AGENDA

CITY OF EL CENTRO

CITY COUNCIL
TUESDAY, NOVEMBER 7, 2023
City Hall Regular Meeting 11:30 AM

CITY HALL

COUNCIL CHAMBERS
1275 MAIN STREET
EL CENTRO, CA 92243
City of El Centro Page 1
The public may attend in person. Any member of the public attending in person and wishing to make a comment is asked to complete a speaker slip and follow the instructions below regarding “Notice to the Public”. Any member of the public is invited to submit public comments in advance of the meeting to be answered at the meeting. Please email your questions to [email protected] or call 760-337-4515 by November 7, 2023.

COUNCIL MEMBERS, STAFF AND THE PUBLIC MAY ATTEND VIA ZOOM.

To participate and make a public comment in person, via Zoom or telephone, please raise your hand, speak up and introduce yourself.

Join Zoom Meeting:
https://us06web.zoom.us/j/4180375132?pwd=Rmo5UjZ1cWdyV1VoWUhSZWp6R0tVZz09 Optional dial-in number: 1 (669) 900-6833
Meeting ID: 418 037 5132 Passcode: 5iHJYM
Public comments via zoom are subject to the same time limits as those in person.

Mayor & Council Members may be reached at (760) 336-8989 Mayor: Martha Cardenas-Singh City Manager: Cedric Ceseña Mayor Pro-Tem: Sylvia Marroquin City Attorney: Elizabeth Martyn Evans Council Members: Edgard Garcia City Clerk: Norma Wyles
Tomás Oliva
Sonia Carter
11:30 A.M CLOSED SESSION - CONFERENCE ROOM "A"
ROLL CALL (Open Session)
CLOSED SESSION PUBLIC COMMENT:

Any member of the public wishing to address the City Council on any matter appearing on the closed session may do so at this time. Unless the Mayor extends the time limit, remarks shall be limited to three (3) minutes. Additional opportunities for Public Comments will be given during and at the end of the meeting.

Agenda City Council of the City of El Centro November 7, 2023 City of El Centro Page 2

CITY COUNCIL ADJOURNS INTO CLOSED SESSION

CITY COUNCIL CLOSED SESSION

ANTICIPATED LITIGATION
A point has been reached where, in the opinion of the City Council upon the advice of its legal counsel, and based upon existing facts and circumstances, there is a significant possibility of initiation of litigation by the City pursuant to Govt. Code Section 54956.9(d)(4): one case

POSSIBLE LITIGATION
A point has been reached where, in the opinion of the City Council upon the advice of its legal counsel, and based upon existing facts and circumstances, there is a significant possibility that there will be litigation initiated against the City under Govt. Code Section 54956.9(d)(2).

EXISTING LITIGATION
A point has been reached where, in the opinion of the City Council upon the advice of its legal counsel, and based upon existing facts and circumstances, there is a need to discuss existing litigation to which the City is a party: City of El Centro v. LAFCO.

NOTICE TO THE PUBLIC
This is a public meeting. If there is an item on the agenda on which you wish to be heard, you are asked to complete a blue speaker slip and submit it to the City Clerk prior to the start of the meeting. Persons wishing to address the Council are not required to identify themselves (Gov’t Code § 54953.3); however, this information assists the Mayor by ensuring that all persons wishing to address the Council are recognized and also assists the City Clerk in preparing the City Council meeting minutes. When the item is announced and your name is called by the Mayor, please step to the podium and state your name for the record. Unless the Mayor extends the time, there is a three (3) minute time limit for each public presentation. If you wish to address the Council concerning any other matter not appearing on the agenda, you may do so during the public comment portion of the agenda. However, you may not show a visual presentation without review of that material. If you do so, you will be considered out of order. * Any information provided on the “Speaker Slip” is voluntary and will be public record.

RECONVENE FOR OPEN SESSION 6:00 P.M.
6:00 P.M. OPEN SESSION

ALL TIMES ARE APPROXIMATE AND MAY VARY
Agenda City Council of the City of El Centro November 7, 2023 City of El Centro Page 3
CALL TO ORDER:

ROLL CALL BY CITY CLERK
PLEDGE OF ALLEGIANCE:

INVOCATION:
6:05-6:10 CITY ATTORNEY REPORT ON CLOSED SESSION:
6:10-6:15 (TIME MAY VARY) PUBLIC COMMENTS:

The City Council welcomes your input. At this time, members of the public may address the City Council on any matter not listed on the posted agenda. Pursuant to the Brown Act, no action will be taken on any issue brought forth under Public Comments. We ask that you please complete a “Speaker Slip” and submit it to the City Clerk prior to the start of the meeting. Although you are not required to identify yourself (Gov’t Code §54953.3); this information on the “Speaker Slip” assists the Mayor that all persons wishing to address the Council are recognized and also assists the City Clerk in preparing the City Council meeting minutes. Unless the Mayor extends the time, there is a three (3) minute time limit for each public presentation. * Any information provided on the “Speaker Slip” is voluntary and will be public record. 6:15-6:20 PRESENTATIONS AND ANNOUNCEMENTS BY MAYOR:

1. Certificate of Recognition - Paul Maxwell, California Paramedic Foundation 6:20-6:25 CONSENT AGENDA: (ITEMS 2-6)

2. Approval of City Council Minutes of October 2, 2023 (Special Meeting) and October 3, 2023.

3. Adopt Resolution No. 23- , RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF EL CENTRO ACCEPTING GRANT FUNDS ALLOCATED TO

THE CITIZENS OPTION FOR PUBLIC SAFETY PROGRAM FUNDED FOR FY 2021-2022 THROUGH THE STATE OF CALIFORNIA LOCAL SAFETY

AND PROTECTION ACCOUNT

4. Approve Plans and Specifications for the East Main Evan Hewes Highway Rehabilitation Project CRASL 5169 (057) and authorize staff to release for public bidding.

5. Approval of Bid Documents for the CDBG Commercial Facade Improvement Program and Authorize the Community Services Department to Send out to Bid

6. Approve Resolution 23- , RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF EL CENTRO AUTHORIZING THE SUBMITTAL OF ALL

INDIVIDUAL GRANT APPLICATIONS FOR ALL GRANT PROGRAMS FOR WHICH THE CITY OF EL CENTRO IS ELIGIBLE.

Agenda City Council of the City of El Centro November 7, 2023 City of El Centro Page 4
6:25-6:50 PUBLIC HEARINGS:

7. Public hearing to consider the recommendation of the Planning Commission regarding the Vasquez Apartments Negative Declaration No. 22-04 PRESENTATION: Angel Hernandez, Community Development Director RECOMMENDATION:

Adopt Resolution No. 23- , A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL CENTRO ADOPTING NEGATIVE DECLARATION 22-04 (SCH# 2023-060637) FOR PROJECT: Change of Zone 22-05, and General Plan Amendment 22-05, a proposed zone change from R1 (Single-Family Residential) to R3 (Multiple Family Residential), and General Plan Amendment for consistency with the Zoning Map, located at 1274 West Pico Avenue, further identified by APN 044-261-010

8. Public hearing to consider the recommendation of the Planning Commission regarding Vasquez Apartments Zone Change No. 22-05
PRESENTATION: Angel Hernandez, Community Development Director RECOMMENDATION:

Introduce Ordinance No. 23- , AN ORDINANCE OF THE CITY COUNCIL OF

THE CITY OF EL CENTRO AMENDING THE ZONING MAP FOR THE CITY OF EL CENTRO PERTAINING TO CHANGE OF ZONE NO. 22-05, waive reading and approve as first reading and authorize City Clerk to place on the next agenda for second reading and adoption.

9. Public hearing to consider the recommendation of the Planning Commission regarding the Vasquez Apartments General Plan Amendment No. 22-05 PRESENTATION: Angel Hernandez, Community Development Director RECOMMENDATION:

Adopt Resolution No. 23- , RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL CENTRO APPROVING GENERAL PLAN AMENDMENT NO. 22-05

CHANGING THE LAND USE DESIGNATION FROM LOW DENSITY

RESIDENTIAL TO HIGH-MEDIUM RESIDENTIAL FOR PROPERTY WITH APN 044-261-010 AND LOCATED AT 1274 PICO AVENUE, AND DECLARING SAME

TO BE THE FIRST GENERAL PLAN AMENDMENT FOR CALENDAR YEAR 2023.

Agenda City Council of the City of El Centro November 7, 2023 City of El Centro Page 5

10. Zoning Ordinance Text Amendment 23-01 - Allowing Cardrooms in the CGGeneral Commercial Zone PRESENTATION: Angel Hernandez, Director of Community Development RECOMMENDATION:

Cancel public hearing regarding Zoning Ordinance Text Amendment 23-01 - Allowing Cardrooms in the CG-General Commercial Zone
6:50-7:40 NEW BUSINESS:

11. City Manager's New Staffing Recommendation
PRESENTATION: Dulce Bedolla, Human Resource Director
RECOMMENDATION:

Approve the creation of the Multimedia Content Creator position as described in job description

12. Award Police Station Construction Project
PRESENTATION: Abraham Campos, PE - Public Works Director/City Engineer RECOMMENDATION:

1. Approve FY24 budget amendment as presented in Exhibit A

2. Approve Resolution No. 23- , RESOLUTION OF THE CITY COUNCIL OF

THE CITY OF EL CENTRO AWARDING THE BID AND AUTHORIZING THE

EXECUTION OF A CONTRACT FOR THE CONSTRUCTION OF THE CITY OF

EL CENTRO POLICE STATION

3. Approve Project Budget as presented in this report

13. Purchase of a Service Truck for Street Maintenance Division PRESENTATION: Abraham Campos, PE - Public Works Director/City Engineer RECOMMENDATION:

1. Appropriate additional funding as presented

2. Adopt Resolution No. 23- , RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF EL CENTRO APPROVING AND AUTHORIZING THE PURCHASE OF A

SERVICE TRUCK FOR STREET MAINTENANCE DIVISION
Agenda City Council of the City of El Centro November 7, 2023 City of El Centro Page 6

14. Letter of Support - Community Food Projects Grant Program Planning, San Diego State University
PRESENTATION: Cedric Cesena, City Manager
RECOMMENDATION:

Ratify letter of support requested by San Diego State University for Community Food Projects Competitive Grant Program Planning Project.

15. Discussion and Necessary Action Regarding the Award of Bid and Authorizing the Execution of a Contract for the Swarthout Park Field Lighting Project PRESENTATION: Adriana Nava, Community Services Director RECOMMENDATION:

Adopt Resolution No. 23- , RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF EL CENTRO AWARDING THE BID AND AUTHORIZING THE

EXECUTION OF A CONTRACT FOR THE SWARTHOUT PARK FIELD LIGHTING

PROJECT

16. Approval of Resolution Authorizing the City to Receive State Funding PRESENTATION: Abraham Campos, PE - Public Works Director/City Engineer RECOMMENDATION:

Adopt Resolution No. 23- , RESOLUTION OF THE CITY COUNCIL OF THE

CITY OF EL CENTRO AUTHORIZING THE EXECUTION OF AN AGREEMENT

WITH THE CALIFORNIA DEPARTMENT OF TRANSPORTATION FOR THE

EMBELLECE (BEAUTIFY) EL CENTRO PROJECT
LEGISLATIVE ACTION:

INFORMATIONAL ITEMS:

17. Received and referred to Community Development Department, Application for Alcoholic Beverage License El Guerro Tacos & Beer 1560 Ocotillo Dr. STE K El Centro, CA 92243-4237

18. Received and referred to Community Development Department, Application for Alcoholic Beverage License La Birrieria Red Tacos # 2 El Centro, CA 92243
Agenda City Council of the City of El Centro November 7, 2023 City of El Centro Page 7
7:40-8:20 TASK FORCE REPORTS AND MAYOR - COUNCIL MEMBER

REPORTS
8:20-8:30 CITY MANAGER REPORT:

ADJOURNMENT
Materials related to an item on this Agenda submitted to the City Council after distribution of the agenda packet will be available for public inspection at the Office of the City Clerk, 1275 Main Street, El Centro, California 92243, Monday-Friday during normal business hours.

In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, you should contact the office of the City Clerk at (760)337-4515. Notification at least 48 hours prior to the meeting will enable the City to make reasonable arrangement to assure accessibility to this meeting.

City Council of the City of El Centro Meeting: 11/07/23 11:30 AM 1275 Main Street Department: City Council
El Centro, CA 92243 Category: Recognition
Prepared By: Cynthia De Zilwa
SCHEDULED Department Head: Martha Cardenas-Singh
PRESENTATION (ID # 6183) DOC ID: 6183
Certificate of Recognition - Paul Maxwell, California
Paramedic Foundation
1 Packet Pg. 8
City Council of the City of El Centro Meeting: 11/07/23 11:30 AM 1275 Main Street Department: City Clerk's Office
El Centro, CA 92243 Category: Minutes
Prepared By: Norma Wyles
SCHEDULED Department Head: Norma Wyles
ACTION ITEM (ID # 6188) DOC ID: 6188
Approval of City Council Minutes of October 2, 2023 (Special Meeting) and October 3, 2023.

CITY MANAGER’S RECOMMENDATION:

Approval of City Council Minutes of October 2, 2023 (Special Meeting) and October 3, 2023.

ATTACHMENTS:
• 10-02-2023 Special Meeting CC Minutes (DOCX)
• 10-03-2023 Regular CC Minutes (DOCX)
2 Packet Pg. 9
Book 37

Page 138 ends

SPECIAL MEETING

EL CENTRO CITY COUNCIL

CITY HALL, CONFERENCE ROOM A
1275 MAIN STREET, EL CENTRO, CA
MONDAY, OCTOBER 2, 2023, 5:30 P.M.

OPEN SESSION
The El Centro City Council met in a special meeting on Monday, October 2, 2023 at 5:30 p.m. in Conference Room A, El Centro City Hall, 1275 Main Street, El Centro, California.

PRESENT: Council: Carter, Oliva, Cardenas-Singh, Marroquin, Garcia City Clerk Wyles, City Manager Ceseña, City Attorney Martyn Evans MOTION TO GO INTO CLOSED SESSION:

Moved by Oliva, second by Carter to go into closed session at 5:32 p.m.

CLOSED SESSION PUBLIC COMMENT:

No comments were received.

ANTICIPATED LITIGATION
A point has been reached where, in the opinion of the City Council upon the advice of its legal counsel, and based upon existing facts and circumstances, there is a significant possibility of initiation of litigation against the City under Govt. Code Section 54956(d)(2).

POSSIBLE LITIGATION BY THE CITY
A point has been reached where, in the opinion of the City Council upon the advise of its legal counsel, and based upon existing facts and circumstances, there is significant possibility that the City will initiate litigation against pursuant to Govt. Code Section 54956.9(d)(4).

CITY ATTORNEY REPORT ON CLOSED SESSION
No reportable action.

ADJOURNMENT
With no further business to come before City Council, Mayor Cardenas-Singh adjourned the meeting 8:00 p.m. ____________________________
Norma Wyles, City Clerk
APPROVED BY:
_________________________
Martha Cardenas-Singh, Mayor

2.a
Packet Pg. 10
Attachment: 10-02-2023 Special Meeting CC Minutes (6188 : Approval of City Council Minutes) Book 37

Page 139 ends

REGULAR MEETING

EL CENTRO CITY COUNCIL

CITY HALL, COUNCIL CHAMBERS
1275 MAIN STREET, EL CENTRO, CA
TUESDAY, OCTOBER 03, 2023 11:30 A.M.

The El Centro City Council met in a regular session on Tuesday, October 3, 2023 at 11:34 a.m. in Conference Room “A”, El Centro City Hall, 1275 Main Street, El Centro, California for the purpose of closed session.

PRESENT: Council: Carter, Cardenas-Singh, Marroquin, Garcia City Clerk Wyles, City Manager Ceseña, City Attorney Martyn Evans ABSENT: Council: Oliva, arrived at 11:35 a.m.

CLOSED SESSION PUBLIC COMMENT
None

CITY COUNCIL CLOSED SESSION
Moved by Carter, second by Marroquin, to adjourn into closed session for:

ANTICIPATED LITIGATION
A point has been reached where, in the opinion of the City Council upon the advice of its legal counsel, and based upon existing facts and circumstances, there is a significant possibility of initiation of litigation by the City litigation pursuant to Govt. Code Section 54956.9(d)(4).

POSSIBLE LITIGATION (Removed from Closed Session agenda – No addition was added) A point has been reached where, in the opinion of the City Council upon the advice of its legal counsel, and based upon existing facts and circumstances, there is a significant possibility that the City will initiate litigation under Govt Code Section 54956.9(d)(2) - one case. City of El Centro v. LAFCO.

LABOR NEGOTIATION:

The City Council will recess to closed session pursuant to Government Code Section 54957.6 for the following purposes of considering employee compensation in the form of fringe benefits, or, as applicable, other related matters within the scope of representation and giving instruction to the City's negotiators (the City Manager, the Human Resources Director and consultant Patrick Clark) for the following: Police Officers Association re-opener longevity clause, the Water Group pursuant to the total compensation study results.

Motion unanimously carried. (Council Member Oliva arrived at 11:35 a.m.) Closed Session concluded at 1:45 p.m.

City Council recessed to 6:00 p.m.

2.b
Packet Pg. 11
Attachment: 10-03-2023 Regular CC Minutes (6188 : Approval of City Council Minutes) Book 37

Page 140 ends

OPEN SESSION
The El Centro City Council met in a joint regular session on Tuesday, October 3, 2023 at 6:00 p.m. in Council Chambers, El Centro City Hall, 1275 Main Street, El Centro, California.

PRESENT: Council: Carter, Oliva, Cardenas-Singh, Marroquin, Garcia City Clerk Wyles, City Manager Ceseña, City Attorney Martyn Evans Pledge of Allegiance to the flag of the United States of America was led by Mayor Pro-Tem Marroquin and Invocation was given by Council Member Carter.

CITY ATTORNEY REPORT ON CLOSED SESSION
During the closed session, City Council discussed confidential litigation matters as well as gave direction to its collective bargaining representatives.

Our Mayor stated that the City Manager, Cedric Cesena was joining the meeting on Zoom.

PUBLIC COMMENTS
Public comment was received by Michelle Hollinger, invitation to the Victoria Homes Grand Opening on October 12, 2023.

PRESENTATIONS AND ANNOUNCEMENTS BY MAYOR:

1. Proclamation for Domestic Violence Awareness Month October 2023 received by Gina Vargas, WomanHaven, Executive Director.

2. Proclamation for National Fire Prevention Week received by Fire Chief Joseph Bernal.

3. Proclamation for National Community Planning Month received by Angel Hernandez, Community Development Director.

4. Proclamation for Code Enforcement Office Appreciation Week received by Angel Hernandez, Community Development Director and Frank Soto, Community Development Asst. Director.

SCHEDULED PUBLIC COMMENTS

5. Quarterly Report by IV Regional Chamber of Commerce by President Sherie Cowie.

CONSENT AGENDA
Moved by Garcia, second by Oliva, approving consent items # 6-7.

6. Approval City Council Minutes for August 15, 2023, August 25, 2023 (Special Meeting), September 12, 2023 and September 19, 2023.

7. Approved the execution of contract change order 5 in the amount of $334,506.00 and approve a revised budget for the Dogwood Road Improvements at Wake Ave. & Danenberg Dr. project.

AYES: Carter, Oliva, Cardenas-Singh, Marroquin, Garcia
NOES: None
ABSENT: None
ABSTAINED:None

2.b
Packet Pg. 12
Attachment: 10-03-2023 Regular CC Minutes (6188 : Approval of City Council Minutes) Book 37

Page 141 ends

NEW BUSINESS
Item #9 was moved up by Mayor Cardenas-Singh.
*9. Moved by Garcia, second by Carter, approval of community sponsorship of $750.00 to WomanHaven, A Center for Family Solutions.

AYES: Carter, Oliva, Cardenas-Singh, Marroquin, Garcia
NOES: None
ABSENT: None
ABSTAINED:None

8. Moved by Garcia, second by Carter, approval of community sponsorship of $1,000.00 to MANA de Imperial Valley.

AYES: Carter, Oliva, Marroquin, Garcia
NOES: None
ABSENT: None
ABSTAINED: Cardenas-Singh

10. Moved by Oliva, second by Garcia, approval of the reclassification of the Chief Mechanic position to grade G13.

AYES: Carter, Oliva, Cardenas-Singh, Marroquin, Garcia
NOES: None
ABSENT: None
ABSTAINED:None

11. Moved by Carter, second by Marroquin, approval of Ordinance No. 23-05, ORDINANCE OF THE

CITY COUNCIL OF THE CITY OF EL CENTRO AUTHORIZING AN AMENDMENT TO THE

CONTRACT BETWEEN THE CITY COUNCIL OF THE CITY AND THE BOARD OF ADMINISTRATION OF THE CALIFORNIA PUBLIC EMPLOYEES’ RETIREMENT SYSTEM, waive reading and approve as a first reading and authorize City Clerk to place on the agenda for second reading and adoption.

AYES: Carter, Oliva, Cardenas-Singh, Marroquin, Garcia
NOES: None
ABSENT: None
ABSTAINED:None

12. Presentation by Abraham Campos, PE, Public Works Director, City Engineer, approval of Agreement for Acquisition of Real Property located at 363 Brighton Avenue.

Motion by Cardenas-Singh, second by Garcia, 1) approval of the purchase in the amount of $75,000 and allow a $5,000 contingency for the documentation and escrow purposes and 2) adoption of Resolution No. 23-92, RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL CENTRO

APPROVING AN AGREEMENT FOR THE PURCHASE OF REAL PROPERTY WITH NORMA VILLICANA AND NORMA M. VILLICANA.

2.b
Packet Pg. 13
Attachment: 10-03-2023 Regular CC Minutes (6188 : Approval of City Council Minutes) Book 37

Page 142 ends

AYES: Carter, Oliva, Cardenas-Singh, Marroquin, Garcia
NOES: None
ABSENT: None
ABSTAINED:None

13. Presentation by Abraham Campos, PE, Public Works Director, City Engineer, approval of Agreement for Acquisition of Real Property located at 317 Brighton Avenue.

Motion by Garcia, second by Oliva, 1) approval of the purchase in the amount of $75,000 and allow a $5,000 contingency for the documentation and escrow purposes and 2) adoption of Resolution No. 23-93, RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

EL CENTRO APPROVING AN AGREEMENT FOR THE PURCHASE OF REAL PROPERTY WITH NORMA VILLICANA AND NORMA M. VILLICANA.

AYES: Carter, Oliva, Cardenas-Singh, Marroquin, Garcia
NOES: None
ABSENT: None
ABSTAINED:None

14. Moved by Oliva, second by Garcia, approval of a revised project budget for the 2023 Streets Overlay Project.

AYES: Carter, Oliva, Cardenas-Singh, Marroquin, Garcia
NOES: None
ABSENT: None
ABSTAINED:None

15. Presentation by Angel Hernandez, Director of Community Development, discussion regarding amending Chapter 4, Article III of the Code of Ordinances related to the regulation of Cardrooms. Speaker: James Carson, Mr. Hernandez is asking for staff direction on the proposed amendments to the regulation of cardrooms.

Mayor and Council members discussed the various options which can be drafted into the city ordinance.

Asking for direction for this item.

16. Moved by Garcia, second by Carter, appointments of Ashley Bertussi and Andy Alvarez to the Planning Commission Board to fill two scheduled vacancies with terms ending October 3, 2027.

AYES: Carter, Oliva, Cardenas-Singh, Marroquin, Garcia
NOES: None
ABSENT: None
ABSTAINED: None

17. Moved by Garcia, and second by Carter, appointment of voting delegate, Council Member Tomás Oliva and alternate, Mayor Pro-Tem Sylvia Marroquin, for the National League of Cities (NLC) Annual Business Meeting at the conclusion of the City Summit in Atlanta, Georgia on November 15- 18, 2023.

AYES: Carter, Oliva, Cardenas-Singh, Marroquin, Garcia
NOES: None
ABSENT: None
ABSTAINED: None

2.b
Packet Pg. 14
Attachment: 10-03-2023 Regular CC Minutes (6188 : Approval of City Council Minutes) Book 37

Page 143 ends

LEGISLATIVE ACTION - None
INFORMATIONAL ITEMS:

18. Imperial and Villa local emergency update.

TASK FORCE AND MAYOR & COUNCIL MEMBERS REPORTS
Mayor and Council Members reported on their activities since last City Council meeting and upcoming events.

CITY MANAGER REPORT
Reported on activities.

ADJOURNMENT
With no further business the meeting was adjourned at 7:41 p.m. __________________________
Norma Wyles, City Clerk
APPROVED BY:
________________________________
Martha Cardenas-Singh, Mayor

2.b
Packet Pg. 15
Attachment: 10-03-2023 Regular CC Minutes (6188 : Approval of City Council Minutes) City Council of the City of El Centro Meeting: 11/07/23 11:30 AM 1275 Main Street Department: Police
El Centro, CA 92243 Category: Resolution
Prepared By: Amanda Curiel
SCHEDULED Department Head: Robert Sawyer
RESOLUTION (ID # 6179) DOC ID: 6179
2021-2022 COPS Grant
CITY MANAGER’S RECOMMENDATION:

Adopt Resolution No. 23- , RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF EL CENTRO ACCEPTING GRANT FUNDS ALLOCATED TO THE CITIZENS OPTION FOR PUBLIC SAFETY PROGRAM FUNDED FOR FY 2021-2022 THROUGH

THE STATE OF CALIFORNIA LOCAL SAFETY AND PROTECTION ACCOUNT FISCAL IMPACT:
$173,756.19 (no matching funds)
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:

Goal#3: Community Health, Safety & Welfare
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE

DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTORS LICENSE, REFERENCE CHECKS, INSURANCE, ETC:

N/A
BACKGROUND:

El Centro Police Department would like to expend the funds on the following items:
$61,258.00 for the continued salary and benefits of one Community Service Officer; $900.00 for the Community Service Officer's uniform allowance; and $111,598.19 for the purchase of safety equipment.

DISCUSSION:

Funding from the Citizen's Option for Public Safety (COPS) Program will allow the El Centro Police Department to continue the employment of one Community Service Officer and the purchase of equipment above and beyond the amount available in our department budget.

CONCLUSION:

Adopt Resolution No. 23- , RESOLUTION OF THE CITY COUNCIL OF THE CITY

OF EL CENTRO ACCEPTING GRANT FUNDS ALLOCATED TO THE CITIZENS OPTION FOR PUBLIC SAFETY PROGRAM FUNDED FOR FY 2021-2022 THROUGH

THE STATE OF CALIFORNIA LOCAL SAFETY AND PROTECTION ACCOUNT ATTACHMENTS:
• COPS 2021-2022 Resolution (DOCX)
3 Packet Pg. 16
09/2023/cdz/A23-0180/Reso/COPSFundingFY21-22
RESOLUTION NO. 23-

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL CENTRO

ACCEPTING GRANT FUNDS ALLOCATED TO THE CITIZENS OPTION FOR PUBLIC SAFETY PROGRAM FUNDED FOR FY 2021-2022 THROUGH THE

STATE OF CALIFORNIA LOCAL SAFETY AND PROTECTION ACCOUNT WHEREAS, the State of California Transportation Fund’s Local Safety and Protection Account (the “LSPA”) has made funds available to law enforcement units of local government for the purpose of the Citizen’s Option for Public Safety (“COPS”) Program; and WHEREAS, the LSPA has tentatively awarded one hundred seventy-three thousand seven hundred fifty-six dollars and nineteen cents ($173,756.19) to the City of El Centro (the “City”) Police Department for operational funding exclusively for the COPS Program; and WHEREAS, the State Controller is required to allocate the COPS front-line enforcement funds to each county that has established a Supplemental Law Enforcement Services Fund (“SLESF”) and an oversight committee pursuant to Government Code §30064; and WHEREAS, in accordance with the LSPA program guidelines for the grant, it is the responsibility of the County of Imperial (the “County”), as the host agency, to disburse funding from their SLESF in one (1) installment; and
WHEREAS, in accordance with legislative requirements, the City must submit an itemized expenditure plan for the use of the funding allocation to the County for the review of and approval by the oversite committee; and
WHEREAS, the City Council of the City of El Centro, California, desires to accept the funds from the LSPA for the COPS Program.

NOW, THEREFORE THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS;

1. That the foregoing is true, correct and adopted.

2. That the City hereby accepts the grant funds of one hundred seventy-three thousand seven hundred fifty-six dollars and nineteen cents ($173,756.19), in one (1) installment, from the LSPA for the COPS Program.

3. That the El Centro Police Department’s itemized expenditure plan is as follows:
$61,258.00 Community Service Officer Salary & Benefits
$900.00 CSO Uniform Allowance
$111,598.19 Equipment

3.a
Packet Pg. 17
Attachment: COPS 2021-2022 Resolution (6179 : 2021-2022 COPS Grant) 09/2023/cdz/A23-0180/Reso/COPSFundingFY21-22

4. That the City Clerk is hereby directed to submit a copy of this resolution to the Imperial County Executive Office.

5. That the City Manager is authorized to execute on behalf of the City the grant award agreement, if any, for the COPS Program, a copy of which will be on file in the Office of the City Clerk, including any extensions or amendments thereof.

6. That the City agrees to comply with all requirements for the COPS Program (including any extensions or amendments thereof), and that funds will be appropriated as required thereby.

7. That grant funds received hereunder shall not be used to supplant expenditures controlled by this body.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of El Centro held on the day of , 2023

CITY OF EL CENTRO
By ___________________________
Martha Cardenas-Singh, Mayor
ATTEST:

By _______________________________
Norma Wyles, City Clerk
APPROVED AS TO FORM:

Office of the City Attorney
By _______________________________
Elizabeth Martyn, City Attorney

3.a
Packet Pg. 18
Attachment: COPS 2021-2022 Resolution (6179 : 2021-2022 COPS Grant) 09/2023/cdz/A23-0180/Reso/COPSFundingFY21-22

STATE OF CALIFORNIA )
COUNTY OF IMPERIAL ) ss

CITY OF EL CENTRO )
I, Norma Wyles, City Clerk of the City of El Centro, California, do hereby certify that the foregoing Resolution No. 23- was duly and regularly adopted at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2023, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAINED:

By ___________________________
Norma Wyles, City Clerk

3.a
Packet Pg. 19
Attachment: COPS 2021-2022 Resolution (6179 : 2021-2022 COPS Grant) City Council of the City of El Centro Meeting: 11/07/23 11:30 AM 1275 Main Street Department: Engineering Division
El Centro, CA 92243 Category: Personnel
Prepared By: Felix De Leon
SCHEDULED Department Head: Abraham Campos
ACTION ITEM (ID # 6178) DOC ID: 6178
Request to approve Plans and Specifications for the East Main Evan Hewes Highway Rehabilitation Project CRASL
5169 (057)
CITY MANAGER’S RECOMMENDATION:

Approve Plans and Specifications for the East Main Evan Hewes Highway Rehabilitation Project CRASL 5169 (057) and authorize staff to release for public bidding.

FISCAL IMPACT:

No Impact to the General Fund. This project is funded by SB1RMRA and Covid Relief STIP funds. Available budget is as follows, which will be updated once bids are received.

STIP $ 1,137,000
SB1RMRA $ 1,108,011
Total $ 2,245,011
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:

Goal #2 Environmental Sustainability & Infrastructure. Ensure the City's infrastructure is enhanced and maintained to support existing and future development through innovative and sustainable principles. Action 2.13 Implement 2015/2016 Pavement Management System Plan which consists of recommended street repair costs to the City's streets network
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE

DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTORS LICENSE, REFERENCE CHECKS, INSURANCE, ETC:

N/A
BACKGROUND:

City Staff applied and received allocations of State STIP funds in the amount of $1,137,000 to support the rehabilitation of Evan Hewes Highway / East Main St. from Dogwood Ave. to East City Limits (Cooley Road).

In addition, on May 16, 2023 council approved a resolution assigning anticipated RMRA funding of $1,108,011 in FY 23/24, to supplement and add to the available funding for this project.

DISCUSSION:

Engineering Staff has designed in-house the East Main Evan Hewes Highway Rehabilitation Project, resulting in design cost savings as compared to contracting out.

Rehabilitation of East Main Evan Hewes Highway will be from Dogwood to East City 4 Packet Pg. 20
Action Item (ID # 6178) Meeting of November 7, 2023
Limits (near Cooley Rd.)
County of Imperial will also work on rehabilitation of Evan Hewes Highway from East City Limits and continuing east towards SR-111. The County project is expected to commence in late 2023 to early 2024, and the city portion will follow in the second quarter of 2024, thus resulting in a complete rehabilitation from Dogwood Avenue to SR-111 between both projects.

Below is a tentative Schedule for this project:

Schedule:

Approval of Plans and Specs November 7, 2023
Advertise Project November 17, 2023
Pre-Bid Meeting TBD
Bid Opening December 21, 2023
Construction Award January 16, 2024
Construction Commence March 4, 2024
Construction Completed May 6, 2024
CONCLUSION:

Approve Plans and Specifications for the East Main Evan Hewes Highway Rehabilitation Project CRASL 5169 (057) and authorize staff to release for public bidding.

ATTACHMENTS:
• Evan Hewes Specifications (PDF)
• EVAN HEWES signed PLANS APPROVED (PDF)
4 Packet Pg. 21

4.a
Packet Pg. 22
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro

EAST MAIN EVAN HEWES HWY REHABILITATION PROJECT
10/2023/cdz/A23-0210

EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT

TABLE OF CONTENTS
PAGE
NOTICE INVITING SEALED PROPOSALS (BIDS) NIB 1 - 6
BIDDING DOCUMENTS BD 1 - 20
CONTRACT DOCUMENTS CD 1 - 17
Agreement CD 1 - 13
Performance Bond CD 14-15
Payment Bond CD 16-17
GENERAL CONDITIONS GC 1-68
SUPPLEMENTAL GENERAL CONDITIONS SGC 1 - 3
SPECICATIONS S 1 – 1
SPECIAL PROVISIONS SP 1 –

4.a
Packet Pg. 23
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro

EVAN HEWES HWY REHABILITATION PROJECT
NIB 1

NOTICE INVITING BIDS
RECEIPT OF BIDS: Sealed Bids will be received at the office of the City Clerk, City of El Centro, OWNER of the WORK, located at 1275 Main Street, El Centro, CA 92243, until , 2023, at 2:00 p.m. for the construction of the “EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT”
DESCRIPTION OF WORK: The WORK includes but is not limited to:

The work shall include grinding of existing asphalt concrete pavement, installation of asphaltrubber and aggregate membrane, gap graded asphalt-rubber hot mix, conventional-asphalt concrete, minor aggregate base, monument preservation, utility cover adjustments and traffic control as described in Chapter 5 of the Caltrans Traffic Manual and the latest edition of Manual of Uniform Traffic Control Devices (“California MUTCD”).

The scope of work is more specifically described on the construction plans and in these Specifications.

SITE OF WORK: The site of the WORK is located on Commercial Ave. from 3rd St. to Dogwood Ave. within City right of way.

COMPLETION OF WORK: The WORK must be completed within (45) consecutive calendar days after the commencement date stated in the Notice to Proceed.

OPENING OF BIDS: The Bids will be publicly opened and read at 2:00 PM on , 2023 at the above-mentioned office of the City Clerk’s.

OBTAINING CONTRACT DOCUMENTS: The Contract Documents are entitled “COMMERCIAL AVE. IMPROVEMENTS PROJECT”
The Contract Documents may be obtained by download free at Planetbids by visiting City of El Centro website and selecting “Public Works (Planetbids) from the “DOING BUSINESS” drop down, Bids and Proposal tab, or at the following link https://www.planetbids.com/portal/portal.cfm?companyID=41180 PRE-BID CONFERENCE: A mandatory Prebid Conference for prospective Bidders will be held at the City of El Centro at 10:00 AM (prevailing local time), on , 2023. The meeting will be held at . The object of the meeting is to acquaint Bidders with the site conditions and mandatory bidding requirements and subcontractors with subcontracting and material supply opportunities. At that meeting, the City of El Centro’s Equal Opportunity Program (DBE) goals and reporting procedures also will be discussed.

4.a
Packet Pg. 24
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro

EVAN HEWES HWY REHABILITATION PROJECT
NIB 2
QUESTIONS: Technical questions must be submitted through Planetbids. Should Planetbids be unavailable questions should then be directed to the OWNER at [email protected] Questions must arrive at least (10) calendar days prior to the bid opening to allow time for distributing answers and/or clarifications to plan holders. No oral comments shall be of any force or effect with respect to this solicitation.

CITY’S RESPONSES: Responses to timely questions asked may be provided via Addenda.

ALL SUBMISSIONS MUST BE BY PERSONAL DELIVERY OR BY MAIL. No electronic submissions will be accepted.

REQUIRED DOCUMENTS AS PART OF THE BID:

The bid shall be considered incomplete and be disqualified if any of the required BIDDING DOCUMENTS in pages BD 1to BD 20 of this solicitation are not provided as instructed.

BID SECURITY: Each Bid shall be accompanied by a certified or cashier’s check or bid bond in the amount of ten (10) percent of the total Bid price payable to the City of El Centro as a guarantee that the Bidder, if its bid is accepted, will promptly execute the Agreement. A bid shall not be considered unless one of the forms of bid security is enclosed with it.

BIDS TO REMAIN OPEN: The Bidder shall guarantee the total Bid price for a period of one hundred twenty (120) calendar Days from the date of Bid opening.

CONTRACTOR’S LICENSE CLASSIFICATION: In accordance with the provisions of California Law, OWNER has determined that CONTRACTOR shall possess a valid Class A California contractor’s license at the time that the Bid is submitted. Failure to possess the specified license shall render the Bid non-responsive and shall act as a bar to award of the Agreement to any Bidder not possessing said license at the time of Bid.

CALIFORNIA WAGE RATE REQUIREMENTS: In accordance with the provisions of California Labor Code sections 1770 et seq. as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in such sections for the locality in which the WORK is to be performed.

A copy of said wage rates is on file at the office of OWNER. It shall be mandatory for CONTRACTOR to whom the WORK is awarded, and upon any Subcontractor under CONTRACTOR, to pay not less than said specified rates to all workers employed by them in the execution of the WORK.

CONTRACTOR AND SUBCONTRACTOR REGISTRATION WITH DEPARTMENT OF INDUSTRIAL RELATIONS:

4.a
Packet Pg. 25
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro

EVAN HEWES HWY REHABILITATION PROJECT
NIB 3
Labor Code section 1771.1 provides that a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Public Contract Code section 4104, or engage in the performance of any contract for public work, as that term is defined in Chapter 1, Part 7, Division 2 of the Labor Code, unless currently registered and qualified to perform public work pursuant to Labor Code section 1725.5. Labor Code section 1771.1 also provides that it is not a violation of that section for an unregistered contractor to submit a bid that is authorized by Business and Professions Code section 7029.1 or by Public Contract Code section 10164, provided the contractor is registered to perform public work pursuant to Labor Code section 1725.5 at the time the contract is awarded.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

RETAINAGE FROM PAYMENTS: CONTRACTOR may elect to receive one hundred (100%) percent of payments due under the Contract Documents from time to time, without retention of any portion of the payment by OWNER, by depositing securities of equivalent value with OWNER in accordance with the provisions of section 22300 of the Public Contract Code. Such securities, if deposited by CONTRACTOR, shall be valued by OWNER, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit or any other security mutually agreed to by CONTRACTOR and OWNER.

FILING OF BID PROTESTS:

By submitting a Bid, each Bidder hereby agrees and understands that the Bidder must comply with these protest procedures and exhaust all administrative remedies set forth herein prior to the initiation of any type of related legal action. Subject to the requirements of applicable law, this protest procedure can also be used to resolve issues surrounding the City’s determination of a Bidder as not responsible. The following terms as used in this Section shall have the following meanings:
“Protest” shall mean a written objection by an interested party or affected party to (i) the requirements or specifications contained in the Notice to Bidders or any portion of documents accompanying that notice; or (ii) a proposed award recommendation.

A. Solicitation Phase Protest.

The purpose of the solicitation is to obtain competitive Bids from Bidders. Any Bidder who has submitted a bid and who believes that a particular specification or requirement is impractical, unduly restrictive, or ambiguous may advise the AGENCY of its concerns by submitting a detailed solicitation protest statement in accordance with the requirements set forth below in this Section A. The Protest does not replace the requirement to report irregularities in the bid documents. (1) Contents and Requirements

4.a
Packet Pg. 26
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro

EVAN HEWES HWY REHABILITATION PROJECT
NIB 4
A solicitation protest must be submitted to the contact named in the bid documents by personal delivery or email by close of business at least fifteen (15) calendar days prior to the Bid due date, and must contain all of the following to be considered:
a. The name, address, and telephone number of the protester; and b. The Project Name and Project Number; and
c. A detailed statement setting forth the grounds for protest, which shall include all the factual and legal documentation in support of the protest in sufficient detail to establish merits of the protest; and
d. The desired resolution of the protest.

If the submitted protest does not comply with the requirements set forth herein, then it will not be considered for evaluation and will be returned to the protestor. Any grounds for protest not raised are waived. The protest may not be amended after filing. The protest is a public document.
(2) Evaluation and Determination
No hearing will be held on the protest. City’s Public Works Director, or designee, will review the protest and any supporting material and conduct an investigation of the facts.

That City representative may, but need not, require other Bidders to submit statements or arguments regarding the protest and may discuss the protest with the protestor. The Public Works Director or designee shall issue a final written decision regarding any solicitation protest to each Bidder prior to opening of bids. The written decision will cite any actions that will or will not be taken in response to the protest. That decision shall be final, and there shall be no further administrative recourse, including no protest of an award.

B. Protest of Award
(1) Contents and Requirements
Following the opening of the Bids, but before formal award of the bid, any Bidder may protest City’s proposed award of the Contract by submitting a written protest to the Office of the City Clerk, 1275 W. Main Street, El Centro CA, 92243, attention Public Works Director or designee (“Public Works Director”), no later than close of business on the fifth business day after the opening of the bids. That protest must be submitted in a timely manner, signed by the protesting Bidder, and must contain all of the following to be considered:
a. The name, address, and telephone number of the protestor; and b. The Project Name and Project Number; and
c. The City action or recommendation that is being protested;

4.a
Packet Pg. 27
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro

EVAN HEWES HWY REHABILITATION PROJECT
NIB 5
d. A detailed statement setting forth every ground, reason, legal authority and facts in support of the protest, including all documents and evidence including specific references to parts of the bid documents; and
e. A clear statement of the relief requested.
f. The party filing the protest must concurrently transmit a copy of the initial protest document and any attached documentation to all other bidding parties.

A protest that does not comply with the requirements set forth herein will be returned to the protestor. The protest shall not be amended after filing. Any grounds for protest not raised are waived. The protest is a public document.
(2) Evaluation and Determination
The protested bidder may file responsive statements to the protest with the City, with a copying to the protesting bidder, within three (3) business days after the receipt of the protest. Any other responding bidder shall transmit its response to the protesting Bidder concurrent with delivery to the City. The Public Works Director shall review the facts and all submittals relative to the protest and shall issue a written decision setting forth the basis for such decision. The written decision will be issued to the protestor and to all affected parties. Unless otherwise required by law, no hearing shall be provided. In the event a hearing is conducted, the Public Works Director shall issue written notice to the protestor and affected parties identifying the date and time for the hearing, along with rules concerning the hearing.

C. Delay in Award
Award of any proposed contract may be delayed pending the resolution of the protest unless one or more of the following conditions is present:

1. The items or services being procured are urgently required;

2. Delivery or performance will be unduly delayed by failure to make award promptly; or

3. Failure to make prompt award will otherwise cause undue harm to the City.

D. No Limitations on Remedies
Nothing contained herein shall be construed to act as a limitation of the City’s choice of remedies or confer any right upon any interested party or affected party to a remedy.

E. Basis for Choice Remedy
In determining the appropriate remedy, the City shall consider all of the circumstances surrounding the notice of bids and/or award, including, but not limited to:

1. The seriousness of any deficiency found to exist in the contracting process;

2. The effect of the action on the competitive process;

4.a
Packet Pg. 28
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro

EVAN HEWES HWY REHABILITATION PROJECT
NIB 6

3. Any urgency surrounding the requirement to enter into a contract; and

4. The effect that implementing the remedy will have on the City.

F. Remedies
If the City determines that the proposed award was not made in accordance with applicable statues, regulations, policies and/or procedures, the City, in its sole discretion, may grant any of the following remedies or any other remedy it deems appropriate:

1. Prior to award, City may do the following
(a) reject all bids and determine not to proceed with the project at that time; (b) reject all bids and issue a new solicitation;
(c) make a new selection/award recommendation to the next lowest qualified bidder; or
(d) award the contract consistent with applicable statutes, regulations, policies and procedures;

2. In its sole discretion, take no further action; or

3. Take any other action that is permitted by law to promote compliance.

OWNER’S RIGHTS RESERVED: OWNER reserves the right to reject any or all Bids, to waive any informality in a Bid, and to make awards to the lowest responsive Bidder as it may best serve the interest of OWNER.

