Cities Index.
agenda-report Comment Letter to the Notice of Preparation for the Strategy to Advance Flood Protection, Ecosystems and Recreation along the San Francisco Bay Project

East Palo Alto City Council
June 7, 2022

Document
agenda-report Comment Letter to the Notice of Preparation for the Strategy to Advance Flood Protection, Ecosystems and Recreation along the San Francisco Bay Project
Meeting
June 7, 2022
Body
East Palo Alto City Council
Original file
121 KB
Text extracted from the city's file for reading and search. Open the original on eastpaloalto.iqm2.com. That file is the official record.

EAST PALO ALTO

CITY COUNCIL

STAFF REPORT
DATE: June 7, 2022
TO: Honorable Mayor and Members of the City Council
VIA: Patrick Heisinger, Interim City Manager
BY: Glen March, Senior Engineer
Amy Chen, Community & Economic Development Director
Humza Javed, City Engineer
SUBJECT: Comment Letter to the Notice of Preparation for the Strategy to Advance Flood Protection, Ecosystems and Recreation along the San Francisco Bay Project Recommendation
It is recommended that the City Council direct the City Manager to transmit the final comment letter to the San Francisquito Creek Joint Powers Authority (SFCJPA) to serve as the City’s official comments to the NOP for the Project.

Alignment with City Council Strategic Plan
This recommendation is primarily aligned with:

Priority No. 1: Enhance Public Safety and Emergency Preparedness Priority No. 2: Enhance Economic Vitality
Priority No. 4: Improve Public Facilities and Infrastructure Priority No. 6: Create a Healthy and Safe Community
Background
The SFCJPA is a regional government agency composed to the cities of East Palo Alto (City), Menlo Park, and Palo Alto, the San Mateo County Flood and Sea Level Rise Resiliency District and the Santa Clara Valley Water District. The City’s Mayor Ruben Abrica is currently the Board Chairperson.

The Project is a multi-benefit project to: (1) protect communities to reduce the risk of flooding due to coastal flooding and sea level rise; (2) enhance and restore ecosystems; and (3) improve trails and shoreline access in the project area.

The SFCJPA prepared the NOP (Attachment 2) as required by the California Environmental Quality Act (CEQA). The NOP was released on April 22, 2022. Comments to the NOP are due June 15, 2022.

The purpose of the NOP is to allow agencies to comment on the scope and content of the environmental information which is germane to each agency’s statutory responsibilities in connection with the proposed Project.

After receipt of comments, the SFCJPA will initiate the conceptual engineering phase. As part of the conceptual engineering phase, the SFCJPA will consider comments from to the NOP in developing the conceptual engineering design and project description.

Future completion milestones for various tasks identified in a preliminary project schedule are as follows:
· Initial Geotechnical Investigation - January 2023
· 30% Engineering Design - June 2023
· Draft Project Description - August 2023
· Draft Environmental Impact Report - Early 2024
The Project is divided into two reaches within the City. The North of Bay Road Reach extends from the University Avenue/Bay Trail intersection to Bay Road. The North of Bay Road reach encroaches on the 2020 Bay Road development property, EPA Waterfront development property, Mid-Peninsula Open Space property, and Infinity Auto Salvage property. The South of Bay Road Reach extends from Bay Road to the San Francisquito Creek. The South of Bay Road Reach encroaches on The Landing property, several other properties, and is near Martin Luther King, Jr. Park. Nearly all cross sections in the NOP show the Bay Trail reconstructed on top of the levee. The SFCJPA intends to implement the South of Bay Road reach prior to the North of Bay Road Reach.

Nearly all levee alignment options in the City are constructed within a band of land that extends from the shoreline to 100 feet inland of the shoreline. The Ravenswood Business District (RBD) developments are planning recreational uses and shoreline access improvements in the 100 feet shoreline band. The SFCJPA is working with the RDB developers to coordinate improvements within the 100 feet shoreline band.

