Cities Index.
02. PH Apprvl of Zone Change, Site Plan Review, Conditonal Use Permit, Variance, & Lot Meger for YMCA Dev

Downey City Council
September 24, 2024

Document
02. PH Apprvl of Zone Change, Site Plan Review, Conditonal Use Permit, Variance, & Lot Meger for YMCA Dev
Meeting
September 24, 2024
Body
Downey City Council
Pages
24
Original file
656 KB
Text extracted from the city's file for reading and search. Open the original on lf.downeyca.org. That file is the official record.

Item No.

TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: OFFICE OF THE CITY MANAGER
BY: IRMA HUITRON, DIRECTOR OF COMMUNITY DEVELOPMENT
D ATE: SEPTEMBER 24, 2024
SUBJECT: APPROVAL OF A ZONE CHANGE, SITE PLAN REVIEW, CONDITIONAL

USE PERMIT, VARIANCE, AND LOT MERGER TO FACILITATE THE
DEVELOPMENT OF A NEW 18,718 SQUARE FOOT YMCA FACILITY (PLN- 23-00168)

EXECUTIVE SUMMARY
The City Council will consider approving a request to construct an 18,718 square-foot YMCA facility on a 2.16-acre site. The applicant’s request includes consideration of a Zone Change, Site Plan Review, Conditional Use Permit, Variance, and Lot Merger. The project proposes changing the zoning classification from Open-Space (O-S) to Commercial Office (C-P) for the property at 11531 Downey Avenue. The zone change is requested as a clean-up item due to inconsistency with the General Plan designation for one of the parcels that is part of the proposed project site.

Staff recommends that the City Council approve the requested applications due to the project’s ability to make all necessary findings.

RECOMMENDATION
That the City Council:

1.INTRODUCE AN ORDINANCE APPROVING A ZONE CHANGE DESIGNATION

FROM O-S (OPEN SPACE) TO C-P (OFFICE) FOR THE PROPERTY LOCATED AT 11531 DOWNEY AVENUE,

2.ADOPT RESOLUTION NO. 24-8269, APPROVING A SITE PLAN REVIEW,

CONDITIONAL USE PERMIT, AND VARIANCE, THEREBY ALLOWING THE CONSTRUCTION OF A 18,718 SQUARE FOOT YMCA PARKS AND RECREATIONAL FACILITY AND 975 SQUARE FOOT GYMNASIUM ADDITION; AND,

3.ADOPT RESOLUTION NO. 24-8270, APPROVING A LOT MERGER FOR THE CONSOLIDATION OF THREE SEPARATE PARCELS (APNs: 6255-013-032, 6255- 013-033, AND 6255-013-034), LOCATED AT 11521 DOWNEY AVENUE, 11531 DOWNEY AVENUE, AND 8268 ARNETT STREET.

Agenda Page 1

YMCA – KOLAR FAMILY YMCA OF DOWNEY
SEPTEMBER 24, 2024
PAGE 2

BACKGROUND

The applicant, Rodrigo Abello, representing the YMCA, submitted the request for the development on May 21, 2024. After subsequent resubmittals and City Staff reviews, the application was deemed complete on July 23, 2024.

The application was heard by the Planning Commission at its regularly scheduled meeting of August 21, 2024. After considering all evidence and testimony provided at the public hearing and following deliberation, a motion to recommend approval to the City Council passed with a 4-0-1 vote.

Additionally, on November 14, 2023, a request to waive City fees associated with the development of the YMCA was heard by the City Council and passed with a 4-0-1 vote.

Site and Location

The 2.16-acre project site is located in central Downey at the southwest corner of Downey Avenue and Arnett Street. The subject property is currently owned and previously operated the YMCA of Los Angeles. The site is currently developed with a 60,927 square- foot YMCA building, and one single-family home. The site is comprised of three parcels (APNs: 6255-013-032, 6255-013-033, and 6255-013-034). Two of the parcel (11521 and 11531 Downey Avenue) currently make up the existing YMCA, and the third parcel (8268 Arnett Street) is an adjoining single-family parcel purchased to facilitate the development of the new YMCA facility. The buildings were constructed from 1947 to 1965, and no major renovations have taken place since that time. Lastly, the YMCA facility is currently vacant and previously operated from 1965 – 2020.

The properties directly to the north and east are also zoned CP and developed with professional offices, medical offices, legal nonconforming single-family residences, and a parking lot. The properties directly to the west are zoned Single-Family Residential (R-1) and developed with single-family homes. Lastly, the property directly to the south is zoned Multifamily Residential (R-3) and developed with apartments.

Figure A – Street View of Downey Frontage

Agenda Page 2

YMCA – KOLAR FAMILY YMCA OF DOWNEY
SEPTEMBER 24, 2024
PAGE 3

Figure B – Street View of Arnett Street Frontage

Figure C - Aerial and Surrounding Uses

Subject Site
Multifamily
Office
Single Family
Single Family
Single Family
Office
Parking Lot
Agenda Page 3

YMCA – KOLAR FAMILY YMCA OF DOWNEY
SEPTEMBER 24, 2024
PAGE 4

ANALYSIS
Zone Change

The project includes a request to amend the Zoning designation for the property located at 11531 Downey Avenue (APN 6255-013-032) from the Open Space (OS) zone to the Professional Office (CP) zone. The request is needed in order to correct inconsistencies between the City’s Zoning Map and General Plan Designation Map. The General Plan Designation for all three subject properties is Office (O). The corresponding appropriate land use zoning designation for the General Plan designation of Office is the CP zone.

The request is a corrective matter and does not bestow any special privilege upon the property that would not otherwise be permissible in the current zoning designation.

Existing Zoning Proposed Zoning
Figure D – Existing and Proposed Zoning Designation

Site Plan Review

The changes to the existing site include the demolition of 53,302 square feet of the existing building and preservation of an existing 7,625 square foot gymnasium. The proposed new development would consist of an 18,718 square-foot, 27-foot-high YMCA recreational use facility. The site would be developed with various buildings with the following components: office space, swimming pool, fitness center, multipurpose room, basketball gymnasium, restrooms, locker rooms, and storage area.

Major development standards and project components are as follows:

Table 1
Development Standards
Standard Proposed Compliance
Lot Size 6,000 sq. ft.
(Minimum)

2.16 Acres
(94,089.6 sq. ft.)
Yes
Agenda Page 4

YMCA – KOLAR FAMILY YMCA OF DOWNEY
SEPTEMBER 24, 2024
PAGE 5

Table 1
Development Standards
Standard Proposed Compliance
Lot Coverage 50% (Maximum) 28% Yes
Floor Area Ratio 2.0 (Maximum) .28 Yes
Setbacks:

Front
Rear
Interior Side
Street Side

10 ft.
46 ft.
5 ft.
10 ft.

10 ft.

13.33 ft. (Variance Request)
185 ft.
10 ft.

Yes
No*
Yes
Yes
Building Height 75 ft.
27 ft. Main Structure

25.84 ft. - 30.66 ft. Gymnasium
(Variance Request)
Yes
No*
Parking 93 Spaces
1/300 sq. ft.
(Health Club)
3 per Sports Court
93 Standard
5 Compact
Yes
Landscaping 10% of site 10% of site (9,434 sq. ft.) Yes *Variance would apply to Gymnasium only.

Table 2
Additional Project Components
Building
Two Recreational Use Facilities:
1) One 18,718 sq. ft. main YMCA
facility (includes: offices, fitness
center, multipurpose room, and
basement)
2) One existing 7,625 sq. ft. basketball
gymnasium with a 975 sq. ft.
addition
Architectural Style Contemporary
Ingress/Egress Two total driveways: one along Downey
Avenue and one along Arnett Street

Architecture

The proposed design of the building is most closely characterized as contemporary style architecture. The new main building would incorporate various materials, including heavy glazing, metal panels, faux wood tiles, rustic block, and concrete. The entrance of the facility and the primary elevation facing Downey Avenue are shown below as Figure D.

The frontage of the proposed building facing Arnett Street is shown below as Figure E.

Agenda Page 5

YMCA – KOLAR FAMILY YMCA OF DOWNEY
SEPTEMBER 24, 2024
PAGE 6

The existing gymnasium to the rear of the property would maintain its existing red brick masonry aesthetic with accent concrete columns.

Figure D – Rendering of Building Entrance (left) and Downey Street Frontage (right)

Access, Circulation, and Parking

The site is accessible from two frontages, on Downey Avenue and Arnett Street, with one driveway opening on each street frontage. Both driveway openings are 26’ wide. The drive aisle widths surrounding the building and in the parking lot are no less than 26’ wide, which allows for maneuvering throughout the site for emergency vehicles.

The site would accommodate 93 standard parking spaces and 5 compact spaces.

Amongst the parking spaces, there will be accessible parking spaces and electric vehicle charging spaces. The parking provided complies with the requirements of the Downey Municipal Code (DMC) and is detailed in Table 1 of this report.

Conditional Use Permit

A CUP for the YMCA facility is required due to the proposed land use classification. As described by the applicant, proposed activities to occur onsite include: Sports and Teen Leadership programs, Academic Enrichment and Support, Water Safety and Drowning Prevention for children, teens, and adults, and healthy lifestyle programs for mind, body, and spirit for all ages. Added activities include pickle-ball and basketball, as well as sporting competitions.

Agenda Page 6

YMCA – KOLAR FAMILY YMCA OF DOWNEY
SEPTEMBER 24, 2024
PAGE 7

The YMCA facility would have approximately 100 employees to operate the site and up to 10 employees present at any given time. The hours of operation are noted below in Table 3.

Table 3
Hours of Operation
Monday - Friday 6:00 am – 9:00 pm
Saturday 8:00 am – 4:00 pm
Sunday 12:00 pm – 5:00 pm

Variance

The proposed variance is a request to deviate from DMC Section 9410.12(c). The variance is requested in order to retain the gymnasium structure in its current legal non- conforming location with a rear setback of 13.33’ (feet) and height of 25.83’ (feet). Strict compliance with the code would otherwise mean that the structure relinquishes all legal nonconforming privileges and requires that a larger portion of the existing structure be demolished to accommodate a required 46’ (foot) rear setback.

A variance request is prompted due to the amount of proposed demolition of the existing structure. In summary, DMC section 9410.12(c) allows the continuance of legal nonconformities when less than 50% of a structure is being demolished. In this particular case, the project proposes the demolition of 53,302 square feet which constitutes roughly

87.5% of the existing structure. Therefore, the existing structure is required to comply with all current development standards and may not retain a 13.33’ rear setback or height of

25.83’.

The variance is deemed necessary because the existing YMCA facility presents a unique circumstance related to how the site is operated and was constructed. The existing YMCA facility appears to be one structure because all of its separate components are attached.

However, the overall facility presents a unique circumstance because various portions of its structure rely on completely independent structural and architectural components.

Unlike a traditional structure, the gymnasium is more so built as a separate abutting structure. The gymnasium is completely enclosed and sustained by its own individual walls and foundation. In addition, the gymnasium could remain in place without any support from surrounding structures or retrofitting. Therefore, because the gymnasium can stand independently, it is reasonable to determine that it is a separate structure from the rest of the overall YMCA building. In this case, the gymnasiums’ setback may be granted, through a variance, with the same legal nonconforming rights granted to detached standalone structures. If the gymnasium were completely detached, then DMC Section 9410.12(c) would not apply, and the structure would be able to remain in place by right. Therefore, once again the particular way in which the structure was designed Agenda Page 7

YMCA – KOLAR FAMILY YMCA OF DOWNEY
SEPTEMBER 24, 2024
PAGE 8

and built presents a unique circumstance that supports the approval of the requested variance.

Lot Merger

The applicant proposes the consolidation of three separate Assessor’s Parcel Numbers (6255-013-032, 6255-013-033, AND 6255-013-034). The combined area of the lots is

2.16 acres. The parcels are legally established and can be found as Parcels 1, 2, 3, 4 and 5 as recorded in Deed Book 1, Pages 156 and 158. The parcels are also identified as lots 32, 33, and 34 in the assessor’s book number 6255 Page 13 of the County of Los Angeles. The proposed legal description and map are provided in Attachment H of this report.

California Environmental Quality Act

The City reviewed the environmental impacts of the proposed project pursuant to California Environmental Quality Act (CEQA). It was determined that this request is categorically exempt from CEQA, pursuant to Guideline Section No. 15332 (Class 32 – In-fill Development Projects). Class 32 exemptions consist of projects in urban areas on lots equal to or less than 5 acres and that do not present any potential to produce an environmental impact.

A series of technical studies were submitted to support the above environmental determination. The studies find that the project will not produce any significant impact related to Noise, Air Quality and Greenhouse Gas Emissions, Cultural Resources, and Traffic. The studies are provided in this report as Attachment I, Exhibits B-F.

Public Comment

As of the preparation of this report, staff received written correspondence from one individual requesting that the existing red curb along the south bound lane of Downey Avenue at the intersection of Downey Avenue be extended to increase visibility for drivers making right turns. A copy of the public comment is included in Attachment K.

PROJECT TIMELINE

The YMCA facility construction is anticipated to begin in October of 2024 with a grand opening tentatively scheduled for April 2026.

CITY COUNCIL PRIORITIES

Economic Vibrancy
Quality of Life, Safety and Infrastructure

Agenda Page 8

YMCA – KOLAR FAMILY YMCA OF DOWNEY
SEPTEMBER 24, 2024
PAGE 9

BOARD/COMMISSION/SUBCOMMITTEE ACTION:

The application was previously heard by the Planning Commission at its regularly scheduled meeting of August 21, 2024. After considering all evidence and testimony provided at the public hearing, and following deliberation, a motion to recommend approval to the City Council passed with a 4-0-1 vote.

FISCAL IMPACT

There is no fiscal impact.

ATTACHMENTS

Attachment A: Vicinity Map
Attachment B: Draft Ordinance– Zone Change (ZC)
Attachment C: Draft Resolution No. 24-8269 (Site Plan Review, Conditional Use Permit, And Variance)
Attachment D: Draft Resolution No. 24-8270 (Lot Merger) Attachment E: Letter of Operations
Attachment F: Plans
Attachment G: Renderings
Attachment H: Lot Merger
Attachment I: CEQA Exemption Technical Studies
• Exhibit A - Categorical Exemption Memo
• Exhibit B - Noise Assessment
• Exhibit C - Air Quality and Greenhouse Gas Assessment • Exhibit D - Cultural Resources Study
• Exhibit E - Trip Generation Assessment
• Exhibit F - Vehicle Miles Traveled (VMT) Evaluation
Attachment J: Staff Memos – Peer Review of Trip Generation Assessment and VMT Evaluation
Attachment K: Public Comments
Attachment L: Planning Commission Staff Report August 21, 2024

Agenda Page 9

LOCATION MAP

AERIAL PHOTOGRAPH
Subject Site
Attachment A
Agenda Page 10

ZONING MAP

Subject Site
R-1
R-3

H-M
M-2
Attachment A
Agenda Page 11

ORDINANCE NO. __________

AN ORD INANCE OF THE CITY COUNCIL OF THE CITY OF DOWNEY

APPROVING A ZONE CHANGE DESIGNATION FROM O-S (OPEN SPACE) TO C-P (OFFICE) FOR THE PROPERTY LOCATED AT 11531 DOWNEY AVENUE WHEREAS, on May 21, 2024, the applicant, Rodrigo Abello (a representative of YMCA of Los Angeles), formally submitted a request for a Zone Change, Site Plan Review, Conditional Use Permit, Variance, and Lot Merger, to construct a new 18,718 square foot YMCA parks and recreational facility at 11521 Downey Avenue, 11531 Downey Avenue, and 8268 Arnett Street (“Project”); and
WHEREAS , on June 21, 2024, the applicant was issued a letter deeming the application incomplete; and
WHEREAS , on July 23, 2024, upon review of all required materials submitted, the applicant was issued a letter deeming the application complete; and WHEREAS, on August 8, 2024, notices of a Planning Commission public hearing for a Zone Change, Site Plan Review, Conditional Use Permit, Variance, and Lot Merger were sent to all tenants and property owners within 500 feet of the subject site, and the public hearing notice was published in Downey Patriot; and,
WHEREAS, the Planning Commission held a duly noticed public hearing on August 21 , 2024, and after fully considering all oral and written testimony, facts, and opinions, adopted Resolution No. 24-4035 recommending approval of a zone change to the City Council for the Project, as well as Resolution 24-4036 recommending approval of a Site Plan Review, Conditional Use Permit, and Variance, and Resolution 24-4037 recommending approval of a Lot Merger; and WHEREAS, the City Council held a duly noticed public hearing on September 24, 2024, to fully consider all oral and written testimony and facts and opinions regarding the Zone Change, Site Plan Review, Conditional Use Permit, Variance, and Lot Merger.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF DOWNEY, CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS:

SE CTION 1. The City Council of the City of Downey hereby finds, determines, and declares as follows:

A.The zone change for the Project is necessary and desirable for the development of the community in harmony with the objectives of the General Plan and Chapter 8 of Article IX of the Downey Municipal Code and is in the interests or furtherance of the public health, safety, and general welfare. The City Council adopted a comprehensive update to the General Plan on January 25, 2005, which identifies the subject property within the designation of Office (O). The current zoning for the property is designated as Open Space (O-S), which is not the corresponding zoning for the General Plan Designation of Office.

The zone change from O-S to C-P (Commercial Office) will make the zoning for the site consistent with the General Plan. Furthermore, the zone change for this property does not grant the subject property any added liberties it did not previously already have. Therefore, with this action there is no opportunity to negatively affect the public health, safety, or general welfare of the community.

Attachment B
Agenda Page 12

ORDINANCE NO.

PAGE 2
B. The zone change will be compatible and complementary to existing conditions and adjoining property in the surrounding area. Nearby commercially developed properties along Downey Avenue are appropriately zoned C-P. The in tent of the zone change is to remove the inconsistent O-S zone and provide a compatible zoning designation of C-P.

This is ultimately compatible with the existing and proposed use on the subject property.

It is also compatible with the surrounding area, as nearby properties located to the North and East along Downey Avenue are also zoned C-P and developed with commercial office uses.

C. The site is adequate in size to accommodate the uses permitted in the requested zone and complies with all applicable property development standards. The 2.16-acre site is substantially greater than the minimum required lot size of 6,000 square feet for the C-P zone. The minimum lot size is established in part to ensure sites can appropriately meet development standards and accommodate allowed uses. Furthermore, the proposed development filed in conjunction with the zone change request will comply with all applicable development standards.

D. The site properly relates to streets and highways designed and fully improved to carry the type and quantity of traffic that is expected to be generated in the area, and utilities exist or are planned which will adequately serve the property as rezoned. Changing the zoning from O -S to C-P does not bestow upon the property an opportunity to develop the site in a way that would not otherwise be allowed in either zoning designation. Therefore, the adjoining road segments were intended to serve developments such as the proposed new YMCA facility. In addition, the proposed development request filed in conjunction with this zone change request is smaller in size than the original YMCA facility proposed to be demolished. The new development will incorporate more efficient circulation within the lot and egress and ingress for the site. Lastly, per a traffic analysis conducted for the new YMCA facility, the project is anticipated to produce a net decrease of 608 daily vehicles trips. Therefore, level of service for nearby road segments will not be altered.

E. The proposed zone change is in general conformance with the General Plan and General Plan land use designation for the parcel. The Zone Change to C-P will align the zoning map with the appropriate corresponding General Plan Designation of Office (O).

SECTION 2. The City Council further finds, determines and declares that the proposed project was reviewed for compliance with the California Environmental Quality Act (CEQA), and is categorially exempt from CEQA, pursuant to CEQA Guidelines Section 15332 (Class 32 – In- fill Development Projects). Class 32 exemptions consist of projects characterized as in-fill development meeting the following conditions: the project is consistent with the applicable general plan and zoning designations; the proposed development occurs within city limits on a site of no more than 5 acres substantially surrounded by urban uses; the project site has no value as habitat for endangered, rare, or threatened species; approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality; and the site can be adequately served by all required utilities and public services.

SECTION 3. Based on the findings set forth in Section 1 and Section 2 of this Ordinance, the City Council hereby determines property located at 11531 Downey Avenue is hereby rezoned from O-S (Open Space) to C-P (Professional Office), as outlined in Exhibit ‘A’ of this Ordinance.

SECTION 4. If any section, subsection, sentence, clause, phrase or portion of this Ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Attachment B
Agenda Page 13

ORDINANCE NO.

PAGE 3
ordinance. The City Council of the City of Downey hereby declares that it would have adopted this ordinance and each section, subsection, sentence, clause, phrase or portion thereof irrespective of the fact that any one or more sections, subsections, sentences, clauses, phrases, or portions be declared invalid or unconstitutional.

SECTION 5. This Ordinance shall become effective thirty (30) days after its adoption.

SECTION 6. The City Clerk shall certify the adoption of this Ordinance

APPROVED AND ADOPTED this ___ day of ________ 2024.

________________________
MARIO TRUJILLO, Mayor

ATTEST:

____________________________

MARIA ALICIA DUARTE, CMC
City Clerk

APPROVED AS TO FORM:

_____________________________
JOHN M. FUNK
City Attorney

I HEREBY CERTIFY that the foregoing Resolution No. 24-___ was introduced at a Regular Meeting of the City Council of the City of Downey held on the 24th day of September, 2024, and adopted at a Regular Meeting of the City Council of the City of Downey held on the ___ day of ___, 2024, by the following vote to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

___________________________________

MARIA ALICIA DUARTE, CMC
City Clerk
Attachment B
Agenda Page 14

ORDINANCE NO.

PAGE 4
EXHIBIT A – ZONE CHANGE MAP

Existing Zoning

Proposed Zoning

C-P
Attachment B
Agenda Page 15

RESOLUTION NO. 24-8269

A RE SOLUTION OF THE CITY COUNCIL OF THE CITY OF DOWNEY

APPROVING A SITE PLAN REVIEW, CONDITIONAL USE PERMIT, AND VARIANCE, THEREBY ALLOWING THE CONSTRUCTION OF A 18,718 SQUARE FOOT YMCA PARKS AND RECREATIONAL FACILITY AND 975

SQUARE FOOT GYMNASIUM ADDITION
WHEREAS, on May 21, 2024, the applicant, Rodrigo Abello (a representative of YMCA of Los Angeles), formally submitted a request for a Zone Change, Site Plan Review, Conditional Use Permit, Variance, and Lot Merger, to construct a new 18,718 square foot YMCA parks and recreational facility at 11521 Downey Avenue, 11531 Downey Avenue, and 8268 Arnett Street (“Project”); and
WHEREAS, on June 21, 2024, the applicant was issued a letter deeming the application incomplete; and
WHEREAS, on July 23, 2024, upon review of all required materials submitted, the applicant was issued a letter deeming the application complete; and WHEREAS, on August 8, 2024, notices of a Planning Commission public hearing for a Zone Change, Site Plan Review, Conditional Use Permit, Variance, and Lot Merger were sent to all tenants and property owners within 500 feet of the subject site, and the public hearing notice was published in Downey Patriot; and
WHEREAS, the Planning Commission held a duly noticed public hearing on August 21, 2024, and after fully considering all oral and written testimony, facts, and opinions, adopted Resolution No. 24-403 6 recommending approval of a Site Plan Review, Conditional Use Permit, and Variance by the City Council for the Project, as well as Resolution 24-4035 recommending approval of a Zone Change and Resolution 24-4037 recommending approval of a Lot Merger; and
WHEREAS, the City Council held a duly noticed public hearing on September 24, 2024, to fully consider all oral and written testimony and facts and opinions regarding the Zone Change, Site Plan Review, Conditional Use Permit, Variance, and Lot Merger.

NOW, THEREFO RE, THE CITY COUNCIL OF THE CITY OF DOWNEY, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS:

SE CTION 1. The City Council of the City of Downey hereby finds, determines, and declares as follows regarding the Site Plan Review:

A.The site plan is consistent with the goals and polices embodied in the General Plan and other applicable plans and policies adopted by the City Council. The proposed YMCA parks and recreational facility is in harmony and does not adversely affect the goals and policies outlined in the City’s General Plan. In addition, the project’s objective to revitalize the site helps achieve various long-term goals. Specifically, the following policies are promoted by the proposed development:

Policy 1.1.1 – Maintain a Balance of Land Uses
Program 9.1.1.5 – Continue the revitalization of commercial and industrial Attachment C
Agenda Page 16

Resolution No. 24 -8269

Page 2 ends

corridors.

The site is located within a commercial general plan designation and was originally developed between the years of 1947 and 1965. The new proposed parks and recreational facility will revitalize the site with a new contemporary building, landscaping, and improved vehicular circulation, which will improve the overall aesthetic of the subject property.

Policy 1.1.3 – Provide and appropriate amount of land area for business and employment.

Program 1.1.3.1 – Encourage land uses that generate jobs.

Policy 9.2.1 – Promote job-generating land uses.

Program 9.2.1.3 – Promote employment that increases the daytime population of the city creating customer demand for other businesses.

Program 9.2.2.1 – Promote a diversified employment base with jobs in sectors in addition to retail sales.

The project is anticipated to create 100 permanent jobs.

City Value – To provide excellent housing, educational, employment, and recreational
opportunities.

Program 1.1.5.3 – Promote recreation and entertainment uses that serve needs of the
public.

The site plan promotes the above policies by introducing a unique commercial recreation facility within the city, and adds to the amount of recreational options available to residents.

Goal 6.1 – Protect persons from exposure to excessive noise.

Policy 6.1.1 – Minimize noise impacts onto noise-sensitive uses.

Program 6.1.1.2 – Ensure that new developments within areas with exterior noise at unacceptable levels are designed to maintain interior noise levels at acceptable levels.

Goal 6.3 – Minimize noise impacts on noise-sensitive land uses.

Policy 6.3.1 – Minimize the amount of noise generated by land uses.

Program 6.3.1.1 – Discourage proposed land uses from generating noise at [un]acceptable levels.

As part of the project, a Noise Study identified that the development while in operation, will not generate noise beyond the levels allowed within the Downey Municipal Code.

Noise levels generated by temporary construction and long-term operations will not exceed the City’s noise ordinance. Construction activity is expected to produce noise at a maximum level of 78.8 dBA. The DMC restricts construction noise to between 7:00 a.m. and 9:00 p.m., with a maximum level of 85 dBA at property boundaries.

Attachment C
Agenda Page 17

Resolution No. 24 -8269

Page 3 ends

Long term operational noise will occur from the pickleball court, rooftop air conditioning units, and vehicle noise from the parking lot. Operational noise levels will peak at 47.8 dBA during the day and 43.0 dBA at night. The DMC restricts noise in proximity to residential zones to a maximum of 55 dBA during the day, and 45 dBA at night. Additionally, in an effort to control noise, the Project will feature a 10-foot Acoustifence around the pickleball court and will close it at night.

Goal 8.1 – Promote quality design for new, expanded, and remodeled Construction.

Policy 8.1.1 – Promote architectural design of the highest quality.

Program 8.1.1.1 – Discourage construction with architectural design of poor quality.

Goal 8.3 – Promote the enhancement of the streetscape.

Policy 8.3.1.1 – Enhance the views of property from the public streets to exhibit a positive image.

Program 8.3.1.1 – Promote prevailing street yard setbacks for buildings consistent with adjacent properties.

Program 8.3.1.2 – Maximize the landscaped setback on street yard Setbacks.

The proposed architecture is a significant upgrade to the existing vacant parks and recreational facilities on site and is compatible with surrounding properties. The proposed project would be newer than most developments within its proximity in regard to proposed quality of design, site layout, and landscaping. The site has remained relatively the same since 1965 and is surrounded by a mix of older single-family, multi-family, and commercial properties. The redevelopment of this site can serve as an example of higher quality architecture for future developments within the city, and directly enhances the surrounding area.

B. The proposed development is in accordance with the purposes and objectives of Article IX of the Downey Municipal Code (Land Use) and the zone in which the site is located. The purpose of the C-P (Commercial Office) zone, as stated in the Downey Municipal Code, “is intended to provide for the development of integrated office and professional areas wherein related types of uses and facilities may also be located. The provisions of this zone are intended to encourage the most desirable relationship of permitted uses and to provide a transition between more intensive commercial activities and residential areas.” The proposed YMCA parks and recreational facility aims to provide a service to the community, and in particular nearby residential properties. In addition, the proposed facility will operate from 6:00 am – 9:00 pm on weekdays, 8:00 am – 4:00 pm on Saturdays, and 12:00 pm – 5:00 pm on Sundays. These hours are compatible with nearby residential uses. Therefore, the proposal application is found to be in conformance with the purpose statement above.

C. The proposed development’s site plan and its design features, including architecture and landscaping, will integrate harmoniously and enhance the character and design of the site, the immediate neighborhood, and the surrounding areas of the City. The proposed design of the project will integrate harmoniously with the surrounding area by providing aesthetically pleasing architecture and landscaping. The proposed 18,718 square foot building will serve as a significant Attachment C
Agenda Page 18

Resolution No. 24 -8269

Page 4 ends

upgrade from the existing facility on the site and nearby community. In addition, the streetscape will be enhanced as well as the transition from the street onto the site through the proposed landscaping and upgraded vehicle approaches.

D. The site plan and location of the buildings, parking areas, signs, landscaping, luminaries, and other site features indicate that proper consideration has been given to both the functional aspects of the site development, such as automobile and pedestrian circulation, and the visual effects of the development from the view of the public streets. The project design incorporates the DMC required amount of parking and landscaping, including quantity of parking, quantity of trees, landscaping square footage, setbacks, parking stall dimensions, and ADA parking.

In addition, the driveway approaches and on-site drive-aisles are 26’ wide and provide adequate amount space for emergency vehicles to maneuver throughout the lot. Lastly, the photometric plan proposed for this project shows that all parts of the site will be well illuminated while simultaneously not causing any nuisance to the neighboring properties or public right-of-way. Therefore, it is determined that proper consideration has been given to the functional aspects and visual effects of the development.

E. The proposed development will improve the community appearance by preventing extremes of dissimilarity or monotony in new construction or in alterations of facilities. The proposed project reflects true contemporary style architecture and keeps with a scale consistent of smaller scale commercial development. The height and size of structure will be significantly smaller than the current structure on site. The proposed architectural style utilizing various types of materials, glazing, colors, and multiple roof heights is neither dissimilar nor monotonous from other buildings in the area, and this project will upgrade the overall appearance of the site and, in turn, improve the community appearance. This proposed development elevates the quality of design of all commercial properties within the City.

F. The site plan and design considerations shall tend to upgrade properties in the immediate neighborhood and surrounding areas with an accompanying betterment of conditions affecting the public health, safety, comfort, and welfare. The proposed architecture is a significant upgrade to the existing facilities on site and is compatible with surrounding properties although it will be newer than most developments within its proximity. In addition, the redevelopment of this site has the potential to serve as an example of higher quality architecture for future non- residential development within the City of Downey. Lastly, the operational procedures of the proposed development are also conditioned in an effort to ensure that any potential effects in public health, safety, comfort and general welfare are mitigated as much as possible.

G. The proposed development’s site plan and its design components will include graffiti-resistant features and materials in accordance with the requirements of Section 4960 of Chapter 10 of Article IV of the Downey Municipal Code. The project has been conditioned to meet the requirements specified in Section 4960 of the Downey Municipal Code. Section 4960 discusses the installation of anti-graffiti materials and the appropriate allotted time limit for the removal of graffiti.

Attachment C
Agenda Page 19

Resolution No. 24 -8269

Page 5 ends

SECTION 2. The City Council of the City of Downey hereby further finds, determines, and declares as follows regarding the Conditional Use Permit:

A. The requested Conditional Use Permit will not adversely affect the intent and purpose of Article IX of the Downey Municipal Code (Land Use) or the City's General Plan or the public convenience or general welfare of persons residing or working in the neighborhood thereof. The project is consistent with all applicable goals and policies specified in the City’s General Plan, as well as policies stated in the Downey Municipal Code. Environmental assessments conducted for the project indicate the project will not produce impacts, as they relate to Noise, Air Quality and Greenhouse Gas Emissions, Cultural Resources, and Traffic. The subject site is able to meet the parking demands of the proposed use, thus no parking impacts are expected. In addition, the owners also own an adjacent parking lot that is intended to be utilized for additional parking. The project helps achieve long term goals within the City’s General Plan by providing additional recreational services to the community. The following policies are promoted by the proposed CUP:

City Value – To provide excellent housing, educational, employment, and recreational
opportunities.

Program 1.1.5.3 – Promote recreation and entertainment uses that serve needs of the public.

The CUP promotes the above policies by preserving a unique parks and recreational facility that was previously present within the city from 1965 to 2020, and will continue to contribute to the amount of recreational options available to residents.

B. The requested use will not adversely affect the adjoining land uses and the growth and development of the area in which it is proposed to be located. The proposed use will be compatible with, and intends to compliment, other uses within the nearby commercial and residential areas. Parks and recreational facilities are common found near residential properties and intend to directly serve the adjacent community. In addition, it is anticipated the use will not adversely affect surrounding properties because the use, and conditions applicable to the use, can be classified as a less intensive use than others allowed in commercial zones. The intensity, or lack of, is ideal for the Commercial Office (C-P) zone in that it creates a buffer between sensitive uses and larger more instance commercial uses.

Conditions of approval have been incorporated in an effort to ensure compatibility with existing and future uses, as well as mitigate any potential impacts.

C. The size and shape of the site proposed for the use is adequate to allow the full development of the proposed use in a manner not detrimental to the particular area. The request for the proposed scope of work does not include changes to any lots outside of the subject site, or work required in the public right-of -way. In addition, the proposed use is in compliance with the Downey Municipal Code, including adequate parking requirements. The proposed work does not create alterations that would restrict an existing use located within the nearby area from continuing to use their property as currently developed, and does not restrict those properties from altering their structures or operations. Lastly, the new use will Attachment C
Agenda Page 20

Resolution No. 24 -8269

Page 6 ends

decrease in overall size in comparison to the previous use on site. Therefore, the size and shape of the site proposed for the use is adequate to allow the full development of the proposed use in a manner not detrimental to the particular area.

D. The traffic generated by the proposed use will not impose an undue burden upon the streets and highways in the area. A traffic analysis conducted as part of the requirements for the project found that the project would produce a net decrease of 608 daily vehicles trips. This means that the level of service for nearby road segments will not be altered, and no undue burdens to nearby streets or highways will occur as a result of the project.

SECTION 3. The City Council of the City of Downey hereby further finds, determines, and declares as follows regarding the Variance:

A. Exceptional or extraordinary conditions or circumstances exist which are peculiar to the land, structure, or building involved and which are not generally applicable to other lands, structures, or buildings in the same vicinity and zone. The YMCA facility presents a unique circumstance related to how the site is operated and was constructed. The existing YMCA facility appears to be one structure because all of its separate components are attached. However, the overall facility presents a unique circumstance because various portions of its structure rely on completely independent structural and architectural components. Unlike a traditional structure, the gymnasium is more so built as a separate abutting structure. The gymnasium is completely enclosed and sustained by its own individual walls and foundation. In addition, the gymnasium could remain in place without any support from surrounding structures or retrofitting. Therefore, because the gymnasium can stand independently, it is reasonable to determine that it is a separate structure from the rest of the overall YMCA building. In this case, the gymnasiums’ setback may be granted, through a variance, with the same legal nonconforming rights granted to detached standalone structures. If the gymnasium were completely detached, then DMC Section 9410.12(c) would not apply and the structure would be able to remain in place by right. Therefore, once again the particular way in which the structure was designed and built presents a unique circumstance that supports the approval of the requested variance.

B. The literal interpretation of the provisions of Article IX of the Downey Municipal Code (Land Use) would deprive the applicant of rights under the terms of this article commonly enjoyed by other properties in the same vicinity and zone in which the property is located. The direct request is for the YMCA gymnasium to be granted to retain its current legal nonconforming rights, the same rights applicable to detached structures. If the gymnasium were completely detached. then DMC Section 9410.12(c) would not apply and the structure would be able to remain in place by right. The particular way in which the structure was designed and built presents a unique circumstance that supports the approval of the requested variance. Much like a detached structure, the gymnasium is completely enclosed and sustained by its own individual walls and foundation. The gymnasium could remain in place without any support from surrounding structures or retrofitting.

Therefore, approval of the variance would allow the gymnasium the same privileges commonly enjoyed by other properties with detached structures.

Attachment C
Agenda Page 21

Resolution No. 24 -8269

Page 7 ends

C. Exceptional or extraordinary conditions or circumstances do not result from the actions of the applicant. The YMCA gymnasium was constructed in 1965 under the applicable development standards at the time. At that time, the developer could not have known that the gymnasium would need to be demolished under future development standards in order to upgrade the site. Therefore, the exceptional or extraordinary circumstances are not reasonably due to the actions of the applicant.

D. Granting the Variance requested will not confer on the applicant any special privilege that is denied by Chapter 8 of Article IX of the DMC to other lands, structures, or buildings in the same vicinity and zone in which the property is located. It is assumed that all similar structures, with equal characteristics, would make the same request in order to preserve a structure that can structurally stand and operate independently from other abutting structures.

Unlike a traditional structure, the gymnasium is built much like a separate abutting structure. The gymnasium is completely enclosed and sustained by its own individual walls and foundation. The gymnasium could remain in place without any support from surrounding structures or retrofitting. Therefore, because the gymnasium can stand independently it is reasonable to determine that it is a separate structure from the rest of the overall YMCA building. In this case, the gymnasiums’ setback and height may be granted, through a variance, the same legal nonconforming rights granted to detached standalone structures in other lands, structures, or buildings in the same vicinity and zone.

E. The granting of a Variance will be in harmony and not adversely affect the General Plan of the City. The proposed facility is in harmony and does not adversely affect the goals and policies outlined in the City’s General Plan. Furthermore, the continuation of nonconforming setbacks and height for the gymnasium does not directly, or inadvertently, contradict any of the aforementioned goals and policies.

Alternatively, the facility in general will promote the following:

Policy 1.1.1 – Maintain a Balance of Land Uses
Program 9.1.1.5 – Continue the revitalization of commercial and industrial corridors.

The site is located within a commercial general plan designation and was originally developed between the years of 1947 and 1965. The new proposed parks and recreational facility will revitalize the site with a new contemporary building, landscaping, and improved vehicular circulation which will improve the overall aesthetic of the subject property.

Policy 1.1.3 – Provide and appropriate amount of land area for business and employment.

Program 1.1.3.1 – Encourage land uses that generate jobs.

Policy 9.2.1 – Promote job-generating land uses.

Program 9.2.1.3 – Promote employment that increases the daytime population of the city creating customer demand for other businesses.

Program 9.2.2.1 – Promote a diversified employment base with jobs in sectors in addition to retail sales.

The project is anticipated to create 100 permanent jobs.

Attachment C
Agenda Page 22

Resolution No. 24 -8269

Page 8 ends

City Value – To provide excellent housing, educational, employment, and recreational
opportunities.

Program 1.1.5.3 – Promote recreation and entertainment uses that serve needs of the
public.

The Variance promotes the above policies by introducing a unique recreation facility within the city, and adds to the amount of recreational options available to residents and mall patrons.

Goal 6.1 – Protect persons from exposure to excessive noise.

Policy 6.1.1 – Minimize noise impacts onto noise-sensitive uses.

Program 6.1.1.2 – Ensure that new developments within areas with exterior noise at unacceptable levels are designed to maintain interior noise levels at acceptable levels.

Goal 6.3 – Minimize noise impacts on noise-sensitive land uses.

Policy 6.3.1 – Minimize the amount of noise generated by land uses.

Program 6.3.1.1 – Discourage proposed land uses from generating noise at [un]acceptable levels.

As part of the project, a Noise Study identified that the development while in operation, will not generate noise beyond the levels allowed within the Downey Municipal Code.

Noise levels generated by temporary construction and long-term operations will not exceed the City’s noise ordinance. Construction activity is expected to produce noise at a maximum level of 78.8 dBA. The DMC restricts construction noise to between 7:00 a.m. and 9:00 p.m., with a maximum level of 85 dBA at property boundaries.

Long term operational noise will occur from the pickleball court, rooftop air conditioning units, and vehicle noise from the parking lot. Operational noise levels will peak at 47.8 dBA during the day and 43.0 dBA at night. The DMC restricts noise in proximity to residential zones to a maximum of 55 dBA during the day, and 45 dBA at night. Additionally, in an effort to control noise, the Project will feature a 10-foot Acoustifence around the pickleball court and will close it at night.

Goal 8.1 – Promote quality design for new, expanded, and remodeled Construction.

Policy 8.1.1 – Promote architectural design of the highest quality.

Program 8.1.1.1 – Discourage construction with architectural design of poor quality.

Goal 8.3 – Promote the enhancement of the streetscape.

Policy 8.3.1.1 – Enhance the views of property from the public streets to exhibit a positive image.

Program 8.3.1.1 – Promote prevailing street yard setbacks for buildings consistent with adjacent properties.

Program 8.3.1.2 – Maximize the landscaped setback on street yard Attachment C
Agenda Page 23

Resolution No. 24 -8269

Page 9 ends

Setbacks.

The proposed architecture is a significant upgrade to the existing vacant parks and recreational facilities on site and is compatible with surrounding properties. The proposed project would be newer than most developments within its proximity in regard to proposed quality of design, site layout, and landscaping. The site has remained relatively the same since 1965 and is surrounded by a mix of older single-family, multi-family, and commercial properties. The redevelopment of this site can serve as an example of higher quality architecture for future developments within the city, and directly enhances the surrounding area.

F. The reasons set forth in the application justify the granting of the variance and the variance is the minimum variance that will make possible the reasonable use of the land, building, or structure. The main reason is that the design and operation of the gymnasium resembles a detached structure. Detached structures would not be subject to the provisions of Downey Municipal Code Section 9410.12(c), and would be allowed by-right to maintain their legal nonconforming status. As the YMCA gymnasium shares many of the same characteristics as a separate standalone detached structure, it is justified for the gymnasium to be granted the same legal nonconforming rights.

SECTION 4. The City Council further finds, determines and declares that the proposed project was reviewed for compliance with the California Environmental Quality Act (CEQA), and is categorially exempt from CEQA, pursuant to CEQA Guidelines Section 15332 (Class 32 – In- fill Development Projects). Class 32 exemptions consist of projects characterized as in-fill development meeting the following conditions: the project is consistent with the applicable general plan and zoning designations; the proposed development occurs within city limits on a site of no more than 5 acres substantially surrounded by urban uses; the project site has no value as habitat for endangered, rare, or threatened species; approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality; and the site can be adequately served by all required utilities and public services. .

SECTION 5. Based upon the findings set forth in Sections 1 through 4 of this Resolution, the City Council hereby approve s the Site Plan Review, Conditional Use Permit, and Variance (PLN-23-00168 ) for the Project, subject to conditions of approval attached hereto as Exhibit ‘A’, which are necessary to preserve the health, safety, and general welfare of the community and enable the City Council to make the findings set forth in the previous sections. The conditions are fair and reasonable for the accomplishment of these purposes.

SECTION 4. The City Clerk shall certify the adoption of this Resolution.

APPROVED AND ADOPTED this ___ day of ________ 2024.

________________________
MARIO TRUJILLO, Mayor

ATTEST:

____________________________
Attachment C
Agenda Page 24

Resolution No. 24 -8269

Page 10 ends

MARIA ALICIA DUARTE, CMC
City Clerk

APPROVED AS TO FORM:

_____________________________
JOHN M. FUNK
City Attorney

I HEREBY CERTIFY that the foregoing Ordinance No. 24-___ was introduced at a Regular Meeting of the City Council of the City of Downey held on the 24th day of September, 2024, and adopted at a Regular Meeting of the City Council of the City of Downey held on the ___ day of ___, 2024, by the following vote to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

___________________________________

MARIA ALICIA DUARTE, CMC
City Clerk

Attachment C
Agenda Page 25

Resolution No. 24 -8269

Page 11 ends

PLN-23-00168 (SITE PLAN REVIEW, CONDITIONAL USE PERMIT AND VARIANCE) EXHIBIT A – CONDITIONS

PLANNING

1) The approval of this Site Plan Review (PLN-23-00168) allows for the construction of a one -story, 18,718 square foot industrial tilt-up building to be built at a maximum height of 27 feet tall, located at 11521 Downey Avenue and 8268 Arnett Street (C-P Zone), and at 11531 Downey Avenue (O-S zone)_(APNs: 6255-013-032, 6255-013 -033, AND 6255- 013 -034) as reflected on plans date stamped August 21, 2024. The overall site shall also includes the retention of a 7,625 square foot gymnasium with a 975 square foot addition, and construction of a 2,271 square foot basement.

2) The approval of this Conditional Use Permit (PLN-23-00168) allows the operation of a Parks and Recreational Facility.

3) The approval of this Variance (PLN-23-00168) grants a deviation from Downey Municipal Code Section 9410.12(c) (Additions, Enlargement, and Remodels) allowing the retention of a 7,625 square foot gymnasium to remain in place, and retain its current legal non- conforming standards related to height and setbacks.

4) The Site Plan Review, Conditional Use Permit, and Variance (PLN-23-00168) shall become null and void unless permits for the proposed project are issued within twenty- four (24) months of this date, August 21, 2024. Time extensions may be granted by the Community Development Director if a written request is received by the Community Development Department within thirty (30) days prior to expiration.

5) This approval shall not be construed to mean any waiver of applicable and appropriate zoning regulations, or any Federal, State, County, and City laws and regulations. Unless otherwise expressly specified, all other requirements of the City of Downey Municipal Code shall apply.

6) The site shall remain in substantial conformance with this request and the approved set of plans.

7) The Owner/Applicant agrees, as a condition of approval of this resolution, to indemnify, defend and hold harmless, at Applicant's expense, City and City's agents, officers and employees from and against any claim, action or proceeding commenced within the time period provided in Government Code Section 66499.37 to attack, review, set aside, void or annul the approval of this resolution, to challenge the determination made by City under the California Environmental Quality Act or to challenge the reasonableness, legality or validity of any condition attached hereto. City shall promptly notify Applicant of any such claim, action or proceeding to which City receives notice, and City will cooperate fully with Applicant in the defense thereof. Applicant shall reimburse the City for any court costs and attorney's fees that the City may be required to pay as a result of any such claim, action or proceeding. City may, in its sole discretion, participate in the defense of any such claim, action or proceeding, but such participation shall not relieve Applicant of the obligations of this condition.

Attachment C
Agenda Page 26

Resolution No. 24 -8269

Page 12 ends

8) The Community Development Director is authorized to make minor modifications to the approved preliminary plans or any of the conditions if such modifications shall achieve substantially the same results as would strict compliance with said plans and conditions.

9) Prior to the submittal of plans into Building and Safety Plan Check or commencement of business, whichever occurs first, the applicant and the property owner shall sign an affidavit of Acceptance of Conditions, as provided by the City of Downey.

10) The applicant must shall comply with the art in public places requirements set forth in Downey Municipal Code 8950 et seq. This shall include payment of all required fees prior to the issuance of building permits. Should the applicant exercise their right to install public art on site, the public art application (including payment of all deposits) shall be submitted prior to the issuance of building permits.

11) The approved architectural style shall be Contemporary, as noted in the approved plans.

Changes to the facades and/or colors shall be subject to the review and approval of the Community Development Director.

12) All finished materials shall be to the satisfaction of the Community Development Director.

Final approval of all building materials (including but not limited to glass type, wall texture, canopies and awnings, and wood planking) shall be granted by the Community Development Director prior to the issuance of Building Permits.

13) All landscaping shall comply with the Downey Municipal Code, be composed of drought tolerant plants, and requires final approval from the Community Development Director prior to the issuance of Building Permits.

14) The permitted hours of operation:

Monday - Friday 6:00 am – 9:00 pm
Saturday 8:00 am – 4:00 pm
Sunday 12:00 pm – 5:00 pm

15) All exterior lights on the property shall be LED and shall be directed, positioned, and/or shielded such that they do not illuminate surrounding properties and the public right-of - way.

16) For security purposes, lighting shall be placed in such a way as to illuminate the area surrounding the trash enclosure, transformer, and all vehicle parking spaces. This lighting shall be un-switched and photo-sensor controlled.

17) All interior and exterior mechanical, plumbing, and unfinished electrical equipment and materials (including but not limited to wiring and pipes) shall be screened from the public’s view. All screening materials shall be approved by the Community Development Director.

18) Any bollards on the site visible from the public right-of -way must be decorative in nature and shall be approved by the Community Development Director.

19) The property shall be maintained in a safe, clean and sanitary condition at all times. The property owners shall be responsible for the daily maintenance and upkeep of the Attachment C
Agenda Page 27

Resolution No. 24 -8269

Page 13 ends

businesses and respective buildings, including but not limited to trash removal, graffiti removal, and maintenance of existing improvements to ensure that the properties are maintained in a neat and attractive manner.

20) All buildings and walls must be finished with graffiti resistant materials. Prior to the issuance of building permits, the applicant shall demonstrate to the satisfaction of the Community Development Director, that the finished materials will comply with this requirement.

21) Any graffiti applied to the site shall be removed within 48 hours.

22) The applicant must provide stamped color concrete or pavers across the driveways. The stamped color concrete or pavers shall be selected by the applicant and approved by the Community Development Director prior to building permit issuance.

23) Roof-mounted equipment shall be screened by the building parapet wall at all times.

Alternative supplemental screening design and materials must be approved by the Community Development Director.

24) All above grade back-flow preventers and check valves shall be painted green and screened from view from the public right-of-way with landscaping installed 3’ feet away from the apparatus as approved by the Community Development Director and Fire Chief.

25) Noise generated from the site shall comply with Municipal Code Section 4600 et. seq. In any case, noise shall not exceed 55 dBA from 7:00 a.m. to 10:00 p.m. and 45 dBA from 10:00 p.m. to 7:00 a.m., as measured at all property lines. Construction hours shall be limited to 7:00 a.m. to 7:00 p.m., Monday through Friday and 8:00 a.m. to 5:00 p.m., Saturdays. There shall be no construction on the site outside of these hours. No night- time construction shall be permitted as part of this project, unless a noise study is submitted to the Community Development Director indicating that noise levels produced by any construction will not exceed 45 dBA.

26) The applicant must incorporate a copy of this Exhibit A, Conditions of Approval, into the approved set of building plans.

CULTURAL RESOURCES

27) A monitor(s) shall be obtained and present during grading/excavation/trenching.

a) The archaeological monitor shall be present full-time during all soil-disturbing and grading/excavation/trenching activities that could result in impacts to archaeological resources.

28) Discovery Notification Process
a) In the event of an archaeological discovery, either historic or prehistoric, the archaeological monitor shall direct the contractor to temporarily divert all soil- disturbing activities, including but not limited to, digging, trenching, excavating, or grading activities in the area of discovery and in the area reasonably suspected to overlay adjacent resources, and immediately notify the California Native American Heritage Commission to identify appropriate procedure for preserving said discovery.

Attachment C
Agenda Page 28

Resolution No. 24 -8269

Page 14 ends

b) The monitor shall immediately notify the City of Downey of the discovery.

29) Determination of Significance
a) The monitor shall evaluate the significance of the resource. If human remains are involved, Condition #31 below, shall be followed.
i) The monitor shall immediately notify the City of Downey to discuss the significance determination and shall also submit a letter to the City of Downey indicating whether additional mitigation is required. ii) If the resource is significant, the monitor shall submit an Archaeological Data Recovery Program (ADRP) and obtain written approval from City of Downey to implement that program. Impacts to significant resources must be mitigated before ground-disturbing activities in the area of discovery will be allowed to resume.
iii) If the resource is not significant, the monitor shall submit a letter to the City of Downey indicating that artifacts will be collected, curated, and documented in the final monitoring report. The letter shall also indicate that that no further work is required.

30) Discovery of Human Remains
a) If human remains are discovered, work shall halt in that area until a determination can be made regarding the provenance of the human remains; and the following procedures as set forth in CEQA Section 15064.5(e), the California PRC (Section 5097.98), and the State Health and Safety Code (Section 7050.5) shall be undertaken:
i) Notification
(1) The archaeological monitor shall notify the City of Downey. (2) The monitor shall notify the Coroner’s Division of the Los Angeles County Sheriff’s Department after consultation with the City of Downey, either in person or via telephone.
ii) Isolate discovery site
(1) Work shall be directed away from the location of the discovery and any nearby area reasonably suspected to overlay adjacent human remains until a sheriff-coroner in consultation with the monitor concerning the provenance of the remains.
(2) The sheriff-coroner, in consultation with the monitor, will determine the need for a field examination to determine the provenance. (3) If a field examination is not warranted, the sheriff-coroner will determine, with input from the monitor, if the remains are or are most likely to be of Native American origin.
iii) If Human Remains ARE determined to be Native American (1) The medical examiner will notify the NAHC within 24 hours. By law, only the medical examiner can make this determination. (2) The NAHC will immediately identify the person or persons determined to be the most likely descendent (MLD) and provide contact information.
(3) The MLD will contact the monitor within 24 hours or sooner after the sheriff-coroner has completed coordination to begin the Attachment C
Agenda Page 29

Resolution No. 24 -8269

Page 15 ends

consultation process in accordance with CEQA Section
15064.5(e), the California PRC, and the State Health and Safety Code.
(4) The MLD will have 48 hours to make recommendations to the property owner or representative for the treatment or disposition with proper dignity of the human remains and associated grave goods.
(5) Disposition of Native American human remains will be determined between the MLD and the monitor, and, if:
(a) The NAHC is unable to identify the MLD; OR
(b) The MLD failed to make a recommendation within 48 hours after being notified by the NAHC; OR
(c) The landowner or authorized representative rejects the recommendation of the MLD and mediation in accordance
with PRC 5097.94 (k) by the NAHC fails to provide measures acceptable to the landowner; then
(d) Upon the discovery of multiple Native American human remains during a ground-disturbing land development activity, the landowner may agree that additional conferral with
descendants is necessary to consider culturally appropriate treatment of multiple Native American human remains.

Culturally appropriate treatment of such a discovery may be ascertained from review of the site utilizing cultural and archaeological standards. Where the parties are unable to agree upon the appropriate treatment measures, the human remains and grave goods buried with the Native American human remains shall be reinterred with appropriate dignity.

31) If Human Remains are NOT Native American
a) The monitor shall contact the sheriff-coroner and notify them of the historic-era context of the burial.
b) The sheriff-coroner will determine the appropriate course of action with the monitor and county staff (PRC 5097.98).
c) If the remains are of historic origin, they shall be appropriately removed and conveyed to Los Angeles County. The decision for internment of the human remains shall be made in consultation with County, the applicant/landowner, and any known descendant group.

32) Post Construction:
a) Preparation and Submittal of Draft Monitoring Report i) The monitor shall submit to City of Downey a draft monitoring report (even if negative) prepared in accordance with the agency guidelines, which describes the results, analysis, and conclusions of all phases of the archaeological monitoring program (with appropriate graphics). (1) For significant archaeological resources encountered during monitoring, the ADRP shall be included in the draft monitoring report.
(2) Recording sites with the State of California Department of Parks and Recreation shall be the responsibility of the monitor, including the recording (on the appropriate forms-DPR 523 A/B) any Attachment C
Agenda Page 30

Resolution No. 24 -8269

Page 16 ends

significant or potentially significant resources encountered during the archaeological monitoring program.
ii) The monitor shall submit a revised draft monitoring report to the City of Downey for approval, including any changes or clarifications requested by the City.

b) Handling of Artifacts
i) The monitor shall be responsible for ensuring that all cultural remains collected are cleaned and cataloged.
ii) The monitor shall be responsible for ensuring that all artifacts are analyzed to identify function and chronology as they relate to the history of the area; that faunal material is identified as to species; and that specialty studies are completed, as appropriate.
iii) The cost for curation is the responsibility of the property owner.

c) Final Monitoring Report(s)
i) The monitor shall submit the approved final monitoring report to the City of Downey and any interested parties.

POLICE

33) At the discretion of the Chief of Police, as a result of excessive calls for service, the business owner shall be required to submit a Security Plan and potentially retain security personnel. The Security Plan shall be reviewed and approved to the satisfaction of the Chief of Police.

BUILDING

34) All construction must comply with the most recent adopted City and State building codes:

a) 2022 California Building Code.
b) 2022 California Electrical Code.
c) 2022 California Mechanical Code.
d) 2022 California Plumbing Code.
e) 2022 California Fire Code.
f) 2022 California Green Code.

35) Special Inspections – As indicated by California Building Code Section 1704, the owner shall employ one or more special inspectors who shall provide special inspections when required by CBC section 1704. Please contact the Building Division at time of plan submittal to obtain application for special inspections.

36) The Title Sheet of the plans shall include:

a) Occupancy Group.
b) Occupant Load.
c) Description of use.
d) Type of Construction.
e) Height of Building.
f) Floor area of building(s) and/or occupancy group(s).

