AVAILABILITY OF PUBLIC RECORDS:

All public record to an open session item on this agenda, which are not exempt from disclosure pursuant to the California Public Records Act, that are distributed to a majority of the legislative body will be available for public inspection at the City Clerk’s Office, City Hall located at 333 90 th Street, Daly City, CA during normal business hours, at the same time that the public records are distributed or made available to the legislative body.

CITY OF DALY CITY

Regular Meeting - CITY COUNCIL

AGENDA

Monday, June 9, 2025 - 7:00 PM

City Hall Council Chambers – 2nd Floor
City Hall 333 – 90th Street
Daly City, CA 94015

To watch the live telecast:
https://www.youtube.com/@DalyCityGov/streams, https://www.dalycity.org/agendas, or Comcast Ch. 27

PUBLIC PARTICIPATION
There are three ways to submit public comments: (1) submit written comments by meeting day, (2) submit written comments during the meeting, and (3) attend the meeting in person.

1. To submit written comments by meeting day, please email [email protected] and include “Public Comment” in the subject line. All written comments received by 4:00 pm on meeting day will be provided to the City Council prior to the meeting.

Please note: Any emailed comments received after 4:00 p.m. on the meeting date are not guaranteed to be received by the City Council prior to the meeting. Comments are not read aloud into the record.

2. During the meeting, you may visit www.dalycity.org/agendas to submit comments using the Public Comment form to address the City Council on a specific item, or during the public comment period, and such comments are delivered to the City Council and City Staff during the meeting, and may be read into the record at the time they are received.

3. To speak at the meeting in person, please complete a Speaker Card located at the entrance to the Council Chamber and submit it to a Staff Member as early in the meeting as possible.

Persons with disabilities who require auxiliary aids or services in attending or participating in this meeting should call the office of the City Clerk at (650) 991-8078 as soon as possible.

Page 1 of 147 ends

Agenda – City Council
Monday, June 9, 2025

Page 2 ends

CALL TO ORDER
The City of Daly City acknowledges that we are on the ancestral lands of the Ramaytush (rah- my-toosh) Ohlone (O-lon-ee) peoples. We recognize their enduring connection to this region and honor their history, culture, and contributions. As the Indigenous protectors of this land, we affirm their sovereign rights as the original inhabitants of this land and pay respects to the Ancestors, Elders, and Relatives of the Ramaytush Ohlone peoples.

PLEDGE TO THE FLAG:

ROLL CALL:

PRESENTATIONS:

1. Proclamation: Pride Month

APPROVAL OF MINUTES:

2. Special Meeting of May 27, 2025

APPROVAL OF AGENDA:

3. Regular Meeting of June 9, 2025

ORAL COMMENT:

NOTE: Speakers are limited to two minutes, unless modified by the Mayor. The Council cannot take action on any matter raised under this item.

CONSENT AGENDA
All items listed on the Consent Agenda are considered to be routine and may be approved by one roll call vote of the City Council. There shall be no separate discussion of the matters on the Consent Agenda unless requested by a member of the City Council. If discussion is required, that item will be removed from the Consent Agenda and will be considered separately at the end of the Agenda.

Resolutions:

4. Adopt MTC Transit Oriented Communities (TOC) Grant Resolution

5. Approve Addendum to Final Environmental Impact Report for the Vista Grande Drainage Basin Improvement Project; Approval of Modified Project

6. Set Time and Place for a Public Hearing to Consider a Zone Change ZC 04-24-16507 - Amendments to the Zoning Map Rezoning Parcels to be included in the existing -CC Commercial Cannabis Combining District (Set Time: 6/23/25)

7. Approve Application of Section 108 Loan Program for Financing Early Learning Center

Page 2 of 147 ends

Agenda – City Council
Monday, June 9, 2025

Page 3 ends

8. Set Time and Place of Public Hearing – Proposed Ordinance Amending Daly City Municipal Code Chapter 5.104 Re: Commercial Cannabis Regulations (Set Time: 6/23/25)

9. Adopt Comprehensive Biennial Operating and Capital Budgets for Fiscal Year 2026 and Fiscal Year 2027

10. Re-Appointment of Daly City Bicycle-Pedestrian Advisory Committee Members

11. Authorize Application to the Housing Incentive Pool Grant Program for the John Daly Boulevard Pedestrian and Bicycle Facility Improvements Project

END OF CONSENT AGENDA

PUBLIC HEARINGS:

12. Public Hearing - Notice of Lien and Special Assessment to Rental Property

STAFF: Tim Nevin

RECOMMENDATION: Open/Close Hearing
Adopt Resolution by Roll Call Vote

13. Introduction of Ordinance Adding Chapter 15.32.280 of Title 15 of the Daly City Municipal Code Re: Fire Hazard Severity Zones

STAFF: Craig Wittner

RECOMMENDATION: Open/Close Hearing
Motion for City Attorney to Read by Title Only
Councilmember Introduce Ordinance

APPOINTMENTS: Board/Commission Membership Committee Appointments

REPORTS:

14. Council Committee

15. City Council

16. Staff

ADJOURNMENT:

Page 3 of 147 ends

Proclamation
PRIDE MONTH JUNE 2025
WHEREAS, the City of Daly City recognizes and proclaims the month of June 2025 as “Pride Month” throughout Daly City; and
WHEREAS,the City of Daly City observes Pride Month annually with a flag raising ceremony to honor the history of the LGBTQ+ liberation movement and proudly raises the Progress Pride Flag for the fourth year in a row; and
WHEREAS, Pride Month is a time to honor the history, celebrate the achievements, and reaffirm the rights of the LGBTQ+ community, whose resilience, courage, and contributions have strengthened the fabric of our society; and WHEREAS, we acknowledge the profound impact that LGBTQ+ individuals have had on our communities, culture, and country—advancing progress in civil rights, education, business, healthcare, the arts, public service, and beyond; and WHEREAS,despite significant advances, LGBTQ+ people continue to face discrimination, violence, and unequal treatment under the law, underscoring the urgent need for continued advocacy, allyship, and legal protections; and WHEREAS,Pride Month is an opportunity to uplift voices too often marginalized, to recognize the intersectionality of race, gender identity, sexual orientation, and ability, and to celebrate the diversity that makes our communities stronger; and WHEREAS,as an inclusive and welcoming City, Daly City remains committed to supporting visibility, dignity, and equality for LGBTQ+ people to enhance the diversity of our community.

NOW, THEREFORE, I, Dr. Roderick Daus-Magbual, Mayor, and members of the City Council of Daly City hereby proclaim June 2025 as PRIDE MONTH, in the City of Daly City in support of the LGBTQ+ community, and we reaffirm our commitment to building a world where everyone—regardless of who they are or whom they love—can live openly, authentically, and free from fear.

Signed and sealed by the Mayor and
City Council of the City of Daly City this 9th
day of June 2025.

Dr. Roderick Daus-Magbual, Mayor
Glenn R. Sylvester, Vice Mayor
Juslyn C. Manalo, Councilmember
Pamela DiGiovanni, Councilmember
Teresa G. Proaño, Councilmember

Page 4 of 147 ends

CITY OF DALY CITY
MINUTES – SPECIAL MEETING – CITY COUNCIL
MAY 27, 2025
--------------------------------
Note on Public Comments:

To provide public comments, members of the public have the option to- 1) attend in person, 2) email the City Clerk, or 3) submit comments through the public comment portal on the City’s website. Persons with disabilities who require auxiliary aids or services in attending or participating in this meeting are instructed to call the office of the City Clerk at 991-8078 prior to the meeting.

Visit https://www.youtube.com/@DalyCityGov/streams to view the City Council meeting

CALL TO ORDER:

Mayor Daus-Magbual called the regular meeting to order at 7:17 P.M. and read the City’s Land Acknowledgement:

The City of Daly City acknowledges that we are on the ancestral lands of the Ramaytush (rah -my-toosh) Ohlone (O-lon-ee) peoples. We recognize their enduring connection to this region and honor their history, culture, and contributions. As the Indigenous protectors of this land, we affirm their sovereign rights as the original inhabitants of this land and pay respects to the Ancestors, Elders, and Relatives of the Ramaytush Ohlone peoples.

ROLL CALL: Councilmembers Present
Roderick Daus-Magbual, Mayor
Glenn R. Sylvester, Vice Mayor
Pamela DiGiovanni
Juslyn C. Manalo
Teresa G. Proaño

Staff Present
Thomas J. Piccolotti, City Manager
Rose L. Zimmerman, City Attorney
K. Annette Hipona, City Clerk

PRESENTATIONS:

Proclamation: Mental Health Month
(Walter Ng, StarVista Crisis Community Center Manager Engagement Supervisor)

Proclamation: Older Americans Month
(Perla Ibarrientos, Daly City Age-Friendly Task Force)

Proclamation: Jewish American Heritage Month
(Mark Weinberger, President of the Daly City History Guild Museum & Archive)

Gabriella Makstman, Commissioner of the Women’s Commission, thanked the Council for r ecognizing Jewish American Heritage Month and the City for the recent Jewish joy celebration. Gabriella noted the contributions of Jewish Americans and spoke about the rise of antisemitic violence in the country. Gabriella referred to the fatal shooting outside a Jewish Museum which took the lives of two attendees, and requested a City resolution focusing only on local issues and to refrain from taking up international conflicts.

Proclamation: Hepatitis B Awareness Week May 18-25, 2025 (Walton Li, TeamHBV San Jose)

Page 5 of 147 ends

CITY OF DALY CITY
MINUTES – SPECIAL MEETING – CITY COUNCIL
MAY 27, 2025
2 FY 2026 and FY 2027 Biennial Operating and Capital Budget (Tim Nevin, Director of Finance and Administrative Services ; Amanda Halbur, Assistant Direct or of Finance and Administrative Services; Joshua Cosgrove, Director of Water and Wastewater Resources; Richard Chiu, Director of Public Works)

APPROVAL OF MINUTES:

Regular Meeting of May 12, 2025

It was moved by Councilmember Manalo, seconded by Councilmember Proaño and carried to approve the minutes of May 12, 2025, as amended.

APPROVAL OF AGENDA:

It was moved by Councilmember Manalo, seconded by Councilmember DiGiovanni and carried to approve the agenda.

CONSENT AGENDA:

It was moved by Councilmember DiGiovanni, seconded by Councilmember Proaño and carried to approve the consent agenda.

Resolutions:

Set Time and Place of Public Hearing – Proposed Ordinance Adding Chapter 15.23.280 to the Daly City Municipal Code Re: Adopting the Fire Hazard Severity Zones (FHSZ) for the Local Responsibility Area (LRA) within the City of Daly City (Set Time: 6/9/25)

Resolution 25-76, Setting Time And Place Of Public Hearing For Proposed Ordinance Adopting The Fire Hazard Severity Zones For The Local Responsibility Area Within The City Of Daly City

Approve FY 2026 Intent to Adopt Appropriations Limitation (Gann Limit)

Resolution 25-77, To Adopt Its Appropriations Limitation For The Fiscal Year 2025-2026 On June 23, 2025

Authorize the Police Department to Execute Agreements to Upgrade Police Radio Infrastructure and Equipment and Appropriate $1,013,500

Resolution 25-78, Authorizing Execution Of Agreements To Upgrade Police Radio Infrastructure And Equipment And Appropriate Funds

Check Registers

Check Register for the Month of Apr 2025

END OF CONSENT OF AGENDA

Page 6 of 147 ends

CITY OF DALY CITY
MINUTES – SPECIAL MEETING – CITY COUNCIL
MAY 27, 2025
3 PUBLIC HEARINGS:

Compliance with New Legal Obligations Re: Public Hearing on City of Daly City Vacancies and Recruitment and Retention Efforts (Assembly Bill 2561/Government Code Section 3502.3)

Director of Human Resources Natalie Sakkal presented the status of the City’s vacancies in recruitment and retention efforts in FY 25 as mandated by AB 2561. Sakkal provided information on the workforce, vacancies by bargaining units, the hiring process, obstacles in the hiring process and options to address these obstacles, classifications above 20% vacancy rates and the efforts for recruitment in those classifications, and retention statistics. Sakkal addressed questions on whether public education to schools can be done for the Police Department, and when the new law (AB 2561) came into effect.

It was moved by Councilmember Manalo, seconded by Councilmember DiGiovanni and carried to open the hearing. There were no public comments.

It was moved by Councilmember Sylvester , seconded by Councilmember Manalo and carried to close the hearing.

It was moved by Councilmember Manalo , seconded by Councilmember DiGiovanni and carried by unanimous roll call vote to adopt the resolution.

Resolution 25-79, In Compliance With New Legal Obligations (Assembly Bill 2561/Government Code Section 3502.3) On City Of Daly City Vacancies And Recruitment And Retention Efforts

City’s HUD Consolidated One-Year Action Plan for Fiscal Year 2025-26

Housing Manager Lenelle Suliguin provided the staff report on recommended funding allocations for CDBG and HOME funds and highlighted the priorities for the upcoming year. Staff addressed questions on the following: the current condition of the housing on El Camino Real ; the programs that have been recommended for FY 25-26; the organizations that applied for funding during the fiscal year; whether short- term rentals are affecting the amount of affordable housing; the likelihood of receiving these federal funds; and a report on short-term rentals including number of units, who is responsible for monitoring those units and the related TOT tax.

It was moved by Councilmember Manalo, seconded by Councilmember Proaño and carried to open the hearing.

Laura Fanucchi, HIP Housing Director, spoke about the organization’s new Housing Readiness Program to help seniors navigate the complex housing resources by providing case management and support. Laura thanked the Council for the opportunity to apply for funding through CDBG.

Melanie Faure, Upwards Community Impact Manager, thanked the City and staff for their funding recommendation and shared how their boost program helps strengthen Daly City’s childcare providers who are in most urgent need of support. Upwards helps childcare provide rs by providing mentorship, a free childcare management software system, and hiring teaching assistants.

Carlos Reyes, Renaissance Entrepreneurship Center Program Manager, expressed appreciation for the CDBG funding to help Renaissance support small businesses in Daly City. Renaissance offers

Page 7 of 147 ends

CITY OF DALY CITY
MINUTES – SPECIAL MEETING – CITY COUNCIL
MAY 27, 2025
4 workshops, classes, and one-on-one counseling for small business owners and aspiring entrepreneurs. In addition to hosting conferences and network events, Renaissance ha s partnered with Daly City Libraries and Recreation to host sessions for entrepreneurs as well as providing vendor opportunities at City events.

It was moved by Councilmember Manalo, seconded by Councilmember Proaño and carried to close the hearing.

It was moved by Councilmember Manalo, seconded by Councilmember DiGiovanni and carried by unanimous roll call vote to adopt the resolution.

Resolution 25-80, Approving The City’s One-Year Action Plan For Fiscal Year 2025- 2026 (July 1, 2025, Through June 30, 2026)

REPORTS:

Council Committee:

Housing Endowment & Regional Trust (HEART) (Sylvester)
San Mateo County Mosquito & Vector Control District (Sylvester) San Mateo County Pre-Hospital Emergency Medical Services Group (Sylvester) North County Fire Authority (Manalo/Sylvester)
Peninsula Clean Energy (PCE) (Daus-Magbual)

Council

Councilmember Manalo reported attendance at the following: the CAFE Age-Friendly Workshop along with Supervisor Canepa, Jennifer Der, Leilani Ramos, Rheanna Mariano, Tita Perla Ibarrientos, Chair Phyllis Rizzi, and Councilmembers Proaño and DiGiovanni, where Manalo presented on behalf of the Age Friendly Task Force Daly City; the 169
th anniversary of San Mateo County and unveiling ceremony for 500 County Center, along with Mayor Daus-Magbual and his son; the grand opening of Midway Village (Phase I) and Phase II groundbreaking in the Bayshore, the largest affordable housing in the County with 555 units, with a keynote by Mayor Daus -Magbual; the Council of Cities with Vice Mayor Sylvester in San Mateo County’s Police Department where the real-time center technology for law enforcement was discussed; the Shine! event at Gellert Park, recognizing Pacific Islands Together (PIT) leader Reyna Poti-Meafua; the Para Sa Komunidad fair at South San Francisco High School highlighting the community’s Filipino vendors; the ICSC Summit to promote and discuss economic development, along with Economic Community Development Specialist Manio; the Jewish American Heritage Month event along with all the Daly City Councilmembers, acknowledging Commissioner Makstman; the Lights of Hope program to raise cancer awareness, thanking Director Brown and advocate Janet Alvarado for their work; the PBRC’s Installation of Officers, along with Vice Mayor Sylvester and his wife and community members ; and the Myanmar community’s Thingyan, the Burmese New Year celebration in the Newark area, along with Supervisor Canepa, Consul General Valenzuela, Personnel Board Member Bayudan, Skyline College students, and Councilmember Manalo’s daughter, Juselle. Manalo participated in the USC Mental Health Awareness ice bucket challenge to support mental health awareness; she was tagged by Councilmember Davis (Brisbane), and tagged Mayor Flores of South San Francisco and Mayor Medina of San Bruno. Manalo thanked staff for ensuring the flags were at half-staff at City Hall in honor of Memorial Day. Manalo spoke about the partnership between Asian Pacific Islander Legal Outreach and Daly City to provide pro bono legal services and legal support for the community at the City’s War Memorial Center and thanked staff for their support.

Page 8 of 147 ends

CITY OF DALY CITY
MINUTES – SPECIAL MEETING – CITY COUNCIL
MAY 27, 2025
5 Councilmember Proaño reported attendance at the following: the Wildfire Awareness event at Arden Park, Southern Hills and thanked the Fire and Police departments for their work on the event ; the Memorial Day Tribute along with Councilmember DiGiovanni, thanking City Manager Piccolotti for the event and the departments for their participation ; the Westmoor and Jefferson High School scholarship awards ceremony, acknowledging the local businesses for their help; and Pollicita School’s awards night, along with Assistant to the City Manager Ramos. Proaño recognized all the students for their achievements.

Mayor Daus-Magbual reported attendance at the following: the FoodieLand f estival at the Cow Palace along with his children, thanking all the vendors for their participation; and the Filipino graduation this past Saturday, where the Mayor was the keynote speaker. Dr. Daus -Magbual will also provide the keynote speech for the Asian American graduation on June 4th at UC Riverside, the Mayor’s alma mater.

The Mayor noted the City’s upcoming Children’s Day Celebration on June 7 from 11AM-2PM at Gellert Park. Dr. Daus-Magbual congratulated the 2025 graduates, with a special acknowledgement to those who graduated from S an Francisco State and Skyline College. Dr. Daus -Magbual recognized Pulitzer-Prize- winning writer and immigrant rights advocate Jose Antonio Vargas, who presented an honorary doctorate to mutual friend Dr. Dawn Mabalon.

ADJOURNMENT:

Mayor Daus-Magbual adjourned the meeting at 11:03 PM in memory of Freddie Aguilar, Sarah Milgrim, Yaron Lischinsky, Su Wan Wong, Jennifer Buensalido Labajo, and Dennis O. Manalo.

Approved as submitted, this 9th
City Clerk
day of June , 2025.

Roderick Daus-Magbual
Mayor

Page 9 of 147 ends

City Council Meeting Agenda ReportItem # _____
Meeting Date: June 9, 2025
Subject: MTC Transit Oriented Communities (TOC) Grant Resolution Recommendation
Adopt a resolution committing the City to take steps toward achieving compliance with the Metropolitan Transportation Commission’s (MTC’s) Transit-Oriented Communities (TOC) Policy as a Condition for MTC to allocate regional discretionary funding to the Housing Policy Development Project (Multi-jurisdictional Grand Nexus and Feasibility Study).

Background
In 2022, the Metropolitan Transportation Commission (MTC) adopted the Transit-Oriented Communities (TOC) Policy to support the region’s transit investments by creating communities around transit stations and along transit corridors that not only enable transit ridership, but also are places where Bay Area residents of all abilities, income levels, and racial and ethnic backgrounds can live, work, and access services. TOC Policy applies to locations within a half mile of existing and planned stops and stations served by Bay Area transit systems including BART, Caltrain, Muni and VTA light rail stations, and bus rapid transit stops. Daly City’s TOC area includes the one-half mile radius around the Daly City and Colma BART stations.

TOC Policy requirements for local jurisdictions include minimum residential and commercial office densities for new developments, adoption of affordable housing production, preservation, and protection policies as well as requirements for stabilizing businesses to prevent displacement.

Additional requirements for parking management and transit station access are also applicable.

Compliance with the TOC policy requirements is necessary for cities to be eligible for transportation funding, including One Bay Area Grant (OBAG) funding cycles. The City has received $3,050,000 in OBAG funding since 2013. The funds have been used for streetscape improvements, street resurfacing and slurry seals, and street safety improvements. The process for cities to confirm compliance with TOC Policy will continue on a rolling basis until an anticipated deadline in early 2026 corresponding with the OBAG 4 funding timeframe.

In October of 2024 MTC announced its grant program which allocated $60 Million in planning and capital grants to provide support to cities to achieve compliance with TOC Policy. $20 Million was set aside for grants to cities for planning and implementation of specific TOC elements such as the adoption of TOC compliant zoning amendments, housing policies, parking management, and planning for station access and circulation. MTC made approximately $2 million available for one- time grants to jurisdictions specifically to support the development and adoption of TOC-compliant housing policies.

Page 10 of 147 ends

City Council Agenda Report
MTC Transit -Oriented Grant Resolution June 9, 2025

Page 2 of 3 ends

Discussion
City staff, working in conjunction with 21 Elements and the Cities of Belmont, Brisbane, Menlo Park, Redwood City, San Bruno, and San Mateo prepared a multijurisdictional application for MTC funding. In November of 2024, the City of Belmont served as the lead agency and submitted the application on behalf of the cities for a multi-jurisdictional housing fee nexus and inclusionary housing policy study, referred to as the Grand Nexus and Feasibility Study, to be led by 21 Elements.

Daly City committed to completing an update to our housing nexus fees and inclusionary housing policy in our adopted Housing Element. Although the joint study will cover topics relevant to all participating jurisdictions, it will also consider each jurisdiction’s unique needs and unique housing requirements.

MTC provided official notification in March that the joint application was awarded $500,000 in grant funds. The grant funding will offset a substantial portion of the consultant cost of the Grand Nexus and Feasibility Study. The County of San Mateo, in coordination with 21 Elements, will act as the contracting entity on behalf of the participating jurisdictions. The County will manage the contract payments and Belmont staff will coordinate with them as fiscal agent for the grant to manage reimbursements for the portion of the contract that is covered by the grant award. The specific share of the grant funds that will be directly attributable to Daly City will be determined once the Request for Proposals process is complete and the exact amount of the consultant contract is determined.

To accept the multi-jurisdictional grant award, the City and each participating jurisdiction are required to adopt a resolution, included in Attachment A. The resolution states that the City intends to adopt relevant policy updates emerging from the work completed through the study grant to comply with the TOC Housing Policy requirements.

Summary/Conclusion
Staff recommends that the Council adopt the attached resolution. Staff is currently reviewing other TOC policies as it relates to density and affordable housing and will be keep the Council abreast of its work. OBAG funding is critical for providing funds to meet the City’s transportation infrastructure needs.

Respectfully submitted,

Lenelle Suliguin Tatum Mothershead
Housing Manager Director, Community Development

Page 11 of 147 ends

City Council Agenda Report
MTC Transit -Oriented Grant Resolution June 9, 2025

Page 3 of 3 ends

Attachments
Draft Resolution

Page 12 of 147 ends

RESOLUTION NO. [XX-XX]
Resolution of The City Council of Daly City Committing to Take Steps Toward Achieving Compliance with The Metropolitan Transportation Commission’s (MTC's) Transit-Oriented Communities (TOC) Policy as a Condition for MTC to Allocate Regional Discretionary Funding to the Housing Policy Development Project (Multi-jurisdictional Grand Nexus and Feasibility Study) WHEREAS, the MTC adopted Resolution 4530, the TOC Policy; and WHEREAS, the TOC Policy incentivizes local jurisdictions to plan and zone for higher residential and commercial densities in areas within one half-mile of existing and planned fixed-guideway transit stops and stations to support the region’s transit investments and implement key GHG reduction strategies from Plan Bay Area 2050; and
WHEREAS, incentivizing local jurisdictions to also adopt policies focused on increasing housing production of all types, particularly affordable housing production, preservation and protection, commercial anti-displacement and stabilization, parking management, and transit station access and circulation further supports regional transit investments and Plan Bay Area 2050 implementation; and WHEREAS, in 2023 MTC identified Colma BART as a Tier 2 TOC and Daly City BART as a Tier 2 TOC in Daly City; and
WHEREAS, MTC conditions the allocation of regional discretionary funding for fixed- guideway transit extension projects on compliance with the TOC Policy; and WHEREAS, MTC anticipates that future regional funding, such as the One Bay Area Grant (OBAG) program, will consider compliance with the TOC Policy as part of the prioritization and project selection process starting with OBAG 4, expected in 2026; and
WHEREAS, the TOC Policy establishes different compliance expectations for existing and planned station areas based on the level of transit service; and WHEREAS, the TOC Policy identifies four TOC Policy areas (density, housing affordability, parking, and access/circulation); and
WHEREAS, on September 30, 2024 the MTC announced a Call for Projects for Transit Oriented Communities (TOC) Planning and Implementation Grants, and informed local jurisdictions of a November 22, 2024 deadline for submittals of Applications, as well as grant application guidance and requirements including compliance with the Transit Oriented Communities Policy; and

Page 13 of 147 ends

RESOLVED, that The City of Belmont submitted a grant application to MTC for $620,000 for the Multi-jurisdictional Grand Nexus and Feasibility Study in the Housing Policy Development (Production) area in response to the MTC’s Call for TOC Planning and Implementation Projects; and
RESOLVED, that The City of Belmont accepted a grant award from MTC for $500,000 for the Multi-jurisdictional Grand Nexus and Feasibility Study in response to the MTC’s Call for TOC Planning and Implementation Projects; and RESOLVED, that Daly City intends to work cooperatively with The City of Belmont and other cities on the Multi-jurisdictional Grand Nexus Study, with partial funding provided by the grant award from MTC; and
RESOLVED, that Daly City commits to completing the city’s tasks associated with the Multi-jurisdictional Grand Nexus and Feasibility Study work scope following an MTC grant award by applying for these funds; and
RESOLVED, that Daly City intends to adopt relevant policy updates emerging from the work completed through the Multi-jurisdictional Grand Nexus and Feasibility Study grant to comply with the TOC Housing Policy Development requirements.

Page 14 of 147 ends

City Council Meeting Agenda ReportItem # _____
props
Meeting Date: June 9, 2025
Subject: Approve Addendum to Final Environmental Impact Report for the Vista Grande Drainage Basin Improvement Project; Approval of Modified Project Recommended Action
Approval of Addendum to Final Environmental Impact Report; and Approval of the Modified Project identified as refinements to the Vista Grande Drainage Basin Improvement Project.

Background
The Vista Grande storm drain system drains the northwestern portion of Daly City and an unincorporated portion of San Mateo County – areas originally within the watershed of Lake Merced. In the 1890’s, the Vista Grande Canal and Tunnel were built to divert storm water away from the lake to an outlet at the Pacific Ocean. The Ocean Outlet and a portion of the Tunnel are located within Fort Funston, part of the Golden Gate National Recreation Area (GGNRA), which is operated under the authority of the National Parks Service (NPS).

The existing Canal and Tunnel do not have adequate hydraulic capacity to convey peak storm flows, and this periodically causes backup of Tunnel flows into the Canal and flooding during peak storm events in adjacent low-lying residential areas and along John Muir Drive.

Daly City developed the Vista Grande Drainage Basin Improvement Project (Project) to address the deficiencies of the basin as outlined above. The City, as Lead Agency under the California Environmental Quality Act (CEQA), and the NPS, as Lead Agency under the National Environmental Policy Act (NEPA), prepared a joint Environmental Impact Report and Environmental Impact Statement (EIR/EIS) for the proposed Project (State Clearinghouse No. 2013032001). City Council certified the EIR/EIS and approved the Project on December 11, 2017.

Subsequent to Project approval and certification of the EIR/EIS, additional Project refinements were necessary to address permit conditions and changes to construction staging areas, among other things. These refinements are described below as the Modified Project.

Discussion
The Modified Project would include the following updates:
•Changing the Canal staging areas and components
•Installing a water recirculation pump
•Adding habitat restoration sites around Lake Merced
•Using the Pacific Rod and Gun Club as a work area
•Revising the Fort Funston work area
•Updating the power source for construction activities
•Using ventilation fans during work in the Tunnel
•Removing wing walls from the final design of the Ocean Outlet at Funston Beach Under the Modified Project, sites along the Canal that were part of the overall Project footprint but were not likely to be disturbed would be used as a staging area for work on the Canal. The Modified Project would add staging areas adjacent to the Canal between the rehabilitated Lake Merced Portal and Wetland Cell B, with a footprint of 1.24 acres.

Page 15 of 147 ends

City Council Agenda Report
Subject: Approve Addendum to Final Environmental Impact Report for the Vista Grande Drainage Basin Improvement Project; Approval of Modified Project Meeting Date: June 9, 2025

Page 2 of 3 ends

The Modified Project includes a water recirculation pump that would draw water from South Lake into the treatment wetlands. The pump would be installed underground, several feet from the bank of South Lake to pump water through the pipeline from South Lake into the diversion structure, then into the treatment wetland.

