Cities Index.
05. CIP No. 22-20 and 22-21 - Accept Work for Residential Streets Pavement Rehab-Area 5 & 7

Downey City Council
May 13, 2025

Document
05. CIP No. 22-20 and 22-21 - Accept Work for Residential Streets Pavement Rehab-Area 5 & 7
Meeting
May 13, 2025
Body
Downey City Council
Pages
5
Original file
17 KB
Text extracted from the city's file for reading and search. Open the original on lf.downeyca.org. That file is the official record.

TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: OFFICE OF THE CITY MANAGER
BY: MATTHEW BAUMGARDNER, P.E., DIRECTOR OF PUBLIC WORKS/

CITY ENGINEER
DATE: MAY 13, 2025
SUBJECT: ACCEPTANCE OF WORK FOR THE RESIDENTIAL STREETS PAVEMENT REHABILITATION - AREAS 5 AND 7, CAPITAL
IMPROVEMENT PROJECT (CIP) NO. 22-20 AND 22-21

EXECUTIVE SUMMARY
The City Council will consider accepting the work for the construction of the Residential Streets Pavement Rehabilitation - Area 5 and 7 Project (Project), Capital Improvement Project (CIP) No. 22-20 and 22-21. Further, the Council will consider approving Onyx Paving Company, Incorporated's final construction contract amount of $8,897,980, approving transfer of funds and authorizing the Director of Public Works/City Engineer to file a Notice of Completion with the Los Angeles County Recorder's office. The Residential Streets Pavement Rehabilitation - Area 5 and 7 Project has been completed in accordance with the approved plans and specifications, and staff recommends that the City Council accept the project as complete.

RECOMMENDATION
That the City Council:

Accept the work for the Residential Streets Pavement Rehabilitation - Area 5 and 7 Project, Capital Improvement Project (CIP) No. 22-20 and 22-21;

2. Approve Onyx Paving Company, Incorporated's final construction contract amount of $8,897,980; and,

3. Authorize the Director of Public Works/City Engineer to file a Notice of Completion for the project with the Los Angeles County Recorder's office, indicating the work is complete and has been accepted by the City.

On February 27, 2024, the City Council approved plans (Attachment A) and specifications for the Residential Streets Pavement Rehabilitation - Area 5 and 7, CIP No. 22-20 and 22-21, and granted authority to advertise for construction bids. On May 28, 2024, the City Council awarded a construction contract in the amount of $7,337,000 to Onyx Paving

CAPITAL IMPROVEMENT PROJECT NO. 22-20 AND 22-21 RESIDENTIAL STREETS PAVEMENT REHABILITATION PROJECT - AREAS 5 AND 7
MAY 13, 2025
PAGE 2
Company, Incorporated. On July 23, 2024, work commenced and was completed on March 31, 2025.

ANALYSIS
This project rehabilitated 277 residential street segments with a total length of approximately 72,148 linear feet or 13.66 miles of roadway in Area 5 and 7. The project also included the replacement of uplifted or damaged curb and gutter, sidewalk, and cross -gutter. In addition, the project included the replacement of curb access ramps in accordance with the latest Americans with Disabilities Act (ADA) requirements, and the replacement of incidental striping.

Combining the Area 5 and Area 7 Projects led to favorable bids due to the increased production that contractors would achieve by ordering and installing larger quantities of materials. This allowed staff the flexibility to look into additional improvements on the project. Staff approved six change orders in the amount of $1,980,160.Over 11,400 linear feet of curb and gutter were added to the project to improve drainage on various street segments, for a total of $1,118,655. The remaining change orders were for: the installation of six additional crosswalks and associated curb ramps and striping; additional asphalt concrete reconstruction to improve the grade at various cross -gutters; additional contractor move -in; and additional utility adjustments. The final construction contract amount was $8,897,980.

The Residential Streets Pavement Rehabilitation - Area 5 and 7 Project has been completed in accordance with the approved plans and specifications and staff recommends that the City Council accept the project as complete.

