Item No.

TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

FROM: OFFICE OF THE CITY MANAGER
BY: MATTHEW BAUMGARDNER, DIRECTOR OF PUBLIC WORKS/CITY

ENGINEER

DATE: MARCH 11, 2025

SUBJECT: APPROVAL OF CONSTRUCTION CONTRACT FOR CITYWIDE SEWER IMPROVEMENTS, CAPITAL IMPROVEMENT PROJECT (CIP) NO. 24-24

EXECUTIVE SUMMARY

The City Council will consider awarding a contract to Torres Sanitation Systems Construction in the amount of $649,325 for the construction of Citywide Sewer Improvements, CIP No. 24-

24. The proposed sewer improvements, which would occur on various streets throughout the northwest, northeast, and southwest quadrants of the City, are necessary to ensure reliable sanitary sewer service in these areas and include replacement of damaged sections of sewer main and installation of additional sewer manholes for maintenance accessibility.

RECOMMENDATION

That the City Council:

1. Award a contract to Torres Sanitation Systems Construction in the amount of $649,325 for the construction of Citywide Sewer Improvements, CIP No. 24-24; and

2. Authorize the City Manager, or his designee, to execute any change orders or additional scope of work for this project deemed necessary or desirable up to the approved project budget of $1,400,000.

BACKGROUND

As part of the City’s annual sanitary sewer maintenance program, a number of the City’s sewer mains are analyzed via sewer flushing and video assessments, which identifies areas in need of repair to ensure continued efficiencies of the sanitary sewer collection system.

Sewer mains along various streets throughout the northwest, northeast, and southwest quadrants of the City need repair and rehabilitation to ensure that the City is able to continue to use this infrastructure to provide reliable sewer service to the community. The project limits are shown on the project location map included as Attachment A.

ANALYSIS

On January 14, 2025, the City Council approved plans and specifications and granted authority to advertise the subject project for bids (Attachment B). A copy of the project

APPROVAL OF CONSTRUCTION CONTRACT FOR CITYWIDE SEWER IMPROVEMENTS, CAPITAL IMPROVEMENT PROJECT (CIP) NO. 24-24
MARCH 11, 2025
PAGE 2

specifications is available for review in the Public Works Department. The proposed sanitary sewer improvements include: the removal and replacement of short damaged sections of sewer main at 42 spot locations throughout the City; installation of additional sewer manholes to enhance sewer main accessibility in hard to reach areas; and replacement of longer sections of old deteriorated cast iron and vitrified clay pipe with new vitrified clay pipe at 5 locations within the project limits to help improve sanitary sewer collection efficiency in these areas.

The project was posted on Planet Bids on January 23, 2025, advertised in the Downey Patriot on January 23 and 30, 2025, and published in various trade publications. On February 12, 2025, the City received eleven bids electronically through Planet Bids ranging from $649,325 to $1,547,050. The bid results were as follows:

CONTRACTOR LOCATION BID AMOUNT
Torres Sanitation Systems Construction South Gate $649,325 Ramona, Inc. Baldwin Park $733,435
Williams Pipeline Contractors, Inc. Mission Hills $740,575 GRBCON, Inc. Baldwin Park $756,058
Gentry General Engineering, Inc. Rancho Cucamonga $852,585 Diamond Construction and Design San Clemente $990,540
Dominguez General Engineering, Inc. Pomona $1,143,625
GCI Construction, Inc. San Clemente $1,285,900
Big Ben Engineering Irvine $1,309,180
MMC, Inc. La Palma $1,376,200
CEM Construction Corp. Montebello $1,547,050

The lowest responsive and responsible bidder is Torres Sanitation Systems Construction in the amount of $649,325 (Attachment C). Staff reviewed the bid proposal and references provided by Torres Sanitation Systems Construction and found that Torres Sanitation Systems Construction has satisfactorily completed projects for the Cities of Alhambra, Lynwood, Long Beach, Riverside, and others. Torres Sanitation Systems Construction’s state contractor’s license is “current and active,” and this contractor is registered with the California Department of Industrial Relations (DIR) for Labor Compliance. Staff recommends that the City Council award a contract to Torres Sanitation Systems Construction for the construction of the Citywide Sewer Improvements, CIP No. 24-24.

Construction is anticipated to begin in March 2025 and be completed in August 2025.

This project is categorically exempt from the provisions of CEQA under Section 15302 Class 2(c)

CITY COUNCIL PRIORITIES

Quality of Life, Safety and Infrastructure

APPROVAL OF CONSTRUCTION CONTRACT FOR CITYWIDE SEWER IMPROVEMENTS, CAPITAL IMPROVEMENT PROJECT (CIP) NO. 24-24
MARCH 11, 2025
PAGE 3

FISCAL IMPACT

Approval of the recommended actions will result in an expenditure of approximately $930,000, (breakdown listed below) from Water Fund Capital Improvement Program (CIP) Account No. 72-1-3999 as provided in the table below.

Description Amount
Design $71,000
Construction Contract $649,325
Contingencies (10%) $64,933
City-Furnished Materials $7,500
Materials Testing and Contract Administration $137,242
Total Estimated Project Cost: $930,000

There is sufficient fund balance for the recommended actions.

Account No. Funding Source Amount
72-1-3999
FY 2024-25 Sewer Main Rehabilitation and
Repair Program CIP $1,400,000
Total Project Funding: $1,400,000

ATTACHMENTS

Attachment A: Project Location Map
Attachment B: Plans
Attachment C: Bid Summary

APPROVAL OF CONSTRUCTION CONTRACT FOR CITYWIDE SEWER IMPROVEMENTS, CAPITAL IMPROVEMENT PROJECT (CIP) NO. 24-24
MARCH 11, 2025
PAGE 4

ATTACHMENT A

1056055191942VICINITY MAP

NOT TO SCALE
PROJECT AREA 1
PROJECT AREA 3
PROJECT AREA 4
PROJECT AREA 2
SEWER CONSTRUCTION NOTES:

ISOLATE, REMOVE, AND REPLACE BROKEN PIPE WITH NEW 8" EXTRA STRENGTH VCP SEWER MAIN AND REPAIR COUPLINGS PER DETAIL 4 ON SHEET 12. 1 ISOLATE, REMOVE, AND REPLACE BROKEN PIPE WITH NEW 10" EXTRA STRENGTH VCP SEWER MAIN AND REPAIR COUPLINGS PER DETAIL 4 ON SHEET 12. 2 INSTALL NEW 48" OLDCASTLE PRECAST SEWER MANHOLE WITH
POLYPROPYLENE STEPS, LANE MODEL P-14938 PER DETAIL 1 ON SHEET 13. 3 REMOVE AND REPLACE INTERFERING PORTION OF EXISTING SEWER MAIN WITH NEW 8" EXTRA STRENGTH VCP SEWER MAIN IN SAME ALIGNMENT AND CONNECT TO EXISTING SEWER MAIN PER DETAIL 4 ON SHEET 13. 4 REMOVE AND REPLACE LATERAL CONNECTION WITH NEW 8" X 6" EXTRA STRENGTH VCP WYE AND REPAIR COUPLINGS.
5 CUT AND REMOVE INTERFERING PORTION OF STEEL CASING AND INSTALL RUBBER CASING END SEAL ON CASING TO REMAIN IN PLACE.
6 INSTALL 1-SACK CEMENT SLURRY BACKFILL (100-E-100).7

REMOVE EXISTING CLEANOUT AND CONSTRUCT NEW CLEANOUT PER DETAIL 5 ON SHEET 13.
8 JOIN EXISTING MANHOLE PER DETAIL 3 ON SHEET 12.9
REMOVE INTERFERING PORTION OF PCC ENCASEMENT.10

TITLE SHEET

RGROUND STRUCTURESUNDE

CONSTRUCTION PLANS FOR
HE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLECAUTION: T ABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS.FOR, OR LI

GES TO THE PLANS MUST BE IN WRITING AND MUST BE APPROVED BYALL CHAN RER OF THESE PLANS.THE PREPA

ALL UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER OR

D THOSE SHOWN ON THE RECORDS EXAMINED ARE INDICATED WITHOTHERS AN ROXIMATE LOCATION AND EXTENT. THE OWNER BY ACCEPTING THESETHEIR APP

PROCEEDING WITH IMPROVEMENTS PURSUANT THERETO AGREES TOPLANS OR

ABILITY AND TO HOLD UNDERSIGNED HARMLESS FOR ANY DAMAGESASSUME LI

FROM THE EXISTENCE OF UNDERGROUND UTILITIES OR STRUCTURESRESULTING

TED TO THE UNDERSIGNED, NOT INDICATED ON THE PUBLIC RECORDSNOT REPOR

LOCATED AT VARIANCE WITH THAT REPORTED OR SHOWN ON RECORDSEXAMINED, THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARYEXAMINED.

TO PROTECT THE UTILITIES OR STRUCTURES SHOWN AND ANY OTHERMEASURES R STRUCTURES FOUND AT THE SITE. IT SHALL BE THE CONTRACTOR'SUTILITIES O

BILITY TO NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURESRESPONSI D BEFORE STARTING WORK. CONSTRUCTION CONTRACTOR AGREESCONCERNE

CORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES,THAT IN AC

TION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE ANDCONSTRUC

RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSECOMPLETE

RUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS ANDOF CONST , THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLYPROPERTY

E LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTIONAND NOT B

OR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGNCONTRACT

NAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, INPROFESSIO

ON WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTCONNECTI RISING FROM THE SOLE NEGLIGENCE OF THE DESIGN PROFESSIONAL.LIABILITY A

INDEX TO PROJECT DRAWINGS
SHEET NO.DESCRIPTION

TITLE SHEET

SEWER SYSTEM GENERAL NOTES AND MATERIAL SPECIFICATIONS
KEYMAP
SEWER SPOT REPAIR PLAN - PROJECT AREA 1 LOCATIONS 1-5
SEWER SPOT REPAIR PLAN - PROJECT AREA 1 LOCATIONS 6-7 AND PROJECT AREA 2 LOCATIONS 8-10 SEWER SPOT REPAIR PLAN - PROJECT AREA 3 LOCATIONS 11-15 SEWER SPOT REPAIR PLAN - PROJECT AREA 3 LOCATIONS 16-20 SEWER SPOT REPAIR PLAN - PROJECT AREA 3 LOCATIONS 21-25

SEWER IMPROVEMENT PLAN AND PROFILE - INSTALLATION OF NEW MANHOLES

SEWER IMPROVEMENT PLAN AND PROFILE

SEWER IMPROVEMENT PLAN AND PROFILE

SEWER CONNECTION DETAILS

MISCELLANEOUS DETAILS
1 2
3 4
5 6
7 8
9 10
11 12
13 BASIS OF BEARINGS

BENCHMARK

CITY OF DOWNEY

PUBLIC WORKS DEPARTMENT
FIELD SURVEY DATE 9-5-23 TO 9-6-23
MAP COMPILED BY:

METZ SURVEYING
28422 CONSTELLATION RD, SUITE 118
SANTA CLARITA, CA 91355
(661) 388-2003

TOPOGRAPHIC SURVEY
SUVA ST (PARROT TO ORIZABA) / GALLATIN RD AND LEMORAN AVE / DALEWOOD AVE AND ALIWIN ST:

LOS ANGELES COUNTY BM EY1390
L&T IN CB @ BCR @ SE COR PARAMOUNT BL & SUVA ST 48FT S/O & 38FT E/O C/L INT MKD (BM) ELEV = 134.024

THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA COORDINATE SYSTEM, ZONE 5, NAD 83 EPOCH 2017.50 AS DERIVED

FROM GEODETIC VALUES PUBLISHED BY THE CALIFORNIA SPATIAL REFERENCE CENTER.

NOTES TO CONTRACTOR

1. CONTRACTOR SHALL FIELD VERIFY THE SIZE, MATERIAL, HORIZONTAL, AND

VERTICAL LOCATION OF ALL CONNECTION POINTS AND ALL UTILITY CROSSINGS PRIOR TO ANY CONSTRUCTION ACTIVITY.

2. CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE DRIVEWAYS, DRIVEWAYS AND STREET INTERSECTIONS AT ALL TIMES.

3. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT IN PLACE EXISTING UTILITIES AND THRUST BLOCKS.

4. ANY SEWER LATERAL THAT IS DAMAGED WITHIN THE SPOT REPAIR LOCATION IS TO BE REPLACED PER DETAIL 6 ON SHEET 12.

5. FOR INSTALLATIONS IMPACTING THE EXISTING CURB AND GUTTER,

CONTRACTOR SHALL REMOVE AND REPLACE TO THE NEAREST WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 1.

6. FOR INSTALLATIONS IMPACTING THE EXISTING CONCRETE SIDEWALK,

CONTRACTOR SHALL REMOVE AND REPLACE TO THE NEAREST WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 5.

7. THE EXISTING PCC PORTION OF THE ROAD (LOCATED AT SPOT REPAIR 20 AND SPOT REPAIR 21) IS AN AVERAGE OF 8" THK REINFORCED CONCRETE. THE

CONTRACTOR WILL BE REQUIRED TO SAW CUT AND FORM NEAT CLEAN CUTS AND WILL BE REQUIRED TO REPLACE THE PCC. TRENCH SHALL BE REPLACED PER DWG. NO. 5-S ON SHEET 13.

8. IF THE EXISTING V-GUTTER IS DAMAGED DURING CONSTRUCTION, THE CONTRACTOR SHALL REPLACE IN KIND.

9. FOR INSTALLATIONS IMPACTING THE EXISTING CONCRETE ALLEY INTERSECTION,

CONTRACTOR SHALL REMOVE AND REPLACE TO THE NEAREST WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 15.

10. IF THE EXISTING WATER METER BOX, METER, AND WATER SERVICE IS DAMAGED DURING CONSTRUCTION, THE CONTRACTOR SHALL REPLACE IN KIND.

11. FOR INSTALLATIONS IMPACTING THE EXISTING CONCRETE CROSS GUTTER,

CONTRACTOR SHALL REMOVE AND REPLACE TO THE NEAREST WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 2.

DATUM STATEMENT

THE COORDINATES SHOWN ON THIS SURVEY ARE BASED ON THE
CALIFORNIA COORDINATE SYSTEM, ZONE 5, NAD 83, EPOCH 2017.50.

