City of Cupertino, CA
Resolution 26-XXX
Fee Effective July 1, 2026
Schedule D - Table 1 Plan Check and Inspection Fees
Related IBC
Class
Building Use
(e.g., IBC Occupancy Type) Sq. Ft. Permit Tech
Cost
Plan Check
Cost
Inspection
Cost
Plan Check
CostInspection Cost
A Assembly 250 $133 $4,740 $4,462 $126.41 $132.29 1,250 $266 $6,004 $5,652 $126.41 $142.80
2,500 $266 $7,584 $7,437 $101.13 $5.32
5,000 $399 $10,113 $7,437 $25.28 $39.67
12,500 $399 $12,009 $10,412 $22.75 $34.38
25,000 $532 $14,853 $14,577 $59.41 $60.44
A A Occupancy Tenant Improvements 500 $266 $3,792 $4,462 $47.40 $87.67 2,500 $532 $4,740 $5,950 $50.56 $83.30
5,000 $532 $6,004 $8,032 $44.24 $5.32
10,000 $798 $8,216 $8,032 $8.43 $21.82
25,000 $798 $9,481 $11,305 $8.85 $18.91
50,000 $1,064 $11,693 $15,767 $23.39 $33.66
B Business 1,000 $266 $6,004 $6,545 $39.50 $58.71 5,000 $532 $7,584 $8,627 $44.24 $53.55
10,000 $532 $9,797 $11,305 $34.76 $29.43
20,000 $798 $13,273 $13,982 $7.37 $6.94
50,000 $798 $15,485 $16,065 $7.58 $13.03
100,000 $1,064 $19,277 $22,312 $19.28 $23.38
B B Occupancy Tenant Improvements 300 $133 $4,740 $3,570 $105.34 $135.03 1,500 $266 $6,004 $5,057 $105.34 $79.33
3,000 $266 $7,584 $6,247 $94.81 $4.43
6,000 $399 $10,429 $6,247 $17.56 $29.75
15,000 $399 $12,009 $8,925 $18.96 $22.70
30,000 $532 $14,853 $12,197 $49.51 $42.43
E Educational 100 $133 $4,740 $3,570 $316.02 $330.73 500 $266 $6,004 $4,760 $316.02 $356.99
1,000 $266 $7,584 $6,545 $284.42 $13.29
2,000 $399 $10,429 $6,545 $52.67 $89.25
5,000 $399 $12,009 $9,222 $56.88 $74.06
10,000 $532 $14,853 $12,792 $148.53 $133.24
E E Occupancy Tenant Improvements 100 $133 $3,476 $3,570 $237.01 $256.35 500 $266 $4,424 $4,462 $252.81 $297.49
1,000 $266 $5,688 $5,950 $189.61 $13.29
2,000 $399 $7,584 $5,950 $42.14 $79.33
5,000 $399 $8,849 $8,330 $44.24 $68.11
10,000 $532 $11,061 $11,602 $110.61 $121.34
F Factory Industrial 1,000 $266 $6,636 $6,842 $23.70 $51.27 5,000 $532 $7,584 $8,627 $37.92 $53.55
10,000 $532 $9,481 $11,305 $41.08 $29.43
20,000 $798 $13,589 $13,982 $6.32 $6.94
50,000 $798 $15,485 $16,065 $3.79 $13.03
100,000 $1,064 $17,381 $22,312 $17.38 $23.38
F F Occupancy Tenant Improvements 1,000 $266 $5,372 $5,355 $31.60 $51.27 5,000 $532 $6,636 $7,140 $37.92 $47.60
10,000 $532 $8,532 $9,520 $31.60 $2.66
20,000 $798 $11,693 $9,520 $6.32 $12.89
50,000 $798 $13,589 $13,387 $6.32 $11.24
100,000 $1,064 $16,749 $18,742 $16.75 $19.81
H High Hazard 100 $133 $6,636 $4,760 $395.02 $405.10 500 $266 $8,216 $6,247 $505.63 $356.99
1,000 $266 $10,745 $8,032 $379.22 $13.29
2,000 $399 $14,537 $8,032 $84.27 $109.08
5,000 $399 $17,065 $11,305 $82.16 $91.91
10,000 $532 $21,173 $15,767 $211.73 $162.99
H H Occupancy Tenant Improvements 100 $133 $3,792 $3,570 $237.01 $330.73 500 $266 $4,740 $4,760 $316.02 $356.99
