Item No. 7.
TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: OFFICE OF THE CITY MANAGER
BY: MATTHEW BAUMGARDNER, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER DATE: JUNE 9, 2026
APPROVAL OF A PROFESSIONAL SERVICES AGREEMENT WITH CANNON, INC. FOR SUBJECT: STRUCTURAL DESIGN SERVICES FOR THE FIRE APPARATUS STORAGE GARAGE
PRE-ENGINEERED METAL BUILDING (PEMB)
EXECUTIVE SUMMARY
The City Council will consider approving a Professional Services Agreement with Cannon, Inc. for structural engineering services for the design of a new Fire Apparatus Bay Garage at the Fire Training Center located at 12340 Bellflower Boulevard. The proposed facility will consist of an approximately 4,800-square-foot pre- engineered metal building (PEMB) with three apparatus bays to house reserve and out -of -service fire apparatus and equipment. The proposed improvements are needed to ensure fire apparatus equipment is properly protected during storage, which will help minimize the frequency of replacement for costly specialized vehicles.
RECOMMENDATION
That the City Council:
1. Approve a Professional Services Agreement with Cannon, Inc. in the amount of $111,750, for structural engineering services for the design of the Fire Apparatus Bay Garage Pre -Engineered Metal Building (PEMB);
2. Authorize the Mayor to execute the agreement; and,
3. Authorize the City Manager to execute any and all amendments to the agreement as deemed necessary.
BACKGROUND
The City of Downey Fire Department lacks adequate covered storage for reserve and out -of -service fire apparatus and equipment. These emergency vehicles are currently stored outside with no protection from the sun and weather, shortening their usable lifespan and increasing repair frequency. To address this need, the City proposes to construct a new Fire Apparatus Storage Garage at the Fire Training Yard located at 12340 Bellflower Boulevard.
The proposed facility will consist of an approximately 4,800-square-foot pre-engineered metal building (PEMB) with three apparatus bays, multiple roll -up doors, and supporting site improvements including an apparatus apron and driveway interface.
The selection of PEMB system in consistent with the Ckv's objective of delivering afuncdono] and durable storage facility in acosteffeciive manner. Bused on the intended use, the facility isclassified asuRisk Category || structure in accordance with the California Building Code (CBC). The project will be delivered using a delegated - design approach, with the PEK88 superstructure designed by the manufacturer and the founUo1inn, s|aU'on'graUe, and anchorage systems designed bythe Engineer nfRecord.
ANALYSIS
To initiate the design of the Fire Apparatus Storage Garage, Request for Proposal No. 26'050 for structural engineering services was released to the City's list of on -call consultants on November 25, 2025. The City received two proposals in response: one from Cannon, Inc. dated May 4. 2026, and one from Tetra Tech, Inc. dated Nomarnber25. 2025. Both proposals were reviewed and evaluated against criteria including technical mpproaoh, demonstrated experience with PEM8 and municipal faoi|itiea, team qum|ifiom1iona, and understanding of project requirements. Cannon. Inc. was selected as the most qualified firm. The Cannon proposal was found to include a comprehensive scope of services demonstrating a clear understanding of the project goals and teohnioal requirements for successful project delivery.
Cannon is m civil and structural engineering firm headquartered in |nvine. California, with demonstrated experience in the delivery of PEK48 and similar municipal support facilities throughout Southern California. Cannon has previously performed structural engineering services for the City of Downey, including the 8iruoiund Assessment and Shoring Design for the Water Utilities Division Office. The firm has assembled a qualified sub consultant team including L[}R Geo(ochnica| Group (gmoLeohnioa|). DOA Consulting Professional Engineers and Arc Flash San Diego (MEP), VVHA Architects (architectural performance criteria), and FCP Structures as the PEK48 fabricator facilitating coordination with Nucor Corp.
The scope of Cannon's engineering services includes the following tasks to produce the plans necessary to permit, bid, and construct the Fire Apparatus Storage Garage:
° Site Investigation, GnotechnicalExploration, and Document Verification » Site Visit, Coordination, and Project Management
o Geotochnioa||nveatiUadon
° Structural Engineering and Design Coordination
o Structural Engineering and PEK4BPerformance Specifications o Architectural Basis ofDesign
o Meohanioa|. Electrical, and Plumbing Design
» PEM8 Fabricator Coordination
° Construction Documents and Quality Assurance Planning o Structural Engineering
» Mechanical, Electrical, and Plumbing
» PEK48Fabricator Drawings
»Amhiteoture
° Plan Check Support and Agency Approval
» Structural Engineering
« Mechanical, Electrical, and Plumbing
» PEK4BFabricatnr
° Construction Administration and Observation
» Structural Engineering
» Mechanical, Electrical, and Plumbing
o Architecture
Staff is recommending that the City Council approve a Professional Services Agreement with Cannon, Inc. in the amount of $111,750 for structural engineering services for the design of the Fire Apparatus Storage Garage Pre - Engineered Metal Building. Design is anticipated to begin upon Notice -to -Proceed and is expected to be completed within approximately 15 weeks, exclusive of City review and plan check intervals.
CITY COUNCIL PRIORITIES
Quality of Life, Safety and Infrastructure
FISCAL IMPACT
Approval of the recommended actions will result in an expenditure of approximately $111,750. Funding from FY 2025-26 Capital Improvement Program (CIP) project funds, account 40-1-6947, will be utilized to cover the Total Estimated Design Cost.
Attachments
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD
CITY OF DOWNEY
PROFESSIONAL SERVICES AGREEMENT
WITH CANNON CORP. FOR STRUCTURAL ENGINEERING SERVICES
1. PARTIES AND DATE.
This Agreement is made and entered into this 9th day of June, 2026 by and between the City of Downey, a California municipal corporation and charter city with its principal place of business at 11111 Brookshire Avenue, Downey California 90241 ("City") and Cannon Corp., a California corporation, with its principal place of business at 1050 Southwood Drive, San Luis Obispo, CA 93401 ("Consultant"). City and Consultant are sometimes individually referred to as "Party" and collectively as "Parties."
2. RECITALS.
2.1 Consultant.
Consultant desires to perform and assume responsibility for the provision of certain professional structural engineering services required by City on the terms and conditions set forth in this Agreement. Consultant represents that it has demonstrated competence and experience in providing structural engineering services to public clients, is licensed in the State of California, and is familiar with the plans of City.
2.2 Project.
City desires to engage Consultant to render such services for the Structural Design for Fire Apparatus Garage Pre -Engineered Metal Building (PEMB)("Project") as set forth in this Agreement.
3. TERMS.
3.1 Scope of Services and Term.
3.1.1 General Scope of Services. Consultant promises and agrees to furnish to City all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately supply the professional structural engineering services necessary for the Project ("Services"). The Services are more particularly described in Exhibit "A", Consultant's Proposal for Structural Design for Fire Apparatus Garage Pre - Engineered Metal Building (PEMB) attached hereto and incorporated herein by reference.
All Services shall be subject to, and performed in accordance with, this Agreement, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations.
3.1.2 Term. The term of this Agreement shall be effective on the date of issuance of the City's written notice to proceed and shall continue in effect until December
ATTACHMENT A
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD 31, 2027, unless earlier terminated as provided herein. Consultant shall complete the Services within the term of this Agreement, and shall meet any other established schedules and deadlines. The term of this Agreement may be extended by written amendment to this Agreement signed by the City Manager and the Consultant.
3.2 Responsibilities of Consultant.
3.2.1 Control and Payment of Subordinates; Independent Contractor. The Services shall be performed by Consultant or under its supervision. Consultant will determine the means, methods and details of performing the Services subject to the requirements of this Agreement. City retains Consultant on an independent contractor basis and not as an employee. Consultant retains the right to perform similar or different services for others during the term of this Agreement. Any additional personnel performing the Services under this Agreement on behalf of Consultant shall also not be employees of City and shall at all times be under Consultant's exclusive direction and control. Consultant shall pay all wages, salaries, and other amounts due such personnel in connection with their performance of Services under this Agreement and as required by law. Consultant shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, disability insurance, and workers' compensation insurance.
In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (CaIPERS) to be eligible for enrollment in CaIPERS as an employee of City, Consultant shall indemnify, defend, and hold harmless CITY for the payment of any employee and/or employer contributions for CaIPERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City.
3.2.2 Schedule of Services. Consultant shall perform the Services expeditiously, within the term of this Agreement, and in accordance with the Schedule of Services set forth in Exhibit "A" attached hereto and incorporated herein by reference.
Consultant represents that it has the professional and technical personnel required to perform the Services in conformance with such conditions. In order to facilitate Consultant's conformance with the Schedule, City shall re2spond to Consultant's submittals in a timely manner. Upon request of City, Consultant shall provide a more detailed schedule of anticipated performance to meet the Schedule of Services. The parties acknowledge that the Schedule of Services may be amended by mutual agreement due to changes in circumstances, including changes in the performance schedules of other third parties performing work for the City on the Project, which affect the timing of Consultant's performance of the Services.
3.2.3 Conformance to Applicable Requirements. All work prepared by Consultant shall be subject to the approval of City.
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Substitution of Key Personnel. Consultant has represented to City that certain key personnel will perform and coordinate the Services under this Agreement. Should one or more of such personnel become unavailable, Consultant may substitute other personnel of at least equal competence upon written approval of City. In the event that City and Consultant cannot agree as to the substitution of key personnel, City shall be entitled to terminate this Agreement for cause. As discussed below, any personnel who fail or refuse to perform the Services in a manner acceptable to the City, or who are determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project or a threat to the safety of persons or property, shall be promptly removed from the Project by the Consultant at the request of the City.