THORIZED CHANGES & USESUNAU
PLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24

UTILITY AND AGENCY INDEX
CITY OF DOWNEY WATER & SEWER 562-904-7202
CITY OF DOWNEY TRAFFIC ENGINEER 562-904-7110
COUNTY SANITATION DISTRICT OF LOS ANGELES TOMMY SUNG 562-699-7411 X 1205 LA COUNTY DEPARTMENT OF PUBLIC HEALTH (DPH) DAN BACANI 626-430-5290 STATE WATER RESOURCES CONTROL BOARD MATT MEGILL 818-551-2033 FRONTIER COMMUNICATION (VERIZON) RAYMOND ROUNDTREE 562-903-7939 LA COUNTY DEPARTMENT OF PUBLIC WORKS MICHAEL TJAN 626-458-1700 LA COUNTY DEPARTMENT OF PUBLIC WORKS MANUEL ALARCON 626-458-7169 LA COUNTY FLOOD CONTROL DISTRICT MARYAM ADHAMI 626-458-3129 METROPOLITAN TRANSPORTATION AUTHORITY MATTIE JONES 213-922-5023 SOUTHERN CALIFORNIA EDISON SAUL VALLE 562-903-3176
CENTRAL BASIN MUNICIPAL WATER DISTRICT ISABELLE GUIDO 323-201-5541 SOUTHERN CALIFORNIA GAS COMPANY ERNIE GONZALEZ 714-634-3121 SPECTRUM (TIME WARNER CABLE) ERNEST CHANG 562-259-2015
PARAMOUNT PIPELINES STEVE PEYTON 562-531-2060 X 2751
SBC MARCELLA CORDOZA 310-515-4370
EXXON / MOBIL MELODY SEBRING 310-212-4141
METROPOLITAN WATER DISTRICT KEN CHUNG 213-217-7670
BP (ARCO) PIPELINES ROB STREED 562-499-2216
LEVEL 3 / WILTEL COMMUNICATIONS ROGER WEATHERS 720-888-5688 ABOVENET COMMUNICATIONS KEVIN SULLIVAN 714-236-8502
MCI WORLDCOM DON BECKERMANN 626-666-3526
QWEST COMMUNICATIONS PATT SLANEY 714-936-4898
SPRINT JOE HEALEY 714-781-7048
CROWN CASTLE (NEXTG NETWORKS) RON HERRERA 909-593-9700
CHARTER COMMUNICATIONS STEVE FEAR 626-430-3338
AT&T AREA REPRESENTATIVE 510-645-2929
CALIFORNIA WATER SERVICE PHILLIP DELGADO 323-263-4145
CRIMSON PIPELINE LP AREA REPRESENTATIVE 866-351-7473
GREEN LINE PAT LUBASH 562-810-3206
LT PIPELINE INC. RAY COUILLARD 562-928-7000
MARATHON PIPE LINE AREA REPRESENTATIVE 800-435-1371
MOBILITIE SCOTT HOLT 877-244-7889
TORRANCE LOGISTICS CO. DINO ALVARADO 310-212-1842
ZAYO AREA REPRESENTATIVE 801-364-1063
UNDERGROUND SERVICE ALERT (USA) ---- 8-1-1

STREET CENTERLINE

EXISTING R/W

SYMBOL/LEGEND

EXISTING WATER MAIN AND SERVICE

EXISTING GAS LINE

EXISTING SANITARY SEWER
W
G
SS

EXISTING STORM DRAINSD

UE EXISTING UNDERGROUND ELECTRICAL LINE
UT
RW

EXISTING UNDERGROUND TELEPHONE LINE

FIRE HYDRANT

METER BOX

EXISTING RECYCLED WATER LINE
VALVE

REDUCER
DCDA
CAP
EB

LIGHT POLE

POWER POLE

MANHOLE

ELECTRIC UTILITY BOXW (ABAN)EXISTING ABANDONED WATER MAIN

SS(ABAN)EXISTING ABANDONED SEWER LINE

OE EXISTING OVERHEAD ELECTRICAL LINE

O EXISTING UNDERGROUND OIL LINE

FLOW ARROW
ALLEY (DE PALMA ST - STEWART AND GRAY RD) / MYRTLE ST (FIRESTONE BLVD TO ALLEY):

LOS ANGELES COUNTY BM EY3173
L&BR IN S CB 1 FT W/O BCR @ SW COR PARAMOUNT BLVD & DE PALMA ST ELEV = 112.382
IMPERIAL HWY SIDE STREET AND BROOKSHIRE AVE:

LOS ANGELES COUNTY BM EY11448
LACO BM TAG @ CUL-DE-SAC OF SERVICE RD @ SE COR IMPERIAL HWY & BROOKSHIRE AVE 75.5FT S/O & 82FT E/O C/L INT @ HSE #8504
ELEV = 100.043

ABBREVIATIONS

AGGREGATE BASE

ASPHALT CEMENT

AMERICAN NATIONAL STANDARDS INSTITUTE

AMERICAN SOCIETY FOR TESTING AND MATERIALS
AVENUE

BOULEVARD

CLOSED-CIRCUIT TELEVISION

CAST IRON PIPE

CURED-IN-PLACE PIPE

CENTERLINE

DIAMETER

DOUBLE CHECK DETECTOR ASSEMBLY
DRIVE

DOWNSTREAM
DETAIL

DRAWING

EAST OF

EXISTING
GAS

HIGHWAY
INVERT

JOINT PHOTOGRAPHIC EXPERTS GROUP

LOS ANGELES

LINEAL FEET

MAXIMUM

MANHOLE

MINIMUM

MOVING PICTURE EXPERTS GROUP

NORTH OF
NUMBER

NOT TO SCALE
OIL

OUTER DIAMETER

OVERHEAD ELECTRICAL
AB
AC
ANSI
ASTM
AVE
BLVD
CCTV
CIP
CIPP
CL
D
DCDA
DR
DS
DTL
DWG
E/O
EX.

G
HWY
INV
JPEG
LA
LF
MAX
MH
MIN
MPEG
N/O
NO.

NTS
O
OD
OE

PORTLAND CEMENT CONCRETE
PLACE

POUNDS PER SQUARE INCH

POLYVINYL CHLORIDE
RADIUS

RIGHT-OF-WAY
ROAD

RECYCLED WATER

SOUTH OF

STORM DRAIN

STANDARD DIMENSION RATIO
SHEET

SANITARY SEWER

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION
STREET

STATION

STATE WATER RESOURCES CONTROL BOARD
THICK

TYPICAL

UNDERGROUND ELECTRICAL

UPSTREAM

UNDERGROUND TELEPHONE

VITRIFIED CLAY PIPE
WATER
PCC
PL
PSI
PVC
R
R/W
RD
RW
S/O
SD
SDR
SHT
SS
SSPWC
ST
STA
SWRCB
THK
TYP
UE
US
UT
VCP

WATTACHMENT B

SEWER SYSTEM GENERAL NOTES AND

1. LOCATION OF EXISTING UTILITIES/UNDERGROUND FACILITIES KNOWN TO ENGINEER ARE SHOWN IN

THEIR APPROXIMATE LOCATIONS BASED ON BEST AVAILABLE INFORMATION AT TIME OF PREPARING PLANS. ACTUAL LOCATION, SIZE, TYPE, AND NUMBER OF UTILITIES/UNDERGROUND FACILITIES MAY DIFFER FROM THAT SHOWN AND SUCH UTILITIES/FACILITIES MAY BE PRESENT THAT ARE NOT SHOWN.

IT IS THE CONTRACTOR'S RESPONSIBILITY TO HAVE SITE INSPECTED THROUGH USA PRIOR TO

COMMENCING WORK AND TO VERIFY LOCATIONS OF ALL UTILITIES WITH RESPECTIVE OWNERS PRIOR TO STARTING WORK AND THROUGHOUT CONTRACT.

2. POTHOLE/HAND DIG AT UTILITY CROSSINGS/OBSTRUCTIONS, AND AREAS WHERE LOCATIONS OF UTILITIES AND UNDERGROUND FACILITIES ARE IN QUESTION PRIOR TO STARTING WORK. ANY CHANGES TO PROPOSED SEWER IMPROVEMENTS MUST BE APPROVED BY CITY.

3. COORDINATE WITH OWNER OF ANY UTILITY OR OBSTRUCTION PRIOR TO RELOCATING/ADJUSTING ANY SUCH ITEMS.

4. POTHOLE POINTS OF CONNECTION WITH EXISTING MAINS, LATERALS, AND MANHOLES TO DETERMINE EXISTING ELEVATIONS AND VERIFY MEANS OF CONNECTING PRIOR TO STARTING WORK.

5. WORK LIMITED TO THOSE HOURS AS STATED IN THE ENCROACHMENT PERMIT AND SPECIFICATIONS.

6. CONTACT KENNY SOTO, SEWER AND STORMWATER SUPERVISOR, AT (562) 904 - 7202 (OFFICE) OR (562) 445 - 5873 (CELL) MINIMIUM 72 HOURS PRIOR TO STARTING WORK TO SCHEDULE INSPECTION.

7. CHANGE IN PLAN AND/OR PROFILE OF SEWER IMPROVEMENTS SHALL BE APPROVED BY CITY.

8. CONTRACTOR SHALL MAINTAIN SEWER SERVICE TO CUSTOMERS AT ALL TIMES INCLUDING

INSTALLATION OF ADEQUATE PIPE PLUGS IN COORDINATION WITH CITY SEWER CREW TO PROVIDE STANDBY VACTOR TRUCK SERVICE AS DEEMED NECESSARY BY CITY.

9. CONTRACTOR SHALL RESTORE, AT ITS COST, ANY ITEMS OUTSIDE THE LIMITS OF WORK WHICH ARE

DAMAGED AS THE RESULT OF CONTRACTOR OPERATIONS, OR THOSE ITEMS DAMAGED WITHIN THE LIMITS OF WORK WHICH WERE TO REMAIN IN PLACE. ANY ITEMS REQUIRED TO REMAIN IN PLACE,

SHALL BE RESTORED TO THEIR ORIGINAL CONDITION AND LOCATION THAT EXISTED PRIOR TO CONSTRUCTION.

10. LENGTH OF OPEN TRENCH AND SIZE OF EXCAVATIONS LIMITED TO AMOUNT OF PIPE AND FACILITIES TO BE INSTALLED IN ONE DAY. PROTECT TRENCH AND EXCAVATIONS FROM PEDESTRIAN/VEHICULAR

TRAFFIC PER CITY REQUIREMENTS INCLUDING BARRIERS, BACKFILL, COMPACTION, TEMPORARY PAVEMENT, AND STEEL PLATES. NO OPEN TRENCH OR EXCAVATION AREAS SHALL REMAIN OVERNIGHT.

11. PROTECT WORK AREA FROM PEDESTRIAN/VEHICULAR TRAFFIC PER CITY REQUIREMENTS INCLUDING BARRIERS, SIGNS, ETC.

12. NO STORAGE OF MATERIALS/EQUIPMENT WILL BE ALLOWED ON PRIVATE PROPERTY OR IN PUBLIC RIGHT-OF-WAY. PROVIDE OFFSITE/ONSITE STAGING/STORAGE AREA.

13. THE DISCHARGE OF POLLUTANTS TO ANY STORM DRAINAGE SYSTEM IS PROHIBITED. NO SOLID

WASTE, PETROLEUM BY-PRODUCTS, SOIL PARTICULATE, CONSTRUCTION WASTE MATERIALS, OR

WASTEWATER GENERATED ON CONSTRUCTION SITES OF BY CONSTRUCTION ACTIVITIES SHALL BE PLACED, CONVEYED, OR DISCHARGED INTO THE STREET, GUTTER, OR STORM DRAIN SYSTEM.

14. TRAFFIC CONTROL PER CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD), LATEST EDITION, AND AS REQUIRED BY THE TRAFFIC ENGINEER.

15. PIPE BASE AND PIPE ZONE BACKFILL - 1/2" CRUSHED ROCK FOR VCP @ MINIMUM 90% RELATIVE COMPACTION. CERTIFICATE OF IMPORTED MATERIAL REQUIRED. SEE PLANS FOR AREAS THAT REQUIRE A 1-SACK CEMENT SLURRY (100-E-100) BACKFILL.

16. TRENCH ZONE BACKFILL - IMPORTED SAND OR NATIVE MATERIAL WITH MINIMUM SAE OF 30 OR COEFFICIENT OF PERMEABILITY GREATER THAN 1.4 INCHES PER HOUR @ MINIMUM 90% RELATIVE COMPACTION. CERTIFICATE OF IMPORTED OR NATIVE MATERIAL REQUIRED. SEE PLANS FOR AREAS THAT REQUIRE A 1-SACK CEMENT SLURRY (100-E-100) BACKFILL.

17. PAVEMENT ZONE - FOR AREAS CURRENTLY PAVED, AC/PCC PAVEMENT AND AGGREGATE BASE SHALL

BE REPLACED TO EXISTING THICKNESS PLUS ONE INCH UNLESS OTHERWISE CALLED OUT IN THE PLANS AND SPECIFICATIONS. MINIMUM 95% RELATIVE COMPACTION.

18. COMPACTION TESTING PAID FOR AND COORDINATED BY CITY PER CITY REQUIREMENTS. COMPACTION TESTS AT RANDOM DEPTHS AND INTERVALS AS DIRECTED BY THE CITY.

19. GRAVITY SANITARY SEWER PIPE AND ASSOCIATED FACILITIES (I.E. MANHOLES, ETC.) SHALL PASS ALL

APPLICABLE LEAKAGE/HYDROSTATIC AND DEFLECTION TESTS INCLUDING LEAKAGE AND

HYDROSTATIC TESTING IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (SSPWC). LATEST EDITION AND NCPI AIR TEST TABLES, ANSI/ASTM C828 STANDARD TEST METHODS FOR LOW PRESSURE AIR TEST OF VCP LINES. LOW PRESSURE AIR TEST OF VCP AT 4 PSI. HYDROSTATIC PRESSURE TEST OF PVC AT 200 PSI FOR 4 HOURS. COMPLETELY BACKFILL AND COMPACT PRIOR TO CONDUCTING TESTS.

20. PROVIDE TEMPORARY OR PERMANENT MATERIALS/EQUIPMENT NECESSARY TO PERFORM ALL TESTING (I.E. TEST PLUGS, PUMP/MOTOR, COMPRESSOR, HOSING, PRESSURE GAGES, AIR

RELEASE/VACUUM VALVES FOR REMOVING/ADDING AIR/WATER DURING FILLING/FLUSHING OF PIPELINES, ETC.).

21. ALL EXCAVATION SHALL CONFORM TO STATE OF CALIFORNIA CONSTRUCTION SAFETY ORDERS.

CONTRACTOR SHALL SUBMIT SHEETING SHORING/BRACING DESIGN DUE TO THE DEPTH OF EXCAVATIONS ANTICIPATED. DESIGN OF SHEETING, SHORING/BRACING FOR TRENCH/EXCAVATION

AND TESTING OF HAZARDOUS ATMOSPHERES, SHALL BE PER CAL OSHA STANDARDS WHICH MAY OR MAY NOT REQUIRE STAMP/SIGNATURE OF A CALIFORNIA REGISTERED PROFESSIONAL ENGINEER (P.E.) DEPENDING UPON METHOD CHOSEN (SEE CALIFORNIA CODE OF REGULATIONS, TITLE 8, SECTIONS 341, AND 1540-1541 AND OTHER AS NECESSARY).

