08. Authorization to Solit Bids for the Downey Grammar School Arch Repair Project

Downey City Council
August 26, 2025

Document
08. Authorization to Solit Bids for the Downey Grammar School Arch Repair Project
Meeting
August 26, 2025
Body
Downey City Council
Pages
11
Original file
23 KB
Text extracted from the city's file for reading and search. Open the original on lf.downeyca.org. That file is the official record.

Item No.

TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

FROM: OFFICE OF THE CITY MANAGER
BY: MATTHEW BAUMGARDNER, DIRECTOR OF PUBLIC WORKS/CITY

ENGINEER

DATE: AUGUST 26, 2025

SUBJECT: AUTHORIZATION TO SOLICIT CONSTRUCTION BIDS FOR THE

DOWNEY GRAMMAR SCHOOL ARCH REPAIR PROJECT

EXECUTIVE SUMMARY

The City Council will consider authorizing the solicitation of construction bids for the Downey Grammar School Arch Repair Project. The proposed project will complete concrete repairs to the Downey Grammar School Arch located on Civic Center Drive between Brookshire Avenue and 3rd Street. The project also includes the installation of a roof structure to protect the Arch from further weathering.

RECOMMENDATION

That the City Council:

Approve the plans and specifications, and authorize the solicitation of construction bids, for the Downey Grammar School Arch Repair Project.

BACKGROUND
As part of a broader initiative to preserve Downey’s historic resources, the City of Downey retained Architectural Resources Group, Inc. (ARG) to conduct a condition assessment and provide treatment recommendations for the historic Grammar School Arch (Arch) located on Civic Center Drive. Originally constructed in 1916, the Arch served as the main entrance to the former Downey Grammar School at 8425 Second Street. The school was designed by prominent architect John C. Austin, known for designing the Los Angeles City Hall and the Griffith Park Observatory. After the City of Downey was incorporated in 1957, the building transitioned into serving as the first City Hall. In 1984, the Arch was relocated to its current location behind the new City Hall and was restored based on a schematic design by architect Martin Weil. Restoration at that time included setting the arch on a two- to three-foot foundation, repainting, re-stuccoing, and inserting iron beams for structural stability. Though plans for a red-tile roof were included in the initial restoration effort, the roof was never installed or was subsequently removed. A bronze donor plaque was also added to the interior wall of the arch.

AUTHORIZE THE SOLICITATION OF CONSTRUCTION BIDS FOR THE DOWNEY GRAMMAR SCHOOL

ARCH REPAIR PROJECT
AUGUST 26, 2025
PAGE 2

ARG conducted a non-destructive visual survey on November 5, 2024, inspecting the structure from the ground and via ladder, and supplemented this assessment with client- provided photographs from October 2024. Using a sounding hammer, ARG tested accessible stucco surfaces to identify areas of delamination, cracks, spalling, and paint failure. Based on this survey, ARG developed treatment recommendations aligned with the Secretary of the Interior’s Standards for the Treatment of Historic Properties and the American Institute for Conservation’s Code of Ethics. These recommendations emphasize the importance of preserving the Arch’s original materials and form wherever possible. The Standards for Preservation advise retaining historic fabric, while the Standards for Rehabilitation allow for greater flexibility in replacing significantly deteriorated or missing features.

Due to the historical significance of the Grammar School Arch, City staff from the Community Development Department (CDD) has kept the Downey Conservancy informed of their efforts regarding the Grammar School Arch. The Conservancy has expressed its appreciation and support for staff’s commitment to restoring the Arch in accordance with recognized historic preservation standards.

ANALYSIS

CD and Public Work have closely coordinated to develop the bid documents, and plans and specifications for the Downey Grammar School Arch Repair Project on Civic Center Drive. Design drawings have been developed to preserve this historic 1916 arch while correcting long-standing deterioration. The design work was completed through the consultant contract for the General Plan update.

Work will begin with gentle, low-pressure washing of all concrete and stucco surfaces to remove loose material before any repairs or coatings are applied. After cleaning, the crew will sound the façade, which is a process of assessing stucco for poorly-adhered material by tapping and listening for any hollow sounds. After this is complete, the crew will rout and patch cracks, excise unsound stucco or prior non-compatible patches, and replace spalled areas with a cementitious repair mortar; where reinforcement is badly corroded, it will be cut out and replaced with new stainless-steel bars to extend service life. Once the substrate is restored, the entire arch will be primed and painted to match its historic finish. The temporary plywood roof will be removed and a new roofing assembly will be installed to protect from further weathering. All work will follow the mock-up and review procedures required for historic resources.