1,000 $266 $6,320 $6,545 $221.21 $13.29
2,000 $399 $8,532 $6,545 $52.67 $89.25
5,000 $399 $10,113 $9,222 $44.24 $74.06
10,000 $532 $12,325 $12,792 $123.25 $133.24
I Institutional 500 $266 $7,584 $5,057 $94.81 $102.54 2,500 $532 $9,481 $6,842 $113.77 $83.30
5,000 $532 $12,325 $8,925 $88.49 $5.32
10,000 $798 $16,749 $8,925 $18.96 $25.78
25,000 $798 $19,593 $12,792 $18.96 $20.10
50,000 $1,064 $24,333 $17,552 $48.67 $37.23
I I Occupancy Tenant Improvements 100 $133 $4,740 $3,570 $316.02 $330.73 500 $266 $6,004 $4,760 $316.02 $297.49
1,000 $266 $7,584 $6,247 $284.42 $13.29
2,000 $399 $10,429 $6,247 $52.67 $89.25
Base Cost1 Cost for each Add. 100 Sq. Ft.1,2
City of Cupertino, CA
Resolution 26-XXX
Fee Effective July 1, 2026
Schedule D - Table 1 Plan Check and Inspection Fees
Related IBC
Class
Building Use
(e.g., IBC Occupancy Type) Sq. Ft. Permit Tech
Cost
Plan Check
Cost
Inspection
Cost
Plan Check
CostInspection Cost
Base Cost1 Cost for each Add. 100 Sq. Ft.1,2
5,000 $399 $12,009 $8,925 $56.88 $68.11
10,000 $532 $14,853 $12,197 $148.53 $127.29
M Mercantile 2,000 $399 $8,849 $7,437 $31.60 $31.02 10,000 $798 $11,377 $9,520 $31.60 $32.72
20,000 $798 $14,537 $12,792 $25.28 $1.99
40,000 $1,196 $19,593 $12,792 $5.79 $8.92
100,000 $1,196 $23,069 $18,147 $5.69 $7.54
200,000 $1,595 $28,758 $25,287 $14.38 $13.44
M M Occupancy Tenant Improvements 300 $266 $3,792 $4,165 $79.00 $146.11 1,500 $532 $4,740 $5,652 $105.34 $119.00
3,000 $532 $6,320 $7,437 $73.74 $8.86
6,000 $798 $8,532 $7,437 $17.56 $36.36
15,000 $798 $10,113 $10,710 $14.75 $27.56
30,000 $1,064 $12,325 $14,577 $41.08 $52.14
R-1 Residential—Hotels & Motels 3,000 $399 $10,429 $8,627 $23.70 $25.64 15,000 $798 $13,273 $11,305 $25.28 $23.80
30,000 $798 $17,065 $14,875 $20.01 $1.33
60,000 $1,196 $23,069 $14,875 $4.21 $6.94
150,000 $1,196 $26,862 $21,122 $4.42 $5.82
300,000 $1,595 $33,498 $29,452 $11.17 $10.35
R-2 Residential—Apartment Building 800 $266 $8,216 $6,842 $69.13 $73.39 4,000 $532 $10,429 $8,925 $79.00 $66.94
8,000 $532 $13,589 $11,602 $59.25 $3.32
16,000 $798 $18,329 $11,602 $13.17 $19.83
40,000 $798 $21,489 $16,362 $13.43 $17.03
80,000 $1,064 $26,862 $22,907 $33.58 $29.96
R-2 Residential—Apartment Building 800 $266 $316 $6,842 $0.00 $73.39 - Repeat Unit 4,000 $532 $316 $8,925 $0.00 $66.94 8,000 $532 $316 $11,602 $0.00 $3.32
16,000 $798 $316 $11,602 $1.32 $19.83
40,000 $798 $632 $16,362 $0.00 $17.03
80,000 $1,064 $632 $22,907 $0.79 $29.96
R-3 Dwellings—Custom Homes, Models, 1,000 $266 $6,004 $7,140 $21.07 $59.50 First Master Plan 2,500 $266 $6,320 $8,032 $84.27 $59.50 4,000 $266 $7,584 $8,925 $15.80 $87.67
6,000 $532 $7,900 $10,412 $63.20 $29.75
8,000 $532 $9,165 $11,007 $15.80 $87.67
10,000 $798 $9,481 $12,495 $94.81 $132.92
