12. Receive and File ADA Transition Plan Annual Review and Update

Downey City Council
November 28, 2023

Document
12. Receive and File ADA Transition Plan Annual Review and Update
Meeting
November 28, 2023
Body
Downey City Council
Pages
16
Original file
35 KB
Text extracted from the city's file for reading and search. Open the original on lf.downeyca.org. That file is the official record.

Item No.

TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

FROM: OFFICE OF THE CITY MANAGER
BY: MATTHEW BAUMGARDNER, P.E., DIRECTOR OF PUBLIC WORKS/

CITY ENGINEER

DATE: NOVEMBER 28, 2023

SUBJECT: RECEIVE AND FILE THE CITY OF DOWNEY AMERICANS WITH

DISABILITIES ACT (ADA) TRANSITION PLAN ANNUAL REVIEW AND UPDATE

EXECUTIVE SUMMARY

The City Council will consider receiving and filing the City of Downey’s Americans with Disabilities Act (ADA) Transition Plan Annual Review and Update. The annual review and update of the City’s ADA Transition Plan has been developed to inform the City Council and public of the programs, activities, and infrastructure improvements that have been made over the past year to bring the City’s infrastructure into compliance with the ADA requirements.

RECOMMENDATION

That the City Council:

Receive and file the City of Downey ADA Transition Plan annual review and update.

BACKGROUND

The Americans with Disabilities Act (ADA) requires public agencies to perform a self- evaluation of infrastructure, programs, and activities and develop a plan for bringing infrastructure into compliance with the ADA. Over the last eight years, the City of Downey began working on an ADA program, which included a self-evaluation and development of a transition plan to bring City infrastructure into compliance with the ADA.

The self-evaluation process was conducted in Fiscal Year 2016-2017 by the City's consultant, Disability Access Consultants (DAC), which included inspections of City facilities and public rights-of-way. The inspection findings, including information regarding the type of ADA upgrades and repairs, locations, photographs of those areas, and the estimated dates the findings were scheduled to be repaired, were subsequently developed into a transition plan.

As part of the development of the transition plan, the City reached out to residents and organizations serving the needs of persons with disabilities for input on how the C ity can

APPROVED BY

CITY MANAGER

ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
NOVEMBER 28, 2023
PAGE 2

best serve the needs of persons with disabilities. After the self-evaluation and transition plan were completed, the transition plan was made available for public review on the City’s dedicated ADA webpage on the City’s website . The City appointed an ADA Coordinator to address City-related ADA matters, created an ADA grievance policy and grievance form, dedicated a webpage on the City website for ADA matters , and created various forms of communication in different languages for members of the public to contact the City regarding these items (dedicated telephone line, email address, etc.). The public may submit ADA complaints in person or through the web page , as well as get information on the City transition plan, ADA grievance policy, and related procedures.

On January 23, 2018, the City Council received and filed the City of Downey ADA transition plan. As infrastructure improvements, including ADA upgrades and repairs , occur continuously throughout the year in the adopted Capital Improvement Project (CIP) program, the City Council directed Public Works staff to perform an annual review and update of the transition plan to ensure that the plan remains relevant and obtainable. For the past four years, the City Council received and filed the subsequent City of Downey ADA Transition Plan annual reviews and updates.

ANALYSIS

The City has completed numerous ADA repairs and upgrades to City facilities and public rights-of-way through the CIP program and other routine maintenance activities since the ADA transition plan was completed. Staff has been utilizing the DAC software to assist in tracking ADA repairs and upgrades, which has allowed staff to update the transition plan as needed.

For the period of October 1, 2022 through September 30, 2023, 19 ADA grievances and accommodation requests were received by the City’s ADA Coor dinator and Public Works Department. Of those requests, 5 were resolved by the ADA Coordinator, 13 were addressed by the Public Works Department, and 1 was added to an upcoming CIP that will be completed within the next year.