Construction is scheduled to begin in October 2025, with completion anticipated by December 2025.

This Project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under Section 15301(c), Existing Facilities.

AUTHORIZE THE SOLICITATION OF CONSTRUCTION BIDS FOR THE DOWNEY GRAMMAR SCHOOL

ARCH REPAIR PROJECT
AUGUST 26, 2025
PAGE 3

CITY COUNCIL PRIORITIES

Quality of Life, Safety and Infrastructure

FISCAL IMPACT

There is no fiscal impact associated with the authorization to solicit bids for the project.

Historical restoration work is less common and more difficult to estimate. However, staff assumes this work will require a minimum of $100,000 for specialty contractors and inspectors to complete the restoration. A request to appropriate funds will be presented to Council to complete the project when staff returns for consideration of the contract award.

ATTACHMENTS

Attachment A: Project Location Map

ATTACHMENT A – PROJECT LOCATION MAP

T1.00COVER SHEETT1.01ABBREVIATIONS, GENERAL NOTES, PROJECT DATA, AND SYMBOLSA1.00PLANA1.10EXISTING AND PROPOSED ROOF PLANA2.00ELEVATIONSA8.00DETAILSA8.10ROOF DETAILSPROJECT TEAMVICINITY MAPPROJECT LOCATIONNTSOWNERCITY OF DOWNEY11111 BROOKSHIRE AVENUEDOWNEY, CA 90241CLIENTMIG, INC.537 S. RAYMOND AVEPASADENA, CA 91150ARCHITECTARCHITECTURAL RESOURCES GROUP, INC.360 E. 2ND STREETSUITE 225LOS ANGELES, CA 90012DOWNEY GRAMMAR SCHOOLARCH REPAIRCIVIC CENTER DRIVEDOWNEY, CALIFORNIABID SETJULY 22, 2025PROJECT LOCATIONHISTORIC SIGNIFICANCETHE DOWNEY GRAMMAR SCHOOL ARCH WAS CONSTRUCTED IN 1916 ANDWAS ORIGINALLY PART OF THE FORMER DOWNEY GRAMMAR SCHOOLBUILDING. THE BUILDING WAS DESIGNED BY ARCHITECT JOHN C. AUSTIN,WHO ALSO DESIGNED THE LOS ANGELES CITY HALL AND GRIFFITH PARKOBSERVATORY.INDEX OF DRAWINGSPROJECT DESCRIPTIONTHE PROJECT SCOPE OF WORK INCLUDES NEW ROOF, CONCRETE AND STUCCO REPAIR,AND PAINTING OF AN EXISTING ARCH IN THE CITY OF DOWNEY. THE ARCH WAS RELOCATEDFROM ITS ORIGINAL LOCATION, AND IS CONSIDERED A HISTORIC RESOURCE. GREAT CARESHOULD BE TAKEN DURING ITS REPAIR, AND MOCKUPS SHOULD BE UNDERTAKEN ASOUTLINED IN THE SPECIFICATIONS FOR HISTORIC ARCHITECT REVIEW.PROJECT LOCATION3RD STREETB R
O
O
K
S
H
I
R
E

A
V
E
D
O
W
N
E
Y

A
V
E
5TH STREETCI
V
I
C

CENTERDRARCHITECTURAL RESOURCES GROUP
SHEET TITLEREVISIONSDESCRIPTIONDATEISSUANCEPROJ NO.DRAWNCHECKEDDRAWING NO.DOWNEYGRAMMARSCHOOLARCH REPAIRBID SETJuly 22, 20252404251CIVIC CENTER DRIVE,DOWNEY, CA, 90241T1.00COVER SHEETMP / BTMP / SD / LKM / LY

