Cities Index.
Agenda packet

East Palo Alto City Council
July 29, 2025

Document
Agenda packet
Meeting
July 29, 2025
Body
East Palo Alto City Council
Pages
57
Original file
45.7 MB
Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

EAST PALO ALTO CITY COUNCIL

REGULAR SESSION AGENDA
Tuesday, July 29, 2025, 6:00 PM
EPA Government Center
2415 University Avenue, First Floor
East Palo Alto, CA 94303
NOTICE
This meeting will be held virtually and in-person at the Council Chambers located on 2415 University Ave, First Floor East Palo Alto, CA 94303. The virtual portion of this City Council meeting will be conducted in accordance with City of East Palo Alto Resolution adopted pursuant to Assembly Bill 361.

The public may participate in the City Council Meeting via Zoom Meeting or by attending inperson in the Council Chambers at 2415 University Ave, First Floor East Palo Alto, CA 94303.

Community members may provide comments by emailing [email protected], submitting a speaker card at the meeting, or using the RAISE HAND feature when the Mayor or City Clerk call for public comment. Emailed comments should include the specific agenda item on which you are commenting.

East Palo Alto City Council July 29, 2025 Agenda
1 E
astPaloAltoCityCouncil July29, 2025Agenda
2 Pursuant to Government Code §54953(b), this meeting will include a teleconference location at the Marriott Marquis San Diego Marina, 333 W Harbor Dr, San Diego CA 92101, US.

Councilmember Webster Lincoln will be attending the Meeting via teleconference. The public shall have the opportunity to address the City Council at this teleconference location pursuant to Government Code Section §54954.3. All votes during the teleconferencing session will be conducted by roll call vote.

Please click this URL to join
https://us06web.zoom.us/j/81142172069
Or join by phone:

Dial (for higher quality, dial a number based on your current location):

US: +1 669 900 6833 or
+ 1 346 248 7799 or
+ 1 253 215 8782 or
+ 1 312 626 6799 or
+ 1 929 205 6099 or
+ 1 301 715 8592
Webinar ID: 811 4217 2069
International numbers available: https://zoom.us/u/aMWYF4KT East Palo Alto City Council July 29, 2025 Agenda
3 1. CALL TO ORDER AND ROLL CALL

2. APPROVAL OF THE AGENDA

3. APPROVAL OF CONSENT CALENDAR

3.1 Personnel Staffing Change, POA Side Letter Agreement, and Classification Specification Updates

3.2 Ecumenical Hunger Program (EHP) Proclamation

3.3 Grant Application for the 2025 Cycle 3 Transportation Demand Management (TDM) Program
Recommendation:

Adopt a resolution:

1. Approving an amendment to the City’s Classification Plan adding 1.0 FTE Housing Specialist I/II (1 year LTD);

2. Approving classification updates to the following:

1. Community Services Officer

3. Approving and establishing the related compensation schedules;

4. Approving Police Officers’ Association (POA) side letter agreement; and

5. Finding that the proposed actions do not constitute “projects” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that they are governmental fiscal, organizational or administrative activities that will not result in direct or indirect changes in the environment.

Recommendation: Present the proclamation for the Ecumenical Hunger Program (EHP).

Recommendation:

Adopt a resolution:

1. Supporting the Transportation Demand Management (TDM) Program Refinement and Implementation Project by authorizing the City Manager to submit an application to the San Mateo County Transportation Authority for the 2025 Cycle 3 TDM Program Funding program for a $150,000 grant for the TDM Program Refinement and Implementation Project and take all actions necessary to give effect to the resolution, including appropriating $7,895 in matching funding and execute legal documents to secure the grant funding; and

2. Finding that the proposed action does not constitute a “project” with the East Palo Alto City Council July 29, 2025 Agenda
4 3.4 Approval of Settlement Agreement

3.5 City Council Meeting Minutes

3.6 Purchase of Two Police Patrol Vehicles

4. CLOSED SESSION

5. PUBLIC COMMENT

6. INFORMATIONAL REPORTS

7. SPECIAL PRESENTATIONS

8. ADJOURN CITY COUNCIL REGULAR MEETING TO THE EAST PALO ALTO

SANITARY DISTRICT BOARD MEETING

9. APPROVAL OF THE EPASD BOARD MEETING AGENDA
meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that it is a governmental fiscal, organizational or administrative activity that will not result in direct or indirect changes in the environment.

Recommendation: By motion, approve and authorize the City Attorney to sign a settlement agreement in the matter of Sandra Floyd v. City of East Palo Alto (24-CIV-00140).

Recommendation: Adopt the minutes of the July 15, 2025, Meeting.

Recommendation:

Adopt a resolution:

1. Authorizing the City Manager to purchase two 2025 Dodge Durango Police Vehicles from Elk Grove Auto Group for the Police Department in an amount not to exceed $116,954.26; and

2. Approve the purchase under an exception to formal bidding procedures pursuant to East Palo Alto Municipal Code Section

2.84.0740(DL); and

3. Find that the proposed action does not constitute a “project” with the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that it is a governmental fiscal, organizational or administrative activity that will not result in direct or indirect changes in the environment.

East Palo Alto City Council July 29, 2025 Agenda
5 10. APPROVAL OF THE EPASD BOARD MEETING CONSENT CALENDAR

10.1 2025 Sanitary Sewer Management Plan Update

10.2 2025 Sewer System Master Plan

11. EPASD BOARD MEETING PUBLIC HEARING

11.1 Public Hearing and Approval of Sewer Service Charges to be Collected on the San Mateo County Tax Roll for FY 2025–26

12. EPASD BOARD REPORTS
Recommendation: 1. Adopting the 2025 Sanitary Sewer System Management Plan; and

2. Finding that the proposed action is exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines section 15308.

Recommendation:

Adopt a resolution:

1. Approving the 2025 Sanitary Sewer System Master Plan; and

2. Finds that the proposed action being considered by the City Council is exempt from the California Environmental Quality Act (CEQA) because it requires the implementation of management operations programs and plans to enhance and protect the environment by limiting the occurrence of SSOs in the City. (CEQA Guideline section 15308). Further, implementation of the proposed action may require the installation of minor sewer system facilities which will involve either minor alterations to existing facilities, or repair or replacement of existing facilities involving negligible or no expansion of sewer capacity, and as such, are exempt from review under CEQA Guidelines sections 15301 and 15302.

Recommendation:

1. Hold a public hearing to consider any objections or protests to the placement of EPASD’s FY 2025–26 sewer service charges on the San Mateo County secured property tax roll pursuant to Health and Safety Code §5473–5473.4; and

2. Adopt a resolution:
a. Confirming the written report of charges and authorizing the charges to be submitted to the County Tax Collector for collection; and
b. Finding the proposed action does not constitute a “project” with the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that it is a governmental fiscal, organizational or administrative activity that will not result in direct or indirect changes in the environment.

East Palo Alto City Council July 29, 2025 Agenda
6 13. ADJOURN EAST PALO ALTO SANITARY DISTRICT BOARD MEETING AND

RECONVENE CITY COUNCIL REGULAR MEETING

14. PUBLIC HEARINGS

14.1 Cost Allocation Plan and User Fee reports and amendment to City’s Master Fee Schedule – Continued from June 17 and July 15, 2025

15. POLICY AND ACTION

15.1 The New Civic Commons
Recommendation:

1. Approving the Cost Allocation Plan and User and Regulatory Fee Study as the basis for amending the Master Fee Schedule;

2. Amending the City’s Master Fee Schedule, based on Cost Allocation Plan and User and Regulatory Fee Study; and

3. Finding the proposed action does not constitute a “project” with the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that it is a governmental fiscal, organizational or administrative activity that will not result in direct or indirect changes in the environment.

Recommendation:

By motion:

1. Delegate to the City Manager the authority to grant a design review permit, any other required permits for up to an approximately 102,614 square foot, four-story Civic Center on a four-acre property (separate 20,000 square foot, single-story police station on the same property will return to Council in the future and will be permitted at that time), and authority to act on all subsequent environmental clearance documents/findings, as required by applicable law (CEQA);

2. Authorize the City Manager to negotiate and execute a memorandum of understanding (MOU), in a form approved by the City Attorney, which commits the City to use restrictions on a proposed track and field facility at the proposed Civic Commons as a condition of receiving initial grant funding;

3. Adopt California Environmental Quality Act (CEQA) findings, based upon the analysis in this staff report, and documents in the administrative record, find that the Civic Commons is within the scope of the prior Jobtrain Office Mitigated Negative Declaration (MND) and does not trigger subsequent or supplemental environmental review under CEQA Guidelines Section 15162. Further find that that the proposed Civic Commons (including the track and field) are within the scope of the Ravenswood Business District (RBD) Final Environmental Impact Report East Palo Alto City Council July 29, 2025 Agenda
7 15.2 EPACENTER 2025 Grant Agreement for Community Events

16. COUNCIL REPORTS

17. ADJOURNMENT
(EIR) and incorporate the mitigation measures from that Mitigation Monitoring and Reporting Programs (MMRPs) from the RBD Specific Plan FEIR and Subsequent FEIR, and the Jobtrain MND.

Recommendation:

1. Adopt a resolution authorizing the City Manager to award to and negotiate and execute an agreement with EPACENTER for providing monthly Community Events at their location for no cost to the community during FY25-26 until June 30, 2026, in a form approved by the City Attorney, for $100,000, in an amount not-to-exceed $100,000.

2. The action being considered by the City Council is exempt from the California Environmental Quality Act (CEQA) because it is not a “project” pursuant to 15378(b)(4) because it is a fiscal activity which does not involve any commitment to any specific project which may result in a potentially significant impact on the environment.

Upcoming meetings:

Regular Meeting September 2, 2025 6:30 PM
Regular Meeting September 16, 2025 6:30 PM
Study Session September 23, 2025 6:00 PM
East Palo Alto City Council July 29, 2025 Agenda
8 This AGENDA is posted in accordance with Government Code Section 54954.2(a) This Notice of Availability of Public Records: All public records relating to an open session item which are not exempt from disclosure pursuant to the Public Records Act, that are distributed to the majority of the City Council will be available for public inspection at the City Clerk’s Office, 2415 University Avenue, East Palo Alto, CA at the same time that the public records are distributed or made available to the City Council. Such documents may also be available on the East Palo Alto website www.cityofepa.org subject to staff’s ability to post the documents prior to the meeting. Information may be obtained by calling (650) 853-3100.

The City Council meeting packet may be reviewed by the public in the Library or the City Clerk's Office. Any writings or documents pertaining to an open session item provided to a majority of the City Council less than 72 hours prior to the meeting, shall be made available for public inspection at the front counter at the City Clerk's Office, 2ND Floor, City Hall, 2415 University Avenue, East Palo Alto, California 94303 during normal business hours. Information distributed to the Council at the Council meeting becomes part of the public record. A copy of written material, pictures, etc. should be provided for this purpose.

East Palo Alto City Council Chambers is ADA compliant. Requests for disability related modifications or accommodations, aids or services may be made by a person with a disability to the City Clerk's office at (650) 853-3127 no less than 72 hours prior to the meeting as required by Section 202 of the Americans with Disabilities Act of 1990 and the federal rules and regulations adopted in implementation thereof.

DECLARATION OF POSTING
This Notice is posted in accordance with Government Code §54954.2(a) or §54956. Members of the public can view electronic agendas and staff reports by accessing the City website. Under penalty of perjury, this Agenda was posted to the public at least 72 hours prior to the meeting.

POSTED: July 23, 2025
ATTEST:

James Colin
City Clerk
East Palo Alto City Council July 29, 2025 Agenda
9 CONSENT ITEM 3.1

EAST PALO ALTO

CITY COUNCIL

STAFF REPORT
DATE: July 29, 2025
TO: Honorable Mayor and Members of the City Council
VIA: Melvin E. Gaines, City Manager
BY: Shiri Klima, Assistant City Manager
Ana Maria Torres-Mondragon, Human Resources Manager
SUBJECT: Personnel Staffing Change, POA Side Letter Agreement, and Classification Specification Updates
Recommendation
Adopt a resolution:

1. Approving an amendment to the City’s Classification Plan adding 1.0 FTE Housing Specialist I/II (1 year LTD);

2. Approving classification updates to the following:
a. Community Services Officer

3. Approving and establishing the related compensation schedules;

4. Approving Police Officers’ Association (POA) side letter agreement; and

5. Finding that the proposed actions do not constitute “projects” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that they are governmental fiscal, organizational or administrative activities that will not result in direct or indirect changes in the environment.

Alignment with City Council Strategic Plan
This recommendation is primarily aligned with:

Priority: Governance, Organizational Strength, and Fiscal Sustainability 10 CONSENT ITEM 3.1
Background
Because of the evolving needs of the City, changes related to staffing, community expectations, and management’s intent to continue pursuing Council’s strategic goal of “Governance, Organizational Strength, and Fiscal Sustainability,” staff is proposing several changes related to the City’s departmental organization and staffing. These proposed changes will support critical ongoing Community Development and Police Department initiatives, ultimately strengthening the overall managerial control and responsibility for the City’s current service levels. Two side letters are being presented to illustrate the City’s ongoing efforts to work collaboratively with labor on important matters.

As codified in the City’s Personnel Policies and Procedures approved by the City Council on August 28, 1985 (Resolution #00210), Rule 3.4.05 states: “A job specification shall be a written statement providing the title and definition of a class, examples of the duties to be performed and the minimum qualifications.” As a member of the California Public Employees’ Retirement System (CalPERS), the City is also subject to applicable provisions of the Public Employee Retirement Law (PERL) referenced in the California Government Code and the California Code of Regulations.

Section 3.4.06 of the City of East Palo Alto Personnel Policies and Procedures manual establishes the procedures for department heads or the Personnel Officer (which is the City Manager) to create a new classification. Requests for the creation of a new class can be made by a department head to the Personnel Officer, or by the Personnel Officer. After review, the Personnel Officer submits the new job specification, class title and salary range to the City Council to be considered for addition to the Classification Plan. The new class is officially established upon adoption by the City Council.

Analysis
Staff is proposing the following staffing changes:

Police Department
Operations Division
Staff is proposing a classification update for the Community Services Officer classification as a strategic effort to broaden our applicant pool. The minor edit is to update the minimum qualifications from require experienced law enforcement to a desired qualification going forward.

Community and Economic Development Department
The Community and Economic Development Department oversees Building, Housing/ Rent Stabilization, and Planning services for the City.
11 CONSENT ITEM 3.1
Housing Division
During the FY25-26 budget process, staff requested and were granted the addition of 1.0 FTE Housing Specialist I/II (1 Year LTD) classification to assist with providing critical support to both divisions and aligns directly with Council-adopted priorities in Housing and Rent Stabilization.

This classification requires a new job description, as described below.

The incumbent is intended to advance and sustain several initiatives for Housing and Rent Stabilization, including four new items added to the Council priorities list including: an Inclusionary Housing update, a First-Time Home Buyer Program, a Home Repair Program, and Foreclosure Prevention Initiatives. The incumbent will also support existing projects and programs including anti-displacement services through Measure JJ and housing preservation as identified in the Housing Element.

The incumbent is also intended to advance and sustain several initiatives for Rent Stabilization Program such as assist in the implementation and administration of the City’s new Rent Registry, monitor compliance for both legacy and new units under Just Cause, supporting increased demand for Just Cause workshops and Ellis Act compliance, and collaborating with the two current RSP staff to process petitions
Functions under these two divisions will increase efficiency and services.

Side Letter Updates:

Police Officer’s Association (POA)
The City is amending the Police MOU Article 17.1: Probationary Period to allow probationary periods to be extended when an employee goes on extended leave (30 consecutive days or more) during their probation. This change ensures that the employee receives his or her full probationary period in active service, giving him or her a fair opportunity to demonstrate performance.

This update aligns with the City’s operational needs by maintaining consistent evaluation standards, while also supporting employees fairly and equitably. Ultimately, this amendment benefits both the City and the employee, ensuring everyone has the time and information needed for long-term success.

All meet and confer obligations required for this staff report have been met.

These proposed changes will improve the efficiency of existing services related to the Police Department and Community and Economic Development Department.

Fiscal Impact
There is no fiscal impact for this item. Approval of the positions added to the FY2025-26 budget have already been complete as a part of the budget process. Additionally, the pay schedule for 12 CONSENT ITEM 3.1
these positions was already approved on June 17, 2025. This item involves approving the job descriptions only; if approved, City staff will proceed with releasing the recruitments for these positions and utilize the funds from these budgeted positions.

Public Notice
The public was provided notice by making the agenda and report available on the City’s website and on a bulletin board located at City Hall: 2415 University Avenue, East Palo Alto.

Environmental
The proposed action does not constitute a “project” with the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that it is a governmental fiscal, organizational or administrative activity that will not result in direct or indirect changes in the environment.

Government Code § 84308
Applicability of Levine Act: No, as there are no entitlements related to the proposed action.

Analysis of Levine Act Compliance: Not applicable.

Attachments

1. Resolution
a. Exhibit A: Community Services Officer Classification Specification/ Job Description b. Exhibit B: Housing Specialist I/II (1 year LTD) Classification Specification/ Job Description
c. Exhibit C: Compensation Schedules
d. Exhibit D: Side Letter amending the Police MOU Article 17.1: Probationary Period 13 DRAFT
Resolution No. XX-2025 1 of 3
RESOLUTION NO. XX– 2025

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF EAST PALO ALTO
APPROVING AN AMENDMENT TO THE CITY’S CLASSIFICATION PLAN ADDING 1.0 FTE HOUSING SPECIALIST I/II (1 YEAR LIMITED TERM), APPROVING CLASSIFICATION UPDATE

TO COMMUNITY SERVICES OFFICER, APPROVING, ESTABLISHING THE RELATED COMPENSATION SCHEDULES, AND APPROVING POA SIDE LETTER.

WHEREAS, because of the evolving needs of the City, changes related to staffing, community expectations, and management’s intent to continue pursuing Council’s strategic goal to “Governance, Organizational Strength, and Fiscal Sustainability,” staff is proposing several changes related to the City’s departmental organization and staffing; and
WHEREAS, these proposed changes will support critical ongoing Community Development and Police Department initiatives, ultimately strengthening the overall managerial control and responsibility for the City’s current service levels; and
WHEREAS, one side letter is being presented to illustrate the City’s on-going efforts to work collaboratively with labor on important matters; and
WHEREAS, as codified in the City’s Personnel Policies and Procedures approved by the City Council on August 28, 1985 (Resolution #00210), Rule 3.4.05 states: “A job specification shall be a written statement providing the title and definition of a class, examples of the duties to be performed and the minimum qualifications”; and
WHEREAS, staff is proposing a classification update for the Community Services Officer classification as a strategic effort to broaden our applicant pool; and WHEREAS, during the FY25-26 budget process, staff requested and were granted the addition of 1.0 FTE Housing Specialist I/II (1 Year LTD) classification to assist with providing critical support to both divisions and aligns directly with Council adopted priorities in Housing and Rent Stabilization, and Council now wishes to adopt a job description for this position; and WHEREAS, the City is amending the Police MOU Article 17.1: Probationary Period to allow probationary periods to be extended when an employee goes on extended leave (30 consecutive days or more) during their probation; and
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of East Palo Alto hereby:

1. Finds the foregoing recitals are true and correct, and are incorporated by this action; and 14 DRAFT
Resolution No. XX-2025 2 of 3

2. Approves an amendment to the City’s Classification Plan adding 1.0 FTE Housing Specialist I/II (1 year LTD) and this classification’s job description, as attached hereto and incorporated herein as Exhibit B; and

3. Approves classification updates to the following:
a. Community Services Officer, as attached hereto and incorporated herein as Exhibit A; and

4. Approves and establishes the related compensation schedules (Exhibit C);

5. Approves Police Officers’ Association (POA) side letter agreement (Exhibit D); and

6. Finds the proposed actions do not constitute “projects” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that they are governmental fiscal, organizational or administrative activities that will not result in direct or indirect changes in the environment. [Continued on next page]
15 DRAFT
Resolution No. XX-2025 3 of 3
PASSED AND ADOPTED this 29th day of July 2025, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Martha Barragan. Mayor
ATTEST: APPROVED AS TO FORM:

James Colin, City Clerk John D. Lê, City Attorney
16 July 2025
FLSA: Non-Exempt

COMMUNITY SERVICE OFFICER

DEFINITION
Under general supervision, performs a variety of routine to complex field and administrative activities in support of police services and programs for the City’s Police Department; provides comprehensive nonsworn staff support to Police Department supervisory and management personnel on a wide variety of law enforcement programs, projects, and services; responds to public requests; and performs related duties, as assigned.

SUPERVISION RECEIVED AND EXERCISED
Receives general supervision from a Police Commander. Exercises no direct supervision over staff.

DISTINGUISHING CHARACTERISTICS
This is a non-sworn journey-level classification in the Police Department. Incumbents perform various field and administrative duties in support of designated non-sworn police activities and are responsible for providing support to the assigned management staff in a variety of areas. Successful performance of the work requires the frequent use of tact, discretion, and independent judgment, knowledge of departmental and City activities, and extensive staff and public contact. Positions at this level receive only occasional instruction or assistance as new or unusual situations arise and are fully aware of the operating procedures and policies of the work unit. This class is distinguished from the Community Services Aide in that the latter is an entry level, intern position and is not expected to perform the full range of duties related to police support work.

EXAMPLES OF TYPICAL JOB FUNCTIONS (Illustrative Only)
Management reserves the right to add, modify, change, or rescind the work assignments of different positions and to make reasonable accommodations so that qualified employees can perform the essential functions of the job.
 Assists with developing and conducting public information and education presentations on a variety of topics including crime prevention and Police Department activities and services.  Performs research and review of community and police activity data; maintains statistical data relative to program and unit objectives; prepares a variety of reports, correspondence, and other written materials; duplicates and distributes various written materials.  Provides comprehensive staff support to the Police Department on a wide variety of programs, projects, and services; performs research and review of community issues.  Maintains accurate departmental and law enforcement records and files; researches and compiles data and information from such files.
 Assists in preparing and processing a variety of reports, records, and logs relative to police matters.  Enforces miscellaneous municipal codes, ordinances, and regulations, including sign violations, abandoned property and vehicle violations.
17  Responds to public and employee inquiries in a courteous manner; provides information within the area of assignment; resolves complaints and contested citations in an efficient and timely manner.  Collaborates with partner agencies, community residents, and external organizations to plan and coordinate disaster preparedness, mitigation, response, and recovery efforts; assists in the preparation and implementation of emergency preparedness drills and training for City staff and residents; assists in updating official documents required by the State to qualify for assistance in disaster recovery.  Reviews and processes applications for police permits to be submitted for supervisor approval; maintains applicant database; fingerprints drug registrants, applicants for employment, and/or others; grants and prepares permits.
 Arranges and conducts various community meetings, events, and tours; makes oral presentations to community and school groups; conducts surveys; assists in writing articles and news releases relating to community relations activities.
 Designs and prepares content for pamphlets, brochures, and bulletins related to various topics including crime prevention and disaster preparedness.
 Collaborates with partner agencies, community residents, and external organizations to plan and coordinate disaster preparedness, mitigation, response, and recovery efforts; assists in the preparation and implementation of emergency preparedness drills and training for City staff and residents; assists in updating official documents required by the State to qualify for assistance in disaster recovery.  Attends a variety of trainings, workshops, classes, and events on behalf of the City.  Performs other related duties as assigned.

JOB-RELATED QUALIFICATIONS
Knowledge of:
 Functions, principles, and practices of law enforcement agencies.  Applicable Federal, State, and local laws, regulatory codes, ordinances, and procedures relevant to assigned area of responsibility.
 Basic principles of record keeping.
 Principles and techniques of developing and conducting public information presentations.  Principles and practices of data collection and report preparation.  Operations and functions of the Police Department and other public safety agencies.  Techniques for providing a high level of customer service by effectively dealing with the public, vendors, contractors, and City staff.
 The structure and content of the English language, including the meaning and spelling of words, rules of composition, and grammar.
 Modern equipment and communication tools used for business functions and program, project, and task coordination.
 Computers and software programs (e.g., Microsoft software packages) to conduct, compile, and/or generate documentation.

Ability to:
 Understand and follow oral and written instructions.
 Assess situations while remaining calm and using sound, independent judgment.  Maintain accurate records and files.
 Develop and deliver public information presentations related to the assigned areas of responsibility.  Compile and summarize information and data to prepare accurate, clear, and concise reports.  Safely and effectively use and operate specialized equipment required for the work.  Speak effectively before public groups and respond to questions.  Prepare clear concise reports, correspondence and other written materials. 18  Research, compile, and summarize a variety of informational and statistical data and materials.  Understand, interpret, explain, and apply all pertinent laws, codes, regulations, policies and procedures, and standards relevant to work performed.
 Effectively represent the department and the City in meetings with governmental agencies; community groups; various business, professional, and regulatory organizations; and in meetings with individuals.  Learn and understand the organization and operation of the City and of outside agencies as necessary to assume assigned responsibilities.
 Independently organize work, set priorities, meet critical deadlines, and follow-up on assignments.  Effectively use computer systems, software applications, and modern business equipment to perform a variety of work tasks.
 Communicate clearly and concisely, both orally and in writing, using appropriate English grammar and syntax.
 Use tact, initiative, prudence, and independent judgment within general policy, procedural, and legal guidelines.
 Establish, maintain, and foster positive and effective working relationships with those contacted in the course of work.

Education and Experience:

Any combination of training and experience that would provide the required knowledge, skills, and abilities is qualifying. A typical way to obtain the required qualifications would be:

Equivalent to graduation from the twelfth (12th) grade and two (2) years of experience performing administrative support duties in any field. Experience providing administrative support within a law enforcement or public safety setting is highly desired. Bilingual proficiency is preferred. Equivalent to an associate degree in criminal justice or a closely related field is desired.

Licenses and Certifications:
 Possession of, or ability to obtain, a valid California Driver’s License by time of appointment and a satisfactory driving record.
 Possession of a valid Cardiopulmonary Resuscitation (CPR) certificate is required at the time of appointment.

PHYSICAL DEMANDS
Must possess mobility to work in a standard office setting and use standard office equipment, including a computer; maintain physical standards, including mobility, physical strength, and stamina to respond to emergency situations; vision to read printed materials and a computer screen; and hearing and speech to communicate in person, before groups, and over the telephone or radio. The job involves fieldwork requiring frequent walking on uneven terrain and climbing and descending structures to identify problems or hazards. Finger dexterity is needed to access, enter, and retrieve data using a computer keyboard or calculator and to operate police services equipment. Positions in this classification frequently bend, stoop, kneel, reach, and climb to perform work and inspect work sites. Employees must possess the ability to lift, carry, push, and pull materials and objects necessary to perform job functions.

ENVIRONMENTAL CONDITIONS
Employees work indoors and outdoors, and are exposed to loud noise levels, cold and hot temperatures, inclement weather conditions, vibration, confining workspace, chemicals, mechanical and/or electrical hazards, and hazardous physical substances and fumes. Employees may interact with upset staff and/or public and private representatives in interpreting and enforcing departmental policies and procedures. The 19 principal duties of this class are performed in a police station environment with exposure to criminal offenders, mentally ill individuals, and persons potentially infected with communicable diseases. 20 April 2019July 2025
FLSA: Non-Exempt

COMMUNITY SERVICE OFFICER

DEFINITION
Under general supervision, performs a variety of routine to complex field and administrative activities in support of police services and programs for the City’s Police Department; provides comprehensive nonsworn staff support to Police Department supervisory and management personnel on a wide variety of law enforcement programs, projects, and services; responds to public requests; and performs related duties, as assigned.

SUPERVISION RECEIVED AND EXERCISED
Receives general supervision from a Police Commander. Exercises no direct supervision over staff.

DISTINGUISHING CHARACTERISTICS
This is a non-sworn journey-level classification in the Police Department. Incumbents perform various field and administrative duties in support of designated non-sworn police activities and are responsible for providing support to the assigned management staff in a variety of areas. Successful performance of the work requires the frequent use of tact, discretion, and independent judgment, knowledge of departmental and City activities, and extensive staff and public contact. Positions at this level receive only occasional instruction or assistance as new or unusual situations arise and are fully aware of the operating procedures and policies of the work unit. This class is distinguished from the Community Services Aide in that the latter is an entry level, intern position and is not expected to perform the full range of duties related to police support work.

EXAMPLES OF TYPICAL JOB FUNCTIONS (Illustrative Only)
Management reserves the right to add, modify, change, or rescind the work assignments of different positions and to make reasonable accommodations so that qualified employees can perform the essential functions of the job.
 Assists with developing and conducting public information and education presentations on a variety of topics including crime prevention and Police Department activities and services.  Performs research and review of community and police activity data; maintains statistical data relative to program and unit objectives; prepares a variety of reports, correspondence, and other written materials; duplicates and distributes various written materials.  Provides comprehensive staff support to the Police Department on a wide variety of programs, projects, and services; performs research and review of community issues.  Maintains accurate departmental and law enforcement records and files; researches and compiles data and information from such files.
 Assists in preparing and processing a variety of reports, records, and logs relative to police matters.  Enforces miscellaneous municipal codes, ordinances, and regulations, including sign violations, abandoned property and vehicle violations.
21  Responds to public and employee inquiries in a courteous manner; provides information within the area of assignment; resolves complaints and contested citations in an efficient and timely manner.  Collaborates with partner agencies, community residents, and external organizations to plan and coordinate disaster preparedness, mitigation, response, and recovery efforts; assists in the preparation Community Service Officer

Page 2 of 3 ends

and implementation of emergency preparedness drills and training for City staff and residents; assists in updating official documents required by the State to qualify for assistance in disaster recovery.  Reviews and processes applications for police permits to be submitted for supervisor approval; maintains applicant database; fingerprints drug registrants, applicants for employment, and/or others; grants and prepares permits.
 Arranges and conducts various community meetings, events, and tours; makes oral presentations to community and school groups; conducts surveys; assists in writing articles and news releases relating to community relations activities.
 Designs and prepares content for pamphlets, brochures, and bulletins related to various topics including crime prevention and disaster preparedness.
 Collaborates with partner agencies, community residents, and external organizations to plan and coordinate disaster preparedness, mitigation, response, and recovery efforts; assists in the preparation and implementation of emergency preparedness drills and training for City staff and residents; assists in updating official documents required by the State to qualify for assistance in disaster recovery.  Attends a variety of trainings, workshops, classes, and events on behalf of the City.  Performs other related duties as assigned.

JOB-RELATED QUALIFICATIONS

Knowledge of:

 Functions, principles, and practices of law enforcement agencies.  Applicable Federal, State, and local laws, regulatory codes, ordinances, and procedures relevant to assigned area of responsibility.
 Basic principles of record keeping.
 Principles and techniques of developing and conducting public information presentations.  Principles and practices of data collection and report preparation.  Operations and functions of the Police Department and other public safety agencies.  Techniques for providing a high level of customer service by effectively dealing with the public, vendors, contractors, and City staff.
 The structure and content of the English language, including the meaning and spelling of words, rules of composition, and grammar.
 Modern equipment and communication tools used for business functions and program, project, and task coordination.
 Computers and software programs (e.g., Microsoft software packages) to conduct, compile, and/or generate documentation.

Ability to:

 Understand and follow oral and written instructions.
 Assess situations while remaining calm and using sound, independent judgment.  Maintain accurate records and files.
 Develop and deliver public information presentations related to the assigned areas of responsibility.  Compile and summarize information and data to prepare accurate, clear, and concise reports. 22  Safely and effectively use and operate specialized equipment required for the work.  Speak effectively before public groups and respond to questions.  Prepare clear concise reports, correspondence and other written materials.  Research, compile, and summarize a variety of informational and statistical data and materials.  Understand, interpret, explain, and apply all pertinent laws, codes, regulations, policies and procedures, and standards relevant to work performed.
 Effectively represent the department and the City in meetings with governmental agencies; community groups; various business, professional, and regulatory organizations; and in meetings with individuals.

Community Service Officer

Page 3 of 3 ends

 Learn and understand the organization and operation of the City and of outside agencies as necessary to assume assigned responsibilities.
 Independently organize work, set priorities, meet critical deadlines, and follow-up on assignments.  Effectively use computer systems, software applications, and modern business equipment to perform a variety of work tasks.
 Communicate clearly and concisely, both orally and in writing, using appropriate English grammar and syntax.
 Use tact, initiative, prudence, and independent judgment within general policy, procedural, and legal guidelines.
 Establish, maintain, and foster positive and effective working relationships with those contacted in the course of work.

Education and Experience:

Any combination of training and experience that would provide the required knowledge, skills, and abilities is qualifying. A typical way to obtain the required qualifications would be:

Equivalent to graduation from the twelfth (12th) grade and two (2) years of experience performing administrative support duties in any field. Experience providing administrative support within a law enforcement or public safety setting is highly desired. related to the functions of law enforcement. Bilingual proficiency is preferred. Equivalent to an associate degree in criminal justice or a closely related field is desired.

Licenses and Certifications:

 Possession of, or ability to obtain, a valid California Driver’s License by time of appointment and a satisfactory driving record.
 Possession of a valid Cardiopulmonary Resuscitation (CPR) certificate is required at the time of appointment.

PHYSICAL DEMANDS
Must possess mobility to work in a standard office setting and use standard office equipment, including a computer; maintain physical standards, including mobility, physical strength, and stamina to respond to emergency situations; vision to read printed materials and a computer screen; and hearing and speech to communicate in person, before groups, and over the telephone or radio. The job involves fieldwork requiring frequent walking on uneven terrain and climbing and descending structures to identify problems or hazards. Finger dexterity is needed to access, enter, and retrieve data using a computer keyboard or calculator and to operate police services equipment. Positions in this classification frequently bend, stoop, kneel, reach, and climb to perform work and inspect work sites. Employees must possess the ability to lift, carry, push, and pull materials and objects necessary to perform job functions. 23 ENVIRONMENTAL CONDITIONS
Employees work indoors and outdoors, and are exposed to loud noise levels, cold and hot temperatures, inclement weather conditions, vibration, confining workspace, chemicals, mechanical and/or electrical hazards, and hazardous physical substances and fumes. Employees may interact with upset staff and/or public and private representatives in interpreting and enforcing departmental policies and procedures. The principal duties of this class are performed in a police station environment with exposure to criminal offenders, mentally ill individuals, and persons potentially infected with communicable diseases. 24 July 2025
FLSA: Non-Exempt
HOUSING SPECIALIST I/II (1 Year LTD)

DEFINITION
Under general supervision, the Housing Specialist I/II performs a variety of technical and administrative duties in support of the City’s affordable housing, rent stabilization, and anti-displacement programs. The position supports the development, implementation, and monitoring of housing policies, programs, and projects; provides information and assistance to residents, property owners, tenants, landlords, and developers; and supports the City’s efforts to increase, preserve, and manage affordable housing and to ensure compliance with local, state and federal housing regulations.

SUPERVISION RECEIVED AND EXERCISED
Receives general supervision from the Housing and Economic Development Manager. Exercises no direct supervision over staff.

DISTINGUISHING CHARACTERISTICS
Housing Specialist I:

This is the entry-level classification in the Housing Specialist series, learning to perform the full range of duties under close supervision.

Housing Specialist II:

This is the journey-level classification in the Housing Specialist series, expected to perform the full range of duties with minimal supervision. Incumbents are appointed to and/or progress to this level, from Housing Specialist I, as they demonstrate program and operational knowledge and the ability to analyze complex situations that deviate from the normal operation, and with the assistance from general policies, develop and implement solutions.

Positions in the Housing Specialist class series are flexibly staffed and positions at the II-level are normally filled by advancement from the I-level after gaining the knowledge, skill, and experience which meet the qualifications for and after demonstrating the ability to perform the work of the higher-level class.

EXAMPLES OF TYPICAL JOB FUNCTIONS (Illustrative Only)
Management reserves the right to add, modify, change, or rescind the work assignments of different positions and to make reasonable accommodations so that qualified employees can perform the essential functions of the job. Some duties may be performed by positions at the entry (I) level in a learning capacity.

• Assist in the administration and monitoring of affordable housing programs, including deed-restricted units, inclusionary housing, and rental assistance.
• Provide information and assistance to tenants, landlords, and the public regarding housing programs, tenant protections, and city housing policies.
• Conduct public outreach, community meetings, and educational activities to promote housing resources and services.
• Execute a communications strategy to increase transparency with the public, including website updates, newsletters, and email campaigns.
25 • Maintain accurate records and prepare reports related to housing activities and program outcomes. • Support the implementation of city housing policies, including rent stabilization, just cause eviction, and below-market-rate housing programs.
• Coordinate with other city departments, non-profit partners, and regional agencies on housing initiatives. • Respond to inquiries and complaints from residents, property owners, tenants, landlords, and developers related to housing issues, programs, policies and resources and provide appropriate referrals. • Support the implementation and ongoing administration of the citywide rent registry, including coordination with service providers.
• Provide technical assistance to participants and/or landlords regarding their obligation under the rental assistance program and applicable ordinances.
• Initiate appropriate sanctions against program participants and/or landlords for violation of program requirements.
• Ensure language access by arranging translation or interpretation services when needed; proficiency in Spanish is an added benefit.
• Monitor compliance with local, state, and federal housing regulations, including annual reporting and file audits.
• Coordinate with local non-profits, agencies, and regional patterns on housing initiatives and service delivery.
• Prepare and present staff reports, correspondence, and informational materials for the Rent Stabilization Board activities and City Council.
• Assist with the negotiating and monitoring of contracts, tracking and processing of invoices, requesting timely reports from vendors, and summarizing program outcomes for City Council. • Maintain accurate records and files of assigned projects and cases; monitor funds expended prepare a variety of periodic and special reports related to grant, loan and City-sponsored programs and projects; may provide input into annual budget requests and assist with monitoring the budget. • Develop, implement and maintain physical and digital filing systems for contract, invoices, tenant qualification, and related paperwork.
• Create and manage tracking systems for inclusionary housing projects, below-market rate units, and other housing programs.
• Assist with researching and securing new sources of regional, state and federal funding for housing programs, including but not limited to homelessness, housing preservation, first-time homebuyer, and more. • Assist in the coordination of special housing projects. • Assist in the development and implementation of housing loan programs. • Assist in calculating maximum allowable rents and sale prices of affordable housing units • Assist in maintaining an affordable housing seeker list. • Resolve conflicts between clients and contractors as needed. • Attend City Council Meetings, Planning Commission meetings, and Rent Stabilization Board meetings as necessary.
• Perform related duties and responsibilities as assigned.

JOB-RELATED QUALIFICATIONS
Some knowledge, skills, and abilities may be demonstrated by positions at the entry (I) level in a learning capacity:

Knowledge of:
• Analytical and report preparation methods and techniques. • Computer applications related to the work.
• Techniques for effectively dealing with people from various socio-economic, ethnic and age groups. • Standard office practices and procedures, including the use of standard office equipment. • Basic housing, real property development and real estate financing concepts, laws and techniques. • Knowledge of affordable housing programs, tenant/landlord law, and local housing policies. • Ability to interpret and apply housing regulations and program guidelines. • Strong communication, organizational, and customer service skills. • Experience with data entry, recordkeeping, and report preparation. • Bilingual skills (Spanish/English) desirable.
26 • Federal, state and local laws, rules and regulations relating to subsidized low-income housing and assistance programs.
• Community resource availability.
• Subsidized low-income services.
• Modern office practices and procedures.
• Budgetary principles and practices
• Methods and principles of grant application procedures and practices. • Current trends and developments in the area of housing. • Housing markets, real estate practices, housing law and related land use principles and policies. • Methods and principles of financing housing construction and rehabilitation. • Methods and techniques or research, statistical analysis and report presentation. • All computer applications and hardware related to performance of the essential functions of the job. • Recordkeeping, report preparation, filing methods and records management/retention techniques.

Ability to:
• Preparing clear and concise reports, correspondence and other written materials. • Using tact, discretion, initiative and independent judgment within established guidelines. • Organizing work, setting priorities, meeting critical deadlines, and following up on assignments with minimum direction.
• Applying logical thinking to solve problems or accomplish tasks; to understand, interpret and communicate complicated policies, procedures and protocols.
• Analyzing and resolving administrative situations and problems. • Researching, compiling, and summarizing a variety of informational and statistical data and materials. • Communicating clearly and effectively, both orally and in writing. • Preparing grant applications per established procedures. • Coordinating the services and enlisting the support of other department/divisions with the City and other governmental agencies.
• Bilingual skills would be desirable.
• Analyze, interpret, apply and explain various laws, rules, codes and regulations related to housing, economic and/or community development, including grant and loan administration. • Research and analyze technical and statistical data, evaluate alternatives and make sound recommendations. • Quickly learn the laws, rules and regulations and procedures related to the work. • Maintain accurate records and files.
• Coordinate multiple projects and meet critical deadlines. • Represent the City effectively in meetings with others. • Establish and maintain effective working relationships with a variety of individuals. • Monitor annual activities and ensure timely completion. • Write clear, concise and accurate reports, correspondence and written materials. • Speak effectively before groups.
• Analyze situations effectively and adopt or recommend appropriate course of action. • Define problems, collect data, establish facts and draw valid conclusions. • Promote teamwork among colleagues.
• Perform the essential functions of the classification. • Ability to pass a comprehensive background investigation, DOJ/FBI fingerprint clearance, and drug screening examination.

Education and Experience:

Any combination of training and experience that would provide the required knowledge, skills, and abilities is qualifying. A typical way to obtain the required qualifications would be:

Equivalent to graduation from a four-year college or university with major coursework in public or business administration, finance, economics, political science, or a field related to the work. Experience in housing program or community development staff support may be substituted for the education on a year for year basis to a minimum of two years.
27 Housing Specialist I: One year of administrative support experience, preferably in a setting that provides a knowledge of housing and/or community development concepts and terminology.

Housing Specialist II: In addition to the above, two years of increasingly responsible experience in administering housing and/or community development programs and projects at a level equivalent to the City’s class of Housing Specialist I.

Licenses and Certifications:
• The ability to convey oneself to and from geographical locations frequently and timely. • If operating City vehicle, possession of, or ability to obtain, a valid California Driver’s License (Class C) and a satisfactory driving record.

PHYSICAL DEMANDS
Must possess mobility to work in a standard office setting and use standard office equipment, including a computer, and to operate a motor vehicle to visit various City and meeting sites; vision to read printed materials and a computer screen; and hearing and speech to communicate in person and over the telephone.

Standing in and walking between work areas is frequently required. Finger dexterity is needed to access, enter, and retrieve data using a computer keyboard or calculator and to operate standard office equipment.

Positions in this classification frequently bend, stoop, kneel, and reach to perform assigned duties, as well as push and pull drawers open and closed to retrieve and file information. Employees must possess the ability to lift, carry, push, and pull materials and objects up to 25 pounds with the use of proper equipment.

Reasonable accommodations will be made for individuals on a case-by-case basis.

ENVIRONMENTAL CONDITIONS
Employees work in an office environment with moderate noise levels, controlled temperature conditions, and no direct exposure to hazardous physical substances. Employees also work in the field and may be exposed to loud noise levels, cold and hot temperatures, inclement weather conditions, road hazards, rough terrains, vibration, mechanical and/or electrical hazards, and hazardous physical substances and fumes.

Employees may interact with upset staff and/or public and private representatives in interpreting and enforcing departmental policies and procedures.
28 29
30 31
CONSENT ITEM 3.2

EAST PALO ALTO

CITY COUNCIL

STAFF REPORT
DATE: July 29, 2025
TO: Honorable Mayor and Members of the City Council
VIA: Melvin E. Gaines, City Manager
BY: James Colin, City Clerk
SUBJECT: Ecumenical Hunger Program (EHP) Proclamation
Recommendation
Present the proclamation for the Ecumenical Hunger Program (EHP).

Attachments

1. Proclamation
32 PROCLAMATION OF THE CITY COUNCIL OF THE CITY OF

EAST PALO ALTO HONORING THE ECUMENICAL HUNGER
PROGRAM FOR 50 YEARS OF OUTSTANDING COMMUNITY

SERVICE
WHEREAS, the Ecumenical Hunger Program (EHP) was founded in 1975 by Miriam Nixon Hope and Church Women United as a grassroots effort to distribute surplus food to neighborhood pantries, and was formally incorporated in 1978 as a nonprofit organization; and WHEREAS, under the dedicated leadership of Nevida Butler, EHP began providing direct services in 1981 until 2008 and has since grown into the largest direct emergency food provider serving East Palo Alto and Menlo Park, distributing not only food but also clothing, furniture, and household goods, while offering case management, referrals, and advocacy for those in need; and WHEREAS, EHP offers a wide range of vital food programs, including emergency food assistance, hot lunches through a partnership with other local agencies, individual food bags for the unhoused, and fresh produce distribution from both Second Harvest Silicon Valley and its own organic garden; and
WHEREAS, EHP’s Program provides nutritious, easy-to-prepare food to children at risk of hunger, and its Snack Bag Program helps ensure that youth have access to meals beyond school hours, promoting stability and well-being for local students; and WHEREAS, EHP supports children and families through its Back-to-School program, holiday gift and food distributions, the Cake4Kids birthday program, and the Family Sharing Program – providing personalized gifts and support to families facing hardship during the holidays; and WHEREAS, under its current leadership of Lesia Preston during the last 15 years; EHP remains rooted in its founding values of dignity, equity, and compassion, continuing to offer customized, culturally sensitive services that reflect the diverse needs of the community, while expanding its programs and volunteer efforts across generations.

NOW, THEREFORE, BE IT PROCLAIMED, that the City Council of the City of East Palo Alto hereby honors and commends the Ecumenical Hunger Program for its 50 years of extraordinary service, its unwavering dedication to equity and food justice, and its transformative role in supporting families and individuals in East Palo Alto and beyond.
_________________________
____
Martha Barragan
Mayor
33 CONSENT ITEM 3.3

EAST PALO ALTO

CITY COUNCIL

STAFF REPORT
DATE: July 29, 2025
TO: Honorable Mayor and Members of the City Council
VIA: Melvin E. Gaines, City Manager
BY: Batool Zaro, Senior Engineer
Humza Javed, Public Works Director
SUBJECT: Grant Application for the 2025 Cycle 3 Transportation Demand Management (TDM) Program
Recommendation
Adopt a resolution:

1. Supporting the Transportation Demand Management (TDM) Program Refinement and Implementation Project by authorizing the City Manager to submit an application to the San Mateo County Transportation Authority for the 2025 Cycle 3 TDM Program Funding program for a $150,000 grant for the TDM Program Refinement and Implementation Project and take all actions necessary to give effect to the resolution, including appropriating $7,895 in matching funding and execute legal documents to secure the grant funding; and

2. Finding that the proposed action does not constitute a “project” with the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that it is a governmental fiscal, organizational or administrative activity that will not result in direct or indirect changes in the environment.

Alignment with City Council Strategic Plan
This recommendation is primarily aligned with:

Priority: Public Health, Safety, and Quality of Life
Background
34 CONSENT ITEM 3.3
The San Mateo County Transportation Authority (TA) issued a Call for Projects for the Measure A Alternative Congestion Relief & Measure W Transportation Demand Management (ACR/TDM) Program on June 5, 2025. The Cycle 3 TDM Program will release approximately $7.97 million in available Measure A and W funds. The program aims to encourage the use of sustainable transportation options and enhance mobility across San Mateo County.

Staff proposes to apply for a project that will refine and implement the City’s Transportation Demand Management (TDM) Ordinance, which was adopted June 1, 2021. The ordinance can be found here:
https://www.cityofepa.org/publicworks/page/transportation-demand-management-tdm Analysis
On May 17, 2022, the City Council authorized a contract with Cities21 for TDM program administration. Cities21 is a professional working for better transit, greater urban livability, and reduced pollution, including elements such as transit villages, real estate in-fill, workforce housing, automated transit, and wireless connection-making software. Over the last few years Cities21 has assisted the City in implementing our TDM ordinance. The contract with Cities21 expired in June 2025, and is being extended to allow for program monitoring.

City staff have identified next steps associated with the TDM Program implementation and additional support for the next phase is needed. Staff is requesting $150,000 from the TA for the refinement and implementation of the City’s TDM Ordinance as well as to develop TDM projects/actions for the City to implement.

The scope will include, but is not limited to, revising/amending the ordinance and program guidelines, the review of TDM plans for compliance, coordinating with San Mateo County on TDM requirements, and reviewing annual TDM plans.

Fiscal Impact
There is no fiscal impact associated with submitting the application; however, the grant includes a minimum funding match of $7,895 which can be covered by Measure M funds.

Public Notice
The public was provided notice by making the agenda and report available on the City’s website and on a bulletin board located at City Hall: 2415 University Avenue, East Palo Alto.

Environmental
The proposed action does not constitute a “project” with the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that it is a governmental fiscal, organizational or administrative activity that will not result in direct or indirect changes in the environment.
35 CONSENT ITEM 3.3
Government Code § 84308
Applicability of Levine Act: No, as the proposed action does not involve an entitlement.

Analysis of Levine Act Compliance: Not applicable.

Attachments

1. Resolution.
36 Resolution No. XX-2025 1 of 3
RESOLUTION NO. XX– 2025

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF EAST PALO ALTO

SUPPORTING THE TRANSPORTATION DEMAND MANAGEMENT (TDM) PROGRAM

REFINEMENT AND IMPLEMENTATION PROJECT BY AUTHORIZING THE CITY MANAGER TO SUBMIT AN APPLICATION TO THE CYCLE 3 SAN MATEO COUNTY TRANSPORTATION

AUTHORITY FOR MEASURE A ALTERNATIVE CONGESTION RELIEF AND MEASURE W TRANSPORTATION DEMAND MANAGEMENT FUNDING PROGRAM FOR A $150,000

GRANT FOR THE TDM PROGRAM REFINEMENT AND IMPLEMENTATION PROJECT AND

TAKE ALL ACTIONS NECESSARY TO GIVE EFFECT TO THE RESOLUTION, INCLUDING APPROPRIATING $7,895 IN MATCHING FUNDING AND EXECUTE LEGAL DOCUMENTS TO

SECURE THE GRANT FUNDING
WHEREAS, on June 1, 2021, the City adopted a Transportation Demand Management (TDM) Ordinance (first reading on May 18, 2021); and
WHEREAS, the City Council approved TDM Program Implementation Guidelines for residential and nonresidential developments on May 18, 2021; and
WHEREAS, on May 17, 2022, the City Council authorized a contract with Cities21 for TDM program administration; and
WHEREAS, the TDM program administration contract expired in June 2025; and WHEREAS, the City of East Palo Alto has identified next steps associated with the TDM Program implementation; and
WHEREAS, the City has developed the TDM Program Refinement and Implementation Project (Project) to refine and implement the adopted TDM ordinance as well as to develop TDM projects/actions for the City to implement; and
WHEREAS, it will cost approximately $150,000 to continue program refinement and implementation; and
WHEREAS, the San Mateo County Transportation Authority (TA) issued a Call for Projects for the Measure A Alternative Congestion Relief & Measure W Transportation Demand Management (ACR/TDM) Program on June 5, 2025; and
WHEREAS, a Primary Grant Agreement has been executed between the Sponsor (City of East Palo Alto) and the TA on May 12, 2025; and
WHEREAS, the TA requires the Sponsor’s governing board to adopt a resolution:

1. Supporting the Project and application for $150,000 in TA TDM Program funds for the Project;

2. Committing the Sponsor to the completion of the Project, including the commitment of matching funds in the amount of $7,895 needed for implementation; 37 Resolution No. XX-2025 2 of 3

3. Certifying that any funds awarded by the San Mateo County Transportation Authority will be used to supplement existing funds for program activities, and will not replace existing funds or resources;

4. If funds are awarded, authorizing the City Manager, or designee, to sign a project supplement with the TA for TDM Program funding for the Project and to take any other actions necessary to give effect to this resolution; and

5. Committing to commence work on the Project, if awarded, within one year of the TA Board of Directors allocating 2025 Cycle 3 TDM Program funding.

NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF EAST PALO ALTO HEREBY:

1. Directs staff to submit an application for TA TDM Program funds for $150,000 for the TDM Program Refinement and Implementation Project.

2. Authorizes the City Manager, or his/her designee, to execute a project supplement with the San Mateo County Transportation Authority to encumber any TDM Program funds awarded.

3. Commits to the completion of the Project, including the commitment of $7,895 of matching funds needed for implementation, if awarded the requested TA funds.

4. Certifies that any funds awarded by the TA will be used to supplement existing funds for the Project and will not replace existing funds or resources.

5. Commits to commencing work on the Project, if awarded, within one year of the TA Board of Directors allocating the 2025 Cycle 3 TDM Program funds.

6. Authorizes the City Manager to take any other actions necessary to give effect to this resolution.

PASSED AND ADOPTED this 29th day of July 2025, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Martha Barragan, Mayor
ATTEST: APPROVED AS TO FORM:
38 Resolution No. XX-2025 3 of 3
James Colin, City Clerk John D. Lê, City Attorney
39 COUNCIL REPORTS 3.4

EAST PALO ALTO

CITY COUNCIL

STAFF REPORT
DATE: July 29, 2025
TO: Honorable Mayor and Members of the City Council
BY: John D. Lê, City Attorney
SUBJECT: Approval of Settlement Agreement
Recommendation
By motion, approve and authorize the City Attorney to sign a settlement agreement in the matter of Sandra Floyd v. City of East Palo Alto (24-CIV-00140).

Alignment with City Council Strategic Plan
This recommendation is primarily aligned with:

Priority: Governance, Organizational Strength, and Fiscal Sustainability Background
On February 26, 2024, the City Manager’s Office was served with a lawsuit by and through Ms.

Moira C. McQuaid, who represents Ms. Sandra Floyd.

The city employed Ms. Floyd as its Human Resources Manager from March 1, 2022, until November 28, 2022.

The city retained legal counsel Serena Warner of Angelo, Kilday & Killduff, LLP. In April 2025, the case went to mediation before mediator Tamara Lange (JAMS). Mediation did not lead to a settlement proposal at that time.

Analysis
As reported to the City Council on May 6, 2025, the parties participated in mediation but were unable to settle the matter. The City Attorney’s Office has engaged in additional settlement discussions with Ms. Floyd’s legal counsel to explore a potential settlement. Recently, the 40 COUNCIL REPORTS 3.4
Council met in closed session to consider settlement options. At that time, direction was given to staff concerning how to proceed with settlement.

The City Attorney returns to open session to approve the agreement.

Fiscal Impact
The proposed settlement would involve payment of $80,000.

Public Notice
The public was provided notice by making the agenda and report available on the City’s website and on a bulletin board located at City Hall: 2415 University Avenue, East Palo Alto.

Environmental
The proposed action does not constitute a “project” with the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that it is a governmental fiscal, organizational or administrative activity that will not result in direct or indirect changes in the environment.

Government Code § 84308
Applicability of Levine Act: No, as the proposed action is specifically exempted under the Levine Act.

Analysis of Levine Act Compliance: Not applicable.

Attachments

1. Settlement Agreement
41 CONSENT ITEM 3.5

EAST PALO ALTO

CITY COUNCIL

STAFF REPORT
DATE: July 29, 2025
TO: Honorable Mayor and Members of the City Council
VIA: Melvin E. Gaines, City Manager
BY: James Colin, City Clerk
SUBJECT: City Council Meeting Minutes
Recommendation
Adopt July 15, 2025, City Council Meeting Minutes.

Attachments

1. July 15, 2025, Minutes.
42 EAST PALO ALTO CITY COUNCIL

REGULAR SESSION MINUTES
Tuesday, July 15, 2025, 6:30 PM
EPA Government Center
2415 University Avenue, First Floor
East Palo Alto, CA 94303

1. CALL TO ORDER AND ROLL CALL
The City Council meeting was called to order by Mayor Barragan at 6:37 PM.

Attendee Name Title Status Left
Martha Barragan Mayor Present
Mark Dinan Vice Mayor Present
Carlos Romero Councilmember Present
Ruben Abrica Councilmember Present/ Left Early Approximately 10:30 PM Webster Lincoln Councilmember Present

2. APPROVAL OF THE AGENDA
A motion to approve the agenda was made by Councilmember Romero, seconded by Vice Mayor Dinan, and passed unanimously.

3. APPROVAL OF CONSENT CALENDAR
City Clerk, James Colin, pulled items 3.2 and asked for it to be continued to the next City Council meeting.

A motion to approve the consent calendar except item 3.2 was made by Mayor Barragan, seconded by Vice Mayor Dinan, and passed unanimously.

3.1 American Muslim Appreciation & Awareness Month Proclamation

3.2 Ecumenical Hunger Program (EHP) Proclamation

3.3 Contract Amendment Number One with Golden State Construction and Utility, Inc.

4. CLOSED SESSION

5. PUBLIC COMMENT
Gail Dixon provided a public comment.

6. INFORMATIONAL REPORTS

6.1 Economic Development Strategic Plan – Project Update & Existing Conditions
43 Denise Garcia, Assistant to the City Manager, Judith Taylor, Laura Kim and Brian M HR&A Advisors, Inc. provided a presentation on item 6.1.

Staff answered questions posed by Councilmembers.

The following speakers provided a public comment:
- Gail Dixon
- Michael Mashack

7. ADJOURN CITY COUNCIL REGULAR MEETING TO THE EAST PALO

ALTO SANITARY DISTRICT BOARD MEETING

8. APROVAL OF THE EPASD BOARD MEETING AGENDA
A motion to approve the agenda was made by Board President Dinan, seconded by Vice president Barragan, and passed unanimously.

9. EPASD BOARD MEETING PUBLIC COMMENT
Gail Dixon provided a public comment.

10. EPASD BOARD MEETING PUBLIC HEARING

10.1 2025 Sewer System Master Plan
Humza Javed, Public Works Director, and Jeffery Tarantino, Consulting Civil Engineer provided a presentation on item 10.1 and answered questions posed by the board.

The following speakers provided public comments:
- Gail Dixon
- Mike Kramer
A motion to continue item 10.1 to the next board meeting was made by Board member Lincoln, seconded by Vice president Barragan, and passed unanimously.

11. EPASD BOARD REPORTS

12. ADJOURN EAST PALO ALTO SANITARY DISTRICT BOARD MEETING

AND RECONVENE CITY COUNCIL REGULAR MEETING

13. POLICY AND ACTION

13.1 Accept Evaluation Report on Measure HH Pilot Workforce Development Program and Authorize Issuance of a Request for Proposals to Continue the Program
Hanson Hom, Deputy Manager Special Projects, provided a presentation on item

13.1. 44
Kwanee Womack from JobTrain, Heather Starnes from Live in Peace, Juanita Kroft from Street Code, and Evan Gattozzi from Informing Change provided updates on their organizations in relation to item 13.1.

A motion to approve the consent calendar except item 13.1 was made by Councilmember Romero, seconded by Vice Mayor Dinan, and passed unanimously.

14. PUBLIC HEARINGS

14.1 FY 25-26 Inclusionary In-Lieu Fee Update
Yajaira Morales, Housing Project Manager, provided a presentation on item 14.1.

Mike Kramer provided a public comment.

A motion to approve item 14.1 was made by Councilmember Romero and seconded by Vice Mayor Dinan and passed unanimously.

14.2 Cost Allocation Plan and User Fee reports and amendment to City’s Master Fee Schedule – Continued from June 17, 2025
Tomo Oku, Finance Director, provided a presentation on item 14.2.

Mike Kramer and Jeff Poetsch provided a public comment.

A motion to approve Item 14.2 was made by Councilmember Romero and seconded by Councilmember Dinan. The motion failed, with Mayor Barragan and Councilmember Lincoln abstaining, Vice Mayor Dinan voting no, Councilmember Romero voting yes, and Councilmember Abrica absent.

Subsequently, a motion to continue Item 14.2 to the next City Council meeting was made by Councilmember Lincoln and seconded by Vice Mayor Dinan. The motion passed with Mayor Barragan, Vice Mayor Dinan, and Councilmember Lincoln voting yes, Councilmember Romero voting no, and Councilmember Abrica absent.

15. COUNCIL REPORTS

16. ADJOURNMENT
The meeting was adjourned at 11:13 PM
45 CONSENT ITEM 3.6

EAST PALO ALTO

CITY COUNCIL

STAFF REPORT
DATE: July 29, 2025
TO: Honorable Mayor and Members of the City Council
VIA: Melvin E. Gaines, City Manager
BY: Jeff Liu, Chief of Police
SUBJECT: Purchase of Two Police Patrol Vehicles
Recommendation
Adopt a resolution:

1. Authorizing the City Manager to purchase two 2025 Dodge Durango Police Vehicles from Elk Grove Auto Group for the Police Department in an amount not to exceed $116,954.26; and

2. Approve the purchase under an exception to formal bidding procedures pursuant to East Palo Alto Municipal Code Section 2.84.0740(DL); and

3. Find that the proposed action does not constitute a “project” with the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that it is a governmental fiscal, organizational or administrative activity that will not result in direct or indirect changes in the environment.

Alignment with City Council Strategic Plan
This recommendation is primarily aligned with:

Priority No. 1: Enhance Public Safety and Emergency Preparedness Background
46 CONSENT ITEM 3.6
On December 6, 2005, the City Council adopted Resolution No. 2532A, which established the City’s Vehicle Fleet and Replacement Guidelines. These Guidelines outline the standards by which the City replaces its vehicles. According to the Guidelines, patrol vehicles shall be replaced at five years or 100,000 miles (December 6, 2005 Staff Report and Resolution No. 2532A). This policy ensures City patrol vehicles remain operable with reasonable maintenance. This policy also ensures police vehicles are safe and effective, especially considering the high-risk nature of police driving.

The City considered purchasing two new 2025 Dodge Durango Police Vehicles for $116,954.26 to replace two vehicles that exceed the vehicle age and mileage limits set by City of East Palo Alto City Council Resolution Number 2532A.

Analysis
The purchase of these two vehicles will allow the Department to continue safe, effective and efficient management of its police vehicle fleet.

If Council approves the purchase of these vehicles, the City will replace two vehicles that are over five years old and/or have over 100,000 miles of service. After the Police Department puts the new vehicles into service, the vehicles being replaced will be mechanically assessed to determine whether they can be used as non-emergency City vehicles or for spare parts. If either replaced vehicle has no value, it will be disposed of in a manner approved by the City Manager.

The City proposes to purchase the vehicles for $116,954.26 from Elk Grove Auto Group, a contractor on the State of California Statewide Contracts for Fleet Vehicles list. This list provides fleet vehicles at contracted pricing to the State of California and local governmental agencies. Elk Grove Auto’s contract #1-22-23-23E with the State has a term through April 30, 2026. Local governmental agencies have the same rights and privileges as the State under the terms of this contract, including pricing.

Staff recommends that the City Council approve this exception to the formal bidding requirements for this purchase in favor of using the State’s Statewide Contracts for Fleet Vehicles pursuant to Section 2.84.040(L) for piggybacking. The State of California’s contract with Elk Grove Auto’s (Contract #1-22-23-23E) conforms to the State bid specifications, which was competitively bid. Additionally, pricing under this bid was updated in June 2023.

Accordingly, it is not likely that conducting a new bid process for the purchase of these two vehicles will result in a lower price to the City. Thus, the City Manager therefore recommends proceeding under this exception to formal bid procedure under East Palo Alto Municipal Code Section 2.84.040(L).
1 1
“When other special circumstances require, and the City Manager recommends disregarding bid procedures, and City Council approval is obtained to disregard bid procedures and which expressly authorizes negotiations with one or more firms, persons, corporations, partnerships and/or associates for entities.” EPAMC 2.84.070(D).
47 CONSENT ITEM 3.6
Fiscal Impact
The fiscal impact is $116,954.26 from the General Fund. For the Fiscal Year 2025-26 budget, the Police Department budgeted $120,500 for vehicle purchases, which is adequate for these purchases.

Public Notice
The public was provided notice of this agenda item by posting the City Council agenda on the City’s official bulletin outside City Hall and making the agenda and report available at the City’s website and the San Mateo County Library at 2415 University Avenue.

Environmental
The proposed action does not constitute a “project” with the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that it is a governmental fiscal, organizational or administrative activity that will not result in direct or indirect changes in the environment.

Government Code § 84308
Applicability of Levine Act: Yes.

Analysis of Levine Act Compliance: The signatory for the agreements is Andrew Villareal of Elk Grove Auto. Staff is unaware of any other parties or participants relevant to the Council’s consideration of this item.

Attachments

1. Resolution

2. Quote
48 Draft 1
Resolution No. XX-2025 1 of 2
RESOLUTION NO.______

A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF EAST PALO ALTO
AUTHORIZING THE CITY MANAGER TO PURCHASE TWO 2025 DODGE DURANGO POLICE

VEHICLES FOR THE EAST PALO ALTO POLICE DEPARTMENT, IN AN AMOUNT NOT TO EXCEED $116,956.26.

WHEREAS, the City Council adopted Resolution No. 2532A, which established the Vehicle Fleet and Replacement Guidelines (Guidelines) for city vehicle replacements; and WHEREAS, the replacement guidelines require the Police Department to replace patrol vehicles at five years or 100,000 miles; and
WHEREAS, pursuant to the Guidelines, it is necessary for the Police Department to purchase two Dodge Durango police patrol vehicles to ensure the safe effective and efficient management of its police vehicle fleet; and
WHEREAS, the Elk Grove Auto Group holds the State Bid contract #1-22-23-23E as the qualified vendor; and
WHEREAS, the City considered purchasing two new 2025 Dodge Durango Police Vehicles for $116,954.26 to replace two vehicles that exceed the vehicle age and mileage limits set by City of East Palo Alto City Council Resolution Number 2532A.; and
WHEREAS, the City Manager therefore recommends proceeding under an exception to formal bidding procedures pursuant to East Palo Alto Municipal Code Section 2.84.040(L) for piggybacking.

NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF EAST PALO ALTO HEREBY authorizes the City Manager to:

1. Accept the State bid from Elk Grove Auto Group for the purchase of two 2025 Dodge Durango Police Vehicles for the Police Department in an amount not to exceed $116,956.26 total for both vehicles;

2. Approve the purchase under an exception to formal bidding procedures pursuant to East Palo Alto Municipal Code Section 2.84.040(L); and

3. Finding that the proposed action does not constitute a “project” with the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines sections 15378(b)(4) and (5) in that it is a governmental fiscal, organizational or administrative activity that will not result in direct or indirect changes in the environment.

PASSED AND ADOPTED this 29th day of July 2025, by the following vote:

AYES:
49 Draft 1
Resolution No. XX-2025 2 of 2
NOES:

ABSENT:

ABSTAIN:

Martha Barragan, Mayor
ATTEST: APPROVED AS TO FORM:

James Colin, City Clerk John D. Lê, City Attorney
50 Elk Grove Auto DATE February 5, 2025
To: Jason Peardon Quotation # 4219
East Palo Alto PD
(916)509-8598 - Desk
(916)792-3672 - Cell
Prepared by: Andrew Villareal
(650) 521-1938
Comments or special instructions: Vehicle build and options are in additional pages.

AMOUNT
$ 43,576.00
$ 8,460.00
$ (1,226.00)
$ 2,000.00
$ 52,810.00
DOC Fee $ 85.00
Taxable Subtotal: $ 52,895.00

9.875% $ 5,223.38
Tire Fee: $8.75
$ 350.00
Total: $ 58,477.13
QTY 2 Grand Total $ 116,954.26
8575 Laguna Grove Dr.

Elk Grove, CA 95757
State Contract # 1-22-23-23E
****Shipping charge added for deliveries beyond Sacramento. No charge for will call.**** CA Tire Fee: $1.75 / Per Tire
Tax Rate(Subject to change):

Description
Pursuit Credit
(Order Acknowledgment Signature) (Date)
If you have any questions concerning this quotation, contact Andrew Villareal at (916)509-8598 or email at [email protected]
Line #2 2025 Dodge Durango AWD
Options (Refer to Window Sticker):

Delivery Charge:
**** specs with the PO or the vehicle will not be ordered. **** Subtotal
**** Please review, sign, and return a copy of the quote and **** Paint 2 Doors and Roof White
___________________________________________________
THANK YOU FOR YOUR BUSINESS!
51 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 1
Note:Photo may not represent exact vehicle or selected equipment. [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23)
Prepared By
Andrew Villareal
Winner Chevrolet / Elk Grove Auto Group
916-509-8598-Desk
916-792-3672-Cell
[email protected]
52 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 2
Table of Contents
• Vehicle Image
• Dealership Information
• Window Sticker
• Standard Equipment
• Weight Rating
• Technical Specifications
53 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 3
Dealership Information
***PLEASE REVIEW THE "WINDOW STICKER," QUOTE, AND ALL INCLUDED INFORMATION AND SPECIFICATIONS FOR ACCURACY. IF A PURCHASE ORDER IS ISSUED, PLEASE INCLUDE A SIGNED COPY OF THIS QUOTE WITH THE "WINDOW STICKER." BY THIS QUOTE

BEING SIGNED AND RETURNED BY THE PURCHASING AGENCY, THE PURCHASING

AGENCY ACKNOWLEDGES THAT THE VEHICLE CONFIGURATION AND PRICE ARE ACCURATE.******TAX IS NOT INCLUDED IN THE QUOTE PRICE. PURCHASING AGENCY IS RESPONSIBLE FOR CALCULATING TAX. THE TAX RATE IS BASED ON THE REGISTRATION ADDRESS AND CANNOT BE A PO BOX. ******IF THE VEHICLE IS GOING TO BE DELIVERED BEYOND F.O.B. SACRAMENTO, ADDITIONAL COST WILL BE REQUIRED. *** Thanks!
Prepared By:

Andrew Villareal
Winner Chevrolet / Elk Grove Auto Group
(916)509-8598
[email protected]
54 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 4
Window Sticker

SUMMARY
[Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD
Interior:Black, Cloth Bucket Seats w/Shift Insert
Exterior 1:DB Black Clearcoat
Exterior 2:No color has been selected.

Engine: 3.6L V6 24V VVT UPG I w/ESS
Transmission: 8-Speed Automatic (850RE)

OPTIONS

CODE MODEL MSRP
WDEE75 [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD

OPTIONS
2BZ Quick Order Package 2BZ $0.00
ADL Skid Plate Group $370.00
C5X9 Black, Cloth Bucket Seats w/Shift Insert $0.00
CW6 Deactivate Rear Doors/Windows $145.00
DFT Transmission: 8-Speed Automatic (850RE) $0.00
DLK 3.45 Rear Axle Ratio $0.00
ERC Engine: 3.6L V6 24V VVT UPG I w/ESS $0.00
GXF Entire Fleet Alike Key (FREQ 1) $455.00
LNA Black Right LED Spot Lamp $750.00
LNF Black Left LED Spot Lamp $750.00
MT8 Delete Liftgate Badge $0.00
PXJ DB Black Clearcoat $0.00
WBN Wheels: 18" x 8.0" Black Steel $0.00
XDG Passenger Side Ballistic Door Panel $2,995.00
XDV Driver Side Ballistic Door Panel $2,995.00
Z6K GVWR: 6,500 lbs $0.00
55 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 5

FUEL ECONOMY
Est City:17 MPG
Est Highway:24 MPG
Est Highway Cruising Range:590.40 mi
56 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 6
Standard Equipment
Mechanical
Engine: 3.6L V6 24V VVT UPG I w/ESS (STD)
Transmission: 8-Speed Automatic (850RE) (STD)

3.45 Rear Axle Ratio (STD)
GVWR: 6,500 lbs (STD)
50 State Emissions
Transmission w/Sequential Shift Control
Full-Time All-Wheel
Engine Oil Cooler
650CCA Maintenance-Free Battery w/Run Down Protection
220 Amp Alternator
Class IV Towing Equipment -inc: Hitch and Trailer Sway Control Trailer Wiring Harness
Police/Fire
1250# Maximum Payload
Front And Rear Anti-Roll Bars
Gas-Pressurized Front Shock Absorbers and Nivomat Brand Name Rear Shock Absorbers Nivomat Suspension
HD Suspension
Electric Power-Assist Speed-Sensing Steering

24.6 Gal. Fuel Tank
Single Stainless Steel Exhaust
Permanent Locking Hubs
Short And Long Arm Front Suspension w/Coil Springs
Multi-Link Rear Suspension w/Coil Springs
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist and Hill Hold Control Exterior
Wheels: 18" x 8.0" Black Steel (STD)
Tires: 255/60R18 BSW On/Off Road
Wheels w/Chrome Hub Covers
57 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 7
Exterior
Steel Spare Wheel
Compact Spare Tire Stored Underbody w/Crankdown
Clearcoat Paint
Body-Colored Front Bumper w/Colored Rub Strip/Fascia Accent Body-Colored Rear Step Bumper w/Colored Rub Strip/Fascia Accent Black Side Windows Trim
Body-Colored Door Handles
Chrome Bodyside Insert and Colored Wheel Well Trim
Black Power Heated Side Mirrors w/Manual Folding
Fixed Rear Window w/Fixed Interval Wiper and Defroster
Deep Tinted Glass
Speed Sensitive Variable Intermittent Wipers
Galvanized Steel/Aluminum Panels
Lip Spoiler
Black Grille
Liftgate Rear Cargo Access
Tailgate/Rear Door Lock Included w/Power Door Locks
Auto On/Off Projector Beam Led Low/High Beam Daytime Running Headlamps w/Delay-Off Perimeter/Approach Lights
LED Brakelights
Laminated Glass
Entertainment
Radio w/Seek-Scan, Clock, Speed Compensated Volume Control, Aux Audio Input Jack, Steering Wheel Controls and Radio Data System
Radio: Uconnect 4 w/8.4" Display
6 Speakers
Streaming Audio
GPS Antenna Input
Integrated Center Stack Radio
Integrated Voice Command w/Bluetooth
2 LCD Monitors In The Front
58 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 8
Interior
Front Seats w/Power 4-Way Driver Lumbar
12-Way Power Driver Seat -inc: Power Recline, Height Adjustment, Fore/Aft Movement, Cushion Tilt and Power 4-Way Lumbar Support
4-Way Passenger Seat -inc: Manual Recline, Fore/Aft Movement and Fold Flat 60-40 Folding Split-Bench Front Facing Fold Forward Seatback Rear Seat Manual Tilt/Telescoping Steering Column
Gauges -inc: Speedometer, Odometer, Voltmeter, Oil Pressure, Engine Coolant Temp, Tachometer, Oil Temperature, Transmission Fluid Temp, Engine Hour Meter, Trip Odometer and Trip Computer Power Rear Windows and Fixed 3rd Row Windows
Leather Steering Wheel
Front Cupholder
Rear Cupholder
Compass
Proximity Key For Doors And Push Button Start
Valet Function
Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry and Panic Button Cruise Control w/Steering Wheel Controls
Voice Activated Dual Zone Front Automatic Air Conditioning Rear HVAC w/Separate Controls
HVAC -inc: Auxiliary Rear Heater, Headliner/Pillar Ducts and Console Ducts Illuminated Locking Glove Box
Driver Foot Rest
Interior Trim -inc: Leatherette/Metal-Look Instrument Panel Insert, Metal-Look Door Panel Insert and Chrome Interior Accents
Full Cloth Headliner
Cloth Bucket Seats w/Shift Insert -inc: cloth rear seat Day-Night Auto-Dimming Rearview Mirror
Driver And Passenger Visor Vanity Mirrors
Partial Floor Console w/Covered Storage, Mini Overhead Console w/Storage and 3 12V DC Power Outlets Front And Rear Map Lights
Fade-To-Off Interior Lighting
Carpet Floor Trim
59 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 9
Interior
Full Vinyl/Rubber Floor Covering
Cargo Area Concealed Storage
Cargo Space Lights
Smart Device Integration
FOB Controls -inc: Cargo Access and Windows
Google Android Auto
USB Host Flip
Apple CarPlay
Driver / Passenger And Rear Door Bins
Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down Delayed Accessory Power
Power Door Locks w/Autolock Feature
Driver Information Center
Redundant Digital Speedometer
Trip Computer
Outside Temp Gauge
Digital/Analog Appearance
Front Center Armrest w/Storage and Rear Center Armrest
#7 Seat Foam Cushion
Manual w/Tilt Front Head Restraints and Fixed Rear Head Restraints Sentry Key Immobilizer
3 12V DC Power Outlets
Air Filtration
Safety-Mechanical
Electronic Stability Control (ESC) And Roll Stability Control (RSC) ABS And Driveline Traction Control
Safety-Exterior
Side Impact Beams
Safety-Interior
Dual Stage Driver And Passenger Seat-Mounted Side Airbags ParkSense with Stop Rear Parking Sensors
60 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 10
Safety-Interior
Rear Cross Path Detection
Blind Spot w/Trailer Detection Blind Spot
Tire Specific Low Tire Pressure Warning
Dual Stage Driver And Passenger Front Airbags
Curtain 1st, 2nd And 3rd Row Airbags
Airbag Occupancy Sensor
Driver Knee Airbag
Rear Child Safety Locks
Outboard Front Lap And Shoulder Safety Belts -inc: Rear Center 3 Point, Height Adjusters and Pretensioners ParkView Back-Up Camera

WARRANTY
Basic Years: 3
Basic Miles/km: 36,000
Drivetrain Years: 5
Drivetrain Miles/km: 100,000
Corrosion Years: 5
Corrosion Miles/km: Unlimited
Roadside Assistance Years: 5
Roadside Assistance Miles/km: 60,000
61 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 11
Weight Ratings

WEIGHT RATINGS
Front Gross Axle Weight Rating: N/A
Rear Gross Axle Weight Rating: N/A
Gross Vehicle Weight Rating: 6500.00 lbs
62 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 12
Technical Specifications
Powertrain
Transmission
Drivetrain All Wheel Drive Trans Order Code DFT
Trans Type 8 Trans Description Cont. Automatic w/OD
Trans Description Cont. Again N/A First Gear Ratio (:1) 4.71 Second Gear Ratio (:1) 3.14 Third Gear Ratio (:1) 2.11
Fourth Gear Ratio (:1) 1.67 Fifth Gear Ratio (:1) 1.28
Sixth Gear Ratio (:1) 1.00 Reverse Ratio (:1) 3.29
Clutch Size N/A Trans Power Take Off N/A
Final Drive Axle Ratio (:1) N/A Transfer Case Model None Transfer Case Gear Ratio (:1), High N/A Transfer Case Gear Ratio (:1), Low N/A Transfer Case Power Take Off No Seventh Gear Ratio (:1) 0.84 Eighth Gear Ratio (:1) 0.67
Mileage
EPA Fuel Economy Est - Hwy 24 MPG Cruising Range - City 418.20 mi EPA Fuel Economy Est - City 17 MPG Fuel Economy Est-Combined 20 MPG Cruising Range - Hwy 590.40 mi Estimated Battery Range N/A Engine
Engine Order Code ERC Engine Type Regular Unleaded
V-6
Displacement 3.6 L/220 Fuel System Sequential MPI
SAE Net Horsepower @ RPM 293 @ 6400 SAE Net Torque @ RPM 260 @ 4000 Engine Oil Cooler Regular Duty
Electrical
Cold Cranking Amps @ 0° F (Primary) 650 Cold Cranking Amps @ 0° F (2nd) 650 Cold Cranking Amps @ 0° F (3rd) N/A Maximum Alternator Capacity (amps) 220 Cooling System
Total Cooling System Capacity N/A
63 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 13
Vehicle
Emissions
Tons/yr of CO2 Emissions @ 15K mi/year 8.8 EPA Greenhouse Gas Score 4.0 Chassis
Weight Information
Standard Weight - Front 0.00 lbs Standard Weight - Rear 0.00 lbs Base Curb Weight 4929 lbs Gross Axle Wt Rating - Front N/A Gross Axle Wt Rating - Rear N/A Curb Weight - Front N/A Curb Weight - Rear N/A Option Weight - Front 0.00 lbs
Option Weight - Rear 0.00 lbs Reserve Axle Capacity - Front N/A Reserve Axle Capacity - Rear N/A As Spec'd Curb Weight N/A As Spec'd Payload N/A Maximum Payload Capacity N/A
Gross Combined Wt Rating 11600 lbs Gross Axle Weight Rating N/A Curb Weight N/A Reserve Axle Capacity N/A
Total Option Weight 0.00 lbs Payload Weight Front 0 lbs Payload Weight Rear 0 lbs Gross Vehicle Weight Rating 6500.00 lbs Trailering
Dead Weight Hitch - Max Trailer Wt. 5000 lbs Dead Weight Hitch - Max Tongue Wt. 500 lbs Wt Distributing Hitch - Max Trailer Wt. 6200 lbs Wt Distributing Hitch - Max Tongue Wt. 620 lbs Fifth Wheel Hitch - Max Trailer Wt. N/A Fifth Wheel Hitch - Max Tongue Wt. N/A Maximum Trailering Capacity 6200 lbs
Frame
Frame Type N/A Sect Modulus Rails Only N/A
Frame RBM N/A Frame Strength N/A
Frame Thickness N/A
Suspension
Suspension Type - Front Short And Long
Arm
Suspension Type - Rear Multi-Link
Spring Capacity - Front N/A Spring Capacity - Rear N/A
64 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 14
Chassis
Suspension
Axle Type - Front Independent Axle Type - Rear Independent Axle Capacity - Front N/A Axle Capacity - Rear N/A
Axle Ratio (:1) - Front 3.45 Axle Ratio (:1) - Rear 3.45 Shock Absorber Diameter - Front N/A Shock Absorber Diameter - Rear N/A Stabilizer Bar Diameter - Front N/A Stabilizer Bar Diameter - Rear N/A Tires
Front Tire Order Code TXQ Rear Tire Order Code TXQ
Spare Tire Order Code N/A Front Tire Size P255/60TR18
Rear Tire Size P255/60TR18 Spare Tire Size Compact
Front Tire Capacity N/A Rear Tire Capacity N/A
Spare Tire Capacity N/A Revolutions/Mile @ 45 mph - Front N/A Revolutions/Mile @ 45 mph - Rear N/A Revolutions/Mile @ 45 mph - Spare N/A Wheels
Front Wheel Size 18 X 8 in Rear Wheel Size 18 X 8 in
Spare Wheel Size Compact in Front Wheel Material Steel
Rear Wheel Material Steel Spare Wheel Material Steel
Steering
Steering Type Rack-Pinion Steering Ratio (:1), Overall N/A Steering Ratio (:1), On Center N/A Steering Ratio (:1), At Lock N/A Turning Diameter - Curb to Curb 41 ft Turning Diameter - Wall to Wall N/A Brakes
Brake Type 4-Wheel Disc Brake ABS System 4-Wheel
Brake ABS System (Second Line) 4-Wheel Disc - Front (Yes or ) Yes Disc - Rear (Yes or ) Yes Front Brake Rotor Diam x Thickness 13.8 in Rear Brake Rotor Diam x Thickness 13 in Drum - Rear (Yes or ) N/A Rear Drum Diam x Width N/A
65 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 15
Chassis
Fuel Tank
Fuel Tank Capacity, Approx 24.6 gal Aux Fuel Tank Capacity, Approx N/A Fuel Tank Location N/A Aux Fuel Tank Location N/A
Dimensions
Interior Dimensions
Passenger Capacity 5 Front Head Room 39.9 in
Front Leg Room 40.3 in Front Shoulder Room 58.5 in
Front Hip Room 57 in Second Head Room 39.8 in
Second Leg Room 38.6 in Second Shoulder Room 50.4 in
Second Hip Room 42.8 in
Exterior Dimensions
Wheelbase 119.8 in Length, Overall w/rear bumper N/A
Length, Overall 200.8 in Width, Max w/o mirrors 75.8 in Height, Overall 72.9 in Track Width, Front 63.9 in
Track Width, Rear 64.1 in Overhang, Front N/A
Overhang, Rear w/o bumper N/A Front Bumper to Back of Cab N/A Cab to Axle N/A Cab to End of Frame N/A
Ground to Top of Load Floor N/A Ground to Top of Frame N/A Frame Width, Rear N/A Ground Clearance, Front N/A
Ground Clearance, Rear N/A Min Ground Clearance 8.1 in
Body Length 0.00 ft Rear Door Opening Height N/A
Rear Door Opening Width N/A Liftover Height 32.2 in
Cab to Body N/A
Cargo Area Dimensions
Cargo Area Length @ Floor to Seat 1 N/A Cargo Area Length @ Floor to Seat 2 N/A Cargo Area Length @ Floor to Seat 3 N/A Cargo Box Width @ Top, Rear N/A Cargo Area Width @ Beltline N/A Cargo Box Width @ Floor N/A Cargo Box Width @ Wheelhousings N/A Cargo Box (Area) Height N/A Tailgate Width N/A Cargo Volume N/A
66 Winner Chevrolet / Elk Grove Auto Group
Andrew Villareal | (916)509-8598 | [email protected] [Fleet] 2025 Dodge Durango (WDEE75) Pursuit AWD (23) ( Complete ) This document contains information considered Confidential between GM and its Clients uniquely. The information provided is not intended for public disclosure. Prices, specifications, and availability are subject to change without notice, and do not include certain fees, taxes and charges that may be required by law or vary by manufacturer or region.

