Cities Index.
Agenda packet

Diamond Bar City Council
June 21, 2022

Document
Agenda packet
Meeting
June 21, 2022
Body
Diamond Bar City Council
Pages
97
Original file
32.2 MB
Text extracted from the city's file for reading and search. Open the original on diamondbarca.iqm2.com. That file is the official record.

Economic
Development Plan
An economic development plan serves as a road map for economic development decision making based on the collection of statistical data, historical perspective, and human potential.

Stormwater
Management Plan
Yes A Stormwater Management addresses flooding associated with stormwater runoff. The Stormwater Management Plan is typically focused on design and construction measures intended to reduce the impact of more frequently occurring minor urban flooding events.

Building Code Yes Community Development-Building codes and associated standards (Residential Code, Mechanical Code, Electrical Code, etc.) govern how new buildings are constructed. They are published by the state and adopted by local jurisdictions, sometimes with amendments to make the codes more locally applicable.

Mitigation actions including buildings be constructed to a higher standard that they may better withstand damage during a hazard event. Such actions may be incorporated into future Building Code updates.

7.1.b
Packet Pg. 348
2022 City of Diamond Bar Local Hazard Mitigation Plan
89 Staff/Personnel
Resources
Available Department/Agency/Position
Site Plan Review
Requirement
Yes A function of the City’s Community Development Department.

Subdivision
Regulation
Yes Community Development-A subdivision ordinance is intended to regulate the development of housing, commercial, industrial, or other uses including associated public infrastructure -- as land is subdivided into buildable lots for sale or future development.

Zoning Yes Community Development-Zoning manages how land use is controlled by local governments. As part of a community’s enforcement efforts, zoning is used to protect the health, welfare, and safety of the public, generally by implementing a Zoning Ordinance. Since zoning regulations enable municipal governments to limit the type and density of development, it may serve as a powerful tool used to protect people and property located in identified hazard areas.

Hillside Management Yes Community Development-The Hillside Management Ordinance is part of the City’s municipal code.

Flood Damage
Prevention Ordnance
Yes Community Development-The City Manager or his/her designate as the Floodplain Manager. The Flood Damage Prevention Ordnance is part of the City’s municipal code.

7.1.b
Packet Pg. 349
2022 City of Diamond Bar Local Hazard Mitigation Plan
90 Administrative and Technical Capability
The ability of a local government to develop and implement mitigation projects, policies, and programs is contingent upon its level of staffing and other available resources.

Administrative capability is determined by evaluating whether there are an adequate number of personnel to complete mitigation activities. Similarly, technical capability can be evaluated by assessing the level of knowledge and technical expertise of local government employees, such as personnel skilled in planning, engineering and building codes. As part of the plan update process, the HMC reviewed and updated any changes that have occurred in the City’s level of administrative and technical capabilities since the last plan update. As applicable, these changes were reviewed by the HMC during the LHMP update process.

Administrative and technical resources available to the city to support the implementation of hazard mitigation management actions are listed in Table 39: Administrative and Technical Capabilities.

7.1.b
Packet Pg. 350
2022 City of Diamond Bar Local Hazard Mitigation Plan
91 Table 34: Administrative and Technical Capabilities
Staff/Personnel
Resources
Available Department/Agency/Position
Planning Commission Yes City Manager Office/Community Development Local Emergency
Planning Committee
(LEPC)
Yes City Manager’s Office/Director of Emergency Services: Maintains and updates the City of Diamond Bar Emergency Response Plan/activities. During a hazard event, the LEPC coordinates local response and relief activities being planned and implemented from the City’s Emergency Operation Center (EOC).

The group also works closely with local, state, and federal partners to support planning and training to provide information during the four phases of emergency management (disaster preparedness, response, recovery, and mitigation); and to coordinate assistance individual and stakeholder segments during and after the disaster.

Mutual Aid Compact Yes City Manager’s Office/Director of Emergency Services Building Inspection/ Community Development Department/Building and Safety Division Building Official Yes Community Development/Building/Building Official: Oversees the effective, efficient, fair, and safe enforcement of the 2019 City of Diamond Bar Building Code. Provides direct or contractual civil, structural, and mechanical engineering services, including contract, project, and construction management.

Floodplain Manager Yes City Manager’s Office: Enforces the Floodplain Management Ordinance; ensures proposed new development does not increase flood risk; and ensures new developments are not located below in geographic areas identified on flood maps as being in the 100-year flood zone. The Floodplain Administrator also is responsible for planning and managing citywide flood risk reduction projects.

Emergency
Management/ Director of
Emergency Services
Yes City Manager’s Office/Director of Emergency Services: Maintains and updates the City of Diamond Bar Emergency Response Plan/activities. Coordinates local response and recover activities in the City’s Emergency Operation Center. Works closely with local, state, and federal partners to support planning and training; issues public information statements; and coordinate assistance to those affected by a hazard or disaster.

7.1.b
Packet Pg. 351
2022 City of Diamond Bar Local Hazard Mitigation Plan
92 Staff/Personnel
Resources
Available Department/Agency/Position
Community Planner Yes Community Development: Develops and maintains the City’s 2040 General Plan, including the public safety element. Develops local plans based on the City’s 2040 General Plan, to provide more specific guidance for the development of neighborhoods based on unique geographic concerns. Reviews private development projects, capital improvements projects, and other real property projects to ensure consistency and conformity with the City’s 2040General Plan. Anticipates and develops new mechanisms as needed, including plans, policies, and code changes. Utilizes City approved plans, policies, code provisions, and other regulations in reviewing proposed land uses.

Civil Engineer Yes Community Development/Engineer: Responsible for the maintenance and operation of equipment and facilities used in community development. Assists members of the public in facilitating project development.

GIS Coordinator Limited Contracted services limited in-house knowledge.

Grant Writer Yes City Manager’s Office

7.1.b
Packet Pg. 352
2022 City of Diamond Bar Local Hazard Mitigation Plan
93 Fiscal Capability
The ability of a local government to implement mitigation activities is often tied to funding available to establish policies and implement projects. Such funding generally comes from local revenue and financing and from outside grants. Costs associated with mitigation activities range from staffing and administrative costs to those required for project implementation. As part of the plan update process, the HMC reviewed and updated changes that have occurred in the City’s fiscal capabilities since the last plan update.

Financial resources (other than grants) available to the City to support the implementation of hazard mitigation management actions are outlined in Table 40: Fiscal Capabilities.

Table 35: Fiscal Capabilities
Financial Resources Accessible or Eligible to
Use?
Capital Improvements Project Funding Yes
Authority to Levy Taxes for Specific Purposes Yes, must follow props Fees for water, sewer, gas, or electric services NA
Impact fees for new development Yes
Storm water utility fee NA
Incur debt through general obligation bonds and/or
special tax bonds
Yes
Incur debt through private activities NA
Community Development Block Grant Yes
Other federal funding programs Yes
State funding programs Yes
Public/Private partnership funding sources Yes, but not currently fully utilized
The capability assessment determined that the city has the planning, regulatory, administrative, technical, and fiscal tools, and resources necessary to implement hazard mitigation strategies.

NATIONAL FLOOD INSURANCE PROGRAM CONTINUED

COMPLIANCE
Diamond Bar participates in the National Flood Insurance Program (NFIP), which was created by Congress in 1968 to provide flood insurance at subsidized rates to homeowners who live in flood-prone areas. Community NFIP participation is optional, although property owners who live in nonparticipating communities that have FEMA mapped Special Flood Hazard Areas (flood-prone areas) will not be able to buy flood insurance through the program. Additionally, nonparticipating communities with mapped floodplains cannot receive federal grants or loans for development activities in flood-prone areas, and they are ineligible to receive federal disaster assistance to repair flood-damaged buildings located in mapped floodplains. Diamond Bar has participated in NFIP since 1980.

Although program participation is not a hazard mitigation action to be included in the mitigation strategy per se, the City will continue to participate in NFIP and continue

7.1.b
Packet Pg. 353
2022 City of Diamond Bar Local Hazard Mitigation Plan
94 enforcement of the City’s Floodplain Management regulations (Municipal Code Section

18.108.110-210). This includes:
 Identifying the purpose of the floodplain regulation(s), as well as current and proposed ways to reduce flood losses.
 Serving as a mechanism for identifying flood hazard areas and related flood mapping issues.
 Oversees permit requirements for current and projected development projects.  Inspect all development for continued compliance with city code.  Applies development standards for flood-prone areas that minimize personal injury and property damage; and maintains documentation and risk analyses required for projects developed in these areas.
 Assist residents in obtaining information on flood hazards, flood maps, flood insurance and proper mitigation measures.

In an effort to meet NFIP requirements, Diamond Bar will make updates and revisions to Floodplain Management regulations as it deems necessary. These updates and revisions may be prompted by changes in local demographics; shifts in land use; trends such as the frequency and intensity of flood events; and other factors that may warrant municipal action.

The city will also continue to incorporate into future planning documents, including HMP updates, changes to the locations and designations of mapped floodplains.

The City of Diamond Bar contains Special Flood Hazard Areas where 10 NFIP policies are in force. Total insurance coverage for these policies amounts to $2,910,000; however, no repetitive loss properties were identified by the City’s Floodplain Administrator. The city does not participate in the voluntary Community Rating System (CRS).

Table 36: FLOOD INSURANCE STATISTICS FOR CITY OF DIAMOND BAR

FLOOD INSURANCE STATISTICS FOR LOS ANGELES COUNTY
Jurisdiction Date of
Entry
Initial
FIRM
Effective
Date
# Of Flood
Insurance
Policies
as of
6/30/2014
Insurance
in Force
($)
Total
Annual
Premiums
($)
Claims,
11/1978 to
6/30/2014
Value of
Claims
paid,
11/1978 to
6/30/2014
($)
Diamond
Bar
12/02/80 10 2,910,000 3,774 3 6,806
Source: Los Angeles County Floodplains Management Plan

7.1.b
Packet Pg. 354
2022 City of Diamond Bar Local Hazard Mitigation Plan
95 Section 6: Mitigation Strategy
C. Mitigation Strategy
C1. Does the plan document each jurisdiction’s existing authorities, policies, programs and resources and its ability to expand on and improve these existing policies and programs? (Requirement §201.6(c)(3))
C2. Does the Plan address each jurisdiction’s participation in the NFIP and continued compliance with NFIP requirements, as appropriate? (Requirement §201.6(c)(3)(ii)) C3. Does the Plan include goals to reduce/avoid long-term vulnerabilities to the identified hazards? (Requirement §201.6(c)(3)(i))
C4. Does the Plan identify and analyze a comprehensive range of specific mitigation actions and projects for each jurisdiction being considered to reduce the effects of hazards, with emphasis on new and existing buildings and infrastructure? (Requirement §201.6(c)(3)(ii))
C5. Does the Plan contain an action plan that describes how the actions identified will be prioritized (including cost benefit review), implemented, and administered by each jurisdiction? (Requirement §201.6(c)(3)(iv)); (Requirement §201.6(c)(3)(iii)) C6. Does the Plan describe a process by which local governments will integrate the requirements of the mitigation plan into other planning mechanisms, such as comprehensive or capital improvement plans, when appropriate? (Requirement §201.6(c)(4)(ii))
The Mitigation Strategy
The Mitigation Strategy provides the blueprint for the participating jurisdictions to use in its goal of improving disaster resiliency by lessening vulnerability to identified hazards of concern. Identified Mitigation Goals and Objectives inform the development of appropriate mitigation strategies, or actions and initiatives, designed to avoid, minimize, and mitigate the impacts of natural and manmade disasters on the local population and property located in the planning area. Communities strengthen their resiliency by issuing building codes, zoning ordinances, and other regulatory activities. When communities review or update these planning mechanisms, the opportunity exists to identify whether mitigation strategies can be incorporated into policy changes. Such efforts go a long way to ensuring that the City will remain resilient when affected by known hazards.

HMC members participated in a virtual meeting on May 22, 2021, to start the mitigation strategy review. Topics covered include:
 A review and update of the Goals and Objectives from the 2004 LHMP.  Discussion of strategies included in the 2004 plan and the status of each mitigation action.
 Input about whether each 2004 action should be carried forward and included in the 2022 LHMP if not, the reason why.
 New mitigation strategies to be included in the updated plan.  Developing a minimum of two mitigation actions - each outlined in a mitigation action worksheet to fully describe a current or proposed mitigation strategy, including how the community benefits from each action implemented.

7.1.b
Packet Pg. 355
2022 City of Diamond Bar Local Hazard Mitigation Plan
96 The HMC decided that the planning area mitigation priorities should remained the same, but the Goals and Objectives and list of mitigation actions could be streamlined.

Goals and Objectives
The updated Goals and Objectives were also reviewed to ensure that they broadly align with the goals of the City’s General Plan, 2019 Los Angeles County Hazard Mitigation Plan, and 2018 State Hazard Mitigation Plan (SHMP).

Table 37: 2022 City of Diamond Bar LHMP Goals and Objectives 2022 Diamond Bar Local Hazard Mitigation Plan Goals and Objectives Goal 1: Protect Life and Property
Objective 1.1: Implement activities that assist in protecting lives by making homes, businesses, infrastructure, critical facilities, and other properties more resistant to losses from natural hazards.

Objective 1.2: Reduce losses and repetitive damages for chronic hazard events while promoting insurance coverage for catastrophic hazards.

Objective 1.3: Improve the level of hazard assessment data to make recommendations for policies to discourage new development in high hazard areas; and to encourage preventative measures for existing development in areas vulnerable to natural hazards.

Goal 2: Enhance Public Awareness
Objective 2.1: Develop and implement education and outreach programs to increase public awareness of the risk associated with natural hazards.

Objective 2.2: Provide information on education tools, partnership opportunities, and funding resources to assist in implementing mitigation activities.

Goal 3: Preserve Natural Systems
Objective 3.1: Balance natural resource management, and land use planning with natural hazard mitigation actions designed to protect life, property, and the environment Objective 3.2: Preserve, rehabilitate, and enhance natural systems to serve natural hazard mitigation activities designed functions
Goal 4: Encourage Partnership and Implementation
Objective 4.1: Strengthen communication and coordinate participation among and within public agencies, citizens, non-profit organizations, business, and industry to gain a vested interest in implementation
Objective 4.2: Encourage leadership within public and private sector organizations to prioritize and implement local and regional hazard mitigation activities Goal 5: Enhance Emergency Services
Objective 5.1: Establish policy to ensure mitigation projects for critical facilities, services, and infrastructure.

Objective 5.2: Strengthen emergency operations by increasing collaboration and coordination among public agencies, non-profit organizations, business, and industry.

5.3: Coordinate and integrate natural hazards mitigation activities, where appropriate, with emergency operations plans and procedures.

7.1.b
Packet Pg. 356
2022 City of Diamond Bar Local Hazard Mitigation Plan
97 The City completed a two-part process to update the Mitigation Action Plan strategy for the 2022 plan update:
 The HMC considered the findings of the risk and capabilities assessments to consider new mitigation actions/measures.
 The group reviewed and provide updates on the status and relevance of each action provided in the previous plan to determine which measures have been completed; would be carried forward to the 2022 Plan; or deleted. This also included a discussion of changes in local priorities since the last plan update. Documentation of this process is provided as Worksheet 4 in Appendix D.

Incorporation into Existing Planning Mechanisms
The primary mechanism for incorporation of the mitigation plan requirements is through the City’s General Plan. Other key plans for incorporation includes, but are not limited to:
 Diamond Bar Emergency Operations Plan (EOP), which focuses on the effective preparedness and response to hazard events that occur within the city.

Incorporation of relevant content from this plan into the EOP ensures consistency regarding the hazards addressed in both plans.
 Diamond Bar Capital Improvement Plan (CIP) identifies key infrastructure investments throughout the city that may include hazard mitigation elements.

Incorporation of mitigation planning elements into the CIP may assist with enhancing infrastructure investment through additional funding and/or modification of improvements to include hazard mitigation elements.