PROJECT DATAARCHITECTURAL RESOURCES GROUP ASSUMES NO RESPONSIBILITY FOR THE MANAGEMENT OF HAZARDOUS MATERIALS THAT MAYBE ON THIS SITE.A.THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSURING THAT PERSONNEL WITHIN THE WORK AREA ARE PROTECTED FROMEXPOSURE TO ANY HAZARDOUS MATERIALS ENCOUNTERED. IF MATERIALS ARE DISCOVERED THAT MAY BE HAZARDOUS. THECONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND CEASE WORK UNTIL CONDITIONS CAN BE MAINTAINED INCOMPLIANCE WITH ALL APPLICABLE REGULATIONS.HAZARDOUS MATERIALSGENERAL NOTESWHEN MORE THAN ONE BLOCK ISUSED FOR A SINGLE DETAIL,THE NUMBER OF THE LOWESTNUMBERED BLOCK IS USED, THUSNUMBERS ARE ALWAYS IN THESAME LOCATION ON THE SHEET.THE NUMBERING SYSTEM USEDFOR DETAILS ON THE DRAWINGSIS AS SHOWN IN THE FOLLOWINGDIAGRAM.101178451212963DETAIL NUMBERING1.CONTRACTOR SHALL VERIFY THAT (E) CONDITIONS ARE AS INDICATED ON THE DRAWINGS. NOTIFY THE ARCHITECT IMMEDIATELYOF VARIATIONS OR DISCREPANCIES. DO NOT PROCEED WITH AFFECTED WORK UNTIL THE VARIATIONS OR DISCREPANCIES ARERESOLVED BY THE ARCHITECT.2.ALL CONSTRUCTION AND INSTALLATION WORK SHOWN ON DRAWINGS SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLECODES AND ORDINANCES. USE METHODS AS REQUIRED TO COMPLETE WORK WITHIN LIMITATIONS OF ALL PREVAILING LAWS ANDCODES.3.DO NOT SCALE DRAWINGS: USE DIMENSIONS SHOWN. ALL DIMENSIONS SHALL BE VERIFIED IN THE FIELD. DIMENSIONS SHOWN AT(E) CONDITIONS ARE TO FACE OF (E) FINISH. U.O.N. DIMENSIONS AT NEW WORK ARE TO FACE OF FRAMING, U.O.N. DIMENSIONS OF(E) CONDITIONS ARE FOR REFERENCE ONLY AND SHALL BE VERIFIED BY THE CONTRACTOR IN THE FIELD. WHERE NO DIMENSION ISPROVIDED CONSULT WITH THE ARCHITECT FOR CLARIFICATION BEFORE PROCEEDING WITH AFFECTED WORK.4.SAFETY MEASURES: AT ALL TIMES THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE CONDITIONS AT THE JOB SITE,INCLUDING SAFETY OF PEOPLE AND PROPERTY. ARCHITECT SITE VISITS ARE NOT INTENDED TO REVIEW THE ADEQUACY OF THECONTRACTOR'S SAFETY MEASURES.5.INSTALL MANUFACTURED MATERIALS AND EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS, UNLESSOTHERWISE INSTRUCTED.6.ALL WASTE AND REFUSE CAUSED IN CONNECTION WITH THE WORK SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF BYTHE CONTRACTOR. THE PREMISES SHALL BE LEFT CLEAR AND CLEAN TO THE SATISFACTION OF THE ARCHITECT.7.APPLICATION OF FINISH: SURFACES PREVIOUSLY PREPARED OR INSTALLED BY ANOTHER TRADE SHALL BE INSPECTED CAREFULLYBY THE CONTRACTOR BEFORE APPLYING SUBSEQUENT MATERIALS OR FINISHES. IF SURFACES ARE NOT ACCEPTABLE, THEARCHITECT SHALL BE NOTIFIED IMMEDIATELY IN ORDER THAT CORRECTIONS MAY BE MADE. APPLICATIONS OF FINISHES WILL BECONSTRUED AS ACCEPTANCE OF RESPONSIBILITY BY THE SUBCONTRACTOR FOR THE BASE UPON WHICH IT IS APPLIED.8.INSTALL ALL WORK PLUMB, LEVEL AND STRAIGHT, OR AS REQUIRED TO ALIGN WITH (E) ADJACENT SURFACES.9.CONTRACTOR SHALL DESIGN AND INSTALL SHORING AS REQUIRED TO PERFORM WORK. RESPONSIBILITY FOR ENGINEERING,CONSTRUCTION, AND SAFETY OF THE SHORING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.10.REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BECOMPLEMENTARY. CONFLICTS BETWEEN VARIOUS ELEMENTS OF THE DRAWINGS, SPECIFICATIONS, NOTES AND DETAILS SHALL BEBROUGHT TO THE ATTENTION OF THE ARCHITECT AND RESOLVED BEFORE PROCEEDING WITH WORK.11.DETAILS SHOWN SHALL BE INCORPORATED INTO THE PROJECT AT ALL APPROPRIATE LOCATIONS WHETHER SPECIFICALLY CALLEDOUT OR NOT.12.THE CONTRACTOR MUST SUBMIT IN WRITING ANY REQUESTS FOR MODIFICATIONS TO THE PLANS AND SPECIFICATIONS. SHOPDRAWINGS SUBMITTED TO THE ARCHITECT FOR REVIEW DO NOT CONSTITUTE "IN WRITING" UNLESS IT IS CLEARLY NOTED ON THESUBMITTAL THAT SPECIFIC CHANGES ARE BEING REQUESTED WITH THE PHRASE "REQUESTED CHANGE".13.FINAL AS-BUILT RECORD DOCUMENTS SHOWING ALL REVISIONS INCORPORATED DURING CONSTRUCTION SHALL BE SUBMITTED TOTHE ARCHITECT PRIOR TO PROJECT CLOSE-OUT.14.THROUGHOUT THE CONSTRUCTION DOCUMENTS, ITEMS THAT ARE EXISTING ARE INDICATED AS "EXISTING" OR "(E)", ITEMSWITHOUT THIS INDICATION ARE NEW CONSTRUCTION. WHERE REQUIRED FOR PURPOSES OF CLARITY, SOME ITEMS MAY BEINDICATED AS "NEW OR "(N)".15.CONTRACTOR SHALL MITIGATE ANY WATERPROOFING MATERIAL APPLICATION FUMES INTO THE AIR INTAKES TO PREVENT ANYADVERSE IMPACTS TO OFFICE BUILDING INDOOR AIR QUALITY.ABBREVIATIONS2A8.1SYMBOL