CITY COUNCIL PRIORITIES
Efficiency and Adaptability
Quality of Life, Safety & Infrastructure

FISCAL IMPACT
The final cost of the construction contract, including the original contract amount, net decrease in contract quantities and six change orders is $8,897,980. The total project cost is $9,806,133 broken down as follows:

Item
Amount
Construction Contract
$7,337,000
Net decrease in Contract Quantities
$419,180
Change Orders
$1,980,160
Final Construction Cost
$8,897,980
Design and Preliminary Engineering
$454,389
Construction Inspection and Materials Testing
$306,565

CAPITAL IMPROVEMENT PROJECT NO. 22-20 AND 22-21 RESIDENTIAL STREETS PAVEMENT REHABILITATION PROJECT - AREAS 5 AND 7
MAY 13, 2025
PAGE 3
Construction Engineering and Contract Administration $147,199 Total Final Project Cost: $9,806,133
Sufficient funding is available for this project as shown in the table below:

Account
No.

Funding Source
Amount
58-1-6876
Fund 58 (Measure M Bond)
$2,014,701
59-1-6876
Fund 59 (Measure R Bond)
$3,637,135
32-1-6877
Fund 32 (Senate Bill 1)
$500,000
38-1-6877
Fund 38 (Vehicle Impact Fee)
$2,230,000
56-1-6877
Fund 56 (Measure R Local Return)
$1,417,000
57-1-6877
Fund 57 (Measure M Local Return)
$1,235,000
58-1-6877
Fund 58 Measure M Bond
$180,528
Total Project Funding:
$11,214,364
Savings in the amount of $1,408,231 will be available for reprogramming.

ATTACHMENTS
Attachment A — Plans

jI l Iu;. .� ATTACHMENT A
J �J \� - rrc r.�e arcASSAIR
` — —10521 LA REAPA AID „ .re 'Al .
e 11
ecPr r.M_i J A06; to
AL
s I IVA wT�
n sXV
-- I3 Ai9F A_l 7 SLURRY REAL TYPE 11 CAR
A2. Oj_A20/ 771. 11 # MAPS 7r A03 kIA
- { _ 11 �Ix rA26 �) .-(£4 UERY 11 P
A03
1111 IT
It ; , yam)
r1LUXOR AT DO— AVE �AIOI) LUXOR ST RROCKEARE AVE FATTAN RD SLURRY REAL TYPE ff OVER �� y` Sf:HOf)I (A0E 3 y l3
JAEw PIRI ar
� us HIE ex nus cw
w
s
J $ _
A74�.

MI
$JI —_ —
wMILLER IT AVE a
t✓ `�_
La
3 11 z
IA10 11 UERY ( 09 11
H' Al2 x sT
R�
WARREN J` �.�'g� tz �`
HIGH iA04A7- _� {Ai6,
scRooL r / _ _VASLI AVE III GO:

IJ-ter]—�TUR EA
A�] a., .111E IT ff OVER
— — Al L'_ Ai3 $ �` A151 j Ai6 1 11
A08) _ �`.� J _ A161y
_ —`per � Ath 17
A14

IIU ETU
s
F.. �a r 11 —
DIG ALERT EDAN / /6/za STA n LULL o sw F r woes CITY OF DOWNEV OALIXI�A E oTE �a CITY DOV�/i�Y
N V ) soo-n22 ca33 ovt,l a 11!'fr DEPT. OF PUBLIC WORKS ENGINEERING DIVISION R w m CONSULTING C3ROUP CIP NO. 22-20
p a s. s��EvGROU�
ca 611114 * (vovlse4aJbe w.Rvn[3o�xao(Mscs)se*�� RESIDENTIAL STREET PAVEMENT REHABILITATION PROJECT EHeETAID 1oEA27sneers N0THI 0 DATE . DEDCRSPTION q M E 8 UMGA ONER P.E. ftCE ]f 932 DAiE AREA S O D
VH _L PAT OR OF' 111 WORKS 1/i2/24 "
111 11 M11 III HOTT:. REVISIONS Eo Aeosw INDEX SHEET Dwo_ No. 3—A 8""' 21 BNEET N0. STREET
FROM
TO
TIIE*TIERT
AOY/ L
o3
/ AM
AOS) �
rH sr
a5 reN auE
REAL r ouER 3/e AM
A03) LA kE1NA AVE
SfH Si
T0.52> LA REINA S1'
SLURRY SEAL fWE CAR 3/8" ARAM
AQl) 6f S
WSIERN 1/�
EW S1'
SLURRY SE fWE CAR 9/II ARAM
AOh) C E Si
H 00 SH F F
OOwNE AVF
St E OVE 3/L
A05 S
H OOASHi F F