Furthermore, for the same period, the City has completed approximately 326 sidewalk and driveway approach repairs and upgraded 184 curb access ramps with a total cost of approximately $1,120,405. The following is a summary of the ADA repairs and upgrades completed:

ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
NOVEMBER 28, 2023
PAGE 3

Public Rights-of Ways

Project No. Project Name Locations
Type of
Upgrade
or Repair
CIP No. 21-06
5th Street Pavement Rehabilitation
Project (Brookshire Avenue to
Lakewood Boulevard) 5th Street
Curb Ramps,
Sidewalks &
Driveway
Approaches
CIP No. 22-03
Alleys North and South of Stewart &
Gray Road Pavement Rehabilitation
(Patton Road to Lakewood Boulevard)
Various
locations
Curb Ramps,
Sidewalks &
Driveway
Approaches
CIP No. 22-17
Residential Streets Pavement
Rehabilitation, Area 8
Various
locations
Curb Ramps,
Sidewalks &
Driveway
Approaches
CIP No. 23-01
FY 2022/23 Annual Miscellaneous
Concrete Repairs (Council District 4)
and ADA and Miscellaneous
Improvements (Citywide), Lakewood
Boulevard Parkway Improvements
Various
locations
Curb Ramps,
Sidewalks &
Driveway
Approaches
CIP No. 22-16
Residential Streets Pavement
Rehabilitation, Area 2
Various
locations
Curb Ramps,
Sidewalks &
Driveway
Approaches
CIP No. 22-18
Residential Streets Pavement
Rehabilitation, Area 4
Various
locations
Curb Ramps,
Sidewalks &
Driveway
Approaches

A detailed list of City facilities and public right-of-ways that have been improved to comply with current ADA requirements for the period of October 1, 202 2 through September 30, 2023 is included in Attachment A.

City staff is anticipating that ADA improvements will be implemented on the following public right-of-way intersections and corridors per the “Williams and Rockwell case” settlements, as shown on the next page:

ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
NOVEMBER 28, 2023
PAGE 4

Public Right of Way Locations
Anticipated
Construction
in Fiscal
Year (FY)
Projected
Completion
Telegraph Road - Songfest Avenue to Passons Boulevard
A FY 21/22 6/30/2022 A
Telegraph Road - Serapis Avenue to Manzanar Avenue A FY 22/23 6/30/2023 A Lakewood Boulevard - Cherokee Road to I-5 Freeway B FY 24/25 6/30/2025 B Lakewood Boulevard - Columbia Way to Stewart and Gray
Road A FY 22/23 6/30/2023 A
Lakewood Boulevard - Bellflower Boulevard to Cecilia
Street C FY 20/21 6/30/2024 C
Florence Avenue - Vultee/Arrington Avenue to Birchdale
Avenue D FY 25/26 6/30/2026 D
Florence Avenue - West City Limit (Susan Avenue) to
Pomering Road D FY 25/26 6/30/2026 D
Florence Avenue - Western Avenue to Rives Avenue D FY 25/26 6/30/2026 D Imperial Highway - Smallwood Avenue to Brock Avenue B
FY 21/22 &
22/23 6/30/2023 B
Imperial Highway - Columbia Way to Brookshire Avenue B FY 22/23 6/30/2023 B Firestone Boulevard - Stewart and Gray Road to East City Limit C FY 23/24 6/30/2024 C
Stewart & Gray Road - Bellflower Boulevard (Corrigan
Avenue) to Lakewood Boulevard FY 23/24 6/30/2024
Paramount Boulevard - Irwingrove Drive to Lubec Street
FY 23/24 &
24/25 6/30/2025
Gardendale Street - Brookshire Avenue to Garfield
Avenue
FY 24/25,
25/26 &
26/27 6/30/2027
Downey Avenue - I-5 Freeway to Firestone Boulevard
FY 26/27 &
27/28 6/30/2028
Paramount Boulevard - Conrad Street to Stewart and
Gray Road FY 28/29 6/30/2029
Paramount Boulevard - Phlox Street to 5th Street
FY 28/29,
29/30 &
30/31 6/30/2031

ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
NOVEMBER 28, 2023
PAGE 5

Firestone Boulevard - West City Limit to Stewart and Gray Road
FY 31/32,
32/33 &
33/34 6/30/2034
Imperial Highway at Rives Avenue B FY 24/25 6/30/2025 B Imperial Highway at Downey Avenue B FY 24/25 6/30/2025 B Imperial Highway at Dolan Avenue B FY 24/25 6/30/2025 B Imperial Highway at Orizaba Avenue B FY 24/25 6/30/2025 B Imperial Highway at Old River School Road A FY 21/22 6/30/2022 A Imperial Highway at La Reina Avenue B FY 24/25 6/30/2025 B Imperial Highway at Ryerson Avenue B FY 24/25 6/30/2025 B Imperial Highway at Erickson Avenue B FY 24/25 6/30/2025 B Lakewood Boulevard at Donovan Avenue A FY 21/22 6/30/2023 A Lakewood Boulevard at Muller Street B FY 24/25 6/30/2025 B Lakewood Boulevard at 6th Street B FY 24/25 6/30/2025 B Lakewood Boulevard at Priscilla Street A FY 21/22 6/30/2023 A Lakewood Boulevard at 7th Street B FY 24/25 6/30/2025 B Lakewood Boulevard at Meadow Avenue A FY 21/22 6/30/2023 A Lakewood Boulevard at Rosecrans Avenue C FY 23/24 6/30/2024 C Lakewood Boulevard at Hall Road A FY 21/22 6/30/2022 A
Lakewood Boulevard at Cleta Street A FY 21/22 6/30/2022 A Lakewood Boulevard at Deming Street C FY 23/24 6/30/2024 C Lakewood Boulevard at Rose Avenue A FY 21/22 6/30/2023 A Lakewood Boulevard at Buckles Street A FY 21/22 6/30/2022 A Lakewood Boulevard at Gotham Street B FY 24/25 6/30/2025 B Lakewood Boulevard at Gardendale Street C FY 23/24 6/30/2024 C Lakewood Boulevard at Dalen Street C FY 23/24 6/30/2024 C

A Project work completed.

Project was originally scheduled to be completed in FY 19/20 or 21/22, however due to delay in availability of project funding, the project will be completed in FY 2 4/25.

C Project was originally scheduled to be completed in FY 20/21, 21/22 or 22/23, however due to delay in availability of project funding, the project will be completed in FY 2 3/24.

D Project was originally scheduled to be completed in FY 20/21, however due to delay in availability of project funding, the project will be completed in FY 25/26.

ADA TRANSITION PLAN ANNUAL REVIEW AND UPDATE
NOVEMBER 28, 2023
PAGE 6

The total cost for ADA repairs and upgrades that have been completed over the last seven years is approximately $7.3 million. Over the next year, staff is anticipating implementing over $1 million in ADA improvements and concrete sidewalk repairs as part of the Measure M and Measure R bond-funded street rehabilitation project at various locations in the City.

CITY COUNCIL PRIORITIES

Quality of Life, Infrastructure & Parks

FISCAL IMPACT

There is no fiscal impact.

ATTACHMENTS

Attachment A - Detailed List of ADA Repairs and Upgrades Completed Attachment B - Map of ADA Repairs and Upgrades Completed

Detailed List of ADA Repairs and Upgrades Completed
(Through September 30, 2023)

Public Rights-of Ways:

Capital Improvement Project No. 21-06
5th Street Pavement Rehabilitation Project (Brookshire Avenue to Lakewood Boulevard)

Curb Ramps
• Southwest Corner of 5th Street and Birchdale Avenue
• Southeast Corner of 5th Street and Birchdale Avenue
• Northeast Corner of 5th Street and Birchdale Avenue
• Northwest Corner of 5th Street and Birchdale Avenue
• Northeast Corner of 5th Street and Bellman Avenue
• Northwest Corner of 5th Street and Bellman Avenue
• Northeast Corner of 5th Street and Tristan Drive
• Northwest Corner of 5th Street and Tristan Drive
• Northeast Corner of 5th Street and Marbel Avenue
• Northwest Corner of 5th Street and Marbel Avenue

Sidewalk & Driveway Approaches
• Driveway approach and sidewalk installation east side of Birchdale Avenue from 5th Street to Cul- de-Sac South
• Driveway approaches and various sidewalk locations on the south side of 5th Street from Birchdale Avenue to Tristan Drive
• Driveway approaches and various sidewalk locations on the north side of 5th Street from Tristan Drive to Marbel Avenue
• Driveway approaches and various sidewalk locations on north side of 5th Street from Marbel Avenue to Lakewood Boulevard

Capital Improvement Project No. 22-03
Alleys North and South of Stewart & Gray Road Pavement Rehabilitation (Patton Road to Lakewood Boulevard)

Curb Ramps
• North side of Driveway Approach for Alleyway north of Stewart and Gray Road and east of Patton Road
• South side of Driveway approach for Alleyway north of Stewart and Gray Road and east of Patton Road
• West side of Driveway approach for Alleyway north of Stewart and Gray Road and west of Lakewood Boulevard
• East side of Driveway approach for Alleyway north of Stewart and Gray Road and west of Lakewood Boulevard
• North side of Driveway approach for Alleyway south of Stewart and Gray Road and east of Patton Road
• South side of Driveway approach for Alleyway south of Stewart and Gray Road and east of Patton Road
• East side of Driveway approach for Alleyway south of Stewart and Gray Road and west of Lakewood Boulevard

