Item No.

TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

FROM: OFFICE OF THE CITY MANAGER
BY: MATTHEW BAUMGARDNER, DIRECTOR OF PUBLIC

WORKS/CITY ENGINEER

DATE: AUGUST 27, 2024

SUBJECT: ADOPTION OF RESOLUTIONS CERTIFYING AN UPDATE TO THE CITY’S LOCAL ROAD SAFETY PLAN AND AUTHORIZING THE

SUBMITAL OF APPLICATIONS FOR HIGHWAY SAFETY

IMPROVEMENT PROGRAM FUNDS TO IMPLEMENT VARIOUS

TRAFFIC SAFETY PROJECTS

EXECUTIVE SUMMARY

During Fiscal Year 2023-2024, the City Council requested an analysis of traffic conditions throughout the City, focusing on safety and collision history at various intersections in Downey. In 2022, the City Council adopted the Local Road Safety Plan (LRSP), which focuses on collision history, identifying accident trends, and prioritizing projects based on severity of incidents and developing solutions to mitigate and reduce the likelihood of collisions from occurring. Staff met with its traffic engineering consultant and original author of the LRSP, Willdan Engineering (Willdan), and requested an update to the plan.

The resulting update to the LRSP provides a new list of prioritized intersections and corridors requiring safety improvements based on collision data collected between 2020 and 2023. This report provides a summary of actions that staff has taken since the original LRSP was adopted, as well as plans that are being developed to address the prioritized areas outlined in the update. Examples of other traffic safety projects that are currently underway that fall outside of those identified in the LRSP are discussed, as well how the LRSP data is used to apply for new grant funding under Cycle 12 of the Highway Safety Improvement Program (HSIP).

RECOMMENDATION

That the City Council:

1. Discuss the update to the City’s Local Road Safety Plan;

2. Adopt Resolution No. 24-8265, approving the City’s Updated Local Road Safety Plan; and,

3. Adopt Resolution No. 24-8266, approving the submittal of Highway Safety Improvement Program (HSIP) funding applications.

ADOPTION OF RESOLUTIONS CERTIFYING AN UPDATE TO THE CITY’S LOCAL ROAD SAFETY

PLAN AND AUTHORIZING THE SUBMITAL OF APPLICATIONS FOR HIGHWAY SAFETY

IMPROVEMENT PROGRAM FUNDS TO IMPLEMENT VARIOUS TRAFFIC SAFETY PROJECTS AUGUST 27, 2024
PAGE 2

2 BACKGROUND

At its November 14, 2023 meeting, the City Council requested that staff look at traffic safety throughout the City and provide a report at a future meeting. In 2022, staff prepared the Local Road Safety Plan (LRSP), which provides a framework for cities to prioritize roadway safety improvements based on an evaluation of locations with high collision rates. The City Council originally adopted the LRSP at its September 27, 2022 meeting (LRSP 2022). The completion of this plan was a necessary element required by Caltrans prior to applying for any State or Federal grant funding related to traffic safety projects through the Highway Safety Improvement Program (HSIP) – a common source of traffic safety funding for municipalities. The original plan focused on traffic collision data collected between 2015 and 2020.

As part of LRSP 2022, Willdan identified five traffic safety projects that would be competitive under the HSIP Cycle 11 Call for Projects. These projects included:

1) upgrading traffic signal hardware on Firestone Boulevard; 2) pedestrian crosswalk upgrades with high visibility features; 3) bike lane installation on Old River School Road, Brookshire Avenue, and Foster Road;
4) traffic signal upgrades at 11 intersections Citywide; and 5) installing raised medians on Florence Avenue.

Staff did apply for grant funding for these projects as part of Cycle 11 and was successful in getting funding for the pedestrian crosswalk upgrades at two locations on Gardendale Street (Saint Mathias Academy and Hoover Avenue) and on Downey Avenue (Our Load of Perpetual Help School). The funding secured from Cycle 11 is being used for the design construction for these improvements, which will begin in September 2024.

The HSIP funding program is highly competitive, and staff continually looks for other funding sources to address traffic safety projects, such as funding from Metro for bike lane improvements and State and County local return funds that can be used for traffic signal upgrades and raised medians. As an example, staff has developed CIP projects that focus on three of the intersections along Firestone Boulevard. A combination of local return funds (Measure R and Proposition C) and a grant from Metro will fund intersection improvements along Firestone Boulevard at Lakewood Boulevard, Downey Avenue, and Rives Avenue. The design of Firestone Boulevard and Lakewood Boulevard intersection improvements are near completion, and the project will go out to bid for construction in Fall 2024. This intersection is prioritized in LRSP 2024 based on having the highest weighted collision score in the City. As a result, staff anticipates completing this project by the summer of 2025.

ADOPTION OF RESOLUTIONS CERTIFYING AN UPDATE TO THE CITY’S LOCAL ROAD SAFETY

PLAN AND AUTHORIZING THE SUBMITAL OF APPLICATIONS FOR HIGHWAY SAFETY

IMPROVEMENT PROGRAM FUNDS TO IMPLEMENT VARIOUS TRAFFIC SAFETY PROJECTS AUGUST 27, 2024
PAGE 3

3 In response to the City Council’s request from its November 14, 2023 meeting to look at traffic safety Citywide, staff asked Willdan to update the plan (LRSP 2024) to focus on traffic collision data collected between 2020 and 2023 and identify any new collision trends or potential traffic safety projects (see Attachment A).

ANALYSIS

In reviewing the collision data as part of LRSP 2024 for the 4-year period between 2020 and 2023, a prioritization method was established that first identified the locations with the highest number of incidents and then drilled down deeper to score these locations based on the severity of any collisions (ranging from property damage to fatality) and type of incident (e.g., rear-end or broadside). The more severe the collision, the higher the weighted score that is given to that particular incident. The type of collision and cause is helpful in determining a list of potential mitigations that can be used to reduce the likelihood of the collision occurring in the future. A heatmap was created to visually summarize the collision history across the City between 2020 and 2023 (Attachment B).

Intersection Analysis and Recommended Projects
Using the weighted crash scoring, Willdan was able to develop a list of the following ten intersections as the highest priority for traffic safety mitigation:

ADOPTION OF RESOLUTIONS CERTIFYING AN UPDATE TO THE CITY’S LOCAL ROAD SAFETY

PLAN AND AUTHORIZING THE SUBMITAL OF APPLICATIONS FOR HIGHWAY SAFETY

IMPROVEMENT PROGRAM FUNDS TO IMPLEMENT VARIOUS TRAFFIC SAFETY PROJECTS AUGUST 27, 2024
PAGE 4

4 Looking at the types of collisions and their primary causes, Willdan prepared a list of recommended improvements, as shown in the following table:

ADOPTION OF RESOLUTIONS CERTIFYING AN UPDATE TO THE CITY’S LOCAL ROAD SAFETY

PLAN AND AUTHORIZING THE SUBMITAL OF APPLICATIONS FOR HIGHWAY SAFETY

IMPROVEMENT PROGRAM FUNDS TO IMPLEMENT VARIOUS TRAFFIC SAFETY PROJECTS AUGUST 27, 2024
PAGE 5

5 The LRSP goes into detail on the existing conditions and recommended improvements for each of these intersection projects (see pages 37 through 46 of the LRSP). A summary of what actions have been taken by staff already to address some of these intersection projects includes the following:

• Firestone Boulevard at Lakewood Boulevard (to be completed by the summer of 2025) and Firestone Boulevard at Downey Avenue and Rives Avenue intersection improvements. These two intersection improvements are currently in design. Staff will address the Downey Avenue intersection improvements as part of the Downey Avenue Pavement Rehabilitation Project to be completed by the summer of 2025.

The Rives Avenue intersection improvements would be addressed as a separate project to be completed by the end of 2025.

• Fairford Avenue at Cecilia Street is a shared intersection with the City of Norwalk.

Staff took the lead in completing an analysis of traffic safety issues related to this intersection. Since the majority of the project falls under the jurisdiction of Norwalk, staff shared its findings with their staff, and they recently completed their own

ADOPTION OF RESOLUTIONS CERTIFYING AN UPDATE TO THE CITY’S LOCAL ROAD SAFETY

PLAN AND AUTHORIZING THE SUBMITAL OF APPLICATIONS FOR HIGHWAY SAFETY

IMPROVEMENT PROGRAM FUNDS TO IMPLEMENT VARIOUS TRAFFIC SAFETY PROJECTS AUGUST 27, 2024
PAGE 6

6 analysis and the Norwalk City Council approved a street humps project that will be completed by the summer of 2025. The City will be paying its prorated share of between 40 and 50 percent of the project costs, but Norwalk will be taking the lead on construction.

Corridor Analysis and Recommended Projects
Similarly, corridors in the City were also analyzed for frequency, severity, and type of collisions and were ranked according to weighted value per mile, as shown in the following table:

Looking at the types of collisions and their primary causes, Willdan prepared a list of recommended improvements, as shown in the following table:

ADOPTION OF RESOLUTIONS CERTIFYING AN UPDATE TO THE CITY’S LOCAL ROAD SAFETY

PLAN AND AUTHORIZING THE SUBMITAL OF APPLICATIONS FOR HIGHWAY SAFETY

IMPROVEMENT PROGRAM FUNDS TO IMPLEMENT VARIOUS TRAFFIC SAFETY PROJECTS AUGUST 27, 2024
PAGE 7

7 The LRSP goes into detail on the existing conditions and recommended improvements for each of these corridor projects (see pages 47 through 56 of the LRSP). A summary of what actions have been taken by staff already to address some of these corridor projects includes the following:

• Firestone Boulevard corridor improvements are taking place at three of the prioritized intersections at Lakewood Boulevard, Downey Avenue, and Rives Avenue.

Additionally, the entire corridor is being analyzed for improvements and will be part of an HSIP grant funding application submitted by September 9, 2024 to address traffic signal upgrades at the remaining 12 intersections along this corridor. The project will also look at other improvements that could make the area safer for pedestrians.

• Hall Road is being addressed as part of annual miscellaneous projects that will make sidewalk, curb ramp, median, pavement marking, and stop sign improvements along the corridor between Lakewood Boulevard and Woodruff Avenue. In addition to this

ADOPTION OF RESOLUTIONS CERTIFYING AN UPDATE TO THE CITY’S LOCAL ROAD SAFETY

PLAN AND AUTHORIZING THE SUBMITAL OF APPLICATIONS FOR HIGHWAY SAFETY

IMPROVEMENT PROGRAM FUNDS TO IMPLEMENT VARIOUS TRAFFIC SAFETY PROJECTS AUGUST 27, 2024
PAGE 8

8 work, some median improvements are also being implemented as part development in the area. Overall, improvements along this corridor will start taking place in the spring as part of the City’s Annual Miscellaneous Concrete project.

Many of the other corridor projects on this list have some improvements being addressed as part of future CIP projects in the next two to three years. These include:

Intersection Improvement Projects at Paramount Boulevard and Lakewood Boulevard;

Florence Avenue: Traffic Signal and Curb Ramp Improvements at Downey Avenue and Brookshire Avenue; Intersection Improvement Project at Lakewood Boulevard;

Lakewood Boulevard: Intersection Improvements at Firestone Boulevard (to be completed by summer of 2025), Imperial Highway, and Florence Avenue; Traffic Signal upgrades at Rosecrans Avenue, Gardendale Street, Alameda Street, and Cecilia St/5th Street (this project was recently completed in the summer of 2024); Street and Traffic Signal Improvements on Lakewood Boulevard between Century Boulevard and Gardendale Street;

Downey Avenue (South of Firestone Boulevard): Intersection improvement at Firestone Boulevard (to be completed by summer of 2025);

Cecilia Street: As mentioned previously, a speed hump project shared between the City and Norwalk was recently approved by the Norwalk City Council. This project should be completed by summer of 2025 by the City of Norwalk. it is the lead agency with the City of Downey paying its prorated share of between 40 and 50 percent for the construction costs.

Recommended Projects for HSIP Funding Applications
Municipalities commonly use funding available from the Highway Safety Improvement Program (HSIP) to help fund traffic safety projects. Considering this, another purpose of the LRSP is to analyze and develop the project scopes and cost estimates that would be competitive for HSIP funding using a Benefit-Cost Ratio (BCR) score of at least 20. The project is scored by using safety measures that are outlined by HSIP engineers in the Local Road Safety Manual. The HSIP Analyzer Tool is used to quantify the benefit of a particular safety measure, add up the total quantified benefits for all of the proposed safety measures, and then divide the calculated benefit by the costs to implement the safety measures in order to come up with the BCR score. A BCR score of 20 is what is deemed to be necessary to qualify for HSIP funding in the upcoming Cycle 12. Essentially, this is a tool to help jurisdictions determine how likely they are to be considered for funding under the HSIP program. A list of the seven projects with the potential to receive funding through the HSIP program are listed below:

ADOPTION OF RESOLUTIONS CERTIFYING AN UPDATE TO THE CITY’S LOCAL ROAD SAFETY

PLAN AND AUTHORIZING THE SUBMITAL OF APPLICATIONS FOR HIGHWAY SAFETY

IMPROVEMENT PROGRAM FUNDS TO IMPLEMENT VARIOUS TRAFFIC SAFETY PROJECTS AUGUST 27, 2024
PAGE 9

9 The projects that show “N/A” in the table do not have scores as these are set-aside funds that are available over multiple funding cycles, typically for smaller projects. The City was successful in receiving some of these set-aside funds for pedestrian improvement projects in the last funding cycle.

Next Steps

ADOPTION OF RESOLUTIONS CERTIFYING AN UPDATE TO THE CITY’S LOCAL ROAD SAFETY

PLAN AND AUTHORIZING THE SUBMITAL OF APPLICATIONS FOR HIGHWAY SAFETY

IMPROVEMENT PROGRAM FUNDS TO IMPLEMENT VARIOUS TRAFFIC SAFETY PROJECTS AUGUST 27, 2024
PAGE 10

10 The City has had some success in securing HSIP funds in previous cycles, as previously mentioned. The analyses that were completed by Willdan as part of LRSP 2024 will be used as part of the data-based justifications necessary in the HSIP Cycle 12 funding applications due to Caltrans by September 9, 2024. In order to be competitive under the Cycle 12 application period, staff is seeking adoption of Resolution No. 24-XXXX (Attachment C) by the City Council, which officially recognizes the update commissioned by the City Council and provides the most updated collision data for Caltrans to the City’s application. In addition, staff is seeking adoption of Resolution No. 23-XXXX, which is required for submittal of applications under the HSIP program (Attachment D).

This report highlights the City’s current traffic safety projects that address many of the prioritized projects that are based on the collision data trends in the LRSP 2024. There are other traffic safety projects that might fall just outside of these priorities that are nonetheless important in addressing safety concerns of the community and the City Council. Several such projects that staff is working on or has completed include the following:

• South Downey Safe Routes to School Phase I project that improved sidewalks and curb ramps near Ward Elementary, Carpenter Elementary, Imperial Elementary, Old River Elementary, and Stauffer Middle School.

• Staff was successful in securing a grant from Caltrans under ATP Cycle 6 to create a new project under the Safe Routes to School Project. Phase II of this project is currently in the design phase to provide pedestrian improvements at various locations on the way to the Safe Routes to School Phase I schools mentioned above, as well as Alameda Elementary, Saint Raymond Catholic School, and Sussman Middle School.

• In addition to these school safety projects, staff has begun design of the speed humps along Guatemala Avenue, which was initiated through the City’s Traffic Calming Policy. Staff also completed an analysis of the intersection of Suva Street and Guatemala Avenue. It was determined that a traffic signal is warranted at this intersection and the design phase has begun. It is anticipated that the speed hump project will be completed by June 2025. Design of the traffic signal will be completed by December 2024. The traffic signal project will likely take until the end of 2025 to complete construction, as there are lead times of up to 6 months to order and receive the new traffic signal equipment.

Engineering staff from Public Works also works closely with the Police Department’s traffic safety division as part of its work to conduct traffic studies throughout the City.

These include requesting and reviewing new traffic accident reports to identify recent trends and supplementing existing traffic accident data with any new reports to more fully

ADOPTION OF RESOLUTIONS CERTIFYING AN UPDATE TO THE CITY’S LOCAL ROAD SAFETY

PLAN AND AUTHORIZING THE SUBMITAL OF APPLICATIONS FOR HIGHWAY SAFETY

IMPROVEMENT PROGRAM FUNDS TO IMPLEMENT VARIOUS TRAFFIC SAFETY PROJECTS AUGUST 27, 2024
PAGE 11

11 analyze a specific location. Staff also conducts engineering speed surveys, as required under the California Vehicle Code, to ensure that the posted speed limits on the City’s streets are calculated based on properly collected data so that the Police Department can legally enforce the limits during their patrols. Staff from both departments coordinate closely to ensure that signage and pavement markings are visible to motorists and pedestrians. Enforcement requests from the community that are made to engineering staff are shared with the Police Department so they can increase patrols or deploy mobile enforcement trailers to help reduce speeding. Engineering staff will coordinate with the Police Department to review any new collision or enforcement data on a quarterly basis for the prioritized locations in the LRSP 2024.

Staff will continue to use the information in the LRSP 2024 as it prioritizes traffic safety projects as part of its Capital Improvement Program in order to meet the goal of reducing traffic collisions throughout the City. Caltrans recommends updating the LRSP every four years, so the effort to update the plan in 2024 rather than 2026 demonstrates the City Council’s commitment to continually evaluating traffic safety throughout the City.

CITY COUNCIL PRIORITIES

Quality of Life, Safety & Infrastructure

FISCAL IMPACT

The are no fiscal impacts.

ATTACHMENTS

Attachment A: Local Road Safety Plan Update
Attachment B: Heatmap of traffic collisions in Downey – 2020 through 2023 Attachment C: Resolution No. 24-8265 – Certification of the Updated LRSP Attachment D: Resolution No. 24-8266 – Submittal of Funding Applications for HSIP Cycle 12

City of Downey
Local Roadway Safety Plan(LRSP) Update
July 15, 2024

Page i

Page ii
Forward

The City of Downey’s Local
Roadway Safety Plan (LRSP) has
was developed in April 2022 and
now updated with current crash
data up to 2023 with the same
vision and goal that mirrors the
vision and goal of the California
Strategic Highway Safety Plan as
follows:

A qualitative and quantitative analysis of the collision data between 2020 and 2023 led to the development of the following turn-key HSIP projects which will reduce identified collision trends throughout the roadways and non-State Highways of the City.

Project
Name Project Description Estimate
Firestone Corridor
Traffic Signal
Improvements
Upgrade signal hardware, provide advanced
detection, and implement a leading pedestrian
interval to timing at 15 signalized intersections
on Firestone Blvd
$1,584,000
Pedestrian Crosswalk Upgrade 2 uncontrolled crosswalks with high visibility features $224,000
Systemic Bike Lane
Corridor BCR Project
Install Class II bike lanes with a road diet at 2
corridors on Old River School Road, and
Downey Avenue
$296,920
Systemic Bike Lane
Corridor Set Aside
Project
Install Class II bike lanes with a road diet at 2
corridors on Brookshire Avenue and Foster
Road
$300,280
Systemic Traffic
Signal Improvement
Project
Upgrade signal hardware at 12 intersections
Citywide and Upgrade signal left turn
phasing at 8 intersections Citywide
$2,589,400
Vision
Downey will
have a safe
transportation
system for all
users.

Goal
Downey will
move towards
zero traffic-
related deaths.

Page iii
Project
Name Project Description Estimate
Florence Median
Project
Install raised medians on Florence Avenue
between Vultee Avenue and Woodruff
Avenue
$551,000
Systemic Sidewalk
Project
Install Sidewalks on 3 roadways, convert two
roadways to one way streets and install a
crosswalk at an intersection
$2,408,720

By signing and stamping this Local Roadway Safety Plan, the engineer is attesting to this report’s technical information and engineering data upon which local agency’s recommendations, conclusions, and decisions are made.

WILLDAN

Nicolle Span, P.E., T.E.

Traffic Engineer

REPORTS DISCOVERY AND ADMISSION INTO EVIDENCE OF CERTAIN REPORTS, SURVEYS, AND INFORMATION – Notwithstanding any other provision of law reports, surveys, schedules, lists, or data compiled or collected for any purpose relating to this section, shall not be subject to discovery or admitted into evidence in a Federal or State court proceeding or considered for other purposes in any action for damages arising from any occurrence at a location identified or addressed in the reports, surveys, schedules, lists, or other data.

WILLDAN
13191 Crossroads Pkwy North, Suite 405
Industry, CA 91746
562-908-6200

Page iv
Table of Contents
Downey Heat Map ...................................................................................... i Forward ...................................................................................................... ii Table of Contents ..................................................................................... iv I- Introduction ............................................................................................ 7 Overview of the Process .............................................................................................. 8 Task Force Acknowledgments ..................................................................................... 9 Data Analysis Methodology ....................................................................................... 10 II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety ....................................................................................... 12 Severity Trends.......................................................................................................... 12 Collision Type Trends ................................................................................................ 16 Primary Collision Factor Trends................................................................................. 18 Motor Vehicle Involved with Trends ........................................................................... 20 Pedestrian and Bicycle Trends .................................................................................. 21 Pedestrian Crash Trends ..................................................................................................................... 21 Bicycle Trends ..................................................................................................................................... 24 Crash Trends Near Schools ...................................................................................... 27 Crash Priority Methodology ....................................................................................... 29 Top 10 Intersections .................................................................................................. 30 Top 10 Corridors ........................................................................................................ 32 III- Top Intersection and Corridor Spotlight ........................................... 35 1- Firestone Boulevard at Lakewood Boulevard ........................................................ 37 2- Firestone Boulevard at Downey Avenue ............................................................... 38 3- Florence Avenue at Woodruff Avenue ................................................................... 38 4- Firestone Boulevard at Rives Avenue ................................................................... 40 5- Fairford Avenue at Cecilia Street ........................................................................... 41 6- Telegraph Road at Paramount Boulevard ............................................................. 42 7- Downey Avenue at Imperial Highway .................................................................... 43

Page v
8- Downey Avenue at Gardendale Street .................................................................. 44 9- Paramount Boulevard at Florence Avenue ............................................................ 44 10- Gardendale Street at Paramount Boulevard ........................................................ 46 11- Klondike Avenue between Downey Avenue and Century Boulevard ................... 47 12- Firestone Boulevard between City Limit and City Limit ........................................ 48 13- Hall Road between Lakewood Boulevard and Woodruff Avenue ........................ 49 14- Imperial Highway between Old River School Road and Woodruff Avenue .......... 50 15- Florence Avenue between City Limit and City Limit ............................................. 51 16- Bellflower Boulevard between Stewart & Gray and Dalen Street ........................ 52 17- Vista Del Rio Drive between Clancey Avenue and Eglise Avenue ...................... 53 18- Lakewood Boulevard between City Limit and City Limit ...................................... 54 19- Downey Avenue between Firestone Boulevard and South City Limit .................. 55 20- Cecilia Street between Studebaker Road and Orr & Day Road .......................... 56 IV- Project Scopes ................................................................................... 57 100- Firestone Corridor Traffic Signal Improvements ........................... 60 Overview .................................................................................................................... 60 Existing Conditions .................................................................................................... 63 Project Area Collision Trends .................................................................................... 65 200- Pedestrian Crosswalk Set Aside .................................................... 68 Overview .................................................................................................................... 68 Existing Conditions .................................................................................................... 72 300- Systemic Bike Lane Corridor .......................................................... 73 Overview .................................................................................................................... 73 Existing Conditions .................................................................................................... 78 Project Area Collision Trends .................................................................................... 82 400- Systemic Traffic Signal Improvement Project ............................... 84 Overview .................................................................................................................... 84 Existing Conditions .................................................................................................... 87 Project Area Collision Trends .................................................................................... 91

Page vi
500- Florence Median Project ................................................................. 93 Overview .................................................................................................................... 93 Existing Conditions .................................................................................................... 94 Project Area Collision Trends .................................................................................... 95 600- Sidewalk Install Project .................................................................. 97 Overview .................................................................................................................... 97 Project Area Collision Trends .................................................................................... 98 V- Next Steps ........................................................................................... 99 Appendices ..................................................................................................

Appendix I: Firestone Corridor Traffic Signal Improvements .........................................

Appendix II: Pedestrian Crosswalk Set Aside ................................................................

Appendix III: Systemic Bike Lane Corridor ....................................................................

Appendix IV: Systemic Traffic Signal Improvement Project ...........................................

Appendix V: Florence Median Project ............................................................................

Appendix VI: Task Force Meeting Minutes and Agenda ................................................

Appendix VII: Crash Maps Around Schools ...................................................................

I- Introduction

Page 7 ends

I- Introduction
The Downey LRSP1 provides a conceptual framework to identify, analyze, and prioritize roadway safety improvements on local roads. Particularly, it provides the opportunity to proactively correct high collision or problem locations and prevent local road fatalities and injuries. It establishes goals, objectives, and emphasis areas. Furthermore, it helps identify appropriate funding sources to reach the City’s safety-related visions and goals.

Beginning in 2021, Caltrans2 requires agencies to have completed an LRSP in order to apply for HSIP3 funding which is a common source of safety project support from the State and Federal Government. Fortunately, the City was awarded grant funding to implement this very LRSP. It has been prepared in accordance with all Caltrans and FHWA4 requirements. Additionally, the City has outlined some of its own goals and visions for the LRSP:

Table I-1: Goals & Visions Outlined by Downey
1 Develop a systemic plan to address Citywide collisions 2 Reduce pedestrian collisions at night
3 Study trends and patterns to come up with safety projects and countermeasures
4 Implement bicycle master plan

In 2022, Downey completed its Citywide LRSP. Two years later, in 2024, the LRSP is being re-evaluated using the most recent crash history between 2020 and 2023 to identify new trends and projects.

1 Local Roadway Safety Plan (LRSP) is a data-driven traffic safety plan specifically tailored to a jurisdiction. 2 The California Department of Transportation (Caltrans) 3 Highway Safety Improvement Program (HSIP)
4 Federal Highway Administration (FHWA)

I- Introduction

Page 8 ends

Overview of the Process

The City of Downey has implemented this LRSP as part of the City’s commitment and priority to improving traffic safety for all users throughout the City. The LRSP is a framework for identifying collision trends and recognizing projects and funding sources that can be used to reduce collisions on the local road network. LRSP’s aim is to reduce fatalities on local roads in states and counties that implement them. The City’s LRSP includes the following elements depicted below:

An LRSP is an ongoing document that needs to be periodically updated as collision trends change.

Establish
Task
Force
Analyze
Safety
Data
Determine
Emphasis
Areas
Identify
Projects
Prioritize
and
Incorporate
Projects
Evaluate
and
Update The LRSP
Development
Process

I- Introduction

Page 9 ends

Task Force Acknowledgments

The City of Downey’s LRSP Task Force5 team members include representatives from the 4 E’s6 as a collaborative team to leverage expertise and input into developing the LRSP.

All information shared through virtual collaborative meetings, phone calls, and email was immensely valuable and helped create a deeper understanding of the story behind the data. Detailed meeting agenda and meeting minutes can be found in Appendix VI.

