1 Lead Compliance Plan LS 1 LS $ 10,000 $ 10,000 $ 10,000.00 $ 10,000 $ 5,000 $ 5,000 10,000.00 10,000.00 $ 10,000 $ 10,000 2 Soil Sampling and Analysis LS 1 LS $ 50,000 $ 50,000 $ 25,000 $ 25,000 $ 15,000 $ 15,000 25,000.00 25,000.00 $ 30,000 $ 30,000 3 Progress Schedule (Critical Path Method) LS 1 LS $ 6,000 $ 6,000 $ 25,000 $ 25,000 $ 15,000 $ 15,000 10,000.00 10,000.00 $ 25,000 $ 25,000 4 Time-Related Overhead LS 1 LS $ 907,000 $ 907,000 $ 600,000 $ 600,000 $ 1,150,000 $ 1,150,000 500,000.00 500,000.00 $ 1,000,000 $ 1,000,000 5 Develop Water Supply LS 1 LS $ 20,000 $ 20,000 $ 25,000 $ 25,000 $ 15,000 $ 15,000 10,000.00 10,000.00 $ 40,000 $ 40,000 6 Construction Area Signs LS 1 LS $ 40,000 $ 40,000 $ 24,000 $ 24,000 $ 25,000 $ 25,000 25,000.00 25,000.00 $ 45,000 $ 45,000 7 Traffic Control System LS 1 LS $ 600,000 $ 600,000 $ 225,000 $ 225,000 $ 300,000 $ 300,000 300,000.00 300,000.00 $ 934,724.40 $ 934,724.40 8 Portable Changeable Message Sign LS 1 LS $ 40,000 $ 40,000 $ 40,000 $ 40,000 $ 75,000 $ 75,000 40,000.00 40,000.00 $ 60,000 $ 60,000 9 Temporary Striping (Paint) LF 19,980 20,830 $ 5 $ 104,150 $ 2 $ 41,660 $ 2 $ 41,660 2.00 41,660.00 $ 2.20 $ 45,826 10 Temporary Pavement Marking (Paint) SQFT 830 830 $ 20 $ 16,600 $ 5 $ 4,150 $ 5 $ 4,150 5.00 4,150.00 $ 6 $ 4,980 11 Temporary Pavement Marker EA 470 521 $ 10 $ 5,210 $ 7 $ 3,647 $ 6 $ 3,126 6.00 3,126.00 $ 7 $ 3,647 12 Channelizer EA 125 125 $ 50 $ 6,250 $ 85 $ 10,625 $ 100 $ 12,500 35.00 4,375.00 $ 55 $ 6,875 13 Alternative Temporary Crash Cushion EA 125 1 $ 10,000 $ 10,000 $ 6,000 $ 6,000 $ 8,500 $ 8,500 5,000.00 5,000.00 $ 7,500 $ 7,500 14 Temporary Railing (Type K) LF 3,350 3,330 $ 40 $ 133,200 $ 50 $ 166,500 $ 65 $ 216,450 20.00 66,600.00 $ 35 $ 116,550 15 Temporary Crash Cushion Module EA 98 98 $ 800 $ 78,400 $ 375 $ 36,750 $ 500 $ 49,000 200.00 19,600.00 $ 500 $ 49,000 16 Job Site Management LS 1 LS $ 180,000 $ 180,000 $ 75,000 $ 75,000 $ 100,000 $ 100,000 325,000.00 325,000.00 $ 125,000 $ 125,000 17 Prepare Storm Water Pollution Prevention Plan LS 1 LS $ 8,000 $ 8,000 $ 2,000 $ 2,000 $ 50,000 $ 50,000 5,000.00 5,000.00 $ 5,000 $ 5,000 18 Rain Event Action Plan EA 30 30 $ 500 $ 15,000 $ 215 $ 6,450 $ 500 $ 15,000 125.00 3,750.00 $ 500 $ 15,000 19 Storm Water Sampling & Analysis Day EA 12 12 $ 1,200 $ 14,400 $ 275 $ 3,300 $ 1,000 $ 12,000 425.00 5,100.00 $ 500 $ 6,000 20 Temporary Cover SQYD 10,000 10,000 $ 3 $ 25,000 $ 5 $ 50,000 $ 4 $ 40,000 3.00 30,000.00 $ 2 $ 20,000 21 Storm Water Annual Report EA 3 3 $ 3,000 $ 9,000 $ 500 $ 1,500 $ 1,000 $ 3,000 1,000.00 3,000.00 $ 2,000 $ 6,000 22 Temporary Hydraulic Mulch (Bonded