LEGEND1A3.1KEY NOTENUMBERELEVATION ORPHOTO DETAIL SYMBOLELEVATION OR PHOTODETAIL NUMBERSHEET WHERE ELEVATIONOR PHOTO DETAILOCCURS20DETAIL NUMBERSHEET WHERE DETAILOCCURSKEY NOTE SYMBOLDETAIL SYMBOL&AND∠ANGLE@AT℄CENTERLINE∅DIAMETER/ ROUND#POUND OR NUMBERPERPENDICULARACOUSACOUSTICALACTACOUSTIC CEILINGTILEADAREA DRAINADJADJUSTABLE/ADJACENTAFFABOVE FINISHEDFLOORALALUMINUMAPPROXAPPROXIMATEARCHARCHITECTURALASBASBESTOSASPHASPHALTATTATTACHBDBOARDBITUMBITUMINOUSBLDGBUILDINGBLKBLOCKBMBEAMBOTBOTTOMBURBUILT-UP ROOFINGCABCABINETCBCATCH BASINCEMCEMENTCERCERAMICCGCORNER GUARDCICAST IRONCJCONTROL JOINTCLGCEILINGCLKGCAULKINGCLOCLOSETCLRCLEARCMUCONCRETEMASONRY UNITCNTRCOUNTERCOCLEANOUT ORCONTRACTINGOFFICERCOLCOLUMNCOMPCOMPOSITIONCONCCONCRETECONDCONDITIONCONNCONNECTIONCONSTRCONSTRUCTIONCONTCONTINUOUSCONTRCONTRACTORCORCONTRACTINGOFFICER'SREPRESENTATIVECORRCORRIDORCPTCARPETCTCERAMIC TILECTGCENTERCTSKCOUNTERSINKDBLDOUBLEDEMODEMOLITIONDEPTDEPARTMENTDETDETAILDETERDETERIORATEDDFDRINKING FOUNTAINOR DOUGLAS FIRDIADIAMETERDIMDIMENSIONDISPDISPENSERDNDOWNDODOOR OPENINGDRDOORDSDOWNSPOUTDSPDRY STANDPIPEDTLDETAILDWGDRAWINGDWRDRAWEREEAST(E)EXISTINGEAEACHEJEXPANSION JOINTELELEVATIONELECELECTRICALELEVELEVATOREMEREMERGENCYENCLENCLOSUREEPELECTRICAL PANELEQEQUALEQPTEQUIPMENTEWCELECTRICAL WATERCOOLEREXISTEXISTINGEXPEXPANSIONEXPOEXPOSEDEXTEXTERIORFAFIRE ALARMFBFUSE BOXFBR BDFIBER BOARDFBRGLFIBERGLASSFDFLOOR DRAINFDNFOUNDATIONFEFIRE EXTINGUISHERFECFE CABINETFHCFIRE HOSE CABINETFINFINISHFLRFLOORFLASHFLASHINGFLUORFLUORESCENTFNDFOUNDATIONFOFACE OFFOCFACE OF CONCRETEFOFFACE OF FINISHFOMFACE OF MASONRYFOSFACE OF STUDFOWFACE OF WALLFPFABRIC PANELFPRFFIREPROOFFRPFIBERGLASSREINFORCED PANELFSFULL SIZEFTFOOT OR FEETFTGFOOTINGFURRFURRINGFUTFUTUREGAGAUGEGALVGALVANIZEDGBGRAB BARGLGLASSGLBGLUE LAM BEAMGNDGROUNDGRGRADEGSMGALVANIZED SHEETMETALGYPGYPSUMHBHOSE BIBHCHOLLOW COREHDRHEADERHDWDHARDWOODHDWEHARDWAREHGTHEIGHTHMHOLLOW METALHORIZHORIZONTALHRHOURIDINSIDE DIAMETERINSULINSULATIONINTINTERIORJANJANITORJCJANITOR CLOSETJTJOINTKITKITCHENLABLABORATORYLAMLAMINATELAVLAVATORYLBPOUNDLKRLOCKERLNLINOLEUMLTLIGHTMAXMAXIMUMMBMACHINE BOLTMCMEDICINE CABINETMDFMEDIUM DENSITYFIBERBOARDMDOMEDIUM DENSITYOVERLAYMECHMECHANICALMEMBMEMBRANEMETMETALMFRMANUFACTURERMHMANHOLEMINMINIMUMMIRMIRRORMISCMISCELLANEOUSMOMASONRY OPENINGMTDMOUNTEDMULMULLIONNNORTH(N)NEWNICNOT IN CONTRACTNOMNOMINALNTSNOT TO SCALEOAOVERALLOBSOBSCUREOCON CENTEROCCOCCUPANCY OROCCUPANT(S)ODOUTSIDE DIAMETEROFCIOWNER FURNISHED,CONTRACTORINSTALLEDOFOIOWNER FURNISHED,OWNER INSTALLEDOFFOFFICEOPNGOPENINGOPPOPPOSITEOSBORIENTED STRANDBOARDPARAPARALLELPERPPERPENDICULARPLPLATEPLAMPLASTIC LAMINATEPLASPLASTERPLYWDPLYWOODPRPAIRPRCSTPRECASTPTPAINTPTDPAPER TOWELDISPENSERPTD/RCOMBINATIONPAPER TOWELDISPENSER/RECEPTACLEPTNPARTITIONPTRPAPER TOWELRECEPTACLEQTQUARRY TILERRISER(R)REMOVERADRADIUSRBRUBBER BASERDROOF DRAINRECRECESSEDREFREFERENCEREFGREFRIGERATORREHABREHABILITATEREINFREINFORCEDREPREPAIRREQREQUIREDRESILRESILIENTRESRESTORERFREFINISHRGTRREGISTERFLROOF LEADERRMROOMROROUGH OPENINGRWDREDWOODRWLRAIN WATERLEADERSSOUTHSALVSALVAGESCSOLID CORESCDSEAT COVERDISPENSERSCHEDSCHEDULESDSOAP DISPENSERSECTSECTIONSHSHELFSHRSHOWERSHTSHEETSHTHGSHEATHINGSIMSIMILARSLDSEE LANDSCAPEDRAWINGSSLRSEALERSMDSEE MECHANICALDRAWINGSSNDSANITARY NAPKINDISPENSERSNRSANITARY NAPKINRECEPTACLESPECSPECIFICATIONSQSQUARESSSTAINLESS STEELSSDSEE STRUCTURALDRAWINGSSSKSERVICE SINKSTASTATIONSTDSTANDARDSTLSTEELSTORSTORAGESTRUCSTRUCTURALSUSPSUSPENDEDSVSHEET VINYLSYMSYMMETRICALTTREADTBTOWEL BARTCATILE COUNCIL OFAMERICATELTELEPHONETERTERRAZZOT&GTONGUE & GROOVETHKTHICKTOTOP OFTOCTOP OF CURBTOPTOP OF PAVINGTOWTOP OF WALLTPDTOILET PAPERDISPENSERTRTRASHRECEPTACLETRDTREADTVTELEVISIONTYPTYPICALUNFUNFINISHEDUONUNLESSOTHERWISE NOTEDURURINALVCTVINYLCOMPOSITION TILEVERTVERTICALVESTVESTIBULEVIFVERIFY IN FIELDVPVENEER PLASTERVTRVENT THROUGHROOFVWVINYLWALLCOVERINGWWESTW/WITHWCWATER CLOSETWCVWALLCOVERINGWDWOODWOWHERE OCCURSW/OWITHOUTWPWATERPROOFWSCTWAINSCOTWTWEIGHTLOCATION:CIVIC CENTER DRIVEDOWNEY, CA 90241ARCHITECTURAL RESOURCES GROUP SHEET TITLEREVISIONSDESCRIPTIONDATEISSUANCEPROJ NO.DRAWNCHECKEDDRAWING NO.DOWNEYGRAMMARSCHOOLARCH REPAIRBID SETJuly 22, 20252404251CIVIC CENTER DRIVE,DOWNEY, CA, 90241T1.01ABBREVIATIONS,GENERAL NOTES,PROJECT DATA,AND SYMBOLSMP / BTMP / LKM / LY