Review and Evaluation of a Range of Mitigation Actions
The process of selecting and prioritizing mitigation actions began with each member of the HMC developing a “wish list” that considered community survey responses and stakeholder input. Individual “wish lists” were consolidated into a single list of mitigation actions/projects.

To narrow down the list to measures/actions for inclusion in the 2022 LHMP update, the HMC initially considered three criteria:
 What actions had the most serious consequences if not implemented?  What actions could be implemented by existing staff with funding resources available internally (or externally)?
 What actions responded to the primary concerns of the community? Mitigation actions are specific projects, activities, and processes taken to reduce long-term risk and lessen impacts to people and property from identified hazards. Implementing mitigation actions helps the community achieve the plan’s primary goal of fostering risk reduction. The primary types of mitigation actions that were considered include:
 Local plans and regulations
 Structure and infrastructure projects
 Natural system protection and education
 Community awareness programs
Building on the mitigation actions identified in the City’s General plan and the previous LHMP, the HMC reviewed and analyzed a comprehensive range of mitigation actions and

7.1.b
Packet Pg. 357
2022 City of Diamond Bar Local Hazard Mitigation Plan
98 projects. This HMC consulted the FEMA resource Mitigation Ideas: A Resource for Reducing Risk for Natural Hazards (January 2013) to expand the scope of activities for consideration.

The comprehensive range of potential activities included in Mitigation Ideas enabled the HMC to analyze and evaluate different mitigation measures, including a mixture of structural and non-structural activities. In general, all activities considered may be classified under one of the following six (6) broad categories of mitigation techniques provided in Table 43:

Mitigation Actions/Techniques.

Table 38: Mitigation Actions/Techniques
Mitigation
Actions
Techniques
Description
Prevention Preventative activities are intended to keep hazard impacts from worsening and are typically administered through government programs or regulatory actions that influence the way land is developed and buildings are built. They are particularly effective in reducing a community’s future vulnerability, especially in areas where development has not occurred, or capital improvements have not been substantial.

Examples includes planning and zoning, building codes, open space preservation, floodplain regulations, stormwater management regulations, drainage system maintenance, capital improvement programs, and riverine/fault zone setbacks.

Property
Protection
Property protection measures involve the modification of existing buildings and structures to help them better withstand the forces of a hazard, or removal of the structures from hazardous locations.

Examples include property acquisition and demolition; structure relocation; building elevation; critical facilities protection; retrofitting (e.g., wind proofing, floodproofing, seismic design techniques, etc.); the addition safe rooms, shutters, and shatter- resistant glass; and purchasing property insurance.

Natural
Resource
Protection
Natural resource protection activities reduce the impact of natural hazards by preserving or restoring natural areas and their protective functions. Such areas include floodplains, wetlands, steep slopes, and sand dunes. Parks, recreation, or conservation agencies and organizations often implement such protective measures. Examples include floodplain protection; watershed management; riparian buffers; forest and vegetation management (e.g., fire resistant landscaping, fuel breaks, etc.); erosion and sediment control; wetland preservation and restoration; habitat preservation; and slope stabilization.

Structural
Projects
Structural mitigation projects are intended to lessen the impact of a hazard through construction projects. They are usually designed by engineers and managed or maintained by public works staff. Examples include reservoirs; dams/levees/dikes/floodwalls;
diversions/detention/retention; channel modification; and building and maintaining storm sewers systems.

Emergency
Services
Although not typically considered a “mitigation” technique, emergency service measures minimize the impact of a hazard event on people and property. These commonly are actions taken immediately prior to, during, or in response to a hazard event. Examples include warning systems; evacuation planning and management; emergency response training and exercises; sandbagging (flood protection; and installing temporary shutters to provide wind protection.

7.1.b
Packet Pg. 358
2022 City of Diamond Bar Local Hazard Mitigation Plan
99 Mitigation
Actions
Techniques
Description
Public
Education and
Awareness
Public education and awareness activities are used to advise residents, elected officials, business owners, potential property buyers, and visitors about hazards, hazardous areas, and mitigation techniques they can use to protect themselves and their property. Examples of measures to educate and inform the public include outreach projects; a speaker series or demonstration events; information about hazard mapping; real estate disclosures; resources made available in the public library; educational programs for children; and hazard expositions.

Mitigation Approach
In developing and ranking the 2022 mitigation actions, the City elected to use the FEMA recommended STAPLEE evaluation criteria tool as outlined in the FEMA Local Mitigation Planning Handbook (March 2013). Each criterion is shown below.

Table 39: STAPLEE Mitigation Ranking Criteria
STAPLEE Mitigation Action Ranking Criteria
Used in the 2022 City of Diamond Bar Hazard Mitigation Planning Process Criteria Description
S Social Consider public acceptance and support of the mitigation measure T Technical Evaluate whether the proposed action is technically feasible A Administrative Evaluate the anticipated staffing, funding, and maintenance requirements of the mitigation measure
P Political Determine the local political leadership’s support of the mitigation measure
L Legal Evaluate the community’s legal authority to implement a mitigation measure
E Economic Consider the cost-effectiveness of the action, potential funding sources, and the potential impact on local economic conditions E Environmental Evaluate how the action affects local environmental concerns Source: FEMA Local Hazard Mitigation Planning Guide
As part of the economic evaluation of mitigation action, participants analyzed actions in terms of the overall costs, measuring whether the potential benefit to be gained from the action outweighed all costs associated with it. As a result of this exercise, priority was assigned to each mitigation action by marking them as High (H), Moderate (M), or Low (L). An action that is ranked as “High” indicates that the action will be implemented as soon as funding is received. A “Moderate” action may not be implemented right away depending on the cost and number of citizens served by the action. Actions ranked as “Low” indicate that they will not be implemented until “High” and “Moderate” actions have been considered for funding, or, a future disaster occurs that moves the ranking of the action to a higher priority.

7.1.b
Packet Pg. 359
2022 City of Diamond Bar Local Hazard Mitigation Plan
100
Mitigation Action Plan
The mitigation action plan identifies short and long-term action items developed based on hazard data collection and research, and the public participation process, including the use of a community survey. Mitigation actions may be considered for funding through federal, state and local funding sources. A detail list of potential funding sources is provided in Appendix F. To ensure that each identified activity is implemented, each action item includes information on the expected timeline and the coordinating agency or position. Upon implementation, the coordinating agency may look to partner with other organizations for resources and technical assistance.

7.1.b
Packet Pg. 360
2022 City of Diamond Bar Local Hazard Mitigation Plan
101
Current and Proposed Mitigation Action Items
Tables 45 and Table 46 respectively show the status of mitigation actions included in the 2004 Plan, and new actions developed for inclusion in the 2022 HMP Update.

Table 40: Status Summary of City of Diamond Bar 2004 Mitigation ActionsMitigation Action Items Status of Mitigation Actions Included in the 2004 City of Diamond Bar Hazard Mitigation Plan Status Updates: C=Completed; I=In progress; N=No longer relevant; M-Move forward for inclusion in the 2022 Hazard Mitigation Plan NHMP Implementation Structure Status
Update
Mitigation Action 1.1 Coordinator and Action
Committee
Designate a Hazards Mitigation Coordinator and a Natural Hazards Mitigation Action Committee to oversee NHMP implementation.

C
Mitigation Action 1.2 Implementation Options for
Hazards Mitigation
Secure necessary funding to implement hazards mitigation and response efforts
M
Mitigation Action 2.1 Maintain Integrity of
Emergency Operations Center
System
Maintain the system of the Emergency Operations Center (City Hall) with alternative back-up facilities (Diamond Bar Center, Heritage Park Community Center) to be activated in the event the central facility is impaired. Because City government operations may be affected if back-up locations must be activated, develop the portable EOC-in-a-box Program and train staff in its use.

Mitigation Action 3.1 Communication/ Early
Warning Systems and Local
Consideration
Review the disaster preparation, response, and early warning programs of neighboring jurisdictions, agencies and utilities servicing the community.

Also contact private companies (including railroads) to ensure that the needs of Diamond Bar are addressed in planning and infrastructure improvement initiatives. Advocate making the City a primary recipient of early hazard warning support and renew or establish communication protocols.

C

7.1.b
Packet Pg. 361
2022 City of Diamond Bar Local Hazard Mitigation Plan
102
Table 40: Status Summary of City of Diamond Bar 2004 Mitigation ActionsMitigation Action Items Status of Mitigation Actions Included in the 2004 City of Diamond Bar Hazard Mitigation Plan Status Updates: C=Completed; I=In progress; N=No longer relevant; M-Move forward for inclusion in the 2022 Hazard Mitigation Plan NHMP Implementation Structure Status
Update
Mitigation Action 4.1 Develop Geographic
Information System (GIS)
Program Capability for
Improved Mapping and
Planning
To aid with Disaster planning and preparation, the City needs to consider securing a Geographic Information System (GIS). A GIS program would both benefit Emergency Services and Disaster preparation and serve as a resource for all City departments. GIS is a method to visualize, manipulate, analyze, and display spatial data. It can be utilized to develop "Smart Maps,” predict future trends, and monitor environmental concerns. GIS would greatly improve Diamond Bar's capability to mitigate natural hazards and plan for reducing vulnerabilities.

C
Mitigation Action 5.1 Emergency Preparedness
Campaign
Continue implementing customized public education campaign for residents and businesses about appropriate emergency preparedness measures and what to do in the event of a disaster. Develop a special themes and topics to increase awareness.

M
Mitigation Measure

5.2 Community Emergency
Volunteers
Enhance involvement and partnership with Community Emergency Response Team (CERT) program, the Diamond Bar Amateur Radio System, (DBARS), and Neighborhood Watch Organizations to build and train teams of community residents, leaders, and stakeholders to assist with emergency response and first aid. Make use of existing community networks to enlist participants.

N
Mitigation Action 6.1 Reduced Wildfire Threat Continue existing programs requiring use of fire-resistant roof materials, brush clearance, and weed abatement and landscaping programs, along with periodic inspection by County Fire Department personnel, in existing developments located in and around areas prone to wildfire.

M
Mitigation Action 6.2 Landslide Prevention Prioritize routine maintenance and repairs of water and sewer storm drain lines in and around landslide prone areas to avoid long-term leaks that saturate and de-stabilize earth materials to the point of dangerous and destructive landslides.

I

7.1.b
Packet Pg. 362
2022 City of Diamond Bar Local Hazard Mitigation Plan
103
Table 40: Status Summary of City of Diamond Bar 2004 Mitigation ActionsMitigation Action Items Status of Mitigation Actions Included in the 2004 City of Diamond Bar Hazard Mitigation Plan Status Updates: C=Completed; I=In progress; N=No longer relevant; M-Move forward for inclusion in the 2022 Hazard Mitigation Plan NHMP Implementation Structure Status
Update
Mitigation Action 6.3 Landslide Prevention-Code
Compliance,
Interdepartmental
Communication/Public
and Contractor
Education
Continue to require that all
hillside/steep slope
construction and/or
improvements be reviewed by
a Soils and Geotechnical
Engineer for soil stability.

Continue communication and
coordination between the
City's Engineering, Planning,
and Building & Safety
Departments to address
proposed developments in
areas with slope stability risks.

I
Mitigation Action 6.4 Flood Prevention Maintain routine maintenance of down and bench drains in and around residential and commercial areas to avoid accumulation of debris which could lead to dangerous and destructive flooding.

I
Mitigation Action 6.5 Earthquake Preparedness Encourage reduction of nonstructural and structural earthquake hazards in homes, schools, businesses, and government offices
I
Mitigation Action 6.6 Earthquake Understanding Improve knowledge of Earthquake hazard areas and understanding of vulnerability and risk to life and property in hazard-prone areas.

I
Mitigation Action 6.7 Earthquake Construction
Design
Encourage construction and subdivision design that can be applied to steep slopes to reduce the potential adverse impacts from development I

7.1.b
Packet Pg. 363
2022 City of Diamond Bar Local Hazard Mitigation Plan
104
Table 40: Status Summary of City of Diamond Bar 2004 Mitigation ActionsMitigation Action Items Status of Mitigation Actions Included in the 2004 City of Diamond Bar Hazard Mitigation Plan Status Updates: C=Completed; I=In progress; N=No longer relevant; M-Move forward for inclusion in the 2022 Hazard Mitigation Plan NHMP Implementation Structure Status
Update
Mitigation Action 6.8 Earthquake Building Codes Review and revise building codes for any development in Earthquake prone areas
I
Mitigation Action 6.9 Windstorm Preparedness Maintain local City and utility awareness of tree pruning and Fire Code Sections relevant to wind-resistant utility operations
I
Mitigation Action 7.1 Accelerated Emergency
Response for Vulnerable
Populations
Many of the mitigation actions established in the NHMP will act to reduce risks associated with the vulnerable populations in the City, including schools, persons in daycare or senior care facilities, and vulnerable populations. Additionally, focused response efforts may be needed in the event of disaster to ensure the safety of persons in vulnerable or hard to access areas, as well as increase planning and response capabilities.

M
Mitigation Action 8.1 Diamond Bar Emergency
Preparedness Plan
Continue to implement the Diamond Bar Emergency Operations Plan, which functions as the City's manual for communication protocol in the events of disaster. Update as needed for consistency with the State Standardized Emergency Management System (SEMS) Multi-hazard Functional Plan, evolving inter-agency protocols and the NHMP.

C
Mitigation Action 8.2 City SEMS Planning and
Training
Continue to implement the Diamond Bar SEMS Plan, which functions as the City's manual for communications protocol in the event of a disaster.

Update as needed for consistency with the State's SEMS Plan, evolving inter-agency communication protocols and NHMP
C

7.1.b
Packet Pg. 364
2022 City of Diamond Bar Local Hazard Mitigation Plan
105
Table 40: Status Summary of City of Diamond Bar 2004 Mitigation ActionsMitigation Action Items Status of Mitigation Actions Included in the 2004 City of Diamond Bar Hazard Mitigation Plan Status Updates: C=Completed; I=In progress; N=No longer relevant; M-Move forward for inclusion in the 2022 Hazard Mitigation Plan NHMP Implementation Structure Status
Update
Mitigation Action 8.3 Emergency Preparedness
Drills
Pursuant to the City's Emergency Preparedness Plan, conduct emergency preparedness and response drills for mock major earthquake events-the natural hazards with the greatest potential for injury, life loss, property damage and service interruptions. Drills should test disaster response systems and communication protocols. When preparing the drills, consider the wide range of potential risks associated with critical facilities and vulnerabilities. Include City officials and staff, utility providers emergency response stakeholders and representatives of vulnerable facilities.

M
Mitigation Action 8.4 City Hall Life Safety Planning
and Evacuation Exercises
Update life safety preparedness plans conduct employee training and hold emergency evacuation drills in conjunction with AQMD at City Hall and at all other City facilities on an annual basis.

C

7.1.b
Packet Pg. 365
2022 City of Diamond Bar Local Hazard Mitigation Plan
106
Table 41: City of Diamond Bar 2022 HMP Update: Proposed New Mitigation Actions New Actions for the 2022 City of Diamond Bar Hazard Mitigation Plan Update Action # Action Risk Reduction Benefit Hazard(s)
Addressed
Estimate
d Cost
Agency/
Department
Priority
Ranking
Time to
Implement
(months)
Potential
Funding
Source(s)
1 Adopt and enforce
updated building
codes for all new
construction and
reconstruction.

Protect public buildings,
strengthen new residential and
commercial construction, and
reduce risk to public health,
safety and welfare
Flood,
Earthquake
s, Heavy
Rains,
Severe
Winds,
Landslides,
Tornado
$25,000 Systems
Engineering,
Stormwater
Department,
Floodplain
Management
H Ongoing as
part of the
Building
Code
update
process
City Budget
2 Retrofit all new and
existing critical
facilities.

Protect all new and existing
critical facilities from the
potential impact of identified
hazards.

All hazards Systems
Engineering,
Stormwater
Department,
Public Works,
Floodplain
Management
Ongoing as
part of the
Building
Code
update
process
BRIC,
HMGP,
City budget
Other
3 Prepare a joint plan/
agreement with
Walnut Valley Water
District to outline
water usage
limitations, control,
and outreach plan
during a drought.