R'C U E AVE
S 5t E VE 3/L'
Wc'S L UE S C
IS OK
F O S G O U S v REA­ l OVF 3/8' nRAM
_ 3 D 5
A05 `
QA E
G OF
All.—
0 OVE
ApE� 9 C A

OCE E D
A 0 TA
S S OVE /8
�

R ONF AVF
9RDE U
SIU S L VE /8 FlM
A06� 0 A

BFLI AVF
9RDE D
SIU SE OU^ /8 RAM
A06� eELOER DR

FARM ST
Ana AMorerra
LuaRr DEAL TIE (I OVER 3/a' ARAna
AB,;
(Da2J srAMPs RD
HURRY SAL „PE 11 CAR 3,
A01
r
snT sr
/ RAM
A08+ s
uNi e
oow�v AVE
/ ARAM
A08) 0 S
UO AVE
BR00 S RE S
S RR SE fWE CAR 9/8 ARAM
A09) G R d E

DE P A S
MAN fE S
S RR SE fWE CAR 9/II ARAM
A0� G LE. AVF
fEF ST
ARN Si
St E OVER 3/L' AR.nM
—Al 0 S

UO E AGE
R0. vE
S 5t E VE 3/L' AM
Aio D s s1'
uo e AVE
no. Vt
D ut` L
A10 U S Si'
UO AVE
RR00 Sw RF AVF
5 St E OVE 3/B" AM
Ai � TEXAS
UO f

00. A.

S 5 OVt /8 AM
�11 � D L F
CALL 0
R S
SI U SE L OU^ 3/8 M
...

Ata)
...
/ AM
%ts)
RE AVE
/ AM
A13�
/ ARAM
At)
AVEA
ARAM
AtA) I'0 T SJ
P 1'0 RU
8I26 FO i A S
SLURRY SCAL CAR 9/8 R
A15) VAffON RU

SE ARC &GRAY RD
CLE fA S1
S RR SEAL fWE CAR 9/II k
Ai� HE vE`
0 S
SUC FS Si
S 5t E VE 9/L 0 L ANU OVEK A�
A16) BE.. E
D S
CU. UE-SAC
C F O S C O U S SE F l OVER 3/8' nRAM
416 UE G AVEE
0 S
CU. UE -SAC

F O S C O
416) Fw00U NEW
( ) N CK FS Al
CLE A Al
S S: 'f t OVeR 3/B RAM
Ai] HUCN tS Si
SIAN D
IAItFtVJ00 BI..vD
S Nr S.AL 'f OVeR 3/8" NAM
Ai ]� RUC IES S

RFL M VF
5 D
SIU SE L OU^ 3/8 M
Ai8) EAVE
E
/... ARAM
nls) o
LE
wEs
sEu rwE o ov- / AM
0 LLMAN l<

EAST CUL-DE-SAC SAC
II
Ai9�A19)
dE AN All
Jf Si
CHERO LE At
SLURRY SCAL CAR 9/8' RAM
/� J1' S
W S1 CUL UE SAC
866 J 4 S1'
Al RECONSiRUC1'ION AID SLURRY SEAL )WE OVER 3/8" ARAM
A20 Si
fib /'H S'
LAk.. 000 BI..vD
S 5t L TYPE OVER 9/L" AR.nM
A21) G. Si
UOwNEv AVE
84�9 eiH AT
S UKRY StAL 'fWE OVER 9/L' ARnM
ATI) A. S
© 6YH S
RiRC UALE AVE
S 5t TYPE VE 3/8
A22) 6
N GiOAI.F F
IAItF 000 B vD
S SEAL 'f t OVt /B'
S
�(
S YR SE f Y 0 ER J/&" R
A22 VLL.AUST
DO NEr .AVF