22. WHENEVER IT BECOMES NECESSARY TO TUNNEL UNDER EXISTING IMPROVEMENTS, THE CONTRACTOR SHALL SUPPORT THOSE IMPROVEMENTS IN A MANNER APPROVED BY THE CITY.

CONTRACTOR SHALL SUBMIT PLANS FOR SUPPORT OF EXISTING UTILITY LINES DURING TRENCH EXCAVATION FOR CITY APPROVAL.

23. APPROVAL OF THESE PLANS BY THE CITY OF DOWNEY DOES NOT CONSTITUTE A REPRESENTATION AS

TO THE ACCURACY OF THE LOCATION OF OR THE EXISTENCE OR NON-EXISTENCE OF ANY UNDERGROUND UTILITY PIPE OR STRUCTURE WITHIN THE LIMITS OF THIS PROJECT.

24. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ANY STREET MONUMENTATION IN PLACE. IF ANY MONUMENT IS DISTURBED OR DESTROYED, THE CONTRACTOR WILL BE REQUIRED TO

CONTRACT WITH A REGISTERED LAND SURVEYOR FOR THE RE-ESTABLISHMENT AND MAPPING OF THE DESTROYED MONUMENT.

25. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO APPLY FOR ANY NECESSARY ENCROACHMENT,

BUSINESS LICENSE, STORM WATER POLLUTION PREVENTION, OR OTHER PERMIT FROM THE GOVERNING AGENCY.

26. MAINTAIN HORIZONTAL (MINIMUM 10') AND VERTICAL SEPARATION (MINIMUM 1-FOOT BELOW) FROM POTABLE WATER LINES PER SWRCB STANDARDS UNLESS OTHERWISE SHOWN.

GENERAL NOTES - SEWER

1. SUBMIT CERTIFICATION OF PIPING AND ALL PROJECT MATERIALS FOR COMPLIANCE WITH CITY STANDARDS.

ALL PIPING AND ASSOCIATED MATERIALS MUST BE IN HAND PRIOR TO START OF CONSTRUCTION.

2. MAXIMUM JOINT DEFLECTION OF PIPE NOT TO EXCEED 75% OF MANUFACTURER'S RECOMMENDATIONS.

3. ALL GRAVITY SEWER LINES CONSTRUCTED TO PUBLIC WORKS STANDARDS SHALL BE VITRIFIED CLAY PIPE (VCP) AS SHOWN ON THE PLANS.

4. ALL VCP JOINTS SHALL BE OF THE COMPRESSION TYPE PER ASTM C425.

5. VCP SHALL BE "EXTRA STRENGTH" BY GLADDING MCBEAN, MISSION CLAY PRODUCTS, BUILDING PRODUCTS COMPANY, OR CITY APPROVED EQUAL PER ASTM C700. VCP SHALL BE "PLAIN END" AND FITTED WITH MANUFACTURER INSTALLED TYPE 2 BAND SEAL AND/OR TYPE Z REPAIR COUPLING. REPAIR CLAMPS SHALL BE TYPE 316 STAINLESS STEEL.

6. UNLESS OTHERWISE CALLED OUT ON PLANS ALL HOUSE CONNECTIONS SHALL BE MINIMUM 6-INCH DIAMETER VCP.

MATERIAL SPECIFICATIONS - SEWER
PLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24 MATERIAL SPECIFICATIONS

LOCATION 1
BOTANY STREET - SEE SHEET 4
LOCATION 2
DANVERS STREET - SEE SHEET 4
LOCATION 3
BAIRNSDALE STREET - SEE SHEET 4
LOCATION 4
PARAMOUNT BLVD - SEE SHEET 4

PLAN AND PROFILE (SUVA ST EAST)
SEE SHEET 9

PLAN AND PROFILE (SUVA ST WEST)
SEE SHEET 9
LOCATION 6
GUATEMALA AVENUE - SEE SHEET 5
LOCATION 5
SUVA STREET - SEE SHEET 4

SUVA STRIO HONDO RIVERPARAMOUNT BLVDPARAMOUNT BLVDGUATEMALA AVESMALLWOOD AVEGAL L
A
T
I
N

R
D

LUBEC ST DOWNEY AVEDOWNEY AVETWEEDY LNTWEEDY LNSUVA ST
I-5 FREE
W
A
Y

HORLEY AVEALLENGROVE ST

PARROT AVEORIZABA AVEBROCK AVEGAINFORD ST

FINEVALE DR KRISTIN DRCALMCREST DR
SCOUT AVELOCATION 10
FLORENCE AVENUE - SEE SHEET 5
LOCATION 12
IRWINGROVE DRIVE - SEE SHEET 6
LOCATION 13
RIO HONDO DRIVE - SEE SHEET 6
LOCATION 14
RIO HONDO PLACE - SEE SHEET 6
LOCATION 15
FOSTORIA STREET - SEE SHEET 6
LOCATION 16
3RD STREET - SEE SHEET 7
LOCATION 17
2ND STREET - SEE SHEET 7
LOCATION 18
3RD STREET - SEE SHEET 7
LOCATION 19
ALLEY - SEE SHEET 7
LOCATION 20
ALLEY - SEE SHEET 7
LOCATION 21
4TH STREET - SEE SHEET 8
LOCATION 24
NEW STREET SEE SHEET 8
LOCATION 23
2ND STREET - SEE SHEET 8

PLAN AND PROFILE (MYRTLE ST)
SEE SHEET 11RIO HONDO RIVERPARAMOUNT BLVDOLD RIVER SCHOOL RDFOSTORIA ST 4TH PL
5TH ST
4TH ST
3RD ST
2ND ST

RIO HONDO DRPELLET ST
FIRESTONE BLVDWILEY BURKE AVE4TH ST

FLORENCE AVE

IRWINGROVE DR
RIVES AVE3RD ST
7TH ST
DOWNEY AVE4TH PLSMALLWOOD AVERIVES AVE2ND ST
LOCATION 22
MYRTLE STREET - SEE SHEET 8SHERRY AVESUSAN AVEVIA AMORITA

POMERING AVEJULIUS AVENORLAIN AVEDINWIDDIE ST
LOCATION 7
CHANEY AVENUE - SEE SHEET 5

PLAN AND PROFILE (GALLATIN RD)
SEE SHEET 10
LOCATION 9
DALEWOOD AVENUE - SEE SHEET 5

PLAN AND PROFILE (DALEWOOD AVE)
SEE SHEET 11
LOCATION 8
PICO VISTA ROAD - SEE SHEET 5

GALLATIN R
D

LUBEC ST

APPLEBY ST LEMORAN AVEVISTA D
E
L

R
I
O

A
V
E

TELEGRAPH

R
D

PICO VISTA RDTRUE AVEMETRO STPASSONS BLVDCEDAR
T
R
E
E

R
D
I-5 FREE
W
A
Y I-605 FREEWAYCLANCEY AVEHALEDON AVECORD AVESIDEVIEW DRCEDARTREE

R
DCLARINDA AVELOCATION 25
CHEYENNE AVENUE - SEE SHEET 8

PLAN AND PROFILE (IMPERIAL HWY)
SEE SHEET 11

PLAN AND PROFILE (DE PALMA ALLEY)
SEE SHEET 10

BROOKSHIRE AVE

PARAMOUNT BLVD

IMPERIAL HWYSTEWART AND GRAY RDALAMEDA STBROOKSHIRE AVE

CHEYENNE ST

DOWNEY AVE

DOWNEY AVE

PARAMOUNT BLVD

BARLIN AVE ALAMEDA STPATTON RDBIRCHDALE AVE
I
-105

FREEWAYADOREE STDEVENIR AVEDOLAN AVE

EUCALYPTUS STORANGE STDE PALMA STPRUESS AVE

QUOIT STORANGE STORIZABA AVE
COLE STPLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24 KEYMAP
PROJECT AREA 1
SCALE: NTS
PROJECT AREA 2
SCALE: NTS
PROJECT AREA 3
SCALE: NTS
PROJECT AREA 4
SCALE: NTS
N N
N NLOCATION 11
IRWINGROVE DRIVE - SEE SHEET 6

7733 7739 7743 7749 7803 7809 7815 7821 7827
782678207814780878027748774277367730 8''SS8''SS8''SS4''W 4''W 4''W 4''W 4''W 4''W 4''W 4''W 4''G 4''G 4''G 4''G 4''G 4''G 4''G 4''G
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS
6''W6''W6''W2''G2''G2''GS
SS
S
S
S
SS
S
S
S
S
S
S
S
S
S

GG GG G G

GG GG GG
S

BOTANY STREET
0+00 1+00 2+00
DS MH N0541
STA. 2+51
US MH N0542
STA. 0+00
SPOT REPAIR NO. 2
STA. 0+47 (± 3 LF)
SPOT REPAIR NO. 1
STA. 0+00 (± 1 LF)60'30'30'18'18'EX. 8" VCP SEWER
ON CL
1 9 1 5
7707 7715 7721 7727 7733 7737 7743 7749
77467740773477307724771877127706770010''W10''W10''W2''G2''G2''G4''G4''G4''G8''SS8''SS8''SS8''SS 8''SS 8''SS 8''SS 8''SS 4''W 4''W 4''W 4''W 4''W 4''W 4''W
2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G
S
S
S
SS
SS
S
S
S
S
S
S
S
S
S

G G G G GG G G

G G G G G G G

DANVERS STREET
0+00 1+00 2+00 3+00
US MH N0558
STA. 0+00
DS MH N0557
STA. 3+04 54'27'27'15'15'SPOT REPAIR NO. 1
STA. 0+40 (±4 LF)
SPOT REPAIR NO. 2
STA. 1+63.5 (±3 LF)
SPOT REPAIR NO. 3
STA. 2+98 (±3 LF)
EX. 8" VCP SEWER
ON CL
1 1 1
7707 7715 7721 7727 7733 7739 7743 7749
77447740773477287722771677127706770010''W10''W10''W2''G2''G2''G4''G4''G4''G4''G8''SS8''SS8''SS8''SS4''W 4''W 4''W 4''W 4''W 4''W 4''W 8''SS 8''SS 8''SS 8''SS 8''SS
2''G 2''G 2''G 2''G 2''G 2''G 2''G
S
S
S
S
S
S
S
S
S
S
S
S
SS
S
GG
G
GGGG G

GGGGGGGG

BAIRNSDALE STREET
0+00 1+00 2+00 3+00
54'27'27'15'15'US MH N2081
STA. 0+00
DS MH N0463
STA. 3+00
SPOT REPAIR NO. 1
STA. 2+84.5 (±5 LF)
EX. 8" VCP SEWER
ON CL
1 8043 9048 9040 9034 9028 9022 9014 9008 9002 8903
9001 8999
12''SS8''W8''W8''W2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G
8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W
8''W
8''W

UT UT UT UT UT

UE UE UE UE UE
UE
UE
SD

UT UT UT UT

SD SD SD SD SD SD SD SD
6''W 6''W 6''W 6''W 6''W 6''W 6''W 6''W
6''W
6''W24''W 24''W 24''W 24''W 24''W 24''W 24''W
24''W
24''W
24''W16''WSD
10''SS 10''SS 10''SS 10''SS 10''SS
10''SS
10''SS
10''SS
G
GGG
G

PARAMOUNT BLVD
0+00
1+00
2+00
3+00
100'50'50'38'38'DS MH N0239
STA. 0+00
US MH N0240
STA. 3+14
SPOT REPAIR NO. 1
STA. 0+15 (±6 LF)
EX. 10" VCP SEWER
VARIES
2 7349
7359
7180
8''SS 8''SS 8''SS 8''SS 8''SS72''SD72''SD 72''SD 72''SD 30''G8''SS10''W10''W10''WG

SUVA STREET
0+00 1+00 2+00
60'30'30'20'20'DS MH N2155
STA. 0+00
US MH N2156
STA. 2+97
SPOT REPAIR NO. 1
STA. 2+61 (±40 LF)
EX. 8" VCP SEWER
ON CL
EX. SEWER CASING
61 AT SD
CROSSING 7
SEWER CONSTRUCTION NOTES:

ISOLATE, REMOVE, AND REPLACE BROKEN PIPE WITH NEW 8" EXTRA STRENGTH VCP SEWER MAIN AND REPAIR COUPLINGS PER DETAIL 4 ON SHEET 12. 1 ISOLATE, REMOVE, AND REPLACE BROKEN PIPE WITH NEW 10" EXTRA STRENGTH VCP SEWER MAIN AND REPAIR COUPLINGS PER DETAIL 4 ON SHEET 12. 2 REMOVE AND REPLACE LATERAL CONNECTION WITH NEW 8" X 6" EXTRA STRENGTH VCP WYE AND REPAIR COUPLINGS.
5 CUT AND REMOVE INTERFERING PORTION OF STEEL CASING AND INSTALL RUBBER CASING END SEAL ON CASING TO REMAIN IN PLACE.
6 JOIN EXISTING MANHOLE PER DETAIL 3 ON SHEET 12.9
INSTALL 1-SACK CEMENT SLURRY BACKFILL (100-E-100).7
PLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24

SEWER SPOT REPAIR PLAN
LOCATION 1

SITE CHARACTERISTICS
LOCATION 1 2 3 4 5

TYPE OF PAVEMENT/

GROUND SURFACE ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT
EXISTING PIPE 8" VCP 8" VCP 8" VCP 10" VCP 8" VCP & CIP APPROX. DEPTH TO TOP OF PIPE 7' 6.5'7.5'11'6'
PIPE ID P0585 P0253 P0003 P0646 P2163

DISTANCE FROM

MANHOLE
UPSTREAM 0' 47' 40' 163.5' 298' 284.5' 299' 36'
DOWNSTREAM 251' 204' 264' 140.5' 6' 15.5' 15' 261'

STREET BOTANY STREET DANVERS STREET BAIRNSDALE STREET PARAMOUNT BLVD SUVA STREET DAMAGE

CHANNEL
BROKEN
BROKEN
(4 TO 8 O'CLOCK)

MULTIPLE

FRACTURES
(5 TO 9 O'CLOCK)

MULTIPLE

FRACTURES
(8 TO 4 O'CLOCK)

MATERIAL CHANGEMSA / BROKEN /

INTRUDING

LATERAL
BROKEN
(6 TO 1 O'CLOCK)
BROKEN
(4 TO 8 O'CLOCK)
N
N
N
N
N
0 SCALE:
20' 40' 80'
1'' = 40'
LOCATION 2
LOCATION 3 LOCATION 4
LOCATION 5

SMALLWOOD AVENUE GUATEMALA AVENUE

GUATEMALA AVENUE GALLATIN ROAD

SCOUT AVENUE
1 1
2 2
1 2
1 1
2 2
3 3
1 2
3 1
1 1
1 1
1 NOTES TO CONTRACTOR:

1. CONTRACTOR SHALL FIELD VERIFY THE SIZE, MATERIAL,

HORIZONTAL, AND VERTICAL LOCATION OF ALL CONNECTION POINTS

AND ALL UTILITY CROSSINGS PRIOR TO ANY CONSTRUCTION
ACTIVITY.

2. CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE DRIVEWAYS, DRIVEWAYS AND STREET INTERSECTIONS AT ALL TIMES.

3. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES

NECESSARY TO PROTECT IN PLACE EXISTING UTILITIES AND THRUST BLOCKS.

4. ANY SEWER LATERAL THAT IS DAMAGED WITHIN THE SPOT REPAIR LOCATION IS TO BE REPLACED PER DETAIL 6 ON SHEET 12.

PROJECT AREA 1 LOCATIONS 1-5

912391299135 9117 9111 9107 9103
912291289134 9116 9110 9102
2''G 2''G 2''G
6''W6''W6''W8''SS 8''SS 8''SS 8''SS 8''SS
S
SS
SS
SS
SS
SS S

CHANEY AVENUE
0+00 1+00 2+00
DS MH N0337
STA. 0+00
US MH N0338
STA. 2+69
SPOT REPAIR NO. 1
STA. 1+63.5 (±6 LF)54'27'27'15'15'EX. 8" VCP SEWER
VARIES
1 9722 9116 ABC 9126 9136 9146 9156
9155914591359125911591059224
6''W 6''W 6''W
CATV
CATV

CATV CATV
CATV
CAT
V6''W4''W
4''W
8''SS
8''SS
SS
SS
SS
SS
SS6''W6''W2''G
2''G 2''G
2''G
2''G 2''G
2''G
UE

UEUE UE
UE
CATV8''SS 8''SS 8''SS
SDS

PICO VISTA ROAD
0+00
1+00 2+0020'10'DS MH N1189
STA. 0+00 US MH N1190
STA. 2+95
SPOT REPAIR NO. 1
STA. 1+86.5 (±6 LF)
EX. 8" VCP SEWER
5' S/CL 56'18'28'28'18'1
9361 9357 9351 9345 9339 9333
7505 7500
8''W 8''W 8''W 8''W 8''W 8''W 8''W
8''SS8''SS 8''SS 8''SS 8''SS8''SS
2''G4''W8''G8''G8''W30''SD30''SDS S S S S
SS
4''G 4''G 4''G 4''G 4''G
30''G30''G30''G8''W8''W8''W10''WGG G G GG

GUATAMELA AVENUE
0+00 1+00 2+00 3+00
EX. 8" VCP SEWER
12' N/CL
DS MH N2170
STA. 0+00
US MH N2123
STA. 3+45
SPOT REPAIR NO. 1
STA. 3+15 (±6 LF)
SPOT REPAIR NO. 2
STA. 2+98.5 (±4 LF)60'30'30'18'18'1 1
9722
931393159319
9308 9302 92649316 9260 9254
9259 9253
2''GUE
6''W 6''W
6''W
6''W
12''W 12''W
8''SS
S S S
S8''SS4''W4''W2''G
2''G
SSSS6''W8''SS 8''SS 8''SS
8''SS
CO 18''SDSSDALEWOOD AVENUE
0+00 1+00 2+00
EX. 8" VCP SEWER
27' E/CL60'30'18'30'18'EX. CONCRETE SIDEWALK
(SEE NOTE NO. 6)
US MH N1187
STA. 0+00
DS MH N1186
STA. 2+17
SPOT REPAIR NO. 2
STA. 0+95 (±4 LF)SPOT REPAIR NO. 1
STA. 0+58 (±4 LF)
EX. PCC ENCASEMENT
10 1 101
SEWER CONSTRUCTION NOTES:

ISOLATE, REMOVE, AND REPLACE BROKEN PIPE WITH NEW 8" EXTRA STRENGTH VCP SEWER MAIN AND REPAIR COUPLINGS PER DETAIL 4 ON SHEET 12. 1 REMOVE INTERFERING PORTION OF PCC ENCASEMENT.10
7224 7234 7238 7300 7336 7340
100397301
6''O 6''O 6''O 6''O 6''O 6''O 6''O 6''O

UT UT UT UT UTUTUTUTUTUT
4''O 4''O 4''O 4''O 4''O 4''O 4''O 4''O
2''G 2''G 2''G
2''G
2''G
3''G 3''G 3''G 3''G 3''G
96''SD
96''SD
96''SD
96''SD
96''SD 96''SD 96''SD 96''SD
6''W 6''W 6''W 6''W 6''W 6''W
6''W
8''SS
8''SS
8''SS
8''SS
8''SS 8''SS 8''SS 8''SS 8''SS
8''SS 8''SS 8''SS4''O 4''O 4''O 4''O 4''O6''O 6''O 6''O 6''O 8''SS 8''SS 8''SS 8''SS

S S S S S S S
8''SS
SS(ABAN)SS(ABAN)6''W6''W6''W6''W 6''W 6''W 6''W
UE

UE UE UE
18''S
D 2''G2''G 2''G
2''G

FLORENCE AVE
0+00 1+00 2+00

FLORENCE AVENUE
EX. 8" VCP SEWER
39' N/CL
100'50'38'50'38'EX. CURB AND GUTTER
(SEE NOTE NO. 5)1
US MH N2307
STA. 0+00
DS MH N2306
STA. 2+61
SPOT REPAIR NO. 1
STA. 2+52 (±6 LF)
LOCATION 6
PLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24

SEWER SPOT REPAIR PLAN

SITE CHARACTERISTICS
LOCATION 6 7 8 9 10

TYPE OF PAVEMENT/

GROUND SURFACE ASPHALT ASPHALT ASPHALT CONCRETE ASPHALT EXISTING PIPE 8" VCP 8" VCP 8" VCP 8" VCP 8" VCP
APPROX. DEPTH TO TOP OF PIPE 7.5'7'5.5'2'8.5'
PIPE ID P2141 P0057 P1211 P1209 P2298

DISTANCE FROM

MANHOLE
UPSTREAM 30' 46.5' 105.5' 108.5' 58' 95' 252'
DOWNSTREAM 315' 298.5' 163.5' 186.5' 159'122'9'

STREET GUATEMALA AVENUE CHANEY AVENUE PICO VISTA ROAD DALEWOOD AVENUE FLORENCE AVENUE DAMAGE
BROKEN
(11 TO 3 O'CLOCK)

MULTIPLE

FRACTURES
(2 TO 5 O'CLOCK)

MEDIUM JOINT
OFFSET
BROKEN
(1 TO 6 O'CLOCK)
BROKEN
(8 TO 4 O'CLOCK)
BROKEN
(5 TO 1 O'CLOCK)
BROKEN
(6 TO 11 O'CLOCK)
0 SCALE:
20' 40' 80'
1'' = 40'
LOCATION 7
LOCATION 8 LOCATION 9
LOCATION 10
N

N NFOSTER BRIDGE BLVD VISTA DEL RIO BLVD

ALIWIN STREETSAN GABRIEL RIVER
1 1
1 2
2 2
1 1
1 1
1 1
2 2
1 2
NOTES TO CONTRACTOR:

1. CONTRACTOR SHALL FIELD VERIFY THE SIZE, MATERIAL,

HORIZONTAL, AND VERTICAL LOCATION OF ALL CONNECTION POINTS

AND ALL UTILITY CROSSINGS PRIOR TO ANY CONSTRUCTION
ACTIVITY.

2. CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE DRIVEWAYS, DRIVEWAYS AND STREET INTERSECTIONS AT ALL TIMES.

3. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES

NECESSARY TO PROTECT IN PLACE EXISTING UTILITIES AND THRUST BLOCKS.

4. ANY SEWER LATERAL THAT IS DAMAGED WITHIN THE SPOT REPAIR LOCATION IS TO BE REPLACED PER DETAIL 6 ON SHEET 12.

5. FOR INSTALLATION IMPACTING THE EXISTING CURB AND GUTTER,

CONTRACTOR SHALL REMOVE AND REPLACE TO THE NEAREST
WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 1.

6. FOR INSTALLATIONS IMPACTING THE EXISTING CONCRETE SIDEWALK,

CONTRACTOR SHALL REMOVE AND REPLACE TO THE NEAREST
WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 5.

TELEGRAPH ROAD
PROJECT AREA 1 LOCATIONS 6-7 AND PROJECT AREA 2 LOCATIONS 8-10

SUVA STREET CALMCREST DRIVE NN

SUSAN AVENUE
1 1

7201 7203 7209 7215 7221 7227 7233 7239
7202 7208 7214 7220 7226 7232 7238
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS
4''W 4''W 4''W 4''W 4''W 4''W
4''W20''SD 20''SD 20''SD 20''SD 20''SD 20''SD 20''SD
2''G 2''G 2''G

SSSSSSSS

GGGGGGG

GG G G G G G G

IRWINGROVE DRIVE
0+00 1+00 2+00 3+00 4+00
US MH N2301
STA. 0+00 DS MH N2300
STA. 3+54
SPOT REPAIR NO. 3
STA. 3+37.5 (±3 LF)
SPOT REPAIR NO. 2
STA. 2+59 (±8 LF)
SPOT REPAIR NO. 1
STA. 0+69 (±4 LF)
EX. 8" VCP SEWER
5' S/CL 60'30'18'30'18'1
5 1
1 7233 7239 7245 7251 7301 7307 7315 7319
7232 7238 7244 7302 7308 7314
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS
4''W 4''W 4''W 4''W 4''W 4''W
20''SD 20''SD 20''SD 20''SD20''SD2''G 2''G 2''G 2''G 2''G SSSSSS

G GGGGGG

G G GG G G G G
4+00 5+00 6+00 7+00
US MH N2300
STA. 3+54 DS MH N2299
STA. 7+09
SPOT REPAIR NO. 1
STA. 5+99 (±6 LF)

IRWINGROVE DRIVE
EX. 8" VCP SEWER
5' S/CL 60'30'18'30'18'1
10949 10945 10939 10933 10927 10923 10919 10915 10911
10944 10940 10930 106278''SS2''G6''W2''G 2''G4''W 4''W 4''W 4''W 6''W
6''W
6''W
8''SS 8''SS 8''SS
8''SS
8''SS
8''SS
S
SS
SSSS
S
S
SSS
16''RW 16''RW 16''RW 16''RW 16''RW
16''RW
UE
UE
G G
G
G
G G
G G
G

RIO HONDO DRIVE
0+00
1+00 2+00
3+00
DS MH N2025
STA. 0+00
US MH N2029
STA. 3+48
SPOT REPAIR NO. 1
STA. 3+36 (±8 LF)
EX. 8" VCP SEWER
5' W/CL60'30'20'20'30'1
10723737173637359735173457337
7327
7322
7332 7336 7348 7356 7364 7370 7374 7380
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS
4''W 4''W 4''W 4''W 4''W 4''W 4''W 4''W
4''W 4''W 4''W 4''W 4''W 4''W 4''W 4''W
2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G
2''G
6''W 6''W6''W6''W3''G3''G3''GUTUTSSSSSS6''W6''WG G G G G G GGGG
S
SS
S
SSS
S

RIO HONDO PLACE
0+00 1+00 2+00
US MH N2184
STA. 0+00
DS MH N2183
STA. 2+78
SPOT REPAIR NO. 2
STA. 2+58 (±5 LF)
SPOT REPAIR NO.1
STA. 1+76 (±8 LF)
EX. 8" VCP SEWER
ON CL 60'30'20'30'20'1 1
SEWER CONSTRUCTION NOTES:

ISOLATE, REMOVE, AND REPLACE BROKEN PIPE WITH NEW 8" EXTRA STRENGTH VCP SEWER MAIN AND REPAIR COUPLINGS PER DETAIL 4 ON SHEET 12. 1 REMOVE AND REPLACE LATERAL CONNECTION WITH NEW 8" X 6" EXTRA STRENGTH VCP WYE AND REPAIR COUPLINGS.
5 7409 7419 7435 7441 7447
7446744074347428742274147406
2''G
2''G
2''G 2''G 2''G
6''W
6''W
6''W 6''W
8''SS6''W6''W2''GSS
SS
SSS
SSS
8''SS
8''SS
8''SS
G
G
G
G G G
G G G
0+00
1+00
2+00

FOSTORIA STREET
EX. 8" VCP SEWER
VARIES 60'30'18'30'18'1
1 US MH N3845
STA. 0+00
DS MH N3044
STA. 2+76
SPOT REPAIR NO. 1
STA. 0+71 (±25 LF)
SPOT REPAIR NO. 2
STA. 0+92 (±4 LF)
LOCATION 11
PLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24

SEWER SPOT REPAIR PLAN

SITE CHARACTERISTICS
LOCATION 11 12 13 14 15

TYPE OF PAVEMENT/

GROUND SURFACE ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT
EXISTING PIPE 8" VCP 8" VCP 8" VCP 8" VCP 8" VCP
APPROX. DEPTH TO TOP OF PIPE 7.5' 8.5' 5.5'11' 7'
PIPE ID P2294 P2293 P2091 P2579 P3049

DISTANCE FROM

MANHOLE
UPSTREAM 69' 259' 337.5' 245'12'176' 258'71'92'
DOWNSTREAM 285' 95' 16.5' 110' 336' 102' 20' 205' 184'

STREET IRWINGROVE DRIVE

IRWINGROVE
DRIVE

RIO HONDO

DRIVE RIO HONDO PLACE FOSTORIA STREET
DAMAGE
BROKEN - 8 TO 5 O'CLOCK BROKEN
(8 O'CLOCK) /

MULTIPLE

FRACTURES
(8 TO 4 O'CLOCK)

MEDIUM JOINT
OFFSET
BROKEN
(2 TO 8 O'CLOCK)

LONGITUDINAL

FRACTURE
(9 TO 3 O'CLOCK) /
BROKEN
(8 TO 4 O'CLOCK)BROKEN - 9 TO 4 O'CLOCK BROKEN
(3 TO 9 O'CLOCK)
BROKEN - 8 TO 11 O'CLOCK BROKEN
(8 TO 4 O'CLOCK)
0 SCALE:
20' 40' 80'
1'' = 40'
LOCATION 12
LOCATION 13 LOCATION 14
LOCATION 15
N N
N
N

SHERRY AVENUE SUSAN AVENUE

PELLET STREET

OLD RIVER SCHOOL ROAD
1 1
2 2
3 3
1 1
1 1
1 1
2 2
1 2
1 2
3 NOTES TO CONTRACTOR:

1. CONTRACTOR SHALL FIELD VERIFY THE SIZE, MATERIAL,

HORIZONTAL, AND VERTICAL LOCATION OF ALL CONNECTION POINTS

AND ALL UTILITY CROSSINGS PRIOR TO ANY CONSTRUCTION
ACTIVITY.

2. CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE DRIVEWAYS, DRIVEWAYS AND STREET INTERSECTIONS AT ALL TIMES.

3. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES

NECESSARY TO PROTECT IN PLACE EXISTING UTILITIES AND THRUST BLOCKS.