3.2.4 City's Representative. The City hereby designates City Manager, or his or her designee, to act as its representative for the performance of this Agreement ("City's Representative"). City's Representative shall have the power to act on behalf of the City for all purposes under this Contract. Consultant shall not accept direction or orders from any person other than the City's Representative or his or her designee.
3.2.5 Consultant's Representative. Consultant hereby designates Hooman Tavallali, or his or her designee, to act as its representative for the performance of this Agreement ("Consultant's Representative"). Consultant's Representative shall have full authority to represent and act on behalf of the Consultant for all purposes under this Agreement. The Consultant's Representative shall supervise and direct the Services, using his best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Services under this Agreement.
3.2.6 Coordination of Services. Consultant agrees to work closely with City staff in the performance of Services and shall be available to City's staff, consultants and other staff at all reasonable times.
3.2.7 Standard of Care; Performance of Employees. Consultant shall perform all Services under this Agreement in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Consultant represents and maintains that it is skilled in the professional calling necessary to perform the Services. Consultant warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Services assigned to them. Finally, Consultant represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Services, including a City Business License, and that such licenses and approvals shall be maintained throughout the term of this Agreement. As provided for in the indemnification provisions of this Agreement, Consultant shall perform, at its own cost and expense and without reimbursement from the City, any services necessary to correct errors or omissions which are caused by the Consultant's failure to comply with the standard of care provided for herein. Any employee of the Consultant or its sub -consultants
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD who is determined by the City to be uncooperative, incompetent, a threat to the adequate or timely completion of the Project, a threat to the safety of persons or property, or any employee who fails or refuses to perform the Services in a manner consistent with the standard of care set forth herein, shall be promptly removed from the Project by the Consultant and shall not be re-employed to perform any of the Services or to work on the Project.
3.2.8 Laws and Regulations. Consultant shall keep itself fully informed of and in compliance with all applicable local, state and federal laws, rules and regulations in force at the time the Services are performed by Consultant and in any manner affecting the performance of the Project or the Services, including all applicable Cal/OSHA requirements, and shall give all notices required by law. Consultant shall be liable for all violations of such laws and regulations in connection with Services. If the Consultant performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the City, Consultant shall be solely responsible for all costs arising therefrom. Consultant shall defend, indemnify and hold City, its officials, directors, officers, employees and agents free and harmless, pursuant to the applicable indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations. Consultant's violation of such laws, rules and regulations shall also constitute a material breach of this Agreement.
3.2.9 Insurance.
3.2.9.1 Time for Compliance. Consultant shall not commence the Services or the Project under this Agreement until it has provided evidence satisfactory to the City that it has secured all insurance required under this section. In addition, Consultant shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under this section. The City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience with insurer, coverage or other special circumstances.
3.2.9.2 Minimum Requirements. Consultant shall, at its
expense, procure and maintain for the duration of the Agreement insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Agreement, the Services or the Project by the Consultant, its agents, representatives, employees or subcontractors. Consultant shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Agreement. Such insurance shall meet at least the following minimum levels of coverage:
(A) Minimum Scope of Insurance. (1) Commercial General
Liability (CGL): Insurance Services Office Form CG 00 01 covering CGL on an "occurrence" basis including products and completed operations, property damage, bodily injury and personal and advertising injury; (2) Automobile Liability: Insurance Services Office Form Number CA 0001 covering Code 1 (any auto) or if Consultant owns no autos, Code 8 (hired)
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD and 9 (non -owned); and (3) Workers' Compensation: Workers' Compensation insurance as required by the State of California with Statutory Limits; and (4) Employer's Liability Insurance.
(B) Minimum Limits of Insurance. Consultant shall maintain limits no less than: (1) Commercial General Liability (CGL): No less than $2,000,000 per occurrence for products and completed operations, bodily injury, property damage and personal and advertising injury. If Commercial General Liability Insurance or other form with general aggregate limit applies, either the general aggregate limit shall apply separately to this Agreement/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit; (2) Automobile Liability: No less than $2,000,000 per accident for bodily injury and property damage; and (3) Workers' Compensation: Workers' Compensation limits as required by the Labor Code of the State of California with Statutory Limits; (4) Employer's Liability: Employer's Liability limits of no less than $2,000,000 per accident for bodily injury or disease. Employer's Liability coverage may be waived by the City if City receives written verification that Consultant has no employees.
If the Consultant maintains broader coverage and/or higher limits than the minimum shown in this subdivision 3.2.10.2, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
3.2.9.3 Professional Liability (Errors & Omissions). Consultant shall procure and maintain, and require its sub -consultants to procure and maintain, for a period of five (5) years following completion of the Services or the Project, errors and omissions liability insurance appropriate to its profession. Such insurance shall be in an amount not less than $2,000,000 per occurrence or claim and $2,000,000 in the aggregate, and shall be endorsed to include contractual liability. If the Consultant maintains broader coverage and/or higher limits than the minimum shown in this subdivision 3.2.10.3, the City requires and shall be entitled to the broader coverage and/or higher limits maintained by the Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
3.2.9.4 Insurance Endorsements. The insurance policies shall contain the following provisions, or Consultant shall provide endorsements on forms approved by the City to add the following provisions to the insurance policies:
(A) Additional Insured Status. The Commercial General
Liability policy shall be endorsed to state that: (1) the City, its directors, officials, officers, employees, agents and volunteers shall be covered as additional insureds with respect to liability arising from the work, Services, Project or operations performed by or on behalf of the Consultant, including materials, parts or equipment furnished in connection with such work, Services. Project or operations; and (2) the insurance coverage shall be primary insurance as respects the City, its directors, officials, officers, employees, agents and volunteers, or if excess, shall stand in an unbroken chain of coverage excess of the Consultant's scheduled underlying coverage. Commercial General Liability insurance coverage may be provided in
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD the form of an endorsement to the Consultant's insurance (at lease as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33 or CG 20 38; and CG 20 37 forms if later revisions are used).
(B) Waiver of Subrogation. Consultant hereby grants to City a waiver of any right to subrogation which any insurer of said Consultant may acquire against the City by virtue of the payment of any loss under said insurance policies set forth herein. Consultant agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. (C) All Coverages. Each insurance policy required by this Agreement shall be endorsed to state that: (A) coverage shall not be suspended, voided, reduced or canceled except with written notice by mail to the City; and (B) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its directors, officials, officers, employees, agents and volunteers.
3.2.9.5 Primary Coverage. For any claims related to this Agreement, the Consultant's insurance coverage shall be primary insurance and primary coverage at least as broad as ISO CG 20 01 04 13 with respect to the City, its directors, officials, officers, employees, agents and volunteers. Any insurance or self-insurance maintained by the City, its directors, officials, officers, employees, agents and volunteers shall be excess of the Consultant's insurance and shall not be called upon to contribute with it in any way.
3.2.9.6 Separation of Insureds; No Special Limitations. All insurance required by this Section shall contain standard separation of insureds provisions.
In addition, such insurance shall not contain any special limitations on the scope of protection afforded to the City, its directors officials, officers, employees, agents and volunteers.
3.2.9.7 Deductibles and Self -Insurance Retentions. Any deductibles or self -insured retentions must be declared to and approved by the City. City may require Consultant to provide proof of ability to pay losses and related investigations, claim administration and defense expenses and costs within the retention. The policy language shall provide or be endorsed to provide that the self -insured retention may be satisfied by either the named insured or City.
3.2.9.8 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best's rating no less than A:VI1, authorized to do business in California, and satisfactory to the City.
3.2.9.9 Verification of Coverage. Consultant shall furnish City with original certificates of insurance, including all required amendatory endorsements (or copies of the applicable policy language effective coverage required by this provision) and a copy of
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD the Declarations and Endorsement Page of the Commercial General Liability policy listing all policy endorsements to the City before the commencement of work under this Agreement.
However, failure to obtain the required documents prior to the commencement of work under this Agreement shall not waive the Consultant's obligation to provide them to the City. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements, at any time.
3.2.9.10 Claims -Made Policies. If any of the policies provide coverage on a claims -made basis:
(A) The retroactive date must be shown and must be before the date of this Agreement or the date work commences under this Agreement, whichever is earliest; (B) Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the Services provided under this Agreement;
(C) If coverage is canceled, non -renewed, and not replaced with another claims -made policy form with a retroactive date prior to the effective date of this Agreement or the date work commences under this Agreement, whichever is earliest, the Consultant must purchase extended reporting coverage for a minimum of five (5) years after completion of the Services under this Agreement.
3.2.10 Safety. Consultant shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out its Services, the Consultant shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to:
(A) adequate life protection and life-saving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures.
3.3 Fees and Payments.
3.3.1 Compensation. Consultant shall receive compensation, including authorized reimbursements, for all Services rendered under this Agreement at the rates set forth in Exhibit "A" attached hereto and incorporated herein by reference. The total compensation shall not exceed One Hundred Eleven Thousand Seven Hundred Fifty Dollars ($111,750.00) without written approval of the City. Extra Work may be authorized, as described below, and if authorized, said Extra Work will be compensated at the rates and manner set forth in Exhibit "A" attached to this Agreement.
3.3.2 Payment of Compensation. Consultant shall submit to City a monthly itemized statement which indicates work completed and hours of Services rendered by
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Consultant. The statement shall describe the amount of Services and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. City shall, within thirty (30) days of receiving such statement, review the statement and pay all approved charges thereon.
3.3.3 Reimbursement for Expenses. Consultant shall not be reimbursed for any expenses unless authorized in writing by City.
3.3.4 Extra Work. At any time during the term of this Agreement, City may request that Consultant perform Extra Work. As used herein, "Extra Work" means any work which is determined by City to be necessary for the proper completion of the Project, but which the parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from the City Manager.