The shoreline band is regulated by the San Francisco Bay Conservation & Development Commission (BCDC). The Project and portions of the RBD developments within the 100 feet shoreline band will require BCDC permits. Under the McAteer-Petris Act, BCDC has certain requirements and goals for improvements in the 100 feet band, which are found on the BCDC website. <https://bcdc.ca.gov/> BCDC typically does not permit buildings within the 100 feet shoreline band. The planned RBD building footprints are outside of the 100 feet shoreline band as new buildings within the 100 feet shoreline band are inconsistent with the shoreline access and water-oriented uses that are essential to the public welfare of the Bay Area.

The SPCJPA presented the Project to the City’s Public Works and Transportation Commission on May 18, 2022.

Analysis
Staff supports the Project.

The attached comment letter documents the City’s concerns about the information contained in the NOP.

General Plan and Ravenswood Business District Specific Plan The City is responsible for regulating land use within its boundaries.

The Project levees and improvements are proposed within the RBD Specific Plan (Specific Plan) area. As identified in the General Plan, the RBD is high priority for the City for future redevelopment. The General Plan and Specific Plan recognize the value of the Bay, specifically the Ravenswood Open Space Preserve and the Palo Alto Baylands Natural Preserve. The City’s policies place great importance on the connected public open spaces within this area and making sure that new development is compatible and provides benefits to the community. The City has concerns about the impact of the proposed levee on future development and the ability to implement the Specific Plan goals. The parks and trails provide space for active and passive recreation and enhance the visual appearance of the City. The levee may limit the ability to realize these goals. The General Plan also values community involvement. Policy 1.7 encourages public involvement in every aspect of park and open space acquisition, design, construction and programming. The City requests that the SFCJPA work with East Palo Alto to design a levee system that will not limit the ability to implement the City’s goals and policies regarding the RBD. The City would appreciate greater coordination to ensure that both the SFCJPA and City’s goals are met, including presentations to the City Council regarding how the City’s concerns are being addressed, not less than quarterly. The coordination should also include greater public involvement.

As part of the planning application process, the City will require, as a condition of approval, certain landowners to dedicate construction, maintenance, and public access easements for the levee and Bay Trail. The location of the easements will consider recreational uses and shoreline access improvements in the 100 feet shoreline band proposed by the landowners.

Staff is concerned that the proposed levee alignment will be inconsistent with the landownerprovided easements.

The Specific Plan includes the Loop Road that connects to University Avenue to Bay Road. A proposed levee alignment shows the Loop Road, Bay Trail, and levee in a narrow corridor between the University Village subdivision and the railroad right-of-way. Staff is concerned that the proposed improvements will not fit within the narrow corridor.

A levee alignment in the North of Bay Road reach shows the Bay Trail relocated onto the 2020 Bay Road property, EPA Waterfront property, and Infinity Auto Salvage property. Staff is concerned that high-speed bicycles on the relocated Bay Trail may be inconsistent with the pedestrian areas proposed as part of the recreational uses and shoreline access improvements on the properties.

Parks Master Plan and Martin Luther King Jr. Park Master Plan Proximity and access to high-quality parks, green spaces, and recreation areas have positive and long-lasting impacts on individual and community health. Research confirms that living close to a park significantly increases how frequently residents exercise, and reduces cardiovascular disease, and childhood obesity rates.

Unfortunately, the City’s park system is scarred with the historic impacts of inequitable investment and racialized land-use decisions that have concentrated environmental injustice and lack of public investment in the City compared to neighboring cities. The City is “park poor.”
For today’s population of close to 30,000 people, the City currently only has approximately 24 acres of accessible public park land. To achieve the minimal goal of 3.0 park acres per 1000 people, the Parks Master Plan has the challenge of identifying an additional 66 park acres. The General Plan’s population projection for 2035 adds more than 7,000 new residents, increasing the total park area deficit in the future to 112 acres. Overall, the Bay Trail and the shoreline park opportunities identified as part of future developments are critical to ensuring the City provides the park and open spaces needed to ensure residents have options for recreation and improved physical and mental health and wellness.