To preserve drinking water
during times of drought. Inform
the public about water
conservation.

Drought,
Extreme
Heat
$3,000 Public
Information,
Public Works
M 1-Year City Budget

7.1.b
Packet Pg. 366
2022 City of Diamond Bar Local Hazard Mitigation Plan
107
New Actions for the 2022 City of Diamond Bar Hazard Mitigation Plan Update Action # Action Risk Reduction Benefit Hazard(s)
Addressed
Estimate
d Cost
Agency/
Department
Priority
Ranking
Time to
Implement
(months)
Potential
Funding
Source(s)
4 Prepare earthquake
action plan
identifying most
vulnerable
infrastructure/utilities
and planning
emergency routes
bypassing the
infrastructure if
damaged.

Provides the ability to move
emergency management
personnel to help residents after
an earthquake.

Earthquake
s
$5,000 Public Works M 1-Year City Budget
5 Prepare map of Cityowned storm drain
facilities and perform
annual inspections/
maintenance.

Prevent the drains from
becoming clogged and assist in
reducing flooding during heavy
rains.

Flooding,
Heavy
Rains
$1,000
up front
and
$8,000
annually
Public Works,
Information
Systems
M 3 Months City Budget
6 Prepare an
Emergency
Management Plan
for Sewer spill
(pump stations).

Provides a plan for prevention
and clean up.

Hazardous
Material
$20,000 Public Works M 6 Months City Budget
7 Equip all City
vehicles with spill
control package
Allows for faster clean up to
protect the citizens and
environment.

Hazardous
Material
$10,000 Public Works M 2 Months City Budget
8 Ensure annual LA
County Fire public
correspondence and
fire hazard mitigation
landscaping occurs
Reduces the fuel for wildfires
and educates the public by
sharing their landscaping tricks.

Wildfire $0 Public Works,
Public
Information
H Ongoing N/A

7.1.b
Packet Pg. 367
2022 City of Diamond Bar Local Hazard Mitigation Plan
108
New Actions for the 2022 City of Diamond Bar Hazard Mitigation Plan Update Action # Action Risk Reduction Benefit Hazard(s)
Addressed
Estimate
d Cost
Agency/
Department
Priority
Ranking
Time to
Implement
(months)
Potential
Funding
Source(s)
9 Prepare an Urban
Forestry Initiative
Inventory for the City
Unknown at present time Wildfire $30,000 Public Works H 1 year City Budget or Grants
10 Prepare a plan to
keep
PPE/Disinfectant/etc
. in stock
Help prevent a virus outbreak
and provides sanitation to
citizens and first responders as
needed.

Epidemic/P
andemic/C
OVID-19
$10,000 Public Works M Ongoing City Budget
11 Purchase
emergency flood
mitigation BMP’s
(gravel bags, k-rail,
etc.) and stockpile
for emergency use.

Keeps a supply on hand 2to help
direct any flood waters away
from homes and businesses.

Landslide $50,000 Public Works L 4 Months City Budget
12 Continue requiring
slope analysis and
improvements where
necessary on
development
projects.

Provides stability of the hills and
reduces the possibility of
landslides.

Landslide $0 Public Works H Ongoing City Budget
/ Develop
application
fees
13 Provide Back-up
Generator for critical
facilities and schools
Allows for first responders to
continue operations and help the
community.

Heavy
Rains,
Severe
Winds
Flood
$50,000 City
Manager’s
Office,
School
Districts
H 1-2 years BRIC,
HMGP,
City budget
14 Annual Weed
Abatement
Minimize wildfire risk to
structures in urban/wildland
interface areas.

Wildfire $8,000 Public Works L 12 months City budget

7.1.b
Packet Pg. 368
2022 City of Diamond Bar Local Hazard Mitigation Plan
109
New Actions for the 2022 City of Diamond Bar Hazard Mitigation Plan Update Action # Action Risk Reduction Benefit Hazard(s)
Addressed
Estimate
d Cost
Agency/
Department
Priority
Ranking
Time to
Implement
(months)
Potential
Funding
Source(s)
15 Erosion Control Allows for environmental
stability, and beautification of the
city.

Earthquake
s, Flooding,
Landslide
$4,000 Public Works M 12 Months City budget
16 Implementation
Options for Hazards
Mitigation
Secure necessary funding for
implementation of hazards
mitigation action as follows:

All Hazards City
Manager’s
Office
M Ongoing FEMA
HMA,
Other
grants
17 Emergency
Preparedness
Campaign
Continue implementing
customized public education
campaign for residents and
businesses about appropriate
emergency preparedness
measures and what to do in the
event of a disaster. Develop a
special themes and topics to
increase awareness of hazards.

All Hazards City
Manager’s
Office
M Ongoing City Budget
18 Reduced Wildfire
Threat
Continue existing programs
requiring use of fire-resistant
roof materials, brush clearance,
and weed abatement and
landscaping programs, along
with periodic inspection by
County Fire Department
personnel, in existing
developments located in and
around areas prone to wildfire, to
avoid structural damage and/or
injury.

Wildfire Public
Works/Buildin
g Department
H Ongoing City Budget

7.1.b
Packet Pg. 369
2022 City of Diamond Bar Local Hazard Mitigation Plan
110
New Actions for the 2022 City of Diamond Bar Hazard Mitigation Plan Update Action # Action Risk Reduction Benefit Hazard(s)
Addressed
Estimate
d Cost
Agency/
Department
Priority
Ranking
Time to
Implement
(months)
Potential
Funding
Source(s)
19 Accelerated
Emergency
Response for
Vulnerable
Populations
Many of the mitigation actions
established in the LHMP will act
to reduce risks associated with
the vulnerable populations in the
City, including schools, persons
in daycare or senior care
facilities, and vulnerable
populations. Additionally,
focused response efforts may be
needed in the event of disaster
to ensure the safety of persons
in vulnerable or hard to access
areas, as well as increase
planning and response
capabilities.

All Hazards $2,000 City
Manager’s
Office, Public
Information
H 1-Year City Budget

7.1.b
Packet Pg. 370
2022 City of Diamond Bar Local Hazard Mitigation Plan
111
New Actions for the 2022 City of Diamond Bar Hazard Mitigation Plan Update Action # Action Risk Reduction Benefit Hazard(s)
Addressed
Estimate
d Cost
Agency/
Department
Priority
Ranking
Time to
Implement
(months)
Potential
Funding
Source(s)
20 Emergency
Preparedness Drills
Pursuant to the City's
Emergency Preparedness Plan,
conduct emergency
preparedness and response
drills for mock major earthquake
events-the natural hazards with
the greatest potential for injury,
life loss, property damage and
service interruptions. Drills
should test disaster response
systems and communication
protocols. When preparing the
drills, consider the wide range of
potential risks associated with
critical facilities and
vulnerabilities. Include City
officials and staff, utility
providers, emergency response
stakeholders and
representatives of vulnerable
facilities.

All Hazards $2,000 City
Manager’s
Office
M 2-Years City Budget

7.1.b
Packet Pg. 371
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 112
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
Section 7: Plan Maintenance
The formal plan maintenance process that will ensure the City of Diamond Bar 2022 Hazard Mitigation Plan is implemented, monitored, evaluated, and updated so the plan remains a dynamic relevant document. The plan maintenance process includes a schedule for monitoring and evaluating the Plan annually and producing a plan revision every five years. This section describes how the City will integrate public participation throughout the plan maintenance process. It consists of the following subsections

1. Overview.

2. Monitoring, Evaluating and Updating.

3. Incorporation into Existing Planning Mechanism.

4. Method for Continued Participation.

Plan Maintenance Overview
The City Manager’s Office will serve as the lead agency responsible for implementing the plan maintenance process. The City’s HMC will be responsible for implementing the strategies outlined in this Plan, and for updating and maintaining the Plan according to the guidelines set forth below. The city will use the Plan’s goals, as well as continued analysis of hazard risks and capabilities, to weigh the availability of community resources against the cost and benefit for each mitigation action. That is to say, the action will be reviewed against the staff time and financial resources needed to implement it. The city understands the value of this Plan and the extent to which plan elements lend themselves to mitigating hazards of concern. The City intends to maintain, update, and implement the 2022 HMP using the following method and schedule.

Monitoring, Evaluating and Updating the Plan
The City of Diamond Bar HMC will keep the Plan current by monitoring, evaluating, and updating the Plan. FEMA defines these efforts as follows:

1. Monitoring: Tracking the implementation of the plan over time.

2. Evaluating: Assessing the effectiveness of the plan at achieving its stated purpose and goals.

3. Updating: Reviewing and revising the plan at least once every five years.

The City Manager’s Office is the oversight entity charged with ensuring that the Plan maintenance process is carried out. The City’s HMC is the planning group responsible for promoting ongoing coordination and community participation in the Plan maintenance process.

Monitoring the Plan
As directed by the City Manager or his/her designee, the City’s HMC representatives will collect information needed to monitor the Plan and revise it as needed.

7.1.b
Packet Pg. 372
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 113
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
Each mitigation action in this Plan is prioritized and assigned to a specific department, agency, or position, who will carry out the action when staff time and funding are available to support the action. Timelines are given for each mitigation action, where appropriate, and potential funding sources are identified. Additionally, each mitigation action is prioritized based on a common set of criteria, which enables jurisdictions to move specific actions forward as funding opportunities arise. Annual plan monitoring will help track progress on each proposed mitigation action.

The role of City Manager or his/her designee includes the following tasks:
 Schedule an annual meeting of the HMC.
 Develop meeting agendas.
 Schedule post-disaster event meetings with the HMC for Federally- and/or State declared disasters that result in significant damage sustained, or if the event revealed planning area vulnerabilities that need to be addressed.
 Provide information about recent hazard impacts and the current status of mitigation actions.  Invite other agencies/departments/stakeholders and the public to participate in meetings.  Coordinate with the HMC to communicate plan updates to the public when applicable. This may include activities such as, but not limited to, developing Plan amendments; completing mitigation actions; notifying the public of available mitigation program; and related efforts.

During annual meetings, the City’s HMC will address hazard-related concerns that may have arisen since the most recent Plan update; assess events affecting the city to determine if changes in the plan are required; and complete the monitoring and evaluation worksheets developed for the purpose of documenting the monitoring process.

If significant changes, updates, or amendments to the Plan are suggested by the City’s HMC, they will be documented and included as part of the Plan’s annual update.

Evaluating the Plan
The City Manager or his/her designee and the members of the City’s HMC will use the Plan Evaluation Checklist, (which is included in Attachment G), to evaluate the Plan and make recommendations for future Plan updates and enhancements. The Checklist will be completed annually.

The Plan Evaluation Checklist includes the following components:
 Evaluate the goals and objectives to ensure they address current and expected conditions.  Determine any changes in the nature or magnitude of risks identified in the Plan.  Evaluate current resources for adequacy in implementing the Plan.  Document implementation problems experienced by other agencies, including technical, political, legal or coordination issues.
 Evaluate the effectiveness of the HMC.

Three additional worksheets were developed and are included as attachments to this section.  Attachment B: Planning Considerations Worksheet.
 Attachment C: Mitigation Action Implementation Worksheet (listing status of mitigation actions identified by each jurisdiction).

7.1.b
Packet Pg. 373
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 114
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
 Attachment D: City of Diamond Bar HMC Meetings and Public Involvement Activities Log.

The Plan Evaluation Checklist, Planning Considerations Worksheet, and Mitigation Action Implementation Worksheet will be completed annually (at a minimum) and stored in Appendix G.

Updating the Plan
In accordance with federal regulations, the city’s LHMP is to be updated every five years. The City Manager or his/her designee will complete an annual progress report, as described in the Evaluation Section above, to improve the documentation of the progress made by the City on the strategies defined in this Plan. In doing so, the Plan will become more of a “living document” that is proactive and integrates with the planning area’s future initiatives.

Plan reviews will provide the city with an opportunity to evaluate those actions that have been successful, and to document potential losses avoided due to the implementation of specific mitigation measures. The plan review also provides the opportunity to address mitigation actions that may not have been successfully implemented as assigned and determine how they could be more feasibly implemented.

If a significant hazard event occurs, or if changes in regulations warrant an update of the Plan, the City Manager or his/her designee will meet with the HMC to determine the course of action to be used to update the Plan. If a Plan update is approved, the same procedures used in developing the original plan will be followed and will incorporate opportunities for the pubic to have input and provide comments.

Table 42: Method and Schedule for Maintaining and Updating Mitigation Plan Year 1
Year 2
Year 3
Year 4
Year 5
Annual Diamond
Bar HMC
Meeting
Annual Diamond
Bar HMC
Meeting
Annual Diamond Bar HMC
Meeting
Annual Diamond Bar
HMC Meeting to
initiate 5-year update
planning process
Diamond HMC
Meeting to
discuss plan 5-
year update
City proceeds
with mitigation
action
implementation.

City proceeds
with mitigation
action
implementation.

City proceeds with
mitigation action
implementation.

City proceeds with
mitigation action
implementation. And
City HMC
host a minimum
of 2 Planning
meetings.

7.1.b
Packet Pg. 374
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 115
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
Year 1
Year 2
Year 3
Year 4
Year 5
considers additional
mitigation projects.

City incorporates
this Plan into
other municipal
plans.

City incorporates
this Plan into
other municipal
plans.

City incorporates this Plan
into other municipal plans.

City incorporates this
Plan into other
municipal plans.

City incorporates
outreach
strategy,
including
municipal
meetings, public
workshops, and
public surveys.

City, in
coordination with
LA County and
CalOES, seeks
funding for
mitigation
projects.

City, in
coordination with
LA County and
CalOES, seeks
funding for
mitigation
projects.

City, in coordination with
LA County and CalOES,
seeks funding for mitigation
projects.

City, in coordination
with LA County and
CalOES, seeks
funding for mitigation
projects.

City, in
coordination with
LA County and
CalOES, seeks
funding for
mitigation
projects.

City initiates
mitigation
planning review
process for
lessons learned.

City initiates
mitigation
planning review
process for
lessons learned.

City initiates mitigation
planning review process for
lessons learned.

City initiates
mitigation planning
review process for
lessons learned.

City HMC hosts
meetings for
additional
stakeholders
such private
businesses and
relevant
speakers.

7.1.b
Packet Pg. 375
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 116
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
Year 1
Year 2
Year 3
Year 4
Year 5
City HMC will
hold a meeting
following any
largescale
disasters to
discuss potential
mitigation
actions.

City HMC will
hold a meeting
following any
largescale
disasters to
discuss potential
mitigation
actions.

City HMC will hold a
meeting following any
largescale disasters to
discuss potential mitigation
actions.

City HMC will hold a
meeting following
any large-scale
disasters to discuss
potential mitigation
actions.

City HMC will
hold a meeting
following any
large-scale
disasters to
discuss potential
mitigation
actions.

Incorporation into Existing Planning Mechanisms
Althrough the General Plan is the primary method of incorporating the LHMP into other planning mechanisms, the Capital Improvement Plan, and Building and Safety Codes will also incorporate mitigation actions as appropriate.

The integration process and schedule of incorporating elements of this Plan will vary based on the specific plan’s update cycle. The yearly mitigation meetings will provide an opportunity to track the progress on the integration of this Plan into local planning mechanisms.

Method for Continued Public Participation
Diamond Bar is dedicated to involving the public directly in the continual review and updates of the LHMP. Copies of the Plan will be catalogued and made available at City Hall and Los Angeles County Diamond Bar Public Library. The existence and location of these copies will be publicized in the Diamond Bar City News newsletter.

Public comments related to the Plan will be retained in the City Manager’s Office. In addition, copies of the Plan and any proposed changes will be posted on the city website. This site will also contain an email address and phone number to which people can direct their comments, recommendations, and concerns.

Additionally, if significant changes are required of the plan by CalOES/FEMA, the City HMC will notify the public and encourage their participation in meetings to provide input and review any changes. The City HMC may also send notifications to the public on plan amendments, completion of mitigation actions, and notification of programs available for mitigation. To this end, the public will remain involved in the implementation of this plan.

