4. Part 4 - Parts List
a. Parts List: A complete parts list shall be furnished, including a generic description and manufacturer’s identification number for each part. Addresses and telephone numbers of the nearest supplier and parts warehouse shall be included.
b. Drawings: Cross-sectional or exploded view drawings shall accompany the parts list.

5. Part 5 - Wiring Diagrams: Diagrams - Part 5 shall include complete internal and connection wiring diagrams for electrical equipment items. All wiring diagrams must reflect final installed conditions, i.e. “as-built”.

6. Part 6 - Shop Drawings: Drawings - This part shall include approved shop or fabrication drawings, complete with dimensions.

7. Part 7 – Safety: Procedures - This part describes the safety precautions to be taken when operating and maintaining the equipment or working near it.

8. Part 8 – Documentation: All equipment warranties, affidavits, and certifications required by the Technical Specifications shall be placed in this part.

15.b
Packet Pg. 578 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONTRACTOR SUBMITTALS
CHLORINE CONVERSION PROJECT 01300-6
C. The Contractor shall furnish to the Resident Project Representative two (2) electronic copies of the O&M Manuals and four (4) hard copies of the final approved manuals. Each set shall consist of one or more volumes, each of which shall be bound in a standard size, 3-ring, loose leaf, vinyl plastic hard cover binder suitable for bookshelf storage. Binder ring size shall not exceed 2.5 inches. A table of contents indicating all equipment in the manuals shall be prepared. Electronic files shall be searchable PDF documents.

D. O&M Manuals shall be submitted in final form not later than the 75 percent of construction completion date. All discrepancies found by the Engineer in the Technical Manuals shall be corrected by the Contractor within 30 days from the date of written notification by the Engineer.

1.07 SPARE PARTS LIST
A. The Contractor shall submit to the Engineer one (1) electronic copy and two (2) hard copies of spare parts information for all mechanical, electrical, and instrumentation equipment as recommended by the manufacturer for each piece of equipment. The spare parts list shall include the current list price of each spare part. The spare parts list shall be limited to those spare parts which each manufacturer recommends be maintained by the City in inventory at the plant site. Each manufacturer or supplier shall indicate the name, address, and telephone number of its nearest outlet of spare parts to facilitate the City in ordering. The Contractor shall cross-reference all spare parts lists to the equipment numbers designated in the Contract Documents.

1.08 RECORD DRAWINGS
A. The Contractor shall keep and maintain, at the job site, one record set of Drawings. On these, it shall mark all project conditions, locations, configurations, and any other changes or deviations which may vary from the details represented on the original Contract Drawings, including buried or concealed construction and utility features which are revealed during the course of construction. Special attention shall be given to recording the horizontal and vertical location of all buried utilities that differ from the locations indicated, or which were not indicated on the Contract Drawings. Said record drawings shall be supplemented by any detailed sketches as necessary or directed to indicate, fully, the work as actually constructed. These master record drawings of the Contractor's representation of as-built conditions, including all revisions made necessary by addenda and change orders shall be maintained up-to-date during the progress of the work.

B. Record drawings shall be accessible to the REPRESENTATIVE, the Engineer, and the City at all times during the construction period.

C. Information on the record drawings shall include:

1. Depths of foundation elements referenced to finished first floor elevation if not shown or where differing from drawings.

15.b
Packet Pg. 579 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONTRACTOR SUBMITTALS
CHLORINE CONVERSION PROJECT 01300-7

2. Horizontal and vertical locations of new and existing underground structures and equipment, referenced to two (2) visible or accessible permanent surface improvements.

3. Location of concealed utilities and appurtenances, referenced to two (2) visible or accessible features of the work.

4. Location of facilities, piping, equipment, and other items at the interface between new and existing work.

5. All changes associated with Addenda, Change Orders, Field Orders, Shop Drawings approval, substitute or "or equal" approval, and the Engineer's written clarification or interpretation. Record drawings shall reference Addenda, Change Orders, etc., by number.

6. Wiring diagrams, as similarly noted in 1.8.B.5, electrical conduit, and other instrumentation installed in any manner different than as shown in the contract drawings. Electrical conduit record information shall include specific northings and eastings for buried conduit.

D. Final payment, or 5% of the total contract (bid) amount, whichever is greater, shall be withheld until the Contractor prepared record drawings have been prepared and delivered to the Engineer. Said up-to-date record drawings shall be in the form of a set of prints with carefully plotted information overlaid in red.

Submitted record drawings that are illegible, disorganized, or otherwise found to be deficient by the Engineer shall be rejected.

E. Upon substantial completion of the work and prior to final acceptance, the Contractor shall finalize and deliver a complete set of record drawings to the Engineer for transmittal to the City, conforming to the construction records of the Contractor. This set of drawings shall consist of corrected drawings showing the reported location of the work. The information submitted by the Contractor and incorporated by the Engineer into the Record Drawings will be assumed to be correct, and the Contractor shall be responsible for the accuracy of such information, and for any errors or omissions which may appear on the Record Drawings as a result.

1.9 QUALITY CONTROL SUBMITTALS
A. Manufacturer’s Certificate of Compliance: When required by the specifications or the Engineer, the Contractor shall submit a certification signed by the manufacturer that the material or product conforms to the refinements of the Contract Documents, including any standards or codes referenced therein.

Certifications shall include factory test results, if applicable.

B. Statement of Qualifications: When required by the specifications or the Engineer, the Contractor shall submit evidence that the surveyor, engineer, specialty subcontractor, consultant, or installer has the experience or specialized knowledge required by the specifications.

15.b
Packet Pg. 580 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONTRACTOR SUBMITTALS
CHLORINE CONVERSION PROJECT 01300-8
C. Field Samples: When required by the specifications or the Engineer, the Contractor shall obtain samples during the progress of the work. The Contractor shall be responsible for transportation of samples, including cost, to a destination directed by the Engineer. Sample source, location, date, name of person obtaining sample, and applicable specification section shall be clearly noted.

Unless otherwise indicated, the samples will remain in the custody of the Engineer.

D. Certificate of Proper Installation: When required by the specifications, the Contractor shall submit a certification signed by the manufacturer or other specialist identified in the specifications that the material or product has been properly installed and is ready for service, based upon field inspection, testing and adjustments, as appropriate.

E. Test Reports: Whenever the specifications require factory or field-testing and submittal of a report, the following information shall be included:

1. Project title and number.

2. Date of test and date of report.

3. Identification of product, material, or equipment tested and applicable specification section.

4. Type of test with reference to standard methods.

5. Test results, certified as complete and accurate.

6. Conclusion or compliance with requirements, and additional interpretation, if requested by Engineer.

7. Recommendations for corrective action necessary to achieve compliance with requirements, if appropriate.

8. Test documentation shall be provided in a three-ring binder(s) within three weeks after the completion of the project. The binder(s) shall be clearly marked on the outside front cover and spine with the words “Test Results”, the project name, and the date of completion (month and year).

Scanner tests shall be printed on 8-1/2” x 11” paper. When repairs and re-tests are performed, the problem found and corrective action taken shall be noted, and both the failed and passed test data shall be collected in the binder.

PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)

END OF SECTION

15.b
Packet Pg. 581 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONTRACTOR SUBMITTALS
CHLORINE CONVERSION PROJECT 01300-9
01300-A. OPERATION AND MAINTENANCE TRANSMITTAL FORM:

Date: Submittal No.:

To: Contract No.:

Spec. Section:

Submittal Description:

From:

Attention:

Contractor Construction Manager
ChecklistSatisfactory N/A Accept Deficient

1. Table of contents ο ο ο ο

2. Equipment record forms ο ο ο ο

3. Manufacturer information ο ο ο ο

4. Vendor information ο ο ο ο

5. Safety precautions ο ο ο ο

6. Operator prestart ο ο ο ο

7. Startup, shutdown and preshutdown ο ο ο ο
procedures

8. Normal operations ο ο ο ο

9. Emergency operations ο ο ο ο

10. Operator service requirements ο ο ο ο

11. Environmental conditions ο ο ο ο

12. Preventative maintenance plan and schedule ο ο ο ο

13. Trouble-shooting guides and diagnostic ο ο ο ο
techniques

15. Wiring diagrams and control diagrams ο ο ο ο

16. Maintenance and repair procedures ο ο ο ο

17. Removal and replacement instructions ο ο ο ο

18. Spare parts and supply list ο ο ο ο

19. Corrective maintenance man-hours ο ο ο ο

15.b
Packet Pg. 582 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONTRACTOR SUBMITTALS
CHLORINE CONVERSION PROJECT 01300-10

20. Parts identification ο ο ο ο

21. Warranty information ο ο ο ο

22. Personnel training requirements ο ο ο ο

23. Testing equipment and special tool ο ο ο ο
information
Remarks:

Contractor’s Signature

15.b
Packet Pg. 583 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONTRACTOR SUBMITTALS
CHLORINE CONVERSION PROJECT 01300-11
01300-B. SUBMITTAL TRANSMITTAL FORM:

File No.

Work Order No. ___________________

SUBMITTAL
SUBMITTAL NO. DATE
PROJECT NAME SPECIFICATION NO.

PROJECT ENGINEER REFERENCE SECTION NO.

Contractor
Address Attention
City State Zip
Telephone FAX
NOTE: Each submittal is reviewed as a unit. Submit only one type of equipment, work item or shop drawing in each submittal.

I hereby certify that I have reviewed the attached submittal and:
□ All Items are in full compliance with the Plans and Technical Specifications □ Exceptions taken: items not in compliance with the Plans and Technical Specifications are listed in the submittal package along with specific deviations.

I understand that failure to list deviations in the submittal package is at the Contractor’s risk and may result in rejection of this submittal or future rejection of materials or equipment when such deviations become apparent and that the Contractor shall be liable for all costs and delays resulting there from.

Signed: _______________________________
Contractor’s Authorized Representative

ITEM DESCRIPTION CITY DIRECTION
(Below this line for City use only)
DIRECTION:

1. NO EXCEPTIONS TAKEN: WORK MAY PROCEED

2. MAKE CORRECTIONS NOTED: WORK MAY PROCEED

3. AMEND-RESUBMIT: WORK MAY NOT PROCEED

4. REJECTED-RESUBMIT: WORK MAY NOT PROCEED

5. OTHER
REMARKS:

Reviewed by:

Project Engineer

15.b
Packet Pg. 584 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONTRACTOR SUBMITTALS
CHLORINE CONVERSION PROJECT 01300-12
This Page Intentionally Left Blank

15.b
Packet Pg. 585 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PRODUCT SUBSTITUTION PROCEDURES
CHLORINE CONVERSION PROJECT 01630-1
SECTION 01630

PRODUCT SUBSTITUTION PROCEDURES
PART 1 GENERAL

1.01 SCOPE
A. Acceptable manufacturers, accepted alternates, and procedures for seeking product substitutions.

1.02 GENERAL REQUIREMENTS
A. Deadline for receipt of Substitution Requests shall expire at 5:00 P.M. Pacific Standard Time, 15 calendar days prior to the date of bid opening published in Notice Inviting Bids.

B. Standard Products: Where products are specified by reference standard, any product meeting the standards referenced may be used. Information on such products shall be submitted in accordance with the requirements of General Conditions, Article 9 and Special Conditions, Article 9.

C. Proprietary Products: Where products or processes are specified by trade, patent or proprietary name, said specification, unless marked "no exceptions", shall be deemed to be followed by the words "or accepted equal accepted in writing by the City's Representative." In such case substitution of similar products as "accepted equals" will be considered under this Section.

D. Selection of Proprietary Product: Where more than one proprietary name is specified, Contractor may provide any one of the products specified. Only one manufacturer shall be used for each specific application throughout the work notwithstanding that similar materials or equipment of two or more manufacturers or producers may be specified for the same application.

E. Substitution Request Procedure: Submit a written request on the enclosed form for proposed substitutions to the City's Representative prior to the deadline for receipt of substitution requests. Submit proposed substitutions relating to a particular subcontract or trade in a single package. If the City accepts any proposed substitutions, such acceptance will be set forth in an Addendum. No substitution will be considered after the deadline for receipt of substitution requests has expired. Requests for substitutions shall be accompanied by a non-refundable cashier's check or money order for $200 made out to the City to compensate the City for the cost of reviewing the substitution request. Check shall clearly show the project name and product or service submitted for review.

F. Systems of Like Manufacture: Where products are specified in groups to be furnished by one manufacturer, no substitution will be considered that is not similarly furnished by one manufacturer. Where Contractor proposes to use a system of equipment other than that shown in the Contract Documents the substitution shall be proposed as a complete system.

15.b
Packet Pg. 586 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PRODUCT SUBSTITUTION PROCEDURES
CHLORINE CONVERSION PROJECT 01630-2

1.03 SUBMITTALS
A. Furnish the following submittals:

Submittal Description
Substitution Request Form Submit Substitution Request on form furnished below.

Contractor 's Certification of
Performance and Assumption of
Liability
Submit Certificate of Performance certifying that the
proposed substitution is equal to or better in all respects to the product specified and that the proposed
substitution will, in all respects perform the function for which it is intended.

Certificate of Compliance Required as needed to substantiate Product Substitutions
Dimensional Data: Required for Product Substitutions
Material Samples Required as needed to substantiate Product Substitutions
Manufacturer's Statement of
Responsibility
Required at City's discretion for Product Substitutions.

Foundry or Test Record
Transcripts
Required as needed to substantiate Product
Substitutions
Material List and Ratings Required as needed to substantiate Product Substitutions
Names and Addresses of Nearest
Local Manufacturer's
Representatives
Required for Product Substitutions (Use allotted space
on attached Substitution Request Form)
List of Three Local Product
Installations
Names and contact information for three installations
within 100-mile radius of project completed in prior three years. Required for Product Substitutions (Use allotted space on attached Substitution Request Form)
Manufacturer’s Service Contract
Statement of Qualifications
Required for installations of products which include
optional maintenance service contracts.

Warranty Furnish warranty equal to or better than warranty required for specified product.

B. Determination of Equality: The burden of proof of equality of the substituted item shall be on the Contractor. Acceptance of such substitutions is entirely at the discretion of the City's Representative.

C. List of Accepted Substitutions: The City will issue to Contractor a list setting forth those substitutions that have been accepted. No products proposed for substitution, shall be ordered before being accepted in writing by the City's Representative.

D. Products accepted as "accepted equals" shall, in the City's opinion, meet the following requirements:

1. Products shall be of equal quality, substance, function and color to those listed.

2. Products shall be standard products of a reputable manufacturer having regularly been engaged for 5 years in manufacture of products furnished.

15.b
Packet Pg. 587 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PRODUCT SUBSTITUTION PROCEDURES
CHLORINE CONVERSION PROJECT 01630-3

3. Products shall have a reputation for assuring long-lasting trouble-free service.

4. Factory-authorized, factory-trained and competent service personnel and stocked service parts shall be available within a 200-mile radius of the work.

5. Manufacturer shall be capable of certifying compliance with listed reference standards.

6. The City reserves the right to reject product substitutions solely on the basis of maintenance economies of scale available to the City through standardizing on manufacturers and minimizing spare parts inventories.

7. Denial of Substitution: If, in the opinion of the City's Representative, the proposed substitution is not equal to or better in every respect to that of the specified product, or was not submitted for acceptance in the manner outlined above, the Contractor shall furnish the specified products.

1.04 CONTRACTOR’S RESPONSIBILITY FOR COST OF SUBSTITUTION REVIEWS A. The Contractor shall pay all costs incurred by the City’s Representative and City to review Requests for Substitutions.

1.05 RESPONSIBILITY FOR SPARE PART INVENTORIES
A. Provide spare parts inventory for two years’ typical maintenance. See Technical Specifications for further information for specific equipment items.

1.06 SUBSTITUTION OF “INFERIOR” PRODUCTS
A. Products not meeting the above requirements shall, for purpose of this contract, be deemed "inferior" even if product's only shortcoming is that Contractor failed to submit a Substitution Request on said product prior to the stipulated deadline.

B. Substitution of "inferior" products shall not occur except where cost savings are offered to and accepted by the City in the form of a Change Order.

1.07 BID SHOPPING AND REVERSE AUCTIONS
A. Substitutions for products and services of manufacturers, system integrators or subcontractors listed at time of bid and/or in Contractor's initial submittal will only be permitted under one or more of the following circumstances:

1. Where Contractor-listed manufacturer, system integrator or subcontractor has gone out of business.

2. Where Contractor-listed manufacturer, system integrator or subcontractor has, in the City's opinion, failed to perform or no longer possesses both capability and willingness to perform to standard required by Contract Documents.

15.b
Packet Pg. 588 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PRODUCT SUBSTITUTION PROCEDURES
CHLORINE CONVERSION PROJECT 01630-4

3. Where Contractor-listed manufacturer, supplier or subcontractor increases price quoted to Contractor above that quoted at time of bid, and Contractor submits evidence of this acceptable to the City.

4. Where Contractor offers a credit to the City sufficient in the Engineer's opinion to justify accepting the substitution in the form of a Change Order.

PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)

END OF SECTION

15.b
Packet Pg. 589 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PRODUCT SUBSTITUTION PROCEDURES
CHLORINE CONVERSION PROJECT 01630-5

SUBSTITUTION REQUEST FORM
TO: ________________________________
Owner
________________________________
Address
________________________________
City/State/ZIP
PROJECT NAME:
_____________________________________________________________ _
FROM CONTRACTOR:
_____________________________________________________________ _
We hereby submit for consideration the following product substitution of specified item for above project:

DRAWING OR
SECTION NO.

SHEET NUMBER

OR PARAGRAPH SPECIFIED ITEM
________________ _________________ _____________________________________

PROPOSED SUBSTITUTION
Attach complete dimensional information and technical data needed to substantiate product substitution, including ICBO reports and laboratory tests, if applicable.

Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation.

Where product substitutions are proposed at multiple locations, submit copies of plans showing in red each location where the product substitution is proposed.

Submit with request all necessary samples and substantiating data to prove equal quality and performance to that which is specified. Clearly mark manufacturer's literature to indicate equality in performance. Differences in quality of materials and construction shall be indicated.

Submit Manufacturer's Statement of Responsibility.

Page 1 of 3 ends

15.b
Packet Pg. 590 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PRODUCT SUBSTITUTION PROCEDURES
CHLORINE CONVERSION PROJECT 01630-6

SUBSTITUTION REQUEST FORM
Fill in Blanks Below:

A. Does the substitution affect dimensions shown on Drawings? Yes ___ No ___ if yes, attach copy of plans and clearly indicate changes.

B. Will the undersigned pay for the changes to the building design, including engineering, detailing and review costs caused by the requested substitution? Yes ___ No ___ C. What effect does the substitution have on other trades?

1. 2.

3. D. What effect does the substitution have on applicable code requirements?

1. 2.

3. E. What is the ICBO Approval Number?
F. Differences between proposed substitution and specified item:

1. 2.

3. G. List three installations where product is in use:

1. 2.

3. H. Address of Authorized Manufacturer’s Representative:

Representative
Address
City/State/Zip
I. Manufacturer’s guarantees of the proposed and specified items are:

Same ____ Different ____ (Explain)
J. Owner’s share of cost savings if substitution is approved $

Page 2 of 3 ends

15.b
Packet Pg. 591 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PRODUCT SUBSTITUTION PROCEDURES
CHLORINE CONVERSION PROJECT 01630-7

SUBSTITUTION REQUEST FORM

CONTRACTOR'S CERTIFICATION OF PERFORMANCE AND

ASSUMPTION OF LIABILITY FOR EQUAL PERFORMANCE
I certify that the proposed substitution is equal to
or better in all respects to the product specified and
that the proposed substitution will, in all respects
perform the function for which it is intended.

For use by Design Engineer:
___ Accepted
___ Accepted as Noted
___ Not Accepted
___ Received Too Late
Submitted By:
______________________________________ By
Signature Title
Date
______________________________________ Remarks
Firm
______________________________________
Address
______________________________________
Telephone Date
Concurrence By:

Owner
Signature must be by person having authority to legally bind his firm to the above terms. Failure to provide legally binding signature will result in retraction of approval.

Page 3 of 3 ends

15.b
Packet Pg. 592 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PRODUCT SUBSTITUTION PROCEDURES
CHLORINE CONVERSION PROJECT 01630-8
This Page Intentionally Left Blank

15.b
Packet Pg. 593 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO INSTALLATION, TESTING, COMMISSIONING AND TRAINING CHLORINE CONVERSION PROJECT 01660-1
SECTION 01660

INSTALLATION, TESTING, COMMISSIONING AND TRAINING
PART 1 GENERAL

1.01. DESCRIPTION
A. This Section covers installation, testing, commissioning and operator training.

1.02 QUALITY ASSURANCE
A. Installation: All mechanical, electrical, and instrumentation equipment provided under this Contract shall be installed in conformity with the details shown and specified and with the manufacturer's requirements. Should a manufacturer's installation recommendations conflict with specific requirements of this Contract Document, the Contractor shall bring the matter to the attention of the City, during the bid period. Any additional costs incurred arising out of changes required by the manufacturer to accommodate manufacturer's installation recommendations will be considered by the Contractor and included in its bid.

Any costs incurred by the Contractor through failure to notify the City of a difference between Contract Document and manufacturer's installation requirements shall be borne by the Contractor.

B. Testing

1. General Requirements: All equipment and partially complete or fully completed portions of the work included in this Contract shall be tested and inspected to prove compliance with the Contract requirements.

Unless otherwise specified, all costs of witness testing or special inspection, including temporary facilities and connections, shall be borne by the Contractor. For the purpose of this Section, equipment shall mean any mechanical, electrical, instrumentation, or other device with one or more moving parts or devices requiring an electrical, pneumatic or hydraulic connection. Installed tests for equipment shall be in accordance with Division 11. Installed leakage tests and other piping tests shall be as specified in Division 15. Installed tests for heating, ventilation, and air conditioning systems shall be as specified in Division 15. Installed tests for electrical devices and systems shall be in accordance with Division 16.

Installed tests for instrumentation devices and systems shall be in accordance with Division 17.

No tests specified herein shall be applied until the item to be tested has been inspected and approved for the application of such test. 2 Tests and inspection shall include:
a. The delivery acceptance test and inspections.
b. The installed tests and inspections.
c. The operational testing of completed sections of the system, using the potable water.

15.b
Packet Pg. 594 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO INSTALLATION, TESTING, COMMISSIONING AND TRAINING CHLORINE CONVERSION PROJECT 01660-2
d. The commissioning of completed sections of the system by City's personnel.

Tests and inspections, unless otherwise specified or accepted, shall be in accordance with the recognized standards of the industry. The Contractor shall see that scheduling and performance of all tests are coordinated with involved subcontractors and suppliers.

The form of evidence of satisfactory fulfillment of delivery acceptance test and inspection requirements shall be, at the discretion of the City, either by tests and inspections carried out in his presence or by certificates or reports of tests and inspections carried out by approved persons or organizations. The Contractor shall obtain forms from the equipment manufacturer. The Contractor must obtain the approval of the City in order to use any form.

A master test logbook shall be maintained by the Contractor which shall cover all tests including piping, equipment, electrical, and instrumentation. The master test logbook shall be provided with loose-leaf pages that shall be copied weekly after updating for transmittal to the City.

3. Delivery Acceptance Tests and Inspections: Where specified for specific pieces of equipment, the delivery acceptance tests and inspections shall include the following. All costs for such tests and inspections shall be borne by the Contractor.

Test of items at the place of manufacture during and/or on completion of manufacture, comprising hydraulic pressure tests, electric and instrumentation subsystems tests, performance and operating tests and inspections in accordance with the relevant standards of the industry and more particularly as details in individual clauses of these Specifications to satisfy the City that the items tested and inspected comply with the requirements of this Contract. Tests other than those specified shall be in accordance with the General Conditions.

Inspection of all items delivered at the site or to any authorized place of storage in order that the City may be satisfied that such items are of the specified quality and workmanship and are in good order and condition at the time of delivery.

The Contractor shall be prepared to remove all coverings, containers or crates to permit the City to conduct his inspection. Should the City find, in his opinion, indication of damage or deficient quality of workmanship, the Contractor shall provide the necessary documentation or conduct such tests deemed necessary by the City to demonstrate compliance. Compensation for tests and work related thereto arising out of this requirement shall be borne by the Contractor.

1.03 INSTALLED TESTS AND INSPECTIONS
A. General: All equipment shall be tested by the Contractor to the satisfaction of the City before any facility start-up and commission. Tests shall be as specified herein and shall be made to determine whether the equipment has been properly assembled, aligned, adjusted and connected. Any changes, adjustments or replacements required to make the equipment operate as specified shall be carried out by the Contractor as part of the work.

15.b
Packet Pg. 595 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO INSTALLATION, TESTING, COMMISSIONING AND TRAINING CHLORINE CONVERSION PROJECT 01660-3
B. Procedures

1. General: Contractor shall submit to the City, details of the installed tests and inspection procedures he proposes to adopt for testing and start-up of all equipment to be operated singly and together, except when such procedures have been covered in the technical Specifications.

The procedures shall be divided into two distinct stages: Preoperation checkout and clean water test. Testing procedures shall be designed to duplicate, as nearly as possible, all conditions of operation and shall be carefully selected to ensure that the equipment is not damaged. Once the testing procedures have been reviewed by the City, the Contractor shall produce checkout, alignment, adjustment and calibration signoff forms for each item of equipment to be used in the field by the Contractor and the City jointly to ensure that each item of electrical, mechanical, and instrumentation equipment has been properly installed and tested. The Contractor is advised that failure to observe these precautions may place the acceptability of the subject equipment in question.

2. Preoperation Checkout: The installed tests and inspection procedures shall incorporate all requirements of these Specifications and shall proceed in a logical, step-wise sequence to ensure that all equipment has been properly serviced, aligned, connected, calibrated and adjusted prior to operation. Preoperation checkout procedures shall include, but not necessarily be limited to:
a. Piping system pressure testing and cleaning as specified in Division 15.
b. Electrical system testing as specified in Division 16. c. Instrumentation system testing as specified in Division 17. d. Alignment of equipment.
e. Preoperation lubrication.

3. Clean Water Test: Clean water shall be employed for the testing of all liquid systems except gaseous and oil. Test media for these systems shall be either the intended fluid or a compatible substitute. The equipment shall be operated a sufficient period of time to determine machine operating characteristics, including temperatures and vibration; to observe performance characteristics; and to permit initial adjustment of operating controls. When testing requires the availability of auxiliary systems such as electrical power, compressed air, liquefied petroleum gas, control air, or instrumentation which have not yet been placed in service, the Contractor shall provide acceptable substitute sources, capable of meeting the requirements of the machine, device or system, at no additional cost to the City. Disposal methods for test media shall be subject to review by the City.

If under test, any portion of the work should fail to fulfill the Contract requirements and is adjusted, altered, renewed or replaced, tests on that

15.b
Packet Pg. 596 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO INSTALLATION, TESTING, COMMISSIONING AND TRAINING CHLORINE CONVERSION PROJECT 01660-4
portion when so adjusted, altered, removed or replaced, together with all other portions of the work as are affected thereby, shall, if so required by the City, be repeated within reasonable time and in accordance with the specified conditions. The Contractor shall pay to the City all reasonable expenses incurred by the City as a result of repeating such tests.

Once simulated operation has been completed, all machines shall be rechecked for proper alignment, realigned, if necessary, and doweled in place. All equipment shall be checked for loose connections, unusual movement or other indications of improper operating characteristics. Any deficiencies shall be corrected to the satisfaction of the City. All machines or devices which exhibit unusual or unacceptable operating characteristics shall be disassembled and inspected. They shall then be repaired or removed from the site and replaced at no cost to the City.

Unless otherwise specified, the Contractor shall provide, at no expense to the City, all power, fuel, compressed air supplies, labor and all other necessary items and work required to complete all tests and inspection specified herein. The Contractor shall provide, at no expense to the City, temporary heating, ventilating and air conditioning for any areas requiring it in the case where permanent facilities are not complete and operable at the time of installed tests and inspections. Temporary facilities shall be maintained until permanent systems are in service.

4. Operational Testing: After completion of all installed testing and certification by the City that all equipment complies with the requirements of the Specifications, the Contractor shall fill all process units and process systems, except those employing non-potable water, domestic water, oil or chemicals, with potable water. All non-potable water, domestic water, oil and chemical systems shall be filled with the specified fluid.

Upon completion of the filling operations, the Contractor shall circulate water through the completed facility for a period of not less than 96 hours, during which all systems shall be operated as a complete facility at various loading conditions, as directed by the City. Should the operational testing period be halted for any reason related to the facilities constructed or the equipment furnished under this contract, or the Contractor's temporary testing systems, the operational testing program shall be repeated until the specified continuous period has been accomplished without interruption. All process units shall be brought to full operating conditions, including temperature, pressure and flow.

Record drawings of facilities involved must be accepted and ready for turnover to the City at the time of operational testing.

All costs required during this operational test shall be borne by the Contractor. The Contractor will supply operational manpower for the 24- hour-per-day testing. The Contractor shall provide the City with the system testing/validation report on the operational testing results. After the successful completion of the operational testing and before commissioning, the Contractor shall coordinate the training of the City’s staffs to avoid conflict of schedules.

15.b
Packet Pg. 597 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO INSTALLATION, TESTING, COMMISSIONING AND TRAINING CHLORINE CONVERSION PROJECT 01660-5

5. Commissioning: After completion of the operational testing, training, and certification by the City that the systems did meet all performance requirements, commissioning will begin. The commissioning period for all systems shall be 15 days. The Contractor shall remove all temporary piping that may have been in use during the operational testing. The City’s personnel will be responsible for operation of the RMS system or portion of the system being operated during this period of time. The RMS system or portion thereof shall be fully operational, accepting all normal flow called for in design and performing all functions as designed.

The Contractor shall be available at all times during commissioning periods to provide immediate assistance in case of failure of any portion of the system being tested. The personnel available shall be experienced in the start-up of wastewater treatment facilities. At the end of the commissioning period, all corrections required by the City to assure a reliable and completely operational facility shall be completed.

The Contractor shall bear the cost of all chemicals that are used during the commissioning period.

During the commissioning period, the City shall be responsible for all normal operational costs, and the Contractor shall bear the costs of all necessary repairs or replacements, including labor and materials, required to keep the portion of the RMS system being commissioned operational.

C. Training: Where specified for specific pieces of equipment, the Contractor shall make available, during the clean water testing phase, experienced factory-trained representatives of the manufacturers of all the various pieces of equipment, to train the City's personnel in the operation and maintenance thereof. The time required for this training shall be as specified in the Specifications for the equipment items. The Contractor shall notify the City of the time of the training at least 15 working days prior to the time of training. The Contractor shall submit a training schedule for all the equipment, systems, and instrumentation indicated in the Specification Sections, including the hours for each training session and name of the trainers, at least 30 days before the first training. The Contractor shall resubmit the schedule every time there is a change in information.

PART 2 MATERIALS AND METHODS

2.01 MATERIALS
A. Installation: Materials employed in the installation shall conform to the requirements of this Contract Document and the recommendations of the equipment manufacturers.

B. Testing

1. Gages, Meters, Recorders, and Monitors: Gages, meters, recorders, and monitors shall be provided by the Contractor as required by the City to supplement or augment the instrumentation system provided under this

15.b
Packet Pg. 598 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO INSTALLATION, TESTING, COMMISSIONING AND TRAINING CHLORINE CONVERSION PROJECT 01660-6
Contract to properly demonstrate that all equipment fully satisfies the requirements of this project manual. All devices employed for the purpose of measuring the performance of the facility's equipment and systems shall be specifically selected to be consistent with the variables to be monitored. All instruments shall be recently calibrated, and the Contractor shall be prepared at all times to demonstrate, through recalibration, the accuracy of all instruments employed for testing purposes. Calibration procedures shall be in accordance with applicable standards of ASTM, ISA, and IEEE. The adequacy of all gages, meters, recorders and monitors shall be subject to review of the City.

2. Records: The Contractor shall provide signoff forms for all installed and operational testing to be accomplished under this Contract. Signoff forms shall be provided for each item of mechanical, electrical and instrumentation equipment provided or installed under this Contract and shall contain provisions for recording relevant performance data for original testing and not less than three retests. Separate sections shall be provided to record values for the preoperation checkout, initials of representatives of the equipment manufacturers, the Contractor, and the City.

The Contractor shall maintain a master file of all equipment signoff sheets, which shall be available for inspection by the City. Upon completion of testing, the Contractor shall furnish scanned images of the completed sign-off forms along with the original signed hardcopy of the signoff sheet for each equipment item.

2.02 METHODS
A. Installation: All equipment and apparatus used in testing shall be installed by specialists properly skilled in the trades and professions required to assure firstclass workmanship. Where required by detailed specifications, the Contractor shall cause the installation of specific equipment testing items to be accomplished under the supervision of factory-trained installation specialists furnished by the equipment manufacturers. The Contractor shall be prepared to document the skills and training of all workmen engaged in the installation of all testing equipment furnished either by the Contractor or the City.

B. Testing: Testing shall proceed on a step-by-step basis in accordance with the Contractor's written testing procedures. The Contractor's testing work shall be accomplished by a skilled team of specialists under the direction of a coordinator whose sole responsibility shall be the orderly, systematic testing of all equipment, systems, structures, and the complete facility as a unit. Each individual step in the procedures shall be witnessed by a representative of the City.

During the operational testing period, all equipment and systems in operation shall be operated to the greatest extent practicable, at conditions which represent the full range of operating parameters as defined by this Contract Document.

C. Training: Training of the City's personnel, where specified, shall be done by experienced technical manufacturers' representatives. These representatives shall follow the outline presented here:

15.b
Packet Pg. 599 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO INSTALLATION, TESTING, COMMISSIONING AND TRAINING CHLORINE CONVERSION PROJECT 01660-7

1. Familiarization
a. Show catalog, parts lists, drawings, etc. and O&M manuals. b. Check out the installation of the specific equipment items. c. Demonstrate the unit and show that all parts of the specifications are met.
d. Answer questions.

2. Safety
a. Point out safety references.
b. Discuss proper precautions around equipment.

3. Operation
a. Point out reference literature.
b. Explain all modes of operation (including emergency). c. Check out City's personnel on proper use of the equipment (let them do it).

4. Preventive Maintenance (PM)
a. Pass out PM list including:
1) Reference material.
2) Daily, weekly, monthly, quarterly, semi-annual and annual jobs.
b. Show how to perform PM jobs.
c. Show City's personnel what to look for as indicators of equipment problems.

5. Corrective Maintenance
a. List possible problems.
b. Discuss repairs - point out special problems.
c. Open up equipment and demonstrate procedures, where practical.

6. Parts
a. Show how to use parts list and order parts.
b. Check over spare parts on hand. Make recommendations.

7. Local Representatives
a. Where to Order Parts: Name, address, telephone.
b. Service problems.

15.b
Packet Pg. 600 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO INSTALLATION, TESTING, COMMISSIONING AND TRAINING CHLORINE CONVERSION PROJECT 01660-8

8. Who to call.

9. How to get emergency help.

END OF SECTION

15.b
Packet Pg. 601 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO TRENCHING BACKFILLING AND COMPACTING
CHLORINE CONVERSION PROJECT 02223-1
SECTION 02223

TRENCHING, BACKFILLING, AND COMPACTING
PART 1 GENERAL

1.01 DESCRIPTION
A. This Section includes materials, testing, and installation for trench excavation, backfilling, and compacting.

1.02 RELATED WORK SPECIFIED ELSEWHERE
A. All related work specified elsewhere, or in other codes or standards, will be as last revised, unless a specific date of issuance is called out in opposition to later revision date(s).

B. Other sections of the technical specifications, not referenced below, shall also apply to the extent required for proper performance of this work.

1.03 TESTING FOR COMPACTION
A. Determine the density of soil in place by the use of a sand cone, drive tube, or nuclear tester.

B. Determine laboratory moisture-density relations of existing soils by ASTM D 1557.

C. Determine the relative density of cohesionless soils by ASTM D 2049.

D. Sample backfill materials by ASTM D 75.

E. Express "relative compaction" as the ratio, expressed as a percentage, of the in place dry density to the laboratory maximum dry density.

F. Compaction shall be deemed to comply with the specifications when no test falls below the specified relative compaction.

G. The Contractor will secure the services of a soils tester and pay the costs of all compaction testing. The Contractor will be responsible for the cost of all retests in failed areas. Test results will be furnished by the City representative.

1.04 PAVEMENT ZONE
A. The pavement zone includes the asphalt concrete and aggregate base pavement section placed over the trench backfill.

1.05 STREET ZONE
A. The street zone is the top 18 inches of the trench or depth determined by the jurisdictional City immediately below the pavement zone in paved areas.

15.b
Packet Pg. 602 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO TRENCHING BACKFILLING AND COMPACTING
CHLORINE CONVERSION PROJECT 02223-2

1.06 TRENCH ZONE
The trench zone includes the portion of the trench from the top of the pipe zone to the bottom of the street zone in paved areas or to the existing surface in unpaved areas.

1.07 PIPE ZONE
A. The pipe zone shall include the full width of trench from the bottom of the pipe or conduit to a horizontal level 12 inches above the top of the pipe. Where multiple pipes or conduits are placed in the same trench, the pipe zone shall extend from the bottom of the lowest pipes to a horizontal level 12 inches above the top of the highest or topmost pipe.

1.08 PIPE BEDDING
A. The pipe bedding shall be defined as a layer of material immediately below the bottom of the pipe or conduit and extending over the full trench width in which the pipe is bedded. Thickness of pipe bedding shall be as shown on the drawings or as described in these specifications for the particular type of pipe installed.

1.09 EXCESS EXCAVATED MATERIAL
A. The Contractor shall make the necessary arrangements for and shall remove and dispose of all excess excavated material unless indicated differently in the special provisions for any job.

B. It is the intent of these specifications that all surplus material not required for backfill or fill shall be properly disposed of by the Contractor at his expense at a proper disposal site.

C. No excavated material shall be deposited on private property unless written permission from the owner thereof is secured by the Contractor. Before the City will accept the work, the Contractor shall file a written release signed by all property owners with whom he has entered into agreements for disposing excess excavated material, absolving the City from any liability connected therewith.

D. The Contractor shall obtain a haul route permit from the City or City having jurisdiction.

1.10 SAFETY
A. All excavations shall be performed, protected, and supported as required for safety and in the manner set forth in the operation rules, orders, and regulations prescribed by the Division of Industrial Safety of the State of California.

B. Barriers shall be placed at each end of all excavations and at such places as may be necessary along excavations to warn all pedestrians and vehicular traffic of such excavations. Lights shall also be placed along excavations from sunset each day to sunrise of the next day until such excavation is entirely refilled.

15.b
Packet Pg. 603 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO TRENCHING BACKFILLING AND COMPACTING
CHLORINE CONVERSION PROJECT 02223-3
C. No trench or excavation shall remain open during non-working hours. The trench or excavation shall be covered with steel plates, spiked in place, or secured with temporary A.C. pavement around the edges, or backfilled.

D. The Contractor shall notify the City of all work-related accidents which may occur to persons or property at or near the project site and shall provide the City with a copy of all accident reports. All accident reports shall be signed by the Contractor or its authorized representative and submitted to the City’s authorized representative within twenty-four (24) hours of the accident’s occurrence.

1.11 ACCESS
A. Unobstructed access must be provided to all driveways, water valves, hydrants, or other property or facilities that require routine use.

1.12 PERMITS
A. All work shall conform to the specifications and requirements of the City having jurisdiction, or and other agencies involved. The Contractor shall keep a copy of all the required permits in the job site and comply with all the terms and conditions of said permits.

PART 2 MATERIALS

2.01 NATIVE EARTH BACKFILL
A. The use of native earth as backfill material will require the approval of the City representative in all cases.

B. Native earth backfill, acceptable for use, shall be fine-grained material free from roots, debris, and rocks with a maximum dimension not larger than 4 inches.

C. Native backfill shall not be used in the pipe zone.

2.02. IMPORTED BACKFILL MATERIAL
A. Whenever the excavated material is not suitable for backfill, the Contractor shall arrange for and furnish suitable imported backfill material that is capable of attaining the required relative density.

B. The Contractor shall dispose of the excess trench excavation as specified in the preceding section. Backfilling with imported material shall be done in accordance with the methods described herein.

2.03 GRANULAR MATERIAL
A. Granular material shall be defined as soil having a minimum sand equivalent of 30 as determined in accordance with State of California, Division of Highways, Test "California 217," with not more than 20% passing a 200-mesh sieve.

15.b
Packet Pg. 604 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO TRENCHING BACKFILLING AND COMPACTING
CHLORINE CONVERSION PROJECT 02223-4

2.04 IMPORTED SAND
A. Imported sand shall have a minimum sand equivalent of 30 per State of California, Division of Highways, Test "California 217" with 100% passing a 3/8- inch sieve and not more than 20% passing a 200-mesh sieve. Certification that the sand meets this requirement shall be provided.

2.05 CRUSHED AGGREGATE BASE
A. Crushed aggregate base shall consist entirely of crushed rock and rock dust.

Crushed rock shall be the product of crushing rock or gravel. Fifty percent of the particles retained on a 3/8-inch sieve shall have their entire surface area composed of faces resulting from fracture due to mechanical crushing. Not over 5% shall be particles that show no faces resulting from crushing. Less than 10% of the particles that pass the 3/8-inch sieve and are retained on the No. 4 sieve shall be weatherworn particles. Gravel shall not be added to crushed rock.

B. The material shall be conformed to the requirements of Greenbook 200-2.2.3 C. Where crushed rock or gravel is specified in the bedding details on the plans, the material shall have the following gradations:

Sieve Size Percentage Passing Sieve
1-1/2” 100
3/4” 90 – 100
3/8” 50-80
No. 4 35-55
No. 30 10-30
No. 200 2-9
ASTM C131 Testing Grading B

2.06 SAND-CEMENT SLURRY
A. Sand-cement slurry shall consist of one sack (94 pounds) of portland cement per cubic yard of sand and sufficient moisture for workability.

PART 3 EXECUTION

3.01 COMPACTION REQUIREMENTS
A. The City will engage the services of a qualified soils engineering firm to determine the relative compaction of the trench backfill.

B. If the backfill fails to meet the specified relative compaction requirements, the Contractor shall rework the backfill until the requirements are met. The Contractor shall make all necessary excavations for density tests as directed by the City representative. Contractor will be responsible for the cost of all additional compaction tests in the reworked areas.

C. Compaction tests shall be performed at random depths and at 200-foot intervals and as directed by the City representative.

15.b
Packet Pg. 605 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO TRENCHING BACKFILLING AND COMPACTING
CHLORINE CONVERSION PROJECT 02223-5
D. Unless otherwise shown on the drawings or otherwise described in the specifications for the particular type of pipe installed, relative compaction in pipe trenches shall be as described below:

1. Pipe Zone and Pipe Base: 90% relative compaction

2. Trench Zone Not Beneath Paving: 90% relative compaction

3. Trench Zone to Street Zone in Paved Areas: 90% relative compaction

4. Street Zone in Paved Areas - Per Agency Requirements: The most stringent City requirements shall prevail

5. Rock Refill Material for Foundation Stabilization: 90% relative density

6. Rock Refill for Over excavation: 90% relative density

3.02. MATERIAL REPLACEMENT
A. Removal and replacement of any trench and backfill material which does not meet the specifications shall be the Contractor's responsibility.

3.03 CLEARING AND GRUBBING
A. Areas where work is to be performed shall be cleared of all rubbish, and other objectionable material of any kind which, if left in place, would interfere with the proper performance or completion of the contemplated work, would impair its subsequent use, or would form obstructions therein.

B. Organic material from clearing and grubbing operations will not be incorporated in the trench backfill.

C. Organic material from clearing and grubbing operations will be disposed of at a proper waste disposal facility.

3.04. SIDEWALK, PAVEMENT, AND CURB REMOVAL
A. Saw cut bituminous or concrete pavements regardless of their thickness, and curbs and sidewalks prior to excavation for the structure in accordance with the requirements of the City, or City having jurisdiction. Curbs and sidewalks that are damaged in the course of construction are to be cut and removed from joint to joint.

B. Haul removed pavement and concrete materials from the site, to a proper disposal facility. These materials are not permitted for use as trench backfill. If the material to be removed exceeds 50 cubic yards, the Contractor shall obtain a haul route permit from the City(s) having jurisdiction.

15.b
Packet Pg. 606 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO TRENCHING BACKFILLING AND COMPACTING
CHLORINE CONVERSION PROJECT 02223-6

3.05 Trenching
A. Excavation for pipe, fittings, and appurtenances shall be open trench to the depth and in the direction necessary for the proper installation of the facilities as shown on the plans.

B. Trench banks shall be kept as near to vertical as possible and shall be properly braced and sheeted.

3.06. BRACING
A. The Contractor's design and installation of bracing and shoring shall be consistent with the rules, orders, and regulations of the State of California Construction Safety Orders.

B. Excavations shall be so braced, sheeted, and supported that they will be safe such that the walls of the excavation will not slide or settle and all existing improvements, will be fully protected from damage.

C. The sheeting, shoring, and bracing shall be arranged so as not to place any stress on portions of the completed work until the general construction thereof has proceeded far enough to provide ample strength.

D. Care shall be exercised in the drawing or removal of sheeting, shoring, bracing, and timbering to prevent the caving or collapse of the excavation faces being supported.

3.07 GRADE
A. Excavate the trench to the lines and grades shown on the drawings with allowance for pipe thickness and for pipe base or special bedding.

B. The trench bottom shall be graded to provide a smooth, firm, and stable foundation that is free from rocks and other obstructions and shall be at a reasonably uniform grade.

3.08 CORRECTION OF OVER EXCAVATION
A. Where excavation is inadvertently carried below the design trench depth, suitable provision shall be made by the Contractor to adjust the excavation, as directed by the City representative, to meet requirements incurred by the deeper excavation.

B. Over excavations shall be corrected by backfilling with approved graded crushed rock or gravel and shall be compacted to provide a firm and unyielding subgrade or foundation, as directed by the City representative.

3.09 DEWATERING
A. The Contractor shall provide and maintain at all times during construction ample means and devices with which to promptly remove and properly dispose of all water from any source entering the excavations or other parts of the work.

15.b
Packet Pg. 607 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO TRENCHING BACKFILLING AND COMPACTING
CHLORINE CONVERSION PROJECT 02223-7
Dewatering shall be done by methods that will ensure a dry excavation and preservation of the final lines and grades of the bottoms of excavations.

Dewatering methods may include well points, sump points, suitable rock or gravel wrapped in filter fabric and placed below the required bedding for drainage and pumping, temporary pipelines, and other means, all subject to the approval of the City representative. Water shall be discharged in accordance with the requirements of the City’s NPDES permit.

B. In no event shall the sewer system be used as drains for dewatering the construction trenches.

C. Dewatering shall commence when groundwater is first encountered and shall be continuous until such times as water can be allowed to rise. No concrete shall be poured in water, nor shall water be allowed to rise around the concrete or mortar until it has set at least eight hours.

3.10 FOUNDATION STABILIZATION
A. Whenever the trench bottom does not afford a sufficiently solid and stable base to support the pipe or appurtenances, the Contractor shall excavate to a depth below the design trench bottom, as directed by the City representative, and the trench bottom shall be backfilled with 3/4-inch rock and compacted to provide uniform support and a firm foundation.

B. Where rock is encountered, it shall be removed to a depth at least 6 inches below grade and the trench shall be backfilled with 3/4-inch crushed rock to provide a compacted foundation cushion.

C. If excessively wet, soft, spongy, unstable, or similarly unsuitable material is encountered at the surface upon which the bedding material is to be placed, the unsuitable material shall be removed to a depth as determined in the field by the City representative and replaced by crushed rock.

3.11 EXCAVATED MATERIAL
A. All excavated material shall not be stockpiled in a manner that will create an unsafe work area or obstruct sidewalks or driveways. Gutters shall be kept clear or other satisfactory measures shall be taken to maintain street or other drainage.

B. In confined work areas, the Contractor may be required to stockpile the excavated material off-site, as determined by the project permits.

3.12 PLACING PIPE BEDDING
A. Place the thickness of pipe bedding material over the full width of trench necessary to produce the required bedding thickness when the material is compacted to the specified relative density. Grade the top of the pipe bedding ahead of the pipe to provide firm, uniform support along the full length of pipe.

B. Excavate bell holes at each joint to permit assembly and inspection of the entire joint.

15.b
Packet Pg. 608 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO TRENCHING BACKFILLING AND COMPACTING
CHLORINE CONVERSION PROJECT 02223-8

3.13 BACKFILLING WITHIN PIPE ZONE
A. Backfill per the detailed piping specification for the particular type of pipe and per the following.

B. After pipe has been installed in the trench, place pipe zone material simultaneously on both sides of the pipe, keeping the level of backfill the same on each side. Carefully place the material around the pipe so that the pipe barrel is completely supported and that no voids or uncompacted areas are left beneath the pipe. Use particular care in placing material on the underside of the pipe to prevent lateral movement during subsequent backfilling.

C. Compact material placed within 12 inches of the outer surface of the pipe by hand tamping only.

3.14 BACKFILL WITHIN TRENCH ZONE
A. Compact per the detailed piping specification for the particular type of pipe and per the following.

B. Push the backfill material carefully onto the backfill previously placed in the pipe zone. Do not permit free fall of the material until at least 2 feet of cover is provided over the top of the pipe. Do not drop sharp, heavy pieces of material directly onto the pipe or the tamped material around the pipe.

C. The remaining portion of the trench to the street zone or ground surface, as the case may be, shall be backfilled, compacted and/or consolidated by approved methods to obtain the specified relative compaction.

1. Compaction using vibratory equipment, tamping rollers, pneumatic tire rollers, or other mechanical tampers shall be done with the type and size of equipment necessary to accomplish the work. The backfill shall be placed in horizontal layers of such depths as are considered proper for the type of compacting equipment being used in relation to the backfill material being placed. Each layer shall be evenly spread, properly moistened, and compacted to the specified relative density. The Contractor shall repair or replace any pipe, fittings, manholes, or structures as directed by the City representative damaged by the Contractor's operations.

2. Consolidation of backfill performed by flooding, poling, or jetting shall obtain a relative compaction of the backfill material at least equal to that specified. When flooding, poling, or jetting methods are used, material for use as backfill shall be placed and consolidated in layers not exceeding 3-feet thick. Flooding, poling, or jetting methods shall be supplemented by the use of vibratory or other compaction equipment when necessary to obtain the required relative compaction. Care shall be taken in all consolidating operations to prevent the movement or floating of the pipe.

Consolidation methods shall not be used where the backfill material is not sufficiently granular to be self-draining during and after consolidation, or where foundation materials may be softened or otherwise damaged by the quantities of water applied. The Contractor shall rectify any

15.b
Packet Pg. 609 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO TRENCHING BACKFILLING AND COMPACTING
CHLORINE CONVERSION PROJECT 02223-9
misalignment of the pipe because of consolidation operations as directed by the City representative.

3.15 BACKFILL WITHIN STREET ZONE
A. The street zone within roadbed areas shall be compacted using approved hand, pneumatic, or mechanical type tampers to obtain the required relative compaction.

B. All work shall be done in accordance with the requirements and to the satisfaction of the City or the City having jurisdiction.

C. Flooding and jetting will not be permitted in this Zone.

3.16 SIDEWALK, PAVEMENT, AND CURB REPLACEMENT
Replace bituminous and concrete pavement, curbs, and sidewalks damaged or removed during construction in accordance with the requirements of the City or the City having jurisdiction.

END OF SECTION

15.b
Packet Pg. 610 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO TRENCHING BACKFILLING AND COMPACTING
CHLORINE CONVERSION PROJECT 02223-10
This Page Intentionally Left Blank

15.b
Packet Pg. 611 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONCRETE FORMWORK
CHLORINE CONVERSION PROJECT 03100-1
SECTION 03100

CONCRETE FORMWORK
PART 1 GENERAL

1.01 THE REQUIREMENT
A. The Contractor shall furnish all materials for concrete formwork, bracing, shoring, and supports and shall design and construct all falsework, in accordance with the provisions of the Contract Documents.

B. Design Requirements

1. Design concrete forms, falsework, and shoring in accordance with local, state, and federal regulations.

2. Design forms and ties to withstand concrete pressures without bulging, spreading, or lifting of forms.

C. Performance Requirements

1. Construct forms so that finished concrete conforms to shapes, lines, grades, and dimensions indicated on the drawings.

2. It is intended that surface of concrete after stripping presents smooth, hard, and dense finish that requires minimum amount of finishing.

3. Provide sufficient number of forms so that the work may be performed rapidly and present uniform appearance in form patterns and finish.

4. Use forms that are clean and free from dirt, debris, concrete, and similar type items. Coat with acceptable form release oil if required, prior to use or reuse.

1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Reinforcement Steel: 03200
B. Joints in Concrete: 03290
C. Cast-in-Place Concrete: 03300
D. Grouts: 03600
E. Joint Sealants: 07900

1.03 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS
A. Comply with the reference specifications as specified in the General Requirements.

15.b
Packet Pg. 612 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONCRETE FORMWORK
CHLORINE CONVERSION PROJECT 03100-2
B. Comply with the current provisions of the following Codes and Standards.

1. American Concrete Institute (ACI)
a. ACI 117 - Standard Specifications for Tolerances for Concrete Construction and Materials.
b. ACI 347 - Recommended Practice for Concrete Formwork.

1.04 CONTRACTOR SUBMITTALS
A. Submittals shall be made in accordance with the General Requirements.

B. Submittals and Specific Information Shall Be Provided: The Contractor shall, in accordance with the requirements in General Requirements submit detailed plans of the falsework proposed to be used. Such plans and calculations shall be in sufficient detail to indicate the general layout, sizes of members, anticipated stresses, grade of materials to be used in the falsework, and typical soil conditions.

1.05 QUALITY ASSURANCE
A. Tolerances: The variation from established grade or lines shall not exceed 1/4- inch in 10 feet and there shall be no offsets or visible waviness in the finished surface. All other tolerances shall be within the "Suggested Tolerances" specified in Section 203 of ACI 347.

B. Regulatory Requirements: Install work of this Section in accordance with local, state, and federal regulations.

PART 2 PRODUCTS

2.01 FORM TIES
A. General

1. Provide form ties for forming system selected that are manufactured by recognized manufacturer of concrete forming equipment.

2. Do not use wire ties or wood spreaders of any form.

3. Provide ties of type that accurately tie, lock, and spread forms.

4. Provide form ties of such design that when forms are removed they locate no metal or other material within 1-1/2 inches of the surface of the concrete.

5. Do not allow holes in forms for ties to allow leakage during placement of concrete.

B. Cone-snap or Flat Bar Form Ties

15.b
Packet Pg. 613 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONCRETE FORMWORK
CHLORINE CONVERSION PROJECT 03100-3

1. Cone-snap ties shall form a cone shaped depression in the concrete with a minimum diameter of 1 inch at the surface of the concrete and 1-1/2 inches deep.

2. Provide neoprene waterseal washer which is located near the center of the concrete.

C. Taper Ties

1. Neoprene Plugs for Taper Tie Holes: Size so that after they are driven, plugs are located in center third of wall thickeners.

2. Drypack Mortar for Filling Taper Tie Holes
a. Consist of mix of 1 part of Portland cement to 1 part of plaster sand.
b. Amount of water to be added to cement-sand mix is to be such that mortar can be driven into holes and be properly compacted. c. Admixtures or Additives: Are not to be used in dry-pack mortar.

2.02 BUILT-UP PLYWOOD FORMS
A. Built-up plywood forms may be substituted for prefabricated forming system subject to following minimum requirements:

1. Size and Material
a. Full size 4 by 8 feet plywood sheets, except where smaller pieces are able to cover entire area.
b. Sheet Construction: 5-ply plywood sheets, 3/4 inch nominal, made with 100 percent waterproof adhesive, and having finish surface that is coated or overlaid with surface which is impervious to water and alkaline calcium and sodium hydroxide of cement.

2. Wales: Minimum 2 by 4 inch lumber.

3. Studding and Wales: Contain no loose knots and be free of warps, cups, and bows.

2.03 STEEL OR STEEL FRAMED FORMS
A. Steel Forms: Provide forms that are:

1. Rigidly constructed and capable of being braced for minimum deflection of finish surface.

2. Capable of providing finish surfaces that are flat without bows, cups, or dents.

15.b
Packet Pg. 614 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONCRETE FORMWORK
CHLORINE CONVERSION PROJECT 03100-4
B. Steel Framed Plywood Forms

1. Provide forms that are rigidly constructed and capable of being braced.

2. Plywood Paneling: 5-ply, 5/8 inch nominal or 3/4 inch nominal, made with 100 percent waterproof adhesive, and having finish surface that is coated or overlaid with surface which is impervious to water and alkaline calcium and sodium hydroxide of cement.

2.04 INCIDENTALS
A. External Angles

1. Where not otherwise indicated on the drawings, provide 3/4 inch bevel, formed by utilizing true dimensioned wood or solid plastic chamfer strip on walkways, slabs, walls, beams, columns, and openings. 2 Provide 1/4 inch bevel formed by utilizing true dimensioned wood or solid plastic chamfer strip on walkways, walls, and slabs at expansion, contraction, and construction joints.

B. Keyways: Steel, plastic, or lumber treated with form coating, applied according to label directions.

C. Inserts: Dovetail anchors or ties
PART 3 EXECUTION

3.01 GENERAL
A. Verification of Conditions

1. Do not place any concrete until all forms have been thoroughly checked for alignment, level, strength, and to assure accurate location of all mechanical and electrical inserts or other embedded items.

2. Removal of Formwork: Do not remove forms from concrete which has been placed when outside ambient air temperature is below 50 degrees Fahrenheit until concrete has attained specified strength as determined by test cylinders stored in field under equivalent conditions as concrete structure.

3.02 FORMS AND ACCESSORIES
A. Vertical Forms

1. Remain in place minimum of 24 hours after concrete is placed.

2. If, after 24 hours, concrete has sufficient strength and hardness to resist surface or other damage, forms may be removed.

