EXECUTIVE SUMMARY
The City Council will consider approving plans and specifications, and authorizing the solicitation of construction bids for the Residential Streets Pavement Rehabilitation - Area 5 and 7 Projects (Project), Capital Improvement Program (CIP) No. 22-20 and 22-21.
These areas are recommended for improvement based on the City’s approved Pavement Management Program.
RECOMMENDATION
That the City Council:
Approve plans and specifications, and authorize solicitation, for construction bids for Residential Streets Pavement Rehabilitation - Area 5 and 7, CIP No. 22-20 and 22-21
BACKGROUND
The City’s Pavement Management Program (PMP) is the primary tool used to prioritize street pavement rehabilitation projects throughout the City. The PMP evaluates, ranks, and prioritizes each City street segment based on surface conditions (cracking, surface failures, etc.), pavement structural strength, and other field observations. The PMP systematically prioritizes areas for pavement rehabilitation through a 10-year work plan in which the City was divided into ten areas as shown on Attachment A.
The residential street segments in each area identified as priorities for improvements are either in a state of minor deterioration and can be inexpensively repaired with minor maintenance methods such as slurry seal, cape seal or overlay while other residential street segments identified are deteriorated to a state of disrepair beyond what ordinarily could be handled through routine street maintenance practices and must be reconstructed. Ultimately, the pavement rehabilitation on the residential street segments
PLANS, SPECIFICATIONS, AND SOLICITATION FOR CONSTRUCTION BIDS FOR RESIDENTIAL STREETS PAVEMENT REHABILITATION - AREAS 5 AND 7, CAPITAL IMPROVEMENT PROJECT (CIP) NOS. 22-20 AND 22-21
FEBRUARY 27, 2024
PAGE 2
will raise the condition of the pavement to an acceptable standard and will extend the life of the infrastructure by 20 years.
ANALYSIS
Both the Area 5 and Area 7 projects have similar design and construction schedules.
Given this, staff has combined the plan sets and specifications in order to bid both projects as one combined project. Combining projects allows the City to leverage economies of scale by creating a project with larger construction quantities than would be typically required by a pavement rehabilitation projects which focuses on only one area.
An additional cost-savings strategy staff will implement is to remove all slurry seal and cape seal streets from this Project and combine them into a single slurry seal project to be constructed in FY 2024-2025. Slurry seal is often a component that the prime contractor will procure a subcontractor to construct. Sub-contractor work is subject to a 5% markup per the City of Downey Boiler Plate Specifications and industry standards. By combining the projects, the City ensures the prime contractor will be one who can construct slurry seal without the use of sub-contractors, therefore negating the 5% markup the City would pay if this work were to be done as a part of this Area 5 and Area 7 project. The slurry seal and cape seal streets to be removed are still listed in Attachment C for the Council’s reference.
The plans (Attachment B) and specifications for the subject Project are complete and the Project is now ready for solicitation of bids. This Project will rehabilitate 158 residential street segments with a total length of approximately 89,600 linear feet or 16.97 miles.
Attachment C provides a list of residential streets that will be overlaid or reconstructed.
The scope of work includes grind and overlay and pavement rehabilitation. This Project will also replace damaged and uplifted sidewalks; curb and gutter; cross gutters; and driveway approaches. Finally, this Project will reconstruct curb access ramps to comply with the latest Americans with Disabilities Act (ADA) standards.
Staff anticipates bidding the Project in March 2024, with construction anticipated to begin in April 2024 and be completed in August 2024. This Project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under Section 15301(c), Existing Facilities.
CITY COUNCIL PRIORITIES
Quality of Life, Infrastructure & Parks
PLANS, SPECIFICATIONS, AND SOLICITATION FOR CONSTRUCTION BIDS FOR RESIDENTIAL STREETS PAVEMENT REHABILITATION - AREAS 5 AND 7, CAPITAL IMPROVEMENT PROJECT (CIP) NOS. 22-20 AND 22-21
FEBRUARY 27, 2024
PAGE 3
FISCAL IMPACT
Approval of the recommended action will result in an estimated expenditure of $11,808,464 Capital Improvement Program (CIP) funds to cover the Total Estimated Project Costs (break down listed in table below).
