Cities Index.
04. CIP No. 26-09 - Apprv Plans & Specs - Authorize Solicitation of Bids - Traffic Sig at Firestone Blvd & Pangborn Ave.

Downey City Council
July 28, 2026

Document
04. CIP No. 26-09 - Apprv Plans & Specs - Authorize Solicitation of Bids - Traffic Sig at Firestone Blvd & Pangborn Ave.
Meeting
July 28, 2026
Body
Downey City Council
Pages
8
Original file
28 KB
Text extracted from the city's file for reading and search. Open the original on lf.downeyca.org. That file is the official record.

Item No. 4.

TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
FROM: OFFICE OF THE CITY MANAGER
BY: MATTHEW BAUMGARDNER, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER DATE: JULY 28, 2026

APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO SOLICIT SUBJECT: CONSTRUCTION BIDS FOR PROPOSED TRAFFIC SIGNAL INSTALLATION AT

FIRESTONE BOULEVARD AND PANGBORN AVENUE, CAPITAL IMPROVEMENT PROJECT (CIP) NO. 26-09

EXECUTIVE SUMMARY
The City Council will consider approving plans and specifications and authorizing the solicitation of construction bids for the proposed traffic signal installation at the Firestone Boulevard and Pangborn Avenue intersection, Capital Improvement Project (CIP) No. 26-09, to enhance traffic safety and operations at this intersection.

RECOMMENDATION
That the City Council:

1. Approve plans and specifications and authorize solicitation for construction bids for the proposed traffic signal installation at Firestone Boulevard and Pangborn Avenue, CIP No. 26-09; and,

2. Authorize the procurement of City -furnished materials for this project.

BACKGROUND
Traffic volumes at the Firestone Boulevard at Pangborn Avenue intersection have steadily increased over the past several years due to an increase in development at this location. Two fast food restaurants and a day care center are located at the northwest and northeast corners, and a small retail center is located on the south side of the intersection. The area to the north of this intersection consists of residential neighborhoods and Rio San Gabriel Elementary School is located on the west side of Pangborn Avenue at Gotham Street As such, Pangborn Avenue accommodates a daily traffic volume of approximately 6,000 vehicles per day.

Left turn movements are currently prohibited in the southbound direction at Firestone Boulevard, requiring motorists traveling southbound on Pangborn Avenue destined for the 1-605 Freeway and other points east to turn right at Firestone Boulevard and proceed west to Woodruff Avenue to complete a U-turn in order to travel eastbound on Firestone Boulevard. Alternatively, some motorists traveling southbound on Pangborn Avenue divert to Ardine Street or Fostoria Street to access Newville Avenue in order to utilize the traffic signal at the Firestone Boulevard and Stewart and Gray Road-Newville Avenue intersection to turn left on Firestone Boulevard. The cut - through traffic on Ardine Street and Fostoria Street has led to complaints from residents on both streets due to the relatively heavy traffic volumes in the eastbound direction. The allowance of southbound left turns on Pangborn Avenue at Firestone Boulevard would help address this neighborhood intrusion issue by altering the traffic pattern to encourage motorists to remain on Pangborn Avenue to access Firestone Boulevard, but would require signalizing the Firestone Boulevard at Pangborn Avenue intersection.

In addition, requests have been received from the public for the installation of a marked crosswalk on Firestone Boulevard at Pangborn Avenue, which would also require the signalization of the intersection in order to provide a protected pedestrian crossing across Firestone Boulevard at this location.

The aforementioned traffic issues related to traffic volume increase, neighborhood intrusion and pedestrian safety at the Firestone Boulevard and Pangborn Avenue intersection prompted staff to conduct a traffic signal warrant study at this intersection to determine if the installation of a traffic signal could be justified at this location. The warrant study was subsequently completed in March 2025 and demonstrated that a traffic signal is warranted at this intersection.

Based on the results of the warrant study, staff subsequently budgeted the funding and proceeded with the selection of a consultant for the design and preparation of plans, specifications, and estimate for the proposed traffic signal at the Firestone Boulevard at Pangborn Avenue Intersection.

ANALYSIS
The plans (Attachment B) and specifications for the project are complete and the City is ready to advertise the project for construction.

The work involves the installation of City -furnished traffic signal poles and mast arms, controller cabinet and electrical service equipment; ADA-compliant pedestrian push button assemblies, vehicle and pedestrian indications, luminaires, conduits, pull boxes, conductors, fiber optic communications equipment, cable splicing; removal of a portion of the raised median on Firestone Boulevard to allow southbound left -turn movements, curb construction, minor pavement work, accessible ramp construction, pavement striping and markings and signage; and traffic control. In order to help expedite the project schedule and reduce costs to the extent possible, the City is planning to procure certain materials, which typically require long lead times for fabrication and coordination with utility agencies, such as the electrical service pedestal and traffic signal poles and mast arms.