3'-412"1A2.004A2.003A2.002A2.00ARCH ABOVE SHOWN DASHED15'-012"6'-31 2"(E) QUARRY TILE PAVING, NOT IN SCOPE(E) CONCRETEARCH WALLSARCHITECTURAL RESOURCES GROUP SHEET TITLEREVISIONSDESCRIPTIONDATEISSUANCEPROJ NO.DRAWNCHECKEDDRAWING NO.DOWNEYGRAMMARSCHOOLARCH REPAIRBID SETJuly 22, 20252404251CIVIC CENTER DRIVE,DOWNEY, CA, 90241A1.00PLAN1A1.00PLAN1" = 1'-0"0111" = 1'-0"2GENERAL NOTESA.PRIOR TO START OF WORK, CONTRACTOR TO INSTALLPROTECTION TO PREVENT DAMAGE TO SITE ELEMENTS DUETO CONSTRUCTION ACTIVITIES AND USE OF CONSTRUCTIONMATERIALS. PROTECTION TO REMAIN UNTIL COMPLETION OFWORK IN THAT AREA.B.PROTECT (E) QUARRY TILE PAVING INSIDE AND AROUND THEARCH DURING CONSTRUCTION. CONTRACTOR TO RETURNPAVERS TO PRE-CONSTRUCTION CONDITION IF DAMAGEDDURING CONSTRUCTION.C.PROTECT (E) LANDSCAPING IN PLACE. CONTRACTOR TORETURN LANDSCAPING TO PRE-CONSTRUCTION CONDITION IFDAMAGED DURING CONSTRUCTION.D.PHOTO DOCUMENT SITE CONDITION AND SUBMIT PHOTOS TOCLIENT AND ARCHITECT BEFORE ANY CONSTRUCTIONACTIVITY BEGINS.MP / BTMP / LKM / LYNN

