Item No. 5.

TO:HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM:OFFICE OF THE CITY MANAGER
BY:MATTHEW BAUMGARDNER, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER DATE:MAY 26, 2026
SUBJECT:APPROVAL OF CONSTRUCTION CONTRACT FOR BELLFLOWER BLVD. WATER SYSTEM IMPROVEMENTS, CAPITAL IMPROVEMENT PROJECT (CIP) NO. 18-10

EXECUTIVE SUMMARY

The City Council will consider awarding a contract to All Cities Engineering, Inc. in the amount of $2,433,669 for the construction of the Bellflower Boulevard Water System Improvements, CIP No. 18-10. The proposed water improvements, which would occur on Bellflower Boulevard from Foster Road to Lakewood Boulevard and along Priscilla Street east of Bellflower Boulevard, are necessary to ensure reliable water service in the area and are recommended to be completed prior to upcoming pavement rehabilitation along this street.

RECOMMENDATION

That the City Council:

1. Award a contract to All Cities Engineering, Inc. in the amount of $2,433,669, for the construction of Bellflower Blvd. Water System Improvements, CIP No. 18-10;

2. Approve the transfers of $150,000, $500,000, and $250,000 from Water Fund, CIP Account Nos. 51-1-8665, 51-1-8689, and 51-1-8695 to Water Fund, CIP Account No. 51-1-8680; and,

3. Authorize the City Manager, or his designee, to execute any change orders or additional scope of work for this project deemed necessary or desirable up to the approved project budget of $3,150,000.

BACKGROUND

The water system infrastructure along Bellflower Boulevard from Foster Road to Lakewood Boulevard and along Priscilla Street east of Bellflower Boulevard is in need of improvements to ensure reliable water service for domestic usage and fire protection purposes. The proposed water improvements are to be completed in advance of upcoming pavement rehabilitation in order to eliminate impacts to newly installed pavement in the future. The project limits are shown on the project location map included as Attachment A.

ANALYSIS

On March 24, 2026, the City Council approved plans and specifications and granted authority to advertise the subject project for bids (Attachment B). A copy of the project specifications is available for review in the Public Works Department. The proposed water improvements include: the installation of 1,836 feet of new 8-inch water main and 416 feet of new 12-inch water main along Bellflower Boulevard; installation of valves, fittings, and appurtenances; replacement of existing fire hydrants; installation of additional fire hydrants to enhance fire water protection in the area; installation of new copper water service lines; and replacement of old water meters with new remote-read advanced water meters along the entire project limits to help improve water meter reading efficiencies.

The project was advertised in the Downey Patriot on April 2, 2026 and April 9, 2026 and published in Planet Bids.

On April 22, 2026, the City received seven bids electronically through Planet Bids ranging from $2,433,669 to $4,451,460. The bid results were as follows:

CONTRACTOR LOCATION BID
AMOUNT
All Cities Engineering, Inc.Riverside $2,433,669
T.E. Roberts, Inc.Irvine $2,734,200
Williams Pipeline Contractors, Inc.Mission
Hills $2,904,275
Creative Home, Inc. DBA CHI
Construction Fullerton $2,997,624
Big Ben Engineering Irvine $3,399,610
J.A. Salazar Construction and
Supply Corp.La Habra $4,249,480
Mike Bubalo Construction
Company, Inc.

Baldwin
Park $4,451,460
The lowest responsive and responsible bidder is All Cities Engineering, Inc. in the amount of $2,433,669 (Attachment C). Staff reviewed the bid proposal and references provided by All Cities Engineering, Inc. and found that All Cities Engineering, Inc. has satisfactorily completed projects for the Cities of Beverly Hills, Downey, Garden Grove, Jurupa Community Services District, Los Angeles, Santa Monica, Ventura, and others. All Cities Engineering, Inc.’s state contractor’s license is “current and active,” and this contractor is registered with the California Department of Industrial Relations (DIR) for Labor Compliance. Staff recommends that the City Council award a contract to All Cities Engineering, Inc. for the construction of the Bellflower Boulevard Water System Improvements, CIP No. 18-10.

Construction is anticipated to begin in June 2026 and be completed in December 2026.

This project is statutorily exempt from the provisions of CEQA under Section 15282(k).

CITY COUNCIL PRIORITIES

Quality of Life, Safety and Infrastructure

FISCAL IMPACT

Approval of the recommended actions will result in an expenditure of approximately $3,060,000, (break down listed below) from Water Fund Capital Improvement Program (CIP) Account No. 51-1-8680 as provided in the table below.

Description Amount
Design $163,849
Construction Contract $2,433,669
Contingencies (10%)$243,667
City-Furnished Materials $19,115
Materials Testing and
Contract Administration $200,000
Total Estimated Project Cost:$3,060,000
There is sufficient fund balance for the recommended actions as provided in the table below.