B. Other Forms Supporting Concrete and Shoring: Remain in place as follows:

15.b
Packet Pg. 615 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONCRETE FORMWORK
CHLORINE CONVERSION PROJECT 03100-5

1. Sides of Footings: 24 hours minimum.

2. Vertical Sides of Beams, Girders, and Similar Members: 48 hours minimum.

3. Slabs, Beams, and Girders: Until concrete strength reaches specified strength or until shoring is installed.

4. Shoring for Slabs, Beams, and Girders: Shore until concrete strength reaches specified strength.

5. Wall Bracing: Until concrete strength of beams and slabs laterally supporting wall reaches specified strength.

C. Green Concrete

1. No heavy loading on green concrete will be permitted.

2. Green concrete is defined as concrete with less than 100 percent of specified strength.

D. Immediately after forms are removed, carefully examine concrete surfaces, and repair any irregularities in surfaces and finishes as specified in Section 03300.

3.03 FORM TIES
A. Cone-snap Rod and Bar Ties: Tie forms together at not more than 2 foot centers vertically and horizontally. After forms are removed from wall, fill tie holes as follows:

1. Remove form ties from surfaces.

2. Roughen cone shaped tie holes by heavy sandblasting before repair.

3. Dry pack cone shaped tie holes with drypack mortar as specified in Section 03600.

B. Taper Ties - Neoprene Plug in Taper Tie Holes: After forms and taper ties are removed from wall, plug tie holes with neoprene plug as follows:

1. Heavy sandblast and then clean tie holes.

2. After cleaning, drive neoprene plug into each of taper tie holes with steel rod. Final location of neoprene plug shall be in center third of wall thickness. Bond neoprene plug to concrete with epoxy.

3. Locate steel rod in cylindrical recess, made in plug, during driving. a. At no time are plugs to be driven on flat area outside cylindrical recess.

C. Dry Pack of Taper Tie Holes - After Installing Plugs in Tie Holes

15.b
Packet Pg. 616 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONCRETE FORMWORK
CHLORINE CONVERSION PROJECT 03100-6

1. Coat tie hole surface with epoxy bonding agent and fill with drypack mortar as specified in Section 03600.

2. Drypack Mortar: Place in holes in layers with thickness not exceeding tie hole diameter and heavily compact each layer.

3. Dry pack the outside of the hole no sooner than 7 days after the inside of the hole has been dry packed.

3.04 BUILT-UP PLYWOOD FORMS
A. Studding

1. Concrete work.

2. Spaced at 16 inches or 24 inches on center.

3. Closer spacing may be required depending upon strength requirements of the forms, in order to prevent any bulging surfaces on faces of finished Install studs perpendicular to grain of exterior plys of plywood sheets.

B. Wales: Form wales of double lumber material minimum size as specified in this Section.

C. Number of Form Reuses: Depends upon durability of surface coating or overlay used, and ability to maintain forms in condition such that they are capable of producing flat, smooth, hard, dense finish on concrete when stripped.

3.05 STEEL OR STEEL FRAMED FORMS
A. Steel Forms: Adequately brace forms for minimum deflection of finish surface.

B. Steel Framed Plywood Forms: Rigidly construct and brace with joints fitting closely and smoothly.

1. Number of Form Reuses: Depends upon durability of surface coating or overlay used.

C. Built-up plywood forms as specified in this Section may be used in conjunction with steel forms or steel framed plywood forms for special forming conditions such as corbels and forming around items which will project through forms.

3.06 BRACING AND ALIGNMENT OF FORMS
A. Line and Grade: Limit deviations to tolerances which will permit proper installation of structural embedded items or mechanical and electrical equipment and piping.

B. Formwork

1. Securely brace, support, tie down, or otherwise hold in place to prevent any movement.

15.b
Packet Pg. 617 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONCRETE FORMWORK
CHLORINE CONVERSION PROJECT 03100-7

2. Make adequate provisions for uplift pressure, lateral pressure on forms, and deflection of forms.

C. When Second Lift is Placed on Hardened Concrete: Take special precautions in form work at top of old lift and bottom of new lift to prevent:

1. Spreading and vertical or horizontal displacement of forms.

2. Grout "bleeding" on finish concrete surfaces.

D. Pipe Stubs, Anchor Bolts, and Other Embedded Items: Set in forms where required.

E. Cracks, Openings, or Offsets at Joints in Formwork: Close those that are 1/16 inch or larger by tightening forms or by filling with acceptable crack filler.

3.07 INCIDENTALS
A. Keyways: Construct keyways as indicated on the drawings.

B. Exterior Corners: Provide 3/4 inch chamfer unless otherwise specified.

C. Reentrant Angles: May be left square.

D. Level Strips: Install level strips at top of wall concrete placements to maintain true line at horizontal construction joints.

E. Inserts

1. Encase pipes, anchor bolts, steps, reglets, castings, and other inserts, as indicated on the drawings or as required, in concrete.

2. Use dovetail anchors or ties in conjunction with slots or inserts for various materials as specified under other sections of these specifications and as may be necessary for required work.

3.08 PIPE AND CONDUIT
A. Install pipe and conduit in structures as indicated on the drawings, and seal with materials as specified in Section 07900.

3.09 TOLERANCES
A. Finish concrete shall conform to shapes, lines, grades, and dimensions indicated on the drawings.

B. The maximum deviation from true line and grade shall not exceed tolerances listed below at time of acceptance of project.

C. General: Comply with ACI 117, Paragraphs 2.0 through 2.2 and Paragraphs 4.0 through 4.5, except as modified in following:

15.b
Packet Pg. 618 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CONCRETE FORMWORK
CHLORINE CONVERSION PROJECT 03100-8

1. Slabs
a. Slope: Uniformly sloped to drain when slope is indicated on the drawings.
b. Slabs Indicated to Be Level: Have maximum deviation of 1/8 inch in 10 feet without any apparent changes in grade.

D. Inserts: Set inserts to tolerances required for proper installation and operation of equipment or systems to which insert pertains.

E. Maximum Tolerances: As follows:

Item Inches
Sleeves and Inserts Plus 1/8 Minus 1/8
Projected Ends of Anchor Bolts Plus 1/4 Minus 0.0
Anchor Bolt Setting Plus 1/16 Minus 1/16

END OF SECTION

15.b
Packet Pg. 619 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO REINFORCEMENT STEEL
CHLORINE CONVERSION PROJECT 03200-1
SECTION 03200

REINFORCEMENT STEEL
PART 1 GENERAL

1.01 THE REQUIREMENT
A. The Contractor shall furnish, fabricate, and place all concrete reinforcement steel, welded wire fabric, couplers, and concrete inserts for use in reinforced concrete and masonry construction, including all appurtenances such as wires, clips, supports, chairs, spacers, and other accessories, all in accordance with the Contract Documents.

B. The drawings contain general notes concerning amount of reinforcement and placing, details of reinforcement at wall corners and intersections, and details of extra reinforcement around openings in concrete. The Contractor shall submit detailed drawings as specified under Section D.

1.02. RELATED WORK SPECIFIED ELSEWHERE
A. Concrete Formwork: 03100
B. Cast-in-Place Concrete: 03300

1.03. REFERENCE SPECIFICATIONS, CODES, AND STANDARDS
A. Comply with the reference specifications of the General Requirements.

B. Comply with the current provisions of the following Codes and Standards.

1. American Concrete Institute (ACI)
a. ACI 315 - Details and Detailing of Concrete Reinforcement b. ACI 318 - Building Code Requirements for Structural Concrete c. ACI 350 - Code Requirements for Environmental Concrete Structure

2. American Society for Testing and Materials (ASTM)
a. A 143 - Practice for Safeguarding Against Embrittlement of HotDip Galvanized Structural Steel Products and Procedure, for Detecting Embrittlement.
b. A 185 - Specification for Steel Welded Wire Fabric, Plain, for Concrete Reinforcement.
c. A 615 - Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement.
d. A 767 - Specification for Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement.

15.b
Packet Pg. 620 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO REINFORCEMENT STEEL
CHLORINE CONVERSION PROJECT 03200-2

3. American Welding Society (AWS)
a. D1.4 - Structural Welding Code - Reinforcing Steel.

1.04 CONTRACTOR SUBMITTALS
A. Submittals shall be made in accordance with the General Requirements.

B. The following submittals and specific information shall be provided.

1. The Contractor shall furnish shop drawings of all reinforcement steel prior to fabrication in accordance with the Contract Documents.

2. The shop drawings shall include layouts, bending diagrams, assembly diagrams, dimensioned types, locations of all bar laps and splices, placement lists and details of bar reinforcing and accessories including shapes and dimensions. Layout plans for bar supports and chairs, with typical details, shall be included.

3. Changes to reinforcing steel contract drawing requirements:
a. Indicate in separate letter submitted with shop drawings any changes of requirements indicated on the drawings for reinforcing steel.
b. Such changes will not be acceptable unless the District has accepted such changes in writing.

C. Review of shop drawings by the District will be limited to general compliance with the Contract Documents.

D. Samples - Bar Supports: Submit samples of chairs proposed for use along with letter stating where each type chair will be used.

1.05 DELIVERY, STORAGE, AND HANDLING
A. Packing and Shipping: Deliver bars bundled and tagged with identifying tags.

B. Acceptance at Site - Reinforcing Bars: Deliver reinforcing bars lacking grade identification marks accompanied by manufacturer's guarantee of grade.

1.06 SEQUENCING AND SCHEDULING
A. Bar Supports: Do not place concrete until samples and attached data of bar supports has been accepted by the District.

15.b
Packet Pg. 621 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO REINFORCEMENT STEEL
CHLORINE CONVERSION PROJECT 03200-3

1.07 QUALITY ASSURANCE
A. The Contractor shall make provisions for sampling reinforcing steel delivered to the job site. Two sampling bars, cut from different bars and 3 feet in length for bar sizes # 3 through # 5 and 5 feet in length for bars sizes # 6 and larger, shall be taken from each 25 tons or fraction thereof, of each size and heat number delivered to the job site. When the name of the manufacturer, heat identification number, or chemical analysis is not known, the sampling interval shall be each 5 tons or fraction thereof, of each bar size and heat number. The District will pay costs of initial tests. Additional testing, due to failure of initial tests, shall be paid for by the Contractor.

B. If reinforcement steel is spliced by welding at any location, the Contractor shall submit certifications of procedure qualifications for each welding procedure used and certification of welder qualifications, for each welding procedure, and for each welder performing the work. Such qualifications shall be as specified in AWS D1.4.

C. The Contractor shall provide samples of each type of welded splice used in the work in a quantity and of dimensions adequate for testing. At the discretion of the District, radiographic testing of direct butt-welded splices will be performed.

The Contractor shall provide assistance necessary to facilitate testing. The Contractor shall repair any weld, which fails to meet the requirements of AWS D1.4. The District will pay the costs of testing; except, the costs of all tests that fail to meet specified requirements shall be paid by the Contractor.

D. The Contractor shall provide to the Engineer written identification of reinforcement steel by manufacturer's heat number and mill certification, and the fabricator's release number and type from the point of fabrication to the place of final incorporation of the steel into the work.

PART 2 PRODUCTS

2.01 GENERAL
A. Provide reinforcing steel that is new material, of quality specified, free from excessive rust or scale or any defects affecting its usefulness.

2.02 REINFORCING BARS
A. Reinforcing Bars to be Embedded in Concrete or Masonry: Grade 60 deformed bars conforming to ASTM A 615 except as specified in the next subparagraphs.

B. Reinforcement resisting earthquake-induced flexural and axial forces in concrete frame members and in concrete wall boundary members shall comply with low alloy ASTM A 706. ASTM A 615 Grade 60 reinforcement may be used in these members if the following requirements are met:

1. The actual yield strength based on mill tests does not exceed the specified yield strength by more than 18,000 pounds per square inch (retests shall not exceed this value by more than an additional 3,000 pounds per square inch).

15.b
Packet Pg. 622 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO REINFORCEMENT STEEL
CHLORINE CONVERSION PROJECT 03200-4

2. The ratio of the actual ultimate tensile stress to the actual tensile yield strength is not less than 1.25.

C. Hot-Dip Galvanized Reinforcing Bars

1. When reinforcing bars are indicated on the drawings to be hot-dip galvanized, perform such galvanizing in accordance with ASTM A 767 and ASTM A 143.

2. Galvanizing: Galvanize bars in conformance with Class 1 coating and perform galvanizing after fabrication and shearing.

D. Thread Bars

1. Provide thread bars having continuous rolled-in pattern of thread-like deformations along entire length.

2. Provide hex nuts and couplers for the thread bars that develop 125 percent of yield strength of bar.

3. Thread Bars
a. Conform to ASTM A 615 Grade 60.
b. Manufacturers: One of the following or equal:
1). DYWIDAG Systems International, Long Beach, California, DYWIDAG Threadbar.
c. Do not substitute cut threads on regular reinforcing bars for thread bars.

2.03 BAR SUPPORTS
A. Reinforcement Support Chairs

1. Hot-dip Galvanized Steel: Provide hot-dip galvanized steel with plastic tips at surfaces which will be exposed to view. Use unless otherwise indicated on the drawings.

2. Stainless steel where indicated on the drawings.

B. Tie Wires: Annealed steel.

C. Welded Wire Fabric Reinforcement

1. Welded Wire Fabric: ASTM A 185.

2. Fabric may be used in place of reinforcing bars if accepted by the District.

3. Provide fabric in flat sheet form.

15.b
Packet Pg. 623 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO REINFORCEMENT STEEL
CHLORINE CONVERSION PROJECT 03200-5

4. Provide fabric having cross-sectional area per linear foot of not less than cross-sectional area per linear foot of reinforcing bars indicated on the drawings.

2.04 FABRICATION
A. Shop Assembly

1. Cut and bend bars in accordance with provisions of ACI 315 and ACI 318.

2. Bend bars cold.

3. Provide bars free from defects and kinks and from bends not indicated on the drawings.

PART 3 EXECUTION

3.01 GENERAL
A. Verification of Conditions - Reinforcing Bars: Verify that bars are new stock free from rust scale, loose mill scale, excessive rust, dirt, oil, and other coatings which adversely affect bonding capacity when placed in the work.

3.02 PREPARATION
A. Surface Preparation

1. Reinforcing Bars: Thin coating of red rust resulting from short exposure will not be considered objectionable. Thoroughly clean any bars having rust scale, loose mill scale, or thick rust coat.

2. Cleaning of Reinforcement Materials: Remove concrete or other deleterious coatings from dowels and other projecting bars by wire brushing or sandblasting before bars are embedded in subsequent concrete placement.

3.03 INSTALLATION
A. Reinforcing Bars

1. No field bending of bars will be allowed.

2. Welding
a. Weld reinforcing bars where indicated on the drawings or acceptable to the District.
b. Perform welding in accordance with AWS D1.4.

B. Placing Reinforcing Bars

1. Accurately place bars and adequately secure them in position.

15.b
Packet Pg. 624 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO REINFORCEMENT STEEL
CHLORINE CONVERSION PROJECT 03200-6

2. Overlap bars at splices as specified or indicated on the drawings.

3. Unless specifically otherwise indicated on the drawings, install bars at lap splices in contact with each other and fasten bars together with tie wire.

4. If lap splice length for bars in concrete is not specified or indicated on the drawings, bars shall be lap spliced in accordance with ACI 318.

5. If not specified or indicated on the drawings and not specified in Division 4, lap splice bars in masonry in accordance with the California Building Code.

6. Bar Supports
a. Provide in sufficient number to prevent sagging and to support loads during construction, but in no case less than quantities and at locations as indicated in ACI 315.
b. Support reinforcing for concrete placed on ground by standard manufactured chairs, with steel plates for resting on ground. c. Do not use brick, broken concrete masonry units, spalls, rocks, or similar material for supporting reinforcing steel.

7. If not indicated on the drawings, provide protective concrete cover in accordance with ACI 318.

C. Tying of Bar Reinforcement

1. Fasten bars securely in place with wire ties.

2. Tie bars sufficiently often to prevent shifting.

3. There shall be at least 3 ties in each bar length (does not apply to dowel lap splices or to bars shorter than 4 feet, unless necessary for rigidity).

4. Tie slab bars at every intersection around periphery of slab.

5. Tie wall bars and slab bar intersections other than around periphery at not less than every fourth intersection, but at not greater than following maximum spacings:

Bar Size Slab Bars
Spacing
(Inches)
Wall Bars
Spacing
(Inches)
Bars Number 5 and Smaller 60 48
Bars Number 6 through Number 9 96 60
Bars Number 10 and Number 11 120 96

6. After tying wire ties, bend ends of wire ties in towards the center of the concrete section. Wire ties shall conform to the cover requirements of the reinforcing bars.

15.b
Packet Pg. 625 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO REINFORCEMENT STEEL
CHLORINE CONVERSION PROJECT 03200-7

7. Above tying requirements do not apply to reinforcement for masonry.

Refer to Division 4 for tying requirements for masonry.

D. Lap Splices of Reinforcing Bars

1. Where bars are to be lapped spliced at joints in concrete, ensure bars project from concrete first placed, minimum length equal to lap splice length indicated on the drawings.

2. Where lap splice length is not indicated on the drawings, then provide lap splice length as specified in ACI 318 and this Division.

E. Welded Wire Fabric Reinforcement

1. Install necessary wiring, spacing chairs, or supports to keep welded wire fabric in place while concrete is being placed.

2. Bend fabric as indicated on the drawings or required to fit work.

3. Unroll or otherwise straighten fabric to make perfectly flat sheet before placing in the work.

4. Lap splice welded wire fabric as indicated on the drawings.

5. If lap splice length is not indicated on the drawings, splice fabric in accordance with ACI 318.

END OF SECTION

15.b
Packet Pg. 626 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO REINFORCEMENT STEEL
CHLORINE CONVERSION PROJECT 03200-8
This Page Intentionally Left Blank

15.b
Packet Pg. 627 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINTS IN CONCRETE
CHLORINE CONVERSION PROJECT 03290-1
SECTION 03290

JOINTS IN CONCRETE
PART 1 GENERAL

1.01 THE REQUIREMENT
A The Contractor shall construct all joints in concrete at the locations shown.

Joints required in concrete structures are of various types and will be permitted only where shown, unless specifically accepted by the Engineer.

1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Concrete Formwork: 03100
B. Reinforcement Steel: 03200
C. Cast-in-Place Concrete: 03300
D. Joint Sealant: 07900

1.03 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS
A. Comply with the reference specifications of the General Requirements.

B. Comply with the current provisions of the following Codes and Standards:

1. Federal Specifications
a. TT-S-0227E(3) - Sealing Compound, elastomeric type, Multicomponent for Caulking, Sealing, and Glazing Buildings and Other Structures

2. NSF/ANSI Standard 61
a. TPV/TPER Waterstop

3. Commercial Standards
a. ASTM C 920 - Specification for Elastomeric Joint Sealants b. ASTM D 471 - Test Method for Rubber Properties - Effect of Chemicals
c. ASTM D 746 - Test Method for Brittleness Temperature of Plastics and Elastomers by Impact
d. ASTM D 747 - Test Method for Apparent Bending Modulus of Plastics by Means of a Cantilever Beam
e. ASTM D 1752 - Specification for Preformed Sponge Rubber and Cork Expansion Joint Fillers for Concrete Paving and Structural Construction

15.b
Packet Pg. 628 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINTS IN CONCRETE
CHLORINE CONVERSION PROJECT 03290-2
f. ASTM D 2240 - Test Method for Rubber Property -- Durometer Hardness

1.04 CONTRACTOR SUBMITTALS
A. Submittals shall be made in accordance with General Requirements.

B. The following submittals and specific information shall be provided.

1. Joint Sealant

2. Preformed Expansion Joint Material

3. Manufacturer literature including MSDS sheets, installation instructions, and splicing instructions.

4. The Contractor shall submit placement shop drawings showing the location and type of all joints for each structure.

1.05 QUALITY ASSURANCE
A. Waterstop Inspection: It is required that all waterstop field joints shall be subject to inspection, and no such work shall be scheduled or started without having made prior arrangements with the District REPRESENTATIVE to provide for the required inspections. Not less than 24 hours’ notice shall be provided to the District Representative for scheduling such inspections.

B. All field joints in waterstops shall be free of misalignment, bubbles, inadequate bond, porosity, cracks, offsets, and other defects, which would reduce the potential resistance of the material to water pressure at any point. All defective joints shall be replaced with material which shall pass said inspection, and all faulty material shall be removed from the site and disposed of by the Contractor at its own expense.

C. The following waterstop defects represent a partial list of defects which shall be grounds for rejection:

1. Offsets at joints greater than 1/16-inch or 15 percent of material thickness, at any point, whichever is less.

2. Exterior crack at joint, due to incomplete bond, which is deeper than 1/16- inch or 15 percent of material thickness, at any point, whichever is less.

3. Any combination of offset or exterior crack which will result in a net reduction in the cross section of the waterstop in excess of 1/16-inch or 15 percent of material thickness at any point, whichever is less.

4. Misalignment of joint which result in misalignment of the waterstop in excess of 1/2-inch in 10 feet.

5. Porosity in the welded joint as evidenced by visual inspection.

6. Bubbles or inadequate bonding.

15.b
Packet Pg. 629 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINTS IN CONCRETE
CHLORINE CONVERSION PROJECT 03290-3
D. Construction Joint Sealant: The Contractor shall prepare adhesion and cohesion test specimens as specified herein while sealants are being installed.

E. The sealant material shall show no signs of adhesive or cohesive failure when tested in field tests:

1. Sealant specimen shall be prepared between 2 concrete blocks (1-inch by 2-inch by 3-inch). Spacing between the blocks shall be 1/2-inch.

Coated spacers (2-inch by 1-1/2-inch by 1/2-inch) shall be used to insure sealant cross-sections of 1/2-inch by 2 inches with a width of 1/2-inch.

2. Sealant shall be cast and cured according to manufacturer's recommendations except that curing period shall not exceed 24 hours.

3. Following curing period, the gap between blocks shall be widened to one inch. Spacers shall be used to maintain this gap for 24 hours prior to inspection for failure.

1.06 TYPES OF JOINTS
A. Construction Joints: When fresh concrete is placed against a hardened concrete surface, the joint between the two pours is called a construction joint. Unless otherwise specified, all joints in water or liquid bearing members shall be provided with a waterstop and sealant groove of the shape specified and as shown on the plans.

B. Contraction Joints: Contraction joints are similar to construction joints except that the fresh concrete shall not bond to the hardened surface of the first pour, which shall be coated with a bond breaker. The slab reinforcement shall be stopped 4-1/2 inches from the joint; which is provided with a sleeve-type dowel, to allow shrinkage of the concrete of the second pour. Waterstop and sealant groove shall also be provided.

C. Expansion Joints: To allow the concrete to expand freely, a space is provided between the two pours, the joint shall be formed as shown on the plans. This space is obtained by placing a filler joint material against the first pour, which acts as a form for the second pour. Unless otherwise specified, all expansion joints in water bearing members shall be provided with an approved type waterstop.

Premolded expansion joint material shall be installed with the edge at the indicated distance below or back from finished concrete surface, and shall have a slightly tapered, dressed, and oiled wood strip secured to or placed at the edge thereof during concrete placement, which shall later be removed to form space for sealing material. The space so formed shall be filled with a joint sealant material as specified in the Paragraph in Part 2 entitled "Joint Sealant." In order to keep the two elements in line the joint shall be provided with a sleeve-type dowel as shown.

D. Control Joints: The function of the control joint is to provide a weaker plane in the concrete, where shrinkage cracks will probably occur. A groove, of the shape

15.b
Packet Pg. 630 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINTS IN CONCRETE
CHLORINE CONVERSION PROJECT 03290-4
and dimensions as shown on the plans, is formed or saw-cut in the concrete and shall be filled with a joint sealant material as specified in the Paragraph in Part 2 entitled "Joint Sealant."

1.07 GUARANTEE
A. The Contractor shall provide a 5-year written guarantee of the entire sealant installation against faulty and/or incompatible materials and workmanship, together with a statement that it agrees to repair or replace, to the satisfaction of the Engineer, at no additional cost to the District, any such defective areas which become evident within said 5-year guarantee period.

PART 2 PRODUCTS

2.01 TPV/TPER WATERSTOPS
A. General: Waterstops shall be extruded from thermoplastic Vulcanizate (TPV) or thermoplastic Elastomeric Rubber (TPER) compound containing plasticizers, resins, stabilizers, and other materials necessary to meet the requirements of these specifications. Waterstops shall be 4-inches wide for 8-inch walls or 6-inches wide for 10-inches or greater walls with a 7/16-inch minimum diameter hollow-center bulb, ribbed-type, as shown on the plans. No reclaimed or scrap material shall be used.

B Flatstrip and Center-Bulb Waterstops: Flatstrip and center-bulb waterstops shall be as detailed and as manufactured by: Earth Shield Chemical Resistant Waterstop by JP Specialties, Inc., Lake Elsinore, California; Envirostop TPER by Westec Barrier Technologies (Greenstreak Group, Inc.), St Louis, Missouri; or equal; provided, that at no place shall the thickness of flat strip waterstops, including the center bulb type, be less than 3/16-inch.

2.02 JOINT SEALANT
A. Conform to the requirements of Section 07900, Joint Sealants.

2.03 PREFORMED JOINT FILLER
A. Preformed joint filler material shall be of the preformed non-extruding type joint filler constructed of cellular neoprene sponge rubber or polyurethane of firm texture. All non-extruding and resilient-type preformed expansion joint fillers shall conform to the requirements and tests set forth in ASTM D 1752 for Type I, except as otherwise specified herein.

B. Bituminous Fiber Expansion Joint Filler: Bituminous fiber expansion joint filler shall not be used unless called for in the specifications or shown on the drawings. Bituminous fiber expansion joint filler shall be in accordance with ASTM D 1751. Bituminous expansion joint material shall not be used in joints to be sealed with synthetic rubber sealing compound.

15.b
Packet Pg. 631 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINTS IN CONCRETE
CHLORINE CONVERSION PROJECT 03290-5

2.04 BACKING ROD
A. Backing rod shall be an extruded closed-cell, polyethylene foam rod or an expanded closed-cell sponge rubber, manufactured from a synthetic polymer neoprene base. The material shall be compatible with the joint sealant material used and shall have a tensile strength of not less than 40 psi and a compression deflection of approximately 25 percent at 8 psi. The diameter of the filler rod shall be 25 percent greater than the nominal joint width.

B. Filler rod shall be Sonofoam Backer Rod manufactured by Sonneborn, Inc., or Rod Stock manufactured by Rubatex Corporation, or equal. The manufacturer's instructions for surface preparation and application shall be used as a guide for installation, except that the material shall not be installed by stretching beyond its normal length.

2.05 BOND BREAKER
A. Bond breaker shall be Super Bond Breaker as manufactured by Burke Company, San Mateo, California; Hunt Process 225-TU as manufactured by Hunt Process Co., Santa Fe Springs, California; Select Cure CRB as manufactured by Select Products Co., Upland, California; or equal. It shall contain a fugitive dye so that areas of application will be readily distinguishable.

PART 3 EXECUTION

3.01 JOINTS
A. Joints in concrete work shall be of the type and in the position indicated on the Contract Documents. No change in the joint position will be allowed unless approved by the District.

B. All joints in concrete shall be thoroughly cleaned by sandblasting, including reinforcing steel, of all laitance, grease, oil and dirt prior to commencing concrete placement. The Contractor shall obtain approval of the joint details prior to commencing the next pour.

3.02 JOINT CONSTRUCTION
A. Joint Location: Construction joints, and other types of joints, shall be provided where shown. When not shown, construction joints shall be provided at 25-foot maximum spacing for all concrete construction, unless noted otherwise. Where joints are shown spaced greater than 25 feet apart, additional joints shall be provided to maintain the 25-foot maximum spacing. The location of all joints, of any type, shall be submitted for acceptance by the Engineer.

B. Joint Preparation: Special care shall be used in preparing concrete surfaces at joints where bonding between two sections of concrete is required. Unless otherwise shown, such bonding will be required at all horizontal joints in walls.

Surfaces shall be prepared in accordance with the requirements of Section 03300, Cast-in-Place Concrete. Except on horizontal wall construction joints, wall to slab joints or where otherwise shown or specified, at all joints where

15.b
Packet Pg. 632 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINTS IN CONCRETE
CHLORINE CONVERSION PROJECT 03290-6
waterstops are required, the joint face of the first pour shall be coated with a bond breaker as specified herein.

C. Construction Joint Sealant

1. Construction joints in water or liquid bearing floor slabs, and elsewhere as shown, shall be provided with tapered grooves which will be filled with construction joint sealant. The material used for forming the tapered grooves shall be left in the grooves until just before the grooves are cleaned and filled with joint sealant. After removing the forms from the grooves, all laitance and fins shall be removed, and the grooves shall be sand-blasted. The grooves shall be allowed to become thoroughly dry, after which they shall be blown out; immediately thereafter, they shall be primed and filled with the construction joint sealant. The primer used shall be supplied by the same manufacturer supplying the sealant. No sealant will be permitted to be used without a primer. Care shall be used to completely fill the sealant grooves. Areas designated to receive a sealant filler shall be thoroughly cleaned, as outlined for the tapered grooves, prior to application of the sealant.

2. Expansion joint filler shall be held in place by glue. Nails shall not be driven through the filler material.

3. Sealant application shall be in accordance with the manufacturer's printed instructions. The surfaces of the groove for the sealant shall not be coated. Concrete next to waterstops shall be placed in accordance with the requirements of Section 03300, Cast-in-Place Concrete.

4. The primer and sealant shall be placed strictly in accordance with the printed recommendations of the manufacturer, taking special care to properly mix the sealant prior to application. All sealant shall cure at least 7 days before the structure is filled with water.

5. All sealant shall be installed by a competent waterproofing specialty Contractor who has a successful record of performance in similar installations. Before work is commenced, the crew doing the work shall be instructed as to the proper method of application by a representative of the sealant manufacturer.

D. Any joint sealant which after the manufacturer's recommended curing time for the job conditions of the work hereunder, fails to fully and properly cure shall be completely removed; the groove shall be thoroughly sandblasted to remove all traces of the uncured or partially cured sealant and primer, and shall be resealed with the specified joint sealant. All costs of such removal, joint treatment, re-sealing, and appurtenant work shall be at the expense of the Contractor.

END OF SECTION

15.b
Packet Pg. 633 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-1
SECTION 03300

CAST-IN-PLACE CONCRETE
PART 1 GENERAL

1.01 DESCRIPTION
A. The Contractor shall furnish all materials for cast-in-place concrete in accordance with the provisions of this Section and shall form, mix, place, cure, repair, finish, and do all other work as required to produce finished concrete, in accordance with the requirements of the Contract Documents.

B. Unless specifically indicated otherwise in the Contract Documents, all concrete work, including steel reinforcing, shall be in accordance with the best standard practices as set forth in the ACI Building Code, Manuals and Recommended Practices.

1.02 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS
A. American Concrete Institute (ACI)

1. ACI 301 - Specifications for Structural Concrete for Buildings

2. ACI 315 - Details and Detailing of Concrete Reinforcement

3. ACI 318 - Building Code Requirements for Structural Concrete

4. ACI 350 - Code Requirements for Environmental Concrete Structure B. American Society for Testing and Materials (ASTM)

1. C 31 - Practice for Making and Curing Concrete Test Specimens in the Field.

2. C 33 - Specification for Concrete Aggregates.

3. C 39 - Test Method for Compressive Strength of Cylindrical Concrete Specimens.

4. C 40 - Test Method for Organic Impurities in Fine Aggregates for Concrete.

5. C 42 - Method of Obtaining and Testing Drilled Cores and Sawed Beams of Concrete.

6. C 88 - Test Method of Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate.

7. C 94 - Specification for Ready-Mixed Concrete.

15.b
Packet Pg. 634 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-2

8. C 114 - Test Methods for Chemical Analysis of Hydraulic Cement.

9. C 131 - Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine.

10. C 136 - Test Method for Sieve Analysis of Fine and Coarse Aggregates.

11. C 143 - Test Method for Slump of Hydraulic Cement Concrete.

12. C 150 - Specification for Portland Cement.

13. C 157 - Test Method for Length Change of Hardened Hydraulic-Cement Mortar and Concrete.

14. C 172 - Practice for Sampling Freshly Mixed Concrete.

15. C 173 - Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method.

16. C 203 - Test Methods for Breaking Load and Flexural Properties of BlockType Thermal Insulation.

17. C 227 - Test Method for Potential Alkali Reactivity of Cement-Aggregate Combinations (Mortar-Bar Method).

18. C 260 - Specification for Air-Entraining Admixtures for Concrete.

19. C 289 - Test Method for Potential Alkali-Silica Reactivity of Aggregates (Chemical Method).

20. C 309 - Specification for Liquid Membrane-Forming Compounds for Curing Concrete.

21. C 311 - Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use as a Mineral Admixture in Portland-Cement Concrete.

22. C 469 - Test Method for Static Modulus of Elasticity and Poisson's Ratio of Concrete in Compression.

23. C 494 - Specification for Chemical Admixtures for Concrete.

24. C 595M - Specification for Blended Hydraulic Cements.

25. C 618 - Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Portland-Cement Concrete.

26. D 75 - Practices for Sampling Aggregates.

1.03 SUBMITTALS
A. Submittals shall be made in accordance with General Conditions, Article 9 and Special Conditions, Article 9.

15.b
Packet Pg. 635 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-3
B. The following submittals and specific information shall be provided.

1. Mix Designs: Prior to beginning the work, the Contractor shall submit to the City, for review, and approval, preliminary concrete mix designs for each class and type of concrete specified herein. The mix designs shall be submitted in accordance with Flowchart indicated in Figure R5.3 of ACI 318. Mix designs shall be signed and stamped by a California registered Civil or Structural Engineer. The mix designs shall be tested by an independent testing laboratory acceptable to the District. All costs related to such mix design shall be borne by the Contractor.

2. Each concrete mix submittal shall contain the following information:
a. Slump on which the design is based.
b. Total gallons of water per cubic yard.
c. Brand, type, composition and quantity of cement.
d. Brand type, composition and quantity of fly ash.
e. Source, specific gravity, gradation, and a copy of ASTM C289 testing certification of each aggregate.
f. Ratio of fine to total aggregate per cubic yard.
g. Weight (surface dry) of each aggregate per cubic yard. h. Brand, type, and ASTM designation, active chemical ingredients and quantity of each admixture.
i Copy of the Building and Safety Research Report Approval for each concrete admixture.
j. Air content.
k. Compressive strength based on 7 day and 28 day compression tests, including standard deviation calculations, corroborative data (if applicable), and required average comprehensive strength per ACI 318, Section 5.
l. Time of initial set.
m. Certification stamp and signature by a Civil or Structural Engineer registered in the State of California.
n. Certificate of Compliance for Cement.
o. Copy of ACI 318 Flowchart Fig. R5.3 indicating submittal procedure.

3. Certified Delivery Tickets: Where ready-mix concrete is used, the Contractor shall provide certified weighmaster delivery tickets at the time of delivery of each load of concrete, which shall contain the following information:
a. Date
b. Name of Vendor

15.b
Packet Pg. 636 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-4
c. Name of Contractor
d. District job/contract number
e. Public weighmaster's signature
f. Number of cubic yards in the load
g. Actual weights of cement, pozzolan and of each size of aggregate h. Amount of water added at the plant (including free water in aggregate)
i. Amount of water in the aggregate
j. Brand and type of cement
k. Brand and amount of admixture (if used)
l. Amount of water allowed to be added at the site for the specific design mix
m. Amount of water added at the jobsite
n. Time and when the batch was dispatched
o. Time when the batch left the plant
p. Time unloading began
q. Time unloading finished

4. When a water reducing admixture is to be used, the Contractor shall furnish mix designs for concrete both with and without the admixture.

5. The Contractor shall furnish a Certificate of Compliance signed by the supplier identifying the type of fly ash and stating that the fly ash complies with ASTM C 618 and these specifications, together with all supporting test data prior to the use of the fly ash the sample represents. The supporting data shall also contain test results confirming that the fly ash in combination with the cement and water to be used meets all strength requirements and is compatible with air-entraining agents and other admixtures.

C. The Contractor shall submit to the District for review the design mix for fly ash concrete together with the design mix for Portland cement (non-fly ash) concrete as specified in this Section.

1.04 QUALITY ASSURANCE
A. Tests on component materials and for compressive strength and shrinkage of concrete will be performed as specified herein. Test for determining slump will be in accordance with the requirements of ASTM C 143.

B. The cost of all laboratory tests on cement, aggregates, and concrete, will be borne by the District. However, the Contractor shall be charged for the cost of any additional tests and investigation on work performed which does not meet the specifications.

15.b
Packet Pg. 637 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-5
C. Concrete for testing shall be supplied by the Contractor at no cost to the District, and the Contractor shall provide assistance and facilities to the Inspector in obtaining samples, and disposal and cleanup of excess material.

D. Field Compression Tests

1. During the progress of construction, the District will employ an independent testing firm to determine whether the concrete, as being produced, complies with the standards of quality specified herein. These tests shall be made in accordance with ASTM C 31 and ASTM C 39.

2. Compression test specimens will be taken during construction from the first placement of each class of concrete specified herein and at intervals thereafter as selected by the District Representative to insure continued compliance with these specifications. Each set of test specimens will be a minimum of 3 cylinders.

3. The Contractor shall furnish the concrete for such tests but the remaining testing expense will be borne by the District. Specimens will be cured under job conditions.

4. Compression test specimens for concrete shall be made in accordance with ASTM C 31. Specimens shall be 6-inch diameter by 12-inch high cylinders.

5. For all concrete, the standard age of tests will be 28 days but 7-day tests may be used as an indication of the 28-day strength, provided that the relation between the 7- and 28-day strengths of the concrete is established by tests for the materials and proportions used. Compression tests shall be performed in accordance with ASTM C 39. One test cylinder will be tested at 7 days as necessary and one at 28 days. Any remaining cylinders will be held to verify test results, if needed.

E. Evaluation and acceptance of compressive strength concrete shall be based on the following criteria:

1. Concrete shall be sampled and tested in accordance with the ASTM's stated in Section 1.2, B. 2.

2. Acceptance of concrete placed shall be based on 28-day compressive strength test results. A 28-day compressive strength test shall consist of the average compressive strength of two concrete test cylinders fabricated from a single load of fresh concrete except that, if a cylinder should show evidence of improper handling, molding, or testing, said cylinder shall be discarded and the compressive strength test shall then consist of the remaining cylinder.

3. Concrete compressive strength tests representing concrete poured-inplace, shall attain the 28-day compressive strength specified.

4. At least the specified minimum cement shall be used, and more cement

15.b
Packet Pg. 638 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-6
shall be used if necessary to meet all minimum requirements shown in the table. Failure to meet these conditions shall be considered failure of the concrete.

5. The strength level of the concrete will be considered satisfactory if the averages of all sets of three consecutive strength test results equal or exceed the required strength and no individual strength test falls below the required strength by more than 500 psi. Where an individual strength test falls below the required strength by more than 500 psi, the District Representative shall have the right to ask for additional curing of the affected portion followed by cores taken in accordance with ASTM C 42 and ACI 318, all at the Contractor's expense. If the additional curing does not bring the average of three cores taken in the affected area to at least the strength specified, the District may require strengthening of the affected portions of the structures by means of additional concrete or steel or replacement may be required of those affected portions, all at the Contractor's expense.

6. In-place concrete represented by a compressive cylinder Strength test failing to meet the specified 28-day compressive strength shall be removed from the work at no cost to the District. Also, the Contractor shall at its own expense make any corrective changes in the mix deemed necessary by the District. The changes in the mix proportions or placement procedures shall be submitted to the District prior to the placement of any additional concrete subsequent to a failing compressive strength test.

7. As an alternative to the removal of concrete represented by a failed cylinder compressive strength test and subject to the approval of the District, the concrete represented by the failed compressive strength cylinder test or tests may be cored in place. The corings shall by completed no later than 10 days from notification of failure by the District.

The cores shall be taken by the Contractor in the presence of the District Representative and tested at the Contractor's expense in accordance with ASTM C 42 by a certified laboratory acceptable to the District. The cores shall be 4 inch diameter (min.) unless otherwise directed by the District Representative. At least three cores shall be taken in each area represented by a failed 28-day concrete compressive strength cylinder test. Unless otherwise directed by the District Representative, the cores shall be tested wet following a 40-hour submergence. If each core tests at least 85 percent or greater than the specified 28-day compressive strength, the concrete represented may be accepted provided the Contractor accepts the payment provisions stated below. Concrete represented by failing core tests shall not be paid for and shall be removed by the Contractor from the work at no cost to the District.

8. Payment to the Contractor for concrete accepted by the District based on core test results but represented by failing compressive cylinder test results shall be reduced as follows:

15.b
Packet Pg. 639 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-7
a. When the result of a single compressive cylinder strength test is less than the specified 28-day compressive strength but 95 percent or more of the 28-day compressive strength, the Contractor shall pay the District $15 per cubic yard for each inplace cubic yard of concrete represented by the deficient compressive strength cylinder test as determined by the actual sampling interval; and.
b. When the result of a single compressive strength cylinder test is less than 95 percent of the specified 28-day compressive strength but is acceptable based on core test results taken in accordance with Section 1.4, E(5), the Contractor shall pay the District $20 per cubic yard for each in-place cubic yard of concrete represented by the deficient compressive strength cylinder test as determined by the actual sampling interval.

F. Shrinkage Tests

1. Drying shrinkage tests shall be provided by the Contractor for the trial batch specified in Section 2.4 and during construction to insure continued compliance with these specifications.

2. Drying shrinkage specimens shall be 4-inch by 4-inch by 11-inch prisms with an effective gage length of 10 inches, fabricated, cured, dried and measured in accordance with ASTM C 157 modified as follows:
specimens shall be removed from molds at an age of 23 +/- 1 hours after trial batching, shall be placed immediately in water at 70 degrees F +/- 3 degrees F for at least 30 minutes, and shall be measured within 30 minutes thereafter to determine original length and then submerged in saturated lime water at 73 degrees F +/- 3 degrees F. Measurement to determine expansion expressed as a percentage of original length shall be made at age 7 days. This length at age 7 days shall be the base length for drying shrinkage calculations ("0" days drying age). Specimens then shall be stored immediately in a humidity control room maintained at 73 degrees F +/- 3 degrees F and 50 percent +/- 4 percent relative humidity for the remainder of the test. Measurements to determine shrinkage expressed as percentage of base length shall be made and reported separately for 7, 14, 21, and 28 days of drying after 7 days of moist curing.

3. The drying shrinkage deformation of each specimen shall be computed as the difference between the base length (at "0" days drying age) and the length after drying at each test age. The average drying shrinkage deformation of the specimens shall be computed to the nearest 0.0001- inch at each test age. If the drying shrinkage of any specimen departs from the average of that test age by more than 0.0004-inch, the results obtained from that specimen shall be disregarded. Results of the shrinkage test shall be reported to the nearest 0.001 percent of shrinkage. Compression test specimens shall be taken in each case from the same concrete used for preparing drying shrinkage specimens.

These tests shall be considered a part of the normal compression tests

15.b
Packet Pg. 640 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-8
for the project. Allowable shrinkage limitations shall be as specified in Part 2, herein.

G. Construction Tolerances: The Contractor shall set and maintain concrete forms, sleeves and inserts and perform finishing operations so as to ensure that the completed work is within the tolerances specified herein. Surface defects and irregularities are defined as finishes and are to be distinguished from tolerances.

Tolerance is the specified permissible variation from lines, grades, or dimensions shown. Where tolerances are not stated in the specifications, permissible deviations will be in accordance with ACI 347.

H. The following construction tolerances are hereby established as maximum allowable and apply to finished walls and slab unless otherwise shown:

Variation of the constructed linear outline from the
established position in plan
In 10 feet: 1/8-inch
In 20 feet or more: 1/4-inch
Variation from the level or from the grades shown In 10 feet: 1/8-inch In 20 feet or more: 1/4-inch
Variation from the plumb In 10 feet: 1/8-inch
In 20 feet or more: 1/4-inch
Variation in the thickness of slabs and walls Plus 1/4-inch; minus 1/8- inch
Variation in the locations and sizes of slabs and wall
openings
Plus or minus 1/8-inch
Sleeves and inserts Plus or minus 1/8-inch
Projected ends of anchor bolts Plus 1/4-inch; minus 1/8- inch
Anchor bolt settings Plus or minus 1/16-inch
I. Slabs shall be uniformly sloped to drain.

J. Regardless of the tolerances listed herein, it shall be the responsibility of the Contractor to limit deviations in line and grade to tolerances which will permit proper installation and operation of mechanical equipment and piping. The Contractor shall review vendor recommendations and incorporate them in the work.

K. For each class of fly ash, all testing and sampling procedures shall conform with these specifications and ASTM C 311, including the restriction that one sample weighing 4 pounds shall be taken from at least each 200 tons of fly ash supplied.

L. Separate storage facilities shall be provided for fly ash. Fly ash shall be stored in such a manner as to permit ready access for the purpose of inspection and sampling and suitably protected against contamination or moisture. Should any fly ash show evidence of contamination or moisture or be otherwise unsuitable, the Inspector may reject it and require that it be removed from the site. Each class of fly ash used in concrete for this project shall be from the same source.

PART 2 PRODUCTS

15.b
Packet Pg. 641 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-9

2.01 MATERIALS
A. Aggregate: General

1. Provide concrete aggregates that are sound, uniformly graded, and free of deleterious material in excess of allowable amounts specified.

2. Grade aggregate in accordance with ASTM D 75 and C 136.

3. Provide unit weight of fine and coarse aggregate which produces in place concrete with weight of not less than 140 pounds per cubic foot.

B. Fine Aggregate

1. Provide fine aggregate for concrete or mortar consisting of clean, natural sand or of sand prepared from crushed stone or crushed gravel.

2. Do not provide aggregate having deleterious substances in excess of following percentages by weight of contaminating substances. In no case shall total exceed percent listed.

Item Test
Method
Percent
Removed by decantation (dirt, silt, etc.) ASTM C 117 3
Shale or chert ASTM C 295 1
Clay lumps ASTM C 142 1

3. Except as otherwise specified, grade fine aggregate from coarse to fine in accordance with requirements of ASTM C 33.

C. Coarse Aggregate

1. General: Provide coarse aggregate consisting of gravel or crushed stone made up of clean, hard, durable particles free from calcareous coatings, organic matter, or other foreign substances.

2. Weight: Not exceeding 15 percent, for thin or elongated pieces having length greater than 5 times average thickness.

3. Deleterious Substances: Not in excess of following percentages by weight, and in no case having total of all deleterious substances exceeding 2 percent.

Item Test Method Percent
Shale or chert ASTM C 295 1
Coal and lignite ASTM C 123 1/4
Clay lumps and friable particles ASTM C 142 1/4
Materials finer than Number 200 sieve ASTM C 117 1/2*
* Except when material finer than Number 200 sieve consists of crusher dust, maximum amount shall be 1 percent.

15.b
Packet Pg. 642 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-10

4. Grading
a. Aggregate: As specified in ASTM C 33, Size Number 57, except as otherwise specified or authorized in writing by the Engineer. b. Aggregate for Class CE Concrete for Encasement of Electrical Conduits:
1) Graded as specified in ASTM C 33, Size Number 8.
2) Provide concrete utilizing this aggregate equal to Class C concrete in all other respects, and is designated as
Class CE.

D. Portland Cement

1. General: Conform to specifications and tests for ASTM C 150, Types II, sulfate resisting Type V, Low Alkali, except as specified otherwise.

2. Low Alkali Portland: Have total alkali containing not more than

0.60 percent.

3. Exposed Concrete in Any Individual Structure: Use only one brand of Portland cement.

4. Cement for Finishes: Provide cement from same source and of same type as concrete to be finished.

E. Admixtures

1. General
a. Do not use admixtures of any type, except as specified, unless written authorization has been obtained from the Engineer. b. Compatible with concrete and other admixtures.
c. Do not use admixtures containing chlorides calculated as chloride ion in excess of 0.5 percent by weight.
d. Use in accordance with manufacturer's recommendations and add each admixture to concrete mix separately.

2. Air Entraining Admixture
a. Provide all concrete with 5 percent, plus or minus 1 percent, entrained air of evenly dispersed air bubbles at time of placement. b. Conform to ASTM C 260.

3. Fly Ash Admixture
a. Fly Ash
1) Conforming to requirements of ASTM C 618, Class F, may be used as admixture in concrete made with Type II/V
Portland cement.

15.b
Packet Pg. 643 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-11
2) Fly Ash may replace Portland cement at ratio of 1.0 pound fly ash for each pound of Portland cement replaced.
3) Use maximum of 15 percent by weight of minimum
quantities of Portland cement listed in Table A under
paragraph 2.3E may be replaced with Fly Ash.
4) Do not use pozzolan as an admixture in concrete made with Portland-pozzolan cement.
b. Loss on Ignition for Fly Ash: Not exceed four percent.

4. Water Reducing Admixture
a. May be used at the Contractor's option.
b. Conform to ASTM C 494, Type A or Type D.
c. Not contain air entraining agents.
d. Liquid form before adding to the concrete mix.
e. No decrease in cement is permitted as result of use of water reducing admixture.

5. Superplasticizers: Are not to be used without acceptance by the District.

F. Water

1. Water for Concrete, Washing Aggregate, and Curing Concrete: Clean and free from oil and deleterious amounts of alkali, acid, organic matter, or other substances.

2. Chlorides and Sulfate Ions
a. Water for Conventional Reinforced Concrete: Use water not containing more than 1,000 milligrams per liter of chlorides calculated as chloride ion, nor more than 1,000 milligrams per liter of sulfates calculated as sulfate ion.
b. Water for Prestressed or Post-tensioned Concrete: Use water not containing more than 650 milligrams per liter of chlorides calculated as chloride ion, nor more than 800 milligrams per liter of sulfates calculated as sulfate ion.

G. Nonslip Abrasive

1. Type: Aluminum oxide abrasive of size 8/16, having structure of hard aggregate, homogenous, nonglazing, rustproof, and unaffected by freezing, moisture, or cleaning compounds.

2. Manufacturers: One of the following or equal:
a. Exolon Company, Tonawanda, New York.
b. Abrasive Materials, Incorporated, Hillsdale, Michigan.

15.b
Packet Pg. 644 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-12
H. Concrete Sealer: Manufacturers: One of the following or equal:

1. Hillyard Chemical Company, St. Joseph, Missouri, SEAL 341.

2. A. C. Horn, Inc., Horn Clear Seal EM-180.

I. Conduit Encasement Coloring Agent

1. Color: Red color concrete used for encasement of electrical ducts, conduits, similar type items for Class CE concrete.

2. Manufacturers: One of the following or equal.
a. Frank D. Davis Company, Red Oxide Number 1117.
b. I. Reiss Company, Inc., equivalent product.

J. Keyway Material: Steel, plastic, or lumber.

K. Sprayed Membrane Curing Compound: Clear type with fugitive dye conforming to ASTM C 309, Type 1D.

L. Surface Sealant System: Manufacturers: One of the following or equal:

1. Radcon Laboratories, Inc., Las Vegas, Nevada, Formula Number 7.

2. IPA Systems, Philadelphia, Pennsylvania, Duripal.

2.02 EQUIPMENT
A. Mixing Concrete

1. Mixers may be of stationary plant, paver, or truck mixer type.

2. Provide adequate equipment and facilities for accurate measurement and control of materials and for readily changing proportions of material.

3. Mixing Equipment
a. Capable of combining aggregates, cement, and water within specified time into thoroughly mixed and uniform mass and of discharging mixture without segregation.
b. Maintain concrete mixing plant and equipment in good working order and operated at loads, speeds, and timing recommended by manufacturer or as specified.
c. Proportion cement and aggregate by weight.

B. Machine Mixing

1. Batch plant shall be capable of controlling delivery of all material to mixer within 1 percent by weight of individual material.

15.b
Packet Pg. 645 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-13

2. If bulk cement is used, weigh it on separate visible scale which will accurately register scale load at any stage of weighing operation from zero to full capacity.

3. Prevent cement from coming into contact with aggregate or with water until materials are in mixer ready for complete mixing with all mixing water.

4. Procedure of mixing cement with sand or with sand and coarse aggregate for delivery to project site, for final mixing and addition of mixing water will not be permitted.

5. Retempering of concrete will not be permitted.

6. Discharge entire batch before recharging.

7. Volume of Mixed Material Per Batch: Not exceed manufacturer's rated capacity of mixer.

8. Mixers
a. Perform mixing in batch mixers of acceptable type.
b. Equip each mixer with device for accurately measuring and indicating quantity of water entering concrete, and operating mechanism such that leakage will not occur when valves are closed.
c. Equip each mixer with device for automatically measuring, indicating, and controlling time required for mixing.
1) Interlock device to prevent discharge of concrete from mixer before expiration of mixing period.

C. Transit-mixed Concrete

1. Mix and deliver in accordance with ASTM C 94.

2. Total Elapsed Time Between Addition of Water at Batch Plant and Discharging Completed Mix: Not to exceed 90 minutes or elapsed time at project site shall not exceed 30 minutes.

3. Under conditions contributing to quick setting, total elapsed time permitted may be reduced by the District Representative.

4. Equip each truck mixer with device interlocked so as to prevent discharge of concrete from drum before required number of turns and furnish such device that is capable of counting number of revolutions of drum.

5. Continuously revolve drum after it is once started until it has completely discharged its batch.
a. Do not admit water until drum has started revolving.

15.b
Packet Pg. 646 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-14
b. Right is reserved to increase required minimum number of revolutions or to decrease designated maximum number of revolutions allowed, if necessary, to obtain satisfactory mixing.

The Contractor will not be entitled to additional compensation because of such increase or decrease.

D. Other Types of Mixers: In case of other types of mixers, mixing shall be as follows:

1. Mix concrete until there is uniform distribution of materials, and discharge mixer completely before recharging.

2. Neither speed nor volume loading of mixer shall exceed manufacturer's recommendations.

3. Continue mixing for minimum of 1-1/2 minutes after all materials are in drum, and for batches larger than one cubic yard increase minimum mixing time 15 seconds for each additional cubic yard or fraction thereof.

2.03 MIXES
A. Measurements of Materials

1. Measure materials by weighing, except as otherwise specified or where other methods are specifically authorized in writing by the District.

2. Furnish apparatus for weighing aggregates and cement that is suitably designed and constructed for this purpose.

3. Accuracy of Weighing Devices: Furnish devices that have capability of providing successive quantities of individual material that can be measured to within one percent of desired amount of that material.

4. Measuring or Weighing Devices: Subject to review by the District, and bear valid seal of the Sealer of Weights and Measures having jurisdiction.

5. Weighing Cement
a. Weigh cement separately.
b. Cement in Unbroken Standard Packages (Sacks): Need not be weighed.
c. Bulk Cement and Fractional Packages: Weigh such cement.

6. Mixing Water: Measured by volume or by weight.

B. Concrete Proportions and Consistency

1. Concrete Consistency and Composition
a. Provide concrete that can be worked readily into corners and angles of forms and around reinforcement without excessive

15.b
Packet Pg. 647 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-15
vibration and without permitting materials to segregate or free water to collect on surface.
b. Prevent unnecessary or haphazard changes in consistency of concrete.

2. Ratio of Coarse Aggregate to Fine Aggregate: Not less than 1.0 nor more than 2.0 for all concrete Classes, with exception of Class CE.

3. Aggregate: Obtain aggregate from source which is capable of providing uniform quality, moisture content, and grading during any single day's operation.

4. Concrete Mix Water to Cement Ratio, Minimum Cement Content, and Slump Range: Conform to values specified in Table A in this Section.

5. Concrete Batch Weights: Control and adjust so as to secure maximum yield, and at all times maintain proportions of concrete mix within specified limits.

6. Mixture Modification: If required, by the District, modify mixture within limits set forth in this Section.

C. Concrete Mixes

1. Proportioning of Concrete Mix: Proportion mixes on required average on compressive strength f'cr as defined in Subparagraph 2.4.A2.

2. Mixes
a. Adjusting of Water: After acceptance, do not change mixes without acceptance by the District, except that at all times adjust batching of water to compensate for free moisture content of fine aggregate.
b. Total Water Content of Each Concrete Class: Not exceed those specified in Table A in this Section.
c. Checking Moisture Content of Fine Aggregate: Furnish satisfactory means at batching plant for checking moisture content of fine aggregate.

3. Change in Mixes: Undertake new trial batch and test program as specified in this Section.

D. Hand Mixed Concrete

1. Hand mix concrete only when acceptable to the District Representative.

2. Prepare hand mixed concrete on watertight, level platform in batches not to exceed 1/3 cubic yard each.

3. Aggregate

15.b
Packet Pg. 648 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-16
a. First spread required amount of coarse aggregate on platform in an even and uniform layer, and then over such aggregate spread proper proportion of fine aggregate.
b. Combined Depth of Both Such Layers: Not be greater than one foot.

4. Cement
a. First evenly spread required quantity of cement over fine aggregate.
b. Then turn entire batch with shovels at least twice before adding water.

5. Water
a. Then uniformly sprinkle or spray proper amount of water over batched materials.
b. Then turn with shovels not less than three times before being removing from platform.

E. Classes of Concrete

1. Provide concrete consisting of 5 classes, referred herein as Classes A, B, C, D, and CE specified in this Section and use where specified or indicated on the drawings.

2. Weight of Concrete Classes: Provide classes of concrete having minimum weight of 140 pounds per cubic foot.

3. Class B Concrete: Class B concrete may be used at sidewalk.

4. Class C Concrete: Class C concrete may be used for fill for unauthorized excavation, for thrust blocks and ground anchors for piping, for bedding of pipe, and where indicated on the drawings.

5. Class D Concrete: Use Class D for precast concrete items.

6. Class CE Concrete: Use Class CE for electrical conduit encasements.

7. All other concrete, unless specified or otherwise indicated on the drawings: Use Class A concrete.

15.b
Packet Pg. 649 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-17

TABLE A

CONCRETE WITH AIR ENTRAINMENT
Class Specified
Compressive
Strength f'c at
28 Days (Pounds
per Square Inch)
Maximum Net
Water to
Cement Ratio
Minimum Cement
per Cubic Yard of
Concrete by
Weight (Pounds)
Slump
Range
(Inches)
A 4,000 0.45 611 2 to 4*
B 3,000 0.45 517 2 to 4*
C 2,000 0.62 423 3 to 6
D 4,500 0.45 658 2 to 4
CE 2,500 0.62 517 3 to 6
* Note: Slump for slabs, decks, walks, and beams shall be not more than 3-1/2 inches.