GU DF S C
J
C RECONSTRUCTION .NJU SYURRY III ilP( II OVF 3/8 .M1RAM A23;
r
rR J
/ ` AM
�..
rN sJ
AM
A�5)
cc LC
/ RAM
Ai \
RD
/ ARAM
ARAM
Ala) LA kE1NA AVE

FIRESION
E11H

II' ARAM
Alt) ei'H Si
PARANOUN idLW
8142 ST
SLURR" SEAL fWE OVER 3/ II" ARAM
A25)
8 2 H S
ROwNE VF
S E E OVE 3/L M
Azt) F s
E 2
R H S
< FGD S � G
A26) F Si
S'

OR C DE SAG

F O S C O
9] ` n _

OIIN H N)
n An
n
lC 0 U S Rv EAM PE l OVf 3 8
Aix] H Si
I E A V;

ROWN,Y AVF
SI.U. $✓1L T E OU^R 3/8" AM

GENERAL NOTES
1, ALL WORK CALLED FOR ON THE PLANS SHALL COMPLY WITH THE CITY OF

DOW NEY STANDARD PLANS AND SPECIFICATIONS', THE LATEST EDITIONS OF THE STANDARD PLANS AND SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. "GREENBOOK", AND THE CALTRANS STANDARD PLANS AND SPECIFICATIONS,

2. LOCATIONS OF EXISTING UTILITIES AND/OR UNDERGROUND FACILITIES, IF

SHOWN, ARE IN THEIR APPROXIMATE LOCATIONS BASED ON BEST AVAILABLE INFORMATION AT TIME OF PREPARING PLANS. ACTUAL LOCATION, SIZE, TYPE,

AND NUMBER OF UTILITIES AND/OR UNDERGROUND FACILITIES MAY DIFFER

FROM THAT SHOWN AND SUCH UTILITIES OR FACILITIES MAYBE PRESENT THAT

ARE NOT SHOWN, IT IS THE CONTRACTOR'S RESPONSIBILITY TO HAVE SITE

INSPECTED BY USA PRIOR TO COMMENCING WORK AND TO VERIFY LOCATIONS

OF ALL UTILITIES WITH RESPECTIVE OWNERS PRIOR TO STARTING WORK AND

THROUGHOUT CONTRACT, THE PLANS ONLY SHOW KNOWN UNDERGROUND UTILITIES FOR STREETS THAT ARE TO BE RECONSTRUCTED.
3, THE CONTRACTOR SHALL NOTIFY THE CITY OF DOWNEY INSPECTOR AT LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION (PHONE 562-904-]110),
4, INSPECTION BY THE CITY OR ITS REPRESENTATIVE OF THE WORK CALLED FOR

ON THE PLANS DOES NOT, IN ANY WAS, RELIEVE THE CONTRACTOR OF THEIR

OBLIGATION TO PERFORM WORK IN COMPLIANCE WITH THE PLANS AND SPECIFICATIONS.
5, THE CONTRACTOR SHALL USE PROPER SAFETY SIGNING AND BARRICADING AS

REQUIRED PER CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (CA MOTOR), LATEST EDITION,
6, REQUESTS FOR DEVIATIONS FROM THE APPROVED PLANS(EXCEPT MINOR

ADJUSTMENTS IN THE FIELD TO MEET EXISTING CONDITIONS), SHALL BE MADE IN

WRITING AND ARE NOT TO BE INITIATED UNLESS, OR UNTIL, THEY ARE APPROVED

BOTH PUBLIC WORKS DIRECTOR CITY ENGINEER OR A REPRESENTATIVE ACTING SPECIFICALLY UPON HIS INSTRUCTIONS.
]. QUANTITIES, AS SHOWN ON THE PLANS ARE ESTIMATED, AND THE CONTRACTOR