The EIR/EIS included compensatory mitigation for impacts on regulated aquatic resources for affected arroyo willow riparian and freshwater marsh (wetland) habitat. The California Coastal Commission (Coastal Commission) has regulatory authority over coastal wetlands and environmentally sensitive habitat areas (ESHAs) in the coastal zone. Much of the shoreline vegetation at Lake Merced was identified as an ESHA during the Project’s review by the Coastal Commission for its Coastal Development Permit. As a condition of approval in the Project’s Coastal Development Permit, the Coastal Commission indicated that the Project must compensate for the loss of ESHA and coastal wetlands due to the operational increase of Lake Merced’s water surface elevation. The Coastal Commission concluded that these specific types of habitat losses were not offset by the predicted passive expansion of aquatic habitats from Project operations raising the water surface elevation. To address the Coastal Development Permit condition of approval, 10 acres of on-site habitat restoration have been added to the Project.

Since the certification of the EIR/EIS, Daly City and the San Francisco Public Utilities Commission (SFPUC) have discussed temporary use of the portions of the site previously known as the Pacific Rod and Gun Club. Under the Modified Project, the Pacific Rod and Gun Club would be used as an additional work area (approximately 1.17 acres in size and would be used for 6 months).

Additionally, under the Modified Project, the Fort Funston work area would be reduced to 2.5 acres, 1.5 acres smaller than originally estimated.

After certification of the EIR/EIS, Daly City determined that the use of a temporary Pacific Gas & Electric (PG&E) service connection would not be feasible. Under the Modified Project, construction activities would be powered by seven additional generators ranging from 80 to 200 horsepower (hp). The generators would use diesel fuel and operate 24 hours a day, 5 days a week, until tunneling is complete. The generators would be located within the Tunnel’s rehabilitated east portal work area and the modified Fort Funston tunnel and shaft work area.

Under the Modified Project, the contractor would use two temporary ventilation fans for the Tunnel construction activities. These ventilation fans would circulate air within the Tunnel during the underground Tunnel construction activities. Each ventilation fan would contain a 100 hp motor powered by seven additional generators ranging from 80 to 200 hp.

The design of the proposed Ocean Outlet structure, including the wing walls, considered the effects of sea level rise on both the operation of the outlet and the rate of cliff erosion. However, the Coastal Commission concluded that the two wing walls were not permittable as part of Project design. Thus, under the Modified Project, the wing walls would be removed from the final design of the Ocean Outlet.

For more detail, please see Section 2.2, Modifications to the Project in the Addendum (Attachment A).

Page 16 of 147 ends

City Council Agenda Report
Subject: Approve Addendum to Final Environmental Impact Report for the Vista Grande Drainage Basin Improvement Project; Approval of Modified Project Meeting Date: June 9, 2025

Page 3 of 3 ends

Environmental Assessment
In accordance with CEQA, Daly City prepared an Addendum to the EIR/EIS to evaluate whether environmental impacts associated with the Modified Project would require additional CEQA compliance such as a subsequent EIR/EIS.

The Addendum concludes that the Modified Project would not result in any new significant impacts not previously disclosed in the EIR/EIS, and it would not result in a substantial increase in the magnitude of any significant environmental impact previously identified. Additionally, there is no new information that shows that the mitigation measures previously found not to be feasible would in fact be feasible, or that mitigation measures or alternatives considerably different from those analyzed in the previous EIR/EIS would substantially reduce one or more significant effects on the environment. The Modified Project would also be subject to the mitigation measures already adopted as part of the mitigation monitoring and reporting program. Therefore, an addendum to the EIR/EIS is sufficient to meet the requirements of CEQA Guidelines Section 15164. The Addendum to the EIR/EIS serves as documentation that the Modified Project does not trigger any of the conditions outlined in CEQA Guidelines Section 15162 that would require a subsequent EIR/EIS.

Therefore, a subsequent EIR/EIS is not required.

In considering approval of the Modified Project, City Council must first determine that the Addendum has been completed in compliance with CEQA, that the Council has reviewed and considered the information contained in the Addendum, and that the Addendum reflects the City’s independent judgement and analysis. If it determines that each of these is correct, should the Council desire to approve the Modified Project, it should affirm that the Addendum is compliant with CEQA.

Fiscal Impact
Filing of a Notice of Determination with the County of San Mateo will be $50. (There is no California Department of Fish & Wildlife filing fee with subsequent CEQA documents.) Staff is available to answer any questions of the City Council members.

Respectfully submitted,
Joshua Cosgrove
Director of Water and Wastewater Resources
Attachment A – Addendum to the EIR/EIS

Page 17 of 147 ends

VISTA GRANDE DRAINAGE BASIN IMPROVEMENT

PROJECT EIR/EIS
Environmental Impact Report /
Environmental Impact Statement Addendum
State clearinghouse NO. 2013032001

Prepared for June 2025
City of Daly City
National Park Service

Page 18 of 147 ends
Page 19 of 147 ends

VISTA GRANDE DRAINAGE BASIN IMPROVEMENT

PROJECT EIR/EIS
Environmental Impact Report /
Environmental Impact Statement Addendum
State clearinghouse NO. 2013032001
Prepared for June 2025
City of Daly City
National Park Service
575 Market Street
Suite 3700
San Francisco, CA 94105
415.896.5900
esassoc.com
Bend
Irvine
Los Angeles
Mobile
Oakland
Orlando
Palm Beach County
Pasadena
Pensacola
Petaluma
Portland
Rancho Cucamonga
Sacramento
San Diego
San Francisco
San Jose
Santa Barbara
Sarasota
Seattle
Tampa
Thousand Oaks

Page 20 of 147 ends

OUR COMMITMENT TO SUSTAINABILITY | ESA helps a variety of public and private sector clients plan and prepare for climate change and emerging regulations that limit GHG emissions. ESA is a registered assessor with the California Climate Action Registry, a Climate Leader, and founding reporter for the Climate Registry. ESA is also a corporate member of the U.S. Green Building Council and the Business Council on Climate Change (BC3). Internally, ESA has adopted a Sustainability Vision and Policy Statement and a plan to reduce waste and energy within our operations. This document was produced using recycled paper.

Page 21 of 147 ends

Vista Grande Drainage Basin Improvement Project i ESA / D200700036.01 EIR/EIS Addendum June 2025

TABLE OF CONTENTS
Vista Grande Drainage Basin Improvement
Project EIR/EIS Addendum
Page
Acronyms and Other Abbreviations ................................................................................... iii Section 1. Background and Purpose of the Addendum ................................................. 1-1

1.1 Background ....................................................................................................... 1-1

1.2 Summary of Past Analysis ................................................................................. 1-1

1.3 Purpose of the Addendum ................................................................................. 1-2

1.4 Determination and Addendum Conclusion ........................................................ 1-3 Section 2. Project Description .......................................................................................... 2-1

2.1 Prior Project Description .................................................................................... 2-1

2.2 Proposed Modifications to the Project ............................................................... 2-3 Section 3. Discussion of Impacts ..................................................................................... 3-1

3.1 Aesthetics .......................................................................................................... 3-3

3.2 Air Quality .......................................................................................................... 3-6

3.3 Biological Resources ....................................................................................... 3-11

3.4 Cultural Resources .......................................................................................... 3-16

3.5 Geology and Soils ............................................................................................ 3-18

3.6 Greenhouse Gas Emissions and Climate Change........................................... 3-20

3.7 Hydrology and Water Quality ........................................................................... 3-23

3.8 Noise and Vibration ......................................................................................... 3-27

3.9 Recreation ....................................................................................................... 3-31

3.10 Energy Conservation ....................................................................................... 3-33 Section 4. References and Report Preparers .................................................................. 4-1

4.1 References ........................................................................................................ 4-1

4.2 Lead Agency ...................................................................................................... 4-3

4.3 Consultant ......................................................................................................... 4-3 List of Figures
Figure 2-1 Modified Project Components (Canal) ............................................................ 2-5 Figure 2-2 Habitat Restoration Sites ................................................................................ 2-6 Figure 2-3 Pacific Rod and Gun Club Work Area........................................................... 2-10 Figure 2-4a Original Fort Funston Work Area .................................................................. 2-12 Figure 2-4b Modified Fort Funston Work Area ................................................................. 2-13 Figure 2-5a Original Ocean Outlet Construction Area ...................................................... 2-15 Figure 2-5b Modified Ocean Outlet Design ...................................................................... 2-18

Page 22 of 147 ends

Table of Contents

Page
Vista Grande Drainage Basin Improvement Project ii ESA / D200700036.01 EIR/EIS Addendum June 2025
List of Tables
Table 2-1 Restoration Site Locations and Areas (acres) ................................................ 2-8 Table 3-1 Construction Criteria Pollutant Exhaust Emissions ......................................... 3-7 Table 3-2 Estimated Project Construction Greenhouse Gas Emissions ....................... 3-21 Table 3-3 Typical Noise Levels Produced By Construction Equipment ........................ 3-28

Page 23 of 147 ends

Acronyms and Other Abbreviations

Vista Grande Drainage Basin Improvement Project iii ESA / D200700036.01 EIR/EIS Addendum June 2025
Acronyms and Other Abbreviations
BAAQMD Bay Area Air Quality Management District
Bay Area San Francisco Bay Area
BMP best management practice
Canal Vista Grande Canal
CEQA California Environmental Quality Act
CO2e carbon dioxide equivalent
Coastal Commission California Coastal Commission
dBA A-weighted decibels
DPM diesel particulate matter
District North San Mateo County Sanitation District
EIR environmental impact report
EIS environmental impact statement
ESHA environmentally sensitive habitat area
GHG greenhouse gas
hp horsepower
lb/day pounds per day
Ldn day-night average sound level
Modified Project minor revisions and additions to the Vista Grande Drainage Basin Improvement Project that have
occurred since Project approval
NOx oxides of nitrogen
NPS National Park Service
PG&E Pacific Gas and Electric Company
PM2.5 particulate matter 2.5 micrometers or less in diameter PM10 particulate matter 10 micrometers or less in diameter Project Vista Grande Drainage Basin Improvement Project ROG reactive organic gases
SFDPW San Francisco Department of Public Works
SFPUC San Francisco Public Utilities Commission
TAC toxic air contaminant
Tunnel Vista Grande Tunnel
WSE water surface elevation

Page 24 of 147 ends

Acronyms and Other Abbreviations
Vista Grande Drainage Basin Improvement Project iv ESA / D200700036.01 EIR/EIS Addendum June 2025

This page intentionally left blank

Page 25 of 147 ends

Vista Grande Drainage Basin Improvement Project 1-1 ESA / D200700036.01 EIR/EIS Addendum June 2025
SECTION 1
Background and Purpose of the Addendum

1.1 Background
This environmental impact report/environmental impact statement (EIR/EIS) addendum has been prepared to address minor revisions and additions to the Vista Grande Drainage Basin Improvement Project (Project). The North San Mateo County Sanitation District (District)—a subsidiary of the City of Daly City, the lead agency responsible for administering the environmental review of the Project under the California Environmental Quality Act (CEQA)— and the National Park Service (NPS), the lead agency under the National Environmental Policy Act, completed an EIR/EIS (State Clearinghouse No. 2013032001) for the Project. The EIR/EIS addresses storm-related flooding that currently occurs in the Vista Grande Drainage Basin and proposes to provide other environmental benefits, including the restoration and management of water levels in Lake Merced.

This addendum describes minor revisions and additions (Modified Project) that have occurred since Project approval, reviews CEQA requirements for preparing an addendum, and substantiates the finding that the Modified Project would not result in new or more severe environmental impacts than previously disclosed in the EIR/EIS.

1.2 Summary of Past Analysis

1.2.1 Draft EIR/EIS
The Draft EIR/EIS, published on April 28, 2016, described the Project, identified the environmental consequences associated with the Project’s implementation, and specified mitigation measures to reduce significant and potentially significant impacts. The NPS Notice of Availability for the Draft EIR/EIS was published in the Federal Register on April 29, 2016.

1.2.2 Final EIR/EIS
The Final EIR/EIS, published on September 8, 2017, consisted of the Draft EIR/EIS and the response to comments document. The Final EIR/EIS was also published in the Federal Register on September 15, 2017.

1.2.3 Notice of Determination/Record of Decision
The City of Daly City certified the EIR/EIS, adopted CEQA findings, and implemented a mitigation monitoring and reporting program on December 11, 2017. Daly City filed the Notice of

Page 26 of 147 ends

1. Background and Purpose of the Addendum

Vista Grande Drainage Basin Improvement Project 1-2 ESA / D200700036.01 EIR/EIS Addendum June 2025
Determination with San Mateo County on December 13, 2017. A Record of Determination was adopted by the NPS on July 27, 2018.

All the documents described above are herein incorporated by reference.

1.3 Purpose of the Addendum
The CEQA Guidelines (Sections 15162 and 15164) allow a lead agency to prepare an addendum to a previously certified EIR if some changes or additions to the environmental evaluation of a project are necessary, and the following conditions are met:

1. There are no substantial changes in the project which require major revisions to the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.

2. There are no substantial changes with respect to the circumstances under which the project is undertaken which require major revisions to the previous EIR due to involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.

3. No new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, which shows any of the following:
a. The project will have one or more significant effects not discussed in the previous EIR. b. Significant effects previously examined will be substantially more severe than disclosed in the previous EIR.
c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative. d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

The District proposes to make the following modifications to the Project:
• Changing the Vista Grande Canal (Canal) staging areas and components. • Installing a water recirculation pump.
• Adding habitat restoration sites around Lake Merced.
• Using the Pacific Rod and Gun Club as a work area.
• Revising the Fort Funston work area.
• Updating the power source to be used during construction activities. • Using ventilation fans during work in the Vista Grande Tunnel (Tunnel). • Removing the wing walls from the final design of the Ocean Outlet at Funston Beach.

See Section 2.1, Prior Project Description, for a full description of the Project.

Page 27 of 147 ends

1. Background and Purpose of the Addendum

Vista Grande Drainage Basin Improvement Project 1-3 ESA / D200700036.01 EIR/EIS Addendum June 2025

1.4 Determination and Addendum Conclusion
This addendum concludes that the Modified Project would not result in any new significant impacts not previously disclosed in the EIR/EIS, and it would not result in a substantial increase in the magnitude of any significant environmental impact previously identified. Additionally, there is new information that shows that the mitigation measures previously found not to be feasible would in fact be feasible, or that mitigation measures or alternatives considerably different from those analyzed in the previous EIR/EIS would substantially reduce one or more significant effects on the environment. The Modified Project would also be subject to the mitigation measures already adopted as part of the mitigation monitoring and reporting program. Therefore, an addendum to the EIR/EIS is sufficient to meet the requirements of CEQA Section 15164. The addendum to the EIR/EIS serves as documentation that the Modified Project described in Section 1.3, Purpose of the Addendum, does not trigger any of the conditions outlined in CEQA Guidelines Section 15162 that would require a subsequent EIR/EIS. Therefore, a subsequent EIR/EIS is not required.

Page 28 of 147 ends

1. Background and Purpose of the Addendum

Vista Grande Drainage Basin Improvement Project 1-4 ESA / D200700036.01 EIR/EIS Addendum June 2025

This page intentionally left blank

Page 29 of 147 ends

Vista Grande Drainage Basin Improvement Project 2-1 ESA / D200700036.01 EIR/EIS Addendum June 2025

SECTION 2
Project Description

2.1 Prior Project Description
The following discussion provides a description of the Project construction and operation elements that would be affected by the proposed modifications. Therefore, construction and operation elements that would change under the Modified Project are not discussed further.

2.1.1 Project Location
As described in Section 2.2, Project Location, of the EIR/EIS, the Vista Grande Basin (the watershed that drains into the Canal) is located in Daly City and in unincorporated Broadmoor Village in northwestern San Mateo County. This watershed covers approximately 2.5 square miles and is bordered by San Francisco to the north, the Colma Creek watershed to the south and east, and Thornton State Beach and the Pacific Ocean to the west. The Canal and Tunnel are located primarily within the city and county of San Francisco. The Canal alignment runs adjacent to John Muir Drive and the southwestern shoreline of Lake Merced, with a small portion of the beginning of the Canal situated within unincorporated San Mateo County. The Tunnel extends beneath private lands, Skyline Boulevard, and Fort Funston—a former U.S. Army installation now managed by NPS as part of the Golden Gate National Recreation Area. The Tunnel outlet is located at the Pacific Ocean on Fort Funston Beach.

2.1.2 Project Components
As described in Section 2.4, Proposed Project Components, of the EIR/EIS, the Project would improve stormwater drainage and minimize flooding risk, provide a water source for Lake Merced management, improve recreational access to and reduce litter deposition at the beach below Fort Funston, and maximize the use of existing infrastructure and rights-of-way. The Project would consist of the following:
• Partially replacing the existing Canal to incorporate a gross solid screening device, a constructed treatment wetland, and diversion and discharge structures. These modifications would route some stormwater (and authorized non-stormwater) flows from the Canal to Lake Merced and allow lake water to be used for summer treatment wetland maintenance. The operation would be implemented in accordance with the initial Vista Grande Operational Plan, which is part of the proposed Lake Management Plan. • Modifying the existing effluent gravity pipeline to enable year-round conveyance of treated effluent from the nearby District wastewater treatment plant to the existing outlet and diffuser by gravity, while abandoning the force main pipeline.

Page 30 of 147 ends

2. Project Description

Vista Grande Drainage Basin Improvement Project 2-2 ESA / D200700036.01 EIR/EIS Addendum June 2025
• Modifying the existing lake overflow structure to include an adjustable weir and siphon that allows water from the lake to flow into the Canal and Tunnel. • Replacing the existing Tunnel to expand its hydraulic capacity and extend its operating lifetime and replacing the Lake Merced Portal to the Tunnel. • Replacing the existing Ocean Outlet structure and a portion of the existing 33-inch submarine outfall pipeline that crosses the beach at Fort Funston. • Implementing a prioritized suite of best management practices (BMPs) within the Vista Grande Basin storm drain system upstream of the Canal or within the Lake Merced watershed.

Operational components of the Project, described further below, would include managing the water surface elevation (WSE) in Lake Merced and implementing a Lake Management Plan (see Appendix A of the EIR/EIS).

Additionally, the Project includes NPS execution of a Special Use Permit for construction activities within Golden Gate National Recreation Area lands and the expansion of the rights-of- way to accommodate the replacement of the Ocean Outlet structure.

2.1.3 Project Construction
As discussed in Section 2.5, Project Construction, of the EIR/EIS, the construction phase would require approximately 1,300 kilowatts of electricity, primarily for Tunnel construction activities.

For a conventional tunneling operation, the estimated minimum required power connection is about 3,000 kilovolt-amperes. Temporary construction power would be provided in the staging area at Fort Funston via a temporary Pacific Gas and Electric Company (PG&E) service connection. An emergency power supply (generator) with a capacity of 1,000 kilovolt-amperes would be located on-site during construction.

Staging and work areas would be established for each segment of the Project site to store contractors’ construction equipment and materials (e.g., vehicles, fuels, lubricants). The staging and work areas may also be used to stockpile excavated soil for eventual reuse during construction. Areas of temporary disturbance would be restored to pre-Project conditions or similar. Staging and work areas described in the EIR/EIS include the following:
• Box culvert, diversion structure, and Lake Merced Portal: Staging areas would be adjacent to work areas. Construction and staging areas adjacent to John Muir Drive would be enclosed by chain-link fencing erected along John Muir Drive. These areas have no existing public access.
• Diversion to Impound Lake—John Muir Drive Crossing: An internally braced sheet pile excavation would cross John Muir Drive. Chain-link fencing would be placed around the excavation. Traffic and pedestrian access would be temporarily rerouted around the excavation.
• Shaft staging and shotcrete installation: The Fort Funston staging area and the area used for shotcrete installation would likely have chain-link fencing around the perimeter. These are the only areas that would be excluded from public use during construction activities.

Page 31 of 147 ends

2. Project Description

Vista Grande Drainage Basin Improvement Project 2-3 ESA / D200700036.01 EIR/EIS Addendum June 2025
• Ocean Outlet: A U-shaped sheet pile cofferdam around the Ocean Outlet structure would form the barrier to exclude the public, including dogs, from the construction area and to isolate the work area from tidal waters. The cofferdam would extend slightly beyond the seaward extent of the existing outlet structure.

As discussed in Section 2.5.5, Tree and Vegetation Removal, of the EIR/EIS, trees would be removed in several areas: adjacent to the Canal to accommodate the Canal improvements, at the wetland treatment cell installation sites, along the portion of the diversion structure on the south side of John Muir Drive, and in Lake Merced Portal’s vicinity. No trees would be removed from NPS-managed lands at Fort Funston. Permitting authority and regulations regarding tree and vegetation removal would vary throughout the site depending on the jurisdiction of the area affected.

2.2 Proposed Modifications to the Project
The Modified Project would include the following updates:
• Changing the Canal staging areas and components.
• Installing a water recirculation pump.
• Adding habitat restoration sites around Lake Merced.
• Using the Pacific Rod and Gun Club as a work area.
• Revising the Fort Funston work area.
• Updating the power source for construction activities. • Using ventilation fans during work in the Tunnel. and • Removing wing walls from the final design of the Ocean Outlet at Funston Beach.

The proposed Modified Project is described in further detail below.

2.2.1 Vista Grande Canal
As discussed in Section 2.4.1, Vista Grande Canal Improvements and Diversion of Stormwater to Lake Merced, and Section 2.5.1, Canal Improvements and Diversion to Lake Merced, of the EIR/EIS, the Project includes replacing the upstream portion of the Canal with a collection box, box culvert, debris screening device, and diversion structure that would enable the diversion of Canal flows into Lake Merced. A constructed treatment wetland would be developed in an area between John Muir Drive and the southern edge of the Canal to handle low flows (dry and wet) year-round. From the diversion structure, a box culvert would be constructed under John Muir Drive and a screened outlet structure would be constructed at the edge of Impound Lake.

Improvements to the Canal components would be constructed from staging areas adjacent to the work areas.

Construction of the Canal improvements, diversion structure/pipeline, and treatment wetland would require site clearing and removal of vegetation in the area bounded by Lake Merced Boulevard, John Muir Drive, and the southern edge of the Canal. In Table 2-1, Summary of

Page 32 of 147 ends

2. Project Description

Vista Grande Drainage Basin Improvement Project 2-4 ESA / D200700036.01 EIR/EIS Addendum June 2025
Construction Requirements for Project Components, of the EIR/EIS, the staging area for the Canal portion is approximately 10 acres, with a final footprint of 4 acres. After completion of construction, staging areas, access routes, and other areas temporarily disturbed during construction would be revegetated with a mix of native, low-growing shrub species common to local riparian corridors and coastal scrub habitats.

Under the Modified Project, sites along the Canal that were part of the overall Project footprint but were not likely to be disturbed would be used as a staging area for work on the Canal. The Modified Project would add staging areas adjacent to the Canal between the rehabilitated Lake Merced Portal and Wetland Cell B, with a footprint of 1.24 acres (see Figure 2-1). Additionally, a permanent access ramp would be installed to access the areas adjacent to the Canal from the rehabilitated Lake Merced Portal, which would provide access for maintenance and service activities.

The additional staging areas may require the installation of temporary chain-link fencing around the perimeter to serve as a buffer and screen from public views; however, the proposed staging areas do not provide public access. The proposed staging areas would be restored to pre-Project conditions after completion of construction activities.

2.2.2 Water Recirculation Pump
As discussed above the treatment wetland would be developed along John Muir Drive to treat year-round low flows from the watershed to reduce sediment, suspended solids, metals, and nutrients. Low-volume stormwater flows, authorized non-storm flows, and recirculated lake water would be treated before release to Lake Merced. The wetland consists of two cells: Wetland Cell A, approximately 1.7 acres in size, and Wetland Cell B, 0.9 acre in size, for a total area of 2.6 acres.

To maximize lake water treatment during summer months, a flexible pipeline approximately 18 inches in diameter would be installed underground between South Lake and Impound Lake, as discussed in EIR/EIS Section 2.4.1.3, Constructed Treatment Wetland. During periods of high algae growth in South Lake, a skimmer—a floating structure with some wind protection that draws water from the upper few inches of the lake surface—would be used to uptake water with high algae concentrations and route it through the treatment wetland via a flexible pipeline.

Although the skimmer and pipeline were discussed in the EIR/EIS, the project description did not identify the need for a water recirculation pump that would draw water from South Lake into the treatment wetlands. The Modified Project includes this pump, which would be installed underground, several feet from the bank of South Lake to pump water through the pipeline from South Lake into the diversion structure, then into the treatment wetland. The location of the proposed water recirculation pump is shown in Figure 2-2.

The Modified Project (i.e., pump at South Lake) would include construction activities similar to those described in the EIR/EIS and would be visible from public roadways. Additionally, the South Lake pump’s construction would involve ground-disturbing activities similar to that described in the EIR/EIS and within the specified geotechnical conditions.

Page 33 of 147 ends

Rehabilitated Lake
Merced Overflow
Existing Canal
Alignment
(No Change)
Wetland
Cell B
Discharge Into
Lake Merced
Diversion
Structure
Wetland
Cell A
Box
Culvert
I m p o u n d
L a k e
S o u t h
L a k e
T h e
O l y m p i c C l u b
G o l f C o u r s e
Collection
Box
Bar Rack
J o h n M u i r D r
San Francisco
Daly City
Existing Erosion
Control (Riprap)
Existing Erosion
Control (Riprap)
Existing Erosion
Control (Riprap)
Rehabilitated Lake
Merced Portal
Permanent
Access Ramp
Water
Recirculation Pump
Additional
Staging Areas
SOURCE: McMillen Jacobs Associates, 2013
0 300
Feet
Vista Grande Drainage Basin Improvement Project 200700036.01 Figure 2-1
Modified Project Components (Canal)
1 inch = 400 feet

Page 34 of 147 ends

S o u t h L a k e
N o r t h L a k e E a s t L a k e
9 11
2 3
1 7
4 14
5 12
10 13
6 8
35 John Muir
Vidal
Gellert
Zoo
alyptus
Sunset
Lakeshore
ClearfieldMorningside
Middlefield
S lvan
en
Everglade
Garces
Ocean
Driveway
Higuera
Harding
Sp g d
Great
Ramp
Lake Merced
Bonnie Brae
Country Club
Armory
Font
Lake Merced
Ocean35
Ramp
Armory
Ramp
Ramp
Lake Merced
Harding
Sunset
Harding
Lake Merced
Path: U:\GIS\GIS\Projects\207xxx\207036.01_Vista_Grande_Drainage_Basin\Bio\CCC\MMP\Habitat Mitigation Sites_overview.mxd,  RHaines  4/9/2025 SOURCE: ESA, 2025.

N
0 200
Feet
Construction Work Limits
Elevation 8.5 ft (SF City Datum)
Habitat Restoration Sites
Vista Grande Drainage Basin Improvement Project 200700036.01 Figure 2-2
Habitat Restoration Sites

Page 35 of 147 ends

2. Project Description

Vista Grande Drainage Basin Improvement Project 2-7 ESA / D200700036.01 EIR/EIS Addendum June 2025

2.2.3 Habitat Restoration Sites
As discussed in Section 3.4.5, Impact Analysis (Biological Resources), of the EIR/EIS, the direct loss of jurisdictional wetlands and waters would have a potentially significant impact. The EIR/EIS included Mitigation Measure 3.4-8b, which requires restoration of temporary disturbance areas to pre-Project conditions, as required by regulatory permits. It would also offset unavoidable permanent impacts on jurisdictional wetlands, waters, and riparian habitat from Project components through compensatory mitigation, helping to ensure no net loss of regulated aquatic resources, as required by regulatory permits.

The EIR/EIS determined that Project operation would not adversely affect wetland habitats and other waters of the United States associated with Lake Merced, as modeling results predicted a net expansion of shoreline wetlands (see EIR/EIS subsection Impacts of Lake Level Changes on Biological Resources at Lake Merced and Mitigation Measures in Section 3.4.5).

The EIR/EIS included Mitigation Measure 3.4-10a and Mitigation Measure 3.4-10b, which would reduce potential impacts on wax myrtle scrub and Vancouver rye grassland resulting from Project implementation to less-than-significant levels. This would be achieved through managing water levels to avoid Project-related losses of sensitive communities or through compensatory mitigation if these losses cannot be avoided. Mitigation Measure 3.4.10a required that the overflow weir at South Lake be set no greater than 9 feet city datum to avoid significant impacts on the sensitive natural (upland) communities of wax myrtle scrub, Vancouver rye grassland, and eucalyptus forest, which would otherwise be lost in significant quantities from inundation under the Project. Mitigation Measure 3.4.10b required monitoring and compensation through habitat restoration for loss of these communities if the lake WSE would exceed 9 feet city datum for more than 14 days. The Modified Project would identify a WSE that would comply with Mitigation Measure 3.4.10a and would incorporate Mitigation Measure 3.4.10b if a future scenario required exceedance of 9 feet WSE for more than 14 days.

The EIR/EIS assumed that compensatory mitigation for impacts on regulated aquatic resources would occur at a minimum 1:1 ratio for affected arroyo willow riparian and freshwater marsh (wetland) habitat. It also assumed that this and any additional compensatory mitigation requirements from regulatory agencies issuing permits and authorizations for the Project would be fulfilled through the predicted passive expansion of open water habitat and freshwater marsh from Project operations raising the WSE, making the Project “self-mitigating.” The regulatory agencies that issued permits and authorizations for the Project in 2022 and 2023 (the U.S. Army Corps of Engineers, San Francisco Bay Regional Water Quality Control Board, and California Department of Fish and Wildlife) accepted the prediction that the passive expansion of open water habitat and freshwater marsh from the Project’s operations raising the WSE would adequately offset the Project’s permanent impacts on aquatic habitats, thus making it “self- mitigating.” The agencies required post-Project monitoring and reporting to verify success.

