Cities Index.
02. CIP 23-01 Accpt Work FY 22-23 Annual Misc Concrete Rep Dist 4, ADA & Misc Imprv, & Lakewood Blvd. Pkwy

Downey City Council
March 14, 2023

Document
02. CIP 23-01 Accpt Work FY 22-23 Annual Misc Concrete Rep Dist 4, ADA & Misc Imprv, & Lakewood Blvd. Pkwy
Meeting
March 14, 2023
Body
Downey City Council
Pages
6
Original file
3 KB
Text extracted from the city's file for reading and search. Open the original on lf.downeyca.org. That file is the official record.

IM1111 1AV.

TO* HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL APPROVED BY

CITY GER
FROM: OFFICE OF THE CITY MANAGER
BY: EDWIN J. NORRIS, P.E., INTERIM DIRECTOR OF PUBLIC WORKS/

CITY ENGINEER
SUBJECT: ACCEPT WORK FOR FISCAL YEAR (FY) 2022123 ANNUAL MISCELLANEOUS CONCRETE REPAIRS (COUNCIL DISTRICT 4), AMERICANS WITH DISABILITIES

ACT (ADA) AND MISCELLANEOUS IMPROVEMENTS (CITYWIDE), AND

LAKEWOOD BOULEVARD PARKWAY IMPROVEMENTS, CAPITAL IMPROVEMENT PROJECT (CIP) NO. 23-01
fi FM Taxems � I

1. Accept work for FY 2022/23 Annual Miscellaneous Concrete Repairs (Council District 4), American with Disabilities Act (ADA) and Miscellaneous Improvements (Citywide), and Lakewood Boulevard Parkway Improvements, CIP No. 23-01; 0111138
3, Authorize Interim Director of Public Works/City Engineer to file Notice of Completion with the Los Angeles County Recorder's office.
[i �-Iplxcl ael I 1611
TOM,TPM 71=f 3-72"'y f1,7rn—F-vh7wT, 111-1 T ur,.f 77717-4- FY 2022/23 Annual Miscellaneous Concrete Repairs (Council District 4), ADA and Miscellaneous Improvements (Citywide), and Lakewood Boulevard Parkway Improvements and granted authority to advertise for construction bids. A copy of specifications is available for review in the Public Works Department. On December 8, 2022, the City Council awarded a construction contract in the amount of $552,252.50 to Gentry General Engineering, Inc. On December 27, 2022, work commenced and was completed on February 21, 2023.

OIL
-0*1A&MtX*11N
RM F.09521IRTM
o riveway
a Nag
the overall work included the construction OT 21,UbU square te----eQl�iF 0 sidTewal approaches, 4,982 SF of curb access ramps, 1,315 feet of curb and gutter, 815 SF of cross gutter and spandrel and 1,603 SF of asphalt pavement.

DISTRICT 4), D. AND MISCELLANEOUS IMPROVEMENTS (CITYWIDE),

AND LAKEWOOD BOULEVARD PARKWAY IMPROVEMENTS
MARCH 14,2023
PAGE#2
This project has been completed in accordance with the approved plans and specifications and statf recommends that the City Council accept the project as complete.

Loq kwasiel,1111OLdil MUZ*01:4

FISCAL IMPACT
Z
•
Construction Contract
Net increase in Contract Quantities
Final Construction Cost
Design
Construction Inspection
Materials Testing
110774MR11117.1moffs Was rFM 111111AR-111trI� 111611
oil MMMM77 I • M6
Account -
57-1-6880
Measure M Local Return funds
$300,000
Senate Bill (SB1) Local Return funds
$400,000
Measu e R Local Return funds
I off
Total Proiect Fundi •
I off

ATTACHMENT
Attachment A — Plans

tat i gill
N11 5
H N
pfif
t rl 112;
H 1.1 3 lit,
a R
ig
L�
M.
i

ATTACHMENT A

,'Ah
Ivr
� R
* e
}
R
F
_
4B:
�F
e�
kK
k >fi«a
Er
1 k'a
LOON
as

I
.Ya
'age
tti
-q
CP)
. ........ . .
77 YF
d

← All documents from this meeting