Construction is estimated to begin in January 2027 and completion is estimated by July 2027. This project is categorically exempt from the provisions of the California Environmental Quality Act (CEQA) under section 15301 (c) existing facilities.

CITY COUNCIL PRIORITIES
Quality of Life, Safety & Infrastructure

FISCAL IMPACT
Approval of the recommended actions will result in an expenditure of $599,285, a breakdown of which is provided below.

Description Amount
Design and Preliminary Engineering $57,285
Construction Contract (Estimated) $300,000
Contingencies (10%) $30,000'
City -Furnished Materials $137,000

Construction Inspection and Materials Testing $60,000
Construction Engineering and Contract Administration $15,000 Total Estimated Project Cost: $599,285
Funding for the project included in the adopted FY 2026-2027 Capital Improvement Program kC|P\ budget, is shown below:

Account
No. Funding Source Amount
Total Available Budget: $234,457
An updated project cost summary will be provided at the time of project award based on actual bids received. An appropriation of additional funds will be requested for the project o1that time, as nennssary. Staff anticipates that there will beavailable Measure R(Fund 56) fund balances inmultiple C|Pprojects ovai|ab|ea1theiirneofnontraot award. Hovvever, at this time, there are sufficient budgeted funds for the purchase of the project materials with long lead times.

Attachments
Attachment B - Firestone Blvd at Pangborn TS Installation Plans.pdf

BELL GARDENS
SOUTH
GATE
STEWART & �JGRAY RD
0 IMPERIAL H W Y
zr_
mmmim

FIRESTONE BLVD
F
ik
�zn

NORWALK
0-IL-CT LOCA TION
moom
CIP 26 09 NEW TRAFFIC SIGNAL
PARAMOUNT ��NS'FALLA1`1113N AT
s�PEFHRIESFONE B01-ILEVARD AND PANGBORN
AV E 1\1
............... . .. . ...... "I'll", ........... . . — — — — ----------------- .......... ........... . ........

CITY OF DO NE

DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION
................................................ . ............ ............... lll-.------ll-- --- - --------- CAPITAL IMPROVEMENT PROJECT NO. 26-09

NEW TRAFFIC SIGNAL INSTALLATION AT FIRESTONE BOULEVARD ATTACHMENT A

LOCATION MAP

AND PANGBORN AVENUE

GENERAL NOTES:

1. TRAFFIC SIGNAL AND HIGHWAY LIGHTING EQUIPMENT, AND INSTALLATION THEREOF

SHALL CONFORM TO LATEST CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES CA MUTCD DATED 2026 CALTRANS STANDARD PLANS AND SPECIFICATIONS, LATEST 2024 EDITION, STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION(SPPWC), LATEST EDITION, THIS PLAN, AND THE SPECIAL CONDITIONS.

2. LOCATION OF UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR

SHALL POTHOLE TO DETERMINE THE EXACT LOCATION AND VERIFY ALL CONDITIONS ON THE JOBSITE PRIOR TO ORDERING POLES. HAND DIG FOUNDATIONS UNTIL CLEAR OF OBSTRUCTION. COORDINATE POLE INSTALLATION WITH OVERHEAD UTILITY AND SUBSTRUCTURE OWNERS. CONTACT UNDERGROUND SERVICE ALERT AT (800) 422-4133, 48 HOURS PRIOR TO CONSTRUCTION.

3. CONTRACTOR SHALL OBTAIN ALL NECESSARY UTILITY PERMITS AND NOTIFY ALL UTILITY COMPANIES A MINIMUM OF 48 HOURS PRIOR TO START OF CONSTRUCTION.

IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE ALL PHASES OF CONSTRUCTION WITH THE VARIOUS UTILITY COMPANIES INVOLVED.

IMPROVEMENTS,4. ALL EXISTING - 1 PLANT MATERIAL TO REMAIN WITHIN THE CONSTRUCTION PROPERLY 1 ADEQUATELY PROTECTED .1
DAMAGE DURING CONSTRUCTION. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RESTORE TO THE ORIGINAL CONDITION1' REPLACE IN KIND ANY

OF THESE EXISTING ITEMS THAT ARE DAMAGED OR DISTURBED IN ANY WAY AT NO COST TO THE CITY.

5. ALL NEW VEHICLE HEADS SHALL HAVE BACKPLATES WITH 2" YELLOW RETROREFLECTIVE STRIP ON THE FACE AROUND THE PERIMETER OF THE BACKPLATE.