4A2.002A2.0015'-01"(N) TREATED 2 X 6LEDGER(N) PRE-FINISHEDGALVANIZED SHEETMETAL COUNTERFLASHING(N) TREATED2 X 4'S @ 24" O.C.(N) 3/4"MARINE-GRADEPLYWOODSHEATHING(N) CANT STRIPOVER COPING(N) PVCSINGLE-PLYMEMBRANEROOFING(N) PRE-FINISHEDGALVANIZED SHEETMETAL FLASHING W/DRIP EDGE AT 1 SIDESLOPE1/4" PER FOOTMINIMUM2A8.101A8.101A2.003A2.0015'-012"6'-31 2"(E) BRICK COPING UNITS@ TOP OF CONC WALL(E) CAVITY AT TOP OF ARCH FILLED W/ TRASH & DEBRIS.EXPOSED / CORRODED REBAR VISIBLE.(E) CONCWALLS(E) WOODLEDGER3A8.10ARCHITECTURAL RESOURCES GROUP SHEET TITLEREVISIONSDESCRIPTIONDATEISSUANCEPROJ NO.DRAWNCHECKEDDRAWING NO.DOWNEYGRAMMARSCHOOLARCH REPAIRBID SETJuly 22, 20252404251CIVIC CENTER DRIVE,DOWNEY, CA, 90241A1.10EXISTING AND PROPOSEDROOF PLAN1A1.10PROPOSED ROOF PLAN1" = 1'-0"N0111" = 1'-0"2GENERAL NOTESA.REMOVE (E) MATERIAL DEBRIS (WOOD, MASONRY, LEAVES,TRASH, ETC.) FROM CAVITY ABOVE ARCH.B.CLEAN & VACUUM SURFACES TO REMOVE ANY REMAININGDIRT / DEBRIS.C.PREP & COAT EXPOSED REBAR W/ SIKA ARMATEC 110 ORSIMILAR.D.REASSESS CONC CONDITION AT TOP OF ARCH & WALLSWHEN CLEAN, AND REPAIR AS REQUIRED.E.PATCH CONCRETE SPALLS WITH CEMENTITIOUS REPAIRMORTAR (SIKATOP 123 PLUS OR SIMILAR).F.REPLACE (E) WOOD LEDGER W/ (N) TREATED WOOD 2 X 6 OR2 X 8. ANCHOR TO (E) CONC WALL W/ S.S. BOLTS.G.INSTALL CANT STRIP OVER (E) BRICK COPING.H.INSTALL (N) 3/4" MARINE-GRADE PLYWOOD SHEATHING OVER(N) TREATED 2 X 4 JOISTS SPACED @ 24 O.C.I.INSTALL (N) SINGLE-PLY PVC MEMBRANE ROOF, SIKASARNAFIL G410 OR SIM. TURN UP MEMBRANE AS BASEFLASHING ON 3 WALLS.J.PROVIDE GALVANIZED SHEET METAL FLASHING W/ DRIPEDGE ON LOW SLOPE SIDE AND (N) GALVANIZEDCOUNTER-FLASHING AT 3 SIDES, SET W/ REGLET,PRE-FINISHED COLOR SELECTED BY ARCHITECT.2A1.10EXISTING ROOF PLAN1" = 1'-0"BTMP / SD / LKMN