3.3.5 Prevailing Wages. Pursuant to Downey Municipal Code Section 2935, the requirements of California Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et sea. ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on certain "public works" and "maintenance" projects, shall apply to the Project.
Consultant agrees to fully comply with such Prevailing Wage Laws. City shall provide Consultant with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Consultant shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Consultant's principal place of business and at the Project site. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. If applicable, Consultant shall be registered at all times with the Department of Industrial Relations under the Public Works Contractor Registration Program for Labor Compliance.
3.4 Accounting Records.
3.4.1 Maintenance and Inspection. Consultant shall maintain complete and accurate records with respect to all costs and expenses incurred under this Agreement. All such records shall be clearly identifiable. Consultant shall allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.
3.5 General Provisions.
3.5.1 Termination of Aareement.
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD
3.5.1.1 Grounds for Termination. City may, by written notice to Consultant, terminate the whole or any part of this Agreement at any time either for cause or for the City's convenience and without cause by giving written notice to Consultant of such termination, and specifying the effective date thereof, at least seven (7) days before the effective date of such termination. Consultant may only terminate this Agreement for cause upon giving the City not less than seven (7) calendar days' written notice.
Upon termination, Consultant shall be compensated only for those services which have been adequately rendered to City, and Consultant shall be entitled to no further compensation. The City shall within fifteen (15) calendar days following termination pay the Consultant for all services adequately rendered and all reimbursable costs incurred by Consultant up to the date of termination, in accordance with the payment provisions of this Agreement.
The following reasons shall constitute "cause" for which either party may terminate this Agreement as provided herein:
• Substantial failure by the other party to perform in accordance with the terms of this Agreement and through no fault of the terminating party; • Assignment of this Agreement or transfer of the Project by either party to any other entity without the prior written consent of the other party; • Suspension of the Project or the Consultant's Services by the City for more than ninety (90) calendar days, consecutive or in the aggregate, without good cause; • Material changes in the conditions under which this Agreement was entered into, the Scope of Services or the nature of the Project, and the failure of the parties to reach agreement on the compensation and schedule adjustments necessitated by such changes.
3.5.1.2 Effect of Termination. If this Agreement is terminated as provided herein, City may require Consultant to provide all finished or unfinished Documents and Data and other information of any kind prepared by Consultant in connection with the performance of Services under this Agreement. Consultant shall be required to provide such Documents and Data and other information within fifteen (15) days of the City's request.
3.5.1.3 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.
3.5.2 Delivery of Notices. All notices permitted or required under this Agreement shall be given to the respective parties at the following address, or at such other address as the respective parties may provide in writing for this purpose:
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Consultant:
City:
Cannon Corp.
19000 MacArthur Boulevard, Suite 400
Irvine, CA 92614
Phone: (949) 668-1687
Attn: Hooman Tavallali, P.E., Director
City of Downey
11111 Brookshire Avenue
Downey, California 90241
Phone: (562) 904-7286
Fax: (562) 904-7296
Attn: Matt Baumgardner, P.E.,
Director of Public Works/City Engineer
With a courtesy copy to:
City of Downey
City Attorney's Office
11111 Brookshire Avenue
Downey, California 90241
Such notice shall be deemed made when personally delivered or when mailed, forty- eight (48) hours after deposit in the U.S. Mail, first class postage prepaid and addressed to the party at its applicable address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.
3.5.3 Ownership of Materials and Confidentiality.
3.5.3.1 Documents & Data; Licensing of Intellectual Property. This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement ("Documents & Data"). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were prepared by design professionals other than Consultant or provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD the purposes intended by this Agreement shall be at City's sole risk.
3.5.3.2 Confidentiality. All ideas, memoranda, specifications, plans, procedures, drawings, descriptions, computer program data, input record data, written information, and other Documents and Data either created by or provided to Consultant in connection with the performance of this Agreement shall be held confidential by Consultant.
Such materials shall not, without the prior written consent of City, be used by Consultant for any purposes other than the performance of the Services. Nor shall such materials be disclosed to any person or entity not connected with the performance of the Services or the Project. Nothing furnished to Consultant which is otherwise known to Consultant or is generally known, or has become known, to the related industry shall be deemed confidential.
Consultant shall not use City's name or insignia, photographs of the Project, or any publicity pertaining to the Services or the Project in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of City.
3.5.4 Cooperation; Further Acts. The Parties shall fully cooperate with one another, and shall take any additional acts or sign any additional documents as may be necessary, appropriate or convenient to attain the purposes of this Agreement.
3.5.5 Attorney's Fees. In the event of any litigation, whether in a court of law, administrative hearing, arbitration, or otherwise, arising from or related to this Agreement of the services provided under this Agreement, the prevailing party shall be entitled to recover from the non -prevailing party all reasonable costs incurred, including staff time, court costs, attorneys' fees and all other related expenses in such litigation.
3.5.6 Indemnification.
3.5.6.1 General Indemnification. Except as provided in subdivision
3.5.6.2 below which is applicable to "design professionals" only, Consultant shall defend (with counsel acceptable to City), indemnify and hold the City, its officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of or incident to any alleged negligent acts, errors, omissions or willful misconduct of Consultant, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Services, the Project or this Agreement, including without limitation the payment of all consequential damages and attorneys' fees and other related costs and expenses. The Consultant's duty to indemnify shall extend to any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity that Consultant and/or its personnel are employees of the City, have been misclassified as an independent contractors, or failed to pay any or all necessary state or federal withholdings and/or taxes. Consultant shall defend, at Consultant's own cost, expense and risk, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its directors, officials, officers, employees, agents or volunteers. Consultant shall pay and satisfy any judgment, award or decree that may be rendered against City or its directors,
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD officials, officers, employees, agents or volunteers, in any such suit, action or other legal proceeding. Consultant shall reimburse City and its directors, officials, officers, employees, agents and/or volunteers, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. Consultant's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its directors, officials officers, employees, and agents or volunteers. Consultant shall not be obligated to defend, indemnify or hold the City harmless in any manner whatsoever for any claims or liability arising solely out of the City's own negligent acts, errors or omissions or willful misconduct.
3.5.6.2 Design Professionals. The provisions of this subdivision
3.5.6.2 shall apply only in the event that Consultant is a "design professional" within the meaning of California Civil Code section 2782.8(c). If Consultant is a "design professional" within the meaning of Section 2782.8(c), then, notwithstanding subdivision 3.5.6.1 above, to the fullest extent permitted by law (including, without limitation, Civil Code sections 2782 and 2782.6), Consultant shall defend (with legal counsel reasonably acceptable to City), indemnify and hold harmless City and City's officers, officials, employees, volunteers and agents from and against any Claim that arises out of, pertains to, or relates to, directly or indirectly, in whole or in part, the negligence, recklessness, or willful misconduct of Consultant, any subconsultant, subcontractor or any other person directly or indirectly employed by them, or any person that any of them control, arising out of Consultant's performance of any task or service for or on behalf of City under this Agreement. The Consultant's duty to indemnify shall extend to any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity that Consultant and/or its personnel are employees of the City, have been misclassified as an independent contractors, or failed to pay any or all necessary state or federal withholdings and/or taxes. Such obligations to defend, hold harmless and indemnify City or any City officers, officials, employees or volunteers shall not apply to the extent that such Claims are caused in part by the sole active negligence or willful misconduct of City or such City officers, officials, employees, volunteers and agents. Consultant's cost to defend City and/or City's officers, officials, employees or volunteers against any such Claim shall not exceed Consultant's proportionate percentage of fault with respect to that Claim; however, pursuant to Civil Code section 2782.8(a), in the event that one or more defendants is unable to pay its share of defense costs due to bankruptcy or dissolution of the business, Consultant shall meet and confer with City (and, if applicable, other parties) regarding any unpaid defense costs. To the extent Consultant has a duty to indemnify City or any City officers, officials, employees, volunteers and/or agents under this subdivision 3.5.6.2, Consultant shall be responsible for all incidental and consequential damages resulting directly or indirectly, in whole or in part, from Consultant's negligence, recklessness or willful misconduct.
3.5.7 Entire Agreement. This Agreement contains the entire Agreement of the parties with respect to the subject matter hereof, and supersedes all prior negotiations, understandings or agreements.
3.5.8 Governing Law. This Agreement shall be governed by the laws of the
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD State of California. Venue shall be the courts in Los Angeles County.
3.5.9 Time of Essence. Time is of the essence for each and every provision of this Agreement.
3.5.10 City's Right to Employ Other Consultants. City reserves right to employ other consultants in connection with this Project.
3.5.11 Successors and Assigns. This Agreement shall be binding on the successors and assigns of the parties.
3.5.12 Assignment or Transfer. Neither party shall assign, hypothecate, or transfer, either directly or by operation of law, this Agreement or any interest herein without the prior written consent of the other party. Any attempt to do so shall be null and void, and any assignees, hypothecates or transferees shall acquire no right or interest by reason of such attempted assignment, hypothecation or transfer.
3.5.13 Construction; References; Captions. Since the Parties or their agents have participated fully in the preparation of this Agreement, the language of this Agreement shall be construed simply, according to its fair meaning, and not strictly for or against any Party. Any term referencing time, days or period for performance shall be deemed calendar days and not workdays. All references to Consultant include all personnel, employees, agents, and subcontractors of Consultant, except as otherwise specified in this Agreement.
All references to City include its elected officials, officers, employees, agents and volunteers except as otherwise specified in this Agreement. The captions of the various articles and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement.
3.5.14 Amendment; Modification. No supplement, modification, or amendment of this Agreement shall be binding unless executed in writing and signed by both Parties.
3.5.15 Waiver. No waiver of any default shall constitute a waiver of any other default or breach, whether of the same or other covenant or condition. No waiver, benefit, privilege, or service voluntarily given or performed by a Party shall give the other Party any contractual rights by custom, estoppel, or otherwise.