Fiber Matrix) SQYD 9,996 10,000 $ 2 $ 15,000 $ 1.50 $ 15,000 $ 1.25 $ 12,500 1.25 12,500.00 $ 0.35 $ 3,500 23 Temporary Drainage Inlet Protection EA 16 16 $ 800 $ 12,800 $ 300 $ 4,800 $ 250 $ 4,000 100.00 1,600.00 $ 190 $ 3,040 24 Temporary Fiber Roll LF 1,972 1,980 $ 5 $ 9,900 $ 6 $ 11,880 $ 6 $ 11,880 3.00 5,940.00 $ 8 $ 15,840 25 Temporary Reinforced Silt Fence LF 710 710 $ 5 $ 3,550 $ 11 $ 7,810 $ 10 $ 7,100 10.00 7,100.00 $ 16 $ 11,360 26 Temporary Construction Entrance EA 4 3 $ 3,000 $ 9,000 $ 10,000 $ 30,000 $ 6,500 $ 19,500 1,000.00 3,000.00 $ 6,000 $ 18,000 27 Street Sweeping LS 1 LS $ 30,000 $ 30,000 $ 75,000 $ 75,000 $ 30,000 $ 30,000 5,000.00 5,000.00 $ 110,000 $ 110,000 28 Dewatering and Non Storm Water Discharge System LS 1 LS $ 60,000 $ 60,000 $ 250,000 $ 250,000 $ 25,000 $ 25,000 100,000.00 100,000.00 $ 150,000 $ 150,000 29 Temporary Concrete Washout EA 6 5 $ 3,000 $ 15,000 $ 2,500 $ 12,500 $ 500 $ 2,500 1,000.00 5,000.00 $ 6,000 $ 30,000 30 Remove Concrete Curb LF 2,120 1,990 $ 10 $ 19,900 $ 22 $ 43,780 $ 30 $ 59,700 15.00 29,850.00 $ 12 $ 23,880 31 Remove Concrete Sidewalk and Island SF 12,540 12,600 $ 5 $ 63,000 $ 6 $ 75,600 $ 10 $ 126,000 5.00 63,000.00 $ 3.70 $ 46,620 32 Clearing and Grubbing LS 1 LS $ 100,000 $ 100,000 $ 55,000 $ 55,000 $ 150,000 $ 150,000 200,000.00 200,000.00 $ 55,000 $ 55,000 33 Roadway Excavation (Type Z-2) (Aerially Deposited Lead) CY 620 1,405 $ 350 $ 491,750 $ 275 $ 386,375 $ 550 $ 772,750 320.00 449,600.00 $ 275 $ 386,375 34 Imported Borrow CY 7,000 9,100 $ 30 $ 273,000 $ 70 $ 637,000 $ 65 $ 591,500 20.00 182,000.00 $ 25 $ 227,500 35 (F) (B) Structural Excavation (Bridge) CY 167 167 $ 175 $ 29,225 $ 210 $ 35,070 $ 500 $ 83,500 500.00 83,500.00 $ 150 $ 25,050 36 (F) (B) Structural Backfill (Bridge) CY 133 133 $ 210 $ 27,930 $ 350 $ 46,550 $ 350 $ 46,550 200.00 26,600.00 $ 410 $ 54,530 37 Rock Mulch SQFT 2 260 $ 15 $ 3,900 $ 32 $ 8,320 $ 30 $ 7,800 5.00 1,300.00 $ 33 $ 8,580 38 Weed Germination SQYD 2 4,300 $ 13 $ 55,900 $ 1 $ 4,300 $ 1 $ 4,300 1.00 4,300.00 $ 1 $ 4,300 39 Soil Amendment CY 942 55 $ 170 $ 9,350 $ 50 $ 2,750 $ 50 $ 2,750 60.00 3,300.00 $ 50 $ 2,750 40 Packet Fertilizer EA 942 1,093 $ 2 $ 2,186 $ 1 $ 1,093 $ 1 $ 1,093 1.00 1,093.00 $ 1 $ 1,093 Item No. Unit Price (in
Figures)
Estimated
Quantity
Engineer's Estimate
Route 101 University Avenue Interchange Improvements
Bid Tabulation
Item Description Item Total (in
Figures)
Estimated
Quantity Unit Item Total (in Figures)
Unit Price (in
Figures)
Item Total (in
Figures)
MCM Construction, Inc. Viking Construction Company Gordon N. Ball, Inc. Beador Construction Company, Inc.
