Cities Index.
05. CIP No. 23-31 - Apprvl - Amend No. 1 to PSA w-TetraTech Bas, Inc for Proof Eng Srvcs - Rio San Gabriel Park

Downey City Council
September 24, 2024

Document
05. CIP No. 23-31 - Apprvl - Amend No. 1 to PSA w-TetraTech Bas, Inc for Proof Eng Srvcs - Rio San Gabriel Park
Meeting
September 24, 2024
Body
Downey City Council
Pages
8
Original file
39 KB
Text extracted from the city's file for reading and search. Open the original on lf.downeyca.org. That file is the official record.

Item No.

TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

FROM: OFFICE OF THE CITY MANAGER
BY: MATTHEW BAUMGARDNER, DIRECTOR OF PUBLIC WORKS/CITY

ENGINEER

DATE: SEPTEMBER 24, 2024

SUBJECT: APPROVAL OF AMENDMENT NO. 1 TO THE PROFESSIONAL SERVICES AGREEMENT WITH TETRA TECH BAS, INC. FOR

PROFESSIONAL ENGINEERING SERVICES FOR RIO SAN GABRIEL

PARK GREEN, SAFE AND ACTIVE PARK IMPROVEMENTS PROJECT
CAPIT AL IMPROVEMENT PROGRAM (CIP) NO. 23-31

EXECUTIVE SUMMARY

The City Council will consider approving an amendment to the professional engineering services agreement with Tetra Tech BAS, Inc. for the development of a Waste Footprint Workplan. Additionally, the amendment would extend the term of the agreement to December 31, 2025 and amend the budget of the agreement to accommodate the additional needs of the Rio San Gabriel Park Green, Safe and Active Park Improvements Project CIP No. 23-31.

RECOMMENDATION

That the City Council:

1. Approve Amendment No. 1 to the agreement with Tetra Tech BAS, Inc. for additional professional engineering services for the Rio San Gabriel Park Green, Safe and Active Park Improvements Project CIP No. 23-31; and

2. Authorize an appropriation in the amount of $130,000 from the General Fund – Fund Balance to the Capital Improvement Project Fund, CIP 23-31 Rio San Gabriel Park Green, Safe and Active Park Improvements Project; and

3. Authorize the City Manager, or his designee, to execute any and all amendments to the agreement as deemed necessary.

BACKGROUND

The California Department of Transportation (Caltrans) developed the Clean California Local Grant Program (CCLGP) to provide funds to local communities to beautify and improve local streets and roads, tribal lands, parks, pathways, and transit centers. The intention of the CCLGP is to add beautification measures in public spaces along with the

AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH TETRA TECH BAS, INC.

FOR PROFESSIONAL ENGINEERING SERVICES FOR RIO SAN GABRIEL PARK GREEN, SAFE AND ACTIVE PARK IMPROVEMENTS PROJECT CIP NO. 23-31
PAGE 2

removal of litter and debris. The CCLGP will enhance communities and improve spaces for public health, cultural connection, and community placemaking by improving public spaces for walking and recreation.

The City of Downey applied for a competitive statewide CCLGP grant for the Rio San Gabriel Park Green, Safe and Active Park Improvements Project (Project) and was awarded a grant in the amount of $749,405. In December 2022, the City Council adopted a Resolution authorizing the City Manager to execute agreements with Caltrans for the CCLGP grant for the Project.

The Project includes full depth pavement rehabilitation of both parking lots; new curbs, gutters and pavement; upgrade of pedestrian amenities such as damaged sidewalks, walkways, and access ramps; new decomposed granite trails/walkways with concrete curbs throughout the park perimeter joining all park amenities with the San Gabriel River regional bike path; bike path resting stations with shade structures, benches, bike racks, water bottle filing stations, and bike repair stations; solar-powered pedestrian lights and poles adjacent to park walkways and trails; a new gardens with wayfinding and educational signage; new shade structures with picnic stations; new waste containment area to hide and secure park dumpsters; and new trash receptacles throughout the park.

Rio San Gabriel Park is constructed on the former Downey Dump site which operated as an unclassified landfill from 1950 to 1955 and was closed prior to the promulgation of any solid waste regulations. Although it has been closed for nearly 70 years, the Downey Dump, along with all former landfills, is regulated by the County of Los Angeles Department of Environmental Health acting as the local enforcement agency (LEA) for the California Department of Resources Recycling and Recovery (CalRecycle). All former landfills are required to seek approval from the LEA and CalRecycle prior to any substantial development of the site. Additionally, while the State Water Board (Board) does not oversee landfills, the LEA and CalRecycle require that the Board reviews such projects for their potential impacts to the groundwater supply and are given an opportunity to assign conditions to a project should potential impacts be found.