Description Amount
Design $227,336
Construction Contract $9,703,015
Construction Contract Contingencies (10%) $1,078,113
Construction Inspection $320,000
Soils and Materials Testing $160,000
Construction Engineering and Contract
Administration $320,000
Total Estimated Project Cost: $11,808,464
There are sufficient fund balances in the approved Fiscal Year 2023-2024 CIP budget for the recommended actions, as shown in the table below:
Account
No. Funding Source Amount
58-1-6876 Fund 58 (Measure M Bond) $177,336
32-1-6877 Fund 32 (Senate Bill 1) $300,000
38-1-6877 Fund 38 (Vehicle Impact Fee) $2,230,000
56-1-6877 Fund 56 (Measure R Local Return) $750,000
57-1-6877 Fund 57 (Measure M Local Return) $790,000
58-1-6877 Fund 58 (Measure M Bond) $830,300
58-1-6879 Fund 58 (Measure M Bond)
Transfer from CIP 22-23 - Area 6 $2,067,365
59-1-6879 Fund 59 (Measure R Bond)
Transfer from CIP 22-23 - Area 6 $3,637,135
58-1-6823
Fund 58 (Measure M Bond)
Transfer from CIP 3rd Street Pavement Rehabilitation
Project
$201,328
57-1-6824
Fund 57 (Measure M Local Return)
Transfer from CIP 22-04 Imperial Highway Pavement
Rehabilitation
$250,000
56-1-6832
Fund 56 (Measure R Local Return)
Transfer from CIP Annual Citywide Traffic Striping of
Roadways
$80,000
PLANS, SPECIFICATIONS, AND SOLICITATION FOR CONSTRUCTION BIDS FOR RESIDENTIAL STREETS PAVEMENT REHABILITATION - AREAS 5 AND 7, CAPITAL IMPROVEMENT PROJECT (CIP) NOS. 22-20 AND 22-21
FEBRUARY 27, 2024
PAGE 4
57-1-6624 Fund 57 (Measure M Local Return)
Transfer from CIP Miscellaneous Bridge Repairs $95,000
56-1-6787 Fund 56 (Measure R Local Return)
Transfer from CIP Entry Monument Signs $75,000
56-1-6843
Fund 56 (Measure R Local Return)
Transfer from CIP Citywide Median Landscape
Enhancements
$25,000
32-1-6906
Fund 32 (Senate Bill 1)
Transfer from CIP Lakewood Boulevard Pavement
Rehabilitation
$200,000
57-1-6896
Fund 57 (Measure M Local Return)
Transfer from CIP Traffic Signal at Ardis
Ave./Charlemagne Ave. and Foster Road
$100,000
Total Estimated Project Cost: $11,808,464
A detailed Project cost summary will be provided at the time of the award of the construction contract.
ATTACHMENTS
Attachment A – 10-Year Workplan Area Identification Map Attachment B – Plans
Attachment C – Project Location Lists
ATTACHMENT A
SS
ENTER
DONOTENTER
S
S
SSSS
SS SSS
S
S
S
S
SS
S
S
Project Location Lists
Asphalt Overlay Street Segments
Street Limits Approx.
Length
(LF)
Approx.
