October 3, 2022
Humza Javed, City Engineer
City of East Palo Alto
1960 Tate Street
East Palo Alto, CA 94303
RE: EPA City Council Chambers and Police Evidence Room – Separate the Offices from the Council Chambers to bid out the Offices.

Dear Humza,
I am pleased to provide a fee proposal to provide Architectural and Engineering Services to separate our completed construction documents into bid documents just for the offices and add a new door between the Council Chambers and the Offices, located where the Police Evidence room was located. Listed below are the different Engineering disciplines:
 Structural Engineering – Structus = $7,800.00
 Mechanical / Plumbing – H& M = $2,500.00
 Electrical Engineering – Zeiger = $4, 200.00
 AV Acoustical Eng. - Charles H. Salter = $4,500.00
 Architect- PPA = $21,950.00
Our team will have to remobilize to organize the re-start of this project. We also have to provide the following services which include the following:
 Confirm any new program changes to the spaces and document them.  Research current code requirements and update documents per code changes  Coordinate these changes amongst the team.
 Document these changes in the construction set.
 Meet with building and planning departments to confirm that team is meeting all recent changes in the code.
 Obtain building and Planning department approval.
 Bid the documents
 Assist in Construction Administration.

Therefore, our total fees are $40,950 (Forty Thousand Nine Hundred Fifty Dollars) Note: This proposal does not include the following:
 The project scope will be submitted to the building department as one package and will be constructed within a limited period. 311 Oak Street #331
OAKLAND, CA 94607
PHONE: (510) 912-8386
870 MARKET STREET, SUITE 757
SAN FRANCISCO, CA 94102
PHONE: (415) 233-8306
[email protected]
 Asbestos and/or Hazard Material investigation and design removal is not part of our scope.
 A soils report and survey are available for design purposes and if not, there is a need for these items
 Preliminary Cost estimates are per gross square foot cost only  Changes and modifications of the drawings at no fault of the Architect will be an additional service
 Meetings beyond the scope outlined above in the Scope of work.

Sincerely East Palo Alto City Engineer
Powell and Partners Architects Humza Javed

_______________________
Fred Powell, FAIA/NOMA