead, there is the possibility of lead poisoning. In addition, having exposed areas of bare metal may cause increased deterioration in the components as a result of exposure to weather conditions.

The manufacturer should be contacted to determine what steps should be taken to repaint surface.

Creekside School Landscape Structures 1998 4 Play Surface Play surfaces throughout the playground showed signs of vandalism. The play surfaces should be cleaned in accordance with the manufacturer’s instructions.
• 5 items related to path of travel
work including play equipment
area.
• Cost: $18,000
• Transition plan has listed only 9
items total for this playground.
• 3 items related to path of travel
work including play equipment
area.
• Cost: $25,000
No
Yes
PAGE 1 OF 2
Note: Playground Inspections were conducted by an outside consultant, and these prioritizations were developed by PW Staff. 460
CC 03-03-2026 Searchable Packet
460 of 495

PLAYGROUND PRIORITIZATION LIST
Oak Valley Preschool Gametime 1999 2 Bolts
There are missing bolts from portals. All fastening devices are required to provide structural strength.

The missing bolt should be replaced with manufacturer- approved hardware and in accordance with the manufacturer’s installation instructions.

Oak Valley Preschool Gametime 1999 2 Skylight
The surface of the skylight has a crack. Cracks will expand in time, which increases the risk of injury.

The skylight should be checked, and the manufacturer of the composite structure contacted regarding the repair or the replacement of the porthole.

Oak Valley Preschool Gametime 1999 3 Platform
The coating on several platforms is beginning to crack. This damage could compromise the integrity of the structure if the metal is exposed to the elements. The cracking could also present a trip hazard for children using the platform.

The manufacturer should be contacted to determine what corrective actions can be taken to repair the coating on the platform.

Varian Preschool Gametime 1998 2 Bolts
Rusted bolts were noted on the play structure. Rust is a sign of metal deterioration, which may eventually compromise the structural strength of the equipment.

Bolts and other hardware on all equipment should be checked on a regular basis and replaced in accordance with the manufacturer's requirements. The City should review its playground maintenance program to ensure high-frequency inspections are conducted and documented.

Varian Preschool Gametime 1998 3 Paint
Some of the surfaces of the composite structure showed signs of worn, chipping, or peeling paint. This may result in a child accidentally ingesting paint, and if the painted surfaces contain lead, there is the possibility of lead poisoning. In addition, having exposed areas of bare metal may cause increased deterioration in the components as a result of exposure to weather
conditions.

The manufacturer should be contacted to determine what steps should be taken to repaint surfaces.

Varian Preschool Gametime 1998 3 Slide
The surfaces of the slides appear to have cracks. Cracks on the slide bed will increase with time, which increases the risk of injury.

Contact the manufacturer of the composite structure for information on repairing the slide beds.
• 3 items on the path of travel.The
play equipment area was NOT
called out.
• Cost: $15,000
• Transition plan has listed only 5
items total for this playground.
• 6 items on the path of travel,
including play equipement area.
• Cost: $13,000
No
Yes
PAGE 2 OF 2
461
CC 03-03-2026 Searchable Packet
461 of 495

9. From the 2022 Playground
Prioritizations

9. PLAYGROUNDS
FY 2023-24 CIP 5-Year Plan

10. From the 2024 Storm Drain
Outfall
Assessment report
462
CC 03-03-2026 Searchable Packet
462 of 495

1000 Broadway 510.903.6600 Tel
Suite 320 510.903.6601 Fax
Oakland , CA 94607 vaengineering.com

Cupertino Storm Drain
Outfall Assessment
To: Jimmy Tan , PE (City of Cupertino)
From: Connor Thomas (V&A); Noy Phannavong, PE (V&A)
Date: August 20 , 2024
V&A #: 23-0026
Subject: Storm Drain Outfall Pipes and Structures Assessment Report

Introduction
V&A Consulting Engineers, Inc. (V&A) was retained by the City of Cupertino (City) to perform condition assessments as part of the Storm Drain Outfall Condition Assessment Project . The purpose of the condition assessment was to inventory the storm drain assets and to determine necessary improvements and maintenance activities for the outfall pipes and structures .

The City maintains 17 5 outfall pipe segments, totaling approximately 17,051 feet, within the storm drain network. The outfall pipes discharges urban rainfall runoff from the City into various creeks/channels managed by the Santa Clara Valley Water District (Valley Water). V&A was tasked with assess ing the accessible outfall pipes along with the ir corresponding outfall structure and nearest upstream structure.

The primary assessment method for the upstream and outfall structures consisted of visual examinations and documentation through photographs. Observed defects and corrosion of concrete and metal structures were rated using VANDA Condition Index Ratings. Key attribute information such as GPS location, diameter, pipe material, etc. , of the structures were also documented. Data and attribute information will be submitted in a GIS shapefile format in conjunction with this report.

For the outfall pipes, V&A retained Presidio Systems, Inc. (Presidio) to capture closed -circuit television (CCTV) footage of the pipes.

Figure 1 below presents an overview map of the approximate locations of the outfall and upstream structures that were assessed .
463
CC 03-03-2026 Searchable Packet
463 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 2 Figure 1. Overview map of outfall pipe and structure locations. 464
CC 03-03-2026 Searchable Packet
464 of 495
Project No. 23-0026 – Cupertino Storm Drain Outfall Assessment

3 Assessment Methods
Visual Assessment of Structures
Qualitative visual evaluations were conducted from outside of the assessed structures, focusing on the condition of concrete and metal surfaces. Cracks, delamination, corrosion, and other concrete defects referenced in American Concrete Institute (ACI) 201.1R -92, “Guide for Making a Condition Survey of Concrete in Service” were documented with digital, still photographs. The condition of metal components and coatings were also evaluated and documented. It should be noted that much of the visual assessment data is subjective and is based upon V&A’s extensive experience evaluating concrete and metallic structures in the water and wastewater industries.