ATTACHMENT A

• West side of Driveway approach for Alleyway south of Stewart and Gray Road and west of Lakewood Boulevard

Sidewalk & Driveway Approaches
• Driveway approach and sidewalk for Alleyway north of Stewart and Gray Road and east of Patton Road
• Driveway approach and sidewalk for Alleyway north of Stewart and Gray Road and west of Lakewood Boulevard
• Driveway approach and sidewalk for Alleyway south of Stewart and Gray Road and east of Patton Road
• Driveway approach and sidewalk for Alleyway south of Stewart and Gray Road and west of Lakewood Boulevard

Capital Improvement Project No. 22-17
Residential Streets Pavement Rehabilitation, Area 8

Curb Ramps
• Southeast Corner of Alameda Street and Birchdale Avenue • Southwest Corner of Alameda Street and Birchdale Avenue • Southeast Corner of Alameda Street and Blodgett Avenue • Southwest Corner of Alameda Street and Blodgett Avenue • Southeast Corner of Alameda Street and Caladre Avenue • Southwest Corner of Alameda Street and Caladre Avenue • Southeast Corner of Alameda Street and Dolan Avenue
• Southwest Corner of Alameda Street and Dolan Avenue
• Northwest Corner of Alameda Street and Downey Avenue
• Northeast Corner of Alameda Street and Downey Avenue
• Southeast Corner of Alameda Street and Downey Avenue
• Southwest Corner of Alameda Street and Downey Avenue
• Southeast Corner of Alameda Street and Gneiss Avenue
• Southwest Corner of Alameda Street and Gneiss Avenue
• Northeast Corner of Alameda Street and Gurley Avenue
• Northwest Corner of Alameda Street and Gurley Avenue
• Northeast Corner of Alameda Street and Marbel Avenue
• Northwest Corner of Alameda Street and Marbel Avenue
• Southeast Corner of Alameda Street and Marbel Avenue
• Southwest Corner of Alameda Street and Marbel Avenue
• Northeast Corner of Alameda Street and Patton Road
• Northwest Corner of Alameda Street and Patton Road
• Southeast Corner of Birchdale Avenue and Boyson Street • Southwest Corner of Birchdale Avenue and Boyson Street • Northeast Corner of Birchdale Avenue and Boyson Street • Northwest Corner of Birchdale Avenue and Boyson Street • Southeast Corner of Birchdale Avenue and Donovan Street • Northeast Corner of Birchdale Avenue and Donovan Street • Southeast Corner of Birchdale Avenue and Meadow Road
• Northeast Corner of Birchdale Avenue and Meadow Road
• Southeast Corner of Birchdale Avenue and Melva Street • Northeast Corner of Birchdale Avenue and Melva Street

• Southeast Corner of Birchdale Avenue and Mory Street
• Northeast Corner of Birchdale Avenue and Mory Street
• Southeast Corner of Birchdale Avenue and Springer Street • Northeast Corner of Birchdale Avenue and Springer Street • Southeast Corner of Buckles Street and Corrigan Avenue • Northwest Corner of Buckles Street and Bellflower Boulevard • Southwest Corner of Buckles Street and Bellflower Boulevard • Southeast Corner of Cavel Street and Brookshire Avenue • Northeast Corner of Cole Street and Brookshire Avenue • Southeast Corner of Cole Street and Brookshire Avenue • Northwest Corner of Conrad Street and Montgomery Street • Southeast Corner of Conrad Street and Brock Avenue
• Southwest Corner of Conrad Street and Brock Avenue
• Northwest Corner of Donovan Street and Downey Avenue
• Southwest Corner of Donovan Street and Lakewood Boulevard Frontage Road • Northwest Corner of Gurley Avenue and Duesler Street
• Southeast Corner of Gurley Avenue and Boyne Street
• Northwest Corner of Hondo Street and Downey Avenue
• Northeast Corner of Marbel Avenue and Donovan Street
• Northwest Corner of Marbel Avenue and Donovan Street
• Northeast Corner of Melva Street and Blodgett Avenue
• Southeast Corner of Mory Street and Marbel Avenue
• Southwest Corner of Mory Street and Marbel Avenue
• Southeast Corner of Orange Street and Caladre Avenue
• Southwest Corner of Orange Street and Caladre Avenue
• Northeast Corner of Orange Street and Gneiss Avenue
• Northwest Corner of Orange Street and Gneiss Avenue
• Southeast Corner of Orange Street and Gneiss Avenue
• Southwest Corner of Orange Street and Gneiss Avenue
• Southwest Corner of Orange Street and Montgomery Street • Southeast Corner of Orange Street and Orizaba Avenue
• Southwest Corner of Orange Street and Orizaba Avenue
• Southwest Corner of Patton Road and Boyne Street
• Northeast Corner of Patton Road and Nada Street