Engineering
Apply effective
and/or innovative
countermeasures

Enforcement
Enforce actions
that reduce high-
risk behaviors
Education
Educate all road
users on safe
behaviors
Emergency
Services
Improve emergency
response times and
actions

City of Downey
Public Works

Community
Development
Department

Downey Police
Department

Downey Unified
School District

Parks & Recreation
Department

Downey Fire
Department

Downey Police
Department

5 A task force is a group of City representatives responsible for overseeing, maintaining, and managing the City’s roadways. They also have a vision in mind for how the community will develop in the future. They consider both the short term and long-term future.
6 Engineering, Enforcement, Education, Emergency Services (4 E’s)

I- Introduction

Page 10 ends

Data Analysis Methodology

7 8

The quantitative analysis is the process of compiling and studying collision records.

SWITRS and TIMS are very common and reliable sources for collision records. Using this data, we can identify which locations have the greatest number of collisions, the most severe collisions, the collisions with the most injuries, and that have a significant number of certain types of collisions. We also specifically examine collision data involving pedestrians and bicyclists to see if any patterns are prevalent. As the d ata is being reviewed, we consider which mitigations, countermeasures, or strategies can be used to reduce the likelihood of certain types of collisions. We are then able to identify types of locations where collisions in the future are likely to occur and sort them into different projects. Each project employs mitigations specific to those locations. As we identify locations, we share our findings with the Task Force.

7 Statewide Integrated Traffic Records System (SWITRS). SWITRS provides crash data from police or sheriff reports with details including date, time of day, location, number of cars, type of crash, lighting conditions, collision factors, injuries, and injury severity. 8 University of California Berkley’s Transportation Injury Mapping System (TIMS). TIMS uses data from SWITRS to generate interactive maps that provide a better perspective where crashes are occurring. TIMS also eliminates non-injury crashes from its data.

4-year crash history data from
January 1, 2020 to December 31,
2023 obtained from SWITRS8 and
TIMS9.

Crash history analyzed to identify
trends:
• Locations with high-frequency
and high-severity crashes
• Bike and pedestrian crash trends
• Trends associated with other
crash types that can be mitigated

Conduct in-
person
location
inspections.

Task Force
makes
recommended
actions.

Quantitative Analysis Qualitative Analysis
Develop Projects using data
gathered from quantitative
and qualitative analysis that
will reduce crash frequency.

I- Introduction

Page 11 ends

In addition to in person field reviews and observations, the qualitative analysis considers existing conditions on the roadways as well as insight and input from the Task Force for identifying other factors that might not be understood from the data. Projects are then refined to emphasize safety and accessibility for all.

Both the quantitative analysis and qualitative analysis are used to develop data -driven safety projects that the Task Force support.

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 12 ends

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety
The 6-year collision data was filtered to include only collisions that took place on roadways maintained and operated by the City. The data was studied to identify locations that had a significant number of collisions, injury collisions, and instances of specific types of collisions. Using SWITRS and TIMS, locations with many collisions, locations with high severity collisions, or both can be difficult to spot when simply studying data. To better locate them, a heat map was developed and can be found on the inside cover of this report. Also, collisions involving bicyclists and pedestrians were isolated to determine if any prevailing patterns could be identified.

Severity Trends

When considering all the data, it is important to identify overall trends. Figure II-1 illustrates the proportion of collisions based on the different severity categories. Severity is a significant consideration when applying for project funding , particularly collisions involving injuries. There were 3,272 collisions reported in Downey between 2020 and Figure II-1: Citywide Collisions by Severity
PDO
40%
INJURY
(COMPLAINT

OF PAIN)
42%

INJURY (OTHER

VISIBLE)
15%
INJURY
(SEVERE)
1%
INJURY
1%FATAL
1%

SEVERITY

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 13 ends

2023. The combined fatal and severe injury collisions made 2% of the total collisions reported, while the collisions without injury made up for 40% of the collisions reported.

A comparison of the total number of fatal and severe injury collisions amongst nearby cities is shown in Figure II-2. This comparison shows that Downey has less fatal and severe injuries than nearby cities of Norwalk, Bellflower, Santa Fe Springs, and Lynwood.

However, Downey has an annual average between 10 -28 fatal and severe injury collisions per year.

Figure II-2: Total Number of Fatality and Severe Injury Collisions Comparison of Nearby Cities

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 14 ends

Comparative to the fatal and severe injury collision map, Figure II-3 shows the total number of fatal and all types of injury collisions compared with nearby cities. Downy is amongst the Cities with the highest amount of collisions with Bell Gardens, Pico Rivera, Cudahy, and Paramount having less collisions than Downey.

Figure II-3: Total Number of Injury Collisions Comparison with Nearby Cities

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 15 ends

Figure II-4: Fatal and Severe Injury Crash Locations

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 16 ends

Figure II-5: Citywide Collisions by Type
Collision Type Trends

Collisions were also studied based on the different collision types. Figure II-5 demonstrates that broadside, rear end, and sideswipe collisions were the most common and accounted for 73% of the reported collisions. The collision type breakdown allows for a further understanding of emerging trends in the overall data. Table II-1 describes appropriate mitigations for the top 3 most common types of collisions as well as pedestrian and bicycle collisions.

HIT OBJECT
15%OTHER
2%

SIDESWIPE
18%

REAR END
24%

BROADSIDE
31%

AUTO/PED
4%

HEAD-ON
4%

OVERTURNED
1%

COLLISION
TYPE

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 17 ends

Table II-1: Mitigations based on Collision Type

Collision
Type Mitigations
Broadside
- Install raised medians
- Upgrade signal hardware
- Provide protected left turn phase
- Convert signal to mast arm (from pedestal-mounted)
- Install signals
- Provide advanced dilemma zone detection
- Add segment lighting
- Install/upgrade larger stop signs
- Install flashing beacons at Stop-controlled intersections Rear End
- Upgrade signal hardware
- Provide advanced dilemma zone detection
- Provide protected left turn phase
- Convert signal to mast arm (from pedestal-mounted)
- Add two-way left-turn lanes
- Install flashing beacons as advance warning
- Install/upgrade high visibility warning signs
- Install/upgrade larger stop signs
- Upgrade intersection pavement markings
- Install flashing beacons at Stop-controlled intersections - Add segment lighting
- Install acceleration/ deceleration lanes
- Install a road diet (lane reduction)
Sideswipe
- Install raised medians
- Provide protected left turn phase
- Install acceleration/ deceleration lanes
- Add two-way left-turn lanes

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 18 ends

Primary Collision Factor Trends

The data was also organized to consider the primary collision factor, Figure II-6. The primary collision factor is different than collision type. Collision type describes the physical manner of the collision and primary collision factor describes what led to the collision.

Table II-2 describes appropriate mitigations for the top three primary collision factors which account for 56% of the collisions.

21%
2%
15%
6%
15%
20%
1%
1%
1%
2%
16%
Improper Turning
Unsafe Starting Or Backing
Unsafe Speed
Traffic Signals and Signs
DUI
Automobile Right Of Way
Unsafe Lane Change
Wrong Side Of Road
Following Too Closely
Pedestrian Violation/ Right of Way
Other/ Not Stated

PRIMARY COLLISION FACTOR
Figure II-6: Citywide Primary Collision Factors

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 19 ends

Table II-2: Mitigations Based on Primary Collision Factor

Primary Collision Factor Mitigations
Unsafe
Speed
- Speed limit enforcement
- Upgrade signal hardware
- Provide advanced dilemma zone detection
- Install left-turn lane and turn phase
- Install raised median
Improper
Turning
- Upgrade signal hardware
- Install left-turn lane and turn phase
- Install raised median
Automobile Right of
Way
- Upgrade signal hardware
- Provide protected left turn phase
- Convert signal to mast arm (from pedestal-mounted)
- Install signals
- Install/upgrade larger stop signs
- Install flashing beacons at Stop-controlled intersections DUI - Increased Enforcement & DUI Checkpoints
- Increased Education

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 20 ends

Motor Vehicle Involved with Trends

The overall collision data was organized based on what the motor vehicle was involved with in the collision, shown in Figure II-7. The top categories are other motor vehicles, parked motor vehicle, and fixed object. While 61% of collisions occurred between at least two moving motor vehicles, 7% of collisions involved a pedestrian or bicyclist.

Fixed Object
14%
Parked
Motor
Vehicle
16%
Other Motor
Vehicle
61%
Pedestrian
4%
Bicycle
3%
Other
2%

MOTOR VEHICLE

INVOVED WITH
Figure II-7: Citywide Collisions by Motor Vehicle Involved With

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 21 ends

Pedestrian and Bicycle Trends

Reviewing trends involving pedestrians and bicyclists is pertinent to reach the City’s goal of zero traffic-related deaths. Although pedestrian and bicycle related crashes only take 7% of the City’s crashes, they should be considered a priority as crashes involving pedestrians and bicyclists are more likely to result in fatal or severe injury collisions than crashes only involving motorized vehicles. Figure II-8 shows the severity of pedestrians and bicycle collisions compared to all other collision types, showing if a pedestrian is involved in a crash, it is much more likely to result in a fatality or severe injury.

Pedestrian Crash Trends

Between 2020 and 2023, there were 138 pedestrian crashes in the City of Downey, with 12% of the crashes resulting in a fatality or severe injury, as displayed in Figure II-8. All injury collisions involving pedestrians are shown in the map in Figure II-9. A complete table of the crashes involving pedestrians is found in Appendix X.

Figure II-8: Severity of Crashes of Pedestrians, Bicycles, and All Other Parties 1%12%2%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
All Other Crashes Pedestrian Crashes Bicycle Crashes
Severity of Crashes of Pedestrians, Bicycles, and All Other Parties Fatal or Severe Injury Crashes All Other Crashes

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 22 ends

Figure II-9: Pedestrian Crash Location Heatmap

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 23 ends

Crashes involving pedestrians mostly were due to pedestrian right of way violations and other pedestrian violations, both putting the pedestrian at fault in the police reports. In Downey 55% of crashes were due to these two violations, faulting pedestrians . The breakdown of primary collision factors is shown in Figure II-10. Table II-3 describes appropriate mitigations for the pedestrian-related crashes.

Figure II-10: Pedestrian Crash Primary Collision Factors Table II-3: Pedestrian Crash Mitigation Measures
Crash Location Mitigation Measure
Signalized Intersection - Education
- Enforcement
- Install Raised Medians/ Refuge Islands
- Install Pedestrian Countdown Signal Heads
- Install advance stop bar before crosswalk
- Modify signal phasing to implement a Leading
Pedestrian Interval (LPI)
Non-Signalized
Intersection
- Education
- Enforcement
- Install Rectangular Rapid Flashing Beacons
- Upgrade pedestrian Crossing with Enhanced
Safety Features
- Install Pedestrian Signal
Signs and Signals
6%
Driver Fault
16%
Pedestrian Violation
or Pedestrian Right
of Way
55%
Other/ Not
Stated
23%

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 24 ends

Crash Location Mitigation Measure
Midblock - Education
- Enforcement
- Install Rectangular Rapid Flashing Beacons
- Upgrade pedestrian Crossing with Enhanced
Safety Features
- Install Pedestrian Signal
- Install Sidewalk/ Pathway to avoid walking along
roadway

Bicycle Trends

Between 2020 and 2023, there were 104 bicycle crashes in the City of Downey, with 2% of the crashes resulting in a fatality or severe injury, as displayed in Figure II-8. All injury collisions involving bicyclists are shown in the map in Figure II-11.

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 25 ends

Figure II-11: Bicycle Crash Location Heatmap

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 26 ends

Crashes involving bicyclists mostly were due to automobile right of way violations, and bicyclists driving on the wrong side of the road. The breakdown of primary collision factors is shown in Figure II-10. Table II-4 describes appropriate mitigations for the bicycle- related crashes.

Figure II-12: Bicycle Crash Primary Collision Factors
Table II-4: Bicycle Crash Mitigation Measures
Crash Location Mitigation Measure
Signalized Intersection - Education
- Enforcement
- Install bicycle box before crosswalk
- Modify signal phasing to implement a Leading
Pedestrian Interval (LPI)
Non-Signalized
Intersection
- Education
- Enforcement
Midblock - Education
- Enforcement
- Install separated bike lanes

Traffic Signals
and Signs
Wrong Side Of
Road
Automobile
Right Of Way
Improper
Turning
Unknown
Ped Vio
Other Hazard Unsafe Speed Improper Passing

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 27 ends

Crash Trends Near Schools

Reviewing crash trends that occurred near schools may result in different mitigation measures than crashes not around schools. A map of the school locations over the city - wide heat map is shown in Figure II-11. A map of crashes within 500-feet of each school location can be found in Appendix VII.

Figure II-12: Map of Crashes Near Schools

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 28 ends

Figure II-13 shows the percentage of pedestrian or bicycle crashes within 500-feet of all schools in Downey. While 90% of collisions occurred between at least two moving motor vehicles, 10% of collisions involved a pedestrian or bicyclist. Compared with Figure II-7 identifying City-wide crashes earlier in this section, crashes closer to schools are more likely to involve pedestrians or bicyclists. Table II-5 describes appropriate mitigations for crashes near schools.

Figure II-13: Percentage of Pedestrian or Bicycle Crashes Near Schools

Table II-5: Crashes in School Zone Mitigation Measures
Crash Location Mitigation Measure
Crosswalks - Education
- Enforcement
- Install Rectangular Rapid Flashing Beacons
- Upgrade pedestrian crossing with enhanced Safety
features
- Install pedestrian signal
- Install Raised Medians/ Refuge Islands
- Install Pedestrian Countdown Signal Heads
- Install advance stop bar before crosswalk
- Modify signal phasing to implement a Leading
Pedestrian Interval (LPI)
- Employ crossing guards during school start and
release times
vehicle 90%
bicycle 4%
pedestrian 6%

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 29 ends

Crash Location Mitigation Measure
Midblock - Education
- Enforcement
- Install Rectangular Rapid Flashing Beacons
- Upgrade pedestrian crossing with enhanced Safety
features
- Install Pedestrian Signal
- Install sidewalk/ pathway to avoid walking along
roadway

Crash Priority Methodology

Building on the overall collision analysis for 2020-2023, specific locations were studied.

The top intersections considered were based on the following metrics:
• Intersection collisions include those occurring either at or within 250 feet of the intersection.
• Intersections were sorted by the sum of the weighted collision severity. Weighted crash severity is a value assigned based on the crash severity. The values shown in Table II-6 are assigned for each type of crash severity. These crash severity weighted values were based on the HSIP analyzer to identify the project benefit.

A high weighted collision severity coupled with the low number of collisions indicates that the collision is more likely to be severe or fatal.

Table II-6: Weighted Crash Severity Values
Property
Damage Only
Complaint of
Pain Other Injury Severe Injury Fatal
1 6 11 126 126

• Intersection locations where collisions have been recently mitigated with infrastructure projects were removed from this analysis and are not included in the top intersections list. This includes locations that have had projects funded by past HSIP calls for projects.

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 30 ends

Top 10 Intersections

Table II-7 lists the top 10 intersections with the highest weighted severity based on the metrics listed above. A deeper look into each location and possible mitigations can be found in Section III- Top Intersection and Corridor Spotlight.

Every intersection in the top 10 intersections with the highest weighted severity has a trend of mostly broadside collisions. Common primary collision factors that occurred at these intersections are automobile right of way violations, unsafe speeding and improper turning. These trends are consistent with the Citywide trends identified earlier in the report.

Table II-7: Top 10 Intersections with the Highest Weighted Collision Severity

INTERSECTION
NUMBER
OF

COLLISIONS

WEIGHTED

VALUE COLLISION TYPES PRIMARY COLLISION

FACTORS
Firestone Boulevard
& Lakewood
Boulevard
98 513 Broadside 43% Auto ROW 36%
Downey Avenue &
Firestone Boulevard 37 377 Rear End 41%,
Broadside 30% Auto ROW 22%
Florence Avenue &
Woodruff Avenue 15 335 Broadside 60%,
Rear End 27%
Auto ROW 47%,
Unsafe Speed 33%
Firestone Boulevard
& Rives Avenue 28 258
Broadside 32%,
Sideswipe 25%,
Hit Object 21%
Auto ROW 25%,
Improper Turning 25%
Fairford Avenue &
Cecilia Street 2 252 Ped 50%,
Broadside 50%
Pedestrian Violation
50%, DUI 50%
Telegraph Road &
Paramount
Boulevard
22 242 Broadside 41%,
Rear End 23% Improper Turning 27%
Downey Avenue &
Imperial Highway 15 220 Broadside 58% Auto ROW 53%
Downey Avenue &
Gardendale Street 14 214 Broadside 86% Auto ROW 50%,
Signal 21%
Paramount Avenue
& Florence Avenue 42 202 Rear End 33%,
Broadside 21%
Improper Turning 24%,
Unsafe Speed 21%
Gardendale Street &
Paramount
Boulevard
11 201 Broadside 40%,
Rear End 30%
Auto ROW 40%,
Unsafe Speed 30%

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 31 ends

Figure II-14: Citywide Heatmap of Collisions with the top 10 intersections and corridors identified.

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 32 ends

Top 10 Corridors

Table II-8 lists the collisions with the highest weighted severity occurring along corridors within the City. Corridors are defined as single stretches of roadways between major intersections. The collisions considered occurred outside of any intersection. These corridors were sorted by the sum of the weighted collision severity. The high weighted collision severity coupled with the low number of collisions indicates that the injury is more likely to be severe or fatal.

Common collision types that occur along these corridors are rear end and hit object.

Common primary collision factors that occurred at these corridors are unsafe speed and improper turning.

II- High Priority Area/ Challenge Areas: Intersections/ Corridors, and Ped/Bike Safety

Page 33 ends

Table II-8: Top 10 Corridors with Highest Weighted Collision Severity Primary Road Segment
Number
of
Collisions
Weighted
Value
Segment
Length
Weighted
Value/Mile Collision Types
Primary Collision
Factors
Klondike Avenue Downey Avenue to Century
Boulevard 2 127 0.14 907.14 50% Ped 50% Ped Violation
Firestone Boulevard City Limit to City Limit 233 1447 3.25 445.23 34% Rear End, 23% Hit Object
27% Improper Turning,
21% Unsafe Speed
Hall Road Lakewood Boulevard to
Woodruff Avenue 5 260 0.6 433.33 40% Hit Object 40% Unknown Imperial Highway Old River School Road to
Woodruff Avenue 134 1165 2.79 417.56 36% Rear End,
27% Hit Object
27% Improper Turning,
25% Unsafe Speed
Florence Avenue City Limit to City Limit 153 1045 3.43 304.66 36% Rear End, 23% Broadside
26% Unsafe Speed,
23% Improper Turning
Bellflower Boulevard Stewart & Gray to Dalen
Street 27 252 0.88 286.36 41% Rear End,
30% Hit Object 37% Unsafe Speed
Vista Del Rio Drive Clancey Avenue to Eglise
Avenue 1 126 0.46 273.91 100% Pedestrian 100% Hazardous Parking
Lakewood Boulevard City Limit to City Limit 201 1048 3.94 265.99 41% Rear End, 24% Hit Object
31% Unsafe Speed,
25% Improper Turning
Downey Avenue Firestone to South City Limit 72 518 2 259.00 32% Rear End, 29% Sideswipe
26% DUI, 25%
Improper Turning
Cecilia Street Studebaker Road to Orr and
Day Road 3 128 0.5 256.00 33% Pedestrian 33% Pedestrian Violation

III- Top Intersection and Corridor Spotlight

Page 34 ends

Figure II-15: Citywide Heatmap of Collisions with the top 10 intersections and corridors identified.

III- Top Intersection and Corridor Spotlight

Page 35 ends

III- Top Intersection and Corridor Spotlight
This section takes a closer look at each of the top 10 intersections and top 10 corridors identified in the previous section. Further trends and potential improvements are identified for each intersection and corridor from the top 10 intersection list and the top 10 corridor list.

Table III-1 Top Intersection Recommended Improvements
INTERSECTION Complete Streets Intersection Improvements Left Turn Phasing Signing and Striping Improvements LPI(Signal Timing) High Visibility Stop Signs Install High-Visibility Crosswalk Upgrade Signal Hardware Firestone Boulevard & Lakewood Boulevard X Downey Avenue & Firestone Boulevard X X
Woodruff & Florence X X X
Rives Avenue & Firestone Boulevard X X
Fairford Avenue & Cecilia Street X X
Telegraph & Paramount Boulevard X X X
Downey Avenue & Imperial Highway
Gardendale & Downey X
Paramount & Florence
Gardendale & Paramount X X

III- Top Intersection and Corridor Spotlight

Page 36 ends

Table III-2 Top Corridor Recommended Improvements
Segment Install Sidewalks Convert Road to One-Way Street Road Diet Install Centerline Traffic Calming Analysis Median Pedestrian Fence Increase Enforcement Signing and Striping Improvements Install Raised Median Install High-Visibility Crosswalk Install Bike Lanes Klondike Avenue
Downey Avenue to Century
Boulevard X X X X
Firestone
Boulevard City Limit to City Limit X X
Hall Road Lakewood Boulevard to
Woodruff Avenue
X X X
Imperial
Highway
Old River School Road to
Woodruff Avenue
X X
Florence
Avenue City Limit to City Limit X
Bellflower
Boulevard Stewart & Gray to Dalen Street X X
Vista Del Rio
Drive
Clancey Avenue to Eglise
Avenue X X X
Lakewood
Boulevard City Limit to City Limit X X
Downey
Avenue Firestone to South City Limit X X X X
Cecilia Street Studebaker Road to Orr and
Day Road

X X X X

III- Top Intersection and Corridor Spotlight

Page 37 ends

1- Firestone Boulevard at Lakewood Boulevard

The signalized intersection of Firestone Boulevard at Lakewood Boulevard has the highest weighted collision rate of any intersection in the City of Downey with 98 collisions occurring in a 4-year study period, with no collisions resulting in severe injuries or fatalities. 43% (42) of the collisions were broadside collisions. 2 of the collisions involved northbound (on Lakewood Boulevard) left turning movements in a 13-month period between 1/6/2021 and 1/21/2022. In 2021, there were 8 collisions involving Northbound left-turning vehicles.

Existing Conditions
Figure III-1 illustrates the intersection of Firestone Boulevard at Lakewood Boulevard.

The following list identifies the existing condition of the intersection. • The traffic signal hardware is currently in good condition • Lakewood Boulevard has protected-permissive traffic signal phasing

Figure III-1: The signalized intersection of Firestone Boulevard at Lakewood Boulevard

Recommended Improvements
• Conduct a traffic study to identify if protected left turn phasing on Lakewood Boulevard is appropriate. Based on crashes, the northbound left turn warrants a protected left turn phase.

III- Top Intersection and Corridor Spotlight

Page 38 ends

2- Firestone Boulevard at Downey Avenue

The signalized intersection of Firestone Boulevard at Downey Avenue has the second highest weighted collision rate in the City of Downey with 37 collisions occurring in a 4- year study period, 2 resulting in severe injuries. The 2 severe injury crashes involved unsafe speeding and a bicyclist. 30% (11) of the collisions were broadside collisions with only one of the collisions involving northbound (on Downey Avenue) left turning movements. 11% (4) of the collisions involved bicycles.

Existing Conditions
Figure III-2 illustrates the intersection of Firestone Boulevard at Downey Avenue. The following list identifies the existing condition of the intersection. • The traffic signal hardware is currently in good condition • All approaches to the intersection have protected -permissive traffic signal phasing

Figure III-2: The signalized intersection of Firestone Boulevard at Downey Avenue Recommended Improvements
• Conduct a traffic study to identify if protected or protected-permissive left turn phasing on all approaches is appropriate. Based on crashes alone, the warrant is not met.
• Complete Streets Bicycle Improvements.

III- Top Intersection and Corridor Spotlight

Page 39 ends

3- Florence Avenue at Woodruff Avenue

The signalized intersection of Florence Avenue at Woodruff Avenue has the third highest weighted collision rate in the City of Downey with 15 collisions occurring in a 4 -year study period, 2 resulting in fatalities. The 2 fatal crashes involved unsafe speeding and automobile right of way. 60% (9) of the collisions were broadside collisio ns no collisions involving left turning movements. No collisions involved pedestrians while one of the collisions involved a bicycle.

Existing Conditions
Figure III-3 illustrates the intersection of Florence Avenue at Woodruff Avenue. The following list identifies the existing condition of the intersection. • The traffic signal hardware is currently in good condition • The school crosswalk striping is faded
• A crossing guard helps students cross the intersection during school start and release times
• Florence Avenue has protected-permissive traffic signal phasing

Figure III-3: The signalized intersection of Florence Avenue at Woodruff Avenue

Recommended Improvements
• Improve intersection striping and signage.
• Upgrade Signal Timing to Implement a Leading Pedestrian Interval (LPI) • Conduct a traffic study to identify if protected or protected -permissive left turn phasing on all approaches is appropriate. Based on crashes alone, the warrant is not met.

III- Top Intersection and Corridor Spotlight

Page 40 ends

4- Firestone Boulevard at Rives Avenue

The signalized intersection of Firestone Boulevard at Rives Avenue has 28 collisions occurring in a 4-year study period, 1 resulting in a fatality. 32% of the collisions were broadside collisions with 7% (2) of the collisions involving pedestrians.

Existing Conditions
Figure III-4 illustrates the intersection of Firestone Boulevard at Rives Avenue. The following list identifies the existing condition of the intersection. • The traffic signal hardware is currently in good condition • All approaches have protected-permissive traffic signal phasing

Figure III-4: The intersection of Firestone Boulevard at Rives Avenue

Recommended Improvements
• Conduct a traffic study to identify if protected left turn phasing on Firestone Boulevard is appropriate. Based on crashes alone, the warrant is not met. • Upgrade Signal Timing to Implement a Leading Pedestrian Interval (LPI)

III- Top Intersection and Corridor Spotlight

Page 41 ends

5- Fairford Avenue at Cecilia Street

The intersection of Fairford Avenue at Cecilia Street is stop controlled in all intersection approaches. There were 2 collisions occurring in a 4-year study period, both resulting in severe injuries. One collision involved a pedestrian crossing Cecilia Street just east of the intersection and the other was a DUI related broadside collision.

Existing Conditions
Figure III-4 illustrates the intersection of Fairford Avenue at Cecilia Street. The following list identifies the existing condition of the intersection. • No crosswalk across any of the approaches at the intersection with a posted speed limit of 25 mph.
• 3 of the 4 stop signs are mounted on a high-visibility red post. • The intersection is shared with the City of Norwalk.

Figure III-5: The signalized intersection of Fairford Avenue at Cecilia Street

Recommended Improvements
• Upgrade stop signs to higher visibility stop signs
• Install red post on stop sign on south-west corner of the intersection • Install high visibility crosswalks at the intersection

III- Top Intersection and Corridor Spotlight

Page 42 ends

6- Telegraph Road at Paramount Boulevard

The signalized intersection of Telegraph Road at Paramount Boulevard has 22 collisions occurring in a 4-year study period, 1 resulting in a severe injury. 41% (9) of the collisions were broadside collisions, and 10% (2) involved pedestrians or bicyclists.