6. TRAFFIC SIGNAL EQUIPMENT LOCATIONS SHOWN ARE PRELIMINARY. CONTRACTOR

SHALL OBTAIN ENGINEER'S APPROVAL FOR FINAL TRAFFIC SIGNAL EQUIPMENT LOCATIONS PRIOR TO EXCAVATING FOR POLE AND CABINET FOUNDATIONS.

7. ALL WIRING SHALL BE MARKED (TAGGED) WITHIN THE CONTROLLER CABINET FOR PHASE IDENTIFICATION.

8. (XXXX) INDICATES DETECTION ZONE ASSIGNMENT IN THE CONTROLLER CABINET.

9. CONDUCTOR SCHEDULE IS PROVIDED AS AN INSTALLATION GUIDE ONLY. IT IS THE

CONTRACTOR'S RESPONSIBILITY TO PROVIDE THE CORRECT CONDUCTORS REQUIRED FOR THE INTENDED OPERATION.

10. THE LOCATIONS OF ALL PROPOSED SIGNAL RELATED EQUIPMENT ARE APPROXIMATE AND MAY BE CHANGED TO SUIT FIELD CONDITIONS AS DIRECTED BY THE ENGINEER.

11. DETECTION ZONES FOR THE VIDEO DETECTION SYSTEM ARE SHOWN AS A GUIDELINE ONLY AND ARE NOT A PHYSICAL INSTALLATION.

12. CONDUIT SHALL BE MIN. 3" SCHEDULE 40 PVC AND PULL BOXES SHALL BE #6, UNLESS INDICATED OTHERWISE. TRAFFIC SIGNAL PULL BOX COVERS SHALL BE INSCRIBED "TRAFFIC SIGNAL" AND COMMUNICATIONS PULL BOX COVERS SHALL BE INSCRIBED "COMMUNICATIONS". SEE THE SPECIAL CONDITIONS.

C-C _wu w
IU�LIrC� ��OR;KS' �E-'IPPA3RP-hT�MrE�N���
Ann ... , l �

CONSTRUCTION PLANS

NEW TRAFFIC SIGNAL INSTALLATION
FIRESTONE BOULEVARD AID PANGIB) 0 DDN
AB

AGGREGATE BASE
MSE

MECHANICALLY STABILIZED EARTH

13. ALL NEW VEHICLE INDICATIONS SHALL HAVE 12" LED LENSES AND SHALL HAVE NON—PIXELATED APPEARANCE. SEE THE SPECIAL CONDITIONS.

AC

ASPHALT CONCRETE
NIC

NOT IN CONTRACT
ANG
ANGLE
NTS

NOT TO SCALE

14. ALL NEW PEDESTRIAN PUSH BUTTONS AND SIGNS SHALL BE TYPE B (2" BUTTON) AP

ANGLE POINT
NW

NORTHWEST
PUSH BUTTONS AND AND SIGNS SHALL BE R10-3b PEDESTRIAN SIGNAL PUSH BUTTON INFORMATION (SYMBOL) SIGNS.

ASPH

ASPHALT
O.C.

ON CENTER, OWNERS CONDUIT
AVE
AVENUE
OG

ORIGINAL GROUND

15. ALL NEW PEDESTRIAN INDICATIONS SHALL BE LED COUNTDOWN PEDESTRIAN HEADS BEG
BEGIN
PCC

PORTLAND CEMENT CONCRETE/
PER THE SPECIAL CONDITIONS.

BW

BACK OF WALK

POINT OF COMPOUND CURVATURE

16. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE CAB

CRUSHED AGGREGATE BASE
P/L

PROPERTY LINE

AND LOCATION OF ALL UNDERGROUND FACILITIES, AND TO PROTECT THEM FROM C/L

CENTER LINE
PROP

PROPOSED
DAMAGE. THE CONTRACTOR SHALL BEAR THE TOTAL EXPENSE OF REPAIR OR REPLACEMENT OF ANY UNDERGROUND FACILITIES DAMAGED DURING CONSTRUCTION.

C&G

CURB & GUTTER
PVI

POINT OF VERTICAL INFLECTION

17. ANY MODIFICATION OF OR CHANGES TO APPROVED PLANS MUST BE APPROVED BY CLR
CLEAR
RW

RECLAIMED WATER
THE ENGINEER.