4. ANY SEWER LATERAL THAT IS DAMAGED WITHIN THE SPOT REPAIR LOCATION IS TO BE REPLACED PER DETAIL 6 ON SHEET 12.

5. FOR INSTALLATIONS IMPACTING THE EXISTING CURB AND GUTTER,

CONTRACTOR SHALL REMOVE AND REPLACE TO THE NEAREST
WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 1
PROJECT AREA 3 LOCATIONS 11-15

NORLAIN AVENUE
N
1 2
1 1
2 2

7545
75447538753275287522
75377529
2''G 2''G 2''G 2''G 2''G 2''G6''W 6''W 6''W 6''W 6''W 6''W 8''SS 8''SS 8''SS 8''SS
33''SS 33''SS 33''SS 27''SS54''SD54''SD54''SD8''SSS

SS S S S
SSSSS2ND STREET
0+00 1+00
DS MH N3101
STA. 0+00
US MH N5224
STA. 1+78
SPOT REPAIR NO. 2
STA. 0+15 (±5 LF)
SPOT REPAIR NO. 1
STA. 1+21.5 (±5 LF)
EX. 8" VCP SEWER
ON CL 60'30'18'30'18'1
51 774177257713770576577649
7738773077227714770476567646
7729 7735
4''W 4''W 4''W 4''W 4''W 4''W 4''W 4''W
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SS
4''W 4''W 4''W 4''W 4''W 4''W 4''W 4''W 4''W
2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G SSSSSS6''W6''W6''W2''G2''G2''GSSSSS

SSSSSSS
3RD STREET
0+00 1+00 2+00 3+00
DS MH N3110
STA. 0+00 US MH N3111
STA. 3+01
SPOT REPAIR NO. 2
STA. 1+15 (±14 LF)
SPOT REPAIR NO. 1
STA. 2+69 (±8 LF)
EX. 8" VCP SEWER
ON CL 60'30'20'20'30'1 1
7800 7810 7820 7824 7828 7840
7805 7807 7813 7821 7827 7833 7839
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS 8''SSW (ABAN)W (ABAN)W (ABAN)W (ABAN)W (ABAN) 4''W 4''W 4''W 4''W 4''W 4''W 4''WOEOEOEOEOEOEOE2''G 2''G 2''G 2''G 2''G 2''G 2''G IRRIRRIRR8''W8''W8''WW (ABAN)W (ABAN)S S S S S
SSSSSALLEY BETWEEN 4TH PLACE AND 3RD STREET
0+00 1+00 2+00 3+00 4+00
US MH N2766
STA. 0+00
DS MH N2765
STA. 2+93
SPOT REPAIR NO. 1
STA. 1+07 (±4 LF)
SPOT REPAIR NO. 2
STA. 1+87 (±4 LF)
EX. 8" VCP SEWER
4' S/CL

PROTECT IN PLACE
EX. V-GUTTER
(SEE NOTE NO. 8)20'10'EX. CONCRETE ALLEY
(SEE NOTE NO. 7)
1 1
7457 7505 75157447744174357429
7428 7432 7438 7446 7502 7508 7514
4''W 4''W 4''W 4''W 4''W 4''W
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS
4''W 4''W 4''W 4''W 4''W 4''W
2''G 2''G 2''G 2''G 2''G 2''G 2''G
SS

SSSSS S S S S
SS
S4''WG

G G G G
GGGGGG
3RD STREET
0+00 1+00 2+00 3+00
DS MH N3106
STA. 0+00
US MH N3107
STA. 3+27
SPOT REPAIR NO. 2
STA. 1+30 (±11 LF)
SPOT REPAIR NO. 1
STA. 1+96 (±3 LF)
EX. 8" VCP SEWER
ON CL60'30'20'30'20'1
1 5
SEWER CONSTRUCTION NOTES:

ISOLATE, REMOVE, AND REPLACE BROKEN PIPE WITH NEW 8" EXTRA STRENGTH VCP SEWER MAIN AND REPAIR COUPLINGS PER DETAIL 4 ON SHEET 12. 1 REMOVE AND REPLACE LATERAL CONNECTION WITH NEW 8" X 6" EXTRA STRENGTH VCP WYE AND REPAIR COUPLINGS.
5 7828 7840 7900 7908 7912
7833 7839 7903 7911
8''SS 8''SS 8''SS 8''SS 8''SSW (ABAN)W (ABAN)W (ABAN)
4''W 4''W 4''W 4''W 4''WOEOEOEOE OE2''G 2''G 2''G 2''G 2''G IRRIRRIRR8''W8''W8''WW (ABAN)W (ABAN)S S
SS3+00 4+00 5+00
ALLEY BETWEEN 4TH PLACE AND 3RD STREET
EX. 8" VCP SEWER
4' S/CL20'10'EX. CONCRETE ALLEY INTERSECTION
(SEE NOTE NO. 9)EX. CONCRETE ALLEY
(SEE NOTE NO. 7)

PROTECT IN PLACE

EXIST V-GUTTER
(SEE NOTE NO. 8)
EX. CONCRETE ALLEY
(SEE NOTE NO. 7)
1 1
US MH N2765
STA. 2+93
DS MH N2764
STA. 5+91
SPOT REPAIR NO. 1
STA. 3+05.5 (±8 LF)
SPOT REPAIR NO. 2
STA. 4+62.5 (±6 LF)
LOCATION 16
PLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24

SEWER SPOT REPAIR PLAN

SITE CHARACTERISTICS
LOCATION 16 17 18 19 21

TYPE OF PAVEMENT/

GROUND SURFACE ASPHALT ASPHALT ASPHALT CONCRETE CONCRETE EXISTING PIPE 8" VCP 8" VCP 8" VCP 8" VCP 8" VCP
APPROX. DEPTH TO TOP OF PIPE 10' 7.5'7'7.5' 8'
PIPE ID P3376 P3095 P3379 P2563 P2562

DISTANCE FROM

MANHOLE
UPSTREAM 131' 197' 56.5' 163' 32' 186' 107' 187' 12.5' 169.5' DOWNSTREAM 196' 130' 121.5' 15' 269' 115' 186' 106' 285.5' 128.5' STREET 3RD STREET 2ND STREET 3RD STREET

ALLEY BETWEEN
4TH PLACE AND
3RD STREET

ALLEY BETWEEN
4TH PLACE AND
3RD STREET
DAMAGE
BROKEN
(4 TO 8 O'CLOCK)

MULTIPLE CRACKS
(1 TO 3 O'CLOCK) /
BROKEN
(7 TO 5 O'CLOCK)
BROKEN
(3 TO 7 O'CLOCK) /
BROKEN
(4 TO 8 O'CLOCK)
BROKEN
(12 TO 12 O'CLOCK)
BROKEN
(8 TO 4 O'CLOCK) /
BROKEN
(SOIL VISIBLE)
(2 TO 5 O'CLOCK)
BROKEN
(4 O'CLOCK)
BROKEN
(3 TO 9 O'CLOCK)
BROKEN
(2 TO 10 O'CLOCK)
BROKEN
(4 TO 8 O'CLOCK)
BROKEN
(7 TO 5 O'CLOCK)
0 SCALE:
20' 40' 80'
1'' = 40'
LOCATION 17
LOCATION 18 LOCATION 19
LOCATION 20

POMERING ROAD

WILEY BURKE AVENUE
N
N
N
N

RIVES AVENUE SMALLWOOD AVENUE
1 1
2 2
1 1
1 1
1 1
2 2
2 2
2 2
1 2
1 1
1 2 2 2
NOTES TO CONTRACTOR:

9. FOR INSTALLATIONS IMPACTING THE EXISTING CONCRETE ALLEY

INTERSECTION, CONTRACTOR SHALL REMOVE AND REPLACE TO THE NEAREST WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO 15.

PROJECT AREA 3 LOCATIONS 16-20

SMALLWOOD AVENUE
N
1 2
1 1
2 2
NOTES TO CONTRACTOR:

1. CONTRACTOR SHALL FIELD VERIFY THE SIZE, MATERIAL,

HORIZONTAL, AND VERTICAL LOCATION OF ALL CONNECTION POINTS

AND ALL UTILITY CROSSINGS PRIOR TO ANY CONSTRUCTION
ACTIVITY.

2. CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE DRIVEWAYS, DRIVEWAYS AND STREET INTERSECTIONS AT ALL TIMES.

3. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES

NECESSARY TO PROTECT IN PLACE EXISTING UTILITIES AND THRUST BLOCKS.

NOTES TO CONTRACTOR:

4. ANY SEWER LATERAL THAT IS DAMAGED WITHIN THE SPOT REPAIR LOCATION IS TO BE REPLACED PER DETAIL 6 ON SHEET 12.

7. THE EXISTING PCC PORTION OF THE ROAD (LOCATED AT LOCATION 19 AND LOCATION 20) IS AN AVERAGE OF 8" THK REINFORCED
CONCRETE. THE CONTRACTOR WILL BE REQUIRED TO SAW CUT AND

FORM NEAT CLEAN CUTS AND WILL BE REQUIRED TO REPLACE THE PCC. TRENCH SHALL BE REPLACED PER DWG. NO. 5-S ON SHEET 13.

8. IF THE EXISTING V-GUTTER IS DAMAGED DURING CONSTRUCTION, THE CONTRACTOR SHALL REPLACE IN KIND.

11111
80368043
11019
8101
11030
11032 11016
8102
8104
6''W 6''W 6''W 6''W 6''W 6''W
2''G 2''G 2''G 2''G

SD SD SD SD SD SD
8''SS 8''SS
UE
8''SS 8''SS 8''SS
UE UE
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS
2''G2''G2''G2''G2''GUE15''SS15''SS8''SS2''W2''W8''W8''W2''W2''W2''WUTUTS UE UES
S8"SSMYRTLE STREET
1+00 2+00
DS MH N3009
STA. 0+00
SPOT REPAIR NO. 1
STA. 0+12 (±12 LF)
EX. 8" VCP SEWER
ON CL 60'30'24'30'18'US MH N3012
STA. 2+02
1 10821108217967796379577953794779457937
108417974796679627956
7950
7952794679427936
8''SS 8''SS 8''SS 8''SS 8''SS 8''SS
2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G
8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W
10''SS10''SSSS
SSS
SSS
SSS
SSSSSS
SSS
UTUT2''G2''G2''G2''GUEUEUTUT8''W8''W24''W24''WUEUE4TH STREET 0+00 1+00 2+00
US MH N3266
STA. 0+00
DS MH N3265
STA. 2+76
SPOT REPAIR NO. 2
STA. 1+38 (±4 LF)SPOT REPAIR NO. 1
STA. 0+40 (±4 LF)
EX. 8" VCP SEWER
ON CL 50'25'18'25'18'1 1
11021814181258117
8121 8141 8136 8138 11101
24''SD 24''SD 24''SD 24''SD 24''SD 24''SD 24''SD2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G 2''G

UE UE UE UE UEUTUTUTUT UT
15''SS 15''SS 15''SS 15''SS 15''SS
8''SS
2''W 2''W 2''W 2''W 2''W 2''W 2''W
8''W 8''W 8''W 8''W 8''W 8''W 8''W2''W 2''W 2''W 2''W 2''W 2''W 2''W

UT UT UT UT UT
SSSSSSS8''SS8''SS8''SS8''W8''W8''W2''G2''G2''G8''SS 8''SS 8''SS 2ND STREET
1+00 2+00
DS MH N3024
STA. 0+00
US MH N3025
STA. 2+57
SPOT REPAIR NO. 1
STA. 1+53 (±4 LF)
EX. 8" VCP SEWER
22' S/CL
EX. CONCRETE SIDEWALK
(SEE NOTE NO. 6)60'30'20'20'30'PROTECT IN PLACE

EXIST WATER METER
(SEE NOTE NO. 10)
1 SEWER CONSTRUCTION NOTES:

ISOLATE, REMOVE, AND REPLACE BROKEN PIPE WITH NEW 8" EXTRA STRENGTH VCP SEWER MAIN AND REPAIR COUPLINGS PER DETAIL 4 ON SHEET 12. 1 12903
12909 12832 8801
12817
2''G2''G4''W
OE
OE OE8''SS 8''SS 8''SS 8''SS 8''SS 8''SS8''SS8''W
8''W 8''W 8''W 8''W 8''W
SD
SD SD SD SD SD8''W 8''W
8''SS8''SS2''G2''GOE OE OE
UE

UE UE UE
0+00 1+00 2+00 3+00

CHEYENNE STREET
EX. 8" VCP SEWER
13' N/CL50'22'16'28'16'1SPOT REPAIR NO. 1
STA. 0+34 (±12 LF)
DS MH N5489
STA. 0+00
US MH N5490
STA. 3+48
8221 10909
8237 10901
8''SS 8''SS 8''SS 8''SS
UE UE
8''SS
2''G 2''G 2''G 2''G 2''G 2''G 2''G
2''G 2''G 2''G 2''G 2''G 2''G 2''G
6''W 6''W 6''W 6''W 6''W 6''W 6''W15''SS15''SSUEUE2''G2''G2''G2''G2''G2''G4''W4''W20''W20''W20''WSS SS
SSS
1+00 2+00 3+00

NEW STREET
EX. 8" VCP SEWER
ON CL50'25'19'19'25'1 1
DS MH N2866
STA. 0+00.00
US MH N2867
STA. 3+50
SPOT REPAIR NO. 2
STA. 0+04 (±4 LF)SPOT REPAIR NO. 1
STA. 2+95 (±4 LF)
LOCATION 21
PLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24

SEWER SPOT REPAIR PLAN

SITE CHARACTERISTICS
LOCATION 21 22 23 24 25

TYPE OF PAVEMENT/

GROUND SURFACE ASPHALT ASPHALT

CONCRETE

SIDEWALK ASPHALT ASPHALT
EXISTING PIPE 8" VCP 8" VCP 8" VCP 8" VCP 8" VCP
APPROX. DEPTH TO TOP OF PIPE 8.5' 8.5' 7.5' 11.5'7'
PIPE ID P3284 P3012 P3026 P2782 P5501

DISTANCE FROM

MANHOLE
UPSTREAM 40' 138' 190' 104' 55' 346' 314'
DOWNSTREAM 236' 138'12'153' 295'4'34'
STREET 4TH STREET MYRTLE STREET 2ND STREET NEW STREET CHEYENNE STREET DAMAGE
BROKEN
(12 TO 12 O'CLOCK)
BROKEN
(SOIL VISIBLE)
(7 TO 8 O'CLOCK)
/ BROKEN
(4 TO 5 O'CLOCK)

OBSTRUCTION /

MISC SURVEY

ABANDONED
HOLE
(8 T0 9 O'CLOCK)LARGE JOINT OFFSET
(BROKEN SOIL VISIBLE)
(6 TO 9 O'CLOCK)
BROKEN
(12 TO 12 O'CLOCK)
HOLE
(7 TO 8 O'CLOCK)
LOCATION 22
LOCATION 23 LOCATION 24
LOCATION 25
PARAMOUNT BLVD 2ND STREET

N NLA REINA AVENUE
N
1 1
2 2
1 1
1 1
2 1
NOTES TO CONTRACTOR:

1. CONTRACTOR SHALL FIELD VERIFY THE SIZE, MATERIAL,

HORIZONTAL, AND VERTICAL LOCATION OF ALL CONNECTION

POINTS AND ALL UTILITY CROSSINGS PRIOR TO ANY
CONSTRUCTION ACTIVITY.

2. CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE DRIVEWAYS, DRIVEWAYS AND STREET INTERSECTIONS AT ALL TIMES.

3. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES

NECESSARY TO PROTECT IN PLACE EXISTING UTILITIES AND
THRUST BLOCKS.

4. ANY SEWER LATERAL THAT IS DAMAGED WITHIN THE SPOT REPAIR LOCATION IS TO BE REPLACED PER DETAIL 6 ON SHEET 12.

6. FOR INSTALLATIONS IMPACTING THE EXISTING CONCRETE

SIDEWALK, CONTRACTOR SHALL REMOVE AND REPLACE TO THE
NEAREST WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 5

10. IF THE EXISTING WATER METER BOX, METER, AND WATER SERVICE

IS DAMAGED DURING CONSTRUCTION, THE CONTRACTOR SHALL
REPLACE IN KIND.

PROJECT AREA 3 LOCATIONS 21-25
4TH STREET

AIRPOINT AVENUE
3RD STREET

BLODGETT AVENUE NN
1 1
2 2
1 2
1 1
0 SCALE:
20' 40' 80'
1'' = 40'

95039509 9345 9331
95029508 9356 9350
9335
9346
6''W6''W6''W6''W2''G 2''G 2''G 2''G 2''G
24''SS 24''SS 24''SS 24''SS 24''SS
6''W 6''W 6''W 6''W 6''W72''SD72''SD72''SD72''SD72''SD 72''SD S
SS
SS
SS
SS
SOE OE OE OE OE8''SS 8''SS 8''SS

PARROT AVENUE
1 2 3

BROCK AVENUE
DS MH N0007
STA. 1+00.00 US MH N0008
STA. 3+54±
SPOT REPAIR NO. 1
STA. 2+13 (±10 LF)
CONSTRUCT NEW 48" MH
PER DTL 1 ON SHT 12 &
DTL 1 ON SHT 13
STA. 1+98.00

EXIST CURB AND GUTTER
(SEE NOTE NO. 5)

EXIST CONCRETE SIDEWALK
(SEE NOTE NO. 6)6' EASEMENT(CITY OF DOWNEY)60'
30'
18'
30'
18'
3 1
2'±
81009509 9343 9339
95029508 9344 9340
9333
9334
S
SS
S4''W4''W4''W2''G 2''G 2''G 2''G 2''G
24''SS 24''SS 24''SS 24''SS 24''SS
6''W 6''W 6''W 6''W 6''W
72''SD 72''SD
4''W 4''W 4''W 4''W 4''W
S
SS
SS
SOE OE OE OE OE8''SS 8''SS 8''SS
1 2 3

BROCK AVENUE

ORIZABA AVENUE
US MH
STA. 3+57±
CONSTRUCT NEW 48" MH
PER DTL 2 ON SHT 12 &
DTL 1 ON SHT 13
STA. 2+00.00
6' EASEMENT(CITY OF DOWNEY)DS MH
STA. 1+00.00
60'
30'
18'
30'
18'
3 SCALE: HORIZ: 1"= 40' VERT: 1"= 4'

PROFILE SUVA ST WEST
115
120
125
130
135
140
145
115
120
125
130
135
140
145
0+60 1+00 2+00 3+00 3+80EXIST 48" MHSTA 1+00.00RIM 134.3±STA 1+02.00(INV 127.38±)STA 3+52±(INV 128.36±)250± LF 8" VCP PIPE @ 0.40%

EXISTING SURFACE

OVER CL OF PIPE

PROTECT IN PLACE
EXIST 8" VCP

PROTECT IN PLACE
EXIST 8" VCP
72" SD
6" W
STA 1+96.00(INV 127.75±)STA 2+00.00(INV 127.76±)NEW 48" MHSTA 1+98.00RIM 134.6±EXIST 48" MHSTA 3+54±RIM 135.1±SCALE: HORIZ: 1"= 40' VERT: 1"= 4'

PROFILE SUVA ST EAST
120
125
130
135
140
145
150
120
125
130
135
140
145
150
0+60 1+00 2+00 3+00 3+80EXIST 48" MHSTA 3+57±RIM 135.0±EXIST 48" MHSTA 1+00.00RIM 134.5±STA 1+02.00(INV 127.09±)STA 3+55±(INV 128.08±)253± LF 8" VCP PIPE @ 0.40%NEW 48" MHSTA 2+00.00RIM 134.7±STA 1+98.00(INV 127.47±)STA 2+02.00(INV 127.48±)PROTECT IN PLACE EXIST 8" VCP

PROTECT IN PLACE
EXIST 8" VCP

EXISTING SURFACE

OVER CL OF PIPE
4" W
SEWER CONSTRUCTION NOTES:

ISOLATE, REMOVE, AND REPLACE BROKEN PIPE WITH NEW 8" EXTRA STRENGTH VCP SEWER MAIN AND REPAIR COUPLINGS PER DETAIL 4 ON SHEET 12. 1 INSTALL NEW 48" OLDCASTLE PRECAST SEWER MANHOLE WITH
POLYPROPYLENE STEPS, LANE MODEL P-14938 PER DETAIL 1 ON SHEET 13. 3 PLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24

SEWER IMPROVEMENT PLAN AND PROFILE

SUVA STREET

SUVA STREET
0 SCALE:
20' 40' 80'
1'' = 40'

SITE CHARACTERISTICS

LOCATION

SUVA ST BETWEEN

BROCK AVE AND

PARROT AVE

TYPE OF PAVEMENT/

GROUND SURFACE ASPHALT
EXISTING PIPE 8" VCP
APPROX. DEPTH TO TOP OF PIPE 6'
PIPE ID P0318

DISTANCE FROM

MANHOLE
UPSTREAM 141'
DOWNSTREAM 113'

STREET SUVA STREET

DAMAGE MEDIUM JOINT
OFFSET
1 1
NOTES TO CONTRACTOR:

1. CONTRACTOR SHALL FIELD VERIFY THE SIZE, MATERIAL,

HORIZONTAL, AND VERTICAL LOCATION OF ALL CONNECTION POINTS

AND ALL UTILITY CROSSINGS PRIOR TO ANY CONSTRUCTION
ACTIVITY.

2. CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE DRIVEWAYS, DRIVEWAYS AND STREET INTERSECTIONS AT ALL TIMES.

3. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES

NECESSARY TO PROTECT IN PLACE EXISTING UTILITIES AND THRUST BLOCKS.

5. FOR INSTALLATIONS IMPACTING THE EXISTING CURB AND GUTTER,

CONTRACTOR SHALL REMOVE AND REPLACE TO THE NEAREST
WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 1.

6. FOR INSTALLATIONS IMPACTING THE EXISTING CONCRETE SIDEWALK,

CONTRACTOR SHALL REMOVE AND REPLACE TO THE NEAREST
WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 5.

SEVERY STREET

INSTALLATION OF NEW MANHOLESNN

9251
9252 9306 9310 9320
9323931793119303
9330
9331
8''SS 8''SS 8''SS 8''SS 8''SS
6''W 6''W 6''W 6''W 6''W 6''W
3''G 3''G 3''G 3''G 3''G 3''G
4''G 4''G 4''G 4''G 4''G 4''G
UT UT8''SS6''W2''G48''SD66''SD6''WUTUE2''GS
SS S
SSS

GALLATIN ROAD
1 2 3 4
60'30'18'30'18'STA 1+02.00

JOIN EXIST MH
STA 1+22±
JOIN EXIST 8" VCP SEWER
PER DTL 4 ON SHT 12

NEW VCP SEWER MAIN

EXIST CONCRETE

CROSS GUTTER
(SEE NOTE NO. 11)
DS MH N0810
STA 1+00.00

PROTECT IN PLACE
EXIST 48" MH
9 US MH N1198
STA 4+09±
4 7901
7871
7873
7918
7922
6''W6''W6''W2''G2''G2''G8''SS8''SS8''SS8''W8''W79''W79''W3''G2''GUTUT8''SS8''SS8''SS8''SS8''SS8''SS36''SD18''SDS 8''SS 8''SS 8''SS 8''SS 8''SS8''W 8''W 8''W 8''W
ALLEY
1 2 3 4 58' EASEMENT(CITY OF DOWNEY)NEW VCP SEWER MAIN
STA 4+46.00

JOIN EXIST
8" VCP SEWER
PER DTL 4 ON SHT 12
STA 4+21±

JOIN EXIST MH
STA 4+17±

JOIN EXIST MH
STA 3+29.00
JOIN EXIST 8" VCP SEWER
PER DTL 4 ON SHT 12 DS/US MH N1511
STA 4+19±

PROTECT IN PLACE
EXIST 48" MH
9 9

EXIST BLOCK WALL
US MH N2606
STA 5+30±
DS MH N1512
STA 1+00.00 EXIST ASPHALT ALLEY
4 SCALE: HORIZ: 1"= 40' VERT: 1"= 4'
PROFILE GALLATIN ROAD (P1233)
110
115
120
125
130
135
140
145
110
115
120
125
130
135
140
145
0+60 1+00 2+00 3+00 4+00 4+40STA 1+02.00JOIN EXIST MH(INV 124.24±)PROTECT IN PLACE EXIST 8" VCP
STA 4+07±(INV 124.99±)STA 1+22±JOIN EXIST 8" VCP(INV 124.29±)EXIST 48" MHSTA 1+00.00RIM 131.8±EXIST 48" MHSTA 4+09±RIM 135.8±305± LF 8" CIP/VCP PIPE @ 0.24%

EXISTING SURFACE

OVER CL OF PIPE
48" SD
TELE
6" W 2" G
ELEC
SCALE: HORIZ: 1"= 40' VERT: 1"= 4'
PROFILE ALLEY (P2915 & P2914)
90 95
100
105
110
115
120
125
90 95
100
105
110
115
120
125
0+60 1+00 2+00 3+00 4+00 5+00 5+60EXIST 48" MHSTA 1+00.00RIM 108.5±EXIST 48" MHSTA 4+20±RIM 109.0±EXIST 48" MHSTA 5+30±RIM 109.1±89'± REMOVE EXIST 8" CIP
REPLACE WITH NEW 8" VCP
STA 1+02.00(INV 102.70±)STA 3+29.00JOIN EXIST 8" VCP(INV 103.24±)STA 4+18±JOIN EXIST MH(INV 103.45±)STA 4+22±JOIN EXIST MH(INV 103.46±)STA 4+46.00JOIN EXIST 8" VCP(INV 103.52±)STA 5+28±(INV 103.72±)426± LF 8" CIP/VCP PIPE @ 0.24%

PROTECT IN PLACE
EXIST 8" VCP

EXISTING SURFACE

OVER CL OF PIPE
2" G
TELE
6" W
2" G
8" W
24'±
REMOVE EXIST 8" CIP
REPLACE WITH NEW 8" VCP

PROTECT IN PLACE
EXIST 8" VCP
SEWER CONSTRUCTION NOTES:

REMOVE AND REPLACE INTERFERING PORTION OF EXISTING SEWER MAIN WITH NEW 8" EXTRA STRENGTH VCP SEWER MAIN IN SAME ALIGNMENT AND CONNECT TO EXISTING SEWER MAIN PER DETAIL 4 ON SHEET 13. 4 JOIN EXISTING MANHOLE PER DETAIL 3 ON SHEET 12.9
PLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24 SEWER IMPROVEMENT PLAN AND PROFILE

LEMORAN AVENUE

LEMORAN AVENUE

STEWART AND GRAY ROAD DE PALMA STREET
N N0
SCALE:
20' 40' 80'
1'' = 40'
NOTES TO CONTRACTOR:

1. CONTRACTOR SHALL FIELD VERIFY THE SIZE, MATERIAL,

HORIZONTAL, AND VERTICAL LOCATION OF ALL CONNECTION POINTS

AND ALL UTILITY CROSSINGS PRIOR TO ANY CONSTRUCTION
ACTIVITY.

2. CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE DRIVEWAYS, DRIVEWAYS AND STREET INTERSECTIONS AT ALL TIMES.

3. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES

NECESSARY TO PROTECT IN PLACE EXISTING UTILITIES AND THRUST BLOCKS.

11. FOR INSTALLATIONS IMPACTING THE EXISTING CONCRETE CROSS

GUTTER, CONTRACTOR SHALL REMOVE AND REPLACE TO THE
NEAREST WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 2.