The California Coastal Commission (Coastal Commission) has regulatory authority over coastal wetlands and environmentally sensitive habitat areas (ESHAs) in the coastal zone. Much of the shoreline vegetation at Lake Merced was identified as an ESHA during the Project’s review by the Coastal Commission for its Coastal Development Permit. As a condition of approval in the

Page 36 of 147 ends

2. Project Description

Vista Grande Drainage Basin Improvement Project 2-8 ESA / D200700036.01 EIR/EIS Addendum June 2025
Project’s Coastal Development Permit, the Coastal Commission indicated that the Project must compensate for the loss of ESHA and coastal wetlands due to the operational increase of Lake Merced’s WSE. The Coastal Commission concluded that these specific types of habitat losses were not offset by the predicted passive expansion of aquatic habitats from Project operations raising the WSE. To address the Coastal Development Permit condition of approval, 10 acres of on-site habitat restoration have been added to the Project. The mitigation sites’ locations and areas are listed in Table 2-1 and depicted in Figure 2-2.

TABLE 2-1

RESTORATION SITE LOCATIONS AND AREAS (ACRES)
Site ID Area (acres) Location
1 0.68 North Lake
2 1.00
3 0.70
4 0.43
5 0.29
6 0.11
7 0.60
8 0.07 South Lake–west shore
9 1.88
10 0.40
11 2.54
12 0.48 South Lake–east shore
13 0.28
14 0.57 East Lake
Tota l* 10.0
NOTE:
* Total is approximate due to rounding.

SOURCE: Data compiled by Environmental Science Associates in 2025

Restoration would include the removal of existing non-native and invasive plant species (including trees), followed by seeding, planting, and installing temporary irrigation. Under the Modified Project, approximately 804 trees around Lake Merced would be removed for the installation of the habitat restoration sites; however, the final number would depend on the final design and acreage of the chosen sites. The trees would consist primarily of blue gum eucalyptus (Eucalyptus globulus) and other non-native species, including myoporum (Myoporum laetum), Monterey cypress (Hesperocyparis macrocarpa), and blackwood acacia (Acacia melanoxylon), with several other native and non-native species in less abundance.

The habitat restoration sites would be planted primarily with native arroyo willow (Salix lasiolepis) trees to expand willow riparian habitat along the Lake Merced shoreline. Freshwater marsh (wetland) plants, including swamp knotweed (Persicaria amphibia) and California bulrush (Schoenoplectus californicus), would be planted at the lower elevations of the mitigation sites near the future operational WSE. Native species associated with coastal scrub habitat, such as

Page 37 of 147 ends

2. Project Description

Vista Grande Drainage Basin Improvement Project 2-9 ESA / D200700036.01 EIR/EIS Addendum June 2025
Pacific wax myrtle (Morella californica), flowering current (Ribes sanguineum var. glutinosum), California sagebrush (Artemisia californica), California blackberry (Rubus ursinus), sticky monkeyflower (Diplacus aurantiacus), and toyon (Heteromeles arbutifolia), would be planted at elevations above the arroyo willow at some sites to create upland fringe habitat. After planting, the willow riparian and coastal scrub habitats would be seeded with a native seed mix of herbaceous understory species.

Restoration plantings would require temporary irrigation during the establishment period of approximately 3 years, sourced from water lines operated by the City and County of San Francisco. The proposed plantings would use approximately 2.5 acre-feet of water per year after initial planting until vegetation is established. Additionally, seeded areas may use up to 3.5 acre- feet of water combined in the months immediately after seeding. The habitat restoration sites may also require the installation of temporary chain-link fencing or other material around the perimeter to serve as a buffer, screen the site from public views, and to discourage herbivory.

2.2.4 Pacific Rod and Gun Club Work Area
As discussed in Section 2.1, Prior Project Description, staging and work areas would be established for each segment of the Project site to store contractors’ construction equipment and materials (e.g., vehicles, fuels, lubricants). The staging and work areas might also be used to stockpile excavated soil for eventual reuse during construction. Areas of temporary disturbance would be restored to pre-Project conditions or similar.

Since the certification of the EIR/EIS, Daly City and the San Francisco Public Utilities Commission (SFPUC) have discussed temporary use of the portions of the site previously known as the Pacific Rod and Gun Club. The Pacific Rod and Gun Club was closed in 2015, as part of SFPUC’s Pacific Rod and Gun Club Upland Soil Remedial Action Project, during which lead and debris- contaminated soils associated with the Pacific Rod and Gun Club’s operation were excavated and backfilled with clean material. The site is currently planned for redevelopment as part of an SFPUC and San Francisco Recreation and Parks Department project known as the Lake Merced West Project, which would redevelop the site into a public park and boat launch (SFPUC 2024).

Under the Modified Project, the Pacific Rod and Gun Club would be used as an additional work area (see Figure 2-3), located at the southeastern corner of the property along John Muir Drive.

The work area would be approximately 1.17 acres in size and would be used for 6 months at a time or until component completion. The site would primarily be used as a work area during the implementation of the compensatory mitigation sites and for the installation of the in-water Project components. Using this site for construction work was not evaluated in the EIR/EIS and would be considered an addition to the Project.

The addition of the site as a construction work area would not require excavation or alteration of the landscape, and areas adjacent to structures within the Pacific Rod and Gun Club site would be avoided. The Pacific Rod and Gun Club work area would be restored to pre-Project conditions or similar after the completion of construction activities through seeding a native grassland seed mix to disturbed areas.

Page 38 of 147 ends

JOHN MUIR DR

THE OLYMPIC CLUB
030 30 60

LIMITS OF DISTURBANCE
Work Area 1.17 acres
SOURCE: Brown and Caldwell, 2024; Google Earth, 2025 Vista Grande Drainage Basin Improvement Project. 200700036.01 Figure 2-3
Pacific Rod and Gun Club Work Area

Page 39 of 147 ends

2. Project Description

Vista Grande Drainage Basin Improvement Project 2-11 ESA / D200700036.01 EIR/EIS Addendum June 2025

2.2.5 Fort Funston Work Area
As discussed in Section 2.5.2, Vista Grande Tunnel and East and West Portals, of the EIR/EIS, the replacement Tunnel component would be constructed from a temporary construction shaft located at Fort Funston, in an approximately 4-acre area that would also be used as a construction work area (see Figure 2-4a). Most construction activities associated with the Tunnel would take place in this area. The work area would include space for loading and unloading trucks, materials and equipment storage, shop facilities, office trailers, and parking. Existing vegetation in this area would be cleared before the initiation of construction activities.

After certification of the EIR/EIS, modifications were made to the Project design. Under the Modified Project, the Fort Funston work area would be reduced to 2.5 acres, 1.5 acres smaller than originally estimated (see Figure 2-4b). The proposed modifications also include a new temporary work area located within the Fort Funston parking lot, 400 feet southwest of the Fort Funston tunnel and shaft work area.

The new work area would be 0.44 acre and would be located in the northwest corner of the Fort Funston parking lot. The work area would be used for concrete fabrication work, with access from Fort Funston Road off Skyline Boulevard. Concrete fabricated at this work area would then be moved to the concrete pump work area to the west, located along the top of the bluffs above the Ocean Outlet location on Funston Beach.

The additional work area may require the installation of temporary chain-link fencing around the perimeter to serve as a buffer and screen the site from public views. After the completion of construction activities, the work areas would be restored to pre-Project conditions or similar, and disturbed areas would be regraded with native soils to match existing profiles. Additionally, the work areas would be revegetated with native coastal dune habitat, including species such as silver dune lupine (Lupinus chamissonis), mock heather scrub (Ericameria ericoides), and ice plant (Carpobrotus edulis).

2.2.6 Use of Diesel Generators
As discussed in Section 2.5.3.4, Construction Power and Emergency Generators, of the EIR/EIS, the electricity demand during construction would be 1,300 kilowatts, required solely for the Tunnel work area. This estimate includes equipment such as a road header or mini excavator, and ancillary equipment consisting of shotcrete application equipment, a batch plant, a compressor, pumps, ventilation fans, water treatment facilities, shop equipment, a warehouse, a change house, yard lighting, and office trailers. Temporary construction power would be provided to the work area at Fort Funston via a temporary PG&E service connection or a portable diesel-powered generator. If a temporary PG&E service connection is used, an emergency power supply (generator) with the capacity of 1,000 kilovolt-amperes would be located on-site during construction.

After certification of the EIR/EIS, Daly City determined that the use of a temporary PG&E service connection would not be feasible. Under the Modified Project, construction activities would be powered by seven additional generators ranging from 80 to 200 horsepower (hp). The generators would use diesel fuel and operate 24 hours a day, 5 days a week, until tunneling is

Page 40 of 147 ends

Rehabilitated Ocean
Outlet Portal
Drainage Tunnel
Rehabilitated Tunnel
Portal
Fort Funston
Existing Ocean
Outlet Removed
Temporary Construction
Shaft Staging Area 4 Acres
Temporary Construction
Shaft Staging Area 4 Acres
ConstructionAccess Road
J o h n M u i r D r
¬«35
SOURCE: McMillen Jacobs Associates, 2013 Vista Grande Drainage Basin Improvement Project 200700036.01 Figure 2-4a
Original Fort Funston Work Area
0 350
Feet
1 inch = 350 feet

Page 41 of 147 ends

CONCRETE PUMPING

STAGING AREA

PROPOSED SHAFT

VISTA GRANDE

DRAINAGE TUNNEL

CONCRETE

STAGING AREA

2.5 ACRES
Vista Grande Drainage Basin Improvement Project 200700036.01 0 350
Feet
1 inch = 350 feet
Figure 2-4b
Modified Fort Funston Work Area
SOURCE: Brown and Caldwell, 2024

TUNNEL AND SHAFT
STAGING AREA J o h n M u i r D r
3¬ 3¬«35
Fort Funston
C nsot ructionAccessRoad
C nso tructionAccessRoad
.44 ACRES

Page 42 of 147 ends

2. Project Description

Vista Grande Drainage Basin Improvement Project 2-14 ESA / D200700036.01 EIR/EIS Addendum June 2025
complete. The generators would be located within the Tunnel’s rehabilitated east portal work area (see Figure 2-1) and the modified Fort Funston tunnel and shaft work area (see Figure 2-4b).

As discussed in Fort Funston Work Area, after the completion of construction activities, the work areas would be restored to pre-Project conditions or similar, and disturbed areas would be regraded with native materials to match existing profiles.

2.2.7 Ventilation at Tunnel Portals
As discussed in Section 2.4.2, Vista Grande Tunnel and East and West Portals, of the EIR/EIS, the existing Tunnel would be enlarged to increase its capacity to match the Canal’s 500 cubic feet per second flow capacity and to extend its operating life by replacing the aging structure. The new Tunnel would have a concrete lining and a final internal diameter of approximately 9 feet.

As discussed in Section 2.5.3, Construction Schedule, Workforce, and Equipment, a temporary 100 hp ventilation fan would be used for air circulation during the Tunnel construction activities and would be located within the Fort Funston tunnel and shaft work area.

Under the Modified Project, the contractor would use two temporary ventilation fans for the Tunnel construction activities. These ventilation fans would circulate air within the Tunnel during the underground Tunnel construction activities. Each ventilation fan would contain a 100 hp motor powered by seven additional generators ranging from 80 to 200 hp (see Use of Diesel Generators above). The ventilation fans and generators would be located within the Tunnel’s rehabilitated east portal work area (see Figure 2-1) and the modified Fort Funston tunnel and shaft work area (see Figure 2-4b).

After tunneling construction activities, all disturbed areas would be restored to pre-Project conditions or similar, and disturbed areas would be regraded with native materials to match existing profiles.

2.2.8 Ocean Outlet Design
As discussed in Section 2.4.2, Vista Grande Tunnel and East and West Portals, of the EIR/EIS, Daly City’s existing Ocean Outlet structure is located on the beach below Fort Funston. This Ocean Outlet structure discharges the Vista Grande Watershed stormwater to the Pacific Ocean either through the submarine outfall pipeline during low flows or across the beach during higher flows. The Ocean Outlet structure, a segment of the Tunnel, and the force main segment are fully exposed to the surf and waves.

The Project would reconfigure these structures to provide protection from the surf and waves, including designing the system to withstand the force of high tides and associated waves. The existing Daly City Ocean Outlet structure would be removed and replaced with a low-profile outlet structure set nearer to the existing cliff face to improve beach access (see Figure 2-5a).

Wing walls would be constructed to the north and south of the rehabilitated Ocean Outlet. To the north, an approximately 70-foot-long wing wall would be constructed from the Ocean Outlet structure to connect to an existing wing wall that extends south from SFPUC’s Lake Merced Sewer tunnel outlet against the cliff face. Additionally, a 100-foot-long wing wall would be constructed to the south of the outlet to protect the cliff face (see Figure 2-5a).

Page 43 of 147 ends

Submarine Outfall Pipe
Concrete Apron
Temporary Sheet Pile
Cofferdam
Area Likely to be
Used from Temporary
Concrete Pump and HoseWing Wall
Regrade With Native
Material to Match Existing
Drainage Tunnel
End Mined Tunnel
Outlet Structure
Wing Wall
0 100
Feet
N
Vista Grande Drainage Basin Improvement Project. 200700036.01 Figure 2-5a
Original Ocean Outlet Construction Area
SOURCE: McMillen-Jacobs Associates, 2019

Page 44 of 147 ends

2. Project Description

Vista Grande Drainage Basin Improvement Project 2-16 ESA / D200700036.01 EIR/EIS Addendum June 2025
This page intentionally left blank

Page 45 of 147 ends

2. Project Description

Vista Grande Drainage Basin Improvement Project 2-17 ESA / D200700036.01 EIR/EIS Addendum June 2025
The design of the proposed Ocean Outlet structure, including the wing walls, considers the effects of sea level rise on both the operation of the outlet and the rate of cliff erosion. However, the Coastal Commission concluded that the two wing walls were not permittable as part of Project design. Thus, under the Modified Project, the wing walls would be removed from the final design of the Ocean Outlet (see Figure 2-5b).

There would also be other small changes to the design elements shown in the EIR/EIS, including additional supports for the anchor outfall pipe. Additionally, the work area for concrete pumping activities and the overall layout of the disturbed area for construction activities at the Ocean Outlet location would move just north of the disturbed area shown in Figure 2-5a (see Figure 2-5b for comparison). Jute netting would be laid on the cliff face to protect it from any disturbance from concrete pumping activities. After the completion of construction at the Ocean Outlet location, excavations would be backfilled and disturbed areas would be regraded with native soils to match existing profiles.

Page 46 of 147 ends

(E) OUTLET

STRUCTURE
(E) BRICK

LINED TUNNEL

LIMITS OF

DISTURBANCE

FORT FUNSTON
REPLACE (E) 33"

SUBMARINE

OUTFALL

TEMPORARY SHEET

PILE COFFERDAM
020 20 40

LIMITS OF DISTURBANCE

LIMITS OF DISTURBANCE

STAGING
AREA
FOR

CONCRETE

PUMPING

ACTIVITIES

JUTE NETTING TO

PROTECT SLOPE

LIMITS OF DISTURBANCE
(E) CCSF

OUTFALL

STRUCTURE
SOURCE: Brown and Caldwell, 2024
NOTES: CCSF = City and County of
San Francisco
Vista Grande Drainage Basin Improvement Project. 200700036.01 Figure 2-5b
Modified Ocean Outlet Design

SUNSET TRAIL

Page 47 of 147 ends

Vista Grande Drainage Basin Improvement Project 3-1 ESA / D200700036.01 EIR/EIS Addendum June 2025
SECTION 3
Discussion of Impacts
This chapter describes modifications to existing environmental conditions that have occurred in and near the Project area, as well as any changes to environmental impacts due to the Modified Project. Although there have been several modifications to the Project since the certification of the EIR/EIS (see Section 2.2, Proposed Modifications to the Project), the overall design and construction details would be similar to those described previously in the certified EIR/EIS.

Therefore, this addendum focuses on site-specific resources that may be affected by the Modified Project.

As discussed in Section 3.1.3, Environmental Topics Removed from Consideration, of the EIR/EIS, agriculture and forestry resources, mineral resources, and public services were not evaluated because there would be no impacts on these resources from the Project. Under the Modified Project, this would not change, as there would be no major changes to the general area where the Project would occur. The environmental conditions and potential impacts relevant to hazards and hazardous materials, land use and planning, geologic and paleontological resources, transportation and traffic, utilities and service systems, and associated cumulative effects would not change as a result of the Modified Project. This includes minor changes to the design, work and staging areas, access routes, and construction activities because the changes would not affect agriculture and forestry resources or mineral resources, and there would be no changes to land use and planning beyond that described in the EIR/EIS. Additionally, there would be no changes to hazards and hazardous materials, geologic and paleontological resources, or utilities and service systems, given that construction work would generally be the same as previously analyzed.

Finally, no changes under the Modified Project would affect transportation and traffic, as the Modified Project would implement a Construction Traffic Management Plan and any other required traffic control measures outlined in Section 3.15, Transportation and Traffic, of the EIR/EIS.

The CEQA Guidelines were revised in 2018 to include wildfire as a new environmental topic in its Appendix G. Although an addendum need not consider revisions to the CEQA Guidelines that occur after EIR certification (CEQA Guidelines Section 15007), this addendum notes for informational purposes that the wildfire environmental topic considers whether a project is in or near state responsibility areas or lands classified as very high fire hazard severity zones. If so, it considers whether the Modified Project would include conditions that would exacerbate wildfire risks. The Project site is not located in a state responsibility area and in areas classified as having either a moderate or a very high fire hazard (CAL FIRE 2024). Furthermore, the Modified Project does not include conditions that could exacerbate existing fire risks, such as the creation of slopes or the addition of infrastructure (e.g., roads, power lines, or fuel breaks). Therefore, construction and operation of the Modified Project would not result in a substantial wildfire impact.

Page 48 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-2 ESA / D200700036.01 EIR/EIS Addendum June 2025
The following sections provide analysis of the environmental impacts provided in the EIR/EIS.

The impacts have been evaluated to disclose any potential changes that would result from the Modified Project’s implementation compared to the certified EIR/EIS and to determine whether these changes would result in new significant environmental effects or a substantial increase in the severity of previously identified significant effects. Based on the analysis provided below, the changes resulting from the Modified Project’s implementation would not result in new significant environmental impacts or a substantial increase in the severity of previously identified significant effects.

The following discussion reviews revisions to the setting information provided in the EIR/EIS, discloses the findings, and discusses potential resulting changes in environmental impacts for each remaining resource area.

Page 49 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-3 ESA / D200700036.01 EIR/EIS Addendum June 2025

3.1 Aesthetics

3.1.1 Setting
The aesthetics setting described in Section 3.2, Aesthetics, of the EIR/EIS remains applicable to the Modified Project. The section provides an overview of existing aesthetic conditions within the San Francisco Bay Area (Bay Area) and around Lake Merced, presents the associated regulatory framework, and analyzes potential impacts that would result from the construction and operation of the facilities proposed under the Project.

3.1.2 Findings of the EIR/EIS
The EIR/EIS analysis identified that less-than-significant impacts with mitigation incorporated related to aesthetics would occur.

3.1.3 Project Change Analysis
Discussion
The Modified Project includes components that could potentially cause additional impacts on aesthetics in the Project area. These components include additional staging areas along the Canal, installation of habitat restoration sites around Lake Merced, and the use of additional work areas at the Pacific Rod and Gun Club and Fort Funston.

As described in Section 3.2.1, Affected Environment, of the EIR/EIS, the study area for aesthetics includes public areas where the Project elements would be visible. The study area includes the Project site, Lake Merced, Fort Funston, and associated open and recreational spaces in the Project site’s vicinity. Lake Merced and adjacent areas are closely bounded by the major thoroughfares of Lake Merced Boulevard, John Muir Drive, and Skyline Boulevard. Aside from golf courses, the Lake Merced area is not highly manicured or landscaped. However, it does not have an untouched natural appearance due to the scattered presence of structures, utilities, roads, and a narrow band of vegetation contained by sidewalks and paths that run alongside the roads surrounding the lake.

The overall Lake Merced area is largely undeveloped, with trees, water, and vegetation providing visual variety and a respite from San Francisco’s urban setting. Because many of the surrounding roadways and neighborhoods are elevated relative to Lake Merced, the lake and the bordering open space are important visual resources, offering aesthetically pleasing views for motorists, bicyclists, and pedestrians. A portion of the 49‐Mile Scenic Drive, a San Francisco designated scenic road tour, partially encircles the lake. It can be reasonably assumed that users of the pedestrian path, in particular, expect a high‐quality environment, given that the streets included in the 49‐Mile Scenic Drive are recognized for their aesthetic value. Thus, these pedestrians, motorists, and bicyclists are considered sensitive viewers when considering the potential for aesthetic impacts. Nevertheless, the Project site currently has low viewer exposure and can be seen only briefly as viewers pass by.

Page 50 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-4 ESA / D200700036.01 EIR/EIS Addendum June 2025
As discussed in Section 3.2.5, Impact Analysis, of the EIR/EIS, the Project would result in temporary construction-related impacts on the visual character of the Project site and surrounding areas. Direct views of the Project site, including views of construction work areas, would occur from public roadways and public areas in residential neighborhoods and outdoor recreational facilities in the area. Construction activities would occur over a 24- to 44-month period or until completion, as described in Section 2.5.3, Construction Schedule, Workforce, and Equipment, of the EIR/EIS.

Under the Modified Project, additional work areas would be at Fort Funston and the Pacific Rod and Gun Club, as well as additional staging areas along the Canal and for the habitat restoration sites. However, there would be no significant changes to the duration of Project construction (24–44 months). The additional Project construction areas would include stockpiling construction materials, storing construction equipment, and temporarily storing construction debris. However, the Modified Project would implement Mitigation Measure 3.2-1, which requires the contractor to keep Project areas clean and inconspicuous and requires the prompt removal of debris.

Construction work and staging areas would be restored to conditions similar to existing conditions following the completion of construction activities, except for permanent changes associated with the Modified Project. The Fort Funston work areas, Pacific Rod and Gun Club work area, additional Canal staging areas, and other unpaved staging areas would be revegetated and restored to pre-Project conditions. Because the aesthetic effects of construction activities would be temporary, construction activities would not result in a substantial adverse impact on a scenic vista or resource, or on the visual character of a site or its surroundings. Therefore, the impact would remain less than significant with mitigation incorporated.

The Modified Project would include up to 14 habitat restoration sites, restoring 10 acres of habitat around Lake Merced. The habitat restoration sites would include construction activities, tree removal around Lake Merced (see Figure 2-2), and temporary irrigation. Approximately 804 additional trees would be removed to accommodate the 10 acres of proposed habitat restoration sites; however, the final number would depend on the final design and acreage of the chosen sites.

Most trees proposed for removal from the habitat restoration sites are non-native, including blue gum eucalyptus, Monterey pine (Pinus radiata), Monterey cypress, and myoporum, among several others in less abundance.

The habitat restoration sites would be planted primarily with arroyo willow and native freshwater marsh plantings at the lower elevations near the banks of Lake Merced. The habitat restoration sites would be designed to reflect and restore the character of the native vegetation communities historically located along the shoreline of Lake Merced. The design character of the habitat restoration sites would integrate the selected areas and associated temporary irrigation infrastructure with the existing visual environment of the Project site. The habitat restoration sites could be considered an aesthetic improvement to the area as they would replace non-native forest with native willow riparian, coastal scrub, and wetland habitat.

The installation of the habitat restoration sites would primarily occur at lower elevations compared to the surrounding roads and the pedestrian path encircling the lake, providing a buffer

Page 51 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-5 ESA / D200700036.01 EIR/EIS Addendum June 2025
to direct views of the habitat restoration sites and construction activities. The habitat restoration sites and associated construction activities would be further screened by existing fencing and vegetation at higher elevations of the lake’s banks along some portions of Skyline Boulevard, John Muir Drive, and Lake Merced Boulevard, which are part of San Francisco’s 49-Mile Scenic Drive. This fencing and vegetation would be retained after the installation of the habitat restoration sites and would continue to screen direct views of the lake from roads and the pedestrian path encircling the lake, similar to existing conditions. Restoration activities would extend up to the roadway and pedestrian path at some sites along Skyline Boulevard and Lake Merced Boulevard, opening up views of the lake where taller nonnative trees would be removed and replace with willow tree species.

Views of the habitat restoration sites and associated construction activities for installation would be visible from the interior of the lake, including direct views from open water areas and users of public recreational facilities along Harding Road. As mentioned previously, the Modified Project would remove up to 804 trees at the 14 chosen habitat restoration sites and would replace non- native forest with riparian, wetland, and coastal scrub habitat. This would enhance the visual landscape of habitat around Lake Merced by restoring it with historical vegetation communities found along its banks. The habitat restoration sites would replace existing non-native habitat, including species such as blue gum eucalyptus, and would take up to 3 years to fully mature.

Once fully established, the habitat restoration sites would add to the existing visual variety of species, both native and non-native, found around Lake Merced. Therefore, the impact on scenic resources would be less than significant.

The Modified Project construction may create a new temporary source of nighttime lighting in the immediate area, and the light and glare effects (including potential effects on nighttime sky viewing) from Project construction could be substantial. Therefore, the impact could be significant. Mitigation Measure 3.4-9, described in Section 3.4, Biological Resources, would require that nighttime illumination be directed downward, helping to ensure that no significant illumination would pass beyond the work area or vertically into the sky. Light deflectors would be erected between traffic and staging areas. Implementation of Mitigation Measure 3.4-9 would help ensure that impacts associated with light and glare are reduced to a less-than-significant level. The operation phase of the Modified Project would not create a new source of light or glare, as no lighting is proposed. Therefore, there would be no impact associated with Modified Project operation.

Conclusion
Implementation of Mitigation Measures 3.2-1 and 3.4-9 included in the EIR/EIS would reduce potentially significant impacts on aesthetic resources to a less-than-significant level. The Modified Project would not result in any new or more severe significant impacts than those identified in the certified EIR/EIS. (Same impact as previously approved project [less than significant with mitigation].)

Page 52 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-6 ESA / D200700036.01 EIR/EIS Addendum June 2025

3.2 Air Quality

3.2.1 Setting
The air quality setting from Section 3.3, Air Quality, of the EIR/EIS remains applicable to the Modified Project. The section provides an overview of existing air quality conditions within the San Francisco Bay Area Air Basin area, presents the associated regulatory framework, and analyzes potential impacts that would result from construction and operation of the facilities proposed under the Project.

3.2.2 Findings of the EIR/EIS
The EIR/EIS identified the potential for less-than-significant impacts with mitigation included related to air quality.

3.2.3 Project Change Analysis
Discussion
The Modified Project includes components that could potentially cause additional impacts on air quality in the Project area. These components include the use of diesel generators to power construction activities, as well as construction activities, including site preparation and ground disturbance in closer proximity to sensitive receptors. This would include the use of additional work and staging areas, the installation of an access ramp near the Canal, the installation of habitat restoration sites around Lake Merced, and the use of the Pacific Rod and Gun Club work area.

As described in Section 3.3.5, Impact Analysis, of the EIR/EIS, most Project-related exhaust emissions would be generated on-site due to the use of the heavy-duty off-road equipment.

Exhaust emissions would also be generated by heavy-duty diesel material haul trucks, concrete vendor trucks, and, to a lesser extent, construction worker daily commute trips. Criteria pollutant exhaust emissions of reactive organic gases (ROG), oxides of nitrogen (NOx), particulate matter 10 micrometers or less in diameter (PM10), and particulate matter 2.5 micrometers or less in diameter (PM2.5) from construction equipment and vehicles would incrementally add to the regional atmospheric loading of these pollutants during Project construction. Impacts related to violating an air quality standard or contributing to an existing or projected air quality violation were assessed by comparing estimated direct and indirect Project exhaust emissions to the significance thresholds, which are average daily emissions of 54 pounds per day (lb/day) for ROG, NOx, and PM2.5, and 82 lb/day for PM10.

Project-related construction criteria for pollutant exhaust emissions discussed in the EIR/EIS are outlined in Table 3-1.

Under the Modified Project, the use of seven generators ranging from 80 to 100 hp would generate an additional 6 lb/day of NOx during the first 6 months and 8 lb/day during the following 12 months, raising daily NOx emissions up to 40.2 lb/day. However, this would be below the Bay Area Air Quality Management District’s (BAAQMD’s) NOx emission threshold of 54 lb/day. The

Page 53 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-7 ESA / D200700036.01 EIR/EIS Addendum June 2025
use of diesel generators would also increase the PM10 emissions by 50 percent, but this would still be below the BAAQMD threshold of 82 lb/day. Using diesel generators for construction activities would be temporary, lasting 18 months. Additionally, if generators are stationary, Daly City would be required to obtain a BAAQMD permit and comply with any BMPs identified.

TABLE 3-1

CONSTRUCTION CRITERIA POLLUTANT EXHAUST EMISSIONS
Emission Source
Average Daily Construction Emissions (pounds/day)
ROG NOx PM10 PM2.5
Construction Activities 4.9 20.0 0.9 0.9
Vehicle Trips 0.7 12.3 0.3 0.2
Average Daily (pounds/day) 5.6 32.2 1.2 1.2
BAAQMD Significance Threshold 54 54 82 54
Significant Impact? No No No No
NOTES:

BAAQMD = Bay Area Air Quality Management District; EIR/EIS = Environmental Impact Report/Environmental Impact Statement; EMFAC = EMission FACtors model; NOx = oxides of nitrogen; PM2.5 = particulate matter 2.5 micrometers or less in diameter ; PM10 = particulate matter 10 micrometers or less in diameter; ROG = reactive organic gases.

Emissions were estimated using emission factors from the off-road emissions inventory database and EMFAC 2011. Numbers may not sum due to rounding. See Appendix C of the EIR/EIS for details on the emissions estimates.