Standardized ratings used to characterize condition were assigned based on the VANDA Concrete and Metal Condition Indices, as shown in the subsequent sections. 465
CC 03-03-2026 Searchable Packet
465 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 4 VANDA® Concrete Condition Index
V&A created the VANDA Concrete Condition Index ( Table 1) to provide consistent reporting of corrosion damage based on objective criteria. Concrete condition is rated from Level 1 to Level 5 based upon field observations and measurements, with Level 1 indicating the best case and Level 5 indicating severe damage. The individual criteria are applied based on engineering judgment to arrive at the overall rating.

Table 1. VANDA® Concrete Condition Index
Condition
Rating Description
Representative
Photograph
Level 1 Little or no damage to concrete
▪ Hardness ............... hard surface
▪ Surface profile ....... smooth, apparently intact
▪ Cracks .................... hairline width, minimal frequency ▪ Spalling .................. none
▪ Reinforcement ....... not exposed or damaged
Level 2 Minor surface damage
▪ Hardness ............... soft surface layer to 1/8-inch depth ▪ Surface profile ....... fine aggregate exposed
▪ Cracks .................... hairline width, moderate frequency ▪ Spalling .................. shallow spalling, minimal frequency ▪ Reinforcement ....... not exposed or damaged
Level 3 Moderate surface damage
▪ Hardness ............... soft surface layer to 1/4-inch depth ▪ Surface profile ....... large aggregate exposed or protruding ▪ Cracks .................... up to 1/32-inch width, moderate frequency ▪ Spalling .................. shallow spalling, minimal frequency ▪ Reinforcement ....... exposed; minor damage, minimal frequency Level 4 Loss of concrete mortar and damage to reinforcement ▪ Hardness ............... soft paste beyond 1/4-inch depth ▪ Surface profile ....... large aggregate exposed, loose, or missing ▪ Cracks .................... 1/8- to 1/4-inch width, moderate frequency ▪ Spalling .................. deep spalling, moderate frequency ▪ Reinforcement ....... exposed with damage, moderate frequency Level 5 Bulk loss of concrete and reinforcement
▪ Hardness ............... soft paste beyond 1-inch depth ▪ Surface profile ....... large aggregate exposed, loose, or missing ▪ Cracks .................... over 1/2-inch width, or narrower and frequent ▪ Spalling .................. deep spalling, high frequency ▪ Reinforcement ....... consumed; loss of structural integrity © 2020 V&A Consulting Engineers, Inc. All rights reserved.

466
CC 03-03-2026 Searchable Packet
466 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 5 VANDA® Metal Condition Index
V&A created the VANDA Metal Condition Index ( Table 2) to provide consistent reporting of corrosion damage based on objective criteria. Metal condition is rated from Level 1 to Level 5 based upon field observations and measurements, with Level 1 indicating the best case and Level 5 indicating severe damage. The individual criteria are applied based on engineering judgment to arrive at the overall rating.

Table 2. VANDA® Metal Condition Index
Condition
Rating Description
Representative
Photograph
Level 1 Little or no corrosion
▪ Wall thickness loss, general ...... none
▪ Wall thickness loss, pitting ........ none to minimal ▪ Extent (area) of corrosion .......... may be widespread but superficial

Level 2 Minor corrosion
▪ Wall thickness loss, general ...... up to 20%
▪ Wall thickness loss, pitting ........ up to 20%
▪ Extent (area) of corrosion .......... localized

Level 3 Moderate corrosion
▪ Wall thickness loss, general ...... 20% to 40%
▪ Wall thickness loss, pitting ........ 20% to 60%
▪ Extent (area) of corrosion .......... up to half of surface

Level 4 Severe corrosion
▪ Wall thickness loss, general ...... 40% to 60%
▪ Wall thickness loss, pitting ........ 60% to 100% (pinholes) ▪ Extent (area) of corrosion .......... most of surface

Level 5 Failure or imminent failure
▪ Wall thickness loss, general ...... greater than 60%
▪ Wall thickness loss, pitting ........ 100% (holes)
▪ Extent (area) of corrosion .......... most or all of surface

© 2020 V&A Consulting Engineers, Inc. All rights reserved.

467
CC 03-03-2026 Searchable Packet
467 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 6 Closed-Circuit Television Assessment of Outfall Pipes Presidio perform ed CCTV of the outfall pipes . This method of traditional CCTV consists of a color CCTV camera and light system mounted to a wheeled crawler. The camera is equipped with tilt, rotation, and zoom capabilities to capture detailed observations of defects. Video images are captured via a recording console, and the camera is controlled from the CCTV truck at the surface access point through a coaxial cable that also allows the distance to be recorded in feet. Observations were noted per the National Association of Sewer Services Companies (NASSCO) Pipeline Assessment Certification Program (PACP). The PACP report s from Presidio are attached in Appendix A .

Findings
Outfall Pipes
CCTV assessments of the outfall pipes were conducted between the outfall opening and the nearest upstream catch basin. Presidio assessed approximately 16,000 feet of outfall piping across 176 sites.

These pipes typically consisted of reinforced concrete pipe (RCP) and corrugated metal pipe (CMP).

There were also pipes made of polyethylene (PE), polyvinyl chloride (PVC), cast iron (CI), ductile iron (DI), and high -density polyethylene (HDPE), though these were fewer in number. Pipe sizes varied widely and ranged from 8 to 84 inches. The PACP reports provided by Presidio can be found in Appendix A , and the CCTV videos will be submitted to the City in electronic format.

The CCTV data obtained by Presidio was evaluated using the standards established by the NASSCO PACP. In particular, NASSCO’s Quick Rating standards are used to rate the condition of the pipe segments assessed. The Quick Rating is a four -character code that describes the occurrence of the two highest severity defect grades in a pipeline. Severity grading ranges from 1 to 5. The grades, as defined by NASSCO, are shown in Table 3.