LIQUIDATED DAMAGES: The project carries liquidated damages provisions of $2,000 per day per the Contract Documents.

OWNER’S RIGHTS RESERVED: OWNER reserves the right to reject any or all Bids, to waive any and all bid proposals and to waive any technical irregularities, to accept any bid or portion thereof, and to take all bids under advisement for a period of 120 days, and to make awards to the lowest responsive Bidder as it may best serve the interests of OWNER. All bids are provided at the sole expense of the Bidder.

Date:____________________ OWNER: City of El Centro

_________________________
Norma Wyles, City Clerk

4.a
Packet Pg. 29
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro

EVAN HEWES HWY REHABILITATION PROJECT
NIB 7
- END OF NOTICE INVITING BIDS -

4.a
Packet Pg. 30
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 1

BIDDING DOCUMENTS

INSTRUCTIONS TO BIDDERS

1. DEFINED TERMS. Terms used in these Instructions to Bidders and the Notice Inviting Bids which are defined in the General Conditions have the meanings assigned to them in the General Conditions. The term “Bidder” means one who submits a Bid directly to OWNER, as distinct from a sub-bidder, who submits a Bid to a Bidder.

2. INTERPRETATIONS AND ADDENDA

2.1 All questions about the meaning or intent of the Contract Documents are to be directed to OWNER. Interpretations or clarifications considered necessary by OWNER in response to such questions will be issued by Addenda. Questions received less than Ten (10) Days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

2.2 Addenda may also be issued to modify the Contract Documents as deemed advisable by OWNER.

3. COMPETENCY OF BIDDERS. In selecting the lowest responsive Bidder, consideration will be given not only to the financial standing but also to the general competency of the Bidder for the performance of the WORK covered by the Bid. Bidders must possess a valid California contractor’s license applicable to the type of work bid upon at the time of opening Bids.

4. EL CENTRO BUSINESS LICENSE. All Bidders and their Subcontractors not already having a business license from the City of El Centro for the WORK will be required to secure the appropriate license from the City of El Centro before the Agreement can be executed.

5. DISQUALIFICATION OF BIDDERS. More than one (1) Bid from an individual, firm, partnership, corporation or association under the same or different names will not be considered. If OWNER believes that any Bidder is interested in more than one (1) Bid for the WORK contemplated, all Bids in which such Bidder is interested will be rejected. If OWNER believes that collusion exists among the Bidders, all Bids will be rejected. A party who has quoted prices to a Bidder is not hereby disqualified from quoting prices to other Bidders, or from submitting a Bid directly for the WORK.

6. BIDDER’S EXAMINATION OF CONTRACT DOCUMENTS AND SITE

6.1 It is the responsibility of each Bidder before submitting a Bid:
(a) To examine thoroughly the Contract Documents and other related data identified in the Bidding Documents (including “technical data” referred to below);

4.a
Packet Pg. 31
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 2
(b) To visit the site to become familiar with and satisfy Bidder as to the general and local conditions that may affect cost, progress or performance of the WORK; (c) To consider Federal, State and local Laws and Regulations that may affect cost, progress or performance of the WORK;
(d) To study and carefully correlate the Bidder’s knowledge and observations with the Contract Documents and other related data; and
(e) To notify OWNER of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related data.

6.2 Reference is made to the Supplementary General Conditions for identification of:
(a) Those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by OWNER in the preparation of the Contract Documents.

The Bidder may rely upon the accuracy of the technical data contained in such reports; however, the interpretation of such technical data, including any interpolation or extrapolation thereof, together with non-technical data, interpretations and opinions contained therein or the completeness thereof is the responsibility of the Bidder. (b) Those drawings of physical conditions in or relating to existing surface and subsurface conditions (except Underground Utilities) which are at or contiguous to the site that have been utilized by OWNER in the preparation of the Contract Documents. The Bidder may rely upon the accuracy of the technical data contained in such drawings; however, the interpretation of such technical data, including any interpolation or extrapolation thereof, together with nontechnical data, interpretations and opinions contained in such drawings or the completeness thereof is the responsibility of the Bidder.

Subsurface conditions, including but not limited to groundwater, may have changed significantly between the completion of the soils investigation by the geotechnical engineer and start of construction. Subsurface conditions, including but not limited to groundwater, may change significantly during construction.

6.3 Copies of such reports and drawings will be made available by OWNER to any Bidder on request if said reports and drawings are not bound herein. Those reports and drawings are not part of the Contract Documents, but the technical data contained therein upon which the Bidder is entitled to rely, in Paragraph SGC-4.2 of the Supplementary General Conditions has been identified and established.

4.a
Packet Pg. 32
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 3

6.4 Information and data reflected in the Contract Documents with respect to Underground Utilities at or contiguous to the site is based upon information and data furnished to OWNER by the owners of such Underground Utilities or others, and OWNER does not assume responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the Supplementary General Conditions or the section entitled “Protection and Restoration of Existing Facilities” of the General Requirements.

6.5 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders on subsurface conditions, Underground Utilities and other physical conditions, and possible changes in the Contract Documents due to differing conditions appear in Paragraphs 4.2, 4.3, and 4.4 of the General Conditions.

6.6 Before submitting a Bid, each Bidder will, at Bidder’s own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and Underground Utilities) at or contiguous to the site or otherwise which may affect cost, progress or performance of the WORK or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Bidder and Safety precautions and programs incident thereto which the Bidder deems necessary to determine its Bid for performing the WORK in accordance with the time, price and other terms and conditions of the Contract Documents. Interference with existing facility operations will not be permitted.

6.7 On request in advance, OWNER will provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and shall clean up and restore the site to its former condition upon completion of such examinations, investigations, explorations, tests and studies.

6.8 The lands upon which the WORK is to be performed, rights-of-way and easements for access thereto and other lands designated for use by CONTRACTOR in performing the WORK are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by CONTRACTOR. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by OWNER unless otherwise provided in the Contract Documents.

4.a
Packet Pg. 33
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 4

6.9 The submission of a Bid will constitute an incontrovertible representation by the Bidder that the Bidder has complied with every requirement of this Paragraph 6, “Bidder’s Examination of Contract Documents and Site” herein, that without exception the Bid is premised upon performing the WORK required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction (if any) as may be indicated in or required by the Contract Documents, that Bidder has given OWNER written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolution thereof by OWNER is acceptable to Bidder and the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of the WORK.

7. BID FORM.

7.1 The Bid shall be made on the Bid schedule bound herein and the pages may be removed from the bound volume. The envelope enclosing the sealed Bids shall be plainly marked in the upper left-hand corner with the name and address of the Bidder and shall bear the words “BID FOR” followed by “EAST MAIN EVAN HEWES HWY REAHBILITATION PROJECT,” El Centro, CA, 92243, and the date and hour of opening of Bids. The Bid security shall be enclosed in the same envelope with the Bid.

7.2 All blanks on the Bid form must be completed in ink.

7.3 Bids by corporations must be executed in the corporate name by the president and a vice-president. Bids signed by other corporate officer or the project manager shall be accompanied by the enclosed certificate of authority to sign, attested by the secretary or assistant secretary, and with the corporate seal affixed. The corporate address and state of incorporation must appear below the signature.

7.4 Bids by partnerships must be executed in the partnership name and be signed by a managing partner, accompanied by evidence of authority to sign and his/her title must appear under the signature and the official address of the partnership must appear below the signature.

7.5 All names must be printed below the signature.

7.6 The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid form. Failure to acknowledge Addenda shall render the Bid non-responsive and shall be cause for its rejection.

7.7 The address to which communications regarding the Bid are to be directed must be shown.

4.a
Packet Pg. 34
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 5

7.8 All Bidders must provide evidence of authority to conduct business in California to the extent required by law.

8. QUANTITIES OF WORK. The quantities of work or material stated in unit price items of the Schedule of Values are supplied only to give an indication of the general scope of the WORK; OWNER does not expressly or by implication agree that the actual amount of work or material will correspond therewith, and reserves the right after award to increase or decrease the amount of any unit price item of the WORK in accordance with Article 10 of the General Conditions, to delete any Bid item in its entirety, or to add additional Bid items up to and including an aggregate total amount not to exceed twenty-five (25) percent of the Contract Price.

9. SUBSTITUTE OR “OR EQUAL” ITEMS. Whenever materials or equipment are specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular supplier and the name is followed by the words “or equal,” the Bidder may write the name of a substitute supplier (which the Bidder considers as an “or equal”) in the Proposed Substitute Equipment/Material Supplier List in the Bid form.

These substitute suppliers will only be considered after award of the Agreement. The procedure for the submittal of substitute or “or equal” products is specified in section 6.7 of the General Conditions.

10. SUBMISSION OF BIDS. The Bid shall be delivered by the time and to the place set forth in the Notice Inviting Bids. It is the Bidder’s sole responsibility to see that its Bid is received in proper time.

11. BID SECURITY, BONDS AND INSURANCE. Each Bid shall be accompanied by a certified or cashiers’ check or approved Bid bond in the amount stated in the Notice Inviting Bids. Said check or bond shall be made payable to the City of El Centro and shall be given as a guarantee that the Bidder, if awarded the Agreement, will enter into an Agreement with OWNER, and will furnish the necessary insurance certificates, payment bond and performance bond; each of said Bonds to be in the amount stated in the Supplementary General Conditions. In case of refusal or failure to enter into said Agreement, the check or Bid bond, as the case may be, shall be forfeited to OWNER. If the Bidder elects to furnish a Bid bond as its Bid security, the Bidder shall use the Bid bond form bound herein, or one conforming substantially to it in form.

12. DISCREPANCIES IN BIDS. In the event of a discrepancy between words and numbers in the Bid, the words shall govern. In the event there are unit price Bid items in the Schedule of Values and the amount indicated for a unit price Bid item does not equal the product of the unit price and quantity, the unit price shall govern and the amount will be corrected accordingly, and the Bidder shall be bound by said correction. In the event there is more than one (1) Bid item in the Schedule of Values and the total indicated for the schedule does not agree with the sum of the prices bid on the individual items, the prices bid on the individual items shall govern and the total for the schedule will be corrected accordingly, and the Bidder shall be bound by said correction.

4.a
Packet Pg. 35
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 6

13. MODIFICATIONS AND UNAUTHORIZED ALTERNATIVE BIDS. Unauthorized conditions, limitations or provisos attached to the Bid will render it informal and may cause its rejection as being non-responsive. The completed Bid forms shall be without interlineations, alterations or erasures in the printed text. Alternative Bids will not be considered unless called for. Oral, telegraphic or telephonic Bids or modifications will not be considered.

14. WITHDRAWAL OF BID. The Bid may be withdrawn by the Bidder by means of a written request, signed by the Bidder or its properly authorized representative. Such written request must be delivered to the place stipulated in the Notice Inviting Bids for receipt of Bids prior to the scheduled closing time for receipt of Bids.

15. BID RESULTS. To obtain bid results, provide a self-addressed, stamped envelope, referencing “COMMERCIAL AVE. IMPROVEMENTS PROJECT.” Bid tabulation will be mailed to you after verification of extensions. Bid results will not be given out over the telephone. Bid results may be posted on City’s website.

16. AWARD OF CONTRACT. Award of a contract, if it be awarded, will be on the basis of the Bid proposal estimated quantities and will be made to the lowest responsive Bidder whose Bid complies with all the requirements prescribed. Unless otherwise specified, any such award will be made within the period stated in the Notice Inviting Bids that the Bids are to remain open. Unless otherwise indicated, a single award will be made for all the Bid items in an individual Bid schedule. The lowest Bid shall be the lowest price on the Total BID.

17. RETURN OF BID SECURITY. Within fourteen (14) Days after award of the Agreement, OWNER will return the Bid securities accompanying such of the Bids as are not considered in making the award. All other Bid securities will be held until the Agreement has been finally executed. They will then be returned to the respective Bidders whose Bids they accompany.

18. EXECUTION OF AGREEMENT. The apparent low Bidder will be required to execute a written Agreement with OWNER on the form of agreement provided, shall secure all insurance and shall furnish all certificates and Bonds required by the Contract Documents within fourteen (14) calendar Days after receipt of notification that the Bidder is the apparent low Bidder. Failure or refusal to enter into an Agreement as herein provided or to conform to any of the stipulated requirements in connection therewith shall be considered non-responsive and result in the forfeiture of the Bid security. If the lowest responsive Bidder refuses or fails to execute the Agreement, OWNER may proceed to the second lowest responsive Bidder. If the second lowest responsive Bidder refuses or fails to execute the Agreement, OWNER may proceed to the third lowest responsive Bidder. On the failure or refusal of such second or third lowest Bidder to execute the Agreement, each such Bidder’s Bid securities shall be likewise forfeited to OWNER.

4.a
Packet Pg. 36
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 7

19. LIQUIDATED DAMAGES. Provisions for liquidated damages in the amount of $2,000 per day are set forth in the Agreement Section XVIII.

20. WORKERS’ COMPENSATION REQUIREMENT. The Bidder should be aware that in accordance with section 3700 of the California Labor Code it will, if awarded the Agreement, be required to secure the payment of compensation to its employees and execute the Workers’ Compensation Certification in the form contained in these Contract Documents.
- END OF INSTRUCTIONS TO BIDDERS -

4.a
Packet Pg. 37
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 8
SECTION 00300A

BID FORMS
BID TO: CITY OF EL CENTRO

1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Contract Documents (as defined in Article 6 of the Agreement) to perform the WORK as specified or indicated in said Contract Documents entitled “EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT

2. Bidder accepts all of the terms and conditions of the Contract Documents, including without limitation those in the Notice Inviting Bids and Instructions to Bidders, dealing with the disposition of the Bid security.

3. This Bid will remain open for the period stated in the Notice Inviting Bids unless otherwise required by law. Bidder will enter into an Agreement within the time and in the manner required in the “Notice Inviting Bids” and the “Instructions to Bidders,” and will furnish the insurance certificates, Payment Bond and Performance Bond required by the Contract Documents.

4. Bidder has examined copies of all the Contract Documents including the following Addenda (receipt of all of which is hereby acknowledged):

Number ______ ______ ______ ______ ______ ______
Date ______ ______ ______ ______ ______ ______

5. Bidder has familiarized itself with the nature and extent of the Contract Documents, WORK, site, locality where WORK is to be performed, the legal requirements (Federal, State and local laws, ordinances, rules and regulations) and the conditions affecting cost, progress or performance of the WORK and has made such independent investigations as Bidder deems necessary.

To all the foregoing, and including all Bid schedule(s) and information required of Bidder contained in this Bid form, said Bidder further agrees to complete the WORK required under the Contract Documents within the Contract Time set forth in said Contract Documents, and to accept in full payment therefore the Contract Price based on the total Bid price(s) named in the aforementioned Bid schedule(s).

Dated: Bidder:

By:
(Signature)
Title:

4.a
Packet Pg. 38
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 9

BID SCHEDULE - PRICES
Pursuant to and in compliance with the Invitation for Bids and other Contract Documents relating to the proposal for the construction of

EAST MAIN STREET EVAN HEWES REHABILITATION PROJECT
all in accordance with the Drawings and Project Specifications the undersigned Bidder, having familiarized himself with the terms of the Agreement, the local conditions affecting the performance of the Agreement and the cost of the WORK at the place the WORK is to be done; and with the Drawings, Project Specifications and other Contract Documents, hereby stipulated; CONTRACTOR agrees to complete the Agreement, including all of its component parts and everything required to be performed, and to provide and furnish any and all labor, materials, equipment, tools, expendable supplies, and all utility and transportation services necessary to perform the Agreement, and complete in a workmanlike manner all of the WORK required in connection with the Agreement, all in strict conformance with the Drawings and Specifications for the following prices and sum.

The following Bid Schedule of estimated quantities is included for convenience of bidding and a basis for comparison of Bids only, and CITY does not, expressly, or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the WORK, or to delete portions of the WORK, as may be deemed necessary or advisable by CITY.

All Bidders are REQUIRED to use unit prices where indicated and to complete this schedule.

All items shall be complete and in place per Plans and these Bid and Contract Documents.

Note: Payment for all work (labor, material, equipment, etc.) required for the construction and installation of the improvement as shown on the plans which is not specifically identified below in the Bid Schedule shall be considered as included in the CONTRACTOR’s price, as itemized below, for the various items of work for which the work is required, and no additional compensation shall be made therefor.

4.a
Packet Pg. 39
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 10

PROPOSAL BID FORM
TO THE DIRECTOR OF PUBLIC WORKS OF THE CITY OF EL CENTRO:

The undersigned hereby declares that he has carefully examined the location of the proposed work, that he has examined the plans and specifications and read the accompanying instructions to bidders and hereby proposes to furnish all material except owner furnished materials, and do all work required to complete the said work in accordance with said plans and specifications and special provisions for the unit prices set forth in the following schedule. The bidder shall furnish prices for all items shown in the proposal.

BASE BID SCHEDULE
Item Description
Unit Amount Unit
Price Total Price
1 MOBILIZATION / DEMOBILIZATION /

REQUIRED PERMITS
LS 1

2 TRAFFIC CONTROL LS 1
3 0.2’ COLD MILL SY 43,000
4 INSTALL 3/8” ARAM, INCLUDING TACK
COAT
SY 43,000

5 INSTALL 0.2” OF GAP GRADED RHMA,

INCLUDING TACK COAT
TON 5,800

6 INSTALL 0.2” OF CONVENTIONAL 3/4”
HMA TYPE-A PG 70-10, INCLUDING TACK
COAT
TON 200

7 4’ SHOULDER SHAPING ALONG EDGE OF
ROAD to 1:8 max slope
LF 10,900

8 DOUBLE ADJUST WATER VALVE EA 12
9 DOUBLE ADJUST MANHOLE EA 12
10 MONUMENT PRESERVATION

CERTIFICATE, RE-ESTABLISHMENT OF

MONUMENTS NOT FOUND IN THE WORK

AREA & PROTECTION OF THOSE THAT
ARE.

LS 1

11 EROSION CONTROL LS 1
12 MATERIAL TESTING LS 1
13 STREET STRIPING AND PAVEMENT

MARKINGS
LS 1

Total: $__________________________

4.a
Packet Pg. 40
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 11
Total Bid is:
$_____________________ (Amount of Total Base Bid written numerically as dollars and cents, in US dollars)
$ ___________________________________________________________________________ (Amount of Total Base Bid written in words as dollars and cents, in US dollars)

END OF PROPOSAL BID FORM

4.a
Packet Pg. 41
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 12

LIST OF SUBCONTRACTORS
The Bidder shall list below the name and the location of the place of business of each Subcontractor who will perform work or labor or render service to CONTRACTOR in or about the construction of the WORK, or a Subcontractor licensed by the State who, under subcontract to CONTRACTOR, specially fabricates and installs a portion of the WORK according to detailed Drawings contained in the plans and specifications, in an amount in excess of one-half (0.5) of one (1.0) percent of CONTRACTOR’s total Bid. The Bidder shall also list below the portion of the WORK which will be done by each Subcontractor under this contract.

CONTRACTOR shall list only one (1) Subcontractor for each portion of the WORK. If Bidder does NOT intend to use ANY subcontractors, state “NONE” in the first block.

Substitutions of subcontractors listed will not be permitted unless approved by the City of El Centro.

The Bidder’s attention is directed to Paragraph 6.5.3 entitled “Subcontract Limitations” of the General Conditions which sets forth the percent of the WORK to be performed with the Bidders’ own forces. Failure to comply with this requirement will render the Bid nonresponsive and may cause its rejection.

PORTION OF WORK NAME OF

SUBCONTRACTOR

DIR REGISTRATION
NUMBER

PLACE OF BUSINESS

ADDRESS/TELEPHONE
No.

USE ADDITIONAL FORMS AS NECESSARY

4.a
Packet Pg. 42
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 13

GENERAL INFORMATION
BIDDER’S GENERAL INFORMATION:

The Bidder shall furnish the information requested below. Additional sheets shall be attached as required. Failure to complete Item Nos. 1 through 3 will cause the Bid to be non-responsive and shall cause its rejection. In any event, no award will be made until all of the Bidder’s general information (i.e., items 1 through 3, inclusive) is delivered to OWNER.

INFORMATION TO BE PROVIDED BY ALL BIDDERS WITH BID SUBMITTAL:

PROVIDE A COMPLETE COPY OF THE MOST CURRENT LICENSE
(1) CONTRACTOR’s name and address:

(2) CONTRACTOR’s telephone number: FAX number:
(3) CONTRACTOR’s license: Primary classification
California State License No. and Expiration Date
Supplemental classifications held, if any:

Name of Licensee, if different from (1) above:

To be considered for award, CONTRACTOR shall have met all requirements established by OWNER of the Project.
- END GENERAL INFORMATION –

4.a
Packet Pg. 43
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 14

NONCOLLUSION DECLARATION

TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
The undersigned declares:

I am the __________________ of ______________________, the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding.

The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ____________ [date], at ______________________ [city], ________________________ [state]. - END NONCOLLUSION DECLARATION –

4.a
Packet Pg. 44
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 15

BID BOND

KNOW ALL MEN BY THESE PRESENTS,
That _____________________________ as Principal, and ____________________as Surety, are held and firmly bound unto the City of El Centro, hereinafter called “OWNER,” in the sum of __________________________ dollars, (_______________) (not less than ten (10) percent of the total amount of the Bid) for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

WHEREAS, said Principal has submitted a Bid to said OWNER to perform the WORK required under the Bid schedule(s) of OWNER’s Contract Documents entitled:

NOW THEREFORE, if said Principal is awarded a contract by said OWNER and, within the time and in the manner required in the Notice Inviting Bids and the Instructions to Bidders enters into a written Agreement on the form of agreement bound with said Contract Documents, furnishes the required certificates of insurance and furnishes the required Performance Bond and Payment Bond, then this obligation shall be null and void, otherwise it shall remain in full force and effect. In the event suit is brought upon this Bond by said OWNER and OWNER prevails, said Surety shall pay all costs incurred by said OWNER in such suit, including reasonable attorneys’ fee to be fixed by the court and actual costs.

SIGNED AND SEALED, this day of , 20
(SEAL) (SEAL)
(Principal) (Surety)
By: By:
(Signature) (Signature)

(SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETY)
- END BID BOND –

4.a
Packet Pg. 45
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 16

CORPORATE CERTIFICATION
OR

PARTNERSHIP INFORMATION
Name of Corporation or Partnership________________________________________________ State of Incorporation___________________________________________________________ List names and addresses of each partner, or titles, names and business addresses of President, Secretary and Treasurer.
______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ Date_____________________________ Contractor__________________________ Signature_________________________ Title________________________________ ATTEST:
__________________________________
Signature by
__________________________________
Title

END OF CORPORATE CERTIFICATION OR PARTNERSHIP INFORMATION

4.a
Packet Pg. 46
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 17

DRUG/ALCOHOL TESTING REQUIREMENTS
CONTRACTOR shall execute the following form as required by the Federal Drug and Alcohol, Section 49 CFR Part 382.

I agree to comply with the provisions of Federal Omnibus Transportation Employee Testing Act of 1991, and that I will administer a program of alcohol and drug testing of all commercial vehicle operators, as required by Federal Regulations.

CONTRACTOR certifies compliance with the City of El Centro’s Drug and Alcohol Free Workplace Policy as a condition of the State Drug-Free Workplace Act of 1990 (Government Code sections 8350 et seq.) and the Federal Drug Free Workplace Act of 1988 (41 U.S.C.A. Sections 701 et seq.) In addition, CONTRACTOR agrees to submit a copy of its own drug free workplace policy.

Dated_____________________________

________________________________________
CONTRACTOR’s Name
_________________________________________
CONTRACTOR’s Signature
_________________________________________
Title
- END DRUG/ALCOHOL TESTING REQUIREMENTS –

4.a
Packet Pg. 47
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 18
WORKERS’ COMPENSATION CERTIFICATE
(AS REQUIRED BY SECTION 1861

OF THE CALIFORNIA LABOR CODE)
I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the WORK of this Agreement.

CONTRACTOR:

By:

Title:
- END OF WORKERS’ COMPENSATION CERTIFICATE –

4.a
Packet Pg. 48
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 19

SITE VISIT CERTIFICATE
THIS IS TO CERTIFY that:

I, ___________________________________________________(name of bidder or his representative) of the _____________________________________________________ (name of construction firm) visited the site in connection with the Bid for the ______________________________________________________________ (name of the Project.)
Having examined the bid documents, I certify that I have acquainted with the nature, geographical and exact location of the works; the general conditions of execution; the neighboring buildings and other constraints that might affect the construction methods; the obligation not to obstruct the traffic where requested, or the flow of any water; the physical conditions specific to the construction sites; the climatic conditions; local conditions; means of communication and transport; the possibility of supplying water, electricity and fuel; the availability of labor sufficient in number and quantity; all constraints and obligations resulting from social, tax and customs legislation; and all conditions and circumstances which might influence the execution or price of the works.

I further certify that I am satisfied with the description of the works and the Project Engineer’s explanations and that I understand perfectly the works to be undertaken as specified and implied in the execution of the Contract.
______________________________________________
(Name and Signature of Bidder or his Representative)

Date : ______________________
Note 1: This form shall be completed at the time of the visit to the site where the works are to be carried out.
- END OF SITE VISIT CERTIFICATE –

4.a
Packet Pg. 49
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
Evan Hewes Highway Rehabilitation Project
BD 20
CONTRACTOR’S CERTIFICATION OF QUALIFICATION

FOR LICENSE CLASSIFICATION
After award of the contract, the Contractor, whether an individual, co-partnership, limited partnership, corporation, or any other combination or organization, shall execute the following form:

1. If an individual, I hereby certify that I am, or my responsible managing employee ________________________ (insert name) is, qualified for the license classification called for in these contract documents.

2. If a co-partnership or limited partnership, the general partner hereby certifies that the general partner _______________________________ (insert name), or responsible managing employee __________________________________ (insert name), is qualified for the license classification called for in these contract documents.

3. If a corporation, or any other combination or organization, the responsible managing officer _______________________________ (insert name), or a responsible managing employee ________________________________ (insert name), is qualified for the license classification called for in these contract documents.

If the individual who qualifies the Contractor for the license classification called for in these contract documents changes during the progress of the work, then Contractor shall, within seven (7) days of any such change, notify the Director of Public Works in writing of such change, including the name, license number and status of the individual.

For the purpose of this Certification, a responsible managing employee shall mean an individual who is a bona fide employee of the Contractor and is actively engaged in the classification of work for which that individual is the qualifying person on behalf of the Contractor under California law.

DATED:____________________ CONTRACTOR:___________________________________ SIGNATURE:_____________________________ TITLE:______________________________ ATTEST:

SIGNATURE BY:___________________________________________ TITLE:__________________________________________________ - END OF BIDDING DOCUMENTS –

4.a
Packet Pg. 50
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 1

CONTRACT DOCUMENTS

4.a
Packet Pg. 51
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 2

CITY OF EL CENTRO

EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT

CONSTRUCTION SERVICES AGREEMENT
This CONSTRUCTION SERVICES AGREEMENT (“Agreement”), is made and effective , by and between the City of El Centro, a municipal corporation ("CITY"), and , a ("CONTRACTOR"). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows:

I. SCOPE OF WORK
The CONTRACTOR shall perform within the time set forth in Article 2 of this Agreement and shall furnish all labor, materials, equipment, tools, utility services, and transportation and perform and complete all work required in connection with the following:

The work shall include grinding of existing asphalt concrete pavement, installation of asphalt-rubber and aggregate membrane, gap graded asphalt-rubber hot mix, conventionalasphalt concrete, minor aggregate base, monument preservation, utility cover adjustments and traffic control as described in Chapter 5 of the Caltrans Traffic Manual and the latest edition of Manual of Uniform Traffic Control Devices (“California MUTCD”).

By entering into this Agreement, CONTRACTOR acknowledges that there may be other contractors on the site whose work will be coordinated with that of its own.

CONTRACTOR expressly warrants and agrees that it will cooperate with other contractors and will do nothing to delay, hinder, or interfere with the work of other separate contractors, the CITY, the OWNER, the Architect, or utilities. CONTRACTOR also expressly agrees that, in the event its work is hindered, delayed, interfered with, or otherwise affected by a separate contractor, its sole remedy will be a direct action against the separate contractor.

To the extent allowed by law, the CONTRACTOR will have no remedy, and hereby expressly waives any remedy against the CITY, the OWNER, or the Architect on account of delay, hindrance, interference or other events caused by a separate contractor.

II. TIME FOR PROJECT COMPLETION
All of CONTRACTOR’s work on the Project shall be completed within durations established for the individual activities as set forth in the Project Construction Schedule.

All work shall commence ten (10) calendar days after receiving a written Notice to Proceed from the CITY or OWNER, if an OWNER is employed by CITY on the Project.

CONTRACTOR shall refer to the invitations for bids, and Project Plans and Specifications, all of which, as set forth below, are incorporated herein by reference, for contractual obligations regarding individual activity durations. The aggregate sum total work of all individual Prime Contractors to the CITY comprises the entire “Project” and shall be commenced and completed in conformance with the Project Construction Schedule. The entire Project shall be completed within 45 “Calendar” days as defined by Article 1 – Definitions of the General Conditions. However, final pavement installation must be

4.a
Packet Pg. 52
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 3 completed within two (2) calendar days after cold mill date. Cold mill and pavement operation schedule shall be coordinated to accomplish this.

III. THE CONTRACT SUM
The CITY shall pay to the CONTRACTOR for the performance of this Agreement, subject to any additions and deductions provided in the Project documents, the sum of dollars ($ ).

IV. PROGRESS PAYMENTS
Based upon Applications for Payment submitted to the Architect by the CONTRACTOR and Certificates for Payment issued by the Architect, the CITY shall make progress payments on account of the Contract Sum to the CONTRACTOR as provided in the General Conditions.

This Agreement is subject to the provisions of Article 1.7 (commencing at Section 20104.50) of Division 2, Part 3 of the Public Contract Code regarding prompt payment of contractors by local governments. Article 1.7 mandates certain procedures for the payment of undisputed and properly submitted payment requests within 30 days after receipt, for the review of payment requests, for notice to Contractor of improper payment requests, and provides for the payment of interest on progress payment requests that are not timely made in accordance with that Article. This AGREEMENT hereby incorporates the provisions of Article 1.7 as though fully set forth herein.

V. RETENTION OF SECURITIES
Public Contract Code Section 22300 permits the substitution of securities for any monies withheld by a public agency to ensure performance under a contract, at the request and expense of the CONTRACTOR.

VI. INDEMNITY, DEFENSE AND HOLD HARMLESS AGREEMENT
CONTRACTOR shall indemnify, defend with legal counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR's negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the CITY. Should conflict of interest principles preclude a single legal counsel from representing both CITY and CONTRACTOR, or should CITY otherwise find CONTRACTOR’s legal counsel unacceptable, then CONTRACTOR shall reimburse the CITY its costs of defense, including without limitation reasonable legal counsels fees, expert fees and all other costs and fees of litigation. The CONTRACTOR shall promptly pay any final judgment rendered against

4.a
Packet Pg. 53
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 4 the CITY (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the CONTRACTOR’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

CONTRACTOR obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of CITY under any provision of this agreement, CONTRACTOR shall not be required to indemnify and hold harmless CITY for liability attributable to the active negligence of CITY, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where CITY is shown to have been actively negligent and where CITY active negligence accounts for only a percentage of the liability involved, the obligation of CONTRACTOR will be for that entire portion or percentage of liability not attributable to the active negligence of CITY.

VII. PREVAILING WAGES
A. Wage rates for this Project shall be in accordance with the “General Wage Determination Made by the Director of Industrial Relations Pursuant To California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770, 1771, 1773, 1773.1, 1774 and 1815", for Imperial County. Wage rates shall conform to those posted at www.cityofelcentro.org under the RFP and Bids City website section for this project and the Project site.

B. The following Labor Code sections are hereby referenced and made a part of this Agreement:

1. Section 1775 - Penalty for Failure to Comply with Prevailing Wage Rates.

2. Section 1777.4 - Apprenticeship Requirements.

3. Section 1777.5 - Apprenticeship Requirements.

4. Section 1813 - Penalty for Failure to Pay Overtime.

5. Sections 1810 and 1811 - Working Hour Restrictions.

6. Section 1775 - Payroll Records.

7. Section 1773.8 - Travel and Subsistence Pay.

8. Section 1776 – Payroll Records
VIII. RECORD AUDIT
In accordance with Government Code Section 8546.7, records of both the CITY and the CONTRACTOR shall be subject to examination and audit by the Auditor General for a period of three (3) years after final payment.

4.a
Packet Pg. 54
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 5 IX. CERTIFICATIONS
A. Contractor shall have a Class A License.

X. FINAL PAYMENT
Final payment, constituting the entire unpaid balance of the Agreement Sum, shall be paid by the CITY to the CONTRACTOR no sooner than thirty-five (35) days after a Notice of Completion has been recorded, unless otherwise stipulated in the Notice of Completion, provided the work has then been completed, the Agreement fully performed, and a final Certificate for Payment has been issued by the Architect.

XI. CONTRACTOR'S FAILURE TO PROCURE COMPLETION OF PROJECT In the event CONTRACTOR fails to furnish tools, equipment, or labor in the necessary quantity or quality, or fails to prosecute the work or any part thereof contemplated by this Agreement in a diligent and workmanlike manner, and if the CONTRACTOR for a period of three (3) calendar days after receipt of written demand from CITY or its designated representative to do so, fails to furnish tools, equipment, or labor in the necessary quantity or quality, and to prosecute its work and all parts thereof in a diligent and workmanlike manner, or after commencing to do so within said three (3) calendar days, fails to continue to do so; then the CITY may exclude the CONTRACTOR from the premises, or any portion thereof, and take possession of said premises or any portion thereof, together with all material and equipment thereon, and may complete the work contemplated by this Agreement or any portion of said work, either by furnishing the tools, equipment, labor or material necessary, or by letting the unfinished portion of said work, or the portion taken over by the CITY to another contractor or by a combination of such methods. In any event, the procuring of the completion of said work, or the portion thereof taken over by the CITY, shall be a charge against the CONTRACTOR, and may be deducted from any money due or becoming due to CONTRACTOR from the CITY, or the CONTRACTOR shall pay the CITY the amount of said charge, or the portion thereof unsatisfied. The sureties provided for under this Agreement shall become liable for payment should CONTRACTOR fail to pay in full any said cost incurred by the CITY.

XII. INSURANCE
Prior to the beginning of and throughout the duration of the Work, CONTRACTOR and its subcontractors shall maintain insurance in conformance with the requirements set forth below. CONTRACTOR will use existing coverage to comply with these requirements. If that existing coverage does not meet the requirements set forth herein, CONTRACTOR agrees to amend, supplement or endorse the existing coverage to do so.

CONTRACTOR acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to CONTRACTOR or its subcontractors in excess of the limits and coverage identified in this Agreement and which is applicable to a given loss, claim or demand, will be equally available to CITY.

4.a
Packet Pg. 55
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 6 A. CONTRACTOR shall provide the following types and amounts of insurance:

Without limiting CONTRACTOR’s indemnification of CITY, and prior to commencement of Work, CONTRACTOR shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to CITY.

General liability insurance. CONTRACTOR shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $2,000,000 per occurrence, $4,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.

Automobile liability insurance. CONTRACTOR shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the CONTRACTOR arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.

Umbrella or excess liability insurance. CONTRACTOR shall obtain and maintain an umbrella or excess liability insurance that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability and employer’s liability. Such policy or policies shall include the following terms and conditions:
 A drop down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason;
 Pay on behalf of wording as opposed to reimbursement;  Concurrency of effective dates with primary policies;  Policies shall “follow form” to the underlying primary policies; and  Insureds under primary policies shall also be insureds under the umbrella or excess policies.

Workers’ compensation insurance. CONTRACTOR shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for CONTRACTOR’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, CONTRACTOR shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees.

4.a
Packet Pg. 56
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 7 CONTRACTOR shall submit to CITY, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of CITY, its officers, agents, employees and volunteers.

Pollution liability insurance. Environmental Impairment Liability Insurance shall be written on a CONTRACTOR’s Pollution Liability form or other form acceptable to CITY providing coverage for liability arising out of sudden, accidental and gradual pollution and remediation. The policy limit shall be no less than $1,000,000 dollars per claim and in the aggregate. All activities contemplated in this Agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for the hauling of waste from the project site to the final disposal location, including non-owned disposal sites.

Builder’s Risk: Upon commencement of construction and with approval of AGENCY, CONTRACTOR shall obtain and maintain builder’s risk insurance for the entire duration of the Project until only the AGENCY has an insurable interest. The Builder’s Risk coverage shall include the coverages as specified below.

The named insureds shall be CONTRACTOR and AGENCY, including its officers, officials, employees, and agents. All Subcontractors (excluding those solely responsible for design Work) of any tier and suppliers shall be included as additional insureds as their interests may appear. CONTRACTOR shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to AGENCY. The policy shall contain a provision that all proceeds from the builder’s risk policy shall be made payable to the AGENCY. The AGENCY will act as a fiduciary for all other interests in the Project.

Policy shall be provided for replacement value on an "all risk" basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, Nonconforming Work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site or any staging area. Such insurance shall be on a form acceptable to Agency to ensure adequacy of terms and sublimits and shall be submitted to the Agency prior to commencement of construction.

Products/completed operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured. Policy shall

4.a
Packet Pg. 57
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 8 contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The CITY, its officials, officers, agents, and employees, shall be included as insureds under the policy.

Other provisions or requirements
Proof of insurance. CONTRACTOR shall provide certificates of insurance to CITY as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by CITY’s risk manager prior to commencement of performance. Current certification of insurance shall be kept on file with CITY at all times during the term of this contract. CITY reserves the right to require complete, certified copies of all required insurance policies, at any time.

Duration of coverage. CONTRACTOR shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by CONTRACTOR, his agents, representatives, employees or subcontractors.

CONTRACTOR must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. CITY and its officers, officials, employees, and agents shall continue as additional insureds under such policies.

Primary/noncontributing. Coverage provided by CONTRACTOR shall be primary and any insurance or self-insurance procured or maintained by CITY shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of CITY before the CITY’s own insurance or self-insurance shall be called upon to protect it as a named insured.

City’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these requirements or is canceled and not replaced, CITY has the right but not the duty to obtain the insurance it deems necessary and any premium paid by CITY will be promptly reimbursed by CONTRACTOR or CITY will withhold amounts sufficient to pay premium from CONTRACTOR payments. In the alternative, CITY may cancel this Agreement.

Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the CITY’s risk manager.

4.a
Packet Pg. 58
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 9 Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow CONTRACTOR or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. CONTRACTOR hereby waives its own right of recovery against CITY, and shall require similar written express waivers and insurance clauses from each of its sub consultants.

Enforcement of contract provisions (non estoppel). CONTRACTOR acknowledges and agrees that any actual or alleged failure on the part of the CITY to inform CONTRACTOR of non-compliance with any requirement imposes no additional obligations on the CITY nor does it waive any rights hereunder.

Requirements not limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the CONTRACTOR maintains higher limits than the minimums shown above, the CITY requires and shall be entitled to coverage for the higher limits maintained by the CONTRACTOR. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the CITY.

Notice of cancellation. CONTRACTOR agrees to oblige its insurance agent or broker and insurers to provide to CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.

Additional insured status. General liability policies shall provide or be endorsed to provide that CITY and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies.

Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to CITY and approved of in writing.

Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that CONTRACTOR’s insurance shall apply separately to each insured against who claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.

Pass through clause. CONTRACTOR agrees to ensure that its sub-consultants, subcontractors, and any other party involved with the project that is brought onto or involved in the project by CONTRACTOR, provide the same minimum insurance

4.a
Packet Pg. 59
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 10 coverage and endorsements required of CONTRACTOR. CONTRACTOR agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. CONTRACTOR agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to CITY for review.

City’s right to revise requirements. The CITY reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the CONTRACTOR a ninety (90) day advance written notice of such change. If such change results in substantial additional cost to the CONTRACTOR, the CITY and CONTRACTOR may renegotiate CONTRACTOR’s compensation.

Self-insured retentions. Any self-insured retentions must be declared to and approved by CITY. CITY reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by CITY.

Timely notice of claims. CONTRACTOR shall give CITY prompt and timely notice of claims made or suits instituted that arise out of or result from CONTRACTOR’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.

Additional insurance. CONTRACTOR shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.

XIII. CONTRACTOR'S LICENSE
CONTRACTOR must possess at the time of commencing work and throughout the Project duration, a Contractor's License, issued by the State of California, which is current and in good standing. CONTRACTOR shall ensure that any subcontractor working on the Project possesses at the time of commencing work and throughout the Project duration, a Contractor's License, issued by the State of California, which is current and in good standing.

XIV. REGISTRATION REQUIREMENTS
Pursuant to Section 1771.1(a) of the Labor Code:
“A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work

4.a
Packet Pg. 60
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 11 pursuant to Section 1725.5 at the time the contract is awarded.” CONTRACTOR must be registered with the Department of Industrial Relations (DIR) of the State of California in order to be eligible to work on public works projects.

CONTRACTOR must ensure registration with the DIR that is active and in good standing.

No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

The CONTRACTOR is not subject to public works requirements (including registration with the DIR) if the public works project is under $1,000, unless the CITY knows that the same CONTRACTOR will be awarded total project costs in excess of $1,000 for a given year.

XV. CORPORATION IN GOOD STANDING
If CONTRACTOR is a corporation, the undersigned hereby represents and warrants that the corporation is duly incorporated and in good standing in the State of California, and that , whose title is , is authorized to act for and bind the corporation.

XVI. PROVISIONS REQUIRED BY LAW
Each and every provision of law and clause required by law to be inserted in this Agreement shall be deemed to be inserted herein and the Agreement shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not currently inserted, then upon application of either party the Agreement shall forthwith be physically amended to make such insertion or correction.

XVII. SUBSURFACE HAZARDOUS MATERIALS
A. In the event trenches or other excavations extend deeper than four (4) feet below the surface, the CONTRACTOR shall promptly, and before the following conditions are disturbed, notify the CITY in writing of any:

1. Material that the CONTRACTOR believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code

4.a
Packet Pg. 61
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 12 that is required to be removed to a Class I, Class II or Class III disposal site in accordance with the provisions of existing law.

2. Subsurface or latent physical conditions at the site differing from those indicated.

3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in the Work or the character provided for in the CONTRACT.

B. Upon receipt of said notification the CITY will investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the CONTRACTOR's cost of or the time required for performance of any part of the work, the CITY will issue a change order under the procedures described in the General Conditions.

C. In the event that a dispute arises between the CITY and the CONTRACTOR whether the conditions materially differ, or involve hazardous waste or cause a decrease or increase in the CONTRACTOR's cost of or time required for performance of any part of the work, the CONTRACTOR shall not be excused from any scheduled completion date provided for by the Agreement, but shall proceed with all work to be performed under the Agreement. The CONTRACTOR shall retain any and all rights provided either by Agreement or by law which pertain to the resolution of disputes and protests between the contracting parties.

XVIII. LIQUIDATED DAMAGES
Pursuant to Government Code Section 53069.85, if work is not completed within the contract time or in strict accordance with the Project Schedule, it is understood, acknowledged and agreed that the CITY will suffer damage. It is therefore agreed that the CONTRACTOR shall pay to the CITY the sum of two thousand dollars ($2,000) for each and every calendar day of delay beyond the Contract Time, or beyond any completion schedule, construction schedule or Project milestones established in or pursuant to the Project Schedule, or beyond the time indicated in the Project Schedule for any individual Contract activity.

CONTRACTOR expressly understands, acknowledges and agrees that such liquidated damages can and shall be imposed if the CONTRACTOR does not meet each and every aspect of any activity schedule, completion schedule, construction schedule or Project milestones established in or pursuant to the Project Schedule. If the CITY accepts work or makes any payment under this Agreement after a default by reason of delays, the acceptance of such work and/or payment(s) shall in no respect constitute a waiver or modification of any provisions regarding Contract Time, a completion schedule, the Project Schedule or the accrual of liquidated damages. In the event the same is not paid, the CONTRACTOR further agrees that the CITY may deduct the amount thereof from any money due or that may become due the CONTRACTOR under the Agreement. This Article does not exclude recovery of damages under provisions of the Contract Documents, and is expressly in addition to the CITY’s ability to seek other damages.