SOURCE: ESA 2017

In addition to exhaust emissions, the Modified Project construction activities would generate fugitive dust emissions associated with site preparation, earth disturbance, travel on paved and unpaved roads, and other dust-generating activities. With regard to fugitive dust emissions, BAAQMD recommends that lead agencies focus on implementing dust control measures to help ensure that impacts would be less than significant, rather than comparing estimated levels of fugitive dust to quantitative significance thresholds.

For all areas of the Modified Project construction within the city and county of San Francisco, Daly City would be required to comply with San Francisco’s construction Dust Ordinance by submitting a Dust Control Plan to the San Francisco Department of Public Health for approval.

The site-specific Dust Control Plan would require Daly City to do the following:
• Water active construction areas sufficiently to prevent dust from becoming airborne. • Provide as much water as necessary to control dust without creating runoff in disturbed areas. • Wet-sweep or vacuum streets, sidewalks, paths, and intersections where work is in progress at the end of the workday.
• Cover inactive stockpiles greater than 10 cubic yards or 500 square feet of material. • Use dust enclosures, curtains, and dust collectors as necessary to control dust in the excavation area.

Daly City also requires that a grading permit applicant submit a Dust Nuisance Control Plan for review and approval. This plan must include both dust suppression through watering or other

Page 54 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-8 ESA / D200700036.01 EIR/EIS Addendum June 2025
techniques and daily sweeping of public streets and sidewalks. Similar to San Francisco requirements, this plan would also represent BMPs identified by BAAQMD for controlling fugitive dust. The Modified Project would also implement Mitigation Measure 3.3-1 to prepare and implement a Dust Control Plan for construction activities at Fort Funston, which is a federally administered area.

Short-term construction exhaust emissions associated with the Modified Project would not exceed the significance thresholds for ozone precursors or particulate matter. Compliance with the San Francisco Construction Dust Ordinance, Daly City’s grading permit Dust Nuisance Control Plan requirements, and Mitigation Measure 3.3-1 would help ensure that impacts associated with fugitive dust emissions would continue to be less than significant.

Additionally, the BAAQMD recommends that lead agencies assess the incremental risk of toxic air contaminant (TAC) exposure for all sensitive receptors within a 1,000-foot radius of a Project’s fence line. Although long-term Project operation would result in no new TAC emissions, construction activities associated with the Modified Project would generate diesel particulate matter (DPM), a TAC. Most DPM exhaust emissions generated during construction would be because of diesel off-road equipment and diesel generators.

The closest sensitive receptors to the Modified Project would be the Lakewood Apartments along the south side of John Muir Drive and north of the Vista Grande Tunnel’s east portal. These apartments are located 200 feet from the Pacific Rod and Gun Club work area, 300 feet from the Lake Merced Portal, 300 feet or more from additional Canal components, and 600 feet from the modified work area within Fort Funston. Additional sensitive receptors are near habitat restoration sites, such as Lowell High School and the Lakeshore neighborhood, located at various distances within the 1,000-foot buffer. None of the Modified Project elements or nearby sensitive receptors are located within an Air Pollution Exposure Zone, as designated by the San Francisco Health Department.

As discussed in the EIR/EIS, off-road equipment is a large contributor to DPM emissions in California. However, since 2007, the California Air Resources Board has found that the emissions were substantially lower than previously expected (CARB 2010). Additionally, federal and state regulations require cleaner off-road equipment. Specifically, both the U.S. Environmental Protection Agency and the State of California have set emissions standards for new off-road equipment engines, ranging from Tier 1 to Tier 4. Although the full benefits of these regulations will not be realized for several more years, the U.S. Environmental Protection Agency estimates that by implementing the federal Tier 4 standards, NOx and PM emissions will be reduced by more than 90 percent (EPA 2004).

Furthermore, as a major construction Project
1 within the jurisdiction of the city and county of San Francisco and within 1,000 feet of sensitive receptors, construction work would be subject to the conditions of the City and County of San Francisco’s Clean Construction Ordinance, updated in

1 A major construction project is defined as a public work to be performed within the geographic limits of the city that uses off-road equipment and is estimated to require 20 or more cumulative days of work, including non- consecutive days, to complete.

Page 55 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-9 ESA / D200700036.01 EIR/EIS Addendum June 2025
March 2015. The Clean Construction Ordinance requires that such construction projects use only off-road equipment and off-road engines fueled by biodiesel fuel grade (B20). Additionally, the off-road equipment must either meet or exceed Tier 2 standards for off-road engines or operate with the most effective Verified Diesel Emission Control Strategies.

Additionally, due to their temporary and variable nature, construction activities are not suitable for assessing long-term health risks. The BAAQMD’s CEQA Air Quality Guidelines (BAAQMD 2022) states the following:

Due to the variable nature of construction activity, the generation of TAC emissions in most cases would be temporary, especially considering the short amount of time such equipment is typically within an influential distance that would result in the exposure of sensitive receptors to substantial concentrations. Concentrations of mobile-source diesel PM emissions are typically reduced by 70 percent at a distance of approximately 500 feet (CARB, 2005). In addition, current models and methodologies for conducting health risk assessments are associated with longer-term exposure periods of 9, 40, and 70 years, which do not correlate well with the temporary and highly variable nature of construction activities. This results in difficulties with producing accurate estimates of health risk.

Therefore, Project-level analyses of construction activities tend to produce overestimated assessments of long-term health risks. However, within Air Pollutant Exposure Zones, additional construction activity may negatively affect populations already at a higher risk for adverse long- term health risks from existing air pollution sources. The Modified Project site is not located within any identified Air Pollutant Exposure Zones.

For the Modified Project, additional DPM emissions generated would be limited to 18 months in the Tunnel portals’ vicinity where the diesel generators would be in use, and 17–37 months in the Pacific Rod and Gun Club work area’s vicinity and in the additional Canal components’ vicinity (i.e., staging areas, access ramp, water recirculation pump). Additional DPM emissions would be in the habitat restoration sites’ vicinity around Lake Merced for approximately 5 months. All other Modified Project components would be located more than 1,000 feet from sensitive receptors.

Although diesel generators, off-road equipment, and on-road heavy-duty diesel vehicles on designated truck routes would be used during these months of construction, emissions would be temporary and variable and would not be expected to expose sensitive receptors to substantial air pollutants outside Air Pollutant Exposure Zones. Furthermore, the Modified Project would be subject to, and would comply with, California regulations limiting idling to no more than 5 minutes, further reducing exposure of nearby sensitive receptors to temporary and variable DPM emissions.

Therefore, the impact would remain less than significant.

Diesel equipment used to construct the Modified Project may emit objectionable odors associated with diesel fuel combustion. However, these emissions would be temporary and intermittent.

Therefore, odor impacts associated with diesel combustion during construction activities would remain less than significant.

Page 56 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-10 ESA / D200700036.01 EIR/EIS Addendum June 2025
Conclusion
Implementation of Mitigation Measure 3.3-1, as included in the EIR/EIS, would reduce potentially significant impacts on air quality in the Project area to a less-than-significant level.

Additionally, the Modified Project would obtain any necessary permits with the City and County of San Francisco, Daly City, or the BAAQMD, and would implement any necessary dust control plans and BMPs as part of those permits. Furthermore, construction activities associated with the Modified Project would be temporary, lasting between 24 and 44 months, as discussed in the EIR/EIS. The Modified Project would not result in any new or more severe significant impacts than those identified in the certified EIR/EIS. (Same impact as previously approved project [less than significant with mitigation].)

Page 57 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-11 ESA / D200700036.01 EIR/EIS Addendum June 2025

3.3 Biological Resources

3.3.1 Setting
The sensitive and regulated vegetation communities, habitat types, and plant and animal species described in Section 3.4, Biological Resources, of the EIR/EIS remain applicable to the Modified Project. The biological resources in the additional work and staging areas are generally consistent with those described in the EIR/EIS. As discussed in Appendix A of the Lake Merced West Project EIR (SF Planning 2022), the land uses in the Pacific Rod and Gun Club site’s vicinity include parks, golf courses, and urban residential and commercial development. Urban development is primarily concentrated on the south side of John Muir Drive and the east side of Lake Merced Boulevard. Although the site is located within a densely developed area of San Francisco, there has been limited human interference on-site since remediation activities in 2016. After completion of remediation activities, the site’s vegetation was restored and it continues to be routinely monitored for performance by qualified biologists. Several diverse vegetation communities and habitat types, including perennial grassland, mixed coastal scrub and woodland, arroyo willow riparian scrub, freshwater marsh, and lacustrine, provide refuge for local wildlife among the largely developed upland areas bordering the Lake Merced system.

3.3.2 Findings of the EIR/EIS
The EIR/EIS identified the potential for less-than-significant impacts with mitigation incorporated related to biological resources.

3.3.3 Project Change Analysis
Discussion
The Modified Project includes components that could potentially cause additional impacts on biological resources in the Project area. Additional impacts would primarily be from the restoration and enhancement of habitat restoration sites around Lake Merced, which would require vegetation and tree removal. Other components of the Modified Project may also potentially cause additional impacts on biological resources through vegetation removal and ground disturbance, such as the installation of the water recirculation pump, use of the Pacific Rod and Gun Club work area, use of additional staging areas, and the installation of an access ramp along the Canal.

As described in Section 3.4.5, Impact Analysis, of the EIR/EIS, Project construction could have a substantial adverse effect either directly or through habitat modifications on plant and animal species identified as sensitive or special-status in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service. Under the Modified Project, construction activities would occur in several areas around Lake Merced and Fort Funston that were not previously considered in the EIR/EIS. These activities would include site preparation, vegetation and tree removal, ground disturbance activities, and temporary irrigation. Increased construction activity, which can cause stress or abandonment of nests and roosts, loss or conversion of habitat, or direct mortality, would be considered significant impacts.

Page 58 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-12 ESA / D200700036.01 EIR/EIS Addendum June 2025
As discussed in the EIR/EIS, these could include impacts on special-status and protected plant, reptile, bird, and bat species, as well as sensitive natural communities (e.g., coastal dune scrub).

The Modified Project would be required to implement Mitigation Measures 3.4-1 through 3.4-5 to reduce impacts on special-status and otherwise protected plant and animal species and sensitive natural communities to less-than-significant levels. Specifically, the Modified Project would implement the following measures:

Mitigation Measure 3.4-1: Requires avoidance, minimization, and compensation for impacts on special-status plants.

Mitigation Measure 3.4-2a: Requires construction worker environmental awareness program training.

Mitigation Measure 3.4-2b: Requires avoidance and minimization measures for western pond turtle.

Mitigation Measure 3.4-3: Includes measures to protect nesting birds, addressing potential impacts even though the Modified Project does not include known rookery habitat.

Mitigation Measure 3.4-4: Requires avoidance and minimization measures for special- status bats.

Mitigation Measure 3.4-5: Requires avoidance, minimization, and compensation for impacts on central dune scrub.

No special-status fish species occur within Lake Merced waters; however, western pond turtles reside in the lake and could be adversely affected by in-water work associated with the Modified Project, including activities required for the construction of components, such as the proposed water recirculation pump. Implementation of Mitigation Measure 3.4-2b would reduce potential impacts on the western pond turtle to a less-than-significant level by requiring the installation of terrestrial exclusion fencing around these lakeside construction areas, the installation of a cofferdam around isolated in-water work areas, the completion of preconstruction surveys, and implementation of additional measures during site construction.

Additionally, as discussed in the EIR/EIS, Project construction would have a substantial adverse effect on upland vegetation communities identified in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service. Project construction could affect sensitive communities through the introduction or spread of invasive plants and could have a substantial adverse effect on wetlands and other jurisdictional waters. Under the Modified Project, as discussed throughout Section 2.2, Proposed Modifications to the Project, additional construction activities would be required throughout Lake Merced, Fort Funston, and the surrounding areas. These construction activities would include additional work areas, staging areas, and components that would require additional vegetation and tree removal, site preparation, ground-disturbing activities, and temporary irrigation; additional site disturbance could introduce invasive species.

The Modified Project would be required to implement Mitigation Measures 3.4-6 through 3.4-8b to reduce impacts on upland areas and wetlands and impacts associated with the spread of invasive

Page 59 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-13 ESA / D200700036.01 EIR/EIS Addendum June 2025
species. As discussed in EIR/EIS Impact 3.4-6, damage or removal of protected trees in areas under San Francisco Department of Public Works (SFDPW) jurisdiction is subject to a SFDPW permit. However, none of the Modified Project areas, or trees that would be damaged or removed, are under SFDPW jurisdiction. It is also noted that the restored willow riparian habitat at Lake Merced would replace non-native trees with native tree species. The Modified Project would implement the following measures:

Mitigation Measure 3.4-6: Requires Daly City to implement tree protection measures that require identification of trees to be removed, trimmed, or retained, and procedures for tree protections during construction.

Mitigation Measure 3.4-7a: Requires control measures to reduce the spread of invasive species.

Mitigation Measure 3.4-7b: Requires post-construction treatment of upland areas disturbed by construction activities.

Mitigation Measure 3.4-8a: Calls for wetland protection and avoidance.

Mitigation Measure 3.4-8b: Requires compensation for any impacts on wetlands or riparian habitat.

The Modified Project construction could also interfere substantially with the movement of native resident or migratory species, disrupt established native resident or migratory corridors, or impede the use of nursery sites. This interference would result primarily from the use of nighttime lighting, which may be required for additional construction activities. To mitigate these impacts, the Modified Project would implement Mitigation Measure 3.4-9, which would require minimizing nighttime lighting where feasible and calls for measures to reduce impacts when nighttime lighting cannot be avoided.

Additional impacts on biological resources could occur from lake level changes due to the Project’s operation. To address these impacts, the Modified Project would be required to implement Mitigation Measures 3.4-10a and 3.4-10b, which would reduce impacts from the Modified Project’s operation to less-than-significant levels. These measures would manage water levels to reduce Project-related losses of sensitive communities or provide compensatory mitigation if such losses cannot be avoided.

The proposed habitat restoration sites would remove existing non-native forest habitat, including 804 trees, and restore native arroyo willow riparian and freshwater marsh habitat along the Lake Merced shoreline (above the Modified Project’s operational WSE). The trees proposed for removal from the habitat restoration sites are primarily non-native species, such as blue gum eucalyptus, myoporum, Monterey cypress, and blackwood acacia, with other species in less abundance. The habitat restoration sites would be replanted mostly with native willow riparian habitat along the Lake Merced shoreline, freshwater marsh (wetland) plants, and coastal scrub habitat. After planting, the willow riparian and coastal scrub habitats would be seeded with a native seed mix of herbaceous understory species.

Page 60 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-14 ESA / D200700036.01 EIR/EIS Addendum June 2025
Since publication of the EIR/EIS, the U.S. Fish and Wildlife Service proposed listing the monarch butterfly (Danaus plexippus) as threatened under the federal Endangered Species Act (USFWS 2024). The western monarch butterfly population migrates from interior breeding areas to the coast in October and November to overwinter until March when they return to breeding areas for spring and summer. Overwintering monarchs aggregate in tree groves typically located within 1.5 miles of the coastline where specific microclimate conditions of high humidity, low winds, mixed sunlight, protection from freezing temperatures, and access to freshwater are present. Monarchs most commonly roost in stands of blue gum eucalyptus trees but also use Monterey pine and Monterey cypress trees (Xerces Society et al. 2025).

A monarch butterfly overwintering site has been documented and tracked by the Xerces Society for Invertebrate Conservation (Xerces Society) since 2008 within the non-native forest at Stern Grove and Pine Lake in San Francisco, located 0.5 mile north of Lake Merced. Four other known overwintering sites in San Francisco are identified within tree stands at 26th Avenue and Fulton Street in Golden Gate Park, Rob Hill in the Presidio, Fort Mason near Building 201, and Telegraph Hill in North Beach. Several other potential overwintering sites being tracked by the Xerces Society are located in Golden Gate Park, Lovers Bridge in the Presidio, and McClaren Park (Xerces Society 2017).

Non-native forest habitat around Lake Merced contains similar tree species composition to the other known or potential sites identified in San Francisco but has not been identified by the Xerces Society as containing known or potential overwintering sites. Through development of the habitat restoration sites, the Modified Project would remove approximately 1.44 acres of non-native forest habitat from around the lake, 31 percent of the total non-native forest habitat (4.62 acres) surrounding the greater Lake Merced system (ESA 2024). Environmental Science Associates conducted surveys to identify monarch use of non-native forest habitat within the habitat restoration sites during the 2024–2025 overwintering season in February 2025, following the Xerces Society’s Western Monarch Habitat Assessment Survey protocol (Xerces Society 2024). Biologists experienced in conducting these protocol-level surveys for overwintering monarch populations performed pedestrian surveys of the habitat restoration sites using binoculars to scan tree stands for roosting monarch butterflies. During the surveys, biologists also visited Stern Grove, where roosting aggregates are known to be present. No overwintering monarch roosts were identified during the surveys within the habitat restoration sites (ESA 2025).

Because overwintering roosts are returned to year after year, areas that do not contain suitable conditions are expected to remain absent of monarch butterflies (James 2024). Therefore, it is expected that the trees identified for removal within the habitat restoration sites would not contain overwintering roosts when construction at these locations commences in late summer to fall 2025.

Furthermore, tree removal activities that would affect non-native forest habitat within the habitat restoration sites would begin in August or September 2025, preceding the arrival of monarchs to overwintering sites in October and November. Additionally, ongoing disturbance to this habitat type within the mitigation sites throughout October, November, and December would deter monarchs from establishing overwintering roosts in the Lake Merced area, making direct impacts on active overwintering populations from tree removal under the Modified Project unlikely.

Because overwintering roosts have not been previously documented in any non-native forest

Page 61 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-15 ESA / D200700036.01 EIR/EIS Addendum June 2025
habitat at Lake Merced, combined with the likely ongoing construction disturbance of the mitigation sites during the arrival period for migrating monarchs, the Modified Project’s impact on the proposed threatened monarch butterfly associated with the removal of potential overwintering habitat would be less than significant.

After completion of the Modified Project, work and staging areas would be restored to pre- Project conditions or similar. Most areas would be revegetated with native species associated with freshwater marsh, willow riparian, coastal scrub, or dune species, as appropriate and consistent with surrounding vegetation. With implementation of Mitigation Measures 3.4-1 through 3.4-10b and the installation of the proposed habitat restoration sites, impacts on special-status species and lake sensitive habitat would be reduced to less-than-significant levels. This would be similar to other Project areas considered in the EIR/EIS. Therefore, impacts would be consistent with the EIR/EIS and would remain less than significant with mitigation incorporated.

Conclusion
Implementation of Mitigation Measures 3.4-1 through 3.4-10b included in the EIR/EIS would reduce any potentially significant impacts, including those on vegetation communities and wildlife habitat, supported special-status plant and animal species, wetlands, and impacts related to potential conflicts with local and regional conservation plans or ordinances protecting biological resources to less-than-significant levels. Impacts on established native resident or migratory wildlife corridors would remain less than significant. The Modified Project would not result in any new or substantially more severe significant impacts than those identified in the certified EIR/EIS. (Same impact as previously approved project [less than significant with mitigation].)

Page 62 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-16 ESA / D200700036.01 EIR/EIS Addendum June 2025

3.4 Cultural Resources

3.4.1 Setting
The regional setting and regulatory framework related to cultural and paleontological resources described in Section 3.5, Cultural Resources, of the EIR/EIS have not changed and remain applicable to the Modified Project.

The Pacific Rod and Gun Club site has been identified as a historic resource, meeting Criterion 1 of the California Register of Historical Resources for its association with historic events, as detailed in the Lake Merced West Project EIR (SF Planning 2022). The site is significant as an example of the type of sportsmen’s gun club that formed in the 1920s and 1930s, reflecting the democratization of hunting and illustrating the social experience connected with the conservation movement. Additionally, the site is notable as the oldest extant skeet facility in the Bay Area and as the only sportsmen’s club in the Bay Area to retain its original pre–World War II grounds configuration, skeet field structures, and club buildings.

3.4.2 Findings of the EIR/EIS
The EIR/EIS identified three archeological and architectural resources: the 1882 schooner Neptune shipwreck, the Canal, and Fort Funston. No Native American cultural resources or human remains were identified within the Project site in the EIR/EIS. The EIR/EIS determined that there would be significant and unavoidable impacts on the Tunnel and Canal, both of which are eligible for listing in the National Register of Historic Places, and required mitigation measures to reduce impacts to the extent feasible. All or most of the Tunnel and Canal would be affected because the Project would update and modernize the aging structures. All other impacts were determined to have less-than-significant impacts with mitigation incorporated.

3.4.3 Project Change Analysis
Discussion
The Modified Project includes components that could potentially cause additional impacts on cultural resources in the Project area through ground-disturbing activities, including the addition of the Pacific Rod and Gun Club work area, modifications to Canal components, and the installation of the water recirculation pump and habitat restoration sites around Lake Merced.

As described in Section 3.5.5, Impact Analysis, of the EIR/EIS, the Project would have an impact on archaeological resources if it would cause a substantial adverse change to a significant archaeological resource, including those that qualify as historical resources according to CEQA Guidelines Section 15064.5, unique archaeological resources as defined in CEQA Section 21083.2(g), and historic properties that meet the National Register of Historic Places listing criteria in Code of Federal Regulations Title 36, Section 60.4.

The Modified Project would include construction activities in areas not discussed in the EIR/EIS, such as the Pacific Rod and Gun Club work area or areas covered under the EIR/EIS that were

Page 63 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-17 ESA / D200700036.01 EIR/EIS Addendum June 2025
not expected to be disturbed. The EIR/EIS found that, while the scenario is unlikely, ground- disturbing activities could expose and cause impacts on unknown archaeological resources or shipwrecks, which would be a potentially significant impact. Similarly, while the scenario is unlikely, there is still the potential for the Modified Project to cause a substantial adverse change in the significance of an archaeological resource.

The Modified Project would also implement Mitigation Measure 3.5-3, which requires construction activities to halt if archaeological resources are identified. This measure would allow a qualified archaeologist, or NPS archaeological resources staff if located on federally administered lands, to inspect the find and provide additional recommendations as necessary, with the goal of avoiding, minimizing, or mitigating adverse effects.

Furthermore, no known human burial locations have been identified in the Project area; however, the possibility cannot be entirely discounted. The Modified Project could result in direct impacts on previously undiscovered human remains during earthmoving activities. Impacts on human remains would be potentially significant but could be reduced to a less-than-significant level with the implementation of Mitigation Measure 3.5-4, which requires that all work halt in the find’s vicinity and that the County Coroner be contacted.

Therefore, the Modified Project would have a less-than-significant impact relative to cultural resources, and substantial physical deterioration of known or undiscovered resources would not occur.

Conclusion
Implementation of Mitigation Measures 3.5-3 and 3.5-4 included in the EIR/EIS would reduce potentially significant impacts on previously undiscovered cultural resources or human remains to a less-than-significant level. The Modified Project would not result in any new or more severe significant impacts than those identified in the certified EIR/EIS. (Same impact as previously approved project [significant and unavoidable].)

Page 64 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-18 ESA / D200700036.01 EIR/EIS Addendum June 2025

3.5 Geology and Soils

3.5.1 Setting
Although part of the Modified Project site would include locations not analyzed in the EIR/EIS, the regional setting and regulatory framework related to geology and soils described in Section 3.6, Geology and Soils, of the EIR/EIS have not changed and remain applicable to the Modified Project.

3.5.2 Findings of the EIR/EIS
The EIR/EIS analysis identified less-than-significant impacts with mitigation incorporated related to geology and soils.

3.5.3 Project Change Analysis
Discussion
The Modified Project includes components that could potentially cause additional impacts on geology and soils in the Project area, including the addition of the Pacific Rod and Gun Club work area, modifications to the Fort Funston work area, additional Canal components, and the installation of the water recirculation pump and habitat restoration sites around Lake Merced.

As described in Section 3.6, Geology and Soils, of the EIR/EIS, the Project is located in an area susceptible to fault rupture, ground shaking, and seismic-related ground failure. The use of the Pacific Rod and Gun club work area was not discussed in the EIR/EIS. Additionally, sites along the Canal, which were part of the overall Project footprint but were not likely to be disturbed, would be used as a staging area for work on the Canal. The Modified Project would be required to implement Mitigation Measure 3.6-1a, which requires that the Project be designed, engineered, and constructed in conformance with engineering practices and geotechnical recommendations to minimize potential structural damage during a seismic event. The Modified Project would also implement Mitigation Measure 3.6-1b, which requires inspectors working under the auspices of a California-licensed geotechnical engineer to be present on the Project site during excavation, grading, and general site preparation activities to monitor the implementation of the recommendations specified in this measure. Therefore, the Modified Project would have less-than-significant impacts related to strong seismic ground shaking and/or seismic-related ground failure.

Additionally, construction activities, such as excavating, trenching, and grading, can remove stabilizing vegetation and expose areas of loose soil that, if not properly stabilized during construction, can be subject to erosion by wind and stormwater runoff, potentially resulting in a significant soils impact. The Modified Project would include components that could potentially increase soil erosion through ground disturbance or vegetation removal. The Modified Project would be subject to the requirements of the National Pollutant Discharge Elimination System Construction General Permit, which includes mandatory implementation of BMPs concerning erosion control. The Project would also implement Mitigation Measure 3.6-2, which would require inspections of subdrain pipes to monitor water flows and buildup of sediment from

Page 65 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-19 ESA / D200700036.01 EIR/EIS Addendum June 2025
erosion. Compliance with the Construction General Permit, including the implementation of a Stormwater Pollution Prevention Plan, associated BMPs, and mitigation measures, would help ensure that the potential impact of soil erosion or the loss of topsoil from the Modified Project would be less than significant.

Furthermore, natural or constructed slopes could become destabilized during construction-related excavation or grading operations if located on problematic soils. Excavations for components could result in slope instability, potentially triggering slope failures that could result in landslides, slumps, soil creep, or debris flows. Additionally, there is the potential for geologic hazards at the Ocean Outlet along the Fort Funston bluffs. However, the Modified Project would be required to implement Mitigation Measures 3.6-3a and 3.6-3b, which would reduce the impacts associated with landsliding to less-than-significant levels. These measures include adherence to the construction specifications outlined in the geotechnical report, which include measures to reduce effects related to slope instability, landsliding, and lateral earth pressure, as well as additional slope studies before final Project design.

Conclusion
Implementation of Mitigation Measures 3.6-1a through 3.6-3b included in the EIR/EIS would reduce potentially significant impacts related to geology and soils to less-than-significant levels.

The Modified Project would not result in any new or more severe significant impacts than those identified in the certified EIR/EIS. (Same impact as previously approved project [less than significant with mitigation].)

Page 66 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-20 ESA / D200700036.01 EIR/EIS Addendum June 2025

3.6 Greenhouse Gas Emissions and Climate Change

3.6.1 Setting
The greenhouse gas (GHG) emissions and climate change setting described in Section 3.7, Greenhouse Gas Emissions and Climate Change, of the EIR/EIS remain applicable to the Modified Project. The section provides an overview of existing GHG and climate change conditions within the San Francisco Bay Area Air Basin area, presents the associated regulatory framework, and analyzes potential impacts that would result from construction and operation of the facilities proposed under the Project.

3.6.2 Findings of the EIR/EIS
The EIR/EIS analysis identified that there would be no conflict with an applicable plan, policy, or regulation of an agency adopted for the purpose of reducing the emissions of GHGs. The EIR/EIS analysis determined that less-than-significant impacts with mitigation incorporated related to GHGs and climate change would occur as part of the Project.

3.6.3 Project Change Analysis
Discussion
The Modified Project includes components that could potentially cause additional impacts on GHG emissions in the Project area, primarily due to the use of diesel generators. However, other components of the Modified Project may also produce an incremental change in GHG emissions.

Construction activities associated with the Modified Project (e.g., installing a water recirculation pump, installing habitat restoration sites), excluding the use of diesel generators, would be the same as construction activities described in the EIR/EIS, just at different locations. These activities would result in a negligible net change in long-term baseline conditions and GHG emissions. Therefore, the impacts from these modifications are not discussed further.

As described in Section 3.7.5, Impact Analysis, of the EIR/EIS, Project construction would occur over 24–44 months. Most of the Project-related GHG emissions would be generated off-site from construction worker vehicle trips to and from the site and from heavy-duty haul trucks transporting soil, gravel, and debris. Off-road construction vehicle use, including the use of a crane and excavators, would also contribute to construction GHG emissions.

The BAAQMD’s Revised Draft Options and Justification Report (BAAQMD 2009) identifies qualitative and quantitative operations-related thresholds of significance for GHG emissions. For projects other than stationary sources, the qualitative threshold is noncompliance with a qualified climate action plan or qualified general plan. The quantitative threshold is annual operational emissions exceeding 1,100 metric tons of carbon dioxide equivalent (CO 2e). For stationary-
source projects, the quantitative threshold is 10,000 metric tons of CO2e per year. No threshold has been established for GHG emissions generated during construction. In the absence of such thresholds, this analysis applies the BAAQMD’s threshold of 1,100 metric tons of CO2e per year

Page 67 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-21 ESA / D200700036.01 EIR/EIS Addendum June 2025
for non-stationary-source projects. However, the Project would not involve installing a stationary source requiring a BAAQMD permit.

Estimated Project construction GHG emissions are presented in Table 3-2.

TABLE 3-2

ESTIMATED PROJECT CONSTRUCTION GREENHOUSE GAS EMISSIONS Construction Activity Source Year 1 Year 2 Year 3
Off-road Equipment Emissions 192.4 1,575.8 393.7
Vehicle Emissions 700.7 622.4 41.9
Total Construction Emissions 893.1 2,198.2 435.6
Significance Threshold 1,100.0 1,100.0 1,100.0
Significant Impact? No Yes No
SOURCE: ESA 2017

As indicated in Table 3-2, total short-term Project construction-related GHG emissions would be below BAAQMD’s quantitative threshold of 1,100 metric tons of CO2e per year for non- stationary sources in construction years 1 and 3 but would be above this threshold during year 2.