Table 3. NASSCO PACP Rating System
Rating Description
5 Most significant defect grade
4 Significant defect grade
3 Moderate defect grade
2 Minor to moderate defect grade
1 Minor defect grade or no defect

The first and third characters of the Quick Rating code , as shown in Figure 2, describe the highest severity grade and second highest severity grade along the pipe segment, respectively. The second and fourth characters describe how often the highest and second -highest severity grades occurred in a pipe segment. The number of occurrences is represented by a number between 1 and 9. However, if the number of occurrences exceeds 9, letters are used to represent a range of numbers. For example, the letter A represents 10 to 14 occurrences, B represents 15 to 19, C represents 20 to 24, etc. Figure 2 below is a graphic from the NAASCO/PACP manual that further describes this coding system. 468
CC 03-03-2026 Searchable Packet
468 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 7 Figure 2. NAASCO/PACP Quick Ratings graphic.

Defects are also split into two categories: structural and operations and maintenance (O&M). Structural defects typically rate the structural integrity of a structure and note defects such as cracking, holes, deformation, joint separations, and more. O&M defects categorize the observations that have an impact on the maintenance and operations of a pipe, such as sediment deposits, roots, obstacles, pipe turns, and more. Structural defects typically represent a higher priority than O&M defects.

Presidio assessed 205 pipe segments across 175 sites. However, 2 1 sites could not be assessed either due to a lack of access or because the access structures could not be located. A list of the unassessed outfall pipes is compiled in Appendix E. The reason that the number of pipe segments exceeded the number of sites is that several previously unknown manholes were discovered during the CCTV assessments. These manholes were named after the connecting outfall and given a letter (i.e.

SWST1375A). The letters would progress from A, B, C, etc., if there were multiple unknown manholes in the pipeline.

Table 4 summarizes the number of occurrences of NASSCO structural defects as the highest defect grade along a pipe segment. The NASSCO structural ratings of individual pipe segments can be referenced in Appendix B along with overview maps of the structural Grade 4 and Grade 5 defects.

Table 4. Summary of Highest Structural Defect Grades Across Assessed Pipe Segments Highest NASSCO
Defect Grade Rating Description
No. of Pipe
Segments Percentage of Total
5 Most significant defect grade 52 26%
4 Significant defect grade 11 5%
3 Moderate defect grade 34 17%
2 Minor to moderate defect grade 2 1%
1 Minor defect grade or no defects 106 52%

469
CC 03-03-2026 Searchable Packet
469 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 8 Table 5 summarizes the number of occurrences of NASSCO O&M defect grades as the highest defect grade along a pipe segment. The NASSCO O&M ratings of individual pipe segments can be referenced in Appendix B along with overview maps of the O&M Grade 4 and Grade 5 defects.

Table 5. Summary of Highest O&M Defect Grades Across Assessed Pipe Segments Highest NASSCO Defect
Grade Rating Description
No. of Pipe
Segments Percentage of Total
5 Most significant defect grade 19 9%
4 Significant defect grade 21 10%
3 Moderate defect grade 41 20%
2 Minor to moderate defect grade 54 26%
1 Minor defect grade or no defects 70 34%

The condition of the outfall pipes varied depending on the material used. RCP was one of the most common material types and typically only exhibited Grade 2 structural defects and lower . Grade 3 defects were uncommon but did appear in some of the outfall pipe segments. Grade 4 to 5 defects were rare but were present in a few outfall pipes .

CMP was another common material used for pipelines. Many pipelines that were comprised of multiple materials typically used CMP at the end of a pipeline towards the outfall. Grade 3, 4, and 5 defects were common in pipelines that were constructed from CMP. This is because CMP is susceptible to corrosion, which leads to holes developing in the pipes. The lining, if present, would typically also degrade at the bottom half of the pipe. Though not as common, a number of CMP pipelines also showed signs of deformation. Similar to the RCP pipelines, O&M defects usually consisted of roots present in the pipe or sediment and debris.

Uncommon material types, such as plastic, which includes PVC and HDPE, and metals, such as DI and CI, were typically in good condition. Plastic pipes had very few defects and no Grade 4 or 5 defects except for one HDPE pipe that had nails puncturing the pipe walls. The metal segments of the pipelines, not including CMP, were also in good condition and had no Grade 4 or 5 defects.

O&M defects were generally slightly more common than structural defects and usually had to do with debris or obstructions in the pipeline. The Grade 4 and Grade 5 defects usually represented a level of debris in the pipeline that prevented or nearly prevented the CCTV crawler from progressing further into a pipe. Lower grades were usually roots in the pipes or lower levels of sediment.

Photo 1 through Photo 12 show some of the notable structural and O&M defects for the outfall pipes.

Appendix B provides a list of the assessed outfall pipes along with a summary of the structural and O&M defects, and the NASSCO Quick Rating for each pipe segment. 470
CC 03-03-2026 Searchable Packet
470 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 9 Photo 1. Broken RCP (Grade 4); SWPP724. Photo 2. Crack longitudinal hinge on RCP, (Grade 4); SWPP4745.

Photo 3. Grade 4 structural defect on CMP; Grade 3
O&M defect (debris); SWPP4896.

Photo 4. Grade 5 structural defect on CMP (hole);
SWPP1698.

Photo 5. Grade 5 structural defect on CMP (holes at
invert); SWPP3232.

Photo 6. Grade 5 structural defecton CMP (large
hole/void); SWPP3360.
471
CC 03-03-2026 Searchable Packet
471 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 10 Photo 7. Hole with soil visible on CMP (VANDA Level 5); SWPP4745.

Photo 8. Hole in CMP pipeline due to corrosion (Grade
5); SWPP4896.