Unit Price (in
Figures)
Item Total (in
Figures)
Unit Price (in
Figures)
Item Total (in
Figures)
Unit Price (in
Figures)
US 101 University Avenue Bid Tabulation 1 3/15/2023
Item No. Unit Price (in
Figures)
Estimated
Quantity
Engineer's Estimate
Item Description Item Total (in
Figures)
Estimated
Quantity Unit Item Total (in Figures)
Unit Price (in
Figures)
Item Total (in
Figures)
MCM Construction, Inc. Viking Construction Company Gordon N. Ball, Inc. Beador Construction Company, Inc.
Unit Price (in
Figures)
Item Total (in
Figures)
Unit Price (in
Figures)
Item Total (in
Figures)
Unit Price (in
Figures)
41 Slow Release Fertilizer LB 251 188 $ 10 $ 1,880 $ 6 $ 1,128 $ 5 $ 940 2.00 376.00 $ 6 $ 1,128 42 Plant (Group A) EA 1333 1,339 $ 40 $ 53,560 $ 22 $ 29,458 $ 20 $ 26,780 16.00 21,424.00 $ 22 $ 29,458 43 Plant (Group U) EA 49 49 $ 300 $ 14,700 $ 260 $ 12,740 $ 250 $ 12,250 285.00 13,965.00 $ 280 $ 13,720 44 Plant Establishment Period (1 Year) LS 1 1 $ 35,000 $ 35,000 $ 36,000 $ 36,000 $ 36,000 $ 36,000 25,000.00 25,000.00 $ 50,000 $ 50,000 45 Wood Mulch (2") CY 124 240 $ 200 $ 48,000 $ 52 $ 12,480 $ 50 $ 12,000 60.00 14,400.00 $ 55 $ 13,200 46 Foliage Protector (Tree Staking) EA 124 49 $ 60 $ 2,940 $ 110 $ 5,390 $ 100 $ 4,900 180.00 8,820.00 $ 110 $ 5,390 47 Root Barrier LF 124 452 $ 20 $ 9,040 $ 16 $ 7,232 $ 100 $ 45,200 17.00 7,684.00 $ 17 $ 7,684 48 Control and Neutral Conductors (Armor Clad) LS 2 LS $ 7,500 $ 7,500 $ 12,000 $ 12,000 $ 15,000 $ 15,000 4,000.00 4,000.00 $ 11,000 $ 11,000 49 1" Remote Control Valve EA 2 2 $ 600 $ 1,200 $ 750 $ 1,500 $ 700 $ 1,400 500.00 1,000.00 $ 825 $ 1,650 50 1 1/2" Remote Control valve EA 6 3 $ 800 $ 2,400 $ 775 $ 2,325 $ 750 $ 2,250 510.00 1,530.00 $ 910 $ 2,730 51 2" Remote Control Valve EA 4 8 $ 1,000 $ 8,000 $ 875 $ 7,000 $ 850 $ 6,800 600.00 4,800.00 $ 960 $ 7,680 52 WeatherTRAK 36-Station Irrigation Controller (Pedestal Mounted) EA 1 1 $ 28,000 $ 28,000 $ 17,000 $ 17,000 $ 20,000 $ 20,000 20,000.00 20,000.00 $ 17,500 $ 17,500 53 Riser Sprinkler Assembly EA 1440 1,449 $ 50 $ 72,450 $ 26 $ 37,674 $ 25 $ 36,225 35.00 50,715.00 $ 28 $ 40,572 54 2" Gate Valve EA 1635 2 $ 600 $ 1,200 $ 755 $ 1,510 $ 750 $ 1,500 700.00 1,400.00 $ 825 $ 1,650 55 1" Plastic Pipe (Schedule 40) (Supply Line) LF 1635 5,460 $ 15 $ 81,900 $ 9 $ 49,140 $ 8 $ 43,680 4.00 21,840.00 $ 6 $ 32,760 56 1 1/2" Plastic Pipe (Schedule 