Therefore, GHG emissions from Project construction are considered significant during year 2.

As discussed in Section 2.2, Proposed Modifications to the Project, the Modified Project would include the use of diesel generators for construction activities associated with the Tunnel. These generators would be used 24 hours a day, 5 days a week, with demand decreasing by 25 percent after the first 6 months of use, for year 2 of construction. One generator would be located at the Fort Funston work area and the other at the Tunnel’s east portal; both would be used to power components related to the Tunnel phase of the Project. Although the addition of the diesel generators would increase GHG emissions, the Modified Project would remain below the federal threshold of 25,000 metric tons of CO2e for adverse environmental impacts from construction- related GHG emissions. However, GHG emissions would still be above the BAAQMD’s threshold of 1,100 metric tons per year. Therefore, this impact would still be considered significant for year 2 of construction activities.

Therefore, the Modified Project would be required to implement Mitigation Measure 3.7-1, which requires Daly City and its contractors to implement several measures to reduce GHG emissions. The mitigation measure would include limiting idling, requiring the use of B20 biodiesel (which would reduce GHG emissions from generator operation by 20 percent), and requiring Daly City to purchase carbon offsets for any GHG emissions over the 1,100 metric ton per year threshold.

Conclusion
Implementation of Mitigation Measure 3.7-1 included in the EIR/EIS would reduce potentially significant impacts from construction and operation to less-than-significant levels. The Modified Project would not result in any new or more severe significant impacts than those identified in the

Page 68 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-22 ESA / D200700036.01 EIR/EIS Addendum June 2025
certified EIR/EIS. (Same impact as previously approved project [less than significant with mitigation].)

Page 69 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-23 ESA / D200700036.01 EIR/EIS Addendum June 2025

3.7 Hydrology and Water Quality

3.7.1 Setting
The hydrology and water quality setting described in Section 3.9, Hydrology and Water Quality, of the EIR/EIS remains applicable to the Modified Project. The section provides an overview of existing hydrology and water quality conditions within the Bay Area, presents the associated regulatory framework, and analyzes potential impacts that would result from construction and operation of the facilities proposed under the Project.

3.7.2 Findings of the EIR/EIS
The EIR/EIS analysis identified significant and unavoidable impacts related to the alteration of coastal landforms. The Project could have substantial adverse effects on local shoreline sand supply, shoreline processes, and localized rates of erosion, and would continue to prevent the bluffs and shoreline from eroding naturally. All other impacts were determined to be less than significant with mitigation incorporated.

3.7.3 Project Change Analysis
Discussion
The Modified Project includes components that could potentially cause additional impacts on hydrology and water quality in the Project area, including the addition of the Pacific Rod and Gun Club work area, modifications to the Fort Funston work area, the Ocean Outlet design, the Canal components, and the installation of the water recirculation pump and habitat restoration sites around Lake Merced.

These potential impacts would arise from additional construction activities around Lake Merced, such as the use of a cofferdam and dewatering for the installation of the water recirculation pump, vegetation removal and planting for the habitat restoration sites, and the addition of staging areas along the Canal and work areas at the Pacific Rod and Gun Club near the bank of Lake Merced.

The Modified Project would also include an additional work area in the Fort Funston parking lot and the removal of wing walls from the Ocean Outlet design; these components would be near Funston Beach and the Pacific Ocean and could potentially affect coastal waters and resources.

As mentioned previously, the Modified Project would include additional staging and work areas around Lake Merced and Fort Funston, soil-disturbing activities, and vegetation removal activities required for the installation of the water recirculation pump and the habitat restoration areas. As a discharger, Daly City must comply with the requirements of Order No. 2009-0009-DWQ, as amended by 2010-0014-DWQ and 2012-0006-DWQ, otherwise referred to as the “Construction General Permit.” This would require the implementation of a stormwater pollution prevention plan and BMPs to control Project-related runoff. As discussed in the EIR/EIS, the stormwater pollution prevention plan must be designed to address the following objectives:

Page 70 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-24 ESA / D200700036.01 EIR/EIS Addendum June 2025
• All pollutants and their sources, including sources of sediment associated with construction, construction site erosion, and all other activities associated with construction activity are controlled.
• Where not otherwise required to be under a Regional Water Quality Control Board permit, all non-stormwater discharges are identified and either eliminated, controlled, or treated. • Site BMPs are effective and result in the reduction or elimination of pollutants in stormwater discharges and authorized non-stormwater discharges from construction activity to the applicable defined standard.
• Calculations and design details as well as BMP controls for site run-on are complete and correct.
• Stabilization BMPs are implemented to reduce or eliminate pollutants after construction is completed.

In addition to the requirements of the Construction General Permit, the Modified Project components constructed in the Canal construction area, served by the SFPUC separate storm sewer system, would be subject to compliance with the SFPUC Stormwater Management Plan’s measures to minimize stormwater pollution in areas of San Francisco served by separate storm sewer systems. Additionally, in accordance with Article 4.1 of the San Francisco Public Works Code and consistent with SFPUC’s Water Pollution Prevention Program, Daly City would be required to develop and implement an Erosion and Sediment Control Plan specifying measures to prevent stormwater pollution and control runoff at each applicable site.

With the implementation of the measures required by the Construction General Permit, the development and implementation of a Stormwater Management Plan and Erosion and Sediment Control Plan, and the restoration of disturbed areas to pre-Project conditions after completion of construction activities, potential impacts of the Modified Project related to increased erosion and stormwater runoff would remain less than significant and temporary.

As discussed previously, the Modified Project would require dewatering activities for the installation of the water recirculation pump. It is not likely that dewatering would generate contaminated water that would require special handling or disposal; however, the contractor would have the necessary facilities (portable water treatment units located in the staging areas) to collect, handle, and treat flows that may be contaminated with cementitious products, silts and sediments, oil and grease from equipment, and other potential contaminants. Discharge water quality would be tested and maintained in accordance with dewatering discharge permit requirements. All Project-related dewatering discharges would be performed in accordance with regulatory requirements, and any necessary permits would be obtained. Therefore, impacts of the Modified Project related to violating water quality standards or degrading water quality due to groundwater discharges during construction dewatering would be less than significant.

Waters isolated within cofferdam areas have a high potential to contain high concentrations of sediment as a result of the level of ground disturbance within the isolated work area. The direct discharge of such waters from the cofferdam areas to Lake Merced could result in localized increases in suspended sediment and turbidity that could persist for the duration of dewatering activities. If the water from the isolated work areas were discharged directly to Lake Merced,

Page 71 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-25 ESA / D200700036.01 EIR/EIS Addendum June 2025
these discharges could violate water quality standards or substantially degrade water quality, resulting in a potentially significant water quality impact. As discussed previously, the Modified Project would include the use of a cofferdam to install the water recirculation pump. However, Mitigation Measure 3.9-1 would reduce this potential impact on water quality to a less-than- significant level by requiring the implementation of standard BMPs to remove sediment from the dewatering discharge directed to receiving waters, and to control the rate of discharge to prevent adverse effects related to runoff, flooding, and damage to adjacent structures.

Furthermore, as discussed in the EIR/EIS, the Project could conflict with plans, policies, or regulations related to the alteration of coastal landforms or processes adopted to avoid or mitigate environmental effects, resulting in a significant and unavoidable impact. The Project’s construction and operation could alter the existing natural beach dynamics and the coastal environment, thereby resulting in altered bluff erosion rates and patterns. Coastal development in California is regulated by the Coastal Commission pursuant to the California Coastal Act. This law stipulates that new developments that could alter natural shoreline processes shall be permitted when required to serve coastal dependent uses, protect existing structures, and only when designed to eliminate or mitigate adverse impacts on local shoreline sand supply (Public Resources Code Section 30235). This law also states that new development must do the following (Public Resources Code Section 30253[b]):
[A]ssure stability and structural integrity, and neither create nor contribute significantly to erosion, geologic instability, or destruction of the site or surrounding area or in any way require the construction of protective devices that would substantially alter natural landforms along bluffs and cliffs.

The Project was designed with wing walls to emulate the reduced bluff recession rates associated with the SFPUC outlet and to reduce the potential for outflanking2 of the outlet structure.

Furthermore, the wing walls were added to address the force of high tides and associated wave action, and other coastal processes, including sea level rise, affecting local beach and bluff erosion rates. However, the Preliminary Coastal Engineering Study did not assess the potential impacts of the recommended wing walls on local coastal processes, such as sediment supply, beach profile alterations, or beach and bluff toe retreat. Although the wing walls would assist with structural integrity, they may substantially alter natural landforms along the bluff face by slowing the rate of erosion (Moffatt and Nichol 2013).

The EIR/EIS concluded, based on the available technical studies, professional opinion, and current projections of sea level rise and coastal erosion, that the Project could have substantial adverse effects on local shoreline sand supply, shoreline processes, and localized rates of erosion, and would continue to prevent the bluffs and shoreline from eroding naturally. Under the Modified Project, based on consultation with the Coastal Commission, the wing walls would be removed from the final design. Additionally, the Modified Project would implement Mitigation Measure 3.9-2, which would help ensure that the Project would conform with NPS management policies. This measure would require that the Project design is reasonably assured of surviving its

2 Basically, going around the side of the structure.

Page 72 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-26 ESA / D200700036.01 EIR/EIS Addendum June 2025
planned lifespan without the need for shoreline control measures. Furthermore, this measure would implement steps to minimize safety hazards and harm to property and natural resources.

However, even with the implementation of Mitigation Measure 3.9-2 and the removal of the wing walls, the Modified Project may still result in inconsistency with the policies governing local shoreline sand supply and alteration of landforms due to the construction of shoreline protective devices, outlined in California Coastal Act Sections 30235 and 30253. Therefore, this impact would remain significant and unavoidable despite the incorporation of available and feasible mitigation measures. This finding is due in part to the inherent inconsistency between the policies requiring structural integrity with the policy aimed at avoiding shoreline protective devices that would substantially alter natural landforms along bluffs and cliffs.

The Modified Project would also require temporary water supplies to irrigate native plantings for approximately 3 years from water lines operated by the City and County of San Francisco. The proposed plantings would use 2.5 acre-feet of water per year after initial planting until vegetation is established. Additionally, seeded areas may use up to 3.5 acre-feet of water combined in the months immediately after seeding. Given the short-term nature of Project construction and the incremental demand for water during the construction period, the Modified Project would be unlikely to require new water entitlements or new or expanded local water supplies. Therefore, the impact would be less than significant.

Conclusion
Implementation of Mitigation Measures 3.9-1 and 3.9-2 included in the EIR/EIS would reduce potentially significant impacts from construction and operation. However, impacts would remain significant and unavoidable. The Modified Project would not result in any new or more severe significant impacts than those identified in the certified EIR/EIS. (Same impact as previously approved project [significant and unavoidable].)

Page 73 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-27 ESA / D200700036.01 EIR/EIS Addendum June 2025

3.8 Noise and Vibration

3.8.1 Setting
The noise and vibration setting described in Section 3.11, Noise and Vibration, of the EIR/EIS remains applicable to the Modified Project. The section provides an overview of existing noise and vibration conditions within the Project area, presents the associated regulatory framework, and analyzes potential impacts that would result from construction and operation of the facilities proposed under the Project.

3.8.2 Findings of the EIR/EIS
The EIR/EIS analysis identified less-than-significant impacts with mitigation incorporated related to noise and vibration would occur.

3.8.3 Project Change Analysis
Discussion
The Modified Project includes components that could potentially cause additional noise and vibration impacts in the Project area, including the use of the Pacific Rod and Gun Club work area, diesel generators, and ventilation fans, and the installation of the water recirculation pump.

As described in Section 3.11.5, Impact Analysis, of the EIR/EIS, temporary construction-related noise effects would be significant if any of the following would occur:
• Construction noise audible beyond the property of origin would be generated within Daly City between 10:00 p.m. and 6:00 a.m., as specified in the Daly City Municipal Code. • Construction activity within San Francisco would generate noise levels in excess of 5 A- weighted decibels (dBA) above the existing ambient noise levels at the nearest property line between the hours of 8:00 p.m. and 7:00 a.m.
• Noise levels from specific non-impact construction equipment operating in San Francisco would exceed 80 dBA at 100 feet.
• Noise levels would exceed 70 dBA (speech interference criterion) at the nearest sensitive receptor (building exterior) for construction activities in one place for more than 2 weeks. • Construction activities would generate substantial temporary or periodic increase in ambient noise levels in the Project vicinity above levels existing without the Project.

Table 3-3 outlines typical noise levels produced by construction equipment that are expected to be in operation during Project construction.

The Modified Project would require the use of seven diesel generators and two ventilation fans.

One generator and fan would be located within the Fort Funston work area and another generator and fan would be located near the Tunnel’s east portal adjacent to the Lakewood Apartments.

Ventilation fans would not be used between 8:00 p.m. and 7:00 a.m., and diesel generators are expected to be used 24 hours a day, 5 days a week, with a 25 percent reduction in demand after

Page 74 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-28 ESA / D200700036.01 EIR/EIS Addendum June 2025
the first 6 months. The generator and fan at the Fort Funston work area would be approximately 600 feet from the nearest sensitive receptor, and the generator and fan located at the Tunnel’s east portal would be 380 feet from the nearest sensitive receptor. The Modified Project would be required to implement Mitigation Measure 3.11-1, which would require that stationary noise- generating construction equipment be muffled, enclosed within temporary sheds, and that insulation be used to minimize noise without interfering with construction.

TABLE 3-3

TYPICAL NOISE LEVELS PRODUCED BY CONSTRUCTION EQUIPMENT Construction Equipment Noise Levels (dBA, Leq at 50 feet) Excavator 81
Compactor 83
Impact or Vibratory Pile Driver 101
Crane 81
Loader 79
Drill Rig 79
Air Compressor 78
Ventilation Fan 79
Dump Truck 76
Generator 81
NOTES: dBA = A-weighted decibels; Leq = equivalent continuous sound pressure level.

SOURCE: ESA 2017

With this measure, noise from the diesel generators and ventilation fans would be attenuated by approximately 10 decibels. Therefore, the use of diesel generators and ventilation fans would produce noise levels up to 51 dBA at the nearest sensitive receptor. This would not exceed the San Francisco Noise Ordinance threshold of 80 dBA at 100 feet, and therefore, the impact would not be significant under this threshold. This level also would not exceed the 70 dBA speech interference criterion for 2 or more weeks and would not exceed 5 dBA above the existing ambient noise level of 56 dBA (SF Planning 2022). Additionally, local topography and natural barriers, such as fences and trees, would further reduce construction noise exposure at individual residences and would not exceed regulatory significance thresholds. With the incorporation of Mitigation Measure 3.11-1, impacts from the use of diesel generators and ventilation fans would be less than significant.

The Modified Project would also include non-impact construction activities, such as the installation of habitat restoration sites and a water recirculation pump, use of the Pacific Rod and Gun Club and Fort Funston work areas, use of additional staging sites, and the installation of an access ramp along the Canal. These components would include similar construction activities already described in the EIR/EIS and shown in Table 3-3. The loudest source of non-impact noise generated from typical construction activities would be an excavator, generating 81 dBA while removing plants or soil. Noise from construction activities generally attenuates at a rate of 6 decibels (dB) per doubling of distance (Caltrans, 2013). Assuming an attenuation rate of 6 dB per doubling of

Page 75 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-29 ESA / D200700036.01 EIR/EIS Addendum June 2025
distance, the loudest non-impact construction equipment would reach up to 75 dBA at 100 feet.

This would not exceed the San Francisco Noise Ordinance threshold of 80 dBA at 100 feet, and therefore, the impact would not be significant under this threshold.

The nearest sensitive receptors to the Modified Project site are the residences approximately 200 feet from North Lake where habitat restoration sites 1–7 are located (see Figure 2-2); 250 feet from the Pacific Rod and Gun Club work area, the additional Canal staging areas, and the access ramp construction site; and 1,600 feet from the recirculation pump site (see Figures 2-1 and 2-3).

At these locations, ongoing construction activities could generate noise levels between 51 dBA and 69 dBA over a period of more than 2 weeks. Construction-generated noise levels below the 70 dBA speech interference criterion for a period of 2 or more weeks would result in a less-than- significant impact. Construction noise exposure at individual residences would also be further reduced by local topography and natural barriers, such as intervening structures, fences, and trees.

There may be occasional work where the noise level generated at some receptors could exceed 5 dBA above the existing ambient noise level of 60 dBA (SF Planning 2009), but these occurrences would be intermittent and would not constitute a significant impact.

Furthermore, the Modified Project would include the operation of a water recirculation pump, which would be permanently installed along the bank of Lake Merced (see Figure 2-1). As discussed in the EIR/EIS, the maximum sound level that can be expected to be generated by the water recirculation pump would be 84 dBA at a distance of 3 feet. The pump would be enclosed in an underground concrete structure to attenuate the noise generated by the pump. As discussed previously, the water recirculation pump would be located approximately 1,500 feet from the nearest sensitive receptor. Assuming a 10 dB attenuation from the concrete pump enclosure, the maximum combined noise level from the water recirculation pump would reach approximately 20 dBA at the nearest residential property boundary and therefore would have a less-than- significant impact.

In addition to regulatory thresholds, this analysis evaluates the potential for the Modified Project to result in a substantial temporary or periodic increase in ambient noise levels in the Project vicinity above levels existing without the Project. Some land uses are noise-sensitive in ways not addressed by regulatory noise thresholds, such as recreational areas used for passive activities. At Lake Merced and its surrounding recreational amenities, ambient noise levels average between 50 and 60 dBA day-night average sound level (L
dn) due to nearby heavily traveled roadways and
other urban uses. The ambient noise levels at Fort Funston generally are below 55 dBA Ldn (SF Planning 2009). As stated in the EIR/EIS, on-site construction-related activities could result in a significant impact by resulting in a substantial temporary increase in ambient noise levels at Fort Funston above levels existing without the Project. Implementation of Mitigation Measures 3.11-1 and 3.11-2, which would require the use of noise control methods and technologies, would reduce this potential impact to a less-than-significant level. However, areas closest to construction staging and work areas could result in a substantial temporary increase above noise levels existing without the Modified Project, which would be a potentially significant impact.

Therefore, on-site construction-related activities could result in a significant impact by creating a substantial temporary increase in ambient noise levels at recreational areas around Lake Merced

Page 76 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-30 ESA / D200700036.01 EIR/EIS Addendum June 2025
and Fort Funston above levels existing without the Project. Implementation of Mitigation Measures 3.11-1 and 3.11-2, which would require the use of noise control methods and technologies, would reduce this impact to a less-than-significant level.

The Modified Project may also result in a temporary increase in vibration levels, which would be a potentially significant impact. Non-impact construction activities would occur near homes at the Lakewood Apartments and the Lakeshore neighborhood, which would include the use of a large bulldozer, loaded trucks, excavators, and compactors. These residential receivers would be located 200 feet from the nearest non-impact construction activities. As discussed in the EIR/EIS, at this distance, these receptors would be exposed to vibration levels of up to 60 vibration decibels and 0.004 inch per second peak particle velocity during non-impact construction activities. These vibration levels are below the Federal Transit Administration’s construction vibration thresholds for residential land uses and building damage, and therefore, the impact would be less than significant (FTA 2006).

Conclusion
Implementation of Mitigation Measures 3.11-1 and 3-11.2 included in the EIR/EIS would reduce potentially significant impacts from construction and operation to less-than-significant levels. The Modified Project would not result in any new or more severe significant impacts than those identified in the certified EIR/EIS. (Same impact as previously approved project [less than significant with mitigation].)

Page 77 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-31 ESA / D200700036.01 EIR/EIS Addendum June 2025

3.9 Recreation

3.9.1 Setting
The recreation setting from Section 3.13, Recreation, of the EIR/EIS remains applicable to the Modified Project. The section provides an overview of existing recreation conditions within the Project area, presents the associated regulatory framework, and analyzes potential impacts that would result from construction and operation of the facilities proposed under the Project.

3.9.2 Findings of the EIR/EIS
The EIR/EIS identified the potential for less-than-significant impacts related to recreational resources.

3.9.3 Project Change Analysis
Discussion
The Modified Project includes components that could potentially cause additional impacts on recreational resources in the Project area, including modifications to the Fort Funston work area, the Ocean Outlet design, and the installation of the habitat restoration sites.

As described in Section 3.13.5, Impact Analysis, of the EIR/EIS, the Project would not include recreational facilities or require the construction or expansion of recreational facilities that might have an adverse physical effect on the environment; this would not change under the Modified Project. The Modified Project does not propose and would not require the construction or expansion of recreational facilities. The Modified Project would not result in a permanent increase in the local population or increased demand for the construction or expansion of recreational facilities due to growth.

The Modified Project may increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated. However, it is not expected that many recreationists would be displaced from recreational areas in the Project vicinity and thereby substantially increase the use of other nearby parks or recreational facilities. During Project construction, traffic and pedestrian access would be rerouted, or in some areas, such as along Funston Beach, would be temporarily restricted.

As discussed in the EIR/EIS, the Fort Funston work area would occupy approximately 4 acres of the more than 100 acres available for dog walking, restricting access to 4 percent of the area.

However, under the Modified Project, the work area would be reduced from 4 acres to 2.5 acres, or 2.5 percent of the 100 acres available. The addition of a 0.44-acre concrete fabrication work area within the Fort Funston parking lot would temporarily decrease the availability of parking for recreationists in the vicinity.

As discussed in the EIR/EIS, at the Ocean Outlet work area, a U-shaped sheet pile cofferdam would be placed around the beach outlet structure to form a barrier to exclude the public, including dogs, from the Project construction area. The cofferdam would be positioned so that

Page 78 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-32 ESA / D200700036.01 EIR/EIS Addendum June 2025
beach access would be maintained during construction. However, during times when vehicles and equipment are being transported along the beach, and during construction of the portion of the submarine outfall pipeline that would be replaced, recreationists would avoid or be restricted from this portion of the beach.

Under the Modified Project, the 70-foot and the 100-foot wing walls would be removed from the final design of the Ocean Outlet (see Figure 2-5b). There would also be other small changes to the design elements shown in the EIR/EIS, including additional supports to the anchor outfall pipe.

The work area for concrete pumping activities and the overall layout of the disturbed area for construction activities at the Ocean Outlet location would move just north of the disturbed area shown in Figure 2-5a. However, beach access for recreationists would be maintained and temporary avoidance or restrictions would be in place only when vehicles and equipment are being transported along the beach and during the construction of the portion of the submarine outfall pipeline.

Additionally, construction activities associated with the installation of the habitat restoration sites may also temporarily affect the use of recreational facilities around Lake Merced. This would include short-term impacts that would limit access to and the use of the pedestrian path encircling Lake Merced and limiting the areas on South Lake where water recreational activities, such as boating, are available. However, the construction activities associated with the habitat restoration sites would be short-term, and the impacts on recreational facilities at Lake Merced would be temporary. Furthermore, work areas for the habitat restoration sites would be close to the shore, and the overall South Lake open water area would remain available for boating.

A number of additional trails, bicycle routes, and other general recreational resources that would be available are within the Project vicinity and in the overall western San Francisco and Daly City area. The temporary increased use of other local or regional recreational resources that may be attributable to the Modified Project construction would not likely result in substantial physical deterioration of recreation resources, or otherwise result in physical degradation of existing recreation resources. The potential impact on these other recreation resources would not be more significant than outlined in the EIR/EIS.

Therefore, the Modified Project would have a less-than-significant impact relative to a potential increase in the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facilities would occur.

Conclusion
The Modified Project would not result in any new or more severe significant impacts than those identified in the certified EIR/EIS. (Same impact as previously approved project [less than significant].)

Page 79 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-33 ESA / D200700036.01 EIR/EIS Addendum June 2025

3.10 Energy Conservation

3.10.1 Setting
The energy conservation setting described in Section 4.2, Energy Conservation, of the EIR/EIS remains applicable to the Modified Project. The section provides an overview of existing energy conservation conditions within the Bay Area, presents the associated regulatory framework, and analyzes potential impacts that would result from construction and operation of the facilities proposed under the Project.

3.10.2 Findings of the EIR/EIS
The EIR/EIS analysis identified that no significant impacts related to energy conservation would occur.

3.10.3 Project Change Analysis
Discussion
The Modified Project includes components that could potentially cause additional impacts on energy conservation in the Project area, including the use of diesel generators for construction activities.

As described in Section 4.2.2, Direct and Indirect Effects, of the EIR/EIS, the precise amount of petroleum fuel demand that would be required to construct the Project is uncertain. However, it is likely that gasoline and diesel would be used for construction equipment and worker and haul vehicles, comparable to similar construction projects. This consumption would not have a measurable effect on local and regional energy supplies.

As discussed in Section 2.1, Prior Project Description, electricity demand during construction would be 1,300 kilowatts, and electricity would be provided to the work area at Fort Funston via a temporary PG&E service connection or by using a portable diesel-powered generator. After certification of the EIR/EIS, Daly City and the NPS determined that the use of a temporary PG&E service connection would not be feasible. Therefore, under the Modified Project, construction activities would be powered by two Tier 4 generators with 80 hp engines. The generators would use diesel fuel and would operate 24 hours a day, 5 days a week, for approximately 18 months, with demand decreasing by 25 percent after the first 6 months.

This energy use would be necessary for the Modified Project, and the use of generators would be short-term and temporary. None of the proposed energy-consuming activities would be wasteful, inefficient, or unnecessary. Additionally, while the EIR/EIS discussed the use of a temporary PG&E service connection, the alternative use of generators was included in Section 2.5.3.4, Construction Power and Emergency Generators, of the EIR/EIS. Therefore, the use of these generators would be consistent with previously described activities. The Modified Project would not have a more significant impact on fuel and electrical energy requirements or local and regional energy supplies.

Page 80 of 147 ends

3. Discussion of Impacts

Vista Grande Drainage Basin Improvement Project 3-34 ESA / D200700036.01 EIR/EIS Addendum June 2025
Additionally, the permitting process for the Modified Project would require compliance with all applicable energy-saving policies and standards. As discussed in Section 3.7, Greenhouse Gas Emissions and Climate Change, of the EIR/EIS, the California Green Building Standards Code includes a mandatory set of minimum guidelines and more rigorous voluntary measures for energy efficiency and material conservation. Moreover, pursuant to the San Francisco Construction and Demolition Debris Recovery Ordinance, the Modified Project would be required to divert 65 percent of its construction and demolition debris from the landfill. Reusing this diverted debris instead of manufacturing new materials would reduce energy use. Therefore, there would be no impacts on efforts to achieve existing energy standards.

Conclusion
The Modified Project would not result in any new or more severe significant impacts than those identified in the certified EIR/EIS. (Same impact as previously approved project [no significant impacts].)

Page 81 of 147 ends

Vista Grande Drainage Basin Improvement Project 4-1 ESA / D200700036.01 EIR/EIS Addendum June 2025
SECTION 4
References and Report Preparers

4.1 References
BAAQMD (Bay Area Air Quality Management District). 2009. Revised Draft Options and Justification Report California Environmental Quality Act Thresholds of Significance.

October 2009. Available: http://www.baaqmd.gov/~/media/files/planning-and-research/ ceqa/revised-draft-ceqa-thresholds-justification-report-oct-2009.pdf?la=en. Accessed January 27, 2025.

BAAQMD (Bay Area Air Quality Management District). 2022. California Environmental Quality Act Air Quality Guidelines. Available: https://www.baaqmd.gov/plans-and- climate/california-environmental-quality-act-ceqa/updated-ceqa-guidelines. Accessed April 28, 2024.

CAL FIRE (California Department of Forestry and Fire Protection). 2024. Fire Hazard Severity Zones in State Responsibility Area. Available: https://calfire-forestry.maps.arcgis.com/apps/ webappviewer/index.html?id=988d431a42b242b29d89597ab693d008. Accessed November 14, 2024.

Caltrans (California Department of Transportation). 2013. Technical Noise Supplement to the Traffic Noise Analysis Protocol. September 2013. Available:
https://www.sandiegocounty.gov/content/dam/sdc/pds/ceqa/Soitec-Documents/Final-EIR- Files/references/rtcref/ch2.6/2014-12-19_Caltrans_TrafficNoiseAnalysisProtocol_Part1.pdf.

Accessed January 28, 2025.

CARB (California Air Resources Board). 2010. Staff Report: Initial Statement of Reasons for Proposed Rulemaking. October 2010. Available:
https://norcalblobstorage.blob.core.windows.net/stonestown/CARB_2010_StaffReportIniti alStatementofReasonsforProposedRulemaking.pdf. Accessed January 27, 2025.

EPA (U.S. Environmental Protection Agency). 2004. Regulatory Announcement: Clean Air Nonroad Diesel Rule. May 2004. Available: https://nepis.epa.gov/Exe/ZyPDF.cgi/ P10001RN.PDF?Dockey=P10001RN.PDF. Accessed January 27, 2025.

ESA (Environmental Science Associates). 2017. Vista Grande Drainage Basin Improvement Project EIR/EIS, State Clearinghouse No. 2013032001. Final. Prepared for the City of Daly City. August 2017.

ESA (Environmental Science Associates). 2024. Vista Grande Drainage Basin Improvement Project Area Baseline Vegetation Mapping. Prepared for the City of Daly City. September 5, 2024.

Page 82 of 147 ends

4. References and Report Preparers

Vista Grande Drainage Basin Improvement Project 4-2 ESA / D200700036.01 EIR/EIS Addendum June 2025
ESA (Environmental Science Associates). 2025. Memorandum: Monarch Butterfly Overwintering Survey of the Vista Grande Drainage Basin Improvement Project Habitat Restoration Sites. Prepared for the City of Daly City. March 7, 2025.