8. Pumped Concrete: Provide pumped concrete that complies with all requirements of this Section.

9. Do not place concrete with slump outside limits indicated in Table A.

10. Classes
a. Classes A, B, C, D, and CE Concrete: Make with Type V low alkali cement.
b. Admixtures: Provide admixtures as specified in this Section.

F. Air Entraining Admixture

1. Add agent to batch in portion of mixing water.

2. Batch solution by means of mechanical batcher capable of accurate measurement.

2.04 SOURCE QUALITY CONTROL
A. Tests

1. Concrete Mixes
a. After concrete mixes have been accepted by the District, have trial batches of the accepted Class A, Class B, and Class D concrete mix designs prepared by testing laboratory acceptable to the District.
b. Prepare trial batches by using specified cement and aggregates proposed to be used for the work.
c. Trial Batches: Provide batches of sufficient quantity to determine slump, workability, consistency, and finishing characteristics, and to provide sufficient test cylinders.

15.b
Packet Pg. 650 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-18
d. Test Cylinders: Provide cylinders having six inch diameter by 12 inch length and that are prepared in accordance with ASTM C 31 for tests specified in this Section.
e. Determine slump in accordance with ASTM C 143.
f. Test Cylinders from Trial Batch
1) Test 8 cylinders for compressive strength in accordance with ASTM C 39.
a) Test 4 cylinders at 7 days and 4 at 28 days.
b) Establish ratio between 7 day and 28 day strength
for mix. Seven day strength may be taken as
satisfactory indication of 28 day strength provided
effects on concrete of temperature and humidity
between 7 day and 28 day are taken into account.
2) Average Compressive Strength of 4 Test Cylinders Tested At 28 Days: Equal to or greater than required average
compressive strength f'cr on which concrete mix design is based.
g. Drying Shrinkage
1) Prepare 5 drying shrinkage specimens in accordance with ASTM C 157, except as modified herein.
2) Remove drying shrinkage specimens from molds at age of 23 hours plus or minus 1 hour after trial batching, then immediately place them in water at 73 degrees Fahrenheit plus or minus 3 degrees for at least 30 minutes and then measure specimens within 30 minutes thereafter to
determine original length. Then submerge specimens in
saturated lime water at 73 degrees Fahrenheit plus or
minus three degrees for moist curing.
3) Make measurement to determine expansion expressed as percentage of original length at age 7 days. Use length at age 7 days as base length for drying shrinkage
calculations.
4) Immediately store specimens in humidity controlled room maintained at 73 degrees Fahrenheit plus or minus
3 degrees and 50 percent plus or minus 4 relative humidity for remainder of test.
5) Make and report measurements to determine shrinkage
expressed as percentage of base length separately for 7, 14, 21, and 28 days of drying after 7 days of moist curing. 6) Drying Shrinkage Deformation
a) Measure drying shrinkage deformation of each
specimen as difference between base length and
length after drying at each test age.

15.b
Packet Pg. 651 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-19
b) Measure average drying shrinkage deformation of
specimens to nearest 0.0001 inch at each test age.
c) If drying shrinkage of any specimen departs from
average of test age by more than 0.0004 inch,
disregard results obtained from that specimen and
test another specimen.
d) Shrinkage of trial batch concrete at 28 days drying
age shall not exceed 0.045 percent maximum.
h. If trial batch tests do not meet specified requirements for slump, strength, workability, consistency, drying shrinkage, and finishing, change concrete mix design proportions and, if necessary, source of aggregate. Make additional trial batches and tests until an acceptable trial batch is produced that meets requirements of this Section.
i. Perform test batches and tests required to establish trial batches and acceptability of materials without change in Contract price. g. Do not place concrete until the concrete mix design and trail batch have been accepted by the District.

2. Required Average Compressive Strength
a. Determine required average compressive strength (f'cr) for selection of concrete proportions for mix design, for each class of concrete, using calculated standard deviation and its
corresponding specified compressive strength f'c, in accordance with ACI 318, Part 3, Chapter 5.
b. When test records of at least 30 consecutive tests that span period of not less than 45 calendar days are available, establish standard deviation as described in ACI 318, Part 3, Chapter 5 and as modified as follows herein.
c. Provide test records from which to calculate standard deviation that represent materials, quality control procedures, and conditions similar to materials, quality control procedures, and conditions expected to apply in preparation of concrete for the work.
d. Provide changes in materials and proportions within test records that are more restricted than those for the work.
e. Specified Compressive Strength (f'c) of Concrete Used in Test Records: Within 1,000 pounds per square inch of that specified for the work.
f. When lacking adequate test records for calculation of standard deviation meeting requirements, determine required average compressive strength f'cr from following Table B.

15.b
Packet Pg. 652 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-20

TABLE B
Specified Compressive
Strength f'c
(pounds per square inch)
Required Average
Compressive Strength f'cr
(pounds per square inch)
Less than 3,000 f'c + 1,000
3,000 to 5,000 f'c + 1,200
Over 5,000 f'c + 1,400

3. Pozzolan: Sampling and Testing
a. Sample and test pozzolan in accordance with ASTM C 311. b. In Computing Water to Cement Ratio and Cement Content Per Cubic Yard of Concrete: Consider cement weight to be weight of Portland cement plus 100 percent of weight of fly ash.

4.. Aggregate
a. Testing of concrete aggregate is at Contractor's expense. b Sieves
1) Use sieves with square openings for testing grading of aggregates.
2) Sieve Analyses: If sieve analyses indicate significant change in materials, the District may require that new mix design be submitted and accepted before further placing of concrete.
c. Sample aggregate in accordance with ASTM D 75 and C 136. d. Fine Aggregate
1) Provide fine aggregate not containing strong alkali nor organic matter which gives color darker than standard
color when tested in accordance with ASTM C 40.
2) Provide aggregate having soundness complying with
requirements of ASTM C 33 when tested in accordance
with ASTM C 88.
3) Provide aggregate complying with reactivity requirements of ASTM C 33 when tested in accordance with
ASTM C 289.
e. Coarse Aggregate
1) Soundness when tested in accordance with ASTM C 88:

Have loss not greater than 10 percent when tested with
sodium sulfate.
2) Abrasion Loss: Not exceed 45 percent after
500 revolutions when tested in accordance with
ASTM C 131.

15.b
Packet Pg. 653 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-21
3) Reactivity: Not exceed limits specified in Appendix of ASTM C 33 when tested in accordance with ASTM C 289.
f. Portland Cement: Determination Alkali Content - Determine by method set forth in ASTM C 114.

PART 3 EXECUTION

3.01 INSTALLATION
A. Conduit Encasement Concrete: Mix into each cubic yard of concrete 10 pounds of coloring agent.

B. Surface Sealant System: Apply as recommended by manufacturer published instructions. Where concrete continues to sweat or leak, apply additional coats of surface sealant until the sweating or leaks stop.

C. Joints and Bonding

1. As far as practicable construct concrete work as monolith.

2. Locations of contraction, construction, expansion, and other joints are indicated on the drawings or as specified in this Section.

3. For the Following Structures
a. Larger Structures
1) Provide not less than 7 days between placement of
concrete in adjacent concrete wall placements.
2) Place concrete for slabs in checker board pattern with not less than 14 days between placement of concrete in
adjacent concrete slab placements for slabs more than 3 feet thick.
3) Place concrete for slabs in checker board pattern with not less than 7 days between placement of concrete in
adjacent concrete slab placements for slabs less than 3 feet thick.
b. Tunnels
1) Provide not less than 7 days between placement of
concrete in adjacent concrete wall placements.
2) Place concrete for slabs in checker board pattern with not less than 3 days between placement of concrete in
adjacent concrete slab placements.

4. Construction Joints
a. Where construction joints are not indicated on the drawings, provide slabs and walls with construction joints at intervals not greater than 30 feet.

15.b
Packet Pg. 654 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-22
b. In order to preserve strength and watertightness of structures, make no other joints, except as authorized the District. c. At construction joints, thoroughly clean concrete of laitance, grease, oil, mud, dirt, curing compounds, mortar droppings, or other objectionable matter by means of heavy sandblasting, and wash surfaces just prior to succeeding concrete placement. d. At Horizontal Joints: Immediately prior to resuming concrete placing operations, thoroughly spread bed of grout not less than 1/2 inch in thickness nor more than 1 inch in thickness over horizontal joint surfaces.
e. Dowels in existing concrete: Drill the existing concrete 6-inches minimum and as indicated in the structural detail or District Representative’s direction. To bond dowels to existing concrete, use, Epoxy Hilti HY-150 or RE-500, Redhead Epcon A7 or G5, or equal. Follow the manufacturer installation guide.

5. Keyways in Joints
a. Provide keyways in joints as indicated on the drawings. b. Treat lumber keyway material with form release coating, applied in accordance with manufacturer's instructions.

6. Take special care to ensure that concrete is well consolidated around and against waterstops and that waterstops are secured in proper position.

7. Cleaning of Construction Joints
a. Wash construction joints free of sawdust, chips, and other debris after forms are built and immediately before concrete or grout placement.
b. Should formwork confine sawdust, chips, or other loose matter in such manner that it is impossible to remove them by flushing with water, use vacuum cleaner for their removal, after which flush cleaned surfaces with water.
c. Provide cleanout hole at base of each wall and column for inspection and cleaning.

8. Expansion, Contraction, and Construction Joints
a. Constructed where and as indicated on the drawings.
b. Waterstops, Expansion Joint Material, Synthetic Rubber Sealing Compound, and Other Similar Materials: As specified in
Sections 03290 and 07900.

9. Repair of Concrete: Where it is necessary to repair concrete by bonding mortar or new concrete to concrete which has reached its initial set, first coat surface of set concrete with epoxy bonding agent. If a wide crack is not jeopardizing the integrity of the structural element, then repair using an epoxy resin/PC bonding agent.

15.b
Packet Pg. 655 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-23
D. Conveying and Placing Concrete

1. Convey concrete from mixer to place of final deposit by methods which prevent separation or loss of materials.

2. Use equipment for chuting, pumping, and conveying concrete of such size and design as to ensure practically continuous flow of concrete at delivery end without separation of materials.

3. Design and use chutes and devices for conveying and depositing concrete that direct concrete vertically downward when discharged from chute or conveying device.

4. Keep equipment for conveying concrete thoroughly clean by washing and scraping upon completion of any day's placement.

E. Placing Concrete

1. Place no concrete without prior authorization of the District Representative.

2. Do Not Place Concrete Until
a. Reinforcement is securely and properly fastened in its correct position and loose form ties at construction joints have been retightened.
b. Dowels, bucks, sleeves, hangers, pipes, conduits, bolts, and any other fixtures required to be embedded in concrete have been placed and adequately anchored.
c. Forms have been cleaned and oiled as specified.

3. Placement of concrete in which initial set has occurred, or of retempered concrete, will not be permitted.

4. Place no concrete during rainstorms or high velocity winds.

5. Protect concrete placed immediately before rain to prevent water from coming in contact with such concrete or winds causing excessive drying.

6. Keep sufficient protective covering on hand at all times for protection of concrete.

7. After acceptance, adhere to proposed sequence of placing concrete, except when specific changes are requested and accepted by the District.

8. Notify the District in writing of readiness, not just intention, to place concrete in any portion of the work.
a. Provide this notification in such time in advance of operations as the District deems necessary to make final inspection of preparations at location of proposed concrete placing.

15.b
Packet Pg. 656 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-24
b. Place forms, steel, screeds, anchors, ties, and inserts in place before notification of readiness is given to the District. c. Depositing Concrete
1) Deposit concrete at or near its final position to avoid segregation caused by rehandling or flowing.
2) Do not deposit concrete in large quantities in one place and work along forms with vibrator or by other methods. 3) Do not drop concrete freely into place from height greater than 5 feet.
4) Use tremies for placing concrete where drop is over 5 feet. 5) Commence placement of concrete on slopes, at bottom of slope.

9. Place concrete in approximately horizontal layers not to exceed 24 inches in depth and bring up evenly in all parts of forms.

10. Continue concrete placement without avoidable interruption, in continuous operation, until end of placement is reached.

11. If more than 20 minutes lapse prior to placement of new concrete over concrete previously placed, reduce depth of layers being placed at one time, and/or increase placing equipment, until it is possible to return with placing operation to previously placed concrete within 20 minutes.

12. If concrete is to be placed over previously placed concrete and more than 20 minutes have elapsed, then spread layer of grout not less than 1/2 inch in thickness nor more than 1 inch in thickness over surface before placing additional concrete.

13. Placement of Concrete for Slabs, Beams, or Walkways a. If cast monolithically with walls or columns, do not commence until concrete in walls or columns has been allowed to set and shrink. b. Allow set time of not less than one hour for shrinkage.

F. Consolidating Concrete

1. Place concrete with aid of acceptable mechanical vibrators.

2. Thoroughly consolidate concrete around reinforcement, pipes, or other shapes built into the work.

3. Provide sufficiently intense vibration to cause concrete to flow and settle readily into place and to visibly affect concrete over radius of at least 18 inches.

4. Vibrators

15.b
Packet Pg. 657 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-25
a. Keep sufficient vibrators on hand at all times to vibrate concrete as placed.
b. In addition to vibrators in actual use while concrete is being placed, have on hand minimum 1 spare vibrator in serviceable condition.
c. Place no concrete until it has been ascertained that all vibrating equipment, including spares, are in serviceable condition.

5. Take special care to place concrete solidly against forms so as to leave no voids.

6. Take every precaution to make concrete solid, compact, and smooth, and if for any reason surfaces or interiors have voids or are in any way defective, repair such concrete in manner acceptable to the District.

G. Footings and Slabs on Grade

1. Do not place concrete on ground or compacted fill until subgrade is in moist condition acceptable to the District.

2. If necessary, sprinkle subgrade with water not less than 6 nor more than 20 hours in advance of placing concrete.

3. If it becomes dry prior to actual placing of concrete, sprinkle again, without forming pools of water.

4. Place no concrete if subgrade is muddy or soft.

H. Loading Concrete

1. Green Concrete
a. No heavy loading of green concrete will be permitted. b. Green concrete is defined as concrete with less than 100 percent of the specified strength.

2. No backfill shall be placed against concrete walls until the concrete has reached the specified strength and the connecting slabs and beams have been cast and have reached the specified strength.

3. Use construction methods, sequencing, and allow time for concrete to reach adequate strength to prevent overstress of the concrete structure during construction.

I. Curing Concrete

1. General
a. Cure concrete by methods specified in this Section.
b. Cure concrete minimum of 7 days.

15.b
Packet Pg. 658 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-26
c. Cure concrete to be painted with water or plastic membrane. d. Do not use curing compound on concrete surfaces that are to receive paint or upon which any material is to be bonded. e. Water cure or plastic membrane cure concrete slabs which are specified to be sealed by concrete sealer.
f. Cure other concrete by water curing or sprayed curing membrane at the Contractor's option.
g. Floor slabs may be cured using plastic membrane curing.

2. Water Curing
a. Keep surfaces of concrete being water cured constantly and visibly moist day and night for period of not less than 7 days. b. Each day forms remain in place may count as 1 day of water curing.
c. No further curing credit will be allowed for forms in place after contact has once been broken between concrete surface and forms.
d. Do not loosen form ties during period when concrete is being cured by leaving forms in place.
e. Flood top of walls with water at least 3 times per day, and keep concrete surfaces moist at all times during 7 day curing period.

3. Sprayed Membrane Curing
a. Apply curing compound to concrete surface after repairing and patching, and within 1 hour after forms are removed.
b. If more than 1 hour elapses after removal of forms, do not use membrane curing compound, but apply water curing for full curing period.
c. If surface requires repairing or painting, water cure such concrete surfaces.
d. Curing Compound
1) Do not remove curing compound from concrete in less
than 7 days.
2) Curing compound may be removed only upon written
request by the Contractor and acceptance by the District, stating what measures are to be performed to adequately cure structures.
3) Take care to apply curing compound in area of
construction joints to see that curing compound is placed within construction joint silhouette.
4) Remove curing compound placed within construction joint silhouette by heavy sandblasting prior to placing any new concrete.

15.b
Packet Pg. 659 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-27
5) Contractor's Option: Instead of using curing compound for curing of construction joints such joints may be water
cured.
6) Apply curing compound by mechanical, power operated
sprayer and mechanical agitator that will uniformly mix all pigment and compound.
7) Apply compound in at least 2 coats.
8) Apply each coat in direction 90 degrees to preceding coat. 9) Apply compound in sufficient quantity so that concrete has uniform appearance and that natural color is effectively and completely concealed at time of spraying.
10) Continue to coat and recoat surfaces until specified coverage is achieved and until coating film remains on
concrete surfaces.
11) Thickness and Coverage of Compound: Provide
compound having film thickness that can be scraped from surfaces at any and all points after drying for at least 24 hours.
12) The Contractor is cautioned that method of applying curing compound specified herein may require more compound
than normally suggested by manufacturer of compound
and also more than is customary in the trade.
e. Apply amounts specified herein, regardless of manufacturer's recommendations or customary practice, if curing compound is used in place of water curing.
1) If the Contractor desires to use curing compound other than specified compound, coat sample areas of concrete
wall with proposed compound and also similar adjacent
area with specified compound in specified manner for
comparison.
f. If proposed sample is not equal or better, in opinion of the District, in all features, proposed substitution will not be allowed. 1) Prior to final acceptance of the work, remove, by
sandblasting or other acceptable method, any curing
compound on surfaces exposed to view, so that only
natural color of finished concrete is visible uniformly over entire surface.

4. Plastic Membrane Curing
a. Polyethylene film may be used to cure slabs. Seal joints and edges with small sand berm.
b. Install plastic membrane as soon as concrete is finished and can be walked on without damage.

15.b
Packet Pg. 660 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-28
c. Keep concrete moist under plastic membrane.

3.02 CONCRETE FINISHING
A. Edges of Joints

1. Provide joints having edges as indicated on the drawings.

2. Protect wall and slab surfaces at edges against concrete spatter and thoroughly clean upon completion of each placement.

B. Concrete Sealer
1 Floors and Slabs to Receive Sealer: As specified in Division 9.

2. Seal Floors and Slabs at Contractor's Option: All Floor Slabs Except for the following:
a. Those indicated on the drawings to receive seamless Floor surfacing.
b. Any slabs which receive concrete or grout surfacing, in lieu of water or curing compound.

3. Apply Sealant
a. Apply sealant at coverage rate not to exceed 500 square feet per gallon.
b. Apply as soon as slab or floor will bear weight.
c. Sealer
1) Before applying sealer, sweep entire surface clean with very soft bristled brush which will not mark finish.
2) Apply sealer with large, clean, mop type applicator. 3) Paint rollers are not acceptable.
4) Workmen shall wear flat soled shoes which will not mark or scar surface.
5) Do not allow traffic on floors and slabs until sealer has dried and hardened.

3.03 FIELD QUALITY CONTROL
A. Testing of Concrete

1. During progress of construction, the District will have tests made to determine whether the concrete, as being produced, complies with requirements specified.

2. Tests will be performed in accordance with ASTM C 31, ASTM C 39, and ASTM C 172.

15.b
Packet Pg. 661 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-29

3. The District Representative will make and deliver test cylinders to the laboratory and testing expense will be borne by the District.

4. Required Number Cylinders
a. Not less than 3 cylinder specimens, 6 inch diameter by 12 inch long, will be tested for each 150 cubic yards of each class of concrete with minimum of 3 three specimens for each class of concrete placed and not less than 3 specimens for each half day's placement.
b. One cylinder will be broken at 7 days and 2 at 28 days.

5. The Contractor shall:
a. Test slump of concrete using slump cone in accordance with requirements of ASTM C 143.
b. Furnish test equipment.
c. Do not use concrete that does not meet specification requirements in regards to slump, but remove such concrete from project site. d. Test slump at the beginning of each placement, as often as necessary to keep slump within the specified range, and when requested to do so by the District Representative.
e. Make provisions for and furnish concrete for test specimens, and provide manual assistance to the District Representative in preparing said specimens.

B. Assume responsibility for care of and providing of curing conditions for test specimens in accordance with ASTM C 31.

C. Air Entraining Admixture

1. Test percent of entrained air in concrete at beginning of each placement, as often as necessary to keep entrained air within specified range, and when requested to do so by the District Representative.

2. Provide test equipment.

3. Do not use concrete that does not meet specification requirements as to air entrainment and shall remove such concrete from project site.

4. Test air entrainment in concrete in accordance with ASTM C 173.

5. The District Representative may at any time test percent of entrained air in concrete received on project site.

D. Enforcement of Strength Requirement

1. Concrete is expected to reach higher compressive strength than that which is indicated in Table A as specified compressive strength f'c.

15.b
Packet Pg. 662 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-30

2. Strength Level of Concrete: Will be considered acceptable if following conditions are satisfied.
a. Averages of all sets of 3 consecutive strength test results is greater or equal to specified compressive strength f'c. b. No individual strength test (average of 2 cylinders) falls below specified compressive strength f'c by more than 500 pounds per square inch.
c. Whenever one, or both, of 2 conditions stated above is not satisfied, provide additional curing of affected portion followed by cores taken in accordance with ASTM C 42 and ACI 318 and comply with following requirements:
1) If additional curing does not bring average of 3 cores taken in affected area to at least specified compressive strength f'c, designate such concrete in affected area as defective. 2) The District may require the Contractor to strengthen defective concrete by means of additional concrete,
additional reinforcing steel, or replacement of defective concrete, all at the Contractor's expense.

3.04 ADJUSTING
A. Repair of Defective Concrete

1. Remove and replace or repair defective work.

2. Correct defective work as specified in this Article.

3. Do not patch, repair, or cover defective work without inspection by the District Representative.

4. Provide repairs having strength equal to or greater than specified concrete for areas involved. Chip out and key imperfections in the work and make them ready for repair.

5. Dry Pack Method
a. Dry Pack Method: Use for holes having depth nearly equal to or greater than least surface dimension of hole, for cone-bolt, and narrow slots cut for repair.
b. Smooth Holes: Clean and roughen by heavy sandblasting before repair.

6. Mortar Method of Replacement: Use for following:
a. Holes too wide to dry pack and too shallow for concrete replacement.
b. Comparatively shallow depressions, large or small, which extend no deeper than reinforcement nearest surface.

15.b
Packet Pg. 663 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-31

7. Concrete Replacement
a. Use: When holes extend entirely through concrete section or when holes are more than 1 square foot in area and extend halfway or more through the section.
b. Method of Repair for Surfaces of Set Concrete to be Repaired:

First coat with epoxy bonding agent.

8. Acceptable Method of Concrete Repair: Make no repair until the District has accepted method of preparing surfaces and proposed method of repair.

END OF SECTION

15.b
Packet Pg. 664 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CAST-IN-PLACE CONCRETE
CHLORINE CONVERSION PROJECT 03300-32
This Page Intentionally Left Blank

15.b
Packet Pg. 665 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO GROUTS
CHLORINE CONVERSION PROJECT 03600-1
SECTION 03600
GROUTS
PART 1 GENERAL

1.01 DESCRIPTION
A. The Contractor shall furnish labor and materials to install concrete mortar, grout, dry-pack mortar, non-shrink grout, epoxy grout, and non-shrink epoxy grout.

1.02. REFERENCES
A. American Society for Testing and Materials (ASTM)

1. C 109 - Test Method for Compressive Strength of Hydraulic Cement Mortars (using 2 inch or 50 millimeter cube specimens).

2. C 531 - Test Method for Liner Shrinkage and Coefficient of Thermal Expansion of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes.

3. C 579 - Test Method for Compressive Strength of Chemical-Resistant Mortars and Monolithic Surfacings.

4. C 827 - Test Method for Change in Height at Early Ages of Cylindrical Specimens from Cementitious Mixtures.

5. C 939 - Test Method for Flow of Grout for Preplaced-Aggregate Concrete (Flow Cone Method).

6. C 1090 - Test Method for Measuring Change in Height of Cylindrical Specimens from Hydraulic-Cement Grout.

7. C 1107 - Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink).

8. C 1181 - Test Methods for Compressive Creep of Chemical-Resistant Polymer Machinery Grouts.

1.03 SUBMITTALS
A. Submittals shall be in accordance with General Conditions, Article 9 and Special Conditions, Article 9.

B. Product Data Submittals: Submit manufacturer’s data completely describing nonshrink grout.

C. Quality Control Submittals: Manufacturer’s installation instructions and certified test data.

15.b
Packet Pg. 666 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO GROUTS
CHLORINE CONVERSION PROJECT 03600-2

1.04 DELIVERY, STORAGE, AND HANDLING
A. All materials shall be delivered to the jobsite in their original, unopened packages or containers, clearly labeled with the manufacturer's product identification and printed instructions.

B. All materials shall be stored in a cool dry place and in accordance with the manufacturer's recommendations.

C. All materials shall be handled in accordance with the manufacturer's instructions.

1.05 PROJECT/SITE CONDITIONS
A. Refer to manufacturer's literature or contact the manufacturer for any special physical or environmental limitations that may be required for use of products.

1.06 WARRANTIES
A. Non-shrink Grout: The manufacturer shall warranty that the non-shrink grout will never go below its initial placement volume when tested in accordance with ASTM C 1107.

B. Non-shrink Epoxy Grout: The manufacturer shall warranty that non-shrink epoxy grout will show negligible shrinkage or expansion when tested in accordance with ASTM C 531.

PART 2 PRODUCTS

2.01 MATERIALS
A. Concrete Mortar

1. General: Consist of concrete mixture with coarse aggregate removed and water quantity adjusted as required.

2. At Exposed Concrete Surfaces Not to Be Painted or Submerged in Water:

White cement.

B. Grout: Consist of mixture of Portland cement and sand.

C. Dry-pack Mortar: Consist of mixture of Portland cement and sand.

D. Non-shrink Grout

1. Non-shrink grout shall be a preportioned and prepackaged cement-based mixture. It shall contain no metallic particles such as aluminum powder and no metallic aggregate such as iron filings. It shall require only the addition of potable water.

2. Potable water for pre-soaking, mixing, and curing shall be clean and free of oils, acids, alkalies, organics, and any other deleterious matter.

15.b
Packet Pg. 667 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO GROUTS
CHLORINE CONVERSION PROJECT 03600-3

3. Bleeding: Non-shrink grout shall be free from the emergence of mixing water from within or the presence of water on its surface.

4. Non-shrink grout shall be in accordance with ASTM C 1107.

5. Consistency: Non-shrink grout shall remain at a minimum flowable consistency for at least 45 minutes after mixing at 45 degrees Fahrenheit to 90 degrees Fahrenheit when tested in accordance with ASTM C 230. If at a fluid consistency, it shall be verified in accordance with ASTM C 939.

6. Dimensional Stability (height change): Non-shrink grout shall be in accordance with ASTM C 1107, volume-adjusting Grade B or C at 45 degrees to 90 degrees. It shall show 90 percent or greater bearing area under bases or baseplates.

7. Compressive Strength: Non-shrink grout shall show minimum compressive strengths at 45 degrees Fahrenheit to 90 degrees Fahrenheit in accordance with ASTM C 1107 for various periods from the time of placement, including 5,000 pounds per square inch at 28 days when tested in accordance with ASTM C 109 as modified by C 1107.

8. Manufacturers: One of the following or equal:
a. Five Star Products, Inc., Five Star Grout.
b. Master Builders, Inc., Masterflow 928.
c. L&M Construction Chemicals, Inc., CRYSTEX.

E. Epoxy Grout

1. Consist of mixture of epoxy and sand.

2. Sand: Clean, bagged, graded, and kiln dried silica sand.

F. Non-shrink Epoxy Grout

1. Non-shrink epoxy grout shall be a 100 percent solids, premeasured, prepackaged system containing a two-component thermosetting epoxy resin and inert aggregate.

2. Consistency: Non-shrink epoxy grout shall maintain a flowable consistency for at least 45 minutes at 70 degrees Fahrenheit.

3. Dimensional Stability (Height Change)
a. Non-shrink epoxy grout shall have negligible shrinkage or expansion (less than 0.0006 in/in) when tested in accordance with ASTM C 531.
b. Compressive Strength: Non-shrink epoxy grout shall show a minimum compressive strength of 10,000 pounds per square inch at 24 hours and 14,000 pounds per square inch at 7 days when tested in accordance with ASTM C 579, Method B.

15.b
Packet Pg. 668 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO GROUTS
CHLORINE CONVERSION PROJECT 03600-4
c. Compressive Creep: The compressive creep for non-shrink epoxy grout shall not exceed 0.0027 in/in when tested under a 400 pounds per square inch constant load at 140 degrees Fahrenheit in accordance with ASTM C 1181.

4. Thermal Capability: The coefficient of thermal expansion for non-shrink epoxy grout shall not exceed 0.000018 inches per inch per degree Fahrenheit when tested under ASTM C 531, Method B.

5. Manufacturers: One of the following or equal:
a. Five Star Products, Inc., Five Star Epoxy Grout.
b. Master Builders, Inc., Ceilcote 648 CP Plus.
c. L&M Construction Chemicals, Inc., EPOGROUT.

2.02 MIXES
A. Concrete Mortar Mix

1. Use water-cement ratio that is no more than that specified for concrete being repaired.

2. At Exposed Concrete Surfaces Not To Be Painted Or Submerged In Water:

Use sufficient white cement to make color of finished patch match that of surrounding concrete.

B. Grout Mix

1. For Concrete Repair: Mix in same proportions used for concrete being repaired, with only sufficient water to give required consistency for spreading.

2. For Spreading over the Surfaces of Construction or Cold Joints: Mix with no more water used than allowed by water-cement ratio specified for concrete.

3. For grout not specified in subparagraph 2.2B1 or 2.2B2, mix in proportions by weight of one part cement to four parts of concrete sand.

C. Dry-pack Mortar Mix: Use only enough water so that resulting mortar will crumble to touch after being formed into ball by hand.

D. Non-shrink Grout: Mix in accordance with manufacturer's installation instructions such that resulting mix has fluid or flowable consistency and is suitable for placing by pouring.

E. Epoxy Grout

1. Mix in accordance with manufacturer's installation instructions for mixing.

2. Proportioning

15.b
Packet Pg. 669 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO GROUTS
CHLORINE CONVERSION PROJECT 03600-5
a. For horizontal work, consist of mixture of one part epoxy with not more than 2 parts sand.
b. For vertical or overhead work, consist of 1 part epoxy gel with not more than 2 parts sand.

F. Non-shrink Epoxy Grout: Mix in accordance with manufacturer's installation instructions.

PART 3 EXECUTION

3.01 EXAMINATION
A. Inspect concrete surfaces to receive grout or mortar and verify that they are free of ice, frost, dirt, grease, oil, curing compounds, paints, impregnations and all loose material or foreign matter likely to affect the bond or performance of grout or mortar.

B. Inspect baseplate and anchor systems for rust, oil, and other deleterious substances that may affect the bond or performance of grout.

C. Confirm that newly placed concrete has been cured sufficiently to attain its design strength and limit further shrinkage.

D. Verify that temperature of cementitious or epoxy grout does not exceed manufacturer's recommendations.

3.02 PREPARATION
A. Surface Preparation

1. Roughen all concrete surfaces by heavy sandblasting, chipping, or other mechanical means to assure bond. Loose or broken concrete shall be removed.

2. All grease, oil, dirt, curing compounds, laitance, and other deleterious materials that may affect bond that were identified in the inspection process shall be completely removed from concrete and bottoms of baseplates. All metal surfaces should have a 2 to 3 mil peak-to-valley profile for epoxy grouts.

3. For cementitious mortars and grouts, concrete surfaces shall be saturated surface dry. Any standing water shall be removed prior to placing grouts.

4. For epoxy grouts, do not wet concrete surfaces with water. Instead, where required, wet surfaces with epoxy for horizontal work or epoxy gel for vertical or overhead work prior to placing epoxy grouts.

B. Forms and Headboxes for Grouts (Cementitious or Epoxy)

1. Forms for grouts shall be built of material with adequate strength to withstand the placement of grouts.

15.b
Packet Pg. 670 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO GROUTS
CHLORINE CONVERSION PROJECT 03600-6

2. Forms must be rigid and liquid tight. All cracks and joints shall be caulked with an elastomeric sealant. All forms shall be lined with polyethylene for easy grout release. Forms carefully waxed with two coats of heavy-duty paste wax shall also be acceptable.

3. Forms shall be 4 to 6 inches higher than the baseplate on one side of the baseplate configuration when using head pressure for placement.

4. A sufficient number of headboxes shall be built to facilitate placement of grouts.

5. Air relief holes a minimum 1/8 inch in diameter shall be provided when required by a baseplate configuration to avoid entrapping air underneath.

3.03 APPLICATION
A. Cement Mortar and Grout

1. For Defective Concrete Repair
a. Filling: Filling of voids around items through the concrete. b. Grout Spreading: Spread over construction joints, cold joints, and similar type items.

2. Concrete Surfaces: Apply epoxy bonding agent to clean, roughened, and dry surfaces before placing mortar or grout.

3. Placing
a. Exercise particular care in placing portland cement mortar or grout since they are required to furnish structural strength or impermeable water seal or both.
b. Do not use cement mortar or grout that has not been placed within 30 minutes after mixing.

B. Epoxy Grout

1. Apply in accordance with manufacturer's installation instructions.

2. Use where specified herein or where indicated on the drawings.

3.04 PLACEMENT
A. The Contractor shall make arrangements to have a grout manufacturer's representative present for a pre-construction meeting and during initial grout placement. Grout shall only be installed after the final equipment alignment is correct and accepted by the Engineer.

1. Grouts shall be mixed in accordance with the manufacturer's recommendations.

15.b
Packet Pg. 671 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO GROUTS
CHLORINE CONVERSION PROJECT 03600-7

2. A mortar mixer with moving paddles shall be used for mixing grouts. For cementitious grouts, pre-wet the mixer and empty out excess water before beginning mixing.

3. Cementitious Grouts
a. Non-shrink cementitious grout shall be added to a premeasured amount of water that does not exceed the manufacturer's maximum recommended water content.
b. Mix cementitious grouts per manufacturer's instructions for uniform consistency.
c. Grouts may be drypacked, flowed, or pumped into place. All baseplate grouting shall take place from one side of a baseplate to the other to avoid trapping air. Do not overwork grouts. d. Do not retemper grout by adding more water after stiffening. e. Hydrostatic head pressure shall be maintained by keeping the level of the grout in the headbox above the bottom of the baseplate. The headbox should be filled to the maximum level and the grout worked down to top of baseplate.

4. Epoxy Grouts
a. Epoxy grouts shall be mixed in complete units. Do not vary the ratio of components or add solvent to change the consistency of the mix. b. Pour the hardener into the resin and mix for at least one minute and until each mixture is uniform in color. Pour the chemical components into the mortar mixer wheelbarrow and add the aggregate. Mix until aggregate is uniformly wetted. Overmixing will cause air entrapment in the mix.
c. All epoxy grout shall be flowed into place using a headbox. All grouting shall take place from one side of a baseplate to the other in a continuous flow to avoid trapping air.
d. Hydrostatic head pressure shall be maintained by keeping the level of grout in headboxes above the bottom of baseplates. Headboxes shall be filled to the maximum level and grout worked down to the bottom of baseplates.
e. Epoxy grouts shall not be cut back after setting. The final level of grout will be as installed with all chamfer edges built into the formwork.

3.05 CURING
A. Cementitious Grouts

1. Grouts must be cut back to the lower edge of baseplates after reaching initial set. Provide a 45 degree angle cut back.

15.b
Packet Pg. 672 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO GROUTS
CHLORINE CONVERSION PROJECT 03600-8

2. Clean equipment and tools as recommended by the grout manufacturer.

3. Cure Grouts in accordance with manufacturer's specifications and recommendations. Keep grout moist for a minimum of 3 days. The method needed to protect grouts will depend on temperature, humidity, and wind.

Wet burlap, a soaker hose, sun shading, ponding and, in extreme conditions, a combination of methods shall be employed.

4. Grouts shall be maintained above 40 degrees Fahrenheit until they have attained a compressive strength of 3,000 pounds per square inch or above 70 degrees Fahrenheit for a minimum of 24 hours to avoid damage from subsequent freezing.

B. Epoxy Grouts

1. Cure grouts in accordance with manufacturers' specifications and recommendations. Do not wet cure epoxy grouts.

2. Consult the manufacturer for appropriate cure schedule. In no case should any surface in contact with grout be allowed to fall below 50 degrees Fahrenheit for a minimum of 48 hours after placement.

3. Equipment and tools shall be cleaned immediately with a strong liquid detergent and water solution before grout hardens.

3.06 FIELD QUALITY CONTROL
A. Non-shrink cementitious grouts shall be tested for 24-hour compressive strength in accordance with ASTM C 109.

B. Non-shrink grouts shall be tested for 24-hour compressive strength in accordance with ASTM C 579 (Method B).

END OF SECTION

15.b
Packet Pg. 673 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO STRUCTURAL STEEL
CHLORINE CONVERSION PROJECT 05120-1
SECTION 05120

STRUCTURAL STEEL
PART 1 GENERAL

1.01 THE REQUIREMENT
A. The Contractor shall furnish, fabricate, and install, the structural steel framing and all appurtenant metal parts required for permanent connection of the structural steel, complete, all in accordance with the requirements of the Contract Documents.

B. Structural members such as wide flange beams, I-beams, channels or angles which are non-standard or not available in the type and size specified shall be fabricated by welding flat plates of the specified material in accordance with the latest edition of the Uniform Building Code, or by folding plates of the required type of material. Fabricated members shall have the same section modulus and moment of inertia as the sections specified. Design of the fabricated member shall be based on the capacity of the specified member and shall conform to the latest edition of the Specifications of the (AISC) American Institute of Steel Construction.

C. The design of fabricated members shall be submitted to the District prior to submittals and fabrication.

1.02. RELATED WORK SPECIFIED ELSEWHERE
A. Grouts:03600
B. Miscellaneous Metal:05500

1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. Comply with the reference specifications of the General Requirements.

B. Commercial Standards

1. AISC - Code of Standard Practice for Steel Buildings and Bridges

2. AISC - Specifications for the Design, Fabrication, and Erection of Structural Steel for Buildings" and including the "Commentary of the AISC Specification

3. AISC - Specifications for Structural Joints Using ASTM A325 or A490 Bolts approved by the Research Council of Riveted and Bolted Structural Joints of the Engineering Foundation

4. AISC - Structural Welding Code AWS D1.1-96 and "Standard Qualification Procedure
C. Commercial Standards

15.b
Packet Pg. 674 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO STRUCTURAL STEEL
CHLORINE CONVERSION PROJECT 05120-2

1. AISC - Code of Standard Practice for Steel Buildings and Bridges

2. AISC - Specifications for the Design, Fabrication, and Erection of Structural Steel for Buildings and including the Commentary of the AISC Specification

3. AISC - Specifications for Structural Joints Using ASTM A325 or A490 Bolts approved by the Research Council of Riveted and Bolted Structural Joints of the Engineering Foundation

4. AISC - Structural Welding Code AWS D1.1-96 and "Standard Qualification Procedure

5. ASTM A 36 - Standard Specification for Carbon Structural Steel

6. ASTM A992 – Standard Specification for Structural Steel

7. ASTM A 53 - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

8. ASTM A 123 - Standard Specification for Zinc Coating (Hot-Dip Galvanized) Coatings on Iron and Steel Products

9. ASTM A 153 - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

10. ASTM A 193 - Standard Specification for alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service

11. ASTM A 194 - Standard Specification for Carbon and Alloy Steel Nuts for Bolts for High Pressure and High Temperature Service

12. ASTM A 307 - Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength

13. ASTM A 325 - Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength

14. ASTM A 490 - Standard Specification for Structural Bolts, Steel, 150 ksi Minimum Tensile Strength

15. ASTM A 500 - Standard Specification for Cold-formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

16. ASTM A 501 - Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing
D. References herein to "Building Code" shall mean the California Building Code (CBC), latest edition.

15.b
Packet Pg. 675 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO STRUCTURAL STEEL
CHLORINE CONVERSION PROJECT 05120-3

1.04 CONTRACTOR SUBMITTALS
A. Submittals shall be made in accordance with the General Requirements.

B. Shop drawings shall conform to AISC recommendations and specifications and shall show all holes, etc. required for other work. Drawings shall include complete details showing all members and their connections, anchor bolt layouts, field welds, schedules for fabrication procedures, and diagrams showing the sequence of erection.

C. Certified alloy test reports shall be furnished for all materials specified herein, as requested by the District.

D. Welder certifications shall be submitted for shop and field welders in triplicate, directly to the District from a recognized testing laboratory, with copies to the Contractor and others as required.

1.05 QUALITY ASSURANCE
A. Shop inspection may be required by the District at the District’s own expense. The Contractor shall give ample notice to the District prior to the beginning of any fabrication work so that inspection may be provided. The Contractor shall furnish all facilities for the inspection of materials and workmanship in the shop and inspectors shall be allowed free access to the necessary parts of the work.

Inspectors shall have the authority to reject any materials or work not meeting the requirements of these Specifications. Inspection at the shop is intended as a means of facilitating the work and avoiding errors, but it is expressly understood that it will in no way relieve the Contractor from its responsibility for furnishing proper materials or workmanship under this Specification.

B. The District may engage inspectors to inspect high strength bolted connections and welded connections and to perform tests and prepare test reports.

1. High-strength bolts shall be inspected using one of the procedures set forth in the current AISC Specification for Structural Joints Using ASTM A325 or A490 Bolts.

2. Ten percent of all butt and bevel welds which extend continuously for 24 inches or less shall be completely tested in accordance with AWS D1.1-96, Part B, Radiographic Testing of Welds, Chapter 6. All butt and bevel welds which extend continuously for more than 24 inches shall be spot tested at intervals not exceeding 36 inches.

3. Welds that are required by the District to be corrected shall be corrected or redone and retested as directed, at the Contractor's expense, and to the satisfaction of the District and/or approved independent testing lab.

15.b
Packet Pg. 676 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO STRUCTURAL STEEL
CHLORINE CONVERSION PROJECT 05120-4
PART 2 PRODUCTS

2.01 MATERIALS
A. All structural steel shapes, plates, bars, rods and their products shall be ASTM A992 unless otherwise shown.

B. All steel shall be delivered clean and free from mill scale, rust or pitting.

C. Certified copies of mill test reports shall be furnished to the District when requested.

D. Structural steel pipe shall be ASTM A501, or ASTM A53, Type E or S, Grade B.

E. Structural tubing shall be ASTM A500, Grade B with Fy = 46 ksi.

F. Bolts shall have hexagonal heads and nuts. Threads shall be clean cut of American Standard size.

G. High strength bolts for structural framing connections shall be ASTM A325 or A490; use A325 unless otherwise shown. Bolts used to connect dissimilar metals shall be ASTM A193, Type 316 stainless steel.

H. Nuts shall be compatible with, and have the same finish as, the attached bolt and shall be ASTM A563, Grade DH or ASTM A194.

I. All bolts, nuts, studs and fasteners exposed to water, groundwater, sewage, sewer gas or enclosed areas above sewage shall be Type 316 stainless steel.

J. Steel bolts, nuts, washers, studs and fasteners for general use shall conform to ASTM A 307 and shall be hot-dip galvanized per ASTM A 153.

K. A hardened flat washer shall be provided under the nut or bolt head turned in tightening. Hardened flat washers shall be provided under the bolt head and nut for bolts in slotted holes.

L. All bolts, nuts, washers, and fasteners used in contact with aluminum shall be Type 304 or Type 316 stainless steel.

M. Bolts required to be bent shall be bent cold. The bend radius shall not be less than twice the bolt diameter.

N. Welded anchor studs shall be headed concrete anchor studs (HAS), deformed bar anchors (DBA), or threaded anchor studs (TAS) as indicated on the drawings and as supplied by Nelson Stud Welding Company, Lorain, OH; Omark Industries, KSM Fastening Systems Division, Seattle, WA; or equal.

O. Structural steel shall be cleaned, sharp edges and corners removed, and coated with a shop paint primer; except, that primer shall be omitted for surfaces to be galvanized or embedded in concrete with no further coating.

P. Material to be galvanized shall have no corner with a radius of less than 1/16 inch.

15.b
Packet Pg. 677 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO STRUCTURAL STEEL
CHLORINE CONVERSION PROJECT 05120-5
Q. All structural members shall be furnished full length without splices unless otherwise noted or approved by the District.

PART 3 EXECUTION

3.01 GENERAL
A. The Contractor shall furnish and install all steel and miscellaneous ferrous metal items as shown on the Contract Documents. All fabrication and erection of steel items shall conform to AISC "Specification for the Design, Fabrication, and Erection of Structural Steel for Buildings", wherever applicable, unless otherwise noted. The Contractor shall take all measurements necessary to properly fit the work in the field.

3.02 MEASUREMENT
A. The Contractor shall verify all dimensions and shall make any field measurements necessary and shall be fully responsible for accuracy and layout of work. The Contractor shall review the drawings and any discrepancies shall be reported to the District for clarification prior to starting fabrication.

3.03 FABRICATION
A. Fabricate items of structural steel in accordance with the drawings, AISC Specifications, and as indicated on the final reviewed shop drawings.

B. All steel and miscellaneous ferrous metal items shall be carefully fabricated to true dimensions without warp or twist.

C. Properly mark and matchmark materials for field assembly.

D. Where finishing is required, complete the assembly, including bolting and welding of units, before start of finishing operations.

3.04 CONNECTIONS
A. Weld or bolt shop connections as shown unless otherwise noted. Bolt field connections, except where welded connections or other connections are shown or specified. All connections unless shown otherwise shall develop full strength of members joined and shall conform to AISC standard connections.

3.05 WELDED CONSTRUCTION
A. All welding shall comply with the current AWS D1.1-96 Code for procedures, appearance, and quality of welds and welders, and methods used in correcting welding work.

B. Welders, welding operations and tackers shall be prequalified in accordance with the specifications of AWS D1.1-96 and shall produce written evidence of qualification satisfactory to the District. All costs associated with qualification of welders shall be borne by the Contractor.

15.b
Packet Pg. 678 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO STRUCTURAL STEEL
CHLORINE CONVERSION PROJECT 05120-6
C. Welding procedures shall be submitted for approval to the District prior to the beginning of construction. Certification that welding procedures, welders and welding operators that the Contractor intends to use meet the ASME requirements shall also be submitted to the District prior to the beginning of construction. Any welding not traceable to the welder performing the work shall be cause for rejection by the District. The District shall be notified of any weld repairs and proposed repair procedures.

D. Sharp or hazardous obstructions shall be rounded off and ground smooth. Welded closures shall be neatly made; and where weld material interferes with fit, or is unsightly in appearance, it shall be ground off smooth.

E. Unless otherwise shown, all butt and bevel welds shall be complete penetration.

F. Inspection

1. The Contractor shall notify the District at least 24 hours before starting any shop or field welding. Welds shall be inspected by radiographic or other means. Welds found not in accordance with this Specification shall be repaired or replaced at the Contractor’s expense. The new weld shall be inspected and an additional 2 welds selected at random shall be reinspected.

2. Welders found performing unsatisfactory work shall be removed from the welding process.

3. All costs associated with testing and inspection, unless specified otherwise on the Contract Documents, shall be borne by the Contractor.

3.06 HOLES FOR OTHER WORK
A. Provide holes as necessary or as indicated for securing other work to structural steel framing, and for the passage of other work through steel framing members.

Provide threaded nuts welded to framing, and other specialty items as shown to receive other work. No torch cut holes are permitted.

3.07 GALVANIZING
A. Galvanized steel or iron shall be hot-dip galvanized after fabrication and shall conform to ASTM A 123.

B. Areas of galvanizing damaged by welding or burning or otherwise damaged shall be by thoroughly cleaned, sandblasted and coated to a thickness equal to the galvanized coating using method approved by District, or equal.

3.08 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. Load structural members in such a manner that they may be transported and unloaded without being excessively stressed, deformed, or otherwise damaged.

B. Protect structural steel members and packaged materials from corrosion and

15.b
Packet Pg. 679 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO STRUCTURAL STEEL
CHLORINE CONVERSION PROJECT 05120-7
deterioration. Material shall be stored in a dry area and shall not be placed in direct contact with the ground. Do not place materials on the structure in a manner that might cause distortion or damage to the members or the supporting structures.

Repair or replace damaged materials or structures as directed.

3.09 ERECTION
A. The Contractor shall comply with the AISC Specifications and Code of Standard Practice, and with specified requirements.

B. High-strength bolts shall be installed in accordance with the AISC Specification for Structural Joints using ASTM A325 or ASTM A490 Bolts. The connections shall be the bearing type with threads excluded from the shear plane unless noted otherwise.

C. Anchor bolts and other connectors required for securing structural steel to in-place work, and templates and other devices for presetting bolts and other anchors to accurate locations shall be furnished.

3.10 SETTING BASES AND BEARING PLATES
A. Prior to the placement of non-shrink grout beneath base and bearing plates, the bottom surface of the plates shall be cleaned of all bond-reducing materials, and concrete and masonry bearing surfaces shall also be cleaned of all bond-reducing materials and roughened to improve bonding.

B. Set loose and attached baseplates and bearing plates for structural members on wedges, leveling nuts, or other adjustable devices.

C. Tighten the anchor bolts after the supported members have been positioned and plumbed.

D. Grouting of baseplates shall be as specified in Section 03600, Grouts. Grouting shall be completed prior to placing loads on the structure.

3.11 FIELD ASSEMBLY
A. Set structural frames accurately to the lines and elevations indicated. Align and adjust the various members to form a part of a complete frame or structure before permanently fastening. Clean bearing surfaces and other surfaces which will be in permanent contact before assembly. Perform necessary adjustments to compensate for discrepancies in elevations and alignment.

B. Level and plumb individual members of the structure within specified AISC tolerances. Contractor shall provide and install all temporary bracing necessary to carry construction loads until the structure has been completed.

C. Establish required leveling and plumbing measurements at the main operating temperature of the structure.

15.b
Packet Pg. 680 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO STRUCTURAL STEEL
CHLORINE CONVERSION PROJECT 05120-8

3.12 MISFITS AT BOLTED CONNECTIONS
A. Where misfits in erection bolting are encountered, the Contractor shall immediately notify the District. The Contractor shall submit a method to remedy the misfit for review by the District. The District will determine whether the remedy is acceptable or if the members must be refabricated. Methods of remedy may include, but are not limited to, the following:

1. Ream holes that must be enlarged to admit bolts and use oversized bolts.

2. Plug-weld misaligned holes and redrill holes to admit standard size bolts.

3. Drill additional holes in the connection, conforming with AISC Standards for bolt spacing and end and edge distances, and add additional bolts.

4. Reject the improperly fabricated member and fabricate a new member to ensure proper fit.

B. Mis-sized or misaligned holes in members shall not be enlarged by burning or by the use of drift pins.

C. Fabricated items shall not be cocked out of alignment, redrilled, reshaped or force fit.

3.13 MISFITS AT ANCHOR BOLTS
A. Where misalignment between anchor bolts and bolt holes in steel members are encountered, the District shall be immediately notified. The Contractor shall submit a method to remedy the misalignment for review by the District.

B. It is the Contractor's sole responsibility to place anchor bolts or other anchoring devices accurately and to make any surfaces which bear against structural items smooth and true to level to preclude the necessity of any springing, redrilling or reshaping.

3.14 GAS CUTTING
A. Do not use gas cutting torches in the field for correcting fabrication errors in the structural framing, except on secondary members which are not under stress and will be concealed in the finished structure and when approved by the District.

Finish gas-cut sections equal to a sheared appearance.

3.15 TOUCHUP COATING
A. Immediately after erection, clean field welds, bolted connections, and abraded areas of the shop paint primer. Apply touchup paint primer by brush or spray, which is the same thickness and material as that used for the shop paint.

Galvanized surfaces which have been field welded or damaged shall be repaired as specified in Section 3.7,G. Coating and Galvanizing, above.

END OF SECTION

15.b
Packet Pg. 681 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MISCELLANEOUS METALS
CHLORINE CONVERSION PROJECT 05500-1
SECTION 05500

MISCELLANEOUS METALS
PART 1 GENERAL

1.01 WORK OF THIS SECTION
A. The Contractor shall provide miscellaneous metals and appurtenances, complete, in accordance with the Contract Documents.

B. Work Included in this Section. Principal items are:

1. Bolts for framing connections

2. Welding electrodes

3. Pipe supports with saddles, hangers, bracing and attachments as detailed and required, except as provided by other trades

4. Miscellaneous iron, stainless steel and steel items indicated, specified, or required for completion of the Contract, unless included under other sections

5. Warning signs

6. Galvanizing and shop primer finishes, including field touch-up

1.02 RELATED SECTIONS
A. The work of the following sections applies to the work of this Section. Other, not referenced below, shall also apply to the extent required for proper performance of this work.

1. Cast-in-Place Concrete: 03300

2. Grouts: 03600

3. Adhesive Anchors: 05503

4. Supports, hangers, brackets and other miscellaneous items accessory to mechanical and electrical installations indicated on the Drawings or covered in Division 16.

1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. The current edition of the California Building Code (CBC).

B. Except as otherwise indicated, the current editions of the following commercial standards apply to the work of this Section:

1. Commercial Standards

15.b
Packet Pg. 682 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MISCELLANEOUS METALS
CHLORINE CONVERSION PROJECT 05500-2
AA-M32C22A41 Aluminum Association
AASHTO Standard Specification for Highway Bridges
AISC Specification for Design, Fabrication and Erection of Structural Steel for Buildings with Commentary and Code of Standard Practice for Steel Buildings and Bridges
AWS B2.1 Welding Procedures and Performance Qualifications AWS D1.1 Structural Welding Code - Steel
AWS D1.2 Structural Welding Code - Aluminum
AWS QC1 Standard for AWS Certification of Welding Inspectors NFPA 101 Life Safety Code
NAAMM National Association of Architectural Metal Manufacturers Metal Stairs Manual
AWS D1.6 Structural Welding Code – Stainless Steel

2. ASTM Standards in Building Codes
ASTM A36 Specification for Structural Steel
ASTM A48 Specification for Gray Iron Castings
ASTM A53 Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A123 Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A153 Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware ASTM A167 Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet and Strip
ASTM A193 Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature or High Pressure Service
ASTM A194 Specification for Carbon and Alloy Steel Nuts for Bolts for High Pressure or High-Temperature Service or both
ASTM A276 Specification for Stainless Steel Bars and Shapes ASTM A283 Specification for Low and Intermediate Tensile Strength Carbon Steel Plates
ASTM A307 Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength
ASTM A325 Specification for Structural Bolts, Steel, Heat treated, 120/105 KSI Minimum Tensile Strength
ASTM A424 Specification for Steel, Sheet, for Porcelain Enameling ASTM A500 Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A536 Specification for Ductile Iron Casting
ASTM A563 Specification for Carbon and Alloy Steel Nuts ASTM A1011 Specification for Steel, Sheet and Strip, Hot Rolled, Carbon, Structural, High Strength Low Alloy, High Strength Low Alloy with Improved Formability, and Ultra High Strength
ASTM A575 Specifications for Steel Bars, Carbon, Merchant Quality, M-Grades ASTM A992 Standard Specification for Structural Steel Shapes ASTM B210 Specification for Aluminum and Aluminum-Alloy Drawn Seamless Tubes
ASTM B221 Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes

3. Trade Standards: Welded Austenitic Chromium-Nickel Stainless Steel Technique and Properties, as Published by the International Nickel Company, Inc., New York, New York, Porcelain Enamel Institute, Inc.

15.b
Packet Pg. 683 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MISCELLANEOUS METALS
CHLORINE CONVERSION PROJECT 05500-3

1.04 CONTRACTOR SUBMITTALS
A. Shop Drawings: Shop Drawings shall be submitted in accordance with General Conditions, Article 9 and Special Conditions, Article 9, Submittals.

B. Shop Drawings: Shop drawings for stairs, plates and hatches shall be submitted detailing fabrication and installation. Include plans, elevations, sections, and details and their connections. Show anchorage and accessory items. For grating, show the direction of span, type and depth of grating, size and shape of grating panels, seat angle details, and details of grating hold down fasteners.

C. Product List and Product Data Sheets: Protective Coating, a product list shall be submitted with product data sheets of intended shop coats.

1.05 QUALITY ASSURANCE
A. Carbon steel materials shall be fabricated and erected in accordance with the latest edition of the AISC "Specification for the Design, Fabrication and Erection of Steel for Buildings", and "Code of Standard Practice for Steel Buildings and Bridges", except whenever there is a discrepancy between the Design Drawings and this Specification, the Drawings shall govern.

B. Aluminum work shall be fabricated and erected in conformance with applicable requirements of the CBC and referenced standards for Aluminum.

C. Continuous Inspections: All welding and bolting of framing assemblies shall be conducted under the continuous inspection of an International Code Council (ICC) certified "Special Inspector" selected by the City with costs borne by the City.

Should such fabrication be performed in the shop of a licensed fabricator approved by the governing building official and certified by the ICC Evaluation Services, Inc.; only the field welding and bolting of structural framing assemblies will be required to be performed under continuous inspection of the ICC-certified "Special Inspector." The City shall be notified at least 24 hours in advance of needed inspections. Copies of inspection reports shall be provided for the City, Contractor, and governing building official.

PART 1 PRODUCTS

2.01 MATERIALS
A. Steel: Steel shall conform to the following requirements:

1. Shapes, Plates, Bars: ASTM A 36 or ASTM A992.

2. Pipe, Pipe Columns, Bollards: ASTM A 53, Type E or S, Grade B Schedule 40, unless noted otherwise.

B. Aluminum: Aluminum structural shapes shall be new and conform to 6061-T6 alloy and temper, unless otherwise noted.

C. Stainless Steel: Unless otherwise designated or approved, stainless steel alloy

15.b
Packet Pg. 684 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MISCELLANEOUS METALS
CHLORINE CONVERSION PROJECT 05500-4
types shall conform to ASTM A167 and ASTM A276 as follows:

1. Stainless steel plates, pipe and structural shapes: Type 316.

2. Stainless steel bolts, nuts and washers: Type 316 where connecting or bearing on aluminum.

D. Cast Iron: Cast iron shall conform to ASTM A48, except as otherwise noted.

E. Ductile Iron: Ductile iron shall conform to ASTM A536, using Grade 60-40-18 or better, except as otherwise noted.

F. Galvanizing: All galvanizing of steel shall conform to the requirements of the American Galvanizer’s Association, http://www.galvanizeit.orgl/. Hot-dip galvanizing of members shall conform to ASTM A123 with a minimum coating thickness of 2.3 oz./ft2. All hardware shall be hot-dip galvanized in conformance with ASTM A153 with a minimum coating thickness of 2.0 oz./ft2 .