40) (Supply Line) LF 1001 3,363 $ 20 $ 67,260 $ 10 $ 33,630 $ 9 $ 30,267 5.00 16,815.00 $ 6 $ 20,178 57 2" Plastic Pipe (Class 315) (Supply Line) LF 1423 1,172 $ 30 $ 35,160 $ 11 $ 12,892 $ 10 $ 11,720 15.00 17,580.00 $ 8 $ 9,376 58 8" Welded Steel Pipe Conduit LF 350 112 $ 350 $ 39,200 $ 360 $ 40,320 $ 350 $ 39,200 210.00 23,520.00 $ 260 $ 29,120 59 Move In/Move Out (Erosion Control) EA 1 1 $ 3,000 $ 3,000 $ 1,400 $ 1,400 $ 1,000 $ 1,000 1,000.00 1,000.00 $ 1,100 $ 1,100 60 Rolled Erosion Control Product (Netting) SQFT 29,800 6,800 $ 2 $ 13,600 $ 1.50 $ 10,200 $ 1 $ 6,800 1.00 6,800.00 $ 1.10 $ 7,480 61 Hydromulch SQFT 59,240 36,300 $ 1 $ 36,300 $ 0.25 $ 9,075 $ 0.20 $ 7,260 0.20 7,260.00 $ 0.20 $ 7,260 62 Hydroseed SQFT 59,240 36,300 $ 2 $ 72,600 $ 0.50 $ 18,150 $ 0.40 $ 14,520 0.40 14,520.00 $ 0.50 $ 18,150 63 Fiber Rolls LF 3,420 3,500 $ 5 $ 17,500 $ 6 $ 21,000 $ 5 $ 17,500 5.00 17,500.00 $ 4.70 $ 16,450 64 Compost CY 460 180 $ 30 $ 5,400 $ 115 $ 20,700 $ 100 $ 18,000 100.00 18,000.00 $ 110 $ 19,800 65 Class 2 Aggregate Base CY 403 410 $ 100 $ 41,000 $ 175 $ 71,750 $ 350 $ 143,500 250.00 102,500.00 $ 160 $ 65,600 66 Hot Mix Asphalt (Type A) TON 1,908 1,910 $ 150 $ 286,500 $ 180 $ 343,800 $ 200 $ 382,000 200.00 382,000.00 $ 215 $ 410,650 67 HMA Dike (Type D) LF 405 410 $ 30 $ 12,300 $ 15 $ 6,150 $ 15 $ 6,150 10.00 4,100.00 $ 22 $ 9,020 68 Tack Coat TON 6 6 $ 1,000 $ 6,000 $ 2 $ 12 $ 500 $ 3,000 1,000.00 6,000.00 $ 1,800 $ 10,800 69 Cold Plane Asphalt Concrete Pavement SQYD 56 56 $ 200 $ 11,200 $ 90 $ 5,040 $ 250 $ 14,000 300.00 16,800.00 $ 195 $ 10,920 70 Remove Base and Surfacing CY 678 540 $ 100 $ 54,000 $ 90 $ 48,600 $ 65 $ 35,100 100.00 54,000.00 $ 105 $ 56,700 71 Remove AC Dike LF 202 210 $ 15 $ 3,150 $ 2 $ 420 $ 25 $ 5,250 10.00 2,100.00 $ 25 $ 5,250 72 Temporary Shoring LS 1 LS $ 180,000 $ 180,000 $ 70,000 $ 70,000 $ 5,000 $ 5,000 50,000.00 50,000.00 $ 1,600,000 $ 1,600,000 73 (B) 24" Cast-In-Drilled-Hole Concrete Piling LF 525 530 $ 300 $ 159,000 $ 385 $ 204,050 $ 425 $ 225,250 400.00 212,000.00 $ 560 $ 296,800 74 (B) 96" Cast-In-Drilled-Hole Concrete Piling LF 362 370 $ 2,900 $ 1,073,000 $ 3,100 $ 1,147,000 $ 4,000 $ 1,480,000 3,500.00 1,295,000.00 $ 3,200 $ 1,184,000 75 (B) Prestressing Cast-In-Place Concrete LS 1 LS $ 108,000 $ 108,000 $ 94,000 $ 94,000 $ 100,000 $ 100,000 85,000.00 85,000.00 $ 105,000 $ 105,000 76 (F) (B) Structural