Performance figures are guidelines only, and actual performance may vary. Photos may not represent actual vehicles or exact configurations. Content based on report preparer’s input is subject to the accuracy of the input provided.

Data Version: 24638. Data Updated: Feb 4, 2025 6:45:00 PM PST.

Feb 5, 2025 Page 16
Dimensions
Cargo Area Dimensions
Cargo Volume to Seat 1 85.1 ft³ Cargo Volume to Seat 2 43.3 ft³ Cargo Volume to Seat 3 N/A Ext'd Cab Cargo Volume N/A
67 68
EPASD BOARD CONSENT ITEM 10.1

EAST PALO ALTO

SANITARY DISTRICT

STAFF REPORT
DATE: July 29, 2025
TO: Honorable Members of the City of East Palo Alto City Council, Governing Board to the East Palo Sanitary District, a Subsidiary of the City of East Palo Alto VIA: Melvin Gaines, General Manager
BY: Humza Javed, District Engineer
SUBJECT: 2025 Sanitary Sewer Management Plan Update
Recommendation
Adopting a resolution:

1. Adopting the 2025 Sanitary Sewer System Management Plan; and

2. Finding that the proposed action is exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines section 15308 (Protection of the Environment).

Alignment with City Council Strategic Plan
This recommendation is primarily aligned with:

Public Infrastructure and Utilities
Background
On November 15, 2023, the San Mateo Local Agency Formation Commission (LAFCo) unanimously approved the City of East Palo Alto’s application to designate the East Palo Alto Sanitary District (EPASD or “District”) as a subsidiary district of the City. The reorganization took effect on October 1, 2024, when the City Council assumed governance of EPASD.

EPASD remains a legally separate entity from the City, and its assets are kept distinct On December 6, 2022, the State Water Resources Control Board (SWRCB) adopted Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems with greater than one mile of collection lines, and the new order went into effect on June 5, 2023, and is herein referred to as the “General Order”. The purpose of this General Order is to 69 EPASD BOARD CONSENT ITEM 10.1
ensure that public agencies that own or operate sanitary sewer systems develop and implement sewer system management plans and report all sanitary sewer spills to the SWRCB’s online California Integrated Water Quality System (CIWQS) Sanitary Sewer System Database using the City Waste Discharge Identification Number 2SSO10129. The goal of the General Order is to minimize sewer spills, protect the Waters of the State and assure proper management and operation of the sanitary sewers.

The updated General Order also requires each public agency to update the Sanitary Sewer Management Plan (SSMP) every six years and include any significant program changes. The updated SSMP must be approved by the governing board upon completion of the update, certified by the City’s legally responsible official and uploaded to the CIWQS system no later than August 2, 2025. This resolution is for the District Board to approve the updated SSMP, as required under the General Order, by August 2, 2025. Thereafter, under the new General Order, re-certification will be required every 6 years.

Analysis
The SSMP is a living planning document that must address, at a minimum, the required SSMP elements of the General Order. To be effective, the SSMP must include procedures for the management, operation, and maintenance of the sanitary sewer system. The procedure must incorporate the prioritization of system repairs and maintenance to proactively prevent spills and address the implementation of current standard industry practices through available equipment, technologies, and strategies. Effective management of the District’s Wastewater Collection system includes:
- Provide uninterrupted sanitary sewer service.
- Minimize the risk of spills by reducing the impact and probability of spills and adapting the program from results of operations and spill events. - Mitigate spills to minimize water quality and environmental impacts to Waters of the State.
- Ensure adequate sewer system capacity to address the City’s current and future flows addressing climate change and inflow and infiltration impacts, system resilience and growth.
- Sustain aging sewer infrastructure by implementing an asset management program to extend asset lifecycle.
- Ensure adequate funding support and resources to sustain long-term asset management.
- Assure proper training and field exercises for well-prepared staff at all levels of the program that assures full compliance with the General Order.

The SSMP is organized into 11 Elements identified in the General Order. Each section of the SSMP includes information demonstrating the District’s efforts to comply with each of the mandatory and applicable elements required within the General Order. The organization of this SSMP is consistent with the SWRCB guidelines and includes the following 11 mandatory General Order elements:
70 EPASD BOARD CONSENT ITEM 10.1
- Goal and Introduction
- Organization
- Legal Authority
- Operation and Maintenance Program
- Design and Performance Provisions
- Spill Emergency Response Plan
- Sewer Pipe Blockage Control Program
- System Evaluation, Capacity Assurance, and Capital Improvements - Monitoring, Measurement and Program Modifications
- Internal Audits
- Communication Program
The General Order requires each public agency to update the SSMP every six years and include any significant program changes. The updated SSMP must be approved by the governing board upon completion of the update. Through the District’s SSMP audit process, the District can track and evaluate the effectiveness of the SSMP, identify deficiencies in the management, operation and maintenance of the District’s sanitary sewer collection system, and implement changes to the SSMP to address these deficiencies. The SSMP has been included as Attachment No. 2 to the staff report.

District staff has signed off on the SSMP, and an adopted Resolution by the Board will satisfy compliance with the General Order. District staff will subsequently complete the certification process and upload the document to the SWRCB’s electronic database.

Fiscal Impact
There is no direct fiscal impact with adoption of the SSMP.

Public Notice
The public was provided notice of this agenda item by posting the Advisory Committee agenda on the City’s official bulletin board outside City Hall and making the agenda and report available at the City’s website and at the San Mateo Co. Library located at 2415 University Avenue, East Palo Alto.

Environmental
The action being considered by the City Council is exempt from the California Environmental Quality Act (CEQA) because it requires the implementation of management operations programs and plans to enhance and protect the environment by limiting the occurrence of SSOs in the City. (CEQA Guideline section 15308).

Attachments

1. Resolution

2. Sanitary Sewer Management Plan
71 1 of 2
RESOLUTION NO. XX – 2025

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF EAST PALO ALTO
ADOPTING THE 2025 SEWER SYSTEM MANAGEMENT PLAN AS REQUIRED BY THE STATE WATER BOARD’S WASTE DISCHARGE REQUIREMENTS AND AUTHORIZING PROCESSING OF

THE CERTIFICATION
WHEREAS, the State Water Resources Control Board (State Board) adopted Order Number 2006-0003-DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems (WDRs); and
WHEREAS, the State Board reissued WQ 2022-0103-DWQ Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems and was adopted by the State Board on December 6, 2022; and
WHEREAS, these WDRs apply to the District's Sewer Collection System; and, WHEREAS, the objective of the WDRs is to reduce the frequency and volume of Sanitary Sewer Spills (SSSs) by requiring cities and special districts to fund, operate, maintain, and manage their sewer collection system; and
WHEREAS, the WDRs contain provisions that require sewer collection system agencies to develop programs and plans to operate, maintain, and manage the sewer collection system is adequately documented in what the WDRs refer to as a Sewer System Management Plan (SSMP); and
WHEREAS, the WDR requires reporting and certification of SSS events through the California Integrated Water Quality System (CIWQS); and WHEREAS, the District Board adopted and certified the SSMP on July 29, 2025, complying with the WDR; and
WHEREAS, the District has updated the SSMP in accordance with the reissued WDRs; and
WHEREAS, the WDRs require that the District certify to the State Board every six years that the SSMP is in compliance with the WDRs; and
WHEREAS, the SSMP must be approved and adopted by the District Board before August 2, 2025, to be in compliance with the State Board regulations.

NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF EAST PALO ALTO HEREBY:
72 2 of 2

1. Finds the foregoing recitals are true and correct, and are incorporated by this reference into this action;

2. Adopts the 2025 Sewer System Management Plan; and

3. Finds that the proposed action being considered by the City Council is exempt from the California Environmental Quality Act (CEQA) because it requires the implementation of management operations programs and plans to enhance and protect the environment by limiting the occurrence of SSOs in the City. (CEQA Guideline section 15308).

PASSED AND ADOPTED this 29th day of July 2025, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Martha Barragan, Mayor
ATTEST: APPROVED AS TO FORM:

James Colin, City Clerk John D. Lê, City Attorney
73 Sewer System Management Plan
2025 Update
East Palo Alto Sanitary District
(A Subsidiary District of the City of East Palo Alto)
Waste Discharge ID (WDID): # 2SSO10129
REVIEWED AND APPROVED BY:

Humza Javed, P.E.

Public Works Director/Dist. Engineer
Legally Responsible Official
East Palo Alto Sanitary District
Sanitary Sewer Collec6on System
(includes Element Development Plans & Schedules)
Date Signed
July 15, 2025
74 THIS PAGE INTENTIONALLY LEFT BLANK
75 SSMP CHANGE LOG
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Agency use only. COPY THIS PAGE AS NEEDED Revision
Date
SSMP
Secon
Approval
Date
Descripon of Change/Revision Made Inials

76 SSMP CHANGE LOG
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Agency use only. COPY THIS PAGE AS NEEDED Revision
Date
SSMP
Secon
Approval
Date
Descripon of Change/Revision Made Inials

77 LETTER OF COMPLIANCE
© 2025 Fischer Compliance, LLC. All rights reserved. SSMP licensed for Agency use only. Page i East Palo Alto Sanitary District
A?n: Humza Javed
Public Works Director Legally Responsible Official (LRO) 1960 Tate Street
East Palo Alto, CA 94303
Dear Mr Javed
We are pleased to present the new 2025 Sewer System Management Plan (SSMP) Update developed in partnership with District management. The 2025 Update meets and exceeds compliance with the Reissued WDR (State Water Board, Water Quality Order No. 2022-0103-DWQ, A?achment D-10 and Specifica6ons

5.4). The 2025 SSMP has been completely revised to harmonize with industry standard guidelines and incorporates the latest SSMP Audit findings.

The 2025 SSMP is a declara6on of what the District is doing to demonstrate full compliance with the Reissued WDR. A?achment A of the Reissued WDR (page A-4), states “A sewer system management plan is a living document an Enrollee develops and implements to effec6vely manage its sanitary sewer system(s) in accordance with this General Order.” This requires the District to periodically review and update the SSMP as necessary un6l its next required 6-year SSMP Update is completed.

To support these ongoing review and update requirements, this document includes a sample change log that may be used as a reference if a system is not already in place. We encourage you to share this example with all relevant team members responsible for implemen6ng or documen6ng SSMP revisions, to help ensure consistency, transparency, and con6nued compliance.

We look forward to assis6ng the District wherever necessary to fully implement the new 2025 SSMP Update.

Sincerely,
James Fischer, P.E.

Principal, Fischer Compliance LLC
Creden6aled U.S. EPA NPDES Compliance Inspector
78 TABLE OF CONTENTS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Agency use only. Page ii

TABLE OF CONTENTS
INTRODUCTION ................................................................................................................................................ 1 SSMP Organiza6on ..................................................................................................................................................................... 3 Abbrevia6ons and Acronyms ...................................................................................................................................................... 4

1. GOAL AND INTRODUCTION ....................................................................................................................... 5

1.1. Regulatory Context ............................................................................................................................................................ 5

1.2. SSMP Update Schedule ...................................................................................................................................................... 6

1.3. Sewer System Asset Overview ........................................................................................................................................... 8 Specifica6ons 5.2 – SSMP Development and Implementa6on ................................................................................................. 11 Specifica6ons 5.7 – Alloca6on of Resources ............................................................................................................................. 12 Provisions 6.1 - Enforcement Provisions ................................................................................................................................... 13 Provisions 6.3 Sewer System Management Plan Availability .................................................................................................... 14

2. ORGANIZATION ....................................................................................................................................... 15

2.1. Organiza6onal Chart ........................................................................................................................................................ 18

2.2. Organiza6onal Staffing Responsibili6es ........................................................................................................................... 19

2.3. Chain of Communica6on for Repor6ng Spills .................................................................................................................. 20

3. LEGAL AUTHORITY .................................................................................................................................. 22

4. OPERATION AND MAINTENANCE PROGRAM ............................................................................................ 24

4.1. Updated Map of Sewer System ....................................................................................................................................... 24

4.2. Preven6ve Opera6on and Maintenance Ac6vi6es .......................................................................................................... 26

4.3. Training ............................................................................................................................................................................ 28

4.4. Equipment Inventory ....................................................................................................................................................... 30 Specifica6ons 5.19 - Opera6ons and Maintenance .................................................................................................................. 32

5. DESIGN AND PERFORMANCE PROVISIONS ............................................................................................... 35

5.1. Updated Design Criteria/Construc6on Standards/Specifica6ons .................................................................................... 35

5.2. Procedures and Standards ............................................................................................................................................... 36

6. SPILL EMERGENCY RESPONSE PLAN ......................................................................................................... 37

7. SEWER PIPE BLOCKAGE PROGRAM .......................................................................................................... 39

8. SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS .................................................. 43

8.1. System Evalua6on and Condi6on Assessment ................................................................................................................ 43

8.2. Capacity Assessment and Design Criteria ........................................................................................................................ 45

8.3. Priori6za6on of Correc6ve Ac6on ................................................................................................................................... 48

8.4. Capital Improvement Plan ............................................................................................................................................... 49

9. MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS ............................................................ 51

10. INTERNAL AUDITS ................................................................................................................................... 53

11. COMMUNICATION PROGRAM ................................................................................................................. 55 LIST OF APPENDICIES ...................................................................................................................................... 57 79 TABLE OF CONTENTS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for Agency use only. Page iii

LIST OF FIGURES
Figure 1 - Collec6on System Opera6onal Report – SWRCB CIWQS, DATES RANGE HERE ............................................ 2 Figure 2 - Sewer System Management Plan, Subsequent Update and Audit Due Dates ............................................. 6 Figure 3 - District Vicinity Map and Service Area .......................................................................................................... 9 Figure 4 - Organiza6on Chart ...................................................................................................................................... 18 Figure 5 - Organiza6onal Staffing Responsibili6es ...................................................................................................... 19 Figure 6 - Chain of Communica6on for Repor6ng Spills ............................................................................................. 20

LIST OF TABLES
Table 1 - Abbrevia6ons and Acronyms .......................................................................................................................... 4 Table 2 – District Sewer Connec6on Flow Classifica6ons and Connec6ons Data ......................................................... 9 Table 3 - Implementa6on Responsibili6es .................................................................................................................. 16 Table 4 - Responsible Posi6on Contact Informa6on ................................................................................................... 17 80 OVERVIEW
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 1 of 57 ends

Introduc6on
This Sewer System Management Plan (SSMP) or “Plan” has been prepared for the East Palo Alto Sanitary District (District) with technical assistance from Fischer Compliance LLC for mee6ng and exceeding compliance with the State Water Resources Control Board’s 2022 General Waste Discharge Requirements, Order WQ 2022-0103-DWQ for Sanitary Sewer Systems (referred to throughout this document as the WDR). The District provided all details, informa6on and ins6tu6onal insights for prepara6on of the SSMP. The document has been developed to meet the size, scale, and complexity, serving as a “living document” used as a tool for managing and opera6ng the District's sanitary sewer collec6on system. Addi6onally, the latest 2024 Sewer System Management Plan Guidance Manual published by the Bay Area Clean Water Agency (BACWA) was u6lized as a model for development of the document to harmonize formaQng/content and incorporate recommended suggested guidance wherever possible.

The District’s commitment to mee6ng or exceeding regulatory requirements, along with their proac6ve approach to opera6on and management of the collec6on system, has served them well, as evidenced by system performance rela6ve to other agencies in the region and the state.

Figure 1 provides key Agency spill metrics, including data comparing the District’s spill record with state and regional system data. The District consistently performs be?er than the statewide and regional spill rate indices and net spill volumes for all categories of spills from its sanitary sewer collec6on system.

This SSMP reflects the ongoing day-to-day ac6vi6es of the District for the management, opera6on, maintenance, and funding of the District’s sanitary collec6on system. As such, this SSMP is a living document subject to constant review and revision as condi6ons and needs of the collec6on system change. This SSMP relies on numerous suppor6ng documents, which are also subject to change, and which form the basis for how the District performs opera6on and maintenance of the collec6on system. The most current version of the SSMP, although it may be subject to update at any 6me, will be found at the District’s Administra6ve Office. 81 OVERVIEW
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 2 of 57 ends

Figure 1 - Collecon System Operaonal Report – SWRCB CIWQS, 7-1-2019 to 7/1/2025 82 OVERVIEW
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 3 of 57 ends

SSMP Organiza6on
This SSMP is organized into 11 core elements following A?achment D of the WDR, with inclusion of applicable Specifica6ons requirements.

Each individual element in the SSMP includes the following technical contents.

T. Requirements – Provides the actual descrip6on of applicable requirements in the WDR.

U. Compliance – Describes the District’s approach to complying with the WDR requirements.

V. Effec6veness – As measured by Key Performance Indicators (KPIs.) W. Implementa6on – Demonstrates how the District will ensure the SSMP will be carried out as described.

X. Resilience – Demonstrates the resilience that is addressed in the SSMP and built-in to the District’s collec6on system and procedures.

Y. Appendix Inclusions – List the items included in the Appendix for each SSMP Element, if any.

83 OVERVIEW
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 4 of 57 ends

Abbrevia6ons and Acronyms1
BMP Best Management Prac6ces
CCTV Closed Circuit Television
CIP Capital Improvement Program
CIPP Cured in Place Pipe
CIWQS California Integrated Water Quality System (State Water Board Online Spill Database) CMMS Computerized Maintenance Management System
EPA US Environmental Protec6on Agency
EPASD East Palo Alto Sanitary District
FOG Fats, Oils and Grease
FSE Food Service Establishment
GCD Grease Control Device
GIS Geographic Informa6on System
I & I Inflow and Infiltra6on
LRO Legally Responsible Official
NPDES Na6onal Pollutant Discharge Elimina6on System
RWQCB Regional Water Quality Control Board
SCADA Supervisory Control and Data Acquisi6on
SERP Spill Emergency Response Plan
SOP Standard Opera6ng Procedure
SSMP Sewer System Management Plan
Spill Sanitary Sewer Spill
WBSD West Bay Sanitary District
WDR Sanitary Sewer Systems General Wastewater Discharge Requirements Order issued by the State Water Board (Order No. 2022-0103-DWQ)
SWRCB State Water Resources Control Board
WDID Waste Discharge ID Number (CIWQS)
1 For a list of related WDR terms, see the WDR, Attachment A (page 32) Table 1 - Abbreviaons and Acronyms
84 GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 5 of 57 ends

1. Goal and Introduc6on

WDR REQUIREMENTS
A?. D-1 (pg. D-2)
“The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to: (1) properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s), (2) reduce and prevent spills, and (3) contain and migate spills that do occur.

The Plan must include a narrave Introducon secon that discusses the following items:”

1.1. Regulatory Context

WDR REQUIREMENTS
A?. D-1.1 (pg. D-2)
“The Plan Introducon secon must provide a general descripon of the local sewer system management program and discuss Plan implementaon and updates”.

COMPLIANCE
The District is commi?ed to fully implemen6ng the WDR2 which includes addressing all requirements by integra6ng a wide range of programs specifically designed for ensuring the integrity and efficiency of the District’s sanitary sewer collec6on system. Moreover, the District is dedicated to maintaining its collec6on system by implemen6ng various work programs, with a focus on cri6cal areas, to prevent spills, allowing for a comprehensive approach to maintenance. Work programs include CCTV inspec6ons, pipe cleaning, manhole inspec6ons, root control, source control and pipe repair, just to name a few. Work programs are described in more detail in Sec6on 4.2 “Specifica6ons 5.19- Opera6on and Maintenance” of this SSMP.

The District does not employ field staff. The District contracts with the West Bay Sanitary District (WBSD) for opera6on and maintenance of the collec6on system. WBSD operates the East Palo Alto Sanitary District system in the same manner it operates its own.

By priori6zing proac6ve measures and taking a comprehensive approach, the District is well-equipped with a proven track record of effec6vely opera6ng its sanitary sewer collec6on system with the highest levels of service, complying with the WDR, and reducing/elimina6ng sewage spills.

EFFECTIVENESS
N/A

IMPLEMENTATION PLAN/SCHEDULE
N/A
2 State Water Resources Control Board, Statewide Waster Discharge requirements, General Order for Sanitary Sewer Systems 85 GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 6 of 57 ends

1.2. SSMP Update Schedule

WDR REQUIREMENTS
A?. D-1.2 (pg. D-3)
“The Plan Introducon secon must include a schedule for the Enrollee to update the Plan, including the schedule for conducng internal audits. The schedule must include milestones for incorporaon of acvies addressing prevenon of sewer spills.”

COMPLIANCE
The District u6lizes the State Water Board’s online lookup tool to ensure compliance with all required due dates for upda6ng its SSMP and comple6ng its required SSMP Audits (see chart below).

The District’s most recent SSMP audit was completed for the period August 2021 through August 2024.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Are SSMP Audits and SSMP Updates being performed as scheduled? • Has the SSMP been approved by the governing board on the required schedule (i.e., every six years)? • Are specific internally established sewer program milestones being monitored? Figure 2 - Sewer System Management Plan, Subsequent Update and Audit Due Date Agency to Update this table a<er each due dates 86 GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 7 of 57 ends

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

1.2.1 Prepare for next SSMP Audit Begin 8/2/2027
X

1.2.2 Complete and Upload next SSMP Audit By 2/2/2028
X

1.2.3 Incorporate Audit Findings, update Change
Log and Update SSMP
Begin a\er comple6on
of SSMP Audit
X

1.2.4 Prepare for next SSMP Audit Begin 8/2/2030
X

1.2.5 Complete and Upload next SSMP Audit By 2/2/2031
X

1.2.6 Incorporate Audit Findings, update Change
Log and Update SSMP
Begin a\er comple6on
of SSMP Audit
X

1.2.7 Prepare for next SSMP Update Begin 2/2/2031
X

1.2.8 Board Approval deadline for SSMP Update* By 8/2/2031 X
87 GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 8 of 57 ends

1.3. Sewer System Asset Overview

WDR REQUIREMENTS
A?. D-1.3 (pg. D-3)
“The Plan Introducon secon must provide a descripon of the Enrollee-owned assets and service area, including but not limited to:
• Locaon, including county(ies);
• Service area boundary;
• Populaon and community served;
• System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump staons and siphons;
• Structures diverng stormwater to the sewer system;
• Data management systems;
• Sewer system ownership and operaon responsibilies between Enrollee and private enes for upper and lower sewer laterals;
• Esmated number or percentage of residenal, commercial, and industrial service connecons; and
• Unique service boundary condions and challenge(s).
• Addionally, the Plan Introducon secon must provide reference to the Enrollee’s up-to-date map of its sanitary sewer system, as required in secon 4.1 (Updated Map of Sanitary Sewer System) of this AAachment.”

COMPLIANCE
The District is located in San Mateo county and provides wastewater collec6on services to the City of East Palo Alto and por6ons of Menlo Park. (See Figure 3 below), with an approximate (total) popula6on of approximately 26,835. The District collec6on system consists of approximately 35 miles of gravity mains.

The District’s system does not have pump sta6ons, force mains or stormwater diversion structures. For addi6onal details about the District’s collec6on system, see the most current Annual Report in the CIWQS database.
88 GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 9 of 57 ends

The District uses the Lucity (CMMS) for work orders and asset management, Arc-GIS for mapping and GraniteNet for CCTV data capture. (Work orders and scheduling are discussed further in Element 4.2) East Palo Alto Sanitary District does not own or operate any por6on of the service lateral, as laterals are privately owned.

Es6mated customer connec6on flow classifica6ons and connec6on data are presented in table 2, below, for residen6al, commercial industrial, and ins6tu6onal data.

Use Type Number of Connecons
Residen6al 6639
Commercial 148
Industrial 20
Figure 3 - District Vicinity Map and Service Area
Table 2 – District Sewer Connecon Flow Classificaons and Connecons Data 89 GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 10 of 57 ends

Overall, the District is in a good posi6on to maintain its collec6on system and does not have opera6on and maintenance challenges due the service area condi6ons.

The District maintains up to date system maps. See Element 4.1 - Updated Map of Sanitary Sewer System for more detail.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Are asset sta6s6cs periodically reviewed and updated as necessary? • Are omissions or errors addressed in a 6mely manner?
• Are system maps up to date?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

1.3.1 Review District-owned asset
sta6s6cs and element
descrip6on; update as
necessary
At the beginning of the audit cycle and
when significant changes have been made. X

RESILIENCE
Resilience is addressed in Element 1 by:
• Adhering to an SOP for collec6ng and managing asset data. • Redundancy: More than one member of staff is trained and able to retrieve and manage the data. • Implemen6ng a QA/QC process to help ensure informa6on is accurate. • Using Calendar Reminders to ensure compliance deadlines are met.

APPENDIX 1 INCLUSIONS:
• None
90 GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 11 of 57 ends

Specifica6ons 5.2 – SSMP Development and Implementa6on

WDR REQUIREMENTS
Specifica6on. 5.2 (pg. 18)
“To facilitate adequate local funding and management of its sanitary sewer system(s), the Enrollee shall develop and implement an updated Sewer System Management Plan. The scale and complexity of the Sewer System Management Plan, and specific elements of the Plan, must match the size, scale, and complexity of the Enrollee’s sanitary sewer system(s). The Sewer System Management Plan must address, at minimum, the required Plan elements in AAachment D (Sewer System Management Plan – Required Elements) of this General Order. To be effecve, the Sewer System Management Plan must include procedures for the management, operaon, and maintenance of the sanitary sewer system(s). The procedures must: (1) incorporate the priorizaon of system repairs and maintenance to proacvely prevent spills, and (2) address the implementaon of current standard industry pracces through available equipment, technologies, and strategies.”

COMPLIANCE
This SSMP has been completed updated to meet the requirements of Order WQ 2022-0103-DWQ and address all required Elements and Specifica6ons required by the Order. The SSMP addresses management, opera6ons and maintenance procedures specific to the District’s collec6on system. The District maintains a proac6ve O&M program to operate its system and iden6fy defects, which are then priori6zed for repair, replacement, rehabilita6on, or placed on modified maintenance schedules. (See Elements 4 and 8 and Specifica6ons 5.19 of this SSMP for more detail).

The District and the staff of WBSD keep up with current industry standards, technology and best prac6ces by reviewing industry periodicals, networking and a?ending industry conferences and workshops. The District and WBSD also con6nuously evaluates emerging prac6ces, equipment and technologies for possible implementa6on to enhance opera6ons.
91 GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 12 of 57 ends

Specifica6ons 5.7 – Alloca6on of Resources

WDR REQUIREMENTS
Specificaon. 5.7 (pg. 22)
“The Enrollee shall comply with the following requirements:
• Establish and maintain a means to manage all necessary revenues and expenditures related to the sanitary sewer system; and
• Allocate the necessary resources to its sewer system management program for:
o Compliance with this General Order,
o Full implementaon of its updated Sewer System Management Plan, o System operaon, maintenance, and repair, and
o Spill responses.”

COMPLIANCE
The District maintains various revenue sources to maintain financial stability, meet its opera6onal needs and manage all necessary expenditures to operate its sewer system. Sources of revenue include:
• Sewer Service Charge
 Expended on Collec6on System Opera6ons
• Nonopera6ng Revenue
 Property Taxes
 Expended on Collec6on System Opera6ons and Capital Improvements  Connec6on Fees
 Expended on Capital Improvements
The District’s equipment inventory and staffing levels (Provided by WBSD under contract) are adequate to effec6vely implement this SSMP, properly manage the collec6on system, and respond to emergencies. 92 GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 13 of 57 ends

Provisions 6.1 - Enforcement Provisions

WDR REQUIREMENTS
Provisions 6.1 (pg. 27)
“The following enforcement provisions are based on exisng federal and state regulaons, laws and policies, including the federal Clean Water Act, the state Water Code and the State Water Board Enforcement Policy.”

COMPLIANCE
The Agency is aware of the consequences for noncompliance including associated penal6es for viola6ons.

The Agency maintains a proac6ve stance with full implementa6on of its SSMP.

Noncompliance with requirements of this General Order or discharging sewage without enrolling in this General Order cons6tutes a viola6on of the Water Code and a poten6al viola6on of the Clean Water Act and is grounds for an enforcement ac6on by the State Water Board or the applicable Regional Water Board.

Failure to comply with the no6fica6on, monitoring, inspec6on, entry, repor6ng, and recordkeeping requirements may subject the Agency to administra6ve civil liabili6es of up to $10,000 a day per viola6on pursuant to Water Code sec6on 13385; up to $1,000 a day per viola6on pursuant to Water Code sec6on 13268; or referral to the A?orney General for judicial civil enforcement. Discharging waste not in compliance with the requirements of this General Order or the Clean Water Act may subject the District to administra6ve civil liabili6es up to $10,000 a day per viola6on and addi6onal liability up to $10 per gallon of discharge not cleaned up a\er the first 1,000 gallons of discharge; up to $5,000 a day per viola6on pursuant to Water Code sec6on 13350 or up to $20 per gallon of waste discharged; or referral to the A?orney General for judicial civil enforcement.
93 GOAL AND INTRODUCTION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 14 of 57 ends

Provisions 6.3 Sewer System Management Plan Availability

WDR REQUIREMENTS
Provisions 6.3 (pg. 31)
“The Enrollee’s updated Sewer System Management Plan must be maintained for public inspecon at the Enrollee’s offices and facilies and must be available to the public through CIWQS and/or on the Enrollee’s website, in accordance with secon 3.8 (Sewer System Management Plan Reporng Requirements) of AAachment E1 (Noficaon, Monitoring, Reporng and Recordkeeping Requirements) of this General Order.”

COMPLIANCE
The District has uploaded this SSMP to the CIWQS database and published it on its website. In addi6on, the SSMP is available for public review at District offices, by appointment, during regular business hours. 94 ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 15 of 57 ends

2. Organiza6on

WDR REQUIREMENTS
A?. D-2 (pg. D-3)
“The Plan must idenfy organizaonal staffing responsible and integral for implemenng the local Sewer System Management Plan through an organizaon chart or similar narrave documentaon that includes:
• The name of the Legally Responsible Official as required in sec6on 5.1 (Designa6on of a Legally Responsible Official) of this General Order;
• The posi6on 6tles, telephone numbers, and email addresses for management, administra6ve, and maintenance posi6ons responsible for implemen6ng specific Sewer System Management Plan Element;.
• Organiza6onal lines of authority; and
• Chain of communica6on for repor6ng spills from receipt of complaint or other informa6on, including the person responsible for repor6ng spills to the State and Regional Water Boards and other agencies, as applicable. (For example, county health officer, county environmental health agency, and State Office of emergency Services.)

COMPLIANCE
The above items are addressed below:

District’s Legally Responsible Officials (LRO) are listed below:
• Humza Javed, Public Works Director
Mr. Javed meets the requirements set forth in Specifica6ons 5.1 of the WDR.

95 ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 16 of 57 ends

IMPLEMENTATION RESPONSIBILITIES
Sewer System Management Plan Elements Responsible Posion

1. SSMP Plan, Goal and Introduc6on Ulity Manager

1.1. Regulatory Context Ulity Manager

1.2. SSMP Update Schedule Ulity Manager

1.3. Sewer System Asset Overview Ulity Manager

2. Organiza6on Ulity Manager

3. Legal Authority Ulity Manager

4. Opera6ons and Maintenance Program Ulity Manager

4.1. Updated maps of Sanitary Sewer System Ulity Manager

4.2. Preven6ve Opera6on & Maintenance Ulity Manager

4.3. Training Ulity Manager

4.4. Equipment Inventory Ulity Manager

5. Design/Performance Ulity Manager

5.1. Updated Design Criteria & Construc6on
Standards Ulity Manager

5.2. Procedures and Standards Ulity Manager

6. Spill Emergency Response Plan Ulity Manager

7. Sewer Pipe Blockage Program Ulity Manager

8. System Eval, Capacity Assurance, Capital Imp. Ulity Manager

8.1. System Evalua6on and Condi6on Assessment Ulity Manager

8.2. Capacity Assessment and Design Criteria Ulity Manager

8.3. Priori6za6on of Correc6ve Ac6on Ulity Manager

8.4. Capital Improvement Plan Ulity Manager

9. Monitoring, Measurement & Program Modifica6ons Ulity Manager

10. Internal Audits Ulity Manager

11. Communica6on Program Ulity Manager
Table 3 - Implementaon Responsibilies
96 ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 17 of 57 ends

RESPONSIBLE POSITION CONTACT INFORMATION
Name Title Phone Email
Ma?hew Vining U6lity Manager (UM) (650) 853-3117 [email protected] Humza Javed Public Works Director
(PWD) (650) 858-3130 [email protected]

Table 4 - Responsible Posion Contact Informaon
97 ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 18 of 57 ends

2.1. Organiza6onal Chart
Figure 4 - Organizaon Chart
/Dist. Engineer
98 ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 19 of 57 ends

2.2. Organiza6onal Staffing Responsibili6es
Board of Directors
The EPASD is governed by a five-member Board of Directors, each elected to a four-year term. The EPASD is an independent and autonomous poli6cal en6ty that has no legal affilia6on with any municipali6es located within its service area boundaries. The Board meets monthly and special mee6ngs are held as needed.

Public Works Director
The Public Works Director establishes policy, plans strategy, leads staff, allocates resources, delegates responsibility, authorizes outside contractors to perform services, and may serve as a public informa6on officer.

Ulity Manager
Designated as a Data Submi?er. Manages and administers the capital improvement program (CIP). Inspects CIP projects and ensures that new and rehabilitated assets meet EPASD standards. Manages field opera6ons and maintenance ac6vi6es, provides relevant informa6on to EPASD management, prepares and implements con6ngency plans, leads emergency response, and trains field crews.

Field Crews
Responds to emergencies. Performs preven6ve maintenance ac6vi6es, mobilizes, and responds to no6fica6on of stoppages and spills.
*ECO Industrial Waste Invesgator
Conducts inspec6ons, response, permiQng and compliance for industrial and commercial facili6es including restaurants.
*ECO Industrial Waste Inspector. Storm Water
Conducts inspec6ons, response and compliance for storm water issues including spills and prohibited facility discharges.
*ECO Industrial Waste Inspector, Sampling
Collects samples and inspects discharge loca6ons including creeks and grease removal devices. *ECO Engineering Tech III
Inspecon for commercial facilies including restaurants.

Manager Communicaons (Ulies)
Disseminates urgent and per6nent informa6on to the public in a 6mely manner. The responsibility of the General Manager unless specifically delegated to others. * By Palo Alto Regional Water Quality Control Plant Personnel Figure 5 - Organizaonal Staffing Responsibilies
99 ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 20 of 57 ends

2.3. Chain of Communica6on for Repor6ng Spills

Service Calls received by the District are forwarded to West Bay Sanitary District for response, as follows
Service Calls during business hours are received by Administra6ve staff. A Service Request is created in the Lucity CMMS and then the informa6on is forwarded to field crews for response.

Service Calls a\er business hours are received by an answering service and the informa6on is forwarded to on-call personnel.

Remote alarms are sent directly to designated (WBSD) staff Agency Receives Call for Service
WBSD response staff respond to all calls, assess the spill event, and take appropriate ac6ons to mi6gate the spill. All spill events are mi6gated in accordance with the WBSD Spill Emergency Response Plan (SERP) and are documented in adherence to the WDR No6fica6on, Monitoring, Repor6ng and Recordkeeping requirements.

When deemed necessary, calls to Cal-OES are made by the Water Quality Manager, Opera6ons Superintendent, or their designee.

Spill responses will be in accordance with the WBSD SERP, which is in alignment with the EPASD SERP.

Agency’s Response to Spill Event
The responding field staff submit a dra\ event summary. The Water Quality Manager, Opera6ons Superintendent, and Collec6ons staff consult, and review collected data and finalize the report. The report and suppor6ng informa6on is forwarded to the EPASD LRO for submission and cer6fica6on in the CIWQS database, all within the required 6melines.

Agency Reports Spill Event
Figure 6 - Chain of Communicaon for Reporng Spills
100

ORGANIZATION
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 21 of 57 ends

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Have there been any changes requiring updates to the Organiza6onal Chart? • Have there been instances when a service call for a spill was not properly routed to response personnel?
• Were all spill response ac6vi6es documented and forwarded to the LRO? • Have there been any changes in assigned responsibili6es for implemen6ng the SSMP? • Is there a process in place to ensure all contact informa6on remains up to date?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

2.1 Review names, contact informa6on and posi6on
responsibili6es. Update as necessary.

Semi-Annually X X

2.2 Review Chain of Communica6on outcomes for all
spill responses
Each Spill Event X X

2.3 Review Organiza6onal Chart for any changes. Update
as necessary.

Semi-Annually X X

RESILIENCE
Resilience is addressed in Element 2 by:
• Ensuring that more than one person is capable and responsible for specific du6es for SSMP implementa6on, e.g., back-up personnel.
• Designa6on of more than one LRO to help ensure full and con6nuous coverage of du6es. • Tes6ng the phone no6fica6on system to ensure calls are received and routed to appropriate personnel.

APPENDIX 2 INCLUSIONS:
• None
101

LEGAL AUTHORITY
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 22 of 57 ends

3. Legal Authority

WDR REQUIREMENTS
A?. D-3 (pg. D-4)
“The Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority to:
• Prevent illicit discharges into its sanitary sewer system from inflow and infiltra6on (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages;
• Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent uninten6onal cross connec6ons of sanitary sewer infrastructure to storm sewer infrastructure;
• Require that sewer system components and connec6ons be properly designed and constructed; • Ensure access for maintenance, inspec6on, and/or repairs for por6ons of the service lateral owned and/or operated by the Enrollee;
• Enforce any viola6on of its sewer ordinances, service agreements, or other legally binding procedures; and
• Obtain easement accessibility agreements for loca6ons requiring sewer system opera6ons and maintenance, as applicable.

COMPLIANCE
The above items are addressed in order below.

Authority to Prevent Illicit Discharges into District’s Wastewater Collec6on System. • EPASD Sewer Use Ordinance 39 and City of Palo Alto Sewer Use Ordinance 16.09 The District's pre-planned collabora6on and coordina6on with storm drain agencies. • The City of East Palo Alto owns and operates the storm drain system within the service area. As such, the District has de facto authority to access the storm drain system as needed to retrieve spilled sewage and clean the drainage conveyance system.

Require that sewer system components and connec6ons be properly designed and constructed. • EPASD Sewer Use Ordinance 39 and City of Palo Alto Sewer Use Ordinance 16.09 Ensure access for maintenance, inspec6on, and/or repairs for por6ons of the service lateral owned and/or operated by the Enrollee.
• EPASD Sewer Use Ordinance 39 and City of Palo Alto Sewer Use Ordinance 16.09 Enforce any viola6on of its sewer ordinances, service agreements, or other legally binding procedures. • EPASD Sewer Use Ordinance 39 and City of Palo Alto Sewer Use Ordinance 16.09 102

LEGAL AUTHORITY
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 23 of 57 ends

Obtain easement accessibility agreements for loca6ons requiring sewer system opera6ons and maintenance, as applicable.
• East Palo Alto Sanitary District’s Standard Specifica6ons for Construc6on of Sanitary Sewer Collec6on and Conveyance Facili6es, Sec6on C1.03, Exis6ng U6li6es, “The right is reserved by the State, the County, the City or District, and by owners of public u6li6es, to enter upon any street or road right-of-way, or easement for the purpose of maintaining their property and for making necessary repairs or changes caused by the work.” By defini6on (Sec6on A2.01) Public Sewer shall mean a sewer lying within a street or easement, and which is controlled by or under the jurisdic6on of the District.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Are the District ordinances and standards adequate for fulfilling the SSMP Plan legal requirements? • Does the District have a process in place for periodic review and evalua6on of ordinances? • Have there been instances when the code or ordinance did not address a need or circumstance?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

3.1 Review Ordinance(s) to confirm all documents
provide necessary required legal authority.

Once per 6-year SSMP
Update Cycle X X

3.2 Confer with storm drain owners to ensure current
prac6ces and contact informa6on are up to date.

Annually X

3.3 Monitor and document occasions when Ordinance(s)
failed to address issues as intended.

Con6nuously X

RESILIENCE
Resilience is addressed in Element 3 by:
• Keeping abreast of industry trends and local ordinances that may affect opera6ons.

APPENDIX 3 INCLUSIONS:
• None
103

OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 24 of 57 ends

4. Opera6on and Maintenance Program

WDR REQUIREMENTS
A?. D-4 (pg. D-4)
“The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.”

4.1. Updated Map of Sewer System

WDR REQUIREMENTS
A?. D-4.1 (pg. D-4)
“An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilies, pressure pipes and valves, and applicable stormwater conveyance facilies within the sewer system service area boundaries.”

COMPLIANCE
The District maintains current system maps that include gravity mains, force mains, manholes, pump sta6ons, property boundaries, creek loca6ons, and storm drain mapping, and pipe asset informa6on (ID number, diameter, and flow direc6on).

West Bay Sanitary District (WBSD) manages the sewer system maps. WBSD u6lizes its Map Change Forms to facilitate map updates when errors or omissions are discovered in the field. Staff provides details of the map change and then submit the form to supervisory or managerial staff for verifica6on and then it is forwarded to the WBSD engineering technician, who makes the correc6on(s).

Asset details of newly constructed and approved facili6es are forwarded by engineering to the engineering technician for inclusion in the District’s system maps.

The District’s system maps are made available to the State and Regional Water Boards staff upon request.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Were all map updates completed in a 6mely manner?
• Are all staff trained in the procedure for providing map update informa6on? • Are newly installed sewer assets incorporated into the system maps? • Are there terrain features or assets that should be incorporated in future map updates (e.g. exposed pipe, siphons, ARVs, surface water, etc.)

104

OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 25 of 57 ends

IMPLEMENTATION PLAN/SCHEDULE
No Plan Schedule Responsible Party
PWD UM

4.1.1 Review map update procedures with all affected staff. Annually X X

4.1.2 Review/ensure all newly installed facili6es have been updated and included in the system maps Annually X X
105

OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 26 of 57 ends

4.2. Preven6ve Opera6on and Maintenance Ac6vi6es

WDR REQUIREMENTS
A?. D-4.2 (pgs. D-4/D-5)
”A scheduling system and a data collecon system for prevenve operaon and maintenance acvies conducted by staff and contractors. The scheduling system must include:
• Inspec6on and maintenance ac6vi6es;
• Higher-frequency inspec6ons and maintenance of known problem areas, including areas with tree root problems;
• Regular visual and closed-circuit television (CCTV) inspec6ons of manholes and sewer pipes.

The data collecon system must document data from system inspecon and maintenance acvies, including system areas/components prone to root-intrusion potenally resulng in system backup and/or failure.”

COMPLIANCE
The purpose of a work order system is to program and track all required inspec6on and maintenance ac6vi6es within the collec6on system to help proac6vely prevent blockages/opera6onal problems or spills.

The District u6lizes the Lucity Computerized Maintenance Management System (CMMS), which allows the District to make informed decisions regarding its assets and infrastructure by using the collected data from field work orders and documented inspec6ons. Note: The West Bay Sanitary District performs all maintenance and inspec6on ac6vi6es and manages system assets and work orders on behalf of the District.

The WBSD employs a quality assurance procedure that u6lizes a color-coded mapping system to track maintenance ac6vi6es that have been completed and ac6vi6es that were scheduled to be completed, to help ensure all work was completed as scheduled.

The CMMS maintains historical data for all maintenance ac6vi6es and provides a basis for cri6cal analysis and data-driven planning and decision-making today and into the future. This allows for priori6zing and planning rou6ne ac6vi6es such as CCTV inspec6ons, pipe cleaning and pump sta6on maintenance ac6vi6es.

In addi6on, the CMMS is used to plan and schedule higher-frequency inspec6on and maintenance ac6vi6es such as Hot Spot cleaning and root control ac6vi6es. Emergency and other reac6ve ac6vi6es are documented in work orders as well.

The scheduling system allows staff to put certain ac6vi6es on a preven6ve schedule where staff create work orders on a prescribed interval. Work orders for other ac6vi6es are generated by supervisory personnel on an as-needed basis.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Are the District’s maintenance, opera6ons, engineering work orders periodically audited for accuracy and completeness?
• Does the District monitor “open,” “overdue,” or “not yet completed” work orders to ensure comple6on of tasks?
106

OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 27 of 57 ends

• Are inspec6on and maintenance ac6vi6es reducing the number and volume of spills? • Is maintenance work being completed as scheduled?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

4.2.1 Monitor “Past Due” work orders to ensure cri6cal work is being completed Quarterly X X

4.2.2 Review scheduled PMs to ensure the prescribed
schedule remains appropriate. Annually X X
107

OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 28 of 57 ends

4.3. Training

WDR REQUIREMENTS
AA. D-4.3 (pg. D-5)
“In-house and external training provided on a regular basis for sanitary sewer system operaons and maintenance staff and contractors. The training must cover:
• The requirements of this General Order;
• The Enrollee’s Spill Emergency Response Plan procedures and pracce drills; • Skilled esmaon of spill volume for field operators; and • Electronic CIWQS reporng procedures for staff submiKng data.”

COMPLIANCE
The West Bay Sanitary District (WBSD) training program covers several areas involving or associated with wastewater collec6on systems and serves to develop and maintain highly qualified, knowledgeable, and capable staff. This training is provided through a variety of modes (self-study, seminars, conferences, onthe-job, etc.) and begins from the first day on the job and con6nues regularly therea\er.

WBSD staff involved in responding to customer service calls, including sewage spills, receive annual training on the District’s Spill Emergency Response Plan. This training is part classroom and part hands-on exercises and drills for responding to spill events and includes containment, restoring flow, spill volume, volume recovered, and spill start 6me es6ma6ons, clean up and comple6ng the spill event data collec6on forms.

District Data Submi?ers and LROs are trained on the District’s procedures for submiQng data to the CIWQS database.

The District has developed spill response procedures for Contract Service personnel who perform work for the District are required to:
• Immediately no6fy the District of any sewage spill they encounter. • Make a?empts to contain the spill.
• Cordon off the area to keep the public safe.
• Remain onsite un6l District staff arrives and relieves them.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Has all training been completed as scheduled?
• Have records of training and a?endance been documented and maintained? • Have all staff demonstrated ability and knowledge a\er each training event? • Have contractors received, at a minimum, direc6on for repor6ng and responding to spills? 108

OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 29 of 57 ends

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

4.3.1 Review training documenta6on to ensure all staff have received required training Quarterly X

4.3.2 Review agreements with contractors and/or pre-job mee6ng minutes to ensure contract personnel have
received instruc6on for responding to sewage spills
Each Contract X
109

OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 30 of 57 ends

4.4. Equipment Inventory

WDR REQUIREMENTS
A?. D-4.4 (pg. D-5)
“An inventory of sewer system equipment, including the idenficaon of crical replacement and spare parts.”

COMPLIANCE
West Bay Sanitary District (WBSD) owns a variety of vehicles and equipment for both rou6ne maintenance and for con6ngency or emergency opera6ons and maintains spare parts, including cri6cal spare parts, to facilitate correc6ve ac6ons for the most common failure occurrences that might be encountered. .

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Have inventory lists been audited as scheduled?
• Have any inventory deficiencies or omissions been discovered and rec6fied? • Has the District experienced any equipment failure that inhibited a spill response?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

4.4.1 Audit inventory lists to ensure stock is adequate Annually X

4.4.2 Check with vendors to ensure lead 6mes for
cri6cal parts are as expected. Annually X

4.2.3 Ensure contracts with emergency support
services are current Annually X

RESILIENCE
Resilience is addressed in Element 4 by:
• Developing an SOP for upda6ng maps when errors are discovered. • Developing and using forms (paper or electronic) for data collec6on to help ensure all per6nent informa6on is consistently collected.
• Periodically evalua6ng inspec6on cycle intervals to help ensure they are op6mized. • Requiring staff to demonstrate ability and/or knowledge for all training ac6vi6es. • Monitoring equipment and cri6cal spare parts usage for and trends. • Performing periodic audits of the vehicle and equipment inventory List. 110

OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 31 of 57 ends

APPENDIX 4 INCLUSIONS:
• None
111

OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 32 of 57 ends

Specifica6ons 5.19 - Opera6ons and Maintenance

WDR REQUIREMENTS
Specifica6on. 5.19 (pg. 27)
“To prevent discharges to the environment, the Enrollee shall maintain in good working order, and operate as designed, any facility or treatment and control system designed to contain sewage and convey it to a treatment plant.”

COMPLIANCE
Below are brief descrip6ons of work programs performed by the West Bay Sanitary District on behalf of District:

Sewer Cleaning
The District’s primary sewer maintenance ac6vity is high pressure hydro-jeQng. The District has established a “Regular” Preventa6ve Maintenance (PM) applicable to every mainline pipe and a “High Frequency” PM cleaning program for pipes deemed to require a more frequent cleaning. These two cleaning programs are discussed below.

The Regular PM Cleaning consists of high-pressure hydro jet cleaning every gravity mainline pipe in the District ranging from 4” through 10” pipe, in 12–16-month intervals. Pipe sizes 12” to 21” are cleaned in 36- month intervals. Pipe sizes 24” to 54” are cleaned in 60-month (5 year) intervals. The District primary cleaning nozzle is the Worthog Nozzle for the ½ Inch Je?ers and the Hydraulic Rootsaw or Warthog for the ¾ inch and 1-inch je?ers; but for more aggressive root growth the Super Nova Chain Flail may be used.

Where the root saws are deployed, a proofing tool is u6lized to ensure a high-quality cleaning has been performed.

High Frequency PM consists of 1-, 3-, and 6-month high pressure hydro jet cleaning schedules for pipes needing more frequent cleaning. Mainline pipes deemed to require more frequent cleaning are cleaned on the High Frequency cleaning schedule. High Frequency schedules are determined by reviewing the history of mainline stoppages and overflows, and/or by CCTV assessment.

Post Spill Assessments (PSA) are performed on mainline sec6ons where a spill has occurred. A mainline sewer pipe is televised within two (2) working days of an overflow or back up. Upon review of the CCTV assessment, a High Frequency schedule may be assigned to the mainline sec6on, or a Point Repair may be scheduled.

Where necessary, a mainline is added to the CIP list for replacement/rehabilita6on. In the event the mainline pipe sec6on is added to the CIP list, the cleaning frequency will be increased, and that higher frequency cleaning schedule will be implemented un6l rehabilita6on and/or replacement is completed.

The District’s Siphons are on a 1-month cleaning schedule all other pipes are on a 3-, 6-, or 12-month schedules. Addi6onally, the schedules have been grouped by Basin so to reduce travel 6me and make cleaning processes more efficient.

Sewer Cleaning Results Matrix - The District collects all observa6ons made by its sewer cleaning crews regarding the extent and nature of materials removed during the cleaning process. The observa6ons are recorded in the District’s computerized informa6on management system. The District maintains or changes the frequency of its High Frequency PM Cleaning Program for a Sewer Line Segment based on the Sewer Cleaning Results and CCTV inspec6on. See Matrix below in accordance with the sec6on labeled “Ac6on.” Changes in cleaning frequency based upon cleaning results and or CCTV data shall be determined by the 112

OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 33 of 57 ends

District Collec6on System Opera6ons Superintendent or Assistant Superintendent and no reduc6on in cleaning frequency shall be made in a Sewer Line Segment with a previous history of spills without the approval of the District Collec6on System Assistant Opera6ons Superintendent, or Opera6ons Superintendent.

Root Control - Roots are removed mechanically, through high pressure hydro-jeQng and chain flailing during regular cleaning. Every effort is made to trap roots physically at the downstream manhole to remove them from the collec6on system. In 2010, the District funded and implemented a chemical root control treatment system in areas of the District with a history of root intrusion and difficult access. The root control treatment reduces the need for frequent visits by the Hydro-jet crews and significantly reduces spills in these areas.

This cost-effec6ve approach, which allowed cleaning crews to be more produc6ve in cleaning more pipeline in other areas of the District, will be con6nued in the future.

Odor Control - The District has few odor complaints – less than five per year. However, when odor complaints are received, District crews respond with an on-site inves6ga6on and improvements, if needed. For example, the District had been working with an isolated odor issue at the Corte Madera pump sta6on emana6ng from the Village Square Li\ Sta6on. In late 2016 the flows from the (former) Corte Madera Pump Sta6on were redirected to the new Sausal Vista Pump Sta6on. The District currently treats the Village Square pump sta6on with Helix-Commander odor control product to control the odors and H2S. Its effec6veness is measured regularly with the District’s OdaLogger Unit.

Inves6ga6on of Customer Complaints - The District places high priority on responding to customer complaints about sewer service. Complaints are generally related to sewer stoppages, overflows, or, less frequently, odors. Detailed informa6on about communica6on and the District’s response procedures are included in the District’s SERP, which is discussed further in Element 6. Response is performed by the field crews during work hours and the on-call staff member during nonworking hours. Response includes making a field assessment of the complaint and taking necessary ac6on(s) required to resolve the problem.

Increased preventa6ve maintenance may be implemented if the problem is mainline related to minimize recurrence of the issue. The District maintains a customer service survey process and regularly reviews customer service comments so that employees know how the District’s work is regarded by the public.

Customer Survey forms are reviewed regularly in an effort to achieve con6nuous improvement in customer service.

Condi6on Assessment - The District conducts closed circuit television (CCTV) inspec6ons of its sewer facili6es to evaluate their condi6on and iden6fy needed increased preventa6ve maintenance, repairs and rehabilita6on. This ac6vity has been further augmented by the purchase of two (3) Pipe Hunter Je?er Unit that performs CCTV during preventa6ve maintenance opera6ons which ensures the line is cleaned properly.

CCTV inspec6ons of the collec6on system are performed on a six (6) year cycle by District crews. In addi6on to inspec6on of exis6ng pipelines, the District performs CCTV inspec6on on newly installed pipelines and inspects pipelines which have experienced spills to assess cause of the overflow and to determine the best method and frequency of cleaning or needed repair to prevent a repeat spill. The District’s CCTV equipment records inspec6on informa6on that is stored in CMMS so\ware. CCTV data is then transferred to the District’s CMMS database. The District assigns condi6on ra6ngs as set forth by the Pipeline Assessment & Cer6fica6on Program (PACP) to each of the inspected pipelines using the protocol established by the Na6onal Associa6on of Sewer Service Companies (NASSCO). The District uploads pipeline condi6on ra6ngs on an ongoing basis into Lucity.

CCTV reports and videos, together with field observa6ons, form the basis for establishing needed system maintenance and repairs. Results are logged using fault (defect) codes and a numerical ra6ng scale (with 113

OPERATIONS AND MAINTENANCE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 34 of 57 ends

weights assigned to each type of defect). The ra6ngs reflect the rela6ve severity of the observed defects.

The table below is used as a guide for the selec6on of pipes for sewer repair or rehabilita6on.

Pipe Repairs - Point repairs are completed by District crews. Larger repairs are designed and compe66vely bid for construc6on through the District’s Capital Improvement Program. Other factors are considered for placing a pipe segment on the CIP such as:
• Maintenance history,
• Number of defects within a segment,
• Spills history if any,
• Impact should a spill occur, and
• Remaining useful life of pipeline.

Service Laterals - All side sewers, from the connec6on to the District public sewer to the property served, are the property of, solely owned by, and sole responsibility of the property owner. However, the District does, as a courtesy, provide blockage clearing services from a conforming property line cleanout to the mainline sewer when requested by the property owner.

WBSD par6cipates in the Bay Area Clean Water Agency (BACWA) public outreach commi?ee and, as a member of this group, has helped to develop a handout for plumbers that apply for permits to perform sewer lateral repairs and/or replacements. In addi6on, the District provides standard details for repair and replacement work that can be used by plumbers, contractors, or homeowners. This informa6on is available on the District’s website and at the District’s front office counter. 114

SPILL EMERGENCY RESPONSE PLAN
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 35 of 57 ends

5. Design and Performance Provisions

5.1. Updated Design Criteria/Construc6on Standards/Specifica6ons

WDR REQUIREMENTS
A?achment D-5.1 (pg. D-5)
“Updated design criteria, and construcon standards and specificaons, for the construcon, installaon, repair, and rehabilitaon of exisng and proposed system infrastructure components, including but not limited to pipelines, pump staons, and other system appurtenances. If exisng design criteria and construcon standards are deficient to address the necessary component-specific hydraulic capacity as specified in secon 8 (System Evaluaon, Capacity Assurance and Capital Improvements) of this AAachment, the procedures must include component-specific evaluaon of the design criteria.”

COMPLIANCE
The District’s Standard Specifica6ons include design and performance provisions in accordance with current WDR requirements, including:
• Design and construc6on standards and specifica6ons for the installa6on of new sanitary sewer systems, pump sta6ons and other appurtenances; and for the rehabilita6on and repair of exis6ng sanitary sewer systems.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Are plan checking QA/QC processes helping to ensure adherence to the standards?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

5.1.1 Ensure all project plans are approved in accordance with the District’s Standard Specifica6ons and Details. Each Project X X

5.1.2 Verify design standards and hydraulic model previously completed are adequate and consistent with current
standards of prac6ce.
2025 X X
115

SPILL EMERGENCY RESPONSE PLAN
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 36 of 57 ends

5.2. Procedures and Standards

WDR REQUIREMENTS
A?achment D-5.2 (pg. D-5)
“Procedures, and standards for the inspecon and tesng of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.”

COMPLIANCE
The District Standard Specifica6ons include procedures and standards for inspec6ng and tes6ng the installa6on of new sewers and sewer appurtenances and for rehabilita6on and repair work.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Were any design or installa6on deficiencies found during warranty inspec6ons? • Are devia6ons from standard procedures and/or specs, tes6ng, etc., jus6fied and documented? • Does the District stay abreast of industry design standards and technical advances in the industry?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

5.2.1 Verify inspec6on procedures are adequate and
consistent with current standards of prac6ce 2017 (10-year cycle) X

5.2.2 Verify design standards and hydraulic model
previously completed are adequate and
consistent with current standards of prac6ce.
2017 (10-year cycle) X

RESILIENCE
Resilience is addressed in Element 5 by:
• Staying abreast of industry trends and standards.
• Performing warranty inspec6ons of newly installed or repaired assets to evaluate design and installa6on prac6ces.
• Evalua6ng as-built changes for trends and areas for design and performance improvements.

APPENDIX 5 INCLUSIONS:
• None
116

SPILL EMERGENCY RESPONSE PLAN
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 37 of 57 ends

6. Spill Emergency Response Plan

WDR REQUIREMENTS
AAachment D-6 (pg. D-6)
“The Plan must include an up-to-date Spill Emergency Response Plan to ensure prompt detecon and response to spills to reduce spill volumes and collect informaon for prevenon of future spills. The Spill Emergency Response Plan must include procedures to:
• Nofy primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a mely manner;
• Nofy other potenally affected enes (for example, health agencies, water suppliers, etc.) of spills that potenally affect public health or reach waters of the State; • Comply with the noficaon, monitoring and reporng requirements of this General Order, State law and regulaons, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
• Address emergency system operaons, traffic control and other necessary response acvies; • Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
• Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
• Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters;
• Implement technologies, pracces, equipment, and interagency coordinaon to expedite spill containment and recovery;
• Implement pre-planned coordinaon and collaboraon with storm drain agencies and other ulity agencies/departments prior, during, and a<er a spill event; • Conduct post-spill assessments of spill response acvies; • Document and report spill events as required in this General Order; and • Annually, review and assess effecveness of the Spill Emergency Response Plan, and update the Plan as needed.”

COMPLIANCE
The West Bay Sanitary District responds to all sewer-related service calls on behalf of the District and responds in accordance with the WBSD Spill Emergency Response Plan (SERP), which is compliant with current WDR requirements. The District has contracted with Fischer Compliance LLC to develop a Spill Emergency Response Plan (SERP) that is in sync with the West Bay Sanitary District SERP, to meet the 117

SPILL EMERGENCY RESPONSE PLAN
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 38 of 57 ends

requirements of the WDR, which became effec6ve on June 5, 2023. It is an6cipated to be completed prior to December 2025.

WBSD staff received ini6al training and subsequent SERP training. A copy of the WBSD SERP is available for viewing upon request.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Have staff’s spill response efforts helped to prevent the discharge of sewage to surface waters? • Do post-spill assessments indicate staff are following the procedures outlined in the SERP? • Is SERP training effec6ve and are trainees demonstra6ng adequate knowledge and abili6es?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

6.1 Perform SERP training including prac6ce drills. Annually X X

6.2 Review Post Spill Assessments to ensure adherence with the SERP and to iden6fy any trends that should be
addressed.

Annually X X

RESILIENCE
Resilience is addressed in Element 6 by:
• Mul6ple staff are trained to respond to spill events. • Post-spill assessments are conducted to evaluate staff’s adherence to the SERP and to iden6fy areas for improvement.
• Data collec6on forms are used to direct staff to collect all the required data to be submi?ed to CIWQS and are designed as a guide to a proper spill event response. • The District employees several different spill volume es6ma6on methods to account for different circumstances.

APPENDIX 6 INCLUSIONS:
• None
118

SEWER PIPE BLOCKAGE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 39 of 57 ends

7. Sewer Pipe Blockage Program

WDR REQUIREMENTS
A?achment D-7 (pg. D-7)
“The Sewer System Management Plan must include procedures for the evaluaon of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide jusficaon in its Plan for why a program is not needed.

The procedures must include, at minimum:
• An implementaon plan and schedule for a public educaon and outreach program that promotes proper disposal of pipe-blocking substances;
• A plan and schedule for the disposal of pipe-blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilies and/or addional facilies needed to adequately dispose of substances generated within a sanitary sewer system service area;
• The legal authority to prohibit discharges to the system and idenfy measures to prevent spills and blockages.
• Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management pracces requirements, recordkeeping and reporng requirements;
• Authority to inspect grease producing facilies, enforcement authories, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance; • An idenficaon of sanitary sewer system secons subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each secon; and • Implementaon of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each secon idenfied above.”

COMPLIANCE
In many sanitary sewer collec6on systems, Fats, Oils, and Grease (FOG) is known to be a significant cause, and or contributor, of sewer blockages in pipe and the cause of opera6onal disrup6ons and damage to sewage pump sta6ons. Although service areas that include commercial and ins6tu6onal food service establishments (FSEs) are obvious sources of FOG, residen6al communi6es, especially those of medium and high-density mul6-family residences, can also be a significant source of FOG. It is the purpose of the FOG Control Program to ensure all customers in our service area are following the District Ordinance, and state and federal requirements, to prevent sewage overflows caused by FOG related blockages in our sewer collec6on system.
• Outreach and educa6on are a significant component of the District’s environmental programs.

Newsle?ers with descrip6ons of BMPs for food facili6es are distributed to educate the FSEs about minimizing the impact of FOG on the collec6on system.

Outreach for residents has also been a component of the program. East Palo Alto residents have received inserts educa6ng them on the problems caused by improper disposal of FOG to the sewer 119

SEWER PIPE BLOCKAGE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 40 of 57 ends

system. Messages include simple BMPs such as disposing of used cooking oils and grease in the trash a\er placing them in sealed containers or absorbing them onto paper towels. • The District’s Ordinance dated December 2024 “Establishing Rules and Regula6ons that Apply to Discharges of Wastewater Containing Fats, Oils, and Grease (FOG) Conveyed to the Wastewater Facili6es from any Commercial or Ins6tu6onal Food Service Establishment”, Sec6on 05 Maintenance Requirements, (B) requires grease haulers be licensed and to dispose of accumulated grease at an approved recycling or disposal site. Pumping schedules are site specific and based on grease interceptor performance.

Grease and other pipe blocking substances collected during the course of rou6ne system maintenance is disposed of at the WBSD FERF facility, on an as-needed basis. • The legal authority to prevent discharges to the collec6on system is provided in the District’s Sewer Use Ordinance 39 and City of Palo Alto Sewer Use Ordinance 16.09. • The requirement to install and maintain grease removal devices is provided in District Ordinance “Establishing Rules and Regula6ons that Apply to Discharges of Wastewater Containing Fats, Oils, and Grease (FOG) Conveyed to the Wastewater Facili6es from any Commercial or Ins6tu6onal Food Service Establishment”, Sec6on 04 Grease Control Device requirements, Sec6on 05, Maintenance Requirements, Sec6on 06, Kitchen BMPs, and Sec6on 07, Recordkeeping Requirements.

• The Authority to inspect grease producing establishments is provided in the District Ordinance dated December 2024.
• Ethe District has had an ongoing preventa6ve maintenance program that includes regular cleaning and inspec6ons of more than 35 miles of collec6on system piping. The District has iden6fied areas. requiring more frequent cleaning based on past experience and upon data collected during CCTV inspec6ons.
• West Bay Sanitary District (WBSD) performs facility inspec6ons for the District. WBSD, Water Quality Department, has two Source Control Inspectors who perform facility inspec6ons of all commercial and industrial businesses within the District’s sphere of influence, which includes East Palo Alto Sanitary District. One of the func6ons of this department is to ensure that FOG-related businesses (restaurants, food prepara6on facili6es, vehicle service facili6es, etc.) are inspected on a regular basis and maintain consistent compliance with the District’s Code of General Regula6ons, and state and local ordinances related to FOG.

The FSEs are categorized by their poten6al to contribute FOG to the collec6on system or cause other problems such as storm water viola6ons. Facili6es located in hot spots or that have been problema6c will be addressed first and receive more frequent inspec6ons. Bringing some facili6es into compliance may be a lengthier process requiring mul6ple follow-up inspec6ons. Some facili6es 120

SEWER PIPE BLOCKAGE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 41 of 57 ends

will frequently not meet all requirements and will need ongoing a?en6on. These facili6es will be re-visited as necessary. Facili6es that demonstrate compliance will receive less a?en6on.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Have there been any blockages/spills from any iden6fied problem area? • Is the District receiving feedback on public outreach efforts? • Are the debris and other sewage solids collected during cleaning ac6vi6es being disposed of appropriately?
• Have there been spills due to excessive fats, oil, grease, roots, or non-disposable wipes discovered in the sewer system during the audit period?
• Are there repeat offenders among FSEs?
• Are enforcement trends decreasing?
• Are Source Control and Collec6on staff included in the plan check process?

IMPLEMENTATION PLAN/SCHEDULE
No Plan Schedule Responsible Party
PWD UM

7.1 Review/evaluate enforcement and inspec6on findings and implement changes as necessary. Annually X X

7.2 Review spill rates and causes and make changes to
maintenance programs, as necessary. Annually X X
121

SEWER PIPE BLOCKAGE PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 42 of 57 ends

RESILIENCE
Resilience is addressed in Element 7 by:
• Inspec6on of select assets directly downstream of grease producing businesses to ensure source control is effec6ve.
• Residen6al FOG outreach and educa6on program.
• Performance of regular assessments of system assets to monitor performance. • QA/QA process for evalua6ng pipe cleaning effec6veness. • Daily disposal of pipe blocking materials retrieved during maintenance ac6vi6es.

APPENDIX 7 INCLUSIONS:
• None
122

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 43 of 57 ends

8. System Evalua6on, Capacity Assurance, Capital Improvements

WDR REQUIREMENTS
A?achment D-8 (pg. D-)
“The Plan must include procedures and acvies for:
• Rou6ne evalua6on and assessment of system condi6ons;
• Capacity assessment and design criteria;.
• Priori6za6on of correc6ve ac6ons; and
• A capital improvement plan.”

8.1. System Evalua6on and Condi6on Assessment

WDR REQUIREMENTS
A?achment D-8.1 (pgs. D-7/D-8)
“The Plan must include procedures to:
• Evaluate the sanitary sewer system assets u6lizing the best prac6ces and technologies available; • Iden6fy and jus6fy the amount (percentage) of its system for its condi6on to be assessed each year; • Priori6ze the condi6on assessment of system areas that:
 Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies;
 Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevaons, and environmentally sensive areas;
 Are within the vicinity of a receiving water with a bacterial-related impairment on the most current Clean Water Act secon 303(d) List.
• Assess the system condi6ons using visual observa6ons, video surveillance and/or other comparable system inspec6on method;.
• U6lize observa6ons/evidence of system condi6ons that may contribute to exi6ng of sewage from the system which can reasonably be expected to discharge into a water of the State; • Maintain documents and recordkeeping of system evalua6on and condi6on assessment inspec6ons and ac6vi6es; and
• Iden6fy system assets vulnerable to direct and indirect impacts of climate change, including but not limited to: sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disrup6ons.”
123

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 44 of 57 ends

COMPLIANCE
The above requirements are addressed below:
• The assessment of a collec6on system involves pipelines and manholes. The assessment of pipeline condi6on is the most significant condi6on assessment responsibility the District has. It is of key importance to regularly perform pipeline condi6on assessments to ini6ally establish a condi6on baseline and to monitor condi6on changes over 6me.
 The District contracts maintenance ac6vi6es to West Bay Sanitary District (WBSD). It is an6cipated all gravity pipes will be inspected by Spring of 2026, as WBSD is pursuing an aggressive one year schedule to complete their ini6al baseline assessment. Upon comple6on, the CCTV findings will be evaluated to determine pipe performance for each manhole-to-manhole pipe segment. This evalua6on will be used, along with historic performance data, cleaning intervals and findings, and repair and rehabilita6on schedules to determine the op6mal CCTV inspec6on return interval moving forward. • The District will use the findings from the condi6on assessment endeavor (men6oned above) to determine pipe performance and then iden6fy por6ons of the sewer system that are close to sensi6ve areas, such as surface waters, schools, hospitals, and may place a higher priority on these assets for public health, safety and environmental reasons.
• The District u6lizes the NASSCO PACP defect coding system to rank defects found during CCTV inspec6ons of gravity mains. Manholes are visually inspected and documented by CCTV crews, employing a top-down inspec6on method, during rou6ne CCTV ac6vi6es.

Areas iden6fied as possibly suscep6ble to erosion or landslides and creek crossings pipes, including siphons are visually inspected a\er significant rain events.

As a ma?er of prac6ce, District crews are trained to monitor system assets for spills, sink holes, loose or ill-fiQng lids, construc6on ac6vi6es, etc., while driving and performing their work throughout the service area.
• The District is not aware of exfiltra6on from the system. Any discoveries of exfiltra6on would be considered high priority will be addresses accordingly. • The District maintains records and documenta6on of all system evalua6on and condi6on assessment inspec6ons and ac6vi6es in its Lucity CMMS.
• A rise in sea level could lead to flooding from King Tide events. This has been mostly mi6gated by the raising of levees in the surrounding area. The poten6al for damage caused by wildfire is remote and related power outages would not affect District opera6ons, as all flows are conveyed by a gravity system. The District will evaluate the poten6al impacts from climate change at least every three years during SSMP Audits.

EFFECTIVENESS
124

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 45 of 57 ends

The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Has the District maintained its schedule for (information needed) and is data being reviewed in a 6mely manner?
ο CCTV Gravity Mains
ο Laterals
ο Manholes
ο Pump Sta6ons
• Are inspec6on efforts discovering deficiencies in a 6mely manner? • Are maintenance and inspec6on ac6vi6es being properly documented?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

8.1.1 Review/evaluate enforcement and inspec6on findings and implement changes as necessary. Annually X X

8.1.2 Review spill rates and causes and make changes to maintenance programs, as necessary. Annually X X

8.1.3 Hold mee6ng to discuss any issues that may result from climate changes. Annually X X

8.2. Capacity Assessment and Design Criteria

WDR REQUIREMENTS
A?achment D-8.2 (pgs. D-8/D-9)
125

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 46 of 57 ends

“The Plan must include procedures to idenfy system components that are experiencing or contribung to spills caused by hydraulic deficiency and/or limited capacity, including procedures to idenfy the appropriate hydraulic capacity of key system elements for:
• Dry-weather peak flow condions that cause or contributes to spill events; • The appropriate design storm(s) or wet weather events that causes or contributes to spill events. • The capacity of key system components; and
• Idenfy the major sources that contribute to the peak flows associated with sewer spills.