Existing Conditions
Figure III-6 illustrates the intersection of Telegraph Road at Paramount Boulevard. The following list identifies the existing condition of the intersection. • The traffic signal hardware is currently in good condition. • All approaches have protected-permissive traffic signal phasing

Figure III-6: The signalized intersection of Telegraph Road at Paramount Boulevard

Recommended Improvements
• Conduct a traffic study to identify if protected left turn phasing on Paramount Boulevard is appropriate. Based on crashes alone, the warrant is not met. • Fix the direction of the stop sign on the North corner of the intersection so it points to the frontage road, north of Telegraph Road
• Upgrade Signal Timing to Implement a Leading Pedestrian Interval (LPI)

III- Top Intersection and Corridor Spotlight

Page 43 ends

7- Downey Avenue at Imperial Highway

The signalized intersection of Downey Avenue at Imperial Highway has 15 collisions occurring in a 4-year study period, 1 resulting in a fatality. 53% (8) of the collisions were broadside collisions.

Existing Conditions
Figure III-7 illustrates the intersection of Downey Avenue at Imperial Highway. The following list identifies the existing condition of the intersection. • The traffic signal hardware is currently in good condition. • The East-West approaches on Imperial Highway have protected left turn signal phasing while the North-South approaches on Downey Avenue have split phasing.

Figure III-7: The intersection of Downey Avenue at Imperial Highway Recommended Improvements:
• Conduct a traffic study to identify if there are any traffic operational mitigations at the intersection.

III- Top Intersection and Corridor Spotlight

Page 44 ends

8- Downey Avenue at Gardendale Street

The signalized intersection of Downey Avenue at Gardendale Street has 14 collisions occurring in a 4-year study period, 1 resulting in a severe injury. 86% of the collisions were broadside collisions.

Existing Conditions
Figure III-8 illustrates the intersection of Downey Avenue at Gardendale Street. The following list identifies the existing condition of the intersection. • The traffic signal hardware is currently in good condition. • All approaches to the intersection have permissive left turn signal phasing • This intersection is shared with the City of Paramount

Figure III-8: The intersection of Downey Avenue at Gardendale Street Recommended Improvements
• Conduct a traffic study to identify if protected or protected-permissive left turn phasing is appropriate. Based on crashes alone, the warrant is not met. •

III- Top Intersection and Corridor Spotlight

Page 45 ends

9- Paramount Boulevard at Florence Avenue

The signalized intersection of Paramount Boulevard at Florence Avenue has 42 collisions occurring in a 4-year study period, with none resulting in a severe injury or fatality. 33% of the collisions were rear-end collisions and 21% were broadside collisions . 24% of the collisions were due to improper turning and 21% of the collisions were due to improper speeding. 10% (4) of the collisions involved pedestrians or bicycles.

Existing Conditions
Figure III-9 illustrates the intersection of Paramount Boulevard at Florence Avenue. The following list identifies the existing condition of the intersection. • The traffic signal hardware is currently in good condition. • All approaches to the intersection have protected left turn phasing

Figure III-9: The intersection of Paramount Boulevard at Florence Avenue

Recommended Improvements
• Conduct a traffic study to identify if there are any traffic operational mitigations at the intersection.

III- Top Intersection and Corridor Spotlight

Page 46 ends

10- Gardendale Street at Paramount Boulevard

The signalized intersection of Gardendale Street at Paramount Boulevard has 11 collisions occurring in a 4-year study period, with 1 resulting in a fatality. 40% (4) of the collisions were broadside collisions, while 30% (3) of the collisions were rear end collisions.

Existing Conditions
Figure III-10 illustrates the intersection of Gardendale Street at Paramount Boulevard.

The following list identifies the existing condition of the intersection. • The signal hardware, specifically the signal heads are not up to current standards • All approaches have permissive left turn phasing.

Figure III-10: The intersection of Gardendale Street and Paramount Boulevard

Recommended Improvements
• Conduct a traffic study to identify if protected left turn phasing is appropriate.

Based on crashes alone, the warrant is not met.
• Upgrade the signal hardware to current standards

III- Top Intersection and Corridor Spotlight

Page 47 ends

11- Klondike Avenue between Downey Avenue and Century Boulevard

The corridor of Klondike Avenue between Downey Avenue and Century Boulevard is 0.14 miles long. There were 2 collisions occurring in a 4-year study period, 1 resulting in a severe injury. The severe injury collision involved a pedestrian.

Existing Conditions
The corridor of Klondike Avenue between Downey Avenue and Century Boulevard is a 2-lane local residential roadway with residential driveways and parking on both sides of the street. The prima facie speed limit is 25 mph and the roadway is 34 -feet wide. There are no sidewalks on either side of the road. Figure III-11 illustrates the corridor.

Figure III-11: Klondike Avenue between Downey Avenue and Century Boulevard Corridor

Recommended Improvements
• Install sidewalks along the roadway.
o Option 1- Make Bixler Avenue and Klondike Avenue one-way streets to allow the space required to keep parking on the roadway and allow for sidewalks.
o Option 2- Remove parking from one side of the roadway • Install centerline N

III- Top Intersection and Corridor Spotlight

Page 48 ends

12- Firestone Boulevard between City Limit and City Limit

The corridor of Firestone Boulevard is 3.25 miles long. There were 233 collisions occurring in a 4-year study period, 2 resulting in fatalities and 1 resulting in a severe injury.

All three of the severe injury/ fatality collisions involved pedestrians. 9% (20) of the collisions involved pedestrians and bicyclists.27% of the collisions were due to improper turning while 21% of the collisions were due to unsafe speeding.

Existing Conditions
The corridor of Firestone Boulevard is a 6-lane arterial roadway with a raised median separating the directions of travel. Figure III-12 illustrates the corridor.

Figure III-12: Firestone Boulevard Corridor

Recommended Improvements
• Perform further traffic evaluation for traffic calming along the corridor • Install pedestrian fences on the raised medians

III- Top Intersection and Corridor Spotlight

Page 49 ends

13- Hall Road between Lakewood Boulevard and Woodruff Avenue

The corridor of Hall Road between Lakewood Boulevard and Woodruff Avenue is 0.6 miles long. There were 5 collisions occurring in a 4-year study period, 2 resulting in fatalities. One of the fatal collisions was due to unsafe speeding and the other was near an intersection (Adenmoor Avenue).

Existing Conditions
The corridor of Hall Road between Lakewood Boulevard and Woodruff Avenue is a 2- lane residential roadway with several driveways on both sides of the road. There are sidewalk gaps throughout the corridor. Figure III-13 shows faded striping and obstructed signs on the corridor.

Figure III-13: Hall Road between Lakewood Boulevard and Woodruff Avenue Corridor

Recommended Improvements
• Perform further traffic evaluation for traffic calming along the corridor • Increased enforcement of speeding
• Refresh signing and striping along corridor as well as trimming landscaping that are obstructing line of sight and signs.

III- Top Intersection and Corridor Spotlight

Page 50 ends

14- Imperial Highway between Old River School Road and Woodruff Avenue

The corridor of Imperial Highway between Old River School Road and Woodruff Avenue is 2.79 miles long. There were 134 collisions occurring in a 4-year study period, 3 resulting in fatalities and 2 resulting in a severe injuries. Among the 5 fatal and severe injury collisions, 3 involved pedestrians and 2 involved unsafe speeding hitting a fixed object.

Of the 134 collisions, 7% (9) involved pedestrians and bicyclists, 36% were rear end collisions, 27% were hit-object collisions, 25% were due to unsafe speed, and 27% were due to improper turning.

Existing Conditions
The corridor of Imperial Highway between Old River School Road and Woodruff Avenue is a 6-lane arterial roadway with raised medians separating the directions of travel. Figure III-14 illustrates the corridor.

Figure III-14: Imperial Highway between Old River School Road and Woodruff Avenue Corridor

Recommended Improvements
• Perform further traffic evaluation for traffic calming along the corridor. • Install pedestrian fences on the raised medians.

III- Top Intersection and Corridor Spotlight

Page 51 ends

15- Florence Avenue between City Limit and City Limit

The corridor of Florence Avenue is 3.43 miles long. There were 153 collisions occurring in a 4-year study period, 2 resulting in fatalities. Both fatalities were due to unsafe speed. 26% (41) of the collisions were due to unsafe speed and 23% (36) of the collisions were due to improper turning. 7% (11) of the collisions involved pedestrians and bicyclists.

Existing Conditions
The corridor of Florence Avenue is a 6-lane arterial roadway with a 40 mph speed limit.

There are two-way-left-turn-lanes along the corridor separating the directions of travel and allowing for cars to turn left into driveways along the corridor. Figure III-15 illustrates the corridor.

Figure III-15: Florence Avenue Corridor

Recommended Improvements
• Install a raised median, replacing the two-way-left-turn-lanes along the corridor

III- Top Intersection and Corridor Spotlight

Page 52 ends

16- Bellflower Boulevard between Stewart & Gray and Dalen Street

The corridor of Bellflower Boulevard between Stewart & Gray and Dalen Street is 0.88 miles long. There were 27 collisions occurring in a 4-year study period, 1 resulting in a severe injury. The severe injury collision involved a pedestrian. Of the 27 collisions, 37% were due to unsafe speed and 7% (2) involved pedestrians.

Existing Conditions
The corridor of Imperial Highway between Bellflower Boulevard between Stewart & Gray and Dalen Street a 4-lane roadway with raised medians separating the directions of travel.

Figure III-16 illustrates the corridor.

Figure III-16: Bellflower Boulevard between Stewart & Gray and Dalen Street Corridor

Recommended Improvements
• Perform further traffic evaluation for traffic calming along the corridor. • Install pedestrian fences on the raised medians.

III- Top Intersection and Corridor Spotlight

Page 53 ends

17- Vista Del Rio Drive between Clancey Avenue and Eglise Avenue

The corridor of Vista Del Rio Drive between Clancey Avenue and Eglise Avenue is 0.46 miles long. There was 1 fatal collision occurring in a 2021 involving a pedestrian.

Existing Conditions
The corridor of Vista Del Rio Drive between Clancey Avenue and Eglise Avenue is a 2- lane residential roadway with several driveways on the south side of the road. There are no sidewalks on either side of the corridor and there is a pedestrian bridge that spits out on Vista Del Rio Drive crossing the I-5 Freeway. Figure III-17 illustrates the corridor.

Figure III-17: Vista Del Rio Drive between Clancey Avenue and Eglise Avenue Corridor

Recommended Improvements
• Install a sidewalk on the South side of the roadway.
• Install a high-visibility crosswalk at the intersection of Vista Del Rio Drive and Lemoran Avenue/ the pedestrian bridge.
• Install centerline

III- Top Intersection and Corridor Spotlight

Page 54 ends

18- Lakewood Boulevard between City Limit and City Limit

The corridor of Lakewood Boulevard is 3.94 miles long. There were 201 collisions occurring in a 4-year study period, 1 resulting in a fatality. The fatality occurred at night due to unsafe speed. Of the 201 collisions, 4% (9) involved pedestrians and bicyclists, 31% were due to unsafe speed, and 25% were due to improper turning.

Existing Conditions
The corridor of Lakewood Boulevard is a 6-lane arterial roadway with raised medians separating the directions of travel. Figure III-18 illustrates the corridor.

Figure III-18: Lakewood Boulevard Corridor

Recommended Improvements
• Perform further traffic evaluation for traffic calming along the corridor. • Install pedestrian fences on the raised medians.

III- Top Intersection and Corridor Spotlight

Page 55 ends

19- Downey Avenue between Firestone Boulevard and South City Limit

The corridor of Downey Avenue between Firestone Boulevard and South City Limit is 2.0 miles long. There were 72 collisions occurring in a 4-year study period, 1 resulting in a fatality and 1 resulting in a severe injury. The fatal crash involved a pedestrian, and the severe injury collision was due to unsafe speeding. 26 % of the collisions were due to DUIs and 25% of the collisions were due to improper turning.

Existing Conditions
The corridor of Downey Avenue between Firestone Boulevard and South City Limit is a 4-lane roadway in a residential zone, with many driveways fronting the roadway and parking allowed on both sides of the street. Figure III-19 illustrates the corridor.

Figure III-19: Downey Avenue between Firestone Boulevard and South City Limit Corridor

Recommended Improvements
• Install a bike lane with a road diet (Class II), per the Downey Bicycle Master Plan
o Reduce the number of lanes to one lane in each direction, with a two- way-left-turn lane in the center of the roadway, and installing bike lanes on either side of the roadway while keeping parking on both sides of the street.
• Perform further traffic evaluation for traffic calming along the corridor. • Increase enforcement checking for drivers driving under the influence.

III- Top Intersection and Corridor Spotlight

Page 56 ends

20- Cecilia Street between Studebaker Road and Orr & Day Road

The corridor of Cecilia Street between Studebaker Road and Orr & Day Road is 0.5 miles long. There were 3 collisions occurring in a 4-year study period, 1 resulting in a severe injury. The severe injury collision involved a pedestrian.

Existing Conditions
The corridor of Cecilia Street between Studebaker Road and Orr & Day Road a 2-lane residential roadway. Figure III-20 illustrates the corridor.

Figure III-20: Cecilia Street between Studebaker Road and Orr & Day Road Corridor

Recommended Improvements
• Perform further traffic evaluation for traffic calming along the corridor. • Install stop signs on the cross streets along this corridor at Benfield Avenue, Dalwood Avenue, and Elmcroft Avenue.
• Install Centerline
• Install high-visibility crosswalks at the stop-controlled intersection of Cecilia Street and Fairford Avenue

IV- Project Scopes

Page 57 ends

IV- Project Scopes

A list of potential project locations was developed considering the intersections and corridors with the highest weighted severity collisions and with the help of the Task Force.

These locations were then compared and grouped based on a systemic approach.

Because a LRSP is required for HSIP funding and has related objectives and goals, all of these projects were developed for HSIP funding.

The HSIP program has requirements to be eligible to compete for HSIP funding. These include:
• The total project costs must be greater than $100,000 for competitive BCR9 applications
• The BCR must be over 4.0
• Mitigations or project scopes must be selected from the LRSM10

A variety of methods to determine viable project scopes were used. Consideration was made of the locations of fatal and severe injury crashes, high-density crash locations, and the countermeasures identified to address the City’s safety issues. The LRSM was used to identify countermeasures to address qualitative and quantitative safety measures and select viable projects for the LRSP.

The project’s BCR must be calculated using the HSIP Analyzer11 by inputting the crashes and their severity, and the project’s cost estimate. Projects are weighed and selectively chosen by their BCR to compete for limited grant funding.

The BCR threshold of projects that were funded through previous HSIP funding cycles has been increasing recently. Projects in last cycle’s HSIP cycle 11 required a BCR of

9 Benefit-Cost Ratio (BCR) For some of the projects the cost summary will include a BCR value depending on the likely funding source. BCR is an important figure for determining the effectiveness of a proposed project. The benefit is based on many factors including collision history, collision severity, systemic approach, the crash reduction factor associated with the applied countermeasures, and whether the types of collisions can be mitigated with countermeasures being applied for the project. A higher BCR is considered a more favorable project.
10 Local Roadway Safety Manual (LRSM) is a document published by Caltrans identifying HSIP eligible mitigation measures, their collision reduction factors, and what type of collisions are most impacted by the mitigation measures. The mitigation measures are referred as countermeasures. The latest LRSM version and version 1.7 used in the LRSP is from April 2024.
11 HSIP Analyzer is a required document for HSIP projects which determines the project’s benefit based on the total crashes within the project area and their crash severity. The HSIP Analyzer is a tool used to calculate the project BCR.

IV- Project Scopes

Page 58 ends

18.0 and above to be awarded funding. Due to the increasing BCR threshold, projects with a BCR of 20.0 and above were considered competitive in this analysis.

A total of 7 project scopes were proposed with a BCR over 20.0 and met the minimum requested project cost. Each proposed project has a BCR that is historically competitive in HSIP funding. Table III-1 provides the Project Index. The chapters that follow will explore the project backgrounds, scope, cost summary, and potential funding sources.

Table III-1: LRSP Project Index
Project
Name Project Description Project
Estimate BCR
Potential
Funding
Source
Firestone
Corridor Traffic
Signal
Improvements
Upgrade signal hardware,
provide advanced detection, and
implement a leading pedestrian
interval to timing at 15 signalized
intersections on Firestone Blvd
$1,584,000 20
HSIP
(90%
Funded)
Pedestrian
Crosswalk
Upgrade 2 uncontrolled
crosswalks with high visibility
features
$224,000 N/A
HSIP Set
Aside
(90%
Funded)
Systemic Bike
Lane Corridor
BCR Project
Install Class II bike lanes with a
road diet at 2 corridors on Old
River School Road, and Downey
Avenue
$296,920 29.92
HSIP
(90%
Funded)
Systemic Bike
Lane Corridor
Set Aside
Project
Install Class II bike lanes with a
road diet at 2 corridors on
Brookshire Avenue and Foster
Road
$300,280 N/A
HSIP Set
Aside
(90%
Funded)
Systemic
Traffic Signal
Improvement
Project
Upgrade signal hardware at 12
intersections Citywide and
Upgrade signal left turn
phasing at 8 intersections
Citywide
$2,589,400 20
HSIP
(90%
Funded)

IV- Project Scopes

Page 59 ends

Project
Name Project Description Project
Estimate BCR
Potential
Funding
Source
Florence
Median Project
Install raised medians on
Florence Avenue between
Vultee Avenue and Woodruff
Avenue
$551,000 20.88
HSIP
(90%
Funded)
Systemic
Sidewalk
Project
Install Sidewalks on 3 roadways,
convert two roadways to one
way streets and install a
crosswalk at an intersection
$2,408,720 20
HSIP
(90%
Funded)

100- Firestone Corridor Traffic Signal Improvements

Page 60 ends

100- Firestone Corridor Traffic Signal Improvements
Overview

The Firestone Corridor Traffic Signal Improvements project was developed based on guidelines and funding eligibility of HSIP Cycle 12. The Firestone Corridor Traffic Signal Improvements project scope consists of the following LRSM Countermeasures:

2024 LRSM
Countermeasure ID Countermeasure Description
SI02 Upgrade Signal Hardware
SI18PB Pedestrian Countdown Heads
S22PB Modify Signal Timing to Implement an
LPI12

The upgrade signal hardware countermeasure will provide better visibility of intersection signals and will aid drivers’ advance perception of the upcoming intersection. This countermeasure involves upgrading signal back plates, larger signal heads, relocating signal heads or adding additional signal heads to an intersection.

A pedestrian countdown signal contains a timer display and counts down the number of seconds left to finish crossing the street. Countdown signals can reassure pedestrians who are in the crosswalk when the flashing “DON’T WALK” interval appears that they still have time to finish crossing. These signals have been shown to encourage more pedestrians to use the pushbutton.

An LPI gives pedestrians the opportunity to enter the intersection 3 -7 seconds before vehicles are given a green indication. With this head start, pedestrians can better establish their presence in the crosswalk before vehicles have priority to turn left o r right through the crosswalk. LPIs provide increased visibility of crossing pedestrians, reduce conflicts between pedestrians and vehicles, increase the likelihood of motorists yielding to pedestrians, and enhance safety for pedestrians who may be slower to start into the intersection.

12 Leading Pedestrian Interval (LPI) gives pedestrians the opportunity to enter an intersection 3 -7 seconds before vehicles are given a green indication.

100- Firestone Corridor Traffic Signal Improvements

Page 61 ends

The proposed scope of work is to:

Based on the LRSP analysis, the Firestone Boulevard corridor is the second highest weighted collision corridor in the City and four of the intersections (Firestone Boulevard/ Lakewood Boulevard, Firestone Boulevard/ Downey Avenue, Firestone Boulevard/ Rives Avenue, and Firestone Boulevard/ Ryerson Avenue) are in the top 10 highest weighted collision intersections in the City. These trends highlighted Firestone Boulevard as a corridor to investigate for LRSP project selection. In meetings with the Task Force , staff was interested in prioritizing signal upgrades to all the signalized intersections on Firestone Boulevard. Figure 100-1 identifies the 15 signalized intersections on Firestone Boulevard within Downey City Limits.

Scope of Work:

Upgrade signal hardware, upgrade to pedestrian countdown signal heads, and implement a leading pedestrian interval to the corridor timing at the following 15 signalized intersections on Firestone Boulevard within the Downey City Limits.

1. Firestone Boulevard & Arnett Street

2. Firestone Boulevard & Ryerson Avenue

3. Firestone Boulevard & Old River School Road

4. Firestone Boulevard & Rives Avenue

5. Firestone Boulevard & Paramount Boulevard

6. Firestone Boulevard & La Reina Avenue

7. Firestone Boulevard & Downey Avenue

8. Firestone Boulevard & Dolan Avenue

9. Firestone Boulevard & Brookshire Avenue

10. Firestone Boulevard & Patton Road

11. Firestone Boulevard & Lakewood Boulevard

12. Firestone Boulevard & Stonewood Center

13. Firestone Boulevard & Woodruff Avenue (West)

14. Firestone Boulevard & Woodruff Avenue (East)

15. Firestone Boulevard & Stewart and Gray Road

100- Firestone Corridor Traffic Signal Improvements

Page 62 ends

The costs and competitive BCR for this project are shown in Table 100-1.

Figure 100-1: City map
showing the proposed
intersections for Firestone
Corridor Traffic Signal
Improvements.

N

100- Firestone Corridor Traffic Signal Improvements

Page 63 ends

Table 100-1: Cost Estimate
Description Cost
Plans Specifications & Estimates $235,000
Construction Engineering $176,000
Construction Items $1,002,000
Construction Items Contingency (15%) $153,000
Total $1,588,400
BCR = 20.00

This countermeasure is eligible for 90% funding through HSIP. An expanded cost estimate is included in Appendix I.

Existing Conditions

Currently, the condition of signal hardware on Firestone Boulevard is outdated with small signal heads and weathered backplates, outdated pedestrian push buttons, and pedestrian indicators without pedestrian countdowns.

Figure 100-2: The
existing signal heads on
Firestone Boulevard at
Rives Ave.

100- Firestone Corridor Traffic Signal Improvements

Page 64 ends

Figure 100-3: The
existing signal heads on
Firestone Boulevard at
Old River School Road.

Figure 100-4:

Pedestrians crossing
Firestone Boulevard at
Downey Avenue
where LPI is proposed.

100- Firestone Corridor Traffic Signal Improvements

Page 65 ends

Figure 100-5: Small 8”
signal head on
Firestone Boulevard at
Dolan Avenue that is
proposed to be
replaced with a higher
visibility 12” vehicle
head.

Project Area Collision Trends

The Firestone Boulevard corridor is the second highest ranked roadway segment in the City and includes four of the top collision intersections from this LRSP analysis.

The LRSM identifies that signalized intersections with a high frequency of broadside and rear-end crashes that occur because drivers are unable to see traffic signal sufficiently in advance to safely negotiate the intersection being approached can be mitig ated with improving the signal hardware. There is a 15% collision reduction factor when upgrading traffic signal hardware.

The LRSM identifies that pedestrian countdown signal heads should be installed at signalized intersections where pedestrian vs. vehicle collisions have been reported. There is a 25% collision reduction factor in pedestrian and bicycle crashes with the inst allation of pedestrian countdown signal heads.

The LRSM identifies that LPIs should be installed in intersections with signalized pedestrian crossings that have high turning vehicular volumes and have had pedestrian vs. vehicle crashes. There is a 60% collision reduction factor in pedestrian and bicycl e crashes with the installation of LPIs.

At the 15 intersections identified in the scope of work, SWITRS data indicated that there were 357 collisions between 2020 and 2023. The HSIP Analyzer was used to calculate

100- Firestone Corridor Traffic Signal Improvements

Page 66 ends

the project benefit including these 357 total collisions broken down by collision severity, shown in Table 100-2.

Table 100-2: Collision Severity on 15 intersections on Firestone Boulevard Collision
Type Fatality Severe
Injury
Injury -
Other
Visible
Injury -
Complaint
of Pain
Property
Damage
Only
Total
Pedestrian
and Bicycle
Collisions
1 1 11 13 3 29
All
Collisions 2 2 54 165 134 357

Most collision types (shown in Figure 100-5) were the result of broadside and rear-end collisions, which can be mitigated with the signal hardware upgrade countermeasure proposed. Although only 8% of the total collisions involved pedestrians and bicyclists, 50% of the total fatality and severe injury collisions involved pedestrians and bicyclists.

BROADSIDE
33%

REAR END
26%

HIT OBJECT
16%

HEAD-ON
5%

SIDESWIPE
14%
OTHER
1%

AUTO/PED
4%

OVERTURNED
1%

COLLISION
TYPE
Figure 100-5: Collision Types at the Firestone Boulevard Signalized Intersections

100- Firestone Corridor Traffic Signal Improvements

Page 67 ends

Using the HSIP Cycle 12 BCR Analyzer, the calculated benefit for the project is shown in Table 100-3. The project benefit is $31,768,554, so a BCR of 20 would allow for this project to cost up to $1,588,400.

Table 100-3: Project Benefit by Countermeasures
Countermeasure Benefit
SI02: Signal Hardware Upgrades $14,933,600
SI18PB: Install Pedestrian Countdown Signal Heads $8,467,285 SI22PB: Implement an LPI $8,367,699
Total $31,768,554

200- Pedestrian Crosswalk Set Aside

Page 68 ends

200- Pedestrian Crosswalk Set Aside
Overview

The City of Downey applied for Pedestrian set -aside funding in HSIP Cycle 11 in 2022, using the scope of work identified in the 2022 LRSP. There is still one location identified that has yet to be funded, shown below in the proposed scope of work.

The Pedestrian Crosswalk Set Aside project was developed based on guidelines and historic funding eligibility of HSIP Cycle 12. The set-aside funding category is only available for certain types of safety projects, including pedestrian crossing enhancements. The maximum funding available for pedestrian crossing enhancements is $350,000. This funding can be awarded to a City one time per HSIP cycle and is typically awarded to any agency that requests it. This type of funding does not require a BCR calculation or detailed collision data. The Pedestrian Crosswalk Set Aside project scope consists of upgrading existing uncontrolled pedestrian crosswalks with RRFB 13, high visibility signage, and high visibility striping. The project scope consists of the following countermeasure:

2024 HSIP Funding Set-asides
Set-aside for Pedestrian Crosswalk
Enhancements

Upgrading pedestrian crossings will improve safety for pedestrians and biyclists. The enhanced pedestrian crossings make motorists more aware of pedestrians in the roadway at uncontrolled crosswalk locations. The proposed scope of work is to:

13 Rectangular Rapid Flashing Beacon (RRFB)
Scope of Work:

Upgrade existing uncontrolled pedestrian crosswalks at 2 locations. Upgrades include bulb-outs, RRFBs, advance overhead flashing beacons, and high visibility signing and striping.

• Rives Avenue at Adwen Street
• Conrad Street at Montgomery Street

200- Pedestrian Crosswalk Set Aside

Page 69 ends

Bulb-outs and curb extensions narrow the roadway to create a shorter distance for pedestrians to cross. Also, the narrowed roadway leads motorists to driving slower. The RRFBs, over-head flashing beacons, and high visibility striping make it easier for dri vers to see crossings and pedestrians in the roadway. An example of signing and striping enhancements can be found at the crosswalk on Brookshire Avenue at Everest Street in the City of Downey. The improvements include RRFBs, advance overhead flashing beacons, signs and pavement markings include a yield bar and “Slow School Crossing” and “Wait Here” pavement markings and signs, shown in Figure 200-1.