Public involvement during the plan’s monitoring and evaluation process will be fostered through the strategies listed below:

7.1.b
Packet Pg. 376
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 117
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
 City’s website and/or social media outlets.
 Public meetings advertised in local newspapers and local websites.  Copies of this plan will be available for public view in City Hall as deemed appropriate by City staff.

During the five-year planning cycle, City HMC will meet with various agencies, organizations, and stakeholders to strengthen relationships; identify partnering opportunities to address identified mitigation actions; and increase awareness of the capabilities these groups can provide. The HMC will also use conferences local and regional workshops, and seminars regarding emergency preparedness, response and recovery operations as another opportunity to meet with local agencies, surrounding communities and state agencies to discuss mitigation strategies/actions identified in the Plan.

7.1.b
Packet Pg. 377
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 118
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
APPENDIX A: Adoption Resolution
(Attached to Staff Report)

7.1.b
Packet Pg. 378
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 119
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
APPENDIX B: FEMA Plan Review Tool
(Attached to Staff Report)

7.1.b
Packet Pg. 379
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 120
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
APPENDIX C: Planning Meeting Documents
Diamond Bar/IEM
Administrative Kick-off Meeting (2) Minutes
Date: February 18, 2021
City of Diamond Bar Local Hazard Mitigation Plan (LHMP) Update Diamond Bar Planning Team Kick-off Meeting
10:00 AM PST/2:00 PM EST
February 17-18, 2021
Welcome
Introductions
Hazard Mitigation Overview
Project Overview
Roles and Responsibilities
Planning Process
Project Schedule
Review of Potential Hazards
Next Steps
Other Issues/Concerns
Questions/Comments
Participants
Representing City of Diamond Bar
Anthony Santos, Assistant to City
Manager
Dannette Allen
Raymond Tao
Representing IEM
Sheila Hascall, Mitigation Programs
Manager
Leroy Thompson, Project Manager
Elizabeth Burnett- Junior Planner
Stakeholders
Lt. Steve Tousey
Robert Cruz, SoGas
Miguel Gamboa, SoGas
Diana Monsano-Garcia
Marrissa B Castro-Salvati
Started on time at 2pm eastern time and ended at 3pm eastern time.

Introduction:

Mr. Thompson introduced himself and asked to do a roll call for the beginning of the meeting. He discussed the agenda and what will be covered in the presentation continues and when we get to the end of the agenda, we will cover what additional hazards should be included in the updated plan.

Mr. Santos and Mr. Thompson will be working hand in hand through this process and the participants are encouraged to reach out to either as needed with questions or concerns and provide feedback.

Question- asked to have the presentation emailed to them at the end of the presentation Answer- Yes, we will email them after the meeting
Hazard Overview
Mr. Thompson proceeded to provide the FEMA definition and overview of hazard mitigation, mitigation planning and the mitigation related grants. Mr. Thompson stated that we will discuss several of the FEMA Hazard Mitigation Assistance grants to include BRIC and other assistance grants in later slides. He also discusses the

7.1.b
Packet Pg. 380
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 121
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
Great Floods or Noah and the Arch. In this example he discussed how Noah followed a planning process similar to the one we will use to update the City’s plan.

Noah assessed the hazard-flooding, reviewed a comprehensive list of actions, selected best action and hazard was avoided.

Project Background/Objectives
Mr. Thompson continued and discussed the project background as well as the project objectives. These discussions included why the city needs to update its current 2004 hazard mitigation plan (HMP) to a new 2021 hazard mitigation plan. He also discussed the Disaster Mitigation Act of 2000 (DMA2K) as being the primary reason to be moving forward in updating this plan, and the benefits of having an up-to-date plan. In order to be eligible for FEMA Hazard Mitigation Assistance (HMA) funds a community must have a FEMA approved hazard mitigation plan. A current FEMA approved HMP will allow the City to be eligible for grants/funding to address some of the mitigation actions/projects that will result from our planning process.

This was followed with a discussion of the project objectives which included assuring that at the end of the planning process the City will have a FEMA approvable plan. This includes identifying hazards of concerns, greatest opportunities to reduce risk and fulfill public input requirements.

Mr. Thompson also stressed that it is the city’s plan, IEM staff is working on and making sure it is your plan not IEM plan when it’s completed. Mr. Thompson also stated we want to make sure the planning requirements are met and will be beneficial to the City moving forward.

Plan Section
Mr. Thompson proceeded and open a discussion on the planning process to include 5 planning phases/tasks.

These phases/tasks include planning process, hazard identification and risk assessment, mitigation strategy, plan maintenance, final draft plan.

He continued to review the steps and related activities that will be completed under each of the identified plan phases/tasks.

Phase 1-Planning Process
Mr. Thompson discussed activities that will addressed under this phase to include building the team, document how the plan is being updated, determine an outreach strategy, identify the capabilities assessment to include plans, programs policies regulations that can impact city’s ability to implement hazard mitigation program (what already exists). He also highlighted this part of the process will be data intensive and cross over the entire planning cycle.
• Establish a formal planning process
• Build the Team-Participation from a broad range of stakeholders • Documentation of planning activities
• Meetings (group, virtual, one-to-one)
• Input from Planning Committee and Stakeholders
• Integration with other state planning efforts
• Create an Outreach Strategy
• Capabilities Assessment - Existing policies, studies, plans, programs, etc.) Data Reviews and Collection
Statement and Question: Robert Cruz- mentioned community input and asked will it be in person meetings, and once finalized is the outcome going to be on the city website.

Answer: Mr. Thompson- initially we proposed a survey to the public about the plan and their feedback on what should be covered in it and posting the activities on the city website.

Second Answer: Mr. Santos- intent to post where we are going with the grant and progress on the website, and want to make sure that once approved it goes on to the website and maintenance as well after the 5 year Phase 2- Hazards Identification and Risk Assessment
Phases/Tasks 2- Hazards Identification and Risk Assessment- Mr. Thompson provided that the activities include a discussion on identifying and profiling hazards and the completion of a detail risk assessment.

Hazards Identification: Mr. Thompson discussed the need to identify and profile each hazard that can impact the city. He also reviewed the hazards identified in previous 2004 plan and stated that we will further discuss hazards later in the presentation.

7.1.b
Packet Pg. 381
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 122
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
Risk Assessment: Mr. Thompson discussed the elements to be included in the risk assessment to include critical facilities and updating capabilities assessment, impacts of changes in development, impacts of climate change and estimated losses.
• Critical facilities-lifelines includes a review and assessment of the City’s critical facilities and infrastructures and their vulnerable to identified hazards as well as vulnerable populations. This will also include a discussion of NFIP repetitive loss properties.
• Capabilities assessment will include a review of current regulations, that will support or hinder mitigation actions; Administration or government support; Education and outreach- is there a process to educate them or a way to disseminate information to them. NFIP- make sure it is addressed to meet FEMA requirements, participation, continued participation, and repetitive loss structures. The outcome is to assess the City’s ability to implement long term mitigation action plans, look at what is in place and if there is a conflict, and administrative capabilities to do them.
• The final section of the risk assessment will include a summary of potential losses.

Phases/Tasks 3- Mitigation strategy- Mr. Thompson provided that the risk assessment forms the foundation to this task. He reviewed the various steps involved in developing mitigation strategy and the mitigation action plan.

The Mitigation Strategy will include:
o Goals and objectives- see if the old goals and objectives are still relevant or what needs to be removed or added
o Review a comprehensive range of mitigation actions, from prevention, to protection, mitigation actions, etc.
o How to mitigate the hazards and repetitive loss structures, o Development of the mitigation action plan, what are we vulnerable to, what are the risks, prioritizing the projects, who is responsible, time frame for completion of those projects, o Work with them on the top 2 actions to give them an idea of how this works and needs to be completed.

Mr. Thompson also discussed the need to develop a strategy to address repetitive loss properties stating that FEMA is concern when it comes to flooding
He discussed the mitigation action plan to include all of the actions or projects that are considered important to the community and put them in a prioritized order to include time frame for completion, who is responsible for action and funding source.

There was also a discussion of Hazard Mitigation Assistance (HMA) funding sources from FEMA o PA-406-mitigation provides post-disaster funds that can be used to make additional improvements/upgrades to damage public structures where applicable and can provide mitigation actions that might not have been covered before.
o 404-Hazard Mitigation Grant Program (HMGP) provides post-disaster to complete mitigation related actions/projects.
o Flood Mitigation Assistance (FMA) provides pre-disaster funding to address retrofitting to flood-prone structures and infrastructure. These funds are provided on annually. o Pre-Disaster Mitigation (PDM)/ Building Resilient Infrastructure and Communities (BRIC) provides funding for mitigation related projects with an added focus on infrastructure projects.

Question: (Chat question) Robert Cruz- any assistance programs for earthquakes? Answer: Leroy- Yes there is funding for those.

Phases/Tasks 4- Plan Maintenance
Mr. Thompson discussed the plan maintenance process to include monitoring, evaluate and update the plan.

This section will include maintaining and updating the plan as well as tracking and reporting the status mitigation actions/projects.

Phases/Tasks 5- Draft Plan and Review Process
Mr. Thompson reviewed the process for developing the draft plan, approval by the planning committee (city of diamond bar) and then to the State OES and then to FEMA. If comments come back, we will handle them and

7.1.b
Packet Pg. 382
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 123
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
then send it back up to the state and then to FEMA and back again if is necessary. After final approval the community approves it then you get the final approved paperwork from FEMA The plan is not official until the city adopts the plan after FEMA approves it pending adoption.

What we want to do is finish a section and get that approved as we go along to quicken the process towards approval.

Roles and responsibilities
Mr. Thompson informed the participates that the Planning Coordination Team will include the City’s Point of Contact Anthony Santos or Dannette Allen, and IEM’s Point of Contact Leroy Thompson and Sheila Hascall being the second point of contact for IEM.

The Planning Team will include all individuals who participates in the planning process. The Team will additional subject matter experts, stakeholders, specialists as well as the public. o The plan should reflect the community and its needs.
o Comments from neighboring community comments so that we have it all covered o We will review the State HMP and the LA County HMP to make sure the City’s plan is consistent with statewide mitigation programs.

Timeline/Schedule
Mr. Thompson reviewed the project timeline and potential meeting schedule noting that they are tentative and can change. We also discussed the ability to add additional persons to the Planning Team if necessary.

Mr. Santos discuss conducting a potential work session/meeting with the City Council to make them aware of where we are in the process. He is not sure of the format of such meeting but will get back with the Team later. o Can add personnel if you think of others who want to participate, o Anthony- council planning workshop
o Update the council that they are working in the plan and that they are aware of where we are in the process, can be a study session if needed to discuss things more detailed, Review of Potential Hazards
Mr. Thompson asked the Team if additional hazards should be added to the plan. Mr. Santos stated that we can consider other human caused hazards to include COVID-19 and Hazardous Materials. Mr. Thompson asked about any type of hurricane force winds and Mr. Santos stated that they experience Sana Ana winds and had wildfires in 2020.

Next Steps
• Mr. Thompson stated that we will attempt to reuse as much data as possible from the 2004 plan and see what is still current and what needs to be updated. He additionally, he provided that we will be doing a series of one on one discussions with different agencies and team members to assist in our data collect efforts. • One of the first documents that we will be sending out is a survey of critical facilities that are in the 2004 plan and requesting assistance in updating information. We will work with the City to remove any sites from the list that do not reported for various reasons.
• Mr. Thompson provided an example of how we will move forward using flood hazard as an example. He stated we might have an individual meeting with Building and/or Public Works to discuss areas in community that flood on a routine base and are not included on the City’s FIRM.

Questions/Comments
• Mr. Santos – thanks the attendees for participating in the meeting and reminded the group to ask questions nothing is unimportant
• Mr. Thompson- we will be working with you to make sure all FEMA requirements are met and that it’s your plan not our plan
Thank you for participating
_____________________________________________________________________________________ Question/Statement: (Chat Question/Statement) Robert Cruz- make sure we work with local school and community colleges in neighboring communities
Answer: Leroy- we do recommend working with them

7.1.b
Packet Pg. 383
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 124
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
Chat suggestion: Marissa B Castro-Salvati- work with the chamber of commerce as they are a pulse of the business community
Chat Suggestion: Marissa B Castro-Salvati- Where other Utilities (water, cable, telecommunications) invited as well?
Anthony: they were
Question: Robert Cruz- during earthquakes, floods, etc., utilities are affected, if its significant gas, electric, might not comply with FEMA hazard but it would result in a response, this needs to be considered.

Question: Miguel Gamboa- Man made hazards, tampering with critical infrastructure.

Answer to both Roberts and Miguel’s questions: Leroy requested and email for Miguel’s and Roberts question to better answer it. (same basic question asked 2 ways)
Question: (chat question) Marissa- what about chemical hazards, Answer: Leroy- yes, they will be taken care of if the city wants to include them.

Question: Miguel/Robert -Would Anthony be interested in looking into the hazards that come from natural hazards.

Answer: Anthony- we will look into them and we might or might not place them in the plan, but we should look into them and see what needs to be done and how it relates to what we want to accomplish with this plan.

Statement: Diana- particular location in the city with an incident that is being referred to, it could have been a half mile to a mile explosion or shelter in place (power)
Suggested People to Invite into this planning process:

San Gabriel Chamber of Commerce
School District

7.1.b
Packet Pg. 384
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 125
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
APPENDIX D: Public Engagement
Public Engagement
Under FEMA guidelines, local hazard mitigation planning processes should create opportunities for members of the public to be involved in plan development—at a minimum, during the initial drafting stage and during plan approval. The HMC developed a virtual engagement strategy to guide all public engagement activities.

However, due to issues with COVID-19, in lieu of originally planned in-person public meeting were not able to be conducted. However, the City posted an online community survey on its website soliciting public comments/input on the planning process. The survey was posted online at https://www.allcounted.com/s?did=cfl5vyu9y58d7&lang=en_US. The figure below shows how the City announced the survey on its web site. The Community Survey was posted on the web site for two reasons:
to inform the general public that the 2022 LHMP was being updated; and to invite the public to give input on hazards of concern and how they have been affected by recent disaster events. The results of the Community Survey have been incorporated into the respective sections of the plan.

City announced the survey on its web site.

Survey Results Graph

7.1.b
Packet Pg. 385
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 126
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

1. What is the name of your city of neighborhood?
0 10 20 30 40 50 60 70
Diamond Bar
N/A
District 41
Long Beach
Series 1
Series 1

7.1.b
Packet Pg. 386
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 127
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

2. During the past 5 years, have you or someone in your household directly experienced a natural disaster? Examples include but are not limited to, Earthquakes, Severe Storms (including High Wind, Hail, Thunderstorms, and Lightning), Flood, Landslides, Wildfires, and Drought, or other types of disasters? 0 5 10 15 20 25 30 35
Yes
No/None
Wildfire
Landslide
Wildfire Air Contamination
Column1
Column1

7.1.b
Packet Pg. 387
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 128
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

3. If you responded to Question 2 with a “yes” answer, which of these natural disasters have you or someone in your household experienced in the past 5 years? Select all that apply. 14 12
1 0
3 5
11 4
Drought
Earthquake
Expansive Soils
Flood
Landlside
Severe Storms (including Thunderstorm, Hail, High Wind, and Lightning) Wildfire
Other please specify

7.1.b
Packet Pg. 388
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 129
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

4. Other (please specify) option from Question 3.
0 10 20 30 40 50 60
No/None/ N/A
This doesn’t make sense
COVID Pandemic
Drought
Economic Disaster due to inflation
Slab Leaks
Flood
I did not signify "other" as an issue
These issues do not particularly affect me
Fire
Civil Unrest
California in general
Brush fire on neighboring hills
Series 1
Series 1

7.1.b
Packet Pg. 389
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 130
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

5. How concerned are you about the following natural hazards affecting your community? Please indicate the level of threat you feel each hazard presents to property, or people in your neighborhood or business community.
0 5
10 15
20 25
30 35
40 45
Not Concerned Low Concern Neutral Slightly Concerned Very Concerned Chart Title
Drought
Earthquake
Expansive Soils
Flood
Landslide
Severe Storms (including Thunderstorm, Hail, High Wind, and Lightning) Wildfire

7.1.b
Packet Pg. 390
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 131
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

6. What is the most effective way for the City of Diamond Bar to communicate how you can better protect your home and household from natural disasters? Please select all that apply.