Concrete, Bridge Footing CY 38 38 $ 935 $ 35,530 $ 900 $ 34,200 $ 1,500 $ 57,000 1,500.00 57,000.00 $ 1,385 $ 52,630 77 (F) (B) Structural Concrete, Bridge CY 520 520 $ 1,300 $ 676,000 $ 2,208 $ 1,148,160 $ 2,475 $ 1,287,000 4,200.00 2,184,000.00 $ 2,500 $ 1,300,000 78 (F) (B) Structural Concrete, Bridge (Polymer Fiber) CY 221 221 $ 1,300 $ 287,300 $ 1,550 $ 342,550 $ 2,250 $ 497,250 2,200.00 486,200.00 $ 660 $ 145,860 79 (F) (B) Joint Seal Assembly (MR 3 1/2") LF 28 28 $ 540 $ 15,120 $ 1,000 $ 28,000 $ 1,000 $ 28,000 1,000.00 28,000.00 $ 785 $ 21,980 80 (F) (B) Bar Reinforcing Steel (Bridge) LB 364,384 364,384 $ 2 $ 583,014 $ 2 $ 728,768 $ 1.50 $ 546,576 2.00 728,768.00 $ 1.65 $ 601,233.60 81 (F) (B) Headed Bar Reinforcement EA 10 10 $ 45 $ 450 $ 25 $ 250 $ 125 $ 1,250 300.00 3,000.00 $ 297 $ 2,970 82 18" Alternative Pipe Culvert LF 30 68 $ 500 $ 34,000 $ 200 $ 13,600 $ 600 $ 40,800 600.00 40,800.00 $ 250 $ 17,000 83 8" Alternative Pipe Culvert Downdrain LF 167 170 $ 100 $ 17,000 $ 150 $ 25,500 $ 375 $ 63,750 200.00 34,000.00 $ 180 $ 30,600 US 101 University Avenue Bid Tabulation 2 3/15/2023
Item No. Unit Price (in
Figures)
Estimated
Quantity
Engineer's Estimate
Item Description Item Total (in
Figures)
Estimated
Quantity Unit Item Total (in Figures)
Unit Price (in
Figures)
Item Total (in
Figures)
MCM Construction, Inc. Viking Construction Company Gordon N. Ball, Inc. Beador Construction Company, Inc.
Unit Price (in
Figures)
Item Total (in
Figures)
Unit Price (in
Figures)
Item Total (in
Figures)
Unit Price (in
Figures)
84 Corrugated Steel Pipe Tee Dissipator EA 2 3 $ 1,000 $ 3,000 $ 700 $ 2,100 $ 3,500 $ 10,500 2,000.00 6,000.00 $ 1,650 $ 4,950 85 Drainage Inlet Marker EA 7 8 $ 100 $ 800 $ 120 $ 960 $ 75 $ 600 100.00 800.00 $ 135 $ 1,080 86 (F) Structural Concrete (Drainage Inlet) CY 22 26 $ 800 $ 20,800 $ 4,000 $ 104,000 $ 4,000 $ 104,000 5,000.00 130,000.00 $ 3,175 $ 82,550 87 Minor Concrete (Inlet Depression) CY 7 8 $ 1,200 $ 9,600 $ 2,000 $ 16,000 $ 3,500 $ 28,000 250.00 2,000.00 $ 1,650 $ 13,200 88 Remove Inlet EA 1 1 $ 1,000 $ 1,000 $ 3,500 $ 3,500 $ 5,000 $ 5,000 5,000.00 5,000.00 $ 4,500 $ 4,500 89 Inlet Depression EA 1 8 $ 2,000 $ 16,000 $ 2,500 $ 20,000 $ 3,500 $ 28,000 1,000.00 8,000.00 $ 1,650 $ 13,200 90 Modify Inlet to Manhole EA 3 5 $ 2,500 $ 12,500 $ 5,000 $ 25,000 $ 12,500 $ 62,500 5,000.00 25,000.00 $ 4,400 $ 