Figure 200-1: Example of pedestrian crosswalk enhancements on Brookshire Avenue at Everest Street

Task Force members were present in the development of this project and shared school crosswalk locations which could benefit most from these enhancements and ensure that all recommendations are consistent with the City’s Road and Street Standards. These discussions helped determine the crosswalks prioritized for this project. The following list of uncontrolled crosswalks were identified for pedestrian crossing enhancements from the Task Force meeting:

Table 200-1: Priority List for Crosswalk Enhancements
Priority Location
1 Rives Avenue at Adwen Street
2 Conrad Street at Montgomery Street

Figure 200-2 Identifies the 2 locations for proposed pedestrian crossing enhancements.

200- Pedestrian Crosswalk Set Aside

Page 70 ends

The construction costs are broken down by location for ease of use when the City chooses intersections to apply for future HSIP Calls for Projects, shown in Table 200-2. The unit prices and construction cost line items are detailed in the Appendix II.

Figure 200-2: Citywide map
showing the school crosswalk
locations of proposed
pedestrian crossing
enhancements.

N
Legend
Crosswalk Location

2 1
1 St Raymond
School
Williams
Elementary
School

200- Pedestrian Crosswalk Set Aside

Page 71 ends

Table 200-2: Construction Cost Estimate
Location Proposed Crosswalk Enhancements Construction
Cost14
1- Rives Avenue at
Adwen Street
RRFBs at the Crosswalk, ADA ramp
upgrades, and Signing and Striping
Enhancements
$80,000
2- Conrad Street at
Montgomery Street
RRFBs at the Crosswalk, ADA ramp
upgrades, and Signing and Striping
Enhancements
$80,000
Total Construction Cost $160,000

Table 200-3 shows the total cost breakdown for future HSIP Calls for Projects.

Preliminary engineering and construction engineering are limited to 25% and 15% of the construction costs, respectively. These are the maximum cost percentages for preliminary engineering and construction engineering costs based on HSIP guidelines and were used for this project’s total cost estimate. This project is eligible to be 90% federally funded, up to $350,000 based on guidelines from HSIP Cycle 12.

Table 200-3: Total Cost Estimate
Description Cost
Plans Specifications & Estimates $40,000
Construction Engineering $24,000
Construction Items $160,000
Total $224,000

14 Construction cost of each location includes a 15% contingency.

200- Pedestrian Crosswalk Set Aside

Page 72 ends

Existing Conditions

Figure 200-3: This
crossing on Rives
Avenue at Adwen
Street is faded.

Figure 200-4: This
crossing on Conrad
Street at Montgomery
Street does not have a
curb ramp at the St.

Raymond School side
of the crosswalk.

300- Systemic Bike Lane Corridor

Page 73 ends

300- Systemic Bike Lane Corridor
Overview

The Systemic Bike Lane Corridor project was developed based on the City of Downey Bicycle Master Plan and collision history. The Systemic Bike Lane Corridor project scope consists of the following LRSM Countermeasure(s):

2024 LRSM Countermeasure ID Countermeasure Description
R33PB
and/or Bike Safety Set Aside Install bike lanes

A bike lane project can get funding either through a traditional BCR HSIP application or using the Bicycle Safety Set Aside project funding based on eligibility of HSIP Cycle 12.

The set-aside funding category is only available for certain types of safety projects, including installing bike lanes. The maximum funding available for bicycle safety is $350,000. This funding can be awarded to a City one time per HSIP cycle and is typically awarded to any agency that requests it. This type of funding does not re quire a BCR calculation or detailed collision data. Due to only Downey Avenue having a recent collision history along the project corridor, it is recommended to break this project into two HSIP applications in order to optimize the amount of funding that can be secured.

This countermeasure is used on roadway segments with crashes between bicycles and vehicles or crashes that may be preventable with a buffer/ shoulder. Most studies suggest that bike lanes may provide protection against bicycle/motor vehicle collisions. Str iped bike lanes can be incorporated into a roadway when it is desirable to delineate which available road space is for exclusive or preferential use by bicyclists. The scope of work for this project is listed below:

300- Systemic Bike Lane Corridor

Page 74 ends

These four proposed segments are good candidates for Class II bike lanes based on their collision history and are identified as planned bicycle projects in the Downey Bicycle Master Plan. Based on input from the Task Force, it is imperative to keep on -street parking in place on these segments. The proposed bike lanes will be installed by implementing a lane reduction on these segments by reducing the through lanes to one lane in each direction and installing a two-way left turn lane in the middle of the roadway to make available space for the bike lanes and on -street parking. The intersection lane configuration should remain in place to avoid congestion on these three segments.

Figure 300-1 Highlights the locations of the 4 proposed bike lane segments in the City of Downey overlaid on the City of Downey’s Bicycle Master Plan map. The Bicycle Master Plan Map identifies where existing bicycle facilities are and shows how these proposed bike lanes will close gaps in the bicycle system.

Scope of Work:

Install Class II bike lanes with a lane reduction, keeping parking at the following 4 roadway segments:
• Using a BCR Application:
o Downey Avenue between Firestone and the South City Limit • Using a Bike Safety Set Aside Application:
o Old River School Road between Firestone Place and Florence Avenue o Brookshire Avenue between Imperial Highway and Iowa Street o Foster Road between Lakewood Boulevard and the East City Limit

300- Systemic Bike Lane Corridor

Page 75 ends

The construction costs are broken down by location for ease of use when the City chooses intersections to apply for future HSIP Calls for Projects, shown in Table 200-2. The unit prices and construction cost line items are detailed in the Appendix II.

Proposed Set Aside Bike Lane Project
Proposed BCR Bike Lan Project
Figure 300-1: Systemic
Bike Lane Corridor
project locations

300- Systemic Bike Lane Corridor

Page 76 ends

Table 300-1: Construction Cost Estimate
Location Proposed Bike Safety Enhancements Construction Cost15
Downey Avenue between
Firestone and the South
City Limit
Reduce the number of lanes to one lane
in each direction, with a two-way-left-
turn lane and Class II bike lanes.
$130,600
Old River School Road
between Firestone Place
and Florence Avenue
Reduce the number of lanes to one lane
in each direction, with a two-way-left-
turn lane and Class II bike lanes.
$53,850
Brookshire Avenue between
Imperial Highway and Iowa
Street
Reduce the number of lanes to one lane
in each direction, with a two-way-left-
turn lane and Class II bike lanes.
$84,800
Foster Road between
Lakewood Boulevard and
the East City Limit
Reduce the number of lanes to one lane
in each direction, with a two-way-left-
turn lane and Class II bike lanes.
116,050
Total Construction Cost $385,300

The costs and competitive BCR for this the bike lane project on Downey Avenue are shown in Table 300-2. Three scenarios are presented in Table 300-2.

1. The first scenario shows the cost breakdown and BCR of a project including all 4 corridors. The BCR is too low to be competitive.

2. The second scenario shows the cost breakdown and BCR of a project only including the Downey corridor, showing the maximum BCR possible for this project.

3. The third scenario would include two HSIP applications submitted in one cycle where the following corridors will be split into a BCR application and a bicycle safety set-aside application, maximizing the set-aside funding request while the BCR application has a competitive BCR
• Set Aside Application: Brookshire Avenue & Foster Road Corridors • BCR Application: Downey Avenue & Old River School Road Corridors

15 Construction cost of each location includes a 15% contingency.

300- Systemic Bike Lane Corridor

Page 77 ends

Table 300-2: Downey Bike Lane Cost Estimate
Description Scenario 1
(All)
Scenario 2
(Downey)
Scenario 3 (Split
into 2 applications)
Set
Aside BCR
Plans Specifications &
Estimates $96,300 $33,360 $43,300 $53,000
Construction Engineering $57,800 $20,000 $26,000 $31,800 Construction Items $385,300 $116,050 $200,850 $184,450
Construction Items
Contingency (15%) $57,800 $17,400 $30,130 $27,670
Total $597,200 $186,810 $300,280 $296,920
BCR 14.87 47.56 N/A 29.92

The third scenario is the optimal scenario for the City to apply for HSIP Cycle 12 funding.

This countermeasure is eligible for 90% funding through HSIP. Therefore, the City would have to provide a local match of $ 59,720 to receive funding for this project. An expanded cost estimate is included in Appendix III.

It should be noted that historically, HSIP has $350,000 of set aside funding available that each City can apply for in each funding cycle. This set aside funding is typically awarded to any jurisdiction that applies for it. The City may be awarded the maximum set aside funding each HSIP Cycle for consecutive HSIP Cycles, if the City wishes to apply for pedestrian crossing enhancement funding in phases.

300- Systemic Bike Lane Corridor

Page 78 ends

Existing Conditions

The existing roadway conditions on the three segments are shown in the figures below:

Figure 300-2: The existing roadway configuration on Old River School Road between Firestone Boulevard and Florence Avenue. There are currently two through lanes in each direction with parking on both sides of the street and cyclists share the road with motor vehicles. The proposed project will reduce the roadway to one through lane in each direction with parking and bike lanes on both sides of the street, and a two-way left turn lane. This proposed bike lane segment is consistent with the planned bike lane with road diet identified in the Downey Bicycle Master Plan.

300- Systemic Bike Lane Corridor

Page 79 ends

Figure 300-3: The existing roadway configuration on Brookshire Avenue between Imperial Highway and Iowa Street. There are currently two through lanes in each direction with parking on both sides of the street and cyclists share the road with motor vehicles. The proposed project will reduce the roadway to one through lane in each direction with parking and bike lanes on both sides of the street, and a two -way left turn lane. This proposed bike lane segment is consistent with the planned bike lane with road diet identified in the Downey Bicycle Master Plan. This proposed bike lane will be a gap closure, connecting with the existing bike lane on Brookshire Avenue, south of Imperial Highway.

300- Systemic Bike Lane Corridor

Page 80 ends

Figure 300-4: The existing roadway configuration on Foster Road between Lakewood Boulevard and the East City Limit. There are currently two through lanes in each direction with parking on both sides of the street and cyclists share the road with motor vehicles. The proposed project will reduce the roadway to one through lane in each direction with parking and bike lanes on both sides of the street, and a two -way left turn lane. This proposed bike lane segment is consistent with the planned bike lane with road diet identified in the Downey Bicycle Master Plan. This proposed bike lane will be a gap closure, connecting with the existing bike route on Gardendale Street.

300- Systemic Bike Lane Corridor

Page 81 ends

Figure 300-5: The existing roadway configuration on Downey Avenue between Firestone Boulevard and the South City Limit. There are currently two through lanes in each direction with parking on both sides of the street and cyclists share the road with motor vehicles. The proposed project will reduce the roadway to one through lane in each direction with parking and bike lanes on both sides of the street, and a two-way left turn lane. This proposed bike lane segment is consistent with the planned bike lane with road diet identified in the Downey Bicycle Master Plan. This proposed bike lane will be a gap closure, connecting with the existing bike route on Gardendale Street.

300- Systemic Bike Lane Corridor

Page 82 ends

South of the proposed Brookshire Avenue segment on Brookshire Avenue between Gardendale Street and Imperial Highway, there are existing bike lanes with a road diet, shown in Figure 300-6. The proposed bike lanes with a road diet on the 3 proposed segments will look very similar to this existing stretch.

Project Area Collision Trends

The countermeasures for the Systemic Bike Lane Corridor project provide improvements for pedestrians and bicyclists. However, this means only collisions involving pedestrians and bicyclists can be considered. The LRSM identifies that installing bike lanes would likely provide a 35% collision reduction factor for pedestrian and bicycle related collisions.

Bike lanes will reduce the width of travel lanes and likely have a traffic calming effect. The HSIP Analyzer was used to calculate the project benefit including the 5 total bicycle and pedestrian and bicycle-involved collisions broken down by severity below in Table 300-

3. Only Downey Avenue had reported bicycle or pedestrian involved collisions within the project area.

Figure 300-6: Existing bike lane
with lane reduction on
Brookshire Avenue between
Gardendale Street and
Imperial Highway

300- Systemic Bike Lane Corridor

Page 83 ends

Table 300-3: Collision Severity of Ped and Bike Collisions Location Fatality Severe
Injury
Injury -
Other
Visible
Injury -
Complaint
of Pain
Property
Damage
Only
Total
Downey Avenue 0 2 2 1 0 5
Old River School
Road 0 0 0 0 0 0
Brookshire Avenue 0 0 0 0 0 0
Foster Road 0 0 0 0 0 0

Using the HSIP Cycle 12 BCR Analyzer, the calculated benefit for the project. The project benefit is $8,884,114 to install bike lanes, so a BCR of 20 would allow for this project to cost up to $444,200, allowing to add multiple corridors besides Downey Avenue to create a systemic project.

400- Systemic Traffic Signal Improvement Project

Page 84 ends

400- Systemic Traffic Signal Improvement Project
Overview

The Systemic Traffic Signal Improvement Project was developed based on a systemic approach of selecting intersections with outdated signal hardware throughout the City of Downey and selecting 8 intersections that could be upgraded to a protected left turn phase from protected permissive from the top 10 intersections identified in the collision analysis. This project consists of 19 signalized intersections. The project scope consists of the following LRSM Countermeasures:

2024 LRSM
Countermeasure ID Countermeasure Description
SI02
Improve signal hardware: lenses,
back-plate with retroreflective borders,
mounting size, and number
SI06 Provide protected left turn phase
where left turn lane already exists

400- Systemic Traffic Signal Improvement Project

Page 85 ends

This countermeasure will improve visibility of traffic signals for motorists to see from greater distances. The proposed scope of work is as follows:

The upgrade signal hardware countermeasure will provide better visibility of intersection signals and will aid drivers’ advance perception of the upcoming intersection. This countermeasure involves upgrading signal back plates, larger signal heads, relocat ing signal heads or providing additional signal heads to an intersection. Figure 400-1 identifies the location of the 11 intersections that will receive traffic signal improvements.

Scope of Work:

Remove and replace existing traffic signal hardware with upgraded hardware at the 1 2 intersections listed below. These upgrades include 12-inch traffic signal heads where 8-inch traffic signal heads are still in use and new signal backplates that will replace signals with missing, faded, or damaged backplates.

1. Suva Street at Bluff Road

2. Downey Avenue at 5th Street

3. Downey Avenue at Alameda Street

4. Brookshire Avenue at 5th Street

5. Brookshire Avenue at 3rd Street

6. Brookshire Avenue at Iowa Street

7. Brookshire Avenue at Alameda Street

8. Brookshire Avenue at Gardendale Street

9. Gardendale Street at Barlin Avenue

10. Gardendale Street at Paramount Boulevard

11. Columbia Way at Adoree Street

12. Columbia Way at Foster Road
Replace the protected permissive left turn phasing with protected left turn phasing at the 7 intersections listed below.

13. Downey Avenue at Firestone Boulevard

14. Florence Avenue at Woodruff Avenue

15. Rives Avenue & Firestone Boulevard

16. Paramount Boulevard at Telegraph

17. Downey Avenue at Gardendale

18. Paramount Boulevard at Florence Avenue

19. Firestone Boulevard at Ryerson Avenue

400- Systemic Traffic Signal Improvement Project

Page 86 ends

The protected left turn phase countermeasure will improve the safety for left-turn maneuvers by removing the need for drivers to navigate through gaps in oncoming/ opposing through vehicles. Where left-turn pockets are not protected the pedestrian and bicyclist crossing phase often conflicts with these left-turn movements. Drivers focused on navigating the gaps of oncoming cars may not anticipate or perceive the non - motorized users. Figure 400-1 identifies the location of the 8 intersections that will receive protected left turn phasing improvements.

1 12
11 9
3 2
8 7
5 4
6 N
Figure 400-1: Area
map identifying the 19
locations of the
Systemic Traffic Signal
Improvement project
in the City of Downey.

Legend
Signal Hardware Upgrade Location
Protected Left Turn Phasing Upgrade Location
#
#
13 14
16 15
18 17
19 10

400- Systemic Traffic Signal Improvement Project

Page 87 ends

This Systemic Traffic Signal Improvement Project can be submitted for future HSIP funding. The BCR is based on the 2024 HSIP Analyzer. When applying for funding, this value may be different based on the factors of future HSIP Analyzer forms. The costs and competitive BCR for this project are shown in Table 400-1.

Table 400-1: Cost Estimate
Description Cost
Plans Specifications & Estimates $462,400
Construction Engineering $277,400
Construction Items $1,849,600
Total $2,589,400
BCR = 20.0

This countermeasure is eligible for 90% funding through HSIP. Therefore, the City would have to provide a local match of $ 258,900 to receive funding for this project. An expanded cost estimate is included in Appendix IV.

Existing Conditions

Currently, many of the traffic signals at the 12 locations with proposed signal hardware upgrades have faded or missing backplates and traffic signal heads that are smaller than the standard size. The following figures show the conditions of the existing traffic signal hardware at these project locations.

400- Systemic Traffic Signal Improvement Project

Page 88 ends

Figure 400-2: The
signals on Brookshire
Avenue at 5th Street
have 8-inch signal
heads that should be
upgraded.

Figure 400-3: The
signals on Columbia/
Foster have missing or
faded backplates and
have small 8-inch
signal heads. This
intersection is shared
with the City of
Bellflower. The HSIP
application should be
prepared in
coordination with the
City of Bellflower. It is
important to verify that
all the enhancements
can be accommodated
by their City’s existing
traffic system.

400- Systemic Traffic Signal Improvement Project

Page 89 ends

Figure 400-4: The
signals on Downey
Avenue at 5th Street
have 8-inch signal
heads with missing
and faded backplates
that should be
upgraded.

Figure 400-5: The
signals on Downey
Avenue at Alameda
Street have 8-inch
signal heads that
should be upgraded to
all 12-inch signal
heads.

400- Systemic Traffic Signal Improvement Project

Page 90 ends

Figure 400-6: The
signals on Suva Street
at Bluff Road have 8-
inch signal heads with
missing backplates
that should be
upgraded.

Figure 400-7: The
signals on Brookshire
Avenue at Alameda
Street have 8-inch
signal heads that
should be upgraded.

400- Systemic Traffic Signal Improvement Project

Page 91 ends

Project Area Collision Trends

The City of Downey’s collision data included in this project occurred at or within 250 feet from the intersection.

The LRSM identifies that signalized intersections with a high frequency of broadside and rear-end crashes that occur because drivers are unable to see traffic signal sufficiently in advance to safely negotiate the intersection being approached can be mitig ated with improving the signal hardware. There is a 15% collision reduction factor when upgrading traffic signal hardware.

The LRSM identifies that providing protected left turn phases would likely mitigate rear - end, sideswipe and broadside crashes. There is a 30% collision reduction factor when providing protected left turn phasing to an intersection.

At the 19 intersections identified in the scope of work, there were 229 collisions between 2020 and 2023. The HSIP Analyzer was used to calculate the project benefit including these 329 total collisions broken down by severity in Table 400-2.

Table 400-2: Collision Severity on 19 intersections on Firestone Boulevard Collision
Type Fatality Severe
Injury
Injury -
Other
Visible
Injury -
Complaint
of Pain
Property
Damage
Only
Total
All
Collisions
on the 12
S02
locations
1 1 12 24 20 58
All
Collisions
on the 7
S06
locations
4 4 28 75 60 171

39% of the collision types (shown in Figure 400-8) were broadside collisions. The second most common type was a rear-end collision. Upgrading the signal hardware and providing protected left turn phasing is best used on signalized intersections with a high frequency of broadside and rear-end crashes.

400- Systemic Traffic Signal Improvement Project

Page 92 ends

Figure 400-8: Collision Types at the 19 Project Intersections Using the HSIP Cycle 12 BCR Analyzer, the calculated benefit for the project is shown in Table 100-3. The project benefit is $50,424,888, so a BCR of 20 would allow for this project to cost up to $2,521,244.

Table 100-3: Project Benefit by Countermeasures
Countermeasure Benefit
SI02: Signal Hardware Upgrades $ 3,743,195
SI06: Provide Protected Left Turn Phasing $ 48,045,007
Total $51,788,202

REAR END
26%

HIT OBJECT
13%

HEAD-ON
5%

BROADSIDE
39%

SIDESWIPE
12%

AUTO/PED
3%
OTHER
2%

COLLISION
TYPE

500- Florence Median Project

Page 93 ends

500- Florence Median Project
Overview

Florence Avenue corridor has the 5th highest collision weighted value in the City. The Florence Median project was developed based on recommendations from the Task Force. The project scope consists of the following LRSM Countermeasures:

2024 LRSM
Countermeasure ID Countermeasure Description
R08 Install raised median

Installing raised medians is an effective strategy in reducing head on, sideswipe and broadside collisions outside of intersections as it reallocates the existing cross section to incorporate a buffer between the opposing travel lanes and reinforces the limits of the travel lane. Raised medians may also be used to limit unsafe turing movements along a roadway.

Based on comments from the Task Force, the emergency services departments should be invited to comment throughout the design process of this project to ensure emergency vehicles will have space to move through this segment. The concept map of the proposed raised median is below in Figure 500-1.

Scope of Work:

Install a raised median on Florence Avenue between Vultee Avenue and Woodruff Avenue.

Figure 500-1: Concept map of proposed
median openings on Florence Avenue.

Florence Ave Vultee Ave Haledon Ave Woodruff Ave Legend Existing Raised Median
Proposed Raised Median

500- Florence Median Project

Page 94 ends

The costs and competitive BCR for this project are shown in Table 500-1.

Table 500-1: Cost Estimate
Description Cost
Plans Specifications & Estimates $82,400
Construction Engineering $62,000
Construction Items $370,000
Construction Items Contingency (10%) $37,000
Total $551,000
BCR = 20.88

This countermeasure is eligible for 90% funding through HSIP. Therefore, the City would have to provide a local match of $ 55,510 to receive funding for this project. An expanded cost estimate is included in Appendix V.

Existing Conditions

Florence Avenue currently has three through lanes in each direction with a painted median separating directions of travel. The third travel lane acts as a parking lane during off-peak hours. Florence Avenue fronts some apartment complexes and a church with in the project segment. The painted median does not allow left -turning movements mid- block.

Figure 500-2: There is
currently a painted
median on Florence
Avenue from Vultee
Avenue to Woodruff
Avenue.

500- Florence Median Project

Page 95 ends

Figure 500-3: There will
be a proposed median
opening at Florence
Avenue at Haledon
Avenue. The proposed
raised median will deter
driver stunts in the future
such as the tire marks
shown hinting that a
driver was doing donuts
in the middle of the road.

Project Area Collision Trends

The countermeasure for the Florence Median Project reduces the possibility of midblock collisions. The countermeasure to install raised medians is best used in areas experiencing head-on collisions that may be affected by both the number of vehicles that cross the centerline and by the speed of oncoming vehicles. The LRSM identifies that the installing raised medians would likely provide a 25% collision reduction factor for mid - block collisions.

The HSIP Analyzer was used to calculate the project benefit including the 25 total collisions broken down by severity below. The collisions identified in the table below were from a 4.6 year period, with the years 2020 and 2021 skipped due to lower collision rates due to the change in traffic conditions from the COVID-19 pandemic. The highest possible project benefit identified 25 collisions between 7/3/2016 -9/14/2019, skipping 2020 and 2021, and including collisions between 1/5/2022-6/1/2023.

Table 500-2: Collision Severity
Location Fatality Severe
Injury
Injury -
Other
Visible
Injury -
Complaint
of Pain
Property
Damage
Only
Total
Florence
Avenue 1 2 3 8 11 25

500- Florence Median Project

Page 96 ends

Using the HSIP Cycle 12 BCR Analyzer, the calculated benefit for the project is $11,505,105, so a BCR of 20 would allow for this project to cost up to $575,255.

600- Sidewalk Install Project

Page 97 ends

600- Sidewalk Install Project

Overview

This project was identified from the spot location analysis when reviewing the top 10 corridors with the highest weighted collision severity between 2020 and 2023. This project needs to be further discussed with the Task Force before proceeding with finalizing the project and prioritizing it. The project scope consists of the following LRSM Countermeasures:

2024 LRSM
Countermeasure ID Countermeasure Description
R20 Convert from two-way to one-way
traffic
R35PB Install sidewalk/pathway (to avoid
walking along roadway)
NS23PB
Install pedestrian crossing at
uncontrolled locations with
enhanced safety features

The top ranked corridor was along Klondike Avenue with a severe injury collision involving a pedestrian. The 7th ranked corridor along Vista Del Rio Drive showed similar characteristics to Klondike Avenue, so these two locations were combined to make a systemic project. Installing raised medians is an effective strategy in reducing head on, sideswipe and broadside collisions outside of intersections as it reallocates the existing cross section to incorporate a buffer between the opposing travel lanes and reinforces the limits of the travel lane. Raised medians may also be used to limit unsafe turing movements along a roadway.

600- Sidewalk Install Project

Page 98 ends

Project Area Collision Trends

Two severe injury/ fatal collisions were identified within the project limits of Klondike Avenue and Vista Del Rio Drive. Both of these collisions involved a pedestrian walking in the street.

Using the HSIP Cycle 12 BCR Analyzer, the calculated benefit for the project is shown in Table 600-1. The project benefit is $41,219,379, so a BCR of 20 would allow for this project to cost up to $2,408,720.

Table 600-1: Project Benefit by Countermeasures
Countermeasure Benefit
NS23PB: Install pedestrian crossing at uncontrolled locations with enhanced safety features $ 8,034,004
R35PB: Install sidewalk $26,230,356
R20: Convert from two-way traffic to one-way traffic $6,955,019 Total $41,219,379

Scope of Work:

Install a sidewalk on the following 3 roadways:

1. Klondike Avenue (both sides of the roadway)

2. Bixler Avenue (both sides of the roadway)

3. Vista Del Rio Drive (one side of the roadway)
To accommodate the sidewalk width and keep parking on Klondike Avenue and Bixler Avenue, both parallel roadways will be converted to opposing one -way streets.

A high visibility crosswalk will be installed at the intersection of Vista Del Rio Drive at Lemoran Avenue where the pedestrian bridge leads into the roadway.

V- Next Steps

Page 99 ends

V- Next Steps
The objective of this chapter is to account for safety ideas that were not able to be developed into projects. Some of these ideas came from the goals and visions outlined by the City, discussions with the Task Force, and data analysis. These ideas can evo lve when reviewing future data and how the emphasis of state funding progresses. Also, these ideas can be coupled with new trends that may emerge.

Citywide Lighting Program: City Staff had interest in reducing night time collisions with a project that would install lighting across dark corridors in the City. However, there was a very low night-time collision rate. Future collision data should be monitored for new collision trends showing an increase in night-time collisions in unlit corridors within the City.

This has been revisited and there were only 20 reported collisions occurring at night with no street lights on the roadway. Of the 3,266 collisions reported Citywide between 2020 and 2023, this only effects less than 1% of the total collisions

This report should be re-evaluated and updated every few years. New collision trends can develop with time and should be evaluated, and projects and programs relating to new trends should be proactively developed to reach the City’s safety visions and goal s. and goals.