The capacity assessment must consider:
• Data from exisng system condion assessments, system inspecons, system audits, spill history, and other available informaon;
• Capacity of flood-prone systems subject to increased infiltraon and inflow, under normal local and regional storm condions;
• Capacity of systems subject to increased infiltraon and inflow due to larger and/or higherintensity storm events as a result of climate change; • Increases of erosive forces in canyons and streams near underground and above-ground system components due to larger and/or higher-intensity storm events; • Capacity of major system elements to accommodate dry weather peak flow condions, and updated design storm and wet weather events; and
• Necessary redundancy in pumping and storage capacies.”

COMPLIANCE
The District updated its East Palo Alto Sanitary District Master Plan in 2015 AND issued the Addendum to Master Paster Plan in 2021. The master planning effort evaluated the capacity of the exis6ng sanitary sewer system assets and provided capacity design criteria for future assets. Projects within the District's service area are primarily to serve future redevelopment. The District includes impact fees within the connec6on fees to help contribute to future downstream projects needed for extra pipe capacity.

By metering, the District periodically monitor’s the flow in its sanitary sewer system to iden6fy capacity deficiencies and to monitoring the quan6ty of inflow and infiltra6on present.

The capacity-related design criteria are included in the SSMP Design and Performance Provisions.

Not all of the requirements listed above were considered during this evalua6on, as the evalua6on was performed prior to the issuance of these regula6ons. Future capacity assessments will be in complete compliance.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Number of capacity-related spills or surcharge condi6on during the audit period. • Has the system responded to rain events as indicated by the hydraulic model? 126

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 47 of 57 ends

• Has there been any changes to zoning designa6ons (residen6al, commercial, industrial)?

IMPLEMENTATION PLAN/SCHEDULE
No Plan Schedule Responsible Party
PWD UM

8.2.1 Monitor/evaluate significant rain
events to see if they exceed the
design storm in the hydraulic model.

Each significant rain evet
X

8.2.2 Iden6fy and monitor flood-prone
areas suscep6ble to erosion from rain
events
A\er each significant rain event
X

8.2.3 Monitor flows in each basin and
update the hydraulic model
Per Engineering Department
schedule X
127

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 48 of 57 ends

8.3. Priori6za6on of Correc6ve Ac6on

WDR REQUIREMENTS
A?achment D-8.3 (pg. D-9)
“The findings of the condion assessments and capacity assessments must be used to priorize correcve acons. Priorizaon must consider the severity of the consequences of potenal spills.”

COMPLIANCE
The District ranks pipe defects using the NASSCO PACP pipe ra6ng system. Priori6es are established based on likelihood and consequence of failure, as determined by staff. In addi6on to these ra6ngs, staff considers the poten6al public health and environmental consequence when priori6zing repair and rehabilita6on projects.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Has the District adhered to its system evalua6on/condi6on assessment schedule? • Has the District adhered to its priori6za6on/correc6ve procedures for sewer repair and capacity improvement projects?
• Have projects been completed before deficiencies caused failures?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

8.3.1 U6lize all available data for priori6zing correc6ve ac6ons considering severity and consequences of
poten6al spills.

Each CIP Update X

8.3.2 Maintain documents and recordkeeping of system
evalua6on and condi6on assessment inspec6ons
and ac6vi6es.

Con6nuously X X
128

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 49 of 57 ends

8.4. Capital Improvement Plan

WDR REQUIREMENTS
A?achment D-8.4 (pg. D-9)
“The capital improvement plan must include the following items:
• Project schedules include compleon dates for all porons of the capital improvement program; • Internal and external project funding sources for each project; and • Joint coordinaon between operaon and maintenance staff, and engineering staff/consultants during planning, design, and construcon of capital improvement projects; and Interagency coordinaon with other impacted ulity agencies.”

COMPLIANCE
The District includes publicly funded capacity enhancement projects in its Capital Improvement Program.

The Capital Improvement Program includes recommended projects to address capacity deficiencies in the system. The capital improvement projects planned for the next 15 years are described within the Master Plan (Appendix M).

The schedule for the District’s capacity enhancement projects is included in the District’s CIP. The CIP in the 2021 Addendum iden6fies pipelines that require repair and replacement to prevent manhole surcharging and poten6al SSOs. It also iden6fies increases in capacity needed to account for future developments based on modified zoning designa6ons. Pipeline improvements are iden6fied, and the sequence of construc6on will be determined based on District’s observa6ons of exis6ng pipe condi6ons and new development needs.

It is an6cipated that approximately $1.0M per year will be allocated to implemen6ng the CIP independent of developer contribu6ons to accelerate specific projects.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Has the District’s capital improvement plan schedule been adhered to?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

8.4.1 Hold regular coordina6on mee6ngs, with all
par6es, to help keep the projects on track and
resolve issues that may arise in a 6mely manner.

Annually X X

8.4.2 For schedules that are not followed, jus6fy and
document the reason.

Each Delayed
Project X
129

SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS © 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 50 of 57 ends

RESILIENCE
Resilience is addressed in Element 7 by:
• Is there an annual review of the Capital Improvement Plan by all appropriate individuals including both Engineering and Opera6ons?
APPENDIX 8 INCLUSIONS
• None
130

MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 51 of 57 ends

9. Monitoring, Measurement, and Program Modifica6ons

WDR REQUIREMENTS
A?achment D-9 (pg. D-9)
“The Plan must include an Adapve Management secon that addresses Plan-implementaon effecveness and the steps for necessary Plan improvement, including:
• Maintaining relevant informaon, including audit findings, to establish and priorize appropriate Plan acvies;
• Monitoring the implementaon and measuring the effecveness of each Plan element;. • Assessing the success of the prevenve operaon and maintenance acvies:
• Updang Plan procedures and acvies, as appropriate, based on results of monitoring and performance evaluaons; and
• Idenfying and illustrang spill trends, including spill frequency, locaons, and esmated volumes.”

COMPLIANCE
The above requirements are addressed below:
• The District maintains accurate and relevant inspec6on and maintenance records for the collec6on system. Much of the documenta6on today is maintained electronically, which allows for ease of access and analysis. This helps District staff to make sound decisions and priori6ze ac6vi6es when dealing with the rou6ne and the unexpected.
• Monitoring of the District’s SSMP focuses on each element in terms of its implementa6on and effec6veness. The SSMP has been designed to include key performance indicators for each element, which are used to measure effec6veness. In addi6on, implementa6on responsibili6es are included for each element to help ensure the SSMP is being implemented as intended. • The District assesses the success of maintenance and opera6on ac6vi6es by ensuing ac6vi6es are being performed as expected, by monitoring actual outcomes compared to intended outcomes, as well as monitoring spill trends.
• The District is commi?ed to con6nuous improvement and monitors and evaluates performance of work programs and SSMP elements to ensure intended outcomes are achieved while looking for areas for improvement. Although the SWRCB requires that the SSMP be updated every six years, the SSMP should be considered as a dynamic document and may require upda6ng on a more frequent basis.

Rou6ne changes to administra6ve informa6on, notwithstanding, minor changes will likely be required to address improvements iden6fied through the SSMP Audit or through modifica6ons required as condi6ons change.
• The District monitors spill trends, at a minimum every three years during required audits, u6lizing the CMMS database, inspec6on records and CIWQS data. These resources are helpful in planning and programing work, and adjus6ng as needed, enabling the District to be adap6ve and capitalize on lessons learned.
131

MONITORING, MEASUREMENT, AND PROGRAM MODIFICATIONS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 52 of 57 ends

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Are SSMP Elements being periodically evaluated for effec6veness? • Are work ac6vi6es and spill events being documented?
• Has a plan and schedule been established to address audit findings/deficiencies from the last audit? • Is Trend Analysis being performed on spill causes?
• Have work programs been assessed and updated as necessary?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

9.1 Assess work programs to ensure
outcomes are as intended. Annually X

9.2 Prepare updates to work programs
and the SSMP based on assessments. As Needed X

9.3 Monitor and evaluate spill trends.

Document efforts. Annually X

RESILIENCE
Resilience is addressed in Element 9 by:
• Development of key performance indicators to measure effec6veness of the SSMP. • Performing periodic reviews of the SSMP to help ensure it is being properly implemented. • Developing and adhering to a 6meline to correct deficiencies found during the audit process. • Periodically evalua6ng work programs to help ensure effec6veness.

APPENDIX 9 INCLUSIONS:
• None
132

INTERNAL AUDITS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 53 of 57 ends

10. Internal Audits

WDR REQUIREMENTS
A?achment D-10 (pg. D-10)
“The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with secon 5.4 (Sewer System Management Plan Audits) of this General Order.”

COMPLIANCE
The District completed its last audit in August 2024 and will complete audits every three (3) years moving forward. The objec6ve of the audit is to evaluate compliance, implementa6on and effec6veness of the SSMP. Addi6onally, the SSMP includes a descrip6on of how the District will comply with the requirements of each Element. The audit review includes an evalua6on to determine if compliance has been met.

Implementa6on is evaluated by determining if the District is execu6ng the SSMP as stated.

Effec6veness is evaluated by using key performance indicators, which have been developed specifically for each element.

Resilience is addresses for each Element and is built-in to the District’s collec6on system procedures and prac6ces.

Any deficiencies discovered through the audit process are noted and a plan and schedule to implement correc6ve measures are established.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Have audits been performed as required?
• Have the audits assessed compliance, implementa6on, and effec6veness? • Have deficiencies been iden6fied?
• Has a plan and schedule to rec6fy the deficiencies been established?

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

10.1 Schedule audits in advance of due dates to
ensure adequate 6me to complete. District has
6 months to complete the audit from the end
of the audit period.

Beginning at end of
audit period X

10.2 Ensure a plan and schedule is developed to
address deficiencies.

Once the Audit is
completed X
133

INTERNAL AUDITS
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 54 of 57 ends

RESILIENCE
Resilience is addressed in Element 10 by:
• Periodically evalua6ng key performance indicators during the audit period to assess effec6veness and make correc6ons, if necessary, prior to the audit.
• Evalua6ng previous audits to ensure deficiencies have been rec6fied. • Scheduling the audit due dates and comple6ng the audit on 6me.

APPENDIX 10 INCLUSIONS:
• None
134

COMMUNICATION PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 55 of 57 ends

11. Communica6on Program

WDR REQUIREMENTS
A?achment D-11 (pg. D-10)
“The Plan must include procedures for the Enrollee to communicate with:
• The public for:
o Spills and discharges resulng in closures of public areas, or that enter a source of drinking water; and
o The development, implementaon, and update of its Plan, including opportunies for public input to Plan implementaon and updates.
• Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for:
o System operaon, maintenance, and capital improvement-related acvies.”

COMPLIANCE
• When the District experiences a spill, it is standard procedure to secure the affected area and keep the public away. This is generally done using barricades, cones and cau6on tape. The District will always follow San Mateo County Environmental Health recommenda6ons.

There are opportuni6es for stakeholders and the public to par6cipate and provide input on the development and update of the District’s Sewer System Management Plan. The District posts the Sewer System Management Plan on their website, which includes a Contact Us feature, making it convenient for the public to communicate with the District. Every 6 years the SSMP is updated and approved by the Board of Directors. All Board agenda items are adver6sed to the public prior to the mee6ngs and there is opportunity for comment from the public on each agenda item. • The District does not currently have satellite systems.

EFFECTIVENESS
The District u6lizes the following Key Performance Indicators for measuring effec6veness of this Element:
• Does the District place all SSMP ac6on items on the agenda for regular counsel/board mee6ngs? • Does the District have signage, or other means, readily available to no6fy the public of environmental or public risk factors related to a sewage spill?
• Does the District perform outreach to residen6al customers? 135

COMMUNICATION PROGRAM
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 56 of 57 ends

IMPLEMENTATION PLAN/SCHEDULE
No. Plan Schedule Responsible Party
PWD UM

11.1 Ensure the Board of Directors
approves the SSMP per schedule. Every 6 years X X

11.2 Ensure the SSMP is posted on the
District website and the link func6ons
properly.

Annually X X

11.3 Ensure Sewage Spill Warning signs are
readily available to communicate with
the public when necessary
Annually X

RESILIENCE
Resilience is addressed in Element 11 by:
• Use the SSMP as a tool to communicate to the public how the District is managing the system. • Maintain a consistent presence in the service area by a?ending community events or issuing periodic newsle?ers or other communica6ons to the public.
• Make it clear and easy for the public to contact the District.

APPENDIX 11 INCLUSIONS
• None
136

APPENDICIES
© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for East Palo Alto Sanitary District use only

Page 57 of 57 ends

LIST OF APPENDICIES
APPENDIX 1 • None
APPENDIX 2 • None
APPENDIX 3 • None
APPENDIX 4 • None
APPENDIX 5 • None
APPENDIX 6 • None
APPENDIX 7 • None
APPENDIX 8 • None
APPENDIX 9 • None
APPENDIX 10 • None
APPENDIX 11 • None
APPENDIX 12 • None
137
EPASD BOARD CONSENT ITEM 10.2

EAST PALO ALTO

SANITARY DISTRICT

STAFF REPORT
DATE: July 29, 2025
TO: Honorable Members of the City of East Palo Alto City Council, Governing Board to the East Palo Sanitary District, a Subsidiary of the City of East Palo Alto
VIA: Melvin E. Gaines, General Manager
BY: Humza Javed, District Engineer
Nancy Murguia, Management Analyst
SUBJECT: 2025 Sewer System Master Plan
Recommendation
Adopt a resolution:

1. Approving the 2025 Sanitary Sewer System Master Plan; and

2. Finding that the proposed action being considered by the City Council is exempt from the California Environmental Quality Act (CEQA) because it requires the implementation of management operations programs and plans to enhance and protect the environment by limiting the occurrence of SSOs in the City. (CEQA Guideline section 15308).

Further, implementation of the proposed action may require the installation of minor sewer system facilities which will involve either minor alterations to existing facilities, or repair or replacement of existing facilities involving negligible or no expansion of sewer capacity, and as such, are exempt from review under CEQA Guidelines sections 15301 and 15302.

Alignment with City Council Strategic Plan
This recommendation is primarily aligned with:

Public Infrastructure and Utilities
Background
On November 15, 2023, the San Mateo Local Agency Formation Commission (LAFCo) unanimously approved the City of East Palo Alto’s application to designate the East Palo Alto 138
EPASD BOARD CONSENT ITEM 10.2
Sanitary District (EPASD or the District) as a subsidiary district of the City. The reorganization took effect on October 1, 2024, when the City Council assumed governance of EPASD. EPASD remains a legally separate entity from the City, and its assets are kept distinct.

The City of East Palo Alto has a contract with Freyer & Laureta, Inc. (F&L) to provide engineering support services for EPASD (for which the EPASD reimburses the City), including development of a 2025 Sanitary Sewer System Master Plan (Master Plan). F&L has been working on the Master Plan since the beginning of this year, and it has provided progress updates on the Master Plan development at three previous EPASD Advisory Committee meetings.

At the June 25, 2025, EPASD Advisory Committee meeting, the Advisory Committee recommended approval of the Master Plan to the EPASD Board.

Additionally, the Planning Commission reviewed conformance of the projects in the Master Plan with the City’s General Plan at the July 14, 2025, Planning Commission meeting.

The Master Plan was presented to the EPASD Board on July 15, 2025. The Board directed staff to postpone the item till the July 29, 2025, City Council meeting in order to allow the development community additional time to provide input.

Analysis
The Master Plan is intended to provide the District with an overall plan for sanitary sewer infrastructure improvements over the next twenty years to maintain sanitary sewer system reliability and support anticipated development within the City.

The scope of the Master Plan includes:
 Summarizing and describing the District’s service area and existing sanitary sewer system.
 Assessing current and projected sanitary sewer demands, including identifying potential vulnerabilities to inflow and infiltration (I/I) during wet weather events.  Establishing performance, operational, and reliability criteria for evaluating system capacity and identifying rehabilitation and replacement needs.  Constructing, calibrating, and evaluating a new hydraulic model to assess the system’s capacity to convey existing and future flows, including Average Dry Weather Flow (ADWF) and Peak Wet Weather Flow (PWWF), and identifying potential capital improvements.
 Preparing a comprehensive evaluation of the system’s capacity, redundancy, resiliency, and rehabilitation and replacement needs over a 20-year planning horizon.
 Verifying the need, sizing, and prioritization of planned sanitary sewer system improvements.
139
EPASD BOARD CONSENT ITEM 10.2
 Developing a 20-year, risk-based Capital Improvement Program (CIP) that prioritizes existing capacity deficiencies and plans for future improvements based on system needs and risk of sanitary sewer overflows.
 Developing a preliminary cash flow analysis to support long-term financial planning and inform Board decision-making.

The Draft 2025 Master Plan is included as an attachment to this staff report. Additionally, the final updated copy of the Master Plan will live on the City website at the following link:
https://www.cityofepa.org/sanitary/page/sanitary-district-documents Projects
As part of the Master Plan, projects were identified for the next twenty years. Projects are categorized as follows:
 Category 1 projects address existing capacity related deficiencies that represent the highest priority projects. These projects address existing capacity deficiencies.  Category 2 projects address future development capacity related deficiencies and would be implemented in phases as new development projects move through the City’s Planning and Building approval processes.
 Category 3 projects are those that address structural deficiencies and aging infrastructure with the highest priority projects to be addressed over a twenty-year horizon with ongoing annual funding to eventually replace all of the sanitary sewer pipelines within the collection system. These projects were identified by Sierra West (EPASD’s previous engineering consultant) as those that exhibit the worst structural conditions and can be implemented in phases. Following completion of high priority projects, the remaining pipeline segments (approximately 143,000 linear feet) will be replaced over a 20-year period.

Table 1 – Capital Projects
Category Project
Opinion of
Probable Project
Cost
1 Existing Capacity Deficiency: Westside $7.8 Million
1 Existing Capacity Deficiency: Eastside $9.4 Million
2 Future Development Capacity Deficiency $52.8 Million
3 Structural Deficiency (High Priority) $7.7 Million
Detailed project information is included on the project summary sheets in the SSMP.

Staff provided a comprehensive presentation of the Master Plan during the July 15, 2025, Board meeting.

Fiscal Impact
There is no direct fiscal impact with the adoption of this plan. The EPASD Board will need to adopt a separate capital budget to proceed with the individual projects. 140
EPASD BOARD CONSENT ITEM 10.2
Public Notice
The public was provided notice by making the agenda and report available at the City’s website and on a bulletin board located at City Hall: 2415 University Avenue, East Palo Alto.

Environmental
The action being considered by the City Council is exempt from the California Environmental Quality Act (CEQA) because it requires the implementation of management operations programs and plans to enhance and protect the environment by limiting the occurrence of SSOs in the City. (CEQA Guideline section 15308).

Further, implementation of the proposed action may require the installation of minor sewer system facilities which will involve either minor alterations to existing facilities, or repair or replacement of existing facilities involving negligible or no expansion of sewer capacity, and as such, are exempt from review under CEQA Guidelines sections 15301 and 15302.

Attachments

1. Resolution

2. Sewer System Master Plan Final Draft
141
1 of 2
RESOLUTION NO. XX – 2025

A RESOLUTION OF THE CITY COUNCIL

OF THE CITY OF EAST PALO ALTO
APPROVING AND ADOPTING THE 2025 SEWER SYSTEM MASTER PLAN WHEREAS, the purpose of the Sewer System Master Plan (“SSMP”) is to assess and evaluate the City’s existing sewer system facilities; and WHEREAS, on October 1, 2024, the City Council assumed governance of the East Palo Alto Sanitary District (EPASD) and has contracted with Freyer & Laureta, Inc. (F&L) to provide engineering support services to EPASD, including development of a 2025 SSMP; and WHEREAS, the SSMP is inclusive of the recommended Capital Improvement Projects (CIP), and currently includes a total of thirteen (13) projects with an estimated total cost of approximately $78 million slated for completion over the course of the next twenty years; and WHEREAS, on June 25, 2025, the EPASD Advisory Committee recommended approval of the SSMP to the EPASD Board; and
WHEREAS, on July 14, 2025, the Planning Commission confirmed the conformity of the projects in the Sewer System Master Plan with the City’s General Plan; and WHEREAS, on July 15, 2025, the City Council discussed and considered adopting the Sewer System Master Plan, and ultimately continued the item until July 29, 2025; and WHEREAS, on July 29, 2025, the City Council discussed the item once more and this time determined to adopt the item.

NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF EAST PALO ALTO HEREBY:

1. Finds the foregoing recitals are true and correct, and are incorporated by this reference into this action;

2. Approve and adopt the 2025 Sewer System Master Plan, attached hereto as Exhibit A; and

3. Finds that the proposed action being considered by the City Council is exempt from the California Environmental Quality Act (CEQA) because it requires the implementation of management operations programs and plans to enhance and protect the environment by limiting the occurrence of SSOs in the City. (CEQA Guideline section 15308). Further, implementation of the proposed action may require the installation of minor sewer system facilities which will involve either minor alterations to existing facilities, or repair or replacement of existing facilities involving negligible or no expansion of sewer capacity, and as such, are exempt from review under CEQA Guidelines sections 15301 and 15302.
142
2 of 2
PASSED AND ADOPTED this 29th day of July 2025, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Martha Barragan, Mayor
ATTEST: APPROVED AS TO FORM:

James Colin, City Clerk John D. Lê, City Attorney
143

FINAL DRAFT
East Palo Alto Sanitary
District
Sewer System Master Plan
June 20, 2025
Prepared By

144
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. i Table of Contents
ES EXECUTIVE SUMMARY............................................................................................................................................1 ES.1 Background and Introduction.............................................................................................................................1 ES.2 Land Uses ..................................................................................................................................................................1 ES.3 Sanitary Sewer Flow and System Analysis....................................................................................................1 ES.4 Hydraulic Model Development........................................................................................................................3 ES.5 Hydraulic Capacity Analysis Results................................................................................................................3 ES.6 Pipeline Capacity and Condition Assessment............................................................................................ 4 ES.7 Capital Improvement Program........................................................................................................................ 4 ES.8 Rate and Impact Fee Study................................................................................................................................5 1 Background and Introduction .............................................................................................................................1-1

1.1 Background and Project Objectives .............................................................................................................1-1

1.2 Summary of Existing Information ...............................................................................................................1-2 2 Land Uses.................................................................................................................................................................. 2-1

2.1 Existing Sewer System .................................................................................................................................... 2-1

2.2 Population Served & Land Use Characteristics ...................................................................................... 2-1

2.3 Existing Collection System Facilities.......................................................................................................... 2-2 3 Sanitary Sewer Flow Analysis ............................................................................................................................3-1

3.1 Infiltration and Inflow.......................................................................................................................................3-1

3.2 Calculation of Flows..........................................................................................................................................3-1

3.3 Water Supply Service......................................................................................................................................3-2

3.4 Sewer System Treatment Capacity. ..........................................................................................................3-2 4 Hydraulic Model Development.........................................................................................................................4-1

4.1 Model Components..........................................................................................................................................4-1

4.2 Model Calibration...............................................................................................................................................4-1

4.3 Model Scenarios................................................................................................................................................4-2 5 System Capacity Analysis ...................................................................................................................................5-1

5.1 Design Storm Criteria.......................................................................................................................................5-1

5.2 Pipeline Hydraulic Capacity Criteria ............................................................................................................5-1

5.3 System Capacity Deficiencies......................................................................................................................5-2 6 Collection System Assessment ........................................................................................................................6-1 145
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. ii

6.1 Category 1: Existing Pipe Capacity Deficiencies ......................................................................................6-1

6.2 Category 2: Future Pipe Capacity Deficiencies .......................................................................................6-1

6.3 Category 3A: Existing Pipe Structural Deficiencies................................................................................6-1

6.4 Category 3B: Remaining Pipe in the Sewer System ............................................................................6-2 7 Capital Improvement Program ......................................................................................................................... 7-1

7.1 Capital Improvement Program Development........................................................................................ 7-1

7.1.1 Category 1 Existing Conditions CIP Project Group......................................................................... 7-1

7.1.2 Category 2: Developer Related CIP Project Group ...................................................................... 7-2

7.1.3 Category 3A: Existing Structural Deficiency CIP Project Group .............................................. 7-2

7.1.4 Category 3B: Aging Infrastructure CIP Project Group.................................................................. 7-2

7.1.5 Capital Improvement Projects – All Categories ............................................................................ 7-3 8 Rate and Impact Fee Study................................................................................................................................8-1 146
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. iii

LIST OF TABLES
Table ES.1 Pipeline Capacity and Condition Assessment
Table ES.2 CIP Project Summary
Table 3.1
Flow Monitoring Locations
Table 3.2 Peaking Factor Calculations
Table 4.1 Scenario 1: 2025 Flow Injection
Table 4.2 Scenario 2: 2035 Flow Injection
Table 4.3 Scenario 3: 2035 Enhanced Flow Injection
Table 6.1 2025 Capacity Improvements for 4-Feet Freeboard Under Existing PWWF Table 6.2
2035 Enhanced Capacity Improvements for 4-Feet Freeboard Under Existing PWWF Table 6.3 Structural Deficient Pipe Improvements
Table 7.1 Category 1 – CIP Project Summary
Table 7.2 Category 2 – CIP Project Summary
Table 7.3 Category 3A – CIP Project Summary
Table 7.4 Overall – Proposed Capital Improvement Plan
Table 7.5 Category 3B – CIP Project Summary
Table 8.1 Impact Fee Calculation
147
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. iv

LIST OF FIGURES
Figure ES.1 Existing Service Area
Figure 2.1 EPASD Sanitary Sewer Service Area
Figure 2.2 2025 Sewer Map
Figure 3.1 Flow Monitoring Locations
Figure 4.1 Scenario 1: 2025 – Additional Flow Injection Locations & Built Developments Figure 4.2 Scenario 2: 2035 Conditions – Additional Flow Injection Locations Figure 4.3 Scenario 3: 2035– Additional Flow Injection Locations & Known Developments Figure 5.1 Scenario 1: 2025 – PWWF Conditions
Figure 5.2 Scenario 2: 2035 – PWWF Conditions
Figure 5.3 Scenario 3: 2035 Enhanced PWWF Conditions
Figure 6.1 Category 1: Existing Pipe Capacity Deficiencies Figure 6.2 Category 2: Future Pipe Capacity Deficiencies Figure 6.3 Category 3A: Existing Pipe Structural Deficiencies Figure 6.4 Category 1, 2, and 3A Overlap
Figure 6.5 Category 3B: Remaining Pipe Sewer System
Figure 7.1 Category 1 – CIP Projects
Figure 7.2 Category 2 – CIP Projects
148
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. v Figure 7.3 Category 3A – CIP Projects
Figure 7.4 Overall – CIP Projects
149
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. vi

APPENDICES
Appendix A Land Use Changes – 2035 General Plan and Ravenswood Specific Plan Appendix B Sanitary Sewer Model Calibration Memorandum
Appendix C
Flow Demand Calculations
Appendix D Model Outputs and Results
Appendix E CIP Project Summary Sheets
Appendix F Impact Fee Memorandum
150
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. vii

ABBREVIATIONS
ADD Average Day Demand
ADWF Average Dry Weather Flow
CCTV Closed Circuit Television
City City of East Palo Alto
CIP Capital Improvement Project
EDUs Equivalent Dwelling Units
EPA Environmental Protection
Agency
EPASD East Palo Alto Sanitary District
FAR Floor Area Ratio
F&L Freyer & Laureta, Inc.
ft feet
FY fiscal year
GIS Geographical Information
System
GPD gallons per day
GPM gallons per minute
HDPE high density polyethylene
HGL hydraulic grade line
I&I Inflow and Infiltration
ISG Individual Supply Guarantee
LAFco Local Agency Formation
Commission
LF linear foot
MDD maximum day demand
MGD million gallons per day
O&M Operation & Maintenance
OPPC opinion of probable project cost
PDWF Peak Dry Weather Flow
PWWF Peak Wet Weather Flow
PHD peak hour demand
PVC polyvinyl chloride
RWQCP Regional Water Quality Control
Plant
SF square feet
SRF State Revolving Funds
SSOs Sanitary Sewer Overflows
VCP Vitrified Clay Pipe
WBSD West Bay Sanitary District
151
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. ES-1

ES EXECUTIVE SUMMARY
ES.1 Background and Introduction
The East Palo Alto Sanitation District (EPASD) was first established in 1939 in the southern corner of San Mateo County and borders Santa Clara County. Both the Cities of East Palo Alto portions of Menlo Park and are part of the EPASD’s service area.

The purpose of this Master Plan was to re-establish the EPASD model in new software, provide an updated Capital Improvement Program (CIP) along with a rate and impact fee. This Master Plan is an update to EPASD’s previously completed Master Plan in 2015 and its 2021 addendum.

ES.2 Land Uses
EPASD serves Cities of East Palo Alto and Menlo Park with a gravity-based sewer collection system covering approximately 1,230 acres (1.92 square miles) as shown in Figure ES.1. The system includes approximately 33 miles of sewer pipelines, primarily 6-inch vitrified clay pipes (VCP), with larger mains up to 30 inches in diameter. A major infrastructure component is the siphon under San Francisquito Creek, which was realigned in 2017 with two parallel 22-inch high-density polyethylene (HDPE) pipes.

Downstream of the syphon, sewer system is conveyed to the Palo Alto Regional Water Quality Control Plant (RWQCP) for treatment.

EPASD operates and maintains the collection system in accordance with the requirements of the State Water Resources Control Board, as administered through the Statewide SSO Waste Discharge Requirements and RWQCB Sewer System Management Plan guidelines.

The City of East Palo Alto’s 2035 General Plan, adopted in 2017, introduced land use changes to support balanced development across residential, commercial, and recreational uses. In 2024, the Ravenswood Specific Plan was adopted, which provided further refinement in the eastern portion of the city, enhancing details for mixed-use areas. These land use updates and other known developments were incorporated into system model. The land use maps are included in Appendix A.

ES.3 Sanitary Sewer Flow and System Analysis
Sewer flow estimates were derived using updated hydraulic modeling inputs, historic monitoring data, and land use assumptions. The methodology builds on the foundational work from the 2015 Master Plan and incorporates current Geographical Information System (GIS) data, flow monitoring studies, and zoning projections.

The flow projections for developments were calculated using a multi-step process based on billing records, zoning designations, and equivalent dwelling units (EDUs). Key elements of the process included:
• Estimating existing flows using 2019 billing data and a baseline of 200 gallons per EDU per day, consistent with WBSD practices.
152
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. ES-2 • Projecting future flows using zoning densities and Floor Area Ratios (FAR) from the 2035 General Plan and Ravenswood Specific Plan.
• Based on 2011-2012 Sanitary Sewer Flow Monitoring Inflow/Infiltration Study by V&A Consulting (V&A Flow Monitoring), the peaking factors were applied to calculate peak wet weather flows (PWWF) from average dry weather flows (ADWF).

Figure ES.1 Existing Service Area
153
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. ES-3 ES.4 Hydraulic Model Development
A hydraulic model was used to evaluate the current and future performance of the sewer system sewer system collection system. This model represents a tool used to support decision making for the ongoing improvement and maintenance of the system. The model incorporates physical and operational characteristics of the system and simulates key hydraulic parameters such as flow, velocity, depth, surcharge conditions, and hydraulic grade lines. The model was rebuilt from the outdated Hydra 7 platform to Bentley’s SewerGEMS software. The new model was developed using EPASD’s GIS database, archived field data, and updated infrastructure records. Validation against historical flow data confirmed the reliability of the SewerGEMS model, making it the analytical foundation for evaluating existing and future system capacity needs.

The three planning scenarios included the following:
• Scenario 1: 2025 Existing Conditions: The model was updated to reflect constructed developments and sewer improvements as of 2025. The projects included are Light Tree Apartments, University Plaza Phase 1, and 1950 Bay Road. The ADWF and PWWF were calculated and analyzed to assess the current system's capacity and identify deficiencies. • Scenario 2: 2035 Conditions: Scenario 2 will be described as 2035 Conditions, which include the land use changes from the 2035 General Plan and Ravenswood Specific Plan. • Scenario 3: 2035 Enhanced Conditions: Scenario 3 will be described as the 2035 Enhanced Conditions, which include the 2035 General Plan, Ravenswood Specific Plan, and Planned Developments. The planned developments include University Plaza Phase 2, Weeks Street Townhomes, and others.

This sanitary sewer system's performance was evaluated under wet weather conditions using a 10- year, 24-hour design storm, as defined by NOAA, to assess system capacity and predict sanitary sewer overflows (SSOs).

The 2025 Master Plan revises previous pipeline design criteria, replacing the depth-to-diameter (d/D) ratio with a freeboard-based standard. Under this updated criterion, all new or replacement pipelines are required to maintain a minimum of four feet of freeboard under design storm conditions. In instances where the pipe depth is less than four feet and the freeboard criterion cannot be applied, the system must demonstrate that no SSOs will occur under modeled conditions.

ES.5 Hydraulic Capacity Analysis Results
Hydraulic modeling was conducted for the three scenarios providing key insights into the current and future performance of the EPASD’s sanitary sewer system (Figures 5.1, 5.2, and 5.3). Based on the expected surcharge in current and future conditions, current and future capacity improvements are needed to accommodate peak wet weather flows.

Major observations within the model include:
154
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. ES-4 • Modeled 2025 current conditions do not predict SSOs and surcharging exists in some areas exceeding the design criteria.
• Modeled 2035 Conditions and 2035 Enhanced Conditions experience SSOs with surcharging in some areas exceeding the design criteria.
• There are both existing customer and developer-related capacity improvements required • The system has hydraulic limitations due to relatively flat existing topography, pipe slopes, and the absence of pump stations.
• Low flow velocities under both current and future dry weather conditions do not exceed 2 ft/s, which will require ongoing maintenance and monitoring.

ES.6 Pipeline Capacity and Condition Assessment
The recommended improvements for the sanitary sewer system have been grouped into four prioritybased categories. These categories address both existing and future deficiencies related to hydraulic capacity, structural condition, and system longevity. A summary of each category is provided below, and results are provided in Table ES.1 and mapping of categories 1-3 are presented in (Figure 6.1 through 6.5).

TABLE ES.1 PIPELINE CAPACITY AND CONDITION ASSESSMENT
Category Description Length (LF) Running Total
(LF)
Running Percentage of
Total System1
1 Existing Hydraulic Deficiencies 7,285 7,285 4.2%
2 Future Hydraulic Deficiencies213,848 21,133 12.2%
3A Structural Deficiencies 9,796 30,929 17.8%
3B Remaining System nearing end of
useful service life 142,928 173,857 100%

1. Total Pipe in System is 173,857 LF.
2, Excludes pipelines where developers and existing customers share responsibility.

Highlights: Category 1 and 3A deficiencies are grouped with the duties of current customers to fund improvements.

Category 2 Improvements are developer related improvements. Category 3B lines represent ongoing maintenance needs by all customers.

ES.7 Capital Improvement Program
The CIP was developed based on the deficiency category classifications. Categories 1 and 3A represent the most urgent needs due to existing hydraulic and structural deficiencies. Category 2 projects address future capacity needs related to anticipated development and should be reviewed regularly in coordination with the EPASD as growth occurs. Where practical, structurally deficient pipes from Category 3A were incorporated into Category 1 or 2 projects to maximize efficiency and reduce construction overlap.
155
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. ES-5 The CIP projects are broken down by Category, a summary can be seen in Table ES.2. Additional detail is found in Tables 7.1 through 7.5 mapped out in Figures 7.1 through 7.4. A breakdown of each CIP project is found in Appendix E.

The project estimates should be evaluated alongside other infrastructure capital planning efforts within the City.

TABLE ES.2 CIP PROJECT SUMMARY
Category Number of Projects Pipe Replacement (LF) OPPC ($) 1 2
1 7,501 $17,357,000
2 7
1, 2
17,000 $52,799,000
3A 4 6,429 $7,288,000

1. Portions of the project contain other category pipes to maximize construction efficiency. Work should be performed over the next 4 years funded by reserves and sewer service charges.

2. Principally developer-related projects.

3. The remaining portion of the sewer system 74% for existing VCP is suggested to be replaced over a 25-year period based on available funds. The OPPC for the remaining aging infrastructure will be approximately $4.3M/yr (6,000LF/yr), with an overall total of $107M. It is important to note that this cost is based on slip lining repair and partial replacement only.

ES.8 Rate and Impact Fee Study
As part of the EPASD’s Master Plan update, a sewer service charge has been developed to support funding maintenance of the existing system. This rate is presently set at $660, and the addition of an annual increase of 5% be applied to the fund the extensive deferred maintenance in the system.

Secondly, a revised impact fee has been developed to reflect newly identified CIP projects and current system capacity conditions. The proposed impact fee is $7,800 per EDU plus an annual 5% escalation, reduced from the previous fee of $10,621. The cost includes:
• Developer’s Share of Capacity Assurance: 25 percent of the costs are associated with existing capacity assurance improvements that will benefit future developments. • Developer’s Improvement: 100 percent of the costs related to future capacity deficiencies based on new development demands.
• Buy-In Treatment Cost: A buy-in cost of $5 million per 1.0 million gallons per day (MGD) of treatment capacity.
156
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 1-1 1 Background and Introduction

1.1 Background and Project Objectives
The East Palo Alto Sanitary District (EPASD) was established in 1939 in response to the growing development in the East Palo Alto area. It was created under the Sanitary District Act of 1923 (Health and Safety Code Section 6400 et seq.), which allowed for the formation of special districts to provide sewer system collection and treatment services. Initially, the district's sewer lines were built as part of a Works Progress Administration (WPA) project during the New Deal era. Construction of these facilities began after a treatment agreement was reached with the City of Palo Alto in 1940, and EPASD's infrastructure was officially operational on September 8, 1942.

EPASD serves a portion of the cities of East Palo Alto and Menlo Park, in San Mateo County, and its sewer system collection system directs sewage to the Palo Alto Regional Water Quality Control Plant for treatment. The district historically operated as an independent special district, meaning it is governed separately from city governments. A five-member elected Board of Directors oversees its policies, while employees carry out daily operations.

As of October 1, 2024, EPASD became a subsidiary district of the City of East Palo Alto (City). The establishment of EPASD as a subsidiary district to the City was approved by the San Mateo Local Agency Formation Commission (LAFCo) on November 23, 2023, and finalized on September 16, 2024.

LAFCo’s approval of the subsidiary district recognized the need for improved transparency in EPASD governance and sustainable and efficient operation of EPASD.

The EPASD system includes the operation and maintenance of over 33 miles of sewer pipelines, ensuring sewer system collection for thousands of residents in its service area. As a subsidiary district of the City, EPASD will continue to operate with the City Council as the Board of Directors and the City Manager as General Manager. The City has contracted with West Bay Sanitary District (WBSD) for the day-to-day operations of EPASD.

The previous EPASD Sewer Master Plan, completed in 2015 and updated via addendum in 2021, now requires a full update. As EPASD is currently a subsidiary district, the City is initiating a new Sewer Master Plan to support a comprehensive Capital Improvement Program (CIP), including a timeline for implementation. The Master Plan update will:
• Identify areas of needed improvement within the existing sewer system as of 2025. • Determine capacity upgrades required to serve future growth based on 2035 General Plan, the Ravenswood Specific Plan, and approved redevelopment projects. • Confirm pipeline renewal and replacement identified by EPASD’s prior condition assessment program.
• Develop potential CIP alternatives, including conceptual opinions of probable project cost and implementation timelines.
157
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 1-2

1.2 Summary of Existing Information
Existing documentation and data sources were thoroughly reviewed to support the development of the 2025 Master Plan. The reviewed materials provided critical background information and informed the development of key technical assumptions that served as the foundation for hydraulic modeling, capacity analysis, and the formulation of proposed capital improvement and operations plans.

Prior Studies, Documents, and Data
• EPASD Masterplan Update (March 2015)
• EPASD Masterplan Addendum (April 2021)
• 2011-2012 Sanitary Sewer Flow Monitoring Inflow/Infiltration Study by V&A (June 2012) • Vista 2035 East Palo Alto General Plan (October 2016) • Ravenswood Business District/Four Corners Specific Plan (November 2024) • Ravenswood/Four Corners Specific Plan Update SEIR – Appendix G Utility Impact Study (June 2024)
• Sanitary Sewer Capital Improvement and Operation Plan Development Memorandum by F&L (November 2022)
• CCTV Survey Results Evaluation and Pipeline Replacement Priorities Area 2, Trunk Line, and All Areas by Sierra West (October 2023)
• Project Completion Report Areas 1, 2, 3, 4, and Trunkline Sanitary Sewer Pipeline Closed Circuit Television Inspection Project by Sierra West (March 2023) • 2020 Urban Water Management Plan for City of East Palo Alto by EKI Environment & Water (June 2021)
• Records Review – Completed Construction Projects
o Sewer Trunkline Realignment (2016 CIP)
o Sanitary Sewer Replacement Project (2023 CIP)
o Pulgas Ave – Mixed Use Project (2014 Private Improvements) o Light Tree Sanitary Sewer Replacement Project (2021 Private Improvements) • Plan Review – Projects
o 2120-2160 Euclid Ave (Mixed Use)
o 2012-2043 Euclid Ave - Woodland Park Development (Housing) o 965 Weeks St - Colibri Commons (Housing)
o 1804 Bay Road Development (Housing)
o 2535 Pulgas Ave Development (Office)
158
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 2-1 2 Land Uses
Section 2 summarizes EPASD’s existing sewer system system, service area, and land use conditions.

The information was compiled through a review of previous studies, available documents, and data provided by EPASD.

2.1 Existing Sewer System
EPASD provides sewer system collection service to portions of the communities of Menlo Park and East Palo Alto, located in San Mateo County, within the San Francisco Bay Area. EPASD’s service area is primarily residential with a few commercial and industrial parcels.

As shown in Figure 2.1, EPASD service area encompasses nearly 1,230 acres or 1.92 square miles.

The collection system operates as a gravity sewer network, with approximately 61% of the existing pipelines consisting of 6-inch diameter lines. Larger collector lines range between 8-inch to 30-inches in diameter. The system includes a siphon beneath the San Francisquito Creek, which was realigned in 2017 with two parallel 22-inch high-density polyethylene (HDPE) pipes.

EPASD’s sewer system collection system consists of approximately 33 miles of gravity sewer pipelines. Historically, manholes were constructed using brick and mortar, and pipelines were constructed with vitrified clay pipe (VCP).

EPASD operates and maintains the collection system in accordance with the State Water Resources Control Board, under the Statewide SSO Waste Discharge Requirements and the RWQCB Sewer System Management Plan guidelines. The collected sewer system is conveyed to the Palo Alto RWQCP for treatment and ultimate discharge to the San Francisco Bay.

All known SSOs that have been reported were due to maintenance issues. WBSD is currently conducting ongoing system maintenance and inspection efforts.

2.2 Population Served & Land Use Characteristics
As a part of the 2015 Masterplan, land use information was compiled from multiple sources for the communities served by EPASD. The following data sources were used to characterize the population and land use within the service area:
• Land Use Database – Existing land use data in Geographical Information System (GIS) • General Plan Information – Additional land use data provided by the City • Aerial Photographs – Reviewed to identify parcels and land use characteristics within the service area.
159
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 2-2 In 2017, the City adopted the 2035 General Plan, which outlines the City’s vision for development and growth throughout the year 2035. The General plan includes a series of land use changes to balance the residential, commercial, and recreational spaces throughout the city.

The key changes within the 2035 General Plan include:
• Land use modifications occurred along University Avenue between Bay Road and Donohoe Street, as well as around the existing Target shopping center. • Residential zoning changes within the Ravenswood Business District were modified from lowdensity and commercial to high-density along Maple Street. • University Avenue west of Highway 101 include changes from commercial to office, mixed-use, and medium-density residential.

In 2024, the City adopted the Ravenswood Plan, which is the eastern portion of the city. The plan builds on the 2035 General Plan by providing a more detailed framework for future land use developments for the mixed-use areas within Ravenswood.

The land use changes in both the 2035 General Plan and Ravenswood Plan were incorporated into the 2025 Master Plan and the hydraulic model to reflect the anticipated future flows. The land use changes in both these plans are provided in Appendix A.

2.3 Existing Collection System Facilities
Since the completion of the 2015 Masterplan, EPASD has implemented several CIP projects to upgrade the existing sewer system. The upgrades to the system involve replacing the aging infrastructure with improved materials for both manholes and pipes. All new manholes were constructed with precast concrete, and new pipes were constructed with plastic pipe such as polyvinyl chloride (PVC) or HDPE.

The sewer system improvements completed since the 2021 Master Plan Addendum are illustrated in Figure 2.2. The improvements include 6,688 linear feet (LF) of newly installed sewer pipe.

The following is a summary list of the scope of work and highlight the improvements implemented across the two different projects.

1. Light Tree (2021)
As part of a private development project in 2021, the sewer infrastructure was improved on O’Connor Street, Pulgas Avenue, and Clarke Avenue. The project improvements included:
• Installing 9 new manholes.
• Reconstructing 1 manhole.
• Installed or replaced:
o 132 LF of 6-inch PVC.
o 76 LF of 10-inch PVC.
o 297 LF of 12-inch PVC.
o 1,310 LF of 16-inch PVC.
o 1,149 LF of 18-inch PVC.
160
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 2-3

2. Sanitary Sewer Replacement Project (2023)
As a part of the 2023 CIP project, multiple areas of EPASD sewer system were replaced/repaired. The projects occurred along Beech Street, Clarke Ave, Green Street, and O’Connor Street. The improvements included:
• Installing 7 new manholes.
• Rehabilitating 21 manholes.
• Installing or replacing:
o 764 LF of 30-inch PVC.
o 1,021 LF of 24-inch PVC.
o 1,323 LF of 20-inch PVC.
o 395 LF of 14-inch PVC.
o 486 LF of 18-inch PVC.
161
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 3-1 3 Sanitary Sewer Flow Analysis
Section 3 summarizes the background and methodology used to determine existing and future dry weather sewer system flows for input to EPASD’s collection system hydraulic model.

3.1 Infiltration and Inflow
V&A Flow Monitoring Report included a sanitary sewer flow monitoring inflow/infiltration (I&I) study in 2011-2012 for East Palo Alto. The study separated the service area into different flow monitoring sites, and the results were used to identify the average dry weather flow, peak dry weather flow, and peak wet weather flow. The flow monitoring locations are shown in Figure 3.1 with areas in Table 3.1.

The peaking factor results from the study are provided in Table 3.2.

3.2 Calculation of Flows
The V&A Flow Monitoring Report provided the data used to calculate sewer system flows for EPASD's existing hydraulic system. Based on three scenarios described later in later in this report, the following method was used to calculate the estimated additional sanitary sewer flows for each parcel. The calculated injection flows were inserted into the recalibrated 2014 Sewer Map in SewerGEMs that is further described in Section 4.

The calculation of flow injections uses a similar process as described in the 2021 Master Plan. As EPASD does not monitor flows from each individual parcel, a multiple-step process was followed to calculate the incremental additional flow by parcel. The major steps taken to estimate incremental additional flow by parcel are as follows:

1. Existing flow from each parcel was estimated and key aspects included:
a. The 2019 Tax Year Billing Charges were reviewed to identify the individual parcel billings.
b. Based on the individual billings, the Equivalent Dwelling Units (EDU) were calculated by dividing the parcel bill by $575 per EDU.
c. The calculated number of EDUs by parcel was then multiplied by 200 gallons per EDU to estimate the existing sanitary sewer flow from each parcel. This represents an update and decrease in flow per EDU, previously established at 240 gallons per EDU. This new value is in line with modern plumbing standards, other local water districts, and use of more water efficient products and landscaping trends.

2. Total flow from each parcel based on the 2035 General Plan and Ravenswood Plan’s revised zoning was then estimated:
a. The Maximum and Minimum Allowable Density and Floor to Area (FAR) ratio for each zoning category was identified in the 2035 General Plan and Ravenswood Plan. The land use characteristics for these calculations are included in Appendix A. 162
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 3-2 b. Using 50-percent of the range between maximum and minimum allowable density and FAR for each parcel, the estimated total sanitary sewer flow for non-residential was calculated using the unit flow rates from East Palo Alto Sanitary District Standard Specifications for Design and Construction of Sanitary Collection and Conveyance Facilities (Standard Specifications) report dated June 2002.

3. Lastly, total additional flow by parcel for both Average Dry Weather Flow (ADWF) and Peak Wet Weather Flow (PWWF) was calculated:
a. ADWF for existing conditions presented is subtracted from ADWF for future zoning changes based on each scenario.
b. PWWF was calculated by multiplying the ADWF for each parcel by the Sewer Basin PWWF Peaking Factor from Table 3.2. As there are no current-day studies for the I&I in the system, the peaking factor results from the V&A study were used to calculate the future PWWF flows.

3.3 Water Supply Service
As part of the verification of the predicted sewer model, F&L evaluated current drinking water imports into the service area. The City of EPA water supply is sourced from two primary channels: purchased water from San Francisco Public Utilities Commission (SFPUC) or groundwater extracted from wet wells. According to EPA’s Supply Assurance, SFPUC is required to provide an Individual Supply Guarantee (ISG) of 3.46 MGD of drinking water to the City. As detailed in Section 4.3, the projected 2035 Enhanced ADWF sewer flow for the future buildout is approximately 3.3 MGD. This indicates that the anticipated water supply exceeds the projected sewer demand, demonstrating sufficiency in meeting future needs.

3.4 Sewer System Treatment Capacity.

The Palo Alto Regional Water Quality Control Plant (RWQCP) records the total sewer system flow for EPASD and neighboring cities. The RWQCP is permitted to treat an average dry weather flow of 39 MGD. EPASD has an agreement with the RWQCP, where EPASD’s average annual flow capacity treatment allotment is 3.06 MGD, 7.64% of the RWQCP’s total capacity. 163
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 4-1 4 Hydraulic Model Development
Section 4 summarizes assumptions, items considered during model development and calibration, and key components of the completed hydraulic model. The hydraulic model was used to perform different scenarios to assess the impacts of future developments, land use changes, and any system configuration changes.

4.1 Model Components
The hydraulic model transforms information about the physical and operational characteristics of the sewer system into a mathematical model. The modeling results provide information on flows, flow depth, velocity, surcharge, and the hydraulic grade line, which were used to analyze system performance and identify system deficiencies. The model results were used to verify the adequacy of recommended or proposed system improvements.

The hydraulic model comprises a skeletonized network of nodes and conduits, which define the physical properties within EPASD’s system. The following descriptions provide information on elements used in the development of the hydraulic model. • Nodes: Nodes represent manholes and lamp holes. All flows added into the model are attached to node structures. The data required for node structures include pipe invert elevation, manhole rim elevation, and manhole diameter.
• Conduits: Conduits represent pipes that convey sewer system from one point in the system to another. The conduits include gravity pipes and siphons. The physical data for gravity pipes include pipe invert elevation, size, length, and friction factor.

4.2 Model Calibration
The 2025 Master Plan was constructed using EPASD’s GIS sewer system collection system, which includes information on the pipe material, pipe invert elevation, manhole rim elevations, pipe diameter, and pipe length. The GIS model was inserted into SewerGEMs.

As the previous sewer model developed using Hydra 7 software is outdated and no longer supported, the City approved transition to a modern platform that is better integrated with GIS. F&L rebuilt the EPASD sewer system model using SewerGEMS software using archived GIS data, databases, and field data, with a detailed ArcGIS sewer map being used as the foundation. SewerGEMS model results aligned with historical data, predicting flows, hydraulic grade lines, and surcharge locations. As the SewerGEMs model was validated, it serves as the basis for assessing system performance under current 2025 conditions and the 2035 future conditions to support updates to EPASD’s Master Plan. A detailed description of the methodology and results is provided in Appendix B. 164
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 4-2

4.3 Model Scenarios
Scenario 1: 2025 Conditions
The first step in analyzing the system was to update the GIS Sewer Map to reflect the current conditions of 2025. The map was updated for all sewer improvements found during the records review. The sewer system flows from the known developments built to date were calculated using the method discussed in Section 3.2. The known developments shown in Figure 4.1 include:
• 2485 Pulgas Avenue (Private Improvements)
• Light Tree Apartments
• Mid-Pen Housing (965 Weeks)
• University Plaza Phase 1
• 1950 Bay Road
The additional ADWF and PWWF by parcel are summarized in Table 4.1, with the total additional ADWF and PWWF presented at the bottom of the table. The additional ADWF is 92,574 GPD and the PWWF is 139,893 GPD. The total sewer flows for 2025 for ADWF is 1,586,080 GPD and PWWF is 5,880,153 GPD. The results from the 2025 conditions are used to assess any existing sewer capacity issues before additional development occurs within the EPASD boundaries. A detailed breakdown of the flow calculations is provided in Appendix C.

Scenario 2: 2035 Conditions
The next step in analyzing the system was to understand the capacity improvements that would be needed to serve new development based on the potential impact of the land use changes. The future conditions are described as the 2035 Conditions, which includes land use changes from the 2035 General Plan and Ravenswood Specific Plan.

Figure 4.2 shows the locations for the 2035 future flows to be injected into the model. The additional ADWF and PWWF by parcel are summarized in Table 4.2, with the total additional ADWF and PWWF presented at the bottom of the table. The additional ADWF is 1,472,639 GPD and the PWWF is 2,322,519 GPD. The total sewer flows for 2035 for ADWF is 2,966,145 GPD and for PWWF is 8,062,778 GPD.

A detailed breakdown of the flow calculations is provided in Appendix C.

Scenario 3: Enhanced Conditions
Once the additional flow based on the potential land use changes were inserted into the model, the next step was to update and analyze the system using known planned developments that were approved or in review by EPASD. The scenario represents the maximum buildout potential and is described as 2035 Enhanced Conditions, which include the 2035 General Plan, Ravenswood Specific Plan, and Planned Developments. The flows in these areas were recalculated based on the known and approved developments. The known developments shown in Figure 4.3 include:
165
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 4-3 • University Plaza Phase 2
• 2331 University Avenue
• Weeks Street Townhomes
• 2519 Pulgas Avenue
• 2535 Pulgas Avenue
• 1675 Bay Road
• 2001 Manhattan
• 2101 Runnymede
The additional ADWF and PWWF by parcel are summarized in Table 4.3, with the total additional ADWF and PWWF presented at the bottom of the table. The additional ADWF is 1,846,104 GPD and the PWWF is 2,903,896 GPD. The total sewer flows for 2035 for ADWF are 3,339,610 GPD and PWWF are 8,644,156 GPD. A detailed breakdown of the flow calculations is provided in Appendix C.

The projected ADWF under Scenario 2 and Scenario 3 is approximately 3.0 MGD and 3.3 MGD, respectively. These projections are consistent with the cumulative flow estimates presented in the Ravenswood/Four Corners Specific Plan Update SEIR – Appendix G Utility Impact Study (Utility Impact Study) prepared by Schaaf & Wheeler. The projected future cumulative demands—ranging from 3.0 to

3.3 MGD—fall within the Utility Impact Study’s estimated cumulative flow range of 3.13 to 3.33 million gallons per day (MGD).

As described earlier, EPASD’s allocated dry weather treatment capacity at the RWQCP is 3.06 MGD.

Although the projected cumulative flows slightly exceed this capacity, the planned capital improvements are expected to reduce I&I, thereby potentially mitigating peak flow impacts.

In order to ensure sufficient long-term treatment capacity, it is recommended that EPASD:
• Reestablish a collection system flow monitoring program similar to the sites presented in Table

3.1 and Figure 3.1. Continue monitoring system flows at the treatment plant as new development occurs.
• Reassess the effectiveness of I&I reduction measures following project implementation.

These actions will align system performance with treatment capacity limits and support EPASD's planning and regulatory compliance goals.
166
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 5-1 5 System Capacity Analysis
Section 5 evaluates EPASD’s sewer system collection system capacity constraints under flow conditions projected during EPASD’s design storm. This section summarizes the planning and capacity criteria, identifies predicted capacity limitations, and defines the methodology used to recommend appropriate solutions and strategies to address the identified issues.

5.1 Design Storm Criteria
Design storms are simulated rainfall events used to evaluate collection system capacity under wet weather flow conditions. A specific recurrence interval and rainfall duration define each design storm.

EPASD’s goal is to identify predicted SSOs that occur during the 10-year, 24-hour design storm.

The master plan evaluates the ability of the system to convey flows with surcharging under the selected design storm scenario. EPASD has selected as its design storm a rainfall event of 10-year recurrence intervals and 24-hour duration (10-year, 24-hour storm), as defined by the NOAA rainfall atlas.

5.2 Pipeline Hydraulic Capacity Criteria
Hydraulic capacity assessments were conducted to establish standards for identifying when pipes exceed EPASD’s acceptable surcharge limits. Under these criteria, a pipe may be considered theoretically capacity-deficient when, during PWWF conditions associated with the design storm, the water level or hydraulic grade line (HGL) rises above the top of the pipe.

While such conditions may not always result in an overflow, they indicate a potential deficiency in the pipe capacity. Exceptions to this criterion are made for siphons, which are designed to operate under surcharge conditions. All identified capacity-deficient pipelines are recommended for phased replacement, as outlined in Chapter 9, Capital Improvement Program.

In the 2015 Master Plan, pipeline capacity under projected development impacts was evaluated using the depth-to-diameter (d/D) ratio under peak dry weather flow (PDWF). This metric helped determine capital improvements needed to restore or maintain acceptable d/D values across the system. The 2025 Master Plan adopts a revised capacity deficiency criterion. The d/D method was replaced because it does not consider the effects of system aging, velocities, maintenance challenges, or non-uniform flow conditions.

In place, the revised criteria applies a freeboard-based standard that requires all pipes and manholes to maintain a minimum four-foot freeboard under design storm conditions. In areas where pipe depth is less than four feet and the freeboard criterion cannot be applied, an alternative criterion is used that no SSOs should occur under the modeled conditions.
167
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 5-2

5.3 System Capacity Deficiencies
To assess existing and future performance of EPASD’s sewer system, hydraulic modeling was conducted for three planning scenarios: 2025 Existing Conditions, 2035 Base Conditions, and 2035 Enhanced Conditions. These scenarios incorporated projected PWWF and were used to identify system deficiencies and capacity limitations.
• Scenario 1: 2025 Conditions
The 2025 Conditions were first analyzed in the model to understand the existing system deficiencies.

The PWWF discussed in Section 4.3 was add to the model. The results indicated no SSOs at any manholes; however, approximately 42,600 LF of pipeline were predicted to surcharge with less than four feet of freeboard. The results from the model are shown in Figure 5.1 and model results are provided in Appendix D.
• Scenario 2: 2035 Conditions
The next scenario that was analyzed in the model was 2035 Conditions. The PWWF flows discussed in Section 4.3 was added to the model. Under this scenario, SSOs were predicted at 22 manholes and approximately 97,600 LF of pipe segments were identified as surcharging with less than four feet of freeboard. The results from the model are shown in Figure 5.2 and model results are provided in Appendix D.
• Scenario 3: 2035 Enhanced Conditions
The final scenario evaluated incorporates 2035 Enhanced conditions, which account for planned developments and increased flow projections outlined in Section 4.3. The model predicted SSOs at 22 manholes with approximately 102,900 LF of surcharged pipe segments that do not provide four feet of freeboard. The results from the model are shown in Figure 5.3 and model results are provided in Appendix D.
168
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 6-1 6 Collection System Assessment
The purpose of this section is to present an evaluation of the pipeline condition based on capacity and structural deficiencies throughout the collection system. Based on hydraulic modeling and condition assessment data, a set of recommended strategies has been developed to address identified system deficiencies. These recommendations are categorized into four groups based on the type of deficiency, each addressed in a dedicated subsection:
• Category 1: Existing Pipe Capacity Deficiencies
• Category 2: Future Pipe Capacity Deficiencies
• Category 3A: Pipe Structural Deficiencies
• Category 3B: Remaining Pipe in the Sewer System

6.1 Category 1: Existing Pipe Capacity Deficiencies
Category 1 addresses current hydraulic capacity deficiencies that exist under present-day flow conditions. As described in Section 5, the hydraulic modeling identified segments that fail to meet the minimum four-foot freeboard criteria for surcharging under PWWF.

To address the current deficiencies within the system, approximately 7,285 LF of pipe will require upsizing. The improvements not only improve deficiencies within the pipeline section itself but also reduce the HGL on upstream lines. The overall benefit of improving only 7,285 LF of pipe will bring approximately 21,058 LF of pipeline in compliance with the design criteria. Although there are remaining pipes that do not meet the design criteria, the pipes do not cause any concern of SSOs within the system.

The Category 1 projects will provide the hydraulic capacity and improve the operations of the presentday system. Figure 6.1 illustrates the locations and proposed diameter increases for each of the deficient pipes. Table 6.1 lists all the pipe segments identified and the proposed size.

6.2 Category 2: Future Pipe Capacity Deficiencies
Category 2 focuses on addressing projected capacity constraints driven by future growth and development. The analysis was conducted using the 2035 Enhanced scenario, which incorporates flows from planned and approved development flows.

Category 2 projects will provide hydraulic capacity for approximately 13,848 LF of pipe must be upsized under PPWF. Figure 6.2 illustrates the locations, and proposed diameter increases for each of the deficient pipes. Table 6.2 lists all the pipe segments identified and the proposed size.

6.3 Category 3A: Existing Pipe Structural Deficiencies
Category 3A addresses the physical structural defects in the system identified through closed-circuit television (CCTV). Structural deterioration, such as cracking, deformation, joint separation, and root intrusion, can lead to failures within the system and affect the operations. The pipes within this 169
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 6-2 category were identified within the CCTV Survey Results Evaluation and Pipeline Replacement Priorities Area 2, Trunk Line, and All Areas by Sierra West as high-priority pipes to be replaced.

WBSD is currently performing ongoing sewer system maintenance assessments through cleaning and CCTV inspections. As of the date of this report, approximately three miles of pipe have been assessed.

Once WBSD field investigation is completed, the proposed improvements should be evaluated for inclusion in the annual improvement budget for aging infrastructure.

Category 3A projects will provide improved resilience for approximately 9,796 LF of pipe was identified as structurally deficient and prioritized for replacement. Figure 6.3 illustrates the location of the highpriority structural, same size replacement segments. Table 6.3 lists all the pipe segments identified and the proposed size.

However, approximately 5,166 LF of pipes overlap with either Category 1 or Category 2 for hydraulic capacity. Figure 6.4 illustrates the location of the pipes with both a high-priority structural deficiency and hydraulic capacity deficiency for improvements.

6.4 Category 3B: Remaining Pipe in the Sewer System
Category 3B addresses the remaining pipes within the collection system that have not been determined to either be capacity deficient or structurally deficient. Most of the existing collection system pipe segments are nearing or exceeding their anticipated service life, typically 50 to 75 years for vitrified clay pipes.

The total remaining length of pipe recommended for phased replacement from VCP to HDPE is approximately 73% of the existing system. Figure 6.5 illustrates the remaining system segments slated for replacement.
170
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 7-1 7 Capital Improvement Program
Section 7 summarizes the Capital Improvement Program (CIP) projects, based on the categories discussed in Section 6 – Collection System Assessment. The CIP methodology was developed to establish a prioritized timeline for each project and provide an associated Conceptual Opinion of Probable Project Cost (OPPC).

7.1 Capital Improvement Program Development
Based on the classifications outlined in Section 6, a comprehensive evaluation of system improvements was conducted. All CIP project OPPC were developed at a planning level in 2025 dollars. The OPPCs include allowances for additional project components necessary for implementation, as shown below:
• Construction Contingency: 30%
• Design: 10%
• Environmental/Permitting: 10%
• Construction Management and Inspections: 15%
• District Administration: 5%
The cost factors listed above were applied uniformly across all categories to provide a consistent and comprehensive planning-level OPPC.

CIP projects were developed and grouped primarily with their improvement category. However, in several cases, the more than one category pipeline will be addressed by projects due to overlap or immediate proximity. Below is a summary of the project Groups

7.1.1 Category 1 Existing Conditions CIP Project Group
Category 1 CIP projects address existing capacity constraints and were divided into two separate project areas. Locations and project extents are illustrated in Figure 7.1. Taking advantage of project proximity, some additional Category 3A pipes improvements were also added into this CIP group.

The two projects, designated as CIP 1.1 and CIP 1.2, are both scheduled to initiate the design phase during the 2025–2026 fiscal year. CIP 1.1 is anticipated to begin construction in the 2026–2027 fiscal year. Due to the need for additional environmental permitting and coordination with PG&E, the design phase for CIP 1.2 is expected to span two fiscal years, from 2025 to 2027. Construction for CIP 1.2 is scheduled to commence in the 2027–2028 fiscal year and is projected to be completed in the 2028– 2029 fiscal year.

The total estimated cost for the Category 1 CIP projects is approximately $17.4 million. The project summary OPPC breakdown is presented in Table 7.1. These projects are funded by the existing customer base. The detailed breakdown of the OPPC is included in Appendix E. 171
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 7-2

7.1.2 Category 2: Developer Related CIP Project Group
Category 2 CIP projects address anticipated capacity deficiencies associated with future development and were divided into seven distinct project areas, as shown in Figure 7.2. Similar to the Category 1 CIP group, portions of Categories 2 and 3 deficient pipes overlap. The capacity expansion of Category 2 deficient pipes within this CIP group remains developer-related, as increasing their size would not be required by the existing customer base. Taking advantage of project proximity, small portions of both Category 1 and 3 deficient pipes were also added to this Category 2 CIP group. Approximately 93% of the Category 2 CIP projects are directly developer-related.

The specific impacts and any associated fees for each project will be evaluated on a case-by-case basis.

Developers may be responsible for preparing the design and performing the construction work under the supervision of the District. In certain instances, developers may be permitted to provide design and construction services as in-kind contributions, which may be credited toward their financial obligations to the District.

Due to the dependence on future development, the implementation schedule for Category 2 CIP projects should remain flexible and be reviewed regularly in coordination with EPASD. A sewer monitoring program is recommended as well to support project prioritization. If anticipated developments are delayed or not constructed, related structural improvements incorporated may require reclassification as higher-priority projects.

The total estimated cost for developer-related and adjacent deficient pipe CIP projects is approximately $52.8 million. The project summary OPPC breakdown is presented in Table 7.2. The detailed breakdown of the OPPC is included in Appendix E.

7.1.3 Category 3A: Existing Structural Deficiency CIP Project Group Category 3A CIP projects address structural defects identified through CCTV inspections and were divided into four project areas. The projects were divided to be approximately $2 million over the next five years. Project locations are shown in Figure 7.3.

The total estimated cost for remaining structural deficiency CIP projects not covered in the other groups is approximately $7.3 million. The project summary OPPC breakdown is presented in Table 7.3.

These projects are funded by the existing customer base. The detailed breakdown of the OPPC is included in Appendix E.

7.1.4 Category 3B: Aging Infrastructure CIP Project Group Category 3B encompasses the remaining sewer system assets not currently identified as hydraulically or structurally deficient but nearing the end of their expected service life. These pipes are recommended for phased replacement over a 25-year period to maintain system integrity and service reliability. The OPPC for the remaining aging infrastructure CIP projects not covered in the other groups will be approximately $4.3 million per year, with an overall total of $107 million. The cost is based on slip lining and replacement hybrid concept approach. The cost is not reflective of the complete trenching and replacement of the sewer system, which would require additional analysis. The project 172
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 7-3 summary OPPC is presented in Table 7.5. Fund sources evaluation is recommended to support aging infrastructure improvements, such as the California Clean Water State Revolving Funds (SRF) funded by the Environmental Protection Agency (EPA).

7.1.5 Capital Improvement Projects – All Categories
A consolidated summary of all proposed CIP projects is presented in Table 7.4, including brief descriptions, cost estimates, and recommended implementation priority. The combined geographic distribution of these projects is illustrated in Figure 7.4. Detailed project summary sheets are provided in Appendix E, which include the scope of work and estimated OPPC values.

An annual budget of $2 million per year is recommended for Category 3B projects to replace the existing aging infrastructure. The phasing and prioritization should be determined through the following methods:
• Yearly maintenance inspections,
• Flow monitoring, and
• Available funding.
173
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers. 8-1 8 Rate and Impact Fee Study
Section 7 describes the methodology and summarizes the analysis that was used to determine the impact fee for future customers.

As part of the ongoing development of the Master Plan and identification of new CIP projects, EPASD intends to update its impact fee to accurately reflect the costs associated with planned system improvements and infrastructure expansion. The estimated impact fee based on the necessary CIP for the Category 2 project is $7,800 per EDU with an annual escalation. The calculation for the impact fee is presented in Table 8.1.

This fee has been calculated based on the following cost components, with a comprehensive summary included in Appendix F:
• Developer’s share of existing capacity assurance: 25 percent of the costs are associated with existing capacity assurance improvements. These improvements are anticipated to provide capacity benefits for future growth. The developer-associated cost was determined through a flow-based analysis. It evaluated the projected increase in sewer system flow contributed by new development relative to total system demand.
• Developer’s Improvement: 100 percent of the costs related to capacity deficiencies that are directly attributable to new development demands.
• Buy-In Treatment Cost: A buy-in cost of $5 million per 1.0 million gallons per day (MGD) of treatment capacity, representing the proportional reimbursement by developers for the available capacity at the PAWRQCP.
174
Monitoring
Site (1) Location Basin Size (Acres)
A15 Bay Road, east of Demeter St. 118
B13 Intersection of Bay Rd and Poplar Ave 87
E1 Intersection of Cooley Ave and Green St. 101
E2 Cooley Ave, north of Donohoe St. 149
H3 Intersection of Clarke Ave and Beech St. 74
I3 East end of Beech St. 74
I12 Pulgas Ave, north of Sage St. 135
K4 Intersection O'Connor St and Larkspur Dr. 107
K28 Larkspur Dr, south of O'Connor St. 95
T20 75 feet east of end of Cypress St. 171
T13 Along north edge of Palo Alto Municipal Golf Course. 1,230 Notes
(1) Monitoring sites are identified in Table 3 of the East Palo Alto Sanitary District Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study dated June 2012 prepared by V&A Consulting Engineers, Inc., referred to herein as "Flow Monitoring Study."
Table 3.1
Flow Monitoring Locations
2025 Sewer System Master Plan
EPA Master Plan Tables - Flow Calculations.xlsx Page 1 of 1 Freyer & Laureta, Inc.

Last Printed: 6/18/2025 175
Monitoring
Site
ADWF
(MGD)
PDWF
(MGD)
PWWF
(MGD)
PDWF
Peaking
Factor
PWWF
Peaking
Factor
(1) (2) (3) (4) (5) (6)
A15 0.27 0.43 1.19 1.59 2.77
B13 0.06 0.11 0.52 1.83 4.73
E1 0.13 0.19 0.59 1.46 3.11
E2 0.25 0.43 1.45 1.72 3.37
H3 0.14 0.23 0.58 1.64 2.52
I3 0.83 1.22 2.76 1.47 2.26
I12 0.23 0.39 0.76 1.70 1.95
K4 0.22 0.35 0.99 1.59 2.83
K28 0.11 0.17 0.68 1.55 4.00
T20 0.40 0.60 1.55 1.50 2.58
T13 1.53 2.31 5.78 1.51 2.50
Notes
(1) Monitoring sites are identified in Table 3 of the East Palo Alto Sanitary District Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study dated June 2012 prepared by V&A Consulting Engineers, Inc., referred to herein as "Flow Monitoring Study."
(2) ADWF is presented in Table 5 of the Flow Monitoring Study (3) PDWF is presented in Table 7-3 of the East Palo Alto Sanitary District Wastewater Collection System Master Plan Update dated March 2015 prepared by Freyer & Laureta, Inc., herein referred to as "Master Plan Update."
(4) PWWF is presented in Table 7-3 of the Master Plan Update. (5) PDWF Peaking Factor is calculated by dividing the PDWF by the Overall ADWF.
(6) PWWF Peaking Factor is calculated by dividing the PWWF by the PDWF.

Abbreviations
ADWF: Average Dry Weather Flow PDWF: Peak Dry Weather Flow MGD: Million Gallons per Day PWWF: Peak Wet Weather Flow Table 3.2
Peaking Factor Calculations
2025 Sewer System Master Plan
EPA Master Plan Tables - Flow Calculations.xlsx Page 1 of 1 Freyer & Laureta, Inc.

Last Printed: 6/18/2025 176
Injection
Manhole Total ADWF, CFS Total PWWF, CFS
A16 0.0310 0.0465
A34 0.0027 0.0040
A36 0.0028 0.0042
A38 0.0018 0.0028
A41 0.0009 0.0014
A42 0.0018 0.0028
A43 0.0006 0.0009
A45 0.0009 0.0014
A46 0.0043 0.0065
F8 0.0419 0.0628
D1 0.0256 0.0374
M32 0.0280 0.0446
Total, CFS 0.14 0.22
Total, MGD 0.09 0.14
Abbreviations
ADWF: Average Dry Weather Flow
PWWF: Peak Wet Weather Flow
CFS: Cubic Feet per Second
MGD: Million Gallons per Day
Table 4.1
Scenario 1: 2025 Flow Injections
2025 Sewer System Master Plan
EPA Master Plan Tables - Flow Calculations.xlsx Page 1 of 1 Freyer & Laureta, Inc.

Last Printed: 6/18/2025 177
Injection Manhole Total ADWF, CFS Total PWWF, CFS
A10 0.0167 0.0267
A11 0.0145 0.0230
A12 0.0098 0.0151
A13 0.0034 0.0051
A14 0.0630 0.1000
A15 0.0068 0.0102
A16 0.0385 0.0577
A17 0.0032 0.0048
A2 0.0050 0.0079
A18 0.0191 0.0286
A19 0.0179 0.0268
A20 0.0180 0.0271
A21 0.0317 0.0475
A23 0.0127 0.0190
A24 0.0045 0.0068
A25 0.0153 0.0229
A26 0.0196 0.0295
A27 0.0353 0.0530
A28 0.0259 0.0388
A30 0.1886 0.2830
A31 0.0027 0.0041
A34 0.0014 0.0021
A36 0.0019 0.0028
A38 0.0012 0.0018
A41 0.0024 0.0036
A42 0.0012 0.0018
A43 0.0003 0.0005
A45 0.0006 0.0009
A46 0.0026 0.0039
A5 0.0219 0.0349
A8 0.0223 0.0356
B2 0.0081 0.0129
B3 0.0307 0.0490
B4 0.1638 0.2612
B40 0.0472 0.0752
C16 0.0054 0.0100
D1 0.0489 0.0842
D5 0.0126 0.0216
D17 0.0657 0.1131
D22 0.0629 0.1082
D73 0.0145 0.0249
D74 0.0232 0.0399
D8 0.0061 0.0105
E1 0.0004 0.0006
E20 0.0340 0.0497
E22 0.0373 0.0546
E25 0.0581 0.0849
E30 0.0046 0.0067
E45 0.1006 0.1471
Table 4.2
Scenario 2: 2035 Flow Injections
2025 Sewer System Master Plan
EPA Master Plan Tables - Flow Calculations.xlsx Page 1 of 2 Freyer & Laureta, Inc.

Last Printed: 6/18/2025 178
Injection Manhole Total ADWF, CFS Total PWWF, CFS
Table 4.2
Scenario 2: 2035 Flow Injections
2025 Sewer System Master Plan
E47 0.0330 0.0483
F11 0.0252 0.0377
F14 0.0115 0.0172
F15 0.0085 0.0127
F20 0.0127 0.0190
F7 0.0102 0.0153
F8 0.0915 0.1373
G14 0.0056 0.0083
G17 0.0056 0.0083
G19 0.0023 0.0034
G2 0.0054 0.0081
G20 0.0006 0.0010
G21 0.0006 0.0009
G22 0.0006 0.0010
H24 0.0326 0.0479
H32 0.0098 0.0161
H33 0.0073 0.0117
H36 0.0637 0.1046
H37 0.0161 0.0264
H42 0.0047 0.0078
H44 0.0017 0.0027
M32 0.0481 0.0765
M38 0.3439 0.5832
N8 0.0711 0.1105
O16 0.0123 0.0208
O27 0.0006 0.0009
O3 0.0064 0.0102
O51 0.0110 0.0186
O58 0.0055 0.0093
T23 0.0072 0.0107
T25 0.0441 0.0661
T28 0.0363 0.0545
Total, CFS 2.27 3.58
Total, MGD 1.47 2.32
Abbreviations
ADWF: Average Dry Weather Flow
PWWF: Peak Wet Weather Flow
CFS: Cubic Feet per Second
MGD: Million Gallons per Day
EPA Master Plan Tables - Flow Calculations.xlsx Page 2 of 2 Freyer & Laureta, Inc.

Last Printed: 6/18/2025 179
Injection Manhole Total ADWF, CFS Total PWWF, CFS
A10 0.0196 0.0312
A11 0.0148 0.0236
A12 0.0109 0.0169
A13 0.0034 0.0051
A14 0.0634 0.1006
A15 0.0075 0.0113
A16 0.0425 0.0638
A17 0.0032 0.0048
A18 0.0198 0.0297
A19 0.0193 0.0290
A2 0.0226 0.0361
A20 0.0184 0.0276
A21 0.0324 0.0486
A23 0.0127 0.0190
A24 0.0056 0.0084
A25 0.0153 0.0229
A26 0.0196 0.0295
A27 0.0353 0.0530
A28 0.0259 0.0388
A30 0.1901 0.2852
A31 0.0037 0.0056
A34 0.0022 0.0032
A36 0.0031 0.0046
A38 0.0018 0.0028
A41 0.0028 0.0043
A42 0.0018 0.0028
A43 0.0006 0.0009
A45 0.0009 0.0014
A46 0.0043 0.0065
A5 0.0223 0.0355
A8 0.0238 0.0379
B2 0.0427 0.0680
B3 0.0455 0.0724
B4 0.2009 0.3204
B40 0.0476 0.0758
C16 0.0076 0.0140
D1 0.0526 0.0830
D5 0.0140 0.0242
D17 0.0736 0.1265
D22 0.1865 0.3208
D73 0.0215 0.0369
D74 0.0437 0.0712
D8 0.0065 0.0112
E1 0.0008 0.0011
E20 0.0444 0.0650
E22 0.0412 0.0603
E25 0.1659 0.2424
E30 0.0068 0.0100
E45 0.1122 0.1640
Table 4.3
Scenario 3: 2035 Enhanced Flow Injections
2025 Sewer System Master Plan
EPA Master Plan Tables - Flow Calculations.xlsx Page 1 of 2 Freyer & Laureta, Inc.