The existing Bay Trail and its adjacent open spaces along the City's perimeter are critical public park resources for the community today. It is important for the levee improvement project to identify the trailheads and access points planned for the Bay Trail and to maximize the number of access points between the community and the new Bay Trail.

In addition, the open spaces and shoreline band areas identified in the RBD Specific Plan and Martin Luther King, Jr. Park Master Plan are critical future opportunities to meet the community’s park needs today and in the future. The planned improvements at Martin Luther King, Jr. Park include the expansion of MLK to the west towards the Bay. Staff is concerned that the Project will not consider the future park improvements.

Throughout many phases of community engagement efforts for the future of East Palo Alto’s shoreline, a common theme has included the opportunity to expand public access as part of the redevelopment and infrastructure improvements. The design of the 3-to-1 levee slopes along the City-facing perimeter should include opportunities for adjacent properties to back-fill and meet the new Bay Trail grade, creating an accessible, gradual slope that maximizes the area available for usable public access and recreation. Those areas could also be designed to provide more open space and recreational uses.

Climate Action Plan
The levee is critical to support the City’s planned resiliency and adaptation to sea level rise.

The City is concerned about how the SFCJPA will implement the levee to ensure critical infrastructure is fully protected from sea level rise and mitigates anticipated impacts into the future. The levee design shall adhere to the ’Citys Climate Action Plan, <https://www.cityofepa.org/econdev/page/climate-action-plan> concurrently under public review. Design standards shall ensure guidance provided by the California Ocean Protection Council (OPC) and San Mateo County’s Sea-Level Rise Vulnerability Assessment are followed. <http://seachangesmc.org/vulnerability-assessment/> According to San Mateo County’s Assessment, the City of East Palo Alto has 335 acres of land at risk in the baseline scenario, 714 acres in the mid-level scenario, and 992 acres in the high-end scenario. Nearly 60 percent of East Palo Alto’s population and almost all of the City’s wetlands are vulnerable to sea level rise under the mid-level scenario. Critical infrastructure and community-serving facilities included energy and water infrastructure, local roadways, schools, emergency shelters, and parks would also be impacted by sea level rise. Design considerations of the planned levee shall result in infrastructure which equates to resiliency across all sea level rise risks including increased wave action, rising groundwater tables and saltwater intrusion, increased erosion (i.e., landward shoreline retreat) and changes in sediment supply in lands pertaining to the proposed project.

Vehicle Access to Levee and Bay Trail
Vehicle access points to the top of the levee should be provided for maintenance vehicles, police vehicles, fire vehicles/equipment, and ambulances. Staff is concerned that levee may not be sufficiently wide to allow vehicles to safely drive on the levee due to the steep embankment. Staff is concerned that the levee/Bay Trail may not be sufficiently wide to allow for vehicles, pedestrians and cyclists to pass moving and/or parked vehicles. Staff is also concerned that the levee may have an inadequate number of access points for vehicles. Staff is concerned that the levee pavement section may not be designed for vehicle traffic. Staff is concerned that the geometric design of the Bay Trail may not accommodate vehicles, especially near the PG&E poles and towers and the existing Bay Trail alignment near Runnymede Street.

Pedestrian, Cyclists, and Persons with Disabilities Access to Bay Trail Along the Bay shoreline, BCDC’s land use authority relates primarily to public access. The Commission bases the approval of a project primarily on whether or not the development provides maximum feasible public access, consistent with the project. The City shares the BCDC’s goals regarding providing maximum feasible access to the shoreline. The City’s priorities regarding public access are identified in the 2007 East Palo Alto Bay Access Master Plan. Staff is concerned that the maximum feasible public access to the Bay shoreline is provided.

Existing access points to the Bay Trail are located at Daphne Way, O’Connor Street, Cypress Street, Garden Street, Runnymede Street, Weeks Street, Bay Road, and Martin Luther King, Jr. Park, etc. The existing access points should be reconstructed by the Project. Staff is concerned that the Project maintain existing access points to the Bay Trail.