PRUESS AVENUE

9722
9313
9308 9302 92649316 9260 9254
9259 9253
6''W 6''W
S S 8''SS4''W4''W2''G
SSSS6''W8''SS 8''SS 8''SSCO18''SDSSDALEWOOD AVENUE
1 2 360'30'18'18'30'NEW VCP SEWER MAIN
3'STA 1+53±

JOIN EXIST SHALLOW MH
PER DTL 5 ON SHT 12
DS MH N1187
STA 1+55±

PROTECT IN PLACE
EXIST 48" MH

EXIST CONCRETE SIDEWALK
(SEE NOTE NO. 6)
US CO N0685
STA 1+00.00

REMOVE EXIST CLEANOUT

CONSTRUCT NEW CLEANOUT
PER DTL 6 ON SHT 12
5 4
8 8041 11111
8111 8111
6''W 6''W 6''W 6''W
2''G 2''G 2''G
4''G4''G4''G10''W10''W10''W4''W4''W4''W4''W4''W4''WSDSD SD SD 8''SS8''SS8''SS8''SS 8''SS 8''SS 8''SS
8''SS 8''SS 8''SS
S
S8''SSS15''SS15''SSUE UE

UEMYRTLE STREET
1 2 60'30'24'18'30'NEW VCP SEWER MAIN
STA 1+32±
JOIN EXIST 8" VCP SEWER
PER DTL 4 ON SHT 12
STA 1+02.00

JOIN EXIST MH
DS MH N3007
STA 1+00.00

PROTECT IN PLACE
EXIST 48" MH
9 4 7
84468440 8504 8512
8''SS 8''SS16''W
16''W 16''W
1 6
'
'W
16''W
2''G2''G
8''SS2''G2''G2''G2''G21''SS21''SS21''SSS
S
8''SS
6''W6''W6''WUEUE UE

IMPERIAL HWY
1 2
80'
40'
28'28'
40'4'28'US MH N4658
STA 1+00.00

PROTECT IN PLACE
EXIST 48" MH
DS MH N4669
STA 2+08±

PROTECT IN PLACE
EXIST 48" MH
STA 1+02.00

JOIN EXIST MH
STA 2+06±

JOIN EXIST MH

NEW VCP SEWER MAIN

EXIST CONCRETE SIDEWALK
(SEE NOTE NO. 6)

EXIST CURB AND GUTTER
(SEE NOTE NO. 5)

REMOVE AND REPLACE

EXIST LANDSCAPING IN KIND
9 EXIST
AC PAVEMENT 9
4 SEWER CONSTRUCTION NOTES:

REMOVE AND REPLACE INTERFERING PORTION OF EXISTING SEWER MAIN WITH NEW 8" EXTRA STRENGTH VCP SEWER MAIN IN SAME ALIGNMENT AND CONNECT TO EXISTING SEWER MAIN PER DETAIL 4 ON SHEET 13. 4 REMOVE AND REPLACE LATERAL CONNECTION WITH NEW 8" X 6" EXTRA STRENGTH VCP WYE AND REPAIR COUPLINGS.
5 INSTALL 1-SACK CEMENT SLURRY BACKFILL (100-E-100).7

REMOVE EXISTING CLEANOUT AND CONSTRUCT NEW CLEANOUT PER DETAIL 5 ON SHEET 13.
8 JOIN EXISTING MANHOLE PER DETAIL 3 ON SHEET 12.9
SCALE: HORIZ: 1"= 40' VERT: 1"= 4'
PROFILE DALEWOOD AVENUE (P1560)
125
130
135
140
145
150
155
125
130
135
140
145
150
155
0+60 1+00 2+00 3+00 4+00 4+40EXIST 48"X48" SHALLOW MHSTA 3+72±RIM 137.2±STA 1+01.00(INV 134.40±)STA 1+53±JOIN EXIST MH(INV 134.20±)STA 1+57±(INV 134.06±)STA 3+70±(INV 133.55±)52'± REMOVE
EXIST 8" CIP

REPLACE WITH
NEW 8"VCP

PROTECT IN PLACE
EXIST ENCASED 8" VCP
213± LF 8" VCP PIPE @ 0.24%

EXISTING SURFACE

OVER CL OF PIPE
6" W
18" SD
52± LF
8" CIP PIPE
@ 0.40%REMOVE EXIST CLEANOUTCONSTRUCT NEW CLEANOUTSTA 1+00.00RIM 136.1±EXIST 48"X48" SHALLOW MHSTA 1+55±RIM 136.3±SCALE: HORIZ: 1"= 40' VERT: 1"= 4' PROFILE MYRTLE STREET (P3009)
95 100
105
110
115
120
125
95 100
105
110
115
120
125
0+60 1+00 2+00 2+80EXIST 48" BRICK MHSTA 1+00.00RIM 114.8±EXIST 48" BRICK MHSTA 2+59±RIM 115.1±STA 1+02.00JOIN EXIST MH(INV 104.68±)STA 2+58±(INV 105.10±)30'± REMOVE EXIST 8" CIP
REPLACE WITH NEW 8" VCP

PROTECT IN PLACE
EXIST 8" VCP
STA 1+32±JOIN EXIST 8" VCP(INV 104.76±)156± LF 8" CIP/VCP PIPE @ 0.28%

EXISTING SURFACE

OVER CL OF PIPE
9'-0" X 6'-3" RCB SD
18" SD
TELE
4" W
4" G
ELEC
7 SCALE: HORIZ: 1"= 40' VERT: 1"= 4'
PROFILE IMPERIAL HWY @ BROOKSHIRE AVENUE (P4644)
80 85
90 95
100
105
110
80 85
90 95
100
105
110
0+60 1+00 2+00 2+40STA 1+02.00JOIN EXIST MH(INV 89.75±)STA 2+06±JOIN EXIST MH(INV 89.49±)EXIST 48" MHSTA 2+08±RIM 98.6±EXIST 48" MHSTA 1+00.00RIM 98.2±EXISTING SURFACE

OVER CL OF PIPE
104± LF 8" VCP PIPE @ 0.24%
REMOVE EXIST 8" VCP
REPLACE WITH NEW 8" VCP
ELEC6" W
21" SS
PLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24 SEWER IMPROVEMENT PLAN AND PROFILE

ALIWIN STREET
0 SCALE:
20' 40' 80'
1'' = 40'

FIRESTONE BLVD ALLEY

BROOKSHIRE AVENUE
NOTES TO CONTRACTOR:

1. CONTRACTOR SHALL FIELD VERIFY THE SIZE, MATERIAL,

HORIZONTAL, AND VERTICAL LOCATION OF ALL CONNECTION POINTS

AND ALL UTILITY CROSSINGS PRIOR TO ANY CONSTRUCTION
ACTIVITY.

2. CONTRACTOR SHALL MAINTAIN ACCESS TO PRIVATE DRIVEWAYS, DRIVEWAYS AND STREET INTERSECTIONS AT ALL TIMES.

3. CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES

NECESSARY TO PROTECT IN PLACE EXISTING UTILITIES AND THRUST BLOCKS.

5. FOR INSTALLATIONS IMPACTING THE EXISTING CURB AND GUTTER,

CONTRACTOR SHALL REMOVE AND REPLACE TO THE NEAREST
WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 1.

6. FOR INSTALLATIONS IMPACTING THE EXISTING CONCRETE SIDEWALK,

CONTRACTOR SHALL REMOVE AND REPLACE TO THE NEAREST
WEAKENED JOINT PER CITY OF DOWNEY STD. DWG. NO. 5.NNN

CUT AND REMOVE EXIST 8"/10" CIP/VCP SEWER
REPLACE WITH NEW 8"/10" VCP SEWER

SPOT REPAIR

PROTECT IN PLACE
EXIST 8"/10" VCP SEWER
JOIN EXIST 8"/10" VCP SEWER

WITH MANUFACTURER INSTALLED
TYPE 2 BAND SEAL AND/OR
TYPE 2 REPAIR COUPLING
JOIN EXIST 8"/10" VCP SEWER

WITH MANUFACTURER INSTALLED
TYPE 2 BAND SEAL AND/OR
TYPE 2 REPAIR COUPLING 72''SD72''SDOE OE OE OE
8''SS 8''SS 8''SS 8''SS

CONSTRUCT NEW BASE AND

PROVIDE SMOOTH TRANSITION

FROM INLET TO OUTLET

CUT AND REMOVE

EXIST PIPE

THROUGH MH AS REQUIRED
2'

PROTECT IN PLACE
EXIST 8" VCP SEWER
(TYP)SUVA ST48" MH STA 1+98.00
PER DTL 1 ON SHT 13
(127.75±)
INV
(127.76±)
INV
B
B
B
B
CC
AA

NEW CHANNEL

CEMENT MORTAR
OUTLET

EXISTING

EXISTING MANHOLE

SHELF TO REMAIN

HOUSE LATERAL

STOPPERHOUSE LATERAL

STOPPER
1/8 BEND

CHANNEL

EXISTING
INLET

EXISTING

EXISTING SHELF
OUTLET

EXISTING
INLET

EXISTING
D
D
D
D
D

HOLE WITH CEMENT MORTAR

TO FORM MINIMUM

CAREFULLY AND NEATLY

BREAK OUT BRICKS

CORE CUT HOLE OR

CONCRETE MANHOLE

EXISTING PRECAST

MANHOLE
BRICK

EXISTING
OUTLET

EXISTING

EXISTING SHELF

MANHOLE

CONCRETE

PRECAST

EXISTING

BRICK MANHOLE

EXISTING
INLET

EXISTING

CHANNEL

EXISTING

SECTIONAL PLAN OF BASE

SECTIONAL ELEVATION B-B

SECTIONAL ELEVATION C-C

SECTIONAL PLAN OF BASE

SECTIONAL ELEVATION A-A

CHANNEL BASE

3. HOUSE LATERAL NOTES:

1. 2.

4. 3.

2. 1.

NOTES:

OPENING OF OD + 2" (50 mm).

SECURELY FASTEN "D"x
1' (300 mm) STUB INTO
STUB
"D"x1' (300 mm)
6" (150 mm)
"D"x1' (300 mm)
STUB
INSTALL "D"x 6" (150 mm)

WYE OR TEE
6" (150 mm)
INSTALL "D"x 6" (150 mm)

WYE OR TEE
"D"x 1'
(300 mm)
STUB

STOPPER
1/2" (15 mm)NEWCHANNELNEWCHANNELEXISTING CONC
"D" SHALL BE 8" (200 mm) MINIMUM.

CEMENT MORTAR SHALL BE CLASS "D" CONFORMING TO SSPWC 201-5.

USE TYPE "D" OR "G" JOINTS CONFORMING TO SSPWC 208-2.

INVERT ELEVATION OF "D" x 1' (300 mm) STUB AT THE INSIDE FACE OF MANHOLE TO BE 0.10' (30 mm) HIGHER THAN EXISTING OUTLET INVERT ELEVATION.

THE CORE CUT HOLE SHALL BE MADE WITH EQUIPMENT SPECIALLY

DESIGNED TO CUT A SMOOTH HOLE WITHOUT SPALLING OR DAMAGE TO THE REINFORCING STEEL OR STRUCTURE.

WYE SHALL BE LAID WITH 1/8" (3 mm) RISE PER 1' (300 mm) AND 6" (150 mm) SPUR AT 45° FROM HORIZONTAL UNLESS OTHERWISE SHOWN ON THE PLANS.
"D" X 4" (100 mm) WYE OR TEE AND 4" (100 mm) HOUSE LATERAL MAY BE SUBSTITUTED FOR "D" x 6" (150 mm) WYE OR TEE AND 6" (150 mm) HOUSE LATERAL.

CHISEL OUT EXISTING

CONCRETE SHELF TO
FORM NEW CHANNEL.

SMOOTH CHANNEL
SURFACE WITH 1/2" (15
mm) CEMENT MORTAR

EXISTING
INLET
"D"x1'
(300 mm)
STUB

CORE CUT HOLE
DIA=OD+2"
(50 mm) MAX

CORE CUT HOLE
DIA=OD+2" (50
mm) MAX

SECURELY FASTEN
"D"x1' (300 mm) STUB

INTO CORED HOLE

WITH CEMENT MORTAR
INSTALL "D"x6"
(150 mm) WYE OR TEE

PROTECT IN PLACE
EXIST 48"X48" SHALLOW MH
4'4'0.5'0.5'
PROPOSED 8" VCP SEWER

JOIN EXIST MH

OE OE OE OE
8''SS 8''SS 8''SS 8''SS

CONSTRUCT NEW BASE AND

PROVIDE SMOOTH TRANSITION

FROM INLET TO OUTLET

CUT AND REMOVE

EXIST PIPE

THROUGH MH AS REQUIRED

PROTECT IN PLACE
EXIST 8" VCP SEWER
(TYP)SUVA ST48" MH STA 2+00.00
PER DTL 1 ON SHT 13
(127.47±)
INV
(127.48±)
INV
DEPTH AS SHOWN PER PLANS45.0°MAXNOTES:

1. CONTRACTOR SHALL VERIFY SIZE OF EXISTING LATERAL AND CONSTRUCT SAME SIZE LATERAL.

2. FOR APPROXIMATE LOCATION OF EXISTING LATERALS SEE PLAN.

3. CONTRACTOR SHALL INSTALL NECESSARY PIPING AND FITTINGS TO MAKE CONNECTION TO THE EXIST. LATERAL.

4. CONTRACTOR SHALL FIELD VERIFY THE DEPTH AND LOCATION OF THE EXIST. LATERAL PRIOR TO CONNECTION.

EXIST. VCP

SEWER LATERAL

CUT AND RECONNECT TO
EXIST. SEWER LATERAL WITH

BANDED RUBBER COUPLING

STAINLESS STEEL RINGS

PROPOSED VCP

SEWER LATERAL

BACKFILL PER
DTL 4 ON SHT 13
MIN. SLOPE = 1/4" PER FT. OR 2%

CONSTRUCT VCP

SEWER LATERAL

LENGTH AS REQUIRED
1/8 BEND

PROPOSED WYE

PROPOSED

VCP SEWER

REMOVE INTERFERING
PORTIONS OF EXIST. VCP

AS REQUIRED
PLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24 SEWER CONNECTION DETAILS
4 SPOT REPAIR CONNECTION DETAIL
SCALE: NTS
1 SUVA STREET WEST MANHOLE CONSTRUCTION DETAIL
SCALE: 1" = 5'
3 BREAKING INTO EXISTING MANHOLES
SCALE: NTS
5 CONNECTION TO EXISTING SHALLOW MANHOLE DETAIL
SCALE: NTS
2 SUVA STREET EAST MANHOLE CONSTRUCTION DETAIL
SCALE: 1" = 5'
NOTE:

1. THE CONTRACTOR SHALL VERIFY THE

LOCATION AND DEPTH OF CONNECTION

POINTS AND UTILITY CROSSINGS PRIOR

TO THE BEGINNING OF CONSTRUCTION
NOTE:

1. THE CONTRACTOR SHALL VERIFY THE

LOCATION AND DEPTH OF CONNECTION

POINTS AND UTILITY CROSSINGS PRIOR

TO THE BEGINNING OF CONSTRUCTION
(BROCK AVE)
(PARROT AVE)
(ORIZABA AVE)
(BROCK AVE)
6 SEWER LATERAL DETAIL
SCALE: NTSN N

CITY OF DOWNEY

SANITARY SEWER

TRENCH & PAVING
NOTES

1. PIPE BASE AND ZONE BACKFILL - 1/2" CRUSHED ROCK @ MIN. 90% RELATIVE COMPACTION. CERTIFICATION OF IMPORTED MATERIAL REQUIRED.

2. TRENCH ZONE BACKFILL - NATIVE MATERIAL OR IMPORTED SAND WITH MIN. SE OF 30 OR COEFFICIENT OF PERMEABILITY > 1.4 IN/HR @ MIN. 90% RELATIVE COMPACTION.

CERTIFICATION OF IMPORTED OR NATIVE MATERIAL REQUIRED.

3. FOR AREAS CURRENTLY PAVED, REPLACE AC PAVEMENT AND AGGREGATE BASE TO EXISTING CONDITIONS PLUS ONE INCH (P+1") AT MINIMUM 95% RELATIVE COMPACTION.

NEW AC PAVEMENT SHALL NOT BE LESS THAN EIGHT INCHES (8"). FOR AREAS NOT

CURRENTLY PAVED, SEE STREET IMPROVEMENT PLANS FOR PAVEMENT/BASE REQUIREMENTS. FOR OTHER PAVED AREAS, SEE NOTE 9.