CONST

CONSTRUCT
SS

SANITARY SEWER
D/W

DRIVEWAY
SCE

SOUTHERN CALIFORNIA EDISON

18. ALL CONDUIT NOT SHOWN FOR REUSE SHALL BE ABANDONED. ALL PULL BOXES NOT SHOWN FOR REUSE SHALL BE REMOVED.

ESMT

EASEMENT
SE

SOUTHEAST
EOP

EDGE OF PAVEMENT
SD

STORM DRAIN
EL

ELEVATION
STA

STATION
EX\EXIST

EXISTING
ST
STREET
FF

FINISHED FLOOR
STD

STANDARD
FO

FIBER OPTIC CABLE
SPPWC

STANDARD PLANS FOR
FS

FINISHED SURFACE

PUBLIC WORKS CONSTRUCTION
FL

FLOW LINE
TBD

TO BE DETERMINED
GB

GRADE BREAK
TC

TOP OF CURB
H
HEIGHT
TD

TOP OF DITCH
HMA

HOT MIX ASPHALT
TF

TOP OF FOOTING
HP

HINGE POINT
TLP

TOP OF LEVELING PAD
INV
INVERT
TRANS

TRANSITION
JPCP

JOINTED PLAIN
TW

TOP OF WALL
L

CONCRETE PAVEMENT LENGTH
TYP

TYPICAL
LOL

LAYOUT LINE
UGU

UNDERGROUND UTILITIES
MAX

MAXIMUM
VAR
VARIES
MBGR

METAL BEAM GUARD RAILING
WV

WATER VALVE
MH

MANHOLE
W

WIDTH, WATER
MIN

MINIMUM

VICINITY MAP

NOT TO SCALE
��P.I9: 1�[i�1*607Oki i�[iP►�
SHEET NO. 1 TITLE SHEET
SHEET NO. 2 DETAIL SHEET
SHEET NO. 3 NEW TRAFFIC SIGNAL INSTALLATION PLAN AT

FIRESTONE BOULEVARD AND PANGBORN AVENUE
AT
AVENUE
m
a110 i1ikoffl 1 lWoll arelo1:1 •'�

ALL UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER OR OTHERS AND THOSE SHOWN ON THE RECORDS EXAMINED ARE INDICATED WITH THEIR APPROXIMATE LOCATION AND EXTENT. THE

OWNER BY ACCEPTING THESE PLANS OR PROCEEDING WITH IMPROVEMENTS PURSUANT THERETO AGREES

TO ASSUME LIABILITY AND TO HOLD UNDERSIGNED HARMLESS FOR ANY DAMAGES RESULTING FORM THE

EXISTENCE OF UNDERGROUND UTILITIES OR STRUCTURES NOT REPORTED TO THE UNDERSIGNED, NOT

INDICATED ON THE PUBLIC RECORDS EXAMINED, LOCATED AT VARIANCE WITH THAT REPORTED OR SHOWN ON RECORDS EXAMINED. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO

PROTECT THE UTILITIES OR STRUCTURES SHOWN AND ANY OTHER UTILITIES OR STRUCTURES FOUND AT THE SITE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURES CONCERNED BEFORE STARTING WORK. CONSTRUCTION CONTRACTOR AGREES THAT IN

ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL

BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE

COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT

THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING

HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN

PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE

PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL.

UNAUTHORIZED CHANGES AND USES

CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED

CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND

COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING THE SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL

BE MADE TO APPLY CONTINUOUSLY AND NOT TO BE LIMITED TO NORMAL WORKING HOURS, AND

CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND INDEMNIFY AND HOLD DESIGN

PROFESSIONAL HARMLESS FROM ANY LIABILITY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION

WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL.

MINIMS1
1'I 111 Im.11ll t

UTILITY AND AGENCY INDEX

UNDERGROUND SERVICE ALERT
(800)
422-4133

CITY OF DOWNEY

WATER & SEWER
(562)
904-7202

CITY OF DOWNEY

TRAFFIC ENGINEER
(562)
904-7110

CITY OF DOWNEY
MAINT. SERVICES
(562)
904-7194

LA COUNTY DEPT OF HEALTH SERVICES (DNS)

DAN BACANI
(626)
430-5290

CALIFORNIA DEPT OF HEALTH SERVICES (DNS)

WEI CHANG
(818)
551-2044

LA COUNTY DEPARTMENT OF PUBLIC WORKS

MICHAEL TJAN
(626)
458-1700

LA COUNTY DEPARTMENT OF PUBLIC WORKS

MANUEL ALARCON
(626)
458-7169

LA COUNTY FLOOD CONTROL DISTRICT

MARYAM ADHAMI
(626)
458-3129

LA COUNTY SANITATION DISTRICT

TOMMY SONG
(562)
699-7411
EXT. 1205

METROPOLITAN TRANSPORTATION AUTHORITY

PETE SERDINES
(213)
626-4455

CENTRAL BASIN MUNICIPAL WATER DISTRICT

ISABELLE GUIDO
(323)
201-5541

METROPOLITAN WATER DISTRICT

KEN CHUNG
(213)
217-7670

SOUTHERN CALIFORNIA GAS COMPANY

ERIC ROMERO
(714)
231-0456
SOUTHERN CALIFORNIA EDISON (NON —TRANSMISSION)