Attachment C
Agenda Page 31

Resolution No. 24 -8269

Page 17 ends

37) Dimensioned building setbacks and property lines, street centerlines and between buildings or other structures shall be designed on plot plan.

38) All property lines and easements must be shown on plot plan. A statement that such lines and easements are shown is required.

39) The project design will conform with energy conservation measures articulated in Title 24 of the California Code of Regulations and address measures to reduce energy consumption such as flow restrictors for toilets, low consumptions light fixtures, and insulation and shall use to the extent feasible draught landscaping.

40) A design professional will be required at time of construction drawings, to prepare plans for proposed improvements per the Business and Professions’ Code.

41) Public and private site improvements shall be designed in accordance with the Americans with Disabilities Act and Chapter 11 of the California Building Code. Site plan shall include a site accessibility plan identifying exterior routes of travel and detailing running slope, cross slope, width, pedestrian ramp, curb ramps, handrails, signage and truncated domes.

Path of travel shall be provided from the public right of way and accessible parking to building. The design professional shall ensure that the site accessibility plan is compliance with the latest Federal and State regulations.

FIRE

42) The following comments pertain to a fire review of a submitted design review plan(s). The comments contained herein shall not be construed as complete or encompassing all fire- life safe ty code requirements as set forth in local, State, and/or National codes.

43) Design and construction to meet all conditions for Assembly Group occupancy as it relates to the occupant load, exiting, exit sizing, exit illumination, emergency lighting, etc.

44) An occupancy load sign shall be posted and be clearly visible.

45) A fire flow study may be required to ensure adequate fire flow is available for the proposed construction based on building area and construction type.

46) Location shall be equipped with an automatic sprinkler system. A deferred automatic fire sprinkler plan shall be submitted. Automatic fire sprinkler system design, installation, and testing shall be per NFPA 13.

47) Location shall be equipped with a fire alarm and detection system. A deferred fire alarm and detection system plan submittal required. Automatic fire alarm and detection system design, installation, and testing shall be per NFPA 72.

48) Exit signs shall be properly illuminated and readily visible from any direction of egress travel.

49) Install approved key boxes (e.g. Knox Boxes) to occupancy.

50) Premises shall be appropriately addressed. An approved address identification shall be provided that is legible and placed in a position that is visible from the street/road. Sizing Attachment C
Agenda Page 32

Resolution No. 24 -8269

Page 18 ends

shall be approved and at a minimum meet requirement of CA Fire Code.

51) Establish of hazardous materials business plan (HMBP) for handling of chemicals related to swimming pool sanitization. This plan must be submitted to the California Environmental Reporting System (CERS) and include the name, quantity, and location of hazardous materials present on site.

PUBLIC WORKS

Streets

52) All public utilities shall be installed underground.

53) Proposed public improvements shall comply with the latest edition of Standard Plans and Specifications for Public Works Construction, City of Downey standards and the Americans with Disabilities Act (ADA).

54) Obtain permits from the Public Works Department for all improvements within the public right of way at least two weeks prior to commencing work. Contact Brian Aleman, Associate Civil Engineer, at (562) 904-7110 for information.

55) Remove and replace damaged, uneven or sub-standard curb, gutter, sidewalk, driveway, disabled ramps, and pavement to the satisfaction of the Public Works Department.

Contact the Public Works Inspector at (562) 904-7110 to identify the limits of the areas to be removed and replaced at least one week prior to commencing work.

56) Submit public improvement plan(s) for review and approval by Public Works Department.

57) All unused driveways shall be removed and constructed with full-height curb gutter, and sidewalk to match existing improvements.

58) Construct new driveways at least five (5) feet away from any above-ground obstructions in the public right-of -way to the top of the driveway “X.” Otherwise, the obstruction shall be relocated at the applicant’s expense. Ensure that each driveway provides proper pedestrian access across, in compliance with ADA standards. The final layout and site driveway design shall be subject to the review and approval by the Public Works Department.

59) Remove and replace the asphalt street pavement one lane-width (or other specified limits) from the edge of the gutter (gutter lip) along Arnett Street and Downey Avenue. Restore pavement markings as needed. Repair any visible utility-cut pavement failures up to the street centerline.

60) Remove all Underground Service Alert (USA) temporary pavement markings immediately following the completion of the work / Final permit inspection.

61) If necessary install any new stop signs, do not enter, right turn only, and all other miscellaneous signage as required by the Department of Public Works.

62) Paint property address numbers (4” height) on the curb face in front of the proposed development to the City’s satisfaction.

Attachment C
Agenda Page 33

Resolution No. 24 -8269

Page 19 ends

63) Drive approaches shall match driveway width as specified in City standard drawing No.

19. 64) Any utilities that are in conflict with the development shall be relocated at the owner/applicant's expense.

Water & Sewer

65) The owner/applicant shall furnish and install separate water service lines, meters, and boxes (min. 1-inch) for each building space. Connect new separate water service lines to existing 8-inch or 10 -inch water main located on Downey Avenue

66) The owner/applicant shall provide a fire sprinkler system(s) in accordance with Fire Department and Building and Safety standards. Should such fire sprinkler system(s) require the installation of dedicated fire service lateral(s), such lateral(s) shall be constructed in accordance with the latest Department of Public Works and Fire Department standards including backflow devices, fire department connections and other appurtenances as required. New fire service lateral(s) shall be connected to the existing 8-inch or 10 -inch water main located on Downey Avenue and shall be dedicated for fire service only.

67) The owner/applicant shall furnish and install irrigation, domestic, and fire water backflow devices in accordance with City of Downey standards and as required by State and LA County Department of Public Health. Backflow devices shall be located on private property, readily accessible for emergency and inspection purposes, and screened from view by providing sufficient landscaping.

68) Backflow devices shall be certified in the field by a licensed LA County Department of Public Health certified tester prior to placing into service and such certification provided to City.

69) Existing potable and fire water service lines and associated appurtenances must be removed and abandoned from the existing water main.

70) The owner/applicant shall furnish and install the public potable water improvements, including extension and/or replacement of existing mains and associated facilities, necessary to provide adequate fire flow and pressure to the site.

71) The owner/applicant shall furnish and install new water service line(s), meter(s), and box(es) (min. 1-inch) for landscape irrigation purposes. Connect new water service lines to existing 8-inch or 10-inch water main located on Downey Avenue.

72) The owner or tenant must establish accounts with the City Cashier prior to the City activating and the tenant using any fire, potable, or recycled water service and meter.

73) The owner/applicant shall provide separate water improvement plan sets for review and approval consisting of the following:

a) Potable Water Improvement Plans (all City-owned potable water and fire service lateral improvements)
Attachment C
Agenda Page 34

Resolution No. 24 -8269

Page 20 ends

Final City-approved potable water improvement plans shall be submitted on mylars and shall be signed and stamped by a State of California licensed civil engineer. Improvement plans for potable water improvements shall be both plan and profile.

74) Upon completion of water improvements, the owner/applicant shall submit red-lined construction plans to the City noting all changes to the plan and profile of all water improvements installed. Such changes shall be incorporated into a final record drawing mylar which shall be signed and stamped by the original engineer and/or architect of record and submitted to the City along with digital files (AutoCAD – latest edition).

75) The owner/applicant shall provide and record utility easement(s) for access to, and inspection and maintenance of, public water lines, meters, and appurtenances.

76) The owner/applicant shall furnish and install a new 6-inch Vitrified clay pipe (VCP) sewer lateral(s) (to the front property line) for each building in the lot and abandon any existing unused sewer laterals. The design and improvements of sewers shall be in accordance with the latest standards of the Department of Public Works. Septic systems shall not be allowed.

77) Submit a copy of the sewer plans to the City and the Sanitation Districts of Los Angeles County for review and approval. Approval must be assured prior to the start of construction. Contact Los Angeles County Sanitation District for their requirement.

78) The owner/applicant shall consult the Department of Public Works to determine the sewer location and design requirements.

79) The proposed development shall be served by adequately sized water supply facilities, which shall include fire hydrants of the size, type, and location approved by the Fire Chief.

80) The water mains shall be of sufficient size to accommodate the total domestic and fire flow required for the development. The domestic/fire water flows required are to be checked and approved by the Department of Public Works or the water provider for size and velocity. Fire flows required are to be determined by the Fire Chief.

81) Any deviation from the city standards in constructing the water and sewer lines shall be approved by the Los Angeles County Health Department.

82) The owner/applicant shall retrofit any existing fire hydrant(s) within the property frontage in accordance to the latest Fire Department and Department of Public Works standards including but not limited to furnishing and installation of a new riser, fire hydrant head, and associated fittings. If substandard Materials/fittings (ACP, Galvanized, Caulked Joints, etc.) are encountered, the owner/developer/contractor shall install a new fire hydrant assembly (tee, gate valve, lateral, and head).

Grading

83) Submit an engineered grading plan and/or hydraulic calculations and site drainage plan for the site (prepared and sealed by a registered civil engineer in the State of California) Attachment C
Agenda Page 35

Resolution No. 24 -8269

Page 21 ends

accompanied by a soil and geology report for approval by the Engineering Division and Building and Safety Division. Lot(s) shall not have less than one (1%) percent gradient on any asphalt or non-paved surface, or less than one quarter (1/4%) percent gradient on any concrete surface. Provide the following information on plans: topographic site information, including all building pad and other elevations, dimensions/location of existing/proposed public improvements adjacent to project (i.e. street, sidewalk, parkway and driveway widths, catch basins, pedestrian ramps); the width and location of all existing and proposed easements, the dimensions and location of proposed dedications; (for alley dedications, show elevations of the four corners of the dedication and centerline of alley, existing and proposed underground utility connections); the location, depth and dimensions of potable water, reclaimed water and sanitary sewer lines; chemical and hazardous material storage, if any, including containment provisions; and the type of existing use, including the gross square footage of the building and its disposition; construction details of drainage devices and details of Low Impact Development (LID) plan.

84) The drainage plan must provide for each lot having an independent drainage system to the public street, to a public drainage facility, or by means of an approved drainage easement.

85) Historical or existing storm water runoff from adjacent lots must be received and directed by gravity to the street, a public drainage facility or an approved drainage easement.

NPDES

86) The owner/applicant shall comply with the National Pollutant Discharge Elimination System (NPDES); Ordinance 1142 of the Downey Municipal Code (DMC); and the Low Impact Development (LID) Plan. Furthermore, the applicant shall be required to Certify and append Public Works standard “Attachment A” to all construction and grading plans as required by the LACoDPW Stormwater Quality Management Plan (SQMP).

87) Owner/applicant shall comply with the Low Impact Development requirements. The owner/applicant shall provide a separate Low Impact Development plan and report for review and approval from the City of Downey Engineering Division

88) The owner/applicant shall secure a WDID number along with his SWPPP.

89) If any hazardous material is encountered on the site that has the potential to reach the ground water supply, the owner/applicant shall secure a permit for the State Regional Water Quality Control Board.

90) If any hazardous material is encountered on the site, the owner/applicant shall secure an ID number from the EPA.

91) The owner/applicant shall deploy Best Management Practices during and after construction.

Recycling

92) The facility must provide for recycling facilities, i.e., storage and handling areas for recycling facilities. The facility design must provide for refuse/recycle enclosure with roof Attachment C
Agenda Page 36

Resolution No. 24 -8269

Page 22 ends

cover (location, size). Trash enclosure shall include a roof cover and enough room to accommodate for organic waste recycling bin in accordance with new Senate Bill (SB) 1383 - California’s Short-Lived Climate Pollutant Reduction Strategy.

93) Complete a construction & demolition (C&D) waste management plan per Article V, Chapter 8 of the Downey Municipal Code.

General

94) Construct onsite pavement, consisting of a minimum section of 4” thick aggregate base, and a minimum 2-1/2” thick asphalt concrete pavement. Construct Pavement on-site parking and circulation areas as required by a pavement engineering or geotechnical report prepared by a Registered Civil Engineer, subject to the review and approval of the Public Works and Community Development Departments.

95) Remove all construction-related Underground Service Alert (USA) temporary pavement markings created as part of this project within the public right-of -way in a timely manner.

96) The owner/applicant must comply with all applicable Federal, State and local rules and regulations, American Disabilities Act (ADA), including compliance with South Coast Air Quality Management District (SCAQMD) regulations.

[End of Conditions]

Attachment C
Agenda Page 37

Resolution No. 24 -8269

Page 23 ends

Attachment C
Agenda Page 38

RESOLUTION NO. 24-8270

A RE SOLUTION OF THE CITY COUNCIL OF THE CITY OF DOWNEY

APPROVING A LOT MERGER FOR THE CONSOLIDATION OF THREE
SEPARATE PARCELS (APNs: 6255-013-032, 6255 -013 -033, AND 6255-013- 034), LOCATED AT 11521 DOWNEY AVENUE, 11531 DOWNEY AVENUE, AND 8268 ARNETT STREET
WHEREAS, on May 21, 2024, the applicant, Rodrigo Abello (a representative of YMCA of Los Angeles), formally submitted a request for a Zone Change, Site Plan Review, Conditional Use Permit, Variance, and Lot Merger, to construct a new 18,718 square foot YMCA parks and recreational facility at 11521 Downey Avenue, 11531 Downey Avenue, and 8268 Arnett Street (“Project”); and,
WHEREAS, on June 21, 2024, the applicant was issued a letter deeming the application incomplete; and
WHEREAS, on July 23, 2024, upon review of all required materials submitted, the applicant was issued a letter deeming the application complete.

WHEREAS, on August 8, 2024, notices of a Planning Commission public hearing for a Zone Change, Site Plan Review, Conditional Use Permit, Variance, and Lot Merger were sent to all tenants and property owners within 500 feet of the subject site, and the public hearing notice was published in Downey Patriot; and
WHEREAS, the Planning Commission held a duly noticed public hearing on August 21, 2024, and after fully considering all oral and written testimony, facts, and opinions, adopted Resolution No. 24-4037 recommending approval of a Lot Merger by the City Council for the Project, as well as Resolution 24-4035 recommending approval of a Zone Change and Resolution 24-4036 recommending approval of a Site Plan Review, Conditional Use Permit, and Variance; and
WHEREAS, the City Council held a duly noticed public hearing on September 24, 2024, to fully consider all oral and written testimony and facts and opinions regarding the Zone Change, Site Plan Review, Conditional Use Permit, Variance, and Lot Merger.

NOW, THEREFO RE, THE CITY COUNCIL OF THE CITY OF DOWNEY, CALIFORNIA, DOES HERE BY RESOLVE AS FOLLOWS:

SE CTION 1. The City Council of the City of Downey hereby finds, determines, and declares as follows:

A.The merged parcel conforms with the general plan, zoning ordinance and applicable specific plan. The merged parcels are located within the City’s General Plan land use designation of Office (O) and are to be appropriately zoned Commercial Office (C-P), which identifies the standard size of lots within the zone as a minimum of 6,000 square foot. The proposed merged parcel is a total of 2.16 acres, or 94,089.60 square feet, which is in compliance with the standards required in the Downey Municipal Code.

Attachment D
Agenda Page 39

Resolution No. 24 -8270

Page 2 ends

B. Development of the merged parcel creates no public health, safety or welfare hazards. The lot merger will assist in facilitating the redevelopment of the site with a small newer facility of the same use and function. All potential impacts are expected to either be reduced or equal compared to existing impacts present while the current vacant YMCA recreation facility was in operation. Lastly as evidence to the support a Class 32 CEQA exemption, the overall redevelopment of the site underwent technical studies related to Noise, Air Quality and Greenhouse Gas Emissions, Cultural Resources, and Traffic. The studies find that no impacts will be generated as a result of the redevelopment of the site. Therefore, it is further found that the merged parcels and final development will not create hazards to public health, safety, or welfare.

C. The merged parcel has adequate access and is served by all necessary utilities.

The proposed parcel will have access from two separate street frontages along Downey Avenue and Arnett Street. Maneuvering onto and out of the site is achieved through two (2) separate 26’ (foot) driveways allowing adequate access to emergency vehicles. Utilities including, but not limited to, cable, phone, internet, and electricity are currently existing on site and accessed from utility poles found along both street frontages.

D. The merged parcel is comprised of legally created standard parcels, owned in common by the same person(s). The parcels are recorded with the County of Los Angeles and identified in Parcel Map No. 6255, Page 13, as Parcels 32, 33, and 34, and are all owned by YMCA of Los Angeles.

E. The merged parcel does not require right-of-way or utility easement dedications, as none are proposed for this project and are not currently located on site to provide the current utilities to the existing site.

F. The merged parcel does not require parking or access agreements. All parking is contained on site and in compliance with the standards outlined in the Downey Municipal Code.

SECTION 2. The City Council further finds, determines and declares that the proposed project was reviewed for compliance with the California Environmental Quality Act (CEQA), and is categorially exempt from CEQA, pursuant to CEQA Guidelines Section 15332 (Class 32 – In- fill Development Projects). Class 32 exemptions consist of projects characterized as in-fill development meeting the following conditions: the project is consistent with the applicable general plan and zoning designations; the proposed development occurs within city limits on a site of no more than 5 acres substantially surrounded by urban uses; the project site has no value as habitat for endangered, rare, or threatened species; approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality; and the site can be adequately served by all required utilities and public services.

SECTION 3. Based upon the findings set forth in Sections 1 and 2 of this Resolution, the City Council hereby approves a Lot Merger for the Project, subject to conditions of approval attached hereto as Exhibit ‘A’, which are necessary to preserve the health, safety and general welfare of the community and enable the City Council to make the findings set forth in the previous sections. The conditions are fair and reasonable for the accomplishment of these purposes.

SECTION 4. The City Clerk shall certify the adoption of this Resolution.

Attachment D
Agenda Page 40

Resolution No. 24 -8270

Page 3 ends

APPROVED AND ADOPTED this ___ day of ________ 2024.

________________________
MARIO TRUJILLO, Mayor

ATTEST:

____________________________

MARIA ALICIA DUARTE, CMC
City Clerk

APPROVED AS TO FORM:

_____________________________
JOHN M. FUNK
City Attorney

I HEREBY CERTIFY that the foregoing Resolution No. 24 -___ was introduced at a Regular Meeting of the City Council of the City of Downey held on the 24th day of September, 2024, and adopted at a Regular Meeting of the City Council of the City of Downey held on the ___ day of ___, 2024, by the following vote to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

___________________________________

MARIA ALICIA DUARTE, CMC
City Clerk
Attachment D
Agenda Page 41

Resolution No. 24 -8270

Page 4 ends

PLN-24-00068
(LOT MERGER)

EXHIBIT A - CONDITIONS

LOT MERGER

1) The Lot Merger shall be recorded with Los Angeles County Recorder’s office within one (1) year of this date, August 21, 2025. Time extensions, not to exceed one (1) year, may be granted and approved by the Community Development Director, if a written request is received by the within thirty (30) days prior to expiration.

2) The subdivision map shall be recorded in accordance with the approved Lot Merger, date stamped August 21, 2025, and to the satisfaction of the Public Works Director.

3) Prior to recordation of the Lot Merger, a Notice of Merger shall be recorded with the Los Angeles County Recorder’s Office within thirty (30) days of August 21, 2025. Such notice shall be notarized by the property owner. Time extensions may be granted and approved by the Community Development Director.

4) Prior to recordation of the Lot Merger, current ownership evidence such as updated preliminary title reports and deeds shall be submitted for review.

5) All conditions of approval herein, as applicable, shall be satisfied prior to recordation of a final map or as otherwise specified herein

6) In the event the Lot Merger is not executed, at the expense of the applicant, the Community Development Director shall cause to be recorded a release of the Notice of Merger.

Attachment D
Agenda Page 42

YMCA OF METROPOLITAN LOS ANGELES
4301 W 3rd Street, Los Angeles, CA 90020-3809
P 213 380 6448 W www.ymcaLA.org
Los Angeles
June 7, 2024
City of Downey
Mr. Alfonso S. Hernández
Principal Planner
Community Development Department
The Kolar Family YMCA will provide essential programs for Downey and surrounding community’s youth and families that address key areas of need in the community including: Sports and Teen Leadership programs, Academic Enrichment and Support, Water Safety and Drowning Prevention for children, teens, and adults, Healthy Lifestyle programs for mind, body, and spirit for all ages, Before and After School childcare (off site on school campuses), and critical support and access for our senior, veteran, and special needs populations.

Also, a child activity center will be staffed during operating hours that will provide care for parents while on site participating in programs and activities. Those hours will be M-F, 6 a.m. to 9 p.m., Sat. 8 a.m. – 4 p.m. and Sunday 12p.m. – 5 p.m. The Y will employ 100 individuals with 4-10 on site at any given time. Parking for employees will be in the new small lot and/or at the Arnett street lot. Annual reoccurring special events will be the Annual Campaign Kick Off and Victory dinner along with Annual Volunteer Appreciation event, all of which may include approximately 100 individuals. Designated delivery times will be coordinated with individual vendors to take place early morning, mid- morning and mid - afternoon.

Regards,
Rodrigo Abello
Capital Project Manager

YMCA OF METROPOLITAN LOS ANGELES
4301 W 3rd Street
Los Angeles, CA 90020
(m) 213.653.0207
(e)[email protected] (w) www.ymcaLA.org
Attachment E
Agenda Page 43

IOWA STREETDAVIS STREETTEXAS STREETARNETT STREETDOWNEY AVENUE ∆
∆
∆
∆
∆
∆

SITE PLAN

PROPOSED
21051 WARNER CENTER LANE
SUITE 220

WOODLAND HILLS,
CA 91367
WWW.TNIDESIGN.COM
PH (818) 343-5393
PROJECT DESCRIPTION:

YMCA
DOWNEY
11531 DOWNEY
AVE.

DOWNEY, CA
90241
SHEET:

YYMMDD -
DATE:

DESCRIPTIONDATE
SHEET CONTENTS:

NEW GYMNASIUM CONSTRUCTION &

ADDITION TO EXISTING FACILITIES
PROJECT ADDRESS:

REV.
- - - - - - - - - - - - -

YYMMDD -

YYMMDD -

YYMMDD -

YYMMDD -
TNI-PROJECT #
2019-9071
ARCHITECT:
2023 - OCT - 30

STRUCTURE TO BE DEMOLISHED

DEMOLITION PLAN
LEGEND

STRUCTURE TO REMAIN
Attachment F
Agenda Page 44

EVCSEVCS7S8S9S10S11S12S13S14S15S17S18S19S20S21S22S23S24S25S26S27S28S29S30S31S32S33S34S35S36S37S41S40S39S42S43S58S57S56S55S54S53S52S51S50S49S48S47S46S61S62S63S64S65S66S67S68S69S70S71S72S60S7C6C5C4C2C3C1C4HC3HC2HC1EVCSEVCS5EVCSEVCS10S9S8S7S6S5S4S3S2S1S12S13S14S15S16S17S73EVCS44EVCS19HC11S6S16S38S45S59S18S46' REAR YARD SETBACK LINE10' SIDE YARD SETBACK LINEPROPERTY LINE = 107.58'N 58°53'40" WPROPERTY LINE = 167.35'N 58'57'12" WPROPERTY LINE = 319.59'N 30°17'00" E46' SIDE YARD SETBACK LINEPROPERTY LINE = 256.34'N 58°56'15" WPROPERTY LINE = 71.67'N 31°08'20" E(N) GYMNASIUM1-STORY18,718 ± SFNEW CONSTRUCTIONARNETT STREETDOWNEY AVENUEZONINGR-1 ZONINGR-1 ZONINGR-1 ZONINGR-1 ZONINGR-1 ZONINGR-1 ZONINGR-1 ZONINGR-1 ZONINGR-3 ZONING(E) GYMNASIUM1-STORY6,620± SF26'± HIGHTO REMODELC-P ZONING(N) LOBBY,RESTROOMS,975 SF(E) STORAGE495± SF(E) ELECTRICAL510± SF(E) YMCAPARKINGLOT42 TOTALSPACES46' SIDE YARDSETBACK LINE46' SIDE YARD SETBACK10'-0"R28'-0"REQ10' FRONT YARD SETBACK LINEPROPERTY LINE(N) CROSSINGSIGNAL(E) 5'-6" BLOCK WALL(E) TRANSFORMERPAD(N) 5'-6" BLOCK WALL(N) CANOPY(N) VEHICLEBARRIER(N) 7' x 10.5'HATCH TOBASEMENTFIRE ACCESS 150'-0" TRAVELFIRE ACCESS 150'-0" TRAVEL(N)PICKLEBALLCOURTDELIVERYENTRANCEMAINENTRANCE(N) 10' HIGHFENCINGAROUND COURTS(E) CURB(N) GATE(N) 36" WIDEGATE(N) SLIDINGGATE &FENCING(N) TREE, TYP(N) CHARGINGSTATION, TYP(N) SLIDINGGATE(N) 6' HIGH FENCING(N) BICYCLEPARKING( 2 SHORT TERM2 LONG TERM )(N) UTILITY BASEMENT2271 SF(N) LIGHTPOST, TYP(N) GATE(N) EV-EQUIP.UNDERGROUNDVAULT(N) LIGHTPOST, TYP14 STANDARD @ 8'-9" EACH6'-8"24'-5"20'-0"12'-4"7'-6"25'-0"20'-0"10'-6"±22 STANDARD @ 8'-9" EACH31'-10" ±32'-0" ±20'-0"20'-0"25'-0"ZONING MIN.20'-0"25'-0"ZONING MIN.4'-6"70'-8" ±26'-6" ±10'-0"9'-5"20'-0"26'-0"20'-0"10'-4"±26'-0"FIRE MIN.20'-0"5'-0"30'-0"200'-11" OVERALL10'-11" ±10 STANDARD @ 9'-4" EACH54'-8"14'-10"9'-1"26'-0"FIRE MIN.5'-0"93'-7" ±13'-4" ±5'-0"5'-0"26'-0"FIRE MIN.13'-5"107'-6" OVERALL25'-0"VISIBILITY CLEARANCE25'-0"VISIBILITY CLEARANCE(9) COMPACT @ 8'-0" EACH10'-11"36'-9"37'-11" ±6'-0"3'-6"3'-6"11'-6"±49'-7"±13'-11" ±8 STANDARD @ 9'-4" EACH9'-4"9'-4"18'-0"8'-0"18'-11" ±(6) STANDARD @ 9'-9" EACH(10) STANDARD @ 8'-9" EACH6'-1"TRASHLOADING40'-0"ROOF LINE ABOVE12'-11"15'-6"EXTERIORCOURTSECUREDLAWN OVERSURGETANK5'-0"4'-5"EGRESSSTAIRWELLFROMBASEMENT5'-0"(E) APRON TO REMOVE(E) APRON TO REMOVE(N) APRON10'-11" ±(N) L.I.D.UNDERGROUNDSTORAGESEE CIVIL DWG(N) L.I.D.UNDERGROUNDSTORAGESEE CIVIL DWGNEW CONSTRUCTIONEXISTING BUILDING AREATO BE REHABILITATED LEGENDNEW LANDSCAPING016'32'8'SCALE: 1"=16'-0"TRUE NORTHPROJECT NORTHA1.01SITE PLANPROPOSED"EVC" ELECTRIC VEHICLE CAPABLE. INCLUSIVE OF EVCSSPACES. NON-EVCS REQUIRES ONLY SUPPLYRACEWAY & SUPPORTING INFRASTRUCTURE, NOCHARGING STATION"EVCS" ELECTRIC VEHICLE CHARGING STATION"DCFC" DIRECT CURRENT FAST CHARGING1. EVC SPACES REQUIRED FOR NEW CONSTRUCTION ONLY.2. FOR EACH DCFC STATION, MAY OMIT 5 EVC SPACES(CGBC 5.160.5.3.2)3. AN EVC SPACE SHALL COUNT AS AT LEAST ONESTANDARD PARKING SPACE TOWARD MINIMUM PARKINGREQUIRED (CVC 22511.2.A)4. AN ACCESSIBLE EVCS SPACE SHALL COUNT AS AT LEASTTWO STANDARD PARKING SPACES TOWARD MINIMUMPARKING REQUIRED (CVC 22511.2.B)5. LANDSCAPE DIAMONDS PER 10 SPACES PROVIDED IN LIEUOF LANDSCAPE ISLANDS PER PLANNERVEHICLE PARKINGTOTALACCESSIBLE(INCL. EVCS. ACC.)EVCINCL. EVCSEVCS LOADING1 SPACEPER 300 SF4(INCL. 1 VAN)1731 (12' x 40')914 SPACESPER 76 - 100 TOTAL1 VAN PER 6 ACC.17 SPACESPER 76 - 100 TOTAL3PER PLANNERCBC 11B-208.2 CGBC 5.106.5.3.1 CBC 11B-228.3.2.14(INCL. 1 VAN)17 399 TOTAL ( 92 STANDARD ) ( 7 COMPACT )LANDSCAPINGPROVIDEDPARKINGLOT TOTAL10 PERCENT OF PARKING AREA,EXCLUSIVE OF AREA WITHINFRONT & SIDE SETBACKSDMC 9520.04.E.1LOT ABUTTING:RESIDENTIAL 10'-0"NON-RESID. 5'-0"DMC 9520.04.E.3.iON-SITE990EXISTING0EXISTING0EXISTINGN/A42 EXISTING(8'-8" x 19'-9")OFF-SITE424565 SFPARKING PERIMETERNOTES:4931 SFSEE PLANBUILDING AREA CONSTRAINTSFLOOR AREA RATIOSETBACKSFRONT 20 FEETREAR 46 FEET (ABUTTING RESIDENTIAL)20 FEET (ABUTTING NON-RESIDENTIAL)SIDE 46 FEET (ABUTTING RESIDENTIAL)NO REQ. (ABUTTING NON-RESIDENTIAL)10 FEET (STREET)LOT COVERAGE50% = 47,094 SFBICYCLE PARKINGPER CGBC 5.106.41 (12' x 40')21051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 30LOT AREA = 94,185.02 SF(PER SURVEY)SHORT TERM:2% OF (N) VEHICLESPACES(MIN. SINGLE TWO-BIKERACK)LONG TERM:2% OF (N) VEHICLESPACES(MIN. ONE FACILITY)SHORT TERM:SINGLE TWO-BIKE RACKLONG TERM:ONE TWO-BIKE LOCKERNO REQUIREMENTREQUIRED27,318 ± SFPROVIDEDZONINGC-P141TOTAL91TOTALREQUIREDPROVIDEDREQUIREDPROVIDEDREQUIREDAttachment FAgenda Page 45

Attachment FAgenda Page 46

LEGENDBUILDING ELEMENT ABOVEWALL GLAZING:CURTAIN WALL, OR STOREFRONT GLAZING (SEE PLAN)8" CONCRETE MASONRY WALLw/ INTERIOR FURRING WALLMETAL STUD FRAMED WALLNON-LOAD-BEARING WALL12"W x 18"D LOCKER STACK( A.D.A. ACCESSIBLE )12"W x 18"D LOCKER STACKBENCH, FIXED( A.D.A. ACCESSIBLE )BENCH, NON-FIXEDSCALE, NON-FIXEDSWIMSUIT SPINNERWALL MOUNTEDTRASH CAN, NON-FIXEDACCESSIBLE MANEUVERINGSPACE60" x 60"30" x 48"60" ØUSER LINE-OF-SIGHTDIAPER CHANGING STATIONWALL-MOUNTEDWATER CLOSETFLOOR-MOUNTEDURINALFLOOR-MOUNTED, FLUSHLESSLAVATORYCOUNTER BOTTOM-MOUNTDRINKING FOUNTAINFENCELANDSCAPINGSEE LANDSCAPE DRAWINGS3C1C4HC3HC2HC1EVCSEVCS5EVCSEVCS3S2S1S19HC18STRASHTRASHTRASH58575655545352515049484746454443424140393837363534333231302921222324252627281819201314151617585756555453525150 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 2921222324252627281819206 7 8 9 10 11 124513 14 15 16 173126789101112453125634HC6059585756555453606060575655542712DN82'-0"8'-0"NATATORIUM100'-4" x 53'-4"MEN'S LOCKERSWOMEN'S LOCKERSUNIVERSALLOCKERS12'-2" x 18'-0"VIEWING27'-5" x 15'-10"CHILD ACTIVITIES21'-8" x 12'-4"40' x 12"LOADINGMECHSHAFTJANITOR7'-1" x 6'-2"DOWNEY AVENUEARNETT STREETPROPERTY LINEPROPERTY LINEROOF ABOVE(N) CANOPYABOVEEXISTINGBASKETBALL GYMNEWLOBBY & RESTROOMSMAINENTRANCEDELIVERYENTRANCEHATCH TO UTILITY BASEMENT10'-6" x 7'-0"SEE SHEET A2.11RECEPTION15'-10" x 9'-3"KITCHEN7'-8" x7'-10"STAFFOFFICE10'-6" x15'-0"OFFICE8' x 14'FRONT SETBACKSIDE SETBACKTRAFFIC VISIBILITYCLEARANCE(58 LOCKER STACKS)25'-6" x 15'-0"(58 LOCKER STACKS)PEDESTRIAN GATEVEHICLE SLIDE GATEGATE MOTORSIDE YARDSETBACK LINEMECH SHAFTFUTUREWARMWATERTREATMENTPOOLSTAFFPOOLSTORAGE10'-0"x 53'-4"10'-4"10'-0"80'-8"6'-8"48'-6"27'-0"6'-8"15'-0"15'-2"11'-2"5'-2"40'-0"8'-0"15'-10"12'-4"14'-6"4'-0"4'-0"136'-0"58'-4"6'-8"3'-6"201'-0" OVERALL58'-0"29'-0"15'-10"106'-4" OVERALL3'-6"66'-2"93'-2"16'-0"25'-0"10'-0"REQ SETBACK10'-0"REQ SETBACKRELAXATION ROOM7'-4" x 13'-9"POOL OFFICE7'-10" x 5'-10"VEHICULAR GUARDS1234GFEDCBA1234SIDE YARDSETBACK LINEEXTERIOR TRASH AREA11'-8" x 15'-8"STORAGE7'-1" x15'-4"3A3013A3011A302PICKLEBALLCOURTBASEMENT STAIRS10'-0"1A3013A301MULTI-PURPOSE56'-2" x 27'-0"FITNESS80'-8" x 48'-6"ROOFACCESSOFFICE8' x 15'StreathingSCALE:FLOOR PLAN - OVERVIEW3/32"=1'-0"1PROJECT NORTHA2.01FLOOR PLANPROPOSED016'8'SCALE: 3/32"=1'-0"21051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 06Attachment FAgenda Page 47

WALL GLAZING:CURTAIN WALL, OR STOREFRONT GLAZING (SEE PLAN)8" CONCRETE MASONRY WALLw/ INTERIOR INSULATED FURRING WALL6" MTL STUD FRAMED WALLw/ CAVITY ACOUSTIC INSULATIONLEGENDBUILDING ELEMENT ABOVE3-5/8" MTL STUD FRAMED WALLw/ CAVITY ACOUSTIC INSULATIONEXISTING MASONRY WALL12"W x 18"D LOCKER STACK( A.D.A. ACCESSIBLE )12"W x 18"D LOCKER STACKBENCH, FIXED( A.D.A. ACCESSIBLE )BENCH, NON-FIXEDSCALE, NON-FIXEDSWIMSUIT SPINNERWALL MOUNTEDTRASH CAN, NON-FIXEDACCESSIBLE MANEUVERINGSPACE60" x 60"30" x 48"60" ØUSER LINE-OF-SIGHTDIAPER CHANGING STATIONWALL-MOUNTEDWATER CLOSETFLOOR-MOUNTEDURINALFLOOR-MOUNTED, FLUSHLESSLAVATORYCOUNTER BOTTOM-MOUNTDRINKING FOUNTAINFENCELANDSCAPINGSEE LANDSCAPE DRAWINGSTRASHTRASHTRASHDN7C6C5C4C2C3C1CSS1S12S13S14S15S16S17S19HC11S18S(E) 26'-6"±35'-7"(E) 37'-11" ±(E) 16'-2" ±(E) 93'-7" ±5'-0"(E) 70'-8"±(N) CANOPYABOVE(N) LOBBY(E) BASKETBALL GYM(N)WOMENS'WC(N)MENS'WC(E) STORAGE(E) ELECTRICALMAINENTRANCEDELIVERYENTRANCE(N) HATCH &LIFT TO UTILITYBASEMENT &STORAGE3'-0"4'-0"SEE SHEET A2.0126'-0"REQ. FIRE ACESS(N) DRIVEAISLE(N) DRIVEAISLE(N) PICKLEBALLCOURTS(E)TRANSFORMER(N) 5'-6"BLOCK WALLDRINKINGFOUNTAINS,TYP.SIDE YARDSETBACK LINESIDE YARDSETBACK LINEVEHICULARGUARDRAIL(N) TRASH ENCLOSURE5'-4"13'-4"5'-3"26'-0"REQ. FIRE ACCESS2A302ROOFACCESS(E) STAIRSCALE:FLOOR PLAN - OVERVIEW3/32"=1'-0"1A2.11BASKETBALL GYMFLOOR PLANPROPOSEDPROJECT NORTH016'8'SCALE: 3/32"=1'-0"21051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 06Attachment FAgenda Page 48

GF1EDCBA234GFEDCBA1234COLUMNTYPFUTURE WARMWATERTREATMENTPOOL ABOVELAP POOL ABOVEBUILDING WALLABOVE66'-8"EGRESS STAIR35'-3"ACCESS HATCH10'-6"UP"UUEAL66ATTRR66SHAFTSHAFT7'-0"ELECTRICALRMCHEMICALSTORAGECHEMICALSTORAGEMECHANICALRMSCALE:BASEMENT FLOOR PLAN3/32"=1'-0"1A2.02BASEMENT PLANPROPOSED21051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 06PROJECT NORTH016'8'SCALE: 3/32"=1'-0"Attachment FAgenda Page 49

EF4T5T4T2T3T5TEFEFEFEFEF5T5T5T5TH= 48"H= 48"H= 48"H= 48"H= 32"H= 32"H= 66"H= 48"H= 66"H= 66"H= 66"H= 66"H= 66"H= 60"H= 60"H= 60"H= 60"WHH= 66"WHH= 66"EFH= 32"EFH= 32"3TH= 60"EFH= 32"5TH= 66"CONDEFDHH= 114"H= 62"SLSLSLSLSLSLSLSLSLSLWALL BELOWROOF SHEATHING:(TYPICAL THROUGHOUT)SINGLE PLY MEMBRANEOVER COVER BOARD& RIGID INSULATIONOVER CONC. STR. DECKSEE STR. DWG.PARAPETHEIGHT VARIES(42" MIN.)ROOF ACCESSHATCHPOOL EXHAUST FANSEE MECH. DWG.ROOF DRAIN &OVERFLOW, TYPICAL24'-0" ± AFF20'-0" ± AFF27'-0" ± AFG20'-0" ± AFF6'-0" ± HIGHPRE-FAB MTLMECH. EQ. SCREEN(N) METALCANOPY5'-0"1234GFEDCBA1234GFEDCBASOLARPANELS, TYP.HVAC EQ.SEE MECH. DWG.BRACE FOR SCREENTYPICAL3/8 : 12 SLOPE3/8 : 12 SLOPESKYLIGHTUTILITY SHAFTSKYLIGHTUTILITYSHAFTSCUPPER DRAIN,TYP.CRICKET SLOPEBUILT UP BYTAPERED RIGIDINSULATION, TYP.DOWNSPOUT WITHIN FURRING WALLDISCHARGING TO UNDERGROUNDPIPE TO L.I.D. MEASURE (T.B.D.)H.V.A.C. DUCTSEE MECH. DWG.3/8 : 12 SLOPE3/8 : 12 SLOPE3/8 : 12 SLOPE3/8 : 12 SLOPE3/4 : 123/4 : 123/4 : 12 3/4 : 123/4 : 12 3/4 : 123/4 : 12 3/8 : 12 SLOPE3/4 : 12 3/4 : 12LADDER ACCESSTO UPPER ROOFLADDER ACCESSTO UPPER ROOFWALL BELOWSEE SHEET A2.046'-0" ± HIGHSCREENSCALE:ROOF PLAN3/32"=1'-0"1A2.03ROOF PLANPROPOSED21051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 06PROJECT NORTH016'8'SCALE: 3/32"=1'-0"Attachment FAgenda Page 50

12.5 T5 T2T+60"EFEF+60"+80"+60"(N) SINGLE-PLY MEMBRANEo/ (N) RIGID INSULATIONo/ (E) STRUCTURAL DECKROOF SHEATHING:(TYPICAL THROUGHOUT)SINGLE PLY MEMBRANEOVER COVER BOARD& RIGID INSULATIONOVER STRUCTURAL DECK(T.B.D. BY ENGINEER)3/8 : 121.5 : 121.5 : 12 6' HT. METALMECHANICALSCREENLADDER ACCESSTO GYM ROOF3/4 : 12SEE SHEET A2.03(N) MTL CANOPYSCALE:ROOF PLAN3/32"=1'-0"1A2.12GYM ROOF PLANPROPOSED21051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 06PROJECT NORTH016'8'SCALE: 3/32"=1'-0"Attachment FAgenda Page 51

P L12'-6"FLOOR24'-0"27'-0"PARAPET12'-6"FLOOR7'-6"SOFFITSTOREFRONTGLAZINGFAUX WOODHIGH PRESSURE LAMINATE PANELS"TRESPA : METEON (NW10 ENGLISH CHERRY"BLACK ALUMINUMFACIAH.V.A.C. EQUIPMENTCURTAIN WALLGLAZING SYSTEMSMOOTH CONCRETECOLUMNGFEDCBARUSTICATEDCONCRETE BLOCKFAUX WOODHIGH PRESSURE LAMINATE PANELS"TRESPA : METEON (NW10 ENGLISH CHERRY"MECHANICAL SCREEN(RIBBED METAL)P LSTOREFRONTGLAZINGRUSTICATEDCONCRETE BLOCKVEHICULARGUARDRAILS12'-6"FLOOR13'-6"MIN CLRDRIVEAISLE20'-0"24'-0"METAL CANOPY OVERPEDESTRIAN CROSSINGCLEAR ANODIZED METAL CANOPYANODIZED ALUMINUMCLAD COLUMNSFAUX WOODHIGH PRESSURE LAMINATE PANELS"TRESPA : METEON (NW10 ENGLISH CHERRY"27'-0"PARAPETBLACK ALUMINUM FACIAGFEDCBASLIDING METAL GATERUSTICATEDCONCRETE BLOCKTINTED TRANSOMGLASS, TYPICALHVAC EQUIP.SOLAR PANELSMECHANICAL SCREEN(RIBBED METAL)THIN BRICK VENEER TO MATCHADJACENT EXISTING GYMMETAL CANOPY OVERPEDESTRIAN CROSSING20'-0"FLOORPARAPETCELLULAR ANTENNAEENCLOSURE BYOTHERS21051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 06SCALE:WEST ELEVATION3/32"=1'-0"3SCALE:EAST (DOWNEY AVE) ELEVATION3/32"=1'-0"1A3.01EXTERIORELEVATIONSSCALE:BASKETBALL GYM - EAST ELEVATION32"=1'-0"2Attachment FAgenda Page 52

P LP LSTOREFRONTGLAZING12'-6"FLOOR13'-6"MIN CLRDRIVEAISLE24'-0"PAINTED STEELCOLUMNFAUX WOODHIGH PRESSURE LAMINATE PANELS"TRESPA : METEON (NW10 ENGLISH CHERRY"27'-0"PARAPET20'-0"CLEAR ANODIZED METALCANOPYMETAL CANOPYOVER PEDESTRIANCROSSINGCURTAIN WALLGLAZING SYSTEMFAUX WOODCLADDINGBLACK ALUMINUMFACIA1234RUSTICATEDCONCRETEBLOCKCELLULAR ANTENNAEENCLOSURE BYOTHERSSTOREFRONTGLAZINGRUSTICATEDCONCRETE BLOCKVEHICULARGUARDRAILS12'-6"FLOOR13'-6"MIN CLRDRIVEAISLEMETAL CANOPY OVERPEDESTRIANCROSSINGFAUX WOOD CLADDINGFAUX WOOD CLADDING27'-0"PARAPETDOWN LIGHTWALL MOUNTEDP LP L20'-0"MATCH EXISTING GYMMASONARYBLACK ALUMINUMFACIA1234MATCH EXISTING GYMMASONARYCELLULAR ANTENNAEENCLOSURE BYOTHERSTINTED TRANSOMGLASS, TYPICALMETAL MECHANICALSCREEN BEYOND27'-11"FLOORPARAPETEXISTING GYMMASONRYMATCH EXISTING GYMMASONRYCELLULAR ANTENNAEENCLOSURE BYOTHERS21051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 06SCALE:SOUTH ELEVATION3/32"=1'-0"3SCALE:NORTH (ARNETT ST.) ELEVATION3/32" = 1'-0"1A3.02EXTERIORELEVATIONSSCALE:BASKETBALL GYM - WEST ELEVATION3/32"=1'-0"2Attachment FAgenda Page 53

TREE LEGENDSYMBOL DESCRIPTIONQUANTITY*NOTES(E) TREE TO REMAINCallistemon sp.1SEE TREE PROTECTIONDETAIL L-XXX(E) TREE TO REMAINCupaniopsis sp.7(E) TREE TO REMAINPinus sp.8EBECEP1TREE LEGEND (CONTINUED)SYMBOL DESCRIPTIONQUANTITY*NOTES(E) TREE TO REMOVECupaniopsis sp.3(E) TREE TO REMOVEFicus sp.6(E) TREE TO REMOVEPodocarpus sp.1ECEFEPOTREE LEGEND (CONTINUED)SYMBOL DESCRIPTIONQUANTITY*NOTES(E) STREET TREE TOPROTECT IN PLACE3ESTTREE LEGEND (CONTINUED)SYMBOL DESCRIPTIONQUANTITY*NOTES(E) TREE TO REMOVEPinus sp.1(E) TREE TO REMOVEPinus sp.2(E) TREE TO REMOVESyagrus sp.2EP1EP2ESYECECEP1EP1EP1EP1EP1ECECECECECECECECARNETT STREETDOWNEY AVENUEEBESTESTESTEP2EP2EFEFEFEFEFEFESYESYEPOEP1EP1EP121051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:> RESERVED FOR CONSULTANT <NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 06LICENSEDLANDSCAPEARCH ITE C T ST ATEOFCALIFORNIASignature05-31-24Renewal DateDateSCOTTVANSOOYNo.5 5 0 5 10-6-23TREEPROTECTIONANDREMOVALPLANL0.10LANDSCAPE SHEET INDEXL0.10 TREE PROTECTION ANDREMOVAL PLANL1.10 CONSTRUCTION PLANL2.00 MATERIALS PALETTEL2.10 PLANT PALETTEL3.00 PLANT LEGENDL3.10 PLANTING PLANNORTH016' 32'SCALE 16 " = 1'8'Attachment FAgenda Page 54

EVCSEVCS7S8S9S10S11S12S13S14S15S17S18S19S20S21S22S23S24S25S26S27S28S29S30S31S32S33S34S35S36S37S41S40S39S42S43S58S57S56S55S54S53S52S51S50S49S48S47S46S61S62S63S64S65S66S67S68S69S70S71S72S60S7C6C5C4C2C3C1C4HC3HC2HC1EVCSEVCS5EVCSEVCS10S9S8S7S6S5S4S3S2S1S12S13S14S15S16S17S73EVCS44EVCS19HC11S6S16S38S45S59S18S10S9S8S7S6S5S4S3S2S1S12S13S14S15S16S17S19HC11S18SEVCSEVCS7S8S9S10S11S12S13S14S15S17S18S19S20S21S22S23S24S25S26S27S28S29S30S31S32S33S34S35S36S37S41S40S39S42S43S58S57S56S55S54S53S52S51S50S49S48S47S46S61S62S63S64S65S66S67S68S69S70S71S72S60S7C6C5C4C2C3C1C4HC3HC2HC1EVCSEVCSEVCS73EVCS44EVCS6S16S38S45S59S5555EVCSEVCSEVCSEVCSEVCSEVCSEVCSVCVCVCCEVCSCCCEVCSVCSEVCVVCEVCVCSEVEVEVCEVCSVCEVCSEVCVVVVEVCSVCEVVEVCCVCVVCVVVEVVVCCCCCCCCSSS10105958575655545352515049484746454443424140393837363534333231302223242526272829181920211314151617595857565554535251 50 49 48 47 46 45 44 4342 4140 39 38 37 36 35 34 33 32 31 3022232425262728291819202167891011 1245 131415 16173126789101112453125634HC6059585756555453606060575655542712T/RT/REP1EP1EP1EP1EP1ECECECECECECECEBESTESTESTMBFPEEPECCONSTRUCTIONPLANL1.10016' 32'SCALE 116" = 1'8'NORTHMUNICIPAL CODE NOTES1 SEE L0.10, TREE PROTECTION AND REMOVAL PLAN, FOR QUANTITY OF EXISTING TREES TO BE PROTECTED AND TO BE REMOVED2. TOTAL SQUARE FOOTAGE OF PLANTING = 13,636 SFLOPHOSTEMONCONFERTUS, TYPCHILOPSIS LINEARIS'SWEET BUBBA', TYP.IRRIGATION BACKFLOW PREVENTERSOPHORASECUNDIFLORA,TYP.TREE LEGENDGINKGO BILOBA 'PRINCETON SENTRY'- PRINCETON SENTRY MAIDENHAIR TREELOPHOSTEMON CONFERTUS - BRISBANE BOXCHILOPSIS LINEARIS 'SWEET BUBBA' - SWEET BUBBA DESERT WILLOWSOPHORA SECUNDIFLORA - TEXAS MOUNTAIN LAUREL6PROPERTY LINELINE OF BUILDING ABOVE234978121051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:> RESERVED FOR CONSULTANT <NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 06LICENSEDLANDSCAPEARCH ITE C T ST ATEOFCALIFORNIASignature05-31-24Renewal DateDateSCOTTVANSOOYNo.5 5 0 5 10-6-235EXISTING TREE TO REMAIN(SEE L0.10)LEGEND1 IN-GROUND PLANTING AREA, TYP.2 'NARROW MODULAR PAVERS' - CONCRETE, 6"x24", 2 COLORS, PATTERN AS SHOWN ON PLAN, TYP., BY STEPSTONE3 'VEGA' EASY CHAIR, TYP., BY QCP4 'LOLLYGAGGER' COFFEE TABLE, BY LOLL DESIGNS5 CORNER BENCH, 'LINK' MITERED BY LANDSCAPE FORMS6 'LINK' STRAIGHT BENCH, TYP., LANDSCAPE FORMS7 'LA' DRINKING FOUNTAIN, QCP8 'SORT' RECYLCING/GARBAGE SYSTEM, TYP., LANDSCAPE FORMS9 'WILLARD' BENCH, TYP., TOURNESOLDEDICATED LANDSCAPEWATER METERGINKGO BILOBA, TYP.Attachment FAgenda Page 55

21051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:> RESERVED FOR CONSULTANT <NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 06LICENSEDLANDSCAPEARCH ITE C T ST ATEOFCALIFORNIASignature05-31-24Renewal DateDateSCOTTVANSOOYNo.5 5 0 5 10-6-23MATERIALS PALETTEL2.00MATERIALS LEGEND1. ‘Narrow modular pavers” by Stepstone 2. ‘Vega’ easy chair, by QCP3. ‘Lollygagger’ coffee table by Loll Designs4. ‘Link’ mitered corner bench by Landscape Forms5. ‘Link’ straight bench by Landscape Forms6. ‘LA’ drinking fountain by QCP7. ‘Sort’ recycling/garbage system by Landscape Forms8. ‘Willard’ bench by Tournesol65432871Attachment FAgenda Page 56

21051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:> RESERVED FOR CONSULTANT <NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 06LICENSEDLANDSCAPEARCH ITE C T ST ATEOFCALIFORNIASignature05-31-24Renewal DateDateSCOTTVANSOOYNo.5 5 0 5 10-6-23PLANT PALETTEL2.10TREESOTHER PLANTSGinkgo biloba ‘Princeton Sentry’Maidenhair Tree40-50’ h x 20-25’ wMuhlenbergia rigensDeer Grass3-5’ h x 4-6’ wMyoporum parvifolium ‘Putah Creek’Creeping Myoporum<1’ h x 6-10’ wOlea ‘Montra’Little Ollie Dwarf Olive4-6’ h x wWestringia ‘Morning Light’Morning Light Coast Rosemary3-4’ h x wYucca ‘Golden Sword’Golden Sword Yucca3-4’ h x 5’ wLophostemon confertusBrisbane Box30-50’ h x 10-30’ w6RSKRUDVHFXQGLÀRUDTexas Mountain Laurel15-25’ h x 10-15’ wChilopsis linearis ‘Sweet Bubba’Sweet Bubba Desert Willow15-20’ h x 12-18’ wAchillea millefoliumCommon Yarrow1-3’ h x wAgave weberi ‘Arizona Star’Variegated Weber Agave4-5’ h x 6-8’ wBaccharis ‘Pigeon Point’Dwarf Coyote Brush1-2’ h x 6-8’ wCallistemon ‘Little John’ Dwarf Bottlebrush3-5’ h x 4-6’ wBouteloua ‘Blonde AmbitionBlue Grama Grass3’ h x wLeonotis leonurusLion’s Tail5-6’ h x 4-5’ wLeymus ‘Canyon Prince’Canyon Prince Wild Rye2-3’ h x wTuhlbaghia ‘Edinburgh’Big Violet Society Garlic2’ h x 2’ wCallistemon viminalis ‘Slim’Slim Callistemon8-10’ h x 3-4’ wCeanothus ‘Yankee Point’Yankee Point Ceanothus2-3’ h x 8-10’ wDasylirion wheeleriDesert Spoon4-6’ h x 3-4’ wEchinocactus grusoniGolden Barrel Cactus4’ h x 2.5’ wAttachment FAgenda Page 57

PLANT LEGENDTREESSYMBOL BOTANICAL NAMECOMMON NAMESIZEQTY*MATURE SIZE WATER USENOTESCHILOPSIS 'SWEET BUBBA'SWEET BUBBA DESERT WILLOW36"BOX615-20' H X 12-18'WLOWGINKGO BILOBA 'PRINCETON SENTRY'PRINCETON SENTRY MAIDENHAIRTREE36"BOX5 40-50' H X 20' WMODLOPHOSTEMON CONFERTUSBRISBANE BOX36"BOX14 30-40' H X 25' W MODSOPHORA SECUNDIFLORASILVER PESO MOUNTAIN LAUREL24"BOX315-20' H X 10-15'WLOWEXISTING TREE TO REMAINSEE L0.10ESHRUBS, SUCCULENTS, AND GROUND COVERSYMBOL BOTANICAL NAME COMMON NAME SIZEQTYMATURE SIZE WATER USE NOTESACHILLEA MILLEFOLIUM COMMON YARROW 1G 99 1-3' H X W LOWAGAVE WEBERI 'ARIZONA STAR' VARIEGATED WEBER AGAVE 10G 23 4-5' H X 6-8' W LOWBACCHARIS PILULARIS 'PIGEON POINT' DWARF COYOTE BUSH 5G 741-2' H X 6-8' WLOWBOUTELOUA GRACILIS 'BLONDEAMBITION'BLUE GRAMA GRASS 1G213' H X 3' W LOWCALLISTEMON 'LITTLE JOHN' LITTLE JOHN DWARF BOTTLEBRUSH 5G 223-4' H X 4-6' WLOWCALLISTEMON 'SLIM' SLIM BOTTLEBRUSH 15G55 8-10' H X 3-4' WLOWCEANOTHUS THYRSIFLORUS 'YANKEEPOINT'YANKEE POINT CEANOTHUS 5G 122-3' H X 8-10' WLOWDASYLIRION WHEELERI DESERT SPOON 15G 9 4-6' H X 3-4' W LOWECHINOCACTUS GRUSONI GOLDEN BARREL CACTUS 10G 12 4' H X 2 12' WLOWHESPERALOE PARVIFOLIA‘BRAKELIGHTS’BRAKELIGHTS RED YUCCA5G 17 2' H X WLOWLEONOTUS LEONURISLION'S TAIL15G 50 5-6' H X 4-5' W LOWLEYMUS CONDENSATUS 'CANYONPRINCE'CANYON PRINCE WILD RYE1G 109 2-3' H X WLOWMUHLENBERGIA RIGENSDEERGRASS5G50 4-6' H X WLOWMYOPORUM PARVIFOLIUM 'PUTAHCREEK'CREEPING MYOPORUM5G78 RESERVED FOR CONSULTANT <NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 04LICENSEDLANDSCAPEARCH ITE C T ST ATEOFCALIFORNIASignature05-31-24Renewal DateDateSCOTTVANSOOYNo.5 5 0 5 10-6-23Attachment FAgenda Page 58

EVCSEVCS7S8S9S10S11S12S13S14S15S17S18S19S20S21S22S23S24S25S26S27S28S29S30S31S32S33S34S35S36S37S41S40S39S42S43S58S57S56S55S54S53S52S51S50S49S48S47S46S61S62S63S64S65S66S67S68S69S70S71S72S60S7C6C5C4C2C3C1C4HC3HC2HC1EVCSEVCS5EVCSEVCS10S9S8S7S6S5S4S3S2S1S12S13S14S15S16S17S73EVCS44EVCS19HC11S6S16S38S45S59S18S5958575655545352515049484746454443424140393837363534333231302223242526272829181920211314151617595857565554535251 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 302223242526272829181920216 7 8 9 10 11 124 5 13 14 15 16 173126789101112453125634HC6059585756555453606060575655542712T/RT/REP1EP1EP1EP1EP1ECECECECECECECEBESTESTESTMBFPGGGGGGGGGGGGAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWAWSYMBOLBOTANICAL NAMECHILOPSIS'SWEET BUBBA'GINKGO BILOBA'PRINCETONSENTRY'LOPHOSTEMONCONFERTUSSOPHORASECUNDIFLORAACHILLEA MILLEFOLIUMAGAVE WEBERI'ARIZONA STAR'BACCHARIS PILULARISBOUTELOUA GRACILIS'BLONDE AMBITION'CALLISTEMON 'LITTLEJOHN'CALLISTEMON 'SLIM'CEANOTHUSTHYRSIFLORUS 'YANKEEPOINT'DASYLIRION WHEELERIECHINOCACTUSGRUSONIHESPERALOEPARVIFOLIA‘BRAKELIGHTS’LEONOTUS LEONURISLEYMUS CONDENSATUS'CANYON PRINCE'MUHLENBERGIA RIGENSMYOPORUMPARVIFOLIUM 'PUTAHCREEK'OLEA EUROPAEA'MONTRA'TULBAGHIA'EDINBURGH'WESTRINGIA 'MORNINGLIGHT'YUCCA FILAMENTOSA‘GOLDEN SWORD’AWGPLANTING PLANL3.10016' 32'SCALE 116" = 1'8'NORTH21051 WARNER CENTER LANESUITE 220WOODLAND HILLS,CA 91367WWW.TNIDESIGN.COMPH (818) 343-5393PROJECT DESCRIPTION:YMCADOWNEY11531 DOWNEYAVE.DOWNEY, CA90241SHEET:YYMMDD-DATE:DESCRIPTIONDATESHEET CONTENTS:> RESERVED FOR CONSULTANT <NEW GYMNASIUM CONSTRUCTION &ADDITION TO EXISTING FACILITIESPROJECT ADDRESS:REV.- - - - - - - - - - - - -YYMMDD-YYMMDD-YYMMDD-YYMMDD-TNI-PROJECT #2019-9071ARCHITECT:2023 - OCT - 06LICENSEDLANDSCAPEARCH ITE C T ST ATEOFCALIFORNIASignature05-31-24Renewal DateDateSCOTTVANSOOYNo.5 5 0 5 10-6-23ABBREVIATED PLANT LEGENDSEE L500 FOR FULL LEGENDAttachment FAgenda Page 59

EVCSEVCS7S8S9S10S11S12S13S14S15S17S18S19S20S21S22S23S24S25S26S27S28S29S30S31S32S33S34S35S36S37S41S40S39S42S43S58S57S56S55S54S53S52S51S50S49S48S47S46S61S62S63S64S65S66S67S68S69S70S71S72S60S7C6C5C4C2C3C1C4HC3HC2HC1EVCSTRASH TRASH
TRASH
TRASH
TRASH
TRASH
EVCS5EVCSEVCS10S9S8S7S6S5S4S3S2S1S12S13S14S15S16S17S73EVCS44EVCS18HC11S6S16S38S45S59SDOWNEY AVEARNETT ST1314 West Glenoaks Blvd, Ste 205 | Glendale, CA 91201 | 818.937.9229SHEETREVISION / ISSUENO.DATE11531 DOWNEY AVEDOWNEY, CA 90241YMCA DOWNEYSHEET TITLEENGINEER SEALSCALEPROJECTDATEDRAWN BYREVIEWED BY202305010.6.2023ZAZASITE LIGHTINGPHOTOMETRICPLANE1.011/16" = 1'-0"1SITE LIGHTING PHOTOMETRIC PLANAttachment FAgenda Page 60

--..
-------------� ...