Appendices
Appendix I: Firestone Corridor Traffic Signal Improvements

HSIP Analyzer

HSIP Analyzer

Page 1 of 11 ends

Version date:April 2024
Application ID:

HSIP ANALYZER (for BCR Applications)
Benefit Cost Ratio (BCR) Calculation
for Highway Safety Improvement Program (HSIP) Application Important: Review and follow the step-by-step instructions in the HSIP Analyzer Manual. Completing the HSIP Analyzer without referencing to the manual may result in an application with fatal flaw s that will be disqualified from the ranking and selection process.

This is a dynamic form (i.e. later steps vary depending on the data entered in earlier steps). If any error messages appear, please fix the errors prior to proceeding to the next steps.

Save this file using "HA" +Application ID as the file name (e.g. "HA03-Sacramento-01.pdf").

Application ID, Project Location and Project Description (copy from the HSIP Application Form):

Section I: General Information
Application ID:

Project Description:
(limited to 250 characters)
15 signalized intersections on Firestone Boulevard within the City of DowneyProject Location:
(limited to 250 characters)
Number of Signalized Intersections:15 Number of Non-signalized Intersections:

Miles of Roadways*:*Do not include the length of the intersections that have been accounted for in the number of intersections above.

HSIP Analyzer

Page 5 of 11 ends

Version date:April 2024
Application ID:

Step 1: Select safety countermeasures
Does this application include Signalized Intersections (SI)?Yes Does this application include Non-signalized Intersections (NS)? Does this application include Roadway Segments (R)?
* Normally a BCR application only includes locations of one of the above 3 categories (SI, NS or R). Multiple categories may be selected if the application proposes corridor safety improvements or uses a systemic approach, or the applicant chooses to bundle multiple locations in the same vicinity together.

Signalized Intersections (SI):

Click the check box in the 1st column to select up to 3 countermeasures.

Hide unselected countermeasures View all countermeasures Select No.Countermeasure Name
1 SI01NT: Add intersection lighting (S.I.) (CRF=0.4 for Night crashes; Life=20 yrs; FE=90%) ✔2 SI02: Improve signal hardware: lenses, back-plates with retroreflective borders, mounting, size, and number (CRF=0.15 for All crashes; Life=10 yrs; FE=90%)
3 SI03: Improve signal timing (coordination, phases, red, yellow, or operation) (CRF=0.15 for All crashes; Life=10 yrs; FE=50%) 4 SI04EV: Install emergency vehicle pre-emption systems (CRF=0.7 for Emergency vehicle crashes; Life=10 yrs; FE=90%) 5 SI05: Install left-turn lane and add turn phase (signal has no left-turn lane or phase before) (CRF=0.55 for All crashes; Life=20 yrs; FE=90%) 6 SI06: Provide protected left turn phase (left turn lane already exists) (CRF=0.3 for All crashes; Life=20 yrs; FE=90%) 7 SI07: Convert signal to mast arm (from pedestal-mounted) (CRF=0.3 for All crashes; Life=20 yrs; FE=90%) 8 SI08: Install raised pavement markers and striping (through intersection) (CRF=0.1 for All crashes; Life=10 yrs; FE=90%) 9 SI09: Install flashing beacons as advance warning (S.I.) (CRF=0.3 for All crashes; Life=10 yrs; FE=90%) 10 SI10: Improve pavement friction (High Friction Surface Treatments) (CRF=0.55 for All crashes; Life=10 yrs; FE=90%) 11 SI11: Install raised median on approaches (S.I.) (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 12 SI12PB: Install pedestrian median fencing on approaches (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 13 SI13: Create directional median openings to allow (and restrict) left-turns and u-turns (S.I.) (CRF=0.5 for All crashes; Life=20 yrs; FE=90%) 14 SI14: Install right-turn lane (S.I.) (CRF=0.15 for All crashes; Life=20 yrs; FE=90%) 15 SI15: Reduced Left-Turn Conflict Intersections (S.I.) (CRF=0.5 for All crashes; Life=20 yrs; FE=90%) 16 SI16RA: Convert intersection to roundabout (from signal) (CRF varies for All crashes; Life=20 yrs; FE=90%) 17 SI17RA: Convert intersection to compact roundabout (from signal) (CRF varies for All crashes; Life=20 yrs; FE=90%) ✔18 SI18PB: Install pedestrian countdown signal heads (CRF=0.25 for Ped & Bike crashes; Life=20 yrs; FE=90%) 19 SI19PB: Install pedestrian crossing (S.I.) (CRF=0.25 for Ped & Bike crashes; Life=20 yrs; FE=90%) 20 SI20PB: Pedestrian Scramble (CRF=0.4 for Ped & Bike crashes; Life=20 yrs; FE=90%) 21 SI21PB: Install advance stop bar before crosswalk (Bicycle Box) (CRF=0.15 for Ped & Bike crashes; Life=10 yrs; FE=90%) ✔22 SI22PB: Modify signal phasing to implement a Leading Pedestrian Interval (LPI) (CRF=0.6 for Ped & Bike crashes; Life=10 yrs; FE=90%)

HSIP Analyzer

Page 6 of 11 ends

Version date:April 2024
Application ID:

Step 2: Click to generate table for project locations, enter the project locations and select countermeasures for each location. If any of the selections have been changed, you must re-click the below button to refresh.

Click to Generate Table for Project Locations Entry
CMs have been selected. Ok to proceed.
+/- Line Location
No.

Location Description
(Intersection Name or Road Limit or General Description) Click to select
Countermeasures
Error Messages
(must resolve)
(Signalized Intersections)
SI02 SI18PB SI22PB
+
-SI_1 All 15 intersections ●●●

HSIP Analyzer

Page 7 of 11 ends

Version date:April 2024
Application ID:

Step 3: Click to generate tables for crash data and provide crash data. If any changes have been made in the previous two steps, you must re-click to refresh.

Click to Generate Tables for Crash Data Entry
Crash Data Periods: you may use one or two time periods. The total time periods must be between 3 and 5 years.

The crash data to be entered are combined from both periods if two periods are used. from (MM/DD/YYYY):01/03/2020 To (MM/DD/YYYY):12/26/2023 Combined Crash Data Period (years) =3.98
Fill out the crash data table(s) for the crash type(s) as required by the selected countermeasure(s) in Step 2.

Fill in yellow fields only. "Total" fields are calculated. Gray fields (if any) are locked as data are NOT needed for those fields.

To (MM/DD/YYYY):from (MM/DD/YYYY):

Crash Data Period 1:

Crash Data Period 2 :

Crash Data Table for Crash Type: ALL
No.Location No : Description
(from Step 2)
Fatal
(ALL)
Severe
Injury (ALL) Other Visible
Injury (ALL)
Complaint
of Pain
(ALL)
PDO
(ALL)Total1
SI_1: All 15 intersections2254 165 134 357
Total2254 165 134 357
Crash Data Table for Crash Type: Pedestrians and Bicyclists Involved (P&B) No.Location No : Description
(from Step 2)
Fatal
(P&B)
Severe Injury
(P&B) Other Visible
Injury (P&B)
Complaint
of Pain
(P&B)
PDO
(P&B)Total1
SI_1: All 15 intersections1111133 29
Total1111133 29

HSIP Analyzer

Page 8 of 11 ends

Version date:April 2024
Application ID:

Step 4: Click to Calculate the project benefit. If any changes have been made in the previous two steps, you must re-click to refresh.

Click to Perform Benefit Calculation Benefit Summary:

Benefit by Locations
Location No : Description [CM1 ID][CM1] Benefit [CM2 ID][CM2] Benefit [CM3 ID][CM3] Benefit Total Benefit SI_1: All 15 intersections [SI02] $14,933,600 [SI18PB] $8,467,285 [SI22PB] $8,367,669 $31,768,554 Total $31,768,554

Benefit by Countermeasures
No.Countermeasure Benefit
1 SI02: Improve signal hardware: lenses, back-plates with retroreflective borders, mounting, size, and number $14,933,600 2 SI18PB: Install pedestrian countdown signal heads $8,467,285 3 SI22PB: Modify signal phasing to implement a Leading Pedestrian Interval (LPI) $8,367,669
TOTAL $31,768,554

Appendix II: Pedestrian Crosswalk Set Aside

Cost Estimate

Priority Location Crosswalk Type RRFBs
Overhead
Flashing
Beacon
ADA Ramps Yield Bar
(ft)Ladder Crosswalk (ft)Pavement Markings (lane)Signs (LS)Bulb Outs (LS) Total
Construction
Cost
Contingency PS&E Construction
Engineering Total Cost
1 Downey Avenue at Our Lady of
Perpetual Help School
Our Lady of Perpetual Help
School Crosswalk 2 2 62 62 4 1 1 141,220.60$ 21,183.09$ 40,600.92$ 24,360.55$ 227,365.17$ 2 Gardendale Street at St.

Mathias Academy
St. Mathias Academy School
Crosswalk 2 1 50 58 2 1 64,655.00$ 9,698.25$ 18,588.31$ 11,152.99$ 104,094.55$ 3 Gardendale Street at Hoover
Avenue
St. Mathias Academy School
Crosswalk 2 1 50 58 2 1 64,655.00$ 9,698.25$ 18,588.31$ 11,152.99$ 104,094.55$ 4 Rives Avenue at Adwen Street Williams Elementary School Crosswalk 2 500.00$ 40 40 2 1 39,320.80$ 5,898.12$ 11,304.73$ 6,782.84$ 63,306.49$ 5 Conrad Street at Montgomery
Street St. Raymond School Crosswalk 2 5,500.00$ 40 40 2 1 44,320.80$ 6,648.12$ 12,742.23$ 7,645.34$ 71,356.49$ Unit Cost $17,500.00 $25,250.00 $1.00 $4.60 $29.90 $570.40 $1,300.00 $50,000.00

Appendix III: Systemic Bike Lane Corridor

HSIP Analyzer

HSIP Analyzer

Page 1 of 12 ends

Version date:April 2024
Application ID:

HSIP ANALYZER (for BCR Applications)
Benefit Cost Ratio (BCR) Calculation
for Highway Safety Improvement Program (HSIP) Application Important: Review and follow the step-by-step instructions in the HSIP Analyzer Manual. Completing the HSIP Analyzer without referencing to the manual may result in an application with fatal flaw s that will be disqualified from the ranking and selection process.

This is a dynamic form (i.e. later steps vary depending on the data entered in earlier steps). If any error messages appear, please fix the errors prior to proceeding to the next steps.

Save this file using "HA" +Application ID as the file name (e.g. "HA03-Sacramento-01.pdf").

Application ID, Project Location and Project Description (copy from the HSIP Application Form):

Section I: General Information
Application ID:

Install Bike Lanes along 4 corridors Project Description:
(limited to 250 characters)
Downey Ave, Old River School Road, Brookshire, & FosterProject Location:
(limited to 250 characters)
Number of Signalized Intersections:Number of Non-signalized Intersections:

Miles of Roadways*:*Do not include the length of the intersections that have been accounted for in the number of intersections above.

HSIP Analyzer

Page 6 of 12 ends

Version date:April 2024
Application ID:

Roadways (R):

Click the check box in the 1st column to select up to 3 countermeasures.

Hide unselected countermeasures View all countermeasures Select No.Countermeasure Name
1 R01NT: Add segment lighting (CRF=0.35 for Night crashes; Life=20 yrs; FE=90%) 2 R02: Remove or relocate fixed objects outside of Clear Recovery Zone (CRF=0.35 for All crashes; Life=20 yrs; FE=90%) 3 R03: Install Median Barrier (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 4 R04: Install Guardrail (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 5 R05: Install impact attenuators (CRF=0.25 for All crashes; Life=10 yrs; FE=90%) 6 R06: Flatten side slopes (CRF=0.3 for All crashes; Life=20 yrs; FE=90%) 7 R07: Flatten side slopes and remove guardrail (CRF=0.4 for All crashes; Life=20 yrs; FE=90%) 8 R08: Install raised median (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 9 R09: Install median (flush) (CRF=0.15 for All crashes; Life=20 yrs; FE=90%) 10 R10PB: Install pedestrian median fencing on approaches (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 11 R11: Install acceleration/ deceleration lanes (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 12 R12: Widen lane (initially less than 10 ft) (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 13 R13: Add two-way left-turn lane (CRF=0.3 for All crashes; Life=20 yrs; FE=90%) 14 R14: Road Diet (Reduce travel lanes and add a two way left-turn and bike lanes) (CRF=0.35 for All crashes; Life=20 yrs; FE=90%) 15 R15: Widen shoulder (CRF=0.3 for All crashes; Life=20 yrs; FE=90%) 16 R16: Curve Shoulder widening (Outside Only) (CRF=0.45 for All crashes; Life=20 yrs; FE=90%) 17 R17: Improve horizontal alignment (flatten curves) (CRF=0.5 for All crashes; Life=20 yrs; FE=90%) 18 R18: Flatten crest vertical curve (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 19 R19: Improve curve superelevation (CRF=0.45 for All crashes; Life=20 yrs; FE=90%) 20 R20: Convert from two-way to one-way traffic (CRF=0.35 for All crashes; Life=20 yrs; FE=90%) 21 R21: Improve pavement friction (High Friction Surface Treatments) (CRF=0.55 for All crashes; Life=10 yrs; FE=90%) 22 R22: Install/Upgrade signs with new fluorescent sheeting (regulatory or warning) (CRF=0.15 for All crashes; Life=10 yrs; FE=90%) 23 R23: Install chevron signs on horizontal curves (CRF=0.4 for All crashes; Life=10 yrs; FE=90%) 24 R24: Install curve advance warning signs (CRF=0.25 for All crashes; Life=10 yrs; FE=90%) 25 R25: Install curve advance warning signs (flashing beacon) (CRF=0.3 for All crashes; Life=10 yrs; FE=90%) 26 R26: Install dynamic/variable speed warning signs (CRF=0.3 for All crashes; Life=10 yrs; FE=90%) 27 R27: Install delineators, reflectors and/or object markers (CRF=0.15 for All crashes; Life=10 yrs; FE=90%) 28 R28: Install edge-lines and centerlines (CRF=0.25 for All crashes; Life=10 yrs; FE=90%) 29 R29: Install no-passing line (CRF=0.45 for All crashes; Life=10 yrs; FE=90%) 30 R30: Install centerline rumble strips/stripes (CRF=0.2 for All crashes; Life=10 yrs; FE=90%) 31 R31: Install edgeline rumble strips/stripes (CRF=0.15 for All crashes; Life=10 yrs; FE=90%) 32 R32: Speed Safety Cameras (CRF=0.2 for All crashes; Life=10 yrs; FE=90%) ✔33 R33PB: Install bike lanes (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 34 R34PB: Install Separated Bike Lanes (CRF=0.45 for Ped & Bike crashes; Life=20 yrs; FE=90%) 35 R35PB: Install sidewalk/pathway (to avoid walking along roadway) (CRF=0.8 for Ped & Bike crashes; Life=20 yrs; FE=90%) 36 R36PB: Install/upgrade pedestrian crossing (with enhanced safety features) (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 37 R37PB: Install raised pedestrian crossing (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 38 R38PB: Install Rectangular Rapid Flashing Beacon (RRFB) (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 39 R39AL: Install animal fencing (CRF=0.8 for Animal crashes; Life=20 yrs; FE=90%)

HSIP Analyzer

Page 7 of 12 ends

Version date:April 2024
Application ID:

Step 2: Click to generate table for project locations, enter the project locations and select countermeasures for each location. If any of the selections have been changed, you must re-click the below button to refresh.

Click to Generate Table for Project Locations Entry
CMs have been selected. Ok to proceed.
+/- Line Location
No.

Location Description
(Intersection Name or Road Limit or General Description) Click to select
Countermeasures
Error Messages
(must resolve)
(Roadway Segments)
R33PB
+
-R_1 Downey ●
+
-R_2 Old River School Road ●
+
-R_3 Brookshire ●
+
-R_4 Foster ●

HSIP Analyzer

Page 8 of 12 ends

Version date:April 2024
Application ID:

Step 3: Click to generate tables for crash data and provide crash data. If any changes have been made in the previous two steps, you must re-click to refresh.

Click to Generate Tables for Crash Data Entry
Crash Data Periods: you may use one or two time periods. The total time periods must be between 3 and 5 years.

The crash data to be entered are combined from both periods if two periods are used. from (MM/DD/YYYY):09/06/2020 To (MM/DD/YYYY):09/05/2023 Combined Crash Data Period (years) =3Fill out the crash data table(s) for the crash type(s) as required by the selected countermeasure(s) in Step 2.

Fill in yellow fields only. "Total" fields are calculated. Gray fields (if any) are locked as data are NOT needed for those fields.

To (MM/DD/YYYY):from (MM/DD/YYYY):

Crash Data Period 1:

Crash Data Period 2 :

Crash Data Table for Crash Type: Pedestrians and Bicyclists Involved (P&B) No.Location No : Description
(from Step 2)
Fatal
(P&B)
Severe Injury
(P&B) Other Visible
Injury (P&B)
Complaint
of Pain
(P&B)
PDO
(P&B)Total1
R_1: Downey1024072
R_2: Old River School Road0000003
R_3: Brookshire0000004
R_4: Foster000000
Total102407

HSIP Analyzer

Page 9 of 12 ends

Version date:April 2024
Application ID:

Step 4: Click to Calculate the project benefit. If any changes have been made in the previous two steps, you must re-click to refresh.

Click to Perform Benefit Calculation Benefit Summary:

Benefit by Locations
Location No : Description [CM1 ID][CM1] Benefit [CM2 ID][CM2] Benefit [CM3 ID][CM3] Benefit Total Benefit R_1: Downey [R33PB] $8,884,114 [None] $0 [None] $0 $8,884,114 R_2: Old River School Road [R33PB] $0 [None] $0 [None] $0 $0 R_3: Brookshire [R33PB] $0 [None] $0 [None] $0 $0
R_4: Foster [R33PB] $0 [None] $0 [None] $0 $0
Total $8,884,114

Benefit by Countermeasures
No.Countermeasure Benefit
1 R33PB: Install bike lanes $8,884,114
TOTAL $8,884,114

Appendix IV: Systemic Traffic Signal Improvement Project

HSIP Analyzer

HSIP Analyzer

Page 1 of 11 ends

Version date:April 2024
Application ID:

HSIP ANALYZER (for BCR Applications)
Benefit Cost Ratio (BCR) Calculation
for Highway Safety Improvement Program (HSIP) Application Important: Review and follow the step-by-step instructions in the HSIP Analyzer Manual. Completing the HSIP Analyzer without referencing to the manual may result in an application with fatal flaw s that will be disqualified from the ranking and selection process.

This is a dynamic form (i.e. later steps vary depending on the data entered in earlier steps). If any error messages appear, please fix the errors prior to proceeding to the next steps.

Save this file using "HA" +Application ID as the file name (e.g. "HA03-Sacramento-01.pdf").

Application ID, Project Location and Project Description (copy from the HSIP Application Form):

Section I: General Information
Application ID:
upgrade signal hardwareProject Description:
(limited to 250 characters)
12 intersections citywideProject Location:
(limited to 250 characters)
Number of Signalized Intersections:Number of Non-signalized Intersections:

Miles of Roadways*:*Do not include the length of the intersections that have been accounted for in the number of intersections above.

HSIP Analyzer

Page 5 of 11 ends

Version date:April 2024
Application ID:

Step 1: Select safety countermeasures
Does this application include Signalized Intersections (SI)?Yes Does this application include Non-signalized Intersections (NS)? Does this application include Roadway Segments (R)?
* Normally a BCR application only includes locations of one of the above 3 categories (SI, NS or R). Multiple categories may be selected if the application proposes corridor safety improvements or uses a systemic approach, or the applicant chooses to bundle multiple locations in the same vicinity together.

Signalized Intersections (SI):

Click the check box in the 1st column to select up to 3 countermeasures.

Hide unselected countermeasures View all countermeasures Select No.Countermeasure Name
1 SI01NT: Add intersection lighting (S.I.) (CRF=0.4 for Night crashes; Life=20 yrs; FE=90%) ✔2 SI02: Improve signal hardware: lenses, back-plates with retroreflective borders, mounting, size, and number (CRF=0.15 for All crashes; Life=10 yrs; FE=90%)
3 SI03: Improve signal timing (coordination, phases, red, yellow, or operation) (CRF=0.15 for All crashes; Life=10 yrs; FE=50%) 4 SI04EV: Install emergency vehicle pre-emption systems (CRF=0.7 for Emergency vehicle crashes; Life=10 yrs; FE=90%) 5 SI05: Install left-turn lane and add turn phase (signal has no left-turn lane or phase before) (CRF=0.55 for All crashes; Life=20 yrs; FE=90%) 6 SI06: Provide protected left turn phase (left turn lane already exists) (CRF=0.3 for All crashes; Life=20 yrs; FE=90%) 7 SI07: Convert signal to mast arm (from pedestal-mounted) (CRF=0.3 for All crashes; Life=20 yrs; FE=90%) 8 SI08: Install raised pavement markers and striping (through intersection) (CRF=0.1 for All crashes; Life=10 yrs; FE=90%) 9 SI09: Install flashing beacons as advance warning (S.I.) (CRF=0.3 for All crashes; Life=10 yrs; FE=90%) 10 SI10: Improve pavement friction (High Friction Surface Treatments) (CRF=0.55 for All crashes; Life=10 yrs; FE=90%) 11 SI11: Install raised median on approaches (S.I.) (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 12 SI12PB: Install pedestrian median fencing on approaches (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 13 SI13: Create directional median openings to allow (and restrict) left-turns and u-turns (S.I.) (CRF=0.5 for All crashes; Life=20 yrs; FE=90%) 14 SI14: Install right-turn lane (S.I.) (CRF=0.15 for All crashes; Life=20 yrs; FE=90%) 15 SI15: Reduced Left-Turn Conflict Intersections (S.I.) (CRF=0.5 for All crashes; Life=20 yrs; FE=90%) 16 SI16RA: Convert intersection to roundabout (from signal) (CRF varies for All crashes; Life=20 yrs; FE=90%) 17 SI17RA: Convert intersection to compact roundabout (from signal) (CRF varies for All crashes; Life=20 yrs; FE=90%) 18 SI18PB: Install pedestrian countdown signal heads (CRF=0.25 for Ped & Bike crashes; Life=20 yrs; FE=90%) 19 SI19PB: Install pedestrian crossing (S.I.) (CRF=0.25 for Ped & Bike crashes; Life=20 yrs; FE=90%) 20 SI20PB: Pedestrian Scramble (CRF=0.4 for Ped & Bike crashes; Life=20 yrs; FE=90%) 21 SI21PB: Install advance stop bar before crosswalk (Bicycle Box) (CRF=0.15 for Ped & Bike crashes; Life=10 yrs; FE=90%) 22 SI22PB: Modify signal phasing to implement a Leading Pedestrian Interval (LPI) (CRF=0.6 for Ped & Bike crashes; Life=10 yrs; FE=90%)

HSIP Analyzer

Page 6 of 11 ends

Version date:April 2024
Application ID:

Step 2: Click to generate table for project locations, enter the project locations and select countermeasures for each location. If any of the selections have been changed, you must re-click the below button to refresh.

Click to Generate Table for Project Locations Entry
CMs have been selected. Ok to proceed.
+/- Line Location
No.

Location Description
(Intersection Name or Road Limit or General Description) Click to select
Countermeasures
Error Messages
(must resolve)
(Signalized Intersections)
SI02
+
-SI_1 Suva & Bluff ●
+
-SI_2 Downey & 5th ●
+
-SI_3 Downey & Alameda ●
+
-SI_4 Brookshire & 5th ●
+
-SI_5 Brookshire & 3rd ●
+
-SI_6 Brookshire & Iowa ●
+
-SI_7 Brookshire & Alameda ●
+
-SI_8 Brookshire & Gardendale ●
+
-SI_9 Gardendale & Barlin ●
+
-SI_10 Gardendale & Paramount ●
+
-SI_11 Columbia & Adoree ●
+
-SI_12 Columbia & Foster ●

HSIP Analyzer

Page 7 of 11 ends

Version date:April 2024
Application ID:

Step 3: Click to generate tables for crash data and provide crash data. If any changes have been made in the previous two steps, you must re-click to refresh.

Click to Generate Tables for Crash Data Entry
Crash Data Periods: you may use one or two time periods. The total time periods must be between 3 and 5 years.

The crash data to be entered are combined from both periods if two periods are used. from (MM/DD/YYYY):01/17/2020 To (MM/DD/YYYY):11/27/2023 Combined Crash Data Period (years) =3.86
Fill out the crash data table(s) for the crash type(s) as required by the selected countermeasure(s) in Step 2.

Fill in yellow fields only. "Total" fields are calculated. Gray fields (if any) are locked as data are NOT needed for those fields.

To (MM/DD/YYYY):from (MM/DD/YYYY):

Crash Data Period 1:

Crash Data Period 2 :

Crash Data Table for Crash Type: ALL
No.Location No : Description
(from Step 2)
Fatal
(ALL)
Severe
Injury (ALL) Other Visible
Injury (ALL)
Complaint
of Pain
(ALL)
PDO
(ALL)Total1
SI_1: Suva & Bluff0001232
SI_2: Downey & 5th0000003
SI_3: Downey & Alameda0022594
SI_4: Brookshire & 5th00424105
SI_5: Brookshire & 3rd0000116
SI_6: Brookshire & Iowa0100237
SI_7: Brookshire & Alameda0016188
SI_8: Brookshire & Gardendale0014169
SI_9: Gardendale & Barlin00012310
SI_10: Gardendale & Paramount103701111
SI_11: Columbia & Adoree00000012
SI_12: Columbia & Foster001124
Total1112 24 2058

HSIP Analyzer

Page 8 of 11 ends

Version date:April 2024
Application ID:

Step 4: Click to Calculate the project benefit. If any changes have been made in the previous two steps, you must re-click to refresh.

Click to Perform Benefit Calculation Benefit Summary:

Benefit by Locations
Location No : Description [CM1 ID][CM1] Benefit [CM2 ID][CM2] Benefit [CM3 ID][CM3] Benefit Total Benefit SI_1: Suva & Bluff [SI02] $56,692 [None] $0 [None] $0 $56,692 SI_2: Downey & 5th [SI02] $0 [None] $0 [None] $0 $0
SI_3: Downey & Alameda [SI02] $270,256 [None] $0 [None] $0 $270,256 SI_4: Brookshire & 5th [SI02] $413,149 [None] $0 [None] $0 $413,149 SI_5: Brookshire & 3rd [SI02] $6,990 [None] $0 [None] $0 $6,990 SI_6: Brookshire & Iowa [SI02] $853,479 [None] $0 [None] $0 $853,479 SI_7: Brookshire & Alameda [SI02] $338,208 [None] $0 [None] $0 $338,208 SI_8: Brookshire & Gardendale [SI02] $252,782 [None] $0 [None] $0 $252,782 SI_9: Gardendale & Barlin [SI02] $56,692 [None] $0 [None] $0 $56,692 SI_10: Gardendale & Paramount [SI02] $1,363,314 [None] $0 [None] $0 $1,363,314 SI_11: Columbia & Adoree [SI02] $0 [None] $0 [None] $0 $0 SI_12: Columbia & Foster [SI02] $131,633 [None] $0 [None] $0 $131,633 Total $3,743,195

Benefit by Countermeasures
No.Countermeasure Benefit
1 SI02: Improve signal hardware: lenses, back-plates with retroreflective borders, mounting, size, and number $3,743,195 TOTAL $3,743,195

HSIP Analyzer

Page 1 of 11 ends

Version date:April 2024
Application ID:

HSIP ANALYZER (for BCR Applications)
Benefit Cost Ratio (BCR) Calculation
for Highway Safety Improvement Program (HSIP) Application Important: Review and follow the step-by-step instructions in the HSIP Analyzer Manual. Completing the HSIP Analyzer without referencing to the manual may result in an application with fatal flaw s that will be disqualified from the ranking and selection process.