4.a
Packet Pg. 62
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 13 CONTRACTOR is to refer to Section Project Construction Schedule for duration of individual activities. Liquidated damages may be assessed if any individual activity duration exceeds the time indicated for that activity on the Project Construction Schedule.

XIX. COMPONENT PARTS OF THE CONTRACT
This Agreement entered into consists of the following CONTRACT DOCUMENTS, all of which are component parts of the Agreement as if herein set out in full or attached hereto:

Notice Inviting Bids Proposed Subcontractors
Scope of Summary Bid Bond
Information for Bidders Information Required of Bidder
Bid Form Contract
Non-Collusion Affidavit Certificate Re. Worker’s Compensation Site Visit Certification Drug-free Workplace Certification Faithful Performance Bond Plans and Specifications
Labor and Materials Payment Bond Addenda
General Conditions Drawings
Supplementary General Conditions Change Orders
Special Conditions Shop Drawings Transmittals

All of the above named CONTRACT DOCUMENTS are intended to be complementary.

Work required by one of the above named CONTRACT DOCUMENTS and not by others shall be done as if required by all.

XX. ENTIRE CONTRACT
This Agreement constitutes the entire contract of the parties. No other agreements or contracts, whether oral or written, pertaining to the work to be performed, exist between the parties. This Agreement can be modified only by an amendment in writing, signed by both parties.

CONTRACTOR CITY
City of El Centro
By: ____________________________ By: ____________________________ Title: __________________________ Title: __________________________ Date: __________________________ Date: __________________________

4.a
Packet Pg. 63
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 14 ATTACHMENTS:

Non-collusion Affidavit
Faithful Performance Bond
Labor and Materials Bond

4.a
Packet Pg. 64
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 15

PERFORMANCE BOND
Whereas, The City Council of the City of El Centro, State of California, and _________________________________ (hereinafter designated as “principal”) have entered into an agreement whereby principal agrees to install and complete certain designated public improvements, which said agreement, dated __________, 20__, and identified as project _______________________________________________, is hereby referred to and made a part hereof; and
Whereas, Said principal is required under the terms of said agreement to furnish a bond for the faithful performance of said agreement.

Now, therefore, we, the principal and _____________________________________, as surety, are held and firmly bound unto the City of El Centro (hereinafter designated as “El Centro”) in the penal sum of ____________________ dollars ($__________) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.

The condition of this obligation is such that if the above-bounded principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the said agreement and any alteration thereof made as therein provided, on his or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless El Centro, its officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney’s fees, incurred by El Centro in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the specifications accompanying the same shall in anywise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.

4.a
Packet Pg. 65
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 16 In Witness Whereof, this instrument has been duly executed by the principal and surety above named, on ______________________, 20__.
(SEAL) (SEAL)

(CONTRACTOR) (Surety)
By: By:
(Signature) (Signature)
- END OF PERFORMANCE BOND –

4.a
Packet Pg. 66
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 17

PAYMENT BOND

PAYMENT BOND
Whereas, the City Council of the City of El Centro, State of California, and ________________________ (hereinafter designated as ''the Principal") have entered into an Agreement dated _________________ and described as
________________________________________________________________ _______________________________________________________________ whereby the Principal agrees to install and complete certain designated public improvements identified as _________________________which are part of City project ________________________________________________, and which Agreement is hereby referred to and made a part hereof; and
Whereas, under the terms of the Agreement, the Principal is required before entering upon the performance of the work to file a good and sufficient payment bond with the City of El Centro to secure the claims referenced in Civil Code Sections 9550 et seq.; and Now, therefore, the Principal and the undersigned as corporate surety, are held firmly bound unto the City of El Centro and all contractors, subcontractors, laborers, materialmen, and other persons employed in the performance of the Agreement and referenced in Sections 9550 et seq of the Civil Code in the sum of
_________________________________________dollars ($________________), for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to this work or labor, that the surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by the City of El Centro in successfully enforcing this obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Section 9550 et seq of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension, alteration, or addition.

4.a
Packet Pg. 67
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT CD 18 In witness whereof, this instrument has been duly executed by the principal and surety above named, on___________, 20 _______________________________ _________________________ (CONTRACTOR) (Surety)
By:___________________________ By:_______________________________ (Signature) (Signature)
-END OF PAYMENT BOND-
- END OF CONTRACT DOCUMENTS -

4.a
Packet Pg. 68
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 1

GENERAL CONDITIONS

4.a
Packet Pg. 69
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 2

GENERAL CONDITIONS
ARTICLE 1 -- DEFINITIONS
Wherever used in these General Conditions or in the other Contract Documents the following terms have the meanings indicated which are applicable to both the singular and plural thereof.

Where an entire word is capitalized in the definitions and is found un-capitalized in the Contract Documents it has the ordinary dictionary definition.

Addenda - Written or graphic instruments issued prior to the opening of Bids which make additions, deletions or revisions to the Contract Documents.

Agent - OWNER is the Agent of OWNER.

Agreement - The written contract between OWNER and CONTRACTOR covering the WORK to be performed; other documents are attached to the Agreement and made a part thereof as provided therein.

Allowance - A Bid item that adds a specified quantity of WORK to the Agreement work scope which OWNER may unilaterally direct CONTRACTOR to perform, or elect not to have performed.

Application for Payment - The form furnished by OWNER which is to be used by CONTRACTOR to request progress or Final Payment and which is to be accompanied by such supporting documentation as is required by the Contract Documents.

Asbestos - Any material that contains more than one (1) percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration (“OSHA”).

Beneficial Occupancy - Use by OWNER of the WORK prior to final acceptance.

Bidder - Any individual, firm, partnership, corporation or combination thereof, submitting a Bid for the WORK, acting directly or through a duly authorized representative.

Bid - The offer or proposal of the Bidder submitted on the prescribed form setting forth the price or prices for the WORK.

Bidding Documents - The advertisement or Invitation to Bid, Instructions to Bidders, the Bid form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids).

Bonds - Bid, Performance and Payment Bonds and other instruments which protect against loss due to inability or refusal of CONTRACTOR to perform its contract.

4.a
Packet Pg. 70
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 3 Change Order - A document recommended by OWNER which is signed by CONTRACTOR and OWNER and authorizes an addition, deletion or revision in the WORK, or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement.

CITY - OWNER (See OWNER’s in this section).

City of El Centro - OWNER (See OWNER’s definition in this section).

Claim - A dispute becomes a Claim only after CONTRACTOR receives and refuses to accept OWNER’s initial determination, and is certified as required by Article 16.3.

Codes - The terms Government Code, Labor Code, etc. refer to codes of the State of California.

OWNER - The individual, partnership, corporation, joint venture or other legal entity named as such by written notice from OWNER.

OWNER Order - A written order issued by OWNER which clarifies or interprets the Procurement Documents or orders minor changes or alterations in the scope of WORK to be furnished but which does not involve a change in the Contract Price or the Contract Time.

Contract Documents - The Notice Inviting Bids, Instructions to Bidders, Bid forms (including the Bid, Bid schedule(s), information required of Bidder, Bid bond, and all required certificates and affidavits), Agreement, Performance Bond, Payment Bond, General Conditions, Supplementary General Conditions, SPECIAL PROVISIONS, Drawings and all Addenda, and Change Orders executed pursuant to the provisions of the Contract Documents.

Contract Milestone - A principal event specified in the Contract Documents relating to an intermediate completion date of a portion of the WORK, or a period of time within which the portion of the WORK should be performed prior to Substantial Completion of all the WORK.

Contract Price - The total monies payable by OWNER to CONTRACTOR under the terms and conditions of the Contract Documents.

Contract Time - The number of successive calendar Days stated in the Contract Documents for the completion of the WORK.

CONTRACTOR - The individual, partnership, corporation, joint venture or other legal entity with whom OWNER has executed the Agreement.

Day - A calendar day of twenty-four (24) hours measured from midnight to the next midnight.

Defective Work - Work that is unsatisfactory, faulty or deficient; or that does not conform to the Contract Documents; or that does not meet the requirements of any inspection, reference standard, test or approval referred to in the Contract Documents; or work that has been damaged by anyone other than OWNER prior to OWNER’s recommendation of final payment.

4.a
Packet Pg. 71
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 4 OWNER - The individual, partnership, corporation, joint venture or other legal entity named as such in the Contract Documents or succeeding entity. In the lack thereof, OWNER shall have the same meaning as OWNER.

Demobilization - The complete dismantling and removal by CONTRACTOR of all of CONTRACTOR’s temporary facilities, equipment and personnel at the site.

Drawings - The drawings, plans, maps, profiles, diagrams and other graphic representations which indicate the character, location, nature, extent and scope of the WORK and which have been prepared by OWNER and are referred to in the Contract Documents. Shop Drawings are not Drawings as so defined.

Disputed Work - A dispute exists from the time CONTRACTOR disagrees with a decision or determination made by OWNER until OWNER renders an initial determination. If the issue is unresolved it becomes a Claim.

Effective Date of the Agreement - The date indicated in the Agreement on which it becomes effective, but if no such date is indicated it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver.

Engineer - Wherever the word Engineer is found in these Contract Documents or in any referenced document, it shall mean OWNER.

Field Order - A written order issued by OWNER which changes the Agreement WORK scope and involves a change in the Contract Price or Contract Time or the intent of the Agreement.

Final Payment - is defined as the last progress payment made to CONTRACTOR for earned funds, less retainage as applicable, less deductions listed in Article 14. CONTRACTOR is entitled to this payment when the Notice of Completion is issued.

General Conditions - Section General Conditions of the Contract Specification.

Hazardous Waste - The term Hazardous Waste shall have the meaning provided in Section 104 of the Solid Waste Disposal Act (42 USC Section 6903) as amended from time to time or, as defined in section 25117 of the Health and Safety Code, that is required to be removed to a class I, class II or class III disposal site in accordance with provisions of existing law, whichever is more restrictive.

Holidays - Legal Holidays observed by OWNER occur on:

New Year’s Day - January 1
Martin Luther King’s Birthday - Third (3rd) Monday in January President’s Day - Third (3rd) Monday in February
Good Friday – The afternoon of the Friday before Easter Memorial Day - Last Monday in May
Juneteenth – June 19

4.a
Packet Pg. 72
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 5 Independence Day - July 4
Labor Day - First (1st) Monday in September
Veteran’s Day - November 11
Thanksgiving Day - Fourth (4th) Thursday in November
The Day after Thanksgiving – The Friday after the fourth (4th) Thursday in November Christmas Eve – The afternoon of December 24
Christmas Day - December 25
New Year’s Eve – The afternoon of December 31
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday are both legal Holidays. If the Holiday should fall on a Sunday, Sunday and the following Monday are both legal Holidays.

Interfacing Work - Work which connects to, abuts or meets with work of another contractor.

Laws and Regulations - Any and all applicable laws, rules, regulations, ordinances, codes and/or orders of any and all governmental bodies, agencies, authorities and courts having jurisdiction.

Lump Sum Work - Work to be paid on the basis of lump sum prices.

Mechanic’s Lien - A form of security, an interest in real property, which is held to secure the payment of an obligation. When referred to in these Contract Documents, Mechanic’s Lien or lien means Stop Notice.

Milestone - See Contract Milestone.

Mobilization - The establishment by CONTRACTOR of the temporary facilities, equipment and personnel at the site thereby enabling the WORK to commence.

Notice of Award - The written notice by OWNER to the apparent low Bidder stating that upon compliance by the apparent low Bidder with the conditions precedent enumerated therein within the time specified, OWNER will enter into an Agreement.

Notice of Completion - A form signed by OWNER, OWNER and CONTRACTOR recommending to OWNER that the WORK is complete and fixing the date of completion. After acceptance of the WORK by OWNER’s governing body, the form is signed by OWNER and filed with the County Recorder. This filing starts the thirty (30) Day lien filing period on the WORK.

Notice to Proceed - The written notice issued by OWNER to CONTRACTOR authorizing CONTRACTOR to proceed with the WORK and establishing the date of commencement of the Contract Time.

OWNER’s Agent - OWNER is OWNER’s Agent.

OWNER - The City of El Centro, acting through its legally designated officials, officers or employees.

4.a
Packet Pg. 73
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 6 Partial Utilization - Use by OWNER of a substantially completed part of the WORK for the purpose for which it is intended prior to Substantial Completion of all the WORK. (See Beneficial Occupancy)
PCBs - Polychlorinated biphenyls.

Petroleum - Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (sixty (60) degrees Fahrenheit and fourteen and seventenths (14.7) pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene and oil mixed with other non-Hazardous Wastes and crude oils.

Project - The total construction of which the WORK to be provided under the Contract Documents may be the whole, or a part as indicated elsewhere in the Contract Documents.

Radioactive Material - Source, special nuclear or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Sections 2011 et seq.) as amended from time to time.

Request for Information - The standardized form furnished by OWNER for CONTRACTOR’s use when making written requests for information to OWNER, and upon which the response will be answered and returned.

Request for Proposal - The standardized form used by OWNER to request a proposal from CONTRACTOR for proposed changes in the WORK.

Samples - Physical examples of materials, equipment or workmanship that are representative of some portion of the WORK and which establish the standards by which such portion of the WORK will be judged.

Safety - Safety includes health and security.

Shop Drawings - All drawings, diagrams, illustrations, schedules and other data which are specifically prepared by or for CONTRACTOR and submitted by CONTRACTOR to illustrate some portion of WORK and all illustrations, brochures, standard schedules, performance charts, instructions and diagrams to illustrate material or equipment for some portion of the WORK.

Specifications – The directions, provisions and requirements contained in the Bidding Documents, contract forms, conditions of the Agreement and the SPECIAL PROVISIONS, as listed in the Table of Contents.

Stop Notice - A legal remedy for Subcontractors and Suppliers who contribute to public works, but who are not paid for their work, which secures payment from construction funds possessed by OWNER. For public property, the Stop Notice remedy is designed to substitute for Mechanic’s Lien rights.

4.a
Packet Pg. 74
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 7 Submittals - The information which is specified for submission to OWNER in accordance with Article 6.20 of the General Conditions.

Sub-Consultant - The individual, partnership, corporation, joint venture or other legal entity having a direct contract with OWNER, OWNER or with any of their consultants to furnish services with respect to the Project and who is identified as such in the Supplementary General Conditions.

Subcontractor - An individual, partnership, corporation, joint venture or other legal entity having a direct contract with CONTRACTOR or with any other Subcontractor for the performance of a part of the WORK at the site.

Substantial Completion - Refers to when the WORK has progressed to the point where, in the opinion of OWNER as evidenced by Notice of Completion as applicable, it is sufficiently complete, in accordance with the Contract Documents, so that the WORK can be utilized for the purposes for which it is intended, and after the operation demonstration is complete, where applicable.

SPECIAL PROVISIONS – That section of the Contract Documents consisting of written technical descriptions of products and execution of the WORK.

Supplementary General Conditions - The part of the Contract Documents which make additions, deletions or revisions to these General Conditions.

Supplier - A manufacturer, fabricator, supplier, distributor, material worker or vendor.

Underground Utilities - All pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments, and any encasement containing such facilities which have been installed underground to furnish any of the following services or materials: electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems or water.

Unit Price Work - Specific WORK scope included in the Agreement WORK scope to be paid for on the basis of unit prices. OWNER may unilaterally direct CONTRACTOR to perform the WORK, or elect not to have the WORK performed.

WORK - The entire completed construction or the various separately identifiable parts thereof required to be furnished under the Contract Documents. WORK is the result of performing or furnishing labor and furnishing and incorporating materials and equipment into the construction, and performing or furnishing services and furnishing documents, all as required by the Contract Documents.

Work Change Directive - A written directive to CONTRACTOR, issued on or after the Effective Date of the Agreement and recommended by OWNER, and signed by OWNER ordering an addition, deletion or revision in the WORK, or responding to differing or unforeseen physical conditions under which the WORK is to be performed or to emergencies. A Work Change

4.a
Packet Pg. 75
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 8 Directive will not change the Contract Price or the Contract Time, but is evidence that the parties expect that the change directed or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Time.

ARTICLE 2 -- PRELIMINARY MATTERS

2.1 DELIVERY OF BONDS/INSURANCE CERTIFICATES - When CONTRACTOR delivers the signed Agreements to OWNER, CONTRACTOR shall also deliver to OWNER such Bonds and Insurance Policies and Certificates as CONTRACTOR may be required to furnish in accordance with the Contract Documents.

2.2 COPIES OF DOCUMENTS - OWNER shall furnish to CONTRACTOR ten (10) copies of the Contract Documents as specified in the Agreement and ten (10) sets of full-scale Drawings.

Additional quantities of the Contract Documents will be furnished at reproduction cost.

2.3 COMMENCEMENT OF CONTRACT TIME; NOTICE TO PROCEED - The Contract Time will start to run on the commencement date stated in the Notice to Proceed.

2.4 STARTING THE WORK - CONTRACTOR shall begin to perform the WORK within ten (10) Days after the commencement date stated in the Notice to Proceed, but no work shall be done at the site prior to said commencement date. In addition, any requirements in the Supplemental General Conditions must be satisfied.

2.5 CONTRACTOR MUST STUDY CONTRACT DOCUMENTS - Before undertaking each part of the WORK, CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements.

CONTRACTOR shall promptly report in writing to OWNER any conflict, error or discrepancy which CONTRACTOR may discover and shall obtain a written interpretation or clarification from OWNER before proceeding with any work affected thereby.

2.6 PRELIMINARY SUBMITTALS - Preliminary submittals shall be provided to OWNER in accordance with Division 1 requirements.

2.7 PRECONSTRUCTION CONFERENCE - CONTRACTOR is required to attend a preconstruction conference. This conference will be attended by OWNER and others as appropriate in order to discuss the WORK in accordance with the applicable procedures specified in the General Requirements.

CONTRACTOR is required to schedule and attend a preconstruction conference with the Imperial Irrigation District (“IID”) prior to the construction or demolition of any electrical improvements.

2.8 SUBCONTRACTOR MOBILIZATION MEETING - Prior to the start of each major Subcontractor’s site work, CONTRACTOR, the involved Subcontractor and OWNER shall attend a pre-start meeting to discuss the schedule, coordination, procedures and other administrative issues.

4.a
Packet Pg. 76
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 9

2.9 CONTRACTOR DUTY TO ADVISE OWNER OF KNOWN OR DISCOVERED PROBLEMS - CONTRACTOR is reminded of his obligation to advise OWNER of any errors and/or omissions in the Contract Documents, or changes to thereof, which CONTRACTOR may be aware through special knowledge or discovered during the Bid process.

ARTICLE 3 -- CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE

3.1 INTENT - The Contract Documents comprise the entire agreement between OWNER and CONTRACTOR concerning the WORK. The Contract Documents are complementary; what is called for by one is as binding as if called for by all. The Contract Documents will be construed in accordance with the law of the place of the WORK.

3.2 INTENT OF WORK TO BE FUNCTIONALLY COMPLETE

3.2.1 Work to be Complete - It is the intent of the Contract Documents to describe the WORK to be constructed in accordance with the Contract Documents. Any work, materials or equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the intended result shall be supplied whether or not specifically called for or identified in the Contract Documents. When words or phrases which have a wellknown technical or construction industry or trade meaning are used to describe work, materials or equipment, such words or phrases shall be interpreted in accordance with that meaning unless a definition has been provided in Article 1 of the General Conditions.

3.2.2 Necessary Utilities - If utilities to equipment/fixtures are not shown but are necessary to operate the equipment/fixtures, the utilities service installation is considered to be part of the WORK. The implied WORK will conform to the appropriate sections of the technical Specifications.

3.3 CLARIFICATIONS AND INTERPRETATIONS OF THE CONTRACT DOCUMENTS

3.3.1 Referenced Standards - Reference to standard specifications, manuals or Codes of any technical society, organization or association or to the laws or regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code or laws or regulations in effect at the time of opening of Bids, except as may be otherwise specifically stated. However, no provision of any referenced standard specification, manual or code shall be effective to change the duties and responsibilities of OWNER, CONTRACTOR or OWNER or any of their consultants, agents or employees from those set forth in the Contract Documents.

3.3.2 Discovery of Problem Notice - If, during the performance of the WORK, CONTRACTOR discovers any conflict, error, ambiguity or discrepancy with the WORK within the Contract Documents or between the Contract Documents and any provision of any such Laws and Regulations applicable to the performance of the WORK or of any such standard, specification, manual or code or of any instruction of any Supplier, CONTRACTOR shall report it to OWNER in writing within seven (7) calendar Days of discovery. CONTRACTOR shall not proceed with

4.a
Packet Pg. 77
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 10 the WORK affected thereby, except in an emergency, unless directed by OWNER. Any WORK performed by CONTRACTOR that is not directed by OWNER shall be at its own risk.

3.3.3 Order of Precedence of Contract Documents - In resolving conflicts resulting from errors or discrepancies in any of the Contract Documents, the order of precedence shall be as follows:

3.3.3.1 Permits from other agencies as may be required by law.

3.3.3.2 Change Orders

3.3.3.3 Agreement

3.3.3.4 Addenda

3.3.3.5 CONTRACTOR’s Bid (Bid Form)

3.3.3.6 Notice Inviting Bids

3.3.3.7 Instructions to Bidders

3.3.3.8 Supplementary General Conditions

3.3.3.9 General Conditions

3.3.3.10 SPECIAL PROVISIONS

3.3.3.11 Drawings

3.3.3.12 Referenced Standard Specifications

3.3.4 Order of Precedence of the Drawings - With reference to the Drawings the order of precedence is as follows:

3.3.4.1 Figures govern over scaled dimensions

3.3.4.2 Detail drawings govern over general drawings

3.3.4.3 Addenda/Change Order drawings govern over Contract Drawings

3.3.4.4 Contract Drawings govern over standard drawings

3.4 AMENDING AND SUPPLEMENTING CONTRACT DOCUMENTS

3.4.1 Amending Contract Documents - The Contract Documents may be amended to provide for additions, deletions and revisions in the WORK or to modify the terms and conditions thereof by a Change Order pursuant to Article 10.

4.a
Packet Pg. 78
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 11

3.4.2 Supplementing Contract Documents - The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the WORK may be authorized, by:

3.4.2.1 - A OWNER Order issued by OWNER.

3.4.2.2 - OWNER’s approval of a Shop Drawing or Sample pursuant to Article 6

3.4.2.3 - OWNER’s written interpretation or clarification

3.5 REUSE OF DOCUMENTS - Neither CONTRACTOR, nor any Subcontractor or Supplier, nor any other person or organization performing any of the WORK under a contract with OWNER shall have or acquire any title to or ownership rights in any of the Drawings, technical Specifications or other documents used on the WORK, and they shall not reuse any of them on the extensions of the Project or any other project without written consent of OWNER.

ARTICLE 4 -- AVAILABILITY OF LANDS; PHYSICAL CONDITIONS; REFERENCE POINTS

4.1 AVAILABILITY OF LANDS - OWNER shall furnish, as indicated in the Contract Documents, the lands upon which the WORK is to be performed, rights-of-way and easements for access thereto, and such other lands which are designated for the use of CONTRACTOR.

Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by OWNER, unless otherwise provided in the Contract Documents. Nothing contained in the Contract Documents shall be interpreted as giving CONTRACTOR exclusive occupancy of the lands or rights-of-way provided. CONTRACTOR shall provide, at no additional cost, for all additional lands and access thereto that may be required for temporary construction facilities, borrow areas, waste disposal areas or storage of materials and equipment; provided that CONTRACTOR shall not enter upon nor use any property not under the control of OWNER until a written temporary construction easement agreement has been executed by CONTRACTOR and the property owner, and a copy of said easement furnished to OWNER prior to said use; and, neither OWNER nor OWNER shall be liable for any claims or damages resulting from CONTRACTOR’s unauthorized trespass or authorized use of any such properties.

4.2 PHYSICAL SITE CONDITIONS

4.2.1 Reports and Drawings - Reference is made to the Supplementary General Conditions for identification of:

4.2.1.1 Subsurface Condition Reports - Those reports of explorations and tests of subsurface conditions at or contiguous to the site that have been utilized by OWNER in preparing the Contract Documents; and

4.2.1.2 Drawings of Existing Structures - Reference is made to the Supplementary General Conditions for identification of those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Utilities referred to in section 4.4 of Article

4.a
Packet Pg. 79
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 12 4 herein) which are at or contiguous to the site that have been utilized in the preparation of the Contract Documents.

4.2.2 Limited Reliance By CONTRACTOR On The Technical Data - CONTRACTOR may rely upon the accuracy of the technical data contained in such drawings or reports, however, nontechnical data, interpretations and opinions contained in such drawings or reports are not to be relied on by CONTRACTOR. CONTRACTOR may not rely upon or make any claims against OWNER, OWNER or OWNER with respect to:

4.2.2.1 the completeness of such reports and drawings for CONTRACTOR’s purposes, including, but not limited to, any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and Safety precautions and programs incident thereto, or

4.2.2.2 other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings, or

4.2.2.3 any CONTRACTOR interpretation of or conclusion drawn from any technical data or any such data, interpretations, opinions or information.

4.3 DIFFERING SITE CONDITIONS - If CONTRACTOR believes that any subsurface or physical condition at or contiguous to the site that is uncovered or revealed either:

4.3.1 is of such a nature as to establish that any technical data on which CONTRACTOR is entitled to rely as provided in paragraphs 4.2.1 is materially inaccurate, or

4.3.2 is of such a nature as to require a change in the Contract Documents, or

4.3.3 differs materially from that shown or indicated in the Contract Documents, or

4.3.4 is of an unusual nature and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents, CONTRACTOR shall immediately report it to OWNER then CONTRACTOR shall, promptly after becoming aware thereof and before further disturbing conditions thereby or performing any work in connection therewith (except in an emergency as permitted by paragraph 6.23), notify OWNER and OWNER in writing about such condition. CONTRACTOR shall not further disturb such conditions or perform any work in connection therewith (except as aforesaid) until receipt of written order to do so.

4.3.5 OWNER Responsibility - OWNER shall promptly investigate the conditions, and if it finds that the conditions do materially so differ and cause a decrease or increase in CONTRACTOR’s cost of, or the time required for, performance of any part of the WORK, OWNER shall issue a Change Order under the procedures described in Article 10. If OWNER determines that there is no bona fide work scope change or is a minor change which does not impact time or cost, OWNER shall notify CONTRACTOR of this finding within thirty (30) Days.

4.a
Packet Pg. 80
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 13

4.3.6 Disputed Work – If CONTRACTOR and OWNER are unable to reach agreement on Disputed Work, OWNER may direct CONTRACTOR to proceed with the WORK. Payment shall be as later directed by mediation or arbitration, if OWNER and CONTRACTOR agree thereto, or as fixed in a court of law.

Although not to be construed as proceeding under extra work provisions, CONTRACTOR shall keep and furnish records of Disputed Work in accordance with 11.3.

4.3.7 Disallowance of Entitlement - CONTRACTOR shall not be entitled to any adjustment in the Contract Price or Contract Time or will be deemed to have waived his right to such a claim if:

4.3.7.1 CONTRACTOR knew of the existence of such conditions at the time CONTRACTOR made a final commitment to OWNER in respect of Contract Price and Contract Time by the submission of a Bid or becoming bound under the Agreement; or

4.3.7.2 the existence of such condition could reasonably have been discovered or revealed as a result of any examination, investigation of the site and contiguous areas suggested or required by the Bidding Documents: or

4.3.7.3 CONTRACTOR failed to give the written notice within the time and as required by Article

3.3.2. 4.4 UNDERGROUND UTILITIES

4.4.1 Utilities Indicated - The information and data indicated in the Contract Documents with respect to existing Underground Utilities at or contiguous to the site are based on information and data furnished to OWNER or OWNER by the owners of such Underground Utilities or by others.

Unless it is expressly provided in the Supplementary General Conditions and/or the General Conditions, OWNER and OWNER shall not be responsible for the accuracy or completeness of any such information or data, and CONTRACTOR shall have full responsibility for reviewing and checking all such information and data, for locating all Underground Utilities indicated in the Contract Documents, for coordination of the WORK with the owners of such Underground Utilities during construction, for the Safety and protection thereof and repairing any damage thereto resulting from the WORK, the cost of which will be considered as having been included in the Contract Price.

4.4.2 Utilities Not Indicated - If Underground Utilities are uncovered or revealed at or contiguous to the site which was not indicated in the Contract Documents and which CONTRACTOR could not reasonably have been expected to be aware of, CONTRACTOR shall identify the owner of such Underground Utilities and give written notice thereof to that owner and shall notify OWNER in accordance with the requirements of the General Conditions and General Requirements.

4.4.3 Action Prior To Starting Work - As provided in section 4216 of the California Government Code, at least two (2) working Days prior to commencing any excavation, CONTRACTOR shall contact the regional notification center (Underground Service Alert of Southern California) and obtain an inquiry identification number.

4.a
Packet Pg. 81
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 14

4.4.4 Locate Utilities - CONTRACTOR shall determine the location and depth of all utilities, including service connections, which have been marked by the respective owners and which may affect or be affected by its operations. Full compensation for such work shall be considered as included in CONTRACTOR’s Bid price.

4.4.5 Protection Of Utilities - CONTRACTOR shall not interrupt the service function or disturb the support of any utility, without authority from OWNER or order from the utility owner. All valves, switches, vaults and meters shall be maintained readily accessible for emergency shutoff.

Where protection is required to ensure support of utilities located as shown on the Plans, CONTRACTOR shall, unless otherwise provided, furnish and place the necessary protection at its expense.

4.4.6 Notification Requirements If Utility Disturbed - CONTRACTOR shall immediately notify OWNER and utility owner if any utility is disturbed or damaged. CONTRACTOR shall bear the costs of repair or replacement of any utility damaged by CONTRACTOR.

4.4.7 Removal Of Abandoned Utilities - Unless otherwise specified, CONTRACTOR shall remove all interfering portions of utilities shown on the Plans or indicated in the Bidding Documents as abandoned. Before starting removal operations, CONTRACTOR shall ascertain from the Utility Owner whether the abandonment is complete. The costs involved in the removal and disposal shall be included in the price for the item of work necessitating such removals.

4.4.8 Relocation Of Utilities

4.4.8.1 When the Plans or Specifications provide for CONTRACTOR to alter, relocate or reconstruct a utility, all costs for such work shall be included in the Bid.

4.4.8.2 Temporary or permanent relocation or alteration of indicated utilities requested by CONTRACTOR for its convenience shall be its responsibility, and CONTRACTOR shall make all arrangements and bear all costs.

4.4.8.3 After award of the Agreement, portions of utilities not indicated in the Contract Documents which are found to interfere with the WORK may be relocated, altered or reconstructed by the utility owner, or OWNER may order changes in the WORK to avoid interference. Such changes will be paid for in accordance with Article 10.

4.4.9 Delays

4.4.9.1 CONTRACTOR shall immediately notify in writing the utility owner and OWNER of its construction schedule and any subsequent changes in the construction schedule which will affect the time available for protection, removal or relocation of utilities.

4.4.9.2 CONTRACTOR will not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if correctly located, as noted in the Contract Documents.

4.a
Packet Pg. 82
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 15

4.4.9.3 CONTRACTOR may be given a no cost extension of time for unforeseen delays attributable to unreasonably protracted interferences by others in the relocation of utilities.

4.4.10 Access to the WORK - When necessary, CONTRACTOR shall so conduct its operations as to permit access to the WORK site and provide time for utility work to be accomplished during normal work hours during the progress of the WORK.

4.5 REFERENCE POINTS

4.5.1 Bench Mark - The CONSTRUCTION MANAGER will provide one (1) benchmark, near or on the site of the WORK, and will provide two (2) points near or on the site to establish a base line for use by CONTRACTOR for alignment control. Unless otherwise specified in the General Requirements, CONTRACTOR shall furnish all other lines, grades and benchmarks required for proper execution of the WORK.

4.5.2 Protection of Bench Marks - CONTRACTOR shall preserve all bench marks, stakes and other survey marks, and in case of their removal or destruction by any party, CONTRACTOR shall be responsible for the accurate replacement of such reference points by personnel qualified under Division 3, Chapter 15 of the California Business and Professions Code. CONTRACTOR shall report to OWNER whenever a reference point is lost, destroyed or requires relocation.

4.6 ASBESTOS, PCBS, PETROLEUM, HAZARDOUS WASTE OR RADIOACTIVE

MATERIAL

4.6.1 OWNER Responsibility - OWNER shall be responsible for any hazardous material which includes hazardous substances and hazardous waste as defined by sections 25316 and 25117 of the Health and Safety Code, uncovered or revealed at the site which was not identified in the Contract Documents to be within the scope of the WORK. OWNER shall not be responsible for any such materials brought to the site by CONTRACTOR, Subcontractors, Suppliers or anyone else for whom CONTRACTOR is responsible.

4.6.2 CONTRACTOR’s Responsibility - When such hazardous material is encountered, CONTRACTOR shall immediately stop all work in connection with such hazardous condition in any area affected thereby (except in an emergency as required by Article 6) and notify OWNER and OWNER in writing. OWNER shall promptly evaluate such hazardous condition and take corrective action. CONTRACTOR shall not be required to resume work in any such affected area until after OWNER has delivered to CONTRACTOR written notice specifying that such condition and any affected area has been rendered safe for the re-assumption of work, or specifying any special conditions under which such work may be resumed safely.

4.6.3 Dispute - If, after receipt of such special written notice, CONTRACTOR does not agree to resume work based on a reasonable belief it is unsafe, or does not agree to resume work under such special conditions, then OWNER may order such portion of the work that is in connection with such hazardous condition or in such affected area to be deleted from the WORK. OWNER may have such deleted portion of the work performed by OWNER’s own forces or others in

4.a
Packet Pg. 83
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 16 accordance with Article 7. If OWNER and CONTRACTOR cannot agree as to entitlement to or the amount or extent of an adjustment, if any, in Contract Price or Contract Time as a result of work stoppage or of deleting such portion of the WORK, then either party may make a Claim as provided in Article 16.

4.6.4 NOT USED
ARTICLE 5 -- BONDS AND INSURANCE

5.1 PERFORMANCE, PAYMENT AND OTHER BONDS

5.1.1 Bond Requirement - CONTRACTOR shall furnish Performance and Payment Bonds, each in the amount set forth in the Supplementary General Conditions as security for the faithful performance and payment of all CONTRACTOR’s obligations under the Contract Documents.

These Bonds shall remain in effect at least until one (1) year after the filing date of Notice of Completion, except as otherwise provided by law or regulation or by the Contract Documents.

CONTRACTOR shall also furnish such other Bonds as are required by the Supplementary General Conditions.

5.1.2 Licensed Surety - All Bonds shall be in the form prescribed by the Contract Documents and by such sureties which are admitted insurers in the State of California and are subject to regulation by the Department of Insurance, and which also satisfy the requirements stated in section 995.660 of the Code of Civil Procedure, except as provided otherwise by Laws or Regulations. All Bonds signed by an agent must be accompanied by a certified copy of such agent’s authority to act. Surety companies must be duly licensed or authorized in the jurisdiction in which the Project is located to issue Bonds for the limits so required. Such surety companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary General Conditions.

5.1.3 Bankrupt or Insolvent Surety - If the surety on any Bond furnished by CONTRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the WORK is located, CONTRACTOR shall within seven (7) Days thereafter substitute another Bond and Surety, which must be acceptable to OWNER per paragraph 5.1.1 and

5.1.2 above.

5.2 NOT USED
ARTICLE 6 -- CONTRACTOR’S RESPONSIBILITIES

6.1. Responsibility Of CONTRACTOR To Perform - Unless otherwise specified in the Contract Documents, CONTRACTOR shall furnish and assume full responsibility for all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities and all other facilities and incidentals necessary for the furnishing, performance, testing, start-up and completion of the

4.a
Packet Pg. 84
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 17 WORK. Such support that may need to be provided after normal working hours will be provided by CONTRACTOR at its expense.

6.2 Labor, Materials and Equipment All materials and equipment to be incorporated into the WORK shall be of good quality and new, except as otherwise provided in the Contract Documents.

All warranties and guarantees specifically called for by the Specifications shall expressly run to the benefit of OWNER. If required by OWNER, CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the kind and quality of materials and equipment.

All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable Supplier except as otherwise provided in the Contract Documents; but no provisions of any such instructions will be effective to assign to OWNER, any duty or authority to supervise or direct the furnishing or performance of the WORK.

6.2.1 The completed work shall include all necessary permanent Safety devices, such as machinery guards, emergency stops and similar Safety items required by OSHA, Cal-OSHA and other Federal, State and local health and Safety regulations. In addition, all equipment, products, components and/or package systems shall be designed, fabricated and installed in compliance with Seismic Zone 4 structural criteria. Further, any features of the work (including OWNER-selected equipment) subject to such Safety regulations and structural criteria shall be fabricated, furnished and installed in compliance with Seismic Zone 4 structural criteria. CONTRACTOR shall include provisions of this Article in his agreements with Subcontractors, Suppliers and manufacturers of equipment and/or products.

In selecting and/or accepting equipment and/or products for installation in the WORK, OWNER, OWNER and OWNER assume no responsibility for the injury, property damage or any other damages or claims resulting from failure of the equipment, products, components and/or package systems to comply with applicable Safety Codes or requirements, or the Safety requirements of a recognized agency, or failure due to manufacturer’s faulty design concepts, or Defective Work and materials. CONTRACTOR shall defend, indemnify and hold OWNER, OWNER and OWNER harmless against any and all liability, claims, suits, damages, costs or expenses caused or claimed to be caused in whole or in part by the negligence or willful misconduct of the construction CONTRACTOR connected with the WORK. However, this indemnity will not extend to any loss, damage or expense caused by the established sole gross negligence or willful misconduct of OWNER or OWNER’s Agents, servants or independent contractors.

6.3 SUPERVISION, SUPERINTENDENCE AND QUALITY - CONTRACTOR shall supervise, inspect and direct the WORK competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the WORK in accordance with the Contract Documents. CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences and procedures of construction and Safety precautions and programs incidental thereto. CONTRACTOR shall be responsible to see that the completed WORK complies accurately with the Contract Documents. CONTRACTOR is solely responsible for the quality of the WORK.

6.4 SUPERINTENDENT

4.a
Packet Pg. 85
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 18

6.4.1 Written Designation of Superintendent - CONTRACTOR shall designate in writing and keep on the work site at all times during its progress a technically qualified, English-speaking superintendent and an alternate who are employees of CONTRACTOR and who shall not be replaced without written notice to OWNER and OWNER. The superintendent will be CONTRACTOR’s representative at the site and shall have authority to act on behalf of CONTRACTOR. All communications given to the superintendent shall be as binding as if given to CONTRACTOR. CONTRACTOR shall issue all its communications to OWNER and OWNER through OWNER.

6.4.2 Superintendent’s Presence at Site - CONTRACTOR’s superintendent or alternate shall be present at the site of the WORK at all times while work is in progress, and shall be available by phone for emergencies twenty-four (24) hours per Day, seven (7) Days per week. Failure to observe this requirement shall be considered suspension of the WORK by CONTRACTOR until such time as such the superintendent is again present at the site.

6.4.3 Removal of Superintendent - Upon written notice, OWNER may require replacement and removal from the WORK of CONTRACTOR’s superintendent with cause, in which case CONTRACTOR shall submit a replacement superintendent subject to approval by OWNER, at no increase in Contract Price or Contract Time. Repeated Safety violation on the job site will be sufficient grounds for directing such replacement.

6.5 LABOR - CONTRACTOR shall provide competent, suitably-qualified personnel to survey and lay out the WORK and perform construction as required by the Contract Documents. Any person employed who is found to be incompetent, intemperate, troublesome, disorderly or otherwise objectionable, or who fails or refuses to perform work properly, acceptably and safely, shall be immediately removed from the WORK by CONTRACTOR and not be reemployed on the WORK. CONTRACTOR shall furnish, erect, maintain and remove the construction plant and any temporary works as may be required. CONTRACTOR shall at all times maintain good discipline and order at the site and will not permit the use or consumption of drugs (illegal substances) or alcoholic beverages at the site.

6.5.1 No Additional Compensation for Overtime - Except as otherwise provided in this Article, CONTRACTOR shall receive no additional compensation for overtime work, (i.e., work in excess of eight (8) hours in any one (1) calendar Day or forty (40) hours in any one (1) calendar week) even though such overtime work may be required under emergency conditions and may be ordered by OWNER in writing. Additional compensation will be paid CONTRACTOR for overtime work only in the event extra work is ordered by OWNER, and the Change Order specifically authorizes the use of overtime work and then only to such extent as overtime wages are regularly being paid by CONTRACTOR for overtime work of a similar nature in the same locality.

6.5.2 Approval Required to Work Outside Normal Work Hours - Except in connection with the Safety or protection of persons or the WORK or property at the site or adjacent thereto, and except as otherwise indicated in the Contract Documents, all work at the site shall be performed during normal working hours, and CONTRACTOR will not permit overtime work or the performance of work on Saturday, Sunday or any holiday observed by OWNER without

4.a
Packet Pg. 86
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 19 OWNER’s written consent. CONTRACTOR shall apply for this consent through OWNER.

OWNER has to approve CONTRACTOR working Holidays, weekends or overtime.

CONTRACTOR will be responsible for reimbursing OWNER for all cost to provide inspection services required to monitor WORK outside of normal working hours. CONTRACTOR will be charged for this actually incurred direct hourly cost plus OWNER-approved overhead cost plus OWNER-approved profit, and a deductive Change Order will be issued to cover this expense.

6.5.3 SUBCONTRACT LIMITATIONS - CONTRACTOR shall perform not less than twenty (20) percent of the WORK with its own forces without subcontracting. This requirement refers to the WORK whose value will not be less than twenty (20) percent of the Contract Price.

6.6 PROGRESS SCHEDULE - CONTRACTOR shall adhere to the progress schedule established in accordance with the General Requirements as it may be adjusted from time to time as provided below:

6.6.1 Non Impacting Adjustments - CONTRACTOR shall submit to OWNER for acceptance proposed adjustments in the progress schedule that will not change the Contract Time (or Milestones). Such adjustments will conform generally to the progress schedule then in effect and additionally will comply with any provisions of the General Requirements applicable thereto.

6.6.2 Revisions To Milestones - Proposed revisions in the progress schedule that will change the Contract Times (or Milestones) shall be submitted in accordance with the requirements of Article

12. Such adjustments may only be made by a Change Order in accordance with Article 12 of the General Conditions.

6.7 SUBSTITUTES OR “OR-EQUAL” ITEMS - Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent or “or-equal” item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be submitted to OWNER for review under the circumstances described below.

6.7.1 “Or-Equal” Items: If in OWNER’s sole discretion an item of material or equipment proposed by CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in the WORK will be required, it may be considered by OWNER as an “or-equal” item, in which case review and approval of the proposed item may, in OWNER’s sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. A proposed item of material or equipment will be considered functionally equal to an item so named if:
a. in the exercise of reasonable judgment OWNER determines that:
i. it is at least equal in materials of construction, quality, durability, appearance, strength and design characteristics;
ii. it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the WORK as a functioning whole;

4.a
Packet Pg. 87
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 20 iii. it has a proven record of performance and availability of responsive service; and
b. CONTRACTOR certifies that, if approved and incorporated into the WORK:
i. there will be no increase in cost to OWNER or increase in Contract Time, and
ii. it will conform substantially to the detailed requirements of the item named in the Contract Documents.

6.7.2 Substitute Items
a. If in CONTRACT MANAGER’s sole discretion an item of material or equipment proposed by CONTRACTOR does not qualify as an “or-equal,” it will be considered a proposed substitute item.
b. CONTRACTOR shall submit sufficient information as provided below to allow CONTRACT MANAGER to determine that the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefore. Requests for review of proposed substitute items of material or equipment will not be accepted by CONTRACT MANAGER from anyone other than CONTRACTOR.
c. The procedure requirements for review by CONTRACT MANAGER will be as set forth in Paragraph 6.7.2.d, and as CONTRACT MANAGER may decide is appropriate under the circumstances.
d. CONTRACTOR shall make written application to CONTRACT MANAGER for review of a proposed substitute item of material or equipment that CONTRACTOR seeks to furnish or use. The application:
i. shall certify that the proposed substitute item will:

1. perform adequately the functions and achieve the results called for by the general design,

2. be similar in substance to that specified, and

3. be suited to the same use as that specified;
ii. will state:

1. the extent, if any, to which the use of the proposed substitute item will prejudice CONTRACTOR’s achievement of Substantial
Completion on time;

2. whether or not use of the proposed substitute item in the WORK will require a change in any of the Contract Documents (or in the provisions of any other direct contract with OWNER for other work on the Project) to adapt the design to the proposed substitute item; and

3. whether or not incorporation or use of the proposed substitute item in connection with the WORK is subject to payment of any license fee or royalty;
iii. will identify:

1. all variations of the proposed substitute item from that specified, and

2. available engineering, sales, maintenance, repair and replacement services;

4.a
Packet Pg. 88
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 21 iv. and shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and claims of other contractors affected by any resulting change.