Sidewalk & Driveway Approaches
• Various Sidewalk Improvements along the north side of Alameda Street from Downey Avenue to Brookshire Avenue
• Various Sidewalk Improvements along the south side of Albia Street from Paramount Boulevard to Cul-de-Sac East
• Various Sidewalk Improvements along the north side of Boyne Street from Brookshire Avenue to Birchdale Avenue
• Various Sidewalk Improvements along the south side of Boyne Street from Brookshire Avenue to Birchdale Avenue
• Various Sidewalk Improvements along the north side of Buckles Street from Lakewood Boulevard to Bellflower Boulevard
• Various Sidewalk Improvements and Driveway Approaches on the north side of Cole Street from Brookshire Avenue to Patton Road

• Various Sidewalk Improvements and Driveway Approaches on the south side of Cole Street from Brookshire Avenue to Patton Road
• Various Sidewalk Improvements and Driveway Approaches on the north side of Conrad Street from Montgomery Street to Cul-de-Sac East
• Various Sidewalk Improvements along the south side of Melva Street from Marbel Avenue to Lakewood Boulevard Frontage Road
• Various Sidewalk Improvements and Driveway Approaches on the north side of Alameda Street from Orizaba Avenue to Anderberg Avenue

Capital Improvement Project No. 23-01
FY 2022/23 Annual Miscellaneous Concrete Repairs (Council District 4) and ADA and Miscellaneous Improvements (Citywide), Lakewood Boulevard Parkway Improvements

Curb Ramps
• Northeast Corner of 2nd Street and Myrtle Street
• Southeast Corner of 2nd Street and Myrtle Street
• Northeast Corner of Ardine Street and Newville Avenue • Northwest Corner of Ardine Street and Newville Avenue • Northeast Corner of Arnett Street and Norlain Avenue
• Northwest Corner of Arnett Street and Norlain Avenue
• Northeast Corner of Florence Avenue and Arrington Avenue • Northwest Corner of Florence Avenue and Arrington Avenue • Northwest Corner of Fostoria Street and Newville Avenue • Southwest Corner of Fostoria Street and Newville Avenue • Northwest Corner of Fostoria Street and Newville Avenue • Northeast Corner of Golden Avenue and Barlin Avenue
• Northeast Corner of Lakewood Boulevard and Meadow Road • Northeast Corner of Muller Street and Haledon Avenue
• Northwest Corner of Muller Street and Haledon Avenue
• Southeast Corner of Muller Street and Haledon Avenue
• Southwest Corner of Muller Street and Haledon Avenue
• Northwest Corner of Metro Street and True Avenue
• Southwest Corner of Metro Street and True Avenue
• Southeast Corner of Pangborn Avenue and Gotham Street • Southwest Corner of Pangborn Avenue and Gotham Street

Sidewalk & Driveway Approaches
• Various sidewalk locations along the south side of 2nd Street from Myrtle Street to La Reina Avenue
• Various sidewalk locations along the south side of Albia Street from cul-de-sac west to Brookshire Avenue
• Various sidewalk locations along the north side of Arnett Street from Norlain Avenue to Pomering Road
• Various sidewalk locations on the east side of Bellflower Boulevard from Iowa Street to Lakewood Boulevard
• Various sidewalk locations along the west side of Birchdale Avenue from 5th Street to 6th Street • Various sidewalk locations along the north side of Buell Street from Pangborn Avenue to Lesterford Avenue