Attachment G
Agenda Page 61

Metal FencingIn Dark Factory FinishMetal Mechanical Screen"Roofscreen : 7.2 Ribbed PanelConcrete Column/PilasterSmooth FinishKOLAR FAMILYYMCA OF DOWNEYAttachment GAgenda Page 62

------
Attachment G
Agenda Page 63

. ' ..:_., �-=---�--··'·-<� .. -· __.
... .:. ' ... �·. --.
-- -----------·- �--_,.,;:;.;----
Attachment G
Agenda Page 64

Metal FencingIn Dark Factory FinishMetal Mechanical Screen"Roofscreen : 7.2 Ribbed PanelConcrete Column/PilasterSmooth FinishAttachment GAgenda Page 65

'
1 ____________,
I
Attachment G
Agenda Page 66

Attachment G
Agenda Page 67

Attachment G
Agenda Page 68

� .•-'' . -
/'
.\
lY
I
zm ------....
•
r"
I
I ,"'4
·� I
I I
' .
(
I I
f • ..... � r
14 --Attachment G
Agenda Page 69

Attachment G
Agenda Page 70

Metal Fencing
In Dark Factory Finish
Metal Mechanical Screen
"Roofscreen : 7.2 Ribbed Panel Concrete Column/Pilaster Smooth Finish
Textured Plaster in Earth-tone
to match existing Brick
facade.

Fiberglass Reinforced
Plastic
Attachment G
Agenda Page 71

EXHIBIT "A"

LOT MERGER
CITY CASE NO.: LM 23-002

LEGAL DESCRIPTIONS -BEFORE LOT MERGER
PARCEL 1:

THAT PORTION OF THE RANCHO SANTA GERTRUDES, IN THE CITY OF DOWNEY, COUNTY OF LOS ANGELES, STATE OF CALIFORNIA, DESCRIBED AS FOLLOWS:

COMMENCING ON THE EASTERLY LINE OF THE 50 ACRE TRACT CONVEYED TO ELLEN BRAMLETTE, BY DEED RECORDED IN BOOK 9, PAGE 454 OF DEEDS, RECORDS OF SAID COUNTY, AT A POINT 522.74 FEET NORTH THEREON FROM THE SOUTHEAST CORNER OF SAID TRACT; THENCE NORTH 58° 10' WEST 4.545 CHAINS; THENCE NORTH 31° 10' EAST 100 FEET; THENCE SOUTH 58 ° 51' EAST 4.545 CHAINS; THENCE SOUTH 31 ° 10' WEST 100 FEET TO A POINT OF BEGINNING.

EXCEPT THEREFROM ANY PORTION EMBRACED WITHIN THE LINES OF THE COUNTY ROAD BOUNDING SAID PREMISES ON THE EASTERLY SIDE THEREOF.

PARCEL 2:

TWO ACRES, MORE OR LESS, IN THE RANCHO SANTA GERTRUDES, IN THE CITY OF

DOWNEY, COUNTY OF LOS ANGELES, STATE OF CALIFORNIA, DESCRIBED AS FOLLOWS:

COMMENCING ON THE EASTERLY LINE OF THE 50 ACRE TRACT CONVEYED TO ELLEN BRAMLETTE, BY DEED RECORDED IN BOOK 9, PAGE 454 OF DEEDS, RECORDS OF SAID COUNTY, AT A POINT 300 FEET NORTHERLY THEREON FROM THE SOUTHEASTERLY CORNER OF SAID TRACT; THENCE NORTH 58 ° 50' WEST ALONG THE NORTHERLY LINE OF LAND NOW OR FORMERLY BELONGING TO SUSAN N. BRAMLET, 4.545 CHAINS; THENCE NORTH 31 ° 10' EAST 4.89 CHAINS; THENCE SOUTH 58 ° 51' EAST 4.545 CHAINS; THENCE SOUTH 31° 10' WEST 4.89 CHAINS TO PLACE OF BEGINNING.

EXCEPT THEREFROM ANY PORTION EMBRACED WITHIN THE LINES OF THE COUNTY ROAD BOUNDING SAID PREMISES ON THE EASTERLY SIDE.

EXCEPT THEREFROM THE NORTHEASTERLY 100 FEET THEREOF.

ALSO EXCEPT THEREFROM THE SOUTHWESTE RLY 122.74 FEET THEREOF.

PARCEL 3:

THE SOUTHWESTERLY 122.74 FEET OF THE TWO ACRES, MORE OR LESS IN THE RANCHO SANTA GERTRUDE$, IN THE CITY OF DOWNEY, COUNTY OF LOS ANGELES, STATE OF CALIFORNIA, DESCRIBED AS FOLLOWS:

PAGE 1 OF 5
Attachment H
Agenda Page 72

COMMENCING ON THE EASTERLY LINE OF THE 50 ACRE TRACT CONVEYED TO ELLEN BRAMLETTE, BY DEED RECORDED IN BOOK 9, PAGE 454 OF DEEDS, RECORDS OF SAID COUNTY, AT A POINT 300 FEET NORTHERLY THEREON FROM THE SOUTHEASTERLY CORNER OF SAID TRACT; THENCE NORTH 58° 50' WEST ALONG THE NORTHERLY LINE OF LAND NOW OR FORMERLY BELONGING TO SUSAN N. BRAMLET, 4.545 CHAINS; THENCE NORTH 31 ° 10' EAST 4.89 CHAINS; THENCE SOUTH 58 ° 51' EAST 4.545 CHAINS; THENCE SOUTH 31 ° 10' WEST 4.89 CHAINS TO PLACE OF BEGINNING.

EXCEPT THEREFROM ANY PORTION EMBRACED WITHIN THE LINES OF THE COUNTY ROAD BOUNDING SAID PREMISES ON THE EASTERLY SIDE.

ALSO EXCEPT THEREFROM THE NORTHEASTERLY 100 FEET THEREOF.

PARCEL 4:

THAT PORTION OF THE RANCHO SANTA GERTRUDES, IN THE CITY OF DOWNEY,

COUNTY OF LOS ANGELES, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 1, PAGES 156 THROUGH 158 INCLUSIVE OF PATENTS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS:

BEGINNING AT THE INTERSECTION OF THE NORTHWESTERLY LINE OF DOWNEY AVENUE (50.00 FEET WIDE) WITH THE SOUTHWESTERLY LINE OF ARNETT STREET, AS SAID AVENUE AND STREET ARE SHOWN ON THE MAP OF TRACT NO. 13240, RECORDED IN BOOK 266, PAGES 23 AND 24 OF MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY; THENCE NORTH 58 DEGREES 57 MINUTES 12 SECONDS WEST ALONG SAID ARNETT STREET, A DISTANCE OF 167.50 FEET TO THE NORTHEAST CORNER OF LOT 69 OF SAID TRACT NO. 13240; THENCE SOUTH 31 DEGREES 08 MINUTES 20

SECONDS WEST, ALONG THE SOUTHEASTERLY LINE OF SAID LOT, A DISTANCE OF

71.68 FEET TO THE SOUTHEAST CORNER THEREOF; THENCE SOUTH 58 DEGREES 53 MINUTES 40 SECONDS EAST, ALONG THE SOUTHEASTERLY PROLONGATION OF THE SOUTHWESTERLY LINE OF SAID LOT 69, A DISTANCE OF 167.50 FEET TO THE NORTHWEST LINE OF SAID DOWNEY AVENUE; THENCE NORTH 31 DEGREES 08 MINUTES 20 SECONDS EAST, ALONG SAID DOWNEY AVENUE, A DISTANCE OF 71.85 FEET TO THE POINT OF BEGINNING.

EXCEPT THAT PORTION LYING SOUTHEASTERLY OF THE FOLLOWING DESCRIBED LINE:

BEGINNING AT THE NORTHEAST CORNER OF SAID LOT 69; THENCE SOUTH 58 DEGREES 57 MINUTES 12 SECONDS EAST ALONG SAID ARNETT STREET, A DISTANCE OF 65.27 FEET TO THE TRUE POINT OF BEGINNING; THENCE SOUTHERLY IN A DIRECT

LINE TO A POINT ON SAID SOUTHEASTERLY PROLONGATION OF THE SOUTHWESTERLY LINE OF SAID LOT 69, DI STANT THEREON SOUTH 58 DEGREES 53 MINUTES 40 SECONDS EAST 65.13 FEET FROM THE SOUTHEAST CORNER OF SAID LOT 69.

ALSO EXCEPT THEREFROM AN UNDIVIDED ONE-HALF INTEREST IN ALL OIL, GAS,

AND/OR MINERALS IN AND UNDER SAID LAND AS RESERVED IN DEED FROM BANK OF AMERICA, RECORDED IN BOOK 14081, PAGE 140 OFFICIAL RECORDS.

PARCEL 5:

THAT PORTION OF THE RANCHO SANTA GERTRUDES, IN THE CITY OF DOWNEY,

COUNTY OF LOS ANGELES, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 1, PAGE 156 TO 158 INCLUSIVE OF PATENTS, IN THE OFFICE OF THE COUNTY PAGE 2 OF 5
Attachment H
Agenda Page 73

RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS:

BEGINN ING AT THE INTERSECTION OF THE NORTHWESTERLY LINE OF DOWNEY AVENUE (50.00 FEET WIDE) WITH THE SOUTHWESTERLY LINE OF ARNETT STREET, AS SAID AVENUE AND STREET ARE SHOWN ON THE MAP OF TRACT NO. 13240, RECORDED IN BOOK 266, PAGE 23 AND 24 OF MAPS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY; THENCE NORTH 58° 57' 12" WEST, ALONG SAID ARNETT STREET, A DISTANCE OF 167.50 FEET TO THE NORTHEASTERLY CORNER OF LOT 69, OF SAID TRACT NO. 13240; THENCE SOUTH 31 ° 08' 20" WEST ALONG THE SOUTHEASTERLY LINE OF SAID LOT A DISTANCE OF 71.68 FEET TO THE SOUTHEASTERLY CORNER THEREOF; THENCE SOUTH 58 ° 53' 40" EAST, ALONG THE SOUTHEASTERLY PROLONGATION OF THE SOUTHWESTERLY LINE OF SAID LOT 69, A DISTANCE OF 167.50 FEET TO THE NORTHWEST LINE OF SAID DOWNEY AVENUE; THENCE NORTH 31 ° 08' 20" EAST, ALONG SAID DOWNEY AVENUE A DISTANCE OF 71.85 FEET TO THE POINT OF BEGINNING.

EXCEPTING THAT PORTION OF SAID LAND LYING NORTHWESTERLY OF THE FOLLOWING LINE:

BEGINN ING AT THE NORTHEASTERLY CORNER OF SAID LOT 69; THENCE SOUTH 58° 57' 12" EAST; ALONG SAID ARNETT STREET, A DISTANCE OF 65.27 FEET TO THE TRUE POINT OF BEGINNING; THENCE SOUTHERLY IN A DIRECT LINE TO SAID SOUTHEASTERLY PROLONGATION OF THE SOUTHWESTERLY LINE OF SAID LOT 69 OF TRACT NO. 13240, DISTANCE THEREON SOUTH 58° 53' 40" EAST 65.13 FEET FROM THE SOUTHEASTERLY CORNER OF SAID LOT 69.

PAGE30F 5
Attachment H
Agenda Page 74

LEGAL DESCRIPTION -AFTER LOT MERGER

THAT PORTION OF THE RANCHO SANTA GERTRUDES, IN THE CITY OF DOWNEY,

COUNTY OF LOS ANGELES, STATE OF CALIFORNIA, AS PER MAP RECORDED IN BOOK 1, PAGES 156 TO 158, INCLUSIVE OF PATENTS, IN THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS:

BEGINN ING AT A POINT ON THE ON THE SOUTHEASTERLY LINE OF THE 50 ACRE TRACT CONVEYED TO ELLEN BRAMLETTE, BY DEED RECORDED IN BOOK 9, PAGE 454 OF DEEDS, RECORDS OF SAID COUNTY, 300.00 FEET NORTHEASTERLY FROM THE MOST SOUTHERLY CORNER OF SAID TRACT; THENCE, ALONG THE NORTHEASTERLY LINE OF LAND NOW OR FORMERLY BELONGING TO SUSAN M. BRAMLETT, NORTH 58°56'15" WEST 43.65 FEET TO A LINE PARALLEL WITH AND 40.00 FEET DISTANT

NORTHWESTERLY, MEASURED AT RIGHT ANGLES TO THE CENTERLINE OF DOWNEY AVENUE SHOWN ON MAP C.S.B-1846 ON FILE IN THE OFFICE OF THE COUNTY SURVEYOR OF SAID COUNTY AND THE TRUE POINT OF BEGINNING; THENCE, CONTINUING ALONG SAID NORTHEASTERLY LINE, NORTH 58°56'15" WEST 256.34 FEET TO THE SOUTHEASTERLY LINE OF TRACT NO. 13240 RECORDED IN BOOK 266 PAGES 23 AND 24 OF MAPS IN THE OFFICE OF SAID COUNTY RECORDER; THENCE, ALONG SA1D SOUTHEASTERLY LINE, NORTH 30°17'00" 319.59 FEET; THENCE, CONTINUING ALONG SAID SOUTHEASTERLY LINE, NORTH 31 °08'20" EAST 3.45 FEET TO THE SOUTHWESTERLY LINE OF SAID TRACT NO. 13240; THENCE, ALONG SAID SOUTHWESTERLY LINE, SOUTH 58°53'40" EAST 107.58 FEET TO THE MOST SOUTHERLY CORNER OF LOT 69 OF SAID TRACT NO. 13240; THENCE, ALONG THE SOUTHEASTERLY LINE OF SAID LOT 69, NORTH 31 °08'20" EAST 71.67 FEET TO THE SOUTHWESTERLY LINE OF ARNETT STREET, 60.00 FEET WIDE, AS SHOWN ON SAID TRACT NO. 13240; THENCE, ALONG SAID SOUTHWESTERLY LINE, SOUTH 58°57'12" EAST 167.35 FEET TO THE NORTHWESTERLY LINE OF DOWNEY AVENUE, 50.00 FEET WIDE, AS SHOWN ON SAID TRACT NO. 13240; THENCE, ALONG SAID NORTHWESTERLY LINE, SOUTH 31°08'03" WEST 71.85 FEET TO THE SOUTHEASTERLY PROLONGATION OF SAID SOUTHWESTERLY LINE OF TRACT NO. 13240; THENCE, ALONG SAID PROLONGATION, NORTH 58°53'40" WEST 15.02 FEET TO SAID PARALLEL LINE DISTANT 40.00 FEET

NORTHWESTERLY, MEASURED ATT RIGHT ANGLES OR CONCENTRIC TO THE

CENTERLINE OF DOWNEY AVENUE, BEING THE BEGINNING ON A NON-TANGENT CURVE CONCAVE NORTHWESTERLY HAVING A RADIUS OF 1960.00 FEET, A RADIAL LINE TO WHICH BEARS SOUTH 59 °16'49" EAST, BEING TANGENT AT ITS ENDPOINT WITH SAID PARALLEL LINE DISTANT 40.00 FEET NORTHWESTERLY, MEASURED AT RIGHT ANGLES OR CONCENTRIC TO THE CENTERLINE OF DOWNEY AVENUE; THENCE, ALONG SAID CURVE IN A SOUTHWESTERLY DIRECTION, THROUGH A CENTRAL ANGLE OF 00°12'33" AN ARC LENGTH OF 7.15 FEET; THENCE, TANGENT TO SAID CURVE AND ALONG SAID PARALLEL LINE, SOUTH 30 °55'44" WEST 315.65 FEET TO THE TRUE POINT OF BEGINNING.

PAGE4 OF 5
Attachment H
Agenda Page 75

SEE EXHIBIT "B" FOR PLAT DEPICTING THE ABOVE-DESCRIBED AREA.

THIS EGAL DESCRIPTION HAS BEEN PREPARED BY MY OR UNDER MY DIRECTION. 07-17-2024
DATE
PAGE 5 OF 5
Attachment H
Agenda Page 76

t r ) h hC'.J vv I -,:_o-r.n C'.J C::� v-...'
_{'Q__
_()_-,.. ..,,._
C::0 f-- oJL
()
_ z w
> -.,� LU r--: M z � s::• N .- N MN z
¥ 'T ' -' -' � LOT Ll�E TO
;;;BE MERGEDz
$-; � 0 . �-' 0 0 ,..,_ �I (l)U � � g �r � PARCEL 3 N N

C/L DAVIS

STREET ---
P.O.B. PARCEL 1
\� _ _._ _____________ -t-_ \_11...-P.O.B. PARCELS 2 & 3·-Nsa·sow 299.97' -1 LINE TABLE:

L 1 S56°53'40"E 167.50'
L2 N31°08'03"E 71.85'
I '-SE'L Y LINE BOOK 9
.

SHEET 1 OF 2
\'\
SCALE: 1"=80'
0 <10 80 i I I

ALL DEED DISTANCES GIVEN IN

CHAINS HAVE BEEN CONVERTED
TO FEET. �SW'LY LINE BOOK 9
PAGE 454 OF DEEDS
f PAGE 454 OF DEEDS
E'L Y COR. BOOK 9
AGE 454 OF DEEDS
I
07-17-2024
PREPARED BY:

DRG, INC.
601 EAST DAILY DRIVE, SUITE 225CAMARILLO, CA 93010
805-987-3945 FAX: 805-987-1655
JOB NO. 2316 APRIL 2024
Attachment H
Agenda Page 77

N _J r r ) h h ('� vv
I
---C�)­f..{) C'� h::: v._l
_ru_
_()_-.,, "'--h'1 f--v'­() _ �I M Z;,. � w,. - > :g� -&.J 1 oW (') z (I)� 0 ...J Cl o
-' C) -...J �r

C/L DAVIS

STREET ---
T.P.0.B.\ /-I P.O.B. IE-------------------:;f;--·\ L1 N58"56'15"W 256.34' LINE TABLE: L 1 N58"56'15"W 43.65' L2 N31 °08'20"E 3.45' L3 s31•oa•o3•w11.s5• L4 N58"53'40"W 15.02' CURVE TABLE: C1 6=0"12'33" R=1960.00' L=7.15' C2 6=1"40'37" R=1960.00' L=57.37' CJ li=87°59'46" R=15.00' L=23.04' gl � 40' b j I i ii SEU LINE BOOK 9/ -fl PAGE 454 OF DEEDS � -NS-8°56-'15-"W E'LY COR. BOOK 9 \_ SWL Y LINE BOOK 9 PAGE 454 OF DEEDS PAGE 454 OF DEEDS I SHEET 2 OF 2
\ -�\
SCALE: 1 "=80'
40 80 !I I
07-17-2024
LEGEND: PREPARED BY:
�INDICATES PUBLIC ROAD EASEMENT
�PER DEEDS RECORDED 11/17/1947
IN BOOK 25419 PAGE 279, O.R. &
03/18/1965 AS INST. NO. 3144, O.R.

DRG, INC.
601 EAST DAILY DRIVE, SUITE 225
CAMARILLO, CA 93010
805-987-3945 FAX: 805-987-1655
JOB NO. 2316 APRIL 2024
Attachment H
Agenda Page 78

JN 1314-001

CATEGORICAL EXEMPTION MEMO
TO: City of Downey, Community Development
Department – Planning Division

FROM: Nicole Morse, Esq., Principal
DATE: September 17, 2024

RE: CEQA Class 32 Exemption – YMCA Downey

I. PROJECT UNDERSTANDING
YMCA of Metropolitan Los Angeles (“Project Applicant”) seeks to redevelop an approximately 2.16-acre property located northwest of Downey Avenue, south of Firestone Boulevard, and east of Paramount Boulevard in the City of Downey (“City”), County of Los Angeles. The subject property’s Assessor’s Parcel Numbers (APNs) are 6255- 013-032, -033, and -034 (“Project site”). The Project site is currently developed with four (4) existing structures totaling approximately 61,756 square feet (sf).

As part of the Project, the majority of existing structures would be demolished. The existing 7,625 sf basketball gymnasium would remain and be remodeled as part of the Project. Additionally, the Project proposes the construction of a new approximately 18,808 sf gymnasium and 975 sf lobby/restroom area. The new gymnasium would include amenities such as fitness areas, locker rooms, kitchen and office areas, and an indoor pool. New landscaping would be installed around the perimeter of the site.

Figure I-1 illustrates the areas of the site to be demolished. Figure I-2 presents the proposed Site Plan.

The information presented in this Memorandum is based on our review and analysis of the following documents and information: (a) materials provided by the Project Applicant regarding the proposed Project; (b) publicly available documents and information from the City of Downey website, including but not limited to the City’s General Plan, Zoning and Land Use Code, and (c) information provided by the City of Downey staff.

Attachment I.A
Agenda Page 79

Exhibit H.1Attachment I.A
Agenda Page 80

Exhibit H.1Attachment I.A
Agenda Page 81

CEQA Class 32 Exemption – YMCA Downey
September 17, 2024

Page 4 of 10 ends

II. EXISTING CONDITIONS
A. Existing Land Use
The Project site consists of three (3) lots totaling 94,185 sf/2.16 acres located at 11531 Downey Avenue in the City of Downey. All three lots are under the common ownership of the Applicant. The subject site is developed with one recreational building (built 1963), one commercial building (built 1965), and one single-family residence with detached garage (built between 1947 and 1950) totaling approximately 61,756 sf.

B. Existing General Plan Designation
The City of Downey General Plan designates the Project site as Office (O). The Office (O) land use designation allows for professional and medical office uses. The intensity of the Office designation should fall within a range of floor area ratio between 0.5:1 and 5:1. The Project is consistent with the City’s General Plan land use designation of Office (O).

C. Existing Zoning
The Project site is located within the Commercial – Professional Office (C-P) zone and Open Space (O-S) zone. APN 6255-013-032 is zoned O-S and APNs 6255-013-033 and 6255-013-034 are zoned C-P.

The C-P Zone is intended to provide for the development of integrated office and professional areas wherein related types of uses and facilities may also be located. The provisions of this zone are intended to encourage the most desirable relationship of permitted uses and to provide a transition between more intensive commercial activities and resident ial areas.

The O-S Zone is intended to prevent incompatible development in areas that should be preserved or regulated for scenic, recreational, conservation, aesthetic, or health and safety purposes. The O-S Zone may also provide for permanent open space in the community by limiting development in areas which may contain geological features that may affect the structural use of the site.

According to Downey Municipal Code (DMC) §9314.04, recreational facilities could be allowed in the C-P Zone through the issuance of a Conditional Use Permit (CUP). Recreational facilities are permitted under the O -S Zone according to DMC §9322.04. Development standards for properties within the C-P and O-S Zone are provided for in DMC §9314 and §9322, respectively. The Project is consistent with the C-P and O-S zoning.

Property Development Standards and Project Summary

C-P Development
Standards
O-S Development
Standards Project
Lot Area – minimum (sf) 6,000 sf No Requirement (NR) 94,185 sf (2.16 acres) Lot Coverage – maximum (%) 50% (47,094 sf) NR 29% (27,408 sf) Floor Area Ratio
• Lots 87,120 sf or greater 2.0 NR 0.29
• Lots under 87,120 sf N/A NR N/A
Building Height – maximum (feet) 75 ft or 5 stories 30 feet or 2 stories 26 ft Attachment I.A
Agenda Page 82

CEQA Class 32 Exemption – YMCA Downey
September 17, 2024

Page 5 of 10 ends

C-P Development
Standards
O-S Development
Standards Project
Yard Setbacks – minimum (feet)
• Front 10 ft min. 20 20 ft
• Side
• Interior
o Abutting a residential zone
o Abutting a nonresidential
zone
• Street (abutting major roads)
• Street (abutting all other
streets)

o 46 ft min.
o 5 ft min.

• 10 ft min.
• 5 ft min.

o 46 ft min.
o NR

• 20 ft min.

o 46 ft
o N/A

• 10 ft

• Rear
• Abutting a residential zone
• Abutting a nonresidential zone

• 46 ft min.
• 15 ft min.

• 46 ft min.
• 20 ft min.

• 46 ft
• 20 ft
Building Separation – minimum (feet) 20 ft min. 20 ft min. 26 ft min.

Parking 91 spaces 91 spaces 99 spaces on-site
42 existing spaces
off-site
Landscaping 4,565 sf 4,565 sf 4,931 sf

D. Surrounding Land Uses
Surrounding land uses include residential and office uses within the City of Downey limits. Specifically, the Project site is surrounded by single-family residences to the north; multi-family residences to the south; offices to the east; and single-family residences to the west. Surrounding land uses are zoned R-1 to the north and west; R-3 to the south; and C-P to the east. The Project is consistent with the General Plan and zoning and, therefore, would complement surrounding development.

III. CEQA CATEGORICAL EXEMPTION

A. Class 32 Exemption
CEQA Guidelines Section 15332, In-Fill Development Projects, states that a Class 32 exemption consists of projects characterized as in-fill development meeting the conditions described below.

(a) The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations.

(b) The proposed development occurs within city limits on a project site of no more than five acres substantially surrounded by urban uses.

(c) The project site has no value as habitat for endangered, rare or threatened species.

Attachment I.A
Agenda Page 83

CEQA Class 32 Exemption – YMCA Downey
September 17, 2024

Page 6 of 10 ends

(d) Approval of the project would not result in any significant effects relating to traffic, noise, air quality, or water quality.

(e) The site can be adequately served by all required utilities and public services.

The Project site is currently zoned C-P and O-S and has a General Plan land use designation of O. The Project is permitted, or conditionally permitted, within these designations. The Project would be implemented consistent with all applicable General Plan and zoning policies and regulations. As part of Project approval, the Project includes a request to amend the zoning designation for the property located at 11531 Downey Avenue (APN 6255-013-032) from the O-S zone to the C-P zone. This zone change request is needed in order to correct inconsistencies between the City’s Zoning Map and General Plan Land Use Designation map. The corresponding appropriate land use zoning designation for the General Plan land use designation of Office (O) is the C-P zone.

This zone change request is a corrective matter is in accordance with State law and does not bestow any special privilege upon the property that would not otherwise be permissible in the current zoning designation.

Additionally, the Project site encompasses approximately 2.16 acres, located within the City of Downey limits.

Surrounding land uses include residential and office uses. Therefore, the proposed development occurs within City limits on a site of no more than five acres substantially surrounded by urban uses.

The Project site is currently developed with urban uses surrounded by typical ornamental landscaping. According to the Department of Fish and Wildlife Service’s National Wetland Mapper, the Project site does not contain any wetland, riparian habitat or other sensitive natural community.1 The Project site is currently developed and located in an urbanized area of the City. The Project site is located within an area that has not been identified as containing species identified as a candidate, sensitive, or special status species in local or regional plans, policies or regulations or by the California Department of Fish and Wildlife or the U.S. Fish and Wildlife Service. Therefore, the Project site has no value as habitat for endangered, rare or threatened species.

The construction and operation of a project of this scale would not typically result in significant environmental impacts. For Class 32 Exemptions, the City requires the following reports: Air Quality /Greenhouse Gas (GHG) Assessment; Noise Study; Trip Generation Assessment; and Vehicle Miles Traveled (VMT) Screening Evaluation.

These reports have been prepared to support the finding of a Class 32 exemption for the Project and are summarized below.

Trip Generation Assessment
The Project-specific Trip Generation Assessment is presented as Attachment A to this Memorandum. Pursuant to City of Downey requirements, the Trip Generation Assessment was conducted consistent with the County of Los Angeles Transportation Impact Analysis Guidelines (July 23, 2020) (County Guidelines).

YMCA was in operation at the Project site for 54 years, starting in 1966. The site became fully operational in 1977 and was fully operational for 43 years until March 2020 when it was shut down due to COVID-19. The existing structures on the Project site are currently vacant and could be re-occupied with uses consistent with the underlying zoning. The Project-specific Trip Generation Assessment used empirical data collected at two other

1 https://fwsprimary.wim.usgs.gov/wetlands/apps/wetlands-mapper/ Attachment I.A
Agenda Page 84

CEQA Class 32 Exemption – YMCA Downey
September 17, 2024

Page 7 of 10 ends

existing YMCA facilities with similar operations to calculate the historic operational levels of the previously occupied YMCA structures and establish the existing environmental conditions baseline. The Trip Generation Assessment concluded that the Project would result in a net reduction of 608 two -way daily vehicle trips when compared to the prior use of the Project site. The County Guidelines indicate that any development project which can demonstrate a net increase in the daily trip generation of less than 110 two -way trips per day would not require the preparation of a Transportation Impact Analysis. Based on the results of the Trip Generation Analysis, the Project would generate fewer than 110 net new daily trips. As such, additional traffic analysis is not required for this Project.

VMT Screening Evaluation
The Project VMT Screening Evaluation is presented as Attachment B to this Memorandum.

The County Guidelines provide details on screening criteria that are used to identify when a project is anticipated to result in a less than significant transportation impact. The screening criteria identified within the County Guidelines are:

• Non-Retail Project Trip Generation Screening (generates less than 110 net new daily trips) • Retail Project Site Plan Screening
• Proximity to Transit Based Screening
• Residential Land Use Based Screening

A project needs only meet one of the above screening criteria to be excused from further VMT analysis. As stated above, the Project would not generate more than 110 net new daily trips, and as such, meets the Non-Retail Project Trip Generation Screening criteria. Pursuant to County Guidelines, no further VMT analysis is required.

Air Quality and Greenhouse Gas Emissions
Project-related operational air quality impacts and operational greenhouse gas emissions derive primarily from vehicle trips generated by the Project. According to the Air Quality & Greenhouse Gas Assessment (Attachment C of this Memorandum), the proposed Project would not result in an exceedance of the SCAQMD regional significance threshold for construction-source or operational-source emissions.

As shown in Table 6 of the Assessment, the Project is anticipated to generate less emissions per day for pollutants of VOC, NOX, CO, SOX, PM10, and PM2.5 as compared to emissions generated by the existing uses. Project emissions would not exceed applicable thresholds.

Additionally, Table 12 of the Assessment shows that the Project is anticipated to generate less GHG emissions per day as compared to emissions generated by the existing uses. The Project would result in a net decrease of approximately 463.70 MTCO2e/yr; the proposed Project would not exceed the SCAQMD’s numeric threshold of 3,000 MTCO2e/yr.

Noise Assessment
The Project Noise Assessment is presented as Attachment D to this Memorandum.

According to City Municipal Code Section 4606.5, construction noise shall not occur between 9:00 p.m. and 7:00 a.m., nor should construction noise exceed 85 dBA Lmax across any property boundary at any time. As presented Attachment I.A
Agenda Page 85

CEQA Class 32 Exemption – YMCA Downey
September 17, 2024

Page 8 of 10 ends

in Table 3 of the Noise Assessment, peak noise levels associated with Project construction are expected to reach up to 78.8 dBA Lmax. As such, construction noise would not exceed City thresholds.

Project-related operational noise sources are expected to include a pickleball court, roof-top air conditioning units, and parking lot vehicle movements. It is noted that the Project includes a 10-foot high Acoustifence along the pickleball court, as shown in Exhibit 4 of the Noise Assessment. Additionally, the pickleball court would be closed during the nighttime hours. The City of Downey Municipal Code, Chapter 6 Section 4606.3, identifies exterior noise levels standards of 55 dBA Leq for the daytime hours (7:00 a.m. to 10:00 p.m.) and 45 dBA Leq during the nighttime (10:00 p.m. to 7:00 a.m.) hours. As shown in Table 2 of the Noise Assessment, peak operational noise levels for the Project would reach up to 47.8 dBA Leq during the daytime hours and 43.0 dBA Leq during the nighttime hours at nearby sensitive receptors. As such, operational noise would not exceed City thresholds.

Utilities and Public Services
The Project site is currently served by existing utilities and public services. The Project represents an approximate 34,348 sf reduction in on-site uses (61,756 sf of existing uses minus 27,408 sf of proposed new uses), with corollary reductions in utilities and public services demands. The Project would implement all necessary on-site utility and storm water management infrastructure, consistent with City requirements. Therefore, the site can be adequately served by all required utilities and public services.

B. Review Of Exceptions to The Categorical Exemption
CEQA Guidelines include exceptions to all exemptions. As codified in Guidelines Section 15300.2, a project that would otherwise fit into an exemption must not be disqualified by the following sections:

a) Location. Classes 3, 4, 5, 6, and 11 are qualified by consideration of where the project is to be located – a project that is ordinarily insignificant in its impact on the environment may in a particularly sensitive environment be significant. Therefore, these classes are considered to apply all instances, except where the project may impact on an environmental resource of hazardous or critical concern where designated, precisely mapped, and officially adopted pursuant to law by federal, state, or local agencies. b) Cumulative Impact. All exemptions for these classes are inapplicable when the cumulative impact of successive projects of the same type in the same place, over time is significant. c) Significant Effect. A categorical exemption shall not be used for an activity where there is a reasonable possibility that the activity will have a significant effect on the environment due to unusual circumstances. d) Scenic Highways. A categorical exemption shall not be used for a project which may result in damage to scenic resources, including but not limited to, trees, historic buildings, rock outcroppings, or similar resources, within a highway officially designated as a state scenic highway. This does not apply to improvements which are required as mitigation by an adopted negative declaration or certified EIR. e) Hazardous Waste Sites. A categorical exemption shall not be used for a project located on a site which is included on any list compiled pursuant to Section 65962.5 of the Government Code. f) Historical Resources. A categorical exemption shall not be used for a project which may cause a substantial adverse change in the significance of a historical resource.

The applicability of the above-listed conditions to the YMCA Project is discussed below.

Attachment I.A
Agenda Page 86

CEQA Class 32 Exemption – YMCA Downey
September 17, 2024

Page 9 of 10 ends

a) This Condition would not apply under a Class 32 exemption, as it only applies to Classes 3, 4, 5, 6, and 11.

b) As presented within this Memorandum, the Project would not result in any significant individual or cumulative environmental impacts. As such, Condition b) is not applicable to the Project.

c) No significant effects would occur as a result of the Project. The Project represents the redevelopment of typical urban uses within a developed area of the City. No unusual circumstances exist. As such, Condition c) is not applicable to the Project.

d) According to the California Department of Transportation (Caltrans) California Scenic Highway Mapping System, the nearest officially designated state scenic highway is a portion of California State Route 91 located approximately 18.5 miles to the southeast. This section of scenic highway is not visible from the Project site or surrounding areas.2 As such, the Project would not result in damage to scenic resources within a highway officially designated as a state scenic highway; Condition d) is not applicable.

e) Pursuant to Government Code Section 65962.5, the Hazardous Waste and Substances Sites (Cortese) List is a planning document used by the State and local agencies to comply with the California Environmental Quality Act requirements in providing information about the location of hazardous materials release sites.

Below are the data resources that provide information regarding the facilities or sites identified as meeting the Cortese List requirements.

• List of Hazardous Waste and Substances sites from Department of Toxic Substances Control (DTSC) EnviroStor database.

• List of Leaking Underground Storage Tank Sites from the State Water Board’s GeoTracker database.

• List of solid waste disposal sites identified by Water Board with waste constituents above hazardous waste levels outside the waste management unit.

• List of “active” Cease and Desist Orders and Cleanup and Abatement Orders from Water Board.

• List of hazardous waste facilities subject to corrective action pursuant to Section 25187.5 of the Health and Safety Code, identified by DTSC.

Based on a review of the Cortese List maintained by the CalEPA, the Project site is not identified as a hazardous materials site pursuant to Government Code Section 65962.5. 3 Additionally, the Project’s Phase 1 ESA (Attachment E of this Memorandum) revealed no evidence of any recognized environmental conditions (RECs) in connection with the Project site. Condition e) would not apply.

f) Condition f) requires consideration of whether the Project may cause a substantial adverse change in the significance of a historical resource. The definition of "historical resources" is contained in CEQA

2 https://caltrans.maps.arcgis.com/apps/webappviewer/index.html?id=465dfd3d807c46cc8e8057116f1aacaa . 3 https://calepa.ca.gov/sitecleanup/corteselist/
Attachment I.A
Agenda Page 87

CEQA Class 32 Exemption – YMCA Downey
September 17, 2024

Page 10 of 10 ends

Guidelines Section 15064.5. Buildings that are 50 years or older are required to be evaluated to determine whether they meet the criteria to be considered significant historical resources.

The structures on the Project site meet the 50-year age threshold for evaluation. To this end, a Cultural Resources Study (Attachment F of this Memorandum) was prepared for the Project to locate and record any cultural resources within the site. The Study concluded that none of the structures on the Project site are associated with significant individuals, significant architectural examples, or are able to provide more information regarding the history of Downey or the State of California. As such, the on-site buildings are not considered historically significant under CEQA. The Project would not cause a substantial adverse change in the significance of a historical resource.

C. Conclusion
Based on the technical analyses prepared for the Project, the Project would not result in any significant environmental impacts. Additionally, the Project meets the conditions of a Class 32 exemption and would not conflict with any of the exceptions as codified in CEQA Guidelines Section 15300.

Attachment I.A
Agenda Page 88

DATE: May 14, 2024
TO: Nicole Morse, T&B Planning, Inc.

FROM: Bill Lawson, Urban Crossroads, Inc.

JOB NO: 15985-02 NA

YMCA DOWNEY NOISE ASSESSMENT
Nicole Morse,
Urban Crossroads, Inc. is pleased to provide the following Noise Assessment for the YMCA Downey (Project), which is at 11531 Downey Avenue which is northwest of Downey Avenue, south of Firestone Boulevard, and east of Paramount Boulevard in the City of Downey (Assessor’s Parcel Numbers [APNs] 6255-013-032, -033, and -034).

PROJECT OVERVIEW
The site is currently developed with 3 structures totaling 61,756 square feet (3,254- square-foot building at 11525 Downey Avenue, 57,673-square-foot building at 11531 Downey Avenue, and 829-square-foot building at 8268 Arnett Street). The site was previously occupied by a YMCA which is currently not operational. The Project includes demolition of the existing structures on -site and developing an 18,808-square-foot gymnasium, 975-square-foot lobby/restrooms, and retrofitting of an approximate 7,625-square-foot existing gymnasium (total of 27,408 square feet). A preliminary site plan for the proposed Project is shown in Exhibit 1. The proposed Project is anticipated to have an opening year of 2026.

SUMMARY OF FINDINGS
The Noise Assessment shows that the Project will not exceed the established City of Downey operational or construction noise thresholds with nighttime restrictions and the installation of a 10-foot high Acoustifence for the planned pickleball court. Therefore, the Project operational and construction noise impacts are considered less than significant at the nearby noise-sensitive receiver locations.

Attachment I.B
Agenda Page 89

Nicole Morse, T&B Planning, Inc.

May 14, 2024

Page 2 of 9 ends

15985-03 NA
EXHIBIT 1: SITE PLAN

Attachment I.B
Agenda Page 90

Nicole Morse, T&B Planning, Inc.

May 14, 2024

Page 3 of 9 ends

15985-03 NA

NOISE FUNDAMENTALS
Noise is simply defined as "unwanted sound." Sound becomes unwanted when it interferes with normal activities, when it causes actual physical harm or when it has adverse effects on health.

Noise is measured on a logarithmic scale of sound pressure level known as a decibel (dB). A- weighted decibels (dBA) approximate the subjective response of the human ear to broad frequency noise source by discriminating against very low and very high frequencies of the audible spectrum. They are adjusted to reflect only those frequencies which are audible to the human ear. Exhibit 2 presents a summary of the typical noise levels and their subjective loudness and effects that are described in more detail below.

Since the range of intensities that the human ear can detect is so large, the scale frequently used to measure intensity is a scale based on multiples of 10, the logarithmic scale. The scale for measuring intensity is the decibel scale. Each interval of 10 decibels indicates a sound energy ten times greater than before, which is perceived by the human ear as being roughly twice as loud. (1) The most common sounds vary between 40 dBA (very quiet) to 100 dBA (very loud). Normal conversation at three feet is roughly at 60 dBA, while loud jet flyover noises equate to 110 dBA at approximately 1,000 feet, which can cause serious discomfort. (2) Another important aspect of noise is the duration of the sound and the way it is described and distributed in time.

EXHIBIT 2: TYPICAL NOISE LEVELS

Attachment I.B
Agenda Page 91

Nicole Morse, T&B Planning, Inc.

May 14, 2024

Page 4 of 9 ends

15985-03 NA

RECEIVER LOCATIONS
To assess the potential for noise impacts, the following receiver locations, as shown on Exhibit 3, were identified as representative locations for analysis. Sensitive uses or receivers are generally defined as locations where people reside or where the presence of unwanted sound could otherwise adversely affect the use of the land. To describe the p otential off-site Project noise levels, four receiver locations in the vicinity of the Project site were identified, including the location of the nearest existing noise sensitive residential receiver (R2) located approximately 7 feet north of the Project site boundary.

The selection of receiver locations is based on FHWA guidelines and is consistent with additional guidance provided by Caltrans and the FTA. Other sensitive land uses in the Project study area that are located at greater distances than those identified in this noise study will experience lower noise levels than those presented in this report due to the additional attenuation from distance and the shielding of intervening structures.

NOISE PREDICTION MODEL
To fully describe the exterior operational noise levels from the Project, Urban Crossroads, Inc. developed a noise prediction model using the CadnaA (Computer Aided Noise Abatement) computer program. CadnaA can analyze multiple types of noise sources using the spatially accurate Project site plan, georeferenced Nearmap aerial imagery, topography, buildings, and barriers in its calculations to predict outdoor noise levels. Using the ISO 9613-2 protocol, CadnaA will calculate the distance from each noise source to the noise receiver locations, using the ground absorption, distance, and barrier/building attenuation inputs to provide a summary of noise level at each receiver and the partial noise level contributions by noise source. The noise level calculations provided in this noise assessment account for the distance attenuation provided due to geometric spreading, when sound from a localized stationary source (i.e., a point source) propagates uniformly outward in a spherical pattern. A default ground attenuation factor of 0.5 was used in the CadnaA noise analysis to account for mixed ground representing a combination of hard and soft surfaces.

OPERATIONAL NOISE ANALYSIS
This section analyzes the potential stationary-source operational noise impacts at the nearby receiver locations resulting from the operation of the proposed YMCA Downey Project. This operational noise analysis is intended to describe noise level impacts associated with the typical of daytime and nighttime activities at the Project site. The on-site Project-related noise sources are expected to include Pickleball, roof-top air conditioning units, and parking lot vehicle movements. No pickleball activities shall be permitted during the noise sensitive nighttime hours of 10:00 p.m. to 7:00 a.m.

Attachment I.B
Agenda Page 92

Nicole Morse, T&B Planning, Inc.

May 14, 2024

Page 5 of 9 ends

15985-03 NA
EXHIBIT 3: RECEIVER LOCATIONS

Attachment I.B
Agenda Page 93

Nicole Morse, T&B Planning, Inc.

May 14, 2024

Page 6 of 9 ends

15985-03 NA

OPERATIONAL NOISE STANDARDS
To analyze noise impacts originating from the YMCA Downey, operational source noise is evaluated against standards established under a City’s Municipal Code. For noise-sensitive residential property, the City of Downey Municipal Code, Chapter 6 Section 4606.3, identifies exterior noise levels standards of 55 dBA Leq for the daytime hours (7:00 a.m. to 10:00 p.m.) and 45 dBA Leq during the nighttime (10:00 p.m. to 7:00 a.m.) hours. The City of Downey Municipal Code Noise Standards are included in Appendix A.

OPERATIONAL NOISE SOURCES
To estimate the Project operational noise impacts, reference noise level measurements were collected from similar types of activities to represent the noise levels expected with the development of the proposed Project. While sound pressure levels (e.g., L eq) quantify in decibels the intensity of given sound sources at a reference distance, sound power levels (L w) are connected to the sound source and are independent of distance. Sound pressure levels vary substantially with distance from the source and diminish because of intervening obstacles and barriers, air absorption, wind, and other factors. Sound power is the acoustical energy emitted by the sound source and is an absolute value that is not affected by the environment. The reference project operational noise levels are based on the Project related noise source activities shown on Exhibit D. The reference project operational reference noise levels and sound power levels are summarized below on Table 1.

TABLE 1: REFERENCE NOISE LEVELS
Reference
Noise Source
Noise
Source
Height
(Feet)
Min./
Hour1
Reference
Noise Level
(dBA Leq)
@ 50 Feet
Sound
Power
Level
(dBA)2 Day Night
Pickleball Court Activity 5' 60 0 58.1 89.8
Roof-Top Air Conditioning Units 5' 39 28 47.4 79.0
Parking Lot Vehicle Movements 3' 60 30 52.6 81.1
1 Anticipated duration (minutes within the hour) of noise activity during typical hourly conditions expected at the Project site. "Daytime" = 7:00 a.m. - 10:00 p.m.; "Nighttime" = 10:00 p.m. - 7:00 a.m. 2 Sound power level represents the total amount of acoustical energy (noise level) produced by a sound source independent of distance or surroundings. Sound power levels calculated using the CadnaA noise model at the reference distance to the noise source. Numbers may vary due to size differences between point and area noise sources.

OPERATIONAL NOISE LEVEL COMPLIANCE
Using the reference noise levels to represent the proposed Project operations that include Pickleball, roof-top air conditioning units, and parking lot vehicle movements, Urban Crossroads, Inc. calculated the operational source noise levels that are expected to be generated at the Project site. Table 2 shows the unmitigated Project operational noise levels during the daytime hours of 7:00 a.m. to 10:00 p.m. The daytime hourly noise levels at the off-site receiver locations are expected to range from 41.3 to 47.8 dBA Leq. The nighttime hourly noise levels at the off-site receiver locations are expected to range from 38.3 to 43.0 dBA Leq. The differences between the Attachment I.B
Agenda Page 94

Nicole Morse, T&B Planning, Inc.

May 14, 2024

Page 7 of 9 ends

15985-03 NA
daytime and nighttime noise levels are largely related to the estimated duration of noise activity with no nighttime pickleball activities as outlined in Table 1 and Appendix B.

EXHIBIT 4: OPERATIONAL NOISE SOURCE LOCATIONS

Attachment I.B
Agenda Page 95

Nicole Morse, T&B Planning, Inc.

May 14, 2024

Page 8 of 9 ends

15985-03 NA
TABLE 2: OPERATIONAL NOISE LEVEL COMPLIANCE
Receiver
Location1
Project Operational
Noise Levels (dBA Leq)2
Noise Level Standards
(dBA Leq)3
Noise Level Standards
Exceeded?4
Daytime Nighttime Daytime Nighttime Daytime Nighttime
R1 41.3 38.3 55 45 No No
R2 46.7 43.0 55 45 No No
R3 46.0 38.4 55 45 No No
R4 47.8 41.0 55 45 No No
1 See Exhibit C for the receiver locations.
2 Project operational noise calculations are included in Appendix B. 3 City of Downey Municipal Code Section 4606.3 Exterior noise level standards. 4 Do the estimated Project operational noise source activities exceed the noise level standards? 5 Project operational noise levels provided for informational purposes "Daytime" = 7:00 a.m. - 10:00 p.m.; "Nighttime" = 10:00 p.m. - 7:00 a.m.

Table 2 shows that the unmitigated operational noise levels associated with YMCA Downey Project will not exceed the City of Downey exterior noise level standards.

CONSTRUCTION NOISE ANALYSIS
This section analyzes potential impacts resulting from the short-term construction activities associated with the development of the Project. According to the City’s Municipal Code Section 4606.5, noise sources associated with construction, repair or remodeling equipment and devices and other related construction noise sources shall be exempted from the provisions of this chapter provided a valid permit for such construction, repair, or remodeling shall have been obtained from the City. In any circumstance other than emergency work, no repair or remodeling shall take place between the hours of 9:00 p.m. of one day and 7:00 a.m. of the following day, and no repair or remodeling shall exceed 85 dBA Lmax across any property boundary at any time during the course of a 24-hour day.

To describe construction noise activities, this construction noise analysis was prepared using reference construction equipment noise levels from the Federal Highway Administration (FHWA) published the Roadway Construction Noise (4 p. 179) Model (RCNM), which includes a national database of construction equipment reference noise emission levels. (3) Using a composite construction equipment reference noise level of 90.0 dBA Lmax at 50 feet to describe Project grading activities, calculations of the Project construction noise level impacts at the nearby sensitive receiver locations were completed using the CadnaA noise prediction model. As shown on Table 3, the highest construction noise levels are expected to range from 74.2 to 78.8 dBA Lmax at the nearby receiver locations. Appendix C includes the detailed CadnaA construction noise model inputs. The construction noise analysis shows that the nearest receiver locations will not exceed the 85 dBA Lmax significance threshold during Project construction activities as shown on Table 3. Therefore, the noise impacts due to Project construction noise are considered less than significant at all receiver locations.

Attachment I.B
Agenda Page 96

Nicole Morse, T&B Planning, Inc.

May 14, 2024

Page 9 of 9 ends

15985-03 NA
TABLE 3: CONSTRUCTION NOISE LEVEL COMPLIANCE
Receiver
Location1
Construction Noise Levels (dBA Lmax)
Highest Construction
Noise Levels2 Threshold3 Threshold
Exceeded?4
R1 77.3 85 No
R2 78.8 85 No
R3 74.2 85 No
R4 77.8 85 No
1 Receiver locations are shown on Exhibit C.
2 Construction noise level calculations included in Appendix C. 3 City of Downey Municipal Code Section 4606.5
4 Do the estimated Project construction noise levels exceed the construction noise level threshold?

CONCLUSIONS
This Noise Assessment demonstrates that the noise levels associated with YMCA Downey Project will not exceed the established noise standards at the nearest residential receiver locations.

Therefore, the project related noise impacts are considered less than significant at the nearby noise-sensitive receiver locations. If you have any questions, please contact me directly at (949) 584-3148.

REFERENCES

1. California Department of Transportation Environmental Program. Technical Noise Supplement - A Technical Supplement to the Traffic Noise Analysis Protocol. Sacramento, CA : s.n., September 2013.

2. Environmental Protection Agency Office of Noise Abatement and Control. Information on Levels of Environmental Noise Requisite to Protect Public Health and Welfare with an Adequate Margin of Safety. March 1974. EPA/ONAC 550/9/74-004.

3. U.S. Department of Transportation, Federal Highway Administration, Office of Environment and Planning. FHWA Roadway Construction Noise Model. January, 2006.

Attachment I.B
Agenda Page 97

15985-03 NA

Attachment I.B
Agenda Page 98

15985-03 NA

ATTACHMENT A
CITY OF DOWNEY MUNICIPAL CODE CHAPTER 6
Attachment I.B
Agenda Page 99

15985-03 NA

Attachment I.B
Agenda Page 100

CHAPTER 6

UNNECESSARY NOISES
§ 4600. NOISES.

No person within the City shall make, continue, or cause to be made or continued any loud, unnecessary, or unusual noise; nor shall any person race the motor of any motor vehicle, needlessly bring to a sudden start or stop any motor vehicle, or operate any motor vehicle (including any motorcycle, trail bike, dune buggy, motor scooter, or jeep) or the motor thereof on any place other than a highway so as to disturb the peace or quiet of any neighborhood or person by noise, dust, smoke, or fumes caused by such motor vehicle; nor shall any person make any noise which either annoys, disturbs, injures, or endangers the comfort, repose, health, peace, or safety of others. (Added by Ord. 214, adopted 12-10-62 ; amended by Ord. 390, adopted 2-8-71 ) § 4600.1. NOISES: PRIMA FACIE VIOLATIONS.

Any noise in excess of 100 decibels at a point 25 feet or more from the source of the noise shall be deemed to be a prima facie violation of the provisions of Section 4600 of this chapter.
(Added by Ord. 390, adopted 2-8-71 )
§ 4600.2. NOISES: EQUIPMENT AND MACHINERY.
(Added by Ord. 323, adopted 12-12-66 ; renumbered by Ord. 393, adopted 4-12-71 ; amended by Ord. 508, adopted 6-22-76 ; Ord. 08-1225, adopted 2-12-08 ) § 4600.3. NOISES: MOTOR VEHICLES.

It shall be unlawful for any person within any residential area of the City of within 100 feet of any residentially zoned property, to repair, rebuild, or test any motor vehicle or operate or run the engine thereof in any manner to produce sounds which would disturb or interfere with the peace, comfort, or welfare of the neighboring inhabitants.