The landowners in the RBD development plan to significantly increase the shoreline access on their properties.

New and feasible access points to the Bay Trail should be considered at Beech Street, Stevens Avenue, Fordham Street, Rutgers Street, and Tulane Avenue which terminate near the existing or relocated Bay Trail. Staff is concerned that new access points may not be considered near the existing or relocated Bay Trail.

Staff is concerned that ADA compliant access will not be provided.

Contaminated Soil and Groundwater
Contaminated soil and groundwater are well-known and documented issues in areas from the Weeks Street terminus, north along East Palo Alto’s shoreline to Fordham Street. Additionally, imported topsoil in northern properties of the City from Demeter Street to Fordham Street have been documented to include PCBs and other constituents of concern. Staff recommends that the following Permitting agencies shall be included in design review for these areas to ensure appropriate remediation: California Department of Toxic Substances Control, the Environmental Protection Agency, and the Bay Area Air Quality Control Board.

A levee alignment crosses the Infinity Auto Salvage property, as well as other properties that may have contaminated soil and/or ground water. If the Project acquires any property in fee and the eventual property owner is the City, staff is concerned about the City’s liability associated with the contaminated soil and/or groundwater on the properties.

Tidal Marsh Overlooks on Bay Trail
An overlook can provide a place for cyclists and pedestrians to stop and clear the Bay Trail, view the marshes, sit at a bench and rest, and read educational and information signage. Staff is concerned that the Project will not provide overlooks for people to clear the trail, rest, and enjoy various amenities.

Lighting of Bay Trail for Public Safety
As part of the City’s public outreach effort for the City’s Park Master Plan, residents identified adding lighting to increase visibility at night as the most important and best means to address public safety concerns at parks.

Lighting on the Bay Trail will help address residents’ safety concerns and increase utilization of the Bay Trail in the City. Lighting would also benefit the cyclist safety as many commute to work via the Bay Trail before and after dark.

City Storm Drain Facilities
Storm drain facilities, including drainage pipes, outfalls, ditches, swales, retention basins, pump stations, and overland sheet flows convey storm water from the City to Bay. Staff is concerned that the Project may obstruct storm water or reduce the capacity of the facilities.

Minimizing Construction Impacts
Staff is concerned about impacts to the City during the construction of the Project.

Parking within the City is limited. The Project should provide on-site parking for all construction personnel, construction offices/trailers, and staging areas for materials and equipment. The City may implement a Resident Parking Permit program that would limit parking on streets to residents.

Staff is concerned about damage to its streets and impacts to traffic due to trucking and hauling, especially hauling of embankment material. Project shall adhere to the requirements of Municipal Code Section 8.28 including allowable haul routes determined by the Public Works Director.

Staging or lining up trucks before loading or offloading materials should take place on-site or on private property as a contract requirement. No staging of trucks will be permitted on City streets.

Staff is concerned about the construction noise disturbing residents. Hours of construction activity shall be limited to hours described in Municipal Code Section 15.04.125 unless further limited by the Public Works Director. For example, installing sheet piles may be limited to hours from 9 am to 4 pm. Any deviations from the allowable hours of construction activity shall be approved by the Public Works Director.

Staff is concerned about settlement of nearby structures due to construction activities. The Project should implement of settlement monitoring program to address settlement concerns, complaints, and claims.

Well planned Bay Trail detours will improve cyclists’ experience during construction. Staff is concerned that the design of detours may not be included in the construction contracts. The detour design should include creating Class II bikeways where Class II bikeways are not feasible.

Public Notices including door hangers, social meetings postings, or websites are essential to informing the public about changes to their daily life. The Project should develop a comprehensive public outreach plan for construction activities.

The Project should consider phasing construction within a reach as opposed to closing an entire reach for the duration of construction. As construction windows may be limited for environmental reasons, the construction contract should ensure the Bay Trail is useable when no construction is permitted due to environmental restrictions to the greatest extent feasible.