3.5.16 No Third Party Beneficiaries. There are no intended third party beneficiaries of any right or obligation assumed by the Parties.
3.5.17 Invalidity; Severability. If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.
3.5.18 Prohibited Interests. Consultant maintains and warrants that it has not
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD employed nor retained any company or person, other than a bona fide employee working solely for Consultant, to solicit or secure this Agreement. Further, Consultant warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Consultant, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, City shall have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of City, during the term of his or her service with City, shall have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.
3.5.19 Equal Opportunity Employment. Consultant represents that it is an equal opportunity employer and it shall not discriminate against any subcontractor, employee or applicant for employment because of race, religion, color, national origin, handicap, ancestry, sex or age. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. Consultant shall also comply with all relevant provisions of any City Minority Business Enterprise program, Affirmative Action Plan or other related programs or guidelines currently in effect or hereinafter enacted.
3.5.20 Labor Certification. By its signature hereunder, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self- insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services.
3.5.21 Authority to Enter Agreement. Consultant has all requisite power and authority to conduct its business and to execute, deliver, and perform the Agreement. Each Party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and bind each respective Party.
3.5.22 Counterparts. This Agreement may be executed in counterparts, each of which shall constitute one and the same instrument.
3.5.23 Effect of Conflict. In the event of any conflict, inconsistency, or incongruity between any provision of this Agreement, any of its exhibits, attachments, purchase order, or notice to proceed, the provisions of this Agreement will govern and control.
3.6 Subcontracting.
3.6.1 Prior Approval Required. Consultant shall not subcontract any portion of the work required by this Agreement, except as expressly stated herein, without prior written approval of City. Consultant shall require and verify that all subcontractors maintain insurance meeting all of the requirements set forth in this Agreement. Consultant shall ensure that City is an additional insured as required in Section 3.2.10.4. Subcontracts, if any, shall
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD contain a provision making them subject to all provisions stipulated in this Agreement.
CITY OF DOWNEY, CANNON CORP.
a California municipal corporation a California Corporation and charter city
Signed by:
By: By: FA
WKAaA, I a"RAa
Claudia M. Frometa, Mayor Hooman Tavallali
Its: Director
Attest: Attest:
Signed by:
Maria Alicia Duarte, CIVIC City Clerk Lawrence .Kraemer, Secretary Approved as to Form: Approved as to Form:
Signed by: Signed by:
�4 qw, -F------------
Jon un ,City Attorney Ro ert tets, Legal Counsel
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
May 4, 2026
Timothy Birthisel, P.E.
Principal Civil Engineer
City of Downey — Public Works Department
11111 Brookshire Avenue
Downey, CA 90241
PROJECT:
STRUCTURAL DESIGN FOR FIRE APPARATUS GARAGE PR
(PEMB)
Dear Mr. Birthisel:
Cannon has reviewed the City of Downey's (City) Request for Proposal No. 26-050 for structural engineering services associated with the proposed Fire Apparatus Bay Garage at the Fire Training Yard located at 12334 Bellflower Boulevard. We understand the City intends to construct a new pre-engineered metal building (PEMB) with approximately 4,800 sf, consisting of three (3) apparatus bays to be used for storage of reserve and out -of -service fire apparatus and equipment. Based on the intended use, the facility is classified as a Risk Category 11 structure in accordance with the California Building Code (CBC).
We are aware that the City's primary objective for this project is to deliver a functional and durable storage facility in a cost-effective manner. The selection of a Pre -Engineered Metal Building (PEMB) system is consistent with this objective, and we believe it provides an efficient approach for this type of low -occupancy structure. success of this delivery method relies on proper coordination between the geotechnical mmendations, foundation design, the PEMB vendor's delegated superstructure design, the supporting architectural and Mechanical, Electrical and Plumbing (MEP) performance 5n team, together with our geotechnical, architectural, and MEP subconsultants, 7sive experience in the delivery of PEMB and similar municipal support facilities It Southern California. We will utilize in-house staff and experienced subconsultants a coordinated geotechnical investigation, foundation and slab -on -grade design, ral building performance criteria, and MEP design for water, electrical, and 19000 MacArthur Blvd., Suite 400, 260247
Irvine, CA 92612
1 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
PROJECT UNDERSTANDING AND APPROACH
In order to store reserve and out -of -service fire apparatus and equipment, the City of Downey (City) plans to build a new, approximately 4,800 sf Fire Apparatus Bay Garage at the Fire Training Yard. The proposed structure will consist of a pre-engineered metal building (PEMB) with multiple roll -up doors and supporting site improvements, including an apparatus apron and driveway interface. Based on the intended use, the facility is classified as a Risk Category 11 structure in accordance with the California Building Code (CBC).
We understand that the project will be delivered using a delegated -design PEMB system, with the building superstructure designed by the manufacturer and the foundation, slab -on -grade, and anchorage systems designed by the Engineer of Record. The project also includes a project -specific geotechnical investigation and coordination with architectural and MEP systems to support water, electrical, and ventilation requirements.
We recognize that maintaining cost control and minimizing construction challenges are essential considerations for the City. Our approach will focus on developing efficient foundation solutions based on project -specific geotechnical data, and work in close coordination with the PEMB supplier to reconcile reactions, anchor bolt layouts, and shop drawings early in the process. Concurrently, we will coordinate architectural and MEP requirements with the PEMB performance specifications to ensure all building systems are integrated without unnecessary modifications during fabrication or construction. This coordination will help reduce the potential for redesign, delays, or change orders during construction. Our approach is structured to address these interfaces early and maintain alignment throughout design and construction.
Our proposed design work to successfully deliver this project is to closely follow the phases identified in the RFR
1 —Site Investiqation, Geotechnical Exploration and Document Cannon will conduct a site visit to verify existing conditions, access constraints, and the proposed building footprint. Our geotechnical subconsultant will perform a project -specific subsurface investigation, including contacting Underground Service Alert, obtaining required permits if applicable, and marking exploration locations. The field investigation will consist of one (1) CPT sounding and one (1) exploratory boring within the proposed building site to depths of approximately 50 feet, along with sampling and laboratory testing. rface conditions, groundwater, and geologic hazards,
seismic -related risks. Laboratory testing will include ion screening to support foundation and slab
19000 MacArthur Blvd., Suite 400, 260247
Irvine, CA 92612
3 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
The resulting geotechnical report will provide site -specific design parameters, incl' allowable bearing capacity, lateral earth pressures, seismic design criteria, slab -or support recommendations, and pavement sections for the apparatus apron and d The report also will include recommendations for earthwork and any remedial m required. Coordination with the City's civil engineer will be maintained to align grading, drainage, and building pad elevations with the geotechnical recommendations.
Phase 2 — Structural Engineering and Design Coordination In accordance with the current California Building Code (CBC 2025) and ASCE 7-22 for Risk Category II structures, a Structural design will be performed. Cannon will provide gravity and lateral performance criteria and design the foundation system, slab -on -grade, and anchorage to support PEMB column reactions. Foundation systems will be selected based on geotechnical recommendations and building reactions provided by the PEMB manufacturer.
We will develop structural performance specifications for the PEMB superstructure in the form of "Basis of Design", including design criteria, loading parameters, deflection limits, and interface requirements. While not specifically identified in the RFP, after our discussion with the City, we understand that Architectural Performance Criteria and limited MEP design are required. Additionally, we will be assisting the City with selecting the PEMB manufacturer and leading the coordination with the PEMB fabricator. We have contacted FCP Structures (FCP), the PEMB fabricator, to quickly get them on board as subconsultants to directly coordinate the PEMB design with the PEMB manufacturer (NUCOR Corp).
As the building supplier, FCP will act as the technical liaison between Cannon and the manufacturer. The primary goal is to ensure the building's specifications align with both the manufacturer's structural capabilities and the local municipal requirements for permitting and construction. The structural performance specifications will be coordinated with the architectural building performance criteria and the project's MEP requirements. Coordination with the architectural and MEP team will ensure that building systems, openings, and utility interface points are incorporated without requiring modifications to the PEMB system during on or construction.
II include an exhaust ventilation system with CO/NO2 controls, hose bibs, and ms consisting of power distribution, interior and exterior lighting, and required ns'and Title 24 documentation.
-wuscruuivrr UULU UM-5 unu L(uuncyHQ,.5WUfILr I-IUMMiy
al drawings, specifications, calculations, and an engineer's ROM estimate suitable for permitting will be provided. The structural plan set will include general structural lation and slab plaits, and anchorage details, together with PEMB performance 19000 MacArthur Blvd., Suite 400, 260247
Irvine, CA 92612
4 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
MEP drawings will be prepared by subconsultants and coordinated documents to provide a complete permit package. MEP deliverable plumbing, and electrical plans, and required load and energy calcul scope of work. Design submittals will be prepared at the 50%, 95% and coordination.
A Statement of Special Inspections and Quality Assurance Plan accordance with CBC Chapter 17, identifying required inspectii reinforcement, and anchorage systems.
Phase 4 — Plan Check Support and Agency Approval
Cannon will support the City throughout the plan review process b Safety and Public Works comments for up to two (2) review cycles. As needed for permit approval, coordination with the MEP team will be maintained to address discipline -specific issues, such as structural, electrical, and mechanical review comments. Responses will be organized to provide a consistent and complete resubmittal package, minimizing review time and avoiding conflicting revisions between disciplines.
Phase 5 — Construction Administration and Observation
During construction, we will review structural submittals, including shop drawings, anchor bolt layouts, and reinforcing details. The MEP and electrical consultants will review equipment and material submittals within their respective scope, including ventilation systems and electrical components.