This is a dynamic form (i.e. later steps vary depending on the data entered in earlier steps). If any error messages appear, please fix the errors prior to proceeding to the next steps.

Save this file using "HA" +Application ID as the file name (e.g. "HA03-Sacramento-01.pdf").

Application ID, Project Location and Project Description (copy from the HSIP Application Form):

Section I: General Information
Application ID:
install left-turn phasingProject Description:
(limited to 250 characters)
8 of the top 10 intersections from the LRSPProject Location:
(limited to 250 characters)
Number of Signalized Intersections:8 Number of Non-signalized Intersections:

Miles of Roadways*:*Do not include the length of the intersections that have been accounted for in the number of intersections above.

HSIP Analyzer

Page 5 of 11 ends

Version date:April 2024
Application ID:

Step 1: Select safety countermeasures
Does this application include Signalized Intersections (SI)?Yes Does this application include Non-signalized Intersections (NS)? Does this application include Roadway Segments (R)?
* Normally a BCR application only includes locations of one of the above 3 categories (SI, NS or R). Multiple categories may be selected if the application proposes corridor safety improvements or uses a systemic approach, or the applicant chooses to bundle multiple locations in the same vicinity together.

Signalized Intersections (SI):

Click the check box in the 1st column to select up to 3 countermeasures.

Hide unselected countermeasures View all countermeasures Select No.Countermeasure Name
1 SI01NT: Add intersection lighting (S.I.) (CRF=0.4 for Night crashes; Life=20 yrs; FE=90%) 2 SI02: Improve signal hardware: lenses, back-plates with retroreflective borders, mounting, size, and number (CRF=0.15 for All crashes; Life=10 yrs; FE=90%)
3 SI03: Improve signal timing (coordination, phases, red, yellow, or operation) (CRF=0.15 for All crashes; Life=10 yrs; FE=50%) 4 SI04EV: Install emergency vehicle pre-emption systems (CRF=0.7 for Emergency vehicle crashes; Life=10 yrs; FE=90%) 5 SI05: Install left-turn lane and add turn phase (signal has no left-turn lane or phase before) (CRF=0.55 for All crashes; Life=20 yrs; FE=90%) ✔6 SI06: Provide protected left turn phase (left turn lane already exists) (CRF=0.3 for All crashes; Life=20 yrs; FE=90%) 7 SI07: Convert signal to mast arm (from pedestal-mounted) (CRF=0.3 for All crashes; Life=20 yrs; FE=90%) 8 SI08: Install raised pavement markers and striping (through intersection) (CRF=0.1 for All crashes; Life=10 yrs; FE=90%) 9 SI09: Install flashing beacons as advance warning (S.I.) (CRF=0.3 for All crashes; Life=10 yrs; FE=90%) 10 SI10: Improve pavement friction (High Friction Surface Treatments) (CRF=0.55 for All crashes; Life=10 yrs; FE=90%) 11 SI11: Install raised median on approaches (S.I.) (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 12 SI12PB: Install pedestrian median fencing on approaches (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 13 SI13: Create directional median openings to allow (and restrict) left-turns and u-turns (S.I.) (CRF=0.5 for All crashes; Life=20 yrs; FE=90%) 14 SI14: Install right-turn lane (S.I.) (CRF=0.15 for All crashes; Life=20 yrs; FE=90%) 15 SI15: Reduced Left-Turn Conflict Intersections (S.I.) (CRF=0.5 for All crashes; Life=20 yrs; FE=90%) 16 SI16RA: Convert intersection to roundabout (from signal) (CRF varies for All crashes; Life=20 yrs; FE=90%) 17 SI17RA: Convert intersection to compact roundabout (from signal) (CRF varies for All crashes; Life=20 yrs; FE=90%) 18 SI18PB: Install pedestrian countdown signal heads (CRF=0.25 for Ped & Bike crashes; Life=20 yrs; FE=90%) 19 SI19PB: Install pedestrian crossing (S.I.) (CRF=0.25 for Ped & Bike crashes; Life=20 yrs; FE=90%) 20 SI20PB: Pedestrian Scramble (CRF=0.4 for Ped & Bike crashes; Life=20 yrs; FE=90%) 21 SI21PB: Install advance stop bar before crosswalk (Bicycle Box) (CRF=0.15 for Ped & Bike crashes; Life=10 yrs; FE=90%) 22 SI22PB: Modify signal phasing to implement a Leading Pedestrian Interval (LPI) (CRF=0.6 for Ped & Bike crashes; Life=10 yrs; FE=90%)

HSIP Analyzer

Page 6 of 11 ends

Version date:April 2024
Application ID:

Step 2: Click to generate table for project locations, enter the project locations and select countermeasures for each location. If any of the selections have been changed, you must re-click the below button to refresh.

Click to Generate Table for Project Locations Entry
CMs have been selected. Ok to proceed.
+/- Line Location
No.

Location Description
(Intersection Name or Road Limit or General Description) Click to select
Countermeasures
Error Messages
(must resolve)
(Signalized Intersections)
SI06
+
-SI_1 Downey Ave & Firestone Blvd ●
+
-SI_2 Florence & Woodruff ●
+
-SI_3 Firestone Blvd & Rives Ave ●
+
-SI_4 Paramount Blvd & Telegraph ●
+
-SI_5 Downey & Gardendale ●
+
-SI_6 Paramount & Florence ●
+
-SI_7 Firestone & Ryerson ●

HSIP Analyzer

Page 7 of 11 ends

Version date:April 2024
Application ID:

Step 3: Click to generate tables for crash data and provide crash data. If any changes have been made in the previous two steps, you must re-click to refresh.

Click to Generate Tables for Crash Data Entry
Crash Data Periods: you may use one or two time periods. The total time periods must be between 3 and 5 years.

The crash data to be entered are combined from both periods if two periods are used. from (MM/DD/YYYY):01/01/2020 To (MM/DD/YYYY):12/31/2023 Combined Crash Data Period (years) =4Fill out the crash data table(s) for the crash type(s) as required by the selected countermeasure(s) in Step 2.

Fill in yellow fields only. "Total" fields are calculated. Gray fields (if any) are locked as data are NOT needed for those fields.

To (MM/DD/YYYY):from (MM/DD/YYYY):

Crash Data Period 1:

Crash Data Period 2 :

Crash Data Table for Crash Type: ALL
No.Location No : Description
(from Step 2)
Fatal
(ALL)
Severe
Injury (ALL) Other Visible
Injury (ALL)
Complaint
of Pain
(ALL)
PDO
(ALL)Total1
SI_1: Downey Ave & Firestone
Blvd02312 20 372
SI_2: Florence & Woodruff20382153
SI_3: Firestone Blvd & Rives
Ave1041310 284
SI_4: Paramount Blvd &
Telegraph014116 225
SI_5: Downey & Gardendale01472146
SI_6: Paramount & Florence006 2016427
SI_7: Firestone & Ryerson1044413
Total44 287560 171

HSIP Analyzer

Page 8 of 11 ends

Version date:April 2024
Application ID:

Step 4: Click to Calculate the project benefit. If any changes have been made in the previous two steps, you must re-click to refresh.

Click to Perform Benefit Calculation Benefit Summary:

Benefit by Locations
Location No : Description [CM1 ID][CM1] Benefit [CM2 ID][CM2] Benefit [CM3 ID][CM3] Benefit Total Benefit SI_1: Downey Ave & Firestone
Blvd [SI06] $9,874,501 [None] $0 [None] $0 $9,874,501
SI_2: Florence & Woodruff [SI06] $8,728,501 [None] $0 [None] $0 $8,728,501 SI_3: Firestone Blvd & Rives Ave [SI06] $6,816,001 [None] $0 [None] $0 $6,816,001 SI_4: Paramount Blvd &
Telegraph [SI06] $6,378,001 [None] $0 [None] $0 $6,378,001 SI_5: Downey & Gardendale [SI06] $5,610,001 [None] $0 [None] $0 $5,610,001 SI_6: Paramount & Florence [SI06] $5,469,001 [None] $0 [None] $0 $5,469,001 SI_7: Firestone & Ryerson [SI06] $5,169,001 [None] $0 [None] $0 $5,169,001 Total $48,045,007

Benefit by Countermeasures
No.Countermeasure Benefit
1 SI06: Provide protected left turn phase (left turn lane already exists) $48,045,007 TOTAL $48,045,007

Appendix V: Florence Median Project

HSIP Analyzer

HSIP Analyzer

Page 1 of 12 ends

Version date:April 2024
Application ID:

HSIP ANALYZER (for BCR Applications)
Benefit Cost Ratio (BCR) Calculation
for Highway Safety Improvement Program (HSIP) Application Important: Review and follow the step-by-step instructions in the HSIP Analyzer Manual. Completing the HSIP Analyzer without referencing to the manual may result in an application with fatal flaw s that will be disqualified from the ranking and selection process.

This is a dynamic form (i.e. later steps vary depending on the data entered in earlier steps). If any error messages appear, please fix the errors prior to proceeding to the next steps.

Save this file using "HA" +Application ID as the file name (e.g. "HA03-Sacramento-01.pdf").

Application ID, Project Location and Project Description (copy from the HSIP Application Form):

Section I: General Information
Application ID:

Install raised mediansProject Description:
(limited to 250 characters)
Florence between Vultee and WoodruffProject Location:
(limited to 250 characters)
Number of Signalized Intersections:Number of Non-signalized Intersections:

Miles of Roadways*:*Do not include the length of the intersections that have been accounted for in the number of intersections above.

HSIP Analyzer

Page 6 of 12 ends

Version date:April 2024
Application ID:

Roadways (R):

Click the check box in the 1st column to select up to 3 countermeasures.

Hide unselected countermeasures View all countermeasures Select No.Countermeasure Name
1 R01NT: Add segment lighting (CRF=0.35 for Night crashes; Life=20 yrs; FE=90%) 2 R02: Remove or relocate fixed objects outside of Clear Recovery Zone (CRF=0.35 for All crashes; Life=20 yrs; FE=90%) 3 R03: Install Median Barrier (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 4 R04: Install Guardrail (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 5 R05: Install impact attenuators (CRF=0.25 for All crashes; Life=10 yrs; FE=90%) 6 R06: Flatten side slopes (CRF=0.3 for All crashes; Life=20 yrs; FE=90%) 7 R07: Flatten side slopes and remove guardrail (CRF=0.4 for All crashes; Life=20 yrs; FE=90%) ✔8 R08: Install raised median (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 9 R09: Install median (flush) (CRF=0.15 for All crashes; Life=20 yrs; FE=90%) 10 R10PB: Install pedestrian median fencing on approaches (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 11 R11: Install acceleration/ deceleration lanes (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 12 R12: Widen lane (initially less than 10 ft) (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 13 R13: Add two-way left-turn lane (CRF=0.3 for All crashes; Life=20 yrs; FE=90%) 14 R14: Road Diet (Reduce travel lanes and add a two way left-turn and bike lanes) (CRF=0.35 for All crashes; Life=20 yrs; FE=90%) 15 R15: Widen shoulder (CRF=0.3 for All crashes; Life=20 yrs; FE=90%) 16 R16: Curve Shoulder widening (Outside Only) (CRF=0.45 for All crashes; Life=20 yrs; FE=90%) 17 R17: Improve horizontal alignment (flatten curves) (CRF=0.5 for All crashes; Life=20 yrs; FE=90%) 18 R18: Flatten crest vertical curve (CRF=0.25 for All crashes; Life=20 yrs; FE=90%) 19 R19: Improve curve superelevation (CRF=0.45 for All crashes; Life=20 yrs; FE=90%) 20 R20: Convert from two-way to one-way traffic (CRF=0.35 for All crashes; Life=20 yrs; FE=90%) 21 R21: Improve pavement friction (High Friction Surface Treatments) (CRF=0.55 for All crashes; Life=10 yrs; FE=90%) 22 R22: Install/Upgrade signs with new fluorescent sheeting (regulatory or warning) (CRF=0.15 for All crashes; Life=10 yrs; FE=90%) 23 R23: Install chevron signs on horizontal curves (CRF=0.4 for All crashes; Life=10 yrs; FE=90%) 24 R24: Install curve advance warning signs (CRF=0.25 for All crashes; Life=10 yrs; FE=90%) 25 R25: Install curve advance warning signs (flashing beacon) (CRF=0.3 for All crashes; Life=10 yrs; FE=90%) 26 R26: Install dynamic/variable speed warning signs (CRF=0.3 for All crashes; Life=10 yrs; FE=90%) 27 R27: Install delineators, reflectors and/or object markers (CRF=0.15 for All crashes; Life=10 yrs; FE=90%) 28 R28: Install edge-lines and centerlines (CRF=0.25 for All crashes; Life=10 yrs; FE=90%) 29 R29: Install no-passing line (CRF=0.45 for All crashes; Life=10 yrs; FE=90%) 30 R30: Install centerline rumble strips/stripes (CRF=0.2 for All crashes; Life=10 yrs; FE=90%) 31 R31: Install edgeline rumble strips/stripes (CRF=0.15 for All crashes; Life=10 yrs; FE=90%) 32 R32: Speed Safety Cameras (CRF=0.2 for All crashes; Life=10 yrs; FE=90%) 33 R33PB: Install bike lanes (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 34 R34PB: Install Separated Bike Lanes (CRF=0.45 for Ped & Bike crashes; Life=20 yrs; FE=90%) 35 R35PB: Install sidewalk/pathway (to avoid walking along roadway) (CRF=0.8 for Ped & Bike crashes; Life=20 yrs; FE=90%) 36 R36PB: Install/upgrade pedestrian crossing (with enhanced safety features) (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 37 R37PB: Install raised pedestrian crossing (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 38 R38PB: Install Rectangular Rapid Flashing Beacon (RRFB) (CRF=0.35 for Ped & Bike crashes; Life=20 yrs; FE=90%) 39 R39AL: Install animal fencing (CRF=0.8 for Animal crashes; Life=20 yrs; FE=90%)

HSIP Analyzer

Page 7 of 12 ends

Version date:April 2024
Application ID:

Step 2: Click to generate table for project locations, enter the project locations and select countermeasures for each location. If any of the selections have been changed, you must re-click the below button to refresh.

Click to Generate Table for Project Locations Entry
CMs have been selected. Ok to proceed.
+/- Line Location
No.

Location Description
(Intersection Name or Road Limit or General Description) Click to select
Countermeasures
Error Messages
(must resolve)
(Roadway Segments)
R08
+
-R_1 Florence ●

HSIP Analyzer

Page 8 of 12 ends

Version date:April 2024
Application ID:

Step 3: Click to generate tables for crash data and provide crash data. If any changes have been made in the previous two steps, you must re-click to refresh.

Click to Generate Tables for Crash Data Entry
Crash Data Periods: you may use one or two time periods. The total time periods must be between 3 and 5 years.

The crash data to be entered are combined from both periods if two periods are used. from (MM/DD/YYYY):07/03/2016 To (MM/DD/YYYY):09/14/2019 Combined Crash Data Period (years) =4.6
Fill out the crash data table(s) for the crash type(s) as required by the selected countermeasure(s) in Step 2.

Fill in yellow fields only. "Total" fields are calculated. Gray fields (if any) are locked as data are NOT needed for those fields.

To (MM/DD/YYYY):06/01/2023from (MM/DD/YYYY):01/05/2022
Crash Data Period 1:

Crash Data Period 2 :

Crash Data Table for Crash Type: ALL
No.Location No : Description
(from Step 2)
Fatal
(ALL)
Severe
Injury (ALL) Other Visible
Injury (ALL)
Complaint
of Pain
(ALL)
PDO
(ALL)Total1
R_1: Florence123811 25
Total123811 25

HSIP Analyzer

Page 9 of 12 ends

Version date:April 2024
Application ID:

Step 4: Click to Calculate the project benefit. If any changes have been made in the previous two steps, you must re-click to refresh.

Click to Perform Benefit Calculation Benefit Summary:

Benefit by Locations
Location No : Description [CM1 ID][CM1] Benefit [CM2 ID][CM2] Benefit [CM3 ID][CM3] Benefit Total Benefit R_1: Florence [R08] $11,505,105 [None] $0 [None] $0 $11,505,105 Total $11,505,105

Benefit by Countermeasures
No.Countermeasure Benefit
1 R08: Install raised median $11,505,105
TOTAL $11,505,105

Appendix VI: Task Force Meeting Minutes and Agenda

Task Force Meeting Agenda
Task Force Meeting Minutes

Downey LRSP
Countermeasure and Project Review
Meeting Agenda
September 2021, 2021

- Top Intersections Review
- Countermeasure Selection Review
- Next Steps
o Core Team meetings. Incorporate stakeholders from the following:

▪ Police Department
▪ Fire Department
▪ School Districts
▪ Parks and Recreation Department
▪ Bike Coalition
▪ Community Development Department
▪ PIH Hospital or Keiser Permanente
o Draft Report

TOP 15 INTERSECTIONS -

HIGHEST WEIGHTED COLLISION SEVERITY
No. MAJOR

ROADWAY
MINOR

ROADWAY
NUMBER
OF

COLLISIONS

WEIGHTED
VALUE

COLLISION
TYPES

PRIMARY COLLISION

FACTORS
OTHER

NOTABLE
TRENDS

CITY COMMENTS COMMENTS
1 Lakewood
Boulevard
Stewart and
Gray Road 68 753
57% Broadside,
31% Rear End
34% Automobile Right
of Way, 24% Unsafe
Speed There is a CIP project in progress for fully protected phasing No upgrades needed 2 Lakewood
Boulevard
Firestone
Boulevard 112 707
42% Broadside,
21% Rear End
37% Automobile Right
of Way
There is a project in the works for northbound and southbound left turn lanes and fully protected phasing funded through the hot spots project
over capacity, in need of protected left
turn phasing (will be funded through
Metro)
3 Telegraph
Road
Paramount
Boulevard 39 594 62% Broadside
45% Automobile Right
of Way
The controller is being upgraded to a 2070 controller. This location is a part of the Paramount HSIP project
weathered signal hardware & video
detection
4 Downey
Avenue
Imperial
Highway 55 575 62% Broadside
29% Automobile Right
of Way, 24% Traffic
Singals/ Signs
HSIP on Imperial Highway is upgrading this intersection to fully protected left turn phasing No upgrades needed
5 Florence
Avenue Lakewood Blvd 73 533
41% Broadside,
33% Rear-End
33% Automobile Right
of Way, 22% Unsafe
Speed
year
trends:
2015:15,
2016:14,
2017:25,
2018:8,
2019:11
a project is in the works at this location and the intersection already has fully protected left turn phasing added in 2015 or 2016. a. Did this improvement drop the crash trend from 2016- 2020? No upgrades needed 6 Bellflower
Boulevard
Imperial
Highway 49 424
33% Broadside,
31%Rear-End
22% Improper Turning,
Unknown, 20% Unsafe
Speed, 20% Unknown all is done that can be done at this intersection No upgrades needed 7 Brookshire
Avenue
Imperial
Highway 38 363 58% Broadside
41% Automobile Right
of Way fully protected left turn phasing project is in the works No upgrades needed 8 Firestone
Boulevard Dolan Avenue 25 350
44% Broadside,
28% Rear-End
33% Automobile Right
of Way, 29% Unsafe
Speed
nothing is in the works at this location. This location can use some hardware improvements
small signal hardware & video
detection
9 Bellflower
Boulevard
Stewart and
Gray Road 38 333 50% Broadside
37% Automobile Right
of Way
nothing substantial has been done here recently. Has recently upgraded the controller and battery backup No upgrades needed 10 Paramount
Boulevard
Stewart and
Gray Road 46 331
43% Broadside,
28% Rear End
28% Automobile Right
of Way, 20% Unsafe
Speed This intersection is part of the Paramount HSIP project No upgrades needed

TOP 15 INTERSECTIONS -

HIGHEST WEIGHTED COLLISION SEVERITY
No. MAJOR

ROADWAY
MINOR

ROADWAY
NUMBER
OF

COLLISIONS

WEIGHTED
VALUE

COLLISION
TYPES

PRIMARY COLLISION

FACTORS
OTHER

NOTABLE
TRENDS

CITY COMMENTS COMMENTS
11 Florence
Avenue
Old River
School Road 26 271 42% Broadside
28% Automobile Right
of Way, 28% Improper
Turning
year
trends:
2015:12,
2016:2,
2017:6,
2018:1,
2019:5
Poles, vehicle heads, services, curb ramps, and controllers updated in 2015 or 2016 No upgrades needed
12 Imperial
Highway Lakewood Blvd 56 256 43% Rear End 31% Unsafe Speed Improvements are in the works through the hot spots project.

Double left turn lanes on Imperial Highway and coordinated signals No upgrades needed 13 Imperial
Highway Columbia Way 39 234
54% Broadside,
28% Rear End
49% Automobile Right
of Way, 21% Unsafe
Speed protected permissive phasing currently No upgrades needed 14 Imperial
Highway
Paramount
Boulevard 47 217 45% Rear End 23% Unsafe Speed
project is in the works using I-710 early action. Double left turn lanes for the Southbound and Westbound directions. Plans to widen the south side of Imperial Highway for a wider receiving lane for safer U- turns No upgrades needed
15 Florence
Avenue
Little Lake
Road 31 166
42% Broadside,
23% Sideswipe 35% Unknown Caltrans maintained intersection caltrans signal

TOP 21 SEGMENTS-

HIGHEST WEIGHTED COLLISION SEVERITY
No PRIMARY

ROAD SEGMENT NUMBER OF

COLLISIONS

WEIGHTED
VALUE

SEGMENT
LENGTH
(MI)

WEIGHTED
VALUE/
MILE

COLLISION
TYPES

PRIMARY

COLLISION

FACTORS
OTHER

TRENDS CITY COMMENTS
1 Firestone
Boulevard
City Limit to
City Limit 373 3078 3.25 947.08
34% Rear
End, 27%
Broadside
27% Auto
Right Of Way,
25% Unsafe
Speed, 20%
Improper
Turning
Good project opportunity- signal upgrades & speed feedback signs. --Medians constructed 8 years ago. Lakewood Boulevard to Old River School Road has some median openings. Closing these median openings could be an option if there is a collision history at the openings. --The signals on Firestone Boulevard are fully protected.-- Downey High School is on Firestone at Patton with high ped volume.

Look into left turn phasing or split phasing at Firestone/Patton. 2 Lakewood
Boulevard
City Limit to
City Limit 319 2529 3.94 641.88
52% Rear
End
43% Unsafe
Speed Not sure what can be done
3 Florence
Avenue
City Limit to
City Limit 259 2099 3.43 611.95
36% Rear
End, 33%
Broadside
28% Unsafe
Speed, 28%
Auto Right of
Way
No medians at all- City is open to a median project here -- A complete streets project is in the works by the Gateway Cities COG-- road gets congested at Paramount Boulevard-- no room for a second left turn lane at the freeway intersection
4 De Palma
Street
Paramount
Boulevard to
Gurley Avenue 4 144 0.24 600.00
75%
Sideswipe,
25% Hit
Object
25% Unsafe
Starting and
Backing, 25%
Unsafe Speed,
25% Auto
ROW, 25%
Improper
Turning
1 Bicycle
Collision
Next to Warran high School- fatality came from a student racing their car and hit a tree
5 Bellflower
Boulevard
Stewart & Gray
to Dalen Street 54 474 0.87 544.83
31% Rear
End, 26% Hit
Object
37% Improper
Turning, 25%
Unsafe Speed
26% Hit Object
Collisions Crosses Imperial Highway and runs near Kaiser--not sure what can be done here 6 Imperial
Highway
Old River
School Road to
Woodruff
Avenue 213 1278 2.79 458.06
38% Rear
End, 21% Hit
Object
29% Unsafe
Speed, 25%
Improper
Turning City has done all they can do on Imperial

TOP 21 SEGMENTS-

HIGHEST WEIGHTED COLLISION SEVERITY
No PRIMARY

ROAD SEGMENT NUMBER OF

COLLISIONS

WEIGHTED
VALUE

SEGMENT
LENGTH
(MI)

WEIGHTED
VALUE/
MILE

COLLISION
TYPES

PRIMARY

COLLISION

FACTORS
OTHER

TRENDS CITY COMMENTS
7 Stewart &
Gray Road
West City Limit
to Firestone
Boulevard 168 1423 3.15 451.75
34% Rear
End, 23%
Sideswipe,
23%
Broadside
30% Improper
Turning, 24%
Unsafe Speed,
21% Auto
ROW Project in the works to upgrade signalized intersections and coordination 8 Brookshire
Avenue
Manatee Street
to 5th Street 23 243 0.64 379.69
39%
Broadside
52% Auto
Right of Way Crosses Firestone, PIH and Downey High School 9 Foster Road
Bellflower
Boulevard to
East End 10 300 0.81 370.37
20%
Broadside,
20% Hit
Object, 20%
Rear End,
20%
Sideswipe
33% Improper
Turning, 22%
Unsafe Speed,
22% Unknown
20% Ped/Bike
Collisions
Cross elementary schools along this stretch- are there any ped/school improvements here? -- Look into a lane reduction + bike lane project here while maintaining on-street parking (would need to get Bellflower involved and on-board) 10 Paramount
Boulevard
City Limit to
City Limit 247 1637 4.64 352.80
41% Rear
End, 23%
Broadside,
21%
Sideswipe
28% Unsafe
Speed, 27%
Improper
Turning
year trends:
2015:69,
2016:58,
2017:33,
2018:44,
2019:43
Done a lot here recently-- medians between Imperial and Firestone and between Firestone and Florence -- HSIP Project is under construction now -- new traffic signal by the High School on De Palma
11 Brookshire
Avenue
Imperial
Highway to
Stewart & Gray 27 252 0.88 286.36
44%
Sideswipe,
26%
Broadside
54% Improper
Turning
33% Collisions
with Parked
Motor Vehicles
City is considering lane reductions and bike lanes here -- Have already done the lane reductions between Imperial Highway and Gardendale Street 12 Telegraph
Road
City Limit to
City Limit 72 622 2.24 277.68
26% Rear
End, 24%
Sideswipe,
24%
Broadside
27% Unsafe
Speed, 27%
Auto ROW,
25% Improper
Turning
Project under construction with City of Pico Rivera for raised medians between Passons and the East City Limit, pavement upgrades, and Birch Park and True Ave signal upgrades with protected permissive left turn phasing.