2.02 GALVANIZING
A. Galvanizing for Iron and Steel: Galvanizing for iron and steel shall conform to ASTM A123, with the average weight of 2.0 ounces per square foot, and not less than 1.8 ounces per square foot.

B. Ferrous Metal Hardware Items: Ferrous metal hardware items shall conform to ASTM A153, with average coating weight of 1.3 ounces per square foot.

2.03 WELDING ELECTRODES
A. Steel Electrodes: Welding electrodes shall conform with AWS D1.1, except E7024 rods or electrodes shall not be used.

B. Aluminum Electrodes: Contingent upon alloys being welded, all welds shall conform to the requirements of AWS D1.2.

C. Stainless Steel Electrodes: Welding of stainless steel with electrodes and techniques shall conform to the pertinent AWS A5 series specification, and as recommended in Welded Austenitic Chromium-Nickel Stainless Steel Techniques and Properties as published by the International Nickel Company, Inc., New York, New York.

2.04 BOLTS
A. Bolt Requirements: Bolts shall comply with the following:

1. Nuts shall be capable of developing the full strength of the bolts. Threads shall be Coarse Thread Series conforming to the requirements of the American Standard for Screw Threads. Bolts and cap screws shall have hexagon heads and nuts shall be Heavy Hexagon Series. Include one washer per nut.

2. The length of all bolts shall be such that after joints are made up, each bolt

15.b
Packet Pg. 685 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MISCELLANEOUS METALS
CHLORINE CONVERSION PROJECT 05500-5
shall extend through the entire nut, but in no case more than 1/2-inch beyond the nut.

B. Standard Service Bolts (Not Buried or Inside Tanks or Channels): Except where otherwise indicated, all bolts, nuts and washers shall be Type 316 stainless steel.

C. Bolts Buried or Inside Tanks or Channels: Unless otherwise indicated, bolts, anchor bolts, nuts and washers which are buried, submerged, or below the top of the wall inside any hydraulic structure shall be Type 316 stainless steel.

2.05 SHOP PRIME PAINT
A. Shop Prime Paint: To ensure compatibility with deferred field-applied paint or coating systems, for ferrous metals other than stainless steel, galvanized steel and cast iron, provide surface preparations, and use shop prime paint product and manufacturer as painting, or protective coating system intended for field application. Shop prime shall not be provided on portions of work immediately adjacent to intended field welds, nor portions intended for embedment. Steel stair nosings shall be painted with industrial "Safety Yellow" enamel prime and finish coats conforming to California OSHA requirements.

2.06 MANUFACTURERS
A. Products of the type or model (if any) indicated shall be manufactured by one of the following:

1. Field Repairs to Galvanizing (or equal):
a. “Galvinox”.
b. “Galvo-Weld”.

PART 2 EXECUTION

3.01 FABRICATION AND INSTALLATION REQUIREMENTS
A. Fabrication and Erection: Except as otherwise indicated, the fabrication and erection of structural framing shall conform to the requirements of the American Institute of Steel Construction "Manual of Steel Construction."

1. The work of this Section shall be coordinated with related trades. Particular attention is required for items to be embedded in concrete work. All punchings and drillings, indicated or required, shall be provided for attachment of other work to that of this Section.

2. Compliance with Safety Requirements: Dimensions required for the fabrication and installation of handrails, ladders, grating, plate, pipe hangers and etc. which are not shown on the Drawings, shall conform to the Division of Occupational Health and Safety, General Industrial Safety Orders, State of California.

B. Protection: The Contractor shall provide and be responsible for protection and

15.b
Packet Pg. 686 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MISCELLANEOUS METALS
CHLORINE CONVERSION PROJECT 05500-6
repair of adjacent surfaces and areas which may become damaged as a result of work in this Section. Work performed hereunder shall be protected until completion and final acceptance of project by the City. The Contractor shall repair or replace all damaged or defective work to original specified condition at no additional cost to the City.

1. Finished floor surfaces and adjacent work shall be protected from damage.

Concrete floors shall not be overloaded. Mobile equipment used in placing steel shall have pneumatic tires. Steel members shall not be placed directly on floors; pads of timber or other material shall be used for cushioning.

2. Where welding is done in proximity to glass or finished surfaces, such surfaces shall be protected from damage due to weld sparks, spatter or tramp metal.

C. Hatches: The Contractor shall furnish and install a 1-1/2-inch drain line to the wet well.

D. Pipe and Conduit Supports and Bracing: Supports and bracing for pipe and conduit shall be fabricated and installed as detailed on the Drawings in a fully coordinated manner with the work of other trades. Where shown or indicated, hotdip galvanized shall be provided after fabrication, with touch-up of abraded or burned galvanizing using materials specified in this Section. Unless otherwise indicated, members shall be shop primed with a rust-inhibitive primer.

E. Embedded Steel Channel and Angle Frames: Embedded steel channel and angle frames shall be stainless steel and shall have continuously welded joints. Exposed welds shall be ground flush.

3.02 WELDING
A. Welding Steel: Welding shall be performed in accordance with the "Structural Welding Code-Steel", AWS D1.1, AWS D1.2, and AWS D1.6. Welders shall be qualified by tests in accordance with AWS B2.1.

3.03 GALVANIZING
A. Galvanizing: All structural steel plates shapes, bars and fabricated assemblies required to be galvanized shall, after the steel has been thoroughly cleaned of rust and scale, be galvanized in accordance with the requirements of ASTM A 123.

Any galvanized part that becomes warped during the galvanizing operation shall be straightened. Bolts, anchor bolts, nuts and similar threaded fasteners, after being properly cleaned, shall be galvanized in accordance with the requirements of ASTM A 153. Field repairs to galvanizing shall be made using "Galvinox," "Galvo-Weld," or equal.

3.04 PAINTING
A. Painting: One or more shop coats of paint shall be given on all ferrous metals, except cast-iron, ductile iron, stainless steel and galvanized metals. Before priming, surfaces shall be thoroughly cleaned. Shop coats shall be allowed to dry

15.b
Packet Pg. 687 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MISCELLANEOUS METALS
CHLORINE CONVERSION PROJECT 05500-7
before materials are loaded for delivery to the job site. After erection, all areas shall be painted where the shop coats have been rubbed off or omitted, and all field bolting and welding areas as specified for shop priming.

B. Isolation of Dissimilar Metals: Aluminum members shall be isolated from contact with dissimilar metals, concrete and masonry to provide protection from electrolytic deterioration. Unless otherwise indicated, the Contractor shall use non-absorptive tape or gaskets, a heavy brush coat of approved zinc chromate primer made with a synthetic resin vehicle, or a heavy coat of approved alkali, resistant bituminous paint.

END OF SECTION

15.b
Packet Pg. 688 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MISCELLANEOUS METALS
CHLORINE CONVERSION PROJECT 05500-8
This Page Intentionally Left Blank

15.b
Packet Pg. 689 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ADHESIVE ANCHORS
CHLORINE CONVERSION PROJECT 05503-1
SECTION 05503

ADHESIVE ANCHORS
PART 1 GENERAL

1.01 WORK OF THIS SECTION
A. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install adhesive anchors as shown and specified.

B. This Section includes all anchors required for the work, but not specified under other sections.

C. The types of work using adhesive anchors include, but are not limited to the following:

1. Hangers and brackets

2. Equipment

3. Piping

4. Electrical and plumbing work

1.02 RELATED SECTIONS
A. The work of the following sections applies to the work of this Section. Other sections, not referenced below, shall also apply to the extent required for proper performance of the work.

B. Miscellaneous Metals: 05500
C. Division 16 Electrical, other applicable sections

1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. The current edition of the California Building Code (CBC).

B. Comply with the applicable provisions and recommendations of the following, except as otherwise shown or otherwise specified.

1. ASTM F 593, Stainless Steel Bolts, Hex Cap Screws, and Studs C. Adhesive anchors shall be International Code Council (ICC) approved.

1.04 SUBMITTALS
A. Shop Drawings: Submit for approval in accordance with the requirements of General Conditions, Article 9 and Special Conditions, Article 9, Submittals, the following:

15.b
Packet Pg. 690 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ADHESIVE ANCHORS
CHLORINE CONVERSION PROJECT 05503-2

1. Setting drawings and templates for location and installation of anchorage assemblies.

2. Copies of manufacturer’s specifications, load tables, dimension diagrams and installation instructions for the devices.

3. Load and anchoring calculations signed and sealed by a California Registered Structural or Civil Engineer. All required calculations and certifications by a California Registered Professional Engineer shall be at the Contractor’s expense and shall be included with the Contractor’s bid.

1.05 QUALITY ASSURANCE
A. Manufacturers and suppliers of the materials specified herein shall be required to review and satisfy all relevant requirements of the Contract Documents. The Contractor, manufacturer, supplier, fabricator and/or subcontractors furnishing and/or installing equipment, materials, services and specialties associated with this Section shall fully coordinate their efforts to avoid potential claims that are based on failure to review relevant Contract Documents.

PART 2 PRODUCTS

2.01 DESIGN CRITERIA
A. When the size, length or load carrying capacity of an adhesive anchor for anchorage of equipment is not specified or not shown on the Drawings, provide the size, length and capacity required to carry the design load times a minimum safety factor of four.

B. Determine design loads as follows:

1. For equipment anchors, use the design load recommended by the manufacturer and approved by the construction manager.

2. For pipe hangers and supports, use one half the total weight of pipe, fittings, valves, accessories and water contained in pipe, between the hanger or support in question and adjacent hangers and supports on both sides.

3. Allowances for vibration are included in the safety factor specified above.

4. Seismic design loads shall be based on the CBC.

2.02 MATERIALS
A. Adhesive Anchors: Unless otherwise shown or specified, all drilled, concrete anchors shall be adhesive anchors. Expansion anchors shall not be used. No material substitutions will be considered.

15.b
Packet Pg. 691 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ADHESIVE ANCHORS
CHLORINE CONVERSION PROJECT 05503-3

1. Epoxy adhesive anchors are required for drilled anchors where anchoring framing connections, pumps, pipe hangers, and equipment. Epoxy system shall be HILTI HIT RE 500 or Simpson Set-XP. Threaded rod shall be Type 316 stainless steel.

PART 3 EXECUTION

3.01 INSPECTION
A. Contractor shall examine areas and conditions under which adhesive anchors are to be installed and notify the construction manager in writing of conditions detrimental to proper and timely completion of work. Do not proceed with work until unsatisfactory conditions have been corrected in a manner acceptable to the construction manager.

3.02 INSTALLATION
A. Adhesive Anchors and Adhesive Material: Contractor shall comply with the manufacturer’s installation instructions on the hole diameter and depth required to fully develop the tensile strength of the anchor or reinforcing bar. Contractor shall properly clean out the hole utilizing a wire brush and compressed air to remove all loose material from the hole, prior to installing adhesive capsules or material.

B. Adhesive anchor manufacturer’s representative shall observe and demonstrate the proper installation procedures for the adhesive anchors and adhesive material at no additional expense to owner. Each installer shall be certified, in writing, by the manufacturer to be qualified to install the adhesive anchors.

3.03 CLEANING
A. After installation, clean exposed anchors and/or bars.

3.04 FIELD QUALITY CONTROL
A. Contractor shall correct improper workmanship, remove and replace, or correct as instructed by the City, all anchors or bars found unacceptable or deficient, at no additional cost to the owner.

B. Contractor shall pay for all corrections and subsequent tests required to confirm the adequacy of the anchor.

END OF SECTION

15.b
Packet Pg. 692 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ADHESIVE ANCHORS
CHLORINE CONVERSION PROJECT 05503-4
This Page Intentionally Left Blank

15.b
Packet Pg. 693 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINT SEALANTS
CHLORINE CONVERSION PROJECT 07900-1
SECTION 07900

JOINT SEALANTS
PART 1 GENERAL

1.01 THE REQUIREMENT
A. The Contractor shall furnish all tools, equipment, materials, and supplies and shall perform all labor required to complete the work as indicated on the drawings and specified herein.

B. This Section covers all joint sealant as specified herein and shown on drawings.

1.02 RELATED WORK SPECIFIED ELSEWHERE
A. Joints in Concrete: 03290

1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. Comply with the reference specifications of the General Requirements.

B. Comply with the current provisions of the following Codes and Standards:

1. Commercial Standards
a. ASTM C 920 - Standard Specification for Elastomeric Joint Sealants
b. ASTM C 1193 - Standard Guide for Use of Joint Sealants

2. Federal Specifications
a. TT-S-001543A - Sealing Compound, Silicone Rubber Base (caulking, sealing and glazing in buildings and other structures) b. TT-S-00227 - Sealing Compound
c. TT-S-00230C(2) - Sealing Compound, Elastomeric Type, Single Component, (for caulking, sealing, and glazing in buildings and other structures)

3. Standard Specifications for Public Works Construction SSPWC Sections 201-3.

1.04 CONTRACTOR SUBMITTALS
A. Submittals Shall Be Made In accordance with the General Requirements.

B. The following submittals and specific information shall be provided.

1. Product Data: Surface preparation and installation instructions.

15.b
Packet Pg. 694 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINT SEALANTS
CHLORINE CONVERSION PROJECT 07900-2

2. Samples: Material proposed for use showing color range available, and marked with the manufacturer's name and product identification.

3. Applicator Qualification: Documentation showing minimum of 5 years experience installing sealants in projects of similar scope.

4. Contract Closeout Submittals: Guarantee.

1.05 QUALITY ASSURANCE (NOT USED)

1.06 ENVIRONMENTAL CONDITIONS (NOT USED)

1.07 GUARANTEE
A. Sealed Joints: Against adhesive and cohesive failure of sealant and for watertightness of sealed joints for a period of 5 years after date of final completion of sealants.

PART 2 PRODUCTS

2.01 GENERAL REQUIREMENTS
A. Like Items of Materials: All products of a type shall be of one manufacturer to achieve standardization for appearance, maintenance, and replacement.

B. Contractor Option: Immersible sealant may be substituted for nonimmersible sealant of the same material.

C. Characteristics

1. Uniform, homogeneous.

2. Free from lumps, skins, and coarse particles when mixed.

3. Nonstaining, nonbleeding.

4. Hardness of 15 minimum and 50 maximum, measured by Method ASTM C 661.

2.02 SEALANT MATERIALS
A. Type 1 - Silicone, Nonsag, Not Immersible

1. Silicone base, single-component, chemical curing; ASTM C 920, Type S, Grade NS, Class 25; and Federal Specification TT-S-001543, nonsag type, Class A;

2. Capable of withstanding movement up to 50 percent of joint width.

3. Manufacturer: Dow Corning Corp. No. 790; General Electric Silpruf; Sonneborn Sonolastic Omniseal; or equal.

15.b
Packet Pg. 695 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINT SEALANTS
CHLORINE CONVERSION PROJECT 07900-3

4. Color: Gray
B. Type 2 - Multi-Part Polyurethane, Self-Leveling, Immersible

1. Polyurethane base, multi-component, chemical curing; ASTM C 920, Type M, Grade P, Class 25; and Federal Specification TT-S-00227, selfleveling Type I, Class A.

2. Capable of being continuously immersed in water.

3. Manufacturer: Sonneborn Sonolastic Paving Joint Sealant; Pecora Corp.

Urexspan NR-200; H. S. Peterson Co. Iso-Flex 880GB; Mameco International Vulkem 245; or equal.

C. Type 3 - Multi-Part Polyurethane, Nonsag, Immersible

1. Polyurethane base, multi-component, chemical curing; ASTM C 920, Type M, Grade NS, Class 25; and Federal Specification TT-S-00227, nonsag Type II, Class A.

2. Capable of being continuously immersed in water.

3. Manufacturer: H. S. Peterson Co. Iso-Flex 881; Mameco International Vulkem 922; Product Research Corp. PRC 270; Sonneborn Sonolastic NP-II; or equal.

D. Type 4 - Multi-Part Polyurethane, Nonsag, Not Immersible

1. Polyurethane base, multi-component, chemical curing; ASTM C 920, Type M, Grade NS, Class 25; and Federal Specification TT-S-00227, nonsag Type II, Class A.

2. Manufacturer: Sonneborn Sonolastic NP-II; Pecora Corp. Dynatrol II; Tremco Dymeric; H. S. Peterson Co. Isoflex 2000; Mameco International Vulkem 227; or equal.

E. Type 5 - One-Part Polyurethane, Immersible

1. Polyurethane base, single-component, chemical curing; Federal Specification TT-S-00230, Type I or II, Class A.

2. Capable of being continuously immersed in water, withstand movement of up to 25 percent of joint width.

3. Manufacturer for Nonsag: Sonneborn Sonolastic NP-I; Sika Chemical Corp., Sikaflex-1a No. 430; Mameco International Vulkem 116; or equal.

4. Manufacturer for Self-Leveling: Sonneborn Sonolastic SL-1; Mameco International Vulkem 45; Sika Chemical Corp. Sikaflex 12SL; or equal.

F. Type 6 - One-Part Polyurethane, Not Immersible

15.b
Packet Pg. 696 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINT SEALANTS
CHLORINE CONVERSION PROJECT 07900-4

1. Polyurethane base, single-component, chemical curing; ASTM C 920, Type S, Grade NS, Class 25; and Federal Specification TT-S-00230, nonsag Type II, Class A.

2. Manufacturer: Pecora Corp. Dynatrol I; Tremco Dymonic; Sonneborn Sonolastic NP-I; or equal.

G. Type 7 - Multi-Part Polysulfide, Immersible

1. Polysulfide base, two-component, chemical curing; ASTM C 920, Type M, Grade P or NS, Class 25; and Federal Specification TT-S-00227, Type I self-leveling, Type II nonsagging, Class A.

2. Capable of being continuously immersed in water.

3. Manufacturer: W. R. Meadows CM-60, two-part; Sonneborn Sonolastic Two; or equal.

H. Type 8 - One-Part Polysulfide, Nonsag, Not Immersible

1. Polysulfide base, single-component, chemical curing; ASTM C 920, Type S, Grade NS, Class 12 1/2; and Federal Specification TT-S-00230, Type II nonsag, Class A.

2. Capable of withstanding movement up to 20 percent of joint width.

3. Manufacturer: W. R. Meadows CM-60, one-part; Sika Chemical Corp.

Sikaflex 440; Product Research Corp. PRC 7000; or equal.

I. Type 9 - One-Part Acrylic Terpolymer, Nonsag, Not Immersible

1. Acrylic base, single-component, solvent curing; Federal Specification TTS-00230, Type I nonsag, Class B.

2. Capable of withstanding movement up to 7.5 percent of joint width; Shore "A" hardness of 55 maximum.

3. Manufacturer: Pecora Chemical Corp. 60 + Unicrylic; Tremco Mono; or equal.

2.03 BACKUP MATERIAL
A. Nongassing, extruded, closed-cell round polyethylene foam rod, compatible with sealant used, and as recommended by sealant manufacturer, for joints greater than 3/16-inch wide.

B. Size: The diameter shall be as shown, or as recommended by sealant material manufacturer, or 25 percent greater than the nominal joint width.

C. The manufacturer's instructions for surface preparation and application shall be used as a guide for installation, except that the material shall not be installed by stretching it beyond its normal length.

15.b
Packet Pg. 697 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINT SEALANTS
CHLORINE CONVERSION PROJECT 07900-5
D. Manufacturer: Haveg Industries Minicel; Dow Corning Ethafoam SB; Sonneborn Sonofoam; Hercules, Inc., HBR; or equal.

2.04 BOND BREAKER
A. Pressure Sensitive Tape: Recommended by sealant manufacturer to suit application.

2.05 JOINT CLEANER
A. Noncorrosive and nonstaining type, recommended by sealant manufacturer; compatible with joint forming materials.

2.06 PRIMER
A. Nonstaining type recommended by sealant manufacturer to suit application.

2.07 SEALANT COLOR
A. Unless specifically noted, match the color of the principal wall material adjoining the area of application.

2.08 TAPE SEALANT
A. Closed cell polyvinyl chloride (PVC) foam coated on both sides with a modified acrylic pressure-sensitive adhesive.

B. Color: Black.

C. Size: 3/4-inch width by length as required by thickness as recommended by manufacturer, for particular application.

D. Properties

1. Tensile Strength (ASTM D 412, Die C): 80 psi.

2. Elongation (ASTM D 412, Die C): 125 percent.

3. Compression Set (ASTM D 1056): 30 percent max.

4. Compression Deflection (ASTM D 1056) at 25 Percent Deflection: 2.5 psi.

5. Low Temperature Flexibility, 5 Hours at -40 Degrees F: No cracking.

6. Heat Resistance/Maximum Shrinkage, 70 Hours at 212 Degrees F:

1.5 percent.

7. Staining (ASTM D 925) on Most Substrates: None.

8. Water Absorption by Weight at 30 Percent Compression: 24 percent.

9. Density per Cubic Foot (ASTM D 3574): 10 pounds.

15.b
Packet Pg. 698 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINT SEALANTS
CHLORINE CONVERSION PROJECT 07900-6

10. Thermal Conductivity (k factor): 0.24.

2.09 PREFORMED SEALS
A. Preformed Compressible Joint Seals

1. Widths Up to 5-Inches: Acme Highway Products Corp., Buffalo, NY, Acmaseal J-Series; Watson-Bowman Associates, Inc., Buffalo, NY, WASeries; H. S. Peterson Co. Isoflex Neoprene Seal, LS-Series, Pontiac, MI; or equal.

2. Other Widths: Series or model recommended by seal manufacturer.

PART 3 EXECUTION

3.01 PRODUCT HANDLING
A. Deliver sealants to the job site in sealed containers, each bearing manufacturer's name and product designation.

B. Store and protect sealant products from damage, deterioration, and contamination in accordance with manufacturer's written recommendations.

3.02 GENERAL
A. The sealing compound shall be applied in strict accordance with the manufacturer's published instructions by means of a pneumatic caulking tool or other approved method.

B. All packages of sealing compound shall be dated. No material shall be more than 6-months old when used. Material shall have been stored at temperatures lower than 80°F at all times. Use of more than one material for the same joint is not allowed unless approved by the sealant manufacturer.

C. Install joint sealants in accordance with ASTM C 1193.

D. Horizontal and Sloping Joints of 1 Percent Maximum Slope: Use self-leveling (Grade P) joint sealant.

E. Steeper Sloped Joints, Vertical Joints, and Overhead Joints: Use nonsag (Grade NS) joint sealant.

F. Use joint sealant as required for the appropriate application and as follows:

Joint Size Sealant Type
Less than 1-inch 1,2,3,4,5,6,7,8, or 9
Less than 2-inch 1,2,3,4, or 7
Over 2-inch As per manufacturer's recommendation

15.b
Packet Pg. 699 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINT SEALANTS
CHLORINE CONVERSION PROJECT 07900-7

3.03 PREPARATION
A. Verify that joint dimensions and physical and environmental conditions are acceptable to receive sealant.

B. All surfaces to which the sealing compound must bond shall be dry and free of dust, dirt, and other foreign residue, and shall be primed with the manufacturer's recommended primer for the particular surface.

C. Concrete surfaces shall be shaped and primed prior to caulking per manufacturer’s instructions.

1. Mask adjacent surfaces where necessary to maintain neat edge.

2. Notify Engineer at least 24 hours before installing any joint sealant.

D. Verify that joint shaping materials and release tapes are compatible with sealant.

E. Examine joint dimensions and size materials to achieve required width/depth ratios.

3.04 INSTALLATION
A. Use joint filler to achieve required joint depths and contour and to allow sealants to perform intended function.

1. Install backup material as recommended by sealant manufacturer.

2. Where possible, provide full length sections without splices; minimize number of splices.

B. Use bond breaker where recommended by sealant manufacturer.

C. Apply sealant with ambient temperature between 40 and 80 degrees F (4 and 27 degrees C).

D. Seal all joints around window, door and louver frames, expansion joints, and elsewhere as indicated.

E. Joint Sealant Materials: Follow manufacturer's recommendation and instructions, filling joint completely from bottom to top, without voids.

F. Joints: Tool slightly concave after sealant is installed.

1. When tooling white or light color sealant, use a water wet tool.

2. Finish joints free of air pockets, foreign embedded matter, ridges, and sags.

G. Tape Sealant: Locate where indicated and install in accordance with manufacturer's instructions.

15.b
Packet Pg. 700 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO JOINT SEALANTS
CHLORINE CONVERSION PROJECT 07900-8

3.05 PREFORMED SEALS
A. Prepare joint surfaces clean and dry, free from oil, rust, laitance, and other foreign material.

B. Construct joints straight and parallel to each other and at the proper width and depth.

C. Install within environmental conditions stated above.

D. Apply joint sealant manufacturer's approved primer and adhesive in accordance with manufacturer's instructions.

E. Install seal in accordance with manufacturer's instructions.

3.06 CLEANING
A. Clean surfaces next to the sealed joints of smears or other soiling resultant of sealing application.

B. Replace any damaged surfaces resulting from joint sealing or cleaning activities.

3.07 JOINT SEALANT SCHEDULE
A. This schedule lists the sealant types acceptable for each joint location. Use as few different sealant types as possible to meet the requirements of this project.

Joint Location Sealant Type(s)
Expansion/Contraction and Control Joints At:

Concrete Walls 1,3,4,5,6,7
Concrete Floor Slabs 2,5
Masonry Walls 1,3,4,5,6,7
Material Joints At:

Metal Door and Louver Frames (Exterior) 1,5,6,8
Metal Door and Louver Frames (Interior) 1,5,6,8,9
Wall Penetrations (Exterior) 1,5,6,8
All Penetrations (Interior) 1,5,6,8
Floor Penetrations 5,6,7
Ceiling/Roof Penetrations 1,3,4,5,6,7
Sheet Metal Flashings 1,3,5,7
Other Joints:

Threshold Sealant Bed 5
Immersed Concrete (Vertical and Sloped) 3,5
Immersed Concrete (Horizontal) 2,5
Openings Around Pipes, Conduits, and
Ducts through Fire-Rated Construction
11 Concrete Form Snap-Tie Holes 1,4,6

END OF SECTION

15.b
Packet Pg. 701 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO OEVERHEAD DORRS
CHLORINE CONVERSION PROJECT 08360-1
SECTION 08360

OVERHEAD DOORS
PART 1 GENERAL

1.01 THE REQUIREMENT
A. The Contractor shall provide overhead door assembly and frame and all appurtenant Work, complete and operable, in accordance with the Contract Documents.

1.02 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. Comply with the current provisions of the following standards:

1. Commercial Standards
a. ANSI/DASMA 108 - American National Standards Institute Standard Method For Testing Sectional Garage Doors And Rolling Doors: Determination Of Structural Performance Under Uniform Static Air Pressure Difference.
b. NFRC 102 - Test Procedure for Measuring the Steady-State Thermal Transmittance of Fenestration Systems.
c. ASTM E 330 - Standard Test Method for Structural Performance of Exterior Windows, Doors, Skylights and Curtain Walls by Uniform Static Air Pressure Difference.
d. ASTM A 653 - Standard Specification for Steel Sheet, ZincCoated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process.

2. Manufacturers' Standards: In addition to the standards listed above, overhead doors and frames and installation shall be in accordance with the manufacturer's published recommendations and specifications.

1.03 SUBMITTALS
A. Submittals shall be in accordance with the requirements of Section 01300.

B. Manufacturer's Information: Manufacturer's literature, installation instructions, and any engineering calculations that may be required elsewhere in this Section shall be submitted. Calculations by a civil or structural Engineer registered in California shall be submitted which show that the overhead door system and its structural connections are designed to meet code requirements and loads.

C. Shop Drawings: Shop drawings showing roughing-in diagrams, details of the product and systems, fasteners, and connections to adjoining materials, shall be submitted along with manufacturer's installation instructions.

D. Operation and Maintenance Manual: Upon completion, deliver to the Contractor

15.b
Packet Pg. 702 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO OEVERHEAD DORRS
CHLORINE CONVERSION PROJECT 08360-2
complete operation and maintenance instructions for the overheard roll-up door assemblies.

1.04 QUALITY ASSURANCE
A. Manufacturer's Qualifications: Overhead roll-up door shall be furnished as a complete unit produced by one manufacturer, including hardware, accessories, mounting and installation components.

B. Inserts and Anchorages: Provide inserts and anchoring devices that must be set in concrete or built into masonry to install units. Setting drawings shall be furnished, with templates, instructions, and directions to install anchorage devices.

C. Wind Loading: Overhead roll-up door shall be designed and reinforced to withstand a 30-psf wind-loading pressure.

D. Cycle Life: Design doors of standard construction for normal use of up to 20 cycles per day maximum.

1.05 WARRANTY
A. Warranty: Manufacturer’s limited door and operator system, except the counterbalance spring and finish, to be free from defects in materials and workmanship for 3 years or 20,000 cycles, whichever occurs first.

B. Warranty: Manufacturer’s limited door system warranty for 2 years for all parts and components.

PART 2 PRODUCTS

2.01 MANUFACTURERS
A. Overhead doors shall be manufactured by the following:

1. Overhead Door Corp.; Dallas, TX.

2. Cookson Co.; Phoenix, AZ.

3. Cornell Iron Works, Inc.; Mountaintop, PA.

4. Wayne-Dalton Corp.; Mt. Hope, OH.

5. Or equal.

2.01 ROLL-UP DOORS
A. General: Insulated roll-up doors shall be of the metal slat curtain design, chainoperated and shall be weather resistant. Doors shall by provided complete with slats, guides, hoods, galvanized hand-chain, brackets, hardware and all other items necessary for their installation and operation.

15.b
Packet Pg. 703 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO OEVERHEAD DORRS
CHLORINE CONVERSION PROJECT 08360-3
B. Curtain Slats: F265I Insulated, 24 gauge with flat slat galvanized steel with G-90 zinc coating conforming to ASTM A653.

C. Bottom Bar: Double Angle, Steel, Powder Coat-Black, Astragal D. Operation: Chain Hoist, Bracket Mount, Cast Gear Hoist, Right Hand.

E. Guides: Guides shall consist of a galvanized steel angle assembly of proper size to retain the curtain and to resist the wind loads. Guides shall be provided with weatherstripping.

F. Brackets: Fabricate from minimum 3/16-inch galvanized steel plate with permanently lubricated ball or roll bearings at rotating support points to support counterbalance shaft assembly and form end closures.

G. Hood: The hood shall be manufactured of 24 gage galvanized steel with reinforced top and bottom edges.

H. Weatherstripping

1. Bottom Bar: Neoprene or rubber astragal extending full width of door bottom bar.

2. Guides: Vinyl strip sealing against fascia side of curtain.

3. Hood: Neoprene/rayon baffle to impede airflow above coil.

I. Finish: Slats and hood shall be galvanized steel in accordance with ASTM A653 and receive rush-inhibitive, roll coating process including bonderizing, 0.2 mils thick baked-on prime paint and 0.6 mils thick baked-on polyester top coat. Nongalvanized exposed ferrous surfaces shall receive one coat of rush-inhibitive primer.

J. Color: Gray polyester top coat.

2.02 OPERATION
A. Chain operated doors shall open and close with a maximum of 30 pounds of effort.

2.03 LOCKING MECHANISM
A. Chain Holder: A chain holder shall be provided on wall with provision for padlocking.

PART 3 EXECUTION

3.01 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. Delivery of Materials: Manufactured materials shall be delivered in original and unbroken packages, containers, or bundles bearing the name of the manufacturer.

15.b
Packet Pg. 704 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO OEVERHEAD DORRS
CHLORINE CONVERSION PROJECT 08360-4
B. Storage: All materials shall be carefully stored in an area that is protected from the elements. Storage shall be in a manner that will prevent damage or marring of the door and its finish.

3.02 INSTALLATION
A. Installation shall be in accordance with shop drawings and manufacturer's printed recommendations and instructions.

B. Door and frame shall be accurately cut, fitted, and installed level, square, plumb, and in alignment. Fasteners shall be of sufficient length, and shall be sized for loads imposed. Door and frame shall be provided with accurately made cutouts, and shall be reinforced for strength where necessary.

C. Anchors and inserts for guides, brackets, motors, switches, hardware and other accessories shall be accurately located.

D. Guides shall be securely attached to adjoining construction.

3.03 REPAIR
A. Prime painted zinc-coated surfaces and bare zinc-coated surfaces that are damaged shall be repaired by the application of galvanizing repair compound.

All damaged shop primed painted surfaces shall be spot primed, including repaired prime painted zinc-coated surfaces.

3.04 ACCEPTANCE
A. After completing installation, including Work by other trades, door shall be lubricated, tested and adjusted to provide smooth, unbinding operation with all hardware fully operable.

B. Door closing shall be successfully demonstrated to the satisfaction of the Contractor, to function properly and consistently.

C. Furnish training to Owner’s maintenance personnel on procedures and schedules related to door operation, servicing, preventive maintenance, and procedures for resetting closing devices after activation.

END OF SECTION

15.b
Packet Pg. 705 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-1
SECTION 11000

EQUIPMENT GENERAL PROVISIONS
PART 1 GENERAL

1.01 DESCRIPTION
A. This Section specifies general requirements which are applicable to all mechanical equipment. The Contractor is responsible for ensuring that all mechanical equipment meets the requirements of this Section in addition to the specific requirements of the individual equipment specifications section.

B. The provisions of this Section shall apply, in general, to all equipment specified and where referred to, and they supplement the detailed equipment specifications. The detailed equipment specifications shall govern where this Section conflicts with detailed sections.

C. The Contractor shall furnish all tools, supplies, materials, equipment, and all labor necessary for the furnishing, construction, installation, testing, and operation of all equipment and appurtenant work, complete and operable, all in accordance with the requirements of the Contract Documents.

1.02 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. All equipment, products, and their installation shall be in accordance with the following standards, as applicable, and as specified in each section of these specifications:

1. American Society for Testing and Materials (ASTM)

2. American National Standards Institute (ANSI)

3. American Society of Mechanical Engineers (ASME)

4. American Welding Society (AWS)

5. American Bearing Manufacturers Association (ABMA)

6. American Gear Manufacturers Association (AGMA)
B. The following standards in particular are referred to in this Section:

1. ABMA 9 - Load Ratings and Fatigue Life for Ball Bearings

2. ABMA 11 - Load Ratings and Fatigue Life for Roller Bearings

3. ANSI B16.1 - Cast Iron Pipe Flanges and Flanged Fittings Class25, 125, 250, and 800

4. ANSI B16.5 - Pipe Flanges and Flanged Fittings, Steel, Nickel Alloy, and Other Special Alloys

15.b
Packet Pg. 706 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-2

5. ANSI B46.1 - Surface Texture

6. ANSI/ASME B1.20.1 - General Purpose Pipe Threads (Inch)

7. ANSI/ASME B31.1 - Power Piping

8. ASTM A48 - Specification for Gray Iron Castings

9. ASTM A108 - Specification for Steel Bars, Carbon, Cold-Finished, Standard Quality

1.03 SUBMITTALS
A. Submittals shall be made in accordance with the requirements of General Conditions, Article 9 and Special Conditions, Article 9.

B. The following shall be submitted:

1. Manufacturer’s product data including catalog cuts.

2. Equipment name, identification number and specification numbers.

3. Shop drawings showing details, dimensions, anchorage details, and installation of equipment with all special fittings, appurtenances and required clearances.

4. Shipping weights.

5. Calculations of equipment anchorage forces and anchorage details.

6. Certification that the single manufacturer accepts the indicated unit responsibilities.

7. Parts list with materials of construction by ASTM reference and grade.

8. Training Schedule.

C. List of at least 5 installations and telephone numbers, where identical equipment has been used.

1.04 SERVICES OF MANUFACTURER
A. Inspection, Startup, and Field Adjustment: The Contractor shall demonstrate that all equipment meets the specified performance requirements. Contractor shall provide the services of an experienced, competent, and authorized service representative of the manufacturer of each item of major equipment and shall visit the site of work to perform the following tasks.

1. Assist the Contractor in the installation of the equipment.

2. Inspect, check, adjust if necessary and approve the equipment installation.

15.b
Packet Pg. 707 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-3

3. Start-up and field-test the equipment for proper operation, efficiency, and capacity.

4. Perform necessary field adjustments during the test period until the equipment installation and operation are satisfactory to the Engineer.

5. Instruct the City’s personnel in the operation and maintenance of the equipment. Instruction prior to system testing of the equipment shall include step-by-step troubleshooting procedures with all necessary equipment testing.

6. The vendor’s representative shall provide a letter certifying the installation with approved test results attached.

B. Instruction of City’s Personnel

1. An authorized service representative of the manufacturer shall instruct the City’s personnel in the operation and maintenance of the equipment, including step-by-step troubleshooting with necessary test equipment.

Training shall be specific to the models of equipment provided.

2. The representative shall have at least one year of qualified experience in training covering the relevant subjects. A resume for the representative shall be submitted to the City.

3. The Contractor shall submit a training schedule for all the equipment, systems, and instrumentation indicated in the Specification Sections, including the hours for each training session and name of the trainers, at least 30 days before the first training. The Contractor shall resubmit the schedule every time there is a change in information.

4. Proposed training material and a detailed outline of each lesson shall be developed and submitted to the City for review. Comments from the City shall be incorporated into the material. The training shall be performed for the complete system with two (2) sessions.

5. Training materials shall remain with the trainees.

C. Local Service: The manufacturer shall have a local service agency that maintains properly trained personnel and adequate spare parts and is able to respond and complete repairs within 24 hours.

1.05 QUALITY ASSURANCE
A. Arrangement: The arrangement of equipment shown on the drawings is based upon information available to the Engineer at the time of design and is not intended to show exact dimensions particular to a specific manufacturer. The drawings are, in part, diagrammatic, and some features of the illustrated equipment installation may require revision to meet actual equipment installation requirements. Structural supports, foundations, connected piping, valves, and electrical conduit specified may have to be altered to accommodate the equipment provided. No additional payment will be made for such revisions and alterations.

15.b
Packet Pg. 708 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-4
B. Costs: The costs of all inspection, startup, testing, adjustment, and instruction work performed by factory-trained representatives shall be borne by the Contractor.

C. Public Inspection: It shall be the responsibility of the Contractor to inform the local authorities, such as building and plumbing inspectors, fire marshal, OSHA inspectors, and others, to witness all required permits and issue certificates, and pay all fees.

D. Manufacturer’s Experience: Unless otherwise directed by the Engineer, all equipment furnished shall have a record of at least 5 years of successful, trouble free operation in similar applications, from the same manufacturer.

1.06 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Product delivery, storage and handling shall be in accordance with the General Conditions and as described herein.

B. Delivery of Materials: Products shall be delivered in original, unbroken packages, containers, or bundles bearing the name of the manufacturer.

Materials delivered onsite without an approved submittal for verification shall be rejected and payment withheld.

C. Storage: Products shall be carefully stored in a manner that will prevent damage and in an area that is protected from the elements.

D. Protection of Equipment: Equipment shall be boxed, crated, or otherwise protected from damage and moisture during shipment, handling, and storage.

Equipment shall be protected from exposure to corrosive fumes and shall be kept thoroughly dry at all times. Pumps, motors, drives, electrical equipment, and other equipment with anti-friction or sleeve bearings shall be stored in weather tight storage facilities prior to installation. For extended storage periods, plastic equipment wrappers shall not be used to prevent accumulation of condensate in gears and bearings. Gears and bearings to be stored for extended periods shall be containerized suitable for export shipment.

E. Investigation of Failed Products: Prior to disposal of failed products, the Contractor shall investigate the causes of failure and submit a report to the Engineer, who will subsequently direct the Contractor for disposal.

PART 2 PRODUCTS

2.01 GENERAL
A General: Only products meeting the indicated requirements shall be provided.

B. Manufacturers: Products shall be new, of current manufacture, and shall be the products of reputable manufacturers specializing in the manufacture of such products.

C. Products: Materials shall be suitable for the intended purpose and free of defects and shall be recommended by the manufacturer for the application indicated.

15.b
Packet Pg. 709 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-5
D. No Endorsement: The listing of a manufacturer shall not be construed as an endorsement of a particular manufacturer’s product, nor shall it be construed that a named manufacturer’s standard product will comply with the indicated requirements. No preference is implied by the order of listing of named manufacturers, and the listings are not intended to be comprehensive. The manufacturer listings are only an indication that the City and Engineer believe that the named manufacturers are capable of producing equipment and products which will satisfy the indicated requirements.

2.02 GENERAL CONDITIONS
A. Noise Level: When in operation, no piece of equipment shall exceed the OSHA noise level requirements for a one-hour exposure.

B. Service Factors: Service factors shall be applied in the selection and design of mechanical power transmission components where so indicated in individual sections. When not indicated there, minimum service factors shall be 1.25.

C. Welding: Unless otherwise specified or shown, all welding shall conform to the following:

1. Composite fabricated steel assemblies which are to be erected or installed inside a hydraulic structure, including any fixed or movable structural components of mechanical equipment, shall have continuous seal welds and shall prevent entrance of air or moisture.

2. Welding shall be by the metal-arc method or gas-shielded arc method described in the American Welding Society’s “Welding Handbook” as supplemented by other AWS standards. Qualification of welders shall comply with AWS Standards.

3. In assembly and during welding, the component parts shall be clamped, supported, and restrained to minimize distortion and for control of dimensions. Weld reinforcement shall comply with the AWS code. Upon completion of welding, weld splatter, flux, slag, and burrs left by attachments shall be removed. Welds shall be repaired to produce a workmanlike appearance with uniform weld contours and dimensions.

Sharp corners of material which is to be painted or coated shall be ground to a minimum of 1/32-inch on the flat.

D. Identification of Equipment Items: Each item of equipment shall have an indelible, legible identifying mark corresponding to the equipment number indicated.

E. Shop Fabrication: Shop fabrication shall be performed in accordance with the shop drawings.

G. Tolerances: The variation in length of members without machine finished ends and which are to be framed shall not exceed 1/16-inch for members 30 feet or less and shall not exceed 1/8-inch for members over 30 feet.

15.b
Packet Pg. 710 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-6
H. Machine Finish: The type of finish shall be the most suitable for the application and shall be shown in micro-inches in accordance with ANSI B46.1. The following finishes shall be used:

1. Surface roughness not greater than 63 micro-inches shall be required for all surfaces in sliding contact.

2. Surface roughness not greater than 250 micro-inches shall be required for surfaces in contact where a tight joint is not required.

3. Rough finish not greater than 500 micro-inches shall be required for other machined surfaces.

4. Contact surfaces of shafts and stems which pass through stuffing boxes and contact surfaces of bearings shall be finished to not greater than 32 micro-inches.

I. Adaptation of Equipment: The Contract Drawings are based on non-certified equipment drawings. Equipment shall be adapted for installation and operation in the structures as shown on the drawings and as specified herein. No responsibility for alteration of a planned structure or layout to accommodate other types of equipment will be assumed by the City. Equipment which requires alteration of the structures or layout will be considered only if the Contractor assumes responsibility for making and coordinating all necessary alterations. Any alterations to structures, piping, ductwork, electrical, or other work necessary to accommodate other types of equipment if approved by the City, shall be made at the Contractor’s expense.

Equipment being approved as being of equal quality, performance, etc., may be substituted for that specified. Any revisions to structures, layout piping, ductwork, electrical, or other work made necessary by such substitution if approved by the Engineer shall be made at the Contractor’s expense. This provision includes all modifications necessary to install the equipment in conformance with final certified vendor prints.

Manufacturer’s names and model numbers are for the convenience of the Contractor. Two manufacturer’s products may not fit the same layout, foundation, enclosure, etc., thus requiring the Contractor to assume all financial burdens and responsibilities for any alterations and changes. Contractor shall require vendors or suppliers to check and verify all layouts, arrangements, dimensions, etc., of equipment used in the preparation of the Contractor’s bid. Any changes or alterations required in the Contract Documents as a result of the use of a specific supplier’s equipment shall be included in the Contractor’s bid price. Contractor is responsible for checking the layout and dimensions of all equipment submitted for approval. The detailed performance and material specifications shall take precedence over a model number specified in the event of a conflict. If detailed specifications have not been given, the manufacturer’s name and model number listed shall determine the performance and design criteria and configuration and quality for comparison, should an equal be submitted.

15.b
Packet Pg. 711 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-7
Electrical design has been based on non-certified vendor information regarding electrical requirements and has been based on the supply of energy efficient equipment. Motor horsepower shown is approximate. It is the Contractor’s responsibility to include in his bid price all changes in electrical conduit and wire size, circuit breakers, etc., necessary to accommodate any increase in electrical requirements of vendor supplied equipment. The Contractor is cautioned that this requirement applies to all equipment even when a vendor’s name and model number are listed in the specifications. All changes required to accommodate vendor-supplied equipment shall be the responsibility of the Contractor and

2.03shall be made at no additional cost to the City.

2.03 EQUIPMENT SUPPORTS AND FOUNDATIONS
A. Equipment Supports: Unless otherwise indicated, all equipment supports, anchors, and restrainers shall be adequately designed for static, dynamic, wind, and seismic loads. The design horizontal seismic force shall be computed on the basis of the procedures indicated in the California Building Code (CBC).

Additional site specific seismic information is indicated in the Geotechnical Report.

B. Equipment Foundations: Unless otherwise indicated, equipment foundations shall conform to the requirements of Section 11002.

2.04 PIPE HANGERS, SUPPORTS AND GUIDES
A. Pipe connections to equipment shall be supported, anchored, and guided to minimize stresses and loads on equipment flanges and equipment.

2.05 FLANGES AND PIPE THREADS
A. Flanges on equipment shall comply with ANSI B16.1, Class 125; or B16.5, Class 150, unless otherwise indicated. Threaded flanges and fittings shall have standard taper pipe threads complying with ANSI/ASME B1.20.1.

2.06 COUPLINGS
A. Flexible couplings shall be provided between the driver and the driven equipment to accommodate slight angular misalignment, parallel misalignment, end load, and to cushion shock loads. Where required for vertical shafts, 3-piece spacer couplings or universal type couplings for extended shafts shall be installed.

Selection of flexible coupling shall include service factor of driven equipment.

B. The Contractor shall have the equipment manufacturer recommend the size and type of coupling required to suit each specific application.

C. Taper-lock bushings may be used where indicated.

D. Where universal type couplings are indicated, they shall be of the needle bearing type construction, equipped with commercial type grease fittings. Bearings shall be sized in accordance with ABMA 11, using a 1.25 service factor, for the same L-10 life expectancy as the driven equipment, but not less than 50,000 hours.

15.b
Packet Pg. 712 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-8

2.07 SHAFTING
A. General: All shafting shall be continuous between bearings and shall be sized properly to transmit the power required. Keyways shall be provided in accordance with standard practice.

B. Materials: Shafting materials shall be selected for the type of service and torque transmitted and effect of corrosive gases, moisture, and fluids shall be considered. Unless otherwise specified, materials shall conform to the following:

1. Low carbon cold-rolled steel shafting shall conform to ASTM A108, Grade 1018.

2. Medium carbon cold-rolled steel shafting shall conform to ASTM A108, Grade 1045.

3. Corrosion-resistant shafting shall be stainless steel.

4. Extended shafting shall be carbon fiber/resin composite.

C. Differential Settlement: Where differential settlement between the driver and the driven equipment is indicated, an extension shaft with 2 sets of universal type couplings shall be provided.

2.08 BEARINGS
A. Unless otherwise specified, equipment bearings shall be oil or grease lubricated, ball or roller type, designed to withstand the stresses of the service specified.

Each bearing shall be rated in accordance with the latest revisions of AFBMA Methods of Evaluating Load Ratings of Ball and Roller Bearings. Unless otherwise specified, equipment bearings shall have a minimum L-10 rating life of 50,000 hours. The rating life shall be determined using the maximum equipment operating speed.

B. To assure satisfactory bearing application, fitting practice, mounting, lubrication, sealing, static rating, housing strength, and other important factors shall be considered in bearing selection.

C. All lubricated-for-life bearings shall be factory-lubricated with the manufacturer’s best recommended greases to insure maximum bearing life and best performance.

D. All bearings accessible to touch and located within 7 feet measured vertically from floor or working level or within 15 inches measured horizontally from stairways, ramps, fixed ladders or other access structures shall either incorporate bearing housings with sufficient cooling to maintain surface temperature at 65 degrees C or less for continuous operation at bearing rated load and a 50 degrees C ambient temperature or appropriate shielding shall be provided that will prevent inadvertent human contact.

15.b
Packet Pg. 713 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-9
E. Grease lubricated bearings, except those specified to be factory sealed and lubricated, shall be fitted with easily accessible grease supply, flush, drain and relief fittings. Extension tubes shall be used when necessary. Grease supply fittings shall be standard hydraulic Alemite type.

F. Oil lubricated bearings shall be equipped with either a pressure lubricating system or a separate oil reservoir type system. Each oil lubrication system shall be of sufficient size to safely absorb the heat energy normally generated in the bearing under a maximum ambient temperature of 60 degrees C and shall be equipped with a filler pipe and an external level indicator gage.

2.09 GEARS AND GEAR DRIVES
A. Except as otherwise indicated, gears shall be of the helical or spiral-bevel type, designed and manufactured in accordance with AGMA Standards, with a minimum service factor of 1.7, a minimum L-10 bearing life of 60,000 hours at the worst combination of specified operating conditions, in accordance with ABMA 9 or 11, and a minimum efficiency of 94 percent. Worm gears shall not be used.

B. Gear speed reducers or increasers shall be of the enclosed type, oil- or greaselubricated and fully sealed, with a breather to allow air to escape but keep dust and dirt out. The casing shall be of cast iron or heavy-duty steel construction with lifting lugs and an inspection cover for each gear train. An oil level sight glass and an oil flow indicator shall be provided and installed for easy reading.

C. Gears and gear drives as part of an equipment assembly shall be shipped fully assembled for field installation.

D. Material selections shall comply with AGMA values and the manufacturer’s recommendations. Input and output shafts shall be properly designed for the service and load requirements. Gears shall be computer-matched for minimum tolerance variation. The output shaft shall have 2 positive seals to prevent oil leakage.

E. Oil level and drain location shall be readily accessible. Oil coolers or heat exchangers with all required appurtenances shall be included where indicated.

F. Where gear drive input or output shafts connect to couplings or sprockets, the gear drive manufacturer shall supply matching key.

2.10 DRIVE CHAINS
A. Power drive chains shall be commercial type roller chains complying with ANSI standards and of materials best suited for the process fluid.

B. A chain take-up or tightener shall be provided in every chain drive arrangement.

C. A minimum of one connecting or coupler link shall be provided with each length of roller chain.

2.11 SPROCKETS

15.b
Packet Pg. 714 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-10
A. General: Sprockets shall be used in conjunction with chain drives and chain-type material handling equipment.

B. Materials: Except as otherwise indicated, sprockets shall comply with the following:

1. Sprockets with 25 teeth or less, normally used as a driver, shall be medium carbon steel in the 0.40 to 0.45 percent carbon range.

2. Type A and B sprockets with 26 teeth or more, normally used as driven sprockets, shall be minimum 0.20 percent carbon steel.

3. Large diameter sprockets with Type C hub shall be cast iron conforming to ASTM A48, Class 30.

E. Sprockets shall be accurately machined to ANSI Standards. Sprockets shall have deep hardness penetration in tooth sections.

F. Finish bored sprockets shall be provided complete with key seat and set screws.

G. Sprockets shall be of the split type or shall be provided with taper-lock bushings.

H. Idler sprocket shall be provided with brass or Babbit bushings, complete with oil hole and axial or circumferential grooving. Steel collars with set screws in both sides of the hub shall be provided.

2.12 V-BELT DRIVES
A. V-belts and sheaves shall be of the best commercial grade and shall conform to ANSI, MPTA, and RMA Standards.

B. Sheaves shall be machined from gray cast iron.

C. Sheaves shall be statically balanced. In applications where excessive vibration is expected, sheaves shall be dynamically balanced. Sheaves operating at belt speeds exceeding 6,500 fpm shall be of materials and construction recommended by the manufacturer.

D. Sheaves shall be provided complete with taper-lock or QD bushings as required.

E. Finish bored sheaves shall be provided complete with key seat and set screws.

G. Sliding motor bases shall be provided to adjust the tensions of V-belts.

2.13 DRIVE GUARDS
A. Power transmission, prime movers, machines, shaft extensions, and moving machine parts shall be guarded. Unless otherwise indicated for corrosive environment, the guards shall be constructed of minimum 10 gauge expanded, flattened steel with smooth edges and corners, galvanized after fabrication and securely fastened. Where required for lubrication or maintenance, guards shall have hinged and latched access doors.

15.b
Packet Pg. 715 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-11

2.14. FLEXIBLE CONNECTORS
A. Flexible connectors shall be installed in all piping connections to engines, blowers, compressors, and other vibrating equipment and in piping systems in accordance with the requirements of ANSI B31.1.

2.15 INSULATING CONNECTIONS
A. Where dissimilar materials are connected, insulating bushings, unions, couplings, or flanges, as appropriate, shall be used in accordance with the requirements of City’s Standard Specifications or directed by Engineer.

2.16 TOOLS AND SPARE PARTS
A. Tools: The work includes one complete set of special tools recommended by the manufacturer for maintenance and repair of each separate type of equipment; tools shall be stored in tool boxes and identified with the equipment number by means of stainless steel name tags attached to the box.

B. Spare Parts

1. All equipment shall be furnished with the manufacturers’ recommended spare parts, as indicated in the individual equipment sections.

2. Spare parts shall be tagged by project equipment number and identified as to part number, equipment manufacturer, and subassembly component (if appropriate). Spare parts subject to deterioration such as ferrous metal items and electrical components shall be properly protected by lubricants or desiccants and encapsulated in hermetically sealed plastic wrapping. Spare parts with individual weights less than 50 pounds and dimensions less than 2 feet wide, or 18 inches high, or 3 feet in length shall be stored in a wooden box with hinged wooden cover and locking hasp. Hinges shall be strap type. The box shall be painted and identified with stenciled lettering stating the name of the equipment, equipment numbers, and the words “spare parts.” A neatly typed inventory of spare parts shall be taped to the underside of the cover.

2.17 NAMEPLATES
A. Equipment Nameplates of stainless steel shall be engraved or stamped and fastened to the equipment in accessible locations with stainless steel screws or drive pins. Nameplates shall contain the manufacturer’s name, model, serial number, size, characteristics, and appropriate data describing the machine performance ratings.

2.18 SAFETY REQUIREMENTS
A. Where work construction areas are located within a flammable or toxic gas environment, suitable gas detection, ventilating, and oxygen deficiency equipment shall be provided. Workers shall be equipped with approved breathing apparatus.

15.b
Packet Pg. 716 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-12

2.19 ANCHOR BOLTS
A. Equipment suppliers shall furnish suitable anchor bolts for each item of equipment. Anchor bolts together with templates or setting drawings shall be delivered to permit setting the anchor bolts when the structural concrete is placed. Two leveling nuts shall be furnished for each bolt. The anchor for design calculations must be stamped by a California registered civil or structural Engineer.

B Unless otherwise shown on the drawings or specified, anchor bolts for items of equipment mounted on base plates shall be long enough to permit 1-1/2 inches of grout beneath the base plate and to provide adequate anchorage into structural concrete. Bolts shall extend with at least two threads over the nut after final alignment.

C. Unless otherwise specified or approved by the Engineer, anchor bolts, nuts, and washers shall be stainless steel.

2.20 LIFTING LUGS
A. Equipment weighing over 80 pounds shall be provided with lifting lugs.

2.21 PACKAGE EQUIPMENT REQUIREMENTS
A. Package systems to be provided from an Equipment Manufacturer (Vendor) have been defined in the individual mechanical specifications and the Contract Drawings. Where applicable, these package systems shall be pre-piped, prewired, pre-painted, and assembled on a common structural steel skid. In general, package systems shall be finish coated and insulated by the General Contractor after delivery to the jobsite. Painting shall be performed as defined herein. The General Contractor is ultimately responsible for supply and installation of all required equipment, accessories, and related appurtenances.

B. The General Contractor shall procure, install, modify as required, and make operable a first class installation of the package system as defined in the Contract Documents. Any changes required to meet these package specifications shall not be considered grounds for an extra work claim.

C. Package systems shall conform to requirements of this Section and all referenced Contract Documents.

PART 3 EXECUTION

3.01 INSTALLATION
A. Products and equipment shall be installed in accordance with the manufacturer’s written installation instructions, the requirements of this Section, the requirements of the individual equipment specifications, and as indicated on the Plans.

3.02 PIPE HANGERS, SUPPORTS, AND GUIDES

15.b
Packet Pg. 717 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-13
A. Hangers, supports, and guides shall be spaced in accordance with ANSI/ASME B31.1 standard.

3.03 COUPLINGS
A. Couplings shall be installed in accordance with the manufacturer’s instructions.

3.04 INSULATING CONNECTIONS
A. Insulating connections shall be installed in accordance with the manufacturer’s instructions.

3.05 ANCHOR BOLTS
A. Anchor bolts shall comply with this Section and applicable sections of Section 05500.

B. Installation of equipment anchor bolts shall comply with Section 11002.

3.06 PACKAGED EQUIPMENT
A. When any system is provided as pre-packaged equipment, coordination shall include space and structural requirements, clearances, utility connections, signals, outputs and features required by the manufacturer including safety interlocks.

END OF SECTION

15.b
Packet Pg. 718 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 11000-14
This Page Intentionally Left Blank

15.b
Packet Pg. 719 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT MOUNTING
CHLORINE CONVERSION PROJECT 11002-1
SECTION 11002

EQUIPMENT MOUNTING
PART 1 GENERAL

1.01 DESCRIPTION
A. This Section specifies minimum requirements for equipment supports, including concrete housekeeping pads, equipment bases, supports, anchorage, and accessories with weights greater than 200 pounds. If conflict existing between this Section and requirements of individual equipment manufacturers, the more restrictive requirements shall prevail.

