Cities Index.
Conceptual Site Plan

Diamond Bar City Council
October 3, 2023

Document
Conceptual Site Plan
Meeting
October 3, 2023
Body
Diamond Bar City Council
Original file
4.0 MB
Text extracted from the city's file for reading and search. Open the original on diamondbarca.iqm2.com. That file is the official record.

(E) = Existing
FEATURE LEGEND: X (P) = Proposec
(E) Property line wall to remain (P) Stucco
42 43 52
enhancement
(P) New LED parking light standard
(P) New parking lot curb
(P) New asphalt pavement
Brea Canyon Road (P) 30" W. x 18" D. x wall height cut stone pilaster w/ concrete cap
- Phase 1 • - Phase T (P) Existing tree to be removed
(P) 6" Curb @ Handicap access ramp
(E) Tree to remain - Protect in place
(P) New concrete paving

10. (P) New building improvements

11. (P) New LED walkway light standard

12. (P) New stairs w/ handrails

13. (P) Handicap ramp w/ handrails

14. Not Used

15. (P) 6" Thick concrete paving at basketball

16. Not Used
Phase 1

17. (P) Park bench standard

18. (P) 12" - 18" Thick wood fiber play mulch

19. (P) Steel arbor structure
Phase 3 20. (E) Baseball field to remain - Future phase HHH H

21. (P) Concrete picnic table

22. (P) Steel BBQ unit standard
(P) Trash receptacle standard
(P) 6" Concrete curb
Phase 3 25. (P) 2' Concrete banding
Final design to be 26. (P) Enhanced concrete paving
determined at a later 27. (P) 18" High split face seat wall w/ Existing concrete cap
date unity Cente Storage

28. (P) 30" sq. x 42" High cut stone pilaster w/
12)
concrete cap

29. (P) 42" High aluminum fence

30. (P) 12" Wide play area curb

31. (P) New restroom facility

32. (P) New play equipment 2-5 yr. and 5-12 yr.
(E) Landscape to remain - Protect in place
(E) Baseball backstop - Protect in place
(P) 3 Rail equestrian fence
(E) Chain link fence - Protect in place

37. Not Used

38. Not Used

39. (P) Drinking fountain

40. (E) Bleachers - Protect in place
(E) Concrete walk - Protect in place
Phase 3
(E) Concrete curb & gutter - Protect in
place
hase
(P) New LED parking lot light standard

44. (P) Slurry coat and parking lot striping

45. (P) Retaining wall - see civil plans

46. (P) Basketball standard
(P) Natural turf
(E) Retaining wall - Protect in place (P)
Reface with cut stone and concrete cap

49. (E) Driveway approach - Protect in place

50. (P) Retaining wall extension

51. (P) Entry monument sign

52. (P) Entry monument railing

53. (P) New ADA access with integrated ramp
01 5) 8 into sidewalk

54. (P) Infiltration swale - See civil plans
Heritage Park - Park Master Plan - Option 5
NORTH Incorporated
In tearated Consul ling Group
Diamond Bar, California
September 2019 Planning - Architecture • Landscape Architecture

← All documents from this meeting