For purposes of this section, the term "motor vehicles" shall include, but not be limited to, automobiles, trucks, recreation vehicles, off-road vehicles, mini-bikes, and go-carts. (Added by Ord. 778, adopted 12-18-84 )
(a) No person shall use, operate, or permit to be used or operated within any R-1, R-2, or R-3 Zone, as defined in Chapter 1 of Article IX of this code, any power tool, machine, or equipment, or any other tool, machine, or equipment, between the hours of 10:00 p.m. and 7:00 a.m. in such a manner that the noise therefrom disturbs or interferes with the peace, comfort, or welfare of the neighboring inhabitants. (b) No person shall use, operate, or permit to be used or operated within any commercial (C) or manufacturing (M) Zone, as defined in Chapter 1 of Article IX of this code, which is within 300 feet of a residential use, any power tool, machine, or equipment, or any other tool, machine, or equipment, between the hours of 10:00 p.m. and 7:00 a.m. in such a manner that the noise therefrom disturbs or interferes with the peace, comfort, or welfare of the neighboring residential inhabitants.

City of Downey, CA
§ 4600 § 4601
Downloaded from https://ecode360.com/DO4924 on 2024-05-03 Attachment I.B
Agenda Page 101

§ 4601. POLICE DEPARTMENT SECOND RESPONSE.
(Added by Ord. 967, adopted 8-24-93 )
§ 4602. RADIOS, PHONOGRAPHS, AND THE LIKE.

No person shall use or operate, or permit to be played, used, or operated, when under his control or direction, any radio, receiving set, musical instrument, phonograph, or other machine or device for the producing or reproducing of sound in such a manner (a) Legislative findings and authorization. The City Council hereby finds that there exists and has existed an increasing trend toward large parties and gatherings both at rental facilities and private homes within the City of Downey. Said parties, on many occasions, disturb the public peace, safety, and welfare thereby requiring police services over and above those normally provided. Therefore, the Council hereby further finds that it is in the best interest of the City as well as in fairness to its citizens to require those persons utilizing the additional police services to defray the City's expense for providing the same.
(b) Second response – Fee. When a party or gathering occurs at a premises and a police officer at the scene determines that there is a threat to the public peace, health, safety or general welfare, the person in charge of the premises and the person responsible for the event, or if either of those persons is a minor, then the parents or guardians of that minor, will be held jointly and severally liable for the cost of providing police personnel on special security assignment over and above the services normally provided by the department. The police personnel utilized during a second response within 12 hours after the first warning, to control the threat to the public peace, health, safety or general welfare, shall be deemed to be on special security assignment over and above the services normally provided. The costs of such special security assignment includes all personnel costs as well as damages to City property and/or injuries to City personnel. The City reserves the right to elect any other legal remedies available to it in connection with the matter. (c) Accounting and billing procedures. Any and all personnel who may be deployed the City pursuant to this section shall be deemed to be on regular duty under the general supervision of the Chief of Police or the Chief of the Fire Department, and any officer in charge under their respective commands, and shall be entitled to any and all benefits provided by law or ordinance for such personnel as employees of the City, except that the rate of pay for such special security services shall be as set forth herein. The pay for each employee thus employed during such employment shall be at his or her actual rate of pay. The Chief of Police, or other department head, as the case may be, shall report to the Director of Finance the name of the person, firm, organization or corporation requiring such personnel, the names of the employees so employed and the number of hours of employment of each. The Director of Finance shall thereupon bill the person, firm, or corporation employing such personnel for the amount paid to each plus the cost of workers' compensation charges and other administrative costs. The minimum service fee shall be $50. Any failure of the person, firm or corporation billed for services of such personnel to make payment therefor shall constitute a debt due solely to the City.

City of Downey, CA
§ 4601 § 4602
Downloaded from https://ecode360.com/DO4924 on 2024-05-03 Attachment I.B
Agenda Page 102

as to disturb the peace, quiet, and comfort of the neighboring inhabitants or at any time with louder volume than is necessary for convenient hearing for the persons who are in the room, vehicle, or chamber in which such machine or device is operated and who are voluntary listeners thereto. No person shall use or operate, or permit to be used, operated, or played, while under his control any radio, receiving set, musical instrument, phonograph, or other machine or device for the producing or reproducing of sound between the hours of 10:00 p.m. and 7:00 a.m. in such a manner that the sound therefrom is plainly audible at a distance of 50 feet from the building, structure, or vehicle in which it is located.
(Added by Ord. 96, adopted 5-26-58 ; amended by Ord. 508, adopted 6-22-76 ) § 4603. LOUDSPEAKERS AND AMPLIFIERS FOR ADVERTISING.

No person shall use or operate, or permit to be played, used, or operated, while under his/her control, any radio, receiving set, musical instrument, phonograph, loudspeaker, sound amplifier, or other machine or device for the producing or reproducing of sound which is cast upon the public streets.
(Added by Ord. 96, adopted 5-26-58 ; amended by Ord. 1098, adopted 4-24-01 ) § 4604. OUTDOOR PAGING SYSTEMS.
(a) For the purposes of this section, "outdoor paging system" shall mean any sound amplifying system used in connection with any place of business for which a business license if required and used for the purpose of calling, paging, or communicating with any person outside of any building or enclosure. (b) No person shall install, maintain, or operate any outdoor paging system without a permit therefor first having been issued by the City in accordance with rules and procedures as promulgated by the City Manager.
(c) No permit shall be issued for an outdoor paging system which is capable of producing a sound level of five decibels "A" scale db(A) above the ambient sound level at the property line of adjacent property.

No speaker having a rated output in excess of that allowed by the permit shall be installed or used, and in no case shall the sound amplifying equipment be operated with an excess of 15 watts of power in the last stage of amplification. (d) No outdoor paging system shall be operated between the hours of 9:30 p.m. and 8:00 a.m. of the next succeeding day if the sound therefrom is audible upon residential property.
(e) No outdoor paging system shall be used in such a manner as to create a sound upon any residential property at any time, which sound is of such tone or volume as to be annoying or disturbing to persons of normal sensibility upon any residential property.
(f) Any permit issued pursuant to the provisions of this section may be revoked by the appropriate City department or office as set forth in the rules and procedures City of Downey, CA
§ 4602 § 4604
Downloaded from https://ecode360.com/DO4924 on 2024-05-03 Attachment I.B
Agenda Page 103

(Added by Ord. 423, adopted 7-25-72 )
§ 4605. ANIMALS, BIRDS, AND FOWL.

No person shall keep, maintain, or permit upon any lot or parcel of land under his control any dog, animal, or fowl which by any sound, bark, or cry disturbs the peace or comfort of the neighboring inhabitants or interferes with any person for the reasonable and comfortable enjoyment of life and property.
(Added by Ord. 96, adopted 5-26-58 ; renumbered by Ord. 423, adopted 7-25-72 ) § 4606. NOISE REGULATIONS.
(Added by Ord. 508, adopted 6-22-76 )
§ 4606.1. DECLARATION OF POLICY.

The Council finds and declares that noise is a major source of environmental pollution which represents a threat to the serenity and quality of life in the City. Excess noise often has an adverse physiological and psychological effect on human beings, thus contributing an economic and social loss to the community. Accordingly, it is the policy of the Council to establish standards for noise level limits for the various time periods and areas within the City. Noise in excess of the limits provided in this chapter shall constitute a public nuisance.
(Added by Ord. 508, adopted 6-22-76 )
§ 4606.2. DEFINITIONS.

As used in this chapter, unless the context otherwise clearly indicates, the following words and phrases are defined to mean and include:
"A-Weighted Sound Level." The total sound level in decibels of all sound as measured with a sound level meter with a reference pressure of 20 microPascals per square meter using the A-weighted network (scale at slow response). The unit of measurement shall be defined as db(A).
"Ambient Noise." The all-encompassing noise associated with a given environment, providing for the issuance of such permit upon the satisfactory showing that such outdoor paging system is being used and operated in violation of the provisions of any law or is being used in such a manner as to constitute a nuisance, public or private. Such revocation shall be by delivering a notice of revocation, with the reasons therefor, to the person applying for the permit in person or by mailing such notice to the address of the applicant as set forth in his application. Such revocation shall be effective within five days following the date of delivery or the date of mailing, unless within such period of time the applicant files with the City Manager a demand for a hearing.

If such a demand for a hearing is filed, the City Manager shall set the matter for a hearing before him and, at the conclusion of such hearing, shall make his determination as to whether there was good cause for the revocation, and the decision of the City Manager shall be final.

City of Downey, CA
§ 4604 § 4606.2
Downloaded from https://ecode360.com/DO4924 on 2024-05-03 Attachment I.B
Agenda Page 104

being usually a composite of sounds from many sources near and far. "Commercial Land Use." A parcel of real property which is developed and used, either in part or in whole, for commercial purposes.
"Cyclically Varying Noise." A steady or nonsteady noise which varies in amplitude, while the same sound pressure level is obtained at reasonable uniform intervals of time. "Decibel." A unit which denotes the ratio between two quantities which are proportional to power; the number of decibels corresponding to the ratio of two amounts of power is 10 times the logarithm to the base 10 of this ratio.
"Impulsive Noise." A noise that is repeated at sufficiently slow rates such that a sound level meter set at "fast" meter response will show changes in sound pressure level greater than 100 db(A).
"Manufacturing Land Use." A parcel of real property which is developed and used, either in part or in whole, for manufacturing purposes.
"Noise Level." The maximum continuous sound level or repetitive peak level produced by a source or group of sources, as measured with a precision sound level meter, using the A-weighting scale, and with the meter response function set at "slow". "Person." An individual, firm, association, co-partnership, joint venture, corporation, or any entity, public or private in nature.
"Property Boundary." An imaginary line at the ground surface, and its vertical extension, which separates the real property owned or leased by one person from that owned or leased by another person. This shall include multiple units, with the property boundary being the wall separating the adjoining units.
"Pure Tone." A sound wave whose instantaneous pressure varies essentially as a simple sinusoidal function of time.
"Residential Land Use." A parcel of real property which is developed and used, either in part or in whole, for residential purposes, other than transient uses, such as hotels and motels.
"Sound Level Meter." An instrument meeting the American National Standard Institute's Standard S1. 4-1971 or most recent revision thereof for Type 1 or Type 2 sound level meters or an instrument and the associated recording and analyzing equipment which will provide equivalent data.
"Sound Pressure Level." A sound, in decibels, shall mean 20 times the logarithm to the base 10 of the ratio of the pressure of the sound to a reference pressure, which reference pressure shall be explicitly stated.
"Steady Noise." A noise whose sound pressure level remains within a +6 db range during the 15 minute measurement period, with the sound level meter set at "slow" response. (Added by Ord. 508, adopted 6-22-76 )
§ 4606.3. MAXIMUM PERMISSIBLE NOISE LEVELS BY SOUND SOURCES ACROSS PROPERTY BOUNDARIES.

City of Downey, CA
§ 4606.2 § 4606.3
Downloaded from https://ecode360.com/DO4924 on 2024-05-03 Attachment I.B
Agenda Page 105

(Added by Ord. 508, adopted 6-22-76 ; amended by Ord. 551, adopted 7-25-78 ) § 4606.4. EXEMPTIONS.

The standards established in this chapter shall not apply to any of the following noise sources:
(a) All activities to which this chapter is applicable shall be conducted in such a manner that any noise produced shall not create a disturbance. The maximum permissible sound pressure level measured at the property boundary of any land use in Subsection (b) of this section from any noise source not operating on a public right- of-way shall constitute prima facie evidence of a public nuisance when such noise level exceeds five db(A) above the ambient noise level at any period during the course of a 24 hour day.
(b) If the alleged noise source is of a continuous nature and cannot reasonably be discontinued for a time period wherein the ambient noise level can be determined, the maximum permissible steady noise level by sound sources across the property boundary of any land use cited below may be less, but not greater than:

Land Use 7:00 a.m. to 10:00 p.m. 10:00 p.m. to 7:00 a.m.

Residential 55 db(A)45 db(A)
Commercial 65 db(A)65 db(A)
Manufacturing 70 db(A)70 db(A)
(c) If any parcel of real property is developed and used for multiple land uses, the lower land use noise level standard shall apply.
(d) In the hours between 7:00 a.m. to 10:00 p.m., the noise levels permitted in Subsection (b) of this section may be adjusted by the inclusion of the following factors when applicable:
(1) Noise source operated 12 minutes per hour or less + 5 db(A) (2) Noise source operated three minutes per hour or less + 10 db(A) (3) Noise source operated one minute per hour or less + 15 db(A) (e) Impulsive sounds, pure tone, or sounds with a cyclically varying amplitude shall be considered a public nuisance when such noises are at a sound pressure level of five db(A) less than those listed in subsection (b) of this section, with the inclusion of the corrective factors listed in subsection (d) of this section, when applicable. (a) Any activity to the extent preempted from regulation by State or Federal law; (b) Bells, chimes, or carillons while being used in conjunction with religious services; (c) Emergency energy release devices;
(d) Emergency work authorized by the City;
City of Downey, CA
§ 4606.3 § 4606.4
Downloaded from https://ecode360.com/DO4924 on 2024-05-03 Attachment I.B
Agenda Page 106

(Added by Ord. 508, adopted 6-22-76 )
§ 4606.5. CONSTRUCTION PROJECTS.

Construction, repair or remodeling equipment and devices and other related construction noise sources shall be exempted from the provisions of this chapter provided a valid permit for such construction, repair, or remodeling shall have been obtained from the City. In any circumstance other than emergency work, no repair or remodeling shall take place between the hours of 9:00 p.m. of one day and 7:00 a.m. of the following day, and no repair or remodeling shall exceed 85 db(A) across any property boundary at any time during the course of a 24-hour day.
(Added by Ord. 508, adopted 6-22-76 )
§ 4606.6. NOISE MEASUREMENT PROCEDURES.

The following procedures shall be used for measuring and evaluating noise in the community, unless otherwise specified in this chapter:
(e) Special events authorized by the City;
(f) The unamplified human voice; and
(g) Warning systems used to protect the public health, safety, or welfare. (a) The location of the microphone of the measurement system shall be on the receptor's property boundary at a point approximately 10 feet from any obstruction (building walls, trees, bushes, automobiles) for the measurement of exterior noise.

In the event such locational criteria cannot be achieved, a location other than the property boundary may be selected provided it permits conformance with the provisions stated herein.
(b) The measurement of interior noise shall be in a central location of the receptor's room or space.
(c) No person, other than the operator, shall be within 10 feet of the microphone used with the sound measurement system during the measurement period. (d) The sound measurement system shall be calibrated in accordance with the manufacturer's instructions. An acoustic calibrator or pistonphone with a pure tone of 1,000 hertz shall be used to calibrate the sound measurement system prior to, and immediately after, the measurement program. The calibration instrument shall be certified as having been calibrated within the previous 365 days of the measurement date.
(e) Prior to conducting a noise measurement, the City will prepare a noise measurement data sheet comprising the following information:
(1) The name of the property owner where the measurement is being conducted; (2) The location of the alleged noise source and the address of its owner; (3) A description of the noise source and the nature of the alleged violation; City of Downey, CA
§ 4606.4 § 4606.6
Downloaded from https://ecode360.com/DO4924 on 2024-05-03 Attachment I.B
Agenda Page 107

(4) The name of the operator conducting the measurement; (5) A diagram of microphone placement on the subject site; (6) The date, time, and duration of the measurement;
(7) The calibration value at the start and completion of the measurement (two calibrations);
(8) The temperature and relative humidity;
(9) The wind direction and estimated velocity; and
(10) A list of all equipment used for the survey, including the name, model, serial number, and calibration date of each piece of equipment. (f) During the execution of the noise measurement program, the City shall abide by the following procedures;
(1) The equipment shall comply with the provisions of this section. (2) The calibration of the equipment shall comply with the provisions of this section.
(3) All measurements shall be conducted with the sound level meter set on the A- weighted scale "fast" response reading level.
(4) A series of 360 events shall be taken. Each event shall be no less than and no more than one second, with each interval between events not to exceed 10 seconds. The minimum measurement period shall be 15 minutes. (5) A series of ambient noise level measurements shall be taken when the alleged noise source is not in operation in accordance with the procedure outlined in subsection (4) of this subsection.
(6) A series of measurements shall be taken when the alleged noise source is operating in accordance with the procedure outlined in subsection (4) of this subsection.
(7) The difference between the averages in subsections (5) and (6) of this subsection shall be recorded on the data sheet.
(8) If the alleged noise source is found to exceed the average identified in subsection (5) of this subsection by five A-weighted decibel units, the alleged noise source shall be found in violation of the provisions of this chapter. (9) If the alleged noise source cannot be turned off for the purpose of making a measurement as prescribed in subsection (5) of this subsection under the provisions of subsection (6) of this subsection shall be compared with the standards in subsection (b) of Section 4606.3 of this chapter. (10) If the measured value in subsection (6) of this subsection is one A-weighted City of Downey, CA
§ 4606.6 § 4606.6
Downloaded from https://ecode360.com/DO4924 on 2024-05-03 Attachment I.B
Agenda Page 108

(Added by Ord. 508, adopted 6-22-76 ; amended by Ord. 551, adopted 7-25-78 ) § 4606.7. VARIANCE PROCEDURES.

The owner or operator of a noise source which violates any of the provisions of this chapter may file an application with the Director of Community Development for a variance from the provisions thereof wherein such owner or operator shall set forth all actions taken to comply with such provisions, the reasons why immediate compliance cannot be achieved, a proposed method of achieving compliance, and a proposed time schedule for its accomplishment. The application shall be accompanied by a fee of $50. A separate application shall be filed for each noise source; provided, however, several mobile sources under a common ownership, or several fixed sources on a single property, may be combined into one application. Upon the receipt of such application and fee, the Director of Community Development shall refer it, with his recommendations thereon, within 30 days to the Board of Fire and Building Appeals for action thereon in accordance with the provisions of this chapter.

An applicant for a variance shall remain subject to prosecution under the terms of this chapter until a variance is granted.

The Board of Fire and Building Appeals shall evaluate all applications for variances from the requirements of this chapter and may grant such variances with respect to time for compliance, subject to such terms, conditions, and requirements as it may deem reasonable to achieve maximum compliance with the provisions of this chapter.

Such terms, conditions, and requirements may include, but shall not be confined to, limitations on noise levels and operating hours. Each such variance shall set forth in detail the approved method of achieving maximum compliance and a time schedule for its accomplishment. In its determinations, the Board shall consider the following:
decibel greater than in subsection (5) of this subsection (as adjusted for day or night measurements), the source shall be found in violation of this chapter. (11) The noise level created by equipment, such as air-conditioning, refrigeration, heating, pumping, and filtering, installed prior to the effective date of the noise ordinance enacting this chapter may exceed the presumed ambient noise levels but in no event by more than eight dBA for a period not exceeding five years from June 22, 1976 (said effective date of this subsection). (12) In the event any complainant requests that a noise measurement test be performed for any claimed violation of this chapter and for which claimed violation a noise measurement test has been performed within six months previous to the request and found to not be in violation, such complainant shall deposit with the City the amount of $100. If the noise source is found not to be in violation of this chapter, the costs of the noise measurement test will be deducted and the balance returned to the complainant. If the noise source is in violation under this chapter, the entire deposit will be returned. Such deposit shall be non-interest bearing.
(a) The magnitude of nuisance caused by the offensive noise; City of Downey, CA
§ 4606.6 § 4606.7
Downloaded from https://ecode360.com/DO4924 on 2024-05-03 Attachment I.B
Agenda Page 109

(Added by Ord. 508, adopted 6-22-76 )
§ 4606.8. APPEALS.

Within 15 calendar days following the decision of the Building Appeals Board on an application, the applicant or any other interested person may appeal the decision through the Council by filing a notice of appeal with the City Clerk. In the case of an appeal for a variance, the notice of appeal shall be accompanied by a fee of $50. The City Clerk shall transmit one copy of the notice of appeal to the Director of Community Development. The Director shall forward to the Council one copy of the application for the variance, the staff reports, the recommendation of the Building Appeals Board, the notice of appeal, and all evidence with the application received by the Board. In addition, any person may file with the Council written arguments supporting or attacking the decision of the Board and the Council, at its discretion, may hear oral arguments thereon.

The hearing shall be held not less than 10 calendar days, and not more than 40 calendar days, after the time of filing the appeal. The City Clerk shall mail to the applicant a notice of the date set for the hearing at least 10 calendar days prior to the hearing date.

Within 60 calendar days following its receipt of the notice of appeal, the Council shall either affirm, modify, or reverse the decision of the Building Appeals Board. Such decision shall be based on the Council's evaluation of the matters submitted to the Council and the factors to be considered as enumerated in Section 4606.7 of this chapter.

As part of its decision, the Council may direct the Board to conduct further proceedings on the application. Failure of the Council to affirm, modify or reverse the decision of the Building Appeals Board within such 60-day period shall constitute affirmation of the Board's decision.
(Added by Ord. 508, adopted 6-22-76 )
§ 4606.9. VIOLATIONS: ADDITIONAL REMEDIES: INJUNCTIONS.

As an additional remedy, any violation of Sections 4606.3 and 4606.5 of this chapter shall be deemed and is declared to be a nuisance and may be subject to abatement summarily by a restraining order or injunction issued by a court of competent jurisdiction.
(Added by Ord. 508, adopted 6-22-76 )
(b) The uses of property within the area of impingement by the noise; (c) The time factors related to the study, design, financing, and construction of the remedial work;
(d) The economic factors related to the age and useful life of the equipment; and (e) The general public interest, welfare, and safety.

Any variance granted by the Board shall be transmitted to the Director of Community Development for administration. Any violation of the terms of such variance shall be unlawful.

City of Downey, CA
§ 4606.7 § 4606.10
Downloaded from https://ecode360.com/DO4924 on 2024-05-03 Attachment I.B
Agenda Page 110

§ 4606.10. MANNER OF ENFORCEMENT.

Violations of this chapter shall be prosecuted in the same manner as other misdemeanor violations of this Code, provided, however, in the event of violations of Sections 4606.3 and 4606.5 of this chapter, a written notice of intention to prosecute will be given to the alleged violator not less than 15 calendar days prior to the issuance of a misdemeanor complaint. No complaint shall be issued in the event the cause of the violation is removed or the condition is abated or fully corrected within such 15 day period. In the event the alleged violator cannot be located in order to serve the notice of intention to prosecute, the notice as required herein shall be deemed to be given upon mailing such notice by registered or certified mail to the alleged violator at his last known address or at the place where the violation occurred, in which event the 15 day period shall commence at the date of the day following the mailing of such notice. In the event of any conflict between the provisions of this chapter, the most restrictive shall be applicable. (Added by Ord. 508, eff. 6-22-76 )
City of Downey, CA
§ 4606.10 § 4606.10
Downloaded from https://ecode360.com/DO4924 on 2024-05-03 Attachment I.B
Agenda Page 111

15985-03 NA

Attachment I.B
Agenda Page 112

15985-03 NA

ATTACHMENT B

OPERATIONAL NOISE MODEL CALCULATIONS

Attachment I.B
Agenda Page 113

15985-03 NA

Attachment I.B
Agenda Page 114

15985 - YMCA Downey
CadnaA Noise Prediction Model: 15985-02.cna
Date: 03.05.24
Analyst: B. Lawson
Calculation Configuration
Configuration
Parameter Value
General
Max. Error (dB)0.00
Max. Search Radius (#(Unit,LEN))2000.01
Min. Dist Src to Rcvr 0.00
Partition
Raster Factor 0.50
Max. Length of Section (#(Unit,LEN))999.99
Min. Length of Section (#(Unit,LEN))1.01
Min. Length of Section (%)0.00
Proj. Line Sources On
Proj. Area Sources On
Ref. Time
Daytime Penalty (dB)0.00
Recr. Time Penalty (dB)5.00
Night-time Penalty (dB)10.00
DTM
Standard Height (m)0.00
Model of Terrain Triangulation
Reflection
max. Order of Reflection 2
Search Radius Src 100.00
Search Radius Rcvr 100.00
Max. Distance Source - Rcvr 1000.00 1000.00
Min. Distance Rvcr - Reflector 1.00 1.00
Min. Distance Source - Reflector 0.10
Industrial (ISO 9613)
Lateral Diffraction some Obj
Obst. within Area Src do not shield On
Screening Incl. Ground Att. over Barrier
Dz with limit (20/25)
Barrier Coefficients C1,2,3 3.0 20.0 0.0
Temperature (#(Unit,TEMP))10
rel. Humidity (%)70
Ground Absorption G 0.50
Wind Speed for Dir. (#(Unit,SPEED))3.0
Roads (TNM)
Railways (FTA/FRA)
Aircraft (???)
Strictly acc. to AzB
Receiver Noise Levels
Name M.ID Level Lr Limit. Value Land Use Height Coordinates Day Night CNEL Day Night CNEL Type Auto Noise Type X Y Z (dBA)(dBA)(dBA)(dBA)(dBA)(dBA)(ft)(ft)(ft)(ft)
RECEIVERS R1 41.3 38.2 45.0 50.0 45.0 0.0 5.00 a 6520357.20 1799516.38 5.00 RECEIVERS R2 46.7 43.0 49.9 50.0 45.0 0.0 5.00 a 6520521.45 1799600.39 5.00 RECEIVERS R3 46.0 38.4 46.6 50.0 45.0 0.0 5.00 a 6520670.20 1799349.72 5.00 RECEIVERS R4 47.8 41.0 48.9 50.0 45.0 0.0 5.00 a 6520425.43 1799268.26 5.00 Point Source(s)
Name M.ID Result. PWL Lw / Li Operating Time Height Coordinates Day Evening Night Type Value norm.Day Special Night X Y Z (dBA)(dBA)(dBA)dB(A)(min)(min)(min)(ft)(ft)(ft)(ft)
POINTSOURCE AC01 79.0 79.0 79.0 Lw 79 500 585.00 0.00 252.00 5.00 g 6520465.23 1799487.56 31.00 POINTSOURCE AC02 79.0 79.0 79.0 Lw 79 500 585.00 0.00 252.00 5.00 g 6520436.33 1799444.01 31.00 POINTSOURCE AC03 79.0 79.0 79.0 Lw 79 500 585.00 0.00 252.00 5.00 g 6520379.33 1799486.77 31.00 POINTSOURCE AC04 79.0 79.0 79.0 Lw 79 500 585.00 0.00 252.00 5.00 g 6520415.35 1799543.77 31.00 POINTSOURCE AC07 79.0 79.0 79.0 Lw 79 500 585.00 0.00 252.00 5.00 g 6520511.94 1799449.16 31.00 POINTSOURCE AC08 79.0 79.0 79.0 Lw 79 500 585.00 0.00 252.00 5.00 g 6520580.83 1799405.22 31.00 POINTSOURCE AC09 79.0 79.0 79.0 Lw 79 500 585.00 0.00 252.00 5.00 g 6520666.33 1799560.00 31.00 POINTSOURCE AC10 79.0 79.0 79.0 Lw 79 500 585.00 0.00 252.00 5.00 g 6520610.91 1799592.86 31.00 POINTSOURCE P1 89.8 89.8 89.8 Lw 89.8 500 900.00 0.00 0.00 5.00 a 6520519.86 1799415.51 5.00 POINTSOURCE P2 89.8 89.8 89.8 Lw 89.8 500 900.00 0.00 0.00 5.00 a 6520514.32 1799406.80 5.00 POINTSOURCE P3 89.8 89.8 89.8 Lw 89.8 500 900.00 0.00 0.00 5.00 a 6520557.07 1799393.74 5.00 POINTSOURCE P4 89.8 89.8 89.8 Lw 89.8 500 900.00 0.00 0.00 5.00 a 6520551.93 1799384.24 5.00 Area Source(s)
Urban Crossroads, Inc.

Attachment I.B
Agenda Page 115

Name M.ID Result. PWL Result. PWL''Lw / Li Operating Time Height Day Evening Night Day Evening Night Type Value norm.Day Special Night (ft) (dBA)(dBA)(dBA)(dBA)(dBA)(dBA)dB(A)(min)(min)(min)
AREASOURCE CAR01 81.1 81.1 81.1 58.4 58.4 58.4 Lw 81.1 900.00 0.00 270.00 3 a AREASOURCE CAR02 81.1 81.1 81.1 58.9 58.9 58.9 Lw 81.1 900.00 0.00 270.00 3 a AREASOURCE CAR03 81.1 81.1 81.1 60.8 60.8 60.8 Lw 81.1 900.00 0.00 270.00 3 a AREASOURCE CAR04 81.1 81.1 81.1 59.5 59.5 59.5 Lw 81.1 900.00 0.00 270.00 3 a AREASOURCE CAR05 81.1 81.1 81.1 59.0 59.0 59.0 Lw 81.1 900.00 0.00 270.00 3 a AREASOURCE CAR06 81.1 81.1 81.1 55.8 55.8 55.8 Lw 81.1 900.00 0.00 270.00 3 a AREASOURCE CAR07 81.1 81.1 81.1 60.5 60.5 60.5 Lw 81.1 900.00 0.00 270.00 3 a AREASOURCE CAR08 81.1 81.1 81.1 54.3 54.3 54.3 Lw 81.1 900.00 0.00 270.00 3 a Name ID Height Coordinates
Begin End x y z Ground
(ft)(ft)(ft)(ft)(ft)(ft)
AREASOURCE CAR01 3.00 a 6520449.79 1799627.30 3.00 0.00 6520529.76 1799578.61 3.00 0.00
6520520.26 1799560.00 3.00 0.00
6520438.71 1799608.30 3.00 0.00
AREASOURCE CAR02 3.00 a 6520426.44 1799586.92 3.00 0.00 6520505.21 1799537.83 3.00 0.00
6520496.11 1799521.60 3.00 0.00
6520415.75 1799570.30 3.00 0.00
AREASOURCE CAR03 3.00 a 6520490.96 1799401.26 3.00 0.00 6520540.05 1799371.17 3.00 0.00
6520529.76 1799353.76 3.00 0.00
6520481.07 1799383.84 3.00 0.00
AREASOURCE CAR04 3.00 a 6520359.53 1799474.50 3.00 0.00 6520428.82 1799437.63 3.00 0.00
6520432.77 1799410.76 3.00 0.00
6520364.29 1799451.54 3.00 0.00
AREASOURCE CAR05 3.00 a 6520347.66 1799461.04 3.00 0.00 6520364.29 1799451.54 3.00 0.00
6520319.16 1799373.95 3.00 0.00
6520302.53 1799386.22 3.00 0.00
AREASOURCE CAR06 3.00 a 6520319.16 1799373.95 3.00 0.00 6520485.03 1799275.77 3.00 0.00
6520476.71 1799258.35 3.00 0.00
6520310.84 1799357.32 3.00 0.00
AREASOURCE CAR07 3.00 a 6520516.69 1799326.05 3.00 0.00 6520533.32 1799315.75 3.00 0.00
6520504.03 1799264.29 3.00 0.00
6520485.03 1799275.77 3.00 0.00
AREASOURCE CAR08 3.00 a 6520380.12 1799413.53 3.00 0.00 6520491.36 1799345.84 3.00 0.00
6520472.36 1799311.40 3.00 0.00
6520359.93 1799380.28 3.00 0.00
Barrier(s)
Name Sel.M.ID Absorption Z-Ext.Cantilever Height Coordinates left right horz.vert.Begin End x y z Ground
(ft)(ft)(ft)(ft)(ft)(ft)(ft)(ft)(ft)
BARRIEREXISTING 0 5.50 a 6520561.26 1799630.82 5.50 0.00 6520533.30 1799584.87 5.50 0.00
6520440.97 1799640.17 5.50 0.00
6520279.05 1799364.70 5.50 0.00
6520488.14 1799237.59 5.50 0.00
BARRIERPLANNED 0 10.00 a 6520566.68 1799398.36 10.00 0.00 6520550.43 1799371.36 10.00 0.00
Building(s)
Name Sel.M.ID RB Residents Absorption Height Coordinates Begin x y z Ground
(ft)(ft)(ft)(ft)(ft)
BUILDING New Building x 0 26.00 a 6520608.54 1799612.26 26.00 0.00 6520634.27 1799598.80 26.00 0.00
6520629.52 1799592.86 26.00 0.00
6520681.38 1799562.77 26.00 0.00
6520649.31 1799513.29 26.00 0.00
6520653.27 1799510.92 26.00 0.00
6520582.80 1799394.53 26.00 0.00
6520536.49 1799423.82 26.00 0.00
6520538.47 1799428.18 26.00 0.00
6520526.20 1799436.89 26.00 0.00
6520522.63 1799431.74 26.00 0.00
6520498.09 1799446.78 26.00 0.00
6520509.96 1799467.77 26.00 0.00
6520508.38 1799468.56 26.00 0.00
Urban Crossroads, Inc.

Attachment I.B
Agenda Page 116

Name Sel.M.ID RB Residents Absorption Height Coordinates Begin x y z Ground
(ft)(ft)(ft)(ft)(ft)
6520517.09 1799483.60 26.00 0.00
6520513.53 1799485.18 26.00 0.00
6520546.78 1799541.00 26.00 0.00
6520560.24 1799533.08 26.00 0.00
BUILDING Existing Building x 0 26.00 a 6520411.79 1799562.38 26.00 0.00 6520475.13 1799523.98 26.00 0.00
6520460.88 1799501.81 26.00 0.00
6520477.50 1799490.73 26.00 0.00
6520440.29 1799430.55 26.00 0.00
6520360.72 1799479.64 26.00 0.00
Urban Crossroads, Inc.

Attachment I.B
Agenda Page 117

15985-03 NA

Attachment I.B
Agenda Page 118

15985-03 NA

ATTACHMENT C

CONSTRUCTION NOISE MODEL CALCULATIONS

Attachment I.B
Agenda Page 119

15985-03 NA

Attachment I.B
Agenda Page 120

15985 - YMCA Downey
CadnaA Noise Prediction Model: 15985-02_Construction.cna Date: 03.05.24
Analyst: B. Lawson
Calculation Configuration
Configuration
Parameter Value
General
Max. Error (dB)0.00
Max. Search Radius (#(Unit,LEN))2000.01
Min. Dist Src to Rcvr 0.00
Partition
Raster Factor 0.50
Max. Length of Section (#(Unit,LEN))999.99
Min. Length of Section (#(Unit,LEN))1.01
Min. Length of Section (%)0.00
Proj. Line Sources On
Proj. Area Sources On
Ref. Time
Daytime Penalty (dB)0.00
Recr. Time Penalty (dB)5.00
Night-time Penalty (dB)10.00
DTM
Standard Height (m)0.00
Model of Terrain Triangulation
Reflection
max. Order of Reflection 2
Search Radius Src 100.00
Search Radius Rcvr 100.00
Max. Distance Source - Rcvr 1000.00 1000.00
Min. Distance Rvcr - Reflector 1.00 1.00
Min. Distance Source - Reflector 0.10
Industrial (ISO 9613)
Lateral Diffraction some Obj
Obst. within Area Src do not shield On
Screening Incl. Ground Att. over Barrier
Dz with limit (20/25)
Barrier Coefficients C1,2,3 3.0 20.0 0.0
Temperature (#(Unit,TEMP))10
rel. Humidity (%)70
Ground Absorption G 0.50
Wind Speed for Dir. (#(Unit,SPEED))3.0
Roads (TNM)
Railways (FTA/FRA)
Aircraft (???)
Strictly acc. to AzB
Receiver Noise Levels
Name M.ID Level Lr Limit. Value Land Use Height Coordinates Day Night CNEL Day Night CNEL Type Auto Noise Type X Y Z (dBA)(dBA)(dBA)(dBA)(dBA)(dBA)(ft)(ft)(ft)(ft)
RECEIVERS R1 77.3 77.3 84.0 50.0 45.0 0.0 5.00 a 6520357.20 1799516.38 5.00 RECEIVERS R2 78.8 78.8 85.4 50.0 45.0 0.0 5.00 a 6520521.45 1799600.39 5.00 RECEIVERS R3 74.2 74.2 80.9 50.0 45.0 0.0 5.00 a 6520670.20 1799349.72 5.00 RECEIVERS R4 77.8 77.8 84.5 50.0 45.0 0.0 5.00 a 6520425.43 1799268.26 5.00 Area Source(s)
Name M.ID Result. PWL Result. PWL''Lw / Li Operating Time Height Day Evening Night Day Evening Night Type Value norm.Day Special Night (ft) (dBA)(dBA)(dBA)(dBA)(dBA)(dBA)dB(A)(min)(min)(min)
SITEBOUNDARY CONSTRUCTION 121.6 121.6 121.6 82.2 82.2 82.2 Lw 121.6 8 a Name ID Height Coordinates
Begin End x y z Ground
(ft)(ft)(ft)(ft)(ft)(ft)
SITEBOUNDARY CONSTRUCTION 8.00 a 6520497.96 1799231.62 8.00 0.00 6520279.05 1799364.70 8.00 0.00
6520440.97 1799640.17 8.00 0.00
6520533.30 1799584.87 8.00 0.00
6520572.01 1799648.49 8.00 0.00
6520688.28 1799577.85 8.00 0.00
6520690.35 1799576.44 8.00 0.00
6520692.15 1799574.69 8.00 0.00
6520693.63 1799572.67 8.00 0.00
6520694.74 1799570.42 8.00 0.00
6520695.45 1799568.02 8.00 0.00
Urban Crossroads, Inc.

Attachment I.B
Agenda Page 121

Name ID Height Coordinates
Begin End x y z Ground
(ft)(ft)(ft)(ft)(ft)(ft)
6520695.74 1799565.53 8.00 0.00
6520695.61 1799563.03 8.00 0.00
6520695.05 1799560.58 8.00 0.00
6520694.08 1799558.27 8.00 0.00
Barrier(s)
Name Sel.M.ID Absorption Z-Ext.Cantilever Height Coordinates left right horz.vert.Begin End x y z Ground
(ft)(ft)(ft)(ft)(ft)(ft)(ft)(ft)(ft)
BARRIEREXISTING 0 5.50 a 6520561.26 1799630.82 5.50 0.00 6520533.30 1799584.87 5.50 0.00
6520440.97 1799640.17 5.50 0.00
6520279.05 1799364.70 5.50 0.00
6520488.14 1799237.59 5.50 0.00
Urban Crossroads, Inc.

Attachment I.B
Agenda Page 122

DATE: May 14, 2024
TO: Tracy Zinn, T&B Planning, Inc.

FROM: Haseeb Qureshi, Urban Crossroads, Inc.

Shannon Wong
JOB NO: 15985-03 AQ & GHG Assessment

YMCA DOWNEY AIR QUALITY & GREENHOUSE GAS ASSESSMENT
Tracy Zinn,
Urban Crossroads, Inc. is pleased to provide the following Air Quality & Greenhouse Gas Assessment for the YMCA Downey (Project), which is at 11531 Downey Avenue which is northwest of Downey Avenue, south of Firestone Boulevard, and east of Paramount Boulevard in the City of Downey (Assessor’s Parcel Numbers [APNs] 6255-013-032, -033, and -034).

PROJECT OVERVIEW
The site is currently developed with 3 structures totaling 61,756 square feet (3,254- square-foot building at 11525 Downey Avenue, 57,673-square-foot building at 11531 Downey Avenue, and 829-square-foot building at 8268 Arnett Street). The site was previously occupied by a YMCA which is currently not operational. The Project includes demolition of the existing structures on-site and developing an 18,808-square-foot gymnasium, 975-square-foot lobby/restrooms, and retrofitting of an approximate 7,625-square-foot existing gymnasium (total of 27,408 square feet). A preliminary site plan for the proposed Project is shown in Exhibit 1. The proposed Project is anticipated to have an opening year of 2026.

SUMMARY OF FINDINGS
Results of the assessment indicate that the Project would result in a less than significant with respect to air quality and greenhouse gases and no mitigation is required.

Attachment I.C
Agenda Page 123

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 2 of 24 ends

15985-03 AQ & GHG Assessment
EXHIBIT 1: SITE PLAN

Attachment I.C
Agenda Page 124

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 3 of 24 ends

15985-03 AQ & GHG Assessment

PROJECT AIR QUALITY IMPACTS

AIR QUALITY SETTING

SOUTH COAST AIR BASIN (SCAB)
The Project site is located in the SCAB within the jurisdiction of South Coast Air Quality Management District (SCAQMD) (1). The SCAQMD was created by the 1977 Lewis-Presley Air Quality Management Act, which merged four county air pollution control bodies into one regional district. Under the Act, the SCAQMD is responsible for bringing air quality in areas under its jurisdiction into conformity with federal and state air quality standards. As previously stated, the Project site is located within the SCAB, a 6,745-square mile subregion of the SCAQMD, which includes portions of Los Angeles, Riverside, and San Bernardino Counties, and all of Orange County.

The SCAB is bounded by the Pacific Ocean to the west and the San Gabriel, San Bernardino, and San Jacinto Mountains to the north and east. The Los Angeles County portion of the Mojave Desert Air Basin is bounded by the San Gabriel Mountains to the south and west, the Los Angeles / Kern County border to the north, and the Los Angeles / San Bernardino County border to the east. The Riverside County portion of the Salton Sea Air Basin is bounded by the San Jacinto Mountains in the west and spans eastward up to the Palo Verde Valley.

Regional Climate
The regional climate has a substantial influence on air quality in the SCAB. In addition, the temperature, wind, humidity, precipitation, and amount of sunshine influence the air quality.

The annual average temperatures throughout the SCAB vary from the low to middle 60s degrees Fahrenheit (°F). Due to a decreased marine influence, the eastern portion of the SCAB shows greater variability in average annual minimum and maximum temperatures. January is the coldest month throughout the SCAB, with average minimum temperatures of 47°F in downtown Los Angeles and 36°F in San Bernardino. All portions of the SCAB have recorded maximum temperatures above 100°F.

Although the climate of the SCAB can be characterized as semi-arid, the air near the land surface is quite moist on most days because of the presence of a marine layer. This shallow layer of sea air is an important modifier of SCAB climate. Humidity restricts visibility in the SCAB, and the conversion of sulfur dioxide (SO2) to sulfates (SO4) is heightened in air with high relative humidity.

The marine layer provides an environment for that conversion process, especially during the spring and summer months. The annual average relative humidity within the SCAB is 71 percent (%) along the coast and 59% inland. Since the ocean effect is dominant, periods of heavy early morning fog are frequent and low stratus clouds are a characteristic feature. These effects decrease with distance from the coast.

More than 90% of the SCAB’s rainfall occurs from November through April. The annual average rainfall varies from approximately nine inches in Riverside to fourteen inches in downtown Los Angeles. Monthly and yearly rainfall totals are extremely variable. Summer rainfall usually consists of widely scattered thunderstorms near the coast and slightly heavier shower activity in the eastern portion of the SCAB with frequency being higher near the coast.

Attachment I.C
Agenda Page 125

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 4 of 24 ends

15985-03 AQ & GHG Assessment
Due to its generally clear weather, about three-quarters of available sunshine is received in the SCAB. The remaining one-quarter is absorbed by clouds. The ultraviolet portion of this abundant radiation is a key factor in photochemical reactions. On the shortest day of the year there are approximately 10 hours of possible sunshine, and on the longest day of the year there are approximately 14½ hours of possible sunshine.

The importance of wind to air pollution is considerable. The direction and speed of the wind determines the horizontal dispersion and transport of the air pollutants. During the late autumn to early spring rainy season, the SCAB is subjected to wind flows associated with the traveling storms moving through the region from the northwest. This period also brings five to ten periods of strong, dry offshore winds, locally termed “Santa Anas” each year. During the dry season, which coincides with the months of maximum photochemical smog concentrations, the wind flow is bimodal, typified by a daytime onshore sea breeze and a nighttime offshore drainage wind.

Summer wind flows are created by the pressure differences between the relatively cold ocean and the unevenly heated and cooled land surfaces that modify the general northwesterly wind circulation over southern California. Nighttime drainage begins with the radiational cooling of the mountain slopes. Heavy, cool air descends the slopes and flows through the mountain passes and canyons as it follows the lowering terrain toward the ocean. Another characteristic wind regime in the SCAB is the “Catalina Eddy,” a low level cyclonic (counterclockwise) flow centered over Santa Catalina Island which results in an offshore flow to the southwest. On most spring and summer days, some indication of an eddy is apparent in coastal sections.

In the SCAB, there are two distinct temperature inversion structures that control vertical mixing of air pollution. During the summer, warm high-pressure descending (subsiding) air is undercut by a shallow layer of cool marine air. The boundary between these two layers of air is a persistent marine subsidence/inversion. This boundary prevents vertical mixing which effectively acts as an impervious lid to pollutants over the entire SCAB. The mixing height for the inversion structure is normally situated 1,000 to 1,500 feet above mean sea level.

A second inversion-type forms in conjunction with the drainage of cool air off the surrounding mountains at night followed by the seaward drift of this pool of cool air. The top of this layer forms a sharp boundary with the warmer air aloft and creates nocturnal radiation inversions.

These inversions occur primarily in the winter when nights are longer and onshore flow is weakest. They are typically only a few hundred feet above mean sea level. These inversions effectively trap pollutants, such as nitrogen oxides (NOX) and carbon monoxide (CO) from vehicles, as the pool of cool air drifts seaward. Winter is therefore a period of high levels of primary pollutants along the coastline.

Wind Patterns and Project Location
The distinctive climate of the Project area and the SCAB is determined by its terrain and geographical location. The SCAB is located in a coastal plain with connecting broad valleys and low hills, bounded by the Pacific Ocean in the southwest quadrant with high mountains forming the remainder of the perimeter.

Wind patterns across the south coastal region are characterized by westerly and southwesterly onshore winds during the day and easterly or northeasterly breezes at night. Winds are characteristically light although the speed is somewhat greater during the dry summer months than during the rainy winter season.

Attachment I.C
Agenda Page 126

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 5 of 24 ends

15985-03 AQ & GHG Assessment
Criteria Pollutants
Both the U.S. Environmental Protection Agency (EPA) and the California Air Resources Board (CARB) have established ambient air quality standards for common pollutants. These ambient air quality standards are levels of contaminants representing safe levels that avoid specific adverse health effects associated with each pollutant. The ambient air quality standards cover what are called “criteria” pollutants because the health and other effects of each pollutant are described in criteria documents. The six criteria pollutants are ozone (O3) (precursor emissions include NOX and reactive organic gases (ROG), CO, particulate matter (PM), nitrogen dioxide (NO2), sulfur dioxide (SO2), and lead. Areas that meet ambient air quality standards are classified as attainment areas, while areas that do not meet these standards are classified as nonattainment areas. The Riverside County portion of the SCAB is designated as a nonattainment area for the federal O3 and PM2.5 standards and is also a nonattainment area for the state standards for O3, PM10, and PM2.5.

Toxic Air Contaminants (TAC) Trend
In 1984, as a result of public concern for exposure to airborne carcinogens, CARB adopted regulations to reduce the amount of TAC emissions resulting from mobile and area sources, such as cars, trucks, stationary products, and consumer products. According to the Ambient and Emission Trends of Toxic Air Contaminants in California journal article (2) which was prepared for CARB, results show that between 1990-2012, ambient concentration and emission trends for the seven TACs responsible for most of the known cancer risk associated with airborne exposure in California have declined significantly (between 1990 and 2012). The seven TACs studied include those that are derived from mobile sources: diesel particulate matter (DPM), benzene (C6H6), and 1,3-butadiene (C4H6); those that are derived from stationary sources: perchloroethylene (C2Cl4) and hexavalent chromium (Cr(VI)); and those derived from photochemical reactions of emitted VOCs: formaldehyde (CH2O) and acetaldehyde (C2H4O)1. The decline in ambient concentration and emission trends of these TACs are a result of various regulations CARB has implemented to address cancer risk.

Some people are especially sensitive to air pollution and are given special consideration when evaluating air quality impacts from projects. These groups of people include children, the elderly, and individuals with pre-existing respiratory or cardiovascular illness. Structures that house these persons or places where they gather are defined as “sensitive receptors”. These structures typically include uses such as residences, hotels, and hospitals where an individual can remain for 24 hours. Consistent with the LST Methodology, the nearest land use where an individual could remain for 24 hours to the Project site has been used to determine construction and operational air quality impacts for emissions of PM10 and PM2.5, since PM10 and PM2.5 thresholds are based on a 24-hour averaging time.

Receptors in the Project study area are described below. All distances are measured from the Project site boundary to the outdoor living areas (e.g., backyards) or at the building façade,

1 It should be noted that ambient DPM concentrations are not measured directly. Rather, a surrogate method using the coefficient of haze (COH) and elemental carbon (EC) is used to estimate DPM concentrations.

Attachment I.C
Agenda Page 127

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 6 of 24 ends

15985-03 AQ & GHG Assessment
whichever is closer to the Project site. Receptors in the Project study area are shown on Exhibit 2 under the Localized Construction Emissions section later in the report. • Receptor R1 represents the existing residence at 11520 Gurley Ave, approximately 6 feet north of the Project site.
• Receptor R2 represents the existing residence at 8260 Arnett St, approximately 7 feet east of the Project site.
• Receptor R3 represents the existing building at 11542 Downey Ave, approximately 86 feet south of the Project site.
• Receptor R4 represents the existing residence at 11565 Downey Ave, adjacent west of the Project site.
• Receptor R5 represents Warren High School at 8141 De Palma St, approximately 769 feet northwest of the Project site.

REGULATORY BACKGROUND

FEDERAL REGULATIONS
The EPA is responsible for setting and enforcing the national ambient air quality standards (NAAQS) for O3, CO, NOX, SO2, PM10, and lead (Pb) (3). The EPA has jurisdiction over emissions sources that are under the authority of the federal government including aircraft, locomotives, and emissions sources outside state waters (Outer Continental Shelf). The EPA also establishes emission standards for vehicles sold in states other than California. Automobiles sold in California must meet the stricter emission requirements of CARB.

The Federal Clean Air Act (CAA) was first enacted in 1955 and has been amended numerous times in subsequent years (1963, 1965, 1967, 1970, 1977, and 1990). The CAA establishes the federal air quality standards, the NAAQS, and specifies future dates for achieving compliance (4). The CAA also mandates that each state submit and implement state implementation plans (SIPs) for local areas not meeting these standards. These plans must include pollution control measures that demonstrate how the standards will be met.

The 1990 amendments to the CAA that identify specific emission reduction goals for areas not meeting the NAAQS require a demonstration of reasonable further progress toward attainment and incorporate additional sanctions for failure to attain or to meet interim milestones. The sections of the CAA most directly applicable to the development of the Project site include Title I (Non-Attainment Provisions) and Title II (Mobile Source Provisions) (5) (6). Title I provisions were established with the goal of attaining the NAAQS for the following criteria pollutants O3, NO2, SO2, PM10, CO, PM2.5, and Pb. The NAAQS were amended in July 1997 to include an additional standard for O3 and to adopt a NAAQS for PM2.5.

Mobile source emissions are regulated in accordance with Title II provisions. These provisions require the use of cleaner burning gasoline and other cleaner burning fuels such as methanol and natural gas. Automobile manufacturers are also required to reduce tailpipe emissions of hydrocarbons and NOX. NOX is a collective term that includes all forms of NOX which are emitted as byproducts of the combustion process.

Attachment I.C
Agenda Page 128

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 7 of 24 ends

15985-03 AQ & GHG Assessment

CALIFORNIA REGULATIONS
CARB
The CARB, which became part of the California EPA (CalEPA) in 1991, is responsible for ensuring implementation of the California Clean Air Act (AB 2595), responding to the federal CAA, and for regulating emissions from consumer products and motor vehicles. AB 2595 mandates achievement of the maximum degree of emissions reductions possible from vehicular and other mobile sources in order to attain the state ambient air quality standards by the earliest practical date. The CARB established the California ambient air quality standards (CAAQS) for all pollutants for which the federal government has NAAQS and, in addition, establishes standards for SO4, visibility, hydrogen sulfide (H2S), and vinyl chloride (C2H3Cl). However, at this time, H2S and C2H3Cl are not measured at any monitoring stations in the SCAB because they are not considered to be a regional air quality problem. Generally, the CAAQS are more stringent than the NAAQS (7) (8).

Local air quality management districts, such as the SCAQMD, regulate air emissions from stationary sources such as commercial and industrial facilities. All air pollution control districts have been formally designated as attainment or non-attainment for each CAAQS.

Serious non-attainment areas are required to prepare Air Quality Management Plans (AQMP) that include specified emission reduction strategies in an effort to meet clean air goals. These plans are required to include:
• Application of Best Available Retrofit Control Technology to existing sources; • Developing control programs for area sources (e.g., architectural coatings and solvents) and indirect sources (e.g. motor vehicle use generated by residential and commercial development);
• A District permitting system designed to allow no net increase in emissions from any new or modified permitted sources of emissions;
• Implementing reasonably available transportation control measures and assuring a substantial reduction in growth rate of vehicle trips and miles traveled; • Significant use of low emissions vehicles by fleet operators; • Sufficient control strategies to achieve a 5% or more annual reduction in emissions or 15% or more in a period of three years for ROGs, NOX, CO and PM10. However, air basins may use alternative emission reduction strategy that achieves a reduction of less than 5% per year under certain circumstances.

AQMP
Currently, the NAAQS and CAAQS are exceeded in most parts of the SCAB. In response, the SCAQMD has adopted a series of AQMP to meet the state and federal ambient air quality standards (9). AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy.

Attachment I.C
Agenda Page 129

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 8 of 24 ends

15985-03 AQ & GHG Assessment

APPLICABLE REGULATORY REQUIRMENTS
SCAQMD Rules that are currently applicable during construction activity for this Project include but are not limited to Rule 403 (Fugitive Dust) and Rule 1113 (Architectural Coatings) (10) (11).

SCAQMD Rule 403
This rule is intended to reduce the amount of particulate matter entrained in the ambient air as a result of anthropogenic (human-made) fugitive dust sources by requiring actions to prevent and reduce fugitive dust emissions. Rule 403 applies to any activity or human-made condition capable of generating fugitive dust and requires best available control measures to be applied to earth moving and grading activities. This rule is intended to reduce PM10 emissions from any transportation, handling, construction, or storage activity that has the potential to generate fugitive dust. PM10 suppression techniques are summarized below. • Portions of a construction site to remain inactive longer than a period of three months will be seeded and watered until grass cover is grown or otherwise stabilized. • All onsite roads will be paved as soon as feasible or watered periodically or chemically stabilized.
• All material transported offsite will be either sufficiently watered or securely covered to prevent excessive amounts of dust.
• The area disturbed by clearing, grading, earthmoving, or excavation operations will be minimized at all times.
• Where vehicles leave a construction site and enter adjacent public streets, the streets will be swept daily or washed down at the end of the workday to remove soil tracked onto the paved surface.

SCAQMD Rule 1113
This rule serves to limit the volatile organic compound (VOC) content of architectural coatings used on projects in the SCAQMD. Any person who supplies, sells, offers for sale, or manufactures any architectural coating for use on projects in the SCAQMD must comply with the current VOC standards set in this rule.

METHODOLOGY
In August 2023, the California Air Pollution Control Officers Association (CAPCOA) in conjunction with other California air districts, including SCAQMD, released the latest version of the CalEEMod Version 2022.1.1.22. The purpose of this model is to calculate construction-source and operational-source criteria pollutant (VOCs, NOX, SOX, CO, PM10, and PM2.5) and GHG emissions from direct and indirect sources; and quantify applicable air quality and GHG reductions achieved from mitigation measures (12). Accordingly, the latest version of CalEEMod has been used for this Project to determine construction and operational air quality and greenhouse gas emissions.

AIR QUALITY REGIONAL EMISSIONS THRESHOLDS
The SCAQMD has developed regional significance thresholds for criteria pollutants, as summarized at Table 1 (13). The SCAQMD’s CEQA Air Quality Significance Thresholds (March Attachment I.C
Agenda Page 130

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 9 of 24 ends

15985-03 AQ & GHG Assessment
2023) indicate that any projects in the South Coast Air Basin (SCAB) with daily emissions that exceed any of the indicated thresholds should be considered as having an individually and cumulatively significant air quality impact.

TABLE 1: MAXIMUM DAILY REGIONAL EMISSIONS THRESHOLDS
Pollutant Construction Operations
NOX 100 lbs/day 55 lbs/day
VOC 75 lbs/day 55 lbs/day
PM10 150 lbs/day 150 lbs/day
PM2.5 55 lbs/day 55 lbs/day
SOX 150 lbs/day 150 lbs/day
CO 550 lbs/day 550 lbs/day
lbs/day – Pounds Per Day

AIR QUALITY LOCALIZED EMISSIONS THRESHOLDS
For this Project, the appropriate SRA for the LST analysis is the SCAQMD Southeast Los Angeles County Area monitoring station (SRA 5). LSTs apply to CO, NO2, PM10, and PM2.5. The SCAQMD produced look-up tables for projects less than or equal to 5 acres in size. The SCAQMD’s screening look-up tables are utilized in determining localized impacts. It should be noted that since the look- up tables identify thresholds at only 1 acre, 2 acres, and 5 acres, linear regression has been utilized to determine localized significance thresholds. Consistent with SCAQMD guidance, the thresholds presented in Table 2 were calculated by interpolating the threshold values for the Project’s disturbed acreage.