Last Printed: 6/18/2025 180
Injection Manhole Total ADWF, CFS Total PWWF, CFS
Table 4.3
Scenario 3: 2035 Enhanced Flow Injections
2025 Sewer System Master Plan
E47 0.0393 0.0574
F11 0.0344 0.0515
F14 0.0118 0.0178
F15 0.0129 0.0193
F20 0.0172 0.0258
F7 0.0132 0.0192
F8 0.1002 0.1502
G14 0.0059 0.0089
G17 0.0059 0.0089
G19 0.0030 0.0045
G2 0.0062 0.0093
G20 0.0010 0.0015
G21 0.0010 0.0015
G22 0.0010 0.0015
H24 0.0513 0.0757
H32 0.0333 0.0547
H33 0.0073 0.0117
H36 0.0772 0.1268
H37 0.0182 0.0299
H42 0.0082 0.0135
H44 0.0024 0.0039
M32 0.0481 0.0765
M38 0.3657 0.6079
N8 0.0734 0.1153
O16 0.0156 0.0265
O27 0.0016 0.0026
O3 0.0082 0.0131
O51 0.0136 0.0230
O58 0.0132 0.0224
T23 0.0083 0.0124
T25 0.0444 0.0667
T28 0.0363 0.0545
Total, CFS 2.84 4.47
Total, MGD 1.85 2.90
Abbreviations
ADWF: Average Dry Weather Flow
PWWF: Peak Wet Weather Flow
CFS: Cubic Feet per Second
MGD: Million Gallons per Day
EPA Master Plan Tables - Flow Calculations.xlsx Page 2 of 2 Freyer & Laureta, Inc.

Last Printed: 6/18/2025 181
Table 6.1
2025 Capacity Improvements for Existing Hydraulic Deficiencies Under PWWF 2025 Sewer System Master Plan
East Palo Alto, California
Segment Length (Feet) Existing Diameter
(Inches)
Proposed Diameter
(Inches)
B15+B49 331 8 12
B16+B15 327 8 12
B19+B12 500 6 10
B49+B14 328 8 12
C1+B16 402 8 12
C2+C1 204 8 10
C3+C2 398 6 10
C4+C3 436 6 10
C5+C4 328 6 10
C6+C5 87 6 10
C12+C1 265 6 10
D7+D6 398 6 10
H34+H17 269 6 10
H35+H34 322 6 10
H36+H35 474 6 10
I4+I3 243 18 30
K28+K4 242 10 16
L1+L21 223 10 16
L21+K28 68 10 16
T17+T34 407 21 30
T18+T17 540 21 30
T36+T18 494 21 30
Total 7,285
Abbreviations
PWWF: Peak Wet Weather Flow
EPA Master Plan Tables - CIP Project Breakdown 5.6.2025.xlsx Page 1 of 1 Freyer & Laureta, Inc.

Last Printed: 6/18/2025 182
Table 6.2
2035 Enhanced Capacity Improvements for Future Hydraulic Deficiencies Under PWWF 2025 Sewer System Master Plan
East Palo Alto, California
Segment Length (Feet)
Existing Diameter
(Inches)
Proposed Diameter
(Inches)
A9+A10 181 15 24
A10+A15 299 15 24
A15+A16 435 15 24
A16+A21 296 15 24
A21+A23 155 15 24
A23+A22 14 15 24
A22+A29 369 18 24
A29+T29 345 18 30
B37+B6 262 6 10
D1+E4 354 12 24
D21+D19 391 8 12
D22+D21 149 8 12
E2+E1 283 12 24
E3+E2 280 12 24
E4+E3 357 12 24
F7+T25 477 6 10
F8+F7 357 6 10
F23+F8 327 6 10
H12+H11 333 8 12
H13+H12 108 8 12
H14+H13 446 8 12
H15+H62 201 8 12
H16+H60 351 8 12
H17+H57 397 8 12
H57+H16 40 8 12
H60+H15 99 8 12
H62+H14 233 8 12
I5+I31 135 18 30
I6+I5 411 18 30
I31+I4 321 18 30
I37+I6 48 15 30
M2+M44 42 8 12
M3+M2 380 8 12
M31+M3 357 8 12
M44+I15 62 12 12
T11+T10 326 24 24
T12+T11 482 24 24
T19+T36 6 24 30
EPA Master Plan Tables - CIP Project Breakdown 5.6.2025.xlsx Page 1 of 2 Freyer & Laureta, Inc.

Last Printed: 6/18/2025 183
Table 6.2
2035 Enhanced Capacity Improvements for Future Hydraulic Deficiencies Under PWWF 2025 Sewer System Master Plan
East Palo Alto, California
Segment Length (Feet)
Existing Diameter
(Inches)
Proposed Diameter
(Inches)
T20+T19 332 18 30
T21+T20 338 21 30
T22+T37 191 21 30
T23+T22 373 18 30
T24+T23 317 18 30
T25+T24 282 18 30
T26+T25 306 18 30
T27+T26 356 18 30
T28+T27 162 18 30
T29+T28 234 18 30
T30+T12 285 24 24
T31+T30 351 24.2 24
T32+T31 125 24.2 24
T37+T21 83 21 30
Total 13,848
Abbreviations
PWWF: Peak Wet Weather Flow
EPA Master Plan Tables - CIP Project Breakdown 5.6.2025.xlsx Page 2 of 2 Freyer & Laureta, Inc.

Last Printed: 6/18/2025 184
Table 6.3
Structural Deficient Pipe Improvements
2025 Sewer System Master Plan
East Palo Alto, California
Segment Length (Feet)
Existing Diameter
(Inches)
Proposed Diameter
(Inches)
K19+K18 272 6 8
L2+L1 179 10 12
O4+O3 277 8 10
O20+O19 116 6 8
O21+O19 394 6 8
J7+J6 441 6 8
J9+J8 401 6 8
A1+A2 80 12 16
A2+A5 244 12 16
A5+A8 124 15 18
A18+A16 442 6 8
B5+B52 176 12 16
B6+B5 158 12 16
B12+B11 277 10 12
B17+B13 501 6 8
B27+B25 318 6 8
B31+B29 257 6 8
B32+B31 254 6 8
H20+H19 271 6 8
E20+E7 504 6 8
E30+E29 502 6 8
E33+E29 455 6 8
E36+E15 420 6 8
E46+E7 501 6 8
C40+C36 257 6 8
C41+C40 191 6 8
D10+D3 489 10 12
D25+D24 301 6 8
D51+D7 458 6 8
F12+F11 355 6 8
B2+A1 181 12 16
Total 9,796
EPA Master Plan Tables - CIP Project Breakdown 5.6.2025.xlsx Page 1 of 1 Freyer & Laureta, Inc.

Last Printed: 6/18/2025 185
Project # Improvement Description Proposed Pipe Sizes
Approximate
Length of Pipe
(LF)
Projected
OPPC ($) Notes

1.1 (2)
Pipeline Replacement on Menalto
Avenue, Poplar Avenue, Bay Road, and
Elliot Drive
8-inch, 10-inch, 12-
inch HDPE DR 17 4,833 6,042,000$
Projects will need Encroachmen Permit with
City of Menlo Park. Project will involve
crossing Bayshore Freeway.

1.2 Pipeline Replacement on Trunk Line in
Creek, Beech Street, Larkspur Drive,
and Gardenia Ave
8-inch, 12-inch, 16-
inch, 30-inch HDPE
DR 17
2,668 11,315,000$
Environmental Permits will be required.

Trunk Line improvements are located on
Creek. Coordination will be required for
PG&E gas line.

Total 7,501 $ 17,357,000
Notes(1) See Figure 7.1 for limits of improvements.(2) Projects include Category 3 pipes that overlap with Category 1 deficiencies. AbbreviationsCIP: Capital Improvement ProgramDR: dimension rationHDPE: high density polyethyleneLF: linear feetOPPC: opinion of probable project cost Table 7.1
Category 1 - CIP Project Summary
2025 Sewer System Master Plan
East Palo Alto, California
EPA Master Plan Tables - CIP Project Breakdown 5.6.2025.xlsx Page 1 of 1 Freyer & Laureta, Inc.

Last Printed: 6/18/2025
186
Project # Improvement Description Proposed Pipe Sizes Proposed Development (If applicable) Project Priority Approximate Length of Pipe (LF) Projected OPPC ($) Notes

2.1 Pipeline Replacement on Bayshore Road,
Donohoe Street, Cooley Ave, and O'Connor
Street
8-inch, 10-inch, 12-inch, 24-inch HDPE
DR 17
Woodland Parks (2001 Manhattan) & 2120-60
Euclid Avenue See Note 2 3,460 7,466,000$
Project will involve crossing Bayshore
Freeway. Project should be continued to be
re-evaluated as structural deficiencies may
be moved to a higher priority project if
proposed development projects are not
constructed soon.

2.2 Pipeline Replacement on University Avenue,
Runnymede Street, Clarke Avenue, and Beech
Street
10-inch, 12-inch HDPE DR 17 Woodland Parks (2001 Manhattan) & 2120-60 Euclid Avenue See Note 2 4,188 9,795,000$ Project will include coordination with PG&E on gas line on Beech Street.

2.3 Pipeline Replacement on Trunk Line in Creek 30-inch HDPE DR 17 Ravenswood Area See Note 2 2,981 17,635,000$ Environmental Permits will be required.

Trunk Line improvements are located on
Creek.

2.4 Pipeline Replacement on Bay Road and Pulgas
Avenue
8-inch, 10-inch, 24-inch, 30-inch HDPE
DR 17
2485 Pulgas Avenue (3)
2535 Pulgas Ave (Office) 2519 Pulgas Ave (Office)
1804 Bay Road1675 Bay Road
See Note 2 2,799 9,293,000$
Project should be continued to be reevaluated as structural deficiencies may be moved to a higher priority project if
proposed development projects are not
constructed soon.

2.5 Pipeline Replacement on Maple Lane 10-inch HDPE DR 17 Mid-Pen Housing (965 Weeks Street) (3) See Note 2 1,161 1,401,000$ 2.6 Pipeline Replacement on O'Connor Street.

Project will also include 11 Smart Cover Meters to be installed similar to the subbasin locations notated in V&A Flow Monitoring Study.
12-inchHDPE DR 17 Light Tree Apartments (East Bayshore Road) (3) See Note 2 841 1,377,000$ Project will require coordination for two 24-
inch PG&E Gas Main Transmissions. Project
will also reinstate City's Flow Monitoring
Program.

2.7 New Parallel Trunk Line within San Francisquito Creek on Palo Alto Golf Course 24-inch HDPE DR 17 Ravenswood Area See Note 2 1,569 5,832,000$ Project should be re-evaluated on a yearly basis. As project scope on developments may be reduced/removed.

Total 17,000 52,799,000$
Notes
(1) See Figure 7.2 for limits of improvements.(2) Project timeline will be dependent on when the proposed developments are constructed. City to assess every fiscal year. (3) Developments have already been completed or are nearing completion.. AbbreviationsCIP: Capital Improvement ProgramDR: dimension rationHDPE: high density polyethyleneLF: linear feetOPPC: opinion of probable project cost Table 7.2
Category 2 - CIP Project Summary
2025 Sewer System Master Plan
East Palo Alto, California
EPA Master Plan Tables - CIP Project Breakdown 5.6.2025.xlsx Page 1 of 1 Freyer & Laureta, Inc.

Last Printed: 6/23/2025
187
Project # Improvement Description Proposed Pipe Sizes
Approximate
Length of Pipe
(LF)
Projected
OPPC ($)

3.1 Pipeline Replacements on Dumbarton Avenue, Palo Verde Way, and Lilac Lane. 8-inch HDPE DR 17 1,786 1,786,000$

3.2 Pipe Replacements on Garden Street, Clarke
Avenue, Pulgas Avenue, Woodland Avenue,
and Bayshore Road.
8-inch, 10-inch HDPE DR 17 1,899 1,949,000$

3.2 Pipe Replacements on Glen Way and Capitol
Avenue. 8-inch HDPE DR 17 1,425 1,398,000$

3.2 Pipe Replacements on Bay Road and Weeks
Street. 8-inch, 16-inch, 18-inch HDPE DR 17 1,138 2,155,000$ Total 6,248 $ 7,288,000
Notes(1) See Figure 7.3 for limits of improvements.AbbreviationsCIP: Capital Improvement ProgramDR: dimension rationHDPE: high density polyethyleneLF: linear feetOPPC: opinion of probable project cost Table 7.3
Category 3A - CIP Project Summary
2025 Sewer System Master Plan
East Palo Alto, California
(2) Pipes within this project category are all remaining pipes that have not been included in Category 1 or Category 2. projects.

EPA Master Plan Tables - CIP Project Breakdown 5.6.2025.xlsx Page 1 of 1 Freyer & Laureta, Inc.

Last Printed: 6/18/2025
188
Project # Improvement Description Proposed Pipe Sizes Proposed Development (If applicable) Project Priority Approximate Length of Pipe (LF) Projected OPPC ($) Notes

1.1 Pipeline Replacement on Menalto Avenue, Poplar Avenue, Bay Road, and Elliot Drive 8-inch, 10-inch, 12-inch HDPE DR 17 4,833 6,042,000$ Projects will need Encroachment Permit with City of Menlo Park. Project will involve crossing Bayshore Freeway.

1.2 Pipeline Replacement on Trunk Line in Creek,
Beech Street, Larkspur Drive, and Gardenia
Ave
8-inch, 12-inch, 16-inch, 30-inch HDPE
DR 17 2,668 11,315,000$
Environmental Permits will be required. Trunk Line improvements are located on Creek. Coordination will be required for PG&E gas line.

2.1 Pipeline Replacement on Bayshore Road,
Donohoe Street, Cooley Ave, and O'Connor
Street
8-inch, 10-inch, 12-inch, 24-inch HDPE
DR 17
Woodland Parks (2001 Manhattan) & 2120-
60 Euclid Avenue See Note 2 3,460 7,466,000$
Project will involve crossing Bayshore Freeway. Project should be continued to be re-evaluated as structural deficiencies may be moved to a higher priority project if proposed development projects are not constructed soon.

2.2 Pipeline Replacement on University Avenue,
Runnymede Street, Clarke Avenue, and Beech
Street
10-inch, 12-inch HDPE DR 17 Woodland Parks (2001 Manhattan) & 2120- 60 Euclid Avenue See Note 2 4,188 9,795,000$ Project will include coordination with PG&E on gas line on Beech Street.

2.3 Pipeline Replacement on Trunk Line in Creek 30-inch HDPE DR 17 Ravenswood Area See Note 2 2,981 17,635,000$ Environmental Permits will be required. Trunk Line improvements are located on Creek.

2.4 Pipeline Replacement on Bay Road and Pulgas
Avenue
8-inch, 10-inch, 24-inch, 30-inch HDPE
DR 17
2485 Pulgas Avenue (3)
2535 Pulgas Ave (Office) 2519 Pulgas Ave (Office)
1804 Bay Road1675 Bay Road
See Note 2 2,799 9,293,000$
Project should be continued to be re-evaluated as structural deficiencies may be moved to a higher priority project if proposed development projects are not constructed soon.

2.5 Pipeline Replacement on Maple Lane. 10-inch HDPE DR 17 Mid-Pen Housing (965 Weeks Street) (3) See Note 2 1,161 1,401,000$ 2.6 Pipeline Replacement on O'Connor Street.

Project will also include 11 Smart Cover Meters
to be installed similar to the subbasin locations
notated in V&A Flow Monitoring Study.
12-inchHDPE DR 17 Light Tree Apartments (East Bayshore Road) (3) See Note 2 841 1,377,000$ Project will require coordination for two 24-inch PG&E Gas Main Transmissions. Project will also reinstate City's Flow Monitoring Program.

2.7 New Parallel Trunk Line within San
Francisquito Creek on Palo Alto Golf Course 24-inch HDPE DR 17 Ravenswood Area See Note 2 1,569 5,832,000$ Project should be re-evaluated on a yearly basis. As project scope on developments may be reduced/removed.

3.1 Pipeline Replacements on Dumbarton Avenue, Palo Verde Way, and Lilac Lane. 8-inch HDPE DR 17 1,786 1,786,000$

3.2 Pipe Replacements on Garden Street, Clarke
Avenue, Pulgas Avenue, Woodland Avenue,
and Bayshore Road.
8-inch, 10-inch HDPE DR 17 1,899 1,949,000$

3.3 Pipe Replacements on Glen Way and Capitol
Avenue. 8-inch HDPE DR 17 1,425 1,398,000$

3.4 Pipe Replacements on Bay Road and Weeks
Street. 8-inch, 16-inch, 18-inch HDPE DR 17 1,138 2,155,000$ Grand Total 30,750 $ 77,444,000
Notes(1) See Figure 7.4 for limits of improvements.(2) Project timeline will be dependent on when the proposed developments are constructed. City to assess every fiscal year. (3) Developments have already been completed or are nearing completion.AbbreviationsCIP: Capital Improvement ProgramDR: dimension rationHDPE: high density polyethyleneLF: linear feetOPPC: opinion of probable project cost(4) Category 3B projects will include the remaining portion of the sewer system 74% for existing VCP is suggested to be replaced over a 25-year period based on available funds. The OPPC for the remaining aging infrastructure will be approximately $4.3 M/yr (6,000LF/yr), with an overall total of $107 M. It is important to note that this cost is based on slip lining repair and partial replacement only.

Table 7.4
East Palo Alto, California
2025 Sewer System Master Plan
Overall – Proposed Capital Improvement Plan
EPA Master Plan Tables - CIP Project Breakdown 5.6.2025.xlsx Page 1 of 1 Freyer & Laureta, Inc.

Last Printed: 6/18/2025
189
Project # Improvement Description Proposed Pipe Sizes Unit Unit Price ($) Approximate Length of Pipe (LF) Projected OPPC ($) - Slip line, repair and replacement 8-inch through 24-inch HDPE DR 17 LF 750$ 142,928 107,196,000$ 142,928 $ 107,196,000
5,717 $ 4,287,840
Notes(3) Project work would occur beyond the immediate timeline of CIP work presented in the Master Plan. (4) Average annual cost is taken over a 25-year period. AbbreviationsCIP: Capital Improvement ProgramDR: dimension rationHDPE: high density polyethyleneLF: linear feetOPPC: opinion of probable project cost Table 7.5
Category 3B - CIP Project Summary
2025 Sewer System Master Plan
East Palo Alto, California
(2) Cost for full replacement and manhole replacement will increase the OPPC.

Total
(1) Cost per LF is a general estimate based on use of predominately trenchless pipe repair systems and some as needed replacement. Use for conceptual purposes only.

Average Annual Totals (4)
EPA Master Plan Tables - CIP Project Breakdown 5.6.2025.xlsx Page 1 of 1 Freyer & Laureta, Inc.

Last Printed: 6/18/2025
190
Table 8.1
Impact Fee Calculations
2025 Sewer System Master Plan
East Palo Alto, California

AT FULL BUILDOUT
Projected Total ADWF Increase (gpd) (1) 1,560,000
Projected Total EDU Increase (2) 7800
Development Share of Cost of Capacity Assurance (3) $ 4,380,500 Total Cost of Improvements Due to Development (4) $ 49,046,000 Total Cost of Treatment (5) $ 7,800,000
Impact Fee per EDU(6) 7,800$
Notes
(1) Projected Total ADWF Increase is from the EPASD 2025 Sewer System Master Plan. (2) Projected Total EDU Increase was calculated using a rate of 200 gpd/EDU. (3) Refer to Sewer Impact Fee Memorandum, Table 2.
(4) Refer to Sewer Impact Fee Memorandum, Table 7.
(5) Total Cost of Treatment is based on EPASD reported cost of $5 million per 1.0 MGD of treatment capacity. It should be noted that EPASD current 7.96% ownership of the PARWQCP is equivalent to ADWF capacity of 3.06 MGD. The total project ADWF at full buildout is 3.3 MGD based on 200 gpd/EDU and 12,730 EDUs. Therefore, the Total Cost of Treatment presented above is for new development to buy-in to the available treatment capacity. (6) Impact fee is calculated by dividing the total cost of improvements, capacity assurance, and treatment by the projected Total EDU increase and rounding to nearest $100.

Abbreviations
ADWF: Average Dry Weather Flow
EDUs: Equivalent Dwelling Units
gpd: gallons per day
EPASD_Impact FeeTables_2025-05-06.xlsx Page 1 of 1
Freyer & Laureta, Inc.

Last Printed: 6/23/2025 191
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
192
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
193
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
194
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
195
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
196
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
197
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
198
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
199
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
200
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
201
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
202
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
203
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
204
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
205
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
206
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
207
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
208
JOB NO.

FIGURE 06/20/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ZGROJTT
209
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers.

APPENDIX A
2035 General Plan and Ravenswood Business Specific
Plan Land Use Excerpts
210
CHAPTER 4: LAND USE AND URBAN DESIGN
CITY OF EAST PALO ALTO: GENERAL PLAN 2035 | 4-13
Table 4-2: Land Use Classification System
Major
Classes
Maximum
Density / FAR
Land Use Designation and Summary
Description
Maximum Building Height
(see zoning code for further
restrictions and standards)

RESIDENTIAL
0 – 12 du/a Low Density Residential (R-LD). Single-family dwellings, with 2nd units allowed on some
parcels.

Maximum height of 2 stories and
26 feet.
12 – 22 du/a Medium Density Residential (R-MD). A range of multi-family residential uses including second
units, single-family, duplex, triplex, quadplex,
rowhouses, courtyard buildings and small-scale
multi-family buildings.

Maximum height of 3 stories and
36 feet.
22 – 43 du/a High Density Residential (R-HD). A range of multi-family housing types ranging from
townhomes to multi-family apartments at
moderate to high densities.

Maximum height of 5 stories and
60 feet.
43 – 86 du/a Urban Residential (R-UHD). High-density multifamily dwellings (apartments, condos, and SROs).Maximum height of 7 stories and 75 feet.

COMMERCIAL
Up to 22 du/a;

1.0 FAR
Neighborhood Commercial (NC). Local-serving
retail, services and related uses.

Maximum of 3 floors or 36 feet.

Up to 2.0 FAR General Commercial (GC). Regional retail, office, and service-oriented business activities serving a
community-wide population or broader market.

Maximum of 3 stories and 75
feet.

Up to 3.0 FAR Office (OC). Single-tenant or multi-tenant offices that include professional, legal, medical,
financial, corporate and general business offices.

Maximum of 8 stories or 100
feet, whichever is greater.

MIXED USE
Up to 22 du/a;

1.0 FAR
Mixed Use Low (MUL). Low-density mixed-use. Maximum of 3 stories and 36 feet.

Up to 65 du/a;

1.75 FAR
Mixed Use Corridor (MUC). Multi-story mixeduse buildings.Maximum 5 stories or 60 feet.

Up to 86 du/a;

2.5 FAR
Mixed Use High (MUH). Multi-story mixed-use
buildings at a larger scale than MUC.

Maximum of 8 stories or 100
feet, whichever is greater.

INDUSTRIAL
Up to 1.0 FAR General Industrial (I-G). Industrial (storage and manufacturing), and R&D (lab/medical).

Maximum of 3 stories or 30 feet.

Ranges from

0.75 to 3.0 FAR Industrial Buffer (I-B). High-quality office buildings, along with a limited range of
manufacturing and repair businesses.

Maximum of 8 stories or 100
feet. Maximum height within 200
feet of University Village area is 3
stories above grade.

COMMUNITY
Determined
during approval
Parks/Recreation/Conservation (PRC). Public
recreational uses, including park and open space.
n/a
N/A Resource Management (RM). Preservation of
sensitive open space lands in a natural condition.
n/a
N/A
Public/Institutional (PI). Education, city
buildings, fire/police stations, & other uses.
n/a
211
CHAPTER 4: LAND USE AND URBAN DESIGN
CITY OF EAST PALO ALTO: GENERAL PLAN 2035 | 4-14

Figure 4-2: General Plan Land Use Designations
212
RAVENSWOOD / 4 CORNERS SPECIFIC PLAN
CITY OF EAST PALO ALTO | PUBLIC REVIEW DRAFT 117
213
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers.

APPENDIX B

SANITARY SEWER MODEL CALIBRATION MEMO
214
Headquarters North Bay Office East Bay Office South Bay Office 150 Executive Park Blvd, Ste 4200 505 San Marin Dr, Ste A220 1101 Marina Village Pkwy, Ste 104 20863 Stevens Creek Blvd, Ste 400 San Francisco, CA 94134 Novato, CA 94945 Alameda, CA 94501 Cupertino, CA 95014 (415) 534-7070 (415) 534-7070 (510) 937-2310 (408) 516-1090 Memorandum
Re: East Palo Alto – Rebuilding EPASD sewer model in SewerGEMS Date: May 1, 2025
To: Richard Perez, City of East Palo Alto
Humza Javed, P.E. City of East Palo Alto
From: Greg Arifian P.E., Freyer & Laureta, Inc.

Rheanna Ostrea, Freyer & Laureta, Inc.

Zoe Gnass, Freyer & Laureta, Inc.

Reviewed: Jeff Tarantino, Freyer & Laureta, Inc.
1 Introduction
Freyer and Laureta, Inc. (F&L) has prepared this memorandum to document the development of a new sewer collection system model. The East Palo Alto Sanitary District’s (EPASD) wastewater collection system was developed by EPASD using Hydra 7 software by Pizer Incorporated (Hydra 7). The Hydra 7 hydraulic model was first used by EPASD in the 2015 Master Plan. The hydraulic model created a mathematical representation based on the physical properties and operational information of the system and was calibrated using field data. As the initial Hydra 7 model software is no longer supported, the model needed to be rebuilt with modern software. F&L was tasked to recreate the hydraulic model using a GIS-based hydraulic model platform, which was done using SewerGEMS within OpenFlows Sewers Advanced by Bentley Systems, Incorporated. This memorandum outlines the steps that were taken to recreate and validate the model.
2 Model Methodology
F&L used a structured workflow to develop the SewerGEMS model. The legacy Hydra7 software was inaccessible, so the approach began with a research phase. This involved compiling archived and limited GIS sewer maps, PDFs, and database output files. Thereafter a series of tasks were developed, often iterative, to produce a final working model.

The major tasks and sub-tasks identified became the basis of the model rebuilding approach and included:

1. Model Development
a. Gathering archived 2014 field, model, and mapping data used in the 2015 Master plan b. Re-building a complete and detailed sewer map in GIS c. Importing sewer model and field flow data

2. SewerGEMS model Calibration
a. Iteratively updating sewer properties through calibration b. Developing the Average Dry Weather Calibration buy analyzing HGL c. Therafter completing the Peak Wet Weather Calibration

3. Peformaing final quality checks on the SewerGEMS model results for final accuracy

4. Next steps: Model the 2025 and 2035 sewer conditions 3 Model Development
215
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers 2

3.1 Gather Archived Model and Mapping Data
The first step in developing the updated model was to gather all available datasets from EPASD to support the construction of the ArcGIS sewer map using existing EPASD shapefiles, Microsoft Access database files, and Excel spreadsheets associated with the Hydra7 model developed for the 2015 Master Plan. Once all data sources were assembled, the information was reviewed and organized to confirm the accuracy and completeness of the sewer system inputs required for GIS mapping.

3.2 Build ArcGIS Sewer Map
The next step in the modeling process was to construct an accurate and functional ArcGIS map of EPASD’s sewer system. The GIS map serves as the spatial foundation for the hydraulic model and must reflect reliable infrastructure attributes and connectivity. Archived GIS shapefiles were imported into ArcGIS and systematically compared to the Hydra7 model databases to verify the accuracy of system components, including manholes, pipes, and associated attributes.

To ensure data accuracy, key infrastructure attributes were reviewed across the archived GIS shape and model files.

These features included manhole IDs, rim and invert elevations, pipe lengths, diameters, friction factors, and connectivity. The Hydra7 model contained the most recent field-verified measurements and system-wide modeling results and was used as the primary reference for validating and correcting discrepancies in the spatial data.

The following assumptions were applied in developing the ArcGIS sewer map:

1. Hydraulic Attribute Consistency: The Hydra7 data was assumed to represent the most accurate and current values for manhole and pipe attributes, including rim and invert elevations, lengths, diameters, and Manning’s n values.

2. Pipe Material and Friction Factors: A single Manning’s roughness coefficient of n = 0.013 was applied throughout the system, consistent with vitrified clay pipe, the predominant material in EPASD’s network, and validated by the Civil Engineering Reference Manual.

3. Manhole Dimensions: All manholes were modeled as 48-inch diameter circular structures, in accordance with EPASD standard design specifications.

4. Invert Elevation Logic: Invert elevations were assumed to match the lowest connected pipe at each manhole.

Given EPASD’s relatively flat topography and supporting field observations, this assumption provides a reasonable basis for establishing flowlines. The horizontal datum used is the North American Datum of 1983 (NAD83, NSR 2007), and the vertical datum is the National Geodetic Vertical Datum of 1929 (NAVD 29).

5. Head Loss Representation: Minor losses at manholes were incorporated using industry-standard head loss coefficients for pipe bends. These values were based on the Standard Loss Method as documented in Bentley’s OpenFlows Water Infrastructure modeling software.

The GIS base map and associated attribute dataset formed the foundation for updating the hydraulic model and performing system capacity assessments.

3.3 SewerGEMS Model Development
Following the creation of the ArcGIS sewer map, the spatial data was imported into SewerGEMS within Bentley’s OpenFlows Sewer Advanced platform to initiate hydraulic model development. Upon import, all manhole and pipe 216
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers 3 segment attributes—including labels, elevations, and connectivity—were reviewed against the GIS map to ensure accurate data transfer.

During this verification process, several issues were identified and corrected prior to running any simulations:

1. Duplicate and Conflicting Identifiers: The imported GIS data contained several duplicate or conflicting manhole and pipe labels. The discrepancies were resolved by cross-referencing EPASD’s official system map from the 2015 Master Plan. All naming conventions were updated within the GIS data to maintain consistency with EPASD records.

2. Connectivity Errors: Several manholes and pipes were found to be improperly connected or entirely disconnected within the GIS data. The GIS data was corrected to ensure continuous hydraulic flow throughout the modeled network.

To validate basic model functionality, ADWF from the Hydra7 dataset were input into the SewerGEMS model and used to run a preliminary test simulation. The test simulation served as an initial calibration step and revealed inconsistencies that required updates to certain model parameters. The following adjustments and assumptions were made:

1. Head Loss Adjustments: The original Hydra7 model did not account for head loss at manholes. When industry-standard head loss coefficients (as described in Section 3.2) were applied, the resulting flow levels did not align with observed average dry weather field data. To reconcile this, all head loss values at manholes (nodes) were temporarily set to zero for the purposes of model calibration.

2. Ponding Area Assumptions: Manholes were assigned a ponding area property value of zero. The ponding area assumption setting enabled the model to track and report the volume of predicted Sanitary Sewer Overflows (SSOs) lost during simulations. The approach was developed iteratively during the calibration process.

The updates described above resulted the SewerGEMS model accurately represented EPASD’s sewer system and was properly configured for subsequent calibration and capacity analysis. 4 SewerGEMS Model Calibration
The SewerGEMS model calibration process focused on validating two critical parameters: (1) the hydraulic grade line (HGL) and (2) flow rates at model nodes. Calibration was conducted for two distinct flow scenarios: (1) Average Dry Weather Flow (ADWF) and (2) Peak Wet Weather Flow (PWWF). The methods used to validate input data for both scenarios is described in the follow sections.

4.1 Average Dry Weather Calibration
For ADWF conditions, flow inputs for all upstream manholes in the system were derived from the Hydra7 model Excel files. Figure 1 illustrates the locations of the upstream manholes, which were designated as flow injection points. The total ADWF injection flow was cross-checked and validated against the Hydra7 model database, which reports a total system flow of 1.53 million gallons per day (MGD).

SewerGEMS model results for ADWF were compared against Hydra7 model data and available field data for flow rates and maximum HGL at each manhole. Table 1 presents the comparison of flows and HGL values between the two models. The comparison showed good agreement, with a few outliers identified. These discrepancies are addressed in more detail in Section 5.1, Average Dry Weather Results. 217
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers 4 The ADWF calibration step confirmed that the input parameters were accurately transferred to the SewerGEMS model and that base flow conditions were properly established. With ADWF successfully calibrated, the next step was to validate the model under peak wet weather conditions.

4.2 Peak Wet Weather Calibration
The calibration of the PWWF involved importing the injection flows from the Hydra7 model into SewerGEMS. The resulting predictions for surcharge and SSOs did not align with those from the Hydra7 model, likely due to insufficient information on how the Hydra7 model accounted for surcharged conditions and SSOs. The discovered discrepancy prompted an iterative process to investigate and resolve the differences in model results, leading to the following findings:

1. Flow Losses: Model simulations indicated flow losses within the system. To address this, a ponding property was added to capture and return the predicted SSOs, as outlined in Section 2.3. This property update was applied system-wide for both ADWF and PWWF scenarios.

2. Surcharge and SSOs: Hand-calculated hydraulic analyses showed that the Hydra7 model predicted surcharge and SSOs in locations where they were unlikely to occur. These predictions did not align with field observations or the EPASD’s operational experience. As a result, the SewerGEMS model was found to more accurately reflect existing conditions.

3. Flow Adjustments: Discrepancies were observed in the injection flow rates, with high flows in singlefamily housing areas and low flows in multi-family dwellings. To correct this, flow injections at selected upstream manholes were adjusted to better align with EPASD’s 2013 zoning data. Flow rates in singlefamily areas were reduced, while multi-family areas received increased flow injections. These adjustments maintained the total system flow of 5.78 MGD, as recorded in the Hydra7 database, and provided a more realistic loading scenario across the system. Table 2 summarizes the changes in injection flows and the affected manholes.
5 SewerGEMS Model Results
Following the calibration process described in the previous section, the SewerGEMS model results were compared to the original hydraulic data from the Hydra7 model from the 2015 Master Plan. The comparison between the Hydra 7 and SewerGems output was performed to assess the accuracy and reliability of the SewerGEMS model in representing the system’s performance under both ADWF and PWWF conditions. The sections below detail the methods used for this comparison and summarize the key findings from each scenario.

5.1 Average Dry Weather Results
For ADWF, the maximum HGL from SewerGEMS at each manhole was compared to the HGL from the original Hydra7 model. In most cases, the predicted HGLs from SewerGEMS differed by no more than 6 inches from those predicted by the Hydra7 model, as shown in Table 1.

Five manholes were identified as outliers, likely due to one of the following causes:

1. Locations near manholes with split flow directions or passive bypass piping, as shown in Figure 2. Manhole Outliers: E33, L10, M2, M3.
218
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers 5

2. Duplicate manhole identifications, as discussed in Section 2.2. The Hydra7 model presented multiple data points for these manholes, making it unclear which data should be used for comparison. Manhole Outlier: H29.

Figure 3 shows the manhole outliers, which exhibited HGL differences ranging from nine inches to 24 inches, with SewerGEMS predicting lower HGLs than the Hydra7 model. The discrepancies are likely due to differences in routing strategies between the two models. However, as these outliers had minimal impact on adjacent branches, the outliers were considered insignificant in terms of overall model accuracy.

The full model outputs for ADWF are included in Attachment 1.

5.2 Peak Wet Weather Results
As described in Section 3.2, the PWWF model results could not be fully validated using HGL comparisons due to inconsistencies in the model. To verify the PWWF results, the following methods were used:

1. Manhole flows were compared to ensure that the total system flow of 5.78 MGD matched the total flow in Hydra7.

2. Predicted SSO locations were validated within the model.

3. System segments known to be surcharged, based on historical data and field observations, were validated in the model, including previous bypass pumping plans and flow metering results.

Figure 4 presents a map of predicted SSOs and surcharged segments in SewerGEMS. The model outputs and hydraulics for PWWF are included in Attachment 2.
6 Conclusions and Next Steps
The SewerGEMS model recreation has been validated as an acceptable tool for analyzing flows within EPASD sewer system. Based on the calibration and validation efforts, the model is now ready for more detailed analysis and future planning. The next steps in the process include:

1. Updating the GIS map file to reflect the most current As-Built data for the 2025 sanitary sewer system.

2. Recalibrating the hydraulic model under the following scenarios:
a. 2025 Conditions: Incorporating flow injections from the latest developments based on AsBuilt data to identify potential system issues or deficiencies. b. 2035 Conditions: Adding flow injections from the East Palo Alto 2035 General Plan and Ravenswood Specific Planto identify necessary system upgrades to accommodate future growth.
c. 2035 Enhanced Conditions: Adding flow injections from the 2035 General Plan, Ravenswood Specific Plan, and approved planned developments to identify infrastructure needs for future development.

3. Updating EPASD’s Master Plan to incorporate the results of the updated calibration and system analysis.

The next steps described above will ensure the model remains accurate and relevant for both current and future sewer system management.
7 References
219
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers 6 EPASD, 2002 East Palo Alto Sanitary District Standard Specifications for Design and Construction of Sanitary Collection and Conveyance Facilities. East Palo Alto Sanitary District. June 6, 2002.

F&L, 2015 East Palo Alto Sanitary District Master Plan Update. Freyer & Laureta, Inc. March 2015.

K/J, 2002 East Palo Alto Sanitary District Master Plan Update. Kennedy/Jenks Consultants. September 2002.

VA, 2012 2011-2012 Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study. V&A Consultants. June 2012.

Attachments:
• Tables
o Table 1: Selected Average Dry Weather HGL and Flow Comparison o Table 2: Peak Wet Weather Updated Injection Flows
• Figures
o Figure 1: EPASD Sanitary Sewer Service Area and Flow Injection Manholes o Figure 2: Typical Bypass Manhole
o Figure 3: Manhole Outliers
o Figure 4: SewerGEMS PWWF Model Results
• Attachments
o Attachment 1: Average Dry Weather Flow Model Results
o Attachment 2: Peak Wet Weather Flow Model Results
220
Model Calibration Memorandum East Palo Alto Sanitary District Table 1.1 HGL Comparison
MANHOLE LABEL 2013 Hydra7 Model12025 SewerGEMS Model Change from Hydra7 Model A15 0.63 0.55 0.08
B13 9.81 9.81 0.00
E1 4.05 4.06 (-0.00)
E2 4.59 4.61 (-0.02)
H3 1.20 1.14 0.06
I12 -1.87 -1.85 (-0.02)
I3 -3.41 -3.43 0.02
K28 -3.58 -3.61 0.03
K4 -3.78 -3.81 0.04
T20 -3.54 -3.54 0.00
T13 -6.60 -6.63 0.03
Table 1.2 Flow Comparison
MANHOLE LABEL 2013 Hydra7 Model12025 SewerGEMS Model Change from Hydra7 Model A15 0.39 0.37 0.02
B13 0.14 0.14 0.00
E1 0.40 0.41 (-0.01)
E2 0.27 0.28 (-0.01)
H3 0.58 0.55 0.03
I12 0.22 0.22 (-0.00)
I3 0.82 0.79 0.03
K28 0.14 0.13 0.02
K4 0.26 0.24 0.02
T20 0.54 0.52 0.02
T13 1.63 1.51 0.12
Notes:

Abbreviations:
ft feet
HGL Hydraulic Grade Line
MGD Million Gallons/Day

1. 2013 Hydra 7 Model data is taken from the East Palo Alto Sanitary District Master Plan Update, Freyer & Laureta, Inc., March 2015.

Flows (MGD)
HGL (ft)
Table 1: Selected Average Dry Weather HGL and Flow Comparison Last Printed on: 3/27/2025 Page 1 of 1 Freyer & Laureta, Inc. 221 Model Calibration Memorandum East Palo Alto Sanitary District Manhole Label
2013 PWWF Injection
Value1 (cfs)
2025 PWWF Injection Value
(cfs)
Change from Hydra7 Model
C26 0.19 0.20 (-0.01)
D50 0.23 0.35 (-0.12)
D17 0.08 0.20 (-0.12)
D55 0.07 0.12 (-0.05)
D70 0.06 0.14 (-0.08)
D71 0.06 0.12 (-0.06)
D39 0.12 0.01 0.11
D40 0.12 0.01 0.11
D28 0.18 0.17 0.01
D69 0.07 0.03 0.04
D62 0.13 0.02 0.12
D68 0.07 0.03 0.04
Notes:

Abbreviations:
cfs cubic feet / second
PWWF Peak Wet Weather Flow

1. 2013 Hydra 7 Model data is taken from the East Palo Alto Sanitary District Master Plan Update, Freyer & Laureta, Inc., March 2015.

Table 2 - Peak Wet Weather Updated Injection Flows
Last Printed on: 3/27/2025 Page 1 of 1 Freyer & Laureta, Inc. 222 JOB NO.

FIGURE 4/4/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ROGKA JJT
223

SURVEYORS
www.freyerlaureta.com

CIVIL ENGINEERS
150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070

CONSTRUCTION MANAGERS
224
JOB NO.

FIGURE 4/4/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ROGKA JJT
225
JOB NO.