We will respond to Requests for Information related to structural design and coordinate with the design team for interdisciplinary items. Structural observations will be performed at key construction milestones, and Structural Observation Reports indicating items that are not in general conformance with approved construction documents will be submitted to the Building Official as required. MEP construction assistance will be limited to submittal review ses to RAS within the defined scope.
Coordination and Project Management:
duct a site visit for verification of existing conditions, utility interfaces d building footprint (Cannon).
t and coordination with subconsultants and the City
civil engineer for grading, drainage, and building pad interface. o On -Site field investigation (Arc Flash SD).
19000 MacArthur Blvd., Suite 400, 260247
Irvine, CA 92612
S
T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
TASK 2 Geotechnical Investigations (LOR):
o Review the data created for the project, if any, and work with the City to! arrange subsurface investigation sites.
o If required obtain a no -fee permit from the (City), and markings of the CPT and boring locations and contacting Underground Service Alert of Southern California.
o Conduct one (1) CPT sounding in an accessible area of the proposed structure to a depth of approximately 50 to 60 feet, or refusal, whichever occurs first.
o Conduct one (1) exploratory boring utilizing a track mounted drill rig equipped with 8-inch diameter hollow stem augers to a maximum depth of approximately 50 feet or refusal within the area of the proposed structure.
o Sampling and in -place density testing of the natural earth materials encountered within the exploratory borings placed at the site. o Laboratory testing of soil samples obtained during the field investigation including, but not limited to, in -place density and moisture content, laboratory compaction characteristics, direct shear, expansion index, and corrosion screening.
o Development of geotechnical and geologic conclusions and recommendations for site development.
o Preparation of a report summarizing our investigation, with our conclusions and recommendations for site development.
Phase 2 — Structural Engineering and Design Coordination TASK 3 Structural Engineering (Cannon):
o Develop structural performance specifications (Basis of Design) for the delegated -design PEMB super structure including:
• Design criteria and load requirements (gravity, wind and seismic)
• Deflection limits and drift criteria
• Interface requirements for delegated design system
• Early engagement of the PEMB fabricator as subcontractor and direct coordination with fabricator.
o Design foundation system, slab -on -grade, and anchorage based on:
• Geotechnical recommendations
• PEMB vendor reactions
• CBC 2025 and ASCE 7-22
o Prepare Structural calculations package (at 95% submittal) o Project management coordination with:
• Architectural subconsultant for building performance criteria 19000 MacArthur Blvd., Suite 400, 260247
Irvine, CA 92612
6 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
• MEP subconsultants for system ai
(ventilation, hose bibs, electrical
o Project Management and coordination wit
• Column reactions
• Base plate and anchor bolt layoul
• Shop drawing assumptions and d
TASK Architectural Basis of Design (WHA):
o Develop Architectural performance specifi
the delegated -design PEMB super structur
TASK 5
Mechanical, Electrical and Plumbing Design (DDA and
o Mechanical design will include an exhaust ventilation system with time clock and CO / NO2 systems controls.
o Plumbing design will include hose bibs on each side of the building. o Provide mechanical, plumbing and electrical load calculations as required.
o Provide envelope and electrical energy calculations as required. o Provide basic engineering ROM cost as required.
TASK 6 PEMB Fabricator (FCP):
o Attend minimum of two (2) coordination meetings with Cannon and the City as needed
o PEMB design coordination with Cannon and other subconsultants during the design phase
o Facilitate the selection of Nucor Corp. building systems, including primary and secondary framing, and finish materials.
o Provide preliminary foundation reactions to Cannon for foundation design.
o Assist the project team in choosing the desired materials and finishes.
TASK Structural Engineering (Cannon):
o Prepare 50% set of foundation structural drawings including:
• General notes and structural specifications.
• Statement -of -Special Inspections and structural observations. • Foundation and slab on grade plans based on preliminary PEMB IN
Probable Construction Cost
19000 MacArthur Blvd., Suite 400, 260247
Irvine, CA 92612
7 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
n
n
• Address City comments on 50% subm
Prepare 95% set of set of foundation structurz
submission including:
• General notes and structural specifica
• Statement -of -Special Inspections and i
• Foundation and slab on grade plans b
reactions and soils report recommenc
• Typical details and interface specific d
Anchorage details
• Project management, QA/QC and coo
PEMB manufacturer.
• Prepare Engineer Probable Constructi
• Two (2) Teams meetings with the City during the design as needed.
TASK Mechanical, Electrical and Plumbing (DDA and Arc Flash SD):
o Prepare 50% set of MEP plans.
o Address City comments on 50% submittal set.
o Prepare 95% set of MEP plans for permit submission.
o Provide MEP specifications as required.
o Prepare Engineer Probable Construction Cost Estimate (ROM).
TASK PEMB Fabricator (FCP):
o Prepare 50%, 95% and 100% set of PEMB structural drawings o Prepare PEMB material and erection cost estimates
TASK 10 Architecture (WHA):
o Prepare an emergency egress plan showing the PEMB and surrounding elements at 95% and 100% set submittal milestones.
o Prepare architectural general notes for the "Builder Set" of drawings. ral Engineering (Cannon):
o Submit structural package for City of Downey Building & Safety and Public Works review.
o Respond to plan check comments for up to two (2) review cycles. a Coordinate interdisciplinary responses with MEP subconsultants. o Resolve structural review comments as required for permit approval and submit IFCiset of structural drawings.
o Project Management and Coordination with subconsultants. 19000 MacArthur Blvd., Suite 400 260247
Irvine, CA 92612
8 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
TASK 12 Mechanical, Electrical and Plumbing (DDA and Arc Flash SD):
o Submit MEP package for City of Downey Building & Safety and Public review.
o Respond to plan check comments for up to two (2) review cycles. o Resolve MEP review comments as required for permit approval and submit IFC set of MEP drawings.
TASK 13 PEMB Fabricator (FCP):
o Respond to plan check comments.
• Update PEMB construction drawings and calculations and issue IFC set of drawings (see assumptions and exclusions) and relay to the City feedback to the Nucor engineering team to ensure shop drawings are prepared for a successful permit submittal.
Phase 5 — Construction Administration and Observation
TASK 14 Structural Engineering (Cannon):
o Review structural submittals including PEMB shop drawings, anchor bolt plans, and reinforcing details.
o Respond to Structural RFIs
o Coordinate interdisciplinary RFIs involving structural, MEP, and PEMB vendor interfaces.
o Perform one (1) structural observation prior to pouring foundation. o Submit structural observation reports to Building Official as required.
TASK 15 Mechanical, Electrical and Plumbing (DDA and Arc Flash SD):
o Review equipment and material submittals.
o Respond to Requests for Information (RFI).
16 Architecture (WHA):
o Respond to Requests for Information (RFI).
o Review shop drawings
19000 MacArthur Blvd., Suite 400, 260247
Irvine, CA 92612
9 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
DELIVERABLES
The following deliverables will be provided:
• Signed and stamped Geotechnical report.
• PEMB performance specification (i.e. Basis of Design for delegated design criteria, loads, deflection limits, interfacerequirements).
• 50% set of structural (Foundation), mechanical, electrical and plumbing plans. • 95% set of structural (Foundation), mechanical, electrical and plumbing plans. • Stamped and signed IFC Drawings (structural (Foundation), mechanical, electrical and plumbing plans).
• Stamped and signed PEMB IFC drawings (see assumptions and exclusions) • Stamped and signed calculations sufficient to obtain permit. • Engineer Probable Construction Cost Estimate (ROM) at 50% and 95% submittals. • Written response to two (2) rounds of City plan check comments. • Written response to RFI's during construction.
• Review shop drawings and submittals.
ASSUMPTIONS AND EXCLUSIONS
• The project will consist of a pre-engineered metal building (PEMB) system with the superstructure designed by the PEMB manufacturer under a delegated design approach. We understand that the City will select the PEMB manufacturer and facilitate our coordination with the manufacturer. On -time selection and involvement of the PEMB manufacturer is important to meet the project schedule milestones.
Cannon can help with the PEMB manufacturer selection and direct coordination with them upon City's request and approval as an additional service. • The facility is classified as Risk Category 11 in accordance with the California Building Code (CBC) and ASCE 7-22.
• Structural scope is limited to the foundation system, slab -on -grade, and anchorage design, and development of PEMB performance specifications. • Builder's set: The scope of services under this agreement is limited to providing a "Builder's Set" of plans. This set of plans is sufficient to obtain a building design approval; however, all materials and methods of construction necessary to complete the project are not necessarily described in this "Builder's Set". The implementation of the plans requires a general contractor that is thoroughly knowledgeable with the applicable building codes, industry standards, manufacturers' requirements, and methods of construction.
• Cannon will coordinate directly with the PEMB fabricator FCP to convey the required performance criteria for the design of the PEMB superstructure. FCP will serve as the facilitator for the PEMB superstructure and will prepare 50%, 95%, and final design drawings and calculations. However, issuance of the final signed and stamped drawings and calculations is contingent upon execution of a procurement contract between the City and FCP. Initiation of this procurement is tied to material ordering 19000 MacArthur Blvd., Suite 400, 260247
Irvine, CA 92612
10 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
and carries an approximate 20% cancellation fee. Consequently, obtaining the signed' and stamped PEMB drawings and calculations will require either: (1) execution of a procurement contract directly between the City and FCP, or (2) deferral of the final signed and stamped drawings and calculations as a deferred submittal, package until such time that a contract between the City and FCP is in place. • PEMB vendor will provide complete and coordinated design reactions, anchor loads, and shop drawings for integration with foundation design. • Required soils parameters will be based on the Geotechn'ical report recommendations.
• , Geotechnical investigation scope is limited to:
o One (1) CPT sounding and one (1) exploratory boring within the building footprint.