Photo 9. O&M Grade 4 defect due to debris;
SWPP4643.

Photo 10. O&M Grade 5 defect due to debris;
SWPP3661.

Photo 11. O&M Grade 4 defect due to concrete
deposits; SWPP1546
Photo 12. Grade 5 defect due to roots, dirt, and debris; SWPP3283.

472
CC 03-03-2026 Searchable Packet
472 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 11 Outfall Structures
V&A assessed the condition of 117 outfall structures . This number does not include those that could not be located or accessed during the assessment . The assessed structures consisted of open channels, concrete headwalls , and other features . At some sites, no structure existed , and the outfall pipe was exposed to the surrounding environment. The condition of these structures was evaluated using the VANDA rating scale described in Sections 1.1.1 and 1.1.2.

Most of the sites with structures were in VANDA Level 2 to 3 condition. This indicates that the structures were typically in good to moderate condition. Of the 117 outfalls , three (3) were in VANDA Level 5 condition, and three (3) were in VANDA Level 4 condition, which are considered poor condition s. Table 6 summarizes the VANDA ® concrete condition ratings of the outfall structures. Individual structure ratings are provided in Appendix B.

Table 6. Summary of VANDA® Concrete Condition Ratings for Outfall Structures VANDA ® Concrete Condition Rating Rating Description No. of Structures 5 Severe damage, imminent failure 3
4 Moderate to severe damage 3
3 Moderate surface damage 23
2 Minor surface damage 76
1 Little or no damage to concrete 12

Level 5 defects are defined by structural failures or imminent failures of the outfall structures. These would include the collapse of the structure, the structure no longer being able to support the pipe, and major structural defects such as large cracks , breaks, or undermining of the structure. Photo 13 through Photo 15 show the three structures that were in VANDA Level 5 condition, such as structure SWST3548, which collapsed on itself and the pipe.

Level 4 defects are characterized by moderate to severe damage to the structure that has not yet reached the point of failure or imminent failure but is likely to reach that point in the near future. In the case of the outfall structures, missing structural elements, moderate to severe concrete deterioration, and moderate to severe cracking are indicative of a Level 4 condition. Photo 16 through Photo 18 show the Level 4 condition outfall structures.

Level 3 defects are characterized by moderate damage to the structure. This would include large aggregate visible due to concrete deterioration, moderately frequent cracks , and spalling of the concrete . Photo 19 through Photo 22 examples of structures with Level 3 defects.

Level 2 defects are defined as minor damage to structures and were the most common . Defects include small aggregate being visible and superficial cracks on the concrete surface. Photo 23 and Photo 24 are examples of the minor surface damage that denotes Level 2 defects for the structures.

Level 1 condition is characterized by structures having no defects . 473
CC 03-03-2026 Searchable Packet
473 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 12 Photo 13. Collapsed outfall structure SWST3548 (VANDA Level 5).

Photo 14. Large cracking of outfall structure;
undermining (VANDA Level 5); SWST25337.

Photo 15. Failure of the headwall and undermining at
SWST3786 (VANDA Level 5).

Photo 16. Collapsed outfall structure SWST2041 (VANDA
Level 4).

Photo 17. Severe damage to outfall headwall SWST4805
(VANDA Level 4).

Photo 18. Severe damage to outfall headwall SWST4807
(VANDA Level 4).
474
CC 03-03-2026 Searchable Packet
474 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 13 Photo 19. Spalling of outfall structure SWST26153
(VANDA Level 3).

Photo 20. Moderate surface damage on outfall structure
SWST25297 (VANDA Level 3).

Photo 21. Moderate cracking of outfall structure
SWST26153 (VANDA Level 3).

Photo 22. Moderate surface damage and cracking of
outfall structure SWST3528 (VANDA Level 3).

Photo 23. Minor surface damage to outfall structure
SWST433 (VANDA Level 2).

Photo 24. Minor surface damage to outfall structure
SWST3549 (VANDA Level 2).

475
CC 03-03-2026 Searchable Packet
475 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 14 Upstream Structures
V&A assessed the condition of 1 45 upstream structures, not including several structures that could not be found or accessed at the time of the assessment . It should be noted that several previously unknown manholes/upstream structures were discovered throughout the CCTV assessment, but the se were not visually assessed.

The concrete surfaces of the upstream structures were typically in good condition across the board.

Most structures were either in VANDA Level 2 or 3 condition , meaning they were in good or moderate condition, respectively . Of the 145 structures, none were in VANDA Level 5 condition, and three (3) were in VANDA Level 4 condition , which is poor condition . Some structures were inaccessible and couldn’t be assessed. Table 7 summarizes the VANDA ® concrete condition ratings of the structures. Individual structure ratings are provided in Appendix B.

Table 7. Summary of VANDA® Concrete Condition Ratings for Upstream Structures VANDA ® Concrete
Condition Rating Rating Description No. of Manholes
5 Bulk loss of concrete and reinforcement 0
4 Loss of concrete mortar and damage to reinforcement 3 3 Moderate surface damage 37
2 Minor surface damage 99
1 Little or no damage to concrete 6

Defects in the upstream structures are categorized similarly to those in the outfall structures.

SWST24885 , SWST10461 , and SWST2015 were the three structures with a Level 4 condition rating.

SWST24885 was found with multiple large cracks s panning the structure that could jeopardize the structural integrity of the catch basin . SWST10461 exhibited signs of moderate surface damage and multiple gaps that exposed voids. These voids left gaps at the joint in the structure and underneath the cover frame. SWST2015 had a broken catch basin cover. Photo 25 through Photo 27 show these observations.

Level 3 defects primarily consisted of moderate cracking, moderate surface damage that exposed large aggregates, concrete spalling of the concrete surfaces, and degradation of the concrete underneath the cover frame. Photo 28 through Photo 33 show common examples of Level 3 defects in the upstream structures.