FTA (Federal Transit Administration). 2006. Transit Noise and Vibration Impact Assessment (FTA-VA-90-1003-06). May 2006. Available: https://www.transit.dot.gov/sites/fta.dot.gov/ files/docs/FTA_Noise_and_Vibration_Manual.pdf. Accessed January 28, 2025.

James, D.G. 2024. “Monarch Butterflies in Western North America: A Holistic Review of Population Trends, Ecology, Stressors, Resilience and Adaption.” Available:
https://www.mdpi.com/2075-4450/15/1/40. Accessed March 4, 2025.

Moffatt and Nichol. 2013. Vista Grande Drainage Basin Improvements. Preliminary Coastal Engineering Study, San Francisco, California. Prepared for the City of Daly City.

February 22, 2013.

SF Planning (San Francisco Planning). 2009. Map 1: Background Noise Levels – 2009. Available:
https://generalplan.sfplanning.org/images/I6.environmental/ENV_Map1_Background_Noise %20Levels.pdf. Accessed January 28, 2025.

SF Planning (San Francisco Planning). 2022. Lake Merced West Project Public Draft Environmental Impact Report. Adopted February 13, 2023.

SFPUC (San Francisco Public Utilities Commission). 2024. Lake Merced West Project. Available:
https://www.sfpuc.gov/construction-contracts/construction-projects/Lake_Merced_West.

Accessed November 18, 2024.

USFWS (U.S. Fish and Wildlife Service). 2024. “Endangered and Threatened Wildlife and Plants; Threatened Species Status with Section 4(d) Rule for Monarch Butterfly and Designation of Critical Habitat.” Proposed Rules. Federal Register Volume 89 (Number 239): Pages 100662–1000716. Thursday, December 12, 2024. Available:
https://www.govinfo.gov/content/pkg/FR-2024-12-12/pdf/2024-28855.pdf#page=1.

Accessed March 4, 2025.

Xerces Society (Xerces Society for Invertebrate Conservation). 2017. Map of Overwintering Sites. Available: https://westernmonarchcount.org/map-of-overwintering-sites/. Accessed March 4, 2025.

Xerces Society (Xerces Society for Invertebrate Conservation). 2024. Habitat Assessment Survey Instructions: Protocol for the Xerces Society’s Western Monarch Count. Available:
https://westernmonarchcount.org/wp-content/uploads/2024/11/WMC_Habitat- Assessment_Protocol_11-22-24.pdf. Accessed March 4, 2025.

Xerces Society et al. (Xerces Society for Invertebrate Conservation, U.S. Fish and Wildlife, Idaho Department of Fish and Game, and Washington Department of Fish and Wildlife). 2025.

Western Monarch Milkweed Mapper. Available: https://www.monarchmilkweedmapper.org.

Accessed March 4, 2025.

Page 83 of 147 ends

4. References and Report Preparers

Vista Grande Drainage Basin Improvement Project 4-3 ESA / D200700036.01 EIR/EIS Addendum June 2025

4.2 Lead Agency
City of Daly City
330 90th Street
Daly City, CA 94015
Anthony Tofiga Engineering Manager/Chief Engineer

4.3 Consultant
Environmental Science Associates
575 Market Street, Suite 3700
San Francisco, CA 94105
Alisa Moore Project Director
Darcy Kremin Project Manager
Rudy Reyes Deputy Project Manager
Chris Sanchez Air Quality & Acoustics Analyst
Eva Lin Biologist
Priya Finnemore Biologist
Rachel Haines Biologist
Wes McCullough GIS
Isaac Swanson Landscape Architect

Page 84 of 147 ends

4. References and Report Preparers

Vista Grande Drainage Basin Improvement Project 4-4 ESA / D200700036.01 EIR/EIS Addendum June 2025

This page intentionally left blank

Page 85 of 147 ends

City Council Meeting Agenda ReportItem # _____
Meeting Date: January 9, 2025
Subject: Setting Time and Place for a Public Hearing to Consider a Zone Change ZC 04-24- 16507 - Amendments to the Zoning Map Rezoning Parcels to be included in the existing -CC Commercial Cannabis Combining District
Recommended Action
Staff is requesting that the City Council set the time and place for a public hearing to consider Zone Change ZC 04-24-16507.

Background
The City of Daly City proposes amendments to the Zoning Map rezoning additional parcels to be included in the existing -CC Commercial Cannabis Combining District, where the retail of cannabis would be allowed “by-right,” without the requirement for a use permit. These parcels front on Mission Street between Crocker Avenue and Templeton Avenue, Geneva Avenue between Talbert Street and Bayshore Boulevard, and Geneva Avenue between Castillo Street and Calgary Street.

Summary/Conclusion
Staff recommends that the City Council set June 23, 2025, at 7:00 p.m. as the date and time for a public hearing to consider Zone Change ZC 04-24-16507.

Staff is available to provide any additional information desired by the Mayor or Council members.

Respectfully submitted,
Michael Van Lonkhuysen Tatum Mothershead
Planning Manager Director of Economic and Community
Development

Page 86 of 147 ends

City Council Meeting Agenda ReportItem # _____
Meeting Date: June 9, 2025
Subject: Approval of Application of Section 108 Loan Program for Financing Early Learning Center
Recommended Action
Staff recommends that the City Council approve an application for Section 108 Loan funds to help finance an Early Learning Center at 1401 Sullivan Avenue Background
In November of 2021 the City allocated $1,000,000 in America Rescue Plan Act funds for the purpose of developing a new childcare and early learning facility that would serve low-income Daly City families. Subsequently, the City applied for and was awarded $800,000 in Community Project Funding for the proposed childcare project. In addition, a total of $573,058 in Community Development Block Grant (CDBG) funds has been allocated to the project in its FY23-24 and FY24-25 Action Plans. The City has submitted its FY25-26 Action Plan, currently under HUD review, which allocates an additional $719,082 to the Early Learning Center (ELC).

In January of 2023 Council authorized the use of City-owned property located at 1401 Sullivan Avenue for the purpose of developing a 4,000 square foot early learning center and recognized the project as a capital project under the City’s Capital Improvement Plan. In addition, the Council approved a Memorandum of Understanding with Peninsula Family Services to operate the proposed center. The facility will be developed and owned by the City and leased to Peninsula Family Service whose experience in the operation of early learning programs utilizing General Child Care and Development (CCTR) funds from the State will enable them to serve households with incomes at or below 65 percent of the area median. In 2024, Peninsula Family Services was awarded $1.5 million through the California Child Care and Development Division Infrastructure Grant Program (CCDD- IGP) for the Daly City Early Learning Center.

In December of 2023 staff retained the firm of Dorman Associates, a recognized expert in childcare design, to carry out feasibility analysis and design of the new center, including evaluation of potential sites and preparation of design concepts for the proposed childcare facility. Following review of design alternatives with staff, the Dorman Associates contract was amended to include design of a larger, two-story building that would house an early learning center on the ground floor and an event center on the second floor. Dorman Associates’ current schematic designs envision a two-story building, in which the ground floor would house an early learning center serving up to 42 infants and toddlers in four classrooms with approximately 3,000 square feet of outdoor play space.

The second floor would serve as an event center of approximately 6,800 square feet. The second floor space would include meeting and event space large enough to accommodate up to 475 people.

The event center space could be utilized for activities such as trainings, official Daly City community events and meetings of non-profit organizations and municipal associations.

Page 87 of 147 ends

City Council Agenda Report June 9, 2025 Subject: Section 108 Loan Application for Child Care Center Page 3 of 3

The total estimated development cost for the proposed early learning/event center is $15.5 million, Approximately $9.3 million of the cost will be allocated to the childcare portion of the development.

This share is aligned with the proportion of the childcare center relative to the event center in terms of square footage. Considering funding from all sources currently committed to the project, there is a funding gap of $6.3 million for the early learning center.

Section 108 Loan Program

The Section 108 Loan Guarantee Program (Section 108) provides Community Development Block Grant (CDBG) recipients like Daly City with the ability to leverage their annual grant allocation to access low-cost, flexible financing for economic development, housing, public facility, and infrastructure projects. Communities can use Section 108 guaranteed loans to either finance specific projects or to launch loan funds to finance multiple projects over several years.

Local urban or state governments have direct access to the Section 108 Program. The Section 108 Program is typically used to fill a gap in the financing for larger development projects. Section 108 also often provides the security necessary to catalyze investment from private lenders.

The borrower is required to secure the loan by pledging current and future CDBG allocations to repay and secure the loan. In addition, the borrower will be required to pledge additional security for the loan. Additional security may include property liens, tax increment revenue, or other collateral. HUD is flexible and will work with local governments to identify proper collateral, including accepting a subordinated position behind the primary lender. The City has experience with the Section 108 Loan Program, having received a loan to help fund the construction of the Bayshore Community Center.

The current interest rate for a Section 108 loan is 5.4 percent with a 20-year term.

Discussion
A $3.2 million Section 108 loan would have annual payments of approximately $265,557. These payments would be made from the City’s annual allocation of CDBG funds. Loan repayment would become a part of the City’s Annual CDBG Action Plan.

Daly City currently receives approximately $932,468 in CDBG funds from HUD. Combined with program income and prior year unspent funds, total annual resources for CDBG activities in Daly City is typically about $1,300,000. Annual payments on a $3.2 million Section 108 loan would not affect the City’s ability to pay for other CDBG activities such as public services, housing rehabilitation and economic development.

If approved by the City Council, the Section 108 Loan Application will be submitted to HUD for review. Application review typically takes about six weeks. If the application is approved, development of loan documents and actual loan funding would take an additional three months.

Page 88 of 147 ends

City Council Agenda Report June 9, 2025 Subject: Section 108 Loan Application for Child Care Center Page 3 of 3

Fiscal Impact
Application for and execution of loan documents related to a Section 108 loan for the early learning center will have no General Fund impact. Loan repayment will be paid for with the City’s annual allocation of CDBG funds. Other sources to pay back the loan will be required if the CDBG program goes away.

Community Participation
Notice of Council consideration of the Section 108 loan application and availability of the draft application for public review was published in the Examiner on May 25, 2025. A copy of the draft application has been made available at the City Clerk’s Office, the Community Service Center, the City’s website and all Daly City libraries from May 25 through June 9, 2025. To date, staff has not received any comments from the public.

Recommendation
Staff recommends that Council approve the application for $3.2 million in Section 108 Loan Funding from HUD for the Early Learning Center.

Staff is available to provide any additional information desired by the Mayor or Councilmembers.

Respectfully submitted,
Lenelle Suliguin Tatum Mothershead
Housing and Community Director of Economic and Community Development Manager Development
Attachment: Draft Section 108 Loan Application

Page 89 of 147 ends
Page 90 of 147 ends
Page 91 of 147 ends
Page 92 of 147 ends
Page 93 of 147 ends
Page 94 of 147 ends
Page 95 of 147 ends
Page 96 of 147 ends
Page 97 of 147 ends
Page 98 of 147 ends
Page 99 of 147 ends
Page 100 of 147 ends
Page 101 of 147 ends
Page 102 of 147 ends
Page 103 of 147 ends
Page 104 of 147 ends
Page 105 of 147 ends
Page 106 of 147 ends
Page 107 of 147 ends
Page 108 of 147 ends
Page 109 of 147 ends
Page 110 of 147 ends
Page 111 of 147 ends
Page 112 of 147 ends
Page 113 of 147 ends
Page 114 of 147 ends
Page 115 of 147 ends
Page 116 of 147 ends
Page 117 of 147 ends

City Council Meeting Agenda ReportItem # _____
Meeting Date: June 9, 2025
Subject: Setting Time and Place of Public Hearing – Proposed Ordinance Amending Daly City Municipal Code Chapter 5.104 Re: Commercial Cannabis Regulations
Recommended Action
Staff recommends that the City Council set June 23, 2025, at 7:00 p.m. as the date and time for a public hearing – Ordinance amending Chapter 5.104 of the Daly City Municipal Code regarding Commercial Cannabis Regulations.

Background
In 2021, the City Council added Chapter 5.104 to Title 5 of the Daly City Municipal Code to adopt Commercial Cannabis Regulations to allow the operation and regulation of commercial cannabis operations in the City.

Discussion
The City Council provided direction to staff to revise the Commercial Cannabis Regulations in order to address equity and to expand the operations within the current Commercial Cannabis Zoning Districts.

Fiscal Impact
None
Summary/Conclusion
Set a public hearing on proposed ordinance amending Chapter 5.104 of the Daly City Municipal Code regarding Commercial Cannabis Regulations for June 23, 2025, at 7:00 p.m. in the City Council Chambers.

Staff is available to provide any additional information desired by the Mayor or Councilmembers.

Respectfully submitted,
Maybelle Manio
Economic and Community Development Specialist

Page 118 of 147 ends

Council Agenda Report Item # Meeting Date: June 9, 2025
Subject: Adoption of Comprehensive Biennial Operating and Capital Budgets for Fiscal Year 2026 and Fiscal Year 2027
Recommended Action
Adoption of the Comprehensive Biennial Operating and Capital Budgets for Fiscal Year (FY) 2026 and FY 2027.

Discussion
Due to the COVID-19 pandemic and ongoing economic uncertainties, the City switched to a one- year budget cycle starting in FY 2021. Since then, staff has continued to monitor and evaluate the economic climate and has opted to return to the two-year Comprehensive Biennial Operating and Capital Budget structure for the FY 2026 and FY 2027 budget.

Operating Budget
The Finance Department, in conjunction with each of the City Departments, developed the FY 2026 and FY 2027 Proposed Operating Budget by carefully reviewing revenues and expenditures in previous and current fiscal years to forecast the needs for FY 2026 and FY 2027. Additionally, City staff held three Budget Study Sessions on March 8, 2025, April 7, 2025 and April 28, 2025, and presented the budget to Council in a fourth meeting on May 27, 2025, in which the City Council provided direction to staff on what priorities to include in the creation of the FY 2026 and FY 2027 budget. Although Departmental budget increases had been minimized in each budget area, Finance staff found, during the development of the budget, that projected expenditures were estimating higher than projected revenues. With the recommended adoption of the FY 2026 and FY 2027 Operating Budget, the General Fund reserve level would remain above the preferred reserve level of 3 months set by the City Council.

City staff recommends that the City Council adopt budgets for all the City funds including the General Fund, the Enterprise Funds, and all other non-General Funds. First, the overall operating budget for General Fund revenues for FY 2026 is recommended to be $121,941,602, and the overall operating budget for General Fund expenditures is recommended to be $129,340,031 with an additional $500,000 budgeted for capital improvement project contributions for a total general fund expenditure budget of $129,840,031. This includes a $49k increase to the department of Economic and Community Development budget due to recommended operational changes from the Land Management Assessment study. This equates to a budgeted General Fund deficit of $7,898,429. The overall operating budget for General Fund revenues for FY 2027 is recommended to be $125,518,341, and the overall operating budget for General Fund expenditures is recommended to be $133,780,654 with an additional $500,000 budgeted for capital improvement project contributions for a total general fund expenditure budget of $134,280,654. This equates to a budgeted General Fund deficit of $8,762,313.

Page 119 of 147 ends

City Council Agenda Report
Adoption of Comprehensive Biennial Operating and Capital Budgets for Fiscal Year 2026 and Fiscal Year 2027
Meeting Date: June 9, 2025

Page 2 of 5 ends

General Fund
FY 2026 FY 2027
Operating Revenues $ 121,941,602 $ 125,518,341
Operating Expenditures $ 129,340,031 $ 133,780,654
Operating Surplus/(Deficit) $ (7,398,429) $ (8,262,313) Capital Improvement Contribution $ 500,000 $ 500,000 Total Surplus/(Deficit) $ (7,898,429) $ (8,762,313) With regards to the Enterprise Funds, the operating budget for the Water Fund revenues for FY 2026 is recommended to be $33,012,585 and the operating budget for expenditures for the Water Fund is recommended to be $25,567,822 with an additional $2,600,000 budget for capital improvement projects for a total expenditure budget of $28,167,822 equating to a budgeted surplus of $4,844,763.

For FY 2027, the Water Fund revenues is recommended to be $34,312,031 and the operating budget for expenditures for the Water Fund is recommended to be $26,199,339 with an additional $5,100,000 budget for capital improvement projects for a total expenditure budget of $31,299,339 equating to a budgeted surplus of $3,012,692.

The Sanitation Fund operating budget for revenues for FY 2026 is recommended to be $34,911,294, and the operating budget for expenditures for the Sanitation Fund are recommended to be $36,487,316 with an additional $5,050,000 budget for capital improvement projects for a total expenditure budget request of $41,537,316 equating to a budgeted deficit of $6,626,022. For FY 2027, the Sanitation Fund revenues is recommended to be $35,941,202 and the operating budget for expenditures for the Water Fund is recommended to be $37,029,613 with an additional $4,700,000 budget for capital improvement projects for a total expenditure budget of $41,729,613 equating to a budgeted deficit of $5,788,411.

The total operating budget for revenues in the Major and Minor Funds for FY 2026 is recommended to be $53,176,210, and the total Major and Minor Funds operating budget for expenditures is recommended to be $48,253,083. For FY 2027, for the Major and Minor funds operating revenues for FY 2027 it is recommended to be $50,861,989 and the total Major and Minor Funds operating budget for expenditures is recommended to be $46,659,280. The overall City-wide operating revenues budget for FY 2026 is recommended to be $243,041,691, and the City-wide operating expenditures budget is recommended to be $240,148,252. The overall City-wide operating revenues budget for FY 2027 is recommended to be $246,633,563, and the City-wide operating expenditures budget is recommended to be $244,168,886 The detail of the recommended City-wide Operating Budget for FY 2026 and FY 2027 can be found in Attachment A.

As part of the General Fund operating budgets outlined above, staff recommends that the previously approved Measure Q funded programs continue in FY 2026 and FY 2027. These programs include staffing Fire Engine 95, Community Wellness and Crisis Response Team Program, Body Worn and Patrol Vehicle Camera Program, Unmanned Aerial Systems, Automated License Plate Readers, and Library and Recreation programs. This includes 9 FTE in Fire, 3 FTE along with the equivalent of

Page 120 of 147 ends

City Council Agenda Report
Adoption of Comprehensive Biennial Operating and Capital Budgets for Fiscal Year 2026 and Fiscal Year 2027
Meeting Date: June 9, 2025

Page 3 of 5 ends

0.8 FTE in hourly positions in Library, and 4 FTE along with the equivalent of 2.7 FTE in hourly positions in Recreation. This results in 16 FTE and the equivalent of 3.5 FTE in hourly positions for an equivalent of 19.5 FTE. It is being requested to add the Data Aggregation Platform program in FY 2027 which would add an additional $132,000 to the overall request. The total for the existing programs costs and the addition of the Data Aggregation Platform program results in budgeted Measure Q expenditures totaling $5,452,280 in FY 2026 and $6,501,688 in FY 2027.

Staffing Changes
During the FY 2026 and FY 2027 budget process, staff identified positional changes that were needed to better align to department needs. As part of the budget recommendations, staff recommended amending the following budgeted positions: This would result in three (3) net new positions in the general fund.

FY 2026 Staffing Changes:
•Add one (1) Human Resources Analyst and maintain at Range U058 of the Miscellaneous/Unrepresented salary schedule.
•Add one (1) Economic Development Program Manager and assign to Range U098 of the Miscellaneous/Unrepresented salary schedule.
•Adjust one (1) Assistant City Manager salary range from M452 to M480 of the Executive Management salary schedule.

Range STEP 1 STEP 2 STEP 3 STEP 4 STEP 5
M 480 11,196.02 11,755.82 12,343.61 12,960.79 13,608.83 •Reclassify one (1) Office Assistant III with Deputy City Clerk and assign to Range U040 of the Miscellaneous/Unrepresented salary schedule.
•Adjust one (1) Assistant City Clerk salary range from U047 to U056 of the Miscellaneous/Unrepresented salary schedule.
•Reclassify one (1) Office Assistant I/II with Building Permit Technician and maintain at Range X037 of the AFSCME salary schedule.
•Reclassify one (1) Associate Planner with Senior Planner and maintain at Range U077 of the Miscellaneous/Unrepresented salary schedule.
•Reclassify one (1) Financial Services Manager with Senior Financial Services Manager and assign to Range U102 of the Miscellaneous/Unrepresented salary schedule. •Adjust one (1) Senior Police Assistant salary range from D027 to D030 of the Teamsters Local 856 Police Assistants salary schedule.

Page 121 of 147 ends

City Council Agenda Report
Adoption of Comprehensive Biennial Operating and Capital Budgets for Fiscal Year 2026 and Fiscal Year 2027
Meeting Date: June 9, 2025

Page 4 of 5 ends

•Adjust one (1) GIS Coordinator salary range from U065 to U068 effective July 1, 2025 and adjust to Range U070 effective July 1, 2026 of the Miscellaneous/Unrepresented salary schedule.
•Add one (1) Public Works Superintendent and maintain at Range U089 of the Miscellaneous/Unrepresented salary schedule.
•Reclassify one (1) Project Development Coordinator and one (1) Environmental Resources and Compliance Inspector to two (2) Environmental Compliance and Water Resources Specialists and assign to Range U065 of the Miscellaneous/Unrepresented salary schedule. •Reclassify two (2) Plant and Equipment Maintenance Mechanics to two (2) Senior Plant and Equipment Maintenance Mechanics and assign to Range P052 of the Local 39 Operating Engineers Plant Maintenance Unit salary schedule.
•Reclassify two (2) Office Assistant I/IIs with two (2) Office Assistant IIIs and maintain at Range Z030 of the Teamsters Clerical salary schedule.
•Add one (1) Collection System Field Supervisor and maintain at Range U053 of the Miscellaneous/ Unrepresented salary schedule.

Capital Budget
In addition to the City-wide operating revenue and expenditure budget requests, staff is recommending the adoption of Capital Project expenditures totaling $2,600,00 from the Water Fund, $5,050,000 from the Sanitation Fund and $8,995,000 from various funding sources for General Capital Projects for an overall capital budget total of $16,645,000 in FY 2026. The proposed Capital Project budget includes 9 Water projects, 10 Sanitation projects, and 12 General Capital Projects for various Traffic and Transportation, Facilities, and Mussel Rock. Of the 12 General Capital Projects, 1 is to be funded with General Fund contributions for a total of $500,000. The remaining projects will utilize Measure A, Measure W, Measure M, SB-1 RMRA Gas Tax, and Solid Waste Franchise Fees.

Staff is recommending the adoption of Capital Project expenditures for FY 2027 totaling $5,100,000 from the Water Fund, $4,700,000 from the Sanitation Fund and $7,886,000 from various funding sources for General Capital Projects for an overall capital budget total of $17,686,000. The proposed Capital Project budget includes 11 Water projects, 8 Sanitation projects, and 12 General Capital Projects for various Traffic and Transportation, Facilities, and Mussel Rock. Of the 12 General Capital Projects, 1 is to be funded with General Fund contributions for a total of $500,000. The remaining projects will utilize Measure A, Measure W, Measure M, SB-1 RMRA Gas Tax, and Solid Waste Franchise Fees.

The detail of the recommended Capital Improvement Budget for FY 2026 and FY 2027 can be found in Attachment B.

Page 122 of 147 ends

City Council Agenda Report
Adoption of Comprehensive Biennial Operating and Capital Budgets for Fiscal Year 2026 and Fiscal Year 2027
Meeting Date: June 9, 2025

Page 5 of 5 ends

Summary/Conclusion
Staff recommends that the City Council adopt the Comprehensive Biennial Operating and Capital Budgets for Fiscal Year 2026 and FY 2027.

Staff is available to provide any additional information desired by the Mayor or Council.

Respectfully submitted,

Timothy J. Nevin Thomas J Piccolotti Director of Finance and City Manager Administrative Services
Attachment A: Proposed Operating Budget for Fiscal Year 2026 and Fiscal Year 2027 Attachment B: Proposed Capital Improvement Program Budget for Fiscal Year 2026 and Fiscal Year 2027

Page 123 of 147 ends

Attachment A: Proposed Operating Budget for Fiscal Year 2026 and Fiscal Year 2027 ACTUAL ACTUAL BUDGET REQUESTED % Change REQUESTED % Change GENERAL FUND 2023 2024 2025 2026 2027
City Attorney
City Attorney 1,469,045 1,542,189 1,582,968 1,718,165 9% 1,728,827 1% Measure Q - City Attorney - - 500,000 - -100% - 0% Total City Attorney 1,469,045 1,542,189 2,082,968 1,718,165 -18% 1,728,827 1% City Clerk 858,331 705,678 935,053 811,818 -13% 1,027,572 27% City Council 354,519 388,037 442,729 531,843 20% 477,470 -10% City Manager
City Manager Administration 1,931,924 1,935,460 2,878,883 3,483,021 21% 3,506,466 1% Community Sustainability 21,945 15,932 114,149 122,800 8% 122,800 0% Community Service Center 56,033 37,108 36,144 2,163 -94% 2,344 8% Economic Development - - - 473,938 100% 492,558 4% Total City Manager 2,009,902 1,988,501 3,029,176 4,081,922 35% 4,124,168 1% City Treasurer 44,842 62,766 71,320 70,205 -2% 70,747 1% Economic & Community Development
Administration 945,522 1,269,267 1,018,411 613,683 -40% 609,315 -1% C&D Support Services 4,706 8,414 480,974 8,000 -98% 8,000 0% Planning & Zoning 1,184,235 1,248,635 1,489,017 1,286,361 -14% 1,296,918 1% Building 2,048,369 2,205,753 2,421,109 2,514,745 4% 2,563,836 2% Code Enforcement 622,555 637,982 851,729 773,701 -9% 801,779 4% RDA Successor Agency 3,698
3,750 3,917 4,098 5% 4,254 4% Total Economic & Community Devel 4,809,084 5,373,801 6,265,158 5,200,588 -17% 5,284,102 2% Finance-Admin/Accounting 3,688,524 3,534,058 4,321,146 4,176,541 -3% 4,201,346 1% Fire
Fire Services 26,921,975 29,339,312 27,765,244 29,308,389 6% 29,590,295 1% Measure Q- Fire 3,351,191 3,077,766 2,956,230 3,066,398 4% 3,112,807 2% Total Fire 30,273,167 32,417,078 30,721,474 32,374,787 5% 32,703,102 1% Human Resources 1,601,114 1,591,815 1,959,957 2,079,519 6% 2,041,246 -2% Library
Library 4,315,160 4,395,220 5,189,848 5,072,628 -2% 5,108,415 1% Measure Q - Library 374,082 454,180 528,478 557,112 5% 565,359 1% Total Library 4,689,243 4,849,400 5,718,326 5,629,740 -2% 5,673,774 1% Police
Police Services 40,018,652 41,553,666 49,357,957 49,459,681 0% 50,536,823 2% Measure Q - Police 403,459
648,347 1,202,371 1,044,382 -13% 2,030,837 94% Total Police 40,422,112 42,202,013 50,560,328 50,504,063 0% 52,567,660 4% Public Works
Administration 533,548 740,600 887,301 804,311 -9% 816,199 1% Engineering 2,318,264 2,088,127 3,340,405 3,378,113 1% 3,473,715 3% Parks Maintenance 3,355,258 3,747,875 3,995,837 4,241,791 6% 4,340,276 2% Supplemental Interfund Transfer 1,690,563 2,142,284 2,347,734 2,985,769 27% 3,026,914 1% Total Public Works 7,897,633 8,718,886 10,571,277 11,409,984 8% 11,657,105 2% Recreation
Recreation 9,604,723 10,567,307 12,343,673 11,077,432 -10% 11,440,344 3% Measure Q-Recreation 574,208 795,125 767,741 784,387 2% 792,685 1% Total Recreation 10,178,930 11,362,432 13,111,414 11,861,819 -10% 12,233,029 3% Nondepartmental* 5,551,567 14,261,606 5,549,897 (610,963) -111% 490,506 -180% TOTAL GENERAL FUND 113,848,012$ 128,998,259$ 135,340,225$ 129,840,031$ -4% 134,280,654$ 3%

C I T Y O F D A L Y C I T Y

COMPARISON OF EXPENDITURE BUDGETS
1 of 4

Page 124 of 147 ends

Attachment A: Proposed Operating Budget for Fiscal Year 2026 and Fiscal Year 2027 ACTUAL ACTUAL BUDGET REQUESTED % Change REQUESTED % Change 2023 2024 2025 2026 2027

SPECIAL REVENUE
City Loan Repayment 1,235,632 1,285,294 1,326,627 1,390,691 5% 1,446,571 4% Housing Agency
Housing Finance Agency 87,912 521,320 5,954,985 2,113,050 -65% 113,050 -95% 20% Housing Set Aside 131,945
202,199 781,536 905,645 16% 919,117 1% Total Housing Agency 219,857 723,519 6,736,521 3,018,695 -55% 1,032,167 -66% Community Block Grant: 1,966,383 829,914 1,881,154 - -100% - 0% Linda Vista Benefit Assessment 24,401 23,170 29,830 29,830 0% 29,830 0% Traffic Safety 17,967 10,930 33,543 50,500 51% 50,500 0% Traffic Enforcement - - 685,796 690,410 1% - -100% Grants 1,648,846 2,836,150 11,381,430 300,000 -97% 300,000 0% Special Deposits 4,700 5,945 6,500 6,500 0% 6,500 0% Redevelopment - J.S./Mission - - - - 0% - 0% Redevelopment - Bayshore 59,414 9,710 37,300 37,300 0% 37,300 0% TOTAL SPECIAL REVENUE 5,177,201$ 5,724,632$ 22,118,700$ 5,523,926$ -75% 2,902,868$ -47% CAPITAL PROJECTS*
Transportation (Gas Tax) 10,860,027 14,783,037 46,252,550 7,170,988 -84% 7,294,442 2% Measure A 944,511 2,722,468 12,112,934 3,000 -100% 3,200 7% Measure W 915,214 746,614 3,553,750 3,000 -100% 3,200 7% AB1600 436,089 264,048 3,824,804 - -100% - 0% Capital Outlay 2,534,323 6,563,643 40,764,611 - -100% - 0% Major Facility Improvements 469,182 1,717,380 9,829,430 - -100% - 0% TOTAL CAPITAL PROJECTS 16,159,346$ 26,797,191$ 116,338,079$ 7,176,988$ -94% 7,300,842$ 2% ENTERPRISE*
Water Utility 22,807,447 24,774,588 46,563,511 25,567,822 -45% 26,199,339 2% Civic Center 1,034,109 1,438,224 1,347,703 1,160,470 -14% 1,193,413 3% Transfer Station 114,580 120,309 185,274 250,285 35% 195,496 -22% Sanitation District 31,769,346 35,035,746 53,092,470 36,487,316 -31% 37,029,613 1% TOTAL ENTERPRISE 55,725,482$ 61,368,867$ 101,188,957$ 63,465,893$ -37% 64,617,861$ 2%

INTERNAL SERVICE FUNDS
Pension Bonds 1,473,293 236,252 - - 0% - 0% Motor Vehicles 5,935,941 6,653,776 12,809,555 11,131,496 -13% 11,281,052 1% Central Services 256,716 271,154 300,019 277,416 -8% 295,685 7% PBX - Telephones 253,401 357,553 224,259 229,121 2% 229,346 0% Building Maintenance 5,806,649 5,528,388 7,033,757 7,160,742 2% 7,275,192 2% Information Services 4,347,510 3,574,028 7,816,737 4,783,089 -39% 4,711,899 -1% Retiree Health - - - - 0% - 0% Pension UAL Fund - - - - 0% - 0% Self Insurance 6,936,536
8,819,658 10,485,414 10,559,549 1% 11,273,488 7% TOTAL INTERNAL SERVICE 25,010,045$ 25,440,808$ 38,669,741$ 34,141,414$ -12% 35,066,662$ 3% COMBINED EXPENDITURE TOTAL 215,920,086$ 248,329,758$ 413,655,702$ 240,148,252$ -42% 244,168,886$ 2% * FY 2023, 2024 and 2025 include funding for capital projects.