IS ADVISED THAT FINAL OUANTITIES OF MATERIAL AND WORK IN PLACE MAYBE

MORE OR LESS THAN THOSE INDICATED ON THE PLANS,
8, CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL

REPORT ALL DISCREPANCIES TO THE CITY ENGINEER PRIOR TO THE COMMENCEMENT OF WORK.
9, AT NO TIME IS ANY BUSINESS OR RESIDENCE TO BE WITHOUT ACCESS UNLESS

OTHERWISE APPROVED IN WRITING BY THE CITY,

10. WORK LIMITED BETWEEN B 00 A.M.AND 5,00 P.M., UNLESS OTHERWISE APPROVED

BY THE CITY,
11, NO STORAGE OF MATERIALS/EQU IPM ENT WILL BE ALLOWED IN PUBLIC RIGHT OF -WAY. PROVIDE OFFEITE/ONSITE STAGINGISTORAGE AREA IF

NECESSARY,
12, TRAFFIC CONTROL SHALL BE PER CA MI OR WORK AREA TRAFFIC CONTROL

HANDBOOK (WATCH),
13, PEDESTRIAN ACCESS ALONG PARKWAY MUST BE MAINTAINED AT ALL TIMES. 14, THE CONTRACTOR SHALL OPERATE INA MANNER COMPLIANT WITH ALL

APPLICABLE SECTIONS OF THE DOWNEY MUNICIPAL CODE AND COMPLIANT WITH ALL APPLICABLE CITY COUNCIL RESOLUTIONS.
15, HARD HATS AND SAFETY VESTS SHALL BE WORN AT ALL TIMES WHEN WORKING

ON THIS PROJECT,

16. CONTRACTOR AGREES THAT THEY SHALL ASSUME SOLE AND COMPLETE

RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF THE CONSTRUCTION OF THIS PROJECT. INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THAT THIS REQUIREMENT SHALL APPLY AND NOT BE LIMITED TO

NORMAL WORKING HOURS', AND THAT THE CONTRACTOR SHALL DEFEND,

CONTINUOUSLY INDEMNIFY AND HOLD THE CITY AND ITS EMPLOYEES HARMLESS

FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE

PERFORMANCE OF THE WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY

ARISING FROM SOLE NEGLIGENCE OF THE CITY OR ITS EMPLOYEES, 17 RECOVER CENTERLINE MONUMENTS AND SET TIES PRE- CONSTRUCTIONAND

FILE PER COUNTY REQUIREMENTS, POST CONSTRUCTION SET NEW CENTERLINE MONUMENTS 8 TIES (INCLUDING MISSING MONUMENTS) PER CITY AND COUNTY REQUIREMENTS, AND FILE CORNER RECORDS.

18. REPLACE TYPE C BLUE RETROREFLECTIVE MARKERS WHERE A FIRE HYDRANT IS LOCATED.

UNDERGROUND STRUCTURES

ALL UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER

OR OTHERS AND THOSE SHOWN ON THE RECORDS EXAMINED ARE INDICATED WITH THEIR APPROXIMATE LOCATION AND EXTENT. THE OWNER BY

ACCEPTING THESE PLANS OR PROCEEDING WITH IMPROVEMENTS PURSUANT

THERETO AGREES TO ASSUME LIABILITY AND TO HOLD UNDERSIGNED

HARMLESS FOR ANY DAMAGES RESULTING FROM THE EXISTENCE OF

UNDERGROUND UTILITIES OR STRUCTURES NOT REPORTED TO THE

UNDERSIGNED, NOT INDICATED ON THE PUBLIC RECORDS EXAMINED,

LOCATED AT VARIANCE WITH THAT REPORTED OR SHOWN ON RECORDS

EXAMINED,

THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES

TO PROTECT THE UTILITIES OR STRUCTURES SHOWN AND ANY OTHER

UTILITIES OR STRUCTURES FOUND AT THE SITE, IT SHALL BE THE

CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURES CONCERNED BEFORE STARTING WORK.
frMl �y Or-sk-1 ]DOWNE T
31PUB�J10 WIDER��8 DEPARLERVIERMI VO