FIGURE 4/4/2025 DATE: SCALE: DESIGNED: DRAWN: CHECKED: PROJ. ENGR: SURVEYORS www.freyerlaureta.com CIVIL ENGINEERS 150 Executive Park Blvd Suite 4200 San Francisco, CA 94134 (415)534-7070 CONSTRUCTION MANAGERS 1" = 1000' 221009 ROGKA JJT
226
Attachement 1
Average Dry Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
A1+A2 A1 16.28 2 A2 15.82 1.92 79.9 0.001 Circle 12 0.013 0.378 2.39 0 0.5101 1.1273 33.5 0 39.8 FALSE 2.435A2+A5 A2 15.82 1.82 A5 14.53 1.57 244.2 0.001 Circle 12 0.013 0.395 2.56 0.02 0.5271 1.1399 34.7 1.8 46.6 FALSE 2.311A3+A2 A3 14.86 8.76 A2 15.82 2.12 287.5 0.023 Circle 6 0.013 0.017 0.85 0.05 0.017 0.8527 2 10.7 10.1 FALSE 8.907A4+A3 A4 14 9.48 A3 14.86 8.86 312 0.002 Circle 6 0.013 0.017 0.88 0.06 0.017 0.2501 6.8 11.7 11.7 FALSE 9.566A5+A8 A5 14.53 1.57 A8 13.85 1.53 124.3 0 Circle 15 0.013 0.412 2.56 0 0.5441 1.1587 35.6 0 34 FALSE 2.049A6+A5 A6 13.72 7.32 A5 14.53 5.81 286.8 0.005 Circle 6 0.013 0.017 0.9 0.06 0.017 0.4071 4.2 12.6 15 FALSE 7.429A7+A6 A7 14 8.03 A6 13.72 7.42 306 0.002 Circle 6 0.013 0.017 0.88 0.06 0.017 0.2505 6.8 11.7 17.2 FALSE 8.116A8+A9 A8 13.85 1.43 A9 12.82 1.16 61.2 0.004 Circle 15 0.013 0.412 2.65 0.02 0.5441 4.2904 9.6 1.5 24.6 FALSE 1.825A9+A10 A9 12.82 0.62 A10 11.42 0.57 181.2 0 Circle 15 0.013 0.412 2.56 0 0.5441 1.073 38.4 0 36.3 FALSE 1.455A10+A15 A10 11.42 0.47 A15 9.93 0.03 299.3 0.001 Circle 15 0.013 0.4413 2.91 0.04 0.5734 2.4767 17.8 3.3 33.7 FALSE 0.897A11+A10 A11 11.83 2.53 A10 11.42 1.12 417.5 0.003 Circle 6 0.013 0.0293 0.72 0.01 0.0293 0.3261 9 2.9 23.9 FALSE 2.654A12+A11 A12 9.52 4.07 A11 11.83 2.63 485.1 0.003 Circle 6 0.013 0.0293 1.05 0.08 0.0293 0.3057 9.6 16 25.4 FALSE 4.198A13+A12 A13 7.19 5.15 A12 9.52 4.07 412.1 0.003 Circle 6 0.013 0.0293 1.05 0.08 0.0293 0.2872 10.2 16.2 25.9 FALSE 5.286A14+A13 A14 8.06 5.91 A13 7.19 5.19 288.3 0.002 Circle 6 0.013 0.0293 1.1 0.09 0.0294 0.2804 10.4 18 26.8 FALSE 6.043A15+A16 A15 9.93 -0.03 A16 8.08 -0.17 435.1 0 Circle 15 0.013 0.4413 2.95 0.05 0.5734 1.1587 38.1 3.9 42.6 FALSE 0.551A16+A21 A16 8.08 -0.22 A21 7.13 -0.42 296.3 0.001 Circle 15 0.013 0.4553 2.86 0.02 0.5874 1.6782 27.1 1.3 38.7 FALSE 0.29A17+A16 A17 8.77 1.57 A16 8.08 0.73 422.7 0.002 Circle 6 0.013 0.004 0.55 0.01 0.004 0.2501 1.6 1.1 4.3 FALSE 1.592A18+A16 A18 7.05 1.45 A16 8.08 0.73 441.8 0.002 Circle 6 0.013 0.01 0.71 0.03 0.01 0.2265 4.4 6.4 11 FALSE 1.506A19+A18 A19 6.77 2.98 A18 7.05 1.45 213.5 0.007 Circle 6 0.013 0.01 0.61 0.01 0.01 0.475 2.1 2.2 8.7 FALSE 3.058A20+A19 A20 5.62 3.73 A19 6.77 3.05 339.8 0.002 Circle 6 0.013 0.01 0.74 0.04 0.01 0.251 4 7.8 10.8 FALSE 3.783A21+A23 A21 7.13 -0.52 A23 7.01 -0.8 155.1 0.002 Circle 15 0.013 0.4553 2.89 0.02 0.5888 2.7445 16.6 1.8 31.4 FALSE -0.115A22+A29 A22 6.99 -0.92 A29 6.36 -1.21 369.1 0.001 Circle 18 0.013 0.463 3.02 0.04 0.5955 2.9442 15.7 2.8 30.2 FALSE -0.452A23+A22 A23 7.01 -0.8 A22 6.99 -0.92 13.8 0.009 Circle 15 0.013 0.463 2.91 0.02 0.5984 6.0235 7.7 1.6 32.7 FALSE -0.45A24+A23 A24 7.7 1.62 A23 7.01 0.37 250.6 0.005 Circle 6 0.013 0.0077 0.72 0.04 0.0077 0.3963 1.9 7.1 9 FALSE 1.66A25+A24 A25 8.36 2.89 A24 7.7 1.62 253.1 0.005 Circle 6 0.013 0.0077 0.72 0.04 0.0077 0.3974 1.9 7.3 9 FALSE 2.93A26+A25 A26 7.42 4.06 A25 8.36 2.89 234.1 0.005 Circle 6 0.013 0.0077 0.57 0.01 0.0077 0.3967 1.9 1.4 3.4 FALSE 4.087A27+A26 A27 6.96 5 A26 7.42 4.06 310.9 0.003 Circle 6 0.013 0.0077 0.72 0.04 0.0077 0.3085 2.5 7.1 9.1 FALSE 5.037A28+A29 A28 6.24 0.21 A29 6.36 -0.25 14.8 0.031 Circle 6 0.013 0.002 0.53 0 0.002 0.9892 0.2 0.9 0.9 FALSE 0.325A29+T29 A29 6.36 -1.24 T29 4.98 -1.62 345.5 0.001 Circle 18 0.013 0.465 2.98 0.03 0.5971 3.4835 13.3 2.1 28.2 FALSE -0.804A30+A28 A30 6.07 1.27 A28 6.24 0.32 301 0.003 Circle 6 0.013 0.002 0.53 0 0.002 0.3152 0.6 0.9 0.9 FALSE 1.275B2+A1 B2 16 2.46 A1 16.28 2.1 180.8 0.002 Circle 12 0.013 0.378 2.39 0 0.5101 1.5897 23.8 0 39.6 FALSE 2.87B3+B2 B3 18.59 2.64 B2 16 2.46 239.4 0.001 Circle 12 0.013 0.361 2.43 0.03 0.4931 0.9769 37 2.5 46.2 FALSE 3.137B4+B3 B4 20.32 3.42 B3 18.59 2.74 464.8 0.001 Circle 12 0.013 0.361 2.39 0.02 0.4931 1.3627 26.5 1.7 43 FALSE 3.871B5+B52 B5 18.61 4.51 B52 20.58 4.29 176.2 0.001 Circle 12 0.013 0.361 2.31 0 0.4931 1.2589 28.7 0 42 FALSE 4.957B6+B5 B6 18.29 5.6 B5 18.61 4.56 158.4 0.007 Circle 12 0.013 0.349 2.24 0 0.4811 2.8867 12.1 0 28.7 FALSE 5.893B7+B6 B7 18.66 5.76 B6 18.29 5.6 380.1 0 Circle 12 0.013 0.305 2.03 0 0.4371 0.7309 41.7 0 50 FALSE 6.298B8+B7 B8 20.55 6.5 B7 18.66 5.81 371 0.002 Circle 12 0.013 0.2883 1.94 0 0.4204 1.5364 18.8 0 37.3 FALSE 6.878B9+B8 B9 18.41 7.16 B8 20.55 6.55 350.9 0.002 Circle 12 0.013 0.2755 1.9 0.01 0.4076 1.4854 18.5 0.5 37.3 FALSE 7.539B10+B9 B10 16.86 7.61 B9 18.41 7.16 289.7 0.002 Circle 12 0.013 0.1951 1.53 0.01 0.3272 1.4041 13.9 1.1 34.6 FALSE 7.96B11+B10 B11 16.46 8.71 B10 16.86 7.66 201.4 0.005 Circle 12 0.013 0.1695 1.35 0 0.266 2.5724 6.6 0 23 FALSE 8.967B12+B11 B12 15.83 9.18 B11 16.46 8.76 277 0.002 Circle 12 0.013 0.1695 1.35 0 0.2231 1.3872 12.2 0 29.2 FALSE 9.475B13+B12 B13 15.33 9.53 B12 15.83 9.18 262.7 0.001 Circle 12 0.013 0.1695 1.35 0 0.1802 1.3004 13 0 27.4 FALSE 9.807B14+B13 B14 15.47 10.07 B13 15.33 9.53 253.1 0.002 Circle 12 0.013 0.1695 1.35 0 0.1695 1.6456 10.3 0 0 FALSE 10.289B15+B49 B15 20.29 12.19 B49 17.11 11.21 330.9 0.003 Circle 8 0.013 0.1695 1.35 0 0.1695 0.6576 25.8 0 0 FALSE 12.424B16+B15 B16 20.39 13.24 B15 20.29 12.19 327.3 0.003 Circle 8 0.013 0.1695 1.35 0 0.1695 0.6844 24.8 0 0 FALSE 13.469B17+B13 B17 19.31 13.31 B13 15.33 9.73 501.1 0.007 Circle 6 0.013 0.028 1.02 0.08 0.0429 0.4742 5.9 15 27.4 FALSE 13.448B18+B17 B18 22.26 14.3 B17 19.31 13.31 497.2 0.002 Circle 6 0.013 0.0259 0.7 0.12 0.0429 0.2504 10.3 24.2 38.3 FALSE 14.491B19+B12 B19 20.74 14.44 B12 15.83 9.88 499.6 0.009 Circle 6 0.013 0.0382 1.16 0.09 0.043 0.536 7.1 18.7 25.7 FALSE 14.573B20+B19 B20 23.22 19.12 B19 20.74 14.44 585 0.008 Circle 6 0.013 0.0519 1.21 0.09 0.0519 0.5018 10.3 17.9 17.9 FALSE 19.253B21+B11 B21 18.68 13.54 B11 16.46 9.36 399.6 0.01 Circle 6 0.013 0.0297 0.92 0.05 0.0431 0.5738 5.2 11 24.9 FALSE 13.698B22+B21 B22 24.77 18.67 B21 18.68 13.58 399.5 0.013 Circle 6 0.013 0.0288 0.8 0.03 0.0431 0.6333 4.5 6.4 23.8 FALSE 18.789B23+B22 B23 28 23.55 B22 24.77 18.67 380.2 0.013 Circle 6 0.013 0.0363 0.9 0.04 0.0429 0.6357 5.7 8.8 24 FALSE 23.67B24+B10 B24 22.52 15.82 B10 16.86 9.61 492.5 0.013 Circle 6 0.013 0.0284 1.02 0.08 0.0612 0.63 4.5 15.3 26.4 FALSE 15.971B25+B24 B25 27.09 18.84 B24 22.52 15.82 406.2 0.007 Circle 6 0.013 0.0256 0.87 0.05 0.0612 0.4838 5.3 9.5 30.2 FALSE 18.993B26+B25 B26 27.62 21.62 B25 27.09 18.84 401.5 0.007 Circle 6 0.013 0.0267 0.91 0.05 0.0356 0.4669 5.7 10.9 23.9 FALSE 21.742B27+B25 B27 25.46 19.69 B25 27.09 18.99 318 0.002 Circle 6 0.013 0.0256 1.03 0.08 0.0256 0.2632 9.7 16.2 24.4 FALSE 19.813B28+B27 B28 24.83 20.93 B27 25.46 19.69 202 0.006 Circle 6 0.013 0.0256 0.8 0.03 0.0256 0.4396 5.8 6.8 17.7 FALSE 21.024B29+B9 B29 19.43 13.68 B9 18.41 7.61 211.2 0.029 Circle 6 0.013 0.0804 0.97 0.01 0.0804 0.9512 8.5 2.9 23.4 FALSE 13.822B30+B29 B30 23.55 14.31 B29 19.43 13.83 243.2 0.002 Circle 6 0.013 0.0268 1.02 0.08 0.0268 0.2493 10.8 15.4 24.7 FALSE 14.442B31+B29 B31 21.81 15.76 B29 19.43 13.68 256.8 0.008 Circle 6 0.013 0.0536 1.18 0.08 0.0536 0.505 10.6 16.4 28.3 FALSE 15.903B32+B31 B32 26.3 16.37 B31 21.81 15.86 253.7 0.002 Circle 6 0.013 0.0268 1.06 0.09 0.0268 0.2516 10.7 17.2 25.9 FALSE 16.499B33+B31 B33 25.73 19.18 B31 21.81 15.76 279.8 0.012 Circle 6 0.013 0.0268 1.01 0.08 0.0269 0.6203 4.3 15.2 16.7 FALSE 19.266B34+B8 B34 24.69 15.24 B8 20.55 7.1 251.1 0.032 Circle 6 0.013 0.0128 0.75 0.04 0.0128 1.0102 1.3 7.5 7.1 FALSE 15.277B35+B34 B35 26.3 20 B34 24.69 15.24 363.8 0.013 Circle 6 0.013 0.0128 0.61 0.01 0.0128 0.6418 2 2 8.2 FALSE 20.047B36+B35 B36 24.45 20.41 B35 26.3 20 207 0.002 Circle 6 0.013 0.0128 0.77 0.04 0.0128 0.2497 5.1 8.2 12.1 FALSE 20.477B37+B6 B37 14.71 7.31 B6 18.29 6.74 262.3 0.002 Circle 6 0.013 0.044 0.85 0.03 0.044 0.2616 16.8 5 37.7 FALSE 7.5B38+B50 B38 12.43 7.93 B50 13.27 7.77 38.9 0.004 Circle 6 0.013 0.02 0.74 0.03 0.02 0.3598 5.6 5.6 5.6 FALSE 8.038B39+B38 B39 13 8.56 B38 12.43 8.03 265.5 0.002 Circle 6 0.013 0.01 0.73 0.04 0.01 0.2507 4 7.1 10.7 FALSE 8.614B40+B39 B40 13 9.17 B39 13 8.56 306.1 0.002 Circle 6 0.013 0.01 0.74 0.04 0.01 0.2505 4 7.6 10.5 FALSE 9.223 Attachments.xlsx/Calibration ADWF Page 1 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
227
Attachement 1
Average Dry Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
B41+B38 B41 11.68 8.37 B38 12.43 8.03 170 0.002 Circle 6 0.013 0.01 0.72 0.03 0.01 0.2509 4 6.9 10 FALSE 8.424B42+B41 B42 11.68 8.7 B41 11.68 8.37 166.3 0.002 Circle 6 0.013 0.01 0.73 0.04 0.01 0.2499 4 7.3 7.3 FALSE 8.753B43+B37 B43 15.97 8.74 B37 14.71 8.01 363.4 0.002 Circle 6 0.013 0.017 0.87 0.06 0.017 0.2515 6.8 11.5 17.1 FALSE 8.826B44+B2 B44 15.76 9.16 B2 16 2.46 296.4 0.023 Circle 6 0.013 0.017 0.86 0.05 0.017 0.8436 2 10.9 10.2 FALSE 9.33B45+B44 B45 14.05 9.86 B44 15.76 9.26 301 0.002 Circle 6 0.013 0.017 0.88 0.06 0.017 0.2505 6.8 11.6 17.2 FALSE 9.946B46+B5 B46 19 13.75 B5 18.61 12.56 16.9 0.07 Circle 6 0.013 0.012 0.6 0.01 0.012 1.4889 0.8 1.6 3.9 FALSE 13.797B47+B46 B47 20.58 14.06 B46 19 13.75 157.8 0.002 Circle 6 0.013 0.012 0.79 0.05 0.012 0.2487 4.8 9 12.3 FALSE 14.123B48+B7 B48 22.9 7.11 B7 18.66 6.21 450.2 0.002 Circle 6 0.013 0.0167 0.87 0.06 0.0167 0.2509 6.7 11.5 16.8 FALSE 7.194B49+B14 B49 17.11 11.16 B14 15.47 10.07 327.7 0.003 Circle 8 0.013 0.1695 1.35 0 0.1695 0.6969 24.3 0 0 FALSE 11.4B50+B37 B50 13.27 7.77 B37 14.71 7.31 204.7 0.002 Circle 6 0.013 0.027 0.73 0.02 0.027 0.266 10.2 3.9 3.9 FALSE 7.9B51+B50 B51 14.15 9.95 B50 13.27 7.97 281.7 0.007 Circle 6 0.013 0.007 0.7 0.03 0.0071 0.4704 1.5 6.7 6.9 FALSE 9.983B52+B4 B52 20.58 4.29 B4 20.32 3.57 359.8 0.002 Circle 12 0.013 0.361 2.31 0 0.4931 1.5937 22.7 0.1 39.6 FALSE 4.688C1+B16 C1 23.15 14.8 B16 20.39 13.24 401.9 0.004 Circle 8 0.013 0.1695 1.35 0 0.1695 0.7528 22.5 0 0 FALSE 15.02C2+C1 C2 21.54 15.19 C1 23.15 14.85 204.3 0.002 Circle 8 0.013 0.1235 1.2 0.02 0.1235 0.4929 25.1 2.5 2.5 FALSE 15.422C3+C2 C3 22.97 17.37 C2 21.54 15.24 397.8 0.005 Circle 6 0.013 0.1065 1.11 0.02 0.1065 0.4106 25.9 3.2 3.2 FALSE 17.554C4+C3 C4 25.03 19.53 C3 22.97 17.42 436 0.005 Circle 6 0.013 0.0885 1.02 0.01 0.0885 0.3903 22.7 3 3 FALSE 19.695C5+C4 C5 25.49 20.95 C4 25.03 19.53 327.7 0.004 Circle 6 0.013 0.0885 1.02 0.01 0.0885 0.3693 24 3 3 FALSE 21.121C6+C5 C6 25.82 21.42 C5 25.49 20.99 87.5 0.005 Circle 6 0.013 0.0697 0.92 0.01 0.0697 0.3933 17.7 2.8 2.8 FALSE 21.56C7+C6 C7 34.43 23.65 C6 25.82 21.42 447.8 0.005 Circle 6 0.013 0.0697 0.92 0.01 0.0697 0.3959 17.6 2.8 2.8 FALSE 23.791C8+C7 C8 29.93 24.33 C7 34.43 23.65 400.9 0.002 Circle 6 0.013 0.0447 0.86 0.03 0.0447 0.2311 19.3 5.5 5.5 FALSE 24.534C9+C8 C9 30 24.55 C8 29.93 24.38 84.1 0.002 Circle 6 0.013 0.0437 0.87 0.03 0.0437 0.2523 17.3 6.2 6.2 FALSE 24.742C10+C9 C10 31.71 25.71 C9 30 24.55 300.8 0.004 Circle 6 0.013 0.0437 0.88 0.03 0.0437 0.3484 12.5 6.5 6.5 FALSE 25.873C11+C10 C11 41.2 28.9 C10 31.71 25.76 508 0.006 Circle 6 0.013 0.0248 0.67 0.01 0.0248 0.4411 5.6 2 2 FALSE 28.993C12+C1 C12 23.43 14.93 C1 23.15 14.85 264.8 0 Circle 6 0.013 0.046 0.79 0.01 0.046 0.0975 47.2 2.4 2.4 FALSE 15.237C13+C12 C13 23 15.99 C12 23.43 15.03 480.7 0.002 Circle 6 0.013 0.01 0.73 0.04 0.01 0.2507 4 7.3 10.4 FALSE 16.042C14+C12 C14 24.3 15.8 C12 23.43 14.97 282.1 0.003 Circle 6 0.013 0.036 0.95 0.05 0.036 0.3043 11.8 10.7 30.3 FALSE 16.092C15+C14 C15 22.5 18.05 C14 24.3 16.1 565.3 0.003 Circle 6 0.013 0.018 0.82 0.05 0.018 0.3295 5.5 9.2 15.7 FALSE 18.129C16+C14 C16 26.5 17.4 C14 24.3 16.05 272.9 0.005 Circle 6 0.013 0.018 0.92 0.07 0.018 0.3946 4.6 13.1 16.1 FALSE 17.477C17+C16 C17 27.07 19.62 C16 26.5 17.4 332.8 0.007 Circle 6 0.013 0.018 0.88 0.06 0.018 0.4583 3.9 11.5 14 FALSE 19.689C18+C17 C18 28 20.36 C17 27.07 19.62 369.6 0.002 Circle 6 0.013 0.018 0.89 0.06 0.018 0.2511 7.2 12.1 12.1 FALSE 20.45C19+C2 C19 21.59 15.49 C2 21.54 15.24 264.1 0.001 Circle 6 0.013 0.017 0.77 0.04 0.017 0.1726 9.8 7.5 21 FALSE 15.6C20+C19 C20 23.19 17.64 C19 21.59 15.54 198.5 0.011 Circle 6 0.013 0.0085 0.58 0.01 0.0085 0.5771 1.5 1.6 6 FALSE 17.671C21+C19 C21 23.94 17.74 C19 21.59 15.54 284.2 0.008 Circle 6 0.013 0.0085 0.72 0.04 0.0085 0.4937 1.7 7 7.4 FALSE 17.837C22+C21 C22 24.43 18.08 C21 23.94 17.79 91.8 0.003 Circle 6 0.013 0.0085 0.7 0.03 0.0085 0.3154 2.7 6.1 8 FALSE 18.121C23+C3 C23 23.27 18.07 C3 22.97 17.42 400.5 0.002 Circle 6 0.013 0.018 0.74 0.03 0.018 0.226 8 6.1 19.1 FALSE 18.427C24+C23 C24 25.53 18.72 C23 23.27 18.42 151.2 0.002 Circle 6 0.013 0.008 0.69 0.03 0.0081 0.2499 3.2 6.2 8 FALSE 18.763C25+C23 C25 25.08 19.73 C23 23.27 18.17 303.1 0.005 Circle 6 0.013 0.01 0.59 0.01 0.01 0.4025 2.5 1.5 1.5 FALSE 19.79C26+D9 C26 29.07 24.47 D9 27.55 21.3 435.8 0.007 Circle 6 0.013 0.0309 0.93 0.05 0.0488 0.4785 6.5 10.9 28.3 FALSE 24.612C27+C5 C27 25 21.41 C5 25.49 20.97 221.6 0.002 Circle 6 0.013 0.0188 0.75 0.03 0.0188 0.25 7.5 6.1 17.9 FALSE 21.507C28+C27 C28 27.89 23.34 C27 25 21.41 43 0.045 Circle 6 0.013 0.0115 0.6 0.01 0.0115 1.1887 1 1.6 4.6 FALSE 23.387C29+C28 C29 32.14 23.94 C28 27.89 23.34 298.4 0.002 Circle 6 0.013 0.0115 0.77 0.04 0.0115 0.2516 4.6 8.5 11.9 FALSE 24C30+C27 C30 28.53 23.63 C27 25 21.41 162.9 0.014 Circle 6 0.013 0.0073 0.57 0.01 0.0073 0.655 1.1 1.4 4.8 FALSE 23.657C31+C30 C31 29.09 23.76 C30 28.53 23.63 67.1 0.002 Circle 6 0.013 0.0014 0.53 0 0.0014 0.247 0.6 0.8 0.8 FALSE 23.764C32+C30 C32 30.12 24.36 C30 28.53 23.63 146.7 0.005 Circle 6 0.013 0.0059 0.56 0.01 0.0059 0.3958 1.5 1.3 1.3 FALSE 24.396C33+C32 C33 31.26 24.53 C32 30.12 24.39 70.7 0.002 Circle 6 0.013 0.0044 0.6 0.02 0.0044 0.2497 1.8 3.3 3.3 FALSE 24.554C34+C32 C34 30 24.5 C32 30.12 24.39 56.9 0.002 Circle 6 0.013 0.0015 0.53 0 0.0015 0.2467 0.6 0.9 0.9 FALSE 24.504C35+C7 C35 31.98 25.2 C7 34.43 23.65 403.4 0.004 Circle 6 0.013 0.025 0.69 0.01 0.025 0.3478 7.2 2.7 2.7 FALSE 25.239C36+C35 C36 32.58 25.7 C35 31.98 25.2 92 0.005 Circle 6 0.013 0.025 0.68 0.01 0.025 0.4136 6 2 2 FALSE 25.736C37+C36 C37 34.3 26.67 C36 32.58 25.73 153.2 0.006 Circle 6 0.013 0.005 0.56 0.01 0.005 0.4395 1.1 1.2 1.2 FALSE 26.706C39+C37 C39 33.37 27.03 C37 34.3 26.7 164.1 0.002 Circle 6 0.013 0.005 0.61 0.02 0.005 0.2516 2 3.5 4.9 FALSE 27.057C40+C36 C40 32.93 26.9 C36 32.58 25.83 257.5 0.004 Circle 6 0.013 0.02 0.91 0.06 0.02 0.3617 5.5 12.2 18.3 FALSE 26.987C41+C40 C41 33.56 27.26 C40 32.93 26.93 191.4 0.002 Circle 6 0.013 0.02 0.93 0.07 0.02 0.233 8.6 13.4 20.6 FALSE 27.365C42+C41 C42 34.21 27.91 C41 33.56 27.31 300.1 0.002 Circle 6 0.013 0.02 0.93 0.07 0.02 0.2509 8 13.2 19.9 FALSE 28.01C43+C8 C43 30.16 24.53 C8 29.93 24.33 101 0.002 Circle 6 0.013 0.001 0.52 0 0.001 0.2497 0.4 0.8 0.8 FALSE 24.535C44+C10 C44 32.45 26.73 C10 31.71 25.76 154.5 0.006 Circle 6 0.013 0.0189 0.65 0.01 0.0189 0.4446 4.3 2.4 13.5 FALSE 26.836C45+C44 C45 33.66 27.91 C44 32.45 26.77 166.1 0.007 Circle 6 0.013 0.0189 0.7 0.02 0.0189 0.4648 4.1 4.4 13.8 FALSE 27.981C46+C45 C46 36.3 29.85 C45 33.66 27.91 255.5 0.008 Circle 6 0.013 0.0189 0.91 0.06 0.0189 0.4889 3.9 12.8 14 FALSE 30.07C47+C46 C47 35.05 30.62 C46 36.3 30 309.1 0.002 Circle 6 0.013 0.0189 0.91 0.06 0.0189 0.2513 7.5 12.6 19 FALSE 30.715C48+C11 C48 43.08 29.1 C11 41.2 28.98 178.7 0.001 Circle 6 0.013 0.0248 0.71 0.02 0.0248 0.1454 17.1 3.3 3.3 FALSE 29.258C49+C48 C49 41.32 29.82 C48 43.08 29.1 247.7 0.003 Circle 6 0.013 0.0248 0.96 0.07 0.0248 0.3025 8.2 13.2 13.2 FALSE 29.932C50+C49 C50 40.78 30.68 C49 41.32 29.82 361.2 0.002 Circle 6 0.013 0.0248 0.95 0.07 0.0248 0.2738 9.1 13.2 13.2 FALSE 30.797C51+C50 C51 38.55 32.75 C50 40.78 30.68 556.1 0.004 Circle 6 0.013 0.0248 0.95 0.06 0.0248 0.3423 7.2 12.9 20.5 FALSE 32.853D1+E4 D1 17.33 6.83 E4 16.28 6.08 354.5 0.002 Circle 12 0.013 0.2054 1.53 0 0.431 1.6387 12.5 0 36.5 FALSE 7.197D2+D1 D2 17.54 6.91 D1 17.33 6.88 53.3 0.001 Circle 12 0.013 0.2054 1.53 0 0.4314 0.8452 24.3 0 36.1 FALSE 7.31D3+D2 D3 18.91 7.46 D2 17.54 6.99 363.3 0.001 Circle 12 0.013 0.2054 1.53 0 0.4334 1.2814 16 0 41.4 FALSE 8.054D4+D3 D4 19 8.15 D3 18.91 7.56 296.1 0.002 Circle 8 0.013 0.0595 0.86 0.01 0.1542 0.5394 11 2 41 FALSE 8.424D5+D4 D5 19 8.29 D4 19 8.15 69.6 0.002 Circle 8 0.013 0.0595 0.86 0.01 0.1542 0.5419 11 2 38.4 FALSE 8.562D6+D5 D6 19.87 13.77 D5 19 8.29 246.1 0.022 Circle 8 0.013 0.0324 0.72 0.01 0.0812 1.8031 1.8 1.6 16.9 FALSE 13.974D7+D6 D7 19.85 15.5 D6 19.87 13.82 398 0.004 Circle 8 0.013 0.0324 0.72 0.01 0.0812 0.7851 4.1 1.6 25.9 FALSE 15.675 Attachments.xlsx/Calibration ADWF Page 2 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
228
Attachement 1
Average Dry Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
D8+D7 D8 21.51 16.11 D7 19.85 15.5 157.8 0.004 Circle 6 0.013 0.0361 1.19 0.1 0.0488 0.3488 10.4 20.3 33.1 FALSE 16.278D9+D8 D9 27.55 21.3 D8 21.51 16.11 496 0.01 Circle 6 0.013 0.0299 1.08 0.1 0.0488 0.5739 5.2 19.8 25.8 FALSE 21.442D10+D3 D10 21.78 10.58 D3 18.91 7.81 489.1 0.006 Circle 10 0.013 0.1459 1.32 0.02 0.2843 1.6488 8.8 2.1 29.8 FALSE 10.83D16+D20 D16 23 13.91 D20 22 13 453.9 0.002 Circle 8 0.013 0.018 0.89 0.06 0.018 0.541 3.3 9 12.7 FALSE 13.998D17+D16 D17 23.1 14.18 D16 23 13.91 136.3 0.002 Circle 8 0.013 0.018 0.91 0.06 0.018 0.5378 3.3 9.5 12.5 FALSE 14.265D19+D10 D19 21.54 12.39 D10 21.78 10.63 48.1 0.037 Circle 8 0.013 0.1459 1.32 0.02 0.2861 2.3114 6.3 2.6 25.2 FALSE 12.999D20+D19 D20 22 13 D19 21.54 12.89 52.7 0.002 Circle 8 0.013 0.036 0.89 0.04 0.036 0.5521 6.5 6.4 20.3 FALSE 13.152D21+D19 D21 20.93 15.08 D19 21.54 12.84 390.8 0.006 Circle 8 0.013 0.1099 1.13 0.02 0.251 0.9148 12 2.4 38.4 FALSE 15.4D22+D21 D22 22.23 15.84 D21 20.93 15.13 149 0.005 Circle 6 0.013 0.1099 1.13 0.02 0.2516 0.3873 28.4 3.2 63.9 FALSE 16.171D23+D22 D23 22.62 16.12 D22 22.23 15.88 73.3 0.003 Circle 6 0.013 0.1099 1.13 0.02 0.1991 0.3211 34.2 3.2 60.7 FALSE 16.437D24+D23 D24 24.01 17.46 D23 22.62 16.12 349.8 0.004 Circle 6 0.013 0.1099 1.13 0.02 0.2029 0.3473 31.7 3.2 60.6 FALSE 17.767D25+D24 D25 24.45 18.45 D24 24.01 17.56 300.9 0.003 Circle 6 0.013 0.0348 0.73 0.01 0.0855 0.3051 11.4 2.2 43.4 FALSE 18.676D26+D25 D26 24.79 19.26 D25 24.45 18.5 156.7 0.005 Circle 6 0.013 0.0348 0.73 0.01 0.0857 0.3907 8.9 2.2 38 FALSE 19.461D27+D26 D27 26.68 20.86 D26 24.79 19.28 392.4 0.004 Circle 6 0.013 0 0 0 0.0622 0.356 0 0 35.7 FALSE 21.066D28+D27 D28 27.45 21.65 D27 26.68 20.9 81.1 0.009 Circle 6 0.013 0 0 0 0.0973 0.5396 0 0 33.2 FALSE 21.827D29+C37 D29 34.53 27.53 C37 34.3 26.7 129.5 0.006 Circle 6 0.013 0 0 0 0.0232 0.4492 0 0 20.7 FALSE 27.595D29+D28 D29 34.53 27.53 D28 27.45 21.67 465.5 0.013 Circle 6 0.013 0 0 0 0.1352 0.6295 0 0 37.7 FALSE 27.595D30+D26 D30 26.26 21.18 D26 24.79 19.29 436.5 0.004 Circle 6 0.013 0.0348 0.8 0.03 0.0348 0.3692 9.4 5.1 26.6 FALSE 21.468D31+D30 D31 26.68 21.76 D30 26.26 21.46 152.5 0.002 Circle 6 0.013 0.0124 0.8 0.05 0.0124 0.2489 5 9.4 12.7 FALSE 21.824D32+D30 D32 26.44 21.71 D30 26.26 21.46 126.2 0.002 Circle 6 0.013 0.0224 1.03 0.08 0.0224 0.2497 9 16.6 22.1 FALSE 21.821D33+D24 D33 28.14 19.34 D24 24.01 17.51 450.4 0.004 Circle 6 0.013 0.0448 0.78 0.01 0.1103 0.3576 12.5 2.4 44.4 FALSE 19.563D34+D33 D34 34.45 22.3 D33 28.14 19.34 293.3 0.01 Circle 6 0.013 0.0448 1.01 0.06 0.1103 0.5637 7.9 11.4 34.7 FALSE 22.491D35+D34 D35 33.56 22.51 D34 34.45 22.3 177.8 0.001 Circle 6 0.013 0.0448 1.16 0.09 0.1103 0.1928 23.2 17.4 60.6 FALSE 22.831D36+D35 D36 31.3 25.05 D35 33.56 22.56 250.8 0.01 Circle 6 0.013 0.0208 0.92 0.06 0.0515 0.5591 3.7 12.5 26.6 FALSE 25.195D37+D36 D37 31.11 26.01 D36 31.3 25.05 367.8 0.003 Circle 6 0.013 0.0216 0.94 0.09 0.0515 0.2866 7.5 17.4 37.6 FALSE 26.2D38+D37 D38 32 26.64 D37 31.11 26.16 237.7 0.002 Circle 6 0.013 0.0191 0.81 0.09 0.0307 0.2521 7.6 17.7 28.1 FALSE 26.787D39+D38 D39 32.14 26.81 D38 32 26.64 84.1 0.002 Circle 6 0.013 0.0257 0.83 0.11 0.0307 0.2523 10.2 21.4 27.7 FALSE 26.955D40+D37 D40 32 26.6 D37 31.11 26.21 193.6 0.002 Circle 6 0.013 0.0208 0.94 0.07 0.0208 0.2518 8.2 13.5 13.5 FALSE 26.704D41+D24 D41 31.35 25.75 D24 24.01 17.51 190.6 0.043 Circle 6 0.013 0.0304 0.71 0.01 0.0304 1.1666 2.6 2.1 11.5 FALSE 25.823D42+D41 D42 30 26 D41 31.35 25.8 100.2 0.002 Circle 6 0.013 0.004 0.61 0.02 0.004 0.2507 1.6 3.6 4.4 FALSE 26.022D43+D41 D43 32 26.89 D41 31.35 25.85 517.4 0.002 Circle 6 0.013 0.0264 1.07 0.09 0.0264 0.2516 10.5 17.6 17.6 FALSE 27.019D44+D43 D44 32 27.12 D43 32 26.89 113 0.002 Circle 6 0.013 0.0264 1 0.1 0.0264 0.2531 10.4 19.1 25.2 FALSE 27.247D47+D22 D47 20.69 17.09 D22 22.23 15.86 299.2 0.004 Circle 6 0.013 0.0413 1.1 0.12 0.0561 0.3597 11.5 24.5 33.8 FALSE 17.263D48+D47 D48 22.05 18.7 D47 20.69 17.09 401 0.004 Circle 6 0.013 0.0292 1.11 0.09 0.0561 0.3555 8.2 18.6 34.3 FALSE 18.873D49+D48 D49 27.59 21.99 D48 22.05 18.7 399.7 0.008 Circle 6 0.013 0.0383 1.07 0.08 0.056 0.509 7.5 15.1 28.6 FALSE 22.135D50+D49 D50 31.35 22.83 D49 27.59 21.99 421.6 0.002 Circle 6 0.013 0.0338 0.67 0.15 0.056 0.2504 13.5 30.3 41.7 FALSE 23.038D51+D7 D51 23.54 18.66 D7 19.85 15.5 457.8 0.007 Circle 6 0.013 0.0324 0.81 0.03 0.0324 0.4662 7 6.1 22.3 FALSE 18.775D52+D51 D52 27.31 20.31 D51 23.54 18.69 267 0.006 Circle 6 0.013 0.0216 0.83 0.05 0.0216 0.437 4.9 9.1 17.9 FALSE 20.398D53+D52 D53 29.62 21.22 D52 27.31 20.31 247.8 0.004 Circle 6 0.013 0.0108 0.77 0.04 0.0108 0.34 3.2 8.8 11.3 FALSE 21.296D54+D53 D54 29.68 21.68 D53 29.62 21.27 74.9 0.005 Circle 6 0.013 0.0108 0.68 0.02 0.0108 0.4151 2.6 4.9 8.8 FALSE 21.888D55+D54 D55 30.37 22.39 D54 29.68 21.88 252.3 0.002 Circle 6 0.013 0.0108 0.76 0.04 0.0108 0.2523 4.3 8.3 11.3 FALSE 22.446D56+D35 D56 35.05 23.65 D35 33.56 22.51 286.3 0.004 Circle 6 0.013 0.024 0.95 0.07 0.0588 0.354 6.8 13.4 34.5 FALSE 23.83D57+D56 D57 37.86 26.21 D56 35.05 23.7 197.1 0.013 Circle 6 0.013 0.024 0.73 0.02 0.0588 0.6332 3.8 4.4 26 FALSE 26.512D58+D57 D58 37.67 27.07 D57 37.86 26.36 158 0.004 Circle 6 0.013 0.024 0.86 0.05 0.0588 0.3761 6.4 9.4 33.6 FALSE 27.261D59+D58 D59 37.27 28.53 D58 37.67 27.12 151.4 0.009 Circle 6 0.013 0.024 0.78 0.03 0.0588 0.5415 4.4 6.2 28.2 FALSE 28.673D60+D59 D60 37.44 29.8 D59 37.27 28.57 112.6 0.011 Circle 6 0.013 0.024 0.81 0.04 0.024 0.5864 4.1 7.7 15.7 FALSE 29.934D61+D60 D61 37.37 30.05 D60 37.44 29.84 101 0.002 Circle 6 0.013 0.024 1.02 0.09 0.024 0.2558 9.4 17.7 22.9 FALSE 30.166D62+D59 D62 32.76 29.07 D59 37.27 28.57 247.7 0.002 Circle 6 0.013 0.0229 0.74 0.11 0.0348 0.2521 9.1 21.5 32.5 FALSE 29.233D63+D5 D63 19.63 8.6 D5 19 8.29 296.6 0.001 Circle 8 0.013 0.0271 0.97 0.07 0.073 0.3906 6.9 10 35.8 FALSE 8.841D64+D63 D64 24.68 17.38 D63 19.63 8.56 470.5 0.019 Circle 6 0.013 0.0263 0.68 0.01 0.035 0.7682 3.4 2 2.2 FALSE 17.497D65+D64 D65 28.98 20.08 D64 24.68 17.38 448 0.006 Circle 6 0.013 0.0242 1.05 0.09 0.035 0.4356 5.6 17.2 25 FALSE 20.205D66+D65 D66 29.37 20.96 D65 28.98 20.13 412.5 0.002 Circle 6 0.013 0.0222 0.74 0.11 0.035 0.2517 8.8 21 32.7 FALSE 21.124D67+D63 D67 18.77 12.39 D63 19.63 8.6 294.1 0.013 Circle 6 0.013 0.0271 0.89 0.05 0.0271 0.6369 4.3 10.2 16.8 FALSE 12.476D68+D67 D68 19 12.7 D67 18.77 12.42 138.9 0.002 Circle 6 0.013 0.0134 0.82 0.05 0.0134 0.2519 5.3 10.3 13.7 FALSE 12.769D69+D67 D69 19 12.94 D67 18.77 12.42 259 0.002 Circle 6 0.013 0.0137 0.82 0.05 0.0137 0.2514 5.4 10.1 14.1 FALSE 13.01D70+D51 D70 24 18.86 D51 23.54 18.72 70.8 0.002 Circle 6 0.013 0.0108 0.76 0.04 0.0108 0.2495 4.3 8.1 10.2 FALSE 18.916D71+D52 D71 28.07 22.62 D52 27.31 21.11 130 0.012 Circle 6 0.013 0.0108 0.62 0.01 0.0108 0.6047 1.8 2.5 7.3 FALSE 22.658D72+D20 D72 22.5 13.56 D20 22 13 279.6 0.002 Circle 8 0.013 0.018 0.87 0.06 0.018 0.5408 3.3 8.3 13.1 FALSE 13.646D73+D72 D73 23 14.16 D72 22.5 13.56 297.4 0.002 Circle 8 0.013 0.018 0.9 0.06 0.018 0.5427 3.3 9.2 13.2 FALSE 14.248D74+D73 D74 23.2 14.58 D73 23 14.16 210.2 0.002 Circle 8 0.013 0.018 0.86 0.05 0.0181 0.5401 3.3 8 11.4 FALSE 14.666E1+H9 E1 12.09 3.59 H9 11.84 3.14 269.8 0.002 Circle 12 0.013 0.4047 2.52 0 0.5952 1.455 27.8 0 45.4 FALSE 4.056E2+E1 E2 13.48 4.23 E1 12.09 3.64 283.2 0.002 Circle 12 0.013 0.2054 1.59 0.01 0.429 1.6261 12.6 1.4 36.5 FALSE 4.607E3+E2 E3 15.11 4.76 E2 13.48 4.33 279.6 0.002 Circle 12 0.013 0.2054 1.63 0.02 0.4289 1.3971 14.7 2 39.3 FALSE 5.295E4+E3 E4 16.28 6.08 E3 15.11 5.01 356.7 0.003 Circle 12 0.013 0.2054 1.58 0.01 0.4299 1.9512 10.5 1 33.2 FALSE 6.414E6+E1 E6 11.14 4.84 E1 12.09 4.04 501 0.002 Circle 12 0.013 0.1994 1.5 0 0.1994 1.4236 14 0 0 FALSE 5.219E7+E6 E7 11.77 6.02 E6 11.14 4.84 310.5 0.004 Circle 8 0.013 0.1844 1.54 0.02 0.1844 0.7449 24.7 3.4 3.4 FALSE 6.255E8+E7 E8 13.72 6.77 E7 11.77 6.07 354.7 0.002 Circle 8 0.013 0.1544 1.48 0.04 0.1544 0.5368 28.8 6.3 6.3 FALSE 7.025E9+E8 E9 13.77 7.32 E8 13.72 6.82 341.1 0.001 Circle 12 0.013 0.1294 1.23 0.02 0.1294 1.364 9.5 1.7 1.7 FALSE 7.536E10+E9 E10 14.53 7.78 E9 13.77 7.32 192.1 0.002 Circle 12 0.013 0.1294 1.23 0.02 0.1294 1.7433 7.4 1.7 1.7 FALSE 7.972 Attachments.xlsx/Calibration ADWF Page 3 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
229
Attachement 1
Average Dry Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
E11+E10 E11 14.94 8.04 E10 14.53 7.93 194.9 0.001 Circle 12 0.013 0.1124 1.14 0.02 0.1124 0.8464 13.3 1.6 1.6 FALSE 8.281E12+E11 E12 20.13 9.13 E11 14.94 8.14 494.5 0.002 Circle 12 0.013 0.1124 1.14 0.02 0.1124 1.5941 7 1.6 1.6 FALSE 9.311E13+E12 E13 18.72 10 E12 20.13 9.18 450.3 0.002 Circle 8 0.013 0.0732 1.07 0.04 0.0732 0.5156 14.2 6.1 31.1 FALSE 10.21E14+E13 E14 17.24 10.39 E13 18.72 10.12 185.5 0.001 Circle 8 0.013 0.0608 0.87 0.01 0.0609 0.461 13.2 2 30.8 FALSE 10.598E15+E14 E15 15.27 10.72 E14 17.24 10.49 246.2 0.001 Circle 8 0.013 0.043 0.77 0.01 0.043 0.3693 11.6 1.8 31 FALSE 10.929E20+E7 E20 12.61 7.71 E7 11.77 6.12 504.5 0.003 Circle 6 0.013 0.015 0.78 0.04 0.015 0.315 4.8 8.3 13.7 FALSE 7.78E21+E20 E21 14.72 8.53 E20 12.61 7.76 385.6 0.002 Circle 6 0.013 0.015 0.83 0.05 0.015 0.2507 6 10.3 10.3 FALSE 8.606E22+E8 E22 15.38 8.48 E8 13.72 6.87 449.9 0.004 Circle 6 0.013 0.015 0.75 0.04 0.0151 0.3356 4.5 7 13.5 FALSE 8.551E23+E22 E23 16.82 10.42 E22 15.38 8.48 438.8 0.004 Circle 6 0.013 0.015 0.69 0.02 0.0151 0.3731 4 4.4 11.1 FALSE 10.484E25+E50 E25 16.75 10.9 E50 16.04 9.64 231.9 0.005 Circle 6 0.013 0.017 0.68 0.02 0.017 0.4136 4.1 4 11.9 FALSE 10.965E26+E25 E26 19.82 13.82 E25 16.75 10.9 488.2 0.006 Circle 6 0.013 0.017 0.87 0.06 0.0171 0.4339 3.9 11.6 13.5 FALSE 13.887E27+E12 E27 21.28 15.85 E12 20.13 9.53 576.2 0.011 Circle 6 0.013 0.0137 0.65 0.02 0.0137 0.5876 2.3 3.1 9.4 FALSE 15.9E28+E27 E28 22 15.93 E27 21.28 15.81 61.8 0.002 Circle 6 0.013 0.0137 0.81 0.05 0.0137 0.2472 5.5 9.5 12.1 FALSE 15.999E29+E12 E29 23.08 15.79 E12 20.13 9.58 247 0.025 Circle 6 0.013 0.0255 0.68 0.01 0.0255 0.8896 2.9 2 2 FALSE 15.839E30+E29 E30 27 20.5 E29 23.08 15.83 502.3 0.009 Circle 6 0.013 0.01 0.71 0.03 0.01 0.541 1.8 6.4 8 FALSE 20.538E31+E29 E31 27.93 20.63 E29 23.08 15.83 252.3 0.019 Circle 6 0.013 0.0155 0.84 0.05 0.0155 0.7739 2 10.6 10 FALSE 20.75E32+E31 E32 28 21.21 E31 27.93 20.68 263.2 0.002 Circle 6 0.013 0.0155 0.86 0.06 0.0155 0.2518 6.2 11.2 15.7 FALSE 21.289E33+E13 E33 21.41 15.78 E13 18.72 10.02 228.9 0.025 Circle 8 0.013 0.0124 0.6 0.01 0.0126 1.9168 0.6 1.2 5.6 FALSE 15.863E33+E29 E33 21.41 17.11 E29 23.08 15.86 455.1 0.003 Circle 6 0.013 0 0 0 0 0.2941 0 0 0 FALSE 15.863E34+E33 E34 24.94 18.94 E33 21.41 15.83 278.9 0.011 Circle 6 0.013 0.01 0.77 0.04 0.0101 0.5925 1.7 8.9 8.3 FALSE 18.983E35+E14 E35 19.06 11.41 E14 17.24 10.74 333 0.002 Circle 6 0.013 0.0178 0.89 0.06 0.0178 0.2517 7.1 12.1 18 FALSE 11.499E36+E15 E36 17.4 12.35 E15 15.27 10.82 420.2 0.004 Circle 6 0.013 0.04 0.79 0.02 0.04 0.3386 11.8 3.6 30.9 FALSE 12.512E37+E36 E37 18 13.11 E36 17.4 12.4 353.2 0.002 Circle 6 0.013 0.015 0.83 0.05 0.015 0.2516 6 10.4 15.1 FALSE 13.186E38+E36 E38 18.78 13.33 E36 17.4 12.35 233.6 0.004 Circle 6 0.013 0.025 0.68 0.01 0.025 0.3634 6.9 2 17.1 FALSE 13.432E39+E38 E39 19 14.13 E38 18.78 13.53 300.6 0.002 Circle 6 0.013 0.015 0.84 0.05 0.0151 0.2507 6 10.5 15.2 FALSE 14.206E40+E38 E40 22.91 14.25 E38 18.78 13.33 458.2 0.002 Circle 6 0.013 0.01 0.73 0.04 0.01 0.2514 4 7.3 10.4 FALSE 14.302E41+E15 E41 16 11.07 E15 15.27 10.87 98.3 0.002 Circle 6 0.013 0.003 0.54 0.01 0.003 0.2531 1.2 1.1 3.3 FALSE 11.087E42+E10 E42 14.56 10.06 E10 14.53 7.88 550.5 0.004 Circle 6 0.013 0 0 0 0.0091 0.3531 0 0 12.8 FALSE 10.117E44+E8 E44 12.57 8.62 E8 13.72 6.82 630.5 0.003 Circle 6 0.013 0.01 0.72 0.03 0.01 0.2998 3.3 6.6 9.8 FALSE 8.67E45+E44 E45 13.15 9.55 E44 12.57 8.57 319.4 0.003 Circle 6 0.013 0.01 0.76 0.04 0.01 0.3108 3.2 8.5 10.9 FALSE 9.598E46+E7 E46 11 7.4 E7 11.77 6.02 500.5 0.003 Circle 6 0.013 0.015 0.79 0.04 0.015 0.2946 5.1 8.7 14 FALSE 7.472E47+E46 E47 11.54 8.31 E46 11 7.4 455.2 0.002 Circle 6 0.013 0.015 0.84 0.05 0.015 0.2509 6 10.5 15.2 FALSE 8.386E48+E6 E48 11.94 7.54 E6 11.14 5.19 498.5 0.005 Circle 8 0.013 0.015 0.77 0.04 0.015 0.8296 1.8 6 9 FALSE 7.598E49+E48 E49 11.53 8.46 E48 11.94 7.54 457.8 0.002 Circle 6 0.013 0.015 0.84 0.05 0.015 0.2515 6 10.5 15.2 FALSE 8.536E50+E10 E50 16.04 9.64 E10 14.53 7.88 217.9 0.008 Circle 6 0.013 0.017 0.66 0.01 0.017 0.5043 3.4 2.8 12.3 FALSE 9.71F7+T25 F7 4.65 0.3 T25 3.95 -2.2 477 0.005 Circle 8 0.013 0.064 0.89 0.01 0.0641 0.8748 7.3 2 22.8 FALSE 0.452F8+F7 F8 8.3 1.38 F7 4.65 0.3 356.7 0.003 Circle 8 0.013 0.064 0.89 0.01 0.0641 0.6649 9.6 2 26 FALSE 1.603F9+F23 F9 8.21 3.11 F23 8.23 2.7 110 0.004 Circle 6 0.013 0.047 0.8 0.01 0.0474 0.3425 13.7 2.4 33.2 FALSE 3.301F10+F9 F10 11.76 4.96 F9 8.21 3.21 462.6 0.004 Circle 6 0.013 0.047 0.8 0.01 0.0471 0.3451 13.6 2.4 33.2 FALSE 5.16F11+F10 F11 13 6.84 F10 11.76 5.06 419.8 0.004 Circle 6 0.013 0.047 0.88 0.03 0.0471 0.3654 12.9 5.8 31.9 FALSE 7.003F12+F11 F12 13 7.65 F11 13 6.94 355.2 0.002 Circle 6 0.013 0.032 1.03 0.07 0.032 0.2509 12.8 14.6 30.3 FALSE 7.804F13+F19 F13 15.24 10.24 F19 15.18 10.23 24.2 0 Circle 6 0.013 0.024 0.41 0.17 0.024 0.1141 21 33.9 39.6 FALSE 10.433F14+F8 F14 9.56 5.64 F8 8.3 1.76 463.1 0.008 Circle 6 0.013 0.003 0.54 0.01 0.003 0.5136 0.6 1.1 3.4 FALSE 5.656F15+F11 F15 13.27 7.77 F11 13 7.17 301.1 0.002 Circle 6 0.013 0.015 0.83 0.05 0.015 0.2505 6 10 15.5 FALSE 7.852F16+F15 F16 13.27 8.24 F15 13.27 7.77 238 0.002 Circle 6 0.013 0.015 0.79 0.04 0.0152 0.2493 6 8.7 13.2 FALSE 8.317F17+F22 F17 15.11 8.76 F22 13 8.39 130.3 0.003 Circle 6 0.013 0.032 1 0.07 0.032 0.299 10.7 13.5 27.3 FALSE 8.903F18+F17 F18 15.34 9.94 F17 15.11 8.89 197.5 0.005 Circle 6 0.013 0.004 0.55 0.01 0.004 0.4091 1 1.1 2.3 FALSE 9.957F19+F20 F19 15.18 10.33 F20 15.15 9.7 188.8 0.003 Circle 6 0.013 0.024 0.85 0.05 0.024 0.3241 7.4 9.4 18.5 FALSE 10.433F20+F17 F20 15.15 9.7 F17 15.11 8.86 281.2 0.003 Circle 6 0.013 0.028 1.04 0.08 0.028 0.3067 9.1 15.9 25.4 FALSE 9.826F21+F20 F21 15.15 10.38 F20 15.15 9.7 136.4 0.005 Circle 6 0.013 0.004 0.64 0.02 0.004 0.3962 1 5 9.1 FALSE 10.407F22+F12 F22 13 8.39 F12 13 7.65 158.8 0.005 Circle 6 0.013 0.032 0.83 0.03 0.032 0.383 8.4 6.8 22.8 FALSE 8.512F23+F8 F23 8.23 2.7 F8 8.3 1.48 327.4 0.004 Circle 8 0.013 0.061 0.87 0.01 0.0612 0.7376 8.3 2 24.6 FALSE 2.864F24+F23 F24 8.23 3.19 F23 8.23 2.7 98 0.005 Circle 6 0.013 0.014 0.71 0.03 0.014 0.3967 3.5 5.5 13.5 FALSE 3.254F25+F24 F25 8.73 3.77 F24 8.23 3.19 115 0.005 Circle 6 0.013 0.002 0.53 0 0.002 0.3985 0.5 0.9 0.9 FALSE 3.775F26+F25 F26 8.73 4.36 F25 8.73 3.77 118 0.005 Circle 6 0.013 0.002 0.53 0 0.002 0.3967 0.5 0.9 0.9 FALSE 4.365F27+F24 F27 8.73 3.78 F24 8.23 3.19 118 0.005 Circle 6 0.013 0.012 0.65 0.02 0.012 0.3967 3 3.7 9 FALSE 3.832F28+F27 F28 8.73 4.57 F27 8.73 3.78 158 0.005 Circle 6 0.013 0.012 0.65 0.02 0.012 0.3967 3 3.7 8.3 FALSE 4.619G2+G19 G2 4.2 0.05 G19 2.65 -0.76 154 0.005 Circle 6 0.013 0.0796 0.97 0.01 0.0797 0.4069 19.6 2.9 35.9 FALSE 0.295G3+G14 G3 7 1.85 G14 6.79 1.05 208.1 0.004 Circle 6 0.013 0.0566 0.85 0.01 0.0567 0.3479 16.3 2.6 34.3 FALSE 2.027G4+G3 G4 7.49 2.26 G3 7 1.95 212.7 0.001 Circle 6 0.013 0.0436 0.88 0.03 0.0437 0.2142 20.4 6.6 41.9 FALSE 2.476G6+G4 G6 10.75 5.12 G4 7.49 2.36 387.6 0.007 Circle 6 0.013 0.0318 0.8 0.03 0.0319 0.4735 6.7 5.5 22.2 FALSE 5.233G7+G6 G7 10.12 5.81 G6 10.75 5.22 294.7 0.002 Circle 6 0.013 0.0159 0.83 0.05 0.016 0.251 6.3 10.2 16.3 FALSE 5.892G8+G7 G8 10.83 6.45 G7 10.12 5.8 326.8 0.002 Circle 6 0.013 0.0159 0.86 0.06 0.0159 0.2502 6.4 11.1 16.3 FALSE 6.531G9+G6 G9 8.88 5.78 G6 10.75 5.2 290.8 0.002 Circle 6 0.013 0.0159 0.84 0.05 0.016 0.2506 6.3 10.2 16.3 FALSE 5.862G10+G9 G10 11.09 6.24 G9 8.88 5.78 270.6 0.002 Circle 6 0.013 0.0159 0.86 0.06 0.0159 0.2313 6.9 11.1 16.9 FALSE 6.349G11+G10 G11 11.78 6.87 G10 11.09 6.34 265.7 0.002 Circle 6 0.013 0.0159 0.86 0.06 0.016 0.2506 6.3 11.4 16.1 FALSE 6.951G12+G4 G12 8.32 3.02 G4 7.49 2.47 277 0.002 Circle 6 0.013 0.0118 0.78 0.05 0.0118 0.25 4.7 9 12.4 FALSE 3.081G13+G3 G13 8.34 2.8 G3 7 1.9 452.5 0.002 Circle 6 0.013 0.013 0.8 0.05 0.013 0.2502 5.2 9.3 13.4 FALSE 2.867G14+G17 G14 6.79 1.05 G17 5.65 0.6 151.1 0.003 Circle 6 0.013 0.0681 0.91 0.01 0.0682 0.3062 22.2 2.7 39.9 FALSE 1.253 Attachments.xlsx/Calibration ADWF Page 4 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
230
Attachement 1
Average Dry Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
G15+G14 G15 6.2 2.15 G14 6.79 1.05 214.7 0.005 Circle 6 0.013 0.0115 0.66 0.02 0.0115 0.4016 2.9 4.1 25.1 FALSE 2.239G16+G15 G16 6.21 3.21 G15 6.2 2.2 154.5 0.007 Circle 6 0.013 0.0115 0.64 0.02 0.0115 0.4536 2.5 3.3 8.8 FALSE 3.257G17+G2 G17 5.65 0.5 G2 4.2 0.15 143.7 0.002 Circle 6 0.013 0.0796 0.97 0.01 0.0797 0.2769 28.7 2.9 44.8 FALSE 0.74G18+G17 G18 5.86 1.15 G17 5.65 0.57 291.5 0.002 Circle 6 0.013 0.0115 0.78 0.04 0.0116 0.2503 4.6 8.9 12 FALSE 1.21G19+T23 G19 2.65 -0.76 T23 6.87 -2.3 290.9 0.005 Circle 6 0.013 0.091 1.03 0.02 0.0911 0.4082 22.3 3 38.5 FALSE -0.566G20+G19 G20 2.66 0.11 G19 2.65 -0.76 173.9 0.005 Circle 6 0.013 0.0114 0.6 0.01 0.0114 0.3969 2.9 1.9 21.2 FALSE 0.18G21+G20 G21 2.67 0.37 G20 2.66 0.11 51.4 0.005 Circle 6 0.013 0.0057 0.64 0.02 0.0057 0.399 1.4 4.3 5.3 FALSE 0.397G22+G20 G22 2.67 0.25 G20 2.66 0.11 71.7 0.002 Circle 6 0.013 0.0057 0.64 0.02 0.0057 0.2479 2.3 4.3 8 FALSE 0.281H2+I11 H2 7.99 0.59 I11 8.07 0.17 36.6 0.011 Circle 15 0.013 0.6282 3.69 0.01 0.8467 6.9196 9.1 0.8 24.1 FALSE 1.009H3+H2 H3 8.2 0.7 H2 7.99 0.64 30.8 0.002 Circle 15 0.013 0.6282 3.69 0.01 0.8467 2.851 22 0.8 32.4 FALSE 1.139H4+H3 H4 8.13 0.71 H3 8.2 0.7 7.1 0.001 Circle 15 0.013 0.4293 2.73 0.02 0.6198 2.4242 17.7 1.3 34.7 FALSE 1.141H5+H4 H5 8.95 0.95 H4 8.13 0.71 259.3 0.001 Circle 15 0.013 0.4293 2.81 0.03 0.6198 1.9652 21.8 2.6 37.5 FALSE 1.441H6+H5 H6 8.89 0.99 H5 8.95 0.95 9 0.004 Circle 12 0.013 0.4093 2.63 0.02 0.5998 2.3751 17.2 1.7 47.1 FALSE 1.443H7+H75 H7 10.51 1.76 H75 10.09 1.58 89.8 0.002 Circle 12 0.013 0.4093 2.59 0.01 0.5998 1.595 25.7 0.8 40.6 FALSE 2.189H8+H7 H8 10.95 2.05 H7 10.51 1.76 233.4 0.001 Circle 12 0.013 0.4093 2.62 0.02 0.5998 1.2558 32.6 1.5 47.3 FALSE 2.547H9+H73 H9 11.84 3.09 H73 11.36 2.56 246.2 0.002 Circle 12 0.013 0.4093 2.55 0 0.5998 1.653 24.8 0 42.7 FALSE 3.527H11+H64 H11 9.92 1.44 H64 9.05 0.99 198.2 0.002 Circle 8 0.013 0.1904 1.45 0 0.2184 0.5758 33.1 0 46.3 FALSE 1.756H12+H11 H12 10.15 2.2 H11 9.92 1.54 333.5 0.002 Circle 8 0.013 0.1616 1.31 0 0.1896 0.5375 30.1 0 45.1 FALSE 2.505H13+H12 H13 10.85 2.55 H12 10.15 2.3 107.9 0.002 Circle 8 0.013 0.1216 1.2 0.02 0.1496 0.5816 20.9 2.9 38.1 FALSE 2.845H14+H13 H14 11.02 3.54 H13 10.85 2.65 446.5 0.002 Circle 8 0.013 0.1216 1.3 0.04 0.1496 0.5395 22.5 5.7 40.3 FALSE 3.812H15+H62 H15 14.61 5.6 H62 12.95 4.64 201.4 0.005 Circle 8 0.013 0.1104 1.13 0.02 0.1384 0.8343 13.2 2.4 30.6 FALSE 5.89H16+H60 H16 14.43 6.48 H60 14.57 5.9 351.2 0.002 Circle 8 0.013 0.1104 1.18 0.03 0.1384 0.4911 22.5 4 41 FALSE 6.755H17+H57 H17 12.03 6.83 H57 14.21 6.69 396.8 0 Circle 8 0.013 0.1104 1.15 0.02 0.1353 0.227 48.6 3.1 55.7 FALSE 7.229H18+H5 H18 8.92 1.27 H5 8.95 1.25 7.9 0.003 Circle 8 0.013 0.02 0.65 0.01 0.02 0.608 3.3 1.4 27 FALSE 1.44H19+H18 H19 8.88 2.58 H18 8.92 1.27 386.9 0.003 Circle 8 0.013 0.02 0.71 0.02 0.02 0.7031 2.8 3.2 11.4 FALSE 2.662H20+H19 H20 9.1 3.65 H19 8.88 2.63 270.8 0.004 Circle 8 0.013 0.02 0.84 0.05 0.02 0.7416 2.7 7.1 13 FALSE 3.733H21+H56 H21 9.3 5.04 H56 9.2 4.75 143.8 0.002 Circle 6 0.013 0.005 0.6 0.02 0.005 0.252 2 3 5.2 FALSE 5.068H22+H21 H22 9.3 5.34 H21 9.3 5.04 151.4 0.002 Circle 6 0.013 0.005 0.61 0.02 0.005 0.2498 2 3.3 5.1 FALSE 5.368H23+H22 H23 9.4 6.15 H22 9.3 5.34 404.8 0.002 Circle 6 0.013 0.005 0.62 0.02 0.005 0.251 2 3.8 5.3 FALSE 6.177H24+H20 H24 10.14 5.82 H20 9.1 3.65 332.8 0.007 Circle 6 0.013 0.01 0.77 0.04 0.01 0.4531 2.2 8.9 8.5 FALSE 5.861H25+H11 H25 11.2 3.3 H11 9.92 1.7 378 0.004 Circle 6 0.013 0.0288 0.72 0.02 0.0288 0.365 7.9 3 21.8 FALSE 3.416H26+H25 H26 10.63 4.58 H25 11.2 3.3 412.5 0.003 Circle 6 0.013 0.0288 0.77 0.03 0.0288 0.3125 9.2 5 24.2 FALSE 4.707H27+H26 H27 11.38 5.66 H26 10.63 5.43 114.6 0.002 Circle 6 0.013 0.0096 0.75 0.04 0.0096 0.2514 3.8 7.9 7.9 FALSE 5.71H28+H50 H28 10.4 5.41 H50 10.13 5.03 191.6 0.002 Circle 6 0.013 0.0096 0.71 0.03 0.0096 0.2499 3.8 6.3 9.3 FALSE 5.461H29+H12 H29 12.43 5.83 H12 10.15 2.65 550.5 0.006 Circle 6 0.013 0.04 0.84 0.03 0.0401 0.4264 9.4 5.5 27.8 FALSE 5.972H30+H46 H30 11.57 7.74 H46 11.27 7.47 135.4 0.002 Circle 6 0.013 0.015 0.86 0.06 0.0151 0.2505 6 11.5 15.1 FALSE 7.816H31+H14 H31 13.28 4.5 H14 11.02 3.69 403.7 0.002 Circle 6 0.013 0.0066 0.66 0.02 0.0066 0.2513 2.6 4.9 7 FALSE 4.535H32+H17 H32 16.06 10.26 H17 12.03 6.88 549.9 0.006 Circle 6 0.013 0.011 0.72 0.03 0.034 0.4399 2.5 6.8 27.8 FALSE 10.38H33+H32 H33 20 11.29 H32 16.06 10.26 515 0.002 Circle 6 0.013 0.0229 0.74 0.11 0.034 0.2509 9.1 21.3 32 FALSE 11.45H34+H17 H34 12.74 7.69 H17 12.03 6.83 268.6 0.003 Circle 6 0.013 0.1104 1.43 0.08 0.1104 0.3175 34.8 15.2 15.2 FALSE 7.92H35+H34 H35 14.34 9.56 H34 12.74 7.69 321.9 0.006 Circle 6 0.013 0.1104 1.38 0.07 0.1104 0.4276 25.8 13.3 13.3 FALSE 9.757H36+H35 H36 15.37 9.87 H35 14.34 9.56 473.9 0.001 Circle 6 0.013 0.0867 1.45 0.1 0.0867 0.1435 60.4 20.5 67.2 FALSE 10.22H37+H36 H37 17.89 12.09 H36 15.37 9.87 370.1 0.006 Circle 6 0.013 0.0578 1.13 0.07 0.0579 0.4345 13.3 13.6 33.2 FALSE 12.247H38+E42 H38 17.69 11.79 E42 14.56 10.11 518.8 0.003 Circle 6 0.013 0 0 0 0.0091 0.3193 0 0 10.5 FALSE 11.91H38+H47 H38 17.69 11.79 H47 15.05 10.1 205.2 0.008 Circle 6 0.013 0.0237 0.75 0.03 0.0237 0.5092 4.7 5.2 5.2 FALSE 11.91H39+H38 H39 18 12.1 H38 17.69 11.84 131.9 0.002 Circle 6 0.013 0.0187 0.95 0.07 0.0187 0.2491 7.5 14.2 18.8 FALSE 12.194H40+H36 H40 22.17 15.97 H36 15.37 9.87 496.1 0.012 Circle 6 0.013 0.0289 0.7 0.01 0.0291 0.6222 4.6 2.1 17.9 FALSE 16.067H41+H40 H41 24.38 16.27 H40 22.17 15.97 150.4 0.002 Circle 6 0.013 0.0289 0.94 0.11 0.029 0.2506 11.5 21.3 27.6 FALSE 16.409H42+H37 H42 21.01 14.76 H37 17.89 12.19 387.7 0.007 Circle 6 0.013 0.0289 0.88 0.05 0.0291 0.4568 6.3 9.4 19.8 FALSE 14.867H43+H42 H43 22.12 16.57 H42 21.01 14.76 346.3 0.005 Circle 6 0.013 0.0289 1.1 0.1 0.0289 0.4056 7.1 19 23.6 FALSE 16.677H44+H37 H44 20.24 14.24 H37 17.89 12.14 272.4 0.008 Circle 6 0.013 0.0289 1.11 0.09 0.0291 0.4926 5.9 18.7 20.8 FALSE 14.341H45+H9 H45 12.4 3.93 H9 11.84 3.49 222.4 0.002 Circle 6 0.013 0.0046 0.57 0.01 0.0046 0.2496 1.8 1.7 3.2 FALSE 3.954H46+H52 H46 11.27 7.47 H52 12.58 6.18 360.9 0.004 Circle 6 0.013 0.015 0.78 0.04 0.0152 0.3354 4.5 8 12.6 FALSE 7.543H47+H35 H47 15.05 10.1 H35 14.34 9.62 192.4 0.002 Circle 6 0.013 0.0237 0.95 0.07 0.0237 0.2802 8.5 13.2 13.2 FALSE 10.182H48+H55 H48 9.12 6.64 H55 9.3 4.32 217.4 0.011 Circle 6 0.013 0.005 0.56 0.01 0.005 0.5796 0.9 1.2 3.6 FALSE 6.743H49+H48 H49 8.35 6.77 H48 9.12 6.72 32.6 0.002 Circle 6 0.013 0.005 0.56 0.01 0.005 0.2197 2.3 1.2 1.2 FALSE 6.783H50+H26 H50 10.13 5.03 H26 10.63 4.58 154.3 0.003 Circle 6 0.013 0.0192 0.71 0.02 0.0192 0.303 6.3 4.6 16.2 FALSE 5.121H51+H50 H51 10.5 6.35 H50 10.13 5.13 189.2 0.006 Circle 6 0.013 0.0096 0.61 0.01 0.0096 0.4505 2.1 2.3 7.9 FALSE 6.391H52+H29 H52 12.58 6.18 H29 12.43 5.83 94.4 0.004 Circle 6 0.013 0.04 0.89 0.04 0.0405 0.3416 11.7 7.6 31.4 FALSE 6.343H53+H52 H53 12.4 8.3 H52 12.58 6.23 233.2 0.009 Circle 6 0.013 0.025 0.84 0.04 0.025 0.5286 4.7 8.7 16.6 FALSE 8.384H54+H20 H54 9.2 4 H20 9.1 3.7 152.6 0.002 Circle 6 0.013 0.01 0.59 0.01 0.01 0.2488 4 1.5 10.3 FALSE 4.228H55+H54 H55 9.3 4.32 H54 9.2 4.22 50 0.002 Circle 6 0.013 0.01 0.59 0.01 0.01 0.2509 4 1.5 7.9 FALSE 4.375H56+H55 H56 9.2 4.75 H55 9.3 4.32 215.8 0.002 Circle 6 0.013 0.005 0.56 0.01 0.005 0.2505 2 1.2 3.8 FALSE 4.777H57+H16 H57 14.21 6.69 H16 14.43 6.48 40.5 0.005 Circle 8 0.013 0.1104 1.13 0.02 0.1384 0.8701 12.7 2.4 30.1 FALSE 6.898H58+H57 H58 15.13 7.62 H57 14.21 6.69 184.6 0.005 Circle 8 0.013 0 0 0 0 0.8577 0 0 0 FALSE 7.62H59+H58 H59 16.1 8.59 H58 15.13 7.62 194.6 0.005 Circle 8 0.013 0 0 0 0 0.8531 0 0 0 FALSE 8.59H59+H61 H59 16.1 8.59 H61 15.42 6.28 194.6 0.012 Circle 8 0.013 0 0 0 0 1.3165 0 0 0 FALSE 8.59H60+H15 H60 14.57 5.9 H15 14.61 5.7 98.7 0.002 Circle 8 0.013 0.1104 1.22 0.03 0.1384 0.5439 20.3 5 37.7 FALSE 6.162H61+H60 H61 15.42 6.28 H60 14.57 5.9 189.5 0.002 Circle 8 0.013 0 0 0 0 0.5411 0 0 0 FALSE 6.28 Attachments.xlsx/Calibration ADWF Page 5 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
231
Attachement 1
Average Dry Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
H62+H14 H62 12.95 4.64 H14 11.02 3.54 232.8 0.005 Circle 8 0.013 0.115 1.16 0.02 0.143 0.8306 13.8 2.4 31 FALSE 4.852H63+H62 H63 13.79 5.49 H62 12.95 4.64 169.8 0.005 Circle 6 0.013 0.0046 0.55 0.01 0.0046 0.397 1.2 1.2 19.1 FALSE 5.539H64+H71 H64 9.05 0.99 H71 8.35 0.77 160.6 0.001 Circle 8 0.013 0.1979 1.49 0 0.2259 0.4472 44.3 0 51.9 FALSE 1.355H65+H64 H65 9.89 1.83 H64 9.05 0.99 168.3 0.005 Circle 6 0.013 0.0075 0.57 0.01 0.0076 0.3964 1.9 1.4 14.3 FALSE 1.888H66+H65 H66 9.89 2.09 H65 9.89 1.83 51.4 0.005 Circle 6 0.013 0.0075 0.57 0.01 0.0075 0.399 1.9 1.4 6.7 FALSE 2.129H67+H66 H67 9.89 2.32 H66 9.89 2.09 46 0.005 Circle 6 0.013 0.0025 0.54 0 0.0025 0.3967 0.6 1 1 FALSE 2.325H68+H66 H68 9.89 2.42 H66 9.89 2.09 67 0.005 Circle 6 0.013 0.005 0.56 0.01 0.005 0.3938 1.3 1.2 4.8 FALSE 2.448H69+H68 H69 9.89 2.64 H68 9.89 2.42 45.6 0.005 Circle 6 0.013 0.0025 0.54 0 0.0025 0.3897 0.6 1 1 FALSE 2.645H70+H68 H70 9.89 2.67 H68 9.89 2.42 51.2 0.005 Circle 6 0.013 0.0025 0.54 0 0.0025 0.3921 0.6 1 1 FALSE 2.675H71+H3 H71 8.35 0.77 H3 8.2 0.7 35 0.002 Circle 8 0.013 0.1989 1.49 0 0.2269 0.5404 36.8 0 60.5 FALSE 1.139H72+H71 H72 9.26 1.54 H71 8.35 0.77 182.4 0.004 Circle 6 0.013 0.001 0.52 0 0.001 0.3645 0.3 0.8 0.8 FALSE 1.544H73+H74 H73 11.36 2.56 H74 11.16 2.34 101 0.002 Circle 12 0.013 0.4093 2.55 0 0.5998 1.6627 24.6 0.1 40.5 FALSE 2.984H74+H8 H74 11.16 2.34 H8 10.95 2.1 112.9 0.002 Circle 12 0.013 0.4093 2.56 0 0.5998 1.6426 24.9 0.2 41.1 FALSE 2.768H75+H6 H75 10.09 1.58 H6 8.89 1.04 259.7 0.002 Circle 12 0.013 0.4093 2.61 0.01 0.5998 1.6245 25.2 1.3 43.2 FALSE 2.016I3+T19 I3 1.69 -3.99 T19 2.23 -4.27 188.4 0.001 Circle 18 0.013 0.7435 4.3 0.02 1.2176 4.0493 18.4 1.1 35.9 FALSE -3.425I4+I3 I4 1.84 -3.79 I3 1.69 -3.99 242.6 0.001 Circle 18 0.013 0.7435 4.22 0 1.2176 3.0159 24.7 0 39.7 FALSE -3.151I5+I31 I5 3.41 -3.42 I31 2.94 -3.53 135 0.001 Circle 18 0.013 0.7375 4.19 0 1.2116 2.9983 24.6 0 40.7 FALSE -2.793I6+I5 I6 4.62 -3.08 I5 3.41 -3.42 410.7 0.001 Circle 18 0.013 0.7375 4.19 0 1.2116 3.0222 24.4 0 42.2 FALSE -2.417I7+I6 I7 5.18 -2.32 I6 4.62 -3.08 259 0.003 Circle 18 0.013 0.6452 3.73 0 0.8637 5.6899 11.3 0 26.9 FALSE -1.91I8+I7 I8 6.15 -1.45 I7 5.18 -2.32 238.1 0.004 Circle 15 0.013 0.6372 3.69 0 0.8557 3.9046 16.3 0 32.5 FALSE -1.036I9+I8 I9 5.69 -1.31 I8 6.15 -1.45 154.7 0.001 Circle 15 0.013 0.6322 3.78 0.02 0.8507 1.9432 32.5 1.8 40.3 FALSE -0.758I10+I9 I10 7.26 -0.74 I9 5.69 -1.31 221.1 0.003 Circle 15 0.013 0.6282 3.64 0 0.8467 3.2797 19.2 0 35.4 FALSE -0.295I11+I10 I11 8.07 -0.03 I10 7.26 -0.74 379.8 0.002 Circle 15 0.013 0.6282 3.74 0.02 0.8467 2.7928 22.5 1.6 38.5 FALSE 0.47I12+I6 I12 4.46 -2.19 I6 4.62 -2.83 338.5 0.002 Circle 12 0.013 0.0873 1.01 0.01 0.3429 1.5491 5.6 1.5 33.7 FALSE -1.852I13+I12 I13 5.54 -1.56 I12 4.46 -2.14 319.8 0.002 Circle 12 0.013 0.0873 1.01 0.01 0.3429 1.5172 5.8 1.5 34 FALSE -1.216I14+I13 I14 4.22 -0.83 I13 5.54 -1.51 443.5 0.002 Circle 12 0.013 0.0025 0.54 0 0.2581 1.395 0.2 0.5 31.1 FALSE -0.518I15+I14 I15 5.32 -0.53 I14 4.22 -0.78 386 0.001 Circle 12 0.013 0.0025 0.54 0 0.2582 0.9067 0.3 0.5 37.5 FALSE -0.143I16+I6 I16 4.85 0.96 I6 4.62 -2.38 492.8 0.007 Circle 6 0.013 0.005 0.64 0.02 0.005 0.4619 1.1 4.6 4.9 FALSE 0.984I17+I7 I17 5.54 1.51 I7 5.18 -1.27 525.8 0.005 Circle 6 0.013 0.008 0.7 0.03 0.008 0.408 2 6.3 8.1 FALSE 1.545I18+I8 I18 5.2 1.01 I8 6.15 -0.65 236.8 0.007 Circle 6 0.013 0.005 0.56 0.01 0.005 0.4698 1.1 1.2 4.3 FALSE 1.116I19+I18 I19 6.48 1.59 I18 5.2 1.11 238.8 0.002 Circle 6 0.013 0.005 0.56 0.01 0.005 0.2516 2 1.5 3.2 FALSE 1.616I20+I9 I20 5.86 1.26 I9 5.69 -0.81 278.4 0.007 Circle 6 0.013 0.004 0.63 0.02 0.0041 0.4838 0.8 4.4 3.4 FALSE 1.281I21+I24 I21 7.17 1.52 I24 7 -0.08 364.1 0.004 Circle 6 0.013 0.0636 0.95 0.03 0.0636 0.3719 17.1 5.2 5.2 FALSE 1.697I22+I23 I22 8.69 3.44 I23 8.52 3.17 44.5 0.006 Circle 6 0.013 0.0212 0.9 0.06 0.0212 0.437 4.9 11.6 16.1 FALSE 3.521I23+I27 I23 8.52 3.12 I27 8.3 2.86 80.1 0.003 Circle 6 0.013 0.0424 1.09 0.08 0.0424 0.3197 13.3 15 33.5 FALSE 3.29I24+I13 I24 7 -0.08 I13 5.54 -0.56 236.9 0.002 Circle 6 0.013 0.0848 1.25 0.06 0.0848 0.2526 33.6 12.9 12.9 FALSE 0.165I25+I24 I25 7 0.22 I24 7 -0.08 153.5 0.002 Circle 6 0.013 0.0212 0.98 0.08 0.0212 0.248 8.5 15.2 20.9 FALSE 0.326I26+I23 I26 9.29 4.04 I23 8.52 3.27 153.5 0.005 Circle 6 0.013 0.0212 0.77 0.03 0.0212 0.3974 5.3 6.6 14.7 FALSE 4.123I27+I28 I27 8.3 2.86 I28 8.04 2.57 89.9 0.003 Circle 6 0.013 0.0424 0.97 0.05 0.0424 0.3187 13.3 10.5 10.5 FALSE 3.029I28+I21 I28 8.04 2.57 I21 7.17 1.57 311.5 0.003 Circle 6 0.013 0.0636 1.23 0.08 0.0636 0.3179 20 16.5 38.4 FALSE 2.763I29+I28 I29 8.81 3.34 I28 8.04 2.57 153.5 0.005 Circle 6 0.013 0.0212 0.91 0.06 0.0212 0.3974 5.3 12 22.1 FALSE 3.431I31+I4 I31 2.94 -3.53 I4 1.84 -3.79 321.1 0.001 Circle 18 0.013 0.7435 4.22 0 1.2176 2.9889 24.9 0 41.8 FALSE -2.866I32+I31 I32 3.97 -2.18 I31 2.94 -3.26 207.6 0.005 Circle 6 0.013 0.006 0.56 0.01 0.0061 0.4047 1.5 1.3 22.8 FALSE -2.102I33+I32 I33 4.43 -1.73 I32 3.97 -2.18 90.2 0.005 Circle 6 0.013 0.002 0.53 0 0.002 0.3963 0.5 0.9 0.9 FALSE -1.725I34+I32 I34 4.56 -1.6 I32 3.97 -2.18 117.2 0.005 Circle 6 0.013 0.004 0.57 0.01 0.0041 0.3947 1 1.9 3.5 FALSE -1.579I43+I15 I43 5.62 0.12 I15 5.32 -0.53 61.7 0.011 Circle 12 0.013 0.0025 0.54 0 0.2604 3.6566 0.1 0.5 19.3 FALSE 0.451J5+T21 J5 4.44 -1.06 T21 3.07 -3.03 585.4 0.003 Circle 6 0.013 0.0417 0.77 0.01 0.0417 0.3255 12.8 2.4 33 FALSE -0.894J6+J5 J6 5.85 0.6 J5 4.44 -0.96 558.5 0.003 Circle 6 0.013 0.0417 0.8 0.02 0.0417 0.2965 14.1 3.6 34.7 FALSE 0.775J7+J6 J7 5.96 1.9 J6 5.85 1.02 441.1 0.002 Circle 6 0.013 0.0133 0.8 0.05 0.0133 0.2506 5.3 9.4 13.6 FALSE 1.968J8+J6 J8 7.5 2.81 J6 5.85 0.7 442.1 0.005 Circle 6 0.013 0.0284 0.85 0.04 0.0284 0.3876 7.3 8.2 20.7 FALSE 2.92J9+J8 J9 8.19 3.23 J8 7.5 2.81 400.5 0.001 Circle 6 0.013 0.0284 1.04 0.1 0.0284 0.1817 15.6 19.6 19.6 FALSE 3.397J10+J9 J10 9.91 4.26 J9 8.19 3.34 299.8 0.003 Circle 6 0.013 0.0284 1.04 0.08 0.0284 0.3108 9.1 16 25.1 FALSE 4.383J11+T20 J11 1.31 -2.3 T20 2.72 -3.58 282.4 0.005 Circle 8 0.013 0.0145 0.8 0.04 0.0145 0.8135 1.8 6.7 9.7 FALSE -2.192J12+J11 J12 1.94 -1.61 J11 1.31 -2.2 299.4 0.002 Circle 8 0.013 0.0145 0.8 0.05 0.0145 0.5364 2.7 6.9 10.8 FALSE -1.502J13+J12 J13 2.73 -0.51 J12 1.94 -1.51 298.6 0.003 Circle 8 0.013 0.0145 0.85 0.06 0.0145 0.6993 2.1 8.4 10.3 FALSE -0.402J14+J13 J14 3.27 -0.03 J13 2.73 -0.41 190 0.002 Circle 8 0.013 0.0145 0.8 0.05 0.0145 0.5404 2.7 6.8 9.8 FALSE 0.041K1+T15 K1 2.02 -6.28 T15 2.75 -6.5 20.4 0.011 Circle 14 0.013 0.3785 2.39 0 0.3785 5.5807 6.8 0 0 FALSE -6.05K2+K1 K2 3.35 -5.2 K1 2.02 -6.28 451.1 0.002 Circle 14 0.013 0.3785 2.46 0.01 0.3785 2.6295 14.4 1.2 1.2 FALSE -4.914K3+K2 K3 4.05 -4.8 K2 3.35 -5.2 189.7 0.002 Circle 12 0.013 0.3785 2.39 0 0.3785 1.6359 23.1 0 0 FALSE -4.484K4+K3 K4 3.55 -4.1 K3 4.05 -4.8 238.3 0.003 Circle 12 0.013 0.3765 2.38 0 0.3765 1.9309 19.5 0 0 FALSE -3.814K5+K4 K5 3.31 -3.39 K4 3.55 -4.1 248.1 0.003 Circle 12 0.013 0.1743 1.37 0 0.1743 1.9058 9.1 0 0 FALSE -3.205K6+K5 K6 4.44 -2.86 K5 3.31 -3.39 251.1 0.002 Circle 12 0.013 0.1606 1.3 0 0.1606 1.6368 9.8 0 0 FALSE -2.669K7+K6 K7 3.35 -1.85 K6 4.44 -2.66 362.1 0.002 Circle 8 0.013 0.0076 0.57 0.01 0.0076 0.5715 1.3 1 5.8 FALSE -1.809K8+K7 K8 2.87 -1.18 K7 3.35 -1.85 355.5 0.002 Circle 8 0.013 0.0076 0.57 0.01 0.0076 0.5246 1.4 1 1 FALSE -1.138K9+K8 K9 3.87 -0.58 K8 2.87 -1.18 355.9 0.002 Circle 8 0.013 0.0076 0.57 0.01 0.0076 0.4961 1.5 1 6.4 FALSE -0.475K10+K9 K10 4.11 0.11 K9 3.87 -0.48 155.5 0.004 Circle 6 0.013 0.0046 0.55 0.01 0.0046 0.3456 1.3 1.2 2.5 FALSE 0.131K11+K5 K11 3.67 -2.23 K5 3.31 -2.99 369.8 0.002 Circle 6 0.013 0.0077 0.64 0.02 0.0077 0.2544 3 4 4 FALSE -2.073K12+K11 K12 3.54 -0.86 K11 3.67 -2.08 353.5 0.003 Circle 6 0.013 0.0077 0.63 0.02 0.0078 0.3296 2.4 3.5 6.5 FALSE -0.821K13+K12 K13 2.97 0.27 K12 3.54 -0.86 362 0.003 Circle 6 0.013 0.0077 0.65 0.02 0.0078 0.3135 2.5 4.3 6.8 FALSE 0.309 Attachments.xlsx/Calibration ADWF Page 6 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
232
Attachement 1
Average Dry Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