Column1
Newspaper Television Radio
Facebook/Other Social Media Schools Mail
Email Cell Phone Text Message
Fire/Rescure Department Public Workshops/Meetings Fact Sheet/Brochure Library Other

7.1.b
Packet Pg. 391
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 132
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

7. Other (please specify) option from Question 6.

No/None/ N/A
Excellent City website should be
maintained
PSA
E-Mail
Don’t Know
Text Message
Economic Disaster due to inflation and
govenrment tax increases in California
News
I specified the ones that apply for me
Cell
Door Hangers
Keep information brief and to the point
Emergency Notification System
Land Line (phone)
Local News Letter Works
Amber Alert System locolized to my city

7.1.b
Packet Pg. 392
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 133
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

8. In your opinion which of the following assets are most susceptible to the impact of natural hazards in your community? Please rank the community assets in order of vulnerability, with 1 being the most vulnerable to 6 being the least vulnerable.
0 5 10 15 20 25 30
Human-Loss of life and/or injuries
Economic-Business closures or job losses
Infrastructure-Damage to or loss of bridges, utilities, schools, etc.

Culture/Historic-Damage or loss of libraries, museums, landmarks, fairgournds, etc.

Environmental-Damage to or loss of forests, rangeland,
waterways, or other natural resources
Governance-Ability to maintain order and/or provide public amenities and services
Chart Title
6 5 4 3 2 1

7.1.b
Packet Pg. 393
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 134
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

9. It will help us to better mitigate your community against the effects of disaster if you tell us what type of assets are most important to you. Check the box for each asset about which you are concerned. 0 5
10 15
20 25
30 Chart Title
1 2 3 4 5 6 7 8 9 10 11 12 13

7.1.b
Packet Pg. 394
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 135
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

10. Other (please specify) option from Question 9
2% 6%
2%
5%
68%
2%
2%2%2%2%2%2%2%2%2%2%
0 Water Supply
Our Homes, Personal Property
Trees and Natural Resources
Diamond Bar
No, N/A, None
Hospitals
Figure out a way to stop taking money from
the middle class, so we can not become the
poor
Infrastructure-Road
I did not include "other" as an issue
Public Safety and Fire prevention should
always be #1
Electric Power Grid and water delivery

7.1.b
Packet Pg. 395
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 136
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

11. Mitigation activities included in the plan will reduce the community’s risk to hazards. Please tell us how important you think it is to consider each category as actions for your community to undertake or continue doing.
0 10
20 30
40 50
60 70
Chart Title
Very Important Somewhat Important Neutral Not Very Important Unimportant

7.1.b
Packet Pg. 396
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 137
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

12. Do you rent or own your home?
0 Rent Own No Yes

7.1.b
Packet Pg. 397
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 138
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

13. Please provide additional comments in the space provided.

13. Please provide additional comments in the space provided.

Happy to participate
How did you not include "homes" in question 8?
Thank you.

None
No option
n/a
None
None
N/A
N/A
this survey is not well written
No more
none

I HAVE NO ADDITIONAL COMMENTS
None
Lots of trees in Diamond Bar. Need to enforce a regular clearing of underbrush by residents.

NA
no commend
None
None
None
unclear question
n/a
none
thank you
Was this developed "in-house" or by a contractor to the city? Feel we need a better way of protection from “humans” who take advantage of a situation/disaster to loot, harm others and business during a disaster as well we’d as during a celebration timeIs: laker winning and so forth

7.1.b
Packet Pg. 398
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 139
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
N/A
thank you
none
None
N/A
None
I have no additional comments.

None
na
The city’s safety is and should be #1.

NA
Need to improve wildfire prevention due to overgrow brush maintenance NA
Looking forward to moving out of California before the next large Earthquake None
Climate change is an important factor in some of these natural disasters (e.g. droughts and storms).

More needs to be done, as this can be a preventative measure.

None
Next to sound planning and building, maintenance is the key to mitigating hazards. none
This survey is not well designed.

There are many hills in Diamond Bar that are prone to suffer landslide. I hope the city has plans to stabilize these hills before disaster hits. There are many homes on the bottom of these hills. n/a
Pleased to see this activity in progress!
N/A
NA
Nothing at this time
N/A
Na
None
None
None
NA
none
I general DB is a very safe community.
have a nice day
None

7.1.b
Packet Pg. 399
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 140
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
A disaster communication system that leverages technologies and methods not reliant on cell phone or an digital service. At combination of radio system and community volunteers to spread communication.

It is imperative that the City of Diamond Bar stop suing it’s residents for failing to mitigate or repair hillsides and slopes. In most cases the mitigation and repair requirements are beyond the affordability of most home owners in the area. These homes were built and sold in the 60’s and 70’s and mother nature is taking her toll on the surrounding landscape, which is not within the home owners control. Financial assistance and grants need to be made available to ALL residents regardless of their income. Landslide repair can cost in excess of $100K.

The city posted a draft copy of the Plan on its website for public review and comments.

7.1.b
Packet Pg. 400
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 141
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
APPENDIX E:

Hazard Scoring and Prioritization Methodology

HAZARD SCORING AND PRIORITIZATION
The HMC followed FEMA guidance for hazard mitigation plans and prioritized each of the 8 hazards. In the initial step, it assigned a score of 1 to 4 for each of the 10 hazards. The four criteria are provided in Table 10.

Table 10: Risk Character shows the Criterion Scoring used to assign a score for each criterion.

RISK CHARACTERISTIC (VULNERABILITY) SCORE
Area Impacted20312 No area in the jurisdiction directly impacted 0 Less than 25% of the jurisdiction impacted 1
(The percentage of the jurisdiction
at risk to an impact from each
hazard)
Less than 50% of the jurisdiction impacted 2
Less than 75% of the jurisdiction impacted 3
Over 75% of the jurisdiction impacted 4
Health and Safety
Consequences
No health and safety impact 0
Few injuries or illnesses 1
(The health and safety
consequences that can occur)
Few fatalities but many injuries or illnesses 3
Numerous Fatalities 4
S
No property damage 0
Few properties destroyed or damaged 1
(The amount of property damage
that can occur)
Few destroyed but many damaged 2
Few damaged and many destroyed 3
Many properties destroyed and damaged 4
Environmental Damage Little or no environmental damage 0 (The environmental damage that
can occur)
Resources damaged with short term recovery 1
Resources damaged with long term recovery 2
Resources destroyed beyond recovery 3
Economic Disruption No economic impact 0
Low direct and/or indirect costs 1
(The economic disruption that can
occur)
High direct and low indirect costs 2
Low direct and high indirect costs 3
High direct and high indirect costs 4

FUTURE OCCURRENCE SCORE
Probability of Future
Occurrence
(Susceptible) Unknown but anticipate rare occurrence 1
(Low) 1 – 4 documented occurrences over last 10 years 2 (The probability of a future
occurrence)
(Likely) 5 – 7 documented occurrences over last 10
years
3 (Highly Likely) 8 – 10 documented occurrences over
last 10 years 4
(Extremely Likely) More than 10 occurrences over last
10 years 5
After calculating the total impact score for each hazard (sum of the location, maximum probable extent, and the secondary impact). FEMA guidance recommends multiplying the total impact score by the overall

7.1.b
Packet Pg. 401
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 142
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
probability to determine the final score for each hazard. A final score between 0 and 12 is considered a low-threat hazard, 12.1 to 42 is a medium-threat hazard, and a score 42 and above is considered a highthreat hazard. This final score determines the prioritization of the hazards.

Table 11:

Risk Characteristics
(Vulnerability)

HAZARD TYPE
Area Impacted (Location)Health/SafetyProperty DamageEnvironmental DamageEconomic DamageRISK CHARACTERISTICS Total CHARACTERISTICS Total Score (number) Natural Hazards
Drought 3 1 0 2 3 9
Earthquake 4 3 4 2 4 17
Flood 3 1 2 2 2 10
Landslides 3 1 1 2 2 9
Severe Storm (Extreme Heat, Thunderstorm, Tornado and High Wind) 4 0 1 0 1 6 Wildfire 4 1 3 2 2 12
Technological/Human Caused Hazards
Hazardous Materials 4 1 0 2 2 9
Human Infectious Disease 4 3 0 0 3 10
Table 12 shows the vulnerability score, probability of future occurrence and total risk score. The total risk score is used to determine the risk level or priority ranking for each hazard of concern based on the criterion provided in Table 12:

Table 12:

Hazard
Vulnerability
Score (Sum of
Risk
Characteristic
Scores)
Probability
of Future
Occurrence
Score
Total
Risk
Score

RISK LEVEL
Drought 9 3 27 Moderate
Earthquake 17 2 34 High
Flood 10 1 10 Low
Landslides 9 1 9 Low
Severe Storm (Extreme Heat, Thunderstorm, Tornado
and High Wind)
6 5 30 Moderate
Wildfire 12 5 85 High

7.1.b
Packet Pg. 402
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 143
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
Hazardous Materials 9 2 18 Moderate
Human Infectious Disease 10 2 20 Moderate
Based on the Total Risk Score, each hazard is determined to be of Low, Moderate, or High concern to the City of Diamond Bar.

Table 13: RISK LEVEL TOTAL RISK SCORE
Low 0-15
A hazard with a LOW RISK rating is expected to have little to no impact upon the jurisdiction. The hazard poses minimal health and safety consequences to the state’s residents and is expected to cause little to no property damage. The occurrence of a hazard with a LOW RISK rating is rare; however, due to other factors such as geographic location it is still possible for such a hazard to occur and cause even significant damage based upon the magnitude of the event.

Moderate 16-30
A hazard with a MODERATE RISK rating is expected to have a moderate impact upon the jurisdiction. The hazard poses minor health and safety consequences with minor injuries expected and few to no fatalities.

The hazard may cause some property to be damaged or destroyed. The occurrence of a hazard with a MODERATE RISK rating is likely at least once within the next 25 years.

High 31 or More
A hazard with a HIGH-RISK rating is expected to have a significant impact upon the jurisdiction. The hazard poses high health and safety consequences with numerous injuries and fatalities possible. The hazard may cause even some property to be damaged or destroyed. A hazard with a HIGH-RISK rating is expected to occur at least once within a 12-month period but can occur multiple times within a year.

7.1.b
Packet Pg. 403
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 144
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
APPENDIX F: Funding Sources
Funfing Source
FEMA
Agency/Program Details Eligible Applicants/Notes Funding Availability Flood Mitigation
Assistance (FMA)
Program
Provides resources to assist
states, tribal governments,
territories, and local
communities in their efforts to
reduce or eliminate the risk of
repetitive flood damage to
buildings and structures
insurable under the National
Flood Insurance Program.

More Information available:
https://www.fema.gov/medialibrarydata/1499793315357c31fe f3839ece1533d9fccfe5caee71d/
FMA_FactSheet_FY2017_508.pdf
All 50 states, the District of
Columbia, federally
recognized Tribal
governments, American
Samoa, Guam, Northern
Marina Islands, Puerto Rico,
and the U.S. Virgin Islands.

Local Governments are
considered subapplicants and
must apply to their applicant
state/territory.

Applicants and Sub
applicants must have a
FEMA approved mitigation
plan as of the application
deadline in order to apply
for mitigation projects.

Nationally for FY 2017
$160,000,000: $70,000,000 has
been prioritize for community
flood mitigation proposals and
$90,000,000 available for FMA
if all funding is used.

Maximum federal share for
FMA planning sub-applications
is as follows: $100,000 for
community flood mitigation
advance assistance
$10,000,000 for community
flood mitigation project
$50,000 for technical
Assistance for states/territories
when $1,000,000 was awarded
in FY16, and $100,000 per
applicant for mitigation
planning with a maximum of
$50,000 for state plans and
$25,000 for local plans.

Hazard
Mitigation Grant
Program
(HGMP)
Provides grants to states and
local governments to implement
long-term hazard mitigation
measures after a major disaster
declaration.

More information available:
https://www.fema.gov/medialibrarydata/14411337242950933f 57e7ad4618d89debd1ddc6562d
3/FEMA_HMA_Grants_4pg_2015_
50 8.pdf
States, territories and
federally recognized tribal
governments are eligible.

Each state, territory, and
federally recognized tribal
government shall designate
one agency to serve as the
Applicant for each HMA
program.

Hazard Mitigation Grant
Program funding is available,
when authorized under a
Presidential major disaster
declaration, in the areas of
the State requested by the
Governor.

The amount of HMGP funding
available to the Applicant is
based upon the total Federal
assistance provided by FEMA
for disaster recovery under the
Presidential major disaster
declaration(s) and will vary
from year to year.

7.1.b
Packet Pg. 404
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 145
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
Building
Resilient
Infrastructure
and
Communities
(BRIC)
Provides funds for hazard
mitigation planning and the
implementation of mitigation
actions/ efforts to implement a
sustained pre-disaster natural
hazard mitigation program.
http://www.fema.gov/predisastermitigation-grantprogram Local governments are eligible
subapplicants and can sponsor
applications on behalf of
homeowners to submit to the
applicant)
All 50 states, the District of
Columbia, federally
recognized Tribal
Governments, American
Samoa, Guam, Northern
Mariana Islands, Puerto Rico,
the U.S Virgin Islands, and
universities are eligible to
apply.

Nationally, for FY 2017: PDM
Grant Program is $90,000,000.

All 50 states, the District of
Columbia, Federally
recognized Tribal
Governments, American
Samoa, Guam, Northern
Mariana Islands, Puerto Rico,
and the U.S Virgin Islands are
eligible to receive an allocation
of 1% of the appropriation or
$575,000; 105 of the
appropriated PDM funding, or
$10 million, will be set aside
for Federally recognized Tribal
applicants to receive an
allocation of $575,000 per
tribe. No applicant may receive
more than 15%, or $15 million
of the appropriated PDM
funding. Ten percent ($10
million) set aside for
recognized tribal areas-
$575,000 per tribe.

HUD
Agency/Program Details Eligible Applicants/Notes Funding Availability Community
Development Block
Grants (CDBG)
CDBG-Disaster Recovery Program
Neighborhood Stabilization Program
(NSP)
Grants to develop viable communities,
principally for low and moderateincome persons.
https://portal.hud.gov/hudportal/HUD
?src=
/program_offices/comm_planning/co
mmuni tydevelopment/programs
Funding to states, local
governments, tribal
governments
Total Disbursements up
to FY 2017:
$3,205,801,203,45

7.1.b
Packet Pg. 405
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 146
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
CDBG-Disaster
Recovery Program
CDBG funds available through the
Disaster Recovery Initiative made in
areas designated by the President of
the United States as disaster areas.

Communities must have significant
unmet recovery needs and the
capacity to carry out a disaster
recovery program (usually these are
governments that already receive
HOME or CDBG allocations).
https://www.hudexchange.info/progra
ms/c dbg-dr/
http://portal.hud.gov/hudportal/HUD?
src=/program_offices/comm_planning
/communitydevelopment/programs/d
rsi
Funding to states, local
governments, tribal
governments, and
Insular areas designated
by the President of the
United States as disaster
areas
Nationally, $70.7 billion
in Active Grants, as of
July 2017
Neighborhood
Stabilization Program
(NSP
Provides grants to address the
problems associated with homes that
have been foreclosed upon and are
creating economic problems for their
communities.
https://www.hudexchange.info/progra
ms/n sp/
Potential homebuyers, contractors,
and program partners aren’t able to
receive direct assistance from HUD.

Potential applicants need to contact
state, local government, or an NSP
non-profit grantee to find out how
the program operates in specific area.

For more information on
eligibility, see:
https://www.hudexchan
ge .info/grantees
National Disaster
Resilience
Competition
HUD award program that allowed 40
states and communities to request up
to $500 million for projects that
address unmet needs from past
disasters while addressing the
vulnerabilities that could put
Americans in harm’s way during future
disasters
https://www.hudexchange.info/progra
ms/c dbg-dr/resilient-recovery/ For
more information on eligibility, see:
$70 million dollars was
granted in Tuolumne
county for recovery
from the 2013 Rim Fire.

