Cities Index.
15. Adopt Reso Apprv List of Projects in Proposed FY 22-23 Capital Imp Prgm funded by SB1

Downey City Council
May 24, 2022

Document
15. Adopt Reso Apprv List of Projects in Proposed FY 22-23 Capital Imp Prgm funded by SB1
Meeting
May 24, 2022
Body
Downey City Council
Pages
5
Original file
4 KB
Text extracted from the city's file for reading and search. Open the original on lf.downeyca.org. That file is the official record.

_.q _ * i i •
I.

MOO 0 0 0
react qUICKIY to emergency MAE a a WIT 1110+ILU5 UT Uelay can DU Ye anu Mair WHEREAS, restoring roads before they fail also reduces construction time which results in less air pollution from heavy equipment and less water pollution from site run-off; and

Z 0 11 0
UACI=1016 19W
WHEREAS, the SB 1 project list, attached herein as Exhibit "A" and "B", and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting -edge technology, materials and practices, will have significant positive co -benefits statewide.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF DOWNEY DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. The City Council of the City of Downey is approving the list of newly proposed projects attached herein as Exhibit "A" to be funded in Fiscal Year 2022/2023 with SECTION 2. The City Council of the City of Downey is approving the list of projects previously proposed and adopted from Fiscal Year 2021/2022 attached herein as Exhibit "B" and may also utilize Fiscal Year 2022/2023 RMRA revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State our intent to fund these projects with RMRA revenues:

BLANCA PACHECO, Mayor

MARIA ALICIA DUARTE, CIVIC
City Clerk
I HEREBY CERTIFY that the foregoing Resolution was adopted by the City Council of the City of Downey at a regular meeting held on the 24 th day of May, 2022, by the following vote, to wit
AYES:

Council Members:

NOES:

Council Member:

ABSENT:

Council Member:

ABSTAIN:

Council Member:

MARIA ALICIA DUARTE, CMC
City Clerk

4NT��
Estimated Proposed
Project
Description
Location
Useful Life i Schedule of
-
- - -------
Co
qpTpIetion
Rehabilitation of existing
asphalt pavement, repair of

1. Woodruff Avenue
existing miscellaneous
Pavement
concrete surfaces,
Firestone Blvd,
20 years 6/2023
Rehabilitation
replacement of existing
to Foster Rd.
striping and pavement
markings and installation of
bike lanes.

Rehabilitation of existing
Foster Road to
asphalt pavement, repair of
Dalen Street and

2. Bellflower
existing miscellaneous
900 feet north of
Boulevard Pavement
concrete surfaces,
Imperial
20 years 6/2023
Rehabilitation
replacement of existing
Highway to
striping and pavement
Stewart and
markings.

Gray Road
Rehabilitation of existing
asphalt pavement, repair of

3. Downey Avenue
existing miscellaneous
Pavement
concrete surfaces,
5th St. to
20 years 12/2023
Rehabilitation
replacement of existing
Alameda t.
striping and pavement
markings and installation of
bike lanes (PS&E only).

4. Lakewood
Replacement of uplifted
Alameda St to
Boulevard Parkway
sidewalk panels and tree
Imperial Hwy.
50 years 12/2023
Improvements
removals as necessary.

Update Citywide Pavement

5. Pavement
Management Plan to
Citywide
3 years 6/2023
Management Plan
prioritize the City's street
paving needs.

M. MN MINOMMMM111 CIAO 11
Estimated
Proposed
Project
Description Location Useful Life
Schedule of
Completion
Construction of raised center

1. Telegraph Road
median islands, rehabilitation Telegraph Road
Traffic Throughput
of existing asphalt pavement, (West City Limit
& Safety
new construction and repair to Lakewood
Enhancements,
of miscellaneous concrete Boulevard and 20 Years
07/2022
Phase 2
surfaces, traffic signal Passons
upgrades and incidental Boulevard to
signage, striping and East City Limit)
pavement markings
Construction of new sidewalk Blodgett Ave.,
and curb ramps, signage, I Adoree St.,

2. South Downey
replacement of striping and Airpoint Ave., La
Safe Routes to
pavement markings, Reina Ave., 50 years
12/2022
School Project
installation of vehicle speed Nada St., Julius
feedback signs and safety St., Brunache
education program St. & Laura St.

← All documents from this meeting