K14+K13 K14 3.19 0.45 K13 2.97 0.27 90.4 0.002 Circle 6 0.013 0.0077 0.7 0.03 0.0078 0.2504 3.1 6.5 8.1 FALSE 0.491K15+K9 K15 3.43 -0.33 K9 3.87 -0.48 73.9 0.002 Circle 6 0.013 0.003 0.54 0.01 0.003 0.2528 1.2 1.1 2.9 FALSE -0.313K16+K4 K16 3.55 -2.65 K4 3.55 -3.45 273.7 0.003 Circle 6 0.013 0.008 0.77 0.05 0.008 0.3033 2.6 9 9 FALSE -2.593K17+K16 K17 2.92 -1.88 K16 3.55 -2.6 267.2 0.003 Circle 6 0.013 0.0062 0.71 0.04 0.0062 0.2913 2.1 7 7.6 FALSE -1.846K18+K17 K18 3.64 -1.31 K17 2.92 -1.88 268.7 0.002 Circle 6 0.013 0.0062 0.68 0.03 0.0062 0.2584 2.4 5.9 7.2 FALSE -1.276K19+K18 K19 3.25 -0.65 K18 3.64 -1.31 272 0.002 Circle 6 0.013 0.0062 0.67 0.03 0.0062 0.2764 2.2 5.7 7.4 FALSE -0.593K20+K19 K20 2.67 -0.53 K19 3.25 -0.6 134.6 0.001 Circle 6 0.013 0.0062 0.56 0.01 0.0062 0.128 4.8 1.3 1.3 FALSE -0.504K21+K3 K21 3.15 -2.1 K3 4.05 -4.25 246.4 0.009 Circle 6 0.013 0.002 0.53 0 0.002 0.5241 0.4 0.9 0.9 FALSE -2.046K22+K21 K22 3.29 -1.16 K21 3.15 -2.05 256.2 0.003 Circle 6 0.013 0.001 0.52 0 0.001 0.3307 0.3 0.8 0.8 FALSE -1.106K23+K22 K23 3.52 -0.91 K22 3.29 -1.11 99.5 0.002 Circle 6 0.013 0.001 0.52 0 0.001 0.2516 0.4 0.8 0.8 FALSE -0.906K24+K21 K24 3.55 -1.7 K21 3.15 -2 148.6 0.002 Circle 6 0.013 0.001 0.52 0 0.001 0.2521 0.4 0.8 0.8 FALSE -1.696K25+K5 K25 3.6 -1.7 K5 3.31 -3.09 376.2 0.004 Circle 6 0.013 0.006 0.59 0.01 0.006 0.3411 1.8 2.6 4.7 FALSE -1.669K26+K6 K26 4.36 -1.29 K6 4.44 -2.76 293.6 0.005 Circle 6 0.013 0.0208 0.51 0.13 0.0208 0.397 5.2 25.9 25.9 FALSE -1.184K27+K26 K27 3.95 -0.6 K26 4.36 -1.29 199.5 0.003 Circle 6 0.013 0 0 0 0 0.33 0 0 0 FALSE -0.55K28+K4 K28 3.27 -4 K4 3.55 -4.1 242 0 Circle 10 0.013 0.196 1.48 0 0.196 0.4454 44 0 0 FALSE -3.611K30+K31 K30 3.78 -3.21 K31 3.08 -3.43 108.2 0.002 Circle 8 0.013 0.028 0.69 0.01 0.028 0.5449 5.1 1.6 18.3 FALSE -3.087K31+L1 K31 3.08 -3.43 L1 2.82 -3.73 147.8 0.002 Circle 8 0.013 0.028 0.69 0.01 0.028 0.5444 5.1 1.6 27.4 FALSE -3.307K32+K30 K32 3.16 -2.76 K30 3.78 -3.21 226.9 0.002 Circle 8 0.013 0.028 0.69 0.01 0.028 0.5381 5.2 1.6 17.4 FALSE -2.635K33+K32 K33 2.74 -2.37 K32 3.16 -2.76 130.8 0.003 Circle 6 0.013 0.011 0.67 0.02 0.011 0.3064 3.6 4.8 9.6 FALSE -2.316K34+K33 K34 3.08 -1.54 K33 2.74 -2.37 278.4 0.003 Circle 6 0.013 0.011 0.77 0.04 0.011 0.3064 3.6 8.7 11.9 FALSE -1.485K35+K34 K35 2.78 -0.7 K34 3.08 -1.54 279.8 0.003 Circle 6 0.013 0.011 0.79 0.05 0.011 0.3074 3.6 9.5 12 FALSE -0.645K36+K35 K36 2.75 0.15 K35 2.78 -0.7 281.5 0.003 Circle 6 0.013 0.011 0.79 0.05 0.0111 0.3083 3.6 9.5 11.9 FALSE 0.204K37+K32 K37 2.51 -1.01 K32 3.16 -2.76 350.2 0.005 Circle 6 0.013 0.017 0.83 0.05 0.017 0.3966 4.3 9.7 14.4 FALSE -0.941L1+L21 L1 2.82 -3.73 L21 2.74 -3.95 223.2 0.001 Circle 10 0.013 0.196 1.65 0.03 0.196 0.6878 28.5 4 4 FALSE -3.398L2+L1 L2 2.72 -3.28 L1 2.82 -3.73 178.7 0.003 Circle 10 0.013 0.168 1.39 0.01 0.168 1.0994 15.3 1.1 1.1 FALSE -3.037L3+L2 L3 2.93 -3.17 L2 2.72 -3.28 83.4 0.001 Circle 10 0.013 0.168 1.45 0.02 0.168 0.7957 21.1 2.5 2.5 FALSE -2.89L4+L3 L4 3.39 -2.3 L3 2.93 -3.12 247.6 0.003 Circle 10 0.013 0.1123 1.15 0.02 0.1123 1.2608 8.9 2.1 2.1 FALSE -2.106L5+L47 L5 4.17 -1.38 L47 3.21 -2.04 276.3 0.002 Circle 6 0.013 0.021 0.87 0.05 0.021 0.2742 7.7 10.8 19.7 FALSE -1.278L6+L5 L6 4.69 -0.51 L5 4.17 -1.38 214.9 0.004 Circle 6 0.013 0.015 0.65 0.02 0.015 0.357 4.2 3.1 9.2 FALSE -0.45L7+L6 L7 5.31 -0.39 L6 4.69 -0.51 260.6 0 Circle 6 0.013 0.015 0.88 0.06 0.015 0.1204 12.5 12 17.3 FALSE -0.281L8+L7 L8 5.39 -0.24 L7 5.31 -0.39 72.8 0.002 Circle 6 0.013 0.015 0.86 0.06 0.015 0.2547 5.9 11.4 14.2 FALSE -0.165L9+L4 L9 3.42 -1.78 L4 3.39 -2.05 162.3 0.002 Circle 6 0.013 0.0409 0.92 0.04 0.0409 0.2288 17.9 8.7 8.7 FALSE -1.58L10+K27 L10 3.59 0.24 K27 3.95 -0.55 197.2 0.004 Circle 6 0.013 0 0 0 0 0.3551 0 0 0 FALSE -0.552L10+L9 L10 3.59 -0.76 L9 3.42 -1.78 274.7 0.004 Circle 6 0.013 0.01 0.78 0.05 0.01 0.3419 2.9 9.4 9.4 FALSE -0.552L11+L10 L11 4.97 0.57 L10 3.59 -0.56 359.8 0.003 Circle 6 0.013 0.01 0.69 0.03 0.01 0.3144 3.2 5.5 8.9 FALSE 0.619L12+L11 L12 4.97 0.62 L11 4.97 0.57 81.8 0.001 Circle 6 0.013 0.01 0.6 0.01 0.01 0.1387 7.2 2.1 4.8 FALSE 0.653L13+L9 L13 4.47 -0.58 L9 3.42 -1.73 310.9 0.004 Circle 6 0.013 0.0309 0.71 0.01 0.0309 0.3412 9.1 2.1 26.1 FALSE -0.454L14+L13 L14 5.25 0.6 L13 4.47 -0.58 301.6 0.004 Circle 6 0.013 0.0309 0.71 0.01 0.0309 0.351 8.8 2.1 25.8 FALSE 0.724L15+L14 L15 6.17 1.92 L14 5.25 0.6 310.2 0.004 Circle 6 0.013 0.0309 0.86 0.04 0.0309 0.366 8.4 8.4 25.4 FALSE 2.042L16+L15 L16 7.37 2.67 L15 6.17 1.92 311.1 0.002 Circle 6 0.013 0.0309 1.06 0.08 0.0309 0.2755 11.2 16.2 28.2 FALSE 2.814L17+L16 L17 7.38 3.53 L16 7.37 2.67 236.3 0.004 Circle 6 0.013 0.0294 0.79 0.03 0.0294 0.3385 8.7 5.8 20.2 FALSE 3.647L18+L17 L18 8.22 4.37 L17 7.38 3.53 330.9 0.003 Circle 6 0.013 0.0294 1.1 0.09 0.0294 0.2827 10.4 18.2 27 FALSE 4.507L19+L18 L19 9.56 5.51 L18 8.22 4.37 332.7 0.003 Circle 6 0.013 0.0294 1.09 0.09 0.0295 0.3284 9 17.6 25.3 FALSE 5.633L20+L16 L20 8.52 2.97 L16 7.37 2.77 101.4 0.002 Circle 6 0.013 0.0015 0.53 0 0.0015 0.2492 0.6 0.9 0.9 FALSE 2.974L21+K28 L21 2.74 -3.95 K28 3.27 -4 68.3 0.001 Circle 10 0.013 0.196 1.5 0 0.196 0.5928 33.1 0.6 0.6 FALSE -3.611L22+L3 L22 3.32 -0.13 L3 2.93 -2.72 365.6 0.007 Circle 6 0.013 0.013 0.71 0.03 0.013 0.4722 2.8 5.7 9.8 FALSE -0.078L23+L3 L23 3.05 -2.75 L3 2.93 -3.02 351.1 0.001 Circle 8 0.013 0.0427 0.77 0.01 0.0427 0.3351 12.7 1.8 32.5 FALSE -2.531L24+L23 L24 2.38 -2.17 L23 3.05 -2.75 386.3 0.002 Circle 8 0.013 0.0427 0.77 0.01 0.0427 0.4682 9.1 1.8 27.5 FALSE -1.986L25+L24 L25 3.54 -1.91 L24 2.38 -2.17 342 0.001 Circle 8 0.013 0.0427 0.77 0.01 0.0427 0.3332 12.8 1.8 32.5 FALSE -1.69L26+L25 L26 3.77 -1.38 L25 3.54 -1.91 215.6 0.002 Circle 8 0.013 0.037 0.74 0.01 0.037 0.5991 6.2 1.7 20.6 FALSE -1.231L27+L26 L27 3.7 -0.86 L26 3.77 -1.38 260.1 0.002 Circle 8 0.013 0.028 0.87 0.05 0.028 0.5403 5.2 6.9 18.6 FALSE -0.735L28+L27 L28 3.81 0.26 L27 3.7 -0.86 362.9 0.003 Circle 6 0.013 0.014 0.73 0.03 0.014 0.3117 4.5 6.4 12.3 FALSE 0.326L29+L28 L29 4.59 1.14 L28 3.81 0.26 366 0.002 Circle 6 0.013 0.014 0.79 0.04 0.014 0.2751 5.1 9 13.5 FALSE 1.209L30+L27 L30 3.71 -0.19 L27 3.7 -0.86 236 0.003 Circle 6 0.013 0.014 0.69 0.02 0.014 0.299 4.7 4.8 12.3 FALSE -0.124L31+L30 L31 4.39 0.64 L30 3.71 -0.19 178.8 0.005 Circle 6 0.013 0.014 0.66 0.02 0.014 0.3823 3.7 3.6 9.1 FALSE 0.696L32+L31 L32 5.42 1.62 L31 4.39 0.64 293.5 0.003 Circle 6 0.013 0.014 0.86 0.06 0.014 0.3242 4.3 11.5 14.8 FALSE 1.688L33+L32 L33 5.85 1.8 L32 5.42 1.62 90.7 0.002 Circle 6 0.013 0.014 0.85 0.06 0.014 0.25 5.6 11 14 FALSE 1.872L34+L26 L34 4.66 -0.24 L26 3.77 -1.28 287.3 0.004 Circle 6 0.013 0.009 0.58 0.01 0.009 0.3376 2.7 1.5 1.5 FALSE -0.192L35+L34 L35 5.3 0.7 L34 4.66 -0.24 253.5 0.004 Circle 6 0.013 0 0 0 0 0.3417 0 0 0 FALSE 0.7L36+L35 L36 5.75 1.65 L35 5.3 0.7 277.7 0.003 Circle 6 0.013 0 0 0 0 0.3282 0 0 0 FALSE 1.65L37+L36 L37 6.21 2.76 L36 5.75 1.65 322.8 0.003 Circle 6 0.013 0 0 0 0 0.329 0 0 0 FALSE 2.76L37+L38 L37 6.21 2.76 L38 5.64 2.24 210.4 0.002 Circle 6 0.013 0 0 0 0 0.2789 0 0 0 FALSE 2.76L38+L39 L38 5.64 2.24 L39 4.89 1.54 215.2 0.003 Circle 6 0.013 0 0 0 0 0.32 0 0 0 FALSE 2.24L39+L40 L39 4.89 1.54 L40 4.16 0.81 345.7 0.002 Circle 6 0.013 0 0 0 0 0.2578 0 0 0 FALSE 1.54L40+L42 L40 4.16 0.61 L42 3.25 0.2 345.8 0.001 Circle 8 0.013 0.0017 0.53 0 0.0017 0.4161 0.4 0.7 0.7 FALSE 0.814L41+L40 L41 6.09 0.95 L40 4.16 0.81 70.6 0.002 Circle 6 0.013 0.0017 0.53 0 0.0017 0.2499 0.7 0.9 0.9 FALSE 0.954L42+L43 L42 3.25 0.2 L43 2.56 -0.34 330.1 0.002 Circle 8 0.013 0.0017 0.53 0 0.0017 0.4887 0.3 0.7 0.7 FALSE 0.204L43+L44 L43 2.56 -0.34 L44 3.5 -0.85 334.4 0.002 Circle 8 0.013 0.0017 0.53 0 0.0017 0.4719 0.4 0.7 0.7 FALSE -0.336L44+L45 L44 3.5 -0.85 L45 2.57 -1.33 238.4 0.002 Circle 8 0.013 0.0017 0.53 0 0.0017 0.5422 0.3 0.7 0.7 FALSE -0.846 Attachments.xlsx/Calibration ADWF Page 7 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
233
Attachement 1
Average Dry Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
L45+L25 L45 2.57 -1.38 L25 3.54 -1.76 201.8 0.002 Circle 8 0.013 0.0057 0.56 0.01 0.0062 0.5244 1.1 1 4.3 FALSE -1.326L46+L45 L46 2.92 -0.93 L45 2.57 -1.23 136 0.002 Circle 6 0.013 0.004 0.59 0.01 0.004 0.2635 1.5 2.9 4 FALSE -0.908L47+L4 L47 3.21 -2.04 L4 3.39 -2.3 88 0.003 Circle 8 0.013 0.0714 0.93 0.01 0.0714 0.6568 10.9 2.1 27.2 FALSE -1.856L48+L47 L48 3.22 -1.35 L47 3.21 -2.04 228.9 0.003 Circle 8 0.013 0.0504 0.81 0.01 0.0504 0.6634 7.6 1.9 23.6 FALSE -1.189L49+L48 L49 4.08 -1.2 L48 3.22 -1.35 233.3 0.001 Circle 8 0.013 0.0504 0.81 0.01 0.0504 0.3064 16.4 1.9 34.5 FALSE -0.962L50+L49 L50 4.26 -0.68 L49 4.08 -1.2 223.6 0.002 Circle 8 0.013 0.0504 0.81 0.01 0.0504 0.5827 8.6 1.9 25.5 FALSE -0.506L51+L50 L51 3.85 -0.28 L50 4.26 -0.68 79.7 0.005 Circle 6 0.013 0.0013 0.53 0 0.0013 0.3975 0.3 0.8 0.8 FALSE -0.276L52+L50 L52 4.54 -0.36 L50 4.26 -0.68 223.9 0.001 Circle 6 0.013 0.0491 1.06 0.06 0.0491 0.2121 23.1 12.4 43.7 FALSE -0.14L53+L52 L53 5.4 0.6 L52 4.54 -0.36 218.4 0.004 Circle 6 0.013 0.0491 0.82 0.02 0.0491 0.372 13.2 3.1 31.5 FALSE 0.762L54+L53 L54 6.47 2.07 L53 5.4 0.6 369.4 0.004 Circle 6 0.013 0.037 0.91 0.04 0.037 0.3539 10.5 9 27.9 FALSE 2.218L55+L54 L55 6.53 2.37 L54 6.47 2.07 148.7 0.002 Circle 6 0.013 0.0177 0.91 0.06 0.0177 0.252 7 12.9 17.7 FALSE 2.459L56+L54 L56 7.59 3.34 L54 6.47 2.17 326.7 0.004 Circle 6 0.013 0.0193 0.93 0.07 0.0193 0.3358 5.7 13.3 18.3 FALSE 3.424L57+L53 L57 5.49 1.29 L53 5.4 0.65 202.8 0.003 Circle 6 0.013 0.0121 0.63 0.01 0.0121 0.3152 3.8 2.8 8.4 FALSE 1.345L58+L57 L58 6.75 2.35 L57 5.49 1.29 295.3 0.004 Circle 6 0.013 0.0121 0.82 0.05 0.0121 0.3362 3.6 10.6 13.1 FALSE 2.409L59+L58 L59 7.91 3.31 L58 6.75 2.35 250 0.004 Circle 6 0.013 0.0121 0.81 0.05 0.0121 0.3477 3.5 10 12.5 FALSE 3.368L60+L59 L60 8.08 3.53 L59 7.91 3.31 108.8 0.002 Circle 6 0.013 0.0121 0.8 0.05 0.0121 0.2523 4.8 9.7 12.5 FALSE 3.592L61+L5 L61 4.57 -0.73 L5 4.17 -1.13 152.5 0.003 Circle 6 0.013 0.006 0.61 0.02 0.006 0.2874 2.1 3.2 4.9 FALSE -0.7L62+L34 L62 4.95 0.45 L34 4.66 -0.19 146.7 0.004 Circle 6 0.013 0.009 0.62 0.02 0.009 0.3706 2.4 3 6.7 FALSE 0.49M2+I43 M2 5.62 0.3 I43 5.62 0.22 42.2 0.002 Circle 10 0.013 0.0025 0.54 0 0.2603 0.9539 0.3 0.6 33.7 FALSE 0.604M2+N1 M2 5.62 2.62 N1 5.32 2.32 82 0.004 Circle 12 0.013 0 0 0 0 2.1549 0 0 0 FALSE 0.604M3+M2 M3 6.98 1.33 M2 5.62 0.3 379.8 0.003 Circle 8 0.013 0.0015 0.53 0 0.2575 0.6293 0.2 0.6 47.9 FALSE 1.652M4+M31 M4 9.9 3 M31 7 2.52 142.5 0.003 Circle 8 0.013 0.0122 0.73 0.03 0.2022 0.7013 1.7 5 40.1 FALSE 3.271M5+M4 M5 11.95 3.9 M4 9.9 3.05 372.5 0.002 Circle 8 0.013 0.0519 0.85 0.15 0.2018 0.5772 9 23 44.6 FALSE 4.379M6+M22 M6 12.3 6.22 M22 12.3 5.54 341.1 0.002 Circle 10 0.013 0.0744 0.85 0.18 0.1443 0.9782 7.6 21.8 29 FALSE 6.463M7+M6 M7 12.4 6.45 M6 12.3 6.22 115.5 0.002 Circle 10 0.013 0.0979 1.02 0.19 0.1445 0.9777 10 23.2 28.6 FALSE 6.692M8+M7 M8 14.41 7.71 M7 12.4 6.45 192.5 0.007 Circle 10 0.013 0.1057 1.62 0.12 0.1447 1.7725 6 14.2 21.5 FALSE 7.976M12+M40 M12 14.95 7.4 M40 13.27 5.72 338.8 0.005 Circle 8 0.013 0.041 0.86 0.13 0.0567 0.8509 4.8 19.3 22.4 FALSE 7.548M13+M12 M13 16.33 8.78 M12 14.95 7.4 275.6 0.005 Circle 8 0.013 0.0368 0.89 0.12 0.0568 0.8551 4.3 17.5 22.4 FALSE 8.928M14+M5 M14 10.14 5.82 M5 11.95 3.95 327.8 0.006 Circle 6 0.013 0.001 0.52 0 0.001 0.4238 0.2 0.8 0.8 FALSE 5.824M16+M8 M16 14.85 8.05 M8 14.41 7.81 19.7 0.012 Circle 6 0.013 0.0005 0.45 0 0.0005 0.6193 0.1 0.6 0.6 FALSE 8.053M18+M5 M18 12 4.51 M5 11.95 4.2 153.9 0.002 Circle 10 0.013 0.0696 0.85 0.17 0.1445 0.9833 7.1 20.8 28.8 FALSE 4.753M19+M18 M19 12.1 4.7 M18 12 4.51 94.8 0.002 Circle 10 0.013 0.063 0.8 0.17 0.1449 0.9808 6.4 20.2 28.3 FALSE 4.942M20+M19 M20 12.2 4.86 M19 12.1 4.7 78 0.002 Circle 10 0.013 0.0706 0.88 0.17 0.145 0.9923 7.1 20.5 27.9 FALSE 5.1M21+M20 M21 12.3 5.45 M20 12.2 4.86 296.6 0.002 Circle 10 0.013 0.074 0.85 0.18 0.1444 0.9771 7.6 21.6 29 FALSE 5.694M22+M21 M22 12.3 5.54 M21 12.3 5.45 43.3 0.002 Circle 10 0.013 0.0885 1.13 0.17 0.146 0.9988 8.9 20.1 26.6 FALSE 5.774M23+M24 M23 7.5 4.92 M24 7.4 4.53 195 0.002 Circle 8 0.013 0.0387 0.66 0.15 0.0557 0.5404 7.2 22.4 27.6 FALSE 5.105M24+M25 M24 7.4 4.56 M25 7.3 4.04 260 0.002 Circle 8 0.013 0.0327 0.67 0.13 0.0557 0.5404 6 19.8 27.7 FALSE 4.745M25+M26 M25 7.3 4.04 M26 7.3 3.5 270 0.002 Circle 8 0.013 0.0371 0.71 0.14 0.0557 0.5404 6.9 20.7 27.7 FALSE 4.225M26+M27 M26 7.3 3.5 M27 7.2 3.25 124.9 0.002 Circle 8 0.013 0.022 0.65 0.1 0.0557 0.5406 4.1 15.3 27.7 FALSE 3.685M27+M29 M27 7.2 3.25 M29 7.1 3.18 35.2 0.002 Circle 8 0.013 0.0237 1.01 0.08 0.0557 0.5389 4.4 11.7 25.7 FALSE 3.431M28+N11 M28 7.3 0.37 N11 7.2 -0.1 236.4 0.002 Circle 8 0.013 0.0031 0.54 0.01 0.0031 0.5388 0.6 0.8 1.1 FALSE 0.389M29+M31 M29 7.1 3.18 M31 7 2.52 328.8 0.002 Circle 8 0.013 0.0373 0.76 0.13 0.0557 0.5414 6.9 19.8 27.7 FALSE 3.365M30+N29 M30 7.3 0.64 N29 7.2 0.13 255.2 0.002 Circle 8 0.013 0.006 0.68 0.03 0.006 0.5402 1.1 4.4 5.5 FALSE 0.675M31+M3 M31 7 2.52 M3 6.98 1.33 357.1 0.003 Circle 8 0.013 0.0033 0.58 0.01 0.2575 0.6975 0.5 1.9 45.2 FALSE 2.827M32+M33 M32 7.3 2.88 M33 7.3 2.49 195 0.002 Circle 8 0.013 0.0062 0.63 0.02 0.0062 0.5404 1.1 2.9 4.1 FALSE 2.915M33+M34 M33 7.3 2.49 M34 7.2 1.91 287.6 0.002 Circle 8 0.013 0.0062 0.68 0.03 0.0062 0.5426 1.1 4.6 5.9 FALSE 2.526M34+N22 M34 7.2 1.91 N22 7.1 1.4 253.5 0.002 Circle 8 0.013 0.011 0.69 0.03 0.011 0.542 2 4.1 8.7 FALSE 1.968M35+M34 M35 7.2 2.16 M34 7.2 1.91 123.6 0.002 Circle 8 0.013 0.0048 0.64 0.02 0.0048 0.5434 0.9 3.5 4.3 FALSE 2.189M36+M37 M36 7.3 3.24 M37 7.4 2.73 256.6 0.002 Circle 8 0.013 0.0108 0.77 0.04 0.0108 0.5387 2 6.5 8.5 FALSE 3.295M37+N24 M37 7.4 2.73 N24 7.3 2.21 259.3 0.002 Circle 8 0.013 0.0108 0.76 0.04 0.0108 0.5411 2 6.1 8.6 FALSE 2.786M38+M39 M38 19.58 12.03 M39 18.79 11.24 153 0.005 Circle 8 0.013 0.0532 1.28 0.1 0.0568 0.8683 6.1 15.4 21.7 FALSE 12.176M39+M43 M39 18.79 11.24 M43 17.59 10.04 240 0.005 Circle 8 0.013 0.0367 0.89 0.04 0.0567 0.8544 4.3 6.2 21.6 FALSE 11.387M40+M5 M40 13.27 5.72 M5 11.95 4.4 265.2 0.005 Circle 8 0.013 0.0284 0.86 0.1 0.0567 0.8525 3.3 15 22.4 FALSE 5.869M41+M13 M41 16.89 9.34 M13 16.33 8.78 109.7 0.005 Circle 8 0.013 0.0449 1.2 0.1 0.0568 0.8633 5.2 14.4 21.9 FALSE 9.487M42+M41 M42 17.07 9.82 M41 16.89 9.34 37 0.013 Circle 8 0.013 0.0401 0.92 0.04 0.0568 1.3763 2.9 6.6 17.4 FALSE 9.958M43+M42 M43 17.59 10.04 M42 17.07 9.82 103 0.002 Circle 8 0.013 0.0458 0.7 0.16 0.0568 0.5585 8.2 24.3 27.3 FALSE 10.223METERING STATION+T2 METERING STATION 0 -14.66 T2 3.04 -14.76 444.9 0 Circle 24 0.013 1.7982 9.49 0 2.3358 3.3914 53 0 43 FALSE -13.703N1+K6 N1 5.32 -2.08 K6 4.44 -2.86 253.3 0.003 Circle 12 0.013 0.153 1.26 0 0.153 1.977 7.7 0 0 FALSE -1.912N2+N1 N2 5.71 -1.39 N1 5.32 -2.08 295.7 0.002 Circle 10 0.013 0.153 1.26 0 0.153 1.0583 14.5 0 0 FALSE -1.175N3+N21 N3 6 -0.64 N21 6 -0.82 88.8 0.002 Circle 10 0.013 0.1316 1.24 0.02 0.1316 0.9864 13.3 2 2 FALSE -0.434N4+N3 N4 6.14 0.24 N3 6 -0.64 334.7 0.003 Circle 10 0.013 0.1316 1.24 0.02 0.1316 1.1234 11.7 2 2 FALSE 0.435N5+N4 N5 7.28 1.13 N4 6.14 0.29 332.5 0.003 Circle 10 0.013 0.1098 1.13 0.02 0.1098 1.1012 10 1.9 1.9 FALSE 1.309N6+N5 N6 8.64 1.99 N5 7.28 1.13 332.5 0.003 Circle 10 0.013 0.1098 1.13 0.02 0.1098 1.1142 9.9 1.9 1.9 FALSE 2.168N7+N6 N7 9.69 2.84 N6 8.64 1.99 332.7 0.003 Circle 10 0.013 0.1098 1.13 0.02 0.1098 1.1074 9.9 1.9 1.9 FALSE 3.018N8+N9 N8 13.8 4.05 N9 11.48 3.68 118.7 0.003 Circle 10 0.013 0.1098 1.13 0.02 0.1098 1.2232 9 1.9 1.9 FALSE 4.22N9+N7 N9 11.48 3.68 N7 9.69 2.84 284 0.003 Circle 10 0.013 0.1098 1.13 0.02 0.1098 1.1915 9.2 1.9 1.9 FALSE 3.852N10+N13 N10 7.1 -0.52 N13 7 -0.88 176 0.002 Circle 8 0.013 0.006 0.62 0.02 0.006 0.5465 1.1 2.7 4.8 FALSE -0.485N11+N12 N11 7.2 -0.1 N12 7.1 -0.56 227.2 0.002 Circle 8 0.013 0.0062 0.56 0.01 0.0062 0.5437 1.1 1 3.5 FALSE -0.065N12+N13 N12 7.1 -0.56 N13 7 -0.88 157.9 0.002 Circle 8 0.013 0.0062 0.56 0.01 0.0062 0.544 1.1 1 4.7 FALSE -0.524 Attachments.xlsx/Calibration ADWF Page 8 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
234
Attachement 1
Average Dry Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
N13+N14 N13 7 -0.88 N14 6 -1.21 167 0.002 Circle 8 0.013 0.0122 0.6 0.01 0.0122 0.5371 2.3 1.2 9.2 FALSE -0.817N14+N2 N14 6 -1.21 N2 5.71 -1.39 88.4 0.002 Circle 10 0.013 0.153 1.26 0 0.153 0.9886 15.5 0 0 FALSE -0.986N15+N16 N15 7.3 0.75 N16 7.2 0.25 251.8 0.002 Circle 8 0.013 0.0046 0.65 0.02 0.0046 0.5385 0.9 3.7 4.5 FALSE 0.778N16+N17 N16 7.2 0.25 N17 7.1 -0.21 228.2 0.002 Circle 8 0.013 0.0046 0.57 0.01 0.0046 0.5425 0.8 1.3 2.5 FALSE 0.277N17+N20 N17 7.1 -0.27 N20 7 -0.67 197 0.002 Circle 8 0.013 0.0046 0.55 0.01 0.0046 0.5445 0.8 0.9 3.7 FALSE -0.204N18+N19 N18 7.2 0.29 N19 7.1 -0.22 255.9 0.002 Circle 8 0.013 0.0046 0.65 0.02 0.0046 0.5394 0.9 3.7 4.6 FALSE 0.318N19+N20 N19 7.1 -0.22 N20 7 -0.67 224.1 0.002 Circle 8 0.013 0.0046 0.57 0.01 0.0046 0.5415 0.8 1.4 2.6 FALSE -0.192N20+N21 N20 7 -0.67 N21 6 -0.82 72 0.002 Circle 8 0.013 0.0092 0.65 0.02 0.0092 0.5515 1.7 3 21.2 FALSE -0.604N21+N14 N21 6 -0.82 N14 6 -1.21 195.8 0.002 Circle 10 0.013 0.1408 1.29 0.02 0.1408 0.9778 14.4 2.1 2.1 FALSE -0.604N22+N23 N22 7.1 1.4 N23 7.1 0.98 212 0.002 Circle 8 0.013 0.011 0.59 0.01 0.011 0.5378 2 1.2 7.2 FALSE 1.456N23+N28 N23 7.1 0.98 N28 7 0.59 193.2 0.002 Circle 8 0.013 0.011 0.59 0.01 0.011 0.5429 2 1.2 7.4 FALSE 1.036N24+N25 N24 7.3 2.21 N25 7.3 1.98 116.3 0.002 Circle 8 0.013 0.0108 0.74 0.04 0.0108 0.5374 2 5.6 8.3 FALSE 2.266N25+N26 N25 7.3 1.98 N26 7.2 1.46 262.5 0.002 Circle 8 0.013 0.0108 0.73 0.04 0.0108 0.5378 2 5.4 8.6 FALSE 2.036N26+N27 N26 7.2 1.46 N27 7.1 0.96 247.5 0.002 Circle 8 0.013 0.0108 0.59 0.01 0.0108 0.5431 2 1.2 6.3 FALSE 1.514N27+N28 N27 7.1 0.96 N28 7 0.59 183 0.002 Circle 8 0.013 0.0108 0.59 0.01 0.0108 0.5433 2 1.2 8 FALSE 1.016N28+N4 N28 7 0.59 N4 6.14 0.29 150.3 0.002 Circle 8 0.013 0.0218 0.66 0.01 0.0218 0.5398 4 1.4 14.9 FALSE 0.692N29+N10 N29 7.2 0.13 N10 7.1 -0.52 325.6 0.002 Circle 8 0.013 0.006 0.67 0.03 0.006 0.5399 1.1 4.2 5.6 FALSE 0.165N30+N11 N30 7.3 0.17 N11 7.2 -0.1 134 0.002 Circle 8 0.013 0.0031 0.54 0.01 0.0031 0.5424 0.6 0.8 3 FALSE 0.191O3+N8 O3 17.6 8.2 N8 13.8 4.1 205.1 0.02 Circle 8 0.013 0.1098 1.13 0.02 0.1098 1.7084 6.4 2.4 2.4 FALSE 8.347O4+O3 O4 15.39 9.13 O3 17.6 8.3 277.4 0.003 Circle 8 0.013 0.0912 1.03 0.02 0.0912 0.661 13.8 2.3 2.3 FALSE 9.299O5+O4 O5 14.73 10.25 O4 15.39 9.13 398.6 0.003 Circle 8 0.013 0.0912 1.03 0.02 0.0912 0.6405 14.2 2.3 2.3 FALSE 10.421O6+O5 O6 13.82 11.05 O5 14.73 10.25 399.4 0.002 Circle 8 0.013 0.0912 1.03 0.02 0.0912 0.5408 16.9 2.3 2.3 FALSE 11.236O7+O6 O7 15.16 11.56 O6 13.82 11.05 426.9 0.001 Circle 8 0.013 0.0912 1.03 0.02 0.0912 0.4177 21.8 2.3 2.3 FALSE 11.774O8+O59 O8 16.28 12.23 O59 16.36 11.92 102.7 0.003 Circle 8 0.013 0.0788 0.97 0.01 0.0788 0.6639 11.9 2.2 2.2 FALSE 12.387O9+O8 O9 17.01 12.76 O8 16.28 12.23 139.7 0.004 Circle 6 0.013 0.0711 0.92 0.01 0.0711 0.3456 20.6 2.8 2.8 FALSE 12.906O10+O9 O10 17.95 13.1 O9 17.01 12.76 156.6 0.002 Circle 8 0.013 0.0711 0.92 0.01 0.0711 0.563 12.6 2.1 2.1 FALSE 13.265O11+O10 O11 19.41 14.01 O10 17.95 13.15 259.2 0.003 Circle 8 0.013 0.0543 0.84 0.01 0.0549 0.696 7.8 1.9 24.5 FALSE 14.173O12+O11 O12 19.9 14.5 O11 19.41 14.01 394.2 0.001 Circle 8 0.013 0.0543 0.84 0.01 0.0548 0.426 12.7 1.9 31.2 FALSE 14.708O13+O12 O13 22.22 16.47 O12 19.9 14.5 414.6 0.005 Circle 8 0.013 0.0543 0.86 0.02 0.0551 0.8329 6.5 2.6 22.1 FALSE 16.878O14+O13 O14 21.75 17.35 O13 22.22 16.87 129.7 0.004 Circle 8 0.013 0.0105 0.66 0.02 0.0105 0.7351 1.4 3.3 5.8 FALSE 17.395O15+O14 O15 24.85 19.05 O14 21.75 17.35 307.9 0.006 Circle 8 0.013 0.0105 0.75 0.04 0.0105 0.8979 1.2 6.1 6.8 FALSE 19.233O16+O15 O16 28.01 22.56 O15 24.85 19.2 234.7 0.014 Circle 6 0.013 0.0105 0.59 0.01 0.0105 0.6713 1.6 1.5 6.5 FALSE 22.594O17+O3 O17 10.93 8.62 O3 17.6 8.3 161.2 0.002 Circle 8 0.013 0.0186 0.68 0.02 0.0187 0.5384 3.5 2.7 12.6 FALSE 8.71O18+O17 O18 15.83 11.93 O17 10.93 8.62 264 0.013 Circle 8 0.013 0.0051 0.58 0.01 0.0051 1.353 0.4 1.6 1.5 FALSE 11.953O19+O17 O19 17.6 10.75 O17 10.93 8.62 85.9 0.025 Circle 6 0.013 0.0135 0.61 0.01 0.0135 0.8835 1.5 1.7 6.8 FALSE 10.788O20+O19 O20 17 10.98 O19 17.6 10.75 115.6 0.002 Circle 6 0.013 0.0042 0.61 0.02 0.0042 0.2503 1.7 3.7 4.6 FALSE 11.003O21+O19 O21 20.09 12.64 O19 17.6 10.75 393.6 0.005 Circle 6 0.013 0.0093 0.61 0.01 0.0093 0.3888 2.4 2.5 7.3 FALSE 12.684O22+O21 O22 20 13.27 O21 20.09 12.64 318.2 0.002 Circle 6 0.013 0.0093 0.7 0.03 0.0093 0.2497 3.7 6.3 10.1 FALSE 13.32O23+O22 O23 21.65 15.65 O22 20 13.27 469.8 0.005 Circle 6 0.013 0.0093 0.73 0.04 0.0093 0.3993 2.3 7.2 8.6 FALSE 15.692O24+O23 O24 21.18 15.84 O23 21.65 15.65 96.7 0.002 Circle 6 0.013 0.0093 0.74 0.04 0.0093 0.2487 3.7 7.7 9.6 FALSE 15.889O25+O7 O25 16.12 12.07 O7 15.16 11.61 177.4 0.003 Circle 6 0.013 0.0124 0.6 0.01 0.0124 0.2857 4.3 1.6 10.5 FALSE 12.133O26+O25 O26 18.86 13.26 O25 16.12 12.12 332.8 0.003 Circle 6 0.013 0.0031 0.54 0.01 0.0031 0.3284 0.9 1.1 5.1 FALSE 13.315O27+O26 O27 19.94 13.44 O26 18.86 13.31 65.4 0.002 Circle 6 0.013 0.0031 0.54 0.01 0.0031 0.2502 1.2 1.1 1.1 FALSE 13.457O28+O26 O28 19 14.28 O26 18.86 13.41 434.3 0.002 Circle 6 0.013 0 0 0 0 0.2511 0 0 0 FALSE 14.28O29+O28 O29 23 19.53 O28 19 14.28 174 0.03 Circle 6 0.013 0 0 0 0 0.9746 0 0 0 FALSE 19.53O29+O30 O29 23 19.53 O30 22.78 19.08 226 0.002 Circle 6 0.013 0 0 0 0 0.2504 0 0 0 FALSE 19.53O30+O35 O30 22.78 17.63 O35 21.74 16.44 175.9 0.007 Circle 6 0.013 0.0168 0.63 0.01 0.0168 0.4615 3.6 1.9 1.9 FALSE 17.687O31+O30 O31 23 18.76 O30 22.78 18.58 89.5 0.002 Circle 6 0.013 0.009 0.7 0.03 0.009 0.2516 3.6 6.2 9.2 FALSE 18.809O32+O31 O32 24 19.18 O31 23 18.76 210.5 0.002 Circle 6 0.013 0.009 0.67 0.02 0.009 0.2506 3.6 4.8 8.3 FALSE 19.232O33+O32 O33 25 19.71 O32 24 19.18 262.5 0.002 Circle 6 0.013 0.009 0.72 0.04 0.0091 0.2521 3.6 7.2 9.6 FALSE 19.758O34+O10 O34 23.33 14.69 O10 17.95 13.35 267.7 0.005 Circle 6 0.013 0.0168 0.76 0.03 0.0168 0.397 4.2 6.9 6.9 FALSE 14.725O35+O34 O35 21.74 16.44 O34 23.33 14.69 316.4 0.006 Circle 6 0.013 0.0168 0.79 0.04 0.0168 0.4173 4 8.1 8.1 FALSE 16.458O36+O30 O36 24.12 18.01 O30 22.78 17.68 164.4 0.002 Circle 6 0.013 0.0077 0.68 0.03 0.0077 0.2514 3.1 5.6 5.6 FALSE 18.051O37+O25 O37 16.63 12.23 O25 16.12 12.07 80.9 0.002 Circle 6 0.013 0.0093 0.58 0.01 0.0093 0.2495 3.7 1.5 12.7 FALSE 12.283O38+O37 O38 17.23 12.46 O37 16.63 12.23 117.5 0.002 Circle 6 0.013 0.0031 0.54 0.01 0.0031 0.2482 1.2 1.1 1.1 FALSE 12.477O39+O37 O39 16.48 12.31 O37 16.63 12.23 40.8 0.002 Circle 6 0.013 0.0062 0.56 0.01 0.0062 0.2484 2.5 1.3 3.1 FALSE 12.344O40+O39 O40 16.65 12.38 O39 16.48 12.31 37.3 0.002 Circle 6 0.013 0.0031 0.54 0.01 0.0031 0.2431 1.3 1.1 16.1 FALSE 12.428O41+O40 O41 16.5 12.47 O40 16.65 12.38 44.5 0.002 Circle 6 0.013 0.0031 0.54 0.01 0.0031 0.2523 1.2 1.1 1.1 FALSE 12.485O42+O39 O42 16.78 12.41 O39 16.48 12.31 47.6 0.002 Circle 6 0.013 0.0031 0.54 0.01 0.0031 0.2572 1.2 1.1 1.6 FALSE 12.428O43+O42 O43 17.92 13.6 O42 16.78 12.41 181.9 0.007 Circle 6 0.013 0.0031 0.54 0.01 0.0031 0.4538 0.7 1.1 3.2 FALSE 13.645O44+O43 O44 18.13 13.78 O43 17.92 13.64 69.2 0.002 Circle 6 0.013 0.0031 0.54 0.01 0.0031 0.2524 1.2 1.1 1.1 FALSE 13.797O45+O8 O45 17.06 12.55 O8 16.28 12.23 65.8 0.005 Circle 6 0.013 0.0078 0.62 0.02 0.0078 0.3913 2 3.2 7.2 FALSE 12.59O46+O45 O46 18 13.61 O45 17.06 12.55 212.5 0.005 Circle 6 0.013 0.0016 0.53 0 0.0016 0.3963 0.4 0.9 0.9 FALSE 13.614O47+O45 O47 16.84 12.91 O45 17.06 12.55 71.5 0.005 Circle 6 0.013 0.0062 0.6 0.01 0.0062 0.3981 1.6 2.6 5.3 FALSE 12.943O48+O47 O48 17.43 13.52 O47 16.84 12.91 122 0.005 Circle 6 0.013 0.0016 0.53 0 0.0016 0.3967 0.4 0.9 0.9 FALSE 13.524O49+O47 O49 17.41 13.27 O47 16.84 12.91 72.6 0.005 Circle 6 0.013 0.0047 0.59 0.01 0.0047 0.3951 1.2 2.5 4.1 FALSE 13.294O50+O49 O50 17.95 14.13 O49 17.41 13.27 172.1 0.005 Circle 6 0.013 0.0047 0.55 0.01 0.0047 0.3966 1.2 1.2 2.6 FALSE 14.15O51+O13 O51 24.5 18.4 O13 22.22 16.57 467.6 0.004 Circle 6 0.013 0.0438 0.91 0.04 0.0441 0.351 12.5 7.5 31.8 FALSE 18.563O52+O51 O52 26.81 19.11 O51 24.5 18.4 213.3 0.003 Circle 6 0.013 0.029 0.7 0.01 0.029 0.3237 9 2.1 22.5 FALSE 19.234 Attachments.xlsx/Calibration ADWF Page 9 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
235
Attachement 1
Average Dry Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
O53+O52 O53 27 19.48 O52 26.81 19.11 188.5 0.002 Circle 6 0.013 0.0145 0.83 0.05 0.0145 0.2486 5.8 10.1 14.5 FALSE 19.554O54+O52 O54 31.19 20.39 O52 26.81 19.11 380.1 0.003 Circle 6 0.013 0.0145 0.69 0.02 0.0145 0.3256 4.5 4.9 12.2 FALSE 20.457O55+O54 O55 28.75 20.95 O54 31.19 20.44 399.4 0.001 Circle 6 0.013 0.0145 0.83 0.05 0.0145 0.2005 7.2 10.1 10.1 FALSE 21.035O56+O55 O56 27.04 22.24 O55 28.75 20.95 376.5 0.003 Circle 6 0.013 0.0145 0.74 0.03 0.0145 0.3284 4.4 6.8 12.1 FALSE 22.306O57+O51 O57 25.61 19.76 O51 24.5 18.4 365.2 0.004 Circle 6 0.013 0.0148 0.71 0.03 0.0148 0.3424 4.3 5.6 12.1 FALSE 19.827O58+O57 O58 26.81 20.57 O57 25.61 19.76 403.4 0.002 Circle 6 0.013 0.0148 0.83 0.05 0.0148 0.2514 5.9 10.4 15 FALSE 20.645O59+O7 O59 16.36 11.92 O7 15.16 11.56 182.3 0.002 Circle 8 0.013 0.0788 0.97 0.01 0.0788 0.537 14.7 2.2 2.2 FALSE 12.094O60+O61 O60 15.68 9.18 O61 14.55 7.85 199 0.007 Circle 14 0.013 0.1346 1.68 0.1 0.1436 4.3933 3.1 8.8 13.7 FALSE 9.341O61+M8 O61 14.55 7.85 M8 14.41 7.81 11.8 0.003 Circle 14 0.013 0.1272 1.78 0.14 0.1458 3.1288 4.1 11.9 15 FALSE 8.033O62+O18 O62 17.08 13.18 O18 15.83 11.93 249 0.005 Circle 6 0.013 0.0051 0.68 0.03 0.0051 0.3975 1.3 6.1 6.1 FALSE 13.209O63+O62 O63 17.27 13.37 O62 17.08 13.18 38 0.005 Circle 6 0.013 0.0051 0.63 0.02 0.0051 0.3967 1.3 4.2 4.9 FALSE 13.395T1+T0 T1 4.57 -15.43 T0 #N/A -17.68 329.2 0.007 Circle 24 0.013 1.7982 9.65 0.03 2.3358 18.7015 9.6 1.6 24 FALSE -14.895T2+T1 T2 3.04 -14.76 T1 4.57 -15.43 505.8 0.001 Circle 24 0.013 1.7982 9.6 0.02 2.3358 8.2331 21.8 1.1 35.9 FALSE -14.023T3+METERING STATION T3 2.52 -14.63 METERING STATION 0 -14.66 55 0.001 Circle 24 0.013 1.7982 9.49 0 2.3358 5.2832 34 0 47.2 FALSE -13.694T4+T3 T4 1.41 -12.09 T3 2.52 -14.63 474.9 0.005 Circle 24 0.013 1.7982 9.49 0 2.3358 16.5436 10.9 0 25.6 FALSE -11.455T5+T4 T5 0.16 -11.76 T4 1.41 -11.99 352.3 0.001 Circle 24 0.013 1.7982 9.49 0 2.3358 5.7799 31.1 0 39 FALSE -10.928T6+T5 T6 0.17 -11.38 T5 0.16 -11.66 382.1 0.001 Circle 24 0.013 1.7982 9.49 0 2.3358 6.1236 29.4 0 39.3 FALSE -10.552T7+T6 T7 -0.07 -10.42 T6 0.17 -11.28 480.8 0.002 Circle 24 0.013 1.7982 9.49 0 2.3358 9.5671 18.8 0 33.8 FALSE -9.737T8+T7 T8 0.14 -10.08 T7 -0.07 -10.32 501.9 0 Circle 24 0.013 1.7982 9.49 0 2.3358 4.9467 36.4 0 41.2 FALSE -9.181T9+T8 T9 0.14 -9.67 T8 0.14 -9.98 497.7 0.001 Circle 24 0.013 1.7982 9.49 0 2.3358 5.6456 31.9 0 41.2 FALSE -8.799T10+T9 T10 0.07 -9.12 T9 0.14 -9.57 446.9 0.001 Circle 24 0.013 1.7982 9.6 0.02 2.3358 7.1782 25.1 1 38 FALSE -8.333T11+T10 T11 -0.24 -8.44 T10 0.07 -9.02 325.8 0.002 Circle 24 0.013 1.7982 9.49 0 2.3358 9.5445 18.8 0 33.3 FALSE -7.758T12+T11 T12 0.55 -8.25 T11 -0.24 -8.49 482.2 0 Circle 24 0.013 1.7982 9.49 0 2.3358 5.0467 35.6 0 41.9 FALSE -7.355T13+T12 T13 2.14 -7.3 T12 0.55 -8.25 504 0.002 Circle 24 0.013 1.7982 9.49 0 2.3358 9.8211 18.3 0 33.8 FALSE -6.626T14+T13 T14 7.1 -7.1 T13 2.14 -7.3 478.1 0 Circle 24 0.013 1.7982 9.49 0 2.3358 4.6267 38.9 0 42 FALSE -6.193T15+T14 T15 2.75 -12.9 T14 7.1 -7.9 93 -0.054 Circle 24 0.013 1.7982 0.57 2 2.3358 52.4516 3.4 100 100 TRUE -5.864T16+T15 T16 1.34 -6.26 T15 2.75 -6.38 34.4 0.003 Circle 21 0.013 1.4197 7.6 0 2.0261 9.358 15.2 0 30.4 FALSE -5.712T17+T16 T17 0.96 -5.84 T16 1.34 -6.26 481.7 0.001 Circle 21 0.013 1.4197 7.6 0 2.0261 4.6785 30.3 0 43.6 FALSE -5.042T18+T17 T18 1.12 -5.23 T17 0.96 -5.79 540.4 0.001 Circle 21 0.013 1.4197 7.6 0 2.0261 5.1004 27.8 0 42.9 FALSE -4.457T19+T18 T19 2.23 -4.72 T18 1.12 -5.23 500 0.001 Circle 21 0.013 1.4197 7.79 0.04 2.0261 5.0602 28.1 2.2 43 FALSE -3.939T20+T19 T20 2.72 -3.98 T19 2.23 -4.62 331.9 0.002 Circle 18 0.013 0.6762 4.14 0.05 0.8085 4.6124 14.7 3.4 29.7 FALSE -3.539T21+T20 T21 3.07 -3.43 T20 2.72 -3.98 338.4 0.002 Circle 18 0.013 0.6617 4.01 0.04 0.794 4.2346 15.6 2.7 29.8 FALSE -2.974T22+T21 T22 2.81 -3.39 T21 3.07 -3.43 197.4 0 Circle 18 0.013 0.62 3.71 0.02 0.7523 1.4952 41.5 1.5 33.6 FALSE -2.825T23+T22 T23 6.87 -3.03 T22 2.81 -3.29 446 0.001 Circle 18 0.013 0.62 3.98 0.08 0.7523 2.5361 24.4 5.1 35.3 FALSE -2.468T24+T23 T24 3.66 -2.69 T23 6.87 -2.93 316.7 0.001 Circle 18 0.013 0.529 3.47 0.06 0.6612 2.8915 18.3 4.3 31.4 FALSE -2.197T25+T24 T25 3.95 -2.59 T24 3.66 -2.62 282.2 0 Circle 18 0.013 0.529 3.14 0 0.6612 1.083 48.8 0 35.3 FALSE -2.008T26+T25 T26 7.03 -2.32 T25 3.95 -2.52 305.6 0.001 Circle 18 0.013 0.465 3.18 0.07 0.5971 2.6871 17.3 4.7 31.1 FALSE -1.835T27+T26 T27 7.85 -2.05 T26 7.03 -2.22 355.8 0 Circle 18 0.013 0.465 3.11 0.06 0.5971 2.296 20.3 3.8 32.2 FALSE -1.539T28+T27 T28 8.67 -1.93 T27 7.85 -1.95 162.1 0 Circle 18 0.013 0.465 2.82 0 0.5971 1.1667 39.9 0 29.8 FALSE -1.425T29+T28 T29 4.98 -1.62 T28 8.67 -1.93 233.8 0.001 Circle 18 0.013 0.465 2.82 0 0.5971 3.8248 12.2 0 27.3 FALSE -1.206AbbreviationsCFS: Cubic Feet per Secondft: Feets: Secondsin: Inches Attachments.xlsx/Calibration ADWF Page 10 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
236
Attachment 2
Peak Wet Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
A1+A2 A1 16.28 2 A2 15.82 1.92 79.9 0.001 Circle 12 0.013 0.378 1.536 2.2 0.83 1.536 1.1273 136.3 83.3 FALSE 2.85A2+A5 A2 15.82 1.82 A5 14.53 1.57 244.2 0.001 Circle 12 0.013 0.395 1.57 2.21 0.85 1.57 1.1399 137.7 84.8 FALSE 2.79A3+A2 A3 14.86 8.76 A2 15.82 2.12 287.5 0.023 Circle 6 0.013 0.017 0.034 1.11 0.09 0.034 0.8527 4 17.5 TRUE 8.848A4+A3 A4 14 9.48 A3 14.86 8.86 312 0.002 Circle 6 0.013 0.017 0.034 0.62 0.16 0.034 0.2501 13.6 32.1 FALSE 9.64A5+A8 A5 14.53 1.57 A8 13.85 1.53 124.3 0 Circle 15 0.013 0.412 1.604 2.35 0.68 1.604 1.1587 138.4 54.5 FALSE 2.351A6+A5 A6 13.72 7.32 A5 14.53 5.81 286.8 0.005 Circle 6 0.013 0.017 0.034 0.82 0.13 0.034 0.4071 8.4 26.3 FALSE 7.449A7+A6 A7 14 8.03 A6 13.72 7.42 306 0.002 Circle 6 0.013 0.017 0.034 0.63 0.16 0.034 0.2505 13.6 32 FALSE 8.19A8+A9 A8 13.85 1.43 A9 12.82 1.16 61.2 0.004 Circle 15 0.013 0.412 1.604 3.28 0.52 1.604 4.2904 37.4 42 FALSE 1.966A9+A10 A9 12.82 0.62 A10 11.42 0.57 181.2 0 Circle 15 0.013 0.412 1.604 2.08 0.75 1.604 1.073 149.5 60.1 FALSE 1.465A10+A15 A10 11.42 0.47 A15 9.93 0.03 299.3 0.001 Circle 15 0.013 0.4413 1.6685 2.01 0.8 1.6685 2.4767 67.4 64.1 FALSE 1.261A11+A10 A11 11.83 2.53 A10 11.42 1.12 417.5 0.003 Circle 6 0.013 0.0293 0.0645 0.95 0.19 0.0646 0.3261 19.8 37.8 FALSE 2.72A12+A11 A12 9.52 4.07 A11 11.83 2.63 485.1 0.003 Circle 6 0.013 0.0293 0.0645 0.9 0.2 0.0646 0.3057 21.1 39.2 FALSE 4.268A13+A12 A13 7.19 5.15 A12 9.52 4.07 412.1 0.003 Circle 6 0.013 0.0293 0.0645 0.86 0.2 0.0646 0.2872 22.5 40.6 FALSE 5.355A14+A13 A14 8.06 5.91 A13 7.19 5.19 288.3 0.002 Circle 6 0.013 0.0293 0.0644 0.84 0.21 0.0647 0.2804 23 41.2 FALSE 6.116A15+A16 A15 9.93 -0.03 A16 8.08 -0.17 435.1 0 Circle 15 0.013 0.4413 1.6685 1.72 0.92 1.6685 1.1587 144 73.7 FALSE 0.997A16+A21 A16 8.08 -0.22 A21 7.13 -0.42 296.3 0.001 Circle 15 0.013 0.4553 1.7392 2.05 0.81 1.7392 1.6782 103.6 65.2 FALSE 0.67A17+A16 A17 8.77 1.57 A16 8.08 0.73 422.7 0.002 Circle 6 0.013 0.004 0.0259 0.67 0.13 0.0259 0.2501 10.4 25.2 FALSE 1.696A18+A16 A18 7.05 1.45 A16 8.08 0.73 441.8 0.002 Circle 6 0.013 0.01 0.0448 0.59 0.2 0.0448 0.2265 19.8 41 FALSE 1.656A19+A18 A19 6.77 2.98 A18 7.05 1.45 213.5 0.007 Circle 6 0.013 0.01 0.0448 1.01 0.14 0.0448 0.475 9.4 27.7 FALSE 3.119A20+A19 A20 5.62 3.73 A19 6.77 3.05 339.8 0.002 Circle 6 0.013 0.01 0.0448 0.64 0.19 0.0448 0.251 17.8 38.7 FALSE 3.924A21+A23 A21 7.13 -0.52 A23 7.01 -0.8 155.1 0.002 Circle 15 0.013 0.4553 1.7392 2.65 0.66 1.7392 2.7445 63.4 52.8 FALSE 0.183A22+A29 A22 6.99 -0.92 A29 6.36 -1.21 369.1 0.001 Circle 18 0.013 0.463 1.7791 1.94 0.77 1.7791 2.9442 60.4 51.6 FALSE -0.109A23+A22 A23 7.01 -0.8 A22 6.99 -0.92 13.8 0.009 Circle 15 0.013 0.463 1.7791 2.3 0.75 1.7791 6.0235 29.5 60.4 FALSE -0.102A24+A23 A24 7.7 1.62 A23 7.01 0.37 250.6 0.005 Circle 6 0.013 0.0077 0.0399 0.81 0.15 0.0399 0.3963 10.1 29.8 FALSE 1.767A25+A24 A25 8.36 2.89 A24 7.7 1.62 253.1 0.005 Circle 6 0.013 0.0077 0.0399 0.81 0.15 0.0399 0.3974 10 29.7 FALSE 3.037A26+A25 A26 7.42 4.06 A25 8.36 2.89 234.1 0.005 Circle 6 0.013 0.0077 0.0399 0.95 0.13 0.0399 0.3967 10.1 26.7 FALSE 4.202A27+A26 A27 6.96 5 A26 7.42 4.06 310.9 0.003 Circle 6 0.013 0.0077 0.0399 0.69 0.17 0.0399 0.3085 12.9 33.5 FALSE 5.165A28+A29 A28 6.24 0.21 A29 6.36 -0.25 14.8 0.031 Circle 6 0.013 0.002 0.0129 0.72 0.03 0.0129 0.9892 1.3 6.4 FALSE 0.248A29+T29 A29 6.36 -1.24 T29 4.98 -1.62 345.5 0.001 Circle 18 0.013 0.465 1.792 2.11 0.73 1.792 3.4835 51.4 48.5 FALSE -0.474A30+A28 A30 6.07 1.27 A28 6.24 0.32 301 0.003 Circle 6 0.013 0.002 0.0129 0.83 0.07 0.0129 0.3152 4.1 13.3 FALSE 1.33B2+A1 B2 16 2.46 A1 16.28 2.1 180.8 0.002 Circle 12 0.013 0.378 1.536 2.5 0.73 1.536 1.5897 96.6 72.9 FALSE 3.245B3+B2 B3 18.59 2.64 B2 16 2.46 239.4 0.001 Circle 12 0.013 0.361 1.5017 2.1 0.86 1.5017 0.9769 153.7 85.6 FALSE 3.614B4+B3 B4 20.32 3.42 B3 18.59 2.74 464.8 0.001 Circle 12 0.013 0.361 1.5017 2.07 0.87 1.5017 1.3627 110.2 87.1 FALSE 4.336B5+B52 B5 18.61 4.51 B52 20.58 4.29 176.2 0.001 Circle 12 0.013 0.361 1.5017 2.28 0.78 1.5017 1.2589 119.3 78.2 FALSE 5.372B6+B5 B6 18.29 5.6 B5 18.61 4.56 158.4 0.007 Circle 12 0.013 0.349 1.492 3.57 0.53 1.492 2.8867 51.7 52.5 FALSE 6.14B7+B6 B7 18.66 5.76 B6 18.29 5.6 380.1 0 Circle 12 0.013 0.305 1.358 1.83 0.9 1.358 0.7309 185.8 89.7 TRUE 6.839B8+B7 B8 20.55 6.5 B7 18.66 5.81 371 0.002 Circle 12 0.013 0.2883 1.3252 1.96 0.8 1.3252 1.5364 86.3 80.5 TRUE 7.276B9+B8 B9 18.41 7.16 B8 20.55 6.55 350.9 0.002 Circle 12 0.013 0.2755 1.2725 2.15 0.71 1.2725 1.4854 85.7 70.6 FALSE 7.895B10+B9 B10 16.86 7.61 B9 18.41 7.16 289.7 0.002 Circle 12 0.013 0.1951 1.1735 2.03 0.69 1.1735 1.4041 83.6 69.1 FALSE 8.327B11+B10 B11 16.46 8.71 B10 16.86 7.66 201.4 0.005 Circle 12 0.013 0.1695 1.0403 3.03 0.45 1.0403 2.5724 40.4 45.1 FALSE 9.174B12+B11 B12 15.83 9.18 B11 16.46 8.76 277 0.002 Circle 12 0.013 0.1695 0.9383 1.94 0.59 0.9383 1.3872 67.6 59 FALSE 9.798B13+B12 B13 15.33 9.53 B12 15.83 9.18 262.7 0.001 Circle 12 0.013 0.1695 0.8363 1.77 0.58 0.8363 1.3004 64.3 57.9 FALSE 10.129B14+B13 B14 15.47 10.07 B13 15.33 9.53 253.1 0.002 Circle 12 0.013 0.1695 0.7343 1.96 0.48 0.7343 1.6456 44.6 48.1 FALSE 10.553B15+B49 B15 20.29 12.19 B49 17.11 11.21 330.9 0.003 Circle 8 0.013 0.1695 0.7343 2.12 0.65 0.7343 0.6576 111.7 96.9 TRUE 13.012B16+B15 B16 20.39 13.24 B15 20.29 12.19 327.3 0.003 Circle 8 0.013 0.1695 0.7343 2.1 0.67 0.7343 0.6844 107.3 100 TRUE 14.239B17+B13 B17 19.31 13.31 B13 15.33 9.73 501.1 0.007 Circle 6 0.013 0.028 0.102 1.62 0.18 0.102 0.4742 21.5 35.7 FALSE 13.495B18+B17 B18 22.26 14.3 B17 19.31 13.31 497.2 0.002 Circle 6 0.013 0.0259 0.102 0.97 0.26 0.102 0.2504 40.7 52.7 FALSE 14.564B19+B12 B19 20.74 14.44 B12 15.83 9.88 499.6 0.009 Circle 6 0.013 0.0382 0.102 1.7 0.17 0.1023 0.536 19 34.5 FALSE 14.614B20+B19 B20 23.22 19.12 B19 20.74 14.44 585 0.008 Circle 6 0.013 0.0519 0.102 1.62 0.18 0.1023 0.5018 20.3 35.7 FALSE 19.298B21+B11 B21 18.68 13.54 B11 16.46 9.36 399.6 0.01 Circle 6 0.013 0.0297 0.102 1.78 0.17 0.1023 0.5738 17.8 33.2 FALSE 13.707B22+B21 B22 24.77 18.67 B21 18.68 13.58 399.5 0.013 Circle 6 0.013 0.0288 0.102 1.8 0.16 0.1023 0.6333 16.1 31.6 FALSE 18.829B23+B22 B23 28 23.55 B22 24.77 18.67 380.2 0.013 Circle 6 0.013 0.0363 0.102 1.8 0.16 0.102 0.6357 16 31.5 FALSE 23.708B24+B10 B24 22.52 15.82 B10 16.86 9.61 492.5 0.013 Circle 6 0.013 0.0284 0.1332 2.05 0.18 0.1332 0.63 21.1 35.3 FALSE 15.998B25+B24 B25 27.09 18.84 B24 22.52 15.82 406.2 0.007 Circle 6 0.013 0.0256 0.1332 1.77 0.2 0.1332 0.4838 27.5 40.7 FALSE 19.047B26+B25 B26 27.62 21.62 B25 27.09 18.84 401.5 0.007 Circle 6 0.013 0.0267 0.0666 1.24 0.16 0.0666 0.4669 14.3 31.7 FALSE 21.778B27+B25 B27 25.46 19.69 B25 27.09 18.99 318 0.002 Circle 6 0.013 0.0256 0.0666 0.82 0.22 0.0666 0.2632 25.3 43.1 FALSE 19.906B28+B27 B28 24.83 20.93 B27 25.46 19.69 202 0.006 Circle 6 0.013 0.0256 0.0666 1.2 0.16 0.0742 0.4396 15.2 32.5 FALSE 21.093B29+B9 B29 19.43 13.68 B9 18.41 7.61 211.2 0.029 Circle 6 0.013 0.0804 0.099 1.63 0.13 0.099 0.9512 10.4 25.3 FALSE 13.809B30+B29 B30 23.55 14.31 B29 19.43 13.83 243.2 0.002 Circle 6 0.013 0.0268 0.033 0.66 0.15 0.033 0.2493 13.2 30.3 FALSE 14.468B31+B29 B31 21.81 15.76 B29 19.43 13.68 256.8 0.008 Circle 6 0.013 0.0536 0.066 1.31 0.15 0.066 0.505 13.1 30.3 FALSE 15.913B32+B31 B32 26.3 16.37 B31 21.81 15.86 253.7 0.002 Circle 6 0.013 0.0268 0.033 0.63 0.16 0.033 0.2516 13.1 31.1 FALSE 16.525B33+B31 B33 25.73 19.18 B31 21.81 15.76 279.8 0.012 Circle 6 0.013 0.0268 0.033 1.16 0.1 0.0372 0.6203 5.3 19.9 FALSE 19.281B34+B8 B34 24.69 15.24 B8 20.55 7.1 251.1 0.032 Circle 6 0.013 0.0128 0.0527 1.27 0.1 0.0531 1.0102 5.2 20.1 FALSE 15.342B35+B34 B35 26.3 20 B34 24.69 15.24 363.8 0.013 Circle 6 0.013 0.0128 0.0527 1.37 0.12 0.0527 0.6418 8.2 24.9 FALSE 20.126B36+B35 B36 24.45 20.41 B35 26.3 20 207 0.002 Circle 6 0.013 0.0128 0.0527 0.7 0.2 0.0527 0.2497 21.1 40.9 FALSE 20.614B37+B6 B37 14.71 7.31 B6 18.29 6.74 262.3 0.002 Circle 6 0.013 0.044 0.134 1.12 0.29 0.134 0.2616 51.2 58.5 FALSE 7.607B38+B50 B38 12.43 7.93 B50 13.27 7.77 38.9 0.004 Circle 6 0.013 0.02 0.072 1.1 0.18 0.072 0.3598 20 36.7 FALSE 8.121B39+B38 B39 13 8.56 B38 12.43 8.03 265.5 0.002 Circle 6 0.013 0.01 0.036 0.62 0.17 0.036 0.2507 14.4 33.7 FALSE 8.73B40+B39 B40 13 9.17 B39 13 8.56 306.1 0.002 Circle 6 0.013 0.01 0.036 0.62 0.17 0.036 0.2505 14.4 33.7 FALSE 9.338 Attachments.xlsx/Calibration PWWF Page 1 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
237
Attachment 2
Peak Wet Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
B41+B38 B41 11.68 8.37 B38 12.43 8.03 170 0.002 Circle 6 0.013 0.01 0.036 0.62 0.17 0.036 0.2509 14.3 33.7 FALSE 8.54B42+B41 B42 11.68 8.7 B41 11.68 8.37 166.3 0.002 Circle 6 0.013 0.01 0.036 0.62 0.17 0.036 0.2499 14.4 33.8 FALSE 8.869B43+B37 B43 15.97 8.74 B37 14.71 8.01 363.4 0.002 Circle 6 0.013 0.017 0.036 0.62 0.17 0.036 0.2515 14.3 33.6 FALSE 8.908B44+B2 B44 15.76 9.16 B2 16 2.46 296.4 0.023 Circle 6 0.013 0.017 0.0343 1.11 0.09 0.0343 0.8436 4.1 17.7 TRUE 9.249B45+B44 B45 14.05 9.86 B44 15.76 9.26 301 0.002 Circle 6 0.013 0.017 0.0343 0.62 0.16 0.0343 0.2505 13.7 32.3 FALSE 10.021B46+B5 B46 19 13.75 B5 18.61 12.56 16.9 0.07 Circle 6 0.013 0.012 0.0097 0.63 0.02 0.0097 1.4889 0.7 3.1 FALSE 13.769B47+B46 B47 20.58 14.06 B46 19 13.75 157.8 0.002 Circle 6 0.013 0.012 0.0097 0.8 0.05 0.0097 0.2487 3.9 10 FALSE 14.112B48+B7 B48 22.9 7.11 B7 18.66 6.21 450.2 0.002 Circle 6 0.013 0.0167 0.0328 0.59 0.16 0.0328 0.2509 13.1 32.5 TRUE 7.265B49+B14 B49 17.11 11.16 B14 15.47 10.07 327.7 0.003 Circle 8 0.013 0.1695 0.7343 2.23 0.6 0.7343 0.6969 105.4 89.4 FALSE 11.8B50+B37 B50 13.27 7.77 B37 14.71 7.31 204.7 0.002 Circle 6 0.013 0.027 0.098 1 0.25 0.098 0.266 36.8 50 FALSE 8.023B51+B50 B51 14.15 9.95 B50 13.27 7.97 281.7 0.007 Circle 6 0.013 0.007 0.026 1.03 0.09 0.026 0.4704 5.5 18.6 FALSE 10.043B52+B4 B52 20.58 4.29 B4 20.32 3.57 359.8 0.002 Circle 12 0.013 0.361 1.5017 2.34 0.76 1.5017 1.5937 94.2 76.1 FALSE 5.073C1+B16 C1 23.15 14.8 B16 20.39 13.24 401.9 0.004 Circle 8 0.013 0.1695 0.7343 2.1 0.67 0.7343 0.7528 97.5 100 TRUE 15.781C2+C1 C2 21.54 15.19 C1 23.15 14.85 204.3 0.002 Circle 8 0.013 0.1235 0.5727 1.64 0.67 0.5727 0.4929 116.2 100 TRUE 16.204C3+C2 C3 22.97 17.37 C2 21.54 15.24 397.8 0.005 Circle 6 0.013 0.1065 0.5067 2.58 0.5 0.5067 0.4106 123.4 100 TRUE 19.837C4+C3 C4 25.03 19.53 C3 22.97 17.42 436 0.005 Circle 6 0.013 0.0885 0.4501 2.29 0.5 0.4501 0.3903 115.3 100 TRUE 23.013C5+C4 C5 25.49 20.95 C4 25.03 19.53 327.7 0.004 Circle 6 0.013 0.0885 0.4501 2.29 0.5 0.4501 0.3693 121.9 100 TRUE 25.383C6+C5 C6 25.82 21.42 C5 25.49 20.99 87.5 0.005 Circle 6 0.013 0.0697 0.3822 1.95 0.5 0.3822 0.3933 97.2 100 TRUE 25.779C7+C6 C7 34.43 23.65 C6 25.82 21.42 447.8 0.005 Circle 6 0.013 0.0697 0.3822 1.95 0.5 0.3822 0.3959 96.5 100 TRUE 28.169C8+C7 C8 29.93 24.33 C7 34.43 23.65 400.9 0.002 Circle 6 0.013 0.0447 0.2797 1.42 0.5 0.2797 0.2311 121.1 100 TRUE 29.337C9+C8 C9 30 24.55 C8 29.93 24.38 84.1 0.002 Circle 6 0.013 0.0437 0.2665 1.36 0.5 0.2665 0.2523 105.7 100 TRUE 29.485C10+C9 C10 31.71 25.71 C9 30 24.55 300.8 0.004 Circle 6 0.013 0.0437 0.2665 1.36 0.5 0.2665 0.3484 76.5 100 TRUE 30.26C11+C10 C11 41.2 28.9 C10 31.71 25.76 508 0.006 Circle 6 0.013 0.0248 0.1754 0.89 0.5 0.176 0.4411 39.8 100 TRUE 30.876C12+C1 C12 23.43 14.93 C1 23.15 14.85 264.8 0 Circle 6 0.013 0.046 0.1616 0.82 0.5 0.1616 0.0975 165.7 100 TRUE 16.057C13+C12 C13 23 15.99 C12 23.43 15.03 480.7 0.002 Circle 6 0.013 0.01 0.0472 0.24 0.5 0.0472 0.2507 18.8 99.9 TRUE 16.19C14+C12 C14 24.3 15.8 C12 23.43 14.97 282.1 0.003 Circle 6 0.013 0.036 0.1144 0.58 0.5 0.1144 0.3043 37.6 100 TRUE 16.155C15+C14 C15 22.5 18.05 C14 24.3 16.1 565.3 0.003 Circle 6 0.013 0.018 0.0572 0.89 0.18 0.0572 0.3295 17.4 36.1 FALSE 18.231C16+C14 C16 26.5 17.4 C14 24.3 16.05 272.9 0.005 Circle 6 0.013 0.018 0.0572 1 0.17 0.0572 0.3946 14.5 33.2 FALSE 17.566C17+C16 C17 27.07 19.62 C16 26.5 17.4 332.8 0.007 Circle 6 0.013 0.018 0.0572 1.13 0.15 0.0572 0.4583 12.5 30.4 FALSE 19.773C18+C17 C18 28 20.36 C17 27.07 19.62 369.6 0.002 Circle 6 0.013 0.018 0.0572 0.73 0.21 0.0572 0.2511 22.8 41.9 FALSE 20.57C19+C2 C19 21.59 15.49 C2 21.54 15.24 264.1 0.001 Circle 6 0.013 0.017 0.066 0.34 0.5 0.0757 0.1726 38.2 100 TRUE 16.238C20+C19 C20 23.19 17.64 C19 21.59 15.54 198.5 0.011 Circle 6 0.013 0.0085 0.033 1.16 0.1 0.0342 0.5771 5.7 20.2 TRUE 17.743C21+C19 C21 23.94 17.74 C19 21.59 15.54 284.2 0.008 Circle 6 0.013 0.0085 0.033 0.65 0.15 0.0331 0.4937 6.7 30.4 TRUE 17.881C22+C21 C22 24.43 18.08 C21 23.94 17.79 91.8 0.003 Circle 6 0.013 0.0085 0.033 0.75 0.14 0.033 0.3154 10.5 27.5 FALSE 18.218C23+C3 C23 23.27 18.07 C3 22.97 17.42 400.5 0.002 Circle 6 0.013 0.018 0.0566 0.29 0.5 0.0566 0.226 25 100 TRUE 19.892C24+C23 C24 25.53 18.72 C23 23.27 18.42 151.2 0.002 Circle 6 0.013 0.008 0.0283 0.14 0.5 0.0283 0.2499 11.3 100 TRUE 19.892C25+C23 C25 25.08 19.73 C23 23.27 18.17 303.1 0.005 Circle 6 0.013 0.01 0.0283 0.14 0.5 0.0283 0.4025 7 100 TRUE 19.893C26+D9 C26 29.07 24.47 D9 27.55 21.3 435.8 0.007 Circle 6 0.013 0.0309 0.2 2.06 0.25 0.2 0.4785 41.8 49.5 FALSE 24.718C27+C5 C27 25 21.41 C5 25.49 20.97 221.6 0.002 Circle 6 0.013 0.0188 0.0679 0.35 0.5 0.068 0.25 27.2 100 TRUE 25.406C28+C27 C28 27.89 23.34 C27 25 21.41 43 0.045 Circle 6 0.013 0.0115 0.0195 0.1 0.5 0.0196 1.1887 1.6 100 TRUE 25.407C29+C28 C29 32.14 23.94 C28 27.89 23.34 298.4 0.002 Circle 6 0.013 0.0115 0.0195 0.1 0.5 0.0195 0.2516 7.7 100 TRUE 25.407C30+C27 C30 28.53 23.63 C27 25 21.41 162.9 0.014 Circle 6 0.013 0.0073 0.0484 0.25 0.5 0.0486 0.655 7.4 100 TRUE 25.407C31+C30 C31 29.09 23.76 C30 28.53 23.63 67.1 0.002 Circle 6 0.013 0.0014 0.0195 0.1 0.5 0.0195 0.247 7.9 100 TRUE 25.407C32+C30 C32 30.12 24.36 C30 28.53 23.63 146.7 0.005 Circle 6 0.013 0.0059 0.029 0.15 0.5 0.029 0.3958 7.3 100 TRUE 25.407C33+C32 C33 31.26 24.53 C32 30.12 24.39 70.7 0.002 Circle 6 0.013 0.0044 0.0195 0.1 0.5 0.0195 0.2497 7.8 100 TRUE 25.407C34+C32 C34 30 24.5 C32 30.12 24.39 56.9 0.002 Circle 6 0.013 0.0015 0.0095 0.05 0.5 0.0095 0.2467 3.8 100 TRUE 25.407C35+C7 C35 31.98 25.2 C7 34.43 23.65 403.4 0.004 Circle 6 0.013 0.025 0.1025 0.52 0.5 0.1028 0.3478 29.5 100 TRUE 28.169C36+C35 C36 32.58 25.7 C35 31.98 25.2 92 0.005 Circle 6 0.013 0.025 0.1025 0.52 0.5 0.1026 0.4136 24.8 100 TRUE 28.17C37+C36 C37 34.3 26.67 C36 32.58 25.73 153.2 0.006 Circle 6 0.013 0.005 0.0572 0.29 0.5 0.0891 0.4395 13 100 TRUE 28.17C39+C37 C39 33.37 27.03 C37 34.3 26.7 164.1 0.002 Circle 6 0.013 0.005 0.0459 0.23 0.5 0.0459 0.2516 18.2 100 TRUE 28.171C40+C36 C40 32.93 26.9 C36 32.58 25.83 257.5 0.004 Circle 6 0.013 0.02 0.0458 0.23 0.5 0.0458 0.3617 12.7 100 TRUE 28.17C41+C40 C41 33.56 27.26 C40 32.93 26.93 191.4 0.002 Circle 6 0.013 0.02 0.0458 0.23 0.5 0.0458 0.233 19.7 100 TRUE 28.171C42+C41 C42 34.21 27.91 C41 33.56 27.31 300.1 0.002 Circle 6 0.013 0.02 0.0458 0.23 0.5 0.0458 0.2509 18.3 100 TRUE 28.171C43+C8 C43 30.16 24.53 C8 29.93 24.33 101 0.002 Circle 6 0.013 0.001 0.0132 0.07 0.5 0.0132 0.2497 5.3 100 TRUE 29.337C44+C10 C44 32.45 26.73 C10 31.71 25.76 154.5 0.006 Circle 6 0.013 0.0189 0.0911 0.46 0.5 0.0914 0.4446 20.5 100 TRUE 30.261C45+C44 C45 33.66 27.91 C44 32.45 26.77 166.1 0.007 Circle 6 0.013 0.0189 0.0911 0.46 0.5 0.0911 0.4648 19.6 100 TRUE 30.261C46+C45 C46 36.3 29.85 C45 33.66 27.91 255.5 0.008 Circle 6 0.013 0.0189 0.0911 0.46 0.5 0.0911 0.4889 18.6 100 TRUE 30.262C47+C46 C47 35.05 30.62 C46 36.3 30 309.1 0.002 Circle 6 0.013 0.0189 0.0911 0.92 0.25 0.0911 0.2513 36.3 50.1 FALSE 30.87C48+C11 C48 43.08 29.1 C11 41.2 28.98 178.7 0.001 Circle 6 0.013 0.0248 0.1755 0.89 0.5 0.1755 0.1454 120.7 100 TRUE 31.03C49+C48 C49 41.32 29.82 C48 43.08 29.1 247.7 0.003 Circle 6 0.013 0.0248 0.1755 0.89 0.5 0.1755 0.3025 58 100 TRUE 31.28C50+C49 C50 40.78 30.68 C49 41.32 29.82 361.2 0.002 Circle 6 0.013 0.0248 0.1755 0.89 0.5 0.1755 0.2738 64.1 100 TRUE 31.689C51+C50 C51 38.55 32.75 C50 40.78 30.68 556.1 0.004 Circle 6 0.013 0.0248 0.1755 1.52 0.28 0.1755 0.3423 51.3 56.8 TRUE 33.033D1+E4 D1 17.33 6.83 E4 16.28 6.08 354.5 0.002 Circle 12 0.013 0.2054 2.1273 2.71 1 2.1273 1.6387 129.8 100 TRUE 18.603D2+D1 D2 17.54 6.91 D1 17.33 6.88 53.3 0.001 Circle 12 0.013 0.2054 2.1275 2.71 1 2.1275 0.8452 251.7 100 TRUE 18.692D3+D2 D3 18.91 7.46 D2 17.54 6.99 363.3 0.001 Circle 12 0.013 0.2054 2.1276 2.71 1 2.1276 1.2814 166 100 TRUE 19.941D4+D3 D4 19 8.15 D3 18.91 7.56 296.1 0.002 Circle 8 0.013 0.0595 0.8383 2.4 0.67 0.8383 0.5394 155.4 100 TRUE 21.448D5+D4 D5 19 8.29 D4 19 8.15 69.6 0.002 Circle 8 0.013 0.0595 0.8385 2.4 0.67 0.8385 0.5419 154.7 100 TRUE 21.729D6+D5 D6 19.87 13.77 D5 19 8.29 246.1 0.022 Circle 8 0.013 0.0324 0.58 1.66 0.67 0.58 1.8031 32.2 100 TRUE 21.731D7+D6 D7 19.85 15.5 D6 19.87 13.82 398 0.004 Circle 8 0.013 0.0324 0.58 1.66 0.67 0.58 0.7851 73.9 100 TRUE 21.736 Attachments.xlsx/Calibration PWWF Page 2 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
238
Attachment 2
Peak Wet Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
D8+D7 D8 21.51 16.11 D7 19.85 15.5 157.8 0.004 Circle 6 0.013 0.0361 0.2 1.02 0.5 0.2001 0.3488 57.3 100 TRUE 21.737D9+D8 D9 27.55 21.3 D8 21.51 16.11 496 0.01 Circle 6 0.013 0.0299 0.2 1.02 0.5 0.2001 0.5739 34.8 100 TRUE 21.739D10+D3 D10 21.78 10.58 D3 18.91 7.81 489.1 0.006 Circle 10 0.013 0.1459 1.2894 2.36 0.83 1.2894 1.6488 78.2 100 TRUE 21.639D16+D20 D16 23 13.91 D20 22 13 453.9 0.002 Circle 8 0.013 0.018 0.1999 0.57 0.67 0.2003 0.541 37 100 TRUE 22.221D17+D16 D17 23.1 14.18 D16 23 13.91 136.3 0.002 Circle 8 0.013 0.018 0.2 0.57 0.67 0.2003 0.5378 37.2 100 TRUE 22.222D19+D10 D19 21.54 12.39 D10 21.78 10.63 48.1 0.037 Circle 8 0.013 0.1459 1.2895 3.69 0.67 1.2895 2.3114 55.8 100 TRUE 22.164D20+D19 D20 22 13 D19 21.54 12.89 52.7 0.002 Circle 8 0.013 0.036 0.2767 0.79 0.67 0.2771 0.5521 50.1 100 TRUE 22.165D21+D19 D21 20.93 15.08 D19 21.54 12.84 390.8 0.006 Circle 8 0.013 0.1099 1.013 2.9 0.67 1.013 0.9148 110.7 100 TRUE 22.171D22+D21 D22 22.23 15.84 D21 20.93 15.13 149 0.005 Circle 6 0.013 0.1099 1.013 5.16 0.5 1.013 0.3873 261.5 100 TRUE 22.244D23+D22 D23 22.62 16.12 D22 22.23 15.88 73.3 0.003 Circle 6 0.013 0.1099 0.663 3.37 0.5 0.663 0.3211 206.5 100 TRUE 23.318D24+D23 D24 24.01 17.46 D23 22.62 16.12 349.8 0.004 Circle 6 0.013 0.1099 0.663 3.37 0.5 0.663 0.3473 190.9 100 TRUE 28.649D25+D24 D25 24.45 18.45 D24 24.01 17.56 300.9 0.003 Circle 6 0.013 0.0348 0.323 1.64 0.5 0.323 0.3051 105.9 100 TRUE 28.651D26+D25 D26 24.79 19.26 D25 24.45 18.5 156.7 0.005 Circle 6 0.013 0.0348 0.323 1.64 0.5 0.323 0.3907 82.7 100 TRUE 28.652D27+D26 D27 26.68 20.86 D26 24.79 19.28 392.4 0.004 Circle 6 0.013 0 0.17 0.87 0.5 0.1701 0.356 47.7 100 TRUE 28.653D28+D27 D28 27.45 21.65 D27 26.68 20.9 81.1 0.009 Circle 6 0.013 0 0.17 0.87 0.5 0.17 0.5396 31.5 100 TRUE 28.654D29+C37 D29 34.53 27.53 C37 34.3 26.7 129.5 0.006 Circle 6 0.013 0 0 0 0.5 0 0.4492 0 100 TRUE 28.655D29+D28 D29 34.53 27.53 D28 27.45 21.67 465.5 0.013 Circle 6 0.013 0 0 0 0.5 0 0.6295 0 100 TRUE 28.655D30+D26 D30 26.26 21.18 D26 24.79 19.29 436.5 0.004 Circle 6 0.013 0.0348 0.153 0.78 0.5 0.1531 0.3692 41.4 100 TRUE 28.653D31+D30 D31 26.68 21.76 D30 26.26 21.46 152.5 0.002 Circle 6 0.013 0.0124 0.0765 0.39 0.5 0.0765 0.2489 30.7 100 TRUE 28.654D32+D30 D32 26.44 21.71 D30 26.26 21.46 126.2 0.002 Circle 6 0.013 0.0224 0.0765 0.39 0.5 0.0765 0.2497 30.6 100 TRUE 28.654D33+D24 D33 28.14 19.34 D24 24.01 17.51 450.4 0.004 Circle 6 0.013 0.0448 0.1686 0.86 0.5 0.1686 0.3576 47.1 100 TRUE 29.143D34+D33 D34 34.45 22.3 D33 28.14 19.34 293.3 0.01 Circle 6 0.013 0.0448 0.1686 0.86 0.5 0.2011 0.5637 29.9 100 TRUE 29.431D35+D34 D35 33.56 22.51 D34 34.45 22.3 177.8 0.001 Circle 6 0.013 0.0448 0.1686 0.86 0.5 0.1686 0.1928 87.4 100 TRUE 29.567D36+D35 D36 31.3 25.05 D35 33.56 22.56 250.8 0.01 Circle 6 0.013 0.0208 0.02 0.1 0.5 0.02 0.5591 3.6 100 TRUE 29.568D37+D36 D37 31.11 26.01 D36 31.3 25.05 367.8 0.003 Circle 6 0.013 0.0216 0.02 0.1 0.5 0.02 0.2866 7 100 TRUE 29.568D38+D37 D38 32 26.64 D37 31.11 26.16 237.7 0.002 Circle 6 0.013 0.0191 0.01 0.05 0.5 0.01 0.2521 4 100 TRUE 29.569D39+D38 D39 32.14 26.81 D38 32 26.64 84.1 0.002 Circle 6 0.013 0.0257 0.01 0.05 0.5 0.01 0.2523 4 100 TRUE 29.569D40+D37 D40 32 26.6 D37 31.11 26.21 193.6 0.002 Circle 6 0.013 0.0208 0.01 0.05 0.5 0.01 0.2518 4 100 TRUE 29.569D41+D24 D41 31.35 25.75 D24 24.01 17.51 190.6 0.043 Circle 6 0.013 0.0304 0.1714 0.87 0.5 0.1714 1.1666 14.7 100 TRUE 28.649D42+D41 D42 30 26 D41 31.35 25.8 100.2 0.002 Circle 6 0.013 0.004 0.0214 0.11 0.5 0.0214 0.2507 8.5 100 TRUE 28.65D43+D41 D43 32 26.89 D41 31.35 25.85 517.4 0.002 Circle 6 0.013 0.0264 0.15 0.76 0.5 0.15 0.2516 59.6 100 TRUE 28.651D44+D43 D44 32 27.12 D43 32 26.89 113 0.002 Circle 6 0.013 0.0264 0.15 0.76 0.5 0.1501 0.2531 59.3 100 TRUE 28.652D47+D22 D47 20.69 17.09 D22 22.23 15.86 299.2 0.004 Circle 6 0.013 0.0413 0.35 1.78 0.5 0.35 0.3597 97.3 100 TRUE 22.246D48+D47 D48 22.05 18.7 D47 20.69 17.09 401 0.004 Circle 6 0.013 0.0292 0.35 1.78 0.5 0.35 0.3555 98.4 100 TRUE 22.249D49+D48 D49 27.59 21.99 D48 22.05 18.7 399.7 0.008 Circle 6 0.013 0.0383 0.35 1.78 0.5 0.3507 0.509 68.8 100 TRUE 22.32D50+D49 D50 31.35 22.83 D49 27.59 21.99 421.6 0.002 Circle 6 0.013 0.0338 0.35 1.78 0.5 0.35 0.2504 139.8 100 TRUE 24.376D51+D7 D51 23.54 18.66 D7 19.85 15.5 457.8 0.007 Circle 6 0.013 0.0324 0.38 1.93 0.5 0.38 0.4662 81.5 100 TRUE 21.739D52+D51 D52 27.31 20.31 D51 23.54 18.69 267 0.006 Circle 6 0.013 0.0216 0.24 1.22 0.5 0.24 0.437 54.9 100 TRUE 21.741D53+D52 D53 29.62 21.22 D52 27.31 20.31 247.8 0.004 Circle 6 0.013 0.0108 0.12 0.61 0.5 0.12 0.34 35.3 100 TRUE 21.741D54+D53 D54 29.68 21.68 D53 29.62 21.27 74.9 0.005 Circle 6 0.013 0.0108 0.12 1.12 0.27 0.12 0.4151 28.9 53.4 FALSE 21.894D55+D54 D55 30.37 22.39 D54 29.68 21.88 252.3 0.002 Circle 6 0.013 0.0108 0.12 1.05 0.28 0.12 0.2523 47.6 56.6 FALSE 22.673D56+D35 D56 35.05 23.65 D35 33.56 22.51 286.3 0.004 Circle 6 0.013 0.024 0.1486 0.76 0.5 0.1499 0.354 42 100 TRUE 29.775D57+D56 D57 37.86 26.21 D56 35.05 23.7 197.1 0.013 Circle 6 0.013 0.024 0.1486 0.76 0.5 0.1629 0.6332 23.5 100 TRUE 29.887D58+D57 D58 37.67 27.07 D57 37.86 26.36 158 0.004 Circle 6 0.013 0.024 0.1486 0.76 0.5 0.1489 0.3761 39.5 100 TRUE 29.957D59+D58 D59 37.27 28.53 D58 37.67 27.12 151.4 0.009 Circle 6 0.013 0.024 0.1486 0.76 0.5 0.1497 0.5415 27.4 100 TRUE 30.021D60+D59 D60 37.44 29.8 D59 37.27 28.57 112.6 0.011 Circle 6 0.013 0.024 0.1336 0.68 0.5 0.1344 0.5864 22.8 100 TRUE 30.041D61+D60 D61 37.37 30.05 D60 37.44 29.84 101 0.002 Circle 6 0.013 0.024 0.1336 1.17 0.28 0.1336 0.2558 52.2 56.4 FALSE 30.343D62+D59 D62 32.76 29.07 D59 37.27 28.57 247.7 0.002 Circle 6 0.013 0.0229 0.015 0.08 0.5 0.0156 0.2521 6 100 TRUE 30.022D63+D5 D63 19.63 8.6 D5 19 8.29 296.6 0.001 Circle 8 0.013 0.0271 0.2587 0.74 0.67 0.2587 0.3906 66.2 100 TRUE 21.804D64+D63 D64 24.68 17.38 D63 19.63 8.56 470.5 0.019 Circle 6 0.013 0.0263 0.1988 1.01 0.5 0.211 0.7682 25.9 100 TRUE 22.523D65+D64 D65 28.98 20.08 D64 24.68 17.38 448 0.006 Circle 6 0.013 0.0242 0.1988 1.01 0.5 0.1993 0.4356 45.6 100 TRUE 23.204D66+D65 D66 29.37 20.96 D65 28.98 20.13 412.5 0.002 Circle 6 0.013 0.0222 0.1989 1.01 0.5 0.1989 0.2517 79 100 TRUE 23.817D67+D63 D67 18.77 12.39 D63 19.63 8.6 294.1 0.013 Circle 6 0.013 0.0271 0.06 0.31 0.5 0.0602 0.6369 9.4 100 TRUE 21.805D68+D67 D68 19 12.7 D67 18.77 12.42 138.9 0.002 Circle 6 0.013 0.0134 0.03 0.15 0.5 0.0301 0.2519 11.9 100 TRUE 21.805D69+D67 D69 19 12.94 D67 18.77 12.42 259 0.002 Circle 6 0.013 0.0137 0.0301 0.15 0.5 0.0301 0.2514 12 100 TRUE 21.805D70+D51 D70 24 18.86 D51 23.54 18.72 70.8 0.002 Circle 6 0.013 0.0108 0.14 0.71 0.5 0.14 0.2495 56.1 100 TRUE 21.74D71+D52 D71 28.07 22.62 D52 27.31 21.11 130 0.012 Circle 6 0.013 0.0108 0.12 1.96 0.17 0.121 0.6047 19.8 34.5 TRUE 22.793D72+D20 D72 22.5 13.56 D20 22 13 279.6 0.002 Circle 8 0.013 0.018 0.0769 0.22 0.67 0.0772 0.5408 14.2 100 TRUE 22.165D73+D72 D73 23 14.16 D72 22.5 13.56 297.4 0.002 Circle 8 0.013 0.018 0.0769 0.22 0.67 0.0774 0.5427 14.2 100 TRUE 22.166D74+D73 D74 23.2 14.58 D73 23 14.16 210.2 0.002 Circle 8 0.013 0.018 0.0769 0.22 0.67 0.0776 0.5401 14.2 100 TRUE 22.166E1+H9 E1 12.09 3.59 H9 11.84 3.14 269.8 0.002 Circle 12 0.013 0.4047 3.0914 3.94 1 3.0914 1.455 212.5 100 TRUE 14.341E2+E1 E2 13.48 4.23 E1 12.09 3.64 283.2 0.002 Circle 12 0.013 0.2054 2.1269 2.71 1 2.1269 1.6261 130.8 100 TRUE 15.276E3+E2 E3 15.11 4.76 E2 13.48 4.33 279.6 0.002 Circle 12 0.013 0.2054 2.1271 2.71 1 2.1271 1.3971 152.2 100 TRUE 16.198E4+E3 E4 16.28 6.08 E3 15.11 5.01 356.7 0.003 Circle 12 0.013 0.2054 2.1272 2.71 1 2.1272 1.9512 109 100 TRUE 17.405E6+E1 E6 11.14 4.84 E1 12.09 4.04 501 0.002 Circle 12 0.013 0.1994 0.9646 1.23 1 0.9646 1.4236 67.8 100 TRUE 14.681E7+E6 E7 11.77 6.02 E6 11.14 4.84 310.5 0.004 Circle 8 0.013 0.1844 0.9041 2.59 0.67 0.9041 0.7449 121.4 100 TRUE 14.687E8+E7 E8 13.72 6.77 E7 11.77 6.07 354.7 0.002 Circle 8 0.013 0.1544 0.7823 2.24 0.67 0.7823 0.5368 145.7 100 TRUE 14.692E9+E8 E9 13.77 7.32 E8 13.72 6.82 341.1 0.001 Circle 12 0.013 0.1294 0.6605 0.84 1 0.6605 1.364 48.4 100 TRUE 14.696E10+E9 E10 14.53 7.78 E9 13.77 7.32 192.1 0.002 Circle 12 0.013 0.1294 0.6605 0.84 1 0.6605 1.7433 37.9 100 TRUE 14.699 Attachments.xlsx/Calibration PWWF Page 3 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
239
Attachment 2
Peak Wet Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