Like the outfall structures, Level 2 defects were the most common and typically consisted of minor surface damage exposing small aggregate and superficial cracking along the concrete surfaces. Photo 34 and Photo 35 show what those defects generally looked like.

476
CC 03-03-2026 Searchable Packet
476 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 15 Photo 25. Frequent cracking along catch basin
SWST24885 (VANDA Level 4).

Photo 26. Moderate surface damage and voids in
SWST10461 (VANDA Level 4).

Photo 27. Broken catch basin cover; SWST2015 (VANDA
Level 4).

Photo 28. Moderate crack in structure SWST3066
(VANDA Level 3).

Photo 29. Moderate surface damage in SWST434
(VANDA Level 3).

Photo 30. Moderate cracking of SWST1411 (VANDA
Level 3).
477
CC 03-03-2026 Searchable Packet
477 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 16 Photo 31. Concrete spalling and moderate cracking of SWST4473 (VANDA Level 3).

Photo 32. Deterioration of concrete under cover frame in SWST2156 (VANDA Level 3).

Photo 33. Moderate surface damage of SWST15657
SWST26153 (VANDA Level 3).

Photo 34. Minor surface damage SWST2412 (VANDA
Level 2).

Photo 35. Minor surface damage of SWST1179 (VANDA
Level 2).

478
CC 03-03-2026 Searchable Packet
478 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 17 GIS Discrepancies
There were a number of discrepancies between what had been previously recorded in the GIS data and what was discovered during the field assessments. These discrepancies included differing pipe diameters and lengths , additional structures that weren’t previously recorded , and missing/non -existent structures or pipes . A list of these discrepancies and their associated site has been compiled in Appendix D.

Conclusions
Based on the findings of the condition assessment , V&A presents the following conclusions for the condition of the outfall pipes and their associated structures .

Outfall pipes
▪ From a structural perspective:
▪ RCP, PVC, PE, HDPE, DI, and CI pipe segments were typically in good condition with only a few outliers, if any.
▪ CMP pipe segments typically varied from moderate to poor condition. Corrosion was very common in these pipelines and sometimes resulted in the formation of holes within the piping.

Some of the pipes also showed signs of deformation.
▪ From an O&M standpoint:
▪ Roots, debris, and sediment have caus ed moderate to significant O&M defect grades for 40% of the outfall pipes with 49% of these segments having Grade 4 or Grade 5 O&M defects . ▪ 60% of the outfall pipes have minor O&M defects. In general, these defects do not warrant action at this time.

Outfall and Upstream Structures
▪ A vast majority of outfall structures were in VANDA Level 1 or 2 condition. 23 structures were in VANDA Level 3 condition, three (3) were in VANDA Level 4 condition, and another three (3) were in VANDA Level 5 condition.
▪ Like the outfall structures, the upstream structures were mostly in VANDA Level 1 or 2 condition. 37 structures were in VANDA Level 3 condition, three (3) were in VANDA Level 4 condition, and none were in VANDA Level 5 condition .

479
CC 03-03-2026 Searchable Packet
479 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 18 Recommendations
Based on the results of the condition assessment , V&A presents the following recommendations for the City to consider.

Outfall pipes
Table 8 summarizes the repair and rehabilitation recommendations for the outfall pipes.

Table 8. Summary of Outfall Pipe Repair and Rehabilitation Recommendations NASSCO Defect
Grade
No. of Pipe
Segments Recommendation
5 52 Repair or rehabilitate pipe s within 2 years
4 11 Repair or rehabilitate pipe s in 2 – 5 years
3 34 Repair or rehabilitate pipe s in 5 – 10 years
2 2 Reassess pipe s in 10 years
1 106 Reassess pipe s in 10 years

Table 9 summarizes the O&M recommendations for the outfall pipes.

Table 9. Summary of Outfall Pipe O&M Recommendations
NASSCO Defect
Grade
No. of Pipe
Segments Recommendation
5 19 Perform maintenance prior to the upcoming wet weather season 4 21 Perform maintenance within 2 years
3 41 Perform maintenance in 2 – 5 years
2 54 Reassess pipe s in 10 years
1 70 Reassess pipe s in 10 years

Outfall and Upstream Structures
Table 10 summarizes the repair recommendations for the outfall structures.

Table 10. Summary of Outfall Structure Repair Recommendations VANDA ® Concrete
Condition Rating No. of Structures Recommendation
5 3 Repair the structure s within 2 years
4 3 Repair the structure s in 2 – 5 years
3 23 Repair the structure s in 5 – 10 years
2 76 Reassess the structure s in 10 years
1 12 Reassess the structure s in 10 years

480
CC 03-03-2026 Searchable Packet
480 of 495
Project No. 23 -0026 – Cupertino Storm Drain Outfall Assessment 19 Table 11 summarizes the repair recommendations for the upstream structures.

Table 11. Summary of Upstream Structure Repair Recommendations VANDA ® Concrete
Condition Rating No. of Structures Recommendation
5 0 Repair the structure s within 2 years
4 3 Repair the structure s in 2 – 5 years
3 37 Repair the structure s in 5 – 10 years
2 99 Reassess the structure s in 10 years
1 6 Reassess the structure s in 10 years

481
CC 03-03-2026 Searchable Packet
481 of 495

CITY OF CUPERTINO
Agenda Item
25-14650 Agenda Date: 3/3/2026
Agenda #: 12.

Subject: City Manager Report
CITY OF CUPERTINO Printed on 2/26/2026Page 1 of 1
powered by Legistar™
482
CC 03-03-2026 Searchable Packet
482 of 495

Thursday, February 26, 2026
A Message from the City Manager
Hello Neighbors,
As February unfolds, our community has already experienced meaningful moments of connection, including celebrating locally for the Big Game and the first monthly Mayor Chat of the Year. With Presidents’ Day weekend and the Mid-Year Recess for local schools, it has been encouraging to see neighbors staying active and engaged.