Account
No.Funding Source Amount
51-1-
8680
FY 2025-26 Bellflower
Boulevard Water System
Improvements CIP
$2,250,000
51-1-
8680
Transfer from CIP Account No.
51-1-8665 $150,000
51-1-
8680
Transfer from CIP Account No.
51-1-8689 $500,000
51-1-
8680
Transfer from CIP Account No.
51-1-8695 $250,000
Total Project Funding:$3,150,000

Attachments
Attachment A: Bellflower Blvd Water System Improvements Attachment B: Bellflower Blvd Water System Improvements Attachment C: Bellflower Blvd Water System Improvements

CITY OF DOWNEY

DEPARTMENT OF PUBLIC WORKS UTILITIES DIVISION

PROJECT LOCATION MAP
PROJECT:BELLFLOWER BOULEVARD WATER SYSTEM IMPROVEMENTS
UMITS:FOSTER ROAD TO LAKEWOOD BOULEVARD

ATTACHMENT A

TITLE SHEET, VICINITY MAP, AND CONSTRUCTION NOTES

CITY OF DOWNEY

PUBLIC WORKS DEPARTMENT
’

ONSTRUCTION NOTES
” ATTACHMENT B

GENERAL NOTES AND MATERIAL SPECIFICATIONS

“

FOSTER ROAD TO PRISCILLA STREET

ONSTRUCTION NOTES
”

BELLFLOWER BOULEVARD

FOSTER ROAD

NALLEY BELCHER STREET
MATCHLINE STA 92+50SEE SHEET 480
90 85+00 86+00 87+00
90 88+00 89+00
80 90+00 91+00

PRISCILLA STREETPRISCILLA STREET
84+00
9663
FOSTER RD.
9662
BLECHER ST.
9663
BLECHER ST.
9662
PRISCILLA ST.
9663
PRISCILLA ST.
9703
PRISCILLA ST.
13220
BELLFLOWER BLVD.

LEWIS ELEMENTARY SCHOOL
9733
PRISCILLA ST.
9729
PRISCILLA ST.
9725
PRISCILLA ST.
9719
PRISCILLA ST.
9713
PRISCILLA ST.
9709
PRISCILLA ST.
13220
BELLFLOWER BLVD.

LEWIS ELEMENTARY SCHOOL 9662ANGELL ST.

PRISCILLA STREET TO BORSON STREET

ONSTRUCTION NOTES

BELLFLOWER BOULEVARD
NMATCHLINE STA 101+50SEE SHEET 5SEE SHEET 3MATCHLINE STA 92+50ANGELL STREET INTERSTATE 105 CENTURY FWY ADOREE STREET

ADOREE STREET
9662
ANGELL ST.13052BELLFLOWER BLVD.13038
BELLFLOWER BLVD.9602ADOREE ST.9603
ADOREE ST.
9563
ADOREE ST.
9562
BORSON ST.
9562
BORSON ST.

BORSON STREET TO IMPERIAL HIGHWAY

ONSTRUCTION NOTES
NBELLFLOWER BOULEVARD MATCHLINE STA 112+50SEE SHEET 6SEE SHEET 4MATCHLINE STA 101+50BORSON STREET IMPERIAL HIGHWAYDALEN STREET

BORSON STREET CHEDDAR STREET
85 75
95 85
95 75
9602
BORSON ST.
9603
BORSON ST.
9563
BORSON ST.
9602
CHEDDAR ST.
9603
CHEDDAR ST.
12801
BELLFLOWER BLVD.
12757
BELLFLOWER BLVD.12747, 12745, 12743, 12741,12737, 12735, 12733BELLFLOWER BLVD.9506 IMPERIAL HWY.
12626, 12624
BELLFLOWER BLVD.
9501
IMPERIAL HWY.
9454 IMPERIAL HWY.12626, 12624BELLFLOWER BLVD.9609
BORSON ST.
9610
BORSON ST.
9603
ADOREE ST.

9449
IMPERIAL HWY.

KAISER PERMANENTE 9449
IMPERIAL HWY.

KAISER PERMANENTE
12460, 12456, 12454, 12452, 12436, 12434, 12430
BELLFLOWER BLVD.
12351
BELLFLOWER BLVD.12323
BELLFLOWER BLVD.
12302
BELLFLOWER BLVD.
12460, 12456, 12454,
12452, 12436, 12434, 12430
BELLFLOWER BLVD.
12334 BELLFLOWER BLVD.

INDEPENDENCE PARK 12365BELLFLOWER BLVD.12345
BELLFLOWER BLVD.