• Various sidewalk locations along the south side of Byers Street from cul-de-sac west to Brookshire Avenue
• Various sidewalk locations along east side of Chaney Avenue from Brookpark Road to Cedartree Road
• Various sidewalk locations along the south side of Devenir Avenue from Sandy Lane to Barlin Avenue
• Various sidewalk locations along the east side of Dolan Avenue from Davis Street to Iowa Street • Various driveway approaches along the east side of Faust Avenue from Branscomb Street to Priscilla Street
• Various sidewalk locations along the north side of Florence Avenue from Arrington Avenue to Woodruff Avenue
• Various sidewalk locations along the north side of Florence Avenue from Birchdale Avenue to Tristan Drive
• Various sidewalk locations along the west side of Gaybrook Avenue from Via Amorita to Cul-de-Sac north
• Various sidewalk locations along the north side of Imperial Highway from Paramount Boulevard to Downey Avenue
• Various sidewalk locations along the west side of Lakewood Boulevard from Imperial Highway to Meadow Road
• Various sidewalk locations along the west side of Lakewood Boulevard from Meadow Road to Donovan Street
• Various sidewalk locations along the west side of Lakewood Boulevard from Donovan Street to Alameda Street
• Various sidewalk locations along the west side of Lakewood Boulevard from Meadow Road to Donovan Street
• Various sidewalk locations along the east side of Lakewood Boulevard from Imperial Highway to Columbia Way
• Various sidewalk locations along the east side of Lakewood Boulevard from Columbia Way to Alameda Street
• Various sidewalk locations along the north side of Metro Street from Songfest Drive to True Avenue • Various sidewalk locations along the south side of Metro Street from Songfest Drive to True Avenue • Various sidewalk locations along the east side of Norlain Avenue from Neo Street to Arnett Street • Various sidewalk locations along the south side of Stewart & Gray Road from Patton Road to Lakewood Boulevard
• Various sidewalk locations along the east side of Studebaker Road from Dollison Drive to Florence Avenue
• Various sidewalk locations along the west side of Woodruff Avenue from Hall Road to Firestone Boulevard
• Various sidewalk locations along the east side of Woodruff Avenue from Stewart & Gray Road to Firestone Boulevard

Capital Improvement Project No. CIP No. 22-16
Residential Streets Pavement Rehabilitation, Area 2

Curb Ramps
• Southwest Corner of Stamps Road and Vista Del Rosa Street • Southeast Corner of Elmont Avenue and Vista Del Rosa Street • Northwest Corner of Birchbark Avenue and Birchcrest Road • Northeast Corner of Birchbark Avenue and Birchcrest Road

• Northeast Corner of Allengrove Street and Parrot Avenue • Southeast Corner of Allengrove Street and Parrot Avenue • Southwest Corner of Suva Street and Bellder Drive
• Southeast Corner of La Reina Avenue and Otto Street
• South side of Driveway approach for Alleyway north of Florence Avenue and west of Orizaba Avenue

Sidewalk & Driveway Approaches
• Various sidewalk and driveway approach locations along north and south side of Allengrove Street between Parrot Avenue and Brock Avenue
• Various sidewalk and driveway approach locations along north and south side of Parrot Avenue between Allengrove Street and end of cul-de-sac
• Various sidewalk locations along west and east side of Parrot Avenue between Gallatin Road and Allengrove Street
• Various sidewalk and driveway approach locations along west side of Parrot Avenue between Dinsdale Street and Otto Street
• Various sidewalk and driveway approach locations along west and east side of Stamps Road between Brookpark Road and Vista Del Rosa Street
• Various sidewalk and driveway approach locations along west and east side of Stamps Road between Vista Del Rosa Street and Cedartree Road
• Various sidewalk and driveway approach locations along west and east side of Stamps Road between Cedartree Road and Telegraph Road
• Various sidewalk and driveway approach locations along west side of Stoakes Avenue between Gallatin Road and Vista Del Rio Avenue
• Various sidewalk locations along west side of Stamps Avenue between Gainford Street and Lubec Street
• Various sidewalk locations along west side of Stamps Avenue between Lubec Street and Charloma Drive
• Various sidewalk locations along west side of Stamps Avenue between Charloma Drive and Suva Street
• Various sidewalk and driveway approach locations along north and south side of Vista Del Rosa Street between Elmont Avenue and Birchbark Avenue
• Various driveway approach locations along south side of Vista Del Rosa Street between Birchbark Avenue and Elston Avenue
• Various sidewalk and driveway approach locations along west side of Brookshire Avenue between Gallatin Road and Vista Del Rio Avenue
• Various sidewalk and driveway approach locations along west and east side of La Reina Avenue between Florence Avenue and Otto Street
• Various sidewalk and driveway approach locations along west and east side of Manzanar Avenue between Gallatin Road and Vista Del Rio Avenue
• Various sidewalk and driveway approach locations along north side of Brookgreen Road between Elmont Avenue and Elston Avenue
• Various driveway approach locations along south side of Suva Street between Brookshire Avenue and Bellder Drive
• Various driveway approach locations along south side of Suva Street between Bellder Drive and end of cul-de-sac
• Various sidewalk and driveway approach locations along west side of Orizaba Avenue between Florence Avenue and Dinsdale Street
• Various sidewalk and driveway approach locations along south side of Suva Street between Paramount Boulevard and Parrot Avenue