ANALYSIS

On January 31, 2024, City staff met with the LEA and CalRecycle to identify the requirements for approval of the Project. The agencies advised the City to seek out a consultant to prepare a Post Closure Land Use Plan (PCLUP), an environmental plan/report outlining what impacts, if any, the Project would have on the existing waste footprint beneath the park.

On May 20, 2024, after procuring proposals consistent with the City’s Purchasing Policy, the City of Downey entered into a contract under the City Manager’s authority with Tetra Teach BAS, Inc. (Tetra Tech) to prepare a PCLUP to comply with the aforementioned State regulations and direction.

AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH TETRA TECH BAS, INC.

FOR PROFESSIONAL ENGINEERING SERVICES FOR RIO SAN GABRIEL PARK GREEN, SAFE AND ACTIVE PARK IMPROVEMENTS PROJECT CIP NO. 23-31
PAGE 3

On July 2, 2024, City Staff met with Tetra Tech, the State Water Board, the LEA and CalRecycle to review Tetra Tech’s proposed scope of work and ensure it would meet the agencies’ requirements. During the meeting, the three (3) agencies advised that a broader scope of work would be required, specially the need to develop a Waste Footprint Workplan prior to the preparation of the PCLUP.

Tetra Tech submitted an additional scope of work to incorporate the development of a Waste Footprint Workplan consistent with the agencies’ direction. Staff recommends approval of Amendment No. 1 with Tetra Tech (Attachment A), which will allow Tetra Tech to commence with the aforementioned environmental services. The cost of the additional scope of work is $179,360, bringing the total contract amount to $219,380. $49,360 of this amount was previously budgeted though a local match project fund, resulting in $130,000 needing to be appropriated for the additional work.

Following approval by the City Council, the anticipated timeline of the review process by LEA/CalRecylce is as follows:

City submits Waste Footprint Workplan October 2024
Approval of Work Plan December 2024
City submits Waste Footprint April 2025
Review and approval of Waste Footprint June 2025
City prepares and submits of PCLUP July 2025
Review and comments of PCLUP October 2025
City submits second PCLUP October 2025
Approval of PCLUP December 2025
City revises construction plans per LEA/CalRecycle findings December 2025 Begin Project Construction January 2026

CITY COUNCIL PRIORITIES

Quality of Life, Safety & Infrastructure

FISCAL IMPACT

Approval of the recommended actions will result in an expenditure of $49,360 from Account No. 40-1-6908 as budgeted in the Fiscal Year 2024-2025 Capital Improvement Program (CIP). Additionally, the recommended actions will result in an appropriation of $130,000 from the General Fund – Fund Balance to Special Revenue, Rio San Gabriel Park Green, Safe and Active Park Improvements Project CIP No. 23-31 for FY 2024- 2025. There are sufficient capital funds for the recommended actions

AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT WITH TETRA TECH BAS, INC.

FOR PROFESSIONAL ENGINEERING SERVICES FOR RIO SAN GABRIEL PARK GREEN, SAFE AND ACTIVE PARK IMPROVEMENTS PROJECT CIP NO. 23-31
PAGE 4

ATTACHMENTS

Attachment A: Amendment No. 1 to the Professional Services Agreement with Tetra Tech BAS, Inc.

ATTACHMENT A

AMENDMENT NO. 1 TO

PROFESSIONAL SERVICES AGREEMENT
WITH TETRA TECH BAS, INC.

FOR PROFESSIONAL ENGINEERING SERVICES
THIS AMENDMENT No. 1 (“Amendment”) iS entered into this 24th day of September, 2024, by and between the City of Downey, a California municipal corporation and charter city (“City”) with its principal place of business at 11111 Brookshire Avenue, Downey, CA 90241 and Tetra Tech BAS, Inc, a California C corporation ("Consultant'’), with its principal place of business at 21700 Copley Drive, Suite 200, Diamond Bar, CA 91765. City and Consultant are sometimes individually referred to as the “Party” and collectively as the “Parties”.

WHEREAS, City and Consultant entered into a Professional Services Agreement (“Agreement”) on May 20, 2024 for professional engineering services for the Rio San Gabriel Park Project CIP 23-31 as more specifically described in the Agreement; and WHEREAS, the parties desire to make certain amendments to the Agreement as set forth herein; and
WHEREAS, the Parties intend to be bound by the terms and provisions of the Agreement as it is amended herein.