The $70 million will
create a partnership
between federal, state,
and local agencies to
create the Community
Watershed and
Resilience Program.

One time Competitive
grant awards totaling $1
billion in 2016.

7.1.b
Packet Pg. 406
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 147
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
http://hcd.ca.gov/nationaldisaster/doc
s/ndr c-release-final-1-22-16-3.pdf
EPA
Agency/Program Details Eligible Applicants/Notes Funding Availability Clean Water Act
Section 319
Grants
Supports a wide variety of activities including
technical assistance, financial assistance,
education, training, technology transfer,
demonstration projects and monitoring to assess
the success of specific nonpoint source
implementation projects.
http://water.epa.gov/polwaste/nps/cwact.cf m
Clean Water Act Section 319(h) funds are
provided only to designated state and tribal
agencies to implement their approved nonpoint
source management programs. State and tribal
nonpoint source programs include a variety of
components, including technical assistance,
financial assistance, education, training,
technology transfer, demonstration projects, and
regulatory programs. Each year, EPA awards
Section 319(h) funds to states in accordance with
a state-by-state allocation formula that EPA has
developed in consultation with the states. States
submit their proposed funding plans to EPA. If a
state’s funding plan is consistent with grant
eligibility requirements and procedures, EPA
then awards the funds to the state.
(https://www.epa.gov/nps/319-grantcurrentguidance)
States, territories,
and tribal
governments
Funds are
provided only to
designated state
and tribal
agencies to
implement their
approved
nonpoint source
management
programs.

EPA awards funds
to states in
accordance with
a stateby-state
allocation
formula that EPA
has developed in
consultation with
the states.

Nationally for FY 2017:
$167.9 million
source:
https://www.epa.gov/n
ps/319-grantprogramstates-andterritories
Clean Water
State Revolving
Funds
Supports
Established as a financial assistance program for
a wide range of water infrastructure projects.

States have the flexibility to fund a range of
projects that address their highest priority water
quality needs. The program provides loans to
construct municipal wastewater facilities, control
nonpoint sources or pollution, build
decentralized wastewater treatments systems,
create green infrastructure projects, protect
estuaries, and fund other water quality projects.

States and Puerto
Rico Project
eligibility
includes:
-construction of
publicly owned
treatment works
- nonpoint
source
Building on a federal
investment of $42
billion, the state
CWSRFs have provided
mora than $126 billion
to communities
through 2017. States
have provided more
than 38,440 lowinterest loans.

7.1.b
Packet Pg. 407
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 148
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
More information available:
https://www.epa.gov/cwsrf/learn-aboutcleanwater-state-revolving-fund-cwsrf - national estuary
program projects
- decentralized
wastewater
treatment
systems
- storm water
-water
conservation,
efficiency, and
reuse
-watershed pilot
projects
-energy
efficiency
-water reuse
Security
measures at
publicly owned
treatment works
-technical
assistance
Wetland
Program
Development
Grants
Provides applicants an opportunity to conduct
projects that promote the coordination and
acceleration of research, investigations,
experiments, training, demonstrations, surveys
and studies relations to the causes, effects,
extent, prevention, reduction and elimination of
water pollution
http://water.epa.gov/grants_funding/wetla
nds/grantguidelines/index.cfm
https://www.epa.gov/sites/production/files
/201705/documents/wetland_dev._grants_fact_s
heet.pdf
States, territories,
universities, tribal
governments,
national nonprofits, NGOs
may apply for
projects with the
U.S.

Expects a total
allocation of
approximately
$3,000,000 every two
years. With individuals
awards between
$50,000 and $500,000.

Funding is only
available every other
year

BUREAU OF LAND MANAGEMENT (BLM)
Wildland Urban Interface
Community Fire Assistance
The grants provide support to planning and implementation of hazardous fuels reduction projects in Wildland Urban Interface areas, education and outreach programs that help create fire adapted communities and resilient landscapes. The grant is open to any type of entity. Program mitigation/prevention experts address reduction of wildland fire threats and losses to communities and natural resources by taking actions before a fire starts. These teams work with local residents to help reduce the number of human-caused fires and implement wildland fire prevention programs. Additionally, the Community Assistance and Protection Program

7.1.b
Packet Pg. 408
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 149
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
facilitates additionally programs such as FIREWISE and Wildland Fire Education Public Service Announcements.

USDA
Details
Eligible
Details Eligible Details Eligible Details Eligible
USDA/SmithLever Special
Needs
Funding
Helps enable families, communities, and businesses to
successfully prepare for, respond to and cope with
disaster losses and critical incidents. This National
Institute of Food and Agriculture Program (NIFA) fund
Special Needs projects to implement applied scientific
programs that serve public needs in preparation for,
during, and after local or regional emergency situations. https://nifa.usda.gov/fundingopportunity/smith-leverspecial-needscompetitive-grants-program States, American
Samoa, Guam,
Micronesia, Northern
Marianas, Puerto Rico,
and the U.S. Virgin
Islands
Range of awards
are between
$15,000$150,000
. 2016 Program
Funding:

Estimated
$462,000
USDA/
Community
Facilities
Direct and
Guaranteed
Loans
Program
This program funds the development of essential
community facilities in rural areas. An essential
community facility is defined as a facility that provides an essential service to the local community for the orderly development of the community in a primarily rural area, and does not include private, commercial, or business
undertakings.
https://www.rd.usda.gov/programsservices/communityfacilities-direct-loangrant-program Localities (less than
20,000), special
purpose districts,
tribal governments,
and communitybased nonprofit
corporations
Public bodies,
Community based
non-profit
corporations,
Federally recognized
Tribes carrying out
activities in rural areas
including cities,
villages, townships
and towns including
Federally Recognized
Tribal Lands with no
more than 20,000
residents.

Combination of
a grant and loan
programs are
available. See
website for
grant and loan
conditions
USDA/Farm
Service
Agency
Disaster
Assistance for natural disaster losses, resulting from
drought, flood, fire, freeze, tornadoes, pest infestation, and other calamities.

Farmers, ranchers,
and agricultural
producers.

Each year, the U.S
Congress

7.1.b
Packet Pg. 409
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 150
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
Assistance
Programs
Various programs including an Emergency Loan Program,
Disaster Set-Aside Program, and Live Stock Forage
Program. To be eligible for disaster assistance programs under the 2014 Farm Bill, producers are no longer
required to purchase crop insurance or NAP coverage
http://www.fsa.usda.gov/FSA/webapp?area
=home&subject=diap&topic=landing
appropriates funds for
FSA farm loans as part
of the USDA budget.

The funds generally
are appropriate for
the government’s
fiscal year.

More information
available:
https://www.fsa.usda.
go v/Assets/USDAFSAPublic/usdafiles/F
actShe
ets/2016/farm_loan_p
ro
gram_funding_nov201

6. pdf
USDA Forest
Service/
Community
Wildfire
Protection
Plan (CWPP)
Provides communities with an opportunity to influence
where and how federal agencies implement fuel
reduction projects on federal lands and how additional
federal funds may be distributed for projects on
nonfederal lands.

A CWPP must be collaboratively developed by local and
state government representatives, in consultation with
federal agencies and other interested parties.

Creation of a CWPP can specifically address a
community’s unique conditions, values, and priorities
related to wildfire risk reduction and resilience.

Communities with CWPPs in place are given priority for
funding of hazardous fuels reduction projects carried out under the Healthy Forests Restoration Act (HFRA).
http://www.forestsandrangelands.gov/com
munities/cwpp.shtml
Communities who
want to prepare a
Wildfire Protection
Plan (CWPP)
A Handbook with
guidance on
assembling a CWPP
can be found here:
https://www.forestsan
dra
ngelands.gov/commu
nities
/documents/cwpphan
dbo ok.pdf
Firewise
Communities
Program
The National Fire Protection Association (NFPA) Firewise Communities Program encourages local solutions for
safety by involving homeowners in taking individual
responsibility for preparing their homes from the risk of wildfire. This program is facilitated by the USDA Forest Service, the US Department of the Interior and the
National Association of State Foresters.
https://www.nfpa.org/PublicEducation/Bytopic/Wildfire/Firewise-USA Check website for
procedures and
funding availability

7.1.b
Packet Pg. 410
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 151
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
USDA Forest
Service/
Wildland Fire
Management
(WFM)
The WFM program works to integrate fire as a critical
natural process in land and resource management plans
and activities, managing wildfire across landownership
boundaries, and applying the best available science.

Updated in 2010 under the American Recovery and
Investment Act of 2009, WFM supports job creation and
programs that lead to the protection of communities for large-scale unnaturally severe fires and contribute to the restoration of fire adapted ecosystems.

Assistance is intended to reduce forest susceptibility to wildfire, remove excess vegetative debris, and mitigate falling-tree hazards; improve vigor of live forest trees, and reforest areas damaged by wildfire and recent forest insect tree mortality.
http://www.fs.usda.gov/Internet/FSE_DOCU
MENTS/stelprdb5176385.pdf
Federal lands and in
cooperation with
states, local
governments, tribes,
and owners of private
lands.

Non- profit
organizations,
independent school
districts, individuals,
tribal governments,
tribal organizations,
private institutions of
higher education,
public and statecontrolled institutions
of higher education,
public housing
authorities, small
businesses, special
district governments,
state governments.

Nationally,
$3,000,000 as of
July 2018.

USDA
Natural
Resources
Conservation
Service/
Emergency
Watershed
Protection
Support
Services
Funds for implementing emergency measures to
safeguard lives and property from floods, drought, and
the products of erosion on any watershed whenever fire, flood, or any other natural occurrence is causing or has caused a sudden impairment of the watershed.

The program is designed to help people and conserve
natural resources by relieving imminent hazards to life and property caused by floods, fires, windstorms, and
other natural occurrences. EWP is an emergency recovery program. All projects undertaken, with the exception of the purchase of floodplain easements, must have a
project sponsor.
https://www.nrcs.usda.gov/wps/portal/nrcs
/main/national/programs/landscape/ewpp/
Public and private
landowners are
eligible for assistance
but must be
represented by a
project sponsor.

Sponsors can include
legal subdivisions of
the State, such as a
city, county, general
improvement district,
conservation district,
or any tribe or tribal
organization.

March 2018,
NRCS invested
$103 million in
EWP Program
funds
USDA
Natural
Resources
Conservation
Service/
Provides funds to prevent erosion, floodwater and
sediment damage, to further the conservation
development, use and disposal of water, and to further
the conservation and proper use of land in authorized
watersheds. https://www.nrcs.usda.gov/wps/portal/nrcs
States, local
governments and
Tribes (project
sponsors)

7.1.b
Packet Pg. 411
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 152
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
Watershed
and Flood
Prevention
Operations
(WFPO)
Program
/detail/national/programs/landscape/wfpo/?
cid=nrcs143_008271
State Programs
Proposition 1E: Disaster
Preparedness and Flood
Prevention Bond Act of 2006
In addition to the general fund, bonds are an important source of state funding for flood hazard mitigation projects. Among the largest is the voter‐approved $4.09 billion Proposition 1E (the Disaster Preparedness and Flood Prevention Bond Act of 2006) to fund flood management projects, including repairs and improvements to levees, weirs, bypasses, and other flood control facilities throughout the state. Proposition 1E allocates $3 billion to repair and improve state-federal facilities that are part of the State Plan of Flood Control for the Central Valley and to reduce the risks of levee failure in the Sacramento‐San Joaquin Delta.

Of these funds, a minimum of $1 billion will be allocated to high‐level flood protection for urban areas protected by state‐federal project levees, $300 million to design flood level protection for non‐urban areas protected by statefederal project levees, and a minimum of $500 million to reduce the risks of levee failure in the Sacramento‐San Joaquin Delta.

Also allocated are $500 million for State Flood Control Subventions and $300 million in storm water Flood Management Grants. Annex Table 2.N summarizes the purpose of allocated Proposition 1E dollars and funding levels.

Annex
Proposition 1: The Water
Quality, Supply, and
Infrastructure Improvement Act
of 2014
In 2014, California voters approved the Water Quality, Supply, and Infrastructure Improvement Act of 2014 (Proposition 1) authorizes $7.545 billion in general obligation bonds to fund ecosystems and watershed protection and restoration, water supply infrastructure projects, including surface and groundwater storage, and drinking water protection. Table 2.O illustrates funding status of Proposition 1 programs.

Many of the projects funded through Prop 1 further implement the California Water Action Plan, which, outlines the
State’sroadmaptowardsustainablewater management since2014.

Thisfunding has gonetoprojectsforwatershed restoration throughout the State. Specific examples include the American River Headwaters Restoration Project ($1.8 million), Napa River Restoration Oakville to Oak Knoll Project ($800,000) and appropriations to regional water agencies and conservancies, such as the Department of Water Resources and the San Diego River Conservancy. More information on Prop 1. Programs can be found at:

7.1.b
Packet Pg. 412
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 153
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
http://bondaccountability.resources.ca.gov/P1ProgramList.aspx .

Programs can be found at:
http://bondaccountability.resources.ca.gov/P1ProgramList.aspx Proposition 84 The voter‐approved $5.4 billion Proposition 84 (the Safe Water Quality, Supply, Flood Control, River and Coastal Protection Act of 2006) will allocate about $1.2 billion in additional funding beyond Proposition 1E for flood control projects including the Delta Levee Program, State Flood Control Subventions Program, and floodplain evaluation and delineations (see Annex Table 2.P). Local agencies have already proposed mitigation and levee strengthening projects in the amount of $204 million related to funds from Propositions 1E and 84.

Proposition 40 For information on Proposition 40 (California Clean Water, Clean Air, Safe Neighborhood Parks, and Coastal Protection Act of 2002) see the 2013 State Hazard Mitigation Plan.

Proposition 50 For information on Proposition 50 (Water Security, Clean Drinking Water, Coastal and Beach Protection Act of 2002, see the 2013 State Hazard Mitigation Plan.

7.1.b
Packet Pg. 413
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 154
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
APPENDIX G: Planning Maintenance Worksheets
Planning Maintence Worksheets
ATTACHMENT A: PLAN EVALUATION CHECKLIST

GOAL/OBJECTIVE
Address Current
Needs?
Yes No
Goal 1: Protect Life and Property
Objective 1.1: Implement activities that assist in protecting lives by making homes, businesses, infrastructure, critical facilities, and other property more resistant to losses from natural hazards.

Objective 1.2: Reduce losses and repetitive damages for chronic hazard events while promoting insurance coverage for catastrophic hazards.

Objective 1.3: Improve hazard assessment information to make recommendations for discouraging new development in high hazard areas and encouraging preventative measures for existing development in areas vulnerable to natural hazards.

Goal 2: Public Awareness
Objective 2.1: Develop and implement education and outreach programs to increase public awareness of the risk associated with natural hazards.

Objective 2.2: Provide information on education tools, partnership opportunities, and funding resources to assist in implementing mitigation activities.

Goal 3: Natural Systems
Objective 3.1: Balance natural resource management, and land use planning with natural hazard mitigation to protect life, property, and the environment.

Objective 3.2: Preserve, rehabilitate, and enhance natural systems to serve natural hazard mitigation functions
Goal 4: Partnership and Implementation
Objective 4.1: Strengthen communication and coordinate participation among and within public agencies, citizens, non-profit organizations, business, and industry to gain a vested interest in implementation.

Objective 4.2: Encourage leadership within public and private sector organizations to prioritize and implement local and regional hazard mitigation activities.

Goal 5: Emergency Services
Objective 5.1: Establish policy to ensure mitigation projects for critical facilities, services, and infrastructure.

7.1.b
Packet Pg. 414
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 155
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022
ATTACHMENT A: PLAN EVALUATION CHECKLIST
Objective 5.2: Strengthen emergency operations by increasing collaboration and coordination among public agencies, non-profit organizations, business, and industry.