E11+E10 E11 14.94 8.04 E10 14.53 7.93 194.9 0.001 Circle 12 0.013 0.1124 0.5237 0.67 1 0.5237 0.8464 61.9 100 TRUE 14.701E12+E11 E12 20.13 9.13 E11 14.94 8.14 494.5 0.002 Circle 12 0.013 0.1124 0.5237 0.67 1 0.5237 1.5941 32.9 100 TRUE 14.706E13+E12 E13 18.72 10 E12 20.13 9.18 450.3 0.002 Circle 8 0.013 0.0732 0.3879 1.11 0.67 0.388 0.5156 75.2 100 TRUE 14.709E14+E13 E14 17.24 10.39 E13 18.72 10.12 185.5 0.001 Circle 8 0.013 0.0608 0.2317 0.66 0.67 0.2317 0.461 50.3 100 TRUE 14.71E15+E14 E15 15.27 10.72 E14 17.24 10.49 246.2 0.001 Circle 8 0.013 0.043 0.201 0.58 0.67 0.201 0.3693 54.4 100 TRUE 14.711E20+E7 E20 12.61 7.71 E7 11.77 6.12 504.5 0.003 Circle 6 0.013 0.015 0.0609 0.31 0.5 0.061 0.315 19.3 100 TRUE 14.688E21+E20 E21 14.72 8.53 E20 12.61 7.76 385.6 0.002 Circle 6 0.013 0.015 0.0609 0.31 0.5 0.0609 0.2507 24.3 100 TRUE 14.688E22+E8 E22 15.38 8.48 E8 13.72 6.87 449.9 0.004 Circle 6 0.013 0.015 0.0609 0.31 0.5 0.061 0.3356 18.1 100 TRUE 14.693E23+E22 E23 16.82 10.42 E22 15.38 8.48 438.8 0.004 Circle 6 0.013 0.015 0.0609 0.31 0.5 0.0619 0.3731 16.3 100 TRUE 14.694E25+E50 E25 16.75 10.9 E50 16.04 9.64 231.9 0.005 Circle 6 0.013 0.017 0.067 0.34 0.5 0.067 0.4136 16.2 100 TRUE 14.7E26+E25 E26 19.82 13.82 E25 16.75 10.9 488.2 0.006 Circle 6 0.013 0.017 0.067 0.34 0.5 0.0678 0.4339 15.4 100 TRUE 14.701E27+E12 E27 21.28 15.85 E12 20.13 9.53 576.2 0.011 Circle 6 0.013 0.0137 0.0427 0.22 0.5 0.0477 0.5876 7.3 100 TRUE 15.973E28+E27 E28 22 15.93 E27 21.28 15.81 61.8 0.002 Circle 6 0.013 0.0137 0.0427 0.71 0.17 0.0429 0.2472 17.3 34.4 FALSE 16.12E29+E12 E29 23.08 15.79 E12 20.13 9.58 247 0.025 Circle 6 0.013 0.0255 0.0931 0.47 0.5 0.0931 0.8896 10.5 100 TRUE 15.92E30+E29 E30 27 20.5 E29 23.08 15.83 502.3 0.009 Circle 6 0.013 0.01 0.067 1.39 0.15 0.067 0.541 12.4 29.4 FALSE 20.647E31+E29 E31 27.93 20.63 E29 23.08 15.83 252.3 0.019 Circle 6 0.013 0.0155 0.061 1.4 0.12 0.061 0.7739 7.9 23.8 FALSE 20.75E32+E31 E32 28 21.21 E31 27.93 20.68 263.2 0.002 Circle 6 0.013 0.0155 0.061 0.76 0.21 0.061 0.2518 24.2 42.8 FALSE 21.424E33+E13 E33 21.41 15.78 E13 18.72 10.02 228.9 0.025 Circle 8 0.013 0.0124 0.0911 0.26 0.67 0.0911 1.9168 4.8 100 TRUE 15.978E33+E29 E33 21.41 17.11 E29 23.08 15.86 455.1 0.003 Circle 6 0.013 0 0 0 0 0 0.2941 0 0 FALSE 17.11E34+E33 E34 24.94 18.94 E33 21.41 15.83 278.9 0.011 Circle 6 0.013 0.01 0.04 1.12 0.12 0.0413 0.5925 6.8 23.7 FALSE 19.061E35+E14 E35 19.06 11.41 E14 17.24 10.74 333 0.002 Circle 6 0.013 0.0178 0.0306 0.16 0.5 0.0306 0.2517 12.1 100 TRUE 14.711E36+E15 E36 17.4 12.35 E15 15.27 10.82 420.2 0.004 Circle 6 0.013 0.04 0.1827 0.93 0.5 0.1827 0.3386 54 100 TRUE 14.712E37+E36 E37 18 13.11 E36 17.4 12.4 353.2 0.002 Circle 6 0.013 0.015 0.0609 0.31 0.5 0.0609 0.2516 24.2 100 TRUE 14.713E38+E36 E38 18.78 13.33 E36 17.4 12.35 233.6 0.004 Circle 6 0.013 0.025 0.1218 0.62 0.5 0.1218 0.3634 33.5 100 TRUE 14.713E39+E38 E39 19 14.13 E38 18.78 13.53 300.6 0.002 Circle 6 0.013 0.015 0.0609 0.31 0.5 0.0609 0.2507 24.3 100 TRUE 14.713E40+E38 E40 22.91 14.25 E38 18.78 13.33 458.2 0.002 Circle 6 0.013 0.01 0.0609 0.31 0.5 0.0609 0.2514 24.2 100 TRUE 14.714E41+E15 E41 16 11.07 E15 15.27 10.87 98.3 0.002 Circle 6 0.013 0.003 0.0183 0.09 0.5 0.0183 0.2531 7.2 100 TRUE 14.711E42+E10 E42 14.56 10.06 E10 14.53 7.88 550.5 0.004 Circle 6 0.013 0 0.0698 0.36 0.5 0.0699 0.3531 19.8 100 TRUE 14.699E44+E8 E44 12.57 8.62 E8 13.72 6.82 630.5 0.003 Circle 6 0.013 0.01 0.0609 0.31 0.5 0.0609 0.2998 20.3 100 TRUE 14.693E45+E44 E45 13.15 9.55 E44 12.57 8.57 319.4 0.003 Circle 6 0.013 0.01 0.0609 0.31 0.5 0.0611 0.3108 19.6 100 TRUE 14.694E46+E7 E46 11 7.4 E7 11.77 6.02 500.5 0.003 Circle 6 0.013 0.015 0.0609 0.31 0.5 0.0618 0.2946 20.7 100 TRUE 14.688E47+E46 E47 11.54 8.31 E46 11 7.4 455.2 0.002 Circle 6 0.013 0.015 0.0609 0.31 0.5 0.0609 0.2509 24.3 100 TRUE 14.689E48+E6 E48 11.94 7.54 E6 11.14 5.19 498.5 0.005 Circle 8 0.013 0.015 0.0607 0.17 0.67 0.0623 0.8296 7.3 100 TRUE 14.682E49+E48 E49 11.53 8.46 E48 11.94 7.54 457.8 0.002 Circle 6 0.013 0.015 0.0608 0.31 0.5 0.0611 0.2515 24.2 100 TRUE 14.683E50+E10 E50 16.04 9.64 E10 14.53 7.88 217.9 0.008 Circle 6 0.013 0.017 0.067 0.34 0.5 0.067 0.5043 13.3 100 TRUE 14.699F7+T25 F7 4.65 0.3 T25 3.95 -2.2 477 0.005 Circle 8 0.013 0.064 0.1876 1.75 0.23 0.1876 0.8748 21.4 34.6 FALSE 0.53F8+F7 F8 8.3 1.38 F7 4.65 0.3 356.7 0.003 Circle 8 0.013 0.064 0.1876 1.45 0.27 0.1876 0.6649 28.2 39.8 FALSE 1.65F9+F23 F9 8.21 3.11 F23 8.23 2.7 110 0.004 Circle 6 0.013 0.047 0.1428 1.42 0.26 0.1428 0.3425 41.7 51 FALSE 3.368F10+F9 F10 11.76 4.96 F9 8.21 3.21 462.6 0.004 Circle 6 0.013 0.047 0.1428 1.42 0.25 0.1428 0.3451 41.4 50.9 FALSE 5.216F11+F10 F11 13 6.84 F10 11.76 5.06 419.8 0.004 Circle 6 0.013 0.047 0.1428 1.48 0.25 0.1428 0.3654 39.1 49.2 FALSE 7.091F12+F11 F12 13 7.65 F11 13 6.94 355.2 0.002 Circle 6 0.013 0.032 0.078 0.86 0.24 0.078 0.2509 31.1 47 FALSE 7.886F13+F19 F13 15.24 10.24 F19 15.18 10.23 24.2 0 Circle 6 0.013 0.024 0.026 0.34 0.21 0.026 0.1141 22.8 41.1 FALSE 10.441F14+F8 F14 9.56 5.64 F8 8.3 1.76 463.1 0.008 Circle 6 0.013 0.003 0.019 0.94 0.07 0.019 0.5136 3.7 13.7 FALSE 5.708F15+F11 F15 13.27 7.77 F11 13 7.17 301.1 0.002 Circle 6 0.013 0.015 0.0648 0.78 0.22 0.0651 0.2505 25.9 43.9 FALSE 7.992F16+F15 F16 13.27 8.24 F15 13.27 7.77 238 0.002 Circle 6 0.013 0.015 0.065 0.78 0.22 0.065 0.2493 26.1 43.9 FALSE 8.46F17+F22 F17 15.11 8.76 F22 13 8.39 130.3 0.003 Circle 6 0.013 0.032 0.078 0.98 0.21 0.078 0.299 26.1 42.6 FALSE 8.976F18+F17 F18 15.34 9.94 F17 15.11 8.89 197.5 0.005 Circle 6 0.013 0.004 0.026 1.07 0.09 0.0261 0.4091 6.4 17.8 FALSE 10.037F19+F20 F19 15.18 10.33 F20 15.15 9.7 188.8 0.003 Circle 6 0.013 0.024 0.026 0.94 0.1 0.026 0.3241 8 19.8 FALSE 10.44F20+F17 F20 15.15 9.7 F17 15.11 8.86 281.2 0.003 Circle 6 0.013 0.028 0.052 0.8 0.18 0.052 0.3067 17 36.7 FALSE 9.884F21+F20 F21 15.15 10.38 F20 15.15 9.7 136.4 0.005 Circle 6 0.013 0.004 0.026 0.8 0.11 0.026 0.3962 6.6 22.2 FALSE 10.484F22+F12 F22 13 8.39 F12 13 7.65 158.8 0.005 Circle 6 0.013 0.032 0.078 1.19 0.18 0.078 0.383 20.4 36.8 FALSE 8.577F23+F8 F23 8.23 2.7 F8 8.3 1.48 327.4 0.004 Circle 8 0.013 0.061 0.1686 1.49 0.24 0.1686 0.7376 22.9 36 FALSE 2.943F24+F23 F24 8.23 3.19 F23 8.23 2.7 98 0.005 Circle 6 0.013 0.014 0.0258 0.97 0.1 0.0259 0.3967 6.5 19.3 FALSE 3.295F25+F24 F25 8.73 3.77 F24 8.23 3.19 115 0.005 Circle 6 0.013 0.002 0.0129 0.84 0.06 0.0129 0.3985 3.2 11.2 FALSE 3.826F26+F25 F26 8.73 4.36 F25 8.73 3.77 118 0.005 Circle 6 0.013 0.002 0.0129 0.8 0.05 0.0129 0.3967 3.3 9.6 FALSE 4.415F27+F24 F27 8.73 3.78 F24 8.23 3.19 118 0.005 Circle 6 0.013 0.012 0.0129 0.8 0.05 0.0129 0.3967 3.3 9.6 FALSE 3.835F28+F27 F28 8.73 4.57 F27 8.73 3.78 158 0.005 Circle 6 0.013 0.012 0.0129 0.79 0.04 0.0129 0.3967 3.3 8.8 FALSE 4.623G2+G19 G2 4.2 0.05 G19 2.65 -0.76 154 0.005 Circle 6 0.013 0.0796 0.1265 1.54 0.22 0.1265 0.4069 31.1 43.5 FALSE 0.271G3+G14 G3 7 1.85 G14 6.79 1.05 208.1 0.004 Circle 6 0.013 0.0566 0.1071 1.29 0.22 0.1071 0.3479 30.8 43.9 FALSE 2.076G4+G3 G4 7.49 2.26 G3 7 1.95 212.7 0.001 Circle 6 0.013 0.0436 0.0881 0.82 0.27 0.0881 0.2142 41.1 53.7 FALSE 2.534G6+G4 G6 10.75 5.12 G4 7.49 2.36 387.6 0.007 Circle 6 0.013 0.0318 0.0764 1.35 0.16 0.0765 0.4735 16.1 33 FALSE 5.289G7+G6 G7 10.12 5.81 G6 10.75 5.22 294.7 0.002 Circle 6 0.013 0.0159 0.0383 0.62 0.18 0.0383 0.251 15.3 35.4 FALSE 5.993G8+G7 G8 10.83 6.45 G7 10.12 5.8 326.8 0.002 Circle 6 0.013 0.0159 0.0381 0.61 0.18 0.0384 0.2502 15.2 35.6 FALSE 6.628G9+G6 G9 8.88 5.78 G6 10.75 5.2 290.8 0.002 Circle 6 0.013 0.0159 0.0382 0.61 0.18 0.0383 0.2506 15.2 35.7 FALSE 5.963G10+G9 G10 11.09 6.24 G9 8.88 5.78 270.6 0.002 Circle 6 0.013 0.0159 0.0381 0.57 0.19 0.0384 0.2313 16.5 37.2 FALSE 6.432G11+G10 G11 11.78 6.87 G10 11.09 6.34 265.7 0.002 Circle 6 0.013 0.0159 0.0383 0.61 0.18 0.0383 0.2506 15.3 35.4 FALSE 7.047G12+G4 G12 8.32 3.02 G4 7.49 2.47 277 0.002 Circle 6 0.013 0.0118 0.0116 0.83 0.06 0.0116 0.25 4.6 12.4 FALSE 3.08G13+G3 G13 8.34 2.8 G3 7 1.9 452.5 0.002 Circle 6 0.013 0.013 0.019 0.73 0.09 0.019 0.2502 7.6 19 FALSE 2.895G14+G17 G14 6.79 1.05 G17 5.65 0.6 151.1 0.003 Circle 6 0.013 0.0681 0.1168 1.2 0.25 0.1168 0.3062 38.1 49.7 FALSE 1.303 Attachments.xlsx/Calibration PWWF Page 4 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
240
Attachment 2
Peak Wet Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
G15+G14 G15 6.2 2.15 G14 6.79 1.05 214.7 0.005 Circle 6 0.013 0.0115 0.0097 0.2 0.15 0.0097 0.4016 2.4 29.7 FALSE 2.24G16+G15 G16 6.21 3.21 G15 6.2 2.2 154.5 0.007 Circle 6 0.013 0.0115 0.0097 0.75 0.04 0.0097 0.4536 2.1 8 FALSE 3.252G17+G2 G17 5.65 0.5 G2 4.2 0.15 143.7 0.002 Circle 6 0.013 0.0796 0.1265 1.16 0.27 0.1265 0.2769 45.7 54.4 FALSE 0.779G18+G17 G18 5.86 1.15 G17 5.65 0.57 291.5 0.002 Circle 6 0.013 0.0115 0.0097 0.8 0.05 0.0097 0.2503 3.9 10.2 FALSE 1.201G19+T23 G19 2.65 -0.76 T23 6.87 -2.3 290.9 0.005 Circle 6 0.013 0.091 0.1365 1.62 0.22 0.1365 0.4082 33.4 44.3 FALSE -0.53G20+G19 G20 2.66 0.11 G19 2.65 -0.76 173.9 0.005 Circle 6 0.013 0.0114 0.01 0.29 0.11 0.01 0.3969 2.5 22.9 FALSE 0.18G21+G20 G21 2.67 0.37 G20 2.66 0.11 51.4 0.005 Circle 6 0.013 0.0057 0.005 0.64 0.02 0.005 0.399 1.3 4.7 FALSE 0.394G22+G20 G22 2.67 0.25 G20 2.66 0.11 71.7 0.002 Circle 6 0.013 0.0057 0.005 0.67 0.04 0.005 0.2479 2 8 FALSE 0.277H2+I11 H2 7.99 0.59 I11 8.07 0.17 36.6 0.011 Circle 15 0.013 0.6282 4.0105 3.27 1.25 4.0104 6.9196 58 100 TRUE 4.428H3+H2 H3 8.2 0.7 H2 7.99 0.64 30.8 0.002 Circle 15 0.013 0.6282 4.0105 3.27 1.25 4.0104 2.851 140.7 100 TRUE 4.454H4+H3 H4 8.13 0.71 H3 8.2 0.7 7.1 0.001 Circle 15 0.013 0.4293 3.1211 2.54 1.25 3.1211 2.4242 128.7 100 TRUE 4.466H5+H4 H5 8.95 0.95 H4 8.13 0.71 259.3 0.001 Circle 15 0.013 0.4293 3.1211 2.54 1.25 3.1211 1.9652 158.8 100 TRUE 4.864H6+H5 H6 8.89 0.99 H5 8.95 0.95 9 0.004 Circle 12 0.013 0.4093 3.1012 3.95 1 3.1012 2.3751 130.6 100 TRUE 4.876H7+H75 H7 10.51 1.76 H75 10.09 1.58 89.8 0.002 Circle 12 0.013 0.4093 3.1012 3.95 1 3.1012 1.595 194.4 100 TRUE 7.337H8+H7 H8 10.95 2.05 H7 10.51 1.76 233.4 0.001 Circle 12 0.013 0.4093 3.1012 3.95 1 3.1012 1.2558 247 100 TRUE 9.044H9+H73 H9 11.84 3.09 H73 11.36 2.56 246.2 0.002 Circle 12 0.013 0.4093 3.1013 3.95 1 3.1013 1.653 187.6 100 TRUE 12.335H11+H64 H11 9.92 1.44 H64 9.05 0.99 198.2 0.002 Circle 8 0.013 0.1904 0.8515 2.44 0.67 0.8514 0.5758 147.9 100 TRUE 6.448H12+H11 H12 10.15 2.2 H11 9.92 1.54 333.5 0.002 Circle 8 0.013 0.1616 0.747 2.14 0.67 0.747 0.5375 139 100 TRUE 7.758H13+H12 H13 10.85 2.55 H12 10.15 2.3 107.9 0.002 Circle 8 0.013 0.1216 0.6412 1.84 0.67 0.6412 0.5816 110.2 100 TRUE 7.999H14+H13 H14 11.02 3.54 H13 10.85 2.65 446.5 0.002 Circle 8 0.013 0.1216 0.6412 1.84 0.67 0.6412 0.5395 118.9 100 TRUE 9.306H15+H62 H15 14.61 5.6 H62 12.95 4.64 201.4 0.005 Circle 8 0.013 0.1104 0.5888 1.69 0.67 0.5888 0.8343 70.6 100 TRUE 10.295H16+H60 H16 14.43 6.48 H60 14.57 5.9 351.2 0.002 Circle 8 0.013 0.1104 0.5484 1.57 0.67 0.5484 0.4911 111.7 100 TRUE 11.185H17+H57 H17 12.03 6.83 H57 14.21 6.69 396.8 0 Circle 8 0.013 0.1104 0.5079 1.45 0.67 0.5079 0.227 223.8 100 TRUE 11.891H18+H5 H18 8.92 1.27 H5 8.95 1.25 7.9 0.003 Circle 8 0.013 0.02 0.02 0.06 0.67 0.0332 0.608 3.3 100 TRUE 4.864H19+H18 H19 8.88 2.58 H18 8.92 1.27 386.9 0.003 Circle 8 0.013 0.02 0.02 0.06 0.67 0.0334 0.7031 2.8 100 TRUE 4.865H20+H19 H20 9.1 3.65 H19 8.88 2.63 270.8 0.004 Circle 8 0.013 0.02 0.02 0.06 0.67 0.0337 0.7416 2.7 100 TRUE 4.865H21+H56 H21 9.3 5.04 H56 9.2 4.75 143.8 0.002 Circle 6 0.013 0.005 0.01 0.81 0.05 0.01 0.252 4 10.3 FALSE 5.093H22+H21 H22 9.3 5.34 H21 9.3 5.04 151.4 0.002 Circle 6 0.013 0.005 0.01 0.81 0.05 0.01 0.2498 4 10.3 FALSE 5.394H23+H22 H23 9.4 6.15 H22 9.3 5.34 404.8 0.002 Circle 6 0.013 0.005 0.01 0.81 0.05 0.01 0.251 4 10.4 FALSE 6.202H24+H20 H24 10.14 5.82 H20 9.1 3.65 332.8 0.007 Circle 6 0.013 0.01 0 0 0.13 0 0.4531 0 26.2 TRUE 5.82H25+H11 H25 11.2 3.3 H11 9.92 1.7 378 0.004 Circle 6 0.013 0.0288 0.1045 0.53 0.5 0.1047 0.365 28.6 100 TRUE 6.449H26+H25 H26 10.63 4.58 H25 11.2 3.3 412.5 0.003 Circle 6 0.013 0.0288 0.1045 0.53 0.5 0.1045 0.3125 33.4 100 TRUE 6.45H27+H26 H27 11.38 5.66 H26 10.63 5.43 114.6 0.002 Circle 6 0.013 0.0096 0.0371 0.19 0.5 0.0372 0.2514 14.8 100 TRUE 6.45H28+H50 H28 10.4 5.41 H50 10.13 5.03 191.6 0.002 Circle 6 0.013 0.0096 0.0302 0.15 0.5 0.0304 0.2499 12.1 100 TRUE 6.45H29+H12 H29 12.43 5.83 H12 10.15 2.65 550.5 0.006 Circle 6 0.013 0.04 0.1059 0.54 0.5 0.1061 0.4264 24.8 100 TRUE 7.759H30+H46 H30 11.57 7.74 H46 11.27 7.47 135.4 0.002 Circle 6 0.013 0.015 0.0529 0.7 0.2 0.0529 0.2505 21.1 40.8 FALSE 7.944H31+H14 H31 13.28 4.5 H14 11.02 3.69 403.7 0.002 Circle 6 0.013 0.0066 0.0415 0.21 0.5 0.0415 0.2513 16.5 100 TRUE 9.327H32+H17 H32 16.06 10.26 H17 12.03 6.88 549.9 0.006 Circle 6 0.013 0.011 0.1118 0.57 0.5 0.1119 0.4399 25.4 100 TRUE 11.892H33+H32 H33 20 11.29 H32 16.06 10.26 515 0.002 Circle 6 0.013 0.0229 0.1119 0.57 0.5 0.1119 0.2509 44.6 100 TRUE 11.893H34+H17 H34 12.74 7.69 H17 12.03 6.83 268.6 0.003 Circle 6 0.013 0.1104 0.3961 2.02 0.5 0.3961 0.3175 124.8 100 TRUE 13.389H35+H34 H35 14.34 9.56 H34 12.74 7.69 321.9 0.006 Circle 6 0.013 0.1104 0.3963 2.02 0.5 0.3963 0.4276 92.7 100 TRUE 15.206H36+H35 H36 15.37 9.87 H35 14.34 9.56 473.9 0.001 Circle 6 0.013 0.0867 0.2857 1.45 0.5 0.2857 0.1435 199.1 100 TRUE 16.714H37+H36 H37 17.89 12.09 H36 15.37 9.87 370.1 0.006 Circle 6 0.013 0.0578 0.1939 0.99 0.5 0.1952 0.4345 44.6 100 TRUE 17.233H38+E42 H38 17.69 11.79 E42 14.56 10.11 518.8 0.003 Circle 6 0.013 0 0.0698 0.36 0.5 0.0706 0.3193 21.9 100 TRUE 14.699H38+H47 H38 17.69 11.79 H47 15.05 10.1 205.2 0.008 Circle 6 0.013 0.0237 0.1111 0.57 0.5 0.1665 0.5092 21.8 100 TRUE 15.277H39+H38 H39 18 12.1 H38 17.69 11.84 131.9 0.002 Circle 6 0.013 0.0187 0.102 0.52 0.5 0.102 0.2491 40.9 100 TRUE 15.277H40+H36 H40 22.17 15.97 H36 15.37 9.87 496.1 0.012 Circle 6 0.013 0.0289 0.092 0.47 0.5 0.0925 0.6222 14.8 100 TRUE 16.715H41+H40 H41 24.38 16.27 H40 22.17 15.97 150.4 0.002 Circle 6 0.013 0.0289 0.092 0.47 0.5 0.092 0.2506 36.7 100 TRUE 16.715H42+H37 H42 21.01 14.76 H37 17.89 12.19 387.7 0.007 Circle 6 0.013 0.0289 0.092 0.47 0.5 0.0921 0.4568 20.1 100 TRUE 17.233H43+H42 H43 22.12 16.57 H42 21.01 14.76 346.3 0.005 Circle 6 0.013 0.0289 0.092 0.47 0.5 0.0921 0.4056 22.7 100 TRUE 17.234H44+H37 H44 20.24 14.24 H37 17.89 12.14 272.4 0.008 Circle 6 0.013 0.0289 0.102 0.52 0.5 0.1025 0.4926 20.7 100 TRUE 17.293H45+H9 H45 12.4 3.93 H9 11.84 3.49 222.4 0.002 Circle 6 0.013 0.0046 0.01 0.05 0.5 0.0124 0.2496 4 100 TRUE 12.335H46+H52 H46 11.27 7.47 H52 12.58 6.18 360.9 0.004 Circle 6 0.013 0.015 0.0529 0.27 0.5 0.0529 0.3354 15.8 100 TRUE 7.76H47+H35 H47 15.05 10.1 H35 14.34 9.62 192.4 0.002 Circle 6 0.013 0.0237 0.1108 0.56 0.5 0.1472 0.2802 39.5 100 TRUE 15.237H48+H55 H48 9.12 6.64 H55 9.3 4.32 217.4 0.011 Circle 6 0.013 0.005 0.01 0.72 0.03 0.01 0.5796 1.7 6.9 TRUE 6.677H49+H48 H49 8.35 6.77 H48 9.12 6.72 32.6 0.002 Circle 6 0.013 0.005 0.01 0.66 0.02 0.01 0.2197 4.6 4.4 FALSE 6.807H50+H26 H50 10.13 5.03 H26 10.63 4.58 154.3 0.003 Circle 6 0.013 0.0192 0.0671 0.34 0.5 0.0676 0.303 22.1 100 TRUE 6.45H51+H50 H51 10.5 6.35 H50 10.13 5.13 189.2 0.006 Circle 6 0.013 0.0096 0.0371 0.19 0.5 0.0373 0.4505 8.2 100 TRUE 6.479H52+H29 H52 12.58 6.18 H29 12.43 5.83 94.4 0.004 Circle 6 0.013 0.04 0.1059 0.54 0.5 0.1059 0.3416 31 100 TRUE 7.759H53+H52 H53 12.4 8.3 H52 12.58 6.23 233.2 0.009 Circle 6 0.013 0.025 0.0529 0.27 0.49 0.053 0.5286 10 98.9 TRUE 8.438H54+H20 H54 9.2 4 H20 9.1 3.7 152.6 0.002 Circle 6 0.013 0.01 0.02 0.1 0.5 0.0203 0.2488 8 100 TRUE 4.866H55+H54 H55 9.3 4.32 H54 9.2 4.22 50 0.002 Circle 6 0.013 0.01 0.02 0.1 0.5 0.02 0.2509 8 100 TRUE 4.866H56+H55 H56 9.2 4.75 H55 9.3 4.32 215.8 0.002 Circle 6 0.013 0.005 0.01 0.07 0.33 0.01 0.2505 4 66.3 TRUE 4.867H57+H16 H57 14.21 6.69 H16 14.43 6.48 40.5 0.005 Circle 8 0.013 0.1104 0.5485 1.57 0.67 0.5485 0.8701 63 100 TRUE 11.188H58+H57 H58 15.13 7.62 H57 14.21 6.69 184.6 0.005 Circle 8 0.013 0 0.0406 0.12 0.67 0.0409 0.8577 4.7 100 TRUE 11.188H59+H58 H59 16.1 8.59 H58 15.13 7.62 194.6 0.005 Circle 8 0.013 0 0 0 0.67 0 0.8531 0 100 TRUE 11.188H59+H61 H59 16.1 8.59 H61 15.42 6.28 194.6 0.012 Circle 8 0.013 0 0 0 0.67 0.0352 1.3165 0 100 TRUE 10.465H60+H15 H60 14.57 5.9 H15 14.61 5.7 98.7 0.002 Circle 8 0.013 0.1104 0.5888 1.69 0.67 0.5888 0.5439 108.3 100 TRUE 10.465H61+H60 H61 15.42 6.28 H60 14.57 5.9 189.5 0.002 Circle 8 0.013 0 0.0406 0.12 0.67 0.0782 0.5411 7.5 100 TRUE 10.465 Attachments.xlsx/Calibration PWWF Page 5 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
241
Attachment 2
Peak Wet Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
H62+H14 H62 12.95 4.64 H14 11.02 3.54 232.8 0.005 Circle 8 0.013 0.115 0.5997 1.72 0.67 0.5997 0.8306 72.2 100 TRUE 9.856H63+H62 H63 13.79 5.49 H62 12.95 4.64 169.8 0.005 Circle 6 0.013 0.0046 0.011 0.06 0.5 0.0115 0.397 2.8 100 TRUE 9.856H64+H71 H64 9.05 0.99 H71 8.35 0.77 160.6 0.001 Circle 8 0.013 0.1979 0.8804 2.52 0.67 0.8804 0.4472 196.9 100 TRUE 5.463H65+H64 H65 9.89 1.83 H64 9.05 0.99 168.3 0.005 Circle 6 0.013 0.0075 0.029 0.15 0.5 0.0296 0.3964 7.3 100 TRUE 5.464H66+H65 H66 9.89 2.09 H65 9.89 1.83 51.4 0.005 Circle 6 0.013 0.0075 0.029 0.15 0.5 0.029 0.399 7.3 100 TRUE 5.464H67+H66 H67 9.89 2.32 H66 9.89 2.09 46 0.005 Circle 6 0.013 0.0025 0.01 0.05 0.5 0.01 0.3967 2.5 100 TRUE 5.465H68+H66 H68 9.89 2.42 H66 9.89 2.09 67 0.005 Circle 6 0.013 0.005 0.019 0.1 0.5 0.019 0.3938 4.8 100 TRUE 5.465H69+H68 H69 9.89 2.64 H68 9.89 2.42 45.6 0.005 Circle 6 0.013 0.0025 0.01 0.05 0.5 0.01 0.3897 2.6 100 TRUE 5.465H70+H68 H70 9.89 2.67 H68 9.89 2.42 51.2 0.005 Circle 6 0.013 0.0025 0.009 0.05 0.5 0.009 0.3921 2.3 100 TRUE 5.465H71+H3 H71 8.35 0.77 H3 8.2 0.7 35 0.002 Circle 8 0.013 0.1989 0.8894 2.55 0.67 0.8894 0.5404 164.6 100 TRUE 4.622H72+H71 H72 9.26 1.54 H71 8.35 0.77 182.4 0.004 Circle 6 0.013 0.001 0.009 0.05 0.5 0.0095 0.3645 2.5 100 TRUE 4.623H73+H74 H73 11.36 2.56 H74 11.16 2.34 101 0.002 Circle 12 0.013 0.4093 3.1013 3.95 1 3.1013 1.6627 186.5 100 TRUE 10.498H74+H8 H74 11.16 2.34 H8 10.95 2.1 112.9 0.002 Circle 12 0.013 0.4093 3.1013 3.95 1 3.1012 1.6426 188.8 100 TRUE 9.817H75+H6 H75 10.09 1.58 H6 8.89 1.04 259.7 0.002 Circle 12 0.013 0.4093 3.1012 3.95 1 3.1012 1.6245 190.9 100 TRUE 6.743I3+T19 I3 1.69 -3.99 T19 2.23 -4.27 188.4 0.001 Circle 18 0.013 0.7435 5.2299 2.96 1.5 5.2299 4.0493 129.2 100 TRUE -1.601I4+I3 I4 1.84 -3.79 I3 1.69 -3.99 242.6 0.001 Circle 18 0.013 0.7435 5.2299 2.96 1.5 5.2299 3.0159 173.4 100 TRUE -1.136I5+I31 I5 3.41 -3.42 I31 2.94 -3.53 135 0.001 Circle 18 0.013 0.7375 5.2199 2.95 1.5 5.2199 2.9983 174.1 100 TRUE -0.25I6+I5 I6 4.62 -3.08 I5 3.41 -3.42 410.7 0.001 Circle 18 0.013 0.7375 5.2199 2.95 1.5 5.2199 3.0222 172.7 100 TRUE 0.662I7+I6 I7 5.18 -2.32 I6 4.62 -3.08 259 0.003 Circle 18 0.013 0.6452 4.0421 2.29 1.5 4.0421 5.6899 71 100 TRUE 0.934I8+I7 I8 6.15 -1.45 I7 5.18 -2.32 238.1 0.004 Circle 15 0.013 0.6372 4.0354 3.29 1.25 4.0353 3.9046 103.3 100 TRUE 1.785I9+I8 I9 5.69 -1.31 I8 6.15 -1.45 154.7 0.001 Circle 15 0.013 0.6322 4.0227 3.28 1.25 4.0226 1.9432 207 100 TRUE 2.3I10+I9 I10 7.26 -0.74 I9 5.69 -1.31 221.1 0.003 Circle 15 0.013 0.6282 4.0104 3.27 1.25 4.0104 3.2797 122.3 100 TRUE 3.043I11+I10 I11 8.07 -0.03 I10 7.26 -0.74 379.8 0.002 Circle 15 0.013 0.6282 4.0105 3.27 1.25 4.0104 2.7928 143.6 100 TRUE 4.409I12+I6 I12 4.46 -2.19 I6 4.62 -2.83 338.5 0.002 Circle 12 0.013 0.0873 1.1728 1.49 1 1.1728 1.5491 75.7 100 TRUE 0.985I13+I12 I13 5.54 -1.56 I12 4.46 -2.14 319.8 0.002 Circle 12 0.013 0.0873 1.1728 1.49 1 1.1728 1.5172 77.3 100 TRUE 1.25I14+I13 I14 4.22 -0.83 I13 5.54 -1.51 443.5 0.002 Circle 12 0.013 0.0025 0.897 1.14 1 0.897 1.395 64.3 100 TRUE 1.447I15+I14 I15 5.32 -0.53 I14 4.22 -0.78 386 0.001 Circle 12 0.013 0.0025 0.897 1.14 1 0.897 0.9067 98.9 100 TRUE 1.603I16+I6 I16 4.85 0.96 I6 4.62 -2.38 492.8 0.007 Circle 6 0.013 0.005 0.005 0.03 0.5 0.0058 0.4619 1.1 100 TRUE 1.018I17+I7 I17 5.54 1.51 I7 5.18 -1.27 525.8 0.005 Circle 6 0.013 0.008 0.005 0.03 0.5 0.0051 0.408 1.2 100 TRUE 1.546I18+I8 I18 5.2 1.01 I8 6.15 -0.65 236.8 0.007 Circle 6 0.013 0.005 0.0088 0.05 0.5 0.015 0.4698 1.9 100 TRUE 1.785I19+I18 I19 6.48 1.59 I18 5.2 1.11 238.8 0.002 Circle 6 0.013 0.005 0.005 0.03 0.44 0.005 0.2516 2 87.1 TRUE 1.785I20+I9 I20 5.86 1.26 I9 5.69 -0.81 278.4 0.007 Circle 6 0.013 0.004 0.005 0.03 0.5 0.0081 0.4838 1 100 TRUE 2.301I21+I24 I21 7.17 1.52 I24 7 -0.08 364.1 0.004 Circle 6 0.013 0.0636 0.197 1 0.5 0.1972 0.3719 53 100 TRUE 2.456I22+I23 I22 8.69 3.44 I23 8.52 3.17 44.5 0.006 Circle 6 0.013 0.0212 0.059 1.11 0.16 0.0605 0.437 13.5 31.5 FALSE 3.597I23+I27 I23 8.52 3.12 I27 8.3 2.86 80.1 0.003 Circle 6 0.013 0.0424 0.128 1.31 0.25 0.128 0.3197 40 49.8 FALSE 3.379I24+I13 I24 7 -0.08 I13 5.54 -0.56 236.9 0.002 Circle 6 0.013 0.0848 0.2759 1.4 0.5 0.2759 0.2526 109.2 100 TRUE 1.933I25+I24 I25 7 0.22 I24 7 -0.08 153.5 0.002 Circle 6 0.013 0.0212 0.0789 0.4 0.5 0.0817 0.248 31.8 100 TRUE 1.945I26+I23 I26 9.29 4.04 I23 8.52 3.27 153.5 0.005 Circle 6 0.013 0.0212 0.069 1.15 0.17 0.0705 0.3974 17.4 34.5 FALSE 4.214I27+I28 I27 8.3 2.86 I28 8.04 2.57 89.9 0.003 Circle 6 0.013 0.0424 0.128 1.29 0.25 0.1289 0.3187 40.2 50.4 FALSE 3.117I28+I21 I28 8.04 2.57 I21 7.17 1.57 311.5 0.003 Circle 6 0.013 0.0636 0.197 1 0.5 0.197 0.3179 62 100 TRUE 2.909I29+I28 I29 8.81 3.34 I28 8.04 2.57 153.5 0.005 Circle 6 0.013 0.0212 0.069 1.11 0.18 0.069 0.3974 17.4 35.4 FALSE 3.516I31+I4 I31 2.94 -3.53 I4 1.84 -3.79 321.1 0.001 Circle 18 0.013 0.7435 5.2299 2.96 1.5 5.2299 2.9889 175 100 TRUE -0.445I32+I31 I32 3.97 -2.18 I31 2.94 -3.26 207.6 0.005 Circle 6 0.013 0.006 0.01 0.05 0.5 0.012 0.4047 2.5 100 TRUE -0.444I33+I32 I33 4.43 -1.73 I32 3.97 -2.18 90.2 0.005 Circle 6 0.013 0.002 0.005 0.03 0.5 0.005 0.3963 1.3 100 TRUE -0.444I34+I32 I34 4.56 -1.6 I32 3.97 -2.18 117.2 0.005 Circle 6 0.013 0.004 0.005 0.03 0.5 0.0051 0.3947 1.3 100 TRUE -0.444I43+I15 I43 5.62 0.12 I15 5.32 -0.53 61.7 0.011 Circle 12 0.013 0.0025 0.897 1.14 1 0.897 3.6566 24.5 100 TRUE 1.607J5+T21 J5 4.44 -1.06 T21 3.07 -3.03 585.4 0.003 Circle 6 0.013 0.0417 0.0772 1.02 0.2 0.0772 0.3255 23.7 40.8 TRUE -0.857J6+J5 J6 5.85 0.6 J5 4.44 -0.96 558.5 0.003 Circle 6 0.013 0.0417 0.0772 0.97 0.21 0.0772 0.2965 26 42.6 FALSE 0.816J7+J6 J7 5.96 1.9 J6 5.85 1.02 441.1 0.002 Circle 6 0.013 0.0133 0.0227 0.7 0.11 0.0227 0.2506 9.1 22.2 FALSE 2.012J8+J6 J8 7.5 2.81 J6 5.85 0.7 442.1 0.005 Circle 6 0.013 0.0284 0.0545 0.99 0.16 0.0545 0.3876 14.1 32.4 FALSE 2.974J9+J8 J9 8.19 3.23 J8 7.5 2.81 400.5 0.001 Circle 6 0.013 0.0284 0.0545 0.56 0.25 0.0545 0.1817 30 49.3 FALSE 3.478J10+J9 J10 9.91 4.26 J9 8.19 3.34 299.8 0.003 Circle 6 0.013 0.0284 0.0545 0.83 0.18 0.0546 0.3108 17.5 36.9 FALSE 4.444J11+T20 J11 1.31 -2.3 T20 2.72 -3.58 282.4 0.005 Circle 8 0.013 0.0145 0.029 0.08 0.67 0.0293 0.8135 3.6 100 TRUE -1.982J12+J11 J12 1.94 -1.61 J11 1.31 -2.2 299.4 0.002 Circle 8 0.013 0.0145 0.029 0.62 0.13 0.029 0.5364 5.4 19.1 FALSE -1.48J13+J12 J13 2.73 -0.51 J12 1.94 -1.51 298.6 0.003 Circle 8 0.013 0.0145 0.0291 0.72 0.11 0.0291 0.6993 4.2 17.2 FALSE -0.397J14+J13 J14 3.27 -0.03 J13 2.73 -0.41 190 0.002 Circle 8 0.013 0.0145 0.029 0.65 0.12 0.0292 0.5404 5.4 18.6 FALSE 0.097K1+T15 K1 2.02 -6.28 T15 2.75 -6.5 20.4 0.011 Circle 14 0.013 0.3785 1.5059 1.41 1.17 1.5092 5.5807 27 100 TRUE -5.086K2+K1 K2 3.35 -5.2 K1 2.02 -6.28 451.1 0.002 Circle 14 0.013 0.3785 1.5059 2.51 0.64 1.5059 2.6295 57.3 54.8 TRUE -4.555K3+K2 K3 4.05 -4.8 K2 3.35 -5.2 189.7 0.002 Circle 12 0.013 0.3785 1.5059 2.6 0.69 1.5059 1.6359 92.1 69.2 FALSE -4.044K4+K3 K4 3.55 -4.1 K3 4.05 -4.8 238.3 0.003 Circle 12 0.013 0.3765 1.4959 2.69 0.67 1.4959 1.9309 77.5 66.7 FALSE -3.424K5+K4 K5 3.31 -3.39 K4 3.55 -4.1 248.1 0.003 Circle 12 0.013 0.1743 0.3979 1.77 0.33 0.398 1.9058 20.9 32.8 FALSE -3.062K6+K5 K6 4.44 -2.86 K5 3.31 -3.39 251.1 0.002 Circle 12 0.013 0.1606 0.3614 1.57 0.33 0.3615 1.6368 22.1 33.5 FALSE -2.52K7+K6 K7 3.35 -1.85 K6 4.44 -2.66 362.1 0.002 Circle 8 0.013 0.0076 0.02 0.72 0.09 0.02 0.5715 3.5 13.4 FALSE -1.759K8+K7 K8 2.87 -1.18 K7 3.35 -1.85 355.5 0.002 Circle 8 0.013 0.0076 0.02 0.67 0.09 0.02 0.5246 3.8 14 FALSE -1.085K9+K8 K9 3.87 -0.58 K8 2.87 -1.18 355.9 0.002 Circle 8 0.013 0.0076 0.02 0.64 0.1 0.02 0.4961 4 14.4 FALSE -0.481K10+K9 K10 4.11 0.11 K9 3.87 -0.48 155.5 0.004 Circle 6 0.013 0.0046 0.01 0.73 0.04 0.01 0.3456 2.9 7.3 FALSE 0.155K11+K5 K11 3.67 -2.23 K5 3.31 -2.99 369.8 0.002 Circle 6 0.013 0.0077 0.0205 0.72 0.1 0.0205 0.2544 8.1 20.1 FALSE -2.128K12+K11 K12 3.54 -0.86 K11 3.67 -2.08 353.5 0.003 Circle 6 0.013 0.0077 0.0205 0.91 0.09 0.0205 0.3296 6.2 17.1 FALSE -0.77K13+K12 K13 2.97 0.27 K12 3.54 -0.86 362 0.003 Circle 6 0.013 0.0077 0.0205 0.87 0.09 0.0205 0.3135 6.5 17.7 FALSE 0.362 Attachments.xlsx/Calibration PWWF Page 6 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
242
Attachment 2
Peak Wet Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
K14+K13 K14 3.19 0.45 K13 2.97 0.27 90.4 0.002 Circle 6 0.013 0.0077 0.0205 0.75 0.1 0.0205 0.2504 8.2 19.7 FALSE 0.551K15+K9 K15 3.43 -0.33 K9 3.87 -0.48 73.9 0.002 Circle 6 0.013 0.003 0.01 0.79 0.05 0.01 0.2528 4 9.7 FALSE -0.278K16+K4 K16 3.55 -2.65 K4 3.55 -3.45 273.7 0.003 Circle 6 0.013 0.008 0.0205 0.75 0.1 0.0205 0.3033 6.8 19.7 FALSE -2.555K17+K16 K17 2.92 -1.88 K16 3.55 -2.6 267.2 0.003 Circle 6 0.013 0.0062 0.0205 0.75 0.1 0.0205 0.2913 7 19.7 FALSE -1.784K18+K17 K18 3.64 -1.31 K17 2.92 -1.88 268.7 0.002 Circle 6 0.013 0.0062 0.0205 0.72 0.1 0.0205 0.2584 7.9 20.3 FALSE -1.209K19+K18 K19 3.25 -0.65 K18 3.64 -1.31 272 0.002 Circle 6 0.013 0.0062 0.0205 0.73 0.1 0.0207 0.2764 7.4 20 FALSE -0.552K20+K19 K20 2.67 -0.53 K19 3.25 -0.6 134.6 0.001 Circle 6 0.013 0.0062 0.0205 0.94 0.07 0.0205 0.128 16 13.5 FALSE -0.407K21+K3 K21 3.15 -2.1 K3 4.05 -4.25 246.4 0.009 Circle 6 0.013 0.002 0.01 0.73 0.04 0.01 0.5241 1.9 7.3 FALSE -2.061K22+K21 K22 3.29 -1.16 K21 3.15 -2.05 256.2 0.003 Circle 6 0.013 0.001 0.005 0.69 0.03 0.005 0.3307 1.5 6.7 FALSE -1.132K23+K22 K23 3.52 -0.91 K22 3.29 -1.11 99.5 0.002 Circle 6 0.013 0.001 0.005 0.66 0.03 0.005 0.2516 2 5.4 FALSE -0.883K24+K21 K24 3.55 -1.7 K21 3.15 -2 148.6 0.002 Circle 6 0.013 0.001 0.005 0.65 0.03 0.005 0.2521 2 5.1 FALSE -1.673K25+K5 K25 3.6 -1.7 K5 3.31 -3.09 376.2 0.004 Circle 6 0.013 0.006 0.016 0.91 0.07 0.016 0.3411 4.7 13.2 FALSE -1.629K26+K6 K26 4.36 -1.29 K6 4.44 -2.76 293.6 0.005 Circle 6 0.013 0.0208 0 0 0 0.0093 0.397 0 0 FALSE -1.156K27+K26 K27 3.95 -0.6 K26 4.36 -1.29 199.5 0.003 Circle 6 0.013 0 0 0 0 0.0241 0.33 0 0 FALSE -0.474K28+K4 K28 3.27 -4 K4 3.55 -4.1 242 0 Circle 10 0.013 0.196 1.0776 1.98 0.83 1.0776 0.4454 242 100 TRUE -2.84K30+K31 K30 3.78 -3.21 K31 3.08 -3.43 108.2 0.002 Circle 8 0.013 0.028 0.119 0.34 0.67 0.1197 0.5449 21.8 100 TRUE -2.286K31+L1 K31 3.08 -3.43 L1 2.82 -3.73 147.8 0.002 Circle 8 0.013 0.028 0.119 0.34 0.67 0.1197 0.5444 21.9 100 TRUE -2.287K32+K30 K32 3.16 -2.76 K30 3.78 -3.21 226.9 0.002 Circle 8 0.013 0.028 0.119 0.34 0.67 0.1195 0.5381 22.1 100 TRUE -2.286K33+K32 K33 2.74 -2.37 K32 3.16 -2.76 130.8 0.003 Circle 6 0.013 0.011 0.0595 0.53 0.28 0.0595 0.3064 19.4 55.9 FALSE -2.178K34+K33 K34 3.08 -1.54 K33 2.74 -2.37 278.4 0.003 Circle 6 0.013 0.011 0.0595 0.86 0.19 0.0595 0.3064 19.4 38.3 FALSE -1.349K35+K34 K35 2.78 -0.7 K34 3.08 -1.54 279.8 0.003 Circle 6 0.013 0.011 0.0595 0.86 0.19 0.0595 0.3074 19.4 38.2 FALSE -0.509K36+K35 K36 2.75 0.15 K35 2.78 -0.7 281.5 0.003 Circle 6 0.013 0.011 0.0595 0.86 0.19 0.0596 0.3083 19.3 38.2 FALSE 0.34K37+K32 K37 2.51 -1.01 K32 3.16 -2.76 350.2 0.005 Circle 6 0.013 0.017 0.0595 1.01 0.17 0.0595 0.3966 15 33.9 FALSE -0.844L1+L21 L1 2.82 -3.73 L21 2.74 -3.95 223.2 0.001 Circle 10 0.013 0.196 1.0776 1.98 0.83 1.0776 0.6878 156.7 100 TRUE -2.287L2+L1 L2 2.72 -3.28 L1 2.82 -3.73 178.7 0.003 Circle 10 0.013 0.168 0.9586 1.76 0.83 0.9586 1.0994 87.2 100 TRUE -2.025L3+L2 L3 2.93 -3.17 L2 2.72 -3.28 83.4 0.001 Circle 10 0.013 0.168 0.9586 1.76 0.83 0.9586 0.7957 120.5 100 TRUE -1.955L4+L3 L4 3.39 -2.3 L3 2.93 -3.12 247.6 0.003 Circle 10 0.013 0.1123 0.5071 1.07 0.67 0.5071 1.2608 40.2 80.9 TRUE -1.862L5+L47 L5 4.17 -1.38 L47 3.21 -2.04 276.3 0.002 Circle 6 0.013 0.021 0.068 0.86 0.21 0.068 0.2742 24.8 42.5 FALSE -1.165L6+L5 L6 4.69 -0.51 L5 4.17 -1.38 214.9 0.004 Circle 6 0.013 0.015 0.034 0.95 0.12 0.034 0.357 9.5 23.7 FALSE -0.379L7+L6 L7 5.31 -0.39 L6 4.69 -0.51 260.6 0 Circle 6 0.013 0.015 0.034 0.47 0.2 0.034 0.1204 28.2 39.5 FALSE -0.158L8+L7 L8 5.39 -0.24 L7 5.31 -0.39 72.8 0.002 Circle 6 0.013 0.015 0.034 0.64 0.16 0.034 0.2547 13.3 31.5 FALSE -0.082L9+L4 L9 3.42 -1.78 L4 3.39 -2.05 162.3 0.002 Circle 6 0.013 0.0409 0.2351 1.36 0.41 0.2351 0.2288 102.7 82.5 FALSE -1.318L10+K27 L10 3.59 0.24 K27 3.95 -0.55 197.2 0.004 Circle 6 0.013 0 0 0 0 0.0032 0.3551 0 0 FALSE 0.24L10+L9 L10 3.59 -0.76 L9 3.42 -1.78 274.7 0.004 Circle 6 0.013 0.01 0.0694 1 0.19 0.0694 0.3419 20.3 38.3 FALSE -0.568L11+L10 L11 4.97 0.57 L10 3.59 -0.56 359.8 0.003 Circle 6 0.013 0.01 0.0696 0.96 0.2 0.0697 0.3144 22.1 39.7 FALSE 0.771L12+L11 L12 4.97 0.62 L11 4.97 0.57 81.8 0.001 Circle 6 0.013 0.01 0.0536 0.88 0.17 0.0542 0.1387 38.6 34.9 FALSE 0.864L13+L9 L13 4.47 -0.58 L9 3.42 -1.73 310.9 0.004 Circle 6 0.013 0.0309 0.1657 1.49 0.28 0.1657 0.3412 48.6 55.2 FALSE -0.302L14+L13 L14 5.25 0.6 L13 4.47 -0.58 301.6 0.004 Circle 6 0.013 0.0309 0.1657 1.52 0.27 0.1657 0.351 47.2 54.2 FALSE 0.873L15+L14 L15 6.17 1.92 L14 5.25 0.6 310.2 0.004 Circle 6 0.013 0.0309 0.1657 1.57 0.26 0.1657 0.366 45.3 52.9 FALSE 2.186L16+L15 L16 7.37 2.67 L15 6.17 1.92 311.1 0.002 Circle 6 0.013 0.0309 0.1657 1.26 0.32 0.1658 0.2755 60.2 63.3 FALSE 2.992L17+L16 L17 7.38 3.53 L16 7.37 2.67 236.3 0.004 Circle 6 0.013 0.0294 0.16 1.48 0.27 0.16 0.3385 47.3 54.1 FALSE 3.804L18+L17 L18 8.22 4.37 L17 7.38 3.53 330.9 0.003 Circle 6 0.013 0.0294 0.16 1.27 0.31 0.16 0.2827 56.6 61 FALSE 4.677L19+L18 L19 9.56 5.51 L18 8.22 4.37 332.7 0.003 Circle 6 0.013 0.0294 0.16 1.43 0.28 0.16 0.3284 48.7 55.5 FALSE 5.787L20+L16 L20 8.52 2.97 L16 7.37 2.77 101.4 0.002 Circle 6 0.013 0.0015 0.0058 0.15 0.12 0.0058 0.2492 2.3 24.5 FALSE 3.001L21+K28 L21 2.74 -3.95 K28 3.27 -4 68.3 0.001 Circle 10 0.013 0.196 1.0776 1.98 0.83 1.0776 0.5928 181.8 100 TRUE -2.769L22+L3 L22 3.32 -0.13 L3 2.93 -2.72 365.6 0.007 Circle 6 0.013 0.013 0.0255 0.68 0.01 0.0261 0.4722 5.4 2 TRUE 0.003L23+L3 L23 3.05 -2.75 L3 2.93 -3.02 351.1 0.001 Circle 8 0.013 0.0427 0.4197 1.2 0.67 0.4197 0.3351 125.3 100 TRUE -1.508L24+L23 L24 2.38 -2.17 L23 3.05 -2.75 386.3 0.002 Circle 8 0.013 0.0427 0.4197 1.2 0.67 0.4197 0.4682 89.6 100 TRUE -1.062L25+L24 L25 3.54 -1.91 L24 2.38 -2.17 342 0.001 Circle 8 0.013 0.0427 0.4197 1.2 0.67 0.4197 0.3332 126 100 TRUE -0.676L26+L25 L26 3.77 -1.38 L25 3.54 -1.91 215.6 0.002 Circle 8 0.013 0.037 0.282 0.81 0.67 0.282 0.5991 47.1 100 TRUE -0.627L27+L26 L27 3.7 -0.86 L26 3.77 -1.38 260.1 0.002 Circle 8 0.013 0.028 0.158 0.64 0.44 0.158 0.5403 29.2 66.2 TRUE -0.57L28+L27 L28 3.81 0.26 L27 3.7 -0.86 362.9 0.003 Circle 6 0.013 0.014 0.079 1.01 0.21 0.079 0.3117 25.3 41.8 FALSE 0.47L29+L28 L29 4.59 1.14 L28 3.81 0.26 366 0.002 Circle 6 0.013 0.014 0.079 0.92 0.22 0.079 0.2751 28.7 44.8 FALSE 1.364L30+L27 L30 3.71 -0.19 L27 3.7 -0.86 236 0.003 Circle 6 0.013 0.014 0.079 0.98 0.22 0.079 0.299 26.4 43 FALSE 0.025L31+L30 L31 4.39 0.64 L30 3.71 -0.19 178.8 0.005 Circle 6 0.013 0.014 0.079 1.2 0.18 0.079 0.3823 20.7 36.9 FALSE 0.828L32+L31 L32 5.42 1.62 L31 4.39 0.64 293.5 0.003 Circle 6 0.013 0.014 0.079 1.04 0.21 0.079 0.3242 24.4 41.2 FALSE 1.828L33+L32 L33 5.85 1.8 L32 5.42 1.62 90.7 0.002 Circle 6 0.013 0.014 0.079 0.9 0.23 0.0796 0.25 31.6 45.8 FALSE 2.035L34+L26 L34 4.66 -0.24 L26 3.77 -1.28 287.3 0.004 Circle 6 0.013 0.009 0.124 1.36 0.24 0.124 0.3376 36.7 47.2 TRUE 0.005L35+L34 L35 5.3 0.7 L34 4.66 -0.24 253.5 0.004 Circle 6 0.013 0 0.11 1.26 0.23 0.11 0.3417 32.2 45.6 FALSE 0.929L36+L35 L36 5.75 1.65 L35 5.3 0.7 277.7 0.003 Circle 6 0.013 0 0.11 1.22 0.23 0.11 0.3282 33.5 46.6 FALSE 1.884L37+L36 L37 6.21 2.76 L36 5.75 1.65 322.8 0.003 Circle 6 0.013 0 0 0 0 0 0.329 0 0 FALSE 2.76L37+L38 L37 6.21 2.76 L38 5.64 2.24 210.4 0.002 Circle 6 0.013 0 0 0 0 0 0.2789 0 0 FALSE 2.76L38+L39 L38 5.64 2.24 L39 4.89 1.54 215.2 0.003 Circle 6 0.013 0 0.12 1.26 0.24 0.12 0.32 37.5 48.8 FALSE 2.487L39+L40 L39 4.89 1.54 L40 4.16 0.81 345.7 0.002 Circle 6 0.013 0 0.12 1.06 0.28 0.12 0.2578 46.5 55.9 FALSE 1.821L40+L42 L40 4.16 0.61 L42 3.25 0.2 345.8 0.001 Circle 8 0.013 0.0017 0.1249 0.88 0.29 0.125 0.4161 30 42.8 FALSE 0.899L41+L40 L41 6.09 0.95 L40 4.16 0.81 70.6 0.002 Circle 6 0.013 0.0017 0.0049 0.64 0.02 0.0049 0.2499 2 4.7 FALSE 0.977L42+L43 L42 3.25 0.2 L43 2.56 -0.34 330.1 0.002 Circle 8 0.013 0.0017 0.125 0.98 0.26 0.125 0.4887 25.6 39.3 FALSE 0.464L43+L44 L43 2.56 -0.34 L44 3.5 -0.85 334.4 0.002 Circle 8 0.013 0.0017 0.125 0.95 0.27 0.125 0.4719 26.5 40.1 FALSE -0.071L44+L45 L44 3.5 -0.85 L45 2.57 -1.33 238.4 0.002 Circle 8 0.013 0.0017 0.125 0.55 0.42 0.125 0.5422 23 62.3 FALSE -0.6 Attachments.xlsx/Calibration PWWF Page 7 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
243
Attachment 2
Peak Wet Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
L45+L25 L45 2.57 -1.38 L25 3.54 -1.76 201.8 0.002 Circle 8 0.013 0.0057 0.1377 0.39 0.67 0.1377 0.5244 26.3 100 TRUE -0.675L46+L45 L46 2.92 -0.93 L45 2.57 -1.23 136 0.002 Circle 6 0.013 0.004 0.0128 0.07 0.41 0.0128 0.2635 4.8 81 TRUE -0.675L47+L4 L47 3.21 -2.04 L4 3.39 -2.3 88 0.003 Circle 8 0.013 0.0714 0.272 1.62 0.32 0.272 0.6568 41.4 48.5 FALSE -1.711L48+L47 L48 3.22 -1.35 L47 3.21 -2.04 228.9 0.003 Circle 8 0.013 0.0504 0.204 1.49 0.28 0.204 0.6634 30.7 41.4 FALSE -1.072L49+L48 L49 4.08 -1.2 L48 3.22 -1.35 233.3 0.001 Circle 8 0.013 0.0504 0.204 0.99 0.38 0.204 0.3064 66.6 56.9 FALSE -0.788L50+L49 L50 4.26 -0.68 L49 4.08 -1.2 223.6 0.002 Circle 8 0.013 0.0504 0.204 1.35 0.3 0.204 0.5827 35 44.6 FALSE -0.378L51+L50 L51 3.85 -0.28 L50 4.26 -0.68 79.7 0.005 Circle 6 0.013 0.0013 0.0077 0.27 0.1 0.0077 0.3975 1.9 20.3 FALSE -0.245L52+L50 L52 4.54 -0.36 L50 4.26 -0.68 223.9 0.001 Circle 6 0.013 0.0491 0.1963 1.17 0.4 0.1963 0.2121 92.5 79.9 FALSE 0.071L53+L52 L53 5.4 0.6 L52 4.54 -0.36 218.4 0.004 Circle 6 0.013 0.0491 0.1963 1.69 0.29 0.1963 0.372 52.8 57.2 FALSE 0.892L54+L53 L54 6.47 2.07 L53 5.4 0.6 369.4 0.004 Circle 6 0.013 0.037 0.0935 1.21 0.21 0.0935 0.3539 26.4 41.6 FALSE 2.281L55+L54 L55 6.53 2.37 L54 6.47 2.07 148.7 0.002 Circle 6 0.013 0.0177 0.0425 0.62 0.19 0.0425 0.252 16.9 38 FALSE 2.56L56+L54 L56 7.59 3.34 L54 6.47 2.17 326.7 0.004 Circle 6 0.013 0.0193 0.051 0.84 0.17 0.0511 0.3358 15.2 34.8 FALSE 3.512L57+L53 L57 5.49 1.29 L53 5.4 0.65 202.8 0.003 Circle 6 0.013 0.0121 0.1028 1.16 0.23 0.1028 0.3152 32.6 46 FALSE 1.523L58+L57 L58 6.75 2.35 L57 5.49 1.29 295.3 0.004 Circle 6 0.013 0.0121 0.1028 1.21 0.22 0.1028 0.3362 30.6 44.8 FALSE 2.574L59+L58 L59 7.91 3.31 L58 6.75 2.35 250 0.004 Circle 6 0.013 0.0121 0.1028 1.24 0.22 0.103 0.3477 29.6 43.9 FALSE 3.531L60+L59 L60 8.08 3.53 L59 7.91 3.31 108.8 0.002 Circle 6 0.013 0.0121 0.1028 1.02 0.26 0.1028 0.2523 40.7 51.1 FALSE 3.792L61+L5 L61 4.57 -0.73 L5 4.17 -1.13 152.5 0.003 Circle 6 0.013 0.006 0.034 0.71 0.15 0.034 0.2874 11.8 29.3 FALSE -0.581L62+L34 L62 4.95 0.45 L34 4.66 -0.19 146.7 0.004 Circle 6 0.013 0.009 0.014 0.66 0.08 0.014 0.3706 3.8 16.4 FALSE 0.515M2+I43 M2 5.62 0.3 I43 5.62 0.22 42.2 0.002 Circle 10 0.013 0.0025 0.897 1.64 0.83 0.897 0.9539 94 100 TRUE 1.611M2+N1 M2 5.62 2.62 N1 5.32 2.32 82 0.004 Circle 12 0.013 0 0 0 0.03 0 2.1549 0 2.5 FALSE 2.66M3+M2 M3 6.98 1.33 M2 5.62 0.3 379.8 0.003 Circle 8 0.013 0.0015 0.8973 2.57 0.67 0.8973 0.6293 142.6 100 TRUE 3.687M4+M31 M4 9.9 3 M31 7 2.52 142.5 0.003 Circle 8 0.013 0.0122 0.6174 1.77 0.67 0.6174 0.7013 88 100 TRUE 6.051M5+M4 M5 11.95 3.9 M4 9.9 3.05 372.5 0.002 Circle 8 0.013 0.0519 0.6174 1.77 0.67 0.6174 0.5772 107 100 TRUE 7.038M6+M22 M6 12.3 6.22 M22 12.3 5.54 341.1 0.002 Circle 10 0.013 0.0744 0.3512 0.64 0.83 0.3513 0.9782 35.9 100 TRUE 7.047M7+M6 M7 12.4 6.45 M6 12.3 6.22 115.5 0.002 Circle 10 0.013 0.0979 0.3513 0.71 0.71 0.3513 0.9777 35.9 85.5 FALSE 7.048M8+M7 M8 14.41 7.71 M7 12.4 6.45 192.5 0.007 Circle 10 0.013 0.1057 0.3513 2.36 0.26 0.3521 1.7725 19.8 31.7 FALSE 7.979M12+M40 M12 14.95 7.4 M40 13.27 5.72 338.8 0.005 Circle 8 0.013 0.041 0.2462 0.92 0.48 0.2466 0.8509 28.9 71.9 TRUE 7.665M13+M12 M13 16.33 8.78 M12 14.95 7.4 275.6 0.005 Circle 8 0.013 0.0368 0.2463 1.92 0.26 0.2466 0.8551 28.8 39.6 FALSE 9.045M14+M5 M14 10.14 5.82 M5 11.95 3.95 327.8 0.006 Circle 6 0.013 0.001 0.02 0.1 0.5 0.0209 0.4238 4.7 100 TRUE 7.038M16+M8 M16 14.85 8.05 M8 14.41 7.81 19.7 0.012 Circle 6 0.013 0.0005 0.01 0.44 0.09 0.01 0.6193 1.6 17.4 FALSE 8.086M18+M5 M18 12 4.51 M5 11.95 4.2 153.9 0.002 Circle 10 0.013 0.0696 0.3512 0.64 0.83 0.3513 0.9833 35.7 100 TRUE 7.039M19+M18 M19 12.1 4.7 M18 12 4.51 94.8 0.002 Circle 10 0.013 0.063 0.3512 0.64 0.83 0.3513 0.9808 35.8 100 TRUE 7.04M20+M19 M20 12.2 4.86 M19 12.1 4.7 78 0.002 Circle 10 0.013 0.0706 0.3512 0.64 0.83 0.3513 0.9923 35.4 100 TRUE 7.042M21+M20 M21 12.3 5.45 M20 12.2 4.86 296.6 0.002 Circle 10 0.013 0.074 0.3512 0.64 0.83 0.3513 0.9771 35.9 100 TRUE 7.044M22+M21 M22 12.3 5.54 M21 12.3 5.45 43.3 0.002 Circle 10 0.013 0.0885 0.3512 0.64 0.83 0.3513 0.9988 35.2 100 TRUE 7.045M23+M24 M23 7.5 4.92 M24 7.4 4.53 195 0.002 Circle 8 0.013 0.0387 0.28 0.8 0.67 0.28 0.5404 51.8 100 TRUE 5.999M24+M25 M24 7.4 4.56 M25 7.3 4.04 260 0.002 Circle 8 0.013 0.0327 0.28 0.8 0.67 0.28 0.5404 51.8 100 TRUE 5.969M25+M26 M25 7.3 4.04 M26 7.3 3.5 270 0.002 Circle 8 0.013 0.0371 0.28 0.8 0.67 0.28 0.5404 51.8 100 TRUE 5.909M26+M27 M26 7.3 3.5 M27 7.2 3.25 124.9 0.002 Circle 8 0.013 0.022 0.28 0.8 0.67 0.28 0.5406 51.8 100 TRUE 5.907M27+M29 M27 7.2 3.25 M29 7.1 3.18 35.2 0.002 Circle 8 0.013 0.0237 0.28 0.8 0.67 0.28 0.5389 52 100 TRUE 5.906M28+N11 M28 7.3 0.37 N11 7.2 -0.1 236.4 0.002 Circle 8 0.013 0.0031 0.0109 0.78 0.04 0.0109 0.5388 2 6.7 FALSE 0.425M29+M31 M29 7.1 3.18 M31 7 2.52 328.8 0.002 Circle 8 0.013 0.0373 0.28 0.8 0.67 0.28 0.5414 51.7 100 TRUE 5.905M30+N29 M30 7.3 0.64 N29 7.2 0.13 255.2 0.002 Circle 8 0.013 0.006 0.0109 0.74 0.06 0.0109 0.5402 2 8.7 FALSE 0.696M31+M3 M31 7 2.52 M3 6.98 1.33 357.1 0.003 Circle 8 0.013 0.0033 0.8973 2.57 0.67 0.8973 0.6975 128.6 100 TRUE 5.733M32+M33 M32 7.3 2.88 M33 7.3 2.49 195 0.002 Circle 8 0.013 0.0062 0.0123 0.84 0.05 0.0123 0.5404 2.3 8.2 FALSE 2.942M33+M34 M33 7.3 2.49 M34 7.2 1.91 287.6 0.002 Circle 8 0.013 0.0062 0.0123 0.7 0.06 0.0123 0.5426 2.3 9.7 FALSE 2.552M34+N22 M34 7.2 1.91 N22 7.1 1.4 253.5 0.002 Circle 8 0.013 0.011 0.0246 0.64 0.11 0.0246 0.542 4.5 16.6 FALSE 2.022M35+M34 M35 7.2 2.16 M34 7.2 1.91 123.6 0.002 Circle 8 0.013 0.0048 0.0123 0.76 0.06 0.0123 0.5434 2.3 9.2 FALSE 2.221M36+M37 M36 7.3 3.24 M37 7.4 2.73 256.6 0.002 Circle 8 0.013 0.0108 0.0287 0.62 0.13 0.0288 0.5387 5.3 19 FALSE 3.366M37+N24 M37 7.4 2.73 N24 7.3 2.21 259.3 0.002 Circle 8 0.013 0.0108 0.0287 0.62 0.13 0.0289 0.5411 5.3 19 FALSE 2.859M38+M39 M38 19.58 12.03 M39 18.79 11.24 153 0.005 Circle 8 0.013 0.0532 0.2464 1.95 0.26 0.2472 0.8683 28.4 39 FALSE 12.291M39+M43 M39 18.79 11.24 M43 17.59 10.04 240 0.005 Circle 8 0.013 0.0367 0.2465 1.94 0.26 0.2466 0.8544 28.8 39.2 FALSE 11.505M40+M5 M40 13.27 5.72 M5 11.95 4.4 265.2 0.005 Circle 8 0.013 0.0284 0.2465 0.71 0.67 0.2465 0.8525 28.9 100 TRUE 7.039M41+M13 M41 16.89 9.34 M13 16.33 8.78 109.7 0.005 Circle 8 0.013 0.0449 0.2463 1.94 0.26 0.2464 0.8633 28.5 39.3 FALSE 9.604M42+M41 M42 17.07 9.82 M41 16.89 9.34 37 0.013 Circle 8 0.013 0.0401 0.2463 2.71 0.2 0.2464 1.3763 17.9 30.7 FALSE 10.029M43+M42 M43 17.59 10.04 M42 17.07 9.82 103 0.002 Circle 8 0.013 0.0458 0.2463 1.49 0.32 0.2465 0.5585 44.1 48 FALSE 10.373METERING STATION+T2 METERING STATION 0 -14.66 T2 3.04 -14.76 444.9 0 Circle 24 0.013 1.7982 8.9574 3.04 1.77 8.9574 3.3914 264.1 88.7 TRUE -12.603N1+K6 N1 5.32 -2.08 K6 4.44 -2.86 253.3 0.003 Circle 12 0.013 0.153 0.3379 1.75 0.29 0.338 1.977 17.1 29.4 FALSE -1.781N2+N1 N2 5.71 -1.39 N1 5.32 -2.08 295.7 0.002 Circle 10 0.013 0.153 0.3725 1.66 0.36 0.3725 1.0583 35.2 43 FALSE -1.03N3+N21 N3 6 -0.64 N21 6 -0.82 88.8 0.002 Circle 10 0.013 0.1316 0.3152 1.6 0.32 0.3152 0.9864 32 38.9 FALSE -0.301N4+N3 N4 6.14 0.24 N3 6 -0.64 334.7 0.003 Circle 10 0.013 0.1316 0.3152 1.64 0.32 0.3152 1.1234 28.1 38.3 FALSE 0.564N5+N4 N5 7.28 1.13 N4 6.14 0.29 332.5 0.003 Circle 10 0.013 0.1098 0.2619 1.51 0.3 0.2619 1.1012 23.8 35.5 FALSE 1.427N6+N5 N6 8.64 1.99 N5 7.28 1.13 332.5 0.003 Circle 10 0.013 0.1098 0.2619 1.52 0.29 0.2619 1.1142 23.5 35.2 FALSE 2.285N7+N6 N7 9.69 2.84 N6 8.64 1.99 332.7 0.003 Circle 10 0.013 0.1098 0.2619 1.52 0.29 0.2619 1.1074 23.7 35.4 FALSE 3.136N8+N9 N8 13.8 4.05 N9 11.48 3.68 118.7 0.003 Circle 10 0.013 0.1098 0.2619 1.64 0.28 0.262 1.2232 21.4 33.4 FALSE 4.331N9+N7 N9 11.48 3.68 N7 9.69 2.84 284 0.003 Circle 10 0.013 0.1098 0.2619 1.6 0.28 0.2619 1.1915 22 34 FALSE 3.965N10+N13 N10 7.1 -0.52 N13 7 -0.88 176 0.002 Circle 8 0.013 0.006 0.0109 0.78 0.06 0.0109 0.5465 2 8.4 FALSE -0.464N11+N12 N11 7.2 -0.1 N12 7.1 -0.56 227.2 0.002 Circle 8 0.013 0.0062 0.0218 0.77 0.09 0.0218 0.5437 4 13.6 FALSE 0.001N12+N13 N12 7.1 -0.56 N13 7 -0.88 157.9 0.002 Circle 8 0.013 0.0062 0.0218 0.69 0.1 0.0218 0.544 4 14.6 FALSE -0.46 Attachments.xlsx/Calibration PWWF Page 8 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
244
Attachment 2
Peak Wet Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
N13+N14 N13 7 -0.88 N14 6 -1.21 167 0.002 Circle 8 0.013 0.0122 0.0327 0.35 0.21 0.0327 0.5371 6.1 31.1 FALSE -0.737N14+N2 N14 6 -1.21 N2 5.71 -1.39 88.4 0.002 Circle 10 0.013 0.153 0.3725 1.72 0.35 0.3725 0.9886 37.7 41.8 FALSE -0.838N15+N16 N15 7.3 0.75 N16 7.2 0.25 251.8 0.002 Circle 8 0.013 0.0046 0.0123 0.72 0.06 0.0123 0.5385 2.3 9.5 FALSE 0.812N16+N17 N16 7.2 0.25 N17 7.1 -0.21 228.2 0.002 Circle 8 0.013 0.0046 0.0123 0.81 0.05 0.0123 0.5425 2.3 7.6 FALSE 0.311N17+N20 N17 7.1 -0.27 N20 7 -0.67 197 0.002 Circle 8 0.013 0.0046 0.0123 0.74 0.06 0.0123 0.5445 2.3 9.4 FALSE -0.208N18+N19 N18 7.2 0.29 N19 7.1 -0.22 255.9 0.002 Circle 8 0.013 0.0046 0.0123 0.72 0.06 0.0123 0.5394 2.3 9.5 FALSE 0.352N19+N20 N19 7.1 -0.22 N20 7 -0.67 224.1 0.002 Circle 8 0.013 0.0046 0.0123 0.82 0.05 0.0123 0.5415 2.3 7.7 FALSE -0.159N20+N21 N20 7 -0.67 N21 6 -0.82 72 0.002 Circle 8 0.013 0.0092 0.0246 0.17 0.29 0.0246 0.5515 4.5 43.2 FALSE -0.457N21+N14 N21 6 -0.82 N14 6 -1.21 195.8 0.002 Circle 10 0.013 0.1408 0.3398 1.54 0.35 0.3398 0.9778 34.8 42.5 FALSE -0.457N22+N23 N22 7.1 1.4 N23 7.1 0.98 212 0.002 Circle 8 0.013 0.011 0.0246 0.7 0.1 0.0246 0.5378 4.6 15.7 FALSE 1.511N23+N28 N23 7.1 0.98 N28 7 0.59 193.2 0.002 Circle 8 0.013 0.011 0.0246 0.69 0.11 0.0246 0.5429 4.5 15.8 FALSE 1.09N24+N25 N24 7.3 2.21 N25 7.3 1.98 116.3 0.002 Circle 8 0.013 0.0108 0.0287 0.63 0.13 0.0288 0.5374 5.3 18.9 FALSE 2.337N25+N26 N25 7.3 1.98 N26 7.2 1.46 262.5 0.002 Circle 8 0.013 0.0108 0.0287 0.62 0.13 0.0288 0.5378 5.3 19 FALSE 2.107N26+N27 N26 7.2 1.46 N27 7.1 0.96 247.5 0.002 Circle 8 0.013 0.0108 0.0287 0.71 0.11 0.0287 0.5431 5.3 17.2 FALSE 1.585N27+N28 N27 7.1 0.96 N28 7 0.59 183 0.002 Circle 8 0.013 0.0108 0.0287 0.64 0.12 0.0287 0.5433 5.3 18.7 FALSE 1.086N28+N4 N28 7 0.59 N4 6.14 0.29 150.3 0.002 Circle 8 0.013 0.0218 0.0533 0.67 0.19 0.0533 0.5398 9.9 27.9 FALSE 0.774N29+N10 N29 7.2 0.13 N10 7.1 -0.52 325.6 0.002 Circle 8 0.013 0.006 0.0109 0.72 0.06 0.0109 0.5399 2 8.8 FALSE 0.186N30+N11 N30 7.3 0.17 N11 7.2 -0.1 134 0.002 Circle 8 0.013 0.0031 0.0109 0.79 0.06 0.0109 0.5424 2 8.3 FALSE 0.226O3+N8 O3 17.6 8.2 N8 13.8 4.1 205.1 0.02 Circle 8 0.013 0.1098 0.2615 2.75 0.19 0.2623 1.7084 15.3 28.2 FALSE 8.392O4+O3 O4 15.39 9.13 O3 17.6 8.3 277.4 0.003 Circle 8 0.013 0.0912 0.2128 1.51 0.28 0.2128 0.661 32.2 42.4 FALSE 9.415O5+O4 O5 14.73 10.25 O4 15.39 9.13 398.6 0.003 Circle 8 0.013 0.0912 0.2125 1.47 0.29 0.2126 0.6405 33.2 43.1 FALSE 10.54O6+O5 O6 13.82 11.05 O5 14.73 10.25 399.4 0.002 Circle 8 0.013 0.0912 0.2126 1.3 0.32 0.2126 0.5408 39.3 47.5 FALSE 11.369O7+O6 O7 15.16 11.56 O6 13.82 11.05 426.9 0.001 Circle 8 0.013 0.0912 0.2126 1.09 0.36 0.2126 0.4177 50.9 54.7 FALSE 11.933O8+O59 O8 16.28 12.23 O59 16.36 11.92 102.7 0.003 Circle 8 0.013 0.0788 0.1798 1.43 0.26 0.1798 0.6639 27.1 38.9 FALSE 12.496O9+O8 O9 17.01 12.76 O8 16.28 12.23 139.7 0.004 Circle 6 0.013 0.0711 0.1588 1.48 0.27 0.1588 0.3456 46 53.5 FALSE 13.03O10+O9 O10 17.95 13.1 O9 17.01 12.76 156.6 0.002 Circle 8 0.013 0.0711 0.1588 1.21 0.27 0.1588 0.563 28.2 40.3 FALSE 13.373O11+O10 O11 19.41 14.01 O10 17.95 13.15 259.2 0.003 Circle 8 0.013 0.0543 0.1445 1.34 0.23 0.1445 0.696 20.8 34.7 FALSE 14.242O12+O11 O12 19.9 14.5 O11 19.41 14.01 394.2 0.001 Circle 8 0.013 0.0543 0.1445 0.94 0.3 0.1445 0.426 33.9 45.2 FALSE 14.803O13+O12 O13 22.22 16.47 O12 19.9 14.5 414.6 0.005 Circle 8 0.013 0.0543 0.1445 1.53 0.21 0.1445 0.8329 17.3 31.5 FALSE 16.683O14+O13 O14 21.75 17.35 O13 22.22 16.87 129.7 0.004 Circle 8 0.013 0.0105 0.0279 0.88 0.1 0.0282 0.7351 3.8 14.6 FALSE 17.455O15+O14 O15 24.85 19.05 O14 21.75 17.35 307.9 0.006 Circle 8 0.013 0.0105 0.0279 0.87 0.1 0.03 0.8979 3.1 14.8 FALSE 19.143O16+O15 O16 28.01 22.56 O15 24.85 19.2 234.7 0.014 Circle 6 0.013 0.0105 0.0279 1.04 0.08 0.0309 0.6713 4.2 15.9 FALSE 22.645O17+O3 O17 10.93 8.62 O3 17.6 8.3 161.2 0.002 Circle 8 0.013 0.0186 0.0493 0.66 0.18 0.0493 0.5384 9.2 26.7 FALSE 8.8O18+O17 O18 15.83 11.93 O17 10.93 8.62 264 0.013 Circle 8 0.013 0.0051 0.0136 0.74 0.04 0.0136 1.353 1 5.3 FALSE 11.966O19+O17 O19 17.6 10.75 O17 10.93 8.62 85.9 0.025 Circle 6 0.013 0.0135 0.0357 1.09 0.08 0.0362 0.8835 4 16.6 FALSE 10.84O20+O19 O20 17 10.98 O19 17.6 10.75 115.6 0.002 Circle 6 0.013 0.0042 0.0057 0.68 0.03 0.0057 0.2503 2.3 6.2 FALSE 11.011O21+O19 O21 20.09 12.64 O19 17.6 10.75 393.6 0.005 Circle 6 0.013 0.0093 0.0302 0.97 0.11 0.0302 0.3888 7.8 21.5 FALSE 12.761O22+O21 O22 20 13.27 O21 20.09 12.64 318.2 0.002 Circle 6 0.013 0.0093 0.03 0.64 0.14 0.0302 0.2497 12 28.9 FALSE 13.418O23+O22 O23 21.65 15.65 O22 20 13.27 469.8 0.005 Circle 6 0.013 0.0093 0.0301 0.89 0.11 0.0301 0.3993 7.5 22.8 FALSE 15.768O24+O23 O24 21.18 15.84 O23 21.65 15.65 96.7 0.002 Circle 6 0.013 0.0093 0.03 0.67 0.14 0.03 0.2487 12.1 27.9 FALSE 15.983O25+O7 O25 16.12 12.07 O7 15.16 11.61 177.4 0.003 Circle 6 0.013 0.0124 0.0328 0.76 0.14 0.0335 0.2857 11.5 27.2 FALSE 12.222O26+O25 O26 18.86 13.26 O25 16.12 12.12 332.8 0.003 Circle 6 0.013 0.0031 0.0131 0.8 0.07 0.0141 0.3284 4 13.8 FALSE 13.324O27+O26 O27 19.94 13.44 O26 18.86 13.31 65.4 0.002 Circle 6 0.013 0.0031 0.0066 0.68 0.03 0.0066 0.2502 2.6 6 FALSE 13.475O28+O26 O28 19 14.28 O26 18.86 13.41 434.3 0.002 Circle 6 0.013 0 0.0065 0.7 0.03 0.0079 0.2511 2.6 6.8 FALSE 14.333O29+O28 O29 23 19.53 O28 19 14.28 174 0.03 Circle 6 0.013 0 0 0 0 0 0.9746 0 0 FALSE 19.544O29+O30 O29 23 19.53 O30 22.78 19.08 226 0.002 Circle 6 0.013 0 0 0 0.04 0 0.2504 0 7.4 FALSE 19.599O30+O35 O30 22.78 17.63 O35 21.74 16.44 175.9 0.007 Circle 6 0.013 0.0168 0.0492 0.99 0.05 0.0492 0.4615 10.7 9.8 FALSE 17.699O31+O30 O31 23 18.76 O30 22.78 18.58 89.5 0.002 Circle 6 0.013 0.009 0.0164 0.8 0.08 0.0164 0.2516 6.5 16.1 FALSE 18.845O32+O31 O32 24 19.18 O31 23 18.76 210.5 0.002 Circle 6 0.013 0.009 0.0164 0.83 0.08 0.0164 0.2506 6.5 15.6 FALSE 19.264O33+O32 O33 25 19.71 O32 24 19.18 262.5 0.002 Circle 6 0.013 0.009 0.0164 0.76 0.08 0.0165 0.2521 6.5 16.7 FALSE 19.793O34+O10 O34 23.33 14.69 O10 17.95 13.35 267.7 0.005 Circle 6 0.013 0.0168 0.0492 1.09 0.07 0.0492 0.397 12.4 13.9 FALSE 14.769O35+O34 O35 21.74 16.44 O34 23.33 14.69 316.4 0.006 Circle 6 0.013 0.0168 0.0492 1.08 0.07 0.0492 0.4173 11.8 13.5 FALSE 16.519O36+O30 O36 24.12 18.01 O30 22.78 17.68 164.4 0.002 Circle 6 0.013 0.0077 0.0164 0.78 0.08 0.0164 0.2514 6.5 16.3 FALSE 18.093O37+O25 O37 16.63 12.23 O25 16.12 12.07 80.9 0.002 Circle 6 0.013 0.0093 0.0197 0.71 0.1 0.0197 0.2495 7.9 19.8 FALSE 12.334O38+O37 O38 17.23 12.46 O37 16.63 12.23 117.5 0.002 Circle 6 0.013 0.0031 0.0066 0.71 0.04 0.0066 0.2482 2.6 7 FALSE 12.495O39+O37 O39 16.48 12.31 O37 16.63 12.23 40.8 0.002 Circle 6 0.013 0.0062 0.0131 0.88 0.06 0.0131 0.2484 5.3 12.8 FALSE 12.377O40+O39 O40 16.65 12.38 O39 16.48 12.31 37.3 0.002 Circle 6 0.013 0.0031 0.0066 0.28 0.09 0.0066 0.2431 2.7 17.7 FALSE 12.434O41+O40 O41 16.5 12.47 O40 16.65 12.38 44.5 0.002 Circle 6 0.013 0.0031 0.0066 0.64 0.02 0.0066 0.2523 2.6 4.2 FALSE 12.502O42+O39 O42 16.78 12.41 O39 16.48 12.31 47.6 0.002 Circle 6 0.013 0.0031 0.0066 0.65 0.02 0.0066 0.2572 2.6 4.8 FALSE 12.445O43+O42 O43 17.92 13.6 O42 16.78 12.41 181.9 0.007 Circle 6 0.013 0.0031 0.0066 0.65 0.02 0.0066 0.4538 1.4 4.5 FALSE 13.628O44+O43 O44 18.13 13.78 O43 17.92 13.64 69.2 0.002 Circle 6 0.013 0.0031 0.0066 0.69 0.03 0.0066 0.2524 2.6 6.2 FALSE 13.815O45+O8 O45 17.06 12.55 O8 16.28 12.23 65.8 0.005 Circle 6 0.013 0.0078 0.021 0.69 0.11 0.021 0.3913 5.4 21.2 FALSE 12.64O46+O45 O46 18 13.61 O45 17.06 12.55 212.5 0.005 Circle 6 0.013 0.0016 0.007 0.75 0.04 0.007 0.3963 1.8 8.5 FALSE 13.647O47+O45 O47 16.84 12.91 O45 17.06 12.55 71.5 0.005 Circle 6 0.013 0.0062 0.014 0.85 0.06 0.014 0.3981 3.5 11.3 FALSE 12.973O48+O47 O48 17.43 13.52 O47 16.84 12.91 122 0.005 Circle 6 0.013 0.0016 0.007 0.69 0.03 0.007 0.3967 1.8 6.3 FALSE 13.552O49+O47 O49 17.41 13.27 O47 16.84 12.91 72.6 0.005 Circle 6 0.013 0.0047 0.007 0.68 0.03 0.007 0.3951 1.8 5.9 FALSE 13.304O50+O49 O50 17.95 14.13 O49 17.41 13.27 172.1 0.005 Circle 6 0.013 0.0047 0.007 0.63 0.02 0.007 0.3966 1.8 3.9 FALSE 14.159O51+O13 O51 24.5 18.4 O13 22.22 16.57 467.6 0.004 Circle 6 0.013 0.0438 0.1166 1.32 0.23 0.1166 0.351 33.2 45.9 FALSE 18.633O52+O51 O52 26.81 19.11 O51 24.5 18.4 213.3 0.003 Circle 6 0.013 0.029 0.0772 1.04 0.2 0.0772 0.3237 23.8 40.3 FALSE 19.315 Attachments.xlsx/Calibration PWWF Page 9 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
245
Attachment 2
Peak Wet Weather Flow Model Results
Label Start Node
Rim (Start)
(ft)
Invert
(Start) (ft) Stop Node
Rim (Stop)
(ft)
Invert
(Stop) (ft) Length (ft)
Slope
(Calculated)
(ft/ft)
Section
Type
Diameter
(in) Manning's n
Flow
(Middle)
(cfs)
Velocity
(ft/s)
Depth
(Middle) (ft)
Flow
(Maximum)
(cfs)
Capacity
(Full Flow)
(cfs)
Flow /
Capacity
(Design) (%) Depth/Rise (%)
Depth
(Maximum) /
Rise (%)
Is Ever
Surcharged?
Hydraulic
Grade
(Maximum) (ft)
O53+O52 O53 27 19.48 O52 26.81 19.11 188.5 0.002 Circle 6 0.013 0.0145 0.01 0.81 0.05 0.01 0.2486 4 10.5 FALSE 19.533O54+O52 O54 31.19 20.39 O52 26.81 19.11 380.1 0.003 Circle 6 0.013 0.0145 0.0672 0.97 0.19 0.0672 0.3256 20.6 38.4 FALSE 20.584O55+O54 O55 28.75 20.95 O54 31.19 20.44 399.4 0.001 Circle 6 0.013 0.0145 0.0672 0.68 0.25 0.0672 0.2005 33.5 50.4 FALSE 21.204O56+O55 O56 27.04 22.24 O55 28.75 20.95 376.5 0.003 Circle 6 0.013 0.0145 0.0672 0.97 0.19 0.0674 0.3284 20.5 38.2 FALSE 22.431O57+O51 O57 25.61 19.76 O51 24.5 18.4 365.2 0.004 Circle 6 0.013 0.0148 0.0394 0.78 0.15 0.0394 0.3424 11.5 30.3 FALSE 19.916O58+O57 O58 26.81 20.57 O57 25.61 19.76 403.4 0.002 Circle 6 0.013 0.0148 0.0394 0.61 0.18 0.0394 0.2514 15.7 36.4 FALSE 20.752O59+O7 O59 16.36 11.92 O7 15.16 11.56 182.3 0.002 Circle 8 0.013 0.0788 0.1798 1.22 0.29 0.1798 0.537 33.5 43.8 FALSE 12.214O60+O61 O60 15.68 9.18 O61 14.55 7.85 199 0.007 Circle 14 0.013 0.1346 0.3413 2.29 0.23 0.3413 4.3933 7.8 19.7 FALSE 9.411O61+M8 O61 14.55 7.85 M8 14.41 7.81 11.8 0.003 Circle 14 0.013 0.1272 0.3413 2 0.25 0.3413 3.1288 10.9 21.7 FALSE 8.112O62+O18 O62 17.08 13.18 O18 15.83 11.93 249 0.005 Circle 6 0.013 0.0051 0.0136 0.89 0.07 0.0136 0.3975 3.4 13.1 FALSE 13.241O63+O62 O63 17.27 13.37 O62 17.08 13.18 38 0.005 Circle 6 0.013 0.0051 0.0136 0.85 0.06 0.0136 0.3967 3.4 11.4 FALSE 13.427T1+T0 T1 4.57 -15.43 T0 #N/A -17.68 329.2 0.007 Circle 24 0.013 1.7982 8.9574 5.86 0.98 8.9573 18.7015 47.9 48.9 FALSE -14.443T2+T1 T2 3.04 -14.76 T1 4.57 -15.43 505.8 0.001 Circle 24 0.013 1.7982 8.9574 3.62 1.47 8.9574 8.2331 108.8 73.4 FALSE -13.154T3+METERING STATION T3 2.52 -14.63 METERING STATION 0 -14.66 55 0.001 Circle 24 0.013 1.7982 8.9574 2.85 2 8.9574 5.2832 169.5 100 TRUE -12.567T4+T3 T4 1.41 -12.09 T3 2.52 -14.63 474.9 0.005 Circle 24 0.013 1.7982 8.9575 5.17 1.08 8.9574 16.5436 54.1 54.1 TRUE -11.029T5+T4 T5 0.16 -11.76 T4 1.41 -11.99 352.3 0.001 Circle 24 0.013 1.7982 8.9575 3.5 1.52 8.9574 5.7799 155 75.9 FALSE -10.07T6+T5 T6 0.17 -11.38 T5 0.16 -11.66 382.1 0.001 Circle 24 0.013 1.7982 8.9575 3.21 1.66 8.9575 6.1236 146.3 83.1 FALSE -9.585T7+T6 T7 -0.07 -10.42 T6 0.17 -11.28 480.8 0.002 Circle 24 0.013 1.7982 8.9575 3.48 1.52 8.9575 9.5671 93.6 76.2 FALSE -8.882T8+T7 T8 0.14 -10.08 T7 -0.07 -10.32 501.9 0 Circle 24 0.013 1.7982 8.9576 3.19 1.67 8.9575 4.9467 181.1 83.7 FALSE -8.151T9+T8 T9 0.14 -9.67 T8 0.14 -9.98 497.7 0.001 Circle 24 0.013 1.7982 8.9576 2.94 1.86 8.9575 5.6456 158.7 93 TRUE -7.593T10+T9 T10 0.07 -9.12 T9 0.14 -9.57 446.9 0.001 Circle 24 0.013 1.7982 8.9576 2.93 1.88 8.9576 7.1782 124.8 93.8 FALSE -7.153T11+T10 T11 -0.24 -8.44 T10 0.07 -9.02 325.8 0.002 Circle 24 0.013 1.7982 8.9577 3.25 1.64 8.9576 9.5445 93.9 81.8 FALSE -6.828T12+T11 T12 0.55 -8.25 T11 -0.24 -8.49 482.2 0 Circle 24 0.013 1.7982 8.9578 3.01 1.8 8.9577 5.0467 177.5 89.8 TRUE -6.246T13+T12 T13 2.14 -7.3 T12 0.55 -8.25 504 0.002 Circle 24 0.013 1.7982 8.9578 3.16 1.69 8.9578 9.8211 91.2 84.6 TRUE -5.69T14+T13 T14 7.1 -7.1 T13 2.14 -7.3 478.1 0 Circle 24 0.013 1.7982 8.9579 3.03 1.78 8.9578 4.6267 193.6 89.2 TRUE -5.092T15+T14 T15 2.75 -12.9 T14 7.1 -7.9 93 -0.054 Circle 24 0.013 1.7982 8.9579 2.85 2 8.9578 52.4516 17.1 100 TRUE -5.092T16+T15 T16 1.34 -6.26 T15 2.75 -6.38 34.4 0.003 Circle 21 0.013 1.4197 7.4519 4.08 1.24 7.4519 9.358 79.6 71 FALSE -5.062T17+T16 T17 0.96 -5.84 T16 1.34 -6.26 481.7 0.001 Circle 21 0.013 1.4197 7.452 3.29 1.56 7.4519 4.6785 159.3 89.2 TRUE -4.01T18+T17 T18 1.12 -5.23 T17 0.96 -5.79 540.4 0.001 Circle 21 0.013 1.4197 7.452 3.1 1.75 7.4519 5.1004 146.1 100 TRUE -3.002T19+T18 T19 2.23 -4.72 T18 1.12 -5.23 500 0.001 Circle 21 0.013 1.4197 7.452 3.1 1.75 7.4519 5.0602 147.3 100 TRUE -2.02T20+T19 T20 2.72 -3.98 T19 2.23 -4.62 331.9 0.002 Circle 18 0.013 0.6762 2.2221 1.26 1.5 2.2221 4.6124 48.2 100 TRUE -1.983T21+T20 T21 3.07 -3.43 T20 2.72 -3.98 338.4 0.002 Circle 18 0.013 0.6617 2.1931 1.24 1.5 2.1931 4.2346 51.8 100 TRUE -1.948T22+T21 T22 2.81 -3.39 T21 3.07 -3.43 197.4 0 Circle 18 0.013 0.62 2.1159 1.2 1.47 2.1159 1.4952 141.5 97.8 FALSE -1.939T23+T22 T23 6.87 -3.03 T22 2.81 -3.29 446 0.001 Circle 18 0.013 0.62 2.116 1.36 1.23 2.116 2.5361 83.4 82 FALSE -1.897T24+T23 T24 3.66 -2.69 T23 6.87 -2.93 316.7 0.001 Circle 18 0.013 0.529 1.9796 1.74 0.92 1.9796 2.8915 68.5 61.3 FALSE -1.77T25+T24 T25 3.95 -2.59 T24 3.66 -2.62 282.2 0 Circle 18 0.013 0.529 1.9796 1.76 0.91 1.9796 1.083 182.8 60.7 FALSE -1.599T26+T25 T26 7.03 -2.32 T25 3.95 -2.52 305.6 0.001 Circle 18 0.013 0.465 1.792 1.75 0.84 1.792 2.6871 66.7 56.1 FALSE -1.454T27+T26 T27 7.85 -2.05 T26 7.03 -2.22 355.8 0 Circle 18 0.013 0.465 1.792 1.81 0.82 1.792 2.296 78.1 54.7 FALSE -1.173T28+T27 T28 8.67 -1.93 T27 7.85 -1.95 162.1 0 Circle 18 0.013 0.465 1.792 1.95 0.77 1.792 1.1667 153.6 51.6 FALSE -1.082T29+T28 T29 4.98 -1.62 T28 8.67 -1.93 233.8 0.001 Circle 18 0.013 0.465 1.792 2.1 0.73 1.792 3.8248 46.9 48.7 FALSE -0.888AbbreviationsPWWF: Peak Wet Weather FlowCFS: Cubic Feet per Secondft: Feets: Secondsin: Inches Attachments.xlsx/Calibration PWWF Page 10 of 10
Freyer and Laureta, Inc.