NOW, THEREFORE, for and in consideration of the mutual covenants and conditions herein contained, the Parties agree as follows:

Section 1. AMENDMENT(S).

A. City and Consultant hereby amend Section 3.3.1 (“General Scope of Services”) of the Agreement to read in its entirety as follows:
“3.1.1 General Scope of Services. Consultant promises and agrees to furnish to City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional engineering services necessary for the Project ("Services").

The Services are more particularly described in Exhibit "A’' attached hereto and incorporated herein by reference. Consultant also agrees to provide additional services, which are to be performed as part of the Services under this Agreement. These additional services are more particularly described in Exhibit “D”. All Services shall be subject to, and performed in accordance with, this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations.” B. City and Consultant hereby amend the Agreement to add and hereby incorporate by reference Exhibit “D” (Proposal for Professional Engineering Services – Provide Engineering Support and Field Services for the Rio San Gabriel Park (Downey Dump - SWIS #19-AA-5382) dated July 18, 2024), a copy of which is attached to this First Amendment, to reflect additional services to be provided by the Consultant as part of the Services under the Agreement.

C. City and Consultant hereby amend Section 3.1.2 (“Term”) of the Agreement to read in its entirety as follows:
“3.1.2 Term. The term of this Agreement shall be from May 20, 2024 to December 31, 2025, unless earlier terminated as provided herein. Consultant shall complete the Services within 1 the term of this Agreement, and shall meet any other established schedules and deadlines. The term of this Agreement may be extended by written amendment to this Agreement signed by the City Manager and the Consultant.”
D. City and Consultant hereby amend Section 3.3.1 (“Compensation”) of the Agreement to read in its entirety as follows:
“3.3.1 Compensation. Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibits "“C” and "D” attached hereto and incorporated herein by reference. The total compensation for all Services shall not exceed Two Hundred Nineteen Thousand Three Hundred Eighty Dollars ($219,380) for Rio San Gabriel Park Project CIP No. 23-31 without written approval of the City Extra Work may be authorized, as described below, and if authorized, said Extra Work will be compensated at the rates and manner set forth in this Agreement.” Section 2. The rights, obligations and fees of the Parties under the Agreement shall not otherwise be amended, altered or revised except as expressly provided for herein and all other terms of the Agreement shall remain in full force and effect.

Section 3. This Amendment may be executed in counterparts, each of which shall be deemed an original, but all of which, together, shall constitute one and the same instrument.

TO EFFECTUATE THIS AMENDMENT No. 1, the Parties have caused their duly authorized representatives to execute this Amendment to the Agreement on the dates set forth below
City: City of Downey Consultant: Tetra Tech BAS, Inc.

By:

Mario Trujillo, Mayor
Date 8/7 g/e/
ATTEST:

By
Maria Alicia Duarte, CMC, City Clerk
APPROVED AS TO FORM:

EXHIBIT D

uoyL{3aleJlal 892 1 96£'606 xeJ LLLL -098 606 lal
592 16 VO --8 P.'.'u-!a I OOZ al„'S ';„!'a /;Ido3 OO£ IZ q 3al eJ3al
's91+sIJopeJeq9 'saIjI}uenb s,a+seM '6-a) spodaJ leojJO Islq +ueAajOJ KIte!;ue+od Jay;o puc uo!+eLuioju! JOde/\ Ilos 'sHodaJ le9luy30+oo6 opnlou! AeLU yOjqM eHS ay; JOJ e;ep olqeljCAe o}enle/\a IIjM goal eJ;al -oPS aLj+ +e (sase6 JOde/\ Ilos Jay lo pue aueq}aLU -o!) -)]] 6u!+lnseJ pue alseM pllos JO e9uasaJd aLl) ol 6uljeloi Ajlo aq) Aq pepIAOJd elep alls 6u! Islxo JO uo!}enleAa puc MOjAaJ aq) sopnl9u! Hsel sIHI e+ea 6u!+slx3 JO MajAaU – L Hsel
slsAleuV S+ILUI I o}seAA dem/o;oqd lejJOV – 8 lsel
s6ulPuIJ JO podaU – Z Hsel
puc :6UIJO}!UOm SUOjSSjLUg aoc)inS snoeue+ue+suI – 9 qsel :slsAleuv qe 1 puc 6ulldLues JOde/\ IloS – 9 Hsel
:saqoJd JOdeA IloS JO 6UjJO+!UOm – V Hsel
:SOqOJd 6UIJO+lUOIN JOdeA IloS JO uo!+elletsul – C Hsel :lenILuqnS puc uolteJedaJd ueld HJOAA – Z Hsel
leIca 6ul+slx3 JO Me!/\oN – L Hsel
MOjOq
SHse} aq) ul pozIJeLULuns sl (MOS) HJOAA JO od09S pe+senbai aHI 'q30l eJ+al puc A+!') aHI uaaM}eq suolssnoslp }ua30J uo poseq SHse+ pasodOJd OHI podOjOAOP puc lesodOJd slq) poJedOJd seq qool alal -a)IS aq) ;e o;seM JO SjILUII oql 6u!}eLU IIse JO+ sqdei6oloqd leIiac puc e+ep OjJO;Sjq Me!/\aJ IIjM goal eJ;al 'uol+lppe ul '+oaJaq} Noel io 'oioqdSOLu+e OH) olu! ') II JO SUOjSSjLUO aoc)ins a/\!ssooxa JO OOUOSOJd au) JO/puc 'a+lsJJO uol}ei6ILU 09e+insqns Ie!)ua lod pue ')JI/oueq}aLU JO oouosoid oy+ 6ujpJe6oJ aHS eq) ssasse pue uo!}etuJOJu! )ualowns OpjAOJd IIjM MOjaq HJOM JO ad09s pasodoid aq) saAallaq gaol ei)al 3d09S 193fOUd
a+IS aq) WOJJ SUOISS fLue 03%ins
JO/pue uol+eJ6ILU (')JI) se') llupue] Ie!;ua;od puc a+seM ll!+puel JO s)!tuII AlaNII o+enleAO ol poJjnbOJ HJOM aq) soqjJOsap lesodOJd sIHI '}sonbOJ s,A+!9 ay; o; asuodsaJ u! poJedaJd seM HioM JO ad09s slql -elujo+IIe'.) 'AouMoa u! 'AeMoeJ J 909 aq) puc pieAOjno8 auo+soJ! J ieou (a) IS) (dbuna AauMoa AjJOLujoJ) Hjed IOjJqe') ues oIH aq) +e SOOjAJOS play pue 6ujJoau16ua OpjAOJd ol lesodoid slq) q+!M (A)!o) }uoLupedoc] SHJOAA Oljqnd Aau#\oa JO A+l’) ap!/\old o) poseold s! (goal npl) '9ul 'svg 'goal eJ lol :unoV -Jm Jea(I
BIUJo+1Ie')
'A3uMO(J u! (28€,s-w-61# SiMS - dunG AouMO(.]) >lied loliqe') ues oIN aq) lo) soojhlos PloIJ pue uoddns 6ulioou16u3 opjAord – soolmas 6ulroou16u3 leuolssojoJd roJ lesodoid : aN L?Z06 VO 'AouMoa
OnUOAV aJIqSqOOJg LLb L L
KOUMOa JO All'.-)
;uoLupedaCI SHioAA 91lqnd
Jaaul6u I ljA!'.-) ledjOUjJd LUjJajUl
3'd 'unoV uelqeJ -Jm
VZOZ 'gl AInF
H311 vu131 ha

Proposal for Professional Engineering Services – Provide Engineering Support and Field Services for the Rio San Gabriel Park (Downey Dump - SWIS #1 9-AA-5382) in Downey, California July 18, 2024
lateral and vertical extents, etc.), waste disposal manifests, permits, and Site as-builts including existing utilities. It is assumed that Tetra Tech will provide the City with a list of requested information and the City will provide all available information. No time and effort have been included at this time for Tetra Tech to conduct an outside landfill gas data/information request. This initial effort will allow Tetra Tech to provide the City with a preliminary assessment of potential LFG surface emissions and/or subsurface migration from buried solid waste that may be occurring at the Site. Tetra Tech will utilize the field sampling activities discussed in Task 3 and Task 4 below to try and further determine if there is potenttat methane and Volatile Organic Compounds (VOCs) migration or surface emissions from the Site
Task 1 – Deliverables, Meetings, and Conference Calls:

The following summarizes the work products to be prepared and submitted for this task:
– Review and evaluation of existing Site data and a summary to assist in the preparation of a Work Plan and for inclusion in the Report of Findings (Report) described in Task 6 below.