The acres disturbed is based on the equipment list and days in the demolition, site preparation, and grading phase according to the anticipated maximum number of acres a given piece of equipment can pass over in an 8-hour workday. The equipment-specific grading rates are summarized in the CalEEMod user’s guide, Appendix A: Calculation Details for CalEEMod (14). It should be noted that the disturbed area per day is representative of a piece of equipment making multiple passes over the same land area. In other words, one Rubber Tired Dozer can make multiple passes over the same land area totaling 0.5 acres in a given 8-hour day. Appendix A of the CalEEMod User Manual only identifies equipment-specific grading rates for Crawler Tractors, Graders, Rubber Tired Dozers, and Scrapers; therefore, Tractors/Loaders/Backhoes equipment that was included in the grading phase was replaced with Crawler Tractors. For analytical purposes, emissions associated with peak demolition, site preparation, and grading activities are considered for purposes of localized significance thresholds (LSTs) since this phase represents the maximum localized emissions that would occur. The Project’s construction activities could disturb a maximum of approximately 0.5 acre per day for demolition, 2 acres per day for site preparation, and 2 acres per day for grading activities. Any other construction phases of development would result in lesser emissions and consequently lesser impacts than what is disclosed herein. As such, Table 2 presents thresholds for localized construction and operational emissions. It should be noted that a 1 acre per day disturbance area for demolition activities was utilized as this is the SCAQMD look-up tables minimum acreage.

Attachment I.C
Agenda Page 131

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 10 of 24 ends

15985-03 AQ & GHG Assessment
TABLE 2: MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS
Source Activity
Emissions (lbs/day)
VOC NOX PM10 PM2.5
Construction
Demolition 80 lbs/day 571 lbs/day 4 lbs/day 3 lbs/day
Site Preparation 114 lbs/day 861 lbs/day 7 lbs/day 4 lbs/day Grading 114 lbs/day 861 lbs/day 7 lbs/day 4 lbs/day
1Source of localized significance threshold (LSTs) is provided on page 17.

CONSTRUCTION ACTIVITIES
Construction activities associated with the Project would result in emissions of VOCs, NOX, SOX, CO, PM10, and PM2.5. Construction related emissions are expected from the following construction activities:
• Demolition
• Site Preparation
• Grading (Import/Export)
• Building Construction
• Paving
• Architectural Coating

DEMOLITION ACTIVITIES
The Project site is currently developed with 3 existing structures that will be demolished, resulting in approximately 54,131 square feet of demolished material.

GRADING ACTIVITIES
Dust is typically a major concern during grading activities. Because such emissions are not amenable to collection and discharge through a controlled source, they are called “fugitive emissions”. Fugitive dust emissions rates vary as a function of many parameters (soil silt, soil moisture, wind speed, area disturbed, number of vehicles, depth of disturbance or excavation, etc.). CalEEMod was utilized to calculate fugitive dust emissions resulting from this phase of activity. This analysis assumes that earthwork activities are expected to balance on site and no import or export of soils would be required. The CalEEMod default trip length of 20-miles will be used to analyze the emissions associated with export activities.

ON-ROAD TRIPS
Construction generates on-road vehicle emissions from vehicle usage for workers, vendors, and haul trucks commuting to and from the site. Worker and hauling trips are based on CalEEMod defaults. It should be noted that for vendor trips, specifically, CalEEMod only assigns vendor trips Attachment I.C
Agenda Page 132

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 11 of 24 ends

15985-03 AQ & GHG Assessment
to the Building Construction phase. Vendor trips would likely occur during all phases of construction. As such, the CalEEMod defaults for vendor trips have been adjusted based on a ratio of the total vendor trips to the number of days of each subphase of activity.

CONSTRUCTION DURATION
For purposes of analysis, construction of Project is expected to commence in November 2024 and would last through December 2025. The construction schedule utilized in the analysis represents a “conservative” analysis scenario should construction occur any time after the respective dates since emission factors for construction decrease as time passes and the analysis year increases due to emission regulations becoming more stringent2. The duration of construction activity and associated equipment represents a reasonable approximation of the expected construction fleet as required per CEQA Guidelines (15).

CONSTRUCTION EQUIPMENT
CalEEMod default parameters for equipment have been used. Consistent with industry standards and typical construction practices, each piece of equipment will operate up to a total of eight (8) hours per day, or more than two-thirds of the period during which construction activities are allowed pursuant to the code.

REGIONAL CONSTRUCTION EMISSIONS SUMMARY
The estimated maximum daily construction emissions are summarized on Table 3, and as shown, the Project construction-source emissions would not exceed SCAQMD regional thresholds. Thus, the Project would result in a less than significant impact associated with construction activities.

Detailed Construction model outputs are presented in Attachment A.

2 As shown in the CalEEMod User’s Guide Version 2022, Appendix G “Table G-11. Statewide Average Annual Offoad Equipment Emission Factors” as the analysis year increases, emission factors for the same equipment pieces decrease due to the natural turnover of older equipment being replaced by newer less polluting equipment and new regulatory requirements.

Attachment I.C
Agenda Page 133

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 12 of 24 ends

15985-03 AQ & GHG Assessment
TABLE 3: REGIONAL CONSTRUCTION EMISSIONS SUMMARY
Source Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Summer
2025 1.34 11.22 13.45 0.02 0.60 0.43
Winter
2024 1.68 16.59 17.18 0.03 1.88 0.85
2025 6.21 17.43 22.42 0.04 3.18 1.81
Maximum Daily Emissions 6.21 17.43 22.42 0.04 3.18 1.81 SCAQMD Regional Threshold 75 100 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
1PM10 and PM2.5 source emissions reflect 3x daily watering per SCAQMD Rule 403 for fugitive dust.

REGIONAL OPERATIONAL EMISSIONS
Operational activities associated with the Project would result in emissions of VOCs, NOX, CO, SOX, PM10, and PM2.5. Operational related emissions are expected from the following primary sources:
area source emissions, energy source emissions, and mobile source emissions.

The Project related operational air quality impacts derive primarily from vehicle trips generated by the Project. Trip characteristics available from the YMCA Downey Trip Generation Assessment were utilized in this analysis (16).

The estimated operation-source emissions from the Project are summarized on Table 4. Detailed operation model outputs are presented in Attachment A. As shown on Table 4, operational- source emissions would not exceed the applicable SCAQMD regional thresholds for emissions of any criteria pollutant.

TABLE 4: TOTAL PROJECT REGIONAL OPERATIONAL EMISSIONS
Source Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Summer
Mobile Source 2.45 1.59 17.88 0.04 3.69 0.95
Area Source 0.83 0.01 1.19 0.00 0.00 0.00
Energy Source 0.02 0.32 0.26 0.00 0.02 0.02
Total Maximum Daily Emissions 3.30 1.92 19.33 0.04 3.71 0.98 SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
Attachment I.C
Agenda Page 134

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 13 of 24 ends

15985-03 AQ & GHG Assessment
Source Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Winter
Mobile Source 2.42 1.74 16.76 0.04 3.69 0.95
Area Source 0.63 0.00 0.00 0.00 0.00 0.00
Energy Source 0.02 0.32 0.26 0.00 0.02 0.02
Total Maximum Daily Emissions 3.07 2.05 17.03 0.04 3.71 0.98 SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO

EXISTING BUILDING OPERATIONAL EMISSIONS
There are 3 existing buildings on the site, which total approximately 54,131 square feet. The estimated operation-source emissions from the existing building are summarized on Table 5.

Detailed operation model outputs are presented in Attachment B.

The existing building related operational air quality impacts derive primarily from vehicle trips generated by the Project. Trip characteristics available from the YMCA Downey Trip Generation Assessment were utilized in this analysis (16).

TABLE 5: EXISTING BUILDING REGIONAL OPERATIONAL EMISSIONS Source Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Summer
Mobile Source 4.91 2.37 35.72 0.07 6.50 1.68
Area Source 1.84 0.02 2.69 0.00 0.00 0.00
Energy Source 0.04 0.71 0.60 0.00 0.05 0.05
Total Maximum Daily Emissions 6.79 3.10 39.00 0.07 6.56 1.73 SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
Winter
Mobile Source 4.83 2.65 33.36 0.07 6.50 1.68
Area Source 1.40 0.00 0.00 0.00 0.00 0.00
Energy Source 0.04 0.71 0.60 0.00 0.05 0.05
Total Maximum Daily Emissions 6.27 3.36 33.96 0.07 6.56 1.73 SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
Attachment I.C
Agenda Page 135

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 14 of 24 ends

15985-03 AQ & GHG Assessment
PROJECT NET NEW OPERATIONAL EMISSIONS – COMPARISON TO EXISTING BUILDING As shown in Table 6, the proposed Project is anticipated to generate less emissions per day for pollutants of VOC, NOX, CO, SOX, PM10, and PM2.5 as compared to emissions generated by the existing building, additionally; the proposed Projects emissions would be less than the applicable thresholds.

TABLE 6: PROJECT NET NEW REGIONAL OPERATIONAL EMISSIONS Source Emissions (lbs/day)
VOC NOX CO SOX PM10 PM2.5
Summer
Proposed Project 3.30 1.92 19.33 0.04 3.71 0.98
Existing Building 6.79 3.10 39.00 0.07 6.56 1.73
Net Emissions (Proposed – Existing) -3.49 -1.18 -19.67 -0.03 -2.85 -0.75 SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO
Winter
Proposed Project 3.07 2.05 17.03 0.04 3.71 0.98
Existing Building 6.27 3.36 33.96 0.07 6.56 1.73
Net Emissions (Proposed – Existing) -3.20 -1.30 -16.93 -0.03 -2.85 -0.75 SCAQMD Regional Threshold 55 55 550 150 150 55
Threshold Exceeded? NO NO NO NO NO NO

LOCALIZED CONSTRUCTION EMISSIONS
The analysis makes use of methodology included in the SCAQMD Final Localized Significance Threshold Methodology (LST Methodology) (17). The SCAQMD has established that impacts to air quality are significant if there is a potential to contribute or cause localized exceedances of the federal and/or state ambient air quality standards (NAAQS/CAAQS). Collectively, these are referred to as Localized Significance Thresholds (LSTs). The SCAQMD established LSTs in response to the SCAQMD Governing Board’s Environmental Justice Initiative I-4 3. LSTs represent the maximum emissions from a project that will not cause or contribute to an exceedance of the most stringent applicable federal or state ambient air quality standard at the sensitive receptor.

The SCAQMD states that lead agencies can use the LSTs as another indicator of significance in its

3 The purpose of SCAQMD’s Environmental Justice program is to ensure that everyone has the right to equal protection from air pollution and fair access to the decision-making process that works to improve the quality of air within their communities. Further, the SCAQMD defines Environmental Justice as “…equitable environmental policymaking and enforcement to protect the health of all residents, regardless of age, culture, ethnicity, gender, race, socioeconomic status, or geographic location, from the health effects of air pollution.” Attachment I.C
Agenda Page 136

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 15 of 24 ends

15985-03 AQ & GHG Assessment
air quality impact analyses. It should be noted that SCAQMD also states that Projects that are statutorily or categorically exempt under CEQA would not be subject to LST analyses. Projects exempt from CEQA also include infill projects that meet the H&S Code provisions. As such, although not required for this Project, LST analysis is presented to further underscore that there are in fact no significant impacts associated with the Project.

The SCAQMD recommends that the nearest sensitive receptor be considered when determining the Project’s potential to cause an individual or cumulatively significant impact. The nearest land use where an individual could remain for 24 hours to the Project site has been used to determine localized construction and operational air quality impacts for emissions of PM10 and PM2.5 (since PM10 and PM2.5 thresholds are based on a 24-hour averaging time). The nearest receptor used for evaluation of localized impacts of PM10 and PM2.5 is location R4, represented by the existing residence at 11565 Downey Ave, adjacent west of the Project site. Receptors in the Project study area shown on Exhibit 2.

As previously stated, and consistent with LST Methodology, the nearest industrial/commercial use to the Project site is used to determine construction and operational LST air impacts for emissions of NOX and CO as the averaging periods for these pollutants are shorter (8 hours or less) and it is reasonable to assume that an individual could be present at these sites for periods of one to 8 hours. It should be noted that the existing residence (R4) is located at a closer distance than the nearest industrial/commercial use. As such, the same receptor will be used for evaluation of localized NOx and CO.

It should be noted that the LST Methodology explicitly states that “It is possible that a project may have receptors closer than 25 meters. Projects with boundaries located closer than 25 meters to the nearest receptor should use the LSTs for receptors located at 25 meters (17).” As such, for evaluation of localized PM10, PM2.5, NOx and CO, a 25-meter distance will be used.

Attachment I.C
Agenda Page 137

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 16 of 24 ends

15985-03 AQ & GHG Assessment
EXHIBIT 2: SENSITIVE RECEPTOR LOCATIONS

Attachment I.C
Agenda Page 138

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 17 of 24 ends

15985-03 AQ & GHG Assessment
Table 7 identifies the localized impacts at the nearest receptor location in the vicinity of the Project. Outputs from the model runs for construction LSTs are provided in Attachment A. For analytical purposes, emissions associated with peak demolition, site preparation, and grading activities are considered for purposes of LSTs since these phases represent the maximum localized emissions that would occur. Any other construction phases of development that overlap would result in lesser emissions and consequently lesser impacts than what is disclosed herein.

As shown in Table 7, emissions resulting from the Project construction will not exceed the numerical thresholds of significance established by the SCAQMD for any criteria pollutant. Thus, a less than significant impact would occur for localized Project-related construction-source emissions and no mitigation is required.

TABLE 7: PROJECT LOCALIZED CONSTRUCTION IMPACTS
On-Site Emissions Emissions (lbs/day)
NOX CO PM10 PM2.5
Demolition
Maximum Daily Emissions 15.58 16.03 1.52 0.75
SCAQMD Localized Threshold 80 571 4 3
Threshold Exceeded? NO NO NO NO
Site Preparation
Maximum Daily Emissions 12.45 11.78 1.17 0.63
SCAQMD Localized Threshold 114 861 7 4
Threshold Exceeded? NO NO NO NO
Grading
Maximum Daily Emissions 17.25 16.12 3.05 1.78
SCAQMD Localized Threshold 114 861 7 4
Threshold Exceeded? NO NO NO NO

LOCALIZED OPERATIONAL EMISSIONS
The Project includes demolition of the existing structures on-site and developing an 18,808- square-foot gymnasium, 975-square-foot lobby/restrooms, and retrofitting of an approximate 7,625-square-foot existing gymnasium (total of 27,408 square feet). According to SCAQMD LST methodology, LSTs would apply to the operational phase of a proposed project, if the project includes stationary sources, or attracts mobile sources that may spend long periods queuing and idling at the site (e.g., transfer facilities and warehouse buildings). The proposed project does not include such uses, and thus, due to the lack of significant stationary source emissions, no LST analysis is needed for operations.

Attachment I.C
Agenda Page 139

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 18 of 24 ends

15985-03 AQ & GHG Assessment

PROJECT GHG ANALYSIS

CLIMATE CHANGE SETTING
Global climate change (GCC) is the change in average meteorological conditions on the earth with respect to temperature, precipitation, and storms. The majority of scientists believe that the climate shift taking place since the Industrial Revolution is occurring at a quicker rate and magnitude than in the past. Scientific evidence suggests that GCC is the result of increased concentrations of GHGs in the earth’s atmosphere, including carbon dioxide (CO2), methane (CH4), nitrous oxide (N2O), and fluorinated gases. The majority of scientists believe that this increased rate of climate change is the result of GHGs resulting from human activity and industrialization over the past 200 years.

An individual project like the proposed Project evaluated in this memo cannot generate enough GHG emissions to affect a discernible change in global climate. However, the proposed Project may participate in the potential for GCC by its incremental contribution of GHGs combined with the cumulative increase of all other sources of GHGs, which when taken together constitute potential influences on GCC. Because these changes may have serious environmental consequences, this memo will evaluate the potential for the proposed Project to have a significant effect upon the environment as a result of its potential contribution to the greenhouse effect.

GCC refers to the change in average meteorological conditions on the earth with respect to temperature, wind patterns, precipitation and storms. Global temperatures are regulated by naturally occurring atmospheric gases such as water vapor, CO2, N2O, CH4, hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF6). These particular gases are important due to their residence time (duration they stay) in the atmosphere, which ranges from 10 years to more than 100 years. These gases allow solar radiation into the earth’s atmosphere, but prevent radiative heat from escaping, thus warming the earth’s atmosphere. GCC can occur naturally as it has in the past with the previous ice ages.

Gases that trap heat in the atmosphere are often referred to as GHGs. GHGs are released into the atmosphere by both natural and anthropogenic activity. Without the natural GHG effect, the earth’s average temperature would be approximately 61 degrees Fahrenheit (°F) cooler than it is currently. The cumulative accumulation of these gases in the earth’s atmosphere is considered to be the cause for the observed increase in the earth’s temperature.

For the purposes of this analysis, emissions of CO2, CH4, and N2O were evaluated because these gases are the primary contributors to GCC from development projects. Although there are other substances such as fluorinated gases that also contribute to GCC, these fluorinated gases were not evaluated as their sources are not well-defined and do not contain accepted emissions factors or methodology to accurately calculate these gases.

REGULATORY SETTING
Executive Order S-3-05
Former California Governor Arnold Schwarzenegger announced on June 1, 2005, through Executive Order S-3-05, the following reduction targets for GHG emissions:
• By 2010, reduce GHG emissions to 2000 levels.

Attachment I.C
Agenda Page 140

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 19 of 24 ends

15985-03 AQ & GHG Assessment
• By 2020, reduce GHG emissions to 1990 levels.
• By 2050, reduce GHG emissions to 80% below 1990 levels.

The 2050 reduction goal represents what some scientists believe is necessary to reach levels that will stabilize the climate. The 2020 goal was established to be a mid-term target. Because this is an executive order, the goals are not legally enforceable for local governments or the private sector.

Assembly Bill (AB) 32
The California State Legislature enacted AB 32, which requires that GHGs emitted in California be reduced to 1990 levels by the year 2020. “GHGs” as defined under AB 32 include CO2, CH4, N2O, hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF6). Since AB 32 was enacted, a seventh chemical, nitrogen trifluoride, has also been added to the list of GHGs.

CARB is the state agency charged with monitoring and regulating sources of GHGs. Pursuant to AB 32, CARB adopted regulations to achieve the maximum technologically feasible and cost- effective GHG emission reductions. AB 32 states the following:
“Global warming poses a serious threat to the economic well-being, public health, natural resources, and the environment of California. The potential adverse impacts of global warming include the exacerbation of air quality problems, a reduction in the quality and supply of water to the state from the Sierra snowpack, a rise in sea levels resulting in the displacement of thousands of coastal businesses and residences, damage to marine ecosystems and the natural environment, and an increase in the incidences of infectious diseases, asthma, and other human health-related problems.”
CARB approved the 1990 GHG emissions level of 427 million metric ton of CO2 equivalent per year (MMTCO2e) on December 6, 2007 (18). Therefore, emissions generated in California in 2020 are required to be equal to or less than 427 MMTCO2e. Emissions in 2020 in a “business as usual” (BAU) scenario were estimated to be 596 MMTCO2e, which do not account for reductions from AB 32 regulations (19). At that level, a 28.4% reduction was required to achieve the 427 MMTCO2e 1990 inventory. In October 2010, CARB prepared an updated BAU 2020 forecast to account for the recession and slower forecasted growth. The forecasted inventory without the benefits of adopted regulation is now estimated at 545 MMTCO2e. Therefore, under the updated forecast, a

21.7% reduction from BAU is required to achieve 1990 levels (20).

Progress in Achieving AB 32 Targets and Remaining Reductions Required The State has made steady progress in implementing AB 32 and achieving targets included in Executive Order S-3-05. The progress is shown in updated emission inventories prepared by CARB for 2000 through 2012 (21). The State has achieved the Executive Order S-3-05 target for 2010 of reducing GHG emissions to 2000 levels. As shown below, the 2010 emission inventory achieved this target.
• 1990: 427 MMTCO2e (AB 32 2020 target)
• 2000: 463 MMTCO2e (an average 8% reduction needed to achieve 1990 base) • 2010: 450 MMTCO2e (an average 5% reduction needed to achieve 1990 base) Attachment I.C
Agenda Page 141

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 20 of 24 ends

15985-03 AQ & GHG Assessment
CARB has also made substantial progress in achieving its goal of achieving 1990 emissions levels by 2020. As described earlier in this section, CARB revised the 2020 BAU inventory forecast to account for new lower growth projections, which resulted in a new lower reduction from BAU to achieve the 1990 base. The previous reduction from 2020 BAU needed to achieve 1990 levels was 28.4% and the latest reduction from 2020 BAU is 21.7%. • 2020: 545 MMTCO2e BAU (an average 21.7% reduction from BAU needed to achieve 1990 base)
Senate Bill (SB) 32
On September 8, 2016, Governor Jerry Brown signed the SB 32 and its companion bill, AB 197. SB 32 requires the state to reduce statewide GHG emissions to 40% below 1990 levels by 2030, a reduction target that was first introduced in Executive Order B-30-15. The new legislation builds upon the AB 32 goal of 1990 levels by 2020 and provides an intermediate goal to achieving S-3- 05, which sets a statewide GHG reduction target of 80% below 1990 levels by 2050. AB 197 creates a legislative committee to oversee regulators to ensure that CARB not only responds to the Governor, but also the Legislature (22).

AB 197
A condition of approval for SB 32 was the passage of AB 197. AB 197 requires that CARB consider the social costs of GHG emissions and prioritize direct reductions in GHG emissions at mobile sources and large stationary sources. AB 197 also gives the California legislature more oversight over CARB through the addition of two legislatively appointed members to the CARB Board and the establishment a legislative committee to make recommendations about CARB programs to the legislature.

Executive Order B-55-18 and SB 100
Executive Order B-55-18 and SB 100. SB 100 and Executive Order B-55-18 were signed by Governor Brown on September 10, 2018. Under the existing RPS, 25% of retail sales are required to be from renewable sources by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. SB 100 raises California’s RPS requirement to 50% renewable resources target by December 31, 2026, and to achieve a 60% target by December 31, 2030. SB 100 also requires that retail sellers and local publicly owned electric utilities procure a minimum quantity of electricity products from eligible renewable energy resources so that the total kilowatt hours of those products sold to their retail end-use customers achieve 44% of retail sales by December 31, 2024, 52% by December 31, 2027, and 60% by December 31, 2030. In addition to targets under AB 32 and SB 32, Executive Order B- 55-18 establishes a carbon neutrality goal for the state of California by 2045; and sets a goal to maintain net negative emissions thereafter. The Executive Order directs the California Natural Resources Agency (CNRA), California Environmental Protection Agency (CalEPA), the Department of Food and Agriculture (CDFA), and CARB to include sequestration targets in the Natural and Working Lands Climate Change Implementation Plan consistent with the carbon neutrality goal.

Title 24 California Code of Regulations (CCR)
California Code of Regulations (CCR) Title 24 Part 6: The California Energy Code was first adopted in 1978 in response to a legislative mandate to reduce California’s energy consumption.

Attachment I.C
Agenda Page 142

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 21 of 24 ends

15985-03 AQ & GHG Assessment
The standards are updated periodically to allow consideration and possible incorporation of new energy efficient technologies and methods. CCR, Title 24, Part 11: California Green Building Standards Code (CALGreen) is a comprehensive and uniform regulatory code for all residential, industrial, commercial, and school buildings that went in effect on August 1, 2009, and is administered by the California Building Standards Commission.

CALGreen is updated on a regular basis, with the most recent approved update consisting of the 2022 California Green Building Code Standards that became effective on January 1, 2023 4. As construction of the Project is anticipated to be completed in 2025, the Project would be required to comply with the Title 24 standards in place at that time.

SCAQMD
SCAQMD is the agency responsible for air quality planning and regulation in the SCAB. The SCAQMD addresses the impacts to climate change of projects subject to SCAQMD permit as a lead agency if they are the only agency having discretionary approval for the project and acts as a responsible agency when a land use agency must also approve discretionary permits for the project. The SCAQMD acts as an expert commenting agency for impacts to air quality. This expertise carries over to GHG emissions, so the agency helps local land use agencies through the development of models and emission thresholds that can be used to address GHG emissions.

In 2008, SCAQMD formed a Working Group to identify GHG emissions thresholds for land use projects that could be used by local lead agencies in the SCAB. The Working Group developed several different options that are contained in the SCAQMD Draft Guidance Document – Interim CEQA GHG Significance Threshold, that could be applied by lead agencies. The working group has not provided additional guidance since the release of the interim guidance in 2008. The SCAQMD Board has not approved the thresholds; however, the Guidance Document provides substantial evidence supporting the approaches to significance of GHG emissions that can be considered by the lead agency in adopting its own threshold. The current interim thresholds consist of the following tiered approach:
• Tier 1 consists of evaluating whether or not the project qualifies for any applicable exemption under CEQA.
• Tier 2 consists of determining whether the project is consistent with a GHG reduction plan. If a project is consistent with a qualifying local GHG reduction plan, it does not have significant GHG emissions.
• Tier 3 consists of screening values, which the lead agency can choose, but must be consistent with all projects within its jurisdiction. A project’s construction emissions are averaged over 30 years and are added to the project’s operational emissions. If a project’s emissions are below one of the following screening thresholds, then the project is less than significant:
o Residential and commercial land use: 3,000 metric ton of CO2 equivalent (MTCO2e/yr)

4 The 2022 California Green Building Standard Code will be published July 1, 2022.

Attachment I.C
Agenda Page 143

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 22 of 24 ends

15985-03 AQ & GHG Assessment
o Industrial land use: 10,000 MTCO2e/yr
o Based on land use type: residential: 3,500 MTCO2e/yr; commercial: 1,400 MTCO2e/yr; or mixed use: 3,000 MTCO2e/yr
• Tier 4 has the following options:
o Option 1: Reduce Business-as-Usual (BAU) emissions by a certain percentage; this percentage is currently undefined.
o Option 2: Early implementation of applicable AB 32 Scoping Plan measures o Option 3: 2020 target for service populations (SP), which includes residents and employees: 4.8 MTCO2e per SP per year for projects and 6.6 MTCO2e per SP per year for plans;
o Option 3, 2035 target: 3.0 MTCO2e per SP per year for projects and 4.1 MTCO2e per SP per year for plans
• Tier 5 involves mitigation offsets to achieve target significance threshold.

The SCAQMD’s interim thresholds used the Executive Order S-3-05-year 2050 goal as the basis for the Tier 3 screening level. Achieving the Executive Order’s objective would contribute to worldwide efforts to cap CO2 concentrations at 450 ppm, thus stabilizing global climate.

SCAQMD only has authority over GHG emissions from development projects that include air quality permits. At this time, it is unknown if the project would include stationary sources of emissions subject to SCAQMD permits. Notwithstanding, if the Project requires a stationary permit, it would be subject to the applicable SCAQMD regulations.

SCAQMD Regulation XXVII, adopted in 2009 includes the following rules:
• Rule 2700 defines terms and post global warming potentials. • Rule 2701, Southern California (SoCal) Climate Solutions Exchange, establishes a voluntary program to encourage, quantify, and certify voluntary, high quality certified GHG emission reductions in the SCAQMD.
• Rule 2702, GHG Reduction Program created a program to produce GHG emission reductions within the SCAQMD. The SCAQMD will fund projects through contracts in response to requests for proposals or purchase reductions from other parties.

SCAQMD is the agency responsible for air quality planning and regulation in the SCAB. The SCAQMD addresses the impacts to climate change of projects subject to SCAQMD permit as a lead agency if they are the only agency having discretionary approval for the project and acts as a responsible agency when a land use agency must also approve discretionary permits for the project. The SCAQMD acts as an expert commenting agency for impacts to air quality. This expertise carries over to GHG emissions, so the agency helps local land use agencies through the development of models and emission thresholds that can be used to address GHG emissions.

Attachment I.C
Agenda Page 144

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 23 of 24 ends

15985-03 AQ & GHG Assessment

GHG IMPACTS

PROJECT GHG EMISSIONS
The estimated GHG emissions for the Project land use are summarized on Table 10. The estimated GHG emission includes emissions from Carbon Dioxide (CO2), Methane (CH4), Nitrous Oxide (N2O), and Refrigerants (R). As shown on Table 10, the Project would generate a total of approximately 730.60 MTCO2e/yr. Detailed operation model outputs for the proposed Project are presented in Attachment A.

TABLE 10: TOTAL PROJECT GHG EMISSIONS
Source Emission (MT/year)
CO2 CH4 N2O Refrigerants Total CO2e
Annual construction-related emissions
amortized over 30 years 12.52 5.21E-04 2.66E-04 2.26E-03 12.62 Mobile 544.05 0.03 0.02 0.81 553.05
Area 0.56 0.00 0.00 0.00 0.56
Energy 111.14 0.01 0.00 0.00 111.59
Water 2.30 0.05 0.00 0.00 4.01
Waste 13.94 1.39 0.00 0.00 48.77
Refrigerants 0.00 0.00 0.00 0.00 0.00
Total CO2e (All Sources) 730.60

EXISTING BUILDING GHG EMISSIONS
There are 3 existing buildings on the site, which total approximately 54,131 square feet. The estimated GHG emissions from the existing buildings are summarized on Table 11. Detailed operation model outputs for the existing buildings are presented in Attachment B.

TABLE 11: EXISTING BUILDING GHG EMISSIONS
Source
Emission (MT/year)
CO2 CH4 N2O Refrigerants Total CO2e
Mobile Source 827.77 0.05 0.03 1.39 839.36
Area Source 1.25 0.00 0.00 0.00 1.26
Energy Source 233.94 0.02 0.00 0.00 234.87
Water 5.09 0.12 0.00 0.00 8.93
Waste 31.41 3.14 0.00 0.00 109.89
Refrigerants 0.00 0.00 0.00 0.01 0.01
Total CO2e (All Sources) 1,194.31
Attachment I.C
Agenda Page 145

Tracy Zinn, T&B Planning, Inc.

May 14, 2024

Page 24 of 24 ends

15985-03 AQ & GHG Assessment
PROJECT NET NEW GHG EMISSIONS – COMPARISON TO EXISTING BUILDING Table 12 shows the Project is anticipated to generate less GHG emissions per day as compared to emissions generated by the existing building, additionally; the proposed Projects emissions would be less than the applicable thresholds.

TABLE 12: PROJECT NET NEW GHG EMISSIONS
Emission Source Total CO2e
Proposed Project 730.60
Existing Building 1,194.31
Net Emissions (Proposed – Existing) -463.70
The Project would result in a net decrease of approximately 463.70 MTCO2e/yr; the proposed Project would not exceed the SCAQMD’s numeric threshold of 3,000 MTCO2e/yr. Thus, the Project would result in a less than significant impact with respect to GHG emissions and no mitigation is required.

CONCLUSION
Results of the assessment indicate that the Project is not anticipated to result in a significant impact during construction or operational activities associated with air quality and GHG and no mitigation is required.

Attachment I.C
Agenda Page 146

15985-03 AQ & GHG Assessment

REFERENCES

1. South Coast Air Quality Management District. Southern California Air Basins. [Online] https://www.arb.ca.gov/msprog/onroad/porttruck/maps/scabc7map.pdf .

2. Ralph Propper, Patrick Wong, Son Bui, Jeff Austin, William Vance, Alvaro Alvarado, Bart Croes, and Dongmin Luo. Ambient and Emission Trends of Toxic Air Contaminants in California. American Chemical Society: Environmental Science & Technology. 2015.

3. United States Environmental Protection Agency. National Ambient Air Quality Standards (NAAQS). [Online] 1990. https://www.epa.gov/environmental-topics/air-topics .

4. Environmental Protection Agency. Air Pollution and the Clean Air Act. [Online] http://www.epa.gov/air/caa/ .

5. 1990 Clean Air Act Amendment Summary: Title I. [Online] https://www.epa.gov/clean- air-act-overview/1990-clean-air-act-amendment-summary-title-i.

6. United States Environmental Protection Agency. 1990 Clean Air Act Amendment Summary: Title II. [Online] https://www.epa.gov/clean-air-act-overview/1990- clean-air-act-amendment-summary-title-ii.

7. Air Resources Board. California Ambient Air Quality Standards (CAAQS). [Online] 2009. [Cited: April 16, 2018.] http://www.arb.ca.gov/research/aaqs/caaqs/caaqs.htm .

8. Environmental Protection Agency. National Ambient Air Quality Standards (NAAQS). [Online] 1990. https://www.epa.gov/environmental-topics/air-topics .

9. Southern California Association of Governments. 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy. [Online] April 2016. http://scagrtpscs.net/Documents/2016/final/f2016RTPSCS.pdf .

10. South Coast Air Quality Management District. RULE 403. FUGITIVE DUST. [Online] https://www.aqmd.gov/docs/default-source/rule-book/rule-iv/rule- 403.pdf?sfvrsn=4.

11. —. RULE 1113. Architectural Coatings. [Online] http://www.aqmd.gov/docs/default- source/rule-book/reg-xi/r1113.pdf.

12. California Air Pollution Control Officers Association (CAPCOA). California Emissions Estimator Model (CalEEMod). [Online] May 2022. www.caleemod.com .

13. South Coast Air Quality Management District (SCAQMD). SCAQMD Air Quality Significance Thresholds. [Online] https://www.aqmd.gov/docs/default- source/ceqa/handbook/south-coast-aqmd-air-quality-significance- thresholds.pdf.

14. California Air Pollution Control Officers Association (CAPCOA). Appendix A: Calculation Details for CalEEMod. CalEEMod. [Online] http://www.aqmd.gov/docs/default- source/caleemod/02_appendix-a2016-3-2.pdf?sfvrsn=6.

15. State of California. 2020 CEQA California Environmental Quality Act. 2020.

Attachment I.C
Agenda Page 147

15985-03 AQ & GHG Assessment

16. Urban Crossroads, Inc. YMCA Downey Trip Generation Assessment. 2024.

17. South Coast Air Quality Management District. Localized Significance Thresholds Methodology. s.l. : South Coast Air Quality Managment District, 2003.

18. California Air Resources Board. GHG 1990 Emissions Level & 2020 Limit. California Air Resources Board. [Online] https://ww2.arb.ca.gov/ghg-2020-limit .

19. —. Climate Change Draft Scoping Plan. 2008.

20. —. STATUS OF SCOPING PLAN RECOMMENDED MEASURES. [Online] [Cited: September 19, 2019.]
https://ww3.arb.ca.gov/cc/scopingplan/status_of_scoping_plan_measures.pdf .

21. —. First Update to the Climate Change Scoping Plan. 2014.

22. California Legislative Information. Senate Bill No. 32. [Online] September 8, 2016. https://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201520160SB3

2. 23. South Coast Air Quality Management District. Interim CEQA GHG Threshold for Stationary Sources, Rules and Plans. [Online] December 5, 2008. http://www.aqmd.gov/docs/default-source/ceqa/handbook/greenhouse-gases- (ghg)-ceqa-significance-thresholds/ghgboardsynopsis.pdf.

Attachment I.C
Agenda Page 148

15985-03 AQ & GHG Assessment

ATTACHMENT A

CALEEMOD PROPOSED PROJECT EMISSIONS MODEL OUTPUTS
Attachment I.C
Agenda Page 149

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 1 / 49
15985 - YMCA Downey (Proposed) Detailed Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds

2.2. Construction Emissions by Year, Unmitigated

2.4. Operations Emissions Compared Against Thresholds

2.5. Operations Emissions by Sector, Unmitigated

3. Construction Emissions Details

3.1. Demolition (2024) - Unmitigated

3.3. Demolition (2025) - Unmitigated

3.5. Site Preparation (2025) - Unmitigated

3.7. Grading (2025) - Unmitigated
Attachment I.C
Agenda Page 150

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 2 / 49

3.9. Building Construction (2025) - Unmitigated

3.11. Paving (2025) - Unmitigated

3.13. Architectural Coating (2025) - Unmitigated

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated

4.2. Energy

4.2.1. Electricity Emissions By Land Use - Unmitigated

4.2.3. Natural Gas Emissions By Land Use - Unmitigated

4.3. Area Emissions by Source

4.3.1. Unmitigated

4.4. Water Emissions by Land Use

4.4.1. Unmitigated

4.5. Waste Emissions by Land Use

4.5.1. Unmitigated

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated
Attachment I.C
Agenda Page 151

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 3 / 49

4.7. Offroad Emissions By Equipment Type

4.7.1. Unmitigated

4.8. Stationary Emissions By Equipment Type

4.8.1. Unmitigated

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated

5. Activity Data

5.1. Construction Schedule

5.2. Off-Road Equipment

5.2.1. Unmitigated

5.3. Construction Vehicles

5.3.1. Unmitigated

5.4. Vehicles
Attachment I.C
Agenda Page 152

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 4 / 49

5.4.1. Construction Vehicle Control Strategies

5.5. Architectural Coatings

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities

5.6.2. Construction Earthmoving Control Strategies

5.7. Construction Paving

5.8. Construction Electricity Consumption and Emissions Factors

5.9. Operational Mobile Sources

5.9.1. Unmitigated

5.10. Operational Area Sources

5.10.1. Hearths

5.10.1.1. Unmitigated

5.10.2. Architectural Coatings

5.10.3. Landscape Equipment

5.11. Operational Energy Consumption

5.11.1. Unmitigated

5.12. Operational Water and Wastewater Consumption
Attachment I.C
Agenda Page 153

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 5 / 49

5.12.1. Unmitigated

5.13. Operational Waste Generation

5.13.1. Unmitigated

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps

5.16.2. Process Boilers

5.17. User Defined

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.2. Sequestration
Attachment I.C
Agenda Page 154

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 6 / 49

5.18.2.1. Unmitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores

7.4. Health & Equity Measures

7.5. Evaluation Scorecard

7.6. Health & Equity Custom Measures

8. User Changes to Default Data
Attachment I.C
Agenda Page 155

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 7 / 49

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name 15985 - YMCA Downey (Proposed)
Construction Start Date 11/1/2024
Operational Year 2026
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s)2.30
Precipitation (days)8.00
Location 33.93695041272885, -118.13568786210762
County Los Angeles-South Coast
City Downey
Air District South Coast AQMD
Air Basin South Coast
TAZ 4857
EDFZ 7
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.22

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Attachment I.C
Agenda Page 156

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 8 / 49
Health Club 27.4 1000sqft 0.63 27,408 4,931 ———
Parking Lot 141 Space 1.27 0.00 0.00 ———
Other Asphalt
Surfaces

0.26 Acre 0.26 0.00 0.00 ———

1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.60 1.34 11.2 13.4 0.02 0.43 0.18 0.60 0.39 0.04 0.43 — 2,566 2,566 0.10 0.04 0.84 2,581 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.51 6.21 17.4 22.4 0.04 0.94 2.25 3.18 0.86 0.95 1.81 — 3,999 3,999 0.16 0.14 0.06 4,019 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1.19 1.40 8.48 9.83 0.02 0.34 0.30 0.64 0.31 0.09 0.40 — 1,864 1,864 0.08 0.03 0.29 1,876 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.22 0.26 1.55 1.79 < 0.005 0.06 0.06 0.12 0.06 0.02 0.07 — 309 309 0.01 0.01 0.05 311

2.2. Construction Emissions by Year, Unmitigated
Attachment I.C
Agenda Page 157

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 9 / 49
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2025 1.60 1.34 11.2 13.4 0.02 0.43 0.18 0.60 0.39 0.04 0.43 — 2,566 2,566 0.10 0.04 0.84 2,581 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — — —
2024 2.04 1.68 16.6 17.2 0.03 0.68 1.20 1.88 0.63 0.22 0.85 — 3,391 3,391 0.15 0.14 0.06 3,437 2025 2.51 6.21 17.4 22.4 0.04 0.94 2.25 3.18 0.86 0.95 1.81 — 3,999 3,999 0.16 0.14 0.06 4,019 Average
Daily
— — — — — — — — — — — — — — — — — —
2024 0.24 0.20 1.98 2.06 < 0.005 0.08 0.14 0.22 0.07 0.03 0.10 — 405 405 0.02 0.02 0.12 411 2025 1.19 1.40 8.48 9.83 0.02 0.34 0.30 0.64 0.31 0.09 0.40 — 1,864 1,864 0.08 0.03 0.29 1,876 Annual — — — — — — — — — — — — — — — — — —
2024 0.04 0.04 0.36 0.38 < 0.005 0.01 0.03 0.04 0.01 < 0.005 0.02 — 67.1 67.1 < 0.005 < 0.005 0.02 68.0 2025 0.22 0.26 1.55 1.79 < 0.005 0.06 0.06 0.12 0.06 0.02 0.07 — 309 309 0.01 0.01 0.05 311

2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.91 3.30 1.92 19.3 0.04 0.05 3.66 3.71 0.05 0.93 0.98 87.3 4,785 4,872 9.02 0.18 13.7 5,166 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 2.67 3.07 2.05 17.0 0.04 0.05 3.66 3.71 0.05 0.93 0.98 87.3 4,611 4,698 9.03 0.19 0.38 4,982 Attachment I.C
Agenda Page 158

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 10 / 49
——————————————————Average
Daily
(Max)
Unmit. 2.34 2.77 1.77 15.2 0.03 0.05 3.01 3.06 0.05 0.76 0.81 87.3 3,972 4,059 8.99 0.16 4.92 4,337 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.43 0.51 0.32 2.78 0.01 0.01 0.55 0.56 0.01 0.14 0.15 14.5 658 672 1.49 0.03 0.81 718

2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 2.66 2.45 1.59 17.9 0.04 0.03 3.66 3.69 0.02 0.93 0.95 — 4,098 4,098 0.22 0.17 13.7 4,169 Area 0.21 0.83 0.01 1.19 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.90 4.90 < 0.005 < 0.005 — 4.92 Energy 0.03 0.02 0.32 0.26 < 0.005 0.02 — 0.02 0.02 — 0.02 — 671 671 0.06 < 0.005 — 674 Water — — — — — — — — — — — 3.11 10.8 13.9 0.32 0.01 — 24.2 Waste — — — — — — — — — — — 84.2 0.00 84.2 8.42 0.00 — 295 Refrig. — — — — — — — — — — — — — — — — 0.02 0.02
Total 2.91 3.30 1.92 19.3 0.04 0.05 3.66 3.71 0.05 0.93 0.98 87.3 4,785 4,872 9.02 0.18 13.7 5,166 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 2.63 2.42 1.74 16.8 0.04 0.03 3.66 3.69 0.02 0.93 0.95 — 3,929 3,929 0.23 0.18 0.36 3,989 Area — 0.63 — — — — — — — — — — — — — — — —
Energy 0.03 0.02 0.32 0.26 < 0.005 0.02 — 0.02 0.02 — 0.02 — 671 671 0.06 < 0.005 — 674 Water — — — — — — — — — — — 3.11 10.8 13.9 0.32 0.01 — 24.2 Waste — — — — — — — — — — — 84.2 0.00 84.2 8.42 0.00 — 295 Refrig. — — — — — — — — — — — — — — — — 0.02 0.02
Attachment I.C
Agenda Page 159

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 11 / 49
Total 2.67 3.07 2.05 17.0 0.04 0.05 3.66 3.71 0.05 0.93 0.98 87.3 4,611 4,698 9.03 0.19 0.38 4,982 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 2.16 1.99 1.45 14.2 0.03 0.02 3.01 3.03 0.02 0.76 0.78 — 3,286 3,286 0.19 0.15 4.89 3,340 Area 0.15 0.77 0.01 0.82 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 3.36 3.36 < 0.005 < 0.005 — 3.37 Energy 0.03 0.02 0.32 0.26 < 0.005 0.02 — 0.02 0.02 — 0.02 — 671 671 0.06 < 0.005 — 674 Water — — — — — — — — — — — 3.11 10.8 13.9 0.32 0.01 — 24.2 Waste — — — — — — — — — — — 84.2 0.00 84.2 8.42 0.00 — 295 Refrig. — — — — — — — — — — — — — — — — 0.02 0.02
Total 2.34 2.77 1.77 15.2 0.03 0.05 3.01 3.06 0.05 0.76 0.81 87.3 3,972 4,059 8.99 0.16 4.92 4,337 Annual — — — — — — — — — — — — — — — — — —
Mobile 0.39 0.36 0.26 2.58 0.01 < 0.005 0.55 0.55 < 0.005 0.14 0.14 — 544 544 0.03 0.02 0.81 553 Area 0.03 0.14 < 0.005 0.15 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.56 0.56 < 0.005 < 0.005 — 0.56 Energy 0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 111 111 0.01 < 0.005 — 112 Water — — — — — — — — — — — 0.51 1.79 2.30 0.05 < 0.005 — 4.01 Waste — — — — — — — — — — — 13.9 0.00 13.9 1.39 0.00 — 48.8 Refrig. — — — — — — — — — — — — — — — — < 0.005 < 0.005 Total 0.43 0.51 0.32 2.78 0.01 0.01 0.55 0.56 0.01 0.14 0.15 14.5 658 672 1.49 0.03 0.81 718

3. Construction Emissions Details

3.1. Demolition (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 160

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 12 / 49
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

1.92 1.61 15.6 16.0 0.02 0.67 — 0.67 0.62 — 0.62 — 2,494 2,494 0.10 0.02 — 2,502 Demolitio
n
— — — — — — 0.85 0.85 — 0.13 0.13 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.23 0.19 1.86 1.91 < 0.005 0.08 — 0.08 0.07 — 0.07 — 298 298 0.01 < 0.005 — 299 Demolitio
n
— — — — — — 0.10 0.10 — 0.02 0.02 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.04 0.04 0.34 0.35 < 0.005 0.01 — 0.01 0.01 — 0.01 — 49.3 49.3 < 0.005 < 0.005 — 49.5 Demolitio
n
— — — — — — 0.02 0.02 — < 0.005 < 0.005 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.06 0.07 0.80 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 167 167 0.01 0.01 0.02 169 Vendor < 0.005 < 0.005 0.04 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 32.3 32.3 < 0.005 < 0.005 < 0.005 33.6 Attachment I.C
Agenda Page 161

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 13 / 49
Hauling 0.05 0.01 0.91 0.33 < 0.005 0.01 0.18 0.19 0.01 0.05 0.06 — 697 697 0.04 0.11 0.04 732 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.01 0.10 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 20.3 20.3 < 0.005 < 0.005 0.04 20.5 Vendor < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 3.85 3.85 < 0.005 < 0.005 < 0.005 4.02 Hauling 0.01 < 0.005 0.11 0.04 < 0.005 < 0.005 0.02 0.02 < 0.005 0.01 0.01 — 83.2 83.2 < 0.005 0.01 0.08 87.4 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 3.36 3.36 < 0.005 < 0.005 0.01 3.40 Vendor < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 0.64 0.64 < 0.005 < 0.005 < 0.005 0.67 Hauling < 0.005 < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 13.8 13.8 < 0.005 < 0.005 0.01 14.5

3.3. Demolition (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

1.75 1.47 13.9 15.1 0.02 0.57 — 0.57 0.52 — 0.52 — 2,494 2,494 0.10 0.02 — 2,502 Demolitio
n
— — — — — — 0.85 0.85 — 0.13 0.13 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.10 0.08 0.76 0.83 < 0.005 0.03 — 0.03 0.03 — 0.03 — 137 137 0.01 < 0.005 — 137 Attachment I.C
Agenda Page 162

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 14 / 49
Demolitio — — — — — — 0.05 0.05 — 0.01 0.01 — — — — — — — Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.02 0.01 0.14 0.15 < 0.005 0.01 — 0.01 0.01 — 0.01 — 22.6 22.6 < 0.005 < 0.005 — 22.7 Demolitio
n
— — — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.06 0.74 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 164 164 0.01 0.01 0.02 166 Vendor < 0.005 < 0.005 0.04 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 31.7 31.7 < 0.005 < 0.005 < 0.005 33.1 Hauling 0.05 0.01 0.87 0.33 < 0.005 0.01 0.18 0.19 0.01 0.05 0.06 — 685 685 0.04 0.11 0.04 718 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.04 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 9.11 9.11 < 0.005 < 0.005 0.01 9.23 Vendor < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 1.74 1.74 < 0.005 < 0.005 < 0.005 1.82 Hauling < 0.005 < 0.005 0.05 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 37.5 37.5 < 0.005 0.01 0.04 39.4 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.51 1.51 < 0.005 < 0.005 < 0.005 1.53 Vendor < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 0.29 0.29 < 0.005 < 0.005 < 0.005 0.30 Hauling < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 6.22 6.22 < 0.005 < 0.005 0.01 6.52 Attachment I.C
Agenda Page 163

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 15 / 49

3.5. Site Preparation (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

1.65 1.39 12.5 11.8 0.03 0.62 — 0.62 0.57 — 0.57 — 2,811 2,811 0.11 0.02 — 2,821 Dust
From
Material
Movement
— — — — — — 0.55 0.55 — 0.06 0.06 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.02 0.02 0.14 0.13 < 0.005 0.01 — 0.01 0.01 — 0.01 — 30.8 30.8 < 0.005 < 0.005 — 30.9 Dust
From
Material
Movement
— — — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 5.10 5.10 < 0.005 < 0.005 — 5.12 Attachment I.C
Agenda Page 164

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 16 / 49
———————< 0.005< 0.005—< 0.005< 0.005——————Dust
From
Material
Movement
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.04 0.03 0.04 0.44 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 98.3 98.3 < 0.005 < 0.005 0.01 99.5 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.09 1.09 < 0.005 < 0.005 < 0.005 1.11 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.18 0.18 < 0.005 < 0.005 < 0.005 0.18 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.7. Grading (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 165

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 17 / 49
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

2.27 1.91 17.3 16.1 0.02 0.94 — 0.94 0.86 — 0.86 — 2,644 2,644 0.11 0.02 — 2,653 Dust
From
Material
Movement
— — — — — — 2.12 2.12 — 0.92 0.92 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.12 0.10 0.95 0.88 < 0.005 0.05 — 0.05 0.05 — 0.05 — 145 145 0.01 < 0.005 — 145 Dust
From
Material
Movement
— — — — — — 0.12 0.12 — 0.05 0.05 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.02 0.02 0.17 0.16 < 0.005 0.01 — 0.01 0.01 — 0.01 — 24.0 24.0 < 0.005 < 0.005 — 24.1 Dust
From
Material
Movement
— — — — — — 0.02 0.02 — 0.01 0.01 — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 166

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 18 / 49
——————————————————Daily,
Summer
(Max)
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.05 0.04 0.05 0.59 0.00 0.00 0.13 0.13 0.00 0.03 0.03 — 131 131 0.01 < 0.005 0.01 133 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 7.29 7.29 < 0.005 < 0.005 0.01 7.39 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.21 1.21 < 0.005 < 0.005 < 0.005 1.22 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.9. Building Construction (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

1.54 1.28 11.1 12.6 0.02 0.42 — 0.42 0.39 — 0.39 — 2,312 2,312 0.09 0.02 — 2,320 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Attachment I.C
Agenda Page 167

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 19 / 49
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

1.54 1.28 11.1 12.6 0.02 0.42 — 0.42 0.39 — 0.39 — 2,312 2,312 0.09 0.02 — 2,320 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.87 0.72 6.21 7.07 0.01 0.24 — 0.24 0.22 — 0.22 — 1,299 1,299 0.05 0.01 — 1,303 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.16 0.13 1.13 1.29 < 0.005 0.04 — 0.04 0.04 — 0.04 — 215 215 0.01 < 0.005 — 216 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.06 0.05 0.05 0.80 0.00 0.00 0.15 0.15 0.00 0.04 0.04 — 159 159 0.01 0.01 0.58 162 Vendor 0.01 < 0.005 0.11 0.05 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 95.2 95.2 < 0.005 0.01 0.26 99.5 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.05 0.05 0.06 0.68 0.00 0.00 0.15 0.15 0.00 0.04 0.04 — 151 151 0.01 0.01 0.02 153 Vendor 0.01 < 0.005 0.11 0.05 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 95.2 95.2 < 0.005 0.01 0.01 99.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 168

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 20 / 49
Worker 0.03 0.03 0.03 0.40 0.00 0.00 0.08 0.08 0.00 0.02 0.02 — 86.0 86.0 < 0.005 < 0.005 0.14 87.1 Vendor < 0.005 < 0.005 0.06 0.03 < 0.005 < 0.005 0.01 0.02 < 0.005 < 0.005 < 0.005 — 53.5 53.5 < 0.005 0.01 0.06 55.8 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker 0.01 < 0.005 0.01 0.07 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 14.2 14.2 < 0.005 < 0.005 0.02 14.4 Vendor < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 8.85 8.85 < 0.005 < 0.005 0.01 9.24 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.11. Paving (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.83 0.70 6.13 8.21 0.01 0.27 — 0.27 0.25 — 0.25 — 1,244 1,244 0.05 0.01 — 1,248 Paving — 0.40 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.02 0.02 0.17 0.23 < 0.005 0.01 — 0.01 0.01 — 0.01 — 34.1 34.1 < 0.005 < 0.005 — 34.2 Paving — 0.01 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Attachment I.C
Agenda Page 169

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 21 / 49
Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.03 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 5.64 5.64 < 0.005 < 0.005 — 5.66 Paving — < 0.005 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Worker 0.07 0.06 0.07 0.88 0.00 0.00 0.20 0.20 0.00 0.05 0.05 — 197 197 0.01 0.01 0.02 199 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.03 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 5.47 5.47 < 0.005 < 0.005 0.01 5.54 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.90 0.90 < 0.005 < 0.005 < 0.005 0.92 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

3.13. Architectural Coating (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 170

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 22 / 49
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.21 0.17 1.18 1.52 < 0.005 0.04 — 0.04 0.03 — 0.03 — 178 178 0.01 < 0.005 — 179 Architect
ural
Coatings
— 4.70 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.02 0.01 0.10 0.13 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 15.1 15.1 < 0.005 < 0.005 — 15.2 Architect
ural
Coatings
— 0.40 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 2.50 2.50 < 0.005 < 0.005 — 2.51 Architect
ural
Coatings
— 0.07 — — — — — — — — — — — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 171

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 23 / 49
——————————————————Daily,
Winter
(Max)
Worker 0.01 0.01 0.01 0.14 0.00 0.00 0.03 0.03 0.00 0.01 0.01 — 30.2 30.2 < 0.005 < 0.005 < 0.005 30.6 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.60 2.60 < 0.005 < 0.005 < 0.005 2.64 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.43 0.43 < 0.005 < 0.005 < 0.005 0.44 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club

2.66 2.45 1.59 17.9 0.04 0.03 3.66 3.69 0.02 0.93 0.95 — 4,098 4,098 0.22 0.17 13.7 4,169 Attachment I.C
Agenda Page 172

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 24 / 49

0.000.000.000.000.000.00—0.000.000.000.000.000.000.000.000.000.000.00Parking Lot
Other
Asphalt
Surfaces

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 2.66 2.45 1.59 17.9 0.04 0.03 3.66 3.69 0.02 0.93 0.95 — 4,098 4,098 0.22 0.17 13.7 4,169 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club

2.63 2.42 1.74 16.8 0.04 0.03 3.66 3.69 0.02 0.93 0.95 — 3,929 3,929 0.23 0.18 0.36 3,989 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Other
Asphalt
Surfaces

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 2.63 2.42 1.74 16.8 0.04 0.03 3.66 3.69 0.02 0.93 0.95 — 3,929 3,929 0.23 0.18 0.36 3,989 Annual — — — — — — — — — — — — — — — — — —
Health
Club

0.39 0.36 0.26 2.58 0.01 < 0.005 0.55 0.55 < 0.005 0.14 0.14 — 544 544 0.03 0.02 0.81 553 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Other
Asphalt
Surfaces

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.39 0.36 0.26 2.58 0.01 < 0.005 0.55 0.55 < 0.005 0.14 0.14 — 544 544 0.03 0.02 0.81 553

4.2. Energy

4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Attachment I.C
Agenda Page 173

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 25 / 49
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — — 249 249 0.02 < 0.005 — 251
Parking
Lot
— — — — — — — — — — — — 45.9 45.9 < 0.005 < 0.005 — 46.2 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — — 295 295 0.03 < 0.005 — 297 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — — 249 249 0.02 < 0.005 — 251
Parking
Lot
— — — — — — — — — — — — 45.9 45.9 < 0.005 < 0.005 — 46.2 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — — 295 295 0.03 < 0.005 — 297 Annual — — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — — 41.3 41.3 < 0.005 < 0.005 — 41.5 Parking
Lot
— — — — — — — — — — — — 7.60 7.60 < 0.005 < 0.005 — 7.65 Other
Asphalt
Surfaces
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — — 48.9 48.9 < 0.005 < 0.005 — 49.2

4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Attachment I.C
Agenda Page 174

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 26 / 49
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club

0.03 0.02 0.32 0.26 < 0.005 0.02 — 0.02 0.02 — 0.02 — 376 376 0.03 < 0.005 — 377 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Other
Asphalt
Surfaces

0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.03 0.02 0.32 0.26 < 0.005 0.02 — 0.02 0.02 — 0.02 — 376 376 0.03 < 0.005 — 377 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club

0.03 0.02 0.32 0.26 < 0.005 0.02 — 0.02 0.02 — 0.02 — 376 376 0.03 < 0.005 — 377 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Other
Asphalt
Surfaces

0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.03 0.02 0.32 0.26 < 0.005 0.02 — 0.02 0.02 — 0.02 — 376 376 0.03 < 0.005 — 377 Annual — — — — — — — — — — — — — — — — — —
Health
Club

0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 62.2 62.2 0.01 < 0.005 — 62.4 Parking
Lot

0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Other
Asphalt
Surfaces

0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.01 < 0.005 0.06 0.05 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 62.2 62.2 0.01 < 0.005 — 62.4 Attachment I.C
Agenda Page 175

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 27 / 49

4.3. Area Emissions by Source

4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Products
— 0.59 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 0.04 — — — — — — — — — — — — — — — —
Landsca
pe
Equipme
nt

0.21 0.20 0.01 1.19 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.90 4.90 < 0.005 < 0.005 — 4.92 Total 0.21 0.83 0.01 1.19 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.90 4.90 < 0.005 < 0.005 — 4.92 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Products
— 0.59 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 0.04 — — — — — — — — — — — — — — — —
Total — 0.63 — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Consum
er
Products
— 0.11 — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 176

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 28 / 49
————————————————0.01—Architect
ural
Landsca
pe
Equipme
nt

0.03 0.02 < 0.005 0.15 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.56 0.56 < 0.005 < 0.005 — 0.56 Total 0.03 0.14 < 0.005 0.15 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.56 0.56 < 0.005 < 0.005 — 0.56

4.4. Water Emissions by Land Use

4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — 3.11 10.8 13.9 0.32 0.01 — 24.2
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 3.11 10.8 13.9 0.32 0.01 — 24.2 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — 3.11 10.8 13.9 0.32 0.01 — 24.2
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Attachment I.C
Agenda Page 177

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 29 / 49

0.00—0.000.000.000.000.00———————————Other
Asphalt
Surfaces
Total — — — — — — — — — — — 3.11 10.8 13.9 0.32 0.01 — 24.2 Annual — — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — 0.51 1.79 2.30 0.05 < 0.005 — 4.01 Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 0.51 1.79 2.30 0.05 < 0.005 — 4.01

4.5. Waste Emissions by Land Use

4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — 84.2 0.00 84.2 8.42 0.00 — 295
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 84.2 0.00 84.2 8.42 0.00 — 295 Attachment I.C
Agenda Page 178

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 30 / 49
——————————————————Daily,
Winter
(Max)
Health
Club
— — — — — — — — — — — 84.2 0.00 84.2 8.42 0.00 — 295
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 84.2 0.00 84.2 8.42 0.00 — 295 Annual — — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — 13.9 0.00 13.9 1.39 0.00 — 48.8
Parking
Lot
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Other
Asphalt
Surfaces
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 13.9 0.00 13.9 1.39 0.00 — 48.8

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — — — — — — 0.02 0.02
Total — — — — — — — — — — — — — — — — 0.02 0.02
Attachment I.C
Agenda Page 179

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 31 / 49
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — — — — — — 0.02 0.02
Total — — — — — — — — — — — — — — — — 0.02 0.02
Annual — — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — — — — — — < 0.005 < 0.005
Total — — — — — — — — — — — — — — — — < 0.005 < 0.005

4.7. Offroad Emissions By Equipment Type

4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.8. Stationary Emissions By Equipment Type
Attachment I.C
Agenda Page 180

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 32 / 49

4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 181

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 33 / 49
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetatio
n
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 182

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 34 / 49
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 183

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 35 / 49
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —

5. Activity Data

5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 11/1/2024 1/28/2025 5.00 63.0 20
Site Preparation Site Preparation 1/29/2025 2/3/2025 5.00 4.00 3 Grading Grading 2/4/2025 3/3/2025 5.00 20.0 6
Building Construction Building Construction 3/4/2025 12/15/2025 5.00 205 220 Paving Paving 10/2/2025 10/15/2025 5.00 10.0 10
Architectural Coating Architectural Coating 11/3/2025 12/15/2025 5.00 31.0 10

5.2. Off-Road Equipment

5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Attachment I.C
Agenda Page 184

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 36 / 49
Demolition Concrete/Industrial
Saws
Diesel Average 1.00 8.00 33.0 0.73
Demolition Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40 Demolition Tractors/Loaders/Backh
oes
Diesel Average 3.00 8.00 84.0 0.37
Site Preparation Graders Diesel Average 1.00 8.00 148 0.41 Site Preparation Scrapers Diesel Average 1.00 8.00 423 0.48 Site Preparation Crawler Tractors Diesel Average 1.00 8.00 87.0 0.43 Grading Graders Diesel Average 1.00 8.00 148 0.41
Grading Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40 Grading Crawler Tractors Diesel Average 2.00 8.00 87.0 0.43 Building Construction Cranes Diesel Average 1.00 8.00 367 0.29 Building Construction Forklifts Diesel Average 2.00 8.00 82.0 0.20 Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 Building Construction Tractors/Loaders/Backh
oes
Diesel Average 1.00 8.00 84.0 0.37
Building Construction Welders Diesel Average 3.00 8.00 46.0 0.45 Paving Cement and Mortar
Mixers
Diesel Average 1.00 8.00 10.0 0.56
Paving Pavers Diesel Average 1.00 8.00 81.0 0.42
Paving Paving Equipment Diesel Average 1.00 8.00 89.0 0.36 Paving Rollers Diesel Average 2.00 8.00 36.0 0.38
Paving Tractors/Loaders/Backh
oes
Diesel Average 1.00 8.00 84.0 0.37
Architectural Coating Air Compressors Diesel Average 1.00 8.00 37.0 0.48

5.3. Construction Vehicles

5.3.1. Unmitigated
Attachment I.C
Agenda Page 185

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 37 / 49
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition ————
Demolition Worker 12.5 18.5 LDA,LDT1,LDT2
Demolition Vendor 1.00 10.2 HHDT,MHDT
Demolition Hauling 9.89 20.0 HHDT
Demolition Onsite truck ——HHDT
Site Preparation ————
Site Preparation Worker 7.50 18.5 LDA,LDT1,LDT2
Site Preparation Vendor —10.2 HHDT,MHDT
Site Preparation Hauling 0.00 20.0 HHDT
Site Preparation Onsite truck ——HHDT
Grading ————
Grading Worker 10.0 18.5 LDA,LDT1,LDT2
Grading Vendor —10.2 HHDT,MHDT
Grading Hauling 0.00 20.0 HHDT
Grading Onsite truck ——HHDT
Building Construction ————
Building Construction Worker 11.5 18.5 LDA,LDT1,LDT2
Building Construction Vendor 3.00 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck ——HHDT
Paving ————
Paving Worker 15.0 18.5 LDA,LDT1,LDT2
Paving Vendor —10.2 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck ——HHDT
Architectural Coating ————
Attachment I.C
Agenda Page 186

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 38 / 49
Architectural Coating Worker 2.30 18.5 LDA,LDT1,LDT2
Architectural Coating Vendor —10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck ——HHDT

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies
Non-applicable. No control strategies activated by user.