R-3 Dwellings—Production Phase 1,000 $133 $632 $5,057 $0.00 $127.86 of Master Plan (Repeats) 2,500 $266 $632 $6,842 $21.07 $138.83 4,000 $266 $948 $8,925 $15.80 $13.29
6,000 $532 $1,264 $8,925 $15.80 $193.37
8,000 $532 $1,580 $12,792 $15.80 $251.29
10,000 $798 $1,896 $17,552 $18.96 $183.50
R-3 Group Care 1,000 $266 $6,952 $6,842 $47.40 $66.15 5,000 $532 $8,849 $9,222 $50.56 $53.55
10,000 $532 $11,377 $11,900 $41.08 $2.66
20,000 $798 $15,485 $11,900 $8.43 $16.86
50,000 $798 $18,013 $16,957 $8.85 $13.62
100,000 $1,064 $22,437 $23,502 $22.44 $24.57
R R Occupancy Tenant Improvements 80 $266 $2,844 $3,867 $197.51 $371.87 400 $266 $3,476 $5,057 $237.01 $371.87
800 $266 $4,424 $6,545 $197.51 $33.23
1,600 $532 $6,004 $6,545 $39.50 $123.96
4,000 $532 $6,952 $9,520 $47.40 $88.46
8,000 $798 $8,849 $12,792 $110.61 $169.87
S Storage 600 $266 $5,372 $4,760 $65.84 $73.06 3,000 $532 $6,952 $6,247 $63.20 $69.42
6,000 $532 $8,849 $8,330 $52.67 $4.43
12,000 $798 $12,009 $8,330 $10.53 $19.83
30,000 $798 $13,905 $11,900 $11.59 $15.76
60,000 $1,064 $17,381 $16,362 $28.97 $29.04
S S Occupancy Tenant Improvements 600 $266 $4,424 $4,462 $52.67 $73.06 3,000 $532 $5,688 $5,950 $52.67 $69.42
6,000 $532 $7,268 $8,032 $42.14 $4.43
12,000 $798 $9,797 $8,032 $8.78 $18.18
30,000 $798 $11,377 $11,305 $9.48 $15.76
60,000 $1,064 $14,221 $15,767 $23.70 $28.05
U Accessory 40
200
City of Cupertino, CA
Resolution 26-XXX
Fee Effective July 1, 2026
Schedule D - Table 1 Plan Check and Inspection Fees
Related IBC
Class
Building Use
(e.g., IBC Occupancy Type) Sq. Ft. Permit Tech
Cost
Plan Check
Cost
Inspection
Cost
Plan Check
CostInspection Cost
Base Cost1 Cost for each Add. 100 Sq. Ft.1,2
400
800
1,000 $266 $2,528 $4,165 $31.60 $191.79
2,000 $399 $2,844 $5,950 $47.40 $125.64
4,000 $532 $3,792 $8,330 $94.81 $221.54
Standard Comm. Foundation 500 $266 $3,160 $4,462 $31.60 $87.67 w/o Podium 2,500 $532 $3,792 $5,950 $50.56 $71.40 5,000 $532 $5,056 $7,735 $37.92 $5.32
10,000 $798 $6,952 $7,735 $6.32 $21.82
25,000 $798 $7,900 $11,007 $7.58 $17.72
50,000 $1,064 $9,797 $15,172 $19.59 $32.47
Standard Comm. Foundation 500 $266 $3,476 $4,760 $47.40 $87.67 with Podium 2,500 $532 $4,424 $6,247 $50.56 $83.30 5,000 $532 $5,688 $8,330 $37.92 $5.32
10,000 $798 $7,584 $8,330 $8.43 $23.80
25,000 $798 $8,849 $11,900 $8.85 $18.91
50,000 $1,064 $11,061 $16,362 $22.12 $34.85
All Shell Buildings 500 $266 $3,792 $4,165 $47.40 $87.67 2,500 $532 $4,740 $5,652 $63.20 $71.40
5,000 $532 $6,320 $7,437 $44.24 $5.32
10,000 $798 $8,532 $7,437 $10.53 $21.82
25,000 $798 $10,113 $10,710 $8.85 $16.53
50,000 $1,064 $12,325 $14,577 $24.65 $31.28
1 At Building Permit submittal, a Planning Division Review fee of 20% shall be collected (see Table 3 - Misc. Items) 2 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold.