Task 2 – Work Plan Preparation and Submittal
Upon receiving approval to proceed from the City and receipt of requested background information, Tetra Tech will prepare a Work Plan for the proposed field activities including the conceptual design and installation of the temporary soil vapor monitoring probes (probes), subsequent monitoring and sampling criteria for these probes, and instantaneous surface emission monitoring at the Site. The design of the soil vapor monitoring probes will adhere to the design criteria (depth and spacing) in Title 27 California Code of Regulations (CCR) section 20925
The following items will be included in the Work Plan:
e
•
Project Team ;
Proposed temporary monitoring probe location plan and details including the following sheets:
o Title sheet;
o Existing Site Plan;
o Proposed Probe Construction Site Plan;
o Probes Construction Detail and Drilling Schedule; and o Details (one sheet);
•
•
•
•
Procedures for surface emissions and probe monitoring fncluding instrumentations utilized, sampling, lab testing, and frequency;
Analytical lab test methods and protocols;
Health and safety; and
Description of aerial photo/map waste limit analysis.

The draft Work Plan for the monitoring probes conceptual design, field work, and monitoring efforts will be electronically submitted as a Portable Document Format (PDF) to the City for review and one (1 ) round of comments. Tetra Tech will incorporate the comments from the City and submit a PDF of the final Work Plan to the Los Angeles County Solid Waste Local Enforcement Agency (LEA) for review and approval. Tetra Tech will incorporate one (1) round of regulatory comments and submit a PDF of the final Work Plan to LEA for approval.

Page 2 of 8 ends

Proposal for Professional Engineering Services – Provide Engineering Support and Field Services for the Rio San Gabriel Park (Downey Dump - SWIS #19-AA-5382) in Downey, California July 18, 2024
Monitoring locations are recommended to be surveyed and marked. Tetra Tech has not included surveying services in this proposal. Unless the City provides a surveyor to mark the locations, Tetra Tech is proposing to utilize visual identification and hand-held global positioning satellite (GPS) device with standard civilian accuracy to identify the monitoring probe location coordinates Task 2 – Deliverables, Meetings, and Conference Calls:

The following deliverables and activities will be completed under this task:
- Preparation and electronic submittal of the draft Work Plan as a PDF to the City for review and cornrnents;
One (1) teleconference caII with the City to discuss comments and approach; Incorporation of comments from the City’s review and electronic submittal of the Work Plan as a PDF to the LEA; and
Incorporation of potential comments from the LEA and electronic re-submittal of updated final Work Plan as a PDF to the LEA.

Task 3 – Installation of Soil Vapor Monitoring Probes
This task includes the installation of up to four (4) soil vapor monitoring probes (8 probe casings total) at strategic locations along the perimeter of the Site that will be identified in the Work Plan discussed in Task 2 above. It is assumed that a hollow stem auger drill rig will be utilized for drilling. Prior to drilling, Tetra Tech will coordinate with Dig Alert and will utilize a geophysicist to identify any potential utilities in the area, so they are not intercepted during drilling activities. This proposal assumes an encroachment permit will be obtained by the City. Each probe will be constructed with %-inch diameter Schedule 40 screened and solid polyvinyl chloride (PVC) pipe. Additionally, each probe will be installed to a depth of 30 feet below grade and will include 2 probe casings (shallow and deep). A bentonite seal will be installed near the ground surface to prevent air intrusion and water infiltration into the probe casings and between the shallow and deep probe casings. The soil vapor monitoring probes will be finished with an Asahi labcock valve within a flush mounted circular concrete vault. The probes can then be used to monitor subsurface gasses to identify any potential subsurface migration of LFG. The soil vapor monitoring probes will be installed in strategic locations along the perimeter to allow for the collection of data needed to aid in the assessment of potential LFG subsurface migration at the Site.

Tetra Tech will utilize a state-licensed drilling contractor to drill and install the soil vapor monitoring probes into the ground a depth of 30 feet below grade surface. This proposal assumes all four (4) probe locations will be installed within three (3) days inclusive of mobilization and demobilization.

Task 3 – Deliverables, Meetings, and Conference Calls:

The following deliverables and activities will be completed under this task:

Installation of four (4) push probes (8 probe casings total) using a hollow stem auger drill rig per the conceptual probe design included in the LEA approved Work Plan (Task 2); and Preparation and submittal of letter including drilling boring logs and probe construction details to City and LEA.

