ADMINISTRATIVE STAFF REPORT 9.3
TO: Mayor and Town Council September 1, 2026
SUBJECT: Resolution No. 75-2026, awarding a construction contract for the San Ramon Valley Boulevard & Hill Meadow Place Storm Drain
Rehabilitation Project, CIP No. A-330
BACKGROUND
The Town's Capital Improvement Program includes funding under CIP No. A-330, Town-Wide Storm Drain System Management, for the inspection, maintenance, repair, and rehabilitation of the Town' s storm drainage system.
As part of the Town' s ongoing storm drain inspection and condition assessment program, two storm drain segments were identified as priorities for rehabilitation: an approximately 1,100-foot-long, 48-inch corrugated metal pipe ( CMP) located along San Ramon Valley Boulevard and an approximately 1,300-foot-long, 30-inch reinforced concrete pipe (RCP) located along Hill Meadow Place.
The proposed project will rehabilitate the existing storm drainpipes using trenchless rehabilitation methods, along with associated bypass pumping as necessary, void filling, reinstatement of lateral connections, and other related work. Rehabilitation of the existing pipes will extend their useful service life while minimizing excavation and impacts to the surrounding roadways and properties.
DISCUSSION
Six bids were received and opened on August 18, 2026. Kerex Engineering, Inc. submitted the apparent low bid of $1,192,000; however, its bid was deemed non-responsive because the required signature on the proposal form was omitted. The lowest responsive bid was submitted by Insituform Technologies, LLC of Chesterfield, Missouri, in the amount of 1,226,003, which is $34,003, or approximately 2.9%, higher than the nonresponsive bid.
Bid results are summarized in Attachment C. The Engineer’ s estimate was $950, 000.
The low bid is approximately 29% above the Engineer’ s Estimate. The higher pricing is primarily attributed to the limited availability of qualified local contractors, increased material and equipment costs, and higher mobilization costs associated with contractors located outside the Bay Area.
Award of Construction Contract 2 September 1, 2026
San Ramon Valley Blvd. & Hill Meadow Place
Storm Drain Rehabilitation Project CIP No. A-330
Insituform Technologies, LLC is a specialty trenchless pipeline rehabilitation contractor with more than 50 years of experience performing cured-in-place pipe and related pipeline rehabilitation work for municipal stormwater and wastewater systems. Staff has reviewed the contractor’ s qualifications and determined that the firm has the experience and resources necessary to perform the work.
This project is considered a minor alteration to existing facilities and is therefore categorically exempt from the requirements of the California Environmental Quality Act CEQA) according to Guidelines Section 15301 ( Class 1). The work is scheduled to begin in late 2026 and be completed in early 2027.
PUBLIC CONTACT
Posting of the meeting agenda serves as notice to the general public. Before construction begins, residents within close proximity to the project will be notified by the contractor in writing.
FISCAL IMPACT
The low responsive bid amount of $1,226,003, plus a 15% construction contingency of 184,000, yields a total construction budget of $1,410,003. Sufficient funds to cover the construction contract and contingency are contained in Town Wide Storm Drain System Management, CIP No. A-330.
Award of Construction Contract 3 September 1, 2026
San Ramon Valley Blvd. & Hill Meadow Place
Storm Drain Rehabilitation Project CIP No. A-330
RECOMMENDATION
Adopt Resolution No. 75-2026, awarding a construction contract for the San Ramon Valley Boulevard & Hill Meadow Place Storm Drain Rehabilitation Project, CIP No. A330.
Prepared by:
Nader Salama, P.E.