FEE DESCRIPTION Unit FY 2026-27
Proposed Fee
MECHANICAL FEES
Mechanical Permit Fee Each $303
Stand Alone Mechanical Plan Check (hourly rate) Each $303 Other Mechanical Inspections (hourly rate) Each $303
MECHANICAL UNIT FEES:
Install or relocate HVAC system or portion there of
Residential Each $297
Commercial Each $447
Hood installation that is served by mechanical exhaust, including the ducts for such hood
Residential Each $150
Commercial Each $595
Any other piece of equipment or appliance not listed in Mechanical schedule.Each $297 Electrical Permit Fee Each $303
Electrical Plan Check Each $303
Electrical Inspections Each $303
ELECTRICAL UNIT FEES:
Residential Whole-House Rewire (up to 2500 sq ft) Each $595 Each Additional 1000 sq ft Each 1,000 sf $297
Receptacle, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters
First 20 First 20 $99
Each Additional Each $10
Lighting fixtures, sockets, or other lamp-holding devices First 20 First 20 $150
Each Additional Each $10
Pole or platform-mounted lighting fixtures Each $34
CITY OF CUPERTINO, CA
Resolution 26-XXX
Fees Effective July 1, 2026
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees
ELECTRICAL FEES
FEE DESCRIPTION Unit FY 2026-27
Proposed Fee
CITY OF CUPERTINO, CA
Resolution 26-XXX
Fees Effective July 1, 2026
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees Appliances (Install / Repair / Replace)
Residential Each $50
Commercial Each $98
Power Apparatus - Generator/Transformer or Similar (Install/Repair/Replace) Residential Each $297
Commercial Each $447
Services (including Temporary Power)
600 volts or less, up to 200 amperes in rating Each $99 600 volts or less, 201 to 1000 amperes in rating Each $297 Over 600 volts or over 1000 amperes in rating Each $447 Any other Electrical apparatus, conduits, and conductors not listed in Electrical Schedule. Each $297
PLUMBING/GAS FEES
Plumbing/Gas Permit Fee Each $303
Stand Alone Plumbing Plan Check Each $303
Other Plumbing and Gas Inspections Each $303
PLUMBING/GAS UNIT FEES:
Residential Whole-House Re-Plumbing (up to 2500 sq ft) Each $595 Each Additional 1000 sq ft Each 1,000 sf $297
Building sewer lateral (Install / Repair / Replace)
Residential Each $74
Commercial Each $150
Sewer Clean-out (Install/Repair/Replace)
Residential Each $74
Commercial Each $150
Building Drain/Waste/Vent Repair
Residential Each $21
Commercial Each $30
Water Heater Replacement / Installation - All Types
Residential Each $74
Commercial Each $223
Interceptors - Grease/Sand (Install/Repair/Replace) Each $223 FEE DESCRIPTION Unit FY 2026-27
Proposed Fee
CITY OF CUPERTINO, CA
Resolution 26-XXX
Fees Effective July 1, 2026
Schedule D - Table 2 Mechanical, Electrical & Plumbing Fees Water Treatment System (Install/Repair/Replace) Each $99 Gas piping (Install/Repair/Replace) Each 4 $150
Install or Replace Water Meter / Service Each $74
Partial Water Re-pipe
Residential Per fixture $30
Commercial Per fixture $20
Any other device/fixture not listed in Plumbing Schedule (Install/Repair/Replace) Each $150 Work Item Unit FY 2026-27 Proposed Fee
Standard Hourly Rate - Building Per hour $303
Accessibility Hardship Exemption Each $316
Acoustical Review
Single Family Home/Duplex—New Each $746
Single Family Home/Duplex—Addition/Alteration Each $439 Multi-Family/Commercial Each $746
Additions (Non Hillside R3 Occupancy) - Plan Check Fees Plan Check Fees (up to 250 sq. ft.) Each $2,794
Plan Check Fees (251 - 499 sq. ft.) Each $5,322
Plan Check Fees (500-999 sq. ft.) Each $6,586