• Various driveway approach locations along west side of Birchbark Avenue between Birchcrest Road and Telegraph Road
• Various sidewalk locations along east side of Birchdale Avenue between Raviller Drive and Charloma Drive
• Various driveway approach locations along south side of Dacosta Street between La Reina Avenue and end of cul-de-sac
• Various sidewalk locations along east side of Tristan Drive between Florence Avenue and Lubec Street

Capital Improvement Project No. 22-18
Residential Streets Pavement Rehabilitation, Area 4

Curb Ramps
• Northeast Corner of 2nd Street and Rives Avenue
• Northeast Corner of 2nd Street and Smallwood Avenue
• Northwest Corner of 2nd Street and Smallwood Avenue
• Northeast Corner of 3rd Street and Smallwood Avenue
• Northwest Corner of 3rd Street and Smallwood Avenue
• Southeast Corner of 3rd Street and Smallwood Avenue
• Southwest Corner of 3rd Street and Smallwood Avenue
• Southwest Corner of 4th Place and Rives Avenue
• Southeast Corner of 4th Place and Rives Avenue
• Northeast Corner of 4th Place and Rives Avenue
• Northeast Corner of 4th Place and Smallwood Avenue
• Northwest Corner of 4th Place and Smallwood Avenue
• Southeast Corner of 4th Place and Smallwood Avenue
• Southwest Corner of 4th Place and Smallwood Avenue
• Northeast Corner of 4th Street and Smallwood Avenue
• Northwest Corner of 4th Street and Smallwood Avenue
• Southeast Corner of 4th Street and Smallwood Avenue
• Southwest Corner of 4th Street and Smallwood Avenue
• Northeast Corner of 6th Street and Rives Avenue
• Southeast Corner of 6th Street and Rives Avenue
• Northeast Corner of 6th Street and Smallwood Avenue
• Northwest Corner of 6th Street and Smallwood Avenue
• Southeast Corner of 6th Street and Smallwood Avenue
• Southwest Corner of 6th Street and Smallwood Avenue
• Northeast Corner of 7th Street and Rives Avenue
• Southeast Corner of 7th Street and Rives Avenue
• Northeast Corner of 7th Street and Smallwood Avenue
• Northwest Corner of 7th Street and Smallwood Avenue
• Southeast Corner of 7th Street and Smallwood Avenue
• Southwest Corner of 7th Street and Smallwood Avenue
• Northeast Corner of 8th Street and Smallwood Avenue
• Northwest Corner of 8th Street and Smallwood Avenue
• Southeast Corner of 8th Street and Smallwood Avenue
• Southwest Corner of 8th Street and Smallwood Avenue
• Northeast Corner of Dinwiddie Street and Ryerson Avenue