Area
(SF) From To
1 Bellder Drive Via Amorita Farm Street 524 15,720
2 Bigby
Avenue Birchdale Avenue Bellder Drive 423 12,690
3 Birchdale
Avenue Via Amorita Cherokee Drive 824 29,664
4 Cleta Street Downey Avenue Brookshire Avenue 1,135 34,050 5 De Palma
Street Paramount Boulevard Gurley Avenue 1,362 49,032
6 De Palma
Street Gurley Avenue Downey Avenue 466 16,776
7 11th Street Brookshire Avenue Birchdale Avenue 892 26,760 8 Farm Street Bellder Drive Birchdale Avenue 390 11,700 9 Fontana
Street Brookshire Avenue Patton Road 708 25,488
10 La Reina
Avenue 4th Street 3rd Street 367 13,212
11 La Reina
Avenue Florence Avenue 7th Street 2,164 77,904
12 La Reina
Avenue 7th Street 6th Street 462 16,632
13 La Reina
Avenue 6th Street 5th Street 463 16,650
14 Myrtle Street 3rd Street 4th Street 257 6,168
15 Myrtle Street 4th Street 5th Street 258 6,192
16 6th Street
New Street (Downey
Avenue) La Reina Avenue 411 12,330
17 6th Street La Reina Avenue Western Avenue 412 12,360 18 Stamps
Road Cherokee Drive
300' North of
Cherokee Drive 300 11,400
19 3rd Street West Cul-De-Sac Lakewood Boulevard 308 11,088 20 Via Amorita Birchdale Avenue Bellder Drive 403 12,090 21 Via Amorita Bellman Avenue Birchdale Avenue 285 8,550 22 Western
Avenue 5th Street 6th Street 459 15,606
23 Western
Avenue 7th Street Florence Avenue 2,171 73,814
24 Western
Avenue 6th Street 7th Street 469 15,946
ATTACHMENT C
Asphalt Overlay Street Segments
Street Limits Approx.
Length
(LF)
Approx.
Area
(SF) From To
25 Iowa Street Dolan Avenue Brookshire Avenue 613 24,520 26 Muller Street West Cul-De-Sac Tristan Drive 922 27,660 27 Stamps
Road 7th Street Cherokee Drive 587 17,610
28 Adwen
Street Horley Avenue Rives Avenue 325 9,100
29 Adwen
Street Richeon Avenue Horley Avenue 285 7,980
30 Benares
Street Julius Avenue Norlain Avenue 594 20,196
31 Brookmill
Road Rives Avenue Morning Avenue 728 24,752
32 Brookmill
Road Morning Avenue Pruess Avenue 180 6,120
33 Brookmill
Road Pruess Avenue Samoline Avenue 269 9,146
34 Brookmill
Road Samoline Avenue Paramount Boulevard 338 11,492
35 Burns
Avenue Rives Avenue Paramount Boulevard 1,475 35,400
36 Corey Street Pomering Road Cul-De-Sac 200 4,600
37 Heritage
Circle Roundabout N/S Heritage Circle 635 13,970
38 Heritage
Circle Roundabout S/S Heritage Circle 681 14,982
39 Heritage
Circle Heritage Circle Stewart & Gray Road 131 3,668
40 Horley
Avenue Adwen Street Arnett Street 666 17,982
41 Julius
Avenue Stewart & Gray Road Luxor Street 728 24,752
42 Julius
Avenue Luxor Street Benares Street 285 9,690
43 Julius
Avenue Hondo Street Rundell Street 1,053 35,802
44 Kingbee
Street Rives Avenue Samoline Avenue 1,315 48,655
45 Luxor Street
Old River School
Road Norlain Avenue 276 9,384
46 Luxor Street Norlain Avenue Julius Avenue 560 19,040 47 Luxor Street Rives Avenue Cul-De-Sac 390 11,700
Asphalt Overlay Street Segments
Street Limits Approx.
Length
(LF)
Approx.
Area
(SF) From To
48 Mitla Avenue Cole Street Nada Street 262 6,288
49 Nada Street Richeon Avenue Horley Avenue 305 6,710
50 Norlain
Avenue Benares Street Luxor Street 289 9,826
51 Norlain
Avenue Neo Street Arnett Street 436 14,824
52 Norlain
Avenue Hondo Street Pomering Road 859 23,193
53 Phlox Street Samoline Avenue Paramount Boulevard 235 7,755 54 Phlox Street Rives Avenue Horton Avenue 918 24,786
55 Pivot Street Julius Avenue Horton Avenue 253 6,831
56 Pivot Street Horton Avenue Rives Avenue 905 24,435
57 Pomering
Road Norlain Avenue Hondo Street 788 21,276
58 Pomering
Road Cul-De-Sac Laura Street 253 6,831
59 Pomering
Road Rundell Street Corey Street 272 7,344
60 Pomering
Road Corey Street Yankey Street 413 11,151
61 Quill Drive Samoline Avenue Paramount Boulevard 223 1,561 62 Rives
Avenue Stewart & Gray Road Adwen Street 1,735 69,400
63 Rives
Avenue Adwen Street Arnett Street 328 12,136
64 Rives
Avenue Arnett Street Burns Avenue 920 36,800
65 Rives
Avenue Burns Avenue Firestone Boulevard 456 16,416
66 Rundell
Street
Old River School
Road Julius Avenue 849 28,866
67 Rundell
Street Julius Avenue Rives Avenue 1,272 43,248
68 Ryerson
Avenue Emily Lane Cul-De-Sac 292 10,804
69 Samoline
Avenue Brookmill Road Cul-De-Sac 1,092 30,576
70 Yankey
Street Pomering Road Cul-De-Sac 190 4,370
Subtotal = 42,694 1,365,450
Reconstruction Street Segments
Street Limits Approx.