Additions (Non Hillside R3 Occupancy) - Inspection Fees Inspection Fees (up to 250 sq. ft.) Each $3,570
Inspection Fees (251 - 499 sq. ft.) Each $4,760
Inspection Fees (500-999 sq. ft.) Each $5,950
Accessory Buildings - Residential
Accessory Buildings (Up to 499 sq. ft.) Each $1,954
Accessory Buildings (500 - 999 sq. ft.) Each $2,866
Accessory Dwelling Unit (ADU) - Plan Check Fees
Plan Check Fees (up to 499 sq. ft.) Each $2,795
Plan Check Fees (500 - 999 sq. ft.) Each $4,058
Accessory Dwelling Unit (ADU) - Inspection Fees
Inspection Fees (up to 499 sq. ft.) Each $2,975
Inspection Fees (500 - 999 sq. ft.) Each $4,164
Address Assignment Per hour $266
Board of Appeals Per hour $303
Clerical Fee 1/2 hour $133
Alternate Materials and Methods of Construction Per hour $291 Antenna—Telecom Facility
Radio Each $521
Cellular/Mobile Phone, alterations to existing facility Each $746 Cellular/Mobile Phone, free-standing Each $2,587
Cellular/Mobile Phone, attached to building Each $1,360 Arbor/Trellis Each $746
Awning/Canopy (supported by building) Each $746
Balcony Addition Each $1,809
Battery Energy Storage System up to three (3) $746
Each Additional Each $439
CITY OF CUPERTINO, CA
Resolution 26-XXX
Fees Effective July 1, 2026
Schedule D - Table 3 Miscellaneous Items
Work Item Unit FY 2026-27 Proposed Fee
CITY OF CUPERTINO, CA
Resolution 26-XXX
Fees Effective July 1, 2026
Schedule D - Table 3 Miscellaneous Items
Below Market Rate
Escrow Inspection % of Sale Price 0.52%
Carport Each $1,044
Certifications
Special Inspector Qualifications (initial review) Each $583 Special Inspector Qualifications (renewal / update) Each $266 Chimney (new) Each $1,044
Chimney Repair Each $589
Commercial Coach (per unit) Each $1,360
Covered Porch Each $1,044
Deck (wood) Each $1,044
Deck Railing Each $589
Deferred Submittal (2 hour minimum) Each $303
Demolition
Multi-Family and Commercial (up to 3,000 sf) Base $880
Multi-Family and Commercial (each additional 3,000 sf) Each 3,000 sf $306 Residential (R-3 Occ) (up to 3,000 sf) Base $880
Residential (R-3 Occ) (each additional 3,000 sf) Each 3,000 sf $306 Swimming Pool Residential Each $589
Swimming Pool Multi-Family and Commercial (up to 3,000 sf) Base $886 Swimming Pool Multi-Family and Commercial (each additional 3,000 sf) Each 3,000 sf $297 Disabled Access Compliance Inspection Per hour $303
Door
New door (non structural) Each $439
New door (structural shear wall/masonry) Each $746
Duplicate / Replacement Job Card Each $133
Electric Vehicle Charging Station Each $303
Extensions
Plan Check Applications (within 180 days of Submittal) 1 hour $303 Permits (within 180 days of Issuance)
Start construction, without plans 1/2 hour $158
Resume or complete construction, without plans 1/2 hour $158 Start construction, with plans 1 hour $316
Resume or complete construction, with plans 2 hours $632 Work Item Unit FY 2026-27 Proposed Fee
CITY OF CUPERTINO, CA
Resolution 26-XXX
Fees Effective July 1, 2026
Schedule D - Table 3 Miscellaneous Items
Fence
Non-masonry, over 7 feet in height Up to 100 l.f. $589
Non-masonry, each additional 100 l.f. Each 100 l.f. $150 Masonry, over 7 feet in height Up to 100 l.f. $1,044
Masonry, each additional 100 l.f. Each 100 l.f. $595
Fireplace
Masonry each $1,044
Pre-Fabricated/Metal each $589
Flag pole (over 20 feet in height) each $589
Foundation Repair each $1,342
Inspections
Pre-Inspection Fee Per hour $303
Standard Inspection Hourly Rate Per hour $303
Progress Inspection Per hour $303