5.5. Architectural Coatings
Phase Name Residential Interior Area Coated
(sq ft)
Residential Exterior Area Coated
(sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)
Architectural Coating 0.00 0.00 41,112 13,704 3,996

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy)Material Exported (cy)Acres Graded (acres)Material Demolished (Building Square Footage)
Acres Paved (acres)
Demolition 0.00 0.00 0.00 54,131 —
Site Preparation ——8.00 0.00 —
Grading ——40.0 0.00 —
Paving 0.00 0.00 0.00 0.00 1.53

5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day)PM10 Reduction PM2.5 Reduction Water Exposed Area 3 74%74%
Attachment I.C
Agenda Page 187

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 39 / 49

5.7. Construction Paving
Land Use Area Paved (acres)% Asphalt
Health Club 0.00 0%
Parking Lot 1.27 100%
Other Asphalt Surfaces 0.26 100%

5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2024 0.00 349 0.03 < 0.005
2025 0.00 349 0.03 < 0.005

5.9. Operational Mobile Sources

5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Health Club 790 249 373 238,379 5,161 1,630 2,435 1,557,517 Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Other Asphalt
Surfaces

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.10. Operational Area Sources

5.10.1. Hearths

5.10.1.1. Unmitigated
Attachment I.C
Agenda Page 188

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 40 / 49

5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft)Residential Exterior Area Coated (sq ft)Non-Residential Interior Area Coated (sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
0 0.00 41,112 13,704 3,996

5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250

5.11. Operational Energy Consumption

5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr) Health Club 262,918 346 0.0330 0.0040 1,173,116
Parking Lot 48,423 346 0.0330 0.0040 0.00
Other Asphalt Surfaces 0.00 346 0.0330 0.0040 0.00

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated
Land Use Indoor Water (gal/year)Outdoor Water (gal/year) Health Club 1,620,995 69,155
Parking Lot 0.00 0.00
Other Asphalt Surfaces 0.00 0.00
Attachment I.C
Agenda Page 189

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 41 / 49

5.13. Operational Waste Generation

5.13.1. Unmitigated
Land Use Waste (ton/year)Cogeneration (kWh/year)
Health Club 156 —
Parking Lot 0.00 —
Other Asphalt Surfaces 0.00 —

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced Health Club Other commercial A/C
and heat pumps
User Defined 750 < 0.005 4.00 4.00 18.0
Health Club Stand-alone retail
refrigerators and
freezers
User Defined 150 0.04 1.00 0.00 1.00

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor Attachment I.C
Agenda Page 190

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 42 / 49

5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr)

5.17. User Defined
Equipment Type Fuel Type

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Attachment I.C
Agenda Page 191

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 43 / 49
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 8.91 annual days of extreme heat Extreme Precipitation 4.70 annual days with precipitation above 20 mm Sea Level Rise —meters of inundation depth
Wildfire 0.00 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events.

Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation,population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

Attachment I.C
Agenda Page 192

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 44 / 49
The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.

6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 1 1 2
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 1 1 2
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.

Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 47.0
AQ-PM 85.6
AQ-DPM 53.1
Attachment I.C
Agenda Page 193

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 45 / 49
Drinking Water 58.4
Lead Risk Housing 76.7
Pesticides 0.00
Toxic Releases 92.1
Traffic 63.1
Effect Indicators —
CleanUp Sites 53.9
Groundwater 88.1
Haz Waste Facilities/Generators 81.9
Impaired Water Bodies 0.00
Solid Waste 36.5
Sensitive Population —
Asthma 51.4
Cardio-vascular 85.3
Low Birth Weights 9.19
Socioeconomic Factor Indicators —
Education 80.0
Housing 60.6
Linguistic 69.2
Poverty 68.5
Unemployment 68.4

7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

Indicator Result for Project Census Tract
Economic —
Above Poverty 28.46143975
Attachment I.C
Agenda Page 194

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 46 / 49
Employed 60.23354292
Median HI 25.36892083
Education —
Bachelor's or higher 15.47542666
High school enrollment 100
Preschool enrollment 67.62479148
Transportation —
Auto Access 21.12151931
Active commuting 52.05954061
Social —
2-parent households 10.12447068
Voting 10.88156037
Neighborhood —
Alcohol availability 22.76401899
Park access 11.44616964
Retail density 60.02823046
Supermarket access 63.96766329
Tree canopy 33.81239574
Housing —
Homeownership 16.80995765
Housing habitability 14.14089568
Low-inc homeowner severe housing cost burden 49.48030284 Low-inc renter severe housing cost burden 58.02643398
Uncrowded housing 26.88310022
Health Outcomes —
Insured adults 35.51905556
Arthritis 32.9
Attachment I.C
Agenda Page 195

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 47 / 49
Asthma ER Admissions 49.9
High Blood Pressure 39.5
Cancer (excluding skin)40.8
Asthma 58.2
Coronary Heart Disease 17.4
Chronic Obstructive Pulmonary Disease 37.6
Diagnosed Diabetes 19.9
Life Expectancy at Birth 33.6
Cognitively Disabled 35.0
Physically Disabled 18.7
Heart Attack ER Admissions 41.1
Mental Health Not Good 39.0
Chronic Kidney Disease 14.8
Obesity 30.3
Pedestrian Injuries 88.0
Physical Health Not Good 27.6
Stroke 22.5
Health Risk Behaviors —
Binge Drinking 61.9
Current Smoker 48.5
No Leisure Time for Physical Activity 31.5
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 77.6
Elderly 27.3
English Speaking 30.7
Attachment I.C
Agenda Page 196

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 48 / 49
Foreign-born 64.3
Outdoor Workers 62.2
Climate Change Adaptive Capacity —
Impervious Surface Cover 9.7
Traffic Density 62.7
Traffic Access 60.2
Other Indices —
Hardship 67.4
Other Decision Support —
2016 Voting 15.1

7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a)79.0
Healthy Places Index Score for Project Location (b)25.0 Project Located in a Designated Disadvantaged Community (Senate Bill 535)No Project Located in a Low-Income Community (Assembly Bill 1550)Yes Project Located in a Community Air Protection Program Community (Assembly Bill 617)No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

7.4. Health & Equity Measures
No Health & Equity Measures selected.

7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.

7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.

Attachment I.C
Agenda Page 197

15985 - YMCA Downey (Proposed) Detailed Report, 5/2/2024 49 / 49

8. User Changes to Default Data
Screen Justification
Construction: Construction Phases Building Construction, Paving, and Architectural Coating overlap to present a conservative analysis Construction: Off-Road Equipment T/L/B replaced with Crawler Tractor to accurately calculate disturbance for Site Preparation and Grading phases. Standard 8 hours work days.

Construction: Architectural Coatings SCAQMD Rule 1113
Operations: Vehicle Data Trip characteristics based on information provided in the Trip Generation assessment.

Operations: Architectural Coatings SCAQMD Rule 1113
Operations: Refrigerants As of 1 January 2022, new commercial refrigeration equipment may not use refrigerants with a GWP of 150 or greater. Further, R-404A (the CalEEMod default) is unacceptable for new supermarket and cold storage systems as of 1 January 2019 and 2023, respectively.

Beginning 1 January 2025, all new air conditioning equipment may not use refrigerants with a GWP of 750 or greater.

Construction: Trips and VMT Vendor Trips adjusted based on CalEEMod defaults for Building Construction and number of days for Demolition, Site Preparation, Grading, and Building Construction Attachment I.C
Agenda Page 198

15985-03 AQ & GHG Assessment

ATTACHMENT B

CALEEMOD EXISTING EMISSIONS MODEL OUTPUTS
Attachment I.C
Agenda Page 199

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 1 / 30
15985 - YMCA Downey (Existing) Detailed Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.4. Operations Emissions Compared Against Thresholds

2.5. Operations Emissions by Sector, Unmitigated

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated

4.2. Energy

4.2.1. Electricity Emissions By Land Use - Unmitigated

4.2.3. Natural Gas Emissions By Land Use - Unmitigated

4.3. Area Emissions by Source
Attachment I.C
Agenda Page 200

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 2 / 30

4.3.1. Unmitigated

4.4. Water Emissions by Land Use

4.4.1. Unmitigated

4.5. Waste Emissions by Land Use

4.5.1. Unmitigated

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated

4.7. Offroad Emissions By Equipment Type

4.7.1. Unmitigated

4.8. Stationary Emissions By Equipment Type

4.8.1. Unmitigated

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Attachment I.C
Agenda Page 201

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 3 / 30

5. Activity Data

5.9. Operational Mobile Sources

5.9.1. Unmitigated

5.10. Operational Area Sources

5.10.1. Hearths

5.10.1.1. Unmitigated

5.10.2. Architectural Coatings

5.10.3. Landscape Equipment

5.11. Operational Energy Consumption

5.11.1. Unmitigated

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated

5.13. Operational Waste Generation

5.13.1. Unmitigated

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated

5.15. Operational Off-Road Equipment
Attachment I.C
Agenda Page 202

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 4 / 30

5.15.1. Unmitigated

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps

5.16.2. Process Boilers

5.17. User Defined

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.2. Sequestration

5.18.2.1. Unmitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures
Attachment I.C
Agenda Page 203

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 5 / 30

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores

7.4. Health & Equity Measures

7.5. Evaluation Scorecard

7.6. Health & Equity Custom Measures

8. User Changes to Default Data
Attachment I.C
Agenda Page 204

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 6 / 30

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name 15985 - YMCA Downey (Existing)
Operational Year 2024
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s)2.30
Precipitation (days)8.00
Location 33.93695041272885, -118.13568786210762
County Los Angeles-South Coast
City Downey
Air District South Coast AQMD
Air Basin South Coast
TAZ 4857
EDFZ 7
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.22

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft)Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Health Club 61.8 1000sqft 2.16 61,756 0.00 ———
Attachment I.C
Agenda Page 205

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 7 / 30
User Defined
Recreational

61.8 User Defined Unit 0.00 0.00 0.00 ———

1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected

2. Emissions Summary

2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit.TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 5.81 6.79 3.10 39.0 0.07 0.10 6.46 6.56 0.10 1.64 1.73 197 8,530 8,726 20.2 0.26 26.6 9,334 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 5.26 6.27 3.36 34.0 0.07 0.10 6.46 6.56 0.09 1.64 1.73 197 8,185 8,382 20.2 0.28 0.74 8,969 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 4.17 5.25 2.68 27.4 0.05 0.09 4.70 4.79 0.09 1.19 1.28 197 6,444 6,641 20.1 0.21 8.43 7,214 Annual
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 0.76 0.96 0.49 5.00 0.01 0.02 0.86 0.87 0.02 0.22 0.23 32.6 1,067 1,099 3.33 0.03 1.40 1,194

2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Attachment I.C
Agenda Page 206

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 8 / 30
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 5.25 4.91 2.37 35.7 0.07 0.04 6.46 6.50 0.04 1.64 1.68 — 7,082 7,082 0.37 0.23 26.5 7,186 Area 0.48 1.84 0.02 2.69 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.0 11.0 < 0.005 < 0.005 — 11.1 Energy 0.08 0.04 0.71 0.60 < 0.005 0.05 — 0.05 0.05 — 0.05 — 1,413 1,413 0.13 0.01 — 1,419 Water — — — — — — — — — — — 7.00 23.7 30.7 0.72 0.02 — 53.9 Waste — — — — — — — — — — — 190 0.00 190 19.0 0.00 — 664 Refrig. — — — — — — — — — — — — — — — — 0.06 0.06
Total 5.81 6.79 3.10 39.0 0.07 0.10 6.46 6.56 0.10 1.64 1.73 197 8,530 8,726 20.2 0.26 26.6 9,334 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 5.19 4.83 2.65 33.4 0.07 0.04 6.46 6.50 0.04 1.64 1.68 — 6,748 6,748 0.39 0.25 0.69 6,833 Area — 1.40 — — — — — — — — — — — — — — — —
Energy 0.08 0.04 0.71 0.60 < 0.005 0.05 — 0.05 0.05 — 0.05 — 1,413 1,413 0.13 0.01 — 1,419 Water — — — — — — — — — — — 7.00 23.7 30.7 0.72 0.02 — 53.9 Waste — — — — — — — — — — — 190 0.00 190 19.0 0.00 — 664 Refrig. — — — — — — — — — — — — — — — — 0.06 0.06
Total 5.26 6.27 3.36 34.0 0.07 0.10 6.46 6.56 0.09 1.64 1.73 197 8,185 8,382 20.2 0.28 0.74 8,969 Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 3.76 3.51 1.95 25.0 0.05 0.03 4.70 4.73 0.03 1.19 1.22 — 5,000 5,000 0.28 0.18 8.38 5,070 Area 0.33 1.70 0.02 1.84 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 7.56 7.56 < 0.005 < 0.005 — 7.59 Energy 0.08 0.04 0.71 0.60 < 0.005 0.05 — 0.05 0.05 — 0.05 — 1,413 1,413 0.13 0.01 — 1,419 Water — — — — — — — — — — — 7.00 23.7 30.7 0.72 0.02 — 53.9 Waste — — — — — — — — — — — 190 0.00 190 19.0 0.00 — 664 Refrig. — — — — — — — — — — — — — — — — 0.06 0.06
Total 4.17 5.25 2.68 27.4 0.05 0.09 4.70 4.79 0.09 1.19 1.28 197 6,444 6,641 20.1 0.21 8.43 7,214 Attachment I.C
Agenda Page 207

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 9 / 30
Annual — — — — — — — — — — — — — — — — — —
Mobile 0.69 0.64 0.36 4.56 0.01 0.01 0.86 0.86 0.01 0.22 0.22 — 828 828 0.05 0.03 1.39 839 Area 0.06 0.31 < 0.005 0.34 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.25 1.25 < 0.005 < 0.005 — 1.26 Energy 0.01 0.01 0.13 0.11 < 0.005 0.01 — 0.01 0.01 — 0.01 — 234 234 0.02 < 0.005 — 235 Water — — — — — — — — — — — 1.16 3.93 5.09 0.12 < 0.005 — 8.93 Waste — — — — — — — — — — — 31.4 0.00 31.4 3.14 0.00 — 110 Refrig. — — — — — — — — — — — — — — — — 0.01 0.01
Total 0.76 0.96 0.49 5.00 0.01 0.02 0.86 0.87 0.02 0.22 0.23 32.6 1,067 1,099 3.33 0.03 1.40 1,194

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club

4.81 4.47 2.15 35.4 0.07 0.04 6.36 6.40 0.04 1.61 1.64 — 6,800 6,800 0.36 0.22 25.6 6,899 User
Defined
Recreational

0.44 0.44 0.22 0.32 < 0.005 < 0.005 0.10 0.10 < 0.005 0.03 0.03 — 282 282 < 0.005 0.01 0.89 287 Total 5.25 4.91 2.37 35.7 0.07 0.04 6.46 6.50 0.04 1.64 1.68 — 7,082 7,082 0.37 0.23 26.5 7,186 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club

4.79 4.45 2.42 33.0 0.06 0.04 6.36 6.40 0.04 1.61 1.64 — 6,466 6,466 0.39 0.24 0.66 6,547 Attachment I.C
Agenda Page 208

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 10 / 30
User
Defined
Recreational

0.39 0.39 0.23 0.31 < 0.005 < 0.005 0.10 0.10 < 0.005 0.03 0.03 — 282 282 < 0.005 0.01 0.02 286 Total 5.19 4.83 2.65 33.4 0.07 0.04 6.46 6.50 0.04 1.64 1.68 — 6,748 6,748 0.39 0.25 0.69 6,833 Annual — — — — — — — — — — — — — — — — — —
Health
Club

0.63 0.59 0.33 4.51 0.01 0.01 0.84 0.85 < 0.005 0.21 0.22 — 794 794 0.05 0.03 1.34 805 User
Defined
Recreational

0.05 0.05 0.03 0.04 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 34.1 34.1 < 0.005 < 0.005 0.05 34.7 Total 0.69 0.64 0.36 4.56 0.01 0.01 0.86 0.86 0.01 0.22 0.22 — 828 828 0.05 0.03 1.39 839

4.2. Energy

4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — — 566 566 0.05 0.01 — 569
User
Defined
Recreational
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — — 566 566 0.05 0.01 — 569
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — — 566 566 0.05 0.01 — 569
Attachment I.C
Agenda Page 209

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 11 / 30

0.00—0.000.000.000.00————————————User
Defined
Recreational
Total — — — — — — — — — — — — 566 566 0.05 0.01 — 569
Annual — — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — — 93.7 93.7 0.01 < 0.005 — 94.2
User
Defined
Recreational
— — — — — — — — — — — — 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — — 93.7 93.7 0.01 < 0.005 — 94.2

4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club

0.08 0.04 0.71 0.60 < 0.005 0.05 — 0.05 0.05 — 0.05 — 847 847 0.07 < 0.005 — 849 User
Defined
Recreational

0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.08 0.04 0.71 0.60 < 0.005 0.05 — 0.05 0.05 — 0.05 — 847 847 0.07 < 0.005 — 849 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club

0.08 0.04 0.71 0.60 < 0.005 0.05 — 0.05 0.05 — 0.05 — 847 847 0.07 < 0.005 — 849 User
Defined
Recreational

0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Attachment I.C
Agenda Page 210

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 12 / 30
Total 0.08 0.04 0.71 0.60 < 0.005 0.05 — 0.05 0.05 — 0.05 — 847 847 0.07 < 0.005 — 849 Annual — — — — — — — — — — — — — — — — — —
Health
Club

0.01 0.01 0.13 0.11 < 0.005 0.01 — 0.01 0.01 — 0.01 — 140 140 0.01 < 0.005 — 141 User
Defined
Recreational

0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.01 0.01 0.13 0.11 < 0.005 0.01 — 0.01 0.01 — 0.01 — 140 140 0.01 < 0.005 — 141

4.3. Area Emissions by Source

4.3.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Consum
er
Products
— 1.32 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 0.08 — — — — — — — — — — — — — — — —
Landsca
pe
Equipme
nt

0.48 0.44 0.02 2.69 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.0 11.0 < 0.005 < 0.005 — 11.1 Total 0.48 1.84 0.02 2.69 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.0 11.0 < 0.005 < 0.005 — 11.1 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 211

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 13 / 30
————————————————1.32—Consum
er
Products
Architect
ural
Coatings
— 0.08 — — — — — — — — — — — — — — — —
Total — 1.40 — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Consum
er
Products
— 0.24 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 0.01 — — — — — — — — — — — — — — — —
Landsca
pe
Equipme
nt

0.06 0.06 < 0.005 0.34 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.25 1.25 < 0.005 < 0.005 — 1.26 Total 0.06 0.31 < 0.005 0.34 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.25 1.25 < 0.005 < 0.005 — 1.26

4.4. Water Emissions by Land Use

4.4.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — 7.00 23.7 30.7 0.72 0.02 — 53.9
User
Defined
Recreational
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Attachment I.C
Agenda Page 212

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 14 / 30
Total — — — — — — — — — — — 7.00 23.7 30.7 0.72 0.02 — 53.9 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — 7.00 23.7 30.7 0.72 0.02 — 53.9
User
Defined
Recreational
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 7.00 23.7 30.7 0.72 0.02 — 53.9 Annual — — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — 1.16 3.93 5.09 0.12 < 0.005 — 8.93 User
Defined
Recreational
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 1.16 3.93 5.09 0.12 < 0.005 — 8.93

4.5. Waste Emissions by Land Use

4.5.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — 190 0.00 190 19.0 0.00 — 664
User
Defined
Recreational
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 190 0.00 190 19.0 0.00 — 664 Attachment I.C
Agenda Page 213

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 15 / 30
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — 190 0.00 190 19.0 0.00 — 664
User
Defined
Recreational
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 190 0.00 190 19.0 0.00 — 664 Annual — — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — 31.4 0.00 31.4 3.14 0.00 — 110
User
Defined
Recreational
— — — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — — 31.4 0.00 31.4 3.14 0.00 — 110

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — — — — — — 0.06 0.06
Total — — — — — — — — — — — — — — — — 0.06 0.06
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 214

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 16 / 30

0.060.06————————————————Health
Club
Total — — — — — — — — — — — — — — — — 0.06 0.06
Annual — — — — — — — — — — — — — — — — — —
Health
Club
— — — — — — — — — — — — — — — — 0.01 0.01
Total — — — — — — — — — — — — — — — — 0.01 0.01

4.7. Offroad Emissions By Equipment Type

4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.8. Stationary Emissions By Equipment Type

4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Attachment I.C
Agenda Page 215

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 17 / 30
Equipme
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 216

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 18 / 30

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetatio
n
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 217

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 19 / 30

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Sequest
ered
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Attachment I.C
Agenda Page 218

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 20 / 30
Sequest — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
Remove
d
— — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —

5. Activity Data

5.9. Operational Mobile Sources

5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Health Club 1,390 117 46.9 370,992 9,083 767 307 2,423,978 User Defined
Recreational

8.03 0.68 0.25 2,141 118 10.0 3.64 31,585

5.10. Operational Area Sources

5.10.1. Hearths

5.10.1.1. Unmitigated

5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft)Residential Exterior Area Coated (sq ft)Non-Residential Interior Area Coated (sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
0 0.00 92,634 30,878 —

5.10.3. Landscape Equipment
Attachment I.C
Agenda Page 219

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 21 / 30
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250

5.11. Operational Energy Consumption

5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr)CO2 CH4 N2O Natural Gas (kBTU/yr) Health Club 592,409 349 0.0330 0.0040 2,643,277
User Defined Recreational 0.00 349 0.0330 0.0040 0.00

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated
Land Use Indoor Water (gal/year)Outdoor Water (gal/year) Health Club 3,652,444 0.00
User Defined Recreational 0.00 0.00

5.13. Operational Waste Generation

5.13.1. Unmitigated
Land Use Waste (ton/year)Cogeneration (kWh/year)
Health Club 352 —
User Defined Recreational 0.00 —

5.14. Operational Refrigeration and Air Conditioning Equipment Attachment I.C
Agenda Page 220

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 22 / 30

5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg)Operations Leak Rate Service Leak Rate Times Serviced Health Club Other commercial A/C
and heat pumps
User Defined 750 < 0.005 4.00 4.00 18.0
Health Club Stand-alone retail
refrigerators and
freezers
User Defined 150 0.04 1.00 0.00 1.00

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor

5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr)Daily Heat Input (MMBtu/day)Annual Heat Input (MMBtu/yr)

5.17. User Defined
Equipment Type Fuel Type

5.18. Vegetation

5.18.1. Land Use Change
Attachment I.C
Agenda Page 221

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 23 / 30

5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year)Natural Gas Saved (btu/year)

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 8.91 annual days of extreme heat Extreme Precipitation 4.70 annual days with precipitation above 20 mm Sea Level Rise —meters of inundation depth
Wildfire 0.00 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Attachment I.C
Agenda Page 222

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 24 / 30
Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (Radke et al., 2017, CEC-500-2017-008), and consider inundation location and depth for the San Francisco Bay, the Sacramento-San Joaquin River Delta and California coast resulting different increments of sea level rise coupled with extreme storm events.

Users may select from four scenarios to view the range in potential inundation depth for the grid cell. The four scenarios are: No rise, 0.5 meter, 1.0 meter, 1.41 meters Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation,population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.

6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 1 1 1 2
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 1 1 2
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Attachment I.C
Agenda Page 223

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 25 / 30
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.

Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 47.0
AQ-PM 85.6
AQ-DPM 53.1
Drinking Water 58.4
Lead Risk Housing 76.7
Pesticides 0.00
Toxic Releases 92.1
Traffic 63.1
Effect Indicators —
CleanUp Sites 53.9
Groundwater 88.1
Haz Waste Facilities/Generators 81.9
Impaired Water Bodies 0.00
Attachment I.C
Agenda Page 224

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 26 / 30
Solid Waste 36.5
Sensitive Population —
Asthma 51.4
Cardio-vascular 85.3
Low Birth Weights 9.19
Socioeconomic Factor Indicators —
Education 80.0
Housing 60.6
Linguistic 69.2
Poverty 68.5
Unemployment 68.4

7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

Indicator Result for Project Census Tract
Economic —
Above Poverty 28.46143975
Employed 60.23354292
Median HI 25.36892083
Education —
Bachelor's or higher 15.47542666
High school enrollment 100
Preschool enrollment 67.62479148
Transportation —
Auto Access 21.12151931
Active commuting 52.05954061
Social —
Attachment I.C
Agenda Page 225

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 27 / 30
2-parent households 10.12447068
Voting 10.88156037
Neighborhood —
Alcohol availability 22.76401899
Park access 11.44616964
Retail density 60.02823046
Supermarket access 63.96766329
Tree canopy 33.81239574
Housing —
Homeownership 16.80995765
Housing habitability 14.14089568
Low-inc homeowner severe housing cost burden 49.48030284 Low-inc renter severe housing cost burden 58.02643398
Uncrowded housing 26.88310022
Health Outcomes —
Insured adults 35.51905556
Arthritis 32.9
Asthma ER Admissions 49.9
High Blood Pressure 39.5
Cancer (excluding skin)40.8
Asthma 58.2
Coronary Heart Disease 17.4
Chronic Obstructive Pulmonary Disease 37.6
Diagnosed Diabetes 19.9
Life Expectancy at Birth 33.6
Cognitively Disabled 35.0
Physically Disabled 18.7
Attachment I.C
Agenda Page 226

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 28 / 30
Heart Attack ER Admissions 41.1
Mental Health Not Good 39.0
Chronic Kidney Disease 14.8
Obesity 30.3
Pedestrian Injuries 88.0
Physical Health Not Good 27.6
Stroke 22.5
Health Risk Behaviors —
Binge Drinking 61.9
Current Smoker 48.5
No Leisure Time for Physical Activity 31.5
Climate Change Exposures —
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 77.6
Elderly 27.3
English Speaking 30.7
Foreign-born 64.3
Outdoor Workers 62.2
Climate Change Adaptive Capacity —
Impervious Surface Cover 9.7
Traffic Density 62.7
Traffic Access 60.2
Other Indices —
Hardship 67.4
Other Decision Support —
2016 Voting 15.1
Attachment I.C
Agenda Page 227

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 29 / 30

7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a)79.0
Healthy Places Index Score for Project Location (b)25.0 Project Located in a Designated Disadvantaged Community (Senate Bill 535)No Project Located in a Low-Income Community (Assembly Bill 1550)Yes Project Located in a Community Air Protection Program Community (Assembly Bill 617)No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

7.4. Health & Equity Measures
No Health & Equity Measures selected.

7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.

7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.

8. User Changes to Default Data
Screen Justification
Construction: Construction Phases Building Construction, Paving, and Architectural Coating overlap to present a conservative analysis Construction: Off-Road Equipment T/L/B replaced with Crawler Tractor to accurately calculate disturbance for Site Preparation and Grading phases. Standard 8 hours work days.

Construction: Architectural Coatings SCAQMD Rule 1113
Operations: Vehicle Data Trip characteristics based on information provided in the Trip Generation assessment.

Operations: Architectural Coatings SCAQMD Rule 1113
Attachment I.C
Agenda Page 228

15985 - YMCA Downey (Existing) Detailed Report, 5/1/2024 30 / 30
Operations: Refrigerants As of 1 January 2022, new commercial refrigeration equipment may not use refrigerants with a GWP of 150 or greater. Further, R-404A (the CalEEMod default) is unacceptable for new supermarket and cold storage systems as of 1 January 2019 and 2023, respectively.

Beginning 1 January 2025, all new air conditioning equipment may not use refrigerants with a GWP of 750 or greater.

Land Use Taken from client provided data.

Operations: Fleet Mix Passenger Car Mix estimated based on CalEEMod default fleet mix and the ratio of the vehicle classes (LDA, LDT1, LDT2, MDV, MCY). Truck Fleet Mix based on 2 and 3 axle trucks Attachment I.C
Agenda Page 229

CULTURAL RESOURCES STUDY FOR

THE YMCA DOWNEY PROJECT

CITY OF DOWNEY,

LOS ANGELES COUNTY, CALIFORNIA
APNs 6255-013-032, -033, and -034
Lead Agency:

City of Downey
11111 Brookshire Avenue
Downey, California 90241
Preparer:

BFSA Environmental Services,
a Perennial Company
14010 Poway Road, Suite A
Poway, California 92064
Project Proponent:

T&B Planning, Inc.
3200 El Camino Real, Suite 100
Irvine, California 92602
May 8, 2024
Attachment I.D
Agenda Page 230

Cultural Resources Study for the YMCA Downey Project
i
Archaeological Database Information

Author: Fabian Diaz Luevano, M.Arch., and Andrew J. Garrison M.A., RPA

Consulting Firm: BFSA Environmental Services,
a Perennial Company
14010 Poway Road, Suite A
Poway, California 92064
(858) 484-0915

Client/Project Proponent: T&B Planning, Inc.
3200 El Camino Real, Suite 100
Irvine, California 92602

Report Date: May 8, 2024

Report Title: Cultural Resources Study for the YMCA Downey Project, City of Downey, Los Angeles County, California

Type of Study: Phase I Cultural Resources Survey and Historic Structure Evaluation

USGS Quadrangle: Unsectioned former Santa Gertrudes (McFarland and Downey) Rancho, Township 3 South, Range 12 West of the South Gate, California (7.5-minute) USGS Quadrangle

Acreage: 2.16 acres

Key Words: Survey; 1963 YMCA recreational building at 11531 Downey Avenue (P-19-190639); 1965 commercial/office building at 11525 Downey Avenue (Temp-1); 1947 to 1950 single-family residence with detached garage at 8268 Arnett Street (Temp-2); monitoring of grading is recommended; historic buildings not significant and preservation not recommended.

Attachment I.D
Agenda Page 231

Cultural Resources Study for the YMCA Downey Project
ii
Table of Contents

Section Description Page

MANAGEMENT SUMMARY/ABSTRACT ......................................................................... v

1.0 INTRODUCTION ...................................................................................................1.0–1

1.1 Project Description............................................................................................1.0–1

1.2 Environmental Setting ......................................................................................1.0–1

1.3 Cultural Setting .................................................................................................1.0–5

1.4 Results of the Archaeological Records Search .................................................1.0–19

1.5 Applicable Regulations .....................................................................................1.0–23

1.5.1 California Environmental Quality Act .....................................................1.0–23

2.0 RESEARCH DESIGN .............................................................................................2.0–1

3.0 ANALYSIS OF PROJECT EFFECTS ....................................................................3.0–1

3.1 Survey Methods ................................................................................................3.0–1

3.2 Results of the Field Survey ...............................................................................3.0–1

3.3 Historic Structure Analysis ...............................................................................3.0–5

3.3.1 History of the Property: Ownership and Development ...........................3.0–5

3.3.2 Description of Surveyed Resources .........................................................3.0–7

3.3.3 Significance Evaluation ...........................................................................3.0–27

3.4 Discussion/Summary ........................................................................................3.0–48

4.0 INTERPRETATION OF RESOURCE IMPORTANCE AND IMPACT
IDENTIFICATION..................................................................................................4.0–1

4.1 Resource Importance ........................................................................................4.0–1

4.2 Impact Identification .........................................................................................4.0–1

5.0 RECOMMENDATIONS .........................................................................................5.0–1

6.0 LIST OF PREPARERS AND ORGANIZATIONS CONTACTED .......................6.0–1

7.0 REFERENCES CITED ............................................................................................7.0–1

List of Appendices

Appendix A – Resumes of Key Personnel
Appendix B – Site Record Forms*
Appendix C – Archaeological Records Search Results*
Appendix D – NAHC Sacred Lands File Search Results*
*Deleted for public review and bound separately in the Confidential Appendix

Attachment I.D
Agenda Page 232

Cultural Resources Study for the YMCA Downey Project
iii
List of Figures

Figure Description Page

Figure 1.1–1 General Location Map ..................................................................................1.0–2 Figure 1.1–2 Project Location Map (USGS) .....................................................................1.0–3 Figure 1.1–3 Project Development Map ............................................................................1.0–4 Figure 3.2–1 Cultural Resource Location Map..................................................................3.0–3 Figure 3.2–2 Cultural Resource Locations Shown on Aerial Photograph .........................3.0–4

List of Plates

Plate Description Page

Plate 1.4–1 1928 Aerial Photograph ..................................................................................1.0–15 Plate 1.4–2 1947 Aerial Photograph ..................................................................................1.0–16 Plate 1.4–3 1952 Aerial Photograph ..................................................................................1.0–17 Plate 1.4–4 1963 Aerial Photograph ..................................................................................1.0–18 Plate 1.4–5 1968 Aerial Photograph ..................................................................................1.0–19 Plate 1.4–6 1976 Aerial Photograph ..................................................................................1.0–20 Plate 1.4–7 1982 Aerial Photograph ..................................................................................1.0–21 Plate 1.4–8 Current Aerial Photograph ..............................................................................1.0–22 Plate 3.2–1 Overview of the subject property, facing southwest .......................................3.0–2 Plate 3.2–2 Overview of the project, facing north .............................................................3.0–2 Plate 3.3–1 Northeast façade of the 8268 Arnett Street Residence, Facing Southwest .....3.0–9 Plate 3.3–2 Northeast (Left) and Northwest (Right) Façades of the 8268 Arnett Street Residence, Facing South .................................................................................3.0–10 Plate 3.3–3 Northeast Façade of the 8268 Arnett Street Residence, Facing Southwest ....3.0–11 Plate 3.3–4 Southeast (Left) and Northeast (Right) Façades of the 8268 Arnett Street Residence, Facing West ..................................................................................3.0–12 Plate 3.3–5 Northeast (Left) and Northwest (Right) Façades of the 8268 Arnett Street Residence and Northeast Façade of the Detached Garage, Facing South ......3.0–14 Plate 3.3–6 Northeast (Left) and Northwest (Right) Façades of the 8268 Arnett Street Residence and Northeast Façade of the Detached Garage, Facing Southwest ........................................................................................................3.0–15 Plate 3.3–7 Southeast Façade of the 11525 Downey Avenue Building, Facing Northwest ........................................................................................................3.0–16 Plate 3.3–8 Southeast (Left) and Northeast (Right) Façades of the 11525 Downey Avenue Building, Facing West .......................................................................3.0–17 Attachment I.D
Agenda Page 233

Cultural Resources Study for the YMCA Downey Project
iv

List of Plates (continued)

Plate Description Page

Plate 3.3–9 Southeast Façade of the 11525 Downey Avenue Building, Facing Northwest ........................................................................................................3.0–19 Plate 3.3–10 Northeast Façade of the 11525 Downey Avenue Building, Facing Southwest ........................................................................................................3.0–20 Plate 3.3–11 Northeast (Left) and Northwest (Right) Façades of the 11525 Downey Avenue Building, Facing South ......................................................................3.0–21 Plate 3.3–12 2022 View of the Southwest (Left) and Southeast (Right) Façades of the 11525 Downey Avenue Building, Facing North ............................................3.0–22 Plate 3.3–13 Southeast Façade of the 11531 Downey Avenue Building, Facing North .....3.0–24 Plate 3.3–14 Overview of the 11531 Downey Avenue Property, Facing North..................3.0–25 Plate 3.3–15 Southeast Façade of the 11531 Downey Avenue Building, Facing West ......3.0–26 Plate 3.3–16 2022 View of the Southeast Façade of the 1970s Addition to the 11531 Downey Avenue Building, Facing Northwest ................................................3.0–28 Plate 3.3–17 Southeast Façade of the 1970s Addition (Right) to the 11531 Downey Avenue Building, Facing West .......................................................................3.0–29 Plate 3.3–18 2019 View of the Northwest Façade of the 11531 Downey Avenue Building, Facing Southeast .............................................................................3.0–30 Plate 3.3–19 Southwest Façade of the 11531 Downey Avenue Building, Facing North ....3.0–31 Plate 3.3–20 Two-Story Portion of the Southwest Façade of the 11531 Downey Avenue Building, Facing Northeast .............................................................................3.0–32 Plate 3.3–21 Single-Story Portion of the Southwest Façade of the 11531 Downey Avenue Building, Showing the Roof Overhang and Metal Door, Facing Northeast .........................................................................................................3.0–33

List of Tables

Table Description Page

Table 1.4–1 Cultural Resources Located Within One Mile of the Project .........................1.0–13 Table 3.3–1 Individuals Listed at 8268 Arnett Street .........................................................3.0–6

Attachment I.D
Agenda Page 234

Cultural Resources Study for the YMCA Downey Project
v

MANAGEMENT SUMMARY/ABSTRACT

In response to a request from the applicant, a cultural resources study was conducted by BFSA Environmental, a Perennial Company (BFSA), for the proposed YMCA Downey Project.

The proposed 2.16-acre project is located southwest of the intersection of Downey Avenue and Arnett Street and includes 11531 Downey Avenue, 11525 Downey Avenue, and 8268 Arnett Street, in the city of Downey, Los Angeles County, California (Assessor’s Parcel Numbers [APNs] 6255-013-032, -033, and -034). The project is situated within the unsectioned former Santa Gertrudes (McFarland and Downey) Rancho, Township 3 South, Range 12 West, as shown on the U.S. Geological Survey (USGS) South Gate, California Quadrangle. Currently, the property contains four historic buildings including the YMCA recreational building at 11531 Downey Avenue (built 1963), one commercial/office building at 11525 Downey Avenue (built 1965), and one single-family residence with a detached garage at 8268 Arnett Street (built between 1947 and 1950). As proposed, the project plans to clear most of the property for the development of a newly designed YMCA campus. The project proposes to demolish the buildings at 11525 Downey Avenue and 8268 Arnett Street. Likewise, most of the current YMCA recreational building at 11531 Downey Avenue will be demolished; however, approximately 7,625 square feet of the building will remain and be retrofitted.

The purpose of this investigation was to locate and record any cultural resources within the project and subsequently evaluate any resources as part of the City of Downey environmental review process conducted in compliance with the California Environmental Quality Act (CEQA).

The archaeological investigation of the project also includes the review of an archaeological records search performed at the South Central Coastal Information Center (SCCIC) at California State University, Fullerton (CSU Fullerton), in order to assess previous archaeological studies and identify any previously recorded archaeological sites within the project or in the immediate vicinity. According to the records search results, eight resources (all historic) have been recorded within one mile of the project, one of which (P-19-190639) is recorded within the subject property.

Site P-19-190639 is the YMCA recreational building at 11531 Downey Avenue. The building was recorded and evaluated by K.A. Crawford of Michael Brandman Associates in 2013.

Crawford concluded that the design, materials, and workmanship of the structure had been altered by a major addition to the northern portion of the building in the late 1970s. Subsequently, Crawford evaluated the building as not eligible for the National Register of Historic Places (NRHP).

A Sacred Lands File (SLF) search was also requested from the Native American Heritage Commission (NAHC). The search was returned with negative results for any recorded Native American sacred sites or locations of religious or ceremonial importance within the project vicinity.

BFSA staff archaeologist Mary Chitjian conducted the cultural resources survey of the YMCA Downey Project on April 15, 2024. The survey was an intensive reconnaissance consisting of a series of survey transects across the project. While the entire project was accessible, ground Attachment I.D
Agenda Page 235

Cultural Resources Study for the YMCA Downey Project
vi
surface visibility was poor as the subject property is entirely developed containing the YMCA recreational building at 11531 Downey Avenue, a commercial/office building at 11525 Downey Avenue, one single-family residence with a detached garage at 8268 Arnett Street, along with associated hardscape and landscaping. No archaeological resources were identified during the survey. However, the buidings and structures within the project boundaries were constructed between 1947 and 1965 and, therefore, meet the age threshold under the National Register (36 CFR [Code of Federal Regulations] 60.4) and the California Code of Regulations (CCR § 4852) to require evaluations of potential eligibility to the California Register of Historical Resources (CRHR). Because the historic buildings and structures will be impacted by development, the evaluation of the buildings is required to address potentially significant impacts to potential historical resources. The structures were evaluated by BFSA as part of this study.

While the buildings and structures within the property meet the 50-year age threshold for evaluation, they are evaluated as not eligible for the CRHR. None of the properties are associated with significant individuals, significant architectural examples, or are able to provide more information regarding the history of Downey or the state of California. Because the buildings located at 8268 Arnett Street and 11525 and 11531 Downey Avenue are not eligible for listing on the CRHR, no site-specific mitigation measures are required for any future alterations or planned demolition of the buildings.

Although the historic buildings were evaluated as not CEQA-significant, the potential exists that unidentified cultural resources may be present that are related to the historic use of the area since prior to 1928. Based upon this potential, monitoring of grading is recommended to prevent the inadvertent destruction of any potentially important cultural deposits that were not observed or detected during the current cultural resources study. Should potentially significant cultural deposits be discovered, mitigation measures should be implemented to reduce the effects of the grading impacts. If prehistoric cultural resources are discovered, Native American monitoring would be required for all subsequent earthwork for the project. As a part of this study, a copy of this report will be submitted to the SCCIC at CSU Fullerton. Qualifications of key BFSA staff involved in the preparation of this report can be found within Appendix A.

Attachment I.D
Agenda Page 236

Cultural Resources Study for the YMCA Downey Project

1.0–1

1.0 INTRODUCTION

1.1 Project Description
The cultural resources study program for the YMCA Downey Project was conducted in order to comply with CEQA and City of Downey environmental compliance procedures. The

2.16-acre project is located southwest of the intersection of Downey Avenue and Arnett Street and includes 11531 Downey Avenue, 11525 Downey Avenue, and 8268 Arnett Street, in the city of Downey, Los Angeles County, California (APNs 6255-013-032, -033, and -034) (Figure 1.1–1).

The project is situated within the unsectioned former Santa Gertrudes (McFarland and Downey) Rancho, Township 3 South, Range 12 West, as shown on the USGS South Gate, California Quadrangle (Figure 1.1–2). Currently, the property contains four historic buildings, including the YMCA recreational building at 11531 Downey Avenue (built 1963), one commercial/office building at 11525 Downey Avenue (built 1965), and one single-family residence with a detached garage at 8268 Arnett Street (built between 1947 and 1950). As proposed, the project plans to clear most of the property for the development of a newly designed YMCA campus. The project proposes to demolish the buildings at 11525 Downey Avenue and 8268 Arnett Street. Likewise, most of the current YMCA building at 11531 Downey Avenue will be demolished; however, approximately 7,625 square feet of the building will remain and be retrofitted (Figure 1.1–3).

The decision to request this investigation was based upon cultural resource sensitivity of the locality as suggested by known site density and predictive modeling. Sensitivity for cultural resources in a given area is usually indicated by known settlement patterns, which, in southeastern Los Angeles County, were focused around freshwater resources and a food supply.

1.2 Environmental Setting
The YMCA Downey Project is generally located in southeastern Los Angeles County in the city of Downey. Geologically, the project is located within the Central Basin of the larger Los Angeles Basin, a large structural sedimentary basin bounded and cut through by several active fault systems in the Los Angeles metropolitan area (Hillhouse et al. 2002). As mapped by Saucedo et al. (2016), the project is underlain by undivided sandy, Holocene-aged young alluvium. The specific soil types found within the property are characterized as Urban land-Hueneme, drained- San Emigdio complex (NRCS 2019).

Currently, the subject property is fully developed containing the YMCA recreational building at 11531 Downey Avenue (built 1963), one commercial/office building at 11525 Downey Avenue (built 1965), one single-family residence with a detached garage at 8268 Arnett Street (built between 1947 and 1950), along with associated parking, hardscape, and landscaping.

Historically, many of the water sources in this area have been channelized, such as the Los Angeles and the San Gabriel rivers, which are situated approximately two miles west and one-and-one-half miles east, respectively, of the subject property.

Attachment I.D
Agenda Page 237

Figure 1.1–1
General Location Map
The YMCA Downey Project
ESRI Street Map

1.0 –2
Attachment I.D
Agenda Page 238

Figure 1.1–2
Project Location Map
The YMCA Downey Project
USGS South Gate and Whittier Quadrangles (7.5-minute series)

1.0 –3
Attachment I.D
Agenda Page 239

Figure 1.1–3
Project Development Map
The YMCA Downey Project1.0–4Legend
Project boundary
Structure to remain
Structure to be demolished
Attachment I.D
Agenda Page 240

Cultural Resources Study for the YMCA Downey Project

1.0–5

1.3 Cultural Setting
The oldest directly dated human remains from coastal southern California are those of the “Los Angeles Man.” These remains were dated to 26,000 years before the present (YBP) using amino acid racemization and radiocarbon techniques; however, later dates using the more reliable accelerator mass spectrometry method determined that that date was exaggerated (Altschul and Grenda 2002). Evidence of early Holocene occupation along the southern California coast and islands has been increasing, including the Arlington Springs Site on Santa Rosa Island, the Arlington Springs and Daisy Cave Site on San Miguel Island, and Eel Point on San Clemente Island (Altschul and Grenda 2002). These sites appear to suggest an early Holocene migration southward along the coast. The fact that these early sites are present on the islands, but have yet to be found on the coast, lends support for the view that rising sea levels have probably destroyed early Holocene coastal sites. This period covers Wallace’s Period I or Early Man cultural sequences (Moratto 1984).

Due to a rapid and prolonged rise in sea level during the early Holocene, between 10,000 and 6,000 YBP, many archaeological sites associated with this early period along coastal southern California were probably destroyed or obscured by sea level advancement or sedimentation (Carbone 1991). The increase in sea levels probably forced a shift from rocky shore resources (shellfish) to estuarine and lagoon resources with a more varied economy, including marine, avian, and terrestrial species (Carbone 1991). The natural history of the Ballona Wetlands has been constructed based upon stratigraphic analysis (Altschul and Grenda 2002). The results suggest that after sea levels stabilized around 7,000 YBP, a variety of depositional environments were created that reshaped the landscape on which inhabitants were living. By 6,200 YBP, a spit of sand migrated across the mouth of the coastal inlet, creating a shallow lagoon; this area appears to have been visited by Native Americans at about this time (Altschul and Grenda 2002). As sedimentation increased, the lagoon gradually decreased in size. Because tidal waters were blocked, the lagoon shifted from marine to fresh water. As the lagoon gradually turned into tidal marshes and estuarine environments became well established, habitation along the edges of the water source increased. Based upon archaeological evidence, permanent occupation in the area appears to have occurred by 3,000 years ago and lasted until the Protohistoric Period (Altschul and Grenda 2002).

Human adaptations during the middle Holocene (circa 8,000 to 5,000 YBP) in the Los Angeles Basin are characterized by an abundance of grinding implements (specifically manos and metates). Rising sea levels began to stabilize and temperatures reached a thermal optimum at about 6,800 YBP (Altschul and Grenda 2002). Archaeological sites dating to this period tend to be located in grasslands and sagebrush communities on elevated landforms some distance from the shore (Altschul and Grenda 2002). Other characteristics of this period include stone ornaments, large projectile points, and charm stones, while bone and shell tools, ornamentation, and trade items are rare. Sites from this period appear to have consisted of semisedentary settlements with populations ranging from 15 to 100 people, primarily located in the coastal zone and along interior drainages. During this time, the Ballona region was first occupied (Altschul and Attachment I.D
Agenda Page 241

Cultural Resources Study for the YMCA Downey Project

1.0–6
Grenda 2002). This period covers Warren’s Encinitas Tradition and Wallace’s Period II (or Milling Stone Horizon) cultural sequences (Moratto 1984). The later date given for the Milling Stone Horizon varies to as late as 3,000 YBP. The lack of trade items such as obsidian and steatite are often used to attribute a site to this period.

A shift appears to have occurred in the later part of the middle Holocene, between 5,000 and 3,350 YBP (Altschul and Grenda 2002). Mortars and pestles were more common, which suggests that acorns were being exploited as an important part of the prehistoric diet in southern California. Other characteristics of this period include variations of large stemmed, leaf-shaped, and side-notched points, basket-hopper mortars, a variety of stone tools, bone tools, and shell ornamentation. This period corresponds to Warren’s (1968) Campbell Tradition and Wallace’s (1955, 1978) Period III, or Intermediate Horizon; however, the ending date for these periods varies to as late as approximately 1,000 YBP (Moratto 1984). There appears to have been a general shift from a plant-based economy to one that was more diversified, being a generalized hunting/fishing/gathering adaptation, possibly in response to Altithermal conditions (8,000 to 3,000 YBP) (Altschul and Grenda 2002). Evidence suggests that coastal populations placed an understandable emphasis upon marine resources, while the focus of inland occupation was upon hunting land mammals. Trade goods became more common during this period, suggesting intensified regional economic exchange and interaction. Finally, villages appear to have been more permanent during the Intermediate Horizon, closely resembling the later settlement pattern of the region (Altschul and Grenda 2002). By 3,000 YBP, the Ballona region to the north was intensively and relatively permanently occupied. Some researchers suggest that the increasing population density during the late to middle Holocene did not necessarily grow out of the local population, but was a result of a desert migration, perhaps as early as 3,000 YBP (Altschul and Grenda 2002).