Task 4 – Monitoring of Soil Vapor Probes
Upon installation of the soil vapor probes, initial monitoring of the probes will be completed using a portable LFG analyzer unit (QED GEM-5000 or equivalent) and a photoionization detector (PID) within 24 to 48 hours after installation. These instruments will be used to measure the probe static pressure, gas temperature, methane, carbon dioxide, oxygen and Volatile Organic Compounds (VOC) concentrations from each of the probe casings as noted below. After the initial monitoring event, Tetra

Page 3 of 8 ends

Proposal for Professional Engineering Services – Provide Engineering Support and Field Services for the Rio San Gabriel Park (Downey Dump - SWIS #1 9-AA-5382) in Downey, California July 18, 2024
Tech will continue monitoring these probes for a period of three months on a monthly basis to determine if any potential LFG may be migrating away from the Site. Tetra Tech will summarize the findings of each monitoring event and will submit to the City and LEA as described in a letter report.

The initial summary and following three-monthly summaries of the monitoring probes monitoring/sampling results will include the following:
•
•
The concentrations of methane, carbon dioxide, oxygen, balance gas and VOCs, as measured in each probe casing within each probe location;
The documentation of date, time, barometric pressure, atmospheric temperatures, general weather conditions, and probe’s static pressure at the time of probe monitoring and/or probe sample collection;
The names of monitoring/sampling personnel, field instrument(s) utilized, and a brief description of the methods used; and
An identification numbering system to correlate monitoring results to a corresponding probe location.
•
•
Please note that lab samples further described in Task 5 below will have to be collected and lab- analyzed for trace gas concentrations as the field instruments used for probe monitoring typically do not have the capability of analyze speciated trace gas concentrations in LFG.

Once the monitoring and sampling activities are completed, the probes can be formally abandoned under a separate contract
Task 4 – Deliverables, Meetinqs, and Conference Calls:

The following deliverables and activities will be completed under this task:

Perform initial monitoring of all monitoring probes within 24 to 48 hours after installation, and once a month for a three-month period after installation; and Electronic submittal of the initial and monthly monitoring letter reports as PDFs to the City and LEA
Task 5 – Soil Vapor Sampling and Lab Analysis
Tetra Tech will collect initial gas samples from the eight (8) newly installed perimeter probe casings within 24 to 48 hours of installation and will submit the samples to a laboratory for analysis. Prior to collecting the gas samples, Tetra Tech will monitor the perimeter probes using a portable LFG analyzer (GEM-5000 or equivalent) and a PID as stated in Task 4. Prior to sampling each probe, Tetra Tech will evacuate the probe until the methane concentration remains constant for at least 30 seconds. Tetra Tech will coordinate with a certified analytical testing laboratory to have ten (10), 10-liter, helium passivated Summa gas sampling canisters shipped to Tetra Tech. Eight (8) of the Summa canisters will be used to collect the gas samples utilizing one (1) Summa canister per probe casing (2 summa canisters will be obtained as spares in case there are any leaks or issues with any of the other canisters)
The probe sampling will be completed using a sampling train designed to collect gas samples. The sample train will be configured to begin sampling while minimizing ambient air intrusion and the Summa canister valve connected to the sample train opened. The gas samples will be collected through a flow meter at a rate of approximately 500 milliliters per minute (mLJmin) or less until one liter of sample gas is obtained, at which point the valves will be closed and the Summa canister removed from the sample train
The Summa canisters will be sent to the testing laboratory to be analyzed within 72 hours of collection, for quality-assured analytical analysis with an accompanying chain-of-custody form to confirm sample

Page 4 of 8 ends

Proposal for Professional Engineering Services – Provide Engineering Support and Field Services for the Rio San Gabriel Park (Downey Dump - SWIS #1 9-AA-5382) in Downey, California July 18, 2024
integrity. Shipping costs for the Summa canisters are included in this proposal. Probes will be sampled for the following constituents:
• Speciated Volatile Organic Compounds (VOCs) via U.S. Environmental Protection Agency (EPA) Method TO-15; and
• Fixed Gases (Methane, Carbon Dioxide, Oxygen, Nitrogen).

Task 5 – Deliverables, Meetings, and Conference Calls:

The following summarizes the items to be performed for this task:

Initial sampling of the eight (8) perimeter probe casings utilizing eight (8) Summa canisters (samples) sent to an analytical laboratory for testing. Two (2) additional Summa canisters will be obtained as spares in case they are needed during sampling; and Obtain lab analysis results of the EPA Method TO-15 and Fixed Gases analysis of the eight (8) probe samples for inclusion in the Report of Findings (Task 7).