IMPERIAL HIGHWAY TO CONGRESSMAN STEVE HORN WAY

ONSTRUCTION NOTES

BELLFLOWER BOULEVARD

NIMPERIAL HIGHWAY
MATCHLINE STA 123+50SEE SHEET 7SEE SHEET 5MATCHLINE STA 112+5090 114+00 115+00 116+00
90 117+00 118+00 119+00 120+00 121+00
100100
122+00113+00
80 80

CONGRESSMAN STEVE HORN WAY TO WASHBURN ROAD

ONSTRUCTION NOTESBELLFLOWER BOULEVARD
NMATCHLINE STA 136+50SEE SHEET 8SEE SHEET 6MATCHLINE STA 123+50APPOLO WAYCONGRESSMAN STEVE HORN WAY 12254
BELLFLOWER BLVD.
12200
BELLFLOWER BLVD.
12140
BELLFLOWER BLVD.
12140
BELLFLOWER BLVD.
12323
BELLFLOWER BLVD.12302BELLFLOWER BLVD.

WASHBURN ROAD TO STEWART AND GRAY ROAD

ONSTRUCTION NOTES
NMATCHLINE STA 149+00SEE SHEET 9SEE SHEET 7MATCHLINE STA 136+50BELLFLOWER BOULEVARD

WASHBURN ROAD ELM VISTA DRIVE
9203
WASHBURN RD.
12044
BELLFLOWER BLVD.
12048-12054
BELLFLOWER BLVD.
12032-12038
BELLFLOWER BLVD.12020BELLFLOWER BLVD.12010
BELLFLOWER BLVD.9202ELM VISTA DR.12006BELLFLOWER BLVD.12074 LAKEWOOD BLVD.
12074
LAKEWOOD BLVD.
12070
LAKEWOOD BLVD.
12060
LAKEWOOD BLVD.
12058
LAKEWOOD BLVD.
12056
LAKEWOOD BLVD.
12052
LAKEWOOD BLVD.
11934
BELLFLOWER BLVD.
11944
BELLFLOWER BLVD.11914BELLFLOWER BLVD.11926
BELLFLOWER BLVD.
12024
BELLFLOWER BLVD.11918BELLFLOWER BLVD.12052 LAKEWOOD BLVD.

STEWART AND GRAY ROAD TO BUCKLES STREET

ONSTRUCTION NOTES
NMATCHLINE STA 156+50SEE SHEET 10SEE SHEET 8MATCHLINE STA 149+00BELLFLOWER BOULEVARD

STEWART AND GRAY ROAD
11904 & 11908
BELLFLOWER BLVD.11706-11708BELLFLOWER BLVD.11714

BELLFLOWER
BLVD.11724BELLFLOWER BLVD.11724BELLFLOWER BLVD.11740BELLFLOWER BLVD.11742-11746BELLFLOWER BLVD.11750BELLFLOWER BLVD.11756BELLFLOWER BLVD.11701 BELLFLOWER BLVD.11715BELLFLOWER BLVD.11723BELLFLOWER BLVD.11729BELLFLOWERBLVD.11733-11735BELLFLOWER BLVD.11739 BELLFLOWER BLVD.11751BELLFLOWER BLVD.9119

BELLFLOWER
11755BELLFLOWER BLVD.11719BELLFLOWER BLVD.11702BELLFLOWER BLVD.12052 LAKEWOOD BLVD. 9143
STEWART AND GRAY RD.
9151
STEWART AND GRAY RD.
9157
STEWART AND GRAY RD.11743ADENMOOR AVE.11739ADENMOOR AVE.11733ADENMOOR AVE.11727ADENMOOR AVE.11723ADENMOOR AVE.11709ADENMOOR AVE.

BUCKLES STREET TO STA 161+00

ONSTRUCTION NOTES
NMATCHLINE STA 161+00SEE SHEET 12SEE SHEET 9MATCHLINE STA 156+50BELLFLOWER BOULEVARD

BUCKLES STREET
100
158+00 159+00 160+00
100
110110
157+00156+00
90 90
11628BELLFLOWER BLVD.11638
BELLFLOWER BLVD.11644BELLFLOWER BLVD.11648BELLFLOWER BLVD.11654-11664 BELLFLOWER BLVD.11702BELLFLOWER BLVD.11637
BELLFLOWER BLVD.
11661
BELLFLOWER BLVD.
9067
BUCKLES ST.11701BELLFLOWER BLVD.11703ADENMOOR AVE.11663ADENMOOR AVE.11659ADENMOOR AVE.11643ADENMOOR AVE.11627ADENMOOR AVE.11633ADENMOOR AVE.11639ADENMOOR AVE.11611 LAKEWOOD BLVD.

STA 161+00 TO HALL ROAD

ONSTRUCTION NOTES
NMATCHLINE STA 165+50SEE SHEET 12SEE SHEET 10MATCHLINE STA 161+00BELLFLOWER BOULEVARD 100 100
162+00 163+00 164+00 165+00
110110

HALL ROAD
90 90
11531BELLFLOWER BLVD.9049
HALL RD.11604BELLFLOWER BLVD.11610BELLFLOWER BLVD.11614BELLFLOWER BLVD.11620BELLFLOWER BLVD.11622BELLFLOWER BLVD.11610 LAKEWOOD BLVD.11523BELLFLOWER BLVD.11531BELLFLOWER BLVD.9070 HALL RD.
11613
ADENMOOR AVE.11617ADENMOOR AVE.11623ADENMOOR AVE.