Last printed: 5/13/2025
246
FREYER & LAURETA, INC. Civil Engineers · Surveyors · Construction Managers.

APPENDIX C

FLOW DEMAND CALCULATIONS
Scenario 1: 2025 Flow Demand Calculations
Scenario 2: 2035 Flow Demand Calculations
Scenario 3: 2035 Enhanced Flow Demand Calculations
247
Appendix C: Table 1
Land Use Changes - 2014 Zoning versus Proposed 2035 Zoning APN Address 2014 Zoning (2) 2035 Zoning (3)
063-121-400 2091 BAY RD, EAST PALO ALTO Parks/Recreation/Conservation Office 063-122-030 BAY RD, EAST PALO ALTO Parks/Recreation/Conservation Office 063-132-140 1905 BAY RD, EAST PALO ALTO Parks/Recreation/Conservation Mixed Use Corridor 063-111-250 1675 BAY RD, EAST PALO ALTO
Low Density Residential
Office
Mixed Use High
Mixed Use High
063-111-230 Parks/Recreation/Conservation Mixed Use High 063-103-310 1585 BAY RD, EAST PALO ALTO Office Mixed Use High 113-530-999 Low Density Residential High Density Residential 113-530-040 2426 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-530-050 2428 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-530-020 2422 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-530-030 2424 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-530-060 2430 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-530-010 2420 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-710-060 2450 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-710-040 2446 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-710-020 2442 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-710-030 2444 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-710-010 2440 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-710-050 2448 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-710-999 Low Density Residential High Density Residential 113-720-999 Low Density Residential High Density Residential 113-720-030 2464 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-720-010 2460 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-720-040 2466 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-720-020 2462 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-740-050 2478 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-740-020 2472 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-740-999 Low Density Residential High Density Residential 113-740-070 2482 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-740-080 2484 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-740-030 2474 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-740-010 2470 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-740-040 2476 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 113-740-060 2480 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 063-103-440 2400 GLORIA WAY, EAST PALO ALTO Low Density Residential High Density Residential 063-090-020 1423-1425A BAY RD, EAST PALO ALTO Medium Density Residential Parks/Recreation/Conservation 063-090-060 Low Density Residential Public/Institutional 063-090-080 Low Density Residential Public/Institutional 063-231-220 1800 BAY RD, EAST PALO ALTO Office Mixed Use Corridor 063-231-240 1804 BAY RD, EAST PALO ALTO Office Mixed Use Corridor 063-231-250 1798 BAY RD, EAST PALO ALTO Office Mixed Use Corridor 063-232-350 901 WEEKS ST, EAST PALO ALTO Office Mixed Use High 063-232-210 WEEKS ST, EAST PALO ALTO Office High Density Residential 063-232-220 WEEKS ST, EAST PALO ALTO Office High Density Residential 063-232-230 WEEKS ST, EAST PALO ALTO Office High Density Residential 063-232-260 1001 WEEKS ST, EAST PALO ALTO Office High Density Residential 063-232-090 1003 WEEKS ST, EAST PALO ALTO Office High Density Residential 063-232-240 1045 WEEKS ST, EAST PALO ALTO Office High Density Residential 063-232-150 2421 PULGAS AVE, EAST PALO ALTO Office High Density Residential 063-232-300 1095 WEEKS ST, EAST PALO ALTO Office High Density Residential 063-232-250 1085 WEEKS ST, EAST PALO ALTO Office High Density Residential 063-232-160 2447 PULGAS AVE, EAST PALO ALTO Office High Density Residential 063-221-180 2371 CLARKE AVE, EAST PALO ALTO Low Density Residential High Density Residential 063-221-190 2369 CLARKE AVE, EAST PALO ALTO Low Density Residential High Density Residential 063-221-200 891 WEEKS ST, EAST PALO ALTO Low Density Residential High Density Residential 063-221-220 867 WEEKS ST, EAST PALO ALTO Low Density Residential High Density Residential 063-221-210 871 WEEKS ST, EAST PALO ALTO Low Density Residential High Density Residential 063-221-230 865 WEEKS ST, EAST PALO ALTO Low Density Residential High Density Residential 063-221-500 863 WEEKS ST, EAST PALO ALTO Low Density Residential High Density Residential 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 1 of 9 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 248
Appendix C: Table 1
Land Use Changes - 2014 Zoning versus Proposed 2035 Zoning APN Address 2014 Zoning (2) 2035 Zoning (3)
063-221-240 Low Density Residential High Density Residential 063-221-250 831 WEEKS ST, EAST PALO ALTO Low Density Residential High Density Residential 063-221-260 819 JAMIE LN, EAST PALO ALTO Low Density Residential High Density Residential 063-221-270 823 JAMIE LN, EAST PALO ALTO Low Density Residential High Density Residential 063-221-280 827 JAMIE LN, EAST PALO ALTO Low Density Residential High Density Residential 063-221-320 817 PAUL ROBESON CT, EAST PALO ALTO Low Density Residential High Density Residential 063-221-310 815 PAUL ROBESON CT, EAST PALO ALTO Low Density Residential High Density Residential 063-221-300 813 PAUL ROBESON CT, EAST PALO ALTO Low Density Residential High Density Residential 063-221-290 811 PAUL ROBESON CT, EAST PALO ALTO Low Density Residential High Density Residential 063-221-380 809 PAUL ROBESON CT, EAST PALO ALTO Low Density Residential High Density Residential 063-221-370 807 PAUL ROBESON CT, EAST PALO ALTO Low Density Residential High Density Residential 063-221-360 805 PAUL ROBESON CT, EAST PALO ALTO Low Density Residential High Density Residential 063-221-350 803 PAUL ROBESON CT, EAST PALO ALTO Low Density Residential High Density Residential 063-221-340 801 WEEKS ST, EAST PALO ALTO Low Density Residential High Density Residential 063-221-390 791 WEEKS ST, EAST PALO ALTO Low Density Residential High Density Residential 063-221-550 785 CAROLE CT, EAST PALO ALTO Low Density Residential High Density Residential 063-221-540 779 CAROLE CT, EAST PALO ALTO Low Density Residential High Density Residential 063-221-530 773 CAROLE CT, EAST PALO ALTO Low Density Residential High Density Residential 063-221-520 767 CAROLE CT, EAST PALO ALTO Low Density Residential High Density Residential 063-221-510 761 WEEKS ST, EAST PALO ALTO Low Density Residential High Density Residential 063-221-410 731 WEEKS ST, EAST PALO ALTO Low Density Residential High Density Residential 063-221-420 717 WEEKS ST, EAST PALO ALTO Low Density Residential High Density Residential 063-221-430 2360 COOLEY AVE, EAST PALO ALTO Low Density Residential High Density Residential 063-221-440 2362-2362 COOLEY AVE, EAST PALO ALTO Low Density Residential High Density Residential 063-221-450 2364 COOLEY AVE, EAST PALO ALTO Low Density Residential High Density Residential 063-203-210 585 WEEKS ST, EAST PALO ALTO Commercial Mixed Use High 063-203-220 579 WEEKS ST, EAST PALO ALTO Commercial Low Density Residential 063-203-230 563 WEEKS ST, EAST PALO ALTO Commercial Low Density Residential 063-203-240 549 WEEKS ST, EAST PALO ALTO Commercial Low Density Residential 063-203-250 541 WEEKS ST, EAST PALO ALTO Commercial Low Density Residential 063-203-260 533 WEEKS ST, EAST PALO ALTO Commercial Low Density Residential 063-203-270 Commercial Low Density Residential
063-203-390 1518 BAY RD, EAST PALO ALTO Commercial Medium Density Residential 063-203-370 1508 BAY RD, EAST PALO ALTO Commercial Medium Density Residential 063-203-350 1574 BAY RD, EAST PALO ALTO Commercial Medium Density Residential 063-203-410 1568 BAY RD, EAST PALO ALTO Commercial Medium Density Residential 063-203-400 1560 BAY RD, EAST PALO ALTO Commercial Medium Density Residential 063-203-440 1554 BAY RD, EAST PALO ALTO Commercial Medium Density Residential 063-203-360 1546 BAY RD, EAST PALO ALTO Commercial Medium Density Residential 063-203-450 1538 BAY RD, EAST PALO ALTO Commercial Medium Density Residential 063-203-430 1530 BAY RD, EAST PALO ALTO Commercial Medium Density Residential 063-203-380 Commercial Medium Density Residential
063-202-280
2361-2369 UNIVERSITY AVE 101-308,
EAST PALO ALTO High Density Residential Mixed Use Corridor 063-202-160 561 SACRAMENTO ST, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-202-100 566 WEEKS ST, EAST PALO ALTO High Density Residential Low Density Residential 063-202-090 564 WEEKS ST, EAST PALO ALTO High Density Residential Low Density Residential 063-202-080 556 WEEKS ST, EAST PALO ALTO High Density Residential Low Density Residential 063-201-270 578 SACRAMENTO ST, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-201-240 2343 UNIVERSITY AVE, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-201-220 2337 UNIVERSITY AVE, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-201-090 576 SACRAMENTO ST, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-201-080 566 SACRAMENTO ST, EAST PALO ALTO High Density Residential Low Density Residential 063-201-290 2331 UNIVERSITY AVE, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-201-250 RUNNYMEDE ST, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-201-260 RUNNYMEDE ST, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-210-630 2358 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-210-450 2377 COOLEY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-210-410 2371 COOLEY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-210-340 2369 COOLEY AVE, EAST PALO ALTO Commercial High Density Residential 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 2 of 9 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 249
Appendix C: Table 1
Land Use Changes - 2014 Zoning versus Proposed 2035 Zoning APN Address 2014 Zoning (2) 2035 Zoning (3)
063-210-350 2365 COOLEY AVE, EAST PALO ALTO Commercial High Density Residential 063-210-480 2361 COOLEY AVE, EAST PALO ALTO Commercial High Density Residential 063-210-490 2355 COOLEY AVE, EAST PALO ALTO Commercial High Density Residential 063-210-310 2346 UNIVERSITY AVE, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-210-380 2354 UNIVERSITY AVE, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-210-520 2338 UNIVERSITY AVE, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-070 2330 UNIVERSITY AVE # 160, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-200 2330 UNIVERSITY AVE # 290, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-020 2330 UNIVERSITY AVE # 110, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-010 2330 UNIVERSITY AVE # 100, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-260 2330 UNIVERSITY AVE # 350, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-170 2330 UNIVERSITY AVE # 260, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-050 2330 UNIVERSITY AVE # 140, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-280 2330 UNIVERSITY AVE # 370, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-060 2330 UNIVERSITY AVE # 150, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-300 2330 UNIVERSITY AVE # 390, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-270 2330 UNIVERSITY AVE # 360, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-110 2330 UNIVERSITY AVE # 200, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-090 2330 UNIVERSITY AVE # 180, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-080 2330 UNIVERSITY AVE # 170, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-100 2330 UNIVERSITY AVE # 190, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-290 2330 UNIVERSITY AVE # 380, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-160 2330 UNIVERSITY AVE # 250, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-230 2330 UNIVERSITY AVE # 320, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-190 2330 UNIVERSITY AVE # 280, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-150 2330 UNIVERSITY AVE # 240, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-040 2330 UNIVERSITY AVE # 130, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-180 2330 UNIVERSITY AVE # 270, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-220 2330 UNIVERSITY AVE # 310, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-240 2330 UNIVERSITY AVE # 330, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-250 2330 UNIVERSITY AVE # 340, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-120 2330 UNIVERSITY AVE # 210, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-210 2330 UNIVERSITY AVE # 300, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-030 2330 UNIVERSITY AVE # 120, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-140 2330 UNIVERSITY AVE # 230, EAST PALO ALTO High Density Residential Mixed Use Corridor 114-240-130 2330 UNIVERSITY AVE # 220, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-210-610 661 RUNNYMEDE ST, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-210-470 633 RUNNYMEDE ST, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-210-360 2300 UNIVERSITY AVE, EAST PALO ALTO High Density Residential Mixed Use Corridor 063-302-340 584 RUNNYMEDE ST, EAST PALO ALTO Office Mixed Use Corridor 063-302-170 2283 UNIVERSITY AVE, EAST PALO ALTO Office Mixed Use Corridor 063-302-180 2281 UNIVERSITY AVE, EAST PALO ALTO Office Mixed Use Corridor 063-302-470 2279 UNIVERSITY AVE, EAST PALO ALTO Office Mixed Use Corridor 063-302-460 2277 UNIVERSITY AVE, EAST PALO ALTO Office Mixed Use Corridor 063-302-210 2263 UNIVERSITY AVE, EAST PALO ALTO Office Mixed Use Corridor 063-302-220 2253 UNIVERSITY AVE, EAST PALO ALTO Office Mixed Use Corridor 063-302-230 2247 UNIVERSITY AVE, EAST PALO ALTO Office Mixed Use Corridor 063-302-330 2201 UNIVERSITY AVE, EAST PALO ALTO Office Mixed Use Corridor 063-302-280 575A BELL ST, EAST PALO ALTO Office Mixed Use Corridor 063-302-290 565 BELL ST, EAST PALO ALTO Office Mixed Use Corridor 063-331-420 RUNNYMEDE ST, EAST PALO ALTO Commercial Public/Institutional 063-331-150 2284 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-140 2280 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-130 2276 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-120 2274 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-110 2272 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-100 2268 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-090 2264 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-080 2252 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-070 2248 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 3 of 9 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 250
Appendix C: Table 1
Land Use Changes - 2014 Zoning versus Proposed 2035 Zoning APN Address 2014 Zoning (2) 2035 Zoning (3)
063-331-060 2242 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-380 2240 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-410 2220 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-030 2212 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-370 2200 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-190 2291 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-200 2287 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-210 2285 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-220 2277 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-230 2267 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-240 2263 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-250 2255 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-260 2251 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-270 2249 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-280 2245 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-290 2239 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-300 2233 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-310 2227 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-320 2219 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-330 2217 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-340 2205 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-331-350 643 BELL ST, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-180 612 BELL ST, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-190 616 BELL ST, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-200 644 BELL ST, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-210 2189 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-220 2187 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-230 2181 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-240 2171 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-250 2165 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-260 2161 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-270 2157 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-280 2153 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-290 2149 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-300 2145 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-310 2141 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-320 2133 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-330 2129 CAPITOL AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-400 2194 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-140 2178 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-130 2172 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-120 2166 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-110 2164 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-100 2160 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-410 2148 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-080 2142 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-070 Commercial Mixed Use Corridor
063-321-060 2126 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-050 2124 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-321-420 Commercial Office
063-322-150 2198 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-160 660 BELL ST, EAST PALO ALTO Commercial Medium Density Residential 063-322-140 2194 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-130 2184 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-340 2169 COOLEY AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-110 2162 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-500 2159 COOLEY AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-100 2154 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-090 2144 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-080 2142 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 4 of 9 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 251
Appendix C: Table 1
Land Use Changes - 2014 Zoning versus Proposed 2035 Zoning APN Address 2014 Zoning (2) 2035 Zoning (3)
063-322-070 2138 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-060 2134 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-050 2132 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-040 2124 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-580 2118 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 063-322-560 DONOHOE ST, EAST PALO ALTO High Density Residential Office 063-322-410 High Density Residential Office
063-292-380 2160 EUCLID AVE, EAST PALO ALTO Low Density Residential Mixed Use High 063-292-370 2117 UNIVERSITY AVE, EAST PALO ALTO Office, High Density Residential Mixed Use High 063-292-180 2101 UNIVERSITY AVE, EAST PALO ALTO Commercial Mixed Use High 063-291-010 1489 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Low 063-184-010 1475 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Low 063-184-020 2056 GLEN WAY, EAST PALO ALTO Low Density Residential Mixed Use Low 063-184-030 2070 GLEN WAY, EAST PALO ALTO Low Density Residential Mixed Use Low 063-184-040 2080 GLEN WAY, EAST PALO ALTO Low Density Residential Mixed Use Low 063-183-080 1435 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Low 063-183-070 2045 GLEN WAY, EAST PALO ALTO Commercial Mixed Use Low 063-183-090 Commercial Mixed Use Low
063-183-110 1401 E BAYSHORE RD 2, EAST PALO ALTO Commercial Mixed Use Low 063-183-010 2088 LINCOLN ST, EAST PALO ALTO Commercial Mixed Use Low 063-181-240 1385 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Low 063-181-010 2110 DUMBARTON AVE, EAST PALO ALTO Commercial Mixed Use Low 063-181-230 2097 LINCOLN ST, EAST PALO ALTO Low Density Residential Mixed Use Low 063-181-220 2111 LINCOLN ST, EAST PALO ALTO Low Density Residential Mixed Use Low 063-155-190 2109 DUMBARTON AVE, EAST PALO ALTO Commercial Mixed Use Low 063-155-180 2123 DUMBARTON AVE, EAST PALO ALTO Commercial Mixed Use Low 063-155-010 2106 OAKWOOD DR, EAST PALO ALTO Commercial Mixed Use Low 063-154-260 2119 OAKWOOD DR, EAST PALO ALTO Commercial Mixed Use Low 063-154-200 2110 ADDISON AVE, EAST PALO ALTO Commercial Mixed Use Low 063-153-250 2119 ADDISON AVE, EAST PALO ALTO Commercial Mixed Use Low 063-153-010 1205 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Low 063-152-230 1199 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Low 063-151-170 2159 POPLAR AVE, EAST PALO ALTO Commercial Mixed Use Low 063-151-200 1001 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Low 063-154-240 Parks/Recreation/Conservation Public/Institutional 063-271-480 Parks/Recreation/Conservation Industrial Buffer 063-271-370 1171 RUNNYMEDE ST, EAST PALO ALTO Low Density Residential High Density Residential 063-272-080 1286 RUNNYMEDE ST, EAST PALO ALTO Low Density Residential Public/Institutional 063-381-190 Low Density Residential Public/Institutional 063-341-130 1063 GARDEN ST, EAST PALO ALTO Low Density Residential Public/Institutional 063-341-150 1039 GARDEN ST, EAST PALO ALTO Low Density Residential Public/Institutional 063-600-060 1266 BEECH ST, EAST PALO ALTO Low Density Residential Parks/Recreation/Conservation 063-352-170 980 MYRTLE ST, EAST PALO ALTO Low Density Residential Public/Institutional 063-352-480 1050 MYRTLE ST, EAST PALO ALTO Low Density Residential Public/Institutional 063-491-040 2033A PULGAS AVE, EAST PALO ALTO Low Density Residential Public/Institutional 063-491-030 951 OCONNOR ST, EAST PALO ALTO Low Density Residential Public/Institutional 063-511-240 896 DONOHOE ST, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-260 890 DONOHOE ST, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-020 2039 CLARKE AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-030 2035 CLARKE AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-040 2029 CLARKE AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-050 2027 CLARKE AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-060 2023 CLARKE AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-070 2017 CLARKE AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-080 2013 CLARKE AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-090 2009 CLARKE AVE, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-660 899 OCONNOR ST, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-220 862 DONOHOE ST, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-250 860 DONOHOE ST, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-210 864 DONOHOE ST, EAST PALO ALTO Commercial Mixed Use Corridor 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 5 of 9 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 252
Appendix C: Table 1
Land Use Changes - 2014 Zoning versus Proposed 2035 Zoning APN Address 2014 Zoning (2) 2035 Zoning (3)
063-511-200 866 DONOHOE ST, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-190 872 DONOHOE ST, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-020 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-090 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-030 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-170 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-060 1765 EAST BAYSHORE RD 206, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-100 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-270 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-260 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-140 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-450-060
1765 EAST BAYSHORE RD A1&A2,
EAST PALO ALTO Commercial Mixed Use Corridor
114-460-210 1765 EAST BAYSHORE RD 221, EAST PALO ALTO Commercial Mixed Use Corridor 114-450-020 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-040 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-450-040 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-200 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-450-010 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-050 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-180 1765 EAST BAYSHORE RD 218, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-250 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-110 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-150 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-450-050 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-160 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-280 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-120 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-450-030 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-010 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-220 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-240 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-290 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-070 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-130 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-300 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-190 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-230 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 114-460-080 1765 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 063-511-520 1761 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use High 063-511-680 1751 EAST BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use High 063-511-690 1745 E BAYSHORE BLVD, EAST PALO ALTO Commercial Mixed Use High 063-511-490 1731 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use High 063-511-630 1721 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use High 063-511-720 1775 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use High 063-312-400 Commercial Office
063-665-020 1960-1962 TATE ST, EAST PALO ALTO Medium Density Residential Parks/Recreation/Conservation 063-676-020 1960-1962 TATE ST, EAST PALO ALTO Medium Density Residential Parks/Recreation/Conservation 134-241-370 High Density Residential Low Density Residential 134-241-090 1885 E BAYSHORE RD SPC 9, EAST PALO ALTO High Density Residential Low Density Residential 134-241-100 1885 E BAYSHORE RD SPC 10, EAST PALO ALTO High Density Residential Low Density Residential 134-241-360 High Density Residential Low Density Residential 134-241-120 High Density Residential Low Density Residential 134-241-891 1885 E BAYSHORE RD, EAST PALO ALTO High Density Residential Low Density Residential 134-241-400 1885 E BAYSHORE RD SPC 40, EAST PALO ALTO High Density Residential Low Density Residential 134-241-750 1885 E BAYSHORE RD SPC 75, EAST PALO ALTO High Density Residential Low Density Residential 134-241-680 High Density Residential Low Density Residential 134-241-080 High Density Residential Low Density Residential 134-241-650 High Density Residential Low Density Residential 134-241-791 1885 E BAYSHORE RD SPC 79, EAST PALO ALTO High Density Residential Low Density Residential 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 6 of 9 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 253
Appendix C: Table 1
Land Use Changes - 2014 Zoning versus Proposed 2035 Zoning APN Address 2014 Zoning (2) 2035 Zoning (3)
134-241-630 1885 E BAYSHORE RD, EAST PALO ALTO High Density Residential Low Density Residential 134-241-140 1885 E BAYSHORE RD #14, EAST PALO ALTO High Density Residential Low Density Residential 134-241-520 High Density Residential Low Density Residential 134-241-720 1885 E BAYSHORE RD SPC 72, EAST PALO ALTO High Density Residential Low Density Residential 134-241-240 1885 E BAYSHORE RD SPC 24, EAST PALO ALTO High Density Residential Low Density Residential 134-241-340 High Density Residential Low Density Residential 134-241-380 High Density Residential Low Density Residential 134-241-810 High Density Residential Low Density Residential 134-241-261 1885 E BAYSHORE RD SPC 26, EAST PALO ALTO High Density Residential Low Density Residential 134-242-180 High Density Residential Low Density Residential 134-241-980 1885 E BAYSHORE RD SPC 98, EAST PALO ALTO High Density Residential Low Density Residential 134-241-221 1885 E BAYSHORE RD SPC 22, EAST PALO ALTO High Density Residential Low Density Residential 134-241-960 1885 E BAYSHORE RD #96, EAST PALO ALTO High Density Residential Low Density Residential 134-241-580 1885 E BAYSHORE RD SPC 58, EAST PALO ALTO High Density Residential Low Density Residential 134-241-870 High Density Residential Low Density Residential 134-241-350 1885 E BAYSHORE RD, EAST PALO ALTO High Density Residential Low Density Residential 134-241-991 High Density Residential Low Density Residential 134-241-780 1885 E BAYSHORE RD SPC 78, EAST PALO ALTO High Density Residential Low Density Residential 134-241-550 1885 E BAYSHORE BLVD #55, EAST PALO ALTO High Density Residential Low Density Residential 134-241-200 1885 E BAYSHORE RD SPC 20, EAST PALO ALTO High Density Residential Low Density Residential 134-241-770 1885 E BAYSHORE RD SPC 77, EAST PALO ALTO High Density Residential Low Density Residential 134-242-070 High Density Residential Low Density Residential 134-241-660 1885 E BAYSHORE RD SPC 66, EAST PALO ALTO High Density Residential Low Density Residential 134-241-150 High Density Residential Low Density Residential 134-242-131 1885 E BAYSHORE RD SPC 112, EAST PALO ALTO High Density Residential Low Density Residential 134-242-110 High Density Residential Low Density Residential 134-241-530 1885 E BAYSHORE RD SPC 53, EAST PALO ALTO High Density Residential Low Density Residential 134-241-070 High Density Residential Low Density Residential 134-241-640 1885 E BAYSHORE RD SPC 64, EAST PALO ALTO High Density Residential Low Density Residential 134-241-590 1885 E BAYSHORE RD #59, EAST PALO ALTO High Density Residential Low Density Residential 134-241-160 1885 E BAYSHORE RD #16, EAST PALO ALTO High Density Residential Low Density Residential 134-241-790 High Density Residential Low Density Residential 134-241-560 1885 E BAYSHORE RD SPC 56, EAST PALO ALTO High Density Residential Low Density Residential 134-241-060 High Density Residential Low Density Residential 134-241-921 1885 E BAYSHORE RD SPC 92, EAST PALO ALTO High Density Residential Low Density Residential 134-241-390 High Density Residential Low Density Residential 134-241-010 1885 E BAYSHORE RD SPC 1, EAST PALO ALTO High Density Residential Low Density Residential 134-242-140 High Density Residential Low Density Residential 134-241-330 1885 E BAYSHORE RD SPC 33, EAST PALO ALTO High Density Residential Low Density Residential 134-241-300 High Density Residential Low Density Residential 134-241-850 High Density Residential Low Density Residential 134-241-670 1885 E BAYSHORE RD SPC 67, EAST PALO ALTO High Density Residential Low Density Residential 134-242-050 High Density Residential Low Density Residential 134-241-800 High Density Residential Low Density Residential 134-241-510 1885 E BAYSHORE RD SPC 51, EAST PALO ALTO High Density Residential Low Density Residential 134-241-311 1855 E BAYSHORE RD #31, EAST PALO ALTO High Density Residential Low Density Residential 134-241-050 1885 E BAYSHORE RD SPC 5, EAST PALO ALTO High Density Residential Low Density Residential 134-241-831 1885 E BAYSHORE RD SPC 83, EAST PALO ALTO High Density Residential Low Density Residential 134-241-110 1885 E BAYSHORE RD SPC 11, EAST PALO ALTO High Density Residential Low Density Residential 134-241-950 1885 E BAYSHORE RD SPC 95, EAST PALO ALTO High Density Residential Low Density Residential 134-241-860 High Density Residential Low Density Residential 134-241-700 1885 E BAYSHORE RD #70, EAST PALO ALTO High Density Residential Low Density Residential 134-241-930 1885 E BAYSHORE RD SPC 93, EAST PALO ALTO High Density Residential Low Density Residential 134-241-821 1885 E BAYSHORE RD SPC 82, EAST PALO ALTO High Density Residential Low Density Residential 134-242-040 1885 E BAYSHORE RD #103, EAST PALO ALTO High Density Residential Low Density Residential 134-241-681 High Density Residential Low Density Residential 134-241-290 1885 E BAYSHORE RD SPC 29, EAST PALO ALTO High Density Residential Low Density Residential 134-241-470 1885 E BAYSHORE RD SPC 47, EAST PALO ALTO High Density Residential Low Density Residential 134-241-690 1885 E BAYSHORE RD SPC 69, EAST PALO ALTO High Density Residential Low Density Residential 134-241-410 High Density Residential Low Density Residential 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 7 of 9 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 254
Appendix C: Table 1
Land Use Changes - 2014 Zoning versus Proposed 2035 Zoning APN Address 2014 Zoning (2) 2035 Zoning (3)
134-241-900 1885 E BAYSHORE RD SPC 90, EAST PALO ALTO High Density Residential Low Density Residential 134-241-420 1885 E BAYSHORE RD SPC 42, EAST PALO ALTO High Density Residential Low Density Residential 134-241-910 1885 E BAYSHORE RD SPC 91, EAST PALO ALTO High Density Residential Low Density Residential 134-241-190 1885 E BAYSHORE RD SPC 19, EAST PALO ALTO High Density Residential Low Density Residential 134-241-230 High Density Residential Low Density Residential 134-241-270 1885 E BAYSHORE RD SPC 27, EAST PALO ALTO High Density Residential Low Density Residential 134-241-210 High Density Residential Low Density Residential 134-242-150 High Density Residential Low Density Residential 134-241-490 1885 E BAYSHORE RD SPC 49, EAST PALO ALTO High Density Residential Low Density Residential 134-241-801 1885 E BAYSHORE RD #80, EAST PALO ALTO High Density Residential Low Density Residential 134-241-280 1885 E BAYSHORE RD SPC 28, EAST PALO ALTO High Density Residential Low Density Residential 134-242-060 1885 E BAYSHORE RD SPC 105, EAST PALO ALTO High Density Residential Low Density Residential 134-241-880 High Density Residential Low Density Residential 134-241-180 High Density Residential Low Density Residential 134-242-100 High Density Residential Low Density Residential 134-241-761 High Density Residential Low Density Residential 063-492-270 1885 E BAYSHORE RD, EAST PALO ALTO High Density Residential Low Density Residential 134-241-310 High Density Residential Low Density Residential 134-241-570 1885 E BAYSHORE RD SPC 57, EAST PALO ALTO High Density Residential Low Density Residential 134-241-020 1885 E BAYSHORE RD SPC 2, EAST PALO ALTO High Density Residential Low Density Residential 063-492-280 1933 PULGAS AVE, EAST PALO ALTO Commercial Medium Density Residential 063-492-070 1927 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 063-492-480 1895 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 063-571-090 1905 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 063-571-080 1961 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 063-571-060 1985 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 063-571-070 1981 E BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Corridor 063-501-020 1874 W BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Low 063-501-030 1870 W BAYSHORE RD, EAST PALO ALTO Commercial Mixed Use Low 063-501-040 1879 WOODLAND AVE, EAST PALO ALTO Commercial Mixed Use Low 063-501-050 1875 WOODLAND AVE, EAST PALO ALTO Commercial Mixed Use Low 063-515-060 1821 CLARKE AVE, EAST PALO ALTO High Density Residential Low Density Residential 063-515-070 1805 CLARKE AVE, EAST PALO ALTO High Density Residential Low Density Residential 063-515-080 1787 WOODLAND AVE, EAST PALO ALTO High Density Residential Low Density Residential 063-515-230 1785 WOODLAND AVE, EAST PALO ALTO High Density Residential Low Density Residential 063-484-130 1957 COOLEY AVE, EAST PALO ALTO Commercial High Density Residential 063-484-090 1949 COOLEY AVE, EAST PALO ALTO Commercial High Density Residential 063-484-100 1941 COOLEY AVE, EAST PALO ALTO Commercial High Density Residential 063-484-110 685 SCOFIELD AVE, EAST PALO ALTO Commercial High Density Residential 063-484-060 1934 CAPITOL AVE, EAST PALO ALTO Commercial High Density Residential 063-484-050 1920 CAPITOL AVE, EAST PALO ALTO Commercial High Density Residential 063-484-040 1916 CAPITOL AVE, EAST PALO ALTO Commercial High Density Residential 063-484-030 1908 CAPITOL AVE, EAST PALO ALTO Commercial High Density Residential 063-484-020 1902 CAPITOL AVE, EAST PALO ALTO Commercial High Density Residential 063-484-010 655 SCOFIELD AVE, EAST PALO ALTO Commercial High Density Residential 063-483-040 1943 CAPITOL AVE, EAST PALO ALTO Commercial High Density Residential 063-483-050 1609 WOODLAND AVE, EAST PALO ALTO Commercial High Density Residential 063-483-030 1909 CAPITOL AVE, EAST PALO ALTO Commercial Medium Density Residential 063-482-030 611 CIRCLE DR, EAST PALO ALTO Commercial Medium Density Residential 063-482-020 621 CIRCLE DR, EAST PALO ALTO Commercial Medium Density Residential 063-482-010 641 CIRCLE DR, EAST PALO ALTO Commercial Medium Density Residential 063-481-120 660 SCOFIELD AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-130 610 CIRCLE DR, EAST PALO ALTO Commercial Medium Density Residential 063-481-140 620 CIRCLE DR, EAST PALO ALTO Commercial Medium Density Residential 063-481-150 630 CIRCLE DR, EAST PALO ALTO Commercial Medium Density Residential 063-481-160 640 CIRCLE DR, EAST PALO ALTO Commercial Medium Density Residential 063-481-170 650 CIRCLE DR, EAST PALO ALTO Commercial Medium Density Residential 063-481-110 652 SCOFIELD AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-100 644 SCOFIELD AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-090 1621 WOODLAND AVE, EAST PALO ALTO Commercial Medium Density Residential 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 8 of 9 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 255
Appendix C: Table 1
Land Use Changes - 2014 Zoning versus Proposed 2035 Zoning APN Address 2014 Zoning (2) 2035 Zoning (3)
063-481-080 1629 WOODLAND AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-070 1637 WOODLAND AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-060 1643 WOODLAND AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-050 1651 WOODLAND AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-040 1669 WOODLAND AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-030 1671 WOODLAND AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-020 1681 WOODLAND AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-010 1699 WOODLAND AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-210 1901 COOLEY AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-220 1905 COOLEY AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-190 1909 COOLEY AVE, EAST PALO ALTO Commercial Medium Density Residential 063-481-180 1917 COOLEY AVE, EAST PALO ALTO Commercial Medium Density Residential 063-680-050 Commercial Office
063-680-150 2050 UNIVERSITY AVE, EAST PALO ALTO Commercial Office 063-680-130 2000 UNIVERSITY AVE, EAST PALO ALTO Commercial Office 063-680-020 1900 UNIVERSITY AVE, EAST PALO ALTO Commercial Office 063-680-100 Commercial Office
063-680-110 Commercial Office
063-680-190 2000 UNIVERSITY AVE, EAST PALO ALTO Commercial Office 063-680-090 Commercial Office
063-680-180 Commercial Office
063-680-060 Commercial Office
063-282-080 2033 MANHATTAN AVE, EAST PALO ALTO Commercial High Density Residential 063-282-090 2001 MANHATTAN AVE, EAST PALO ALTO Commercial High Density Residential 063-473-150 1995 MANHATTAN AVE, EAST PALO ALTO Commercial High Density Residential 063-473-160 1991 MANHATTAN AVE, EAST PALO ALTO Commercial High Density Residential 063-473-170 1965 MANHATTAN AVE, EAST PALO ALTO Commercial High Density Residential 063-473-180 1955 MANHATTAN AVE, EAST PALO ALTO Commercial High Density Residential 063-473-190 1919 MANHATTAN AVE, EAST PALO ALTO Commercial High Density Residential 063-473-200 1901 MANHATTAN AVE, EAST PALO ALTO Commercial High Density Residential 063-442-360 330 DONOHOE ST, EAST PALO ALTO Low Density Residential High Density Residential Notes
(1) Assessor Parcel Number (APNs) for all parcels is provided and street addresses are included when the parcel has an assigned address.

If no address is available, the cell is left blank.
(2) 2014 zoning is the zoning for the parcel at the time of the preparation of the 2015 Master Plan for the East Palo Alto Sanitary District. (3) 2035 Zoning per the City of East Palo Alto's General Plan. 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 9 of 9 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 256
Appendix C: Table 2
2014 Zoning Sanitary Sewer Flows
APN Address Land Use from EDS
Equivalent
Dwelling Units
Average Daily
Flow for
Residential , GPD
(1) (1) (2) (3) (4)
063-103-310 1585 BAY RD, EAST PALO ALTO Restaurant 30 7,240 063-103-360 (5) , EAST PALO ALTO Public 0 0
063-103-370 (5) , EAST PALO ALTO Public 1 240
063-103-380 (5) , EAST PALO ALTO Public 0 0
063-103-390 (5) , EAST PALO ALTO Public 0 0
063-103-440 2400 GLORIA WAY, EAST PALO ALTO Res-Multpl 40 9,600 063-111-230
BETWEEN 1585 AND 1675 BAY RD, EAST PALO
ALTO Public 0 0
063-111-250 1675 BAY RD, EAST PALO ALTO Commercial 1 240 063-121-030 (5) , EAST PALO ALTO No hookup 0 0
063-121-040 (5) , EAST PALO ALTO No hookup 0 0
063-121-050 (5) TARA RD, EAST PALO ALTO No hookup 0 0
063-121-060 (5) 264 TARA RD, EAST PALO ALTO Commercial 0 0 063-121-070 (5) 2081 BAY RD, EAST PALO ALTO Industrial 0 0 063-121-110 (5) 2077 BAY RD, EAST PALO ALTO Industrial 0 0 063-121-120 (5) 2005 BAY RD, EAST PALO ALTO Industrial 0 0 063-121-150 (5) , EAST PALO ALTO No hookup 0 0
063-121-160 (5) 180 TARA ROAD, EAST PALO ALTO No hookup 0 0 063-121-170 (5) 240 TARA ROAD, EAST PALO ALTO No hookup 0 0 063-121-190 (5) 2560 PULGAS AVE, EAST PALO ALTO Industrial 1 240 063-121-200 (5) 2555 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-121-210 (5) 2555 PULGAS AVE, EAST PALO ALTO Commercial 1 240 063-121-290 (5) 218 DEMETER ST, EAST PALO ALTO Commercial 3 744 063-121-320 (5) 350 DEMETER ST, EAST PALO ALTO Commercial 1 240 063-121-330 (5) , EAST PALO ALTO No hookup 0 0
063-121-350 (5) , EAST PALO ALTO No hookup 0 0
063-121-360 (5) , EAST PALO ALTO No hookup 0 0
063-121-370 (5) 2535 PULGAS AVE, EAST PALO ALTO Industrial 1 240 063-121-390 (5) , EAST PALO ALTO Commercial 0 0
063-121-400 2091 BAY RD, EAST PALO ALTO Commercial 1 240 063-121-410 (5) 2091 BAY RD, EAST PALO ALTO Industrial 0 0 063-121-490 (5) , EAST PALO ALTO Industrial 0 0
063-121-500 (5) , EAST PALO ALTO Industrial 1 240
063-121-510 (5) , EAST PALO ALTO Industrial 1 240
063-122-040 (5) 1990 BAY RD, EAST PALO ALTO Res-Single 1 240 063-131-220 (5) 2519 PULGAS AVE, EAST PALO ALTO Civic Facilities 1 240 063-131-230 (5) , EAST PALO ALTO No hookup 0 0
063-131-240 (5) 1885 BAY RD, EAST PALO ALTO Civic Facilities 1 240 063-131-250 (5) 1861 BAY RD, EAST PALO ALTO Commercial 0 0 063-131-260 (5) 1879 BAY RD, EAST PALO ALTO Commercial 1 240 063-131-270 (5) 1873 BAY RD, EAST PALO ALTO No hookup 0 0 063-131-290 (5) 140 DEMETER ST, EAST PALO ALTO Commercial 1 240 063-131-300 (5) , EAST PALO ALTO Commercial 1 240
063-131-310 (5) 1891 BAY RD, EAST PALO ALTO Civic Facilities 1 240 063-131-320 (5) 1847 BAY RD, EAST PALO ALTO Commercial 1 240 063-131-330 (5) 1851 BAY RD, EAST PALO ALTO Commercial 0 0 063-131-340 (5) 2509 PULGAS AVE, EAST PALO ALTO Commercial 1 240 063-132-020 (5) 151 TARA RD, EAST PALO ALTO Commercial 1 240 063-132-060 (5) 150 TARA RD, EAST PALO ALTO Commercial 1 240 063-132-090 (5) , EAST PALO ALTO No hookup 0 0
063-132-110 (5) 1923 BAY RD, EAST PALO ALTO Commercial 0 0 063-132-120 (5) 1907 BAY RD, EAST PALO ALTO Commercial 1 240 063-132-130 (5) 1911 BAY RD, EAST PALO ALTO Commercial 1 240 063-132-140 1905 BAY RD, EAST PALO ALTO Industrial 1 240 063-132-150 (5) 2520 PULGAS AVE, EAST PALO ALTO Industrial 1 240 063-132-170 (5) , EAST PALO ALTO Industrial 1 240
063-132-190 (5) 2532 PULGAS AVE, EAST PALO ALTO Industrial 2 480 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 1 of 10 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 257
Appendix C: Table 2
2014 Zoning Sanitary Sewer Flows
APN Address Land Use from EDS
Equivalent
Dwelling Units
Average Daily
Flow for
Residential , GPD
(1) (1) (2) (3) (4)
063-132-210 (5) 2524 PULGAS AVE, EAST PALO ALTO Industrial 1 240 063-132-220 (5) 1987 BAY RD, EAST PALO ALTO No hookup 0 0 063-133-110 (5) , EAST PALO ALTO Industrial 1 240
063-133-130 (5) 1805 BAY RD, EAST PALO ALTO Commercial 7 1,620 063-151-170 2159 POPLAR AVE, EAST PALO ALTO Res-Multpl 2 480 063-151-200 1001 E BAYSHORE RD, EAST PALO ALTO Res-Single 1 240 063-152-230 1199 E BAYSHORE RD, EAST PALO ALTO Church 1 240 063-153-010 1205 E BAYSHORE RD, EAST PALO ALTO No hookup 0 0 063-153-250 2119 ADDISON AVE, EAST PALO ALTO Manual 0 0 063-154-200 2110 ADDISON AVE, EAST PALO ALTO Commercial 1 240 063-154-260 2119 OAKWOOD DR, EAST PALO ALTO Res-Multpl 1 240 063-155-010 2106 OAKWOOD DR, EAST PALO ALTO Commercial 1 240 063-155-180 2123 DUMBARTON AVE, EAST PALO ALTO Res-Single 1 240 063-155-190 2109 DUMBARTON AVE, EAST PALO ALTO Res-Multpl 1 240 063-181-010 2110 DUMBARTON AVE, EAST PALO ALTO Res-Multpl 1 240 063-181-220 2111 LINCOLN ST, EAST PALO ALTO Res-Single 1 240 063-181-230 2097 LINCOLN ST, EAST PALO ALTO Res-Single 1 240 063-181-240 1385 E BAYSHORE RD, EAST PALO ALTO No hookup 0 0 063-183-010 2088 LINCOLN ST, EAST PALO ALTO Res-Multpl 1 240 063-183-070 2045 GLEN WAY, EAST PALO ALTO Res-Multpl 1 240 063-183-080 1441 E BAYSHORE RD, EAST PALO ALTO Commercial 1 240 063-183-090 , EAST PALO ALTO No hookup 0 0
063-183-110 1401 E BAYSHORE RD 2, EAST PALO ALTO Res-Multpl 0 0 063-184-010 1475 E BAYSHORE RD, EAST PALO ALTO Commercial 0 0 063-184-020 2056 GLEN WAY, EAST PALO ALTO Res-Multpl 0 0 063-184-030 2070 GLEN WAY, EAST PALO ALTO Res-Multpl 0 0 063-184-040 2080 GLEN WAY, EAST PALO ALTO Manual 0 0
063-201-080 566 SACRAMENTO ST, EAST PALO ALTO Res-Multpl 1 240 063-201-090 576 SACRAMENTO ST, EAST PALO ALTO Res-Single 1 240 063-201-220 2337 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-201-240 2343 UNIVERSITY AVE, EAST PALO ALTO Res-Multpl 1 240 063-201-250 RUNNYMEDE ST, EAST PALO ALTO Res-Multpl 1 240 063-201-260 RUNNYMEDE ST, EAST PALO ALTO Res-Single 1 240 063-201-270 578 SACRAMENTO ST, EAST PALO ALTO Res-Multpl 1 240 063-201-290 2331 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-202-080 556 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-202-090 564 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-202-100 566 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-202-160 561 SACRAMENTO ST, EAST PALO ALTO Res-Multpl 1 240 063-202-280
2361-2369 UNIVERSITY AVE 101-308,
EAST PALO ALTO Res-Multpl 1 240
063-203-160 (5) 2387 UNIVERSITY AVE, EAST PALO ALTO Commercial 2 461 063-203-170 (5) 2381 UNIVERSITY AVE, EAST PALO ALTO Commercial 2 408 063-203-180 (5) 2373 UNIVERSITY AVE, EAST PALO ALTO Commercial 1 240 063-203-200 (5) 593 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-203-210 585 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-203-220 579 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-203-230 563 WEEKS ST, EAST PALO ALTO Res-Multpl 1 240 063-203-240 549 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-203-250 541 WEEKS ST, EAST PALO ALTO Res-Multpl 1 240 063-203-260 533 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-203-270 , EAST PALO ALTO No hookup 0 0
063-203-300 (5) 2395 UNIVERSITY AVE, EAST PALO ALTO Restaurant 4 922 063-203-310 (5) 2371 UNIVERSITY AVE, EAST PALO ALTO Commercial 1 240 063-203-320 (5) 1586 BAY RD, EAST PALO ALTO Res-Single 1 240 063-203-330 (5) 1590 BAY RD, EAST PALO ALTO No hookup 0 0 063-203-340 (5) 2387 UNIVERSITY AVE, EAST PALO ALTO Commercial 1 240 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 2 of 10 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 258
Appendix C: Table 2
2014 Zoning Sanitary Sewer Flows
APN Address Land Use from EDS
Equivalent
Dwelling Units
Average Daily
Flow for
Residential , GPD
(1) (1) (2) (3) (4)
063-203-350 1574 BAY RD, EAST PALO ALTO Res-Single 1 240 063-203-360 1546 BAY RD, EAST PALO ALTO Res-Single 1 240 063-203-370 1508 BAY RD, EAST PALO ALTO Res-Single 1 240 063-203-380 , NO DATA No hookup 0 0
063-203-390 1518 BAY RD, EAST PALO ALTO Res-Single 1 240 063-203-400 1560 BAY RD, EAST PALO ALTO Res-Single 1 240 063-203-410 1568 BAY RD, EAST PALO ALTO Res-Single 1 240 063-203-430 1530 BAY RD, EAST PALO ALTO Res-Single 1 240 063-203-440 1554 BAY RD, EAST PALO ALTO Res-Single 1 240 063-203-450 1538 BAY RD, EAST PALO ALTO Res-Single 1 240 063-210-310 2346 UNIVERSITY AVE, EAST PALO ALTO Res-Multpl 1 240 063-210-340 2369 COOLEY AVE, EAST PALO ALTO Res-Single 1 240 063-210-350 2365 COOLEY AVE, EAST PALO ALTO Res-Single 1 240 063-210-360 2300 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-210-380 2354 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-210-410 2371 COOLEY AVE, EAST PALO ALTO Res-Single 1 240 063-210-450 2377 COOLEY AVE, EAST PALO ALTO Res-Single 1 240 063-210-460 (5) 2396 UNIVERSITY AVE, EAST PALO ALTO Commercial 1 240 063-210-470 633 RUNNYMEDE ST, EAST PALO ALTO Res-Single 1 240 063-210-480 2361 COOLEY AVE, EAST PALO ALTO Res-Single 1 240 063-210-490 2355 COOLEY AVE, EAST PALO ALTO Res-Multpl 1 240 063-210-520 2338 UNIVERSITY AVE, EAST PALO ALTO Res-Multpl 1 240 063-210-610 661 RUNNYMEDE ST, EAST PALO ALTO Res-Single 1 240 063-210-630 2358 UNIVERSITY AVE, EAST PALO ALTO Res-Multpl 1 240 063-221-010 (5) , EAST PALO ALTO Manual 0 0
063-221-020 (5) 1620 BAY RD, EAST PALO ALTO Res-Single 1 240 063-221-030 (5) , EAST PALO ALTO Res-Single 1 240
063-221-040 (5) 1640 BAY RD, EAST PALO ALTO Res-Multpl 12 2,880 063-221-050 (5) 1650 BAY RD, EAST PALO ALTO Res-Multpl 5 1,200 063-221-060 (5) 1660 BAY RD, EAST PALO ALTO Res-Multpl 21 5,040 063-221-070 (5) 1670 BAY RD, EAST PALO ALTO Res-Multpl 17 4,080 063-221-100 (5) 1760 BAY RD, EAST PALO ALTO Res-Multpl 48 11,520 063-221-110 (5) 1796 BAY RD, EAST PALO ALTO Commercial 1 240 063-221-140 (5) 2397 CLARKE AVE, EAST PALO ALTO Res-Multpl 5 1,200 063-221-150 (5) 2387 CLARKE AVE, EAST PALO ALTO Res-Multpl 5 1,200 063-221-160 (5) 2377 CLARKE AVE, EAST PALO ALTO Res-Multpl 5 1,200 063-221-170 (5) 2373 CLARKE AVE, EAST PALO ALTO Res-Multpl 2 480 063-221-180 2371 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-221-190 2369 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-221-200 891 WEEKS ST, EAST PALO ALTO Church 1 240
063-221-210 871 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-221-220 867 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-221-230 865 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-221-240 , NO DATA No hookup 0 0
063-221-250 831 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-221-260 819 JAMIE LN, EAST PALO ALTO No hookup 0 0
063-221-270 823 JAMIE LN, EAST PALO ALTO No hookup 0 0
063-221-280 827 JAMIE LN, EAST PALO ALTO No hookup 0 0
063-221-290 811 PAUL ROBESON CT, EAST PALO ALTO Res-Single 1 240 063-221-300 813 PAUL ROBESON CT, EAST PALO ALTO Res-Single 1 240 063-221-310 815 PAUL ROBESON CT, EAST PALO ALTO Res-Single 1 240 063-221-320 817 PAUL ROBESON CT, EAST PALO ALTO Res-Single 1 240 063-221-340 801 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-221-350 803 PAUL ROBESON CT, EAST PALO ALTO Res-Single 1 240 063-221-360 805 PAUL ROBESON CT, EAST PALO ALTO Res-Single 1 240 063-221-370 807 PAUL ROBESON CT, EAST PALO ALTO Res-Single 1 240 063-221-380 809 PAUL ROBESON CT, EAST PALO ALTO Res-Single 1 240 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 3 of 10 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 259
Appendix C: Table 2
2014 Zoning Sanitary Sewer Flows
APN Address Land Use from EDS
Equivalent
Dwelling Units
Average Daily
Flow for
Residential , GPD
(1) (1) (2) (3) (4)
063-221-390 791 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-221-410 731 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-221-420 717 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-221-430 2360 COOLEY AVE, EAST PALO ALTO Res-Single 1 240 063-221-440 2362-2362 COOLEY AVE, EAST PALO ALTO Res-Multpl 1 240 063-221-450 2364 COOLEY AVE, EAST PALO ALTO Res-Single 1 240 063-221-460 (5) 2370 COOLEY AVE, EAST PALO ALTO Res-Multpl 42 10,080 063-221-480 (5) 2380 COOLEY AVE, EAST PALO ALTO Commercial 16 3,758 063-221-490 (5) , EAST PALO ALTO No hookup 0 0
063-221-500 863 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-221-510 761 WEEKS ST, EAST PALO ALTO Res-Single 1 240 063-221-520 767 CAROLE CT, EAST PALO ALTO Res-Single 1 240 063-221-530 773 CAROLE CT, EAST PALO ALTO Res-Single 1 240 063-221-540 779 CAROLE CT, EAST PALO ALTO Res-Single 1 240 063-221-550 785 CAROLE CT, EAST PALO ALTO Res-Single 1 240 063-221-560 (5) 1794 BAY RD, EAST PALO ALTO Church 1 240 063-221-570 (5) , EAST PALO ALTO No hookup 0 0
063-221-580 (5) , EAST PALO ALTO No hookup 0 0
063-221-590 (5) 1730 BAY RD, EAST PALO ALTO Res-Multpl 77 18,480 063-231-210 (5) 2495 PULGAS AVE, EAST PALO ALTO Commercial 3 629 063-231-220 1800 BAY RD, EAST PALO ALTO Commercial 1 240 063-231-230 (5) 1890 BAY RD, EAST PALO ALTO Res-Multpl 2 480 063-231-240 1804 BAY RD, EAST PALO ALTO Commercial 1 240 063-231-250 1798 BAY RD, EAST PALO ALTO Medical 1 240
063-231-260 (5) 1836 BAY RD, EAST PALO ALTO Commercial 1 240 063-231-270 (5) 1894 BAY RD, EAST PALO ALTO Res-Single 1 240 063-231-280 (5) 1896 BAY RD, EAST PALO ALTO Res-Single 1 240 063-231-300 (5) , EAST PALO ALTO No hookup 0 0
063-232-090 1003 WEEKS ST, EAST PALO ALTO Commercial 11 2,743 063-232-150 2421 PULGAS AVE, EAST PALO ALTO Restaurant 6 1,545 063-232-160 2447 PULGAS AVE, EAST PALO ALTO Commercial 1 302 063-232-200 (5) 2373 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-232-210 WEEKS ST, EAST PALO ALTO No hookup 0 0
063-232-220 WEEKS ST, EAST PALO ALTO Commercial 0 0
063-232-230 WEEKS ST, EAST PALO ALTO No hookup 0 0
063-232-240 1045 WEEKS ST, EAST PALO ALTO Commercial 1 240 063-232-250 1085 WEEKS ST, EAST PALO ALTO Manual 0 0
063-232-260 1001 WEEKS ST, EAST PALO ALTO Church 1 240
063-232-300 1095 WEEKS ST, EAST PALO ALTO Commercial 1 336 063-232-310 (5) 2368 CLARKE AVE, EAST PALO ALTO Commercial 1 240 063-232-340 (5) 2386 CLARKE AVE, EAST PALO ALTO Commercial 1 240 063-232-350 901 WEEKS ST, EAST PALO ALTO Public 0 0
063-240-210 (5) NO DATA, EAST PALO ALTO No hookup 0 0
063-240-220 (5) NO DATA, EAST PALO ALTO No hookup 0 0
063-240-270 (5) NO DATA, EAST PALO ALTO No hookup 0 0
063-240-310 (5) NO DATA, EAST PALO ALTO Industrial 1 240 063-240-350 (5) NO DATA, EAST PALO ALTO No hookup 0 0
063-240-360 (5) NO DATA, EAST PALO ALTO No hookup 0 0
063-240-370 (5) NO DATA, EAST PALO ALTO Res-Single 1 240 063-240-380 (5) NO DATA, EAST PALO ALTO Res-Single 1 240 063-240-390 (5) NO DATA, EAST PALO ALTO Industrial 1 240 063-240-420 (5) NO DATA, EAST PALO ALTO Industrial 1 240 063-240-440 (5) NO DATA, EAST PALO ALTO No hookup 0 0
063-240-460 (5) NO DATA, EAST PALO ALTO Industrial 1 240 063-253-320 (5) ,NO DATA No hookup 0 0
063-271-070 (5) 1275 RUNNYMEDE ST, EAST PALO ALTO Res-Multpl 3 720 063-271-090 (5) 1201 RUNNYMEDE ST, EAST PALO ALTO Res-Multpl 2 480 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 4 of 10 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 260
Appendix C: Table 2
2014 Zoning Sanitary Sewer Flows
APN Address Land Use from EDS
Equivalent
Dwelling Units
Average Daily
Flow for
Residential , GPD
(1) (1) (2) (3) (4)
063-271-370 1171 RUNNYMEDE ST, EAST PALO ALTO Church 1 240 063-271-410 (5) NO DATA, EAST PALO ALTO Res-Single 1 240 063-271-420 (5) NO DATA, EAST PALO ALTO Res-Single 1 240 063-271-440 (5) 1191 RUNNYMEDE ST, EAST PALO ALTO Res-Single 1 240 063-271-450 (5) 1200 WEEKS ST, EAST PALO ALTO No hookup 0 0 063-271-470 (5) 1249 RUNNYMEDE ST, EAST PALO ALTO Res-Single 1 240 063-271-480 , EAST PALO ALTO No hookup 0 0
063-271-490 (5) NO DATA, EAST PALO ALTO No hookup 0 0
063-271-500 (5) 1269 RUNNYMEDE ST, EAST PALO ALTO Res-Single 1 240 063-271-510 (5) 1265 RUNNYMEDE ST, EAST PALO ALTO Res-Single 1 240 063-271-520 (5) 1261 RUNNYMEDE ST, EAST PALO ALTO Res-Single 1 240 063-271-530 (5) 1257 RUNNYMEDE ST, EAST PALO ALTO Res-Single 1 240 063-271-540 (5) NO DATA, EAST PALO ALTO Res-Single 1 240 063-271-550 (5) NO DATA, EAST PALO ALTO Res-Single 1 240 063-271-560 (5) NO DATA, EAST PALO ALTO Res-Single 1 240 063-271-570 (5) NO DATA, EAST PALO ALTO Res-Single 1 240 063-281-020 (5) 2021 EUCLID AVE Res-Multpl 1 240
063-281-030 (5) 2025 EUCLID AVE Res-Multpl 1 240
063-281-040 (5) 2031 EUCLID AVE Res-Multpl 1 240
063-281-100 (5) 2043 EUCLID AVE Commercial 1 240
063-281-110 (5) 2041 EUCLID AVE Commercial 1 240
063-282-010 (5) 501 O'CONNOR STREET Res-Multpl 1 240
063-282-020 (5) 2012 EUCLID AVE Res-Multpl 1 240
063-282-030 (5) 2032 EUCLID AVE Res-Multpl 1 240
063-282-040 (5) 2036 EUCLID AVE Res-Multpl 1 240
063-282-050 (5) 2040/2042 EUCLID AVE Res-Multpl 1 240
063-282-060 (5) 2044 EUCLID AVE Res-Multpl 1 240
063-282-070 (5) 2054 EUCLID AVE Res-Multpl 1 240
063-282-080 2033 MANHATTAN AVE, EAST PALO ALTO Res-Multpl 1 240 063-282-090 2001 MANHATTAN AVE, EAST PALO ALTO Res-Multpl 1 240 063-291-010 1489 E BAYSHORE RD, EAST PALO ALTO Commercial 1 240 063-292-180 2101 UNIVERSITY AVE, EAST PALO ALTO Industrial 2 474 063-292-370 2117 UNIVERSITY AVE, EAST PALO ALTO #N/A 5 1,209 063-292-380 2160 EUCLID AVE, EAST PALO ALTO #N/A 5 1,209 063-302-170 2283 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-302-180 2281 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-302-210 2263 UNIVERSITY AVE, EAST PALO ALTO Res-Multpl 1 240 063-302-220 2253 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-302-230 2247 UNIVERSITY AVE, EAST PALO ALTO Res-Multpl 1 240 063-302-280 575A BELL ST, EAST PALO ALTO Res-Single 1 240 063-302-290 565 BELL ST, EAST PALO ALTO Res-Single 1 240 063-302-330 2201 UNIVERSITY AVE, EAST PALO ALTO Church 1 240 063-302-340 584 RUNNYMEDE ST, EAST PALO ALTO Res-Single 1 240 063-302-460 2277 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-302-470 2279 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-312-400 , NO DATA #N/A 1 240
063-321-050 2124 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-321-060 2126 UNIVERSITY AVE, EAST PALO ALTO Manual 0 0 063-321-070 , EAST PALO ALTO No hookup 0 0
063-321-080 2142 UNIVERSITY AVE, EAST PALO ALTO Commercial 1 240 063-321-100 2160 UNIVERSITY AVE, EAST PALO ALTO Commercial 2 388 063-321-110 2164 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-321-120 2166 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-321-130 2172 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-321-140 2178 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-321-180 612 BELL ST, EAST PALO ALTO Res-Single 1 240 063-321-190 616 BELL ST, EAST PALO ALTO Res-Single 1 240 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 5 of 10 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 261
Appendix C: Table 2
2014 Zoning Sanitary Sewer Flows
APN Address Land Use from EDS
Equivalent
Dwelling Units
Average Daily
Flow for
Residential , GPD
(1) (1) (2) (3) (4)
063-321-200 644 BELL ST, EAST PALO ALTO Res-Multpl 1 240 063-321-210 2189 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-220 2187 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-230 2181 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-240 2171 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-250 2165 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-260 2161 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-270 2157 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-280 2153 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-290 2149 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-300 2145 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-310 2141 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-320 2133 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-330 2129 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-321-400 2194 UNIVERSITY AVE, EAST PALO ALTO Commercial 1 240 063-321-410 2148 UNIVERSITY AVE, EAST PALO ALTO Restaurant 1 240 063-321-420 , NO DATA #N/A 1 240
063-322-040 2124 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-322-050 2132 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-322-060 2134 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-322-070 2138 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-322-080 2142 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-322-090 2144 CAPITOL AVE, EAST PALO ALTO Res-Multpl 1 240 063-322-100 2154 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-322-110 2162 CAPITOL AVE, EAST PALO ALTO Church 1 240 063-322-130 2184 CAPITOL AVE, EAST PALO ALTO Church 1 240 063-322-140 2194 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-322-150 2198 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-322-160 660 BELL ST, EAST PALO ALTO Res-Single 1 240 063-322-340 2169 COOLEY AVE, EAST PALO ALTO Church 1 344 063-322-410 , NO DATA 0 0 0
063-322-500 2159 COOLEY AVE, EAST PALO ALTO Res-Single 1 240 063-322-560 DONOHOE ST, EAST PALO ALTO Res-Single 1 240 063-322-580 2118 CAPITOL AVE, EAST PALO ALTO #N/A 0 0
063-331-030 2212 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-331-060 2242 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-331-070 2248 UNIVERSITY AVE, EAST PALO ALTO Res-Multpl 1 240 063-331-080 2252 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-331-090 2264 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-331-100 2268 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-331-110 2272 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-331-120 2274 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-331-130 2276 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-331-140 2280 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-331-150 2284 UNIVERSITY AVE, EAST PALO ALTO Res-Single 1 240 063-331-190 2291 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-200 2287 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-210 2285 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-220 2277 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-230 2267 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-240 2263 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-250 2255 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-260 2251 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-270 2249 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-280 2245 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-290 2239 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-300 2233 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 6 of 10 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 262
Appendix C: Table 2
2014 Zoning Sanitary Sewer Flows
APN Address Land Use from EDS
Equivalent
Dwelling Units
Average Daily
Flow for
Residential , GPD
(1) (1) (2) (3) (4)
063-331-310 2227 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-320 2219 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-330 2217 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-340 2205 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-331-350 643 BELL ST, EAST PALO ALTO Res-Single 1 240 063-331-370 2200 UNIVERSITY AVE, EAST PALO ALTO Office 1 358 063-331-380 2240 UNIVERSITY AVE, EAST PALO ALTO Commercial 1 240 063-331-410 2220 UNIVERSITY AVE, EAST PALO ALTO Restaurant 7 1,695 063-442-360 330 DONOHOE ST, EAST PALO ALTO Church 1 240 063-473-150 1995 MANHATTAN AVE, EAST PALO ALTO Res-Multpl 14 3,418 063-473-160 1991 MANHATTAN AVE, EAST PALO ALTO Res-Multpl 14 3,418 063-473-170 1965 MANHATTAN AVE, EAST PALO ALTO Res-Multpl 14 3,418 063-473-180 1955 MANHATTAN AVE, EAST PALO ALTO Res-Multpl 14 3,418 063-473-190 1919 MANHATTAN AVE, EAST PALO ALTO Res-Multpl 14 3,418 063-473-200 1901 MANHATTAN AVE, EAST PALO ALTO Res-Multpl 14 3,418 063-481-010 1699 WOODLAND AVE, EAST PALO ALTO Res-Single 1 240 063-481-020 1681 WOODLAND AVE, EAST PALO ALTO Res-Multpl 1 240 063-481-030 1671 WOODLAND AVE, EAST PALO ALTO Res-Multpl 1 240 063-481-040 1669 WOODLAND AVE, EAST PALO ALTO Res-Single 1 240 063-481-050 1651 WOODLAND AVE, EAST PALO ALTO Res-Multpl 1 240 063-481-060 1643 WOODLAND AVE, EAST PALO ALTO Res-Multpl 1 240 063-481-070 1637 WOODLAND AVE, EAST PALO ALTO Res-Multpl 1 240 063-481-080 1629 WOODLAND AVE, EAST PALO ALTO Res-Single 1 240 063-481-090 1621 WOODLAND AVE, EAST PALO ALTO Res-Multpl 1 240 063-481-100 644 SCOFIELD AVE, EAST PALO ALTO Res-Multpl 1 240 063-481-110 652 SCOFIELD AVE, EAST PALO ALTO Res-Multpl 1 240 063-481-120 660 SCOFIELD AVE, EAST PALO ALTO Res-Multpl 1 240 063-481-130 610 CIRCLE DR, EAST PALO ALTO Res-Multpl 1 240 063-481-140 620 CIRCLE DR, EAST PALO ALTO Res-Multpl 1 240 063-481-150 630 CIRCLE DR, EAST PALO ALTO Res-Single 1 240 063-481-160 640 CIRCLE DR, EAST PALO ALTO Res-Single 1 240 063-481-170 650 CIRCLE DR, EAST PALO ALTO Res-Single 1 240 063-481-180 1917 COOLEY AVE, EAST PALO ALTO Res-Multpl 1 240 063-481-190 1909 COOLEY AVE, EAST PALO ALTO Res-Multpl 1 240 063-481-210 1901 COOLEY AVE, EAST PALO ALTO Res-Multpl 1 240 063-481-220 1905 COOLEY AVE, EAST PALO ALTO Res-Multpl 1 240 063-482-010 641 CIRCLE DR, EAST PALO ALTO Res-Single 1 240 063-482-020 621 CIRCLE DR, EAST PALO ALTO Res-Multpl 1 240 063-482-030 611 CIRCLE DR, EAST PALO ALTO Res-Multpl 1 240 063-483-030 1909 CAPITOL AVE, EAST PALO ALTO Res-Multpl 1 240 063-483-040 1943 CAPITOL AVE, EAST PALO ALTO Res-Multpl 1 240 063-483-050 1609 WOODLAND AVE, EAST PALO ALTO Res-Multpl 1 240 063-484-010 655 SCOFIELD AVE, EAST PALO ALTO Res-Multpl 1 240 063-484-020 1902 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-484-030 1908 CAPITOL AVE, EAST PALO ALTO Res-Single 1 240 063-484-040 1916 CAPITOL AVE, EAST PALO ALTO Res-Multpl 1 240 063-484-050 1920 CAPITOL AVE, EAST PALO ALTO Res-Multpl 1 240 063-484-060 1934 CAPITOL AVE, EAST PALO ALTO Res-Multpl 1 240 063-484-090 1949 COOLEY AVE, EAST PALO ALTO Res-Multpl 1 240 063-484-100 1941 COOLEY AVE, EAST PALO ALTO Res-Multpl 1 240 063-484-110 685 SCOFIELD AVE, EAST PALO ALTO Res-Multpl 1 240 063-484-130 1957 COOLEY AVE, EAST PALO ALTO Res-Multpl 1 240 063-492-070 1927 E BAYSHORE RD, EAST PALO ALTO Res-Single 1 240 063-492-280 1933 PULGAS AVE, EAST PALO ALTO Commercial 1 240 063-492-480 1895 E BAYSHORE RD, EAST PALO ALTO Res-Single 1 240 063-501-020 1874 W BAYSHORE RD, EAST PALO ALTO Commercial 1 240 063-501-030 1870 W BAYSHORE RD, EAST PALO ALTO Commercial 1 240 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 7 of 10 Freyer & Laureta, Inc.

Last Printed: 5/12/2025 263
Appendix C: Table 2
2014 Zoning Sanitary Sewer Flows
APN Address Land Use from EDS
Equivalent
Dwelling Units
Average Daily
Flow for
Residential , GPD
(1) (1) (2) (3) (4)
063-501-040 1879 WOODLAND AVE, EAST PALO ALTO Res-Multpl 1 240 063-501-050 1875 WOODLAND AVE, EAST PALO ALTO Res-Single 1 240 063-511-020 2039 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-511-030 2035 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-511-040 2029 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-511-050 2027 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-511-060 2023 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-511-070 2017 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-511-080 2013 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-511-090 2009 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-511-190 872 DONOHOE ST, EAST PALO ALTO Res-Single 1 240 063-511-200 866 DONOHOE ST, EAST PALO ALTO Res-Single 1 240 063-511-210 864 DONOHOE ST, EAST PALO ALTO Res-Single 1 240 063-511-220 862 DONOHOE ST, EAST PALO ALTO Res-Single 1 240 063-511-240 896 DONOHOE ST, EAST PALO ALTO Res-Single 1 240 063-511-250 860 DONOHOE ST, EAST PALO ALTO Res-Single 1 240 063-511-260 890 DONOHOE ST, EAST PALO ALTO Res-Single 1 240 063-511-490 1731 E BAYSHORE RD, EAST PALO ALTO Restaurant 23 5,615 063-511-520 1761 E BAYSHORE RD, EAST PALO ALTO Commercial 1 240 063-511-630 1721 E BAYSHORE RD, EAST PALO ALTO Restaurant 21 4,925 063-511-660 899 OCONNOR ST, EAST PALO ALTO Commercial 1 240 063-511-680 1751 EAST BAYSHORE RD, EAST PALO ALTO Commercial 1 240 063-511-690 1745 E BAYSHORE BLVD, EAST PALO ALTO Commercial 6 1,467 063-511-720 1775 E BAYSHORE RD, EAST PALO ALTO Commercial 6 1,499 063-515-060 1821 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-515-070 1805 CLARKE AVE, EAST PALO ALTO Res-Single 1 240 063-515-080 1787 WOODLAND AVE, EAST PALO ALTO Res-Single 1 240 063-515-230 1785 WOODLAND AVE, EAST PALO ALTO Res-Single 1 240 063-571-060 1985 E BAYSHORE RD, EAST PALO ALTO Commercial 1 240 063-571-070 1981 E BAYSHORE RD, EAST PALO ALTO No hookup 0 0 063-571-080 1961 E BAYSHORE RD, EAST PALO ALTO Commercial 1 240 063-571-090 1905 E BAYSHORE RD, EAST PALO ALTO Industrial 1 240 114-590-050 (5) NO DATA, EAST PALO ALTO #N/A 0 0
063-680-020 1900 UNIVERSITY AVE, EAST PALO ALTO Office 15 3,500 063-680-050 , NO DATA #N/A 15 3,500
063-680-060 , NO DATA #N/A 15 3,500
063-680-090 , EAST PALO ALTO No hookup 0 0
063-680-100 , EAST PALO ALTO Commercial 1 240
063-680-110 , EAST PALO ALTO Commercial 1 240
063-680-130 2000 UNIVERSITY AVE, EAST PALO ALTO Office 19 4,567 063-680-150 2050 UNIVERSITY AVE, EAST PALO ALTO Motel 19 4,567 063-680-180 , EAST PALO ALTO No hookup 0 0
063-680-190 2000 UNIVERSITY AVE, EAST PALO ALTO Office 1 240 063-730-010 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-020 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-030 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-040 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-050 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-060 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-070 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-080 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-090 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-100 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-110 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-120 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-130 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 063-730-140 2477 PULGAS AVE, EAST PALO ALTO No hookup 0 0 2025 Wastewater Colleciton - Flow Calculations.xlsx Page 8 of 10 Freyer & Laureta, Inc.

← All documents from this meeting