Partial Inspection Per hour $303
Courtesy Inspection - 2 hour minimum Per hour $303
Cancelled inspection w/out advance notice Per hour $303 Reinspection Per hour $303
Outside of normal business hours (2 hour minimum) Per hour $351 Inspection Supplemental Fee (Projects that require more inspections than average, the Building Official may charge additional inspection fees) First 1/2 hour minimum First 1/2 hour $150
Each Additional hour Per hour $297
Lighting pole Each $746
each additional pole Each $306
Modular Structures Each $1,062
Modification of Technical Code 1 hour $303
Occupancy
Certificate of Occupancy/Completion Each $589
Temporary Occupancy Permit Per six months $589
Partition—Commercial, Interior (up to 30 l.f.) Up to 30 l.f. $895 Additional partition Each 30 l.f. $297
Partition—Residential, Interior (up to 30 l.f.) Up to 30 l.f. $589 Additional partition Each 30 l.f. $297
Work Item Unit FY 2026-27 Proposed Fee
CITY OF CUPERTINO, CA
Resolution 26-XXX
Fees Effective July 1, 2026
Schedule D - Table 3 Miscellaneous Items
Patio Cover / Gazebo
Wood frame Up to 300 sf $1,062
Metal frame Up to 300 sf $1,062
Other frame Up to 300 sf $1,062
Additional patio Each 300 sf $456
Enclosed prefabricated Sun Room Up to 300 sf $1,044
Photovoltaic System
Residential
Systems up to 15kW Each $450
Each Additional kW Above 15kW Each Addl kW $15
Multi-Family and Commercial:
Systems up to 50kW up to 8 kW Each $1,000
Multi-Family Res/Commercial, each additional 1 kilowatt Each 1 addl kW $7 Each Additional kW Above 250kW Each addl kW $5
Thermal System
Residential:
Systems up to 10kW Each $450
Each Additional kW Above 10kW Each addl kW $15
Multi-Family and Commercial:
Systems up to 30kW Each $1,000
Each Additional kW between 30kW and 260kW Each addl kW $7 Each Additional kW Above 260kW Each addl kW $5
Pile Foundation
Cast in Place Concrete (first 10 piles) Up to 10 $1,360 Additional Piles (increments of 10) Each 10 $912
Driven (steel, pre-stressed concrete) Up to 10 $1,360
Additional Piles (increments of 10) Each 10 $912
Product Review Per hour $291
Plan Review
Standard Plan Review Hourly Rate Per hour $316
Overtime Plan Review (2 hour minimum) Per hour $370
Pre-Submittal Plan Review (2 hour minimum) Per hour $316 Expedited Plan Review Each 1.5x Plan Check Fee
Plan Review Supplemental Fee (after 2nd review)
First 1/2 hour minimum First 1/2 hour $317
Pre-Construction Meeting Each $513
Work Item Unit FY 2026-27 Proposed Fee
CITY OF CUPERTINO, CA
Resolution 26-XXX
Fees Effective July 1, 2026
Schedule D - Table 3 Miscellaneous Items
Remodel—Residential
Kitchen (up to 300 sq. ft.) Each $1,184
Bath (up to 300 sq. ft.) Each $1,184
Other Remodel (up to 300 sq. ft.) Each $1,044
Additional remodel (per sq. ft. above 300) Per s.f. $2.60 Other Remodel (1000 sq. ft.) Each $2,866
Additional remodel (per sq. ft. above 1000) Per s.f. $0.61 Other Remodel (2500+ sq. ft.) Each $3,777
Additional remodel (per sq. ft. above 2500) Per s.f. $0.30 Re-roof
Residential (maximum $500 per building) Each 100 sf $28 Multi-Family Dwelling (maximum $500 per building) Each 100 sf $28 Commercial
Commercial (first 5,000 sf) Each $728
Commercial (each additional 2,500 sf) Each 2,500 sf $297 Retaining Wall (concrete or masonry)
Standard (up to 50 l.f.) Up to 50 l.f. $1,360
Additional retaining wall Each 50 l.f. $912
Special Design, 3-10' high (up to 50 l.f.) Up to 50 l.f. $1,974 Additional retaining wall Each 50 l.f. $1,209
Special Design, over 10' high (up to 50 l.f.) Up to 50 l.f. $2,271 Additional retaining wall Each 50 l.f. $1,506