6.7.3 Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence or procedure of construction is expressly required by the Contract Documents, CONTRACTOR may furnish or utilize a substitute means, method, technique, sequence or procedure of construction approved by CONTRACT MANAGER. CONTRACTOR shall submit sufficient information to allow CONTRACT MANAGER, in CONTRACT MANAGER’s sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. The requirements for review by CONTRACT MANAGER will be similar to those provided in Paragraph 6.7.2.d.

6.7.4 Contract Manager’s Evaluation: CONTRACT MANAGER will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs

6.7.2.d and 6.7.3. CONTRACT MANAGER may require CONTRACTOR to furnish additional data about the proposed substitute item. CONTRACT MANAGER will be the sole judge of acceptability. No “or equal” or substitute will be ordered, installed or utilized until CONTRACT MANAGER’s review is complete, which will be evidenced by either a Change Order for a substitute or an approved Shop Drawing for an “or equal.” CONTRACT MANAGER will advise CONTRACTOR in writing of any negative determination.

6.7.5 Special Guarantee: OWNER may require CONTRACTOR to furnish at CONTRACTOR’s expense a special performance guarantee or other surety with respect to any substitute.

6.7.6 Contract Manager’s Cost Reimbursement: CONTRACT MANAGER will record CONTRACT MANAGER’s costs in evaluating a substitute proposed or submitted by CONTRACTOR pursuant to Paragraphs 6.7.2.d and 6.7.3. Whether or not CONTRACT MANAGER approves a substitute item so proposed or submitted by CONTRACTOR, CONTRACTOR shall reimburse OWNER for the charges of CONTRACT MANAGER for evaluating each such proposed substitute. CONTRACTOR shall also reimburse OWNER for the charges of CONTRACT MANAGER for making changes in the Contract Documents (or in the provisions of any other direct contract with OWNER) resulting from the acceptance of each proposed substitute.

6.7.7 CONTRACTOR’s Expense: CONTRACTOR shall provide all data in support of any proposed substitute or “or-equal” at CONTRACTOR’s expense

6.8 PROJECT SITE COORDINATION

6.8.1 Work By Others - CONTRACTOR shall be responsible for ascertaining the nature and extent of any simultaneous, collateral and essential work by others as described in the General Requirements.

4.a
Packet Pg. 89
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 22 CONTRACTOR shall provide staging areas and include work windows for work by others into the overall construction schedule. No additional working days will be allowed for CONTRACTOR’s failure to coordinate work by others.

6.8.2 Coordination Of Work - OWNER, CONTRACTOR and each of such workers, contractors and others shall cooperate to minimize interference.

6.8.3 Cost Of Coordination - CONTRACTOR shall include in its Bid all costs involved as a result of coordinating its WORK with others. CONTRACTOR will not be entitled to additional compensation from OWNER for damages resulting from such simultaneous, collateral and essential work. CONTRACTOR’s sole and exclusive remedy as a third party beneficiary to other prime contracts for damages caused by another contractor will be a direct action against the separate contractor. If necessary to avoid or minimize such damage or delay, CONTRACTOR shall redeploy its work force to other parts of the WORK.

6.8.4 Obligation to Provide Access - CONTRACTOR shall afford each other contractor who is a party to such a direct contract and each utility owner (or OWNER, if OWNER is performing the additional work with OWNER’s employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such work, and shall properly connect and coordinate work performed by others with their WORK as described in these Contract Documents.

6.8.5 CONTRACTOR shall do all cutting, fitting and patching of the WORK that may be required to make its several parts come together properly and integrate with such other work.

6.8.6 CONTRACTOR shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of OWNER and the others whose work will be affected.

6.9 COORDINATION WITH SUBCONTRACTORS AND SUPPLIERS

6.9.1 CONTRACTOR shall be solely responsible for scheduling and coordinating the WORK of Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the WORK under a direct or indirect contract with CONTRACTOR. CONTRACTOR shall require all Subcontractors, Suppliers and such other persons and organizations performing or furnishing any of the WORK to communicate with OWNER through CONTRACTOR. All WPRL performed by a Subcontractor or Supplier will be pursuant to an appropriate agreement between CONTRACTOR and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents.

6.9.2 Subcontractor has no contractual relationship with OWNER. Nothing contained in this Article shall create any contractual relationship between any Subcontractor and OWNER or OWNER, nor relieve CONTRACTOR of any liability or obligation under the Agreement.

CONTRACTOR shall include these General Conditions and the Supplementary General Conditions as a part of all its subcontract agreements.

4.a
Packet Pg. 90
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 23

6.9.3 DIVISION OF WORK - The divisions and sections of the Specifications and the identifications of any Drawings shall not control CONTRACTOR in dividing the WORK among Subcontractors or Suppliers or delineating the WORK to be performed by any specific trade.

6.10 PATENT FEES AND ROYALTIES - CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use in the performance of the WORK or the incorporation in the WORK of any invention, design, process, product or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product or device is specified in the Contract Documents for use in the performance of the WORK and if to the actual knowledge of OWNER, or OWNER, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by OWNER in the Contract Documents.

6.11 PERMITS - Unless otherwise provided in the Supplementary General Conditions, CONTRACTOR shall obtain and pay for all construction permits and licenses from the agencies having jurisdiction, including the furnishing of insurance and Bonds if required by such agencies.

The enforcement of such requirements under this Agreement shall not be made the basis for claims for additional compensation. OWNER shall assist CONTRACTOR, only when necessary, in obtaining such permits and licenses. CONTRACTOR shall pay all governmental charges and inspection fees necessary for the prosecution of the WORK, which are applicable at the time of opening of Bids. CONTRACTOR shall pay all charges of utility owners for connections to the WORK.

6.12 LAWS AND REGULATIONS - CONTRACTOR shall observe and comply with all Federal, State and local laws, ordinances, Codes, orders and regulations which in any manner affect those engaged or employed on the WORK, the materials used in the WORK or the conduct of the WORK. If any discrepancy or inconsistency should be discovered in this Agreement in relation to any such law, ordinance, code, order or regulation, CONTRACTOR shall immediately report the same in writing to OWNER.

6.13 TAXES - CONTRACTOR shall pay all sales, consumer, use and other similar taxes required to be paid in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance of the WORK. OWNER is not exempt from sales tax.

6.14 Intentionally Omitted.

6.15 USE OF PREMISES

6.15.1 General - CONTRACTOR shall confine construction equipment, the storage of materials and equipment and the operations of workers to the Project site, the land and areas identified in and permitted by the Contract Documents and the other land and areas permitted by Laws and Regulations, rights-of-way, permits and easements as approved by OWNER. CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof or of any land or areas contiguous thereto, resulting from the performance of the WORK. Should any claim be made against OWNER or OWNER by any such owner or occupant

4.a
Packet Pg. 91
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 24 because of the performance of the WORK, CONTRACTOR shall promptly attempt to settle with such other party by agreement or otherwise resolve the claim through litigation.

6.16 PROJECT SITE MAINTENANCE AND INTERFERENCE WITH ADJACENT

PROPERTY

6.16.1 Cost of General Requirements in Contract Price - CONTRACTOR is obligated to comply with the General Requirements. All costs associated with this compliance are to be included in the basic Contract Price.

6.16.2 Vehicle Load Limits - When materials are transported in prosecuting the WORK, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by law or regulation. When it is necessary to cross curbs, sidewalks or drainage facilities CONTRACTOR shall protect them from damage.

6.16.3 Work Outside The Agreement Limits - Despite the designation of Contract Documents or the indication of temporary fences or barricades, the provisions of the Contract Documents governing certain portions of the WORK may require that certain operations be carried out beyond such limits. In those cases, trenching, utility work, site development and landscaping shall be scheduled so as to occasion a minimum of inconvenience or disturbance to or interference with the normal operation of the owner, abutters and the public. CONTRACTOR shall obtain OWNER’s prior approval and all necessary approvals from other agencies, public entities or the government for such operations, and prosecute such operations expeditiously and restore the premises affected to their original condition immediately upon completion of such operations, unless otherwise specified in the Contract Documents. All existing walks, roadways, paved or landscaped areas on which temporary driveways or walks are rerouted shall be restored to their original condition, immediately upon completion of those phases of the WORK, unless otherwise specified in the Contract Documents. Pumping, draining and control of surface and ground water shall be carried out so as to avoid endangering the WORK or any adjacent facility or property, or interrupting, restricting or otherwise infringing or interfering with its use.

6.16.4 Responsibilities For Damage - All damage, injury or loss to any persons or property caused, directly or indirectly, in whole or in part, by CONTRACTOR, any Subcontractor, Supplier or any other person or organization directly or indirectly employed by any of them to perform or furnish any of the WORK or anyone for whose acts any of them may be liable, shall be remedied by CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of OWNER or OWNER or OWNER). CONTRACTOR’s duties and responsibilities for Safety and for protection of the WORK shall continue until such time as all the WORK is completed and OWNER has issued a notice to OWNER and CONTRACTOR in accordance with Article 14 that the WORK is complete.

6.17 CONTRACTOR’S DAILY REPORTS - CONTRACTOR shall complete a daily report indicating his total manpower for each construction trade, major equipment on site, each Subcontractor’s manpower, weather conditions and any other items required by OWNER. The daily report shall be completed on forms provided by OWNER and shall be submitted to OWNER by 9:00 a.m. the following work Day. The report should comment on the daily progress and status

4.a
Packet Pg. 92
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 25 of the work within each major component of the WORK. These components will be determined by OWNER. Submitting acceptable daily reports as required is a precondition to approval of the monthly progress payment. However, these reports are not to be used to meet the notice requirements contained elsewhere in the General Conditions.

6.18 SAFETY

6.18.1 Safety Plan - CONTRACTOR will be required to comply with General Requirements provided by OWNER. CONTRACTOR shall submit a written Safety plan to OWNER prior to commencement of any work on site. CONTRACTOR shall be responsible for initiating, maintaining and supervising all Safety precautions and programs in connection with the WORK.

6.18.2 Safety Laws and Regulations - CONTRACTOR shall comply with all applicable Laws and Regulations of any public body having jurisdiction for the Safety of persons or property or to protect them from damage, injury or loss and shall erect and maintain all necessary safeguards for such Safety and protection. CONTRACTOR shall notify owners of adjacent property and of Underground Utilities when prosecution of the WORK may affect them and shall cooperate with them in the protection, removal, relocation and replacement of their property.

6.18.3 Safety Representative - CONTRACTOR shall designate a qualified and experienced Safety representative at the site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of Safety precautions and program. The Safety representative must meet the requirements stated in Supplemental General Conditions 6.18 “Safety.”

6.18.4 Safety Orders - CONTRACTOR shall have at the WORK site as applicable, copies or suitable extracts of: Construction Safety Orders, Tunnel Safety Orders and General Industry Safety Orders issued by the State Division of Industrial Safety. CONTRACTOR shall comply with provisions of these and all other applicable laws, ordinances and regulations.

6.18.5 Trench Shoring Plan - Before excavating any trench five (5) feet or more in depth, CONTRACTOR shall submit to OWNER a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for the workers’ protection from the hazard of caving ground during the excavation of such trench. If the plan varies from the shoring system standards, the plan shall be prepared by a California registered civil OWNER. No excavation shall start until OWNER has accepted the plan and CONTRACTOR has obtained a permit from the State Division of Industrial Safety. A copy of the permit shall be submitted to OWNER and posted at the site.

6.18.6 Use of Explosives - Explosives may be used only when authorized in writing by OWNER, or as otherwise stated in the Specifications. Explosives shall be handled, used and stored in accordance with all applicable regulations. OWNER’s approval of the use of explosives shall not relieve CONTRACTOR from liability for claims caused by blasting operations.

6.18.7 Hazardous Communication Program

4.a
Packet Pg. 93
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 26

6.18.7.1 Notification to employees is required when materials that contain hazardous substances or mixtures are required on the WORK. A material safety data sheet as described in section 5194 of the California Code of Regulations shall be requested by CONTRACTOR from the manufacturer of any hazardous product used.

6.18.7.2 Material usage shall be accomplished with strict adherence to California Division of Industrial Safety requirements and all manufacturer’s warnings and application instructions listed on the material safety data sheet and on the product container label.

6.18.7.3 CONTRACTOR shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the site in accordance with laws or regulations, with copies to OWNER.

6.18.7.4 Unsafe Products - CONTRACTOR shall notify OWNER if it considers a specified or required product or its intended usage to be unsafe. This notification must be given to OWNER prior to the product being ordered, or if provided by some other party, prior to the product being used or incorporated in the WORK.

6.18.8 Safety Measures In Bid - Payment for performing all work necessary to provide Safety measures shall be included in the prices bid for other items of work except where separate bid items for excavation Safety are provided.

6.18.9 Safety Reporting

6.18.9.1 Weekly First Aid Logs - This log should be delivered to OWNER three (3) Days after the weekly reporting period.

6.18.9.2 Accident and Injury Reports - This report should be delivered within twenty-four (24) hours of the injury or accident.

6.18.10 OWNER Safety Deficiency Report - CONTRACTOR is required to respond to this report within two (2) working Days explaining his corrective action and proposed schedule for this action.

6.19 EMERGENCY - In emergencies affecting the Safety or protection of persons or the WORK or property at or adjacent to the site, CONTRACTOR, without special instruction or authorization from OWNER, is obligated to act to prevent threatened damage, injury or loss. CONTRACTOR shall give OWNER prompt written notice if CONTRACTOR believes that any significant changes in the WORK have resulted because of the action taken in response to an emergency. If it is determined by OWNER that a change is required, a change shall be authorized by Change Order.

6.20 SHOP DRAWINGS AND SAMPLES

6.20.1 After checking and verifying all field measurements and after complying with applicable procedures specified in the General Requirements, CONTRACTOR shall submit to OWNER for

4.a
Packet Pg. 94
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 27 OWNER’s review all Shop Drawings in accordance with the accepted schedule of Shop Drawings Submittals specified in Bidding Documents section Bid Forms.

6.20.2 CONTRACTOR shall also submit to OWNER for review all Samples in accordance with the accepted schedule of sample Submittals specified in the General Requirements.

6.20.3 Before submittal of each Shop Drawing or Sample, CONTRACTOR shall have determined and verified all quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers and similar data with respect thereto and reviewed or coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the WORK and the Contract Documents.

6.20.4 CONTRACTOR shall, at his own expense, furnish for review, and obtain approval by the OWNER, three (3) copies each of detailed submittals for materials, installation drawings, and construction procedures for the following:
 Any material which differ from that specified with a brand name on the Plans and in this Special Provisions
 Public notification flyers
 Crack Seal mixes
 Traffic control plans
 Portland cement concrete design mix
 Conventional Asphalt mixes
 RHMA/ARHM submittal
 ARAM submittal
 Class II Base (if used)
 Tack Coat Oil
 Manhole Lid and/or material pertaining to the adjustment  Valve Can, Lid and/or material pertaining to the adjustment  Monument Well Can, Lid and/or material pertaining to the adjustment  Monument Preservation Certificate (prior to any construction/demolition activities)  Striping plans / Contractor notes
 Striping Paint, Thermoplastic, reflective beads, pavement markers and other material pertaining to installation of new traffic striping
In addition, OWNER’s representative may, at his discretion, require shop drawings on other equipment or construction activities not included in the above list. OWNER’s representative shall have ten (10) working days to review and return the shop drawings to CONTRACTOR after receipt of said drawings.

6.21 SUBMITTAL ACCEPTANCE

6.21.1 OWNER Review Scope and Limitation - OWNER will review and approve Shop Drawings and Samples. OWNER’s review and approval will be only to determine if the items

4.a
Packet Pg. 95
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 28 covered by the Submittals will, after installation or incorporation in the WORK, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. OWNER’s review and approval will not extend to means, methods, techniques, sequences or procedures of construction except where a particular means, method, technique, sequence or procedure of construction is specifically and expressly called for by the Contract Documents or to Safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. CONTRACTOR shall make corrections required by OWNER, and shall return the required number of corrected copies of Shop Drawings and submit as required new Samples for review and approval. CONTRACTOR shall direct specific attention in writing to revisions other than the corrections called for by OWNER on previous Submittals.

6.21.2 CONTRACTOR’s Responsibility Not Relieved By Approval - OWNER’s and OWNER’s review and approval of Shop Drawings or Samples shall not relieve CONTRACTOR from responsibility for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called OWNER’s attention to each such variation at the time of submission and OWNER has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample approval; nor will any approval by OWNER relieve CONTRACTOR from responsibility for complying with the requirements of Article 6.

6.22 COMPLIANCE WITH OWNER ADMINISTRATIVE PROCEDURES -
CONTRACTOR is required to comply with all OWNER administrative procedures including but not limited to daily reports, Requests for Proposal, Safety reporting, notice requirements, payment procedures, submittal processing, attendance at weekly and special meetings and others designated by OWNER.

6.23 ASSIGNMENT OF CONTRACT - CONTRACTOR shall not assign, sublet, sell, transfer or otherwise dispose of the Contract Documents or any portion thereof, or its right, title or interest therein, or obligations thereunder, without the written consent of OWNER except as imposed by law. If CONTRACTOR violates this provision, the Agreement may be terminated at the option of OWNER. In such event, OWNER shall be relieved of all liability and obligations to CONTRACTOR and to its assignee or transferee growing out of such termination.

6.24 CONTINUING THE WORK DURING DISPUTES

6.24.1 CONTRACTOR shall carry on the WORK and adhere to the progress schedule during all disputes or disagreements with OWNER over any WORK scope, price or time dispute. No work shall be delayed or postponed pending resolution of any disputes or disagreements, except as CONTRACTOR and OWNER may otherwise agree in writing.

6.24.2 If CONTRACTOR and OWNER are unable to reach agreement on Disputed Work, OWNER may direct CONTRACTOR to proceed with the WORK. Payment shall be as later determined by Article 16.

4.a
Packet Pg. 96
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 29

6.25 GENERAL WARRANTY AND GUARANTEE CONTRACTOR is responsible for providing warranty and guarantee in accordance with Article 13.

6.26.11 Survival of Obligations - All representations, indemnifications, warranties and guarantees made in, required by or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive Final Payment, completion and acceptance of the WORK and termination or completion of the Agreement.

ARTICLE 7 -- WORK BY OTHERS AT THE SITE

7.1 OWNER’S RIGHT TO WORK AT SITE - OWNER may perform other work related to the Project at the site by OWNER’s own forces, have other work performed by utility owners, or let other direct contracts which may contain General Conditions similar to these. If the fact that such other work is to be performed was not noted in the Contract Documents, written notice thereof will be given to CONTRACTOR prior to starting any such other work.

7.2 CONTRACTOR REPORT ON DELAYS CAUSED BY OTHERS - If the proper execution or results of any part of CONTRACTOR’s work depends upon the work of any such other contractor or utility owner (or OWNER), CONTRACTOR shall promptly inspect and report to OWNER in writing any apparent delays, defects or deficiencies in such other work that render it unavailable or unsuitable for such proper execution and results. CONTRACTOR’s failure to report such delays, defects or deficiencies in writing before commencement of the affected WORK will constitute an acceptance of the other work as fit and proper for integration with CONTRACTOR’s work except for latent defects and deficiencies in the other work.

7.3 DAMAGE TO OTHERS CAUSED BY CONTRACTOR - If CONTRACTOR causes damage to the work, property or person of any other contractor employed by OWNER, or if any claim arising out of CONTRACTOR’s performance of the WORK by any other contractor is made against CONTRACTOR, by OWNER, OWNER, OWNER, any other contractor or any other person, CONTRACTOR shall be responsible to settle and shall promptly attempt to settle and resolve the dispute.

7.4 COORDINATION

7.4.1 Coordination Responsibilities - CONTRACTOR’s coordination responsibilities are in accordance with those found in Article 6 and in the described Supplementary General Conditions if applicable.

7.4.2 Coordination Delays - Should CONTRACTOR be delayed by OWNER, and such delay could not reasonably have been foreseen and prevented by CONTRACTOR, OWNER will determine the extent of the delay, the effect of the delay on the work as a whole, and any commensurate extension of time. OWNER shall arrange meetings with other contractors performing work on behalf of OWNER to plan coordination of construction activities. Any difference or conflict arising between CONTRACTOR and any other contractor employed by OWNER shall be submitted to OWNER for a decision in the matter. CONTRACTOR shall comply with reasonable direction from OWNER whose decision on coordination matters will be final.

4.a
Packet Pg. 97
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 30

7.5 Remedy For Delays By Others - By entering into this Agreement, CONTRACTOR acknowledges that there may be other contractors on the site whose WORK will be coordinated with that of his own. CONTRACTOR expressly warrants and agrees that he will cooperate with other contractors and will do nothing to delay, hinder or interfere with the WORK of other separate contractors, OWNER, OWNER or OWNER. CONTRACTOR also expressly agrees that, in the event his work is hindered, delayed, interfered with or otherwise affected by a separate contractor, his sole remedy will be a direct action against the separate contractor. CONTRACTOR will have no remedy, and hereby expressly waives any remedy, against OWNER and/or OWNER or OWNER on account of delay, hindrance, interference or other event caused by a separate contractor.

7.6 Out Of Sequence Or Accelerated Work - When WORK is performed out of sequence and ahead of Interfacing Work, CONTRACTOR shall be responsible for taking reasonable steps to minimize damage or loss to the WORK which may be caused by others during the performance of their work, including but not limited to furnishing prompt written notice to OWNER and to the other contractors that WORK has been performed out of sequence and ahead of Interfacing Work.

7.7 NATIONAL LABOR RELATIONS BOARD REQUIREMENTS - CONTRACTOR’s Price shall include all costs associated with complying with National Labor Relations Board requirements for accessing the Project site.

ARTICLE 8 -- OWNER’S RESPONSIBILITIES

8.1 GENERAL - OWNER has the final authority in all matters affecting the WORK.

8.2 COMMUNICATIONS - In general, OWNER and OWNER shall issue all written communications to CONTRACTOR through OWNER.

8.3 PAYMENTS - OWNER shall make payments to CONTRACTOR as provided in Article 14.

8.4 LANDS, EASEMENTS AND SURVEYS - OWNER’s duties in respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Article 4. OWNER shall identify and make available to CONTRACTOR copies of reports of explorations and tests of subsurface conditions at the site and in existing structures which have been utilized in preparing the Contract Documents as set forth in Article 4.

8.5 CHANGE ORDERS - OWNER shall execute Change Orders as indicated in Article 10.

8.6 INSPECTIONS AND TESTS - OWNER’s responsibility with respect to inspections, tests and approvals is set forth in Article 13.

8.7 SUSPENSION OF WORK - In connection with OWNER’s right to stop work or suspend work, see Articles 13 and 15.

4.a
Packet Pg. 98
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 31

8.8 TERMINATION OF AGREEMENT - Article 15 deals with OWNER’s right to terminate services of CONTRACTOR.

8.9 OWNER’S RESPONSIBILITY FOR UNDISCLOSED HAZARDOUS MATERIALS - OWNER’S responsibility with respect to undisclosed Asbestos, PCBs, Petroleum, Hazardous Waste or Radioactive Materials uncovered or revealed at the site is set forth in Article 4.

8.10 NO OWNER SUPERVISION INTENDED - Neither OWNER nor OWNER shall supervise, direct or have control or authority over, nor be responsible for, CONTRACTOR’s means, methods, techniques, sequences or procedures of construction or the Safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the furnishing or performance of the WORK. OWNER and OWNER will not be responsible for CONTRACTOR’s failure to perform or furnish the WORK in accordance with the Contract Documents.

ARTICLE 9 -- OWNER’S STATUS DURING CONSTRUCTION

9.1 GENERAL

9.1.1 OWNER’S REPRESENTATIVE - OWNER will be OWNER’s representative during the construction period. The duties and responsibilities and the authority of OWNER as OWNER during construction are set forth in the Contract Documents.

9.1.2 Contract Documents Terms - Whenever in the Contract Documents the terms “as ordered,” “as directed,” “as required,” “as allowed,” “as reviewed,” “as approved,” or terms of like effect or import are used, or the adjectives “reasonable,” “suitable,” “acceptable,” “proper,” or “satisfactory” or adjectives of like effect or import are used to describe a requirement, direction, review or judgment of OWNER as to the WORK, it is intended that such requirement, direction, review or judgment will be solely to evaluate the WORK for compliance with the requirements of the Contract Documents, and conformance with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents, unless there is a specific statement indicating otherwise. The use of any such term or adjective shall not be effective to assign to OWNER any duty or authority to supervise or direct the performance of the WORK or any duty or authority to undertake responsibility contrary to the Article 9.

9.2 PRESENCE ON SITE - OWNER will be on site during construction to observe the progress, quantity and quality of the WORK and to determine, in general, if the WORK is proceeding in accordance with the Contract Documents. OWNER will not supervise, direct or have control over CONTRACTOR’s work.

9.3 CONTRACT DOCUMENT CLARIFICATIONS AND INTERPRETATIONS - OWNER will issue with reasonable promptness such written clarifications or interpretations of the requirements of the Contract Documents (in the form of Drawings or otherwise) as OWNER may determine necessary, which shall be consistent with or reasonably inferable from the overall intent of the Contract Documents. Such written clarifications and interpretations will be binding on OWNER and CONTRACTOR. If CONTRACTOR believes that a written clarification or

4.a
Packet Pg. 99
Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 32 interpretation justifies an adjustment in the Contract Price or the Contract Time and the parties are unable to agree to the amount or extent CONTRACTOR may request an adjustment in the Contract Price or an extension of the Contract Time therefore as provided in Articles 11 or 12.

9.4 AUTHORIZED VARIATIONS IN WORK - OWNER may authorize minor variations in the WORK, (not resulting in changes to the Contract Price or Contract Time), which are consistent with the intent of the Contract Documents. These may be accomplished by an OWNER Order. If CONTRACTOR believes that a OWNER Order justifies an increase in the Contract Price or an extension of the Contract Time, CONTRACTOR may request an adjustment in the Contract Price or an extension of the Contract Time therefore as provided in Articles 11 or 12. If CONTRACTOR proceeds with the directed work without making such a request or providing notice he will be presumed to be in agreement with OWNER’s determination that no change in price or time are involved, and will be considered to have waived his right to request an adjustment in Contract Time or Price.

9.5 ACCEPTANCE OF WORK - OWNER has the final authority in all matters affecting the WORK. Within the scope of the Agreement, OWNER has the authority to enforce compliance with the Plans and Specifications. CONTRACTOR shall promptly comply with instructions from OWNER or any authorized representative on all matters relating to quantities, the acceptability of material, equipment or work, the execution, progress or sequence of work and the interpretation of Specifications or Drawings. The decision of OWNER shall be precedent to any payment under the Agreement, unless otherwise ordered by OWNER. OWNER will recommend final acceptance to OWNER.

9.6 REJECTING DEFECTIVE WORK - OWNER will have authority to reject work which OWNER determines to be defective, or not in compliance with the Contract Documents or that OWNER or OWNER believes will not produce a completed Project or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. OWNER will also have authority to require special inspection or testing of the WORK as provided in Article 13, whether or not the WORK is fabricated, installed or completed.

9.7 CONTRACTOR SUBMITTALS - CONTRACTOR shall provide submittals in accordance with the SPECIAL PROVISIONS.

9.8 CHANGE ORDER - In connection with OWNER’s responsibilities as to Change Orders, see Articles 10, 11, and 12.

9.9 PAYMENTS In connection with OWNER’s responsibility as to Applications for Payment, see Article 14.

9.10 FINAL APPLICATION FOR PAYMENT - OWNER’s review of the Final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, Bonds and certificates of inspection, tests and approvals and other documentation required to be delivered by Article 14 will only be to determine generally that their

4.a
Packet Pg. 100 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 33 content complies with the requirements of, and in the case of certificates of inspections, tests and approvals that the results certified indicate compliance with the Contract Documents.

9.11 DECISIONS ON DISPUTES

9.11.1 Interpreter Of Contract Documents - OWNER will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the WORK thereunder.

Claims, disputes and other matters relating to the acceptability of the WORK, the interpretation of the requirements of the Contract Documents pertaining to the performance of the WORK and those claims with respect to changes in the Contract Price or Contract Time will be referred initially to OWNER. The process to be followed is described in Article 16.

9.12 OWNER LIABILITY FOR INTERPRETATION - When functioning as interpreter under Article 9, OWNER will not show partiality to OWNER, OWNER or CONTRACTOR and will not be liable in connection with any interpretation or decision rendered in good faith in such capacity.

The rendering of a decision by OWNER pursuant to Article 9 will be a condition precedent to any exercise by CONTRACTOR of such rights or remedies as he may otherwise have under the Contract Documents or by laws or regulations in respect of any such Claim, dispute or other matter pursuant to Article 16.

9.13 LIMITATION ON OWNER’S RESPONSIBILITIES

9.13.1 No Duty Arising Out Of Act Or Decision - Neither OWNER’s authority to act under this Article 9 or other provisions of the Contract Documents, nor any decision made by OWNER in good faith either to exercise or not exercise such authority shall give rise to any duty or responsibility of OWNER to CONTRACTOR, any Subcontractor, any Supplier, any surety for any of them or any other person or organization performing any of the WORK.

9.13.2 No Supervision Role - OWNER will not supervise, direct, control or have authority over or be responsible for CONTRACTOR’s means, methods, techniques, sequences or procedures of construction, or the Safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations, applicable to the performance of the WORK. OWNER will not be responsible for CONTRACTOR’s failure to perform the WORK in accordance with the Contract Documents.

9.13.3 CONTRACTOR Acts Or Omissions - OWNER will not be responsible for the acts or omissions of CONTRACTOR nor of any Subcontractor, Supplier or any other person or organization performing any of the WORK.

ARTICLE 10 -- CHANGES IN THE WORK

10.1 CHANGES REQUESTED BY CONTRACTOR

10.1.1 OWNER Approval - Changes in the Plans and Specifications, requested in writing by CONTRACTOR, which do not materially affect the WORK and which are not detrimental to the WORK or to the interests of OWNER, may be granted to facilitate the WORK, when approved in

4.a
Packet Pg. 101 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 34 writing by OWNER. If the method will result in a cost saving, an appropriate deductive change will be required.

10.1.2 Specified Methods - Changes in specified methods of construction may be made at CONTRACTOR’s request when approved in writing by OWNER. If the method will result in a cost saving, an appropriate deductive change will be required.

10.1.3 No Right To Change - Nothing herein shall be construed as granting a right to CONTRACTOR to demand acceptance of such changes.

10.1.4 Request for Change Made in Good Faith - The request For change shall be made in good faith, and the amount requested accurately reflects the adjustments in Contract Price or Contract Time for which CONTRACTOR believes OWNER is liable, and covers all direct, supplemental, indirect, consequential, serial and cumulative costs and delays to which CONTRACTOR is entitled as a result of the change.

10.2 OWNER’S RIGHT TO MODIFY WORK

10.2.1 Requirement To Implement Directed Change - Without invalidating the Agreement and without notice to any surety, OWNER may at any time or from time to time, order additions, deletions or revisions in the WORK; these will be authorized by a written Change Order prepared by OWNER and issued by OWNER. Upon receipt of any such document, CONTRACTOR shall promptly proceed with the work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided).

10.2.2 Request For Proposal - When OWNER desires a change in the WORK, OWNER will issue a Request for Proposal to CONTRACTOR. CONTRACTOR will be required to respond within the time indicated by OWNER or fifteen (15) Days, whichever is less. If CONTRACTOR fails to meet the submittal time required by this provision, CONTRACTOR will be solely liable for any delays or impacts caused by the delayed submittal of the proposal.

10.3 REQUIREMENT TO PROCEED WITH WORK - If OWNER and CONTRACTOR agree on the value of any work, and the amount of Contract Time that should be allowed as a result of CONTRACTOR’s response to a Request for Proposal, CONTRACTOR shall proceed as directed by OWNER so as to minimize the impact on and delays to the work pending the issuance of a Change Order. If however, OWNER and CONTRACTOR are unable to agree as to the extent of an increase or decrease in the Contract Price or an extension or shortening of the Contract Time that should be allowed as a result of CONTRACTOR’s response to a Request for Proposal, OWNER can direct CONTRACTOR to proceed on the basis of a price for the WORK as estimated by OWNER or time and materials so as to minimize the impact on and delays to the work, in accordance with Article 11.

10.4 WORK NOT IN CONTRACT - CONTRACTOR shall not be entitled to an increase in the Contract Price nor an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, supplemented by Change Order

4.a
Packet Pg. 102 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 35 or Field Order, except in the case of an emergency and except in the case of uncovering work as provided in Article 13.

10.5 CHANGE ORDER PROCESS - OWNER and CONTRACTOR shall execute appropriate Change Orders covering:

10.5.1 OWNER Ordered Changes - Changes in the WORK which are ordered by OWNER pursuant to Article 10;

10.5.2 Changes Due To Defective Work - changes required because of acceptance of Defective Work under Article 13;

10.5.3 Mutually Agreed Price/Time Changes - changes in the Contract Price or Contract Time which are agreed to by the parties.

10.6 NOTICE TO SURETY - If notice of any change is required by the provisions of any Bond to be given to a surety, the giving of any such notice will be CONTRACTOR’s responsibility, and the amount of each applicable Bond shall be adjusted accordingly.

10.7 ALLOWABLE QUANTITY VARIATIONS - In the event of an increase or decrease in bid item quantity of a unit priced item in the Contract Documents, the total amount of WORK actually done or materials or equipment furnished shall be paid for according to the unit price established for such work under the Contract Documents, wherever such unit price has been established; provided, that an adjustment in the unit price may be made for changes which result in an increase or decrease in excess of the allowable percentage variations as set forth by the Contract Documents.

ARTICLE 11 -- CHANGE OF CONTRACT PRICE (Change Orders, Field Orders and Work Orders)

11.1 CONTRACT PRICE CHANGE - The Contract Price may only be changed by a written Change Order.

11.2 METHODS FOR DETERMINING ADJUSTMENTS IN CONTRACT PRICE

11.2.1 Methods - The methods to be used to determine an adjustment in Contract Price necessitated by changes ordered or negotiated pursuant to these General Conditions or work covered by a Request for Proposal are limited to the following:

11.2.1.1 Where the work involved is covered by lump sum prices in the Contract Documents: on the basis of a lump sum negotiation;

11.2.1.2 Where the work involved is covered or is of the same character as Unit Price Work: by application of those unit prices to the quantities of the items involved (subject to the provisions covering Unit Price Work);

4.a
Packet Pg. 103 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 36

11.2.1.3 Where the work involved is not covered by either of the preceding methods: by mutual acceptance of a lump sum price negotiated on the basis of CONTRACTOR’s itemized estimate of the anticipated Cost of the WORK involved, determined as specified in this Article, and a contractor’s fee as provided in this Article;

11.2.1.4 Where the work involved is not covered by either of the first two (2) methods, and OWNER and CONTRACTOR cannot achieve agreement on the anticipated cost of the work involved and OWNER directs CONTRACTOR to proceed with the work with payments to be made on the basis of OWNER’s determination of the cost of the work involved: on a CONTRACTOR’s profit of eighty (80) percent of the amount allowed by this Article;

11.2.1.5 Where the work involved is not covered by either of the first two (2) methods, and OWNER directs CONTRACTOR to proceed with the work involved with payments to be made on the basis of actual costs: on the basis of the actual cost of the work involved, determined as specified in this Article, and a CONTRACTOR’s profit determined as fifty (50) percent of the amount allowed under this Article.

11.2.1.6 Where the work involved is not covered by any of the preceding methods, and when payment is to be determined by a court of competent jurisdiction, it is agreed that the actual cost method used for actual cost basis work shall be an appropriate method for determining the cost of the work involved.

11.2.2 CONTRACTOR’S Overhead and Profit Limitation - For all negotiated Change Orders the allowance for overhead and profit shall include full compensation for superintendence, insurance premiums, taxes, field office expense, extended overhead, home office overhead and all other items of expense or cost not included in the cost of labor, materials or equipment provided for in this Article. The allowance for overhead and profit will not exceed the following schedule:

Overhead Profit
Labor = Ten (10) percent Ten (10) percent
Materials = Ten (10) percent Five (5) percent
Equipment = Ten (10) percent Five (5) percent
To the sum of the costs and markups provided for in this Article, one (1) percent shall be added as compensation for bonding.

11.2.3 Subcontractor Mark Up - It is understood that labor, materials and equipment may be furnished by CONTRACTOR or by the Subcontractor on behalf of CONTRACTOR. When all or any part of the extra work is performed by a Subcontractor, the allowance specified herein shall be applied to the labor, materials and equipment costs of the Subcontractor, to which CONTRACTOR may add five (5) percent of the Subcontractor’s total cost for the extra work.

Regardless of the number of hierarchical tiers of Subcontractors, the five (5) percent increase above the performing Subcontractor’s total cost which includes the allowances for overhead and profit may be applied one (1) time only.

11.2.4 Equipment Rental Rates

4.a
Packet Pg. 104 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 37

11.2.4.1 All equipment rental rates shall be in accordance with the rental rate source identified in the Supplementary General Conditions based on a monthly rate for the equipment, and based on an equipment utilization of one hundred seventy-three (173) hours per month. CONTRACTOR will be permitted to charge only for the hours the equipment is actually used in the changed work.

11.2.4.2 Equipment Required Specifically for the Additional Work - Whenever possible, changed work will be accomplished using equipment available on-site or owned by CONTRACTOR. If no on-site equipment can be used, and a specific piece of equipment must be rented to be used exclusively for the changed work, the rental rate will be the invoiced rate.

11.3 COST OF WORK (BASED ON TIME AND MATERIALS)

11.3.1 General - The term “cost of work” means the sum of all costs necessarily incurred and paid by CONTRACTOR for labor, materials and equipment in the proper performance of extra work. Except as otherwise may be agreed to in writing by OWNER, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items and shall not include any of the excluded costs itemized in this Article.

11.3.2 Labor - The costs of labor will be the actual cost substantiated by certified payroll for wages prevailing for each craft or type of workers performing the extra work at the time the extra work is done, plus employer payments of payroll taxes, Workers’ Compensation insurance, liability insurance, health and welfare, pension, vacation, apprenticeship funds and other direct costs resulting from Federal, State or local laws, as well as assessments or benefits required by lawful collective bargaining agreements. Labor costs for equipment operators and helpers shall be paid only when such costs are not included in the invoice for equipment rental. The labor costs for foremen shall be proportioned to all of their assigned work and only that applicable to extra work shall be paid. Nondirect labor costs including the superintendent, Project manager and other labor identified in 11.3.7.1 shall be considered part of the overhead markup identified in this Article.

11.3.3 Materials - The cost of materials reported shall be itemized at invoice or lowest current price at which materials are locally available and delivered to the job in the quantities involved, plus the cost of sales tax, freight, delivery and storage.

11.3.3.1 Trade discounts available to the purchaser shall be credited to OWNER notwithstanding the fact that such discounts may not have been taken by CONTRACTOR.

11.3.3.2 For materials secured by other than a direct purchase and direct billing to the purchaser, the cost shall be deemed to be the price paid to the actual supplier as determined by OWNER.

11.3.3.3 Payment for materials from sources owned wholly or in part by the purchaser shall not exceed the price paid by the purchaser for similar materials from said sources on extra work items or the current wholesale price for such materials delivered to the work site, whichever price is lower.

4.a
Packet Pg. 105 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 38

11.3.3.4 If in the opinion of OWNER the cost of material is excessive, or CONTRACTOR does not furnish satisfactory evidence of the cost of such material, then the cost shall be deemed to be the lowest current wholesale price for the total quantity concerned delivered to the work site less trade discount.

11.3.3.5 OWNER reserves the right to furnish materials for the extra work and no claim shall be allowed by CONTRACTOR for costs and profit on such materials.

11.3.4 Equipment - CONTRACTOR will be paid for the use of equipment at the rental rate listed for such equipment specified in the Supplementary General Conditions. Such rental rate will be used to compute payments for equipment whether the equipment is under CONTRACTOR’s control through direct ownership, leasing, renting or another method of acquisition. The rental rate to be applied for use of each item of equipment shall be the rate resulting in the least total cost to OWNER for the total period of use. If it is deemed necessary by CONTRACTOR to use equipment not listed in the publication specified in the Supplementary General Conditions, an equitable rental rate for the equipment will be established by OWNER. CONTRACTOR may furnish cost data which might assist OWNER in the establishment of the rental rate.

11.3.4.1 All equipment shall, in the opinion of OWNER, be in good working condition and suitable for the purpose for which the equipment is to be used.

11.3.4.2 Before construction equipment is used on the extra work, CONTRACTOR shall plainly stencil or stamp an identifying number thereon at a conspicuous location, and shall furnish to OWNER, in duplicate, a description of the equipment and its identifying number and the scheduled work activities planned.

11.3.4.3 Unless otherwise specified, manufacturer’s ratings and manufacturer-approved modifications shall be used to classify equipment for the determination of applicable rental rates.

Equipment which has no direct power unit shall be powered by a unit of at least the minimum rating recommended by the manufacturer.

11.3.5 Rental Equipment

11.3.5.1 The rental time to be paid for equipment on the work site shall be the time the equipment is in productive operation on the extra work being performed and, in addition, shall include the time required to move the equipment to the location of the extra work and return it to the original location or to another location requiring no more time than that required to return it to its original location; except, that moving time will not be paid if the equipment is used on other than the extra work, even though located at the site of the extra work.

11.3.5.2 Rental time will not be allowed while equipment is inoperative due to breakdowns.

11.3.5.3 Computation Method - The following shall be used in computing the rental time of equipment on the work site.

4.a
Packet Pg. 106 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 39

11.3.5.3.1 When hourly rates are listed, any part of an hour less than thirty (30) minutes of operation shall be considered to be one-half (.5) hour of operation, and any part of an hour in excess of thirty (30) minutes will be considered one (1) hour of operation.

11.3.5.3.2 When daily rates are listed, any part of a Day less than four (4) hours operation shall be considered to be one-half (.5) Day of operation.

11.3.6 CONTRACTOR-Owned Equipment - For CONTRACTOR-owned equipment, the allowed equipment rental rate will be limited to the monthly equipment rental rate using a utilization rate of one hundred seventy-three (173) hours per month which is found in the Equipment Rental Rate Tables authorized by the Supplementary General Conditions for rental equipment.

11.3.7 Special Services Special work or services are defined as that work characterized by extraordinary complexity, sophistication or innovation or a combination of the foregoing attributes which are unique to the construction industry.

11.3.7.1 When OWNER and CONTRACTOR determine that a special service is required which cannot be performed by the forces of CONTRACTOR or those of any of its Subcontractors, the special service may be performed by an entity especially skilled in the work. Invoices for special services based upon the current fair market value thereof may be accepted without complete itemization of labor, material and equipment rental costs, after validation of market values by OWNER.

11.3.7.2 All invoices for special services will be adjusted by deducting all trade discounts offered or available, whether the discounts were taken or not. In lieu of the allowances for overhead and profit specified in this Article, herein, an allowance of fifteen (15) percent will be added to invoices for special services.

11.3.8 Excluded Costs - The term “cost of the work” shall not include any of the following costs:

11.3.8.1 Overhead Cost - Payroll costs and other compensation of CONTRACTOR’s officers, executives, principals (of partnership and sole proprietorships) general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, timekeepers, clerks and other personnel employed by CONTRACTOR whether at the site or in CONTRACTOR’s principal office, a branch office or material yard and shop for general administration of the Work or not specifically covered by this Article all of which are to be considered administrative costs covered by CONTRACTOR’s allowance for overhead and profit.

11.3.8.2 Office Expense - Expenses of CONTRACTOR’s principal and branch offices.

11.3.8.3 Capital Expenses - Any part of CONTRACTOR’s capital expenses, including interest on CONTRACTOR’s capital employed for the WORK and charges against CONTRACTOR for delinquent payments.

4.a
Packet Pg. 107 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 40

11.3.8.4 Premiums - Cost of premiums for all Bonds and for all insurance whether or not CONTRACTOR is required by the Contract Documents to purchase and maintain the same.

11.3.8.5 Negligence - Costs due to the negligence of CONTRACTOR, any Subcontractor or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of Defective Work, disposal of materials or equipment wrongly supplied and making good any damage to property.

11.3.8.6 Other - Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in this Article.

11.3.8.7 Small Tools - Cost of small tools valued at less than five hundred dollars ($500) and that remain the property of CONTRACTOR.