Length
(LF)
Approx.
Area
(SF) From To
1 Baysinger Street Bellman Avenue Tristan Drive 233 6,990 2 Bellman Avenue Cherokee Drive 7th Street 495 17,820
3 Bellman Avenue Fontana Avenue Buckles Street 502 15,060 4 Birchdale Avenue Cherokee Drive 7th Street 500 18,000 5 Birchdale Avenue 7th Street Muller Street 270 9,720
6 Birchdale Avenue 5th Street 6th Street 344 10,320
7 Buckles Street Bellman Avenue Tristan Drive 259 9,324 8 Buckles Street Tristan Drive
Lakewood
Boulevard 744 26,784
9 Cleta Street
Brookshire
Avenue Patton Road 725 27,550
10 Davis Street Dolan Avenue Downey Avenue 499 19,960
11 Davis Street
Brookshire
Avenue Dolan Avenue 623 24,920
12 Deming Avenue Fontana Avenue
North Cul-De-
Sac 144 4,896
13 Dolan Avenue 5th Street 6th Street 335 11,390
14 Dolan Avenue Galt Drive Iowa Street 958 38,320
15 Fontana Street Patton Road Tristan Drive 555 19,980
16 Fontana Street Tristan Drive Deming Avenue 505 18,180 17 Fontana Street Downey Avenue
Brookshire
Avenue 1,121 40,356
18 4th Street
Paramount
Boulevard Myrtle Street 544 20,672
19 4th Street Myrtle Street
La Reina
Avenue 666 25,308
20 4th Street La Reina Avenue Downey Avenue 666 25,308
21 Gurley Avenue De Palma Street Manatee Street 918 27,540 22 Gurley Avenue Manatee Street Arnett Street 731 21,930 23 Iowa Street Downey Avenue Dolan Avenue 548 21,920
24 La Reina Avenue
Firestone
Boulevard Nance Street 295 7,080
25 La Villa Street Downey Avenue
East Cul-De-
Sac 859 27,488
26 Lakewood Boulevard
Frontage Road Buckles Street Cleta Street 348 9,744
27 Luxor Street Downey Avenue
Brookshire
Avenue 1,135 34,050
28 Luxor Street
Brookshire
Avenue Patton Road 708 21,240
Reconstruction Street Segments
Street Limits Approx.
Length
(LF)
Approx.