Gravity/Crib Wall, 0-10' high (up to 50 l.f.) Up to 50 l.f. $1,974 Additional Gravity/Crib Wall Each 50 l.f. $1,209
Gravity/Crib Wall, over 10' high (up to 50 l.f.) Up to 50 l.f. $2,271 Additional Gravity/Crib Wall Each 50 l.f. $1,506
Revisions $303
Sauna—steam Each $1,044
Siding
Stone and Brick Veneer (interior or exterior) Up to 400 sf $728 All Other Up to 400 sf $578
Additional siding Each 400 sf $150
Work Item Unit FY 2026-27 Proposed Fee
CITY OF CUPERTINO, CA
Resolution 26-XXX
Fees Effective July 1, 2026
Schedule D - Table 3 Miscellaneous Items
Signs
Directional Each $589
Each additional Directional Sign Each $306
Ground/Roof/Projecting Signs Each $589
Master Plan Sign Check Each $589
Rework of any existing Ground Sign Each $589
Other Sign Each $589
Reinspection Fee Each $141
Wall/Awning Sign, Non-Electric Each $439
Wall/Awning Sign, Electric Each $589
Skylight
50 sf or less (cumulative area) Each $589
Greater than 50 sf or structural Each $306
Stairs—First Flight First flight $589
Each additional flight Per flight $306
Storage Racks
0-8' high (up to 100 l.f.) First 100 l.f. $746
each additional 100 l.f. Each 100 l.f. $150
over 8' high (up to 100 l.f.) First 100 l.f. $895
each additional 100 l.f. Each 100 l.f. $150
Stucco Applications
Base Up to 400 sf $578
Additional Stucco Application Each 400 sf $150
Swimming Pool/Spa
Vinyl-lined Each $1,360
Fiberglass Each $1,360
Gunite (up to 800 sf) Each $1,954
Additional pool (over 800 sf) Each 100 sf $456
Commercial pool (up to 800 sf) Each $3,315
Additional pool (over 800 sf) Each 100 sf $912
Spa or Hot Tub (Pre-fabricated) Each $589
Technology Fee Per Permit 5.8%
Temporary Structures Each $895
Tenant Improvement Preparation Each $589
Window or Sliding Glass Door
Replacement (first 8 windows) First 8 $431
Replacement (each additional 8 windows) Each 8 $150
New Window (non structural) Each $369
Work Item Unit FY 2026-27 Proposed Fee
CITY OF CUPERTINO, CA
Resolution 26-XXX
Fees Effective July 1, 2026
Schedule D - Table 3 Miscellaneous Items
New window (structural shear wall/masonry) Each $521
Bay Window (structural) Each $521
Planning Department Review fee (New Construction and Additions) (Payable at permit submittal) Each 20% of plan review and
inspection fees
Planning Hourly Rate (Misc Reviews) Per hour Refer to Schedule C Housing Mitigation In-lieu fees (Payable at Building Permit issuance) Per sq. ft. Refer to Schedule C Zoning, Planning, Municipal Code fees (Payable at Building Permit issuance) Per sq. ft. Refer to Schedule C Wireless Master Plan fee (Payable at Building Permit issuance) Each Refer to Schedule C Refunds - Plan Check Fees
1st review not started (within 3 Business of Submittal) 100% of Plan Review Fees Plan review more than 3 Business Days after the Date of Submittal No refund Refunds - Building Permit Fees
No inspections and permit is active (not expired) 80% of permit fees No inspections and permit is expired No refund
Inspections were provided No refund
Work without permit - based on current permit and plan check fees Double fees NOTE:
Fees identified in this Table consist of 50% Plan Review Fee and 50% Inspection Fee Fee Adjustments: In instances where the strict application of fees from this schedule would constitute a substantial inequity to an applicant or to the City, the Chief Building Official shall be authorized to adjust such fees on a case-by-case basis. Any such adjustments shall be recorded in writing and entered into the appropriate files.