HALL ROAD TO LAKEWOOD BOULEVARD

ONSTRUCTION NOTES
NSEE SHEET 11MATCHLINE STA 165+50BELLFLOWER BOULEVARD

LAKEWOOD BOULEVARD
100
166+00 167+00 168+00 169+00 170+00 171+00
110

IOWA STREET
100
110
11500

LAKEWOOD
BLVD.11434BELLFLOWERBLVD.9006
MARGARET ST.
11440
BELLFLOWER BLVD.
90 1
9 IO
W
A

S
T
.
11510
LAKEWOOD BLVD.11519BELLFLOWERBLVD.9024
IOWA ST.
90 3
0 IO
W
A

S
T
.
9023
IOWA ST.

POTABLE WATER RECONNECTION DETAILS
CONNECTION TO 8" W A1 ABANDONMENT OF 6" W A2 CONNECTION TO 4" W A3 CONNECTION TO 8" W A4 CONNECTION TO 4" W A5 CONNECTION TO 8" W A6
CONNECTION TO 8" W A7
CONNECTION TO 8" W A8
CONNECTION TO 8" W A9 CONNECTION TO 8" W A10 CONNECTION TO 4" W CONNECTION TO 12" W A11 A12

POTABLE WATER RECONNECTION DETAILS
CONNECTION TO 8" W A13 CONNECTION TO 12" W A14 CONNECTION TO 8" W A15 CONNECTION TO 6" W A16 CONNECTION TO 8" W A17 CONNECTION TO 8" W A18 CONNECTION TO 8" W A19 CONNECTION TO 4" W A20 CONNECTION TO 4" W A21 4" W ABANDONMENT A22 CONNECTION TO 8" W A23 4" W SERVICE RECONNECTION A24 4" W SERVICE RECONNECTION A25

FIRE SERVICE RECONNECTION DETAILS
B1

FIRE SERVICE RECONNECTION
STA 125+31 B2

FIRE SERVICE RECONNECTION
STA 131+88 B3

FIRE SERVICE RECONNECTION
STA 166+92

WATER SYSTEM DETAILS
Z
U
R

NWILKINSCONSTRUCTION ITEMS / MATERIALS LIST
3 4
5 7
8 9
1 2
10 11
10 9
117
8 4
3 2
1 6
5 CONSTRUCTION ITEMS / MATERIALS LIST
3 4
5 6
7 9
1 2
8 7
9 6
5 3
2 1
8 4
7 6

CONSTRUCTION ITEMS / MATERIALS LIST
2 5
1 2
43 5
6 7
3 4 WATER

DEAD END

TYPICAL SECTION
CROSS
ELEV. (TYP. VERT. BEND)

REDUCER
TEE
90° BEND

HORIZONTAL / VERTICAL ANCHOR AND THRUST BLOCK

RECYCLED WATER SYSTEM DETAILS
14 CONSTRUCTION ITEMS / MATERIALS LIST
3 4
5 6
7 8
1 2
9 10
11 12
13 14
15 16
17 RW
13 15
16 17
3 63
7 8
12 11
10 9
1 3
92 5 4
5 7
6 CONSTRUCTION ITEMS / MATERIALS LIST
2 5