B. The Contractor shall provide all supports, anchorage, and mounting of all equipment, unless otherwise specified in accordance with the manufacturer’s recommendations, and requirements of industry standards. Each piece of equipment shall be anchored to resist the greater of the maximum lateral and vertical forces required by the local governing code or by the manufacturer of the equipment, whichever is greater. This force shall be considered acting at the center of gravity of the piece under consideration. No equipment shall be anchored to vertical structural elements without written approval of the Engineer.

The Contractor shall provide all elements required to resist the calculated forces described herein or required by the equipment manufacturer. The Contractor shall provide certification that for equipment, 20 horsepower and larger, anchor bolt calculations showing adequacy of bolt sizing and anchor embedment have been performed and signed by a California registered structural or civil Engineer.

1.02 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. Comply with the Reference Specifications of the General Conditions.

B. All equipment, products, and their installation shall be in accordance with the following standards, as applicable, and as specified:

1. API 686 - Recommended Practices for Machinery Installation and Installation Design

2. ASTM C531 - Linear Shrinkage and Coefficient of Thermal Expansion of Chemical Resistant Mortars, Grouts, and Monolithic Surfacings

3. ASTM C579 - Compressive Strength of (Method B) Chemical Resistant Mortars and Monolithic Surfacings

4. ASTM C638 - Tensile Properties of Plastics

5. ASTM C882 - Bond Strength of Epoxy-Resin Systems Used with Concrete

6. ASTM C884 - Thermal Compatibility between Concrete and an EpoxyResin Overlay

15.b
Packet Pg. 720 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT MOUNTING
CHLORINE CONVERSION PROJECT 11002-2

7. ASTM C1181 - Creep of Concrete in Compression
8 ASTM D2471 - Gel Time and Peak Exothermic Temperature of Reacting Thermosetting

9. SSPC - Society for Protective Coatings Specifications, Vol. 2

1.03 SUBMITTALS
A. In addition to the requirements listed in the detailed specification, the following shall be submitted in accordance with the requirements of General Conditions, Article 9 and Special Conditions, Article 9.

1. Shop drawings for all equipment bases and anchorage details.

2. Certification of anchor bolt calculations.

3. Machine and equipment base installation schedule with manufacturers’ anchor bolt torque requirements.

4. Results of grout strength tests.

PART 2 PRODUCTS

2.01 GENERAL
A. Unless otherwise specified, equipment and driver shall be rigidly mounted on a common cast iron or fabricated steel base plate or sole plate grouted into place on concrete housekeeping pads. All equipment shall be mounted on concrete housekeeping pads. Under no circumstances shall equipment supports be grouted directly to concrete slabs or floors. Bases for equipment shall be hot-dip galvanized after fabrication unless otherwise specified. Mounting pads for equipment shall have the zinc layer removed and shall be finished flat and parallel after galvanizing. Sole plates and leveling plates shall not be galvanized.

B. Prior to initiating any installation efforts, the Contractor shall produce a machine base schedule containing the expected dates for setting anchor bolts, casting housekeeping pads, preparation of housekeeping pads for grouting, grouting, and final anchor bolt clamping for each item of equipment. The schedule shall list the equipment, by equipment number, and shall be accompanied by written verification of anchor bolt clamping torque from the equipment manufacturer.

C. Installation practices shall follow the guidance presented in API Recommended Practice 686, unless superseded by more restrictive requirements of these specifications or manufacturer requirements.

2.02 CONCRETE PADS
A. Concrete housekeeping pads for equipment and floor penetrations shall be at least 3 inches larger in plan than the steel or cast base and not less than 6 inches above the finished floor elevation and shall be shaped to drain liquids

15.b
Packet Pg. 721 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT MOUNTING
CHLORINE CONVERSION PROJECT 11002-3
away from the base. All conduits, piping connections, drains, etc., serving the equipment, shall be enclosed by the concrete pad. Unless otherwise specified, no conduits, piping connections, drains, etc., will be accepted which rise directly from the floor.

2.03 EQUIPMENT BASES
A. General

1. Unless otherwise specified, mounting bases for equipment 20 horsepower and larger shall be a minimum of 1 inch thick. All bases shall have edges bearing on the grout surface rounded to a radius of not less than 2 inches to avoid producing stress risers on the grouted foundation.

Grout pouring holes shall be provided in all bases and all bases shall have grout release holes. Internal stiffeners shall be provided and shall be designed to allow free flow of grout from one section of the base to another. The minimum acceptable opening in cross-bracing and stiffeners shall be 2 inches high by 6 inches in length. All welds shall be continuous and free from skips, blow holes, laps and pockets.

2. Mounting holes for anchor bolts in the bases shall be drilled and not burned out and they shall not be open slots. All mounting studs shall be Type 316 stainless steel. A non-seize or non-galling compound shall be used on all threads.

3. Mounting pads for equipment shall be machined after all welding and stress relieving and shall be coplanar to 0.002 inch in all directions.

Mounting pads shall extend not less than 1 inch on all sides beyond the position for the equipment.

4. Sole plates, mounting blocks and base plates weighing more than 1,000 pounds shall be leveled with jackscrews incorporated into the fabrication.

Jackscrews shall be located in thickened pads or otherwise in sufficient metal to provide ease in adjusting level.

5. Provide a stud suitable for bolting a 3/8 inch lug to all bases for the electrical ground. Coordinate grounding stud location with the grounding conductor location so the minimal length of grounding conductor is exposed.

B. Type I Bases: Type I bases shall be structural steel bases with thickened steel pads for doweling. The bases shall be rectangular in shape for equipment other than centrifugal refrigeration machines and pump bases, which may be “T” or “L” shaped to accommodate the equipment drive and accessories. Pump bases for split case pumps shall include supports for suction and discharge base ells.

Perimeter members shall be beams with a minimum depth equal to 1/10th of the longest dimension of the base. Beam depth need not exceed 14 inches provided that the deflection and misalignment is kept within acceptable limits as determined by the manufacturer. Grout holes shall be provided for the bases of all equipment where vibration isolation is not specified.

15.b
Packet Pg. 722 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT MOUNTING
CHLORINE CONVERSION PROJECT 11002-4
C. Type II/III Bases: Not Used.

D. Type IV Bases: Type IV bases shall be cast iron. Cast iron bases located within a building, tunnels, or galleries do not require galvanizing but shall be sealed in accordance with the requirements for bleeding surfaces prior to grouting. All fasteners requiring connections to the base shall be terminated by nuts welded to the bottom side of the base and plugged with cork, plastic plugs or grease, or acorn nuts. In no case shall the fastener terminate only into the metal base.

E. Sole Plates: Where sole plates are provided, the underside shall be scribed with the words “THIS SIDE DOWN” using welding rod material prior to milling the equipment mating surface flat to a tolerance of not less than 0.002/foot in all directions. Sole plates shall be designed to be installed in the housekeeping curbs shown.

2.04 GROUT FOR EQUIPMENT BASES
A. Epoxy Grout

1. Unless otherwise specified, grout for equipment bases shall be nonshrinking epoxy grout conforming to the following requirements:

Test Result
ASTM C531 Shrinkage shall be less than 0.080 percent and thermal expansion less than 17 x 106 in/in/deg F
ASTM C579 Strength shall be a minimum of 12,000 psi in 7 days when tested by method B, modified
ASTM C882 Bond strength to Portland concrete shall be greater than 2,000 psi ASTM C884 Epoxy grout shall pass the thermal compatibility test when overlaid on Portland cement concrete
ASTM D638 Tensile strength shall not be less than 1,700 psi. Modulus of elasticity shall not be less than 1.8 x 106 psi
ASTM C1181 Creep of the epoxy grout shall be less than 0.005 in/in with the test at 70 deg F and 140 deg F with a load of 400 psi
ASTM D2471
Peak exothermic temperature shall not exceed 110 deg F when a specimen 6 inch diameter x 12 inches high is used. Gel time shall be at least 150 minutes

2. The vehicle shall be a two-component (liquid and hardener) system designed to yield the above characteristics when combined with the manufacturer’s recommended aggregate system. The grout shall be suitable for supporting precision machinery subject to high impact and shock loading in industrial environments while exposed to elevated temperature as high as 150 degrees F, with a load of 1,200 psi.

Aggregate for equipment base grout shall be as furnished by the manufacturer of the epoxy grout mix.

B. Cementitious Grout: Cementitious grout for use with equipment supports for equipment rated 5 horsepower and smaller or weighing less than 1,000 pounds, whichever is less, shall be non-shrink grout. Procedures for leveling and clamping equipment shall be as specified in this Section.

15.b
Packet Pg. 723 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT MOUNTING
CHLORINE CONVERSION PROJECT 11002-5

2.05 EPOXY PRIMER
A. The epoxy primer shall be lead free, chrome free, rust inhibitive, two-component epoxy primer specifically designed for use on metal substrates and in conjunction with epoxy grout. The epoxy primer shall be a product of the epoxy grout manufacturer.

2.06 ANCHOR BOLTS
A. Anchor bolts shall be as specified in Section 11000 and Section 05500, set in PVC sleeves. Sleeves shall allow a free length projection of not less than fifteen bolt diameters above the concrete required to develop the strength of the bolt.

Projection above the nut on the base plate or sole plate shall be no more than 3/4 inch. Anchor bolts shall be located not less than six anchor bolt diameters from the foundation edge in all directions.

PART 3 EXECUTION

3.01 GENERAL
A. Equipment shall be anchored directly to the supporting floor system. In addition to the anchorage, all such equipment shall be internally designed so that all static and moving parts are anchored to the supporting framework to resist the imposed forces. All forces shall be transmitted to the base in order to be anchored as required.

B. Equipment which is not mounted on vibration isolators shall be anchored directly to the supporting floor system. In addition to the anchorage, all such equipment shall be internally designed so that all static and moving parts are anchored to the supporting framework to resist the imposed seismic force. All forces must be transmitted to the base in order to be anchored as required.

C. Piping with flexible connections and/or expansion joints shall be anchored such that the intended uses of these joints are maintained in the piping system.

Conduit and piping for future equipment shall be capped flush with the floor or concrete pad in such a manner to allow future connection.

D. The Contractor shall coordinate location of electrical conduit and piping penetrations within the concrete pad and equipment base. All penetrations shall stub-up on the same side of the equipment as required for connection to the equipment. Equipment drains shall be located as required for drainage from equipment.

3.02 INSTALLATION
A. Anchor Bolts

1. Prior to concrete placement, anchor bolts shall be accurately set according to the manufacturer’s foundation drawings and firmly secured to prevent shifting during concrete placement. Drilled in anchor bolts will not be accepted. The bolts shall be embedded in the structural concrete

15.b
Packet Pg. 724 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT MOUNTING
CHLORINE CONVERSION PROJECT 11002-6
to develop the full strength of the bolt. Concrete in housekeeping pads cannot be used for this purpose. All anchor bolts shall be dimensionally checked against the foundation drawings for proper length, diameter, thread length, thread projection, etc. Prior to placing concrete for the housekeeping pad, plastic sleeves shall be placed around each bolt to provide for minor adjustment of bolt position prior to grouting. Sleeves shall be filled with a pliable, nonbonding material such as silicon rubber or wax to prevent contact between the concrete or grout and the anchor bolt.

Bolt threads and projections in the sleeves above the structural slab shall be protected in the sleeve by heavily greasing or waxing the threads and shank with paste wax and wrapping with plastic sheeting. The protective wrapping shall be firmly secured with tie wires. The protective wrapping shall be removed prior to placing the grout.

2. The equipment manufacturer shall recommend the size of the anchor bolts for the equipment and shall also furnish the recommended tightening torque for the nuts; however, the minimum size bolt shall be 3/4 inch for equipment rated 20 to 100 horsepower, 1 inch for equipment rated over 100 to 300 horsepower and 1-1/4 inches for 300 to 500 horsepower. Anchor bolts for equipment rated over 500 horsepower shall be as recommended by the manufacturer of the equipment and as approved by the Engineer.

B. Concrete Housekeeping Pad Preparation

1. After the concrete is fully cured (sample cylinders), shall be taken and tested for all housekeeping pads supporting equipment weighing more than 1,000 pounds), the housekeeping pad shall be chipped approximately 3/4 inch to 1 inch to remove all laitance and defective or weak concrete. A light duty, hand held pneumatic chipper with a chisel type tool shall be used for chipping the foundation. Abrasive blast, bushhammer, jack hammers with sharp chisels or needle gun preparation of concrete surfaces to be grouted are not acceptable. The amount of concrete removed shall be such that the final base plate or sole plate elevation results in not less than 3 inches of grout between the surface of the housekeeping pad and lower base plate flange or the underside of the sole plate.

2. All edges shall be chamfered 2 to 4 inches at a 45-degree angle. All dust, dirt, chips, oil, water, and any other contaminants shall be removed and the foundation shall be covered with protective plastic sheeting. The grout contact surface on the housekeeping pad shall be coated with one coat (not more than 5 mils) of catalyzed epoxy resin.

C. Equipment Bases and Sole Plates: All surfaces of equipment bases and sole plates to be in contact with epoxy grout shall be cleaned to SP-6 of the Steel Structures Painting Council (SSPC) and shall be primed with epoxy primer within 8 hours of cleaning.

D. Leveling and Shimming

15.b
Packet Pg. 725 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT MOUNTING
CHLORINE CONVERSION PROJECT 11002-7

1. All equipment bases and equipment shall be leveled against steel surfaces. Use of other materials for leveling purposes is strictly and specifically prohibited. Unless otherwise specified, base plates, mounting blocks and sole plates weighing less than 1,000 pounds shall be leveled on steel blocks 4 inches square and 1-1/2 inches thick with a hole drilled in the center for the anchor bolt, placed under the base at every anchor bolt. Leveling shall be by use of mounting blocks machined flat on all horizontal surfaces and measuring not less than 4 inches wide horizontally and shims that shall extend not less than three inches beyond the base of the equipment. Mounting blocks shall be coated with a light oil just prior to beginning the leveling and grouting work. Using precut steel shims coated with a light oil between the base and the steel blocks at the anchor bolts, the Contractor shall level the equipment base plates, sole plates or mounting blocks against the anchor bolt nuts (finger tight only) to a maximum tolerance of 0.0005 in/ft or as otherwise required by the equipment manufacturer, if more stringent. Mounting surfaces for equipment shall be coplanar within 0.002 inch in any direction. The shims shall be placed so the tabs on the shims are easily accessible. A minimum of four shims per anchor bolt shall be used. The total shim thickness at each anchor bolt shall be at least 0.015 inch. Leveling shall be against anchor bolts prior to final grouting.

2. The Contractor shall level the equipment against the anchor bolt nuts to a maximum tolerance of 0.002 in/ft or as otherwise required by the equipment manufacturer, if more stringent. Leveling equipment shall be precision surveying equipment. Machinists’ spirit levels will not be permitted for leveling purposes for any base plate or equipment foundation with a plan dimensions greater than 4 feet.

3. Leveling nuts may be used for mounting equipment weighing less than 500 pounds. The Contractor shall level the equipment against the anchor bolt nuts to a maximum tolerance of 0.0005 in/ft or as otherwise required by the equipment manufacturer, if more stringent. Anchor bolt nuts shall be only finger tight during the leveling process. Wedges will not be allowed and under no circumstances shall shims be used as permanent support under base plates, sole plates or leveling plates.

E. Grouting

1. Grout forms shall be built of minimum of 3/4-inch thick waterproof plywood and shall be securely braced (minimum brace size shall be 2 inches x 4 inches). Forms shall provide a minimum of 2-inch hydrostatic head above the final elevation of the grout to assist in flow during installation.

2. Forms must be coated with three coats of paste wax on all areas that will come in contact with the grout to prevent the grout from bonding to the forms. Forms shall be waxed before assembly to prevent accidental application of wax to surfaces where the grout is to bond. Before any forms are installed, all concrete surfaces that will contact epoxy grout shall be free form any foreign material, such as oil, sand, water, grease,

15.b
Packet Pg. 726 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT MOUNTING
CHLORINE CONVERSION PROJECT 11002-8
etc. Forms shall be liquid-tight. Any open spaces or cracks in forms, or at the joint between forms and the foundation, shall be sealed off, using sealant. All outside vertical and horizontal edges of the grout shall have 45-degree chamfers. Blockouts shall be provided at all shimming and leveling nut positions to allow removal of shimming equipment after the grout has cured. Jackscrews shall be coated with a light oil or other acceptable bond-breaking compound.

3. The 45-degree chamfer strip shall be located at the final elevation of the grout. The final elevation of the grout on base plates with exposed Ibeam or C-channel supports shall be at the top of the lower support flange. The top of the grout, on base plates with solid sides and sole plates, shall be 1 inch above the bottom of the base plate or the underside of the sole plate. The grout’s final elevation shall not be so high as to bond the anchor bolt nut and washer.

4. The epoxy resin and hardener shall be mixed in accordance with the grout manufacturer’s recommendations. Aggregate shall be slowly added to the mixer one bag at a time. The grout shall be mixed only long enough to wet out all the aggregate. Grout shall be placed at the center of one end of the base plate or sole plate and worked toward the ends in such a manner as to force the air out from beneath the base plate or sole plate and out the vent holes, to eliminate voids. The grout shall be placed in a manner that avoids air entrapment using a head box to pour grout into the grout holes. When the head box is moved to the next grout hole, a 6-inch high standpipe shall be placed over the grout hole and filled with grout. The Contractor shall exercise care to never allow the grout to fall below the base plate level once the grout has made contact with the base plate. Grout placement shall be continuous until all portions of the space beneath the base plate or sole plate have been filled. Subsequent batches of grout shall be prepared so as to be ready when the preceding batch has been placed. Under no circumstances shall the grouting operation be halted because of lack of grout mix. After the entire base plate is full, 6-inch high standpipes shall be maintained over each grout hole, to continue purging of air. When the grout has started to take an initial set (determined by a noticeable increase in temperature and no flow of grout at the vent holes) the standpipes shall be removed and excess grout cleaned from all surfaces.

5. A grout sample shall be taken for each piece of equipment to be grouted.

The sample shall be placed in a cylinder of sufficient size to yield three 2- inch x 2-inch x 2-inch test samples. The samples shall be tagged with the equipment number and ambient temperature at the time of placement.

The samples shall be tested in accordance with the manufacturer’s recommendations. Once the epoxy grout cylinder has been completely filled, it shall be placed next to the foundation of the equipment being grouted and allowed to cure for 48 hours. After 48 hours, the test cylinder shall be tested in accordance with the grout manufacturer’s recommendations by an independent testing laboratory. The results shall be reported directly to the Engineer. Forms shall be removed only after the grout has cured sufficiently and upon specific permission from the Engineer.

15.b
Packet Pg. 727 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT MOUNTING
CHLORINE CONVERSION PROJECT 11002-9
F. Completion: Upon acceptance by the Engineer and the grout has reached sufficient strength, the shims shall be removed, and leveling nuts or jack screws backed off to allow the grout to fully support the equipment base, leveling block or sole plate. Removal of extended shimming material (direct mounted base plates weighing 1,000 pounds or less) shall be by sledge hammer, taking care not to damage the grout. Once shims have been removed, or jack screws backed off, the anchor bolts shall be torqued, using calibrated indicating torque wrenches, to develop the full clamping force required by the equipment manufacturer. Anchor bolts shall be torqued in increments of not more than 25 percent of final value in an alternating pattern to avoid stress concentration on the grout surface. Pockets for access to shims, or leveling nuts shall be filled with grout mix and pointed after the anchor bolts have been torqued to final values.

END OF SECTION

15.b
Packet Pg. 728 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO EQUIPMENT MOUNTING
CHLORINE CONVERSION PROJECT 11002-10
This Page Intentionally Left Blank

15.b
Packet Pg. 729 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PUMPS, GENERAL
CHLORINE CONVERSION PROJECT 11210-1
SECTION 11210

PUMPS, GENERAL
PART 1 GENERAL

1.01 THE REQUIREMENT
A The Contractor shall furnish and install all tools, equipment, materials, and supplies and shall perform all labor necessary for the installation, testing, and placing into operation of all pumps and pumping appurtenances, complete and operable, in accordance with the requirements of the Contract Documents.

B. The provisions of this Section shall apply to all pumps and pumping equipment specified, except where otherwise specified in the Contract Documents.

C. The Contractor shall assign to a single manufacturer full responsibility for the furnishing and functional operations of the complete pump system including the pumps, drives, drive motors, speed control equipment (where variable speed drives are required) and accessories. The designated single manufacturer, however, need not manufacture more than one part of the unit (pump, or motor and drive), but shall coordinate the design, assembly, testing, and erection of the unit(s), as specified herein.

1.02 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. All equipment, products, and their installation shall be in accordance with the following standards, as applicable, and as specified:
1 ANSI B16.1 - Cast Iron Pipe Flanges and Flanged Fittings, Class 25, 125, 250, and 800
2 ANSI B16.5 - Pipe Flanges and Flanged Fittings, Steel Nickel Alloy and Other Special Alloys
3 ANSI/IEEE 112 - Test Procedure for Polyphase Induction Motors and Generators
4 ANSI/IEEE 115 - Test Procedure for Synchronous Machines 5 ASTM A48 - Specification for Gray Iron Castings
6 ASTM B62 - Specification for Composition Bronze or Ounce Metal Castings
7 Latest Edition - Hydraulic Institute Standards for Centrifugal, Rotary, and Reciprocating Pumps

15.b
Packet Pg. 730 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PUMPS, GENERAL
CHLORINE CONVERSION PROJECT 11210-2

1.03 SUBMITTALS
A. In addition to the requirements of Section 01300 and the material listed in the detailed specification, the following shall be submitted in compliance with the General Conditions:
1 Pump name, identification number and specification number. 2 Performance curve and pump data.
3 The Contractor shall require the manufacturer to indicate points on the H/Q curves, and the limits recommended for stable operation between which the pumps may be operated without surge, cavitation and vibration. The stable operating range shall be as wide as possible based on the pumps actual hydraulic and mechanical tests.
4 Pump detailed description and specification.
5 Electrical data including control and wiring diagrams. 6 Assembly and installation drawings including shaft size, seal, coupling, anchor bolt plan, part nomenclature, material list, outline dimensions and shipping weights.
7 Pump drive and motor.
8 Bearing life calculations.

A. Certification: The Contractor shall obtain written certification from the pump manufacturer, addressed to the City, stating that the equipment will efficiently and thoroughly perform the required functions in accordance with these specifications and as shown, and that the pump manufacturer accepts joint responsibility with the Contractor for coordination of all equipment, including motors, variable speed drives, controls, and service required for proper installation and operation of the completely assembled and installed pumps. The Contractor shall submit all such certificates to the Engineer.

B. Technical Manuals: Prior to startup, the Contractor shall furnish the City complete operations and maintenance manuals in accordance with the General Conditions.

C. Tools: Special tools necessary for maintenance and repair of the pumps and one pressure grease gun for each type of grease required for pumps and motors shall be furnished as a part of the work hereunder; such tools shall be suitably stored in metal tool boxes, and identified with the equipment number by means of stainless steel name tags attached to the box.

D. Spare Parts: The Contractor shall obtain and submit from the manufacturer a list of recommended spare parts for each piece of equipment. After approval, Contractor shall furnish such spare parts suitably packaged, identified with the equipment number and labeled. Contractor shall also furnish the name, address,

15.b
Packet Pg. 731 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PUMPS, GENERAL
CHLORINE CONVERSION PROJECT 11210-3
and telephone number of the nearest distributor for each piece of equipment. All spare parts are intended for use by the City, only, after expiration of the guaranty period. Any spare parts which the Engineer permits the Contractor to use for startup activities shall be replaced by the Contractor prior to the City’s acceptance of beneficial use of the equipment.
1 During the term of this Contract, the Contractor shall notify the Engineer in writing about any manufacturer’s modification of the approved spare parts, such as part number, interchangeability, model change or others. If the Engineer determines that the modified parts are no longer applicable to the supplied equipment, the Contractor at its expense shall provide applicable spare parts.

E. Field Procedures: Instructions for field procedures for erection, adjustments, inspection, and testing shall be provided prior to installation of the pumps.

1.04 QUALITY ASSURANCE
A. Performance Curves: All centrifugal pumps shall have a continuously rising curve. In no case shall the required horsepower at any point on the performance curve exceed the rated horsepower of the motor or engine.

B. Equipment Testing: The Contractor shall be responsible for the coordination of the following tests of each pump, drive and motor:
1 General: Tests shall be performed in accordance with the Test Code for Centrifugal Pumps of the Standards of the Hydraulic Institute, Inc. Tests shall be performed on the actual assembled unit from shut-off head condition to 125 percent of the required maximum design capacity.

Prototype model tests will not be acceptable. Pumps and motors shall be factory-tested, as defined herein.
2 Factory Tests of Pumps: All pumps and motors of sizes 10 to 125 hp (inclusive) shall be factory-tested in accordance with the above specifications. Seven sets of certified test data shall be submitted to the Engineer. This data shall include, but not be limited to the following:
a. Hydrostatic test with data recorded.
b. Hydraulic test with a minimum of 5 readings between shutoff head and 125 percent of the maximum design capacity, recorded on data sheets as defined by the Hydraulic Institute, signed, dated, and certified.
c. Certification that the pump hp demand will not exceed the rated motor hp beyond the 1.0 service rating at any point on the curve.

C. Factory Tests of Motors: All motors of sizes 10 hp and larger, shall be assembled, tested, and certified at the factory and the working clearances checked to insure that all parts are properly fitted. The tests shall be in accordance with ANSI/IEEE 112 and ANSI/IEEE 115 standards, including heat run and efficiency tests. All computations shall be recorded and 7 certified and dated copies of the test results shall be furnished to the Engineer.

15.b
Packet Pg. 732 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PUMPS, GENERAL
CHLORINE CONVERSION PROJECT 11210-4
D. Acceptance: In the event of failure of any pump to meet any of the above requirements or efficiencies, the Contractor shall make all necessary modifications, repairs, or replacements to conform to the requirements of the Contract Documents and the pump shall be re-tested at no additional compensation, until found satisfactory.
1 Field Tests: All pumping units shall be field tested after installation, in accordance with the Contract Documents, to demonstrate satisfactory operation, without causing excessive noise, vibration, cavitation, and overheating of the bearings. The field testing shall be performed in the presence of an experienced field representative of the manufacturer of each major item of equipment, who shall supervise the following tasks and shall certify in writing that the equipment and controls have been properly installed, aligned, lubricated, adjusted, and readied for operation:
2 Start-up, check, and operate the equipment over the entire speed range.

The vibration shall be within the amplitude limits recommended in the Hydraulic Institute Standards and it shall be recorded at a minimum of 4 pumping conditions defined by the Engineer.
3 Pump performance shall be documented by obtaining concurrent readings, showing motor voltage, amperage, pump suction head, and pump discharge head, for at least 4 pumping conditions at each pump rpm. Each power lead to the motor shall be checked for proper current balance.
4 Bearing temperatures shall be determined by a contact-type thermometer. A running time of at least 20 minutes shall be maintained for this test, unless liquid volume available is insufficient for a complete test.
5 Electrical and instrumentation testing shall conform to applicable sections of these specifications.
6 The field-testing shall be witnessed by the Engineer. In the event any of the pumping equipment fails to meet the above test requirements, it shall be Modified and retested in accordance with the requirements of these specifications. The Contractor shall then certify in writing that the equipment has been satisfactorily tested, and that all final adjustments thereto have been made. Certification shall include date of final acceptance test, as well as a listing of all persons present during tests, and resulting test data. The costs of all work performed in this paragraph by factory-trained representatives shall be borne by the Contractor.

1.05 MANUFACTURER’S SERVICE REPRESENTATIVE
A. Erection and Startup Assistance: Service and instruction assistance by the manufacturer’s engineering representative for each pump 10 hp and larger shall be provided by the Contractor during the following periods:

15.b
Packet Pg. 733 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PUMPS, GENERAL
CHLORINE CONVERSION PROJECT 11210-5
1 During erection.
2 During startup.

B. Instruction of City’s Personnel: The Contractor shall provide for the services of a factory service representative to instruct the City’s personnel in the operation and maintenance of the equipment. This service shall consist of a one-day’s visit to the plant for each type of similar pumps.

1.06 GUARANTEES AND WARRANTIES
A. After completion, the Contractor shall furnish to the City the manufacturer’s written guarantees, that the pumping equipment will operate with the published efficiencies, heads, and flow ranges and meet these specifications. The Contractor shall also furnish the manufacturer’s warranties as published in its literature and as specified.

PART 2 PRODUCTS

2.01 GENERAL
A. The Contractor shall furnish and install only such pumping equipment as the designed single manufacturer certifies is suitable for use with it equipment and the service conditions.

B. All manufactured items provided under this Section shall be new, of current manufacture, and shall be the products of reputable manufacturers specializing in the manufacture of such products; such manufacturers shall have had previous experience in such manufacture and shall, upon request of the Engineer, furnish the names of not less than 5 successful installations of its equipment of comparable nature to that offered under this Contract.

C. All combinations of manufactured equipment that are provided under these specifications shall be entirely compatible, and the Contractor and the designated single manufacturer shall be responsible for the compatible and successful operation of the various components of the units conforming to specified requirements. Each unit of pumping equipment shall incorporate all basic mechanisms, coupling, electric motor or engine drive and unit mounting. All necessary mountings and appurtenances shall be included.

D. Where two or more units of the same type and/or size of pumping equipment are required, such units shall all be produced by the same manufacturer.

2.02 MATERIALS
A. All materials furnished, as part of the pumping equipment shall be suitable for its intended use and service. Materials not specifically called for shall be highgrade, standard commercial quality, free from all defects and imperfection that might affect the serviceability of the product for the purpose for which it is intended, and shall conform to the following requirements:

15.b
Packet Pg. 734 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PUMPS, GENERAL
CHLORINE CONVERSION PROJECT 11210-6
1 Cast iron pump casings and bowls shall be of close-grained gray cast iron, conforming to ASTM A48, or equal.
2 Bronze pump impellers shall conform to ASTM B62.
3 Stainless steel pump shafts shall be of Type 400, Series. Miscellaneous stainless steel parts shall be of Type 316 except in septic environment. 4 All anchor bolts, nuts and washers shall be type 316 stainless steel, unless otherwise specified in individual pumping equipment specifications. Buried or submerged bolts, nuts and washers shall be of stainless steel.

2.03 PUMP APPURTENANCES
A. Nameplates: Each pump shall be equipped with a stainless steel nameplate indicating rated head and flow, impeller size, pump speed, and manufacturer’s name and model number.

B. Solenoid Valves: The pump manufacturer shall furnish and install solenoid valves on the water or oil lubrication lines and on all cooling water lines.

Solenoid valve electrical rating shall be compatible with the motor control voltage and shall be furnished complete with all necessary conduit and wiring installation from control panel to solenoid.

C. Pressure Gauges
1 All pumps (except sample pumps, sump pumps, and vertical turbine pumps) shall be equipped with pressure gauges installed at pump suction and discharge lines. Pressure gauges shall be located in a representative location, where not subject to shock or vibrations, in order to achieve true and accurate readings.
2 Pump suctions shall be equipped with compound gages. Where subject to shock or vibrations, the pressure gages shall be provided with snubber and wall-mounted or attached to galvanized channel floor stands and connected by means of flexible connectors.
3 Variable Speed Drives: Variable speed drives, drive motors, speed control equipment, and accessories shall be furnished in accordance with applicable sections.

2.04 PUMP REQUIREMENTS – GENERAL
A. Flanges: Suction and discharge flanges shall conform to ANSI standard B16.1 or B16.5 dimensions.

B. Lubrication: Vertical pump shafts shall be product water-lubricated, unless otherwise specified. Deep-well pumps and pumps with dry barrels shall have water- or oil-lubricated bearings and seals.

15.b
Packet Pg. 735 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PUMPS, GENERAL
CHLORINE CONVERSION PROJECT 11210-7
C. Handholes: Handholes on pump casings shall be shaped to follow the contours of the casing to avoid any obstructions in the water passage.

D. Vortex Suppressors: Vertical pumps with insufficient submergence shall be furnished with vortex suppressors.

E. Drains: All gland seals, air valves, and cooling water drains, and drains from variable speed drive equipment shall be piped to the nearest floor sink, or drain, with galvanized steel pipe or copper tube, properly supported with brackets.

F. Stuffing Boxes: Where stuffing boxes are specified for the pump seal, they shall be of the best quality, using the manufacturer’s suggested materials best suited for the specific application. For sewage, sludge, drainage, and liquids containing sediments, the seals shall be fresh-water flushed, using lantern rings. If fresh water is not available, the seal shall be flushed with product water cleaned by means of a solids separator. Unless otherwise specified, the packing material shall be interlaced Teflon braiding, containing 50 percent ultra fine graphite impregnation to satisfy the following specification:
1 Shaft Speeds: up to 2,500 fpm
2 Temperature: up to 500 degrees F
3 H Range: 0 – 14
G. Mechanical Seals: Unless otherwise specified mechanical seal designs shall be selected for highest reliability and for rugged service. Mechanical seals shall be provided where called out, and they shall be water-flushed, unless otherwise specified. Water flushing shall be as described above. Unless the pump manufacturer recommends a better seal for a specific application, the following mechanical seals shall be furnished with the pumps:
1 Washwater Pumps: Double Seals
2 Chemicals, and Corrosive Liquid Pumps: Single Seals
3 Clean Water Pumps, Hot and Cold: Single Seals
H. For all seal arrangements, a buffer fluid must be circulated a minimum 20 psi above suction pressure, or as required by manufacturer, in order to maintain reliable seal performance.

I. Preferred seals for all services other than chemicals and corrosives should be equipped with non-clogging, single coil springs and non-sliding, internal, secondary elastomers. Metal parts are to be of 300 series, corrosion-resistant materials.

15.b
Packet Pg. 736 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PUMPS, GENERAL
CHLORINE CONVERSION PROJECT 11210-8
PART 3 EXECUTION

3.01 INSTALLATION
A. General: Pumping equipment shall be installed in accordance with approved procedures submitted with the shop drawings and as shown, unless otherwise approved by the Engineer.

B. Alignment: Equipment shall be field tested to verify proper alignment, operation as specified, and freedom from binding, scraping, vibration, shaft runout, or other defects. Pump drive shafts shall be measured just prior to assembly to ensure correct alignment. Equipment shall be secured in position and fixed neatly in appearance.

C. Lubricants: The installation work shall include furnishing the necessary oil and grease for initial operation.

3.02 PROTECTIVE COATING
A. All exposed materials, except corrosion-resistant metals which have not been shop painted, shall be field coated. Shop painted items which suffered damage to the shop coating shall be touched up.

END OF SECTION

15.b
Packet Pg. 737 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CHEMICAL FEED PUMP SKID
CHLORINE CONVERSION PROJECT 11240-1
SECTION 11240

CHEMICAL FEED PUMP SKID
PART 1 GENERAL

1.01 DESCRIPTION
A. Provide complete, tested and operating chemical feed pump skids as shown on the Drawings and as specified herein.

B. Related Sections

1. Installation, Testing, Commissioning and Training: 01660

2. Equipment General Provisions: 11000
C. Requirement: All materials in contact with chemical shall comply with ANSI/NSF61.

1.02 REFERENCES
A. California Building Code (CBC)
B. National Electrical Manufacturers Association (NEMA)

1.03 SUBMITTALS
A. Shop Drawings and Product Data: Submit the following as a complete initial submittal in accordance with Section 01300:

1. Product data to demonstrate that equipment conforms to the specifications.

2. Motor and pump data and dimensions.

3. Skid unit layouts and dimensions.

4. Pump performance data.

5. Materials of construction.

B. A copy of the Contract Document control diagrams and process and instrumentation diagrams that apply to the equipment in this Section marked to show specific changes necessary for the supplied equipment. If no changes are required, the drawing shall be marked “NO CHANGES REQUIRED”. Failure to include copies of the relevant drawings with the submittal shall be cause for rejection of the entire submittal with no further review.

C. A copy of this Section, with addendum updates included, and all referenced and applicable sections, with addendum updates included, with each paragraph checkmarked to indicate specification compliance or marked to indicate requested deviations from specification requirements. If deviations from the specifications are indicated and, therefore requested by the Contractor, the submittal shall be

15.b
Packet Pg. 738 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CHEMICAL FEED PUMP SKID
CHLORINE CONVERSION PROJECT 11240-2
accompanied by a detailed, written justification for each deviation. Failure to include a copy of the marked-up specification sections, along with justification for any requested deviations to the specification requirements, with the submittal shall be cause for rejection of the entire submittal with no further review.

D. Manuals: Furnish manufacturer's installation, lubrication, operation and maintenance manuals, bulletins, and spare parts lists for each system specified.

E. Material Safety Data Sheets (MSDS) for each chemical to be used during testing of each chemical feed system.

1.04 QUALITY ASSURANCE
A. All components and equipment shall be suitable for chemicals specified as follows in percentage by weight of solution (approximate) and peristaltic pump shall meet the operational flow range:

Chemical No. of Pump
Skid Unit
Flow
(gph)
Min.

Pressure
(psi)
Sodium Hypochlorite (12.5%) 5 28.5 50
PART 2 PRODUCTS

2.01 PERISTALTIC METERING PUMPS
A. Construction

1. The metering pump shall be a positive displacement, peristaltic type tubing pump with a brushless variable speed motor, non-spring loaded roller assembly located in the pump head, integral tube failure detection system, tube life roller revolution counter with user alarm set-point and flexible tubing with attached connection fittings.

2. The fluid path shall not have valves, diaphragms, springs, or dynamic seals and process fluid shall contact the pump tubing assembly and connection fittings only.

3. Pump shall be capable of 24-hour continuous duty, self-priming and operating in either direction of flow at the rated maximum pressure of up to 125 psi.

4. Pump shall be capable of running dry without damage and operating in either direction without output variation.

5. Suction lift shall be 30 feet of water.

6. Pump head shall be a single, unbroken track with a clear removable cover.

7. Tube failure detection sensors shall be wholly located in the pump head.

Tube failure detection system shall not trigger with water contact. Float type switches shall not be used. Process fluid waste ports or leak drains shall

15.b
Packet Pg. 739 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CHEMICAL FEED PUMP SKID
CHLORINE CONVERSION PROJECT 11240-3
not be provided.

8. Squeeze rollers with encapsulated ball bearings shall be directly coupled to a one piece thermoplastic rotor. Four polymeric rollers shall be provided; two squeeze rollers for tubing compression shall be located 180 degrees apart and two guide rollers that do not compress the tubing shall be located 180 degrees apart. Spring loaded or hinged rollers shall not be used.

9. Rotor assembly shall be installed on a D-shaped, chrome plated motor shaft and removable without tools.

10. For tubing installation and removal, rotor assembly shall be rotated by the motor drive at 6 RPM maximum when the pump head cover is removed.

Hand cranking of the rotor assembly shall not be required.

11. Pump head and tubing compression surface shall be corrosion resistant thermoplastic.

12. The pump head cover shall be clear, annealed acrylic thermoplastic with an integral ball bearing fitted to support the overhung load on the motor shaft. Cover shall include an imbedded magnetic safety interlock which will limit the motor rotation speed to 6 RPM when removed.

B. Drive

1. Drive system shall be factory installed and totally enclosed in a NEMA 4X wash-down enclosure. Capable of operating on any input power from 110VAC to 240VAC, 50/60 Hz single phase supply without user configuration or selection switches.

2. Motor shall be reversible, brushless DC gear motor rated for continuous duty. Motor shall include overload protection. The maximum gear motor RPM shall be 125 RPM.

3. Enclosure shall be rated NEMA 4X, and be pressure cast aluminum with acidic liquid iron phosphate three-stage clean and coat pretreatment and exterior grade corrosion resistant polyester polyurethane powder coat.

4. Enclosure shall be provided with 316SS floor/shelf level mounting brackets and hardware.

5. A wiring compartment shall be provided for connection of input/output signal wires and alarm output loads to un-pluggable type terminal block connectors. Terminal board shall be positively secured to the rear of the pump housing by two polymeric screws and fully enclosed by the wiring compartment cover.

6. All control circuitry shall be integral to the pump and capable of adjusting the pump motor speed with 10,000:1 turndown ratio. And, the pump output shall be capable of being manually controlled via front panel user touchpad controls. The pump motor speed shall be adjustable from 0.01 percent to 100.00 percent in 0.01 percent increments less than 1 percent motor speed

15.b
Packet Pg. 740 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CHEMICAL FEED PUMP SKID
CHLORINE CONVERSION PROJECT 11240-4
and in 0.1 percent increments greater than 1 percent motor speed.

7. The pump output shall be capable of being remotely controlled via 4-20mA analog input. The input resolution shall be 0.01 of input value and capable of adjusting the pump motor speed from 0 percent to 100.0 percent motor speed in 0.1 percent increments.

8. The pump output shall be capable of being remotely controlled via 0-10 VDC input. The input resolution shall be 0.01 of input value and capable of adjusting the pump motor speed from 0 percent to 100.0 percent motor speed in 0.1 percent increments. Four values shall be user configurable to define the low and high points on the output slope; a low input value, the required pump percentage of motor speed at the low input value, a high input value, the required pump percentage of motor speed at the high input value.

9. The pump output shall be capable of being remotely controlled via TTL/CMOS digital high speed pulse type input and an AC sine wave type pulse input in the range of 0 to 1000 Hz. And, the pump output shall be capable of being remotely controlled via pulse triggered batching.

10. The pump shall include an internal cycle timer capable of automatically cycling the pump on and off.

11. The pump shall be capable of dispensing upon demand. The dispensing shall be manually triggered by pressing the front panel start button or by inputting a contact closure. The pump shall be capable of automatically calculating the pump motor speed required to achieve a part per million dosing output that is proportional to a fixed system flow rate. The pump shall be capable of automatically calculating the pump motor speed required to achieve a part per million dosing output that is proportional to a variable system flow rate.

12. The pump shall be capable for remote stop/start pump via 6-30 VDC powered loop or non-powered contact closure loop and capable for a user selectable 4-20mA and 0-1000Hz output signal.

C. Pump Tube Assembly

1. To ensure pump performance and accuracy, only tubing provided by the manufacturer is acceptable. The manufacturer shall be responsible to select the tubing material to meet the chemical compatibility (Sodium Hypochlorite) and pump discharge pressure (Meet NSF61).

2. Pump tube shall be assembled to connection fittings of PVDF material.

3. Connection fittings shall be permanently clamped to the tubing with stainless steel clamps. To prevent tubing misalignment and ensure accuracy, fittings shall insert into keyed slots located in the pump head and secured in place by the pump head cover.

15.b
Packet Pg. 741 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CHEMICAL FEED PUMP SKID
CHLORINE CONVERSION PROJECT 11240-5

4. Provide quick disconnect fittings for ease of tube changing. The discharge and suction fittings shall have a built-in check valve.

D. Pump and skid manufacturer shall be Blue-White Industries, Ltd Model M4 or approved equal.

2.02 CHEMICAL FEED PUMP SKID AND ACCESSORIES
A. General: Materials of construction shall be satisfactory for continuous exposure to the herein before-listed chemical.

B. Pump Skid System: Pump skid system shall be constructed of lightweight, welded aluminum with acidic liquid iron phosphate coating and exterior grade corrosion resistant polyester polyurethane powder coat. The skid system shall permit the installation of metering pumps described in above section and skid accessories described in later section.

1. There shall two side walls, a pump mounting base, and two rear back plates. Each of the two side walls shall be provided with service access cutouts and accessory mounting slots.

2. Four 316 stainless steel skid mounting pads shall be provided which can be positioned to enable either floor mounting or wall mounting the skid.

Each mounting pad shall be secured to two mounting holes in the skid structure by stainless steel hardware.

3. Two 316 stainless steel pump mounting brackets with four mounting slots shall be provided. Pump mounting brackets shall be secured to the skid structure by stainless steel hardware.

4. Custom engineered universal mounting brackets shall secure each of the ball valves to the skid structure. Valve mounting brackets shall be PVC.

Valve mounting brackets shall be secured to pre-cut slots in the skid structure by stainless steel hardware.

5. A polypropylene drip tray shall be provided.

6. Piping shall be ½” diameter schedule 80 PVC or CPVC.

7. Vented ball valves shall be PVC with PTFE shaft bearings and seals.

8. Unions shall be schedule 80 PVC.

9. Seals may be specified as either Viton for sodium hypochlorite or EPDM for aqueous ammonia.

10. Two chemical inlet ports shall be provided.

C. Calibration Cylinders: Provide clear PVC graduated calibration cylinders. Provide anti-splash caps for each calibration cylinder. Install one calibration cylinder assemblies on suction side of metering pumps as shown on the Drawings.

15.b
Packet Pg. 742 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CHEMICAL FEED PUMP SKID
CHLORINE CONVERSION PROJECT 11240-6
D. Check Valves: Located in the discharge side of the piping to prevent the back flow of fluid through the system. Check valve shall be PVC with a 1 ~ 1.5 psi cracking pressure. The maximum inlet working pressure shall be 150 psi. Seals shall be either Viton or EPDM with Viton seals.

E. Pressure Relief Valves (PRV): Provide PRV on the discharge side of each pump to prevent excessive pressure in the system. Fluid shall be returned to the inlet side of the system if the pre-set maximum system pressure is exceeded. The PRV shall be PVC, CPVC with a PTFE diaphragm seal. The PRV shall have a convenient high density plastic pressure adjustment knob molded onto a stainless steel threaded shaft shall with a stainless steel lock nut. The PRV shall have infinite adjustment increments from 5 to 100 psi.

F. Inlet Y-strainer: Located in the suction side of the piping system. The Y-strainer shall be PVC with removable screen. Seals shall be either Viton or EPDM with Viton seals.

G. Pulsation Dampener: The dampener shall be PVC or CPVC with 10 cubic inches of volume for peristaltic pumps. A ball valve shall be provided to permit the dampener to be removed for service. Seals shall be Viton or EPDM with Viton seal.

H. Pressure Gauge and Guard: The liquid filled gauge shall be stainless steel and include a blow-out plug. The gauge shall be bottom mounted to the guard with 1/4” NPT stainless steel threads. The temperature compensated oil filled gauge guard shall be PVC with 1/2” socket weld bottom connection. Pressure gauge shall have

2.5" dial, stainless steel case and 316 stainless steel Internals with 1.6 percent accuracy.

I. Ultrasonic Flowmeter shall output high-speed 4-20mADC signal while the pump is running only to verify chemical injection. Ultrasonic flowmeter shall be manufactured by Blue-White. Wetted components shall be PVDF/PEEK. a. Flow range: 1.5 – 158.5 GPH.
b. Signal Output: 4 – 20 mADC
c. Relay Output: Form C Solid State Relay, 24VDC, Programmable. d. Display: Flow rate, flow total, chemical profile and meter status.

J. Flow Indicator: Located in the discharge side of the piping. The flow indicator shall be clear acrylic with ceramic ball and polypropylene ball stop. The flow indicator shall be secured to the piping system with PVC connectors and half unions.

2.03 SPARE PARTS
A. Furnish spare parts that are necessary for continued operation of the equipment and any special tools required for replacement of parts and adjustment of equipment.

1. Three (3) Pump Rotors

15.b
Packet Pg. 743 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CHEMICAL FEED PUMP SKID
CHLORINE CONVERSION PROJECT 11240-7

2. Ten (10) Pump Tubes

3. Six (6) Quick Disconnect Fittings (three for suction and three for discharge) PART 3 EXECUTION

3.01 INSTALLATION
A. General: The chemical feed system equipment shall be installed in strict conformance with the manufacturer's installation instructions and with favorably reviewed shop drawings. Check out of the final installation, startup, calibration and instruction of operating personnel shall be performed by an authorized representative of the manufacturer.

3.02 FIELD TESTING
A. Chemical feed system shall be tested for four hours with water. Chemical system shall be tested against a closed discharge solution line to test pressure relief valve operation. This shall be performed for each metering pump and shall be witnessed by the City (or City’s representative).

B. Only after satisfactory testing with water and complete draining and removal of water from the chemical system, and thorough drying, which may require blowing dry air through the pipelines, may the final test with chemical be allowed to proceed. After draining the test water, hand wipe, dry and blow dry air through chemical feed pipelines to leave the chemical pipelines clean, dry and ready for conveyance of the chemical; then test each chemical feed system in all operational and alarm modes to show conformance with these Specifications.

C. Provide sufficient chemical (approximately 20 gallons), for the test. The chemicals used shall be favorably reviewed by the City (or City’s representative) prior to the test. Each chemical metering pump shall be (chemical solution) calibrated and tested throughout its pumping range. The MSDS for each chemical shall be on hand during the testing of the chemical feed system.

D. The Contractor shall be responsible for the disposal of any unused test material(s).

3.03 FIELD SERVICES
A. Provide an Engineer or technician from the chemical feed equipment supplier(s) to make all adjustments and monitor the testing.

B. After successful completion of field testing, provide 2 days (16 hours) of additional service by an Engineer or technician from each equipment supplier to train City personnel in system operation, maintenance, and safety procedures.

END OF SECTION

15.b
Packet Pg. 744 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO CHEMICAL FEED PUMP SKID
CHLORINE CONVERSION PROJECT 11240-8
This Page Intentionally Left Blank

15.b
Packet Pg. 745 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO FIELD INSTRUMENTS AND ANALYTICAL INSTRUMENTS CHLORINE CONVERSION PROJECT 13430-1
SECTION 13430

FIELD INSTRUMENTS AND ANALYTICAL INSTRUMENTS
PART 1 GENERAL

1.01 REQUIREMENT
A. The Contractor shall furnish and install instruments and all appurtenant work, complete and operable in accordance with the requirements of the Contract Documents.

B. Requirement: All materials in contact with water shall comply with ANSI/NSF61.

1.02 RELATED WORK SPECIFIED ELSEWHERE
A. American National Standards Institute (ANSI)

1. ANSI B1.20.1, Pipe Threads, General Purpose (inch)

2. ANSI B16.5, Pipe Flanges and Flanged Fittings
B. Instrument Society of America (ISA)

1. ISA RP12.6, Installation of Intrinsically Safe Systems for Hazardous (Classified) Locations
C. National Electrical Manufactures Association (NEMA)

1. NEMA ICS 1, General Standards for Industrial Control and Systems

2. NEMA 250, Enclosures for Electrical Equipment (1000 Volts Maximum) D. National Fire Protection Association (NFPA)

1. NFPA 70, National Electrical Code (NEC)

1.03 SUBMITTALS
A. Submittals shall be submitted in accordance with Section 01300 of the main specifications.

B. Product Data

1. Performance data that will show compliance with specification requirements stated herein to include complete specifications, catalog cuts, and descriptive literature which shall include make, model, dimensions, and weights of equipment.

2. Suggested spare parts list.

15.b
Packet Pg. 746 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO FIELD INSTRUMENTS AND ANALYTICAL INSTRUMENTS CHLORINE CONVERSION PROJECT 13430-2

3. List of special tools, materials, and supplies furnished with equipment.

4. Special shipping, storage and protection, and handling instructions.

5. Routine maintenance requirements.

C. Shop Drawings

1. Shop drawings shall be submitted as detailed herein. They shall be complete; giving equipment specifications, details of connections, wiring, range and dimensions. Submittals consisting of only general sales literature will not be acceptable.

2. Installation or placing drawings for equipment and components.

3. Design calculations for equipment and equipment supports specified to be designed.

4. Wiring and control diagrams of systems and equipment.

5. Instrument installation drawings and schematics.

D. Operation and maintenance manuals shall be in accordance with Section 01300 of the main specifications.

1.04 QUALITY ASSURANCE
A. Qualifications: The manufacturer shall have designed and manufactured equipment which has been in successful operation for a period of not less than 5 years and which is comparable to the equipment required to be furnished.

B. Each instrument shall be successfully proven in applications similar to those where it is used on this project.

C. Experimental units or designs in their developmental stages are not acceptable.

D. Warranty

1. The Contractor shall furnish a written 1-year warranty to begin at the time of notification by the Engineer of satisfactory completion of the field test specified herein. The warranty shall apply to all instruments and controls.

The entire system shall be warranted against defects in materials and workmanship and against corrosion defects during the warranty period.

2. Repairs and/or replacement of defective instruments and materials during the warranty period shall be performed at no additional cost to the City.

1.05 DELIVERY, STORAGE AND HANDLING
A. The Contractor shall make suitable provision during delivery for handling all instruments on the site, and shall be especially careful to protect and preserve materials from the date of arrival until such material is incorporated in the finished

15.b
Packet Pg. 747 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO FIELD INSTRUMENTS AND ANALYTICAL INSTRUMENTS CHLORINE CONVERSION PROJECT 13430-3
installation, tested in accordance with the provisions of these specifications, and accepted by the Engineer.

B. Instruments shall not be stored outdoors, unless properly protected from damage. Instruments shall be adequately protected from damage. If the instruments is damaged, the Contractor shall replace the equipment or repair the damage. If Instruments has been subject to possible damage by dampness, it shall be thoroughly dried out and put through such tests as directed by the manufacturer. This shall be at the cost and expense of the Contractor, or the Contractor at its own expense shall replace the Instruments.

PART 2 PRODUCTS

2.01. GENERAL
A. Special tools, gauges, appurtenances, and accessories shall be provided by a complete and operable system. All instruments shall be suitable for operation over an ambient temperature range of 20º to 140º F. The Contractor shall provide the instrument lists and specific requirements (e.g., tag numbers, scale ranges, alarm settings, special features, etc.) for each instrument.

B. Wetted components of the instrument for each installation shall be made of materials that are abrasion-resistant and corrosion-resistant to aqueous ammonia and sodium hypochlorite as appropriate. The material shall exhibit excellent or good abrasion and corrosion resistance to the chemical in service as rated by the material manufacturer.

C. Level instruments shall measure, indicate and transmit the level of the liquids.

They shall not be affected by coating or build-up on the sensing element. Special installation tools, gauges, appurtenances, calibration units, stainless steel tubing, fittings and accessories shall be provided for a complete and operable system.

Two wire system transmitters shall be powered from a remote power supply. All material shall be suitable for a corrosive environment.

2.02. SPARE PARTS
A. The Contractor shall obtain and submit from the manufacturer a list of recommended spare parts for each piece of instruments according to the provisions of Operation and Maintenance Manuals of the General Requirements.

The Contractor shall also furnish the name, address, and telephone number of the nearest distributor for each piece of equipment.

1. During the term of this Contract the Contractor shall notify the Engineer in writing about any manufacturer’s modification of the identified spare parts, such as part number, interchangeability, model change or others.

2.03. ULTRASONIC LEVEL TRANSMITTER
A. The Ultrasonic level transmitter shall be Siemens Sitrans Probe LU240 or approved equal. The transmitter shall be 4- 20 mA loop powered for level and volume monitoring of liquids in open channels, storage vessels and simple

15.b
Packet Pg. 748 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO FIELD INSTRUMENTS AND ANALYTICAL INSTRUMENTS CHLORINE CONVERSION PROJECT 13430-4
process vessels. The sensor and electronics will be in one enclosure. The range of measurement shall range from 0 to 40 feet. The transducer on the sensor shall be ETFE or PVDF to suit the chemical application. The level transmitter shall incorporate an internal temperature sensor to compensate for temperature changes. The senor accuracy shall be +/- 0.02 mA of full scale. Contractor shall provide a level sensor connection to the tank, sump or wetwell with 2” NTP, flange connection, or mounting bracket per manufacturer’s recommendation.

2.04. ELECTRICAL DIGITAL INDICATOR
A. Electrical digital indicators shall be self-contained instruments that display process signals directly in engineering unit. The input signal to the digital indicator shall be 4-20 mA dc or 1-5 Vac. The minimum sample rate of the indicator shall be a minimum of 2 per second. The indicator shall include provisions for field adjustable scaling and/or offset. Accuracy shall be ±1 least significant digit. The digital indicator shall utilize 3.5 digits LED display of no less than 1-inch height. Input power to the digital indicator shall be 120 Vac, 60 Hz or 24VDC loop powered.

B. The electronic digital indicator shall be as manufactured by Precision Digital PD765, Digitec Corp., Model 4030, Action Instruments Co., Model V508-011- 014, or an approved equal.

2.05. FLOAT LEVEL SWITCHES (NOT USED)

2.06. PRESSURE GAUGES
A. Pressure gages shall be liquid filled 4 inches or 4.5 inches in diameter in a stainless steel weatherproof case. The dial shall be plastic coated with black figures on a white face. The scale shall have a 270-degree-minimum arc. The movement shall be stainless steel and nylon or all stainless steel, whichever is the manufacturer's standard. An over-range pressure of up to 130% of maximum scale reading shall not affect calibration of the gage. Accuracy shall be within

1.0% of scale range. Glycerine shall be the filling fluid and the window shall be acrylic. All pressure gages shall be provided with stainless-steel gage cocks and pulsation dampeners rated for at least 200 psi (discharge). The pressure gages shall be Ashcroft, Noshok or approved equal.

B. Provide with a ball valve between the gauge and the gauge tap for isolation purposes. All gauge tap locations shall be provided with a ½-inch female thread connection to receive the gauge. Provide reducers or increaser fittings if required to match the gauge provided.

C. Snubbers shall be provided for each gauge assembly as required.

2.07. PRESSURE SWITCHES (NOT USED)

2.08. PRESSURE TRANSMITTER (NOT USED)

2.09. FLOW SWITCH

15.b
Packet Pg. 749 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO FIELD INSTRUMENTS AND ANALYTICAL INSTRUMENTS CHLORINE CONVERSION PROJECT 13430-5
A. The flow switches for safety shower/eyewash shall have the following features. 1) DPDT switch contacts rated at 5 amperes at 120 Vac minimum. 2) Process connection of 1-inch NPT unless otherwise shown on the drawings. 3) Operating pressure and temperature limits of 200 psi at 500° F. 4) NEMA 250, Type 4 construction for all non-hazardous areas. The flow switches shall be manufactured by Haws SP154DPDT, Dwyer Series V6 Flotect or equal.

2.10. DIAPHRAGM SEAL
A. Whenever shown on the drawings, the Contractor shall furnish and install a diaphragm seal with the gauge or switch as one piece. Diaphragm seal shall be suitable for continuous duty and shall be factory filled, certified and shipped with the gauge or switch.