Senior Civil Engineer
Reviewed by:
Diane J. Friedmann
Development Services Director
Attachments: A - Resolution No. 75-2026
B - CIP Pages No. A-330
C - Bid Results Summary
RESOLUTION NO. 75-2026
AWARDING A CONSTRUCTION CONTRACT FOR THE SAN RAMON VALLEY
BOULEVARD & HILL MEADOW PLACE STORM DRAIN REHABILITATION PROJECT, CIP NO. A-330
WHEREAS, the Danville Town Council has previously approved funding in the Capital Improvement Program for Town- Wide Storm Drain System Management, CIP No. A330; and WHEREAS, the project will rehabilitate approximately 1,100 linear feet of 48-inch corrugated metal pipe along San Ramon Valley Boulevard and approximately 1,300 linear feet of 30-inch reinforced concrete pipe along Hill Meadow Place; and WHEREAS, the project is considered a minor alteration of existing public facilities and is categorically exempt from the requirements of the California Environmental Quality Act CEQA) pursuant to Guidelines Section 15301 ( Class 1); and WHEREAS, bids were solicited from contractors for the project; and WHEREAS, six bids were received and publicly opened on August 18, 2026; and WHEREAS, the apparent low bid submitted by Kerex Engineering, Inc. was deemed nonresponsive because the required signature on the proposal form was omitted; and WHEREAS, of the five responsive bids received, the lowest responsive bid was submitted by Insituform Technologies, LLC of Chesterfield, Missouri, in the amount of 1,226,003, and the City Engineer recommends awarding the construction contract to said contractor; now, therefore, be it
RESOLVED, by the Danville Town Council, that the Town award a construction contract for the San Ramon Valley Boulevard & Hill Meadow Place Storm Drain Rehabilitation Project, CIP No. A-330, to Insituform Technologies, LLC of Chesterfield, Missouri; and, be it further
RESOLVED, by the Danville Town Council, that the Town Manager be and hereby is authorized to execute, on behalf of the Town, a written contract with Insituform Technologies, LLC of Chesterfield, Missouri for $1,226,003 and authorize use of a 15% contingency not-to-exceed $184,000 for a total construction budget of $1,410,003 for work in connection therewith, and the City Clerk is hereby directed to attest same and affix thereto the official seal of the Town; and, be it further RESOLVED, that staff is directed to provide notice of the contract award to the California Department of Industrial Relations within 30 days after award, but in no event later than the first day on which the contractor has workers employed on the public work, in accordance with Labor Code section 1773.3.
Docusign Envelope ID: 1B99ADAA- A25F-8137-81B7-E1B35AD8809E
ATTACHMENT A
PAGE 2 OF RESOLUTION NO. 75-2026
APPROVED by the Danville Town Council at a regular meeting on September 1, 2026, by the following vote:
AYES:
NOES:
ABSTAINED:
ABSENT:
MAYOR
APPROVED AS TO FORM: ATTEST:
CITY ATTORNEY CITY CLERK
Docusign Envelope ID: 1B99ADAA- A25F-8137-81B7-E1B35AD8809E danville. ca.gov CIP 39
Town-wide Storm Drain
System Management
CIP Project: A-330
Department/Division: Engineering
Type: Rehabilitate/ Replacement
Status:
Completed Phases:
2023/24
Diablo Road culvert replacement
Vista Grande drainage improvements
Van Patten drainage improvements
East Linda Mesa storm drain replacement
Future Phases:
2026/27
Hill Meadow storm drain repair
San Ramon Valley Boulevard storm pipe repair
Description:
The Town- wide Storm Drain System Management Project includes developing a Storm Drain Master Plan to identify storm drains in need of repair and provide for ongoing capital replacement and maintenance of the Townwide storm drainage system.
Project Cost Estimate:
Prior Years 2026/ 27 2027/ 28 2028/ 29 2029/ 30 2030/ 31 Design/ Plan Review $ 304,742 $ 0 $ 0 $ 0 $ 0 $ 0
Construction $ 4,997,042 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 Inspection & Admin. $ 118,110 $ 0 $ 0 $ 0 $ 0 $ 0
Total Cost Estimate: $ 5,419,894 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000 Total Expenditure: ($ 3,920,135)
Unexpended as of 3/31/ 26: $ 1,499,759
Project Appropriation and Funding:
Prior Years 2026/27 2027/28 2028/29 2029/30 2030/31
CIP Gen Purpose Rev $ 4,668,764 $ 70,000 $ 70,000 $ 70,000 $ 70,000 $ 70,000 Cleanwater Program $ 668,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 Development Fair Share $ 83,130 $ 0 $ 0 $ 0 $ 0 $ 0
Total Funding: $ 5,419,894 $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 75,000
ATTACHMENT B
PROJECT: San Ramon Valley Boulevard & Hill Meadow
Place Storm Drain Rehabilitation Project
BID OPENING: August 18, 2026, at 9:00 a.m. PST
Please direct all questions regarding this bid opening to:
Nader Salama, P.E. (925) 314-3348
nsalama@danville. ca.gov
Engineer’ s Estimate: $950,000
Number of Addendums: 2
OFFICIAL BID RESULTS
CONTRACTOR BID AMOUNT
Insituform Technology LLC $ 1,226,003.00
Jim Freethy Excavating Inc $ 1,418,100.00
Sak Construction $ 1,475,350.00
Hardiman Construction $ 1,692,750.00
Lamassu Utility Services $ 1,727,001.88
Kerex Engineering – unresponsive bid $ 1,192,000.00
Lowest Responsive Bid
I, Kristine Meidberg, City Clerk for the Town of Danville, do hereby affirm that the bids received were not opened prior to the time of the public bid opening.