RECYCLED
WATER
1 2
3 4
5 6
7 3
4 UnitQty.DescriptionItem AmountUnit Price AmountUnit PriceAmountUnit PriceAmountUnit Price 1 Detail "A1" at Appox. Station 84+83.LS1 25,500.00 25,500.00$$ 24,109.00 24,109.00$23,000.00$23,000.00$34,800.00$34,800.00$$ 2 Detail "A2" at Approx. Station 84+83.LS1 17,000.00 17,000.00$$ 14,452.00 14,452.00$16,700.00$16,700.00$21,600.00$21,600.00$$ 3 Detail "A3" at Approx. Station 86+33.LS1 26,500.00 26,500.00$$ 54,810.00 54,810.00$46,000.00$46,000.00$44,400.00$44,400.00$$ 4 Detail "A4" at Approx. Station 10+60.LS1 18,000.00 18,000.00$$ 17,431.00 17,431.00$24,500.00$24,500.00$22,800.00$22,800.00$$ 5 Detail "A5" at Approx. Station 10+46.LS1 13,000.00 13,000.00$$ 18,017.00 18,017.00$14,800.00$14,800.00$20,400.00$20,400.00$$ 6 Detail "A6" at Approx. Station 91+06.LS1 15,000.00 15,000.00$$ 16,819.00 16,819.00$17,300.00$17,300.00$22,800.00$22,800.00$$ 7 Detail "A7" at Approx. Station 91+06.LS1 25,200.00 25,200.00$$ 22,297.00 22,297.00$25,000.00$25,000.00$34,800.00$34,800.00$$ 8 Detail "A8" at Approx. Station 91+79.LS1 22,000.00 22,000.00$$ 35,718.00 35,718.00$22,300.00$22,300.00$30,000.00$30,000.00$$ 9 Detail "A9" at Approx. Station 11+36.LS1 21,000.00 21,000.00$$ 20,605.00 20,605.00$27,500.00$27,500.00$28,800.00$28,800.00$$ 10 Detail "A10" at Approx. Station 10+06.LS1 15,000.00 15,000.00$$ 16,377.00 16,377.00$27,500.00$27,500.00$25,200.00$25,200.00$$ 11 Detail "A11" at Approx. Station 117+70.LS1 15,000.00 15,000.00$$ 19,100.00 19,100.00$16,300.00$16,300.00$21,600.00$21,600.00$$ 12 Detail "A12" at Approx. Station 118+12.LS1 2,000.00 2,000.00$$ 51,532.00 51,532.00$68,000.00$68,000.00$43,200.00$43,200.00$$ 13 Detail "A13" at Approx. Station 118+12.LS1 21,000.00 21,000.00$$ 20,606.00 20,606.00$21,300.00$21,300.00$25,200.00$25,200.00$$ 14 Detail "A14" at Approx. Station 121+78.LS1 22,000.00 22,000.00$$ 32,587.00 32,587.00$10,000.00$10,000.00$27,600.00$27,600.00$$ 15 Detail "A15" at Approx. Station 156+82.LS1 26,150.00 26,150.00$$ 37,857.00 37,857.00$13,000.00$13,000.00$34,800.00$34,800.00$$ 16 Detail "A16" at Approx. Station 159+78.LS1 30,000.00 30,000.00$$ 39,588.00 39,588.00$17,300.00$17,300.00$39,600.00$39,600.00$$ 17 Detail "A17" at Approx. Station 160+10.LS1 12,800.00 12,800.00$$ 13,859.00 13,859.00$11,000.00$11,000.00$19,200.00$19,200.00$$ 18 Detail "A18" at Approx. Station 161+58.LS1 12,000.00 12,000.00$$ 13,625.00 13,625.00$11,000.00$11,000.00$19,200.00$19,200.00$$ 19 Detail "A19" at Approx. Station 163+72.LS1 31,800.00 31,800.00$$ 39,726.00 39,726.00$39,500.00$39,500.00$39,600.00$39,600.00$$ 20 Detail "A20" at Approx. Station 167+09.LS1 11,000.00 11,000.00$$ 14,205.00 14,205.00$12,000.00$12,000.00$19,200.00$19,200.00$$ 21 Detail "A21" at Approx. Station 10+02.LS1 18,000.00 18,000.00$$ 28,618.00 28,618.00$15,500.00$15,500.00$25,200.00$25,200.00$$ 22 Detail "A22" at Approx. Station 168+84.LS1 16,000.00 16,000.00$$ 14,322.00 14,322.00$15,500.00$15,500.00$27,600.00$27,600.00$$ 23 Detail "A23" at Approx. Station 170+35.LS1 23,000.00 23,000.00$$ 21,695.00 21,695.00$26,400.00$26,400.00$31,200.00$31,200.00$$ 24 Detail "B1" at 12254 Bellflower Boulevard.LS1 5,000.00 5,000.00$$ 28,556.00 28,556.00$10,000.00$10,000.00$31,200.00$31,200.00$$ 25 Detail "B2" at 12200 Bellflower Boulevard.LS1 5,000.00 5,000.00$$ 70,264.00 70,264.00$42,600.00$42,600.00$60,000.00$60,000.00$$ 26 Detail "B3 at 11510 Bellflower Boulevard.LS1 5,000.00 5,000.00$$ 41,856.00 41,856.00$18,800.00$18,800.00$39,600.00$39,600.00$$ 27 Furnish and install new 8-inch MJ 45º DIP horizontal bend and thrust block.EA4 1,200.00 4,800.00$$ 1,253.00 5,012.00$1,500.00$6,000.00$1,920.00$7,680.00$$ 28 Furnish and install new 12-inch MJ 90º DIP horizontal bend and thrust block.EA1 1,900.00 1,900.00$$ 2,658.00 2,658.00$2,200.00$2,200.00$4,200.00$4,200.00$$ 29 Furnish and install new 8-inch MJ 22.5° DIP vertical bend and anchor block.EA2 3,000.00 6,000.00$$ 1,957.00 