C I T Y O F D A L Y C I T Y

COMPARISON OF EXPENDITURE BUDGETS
2 of 4

Page 125 of 147 ends

Attachment A: Proposed Operating Budget for Fiscal Year 2026 and Fiscal Year 2027 ACTUAL ACTUAL BUDGET REQUESTED % Change REQUESTED % Change GENERAL FUND 2023 2024 2025 2026 2027
Property Tax
Property Tax 34,566,846 42,409,543 39,408,371 42,171,784 7% 44,314,089 5% Vehicle License Fee 15,125,990 9,993,977 12,600,000 9,000,000 -29% 9,000,000 0% Total Property Tax 49,692,836 52,403,520 52,008,371 51,171,784 -2% 53,314,089 4% Sales Tax
General Sales Tax 17,069,005 17,650,149 17,093,700 18,215,500 7% 18,576,600 2% Measure Q 8,705,750
8,805,822 8,594,000 8,971,000 4% 9,184,000 2% Total Sales Tax 25,774,755 26,455,971 25,687,700 27,186,500 6% 27,760,600 2% Utility Users Tax 6,934,379 7,095,237 6,063,335 7,776,800 28% 8,305,186 7% Franchise Fees 5,016,119 5,166,543 5,430,734 5,189,606 -4% 5,195,304 0% Business License Taxes 5,784,521 6,672,917 6,445,920 6,694,400 4% 6,983,388 4% Other Taxes 1,686,355 1,784,738 1,812,803 2,139,000 18% 2,239,000 5% Licenses and Permits 2,672,412 2,587,982 2,575,635 2,543,000 -1% 2,543,000 0% Fines and Forfeitures 2,617,133 2,403,018 2,075,867 2,249,120 8% 2,337,320 4% Rents and Interest 3,078,457 3,442,310 2,657,651 3,879,679 46% 3,778,246 -3% From Other Agencies** 7,590,929 7,757,770 4,248,117 1,260,000 -70% 1,010,000 -20% Charges and Fees 5,107,784 5,918,059 5,696,331 5,366,726 -6% 5,409,426 1% Program Fees 1,407,217 1,754,198 2,043,179 1,580,040 -23% 1,597,613 1% Miscellaneous 1,422,212 1,248,506 611,196 608,475 0% 608,475 0% Interfund Transfers 4,473,353 4,260,468 4,420,693 4,296,473 -3% 4,436,695 3% TOTAL GENERAL FUND 123,258,462$ 128,951,238$ 121,777,532$ 121,941,602$ 0% 125,518,341$ 3%

SPECIAL REVENUE
City Loan Repayment - - - - 0% - 0% Housing Agency
Housing Finance Authority 164,569 738,683 1,697,204 3,526,139 108% 51,500 -99% 20% Housing Set Aside 259,883 325,388 262,059 262,000 0% 262,000 0% Total Housing Agency 424,453 1,064,071 1,959,263 3,788,139 93% 313,500 -92% Community Block Grant: 1,966,383 829,914 1,881,154 - -100% - 0% Linda Vista Benefit Assessment 54,845 91,672 47,380 47,381 0% 47,381 0% Traffic Safety 33,360 24,423 16,632 21,240 28% 21,240 0% Traffic Enforcement 11,609 5,088 1,000 1,500 50% 1,000 -33% Grants 918,073 2,957,714 11,393,930 320,500 -97% 320,500 0% Special Deposits 18,592 24,702 13,500 8,800 -35% 8,800 0% Redevelopment - J.S./Mission 1,235,632 1,285,294 - - 0% - 0% Redevelopment - Bayshore 74,205 18,590 40,800 40,800 0% 40,800 0% TOTAL SPECIAL REVENUE 4,737,150$ 6,301,468$ 15,353,659$ 4,228,360$ -72% 753,221$ -82%

CAPITAL PROJECTS
Transportation (Gas Tax) 10,713,383 14,653,607 48,791,283 10,115,774 -79% 10,288,954 2% Measure A 2,903,581 3,406,317 2,685,000 2,834,650 6% 2,916,690 3% Measure W 1,284,865 1,358,658 1,190,000 1,255,400 5% 1,291,862 3% AB1600 289,589 699,863 566,723 565,000 0% 565,000 0% Capital Outlay 4,813,048 6,710,806 42,721,084 2,021,473 -95% 2,021,473 0% Major Facility Improvements 221,966
8,962,160 - 250,000 100% 250,000 0% TOTAL CAPITAL PROJECTS 20,226,431$ 35,791,411$ 95,954,090$ 17,042,297$ -82% 17,333,979$ 2% **Includes one time ARPA revenue

COMPARISON OF REVENUE BUDGETS

C I T Y O F D A L Y C I T Y
3 of 4

Page 126 of 147 ends

Attachment A: Proposed Operating Budget for Fiscal Year 2026 and Fiscal Year 2027 ACTUAL ACTUAL BUDGET REQUESTED % Change REQUESTED % Change ENTERPRISE 2023 2024 2025 2026 2027
Water Utility 29,409,352 32,725,290 54,349,719 33,012,585 -39% 34,312,031 4% Civic Center 1,433,157 1,539,316 1,140,897 1,196,493 5% 1,228,255 3% Transfer Station 114,580 114,580 185,274 237,602 28% 177,602 -25% Sanitation District 33,452,429 34,890,460 52,361,759 34,911,294 -33% 35,941,202 3% TOTAL ENTERPRISE 64,409,518$ 69,269,646$ 108,037,650$ 69,357,973$ -36% 71,659,091$ 3%

INTERNAL SERVICE FUNDS
Pension Bonds 5,018,067 5,361,957 - - 0% - 0% Motor Vehicles 7,188,380 8,355,643 7,777,326 9,246,267 19% 9,535,152 3% Central Services 297,610 297,974 278,428 261,265 -6% 280,248 7% PBX - Telephones 308,548 347,647 321,640 319,988 -1% 329,348 3% Building Maintenance 6,162,299 6,505,284 6,532,562 5,556,524 -15% 5,808,906 5% Information Services 3,768,439 4,257,654 6,802,650 5,061,325 -26% 4,493,670 -11% Retiree Health - - - - 0% - 0% Pension UAL Fund 2,000,000 1,084,535 - - 0% - 0% Self Insurance 9,774,064 11,453,287 9,113,706 10,026,090 10% 10,921,607 9% TOTAL INTERNAL SERVICE 34,517,407$ 37,663,982$ 30,826,312$ 30,471,459$ -1% 31,368,932$ 3% COMBINED REVENUE TOTAL 247,148,968$ 277,977,744$ 371,949,242$ 243,041,691$ -35% 246,633,563$ 1%

C I T Y O F D A L Y C I T Y

COMPARISON OF REVENUE BUDGETS
4 of 4

Page 127 of 147 ends

Attachment B: Proposed Capital Improvement Program Budget for Fiscal Year 2026 and Fiscal Year 2027 Status Type Project Name Funding Type FY 2026 Request FY 2027 Request New Facilities PARKING METER UPGRADE General Fund 500,000 500,000 Existing Mussel Rock Mussel Rock Landfill Sire Maintenance Solid Waste Franchise Fee 200,000 200,000 Existing Mussel Rock Mussel Rock Site Routine Monitoring Solid Waste Franchise Fee 185,000 190,000 Existing Traffic and Transportation Cooperative Project Development Measure A 75,000 78,000 Existing Traffic and Transportation Ro 460 Northridge Streetlight Conversion Measure A 1,460,000 - Existing Traffic and Transportation Crosswalk Improvements Measure A - 200,000 Existing Traffic and Transportation Signal/Streetlight Improvements Measure A 160,000 165,000 Existing Traffic and Transportation Street Resurfacing (2025-26) Measure A. Measure W, SB-1 1,935,000 - Existing Traffic and Transportation Vision Zero Improvements Measure A 200,000 - New Traffic and Transportation Ada Barrier Removal Project (2026-27) Measure A - 162,000 New Traffic and Transportation Ada/Sidewalk Improvements (2025-26) Measure A 162,000 - New Traffic and Transportation Ada/Sidewalk Improvements (2026-27) Measure A - 167,000 New Traffic and Transportation Bayshore And Woodrow Wilson Safe Routes To School Measure A - 405,000 New Traffic and Transportation Street Resurfacing (2026-27) Measure A, Measure W 375,000 1,226,000 New Traffic and Transportation Street Resurfacing (2027-28) Measure A - 393,000 Existing Traffic and Transportation St. Francis Heights Street Slurry Seal Measure M, Measure W, SB-1 - 4,200,000 Existing Traffic and Transportation Bayshore Street Slurry Seal Measure M, SB-1 2,614,000 - Existing Traffic and Transportation Westlake Street Slurry Seal Measure W 1,129,000 - Existing Sanitation Resurface S/S Streets Sanitation Fund 400,000 400,000 Existing Sanitation Headworks 1 Fine Screen Replacement Sanitation Fund 300,000 - Existing Sanitation Sewer Main Rehabilitation/Improvements Sanitation Fund 200,000 200,000 Existing Sanitation Sewer Lift Station Rehab/Replacement Sanitation Fund 250,000 250,000 Existing Sanitation Vehicle Upgrades Sanitation Fund 50,000 - Existing Sanitation Plant Process Improvements Sanitation Fund 350,000 350,000 Existing Sanitation Plant Structure Improvements Sanitation Fund 200,000 200,000 Existing Sanitation Treatment Plant Air Scrubbers Sanitation Fund 300,000 300,000 Existing Sanitation Treatment Plant Electrical Upgrade Sanitation Fund 500,000 500,000 Existing Sanitation SSMP/Master Plan - System Improvements Sanitation Fund 2,500,000 2,500,000 FY 2026 and FY 2027 Capital Improvement Budget Request
1 of 2

Page 128 of 147 ends

Attachment B: Proposed Capital Improvement Program Budget for Fiscal Year 2026 and Fiscal Year 2027 Status Type Project Name Funding Type FY 2026 Request FY 2027 Request Existing Water Street Resurfacing Water Mains Water Fund 200,000 200,000 Existing Water Pressure Reducing Valve Replacements Water Fund 100,000 100,000 Existing Water Well Rehabilitation Water Fund 150,000 150,000 Existing Water Reservoir Fencing Water Fund 100,000 100,000 Existing Water Water Plant Improvements Water Fund 250,000 250,000 Existing Water Scada System Upgrade Water Fund 150,000 150,000 Existing Water Hydropneumatic Tank Replacements Water Fund 100,000 100,000 Existing Water Equipment - Pick Up Truck Water Fund 50,000 50,000 Existing Water Citrus Pump Station Replacement Water Fund - 2,000,000 Existing Water Main Rehab/Improvements Water Fund 1,500,000 1,000,000 Existing Water Westlake Electrical Upgrade Water Fund - 1,000,000 16,645,000 17,686,000
FY 2026 and FY 2027 Capital Improvement Budget Request
Total
2 of 2

Page 129 of 147 ends

City Council Agenda ReportItem # _____
Meeting Date: June 9, 2025
Subject: Re-Appointment of Daly City Bicycle-Pedestrian Advisory Committee Members
Recommended Action
Staff recommends that the City Council approve the re-appointment of Melinda Hue, Kathleen Gilbert and Fernando Montanes to a two-year term on the Daly City Bicycle-Pedestrian Advisory Committee (DC-BPAC) expiring on June 30, 2027.

Background
The Daly City Bicycle/Pedestrian Advisory Committee meets quarterly to review proposed pedestrian/bikeway improvement projects, project funding applications and to provide input on existing roadway/bikeway conditions affecting pedestrian and cycling activities in Daly City.

Meetings are typically held quarterly the first Wednesday of January, April, July and October at City Hall. The members are appointed for a renewable two-year term. Existing and past members included bicycle and walking enthusiasts, students, workers and commuters. Volunteers must live or work in Daly City to serve on the DC-BPAC. The Bicycle/Pedestrian Advisory Committee is supported by Public Works Engineering Division personnel who prepare meeting agendas and reports for the committee’s consideration.

The DC-BPAC bylaws approved in December of 2002 established a seven member committee with the terms for the first half of the members expiring on an even number year and the terms for the remaining half of the members expiring on an odd number year.

Discussion
The Committee consists of up to seven (7) voting members approved by the City Council. Current members include:

Member Term Expiration
Melinda Hue June 30, 2025
Kathleen Gilbert June 30, 2025
Fernando Montanes June 30, 2025
Rachel Goodman June 30, 2026
Henry Martinez June 30, 2026
Natasha Opfell June 30, 2026
Alan Uy June 30, 2026
Staff recommends the re-appointment of Melinda Hue, Kathleen Gilbert and Fernando Montanes to a two-year term expiring on June 30, 2027.

Page 130 of 147 ends

Re-Appointment of Daly City Bicycle-Pedestrian
Advisory Committee Members
Meeting Date: June 9, 2025

Page 2 of 2 ends

Melinda Hue works for the City of Redwood City as an urban planner and is interested in making Daly City more accessible for pedestrians. She grew up in Daly City and was able to get around without a car. She hopes her son will be able to experience the same when he grows up. She has lived in Daly City for approximately 16 years and was initially appointed to the DC-BPAC in January 2019.

Kathleen Gilbert is a retired transit manager, having worked for both San Francisco MUNI and BART. She previously served on the SamTrans Citizens Advisory Board. Kathleen is interested in getting involved with issues impacting older and disabled people. She has lived in Daly City for over 30 years and was initially appointed to the DC-BPAC in June 2022.

Fernando Montanes is a student at San Francisco State University who is an avid walker and relies heavily on public transportation. He works in Daly City and has lived in Daly City for 19 years. He also serves on the Board for Kapwa Kultural Center working with Daly City youth and college students.

Fiscal Impact
There is no additional fiscal impact associated with the recommended action. The only fiscal impact of the Daly City Bicycle/Pedestrian Advisory Committee is the Public Works support staff salary cost and minimal document reproduction costs. Funding is available for staff’s time in the Public Works - Engineering Division operating budget 01-312-311-4241 for the Fiscal Year 2025-26.

Summary/Conclusion
Recommend the City Council approve the re-appointment of Melinda Hue, Kathleen Gilbert and Fernando Montanes to a two-year term on the DC-BPAC expiring on June 30, 2027.

Staff is available to provide any additional information desired by the Mayor or Councilmembers.

Respectfully submitted,
Shirley Chan Richard Chiu, Jr.

Traffic Engineer Director of Public Works

Page 131 of 147 ends

City Council Agenda ReportItem # _____

Meeting Date: June 9, 2025
Subject: Authorization to Apply to the Housing Incentive Pool Grant Program for the John Daly Boulevard Pedestrian and Bicycle Facility Improvements Project Recommended Action
Staff recommends that the City Council:

1. Authorize the City Manager to submit an application to the Metropolitan Transportation Commission’s Housing Incentive Pool grant program for the John Daly Boulevard Pedestrian and Bicycle Facility Improvements Project;

2. Authorize the City Manager, or his designee, to accept and appropriate up to $1,304,000 in Housing Incentive Pool grant funds and execute any necessary funding agreements; and

3. Appropriate $168,948 of unallocated Measure A funds for the local match.

Background
Established by the Metropolitan Transportation Commission (MTC) in 2018, the Housing Incentive Pool (HIP) is a program administered by MTC that provides federal transportation funding to local jurisdictions. Through HIP, MTC aimed to make progress on the San Francisco Bay Area’s affordable housing targets by leveraging transportation funding and incentivizing local jurisdictions to build more affordable housing units. MTC will distribute $71 million in HIP grants to the region’s top 15 jurisdictions that produced and preserved the most qualifying affordable housing units in between 2018 and 2022. The $71 million that comprise the HIP program funds are a mix of federal Surface Transportation Program (STP), Congestion Mitigation and Air Quality (CMAQ), and State Transportation Improvement Program (STIP) funds. All HIP funds must be used for transportation purposes and are subject to all other guidelines and eligibility requirements associated with the fund sources.

In March 2024, MTC approved program award amounts for the top 15 jurisdictions, which included an award of $1,304,000 to the City of Daly City. In order to be eligible for HIP funding per MTC requirements, the City must adopt a Resolution of Local Compliance with State Housing Law. Daly City demonstrated compliance with State Housing Laws by adopting Resolution 25-12 and agreeing to comply with State Housing Element Law, Surplus Land Act, State Density Bonus Law and local Accessory Dwelling Unit streamlining ordinances.

Discussion
City staff identified the John Daly Boulevard Pedestrian and Bicycle Facility Improvements project to be eligible for the grant funding. Staff proposes to submit an application to construct improvements along the existing multi-use path on John Daly Boulevard. The existing multi-use path along the south side of John Daly Boulevard between Ashland Drive and Poncetta Drive was constructed before design standards for pedestrian and bicycle facilities were established. The

Page 132 of 147 ends

Authorization to Apply to the Housing Incentive Pool Grant Program for the John Daly Boulevard Pedestrian and Bicycle Facility Improvements Project Meeting Date: June 9, 2025

Page 2 of 2 ends

proposed project would improve sections of the multi-use path along John Daly Boulevard to allow for safer two-way travel for both pedestrians and bicyclists as well as updating sections of the path to be compliant with current ADA standards. In addition, amenities such as pedestrian-scale lighting, benches and new signage may also be considered.

The project was reviewed by the City’s Bicycle/Pedestrian Advisory Committee (B/PAC) at their January 15, 2025 meeting; the B/PAC was in support of the proposed project.

Fiscal Impact
The total cost to prepare design plans and construct the project is estimated at $1,472,948. The City has been allocated $1,304,000 through the HIP. The program requires that applicants ensure eligibility for CMAQ funds by providing matching funds equal to 11.47% of the total project cost.

This action will accept and appropriate $1,304,000 in HIP grant funds and will appropriate $168,948 of unallocated Measure A funds for the project’s required local match.

Summary/Conclusion
Staff recommends that the City Council:

1. Authorize the City Manager to submit an application to the Metropolitan Transportation Commission’s Housing Incentive Pool grant program for the John Daly Boulevard Pedestrian and Bicycle Facility Improvements Project;

2. Authorize the City Manager, or his designee, to accept and appropriate up to $1,304,000 in Housing Incentive Pool grant funds and execute any necessary funding agreements; and

3. Appropriate $168,948 of unallocated Measure A funds for the local match.

Staff is available to provide any additional information desired by the Mayor or Councilmembers.

Respectfully submitted,
Shirley Chan Richard Chiu, Jr.

Acting City Engineer Director of Public Works
Attachment: Resolution of Local Support – Authorizing the filing of an application for the funding assigned to MTC and committing any necessary matching funds and stating assurance to complete the project

Page 133 of 147 ends

7/11/23
Resolution of Local Support
Resolution No. _____
Authorizing the filing of an application for funding assigned to MTC and committing any necessary matching funds and stating assurance to complete the project WHEREAS, CITY OF DALY CITY (herein referred to as APPLICANT) is submitting an application to the Metropolitan Transportation Commission (MTC) for $1,304,000 in funding assigned to MTC for programming discretion, which includes federal funding administered by the Federal Highway Administration (FHWA) and federal or state funding administered by the California Transportation Commission (CTC) such as Surface Transportation Block Grant Program (STP) funding, Congestion Mitigation and Air Quality Improvement Program (CMAQ) funding, Carbon Reduction Program (CRP) funding, Transportation Alternatives (TA) set-aside/Active Transportation Program (ATP) funding, and Regional Transportation Improvement Program (RTIP) funding (herein collectively referred to as REGIONAL DISCRETIONARY FUNDING) for the John Daly Boulevard Pedestrian and Bicycle Facility Improvements (herein referred to as PROJECT) for the Housing Incentive Pool grant program (herein referred to as PROGRAM); and WHEREAS, the United States Congress from time to time enacts and amends legislation to provide funding for various transportation needs and programs, (collectively, the FEDERAL TRANSPORTATION ACT) including, but not limited to the Surface Transportation Block Grant Program (STP) (23 U.S.C. § 133), the Congestion Mitigation and Air Quality Improvement Program (CMAQ) (23 U.S.C. § 149), the Carbon Reduction Program (CRP) (23 U.S.C. § 175), and the Transportation Alternatives (TA) set-aside (23 U.S.C. § 133); and WHEREAS, state statutes, including California Streets and Highways Code §182.6, §182.7, and §2381(a)(1), and California Government Code §14527, provide various funding programs for the programming discretion of the Metropolitan Planning Organization (MPO) and the Regional Transportation Planning Agency (RTPA); and
WHEREAS, pursuant to the FEDERAL TRANSPORTATION ACT, and any regulations promulgated thereunder, eligible project sponsors wishing to receive federal or state funds for a regionally-significant project shall submit an application first with the appropriate MPO, or RTPA, as applicable, for review and inclusion in the federal Transportation Improvement Program (TIP); and
WHEREAS, MTC is the MPO and RTPA for the nine counties of the San Francisco Bay region; and
WHEREAS, MTC has adopted a Regional Project Funding Delivery Policy (MTC Resolution No. 3606, revised) that sets out procedures governing the application and use of REGIONAL DISCRETIONARY FUNDING; and
WHEREAS, APPLICANT is an eligible sponsor for REGIONAL DISCRETIONARY FUNDING; and
WHEREAS, as part of the application for REGIONAL DISCRETIONARY FUNDING, MTC requires a resolution adopted by the responsible implementing agency stating the following:
•the commitment of any required matching funds; and
•that the sponsor understands that the REGIONAL DISCRETIONARY FUNDING is fixed at the programmed amount, and therefore any cost increase cannot be expected to be funded with additional REGIONAL DISCRETIONARY FUNDING; and •that the PROJECT will comply with the procedures, delivery milestones and funding

Page 134 of 147 ends

7/11/23
deadlines specified in the Regional Project Funding Delivery Policy (MTC Resolution No. 3606, revised); and
•the assurance of the sponsor to complete the PROJECT as described in the application, subject to environmental clearance, and if approved, as included in MTC's federal Transportation Improvement Program (TIP); and •that the PROJECT will have adequate staffing resources to deliver and complete the PROJECT within the schedule submitted with the project application; and •that the PROJECT will comply with all project-specific requirements as set forth in the PROGRAM; and
•that APPLICANT has assigned, and will maintain a single point of contact for all FHWA- and CTC-funded transportation projects to coordinate within the agency and with the respective County Transportation Agency (CTA), MTC, Caltrans, FHWA, and CTC on all communications, inquires or issues that may arise during the federal programming and delivery process for all FHWA- and CTC-funded transportation and transit projects implemented by APPLICANT; and
WHEREAS, that APPLICANT is authorized to submit an application for REGIONAL DISCRETIONARY FUNDING for the PROJECT; and
WHEREAS, there is no legal impediment to APPLICANT making applications for the funds; and
WHEREAS, there is no pending or threatened litigation that might in any way adversely affect the proposed PROJECT, or the ability of APPLICANT to deliver such PROJECT; and WHEREAS, APPLICANT authorizes its Executive Director, General Manager, or designee to execute and file an application with MTC for REGIONAL DISCRETIONARY FUNDING for the PROJECT as referenced in this resolution; and
WHEREAS, MTC requires that a copy of this resolution be transmitted to the MTC in conjunction with the filing of the application.

NOW, THEREFORE, BE IT RESOLVED that the APPLICANT is authorized to execute and file an application for funding for the PROJECT for REGIONAL DISCRETIONARY FUNDING under the FEDERAL TRANSPORTATION ACT or continued funding; and be it further RESOLVED that APPLICANT will provide any required matching funds; and be it further RESOLVED that APPLICANT understands that the REGIONAL DISCRETIONARY FUNDING for the project is fixed at the MTC approved programmed amount, and that any cost increases must be funded by the APPLICANT from other funds, and that APPLICANT does not expect any cost increases to be funded with additional REGIONAL DISCRETIONARY FUNDING; and be it further
RESOLVED that APPLICANT understands the funding deadlines associated with these funds and will comply with the provisions and requirements of the Regional Project Funding Delivery Policy (MTC Resolution No. 3606, revised) and APPLICANT has, and will retain the expertise, knowledge and resources necessary to deliver federally-funded transportation and transit projects, and has assigned, and will maintain a single point of contact for all FHWA- and CTC-funded transportation projects to coordinate within the agency and with the respective County Transportation Agency (CTA), MTC, Caltrans, FHWA, and CTC on all communications, inquires or issues that may arise during the federal programming and delivery process for all FHWA- and CTC-funded transportation and transit projects implemented by APPLICANT; and be it further
RESOLVED that PROJECT will be implemented as described in the complete application

Page 135 of 147 ends

7/11/23
and in this resolution, subject to environmental clearance, and, if approved, for the amount approved by MTC and programmed in the federal TIP; and be it further RESOLVED that APPLICANT has reviewed the PROJECT and has adequate staffing resources to deliver and complete the PROJECT within the schedule submitted with the project application; and be it further
RESOLVED that PROJECT will comply with the requirements as set forth in MTC programming guidelines and project selection procedures for the PROGRAM; and be it further RESOLVED that, in the case of a transit project, APPLICANT agrees to comply with the requirements of MTC’s Transit Coordination Implementation Plan as set forth in MTC Resolution No. 3866, revised; and be it further
RESOLVED that, in the case of a highway project, APPLICANT agrees to comply with the requirements of MTC’s Traffic Operations System (TOS) Policy as set forth in MTC Resolution No. 4104; and be it further
RESOLVED that, in the case of an RTIP project, PROJECT is included in a local congestion management plan, or is consistent with the capital improvement program adopted pursuant to MTC’s funding agreement with the County Transportation Agency (CTA); and be it further RESOLVED that APPLICANT is an eligible sponsor of REGIONAL DISCRETIONARY FUNDING funded projects; and be it further
RESOLVED that APPLICANT is authorized to submit an application for REGIONAL DISCRETIONARY FUNDING for the PROJECT; and be it further RESOLVED that there is no legal impediment to APPLICANT making applications for the funds; and be it further
RESOLVED that there is no pending or threatened litigation that might in any way adversely affect the proposed PROJECT, or the ability of APPLICANT to deliver such PROJECT; and be it further
RESOLVED that APPLICANT authorizes its Executive Director, General Manager, City Manager, or designee to execute and file an application with MTC for REGIONAL DISCRETIONARY FUNDING for the PROJECT as referenced in this resolution; and be it further RESOLVED that a copy of this resolution will be transmitted to the MTC in conjunction with the filing of the application; and be it further
RESOLVED that the MTC is requested to support the application for the PROJECT described in the resolution, and if approved, to include the PROJECT in MTC's federal TIP upon submittal by the project sponsor for TIP programming.

Page 136 of 147 ends

City Council Meeting Agenda Report Item # _____

Meeting Date: June 9, 2025

Subject: Public Hearing - Notice of Lien and Special Assessment to Rental Property Recommended Action
It is recommended that the Ci ty Council approve the Notice of Lien and Special Assessment to Rental Property for properties included in the Attachment with the County of San Mateo for all unpaid Business License Rental Property taxes and penalties.

Background
On June 25, 2012 the City Council entered into an agreement with the County of San Mateo to impose lien assessments on real property for unpaid Business Licenses for rental properties . This agreement was approved by R esolution No: 12-99. Daly City Municipal Code, Chapters 5.16.050 and 5.04.030 requires that all commercial and residential rental property pay a license tax based on the gross rental income collected.

Discussion
Notices were sent on May 14, 2025 to the rental property owners in an effort to bring them into compliance. The past due t axes were due on October 1, 2024 based on the actual gross rental income reported on their 2023 Federal income tax return.