• It is assumed that the PEMB can be supported by conventional shallow foundations (i.e. pile design is not considered as part of the scope of the work). • As required by State law, LOR will take precautions to avoid damage to subsurface structures and/or utilities by contacting Underground Service Alert of Southern California (DigAlert) at least two days prior to conducting any subsurface explorations. If in public right-of-way, LOR will contact the jurisdictional agency in an attempt to identify any subsurface structures and/or utilities not identified by USA, such as non -pressurized sewer or storm drain, or other non -pressurized drain lines.
LOR and Cannon will not be responsible for any damage to subsurface structures and or utilities which are not called to our attention and/or not duly and accurately described and located on any plans furnished to LOR prior to excavating. Private subsurface structures and/or utilities which are not under purview of USA should be identified to Cannon by the City prior to excavation activities by LOR. If requested by the City, Cannon can provide services to assist in locating such subsurface structures and/or utilities, for an additional fee.
• " Jurisdiction —the completed permit calculations and drawings package will be reviewed by the City. Plan check revisions will be made at no additional cost with the following exception - plan check review comments that result in design revisions that are not the responsibility of Cannon or are beyond the original structural design scope will be reviewed with Client. The additional design work will be coordinated with Client and/or completed on a time and material basis (T&M). Two (2) rounds of plan check comments is expected and included in the scope. • Excessive plan check comments and reviews will be reviewed with Client. _ If the comments are a result of inadequacies of the Cannon design, the revisions will be made at no additional cost. All other review comments will be coordinated with the client and/or completed on a time and material (T&M) basis. • Specifications - development of a separate specification booklet in this proposal are not included. General structural notes, submittal requirements, material properties, and inspection requirements will be included in the structural drawings. Project specifications, including MEP specifications, will be included on the plan sheets. 19000 MacArthur Blvd., Suite 400 260247
Irvine, CA 92612
11 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
• Any concrete flatwork adjacent to any buildings or any decorative concrete design work is not included in this proposal. Cannon can provide on a Time and Materials (T&M) basis if needed.
• Fire sprinkler requirements as well as fire service requirements have not been defined at this time and are excluded, however this can be provided if needed as an additional scope of work upon City's request and approval. • The need for garage area sumps/pumps, grease traps and oil/water separators have not been defined.
• Coordination with the City's civil engineer on grading, drainage and apron interface at the building permitter is included, however we understand that it is the City's intention to provide the required Civil Engineering services in-house. • Although it is not included in this proposal, Cannon can provide planning and civil engineering, or survey services for this project. If you have need for any of these professional services on this project or in the future, please notify us and we will provide additional proposals as appropriate.
• Detailed construction cost estimates are excluded (basic engineering ROM cost estimate is included).
• Cannon will coordinate directly with the City's representative for site access and scheduling.
• Submittal reviews include only two (2) rounds of contractor -provided submittals.
Additional submittal reviews may require additional funds at our hourly rate. • The following MEP scope is not included:
o Utility coordination/service upgrades (assumed the service size is adequate). o Gas system design.
o Hot water system design.
o Waste and vent system design.
o Storm drain system design (gutters and downspouts are assumed basis of design).
o DDC system design.
o Fire Sprinkler system design.
o Fire Alarm and/or Mass Notification system design.
o Cybersecurity system design.
o Low Voltage design.
o Arc flash studies.
o Coordination studies.
o LEED Documentation.
o Value Engineering.
o Commissioning.
19000 MacArthur Blvd., Suite 400 260247
Irvine, CA 92612
12 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
SCHEDULE
Our team is prepared to begin work immediately upon Notice -to -Proceed (NTP). The following schedule outlines major project milestones:
Phase No. Phase Descriptions No. of Weeks
Phase 1 Site Investigation and Geotechnical 6'weeks.
Exploration & Document Verification
Phase 2 Structural Calculations and Design Concurrent with phase 3 Phase 3 Construction Documents and Quality 4 weeks
Assurance Planning
Phase 4 Plan Check Support and Agency Approval 2 weeks
Phase 5 Construction Administration and Observation As needed Total Design Duration
Approximately twelve (12) weeks, not including the time for City review and plan check review. It should be noted that this timeline may be impacted by the City's' review process and coordination.
Assuming one to two -week review intervals, the major project milestones are expected to be as described below:
Milestone
Week No.
Notice to Proceed (NTP)
Week 0
Kickoff meeting and Site Visit
-Week 1
Receiving Preliminary Soils Design Parameter
Week 5
Final Soils Report Submittal
Week 7
50% Submittal
Week 7
City Review
Week 8
95% Submittal
Week 10
City and Plan Check Review — Round 1
Week 12
Addressing City Comment and Issue
Week 13
City and Plan Check Review — Round 2
Week 14
Issue IFC'drawings
Week 15
FEES
The following fixed fee includes all reimbursable expenses except for those indicated in the exclusions. See "Reimbursable Rate Schedule" and our hourly time rate for additional services as needed.
19000 MacArthur Blvd., Suite 400, 260247
Irvine, CA 92612
13 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
Fixed Fee:
Phase Description Estimated Fees
Phase 1
Site Investigation and Geotechnica) Exploration & Document , ,
Verification
Structural (Cannon) $ 6,400
MEP (Subconsultant) $ 1,000
Geotechnical Investigations (Subconsultant) $ 18,500
Phase 2 Structural Calculations and Design
Structural (Cannon) $ 12,500
MEP (Subconsultant) $ 9,500
Architectural (Subconsultant) $ 2,000
PEMB Fabricator (Subconsultant) $ 1,000
Phase 3 Construction Documents and Quality Assurance Planning Structural (Cannon) $ 15,800
MEP (Subconsultant) $ 10,500
Architectural (Subconsultant) $ 6,250
PEMB Fabricator (Subconsultant) $ 3,000
Phase 4 Plan Check Support and Agency Approval
Structural (Cannon) $ 6,800
MEP (Subconsultant) $ 1,000
Phase 5 Construction Administration and Observation
Structural (Cannon) $ 13,500
MEP (Subconsultant) $ 3,000
Architecture (Subconsultant) $ '1,000
FIXED FEES TOTAL 111 750
Reimbursables: Time and Materials
Reimbursable Rate Schedule
Black Line Plots $2.00 per page
Outside Reproduction Cost + 15%
Mylar Plots $12.00 per sheet
Automation & Electrical Materials Cost + 25% (+tax)
Subconsultant Fees Cost + 10%
Technology Fee $30/Day
Color Plots$5.00 per page
Travel and Related Subsistence Cost + 15% .
Standard Mileage Rate IRS Rate per mile
Airplane Mileage Rate GSA Rate per mile
19000 MacArthur Blvd., Suite 400, 260247
Irvine, CA 92612
14 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Cannon
Expenses, such as special equipment, shipping costs, travel other than by automobile, parking expenses, and permit fees will be billed at the actual cost plus 15%. The stated rates are subject to change, typically on an annual basis.
CALIFORNIA PREVAILING WAGE
It is our understanding that this project qualifies for California Prevailing Wages.
If the scope of our work requires the skilled trades which are subject to Prevailing Wage requirements, then our rates will reflect this. If the scope of our work does not require skilled trades which are subject to Prevailing Wage requirements, our rates will not reflect prevailing wage rates.
We will need a DIR Project ID so that we can file our 72-hour notification prior to performing on -site work.
19000 MacArthur Blvd., Suite 400, 260247
Irvine, CA 92612
15 T 949.753.8111
CannonCorp.us
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD w,
Cannon
Assistant Resident Engineer I - II
$ 173
- $ 201
Associate Engineer
$ 196
$ 235
Associate Land Surveyor
$ 230
- $ 245
Automation Specialist
$ 180
- $ 195
Automation Technician
$ 140
$ 155
CAD Tech
$ 127
- $ 142
CAD Manager
$ 145
$ 160
Construction Coordinator I II
$ 138
$ 153
Construction Inspector I - III �__^_....
$ 132
- $ 176
Construction Manager
$ 215
$ 230
Design Engineer
$ 160
$ 185
Director/ Department Manager
$ 247
- $ 307
Dry Utilities Coordinator I - II
$ 189
$ 204
Engineering Assistant I - IV
$ 122
$ 153
Grant Funding Manager I - II
$ 175
- $ 205
Information Systems Admin/Manager
$ 138
$ 160
Land Surveyor _ _ �
$ 218
mm��^�mmPPmmmm
$ 233
Lead Automation Specialist
p
$ 194
- $ 209
Lead Automation Technician
—_ _ ___________
$ 170
$ 185
Lead Designer
$ 155
$ 193
Office Engineer Document Control 1-I_._._...,.
171
Plan Check Engineer I - II .,_
_. .. . _.m.............
$ 152 _.._
- $ 202
_
Principal Automation Specialist
$ 212
$ 227
Principal Automation Technician
$ 190
$ 205
Principal Construction Manager
$ 247
$ 262
Principal Designer ...._,_......._
$ 147
$ 195
Principal Engineer
$mmm239 -....