3,914.00$1,800.00$3,600.00$1,800.00$3,600.00$$ 30 Furnish and install new 8-inch MJ 45º DIP vertical bend and anchor block.EA16 4,000.00 64,000.00$$ 1,127.00 18,032.00$2,800.00$44,800.00$1,920.00$30,720.00$$ 31 Furnish and install new 12-inch MJ 45º DIP vertical bend and anchor block.EA2 5,500.00 11,000.00$$ 1,842.00 3,684.00$4,200.00$8,400.00$4,200.00$8,400.00$$ 32 Furnish and install new 8-inch FL tee and thrust block.EA3 2,250.00 6,750.00$$ 2,295.00 6,885.00$3,500.00$10,500.00$3,600.00$10,800.00$$ 33 Furnish and install new 12-inch FL tee and thrust block.EA1 4,000.00 4,000.00$$ 4,379.00 4,379.00$5,000.00$5,000.00$8,400.00$8,400.00$$ 34 Furnish and install new 4-inch x 12-inch FL reducer and anchor block.EA1 5,250.00 5,250.00$$ 2,694.00 2,694.00$1,800.00$1,800.00$25,200.00$25,200.00$$ 35 Furnish and install new 8-inch MJxFL adapter.EA4 1,000.00 4,000.00$$ 1,248.00 4,992.00$1,200.00$4,800.00$15,600.00$62,400.00$$ 36 Furnish and install new 12-inch MJxFL adapter.EA2 1,500.00 3,000.00$$ 1,786.00 3,572.00$1,650.00$3,300.00$2,640.00$5,280.00$$ 37 Furnish and install new 8-inch MJxFL C509 gate valve and anchor block.EA6 2,800.00 16,800.00$$ 4,343.00 26,058.00$4,200.00$25,200.00$6,480.00$38,880.00$$ 38 Isolate, cut, and dewater existing 4-inch water service lateral, remove existing valve; and furnish and install new 4-inch MJ C509 gate valve and associated materials.EA1 16,000.00 16,000.00$$ 13,477.00 13,477.00$10,500.00$10,500.00$7,200.00$7,200.00$$ 39 Isolate, cut, and dewater existing 12-inch main, remove existing tee, valve, and valve box; furnish and install new 12-inch CL 52 CML DIP with 12-inch solid sleeves and associated materials.EA1 18,000.00 18,000.00$$ 16,235.00 16,235.00$16,500.00$16,500.00$9,120.00$9,120.00$$ 40 Remove existing, furnish and install new 2-inch potable water combination air release and vacuum valve (reuse existing service and enclosure).EA1 10,000.00 10,000.00$$ 12,294.00 12,294.00$2,500.00$2,500.00$$6,540.00 6,540.00$$ 41 Remove existing, furnish and install new potable water valve box.EA8 2,000.00 16,000.00$$ 941.00 7,528.00$2,000.00$16,000.00$$960.00 7,680.00$$ 42 Remove existing valve box to abandon valve in place.EA5 1,500.00 7,500.00$$ 499.00 2,495.00$700.00$3,500.00$$600.00 3,000.00$$ 43 Furnish and install new 8-inch CL 52 CML DIP with potable water ID tape.LF1,859 250.00 464,750.00$$ 348.00 646,932.00$450.00$836,550.00$192.00$$356,928.00$ 44 Furnish and install new 12-inch CL 52 CML DIP with potable water ID tape.LF412 362.00 149,144.00$$ 333.00 137,196.00$550.00$226,600.00$216.00$$88,992.00$ Furnish and install new James Jones 3700-R fire hydrant assembly (8-inch x 6-inch Hot Tap).45 EA1 10,000.00 10,000.00$$ 18,383.00$18,383.00 31,800.00$$31,800.00 40,800.00$40,800.00$$ Furnish and install new James Jones 3700-R fire hydrant assembly (8-inch x 6-inch Tee).46 EA2 12,800.00 25,600.00$$ 16,934.00$33,868.00 20,000.00$$40,000.00 33,600.00$67,200.00$$ Furnish and install new James Jones 3775-R fire hydrant assembly (8-inch x 6-inch Tee).47 EA1 16,000.00 16,000.00$$ 17,694.00$17,694.00 26,500.00$$26,500.00 36,000.00$36,000.00$$ 48 Furnish and install new fire hydrant assembly (12-inch x 6-inch Tee) (reuse existing fire hydrant head).EA1 12,000.00 12,000.00$$ 12,608.00 12,608.00$18,000.00$$18,000.00 28,800.00$28,800.00$$ 49 Furnish and install new 8-inch x 6-inch MJ reducer and James Jones 3775-R fire hydrant assembly (reuse existing lateral).EA1 22,000.00 22,000.00$$ 18,324.00 18,324.00$15,000.00$$15,000.00 32,400.00$32,400.00$$ 50 Isolate, cut, and dewater existing 8-inch main, remove existing fire hydrant assembly from main; furnish and install new James Jones 3700-R fire hydrant assembly (8-inch x 6-inch Tee).EA3 25,000.00 75,000.00$$ 22,292.00 66,876.00$22,500.00$67,500.00$32,400.00$97,200.00$$ CAPITAL IMPROVEMENT PROJECT NO. 18-10
Bellflower Boulevard Water System Improvements (Foster Road to Lakewood Boulevard)