During the late Holocene, population size and density increased dramatically, calling for an even more diversified economy (Altschul and Grenda 2002). This period is Wallace’s Period IV, or Late Horizon. Ethnographic data, the first of which was from Spanish explorers and missionaries, indicates that the Gabrielino (Tongva) were the major tribe established in the project area. The Spanish attributed this name to the Native Americans in the area served by the San Gabriel Mission. Gabrielino territory included the watersheds of the San Gabriel, Santa Ana, and Los Angeles rivers, portions of the Santa Monica and Santa Ana mountains, the Los Angeles basin, the coast from Aliso Creek to Topanga Creek, and the San Clemente, San Nicolas, and Santa Catalina islands (Moratto 1984). The Gabrielino spoke a Cupan language that was part of the Shoshonean or Takic family of Uto-Aztecan linguistic stock; these linguistic ties united a disperse ethnic group occupying 1,500 square miles in the Los Angeles basin region (Altschul and Grenda 2002). Interestingly, this language stock was different from that of the Chumash to the north in the Santa Barbara region, as well as from the Kumeyaay (Tipai and Ipai) in the San Diego region, both of which spoke languages of the Hokan stock (although using different dialects).

Ethnographic data states that the Gabrielino were hunters and gatherers whose food sources included acorns, seeds, marine mollusks, fish, and mammals; archaeological sites support this data, Attachment I.D
Agenda Page 242

Cultural Resources Study for the YMCA Downey Project

1.0–7
with evidence of hunting, gathering, processing, and storage implements including arrow points, fishhooks, scrapers, grinding stones, and basketry awls (Altschul and Grenda 2002). Santa Catalina Island provided a valuable source of steatite for the Gabrielino, which they quarried and traded to other groups (Heizer and Treganza 1972; Moratto 1984). About 50 to 100 permanent villages are estimated to have been in existence at the time of European contact, most of which were located along lowland rivers and streams and along sheltered areas of the coast (Moratto 1984). Smaller satellite villages and resource extraction sites were located between larger villages.

Village sites contained varying types of structures, including houses, sweathouses, and ceremonial huts (Bean and Smith 1978). Artistic items included shells set in asphaltum, carvings, painting, steatite, and baskets (Moratto 1984). Settlements were often located at the intersection of two or more ecozones, thus increasing the variety of resources that were immediately accessible (Moratto 1984). Offshore fishing and hunting were accomplished with the use of plank boats, while shellfish and birds were collected along the coast. At the time of European contact, the Gabrielino, second only to the Chumash, were the wealthiest, most populous, and most powerful ethnic group in southern California (Bean and Smith 1978; Moratto 1984).

As with other Native American populations in southern California, the arrival of the Spanish drastically changed life for the Gabrielino. Incorporation into the mission system disrupted their culture and changed their subsistence practices (Altschul and Grenda 2002).

Ranchos were established throughout the area, often in major drainages where Native American villages tended to be located. By the early 1800s, Mission San Gabriel had expanded its holdings for grazing to include much of the former Gabrielino territory (Altschul and Grenda 2002).

Eventually, widespread relocation of Native American groups occurred, resulting in further disruption of the native lifeways. With the introduction of Euro-American diseases, the Gabrielino and other groups of southern California experienced drastic population declines. In the early 1860s, a smallpox epidemic nearly wiped out the remaining Gabrielino population (Moratto 1984).

While people of Gabrielino descent still live in the Los Angeles area, the Gabrielino were no longer listed as a culturally identifiable group in the 1900 Federal Census (Bean and Smith 1978; Moratto 1984).

General History of the Los Angeles Area
The historic background of the project area began with the Spanish colonization of Alta California. The first Spanish colonizing expedition reached southern California in 1769 with the intention of converting and civilizing the indigenous populations, as well as expanding the knowledge of and access to new resources in the region (Brigandi 1998). As a result, by the late eighteenth century, a large portion of southern California was overseen by Mission San Luis Rey (San Diego County), Mission San Juan Capistrano (Orange County), and Mission San Gabriel (Los Angeles County), who began colonizing the region and surrounding areas (Chapman 1921).

Up until this time, the only known way to feasibly travel from Sonora to Alta California was by sea. In 1774, Juan Bautista de Anza, an army captain at Tubac, requested and was given permission by the governor of the Mexican State of Sonora to establish a n overland route from Attachment I.D
Agenda Page 243

Cultural Resources Study for the YMCA Downey Project

1.0–8
Sonora to Monterey (Chapman 1921). In doing so, Juan Bautista de Anza passed through Riverside County and described the area in writing for the first time (Caughey 1970; Chapman 1921). In 1797, Father Presidente Lausen (of Mission San Diego de Alcalá), Father Norberto de Santiago, and Corporal Pedro Lisalde (of Mission San Juan Capistrano) led an expedition through southwestern Riverside County in search of a new mission site to establish a presence between San Diego and San Juan Capistrano (Engelhardt 1921). Their efforts ultimately resulted in the establishment of Mission San Luis Rey in Oceanside, California.

On September 8, 1771, Father Pedro Cambón and Father Angel Somera established the Mission San Gabriel de Arcángel near the present-day city of Montebello. In 1775, the mission was moved to its current location in San Gabriel due to better agricultural lands. This mission marked the first sustained European occupation of the Los Angeles County area. Mission San Gabriel, despite a slow start which was partially due to misconduct by Spanish soldiers, eventually became so prosperous that it was known as “The Queen of the Missions” (Johnson et al. 1972).

Each mission gained power through the support of a large, subjugated Native American workforce. As the missions grew, livestock holdings increased and became increasingly vulnerable to theft. In order to protect their interests, the southern California missions began expanding inland to try and provide additional security (Beattie and Beattie 1939; Caughey 1970).

In order to meet their needs, the Spaniards embarked on a formal expedition in 1806 to find potential locations within what is now the San Bernardino Valley. As a result, by 1810, Father Francisco Dumetz of Mission San Gabriel had succeeded in establishing a religious site, or capilla, at a Cahuilla rancheria called Guachama (Beattie and Beattie 1939). San Bernardino Valley received its name from this site, which was dedicated to San Bernardino de Siena by Father Dumetz. The Guachama rancheria was located in present-day Bryn Mawr in San Bernardino County.

These early colonization efforts were followed by establishment of estancias at Puente (circa 1816) and San Bernardino (circa 1819) near Guachama (Beattie and Beattie 1939). These efforts were soon mirrored by Spaniards from Mission San Luis Rey, who in t urn established a presence in what is now Lake Elsinore, Temecula, and Murrieta (Chapman 1921). The indigenous groups who occupied these lands were recruited by missionaries, converted, and put to work in the missions (Pourade 1964). Throughout this period, the Native American populations were decimated by introduced diseases, a drastic shift in diet resulting in poor nutrition, and social conflicts due to the introduction of an entirely new social order (Cook 1976).

The pueblo that eventually became the city of Los Angeles was established in 1781. During this period, Spain also deeded ranchos to prominent citizens and soldiers (though very few in comparison to the later Mexican Period). One such rancho, Rancho San P edro, was deeded to soldier Juan Jose Dominguez in 1784 and comprised 75,000 acres, encompassing the modern South Bay region from the Los Angeles River on the east to the Pacific Ocean on the west.

The area that became Los Angeles County saw an increase in European settlement during the Mexican Period, largely due to the many land grants (ranchos) to Mexican citizens by various governors. The period ended in early January of 1847, when Mexican forces fought the combined Attachment I.D
Agenda Page 244

Cultural Resources Study for the YMCA Downey Project

1.0–9
United States Army and Navy forces in the Battle of the San Gabriel River on January 8, 1847 and the Battle of La Mesa on January 9, 1847 (Nevin 1978). On January 10, 1847, leaders of the pueblo of Los Angeles surrendered peacefully after Mexican General Jose Maria Flores withdrew his forces. Shortly thereafter, newly appointed Mexican Military Commander of California, Andrés Pico, surrendered all of Alta California to United States Army Lieutenant Colonel John C.

Fremont in the Treaty of Cahuenga (Nevin 1978).

Treatment of Native Americans grew worse during the Rancho Period. Most were forced off their land or put to work on the now privately-owned ranchos, most often as slave labor. In light of the brutal ranchos, the degree to which Native Americans had become dependent upon the mission system is evident when, in 1838, a group of Native Americans from Mission San Luis Rey petitioned government officials in San Diego to relieve suffering at the hands of the rancheros:

We have suffered incalculable losses, for some of which we are in part to be blamed for because many of us have abandoned the Mission … We plead and beseech you … to grant us a Rev. Father for this place. We have been accustomed to the Rev.

Fathers and to their manner of managing the duties. We labored under their intelligent directions, and we were obedient to the Fathers according to the regulations, because we considered it as good for us. (Brigandi 1998:21)

Native American culture had been disrupted to the point where they could no longer rely upon prehistoric subsistence and social patterns. Not only does this illustrate how dependent the Native Americans had become upon the missionaries, but also indicates a marked contrast in the way the Spanish treated the Native Americans compared to the Mexican and United States ranchers. Spanish colonialism (missions) is based upon utilizing human resources while integrating them into their society. The Mexican and American ranchers did not accept Native Americans into their social order and used them specifically for the extraction of labor, resources, and profit. Rather than being incorporated, they were either subjugated or exterminated (Cook 1976).

Settlement of the Los Angeles region accelerated during the early American Period. The county was established on February 18, 1850. It was one of 27 counties established in the months prior to California becoming a state. Many ranchos in the county were sold or otherwise acquired by Americans, and most were subdivided into agricultural parcels or towns. Nonetheless, ranching retained its importance, and by the late 1860s, Los Angeles was one of the top dairy production centers in the country (Rolle 1963). In 1854, the United States Congress agreed to let San Pedro become an official port of entry, and by the 1880s, the railroads had established networks throughout the county, resulting in fast and affordable shipment of goods, as well as a means to transport new residents to the booming region (Dumke 1944). New residents included many health-seekers drawn to the area by the fabled climate in the 1870s to the 1880s (Baur 1959). In 1876, the county had a population of 30,000 (Dumke 1944:7); by 1900, it had reached 100,000.

In the early to mid-1900s, population growth accelerated due to industry associated with Attachment I.D
Agenda Page 245

Cultural Resources Study for the YMCA Downey Project

1.0–10
both world wars, as well as emigration from the Midwest “dust bowl” states during the Great Depression. The county became one of the most densely occupied areas in the United States. The county’s mild climate and successful economy continued to draw new residents in the late 1900s, and much of the county transformed from ranches and farms into residential subdivisions surrounding commercial and industrial centers. Hollywood’s development into the entertainment capital of the world and southern California’s booming aerospace industry were key factors in the county’s growth.

Brief History of Downey
The project is located within the former Rancho Santa Gertrudes, which was subdivided from the original Land Grant of Rancho Los Nietos. Governor Pedro Fages awarded a large land grant to Corporal José Manuel Nieto. At first it was called La Zanja, but later it was known simply as Rancho Los Nietos. The Rancho was one of the largest granted and encompassed approximately 300,000 acres, spanning from Puente Hills to the Pacific Ocean. After Nieto passed away in 1834, the Rancho was subdivided by his heirs into five smaller ranchos, which included Las Bolsas, Los Alamitos, Los Cerritos, Los Coyotes, and Santa Gertrudes. Rancho Santa Gertrudes was passed to Josefa Cota, the widow of Antonio Maria Nieto, son of Manuel Nieto. Lemuel Carpenter bought the Rancho from Josefa Cota in 1843, Capenter was married to Cota’s niece. Later, Carpenter ended up in debt to John G. Downey and committed suicide in 1859. The rancho was the sold at auction to Downey and James P. McFarland (Santa Fe Springs Library n.d.).

John Downey was an Irish Immigrant who traveled to California from the east coast in search of gold. Downey was governor of California between 1860 and 1862. At the end of his gubernatorial term, he returned to Los Angeles. In 1865, Downey began subdividing Rancho Santa Gertrudes into small farm lots (City of Downey n.d.):

Governor Downey’s acquisition of this rancho marked a shift in the primary use of the area. Rancho Gertrudes had been open cattle range; it was now put to the plow, and an agricultural/citrus started that was to prosper for almost ninety years. John Downey divided the land into agricultural plots and new residents fleeing the ravages of the Civil War developed a community. By 1873, the Southern Pacific Railroad built a line to this area between two settled areas called Gallatin and College Settlement and laid the foundations for a future city which marked a new era of prosperity for what became known as Downey City.

The Downey area grew in sporadic leaps. The California Goldrush, the Civil War, World War I; each event brought new residents to the town. The Second World War laid the foundation for establishing a strong aviation industry in Downey; and by the 1950’s this industry had become a significant economic factor for Downey.

Attachment I.D
Agenda Page 246

Cultural Resources Study for the YMCA Downey Project

1.0–11
On December 17, 1956 the community of Downey, having a population of approximately 90,000 people living within an area of 11.5 square miles, and located 12 miles southeast of the City of Los Angeles, jointed the rapidly swelling ranks of California cities to become the 50th incorporated city in Los Angeles County. By an overwhelming mandate, the citizens of Downey voted for a Council-Manager form of government to run their community – the largest in population ever known to have incorporated in the United States. At that time, Downey had an assessed value of about $100,000,000 and consisted of some of the finest new homes in Southeastern Los Angeles County and 110 industrial firms, employing over 21,000 persons on a $75,713,000 budget. (City of Downey n.d.)

Downey YMCA
The Young Men’s Christian Association (YMCA), at times referred to as the Y, was founded in London on June 6, 1844, by George Williams:

George Williams, born on a farm in 1821, came to London 20 years later as a sales assistant in a draper’s shop, a forerunner of today's department store. He and a group of fellow drapers organized the first YMCA to substitute Bible study and prayer for life on the streets. By 1851 there were 24 Ys in Great Britain, with a combined membership of 2,700. That same year the Y arrived in North America:

It was established in Montreal on November 25, and in Boston on December 29. (Marshfield Clinic Health System YMCA 2024)

The YMCA grew throughout the country during the late nineteenth century and early twentieth century. During the late 1930s, Harold Wagner, a YMCA executive for the Los Angeles area, approached Hubert Noble, a college instructor and pastor of the First Presbyterian Church of Downey, about the possibilities of opening a facility within the city of Downey. Noble opened the basement of the church to serve as the first YMCA location in Downey (Brown 2011).

With just two small basement rooms at its disposal, the Downey YMCA, first incorporated as an extension of the Y branch in Huntington Park, began establishing clubs for grade school boys around town.

By April 29, 1941, plans for a permanent facility were initiated after a group of 29 men and women met in the church basement to discuss the future of the Y in Downey. Their expansion plan estimated that a Downey branch would cost nearly $5000 a year to operate, but nonetheless, the founding members, many of whom were parents, banded together and began the development process.

Attachment I.D
Agenda Page 247

Cultural Resources Study for the YMCA Downey Project

1.0–12
The Y’s first office was in the old Downey Paint Center. Later, the small office was moved to the second floor of the Masonic Temple at Third Street and Downey Avenue. By 1947, the new board members had acquired a make-shift office and club room building on the corner of Second and Myrtle streets purchased from Downey’s first mayor, James L. Stamps. (Brown 2011)

City directories indicate that the Mrytle location was located at 11016 Myrtle Street, situated just under one-half mile north of the current location of 11531 Downey Avenue. Although Pierce describes the location as “a make-shift office and club room building,” newspaper accounts from 1964 indicate the building originally served as a Navy mess hall during World War II (Press Telegram 1964).

In 1955, the organization acquired the 11531 Downey Avenue property. Based on a Chain of Title (COT) inquiry, the property was originally three parcels, with one parcel being acquired from William Ward Altig and Marie Shelter Altig, and the remaining two parcels acquired from John W. Ezzell and Florence V. Ezzell. No records could be found to indicate whether the Ezzell’s actually resided within the property. Conversely, the Altigs did live at the property, and it is evident the property was the most notable of those acquired. William Altig was a doctor and had a large three-story colonial home with a tennis court, horse stables, swimming pool, and other amenities. The property “was considered the showplace of Downey homes at that time” (Brown 2011). The YMCA purchased Altig’s property for $67,000 in August of 1955 (Brown 2011).

Soon after the purchase, the Y moved its offices from Second and Myrtle to the Altig mansion, which underwent some minor alterations in order to provide meeting rooms for the expanding Y clubs. Following the transition, Stamps donated the old YMCA property to the Arc of Southeast Los Angeles County to help establish its first office in 1956. (Brown 2011)

Demand for more space at the new YMCA led to a campaign to raise funds for an expansion of the facility in 1962. In 1963, the architectural firm of Roy Donley & Associates were contracted to design a new facility estimated to cost $371,000 (Press Telegram 1964). Ultimately, the new 20,000-square foot YMCA facility, constructed next to the Altig residence, cost $432,000 and was dedicated in September of 1963 (Brown 2011).

The continued growth of the region during the mid-twentieth century led to a desire to expand the YMCA facility and a new fundraising campaign to raise 2.25 million dollars took place from the fall of 1973 through the spring of 1974 (Brown 2011). This expansion led to the demolition of the Altig residence in January of 1976 to expand the YMCA facility to the 44,000- square foot building now found at 11531 Downey Avenue

Attachment I.D
Agenda Page 248

Cultural Resources Study for the YMCA Downey Project

1.0–13

1.4 Results of the Archaeological Records Search
An archaeological records search for a one-mile radius around the project was conducted by BFSA at the SCCIC at CSU Fullerton. According to the records search results, eight resources (all historic) have been recorded within one mile of the project, one of which (P-19-190639) is recorded within the subject property. Site P-19-190639 is the YMCA recreational building at 11531 Downey Avenue. The building was recorded and evaluated by K.A. Crawford of Micha el Brandman Associates in 2013. Crawford concluded that the design, materials, and workmanship of the structure had been altered by a major addition to the northern portion of the building in the 1970s. Subsequently, Crawford evaluated the building as not eligible for the NRHP. Table 1.4– 1 provides descriptions for all resources identified during the SCCIC search.

Table 1.4–1
Cultural Resources Located Within One Mile of the Project

Site(s) Description
P-19-004777 Historic trash scatter
P-19-177345 Historic residence
P-19-186110 Historic railroad alignment
P-19-186743 Historic multi-family and commercial property P-19-187876 Historic commercial property
P-19-188775 Historic industrial building
P-19-189815 Historic church
P-19-190639* Historic Downey YMCA
* Located within the subject property

The records search also identified 16 cultural resources studies which have previously been conducted within one mile of the project, one of which, conducted by Michael Brandman Associates, overlaps the subject property (Bonner et al. 2013). The 2013 study was conducted in support of the updating of cell phone signal towers located on top of the YMCA recreational building and included the formal recordation and evaluation of P-19-190639. The full records search results are included in Appendix C.

In addition, BFSA reviewed the following historic sources:

• The NRHP Index
• The Office of Historic Preservation (OHP), Archaeological Determinations of Eligibility
• The OHP, Built Environment Resources Directory
• 1899 Downey (15-minute) USGS map
Attachment I.D
Agenda Page 249

Cultural Resources Study for the YMCA Downey Project

1.0–14
• 1923 Bell and 1964 South Gate (7.5-minute) USGS maps
• Aerial photographs (1928 through 2023)

The historic maps depict buildings within the project vicinity as early as 1899. Based on the aerial photographs (Plates 1.4–1 through 1.4–8), in 1928, the subject property and surrounding area consisted of rural residential and single-family agricultural properties. Although county assessors’ records show the 8268 Arnett Street residence was constructed in 1947, an aerial photograph from June 18, 1947, shows that at that time, the residence still had not been constructed. Regardless, by 1952, much of the surrounding area had been developed for residential and commercial use and the 8268 Arnett Street residence with detached garage is visible. The next available photograph, from 1963, shows the construction of the YMCA recreational building. At that time, the building footprint appears similar to the portion of the building which current plans indicate will remain intact and be retrofitted. However, it is likely the photograph was taken during the process of construction in 1963, as by 1968, the building is an “L”-shaped structure. The 1968 aerial also depicts the commercial/office building at 11525 Downey Avenue. Little change is evident on the 1976 aerial; however, in 1982, the large addition to the north of the YMCA recreational building, noted by Crawford, is visible. Subsequent photographs do not show any major changes noticeable at the scale of the imagery.

BFSA also requested a SLF search from the NAHC, which was negative for the presence of any recorded Native American sacred sites or locations of religious or ceremonial importance within one mile of the project. All correspondence is provided in Appendix D.

Attachment I.D
Agenda Page 250

1.0–15
Figure 1.4–1
1928 Aerial Photograph
The YMCA Downey Project
Legend
Project boundary
Attachment I.D
Agenda Page 251

1.0–16
Figure 1.4–2
1947 Aerial Photograph
The YMCA Downey Project
Legend
Project boundary
Attachment I.D
Agenda Page 252

1.0–17
Figure 1.4–3
1952 Aerial Photograph
The YMCA Downey Project
Legend
Project boundary
Attachment I.D
Agenda Page 253

1.0–18
Figure 1.4–4
1963 Aerial Photograph
The YMCA Downey Project
Legend
Project boundary
Attachment I.D
Agenda Page 254

1.0–19
Figure 1.4–5
1968 Aerial Photograph
The YMCA Downey Project
Legend
Project boundary
Attachment I.D
Agenda Page 255

1.0–20
Figure 1.4–6
1976 Aerial Photograph
The YMCA Downey Project
Legend
Project boundary
Attachment I.D
Agenda Page 256

1.0–21
Figure 1.4–7
1982 Aerial Photograph
The YMCA Downey Project
Legend
Project boundary
Attachment I.D
Agenda Page 257

1.0–22
Figure 1.4–8
Current Aerial Photograph
The YMCA Downey Project
Legend
Project boundary
Attachment I.D
Agenda Page 258

Cultural Resources Study for the YMCA Downey Project

1.0–23

1.5 Applicable Regulations
Resource importance is assigned to districts, sites, buildings, structures, and objects that possess exceptional value or quality illustrating or interpreting the heritage of Los Angeles County in history, architecture, archaeology, engineering, and culture. A number of criteria are used in demonstrating resource importance. Specifically, the criteria outlined in CEQA, provide the guidance for making such a determination. The following sections detail the criteria that a resource must meet in order to be determined important.

1.5.1 California Environmental Quality Act
According to CEQA (§ 15064.5a), the term “historical resource” includes the following:

1) A resource listed in or determined to be eligible by the State Historical Resources Commission for listing in the CRHR (Public Resources Code [PRC] SS5024.1, Title 14 CCR. Section 4850 et seq.).
2) A resource included in a local register of historical resources, as defined in Section 5020.1(k) of the PRC or identified as significant in an historical resource survey, meeting the requirements of Section 5024.1(g) of the PRC, shall be presumed to be historically or culturally significant. Public agencies must treat any such resource as significant unless the preponderance of evidence demonstrates that it is not historically or culturally significant.
3) Any object, building, structure, site, area, place, record, or manuscript, which a lead agency determines to be historically significant or significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California may be considered to be an historical resource, provided the lead agency’s determination is supported by substantial evidence in light of the whole record. Generally, a resource shall be considered by the lead agency to be “historically significant” if the resource meets the criteria for listing on the CRHR (PRC SS5024.1, Title 14, Section 4852) including the following:

a) Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage; b) Is associated with the lives of persons important in our past; c) Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values; or
d) Has yielded, or may be likely to yield, information important in prehistory or history.

Attachment I.D
Agenda Page 259

Cultural Resources Study for the YMCA Downey Project

1.0–24
4) The fact that a resource is not listed in, or determined eligible for listing in the CRHR, not included in a local register of historical resources (pursuant to Section 5020.1[k] of the PRC), or identified in an historical resources survey (meeting the criteria in Section 5024.1[g] of the PRC) does not preclude a lead agency from determining that the resource may be an historical resource as defined in PRC Section 5020.1(j) or 5024.1.

According to CEQA (§ 15064.5b), a project with an effect that may cause a substantial adverse change in the significance of an historical resource is a project that may have a significant effect on the environment. CEQA defines a substantial adverse change as:

1) Substantial adverse change in the significance of an historical resource means physical demolition, destruction, relocation, or alteration of the resource or its immediate surroundings such that the significance of an historical resource would be materially impaired.
2) The significance of an historical resource is materially impaired when a project:

a) Demolishes or materially alters in an adverse manner those physical characteristics of an historical resource that convey its historical significance and that justify its inclusion in, or eligibility for inclusion in the CRHR; or b) Demolishes or materially alters in an adverse manner those physical characteristics that account for its inclusion in a local register of historical resources pursuant to Section 5020.1(k) of the PRC or its identification in an historical resources survey meeting the requirements of Section 5024.1(g) of the PRC, unless the public agency reviewing the effects of the project establishes by a preponderance of evidence that the resource is not historically or culturally significant; or,
c) Demolishes or materially alters in an adverse manner those physical characteristics of an historical resource that convey its historical significance and that justify its eligibility for inclusion in the CRHR as determined by a lead agency for purposes of CEQA.

Section 15064.5(c) of CEQA applies to effects on archaeological sites and contains the following additional provisions regarding archaeological sites:

1) When a project will impact an archaeological site, a lead agency shall first determine whether the site is an historical resource, as defined in subsection (a). 2) If a lead agency determines that the archaeological site is an historical resource, it shall refer to the provisions of Section 21084.1 of the PRC, Section 15126.4 of the guidelines, and the limits contained in Section 21083.2 of the PRC do not apply.

Attachment I.D
Agenda Page 260

Cultural Resources Study for the YMCA Downey Project

1.0–25
3) If an archaeological site does not meet the criteria defined in subsection (a), but does meet the definition of a unique archaeological resource in Section 21083.2 of the PRC, the site shall be treated in accordance with the provisions of Section 21083.2. The time and cost limitations described in PRC Section 21083.2 (c-f) do not apply to surveys and site evaluation activities intended to determine whether the project location contains unique archaeological resources.
4) If an archaeological resource is neither a unique archaeological nor historical resource, the effects of the project on those resources shall not be considered a significant effect on the environment. It shall be sufficient that both the resource and the effect on it are noted in the Initial Study or Environmental Impact Report, if one is prepared to address impacts on other resources, but they need not be considered further in the CEQA process.

Section 15064.5(d) and (e) contain additional provisions regarding human remains.

Regarding Native American human remains, paragraph (d) states:

(d) When an Initial Study identifies the existence of, or the probable likelihood of, Native American human remains within the project, a lead agency shall work with the appropriate Native Americans as identified by the NAHC as provided in PRC SS5097.98. The applicant may develop an agreement for treating or disposing of, with appropriate dignity, the human remains and any items associated with Native American burials with the appropriate Native Americans as identified by the NAHC. Action implementing such an agreement is exempt from:

1) The general prohibition on disinterring, disturbing, or removing human remains from any location other than a dedicated cemetery (Health and Safety Code Section 7050.5).
2) The requirements of CEQA and the Coastal Act.

Attachment I.D
Agenda Page 261

Cultural Resources Study for the YMCA Downey Project

2.0–1

2.0 RESEARCH DESIGN

The primary goal of the research design is to attempt to understand the way in which humans have used the land and resources within the project through time, as well as to aid in the determination of resource significance. For the current project, the study area under investigation is southeastern Los Angeles County. The scope of work for the cultural resources study conducted for the YMCA Downey Project included the survey of a 2.16-acre study area and the assessment of the YMCA recreational building at 11531 Downey Avenue (built 1963), the commercial/office building at 11525 Downey Avenue (built 1965), and the single-family residence with a detached garage at 8268 Arnett Street (built between 1947 and 1950). Given the area involved, the research design for this project was focused upon realistic study options. Since the main objective of the investigation was to identify the presence of and potential impacts to cultural resources, the goal is not necessarily to answer wide-reaching theories regarding the development of early southern California, but to investigate the role and importance of the identified resources. Nevertheless, the assessment of the significance of a resource must take into consideration a variety of characteristics, as well as the ability of the resource to address regional research topics and issues.

Although survey programs are limited in terms of the amount of information available, several specific research questions were developed that could be used to guide the initial investigations of any observed cultural resources:

• Can located cultural resources be associated with a specific time period, population, or individual?
• Do the types of located cultural resources allow a site activity/function to be determined from a preliminary investigation? What are the site activities? What is the site function? What resources were exploited?
• How do the located sites compare to others reported from different surveys conducted in the area?
• How do the located sites fit existing models of settlement and subsistence for the region?

For the historic buildings, the research process was focused upon the built environment and those individuals associated with the ownership, design, and construction of the building.

Although historic structure evaluations are limited in terms of the amount of information available, several specific research questions were developed that could be used to guide the initial investigations of any observed historic resources:

• Can the building be associated with any significant individuals or events? • Is the building representative of a specific type, style, or method of construction? • Is the building associated with any nearby structures? Does the building, when studied with the nearby structures, qualify as a contributor to a potential historic district? Attachment I.D
Agenda Page 262

Cultural Resources Study for the YMCA Downey Project

2.0–2
• Was the building designed or constructed by a significant architect, designer, builder, or contractor?

Data Needs
At the survey level, the principal research objective is a generalized investigation of changing settlement patterns in both the prehistoric and historic periods within the study area. The overall goal is to understand settlement and resource procurement patterns of the project area occupants. Further, the overall goal of the historic structure assessment is to understand the construction and use of the building within its associated historic context. Therefore, adequate information on site function, context, and chronology from both archaeological and historic perspectives is essential for the investigation. The fieldwork and archival research were undertaken with the following primary research goals in mind:

1) To identify cultural and historic resources occurring within the project; 2) To determine, if possible, site type and function, context of the deposit, and chronological placement of each cultural resource identified, and the type, style, and method of construction for any buildings;
3) To place each cultural resource identified within a regional perspective; 4) To identify persons or events associated with any buildings and their construction; and 5) To provide recommendations for the treatment of each cultural and historic resource identified.

Attachment I.D
Agenda Page 263

Cultural Resources Study for the YMCA Downey Project

3.0–1

3.0 ANALYSIS OF PROJECT EFFECTS

The cultural resources study of the project consisted of an institutional records search, archival research, an intensive cultural resource survey of the entire 2.16-acre study area, and the preparation of this technical report. This study was conducted in conformance with Section 21083.2 of the California Public Resources Code and CEQA. Statutory requirements of CEQA (Section 15064.5) were followed for the identification and evaluation of resources. Specific definitions for archaeological resource type(s) used in this report are those established by the State Historic Preservation Office (SHPO 1995).

3.1 Survey Methods
The survey methodology employed during the current investigation followed standard archaeological field procedures and was sufficient to accomplish a thorough assessment of the project. The field methodology employed for the project included walking evenly spaced survey transects set approximately 10 meters apart while visually inspecting the ground surface. All potentially sensitive areas where cultural resources might be located were closely inspected.

Photographs documenting survey areas and overall survey conditions were taken frequently.

3.2 Results of the Field Survey
BFSA staff archaeologist Mary Chitjian conducted the cultural resources survey of the YMCA Downey Project on April 15, 2024. The survey was an intensive reconnaissance consisting of a series of survey transects across the project. While the entire project was accessible, ground surface visibility was poor as the subject property is entirely developed containing the YMCA recreational building at 11531 Downey Avenue, a commercial/office building at 11525 Downey Avenue, and one single-family residence with a detached garage at 8268 Arnett Street, along with associated hardscape and landscaping (Plates 3.2–1 and 3.2–2). Vegetation within the property consisted entirely of maintained commercial and residential landscaping. The survey did not identify any prehistoric resources or archaeological sites within the property. However, all structures within the property are older than 50 years in age and must be evaluated for inclusion in the CRHR. The YMCA recreational building at 11531 Downey Avenue (built 1963) is already recorded as P-19-190639, while the commercial/office building at 11525 Downey Avenue (built 1965) and the single-family residence with a detached garage at 8268 Arnett Street (built between 1947 and 1950) have temporarily been recorded as Temp-1 and Temp-2, respectively (Figures

3.2‒1 and 3.2‒2). The appropriate State of California Department of Parks and Recreation (DPR) site record forms/updates for each resource were submitted to the SCCIC. Once processed, the SCCIC will assign permanent site number for sites Temp-1 and Temp-2. The following section provides the pertinent field results for the significance evaluation for sites P-19-190639, Temp-1, and Temp-2.

Attachment I.D
Agenda Page 264

3.0–2
Plates 3.2–1 and 3.2–2
The YMCA Downey Project
Plate 3.2–2: Overview of the subject property, facing north.

Plate 3.2–1: Overview of the subject property, facing southwest.

Attachment I.D
Agenda Page 265

P-19-190639
Temp-1
Temp-2
Figure 3.2–1
Cultural Resource Location Map
The YMCA Downey Project
USGS South Gate and Whittier Quadrangles (7.5-minute series)

3.0 –3
Legend
Project boundary
Cultural resource
Attachment I.D
Agenda Page 266

Downey AvenueArnett
S
t
r
e
e
t
P-19-190639
(11531 Downey Avenue)
Temp-1
(11525 Downey Avenue)
Temp-2
(8268 Arnett Street)

3.0–4
Figure 3.2–2
Cultural Resources Shown on Aerial Photograph
The YMCA Downey Project
Legend
Project boundary
Attachment I.D
Agenda Page 267

Cultural Resources Study for the YMCA Downey Project

3.0–5

3.3 Historic Structure Analysis
Within the boundaries of the subject property, three historic properties were identified consisting of the single-family residence with a detached garage at 8268 Arnett Street (built between 1947 and 1950), the commercial/office building at 11525 Downey Avenue (built 1965), and the YMCA recreational building at 11531 Downey Avenue (built 1963). Descriptions and significance evaluations of the historic resources are provided below.

3.3.1 History of the Property: Ownership and Development The tracing of property ownership and development within the subject property focused on each individual property from the date of construction.

8268 Arnett Street (Temp-2)
The residential neighborhood surrounding 8268 Arnett Street was subdivided in 1945 as part of Tract Number 13240. However, 8268 Arnett Street and the other two properties that comprise the current study, 11531 and 11525 Downey Avenue, are depicted on the Tract Number 13240 tract map as “Not A Part of This Subdivision.” As such, it is not entirely clear when the parcels that comprise the property were subdivided. Regardless, County Assessors data indicates the residence at 8268 Arnett Street was constructed in 1947; however, the residence does not appear on a 1947 aerial of the property and a review of city directories did not identify a listing for the residence until 1950, when William Kimberly, his wife Doris, and son Fred, likely from a previous marriage, are listed at the home (Ancestry.com 2011). William is listed as a tin smith and Fred as a cabinetmaker. Minimal information could be found regarding the Kimberlys.

William was born in Toronto, Ontario, Canada in 1897, while Doris was born in Toronto in 1914.

They were not married until 1947, and in 1948, they moved to the United States (Ancestry.com 2014). The 1950 Federal Census lists the family at a different residence in Downey, 11832 Paramount Boulevard, indicating that when listed in the 1950 directory, the family had not been at the Arnett Street residence for long (Ancestry.com 2022).

A requested COT report failed to identify the original owner of the property or architect.

The City of Downey did not respond to requests for the original building permit. Further, limited information regarding individuals owning and/or residing at the property could be found through archival research. Based on a review of city directories available from Ancestry.com and newspaper entries found during property research, the individuals residing at the residence changed regularly between 1950 and 1975 (Table 3.3‒1). As such, it appears the residence served as a rental property and no information tying any of the individuals listed at the property to significant events could be found through archival research. Based on the COT for the property, the YMCA acquired the parcel from Ross P. Dunton as Executor of the Estate of Dorothy E.

Dunton in 1992.

Attachment I.D
Agenda Page 268

Cultural Resources Study for the YMCA Downey Project

3.0–6
Table 3.3‒1
Individuals Listed at 8268 Arnett Street

Year Listed Individual(s) Source
1950 William Kimberly, Doris Kimberly,
and Fred Kimberly City Directory
1952 Harold Zimmerman and Eleanor
Zimmerman City Directory
1953 George A O’Neill and Phyllis J
O’Neill City Directory
1957 Labty Swisher City Directory
1959 Thomas D Gough and Martha Gough City Directory
1961 J. Boyd City Directory
1963 M. Shisher City Directory
1965 VACANT City Directory
1968 VACANT City Directory
1974 Bixby M Newspaper: The Los Angeles
Times
1975 Robert Hopfauf with wife and
daughter Newspaper: News Pilot

11525 Downey Avenue (Temp-1)
County Assessors records indicate the commercial/office building at 11525 Downey Avenue was constructed in 1965. Archival research did not identify an architect for the building and the City of Downey did not respond to requests for the original building permit. According to city directories and the COT the first tenant and owner of the building was the Downey School Employees Federal Credit Union. The 1965 city directory lists both the Downey Education Association and the aforementioned credit union at the building. The Downey School Employees Federal Credit Union owned the building through 1975, when they constructed a new building at the northeast corner of Third and New streets (Los Angeles Times 1975a). Based on the COT for the property, that same year the building was sold to Kenton and Patricia Krogstad and Joel and Rita McCurdy, who rented out the office space of the building. By November of 1975, Brown & Associates Realtors is listed at the property (Los Angeles Times 1975b) and in 1978, RE/MAX Properties is listed (Los Angeles Times 1978). Other businesses identified at the property during Attachment I.D
Agenda Page 269

Cultural Resources Study for the YMCA Downey Project

3.0–7
the 1980s include the Van Buren Associates, A California Limited Partnership in 1985 (Press- Telegram 1985) and Robert Coates-C.P.A. in 1988 (Press-Telegram 1988). Based on the COT, the Krogstads and McCurdys held the property until it was sold to the YMCA in 1997. It appears the YMCA continued to rent the building as Google Street View images from 2014 and 2015 show signs at the building advertising the grand opening of the Bellflower Law Center.

11531 Downey Avenue (P-19-190639)
The history of the 11531 Downey Avenue property is presented within the historic context section (see Section 1.3). As outlined in the history of the Downey YMCA, the current 11531 Downey Avenue property was acquired in 1955. The YMCA initially utilized William Altig’s former residence and grounds for their offices and meeting spaces until a new facility, designed by Roy Donley & Associates, was constructed in 1963. In 1976, the Altig residence was demolished, and the YMCA building was expanded to the current building size now found at 11531 Downey Avenue (Brown 2011).

Roy Donley, the architect who designed the building, was born in Kenosha, Wisconsin on August 13, 1913 (PCAD 2024). Donley graduated from the University of California, Berkeley in 1938. The 1956 American Architects Directory list his principal works at that time as:

Hall of the Crucifixion-Forest Lawn Mem. Park, 51; Off. Bldg, L.A, E. I. du Pont de Nemours & Co; Kimberly Corp, Fountain Pen Factory, Culver City, Cal, & Synthetic Rubber Warehouse-Midland Rubber Corp, L.A, 53; Friden Calculators Office Building, Los Angeles, Calif, 55; Young’s Market Co, Liquor Warehouse, Long Beach, Calif. (American Architects Directory 1956)

Donely worked throughout the Los Angeles area during the 1950s and 1960s and designed modern institutional buildings exhibiting International, New Formalism, and Brutalism architectural styles. Some of Donley’s more well-known institutional buildings include the Charles Drew Middle School at 8511 Compton Avenue (Dudek 2022), the Verbum Dei High School at 11100 South Central Avenue (The Tidings 1963), as well as multiple schools in Torrance such as West High School, South High School, Hickory Elementary, and Towers Elementary (American Architects Directory 1970; Gnerre 2022).

After retirement from architecture, Donley became a successful watercolor artist and won several awards in addition to being an active member of the Pacific Palisades Art Association (Palisadian-Post 2008).

3.3.2 Description of Surveyed Resources
8268 Arnett Street
The 8268 Arnett Street single-family residence was constructed between 1947 and 1950 in the Minimal Traditional architectural style. The building exhibits a smooth, stucco finish and features a low-pitched hipped roof with a moderate eave overhang and composite shingles (Plates Attachment I.D
Agenda Page 270

Cultural Resources Study for the YMCA Downey Project

3.0–8

3.3–1 and 3.3–2). The roof plan is rectangular in shape (see Plate 1.4–8). On the primary (northeast) façade, the foundation of the residence is raised, with two concrete steps to access a covered concrete slab porch, the roof of which is supported by two painted 4" x 4" posts, one at the east corner of the porch and the other near the center of the porch (Plate 3.3–3). It is unknown whether the concrete slab continues to the interior or if the rest of the residence has a wood frame foundation.

A continuous concrete walkway starts at the street curb on Arnett Street with grass on both sides, is intersected by a concrete sidewalk, then continues straight, dividing the front yard lawn on either side, continuing to the two concrete steps on the northeast (primary) façade of the residence (see Plates 3.3–1 and 3.3–2). The steps connect to the covered concrete slab porch, which in turn leads to the main entrance of the residence. The main entrance features a white- painted, six-paneled wood door, which is near the center of the primary façade. It is unknown whether the wood door is original. The main entrance is located southeast of a protruding section of the residence, which features a 1/1 square vinyl-framed, single- or double-hung window. The main entrance is also southeast of a square 1/1 wood- or vinyl-framed, single- or double-hung window (two horizontal fixed panels per pane), which is flush with the door in a recessed wall, sitting under the covered porch (see Plate 3.3–3).

The main entrance is located northwest of a projected wall that forms three sides of a hexagon, with the segment facing the street being larger than the two flanking it. The northwest segment features a 1/1 vinyl- or wood-framed, single- or double-hung window (two horizontal fixed panels per pane). The central segment features a square picture window with four horizontal fixed panes. The southeast segment features a 1/1 vinyl-framed, single- or double- hung window (see Plate 3.3–3). The vinyl-framed windows replaced the original wood-framed windows present when the building was constructed.

The southeast façade of the residence features three 1/1 vinyl-framed, single- or double- hung windows (Plate 3.3–4). A vertical, stuccoed utility meter box protrudes from the building and is located between the southernmost window and the middle window. The roof line along the southeast façade of the residence features a small eave.

Along the perimeter of the southeastern property boundary, offset from the southeast façade, a red concrete block wall separates the residence from an adjacent parking lot, forming a setback of a few feet. It is unknown whether the wall belongs to the 8268 Arnett Street residence or to the adjacent property, the commercial/office building located at 11525 Downey Avenue (see Plates 3.3–1 and 3.3–4). The wall begins at the south corner of the property, extending northeast along the southeastern boundary, and then drops four blocks to a lower height for the last few feet.

The wall ends flush with the northeast façade of the 11525 Downey Avenue commercial/office building, a few feet before the sidewalk begins (see Plate 1.4–8).

Attachment I.D
Agenda Page 271

Plate 3.3–1
Northeast Façade of the 8268 Arnett Street Residence, Facing Southwest The YMCA Downey Project3.0–9Attachment I.D
Agenda Page 272

Plate 3.3–2
Northeast (Left) and Northwest (Right) Façades of the
8268 Arnett Street Residence, Facing South
The YMCA Downey Project3.0–10Attachment I.D
Agenda Page 273

Plate 3.3–3
Northeast Façade of the 8268 Arnett Street Residence, Facing Southwest The YMCA Downey Project3.0–11Attachment I.D
Agenda Page 274

Plate 3.3–4
Southeast (Left) and Northeast (Right) Façades of the
8268 Arnett Street Residence, Facing West
The YMCA Downey Project3.0–12Attachment I.D
Agenda Page 275

Cultural Resources Study for the YMCA Downey Project

3.0–13
The southwest façade of the residence was not accessible during the field survey and is not clearly visible in aerial imagery. It is unknown if it features doors or windows. It appears flush without projections or recessions. Southwest of the façade is the backyard which reaches the property boundary. It is unknown whether a physical separation such as a fence or wall exists with the adjacent outdoor corridor of the 11531 Downey Avenue property or if the 8268 Arnett Street residence is accessible via the 11531 Downey Avenue property (see Plate 1.4–8).

The northwest façade of the 8268 Arnett Street residence features two 1/1 vinyl- or wood- framed, single- or double-hung windows, one on each end of the façade, and a door with 1/1 top glazing in the middle of the façade. The roof line along the northwest façade of the residence features a small eave; however, the eave projects noticeably further over the door area (Plate 3.3– 5).

A detached garage is located in the west corner of the property and has a pyramid or hipped roof and a similarly colored smooth, stucco finish to the residence (see Plate 3.3–2). The roof plan of the garage is rectangular in shape (see Plate 1.4–8). A concrete slab the width of the garage door forms a continuous driveway from the street to the garage (see Plate 3.3–2). The northeast façade of the detached garage features a white, counterweight garage door with horizontal wood panels (Plate 3.3–6). It is unknown whether the detached garage features doors or windows on its other façades as those areas were not accessible during the survey of the property.

A chain-link fence beginning at the north corner of the residence crosses northwest over the concrete-slab driveway, featuring a swinging double gate to allow entry to the driveway, and ends at the northwestern boundary of the property. Where the chain-link fence ends, a vertical wood plank fence runs southwest along the northwestern boundary of the property separating the 8268 Arnett Street property from the adjacent property (see Plate 3.3–6). Parallel to the chain-link fence, at a lower height, a concrete block wall begins at the northwest façade of the residence and continues northwest until meeting the concrete slab driveway. The concrete block wall then continues southwest along the concrete slab driveway, containing a white-painted, metal, vertical- bar entry gate, until connecting to the primary (northeast) façade of the detached garage (see Plate

3.3–5).

11525 Downey Avenue
The 11525 Downey Avenue building is a Brutalist-style, two-story commercial/office building which features a flat roof with parapets and an asymmetrical “L”-shaped plan on a concrete slab foundation (see Plates 1.4–8 and 3.3–7). The building has a textured white stucco finish. Given the depth of the floor and roof plates, and that the stucco façade projects slightly from the concrete slab foundation, the building appears to be built using standard wood frame construction (see Plates 3.3–7 and 3.3–8).

The primary (southeast) façade of the building is split into three sections, occupying nearly the length of the property limits. The southernmost section is a white, stuccoed façade with two narrow, floor-to-ceiling, slightly recessed slit windows located in the southern third of the section (see Plate 3.3–7).

Attachment I.D
Agenda Page 276

Plate 3.3–5
Northeast (Left) and Northwest (Right) Façades of the 8268 Arnett Street Residence and Northeast Façade of the Detached Garage, Facing South The YMCA Downey Project3.0–14Attachment I.D
Agenda Page 277

Plate 3.3–6
Northeast (Left) and Northwest (Right) Façades of the 8268 Arnett Street Residence and Northeast Façade of the Detached Garage, Facing Southwest The YMCA Downey Project3.0–15Attachment I.D
Agenda Page 278

Plate 3.3–7
Southeast Façade of the 11525 Downey Avenue Building, Facing Northwest The YMCA Downey Project3.0–16Attachment I.D
Agenda Page 279

Plate 3.3–8
Southeast (Left) and Northeast (Right) Façades of the
11525 Downey Avenue Building, Facing West
The YMCA Downey Project3.0–17Attachment I.D
Agenda Page 280

Cultural Resources Study for the YMCA Downey Project

3.0–18
The middle section of the primary façade houses the building’s vertical circulation, shielded from the elements by the second-story floor plate and the roof plate. The middle section is open on the southeast side of the building which forms a courtyard on the first floor and a balcony on the second story. Flush with the stucco façade of the south and north sections, the middle section of the building is gated with a wrought metal fence that starts at the concrete slab level, proceeds vertically to wrap around the horizontal, slightly recessed second-story floor plate, and continues upwards to become a guardrail for the second-story balcony area. This guardrail is loosely wrapped in barbed wire. On the first floor, a wrought metal gate is flanked symmetrically by wrought metal bars and opens into the previously described vertical circulation area (Plate 3.3– 9). Almost immediately inside the gate, a concrete-stepped stairway with a black metal handrail on either side separates the building into two modules, with doors and windows present on both sides of the stairs on the first and second floors.

The northernmost section of the primary (southeast) façade is a white, stuccoed façade with three narrow, floor-to-ceiling, slightly recessed slit windows located in the northern third of the section (see Plate 3.3–7).

The northeast façade of the building occupies about a third of the property perimeter (Plates

3.3–10 and 3.3–11). The building features a rectangular footprint with a small northwestern projection on the southern end creating an “L”-shape. The northeast façade of the projection is roughly half the size of the main part of the northeast façade. The northeast façade of the northwestern projection features two narrow, slightly recessed slit windows on the second story and a garage door with horizontal panels on the first floor.

The northwest façade of the main portion of the building is about two-thirds of the building’s dimension. The northwest façade features a single, narrow, slightly recessed slit window on the second story and three pedestrian doors on the first floor. The two doors located on the northern most section of the northwest façade are wood. The door located in the middle section of the northwest façade is a wrought metal barred door, opposite the metal door on the middle section of the primary (southeast) façade, and provides entrance to the first-floor courtyard (Plate 3.3–11).

The southwest façade of the building is two stories and features textured white stucco (Plate

3.3–12). It is about half of the length of the property perimeter (see Plate 1.4–8).

To the west of the building is a parking lot with a red concrete block wall along its boundaries. The wall was previously described when discussing the 8268 Arnett Street property.

The wall begins at the west corner of the northwestern projection of the building, continuing northwest along the boundary of the property. At the west corner of the property, the wall extends northeast along the northwestern boundary of the property, and then drops four blocks to a lower height for the last few feet. The wall ends flush with the northeast façade of the 11525 Downey Avenue building, a few feet before the sidewalk begins. The wall then extends southeast until terminating at the entrance to the parking lot (see Plates 3.3–4 and 3.3–10).

Attachment I.D
Agenda Page 281

Plate 3.3–9
Southeast Façade of the 11525 Downey Avenue Building, Facing Northwest The YMCA Downey Project3.0–19Attachment I.D
Agenda Page 282

Plate 3.3–10
Northeast Façade of the 11525 Downey Avenue Building, Facing Southwest The YMCA Downey Project3.0–20Attachment I.D
Agenda Page 283

Plate 3.3–11
Northeast (Left) and Northwest (Right) Façades of the
11525 Downey Avenue Building, Facing South
The YMCA Downey Project3.0–21Attachment I.D
Agenda Page 284

Plate 3.3–12
2022 View of Southwest (Left) and Southeast (Right) Façades of the 11525 Downey Avenue Building, Facing North
The YMCA Downey Project
(Image Courtesy of Google Street View)3.0–22Attachment I.D Agenda Page 285

Cultural Resources Study for the YMCA Downey Project

3.0–23
11531 Downey Avenue
According to a historic architectural assessment of the property located at 11531 Downey Avenue conducted by Wayne Bonner and Kathleen Crawford for Michael Brandman Associates in 2013, “The subject property is a one- and two-story, irregular shaped, asymmetrical, Modern style, community center building located in a mixed residential and commercial neighborhood” (Bonner and Crawford 2013). BFSA concurs with the previous assessment in the classification of Modern style and adds the specification of the International style. Additionally, Bonner and Crawford’s report assessed the construction details and condition:

The 53,673 square foot building has a concrete foundation, stucco and brick exterior, and a multilevel flat roof. A flat roof projects from the main façade and is supported by square pillars. Large sections of brick wall covering alternate with large stucco-faced wall sections, creating a geometric effect on the various façades.

The entrances include glass and metal doors. Windows vary in size, shape and placement around the façades and include rectangular shaped, multlite, metal framed, fixed pane windows. The building is in good condition but has been altered by a major addition in the 1970s on the north side of the structure. (Bonner and Crawford 2013)

The primary (southeast) façade features the YMCA logo (Plate 3.3–13). This façade occupies more than half of the property perimeter. The remaining perimeter is bounded by a mixed tinted- and raw-colored concrete block wall with a vertical chain-link fence topped by three lines of barbed wire added after 2021 to the top of the concrete block wall for additional security. In front of the concrete block wall is a YMCA pole sign constructed at an unknown date (Plate 3.3– 14). Three main openings to the wall are present. Two primary vehicular entrances are in the southern parking lot area that are gated by a chain-link fence and feature double swing gates. The third opening is an area accessible by foot with a swing door in the chain-link fence that provides access along the southwest façade of the building, flanked by two almost equally sized fence sections.

Following the third opening, the chain-link fence terminates at the corner of a red brick wall that bounds the southwest and southeast façades of the building. The southernmost section of the primary (southeast) façade of the building comprises the red brick wall topped by barbed wire (Plate 3.3–15). The center section of the primary (southeast) façade still features the red brick wall, but it is overlapped by an offset stucco wall, with the stucco wall extending to the top of the second-story roof. The stucco wall features the YMCA logo on the south end (see Plates 3.3–13 and 3.3–15). At the terminus of the white stucco wall, the red brick wall continues for a few feet before transitioning to a metal fence with vertical bars. The fence features a double swing door entrance and is topped with barbed wire. Offset from the rest of the southeast façade, behind the metal fence, is the northernmost section of the primary (southeast) façade.

Attachment I.D
Agenda Page 286

Plate 3.3–13
Southeast Façade of the 11531 Downey Avenue Building, Facing North The YMCA Downey Project3.0–24Attachment I.D
Agenda Page 287

Plate 3.3–14
Overview of the 11531 Downey Avenue Property, Facing North The YMCA Downey Project3.0–25Attachment I.D
Agenda Page 288

Plate 3.3–15
Southeast Façade of the 11531 Downey Avenue Building, Facing West The YMCA Downey Project3.0–26Attachment I.D
Agenda Page 289

Cultural Resources Study for the YMCA Downey Project

3.0–27
This northernmost section of the primary (southeast) façade is the late-1970s addition. The white stucco façade features two rows of horizontal windows: one row on the first floor and one row on the second floor. The windows are arranged three in each row, with each window being three-paned. The center of the first-floor row features a double glass door. The windows and doors on the first floor were boarded over during or after 2022 (Plates 3.3–16 and 3.3–17).

The northeast façade of the building consists of the late-1970s addition and features a smooth stucco wall painted white with seven tripartite ribbon windows that overlook the single- family residence at 8268 Arnett Street (see Plate 3.3–1). At the very top of the façade, a band of brown, corrugated metal deck siding creates a datum. This section protrudes from the rest of the façade. The westernmost section of the northeast façade is recessed by the width of stairs and the smooth stucco façade is partially painted white. An outdoor metal utility stairway connects the roof to the ground level (see Plate 3.3–6). At the top of the stairs is a small landing where a chain- link fence extends for a few feet northwest along the roof. The landing leads to a doorway in the corrugated metal deck siding datum. A 1/1 window sits under the staircase landing.

The northwest façades of both the original building and the late-1970s addition are two stories and do not feature any doors or windows (Plate 3.3–18). The façade of the northernmost portion of the building (the late-1970s addition) is concrete, while the façade of the southernmost portion of the building (the original building) is red brick.

The southwest façade of the building features a two-story red brick façade on the westernmost half and a single-story red brick façade on the easternmost half (Plate 3.3–19). The two-story portion of the façade features no door or window openings but exhibits four white pilaster-type posts alternating with the brick sections. The two-story portion features a flat roof without any coping or parapet (Plate 3.3–20). The single-story portion of the southwest façade features several door openings that have been boarded over. The roof of the single-story portion is flat with a wide overhang (see Plates 3.3–19 and 3.3–21). At the easternmost end of the southwest façade, a metal door is located between the building and a red brick wall topped with barbed wire. The red brick wall continues southeast and intersects the red brick wall that comprises the primary (southeast) façade of the building (see Plate 3.3–21).

3.3.3 Significance Evaluation
CEQA guidelines (Section 15064.5) address archaeological and historic resources, noting that physical changes that would demolish or materially alter in an adverse manner those characteristics that convey the historic significance of the resource and justify its listing on inventories of historic resources are typically considered significant impacts.

Because demolition of the buildings located at 8268 Arnett Street, 11525 Downey Avenue, and partial demolition of 11531 Downey Avenue would require approval from the City of Downey as part of the proposed project, CEQA eligibility criteria were used to evaluate the historic structures within the property as potentially significant historic buildings.