Proper notice of the Public Hearing was published by the City Clerk. Notices of Intent to Lien Rental Property were mailed to past due and unresponsive property owners included in the Attachment.

This Notice provided the property owners the opportunity to clear the possible lien and validate the information provided by the County of San Mateo. All unpaid taxes will be assessed on the upcoming Fiscal Year 2025/2026 property tax bill if they have not been paid to the City of Daly City by July 9, 2025.

Fiscal Impact
In the current Fiscal Year 2025, p rojected revenue collection of unpaid Business License Rental Property tax from the County of San Mateo is approximately $218,248.

Summary/Conclusion
Staff recommends the City Council conduct a public hearing and approve the Notice of Lien and Special Assessment to Real Property for properties listed in the Attachment.

Staff is available to provide any additional information desired by the Mayor or Councilmembers.

Respectfully submitted,

Tim Nevin
Director of Finance and Administrative Services

Attachment: Notice of Lien and Special Assessment to Rental Property

Page 137 of 147 ends

Rental Property Address License No. Tax Year Company Name 122 PENHURST CT BL-518429 2023 122 Penhurst
18 SOUTHDALE AVE BL-517861 2023 18Southdale
6229 MISSION ST BL-033644 2023 6229-6231 MISSION PROPERTY LLC 6231A/6233 MISSION ST BL-033644 2023 6229-6231 MISSION PROPERTY LLC 705 SERRAMONTE BLVD BL-034664 2023 705 SERRAMONTE APARTMENTS 500 TEMPLETON AVE BL-301379 2023 A L MILANO FAMILY TRUST S. M. ALLEN (TRUSTEE) 67 CAMELOT CT BL-002965-1 2023 ABC LIM INVESTMENTS LLC
28 HEATH CT BL-002965-1 2023 ABC LIM INVESTMENTS LLC
996 GELLERT BLVD BL-002965-1 2023 ABC LIM INVESTMENTS LLC 114 WILSHIRE AVE BL-518181 2023 ALFRED MAK AND ADA ZHU REVOCABLE TRUST 6654 MISSION ST BL-302640 2023 ALVITES, WILBER W.-302640 698 CLARINADA AVE BL-302629 2023 APELIN, FLORENTINO & HYDIE LM-302629 79 RIDGEFIELD AVE BL-024247 2023 ARAGON, EMMANUEL
14 WESTDALE AVE BL-034870 2023 ASENLOO, ELINOEMI
105 ALTA VISTA WAY BL-518564 2023 ASHLEY NG OUYE
270 GREENVIEW DR BL-033171 2023 AVILES, CECILIA
619 VILLA ST BL-300013 2023 BACON, MARY-300013
625 VILLA ST BL-300013 2023 BACON, MARY-300013
75 OAKRIDGE DR BL-017084 2023 BAUS, WILLIAM & JOAN
145 DEL PRADO DR BL-302092 2023 BAUTISTA, TEODORO H & ROSALINDA-302092 4137 CALLAN BLVD BL-011752 2023 BELENSON, ARSENIO & ELMA 33 RIDGEFIELD AVE BL-302584 2023 BENIGNO, CHARLIE & ESTER-302584 76 GARIBALDI ST BL-011753 2023 BITUIN, BELINDA
477 JOHN DALY BLVD BL-302479 2023 BRACKS, ADRIENNE-302479 828 N MAYFAIR AVE BL-017541 2023 BRADISH, CATHY
371 IMPERIAL WAY BL-032862 2023 BUSLOVICH, DMITRIY & ELENA 1551 SOUTHGATE AVE #239 BL-033102 2023 CABREROS, LUCIA C. 590 LISBON ST BL-001809 2023 CADY, CONRAD
627 TEMPLETON AVE BL-302849 2023 CAMPOS, EDGARDO
67 BELLEVUE AVE BL-302863 2023 CANDILA, LYDIA-302863
38 ARDENDALE DR BL-518529 2023 Cassie and James McGraw
360 INNISFREE DR BL-032860 2023 CAVA, DAVID
365 LAKESHIRE DR BL-032313 2023 CELEMIN, ANGELITA D.
69 SKYLINE DR BL-034176 2023 CERVANTES, VICTOR J.
23 FAIRMONT DR BL-301440 2023 CHAN, DAVIN
71 MAYWOOD AVE BL-033571 2023 CHAN, KIN SAN
266 WESTRIDGE AVE BL-031897 2023 CHAN, PETER
14 GRANDVIEW AVE BL-301883 2023 CHAO, ESMERALDA-301883
30 VISTA GRANDE AVE BL-021579 2023 CHEN, RAYMOND
323 DEANNE LN BL-301953-2 2023 CHIN, MEI K. & TING Y.
396 IMPERIAL WAY 208 BL-033379 2023 CHOE, JAE
62 FAIRLAWN AVE BL-302682 2023 CHOW, MICHELLE Y.L.-302682 4215 CALLAN BLVD BL-302682 2023 CHOW, MICHELLE Y.L.-302682 Notice of Lien and Special Assessment to Rental Property

Page 138 of 147 ends

192 E VISTA AVE BL-301939 2023 CHUCK, HELEN-301939
180 WESTMOOR AVE BL-301899 2023 CLIFFORD, HELEN-301899
56 3RD AVE BL-301368 2023 CRISOLOGO, NATIVIDAD T.-301368 77 WESTFIELD AVE BL-034626 2023 DALAL, MANISH & DALAL, MANSI 89 FAIRLAWN AVE BL-302228 2023 DANIEL J. MORIARTY & ELAINE M. TRS-302228 57 LAKE VISTA AVE BL-302228 2023 DANIEL J. MORIARTY & ELAINE M. TRS-302228 87 BELLEVUE AVE BL-518589 2023 Daniel Lyons, Karen Lyons, Barbara Lyons 136 BRUNO AVE BL-301424 2023 DAVENPORT, ROBERT
34 LAKEWOOD DR BL-017594 2023 DAVIS, BERNA
357 SAN DIEGO AVE BL-302658 2023 DE ROSAS, NEMESIO-302658 659 LISBON ST BL-302949 2023 DEERING, ERNESTINA-302949
454 FLORENCE ST BL-011414 2023 DEL ROSARIO, EMMA
4264 CALLAN BLVD BL-017596 2023 DELA CRUZ, LEANDRO
11 MAYFIELD AVE BL-011783 2023 DELA CRUZ, MARIANO & LIGAYA 1549 ANNIE ST BL-017498 2023 DELUCCHI, BARBARA
7123 A MISSION ST BL-300760 2023 DERMEG, RICHARD-300760 355 EL DORADO DR BL-034463 2023 DONAHOE, TRACY & DONAHOE, ERIN 25 ALEXANDER AVE BL-019430 2023 EID, SYLVIA & EID, FRANKIE 227 PALISADES DR BL-033031 2023 EJTEHADIAN, SONIA & MANSOURI, AMIR 4023 CALLAN BLVD BL-011787 2023 ELISHEN, GLORIA
11 WESTFIELD AVE BL-301795 2023 ESTUPINIAN, JOY-301795
127 WERNER AVE BL-034092 2023 ETERNITY GROUP LLC
368 IMPERIAL WAY #345 BL-032869 2023 EUGENIO, MAYNARDO A. & LILLIAN T. 1064 87TH ST BL-301313 2023 EVERWEALTH MANAGEMENT INC. TR-301313 187 OAKRIDGE DR BL-030003 2023 FENG, BINGNAN
247 VISTA GRANDE AVE BL-017610 2023 FLANNERY, STEPHEN
790 HANOVER ST BL-011267 2023 FONG, JASON
886 N MAYFAIR AVE BL-016465 2023 FONG, LOUISE
2455 GENEVA AVE BL-517818 2023 GARRETT & LAURA ALCALA
352 WINCHESTER ST BL-518463 2023 GERARD CALIXTON
452 LAKESHIRE DR BL-029164 2023 GHATTAS, MAURICE
2350 JUNIPERO SERRA BLVD BL-301062 2023 GLIMIDAKIS, VASILIOS 550 WASHINGTON ST BL-301062 2023 GLIMIDAKIS, VASILIOS
144 VISTA AVE BL-301062 2023 GLIMIDAKIS, VASILIOS
2368 JUNIPERO SERRA BLVD BL-301062 2023 GLIMIDAKIS, VASILIOS 101 WELLINGTON AVE BL-302698 2023 GOBAR PEGGY PARSONS TR ETAL & HEMAR CORP 668 ABBOT AVE BL-302223 2023 GOMEZ, FELIX & ELOISA-302223 6815 MISSION ST BL-017643 2023 GONZALES, CHARLES
357 BARBARA LN BL-015910 2023 GONZALES, IMMIE
373 PEORIA ST BL-301070 2023 GONZALEZ, HECTOR A. & RENY V.-301070 875 S MAYFAIR AVE BL-301453 2023 GRIFFIN, MICHAEL-301453 1080 MAYFAIR AVE BL-017645 2023 GUAN, DAVID NGA
27 SANTA ELENA AVE BL-032341 2023 HALADY, PRATISH
62 SEACLIFF AVE BL-032341 2023 HALADY, PRATISH
Notice of Lien and Special Assessment to Rental Property

Page 139 of 147 ends

663 HIGATE DR BL-033455 2023 HAPIN, HELAINE
4037 CALLAN BLVD BL-302906 2023 HARB, LAILA-302906
121 W MOLTKE ST BL-033784 2023 HAU, JANNIFER
611 S MAYFAIR AVE BL-302553 2023 HAYASHI, WILLIAM L. & MOONJA-302553 372 ARDENDALE DR BL-017657 2023 HAYNES, STEVEN ALLEN
445 WESTLAKE AVE BL-031507 2023 HE, YUJUN
85-87 WELLINGTON AVE BL-034628 2023 HERNANDEZ, LUIS MANUEL 409 ST FRANCIS BLVD BL-030831 2023 JABER, NAJWA H.
234 CANYON DR BL-013126 2023 JACKSON, CLARENCE E JR
24 ZITA MNR BL-301426 2023 JAUREGUI, ANGELINA
789 HILLSIDE BLVD BL-017670 2023 JAVIER GEORGE
212 THIERS ST BL-017669 2023 JAVIER-CACERES, PENELOPE
141 1ST AVE BL-302313 2023 JIMENEZ, JOSE E. & ROSA MARIA P.-302313 90 TALLWOOD DR BL-518136 2023 Jose D Martinez
15 WESTMONT DR BL-302314 2023 JUAN, MAGDALENA & MANUEL-302314 6155 MISSION ST BL-300130 2023 KIMPO, DICK & NATIVIDAD-300130 6135 MISSION ST BL-300130 2023 KIMPO, DICK & NATIVIDAD-300130 674 ABBOT AVE BL-011818 2023 KOFF, CHRISTOPHER D
269 CANTERBURY AVE BL-017675 2023 KUBOVCIK, GERALD & ANDREA 85 JOHN GLENN CIR BL-029989 2023 KUPERMAN, MICHAEL
88 AVALON DR BL-033258 2023 LEE, ANTHONY (AVALON ST.)
43 MARGATE ST BL-031058 2023 LEE, ANTHONY (MARGATE AVE) 1125 HANOVER ST BL-017683 2023 LEE, BENJAMIN
580 LISBON ST BL-301107 2023 LEE, HOLDEN CHEW G. & DONNA S.-301107 138 PAMELA CT BL-033380 2023 LEE, JULIE K.
191 DEL PRADO DR BL-034868 2023 LEE, TA CHING
70 WESTPARK DR BL-006426 2023 LEE, WESLEY
763 GELLERT BLVD BL-006426 2023 LEE, WESLEY
121 MARIPOSA AVE BL-518028 2023 LENA LI YUN MA
36 EASTGATE DR BL-032318 2023 LENDWAY, PETER
94 LYCETT CIR BL-032708 2023 LI, DAISY
811 ST FRANCIS BLVD BL-032708 2023 LI, DAISY
539 SAN DIEGO AVE BL-032693 2023 LIANG, HONG LE & YANG, YONG NA 24 FAIRMONT DR BL-031543 2023 LIANG, WU ZU
48 AVALON DR BL-032689 2023 LIN, MAY
39 E CAVOUR ST BL-033027 2023 LIU, ANG JIAN
66 BEPLER ST BL-033029 2023 LIU, YUEYING
582 ABBOT AVE BL-032454 2023 LIU, ZICHAO
6711 MISSION ST BL-030810 2023 LOPEZ, EDGAR O. CRUZ & CALDERON, NATALIA G. 241 ALTA VISTA WAY BL-017729 2023 LOPEZ, IVAN/XAVIER/DIANA 287 POLARIS WAY BL-030956 2023 LOUIE, JOANNE
381 PEORIA ST BL-028821 2023 LU, DI FEI & KUANG, MEI QI 6848 MISSION ST BL-032842 2023 LU, YAOXIANG
97 LONGVIEW DR BL-029941 2023 LU, YU ZHEN
Notice of Lien and Special Assessment to Rental Property

Page 140 of 147 ends

28 FRANKFORT ST BL-302194 2023 MACABABBAD, GLORINA R.-302194 48 NORTHGATE BL-032013 2023 MAGRI, AMANDA & JUSTIN
135 SCHOOL ST BL-301047 2023 MATEO APARTMENTS
141 SCHOOL ST BL-301047 2023 MATEO APARTMENTS
1257 BRUNSWICK ST BL-301227 2023 MAURICIO, EMETERIO P.-301227 138 STATION AVE BL-002451 2023 MCHUGH, SIOBHAN UNIACKE
335 88TH ST BL-002451 2023 MCHUGH, SIOBHAN UNIACKE
327 CROCKER AVE BL-002451 2023 MCHUGH, SIOBHAN UNIACKE
303 CROCKER AVE BL-002451 2023 MCHUGH, SIOBHAN UNIACKE
323 CROCKER AVE BL-002451 2023 MCHUGH, SIOBHAN UNIACKE
301 CROCKER AVE BL-002451 2023 MCHUGH, SIOBHAN UNIACKE
61 CROCKER AVE BL-302762 2023 MEDINA, ALMA M.-302762
31 ROCKRIDGE AVE BL-029016 2023 MEDINA, JOSHUA & JONAH
201 MORTON DR BL-034289 2023 MENDAROS, LESTER JESS
4211 CALLAN BLVD BL-017745 2023 MERRITT, ROSALIND
85 LAUSANNE AVE BL-302685 2023 MESA, NICOLAS A. JR & EVANGELINE L.-302685 198 TEMPLETON AVE BL-300608 2023 MICHAELIS, JERRY R.-300608 100 BYRNE ST BL-518176 2023 MILESTONE INVESTMENTS
667 VILLA ST BL-302858 2023 MILLER, SAMUEL-302858
673 LISBON ST BL-011849 2023 MIRANDA, RONALDO & ALODIA
172 ABBOT AVE BL-019474 2023 MOORE, JOHN
1491 SOUTHGATE AVE BL-018160 2023 MULLER, STEVE
551 SAN DIEGO AVE BL-017759 2023 NATIVIDAD, CLARITA S
277 POLARIS WAY BL-017760 2023 NAVARRO, CARL T
414 91ST ST BL-031010 2023 NAY, LIN
57 ALEXANDER AVE BL-031010 2023 NAY, LIN
308 CERRO DR BL-017779 2023 NG, CHING YUN
197 DENNIS DR BL-030763 2023 NG, TAK SANG
29 FLEETWOOD DR BL-017781 2023 NOLAN, DENIS P
59 EASTGATE DR BL-301601 2023 NOVALES, PAUL-301601
15 EASTGATE DR BL-301601 2023 NOVALES, PAUL-301601
370 IMPERIAL WAY #128 BL-033223 2023 OBENCHAIN, CYNTHIA 37 RAVILLA CT BL-302710 2023 OBICO, TEODULO T. & ESTER V.-302710 588 ALEXIS CIR BL-017791 2023 OMBAO, ERWIN Z
142 MORTON DR BL-017793 2023 ONG ERICK K TRUST ONG TSE TRUST 67 PALMDALE AVE BL-016771 2023 OO, SAN
1087 87TH ST BL-016771 2023 OO, SAN
44 RIDGEFIELD AVE BL-016771 2023 OO, SAN
1002 MAYFAIR AVE BL-016771 2023 OO, SAN
1 BOLERO WAY BL-017796 2023 OROPEZA, JOSE JESUS & MAYRA F 2 SAN JUAN AVE BL-302543 2023 ORTIZ, IBARRA M. & SHEILA D.-302543 290 BAY RIDGE DR BL-017802 2023 PADUA, ANTONIO C
76 SHAKESPEARE ST BL-302268 2023 PALOMO, ANA F. & VICENTE-302268 496 IRVINGTON ST BL-030561 2023 PANALIGAN, ROY
Notice of Lien and Special Assessment to Rental Property

Page 141 of 147 ends

731 NIANTIC AVE BL-017804 2023 PANAMBO, PURE B
89 ROCKFORD AVE BL-032106 2023 PANCHOLY, MITESH
1606 GRAYSTONE LN BL-033348 2023 PAVILLARD, VICTOR M
93 BELLEVUE AVE BL-024213 2023 PENNY, HUBERT & EILEEN
147 SANTA BARBARA AVE BL-017809 2023 PETERS, GARY W ESQ 119 STATION AVE BL-301905 2023 PICKERING, LOUISA-301905 686 SKYLINE DR BL-302409 2023 RAZZOUQ, PETER-302409
1408 EDDINGTON LN BL-033188 2023 RECABARREN, FRANCISCO
121 DEL PRADO DR BL-029984 2023 RONG, JASON
88 GLENROSE BL-029984 2023 RONG, JASON
37 CRESTLINE BL-029984 2023 RONG, JASON
111 SIMPSON BL-029984 2023 RONG, JASON
151 DENNIS BL-029984 2023 RONG, JASON
170 CAMELIA BL-029984 2023 RONG, JASON
796 KING DR BL-029984 2023 RONG, JASON
24 GOETHE ST BL-517754 2023 RYAN SIU
121 ST MICHAELS CT BL-302856 2023 SAGHAFI, REINA-302856 274 ST CATHERINE DR BL-017835 2023 SAMPAGUITA LTD TRUST 32 PENHURST AVE BL-017838 2023 SANTIAGO, MARK D & BEVERLY A 254 FRANKFORT ST BL-302767 2023 SEGURA, MARGA-302767
341 GELLERT BLVD UNIT C BL-301119 2023 SEQUOIA PROPERTIES MANAGEMENT, LLC 341 GELLERT BLVD UNIT B BL-301119 2023 SEQUOIA PROPERTIES MANAGEMENT, LLC 341 GELLERT BLVD UNIT A BL-301119 2023 SEQUOIA PROPERTIES MANAGEMENT, LLC 465 VERDUCCI DR BL-031318 2023 SFO CRASHPAD
400 EL DORADO DR BL-017841 2023 SHELEY, DONALD B
591 SYLVAN ST BL-302639 2023 SINGH, JASWANT & HARBHAJAN-302639 50 LOS OLIVOS AVE BL-302681 2023 SIOSON, FRANCISCO & PRISCILLA, TRS-302681 930 WYANDOTTE AVE BL-030848 2023 STANCO, NICHOLAS F
856 HILLSIDE BLVD BL-302090 2023 SUELZLE, ELSIE-302090
438 SKYLINE DR BL-017858 2023 SUMMERS, BERNIECE
260 3RD AVE BL-017859 2023 SUMMERS, TIMOTHY B
73 MUIRWOOD DR BL-035467 2023 SUZANNE LO & CHARLES HUANG 4031 CALLAN BLVD BL-011867 2023 TAHA, QASED H
7300 MISSION BL-517842 2023 TALAB QARAJAH
191 MARIPOSA AVE BL-031938 2023 TAM, JASON SZE-MING
70 MISSION CIR BL-030035 2023 TAN, MIAO XIA
26 CLIFFSIDE DR BL-016353 2023 TANG, TRUC
10 NORTHGATE CT BL-029948 2023 TANUDJAJA, CRISNOYO
1551 SOUTHGATE AVE #120 BL-033308 2023 TENG, PAUL SHIAO PENG 1322 SOUTHGATE AVE BL-029170 2023 THE CONSTANCE F. JOHNSTON REV. TRUST 267 WYANDOTTE AVE BL-302336 2023 THE HERBERT MILLER EXEMPTION TRUST 56 LOS OLIVOS AVE BL-302336 2023 THE HERBERT MILLER EXEMPTION TRUST 402 RIO VERDE ST BL-302336 2023 THE HERBERT MILLER EXEMPTION TRUST 587 SYLVAN ST BL-302336 2023 THE HERBERT MILLER EXEMPTION TRUST Notice of Lien and Special Assessment to Rental Property

Page 142 of 147 ends

232 SHIPLEY AVE BL-301143 2023 THE TANDOC FAMILY TRUST
654 SYLVAN ST BL-301143 2023 THE TANDOC FAMILY TRUST
70 PENHURST AVE BL-017869 2023 TOJI, LARRY K JR
271 GLENWOOD AVE BL-302692 2023 TOM, ELIZABETH
474 90TH ST BL-300988 2023 TORINO APARTMENTS
1551 SOUTHGATE AVE #320 BL-033309 2023 TORRES, JEANETTE M. 531 WYANDOTTE AVE BL-032253 2023 TORRES, MARIA GUADALUPE 1018 S MAYFAIR AVE BL-032253 2023 TORRES, MARIA GUADALUPE 99 PARKVIEW AVE BL-517675 2023 TRAM N LA
1184-1186 HILLSIDE BL-017871 2023 TRINIDAD, LARRY S
812 SKYLINE DR BL-302163 2023 TRONOFF, THEODORE V.-302163 480 WESTMOOR AVE BL-034309 2023 TU, STEPHEN
4416 CALLAN BLVD BL-022331 2023 TUPUA, MISITANA
256 STATION AVE BL-030705 2023 TUVO, JOHN & TUVO, CARL
53 EASTLAKE AVE BL-012294 2023 UNIACKE, BRENDAN JOSEPH
150 STATION AVE BL-012294 2023 UNIACKE, BRENDAN JOSEPH
36 EASTLAKE AVE BL-012294 2023 UNIACKE, BRENDAN JOSEPH
50 CANTERBURY AVE BL-017874 2023 VALDEZ, IRINEO R JR & JUSTINA P 821 BRUNSWICK ST BL-301428 2023 VERDIN, JEANETTE R.-301428 56 MONTCLAIR AVE BL-032517 2023 WAN MEI NG
90 ZITA MNR BL-032517 2023 WAN MEI NG
35 ESCUELA DR BL-302756 2023 WC DALY CITY LLC
420 GUTTENBERG ST BL-017880 2023 WILHELM, ASTERIA P
1017 SKYLINE DR BL-011883 2023 WONG, HOI TONG
91 MONTEBELLO DR BL-029229 2023 WONG, KA HO
89 ARDEN CT BL-013106 2023 WONG, NICKI
709 GELLERT BLVD BL-012837 2023 WOO, PETER
723 GREEN RIDGE DR #3 BL-032920 2023 WOO, PUI WO
24 GLENBROOK AVE BL-030880 2023 WU, KEVIN & WU, JOHN
10 BELHAVEN AVE BL-012608 2023 XIE, CELINE
607 SYLVAN ST BL-029208 2023 XINDI INC
170 SCHOOL ST BL-029208 2023 XINDI INC
270 WELLINGTON AVE BL-302464 2023 YEE, CALVIN-302464
64 SOUTHDALE AVE BL-302630 2023 YEONG, JENSON & JANET-302630 95 HAMPSHIRE AVE BL-029243 2023 YEUNG, SAU MING
147 MORNINGSIDE DR BL-032495 2023 YIN, RONGMAN
370 IMPERIAL WAY #223 BL-032993 2023 YU, VICTOR SIK KWAN 113 FAIRWAY DR BL-302451 2023 YUEN, DAVID & YIP, BARBARA-302451 200 PALISADES DR BL-029242 2023 YUEN, JASON
361 PEORIA ST BL-300634 2023 YUN, PATRICK T. & SAY MOY-300634 281 ALTA LOMA AVE BL-034505 2023 ZABALZA, KATHLEEN
24 ALEXANDER AVE BL-032506 2023 ZHEN, HAOSONG
145 WARWICK ST BL-033404 2023 ZHU, TRENT
Notice of Lien and Special Assessment to Rental Property

Page 143 of 147 ends
Page 144 of 147 ends

1 ORDINANCE NO.

AN ORDINANCE OF THE CITY OF DALY CITY ADDING
CHAPTER 15.32.280 OF TITLE 15 OF THE DALY CITY MUNICIPAL CODE RE: FIRE HAZARD SEVERITY ZONES
The City Council of the City of Daly City, DOES ORDAIN as follows:

SECTION 1: DESIGNATION OF FIRE HAZARD SEVERITY ZONES
A. The City of Daly City is a “local agency” as defined in Government Code section 51177(e).

B. In accordance with Government Code section 51179(a), the City of Daly City hereby designates the Fire Hazard Severity Zones in its jurisdiction as recommended by the State Fire Marshal pursuant to Government Code section 51178 and received by the City of Daly on February 25, 2025.

C. In accordance with Government Code section 51178.5, within 30 days after receiving the Fire Hazard Severity Zones as recommended by the State Fire Mashal, the City of Daly City made the information available for public review and comment and presented the information in a format that is understandable to the general public, including but not limited, maps.

D. The Official Map of Fire Hazard Severity Zones designated by the City of Daly City is hereby attached as Exhibit “A”, incorporated by reference, and entitled “The Official Map of the City of Daly City Fire Hazard Severity Zones, Dated February 25, 2025“.

E. The Official Map of the City of Daly City Fire Hazard Severity Zones, Dated February 25, 2025, is also located electronically on the City of Daly City’s official website.

F. The City Council of the City of Daly City finds that The Official Map of the City of Daly City Fire Hazard Severity Zones, Dated February 25, 2025, confirms that all areas within the City of Daly City have been designated “Moderate.”
SECTION 2. CALIFORNIA ENVIRONMENTAL QUALITYACT DETERMINATION.

The City Council of Daly City finds that this ordinance is statutory exempt from the California Environmental Quality Act (CEQA) in that it is not a project as provided by the Act, in that it does not have a potential for resulting in a detrimental physical change in the environment, directly or ultimately, as provided in Title 14, Section 15378(a), and that it is also exempt under Public Resources Code section 21080(b)(1) and CEQA Guidelines Section 15002(i) as a ministerial action required by Government Code section 51179(a).

SECTION 3. SEVERABILITY.

If any section, subsection, provision or part of this Ordinance, or its application to any person or circumstance, is held to be unconstitutional or otherwise invalid, the remainder of this Ordinance, and the application of such provision to other person or circumstances, shall not be affected thereby and shall remain in full force and effect and, to that end, the provisions of this Ordinance are severable.

Page 145 of 147 ends

2 SECTION 4. PUBLICATION AND EFFECTIVE DATE.

This Ordinance shall be published according to law. This ordinance shall become effective thirty (30) days from and after its adoption.

Introduced this day of , 2025.

Passed and adopted as an Ordinance of the City of Daly City at a regular meeting of the City Council of the City of Daly City held on the day of , 2025, by the following vote:

AYES, Councilmembers:

NOES, Councilmembers:

ABSENT, Councilmembers:

CITY CLERK OF THE CITY OF DALY CITY
APPROVED:

MAYOR OF THE CITY OF DALY CITY

Page 146 of 147 ends

City and County boundaries as of 10/22/24 (CA Board of Equalization) CAL FIRE State Responsibility Areas (SRA25_1)
CAL FIRE Fire Hazard Severity Zones (FHSZSRA23_3, FHSZLRA_25_1) Data Sources:

Daniel Berlant, State Fire Marshal, CA Department of Forestry and Fire Protection Joe Tyler, Director/Fire Chief, CA Department of Forestry and Fire Protection Wade Crowfoot, Secretary for Natural Resources, CA Natural Resources Agency Gavin Newsom, Governor, State of CaliforniaThe State of California and the Department of Forestry and Fire Pro
tection make no representations or warranties regarding the accuracy of data or maps. Neither the State nor the Department shall be liable under any circumstances for any direct, special, incidental, or consequential damages with respect to any claim by any user or third party on account of, or arising from, the use of data or maps. and other relevant factors including areas where winds
hav
e been identified by the Office of the State Fire Marshal as a major cause of wildfire spread.
statewide criteria and based on the severity of fire hazard that is expect
ed to prevail in those areas. Moderate, high, and very high fire hazard severity zones shall be based on fuel loading, slope, fire weather, Government Code section 51178 requires the State Fire
Marshal t
o identify areas in the state as moderate, high,
and very high fire hazard severity zones based on consistent Waterbody
Federal Responsibility
Area (FRA)Unzoned LRA
Incorporated City
Projection: NAD 83 California Teale Albers
Scale: 1:36,000 at 11" x 1
7"
0 1 2Km
0 1Mi
Moderate
Moderate
Fire Hazard Severity Zones (FHSZ) in Local Responsibility Area (LRA), as Identified by the S
tate Fire Marshal
Daly City
280
Skyline
Blvd
35 1
82 UNINCORPORATED
SAN MATEO CO.

BRISBANE
COLMA

PACIFICA

SAN BRUNO

SAN FRANCISCO SAN FRANCISCO

SOUTH SAN

FRANCISCO
S A N F R A N C I S C O C O .

S
A
N
M
A
T
E
O
C
O
.

February 24, 2025
As Identified by the
St
ate Fire Marshal
Local Responsibility Area
Fire Hazard Sev
erity Zones
CITY OF DALY CITY – SAN MATEO COUNTY
Fire Hazard Severity Zones in State Responsibility
Area (SRA), Eff
ective April 1, 2024
EXHIBIT "A"

Page 147 of 147 ends