B. Where indicated on the drawings, diaphragm seals that are furnished and installed with remotely mounted gauges or switches shall be provided with armored stainless steel capillary tubing. Diaphragm shall be welded 316 Stainless Steel or recommended by manufacturer for chemical service. Both the upper and the lower housing shall be metal and the metal shall be 316 Stainless steel or recommended by manufacturer for chemical service. Gauge connection shall be 1/2 inch NPT female, the process connection shall match the pipe size, and the connection shall be matched with the piece of equipment. Flushing connections shall be provided. Filling fluid shall be Fluorolube, FS-5 or Halocarbon. Diaphragm Seals shall be Ashcroft Model 201, or equal.

2.11. CHLORINE RESIDUAL ANALYZER (NOT USED)
PART 3 EXECUTION

3.01. INSTALLATION
A. Instrumentation and accessory equipment shall be installed in accordance with the manufacturer's instructions and the Contract requirements. The locations of equipment, transmitters, alarms and similar devices are diagrammatic only.

Exact locations shall be as determined by the Contractor during design and fabrication of systems.

B. All instruments and control devices shall be installed with the manufacturer’s recommended clearances to accommodate servicing, maintaining, and calibrating activities by plant staff.

C. All indicating devices shall be installed in such a manner that they are visible from the normal traffic routes of the plant staff.

D. The P&IDs indicate the intent and not the precise nature of the interconnection between the individual instruments. Where indicated on the P&IDs or instrument list as not requiring installation, provide the instruments suitably packaged for storage.

E. Where specific installation details are not specified or shown on the drawings, installation recommendations from the API and equipment manufacturers shall be followed as applicable.

15.b
Packet Pg. 750 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO FIELD INSTRUMENTS AND ANALYTICAL INSTRUMENTS CHLORINE CONVERSION PROJECT 13430-6
F. All work shall be in strict accordance with codes and local rulings; should any work be performed contrary to said rulings, ordinances and regulations, the Contractor shall bear full responsibility for such violations and assume all costs arising therefrom.

G. Field instruments requiring power supplies shall be provided with local electrical shutoffs and fuses as required.

H. Brackets and hangers required for mounting of equipment shall be provided.

They shall be installed in a work-like manner and not interfere with any other equipment.

I. The shield on each process instrumentation cable shall be continuous from source to destination and be grounded as directed by the manufacturer of the instrumentation equipment but in no case shall more than one ground point be employed for each shield.

J. The Contractor shall certify that all field wiring for power and signal circuits are correctly done in accordance with best industry practice and provide for all necessary system grounding to insure a satisfactory functioning installation.

K. Material and Equipment Installation

1. The Contractor shall follow the manufacturer's printed installation recommendations. Wherever any conflict arises between the manufacturers' instructions, codes and regulations, and these specifications, the Engineer's decision shall be followed. A copy of manufacturers' installation instructions shall be kept on the work site, available for review at all times.

2. Basic electrical materials installation requirements shall be in accordance with Section 16050.

3.02. CALIBRATION, TESTING, PRE-COMMISSIONING, START-UP AND INSTRUCTION A. All instruments shall be installed, connected, calibrated and tested in accordance with Section 16080, Electrical Testing and Section 17405, Process Instrumentation and Control.

END OF SECTION

15.b
Packet Pg. 751 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO VERTICAL DOUBLE WALL STORAGE TANKS
CHLORINE CONVERSION PROJECT 13670-1
SECTION 13670

VERTICAL DOUBLE WALL STORAGE TANKS
PART 1 GENERAL

1.01 WORK OF THIS SECTION
A. This specification covers upright, double wall, flat bottom storage tank assemblies.

The assembly consists of one cylindrical inner primary tank and one blended form octagonal outer secondary tank. Each tank is molded in one-piece seamless construction by rotational molding (laminated or fabricated tanks will not be accepted). The tanks are designed for above-ground, vertical installation and are capable of containing sodium hypochlorite (12.5%) at atmospheric pressure. The design shall allow direct primary tank base retention for up to seismic conditions per IBC code requirements. The containment tank shall be designed to hold a minimum of 115% of the normal fill capacity of the primary tank. Included in this specification are requirements for material properties, design, construction, dimensions, tolerances, workmanship, and appearance.

B. The Contractor shall provide chemical tanks and appurtenances, complete, in accordance with the Contract Documents.

C. Unit Responsibility: The Contractor shall assign responsibility for furnishing the tank system as indicated to the tank manufacturer.

D. Requirement: All materials in contact with water or chemical shall comply with ANSI/NSF61.

1.02 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. Except as otherwise indicated, the current editions of the following commercial standards apply to the work of this Section:

1. Commercial Standards
CBC California Building Code Latest Edition
ARM Low Temperature Impact Resistance (Falling Dart Test Procedure)
ANSI B-16.5 Pipe Flanges and Flanged Fittings
OSHA 29 CFR 1910.106 Occupational Safety and Health
Administration, Flammable and Combustible Liquids
AWS B2.1 Welding Procedures and Performance Qualifications AWS QC1 Standard for AWS Certification of Welding Inspectors AWS D1.6 Structural Welding Code – Stainless Steel

15.b
Packet Pg. 752 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO VERTICAL DOUBLE WALL STORAGE TANKS
CHLORINE CONVERSION PROJECT 13670-2

2. ASTM Standards
D618 Conditioning Plastics and Electrical Insulating Materials for Testing
D638 Tensile Properties of Plastics
D790 Flexural Properties of Unreinforced and Reinforced Plastics and
Electrical Insulating Materials
D883 Definitions of Terms Relating to Plastics
D1505 Density of Plastics by the Density-Gradient Technique D1525 Test Method for Vicat Softening Temperature of Plastics D1693 Test Method for Environmental Stress-Cracking of
Ethylene Plastics
D1998 Standard Specification for Polyethylene Upright Storage Tanks
D2765 Degree of Crosslinking in Crosslinked Ethylene Plastics as Determined by Solvent Extraction
D2837 Method for Obtaining Hydrostatic Design Basis for Thermoplastic Pipe Materials
D3892 Practice for Packaging/Packing of Plastics
F412 Definitions of Terms Relating to Plastic Piping Systems

1.03 CONTRACTOR SUBMITTALS
A. Shop Drawings: Shop Drawings shall be submitted in accordance with Section 01300, Submittals.

B. Shop Drawings

1. Tank Material
a. Data sheet.
b. Information showing compatibility with chemical to be stored under the concentration and temperature conditions expected.
c. Gasket style and material.
d. Bolting material.

2. Dimensioned Tank Drawings
a. Location and orientation of openings, fittings, accessories, instrumentation, and anchors and supports.
b. Details of inlet and outlet fittings, manways, flexible connectors, and vents.
3 Calculations stamped and signed by a registered engineer and certified by the tank manufacturer.
a. Wall Thickness: Hoop stress shall be indicated.

15.b
Packet Pg. 753 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO VERTICAL DOUBLE WALL STORAGE TANKS
CHLORINE CONVERSION PROJECT 13670-3
b. Tank Restraint System: Show seismic and wind criteria. 4 Insulation data and name of insulation subcontractor.

C. Proposed manufacturer warranty.

D. Manufacturer’s written certification signed by a senior company officer stating that the tank design, type, and material is compatible with the indicated chemical to be stored in the tank.

E. Certification: After inspecting the installed tank, a representative of the manufacturer shall certify in writing that the tank has been installed in accordance with the manufacturer's recommendations. Certification shall be submitted to the Engineer.

1.04 QUALITY ASSURANCE
A. The tank shall be warranted for 5 years to be free of defects in material and workmanship.

PART 2 PRODUCTS

2.01 SODIUM HYPOCHLORITE STORAGE TANKS
A. Working Fluid: Sodium Hypochlorite (12.5%)
B. Specific Gravity: 1.9
C. Minimum Ambient Air Temperature: 35 F
D. Maximum Ambient Air Temperature: 100 F
E. Man-way: 18” PE Threaded/Vented, Top Mounted
F. Exposure UV Protection Required: No.

G. Tank Type: Flat bottom, domed top
H. Tank Fittings: Bolted 150 lb flange fitting with polyethylene encapsulated heads.

I. Gaskets shall be a minimum of 1/4" thickness and constructed of 60-70 durometer Viton.

J. The material used shall be virgin polyethylene resin as compounded and certified by the manufacturer.

K. All polyethylene resin material shall contain a minimum of a U.V. 8 stabilizer as compounded by the resin manufacturer. Pigments may be added at the purchaser's request, but shall not exceed 0.25% (dry blended) of the total weight.

L. HDLPE Resin shall meets ASTM standards table below;

15.b
Packet Pg. 754 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO VERTICAL DOUBLE WALL STORAGE TANKS
CHLORINE CONVERSION PROJECT 13670-4

PROPERTY ASTM VALUE
Density (Resin) D1505 0.941-0.950 g/cc
Tensile (Yield Stress 2"/min) D638 2800 - 3500 PSI
Elongation at Break (2"/min.) D638 >1000%
ESCR (100% Igepal, Cond. A, F50) D1693 >500 hours
ESCR (10% Igepal, Cond. A, F50) D1693 40 - 48 hours
Flexural Modulus 1% Secant D790B 130,000 – 145,000
PSI
M. Tank Size

1. 6,500 Gal Storage Tank: 10 ft Diameter (Max), 16.6 ft Height (Max) N. The tank shall be designed to provide tiedown/lifting lug 8 places and a minimum of 4 seismic restraint anchors. The anchor bolts shall be Titanium. The restraint anchors shall be designed to allow tank retention in seismic loading situations without tank damage.

O. All dimensions will be taken with the tank in the vertical position, unfilled. Tank dimensions will represent the exterior measurements.

1. The tolerance for the outside diameter, including out of roundness, shall be per ASTM D1998.

2. The tolerance for fitting placements shall be +/- 0.5 in. in elevation and 2 degrees radial at ambient temperature.

P. Tank Attachments

1. 2” Inlet

2. 2” Outlet

3. 2” Drain

4. 2” Overflow

5. 2” Vent

6. 2” Flexible couplers: The flexible connection is to be manufactured of the same material as the tank or a compatible material approved by Engineer.

If an elastomer flexible connection is used control bolts are required if recommended by the manufacturer. The flexible connection is to be designed for a minimum of 4% tank movement. The flexible connection is to be designed with 150# flange connections to allow for attachment to the

15.b
Packet Pg. 755 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO VERTICAL DOUBLE WALL STORAGE TANKS
CHLORINE CONVERSION PROJECT 13670-5
tank and the piping system. The flexible connection is to be attached as close as possible to the tank to reduce stress.

7. Ultrasonic Level Sensor: Refer to Section 13430 (Nozzle size shall be fit for ultrasonic level sensor)

8. Reverse float gauge:
a. The float level gage shall be constructed of a guided float on the inside of the tank connected to a weight indicator on the exterior of the tank with a 1/4" rope. The weighted indicator shall move along inside a clear guide pipe and may be equipped with an optional gallonage indicator board. The gallonage indicator board is made of PVC material and may be attached to the clear guide pipe. If specified the board shall be stenciled with one hundred gallon marks and labeled every five hundred gallons. The level gage shall be connected to the tank at an appropriate tank flat on the tank dome with a 3" threaded bulkhead fittings and held along the tank sidewall with appropriate 1" fittings and stand-off connections. b. The float level gage rigid components shall be constructed of PVC.

The rope shall be constructed of polypropylene or other specified material. Gaskets shall be constructed of Viton.

2.02 MANUFACTURERS
A. Products of the type or model (if any) indicated shall be manufactured by one of the following:

1. Sodium Hypochlorite Tanks
a. “SNYDER Industries, Inc.”
b. or equal

2.03 TANK STAND AND SEISMIC
A. The tank shall be provided on a concrete stand as shown on structural drawings.

The tank shall be secured with a restraint assembly connected to the concrete stand or footing.

B. Structural calculation including seismic analysis and tank anchor design shall be submitted by a California registered civil engineer with stamp.

PART 3 EXECUTION

3.01 INSTALLATION REQUIREMENTS
A. Installation shall be in accordance with the manufacturer's recommendations.

15.b
Packet Pg. 756 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO VERTICAL DOUBLE WALL STORAGE TANKS
CHLORINE CONVERSION PROJECT 13670-6

3.02 FIELD TESTING
A. After installation of tank and connections, the tank shall be water tested by filling the entire tank with water and monitoring the tank and connections for at least 24 hours. Leaks shall be corrected prior to acceptance. Following successful field testing, the tank shall be completely emptied and dried.

END OF SECTION

15.b
Packet Pg. 757 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING GENERAL
CHLORINE CONVERSION PROJECT 15000-1
SECTION 15000

PIPING, GENERAL
PART 1 GENERAL

1.01 THE REQUIREMENT
A. The Contractor shall provide the piping systems indicated, complete and operable, in accordance with the Contract Documents.

B. The provisions of this Section shall apply to piping sections in Divisions 2 and 15.

C. The mechanical drawings define the general layout, configuration, routing, method of support, pipe size, and pipe type. The mechanical drawings are not pipe construction or fabrication drawings. Where pipe supports and spacing are indicated on the drawings and are referenced to a Standard Detail, the Contractor shall use that Standard Detail. Where pipe supports are not indicated on the drawings, it is the Contractor's responsibility to develop the details necessary to design and construct mechanical piping systems to accommodate the specific equipment provided, and to provide spacers, adapters, and connectors for a complete and functional system.

1.02 CONTRACTOR SUBMITTALS
A. Furnish submittals in accordance with Section 01300.

B. Shop Drawings: Shop Drawings shall contain the following information:

1. Drawings: Layout drawings including necessary dimensions, details, pipe joints, fittings, specials, bolts and nuts, gaskets, valves, appurtenances, anchors, guides, and material lists. Fabrication drawings shall indicate spacers, adapters, connectors, fittings, and pipe supports to accommodate the equipment and valves in a complete and functional system.

2. Thermoplastic Pipe Joints: Submit solvent cement manufacturer's catalog indicating that the recommended product is suitable for each fluid service application.

3. Gasket Material: Submit gasket manufacturer's catalog indicating that the recommended product is suitable for each fluid service application.

4. Modular Seals for Pipe: Manufacturer’s catalog sheet showing materials and installation procedures.

C. Samples: Performing and paying for sampling and testing as necessary for certifications are the Contractor’s responsibility.

D. Certifications

15.b
Packet Pg. 758 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING GENERAL
CHLORINE CONVERSION PROJECT 15000-2

1. Necessary certificates, test reports, and affidavits of compliance shall be obtained by the Contractor.

2. A certification from the pipe fabricator that each pipe will be manufactured subject to the fabricator’s or a recognized Quality Control Program. An outline of the program shall be submitted to the Engineer for review prior to the manufacture of any pipe.

PART 2 PRODUCTS

2.01 GENERAL
A. Extent of Work: Pipes, fittings, and appurtenances shall be provided in accordance with the requirements of the applicable sections of Divisions 2 and 15 and as indicated. Materials in contact with potable water shall be listed as compliant with NSF Standard 61.

B. Pipe Supports: Pipes shall be adequately supported, restrained, and anchored, as indicated.

C. Coating: Application, thickness, and curing of coating on buried pipe shall be in accordance with the applicable sections of Division 15, unless otherwise indicated. Pipes above ground or in structures shall be coated per Engineer’s direction.

D. Tests: Except where otherwise indicated, materials used in the manufacture of the pipe shall be tested in accordance with the applicable specifications and standards. Welds shall be tested as indicated. The Contractor shall be responsible for performing material tests.

E. Welding Requirements: Qualification of welding procedures used to fabricate pipe shall be in accordance with the provisions of AWS D1.1, Structural Welding Code. Welding procedures shall be submitted for the Engineer's review.

F. Welder Qualifications: Welding shall be done by skilled welders and welding operators who have adequate experience in the methods and materials to be used. Welders shall be qualified under the provisions of AWS D1.1 or the ASME Boiler and Pressure Vessel Code, Section 9, by an independent local, approved testing City not more than 6 months prior to commencing work on the piping.

Machines and electrodes similar to those used in the work shall be used in qualification tests. Qualification testing of welders and materials used during testing is part of the work.

PART 3 EXECUTION

3.01 MATERIAL DELIVERY, STORAGE, AND PROTECTION
A. Piping materials, fittings, valves, and accessories shall be delivered in a clean and undamaged condition and stored off the ground for protection against oxidation caused by ground contact. Defective or damaged materials shall be replaced with new materials.

15.b
Packet Pg. 759 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING GENERAL
CHLORINE CONVERSION PROJECT 15000-3

3.02 GENERAL
A. Piping, fittings, and appurtenances shall be installed in accordance with the requirements of applicable sections of Division 2 and Division 15. Proprietary manufactured couplings shall be installed in accordance with the coupling manufacturer's recommendation.

B. Care shall be taken to ensure that piping flanges, mechanical-type couplings, sleeve-type couplings, flexible connectors, and expansion joints are properly installed as follows:

1. Gasket surfaces shall be carefully cleaned and inspected prior to making up the connection. Each gasket shall be centered properly on the contact surfaces.

2. Connections shall be installed to prevent inducing stress to the piping system or the equipment to which the piping is connected. Contact surfaces for flanges, couplings, and piping ends shall be aligned parallel, concentric, and square to each axis at the piping connections.

3. Bolts shall be initially hand-tightened with the piping connections properly aligned. Bolts shall be tightened with a torque wrench in a staggered sequence to the AISC recommended torque for the bolt material.

4. All bolts, nuts, and washers shall be Type 316 stainless steel.

5. After installation, joints shall meet the indicated leakage rate. Flanges shall not be deformed nor cracked.

C. Core Drilling: Where core drilling is required for pipes passing through existing concrete, core drilling locations shall be determined by radiograph of concrete construction to avoid damage to embedded raceways and reinforcing bars.

D. Cleanup: After completion of the work, cuttings, joining and wrapping materials, and other scattered debris shall be removed from the site. The entire piping system shall be handed over in a clean and functional condition.

END OF SECTION

15.b
Packet Pg. 760 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING GENERAL
CHLORINE CONVERSION PROJECT 15000-4
This Page Intentionally Left Blank

15.b
Packet Pg. 761 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING IDENTIFICATION AND SIGNAGE
CHLORINE CONVERSION PROJECT 15030-1
SECTION 15030

PIPING IDENTIFICATION AND SIGNAGE
PART 1 GENERAL

1.01 THE REQUIREMENT
A. The Contractor shall furnish, paint, mark, and paint/install identification devices for all exposed piping and piping in accessible chases and areas above ceilings with panels, and valves using, lettering, flow direction arrows, and related permanent identification devices, and all equipment, in accordance with the requirements of the Contract Documents.

1.02 RELATED WORK SPECIFIED ELSEWHERE
A. The requirements of the following sections and divisions apply to the work of this Section. Other sections and divisions of the Specifications, not referenced below, shall also apply to the extent required for proper performance of this work.

1. Division 11, Equipment, applicable sections

2. Division 15, Mechanical, applicable sections

3. Division 16, Electrical, applicable sections

1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. All work specified herein shall conform to or exceed the applicable requirements of the referenced portions of the following publications to the extent that the provisions thereof are not in conflict with other provisions of these Specifications.

B Comply with the applicable editions of the following codes, regulations, and standards.

1. Codes and Regulations
a. California Building Code (CBC), latest edition
b. National Fire Protection Association (NFPA)
c. Imperial County Fire Authority (OCFA)

2. Industry Standards: ASME A13.1 Scheme for the Identification of Piping Systems
C. Comply with the applicable reference Specifications as directed in the General Requirements and Additional General Requirements.

1.04 CONTRACTOR SUBMITTALS
A. Submittals shall be made in accordance with the General Requirements, Additional General Requirements and as specified herein.

15.b
Packet Pg. 762 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING IDENTIFICATION AND SIGNAGE
CHLORINE CONVERSION PROJECT 15030-2
B. The Contractor shall submit samples of all types of identification devices to be used in the work.

PART 2 PRODUCTS

2.01 WARNING TAPE FOR BURIED PIPE
A. The plastic warning tape shall be an inert plastic film specifically formulated for prolonged underground use.

B. The minimum thickness shall be 4 mils.

C. Overall width of the tape shall be 12 inches (for 8-inch and larger pipe) and 6 inches (for 6-inch and smaller pipe).

D. Lettering:

1. Potable Water: Blue background with the following words in black letters:
"CAUTION: POTABLE WATER-LINE BURIED BELOW".

2. Sewer: Green background with the following words in black letters:
"CAUTION: SEWER-LINE BURIED BELOW"

3. Sodium Hypochlorite: Yellow background with the following words in black letters: "CAUTION: SODIUM HYPOCHLORITE-LINE BURIED BELOW"

2.02 WARNING LABELS FOR EXPOSED PIPE AND APPURTENANCES
A. Labels shall be inert plastic film specifically formulated for prolonged exposure.

B. The minimum thickness shall be 4 mils for adhesive backed labels and 10 mils for tag type labels.

C. Tag type labels shall have reinforced tie holes and shall be attached with heavyduty nylon fasteners.

D. Provide with 1/2-inch high black letters (minimum):

1. Potable Water: Blue background with the following words in black letters:
"POTABLE WATER"

2. Drain: Yellow background with the following words in black letters: "DRAIN"

3. Ammonium Sulfate (Not Used)

4. Sodium Hypochlorite: Yellow background with the following words in black letters: " SODIUM HYPOCHLORITE "

5. Vent: Yellow background with the following words in black letters: "VENT"

6. Refrigerant: Yellow background with the following words in black letters: " REFRIGERANT"

15.b
Packet Pg. 763 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING IDENTIFICATION AND SIGNAGE
CHLORINE CONVERSION PROJECT 15030-3
E. The size and type of label will be dictated by each individual application and subject to acceptance by the City.

2.03 WITNESS MARKERS
A. Design:

1. High visibility

2. Equipped with a barb or other such device to secure marker in the surrounding soil
B. Materials: UV-resistant fiberglass.

2.04 EQUIPMENT SIGNAGE
A. Titles of equipment shall be provided in vinyl film as specified above on all equipment using 1-in high Optima Bold upper case, Grid 2 spacing, white or black in color as approved depending on substrate. Titles shall be mounted at eye level on equipment where possible or at the upper most broad vertical surface of low equipment. Where more than one piece of the equipment item to be titled exists, the items shall be numbered consecutively as indicated on the mechanical drawings or as directed by the Engineer.

B. Tanks used for chemical storage shall be identified using 4” high stenciled block letters directly applied to the tank surface. Contractor shall coordinate with tank manufacturer for appropriate paint type or vinyl film to be used on tank surface.

2.05 HAZARDOUS MATERIALS IDENTIFICATION SIGNS
A. Signs shall be 5-in by 5-in Style M19275 metal backed plastic, with 2-in pressure sensitive Style M3401 hazard numbers and Style M3406 symbols. Mount as specified for Restrictive Signs.

B. Signs shall conform to NFPA 704 for the identification of hazards identified by Materials Safety Data Sheets for process chemicals specified. Provide signs as directed, one for each chemical room.

2.06 RESTRICTIVE SIGNS/HAZARDOUS MATERIAL WARNING SIGNS A. Type 1: 4 mil, pressure sensitive vinyl with peel-off release paper for smooth metal and other non-gypsum, non-masonry, non-tile and non-concrete surfaces.

B. Type 2: 60 mil, polished vinyl, overcoated with Tedlar sheet with four mounting holes and rounded corners for other locations.

C. Print (permanent type as approved) all with required graphics and letters. Print under overcoat where such occurs.

D. Provide stainless steel fasteners and plastic drill-in anchors as required or stainless steel wire for fastening where each is ordered.

15.b
Packet Pg. 764 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING IDENTIFICATION AND SIGNAGE
CHLORINE CONVERSION PROJECT 15030-4
E. Restrictive signs shall conform to Cal/OSHA regulations for accident prevention and shall have square corners. Size of sign: 10-in high by 14-in. Provide 40 signs, text as directed, selected from standard “Danger”, “Caution”, “Notice”, and “Safety First” signs of the manufacturer.

F. Hazardous Materials Warning Signs – Same as above except special text as scheduled.

PART 3 EXECUTION

3.01 GENERAL
A. All labels shall be installed in accordance with the manufacturer's printed instructions, and shall be neat and uniform in appearance. All such tags or labels shall be readily visible from all normal working locations.

3.02 INSTALLATION OF PIPE WARING TAPE
A. Install warning tapes 12-inches above all pipe.

1. Longitudinally center over pipe.

2. Install warning tape continuously for the length of the pipe.

3.03 INSTALLATION OF WARNING LABELS
A. Install warning labels on all appurtenances in vaults, such as, but not limited to, air release valves, blow offs, and meters, and on designated facilities, such as, but not limited to, controller panels, wash down or blow off hydrants, on water trucks, and temporary construction services.

B. Location of labels will be dictated by each individual application and subject to acceptance by the City.

C. Firmly attach warning labels to all appurtenances using heavy-duty nylon fasteners.

D. Painted labels may, at the City discretion be acceptable in lieu of plastic labels.

3.04 INSTALLATION OF WITNESS MARKERS (UNPAVED AREAS)
A. Install witness markers over all pipe in unpaved areas and open space areas at intervals not greater than 200 feet.

B. Install witness markers at all appurtenances, including but not limited to valves, valve boxes, air release/vacuum breaks, dead ends, inflection points, and tees.

C. Witness markers shall be embedded into the soil at least 18-inches or as directed by manufacturer; the more stringent requirement shall apply.

15.b
Packet Pg. 765 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING IDENTIFICATION AND SIGNAGE
CHLORINE CONVERSION PROJECT 15030-5

3.05 SIGNAGE SCHEDULE
A. Provide signs at the locations and messages scheduled as shown in Table 1 – Signage Schedule
B. Provide additional signage as required by Local Fire Authority or Department.

TABLE 1 – SIGNAGE SCHEDULE
* Verify with Chemical Suppliers

END OF SECTION
Location and Signage
Recommendations Qty Size
NFPA
Ratings:

Fire,
Health,
Reactivity,
Special Placement Colors Material
Exising Chloirne Receiving & Storage Building and Chlorine Feed Room “CHEMICAL BUILDING –
SODIUM
HYPOCHLORITE INSIDE”
2 10”x14” Outside
Door Black/White Fiber Glass
“EXIT” 2 7”x10” Inside
Door Red/Yellow Polyester (Glow in dark)
“NO SMOKING WITHIN
25 FEET” 3 10”x14”
North,
East and
South
Walls
Red/White Fiber Glass
“CORROSIVE LIQUID” 1 10”x14”
North,
East and
South
Walls
Black/White Fiber Glass
NFPA Hazmat Diamond
Sign * 1 15”x15” 0,2,1 Per Tank Adhesive Vinyl

15.b
Packet Pg. 766 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING IDENTIFICATION AND SIGNAGE
CHLORINE CONVERSION PROJECT 15030-6
This Page Intentionally Left Blank

15.b
Packet Pg. 767 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING SYSTEMS
CHLORINE CONVERSION PROJECT 15050- 1
SECTION 15050

PIPING SYSTEMS
PART 1 GENERAL

1.01 Description
A. Scope: This Section specifies systems of process piping and general requirements for piping systems. Detailed specifications for the components listed on the Piping System Specification Sheets are found in other sections of Division 15. This Section shall be used in conjunction with those sections.

B. Definitions: Pressure terms used in this Section and elsewhere in Division 15 are defined as follows:

1. Maximum: The greatest continuous pressure at which the piping system operates.

2. Test: The hydrostatic pressure used to determine system acceptance.

1.02 Quality Assurance
A. References: This Section contains references to the following documents. They are a part of this Section as specified and modified. In case of conflict between the requirements of this Section and those of the listed documents, the requirements of this Section shall prevail.

Reference Title
ANSI A13.1 Scheme for the Identification of Piping Systems ANSI B1.20.1 Pipe Threads, General Purpose (Inch)
ANSI B16.1 Cast Iron Pipe Flanges and Flanged Fittings Class 25, 125, 250, and 800
ANSI B16.5 Pipe Flanges and Flanged Fittings
ANSI B16.22 Wrought Copper and Copper Alloy Solder Joint Pressure Fittings
ANSI B16.26 Cast Copper Alloy Fittings for Flared Copper Tubes ASTM A312/A312M Seamless and Welded Austenitic Stainless Steel Pipe ASTM A403/A403M Wrought Austenitic Stainless Steel Piping Fittings ASTM B88 Seamless Copper Water Tube
ASTM D1784 Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds
ASTM D1785 Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120
ASTM D2665 Poly (Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings
AWWA C105 Polyethylene Encasement for Ductile-Iron Piping for Water and Other Liquids
FEDSPEC L-C-530B Coating, Pipe, Thermoplastic Resin or Thermosetting Epoxy

15.b
Packet Pg. 768 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING SYSTEMS
CHLORINE CONVERSION PROJECT 15050- 2
Reference Title
MIL-STD-810C Environmental Test Methods
SAE J1227 Assessing Cleanliness of Hydraulic Fluid Power Components and Systems
UPC Uniform Plumbing Code
B. Fittings and Coupling Compatibility: To assure uniformity and compatibility of piping components, fittings and couplings for grooved end piping systems shall be furnished by the same manufacturers.

PART 2 PRODUCTS

2.01. Piping Materials
A. Unless otherwise specified, piping materials, including pipe, gaskets, fittings, connection and joint assemblies, linings and coatings, shall be selected from those listed on the piping system specification sheets. Piping materials shall conform to detailed specifications for each type of pipe and piping appurtenance specified in other sections of Division 15.

2.02 Piping Identification
A. Refer to Section 15030, Piping Identification and Signage.

2.03 Valves
A. Valves of the same size and service shall be provided by a single valve manufacturer. Packing shall be nonasbestos material. Actual length of valves shall be within 1/16 inch (plus or minus) of the manufacturer's specified length. Flanges shall meet the requirement of ANSI B16.5. Push-on and mechanical joints shall meet the requirements of AWWA C111.

2.04 Product Data
A. Product data on piping materials shall be provided in accordance with General Conditions, Article 9 and Special Conditions, Article 9 where specified.

PART 3 EXECUTION

3.01 Installation
A. Location: Piping shall be provided as specified except for adjustments to avoid architectural and structural features and shall be coordinated with electrical construction.

B. Piping Sizes: Where the size of piping is not specified, the Contractor shall provide piping of the sizes required by UPC. Unless specified otherwise, small piping (less than 1 inch in diameter) required for services not described by UPC shall be 1/2 inch.

15.b
Packet Pg. 769 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING SYSTEMS
CHLORINE CONVERSION PROJECT 15050- 3
C. Pipe Support, Anchorage and Seismic Bracing: Piping shall be supported by anchor brackets, guides, saddles or hangers. Acceptable types of supports, guides, saddles, hangers and structure attachments for general pipe support, expansion/contraction and for seismic bracing, as well as anchorage details, are shown on the drawings. Minimum spacing shall be as specified for supports and for seismic bracing. Where a specific type of support or anchorage is indicated on the drawings, then only that type shall be used there. Piping shall be vertically supported by anchor brackets, guides, saddles or hangers and shall be seismically braced where indicated to resist lateral load. Supports shall be provided on each run at each change of direction. Unless otherwise specified, existing pipes and supports shall not be used to support new piping.

D. Anchorage for Buried Piping: All plugs, caps, tees and bends in buried pressure piping systems shall be anchored by means of reaction backing or restrained joints as specified.

E. Bedding and Backfill: Bedding and backfill for buried piping shall be as specified.

3.02 Piping Identification
A. Refer to Section 15030, Piping Identification and Signage.

3.03 Testing
A. General

1. Upon completion of piping, but prior to application of insulation on exposed piping, the Contractor shall test the piping systems. Pressures, media and test durations shall be as specified in the PIPESPEC. Equipment which may be damaged by the specified test conditions shall be isolated. Testing shall be performed using calibrated test gages and calibrated volumetric measuring equipment to determine leakage rates. Each test gage shall be selected so that the specified test pressure falls within the upper half of the gage's range. Unless otherwise specified, the Contractor shall notify the Construction Manager 24 hours prior to each test.

2. Unless otherwise specified, testing, as specified herein, shall include existing piping systems which connect with new pipe systems. Existing pipe shall be tested to the nearest existing valve. Any piping which fails the test shall be repaired. Repair of existing piping will be considered and paid for as extra work.

B. Gas, Air and Vapor Systems

1. The Contractor shall test steam lines hydrostatically in accordance with the ASME procedure for testing pressure piping.

2. Unless otherwise specified, the testing medium for other gas, air and vapor systems shall be as follows:

15.b
Packet Pg. 770 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING SYSTEMS
CHLORINE CONVERSION PROJECT 15050- 4
Pipeline Size Specified Test Pressure Testing Medium
2 inch and smaller 75 psi or less Air or water
2 inch and smaller Greater than 75 psi Water
Greater than 2 inch 3 psi or less Air or water
Greater than 2 inch Greater than 3 psi Water

3. The allowable leakage rate for other systems tested with air shall be based on a maximum pressure drop of 5 percent of the specified test pressure for the duration of the period. Prior to starting a test interval using air, the air shall be at ambient temperature and specified test pressure.

C. Liquid Systems: Leakage shall be zero at the specified test pressure throughout the specified duration for the following systems: exposed piping, buried insulated piping, and buried or exposed piping carrying liquid chemicals.

D. Hydraulic and Lube Oil Systems: Upon completion of cleaning, all field connections shall be completed, and the system tested at the specified pressure. Pressure loss shall be zero for the specified test period. For fluid power systems, the manufacturer shall supervise the installation and testing of all system components including all field piping.

3.04 Cleaning and Flushing
A. General: Piping systems shall be cleaned following completion of testing and prior to connection to operating, control, regulating or instrumentation equipment. The Contractor may, at his option, clean and test sections of buried or exposed piping systems. Use of this procedure, however, will not waive the requirement for a full pressure test of the completed system. Unless specified otherwise, piping 24 inches in diameter and smaller shall first be cleaned by pulling a tightly fitting cleaning ball or swab through the system. Piping larger than 24 inches in diameter may be cleaned manually or with a cleaning ball or swab.

B. Temporary Screens: Upon completion of the cleaning, the Contractor shall connect the piping systems to related process equipment. Temporary screens, provided with locator tabs which remain visible from the outside when the screens are in place, shall be inserted in pipelines at the suction of pumps and compressors in accordance with the following table:

Equipment Suction or
Piping Size, Inches
Maximum Screen
Opening, Inches
0 - 1 1/16
1-1/4 - 3 1/4
3-1/2 - 6 1/2
Over 6 1

15.b
Packet Pg. 771 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING SYSTEMS
CHLORINE CONVERSION PROJECT 15050- 5
The Contractor shall maintain the screens during testing, initial start-up, and initial operating phases of the commissioning process. In special cases, screens may be removed as required for performance tests. The Contractor shall remove the temporary screens and make the final piping connections after the screens have remained clean for at least 24 consecutive hours of operation. Systems handling solids are exempted.

C. Gas and Air Systems: Unless otherwise specified, gas and air system piping 6 inches in diameter and smaller shall be blown out, using air or the testing medium specified. Piping larger than 6 inches shall be cleaned by having a swab or "pig" drawn through the separate reaches of pipe. After connection to the equipment, it shall then be blown out using the equipment. Upon completion of cleaning, the piping shall be drained and dried with an air stream.

D. Liquid Systems: After completion of cleaning, liquid systems, unless otherwise specified, shall be flushed with clean water. With temporary screens in place, the liquid shall be circulated through the piping system using connected equipment for a minimum period of 15 minutes and until no debris is collected on the screens.

E. Hydraulic and Fluid Power Oil Systems: (Not Used).

F. Potable Water Systems: Potable water piping systems shall be flushed and disinfected in accordance with AWWA C651.

3.05 Piping Services
Piping and valves for groupings of similar plant processes or types of service lines are specified on individual piping specification sheets (PIPESPECS) in Section 3.F.

Piping services are grouped according to the chemical and physical properties of the fluid conveyed and/or by the temperature or pressure requirements. Each grouping of services (PIPESPEC) is identified by a piping system number. Piping services specified in the PIPESPECS and on the drawings are alphabetically arranged by designated service symbols as shown in Table A. Table A also indicates the system number, fluid category, and symbol.

Table A – Piping Services
Symbol Service System Fluid
Category
PW Potable Water, Sample
Water 14 Water
SH Sodium Hypochlorite 20 Chemical

15.b
Packet Pg. 772 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING SYSTEMS
CHLORINE CONVERSION PROJECT 15050- 6

3.06 Piping Specification Sheet - PIPESPEC
SYSTEM 14
Piping Symbol/Service: PW – Potable Water
Chemical Containment Pipe for Sodium Hypochlorite PE Tubing Test Requirements:

Medium: Water for PW Pipe, Air for Chemical Containment Pipe Pressure: 150 psig for Water Pipe, for 5 psig for Chemical Containment Pipe Duration: 4 hours
Gasket Requirements:

Refer to Section 15085, Piping Connections
Exposed Pipe and Valves:
(See drawings for pipe size and valve type)
(All sizes)
Pipe: PVC; ASTM D1784, Class 12454-B, NSF certified, ASTM D 1785, Sch. 80. Pipe and fittings exposed to sunlight shall be painted. Ref.

Spec. Section 15064. Conn; plain end, solvent weld, flanged for valves 3 inch and larger. Ftgs; PVC, Sch. 80, solvent weld. (4" and less)
Valves: Ball valve and check valve Ref. Spec. Section 15204 Buried Pipe and Valves:
(See drawings for pipe size and valve type)
(All sizes)
Pipe: PVC; ASTM D1784, Class 12454-B, NSF certified, ASTM D1785, Sch. 80. Pipe and fittings exposed to sunlight shall be painted. Ref.

Spec. Section 15064. Conn; plain end, solvent weld, flanged for valves 3 inch and larger. Ftgs; PVC, Sch. 80, solvent weld. (All sizes)
Valves: Gate valve; same as exposed with extension stem and valve box.

15.b
Packet Pg. 773 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING SYSTEMS
CHLORINE CONVERSION PROJECT 15050- 7
System 20
Piping Symbol/Service: SH – Sodium Hypochlorite
Test Requirements:

Medium: Water
Pressure: 100 psig for PVC and CPVC; 75 psig for PE
Duration: 4 hours
Gasket Requirements:

Flange: TFE bonded EPDM, full-face gaskets, ANSI B16.1, Garlock Gylon 3504, or equal
Push-on/Mech Cpl: N/A
Exposed Pipe and Valves:
(See drawings for pipe size and valve type)
(All sizes)
Pipe: PVC; ASTM D1784, Class 12454-B, NSF certified, ASTM D 1785, Sch. 80. Pipe and fittings exposed to sunlight shall be painted. Ref.

Spec. Section 15064. Conn; plain end, solvent weld, flanged for valves 3 inch and larger. Ftgs; PVC, Sch. 80, solvent weld.

PE: ASTM D1248, Type I. No paint. Ref. Spec. Section 15064.

Conn: PE or PTFE compression type.
(4" and less)
Valves: Ball valve and check valve Ref. Spec. Section 15204.

Buried Pipe and Valves:
(See drawings for pipe size and valve type)
(All sizes)
Pipe: PVC; same as exposed.

Conn; same as exposed.

Ftgs; same as exposed.

PE; same as exposed.
(All sizes)
Valves: Gate valve; same as exposed with extension stem and valve box.

END OF SECTION

15.b
Packet Pg. 774 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING SYSTEMS
CHLORINE CONVERSION PROJECT 15050- 8
This Page Intentionally Left Blank

15.b
Packet Pg. 775 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PLASTIC PIPE
CHLORINE CONVERSION PROJECT 1506- 1
SECTION 15064

PLASTIC PIPE
PART 1 GENERAL

1.01 DESCRIPTION
A. Scope: This Section specifies polyvinylchloride, chlorinated polyvinylchloride, polyethylene, and polypropylene pipe and fittings.

B. Pipe Designations: For use in the Piping System Specification Sheets (PIPESPEC) in Section 15050, Pipe Systems and in this Section, the following plastic pipe designations are defined:

Designation Definition
PVC Polyvinylchloride
CPVC Chlorinated polyvinylchloride
PE Polyethylene
C. Requirement: All materials in contact with water shall comply with ANSI/NSF61.

1.02 QUALITY ASSURANCE
A. References: This Section contains references to the following documents. They are a part of this Section as specified and modified. In case of conflict between the requirements of this Section and those of the listed documents, the requirements of this Section shall prevail.

Reference Title
ASTM D1248-84 Polyethylene Plastics Molding and Extrusion Materials ASTM D1784-90 Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds
ASTM D1785-89 Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120
ASTM D2241-89 Poly (Vinyl Chloride) (PVC) Plastic Pipe (SDR-PR) ASTM D2464-90 Threaded Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
ASTM D2466-90 Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 40 ASTM D2467-90 Socket-Type Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80
ASTM D2564-88 Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Pipe and Fittings
ASTM D2657-90 Heat-Joining Polyolefin Pipe and Fittings ASTM D2665-89a Poly (Vinyl Chloride) (PVC) Plastic Drain, Waste, and Vent Pipe and Fittings
ASTM D3034-89 Type PSM Poly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings

15.b
Packet Pg. 776 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PLASTIC PIPE
CHLORINE CONVERSION PROJECT 1506- 2
Reference Title
ASTM D3295-15 Standard Specification for PTFE Tubing, Miniature Beading and Spiral Cut Tubing
ASTM F402-88 Safe Handling of Solvent Cements and Primers Used for Joining Thermoplastic Pipe and Fittings
ASTM F437-89a Threaded Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80
ASTM F438-90 Socket-Type Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 40
ASTM F439-90 Socket-Type Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe Fittings, Schedule 80
ASTM F441-89 Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe, Schedules 40 and 80
ASTM F477-76 Elastomeric Seals (Gaskets) for Joining Plastic Pipe ASTM F493-89 Solvent Cements for Chlorinated Poly (Vinyl Chloride) (CPVC) Plastic Pipe and Fittings
AWWA C900 Polyvinyl Chloride (PVC) Pressure Pipe and Fabricated Fittings, 4-inch through 12-inch, for Water Distribution PART 2 PRODUCTS

2.01 PVC PIPE
A. Pressure Pipe: PVC material for pipe and fittings shall conform to ASTM D1784.

Class 12454-B. Pipe and fittings shall be in accordance with ASTM D1785.

Schedule 80 PVC socket type fittings shall conform to ASTM D2467. PVC solvent weld cement for socket connections shall meet the requirements of ASTM D2564.

Schedule 80 PVC threaded fittings shall conform to ASTM D2464. Fittings for gasketed pipe shall be ductile iron or steel push-on IPS-sized pressure fittings rated for use with the specified class of PVC pipe.

B. Non-pressure Pipe (Drain, Waste, and Vent Pipe): PVC material for drain waste and vent (DWV) pipe and fittings shall conform to Class 12454-B, ASTM D1784.

Pipe and fittings shall conform to ASTM D2665. Unless otherwise specified, connections shall be solvent weld. Connections to traps, closet flanges, and nonplastic pipe shall be with approved adapter type fittings designed for intended use.

Solvent weld cement for socket connections shall meet requirements of ASTM D2564:

2.02 CPVC PIPE
A. CPVC material for pipe and fittings shall conform to ASTM D1784, Class 23447-B.

Pipe and fittings shall be in accordance with ASTM F441. Schedule 80 CPVC socket type fittings shall conform to ASTM F439. CPVC solvent weld cement for socket connections shall meet the requirements of ASTM F493. Schedule 80 CPVC threaded type fittings shall conform to ASTM F437. Fittings for gasketed pipe shall be ductile iron or steel push-on IPS-sized pressure fittings rated for use with the specified class of CPVC pipe.

15.b
Packet Pg. 777 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PLASTIC PIPE
CHLORINE CONVERSION PROJECT 1506- 3

2.03 PE PIPE (NOT USED)

2.04 PE TUBING AND PVC OR CPVC DOUBLE WALL PIPE AND FITTINGS A. PE Carrier Tubing and Fittings

1. PE tubing shall be 1/2” OD as shown on plans, minimum 1/16” wall thickness, conforming to the requirements of ASTM D1248, Type I fractional inch sizes, Class A chemical tubing. Working pressure shall be minimum 100 psi at 73ºF.

2. Tube fittings shall be PE compression type and material shall be PE body, PE ferrule or PTFE body, PTFE ferrule.

B. PVC or CPVC Containment Pipe and Fittings

1. Refer to Section 15064, Part 2 2.01 and 2.02.

2.05 LOCATOR WIRE
A. No. 10 AWG copper wire with insulating suitable for direct burial.

B. The insulation shall be blue for potable water and yellow for chemical lines.

2.06. PRODUCT DATA
A. The following information shall be provided in accordance with General Conditions, Article 9 and Special Conditions, Article 9, Submittals:

1. Manufacturer's certificates of compliance with the specified standards and Contractor's layout drawings.

PART 3 EXECUTION

3.01 INSTALLATION
A. Unless otherwise specified, PVC and CPVC piping exposed to sunlight shall be painted per Engineer’s direction.

B. Connections to different types of pipe shall be by means of flanges, specified adapters or transition fittings. Where sleeve type couplings are used, both shall be uniformly torqued in accordance with pipe manufacturer's recommendation.

Foreign material shall be removed from the pipe interior prior to assembly.

C. All connecting parts of pipe, rings, couplings, and castings shall be cleaned before assembly. After bearing has been obtained, couplings shall be assembled in a proper manner (as determined by the City). The use of excessive lubricant will not be permitted, and the assembly of the couplings and rings shall be in accordance with the manufacturer's recommendations. Lubricant and rubber rings shall be

15.b
Packet Pg. 778 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PLASTIC PIPE
CHLORINE CONVERSION PROJECT 1506- 4
supplied by the pipe manufacturer. All fittings and valves shall have joints that match the type of adjoining pipe
D. Install #10 AWG copper wire with insulating suitable for direct burial over the top of the pipe as shown on the Drawings. The wire shall not be spliced at any point and shall be continuous from riser to riser. The wire shall be brought to the surface at valve locations and shall be accessible by removing the valve can cover. The wire shall be brought up the outside of the valve well and folded over between the inside of the valve can and the valve well. The wire shall be brought to within 6 inches of finish grade.

END OF SECTION

15.b
Packet Pg. 779 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING CONNECTIONS
CHLORINE CONVERSION PROJECT 15085- 1
SECTION 15085

PIPING CONNECTIONS
PART 1 GENERAL

1.01 DESCRIPTION
A. This Section specifies the following methods of connecting metallic piping:
flanges, threading, mechanical couplings, dielectric unions, and welding.

B. Requirement: All materials in contact with water shall comply with ANSI/NSF61.

1.02 REFERENCES
A. This Section contains references to the following documents. They are a part of this Section as specified and modified. In case of conflict between the requirements of this Section and the listed documents, the requirements of this Section shall prevail.

Reference Title
ANSI B16.5 Pipe Flanges and Flanged Fittings
ANSI B18.2.1 Square and Hex Bolts and Screws Inch Series ANSI B18.2.2 Square and Hex Nuts (Inch Series)
ANSI B31.1 Power Piping
ANSI B31.3 Chemical Plant and Petroleum Refinery Piping ASTM F37 Standard Test Methods for Sealability of Gasket Materials ASTM F104 Standard Classification System for Nonmetallic Gasket Materials
ASTM F152 Standard Test Methods for Tension Testing of Nonmetallic Gasket Materials
ASTM F593 Stainless Steel Bolts, Hex Cap Screws, and Studs ASTM F594 Stainless Steel Nuts
AWWA C206 Field Welding of Steel Water Pipe
AWWA C207 Steel Pipe Flanges for Waterworks Service-Size 4 in.

Through 144 in.

AWWA Mll Steel Pipe-A Guide for Design and Installation ANSI/NSF 61 NSF 61 Certified Materials that are in contact with water PART 2 PRODUCTS

2.01 FLANGE ASSEMBLIES
A. Flanges: Cast iron flanges shall be faced in accordance with ANSI B16.1.

Where companion flanges are used, the flanges on pipe shall be refaced to be flush with the companion flange face. Class 150 and Class 300 forged steel flanges shall be raised face conforming to ANSI B16.5. Lightweight slip-on flanges shall be plain face conforming to AWWA C207, Class B and ANSI B16.5.

15.b
Packet Pg. 780 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING CONNECTIONS
CHLORINE CONVERSION PROJECT 15085- 2
Unless otherwise specified, steel flanges shall be ANSI B16.5, Class 150 or AWWA C207, Class D. Class E AWWA flanges shall be provided where test pressure exceeds 175 psi. Plain faced flanges shall not be bolted to raised face flanges.

B. Flange Gaskets: Gaskets for flanged joints used in general water and wastewater service shall be full-faced type, with material and thickness in accordance with AWWA C207. Blind flanges shall have gaskets covering the entire inside face of the blind flange and shall be cemented to the blind flange.

Ring gaskets shall not be permitted unless otherwise indicated.

C. Gaskets for flanges for PVC and CPVC piping used in general water and wastewater service shall be full faced, 1/8-inch thick, made of EPDM in accordance with ASTM D 2240. When the mating flange has a raised face, provide a flat ring gasket filler between the PVC flange and gasket and the adjacent flange
D. Gaskets for flanged joints used in chemicals, air, solvents, hydrocarbons, steam, chlorine and other fluids shall be made of materials compatible with the service, pressure, and temperature
E. Bolts and nuts shall be made of Type 316 stainless steel in conformance with ASTM F593F and ASTM F594F.

2.02 MECHANICAL COUPLINGS
A. Sleeve-Type Couplings

1. Unless otherwise specified, sleeve-type mechanical pipe couplings shall be Smith-Blair Type 411, Dresser Style 38, or equal, with the stop removed from the middle ring. Long sleeve-type mechanical pipe couplings shall be Smith-Blair Type 462, Dresser Style 40, or equal.

Reducing couplings shall be Smith-Blair Type 415, Dresser Style 62, or equal. Sleeve-type flanged coupling adapters shall be Smith-Blair Type 913, Dresser Style 128, or equal. Insulating couplings shall be SmithBlair Type 416, Dresser Style 39, or equal.

2. Bolts and nuts shall be made of Type 316 stainless steel in conformance with ASTM F593F and ASTM F594F.

3. Gaskets for sleeve-type couplings shall be rubber-compound material that will not deteriorate from age or exposure to air under normal storage or use conditions.

4. The gaskets shall be immune to attack by impurities normally found in water or wastewater. Gaskets shall meet the requirements of ASTM D 2000 - Classification System for Rubber Products in Automotive Applications, AA709Z, meeting Suffix B13 Grade 3, except as noted above. Where sleeve couplings are used in water containing chloramine

15.b
Packet Pg. 781 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING CONNECTIONS
CHLORINE CONVERSION PROJECT 15085- 3
or other fluids which attack rubber materials, gasket material shall be compatible with the piping service and fluid utilized.

B. Plain End Couplings

1. Plain end pipe couplings for pipe sizes 6 inches and smaller shall be Gustin-Bacon 200, Victaulic Style 99, or equal for Schedule 80 pipe and Gustin-Bacon 205, Victaulic Style 90, or equal for lighter weight pipe.

Plain end couplings for pipe sizes 8 inches and larger shall be GustinBacon 200, Victaulic Style 99, or equal. Unless otherwise specified, bolts and nuts shall comply with AWWA C606.

2.03 EXPANSION JOINT
A. Expansion Joint shall be double arch, EPDM liner and cover, and Garlock Style 204 or equal.

2.04 GASKETS
A. Gaskets designated in Section 15050 shall be as follows:

1. EPDM: Ethylene-propylene-diene-terpolymer.

2. Neoprene: Neoprene.

3. Nitrile: Nitrile (Buna N).

4. Compressed gasketing consisting of organic fibers (Kevlar) and neoprene binder; ASTM F104 (F712400), 2500 psi (ASTM F152), 0.2 ML/HR LEAKAGE FUEL A (ASTM F37).

5. Compressed gasketing consisting of organic fibers (Kevlar) and SBR binder; ASTM F104 (F712400), 2500 PSI (ASTM F152), 0.1 ml/hr leakage Fuel A (ASTM F37).

6. Gylon gasketing, Garlock Style 3500, 2000 psi (ASTM F152), 0.22 ml/hr Fuel A (ASTM F37).

7. Gylon gasketing, Garlock Style 3510, 2000 psi (ASTM F152), 0.04 ml/hr Fuel A (ASTM F37).

8. Gylon gasketing, Garlock Style 3504, 2000 psi (ASTM F152), 0.12 ml/hr Fuel A (ASTM F37).

9. TFE: Noncreeping tetrafluoroethylene (TFE) with insert filler.

10. TFE Bonded EPDM: TFE bonded to EPDM in full-face gasket having concentric-convex molded rings.

2.05 THREAD

15.b
Packet Pg. 782 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING CONNECTIONS
CHLORINE CONVERSION PROJECT 15085- 4
A. Pipe thread dimensions and size limits shall conform to ANSI Bl.20.1.

2.06 DIELECTRIC UNIONS
A. Dielectric unions shall be EPCO, Capital, or equal.

2.07 COATINGS
A. Unless otherwise specified, flange assemblies and mechanical type couplings for buried installation shall be PVC tape wrapped. Prior to tape wrapping, the fittings shall be primed using a primer recommended by the PVC tape manufacturer.

After priming the fittings shall be wrapped with 20-mil adhesive PVC tape to a total thickness of 40-mils.

2.08 PRODUCT DATA
A. In accordance with General Conditions, Article 9 and Special Conditions, Article 9, the Contractor shall provide for each welder, a welder qualification certificate indicating the welder is certified for pipe welding in accordance with ASME. Each welder's certificate shall be provided to the Construction Manager prior to that welder working on the job.

PART 3 EXECUTION

3.01 PIPE CUTTING, THREADING AND JOINTING
A. Pipe cutting, threading and jointing shall conform to the requirements of ANSI B31.1.

3.02 PIPE WELDING
A. Pipe shall be welded by ASME-certified welders using shielded metal arc, gas shielded arc or submerged arc welding methods. Welds shall be made in accordance with the requirements of ANSI B31 for chemical piping.

B. Welds for water piping systems shall be made in accordance with AWWA C206.

3.03 TAKEDOWN COUPLINGS
A. Takedown couplings shall be screw unions, flanged or grooved end mechanical coupling type joints and shall be provided as specified. Flanged or grooved end joints shall be employed on pipelines 2-1/2 inches in diameter and larger. Where piping passes through walls, takedown couplings shall be provided within 3 feet of the wall, unless specified otherwise.

B. A union or flanged connection shall be provided within 2 feet of each threaded end valve.

3.04 FLEXIBILITY

15.b
Packet Pg. 783 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING CONNECTIONS
CHLORINE CONVERSION PROJECT 15085- 5
A. Unless otherwise specified, piping 2 inches in diameter and larger passing from concrete to earth shall be provided with two pipe couplings or flexible joints as specified within 2 feet or one pipe diameter of the structure, whichever is greater.

Where required for resistance to pressure, mechanical couplings shall be restrained in accordance with AWWA Mll, Paragraph 13.10, Tables 13-6 and 13- 7, and Figure 13-17.

END OF SECTION

15.b
Packet Pg. 784 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PIPING CONNECTIONS
CHLORINE CONVERSION PROJECT 15085- 6
This Page Intentionally Left Blank

15.b
Packet Pg. 785 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO VALVES, GENERAL
CHLORINE CONVERSION PROJECT 15200- 1
SECTION 15200

VALVES, GENERAL
PART 1 GENERAL

1.01 DESCRIPTION
A. The Contractor shall furnish and install all valves, actuators, and appurtenances, complete and operable, in accordance with the Contract Documents.

B. The requirements of Section 11000, apply to the work of this Section.

C. The provisions of this Section shall apply to valves and valve actuators except where otherwise indicated. Valves and actuators in particular locations may require a combination of units, sensors, limit switches, and controls indicated in other sections of the foundation specifications.

D. Where a valve is to be supported by means other than the piping to which it is attached, the Contractor shall obtain from the valve manufacturer a design for support and that satisfies the criteria in Section 11000. The design, including drawings and calculations sealed by an engineer, shall be submitted with the shop drawings. When the design is approved, the support shall be provided.

E. Unit Responsibility: A single manufacturer shall be made responsible for coordination of design, assembly, testing, and furnishing each valve; however, the Contractor shall be responsible to the City for compliance with the requirements of each valve section. Unless indicated otherwise, the responsible manufacturer shall be the manufacturer of the valve.

F. Single Manufacturer: Where 2 or more valves of the same type and size are required, the valves shall be furnished by the same manufacturer.

G. Requirement: All materials in contact with water shall comply with ANSI/NSF61.

1.02 CONTRACTOR SUBMITTALS
A. Submittals shall be in accordance with the requirements of Section 01300.

B. Shop Drawings: Shop drawings shall contain the following information:

1. Valve name, size, Cv factor, pressure rating, identification number (if any), and specification section number.

2. Complete information on valve actuator, including size, manufacturer, model number, limit switches, and mounting.

3. Cavitation limits for control valves.

15.b
Packet Pg. 786 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO VALVES, GENERAL
CHLORINE CONVERSION PROJECT 15200- 2

4. Assembly drawings showing part nomenclature, materials, dimensions, weights, and relationships of valve handles, handwheels, position indicators, limit switches, integral control systems, needle valves, and control systems.

5. Complete wiring diagrams and control system schematics.

6. Valve Labeling: A schedule of valves to be provided with stainless steel tags, indicating in each case the valve location and the proposed wording for the tag.

C. Technical Manual: The Technical Manual shall contain the required information for each valve.

D. Spare Parts List: A Spare Parts List shall contain the required information for each valve assembly, where indicated.

E. Factory Test Data: Where indicated, signed, dated, and certified factory test data for each valve requiring certification shall be submitted before shipment of the valve. The data shall also include certification of quality and test results for factory-applied coatings.

PART 2 PRODUCTS

2.01 GENERAL
A. Valves and gates shall be new and of current manufacture. Shut-off valves 6- inches and larger shall have actuators with position indicators. Buried valves shall be provided with valve boxes and covers containing position indicators and valve extensions. Manual shut-off valves mounted higher than 7-feet above working level shall be provided with chain actuators.

B. Valve Actuators: Unless otherwise indicated, actuators shall be in accordance with Section 15201 (Not Included in Contract).

C. Protective Coating: The exterior surfaces of valves and the wet interior surfaces of ferrous valves of sizes 4-inches and larger shall be coated.The valve manufacturer shall certify in writing that the required coating has been applied and tested in the manufacturing plant prior to shipment, in accordance with these specifications. Flange faces of valves shall not be epoxy coated.