Objective 5.3: Coordinate and integrate natural hazards mitigation activities, where appropriate, with emergency operations plans and procedures.

7.1.b
Packet Pg. 415
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 156
Section 7- Plan Maintenance
City of Diamond Bar Local Hazard Mitigation Plan-2022

ATTACHMENT B: PLANNING CONSIDERATIONS WORKSHEET

PLANNING CONSIDERATIONS
Address Current
Needs?
Yes No
Have the nature or magnitude of the risks identified in the plan changed? If yes, comment below.

Are the resources adequate for implementing the plan? If no, comment below.

Have there been any implementation problems such as technical, political, legal or coordination issues with other agencies for the mitigation actions identified? If yes, reference action by selecting “Delayed” on the Project Implementation Worksheet with a comment describing issue in implementation.

Have there been any personnel/agency changes be made to the City? If yes, provide the name(s) and contact information below.

Have there been changes to the participating community’s capabilities that improve or impair the progress of the mitigation strategies identified in the plan? If yes, please comment below.

7.1.b
Packet Pg. 416
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 157

ATTACHMENT C: MITIGATION ACTION IMPLEMENTATION WORKSHEET ACTION (# and Title)
Project Status Funding
*Comments (Insert comments to
support delayed or no longer
required.)

7.1.b
Packet Pg. 417
2022 City of Diamond Bar Local Hazard Mitigation Plan Section 7- PLAN MAINTENANCE 158
ATTACHMENT D: City of Diamond Bar HMC Meetings and Public Involvement Activities Log Date Event/Activity Sponsoring Agency or
Individual
Type* Purpose Result/Outcome

7.1.b
Packet Pg. 418
U.S. Department of Homeland Security
FEMA Region 9
1111 Broadway, Suite 1200
Oakland, CA 94607-4052
www.fema.gov
April 5, 2022
Anthony Santos
Assistant to City Manager
City Manager’s Office
City of Diamond Bar
21810 Copley Drive
Diamond Bar, CA 91765
Dear Mr. Santos:

FEMA has completed its review of the City of Diamond Bar Local Hazard Mitigation Plan 2022 and has determined that this plan is eligible for final approval pending its adoption by the City of Diamond Bar.

Formal adoption documentation must be submitted to FEMA Region 9 within one calendar year of the date of this letter, or the entire plan must be updated and resubmitted for review. FEMA will approve the plan upon receipt of the documentation of formal adoption.

If you have any questions regarding the planning or review processes, please contact the FEMA Region 9 Hazard Mitigation Planning Team at [email protected].

Sincerely,
Alison Kearns
Risk Analysis Branch Chief
Mitigation Division
FEMA Region 9
Enclosure (1)
City of Diamond Bar Plan Review Tool, dated April 5, 2022 cc: Victoria LaMar-Haas, Hazard Mitigation Planning Chief, California Governor’s Office of Emergency Services
Jennifer Hogan, State Hazard Mitigation Officer, California Governor’s Office of Emergency Services

7.1.c
Packet Pg. 419
FEMA Region IX Local Hazard Mitigation Plan Review Tool 1 APPENDIX B:

FEMA

LOCAL HAZARD MITIGATION PLAN REVIEW TOOL

REGION IX LOCAL HAZARD MITIGATION PLAN REVIEW TOOL
Updated 12/4/2019
The Local Hazard Mitigation Plan Review Tool demonstrates how the Local Hazard Mitigation Plan meets the regulation in 44 CFR §201.6 and offers State and FEMA Mitigation Planners an opportunity to provide feedback to the community.
• The Regulation Checklist provides a summary of FEMA’s evaluation of whether the plan has addressed all requirements.
• The Plan Assessment identifies the plan’s strengths as well as documents areas for future improvement. This section also includes a list of resources for implementation of the plan. • The Multi-Jurisdiction Summary Sheet is a mandatory worksheet for multi-jurisdictional plans that is used to document which jurisdictions are eligible to adopt the plan. • The Hazard Identification and Risk Assessment Matrix is a tool for plan reviewers to identify if all components of Element B are met.

Jurisdiction:

City of Diamond Bar
Title of Plan:

City of Diamond Bar Local Hazard
Mitigation Plan
Date of Plan:

January 2022
Local Point of Contact:

Anthony Santos
Address:

City of Diamond Bar
21810 Copley Drive
Diamond Bar, California 91765
Title:

Assistant to City Manager
Agency:

City Manager’s Office
Phone Number:
(909) 839-7013
E-Mail:

[email protected]
State Reviewer:

Osita Kamalu
Title:

Program Specialist
Date: 02/11/2022
Date Received at State Agency 01/25/2022
Date Sent to FEMA
FEMA Reviewer:

Philip Gilbertson
Title:

Community Planner
Date:
02/16/2022
Date Received in FEMA Region IX 2/11/2022
Date Not Approved 2/25/2022
Date Approvable Pending Adoption 4/5/2022
Date Approved

7.1.d
Packet Pg. 420
2 FEMA Region IX Local Mitigation Plan Review Tool
SECTION 1:

REGULATION CHECKLIST
INSTRUCTIONS: The Regulation Checklist must be completed by FEMA. The purpose of the Checklist is to identify the location of relevant or applicable content in the plan by element/subelement and to determine if each requirement has been ‘Met’ or ‘Not Met.’ The ‘Required Revisions’ summary at the bottom of each element must be completed by FEMA to provide a clear explanation of the revisions that are required for plan approval. Required revisions must be explained for each plan sub-element that is ‘Not Met.’ Sub-elements should be referenced in each summary by using the appropriate numbers (A1, B3, etc.), where applicable.

Requirements for each Element and sub-element are described in detail in the Local Plan Review Guide in Section 4, Regulation Checklist.

1. REGULATION CHECKLIST
Regulation (44 CFR 201.6 Local Mitigation
Plans)
Location in Plan
(section and/or
page number)
Met Not
Met
ELEMENT A. PLANNING PROCESS
A1. Does the plan
document the planning
process, including how
it was prepared and
who was involved in
the process for each
jurisdiction?
(Requirement
§201.6(c)(1))
a. Does the plan
provide
documentation of
how the plan was
prepared? This
documentation must
include the schedule
or timeframe and
activities that made
up the plan’s
development as well
as who was involved.

Section 3, Pages 15-23
Section 3. Pages 16-17
Appendix C
Pages 118-122
X
b. Does the plan list
the jurisdiction(s)
participating in the
plan that are seeking
approval?
NA
Page i-ii
X
c. Does the plan
identify who
represented each
jurisdiction?
(At a minimum, it
must identify the
jurisdiction
represented and the
person’s position or
title and agency
within the
jurisdiction.)
NA

Page 17 ends

X

7.1.d
Packet Pg. 421
FEMA Region IX Local Hazard Mitigation Plan Review Tool 3

1. REGULATION CHECKLIST
Regulation (44 CFR 201.6 Local Mitigation
Plans)
Location in Plan
(section and/or
page number)
Met Not
Met
A2. Does the plan
document an
opportunity for
neighboring
communities, local and
regional agencies
involved in hazard
mitigation activities,
agencies that have the
authority to regulate
development as well as
other interests to be
involved in the planning
process? (Requirement
§201.6(b)(2))
a. Does the plan
document an
opportunity for
neighboring
communities, local,
and regional agencies
involved in hazard
mitigation activities,
agencies that have
the authority to
regulate
development, as well
as other interested
parties to be involved
in the planning
process?
Section 3, Pages 19-20
X
b. Does the plan
identify how the
stakeholders were
invited to participate
in the process?
Section 3, Pages 16-17
X
A3. Does the plan
document how the
public was involved in
the planning process
during the drafting
stage? (Requirement
§201.6(b)(1))
a. Does the plan
document how the
public was given the
opportunity to be
involved in the
planning process?
Section 3, Pages 19-20
Appendix D. – Public Engagement
X
b. Does the plan
document how the
public’s feedback was
incorporated into the
plan?
Section 3, Pages 19-20
Appendix D. – Public Engagement
X
A4. Does the plan describe the review and
incorporation of existing plans, studies, reports,
and technical information? (Requirement
§201.6(b)(3))
Section 3, Pages 21,
Section 7, Page 122
X
A5. Is there discussion of how the
community(ies) will continue public
participation in the plan maintenance process?
(Requirement §201.6(c)(4)(iii))
Section 7, Pages 114-115
X
A6. Is there a
description of the
method and schedule
for keeping the plan
current (monitoring,
evaluating and
updating the mitigation
a. Does the plan
identify how, when,
and by whom the
plan will be
monitored (how will
implementation be
tracked) over time?
Section 7, Pages 110-115
Section 3, p.19, City Manager or representative
X

7.1.d
Packet Pg. 422
4 FEMA Region IX Local Mitigation Plan Review Tool

1. REGULATION CHECKLIST
Regulation (44 CFR 201.6 Local Mitigation
Plans)
Location in Plan
(section and/or
page number)
Met Not
Met
plan within a 5-year
cycle)? (Requirement
§201.6(c)(4)(i))
b. Does the plan
identify how, when,
and by whom the
plan will be
evaluated (assessing
the effectiveness of
the plan at achieving
stated purpose and
goals) over time?
Section 7, Pages 110-115
X
c. Does the plan
identify how, when,
and by whom the
plan will be updated
during the 5-year
cycle?
Section 7, Pages 110-115
X
ELEMENT A: REQUIRED REVISIONS
ELEMENT B. HAZARD IDENTIFICATION AND RISK ASSESSMENT
(Reviewer: See Section 4 for assistance with Element B) B1. Does the plan
include a description of
the type, location, and
extent of all-natural
hazards that can affect
each jurisdiction(s)?
(Requirement
§201.6(c)(2)(i))
a. Does the plan
include a general
description of allnatural hazards that
can affect each
jurisdiction?
Section 4, Pages 24-30
Section 4, p.25-28, Table 10 & 11
X
b. Does the plan
provide rationale for
the omission of any
natural hazards that
are commonly
recognized to affect
the jurisdiction(s) in
the planning area?
Section 4, Pages 24-30
Section 4, p.25-27, Table 10. Rationale for
including/excluding hazards clear from table
X
c. Does the plan
include a description
of the type of allnatural hazards that
can affect each
jurisdiction?
Section 4, Pages:
30-31
36-38
44-45
48 52-53
56 60-61
66 73-74
78-79
X

7.1.d
Packet Pg. 423
FEMA Region IX Local Hazard Mitigation Plan Review Tool 5

1. REGULATION CHECKLIST
Regulation (44 CFR 201.6 Local Mitigation
Plans)
Location in Plan
(section and/or
page number)
Met Not
Met
d. Does the plan
include a description
of the location for
all-natural hazards
that can affect each
jurisdiction?
Section 4, Pages
31-32
38-41
45 48
53-54
56-58
61-62
66-76
74-75
79-81
X
e. Does the plan
include a description
of the extent for allnatural hazards that
can affect each
jurisdiction?
Section 4, Pages
31-32
38-41
45 48
53-54
56-58
61-62
66-76
74-75
79-81
X
B2. Does the plan
include information on
previous occurrences of
hazard events and on
the probability of
future hazard events
for each jurisdiction?
(Requirement
§201.6(c)(2)(i))
a. Does the plan
include information
on previous
occurrences of
hazard events for
each jurisdiction?
Section 4, Pages
32-33
41-42
45-46
51 54
58-59
62-63
70-71
75-76
X
b. Does the plan
include information
on the probability of
future hazard events
for each jurisdiction?
Section 4, Pages
29 34
46 51
54 59
63 71
76 81
X

7.1.d
Packet Pg. 424
6 FEMA Region IX Local Mitigation Plan Review Tool

1. REGULATION CHECKLIST
Regulation (44 CFR 201.6 Local Mitigation
Plans)
Location in Plan
(section and/or
page number)
Met Not
Met
B3. Is there a
description of each
identified hazard’s
impact on the
community as well as
an overall summary of
the community’s
vulnerability for each
jurisdiction?
(Requirement
§201.6(c)(2)(ii))
a. Is there a
description of each
hazard’s impacts on
each jurisdiction
(what happens to
structures,
infrastructure,
people, environment,
etc.)?
Section 4, Pages
34-36
42-44
48-50
53-54
61-63
69-71
74-76
79-81
81-84
X
b. Is there a
description of each
identified hazard’s
overall vulnerability
(structures, systems,
populations, or other
community assets
defined by the
community that are
identified as being
susceptible to
damage and loss
from hazard events)
for each jurisdiction?
Section 4, Pages
29 34-36
46-47
51-52
54-56
59-60
63-66
71-73
76-77
81-83
X
B4. Does the plan address NFIP insured
structures within the jurisdiction that have been
repetitively damaged by floods? (Requirement
§201.6(c)(2)(ii))
Section 4, Pages 48
Section 5
Pages 91-92 X
ELEMENT B: REQUIRED REVISIONS
ELEMENT C. MITIGATION STRATEGY
C1. Does the plan
document each
jurisdiction’s existing
authorities, policies,
programs and
resources and its ability
to expand on and
a. Does the plan
document each
jurisdiction’s existing
authorities, policies,
programs and
resources?
Section 5, Pages 85-92
Planning Admin Financial Outreach

X X X X

5.0 Page.85

5.0 Pages.88-
90 6.0
Pages.91

6.0 Pages
93-94
X

7.1.d
Packet Pg. 425
FEMA Region IX Local Hazard Mitigation Plan Review Tool 7

1. REGULATION CHECKLIST
Regulation (44 CFR 201.6 Local Mitigation
Plans)
Location in Plan
(section and/or
page number)
Met Not
Met
improve these existing
policies and programs?
(Requirement
§201.6(c)(3))
b. Does the plan
document each
jurisdiction’s ability
to expand on and
improve these
existing policies and
programs?
Section 5, Pages 85-92
Planning Admin Financial Outreach

X X X X

6.0 Page.97

6.0 Page.97

6.0 Page. 97

6.0

Page 97 ends

X
C2. Does the plan address each jurisdiction’s
participation in the NFIP and continued
compliance with NFIP requirements, as
appropriate? (Requirement §201.6(c)(3)(ii))
Section 5, Pages 91-92
X
C3. Does the plan include goals to reduce/avoid
long-term vulnerabilities to the identified
hazards? (Requirement §201.6(c)(3)(i))
Section 6, Pages93-95
X
C4. Does the plan
identify and analyze a
comprehensive range
of specific mitigation
actions and projects for
each jurisdiction being
considered to reduce
the effects of hazards,
with emphasis on new
and existing buildings
and infrastructure?
(Requirement
§201.6(c)(3)(ii))
a. Does the plan
identify and analyze a
comprehensive range
of specific mitigation
actions and projects
to reduce the
impacts from
hazards?
Section 6, Pages 96-97
X
b. Does the plan
identify mitigation
actions for every
hazard posing a
threat to each
participating
jurisdiction?
Section 6, Pages 99-109
X
c. Do the identified
mitigation actions
and projects have an
emphasis on new and
existing buildings and
infrastructure?
Section 6, Pages 99-110
X
C5. Does the plan
contain an action plan
that describes how the
actions identified will
be prioritized (including
cost benefit review),
a. Does the plan
explain how the
mitigation actions
will be prioritized
(including cost
benefit review)?
Section 6, Pages 99-110
X

7.1.d
Packet Pg. 426
8 FEMA Region IX Local Mitigation Plan Review Tool

1. REGULATION CHECKLIST
Regulation (44 CFR 201.6 Local Mitigation
Plans)
Location in Plan
(section and/or
page number)
Met Not
Met
implemented, and
administered by each
jurisdiction?
(Requirement
§201.6(c)(3)(iv));
(Requirement
§201.6(c)(3)(iii))
b. Does the plan
identify the position,
office, department,
or agency responsible
for implementing and
administering the
action, potential
funding sources and
expected timeframes
for completion?
Section 6, Pages 99-110
X
C6. Does the plan
describe a process by
which local
governments will
integrate the
requirements of the
mitigation plan into
other planning
mechanisms, such as
comprehensive or
capital improvement
plans, when
appropriate?
(Requirement
§201.6(c)(4)(ii))
a. Does the plan
identify the local
planning mechanisms
where hazard
mitigation
information and/or
actions may be
incorporated?
Section 6, Page 97
Section 3, p.21
X
b. Does the plan
describe each
community’s process
to integrate the data,
information, and
hazard mitigation
goals and actions into
other planning
mechanisms?
Section 6, Page 97
Section 6. Pages 97
X
c. The updated plan
must explain how the
jurisdiction(s)
incorporated the
mitigation plan,
when appropriate,
into other planning
mechanisms as a
demonstration of
progress in local
hazard mitigation
efforts.