In this edition, you’ll find opportunities to share your input, including the Health and Safety Element, now open for public review, along with an update on the Priority Housing Site townhome development and details about upcoming events such as tonight’s annual State of the City, the Big Bunny 5K, and the Teen Resource Fair.

Thank you for staying engaged and informed. Our work continues to be shaped by your feedback and participation. I hope to see many of you at the State of the City address tonight at Quinlan Community Center. Doors open at 6 p.m. and the program begins at 6:30 p.m.

Read the full City Manager’s Newsletter February 26, 2026 and all previous editions at cupertino.gov/cmnewsletter.

Warm Regards,

Tina Kapoor, City Manager

483
CC 03-03-2026 Searchable Packet
483 of 495

CITY OF CUPERTINO
Agenda Item
25-14624 Agenda Date: 3/3/2026
Agenda #: 13.

Subject: Councilmember Reports
CITY OF CUPERTINO Printed on 2/26/2026Page 1 of 1
powered by Legistar™
484
CC 03-03-2026 Searchable Packet
484 of 495
1 CITY COUNCILMEMBER REPORT
Meeting: March 3, 2026

Reporting Councilmember: Councilmember J.R. Fruen

Report Dates: 2/10/26 to 2/23/26

Item Date, Title, and Description:

Event 1. February 10, 2026 – Meeting with the City Manager – I met with City Manager Tina Kapoor to go over upcoming council agenda items, items of interest, and issues raised by residents.

Event 2. February 11, 2026 – Working Families Housing Policy Committee – I attended this meeting at the invitation of Working Partnerships USA as part of an effort to develop alternative funding models for affordable housing development. I provided information and feedback.

Event 3. February 12, 2026 – Santa Clara County Library District JPA Board Meeting – I attended this meeting in my capacity as Cupertino’s representative on the Board. Meeting materials are available at the Library District’s website here.

Event 4. February 12, 2026 – Cities Association of Santa Clara County Legislative Action Committee Meeting – I attended this meeting in my capacity as the LAC’s former chair and the CASCC’s Vice President to supply additional context and information as needed.

Event 5. February 19, 2026 – Cupertino Chamber of Commerce Lunar New Year Luncheon – I attended this annual event to celebrate the Lunar New Year. This year’s event shifted venues to the Marriot Residence Inn at Main Street and was exceptionally well attended.

Event 6. February 23, 2026 – Meeting with the City Manager – I met with City Manager Tina Kapoor to go over upcoming council agenda items, items of interest, and issues raised by residents.

485
CC 03-03-2026 Searchable Packet
485 of 495
1 CITY COUNCILMEMBER REPORT
Meeting: March 3, 2026

Reporting Councilmember: Councilmember Sheila Mohan

Report Dates: 2/10/26 to 2/23/26

Item Date, Title, and Description:

2/19/26 Attended the Lunar New Year Celebration hosted by the Cupertino Chamber of Commerce. As always, the event was well attended, well organized and entertaining. Thanks to Chamber staff, volunteers and sponsors for their efforts.

2/20/26 Participated in a panel discussion hosted by high school students on the challenges facing Cupertino. Questions were mostly about bike lanes, the SV hopper, enrollment issues and housing.

486
CC 03-03-2026 Searchable Packet
486 of 495
1 CITY COUNCILMEMBER REPORT
Meeting: March 3, 2026

Reporting Councilmember: Mayor Kitty Moore

Report Dates: 2/9/26 to 2/23/26

Item Date, Title, and Description:

February 9, 2026. Agenda look-ahead with Staff.

February 9, 2026. SVCE Chinese Class. Introduction to the Lunar New Year holiday customs and associated Mandarin phrases.

February 9, 2026. Sheriff Contract Ad Hoc Committee meeting.

February 10, 2026. Met with staff to discuss the Legislative Review Committee.

February 11, 2026. Special City Council Meeting Closed Session.

February 11, 2026. Check in with City Manager.

February 11, 2026. Monthly Mayor’s Chat at Monta Vista Recreation Center.

Delivered a Mayor’s Report, took Q and As with Mayor and Staff live and remote responding, this was an exciting refinement. The meeting was very well attended, which was greatly appreciated.

February 12, 2026. VTA Policy Advisory Committee. Agenda Packet:
https://santaclaravta.iqm2.com/Citizens/FileOpen.aspx?Type=1&ID=4355&Inline=T rue The Sunnyvale Via shuttle for the Peery Park area was discussed and there was notable interest in having shuttles for all of the cities. We will be discu ssing micro transit at a future meeting with cities providing input from how our system is doing in terms of cost, ridership, and long-term sustainability. 487
CC 03-03-2026 Searchable Packet
487 of 495
City Council Mayor Moore Report

2 February 13, 2026. D5 Mayors Meeting with Supervisor Abe-Koga. Discussed the unhoused, the unhoused task force report, rotating safe parking, and RV ordinances.

February 18, 2026. Agenda look-ahead meeting with Staff.

February 18, 2026. Sheriff’s Contract Ad-hoc Committee meeting.

February 19, 2026. Cupertino Chamber of Commerce Lunar New Year Celebration.

The Chamber’s event sold out this year! This lively and fun event included a dragon which greatly enjoyed eating all of the red envelopes!

February 19, 2026. Special and Regular Meeting of the Cupertino City Council.

February 19, 2026. Check in with Staff.

February 21, 2026. Visited a CARES Emergency Operations drill at City Hall briefly before getting my Ham/GMERS radio programmed. In
Cupertino, CERT (Community Emergency Response Team) focuses on hands-on disaster skills like search and rescue, first aid, and fire safety to assist neighbors when professional help is delayed. CARES (Cupertino Amateur Radio Emergency Service), meanwhile, manages emergency communications, using ham radio to link the city’s Emergency Operations Center with various field sites when standard networks fail. Essentially, CERT handles the physical response on the ground, while CARES ensures the flow of critical information through the airwaves.