ERNESTO CHAVEZ
(562)
903-3183

SOUTHERN CALIFORNA EDISON (TRANSMISSION LINES)

ROBERT CHAVEZ
(909)
592-3748

FRONTIER COMMUNICATIONS (VERIZON)

ERNIE YBARRA
(626)
777-1000

PHILLIP OLIVAS
(626)
331-0155

TIME WARNER CABLE

ERNEST CHANG
(562)
259-2015

TIME WARNER TELECOM

BART VARWEY
(909)
456-3693

ABOVENET COMMUNICATIONS

KEVIN SULLIVAN
(714)
236-8502

CHARTER COMMUNICATIONS

STEVE FEAR
(626)
430-3338
LEVEL 3/WILTEL COMMUNICATIONS

ROGER WEATHERS
(720)
888-5688
NextG NETWORKS

RON HERRERA
(909)
593-9700

QWEST COMMUNICATIONS

PAT SLANEY
(714)
936-4898
SBC

MARCELLA CORDOZA
(310)
515-4370
SPRINT

JOE HEALY
(714)
781-7048

VERIZON/MCI

DON BECKERMAN
(626)
666-3526

BP (ARCO) PIPELINES

ROD STREED
(562)
499-2216

PACIFIC PIPELINE SYSTEM, LLC

JIM JACOBY
(562)
728-2020

PARAMOUNT PIPELINES

STEVE PEYTON
(562)
531-2060
EXT. 2751
TORRANCE LOGISTICS CO., LLC

ELEANOR MARX
(310)
221-2914

SPECTRUM

ARIEL FATALLA
(714)
375-6717

CROWN CASTLE

JEFF ROGERS
(951)
232-5268
Ift
0 i
W
i
n
/
co
n
i
0 rn
/
W
co
a_
i
0 0
rn
41 cn
0 O
n
0 co
i7
3 O
0 i
0 i
0 v
c
0 0
Q
v
I
W

LOAD SCHEDULE: FIRESTONE BLVD AT PANGBORN AVE
BUS AMPS: 100A MCB
MAIN SIZE/TYPE: 10OA-2P SERVES: GENERAL SYSTEM
VOLTS/PHASE: 120/24OV, 1PH, 3W + G MOUNTING: SURFACE
SECTIONS: 1 LOCATION: FIRESTONE BLVD AT PANGBORN AVE
CKT

VA/PHASE
WIRE
BKR
BKR
WIRE

VA/PHASE
CKT

DESCRIPTION
P
P

DESCRIPTION
NO.

A
B
SIZE
AMP
AMP
NO.

A
B
NO.
1 TRAFFIC SIGNAL
4,800 #6 50 1
1 30
#10 21438
INTERSECTION SAFETY LIGHTING 2
3 1 30
#10 "' 2,438
INTERSECTION SAFETY LIGHTING1 4
5 6
•
2,438 1 2,438 SUBTOTAL

TOTAL PHASE A - VA
7,238
AMPS
30 TOTAL PHASE B - VA
2,438
AMPS
10 TOTAL DEMAND

TOTAL PNLBRD - VA
9,676 9,676 VA
AMPS
40 40 A

CONTINUOUS

PIANO HINGE

FOR EXTERIOR

DOOR AND

DEAD FRONT
PANEL

TEST SWITCH

MOUNTING
PANEL

CONTACTOR -
MAIN

BONDING
JUMPER

BONDING
JUMPER

GROUNDING
ELECTRODE —
It
2 1

GROUNDING

ELECTRODE
ULTRAVIOLET —RESISTANT SURFACE PLASTIC
WINDOW
SNoN1E I SNo�2E
11►
EltTRAL •I
x"
BUS -
COVER

NAMEPLATE

TEST BYPASS
FACILITY —

TRAL LUG

PADLOCK -
HASPS
WWI

PEUU )WINDOWS

MAIN BONDING
JUMPER

CONTINUOUS

PIANO HINGE

DEAD FRONT

PANEL LATCH
11,01111419
millivilUmawbkm

CONDUIT

GROUNDING

ELECTRODE
SERVICE LANCHOR BOLTS: 5/8" 0 MIN x 18"
FRONT VIEW CONDUIT GALV., 4" — 90' BEND (4 REQ'D)

FOR PHOTO ELECTRIC CELL DIAGRAM SEE APWA STANDARD
PLANS FOR PUBLIC WORKS CONSTRUCTION No. 403-1.
1'-10.25"
5/8" 0 HOLE (TOTAL 4)
0 LINE SERVICE ENTRANCE
I
I

LOAD CONDUIT ENTRANCE

GROUNDING

ELECTRODE

LOCATION BASE
TYPE III—CF SERVICE

EQUIPMENT ENCLOSURE
N.T.S.