$ 269
Project Designer
_ __ _______ __ ___ __ __ __ ------------------------------------- $ 143
_,_--
---
$ 172 _
Project
Project Engineer
$ 172
- $ 198
Other Direct Charges
Black Line Plots
$2.00 per page
Outside Reproduction
Cost + 15%
Mylar Plots
$12.00 per sheet
Automation & Electrical Materials
Cost + 25% (+tax)
Subconsultant Fees
Cost + 10%
Technology Fee
$30/Day
Color Plots
$5.00 per page
Travel and Related Subsistence
Cost + 15%
Standard Mileage Rate
IRS Rate per mile
Airplane Mileage Rate
GSA Rate per mile
2025/2026 Fee Schedule
Bill Rate Ranges
Subject to change
Resident Engineer
$
223
- $
238
Sr. Associate Architect
$
239
$
254
Sr. Associate Engineer_
$
212
$_254
Sr. Associate Land Surveyor
$
235-
$
250
Sr. Automation Specialist
____ __ __ ____ _ _ _- _ _ ------------- -____ ,-------------------------------------------- $ _
200
_ ----- _
$
_ _
215
__,_-----------
Sr. Automation Technician
$
175
$
190
Sr. CAD Tech
$
138
$
153
Sr. Construction Manager
$
233
$
248
Sr. Consultant / Principal -in -Charge _
$
307
- $
335
Sr. Land Surveyor
$
247
- $
262
Sr. Plan Check Engineer
$
193
$
208
Sr. Principal Designer
$
162
- $
211
Sr. Principal Engineer I - III
$
239
$
307
Sr. Project Designer
m _�..._. _. — _________
$
143
$
185
Sr. Project Engineer
$
185
$
223
Sr. Resident Engineer
$
239
$
254
Survey Assistant_
m....
$
133
$_
14868
Survey Manager
$
253
$
268
Survey Technician I - V
$
152
- $
211
Technical Writer I - IV
$
150
$
165
Survey Crew Rates - Regular
O_ne-Man Field
$
231
- $
246
Two -Man Field
$
312
$
327
Three -Man Field
$
417
$
432
Two -Man - HDS
$
373
$
388
Survey Crew Rates - Prevailing Wage
One -Man Field
$
278
- $
293
Two -Man Field
$
415
$
430
Three -Man Field
$
570
$
585
Electrical - Prevailing Wage
Electrician $ 238 - $ 253
Building and Construction Inspector - Prevailing Wage
BCI Construction Inspector $ 176 - $ 191
Forensics Engineering / Expert Testimony Fee Schedule Available Upon Request.
Expenses, such as special equipment, shipping costs, travel other than by automobile, parking expenses, and permit fees will be billed at the actual cost plus 15%. If the client requests, or the client's schedule requires work to be done on an overtime basis, a multiplier of 1.5 will be applied to the stated rates for weekdays for daily hours in excess of 8 as well as weekends, and a multiplier of 2.0 for daily hours in excess of 12 and holidays. If the client requests field services to be provided outside of normal working hours, a multiplier of 1.5 will be applied to the stated rates. For prevailing wage projects, if the client requests field services to be provided on any given Sunday, a multiplier of 2.0 will be applied to the stated rates; on or around an observed holiday, other rates may be applied. Survey Crews and Automation Field staff are billed portal to portal. A minimum charge of four hours will be charged for any Automation Field Service calls outside of normal working hours. The stated rates are subject to change, typically on an annual basis. (effective 71112025)
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD ilding 394 Addition
F)MPOC, Califomic
A space technology company operating at Vandenberg Space Force Base (VSFB) needed additional storage space adjacent to Building 394, located outside the fence if Space Launch Complex 6. The project added a prefabricated metal building on •t 1614'1 - 1 1 � III 1:: 2 '1•i - I[
A 4 N 22 , r" it •A - a 4 a - q . a 11 as so
The site's proximity to the ocean and the slope rising from the ocean required the new building to account for Exposure D wind conditions. The design also included a gap between the existing and new buildings to support roof drainage. The interior floor slab needed to support heavy forklift loads, and the work included a sloped approach slab for rolling door access and porch slabs outside two man -doors.
Reference: Steve Rarig, President/Managing Part
calculations for permit and construction.
000usignEnvelope ID: 4AEo487A-5aaF-889E-8uAarr0EC033uoCo The following organizational chart illustrates our personnel who will provide structural services. We have selected personnel who are not only experts in their respective disciplines but also have extensive experience collaborating o similar projects. The team members listed will be principally responsible for working with the City. Our team will be I by Stuart Tomeny, PE. Hooman Tavallali, SE will serve as Principal -in -Charge, and Marshall Pihl, SE will provide QA/QCI
000usignEnvelope ID: 4AEo487A-5aaF-889E-8uAarr0EC033uoCo Civil Engineer:
— California, No. 61406;
— Washington, No. 62544#
� Structural Engineer:
— California, No. 5101
— Colorado, No. 42873
— Washington, No. I5440
— Oregon, No. GOX87PE
— Texas, No. 1211D
Evaluator CAL EMA, No.
67614
Master ofScience, Civil
Engineering (Structural),
Columbia University, New
York
• Bachelor ofEngineering
Science, Pacific Lutheran
University, Tacoma,
Washington
• Bachelor ofScience, Civil
Engineering, Columbia
University, New York
Professional Affiliations
• Professional Member,
International Code Counci
American Concrete Institull
• American Institute of Stele
Mr. PihI has provided structural engineering services since 1984. He is knowledgeable in design and analysis for different types of new construction, renovations, and repair of structural damage due to water, rot, fire, and natural and steel structures. In addition to structural design and analysis, he has been involved in a number of projects as a structural engineering expert witness and consultant concerning various insurance claims and repairs.
Ventura Parking Garage Seismic Evaluation, Ventura, California: Cannon was selected to provide structural engineering services related to the evaluation and repair of a beach -front parking structure. The structure has experienced extensive cracks, corrosion, and concrete spalling due to the harsh exposure. Cannon's evaluation process followed the ASCE 41 process.
The three-tier process identifies performance expectations for the evaluation and retrofit of existing buildings. The process identifies weaknesses in the vertical and lateral force sL)rstems of the structure. From this yroces-is, a Yerformance-based reyair plan is developed. The City of Ventura will evaluate the construction cost for the repairs to determine a long-term plan for the parking structure. Mr. Pihl served as Project Manager.
California: The City of El Monte (City) currently uses an abandoned building for storage purposes. A portion of the building's roof collapsed. Cannon conducted a specifications for the repair of the roof. Mr. Pihl served as Principal -in -Charge / QA/ Vandenberg Space Force Base Residential Fire Report, Vandenberg, California: A that caused structural damage. Cannon visited the site and visually evaluated the structure to determine which parts were salvageable. After the site visit and review of available existing construction drawings of the structure, Cannon developed a report identifying the extent of the damage and scope of repair. Mr. Pihl served as Project Manager.
Mr. PihI has served as Project Manager or Structure Representative on the following projects:
CIA
• Ventura Police Headquarters Seismic Evaluation, Ventura, California • Conversion of Naval Facilities - (BEQ) 33612, Camp Pendleton, Area 33, Californi-2.
000usignEnvelope ID: 4AEo487A-5aaF-889E-8uAarr0EC033uoCo Professional Registration
Civil Engineer, California,
68454
Bachelor of Science, Civil
Engineering, Structural
Engineering (ARCE),
Mr. Tomeny has over 23 years of experience in structural and civil engineering design for public and private infrastructure projects across California. Before joining Cannon, he served as Principal Engineer at Solid Structures Engineering, leading design and construction support for more than 1,600 projects. His work included the design of bridges, retaining walls, pump stations, and municipal buildings, as well as seismic and wind analysis, foundation design, and structural review during construction. Stuart coordinates with public agencies and design teams to develop efficient, code -compliant structural systems using steel, concrete, masonry, and timber. He is dedicated to providing stable structures to the community for anticipated conditions and the lifetime of the structure.
Structural Assessment and Shoring Design for Water Utilities Office Downey, California: The City of Downey (City) needed structural engineering services to structure with partially reinforced CMU perimeter walls. A fire compromised the roof, interior framing, and portions of the building's lateral force resisting system.
The City selected Cannon to provide a preliminary coordination and hazard survey, structural observation and damage assessment, temporary shoring design, and construction support during temporary shoring installation. Mr. Tomeny served as Mr. Tomenyhas served asProject Manager orSenior Associate onthe following • Maintenance Yard Roof Repair, Ventura, California
° Ventura O|ivasAdobe Wall Repair, Ventura, California
° SterbaseAir Separation Unit(Asu) - Retaining Wall Foundation Design Revision Tb|FCDrawings For Increased Launch Loads, Starbase,Texas ° VSFB Building Foundation Design for Building 39O East Bay Addition, Lompoc, California
• Civic Center Main Parking Lot Expansion OPProject, Irvine, California ° Civic Center Main Parking Lot Expansion - EV Charging Station Design, Irvine, California
� Civic Center Secured Parking Lot Foundation Design for Shade Structures, Irvine, California
° VSFB Building Foundation Design for Building 398 East Bay Addition, Lompoc,
000usignEnvelope ID: 4AEo487A-5aaF-889E-8uAarr0EC033uoCo Professional Registration
Engineer -in -Training, NCEES
13-992-71
Education
Master of Science, Structural
Engineering, University of
Arizona, Tucson, Arizona
Bachelor of Science, Civil
Engineering, University of
Arizona, Tucson, Arizona
Professional Affiliations I
- American Society of Ciy.L
Engineers
As Project Engineer, Mr. Kuhlman will work as part of the design team responsible for the majority of initial design, plan preparation, development of technical s!,aecifications and estimates and data comyilation. In addition he will assist with the development of proposals and fee estimates; provides field observation and generate reports; conduct project research; deliver communications to clients, under supervision of the project manager.
Transportation Services -Storage Building Roof Collapse Repair, El Monte, California: The City of El Monte (City) currently uses an abandoned building conducted a site visit to investigate the roof collapse. We provided construction documents and specifications for the repair of the roof. Mr. Kuhlman served as Project Engineer.