Task 6 – Instantaneous Surface Emissions Monitoring
Tetra Tech will complete instantaneous Surface Emissions Monitoring (SEM) across all accessible portions of the Site using a flame ionization detector (FID or equivalent) to measure TOC concentrations per South Coast Air Quality Management District (SCAQMD) Rule 1 150.1. The entire surface of the Site will be walked by a field technician in a serpentine pattern recording instantaneous measurements of TOC concentrations immediately above the surface and any readings exceeding the 500 parts per million by volume (ppmv) regulatory limit for TOC. All readings above 20 ppmv will be recorded and generally located on a map. The FID probe will be held within three inches of the surface while traversing. A surface inspection will also be performed during instantaneous surface emissions monitoring to identify cracks or fissures in the cover that could be potential pathways for LFG to escape to the atmosphere. Tetra Tech will monitor the surface at identified surface cracks, around existing utility boxes and other structures, as needed. Instantaneous surface emissions monitoring will be completed once per month for a period of three (3) months.

Task 6 – Deliverables, Meetinqs, and Conference Calls:

The following deliverables and activities will be completed under this task:
- Complete instantaneous surface emissions monitoring using an FID once a month for a three- month period; and
- Electronic submittal of monthly monitoring reports as PDFs to the City and LEA Task 7 – Report of Findings
Tetra Tech will prepare a draft report of findings that will be provided to the City in a PDF for review and one round of comments. The draft report will include: an executive summary (with results), introduction (with history and purpose of the work), sampling and analytical procedures, sampling locations and methods, laboratory analyses and analytical results, and appendices. The appendices will include the field monitoring data, probe boring and construction logs, and laboratory test results. The report will be submitted to the City monthly following each month’s monitoring event. This will lead to a final report at the end of the project with all three (3) months’ worth of data.

Upon approval of the final report, Tetra Tech will produce one PDF file of the final report to be sent to the City
Task 7 – Deliverables, Meetings, and Conference Calls:

The following deliverables and activities will be completed under this task:

Page 5 of 8 ends

Proposal for Professional Engineering Services – Provide Engineering Support and Field Services for the Rio San Gabriel Park (Downey Dump - SWIS #1 9-AA-5382) in Downey, California July 18, 2024
Electronic submittal of the draft report of findings as a PDF to the City for review; One (1) one-hour teleconference to discuss the draft report of findings with the City to be conducted via Teams;
Incorporation of comments from the City’s review and electronic submittal of the Work Plan as a PDF to the LEA;
One (1) one-hour teleconference to discuss the report of findings with the LEA and City to be conducted via Teams; and
Incorporation of potential comments from the LEA and electronic re-submittal of updated final Work Plan as a PDF to the LEA.

Task 8 – Aerial Photo/Map Analysis
Tetra Tech will collect reasonably available historic photos and maps to help identify the horizontal limits of waste at the site. An Environmental Data Resource (EDFR) report will be procured to provide the photos and maps of the site. Pertinent information will be digitized and mapped over existing conditions to help establish historic waste operation limits. A draft and final report on the outcome of the analysis will be provided. The draft report will include: an executive summary (with results), introduction (with history and purpose of the work), analytical results, and appendices with collected maps and photos.

Upon approval of the draft report, Tetra Tech will produce one PDF file of the final report to be sent to the City
Task 7 – Deliverables, Meetings, and Conference Calls:

The following deliverables and activities will be completed under this task:

One (1) one-hour teleconference to discuss the draft report with the City to be conducted via Teams
Incorporation of comments from the City’s review and electronic submittal of the report as a PDF to the LEA
One (1) one-hour teleconference to discuss the report with the LEA and City to be conducted via Teams; and
Incorporation of potential comments from the LEA and electronic re-submittal of updated final report as a PDF to the LEA.

BUDGET
Tetra Tech proposes to perform the scope of work on a Time and Material (T&M) basis in accordance with the Schedule of Charges within our most recent Agreement for Professional Engineering Consulting Services with the City.

For this project, Tetra Tech will invoice according to the completed portion of the respective tasks/subtasks, as per the not-to-exceed budgets shown. Charges for services that are not a part of the proposed scope of work and are not included in the budget estimate will be billed on a T&M basis. Out of scope services will not be completed without prior authorization from the City

Page 6 of 8 ends

Proposal for Professional Engineering Services – Provide Engineering Support and Field Services for the Rio San Gabriel Park (Downey Dump - SWIS #1 9-AA-5382) in Downey, California July 18, 2024
Task Other Direct
Costs
Task 1 – Review of Existing Data $4,879 $4,879
Task 2 – Work Plan Preparation and Submittal $19,598 $19,598 Task 3* – Installation of Soil Vapor Monitoring Probes $8,273 $14,734
$3,704
$6,634
$15,234
$30,450
$103,506
$67,970
$1 ,400
$4,853
$431
$76,243
$16, 134
$8,557
$7, 065
$15,234
$31 ,650
$179, 360
Task 4* – Monitoring of Soil Vapor Probes
Task 5* – Soil Vapor Sampling and Lab Analysis
Task 6* – Instantaneous Surface Emissions Monitoring
Task 7* – Report of Findings
Task 8 – Aerial Photo/Map Analysis $1 ,200
$75,854Total
'’Tasks 3 through 7, are included as budgetary estimates and will need to be revised/updated upon the LEA’s final approval of the proposed Work Plan.