11.3.8.8 Administrative Costs - Costs associated with the preparation of Change Orders (whether or not ultimately authorized), cost estimates or the preparation or filing of claims.

11.3.8.9 Anticipated Lost Profits - Expenses of CONTRACTOR associated with anticipated lost profits or lost revenues, lost income or earnings, lost interest on earnings or unpaid retainage.

11.3.8.10 Home Office Overhead - Costs derived from the computation of a home office overhead rate by application of the Eichleay, Allegheny, Burden Fluctuation or other similar methods.

11.3.8.11 Special Consultants and Attorneys - Costs of special consultants or attorneys, whether or not in the direct employ of CONTRACTOR, employed for services specifically related to the resolution of a claim, dispute or other matter relating to the acceptability of the Work.

11.3.9 CONTRACTOR’s Extra Work Report - In order to be paid for extra work based on time and materials, CONTRACTOR must submit a daily Extra Work Report on a form provided by OWNER. The form must be completely filled out based on the provisions of this Article and signed by CONTRACTOR and OWNER at the end of each work Day. Failure to complete the form and obtain appropriate signatures by the next working Day after the work was completed will result in CONTRACTOR’s costs for extra work being disallowed until such form is completed and agreed to by OWNER. Delay in submitting the form beyond seven (7) Days will result in OWNER’s records becoming the official record for payment purposes.

11.4 COSTS RELATING TO WEATHER DAMAGE

CONTRACTOR shall have no cost claims against OWNER for damages for any injury to work, materials or equipment, resulting from the action of the elements or weather. Weather-related adjustment to Contract Time will be made in accordance with Article 12.

11.5 WRITTEN JUSTIFICATION SUBSTANTIATING ADJUSTMENT

4.a
Packet Pg. 108 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 41

11.5.1 CONTRACTOR Initiated Change - Any request by CONTRACTOR for a change in the Contract Price shall be based on written notice delivered by CONTRACTOR to OWNER promptly (but in no event later than seven (7) Days) after the start of the occurrence or the event giving rise to the request for adjustment and stating the general nature of the request.

11.5.2 Cost and Time Notice Requirements - Notice of the amount of the request for adjustment in cost and/or time with supporting data shall be delivered within fourteen (14) Days after such start of occurrence, unless OWNER allows an additional period of time to ascertain more accurate data in support of the request.

11.5.3 Proposal Form - CONTRACTOR’s proposal shall be on forms acceptable to OWNER.

CONTRACTOR proposal request shall certify in writing that the amounts included cover all direct, supplemental, indirect, consequential and cumulative costs and delays, as applicable, and that those costs and delays would be or were necessarily incurred, despite CONTRACTOR’s reasonable and diligent efforts to mitigate them. Mitigation efforts undertaken by CONTRACTOR should be described.

11.5.4 Proposal Content - Where the change in Contract Price is to be determined on the basis of the cost of the work involved, CONTRACTOR’s itemized estimates shall detail all applicable elements of cost, including, but not limited to, labor hours and payroll costs, quantities, crew mixes, production rates, material costs, Subcontractor and Supplier costs, equipment costs and supplemental costs. Where the change in Contract Price arises from changes in the schedule of all or part of the WORK, or where a change in Contract Time is sought, the submittal shall include analysis required by Article 12. With respect to work during other than normal hours, the labor charges associated with such work shall consist of straight time wages and burden plus the appropriate overtime or shift premium with no additional burden (i.e., fringe benefits) on the premium portion.

11.5.5 Additions and Deletions - The submittal shall cover all aspects of the work involved, whether relating to deleted, added, revised or impacted items of Work. Amounts for Subcontractors or Suppliers at any tier shall be similarly supported.

11.5.6 Requirements for Valid Proposal - No submittal for an adjustment in Contract Price or Contract Time shall be valid unless submitted in accordance with this Article.

11.5.7 Obligation of Surety - All work performed hereunder shall be subject to all of the provisions of the Contract Documents and CONTRACTOR’s sureties shall be bound with reference thereto as under the Agreement. Copies of all amendments to surety Bonds or supplemental surety Bonds shall be submitted to OWNER when requested.

11.5.8 Documentation - CONTRACTOR is required to comply with OWNER’s documentation requirements regarding format and level of detail for the Change Order process.

11.6 OWNER RIGHT TO DIRECT USE OF COMPETITIVE BID - OWNER reserves the right to direct CONTRACTOR to solicit competitive bids for additional work. If required by

4.a
Packet Pg. 109 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 42 OWNER, CONTRACTOR shall obtain competitive bids from Subcontractors acceptable to CONTRACTOR and shall deliver such bids to OWNER who will then determine, with the advice of OWNER, which bids will be accepted.

ARTICLE 12 -- CHANGE OF CONTRACT TIME

12.1 GENERAL

12.1.1 CONTRACTOR Request For Time Extension - The Contract Time may only be changed by a Change Order or Field Order. Any request by CONTRACTOR for an extension of the Contract Time (or Milestones) shall be based on written notice delivered by CONTRACTOR to OWNER promptly (but in no event later than seven (7) Days) after the occurrence of the event giving rise to the request and stating the general nature of the request, unless otherwise noted.

Notice of the extent of the request with supporting data shall be delivered within fourteen (14) Days after such occurrence (unless OWNER allows an additional period of time to ascertain more accurate data in support of the request) and shall be accompanied by CONTRACTOR’S written statement that the adjustment requested is the entire time adjustment to which CONTRACTOR has reason to believe it is entitled as a result of the occurrence of said event. An increase in Contract Time does not mean that CONTRACTOR is due an increase in Contract Price.

12.1.2 CONTRACTOR Required Analysis - An extension in Contract Time will not be granted unless CONTRACTOR can demonstrate through an analysis of the Critical Path Method Progress Schedule critical path that the increases in the time to perform or complete the WORK, or specified part of the WORK, beyond the corresponding Contract Time arise from unforeseeable causes beyond the control and without the fault or negligence of both CONTRACTOR and his Subcontractors, Suppliers or other persons or organizations, and that such causes in fact lead to performance or completion of the WORK, or specified part in question, beyond the corresponding Contract Time, despite CONTRACTOR’s reasonable and diligent actions to guard against those effects.

12.1.3 OWNER’s Right To Grant Time Extension - OWNER may elect, at its sole discretion, to grant an extension in Contract Time, without CONTRACTOR’s request, because of delays or other factors.

12.2 TIME IS OF THE ESSENCE - With regard to all Milestones and all time limits stated in the Contract Documents, time is of the essence.

12.3 CRITERIA FOR DETERMINING ADJUSTMENTS IN CONTRACT TIME

12.3.1 Use Of Float and Critical Path - Use of float is in accordance with the SPECIAL PROVISIONS.

12.3.2 Types Of Delays Beyond CONTRACTOR’s and OWNER’S Control - Delays beyond the control of CONTRACTOR shall include, but not be limited to, acts or neglect by OWNER, acts or neglect of utility owners, fires, floods, epidemics, abnormal weather conditions, labor

4.a
Packet Pg. 110 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 43 slowdowns and strikes or acts of God. CONTRACTOR must provide OWNER written notice of the potential delay within twenty-four (24) hours of the occurrence.

12.3.3 Subcontractor Delays Within CONTRACTOR Control - Delays attributable to and within the control of Subcontractor or Supplier shall be deemed to be delays within the control of CONTRACTOR. No time extension will be allowed for such delays.

12.4 TIME ONLY ENTITLEMENT

12.4.1 - Where CONTRACTOR is prevented from completing any part of the WORK within the Contract Time (or Milestones) due to delay to a critical path activity beyond the control of both OWNER and CONTRACTOR, an extension of the Contract Time (or Milestones) in an amount equal to the time lost on the critical path of the Project due to such delay shall be CONTRACTOR’s sole and exclusive remedy for such delay.

12.4.2 - In no event shall OWNER be liable to CONTRACTOR, any Subcontractor, any Supplier or any other person or organization, or to any surety for or employee or agent of any of them, for damages arising out or resulting from (i) delays caused by or within the control of CONTRACTOR, or (ii) delays beyond the control of both parties including but not limited to fires, floods, epidemics, abnormal weather conditions, acts of God or acts or neglect by utility owners or other contractors performing other work as contemplated by Article 7. CONTRACTOR must provide OWNER written notice of the potential delay within twenty-four (24) hours of the occurrence.

12.5 EXTENSIONS OF TIME FOR DELAY DUE TO WEATHER - An inclement weather delay is defined as a delay caused by inclement weather which prevents CONTRACTOR from working on the controlling item in CONTRACTOR’s construction schedule. Should CONTRACTOR experience inclement weather delays over the course of contract duration in excess of the number of Days outlined in the Supplementary General Conditions, CONTRACTOR shall be granted a time extension in accordance with the provisions outlined in this Article. The time extension shall be based on the number of inclement weather Days in excess of the number of Days outlined in the Supplementary General Conditions.

12.5.1 Extension of Time For Delays due to Weather Damage - If, however, in the opinion of OWNER, CONTRACTOR has made all reasonable efforts to protect the materials, equipment and work, CONTRACTOR may be granted a reasonable extension of Contract Time to make proper repairs, renewals and replacements of the work, materials or equipment in accordance with Article

12. ARTICLE 13 -- TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK; WARRANTY AND GUARANTEE

13.1 TESTS AND INSPECTIONS

13.1.1 ACCESS TO WORK FOR TESTING AND INSPECTION - OWNER, OWNER, their consultants, Sub-Consultants other representatives and personnel of OWNER, independent testing

4.a
Packet Pg. 111 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 44 laboratories and governmental agencies with jurisdictional interests will have access to the WORK at reasonable times for their observation, inspecting and testing. CONTRACTOR shall provide them proper and safe conditions for such access and advise them of CONTRACTOR’s Safety procedures and programs so that they may comply.

13.1.2 Cost of Inspection/Notice - OWNER will make, or have made, such inspections and tests as OWNER deems necessary to see that the WORK is being accomplished in accordance with the requirements of the Contract Documents. Unless otherwise specified, the cost of such inspection and testing will be borne by OWNER. In the event such inspections or tests reveal non-compliance with the requirements of the Contract Documents, CONTRACTOR shall bear the cost of corrective measures deemed necessary by OWNER, as well as the cost of subsequent re-inspection and re-testing.

Neither observations by OWNER nor inspections, tests or approvals by others shall relieve CONTRACTOR from CONTRACTOR’s obligation to perform the WORK in accordance with the Contract Documents.

CONTRACTOR shall give OWNER timely notice as specified in the technical specification or five (5) Days if not identified of readiness of the WORK for all required on and off site inspections, tests or approvals, and shall cooperate with inspection and testing personnel to facilitate required inspections or tests.

OWNER shall provide for the services of an independent testing laboratory to perform inspections, tests or approvals required by the Contract Documents except as otherwise specifically provided.

CONTRACTOR shall be responsible for arranging any inspection required by a public entity.

CONTRACTOR shall provide adequate notice to the public entity and to OWNER for any required inspection.

13.1.3 Right to Stop Work - OWNER has the right to stop or suspend work activities which will cover CONTRACTOR work product which is to be inspected or tested, or which will interfere with the inspection or testing activities, for a reasonable time and CONTRACTOR will have no right to additional cost or time he may incur as a result of the work stoppage.

13.2 CONTRACTOR INSPECTION AND TESTING RESPONSIBILITY

13.2.1 - CONTRACTOR shall be responsible for performance of tests and inspections in accordance with the SPECIAL PROVISIONS.

13.2.2 If laws or regulations of any public body having jurisdiction other than OWNER require any work to specifically be inspected, tested or approved, CONTRACTOR shall pay all costs.

13.2.3 CONTRACTOR shall be responsible for and shall pay all costs in connection with any inspection or testing required in connection with OWNER’s or OWNER’s acceptance of a Supplier of materials or equipment proposed as a substitution or “or-equal” to be incorporated in the

4.a
Packet Pg. 112 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 45 WORK, or of materials or equipment submitted for review prior to CONTRACTOR’s purchase thereof for incorporation in the WORK.

13.2.4 CONTRACTOR shall pay all related costs, schedule related activities at appropriate times and secure and furnish for OWNER the required certificates of inspection, testing or approval.

Any associated cost and time required by CONTRACTOR for inspections required under Article

13.2 shall be considered as having been included in the Contract Price and in CONTRACTOR’s schedule for the performance of the WORK within the Contract Time.

13.2.5 All inspections, tests or approvals other than those required by laws or regulations of any public body having jurisdiction shall be performed by organizations acceptable to OWNER.

13.2.6 CONTRACTOR shall anticipate at a minimum the following testing and inspection requirements over and above those required by the Contract Documents:

Civil Engineering Inspections/Reviews

1. All form work

2. Concrete placement

3. Street cleanliness/sweeping after cold mill and before ARAM installation

4. ARAM installation

5. Asphalt compaction

6. Class II Base compaction

7. Remove and Replace areas (if needed)

8. Street cat-tracking prior to final paint striping

13.3 COVERING WORK TO BE INSPECTED

13.3.1 Covered Work Prior To Inspection Or Testing - If any WORK (including the work of others) that is to be inspected, tested or approved is covered without written concurrence of OWNER, it must, when requested by OWNER, be uncovered for inspection. CONTRACTOR shall bear all direct, indirect, and consequential costs and damages of such uncovering, unless CONTRACTOR has given OWNER and/or agencies timely notice of CONTRACTOR’s intention to cover the same, and OWNER has not acted with reasonable promptness in response to such notice.

13.3.2 Covered Work Contrary To Written Request - If any WORK is covered contrary to the written request of OWNER, it must, when requested by the OWNER, be uncovered for OWNER’s observation and recovered. CONTRACTOR shall bear all direct, indirect and consequential costs and damages of such uncovering.

4.a
Packet Pg. 113 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 46

13.3.3 OWNER Right to Direct That Work Be Uncovered For Inspection Or Testing

13.3.3.1 If OWNER considers it necessary or advisable that covered work be observed by OWNER or inspected or tested by others, CONTRACTOR, at OWNER’s request, shall uncover, expose or otherwise make available for observation, inspection or testing as OWNER may require, that portion of the WORK in question, furnishing all necessary labor, material and equipment.

13.3.3.2 If it is found that such WORK is defective, CONTRACTOR shall bear all direct, indirect and consequential costs and damages of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction, including but not limited to fees and charges of engineers, architects, attorneys and other professionals. However, if such work is not found to be defective, CONTRACTOR shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction based on the time and materials provisions as outlined in Article 11.

13.4 OWNER MAY STOP THE WORK - If the WORK is determined to be defective by OWNER, and CONTRACTOR fails to immediately correct the defect or CONTRACTOR fails to perform WORK in such a way that the completed WORK will conform to the Contract Documents, OWNER may order CONTRACTOR to stop the WORK, or any portion thereof, until the cause for such order has been eliminated; however, this right of OWNER to stop the WORK shall not give rise to any duty on the part of OWNER or OWNER to exercise this right for the benefit of CONTRACTOR or any other party. CONTRACTOR shall bear all direct, indirect and consequential costs and damages that result from this stop work notice.

13.5 CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK

13.5.1 CONTRACTOR’s Responsibility - If required by OWNER, CONTRACTOR shall promptly, either correct all Defective Work, whether or not fabricated, installed or completed, or, if the WORK has been rejected by OWNER, remove it from the site and replace it with nonDefective Work. CONTRACTOR shall bear all direct, indirect and consequential costs and damages of such correction or removal.

13.5.2 OWNER Acceptance of Defective Work - If, instead of requiring correction or removal and replacement of Defective Work, OWNER prefers to accept the WORK, OWNER may do so.

CONTRACTOR shall bear all direct, indirect and consequential costs attributable to OWNER’s evaluation of and determination to accept such Defective Work. If any such acceptance occurs prior to Final Payment, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the WORK, and OWNER shall be entitled to an appropriate decrease in the Contract Price, determined by OWNER and charged to CONTRACTOR through a deductive Change Order.

13.5.3 OWNER May Correct Defective Work

4.a
Packet Pg. 114 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 47

13.5.3.1 If CONTRACTOR after receiving written notice, from OWNER or from OWNER, or both, fails within a reasonable time as specified in the notice, to correct Defective Work or to remove and replace rejected WORK, OWNER may correct and remedy any such deficiency. If CONTRACTOR after receiving written notice from OWNER or OWNER, or both, fails within reasonable time as specified in the notice, to perform the WORK in accordance with the Contract Documents, or fails to comply with any other provision of the Contract Documents, OWNER may correct and remedy any such deficiency.

13.5.3.2 In exercising the rights and remedies under this paragraph OWNER shall proceed expeditiously.

13.5.3.3 In connection with such corrective and remedial action, OWNER may exclude CONTRACTOR from all or part of the site, take possession of all or part of the WORK, and suspend CONTRACTOR’s services related thereto, take possession of CONTRACTOR’s tools, appliances, construction equipment and machinery at the site and incorporate in the Work all materials and equipment stored at the site or for which OWNER has paid CONTRACTOR but which are stored elsewhere.

13.5.3.4 CONTRACTOR shall allow OWNER, Engineers, Agents and employees, OWNER’s other contractors, OWNER and OWNER access to the site to enable OWNER to exercise the rights and remedies under this paragraph.

13.5.3.5 All claims, costs, losses and damages incurred or sustained by OWNER in exercising such rights and remedies will be charged against CONTRACTOR and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the WORK, and OWNER shall be entitled to an appropriate decrease in the Contract Price, and, if the parties are unable to agree as to the amount thereof, OWNER may unilaterally issue the Change Order through OWNER.

13.5.3.6 Such claims, costs, losses and damages will include but not be limited to all costs of repair or replacement of work of others destroyed or damaged by correction, removal or replacement of CONTRACTOR’s Defective Work.

13.5.3.7 CONTRACTOR shall not be allowed an extension of the Contract Time (or Milestones) because of any delay in the performance of the WORK attributable to the exercise by OWNER of OWNER’s rights and remedies hereunder.

13.6 WARRANTY AND GUARANTEE

13.6.1 General - CONTRACTOR warrants and guarantees to OWNER that all work will be in accordance with the Contract Documents and will not be defective. Prompt notice of defects known to OWNER or OWNER shall be given to CONTRACTOR. All Defective Work, whether or not in place, may be rejected, corrected or accepted as provided in this Article 13. Defective Work may be rejected even if approved by prior inspection.

4.a
Packet Pg. 115 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 48

13.6.2 One (1) Year Warranty Period - The warranty period shall commence when the Notice of Completion is issued, at notice of Beneficial Occupancy or at notice of Partial Utilization of the work to be warranted has been issued, or a later date if so specified in the Agreement, or mutually agreed to, and extend until one (1) year after that date or whatever longer period may be prescribed by laws or regulations or by the terms of any applicable special guarantee or specific provision of the Contract Documents.

13.6.3 Correction of Defective Work - If within the designated warranty period, or such longer period as may be required by Laws or Regulations, the WORK, or any part of the WORK, is discovered to be defective, CONTRACTOR shall promptly, without an adjustment in Contract Price and in accordance with OWNER’s or OWNER’s written instructions, either correct that Defective Work, or if it has been rejected by OWNER or OWNER, remove it from the site and replace it with non-Defective Work. If circumstances warrant it, including but not limited to, in an emergency, OWNER or OWNER may have the Defective Work corrected or the rejected WORK removed and replaced. In that event, CONTRACTOR shall not be allowed to recover any associated costs, and he shall reimburse OWNER for all direct, indirect and consequential costs of OWNER, and OWNER shall be entitled to an appropriate decrease in Contract Price, to withhold a set-off against amount recommended for payment, or make a claim on CONTRACTOR’s bond if CONTRACTOR has been paid in full. Where Defective Work (and damage to other WORK resulting therefrom) has been corrected, removed or replaced during the warranty period, the one (1) year warranty period with respect to such WORK will be extended for an additional period of one (1) year after such correction or removal and replacement has been satisfactorily completed.

13.6.4 Early Completion - The one (1) year warranty period will not begin until the Notice of Completion is filed. If CONTRACTOR completes the WORK or portions thereof prior to this time, he shall preserve the equipment and/or facilities by developing and implementing a preventive maintenance program in compliance with manufacturer’s recommendations to maintain the equipment and/or facilities unless OWNER has issued a notice of Beneficial Occupancy or notice of Partial Utilization for the warranted WORK. At start up, CONTRACTOR will be required to get his equipment and/or facilities ready to put into service.

13.7 EXTENDED WARRANTIES AND GUARANTEES - OWNER may at its sole discretion extend the one (1) year warranty period up to twenty-four (24) months, in which case CONTRACTOR shall maintain the warranties and guarantees. If such extension of the one (1) year warranty period causes an increase in the cost of the warranties and guarantees provided by CONTRACTOR, an adjustment in Contract Price shall be made as provided by the Contract Documents.

13.7.1 Extended Warranties and Guarantees - OWNER may extend the one (1) year Warranty period for up to twenty-four (24) additional months.

ARTICLE 14 -- PAYMENTS TO CONTRACTOR AND COMPLETION

14.1 BASIS FOR PAYMENT

14.1.1 Lump Sum Items

4.a
Packet Pg. 116 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 49

14.1.1.1 General - Items for which quantities are indicated as Lump Sum shall be paid for at the price indicated in the Bid. Such payment shall be full compensation for the items of WORK and all work appurtenant thereto.

14.1.1.2 Critical Path Method (“CPM”) Schedule Used For Payment - Payment for all lump sum costs and services shall be based on the value of WORK accomplished. The allocation of cost to CPM schedule activities will be utilized for payment computation.

14.1.1.3 Critical Path Method Schedule Required - CONTRACTOR shall submit to OWNER a detailed cost loaded and manpower loaded CPM schedule, to be used as a basis for determining progress payments in accordance with the General Requirements.

14.1.2 Unit Priced Items

14.1.2.1 General - Unit price items will be paid for based on equivalent quantities installed or performed. Unless otherwise specified, quantities of WORK shall be determined from measurements or dimensions in horizontal planes. However, linear quantities of pipe, piling, fencing and timber shall be considered as being the true length measured along the longitudinal axis. Unless otherwise provided in the Specifications, volumetric quantities shall be the product of the mean area of vertical or horizontal sections and the intervening horizontal or vertical dimension. CONTRACTOR and OWNER will agree on the unit quantity to be used for payment prior to its installation or removal when possible, or immediately after installation.

14.1.2.2 Methods of Measurement - Materials and items of WORK which are to be paid for on the basis of measurement shall be measured in accordance with the methods stipulated in the particular sections involved.

14.1.2.3 Certified Weight - When payment is to be made on the basis of weight, the weighing shall be done on certified platform scales or, when approved by OWNER, on a completely automated weighing and recording system. CONTRACTOR shall furnish OWNER with duplicate licensed weighmaster’s certificates showing the actual net weights.

14.1.2.4 Units of Measurement - Measurements shall be in accordance with U.S. standard measures. A pound is an avoirdupois pound. A ton is two thousand (2,000) pounds avoirdupois.

The unit of liquid measure is the U.S. gallon.

14.2 PAYMENT

14.2.1 Wasted Or Rejected Material - Payment will not be made for materials wasted or disposed of in a manner not called for in the Contract Documents. This includes rejected material not unloaded from vehicles, material rejected after it has been placed and material placed outside of the plan lines. No compensation will be allowed for disposing of rejected or excess materials.

14.2.2 CONTRACTOR Retains Ownership - Payment shall not relieve CONTRACTOR from its obligations under the Agreement, nor shall such payment be construed to be acceptance of any

4.a
Packet Pg. 117 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 50 of the WORK. Payment shall not be construed as the transfer of ownership of any equipment or materials to OWNER. Responsibility of ownership shall remain with CONTRACTOR who shall be obligated to store, protect, repair, replace, rebuild or otherwise restore any fully or partially completed WORK or structure for which payment has been made, or replace any materials or equipment required to be provided under the Agreement which may be damaged, lost, stolen or otherwise degraded in any way prior to final acceptance of the WORK.

14.2.3 Payment Does Not Affect Warranty - Guarantee and warranty periods shall not be affected by any payment but shall commence as specified in Article 13.6.2.

14.2.4 Stop Notice - If, within the time fixed by law, a properly executed notice to stop payment is filed with OWNER, due to CONTRACTOR’s failure to pay for labor or materials used in the WORK, all money due for such labor or materials will be withheld from payment to CONTRACTOR in accordance with applicable laws.

14.3 APPLICATION FOR PROGRESS PAYMENT

14.3.1 Payment Due Date - CONTRACTOR shall, on the payment application date designated by OWNER, submit to OWNER for review, an Application for Payment filled out and signed by CONTRACTOR covering the WORK completed as of the date of the application and accompanied by such supporting documentation as is required by the General Requirements.

14.3.2 Payment Application Content - The Application for Payment shall identify, as a subtotal, the amount of CONTRACTOR’s total earnings to date, plus the value of materials stored at the site which have not yet been incorporated in the WORK, and less a deductive adjustment for materials previously paid. Payment for such material shall not be construed as acceptance of the material.

14.3.3 Net Payment - The net payment due CONTRACTOR shall be the above-mentioned subtotal from which shall be deducted retainage and the total amount of all previous payments made to CONTRACTOR.

14.3.4 Retention - A retention of five (5) percent of each approved progress payment will be withheld until the work is fifty (50) percent complete; then OWNER may, at its option, refund that portion of retainage held by OWNER that is in excess of five (5) percent of the total of the WORK done to date and thereafter continue to retain five (5) percent of the value of all approved progress payment requests subsequently submitted. When the Notice of Completion is issued, OWNER at its option, may refund any portion of the remaining retention.

14.3.5 Retainage From Payments - CONTRACTOR may elect to receive one hundred (100) percent of payments due under the Contract Documents from time to time, without retention of any portion of the payment by OWNER, by depositing securities of equivalent value with OWNER in accordance with the provisions of section 22300 of the Public Contract Code. Such securities, if deposited by CONTRACTOR, shall be valued by OWNER, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in section 16430 of the Government Code, bank or savings and loan certificates of

4.a
Packet Pg. 118 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 51 deposit, interest-bearing demand deposit accounts, standby letters of credit or any other security mutually agreed to by CONTRACTOR and OWNER.

14.3.6 Reinstating Retention - OWNER may reinstate up to five (5) percent retention of the total of the WORK done if OWNER determines, at its discretion, that CONTRACTOR is not performing the WORK satisfactorily or there is other specific cause for such withholding.

14.3.7 Products Stored On and Off Site - Storage and payment for material supplies and/or equipment which will be incorporated into the WORK shall be in accordance with the provisions of the General Requirements.

14.4 CONTRACTOR’S WARRANTY OF TITLE - CONTRACTOR warrants and guarantees that title to all work, materials and equipment covered by an Application for Payment, whether incorporated in the WORK or not, will pass to OWNER at the time of Final Payment free and clear of all liens.

14.5 APPLICATIONS FOR PROGRESS PAYMENT - Thirty (30) Days after presentation of undisputed and properly submitted Application for Payment, the amount will become due and when due will be paid by OWNER to CONTRACTOR.

Any payment request that is disputed or determined to be improper shall be returned to CONTRACTOR not later than seven (7) Days after receipt accompanied by documentation describing the reason(s) why the payment request is not proper.

Any progress payment not made within thirty (30) Days of an undisputed and properly submitted payment request will require OWNER to pay interest as provided by Public Contract Code section 20104.50.

14.6 REJECT PAYMENT FOR DEFECTIVE WORK - OWNER may also refuse to recommend any such payment, or, because of subsequently discovered evidence or the results of subsequent inspections or tests, nullify any such payment previously recommended, to such extent as may be necessary in OWNER’s opinion to protect OWNER from loss because:

14.6.1 The WORK is defective, or completed WORK has been damaged requiring correction or replacement,

14.6.2 The Contract Price has been reduced by written amendment or Change Order,

14.6.3 OWNER has been required to correct Defective Work or complete WORK in accordance with Article 13.

14.6.4 OWNER has actual knowledge of the occurrence of any of the events enumerated in Article

15. 14.7 REJECTION OF PAYMENT BY OWNER - OWNER may refuse to make payment of the full amount recommended by OWNER because claims have been made against OWNER on

4.a
Packet Pg. 119 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 52 account of CONTRACTOR’s performance of the WORK or liens have been filed in connection with the WORK or there are other items entitling OWNER to a credit against the amount recommended, but OWNER must give CONTRACTOR written notice within seven (7) Days (with a copy to OWNER) stating the reasons for such action.

14.8 SUBSTANTIAL COMPLETION

14.8.1 When CONTRACTOR considers the WORK ready for its intended use CONTRACTOR shall notify OWNER in writing that the WORK is substantially complete. CONTRACTOR shall attach to this notice a list of all work items that remain to be completed.

14.8.2 Within a reasonable time thereafter, OWNER, CONTRACTOR and OWNER shall make an inspection of the WORK to determine the status of completion.

14.8.3 If OWNER does not consider the WORK substantially complete, or the list of remaining work items to be comprehensive, OWNER will notify CONTRACTOR in writing giving the reasons therefore.

14.8.4 If OWNER considers the WORK substantially complete, OWNER will prepare and deliver to OWNER a notice of Substantial Completion, which shall fix the date of Substantial Completion.

There shall be attached to the certificate a tentative list of items to be completed or corrected before Final Payment. At the time of delivery of the notice of Substantial Completion, OWNER will deliver to OWNER and CONTRACTOR a written recommendation as to division of responsibilities pending Final Payment between OWNER and CONTRACTOR with respect to security, operation, Safety, maintenance, heat, utilities, insurance and warranties and guarantees.

14.8.5 OWNER shall have the right to exclude CONTRACTOR from the WORK after the date of Substantial Completion, but OWNER shall allow CONTRACTOR reasonable access to complete or correct items on the list of remaining WORK items, or for warranty work.

14.9 PARTIAL UTILIZATION AND BENEFICIAL OCCUPANCY

14.9.1 Partial Utilization - OWNER shall have the right to utilize or place into service any item of equipment or other usable portion of the WORK which is substantially complete prior to completion of all of the WORK. Whenever OWNER plans to exercise said right, CONTRACTOR will be notified in writing with a notice of Partial Utilization signed by OWNER identifying the specific portion or portions of the WORK to be so utilized or otherwise placed into service.

Liquidated damages will not be affected.

14.9.2 Beneficial Occupancy - OWNER shall have the right to take control of the entire WORK if it is substantially completed. Whenever OWNER plans to exercise said right CONTRACTOR will be notified in writing with a notice of Beneficial Occupancy. Such use by OWNER will terminate liquidated damages.

4.a
Packet Pg. 120 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 53

14.9.3 Responsibility For Care and Maintenance - It shall be understood by CONTRACTOR that until Beneficial Occupancy or Partial Utilization notices are issued or start up begins, all responsibility for care and maintenance of all of the WORK shall be the responsibility of CONTRACTOR. Upon issuance of said written notice of Beneficial Occupancy or notice of Partial Utilization, OWNER will accept responsibility for the protection and maintenance of all such items or portions of the WORK described in the written notice.

14.9.4 CONTRACTOR Responsible For Completion - CONTRACTOR shall retain full responsibility for satisfactory completion of the WORK, regardless of whether a portion thereof has been partially utilized by OWNER.

14.10 FINAL INSPECTION - Upon written notice from CONTRACTOR that the entire WORK or an agreed portion thereof is complete, OWNER will make a final inspection with OWNER and CONTRACTOR and will notify CONTRACTOR in writing of all particulars in which this inspection reveals that the WORK is incomplete or defective. CONTRACTOR shall immediately take such measures as are necessary to complete such WORK or remedy such deficiencies.

14.11 FINAL APPLICATION FOR PAYMENT - After CONTRACTOR has completed all of the remaining work items referred to in Article 14, removed all temporary structures and utilities, cleared the site, delivered all maintenance and operating instructions, schedules, guarantees, Bonds, certificates of inspection, marked-up record documents and other documents, all as required by the Contract Documents, and after OWNER has indicated that the WORK is acceptable, CONTRACTOR may make application for Final Payment following the procedure for progress payments. The final Application for Payment shall be accompanied by all documentation called for in the Contract Documents, together with complete and legally effective releases or waivers satisfactory to OWNER of all liens arising out of or filed in connection with the WORK.

If CONTRACTOR has specific claims outstanding he shall restate these claims by stating the nature of the claim, the basis for entitlement and the estimated value of the claim. CONTRACTOR shall specifically release OWNER from any other claims not renewed.

14.12 FINAL PAYMENT AND ACCEPTANCE

14.12.1 If, on the basis of OWNER’s observation of the WORK during construction and final inspection, and OWNER’s review of the final Application for Payment and accompanying documentation, all as required by the Contract Documents, OWNER is satisfied that the WORK has been completed and CONTRACTOR’s other obligations under the Contract Documents have been fulfilled, OWNER will, within fourteen (14) Days after receipt of the final Application for Payment, indicate in writing OWNER’s recommendation of payment and present the Application for Payment to OWNER for payment. OWNER will also prepare a Notice of Completion.

14.12.2 After acceptance of the WORK by OWNER, OWNER will make Final Payment to CONTRACTOR of the amount remaining after deducting all prior payments and all amounts to be kept or retained under the provisions of the Contract Documents. OWNER will sign the Notice of Completion and file the Notice of Completion with the County Recorder.

14.13 LIQUIDATED DAMAGES

4.a
Packet Pg. 121 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 54

14.13.1 - Failure of CONTRACTOR to complete the WORK within the time allowed will result in damages being sustained by OWNER. For each consecutive calendar Day in excess of the time specified for completion of the WORK, CONTRACTOR shall pay to OWNER, or have withheld from monies due it, the sum provided for in the Contract Documents.

14.13.2 Execution of the Agreement shall constitute agreement by OWNER and CONTRACTOR that specified liquidated damages is the minimum value of the costs and actual damage caused by failure of CONTRACTOR to complete the WORK within the allotted time; that such sum is liquidated damages and shall not be construed as a penalty, and that such sum will be deducted from Final Payment due CONTRACTOR if such delay in completion occurs.

14.14 PARTIAL RELEASE OF RETENTION AT SUBSTANTIAL COMPLETION - If, through no fault of CONTRACTOR, final completion of the WORK is significantly delayed and if OWNER so confirms, OWNER shall, upon receipt of CONTRACTOR’s final Application for Payment and recommendation of OWNER, and without terminating the Agreement, make payment of the balance due for that portion of the WORK fully completed and accepted. If the remaining balance to be held by OWNER for WORK not fully completed or corrected is less than the retainage stipulated in the Agreement, and if Bonds have been furnished as required in Article 5, the written consent of the surety to the payment of the balance due for that portion of the WORK fully completed and accepted shall be submitted by CONTRACTOR to OWNER with the Application for such payment. Such payment shall be made under the terms and conditions governing Final Payment, except that it shall not constitute a waiver of claims.

14.15 WAIVER OF CLAIMS - The making and acceptance of Final Payment will constitute:

14.15.1 OWNER - A waiver of all claims by OWNER against CONTRACTOR, except claims arising from unsettled liens, from Defective Work appearing after final inspection pursuant to Article 14, from failure to comply with the Contract Documents or the terms of any special guarantees specified therein, or from CONTRACTOR’s continuing obligations under the Contract Documents; and

14.15.2 CONTRACTOR - A waiver of all claims by CONTRACTOR against OWNER other than those previously made in writing and still unsettled and specifically renewed in the Application for Payment.

14.16 RELEASE OF RETAINAGE AND OTHER DEDUCTIONS - After executing the necessary documents to initiate the lien period, and not more than thirty-five (35) Days thereafter (based on a thirty (30) Day lien filing period and five (5) Day processing time), OWNER will release to CONTRACTOR the retainage funds withheld pursuant to the Agreement, less any deductions to cover pending third-party claims and liquidated damages against CONTRACTOR.

14.17 CONTRACTOR’S CONTINUING OBLIGATION - CONTRACTOR’s obligation to perform and complete the WORK in accordance with the Contract Documents shall be absolute.

Neither recommendation of any progress or Final Payment by OWNER, nor the issuance of a Notice of Completion, nor any payment by OWNER to CONTRACTOR under the Contract

4.a
Packet Pg. 122 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 55 Documents, nor any use or occupancy of the WORK or any part thereof by OWNER, nor any act of acceptance by OWNER nor any failure to do so, nor any review of a Shop Drawing or sample submittal, will constitute an acceptance of work not in accordance with the Contract Documents or a release of CONTRACTOR’s obligation to perform the WORK in accordance with the Contract Documents.

14.18 TERMINATION OF LIABILITY OF OWNER - The acceptance by CONTRACTOR of final payment referred to in Article 14 herein, shall be a release of OWNER and OWNER from all claims of liability to CONTRACTOR for anything done or furnished for, or relating to, the WORK or for any act or neglect of OWNER or of any person relating to or affecting the WORK, except demands against OWNER for the remainder, if any, of the amounts kept or retained under the provisions of Article 14 herein; and excepting pending, unresolved claims renewed with the final Application for Payment.

ARTICLE 15 -- SUSPENSION OF WORK AND TERMINATION

15.1 SUSPENSION OF WORK BY OWNER - OWNER, acting through OWNER, may, at any time and without cause, suspend the WORK or any portion thereof for a period of not more than ninety (90) Days by notice in writing to CONTRACTOR. CONTRACTOR shall resume the WORK on receipt from OWNER of a notice of resumption of WORK. CONTRACTOR may submit a request for a change in the Contract Price or of the Contract Time, or both, directly attributable to the suspension as provided in Articles 11 and 12.

15.2 ARCHAEOLOGICAL AND PALEONTOLOGICAL DISCOVERIES

15.2.1 If a discovery is made of an archaeological or paleontological interest, CONTRACTOR shall immediately cease operations in the area of the discovery and shall not continue until ordered by OWNER. This suspension of work may exceed the ninety (90) Day limit without creating a CONTRACTOR right to terminate the Agreement. When resumed, operations within the area of the discovery shall be as directed by OWNER.

15.2.2 Discoveries which may be encountered may include, but not be limited to, dwelling sites, stone implements or other artifacts, animal bones, human bones, fossils or any item with culturally significance.

15.2.3 CONTRACTOR shall be entitled to an extension of time and compensation in accordance with the provisions of the Contract Documents.

15.3 TERMINATION OF AGREEMENT BY OWNER FOR CAUSE

15.3.1 In the event of default by CONTRACTOR, OWNER shall give fourteen (14) Days written notice to CONTRACTOR of OWNER’s intent to terminate the Agreement and provide CONTRACTOR opportunity to remedy the conditions constituting the default.

15.3.2 CONTRACTOR Default - It shall be considered a default by CONTRACTOR when CONTRACTOR:

4.a
Packet Pg. 123 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 56

15.3.2.1 Declares bankruptcy, becomes insolvent, assigns its assets for the benefit of its creditors, or is unable to pay debts as they become due;

15.3.2.2 Fails to provide materials or workmanship meeting the requirements of the Contract Documents, and fails to correct the Defective Work as required by Article 13;

15.3.2.3 Disregards or violates provisions of the Contract Documents or OWNER’s instructions;

15.3.2.4 Fails to prosecute the WORK according to the approved progress schedule;

15.3.2.5 Fails to provide a qualified superintendent, competent workers or materials or equipment meeting the requirements of the Contract Documents;

15.3.2.6 Fails to maintain license or insurance.

15.3.3 If CONTRACTOR fails to remedy the conditions constituting default within the time allowed, OWNER may then issue the notice of termination.

15.3.4 In the event the Agreement is terminated in accordance with Article 15, OWNER may take possession of the WORK and may complete the WORK by whatever method or means OWNER may select. The cost of completing the WORK shall be deducted from the balance which would have been due CONTRACTOR had the Agreement not been terminated and the WORK completed in accordance with the Contract Documents. If such cost exceeds the balance which would have been due, CONTRACTOR shall pay the excess amount to OWNER. If such cost is less than the balance which would have been due, CONTRACTOR shall not have claim to the difference.

15.4 RIGHTS OF OWNER PRESERVED - Where CONTRACTOR’s services have been so terminated by OWNER, the termination will not affect any rights or remedies of OWNER against CONTRACTOR then existing or which may thereafter accrue. Any retention or payment of monies due CONTRACTOR by OWNER will not release CONTRACTOR from liability.

15.5 TERMINATION BY OWNER FOR JUST CAUSE - OWNER may terminate the Contract for just cause at its own discretion or when conditions encountered during the WORK make it impossible or impractical to proceed, or when OWNER is prevented from proceeding with the Agreement by act of God, by law or by official action of a public authority.

15.5.1 Termination for Convenience of OWNER

15.5.1.1 Termination of CONTRACTOR’s Performance of WORK - OWNER may terminate, subject to the express terms and conditions set forth below, CONTRACTOR’s performance of work under this Agreement, in whole or, from time to time, in part, if OWNER’s City Council does not appropriate sufficient monies to fund the Agreement. The City Manager shall terminate on behalf of OWNER by delivering to CONTRACTOR a notice of termination, in writing, specifying the extent of termination and the effective date

4.a
Packet Pg. 124 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 57

15.5.1.2 Notice of Termination - After receipt of the notice of termination, and except as otherwise directed by OWNER’s City Manager, CONTRACTOR shall immediately proceed as follows:

15.5.1.2.1 Stop WORK immediately or as specified in the notice;

15.5.1.2.2 Immediately place no further subcontracts for materials, services or facilities, except as necessary to complete any authorized, continued portion of the Agreement;

15.5.1.2.3 Immediately terminate all subcontracts to the extent they relate to the WORK terminated;

15.5.1.2.4 With approval by OWNER’s City Manager, settle all outstanding obligations arising from the termination of subcontracts, the approval of which will be final for purposes of this clause;

15.5.1.2.5 As directed by OWNER’s City Manager, transfer the title and deliver to OWNER, completed or partially completed drawings, plans, calculations, Specifications and any other documents and records that, if the Agreement has been completed, would be required to be furnished to OWNER;

15.5.1.2.6 Complete performance of the WORK not terminated;

15.5.1.2.7 Take any action that may be necessary, or that OWNER’s City Manager may direct, for the protection and preservation of the property related to the Contract Documents that is in the possession of CONTRACTOR and in which OWNER has or may acquire an interest.

15.5.1.3 Removal of CITY Property - CONTRACTOR may request OWNER to remove OWNER’s property or enter into an agreement for its storage. Within sixty (60) Days, OWNER will accept title of property and remove it or enter into a storage agreement.

15.5.1.4 Termination Settlement - After termination, CONTRACTOR shall submit a final termination settlement proposal to OWNER’s City Manager in the form and with the certification prescribed by OWNER’s City Manager. CONTRACTOR shall submit the proposal promptly, but not later than six (6) months from the effective date of termination, unless extended in writing, by OWNER’s City Manager upon written request of CONTRACTOR within this six (6) month period. However, if OWNER’s City Manager determines that the facts justify it, a termination settlement proposal may be received and acted on after six (6) months or any extension. If CONTRACTOR fails to submit the proposal within the time allowed, OWNER may, in good faith, determine, on the basis of information available, the fair and reasonable amount, if any, due CONTRACTOR as a result of the termination and pay the amount determined. If CONTRACTOR does not agree that the amount determined by OWNER’s City Manager is fair and reasonable, and if CONTRACTOR gives notice of such disagreement to OWNER in accordance with this paragraph of the Agreement within thirty (30) Days of receipt of payment, then the amount due shall be as fixed in a court of law.

4.a
Packet Pg. 125 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 58

15.5.1.5 Payment for CONTRACTOR Due to Termination - Subject to the above paragraph, CONTRACTOR and OWNER’s City Manager may agree upon the whole or any part of the amount to be paid because of the termination. The amount may include a reasonable allowance for profit on work done. However, the agreed amount, exclusive of costs shown in Paragraph

15.5.1.6.3 below, may not exceed the total dollar amount authorized by OWNER as reduced by (1) the amount of payments previously made; and (2) the Contract Price of work not terminated.

The Contract Documents shall be amended, and CONTRACTOR paid the agreed amount. The paragraph below shall not limit, restrict or affect the amount that may be agreed upon to be paid under this paragraph.

15.5.1.6 Failure to Agree on Payment - If CONTRACTOR and OWNER fail to agree on the whole amount to be paid because of the termination of WORK, OWNER shall pay CONTRACTOR the fair and reasonable amounts determined in good faith by OWNER as follows, but without duplication of any amounts agreed above:

15.5.1.6.1 The Contract Price for completed services accepted by OWNER not previously paid for, adjusted for any saving of freight and other charges.