C
9 SIDE VIEW

RECOMMENDED SERVICE
to ENTRANCE CONDUIT

LOCATION
)NTINUOUS

ANO HINGE
240 V, SIGN

ILLUMINATION

LANDING
LUGS

TEST SWITCH

MOUNTING
PANEL
GROUND
CLAMP
"A"
FOR SIGNAL MAST —ARM MOUNTED:

CITY —FURNISHED VIDEO

DETECTION CAMERAS
CITY —FURNISHED 6X1 %"

ALUMINUM POLE
1 "x1.5" THREADED NIPPLE

STRAIN RELIEF CONNECTOR WITH

GROMMET DRILL AND TAP BOTTOM
OF SIGNAL ARM. INSTALL 1" TYPE
"LB" FITTING.

INSTALL YELLOW REFLECTIVE

PAINT ON MEDIAN NOSE

REMOVE EXISTING CURB

AND PLANTING/CONCRETE
PAVING

CONSTRUCT FULL -DEPTH HOT

HIX ASPHALT TO EXISTING
THICKNESS + 1"
(MINIMUM 8-INCHES)
GRADE TO CONTINUE CROWN.

ME'
1 .1

REMOVE AND CONSTRUCT CURB PER SPPWC STD PLAN TYPE
A1
-6 MATCH EXISTING HEIGHT AND WIDTH.

SEE CURB REPLACEMENT DETAIL

FOR SLOT PAVEMENT

MOVE MEDIAN NOSE BACK
BY "A", DIMENSION ON PLAN

MEDIAN NOSE DETAIL
N TS

SAFTEY LIGHTS
1 RIGID CAMERA MOUNT SB29—RCM
(VERTICAL OR HORIZONTAL INSTALLATION)

CAMERA MAST ARM MOUNT
N.T.S.

CONDUff

HOUSING
m
:L)
V
0 7-

- i A
6"x6##
(150 x 150 mm) LEXAN
\AElMNG WINDOW
�-HANDLE

CIRCUIT

BREAKERS
INSIDE

HASP OR

LOCK AS TRANSFER SWITCH INSIDE

REQUIRED 'TEST SWITCH INSIDE

GENERATOR
INLET
70 "1111
""�PCC FOUNDATION
FRONT

SERVICE CONDUIT LOAD CONDUIT

CU GROUND ROD
L5/8"x8' (16x2400 mm)
L A
#2 THHN

STRANDED CU
11 METER

PERCH HINGED
(METER BY COVER
'31)B I pD\

OTHERS)
G

LANDING
LUGS
HANDLE-,. 0

REMOVABLE
METER #14 STRANDED CU--j
SOCKET r�
�mF
100A/2 POLE

SERVICE DISCONNECT

EXTERNAL PHOTOCELL

MOUNT ON SAFETY LIGHT

OR FIRST FIXTURE
GROUND

GENERATOR

INLET, NEMA
L5-30R
OFFO

AL D TRANSFER
SWITCH, 55A
TYP E 3
i2�EE TYPE 1 FOR

NOTES AND DIMENSIONS

STANDAR
403 0 2r,
T F
.......... I
0o

CONDUCTOR SCHEDULE A
❑e❑e❑e❑e❑ee❑e
©000000
• DROP CABLE0000000

CONDUIT
®mm®m®®
©©©©©©©
Ak ALL CONDUCTORS ARE NEW UNLESS

OTHERWISE NOTED
EX. FO CONDUIT &
INTERDUCTS, WITH 48
SMFO—DISTRIBUTION
u
Q0
0 —
(212U) ; j f 230' TO
X—WALK
- --- --- ---
(212L)
CONSTRUCTION NOTES:

Master Overhead Sign
• Per CA-MUTCD
• Double -Sided Sign with Box Frame
(6) Street Name
12" Uppercase & 9" Lowercase (typ.)
3M Diamond Grade
White Retroflective Letters
(Highway Series Font)
3M Diamond Grade
Retroflective Sheeting
with Ultraviolet Protective Overlay
R = 5.6" (Color Blue)
Colored City Logo
(Dia. = 6.65")

0.4" White
t 3M Diamond Grade
� Retroflective Border
18"
City of Downey Firestone Blvd
Orange "D"
(Pantone 1655C) - 72" - 96"
Height = 4.75"