BID SUMMARY
Reconstruct Fire Service Per Items 24 to 26
Potable Water Main, Fittings, and Associated Improvements Potable Water Ductile Iron Pipe
Abandon and Reconnect to Existing Water Main by Constructing Per Items 1 to 23 April 22, 2026
All Cities Engineering, Inc CHI ConstructionWilliams Pipeline Contractors Inc.T.E. Roberts, Inc.

Fire Hydrants

ATTACHMENT C

UnitQty.DescriptionItem AmountUnit Price AmountUnit PriceAmountUnit PriceAmountUnit Price All Cities Engineering, Inc CHI ConstructionWilliams Pipeline Contractors Inc.T.E. Roberts, Inc. 51 Isolate, cut, and dewater existing 8-inch main,remove existing fire hydrant assembly from main; furnish and install new James Jones 3775-R fire hydrant assembly (8-inch x 6-inch Tee).EA1 27,000.00 27,000.00$$ 23,756.00 23,756.00$24,500.00$24,500.00$34,800.00$34,800.00$$ 52 Isolate, cut, and dewater existing 12-inch main, remove existing fire hydrant assembly from main; furnish and install new James Jones 3775-R fire hydrant assembly (12-inch x 6-inch Tee).EA2 27,500.00 55,000.00$$ 24,057.00 48,114.00$26,500.00$53,000.00$32,400.00$64,800.00$$ 53 Remove existing fire hydrant riser from and including 90-degree elbow to fire hydrant head, furnish and install new James Jones 3700-R fire hydrant.EA1 12,000.00 12,000.00$$ 13,704.00 13,704.00$12,500.00$12,500.00$27,600.00$27,600.00$$ 54 Remove existing fire hydrant riser from and including 90-degree elbow to fire hydrant head, furnish and install new James Jones 3775-R fire hydrant.EA2 13,000.00 26,000.00$$ 15,383.00 30,766.00$14,500.00$29,000.00$30,000.00$60,000.00$$ 55 Remove existing and furnish and install new fire hydrant riser (reuse existing 90° elbow and fire hydrant head).EA5 13,500.00 67,500.00$$ 5,360.00 26,800.00$7,500.00$37,500.00$3,600.00$18,000.00$$ 56 Remove existing fire hydrant riser from and including 90° elbow to fire hydrant head, plug remaining portion of fire hydrant lateral, and remove fire hydrant valve box.EA5 3,000.00 15,000.00$$ 4,130.00 20,650.00$1,000.00$5,000.00$720.00$3,600.00$$ 57 Paint private fire hydrant with one coat of Standard White (WH-1) Ameron Amerlock 2 VOC High Solids Epoxy Coating and two finish coats of Safety Red (RD-2) Ameron PSX 700 Engineered Siloxane coating.EA3 1,500.00 4,500.00$$ 1,797.00 5,391.00$1,800.00$5,400.00$600.00$1,800.00$$ 58 Remove existing and furnish and install new 5/8-inch Sensus iPerl backflow by-pass water meter, 520M MXU touchpad, and MXU mounting bracket on existing fire service backflow.EA2 1,200.00 2,400.00$$ 3,736.00 7,472.00$1,200.00$2,400.00$2,520.00$5,040.00$$ 59 Furnish and install new 5/8-inch Sensus iPerl backflow by-pass water meter, 520M MXU touchpad, and MXU mounting bracket on existing fire service backflow.EA1 1,100.00 1,100.00$$ 3,736.00 3,736.00$1,200.00$1,200.00$2,520.00$2,520.00$$ Remove existing and furnish and install new curb stop, 5/8-inch meter, and box.60 EA5 3,000.00 15,000.00$$ 7,405.00 37,025.00$2,700.00$13,500.00$3,600.00$18,000.00$$ 61 Remove/Abandon existing and furnish and install new 1-inch potable water service, 5/8-inch meter, and box.EA16 5,500.00 88,000.00$$ 8,543.00 136,688.00$9,000.00$144,000.00$9,000.00$144,000.00$$ Remove existing and furnish and install new curb stop, 1-inch potable water meter, and box.62 EA3 4,900.00 14,700.00$$ 2,796.00 8,388.00$3,000.00$9,000.00$3,600.00$10,800.00$$ Remove existing and furnish and install new 1-inch potable water meter and box.63 EA3 1,800.00 5,400.00$$ 2,637.00 7,911.00$2,800.00$8,400.00$3,600.00$10,800.00$$ Remove existing and furnish and install new 1-inch meter and lid only (reuse existing box).64 EA11 1,500.00 16,500.00$$ 1,314.00 14,454.00$1,500.00$16,500.00$3,240.00$35,640.00$$ 65 Remove/Abandon existing and furnish and install new 1-inch potable water service, 1-inch meter, and box.EA5 