22,000 91 Rock Slope Protection (Method B) CY 1.5 3 $ 2,000 $ 6,000 $ 550 $ 1,650 $ 3,500 $ 10,500 800.00 2,400.00 $ 2,000 $ 6,000 92 Minor Concrete (Miscellaneous Construction) CY 152 130 $ 1,500 $ 195,000 $ 1,750 $ 227,500 $ 1,000 $ 130,000 2,000.00 260,000.00 $ 1,100 $ 143,000 93 Curb Ramp (Case F) EA 1 1 $ 5,000 $ 5,000 $ 4,200 $ 4,200 $ 10,000 $ 10,000 3,000.00 3,000.00 $ 6,000 $ 6,000 94 Curb Ramp (Case G, Modified) EA 1 3 $ 5,000 $ 15,000 $ 5,500 $ 16,500 $ 10,000 $ 30,000 3,000.00 9,000.00 $ 6,000 $ 18,000 95 Island Passageway EA 1 1 $ 2,000 $ 2,000 $ 5,000 $ 5,000 $ 10,000 $ 10,000 3,000.00 3,000.00 $ 20,000 $ 20,000 96 (F) Miscellaneous Iron And Steel LB 2,282 2,610 $ 3 $ 7,830 $ 6 $ 15,660 $ 7 $ 18,270 2.00 5,220.00 $ 3.50 $ 9,135 97 (F) (B) Miscellaneous Metal (Bridge) LB 860 860 $ 16 $ 13,760 $ 25 $ 21,500 $ 30 $ 25,800 20.00 17,200.00 $ 16 $ 13,760 98 Chain Link Fence (Type CL-6, Vinyl-Clad) LF 1,185 461 $ 80 $ 36,880 $ 45 $ 20,745 $ 50 $ 23,050 45.00 20,745.00 $ 45 $ 20,745 99 Remove Chain Link Fence LF 530 530 $ 20 $ 10,600 $ 17 $ 9,010 $ 32.50 $ 17,225 10.00 5,300.00 $ 20 $ 10,600 100 Object Marker (Type K-2) EA 1 1 $ 200 $ 200 $ 125 $ 125 $ 40 $ 40 100.00 100.00 $ 220 $ 220 101 Remove Roadside Sign EA 8 9 $ 150 $ 1,350 $ 125 $ 1,125 $ 120 $ 1,080 120.00 1,080.00 $ 275 $ 2,475 102 Relocate Roadside Sign (One Post) EA 2 2 $ 300 $ 600 $ 400 $ 800 $ 225 $ 450 250.00 500.00 $ 440 $ 880 103 Relocate Roadside Sign (Two Post) EA 4 4 $ 500 $ 2,000 $ 725 $ 2,900 $ 275 $ 1,100 300.00 1,200.00 $ 880 $ 3,520 104 Treated Wood Waste LB 2,800 1,512 $ 1 $ 1,512 $ 2 $ 3,024 $ 2 $ 3,024 1.00 1,512.00 $ 2 $ 3,024 105 Roadside Sign - One Post EA 10 12 $ 800 $ 9,600 $ 450 $ 5,400 $ 550 $ 6,600 600.00 7,200.00 $ 440 $ 5,280 106 Roadside Sign - Two Post EA 2 2 $ 1,500 $ 3,000 $ 1,000 $ 2,000 $ 1,250 $ 2,500 1,000.00 2,000.00 $ 1,300 $ 2,600 107 Install Sign (Mast-Arm Hanger Method) EA 2 2 $ 500 $ 1,000 $ 500 $ 1,000 $ 500 $ 1,000 500.00 1,000.00 $ 925 $ 1,850 108 Remove Guardrail LF 73 73 $ 50 $ 3,650 $ 55 $ 4,015 $ 50 $ 3,650 50.00 3,650.00 $ 60 $ 4,380 109 Midwest Guardrail System (Steel Post) LF 113 183 $ 300 $ 54,900 $ 70 $ 12,810 $ 115 $ 21,045 65.00 11,895.00 $ 130 $ 23,790 110 Transition Railing (Type WB-31) EA 2 1 $ 40,000 $ 40,000 $ 6,600 $ 6,600 $ 6,500 $ 6,500 7,000.00 7,000.00 $ 6,500 $ 6,500 111 Alternative In-line Terminal System