3A2.00SOUTH ELEVATIONAPPROX. 1/2" = 1'-0"4A2.00WEST ELEVATIONAPPROX. 1/2" = 1'-0"33(E) BRONZE PLAQUE,NOT IN SCOPE(E) BRONZE PLAQUE,NOT IN SCOPE11121111121A2.00NORTH ELEVATIONAPPROX. 1/2" = 1'-0"2A2.00EAST ELEVATIONAPPROX. 1/2" = 1'-0"11111111211GENERAL NOTESA.CLIENT TO REMOVE (E) TEMPORARY ROOF OVER THE ARCHBEFORE START OF WORK.B.CLEAN ALL WALL SURFACES WITH WARM WATER APPLIED ATLOW PRESSURE BEFORE ANY CONCRETE AND STUCCOREPAIR AND PAINTING. REFER TO SPECIFICATIONS FORCLEANING PROCEDURES.C.SOUND ENTIRE ARCH TO IDENTIFY LOOSE AND DEBONDEDSTUCCO. SUBMIT ANNOTATED ELEVATIONS OR DRAWINGSMARKING HOLLOW-SOUNDING AREAS FOR ARCHITECT ANDCLIENT REVIEW. PROVIDE ARCHITECT ACCESS TO REVIEWAND CONFIRM AREAS REQUIRING STUCCO REPLACEMENT.ASSUME 50 SQ FT OF REPLACEMENT ALLOWANCE ANDVARIED PATCHING DEPTH FOR WORK NOT MARKED ONELEVATIONS.D.DURING CONCRETE REPAIR, REPLACE SIGNIFICANTLYCORRODED REINFORCEMENT WITH (N) STAINLESS STEELREBAR. REFER TO SPECIFICATIONS FOR REPLACEMENTCRITERIA.E.FOLLOWING REPAIR, PREPARE, PRIME, AND PAINT ENTIREARCH.KEY NOTESNOT IN USEROUT OUT AND PATCH CRACK IN STUCCO AND/ORCONCRETE. TOOL PATCHED SURFACE TO MATCHADJACENT SOUND FINISH.PATCH SPALL, LOSS, OR NON-COMPATIBLE REPAIRIN STUCCO AND/OR CONCRETE. TOOL PATCHEDSURFACE TO MATCH ADJACENT SOUND FINISH.WHERE CORRODED REBAR EXHIBITS ORANGESTAINS ON SURFACE, EXPOSE REBAR, CLEAN,TREAT WITH CORROSION-INHIBITING AGENT, ANDFILL CAVITY WITH CEMENTITIOUS PATCHINGMORTAR.123ARCHITECTURAL RESOURCES GROUP SHEET TITLEREVISIONSDESCRIPTIONDATEISSUANCEPROJ NO.DRAWNCHECKEDDRAWING NO.DOWNEYGRAMMARSCHOOLARCH REPAIRBID SETJuly 22, 20252404251CIVIC CENTER DRIVE,DOWNEY, CA, 90241A2.00ELEVATIONS1/2" = 1'-0"0224MP / BTMP / LKM / LY