Attachment I.D
Agenda Page 290

Plate 3.3–16
2022 View of Southeast Façade of the 1970s Addition to
the 11531 Downey Avenue Building, Facing Northwest
The YMCA Downey Project
(Image Courtesy of Google Street View)3.0–28Attachment I.D Agenda Page 291

Plate 3.3–17
Southeast Façade of the 1970s Addition (Right) to the
11531 Downey Avenue Building, Facing West
The YMCA Downey Project3.0–29Attachment I.D
Agenda Page 292

Plate 3.3–18
2019 View of the Northwest Façade of the
11531 Downey Avenue Building, Facing Southeast
The YMCA Downey Project
(Image Courtesy of Google Street View)3.0–30Attachment I.D Agenda Page 293

Plate 3.3–19
Southwest Façade of the 11531 Downey Avenue Building, Facing North The YMCA Downey Project3.0–31Attachment I.D
Agenda Page 294

Plate 3.3–20
Two-Story Portion of the Southwest Façade of the
11531 Downey Avenue Building, Facing Northeast
The YMCA Downey Project3.0–32Attachment I.D
Agenda Page 295

Plate 3.3–21
Single-Story Portion of the Southwest Façade of the 11531 Downey Avenue Building, Showing the Roof Overhang and Metal Door, Facing Northeast The YMCA Downey Project3.0–33Attachment I.D
Agenda Page 296

Cultural Resources Study for the YMCA Downey Project

3.0–34
Integrity Evaluation
When evaluating a historic resource, integrity is the authenticity of the resource’s physical identity clearly indicated by the retention of characteristics that existed during its period of construction. It is important to note that integrity is not the same as condition. Integrity directly relates to the presence or absence of historic materials and character-defining features, while condition relates to the relative state of physical deterioration of the resource. In most instances, integrity is more relevant to the significance of a resource than condition; however, if a resource is in such poor condition that original materials and features may no longer be salvageable, then the resource’s integrity may be adversely impacted. For the 8268 Arnett Street, 11525 Downey Avenue, and 11531 Downey Avenue buildings, seven aspects of integrity were used for the evaluation, as recommended in the National Register Bulletin: How to Apply the National Register Criteria for Evaluation (Andrus and Shrimpton 2002):

1. Integrity of Location [refers to] the place where the historic property was constructed or the place where the historic event occurred (Andrus and Shrimpton 2002). Integrity of location was assessed by reviewing historical records and aerial photographs in order to determine if the buildings had always existed at their present locations or if they had been moved, rebuilt, or their footprints significantly altered. Historical research revealed that the buildings located at 8268 Arnett Street, 11525 Downey Avenue, and 11531 Downey Avenue were constructed in their current locations between 1947 and 1965. Therefore, the buildings retain integrity of location.

2. Integrity of Design [refers to] the combination of elements that create the form, plan, space, structure, and style of a property (Andrus and Shrimpton 2002). Integrity of design was assessed by evaluating the spatial arrangement of the buildings and any architectural features present.

a. 8268 Arnett Street: The single-family residence and detached garage were constructed in the Minimal Traditional style, between 1947 and 1950. The only known modifications that have occurred to the residence and detached garage since their construction were the replacement of the original wood windows in the residence. Although vinyl windows are not characteristic of the Minimal Traditional style, the modification does not negatively impact integrity of design to the point of no longer retaining character-defining features of the style. Therefore, the 8268 Arnett Street buildings do retain integrity of design.

b. 11525 Downey Avenue: The commercial/office building was originally constructed in 1965 in the Brutalist style. No known modifications have been made to the building since its initial construction. Therefore, the 11525 Downey Avenue building retains integrity of design.

Attachment I.D
Agenda Page 297

Cultural Resources Study for the YMCA Downey Project

3.0–35
c. 11531 Downey Avenue: The recreational facility was built in 1963 as an International-style building. A major addition was built onto the northwest side of the building in the late 1970s. Although the addition was also constructed in the International style, it altered the form, plan, or space of the building and introduced new design features, such as the stucco walls and large corrugated metal datum, which impacted the overall style of the building. Therefore, the 11531 Downey Avenue building does not retain integrity of design.

3. Integrity of Setting [refers to] the physical environment of a historic property. Setting includes elements such as topographic features, open space, viewshed, landscape, vegetation, and artificial features (Andrus and Shrimpton 2002). Integrity of setting was assessed by inspecting the elements of the property, which include topographic features, open space, views, landscape, vegetation, man-made features, and relationships between buildings and other features. The 8268 Arnett Street single- family residence and detached garage were constructed between 1947 and 1950 and were originally located in a residential neighborhood surrounded by other mostly small, residential buildings. Since its construction, the 11525 and 11531 Downey Avenue buildings were built abutting the 8268 Arnett Street property. Due to their construction, the 8268 Arnett Street property no longer retains the same open space, views, landscapes, or man-made features associated with its 1947 to 1950 construction.

Likewise, the late-1970s addition to the northeast façade of the 11531 Downey Avenue building negatively impacted integrity of setting for not only the 8268 Arnett Street property, but also the 11525 Downey Avenue property, as well as the original portion of the 11531 Downey Avenue building. The late-1970s addition dwarfs the other buildings and encroaches up to the property lines of 8268 Arnett Street and 11525 Downey Avenue. As a result, none of the buildings retain integrity of setting.

4. Integrity of Materials [refers to] the physical elements that were combined or deposited during a particular period of time and in a particular pattern or configuration to form a historic property (Andrus and Shrimpton 2002). Integrity of materials was assessed by determining the presence or absence of original building materials, as well as the possible introduction of materials that may have altered the architectural design of the buildings.

a. 8268 Arnett Street: The one-story, single-family residence and detached garage were constructed in the Minimal Traditional style, between 1947 and 1950. Since the construction of the residence, a majority, if not all, of the original wood fenestration has been replaced with vinyl windows . As these modifications resulted in the replacement of original materials with those associated with later periods, the residence at 8268 Arnett Street does not Attachment I.D
Agenda Page 298

Cultural Resources Study for the YMCA Downey Project

3.0–36
feature materials representative of a specific period of time and, therefore, no longer retains integrity of materials. The detached garage, however, has not undergone any known modifications and, therefore, does retain integrity of materials.

b. 11525 Downey Avenue: The two-story commercial/office building was originally constructed in 1965 in the Brutalist style. No known modifications have occurred since the building’s construction, and, therefore, the building does retain integrity of materials.

c. 11531 Downey Avenue: The YMCA recreation center was built in 1963. Since its construction, a large addition was built onto the northeast side of the building.

As the addition removed the northeast façade of the original building and the northwest façade of the original northeast wing, materials original to those façades, assumed to be primarily brick, were removed as well. Furthermore, new materials were introduced as part of the late-1970s addition including the corrugated metal deck siding datum, ribbon windows, and smooth stucco finishes. As a result, the building no longer retains integrity of materials.

5. Integrity of Workmanship [refers to] the physical evidence of the labor and skill of a particular culture or people during any given period in history (Andrus and Shrimpton 2002). Integrity of workmanship was assessed by evaluating the quality of the architectural features present in the buildings.

a. 8268 Arnett Street: The original workmanship demonstrated by the construction of the 8268 Arnett Street residence and detached garage is average.

Since its construction, the residence has undergone the replacement of the original wood fenestration with vinyl windows. As the wood-framed windows were one of the only features of the building that exhibited any sort of workmanship, the residence no longer retains integrity of workmanship. In addition, although no known modifications have been made to the detached garage, there are no known original features that convey the physical evidence of the labor or skill of a particular culture or people during any given period in history. Therefore, the detached garage never possessed integrity of workmanship.

b. 11525 Downey Avenue: The two-story commercial/office was originally constructed in 1965 in the Brutalist style. No known modifications have occurred since the building’s construction, however, there are no physical features on the building that convey the physical evidence of the labor or skill Attachment I.D
Agenda Page 299

Cultural Resources Study for the YMCA Downey Project

3.0–37
of a particular culture or people during any given period in history. Therefore, the 11525 Downey Avenue building never possessed integrity of workmanship.

c. 11531 Downey Avenue: The YMCA recreation center was built in 1963 in the International style. Since its construction, a large addition was built onto the northeast façade of the building. As the addition removed the northeast façade of the original building and northwest façade of the original northeast wing, materials original to those façades, assumed to be primarily brick, were removed as well. In addition, new materials were introduced as part of the late-1970s addition including the corrugated metal deck siding datum, ribbon windows, and smooth stucco finishes. Regardless of the modifications, the building never featured any elements that convey the physical evidence of the labor or skill of a particular culture or people during any given period in history. Therefore, the 11531 Downey Avenue building never possessed integrity of workmanship.

6. Integrity of Feeling [refers to] a property’s expression of the aesthetic or historic sense of a particular period of time (Andrus and Shrimpton 2002). Integrity of feeling was assessed by evaluating whether or not the resources’ features, in combination with their setting, conveyed a historic sense of the property during the period of construction.

As noted previously, the integrity of the setting for the buildings has been lost due to the transformation of the surrounding properties. In addition, the loss of integrity of materials through the late-1970s addition to the 11531 Downey Avenue property and the replacement of windows on the 8286 Arnett Street single-family residence have impacted their ability to express an aesthetic or historic sense of a particular period of time. Although the 11525 Downey Avenue building has not undergone any known modifications to its materials the loss of setting has negatively impacted its integrity of feeling. As such, none of the buildings retain integrity of feeling.

7. Integrity of Association [refers to] the direct link between an important historic event or person and a historic property (Andrus and Shrimpton 2002). Integrity of association was assessed by evaluating the resources’ data or information and their ability to answer any research questions relevant to the history of the city of Downey or the state of California. The 8268 Arnett Street buildings were constructed between 1947 and 1950. Historical research did not reveal any connections to any important historic persons or events. Therefore, the buildings located at 8286 Arnett Street do not possess integrity of association. The 11525 Downey Avenue office/commercial building was constructed in 1965. Historical research did not reveal any connections to any important historic persons or events. Therefore, the 11525 Downey Avenue building does not possess integrity of association. The 11531 Downey Avenue YMCA recreation building was constructed in 1963 and underwent modifications in the late Attachment I.D
Agenda Page 300

Cultural Resources Study for the YMCA Downey Project

3.0–38
1970s. Historical research did not reveal any connections to any important historic persons or events. Therefore, the 11531 Downey Avenue building does not possess integrity of association.

Of the seven aspects of integrity, the 8268 Arnett Street residence and detached garage possess integrity of location and design, and the detached garage possesses integrity of location, design and materials. The 11525 Downey Avenue office/commercial building possesses integrity of location, design, and materials. The 11531 Downey Avenue YMCA recreation building possesses only integrity of location.

CRHR Evaluation
For a historic resource to be eligible for listing on the CRHR, the resource must be found significant at the local, state, or national level, under one or more of the following criteria:

• CRHR Criterion 1:

It is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage.

a. 8268 Arnett Street: The history of 8268 Arnett Street is tied to use as a single- family residence built sometime between the years 1947 and 1950. Historical research did not reveal any association with events that have made a significant contribution to the broad patterns of California’s history or cultural heritage.

Therefore, it does not qualify for CRHR Criterion 1.

b. 11525 Downey Avenue: The 11525 Downey Avenue commercial/office building was built in 1965. Historical research did not reveal any association with events that have made a significant contribution to the broad patterns of California’s history or cultural heritage. Therefore, it does not qualify for CRHR Criterion 1.

c. 11531 Downey Avenue: The 11531 Downey Avenue building is an recreational building built in 1963. Historical research did not reveal any association with events that have made a significant contribution to the broad patterns of California’s history or cultural heritage. Therefore, it does not qualify for CRHR Criterion 1.

• CRHR Criterion 2:

It is associated with the lives of persons important in our past.

Attachment I.D
Agenda Page 301

Cultural Resources Study for the YMCA Downey Project

3.0–39
Historical research revealed that neither 8268 Arnett Street, 11525 Downey Avenue, nor 11531 Downey Avenue are associated with any persons important in our past.

Because the properties could not be associated with the lives of any important persons in our past, the buildings are not eligible for designation under CRHR Criterion 2.

• CRHR Criterion 3:

It embodies the distinctive characteristics of a type, period, region, or method of construction; represents the work of an important creative individual; or possesses high artistic values.

a. 8268 Arnett Street: The 8268 Arnett Street building was constructed between 1947 and 1950 as a Minimal Traditional-style, single-family residence.

According to McAlester (2015):

Minimal Traditional homes can be found throughout the United States. During the early 1940s, concentrations were rapidly built where new sites for World War II production plants created an urgent local need for worker housing. After the war, developers built instant communities – such as Levittown, New York on Long Island, and Brentwood in Denver, Colorado – filled with Minimal Traditional houses, sometimes using only a few
designs in a subdivision. These were sometimes located outside the city’s built-up edge, where large tracts of land were available and new broad highways and arterials were planned for easy automobile access.

The Minimal Traditional house was “the little house that could.” It was the small house that could be built with FHA [Federal Housing Administration]-insured loans in the midst of the Great Depression between 1935 and 1940; the house that could be built quickly to accommodate millions of relocating World War II production-plant workers (1941-1945); and the house that could be built rapidly during the late 1940s in large post-World War II developments (1946-1949) …

Identifying features of the Minimal Traditional style include:

Low- or intermediate-pitched roof, more often gabled; small house, generally one-story in height; roof eaves have little or no overhang; double-hung windows, typically multi-pane or 1/1; Attachment I.D
Agenda Page 302

Cultural Resources Study for the YMCA Downey Project

3.0–40
minimal amounts of added architectural detail; rarely has dormers. (McAlester 2015)

The 8268 Arnett Street residence features seven characteristics of the Minimal Traditional style, including:

The building was constructed between 1947 and 1950, within the Minimal Traditional style’s height of popularity, which lasted from circa 1935 to 1950 (McAlester 2015). Within the Minimal Traditional style, McAlester (2015) has identified three principal subtypes: Gable-and-Wing Roof, Side-Gabled Roof (commonly called Cape Cod), and Other Roof. The 8268 Arnett Street residence is classified as the Other Roof subtype, since it does not feature any gables. McAlester (2015) also notes that while “hipped-roof and front-gabled [Minimal Traditional] houses are found, with hipped-roof versions the more widespread … these variations appear to be less common than other subtypes.” As such, the 8268 Arnett Street residence is most representative of a hipped- roof Minimal Traditional style residence.

The only known modification to the residence is the replacement ofwindows from wood frame to vinyl. It is unknown if the front door is original. While these alterations do not negatively impact the integrity of design for the building, the residence no longer retains integrity of materials, setting or feeling, and it never possessed integrity of workmanship or association. As such, although the residence features character-defining features of the Minimal Traditional style, due to an overall lack of integrity, it does not embody distinctive characteristics of a type, period, region, or method of construction.

Therefore, as the residence is not considered architecturally significant, was not constructed using indigenous materials, and is not a valuable example of the use of indigenous materials or craftsmanship, it is not eligible for designation under CRHR Criterion 3.

b. 11525 Downey Avenue: According to the Modernism Context Statement (City of San Diego 2007), the Brutalism style originated from the French term béton brut, meaning “raw concrete.” Worldwide, buildings designed in the Brutalism style began to be built as early as the 1950s. Largely inspired by Le Corbusier, a Swiss architect, buildings designed in the Brutalism style are strikingly blockish, geometric, and contain design elements with repetitive shapes. The primary material used in construction of Brutalism-style buildings is concrete, which serves as not only the primary structural material, but also the finish.

Those critical of the style state that Brutalism buildings disregard the social Attachment I.D
Agenda Page 303

Cultural Resources Study for the YMCA Downey Project

3.0–41
environment, thereby causing the structure to seem inhuman, stark, and out of place.

According to the Modernism Context Statement, there are four “Primary” character-defining features of Brutalism construction (City of San Diego 2007).

The following Primary character-defining features noted in the Modernism Context Statement have been specifically applied to the 11525 Downey Avenue office/commercial building, accordingly:

1. Exposed and expressive structural system

The building has a defined second floor and roof plate in the middle section of the southeast façade. While 11525 Downey Avenue has a defined second floor and roof plates to show the vertical circulation, which can be considered expressive, they feature two finishes: stucco (second-floor plate) and parapet textured segmental paneling. As the structural system is not exposed, 11525 Downey Avenue does not possess this Primary character-defining feature of Brutalism construction.

2. Monumental massing

11525 Downey Avenue is large (at two stories) but does not fit the definition of “monumental.” The building is shorter than 11531 Downey Avenue’s tallest point. The 11525 Downey Avenue building, therefore, does not possess this Primary character-defining feature of Brutalism construction.

3. Angular and rectilinear forms

The 11525 Downey Avenue building consists of an L-shaped orthogonal massing, with rectilinear vertical designs present on the southeast, northeast, and northwest façades (narrow slit windows). Therefore, the 11525 Downey Avenue building does possess this Primary character-defining feature of Brutalism construction.

4. Exposed concrete as building finish

11525 Downey Avenue has exterior finishing such as stucco and parapet paneling. 11525 Downey Avenue, therefore, does not possess this Primary character-defining feature of Brutalism construction.

Attachment I.D
Agenda Page 304

Cultural Resources Study for the YMCA Downey Project

3.0–42
Summary: Of the four Primary character-defining features of Brutalism construction expressed in the Modernism Context Statement, 11525 Downey Avenue possesses one feature.

According to the Modernism Context Statement, there are two “Secondary” character-defining features of Brutalism construction (City of San Diego 2007).

The following Secondary character-defining features noted in the Modernism Context Statement have been specifically applied to the 11525 Downey Avenue building, accordingly:

1. Repetitive patterns

The 11525 Downey Avenue building exhibits equally spaced, narrow, vertical slit windows on three façades of the building, which are a repetitive alteration of wall space, then window, then wall space. On the primary (southeast) façade, two slit windows at the southern end and three slit windows at the northern end span almost the height of the building. Likewise, on the northeast façade, three vertical windows are located towards the northernmost portion of the main section. The northwestern projection on the southern end of the building also features two narrow, vertical slit windows which only occupy the top half of the northeast façade. On the northwest façade of the main section of the building, only one window appears at the same height as the western projection.

The southwest façade has no slits or patterns of any kind; the wall only exhibits textured stucco. Despite the repetition seen in the vertical slit windows, the “repetitive patterns” feature refers more specifically to the structural form of the building and not the placement of windows or decorative elements. A definition of the form from the Saylor Academy states that “brutalist buildings usually are formed with striking repetitive angular geometries, and, where concrete is used, often revealing the texture of the wooden forms used for the in-situ casting” (Saylor Academy 2011). This description is further discussed by the authors of Brutalism:Online, who state that “brutalist buildings are usually formed with repeated modular elements forming massing representing specific functional zones” (Brutalism:Online n.d.). Although 11525 Downey Avenue exhibits a repetition of massing, with the south module being nearly symmetrical to the north module, it does not exhibit repetition of structural form, so it does not possess this Secondary character-defining feature of Brutalism construction.

Attachment I.D
Agenda Page 305

Cultural Resources Study for the YMCA Downey Project

3.0–43

2. Intentional avoidance of traditional elements or ornament

The 11525 Downey Avenue building was constructed with no traditional elements (i.e., windows or doors except at the vertical circulation lobby entrance) and no ornamentation other than the wrought metal gate, fence, and narrow vertical slit windows in the southeast, northeast, and northwest façades. 11525 Downey Avenue, therefore, does possess this secondary character- defining feature of the Brutalism style.

Summary: Of the two secondary character-defining features of Brutalism construction expressed in the Modernism Context Statement, the 11525 Downey Avenue building possesses one of these features.

In evaluating the potential significance and eligibility for the designation of modern institutional buildings, the Modernism Context Statement notes the following:

In most cases these massive buildings are associated with the work of a recognized master architect, and would be considered for designation individually. Given the importance of the building form and materials to the expression of Brutalism, modifications which significantly alter or obscure these character-defining features may render the building ineligible for designation. (City of San Diego 2007)

The two-story commercial/office building at 11525 Downey Avenue was designed by an unknown architect and builder. In addition, because the building does not feature a majority of the primary character-defining features of the Brutalism style, 11525 Downey Avenue does not meet this evaluation criterion under the Modernism Context Statement. The Modernism Context Statement further notes:

Landscape styles vary dramatically for this sub-style. Location and setting are particularly relevant for Brutalist resources which are institutional and related to a ‘campus’ environment, and the preservation of the surrounding site may be important to the overall significance of the resource. (City of San Diego 2007)

The 11525 Downey Avenue building is not institutional in nature, and it is not part of a “campus” environment. The form and massing of 11525 Downey Attachment I.D
Agenda Page 306

Cultural Resources Study for the YMCA Downey Project

3.0–44
Avenue do not “support a campus civic structure, giving architectural definition to the campuses’ streets, quadrangles, and other open spaces,” since the property does not possess streets, quadrangles, or other open spaces other than the parking lot. In addition, the varied building façades do not articulate “into constituent parts to mediate between the pedestrian scale and the scale of the building” to “provide visual continuity with neighboring buildings, and engage the landscape design of open spaces,” primarily because the property does not possess a pedestrian element or landscape design (UTSA Campus Master Plan 2014). Therefore, 11525 Downey Avenue does not meet this evaluation criterion for designation under the Modernism Context Statement. The Modernism Context Statement further notes, Southern California “examples of Brutalist architecture include some prominent structures such as Qualcomm Stadium and the Salk Institute, as well as a large concentration of downtown high-rises and buildings on the Campus of UCSD.”

11525 Downey Avenue is not a prominent structure, nor is it a high-rise located downtown or located in a campus environment. Therefore, 11525 Downey Avenue does not meet this evaluation criteria for designation under the Modernism Context Statement.

In summary, 11525 Downey Avenue only possesses one of the four primary character-defining features and one of the two secondary character-defining features of Brutalism construction, and therefore, cannot be considered a true, significant, representative example of Brutalism under the Modernism Context Statement.

c. 11531 Downey Avenue: In October 2007, the City of San Diego developed and implemented the Modernism Context Statement. The stated purpose of the Modernism Context Statement is to “assist in the identification, evaluation and preservation of significant historic buildings, districts, sites, and structures associated with the Modernism movement in San Diego from 1935 to 1970” and was created to better understand “Modern era resources and the types of resources that are significant to the history and development of San Diego” (City of San Diego 2007). The California SHPO utilizes the Modernism Context Statement in conjunction with the evaluation of potential historic resources constructed within the Modern era from 1935 to 1970.

According to Bonner and Crawford’s 2013 report and the Modernism Context Statement, the YMCA Complex at 11531 Downey Avenue was designed and constructed as a Modern style building in 1963. More specifically, the building Attachment I.D
Agenda Page 307

Cultural Resources Study for the YMCA Downey Project

3.0–45
features International style elements. However, the building was constructed after the circa 1935 to 1955 period of significance for International structures defined by the Modernism Context Statement (City of San Diego 2007), but within the circa 1925 to present period of significance provided by McAlester (2015).

According to the Modernism Context Statement, the International style was a major worldwide architectural trend of the 1920s and 1930s that reflects the formative decades of Modernism prior to World War II (City of San Diego 2007). Although the International style originated in western Europe, it transcended any national or regional identity because International-style architecture made no reference to local vernaculars or traditional building forms. The style quickly migrated to the United States as architects from Europe fled prior to World War II. In Los Angeles, immigrant architects Rudolph Schindler and Richard Neutra were instrumental in popularizing the International style. The International style is characterized by a radical simplification of form and a complete rejection of ornament. Common features of International-style architecture include square and rectangular footprints, simple cubic or extruded rectangular forms, horizontal bands of windows, and strong right angles. Prominent building materials include concrete, smooth stucco, brick, and glass.

According to the Modernism Context Statement, there are four “Primary” character-defining features of International construction. The following primary character-defining features noted in the Modernism Context Statement (City of San Diego 2007) have been specifically applied to the 11531 Downey Avenue building:

1. Flat roofs (cantilevered slabs or parapets)

The 11531 Downey Avenue building has flat roofs throughout the various sections. Its southwest façade features a single-story portion that is flat with a wide overhang while other sections feature flat roof sections with parapets.

Therefore, the building does possess this primary character-defining feature of International construction.

2. Lack of applied ornament

The 11531 Downey Avenue building features a corrugated metal siding datum at the tallest level, located atop a portion of the late-1970s addition. As this is Attachment I.D
Agenda Page 308

Cultural Resources Study for the YMCA Downey Project

3.0–46
a decorative feature and not purely for function, the building features applied ornament. Therefore, the building does not possess this Primary character- defining feature of International construction.

3. Horizontal bands of flush windows

The 11531 Downey Avenue building features horizontal bands of flush windows along portions of the southeast and northeast façades. As these are part of the late-1970s addition and not original to the building, the original building does not possess this Primary character-defining feature of International construction. Although the addition possesses this character- defining feature, it is not a stand-alone structure and is not considered significant in its own right.

4. Asymmetrical façades

All façades of the 11531 Downey Avenue building are asymmetrical, compared to themselves and each other. Therefore, the building does possess this Primary character-defining feature of International construction.

Summary: Of the four Primary character-defining features of International construction expressed in the Modernism Context Statement, the 11531 Downey Avenue building possesses three features.

According to the Modernism Context Statement, there are four “Secondary” character-defining features of International construction. The following Secondary character-defining features noted in the Modernism Context Statement (City of San Diego 2007) have been specifically applied to the 11531 Downey Avenue building:

1. Square corners

The 11531 Downey Avenue building features square corners. Therefore, the building does possess this Secondary character-defining feature of International construction.

Attachment I.D
Agenda Page 309

Cultural Resources Study for the YMCA Downey Project

3.0–47

2. Common exterior materials include concrete, brick, and stucco

The 11531 Downey Avenue building features concrete, red brick, and smooth stucco exterior walls. Therefore, the building does possess this Secondary character-defining feature of International construction.

3. Steel sash windows (typically casement)

The 11531 Downey Avenue building features steel sash, fixed-pane windows; however, none are casement. Therefore, the building does not possess this Secondary character-defining feature of International construction.

4. Corner windows

The 11531 Downey Avenue building does not feature any corner windows.

Each corner of the buildings consists of a wall terminus. Therefore, the building does not possess this Secondary character-defining feature of International construction.

Summary: Of the four Secondary character-defining features of International construction expressed in the Modernism Context Statement, the 11531 Downey Avenue building possesses two features.

In evaluating the potential significance and eligibility for the designation of International buildings, the Modernism Context Statement notes the following:

International-style buildings were generally built for commercial or institutional use. The 11531 Downey Avenue building was constructed as a recreation center and has been used as such since its 1963 construction.

Therefore, the building does not meet this evaluation criterion under the Modernism Context Statement.

The Modernism Context Statement further notes that “Location and setting are particularly relevant for International style resources which are institutional and related to a ‘campus’ environment, and the preservation of the surrounding site may be important to the overall significance of the resource” (City of San Diego 2007). 11531 Downey Avenue is not institutional in nature and is not considered part of a “campus” environment. The form and massing of the building does not “support[s] a campus civic structure, giving architectural definition to the campuses’ streets, quadrangles, and other open spaces” (UTSA Attachment I.D
Agenda Page 310

Cultural Resources Study for the YMCA Downey Project

3.0–48
Campus Master Plan 2014). In addition, the building façades also do not articulate “into constituent parts to mediate between the pedestrian scale and the scale of the building … [to] engage the landscape design of open spaces” (UTSA Campus Master Plan 2014). Therefore, the property also does not meet this evaluation criterion for designation under the Modernism Context Statement.

In summary, the 11531 Downey Avenue building possesses three out of four of the Primary character-defining features and two out of four of the Secondary character-defining features identified in the Modernism Context Statement (City of San Diego 2007) to be considered a true, significant, representative example of an International-style structure. The building does not meet the evaluation criteria in the Modernism Context Statement regarding the types of buildings generally designed in the International style in Southern California (institutional) and their campus-like settings (City of San Diego 2007) and does not possess a high degree of original integrity. As a result the building is not eligible for designation under CRHR Criterion 3.

• CRHR Criterion 4:

It has yielded, or may be likely to yield, information important in prehistory or history.

The research conducted for this study revealed that neither the 8268 Arnett Street, nor the 11525 and 11531 Downey Avenue properties are likely to yield any additional information about the history of the city of Downey or the state of California.

Therefore, none of the properties are eligible for designation under CRHR Criterion 4.

Findings and Conclusions
The 8268 Arnett Street and 11525 and 11531 Downey Avenue buildings are evaluated as not eligible for the CRHR. The residence and detached garage at 8268 Arnett Street, the commercial/office building at 11525 Downey Avenue, and the recreational building at 11531 Downey Avenue cannot be tied to the historic development of the neighborhood. Further, none of the properties are associated with significant individuals, significant architectural examples, nor are they able to provide more information with regards to the history of the city of Downey.

Because the buildings located at 8268 Arnett Street and 11525 and 11531 Downey Avenue are not eligible for listing on the CRHR, no site-specific mitigation measures are required for any future alterations or planned demolition of the buildings.

3.4 Discussion/Summary
The field survey identified one Minimal Traditional-style residence and detached garage, one Brutalist-style commercial/office building, and one International-style recreational building.

Attachment I.D
Agenda Page 311

Cultural Resources Study for the YMCA Downey Project

3.0–49
No other cultural resources were observed during the survey. The 8268 Arnett Street and 11525 and 11531 Downey Avenue buildings meet the age threshold to require historic structure evaluations to determine eligibility for the CRHR ; however, the buildings do not possess a high degree of integrity and are evaluated as not historically or architecturally significant under any CEQA criteria.

Attachment I.D
Agenda Page 312

Cultural Resources Study for the YMCA Downey Project

4.0–1

4.0 INTERPRETATION OF RESOURCE IMPORTANCE AND IMPACT

IDENTIFICATION

4.1 Resource Importance
The cultural resources survey of the YMCA Downey Project identified the 1963 YMCA recreational building at 11531 Downey Avenue (P-19-190639), the 1965 commercial/office building at 11525 Downey Avenue (Temp-1), and the 1947 single-family residence with a detached garage at 8268 Arnett Street (Temp-2). No other cultural resources were observed during the survey. The 11531 and 11525 Downey Avenue and 8268 Arnett Street buildings meet the age threshold to require historic structure evaluations to determine eligibility for the CRHR. The conclusion of the current assessment is that the buildings and structures are not CEQA-significant or eligible for listing on the CRHR. The buildings have been thoroughly recorded and no additional information can be derived from further analysis.

4.2 Impact Identification
The proposed development of the YMCA Downey Project will include the demolition of the buildings at 11525 Downey Avenue and 8268 Arnett Street as well as the partial demolition of the YMCA recreational building at 11531 Downey Avenue. However, the removal of these buildings as part of the development of the property will not constitute an adverse impact because the buildings have been evaluated as not CEQA-significant and not eligible for listing on the CRHR. The potential does still exist, however, that historic deposits may be present that are related to the use of this location since the 1920s. To mitigate potential impacts to unrecorded historic features or deposits, monitoring of grading by an archaeologist is recommended. The monitoring program is presented in Section 5.0.

Attachment I.D
Agenda Page 313

Cultural Resources Study for the YMCA Downey Project

5.0–1

5.0 RECOMMENDATIONS

The proposed development will impact the buildings at 11531 Downey Avnue (P-19- 190639), 11525 Downey Avenue (Temp-1), and 8268 Arnett Street (Temp-2); however, as these resources are evaluated as not CRHR-eligible, impacts have been determined to be not significant.

Based upon the evaluation of the buildings and structures as lacking further research potential, resource-specific mitigation measures will not be required as a condition of approval for the project. However, the property and surrounding area have contained structures since as early as 1928, cleared for the construction of the current buildings during the early to mid-twentieth century. When land is cleared, disked, or otherwise disturbed, evidence of surface artifact scatters is typically lost. Whether or not cultural resources other than the evaluated buildings and structures have ever existed on the YMCA Downey Project property is unclear. As such, the current status of the property appears to have affected the potential to discover any surface scatters of artifacts, and cultural materials that may have been on-site could have been masked by both disking and prior grading across the property.

Given that the prior development within the project might have masked archaeological deposits, and based upon the limited visibility during the survey, there is a potential that buried archaeological deposits may be present within the project boundaries. The presence of commercial and residential buildings and structures within the subject property further indicates that there is a likelihood for the presence of associated historic deposits below the ground surface. Based upon this potential, monitoring of grading is recommended to prevent the inadvertent destruction of any potentially important cultural deposits that were not observed or detected during the current cultural resources study. The proposed monitoring tasks are detailed below.

During Grading
A. Monitor(s) Shall be Present During Grading/Excavation/Trenching

1. The archaeological monitor shall be present full-time during all soil-disturbing and grading/excavation/trenching activities that could result in impacts to archaeological resources.

2. The principal investigator (PI) may submit a detailed letter to the lead agency during construction requesting a modification to the monitoring program when a field condition such as modern disturbance post-dating the previous grading/trenching activities, presence of fossil formations, or when native soils are encountered that may reduce or increase the potential for resources to be present.

B. Discovery Notification Process

1. In the event of an archaeological discovery, either historic or prehistoric, the archaeological monitor shall direct the contractor to temporarily divert all soil - disturbing activities, including but not limited to, digging, trenching, excavating, or grading activities in the area of discovery and in the area reasonably suspected to Attachment I.D
Agenda Page 314

Cultural Resources Study for the YMCA Downey Project

5.0–2
overlay adjacent resources, and immediately notify the Native American monitor and client, as appropriate.

2. The monitor shall immediately notify the PI (unless the monitor is the PI) of the discovery.

C. Determination of Significance

1. The PI shall evaluate the significance of the resource. If human remains are involved, the protocol provided in Section D, below, shall be followed. a. The PI shall immediately notify the City of Downey to discuss the significance determination and shall also submit a letter indicating whether additional mitigation is required.
b. If the resource is significant, the PI shall submit an Archaeological Data Recovery Program (ADRP) and obtain written approval from City of Downey to implement that program. In the event that prehistoric deposits are discovered, the ADRP should also be reviewed by the Native American consultant/monitor. Impacts to significant resources must be mitigated before ground-disturbing activities in the area of discovery will be allowed to resume. c. If the resource is not significant, the PI shall submit a letter to the City of Downey indicating that artifacts will be collected, curated, and documented in the final monitoring report. The letter shall also indicate that that no further work is required.

D. Discovery of Human Remains
If human remains are discovered, work shall halt in that area until a determination can be made regarding the provenance of the human remains; and the following procedures as set forth in CEQA Section 15064.5(e), the California PRC (Section 5097.98), and the State Health and Safety Code (Section 7050.5) shall be undertaken:

1. Notification

a. The archaeological monitor shall notify the PI, if the monitor is not qualified as a PI.
b. The PI shall notify the Coroner’s Division of the Los Angeles County Sheriff’s Department after consultation with the City of Downey, either in person or via telephone.

2. Isolate discovery site

a. Work shall be directed away from the location of the discovery and any nearby area reasonably suspected to overlay adjacent human remains until a Attachment I.D
Agenda Page 315

Cultural Resources Study for the YMCA Downey Project

5.0–3
determination can be made by the sheriff-coroner in consultation with the PI concerning the provenance of the remains.
b. The sheriff-coroner, in consultation with the PI, will determine the need for a field examination to determine the provenance.
c. If a field examination is not warranted, the sheriff-coroner will determine, with input from the PI, if the remains are or are most likely to be of Native American origin.

3. If Human Remains ARE determined to be Native American

a. The medical examiner will notify the NAHC within 24 hours. By law, ONLY the medical examiner can make this call.
b. The NAHC will immediately identify the person or persons determined to be the most likely descendent (MLD) and provide contact information. c. The MLD will contact the PI within 24 hours or sooner after the sheriff-coroner has completed coordination to begin the consultation process in accordance with CEQA Section 15064.5(e), the California PRC, and the State Health and Safety Code.
d. The MLD will have 48 hours to make recommendations to the property owner or representative for the treatment or disposition with proper dignity of the human remains and associated grave goods.
e. Disposition of Native American human remains will be determined between the MLD and the PI, and, if:

i. The NAHC is unable to identify the MLD; OR
ii. The MLD failed to make a recommendation within 48 hours after being notified by the NAHC; OR
iii. The landowner or authorized representative rejects the recommendation of the MLD and mediation in accordance with PRC 5097.94 (k) by the NAHC fails to provide measures acceptable to the landowner; THEN iv. Upon the discovery of multiple Native American human remains during a ground-disturbing land development activity, the landowner may agree that additional conferral with descendants is necessary to consider culturally appropriate treatment of multiple Native American human remains.

Culturally appropriate treatment of such a discovery may be ascertained from review of the site utilizing cultural and archaeological standards.

Where the parties are unable to agree upon the appropriate treatment measures, the human remains and grave goods buried with the Native American human remains shall be reinterred with appropriate dignity.

Attachment I.D
Agenda Page 316

Cultural Resources Study for the YMCA Downey Project

5.0–4

4. If Human Remains are NOT Native American

a. The PI shall contact the sheriff-coroner and notify them of the historic-era context of the burial.
b. The sheriff-coroner will determine the appropriate course of action with the PI and county staff (PRC 5097.98).
c. If the remains are of historic origin, they shall be appropriately removed and conveyed to Los Angeles County. The decision for internment of the human remains shall be made in consultation with County, the applicant/landowner, and any known descendant group.

Post-Construction
A. Preparation and Submittal of Draft Monitoring Report

1. The PI shall submit to City of Downey a draft monitoring report (even if negative) prepared in accordance with the agency guidelines, which describes the results, analysis, and conclusions of all phases of the archaeological monitoring program (with appropriate graphics).

a. For significant archaeological resources encountered during monitoring, the ADRP shall be included in the draft monitoring report.
b. Recording sites with the State of California DPR shall be the responsibility of the PI, including the recording (on the appropriate forms-DPR 523 A/B) any significant or potentially significant resources encountered during the archaeological monitoring program.

2. The PI shall submit a revised draft monitoring report to the City of Downey for approval, including any changes or clarifications requested by the City.

B. Handling of Artifacts

1. The PI shall be responsible for ensuring that all cultural remains collected are cleaned and cataloged.

2. The PI shall be responsible for ensuring that all artifacts are analyzed to identify function and chronology as they relate to the history of the area; that faunal material is identified as to species; and that specialty studies are completed, as appropriate.

3. The cost for curation is the responsibility of the property owner.

C. Curation of Artifacts

1. To be determined.

Attachment I.D
Agenda Page 317

Cultural Resources Study for the YMCA Downey Project

5.0–5
D. Final Monitoring Report(s)

1. The PI shall submit the approved final monitoring report to the City of Downey and any interested parties.

Attachment I.D
Agenda Page 318

Cultural Resources Study for the YMCA Downey Project

6.0–1

6.0 LIST OF PREPARERS AND ORGANIZATIONS CONTACTED

The archaeological survey program for the YMCA Downey Project was directed by Principal Investigator Jennifer R.K. Stropes, M.S., RPA. The archaeological fieldwork was conducted by staff archaeologist Mary Chitjian. The report text was prepared by Fabian Diaz Luevano, M.Arch., and Andrew J. Garrison, M.A., RPA. Report graphics were provided by Emily T. Soong. Technical editing and report production were conducted by Caitlin A.M. Foote. The archaeological records search was conducted by Emily T. Soong at the SCCIC at CSU Fullerton.

Attachment I.D
Agenda Page 319

Cultural Resources Study for the YMCA Downey Project

7.0–1

7.0 REFERENCES CITED

Altschul, Jeffery H. and Donn R. Grenda
2002 Islanders and Mainlanders: Prehistoric Context for the Southern California Bight. SRI Press, Tucson, Arizona.

Ancestry.com
2011 U.S., City Directories, 1822-1995 (database online). Lehi, Utah, USA: Ancestry.com Operations, Inc.

2014 California, U.S., Federal Naturalization Records, 1888-1991 (database online). Lehi, Utah, USA: Ancestry.com Operations, Inc.

2022 1950 United States Federal Census (database online). Lehi, Utah, USA: Ancestry.com Operations, Inc.

American Architects Directory
1956 American Architects Directory. Edited by George S. Koyl. American Institute of Architects. R.R. Bowker Company, New York, New York.

1970 American Architects Directory. 3rd edition. Edited by George S. Koyl and John F.

Gane. American Institute of Architects. R.R. Bowker Company (a Xerox Company), New York, New York.

Andrus, Patrick and Rebecca H. Shrimpton
2002 How to Apply the National Register Criteria for Evaluation. National Register Bulletin No. 15. National Register of Historic Places.

Baur, John E.
1959 The Health Seekers of Southern California. Huntington Library Publications, San Marino, California.

Bean, Lowell John and Charles R. Smith
1978 Gabrieliño. In California, edited by Robert F. Heizer, pp. 538-549. Handbook of North American Indians, Vol. 8. William C. Sturtevant, general editor, Smithsonian Institution, Washington, D.C.

Beattie, George W. and Helen P. Beattie
1939 Heritage of the Valley: San Bernardino’s First Century. Biobooks, Oakland, California.

Attachment I.D
Agenda Page 320

Cultural Resources Study for the YMCA Downey Project

7.0–2
Bonner, Wayne H. and Kathleen A. Crawford
1962 Direct APE Historic Architectural Assessment for T-Mobile West, LLC Candidate LA02994B (LA2994 Dowey YMCA), 11531 Downey Avenue, Downey, Los Angeles, California. Michael Brandman Associates. Unpublished report on file with South Central Coastal Information Center at California State University, Fullerton.

Bonner, Wayne H., Sarah A. Williams, and Kathleen A. Crawford 2013 Cultural Resources Records Search and Site Visit Results for T-Mobile West, LLC Candidate LA02994B (LA2994 Downey YMCA), 11531 Downey Avenue, Downey, Los Angeles County, California. Michael Brandman Associates. Unpublished report on file with South Central Coastal Information Center at California State University, Fullerton.

Brigandi, Phil
1998 Temecula: At the Crossroads of History. Heritage Media Corporation, Encinitas, California.

Brown, Christian
2011 Looking Back on… Downey Family YMCA. The Downey Patriot. 17 March:3.

Downey, California.

Brutalism:Online
N.d. Introduction to Brutalism. Electronic document, brutalism.online/brutalism, accessed December 2016.

Carbone, Larry A.
1991 Early Holocene Environments and Paleoecological Contexts on the Central and Southern California Coast. Hunter-Gatherers of the Early Holocene Coastal California, edited by Jon Erlandson and Roger Colten, pp. 11-16. Perspectives in California Archaeology, Vol. 1. Cotsen Institute of Archaeology, University of California, Los Angeles.

Caughey, John W.
1970 California: A Remarkable State's Life History. 3rd ed. Prentice-Hall, Englewood Cliffs, New Jersey.

Chapman, Charles E.
1921 A History of California: The Spanish Period. The Macmillan Company, New York.

City of Downey
N.d. City History & Profile. Electronic document, https://www.downeyca.org/our-city/city- profile, accessed April 2024.

Attachment I.D
Agenda Page 321

Cultural Resources Study for the YMCA Downey Project

7.0–3
City of San Diego
2007 San Diego Modernism Historic Context Statement. Submitted to the State of California Office of Historic Preservation.

Cook, Sherburne F.
1976 The Conflict Between the California Indian and White Civilization. University of California Press, Berkeley and Los Angeles, California.

Dudek
2022 Los Angeles County Metro Area Plan Project, Florence-Firestone Historic Context Statement and Survey Report. Report prepared for Los Angeles County Department of Regional Planning (LA County Planning) by Dudek. Report on file at the Los Angeles County Planning Department, Los Angeles, California.

Dumke, Glenn S.
1944 The Boom of the Eighties in Southern California. Huntington Library Publications, San Marino, California.

Engelhardt, Zephyrin
1921 San Diego Mission. James M. Barry Company, San Francisco, California.

Gnerre, Sam
2022 South Bay history: West Bay High School is the newest of Torrance’s 4 public high schools. Daily Breeze. 26 December. Hermosa Beach, California.

Heizer, Robert F. and Adam E. Treganza
1972 Mines and Quarries of the Indians of California. Ballena Press, Ramona, California.

Hillhouse, J.W., E.G. Reichard, and D.J. Ponti
2002 Probing the Los Angeles Basin: Insights into ground-water resources and earthquake hazards. U.S. Geological Survey Fact Sheet 086-02. Electronic document, https://pubs.usgs.gov/fs/2002/fs086-02/fs086-02.pdf , accessed December 9, 2019.

Johnson, Paul C., Dorothy Krell, John S. Weir, Harry Downie, Adrian Wilson, Joe Seney, Philip Spencer, and France Carpentier
1972 The California Missions: A Pictorial History. Sunset Books, Lane Publishing, Menlo Park, California.

Los Angeles Times
1974 Notice of Unclaimed Personal Property. 23 August:95. Los Angeles, California.

1975a Credit Union to Break Ground at Site in Downey. 3 April:175. Los Angeles, California.

1975b Brown & Associates Realtors. 2 November:274. Los Angeles, California.

Attachment I.D
Agenda Page 322

Cultural Resources Study for the YMCA Downey Project

7.0–4
1978 RE/MAX Properties. 13 August:10. Los Angeles, California.

Marshfield Clinic Health System YMCA
2024 Our History – A Brief History of the YMCA Movement. Electronic document, http://www.mfldymca.org/about_us/history_national.php , accessed April 2024.

McAlester, Virginia Savage
2015 A Field Guide to American Houses (Revised): The Definitive Guide to Identfying and Understanding America’s Domestic Architecture. Alfred A. Knopf, New York, New York.

Moratto, Michael J.
1984 California Archaeology. Academic Press, New York.

Natural Resources Conservation Service (NRCS)
2019 Web Soil Survey. Electronic document, https://websoilsurvey.sc.egov.usda.gov/ App/WebSoilSurvey.aspx, accessed April 2024.

Nevin, David
1978 The Mexican War. Time-Life Books, Inc., Alexandria, Virginia.

News-Pilot
1975 Hospital Log. 17 December:12. San Pedro, California.

Pacific Coast Architecture Database (PCAD)
2024 Leroy William Donley (Architect). Electronic document, https://pcad.lib.washington . edu/person/9098/, accessed April 2024.

Palisadian-Post
2008 Roy W. Donley, 94; Former Local Artist. 23 July. Canoga Park, California.

Pourade, Richard F.
1964 The Glory Years. Union-Tribune Publishing Company, San Diego.

Press-Telegram
1964 YMCA Design Pact Award. 9 March. Long Beach, California.

1985 Van Buren Associates, A Calif. Limited Partnership: Terry Debay. 14 August:102.

Long Beach, California.

1988 Tax Time. 25 January:21. Long Beach, California.

Rolle, Andrew F.
1963 California: A History. Harland Davidson, Inc., Wheeling, Illinois.

Attachment I.D
Agenda Page 323

Cultural Resources Study for the YMCA Downey Project

7.0–5
Saucedo, G.J., H.G. Greene, M.P. Kennedy, and S.P. Bezore 2016 Geologic map of the Long Beach 30' X 60' quadrangle, California (ver. 2.0). Electronic document, https://ngmdb.usgs.gov/Prodesc/proddesc_109539.htm , accessed April 2024.

Santa Fe Springs Library
N.d. City of Santa Fe Springs History. Electronic document, https://www.santafesprings . org/library/local_history/history/volume_6.asp, accessed February 8, 2019.

State Historic Preservation Office (SHPO)
1995 Instructions for Recording Historical Resources. Office of Historic Preservation, Sacramento.

Saylor Academy
2011 Brutalist Architecture. Electronic document, https://www.saylor.org/site/wp- content/uploads/2011/05/Brutalist-architecture.pdf, accessed December 2016.

The Tidings
1963 High School Started In Southeast L.A. 1 March:1. Los Angeles, California.

University of Texas at San Antonio (UTSA)
2014 Campus Master Plan Update. Electronic document, https://www.utsa.edu/masterplan/ , accessed August 2016.

Wallace, William J.
1955 A Suggested Chronology for Southern California Coastal Archaeology. Southwestern Journal of Anthropology 11:214-230.

1978 Post-Pleistocene Archeology, 9000-2000 B.C. In California, edited by Robert F.

Heizer, pp. 25-36. Handbook of North American Indians, Vol. 8. William C.

Sturtevant, general editor, Smithsonian Institution, Washington, D.C.

Warren, Claude N. (editor)
1968 Cultural Tradition and Ecological Adaptation on the Southern Coast, In: Archaic Prehistory in the Western United States, C. I. Williams ed. Eastern New Mexico University Contributions in Anthropology 1(3): 1-14.

Attachment I.D
Agenda Page 324

Cultural Resources Study for the YMCA Downey Project

APPENDIX A
Resumes of Key Personnel
Attachment I.D
Agenda Page 325

Andrew J. Garrison, M.A., RPA
Project Archaeologist
BFSA Environmental Services, a Perennial Company
14010 Poway Road  Suite A 
Phone: (858) 679-8218  Fax: (858) 679-9896  E-Mail: [email protected]

Education
Master of Arts, Public History, University of California, Riverside 2009 Bachelor of Science, Anthropology, University of California, Riverside 2005 Bachelor of Arts, History, University of California, Riverside 2005 Professional Memberships
Register of Professional Archaeologists
Society for California Archaeology
Society for American Archaeology
California Council for the Promotion of History
Society of Primitive Technology
Lithic Studies Society
California Preservation Foundation
Pacific Coast Archaeological Society
Experience
Project Archaeologist June 2017–Present BFSA Environmental Serives, A Perennial Company Poway, California Project management of all phases of archaeological investigations for local, state, and federal agencies including National Register of Historic Places (NRHP) and California Environmental Quality Act (CEQA) level projects interacting with clients, sub-consultants, and lead agencies. Supervise and perform fieldwork including archaeological survey, monitoring, site testing, comprehensive site records checks, and historic building assessments. Perform and oversee technological analysis of prehistoric lithic assemblages. Author or co-author cultural resource management reports submitted to private clients and lead agencies.

Senior Archaeologist and GIS Specialist 2009–2017 Scientific Resource Surveys, Inc. Orange, California Served as Project Archaeologist or Principal Investigator on multiple projects, including archaeological monitoring, cultural resource surveys, test excavations, and historic building assessments. Directed projects from start to finish, including budget and personnel hours proposals, field and laboratory direction, report writing, technical editing, Native American consultation, and final report submittal.

Oversaw all GIS projects including data collection, spatial analysis, and map creation.

Preservation Researcher 2009 City of Riverside Modernism Survey Riverside, California Completed DPR Primary, District, and Building, Structure and Object Forms for five sites for a grant- funded project to survey designated modern architectural resources within the City of Riverside.

Attachment I.D
Agenda Page 326

BFSA Environmental Services, A Perennial Company, 2
Information Officer 2005, 2008–2009 Eastern Information Center (EIC), University of California, Riverside Riverside, California Processed and catalogued restricted and unrestricted archaeological and historical site record forms.

Conducted research projects and records searches for government agencies and private cultural resource firms.

Reports/Papers
2019 A Class III Archaeological Study for the Tuscany Valley (TM 33725) Project National Historic Preservation Act Section 106 Compliance, Lake Elsinore, Riverside County, California.

Contributing author. Brian F. Smith and Associates, Inc.

2019 A Phase I and II Cultural Resources Assessment for the Jack Rabbit Trail Logistics Center Project, City of Beaumont, Riverside County, California. Brian F. Smith and Associates, Inc.

2019 A Phase I Cultural Resources Assessment for the 10575 Foothill Boulevard Project, Rancho Cucamonga, California. Brian F. Smith and Associates, Inc.

2019 Cultural Resources Study for the County Road and East End Avenue Project, City of Chino, San Bernardino County, California. Brian F. Smith and Associates, Inc.

2019 Phase II Cultural Resource Study for the McElwain Project, City of Murrieta, California.

Contributing author. Brian F. Smith and Associates, Inc.

2019 A Section 106 (NHPA) Historic Resources Study for the McElwain Project, City of Murrieta, Riverside County, California. Brian F. Smith and Associates, Inc.

2018 Cultural Resource Monitoring Report for the Sewer Group 818 Project, City of San Diego. Brian F.

Smith and Associates, Inc.

2018 Phase I Cultural Resource Survey for the Stone Residence Project, 1525 Buckingham Drive, La Jolla, California 92037. Brian F. Smith and Associates, Inc.

2018 A Phase I Cultural Resources Assessment for the Seaton Commerce Center Project, Riverside County, California. Brian F. Smith and Associates, Inc.

2017 A Phase I Cultural Resources Assessment for the Marbella Villa Project, City of Desert Hot Springs, Riverside County, California. Brian F. Smith and Associates, Inc.

2017 Phase I Cultural Resources Survey for TTM 37109, City of Jurupa Valley, County of Riverside. Brian F. Smith and Associates, Inc.

2017 A Phase I Cultural Resources Assessment for the Winchester Dollar General Store Project, Riverside County, California. Brian F. Smith and Associates, Inc.

2016 John Wayne Airport Jet Fuel Pipeline and Tank Farm Archaeological Monitoring Plan. Scientific Resource Surveys, Inc. On file at the County of Orange, California.

2016 Historic Resource Assessment for 220 South Batavia Street, Orange, CA 92868 Assessor’s Parcel Number 041-064-4. Scientific Resource Surveys, Inc. Submitted to the City of Orange as part of Mills Act application.

Attachment I.D
Agenda Page 327

BFSA Environmental Services, A Perennial Company, 3
2015 Historic Resource Report: 807-813 Harvard Boulevard, Los Angeles. Scientific Resource Surveys, Inc. On file at the South Central Coastal Information Center, California State University, Fullerton.

2015 Exploring a Traditional Rock Cairn: Test Excavation at CA-SDI-13/RBLI-26: The Rincon Indian Reservation, San Diego County, California. Scientific Resource Surveys, Inc.

2014 Archaeological Monitoring Results: The New Los Angeles Federal Courthouse. Scientific Resource Surveys, Inc. On file at the South Central Coastal Information Center, California State University, Fullerton.

2012 Bolsa Chica Archaeological Project Volume 7, Technological Analysis of Stone Tools, Lithic Technology at Bolsa Chica: Reduction Maintenance and Experimentation. Scientific Resource Surveys, Inc.

Presentations
2017 “Repair and Replace: Lithic Production Behavior as Indicated by the Debitage Assemblage from CA-MRP-283 the Hackney Site.” Presented at the Society for California Archaeology Annual Meeting, Fish Camp, California.

2016 “Bones, Stones, and Shell at Bolsa Chica: A Ceremonial Relationship?” Presented at the Society for California Archaeology Annual Meeting, Ontario, California.

2016 “Markers of Time: Exploring Transitions in the Bolsa Chica Assemblage.” Presented at the Society for California Archaeology Annual Meeting, Ontario, California.

2016 “Dating Duress: Understanding Prehistoric Climate Change at Bolsa Chica.” Presented at the Society for California Archaeology Annual Meeting, Ontario, California.

2014 “New Discoveries from an Old Collection: Comparing Recently Identified OGR Beads to Those Previously Analyzed from the Encino Village Site.” Presented at the Society for California Archaeology Annual Meeting, Visalia, California.

2012 Bolsa Chica Archaeology: Part Seven: Culture and Chronology. Lithic demonstration of experimental manufacturing techniques at the April meeting of The Pacific Coast Archaeological Society, Irvine, California.

Attachment I.D
Agenda Page 328

Cultural Resources Study for the YMCA Downey Project

APPENDIX A

Resumes of Key Personnel

APPENDIX B
Site Record Forms
(Deleted for Public Review; Bound Separately)
Attachment I.D
Agenda Page 329

Cultural Resources Study for the YMCA Downey Project

APPENDIX C
Archaeological Records Search Results
(Deleted for Public Review; Bound Separately)
Attachment I.D
Agenda Page 330

Cultural Resources Study for the YMCA Downey Project

APPENDIX D
NAHC Sacred Lands File Search Results
(Deleted for Public Review; Bound Separately)
Attachment I.D
Agenda Page 331

DATE: April 25, 2024
TO: Nicole Morse, T&B Planning, Inc.

FROM: Charlene So, Urban Crossroads, Inc.

JOB NO: 15985-01 TG Memo

YMCA DOWNEY TRIP GENERATION ASSESSMENT
Urban Crossroads, Inc. is pleased to provide the following Trip Generation Assessment for the YMCA Downey development (Project), located in the City of Downey. This trip generation assessment describes the proposed Project trip generation and determines whether any traffic operations analysis is required based on Los Angeles County’s Transportation Impact Analysis Guidelines (County Guidelines) dated July 23, 2020. Specifically, the purpose of the following trip generation assessment is to determine if any additional peak hour intersection operations analysis is required based on the County Guidelines. The County Guidelines have been utilized as the City does not have their own adopted guidelines.

PROPOSED PROJECT
The Project site is located at 11531 Downey Avenue which is northwest of Downey Avenue, south of Firestone Boulevard, and east of Paramount Boulevard (Assessor’s Parcel Numbers [APNs] 6255-013-032, -033, and -034). The site is currently developed with 3 structures totaling 61,756 square feet (3,254-square- foot building at 11525 Downey Avenue, 57,673-square-foot building at 11531 Downey Avenue, and 829-square-foot building at 8268 Arnett Street). The site was previously occupied by a YMCA which is currently not operational. The Project includes demolition of the existing structures on-site and developing an 18,808- square-foot gymnasium, 975-square-foot lobby/restrooms, and retrofitting of an approximate 7,625-square-foot existing gymnasium (total of 27,408 square feet).

A preliminary site plan for the proposed Project is shown in Exhibit 1. As indicated in Exhibit 1, access to the site will be accommodated via Downey Avenue and Arnett Street.

Attachment I.E
Agenda Page 332

Nicole Morse, T&B Planning, Inc.

April 25, 2024

Page 2 of 5 ends
← All documents from this meeting