February 22, 2026. ANCCS Year of the Horse Celebration at the Taipei Cultural Center in Milpitas. Attended this event with local
electeds with an opportunity to share the
Cupertino Mandarin Staff learning program with
Principal Kuo and Vice Mayor Chao present.

Additionally, we had an opportunity to practice
our Chinese calligraphy, were led in an amusing
dance, and I visited with the Story Lamp project
coordinators who travel with student art displays
sharing the theme of family and food traditions of
Taiwan to learn about their project.

488
CC 03-03-2026 Searchable Packet
488 of 495
City Council Mayor Moore Report

3 February 23, 2026. Continued working on SOTC event.

February 23, 2026. SVCE Chinese Class. Today we learned about the Spring Festival and customs. Happy Lunar New Year and Happy Spring Festival! (March 3, 2026)

489
CC 03-03-2026 Searchable Packet
489 of 495

CITY OF CUPERTINO
Agenda Item
25-14694 Agenda Date: 3/3/2026
Agenda #: 14.

Subject: Upcoming Draft Agenda Items Report
CITY OF CUPERTINO Printed on 2/26/2026Page 1 of 1
powered by Legistar™
490
CC 03-03-2026 Searchable Packet
490 of 495
Upcoming Draft Agenda Items

CITY OF CUPERTINO
Ci
ty Council
Tuesday, March 17, 2026
Study SessionStudy Session
26-14827 Su bject: Study Session on the Wolfe Road Project Consent Calendar
26-14792 Subject: Approval of an Amendment to Agreement with Granicus in the am
ount of $______
26-14778 Subject: 2025 General Plan and Housing Element Annual Progress Report (
APR)
26-14894 Subject: Review of Future agenda items requested by City Co
uncilmembers (“TBD List”)
26-14896 Su bject: Approval of February 24, 2026 City Council meeting minutes 26-14897 Subject: Award a construction contract for the 2025 Concrete R
econstruction Project to Villalobos & Associates, Inc. for removal and replacement of concrete curbs, gutters, sidewalks, and pedestrian ramps in the amount of $1,105,202.14
25-14213 Subject: Approval of an agreement to replace Cupertino’s HR and Fi
nancial Enterprise Resource Planning (ERP) system
25-14424 Su bject: Ratifying Accounts Payable for the periods ending 25-14671 Su bject: Approval of March 3, 2026 City Council meeting minutes Public Hearings
26-14876 Subject: Consider a Tentative Map, Architectural and Site Approval, and T
ree Removal Permit for the construction of a 51-unit townhome condominium development on Priority Housing Sites 29 through 32. The project utilizes Senate Bill 330 and provisions of State Density Bonus law. (Application No(s): TM-2024-009, ASA-2024-015, TR-2024-044; Applicant:

SummerHill Homes, LLC; Location: 10857, 10867, 10877, and 10887 Linda Vista Drive; APNs: 356-06-001, -002, -003, and -004).

Future Agenda Items
25-14695 Su bject: Upcoming Draft Agenda Items Report
Action Calendar
25-14490 Subject: Adopt the Other Post-Employment Benefits (OPEB) and Pension T
rust Investment Policies

Page 1 ends

DRAFT
491
CC 03-03-2026 Searchable Packet
491 of 495
Thursday, February 26, 2026
26-
14889 Subject: Consider Potential November 2026 Revenue Ballot Measure. (
Continued on February 19, 2026)
26-14785 Subject: Introduce Ordinance No. 25-2279: “An Ordinance of the City Co
uncil of the City of Cupertino Amending City Code Title Five (Business Licenses and Regulations) to Establish Chapter 5.51 to Regulate Film Production.”
26-14851 Su bject: City property - Blesch for City Work Program Councilmember Reports
25-14625 Su bject: Councilmember Reports
City Manager Report
25-14651 Su bject: City Manager Report
Tuesday, April 7, 2026
Ceremonial ItemsCeremonial Items
26-14833 Su bject: Proclamation in Recognition of April as Donate Life Month Consent Calendar
26-14773 Su bject: Receive the Monthly Treasurer's Report for 26-14754 Subject: Construction contract for the Sports Center and Quinlan Co
mmunity Center Rooftop Repair Project, to address leaks, to ______ in the amount of $______.
25-14672 Su bject: Approval of March 17, 2026 City Council meeting minutes 25-14436 Su bject: Ratifying Accounts Payable for the periods ending Public Hearings
25-14593 Subject: Consider a Use Permit, Tentative Map, Architectural and Site Appr
oval, and Tree Removal Permit to consider the construction of a 122-unit residential development, consisting of 66 small-lot single family homes and 56 townhomes at Steven’s Creek Office Center and a retail building (Voyager Coffee and Panera Bread). The project utilizes Senate Bill 330 and provisions of State Density Bonus law. (Application No(s):

U-2024-008, TM-2024-006, ASA-2024-011, TR-2024-033; Applicant(s):

Harvest Properties, Inc.; Location: 20807, 20813, 20823, & 20883 Stevens Creek Blvd; APNs: 326 32 050, -051, -052, and-053).