Parking Lot. In addition to improving access control, the lot is being upgraded with new storm drains and water quality best management practices facilities. requirements, and utility coordination. Mr. Kuhlman served as Structural Project Mr. Kuhlman has served asProject Engineer onthe following projects:
Software Skills 9 Structural Assessment and Shoring Design for Water Utilities Office Downey, •AutoCAD California
" Enerca|c ° BLDGPM735,Complete Building Renovation, Naval Air Station, Pt. Mugu, = Ansys California
° Structural Integrity and Complete Seismic Requirement Assessments, M Motel and Budget Inn, BMonte, California
° MRARMaintenance Shop Project, Denver, Colorado
° Lake Forest Zone 4E|Toro Tank land ZRehabilitation Project, Lake Forest, California
* Jed Smith 1, McCoy, and Calabasas Tank Rehabilitation Project, Calabasas, California
Docusign Envelope ID: 4AED487A-5BBF-889E-82AB-FF6EC6332BCD Andrew A. Tardie
Vice President/Project Manager
[email protected]
Mr. Tardie will be the principal in charge of assessing the project goals and establishing and implementing the procedures to obtain these goals.
As a geologist for LOR Geotechnical Group, Inc., since 1999, Andrew Tardie has been involved in all phases of geotechnical projects, ranging from initial site investigations to inspection and testing of soils/materials within the field and laboratory during construction for both the public and private sectors. Mr. Tardie has performed hundreds of geotechnical, geologic, and environmental investigations throughout the Inland Empire.
This work has included geophysical surveys, slope investigations, liquefaction analysis, seismic hazard analysis, including fault surface rupture, and rock fall analysis. He has proposed on, planned, supervised, and conducted geotechnical projects including hillside investigations, flat land explorations, and earthwork monitoring projects in Riverside, San Bernardino, Orange, Los Angeles, and San Diego Counties. Specialized detail in Mr. Tardie's experience has included logging exploratory borings and trenches, obtaining and documenting field samples, percolation and infiltration feasibility testing, pavement evaluation, and subsequent geotechnical report writing. Mr. Tardie holds a B.A. degree in Geology from California State University, San Bernardino and is a licensed Professional Geologist and Certified Engineering Geologist in the State of California.
Mr. Tardie is a member of the Geological Society of America (GSA), the Association of Environmental and Engineering Geologists (AEG), South Coast Geological Society (SCGS), and the Inland Geological Society (IGS).
FIRM
LOR Geotechnical Group, Inc.
I all Lae�III Is] P1
B.A. degree in Geology from California
State University, San Bernardino
REGISTRATIONS
PG 10144
CEG 2794
AFFILIATIONS
Mr. Tardie is a member of the
Geological Society of America (GSA),
the Association of Environmental and
Engineering Geologists (AEG), South
Coast Geological Society (SCGS) and
the Inland Geological Society (IGS).
YEARSININDUSTRY
28 years
YEARS W/CURRENT FIRM
27 years
000usignEnvelope ID: 4AEo487A-5aaF-889E-8uAarr0EC033uoCo Matt
Samar,
ARC FLASH SDI
Matt has provided electrical engineering expertise to education, healthcare, municipal and commercial facilities throughout Southern California. His design experience includes new buildings, central plant upgrades, infrastructure assessments and renovations. He has been responsible for overseeing projects from design through construction' research and application of building, electrical codes, calculations, equipment selection, sizing, project scheduling, specification writing, design document review, and punch list observations. Along with his extensive knowledge in commercial electrical engineering design, Matt also brings experience from other project types including public and private educational facilities.
Acushnet, Carlsbad, CA
* Tenant Improvements for existing facility at Carlsbad ° New Q\8O8-sfzstory—cnro&5hd|a"dTenant|mpmvements
Scripps LaJolla MOB, La Jolla CA*
° New 7-storyMedical Office Building . The new MOB consisted vfabasement level for Radiology and imaging, 11t floor GI labs and offices, 2,d floor Cath Labs, and 3rd thru 6' floor medical offices and specialty suits
Crenshaw MOB — Los Angles (A*
° New a\nnn-sfz-storv—Core & Shell and Tenant improvements Retina Center — Chula Vista CA*
= Major modernization ufexisting building for American Eye Associates Intuit Inc -Tenant Improvement — San Diego CA*
° Major tenant improvement for Intuit Inc atTorrey Santa rsnd San Diego CountyAdninbtratimnCenter-SanDiego CA*
~ $1o0million major system remodeling
Psychiatric Hospital mf San Diego County, San Diego CA* ° Major system remodeling
Genea|Atomic building G95, San Diego CA
° Tenant improvements for office spaces inbuilding ays
Genea|Atomic building G97,Sen Diego CA
~ Tenant improvements for office spaces inbuilding 597
Nummina Building 6 San Diego, CA *
* Tenant improvement for office spaces in building 6
(~ denotes projects completed prior »vjoining Arc Flash San Diego)
000usignEnvelope ID: 4AEo487A-5aaF-889E-8uAarr0EC033uoCo RYAN
HEATHER, P.E.
CAREER SNAPSHOT
Mr. Heather's career knthe Mechanical HYAC'Plumbing and Process Engineering industry has been overy broad career. Hehas not specialized inany one aspect, but rather focused unlearning all aspects ofengineering approached toperform the next project too higher standard and expectation. This thought process isnot only o goal for the Company, but for Mr. Heather's extremely high personal set standard.
KNOWLEDGE
Mr. Heather's arsenal ofengineering includes, but bnot limited to; variable air volume (V/\Y) systems
air and water cooled VRV(YRF)systems
4'pipechilled water (CHYY)
heating hot water (HHYV)systems
condenser water (COYY)systems
single zone packaged and split systems
site and building natural gas distribution systems
domestic cold and hot water systems
sanitary waste and vent systems
compressed air systems
lab gas systems
doionizod (D|)water systems
medium temperature hot water (k^THYV) systems
steam and condensate return systems
chemical drain systems
general building and garage exhaust systems
tail -pipe exhaust systems
kitchen hood exhaust systems
process hood exhaust systems
vehicle exhaust systems
These systems are at Mr. Heather's disposal for any number of project types and applications.
RESPONSIBILITIES
Mr. Heather's responsibilities involve all aspects ofoproject from load calculations tuclient, project and team management. Not only isMr.
Heather well versed with mechanical and plumbing management, he isvery adept 10overall team management with full A&Eservices. He knows what other disciplines need sohocan anticipate what is needed 10streamline project cohesiveness.
Mr. Heather has been managing projects since 6'monthsinto his career and maintains many relationships he has had since that time. He performs onthe job montohngand training for engineers, designers and drafters working onMr. Heather's team. |1isMr. Heather's philosophy the more the team msowhole understands the project and tasks nthand, the higher quality the work will beachieved and the faster the end product will boproduced.
000usignEnvelope ID: 4AEo487A-5eoF-889E-8uAorr0EC033ooCo EDUCATION: Rick Aiken, the Vice President of Los Angeles/Urban Studio, directs the WHA LA Urban Mixed -Use Design Studio. With over35 years of experience and a Bachelor ofScience inArchitecture
large body ofwork in and around the West Coast, Rick has become leader University ufOregon
in urban design with afocus on higher density and mixed -use projects, His Eugene Oregon ' expertise has led tmspeaking engagements tVshare his skills and insight in the area of urban infiU design. It is RioKs finn belief that the scale of these projects is bigger than one person and ultimately it is tenacity, discipline, and good communication that result insuccess.
REGISTRATIONS: With his diversitypf experience imcommmercial, institutional, and residential projects, Rick integrates different architectural and planning philosophies Licensed Architect: �Q\N[,OR
while achieving programmatic and economnk objectives of the client.
National Council ofArchitectural Rick encourages balanced responsibilities and skiUsets for those on his team.
Registration Boards, NCAR8 He identifies staff best suited to each project and keeps them involved from conceptual design through production. Ultimately this provides a better flow of information and builds stronger client relationships. ����NQ��N������~ �������������U������~
AFFILIATIONS: .�..���������� PROJECT EXPERIENCE:
American Institute ofArchitects BLU
Building Industry Association Urban Mixed Use
Long Beach Camber of Commerce Intracorp I Long Beach, CA Jefferson Square
Mixed Use
Thomas Safran & Associates I Los Angeles, CA
Phsma
Urban Apartments
Wood Partners I Santa Ana, CA
������~� ------- Trisha Gardens atStation District
P: 949.622�8784 Thwnhomes
E: ricka@vvhaincrom Related Companies of California I Santa Ana, [A kilki ARCHITECTS PLANNERS. DESIGNERS
000usignEnvelope ID: 4AEo48rA-5aoF-88VE-8uAarr0EC033ooCo �EDUCATION: Peter possesses over 25 years of experience in architecture and design. He California State Polytechnic Universityserved in the United States Army om 1990to 1994and was honorably
discharged. His project experience ranges from tenant improvements to Pomona,[A
residential mu|d4ami|yconstrucdon, including all phases from schematic design toconstruction administration.
As amen&mr principal of WHA's Urban Studio Peter focuses on podium, inuldfam&ly, and mixed -use projects.
Peter has been instrumental in integrating 31K4 into the design workflow at VVH4, which results in more accurate and complete documentation, as ����������������~
"°�`=�"�="°�~=°=°�=^ well as increased efficiencies. He is currently over -seeing the construction of Licensed Architect: [A several podium and on -grade projects totaling over $100 million, working hand in hand with clients and contractors,
National Council nfArchitectural
Registrations Board, NCARB
�F��NR��0������~ ��������������������.
���.�...�������� PROJECT EXPERIENCE:
Building Industry Association Canby Woods
Affordable Apartments
Thomas Safran and Associates I Contra Costa, CA
Danville Hotel
Mixed Use
Castle Companies I Danville, CA
Phsma
Podium Apartments
Wood Partners I Santa Ana, CA
CONTACT: Coastline Ventura
P� �949�J2R759 � � Apartments
ARCHITECTS PLANNERS, DESIGNERS