CONSTRUCTION PLANS FOR
CAPITAL IMPROVEMENT PROJECT NO. 22-21

RESIDENTIAL STREET PAVEMENT
REHABILITATION PROJECT AREA 7

VICINOITOSCALE Y MAP JUU
_ X WILllAMS
%
�' —' SCHOOL J
- GRIND AND OVERLAY MxMtaL Ro
r7/;�] RECONSTRUCT
. _ TEMPLE PARK..... Y �Ll
SUIDDLER sT R
wwr
o SCHOOL 8
'^ ( OLD RNER mao.'rx n C
A.EME'NTARY
SCHOOL
L
8 I OS AMIGOS RurvoR.I. sT
C�0UNTRY CLUB vA ' GOLiCOURSE.
ce[f S.
` LOS PADRNOS E § Y
a mnirvctR Sf
JUVENILE HALL o N. 51 R d £ o
p a tmevp n
i
auu nR � alm. m
S EVDnsT n is SENIORS
_ K CENTER
\v^\A g
AT D G APou n 4
2 RANCHO mP6 N
I..H SIITA�S PARK
M rmlus,,,IT

CONSTRUCTION NOTES
© PROTECT IN PEACE.

CGSE�T PP.GcATGAN.EGP_.AA OR A.S. IRE PER PLAIN .

T.

O PE OWE TSC SCHOOL CROSSWALK) TRUNCATED DOMES,
Q 2 TOPE PER PLAIN
BREMOIERDSTDROE A NEW PCC pftNEwAV PER
O SAACE'T"ALRNP,cSTp PEAK tt B 2. SIOEWALKWIDTH TOMATIC E%IST CONSTRUCT ""
'URI

O SAGOTTEN

TTER HEIGHT AND
WICTH TO MAT. EXIETO CONSTRUCT NEW NEW PCCRURB
© RAGEORBATEGBASE RUCT FULL DEPTH AC ON

SCAN'DEGOADD
CA
Q BA
IFY
® 0o
. ucT
FILL DEPTH Al IN THE MCARIFIED ADD RECOMPAITED BASE o
c'.GNTAPER
o D 11H

AVALVEROVERGUAT
A
0 A
iQ3 C

Q CONSTRUCT
Q 5OF ADDAEXISTOA R-1-PER GPPVAG DEAN 110-3 wITSTD PEAK 1363TYPE A2.

CONST
Q c R`SE(Rl-111 TYPICAL SECTION.

C"IFQ CONSTRU RSPPWC BTD PLAN 110 1, TYPE PER PLAN.
cT GENERAL NOTES PE
I EXISTING FAIII. TIRE IMPROVEMENTS, LANDSCAPING ETCCETHGT�-MEPNOT REMOVED AND REINSTALLED �ER WORK S COMPLETED
BE T

ME 'LES IS
INS
4, CA='TOMPR=SH&L BE SAGICUT WHEN REMOVED AND

RECONSTRUCTED
Q Iry . TICPNNT.

INSTALL 1 TWIDE WITTE BASIC CROSSWALK WITH I3 WIDE STRIPES PER © INS WALK WITH 12C WIDE STRIPES EVERY
© IN
0 IN
QE IN OOLxING PAVEMENT MARKING WORDS PER CALTRANS
SHE

PPAR NOG
O NSTALL rvO LEFT TURN PAVEMENT MARKING PER CALTRANGSTS PUw AMD Pury 141
o
PE (L)ARRowN Eft cuTRANB 5iC PLAN A1ae.
�i m
PE nI III AS PER
NOW
TYKE TD 1-1 n24A.

Q INSTALL
SIGN_ TYPE�GEND ory PLAN_
RECA�RNBTRDDTIDry
OD
o=
MD
COLD
— cLL FUPAwry
SEIR
_

CURB ANC GUTTER REPAIR

RIOGNIA' REPAIR
OCR
— ES GUTTER REPAIR
IBFEEAft
FEERT LEGENDS FLOINE LSuftFACE

← All documents from this meeting