Future Agenda Items
25-14696 Su bject: Upcoming Draft Agenda Items Report
Action Calendar

Page 2 ends

DRAFT
492
CC 03-03-2026 Searchable Packet
492 of 495
Thursday, February 26, 2026
25-
14125 Subject: Introduce first reading of an ordinance to make minor updates an
d minor technical corrections to the Cupertino Municipal Code as follows: amending (Title 5 Business Licenses and Regulations, Chapter

5.04 Administration, Section 5.04.480 Appeal Procedure) and (Title 11 Streets and Vehicles, Chapter 11.28 Miscellaneous Parking Regulations, Sections 11.28.010 Definitions and 11.28.050 Sale of Merchandise); 3.23.020 Definitions. ("Public works project") to align with AB2192; 13.04.180 Advertising and Sale Restrictions; 13.04.130 Behavior of Persons in Parks (P) Feeding Waterfowl Prohibited
25-14532 Subject: Review of contractual duties and scope of work for Cupertino Ch
amber of Commerce agreement (Moore/Chao added by email on 10/1/25 and 11/10/25)
26-14755 Subject: Revisions to Plastic Bag ordinance to align with State r
equirements.
26-14886 Su bject: Regional Plans to Address Homelessness Councilmember Reports
25-14626 Su bject: Councilmember Reports
City Manager Report
25-14652 Su bject: City Manager Report
Tuesday, April 21, 2026
Ceremonial ItemsCeremonial Items
26-14861 Su bject: Recognition of Administrative Professionals Week, April 19-25 Consent Calendar
26-14758 Subject: Award a Construction contract for the 2026 Pavement M
aintenance Phase 1 Project to ___________ in the amount of $__________.
26-14759 Subject: Extension of Contract with _____ for Crossing Guard services for a t
erm of two years
26-14760 Su bject: Authorize the installation of a new traffic signal at Tantau/Forge 26-14761 Subject: Award a Construction contract for the 2026 Pavement M
aintenance Phase 2 Project to ___________ in the amount of $__________.
25-14673 Su bject: Approval of April 7, 2026 City Council meeting minutes

Page 3 ends

DRAFT
493
CC 03-03-2026 Searchable Packet
493 of 495
Thursday, February 26, 2026
25-
14128 Subject: Second reading and enactment of an ordinance to make minor u
pdates and minor technical corrections to the Cupertino Municipal Code as follows: amending (Title 5 Business Licenses and Regulations, Chapter

5.04 Administration, Section 5.04.480 Appeal Procedure) and (Title 11 Streets and Vehicles, Chapter 11.28 Miscellaneous Parking Regulations, Sections 11.28.010 Definitions and 11.28.050 Sale of Merchandise); 3.23.020 Definitions. ("Public works project") to align with AB2192; 13.04.180 Advertising and Sale Restrictions; 13.04.130 Behavior of Persons in Parks (P) Feeding Waterfowl Prohibited
25-14427 Su bject: Receive the Monthly Treasurer's Investment Report for Future Agenda Items
25-14697 Su bject: Upcoming Draft Agenda Items Report
Action Calendar
25-14521 Subject: Approval to execute a contract with Santa Clara County Office of t
he Sheriff for a five-year period 2025/26 to 2030/31
Councilmember Reports
25-14627 Su bject: Councilmember Reports
City Manager Report
25-14653 Su bject: City Manager Report
Tuesday, May 5, 2026
Ceremonial ItemsCeremonial Items
26-14862 Su bject: Recognition of Law Day on Friday, May 1, 2026 26-14863 Subject: Recognition of Public Service Recognition Week (first full week o
f May), Sunday, May 3, 2026-Saturday, May 9, 2026
Consent Calendar
25-14674 Su bject: Approval of April 21, 2026 City Council meeting minutes 25-14446 Su bject: Receive the Monthly Treasurer's Report for 25-14428 Su bject: Receive the Monthly Treasurer's Investment Report for 25-14066 Subject: Approve a Fourth Amendment with Avocette Technologies, Inc., f
or Accela Configuration and Support services for a total not-to-exceed amount of $620,300 through June 30, 2028.
25-14201 Subject: Accept Federal grant funding and award design professional s
ervices agreement to XXXXXXXX for a total-not-to-exceed contract amount of $XXX,XXX for the McClellan Road Bridge Reconstruction Project.

Future Agenda Items
25-14698 Su bject: Upcoming Draft Agenda Items Report
Councilmember Reports

Page 4 ends

DRAFT
494
CC 03-03-2026 Searchable Packet
494 of 495
Thursday, February 26, 2026
25-
14628 Subject: Councilmember Reports
City Manager Report
25-14654 Su bject: City Manager Report
Monday, May 11, 2026
Study SessionStudy Session
26-14871 Su bject: Proposed Budget FY26-27 Study Session Tuesday, May 19, 2026
Study Session
25-14461 Subject: Initial Study Session on Fiscal Year (FY) 2026-27 Proposed B
udget
Ceremonial Items
26-14864 Su bject: Recognition of Public Works Week, May 17-23, 2026 Consent Calendar
26-14791 Su bject: Accept the Grants Policy Update and Staff Report 26-14895 Subject: Award a contract to XXX, for STEAM Enrichment Programs for a t
otal not-to-exceed amount of $XXX.
25-14463 Su bject: Accept the City's Investment Policy
25-14464 Subject: Receive the FY 2024-25 Annual Comprehensive Financial Report (
ACFR) and related supplemental reports
25-14455 Su bject: Receive the Treasurer's Investment Report for Quarter Ending 25-14460 Subject: Receive the City Manager's Third Quarter Financial Report for Fi
scal Year 2025-26
25-14437 Su bject: Ratifying Accounts Payable for the periods ending 25-14675 Su bject: Approval of May 5, 2026 City Council meeting minutes Future Agenda Items
25-14699 Su bject: Upcoming Draft Agenda Items Report
Action Calendar
25-14162 Su bject: Introduction of Amendments to Municipal Code Section 2.88.100 Duties-Powers-Responsibilities of the Audit Committee
Councilmember Reports
25-14629 Su bject: Councilmember Reports
City Manager Report
25-14655 Su bject: City Manager Report

Page 5 ends

DRAFT
495
CC 03-03-2026 Searchable Packet
495 of 495

← All documents from this meeting