1.4" Uppercase & 1" Lowercase ©Street Suffix
3M Diamond Grade 12" Uppercase & 9" Lowercase (typ.)
White Retroflective Letters 3M Diamond Grade
(Highway Series Font) White Retroflective Letters
(Highway Series Font)

FIRESTONE BOULEVARD
INSTALL CITY —FURNISHED 332L CONTROLLER CABINET COMPLETE WITH 2O70LX CONTROLLER WITH SWARCO Omni —Ex SOFTWARE. CONTRUCT NEW CABINET FOUNDATION PER CALTRANS STD. PLAN NO. ES —EC. INSTALL EVP AND CITY —

FURNISHED VIDEO DETECTION SYSTEM, CABINET COMPONENTS PER MANUFACTURER'S INSTRUCTIONS. CONTRACTOR SHALL PROVIDE ALL AUXILIARY EQUIPMENT AS NECESSARY TO PROVIDE THE INTENDED OPERATION AS SHOWN.

FURNISH AND INSTALL FIBER PATCH PANEL, DISTRIBUTION UNIT WITH SPLICE

CASSETTES, PATCH CORDS, CONNECTORS, FIBER OPTIC SWITCH/ETHERNET

SWITCH AND POWER SUPPLY TO ESTABLISH COMPLETE DATA COMMUNICATION PER CITY SPECIFICATIONS. SEE THE SPECIAL CONDITIONS.
�3 CONSTRUCT FOUNDATION FOR TYPE III—CF SERVICE PER CALTRANS STD. PLAN RSP ES-2E. INSTALL CITY —FURNISHED TYPE III—CF SERVICE ENCLOSURE ON NEW FOUNDATION. SEE LOAD SCHEDULE AND TYPE III SERVICE EQUIPMENT ENCLOSURE DETAIL ON SHEET 2 OF 3. CONTACT SCE SERVICE PLANNER MARTIN IBARRA AT (562) 754-5011 AT LEAST 72 HOURS IN ADVANCE TO ENERGIZE. ® INSTALL 3" SCHEDULE 80 PVC CONDUIT WITH J" POLY PULL ROPE PER SCE REQUIREMENTS AND WORK ORDER DESIGN PLAN. COORDINATE INSTALLATION WITH SCE SERVICE PLANNER MARTIN IBARRA AT (562) 754-5011 AT LEAST 48 HOURS PRIOR TO CONSTRUCTION.

CONSTRUCT CABINET FOUNDATION FOR SP SERIES CABINET (CLARY) AND INSTALL BATTERY BACK—UP SYSTEM (CLARY SYSTEMS MODEL SP1250LX OR EQUAL) AND BYPASS SWITCH. CONNECT TO SIGNAL CONTROLLER CABINET PER MANUFACTURERS' SPECIFICATIONS.
© FURNISH AND INSTALL FIBER OPTIC SPLICE ENCLOSURE,
SPLICE ONE STRAND FROM THE 6 SMFO DROP CABLE
TO UNUSED STRAND FROM THE 48 DISTRIBUTION
CABLE FOR DATA COMMUNICATION. COIL 50' OF FIBER
OPTIC CABLE INSIDE PULLBOX. INSTALL DUPLEX SFPIN
10—GIGABIT SWITCH IN FO HUB CABINET ON LAKEWOOD PLAN PREPARED BY:

BLVD AT BLVD ANDWHERE FO ISTRANDEON 48 D STRIUOBUTION NNECT TO CABLE Wl LLDAP LINKED TO THIS INTERSECTION LANDS. SEE SPECIAL Engineerir CONDITIONS. 17-1 U^nnI
W
z
W
Q
z
ry
O DET 38
(50')
z

Q TYPE VII(R)
n
R1-1
"FIRESTONE 9400","PANGBORN 11100"
n INSTALL CITY —FURNISHED VIDEO DETECTION

CAMERA ON TRAFFIC SIGNAL MAST ARM

PER CAMERA MAST ARM MOUNT DETAIL ON
SHEET 2, CABLE AND CABINET EQUIPMENT
PER MANUFACTURERS' SPECIFICATIONS.
® INSTALL NEW TOMAR EVP DETECTOR. SEE
THE SPECIAL CONDITIONS.
�g FURNISH AND INSTALL SIGN, TYPE AND SIZE AS NOTED, PER CITY OF DOWNEY STD. DRAWING NO. 22. INSTALL SIGN ON TRAFFIC SIGNAL MAST ARM OR POLE OR NEW POST AS INDICATED.
10 CUT BACK EXISTING MEDIAN NOSE, CONSTRUCT NEW MEDIAN NOSE AND PAVEMENT RESTORATION PER MEDIAN NOSE DETAIL SHOWN ON SHEET 2. 11 CONSTRUCT ADA RAMP PER CURRENT SPPWC STD. PLANS, CASE AND TYPE AS NOTED.
12 CONSTRUCT 4" PCC CONCRETE PAD 15'x7'5" (APPROX. 113 SQ. FT.). 13 REMOVE CONFLICTING STRIPING AND PAVEMENT MARKINGS.
14 INSTALL STRIPING DETAIL AND/OR PAVEMENT MARKING AS SHOWN, PER CALTRANS STD PLAN NO A20A — A24G. SEE THE SPECIAL CONDITIONS. 15 INSTALL 12" THERMOPLASTIC WHITE CROSSWALK OR LIMIT LINE.