TOP 21 SEGMENTS-

HIGHEST WEIGHTED COLLISION SEVERITY
No PRIMARY

ROAD SEGMENT NUMBER OF

COLLISIONS

WEIGHTED
VALUE

SEGMENT
LENGTH
(MI)

WEIGHTED
VALUE/
MILE

COLLISION
TYPES

PRIMARY

COLLISION

FACTORS
OTHER

TRENDS CITY COMMENTS
13 Alameda
Street
Paramount
Boulevard to
Lakewood
Boulevard 20 220 0.95 231.58
30%
Sideswipe,
25%
Broadside
53% Improper
Turning
55% Night
Time collisions,
45% Collisions
with Parked
Motor Vehicles
City is not doing anything here now-- Alamedia elementary school is on Pattent and Birchdale -- speeding complaints on Alameda between Downey and Brookshire. City is looking into traffic calming on this stretch. The speed limit is posted at 30 mph on this residential street.
14 Woodruff
Foster Road to
Firestone
Boulevard 70 340 1.52 223.68
26% Rear
End, 24%
Sideswipe,
24%
Broadside
38% Improper
Turning, 26%
Auto ROW
not proposing anything here now.-- three are signal upgrades at Firestone (protected LT), Imperial, Stewart & Gray, and Foster-- There are schools along this corridor- Columbus (continuation) High School, and Calgary Chapel 15 Old River
School Road
Imperial
Highway to
Florence
Avenue 90 440 2.37 185.65
32%
Sideswipe,
24% Rear
End, 23%
Broadside
41% Improper
Turning
6% Collisions
with Bikes &
Peds
Lane reductions were just done between Imperial and Arnette. Nothing is in the works for the other section here. The City would like to continue the bike lanes along this corridor
16 Downey
Avenue North End 86 686 4.18 164.11
Our Lady elementary school is between Florence and 5th. there is an unmarked school crosswalk here that can use in-pavement flashers, RRFBs,and warning beacons

Downey
Avenue
Downtown
Area #DIV/0!
rear end
collisions?
project 20 years ago to reduce lanes to 2 lanes with bulb-outs and angled parking for a downtown feel. during peak school times long queues build up on Northbound Downey Avenue

Downey
Avenue South End #DIV/0!
Consistant, not much to it, lots of speeding and visibility complaints. Requests for red curb, but would cause parking impacts

Downey
Avenue NB to Firestone #DIV/0!
#2 lane traps the intersection right turn only lane may have sideswipe collisions here
17 Columbia Way
South City
Limits to
Lakewood
Boulevard 19 94 0.81 116.05
characteristics change at Imperial and Lakewood- densley populated with angled parking on the west side

TOP 21 SEGMENTS-

HIGHEST WEIGHTED COLLISION SEVERITY
No PRIMARY

ROAD SEGMENT NUMBER OF

COLLISIONS

WEIGHTED
VALUE

SEGMENT
LENGTH
(MI)

WEIGHTED
VALUE/
MILE

COLLISION
TYPES

PRIMARY

COLLISION

FACTORS
OTHER

TRENDS CITY COMMENTS
Imperial #DIV/0!
South of Imperial Hgihway is Carpenter Elementary School-- not a lot going on here- - speeding complaints while crossing the freeway
18 Bellflower
Boulevard
Lakewood
Boulevard to
Stewart & Gray 10 40 0.36 111.11
40% Rear
End
40% Improper
Turning, 30%
Unsafe Speed
only 10%
sideswipes Lot of trucks going to Cocacola
19 Suva Street
Bluff Road to
Paramount
Boulevard 14 69 0.71 97.18 speeding?
Schools at Tweedy- Grifith Middle School and Elementary school --A lot of pedestrian activity and pick-up and drop-off trafic. During school hours crossing guards are at the intersections
20 Gardendale
Street
Garfield
Avenue to
Lakewood
Boulevard 27 147 1.73 84.97
Did an accident analysis before/after study for the bike lane project. Improvements did not change the collision trends. There was a reduction of broadside, head on and rear end collisions but an increase in sideswipe collisions. -- kept 2 lanes from the bike master plan to maintain the LOS, Pass through intersection lanes reduce to 1 lane
21 Rives Avenue
Imperial
Highway to
Florence
Avenue 28 118 2.79 42.29

Local Road Safety Plan
Safety Project Analysis
City of Downey

Projects Location Countermeaure 1 Countermeaure 2 Construction Cost PE Cost (25% Construction Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local Match Comments City Comments Brookshire
Avenue Signal
Hardware
Upgrades
Brookshire
at 5th, 3rd,
Alameda,
and
Gardendale
S2: Upgrade
Signal Hardware
$ 116,000.00 $ 29,000.00 $ 17,400.00 $ 162,400.00 $ 3,561,208.00 21.93 100%
Federally
Funded

Brookshire
at Alameda
S2: Upgrade
Signal Hardware
S07: Provide
protected left
turn phase
$ 125,000.00 $ 31,250.00 $ 18,750.00 $ 175,000.00 $ 7,012,024.00 40.07 100%
Federally
Funded
Brookshire
at 5th, 3rd,
Alameda,
and
Gardendale
S2: Upgrade
Signal Hardware
S07: Provide
protected left
turn phase
$ 212,000.00 $ 53,000.00 $ 31,800.00 $ 296,800.00 $ 12,681,320.00 42.73 100%
Federally
Funded

Pedestrian
Crossing
Enhancements

Pedestrian Set
Aside
$ 179,000.00 $ 44,000.00 $ 27,000.00 $ 250,000.00 - - 100%
Federally
Funded
we should rank
citywide
midblock
crosswalks to
develop priority
list for set aside
projects
Firestone
Dolan Signal
Hardware
Upgrades
Firestone/
Dolan
S2: Upgrade
Signal Hardware

$ 20,000.00 $ 5,000.00 $ 3,000.00 $ 28,000.00 $ 1,344,391.00 48.01 100%
Federally
Funded
Protected
permissive
signal with
video detection
already. Vehicle
heads need to
be updated
Columbia
Signal
Hardware
Upgrades
Columbia/
Foster
S2: Upgrade
Signal Hardware

$ 20,000.00 $ 5,000.00 $ 3,000.00 $ 28,000.00 $ 1,210,700.00 43.24 100%
Federally
Funded
This location
was mentioned
in the kick off
meeting- shared
intersection
with Bellflower.

Old vehicle
heads and mast
arms.
protected left
turn request
does not meet
warrant. Need
left turn pockets
and hardware.

Crossing guard is
assigned at this
intersection.

Bellflower is
interested in
improvement

Local Road Safety Plan
Safety Project Analysis
City of Downey

Projects Location Countermeaure 1 Countermeaure 2 Construction Cost PE Cost (25% Construction Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local Match Comments City Comments Gardendale
Signal
Hardware
Upgrades
Gardendale/
Barlin
S2: Upgrade
Signal Hardware

$ 20,000.00 $ 5,000.00 $ 3,000.00 $ 28,000.00 $ 415,701.00 14.85 100%
Federally
Funded
can look into
doing a
Gardendale
corridor project
Firestone
Corridor
Traffic Signal
Project
14 signalized
intersections
on Firestone
Boulevard
S17PB:

Pedestrian
Countdown
Heads
S21PB: LPI $ 208,800.00 $ 52,200.00 $ 31,320.00 $ 292,320.00 $ 15,375,352.00 52.60 100%
Federally
Funded
install ped
countdown
heads, push
buttons and
program LPI
phasing and
updated
crosswalk
timing for the
14 signalized
intersections on
firestone
Firestone has
potential for
corridor Traffic
Signal Project.

The corridor is
not pedestrain
or ADA friendly.

The crossing
gates may not
have adequate
ADA length
Woodruff
Corridor
Project
Woodruff/
Hall
NS03: Install
Signals

$ 300,000.00 $ 75,000.00 $ 45,000.00 $ 420,000.00 $ 428,794.00 1.02 100%
Federally
Funded There were only
2 collisions at
Woodruff/ Hall
in a 12-month
period so the
traffic signal
warrant would
not be met for
HISP purposes.

Woodruff at Hall
Road (stop
controlled
currently) could
be a good
candidate for a
traffic signal
project. There
are a lot of
trucks going
through there
with lots of
broadside
collisions.

Vertical curve
causes visibility
issues on Hall
Road

Local Road Safety Plan
Safety Project Analysis
City of Downey

Projects Location Countermeaure 1 Countermeaure 2 Construction Cost PE Cost (25% Construction Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local Match Comments City Comments Pedestrian
Crossing
Enhancements
Downey Ave
at Our Lady
of Perpetual
Help School
Pedestrian Set
Aside

$ 40,000.00 $ 10,000.00 $ 6,000.00 $ 56,000.00 N/A N/A 100%
Federally
Funded
There were no
collisions at this
crosswalk, so
this would be a
good candidate
for the
pedestrian set
aside
Brookshire/
Everest-
uncontrolled
crosswalk with
latter, signs,
RRFB updates.
(same
improvement on
Downey Avenue
at OLPH School).

Woodruff
Doty HAWK
Woodruff/
Doty
NS23PB: Install
Pedestrian Signal
(Including HAWK)

$ 300,000.00 $ 75,000.00 $ 45,000.00 $ 420,000.00 $ - 0.00 100%
Federally
Funded
There were no
collisions at this
intersection
Have a HAWK
signal at
Woodruff/ Doty
Middle School.

With crossing
guard timing
conflicting with
crossing guard
and HAWK.

People don’t
know how to
move through it
and treat it as an
all way stop
Gardendale
corridor
project
Gardendale
@ Barlin,
Somerset
Ranch Road,
Paramount,
Garfield
S2: Upgrade
Signal Hardware

$ 80,000.00 $ 20,000.00 $ 12,000.00 $ 112,000.00 $ 249,923.00 2.23 100%
Federally
Funded
Paramount is
interested in
teaming up with
Downey to
upgrade this
corridor.

However, the
BCR is not
competitive.

Florence
Median
Project
Florence
Avenue
from West
City Limit to
Lestford Ave
R08: Install
Raised Medians

$ 2,178,000.00 $ 544,500.00 $ 326,700.00 $ 3,049,200.00 $ 29,862,200.00 9.79 $ 304,920
The raised
median
countermeasure
requires a 10%
local match

Local Road Safety Plan
Safety Project Analysis
City of Downey

Projects Location Countermeaure 1 Countermeaure 2 Construction Cost PE Cost (25% Construction Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local Match Comments City Comments Downey Bike
Lane Corridor
Project
Foster Road
between
Belflower
Boulevard to
East End
R32PB: Install
Bike Lanes
$ 48,600.00 $ 12,150.00 $ 7,290.00 $ 68,040.00 $ 5,437,068.00 79.91 $ 6,804
The bike lane
countermeasure
requires a 10%
local match

Brookshire
between
Imperial
Highway to
Stewart &
Gray
R32PB: Install
Bike Lanes
$ 52,800.00 $ 13,200.00 $ 7,920.00 $ 73,920.00 $ 188,940.00 2.56 $ 7,392

Arnette to
Florence
Avenue
R32PB: Install
Bike Lanes
$ 62,400.00 $ 15,600.00 $ 9,360.00 $ 87,360.00 $ 188,767.00 2.16 $ 8,736

Foster,
Brookshire,
Arnette
R32PB: Install
Bike Lanes
$ 163,800.00 $ 40,950.00 $ 24,570.00 $ 229,320.00 $ 5,814,775.00 25.36 $ 22,932
This project
consists of the
above 3
projects lumped
together into
one systemic
project

Downey LRSP
Countermeasure and Project Review
Meeting Minutes
September 22, 2021
Attendees: Nicolle, Jeff, Ed, Amaka

- Top Intersections & Corridors Review (see Attached tables for summary and comments)
- Countermeasure Selection Review (see Attached project table for summary) o Look into a street lighting project on Alameda Street and Old River School Road. This is a top priority to the City to install street lighting midblock.

The City already did a LED lighting conversion to City-owned street lighting.
▪ The below map identifies the night-time collisions that occurred in the City between 2015-2019 where there were no street lights, or street lights were not functioning. There were only 26 collisions that occurred Citywide in the 5-year study period where there were no street lights at the crash site. All of those 26 collisions were property damage only collisions. Any street lighting project will not be competitive in HSIP due to the low number of collisions Citywide.

▪ Edison owns 2/3 of the street lights in the City. The city owns the other 1/3.
o Brookshire- stick with the first project
o Pedestrian crossing project- construction costs are skyrocketing. ▪ Willdan will develop a prioritized list of locations for a set aside project
o Traffic signal project- inflate construction costs
o Paramount Gardendale project is complete- remove from list o Firestone- add hardware and controller/detection upgrades to the project o Firestone median project- Willdan can look into breaking the project into segments/ hot spots to make a lower cost project to inflate the BCR to be more competitive.
o Willdan will prioritize street lighting and the Firestone corridor projects, then other projects will be prioritized based on BCR.
- Next Steps
o Core Team meetings. Incorporate stakeholders from the following:

▪ Police Department
▪ Fire Department
▪ School Districts
▪ Parks and Recreation Department
▪ Bike Coalition
▪ Community Development Department
▪ PIH Hospital or Keiser Permanente

o Draft Report complete in November

- Action Items:
o City of Downey- will contact stakeholders listed below to set up a meeting in October
▪ Police Department
▪ Fire Department
▪ School Districts
▪ Parks and Recreation Department
▪ Bike Coalition
▪ Community Development Department
▪ PIH Hospital or Keiser Permanente
o Willdan- will continue to develop and prioritize projects for the LRSP and will check in on the first week of October to schedule the first stakeholder meeting.

TOP 15 INTERSECTIONS -

HIGHEST WEIGHTED COLLISION SEVERITY
No. MAJOR

ROADWAY
MINOR

ROADWAY

NUMBER OF

COLLISIONS

WEIGHTED
VALUE

COLLISION
TYPES

PRIMARY COLLISION

FACTORS
OTHER

NOTABLE
TRENDS

CITY COMMENTS COMMENTS
1 Lakewood
Boulevard
Stewart and
Gray Road 68 753
57% Broadside,
31% Rear End
34% Automobile Right of
Way, 24% Unsafe Speed
Just completed improvements for protected
permissive improvements
updated signal hardware & video
detection
2 Lakewood
Boulevard
Firestone
Boulevard 112 707
42% Broadside,
21% Rear End
37% Automobile Right of
Way
There is a project in the works for northbound and
southbound left turn lanes and fully protected
phasing funded through the hot spots project. The
design is finishing up now, the construction phase
has not started yet.
updated signal hardware & video
detection- over capacity, in need of
protected left turn phasing (will be funded
through Metro)
3 Telegraph
Road
Paramount
Boulevard 39 594 62% Broadside
45% Automobile Right of
Way
The controller is being upgraded to a 2070
controller. This location is a part of the Paramount
HSIP project. Medians are under construction now
on Telegraph Road
weathered signal hardware & video
detection
4 Downey
Avenue
Imperial
Highway 55 575 62% Broadside
29% Automobile Right of
Way, 24% Traffic Singals/
Signs
HSIP on Imperial Highway is upgrading this
intersection to fully protected left turn phasing
updated signal hardware & video
detection
5 Florence
Avenue Lakewood Blvd 73 533
41% Broadside,
33% Rear-End
33% Automobile Right of
Way, 22% Unsafe Speed
year trends:
2015:15,
2016:14,
2017:25,
2018:8,
2019:11
a project is in the works at this location and the
intersection already has fully protected left turn
phasing added in 2015 or 2016. a. Did this
improvement drop the crash trend from 2016-
2020?
updated signal hardware & video
detection
6 Bellflower
Boulevard
Imperial
Highway 49 424
33% Broadside,
31%Rear-End
22% Improper Turning,
Unknown, 20% Unsafe
Speed, 20% Unknown all is done that can be done at this intersection updated signal hardware & video
detection
7 Brookshire
Avenue
Imperial
Highway 38 363 58% Broadside
41% Automobile Right of
Way
fully protected left turn phasing project is in the
works
updated signal hardware & video
detection
8 Firestone
Boulevard Dolan Avenue 25 350
44% Broadside,
28% Rear-End
33% Automobile Right of
Way, 29% Unsafe Speed
nothing is in the works at this location. This
location can use some hardware improvements small signal hardware & video detection 9 Bellflower
Boulevard
Stewart and
Gray Road 38 333 50% Broadside
37% Automobile Right of
Way
nothing substantial has been done here recently.

Has recently upgraded the controller and battery
backup
updated signal hardware & video
detection
10 Paramount
Boulevard
Stewart and
Gray Road 46 331
43% Broadside,
28% Rear End
28% Automobile Right of
Way, 20% Unsafe Speed
This intersection is part of the Paramount HSIP
project
updated signal hardware & video
detection

TOP 15 INTERSECTIONS -

HIGHEST WEIGHTED COLLISION SEVERITY
No. MAJOR

ROADWAY
MINOR

ROADWAY

NUMBER OF

COLLISIONS

WEIGHTED
VALUE

COLLISION
TYPES

PRIMARY COLLISION

FACTORS
OTHER

NOTABLE
TRENDS

CITY COMMENTS COMMENTS
11 Florence
Avenue
Old River School
Road 26 271 42% Broadside
28% Automobile Right of
Way, 28% Improper
Turning
year trends:
2015:12,
2016:2,
2017:6,
2018:1,
2019:5
Poles, vehicle heads, services, curb ramps, and
controllers updated in 2015 or 2016
updated signal hardware & video
detection
12 Imperial
Highway Lakewood Blvd 56 256 43% Rear End 31% Unsafe Speed Improvements are in the works through the hot
spots project. Double left turn lanes on Imperial
Highway and coordinated signals
updated signal hardware & video
detection
13 Imperial
Highway Columbia Way 39 234
54% Broadside,
28% Rear End
49% Automobile Right of
Way, 21% Unsafe Speed protected permissive phasing currently updated signal hardware & video
detection
14 Imperial
Highway
Paramount
Boulevard 47 217 45% Rear End 23% Unsafe Speed
project is in the works using I-710 early action.

Double left turn lanes for the Southbound and
Westbound directions. Plans to widen the south
side of Imperial Highway for a wider receiving lane
for safer u-turns
updated signal hardware & video
detection
15 Florence
Avenue Little Lake Road 31 166
42% Broadside,
23% Sideswipe 35% Unknown Caltrans maintained intersection caltrans signal

TOP 22 SEGMENTS-

HIGHEST WEIGHTED COLLISION SEVERITY
No. PRIMARY

ROAD SEGMENT
NUMBER
OF

COLLISIONS

WEIGHTED
VALUE

SEGMENT
LENGTH
(MI)

WEIGHTED
VALUE/
MILE

COLLISION
TYPES

PRIMARY

COLLISION

FACTORS
OTHER

TRENDS CITY COMMENTS
1 Firestone
Boulevard City Limit to City Limit 373 3078 3.25 947.08 34% Rear
End, 27%
Broadside
27% Auto
Right Of Way,
25% Unsafe
Speed, 20%
Improper
Turning
Good project opportunity- signal upgrades & speed feedback signs. -- Medians constructed 8 years ago. Lakewood Boulevard to Old River School Road has some median openings. Closing these median openings could be an option if there is a collision history at the openings. --The signals on Firestone Boulevard are fully protected.-- Downey High School is on Firestone at Patton with high ped volume. Look into left turn phasing or split phasing at Firestone/Patton.
2 Lakewood
Boulevard City Limit to City Limit 319 2529 3.94 641.88 52% Rear
End
43% Unsafe
Speed Not sure what can be done
3 Florence
Avenue City Limit to City Limit 259 2099 3.43 611.95
36% Rear
End, 33%
Broadside
28% Unsafe
Speed, 28%
Auto Right of
Way
No medians at all- City is open to a median project here -- A complete streets project is in the works by the Gateway Cities COG-- road gets congested at Paramount Boulevard-- no room for a second left turn lane at the freeway intersection
4 De Palma Street
Paramount Boulevard
to Gurley Avenue 4 144 0.24 600.00
75%
Sideswipe,
25% Hit
Object
25% Unsafe
Starting and
Backing, 25%
Unsafe Speed,
25% Auto
ROW, 25%
Improper
Turning
1 Bicycle
Collision
Next to Warran high School- fatality came from a student racing their car and hit a tree
5 Bellflower
Boulevard
Stewart & Gray to
Dalen Street 54 474 0.87 544.83
31% Rear
End, 26%
Hit Object
37% Improper
Turning, 25%
Unsafe Speed
26% Hit
Object
Collisions
Crosses Imperial Highway and runs near Kaiser--not sure what can be done here
6 Imperial
Highway
Old River School Road
to Woodruff Avenue 213 1278 2.79 458.06
38% Rear
End, 21%
Hit Object
29% Unsafe
Speed, 25%
Improper
Turning City has done all they can do on Imperial
7 Stewart & Gray
Road
West City Limit to
Firestone Boulevard 168 1423 3.15 451.75
34% Rear
End, 23%
Sideswipe,
23%
Broadside
30% Improper
Turning, 24%
Unsafe Speed,
21% Auto
ROW Project in the works to upgrade signalized intersections and coordination

TOP 22 SEGMENTS-

HIGHEST WEIGHTED COLLISION SEVERITY
No. PRIMARY

ROAD SEGMENT
NUMBER
OF

COLLISIONS

WEIGHTED
VALUE

SEGMENT
LENGTH
(MI)

WEIGHTED
VALUE/
MILE

COLLISION
TYPES

PRIMARY

COLLISION

FACTORS
OTHER

TRENDS CITY COMMENTS
8 Brookshire
Avenue
Manatee Street to 5th
Street 23 243 0.64 379.69
39%
Broadside
52% Auto
Right of Way Crosses Firestone, PIH and Downey High School 9 Foster Road
Bellflower Boulevard
to East End 10 300 0.81 370.37
20%
Broadside,
20% Hit
Object, 20%
Rear End,
20%
Sideswipe
33% Improper
Turning, 22%
Unsafe Speed,
22% Unknown
20% Ped/Bike
Collisions
Cross elementary schools along this stretch- are there any ped/school improvements here? -- Look into a lane reduction + bike lane project here while maintaining on-street parking (would need to get Bellflower involved and on-board)
10 Paramount
Boulevard City Limit to City Limit 247 1637 4.64 352.80 41% Rear
End, 23%
Broadside,
21%
Sideswipe
28% Unsafe
Speed, 27%
Improper
Turning
year trends:
2015:69,
2016:58,
2017:33,
2018:44,
2019:43
Done a lot here recently-- medians between Imperial and Firestone and between Firestone and Florence -- HSIP Project is under construction now -- new traffic signal by the High School on De Palma
11 Brookshire
Avenue
Imperial Highway to
Stewart & Gray 27 252 0.88 286.36
44%
Sideswipe,
26%
Broadside
54% Improper
Turning
33% Collisions
with Parked
Motor
Vehicles
City is considering lane reductions and bike lanes here -- Have already done the lane reductions between Imperial Highway and Gardendale Street 12 Downey Avenue
Firestone to South
City Limit 66 561 2 280.50
42% Rear
End, 24%
Broadside
38% Unsafe
Speed, 24%
Auto ROW
Consistant, not much to it, lots of speeding and visibility complaints.

Requests for red curb, but would cause parking impacts
13 Telegraph Road City Limit to City Limit 72 622 2.24 277.68 26% Rear
End, 24%
Sideswipe,
24%
Broadside
27% Unsafe
Speed, 27%
Auto ROW,
25% Improper
Turning
Project under construction with City of Pico Rivera for raised medians between Passons and the East City Lmit, pavement upgrades, and Birch Park and True Ave signal upgrades with protected permissive left turn phasing.

TOP 22 SEGMENTS-

HIGHEST WEIGHTED COLLISION SEVERITY
No. PRIMARY

ROAD SEGMENT
NUMBER
OF

COLLISIONS

WEIGHTED
VALUE

SEGMENT
LENGTH
(MI)

WEIGHTED
VALUE/
MILE

COLLISION
TYPES

PRIMARY

COLLISION

FACTORS
OTHER

TRENDS CITY COMMENTS
14 Alameda Street
Paramount Boulevard
to Lakewood
Boulevard 20 220 0.95 231.58
30%
Sideswipe,
25%
Broadside
53% Improper
Turning
55% Night
Time
collisions,
45% Collisions
with Parked
Motor
Vehicles
City is not doing anything here now-- Alamedia elementary school is on Pattent and Birchdale -- speeding complaints on Alameda between Downey and Brookshire. City is looking into traffic calming on this stretch. The speed limit is posted at 30 mph on this residential street.
15 Woodruff
Foster Road to
Firestone Boulevard 70 340 1.52 223.68
26% Rear
End, 24%
Sideswipe,
24%
Broadside
38% Improper
Turning, 26%
Auto ROW
not proposing anything here now.-- three are signal upgrades at Firestone (protected LT), Imperial, Stewart & Gray, and Foster-- There are schools along this corridor- Columbus (continuation) High School, and Calgary Chapel 16 Downey Avenue 5th to Firestone 9 54 0.28 192.86
56% Rear
End, 22%
Vehicle
Pedestrian
33% Unsafe
Speed, 22%
Auto ROW,
22% Improper
Turning
rear end
collisions- yes
project 20 years ago to reduce lanes to 2 lanes with bulb-outs and angled parking for a downtown feel.-- during peak school times long queues build up on Northbound Downey Avenue
17 Old River School
Road
Imperial Highway to
Florence Avenue 90 440 2.37 185.65
32%
Sideswipe,
24% Rear
End, 23%
Broadside
41% Improper
Turning
6% Collisions
with Bikes &
Peds
Lane reductions were just done between Imperial and Arnette. Nothing is in the works for the other section here. The City would like to continue the bike lanes along this corridor
18 Columbia Way
South City Limits to
Lakewood Boulevard 19 94 0.81 116.05
characteristics change at Imperial and Lakewood- densley populated with angled parking on the west side
19 Bellflower
Boulevard
Lakewood Boulevard
to Stewart & Gray 10 40 0.36 111.11
40% Rear
End
40% Improper
Turning, 30%
Unsafe Speed
only 10%
sideswipes Lot of trucks going to Cocacola
20 Suva Street
Bluff Road to
Paramount Boulevard 14 69 0.71 97.18 speeding?
Schools at Tweedy- Grifith Middle School and Elementary school --A lot of pedestrian activity and pick-up and drop-off trafic. During school hours crossing guards are at the intersections

TOP 22 SEGMENTS-

HIGHEST WEIGHTED COLLISION SEVERITY
No. PRIMARY

ROAD SEGMENT
NUMBER
OF

COLLISIONS

WEIGHTED
VALUE

SEGMENT
LENGTH
(MI)

WEIGHTED
VALUE/
MILE

COLLISION
TYPES

PRIMARY

COLLISION

FACTORS
OTHER

TRENDS CITY COMMENTS
21 Gardendale
Street
Garfield Avenue to
Lakewood Boulevard 27 147 1.73 84.97
Did an accident analysis before/after study for the bike lane project.