4. FOR AREAS CURRENTLY PAVED, SURFACE COURSE SHALL BE C2-PG-64-10-R10 (1/2") WITH ASPHALT BINDER OF 5.5% TO 5.7% (MIN. THICKNESS = 2"). FOR AREAS NOT CURRENTLY PAVED, SEE STREET IMPROVEMENT PLANS.

5. FOR AREAS CURRENTLY PAVED, BASE COURSE SHALL BE B-PG-64-10-R10 (3/4") WITH ASPHALT BINDER OF 5.2% TO 5.4%. FOR AREAS NOT CURRENTLY PAVED, SEE STREET IMPROVEMENT PLANS.

6. PERMANENT PAVING SHALL BE COMPLETED WITHIN FIVE (5) DAYS AFTER EXCAVATION.

TEMPORARY PAVING SHALL BE TWO-INCH (2") MINIMUM HOT MIX.

7. FINAL SAWCUTS SHALL BE A MIN. 6-INCHES OUTSIDE LIMITS OF TRENCH WITH

EXCEPTIONS MADE FOR THE LOCATION OF JOINTS AND SCORE MARKS (SEE SPECIFICATIONS). CRACKED PAVEMENT ADJACENT TO TRENCH SHALL BE REMOVED AND REPLACED.

8. ALL EDGES OF EXISTING PAVEMENT BEING JOINED, SURFACE BEING OVERLAID, AND TRENCH PAVING CUT AREAS SHALL BE SEALED WITH SS 1-H ASPHALTIC EMULSION AT THE RATE OF 0.08 TO 0.10 GALLON PER SQUARE YARD, NOT SOONER THAN 24 HOURS AFTER PLACEMENT OF PAVEMENT.

9. WHERE PLANS SHOW PCC PAVEMENT SUBGRADE (IF ANY) WITH AC PAVEMENT

OVERLAY, PCC SECTION SHALL BE REPLACED TO EXISTING CONDITIONS PLUS ONE INCH (P+1"), WITH DOWELS AND EPOXY, AND NEW AC PAVEMENT TO MATCH EXISTING. 1/2" CRUSHED ROCK

BEDDING & BACKFILL
REQUIRED12"6"
MIN.
6"
MIN.

W
W+1'P+1"BPVARIES - REFER TO PLANS6"VERT. SCALE
HORIZ. SCALE

SHEETSSHEET
DWG. NO.

OF

UTILITIES DIVISION
- DEPT. OF PUBLIC WORKS - UTILITIES DIVISION
DESIGNED BY:

DRAWN BY:

CHECKED BY:

APPROVED BY:
1 1
5-S

PROPOSED PAVEMENT

INITIAL PAVEMENT CUT
NATIVE @ 90% RELATIVE COMPACTION

TRENCH ZONE

SANITARY SEWER PIPE

PER PLAN

PIPE ZONE
AGG. BASE @ 95%

RELATIVE COMPACTION

EXISTING BASE
DM
JO
DM
5/23
5/23
5/23

WATER TIGHT JOINTS
NOTES:7'- 0" MIN24"
2" AC PAVEMENT
8"
MIN.

TOP OF PAVEMENT

OF EXIST GRADE

ALL PRECAST MANHOLE
(GREENBOOK SECTION 215)

SECTIONS SHALL BE

MANUFACTURED IN

ACCORDANCE WITH

SPECIFICATIONS
6"
MIN

CONCRETE COLLAR AROUND
MANHOLE COVER FRAME.

CIRCULAR COLLAR IN PAVED

AREAS, MANHOLE SHALL BE

RAISED TO GRADE AND CONCRETE

COLLAR POURED AFTER FINAL
SURFACE COURSE IS PLACED.
(SEE NOTE NO 3)

EXIST AC PAVEMENT

EXIST AB
6" IN PAVED AREAS

WARNING SIGN
FRAME & COVER PER DTL 3

PRECAST

ECCENTRIC

CONCRETE CONE
ORIENT PER DTL 3
6"
MIN
48"MIN

POLYURETHANE
COATED
SEE NOTE 1
2" MINPIPE
O
D
9"4'- 0" MINVARIES AS NEEDED - PRECASTREINF CONCRETE SECTIONS24"13" MIN24" MAX 1/2" CEMENTMORTARPER DTL 2

1. A KNOCKOUT SHAFT SECTION MAY BE SUBSTITUTED FOR CAST IN PLACE BASE, IN WHICH CASE THE PRECAST UNIT SHALL CONFORM TO A.S.T.M. C-478.

2. FOR 24 INCH PIPE AND LARGER, THE TOP HALF OF THE PIPE SHALL BE REMOVED TO

THE CONTOUR OF THE INSIDE OF THE MANHOLE AND THE BROKEN EDGES PLASTERED SMOOTH WITH CEMENT MORTAR.

3. THE PCC COLLAR SHALL BE 2 INCHES FROM FINISH GRADE AND 3 INCHES BELOW THE RING AND CONE JOINT. THE MIX DESIGN SHALL BE 560-C-3250.

4. ALL MORTAR SHALL BE CLASS "B".

5. PLACE TWO HALF MOON SHAPED PLYWOOD COVERS ( 5/8" THICK MINIMUM ) IN

BOTTOM OF MANHOLE AFTER SHAFTS HAVE BEEN SET TO KEEP DEBRIS FROM ENTERING SEWER.

6. ALL INLETS AND OUTLETS SHALL BE SUPPORTED WITH CONCRETE SUPPORTS PRIOR TO POURING MANHOLE BASE.

BASE POURED

AGAINST

UNDISTURBED
SOIL. IF

DISTURBED OR

GROUND WATER,

CRUSHED ROCK

REQUIRED PER

SPECIFICATIONS MINPLAN
NOTES:

PLASTIC JOINT FLOWD
MH SHA
F
T
OPENIN
G

MH STATIONING

UNLESS OTHERWISE
NOTED

PIPE SHALL BE LAID

WITH END SQUARE INTO

MH BASE, UNLESS
OTHERWISE NOTED.

CONSTRUCT FILLET

SHELF OVER PIPE TO
DRAIN

FOR LOCATION OF MH

SHAFT OPENING
PER DTL 6
R = 2 X D

STUB (TYP)
8" MIN CONC ENCASE
(INCLUDING BELL)

JOINT SEALING

COMPOUND
8 "
M
INBASE
1-2' & 1-1' JOINTS AT BOTH

INLETS AND OUTLETS

1.PLASTIC JOINTS - PERFORMED COLD-APPLIED READY-TO-USE PLASTIC JOINT

SEALING COMPOUND SHALL BE QUICK-SEAL AS SUPPLIED BY QUIKSET UTILITY VAULTS, SANTA ANA, CALIFORNIA - OR APPROVED EQUAL. MUST BE USED WHEN GROUND WATER IS ENCOUNTERED. PRECAST JOINTS SHALL BE SEATED USING MASTIC.

DIRECTION OF

FLOW (TYP)

MH SHAFT

OPENING (TYP)

SOUTH BAY

FOUNDRY
SBF 1176
SIZE 24
32A
27B
24C
4D
4E
SIZE
24"
C E DB
A

1. MANHOLE FRAME AND COVER SHALL BE PER GREENBOOK SECTION 206-3.3.2.

2. 48" MANHOLES SHALL HAVE 24" COVERS.

SECTION A-A
A
A
SEWER
14 1/2" (368 mm)
13 1/2" (342 mm)
11 1/2" (292 mm)
17" (432 mm)
B B
A A
(10 mm)
10" (254 mm)
13" (330 mm)
3/8"
1" (25 mm)
4"
(100 mm) MIN
El E

UNDISTURBED EARTH
CAP
C C
45° ELL
8"
(200 mm) WYE
D D
8"
(200 mm)
SEWER

1. 2.

3. 4.

5. A. VC PIPE
B. PE PIPE
C. ABS SOLID WALL PIPE
D. ABS COMPOSITE PIPE
E. PVC PLASTIC PIPE
CAP

PIPE BELL

MORTAR, TYPE F
(25 mm)
1"3"(75 mm)7/8"(22 mm)1 3/8"(35 mm)ACCESS COVER 3"(76 mm)SECTION A-A ACCESS FRAME 11 3/4"(298 mm)5/8"(16 mm)7/8"(22 mm)1 1/4"1 1/2"(32 mm)(38 mm)SECTION B-B 13" MIN(325 mm)4" MIN(100 mm)(100 mm) 4" MIN
SECTION D-D 2" MIN(50 mm)D PER PLANS(300 mm)12" MIN18" MAX(450 mm)APPROX4" (100 mm)26"(650 mm) MINSECTION C-C 18" MIN
(450 mm)
PLAN
NOTES:

DETAIL A 1"(25 mm)VALUES OF DIMENSION D AND ELEVATION E SHALL BE AS SHOWN ON THE PLANS.

PIPE AND FITTINGS, UNLESS OTHERWISE NOTED, SHALL BE OF THE SAME MATERIALS AS THE SEWER, UNLESS APPROVED ADAPTORS ARE USED, AND MAY BE ANY OF THE FOLLOWING:

PIPE AND FITTINGS SHALL BE BEDDED AND ENCASED IN CONCRETE AS SHOWN. CONCRETE SHALL BE CLASS 450-C-2000 (265-C-14). JOIN AND ALIGN PIPE AND FITTINGS BEFORE PLACING CONCRETE.

MAINTAIN ALIGNMENT WHILE PLACING AND ALLOWING CONCRETE TO SET.

THE ACCESS FRAME, COVER AND CAP SHALL BE CAST IRON. FINGER HOLES MAY BE DRILLED OR BLOCKED OUT PRIOR TO CASTING. FINGER HOLES SHALL NOT BE PUNCHED OUT.

THE CONTRACTOR MAY PLACE EITHER CIRCULAR OR SQUARE CONCRETE PIPE WALL SUPPORTS.

RAISE LETTER
3/16" (5 mm)
24" MIN
(600 mm)
ACCESS CAP 11"
(275 mm) DIA x 1/2"
(15 mm) THICK w/
3/4" (20 mm)

FINGER HOLE

ACCESS FRAME
& COVER

CONSTRUCTION JOINT
8" (200 mm)SEWERSEE DETAIL A
SHEET 2
PLANS PREPARED BY:

DATER.C.E. NO. 55574
www.tetratech.com
17885 Von Karman Ave, Suite 500
Irvine, California, 92614
Phone: (949) 809-5000
Fax: (949) 809-5010
XX/XX/24 MISCELLANEOUS DETAILS
4 SANITARY SEWER TRENCH AND PAVING
SCALE: NTS
1 STANDARD 48" MANHOLE
SCALE: NTS
2 MANHOLE CONCRETE BASE
SCALE: NTS
6 SHAFT LOCATION DETAILS
SCALE: NTS
3 TRAFFIC MANHOLE FRAME & COVER
SCALE: NTS
5 TERMINAL CLEANOUT STRUCTURE
SCALE: NTS

Item Description UnitQty.AmountUnit Price AUnit PriceAmountUnit PriceAmountUnit Price mount 1 Remove and replace broken pipe with new 8-inch extra strength VCP sewer main and repair couplings.EA36 10,500.00 378,000.00$ $ 11,200.00 403,200.00$ 10,000.00$ 360,000.00$ 10,065.00$ 362,340.00$ $ 2 Remove and replace broken pipe with new 10-inch extra strength VCP sewer main and repair couplings.EA1 12,000.00 12,000.00$ $ 15,000.00 15,000.00$ 17,000.00$ 17,000.00$ 13,730.00$ 13,730.00$ $ 3 Remove and replace broken pipe with new 8-inch extra strength VCP sewer main, 8-inch x 6-inch extra strength VCP wye, and repair couplings. EA4 10,500.00 42,000.00$ $ 12,500.00 50,000.00$ 13,000.00$ 52,000.00$ 11,254.00$ 45,016.00$ $ 4 Remove and replace broken pipe with new 8-inch extra strength VCP sewer main and repair couplings at Location 5 (7180 Suva Street – Sheet 4).LS1 17,000.00 17,000.00$ $ 25,000.00 25,000.00$ 25,000.00$ 25,000.00$ 36,028.00$ 36,028.00$ $ 5 Remove and replace interfering portion of existing sewer main with new 8-inch extra strength VCP sewer main in same alignment and connect to existing sewer main at Firestone Boulevard and Myrtle Street (Sheet 11).LS1 18,000.00 18,000.00$ $ 32,000.00 32,000.00$ 22,000.00$ 22,000.00$ 32,653.00$ 32,653.00$ $ 6 Join existing sewer manhole and re-channelize base.EA6 1,500.00 9,000.00$ $ 3,000.00 18,000.00$ 4,000.00$ 24,000.00$ 3,682.00$ 22,092.00$ $ 7 Remove existing cleanout and construct new cleanout.EA1 10,000.00 10,000.00$ $ 4,500.00 4,500.00$ 2,500.00$ 2,500.00$ 13,769.00$ 13,769.00$ $ 8 Furnish and install new 48-inch Oldcastle precast sewer manhole with polypropylene steps, Lane Model P-14938.EA2 15,000.00 30,000.00$ $ 18,000.00 36,000.00$ 20,000.00$ 40,000.00$ 26,855.00$ 53,710.00$ $ 9 Remove and replace interfering portion of existing sewer main with new 8-inch extra strength VCP sewer main and fittings in same alignment and connect to existing sewer main.LF289 425.00 122,825.00$ $ 515.00 148,835.00$ 675.00$ 195,075.00$ 605.00$ 174,845.00$ $ 10 Furnish and install new 8-inch x 6-inch extra strength VCP wye and repair couplings and reconnect to existing sewer lateral.EA1 10,500.00 10,500.00$ $ 900.00 900.00$ 3,000.00$ 3,000.00$ 1,875.00$ 1,875.00$ $ 649,325.00$ 733,435.00 740,575.00$ 756,058.00$ $
Engineer's Estimate

CONTRACTOR TOTAL BASE BID
Torres Sanitation Systems Construction
Ramona Inc.

Williams Pipeline Contractors Inc.

GRBCON, INC.

Gentry General Engineering, Inc.

DIAMOND CONSTRUCTION & DESIGN
Dominguez General Engineering, Inc.

GCI Construction, Inc.

Big Ben Engineering
MMC Inc.

CEM Construction Corp
Sanitary Sewer Spot Repairs
New Sanitary Sewer Cleanout and Manholes
CAPITAL IMPROVEMENT PROJECT NO. 24-24
Citywide Sewer Improvements

BID SUMMARY
February 12, 2025
Torres Sanitation Systems Co.Ramona Inc.

Sanitary Sewer Vitrified Clay Pipe and Fittings
TOTAL BASE BID – Items 1 to 10
ALL BIDS RECEIVED:

Williams Pipeline Contractors Inc.GRBCON, INC.
598,000.00$
649,325.00$
733,435.00$
740,575.00$
756,058.00$
852,585.00$
990,540.00$
1,143,625.00$
1,285,900.00$
1,309,180.00$
1,376,200.00$
1,547,050.00$