CAPITAL --• PROJECT NO. 23-26
FIRE • NO. 4 FIRE DAMAGE REPAIR AND RECONSTRUCTION
MARCH, 14, 2023
PAGE #2
't was estimated that the cost • • restoration and reconstruction • the fire station would se approximately $700,000.

The City hired an architectural firm to re-evaluate the building conditions and extent • necessary repairs and subsequently prepared plans and specifications for the fire damage repair work. The • September 15, 2022, the project was advertised • bids and on October • 2022 the City Clerk received and publicly opened four bids. On October 25, 2022, the City Council awarded a construction contract in the amount of $143,888 to Global Builders, Inc. for the Fire Station • 4 Fire Damage Repair and Reconstruction project.

On December 5, 2022 work commenced on the Fire Station No. 4 Fire Damage Repair and Reconstruction Project. To date, the framing work on the fire -damaged walls, roof trusses, sheat panels and roof sheathing have been repaired; new insulation has been placed in the interior walls and drywall, paint, flooring and bathroom tile have been completed.

Due to the recent rains, it was discovered that the existing reinforced thermoplastic polyolefin (TPO) roof membrane material was further damaged during the fire extinguishing efforts and the removal of the damaged building materials than previously determined. In addition, roof leaks in the apparatus room and the 2nd floor dormitories were noticed. Therefore, the replacement of the roof over the entire fire station to further safeguard the City's renovated and modernized improvements at the fire station is recommended. The estimated cost for the additional work to replace the entire roof at the fire station is $158,688. 1 107m- It

FISCAL IMPACT
The `:• estimated total cost • the project, including rehabilitation work, consultant services, contract administration, and change orders is $545,000 broken •• as follows:

CAPITAL •-• PROJECT NO. 23-26
FIRE STATION NO. 4 FIRE DAMAGE REPAIR AND RECONSTRUCTION MARCH 14,2023
PAGE #3
i� S- -A, 11 - I
�-Fl rFN71S1w&7FTTF1K0Y�#, M - f 4
work will be handled through a claim transaction with the City's insurer.