Area
(SF) From To
29 Manatee Street Patton Road
Brookshire
Avenue 712 27,056
30 Marbel Avenue Fontana Avenue
North Cul-De-
Sac 230 7,360
31 Myrtle Street 7th Street
North Cul-De-
Sac 571 20,556
32 Myrtle Street
Railroad Right-Of-
Way
Firestone
Boulevard 312 12,480
33 Myrtle Street
Firestone
Boulevard 2nd Street 381 13,716
34 Myrtle Street 2nd Street 3rd Street 350 12,600
35 Nance Street Myrtle Street
La Reina
Avenue 610 24,400
36 Nash Avenue
Railroad Right-Of-
Way McCahill Street 131 3,668
37 New Street 5th Street 6th Street 449 16,164
38 New Street Downey Avenue 6th Street 187 4,488
39 Patton Road
Stewart & Gray
Road Fontana Street 312 12,480
40 Patton Road Fontana Avenue Cleta Street 1,174 46,960 41 Quinn Street Bellman Avenue
East Cul-De-
Sac 331 8,606
42 Quinn Street Birchdale Avenue
West Cul-De
Sac 446 11,596
43 7th Street
Paramount
Boulevard Downey Avenue 1,532 55,152
44 7th Street West Cul-De Sac
Birchdale
Avenue 275 7,150
45 7th Street Birchdale Avenue Bellman Avenue 430 11,180 46 7th Street Bellman Avenue Marbel Avenue 551 19,836
47 7th Street Marbel Avenue
Lakewood
Boulevard 390 14,040
48 6th Street
Lakewood
Boulevard Tristan Drive 708 25,488
49 6th Street Tristan Drive
Birchdale
Avenue 462 13,860
50 6th Street Birchdale Avenue
Brookshire
Avenue 610 18,300
51 6th Street
Brookshire
Avenue Dolan Avenue 630 22,680
52 6th Street Dolan Avenue Downey Avenue 813 29,268
Reconstruction Street Segments
Street Limits Approx.
Length
(LF)
Approx.
Area
(SF) From To
53 Texas Street Downey Avenue Dolan Avenue 508 19,304
54 Tristan Drive Fontana Avenue Buckles Street 476 17,136 55 Tristan Drive Cherokee Drive
Baysinger
Street 1,230 44,280
56 Tristan Drive Muller Street 6th Street 289 8,670
57 Tristan Drive 6th Street 5th Street 390 11,700
58 Adwen Street
Old River School
Road Julius Avenue 931 26,068
59 Adwen Street Julius Avenue Horton Avenue 256 7,168
60 Adwen Street Horton Avenue Richeon Avenue 289 8,092
61 Burns Avenue
Old River School
Road Rives Avenue 2,216 48,752
62 Cole Street Cul-De-Sac Pernell Avenue 249 8,217
63 Cole Street Pernell Avenue Pernell Avenue 157 5,181
64 Cole Street Pernell Avenue Mitla Avenue 397 13,101
65 Horley Avenue Yankey Street Cul-De-Sac 302 8,154
66 Horley Avenue Cul-De-Sac Loop End 134 3,082
67 Julius Avenue Adwen Street Cul-De-Sac 134 4,556
68 Leeds Street
Smallwood
Avenue Cul-De-Sac 423 11,421
69 Nada Street Mitla Avenue Pernell Avenue 551 18,183
70 Nada Street Pernell Avenue Cul-De-Sac 308 10,164
71 Nada Street Pomering Road Cul-De-Sac 190 5,320
72 Pernell Avenue Nada Street Cole Street 200 7,000
73 Pernell Avenue Cole Street
Stewart & Gray
Road 289 9,826
74 Pomering Road Laura Street Nada Street 535 20,330
75 Pomering Road Nada Street
Stewart & Gray
Road 502 19,076
76 Quill Road
Old River School
Road Richeon Avenue 1,485 54,945
77 Quill Road Richeon Avenue Rives Avenue 607 21,245
78 Quill Road Rives Avenue Morning Avenue 659 8,567
79 Quill Road Morning Avenue
Samoline
Avenue 407 5,291
80 Ryerson Avenue Imperial Highway Emily Lane 610 22,570 81 Samoline Avenue Quill Drive Hondo Street 298 11,026
82 Samoline Avenue Hondo Street Springer Street 305 11,285 83 Samoline Avenue Springer Street Kingbee Street 321 11,877 84 Samoline Avenue Kingbee Street Melva Street 361 13,357
Reconstruction Street Segments
Street Limits Approx.
Length
(LF)
Approx.
Area
(SF) From To
85 Samoline Avenue Melva Street Albia Street 666 22,644 86 Smallwood Avenue Imperial Highway Leeds Street 522 19,314 87 Smallwood Avenue Cole Street Cul-De-Sac 249 6,723
88 Second St Myrtle St La Reina Ave 633 24,054
Subtotal = 46,906 1,568,613