CROSSWALK SHALL BE 10' IN WIDTH (INSIDE TO INSIDE) UNLESS SHOWN OTHERWISE.
16 REMOVE EXISTING SIGN, TYPE AS INDICATED, AND POST.
17 RELOCATE STREET NAME SIGNS TO TRAFFIC SIGNAL POLES AS INDICATED. 60'
12' , 18' 1 18' , 12'
1 SERVICE FEED POINT
' PP# 1262760E

FH CITY UTILITY DIVISION TO RELOCATE FIRE
HYDRANT. CONTACT CITY, UTILITY DIVISION AT
562-904-7202, FOR SCHEDULING PRIOR TO
CONSTRUCTION.
© PROTECT IN PLACE.

CB INSTALL CONDUIT INTO EXISTING PULL BOX.

DETAIL "A"
ALL 12" INDICATIONS
POLE SCHEDULE ■
No.

STANDARD

LUMINAIRE
LED

VEHICLE SIGNAL MOUNTING
PED
SIGNAL

APS PPB
R.S.N.S.

POLE LOCATION
(SEE DETAIL "A")

REMARKS
TYPE
POLE
HEIGHT
LUM.

M.A.

SIG.

M.A.

MAST ARM
POLE
MTG.
0 QUAD
ARROW
E
B
C
A
29-5-100
30'
12'
45'*
183W

MAS, MAS, MAS
SV-1—T
SP-1—T
—
—
—
"Pangborn Ave"

SEE PLAN

2.5'
—
B
1—A
10'
—
—
—
—
TV-1—T
—
6 S
RT
—
—

12.0 2.5'
—
C
17-3-100
30'
12'
20'
183W
MAS
SV-1—T
SP-1—T
6 S
LT
"Firestone Blvd"

12.0'
—

2.5'
—
rn'N
15TS
30'
15'
—
183W
—
SV-1—T
SP-1—T
4 W
RT
—
—

12.0'

2.5'
1—
fF29-5-100
30'
12'
50'
183W

MAS, MAS, MAS
SV-2—TA
SP-2—T
4/2
W/S
LT/LT
"Pangborn Ave"

SEE PLAN
6'16-3-100
30'
—
20'
183W
MAS
SV-2—TA
SP-1—T
2 S
RT
"Firestone Blvd"

SEE PLAN
6' '
—
■ ALL EQUIPMENT IS NEW.
* MODIFY SIGNAL MAST ARM TO LENGTH SHOWN.
** SEE CITY OF DOWNEY MASTER OVERHEAD SIGN DETAIL
N
0 w
z
F-
;r1
GREEN
ARROW
DETAIL "B"
ALL 12" INDICATIONS
DETAIL "C"
1 PROPOSED PHASE DIAGRAM

GROUP A

GROUP B
�

PROTECTED
4 � I
z
01 02
03 04

PROTECTED
NOT
NOT
z
USED
USED
05 06
07 08
1 1 ,
I I I
j _,! I y
SS , >
__(6J2L)
(6J2L)
230' TO4 (6J2U)
X— WALK
f.... ®® .... . _
M
NEW VIDEO DETECTION ZONE, 6'x6'

UNLESS OTHERWISE NOTED

PROPOSED EVP DETECTOR
—� PROPOSED VIDEO DETECTION
CAMERA
_ PROPOSED OVERHEAD REFLECTORIZED

STREET NAME SIGN (RSNS)

SIGN LEGEND
R3-6(CA)
(30"x36")
50' TYPE C
TYPE C DIR. OF TRAVEL 6" WHITE STRIPE
DETAIL "D"

NO SCALE
R61-7(CA)
(36"x30")
USE
R9-3BP
(18%12")
R9-3
(24%24")
SCALE: 1" = 20'
41 0
0 I
Q
z
I
/
0 0
rn
/
W
q
I
0 0
rn
/
rn
c
0 0
a_
a�
0 a�
a�
0 0
O
/
0 v
0 0
/
Q
v
I
W
-N
0 n
0 U
N
L
t�

← All documents from this meeting