CRACK REPAIRNTS1A8.00MIN. 1/2"15°APPROX.MIN.3/4"MIN.3/4"MIN.1"ELEVATION VIEWSECTION VIEWPATCH REPAIR (LARGER THAN 24 SQ.IN. IN AREA AND 1 INCH IN DEPTH)NTS7A8.00SOUTH ELEVATIONNTS5A8.00EAST ELEVATIONNTS3A8.00NORTH ELEVATIONNTS6A8.00WEST ELEVATIONNTS2A8.00ARCHITECTURAL RESOURCES GROUP SHEET TITLEREVISIONSDESCRIPTIONDATEISSUANCEPROJ NO.DRAWNCHECKEDDRAWING NO.DOWNEYGRAMMARSCHOOLARCH REPAIRBID SETJuly 22, 20252404251CIVIC CENTER DRIVE,DOWNEY, CA, 90241A8.00DETAILSMP / BTMP / LKM / LY

ARCH ROOF SECTION (EXISTING)3/4" = 1'-0"3A8.10(STUCCO)REMOVE(E) WOODLEDGERPATCHREPAIR (E)CONCRETEAS REQUIREDW/ SIKATOP123 PLUS ORSIM.TOP OF ARCH(E) BRICKCOPINGREMOVE DEBRISAND CLEAN AREATO BE REPAIREDAND RE-ROOFEDREMOVE ADDITIONALCONCRETE AROUNDEXPOSED REBAR ASREQUIRED. PREP ANDCOAT REBAR W/ SIKAARMATEC 110 OR SIM.1'-0"FLASHING @ TOP OF ROOF (PROPOSED)1 1/2" = 1'-0"2A8.10SAWCUT REGLET,FILL W/ SEALANTPRE-FINISHED GALVANIZEDRECEIVER FLASHINGSCREW W/ NEOPRENEWASHERPRE-FINISHED GALVANIZEDCOUNTER-FLASHINGSINGLE-PLY PVCMEMBRANE ROOF3/4" MARINE-GRADEPLYWOOD SHEATHINGTREATED 2 X 4'S@ 24" O.C.(N) TREATED 2 X 6LEDGER, ANCHOR TOCONC WALL W/ SSTHREADED RODSSET IN EPOXYSEALANTMIN. SLOPE1/4" / FTFLASHING @ BOTTOM OF ROOF (PROPOSED)1 1/2" = 1'-0"1A8.10(ARCH)SINGLE-PLY PVCMEMBRANE ROOFPRE-FINISHED GALVANIZEDSHEET METAL FLASHING W/DRIP EDGE(E) BRICK COPINGTO REMAINTREATED 2 X LEDGER,ANCHOR TO CONC W/SS THREADED RODSSET IN EPOXYCLEAN / REMOVEDEBRIS AT CAVITYABOVE ARCHPREP & COAT (E) REBARW/ SIKA ARMATEC 110OR SIMILAR3/4" MARINE-GRADEPLYWOOD SHEATHINGTREATED 2 X 4'S @ 24" O.C.PRESSURE-TREATEDWOOD SHIM, AS REQUIREDMIN. SLOPE1/4" / FTARCHITECTURAL RESOURCES GROUP SHEET TITLEREVISIONSDESCRIPTIONDATEISSUANCEPROJ NO.DRAWNCHECKEDDRAWING NO.DOWNEYGRAMMARSCHOOLARCH REPAIRBID SETJuly 22, 20252404251CIVIC CENTER DRIVE,DOWNEY, CA, 90241A8.10ROOF DETAILSBTMP / SD / LKM