Stormwater pollution generated by the Project is a concern of the City. The construction contract should require daily sweeping of City streets, including haul routes, inlet protection, and site watering to minimize airborne dust.

Staff is concerned about the Contractor importing contaminated soil for construction. An independent lab should be hired by the SFCJPA to test material, as opposed to the Contractor sampling and testing the material.

City Permits
The Project will require City Permits, which may include the following:
· Encroachment Permit(s). (Municipal Code Sections 13.06.200 and 13.06.280) · Hauling /Oversize Load Transportation Permit(s) (Municipal Code Sections 8.28 and 10.36)
· Grading Permit(s) (Municipal Code Section 15.48)
· Tree Removal Permit(s) (Municipal Code Section 18.28) City Streets
The proposed levee is near the cul-de-sacs on Weeks Street, Runnymede Street, Garden Street, Cypress Street, Beech Street, and O’Connor Street. The cul-se-sacs are essential for allowing vehicles, especially fire vehicles/equipment, to turn around. Staff is concerned that the levee may adversely impact existing cul-de-sacs.

Any modifications to the City streets shall comply with the City’s design and construction standards, as well as the City’s adopted Green Infrastructure Plan. Green Infrastructure | City of East Palo Alto (cityofepa.org) <https://www.cityofepa.org/publicworks/page/greeninfrastructure> Storm Water Pump Station Improvements
The City will improve the Storm Water Pump Station (Pump Station) near O’Connor Street.

The improvements will include (a) installing a new above ground diesel fuel storage tank on the north side of pump station at the elevation of the existing Bay Trail; and (b) removing the existing underground fuel storage tanks on the east side of the Pump Station. Staff is concerned that the Project will not consider the future improvements at the Pump Station.

Bay Trail and Levee Maintenance
The portions of the existing Bay Trail within the City are maintained by the City, City of Palo Alto, and Mid-Peninsula Regional Open Space District. Staff is concerned about any increase in human resources and/or financial resources that would be necessary for the postconstruction maintenance of the Bay Trail and Tidal Marsh Transition Zones by the City.

The proposed 3:1 levee embankment side-slopes will be difficult for workers to safely maintain due to the steepness. Embankment side-slopes not steeper than 4:1 are industry standard (See Caltrans Highway Design Manual). If 3:1 side-slopes are required by the Project, staff is concerned that low to no maintenance plantings will not be installed on the side-slopes to minimize maintenance of the embankment slopes.

Future Levee Construction
Sea level rise may require an increase to top of levee elevation. Increasing the top of levee requires increasing the width of the levee embankment footprint. The City wishes to avoid filling the tidal marsh transition zone if the top of levee elevation must be increased. Permitting and construction of a project within the tidal marsh transition zones is more difficult than compared to a project on the landward side of the levee. Staff is concerned that adequate space on the landward side of the levee will not be provided for the additional embankment width required to increase the top of levee elevation, if required.

Levee Crossings at Bay Road and Railroad Crossings
The levee will pass over Bay Road and the Union Pacific Railroad tracks near University Avenue. The City is concerned about how the SFCJPA will implement the levee at Bay Road and the Railroad Crossing crossings including effectiveness and impact to the roads and railroads when deployed and not deployed.

Next Steps

If directed, the City Manager will transmit the comment letter, as modified by City Council, to the SFCJPA.

Fiscal Impact
There are no fiscal impacts associated with the City Council action described in the staff report.

Public Notice
The public was provided notice by making the agenda and report available on the City’s website and on a bulletin board located at City Hall: 2415 University Avenue, East Palo Alto.

Environmental
The action being considered does not constitute a “Project” within the meaning of the California Environmental Quality Act (CEQA), pursuant to CEQA Guideline section 15378 (b)(5), in that it is a government administrative activity that will not result in direct or indirect changes in the environment.

Attachments

1. SAFER Bay Project Notice of Preparation dated April 22, 2022

2. Draft Comment Letter to SAFER Bay Project NOP

← All documents from this meeting