The estimated cost and proposed SOW are based on information available to Tetra Tech at this time. If conditions change, unforeseen circumstances are encountered, or work efforts are redirected, the cost estimate may require modification.

ASSUMPTIONS
Tetra Tech made the following assumptions while preparing the project SOW, budget and schedule

1.The City will provide Tetra Tech all necessary and up to date documents, including the utilities as-built information, topography, applicable data, limits of waste, and all necessary information in AutoCAD, MS Word®, and/or MS Excel® electronic format to complete the proposed scope of Tetra Tech’s efforts are contingent upon adequacy of available information Topographic park contours provided by the City are
The most recent available;
Georeferenced to the current site coordinate system; and c. Properly created as polylines with elevation attributes.

Limits of waste or delineation is not included in this scope of work and is assumed to be provided by the City in the Site historical information documents. Horizontal waste limits will be estimated Installation of the four (4) perimeter probes (8 probe casings total) are to be completed via a hollow stem augur drill rig. Assumes one (1) Tetra Tech field technician and one (1) drilling field technician will travel to the site to as part of the probe installation. This assumes probe installation can be completed within three (3) days inclusive of mobilization and demobilization.

Prior to drilling, Tetra Tech will coordinate with Dig Alert and will utilize a geophysicist to identify any potential utilities in the area so they are not intercepted during drilling activities. This proposal assumes an encroachment permit will be obtained by the City.

Underground utilities as-builts shall be provided in CAD or clearly marked prior to construction; work
a
b
2 3

4. 5
6 7

Page 7 of 8 ends

Proposal for Professional Engineering Services – Provide Engineering Support and Field Services for the Rio San Gabriel Park (Downey Dump - SWIS #1 9-AA-5382) in Downey, California July 18, 2024

8. Clearing and grubbing of the proposed probe locations is not included in this proposal and is assumed to be done by others prior to construction mobilization

9. Tetra Tech will perform probe monitoring utilizing a LFG analyzer unit (GEM-5000 or equivalent) This assumes one (1) person will be on site for one (1) day for the initial monitoring (ie. 24 to 48 hours after probe installation) and the following monthly monitoring events over a three-month monitoring period.

10. Tetra Tech to perform probe sampling during the initial monitoring event only. Gas samples will be submitted to an analytical laboratory to be analyzed for VOCs, methane, and other LFG constituents on a standard turn-around-time. No other tests not specifically mentioned are included at this time, these tests can be added per additional scope and budget if desired by the City

11. Permitting fees are not included in the scope of work. If any permitting or fees are required, these services can be provided under a separate scope of work or completed by others

12. Surveying is not included in the scope of work (assumed to be provided by the City or completed via handheld GPS)

13. Tetra Tech is not responsible for the accuracy of site information provided by others.

14. All letter reports to be submitted to the City within 30 days from any sampling activities

15. Tetra Tech will be responsible for work to the extent of task/subtask and labor hours included in the task budget/cost estimate. Tetra Tech reserves the right to revise our pricing if significant deletions or additions are made to the Scope of Work.

TERMS AND CONDITIONS/APPROVAL
This work will be governed in accordance with our current contract agreement with the City. Please indicate your approval by signing below. Approval indicates your acceptance of the scope of work and pricing. Any modifications to the attached language must be accepted by both parties.

We appreciate the opportunity to present this proposal for your review. If you have any questions or comments, please contact Sami Ayass at (951) 836-0025 or [email protected] or Virginia Becerra at (909) 655-3284 or [email protected]. We look forward to continuing working with you. Thank you for your continued consideration and use of our services. We look forward to providing the City with these services should you find this proposal acceptable Sincerely
TETRA T§CH BAS, INC.
abM
Sami Fnyass, P.E.

Director, Engineering and Field Services
Methane Gas Group
Paul Stout. P
Vice President of Operations
Methane Gas Group
City of Downey