15.5.1.6.2 The total of:

15.5.1.6.2.1 The costs incurred in the performance of the WORK terminated, including initial costs and preparatory expense allocable thereto, but excluding any costs’ attributable to services paid or to be paid under Paragraph 15.5.1.6;

15.5.1.6.2.2 The fair and reasonable cost of settling and paying termination settlement proposals under terminated subcontracts that are properly chargeable to the terminated portion of the Agreement if not included in paragraph above; and

15.5.1.6.2.3 A sum, as profit on the above paragraph determined by OWNER’s City Manager to be fair and reasonable under the circumstances; however, if it appears that CONTRACTOR would have sustained a loss on the entire Agreement had it been completed, OWNER shall allow no profit under this paragraph and shall reduce the settlement to reflect the indicated rate of loss.

15.5.1.6.3 The reasonable costs of settlement of the WORK terminated, including:

15.5.1.6.3.1 Accounting, legal, clerical and other expenses reasonably necessary for the preparation of termination of settlement proposals and supporting data;

15.5.1.6.3.2 The termination and settlement of subcontracts (excluding the amounts of such settlements); and

15.5.1.6.3.3 Storage, transportation and other costs incurred, reasonably necessary for the preservation, protection or disposition of property in which OWNER has or may acquire an interest.

4.a
Packet Pg. 126 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 59

15.5.1.7 Dispute of Payment - If CONTRACTOR does not agree that the amount determined by OWNER’s City Manager under the paragraph above is fair and reasonable and if CONTRACTOR gives notice of such disagreement to OWNER in accordance with Paragraph 15.5.1.4 of this Contract within thirty (30) Days of receipt of payment, then the amount due shall be as determined in a court of law.

15.5.1.8 Payment for Property Destroyed, Lost Stolen or Damaged - Except to the extent that OWNER expressly assumed the risk of loss, OWNER’s City Manager shall exclude from the amounts payable to CONTRACTOR under Paragraph 15.5.1.6 above, the fair value, as determined by OWNER’s City Manager, of property that is destroyed, lost, stolen or damaged so as to become undeliverable to OWNER.

15.5.1.9 Determination of Amount Due CONTRACTOR - In arriving at the amount due CONTRACTOR under this clause, there shall be deducted:

15.5.1.9.1 All unliquidated advance or other payments to CONTRACTOR under the terminated portion of this Agreement;

15.5.1.9.2 Any claim which OWNER has against CONTRACTOR under this Agreement; and

15.5.1.9.3 The agreed price for, or the proceeds of sale of, materials, supplies or other things acquired by CONTRACTOR or sold under the provisions of this clause and not recovered by or credited to OWNER.

15.5.2 Partial Termination - If the termination is partial, CONTRACTOR may file a proposal with OWNER’s City Manager for an equitable adjustment of the price(s) of the continued portion of the Agreement. OWNER shall make any equitable adjustment agreed upon. Any proposal by CONTRACTOR for an equitable adjustment under this clause shall be requested within ninety (90) Days from the effective date of termination unless extended, in writing, by OWNER’s City Manager.

15.5.2.1 Partial Termination Payment - OWNER may, under the terms and conditions it prescribes, make partial payment and payments against costs incurred by CONTRACTOR for the terminated portion of the Agreement if OWNER’s City Manager believes the total of these payments will not exceed the amount to which CONTRACTOR will be entitled. If the total payments exceed amount finally determined to be due, CONTRACTOR shall repay the excess to OWNER upon demand, together with interest. Interest shall be at a rate of six (6) percent per annum compounded daily and shall be computed for the period from the date the excess payment is received by CONTRACTOR to the date the excess is repaid. Interest shall not be charged on any excess payment due to a reduction in CONTRACTOR’s termination settlement proposal because of retention or disposition, or a later date determined by OWNER’s City Manager because of the circumstances.

15.5.5.3 Records and Documents Relating to Termination - Unless otherwise provided in the Agreement or by statute, CONTRACTOR shall maintain all records and documents relating to the terminated portion of this Agreement for three (3) years after final settlement. This includes all

4.a
Packet Pg. 127 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 60 books and other evidence bearing on CONTRACTOR’s costs and expenses under this Agreement.

CONTRACTOR shall make these records and documents available to OWNER, at CONTRACTOR’s office, at all reasonable times, without any direct charge. If approved by OWNER’s City Manager, photographs, microphotographs or other authentic reproductions may be maintained instead of original records and documents.

15.6 TERMINATION OF AGREEMENT BY CONTRACTOR - CONTRACTOR may terminate the Agreement upon ten (10) Days written notice to OWNER, whenever:

15.6.1 the WORK has been suspended under the provisions of Article 15, for more than ninety (90) consecutive Days through no fault or negligence of CONTRACTOR, and notice to resume work or to terminate the Agreement has not been received from OWNER within this time period; or,

15.6.2 OWNER should fail to pay CONTRACTOR any monies due him in accordance with the terms of the Contract Documents and within ninety (90) Days after presentation to OWNER by CONTRACTOR of a request therefor, unless within said ten (10) Day period OWNER shall have remedied the condition upon which the payment delay was based.

15.6.3 In the event of such termination, CONTRACTOR shall have no claims against OWNER except for those claims specifically enumerated in Article 15, herein, and as determined in accordance with the requirements of said paragraph.

ARTICLE 16 - DISPUTES

16.1 GENERAL - All claims, counterclaims, disputes and other matters in question arising under, or relating to, the Contract Documents and/or the breach thereof shall be processed in accordance with the provisions of this Article and are subject to audit by OWNER’s internal audit staff in accordance with Article 17.

16.2 REQUESTS FOR CHANGE

16.2.1 CONTRACTOR’s Right To Request a Change - In accordance with Articles 11 and 12, CONTRACTOR may request a change in the Contract Price or an extension of the Contract Time.

Such a request shall be in writing, and shall be delivered to OWNER within the time periods outlined in Articles 11 and 12.

16.2.2 Initial Determination - OWNER shall make an initial determination on CONTRACTOR’s request in writing, within twenty (20) working Days of receipt of the requested supporting data.

16.2.3 CONTRACTOR Appeal and Claim - Should CONTRACTOR disagree with OWNER’s initial determination, CONTRACTOR may file a Claim requesting a final determination from OWNER. Such a request shall be in writing, and shall be delivered within twenty (20) working Days after receipt of OWNER’s initial determination, and after certifying his Claim in accordance with Paragraph 16.3.

4.a
Packet Pg. 128 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 61

16.2.4 Waiver Of Rights - Failure of CONTRACTOR to notify OWNER and deliver supporting data in accordance with the time periods outlined above or failure to respond to OWNER’s initial determination within the time period outlined in this paragraph, shall be deemed to be a waiver of objection or right to further Claim of this matter.

16.3 CLAIMS

16.3.1 16.3.5 Progress Schedule Analysis - All Claims for time shall be supported by an analysis of the CPM Progress Schedule detailing the impact of the claimed work on specific impacted schedule activities.

16.4 CLAIM RESOLUTION PROCESS
The following provisions shall apply regarding claims:

As set out in Public Contract Code Section 9204 this provision shall apply to any claim by a contractor in connection with a public works project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) “Public entity” means the City of El Centro.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the

4.a
Packet Pg. 129 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 62 governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation.

Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.

4.a
Packet Pg. 130 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 63 (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.
(h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.

16.5 VENUE

16.5.1 State of California - CONTRACTOR, and any Subcontractor, Supplier and any other person or organization performing any part of WORK, agree that each of them will waive jurisdiction and venue and shall submit to the jurisdiction of the courts of the State of California, regardless of residence or domicile, with respect to any actions or suits at law or in equity arising under or related to the bidding, award or performance of the WORK.

16.5.2 County Where OWNER’s Headquarters Located - CONTRACTOR, Subcontractor, Supplier or any other person or organization shall not commence any action, other than those in the State of California in the county where OWNER’s Headquarters are located, against OWNER and OWNER or any of their consultants, and/or any of their respective directors, officers, employees, representatives or agents, with regard to any matter whatsoever arising out of or relating to the validity, construction, interpretation or reinforcement of the Agreement.

ARTICLE 17 -- MISCELLANEOUS

17.1 GIVING NOTICE - Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended,

4.a
Packet Pg. 131 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 64 or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice.

17.2 CUMULATIVE REMEDIES - The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto, and, in particular but without limitation, the warranties, guarantees and obligations imposed upon CONTRACTOR by the General Conditions and all of the rights and remedies available to OWNER and OWNER thereunder are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by laws or regulations, by special warranty or guarantee or by other provisions of the Contract Documents, and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply.

17.3 PROFESSIONAL FEES AND COURT COSTS INCLUDED - Whenever reference is made to claims, costs, losses and damages, it shall include in each case, but not be limited to, all fees and charges of engineers, architects and other professionals and all court or arbitration or other dispute resolution costs. Attorneys’ fees are specifically excluded and shall be the responsibility of each party.

17.4 RIGHT TO AUDIT

17.4.1 Owner’s Right - If CONTRACTOR submits a Claim or a time and material Change Order to OWNER for additional compensation, OWNER shall have the right, as a condition to considering the Claim, and as a basis for evaluation of the Claim, and until the Claim has been settled, to audit CONTRACTOR’s books to the extent they are relevant.

17.4.2 Right Includes - This right shall include the right to examine books, records, documents and other evidence and accounting procedures and practices, sufficient to discover and verify all direct and indirect costs of whatever nature claimed to have been incurred or anticipated to be incurred and for which the claim has been submitted.

17.4.3 Right To Inspect Plans - The right to audit shall include the right to inspect CONTRACTOR’s plans, or such parts thereof, as may be or have been engaged in the performance of the WORK.

17.4.4 CONTRACTOR further agrees that the right to audit encompasses all subcontracts and is binding upon Subcontractors. The rights to examine and inspect herein provided for shall be exercisable through such representatives as OWNER deems desirable during CONTRACTOR’s normal business hours at the office of CONTRACTOR.

17.4.5 Accounting Records - CONTRACTOR shall make available to OWNER for auditing, all relevant accounting records and documents, and other financial data, and upon request, shall submit true copies of requested records to OWNER.

4.a
Packet Pg. 132 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro
EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT GC 65

17.5 ALL LEGAL PROVISIONS INCLUDED - All provisions of law required to be inserted in the Agreement or Contract Documents shall be and are inserted herein. If through mistake, neglect, oversight or otherwise, any such provision is not herein inserted or inserted in improper form, upon the application of either party, the Agreement or Contract Documents shall be changed by OWNER, at no increase in Contract Price or extension in Contract Time, so as to strictly comply with the law and without prejudice to the rights of either party hereunder.

17.6 NO CONFLICT WITH LAWS OR REGULATIONS

17.6.1 The duties, obligations, criteria or procedure imposed by these General Conditions and the rights and remedies made available are in addition to, and are not to be construed in any way as a limitation of any rights and remedies available to any or all of them which are otherwise imposed or available by laws or regulations, except that in the event that a specific part or detailed requirement of a provision, criterion or procedure in these General Conditions and a specific part or detailed requirement of a provision, criterion or procedure imposed or available by laws or regulations are in conflict, the specific part or detailed requirement of such provision, criterion or procedure imposed or available by laws or regulations in conflict shall govern. All other specific parts or detailed requirements in the provisions, criteria or procedures of the applicable laws or regulations and these General Conditions not in conflict shall remain in full force and effect and be read with the controlling specific part or detailed requirement.

17.6.2 The provisions of paragraph 17.6 will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply.
- END OF GENERAL CONDITIONS –

4.a
Packet Pg. 133 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro

EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT
SGC1

SUPPLEMENTARY GENERAL CONDITIONS

4.a
Packet Pg. 134 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro

EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT
SGC2

SUPPLEMENTARY GENERAL CONDITIONS

GENERAL
These Supplementary General Conditions make additions, deletions or revisions to the General Conditions as indicated herein. All provisions which are not so added, deleted or revised remain in full force and effect. Terms used in these Supplementary General Conditions which are defined in the General Conditions have the meanings assigned to them in the General Conditions.

SGC-1 DEFINITIONS
Apparent Low Bidder - The Bidder whose Bid, having been publicly opened and read aloud, meets all the material requirements of the Bidding Documents, OWNER deems responsible in accordance with the OWNER’s municipal code, and whose Bid price is the lowest received.

Days shall mean calendar days unless otherwise provided.

SGC-5.1 PERFORMANCE AND OTHER BOND AMOUNTS
CONTRACTOR shall furnish a satisfactory Performance Bond in the amount of one hundred (100) percent of the Contract Price and a satisfactory Payment Bond in the amount of one hundred (100) percent of the Contract Price.

SGC-5.2.2 CONTRACTOR shall provide the types and amounts of insurance as set out in the Agreement:

SGC-5.2.3 CONTRACTOR shall provide the indemnification set out in the Agreement.

SGC-6.18 SAFETY
SGC-6.18.3 CONTRACTOR shall provide a qualified on-site health and Safety representative, accepted by OWNER, with the authority to enforce all of the Safety requirements of CONTRACTOR’s health and Safety program, including implementation of CONTRACTOR’s injury and illness prevention program. OWNER will make a risk-based decision as to the qualification level of CONTRACTOR’s Safety representative. During periods of active construction (i.e., excluding weekends, weather delays or other periods of work inactivity), CONTRACTOR must have a designated representative on the construction worksite who is knowledgeable of the Project’s hazards and has full authority to act on behalf of CONTRACTOR. CONTRACTOR’s designated representative must make frequent and regular inspections of the construction worksite to identify and correct any instances of noncompliance with the Project health and Safety requirements.

4.a
Packet Pg. 135 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro

EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT
SGC3
SGC-6.5 SUBCONTRACT LIMITATIONS
In addition to the provisions of Paragraph 6.5 of the General Conditions, CONTRACTOR shall perform not less than twenty (20) percent of the WORK with its own forces (i.e., without subcontracting). The twenty (20) percent requirement shall be understood to refer to the WORK, the value of which totals not less than twenty (20) percent of the Contract Price.

SGC-11.3.4 EQUIPMENT RENTAL RATES
CONTRACTOR will be paid for the use of equipment at the rental rate listed for such equipment specified in the current edition of the following reference publication:

A. “Rental Rate Blue Book” as published by Dataquest (a company of the Dunn and Bradstreet Corporation), 1290 Ridder Park Drive, San Jose, CA 95131, telephone number (408) 437-8000 or outside of California (800) 669-3282
SGC-12.5 INCLEMENT WEATHER DELAYS
CONTRACTOR’s construction schedule shall be based upon the inclusion of five (5) Days of inclement weather delays.

An inclement weather delay is defined as a delay caused by inclement weather which prevents CONTRACTOR from working on the controlling item in CONTRACTOR’s construction schedule. Should CONTRACTOR experience inclement weather delays over the course of contract duration in excess of the number of Days outlined above, CONTRACTOR shall be granted a time extension in accordance with the provisions outlined in Article 12 of the General Conditions. The time extension shall be based on the number of inclement weather Days in excess of the number of Days outlined above.

SGC-14.13 LIQUIDATED DAMAGES
SGC-14.13.3 OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the WORK is not completed within the time specified in Article 2 herein, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the WORK is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay two thousand dollars ($2,000) for every working Day that expires in excess of the time specified for final completion of the WORK.

END OF SUPPLEMENTARY GENERAL CONDITIONS

4.a
Packet Pg. 136 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City of El Centro

EAST MAIN STREET EVAN HEWES HWY REHABILITATION PROJECT
S1

SPECIFICATIONS

1.01 STANDARD SPECIFICATIONS
Unless indicated otherwise, the work embraced herein shall be done in accordance with the appropriate provisions of construction details as shown in the specifications entitled “GREEN BOOK Standard Specifications for Public Works Construction,” the 2021 edition, insofar as the same may apply, which specifications are hereinafter referred to as the Standard Specifications and in accordance with the following provisions:

Class II base and Conventional Asphalt shall comply with Caltrans Standard Specifications, latest edition.

In case of conflict between the Standard Specifications and these General Conditions and Specifications, the General Conditions and Specifications shall take precedence over and be used in lieu of such conflicting portions.

1.02 SCOPE OF WORK
The work shall include grinding of existing asphalt concrete pavement, installation of asphalt-rubber and aggregate membrane, gap graded asphalt-rubber hot mix, conventional-asphalt concrete, minor aggregate base, monument preservation, utility cover adjustments and traffic control as described in Chapter 5 of the Caltrans Traffic Manual and the latest edition of Manual of Uniform Traffic Control Devices (“California MUTCD”).

END OF SPECIFICATIONS

4.a
Packet Pg. 137 Attachment: Evan Hewes Specifications (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057))

4.b
Packet Pg. 138 Attachment: EVAN HEWES signed PLANS APPROVED (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057))

4.b
Packet Pg. 139 Attachment: EVAN HEWES signed PLANS APPROVED (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057))

4.b
Packet Pg. 140 Attachment: EVAN HEWES signed PLANS APPROVED (6178 : Approve Plans and Specs Evan Hewes Highway Rehab CRASL 5169 (057)) City Council of the City of El Centro Meeting: 11/07/23 11:30 AM 1275 Main Street Department: Community Services
El Centro, CA 92243 Category: Authorization
Prepared By: Stacy Mendoza
SCHEDULED Department Head: Adriana Nava
ACTION ITEM (ID # 6186) DOC ID: 6186
Approval of Bid Documents for CDBG Commercial Facade
Improvement Program Authorize the Community Services
Department to Send Out to Bid
CITY MANAGER’S RECOMMENDATION:

Approval of Bid Documents for the CDBG Commercial Facade Improvement Program and Authorize the Community Services Department to Send out to Bid FISCAL IMPACT:

The fiscal impact is $135,147 in Community Development Block Grant Program funds for the CDBG Commercial Façade Improvement Program.

STRATEGIC PLANNING PROGRAM 2013-2018 RELATION:

Goal #4 Business Development & City Beautification
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE

DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTORS LICENSE, REFERENCE CHECKS, INSURANCE, ETC:

City Staff will reference check local contractors as needed following the bidding process.

BACKGROUND:

The City of El Centro recognizes the importance of Downtown El Centro. A Downtown Task Force to improve the conditions of El Centro's downtown area was formed in 2021.

Mayor Martha Cardenas-Singh and Mayor Pro Team Sylvia Marroquin, as well as various City Staff, work together to bring about creative solutions for the downtown area, which generally encompasses the area from 4th Street to 8th Street, and from Broadway to State Streets. One of the objectives is to beautify the downtown area and a recommendation was made by the Task Force for the establishment of a Downtown Façade Improvement Program.

On May 4, 2021, City Council approved the Downtown Façade Improvement Program and corresponding guidelines as well as the allocation of $125,000 of Measure P funds for the program. Following Council’s approval, Staff worked with the business and property owners in the downtown area to complete nine projects, fully expending the allocated Measure P funding.

To continue with the Façade Improvements in the downtown area, on January 18, 2022, Council approved a Substantial Amendment to the 2021-22 CDBG Annual Action Plan to allocate $134,147 in CDBG funding toward the City's Facade Improvement efforts in the downtown area.

Due to CDBG regulations, it was determined that this next phase of Façade Improvements would need to be under a completely separate set of guidelines than the 5 Packet Pg. 141
Action Item (ID # 6186) Meeting of November 7, 2023
first phase. Because of the differing rules, each potential business/property would need to be re-qualified under the new guidelines. To that end, the “Downtown Façade Improvement Program” was closed out and all pending clients were notified.

On December 20, 2022, Council approve the guidelines for the CDBG Façade Improvement Program Guidelines and application. Significant changes included:
• Eligible improvements are limited to painting of the façade and minor stucco repairs deemed necessary by the City to allow for a more aesthetically pleasing paint job.
• Business owners are not eligible to apply; the property owner must be the applicant.
• Per property assistance increased to $20,000.
• Program boundaries reduced to Main Street facing businesses between 4th Street and 8th Street.
• Program limited to properties with at least one façade facing business that is currently in operation.
• Vacant buildings are not eligible.
• Property owner must demonstrate and certify that a tenant business meets the National Objective as described above.

The submittal requirements include a completed and signed application from the property owner, signed liability waiver, proof of property insurance, proof of business license of a qualifying business located within the façade of the property. Applications were processed on a first-come, first served basis and applications from the Downtown Façade Improvements Program were not rolled over to this new program; property owners were notified that they would need to re-apply.

The Community Services Department - Economic Development Division administers the program and will work with a contractor to ensure the improvements made to the properties are consistent with the City’s desired aesthetic.

DISCUSSION:

Since the approval of the CDBG Facade Improvement Program guidelines, Staff has marketed the program to the downtown merchants. The City received nine applications; however, one was not processed due to the improvements being completed by the property/business owner. All other applications were deemed eligible and included on the bid form.

Due to the number of applications and the limited available funding, there is a potential not all businesses will be improved. Staff did receive an application from the WomanHaven Thrift store. Due to the size of the building, it is likely there will be insufficient funding to complete this building. It was added to the bid documents as an "Additive" item.

The provided bid documents were prepared and approved by the City's legal department for public bidding. One contractor will be hired to complete the entire scope 5 Packet Pg. 142
Action Item (ID # 6186) Meeting of November 7, 2023
of work.

CONCLUSION:

It is Staff’s recommendation that City Council approve the Bid Documents and Authorize staff to send the project out to bid.

ATTACHMENTS:
• Facade Bidding docments to Council (PDF)
5 Packet Pg. 143
City of El Centro
Community Development Block Grant
Façade Improvement Program

PROJECT MANUAL

PROJECT CODE
September 2023

5.a
Packet Pg. 144 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program)

CITY OF EL CENTRO

STATE OF CALIFORNIA
FAÇADE IMPROVEMENT PROGRAM

TABLE OF CONTENTS
Title Section Page Number
Invitation for Bids 3-6
Required Documents 7
Proposal Requirements 8-13
City of El Centro Equal Opportunity 14-15
Proposal Bid Form 16-17
Bid Bond 18
Proposal Agreement 19
Agreement 20-33
Exhibit A 34-37
Faithful Performance Bond 38
Labor and Materials Bond 39
Workers’ Compensation Insurance Certification 40
Drug and Alcohol Testing Requirements 41
Subcontractor’s Listing 42-43
Noncollusion Affidavit 44
Corporate Certification or Partnership Information 45
Contractor’s Certification of Qualification for License Classification 46 Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion
47-48
Section 3 of the Housing & Urban Development Act of 1968 49-53 State Income Limits for 2013 54
Section 3 Affirmative Action Plan 55-56
Section 3 Assurance 57
Section 3 Workforce Breakdown 58
Section 3 Proposed Contract / Subcontracts Breakdown 59 Section 3 Commitment for Construction Contracts 60
Female and Minority Goals and Timetables 61
Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity
62 Minority / Women’s Business Enterprise Construction Projects 63 Contractor’s / Subcontractor’s Certification Concerning State Labor Standards and Prevailing Wages
64 5.a
Packet Pg. 145 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program)

CITY OF EL CENTRO

STATE OF CALIFORNIA
FAÇADE IMPROVEMENT PROGRAM

TABLE OF CONTENTS
Title Section Page Number
General Conditions 64-89
Supplemental General Conditions (State) 90-94
Special Provisions 95
Procurement 96
Equal Opportunity Standard Contract Language (Attachment A) 97-98 Equal Opportunity Clause and Federal Equal Employment Opportunity Construction Contract Specifications
99-105
CDBG Standard Contract Language (Attachment B) 106-108
Additional CDBG Compliance Requirements (Attachment C) 109-110 Drug Free Workplace Certification (Attachment D) 111
Section 3 Clause (Attachment E) 112
The Immigration Reform and Control Act (Attachment F) 113 Federal Labor Standards Provisions 114-117
State Labor Standards Provisions 118
Certification of Understanding and Authorization 119
U.S. Department of Labor Payroll Forms ------
State Prevailing Wages ------
Specifications Appendix A
Plans Appendix B

5.a
Packet Pg. 146 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 3 INVITATION FOR BIDS

1. GENERAL INFORMATION
The City of El Centro (“the City”) is inviting bids for the Community Development Block Grant Façade Improvement Program located in the 400-700 blocks of Main Street, El Centro, California.

2. SCOPE OF WORK
The work involves painting the façades of various businesses located in downtown El Centro on Main Street between 4th Street and 8th Street. Some of the sites will also require minor patch and stucco work prior to painting. The specific locations and detailed work description have been provided on the Bid Proposal Form.

3. PROJECT SCHEDULE
To be completed within forty five (45) calendar days after the issuance of a Notice to Proceed.

All days set out in this Bid Packet are calendar days unless otherwise specified.

4. PROPOSAL REQUIREMENTS
SEALED PROPOSALS will be accepted at the Office of the City Clerk, City Hall, 1275 Main Street, El Centro, California until 2:00 PM local time on , , 2023, at which time all proposals will be publicly opened and read aloud.

Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, his/her address, and the name of the project for which the bid is submitted. If forwarded by mail, the sealed envelope containing the bid must be enclosed in another envelope addressed as specified in the bid form. No emailed bids will be accepted.

Questions may be submitted until 10 calendar days before bid opening via email to [email protected] or via the City’s Planetbids.com platform. Any responses will be posted as an addenda to the bid documents. No oral responses will be given.

PLANS & SPECIFICATIONS:

Copies of plans and specifications (bid book) may be obtained at Planetbids.com via the City of El Centro website www.cityofelcentro.org.

Bidders are also responsible for checking the City’s website at www.cityofelcentro.org for any addenda that may be posted.

MANDATORY PRE-BID MEETING: Bidders are required to attend a pre-bid meeting which will be conducted by the City’s Construction Manager at 10 a.m. on , 2023. The meeting will be held at the City’s Economic Development Division Conference Room located at 1249 Main Street in El Centro. The object of the meeting is to acquaint bidders with the site conditions and mandatory bidding requirements. At that meeting the City’s Equal Opportunity Program goals and reporting procedures will be discussed.

No bid will be received unless it is made on the prescribed bid form furnished by the City. Each bid must be accompanied by a guaranty of cash, certified check, cashier’s check or bid bond

5.a
Packet Pg. 147 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 4 made payable to the City of El Centro for an amount equal to at least ten percent (10%) of the bid. Such guaranty will be forfeited should the bidder to whom the contract is awarded fail to enter the contract. All guaranties are to be returned after the contract is awarded.

In addition to the required documents listed on page 4, the bid may be considered incomplete and be disqualified if any of the following information is not provided.

1. On the bid form(s), the unit price items must be written in figures and total contract price must be written in words and figures. The words and figures shall appear on the blank spaces provided.

2. On pages 23-24 the Subcontractor’s Listing shall be completed. If no subcontractor will be used, indicate an “X” mark on the space provided for “No subcontractor.” The contractor shall possess a Class C-33 license at the time this contract is awarded.

Prevailing Wage Rates:

Payment of not less than minimum salaries and wages as set forth in the specifications is required. The salary and wage for any classification shall be the current applicable Federal wage rates or the state wage rates, whichever is higher.

The Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are set forth in the books issued for bidding purposes entitled “Proposal and Contract,” and in copies of this book that may be examined at the offices described above where project plans, special provisions and proposal forms may be seen. Addenda to modify the Federal minimum wage rates, if necessary, will be issued to holders of “Proposal and Contract” books.

In addition, Federal classifications and wage scales can be obtained at www.sam.gov.

State wage rates are set out at ____________.

Liquidated damages:

As set out in Section XVI of the Construction Services Agreement, CONTRACTOR shall pay to the CITY the sum of Five Hundred ($500.00) for each and every calendar day of delay beyond the Contract Time, or beyond any completion schedule, construction schedule or Project milestones established in or pursuant to the Project Schedule, or beyond the time indicated in the Project Schedule for any individual Contract activity.

Contractor and Subcontractor Registration with Department of Industrial Relations.

A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Public Contract Code §4104, or engage in the performance of any contract for public work, as that term is defined in Division 2, Part 7, Chapter 1 of the Labor Code, unless currently registered and qualified to perform public work pursuant to Labor Code §1725.5. It is not a violation of Labor Code §1771.1 for an unregistered contractor to submit a bid that is authorized by Business and Professions Code §7029.1 or by Public Contract Code §§ 10164 or 20103.5, provided the contractor is registered to perform public work pursuant to Labor Code §1725.5 at

5.a
Packet Pg. 148 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 5 the time the contract is awarded. A bid shall not be accepted nor any contract or subcontract entered into without proof of the contractor’s and all subcontractor's current registration to perform public work pursuant to Labor Code §1725.5.

CDBG requirements for this project are set out as attachments to the sample contract.

AWARD BASIS: The contract will be awarded based on the lowest responsive and responsible base bid as shown in the bid proposal form. See bid proposal form for further clarification.

Special attention of all prospective bidders is called to “Proposal Requirements and General Conditions” annexed to the blank form of the proposal for full directions as to bidding, etc.

If bidder is a corporate entity and is awarded the contract, prior to execution of the contract, the contractor shall submit satisfactory, documentary proof that the person(s) executing said contract on the behalf of said corporation has authority to do so.

Pursuant to California Public Contract Code §22300, the Contractor has the option of substituting securities for any money that is withheld by the City. Refer to section 1-23 of the General Conditions for further information.

THIS PROJECT IS FUNDED WITH Community Development Block Grant (CDBG) FUNDS AND

THUS IS SUBJECT TO ADDITIONAL STATE AND FEDERAL REQUIREMENTS CITY’S RIGHTS RESERVED: The City reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the City.

DATE: _____________________ CITY OF EL CENTRO, CALIFORNIA _____________________________
Norma Wyles, City Clerk

END OF INVITATIONS FOR BIDS

5.a
Packet Pg. 149 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 6 REQUIRED DOCUMENTS
The following is a list of documents to be submitted as part of the bid packet. Proposals not containing the following documents could be considered incomplete and are subject to rejection.
• Proposal/Bid Form
• Bid Bond
• Proposal Agreement
• Workers’ Compensation Certificate
• Drug/Alcohol Testing Requirements
• Noncollusion Affidavit
• Subcontractor’s Listing
• Corporate Certification Partnership Information
• Certification Regarding Debarment, Suspension, Ineligibility And Voluntary Exclusion • Section 3 – Affirmative Action Plan
• Section 3 – Assurance
• Section 3 – Estimated Project Workforce Breakdown
• Section 3 – Proposed Contracts/Subcontracts Breakdown • Notice of Requirement for Affirmative Action to Ensure Equal Opportunity • Minority/Women’s Business Enterprises Construction Projects • Contract/Subcontract Certification Concerning State Labor Standards and Prevailing Wages
If the bidder is unable to achieve attainment of Section 3, Minority Business Enterprise or Women’s Business Enterprise firms, then documentation of good faith effort will be required to be submitted upon request of the City.

5.a
Packet Pg. 150 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 7 PROPOSAL REQUIREMENTS

1. Examination of Plans, Specifications, Special Provisions and Site of Work: The bidder is required to examine carefully the site of work contemplated and it will be assumed that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality and quantities of work to be performed and materials to be furnished and as to the requirements of the specifications, special provisions and the contract. It is mutually agreed that submission of a proposal shall be considered prima facie evidence that the bidder has made such examination.

2. Bid Form: All proposals must be made on the bid forms to be obtained from the Community Services Department, Economic Development Division, at 1249 West Main Street, El Centro, CA or via the City’s online bidding portal at PlanetBids.com. All bids must give the prices proposed both in writing and figures and must be signed by the bidder with bidders’ business address.

If the bid is made by an individual, the individual's name and post office address must be shown. If made by a firm or partnership, then the name and post office address of each member of the firm or partnership must be shown. If made by a corporation, then the bid must show the name of the State under the laws of which the corporation is chartered and the name, titles and business addresses of the President, Secretary and Treasurer. A certification by the legal representative of the firm must be included in the bid.

3. Rejection of Bid Containing Alterations, Erasures or Irregularities: Proposals may be rejected if they show any alterations of form, additions not called for, conditional or alternative bids, incomplete bids, erasures or irregularities of any kind.

4. The Bid may be withdrawn upon request by the bidder without prejudice prior to, but not after the time fixed for opening of bids provided that the request is in writing, has been executed by the bidder or the bidders duly authorized representative and is filed with the City Clerk.

4.1 Omissions and Discrepancies: If the bidder finds discrepancies in or omissions on the drawings, or other contract documents or if bidder is in doubt as to their meaning, the bidder must at once notify the Director of Community Services who may send a written instruction to all bidders. Discrepancies or omissions raised after the award of bid are not a basis for relief of the bidder.

4.2 Interpretations and Addenda: No oral interpretations shall be made to any bidder as to the meaning of any of the contract documents, or be effective to modify any of the provisions of the contract documents. Every request for an interpretation shall be made in writing and addressed and forwarded to the Community Services Director (“Community Services Director”).

4.3 The City reserves the right to reject any or all bids.

5. Bidder’s Guaranty: All bids shall be presented under sealed cover and shall be accompanied by cash, cashier's check, certified check, or bid bond made payable to the City of El Centro for an amount equal to at least ten percent (10%) of the amount of said bid, and no bid shall be considered unless such cash, cashier's check, certified check or bid bond is enclosed therewith.

5.a
Packet Pg. 151 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 8 5.1 Return of Bid Guaranty: Within ten (10) days after the award of the contract, the City Council will return the bid guaranties accompanying the bids, which are not to be considered in making the award. All other bid guaranties will be held until the contract has been finally executed, after which they will be returned to the respective bidders whose bids they accompany.

5.2 Execution of Contract: The contract and contract documents shall be signed by the successful bidder and returned together with the contract bonds, within ten (10) days, not including Sundays, after the bidder has received notice the contract has been awarded. No bid shall be considered binding upon the City until the execution of the contract. Failure to execute the contract and file acceptable bonds as provided herein within ten (10) days, not including Sundays, after the bidder has received notice that the contract has been awarded, shall be just cause for the annulment of the award and the forfeiture of the proposal guaranty.

5.3 Sureties: The successful bidder shall also promptly secure with a responsible corporate surety or corporate sureties satisfactory bonds conditioned upon faithful performance by the said bidder of all the requirements under the contract and upon the payment of claims of any material men and laborers thereunder.

6. Award of Contract: The award of the contract, if it is awarded, will be to the lowest responsive and responsible bidder whose bid complies with all the requirements prescribed. The lowest bid shall be the lowest base bid price on the base contract and those additive or deductive items that are specifically identified in the bid solicitation as being used for the purpose of determining the lowest bid price. The award, if made, will be made within sixty (60) calendar days after the opening of the proposals. All bids will be compared on the basis of the Engineer estimate of quantities of work to be done.

7. Projects financed in whole or in part with State or Federal funds shall be subject to inspection at all times by the Director of Public Works or his agents.

8. Removal of Defective and Unauthorized Work: All work which is defective in its construction or deficient in any of the requirements of these specifications, special provisions or plans shall be remedied or removed and replaced by the Contractor in an acceptable manner and no compensation will be allowed for such correction. Any work done beyond the lines and grades shown on the plans or established by the Community Services Director, or any extra work done without written authority will be considered as unauthorized and will not be paid for.

9. Upon failure on the part of the Contractor to comply with any order of the Community Services Director made under these provisions, the Community Services Director shall be the authority to cause defective work to be removed and to deduct the costs thereof from any monies due or to become due to the Contractor.

10. Final Inspection: Whenever the work provided and contemplated by the contract shall have been satisfactorily completed and the final clean up performed, the Community Services Director will make the final inspection at the site.

11. Amount of Bonds: The faithful performance bond shall be in the sum of not less than one hundred percent (100%) of the contract price.

5.a
Packet Pg. 152 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 9 The bond for materials and laborers shall be in an amount equal to not less than one hundred percent (100%) of the contract price. The form of bond required is attached to the form of contract below.

Payment and performance bonds shall be executed by a California-admitted surety insurer with a minimum A. M. Best Company rating of A+, Class VII.

Whenever any surety or sureties on any such bond, or on any bonds required by law for the protection of the claims of laborers and material men, become insufficient or the City Council has cause to believe such surety or sureties have become insufficient, a demand in writing may be made of the Contractor for such further bond or bonds or additional surety, not exceeding that originally required, as is considered necessary, considering the extent of the work remaining to be done. Thereafter, no payment shall be made upon such contract to the contractor or any assignee of the contractor until such further bond or bonds or additional surety has been furnished.

12. Compliance with Laws and Regulations: No proposal for work will be accepted from a contractor who is not licensed in accordance with the law under the provisions of Chapter 9 of Division III, of the Business and Professions Code of the State of California, as amended. The contractor awarded the contract shall also submit the Contractor’s Certification of Qualifications for License Classification contained in these contract documents along with the submission of the executed contract and acceptable sureties.

All bids submitted and all contracts awarded hereunder must be submitted, filed, made and executed in accordance with all applicable laws of the State of California and of the United States of America which relate to bids and contracts of the nature referred to herein, whether such laws are expressly referred to herein or not.

13. PREVAILING WAGES: In accordance with the provisions of Labor Code §§1770 to 1781, the City Council of the City of El Centro has adopted the latest publication of the General Prevailing Wage Rates entitled, “State of California, Department of Transportation, Equipment Rental Rates and General Prevailing Wage Rates.” Please note that federal prevailing wage requirements also apply.

14. Filing of Bid Protests: By submitting a Bid, each Bidder hereby agrees and understands that the Bidder must comply with these protest procedures and exhaust all administrative remedies set forth herein prior to the initiation of any type of related legal action. With the express written consent of the City and Bidder, and subject to the requirements of applicable law, this protest procedure can also be used to resolve issues surrounding the City's determination of a Bidder as not responsible. The following terms as used in this Section shall have the following meanings:
“Protest” shall mean a written objection by an interested party or affected party to (i) the requirements or specifications contained in the Notice to Bidders or any portion of the documents accompanying that notice; or (ii) a proposed award recommendation protest.

A. Solicitation Phase Protest. The purpose of the solicitation is to obtain competitive Bids from Bidders. Any Bidder who has submitted a bid and who believes that a free and open competition has not taken place or that a particular specification or requirement is impractical, unduly restrictive, or ambiguous may advise the City of its concerns by submitting a detailed Solicitation Protest Statement in accordance with the requirements set forth below in this Section

5.a
Packet Pg. 153 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 10 A. The Protest does not replace the requirement to report irregularities in the bid documents. (1) Contents and Requirements
A solicitation protest must be submitted to the contact named in the bid documents by personal delivery or email by close of business at least fifteen (15) calendar days prior to the Bid due date, and must contain all of the following to be considered:
a) The name, address, and telephone number of the protestor; and b) The Project Name and Project Number; and
c) A detailed statement setting forth the grounds for protest, which shall include all the factual and legal documentation in support of the protest in sufficient detail to establish the merits of the protest; and
d) The desired resolution to the protest.

If the submitted protest does not comply with the requirements set forth herein, then it will not be considered for evaluation and will be returned to the protestor. Any grounds for protest not raised are waived. The protest may not be amended after filing. The protest is a public document. (2) Evaluation and Determination
No hearing will be held on the protest. City's Community Services Director, , will review the protest and any supporting material and conduct an investigation of the facts. He/she may, but need not, request other Bidders to submit statements or arguments regarding the protest and may discuss the protest with the protestor.

The Community Services Director shall issue a final written decision regarding any solicitation protest to each Bidder prior to Bid opening. The written decision will cite any actions that will or will not be taken in response to the protest. That decision shall be final, and there shall be no further administrative recourse.

B. Protest of Award
(1) Contents and Requirements
Following the opening of the Bids any unsuccessful Bidder, may protest City's proposed award of the Contract by submitting a protest to the Community Services Director no later than close of business on the on the fifth business day. That protest must be submitted in a timely manner, signed by the protesting Bidder, must and contain all of the following to be considered:
a) The name, address and telephone number of the protestor; and b) The Project Name and Project Number; and
c) The City action or recommendation that is being protested; d) A detailed statement setting forth every ground, reason, legal authority and facts in support of the protest, including all documents and evidence including specific references to parts

5.a
Packet Pg. 154 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 11 of the bid documents; and
e) A clear statement of the relief request.

A protest does not comply with the requirements set forth herein will be returned to the protestor. The protest shall not be amended after filing. Any grounds for protest not raised are waived. The protesting party must provide a copy of the protest to all other bidders at the same time as those are provided to the City. Failure to provide copies to other bidders shall nullify the protest.

Award Protest Statements are public documents.
(2) Evaluation and Determination
Any bidder may file a responsive statement in support of or in opposition to the protest within three (3) business days after the receipt of the protest from the protesting bidder. The Community Services Director shall review the facts and all submittals relative to the protest and shall issue a written decision setting forth the basis for such decision. The written decision will be issued to the protestor and to all affected parties.

Unless otherwise required by law, no hearing shall be provided. In the event a hearing is conducted, the Community Services Director shall issue written notice to the protestor and affected parties identifying the date and time for the hearing, along with rules concerning the hearing.

C. Delay in Award
Execution of any proposed contract may be delayed pending the resolution of the protest unless one or more of the following conditions is present:

1. The items or services being procured are urgently required;

2. Delivery or performance will be unduly delayed by failure to make award promptly; or

3. Failure to make prompt award will otherwise cause undue harm to City.

D. No Limitation on Remedies
Nothing contained herein shall be construed to act as a limitation on City's choice of remedies or confer any right upon any interested party or affected party to a remedy.

E. Basis for Choice of Remedy
In determining the appropriate remedy, the City shall consider all the circumstances surrounding the notice of bids and/or award, including, but not limited to:

1. The seriousness of any deficiency found to exist in the contracting process;

2. The effect of the action on the competitive process;

3. Any urgency surrounding the requirement to enter into a contract; and

5.a
Packet Pg. 155 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 12 4. The effect that implementing the remedy will have on the AGENCY.

F. Remedies
If the City determines that the award or proposed award was not made in accordance with applicable statutes, regulations, policies and/or procedures, the City, in its sole discretion, may grant any of the following remedies or any other remedy it deems appropriate:

1. Prior to award, City may issue a new solicitation, make a new selection/award recommendation, or award the contract consistent with applicable statutes, regulations, policies and procedures;

2. In its sole discretion, take no further action; or

3. Take any other action that is permitted by law to promote compliance.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

END OF PROPOSAL REQUIREMENTS

5.a
Packet Pg. 156 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 13 CITY OF EL CENTRO EQUAL OPPORTUNITY
The Civil Rights, Housing and Community Development and Age Discrimination Acts Assurances:

During the performance of this contract, the City of El Centro assures that no otherwise qualified person shall be excluded from participation or employment, denied program benefits, or be subjected to discrimination based on race, color, national origin, gender, age, disability, religion, familial status or religious preference, under any grant activity funded by Contract, as required by Title VI of the Civil Rights Act of 1964, Title I of the Housing and Community Development Act of 1974, as amended, the Age Discrimination Act of 1975, the Fair Housing Amendment Act of 1988, and all implementing regulations.

Rehabilitation Act of 1973 and the “504 Coordinator”
The City of El Centro further agrees to implement the Rehabilitation Act of 1973, as amended, and its regulations, 24 CFR Part 8, including, but not limited to, for Grantees with 15 or more permanent full or part time employees, the local designation of a specific person charged with local law enforcement of this Act, as the “504 Coordinator.” The Training Employment, and Contracting Opportunities for Business and Lower Income Persons Assurance of Compliances:

1. The grant activity to be performed under this contract is on a project assisted under a program providing direct Federal financial assistance from the Department of Housing and Urban Development and is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u.

Recipients, contractors and subcontractors shall direct their efforts to provide, to the greatest extent feasible, training and employment opportunities generated from the expenditure of Section 3 covered assistance to Section 3 residents in the order of priority provided in 24 CFR 135.34(a)(2).

2. The parties to this contract will comply with the provisions of said Section 3 and the regulations issued pursuant thereto by the Secretary of Housing and Urban Development set forth in 24 CFR Part 135, and all applicable rules and orders of the Department issued thereunder prior to the execution of this contract. The parties to this contract certify and agree that they are under no contractual or other disability, which would prevent them from complying with these requirements.

3. The City of El Centro will include these Section 3 clauses in every contract and subcontract for work in connection with the grant activity and will, at the direction of the State, take appropriate action pursuant to the contract or subcontract upon a finding that the City of El Centro or any contractor or subcontractor is in violation of regulations issued by the Secretary of Housing and Urban Development, 24 CFR Part 135 and, will not let any contract unless the City of El Centro or contractor or subcontractor has first provided it with a preliminary statement of ability to

5.a
Packet Pg. 157 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 14 comply with the requirements of these regulations.

4. Compliance with the provisions of Section 3, the regulations set forth in 24 CFR, Part 135, and all applicable rules and orders of the Department issued thereunder prior to the execution of this contract shall be a condition of the Federal financial assistance provided to the grant activity, binding upon the City of El Centro, its successors, and assigns. Failure to fulfill these requirements shall subject the City of El Centro, its contractors, subcontractors, successors and assigns to those sanctions specified by the contract through which Federal assistance is provided, and to such sanctions as are specified by 24 CFR Part 135.