EA 1 1 $ 5,000 $ 5,000 $ 5,300 $ 5,300 $ 5,000 $ 5,000 5,000.00 5,000.00 $ 4,400 $ 4,400 112 End Cap (Type A) EA 1 1 $ 1,500 $ 1,500 $ 2,200 $ 2,200 $ 500 $ 500 2,000.00 2,000.00 $ 220 $ 220 113 End Cap (Type TC) EA 1 1 $ 1,500 $ 1,500 $ 600 $ 600 $ 500 $ 500 500.00 500.00 $ 220 $ 220 114 End Anchor Assembly (Type SFT-M) EA 1 1 $ 1,500 $ 1,500 $ 2,700 $ 2,700 $ 2,500 $ 2,500 3,000.00 3,000.00 $ 2,300 $ 2,300 115 End Anchor Block EA 1 1 $ 10,000 $ 10,000 $ 7,200 $ 7,200 $ 7,000 $ 7,000 10,000.00 10,000.00 $ 9,350 $ 9,350 116 Vegetation Control (Minor Concrete) SQYD 120 147 $ 100 $ 14,700 $ 260 $ 38,220 $ 250 $ 36,750 150.00 22,050.00 $ 235 $ 34,545 117 (F) (B) Chain Link Railing (Type 7L, Vinyl-Clad) LF 1,177 1,177 $ 170 $ 200,090 $ 380 $ 447,260 $ 395 $ 464,915 215.00 253,055.00 $ 400 $ 470,800 118 Concrete Barrier (Type 60R Modified A) LF 110 110 $ 300 $ 33,000 $ 900 $ 99,000 $ 1,050 $ 115,500 700.00 77,000.00 $ 800 $ 88,000 119 Concrete Barrier (Type 60R Modified B) LF 110 26 $ 500 $ 13,000 $ 950 $ 24,700 $ 1,200 $ 31,200 800.00 20,800.00 $ 1,400 $ 36,400 120 Concrete Barrier (Type 60MS) LF 110 96 $ 500 $ 48,000 $ 425 $ 40,800 $ 400 $ 38,400 400.00 38,400.00 $ 400 $ 38,400 121 Remove Concrete Barrier LF 110 110 $ 80 $ 8,800 $ 105 $ 11,550 $ 250 $ 27,500 100.00 11,000.00 $ 185 $ 20,350 122 Thermoplastic Pavement Marking (Enhanced Wet Night
Visibility) SQFT 8,120 6,720 $ 10 $ 67,200 $ 10 $ 67,200 $ 9 $ 60,480 9.00 60,480.00 $ 10 $ 67,200 123 Bike Lane Marking SQFT 1,670 2,260 $ 10 $ 22,600 $ 14 $ 31,640 $ 13 $ 29,380 13.00 29,380.00 $ 15 $ 33,900 124 4" Thermoplastic Traffic Stripe (Yellow, Solid) LF 1,660 1,660 $ 2 $ 3,320 $ 3 $ 4,980 $ 2.25 $ 3,735 2.00 3,320.00 $ 2.60 $ 4,316 125 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 17-7) LF 2,800 3,360 $ 2 $ 6,720 $ 5.50 $ 18,480 $ 5 $ 16,800 5.00 16,800.00 $ 5.70 $ 19,152 126 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 18-12) LF 7,520 7,520 $ 2 $ 15,040 $ 5.50 $ 41,360 $ 5 $ 37,600 5.00 37,600.00 $ 5.70 $ 42,864 US 101 University Avenue Bid Tabulation 3 3/15/2023
Item No. Unit Price (in
Figures)
Estimated
Quantity
Engineer's Estimate
Item Description Item Total (in
Figures)
Estimated
Quantity Unit Item Total (in Figures)
Unit Price (in
Figures)
Item Total (in
Figures)
MCM Construction, Inc. Viking Construction Company Gordon N. Ball, Inc. Beador Construction Company, Inc.