5,000.00 25,000.00$$ 3,710.00 18,550.00$9,500.00$47,500.00$7,920.00$39,600.00$$ 66 Remove/Abandon existing and furnish and install new 2-inch potable water service, 1-1/2-inch meter, and box.EA10 11,000.00 110,000.00$$ 9,208.00 92,080.00$12,000.00$120,000.00$30,000.00$300,000.00$$ Remove existing and furnish and install new curb stop, 2-inch potable water meter and box.67 EA2 6,500.00 13,000.00$$ 8,389.00 16,778.00$5,800.00$11,600.00$12,000.00$24,000.00$$ Remove existing and furnish and install new 2-inch potable water meter and box.68 EA9 4,500.00 40,500.00$$ 4,092.00 36,828.00$5,000.00$45,000.00$12,000.00$108,000.00$$ 69 Remove/Abandon existing and furnish and install new 2-inch potable water service, 2-inch meter, and box.EA5 15,000.00 75,000.00$$ 10,706.00 53,530.00$12,000.00$60,000.00$16,800.00$84,000.00$$ Remove/Abandon existing service, meter (if any), and box from main.70 EA2 5,000.00 10,000.00$$ 2,809.00 5,618.00$1,500.00$3,000.00$1,440.00$2,880.00$$ 71 Remove existing and furnish and install new 4-inch potable water service and 3-inch meter (reuse existing box).EA1 28,000.00 28,000.00$$ 19,295.00 19,295.00$17,000.00$17,000.00$22,800.00$22,800.00$$ 72 Remove existing and furnish and install new 3-inch potable water meter, 3-inch meter box and downstream 3-inch MJxFL C509 gate valve (reuse existing service).EA1 25,000.00 25,000.00$$ 13,383.00 13,383.00$17,000.00$17,000.00$28,800.00$28,800.00$$ 73 Furnish and install new 1-inch copper building supply line downstream of new water meter up to closest hose bibb and remove backyard water source connection to old meter to be removed.EA5 4,400.00 22,000.00$$ 7,054.00 35,270.00$4,000.00$20,000.00$4,200.00$21,000.00$$ 74 Furnish and install new 2-inch copper building supply line downstream of new water meter up to closest hose bibb and remove backyard water source connection to old meter to be removed.EA13 10,600.00 137,800.00$$ 8,376.00 108,888.00$5,500.00$71,500.00$4,320.00$56,160.00$$ Remove existing and furnish and install new recycled water valve box.75 EA2 2,200.00 4,400.00$$ 1,615.00 3,230.00$1,500.00$3,000.00$960.00$1,920.00$$ 76 Remove existing and furnish and install new 2-inch recycled water combination air release and vacuum valve and enclosure (reuse existing service).EA1 10,000.00 10,000.00$$ 12,179.00 12,179.00$3,000.00$3,000.00$8,400.00$8,400.00$$ 77 Remove existing and furnish and install new 3-inch recycled water meter and box (reuse existing service).EA2 20,000.00 40,000.00$$ 14,188.00 28,376.00$15,000.00$30,000.00$6,000.00$12,000.00$$ 78 Remove existing and furnish and install new 3-inch recycled water meter, 3-inch meter box and downstream 3-inch MJ C509 gate valve (reuse existing service).EA1 21,000.00 21,000.00$$ 15,021.00 15,021.00$20,000.00$20,000.00$24,000.00$24,000.00$$ Remove existing and construct new 6-inch thick concrete.79 SF1,937 25.00 48,425.00$$ 22.00 42,614.00$25.00$48,425.00$12.00$23,244.00$$ Place class 450-C-2000 concrete backfill.80 LS2 12,500.00 25,000.00$$ 8,321.00 16,642.00$1,500.00$3,000.00$6,000.00$12,000.00$$ Place class 450-C-2000 concrete blanket.81 LS2 12,500.00 25,000.00$$ 8,321.00 16,642.00$1,500.00$3,000.00$7,200.00$14,400.00$$ 2,433,669.00$ 2,734,200.00 2,904,275.00$2,997,624.00$$ Engineer's Estimate

CONTRACTOR TOTAL BASE BID
All Cities Engineering, Inc
T.E. Roberts, Inc.

Williams Pipeline Contractors Inc.

CHI Construction
Big Ben Engineering
J.A. Salazar Construction and Supply Corp.

Mike Bubalo Construction Co., Inc.

Miscellaneous Improvements
2,659,021.00$
4,451,460.00$
TOTAL BASE BID – Items 1 to 81
ALL BIDS RECEIVED:
2,997,624.00$
Potable Water Main, Fittings, Meters and Services
Recycled Water Main, Fittings, and Associated Improvements Recycled Water Meters
2,433,669.00$
2,734,200.00$
2,904,275.00$
3,399,610.00$
4,249,480.00$