Americans with Disabilities Act (ADA) of 1990
By signing this contract, the City of El Centro assures the State that it complies with the Americans with Disabilities Act (ADA) of 1990, (42 U.S.C. 12101 et seq.), which prohibits discrimination on the basis of disability, as well as all applicable regulations and guidelines issued pursuant to the ADA.

Assurances of Compliance with Requirements Placed on Construction Contract of Ten Thousand Dollars ($10,000) or More
The City of El Centro hereby agrees to place in every contract and subcontract for construction exceeding ten thousand dollars ($10,000) the Notice of Requirement for Affirmative Action to ensure Equal Employment Opportunity (Executive Order 11246), the Standard Equal Employment Opportunity and the Construction Contract Specifications. The City of El Centro furthermore agrees to insert the appropriate Goals and Timetables issued by the U.S. Department of Labor in such contracts and subcontracts.

5.a
Packet Pg. 158 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 15 PROPOSAL BID FORM
TO THE CITY OF EL CENTRO:

The undersigned hereby declares that he/she has carefully examined the location of the proposed work that he/she has examined the plans and specifications and read the accompanying instructions to bidders and hereby proposes to furnish all material except owner furnished materials, and labor and do all work required to complete the said work in accordance with said plans and specifications and special provisions for the unit prices set forth in the following schedule. The bidder shall furnish prices for all items shown in the proposal.

ITEM
NO.

LOCATION UNIT ITEM W/ UNIT PRICE
(WRITTEN IN WORDS)
TOTAL
(NUMBERS ONLY)

1. 623 W. Main Street
(APN: 053-104-018) LS

2. 617 W. Main Street
(APN: 053-104-019) LS

3. 510 W. Main Street
(APN: 053-111-013) LS

4. 474 W. Main Street
(APN: 053-113-024) LS

5. 444 W. Main Street
(APN: 053-113-018) LS

6. 559 W. Main Street
559a W. Main Street
(APN: 053-112-006)
LS

7. 561 W. Main Street
(APN: 053-112-041) LS
FAÇADE IMPROVEMENT PROGRAM PROJECT / El Centro, CA
For the total sum of:

Dollars
($ ), hereinafter called Base Bid Price
AWARD BASIS: The contract will be awarded based on the lowest responsive and responsible Base Bid Price as shown on Proposal Bid Form.

ADDITIVE BID ITEM
8 742 W. Main Street
(APN: 053-101-021
APN: 053-101-011)
LS

5.a
Packet Pg. 159 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 16 ADDITIVE BID NO 1 is identified as follows:

Add the Scope of Work for the painting of WomanHaven Thrift Store located at 742 W. Main (Line Item No. 8 on Proposal Bid Form) as depicted on the site photos.

Should the City of El Centro decide to add the work identified as ADDITIVE BID 1 to the Scope of Work of this project, the bidder proposes to increase the above Base Bid Price by the additive sum of
Dollars ($ ).

Is submitted herewith in accordance with the specifications.

1.00 – The undersigned hereby acknowledges the receipt of the following addendum:

None______; No. 1______; No. 2______; No. 3______; No. 4 ______; No. 5______

2.00 – The undersign hereby certifies that this proposal/bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation.

3.00 – The undersigned hereby accepts on the behalf of his firm all provisions and requirements of the contract documents, including but not limited to those related to time of completion and liquidated damages.

4.00 – The undersigned hereby certifies that they are authorized representative of the firm on whose behalf this proposal/bid is submitted and that they are acting at the direction and with the required approval of said firm, which is identified as follows:

Name of firm:

Address of firm:

Telephone
Number:
( ) Fax Number: ( )
Contractor’s License Number: Type:

Signed: Date:

END OF PROPOSAL/BID FORM

5.a
Packet Pg. 160 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 17 BID BOND
KNOW ALL MEN BY THESE PRESENTS:

THAT _____________________________________________, hereinafter called Principal, and _______________________________________, hereinafter called Surety, are jointly and severally held and firmly bound unto the City of El Centro, hereinafter called Owner, in the penal sum of ______________________________ dollars ($________________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, Principal is herewith submitting a bid for the work entitled “FAÇADE IMPROVEMENT PROGRAM.”
NOW, THEREFORE, the condition of this obligation is such that if Principal is awarded a contract for the work, and if Principal within the time specified in the bid enters into, executes and delivers to owner an agreement in the form provided herewith, and if Principal within the time specified in the bid gives to the owner the performance bond and the payment bond on the forms provided herewith, then this obligation shall be void. If, however, Principal shall fail or refuse to furnish, execute and deliver to owner said agreement in the time stated in the bid or should fail or refuse to furnish performance bond and payment bond in the time stated in the bid, then Principal and Surety shall forfeit to Owner the penal sum hereof.

AND, IT IS HEREBY DECLARED AND AGREED that Surety shall be liable under this obligation as Principal, and that nothing of any kind of nature whatsoever that will not discharge, Principal shall operate as a release of liability of Surety.

IN WITNESS WHEREOF, we have hereunto set our hands and sealed this ________day of _______________, 202___.

BY:

BY:

Insurance companies A.M. Best Company identifying number:

END OF BID BOND

5.a
Packet Pg. 161 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 18 PROPOSAL AGREEMENT
The undersigned agrees that this bid may not be withdrawn within a period of ninety (90) days from the opening thereof, and further agrees that in case of default in executing the required contract with necessary bonds with the ten (10) days, not including Sunday, after having received notice that the contract is ready for signature, the proceeds of the check or bond accompanying his/her bid shall become the property of the City of El Centro, California.

The certified or cashier's check, cash deposit or bid bond accompanying this proposal is in the amount of ten percent (10%) or more of the aggregate amount of this bid.

The undersigned is licensed in accordance with the Laws of the State of California.

License Number: Class:

Registration Number:

Company
Business Address
Telephone Number
Fax Number
Signature Bidder Date

END OF PROPOSAL

5.a
Packet Pg. 162 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 19 CITY OF EL CENTRO

CONSTRUCTION SERVICES AGREEMENT
This CONSTRUCTION SERVICES AGREEMENT (“Agreement”), is made and effective , 2023 by and between the City of El Centro, a municipal corporation ("CITY"), and , a Corporation ("CONTRACTOR"). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows:

I. SCOPE OF WORK
A. CONTRACTOR shall provide all labor, materials, equipment, and services required to perform the Statement of Work attached hereto as Exhibit A and incorporated herein by this reference. Furthermore, CONTRACTOR shall perform the Statement of Work in accordance with the Payment Schedule attached hereto as Exhibit B and incorporated herein by this reference.

B. All services and equipment shall be provided at the times and places designated by the CITY.

II. TIME FOR PROJECT COMPLETION
All of CONTRACTOR’s work on the Project shall be completed within durations established for the individual activities as set forth in the Project Schedule attached hereto as Exhibit C. All work shall commence within ten (10) calendar days after receiving a written Notice to Proceed from the CITY. The Project shall be completed within 45 calendar days, unless earlier terminated or extended as provided in Article 12.

III. THE CONTRACT SUM
Notwithstanding any provisions of this Agreement to the contrary, CITY and CONTRACTOR mutually agree that CITY's maximum cumulative payment obligation hereunder (including, but not limited to obligation for CONTRACTOR's costs and profit), shall be one ($ ) for the Scope of Work which shall include all amounts payable to CONTRACTOR for its labor, subcontracts, leases, materials, equipment, the deliverables, and costs arising from CONTRACTOR’s performance of this Agreement.

CONTRACTOR exceeds the maximum cumulative amount at its own risk and expense IV. PROGRESS PAYMENTS
A. For CONTRACTOR's full and complete performance of its obligations under this Agreement, and subject to the maximum cumulative payment obligation provisions set forth in Article 6 below, CITY shall pay CONTRACTOR in accordance with Exhibit B, Payment Schedule.

B. CONTRACTOR shall submit invoices monthly during the term of this

5.a
Packet Pg. 163 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 20 Agreement, based on the cost for services performed prior to the Invoice date. Invoices shall contain the following:
• Serial identification of progress bills: i.e., Progress Bill No. 1 for the first invoice, etc.
• The beginning and ending dates of the billing period
• A task summary containing the original contract amount, the amount of prior billings, the total due the current period, the balance available under the Agreement and the percentage of completion
• At CITY’s option, for each work item in each task, a copy of the applicable time entries or time sheets shall be submitted showing the name of the person doing the work, the hours spent by each person, and/ or a brief description of the work • The CONTRACTOR’s signature
C. Monthly Payment CITY shall make payments based on invoices received for services satisfactorily performed and may retain 5% of such amount. Notwithstanding, Public Contract Code Section 22300 permits the substitution of securities for any monies withheld by a public Agency to ensure performance under a contract, at the request and expense of the CONTRACTOR until completion of the term of the contract.

D. Final Payment CITY shall pay the last 5% of the total sum due pursuant to this Agreement within forty-five (45) days after acceptance of all satisfactory work under this Agreement.

E. Contractor Claims Any Contractor claims under this Agreement are subject to the provisions of Public Contract Code Section 9204, attached and incorporated here as Exhibit “D”.

V. INDEMNITY, DEFENSE AND HOLD HARMLESS AGREEMENT
CONTRACTOR shall indemnify, defend with legal counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR's negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the CITY. Should conflict of interest principles preclude a single legal counsel from representing both CITY and CONTRACTOR, or should CITY otherwise find CONTRACTOR’s legal counsel unacceptable, then CONTRACTOR shall reimburse the CITY its costs of defense, including without limitation reasonable legal counsels’ fees, expert fees and all other costs and fees of litigation. The CONTRACTOR shall promptly pay any final judgment rendered against the CITY (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the CONTRACTOR’s

5.a
Packet Pg. 164 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 21 negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

CONTRACTOR obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of CITY under any provision of this agreement, CONTRACTOR shall not be required to indemnify and hold harmless CITY for liability attributable to the active negligence of CITY, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where CITY is shown to have been actively negligent and where CITY active negligence accounts for only a percentage of the liability involved, the obligation of CONTRACTOR will be for that entire portion or percentage of liability not attributable to the active negligence of CITY.

VI. PREVAILING WAGES
Wage rates for this Project are covered by both Federal and state prevailing wage.

The contractor shall pay the higher of the two.

State Prevailing Wage: shall be in accordance with the “General Wage Determination Made By the Director of Industrial Relations Pursuant To California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770, 1773 and 1773.1", for Riverside County. Wage rates shall conform to those posted at the CITY offices and the Project site. Statutory provisions for penalties for failure to pay prevailing wages or to comply with State wage and hour laws will be enforced.

The following Labor Code sections are hereby referenced and made a part of this Agreement:

1. Section 1773.8 - Travel and Subsistence Pay

2. Section 1774 - Prevailing Wage Requirement

3. Section 1775 - Penalty for Failure to Comply with Prevailing Wage Rates

4. Section 1776 - Payroll Records (as applicable)

5. Section 1777.4 - Apprenticeship Requirements

6. Section 1777.5 - Apprenticeship Requirements

7. Sections 1810 and 1811 - Working Hour Restrictions

8. Section 1813 - Penalty for Failure to Pay Overtime

9. Section 1815 – Overtime Rate Requirement
Federal Prevailing wage
VII. RECORD AUDIT

5.a
Packet Pg. 165 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 22 Under California Government Code, Section 8546.7, if the amount of public funds expended under this Agreement exceeds ten thousand dollars ($10,000), any records or documents of both the CITY and the CONTRACTOR shall be subject to examination, audit, and/or copying at any time during regular business hours by the Auditor General for a period of three (3) years after final payment, upon oral or written request of the CITY.

VIII. CERTIFICATIONS
At the time of commencing work and throughout the Project duration, CONTRACTOR shall be in possession of a valid California State Contractor’s License with the following classifications: [Class-33 License]
Furthermore, CONTRACTOR shall ensure that any subcontractor working on the Project possesses at the time of commencing work and throughout the Project duration, a Contractor's License, issued by the State of California, which is current and in good standing.

If CONTRACTOR is a corporation, the undersigned hereby represents and warrants that the corporation is duly incorporated and in good standing in the State of , and that whose title is , is authorized to act for and bind the corporation.

IX. BONDING REQUIREMENTS
CONTRACTOR shall deliver to the CITY two fully executed, identical counterparts of the Performance Bond and Payment (Labor and Materials) Bond. Each bond shall be for one hundred percent (100%) of the Contract Price. The surety insurer shall be admitted to transact surety business in the State of California, in accordance with Code of Civil Procedure section 995.120. Personal sureties and unregistered surety companies are unacceptable. Failure to furnish a bond within the time requirements may result in the forfeiture of the Bid Guarantee at the sole discretion of City.

X. CONTRACTOR'S FAILURE TO PROCURE COMPLETION OF PROJECT In the event CONTRACTOR fails to furnish tools, equipment, or labor in the necessary quantity or quality, or fails to prosecute the work or any part thereof contemplated by this Agreement in a diligent and workmanlike manner, and if the CONTRACTOR for a period of three (3) calendar days after receipt of written demand from CITY or its designated representative to do so, fails to furnish tools, equipment, or labor in the necessary quantity or quality, and to prosecute its work and all parts thereof in a diligent and workmanlike manner, or after commencing to do so within said three (3) calendar days, fails to continue to do so; then the CITY may exclude the CITY from the premises, or any portion thereof, and take possession of said premises or any portion thereof, together with all material and equipment thereon, and may complete the work

5.a
Packet Pg. 166 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 23 contemplated by this Agreement or any portion of said work, either by furnishing the tools, equipment, labor or material necessary, or by letting the unfinished portion of said work, or the portion taken over by the CITY to another contractor or by a combination of such methods. In any event, the procuring of the completion of said work, or the portion thereof taken over by the CITY, shall be a charge against the CONTRACTOR, and may be deducted from any money due or becoming due to CONTRACTOR from the CITY, or the CONTRACTOR shall pay the CITY the amount of said charge, or the portion thereof unsatisfied. The sureties, provided for under this Agreement shall become liable for payment should CONTRACTOR fail to pay in full any said cost incurred by the CITY.

XI. INSURANCE
Prior to the beginning of and throughout the duration of the Work, CONTRACTOR and its subcontractors shall maintain insurance in conformance with the requirements set forth below. CONTRACTOR will use existing coverage to comply with these requirements. If that existing coverage does not meet the requirements set forth herein, CONTRACTOR agrees to amend, supplement or endorse the existing coverage to do so.

CONTRACTOR shall not allow any subcontractor to commence work on any subcontract until CONTRACTOR has obtained all insurance required herein for the subcontractor(s) and provided evidence thereof to DISRICT. Verification of the required insurance shall be submitted and made part of this Agreement prior to execution. All insurance coverage and limits provided by CONTRACTOR and available or applicable under this Agreement are intended to apply to the full extent of the policies. Nothing contained in this Agreement limits the application of such insurance coverage.

CONTRACTOR acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to CONTRACTOR or its subcontractors in excess of the limits and coverage identified in this Agreement and which is applicable to a given loss, claim or demand, will be equally available to CITY.

A. CONTRACTOR shall provide the following types and amounts of insurance:

Without limiting CONTRACTOR’s indemnification of CITY, and prior to commencement of Work, CONTRACTOR shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to CITY.

General liability insurance CONTRACTOR shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.

5.a
Packet Pg. 167 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 24 Automobile liability insurance CONTRACTOR shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the CONTRACTOR arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.

Umbrella or excess liability insurance [Optional depending on limits required] CONTRACTOR shall obtain and maintain an umbrella or excess liability insurance that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability and employer’s liability. Such policy or policies shall include the following terms and conditions:
• A drop down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason;
• Pay on behalf of wording as opposed to reimbursement; • Concurrency of effective dates with primary policies; • Policies shall “follow form” to the underlying primary policies; and • Insureds under primary policies shall also be insureds under the umbrella or excess policies.

Workers’ compensation insurance CONTRACTOR shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for CONTRACTOR’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, CONTRACTOR shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees.

CONTRACTOR shall submit to CITY, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of CITY, its officers, agents, employees and volunteers.

Pollution liability insurance Environmental Impairment Liability Insurance shall be written on a CONTRACTOR’s Pollution Liability form or other form acceptable to CITY providing coverage for liability arising out of sudden, accidental and gradual pollution and remediation. The policy limit shall be no less than $1,000,000 dollars per claim and in the aggregate. All activities contemplated in this Agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for the hauling of waste from the project site to the final disposal location, including non-owned disposal sites.

5.a
Packet Pg. 168 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 25 Products/completed operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the insurer. The CITY, its officials, officers, agents, and employees, shall be included as insureds under the policy.

Unless waived by the City in writing, Builder’s risk insurance Upon commencement of construction and with approval of CITY, CONTRACTOR shall obtain and maintain builder’s risk insurance for the entire duration of the Project until only the CITY has an insurable interest. The Builder’s Risk coverage shall include the coverages as specified below.

The named insureds shall be CONTRACTOR and CITY, including its officers, officials, employees, and agents. All Subcontractors (excluding those solely responsible for design Work) of any tier and suppliers shall be included as additional insureds as their interests may appear. CONTRACTOR shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to CITY. The policy shall contain a provision that all proceeds from the builder’s risk policy shall be made payable to the CITY. The CITY will act as a fiduciary for all other interests in the Project.

Policy shall be provided for replacement value on an "all risk" basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, Nonconforming Work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sublimits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site or any staging area. Such insurance shall be on a form acceptable to CITY to ensure adequacy of terms and sublimits and shall be submitted to the CITY prior to commencement of construction.

Other provisions or requirements
a. Proof of insurance CONTRACTOR shall provide certificates of insurance to CITY as

5.a
Packet Pg. 169 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 26 evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by CITY’s risk manager prior to commencement of performance. Current certification of insurance shall be kept on file with CITY at all times during the term of this contract. CITY reserves the right to require complete, certified copies of all required insurance policies, at any time. b. Duration of coverage CONTRACTOR shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by CONTRACTOR, his agents, representatives, employees or subcontractors.

CONTRACTOR must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims.

CITY and its officers, officials, employees, and agents shall continue as additional insureds under such policies.
c. Primary/noncontributing Coverage provided by CONTRACTOR shall be primary and any insurance or self-insurance procured or maintained by CITY shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of CITY before the CITY’s own insurance or self-insurance shall be called upon to protect it as a named insured.
d. CITY’s rights of enforcement In the event any policy of insurance required under this Agreement does not comply with these requirements or is canceled and not replaced, CITY has the right but not the duty to obtain the insurance it deems necessary and any premium paid by CITY will be promptly reimbursed by CONTRACTOR or CITY will withhold amounts sufficient to pay premium from CONTRACTOR payments. In the alternative, CITY may cancel this Agreement. e. Acceptable insurers All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the CITY’s risk manager.
f. Waiver of subrogation All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow CONTRACTOR or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. CONTRACTOR hereby waives its own right of recovery against CITY, and shall require similar written express waivers and insurance clauses from each of its subconsultants.

5.a
Packet Pg. 170 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 27 g. Enforcement of contract provisions (non estoppel). CONTRACTOR acknowledges and agrees that any actual or alleged failure on the part of the CITY to inform CONTRACTOR of non-compliance with any requirement imposes no additional obligations on the CITY nor does it waive any rights hereunder. h. Requirements not limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance.

Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the CONTRACTOR maintains higher limits than the minimums shown above, the CITY requires and shall be entitled to coverage for the higher limits maintained by the CONTRACTOR. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the CITY. i. Notice of cancellation. CONTRACTOR agrees to oblige its insurance agent or broker and insurers to provide to CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.
j. Additional insured status. General liability policies shall provide or be endorsed to provide that CITY and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies.
k. Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to CITY and approved of in writing.
l. Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that CONTRACTOR’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.
m. Pass through clause. CONTRACTOR agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by CONTRACTOR, provide the same minimum insurance coverage and endorsements required of CONTRACTOR. CONTRACTOR agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section.

CONTRACTOR agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to CITY for review.

5.a
Packet Pg. 171 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 28 n. CITY’s right to revise requirements. The CITY reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the CONTRACTOR a ninety (90) day advance written notice of such change. If such change results in substantial additional cost to the CONTRACTOR, the CITY and CONTRACTOR may renegotiate CONTRACTOR’s compensation. o. Self-insured retentions. Any self-insured retentions must be declared to and approved by CITY. CITY reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by CITY. p. Timely notice of claims. CONTRACTOR shall give CITY prompt and timely notice of claims made or suits instituted that arise out of or result from CONTRACTOR’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
q. Additional insurance. CONTRACTOR shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work. r. Claims-made limitations. The following provisions shall apply if any of the required policies are written on a claims-made basis:
i. The retroactive Date of the policy must be shown and must be before the date of the Agreement or the beginning of the contracted work. ii. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the Agreement or the work. iii. If coverage is canceled or not renewed and it is not replaced with another claims-made policy form with a Retroactive Date that precedes the date of this Agreement, CONSULTANT must provide extended reporting coverage for a minimum of five (5) years after completion of the Agreement or the work. The CITY shall have the right to exercise, at the CONSULTANT'S sole cost and expense, any extended reporting provisions of the policy, if the CONSULTANT cancels or does not renew the coverage.
iv. A copy of the claim reporting requirements must be submitted to the CITY prior to the commencement of any work under this Agreement.

XII. REGISTRATION REQUIREMENTS
Pursuant to Section 1771.1(a) of the Labor Code, CONTRACTOR must be registered with the Department of Industrial Relations (DIR) of the State of California in order to be eligible to work on public works projects. CONTRACTOR must ensure registration with the DIR that is active and in good standing.

No contractor or subcontractor may be listed on a bid proposal for a public works

5.a
Packet Pg. 172 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 29 project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

If CONTRACTOR is not required to register with the Department of Industrial Relations due to the Small Project Exemption, Effective July 1, 2017, CONTRACTOR is still required to maintain certified payroll records on a continuous basis, and provide them to the Labor Commissioner’s Office upon request. Certified payroll records will be provided by CONTRACTOR to CITY upon request.

XIII. PROVISIONS REQUIRED BY LAW
Each and every provision of law and clause required by law to be inserted in this Agreement shall be deemed to be inserted herein and the Agreement shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not currently inserted, then upon application of either party the Agreement shall forthwith be physically amended to make such insertion or correction.

No waiver of any term or condition of this Agreement shall be a continuing waiver thereof.

Clayton and Cartwright Acts: The CONTRACTOR and any and all subcontractors offer and agree to assign to the CITY all rights, title and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Profession Code) arising from purchases of goods, services or materials pursuant to the public works contract or any subcontract.

Trenching: For any jobs involving trenching more than four (4) feet deep, the CONTRACTOR shall notify the CITY of hazardous materials, subsurface or latent physical site conditions different from those indicated in information about the site made available to bidders, as well as unusual site conditions and the CITY shall investigate those as required by Public Contracts Code Section 7104 XIV. SUBSURFACE HAZARDOUS MATERIALS
A. In the event trenches or other excavations extend deeper than four (4) feet below the surface, the CONTRACTOR shall promptly, and before the following conditions are disturbed, notify the CITY in writing of any:

1. Material that the CONTRACTOR believes may be material that is hazardous

5.a
Packet Pg. 173 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 30 waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II or Class III disposal site in accordance with the provisions of existing law.

2. Subsurface or latent physical conditions at the site differing from those indicated.

3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in the Work or the character provided for in the CONTRACT.

B. Upon receipt of said notification the CITY will investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the CONTRACTOR's cost of or the time required for performance of any part of the work, the CITY will issue a change order under the procedures described in the General Conditions.

C. In the event that a dispute arises between the CITY and the CONTRACTOR whether the conditions materially differ, or involve hazardous waste or cause a decrease or increase in the CONTRACTOR's cost of or time required for performance of any part of the work, the CONTRACTOR shall not be excused from any scheduled completion date provided for by the Agreement, but shall proceed with all work to be performed under the Agreement. The CONTRACTOR shall retain any and all rights provided either by Agreement or by law that pertain to the resolution of disputes and protests between the contracting parties
XV. LIQUIDATED DAMAGES
Pursuant to Government Code Section 53069.85, if work is not completed within the contract time or in strict accordance with the Project Schedule, it is understood, acknowledged and agreed that the CITY will suffer damage. It is therefore agreed that the CONTRACTOR shall pay to the CITY the sum of Five Hundred ($500.00) for each and every calendar day of delay beyond the Contract Time, or beyond any completion schedule, construction schedule or Project milestones established in or pursuant to the Project Schedule, or beyond the time indicated in the Project Schedule for any individual Contract activity.

CONTRACTOR expressly understands, acknowledges and agrees that such liquidated damages can and shall be imposed if the CONTRACTOR does not meet each and every aspect of any activity schedule, completion schedule, construction schedule or Project milestones established in or pursuant to the Project Schedule. If the CITY accepts work or makes any payment under this Agreement after a default by reason of delays, the acceptance of such work and/or payment(s) shall in no respect constitute a waiver or modification of any provisions regarding Contract Time, a completion schedule, the Project Schedule or the accrual of liquidated damages. In the event the same is not paid, the CONTRACTOR further agrees that the CITY may deduct the amount thereof from any money due or that may become due the CONTRACTOR under the Agreement. This Article does not exclude recovery of damages under provisions of the Contract

5.a
Packet Pg. 174 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 31 Documents, and is expressly in addition to the CITY’s ability to seek other damages.

CONTRACTOR is to refer to Section II, Project Construction Schedule for duration of individual activities. Liquidated damages may be assessed if any individual activity duration exceeds the time indicated for that activity on the Project Construction Schedule.

XVI. CLAIM PROCEDURES UNDER PUBLIC CONTRACT CODE SECTION 9204 CONTRACTOR shall comply with the procedure set forth in Public Contracts Code section 9204 (attached and incorporated as Exhibit A) for any claim, as that term is defined therein, for one or more of the following: 1) a time extension, including, without limitation, for relief from damages or penalties for delay, 2) payment of money or damages arising from work done pursuant to this Agreement, and/or 3) payment of an amount disputed by the AGENCY under this Agreement.

XVII. COMPONENT PARTS OF THE CONTRACT
A. The complete Agreement shall consist of the following component parts, to-wit:

This Agreement; Amendments, if any; the accepted CONTRACTOR’s bid/proposal, dated November 17, 2022, including all required attached documents; each of the component parts of the “Façade Improvement Program”, IFB Solicitation, dated , 2023; and the addenda, if any. Agreement between CITY and CONTRACTOR and the said other documents are as fully a part of this Agreement as if hereto attached or herein repeated.

This instrument and the other documents mentioned above in this Article 1 constitute the complete and exclusive statement of the term(s) and condition(s) of the Agreement between CITY and CONTRACTOR and it supersedes all prior representations, understandings, and communications. The invalidity in whole or in part of any term or condition of this Agreement shall not affect the validity of other term(s) or condition(s).

B. In the event of any discrepancy between or among the portions of the Agreement Documents, the following shall take precedence: (a) Change Orders/ Amendments/ Modifications; (b) this Agreement; (c) the accepted CONTRACTOR’s bid/proposal; (d) Addenda, if any; and (e) the solicitation, dated , 2023.

C. CITY's failure to insist in any one or more instances upon CONTRACTOR's performance of any term(s) or condition(s) of this Agreement shall not be construed as a waiver or relinquishment of CITY's right to such performance or to future performance of such term(s) or condition(s) and CONTRACTOR's obligation in respect thereto shall continue in full force and effect. Changes to any portion of this Agreement shall not be binding upon CITY except when specifically authorized by signed written amendment to this Agreement issued in accordance with the provisions of this Agreement.

D. All days set out here shall be calendar days unless otherwise specified.

5.a
Packet Pg. 175 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 32 XVIII. ENTIRE CONTRACT
This Contract constitutes the entire contract of the parties. No other Contracts or contracts, whether oral or written, pertaining to the work to be performed, exist between the parties. This Contract can be modified only by an amendment in writing, signed by both parties. No waiver of any term or condition of this Agreement shall be a continued waiver thereof.

CONTRACTOR CITY
City of El Centro
By: ____________________________ By: ____________________________ Title: __________________________ Title: __________________________ Date: __________________________ Date: __________________________ ATTACHMENTS:

Non-collusion Affidavit
Faithful Performance Bond

5.a
Packet Pg. 176 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 33 EXHIBIT A
Public Contract Code Section 9204:
(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project.
(B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled.
(C)Payment of an amount that is disputed by the public entity. (2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project.
(3) (A) “Public entity” means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, CITY, special CITY, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.
(B) “Public entity” shall not include the following:

5.a
Packet Pg. 177 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 34 (i) The Department of Water Resources as to any project under the jurisdiction of that department.
(ii) The Department of Transportation as to any project under the jurisdiction of that department.
(iii) The Department of Parks and Recreation as to any project under the jurisdiction of that department.
(iv)The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(v) The Military Department as to any project under the jurisdiction of that department.
(vi)The Department of General Services as to all other projects. (vii) The High-Speed Rail Authority.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.
(5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor.
(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed.

Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C)If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to

5.a
Packet Pg. 178 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 35 provide the claimant a written statement identifying the disputed portion and the undisputed portion.
(D)Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. (2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C)For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. (D)Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration

5.a
Packet Pg. 179 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 36 Program, if mediation under this section does not resolve the parties’ dispute. (3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.
(i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2027, deletes or extends that date.

5.a
Packet Pg. 180 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 37 FAITHFUL PERFORMANCE BOND
Whereas, CITY OF EL CENTRO, State of California, and ___________________ (hereinafter designated as “Principal”) have entered into an agreement whereby principal agrees to and complete certain designated improvements, which said agreement, dated _______________, 2023, and identified as project Façade Improvement Program, is hereby referred to and made a part hereof; and
Whereas, said Principal is required under the terms of said agreement to furnish a bond for the faithful performance of said agreement.

Now, therefore, we, the Principal and ___________________, as surety, are held and firmly bound unto the CITY OF EL CENTRO (hereinafter called (“City”), in the penal sum of _____________________ dollars ($____________) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.

The condition of this obligation is such that if the above-bounded Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the said agreement and any alteration thereof made as therein provided, on his or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless CITY OF EL CENTRO, its officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney’s fees, incurred City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the agreement or to the work to be performed thereunder or the specifications accompanying the same shall in anywise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the agreement or to the work or to the specifications.

In witness whereof, this instrument has been duly executed by the principal and surety above named, on ____, 2023.
_______________________________
Principal
By: ____________________________
_______________________________
Surety
By: ____________________________
Its Attorney-in-Fact

END OF FAITHFUL PERFORMANCE BOND

5.a
Packet Pg. 181 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 38 LABOR AND MATERIALS BOND
Whereas, the CITY OF EL CENTRO, State of California, and _________________ (hereinafter designated as “the Principal”) have entered into an agreement whereby the principal agrees to install and complete certain designated public improvements, which agreement, dated ____, 2023, and identified as project Façade Improvement Program, is hereby referred to and made a part hereof; and
Whereas, under the terms of the agreement, the Principal is required before entering upon the performance of the work, to file a good and sufficient payment bond with the City of El Centro to secure the claims to which reference is made in Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code.

Now, therefore, the Principal and the undersigned as corporate surety and admitted surety insurer, are held firmly bound unto the City of El Centro (“City”) and all contractors, subcontractors, laborers, material suppliers, and other persons employed in the performance of the agreement and referred to in Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code in the sum of ________________ dollars ($_________), for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to this work or labor, that the surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorney’s fees, incurred by City in successfully enforcing this obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Title 3 (commencing with Section 9000) of Part 6 of Division 4 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension, alteration, or addition.

In witness whereof, this instrument has been duly executed by the principal and surety above named, on ____, 2023.
_______________________________ _____________________________ Principal Surety
By: ____________________________ By: __________________________ Its Attorney-in-Fact

5.a
Packet Pg. 182 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 39 END OF LABOR AND MATERIALS BOND
WORKERS’ COMPENSATION INSURANCE CERTIFICATE
The Contractor shall execute the following form as required by Labor Code §§1860 and 1861:

I am aware of the provisions of section 3700 of the Labor Code, which requires every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions before commencing the performance of the work of this contract.
_____________________________ ____________________________ Date Contractor’s Name
____________________________
Contractor’s Signature
____________________________
Title
ATTEST:

By _____________________________
Signature
_____________________________
Title
END OF WORKERS’ COMPENSATION INSURANCE CERTIFICATE

5.a
Packet Pg. 183 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 40 DRUG/ALCOHOL TESTING REQUIREMENTS
The Contractor shall execute the following form as required by the Federal Drug and Alcohol, section 49 CFR Part 382.

I agree to comply with the provisions of Federal Omnibus Transportation Employee Testing Act of 1991, and that I will administer a program of alcohol and drug testing of all commercial vehicle operators, as required by Federal Regulations.

Contractor certifies compliance with the City of El Centro’s Drug and Alcohol Free Workplace Policy as a condition of the State Drug-Free Workplace Act of 1990 (Government Code section 8350 et seq.) and the Federal Drug Free Workplace Act of 1988 (41 U.S.C.A. section 701 et seq.) In addition, Contractor agrees to submit a copy of its own drug free workplace policy.

Dated_____________________________ __________________________________ Contractor’s Name
__________________________________
Contractor’s Signature
__________________________________
Title

END OF DRUG/ALCOHOL TESTING REQUIREMENTS

5.a
Packet Pg. 184 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 41 SUBCONTRACTORS LISTING
The Bidder shall list below the name and the location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent (.005%) of the prime contractor’s total bid. The Bidder shall also list below the portion of the work which will be done by each subcontractor under this Contract. The prime contractor shall list only one subcontractor for each portion of the WORK.

If the Bidder does NOT intend to use ANY subcontractors, then state “NONE” in the first block.

The Bidder’s attention is directed to the provisions of the section entitled “Subcontract Limitations” of the Supplementary General Conditions, which stipulates the percent of the WORK to be performed with the Bidders’ own forces. Failure to comply with this requirement will render the Bid non-responsive and may cause its rejection.

PORTION OF WORK NAME/State Contractor
License No/DIR Registration
No

PLACE OF BUSINESS
ADDRESS/TELEPHONE No.
* No subcontractor will be used for this project.
*Indicate if no subcontractor will be used.

END OF SUBCONTRACTORS LISTING

5.a
Packet Pg. 185 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 42 NON-COLLUSION DECLARATION FOR CORPORATION
The undersigned declares:

I am the of , the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham.

The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true.

The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on [date], at [city], [state].”

END OF NONCOLLUSION DECLARATION FOR CORPORATION

5.a
Packet Pg. 186 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 43 CORPORATE CERTIFICATION OR PARTNERSHIP INFORMATION
Name of Corporation or Partnership
_________________________________________________
State of Incorporation
_____________________________________________________________ List names and addresses of each partner, or titles, names and business addresses of President, Secretary and Treasurer.
____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ Date_____________________________ Contractor____________________________ Signature_________________________ Title________________________________ ATTEST:
________________________________________
Signature by
________________________________________
Title

END OF CORPORATE CERTIFICATION

5.a
Packet Pg. 187 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 44 CONTRACTOR’S CERTIFICATION OF QUALIFICATION

FOR LICENSE CLASSIFICATION
After award of the contract, the Contractor, whether an individual, co-partnership, limited partnership, corporation, or any other combination or organization, shall execute the following form:

1. If an individual, I hereby certify that I am, or my responsible managing employee ________________________ (insert name) is, qualified for the license classification called for in these contract documents.

2. If a co-partnership or limited partnership, the general partner hereby certifies that the general partner _______________________________ (insert name), or responsible managing employee __________________________________ (insert name), is qualified for the license classification called for in these contract documents.

3. If a corporation, or any other combination or organization, the responsible managing officer _______________________________ (insert name), or a responsible managing employee ________________________________ (insert name), is qualified for the license classification called for in these contract documents.

If the individual who qualifies the Contractor for the license classification called for in these contract documents changes during the progress of the work, then Contractor shall, within seven (7) days of any such change, notify the Director of Public Works in writing of such change, including the name, license number and status of the individual.

For the purpose of this Certification, a responsible managing employee shall mean an individual who is a bona fide employee of the Contractor and is actively engaged in the classification of work for which that individual is the qualifying person on behalf of the Contractor under California law.

DATED:____________________ CONTRACTOR:___________________________________ SIGNATURE:_____________________________ TITLE:______________________________ ATTEST:

SIGNATURE BY:___________________________________________ TITLE:____________________________________________________

5.a
Packet Pg. 188 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 45 CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY,

AND VOLUNTARY EXCLUSION

LOWER TIER COVERED TRANSACTIONS

NONDEBARMENT CERTIFICATION
(TO BE COMPLETED AND SUBMITTED WITH BID)
This certification is required by the regulations implementing Executive Order 12549, Debarment and Suspension, 29 CFR Part 98, section 98.510, Participants’ Responsibilities. The regulations were published as Part VII of the May 26, 1988 Federal Register (pages 19160 – 19211). (BEFORE COMPLETING CERTIFICATION, READ INSTRUCTIONS FOR CERTIFICATION) (1) The prospective recipient of Federal assistance funds certifies, by submission of this proposal, that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from participation in this transaction by any Federal department or agency.
(2) Where the prospective recipient of Federal assistance funds is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal.

Organization
Name & Title of Authorized Representative
Signature Date

5.a
Packet Pg. 189 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 46 INSTRUCTIONS FOR CERTIFICATION REGARDING DEBARMENT

1. By signing and submitting this proposal, the prospective recipient of Federal assistance funds is providing the certification as set out below.

2. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective recipient of Federal assistance funds knowingly rendered an erroneous certification, in addition to other remedies available to the Federal government, the Department of Labor (“DOL”) may pursue available remedies, including suspension and/or debarment.

3. The prospective recipient of Federal assistance funds shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective recipient of Federal assistance funds learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

4. The terms “covered transaction,” “debarred,” “suspended,” “ineligible,” “lower tie covered transaction,” “participant,” “person,” “primary covered transaction,” ”principal,” “proposal” and “voluntarily excluded” as used in this clause have the meanings set out in the definitions and coverage sections of rules implementing Executive Order 12549. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations.

5. The prospective recipient of Federal assistance funds agrees by submitting the proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible or voluntarily excluded from participation in this covered transaction, unless authorized by the DOL.

6. The prospective recipient of Federal assistance funds further agrees by submitting this proposal that it will include the clause titled “Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions,” without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.

7. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant may decide the method and frequency by which it determines the eligibility of its principals. Each participant may, but it is not required to, check the List of Parties Excluded from Procurement or Non-procurement Programs.

8. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

9. Except for transactions authorized under section 5 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal government, the DOL may pursue available remedies, including suspension and/or debarment.

5.a
Packet Pg. 190 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 47 Section 3 of the Housing & Urban Development Act of 1968 This project is funded in part by the Community Development Block Grant and as such requires compliance with Section 3 regulations. Any contractor bidding this project will be required to follow the guidelines set below to be considered for responsiveness to the Section 3 requirements.

What is Section 3?
Section 3 is a provision of the Housing and Urban Development Act of 1968, which recognizes that Housing and Urban Development (“HUD”) funds are typically one of the largest sources of Federal funding expended in communities through the form of grants, loans, entitlement allocations and other forms of financial assistance. Section 3 is intended to ensure that when employment or contracting opportunities are generated because a covered project or activity necessitates the employment of additional persons or the awarding of contracts for work, preference must be given to low- and very low-income persons or business concerns residing in the community where the project is located.

What is a Section 3 covered project?
A Section 3 covered project involves the construction or rehabilitation of housing (including reduction of lead-based paint hazards) or other public construction such as street repair, sewage line repair or installation, updates to building façades, etc.

How does Section 3 differ from the Minority Business Enterprise/Women Business Enterprise program?
Section 3 is both race and gender neutral. The preferences provided under this regulation are based on income-level and location. The Section 3 regulations were designed to encourage recipients of HUD funding to direct new employment and contracting opportunities to low-income residents and the businesses that employ these persons within their community regardless of race and/or gender.

Please contact HUD’s Office of Small and Disadvantaged Business Utilization at (202) 708-1428 to learn more about these programs.

Note: This project also has MBE/WBE usage requirements.

What does the term Section 3 Business Concern mean?
Section 3 business concerns are businesses located in the metropolitan area or non-metropolitan county in which the Section 3 covered assistance is expended that can provide evidence that they meet one of the following:
a) Fifty-one percent (51%) or more owned by Section 3 residents; or b) At least thirty percent (30%) of its full-time employees include persons that are currently Section 3 residents, or within three (3) years of the date of first employment with the business concern were Section 3 residents; or
c) Provides evidence, as required, of a commitment to subcontract in excess of twentyfive percent (25%) of the dollar award of all subcontracts to be awarded to business concerns that meet the qualifications in the above two (2) sections.

5.a
Packet Pg. 191 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 48 What does the term “Section 3 resident” mean?
A “Section 3 resident” is: 1) a public housing resident; or 2) a low- or very low-income person residing in the metropolitan area or non-metropolitan county in which the Section 3 covered assistance is expended.

How is “low-income” determined?
The term “low-income” is used in the Section 3 regulation to include both low- and very lowincome individuals. Local income levels can be obtained online at:
https://www.huduser.gov/portal/datasets/il.html. The Income Levels for the Imperial County have also been incorporated into this bid document on page 36 for your use.

What is a “new hire”?
A new hire means a full-time employee for a new permanent, temporary or seasonal position that is created during the expenditure of Section 3 covered financial assistance.

Preference for Contracting with Section 3 Business Concerns The City, in compliance with Section 3 regulations, will require contractors and subcontractors (including professional service contractors) to direct their efforts towards contracts to Section 3 business concerns in the following order to priority:
• Category 1: Business concerns that are fifty-one percent (51%) or more owned by residents of the housing development for which the work is performed, or whose fulltime, permanent workforce includes thirty percent (30%) of these persons as employees.
• Category 2: Business concerns that are fifty-one percent (51%) or more owned by residents of the Authority’s public housing development(s) other than the housing development where the work is to be performed; or whose full-time permanent workforce includes thirty percent (30%) of these persons as employees. • Category 3: Business concerns that are fifty-one percent (51%) or more owned by a Section 3 resident(s), or whose permanent, full-time workforce includes no less than thirty percent (30%) Section 3 residents (category 4 business); or that subcontract in excess of twenty-five percent (25%) of the total amount of subcontracts to Section 3 business concerns.

Contractors and subcontractors are expected to extend to the greatest extent feasible, efforts to achieve the numerical goals established by the City.

Contractor’s Requirements in Employing Section 3 participants:

Under the Section 3 Program, contractors and subcontractors are required to:
• Provide employment opportunities to Section 3 residents/participants in the priority order listed below:
a) Category 1 – Section 3 Resident

5.a
Packet Pg. 192 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 49 Residents of the housing development or developments for which the contract shall be expended.
b) Category 2 – Section 3 Resident
Residents residing in the City of El Centro who meet the income guidelines for Section 3 preference (refer to Section 3 Income Limits). c) Category 3 – Section 8 Resident
Residents of Section 8 of the Imperial Valley Housing Authority.

Contractors Requirements to Inform the City of El Centro The Contractor must inform the City at the time of bid, which work will be performed by Section 3 participants, by providing the following:
o Names of the Section 3 business concerns to be utilized, o Estimates of the number of employees to be utilized for contract, o Projected number of available positions, to include job descriptions and wage rates (construction wages consistent with Davis-Bacon and/or California prevailing wage)
o Efforts that will be utilized to seek Section 3 participants. o Documentation of good faith effort (Described below)
Resident Hiring Requirements
The following scale for resident hiring is to be used on all construction contracts, service contracts and professional service contracts that contain a labor component. It is expected that an appropriate number of residents with particular qualifications or a willingness to begin unskilled labor will be able to participate in the City contracted labor efforts. A prime contractor may satisfy resident hiring requirements through its subcontractors.

TOTAL LABOR DOLLARS

USE TOTAL CONTRACT

AMOUNT FOR SERVICE CONTRACTS
RESIDENT AS A % OF

TOTAL LABOR

DOLLARS
Labor dollars $25,000 but less than $100,000 10% of the labor dollars $100,000, but less than $200,000 9% of the labor dollars At least $200,000, but less than $300,000 8% of the labor dollars At least $300,000, but less than $400,000 7% of the labor dollars At least $400,000, but less than $500,000 6% of the labor dollars At least $500,000, but less than $1 million 5% of the labor dollars At least $1 million, but less than $2 million 4% of the labor dollars At least $2 million, but less than $4 million 3% of the labor dollars At least $4 million, but less than $7 million 2% of the labor dollars $7 million or more 1.5% of the labor dollars
With this sliding formula, it is expected that an appropriate number of neighborhood residents and

5.a
Packet Pg. 193 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 50 Imperial Valley Public Housing residents and with particular qualifications or willingness to begin unskilled labor will be able to participate in contracted labor efforts. A prime contractor, through its subcontractor(s), may satisfy El Centro resident hiring requirement set forth above by the following means:

1. Subcontract or joint venture with a resident owned business. The business must be fifty-one percent (51%) or more owned by public housing residents, or subcontract/joint venture with a business that employs full-time thirty percent (30%) or more low and very-income individuals within the City of El Centro, or

2. Direct hiring of City of El Centro public housing residents and/or low and very lowincome neighborhood residents based on the Resident Hiring Scale, or

3. Contractor incurs the cost of providing skilled training for residents in an amount commensurate with the sliding scale set forth in the Resident Hiring Scale, or

4. Contractor makes a contribution to an Education Fund to provide assistance to residents to obtain training. The level of contribution would be commensurate with the sliding scale set forth in the Resident Hiring Scale.