Unit Price (in
Figures)
Item Total (in
Figures)
Unit Price (in
Figures)
Item Total (in
Figures)
Unit Price (in
Figures)
127 4" Yellow Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) LF 1,660 1,660 $ 2 $ 3,320 $ 3 $ 4,980 $ 2.25 $ 3,735 2.00 3,320.00 $ 2.60 $ 4,316 128 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) LF 12,609 13,060 $ 2 $ 26,120 $ 3.25 $ 42,445 $ 3 $ 39,180 3.00 39,180.00 $ 3.40 $ 44,404 129 6" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 6-1) LF 922 1,000 $ 4 $ 4,000 $ 4 $ 4,000 $ 3 $ 3,000 3.00 3,000.00 $ 3.30 $ 3,300 130 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) LF 2,575 3,290 $ 3 $ 9,870 $ 5.50 $ 18,095 $ 5 $ 16,450 5.00 16,450.00 $ 5.80 $ 19,082 131 8" Thermoplastic Traffic Stripe (Enhanced Wet Night Visibility) (Broken 18-12) LF 3,780 3,780 $ 3 $ 11,340 $ 5.50 $ 20,790 $ 5 $ 18,900 5.00 18,900.00 $ 5.80 $ 21,924 132 Pavement Marker (Retroreflective) EA 888 1,036 $ 30 $ 31,080 $ 7 $ 7,252 $ 6 $ 6,216 6.00 6,216.00 $ 7.40 $ 7,666 133 Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste) LF 7,640 4,210 $ 5 $ 21,050 $ 3.50 $ 14,735 $ 3 $ 13,682.50 3.00 12,630.00 $ 3.90 $ 16,419 134 Remove Thermoplastic Traffic Stripe LF 11,600 12,040 $ 1 $ 12,040 $ 3.50 $ 42,140 $ 3 $ 39,130 3.00 36,120.00 $ 3.60 $ 43,344 135 Remove Thermoplastic Pavement Marking SQFT 950 950 $ 5 $ 4,750 $ 6 $ 5,700 $ 5 $ 4,750 5.00 4,750.00 $ 5.70 $ 5,415 136 Remove Pavement Marker EA 441 492 $ 5 $ 2,460 $ 4 $ 1,968 $ 3 $ 1,476 3.00 1,476.00 $ 3.30 $ 1,623.60 137 Signal and Lighting (City Street Location 1) LS 1 LS $ 96,000 $ 96,000 $ 110,000 $ 110,000 $ 120,000 $ 120,000 125,000.00 125,000.00 $ 125,000 $ 125,000 138 Signal and Lighting (City Street Location 2) LS 1 LS $ 179,000 $ 179,000 $ 230,000 $ 230,000 $ 255,000 $ 255,000 260,000.00 260,000.00 $ 275,000 $ 275,000 139 Lighting (City Street) LS 1 LS $ 366,000 $ 366,000 $ 475,000 $ 475,000 $ 505,000 $ 505,000 500,000.00 500,000.00 $ 540,000 $ 540,000 140 Modifying Lighting Systems LS 1 LS $ 91,000 $ 91,000 $ 80,000 $ 80,000 $ 85,000 $ 85,000 85,000.00 85,000.00 $ 90,000 $ 90,000 141 Rectangular Rapid Flashing Beacon System (City) LS 1 LS $ 84,000 $ 84,000 $ 90,000 $ 90,000 $ 100,000 $ 100,000 150,000.00 150,000.00 $ 110,000 $ 110,000 142 Modify Signal and Lighting System LS 1 LS $ 262,000 $ 262,000 $ 350,000 $ 350,000 $ 375,000 $ 375,000 385,000.00 385,000.00 $ 390,000 $ 390,000 143 Modify Fiber Optic System LS 1 LS $ 97,000 $ 97,000 $ 100,000 $ 100,000 $ 116,109.50 $ 116,109.50 125,000.00 125,000.00 $ 130,000 $ 130,000 144 Temporary High Visibility Fence LF 710 940 $ 10 $ 9,400 $ 7 $ 6,580 $ 10 $ 9,400 3.00 2,820.00 $ 7 $ 6,580 145 Mobilization LS 1 LS $ 1,110,000 $ 1,110,000 $ 1,190,000 $ 1,190,000 $ 1,395,000 $ 1,395,000 1,250,000.00 1,250,000.00 $ 1,450,000 $ 1,450,000 CONSTRUCTION TOTAL 11,100,000 11,966,203.00 $ 13,991,100.00 12,867,310.00 $ 14,625,300 US 101 University Avenue Bid Tabulation 4 3/15/2023