Improvements did not change the collision trends. There was a reduction of broadside, head on and rear end collisions but an increase in sideswipe collisions. -- kept 2 lanes from the bike master plan to maintain the LOS, Pass through intersection lanes reduce to 1 lane
22 Downey Avenue North End to 6th 14 79 1.32 59.85
29%
Broadside,
29% Rear
End
43% Improper
Turning
29% parked
motor vehicle
Our Lady elementary school is between Florence and 5th. there is an unmarked school crosswalk here that can use in-pavement flashers, RRFBs,and warning beacons

Local Road Safety Plan
Safety Project Analysis
City of Downey
Projects Location Countermeaure 1 Countermeaure 2 Construction Cost PE Cost (25% Construction Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local Match Comments City Comments Brookshire
Avenue Signal
Hardware
Upgrades
Brookshire at
5th, 3rd,
Alameda, and
Gardendale
S2: Upgrade
Signal Hardware

$ 116,000.00 $ 29,000.00 $ 17,400.00 $ 162,400.00 $ 3,561,208.00 21.93 100% Federally
Funded

Use this project for the
LRSP recommendation
Brookshire at
Alameda
S2: Upgrade
Signal Hardware
S07: Provide
protected left
turn phase
$ 125,000.00 $ 31,250.00 $ 18,750.00 $ 175,000.00 $ 7,012,024.00 40.07 100% Federally
Funded

Brookshire at
5th, 3rd,
Alameda, and
Gardendale
S2: Upgrade
Signal Hardware
S07: Provide
protected left
turn phase
$ 212,000.00 $ 53,000.00 $ 31,800.00 $ 296,800.00 $ 12,681,320.00 42.73 100% Federally
Funded

Pedestrian
Crossing
Enhancements

Pedestrian Set
Aside

$ 179,000.00 $ 44,000.00 $ 27,000.00 $ 250,000.00 - - 100% Federally
Funded
we should rank
citywide
midblock
crosswalks to
This cost can include 2
or 3 project locations
due to skyrocketing
construction costs

Local Road Safety Plan
Safety Project Analysis
City of Downey
Projects Location Countermeaure 1 Countermeaure 2 Construction Cost PE Cost (25% Construction Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local Match Comments City Comments develop priority
list for set aside
projects
Firestone
Dolan Signal
Hardware
Upgrades
Firestone/ Dolan S2: Upgrade
Signal Hardware

$ 35,000.00 $ 8,750.00 $ 5,250.00 $ 49,000.00 $ 1,344,391.00 27.44 100% Federally
Funded
Number 8 in top
intersection list
of highest
weighted
collision values
in the City.

Protected
permissive
signal with
video detection
already. Vehicle
heads need to
be updated

Columbia
Signal
Hardware
Upgrades
Columbia/ Foster S2: Upgrade
Signal Hardware

$ 35,000.00 $ 8,750.00 $ 5,250.00 $ 49,000.00 $ 1,210,700.00 24.71 100% Federally
Funded
This location
was mentioned
in the kick off
meeting- shared
intersection
with Bellflower.

Old vehicle
heads and mast
arms.
protected left turn
request does not meet
warrant. Need left turn
pockets and hardware.

Crossing guard is
assigned at this
intersection. Bellflower
is interested in
improvement Look into
Columbia/ Adore
Gardendale
Signal
Hardware
Upgrades
Gardendale/
Barlin
S2: Upgrade
Signal Hardware

$ 35,000.00 $ 8,750.00 $ 5,250.00 $ 49,000.00 $ 415,701.00 8.48 100% Federally
Funded

Systemic
Signal
Hardware
Upgrade
Project
Firestone/ Dola,
Columbia/Foster,
Gardendale/
Barlin
S2: Upgrade
Signal Hardware

$ 105,000.00 $ 26,250.00 $ 15,750.00 $ 147,000.00 $ 2,970,792.00 20.21 100% Federally
Funded
The above 3
projects
combined to
create one
larger, systemic
project for
upgrading signal
hardware at

Local Road Safety Plan
Safety Project Analysis
City of Downey
Projects Location Countermeaure 1 Countermeaure 2 Construction Cost PE Cost (25% Construction Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local Match Comments City Comments spot locations
citywide
Firestone
Corridor
Traffic Signal
Project
14 signalized
intersections on
Firestone
Boulevard
S17PB:

Pedestrian
Countdown
Heads
S21PB: LPI $ 208,800.00 $ 52,200.00 $ 31,320.00 $ 292,320.00 $ 15,375,352.00 52.60 100% Federally
Funded
install ped
countdown
heads, push
buttons and
program LPI
phasing and
updated
crosswalk
timing for the
14 signalized
intersections on
firestone
Firestone has potential
for corridor Traffic
Signal Project. The
corridor is not
pedestrain or ADA
friendly. The crossing
gates may not have
adequate ADA length.

Look into adding
hardware, controller
anddetection upgrades
on this corridor too.

Woodruff
Corridor
Project
Woodruff/ Hall NS03: Install
Signals

$ 300,000.00 $ 75,000.00 $ 45,000.00 $ 420,000.00 $ 428,794.00 1.02 100% Federally
Funded
There were only
2 collisions at
Woodruff/ Hall
in a 12-month
period so the
traffic signal
warrant would
not be met for
HISP purposes.

Woodruff at Hall Road
(stop controlled
currently) could be a
good candidate for a
traffic signal project.

There are a lot of
trucks going through
there with lots of
broadside collisions.

Vertical curve causes
visibility issues on Hall
Road
Pedestrian
Crossing
Enhancements
Downey Ave at
Our Lady of
Perpetual Help
School
Pedestrian Set
Aside

$ 40,000.00 $ 10,000.00 $ 6,000.00 $ 56,000.00 N/A N/A 100% Federally
Funded
There were no
collisions at this
crosswalk, so
this would be a
good candidate
for the
pedestrian set
aside
Brookshire/ Everest-
uncontrolled crosswalk
with latter, signs, RRFB
updates. (same
improvement on
Downey Avenue at
OLPH School).

Local Road Safety Plan
Safety Project Analysis
City of Downey
Projects Location Countermeaure 1 Countermeaure 2 Construction Cost PE Cost (25% Construction Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local Match Comments City Comments Woodruff
Doty HAWK
Woodruff/ Doty NS23PB: Install
Pedestrian Signal
(Including HAWK)

$ 300,000.00 $ 75,000.00 $ 45,000.00 $ 420,000.00 $ - 0.00 100% Federally
Funded
There were no
collisions at this
intersection
Have a HAWK signal at
Woodruff/ Doty Middle
School. With crossing
guard timing conflicting
with crossing guard and
HAWK. People don’t
know how to move
through it and treat it
as an all way stop
Gardendale
corridor
project
Gardendale @
Barlin, Somerset
Ranch Road,
Paramount,
Garfield
S2: Upgrade
Signal Hardware

$ 80,000.00 $ 20,000.00 $ 12,000.00 $ 112,000.00 $ 249,923.00 2.23 100% Federally
Funded
Paramount is
interested in
teaming up with
Downey to
upgrade this
corridor.

However the
BCR is not
competative.

Remove
paramount/Gardendale
from this project
scope- this location has
been recently updated
Foster Ped
Bike
Improvements
Foster Road
between
Belflower
Boulevard to
East End
R32PB: Install
Bike Lanes

$ 48,600.00 $ 12,150.00 $ 7,290.00 $ 68,040.00 $ 5,437,068.00 79.91 $ 6,804
The bike lane
countermeasure
requires a 10%
local match

Brookshire
Ave Bike
Lanes
Brookshire
between
Imperial
Highway to
Stewart & Gray
R32PB: Install
Bike Lanes

$ 52,800.00 $ 13,200.00 $ 7,920.00 $ 73,920.00 $ 188,940.00 2.56 $ 7,392

Old River
School Road
Bike Lanes
Arnette to
Florence Avenue
R32PB: Install
Bike Lanes

$ 62,400.00 $ 15,600.00 $ 9,360.00 $ 87,360.00 $ 188,767.00 2.16 $ 8,736

Downey Bike
Lane Corridor
Project
Foster,
Brookshire,
Arnette
R32PB: Install
Bike Lanes

$ 163,800.00 $ 40,950.00 $ 24,570.00 $ 229,320.00 $ 5,814,775.00 25.36 $ 22,932
This project
consists of the
above 3
projects lumped
together into
one systemic
project

Local Road Safety Plan
Safety Project Analysis
City of Downey
Projects Location Countermeaure 1 Countermeaure 2 Construction Cost PE Cost (25% Construction Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local Match Comments City Comments Florence
Median
Project
Florence Avenue
from West City
Limit to Lestford
Ave
R08: Install
Raised Medians

$ 2,178,000.00 $ 544,500.00 $ 326,700.00 $ 3,049,200.00 $ 29,862,200.00 9.79 $ 304,920

Break into segments/
hot spots to make
lower cost project to
inflate the BCR

Local Road Safety Plan
Safety Project Analysis
City of Downey

Projects Location Countermeaure
1 Countermeaure
2 Construction Cost
PE Cost (25%
Construction
Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local
Match Comments City Comments
Brookshire
Avenue
Signal
Hardware
Upgrades
Brookshire
at 5th, 3rd,
Alameda,
and
Gardendale
S2: Upgrade
Signal Hardware
$
116,000.00
$
29,000.00
$
17,400.00
$
162,400.00
$
3,561,208.00

21.9 3
100%
Federally
Funded
Use this project
Brookshire
at Alameda
S2: Upgrade
Signal Hardware
S07: Provide
protected left
turn phase
$
125,000.00
$
31,250.00
$
18,750.00
$
175,000.00
$
7,012,024.00

40.0 7
100%
Federally
Funded
Brookshire
at 5th, 3rd,
Alameda,
and
Gardendale
S2: Upgrade
Signal Hardware
S07: Provide
protected left
turn phase
$
212,000.00
$
53,000.00
$
31,800.00
$
296,800.00
$
12,681,320.00

42.7 3
100%
Federally
Funded

Pedestrian
Crossing
Enhancement
s

Pedestrian Set
Aside
$
179,000.00
$
44,000.00
$
27,000.00
$
250,000.00 - -
100%
Federally
Funded
we should rank
citywide
midblock
crosswalks to
develop
priority list for
set aside
projects
This can include a few
projects
Firestone
Dolan Signal
Hardware
Upgrades
Firestone/
Dolan
S2: Upgrade
Signal Hardware

$
20,000.00
$
5,000.00
$
3,000.00
$
28,000.00
$
1,344,391.00

48.0 1
100%
Federally
Funded
Protected
permissive
signal with
video
detection
already.

Vehicle heads
need to be
updated

Local Road Safety Plan
Safety Project Analysis
City of Downey

Projects Location Countermeaure
1 Countermeaure
2 Construction Cost
PE Cost (25%
Construction
Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local
Match Comments City Comments
Columbia
Signal
Hardware
Upgrades
Columbia/
Foster
S2: Upgrade
Signal Hardware

$
20,000.00
$
5,000.00
$
3,000.00
$
28,000.00
$
1,210,700.00

43.2 4
100%
Federally
Funded
This location
was mentioned
in the kick off
meeting-
shared
intersection
with
Bellflower. Old
vehicle heads
and mast arms.
protected left turn request
does not meet warrant.

Need left turn pockets and
hardware. Crossing guard is
assigned at this intersection.

Bellflower is interested in
improvement
Gardendale
Signal
Hardware
Upgrades
Gardendale
/ Barlin
S2: Upgrade
Signal Hardware

$
20,000.00
$
5,000.00
$
3,000.00
$
28,000.00
$
415,701.00

14.8 5
100%
Federally
Funded
can look into
doing a
Gardendale
corridor
project
Firestone
Corridor
Traffic Signal
Project
14 signalized
intersection
s on
Firestone
Boulevard
S17PB:

Pedestrian
Countdown
Heads
S21PB: LPI $
208,800.00
$
52,200.00
$
31,320.00
$
292,320.00
$
15,375,352.00

52.6 0
100%
Federally
Funded
install ped
countdown
heads, push
buttons and
program LPI
phasing and
updated
crosswalk
timing for the
14 signalized
intersections
on firestone
Firestone has potential for
corridor Traffic Signal
Project. The corridor is not
pedestrain or ADA friendly.

The crossing gates may not
have adequate ADA length
Woodruff
Corridor
Project
Woodruff/
Hall
NS03: Install
Signals

$
300,000.00
$
75,000.00
$
45,000.00
$
420,000.00
$
428,794.00 1.02
100%
Federally
Funded
There were
only 2
collisions at
Woodruff/ Hall
in a 12-month
period so the
traffic signal
warrant would
not be met for
HISP purposes.

Woodruff at Hall Road (stop
controlled currently) could
be a good candidate for a
traffic signal project. There
are a lot of trucks going
through there with lots of
broadside collisions. Vertical
curve causes visibility issues
on Hall Road

Local Road Safety Plan
Safety Project Analysis
City of Downey

Projects Location Countermeaure
1 Countermeaure
2 Construction Cost
PE Cost (25%
Construction
Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local
Match Comments City Comments
Pedestrian
Crossing
Enhancement
s
Downey
Ave at Our
Lady of
Perpetual
Help School
Pedestrian Set
Aside

$
40,000.00
$
10,000.00
$
6,000.00
$
56,000.00 N/A N/A
100%
Federally
Funded
There were no
collisions at
this crosswalk,
so this would
be a good
candidate for
the pedestrian
set aside
Brookshire/ Everest-
uncontrolled crosswalk with
latter, signs, RRFB updates.
(same improvement on
Downey Avenue at OLPH
School).

Woodruff
Doty HAWK
Woodruff/
Doty
NS23PB: Install
Pedestrian
Signal (Including
HAWK)

$
300,000.00
$
75,000.00
$
45,000.00
$
420,000.00
$
- 0.00
100%
Federally
Funded There were no
collisions at
this
intersection
Have a HAWK signal at
Woodruff/ Doty Middle
School. With crossing guard
timing conflicting with
crossing guard and HAWK.

People don’t know how to
move through it and treat it
as an all way stop
Gardendale
corridor
project
Gardendale
@ Barlin,
Somerset
Ranch
Road,
Paramount,
Garfield
S2: Upgrade
Signal Hardware

$
80,000.00
$
20,000.00
$
12,000.00
$
112,000.00
$
249,923.00 2.23
100%
Federally
Funded
Paramount is
interested in
teaming up
with Downey
to upgrade this
corridor.

However, the
BCR is not
competitive.

Florence
Median
Project
Florence
Avenue
from West
City Limit to
Lestford
Ave
R08: Install
Raised Medians

$
2,178,000.00
$
544,500.00
$
326,700.00
$
3,049,200.00
$
29,862,200.00 9.79 $
304,920
The raised
median
countermeasur
e requires a
10% local
match
Downey Bike
Lane Corridor
Project
Foster Road
between
Belflower
Boulevard
to East End R32PB: Install
Bike Lanes
$
48,600.00
$
12,150.00
$
7,290.00
$
68,040.00
$
5,437,068.00

79.9 1
$
6,804
The bike lane
countermeasur
e requires a
10% local
match

Local Road Safety Plan
Safety Project Analysis
City of Downey

Projects Location Countermeaure
1 Countermeaure
2 Construction Cost
PE Cost (25%
Construction
Cost)
CM Cost (15%
Construction
Cost)
Total Cost Total Benefit BCR Local
Match Comments City Comments
Brookshire
between
Imperial
Highway to
Stewart &
Gray
R32PB: Install
Bike Lanes
$
52,800.00
$
13,200.00
$
7,920.00
$
73,920.00
$
188,940.00 2.56 $
7,392

Arnette to
Florence
Avenue
R32PB: Install
Bike Lanes
$
62,400.00
$
15,600.00
$
9,360.00
$
87,360.00
$
188,767.00 2.16 $
8,736

Foster,
Brookshire,
Arnette
R32PB: Install
Bike Lanes
$
163,800.00
$
40,950.00
$
24,570.00
$
229,320.00
$
5,814,775.00

25.3 6
$
22,932
This project
consists of the
above 3
projects
lumped
together into
one systemic
project

Appendix VII: Crash Maps Around Schools

"s
"s
"s"ù
1-UnsworthElementarySchool
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"ù
"s
"s2-GallatinElementarySchool
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s
"s
"s"s"s
"s
"s
"s
"s"ù
"ù
"s
"s
"s
"s
3-Griffiths MiddleSchool & Maude PriceElementary School Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s
"s
"s
4-Rio HondoElementarySchool
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"ù
"s
"s!G
"s
"s
"s
"s
"s
"s
"s"s "s
"s
"s"s"s"s
"ù
"s
"s
5-DotyMiddleSchool
6-Rio San GabrielElementary School
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"ù
"s!G
"s
"s
"s
"s
"s
"s"s "s"s"s"s"s
"ù
"s
"s
5-DotyMiddleSchool
6-Rio San GabrielElementary School
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s
"s
"s
!G
"s
"s "s
"s
"s"s
"s
"s
"s
"ù
"s
"s
"s
"s
"s"s
"s
"s
"s
"s
"s
"s
"s
"s
"s
"s
"s"s
"s
"s
"ù
"s
"s
"s
"s
"s
"s
"s"s
"s
"s"s
"s
"s
"s"s"s
!G
!G"s
"s
"s"ù
"s
"s
"s
"ù
"s"s
"s
"s
"s
"s
"s"s
"s"s
!G
"s
"s
!G
"s
"s
"s
"s
"s
"s "s
!G
"s
"s"s
7-DowneyHigh School
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"ù
"s
"s
!G
"s"s
!G
"s
"ù
"s
"s
"s"s
!G
"s
"s
"s
"s
!G
"s
"s
"s"s "s
"s
"s
8-WarrenHigh School
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s
"s "s
!G
"s
"s"s
"s
"s
!G
"s
"s
"s
!G
"s
"ù"s"s
"s
!G
"s
"ù
"ù
9-AlamedaElementarySchool
10-SussmanMiddleSchool
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s
"ù
"s
"s
"s
"s
"s
"s
!G
"s
"s
"s
"s
"s
"s
"s
"s
!G
"s
"s
"s
"s
"s
"s
"s
!G
"s
"ù"s"s
"s
"s "s
"s
"s
"ù
"ù
"s
9-AlamedaElementarySchool
10-SussmanMiddleSchool
15-WardElementarySchool
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s
"s"s
"s
"s"s"s"s"s"s "s!G"s"s"s
"s
"s
"s
"s"s"s"s"s"s
11-GauldinElementarySchool
12-ColumbusContinuationHigh School
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s
"s"s
"s
"s"s"s"s"s"s "s!G"s"s"s
"s
"s"s"s"s"s"s"s
11-GauldinElementarySchool
12-ColumbusContinuationHigh School
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s
"s
"s "s"s"s "s
13-LewisElementarySchool
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"ù
"s
"s"s
"s
"s"s
"s
"s
"s
"s
14-CarpenterElementarySchool
15-WardElementarySchool
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s"s
"s
"ù
"s
"s
"s
"s
"s
"s"s
"s
"s
"s
"s"s
"s
"s"s
"s"s
"s
"s
"s
!G
"s
"s
"s
"s
"s
"s
"s
"s
"s
"s
"s
"s
"s
"s
"s
"s
"s "ù
"s
"s"s
10-SussmanMiddleSchool
15-WardElementarySchool
16-ImperialElementarySchool
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s
"s
"s"s"s
"ù
"s"s"s
"s
"s
"s
"s
"s
"s
"s
"s"s"s
"s
"s"s
15-WardElementarySchool
16-ImperialElementarySchool
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s"s
"s
"s
"s"s
"s
!G"s"s
"s
"s"s"s
17-St Pius X - StMatthias Academy
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s
"s
"s
"s
"s"s
"s18-Old RiverElementary School &West Middle School
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 490 0 490245 Feet1:5,000

"s
"s
"s
"s"s
"s
"s "ù
"s
"s"ù
"ù
"s
"s
"s
"s
8-WarrenHighSchool
18-Old RiverElementary School &West Middle School
19-WilliamsElementarySchool
Esri, HERE, Garmin, (c) OpenStreetMap contributors, and the GIS user community CITY OF DOWNEY 2020-2023 CRASH LOCATION HEATMAPPublic and Private Schools /
Number Crashes within 500 ft of the School1. Edith Unsworth Elem - 4 crashes2. Gallatin Elem - 3 crashes3. Maude Price Elem - 15 crashes combined3. Griffiths Middle - 15 crashes combined4. Rio Hondo Elem - 3 crashes5. Doty Middle - 18 crashes6. Rio San Gabriel Elem - 3 crashes7. Downey High - 86 crashes8. Warren High - 26 crashes9. Alameda Elem - 13 crashes10. Sussman Middle - 15 crashes11. Al Gauldin Elem - 1 crash12. Columbus High -23 crashes13. Lewis Elem - 6 crashes14. Carpenter Elem - 5 crashes15. Ward Elem - 18 crashes16. Imperial Elem - 22 crashes17. St Pius X - St Matthias Academy - 14 crashes18. West Middle - 7 crashes combined18. Old River Elem - 7 crashes combined19. Williams Elem - 13 crashes 500 0 500250 Feet1:5,000

Page i

RESOLUTION NO. 24-8265

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DOWNEY
APPROVING THE CITY’S UPDATED LOCAL ROAD SAFETY PLAN

WHEREAS, a Local Road Safety Plan (LRSP) provides a framework for organizing stakeholders to identify, analyze and prioritize roadway safety improvements on local and rural roads; and

WHEREAS, the LRSP is a means for providing local and rural road owners with an opportunity to address unique highway safety needs in their jurisdictions while contributing to the success of the Statewide Strategic Highway Safety Plan (SHSP); and

WHEREAS, the process of preparing the LRSP creates a framework to systematically identify and analyze safety problems and recommend safety improvements and facilitates the development of Local Public Agency (LPA) partnerships and collaboration, resulting in a prioritized list of improvements and actions that can demonstrate a defined need and contribute to the statewide plan; and

WHEREAS, the LRSP offers a proactive approach to addressing safety needs and demonstrates agency responsiveness to safety challenges; and

WHEREAS, in order to apply for funding under the Highway Safety Improvement Program (HSIP), a public agency must have completed an LRSP or equivalent document; and

WHEREAS, the City of Downey completed the original LRSP in 2022 based on crash history within the City that occurred between 2015-2020 in order to assess the City’s traffic safety needs and developed a prioritized list of projects intended to enhance traffic safety within the City; and

WHEREAS, the Downey City Council adopted Resolution No. 22-8103 on September 27, 2022 officially certifying that the LRSP was completed; and

WHEREAS, the City has updated the LRSP, dated July 15, 2024, based on crash history within the City that occurred between 2020-2023 in order to reassess the City’s traffic safety needs, and developed an updated list of prioritized projects to enhance traffic safety within the City; and

WHEREAS, through the adoption of this Resolution, the City of Downey officially self- certifies that an updated LRSP or its equivalent has been completed to be submitted with future HSIP funding applications, as required.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF DOWNEY DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. The City Council hereby approves the City’s LRSP update, a copy of which is attached as Exhibit “A”.

SECTION 2. The City Clerk shall certify to the adoption of this Resolution.

APPROVED AND ADOPTED this 27th day of August, 2024.

ATTACHMENT C

RESOLUTION NO. 24-8265
PAGE 2

_________________________________
MARIO TRUJILLO, Mayor

ATTEST:

_

MARIA ALICIA DUARTE, CMC
City Clerk

APPROVED AS TO FORM:

___________________________________
JOHN M. FUNK
City Attorney

I HEREBY CERTIFY that the foregoing Resolution was adopted by the City Council of the City of Downey at a Regular meeting held on the 27th day of August 2024, by the following vote, to wit:

AYES: Council Members:

NOES: Council Members:

ABSENT: Council Members:

ABSTAIN: Council Members:

MARIA ALICIA DUARTE, CMC
City Clerk

RESOLUTION NO. 24-8265
PAGE 3

EXHIBIT “A”

RESOLUTION NO. 24-8266

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DOWNEY

APPROVING THE SUBMITTAL OF FUNDING APPLICATIONS FOR THE

FIRESTONE BOULEVARD CORRIDOR TRAFFIC SIGNAL IMPROVEMENTS,

SYSTEMIC TRAFFIC SIGNAL IMPROVEMENTS AT VARIOUS LOCATIONS,

THE FLORENCE AVENUE MEDIAN ISLAND, PEDESTRIAN CROSSING

SAFETY ENHANCEMENTS AT TWO LOCATIONS, AND THE KLONDIKE

AVENUE AND BIXLER AVENUE SIDEWALK AND CURB RAMP

INSTALLATION PROJECTS UNDER THE HIGHWAY SAFETY IMPROVEMENT PROGRAM, CYCLE 12

WHEREAS, the Highway Safety Improvement Program (HSIP) was established as a result of the passage of the Infrastructure Investment and Jobs Act (IIJA) signed into law by President Biden on November 15, 2021; and

WHEREAS, Under IIJA, the HSIP is a core federal-aid program available to the individual states for the purpose of achieving a significant reduction in fatalities and serious injuries on all public roads; and

WHEREAS, Caltrans is soliciting project applications for the HSIP for Federal Fiscal Year (FFY) 2024-25 (Cycle 12); and

WHEREAS, the City of Downey desires to upgrade existing traffic signals along Firestone Boulevard at 14 intersections to: enhance vehicular and pedestrian safety along the corridor as well as implement systemic traffic signal improvements at 16 additional intersections within the City at various intersections by improving the visibility of traffic signal indications and installing protected left-turn movements to enhance traffic safety at these locations through the reduction of broadside and other-type collisions; enhance traffic safety along Florence Avenue between Woodruff Avenue and Vultee Avenue by reducing mid-block collisions through the construction of raised median islands; enhance pedestrian safety at existing marked crosswalk locations on Rives Avenue and Adwen Street and Conrad Street at Montgomery Avenue through the installation of high-visibility flashing beacons, signage and pavement markings; and enhance pedestrian safety on Klondike Avenue and Bixler Avenue between Century Boulevard and a point approximately 450 feet north of Century Boulevard through the construction of sidewalk and curb ramps; and

WHEREAS, agencies are required to submit an application to Caltrans for each project.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF DOWNEY DOES RESOLVE AS FOLLOWS:

SECTION 1. The City Council hereby approves the submittal of the following project applications for HSIP funding: Firestone Boulevard Corridor Traffic Signal Upgrades, Systemic Traffic Signal Improvements at Various Locations, Florence Avenue Median Island, Pedestrian Crossing Safety Enhancements at Two Locations, and Klondike Avenue and Bixler Avenue Sidewalk and Curb Ramp Installation.

SECTION 2. The City Clerk shall certify to the adoption of this Resolution.

ATTACHMENT D

RESOLUTION NO. 24-8266
PAGE 2

APPROVED AND ADOPTED this 27th day of August, 2024.

MARIO TRUJILLO, Mayor

ATTEST:

MARIA ALICIA DUARTE, CMC
City Clerk

APPROVED AS TO FORM:

___________________________________
JOHN M. FUNK
City Attorney

I HEREBY CERTIFY that the foregoing Resolution was adopted by the City Council of the City of Downey at a regular meeting held on the 27th day of August, 2024, by the following vote, to wit:

AYES: Council Members:

NOES: Council Member:

ABSENT: Council Member:

ABSTAIN: Council Member:

MARIA ALICIA DUARTE, CMC
City Clerk