Section 6, 97-110
X
ELEMENT C: REQUIRED REVISIONS
ELEMENT D. PLAN REVIEW, EVALUATION, AND IMPLEMENTATION
(Applicable to plan updates only)
D1. Was the plan revised to reflect changes in
development? (Requirement §201.6(d)(3))
Section 2, Pages 12-14
Section 4, p.43, 63, 71, 75 X

7.1.d
Packet Pg. 427
FEMA Region IX Local Hazard Mitigation Plan Review Tool 9

1. REGULATION CHECKLIST
Regulation (44 CFR 201.6 Local Mitigation
Plans)
Location in Plan
(section and/or
page number)
Met Not
Met
D2. Was the plan revised to reflect progress in
local mitigation efforts? (Requirement
§201.6(d)(3))
Section 6, Pages 101-105
Section 3, p.27 X
D3. Was the plan revised to reflect changes in
priorities? (Requirement §201.6(d)(3))
Section 6, Pages 95-96
X
ELEMENT D: REQUIRED REVISIONS
ELEMENT E. PLAN ADOPTION
E1. Does the plan include documentation that
the plan has been formally adopted by the
governing body of the jurisdiction requesting
approval? (Requirement §201.6(c)(5))
(Pending Adoption)
X
E2. For multi-jurisdictional plans, has each
jurisdiction requesting approval of the plan
documented formal plan adoption?
(Requirement §201.6(c)(5))
N/A
ELEMENT E: REQUIRED REVISIONS
E1. Once granted APA status, the plan must be formally adopted by the local jurisdiction within 12-months.

Upon receipt of the formal adoption documentation, FEMA will approve the plan and the jurisdiction will be eligible for designated pre-disaster mitigation grant opportunities.

OPTIONAL: HIGH HAZARD POTENTIAL DAM RISKS (Applicable to jurisdictions interested in becoming sub applicants to FEMA’s Rehabilitation of High Hazard Potential Dams (HHPD) Grant Program only) HHPD1. Did Element A4 (planning process)
describe the incorporation of existing plans,
studies, reports, and technical information for
high hazard potential dams?
NA
HHPD2. Did Element B3 (risk assessment)
address HHPDs?
NA
HHPD3. Did Element C3 (mitigation goals)
include mitigation goals to reduce long-term
vulnerabilities from high hazard potential dams
that pose an unacceptable risk to the public?
NA
HHPD4. Did Element C4-C5 (mitigation actions)
address HHPDs prioritize mitigation actions to
reduce vulnerabilities from high hazard
potential dams that pose an unacceptable risk
to the public?
NA

REQUIRED REVISIONS
ELEMENT F. ADDITIONAL STATE REQUIREMENTS
(Optional for State Reviewers only; not to be completed by FEMA)

7.1.d
Packet Pg. 428
10 FEMA Region IX Local Mitigation Plan Review Tool

1. REGULATION CHECKLIST
Regulation (44 CFR 201.6 Local Mitigation
Plans)
Location in Plan
(section and/or
page number)
Met Not
Met
F1. NA
F2. NA
ELEMENT F: REQUIRED REVISIONS

7.1.d
Packet Pg. 429
FEMA Region IX Local Hazard Mitigation Plan Review Tool 11 SECTION 2:

PLAN ASSESSMENT
A. Plan Strengths and Opportunities for Improvement
This section provides a discussion of the strengths of the plan document and identifies areas where these could be improved beyond minimum requirements.

Element A: Planning Process
Opportunities for Improvement:
1) While there was a brief mention that neighboring jurisdictions were given the opportunity to participate (ref. p.20), it was unclear which jurisdictions were invited, when, how, and who their representative was. Given the overlapping location and extent of hazards, as well as the benefits of pursuing joint mitigation actions, we strongly encourage jurisdictions to strengthen partnerships with neighboring jurisdictions to advance mutually beneficial actions.
2) In future updates, consider expanding planning committee participants to include community planners, economic development, and elected officials. These officials often have direct involvement in areas which are key to integrating the LHMP with local decisionmaking processes. While not always possible, LHMPs and mitigation actions are strengthened when local elected officials are involved in the planning process.

Element B: Hazard Identification and Risk Assessment
Strengths:
1) Great use of the ‘community lifelines’ framework to discuss areas of vulnerability for each hazard.
2) Good use of HAZUS-MH to estimate potential losses from catastrophic earthquakes.

Consider incorporating a finer-scale analysis of building inventories (to include residential structures) to determine and map potential damages and mitigation actions based on building types. This in-turn aids the evaluation of possible emergency response needs and actions.

Opportunities for Improvement:
1) Consider exploring and including data sources that break-down hazards, impacts (including past losses), and risk at the local level. Consider the use of data at the county or census tract level (ref. Spatial Hazard Events and Losses Database – SHELDUS; FEMA’s National Risk Index) in future updates.
2) Consider a finer detail analysis of community exposure and vulnerability to each hazard.

For instance, in addition to mapping areas of wildfire risk and identifying the number/cost of buildings exposed, consider a table/matrix and map identifying the number of residents

7.1.d
Packet Pg. 430
12 FEMA Region IX Local Mitigation Plan Review Tool
exposed, number/location of vulnerable populations, type/location of fire-prone vegetation, building densities, etc. These quantitative measures, in conjunction with a qualitative assessment, would aid in the development and prioritization of mitigation actions.
3) Categories of severe weather that are distinct phenomena (e.g. extreme heat, freeze, or storms by type) always need to be profiled out separately if they are high priority or have a mitigation action identified
Element C: Mitigation Strategy
Strengths:
1) Clear understanding and consideration of the range of potential mitigation actions. 2) Good to see the use building codes updates as a key mitigation action across multiple hazards. Consider including land-use zoning changes and other planning-related activities as part of the mitigation strategy in future update. Many of these alternative planningrelated activities are also eligible for federal funding.

Opportunities for Improvement:
1) Connecting mitigation actions to the plan’s goals and objectives. Consider directly identifying the ways in which the individual mitigation actions further progress towards the plan’s goals and objectives. The use of pre-identified metrics would help track progress towards goal attainment and evaluate the effectiveness of mitigation actions. 2) It is strongly encouraged to use ‘problem statements’ in developing mitigation goals, objectives, actions, and/or strategies. Problem statements are succinct summaries of a community’s vulnerabilities to a given hazard and may include the known or suggested causes or contributing factors to vulnerability. These plain language problem statements can then be used to organize and craft plan goals and subsequent objectives, actions, or strategies (for reference, see California Adaptation Planning Guide, 2020, CalOES). 3) Many of the proposed actions aren’t directly related to risk reduction or hazard mitigation, but rather address emergency preparedness and response actions. Although a mitigation action for each high-priority hazard was provided, meeting review criteria, in future updates, please consider the range of actions that will reduce or avoid future losses for each the plan’s identified hazards.

7.1.d
Packet Pg. 431
FEMA Region IX Local Hazard Mitigation Plan Review Tool 13 Element D: Plan Update, Evaluation, and Implementation (Plan Updates Only) Strengths:
1) Excellent use of ‘Table 45: Method and Schedule for Maintaining and Updating Mitigation Plan’ to describe how Diamond Bar intends to maintain the plan and prepare for future updates ahead of the 5-year expiration point.

Opportunities for Improvement:
1) Recommend considering the sources of data available to assess hazards and mitigation actions throughout the 5-year period. Qualitative assessments are useful and can leverage the expertise and experience of city staff, but quantitative sources of data may help identify patterns and trends in hazards and vulnerabilities affecting the planning area. 2) Consider identifying a specific person/position responsible for monitoring plan and mitigation action outcomes. While the City Manager’s office is identified, it often advantageous to appoint a specific person/position to monitor the plan and integrate mitigation actions with existing city resources and planning mechanisms.

B. Resources for Implementing and Updating Your Approved Plan This resource section is organized into three categories:
1) Guidance and Resources
2) Training Topics and Courses
3) Funding Sources
Guidance and Resources
Local Mitigation Planning Handbook
https://www.fema.gov/media-library/assets/documents/31598 Beyond the Basics
http://mitigationguide.org/
Mitigation Ideas
https://www.fema.gov/media-library/assets/documents/30627 Plan Integration: Linking Local Planning Efforts
https://www.fema.gov/media-library/assets/documents/108893 Integrating Disaster Data into Hazard Mitigation Planning https://www.fema.gov/media-library/assets/documents/103486 Integrating Historic Property and Cultural Resource Considerations into Hazard Mitigation Planning
https://www.fema.gov/ar/media-library/assets/documents/4317 Community Rating System User Manual
https://www.fema.gov/media-library/assets/documents/8768

7.1.d
Packet Pg. 432
14 FEMA Region IX Local Mitigation Plan Review Tool
U.S. Climate Resilient Toolkit
https://toolkit.climate.gov/
2014 National Climate Assessment
http://nca2014.globalchange.gov/
Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation http://ipcc-wg2.gov/SREX/images/uploads/SREX-All_FINAL.pdf FY15 Hazard Mitigation Assistance Unified Guidance
https://www.fema.gov/media-library/assets/documents/103279 Climate Resilient Mitigation Activities for Hazard Mitigation Assistance https://www.fema.gov/media-library/assets/documents/110202 Training
More information at https://training.fema.gov/emi.aspx or through your State Training Officer Mitigation Planning
IS-318 Mitigation Planning for Local and Tribal Communities https://training.fema.gov/is/courseoverview.aspx?code=is-318 IS-393 Introduction to Hazard Mitigation
https://training.fema.gov/is/courseoverview.aspx?code=is-393.a G-318 Preparing and Reviewing Local Plans
G-393 Mitigation for Emergency Managers
Hazard Mitigation Assistance (HMA) Grant Programs
IS-212.b Introduction to Unified HMA
http://www.training.fema.gov/is/courseoverview.aspx?code=IS-212.b IS-277 Benefit Cost Analysis Entry Level
http://www.training.fema.gov/is/courseoverview.aspx?code=IS-277 E-212 HMA: Developing Quality Application Elements
E-213 HMA: Application Review and Evaluation
E-214 HMA: Project Implementation and Programmatic Closeout E-276 Benefit-Cost Analysis Entry Level
GIS and Hazus-MH
IS-922 Application of GIS for Emergency Management
http://www.training.fema.gov/is/courseoverview.aspx?code=IS-922 E-190 ArcGIS for Emergency Managers
E-296 Application of Hazus-MH for Risk Assessment
E-313 Basic Hazus-MH
Floodplain Management
E-273 Managing Floodplain Development through the NFIP
E-278 National Flood Insurance Program/ Community Rating System Potential Funding Sources
Hazard Mitigation Grant Program
POC: FEMA Region IX and State Hazard Mitigation Officer Website: https://www.fema.gov/hazard-mitigation-grant-program Pre-Disaster Mitigation Grant Program

7.1.d
Packet Pg. 433
FEMA Region IX Local Hazard Mitigation Plan Review Tool 15 POC: FEMA Region IX and State Hazard Mitigation Officer Website: https://www.fema.gov/pre-disaster-mitigation-grant-program Flood Mitigation Assistance Grant Program
POC: FEMA Region IX and State Hazard Mitigation Officer Website: https://www.fema.gov/flood-mitigation-assistance-grant-program Emergency Management Performance Grant Program
POC: FEMA Region IX
Website: https://www.fema.gov/emergency-management-performance-grant-program

7.1.d
Packet Pg. 434
16 FEMA RIX Local Mitigation Plan Review Tool
SECTION 3:

MULTI-JURISDICTIONAL SUMMARY SHEET
INSTRUCTIONS: For multi-jurisdictional plans, this summary sheet must be completed by listing each participating jurisdiction that is eligible to adopt the plan.

MULTI-JURISDICTION SUMMARY SHEET
# Jurisdiction Name Jurisdiction Type
Eligible to
Adopt the
Plan?
Plan POC Email
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 7.1.d
Packet Pg. 435
FEMA Region IX Local Mitigation Plan Review Tool 17
SECTION 4:

HAZARD IDENTIFICATION AND RISK ASSESSMENT MATRIX (OPTIONAL) INSTRUCTIONS: This matrix can be used by the plan reviewer to help identify if all of the components of Element B have been met.

List out natural hazard names that are identified in the plan in the column labeled “Hazards” and put a “Y” or “N” for each component of Element B.

7.1.d
Packet Pg. 436
FEMA Region IX Local Mitigation Plan Review Tool 18

HAZARD IDENTIFICATION AND RISK ASSESSMENT MATRIX
Hazard
Requirement Met? (Y/N)
Type Location Extent Previous
Occurrences Probability Impacts Vulnerability
Mitigation
Action
Drought
Moderate Section

4.Pages 28,
31-32
Section

4.Pages 31-32
Section

4.Pages 32-33
3 Section

4.Pages 34-
36 9 Section 6.0
Pages 104
Earthquake
High Section

4.Pages 28,
38-41
Section

4.Pages 38-41
Section

4.Pages 41-42
2; p.42 Section

4.Pages 42-
44 17; p.90 Section 6.0
Pages 104
Flood
Low Section

4.Pages 28,
45-47
Section

4.Pages 45-47
Section 4.Page
48 1 Section

4.Pages 48-
50 10 Section 6.0
Pages 105-
106
Landslides
Low Section

4.Pages 28,
50-52
Section

4.Pages 50-52
Section

4.Pages 52-53
1 Section

4.Pages 53-
54 9 Section 6.0
Pages 104-
109
Severe Storm
(Extreme Heat,
Thunderstorm,
Tornado and High
Wind)
Moderate
Heat: 51
Winds: 67-
68 Rain: 60
Section

4.Pages 28,
57-58
Heat: 52
Winds: 68
Rain: 60
Section

4.Pages 57-58
Heat: 52
Winds: 68
Rain: 61
Section

4.Pages 58-60
Heat: 53
Winds: 69
Rain: 61
5 Heat: 53
Winds: 70
Rain: 61
Section

4.Pages 61-
63 Heat: 53-
54 Winds: 71-
73 Rain: 61
6 Heat: 53-
54 Winds: 71-
73 Rain: 61-
63 Section 6.0
Pages 104
Heat: 106
Winds: 104,
106
Rain: 107
Wildfire
High Section

4.Pages 28,
64-68
Section

4.Pages 64-68
Section

4.Pages 68-69
5; p.69 Section

4.Pages 69-
71 12; p.92 Section 6.0
Pages 105-
106,107

7.1.d
Packet Pg. 437
19 FEMA RIX Local Mitigation Plan Review Tool

HAZARD IDENTIFICATION AND RISK ASSESSMENT MATRIX
Hazard
Requirement Met? (Y/N)
Type Location Extent Previous
Occurrences Probability Impacts Vulnerability
Mitigation
Action
Hazardous Materials
Moderate Section

4.Pages 28,
72-73
Section

4.Pages 72-73
Section

4.Pages 73-74
2 Section

4.Pages 74-
76 9 Section 6.0
Pages 105
Human Infectious
Disease
Moderate Section

4.Pages 28,
77-79
Section

4.Pages 77-79
No previous
Occurrence
2 Section

4.Pages 79-
81 8 Section 6.0
Pages 105
Notes:

Natural Hazard - * Hazard considered under CFR (Requirement §201.6(c)(2)(i)) Low-Mod Priority
Natural Hazard
Hazard(s) considered low-mod priority, but which have a mitigation action identified. Requires full profile for each hazard.

High Priority Natural
Hazard
Hazard(s) considered high priority and must have a mitigation action identified. Requires full hazard profile.

7.1.d
Packet Pg. 438

← All documents from this meeting