D. Valve Labeling: Except when such requirement is waived by the Engineer in writing, a label shall be provided on shut-off valves and control valves except for hose bibbs. The label shall be of 1/16-inch plastic or stainless steel, minimum 2- inches by 4-inches in size, and shall be permanently attached to the valve or on the wall adjacent to the valve as directed by the Engineer.

15.b
Packet Pg. 787 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO VALVES, GENERAL
CHLORINE CONVERSION PROJECT 15200- 3
E. Valve Testing: As a minimum, unless otherwise indicated or recommended by the reference standards, valves 3-inches in diameter and smaller shall be tested in accordance with manufacturer's standard and 4-inches in diameter and larger shall be factory tested as follows:

1. Hydrostatic Testing: Valve bodies shall be subjected to internal hydrostatic pressure equivalent to twice the water rated pressure of the valve. Metallic valve rating pressures shall be at 100 degrees F and plastic valves shall be 73 degrees, or at higher temperature according to type of material. During the hydrostatic test, there shall be no leakage through the valve body, end joints, or shaft seals, nor shall any part of the valve be permanently deformed. The duration shall be sufficient time to allow visual examination for leakage. Test duration shall be at least 10 minutes.

2. Seat Testing: Valves shall be tested for leaks in the closed position with the pressure differential across the seat equal to the water rated pressure of the valve. The duration of test shall be sufficient time to allow visual examination for leakage. Test duration shall be at least 10 minutes.

Leakage past the closed valve shall not exceed 1 fluid ounce per hour per inch diameter for metal seated valves. Resilient-seated valves shall be drop-tight.

3. Performance Testing: Valves shall be shop-operated from fully closed to fully open position and reverse under no-flow conditions in order to demonstrate the valve assembly operates properly.

F. Valve Marking: Valve bodies shall be permanently marked in accordance with MSS SP25 - Standard Marking Systems for Valves, Fittings, Flanges, and Unions.

2.02 MATERIALS
A. General: Materials shall be suitable for the intended application. Materials in contact with potable water shall be listed as compliant with NSF Standard 61.

Materials not indicated shall be high-grade standard commercial quality, free from defects and imperfections that might affect the serviceability of the product for the purpose for which it is intended. Unless otherwise indicated, valve and actuator bodies shall conform to the following requirements:

1. Cast Iron: Close-grained gray cast iron, conforming to ASTM A 48 - Gray Iron Castings, Class 30, or to ASTM A 126 - Gray Iron Castings for Valves, Flanges, and Pipe Fittings.

2. Ductile Iron: ASTM A 536 - Ductile Iron Castings, or to ASTM A 395 - Ferritic Ductile Iron Pressure-Retaining Castings for Use at Elevated Temperatures.

3. Steel: ASTM A 216 - Steel Castings, Carbon Suitable for Fusion Welding for High-Temperature Service, or to ASTM A 515 - Pressure Vessel Plates, Carbon Steel, for Intermediate- and Higher-Temperature Service.

15.b
Packet Pg. 788 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO VALVES, GENERAL
CHLORINE CONVERSION PROJECT 15200- 4

4. Bronze: ASTM B 62 - Composition Bronze or Ounce Metal Castings, and valve stems not subject to dezincification shall conform to ASTM B 584 - Copper Alloy Sand Castings for General Applications.

5. Stainless Steel: Stainless steel valve and operator bodies and trim shall conform to ASTM A 351 - Steel Castings, Austenitic, for HighTemperature Service, Grade CF8M, or shall be Type 316 stainless steel.

6. PVC: Poly vinyl chloride materials for valve body, flanges, and cover shall conform to Cell Classification 12454.

7. CPVC: Chlorinated poly vinyl chloride materials for valve body, flanges, and cover shall conform to Cell Classification 23447.

8. NSF Standard 61: Materials shall be listed for use in contact with potable water.

2.03 VALVE CONSTRUCTION
A. Bodies: Valve bodies shall be cast, molded (in the case of plastic valves), forged, or welded of the materials indicated, with smooth interior passages. Wall thicknesses shall be uniform in agreement with the applicable standards for each type of valve, without casting defects, pinholes, or other defects that could weaken the body. Welds on welded bodies shall be done by certified welders and shall be ground smooth. Valve ends shall be as indicated, and be rated for the maximum temperature and pressure to which the valve will be subjected.

B. Valve End Connections: Unless otherwise indicated, valves 2-1/2 inches diameter and smaller may be provided with threaded end connections. Valves 3- inches and larger shall have flanged end connections.

C. Bonnets: Valve bonnets shall be clamped, screwed, or flanged to the body and shall be of the same material, temperature, and pressure rating as the body. The bonnets shall have provision for the stem seal with the necessary glands, packing nuts, or yokes.

D. Stems: Valve stems shall be of the materials indicated, or, if not indicated, of the best commercial material for the specific service, with adjustable stem packing, O-rings, Chevron V-type packing, or other suitable seal. Bronze conforming to ASTM B 584 may be used, except that zinc content shall not exceed 16 percent.

E. Stem Guides: Stem guides shall be provided, spaced 10-feet on centers unless the manufacturer can demonstrate by calculation that a different spacing is acceptable. Submerged stem guides shall be 316 stainless steel.

F. Internal Parts: Internal parts and valve trim shall be as indicated for each individual valve. Where not indicated, valve trim shall be of Type 316 stainless steel or other best suited material.

G. Nuts and Bolts: Nuts and bolts on valve flanges and supports shall be in accordance with Section 05500.

15.b
Packet Pg. 789 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO VALVES, GENERAL
CHLORINE CONVERSION PROJECT 15200- 5

2.04 VALVE ACCESSORIES
A. Valves shall be furnished complete with the accessories required to provide a functional system.

2.05 SPARE PARTS
A. The Contractor shall furnish the required spare parts suitably packaged and labeled with the valve name, location, and identification number. The Contractor shall also furnish the name, address, and telephone number of the nearest distributor for the spare parts of each valve. Spare parts are intended for use by the City, after expiration of the correction of defects period.

2.06 MANUFACTURERS
A. Manufacturer's Qualifications: Valve manufacturers shall have a successful record of not less than 5 years in the manufacture of the valves indicated.

PART 3 EXECUTION

3.01 VALVE INSTALLATION
A. General: Valves, actuating units, stem extensions, valve boxes, and accessories shall be installed in accordance with the manufacturer's written instructions and as indicated. Gates shall be adequately braced to prevent warpage and bending under the intended use. Valves shall be firmly supported to avoid undue stresses on the pipe.

B. Access: Valves shall be installed with easy access for actuation, removal, and maintenance and to avoid interference between valve actuators and structural members, handrails, or other equipment.

C. Valve Accessories: Where combinations of valves, sensors, switches, and controls are indicated, the Contractor shall properly assemble and install such items so that systems are compatible and operating properly. The relationship between interrelated items shall be clearly noted on shop drawing submittals.

END OF SECTION

15.b
Packet Pg. 790 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO VALVES, GENERAL
CHLORINE CONVERSION PROJECT 15200- 6
This Page Intentionally Left Blank

15.b
Packet Pg. 791 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MANUAL VALVES
CHLORINE CONVERSION PROJECT 15202- 1
SECTION 15202

MANUAL VALVES
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Bronze Ball Valves
B. Metal Seated Gate Valves
C. Resilient-Seated Gate Valves
D. Backflow Preventer Valves
E. Pressure Reducing Valves
F. Valve Operators and Appurtenances

1.02 RELATED REQUIREMENTS
A. Trenching, Backfilling, and Compacting: 02223

1.03 REFERENCED STANDARDS
A. American Water Works Association

1. AWWA C105: Polyethylene Encasement for Ductile-Iron Pipe Systems

2. AWWA C210: Liquid-Epoxy Coating Systems for the Interior and Exterior of Steel Water Pipelines

3. AWWA C213: Fusion-Bonded Epoxy Coating for the Interior and Exterior of Steel Water Pipelines

4. AWWA C500: Metal-Seated Gate Valves for Water Supply Service

5. AWWA C504: Rubber-Seated Butterfly Valves

6. AWWA C509: Resilient Seated Gate Valves

7. AWWA C510: Resilient-Seated Gate Valves for Water Supply Service

8. AWWA C515: Reduced-Wall, Resilient-Seated Gate Valves for Water Supply Service
B. ASTM International

1. ASTM A126: Standard Specification for Gray Iron Castings for Valves, Flanges, and Pipe Fittings

15.b
Packet Pg. 792 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MANUAL VALVES
CHLORINE CONVERSION PROJECT 15202- 2

2. ASTM A536: Standard Specification for Ductile Iron Castings

3. ASTM B62: Composition Brass or Ounce Metal Castings

1.04 SUBMITTALS
A. Product Data Sheets
B. Shop Drawings

1.05 QUALITY ASSURANCE
A. Contractor shall use valves from a single approved manufacturer for all valves throughout project/development.

B. All materials in contact with water shall comply with ANSI/NSF61.

PART 2 PRODUCTS

2.01 GENERAL
A. Valves shall be installed complete with operating handwheels or levers, extension stems, worm gear operators, operating nuts, and wrenches required for operation.

B. Valves shall have the name of the manufacturer and the size of the valve cast or molded onto the valve body or bonnet or shown on a permanently attached plate.

C. Valve body and trim casting shall be of domestic origin.

D. Bolts for all valves shall be 316 stainless steel with insulating disc/spacer for dissimilar metals

2.02 BRONZE BALL VALVES
A. Aboveground Ball Valves 3 Inches and Smaller

1. Aboveground threaded end ball valves, 1/4 inch through 3 inches, for water service shall be full bore port ball type having a minimum working pressure of 200 psi WOG. Valves shall have plastic coated lever operators.

2. Materials of construction shall be as described below:

Component Material Specification
Body Bronze ASTM B 62
Ball Bronze ASTM B 62
Seat, Seals PTFE

15.b
Packet Pg. 793 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MANUAL VALVES
CHLORINE CONVERSION PROJECT 15202- 3

3. Stem material shall have a minimum tensile strength of 60,000 psi and a minimum yield strength of 30,000 psi.

2.03 METAL SEATED GATE VALVES
A. Valves shall conform to AWWA C500 and the following.

B. Gate valves shall be designed for a working pressure of 150 psi or 250 psi as required.

C. Valves shall be ductile iron bodied, solid bronze internal working parts, parallel faced, bottom wedging double-discs, non-rising stem opening to the left, O-Ring seals, and a 2-inch-square operating nut.

D. Materials of construction shall be as described below:

E. Gate valve stems shall be of low zinc content (2-percent), having a minimum tensile strength of 70,000 psi, a yield strength of 40,000 psi, and 12-percent elongation in 2 inches. The stem is to be visibly marked so that it meets this requirement.

F. Gate valves shall be furnished with ends as specified on plans or by the City.

2.04 TAPPING VALVES (NOT USED)

2.05 BUTTERFLY VALVES (NOT USED)

2.06 RESILIENT-SEATED WEDGE GATE VALVES
Stem Bronze or
Copper silicon
ASTM B 62, B 99
(Alloy 651), B 584
B 371 (Alloy 694)
Component Material Specification
Body, Bonnet Cast Iron or
Ductile Iron
--
Operating Nut,
Stuffing Box
Bronze ASTM B62
Bonnet Bolts Stainless Steel Type 316
Stuffing Box Bolts
Bolts
Stainless Steel Type 316
Interior Parts,
Gate
Ductile Iron ASTM A536
O-Rings Synthetic rubber ASTM D2000

15.b
Packet Pg. 794 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MANUAL VALVES
CHLORINE CONVERSION PROJECT 15202- 4
A. Valves shall conform to AWWA C509 or AWWA C515 and the requirements listed herein.

B. All valves shall be bubble tight at 200 psi working pressure.

C. Valves shall have non-rising low zinc stems, opening by turning left and provided with 2-inch-square operating nut. Outside stem and yolk valves shall be used on backflow device shutoff valves.

D. Each valve shall have a smooth unobstructed waterway free from any sediment pockets.

E. Stuffing boxes shall by O-ring seal type with two rings located in stem.

F. Low friction torque reduction thrust bearings shall be located both above and below the stem collar.

G. Materials shall be as described below:

Component Material Specification
Body, Operating Nut
Bonnet, Seal Plate
Cast Iron or
Ductile Iron
ASTM A 126
Class B
Gate Cast Iron or
Ductile Iron
Bonnet and Seal
Bolts
Stainless Steel Type 316
O-Rings Synthetic Rubber ASTM D2000
H. All internal working parts (excluding gate) shall be all bronze containing not more than 2 percent aluminum or more than 7 percent zinc. Valve stems shall be cast or forged from bronze having a tensile strength of not less than 60,000 psi, a yield point of not less than 30,000 psi, and an elongation of not less than 10 percent in 2 inches.

I. All gates shall be rubber encapsulated.

2.07 BACKFLOW PREVENTER VALVES
A. Backflow preventers shall work reduced pressure principle type. They shall consist of 2 spring-loaded check valves, automatic differential pressure relief valve, drain valves, and shut-off valves. The body material shall be bronze or cast iron for a working pressure of not less than 150 psi, with bronze or stainless steel trim. Drain lines with air gaps shall be provided. The backflow preventer valves shall be in accordance with the latest edition of AWWA C510 or C511 standard.

15.b
Packet Pg. 795 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MANUAL VALVES
CHLORINE CONVERSION PROJECT 15202- 5
B. Backflow prevention assemblies shall be an approved device per the California State Water Resources Control Board.

C. The shut-off valves for assemblies 3-inch and larger shall be resilient seat gate valves. Ball valves shall be used on assemblies smaller than 3-inch. Shut-off valves shall have outside stems and yokes.

D. Bypass piping shall be copper or brass.

E. Manufacturers, or Equal.

1. Wilkins Regulator Division (Zurn Industries)

2. Febco (CMB Industries)

3. Watts, ACV

2.08 PRESSURE REDUCING VALVES
A. Valves 2 Inches and Larger: Pressure reducing valves for water shall be diaphragm-operated, pilot-controlled, and shall have a single seat. Valves shall maintain a constant downstream pressure regardless of upstream pressure variations. Internal metal parts shall be high-solids epoxy-coated. Valves shall be carbon steel in accordance with ASTM A216, Grade WCB or WCC, and ASTM A703; or shall be bronze in accordance with ASTM B61 or ASTM B62. Flanged end connections shall be in accordance with ASME B16.5, Class 150.

Pressure-reducing pilots shall be direct-acting, spring-loaded, and adjustable. The trim shall be Type 316 stainless steel. The outlet pressure range shall be 25 to 100 psi unless shown otherwise on the drawings. Additional springs shall be provided as required to achieve the full range of the valves. The main seats shall have a V-port section to ensure precise control at low flow rates. The diaphragms and the seat discs shall be Buna-N. Valves shall be fully serviceable in the line. The valves shall be Cla-Val Company, Model 90G-01, Watts Model 115, or approved equal.

B. Valves Less Than 2 Inches: Pressure reducing valves shall be self-operating regulating-type. Valve bodies shall be cast iron or bronze, and internal parts shall be Type 316 stainless steel. Valve plugs and seat rings shall be Type 316 stainless steel. Plug guides shall be brass. Valves shall have internal outlet-pressure registration. The maximum inlet pressure shall be 250 psi with a normal range of 50 to 125 psi. Additional springs shall be provided as required to achieve the full range of the valves. The outlet pressure range shall be 15 to 100 psi unless shown otherwise on the drawings, and the pressure shall be fully adjustable for the range of each spring by an external adjusting screw. Valves shall be full line-size as shown on the drawings. Valve shall be Fisher, Model 95H or approved equal.

2.09 BOLTS AND NUTS FOR FLANGED VALVES
A. Bolts and nuts for flanged valves shall be Type 316 stainless steel conforming to ASTM A 193, Grade B8M for bolts, and ASTM A 914, Grade 8M for nuts.

15.b
Packet Pg. 796 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MANUAL VALVES
CHLORINE CONVERSION PROJECT 15202- 6
B. Provide one (1) washer for each nut. Washer shall be of the same material as the nuts.

C. The length of each bolt or stud shall be such that between 1/4 inch and 3/8 inch will project through the nut when drawn tight.

D. Tie-bolts for restrained joints shall be Type 316 stainless steel.

2.10 GASKETS
A. Flange Gaskets: Gaskets for flanged end valve shall be 1/8-inch thick, synthetic-fiber rubber. Full face type gaskets with pre-punched holes shall be used where both flanges are flat face. Ring gaskets extending to the inner edge of the bolts may be used where a raised face flange is present.

B. Push on or mechanical joint gaskets: Rubber gaskets for push on joints shall be synthetic or natural rubber manufactured in accordance with AWWA C111

2.11 VALVE OPERATORS
A. Provide lever or wrench operators having adjustable, "position indicator" for exposed valves smaller than 6 inches.

B. Provide 2-inch AWWA operating nuts for buried and submerged valves.

C. For buried or submerged service, provide watertight shaft seals and watertight valve and actuator cover gaskets.

D. Provide totally enclosed operators designed for buried or submerged service.

E. Traveling nut and worm and gear operators shall be of the totally enclosed design so proportioned as to permit operation of the valve under full operating head with a maximum pull of 80 pounds on the handwheel or crank. Provide stop limiting devices in the operators in the open and closed positions. Operators shall be of the self-locking type to prevent the disc or plug from creeping. Design operator components between the input and the stop-limiting devices to withstand without damage a pull of 200 pounds for handwheel or chainwheel operators and an input torque of 300 foot-pounds for operating nuts when operating against the stops.

F. Operators on buried valves shall produce the required torque on the operating nut with a maximum input of 150 foot-pounds.

G. Valve operators, handwheels, or levers shall open by turning counterclockwise.

2.12 VALVE BOXES FOR BURIED VALVES
A. Valve extension pipe material shall be 8-inch PVC SDR 35 pipe.

B. Design cast iron valve box cover to rest within a frame on a cast-in-place concrete ring surrounding the valve extension pipe; size the tapered skirt of the cover for a close fit inside the upper sleeve portion of the valve box. Valve box covers for the potable water system shall be circular with the word "WATER" cast on the cover.

15.b
Packet Pg. 797 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MANUAL VALVES
CHLORINE CONVERSION PROJECT 15202- 7

2.13 EXTENSION STEMS FOR BURIED VALVE OPERATORS
A. Where the depth of the valve nut exceeds 96-inches, provide operating extension stems to bring the operating nut to a point 24-inches to 30-inches below the surface of the ground and/or box cover.

B. Extension stems shall be steel and shall be complete with 2-inch-square operating nut.

C. Valve stem extensions shall be of a solid design (no pinned couplings permitted) with guides.

2.14 FACTORY FINISHES
A. Valve interior and exterior surfaces:

1. Fusion bonded epoxy per AWWA C213

2. Liquid-epoxy per AWWA C210 allowed for touch up and when valve design uses bonded rubber seats

3. Conform to requirements of NSF 61 for interior coatings.

PART 3 EXECUTION

3.01 JOINTS
A. Bolt holes of flanged valves shall straddle the horizontal and vertical centerlines of the pipe run to which the valves are attached. Clean flanges by wire brushing before installing flanged valves. Clean flange bolts and nuts by wire brushing, lubricate threads with oil and graphite, and tighten nuts uniformly and progressively. If flanges leak under pressure testing, loosen or remove the nuts and bolts, reseat or replace the gasket, reinstall or retighten the bolts and nuts, and retest the joints. Joints shall be watertight.

B. Clean threaded joints by wire brushing or swabbing. Apply Teflon joint compound to Teflon tape to pipe threads before installing threaded valves. Joints shall be watertight.

C. Rubber ring grooves of valves shall be inspected before installation by the Contractor for ridges or holes that would interfere with the rubber ring.

Interferences with the rubber ring shall be corrected to a satisfactory connection or the valves replaced, as required by the City. (All valves shall have the same rubber-ring groove profile as the groove of the pipe couplings furnished with the pipe.)

3.02 BUTTERFLY VALVE OPERATORS (NOT USED)

3.03 EXTERIOR PROTECTION
A. Coat all valve metal surface, except seating areas and bronze and stainless-steel surfaces

15.b
Packet Pg. 798 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MANUAL VALVES
CHLORINE CONVERSION PROJECT 15202- 8
B. Valve exterior surface buried service: provide all of the following

1. Apply bituminous tar mastic for all exterior metal and primed surfaces including valve bodies, flanges, mechanical joints, and hardware.

2. Wrap buried valves with 8-mil polyethylene wrap per AWWA C105. Wrap beyond valve by 12 inches on both sides.

3. Valve exterior surface, above grade or in vault: apply coatings per Engineer’s direction

4. Bolts and nuts shall be coated with corrosion guard. Christy’s CG-15, or approved equal.

3.04 CONCRETE SUPPORTS
A. Inline valves shall be anchored in concrete as shown in City standard drawing.

B. Concrete supports will not be required under valves bolted to flanged fittings.

C. Until supports are poured, valves shall be temporarily supported by placing wooden skids underneath the valve so that the pipe is not subjected to the weight of the valve.

D. All concrete anchors and thrust blocks specified or required by the City are considered as part of the pipeline installation.

3.05 VALVE BOXES
A. Valve boxes shall be firmly supported and shall be kept centered and plumb over the operating nut of the valve.

B. Beveled sections of pipe will not be allowed at the top of the valve extension pipe.

The top cut shall be square and machine made.

C. During the construction of new tracts, the valve extension pipes for "key valves" shall extend well above the ground level to permit ease of location in case of emergency shutoffs.

D. The box cover shall be flush with the surface of the finished pavement or at any other level designated by the City.

3.06 BACKFILL
A. All backfill within 24 inches of a valve shall be clean, washed sand.

B. Backfill is to be placed and compacted in accordance with Section 02223.

3.07 VALVE LEAKAGE TESTING
A. Test valves for leakage at the same time that the connecting pipelines are tested.

See Section 15050 for pressure testing requirements.

15.b
Packet Pg. 799 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MANUAL VALVES
CHLORINE CONVERSION PROJECT 15202- 9
B. Valves shall have a pressure rating higher than or equal to the test pressure.

3.08 VALVE LOCATION
A. The location of all valves shall be marked with a 2-inch “V” chiseled in the curb face perpendicular to the valve. The offset distance, in feet, from the curb face to the valve shall be chiseled next to the “V”. Where a perpendicular offset is not possible, multiple tangential offsets will be required to allow triangulation of the valve location.

END OF SECTION

15.b
Packet Pg. 800 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO MANUAL VALVES
CHLORINE CONVERSION PROJECT 15202- 10
This Page Intentionally Left Blank

15.b
Packet Pg. 801 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PLASTIC VALVES
CHLORINE CONVERSION PROJECT 15204- 1
SECTION 15204

PLASTIC VALVES
PART 1 GENERAL

1.01 Description
A The Contractor shall furnish and install all valves, actuators, and appurtenances, complete and operable, in accordance with the Contract Documents.

B. The provisions of this Section shall apply to valves and valve actuators except where otherwise indicated. Valves and actuators in particular locations may require a combination of units, sensors, limit switches, and controls indicated in other sections of the specifications.

C. Where a valve is to be supported by means other than the piping to which it is attached, the Contractor shall obtain from the valve manufacturer a design for support and foundation that satisfies the design criteria. The design, including drawings and calculations sealed by an engineer, shall be submitted with the shop drawings. When the design is approved, the support shall be provided.

D. Unit Responsibility: A single manufacturer shall be made responsible for coordination of design, assembly, testing, and furnishing each valve; however, the Contractor shall be responsible to the City for compliance with the requirements of each valve section. Unless indicated otherwise, the responsible manufacturer shall be the manufacturer of the valve.

E. Single Manufacturer: Where 2 or more valves of the same type and size are required, the valves shall be furnished by the same manufacturer.

F. Requirement: All materials in contact with water shall comply with ANSI/NSF61.

1.02 Contractor Submittals
A. Submittals shall be in accordance with the requirements of General Conditions, Article 9 and Special Conditions, Article 9.

B. Shop Drawings: Shop drawings shall contain the following information:

1. Valve name, size, Cv factor, pressure rating, identification number (if any), and specification section number.

2. Complete information on valve actuator, including size, manufacturer, model number, limit switches, and mounting.

3. Cavitation limits for control valves.

15.b
Packet Pg. 802 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PLASTIC VALVES
CHLORINE CONVERSION PROJECT 15204- 2

4. Assembly drawings showing part nomenclature, materials, dimensions, weights, and relationships of valve handles, handwheels, position indicators, limit switches, integral control systems, needle valves, and control systems.

5. Complete wiring diagrams and control system schematics.

6. Valve Labeling: A schedule of valves to be provided with stainless steel tags, indicating in each case the valve location and the proposed wording for the tag.

C. Technical Manual: The Technical Manual shall contain the required information for each valve.

D. Spare Parts List: A Spare Parts List shall contain the required information for each valve assembly, where indicated.

E. Factory Test Data: Where indicated, signed, dated, and certified factory test data for each valve requiring certification shall be submitted before shipment of the valve. The data shall also include certification of quality and test results for factory-applied coatings.

PART 2 PRODUCTS

2.01 Plastic Ball Check Valves
A. General: Plastic ball check valves for corrosive fluids, in sizes up to 4-inches, shall be used for vertical up-flow conditions only, unless the valves are provided with spring actions.

B. Construction: The valve bodies and balls shall be of polyvinyl chloride (PVC), chlorinated polyvinyl chloride (CPVC), polyvinylidene fluoride (PVDF), or polypropylene (PP) construction, as best suited for each individual service condition. They shall have unions with socket connections or flanged ends conforming to ASME B16.5 - Pipe Flanges and Flanged Fittings, class 150. The valve shall be EPDM Seals with stainless steel spring with flow direction indicator. The valves shall be suitable for a maximum working non-shock pressure of 150 psi at 73 degrees F.

C. Manufacturers, or Equal

1. Hayward

2. NIBCO Inc. (Chemtrol Division)

3. Spears Mfg. Co. (PVC, CPVC, and PP only)

2.02 Plastic Swing or Wye-Check Valves (Chemical Service) A. General: Plastic swing or wye-check valves for corrosive fluids, in sizes up to 8- inches or as available, may be used for horizontal or vertical up-flow conditions.

15.b
Packet Pg. 803 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PLASTIC VALVES
CHLORINE CONVERSION PROJECT 15204- 3
B. Construction: The valve bodies and discs or piston shall be of PVC, CPVC, PP, or PVDF construction as best suited for each individual service condition. They shall have flanged ends conforming to ASME B16.5 Class 150, and flanged top access covers and shall shut positively at no-flow conditions. The seats and seals shall be of EPDM. The PVC valves shall be rated for a maximum nonshock working pressure of 150 psi at 73 degrees F for sizes 3-inches and smaller. For larger sizes and other materials and temperatures the pressure rating may be lower.

C. Manufacturers shall be Hayward, Spears Mfg. Co. (Plastic Swing Check only) or equal.

2.03 Plastic Ball Valves
A. General: Plastic ball valves for corrosive fluids shall be made of polyvinyl chloride (PVC), chlorinated polyvinyl chloride (CPVC), polypropylene (PP), or polyvinylidene fluoride (PVDF), as recommended by the manufacturer for the specific application.

B. Construction: Plastic ball valves shall have union ends or flanged ends to mate with ANSI B 16.5, class 150 flanges for easy removal. The balls shall have full size ports and Teflon seats. Body seals, union O-ring seals, and stem seals shall be corrosion resistant. External (without entering into the wetted area) seat packing adjustment is preferred. Metal reinforced stems to prevent accidental breakage are preferred. Ball valves for sodium hypochlorite solution service shall be drilled through the ball or body per valve manufacturer recommendation to relieve off gas and equalize pressure across the valve. The valves shall be suitable for a maximum working non-shock pressure of 150 psi at 73 degrees F for PVC and CPVC, with decreasing ratings for higher temperatures and other plastics.

C. Manufacturers shall be Hayward, Spears Mfg. Co., or equal.

PART 3 EXECUTION

3.01 Valve Installation
A. General: Valves, actuating units, stem extensions, valve boxes, and accessories shall be installed in accordance with the manufacturer's written instructions and as indicated. Gates shall be adequately braced to prevent warpage and bending under the intended use. Valves shall be firmly supported to avoid undue stresses on the pipe.

B. Access: Valves shall be installed with easy access for actuation, removal, and maintenance and to avoid interference between valve actuators and structural members, handrails, or other equipment.

C. Valve Accessories: Where combinations of valves, sensors, switches, and controls are indicated, the Contractor shall properly assemble and install such items so that systems are compatible and operating properly. The relationship between interrelated items shall be clearly noted on shop drawing submittals.

15.b
Packet Pg. 804 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO PLASTIC VALVES
CHLORINE CONVERSION PROJECT 15204- 4
D. Care shall be taken that valves in plastic lines are well supported at each end of the valve.

END OF SECTION

15.b
Packet Pg. 805 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO SAFETY SHOWER AND EYEWASH
CHLORINE CONVERSION PROJECT 15480- 1
SECTION 15480

SAFETY SHOWER AND EYEWASH
PART 1 GENERAL

1.01 Description
A. This Section specifies emergency safety shower and eyewash and water tempering system.

B. American National Standard Institute (ANSI): ANSI Z358.1, Emergency Eyewash and Shower Equipment.

C. Requirement: All materials in contact with water shall comply with ANSI/NSF61.

1.02. Contractor Submittals
A. Submittals shall be made in accordance with the requirements of Section 01300.

B. The Contractor shall submit the following information: Detailed arrangement and outline drawings, including plan and elevation views, showing all equipment being furnished with dimensions, required clearances and piping connections and sizes.

C. Spare Parts List: A Spare Parts List shall contain the required information for each safety shower and eyewash, and water tempering system assembly, where indicated.

PART 2 PRODUCTS

2.01 Combination Emergency Shower and Eyewash Station
A. The emergency shower and eyewash stations shall be free standing combination units in accordance with ANSI Z358.1, and shall meet federal, state and local regulatory requirements including, but not limited to, Cal/OSHA rules and regulations.

B. The unit frame and support shall consist of a 1-1/4-inch galvanized steel pipe with a 9 inch diameter floor flange.

C. The shower head shall be stainless steel and shall be easily activated by an instant action, stay open, chrome plated brass ball valve with highly visible stainless-steel pull rod.

D. The eyewash shall have a stainless-steel receptor or bowl with soft PVC covered twin heads with automatically release dust covers.

E. The eyewash shall be activated an instant action, stay open, chrome plated brass valve with highly visible stainless-steel push flag and/or foot treadle.

15.b
Packet Pg. 806 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO SAFETY SHOWER AND EYEWASH
CHLORINE CONVERSION PROJECT 15480- 2
F. The unit shall have a 1-1/4-inches supply and a 1-1/4-inches drain.

G. Each unit shall be equipped with a flow switch, which shall be externally wired to generate a remote alarm.

H. The emergency shower and eyewash units shall be as manufactured by HAWS Model 8300 or approved equal.

PART 3 EXECUTION

3.01 Equipment Installation
A. Equipment shall be located and installed as shown on the drawings and in accordance with manufacturer's printed recommendations.

3.02 Field Acceptance Testing
A. After installation, equipment shall be flushed and tested to ensure proper troublefree operation.

END OF SECTION

15.b
Packet Pg. 807 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 1
SECTION 16010

ELECTRICAL GENERAL PROVISIONS
PART 1 GENERAL

1.01 THE REQUIREMENT
A. General

1. The Contractor shall provide all tools, materials, equipment, and labor necessary for the furnishing, construction, installation, testing, and operation of all electrical Work necessary to provide a complete and operable system, all in accordance with the requirements of the Contract Documents.

2. The provisions of this Section shall apply to all electrical items specified in the various sections of Division 16 and all other Specification divisions specifying electrical items, except where otherwise indicated in the Contract Documents.

B. The Contractor shall be responsible for:

1. Complete systems in accordance with the intent of these Contract Documents.

2. The Contractor shall coordinate the incoming electrical service with the electric utility company providing service.

3. The Contractor shall coordinate the details of facility equipment and construction for all Specification divisions which affect the Work covered under Division 16, Electrical.

4. The Contractor shall furnish and install all incidental items not actually shown or specified, but which are required to provide complete functional systems.

5. The Contractor shall lay out electrical Work prior to placing floors and walls to properly locate all penetrations and shall furnish and install all sleeves and openings required for passage of all raceways.

6. The Contractor shall furnish and install all inserts and hangers required to support raceways and other electrical equipment and materials.

7. The Contractor shall notify Engineer in writing 48 hours in advance of energizing any new electrical equipment or de-energizing of any existing equipment. If the energization or de-energization is rescheduled, a new notification shall be made. The Contractor shall not proceed with energization or de-energization without approval by Engineer.

15.b
Packet Pg. 808 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 2

8. Temporary Power: The Contractor shall furnish, install, and maintain all temporary power and lighting systems needed for construction. This temporary system shall include weatherproof panel(s) for the Contractor's main circuit breakers, power distribution system, and ground fault interrupting equipment. All connections shall be watertight with wiring done with Type SO portable cable as a minimum. The Contractor shall remove all temporary power, equipment and devices after construction is completed. Temporary power shall be sourced from existing plant service at convenient locations. Coordinate with the Engineer for source location and requirements of temporary power.

C. Existing Conditions

1. Contractor shall field verify the existing conditions.

2. Carry out any Work involving the shutdown of existing services to any piece of equipment now functioning and the tie-in of equipment to the existing system at such time as to provide the least amount of inconvenience to Owner. Do such Work when directed by the Engineer.

3. Construction Coordination and Electrical Downtime: See the General Requirements of these Specifications regarding scheduling of electric power interruptions.

4. Before any Work is performed in manholes containing medium-voltage circuits, these circuits shall be de-energized. All such efforts shall be coordinated with the Engineer.

5. After award of Contract, confer with the Engineer to verify each area of construction activity and location of existing underground utilities. Protect all existing underground utilities during construction.

6. Prior to starting any underground Work, the Contractor shall obtain all the information of the underground utilities and obstructions from the Engineer and take proper precautions to locate the utilities by potholing or other means acceptable to the Engineer.

D. Intent of Drawings: The Drawings show only general locations of equipment, devices, and raceway, unless specifically dimensioned. The Contractor shall be responsible for the proper routing of raceway, subject to acceptance by the Engineer.

1.02 RELATED WORK SPECIFIED ELSEWHERE
A. The requirements of the following sections and divisions apply to the Work of this Section. Other sections and divisions of these Specifications, not referenced below, shall also apply to the extent required for proper performance of this Work.

1. Section 01660 Installation, Testing, Commissioning, Training, and Project Closeout

15.b
Packet Pg. 809 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 3

2. Division 16, Electrical, other applicable sections

3. Division 17, Instrumentation and Control, applicable sections B. All concrete Work required for encasement, installation, and construction of the Work specified in the various sections of Division 16 shall be included as a part of the Work hereunder, provided that the following exceptions and supplementary requirements shall apply:

1. Consolidation of encasement concrete around duct banks shall be by mechanical vibration.

2. A workability admixture shall be used in encasement concrete, which shall be a hydroxylated carboxylic acid type in liquid form. Admixtures containing calcium chloride shall not be used.

3. Concrete for encasement of conduit and duct banks shall contain an integral red-oxide coloring pigment in the proportion of 8 pounds per cubic yard of concrete.

C. Components for heating, ventilating, air-conditioning systems, including conductors for control wiring, unless specifically shown on the Drawings D. Materials and equipment furnished and installed under other divisions with raceway and electrical conductors furnished, installed, and connected under Division 16, Electrical.

1.03 REFERENCE SPECIFICATIONS, CODES, AND STANDARDS
A. All Work specified herein shall conform to or exceed the applicable requirements of the referenced portions of the following publications to the extent that the provisions thereof are not in conflict with other provisions of these Specifications.

B. Comply with the applicable editions of the following codes, regulations, and standards.

1. Codes and Regulations
29 CFR 1910 Code of Federal Regulations, Title 29, Part 1910, U.S.

Occupational Safety and Health Standards (OSHA)
CCR California Code of Regulations, Title 8, Div. 1, Chap. 4, Subchapter 5, Electrical Safety Orders
CCR California Code of Regulations, Title 8, Industrial Relations (Cal/OSHA), other applicable provisions
CCR California Code of Regulations, Title 24, Building Standards Code
NFPA 70 National Electrical Code (NEC)

1. Industry Standards

15.b
Packet Pg. 810 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 4
NECA National Electrical Installation Standards (NEIS)

2. Other Standards: All electrical equipment and materials shall be designed, manufactured, and installed in accordance with the latest published edition of the applicable standards of the following standard-making organizations.

Specific standards are identified in the various sections for specific types of equipment and materials
AEIC Association of Edison Illuminating Companies
ANSI American National Standards Institute
ASTM ASTM International (formerly, American Society for Testing and Materials)
CSA Canadian Standards Association
FM FM Approvals (formerly, Factory Mutual Research
Corporation)
ICEA Insulated Cable Engineers Association
IEEE Institute of Electrical and Electronics Engineers
NECA National Electrical Contractors Association
NEMA National Electrical Manufacturers Association
NETA InterNational Electrical Testing Association
UL Underwriters Laboratories
C. The construction and installation of all electrical equipment and materials shall comply with all provisions of the codes, regulations and standards specified above, as applicable, and other applicable federal, state and local codes, laws and regulations.

1. Local Authorities
a. Imperial County, CA, Building Department
b. Imperial Irrigation City, Indio, CA
c. Imperial County, CA, Fire Department
D. All Work specified herein shall conform to or exceed the applicable requirements of the NFPA 70 - National Electric Code (NEC) and California Electrical Code.

Where provisions of the NFPA 70 and the California Electrical Code are in conflict, the more stringent provisions, as interpreted by the applicable authority having jurisdiction, shall govern. Where a local code or ordinance is in conflict with the NFPA 70 and California Electrical Code, the provisions of said local code ordinance shall take precedence.

E. Comply with the applicable reference Specifications as directed in the General Requirements and the Additional General Requirements.

1.04 CONTRACTOR SUBMITTALS

15.b
Packet Pg. 811 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 5
F. Submittals shall be in accordance with the General Requirements, the Additional General Requirements, and as specified herein. Submittals shall include the following:

1. Shop drawings: Shop drawings shall provide sufficient information to evaluate the suitability of the proposed material and equipment for the intended use and for compliance with the Contract Documents. The Contractor shall also clearly state deviations from the Contract Documents on the first page of the submittal. The Contractor shall review the shop drawings for compliance with the Contract Documents before submitting them to the Engineer for review. Shop drawings shall include the following:
a. Equipment front, side, and rear elevations, footprints, top views, and internal component layout with dimensions.
b. Location and size of conduit entrances and access plates. c. Component data.
d. Material lists show manufacturer and brand name of each item or class of material.
e. Elementary diagrams, block diagram, connection and
interconnection diagrams.
f. Elementary diagrams shall include individual elementary (schematic) diagram (drawing) for all equipment. Adapter tables shall not be used except as accepted by the Engineer. Elementary diagrams shall show tag numbers, fuse sizes, control power transformer voltage and VA ratings, wire numbers, terminal block numbers, terminal numbers, PLC input/outputs with tag numbers and descriptions, and all related internal and external control devices. The wire number shall be the rung number next to the wire.

Use suffixes, as needed, for rung with more than one wire. g. Wiring (connection and interconnection) diagrams shall show all connections, devices, terminal numbers, cable numbers, and item designations. These diagrams should show the various
components in their relative physical location. Diagrams shall be prepared in AutoCAD format. All the text information on the diagrams shall be added as AutoCAD attributes to facilitate export of the information to Microsoft Excel format files.
h. One-line diagrams and three-line diagrams, as applicable. i. Method of anchoring and weight.
j. Finish color and painting method.
k. Nameplate locations, color, legend, size, and mounting methods. l. Temperature limitations and special cooling requirements, as applicable.
m. Rating of equipment per Contract Documents.
n. NEMA rating and material of enclosures.

15.b
Packet Pg. 812 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 6
o. UL, FM, or agency listings acceptable to the Engineer.

2. Contractor-prepared Drawings: Drawings prepared by the Contractor for construction shall include the following:
a. All concealed below-grade and in concrete slab electrical installations showing depths and routing shall be submitted a minimum of four (4) weeks before concrete is poured.
b. Drawings showing dimensioned conduit stub-ups from below-grade and/or concrete slab shall be submitted a minimum of four (4) weeks before concrete is poured. These drawings shall coordinate with the dimensions, arrangement, and conduit/cable entrances of the accepted equipment shop drawings.

3. Drawing sheet sizes shall be 11 inches by 17 inches, 17 inches by 22 inches, or 22 inches by 34 inches. Maximum drawing sheet size shall be 22 inches by 34 inches. All drawings shall be legible when printed as halfsize drawings. Drawings shall be prepared using AutoCAD software.

Software version shall be the latest or as accepted by the Engineer.

4. Catalog Data: Catalog cuts, bulletins, and brochures shall be submitted for mass-produced, non-custom manufactured material. These documents shall show Project name, Project number, applicable Specification section and paragraph. Applicable model number and options shall be annotated.

5. Installation, Operation, and Maintenance Manuals: The Contractor shall furnish these manuals as specified under Operation and Maintenance Manuals of the General Requirements, Additional General Requirements and as specified herein.

6. Recommended Spare Parts List: A recommended spare parts list shall be submitted for each piece of equipment. Owner will order the appropriate spare parts for use. The Contractor shall also furnish the name, address, and telephone number of the nearest distributor for each piece of equipment.

7. Equipment seismic restraint design and calculations: The design and calculations shall be signed by a Professional Structural Engineer registered in the State of California.

8. A Material Safety Data Sheet (MSDS) shall be provided for each type of paint solvent, cleaner, oil, etc. supplied.

9. Standard test reports for mass-produced equipment shall be submitted along with the shop drawing for such equipment. Factory and field test reports on testing specifically required for individual pieces of equipment shall be submitted to the Engineer for review prior to Final Acceptance of the Project.

10. Protective Device Coordination Information: During the Contract period, the Contractor shall perform and submit a protective device coordination

15.b
Packet Pg. 813 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 7
study to determine the proper settings for all protective relays, circuit breakers, and selection of fuses of this Project.

11. Contractor’s methods for temporary storage and protection of electrical equipment and material.

1.05 QUALITY ASSURANCE
A. General

1. Comply with the requirements specified herein and the applicable reference Specifications of the General Requirements and the Additional General Requirements.

2. Tests: The Contractor shall make all tests as specified in Section 01660, and Section 16080. All such tests shall be performed in the presence of the Engineer. The Contractor shall furnish all necessary testing equipment and pay all costs of tests, including rework and retest resulting from faulty installations and/or noncompliance with Specifications. Operational testing shall be performed on all equipment furnished to confirm they function as intended.

3. Any material and equipment that fails the field tests shall be replaced, repaired, and retested until the specified requirements are met.

4. Shop inspection and witnessed Factory Demonstration Tests (FDTs) of electrical equipment by the Engineer shall be as described below. The Contractor shall coordinate these tests as specified under “Material Samples and Tests” of the General Requirements.

B. Contractor Qualifications

1. Comply with the requirements for the certifications, licenses, training, skills, experience, and other qualifications specified in Part 3, Article entitled “General” of this Specification.

2. Comply with the requirements for the certifications, licenses, training, skills, experience, and other qualifications specified in Part 3, Article entitled “Checkout and Startup” of this Specification.

1.06 SITE CONDITIONS
A. General: Daytime temperature maximum is 125°F; lowest recorded temperature is 18F. Equipment and devices shall operate properly from 100°F thru 130°F. The interior of electrical enclosures shall not exceed 140°F; provide supplemental ventilation, cooling or air conditioning to meet this requirement. Enclosures shall be equipped with thermostatically-controlled heaters. Motors shall be equipped with winding or space heaters.

B. Relative humidity 10-95%.

15.b
Packet Pg. 814 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 8
C. This is a rural area with significant farming activity. All enclosures (including indoor) shall be dust-tight gasketed. All forced air vents shall be equipped with washable filters.

D. Seismic Requirements

1. The installation of the equipment and appurtenances furnished under this Contract shall comply with the latest seismic codes.

1.07 WARRANTY
A. Provide as a minimum the manufacturer’s standard warranty on all equipment.

Provide a CONTRACTOR’s warranty for labor of minimum 1 year starting from the date of occupancy.

1.08 COMMISSIONING
A. Comply with this Specification and Section 01660 of these Specifications.

PART 2 PRODUCTS

2.01 GENERAL
A. All equipment furnished by the Contractor shall be listed by and bear the label of UL, FM, or an OSHA-recognized testing laboratory.

B. All electrical equipment and materials shall be capable of operating successfully at full-rated load, without failure, at an ambient temperature of 40 degrees C (104 degrees F).

C. The equipment shall meet the seismic requirements per latest seismic code.

2.02 AREA DESIGNATIONS:

A. General: Areas are classified as General Purpose Dry, Wet and Corrosive, and Wet, Corrosive, and Hazardous. Install electrical enclosures and conduit systems accordingly.

Area Area Designation
MCC room General purpose dry
Indoor air-conditioned rooms or
buildings
General purpose dry
Chemical storage area Wet, corrosive, and hazardous
Electrical vaults, manholes, or
handholes
Wet, corrosive, and hazardous
Pump room Wet, corrosive, and hazardous

15.b
Packet Pg. 815 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 9
Area Area Designation
Outdoor locations Wet and corrosive
All other locations Wet and corrosive
Hazardous areas Wet, Corrosive, and Hazardous

1. General Purpose Dry Locations: The enclosures shall be NEMA 1 gasketed in electrical rooms, distribution centers, power buildings and airconditioned rooms. NEMA 12 for all other general purpose dry locations.

2. Wet and Corrosive Locations: Entrances shall be threaded and fittings shall have gasketed covers. Provisions shall be made to drain the fittings and conduit system. Threaded fastening hardware shall be Type 316 stainless steel. Mounting brackets shall be hot dipped galvanized steel. Attachment and welded assemblies shall be hot dipped galvanized after fabrication.

Instrument, control cabinets, and other enclosures shall be NEMA 4X type 316 stainless steel unless hazardous location requirements apply.

Enclosures shall be mounted 1/4 inch from walls to provide air space, unless shown otherwise. Conduit systems shall be PVC-coated galvanized rigid steel conduits, fittings, and conduit boxes.

3. Wet, Corrosive, and Hazardous Locations: Electrical installations shall be suitable for wet and corrosive as described above and Class 1 , Division 1 or 2, Group C locations as required under Cal/OSHA Safety Orders (Title 8, CCR). Enclosures shall be NEMA Type 4X and 7. Requirements for fastening hardware, mounting channels, brackets, and conduit systems shall be same as wet and corrosive locations.

2.03 STANDARD PRODUCTS
A. Provide all new materials and equipment, free from any defects, in unblemished condition, and suitable for the space provided.

B. Where two or more units of the same class of material and/or equipment are required, provide products of a single manufacturer. Component parts of materials and/or equipment of the same manufacturer shall be preferred.

C. Provide materials and equipment of standard design and production. Provide the manufacturers' latest standard products that conform to these Specifications.

D. All materials and equipment shall be unused, of current manufacture, and of highest grade. All equipment and materials shall be of a proven type, and shall have a minimum of one year in service experience in similar service to that utilized in the Contract. No prototype equipment shall be installed. In addition, no equipment that is being phased out of manufacture by the supplier shall be installed.

E. The fabricator of major equipment assemblies, such as distribution panelboards, switchgear, MCCs, etc. shall also be the manufacturer of the major devices and components contained therein.

15.b
Packet Pg. 816 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 10

2.04 EQUIPMENT FINISH
A. Provide materials and equipment with manufacturers' standard finish system.

Provide manufacturers' standard finish color, except where specific color is indicated. If manufacturer has no standard color, finish equipment with ANSI No. 61, light gray color.

2.05 OUTDOOR EQUIPMENT
A. Provide equipment and devices to be installed outdoors capable of continuous operation within an ambient temperature range of 10 degrees F to 130 degrees F.

2.06 HAZARDOUS AREAS
A. Provide materials and equipment acceptable to the regulatory authority having jurisdiction for the Class, Division, and Group of hazardous area indicated.

2.07 SPECIAL TOOLS
B. The Contractor shall provide all special tools required for operation and maintenance of the equipment. The tools shall be considered as part of the product and become the property of Owner.

PART 3 EXECUTION

3.01 GENERAL
A. Install materials and equipment in a workmanlike manner utilizing craftsmen skilled in the particular trade. Installations shall have a neat and finished appearance.

Carry out Work in accordance with NECA National Electrical Installation Standards unless specified otherwise.

B. Coordinate electrical Work with the Engineer and Work of all other trades to avoid conflicts, errors, delays, and unnecessary interference with operation of the plant during construction.

C. The Contract Documents are not intended to show every offset and fitting, or every structural and mechanical obstruction that will be encountered during the installation of the Work. The alignment of equipment and raceways may be varied due to architectural changes, or to avoid work of other trades. Electrical system installations shall be integrated with all existing facilities and the work of other disciplines in this Contract. Accommodation of existing conditions and conditions developed by the Contractor shall be at no extra cost to Owner.

D. Raceway sizes, numbers of cables, and conductors, as shown on the Contract Documents, may vary in accordance with actual field conditions and equipment installed. The Contractor shall obtain the Engineer’s acceptance for any deviations.

E. Field Control of Location and Arrangement: The Drawings diagrammatically indicate the desired location and arrangement of outlets, conduit runs, equipment,

15.b
Packet Pg. 817 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 11
and other items. Exact locations shall be determined by the Contractor in the field based on the physical size and arrangement of equipment, finished elevations, required clearances, and other obstructions. Locations shown on the Contract Documents, however, shall be adhered to as closely as possible.

F. All conduit and equipment shall be installed in such a manner as to avoid all obstructions and to preserve head room and keep openings and passageways clear. Lighting fixtures, switches, convenience outlets, and similar items shall be located within finished rooms, as shown.

G. Where the Contract Documents do not indicate exact locations of conduit routing and equipment placement, the Contractor shall submit proposed locations to the Engineer for review. Where equipment is installed without instruction and the Engineer directs that it be relocated, it shall be moved as directed without additional cost to Owner.

H. All materials and equipment shall be installed in accordance with the recommendations of the manufacturer or as agreed by the Engineer. The installation shall be coordinated in the field with other trades so that interferences are avoided.

I. All Work, including installation, connection, calibration, testing, and adjustment shall be accomplished by qualified and experienced personnel working under continuous, competent supervision. The completed installation shall display competent work, reflecting adherence to prevailing industrial standards and methods.

J. All electrical installations with connections greater than 100 VA shall be performed by a C-10 Electrical Contractor licensed in the State of California.

K. All faulty electrical equipment shall be repaired or replaced by factory-trained representatives in a manner acceptable to the Engineer. Factory technical representatives shall be provided during start-up of all systems.

3.02 MATERIAL AND EQUIPMENT PROTECTION
A. All materials and equipment shall be covered or protected in such a manner that no finished surfaces are damaged, marred, or splattered with foreign material. All moving parts shall be kept clean and dry. The Contractor shall replace or have refinished by the manufacturer, all damaged materials and equipment at no expense to Owner.

B. All electrical equipment and skid mounted equipment shall be shipped in sealed dust- and moisture-proof plastic sheet enclosures.

C. Follow manufacturers' recommendations for handling, storage, and protection of material and equipment. Protect everything from the effects of weather, condensation, and corrosion. Before installation, store indoor equipment and equipment with electrical insulations such as motors in clean and dry indoor locations. Provide temporary power and heating acceptable to the Engineer, to prevent equipment condensation.

15.b
Packet Pg. 818 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 12
D. Protect equipment and material in a manner acceptable to the Engineer.

E. Cap conduit runs during construction with manufactured seals. Keep openings in boxes and equipment closed during construction.

3.03 MATERIAL AND EQUIPMENT INSTALLATION
A. Follow manufacturers' installation instructions explicitly. Wherever any conflict arises between the manufacturers' instructions, codes and regulations, and the Contract Documents, resolve the conflict and obtain acceptance by the Engineer.

Keep copy of manufacturers' installation instructions on the jobsite available for reference at all times.

B. Provide appropriate conduit and conductor entry fittings with enclosures to maintain the specified enclosure environmental capability after proper installation.

C. Motor Installation

1. The Contractor shall verify all actual motor full-load and locked-rotor current ratings. The minimum necessary equipment, wire, cable, and conduit sizes are shown on the Contract Documents. If the Contractor furnishes equipment with different ratings, the Contractor shall resize the motor branch circuit, contactor, and protective devices, as required, and submit for the Engineer’s acceptance.

2. Motors shall be protected from damage due to short circuit and overload conditions. Manufacturer’s published installation data shall be followed.

D. Equipment Installation

1. Equipment shall be anchored to accommodate all operating forces and seismic forces as specified in the latest seismic codes or parameters.

Equipment shall be secured in accordance with the manufacturer's recommendations and Contractor’s seismic restraint design and calculations. Embedded channels shall be installed to level switchgears, anchor enclosures as recommended by the manufacturer, or as shown on the Contract Documents.

2. Electrical equipment shall be secured with 1/2-inch Type 316 stainless steel concrete anchors or welded to floor channels as recommended by the manufacturer and seismic calculations. Equipment shall be installed level and aligned in place. Voids shall be filled with grout. Openings through slabs under equipment, wall, and ceiling shall be sealed around conduit with grout, synthetic rubber sealing compound, or other means acceptable to the Engineer. Conduit passing through these penetrations shall have both end openings sealed with conduit sealant acceptable to the Engineer.

3. Provide a 2” concrete equipment housekeeping pad for indoor electrical equipment. Outdoor electrical equipment shall be installed on a concrete pad at least 4 inches in height above the floor or grade, or as noted on the Contract Documents.

15.b
Packet Pg. 819 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 13

4. Holes made in existing and new structures to accommodate electrical installations shall be neatly formed without rough edges. Repairs to damage caused during installation shall be made in a manner acceptable to the Engineer.

E. Torque on Conductor Terminations: After installation and before energizing electrical equipment, each bolted bus and cable connection both factory and field installed shall be torqued to the manufacturer's recommended values.

3.04 REMOVAL OR RELOCATION OF MATERIALS AND EQUIPMENT
A. Where existing materials and equipment are removed or relocated, remove all materials no longer used such as studs, straps, conduits, and wires (entire length).

Remove or cut off concealed and embedded conduit, boxes, and other materials and equipment to a point at least 3/4 inch below the final finished surface and capped.

B. Repair affected surfaces to conform to the type, quality, and finish of the surrounding surface in a neat and workmanlike manner.

C. Existing electrical equipment that are removed shall be transported to locations designated by the City and shall be coordinated with the Engineer.

3.05 CUTTING AND PATCHING
A. Lay out Work carefully in advance. Do not cut, core-drill, and/or notch any structural member and building surface without specific acceptance by the Engineer. Carefully carry out any cutting, channeling, chasing, and drilling of floors, walls, partitions, ceilings, paving, and other surfaces required for the installation, support, and anchorage of conduit, raceways, and other electrical materials and equipment. Following such Work, restore surfaces neatly to original condition.

1. Prior to core-drilling and/or saw-cutting of existing concrete structures, verify with the Engineer whether X-ray testing is required for the related concrete area to identify embedded objects. Perform X-ray testing if directed so by the Engineer.

3.06 LOAD BALANCE
A. The Drawings show circuiting to electrical loads. Balance electrical load, if needed, among phases as nearly as possible on switchboards and panelboards. Submit the proposed changes to the Engineer in writing before proceeding.

3.07 PHASING SEQUENCE
A. Coordinate motor phasing checks with the Engineer. Submit a written report to the Engineer for each motor verifying that phasing has been checked for correct rotation.

3.08 CLEANING AND TOUCHUP PAINTING

15.b
Packet Pg. 820 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 14
A. Keep the premises free from accumulation of waste material and/or rubbish. Upon completion of Work, remove all materials, scraps, and debris from premises and from interior and exterior of all devices and equipment. Touch up scratches, scrapes, and chips in interior and exterior surfaces of devices and equipment with finishes matching as nearly as possible the type, color, consistency, and type of surface of the original finish. If extensive damage is done to equipment paint surfaces, refinish the entire equipment in a manner that provides a finish equal to the factory finish and acceptable to the Engineer.

B. All parts of the materials and equipment shall be thoroughly cleaned before energization. The equipment shall be left in a safe condition for Owner’s operations and maintenance personnel.

3.09 HAZARDOUS AREAS
A. Install all materials and equipment in hazardous areas in a manner acceptable to the regulatory authority having jurisdiction for the Class, Division, and Group of hazardous area indicated.

3.10 INSPECTION
A. Allow materials, equipment, and workmanship to be inspected at any time by the Engineer. Correct in a manner acceptable to the ENGINEER, work, materials, and equipment found to be not in accordance with the Contract Documents, and/or found to be deficient or defective.

3.11 SERVICE CONTINUITY
A. Maintain continuity of electric service to all functioning portions of the process and buildings during hours they are normally in use. Outages, if needed, shall be requested from City in writing. The requests shall include the reasons for outage, date, time, duration and equipment/system affected. The request for outage shall be made one week in advance. A pre-outage meeting shall be held between the Contractor and the City to review the impact on plant operation, safety, and other issues. Make no outages without written approval by City. All costs for temporary wiring and overtime work required for the outage shall be at no cost to City.

Remove all temporary wiring at the completion of the Work.

3.12 SHOP INSPECTION AND FACTORY DEMONSTRATION TESTS
A. Factory demonstration test (FDT) shall consist of FDT 1 and FDT 2 as described in Section 01660, Installation, Testing, Commissioning and Training.

B. The purpose of FDT 1 is for the manufacturer to pre-test the equipment at the manufacturer’s facility to ensure it meets the Contract Documents. The Engineer does not witness FDT 1. The equipment shall be inspected and tested by the manufacturer following the procedures accepted by the Engineer. After FDT 1, the Contractor shall submit a signed copy of the FDT 1 test report showing the equipment has been inspected, successfully tested, and deficiencies corrected.

15.b
Packet Pg. 821 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 15
C. The purpose of FDT 2 is for the Engineer and the City representative(s) to inspect and witness the testing of the electrical and instrumentation equipment at the manufacturer’s facility. Contractor shall schedule FDT 2 after FDT 1 test report is accepted by the Engineer. FDT 2 will be witnessed by the Engineer using FDT 1 test procedures to confirm the equipment meets the specified requirements. All deficiencies found shall be corrected prior to shipping the equipment.