• Northwest Corner of Dinwiddie Street and Ryerson Avenue • Southeast Corner of Dinwiddie Street and Ryerson Avenue • Southwest Corner of Dinwiddie Street and Ryerson Avenue • Northeast Corner of Harper Avenue and Smallwood Avenue • Northwest Corner of Harper Avenue and Smallwood Avenue • Southeast Corner of Harper Avenue and Smallwood Avenue • Southwest Corner of Harper Avenue and Smallwood Avenue • Southwest Corner of Cherokee Drive and Pomering Road
• Northeast Corner of Cherokee Drive and Wiley Burke Avenue • Southeast Corner of Cherokee Drive and Wiley Burke Avenue • Northeast Corner of Farm Street and Rives Avenue
• Northeast Corner of Firestone Place and Old River School Road • Southeast Corner of Firestone Place and Old River School Road • Southwest Corner of Florence Avenue and Rives Avenue
• Southeast Corner of Florence Avenue and Rives Avenue
• Northwest Corner of Julius Avenue and Florence Avenue Frontage Road • Northeast Corner of Harper Avenue and Rives Avenue
• Southeast Corner of Harper Avenue and Rives Avenue
• Northeast Corner of Hopeland Avenue and Florence Avenue Frontage Road • Northeast Corner of Mitla Avenue and De Palma Street
• Northwest Corner of Mitla Avenue and De Palma Street
• Northeast Corner of Mitla Avenue and Adwen Street
• Southeast Corner of Mitla Avenue and Adwen Street
• Northeast Corner of Mitla Avenue and Benares Street
• Southeast Corner of Mitla Avenue and Benares Street
• Northeast Corner of Muller Street and Wiley Burke Avenue • Northwest Corner of Muller Street and Wiley Burke Avenue • Northwest Corner of Neo Street and Haro Street
• Northwest Corner of Neo Street and Adco Street
• Northeast Corner of Pellet Street and Pernell Avenue
• Northwest Corner of Pellet Street and Pernell Avenue
• Northeast Corner of Pellet Street and Ryerson Avenue
• Southeast Corner of Dinwiddie Street and Old River School Road • Northeast Corner of Susan Avenue and Via Amorita
• Northwest Corner of Susan Avenue and Via Amorita
• Southeast Corner of Susan Avenue and Via Amorita
• Southwest Corner of Susan Avenue and Via Amorita

Sidewalks & Driveway Approaches
• Various sidewalk locations on the south side of Arnett Street from Firestone Boulevard to Old River School Road
• Various driveway approaches on the southside of Baysinger Street from Rives Avenue to End of Street East
• Various driveway approaches on the west side of Hopeland Avenue from Irwingrove Drive and Florence Avenue Frontage Road
• Various sidewalk locations on the east side of Pomering Road from Quinn Street to Irwingrove Drive
• Various sidewalk locations on the east side of Julius Avenue from Quinn Street to Irwingrove Drive • Various sidewalk locations on the west side of Julius Avenue from Quinn Street to Irwingrove Drive

• Various sidewalk locations on the north side of Neo Street from Cul-de-Sac West to Haro Street • Various sidewalk locations on the west side of Rives Avenue from Muller Street to Irwingrove Drive • Various sidewalk locations on the east side of Rives Avenue from 8th Street to Farm Street • Various sidewalk and driveway approach locations on the east side of Rives Avenue from Harper Avenue to 8th Street
• Various sidewalk and driveway approach locations on the east side of Rives Avenue from 7th Street to Harper Avenue
• Various sidewalk and driveway approach locations on the east side of Rives Avenue from 6th Street to 7th Street
• Various sidewalk and driveway approach locations on the east side of Rives Avenue from 5th Street to 6th Street
• Various sidewalk and driveway approach locations on the east side of Rives Avenue from 4th Street to 5th Street
• Various sidewalk and driveway approach locations on the east side of Rives Avenue from 4th Place to 4th Street
• Various sidewalk and driveway approach locations on the east side of Rives Avenue from 2nd Place to 3rd Street
• Various sidewalk and driveway approach locations on the east side of Smallwood Avenue from 2nd Street to Farm Street
• Various sidewalk and driveway approach locations on the west side of Smallwood Avenue from 2nd Street to Farm Street
• Various sidewalk and driveway approach locations on the north side of Dinwiddie Street from Rio Hondo Drive to Ryerson Avenue
• Various sidewalk and driveway approach locations on the south side of Dinwiddie Street from Rio Hondo Drive to Ryerson Avenue
• Various sidewalk and driveway approach locations on the north side of Dinwiddie Street from Rio Ryerson Avenue to Old River School Road
• Various sidewalk and driveway approach locations on the south side of Dinwiddie Street from Rio Hondo Drive to Old River School Road
• Various sidewalk locations on west side of Mitla Street from De Palma Street to Cul-De-Sac North • Various sidewalk locations on east side of Mitla Street from De Palma Street to Cul-De-Sac North • Various sidewalk locations on north side of Firestone Place from Old River School Road to Pomering Road
• Various sidewalk locations on north side of Pellet Street from Rio Hondo Drive to Ryerson Avenue • Various sidewalk locations on south side of Pellet Street from Rio Hondo Drive to Ryerson Avenue

ATTACHMENT B