D. The Contractor shall notify the Engineer in writing minimum two weeks before any scheduled shop inspection and FDT.

E. The Contractor shall be responsible for FDT performance. If the equipment being inspected and/or tested is not ready on Contractor’s specified date, or does not meet the test criteria, or does not meet the Contract requirements, re-inspection and/or retesting of the equipment may be required. The Contractor shall be responsible for the cost and schedule impacts, including the cost of transportation, labor, and accommodations of the engineer associated with re-inspection and/or re-witness the FDT. Owner’s costs incurred for re-inspection and/or retesting will be assessed through a deductive Contract change order.

F. The following equipment shall be shop inspected and witnessed tested:

1. Variable Frequency Drives

2. Large Complex Control panels (PLC and RIO panels for example)

3. Low-voltage motor control centers

4. Low Voltage Switchgear

5. Diesel Fueled Standby Engine Generator Set

3.13 CHECKOUT AND STARTUP
A. During checkout and startup of the various plant systems, provide a crew of skilled craftsmen to be at site for checkout and troubleshooting activities as required by the Engineer. Since coordination with other crafts and contractors will often be required, the craftsmen assigned to checkout shall be at site outside normal working hours, when necessary.

3.14 TESTS
A. General: Carry out tests specified herein and as indicated under individual items of materials and equipment specified in other Specification sections.

B. Perform tests in accordance with Section 01160 and Section 16080, Electrical Testing, to demonstrate that the equipment and systems operate in accordance with the requirements and intent of the Contract Documents. Perform the test in the presence of the Engineer. Furnish all test instruments and personnel required for the tests.

3.15 TRAINING

15.b
Packet Pg. 822 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL GENERAL PROVISIONS
CHLORINE CONVERSION PROJECT 16010- 16
A. Contractor shall conduct on-site training of newly installed and modified electrical equipment.

END OF SECTION

15.b
Packet Pg. 823 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 1
SECTION 16050

BASIC MATERIALS AND METHODS
PART 1 GENERAL

1.01 THE REQUIREMENT
A. The Contractor shall furnish all tools, equipment, materials, and supplies and shall perform all labor required to complete the Work as indicated in the Contract Documents.

1.02 RELATED WORK SPECIFIED ELSEWHERE
A. The requirements of the following sections, divisions and drawings apply to the Work of this Section. Other sections and divisions of the Specifications, not referenced below, shall also apply to the extent required for proper performance of this Work.

1. Section 16010, Electrical General Provisions

2. Section 16075, Electrical Identification Nameplates and Warning Signs

3. Section 16080, Electrical Testing

4. Section 16120, Conductors and Cables

5. Section 17405, Process Instrumentation and Control

6. Division 16, Electrical, other applicable sections

7. Division 17, Instrumentation and Control, other applicable sections B. All concrete work required for encasement, installation, and construction of the Work shall be as specified in Section 16010, Electrical General Provisions.

C. Components for heating, ventilating, air-conditioning systems, including conductors for control wiring, unless specifically shown on the Drawings.

D. Materials and equipment furnished and installed under other Divisions with raceway and electrical conductors furnished, installed and connected under Division 16, Electrical.

1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. All Work specified herein shall conform to or exceed the applicable requirements of the referenced portions of the following publications to the extent that the provisions thereof are not in conflict with other provisions of these Specifications.

B. Comply with the applicable editions of the following codes, regulations, and standards.

15.b
Packet Pg. 824 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 2

1. Code and Regulations
29 CFR 1910 Code of Federal Regulations, Title 29, Part 1910, U.S.

Occupational Safety and Health Standards (OSHA)
CCR California Code of Regulations, Title 8, Div. 1, Chap. 4, Subchapter 5, Electrical Safety Orders
CCR California Code of Regulations, Title 24, Part 3,
California Electrical Code
ADAAG Americans with Disabilities Act (ADA), Accessibility Guidelines for Buildings and Facilities.

NFPA 70 National Electrical Code (NEC)

2. Industry Standards
ANSI C80.1 Electrical Rigid Steel Conduit (ERSC)
ASTM E814 Standard Test Method for Fire Tests of Penetration Firestop Systems
IEEE C62.41.1 Guide on the Surge Environment in Low-Voltage (1000 V and Less) AC Power Circuits
IEEE C62.41.2 Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits
IEEE C62.45 Recommended Practice on Surge Testing for
Equipment Connected to Low-Voltage (1000 V and
Less) AC Power Circuits
NEMA ICS 2 Controllers, Contactors and Overload Relays Rated 600 V
NEMA LA 1 Surge Arresters
NEMA KS 1 Enclosed and Miscellaneous Distribution Equipment Switches (600 Volts Maximum)
NEMA PB 1 Panelboards
NEMA VE 1 Metal Cable Tray Systems
NEMA WD 1 General Color Requirements for Wiring Devices UL 467 Grounding and Bonding Equipment
UL 489 Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit-Breaker Enclosures

15.b
Packet Pg. 825 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 3
UL 943 Ground-Fault Circuit-Interrupters
UL 1449 Surge Protective Devices
UL 1479 Standard for Fire Tests of Through-Penetration
Firestops
W-C-596G Federal Specifications, General Specification for Connector, Electrical, Power
W-S-896F Federal Specifications, Switches, Toggle (Toggle and Lock), Flush Mounted (General Specification)

3. Other Standards
ANSI American National Standards Institute
ICEA Wire and Cable standards
IEEE Institute of Electrical and Electronics Engineers
NEMA National Electrical Manufacturers Association

1.04 CONTRACTOR SUBMITTALS
A. Submittals shall be made in accordance with the General Requirements, Additional General Requirements, and as specified herein. Refer to Section 16010, Electrical General Provisions, for submittal requirements.

1.05 QUALITY ASSURANCE
A. Comply with the requirements specified herein and the applicable reference Specifications of the General Requirements and Additional General Requirements.

PART 2 PRODUCTS

2.01 MATERIAL LISTING
A. All equipment and material shall be listed by Underwriters Laboratories, Incorporated and bear the UL label or an OSHA-recognized testing laboratory acceptable to the Engineer.

2.02 SERVICE ENTRANCE
A. Provide labor and furnish equipment as required by the electric utility, which shall provide service to the facility. All such materials and work shall meet the requirements of the utility company.

B. Provide temporary service for construction tools and testing apparatus during construction.

2.03 HAZARDOUS AREAS

15.b
Packet Pg. 826 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 4
C. Provide devices, materials, and equipment listed for installation in hazardous areas of the Class, Division, and Group indicated.

2.04 OUTLET AND DEVICE BOXES
A. General: Provide boxes not less than 2 inches deep, unless shallower boxes are required by structural conditions and are specifically accepted by the Engineer. Do not use box extensions to provide wiring space required by the NEC and California Electrical Code. For hollow masonry construction, provide boxes of sufficient depth so that conduit knockouts and hubs are in the masonry void space.

B. Sheet Steel Boxes: Provide zinc-plated or cadmium-plated boxes of the one-piece drawn type. Install 4-inch minimum octagonal boxes for ceiling outlets, except where smaller boxes are required for the particular fixture being installed. Provide concrete type boxes in poured concrete slabs. Provide 4 inches by 4 inches minimum boxes with 3/4-inch knockouts for switches and receptacles. Provide plaster rings where required.

C. Cast Steel Boxes: Provide boxes of cast ferrous metal with gasketed, watertight, cast ferrous metal covers and stainless steel screws. Provide boxes with threaded conduit hubs and cast mounting lugs where lugs are required. Provide Type FS or FD boxes as manufactured by Crouse-Hinds, Appleton, or equal.

D. PVC-Coated Cast Steel Boxes: PVC-coated cast steel boxes shall meet the requirements of UL 514B and the NEC. Boxes shall be cast steel. The exterior PVC coating of the box shall have nominal thickness of 40 mils bonded to the box.

The PVC coating shall be UV-resistant. The interior surfaces shall be lined with corrosion resistant coating to a nominal thickness of 2 mils. Box cover shall be PVC-coated steel and secured with Type 316 stainless steel screws.

E. Provide a box suitable for the conditions at each outlet in the wiring or raceway system and sized in accordance with the NEC and California Electrical Code.

F. Unless otherwise indicated on the Contract Documents, device boxes and junction boxes shall be heavy duty and compatible with the location and conduit system being used. Types to be provided shall be as follows:

15.b
Packet Pg. 827 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 5
Location Box Type
Inside office buildings (indoors dry
location)
Hot-dipped galvanized sheet steel
Inside electrical room (indoors dry
location)
Cast steel for surface-mounted; hot-dipped
galvanized sheet steel for inside concrete
block wall
Wet and corrosive area (outdoors,
electrical room basement, pump room,
and tunnels)
PVC-coated cast steel
Encased in concrete or concealed Cast steel
Wet, corrosive, and hazardous PVC-coated cast steel (with factory sealed or explosion-proof devices)
G. Device Plates: Types to be provided:

Location Plate Type
General purpose Stainless steel
Wet and corrosive Type 316 stainless steel with gasket or PVC-coated cast steel

2.05 JUNCTION AND PULL BOXES
A. Provide NEMA 4X PVC-coated or Type 316 stainless steel enclosures for wet and corrosive locations as well as where subscript WP is indicated on the Drawings.

B. Where outlet boxes are used as junction or pull boxes, provide materials as specified in Article entitled “Outlet and Device Boxes” of this Specification.

C. Where larger sheet steel boxes are required, provide boxes of code-gauge, galvanized steel for general purpose dry locations or NEMA 4X Type 316 stainless steel in wet and corrosive areas. All boxes shall be hinged and have full-access screw covers with Type 316 stainless steel machine screws and hardware.

D. Provide concrete boxes of reinforced, cast concrete, 10 inches by 17 inches minimum inside dimensions, Brooks Products, Inc., No. 3-1/2T, Quikset W.17 Associated, or equal. Mark cast iron cover, per OWNER’s standards.

E. Provide special boxes where indicated on the Drawings.

2.06 TERMINAL JUNCTION BOXES

15.b
Packet Pg. 828 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 6
A. Provide hinged-cover terminal junction boxes of the required type and size where indicated. Provide NEMA 1 gasketed or NEMA 12 enclosures for general purpose dry locations. Provide NEMA 4X Type 316 stainless steel enclosures for wet and corrosive locations and where subscript WP is indicated at the box location on the Drawings. Provide terminal blocks with a separate connection point for each conductor entering or leaving the box. Where 277-480V, 120-240V and/or <50V conductors enter the same terminal junction box, supply full depth 16 gauge metal dividers between the differing voltage terminals. Provide 25 percent spare terminal points for OWNER’s use following completion of installation. Paint interior surfaces white for NEMA 1 or NEMA 12 boxes.

2.07 TELEPHONE TERMINAL CABINETS OR BACKBOARDS (NOT IN CONTRACT)

2.08 LIGHTING AND POWER DISTRIBUTION PANELBOARDS
A. General: Provide circuit breaker panelboards meeting standards established by UL, NEMA PB 1, NEC and California Electrical Code. Where used as service entrance equipment, provide panels UL-labeled for that use. Furnish panels with fully rated short circuit current equipment rating. Series connected equipment ratings shall not be acceptable. Provide panels rated for connection to an electric system having an available amperes rms symmetrical short circuit current of 10,000 minimum or the indicated value at 208Y/120 or 120/240 V and 14,000 minimum or the indicated value at 480Y/277 V. Provide panelboards and circuit breakers suitable for use with 75 degrees C wire at full NEC 75 degrees C ampacity.

B. Cabinets: Furnish boxes large enough to provide a minimum wiring gutter space on both sides and top and bottom of 4 inches by 4 inches minimum. Provide flush and surface mounted boxes as indicated manufactured with reinforced steel frame and code-gauge, hot-dip galvanized sheet steel. Provide front trim the same size as the box for surface mounted panelboards and 3/4 inch larger all around than the box for flush mounted panelboards. Panel covers shall be installed with direct screw connections. Adjustable clamps shall not be used. Provide fronts having doors with concealed hinges and flush type lock and catch device. Provide multipoint locking devices for all doors over 30 inches in height. Key all door locks alike, and furnish two keys with each lock. Furnish on door interior a metal directory frame with transparent plastic face and enclosed directory card. Furnish an engraved, laminated plastic nameplate in accordance with Section 16075, Electrical Identification Nameplates and Warning Signs.

C. Interiors

1. Furnished factory-assembled panelboard interiors complete with circuit breakers as shown. In addition, space for future circuit breakers shall be provided with easily removable front cover. Provide panelboards with interiors designed so that circuit breakers can be replaced without disturbing adjacent circuit breakers and without removing the main bus.

15.b
Packet Pg. 829 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 7

2. Provide copper bus bars full sized throughout their length. Make complete provisions for mounting future circuit breakers throughout the full length of the bus. Provide all machining, drilling, and tapping required to add and/or to change circuit breakers in the future. Bolt together and rigidly support bus bars and connection straps on molded insulators.

3. Furnish an insulated neutral bus bar rated the same as the phase bus bars and having at least one terminal screw for each branch circuit. Furnish a copper ground bus bar installed on the panelboard frame, bonded to the box, and containing at least one terminal screw for each circuit. Provide solderless main lugs for main (where indicated), neutral, and ground bus bars. Provide sub-feed and thru-feed lugs where indicated. Provide lugs and connection points on phase, neutral, and ground buses suitable for copper conductors.

D. Circuit Breakers

1. Furnish indicating type molded circuit breakers providing ON/OFF and TRIPPED positions of the operating handle. Furnish thermal magnetic, quick-make, quick-break circuit breakers. Do not use tandem and/or dual circuit breakers in normal single-pole spaces. Do not use single-pole circuit breakers with handle ties where multipole circuit breakers are indicated.

Provide multipole circuit breakers designed so that an overload or short circuit on one pole automatically causes all poles to open. Provide circuit breakers meeting requirements of UL 489. Install bolt-on circuit breakers in all panelboards. Provide circuit breaker handle padlocking provisions to lock the circuit breaker in the OFF position.

2. Where ground fault interrupter (GFI) circuit breakers are indicated or required by the NEC, provide a unit containing a conventional thermal magnetic trip and a ground fault sensor rated to trip the circuit breaker in approximately 0.025 second for a 5 mA ground fault (UL Class A sensitivity). Provide a ground fault sensor having the same rating as the circuit breaker and having a push-to-test button.

3. Manufacturers: Cutler-Hammer, General Electric, Square D, or equal.

E. Circuit Breakers, Individual, 600 V and Less

1. Mount individual circuit breakers in NEMA 12 enclosure unless otherwise indicated. Provide NEMA 4X, Type 316 stainless steel enclosures for circuit breakers mounted in wet and corrosive areas and wherever the subscript WP is indicated on the Drawings. Provide circuit breakers with handles that can be pad-locked in the OFF position. Interlock enclosure and circuit breaker to prevent opening the cover with the circuit breaker in the ON position. Provide quick-make, quick-break, thermal magnetic circuit breakers of the indicating type showing ON/OFF and TRIPPED positions of the operating handle. Do not use single-pole circuit breakers with handle ties where multipole circuit breakers are indicated. Provide multipole circuit breakers designed so that an overload or short circuit on one pole automatically causes all poles to open. Provide circuit breakers meeting

15.b
Packet Pg. 830 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 8
the requirements of UL 489 that have a minimum interrupting rating as indicated. Where circuit breakers are used as service entrance equipment, provide units UL-labeled for that use. Provide circuit breakers with terminals suitable for use with 75 degrees C wire at full NEC 75 degrees C ampacity.

2.09 FUSED SWITCHES, INDIVIDUAL, 600 V AND LESS
A. Mount individual fused switches in NEMA 12 enclosures unless otherwise indicated. Provide NEMA 4X, Type 316 stainless steel enclosures for fused switches mounted in wet and corrosive area. Provide fused switches that can be pad-locked in the OFF position. Interlock enclosure and switch to prevent opening the cover with the switch in the ON position. Provide fused switches, quick-make, quick-break, motor rated, load-break, heavy-duty (HD) type having external marking clearly indicating ON and OFF positions. Provide fuses of the current ratings indicated and types specified herein. Provide fuse mountings that reject Class H fuses and accept only the current-limiting fuses specified. Provide fused switches meeting the requirements of NEMA KS 1, UL-listed for application to a system having an available short circuit current as indicated. Provide switches with terminals suitable for use with 75 degrees C wire at full NEC 75 degrees C ampacity.

2.10 FUSES, 600 V AND LESS
A. Provide a complete set of current-limiting fuses and a set of spare fuses wherever fuses are indicated. Provide a listing of quantities of each type and each current rating installed. Provide fuses that fit mountings specified with switches and which provide features rejecting Class H fuses. Provide the following types:

1. For motor and transformer fuses rated 600 V, 600 A and below, provide UL Class RK-1 with time delay, Bussmann Type LPS-RK, Shawmut Type A6DR, or equal.

2. For motor and transformer fuses rated 250 V, 600 A and below, provide UL Class RK-1 with time delay, Bussmann Type LPN-RK, Shawmut Type A2D-R, or equal.

3. For feeder and service fuses rated 600 V, 600 A and below, provide UL Class RK-1, Bussmann Type KTS-R, Shawmut Type A6K-R, or equal.

4. For feeder and service fuses rated 250 V, 600 A and below, provide UL Class RK-1, Bussmann Type KTN-R, Shawmut Type A2K-R, or equal.

5. For feeder and service fuses rated 600 V, 601 to 6,000 A, provide UL Class L, Bussmann Type KRP-C, Shawmut Type A4BY, or equal.

2.11 LOCAL CONTROL STATIONS, PUSHBUTTONS, INDICATING LIGHTS, AND

SELECTOR SWITCHES

15.b
Packet Pg. 831 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 9
A. For general purpose dry locations, provide heavy-duty, 30 mm, and oil-tight type pushbuttons, indicating lights, and selector switches. Provide General Electric Type CR 104P, an equivalent by Square D, Cutler-Hammer, or equal.

B. For wet and corrosive locations, provide heavy-duty, 30 mm, and corrosionresistant, watertight type pushbuttons, indicating lights, and selector switches mounted in NEMA 4X, Type 316 stainless steel watertight enclosures. Provide Square D Type SK, an equivalent by General Electric, Cutler-Hammer, or equal.

C. Install provisions for pushbuttons and selector switches padlockable in the OFF position wherever lockout provisions are indicated on the Contract Documents.

Material shall be Type 316 stainless steel.

D. For wet, corrosive, and hazardous locations, local control station enclosures for push buttons, indicating lights and selector switches shall be listed for classified areas and shall be in compliance with NEC Article 500.

E. Provide selector switches having standard bat-lever gloved-hand spring-return operating levers.

F. Indicating lights shall be heavy-duty, 30 mm, and oil-tight (NEMA 13) for indoors and water tight (NEMA 4X) for outdoors. Indicating lights for 120 V ac applications shall be 120 V ac, push-to-test, LED, transformer type. Indicating lights for 125 V dc applications shall be 125 V dc, push-to-test, LED type. Each light shall have a screwed-on plastic prismatic lens approximately 1 inch in diameter. Each light shall have a factory-engraved legend plate, as shown on the Contract Documents.

Indicating lights shall be General Electric Type CR104, Square D Class 9001 Type SK and K, Allen-Bradley 800T and 800H series, or equal.

G. Pushbuttons and selector switches shall be heavy duty, 30 mm, and oiltight/watertight devices. “JOG / LOCKOUT-STOP” pushbutton stations shall be installed adjacent to each motor unless specifically indicated otherwise on the Contract Documents. The JOG pushbutton shall not have any attachment to hold the pushbutton from depressed position. The LOCKOUT-STOP pushbutton shall have a padlockable Type 316 stainless steel latch which swings up or down to keep the pushbutton depressed.

H. Emergency stop pushbuttons shall have a large, red mushroom head, maintained contacts, push-to-stop, pull-to-reset, Allen-Bradley Bulletin 800T, General Electric CR104P, or equal.

2.12 TERMINAL BLOCKS 600 V AND LESS
A. Provide 600 V terminal blocks for termination of all power and 120 V control circuits entering or leaving electrical equipment, panels, and/or boxes. Provide screw clamp compression, dead front barrier type terminal blocks. For instrumentation and control terminal block requirements, refer to Section 17405, Process Instrumentation and Control.

15.b
Packet Pg. 832 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 10
B. Size all terminal block components to allow insertion of all necessary wire sizes and types. Supply terminal blocks with marking system allowing the use of preprinted or field-marked tags. Supply CSA-certified or UL-listed terminal blocks manufactured by Weidmuller, Ideal, Electrovert, or equal. Provide terminal blocks with 25 percent spare termination points for OWNER’s use following completion of installation.

2.13 CONTROL RELAYS
A. Open frame industrial relays shall not be used unless accepted by the Engineer.

Provide magnetic control relays with operating coils of the proper voltage rating as required by the control circuit, NEMA Class A300 (300 V, 10 A continuous, 7,200 VA make, 720 VA break), industrial control type with field convertible contacts, and meeting the requirements of NEMA ICS 2. Provide Cutler-Hammer Type M-300, General Electric Type CR120A, or equal.

B. Where time delay relays are specified or required provide magnetic control relays with an electronic timer adjustable over the range specified on the Drawings.

C. Where latching (mechanically held) relays or motor thermal detector relays are specified, provide magnetic control relays with mechanical latch attachment with unlatching coil and coil clearing contacts. Provide an attachment allowing easy manual latching and unlatching.

D. Intrinsically safe relays and other control relays shall be as described in Section 17405, Process Instrumentation and Control.

2.14 LOW-VOLTAGE SURGE PROTECTIVE EQUIPMENT
A. Provide secondary surge protective equipment located where indicated on the Drawings. Provide components for all surge protective equipment covered by this Specification, designed and tested in accordance with UL 1449, NEMA LA-1, IEEE C62.41.1, IEEE C62.41.2 and IEEE C62.45.

B. Surge capacitor, if used, shall be impregnated with non-PCB biodegradable dielectric fluid. Include an integral discharge resistor, which shall drain the residual voltage to 50 volts crest in less than 5 minutes after the unit has been disconnected from the circuit.

2.15 ENCLOSURE PAINT AND FINISH
A. All metallic enclosures, except for stainless steel, shall be painted in accordance with manufacturer’s standard. Exterior color shall be ANSI No. 61.

PART 3 EXECUTION

3.01 OUTLET AND DEVICE BOXES
A. Installation: Mount boxes at the following heights unless otherwise required by Americans with Disabilities Act (ADA), (heights shall be to the centerline of the box):

15.b
Packet Pg. 833 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 11
Wall Switches and Receptacles: 48 inches above floor.

Thermostats: 54 inches above floor.

Wall Telephone Outlets: 6 inches above counter tops; about 18 inches above floor.

Wall Mounted Telephone: 52 inches above floor for standard wall telephone.

Office Receptacles: Flush device plate bottom or side with top of the backsplash on use areas, halls, etc. or 6 inches
above counter tops without backsplash; about 18
inches above floor.

1. Where above heights do not suit the building construction or finish, locate boxes where directed by the Engineer.

2. Locations indicated are approximate. Study the Drawings in relation to spaces and equipment surrounding each outlet. When necessary, with the acceptance by the Engineer, relocate outlets to avoid interference with mechanical equipment and/or structural features. Locate all light switches on lock side of doors. Locate all light fixture outlets in a symmetrical pattern according to the room layout unless otherwise indicated.

3. Mount all boxes plumb and level. Provide flush-mounted boxes with concealed conduits. Make edges of boxes flush with finished surface.

Provide proper type extension rings or plaster covers for this purpose. For flush-mounted boxes, make holes in the surrounding surface no larger than required to receive the box.

4. Install boxes in a secure, substantial manner supported independently of conduit by attaching to the building structure or a structural member.

Fasten boxes with bolts and expansion anchors on concrete or brick, toggle bolts on hollow masonry units, and machine screws or welded, threaded studs on steelwork. No powder actuated tools shall be permissible. Boxes embedded in concrete or masonry need not be additionally supported.

Provide galvanized mounting hardware for general purpose dry locations and Type 316 stainless steel mounting hardware in wet and corrosive areas.

5. Provide flush or recessed lighting fixtures with separate junction boxes when required by the fixture terminal temperature. Where boxes support fixtures, provide proper means of attachment with adequate strength.

6. Seal all unused openings in any type of boxes.

3.02 AND PULL BOXES

15.b
Packet Pg. 834 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 12
A. Where indicated on the Drawings, and where necessary to terminate, tap-off, or redirect multiple conduit runs, provide and install appropriately designed junction boxes. Furnish and install pull boxes where necessary in the raceway system to facilitate conductor installation. Provide pull boxes to limit conduit runs to less than 150 feet and to contain no more than the equivalent of three right-angle bends unless accepted by the Engineer.

1. Types to be provided:
a. Provide boxes of the types listed for specific locations as described above in Article entitled “Outlet and Device Boxes” of this Specification.
b. Provide outlet boxes as junction boxes and pull boxes wherever possible and allowed by applicable codes.

2. Installation
a. Make all boxes accessible. Do not install boxes in finished areas unless accepted by the Engineer. Mount all boxes plumb and level.

Provide flush-mounted boxes with concealed conduits. Make edges of recessed boxes flush with the final surface.
b. Mount boxes in a secure, substantial manner supported independently of conduit by attachment to the building structure or a structural member. Fasten boxes with bolts and expansion shields on concrete or brick, toggle bolts on hollow masonry units, and machine screws or welded, threaded studs on steelwork. No power actuated tools shall be allowed. Threaded studs driven in by a powder charge and provided with lock washers and nuts shall be acceptable in lieu of expansion shields. Boxes embedded in concrete or masonry need not be additionally supported. Provide galvanized mounting hardware in general purpose dry locations and Type 316 stainless steel mounting hardware in wet and corrosive areas.
c. Install boxes for conduits under grade flush with finished grade in locations outside of paved areas, roadways, and walkways. d. If adjacent structure is available, the box may be mounted on the structure surface just above finished grade in accessible but unobtrusive location. If it is found desirable to locate boxes in paved areas, roadways, or walkways, obtain Engineer's written acceptance and provide boxes and covers suitable for the weights to which they may be subjected.

3.03 TERMINAL JUNCTION BOXES
A. Install in accordance with all the requirements detailed herein. Label each block and terminal with a permanently attached, non-destructible tag. Label text shall match as-built documentation.

3.04 LOW-VOLTAGE SURGE PROTECTIVE EQUIPMENT

15.b
Packet Pg. 835 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 13
A. Surge Protective Devices (SPD) shall be installed as shown on the Drawings.

END OF SECTION

15.b
Packet Pg. 836 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO BASIC ELECTRIC MATERIALS AND METHODS
CHLORINE CONVERSION PROJECT 16050- 14
This Page Intentionally Left Blank

15.b
Packet Pg. 837 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO GROUNDING AND BONDING
CHLORINE CONVERSION PROJECT 16060-1
SECTION 16060

GROUNDING AND BONDING
PART 1 GENERAL

1.01 THE REQUIREMENT
A. The Contractor shall furnish all tools, equipment, materials, and supplies and shall perform all labor required to complete the Work as indicated on the Contract Documents and specified herein.

B. Electrical grounding and bonding systems shall be installed as indicated herein and in the Contract Documents with materials including cables/wires, connectors, solderless lug terminals, grounding electrodes, bonding jumpers, exothermic connections, and additional accessories needed for a complete installation. Where materials or components are not indicated, provide products which comply with NEC, UL, and IEEE requirements and install in accordance with established industry standards.

C. System ground conductors shall run continuously in duct banks and cable trays, through manholes, handholes, and other raceways. The system ground conductor shall be connected to the structure grounding systems to provide a continuous ground system.

1.02 RELATED WORK SPECIFIED ELSEWHERE
A. The requirements of the following sections and divisions apply to the Work of this Section. Other sections and divisions of the Specifications, not referenced below, shall also apply to the extent required for proper performance of this Work.

1. Section 16080, Electrical Testing

2. Section 16120, Conductors and Cables

3. Section 17405, Process Instrumentation and Control

4. Division 16, Electrical, other applicable sections

5. Division 17, Instrumentation and Control, applicable sections

1.03 REFERENCED SPECIFICATIONS, CODES, AND STANDARDS
A. All Work specified herein shall conform to or exceed the applicable requirements of the referenced portions of the following publications to the extent that the provisions thereof are not in conflict with other provisions of these Specifications.

B. Comply with the applicable editions of the following codes, regulations, and standards:

1. Codes and Regulations

15.b
Packet Pg. 838 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO GROUNDING AND BONDING
CHLORINE CONVERSION PROJECT 16060-2
CCR California Code of Regulations, Title 8, Div. 1, Chap. 4, Subchapter 5, Electrical Safety Orders
CCR California Code of Regulations Title 24, Part 3 California Electrical Code (CEC)
NFPA 70 National Electrical Code (NEC)

2. Industry Standards
IEEE 80 Guide for Safety in AC Substation Grounding
IEEE 142 Recommended Practice for Grounding of Industrial and Commercial Power Systems
UL 467 Grounding and Bonding Equipment
UL 486A-486B Wire Connectors
IEEE 837 Qualifying Permanent Connections Used in Substation Grounding

3. Other Standards
IEEE Institute of Electrical and Electronics Engineers
UL Underwriters Laboratories
C. Comply with the applicable reference Specifications as directed in the General Requirements and the Additional General Requirements.

1.04 CONTRACTOR SUBMITTALS
A. Submittals shall be made in accordance with the General Requirements, Additional General Requirements, and as specified herein.

B. Submittals shall include the following:

1. Catalog literature for all products

2. Certified copies of ground test results

1.05 QUALITY ASSURANCE
A. General: Comply with the requirements specified herein and the applicable reference Specifications of the General Requirements, and Additional General Requirements.

B. Contractor Qualifications: Comply with the requirements for the certifications, licenses, training, skills, experience, and other qualifications specified in Part 1, Article entitled “Contractor Submittals” of this Specification.

PART 2 PRODUCTS

2.01 MATERIAL CERTIFICATION

15.b
Packet Pg. 839 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO GROUNDING AND BONDING
CHLORINE CONVERSION PROJECT 16060-3
A. All material furnished by the Contractor shall be listed by and shall bear the label of UL or an OSHA-recognized testing laboratory acceptable to the Engineer.

2.02 GROUND CONDUCTORS
A. Install copper grounding conductors of the size shown on the Drawings and the type specified in Section 16120, Conductors and Cables. In no case shall the size of any grounding conductor be less than that stipulated by the NEC and California Electrical Code for that specific application.

2.03 GROUND CONNECTIONS
A. For above grade connections, provide compression or bolted connectors.

PART 3 EXECUTION

3.01 GENERAL
A. All control panel and electrical equipment ground buses and structural steel shall be connected to the ground grid system by dedicated ground conductors. The minimum size of the grounding conductor branching off from the ground grid system to major electrical distribution equipment and structures shall be as follows:

1. Other Equipment: In accordance with NEC and California Electrical Code B. Devices associated with the electrical, control, and instrumentation systems shall be bonded to this ground grid system by copper ground conductors.

C. The electrical system neutral of an equipment and each separately derived system neutral shall be grounded to the ground grid system.

D. All equipment and device grounding conductors shall consist of a separate insulated grounding conductor run in the conduit or multiconductor cable from the equipment or device to the system ground. A separate equipment grounding conductor, in addition to the cable shields, shall be provided in each raceway containing medium-voltage power cables.

E. The Contractor shall terminate feeder and branch circuit insulated equipment-grounding conductors with grounding lugs or bushings.

F. Cable tray systems, conduits, ground conductors in raceways, and cable ground shall be grounded to the grounding system in accordance with NEC, California Electrical Code, or the Contract Documents, whichever is more stringent.

G. The Contractor shall tighten grounding and bonding connectors and terminals, including screws and bolts, to the manufacturers recommended torque values.

Where manufacturer’s torque values do not exist, comply with torque values specified in UL 486A-486B.

15.b
Packet Pg. 840 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO GROUNDING AND BONDING
CHLORINE CONVERSION PROJECT 16060-4
H. Equipment enclosures shall be grounded. Control panel enclosure doors shall be grounded using a dedicated grounding conductor. A control panel enclosure door shall not be considered effectively grounded through the hinge system alone.

I. Ground conductors on equipment shall be formed to the contour of the equipment and firmly supported. Ground wire 6 AWG and smaller subject to mechanical damage shall be run in a Schedule 80 PVC conduit up to 18 inches above grade.

J. All ground connection hardware, bolts, and nuts shall be high-strength, highconductivity copper alloy.

K. If an equipment ground conductor (sized per NEC or larger) is routed inside a liquid tight flexible conduit, a separate ground conductor shall not be needed on the outside of the conduit.

3.02 GROUNDING CONNECTIONS
A. When making exothermic welds, wire brush or file the point of contact to a bare metal surface. Provide exothermic welding cartridges and molds in accordance with the manufacturer's recommendations. After welds have been made and cooled, brush slag from the weld area and thoroughly clean the joint.

B. Provide connectors of proper size for conductors and ground rods specified.

Provide connector manufacturer's compression tool.

C. Notify the Engineer prior to backfilling any ground connections.

3.03 FIELD TESTS
A. The grounding system shall be tested in accordance with Specification section 16080, Electrical Testing.

END OF SECTION

15.b
Packet Pg. 841 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL IDENIFICATION NAMEPLATES
CHLORINE CONVERSION PROJECT 16075- 1
SECTION 16075

ELECTRICAL IDENTIFICATION NAMEPLATES AND WARNING SIGNS
PART 1 GENERAL

1.01 THE REQUIREMENT
A. The Contractor shall furnish all tools, equipment, material, and supplies and perform all labor required to install nameplates and/or warning signs to identify electrical equipment as indicated on the Drawings and specified herein.

B. There is no job number for this project as it is the first job to use extensive tags.

1.02 RELATED WORK SPECIFIED ELSEWHERE
A. The requirements of the following sections and divisions apply to the Work of this Section. Other sections and divisions of the Specifications, not referenced below, shall also apply to the extent required for proper performance of this Work.

1. Section 16120, Conductors and Cables

2. Section 16130, Raceway Systems and Pull Boxes

3. Division 16, Electrical, other applicable sections

4. Division 17, Instrumentation and Control, other applicable sections

1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. All Work specified herein shall conform to or exceed the applicable requirements of the referenced portions of the following publications to the extent that the provisions thereof are not in conflict with other provisions of these Specifications.

B. Comply with the applicable editions of the following codes, regulations, and standards:

1. Codes and Regulations
29 CFR 1910 Code of Federal Regulations, Title 29, Part 1910, U.S.

Occupational Safety and Health Standards (OSHA)
CCR California Code of Regulations, Title 8, Div. 1, Chap. 4, Subchapter 5, Electrical Safety Orders
CCR California Code of Regulations, Title 8, Industrial Relations (Cal/OSHA), other applicable provisions
CCR California Code of Regulations Title 24, Part 3 California Electrical Code (CEC)
NFPA 70 National Electrical Code (NEC)

15.b
Packet Pg. 842 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL IDENIFICATION NAMEPLATES
CHLORINE CONVERSION PROJECT 16075- 2

2. Industry Standard
IEEE C37.2 Electrical Power System Device Function Numbers, Acronyms, and Contact Designations
C. Comply with the applicable reference Specifications as specified in the Electrical General Provisions, Section 16010.

PART 2 PRODUCTS

2.01 NAMEPLATES AND WARNING SIGNS
A. Nameplates: Nameplates for indoor electrical equipment shall be black lamicoid with white letters. They shall be fastened with round head stainless steel screws.

Nameplates for outdoor electrical equipment shall be engraved or laser etched Type 316 stainless steel and fastened with General Electric (GE) Silicone II sealant, or equal. At locations where fastening the nameplate with screw is not practical (such as behind front door of equipment or explosion-proof enclosure), use GE Silicone II Sealant, or equal.

1. Any equipment for which a nameplate is required, but not shown on the Contract Documents, the Contractor shall request in writing such nameplate legend from the Engineer.

2. The nameplates shall be installed on the front and back of the enclosure (if backside access is available) to clearly identify each compartment, power source, etc. This shall apply to all equipment installed and/or modified per the Contract Documents.

3. All electrical equipment shall have a large equipment nameplate with 3/4 inch high letters for the designation given on the Contract Documents. All motor controllers or individual units within MCCs and switchgear shall have a nameplate with 1/4 inch high letters mounted to the outside of the enclosure, showing the circuit number and equipment designation in accordance with the Contract Documents.

4. All control panels and terminal board panels shall have large equipment nameplates with 3/4 inch high letters for the panel designation, and nameplates with 3/16 inch high letters for each control and indicating device in accordance with the Contract Documents.

5. Visible, permanent engraved nameplates shall be provided by Contractor identifying each instrument, relay, switch, indicating light, circuit breaker compartment, potential transformer compartment, fuse block, and auxiliary compartment. Devices mounted inside the compartment shall also be identified with engraved nameplates. Equipment and terminal blocks within control panels, boxes and compartments shall be permanently identified with engraved nameplates. This shall include the backside of door- or panel-mounted items. The backside engraved nameplate shall read the same as the front engraved nameplate. Protective relays shall be designated as to use, the phase to which connected and shall include the

15.b
Packet Pg. 843 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL IDENIFICATION NAMEPLATES
CHLORINE CONVERSION PROJECT 16075- 3
IEEE C37.2 device function number; e.g., Phase A Overcurrent Relay, Device 51.

6. All pilot device legend plates, whether located on MCC compartment door, control panels, or as part of field control stations, shall receive legend plates made of lamicoid material (indoors) or stainless steel (outdoors), mounted above the pilot device with minimum two line identification. First line shall indicate loop tag number and the next line the function description, such as ON, OFF, RESET, etc.

B. Warning Signs: All warning signs shall be in accordance with OSHA regulations and shall be suitable for exterior use when installed outdoors. The warning signs shall be fastened with methods described above. All warning signs shall be 7 inches high by 10 inches wide unless otherwise noted in the Contract Documents, and on 1/16-inch thick plastic or similar material acceptable to the Engineer. The signs specified below shall be installed on the front and back of the enclosure (if backside access is available to the enclosure) of each electrical distribution equipment and control equipment to clearly identify each compartment, power source, etc. This shall apply to all equipment installed and/or modified per the Contract Documents.

1. Permanent and conspicuous warning signs shall be mounted on all equipment, doorways to equipment rooms, pull boxes, manholes, etc. where the operating voltage exceeds 600 V, including utility equipment by the utility company. High-voltage warning signs shall be colored red with white lettering and shall read:

DANGER
VOLTS

KEEP OUT

2. Rear access panels or doors of cubicles containing power conductors shall include a large DANGER … VOLTS INSIDE nameplate of red background and 1-inch high minimum white lettering.

3. Permanent warning signs shall be mounted at all mechanical equipment which can be started automatically or be started from remote locations.

Automatic or remote controlled equipment warning signs shall be colored yellow with black lettering and shall read:

CAUTION

THIS EQUIPMENT STARTS

AUTOMATICALLY OR

BY REMOTE CONTROL

2.02 CONDUIT, CABLE TRAY, MULTICONDUCTOR CABLE, AND CONDUCTOR

IDENTIFICATION
A. Conduit and Cable Tray Tags

15.b
Packet Pg. 844 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL IDENIFICATION NAMEPLATES
CHLORINE CONVERSION PROJECT 16075- 4

1. Conduits shall be tagged at all terminations and every 50 feet along the exposed conduit route. Each segment of a cable tray system shall be tagged at each tray segment end and every 50 feet along the route.

Conduits and tray segments shall also be tagged where the conduits and/or conductors enter an underground installation and/or penetrate a wall. The conduit and cable tray numbering systems shall provide for the unique designation of each conduit and tray as shown in the Contract Documents.

2. Each conduit number shall consist of two parts:

Job No. - Conduit ID
Job No. shall be made up of the Job No. with no hyphens. Some projects do not have a Job Number and this portion of the conduit number is deleted.

Conduit ID shall be made up of Conductor Service + Unique Number Example: P2661A-P103A, where P2661A indicates Job No. P2-66-1A and P103A is the conduit ID. The same Job No. shall be used for all conduits installed by the project. Some projects do not have a Job Number and this portion of the conduit number is deleted.

The hyphen shall be followed by the Conduit ID per the Contract Conduit Schedule.

3. Conductor Service shall be defined as follows:

P - for power and control between 51 and 500 volts
C - for control with a hot + neutral but no other power conductors F - for fiber optics
S - for intrinsic safe, signal, fire alarm, security, P.A.; all other voltages 50 volts and less.

X - for spares block number shall be a unique number for the conduit assigned by Contract or by the Contractor
A indicates a modifier usually used to differentiate between different segments of the conduit route.

4. Contractor shall provide a written request to Engineer for additional Conduit IDs as required where Conduit ID is not shown on Drawings and/or additional conduits are added to the Contract (other than lighting and receptacles).

15.b
Packet Pg. 845 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL IDENIFICATION NAMEPLATES
CHLORINE CONVERSION PROJECT 16075- 5

5. Conduit and tray marker tags shall be 2-inch minimum diameter, 0.036- inch minimum thickness, Type 316 stainless steel, with a single hole. Tags shall be attached to the conduits and tray segments with 0.03-inch Type 316 stainless steel wire. The conduit numbers and tray segment numbers shall be engraved or laser-etched in 3/16-inch minimum height characters.

The size of the characters shall increase by 1/16 inch for every foot of installed elevation above 5 feet. E.g., for a tag installed at a 6-foot elevation, the character size shall be 3/16 inch + 1/16 inch = 1/4 inch.

6. All exposed conduits with conductors rated 480 V and above shall also be identified with markers in accordance with Section 16130, Raceway Systems and Pull Boxes.

B. Conductor and Multiconductor Cable Tags

1. Each conductor and multiconductor cable shall be identified with tags at each termination. The tag number shall be the same at each end. In addition, conductors and multiconductor cable shall be tagged at least once in pull boxes, junction boxes, manholes, maintenance holes, handholes.

2. Multiconductor cables shall be tagged at all jacket end points.

3. Multiconductor cables and conductors shall be tagged within 12 inches of entering a conduit from a cable tray and at all cable tray intersections and transitions.

4. Each conductor of a multiconductor cable shall be individually tagged.

5. Each multiconductor cable and conductor shall be identified with a white shrink-on wire marker sleeve acceptable to the Engineer. The wire sleeve should only be slightly shrunk to keep the tubing from slipping down the cable/conductor but loose enough to allow the wire tag to be rotated after it is installed so it can be made more readable. The sleeves shall be as manufactured by Brady, Thomas and Betts, or equal.

6. Tags relying on adhesives or taped-on markers shall not be acceptable.

7. Where shrink-on wire markers are not easily installed on cables in trays (such as in the middle of a very long run), Type 316 stainless steel laser etched metal tags shall be used for outdoor installations and machine printed durable tags by HellermannTyton (TipTag), Brady, or equal for indoor installations. Provide two-hole tags. Attach tags loosely to the cable using both holes with UV-resistant cable ties.

C. Color Coding: Power conductors shall be color coded at the terminations in accordance with Section 16120, Conductors and Cables. In addition, single power conductors of a three-phase circuit shall be color coded or tagged Phase A, B, and C at each manhole, handhole, and pull-box.

PART 3 EXECUTION

15.b
Packet Pg. 846 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL IDENIFICATION NAMEPLATES
CHLORINE CONVERSION PROJECT 16075- 6

3.01 GENERAL
A. The Contractor shall coordinate the installation of electrical equipment so all equipment, conduits, cable trays, cables, and conductors are identified in accordance with these Specifications.

B. Conduit and cable schedules in electronic format are available from the Engineer to aid in the creating of electrical ID.

END OF SECTION

15.b
Packet Pg. 847 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL TESTING
CHLORINE CONVERSION PROJECT 16080- 1
SECTION 16080

ELECTRICAL TESTING
PART 1 GENERAL

1.01 THE REQUIREMENT
A. This Section defines electrical equipment testing responsibilities for the Contractor.

B. The Contractor shall provide an independent, third-party International Electrical Testing Association (NETA) testing organization to perform electrical testing described herein based on the 2008 Edition of the International Electrical Testing Association Standard for Acceptance Testing Specifications for Electrical Power Distribution Equipment and Systems.

C. Certain tests specified herein that do not require the use of the testing organization may be performed by the Contractor.

D. The Contractor shall furnish all tools, equipment, material, and supplies and perform all labor required to perform electrical tests as indicated on the Contact Documents and specified herein.

E. The Contractor shall include electrical testing in the construction schedule.

1.02 RELATED WORK SPECIFIED ELSEWHERE
A. The requirements of the following sections and divisions apply to the Work of this Section. Other sections and divisions, not referenced below, shall also apply to the extent required for proper performance of this Work.

1. Division 16, Electrical, applicable sections

2. Division 17, Instrumentation and Control, applicable sections

1.03 REFERENCE SPECIFICATIONS, CODES AND STANDARDS
A. All Work specified herein shall conform to or exceed the applicable requirements of the referenced portions of the following publications to the extent that the provisions thereof are not in conflict with other provisions of these Specifications.

B. Comply with the applicable editions of the following codes, regulations, and standards:

1. Codes and Standards
29 CFR 1910 Code of Federal Regulations, Title 29, Part 1910, U.S.

Occupational Safety and Health Standards (OSHA)
CCR California Code of Regulations Title 24 Part 3 California Electrical Code (CEC)

15.b
Packet Pg. 848 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL TESTING
CHLORINE CONVERSION PROJECT 16080- 2
CCR California Code of Regulations, Title 8, Div. 1, Chap. 4, Subchapter 5, Electrical Safety Orders
NFPA 70 National Electrical Code (NEC)
NFPA 70E Standard for Electrical Safety In the Workplace

2. Industry Standards
IEEE 43 Recommended Practice for Testing Insulation
Resistance of Rotating Machinery
NETA Standard for Certification of Electrical Testing
Technicians
NETA Standard for Acceptance Testing Specifications

3. Other Standards
ANSI American National Standards Institute
IEEE Institute of Electrical and Electronics Engineers
NEMA National Electrical Manufacturers Association
NETA InterNational Electrical Testing Association
NFPA National Fire Protection Association
NIST National Institute of Standards and Technology
C. Comply with the applicable reference Specifications as directed in the General Requirements and Additional General Requirements.

1.04 SUBMITTALS
A. Submittals shall be made in accordance with the General Requirements, Additional General Requirements and as specified herein.

B. Testing Organization Qualifications: The Contractor shall submit for ENGINEER’s acceptance the qualifications of the testing organization and testing personnel to demonstrate that they comply with the requirements as described above.

C. Testing Plan

1. The Contractor shall submit for ENGINEER’s acceptance a testing plan for each electrical item. Equipment tested by the testing organization and equipment tested by the CONTRACTOR’s testing personnel shall be included in Testing Plan.

2. The testing plan shall detail the type, schedule and duration of each test.

The testing plan shall, as a minimum, include a description of test, identify

15.b
Packet Pg. 849 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL TESTING
CHLORINE CONVERSION PROJECT 16080- 3
tools required, construction power required, the state of installation of the equipment to be tested, and any safety issues.

D. Test Reports: Three bound copies of the certified test reports shall be submitted to the Engineer at the completion each test. The final report shall be signed and shall include the following information:

1. Summary of the project

2. Description of equipment tested and OWNER Tag Number

3. Visual inspection report

4. Description of tests

5. Test results

6. Conclusions and recommendations

7. Appendix including appropriate test forms

8. Identification of test equipment used

9. Device setting values

10. Tester’s name and date of test

1.05 QUALITY ASSURANCE
A. General: Comply with the requirements specified herein and the applicable reference Specifications of the General Requirements and Additional General Requirements.

B. Test Instrumentation

1. The testing organization and Contractor shall have a calibration program that ensures that all applicable test instruments are maintained within rated accuracy. The accuracy shall be directly traceable to NIST Standards.

Dated calibration labels shall be visible on all test equipment, and up to date records and calibration instructions shall be maintained for each test instrument. The calibrating standard shall be of a higher accuracy than that of the instrument tested.

2. All testing shall be done using the proper test equipment. Megohmmeters, ohmmeters, and dc high-potential test sets from such manufacturers as Biddle, Associated Research, Hipotronics, and AEMC shall be acceptable for use in performing insulation resistance and high-potential tests.

C. Testing Organization

1. The testing organization shall be an independent, third party entity which shall function as an unbiased testing authority, professionally independent

15.b
Packet Pg. 850 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL TESTING
CHLORINE CONVERSION PROJECT 16080- 4
of the manufacturers, suppliers, and installers of equipment or systems being evaluated.

2. The testing organization shall be regularly engaged in testing of electrical equipment devices, installations, and systems.

3. The testing organization shall use technicians who are NETA-certified and regularly employed for testing services.

4. The testing organization shall be a current NETA-accredited company.

5. Technicians performing electrical tests and inspections shall be trained and experienced concerning the apparatus and systems being evaluated.

6. Technicians shall be certified in accordance with NETA Standard for Certification of Electrical Testing Technicians. Each on-site crew leader shall hold a current certification, Level III or higher in electrical testing.

PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION

3.01 EXECUTION - GENERAL
A. Prior to testing equipment including cable, the equipment shall be installed and secured per the manufacturer’s recommendations, the Contract Documents. A minimum of ten days in advance, the Contractor shall provide a notice to the Engineer for inspection of installation. ENGINEER's acceptance of installation shall be obtained prior to the commencement of any testing.

B. The Contractor shall update the testing schedule showing daily work projected a minimum of three weeks into the future.

C. The Contractor shall provide a minimum of seven days notice to the Engineer for the scheduling of any testing.

D. The Contractor shall provide the testing organization-approved manufacturers’ documentation of all equipment.

E. The Contractor, in the event a retest is required due to failure of equipment, adverse testing conditions, or method of installation, shall schedule the retest. Any impact to schedule shall be borne by the Contractor.

F. All tests that are required to be performed, whether done by the Contractor or by the testing organization shall be in accordance with NETA Standard for Acceptance Testing Specifications.

G. High-potential tests shall not be repeated without authorization by the Engineer.

H. Test and inspection records shall be submitted to the Engineer no later than thirty days after completion of the individual test and prior to energizing of equipment.

15.b
Packet Pg. 851 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL TESTING
CHLORINE CONVERSION PROJECT 16080- 5
I. All tests shall be performed with the equipment or material de-energized, except where otherwise specifically required by the nature of the test.

J. All items not in conformance with the requirements of this Section shall be noted on an Electrical Punchlist Record for correction by the Contractor.

K. The Engineer may, during start-up and check-out of electrical equipment, perform additional testing functions, wiring check-out, operational compliance certification, etc. to satisfy that the equipment meets the Contract requirements. The Contractor shall be responsible for correcting deficiencies revealed by the testing.

3.02 TESTS NOT REQUIRED TO BE PERFORMED BY THE TESTING ORGANIZATION

AND ELIGIBLE FOR CONTRACTOR TESTING
A. Tests listed herein are to be performed either by the testing organization or the Contractor’s staff. The tests are not substitutions for tests required to be performed by the testing organization but are additional or complimentary tests.

B. Upon completion of various phases of the project, electrical equipment and wiring and cabling systems shall be inspected and tested in accordance with this Section.

All testing shall be in accordance with the applicable ANSI, IEEE, NETA, NEMA, or other national standard, and in accordance with the specific manufacturer's instruction bulletins or other literature supplied with the equipment to be tested, and the test equipment manufacturer's operating instructions.

C. The Contractor shall check all equipment for proper mechanical adjustment and freedom of operation. All electrical equipment, both pre-wired and field-wired shall be field-tested for functional operation, including all intended modes and sequences of operation. This shall include switches, relays, non-adjustable circuit breakers, contactors, etc., including control interlock and sequence circuits. All necessary adjustments shall be made on apparatus in accordance with the manufacturer's instructions and design requirements. Alarm systems and circuits shall be tested by manually operating the initiating devices. Relays and control components that may prove to be functioning incorrectly or otherwise appear to be unreliable shall be repaired or replaced as necessary. An electrical system will not be accepted until it is tested in its entirety and the results reported to and accepted by the Engineer.

D. Circuit and Cable Testing

1. Power, Control and Lighting Circuits - 600 V and Below. The Contractor shall perform continuity checks of all power, control and lighting cables and wires, including each conductor of multiconductor and multipair cables.

Continuity checks shall be done prior to termination of cables and any testing organization tests.
a. The Contractor shall visually check all wire and cable connections, verify wire numbers, and verify that the actual wiring conforms to the Drawings.
b. Each power cable shall be tested to ensure proper phase identification.

15.b
Packet Pg. 852 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL TESTING
CHLORINE CONVERSION PROJECT 16080- 6
c. The conductor ends shall be cleaned and guarded for personnel safety during testing. Circuits in the immediate vicinity that are not under test shall be grounded.
d. Prior to performing insulation resistance tests on cables, the Contractor shall verify that they are not connected to any solid state devices, transformers, or capacitors.
e. The Contractor shall perform insulation resistance tests on all 600 V power and control cables. Each conductor in a multiconductor or multipair cable or conduit shall be tested against ground with the conduit and/or all others conductors connected to ground. Motor feeder circuits shall be tested with motors disconnected and the controller open. Motor control circuits shall be tested with control stations and overcurrent devices disconnected. Lighting panelboard main feeder circuits, including lighting panelboard and transformer, shall be tested with the branch circuit breakers open.

Testing shall be for one minute using 1000 V dc. Values of insulation resistance less than 50 megohms shall not be acceptable.
f. The Contractor shall check all ac and dc control circuits for short circuits and extraneous grounds.
g. The Contractor shall perform functional tests of all power, control and lighting circuits. Alarm conditions shall be simulated for each alarm and control point, and alarm indicators shall be checked for proper operation. All control circuits shall function as intended by the Contract Documents. Metering and indication lights for motors shall be checked for proper operation. All lighting panels, circuits and fixtures, power panels, circuits, and receptacles shall be tested for proper operation.
h. The Engineer shall be notified if minimum insulation resistance values are not obtained.

2. Instrumentation, Signal and Alarm Circuits - 300 V and Below a. The Contractor shall perform continuity checks of all instrumentation, signal and alarm cables and wires, including each conductor of multiconductor and multipair cables. Continuity checks shall be done prior to termination of cables.
b. The Contractor shall visually check all wire and cable connections, verify wire numbers, and verify that actual wiring conforms to the Drawings.
c. Prior to performing insulation resistance tests on cables, verify that they are not connected to any solid-state devices.
d. The Contractor shall perform insulation resistance tests on all instrumentation, signaling and alarm cables. Each conductor in a multiconductor or multipair cable or conduit shall be tested against ground with the conduit, shield and/or all other conductors connected to ground. Testing shall be for one minute using 500 V

15.b
Packet Pg. 853 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL TESTING
CHLORINE CONVERSION PROJECT 16080- 7
dc. Values of insulation resistance less than 50 megohms shall not be acceptable.
e. Alarm conditions shall be simulated for each alarm and control point, and alarm indicators checked for proper operation. f. The Contractor shall check all ac and dc instrumentation, signaling and alarm circuits for short circuits and extraneous grounds. g. The Engineer shall be notified if minimum insulation resistance values are not obtained.
h. The Contractor shall perform a functional test of all electrical signaling and alarm systems.

E. Low-Voltage Motor Testing

1. Motor Tests Prior to Energization
a. The following tests shall be conducted prior to starting motors for all motors 3 horsepower and larger but smaller than 20 horsepower:
(1) Compare equipment nameplate with the Contract
Documents.
(2) Inspect physical and mechanical condition.
(3) Inspect anchorage, alignment, and grounding.
(4) Perform insulation resistance tests in accordance with IEEE 43 of all motor windings before connecting power cables to motors. Test duration shall be one minute. Insulation
resistance shall be a minimum of 50 megohms at 20
degrees C at test voltage of 1000 V dc.
(5) Inspect bolted electrical connections for high-resistance using the calibrated torque-wrench method in accordance with manufacturer’s published data.
(6) Check all bearings to see if they are properly filled with oil or grease.
(7) Check coupling alignment and shaft end play.
(8) Rotate the motor shaft by hand or bar to ensure it is free to rotate.

3.03 TESTS REQUIRED TO BE PERFORMED BY TESTING ORGANIZATION A. The tests of this Section shall be performed by an independent third-party testing organization to perform the work and hired by and under the direction of the Contractor.

B. Prior to testing equipment including cable, the equipment shall be installed and secured per the manufacturer’s recommendations and the Contract Documents.

All terminations required for NETA testing shall be complete. A minimum of ten days in advance, the Contractor shall provide a notice to the Engineer for inspection of installation. ENGINEER’s acceptance of installation shall be

15.b
Packet Pg. 854 Attachment: Bid Set - Technical Specifications Volume II of II (5219 : Approval of Plans & Specs - WTP Chlorine Conversion)

CITY OF EL CENTRO ELECTRICAL TESTING
CHLORINE CONVERSION PROJECT 16080- 8
obtained prior to the commencement of any testing.

C. Subsequent to acceptance of installation by the Engineer, the Contractor shall provide a minimum of ten days notice of third party testing. Energizing of tested equipment is at the discretion of the Engineer and will not take place until passed and documented by the testing organization and reviewed by the Engineer. The entire electrical system shall be tested before energization. If functional testing requires power, the Contractor shall provide temporary power for that purpose. All testing shall be completed prior to equipment start up.

D. All references to NETA in this Section are referring to NETA Standard for Acceptance Testing Specifications.

E. The following tests shall be performed by the testing organization and witnessed by the Engineer:

1. Circuit Breakers, Air, Low-Voltage Power: Perform all inspection and tests, including all optional tests, listed in Section 7.6.1.2 of NETA on all lowvoltage power circuit breakers.

2. Grounding Systems: Perform all inspection and tests listed in Section 7.13 of NETA on grounding system.

3.04 SETTING and testing OF ADJUSTABLE/PROGRAMMABLE PROTECTIVE DEVICES A. The Engineer will provide settings within thirty days after CONTRACTOR’s “Protective Device Setpoint and Arc Flash Request” and all protective device data/manual submittal.

B. The testing organization shall set/program and test the adjustable/programmable protective devices in the field according to applicable NETA and manufacturer’s requirements.

C. Contractor shall provide all software and hardware required to set or program devices.