Where can I find Section 3 businesses?
Some of the resources recommended for assistance in locating Section 3 contractors include:

Caltrans Civil Rights Program
Business Enterprise Program
(916) 324-1700 or toll free at 1-866-810-6346
Civil Rights Website: http://www.dot.ca.gov/hp/bep
Small Business Administration
550 W. C St, Suite 550
San Diego, CA
Imperial Valley Housing Authority
1401 D St.

Brawley, CA
Employment Development Department
1550 W. Main St.

El Centro, CA
Where can I find Section 3 residents?
Some of the resources recommended for assistance in locating Section 3 residents include:

Imperial Valley Housing Authority
1401 D St.

Brawley, CA

5.a
Packet Pg. 194 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 51 Employment Development Department
1550 W. Main St.

El Centro, CA
Posting for acceptance of job applications from Section 3 residents will be required at the construction site.

What Section 3 documentation is required to be submitted with the bid proposal? In order to be a responsible and/or responsive, a bidder must make good faith efforts to hire the required level of Section 3 business concerns, Section 3 residents, or both. This requirement can be met in either of two ways. First, the bidder can meet the goal, documenting the hiring of Section 3 business concerns or residents. Second, if the bidder will be unable to make the Section 3 goal, it can document adequate good faith efforts. This means that the bidder must show that it took all necessary and reasonable steps to achieve the Section 3 requirement which, by their scope, intensity and appropriateness to the objective, could reasonably be expected to obtain sufficient Section 3 participation, even if they were not fully successful.

Because all subcontractors must be listed on page 42 of this bid packet titled “Bidder Section 3 Commitment for Construction Contracts,” any Section 3 Business Concerns being utilized for the construction project will need to be located prior to the submittal of the bid. Therefore, all good faith efforts to locate and utilize Section 3 Business Concerns must be made, and documented, prior to the submittal of the bid. All documentation of the bidder’s good faith effort must be submitted upon request of the City. Examples of documentation include, but are not limited to, publications, fax confirmations, certified mail receipts, etc. Notes and messages from the bidder will not be considered good faith effort documentation.

Hiring of Section 3 residents is an effort that will have to be made by the successful bidder; however, this effort can be made after award. No good faith effort documentation for the hiring of Section 3 residents will be required with the submittal of the bid.

It will be the responsibility of the City’s Project Manager to make a fair and reasonable judgment whether a bidder that did not meet the goal, made adequate good faith efforts. Consideration will be given to the quality, quantity and intensity of the different kinds of efforts that the bidder has made. The efforts employed by the bidder should be those that one could reasonably expect a bidder to take if the bidder were actively and aggressively try to obtain Section 3 participation sufficient to meet the Section 3 hiring goal.

Additionally, all bidders will be required to submit with their bids all Section 3 documentation included in this bid packet between pages 37 to 41, inclusive. This documentation includes the Section 3 Affirmative Action Plan, Section 3 Assurance, Section 3 Estimated Project Work Force Breakdown, Section 3 Proposed Contracts/Subcontracts Breakdown and Bidder Section 3 Commitment for Construction Contracts.

5.a
Packet Pg. 195 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 52 STATE INCOME LIMITS FOR 2023
FY
2023
Incom
e Limit
Area
Income
Category
1 Person 2 Person 3 Person 4 Person 5 Person 6 Person 7 Person 8 Person Imperial
County
Extremel
y Low
(30%)
Income
($)
$17,350 $19,800 $24,860 $30,000 $35,140 $40,280 $45,420 $50,560 Very
Low
(50%)
Income
($)
$28,900 $33,000 $37,150 $41,250 $44,550 $47,850 $51,150 $54,450 Low
(80%)
Income
($)
$46,200 $52,800 $59,400 $65,950 $71,250 $76,550 $81,800 $87,100 2023 INCOME LIMITS ----------------------------------------- El Centro, CA MSA contains Imperial County, CA

5.a
Packet Pg. 196 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 53 SECTION 3 AFFIRMATIVE ACTION PLAN
(TO BE COMPLETED AND SUBMITTED WITH BID)
In accordance with the Housing and Urban Development Act of 1968, as amended, and the regulations pursuant to that Act.
_______________________________________
(Contractor)
Agrees to comply with Section 3 of that Act by assuring that to the greatest extent feasible:

1. Training and employment opportunities will be given to lower income residents of the project; and

2. Contracts in connection with the project will be awarded to business concerns which are located in or owned in substantial part by persons residing in the area of the project.
____________________________ will initiate the following actions to insure utilization of lower income project residents as employees or trainees and to incorporate project area small businesses as subcontractors and suppliers.

3. The Contractor will establish and maintain a directory of service organization, job referral agencies and manpower training programs operating within, or servicing, project area residents.

4. The Contractor will submit, prior to the award of a contract, a signed assurance that it will comply with Section 3 regulations and requirements.

5. The Contractor will provide, prior to the signing of a contract, a statement of work force needs, including trainee positions.

6. The Contractor will notify community-based organizations of available employment opportunities, and shall maintain records of response from such organizations.

7. The Contractor will make continuing personal recruitment efforts directed to such service organizations and to schools with lower income resident training programs with which he is familiar.

8. The Contractor will maintain a file of the names and addresses of each low-income resident worker referred to him and that action was taken with respect to each such referred worker and, if the worker was not employed, the reasons therefore (attached).

5.a
Packet Pg. 197 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 54 9. The Contractor will include the Section 3 clause in every subcontract for work in connection with HUD-assisted projects (attached)

10. For each subcontract, the Contractor will submit, prior to contract award, the Section 3 Affirmative Action Plans of its subcontractors.

11. The Contractor will not attempt to circumvent Section 3 provisions.

12. The Contractor will, to the greatest extent feasible, attempt to employ or fill training positions with lower income project area residents; it will, as a minimum, provide evidence of the following:
a. Attempts to recruit from the project area through local advertising media, community organizations and public and private agencies operating within or serving the project area, such as the State Employment Department and the Private Industry Council.
b. Maintain a list of all lower income area residents who have applied either on their own or on referral from any source, and that he has employed such persons if otherwise qualified and if an opening exists.

13. The Contractor will, to the greatest extent feasible, attempt to incorporate project area businesses as subcontractors and suppliers.

14. The Contractor will provide the Section 3 workforce and business utilization reports required under this Contract.
_______________________________ fully realizes failure or refusal to comply and give satisfactory assurances of future compliance with the requirements of this Affirmative Action Plan shall be proper basis for any and all of the following actions: cancellation, termination or suspension in whole or in part of the contract; a determination of ineligibility or debarment from any further contracts under any Federal program with respect to which the failure or future occurred until satisfactory assurances of future compliance have been received.

Authorized Signature _______________________ Date:_______________

5.a
Packet Pg. 198 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 55 SECTION 3 ASSURANCE
[FORM MUST BE COMPLETED AND SUBMITTED WITH BID]

1. We, the undersigned
(representative), as official representative of
(contractor) agree to comply with Section 3 requirements for the Mc Gee Park Playground Improvement Project. It is understood that failure to comply may result in the following sanctions: cancellations, termination or suspension in whole or in part of this Contract.

2. Staffing
A. How many positions will be needed on this project?
Occupational Categories: (Provide detail in Attachment 1) B. How many of these positions will be filled by your regular, permanent employees?
C. How many positions are project to be filled by low income area residents? Occupational Categories: (Provide detail in Attachment 1) D. How many subcontractors will be utilized for this project? E. Of these subcontractors, how many are Section 3 subcontractors? F. How many businesses/suppliers will be utilized?
G. Of these, how many are Section 3 businesses?

3. Complete Attachment 2.

Authorized Signature _____________ Date:

5.a
Packet Pg. 199 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 56 SECTION 3 ESTIMATED PROJECT WORK FORCE BREAKDOWN (Attachment 1) Job Category
Total Estimated
Positions Needed
for Project
No. Positions
Occupied by
Permanent
Employees
Number of
Positions not
Occupied
Number of
Positions to be
filled with Section
3 residents
Supervisor
Professional
Technical
Office / Clerical
Others
TRADE:

Journeyman
Apprentices
Trainees
Others
TRADE:

Journeyman
Apprentices
Trainees
Others
Section 3 Resident:

Individuals residing with the Section 3 Area
whose family income does not exceed eighty
percent (80%) of the median income in the
Metropolitan Statistical Area or the county if
not within a MSA in which the Section 3-
covered project is located.

NOTE: This document must be completed
and submitted with bid documents.

Date: ____________________________
________________________________
Company
________________________________
Project
________________________________
Project Number
________________________________
Person Completing Form

5.a
Packet Pg. 200 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 57 SECTION 3 PROPOSED CONTRACTS/SUBCONTRACTS BREAKDOWN (Attachment 2) Type of Contract
(Business or
Profession)
Total
Number
Total Approx. Dollar
Amount
Estimated No. of
Contracts to
Section 3
Businesses
Estimated Dollar
Amount to
NOTE:

This document is to be completed
and submitted by the contractor with
bid documents.
____________________________
Date
__________________________________
Company
__________________________________
Project
__________________________________
Project Number
__________________________________
Person Completing Form

5.a
Packet Pg. 201 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 58 BIDDER SECTION 3 COMMITMENT FOR CONSTRUCTION CONTRACTS (MUST BE SUBMITTED WITH BID)
The Bidder shall list below the name and the location of the place of business of each Section 3 subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a Section 3 subcontractor licensed by the State who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications.

ALL SECTION 3 BUSINESSES THAT THE PRIME CONTRACTOR INTENDS TO UTILIZE TO FULFILL THE SECTION 3 REQUIREMENT, MUST BE LISTED BELOW REGARDLESS OF DOLLAR VALUE OF WORK.

Failure to comply with this requirement will render the Bid non-responsive and may cause its rejection.

PORTION OF WORK DOLLAR VALUE

OF WORK

NAME, ADDRESS, AND

PHONE NUMBER OF
SECTION 3 BUSINESS

AGENCY HOLDING

COMPANY
CERTIFICATION*
*If company meets the qualifications of a Section 3 business, but has not yet been certified, they must contact the City of El Centro to arrange for certification PRIOR to bid opening.

5.a
Packet Pg. 202 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 59 FEMALE AND MINORITY GOALS AND TIMETABLES
The following goals and timetables for female utilization shall be included in all Federal and Federallyassisted construction contracts and subcontracts in excess of ten thousand dollars ($10,000). The goals are applicable to the Contractor’s aggregate on-site construction workforce whether or not part of that workforce is performing work on a Federal or Federally-assisted construction contract or subcontract.

AREA COVERED
(Goals for females apply nationwide)
Timetable Goal
From April 1, 1981, until further notice 6.9%
Until further notice, the following goals for minority utilization in each construction craft and trade shall be included in all Federal or Federally-assisted construction contracts and subcontracts in excess of ten thousand dollars ($10,000) to be performed in the respective geographical areas. The goals are applicable to each nonexempt contractor’s total on-site construction workforce, regardless of whether or not part of that workforce is performing work on a Federal, Federally-assisted or non-Federally related project, contract or subcontract.

Construction contractors participating in an approved Hometown Plan (see 41 CFR 60-4.5) are required to comply with the goals of the Hometown Plan with regard to construction work they perform in the area covered by the Hometown Plan. With regard to all their other covered construction work, such contractors are required to comply with the applicable SMSA or EA goal contained in this appendix.

ECONOMIC AREAS
Area Covered Goal Percent
San Diego Economic Area
Imperial County 18.2%
Riverside County 19.0%
San Diego County 16.9%

5.a
Packet Pg. 203 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 60 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity (Executive Order 11246).
(TO BE COMPLETED AND SUBMITTED WITH BID)

1. The offeror or bidder’s attention is called to the “Equal Opportunity Clause” and the “Standard Federal Equal Employment Opportunity Construction Contract Specifications” set forth herein.

2. The goals and timetables for minority and female participation, expressed in percentage terms for the contractor’s aggregate workforce in each trade on all construction work in the covered areas are as follows:

GOALS FOR MINORITY GOALS FOR FEMALE

PARTICIPATION IN PARTICIPATION IN

TIMETABLES EACH TRADE EACH TRADE
These goals are applicable to all the Contractor’s construction work (whether or not it is Federal or Federally-assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its Federally involved and non-Federally involved construction.

The Contractor’s compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a), and its efforts to meet the goals established for the geographical area where the contract resulting from this solicitation is to be performed. The hours of minority and female employment and training must be substantially uniform through the length of the contract, and in each trade, and the contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from contractor to contractor or from project to project for the sole purpose of meeting the Contractor’s goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed.

3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs, U.S. Department of Labor, within ten (10) working days of award of any construction subcontract in excess of ten thousand dollars ($10,000) at any tier for construction work under the Contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the contract is to be performed.

4. As used in this notice, and in the contract resulting from this solicitation, the “covered area” is the area between Pico Avenue and Villa Way and Waterman and Imperial Avenues located in the City of El Centro, County of Imperial, State of California

5.a
Packet Pg. 204 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 61 MINORITY/WOMEN’S BUSINESS ENTERPRISE CONSTRUCTION PROJECTS (TO BE COMPLETED AND SUBMITTED WITH BID)
(a) It is the policy of the City of El Centro to take positive steps to maximize the utilization of minority and women’s business enterprises in all contract activity administered by the City of El Centro.
(b) The Contractor will utilize his best efforts to carry out this policy in the award of his subcontracts to the fullest extent consistent with the efficient performance of this Contract. As used in this Contract, the term “minority or women’s business enterprise” means a business, at least fifty percent (50%) of which is owned by minority group members or women or, in the case of publicly-owned businesses, at least fifty-one percent (51%) of the stock is owned by minority group members or women. For the purpose of this definition, minority group members are Black, Hispanics, Asians, Native Americans, Alaskans or Pacific Islanders. (c) The Contractor will submit the following statement as part of his sealed bid:

I have taken affirmative action to seek out and consider minority and women’s business enterprises for the portions of work to be subcontracted. Such actions are fully documented in my records and available upon request. Results are as follows:

Name & Address of Minority Women’s Firms
Contractor Anticipates Utilizing*
Category of Work Dollar Value of
Participation
Total Bid__________________ Total Subcontract Amount______________ Minority/Women’s Enterprise Total of Subcontract Amount________________ * Indicate whether business is owned by a minority or a woman.

5.a
Packet Pg. 205 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 62 CONTRACTOR’S/SUBCONTRACTOR’S CERTIFICATION

CONCERNING STATE LABOR STANDARDS AND PREVAILING WAGES
(TO BE COMPLETED AND SUBMITTED WITH BID)
All contractors and subcontractors shall give the following certification to the City of El Centro and forward this certification to the City of El Centro within ten (10) days after the execution of any contract or subcontract.

A. “I am aware of the provisions of sections 1720 et seq. of the California Labor Code which requires that the State prevailing wage rate shall be paid to employees where this rate exceeds the Federal wage rate.” B. “I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this contract.” C. “It is further agreed that, except as may be provided in section 1815 of the California Labor Code, the maximum hours a worker is to be employed is limited to eight (8) hours per day and forty (40) hours per week and the subcontractor shall forfeit, as a penalty, twenty-five dollars ($25) for each worker employed in the execution of the subcontract for each calendar day during which a worker is required or permitted to labor more than eight (8) hours in any calendar day or more than forty (40) hours in any calendar week.”
(Contractor/Subcontractor)
By ___________________________
(Signature)
(Typed Name and Title) (Date)

5.a
Packet Pg. 206 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 63 GENERAL CONDITIONS
1-01 DEFINITIONS.
a) The word “City” shall mean the City of El Centro, California. b) The term “City Council” shall mean the City Council of the City of El Centro. c) The word “Contractor” shall mean the party of the second part entering into the contract with the City for the performance of work required by these specifications, and legal representatives of said party, or agent appointed to act for said party in the performance of the work. Said party is referred to throughout the contract documents as if of the singular number and the masculine gender.
d) The term “Day” shall mean calendar days unless otherwise provided. e) The term “Director of Community Services” shall mean the City of El Centro Community Services Director, or designee. acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties entrusted to them. f) The word GREENBOOK shall mean the Standard Specifications for Public Works Construction contained in the latest Edition, as written and promulgated by the Joint Cooperative Committee of the Southern California Chapter of the American Public Works Association and the Southern California District of the Associated General Contractors of California. Copies of these Standard Specifications are available from the publisher, Building News, Incorporated, 990 Park Center Drive, Suite E, Vista, CA 92081 (760) 734- 1113.
1-02 CONTRACT DOCUMENTS
The Notice of Inviting Bids, the Instructions to Bidders, the Proposal, the Specifications, and the Drawings, together with the Agreement and all documents referenced there, constitute the Contract. These Contract documents are complimentary, and what is called for in any one (1) shall be as binding as if called for in all. The intention of the documents is to require a complete and finished piece of work. The Contractor at its sole cost and expense shall perform all labor and services and shall furnish all materials, tools, equipment, and facilities necessary for the proper execution of the work, with the exception of such items as are definitely set forth in the specifications or the drawings to be furnished by the City. Anything shown in the drawings and not in the specifications or in the specifications and not in the drawings shall be performed by the Contractor as though shown in both the drawings and the specifications. 1-03 AUTHORITY OF THE COMMUNITY SERVICES DIRECTOR
The Community Services Director shall give all orders and directions contemplated under the contract; shall determine the adequacy of the Contractor’s methods, plans, and appurtenances; shall determine in all cases the amount, quality, acceptability, and fitness of the several kinds of work and materials which are to be paid for; shall determine all questions in relation to said work and the construction thereof; and shall decide in all cases every question, which may arise relative to the fulfillment of this contract on the part of the Contractor. Should any discrepancy appear or any misunderstandings arise as to the import of anything contained in the specifications or drawings, the matter shall be referred to the Community Services Director, who shall decide the same in accordance with the true intent and meaning as construed by that Director, and that decision shall be binding on the Contractor. Any differences or conflicts which may arise between

5.a
Packet Pg. 207 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 64 the Contractor and other contractors of the City in regard to their work shall be adjusted and determined by the Community Services Director.
1-04 ACCESS TO WORK
The Community Services Director, their assistants, inspectors, agents, and other employees shall at all times and for any purposes have access to the work and the premises used by the Contractor, and the Contractor shall provide safe and proper facilities therefor. 1-05 LINES AND GRADES
All distances and measurements are given and will be made in horizontal plane. Grades are given from the top stakes, or nails, unless otherwise noted on the plans.

Three consecutive points shown in the same rate of slope must be used in common, in order to detect any variation from a straight grade, and in case any such discrepancy exists, it must be reported to the Community Services Director. If such a discrepancy is not reported to the Community Services Director, the Contractor shall be responsible for any error in the finished work.

Services Assistance Notice: The Contractor shall give at least twenty-four (24) hours’ notice in writing when he will require the services of the Community Services Director for laying out any portion of the work. The Contractor shall furnish the Community Services Director such facilities and labor necessary for marking and maintaining points and lines as he may require. Labor furnished by the Contractor for such purposes will be paid for as extra work.

The Contractor will preserve all stakes and points set for lines, grades or measurements of the work in their proper places until authorized to remove them by the Community Services Director.

All expenses incurred in replacing stakes that have been removed without proper authority shall be paid by the Contractor.
1-06 LEGAL ADDRESS OF CONTRACTOR
The address given in the Contractor’s proposal on which the contract is founded is hereby designated as the place to which all notices, letters, and other communications to the Contractor shall be mailed or delivered. The mailing to or delivering at the above-named place of any notice, letters, or other communication to the Contractor shall be deemed sufficient service thereof upon the Contractor. The date of said service shall be the date of such mailing or delivery. Such address may be changed at any time by a written notice signed by the Contractor and delivered to the Community Services Director.
1-07 CONTRACTOR'S RESPONSIBILITIES
(a) The Contractor shall be responsible for safe, efficient, and adequate methods and equipment during the progress of the work so as to secure the safety of the workers, the quality of work required and the required rate of progress. (b) The Contractor shall bear all losses resulting to it on account of the amount of character of the work, or from any unforeseen obstructions or difficulties, which may be encountered, on account of the weather, floods, or other causes.

5.a
Packet Pg. 208 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 65 (c) The Contractor shall assume the defense of and indemnify and save harmless the City and its officers and agents from all claims of any kind arising from his own negligence or that of its agents in the performance of the contract.
(d) The Contractor shall be responsible for any materials furnished him and for the care of all work until its completion and final acceptance, and shall at its own expense replace damaged or lost material and repair damaged parts of the work, or the same may be done at its expense by the City.
(e) During the progress of the work the Contractor shall keep the premises occupied by it in a neat and clean condition, and free from any unsightly accumulation of rubbish, unused material, concrete forms, and other equipment and materials belonging to him or used under its direction during construction, and in the event of its failure to do so, the same may be removed by the City at the expense of the Contractor. (f) Traffic Control. The Contractor shall be responsible for maintaining traffic control at all times under the guidelines of the California Manual on Uniform Traffic Control Devices (“California MUTCD”). Contractor shall submit two (2) traffic control plans in a minimum of two (2) business weeks for pre-approval by the Director of Public Works before starting construction work.
1-08 CONTRACTOR TO FURNISH INFORMATION
(a) Before proceeding with the erection of the construction plant, and other temporary structures, the Contractor shall furnish the Community Services Director with information and drawings of all such structures as may be required. (b) Drawings and prints in such detail as may be required, or articles, machinery, or fabricated materials entering into permanent construction which are by these specifications required to be furnished by the Contractor and of which detailed drawings are not furnished by the City shall be submitted by the Contractor for approval and shall become the property of the City. Such approval shall not, however, operate to waive or modify any provision or requirement contained in these specifications.
1-09 EXAMINATION OF WORK
Bidders must examine the location, physical conditions and surrounding of the proposed work and judge for themselves the nature of the excavations to be made and the work to be done.

The Contract documents for the work show conditions as they are supposed or believed by the Engineer to exist, but it is not intended or to be inferred that the conditions as shown therein constitute a representation or warranty, express or implied, by the City or any of it officers or employees, that such conditions are actually existent, nor shall the Contractor be relieved of the liability under his contract, nor shall the City or any of its officers or employees be liable for any loss sustained by the Contractor as a result of any variance between conditions shown in the Contract Documents and the actual conditions revealed during the progress of the work or otherwise.
1-10 PLANS AND DRAWINGS
All authorized alterations affecting the requirements and information given on the approved plans shall be in writing. No changes shall be made of any plan or drawing after the same has been

5.a
Packet Pg. 209 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 66 approved by the Community Services Director, accept by direction of the Community Services Director.

Deviations from the approved plans, as may be required by the exigencies of construction, will be determined in all cases by the Community Services Director and authorized in writing.

Working drawings or plans for any structure not included in the plans furnished by the Community Services Director shall be approved by the Community Services Director before any work involving these plans shall be performed, unless approval is waived in writing by the Community Services Director.

It is mutually agreed, however, that approval by the Community Services Director of the Contractor’s working plans does not relieve the Contractor of any responsibility for accuracy of dimensions and details, and that the Contractor shall conform to the approved plans and specifications.
1-11 PERSONAL ATTENTION
The Contractor shall give his personal attention constantly to the faithful prosecution of the work, and shall be present, either in person or by a duly authorized and competent representative, on the site of the work, continually during its progress, to receive directions or instructions from the Community Services Director. Whenever the Contractor is not present on any part of the work where it may be desired to give directions, orders may be given by the Community Services Director, and shall be received and obeyed by the superintendent or foreman who may have charge of the particular part of the work in reference to which orders are given. 1-12 PROTESTS
All protests and disputes after award of the contract are subject to the provisions of Public Contract Code Section 9204 as attached and incorporated. 1-13 RIGHT-OF-WAY
The right-of-way for the work to be constructed will be provided by the City. The Contractor shall make his own arrangements and pay all expenses for additional area required by him outside of the limits of the right-of-way, unless otherwise provided in the special conditions. 1-14 TIME AND ORDER OF WORK
(a) The Contractor shall at all times employ such force, plant, materials and tools as will be sufficient, in the opinion of the Community Services Director, to complete the work or any separable portions thereof in accordance with a progress schedule and within the time limit fixed by the contract. If the Contractor should fail to employ sufficient force, plant, materials and tools or to maintain adequate progress he may, after such failure, be required to increase its progress at any point or points or to modify his plans and procedures in such manners and to such extent as the Community Services Director may direct, any extension of such shall not relieve the Contractor from the necessity of maintaining the required progress. In case of an extension by the Community Services Director of the time for the completion of the contract, as hereinafter provided a revised schedule of progress may be prescribed in accordance with such extension of time. (b) The time in which the various portions and the whole of the contract are to be performed and the work is to be completed is of the essence of the contract.

5.a
Packet Pg. 210 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 67 1-15 ASSIGNMENT FORBIDDEN
The Contractor shall not assign, transfer, convey, or otherwise dispose of this contract, or of his right, title or interest in or to the same or any part thereof, without the previous consent in writing of the Community Services Director and he shall not assign, by power of attorney or otherwise, any of the monies to become due and payable under the contract unless by and with the like consent signified in like manner. If the Contractor shall, without such previous written consent, assign, transfer, convey or otherwise dispose of the contract or of his right, title or interest therein, or of any of the monies to become due under the contract, to any other person, company or other corporation, the contract may at the option of the City be terminated and revoked, and the City shall thereupon be relieved and discharged from any and all liability and obligations growing out of the same to the Contractor, and to his assignee or transferee.

No right under the contract, nor any right to any money to become due hereunder, shall be asserted against the City in law or equity by reason of any so-called assignment of the contract, or any part thereof, or by reason of the assignment of any monies to become due hereunder, unless authorized as aforesaid by the written consent of the Community Services Director. 1-16 SUBLETTING
The Contractor shall give his personal attention of the fulfillment of the contract and shall keep the work under his control. Subcontractors will not be recognized as such, and all persons engaged in the work of construction will be considered as employees of the Contractor, and their work shall be subject to the provisions of the contract and specifications. Where a portion of the work sublet by the Contractor is not being prosecuted in a manner satisfactory to the Community Services Director, the subcontractor shall be removed immediately on the recommendation of the Community Services Director and shall not again be employed on the work. 1-17 SUSPENSION OF CONTRACT
(a) If the work to be done under the contract shall be abandoned by the Contractor, or if the Contractor shall make a general assignment for the benefit of his creditors or be adjudicated a bankrupt, or if a receiver of his property or business is appointed by a court of competent jurisdiction, or if this contract shall be assigned by him otherwise than hereinbefore specified, or if at any time the Community Services Director shall be of the opinion that the performance of the contract is unnecessarily or unreasonably delayed, or that the Contractor is willfully violating any of the conditions or covenants of the contract, or of the specifications, or is executing the same in bad faith or not in the time named in the contract for its completion, or within the time to which the completion of the contract may have been extended as hereinbefore provided, the Community Services Director, acting on behalf of the City, may, by written notice, instruct the Contractor to discontinue all work or any part thereof under this contract.
(b) When such written notice is served upon the Contractor as provided in section 1-06, he shall immediately discontinue the work or such part thereof as is covered by the notice and shall not resume the same except by written instructions from the Director of Public Works. In any such case, the City may take charge of the work and complete it by a new contract or by force account. In so doing, the City may take possession of and use any of the materials, plant, tools, equipment, supplies and property of every kind provided by the Contractor for the purposes of his work. The City may procure other materials and provide labor for the completion of same, or contract therefore and charge the expense of completion by either method to the Contractor. These charges shall be deducted from

5.a
Packet Pg. 211 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 68 such monies as may be due or may at any time hereafter become due the Contractor under and by virtue of this contract or any part thereof. In case such expense shall exceed the amount which would have been due the Contractor under the contract if the same had been completed by him, he shall pay the amount of such excess to the City; and in case such expense shall be less than the amount which would have been payable under this contract if the same had been completed by the Contractor, he shall have no claim to the difference except to such extent as may be necessary, in the opinion of the Community Services Director, to reimburse the Contractor or the Contractor's sureties for any expense, properly incurred for plant, equipment, materials, supplies and labor devoted to the prosecution of the work of which the City shall have received the benefit and which shall not have been otherwise paid for by the City. In computing such expense so far as it shall be deducted from the depreciated value thereof at the time taken over by the City and the difference shall be considered as an expense. Evidence of such expense satisfactory to the Community Services Director, shall be required, and all necessary estimates and appraisements shall be made by him.

When any particular part of the work is being carried on for the City by contract or otherwise, under the provisions of this section, the Contractor shall continue the remainder of the work in conformity with the terms of his contract, and in such manner as in nowise to hinder or interfere with the persons or workers employed, as above provided, by the City, by contract or otherwise to do any part of the work or to complete the same under the provisions of this section.
1-18 SUSPENSION OF WORK – EXTENSION OF TIME - NO EXTRA COMPENSATION (a) The Community Services Director shall have the authority to suspend the work wholly or in part, for such period as he may deem necessary, due to unsuitable weather, or to such other conditions as are considered unfavorable for the suitable prosecution of the work or for such time as he may deem necessary due to the failure on the part of the Contractor to carry out orders given or to perform any provisions of the work. The Contractor shall immediately obey such order of the Community Services Director. (b) Applications for extension of time must be made promptly in writing, stating cause. No delay shall be made the basis in any application for extension of time, unless such delay and the cause thereof shall have been called to the attention of the Community Services Director in writing within the ten (10) days from the beginning of such delay. Applications for extension of time shall be addressed to the Community Services Director. (c) Permitting the Contractor to continue and finish the work, or any part of it, after the date to which the time fixed for its completion may have been extended, shall in nowise operate as a waiver on the part of the City or any of its rights under this contract. (d) The Contractor shall receive no compensation on account of any suspension of the work either in whole or in part or for any delay or hindrance herein mentioned except as provided in the Detail Specifications or as otherwise required by law.. 1-19 FAILURE TO COMPLETE ON TIME AND LIQUIDATED DAMAGES (a) The Contractor shall pay for each and every day, including Sundays and legal holidays that they shall be in default in completing the whole work to be done under this contract, the sum named in the Special Provisions, which sum is by the execution of the Agreement mutually agreed upon as liquidated damages which the City will suffer by reason of such

5.a
Packet Pg. 212 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 69 default. The City shall have the right to deduct the amount of such damages from any monies due or to become due the Contractor under this contract. (b) It is further agreed that in case the work called for under the contract is not finished and completed in all parts and requirements within the time specified, the City Council shall have the right to extend the time for completion or not, as may seem best to serve the interest of the City; and if it decides to extend the time limit for the completion of the contract, it shall further have the right to charge to the Contractor, his heirs, assigns or sureties and to deduct from the final payment for the work, all or any part, as it may deem proper of the actual cost of engineering, inspection, superintendence and other overhead expenses which are directly chargeable to the contract and which accrue during the period of such extension, except that the cost of final surveys and preparation of final estimate shall not be included in such charges.
(c) The Contractor shall not be assessed with liquidated damages nor the cost of engineering and inspection during any delay in the completion of the work caused by the acts of God or of the public enemy, acts of the City, fire, floods, epidemics, quarantine restrictions, strikes, freight embargoes and unusually severe weather or delays of subcontractors due to such causes; provided, that the Contractor shall within ten (10) days from the beginning of any such delay notify the Community Services Director in writing of the causes of delay, who shall ascertain the facts and the extent of delay, and his findings of the facts thereon shall be final and conclusive.
1-20 CHANGES
(a) If either the Community Services Director or the Contractor on account of conditions which develop during the progress of the work finds it impracticable to comply strictly with these specifications, the Community Services Director may prescribe a modification of requirements of methods of work. For such purposes, the Community Services Director may at any time during the life of the contract, by written order make such changes as he shall find necessary in the design, line, grade, form, location, dimensions, plan or material of any part of the work or equipment hereinafter specified, or in the quantity or character of the work or equipment to be furnished. If such changes increase or diminish the quantity or amount of work to be done, they shall not constitute the basis for a claim for damages or anticipated profits on the work that may be dispensed with; provided, that if such changes or alterations render useless, any work already done or materials already furnished or used in the work, the Community Services Director shall make reasonable allowance therefore, which action shall be binding upon both parties. (b) In the event of increasing or decreasing of work, the total amount of work actually done or materials or equipment furnished shall be paid for according to the unit price established for such work under the contract, wherever such unit price has been established. In the event no prices are named in the contract to cover such changes or alteration, the cost of such changes shall be covered as hereinafter provided for extra work.
(c) The City reserves the right to increase or decrease the quantity of any item or portion of work or to omit portions of the work as may be deemed necessary or expedient by the Community Services Director.

5.a
Packet Pg. 213 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 70 1-21 EXTRA WORK
(a) If during the performance of the contract, it shall, in the opinion of the Community Services Director, become necessary or desirable for proper completion of the contract to order work done or materials or equipment furnished which in the opinion of the Community Services Director are not susceptible of classification under the bid items, the Contractor shall do and perform such work and furnish such materials and equipment as extra work, as hereinafter provided. All extra work shall be ordered in writing before it is started. No extra work shall be paid for unless ordered in writing. (b) Extra work will ordinarily be paid for at a lump sum or unit price agreed upon in writing by the Community Services Director and the Contractor before the extra work shall be ordered.
(c) Whenever in the judgment of the Community Services Director extra work or extra material, as the case may be, is not of like character to and is not susceptible of classification under the bid items of the contract as specified, and it is impracticable because of the nature of the work, or for any other reason to fix the price before the extra work order shall be issued, extra work and material, when furnished by the Contractor, shall be paid for at actual necessary cost of materials, supplies, labor (including foremen’s wages), Workers’ Compensation insurance, contributions made to the State as required by the provisions of the Unemployment Insurance Act, Chapter 352, Statutes of 1935, as amended, taxes paid to the Federal government as required by The Social Security Act, approved August 14, 1935, as amended and the reasonable value of the use of equipment for the actual time it is used, all as determined by the Director of Public Works, plus fifteen percent (15%) to cover the following:

Profit
General Expenses
All insurance except Workers’ Compensation insurance
Excise taxes
Property taxes
Bond premiums
License and inspection fees imposed by any governmental authority Any and all other items of expense not specifically mentioned under this subsection (c) herein
The Community Services Director determination and certification of said actual necessary cost shall be binding and conclusive on the Contractor, and the Community Services Director shall be deemed the arbiter to determine the cost of such work. (d) If any work or materials be ordered under this section on a cost-plus basis, the Contractor shall, at the times directed during the performing of the work or the furnishing of the materials, render to the Community Services Director, written reports in prescribed form, showing all items that may enter into the cost, the quantity and the character of each such material, from whom purchased and the net amount paid or to be paid therefore, and such other information as directed. If required, the Contractor shall produce any books, vouchers, other records, or memoranda, which will assist the Community Services Director in determining the true, necessary cost of the work and materials to be paid for. (e) Any extra work performed hereunder shall be subject to all the provisions of the contract and the Contractor's sureties shall be bound with reference thereto as under the original contract.

5.a
Packet Pg. 214 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 71 1-22 COST BREAKDOWN
Within ten (10) days after commencing work, the Contractor shall submit, to the Community Services Director, a cost breakdown in duplicate of all unit and lump sum prices under the contract. The breakdown, as approved, may be used by the Community Services Director to verify the fair value of the work for progress payments. 1-23 PROGRESS ESTIMATES
The Community Services Director, shall on or about the fifth (5th) day of each calendar month, except as provided in section 1-23, make in writing and certify an estimate such as in her/his opinion shall be just and fair, of the amount and value of the work done by the Contractor and of the amount and value of all acceptable materials furnished and delivered by the Contractor to the site and not used up to that time in the performance of the contract. To the figure thus arrived at, shall be added any amounts due the Contractor for extra work and the amount of any approved claims for extra cost to the date of the progress estimate.

A deduction of five percent (5%) shall be made from the estimated value of the work done and fifty percent (50%) of the value of the materials so estimated to have been furnished and delivered and unused, and from the remainder there shall be further deducted any amounts due the City from the Contractor for supplies or materials furnished or services rendered and any The other amounts that may be due the City under the terms of the contract. From the balance thus determined shall be deducted the amount of all previous payments and the remainder shall constitute the progress estimate for that month.

Such progress estimates shall not be required to be made by strict measurement, but they may be made by measurement or by estimation, or partly by one method or partly by the other, and it shall be sufficient if they are approximate only.

Pursuant to Public Contract Code §22300, the Contractor has the option of substituting securities for any money that is withheld under this section.
1-24 PROGRESS ESTIMATES MAY BE WITHHELD
The progress estimates provided for in section 1-23 hereof may at any time be withheld or reduced if, in the opinion of the Community Services Director, the Contractor is not diligently and efficiently endeavoring to comply with the intent of the contract, or if the Contractor shall fail to pay his labor and material bills as they become due.
1-25 PROGRESS PAYMENTS
(a) Upon each progress estimate being made and certified in writing, the City shall, within fifteen (15) days after the date of such estimates, except as set forth in subsection (b) hereof, pay to the Contractor the amount stated in such estimates to be due the Contractor; provided, however, that the City may at all times reserve and retain from such progress payments, in addition to the retained percentage and other amounts above mentioned to be deducted in computing the progress estimated, any sum or sums which by the terms hereof, or of any law of the State of California, it is or may be authorized or required to reserve or retain; and provided further, that no progress estimate or progress payment shall constitute an acceptance of the work or any portion thereof. The

5.a
Packet Pg. 215 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 72 percentage deducted as above set forth shall become due and payable with and as a part of the final payment to be made as hereinafter provided. (b) In the event the contract or any part thereof shall be suspended as provided in section 1- 17, the retained percentage as provided in section 1-23, shall become the sole and absolute property of the City to the extent necessary to repay to the City any excess in the cost of the work above the contract price. After issuance of notice to discontinue work, no payments upon progress estimates or otherwise shall thereafter be made the Contractor for the work covered by said notice until completion of the work. 1-26 FINAL ESTIMATE AND PAYMENT
(a) Whenever in the opinion of the Community Services Director the Contractor shall have completely performed the contract on his part, the Community Services Director will submit to the Contractor a written statement of the final quantities of contract items for inclusion in the final estimate. The Contractor will be expected to submit his written approval of said proposed final quantities within five (5) days of receipt of the Community Services Director’s statement, or in the event the Contractor disagrees with such written statement, shall within said period of five (5) days file a written statement of all claims, which he intends to present.
(b) Upon receipt from the Contractor of written approval of the final quantities or such written statement of his claims, the Community Services Director shall make in writing and certify to the City Clerk an estimate in which he shall state, from actual measurements, the whole amount of work done by the Contractor and also the value of such work under and according to the terms of the contract. Within ten (10) days after the date of receipt of the aforesaid approval or state of claims, the Community Services Director shall cause to be filed, on behalf of the City, in the Office of the Imperial County Recorder, a Notice of Completion of the work herein agreed to be done by the Contractor. On the expiration of thirty-five (35) days after the filing of such notice of completion of the work, the City shall pay to the Contractor the amount remaining after deducting from the amount of value stated in the first mentioned estimate all prior payments to the Contractor and all amounts to be kept and retained under the provisions of the contract. (c) All prior estimates upon which partial payments have been made shall be subject to correction in the final estimate. The final estimate and payments made thereunder shall be final and conclusive upon the Contractor.
1-27 RECOVERY OF DAMAGES
The making of an estimate and payment in accordance therewith shall not preclude the City from demanding and recovering from the Contractor such damages as it may sustain by reason of his failure to comply with the specifications.
1-28 FINAL PAYMENT TERMINATES LIABILITY
The acceptance by the Contractor of the final payment aforesaid shall be a release to the City and its agents from all claim and liability to the Contractor for anything done or furnished for or relating to the work or for any act or neglect of the City or of any person relating to or affecting the work except the claim against the City for the remainder, if any, of the amount kept or retained as provided in section 1-31.

5.a
Packet Pg. 216 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 73 1-29 NO PERSONAL LIABILITY
No agent of the City shall be personally responsible for any liability arising under the contract. No claims shall be made or filed and neither the City nor any of its agents shall be liable for or held to pay any money, except as specifically provided in the contract. 1-30 MONIES MAY BE RETAINED
The City may keep any monies which would otherwise be payable at any time hereunder and apply the same, or so much as may be necessary therefore, to the payment of any expense, losses or damages as determined by the Community Services Director incurred by the City for which the Contractor is liable under the contract.
1-31 UNPAID CLAIMS
If, upon or before the completion of the work herein agreed to be performed or at any time prior to the expiration of the period within such claims of liens may be filed for the record as prescribed by Civil Code §§ 9350 et seq,, any person or persons claiming to have performed any labor or furnished any material, supplies or services toward the performance or completion of this contract, or that they have agreed to do so, shall file with the City a verified statement of such claim, stating in general terms the kind of labor and materials and the name of the person to or for whom the same was done or furnished, or both, together with a statement that the same has not been paid or if any person or persons shall bring against the City or against any agent or agents thereof any action to enforce such claim, the City shall until the discharges thereof withhold from the monies under its control so much of said monies due or to become due the Contractor under this contract as shall be sufficient to satisfy and discharge the amount in such notice or under such action claimed to be due, together with the costs thereof; provided that if the City shall in its discretion permit the Contractor to file such additional bonds as is authorized by Civil Code §9364, in a penal sum equal to one hundred twenty-five percent (125%) times the amount of said claim, said monies shall not thereafter be withheld on account of such claim. 1-32 ADDITIONAL SURETY
If during the continuance of the contract, any of the sureties upon the faithful performance bond in the opinion of the Community Services Director are/or become insufficient, he may require additional sufficient sureties which the Contractor shall furnish, to the satisfaction of the Community Services Director, within fifteen (15) days after notice and in default thereof the contract may be suspended and the work completed as provided in section 1-17 hereof. 1-33 PREVAILING RATE OF PER DIEM WAGES
The City has ascertained the general prevailing rate of per diem wages in the locality in which the work is to be performed for each craft or type of worker or mechanic needed to execute the contract and has specified same in the Notice of Inviting Bids which is attached hereto and made a part of the contract. The Contractor shall forfeit as a penalty to the City of not more than fifty dollars ($50) for each laborer, worker or mechanics employed for each calendar day or portion thereof, such laborer, worker or mechanic is paid less than the required rates for any work done under the contract by him or by any subcontractor under him in violation of the provisions of the California Labor Code.

5.a
Packet Pg. 217 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 74 1-34 PAYMENT OF WAGES
The issuance as payment for wages of any evidence of indebtedness is prohibited unless the same is negotiable and payable on demand without discount. Wages must be paid at least semimonthly on regular pay days established in advance, and shall include all amounts for labor or services performed by employees of every description as required under the provisions of the California Labor Code.
1-35 EIGHT (8) HOUR LAW
The Contractor shall comply with all applicable provisions of Labor Code §§1810 to 1816, inclusive, relating to working hours. The time of service of any laborer, worker or mechanic employed on the work shall be limited and restricted to eight (8) hours during any one (1) calendar day, except in cases of an extraordinary emergency caused by fire, flood or danger to life or property and the Contractor shall forfeit as a penalty to the City of twenty-five dollars ($25) for each such laborer, worker or mechanic employed in the execution of this contract by him or any subcontractor under him for each calendar day during which such laborer, worker or mechanic is required or permitted to labor more than eight (8) hours in violation of the provisions of the California Labor Code.
1-36 OVERTIME - NO EXTRA COMPENSATION
Overtime work (i.e., work in excess of eight (8) hours in any one (1) calendar day or work performed on a Sunday or other legal holiday) shall not entitle the Contractor to any compensation for any contract item in addition to that set forth in the contract for the kind of work performed even though such overtime or legal holiday work may be required under emergency conditions, and may be ordered by the Community Services Director in writing. In case of extra work ordered by the Community Services Director under the provisions of section 1-21 hereof, no additional payment will be made to the Contractor because of the payment by him of overtime or legal holiday rates for such work, unless the use of overtime or legal holiday work in connection with such extra work is specifically ordered in writing by the Community Services Director and then only to such extent as extra payment is regularly being made by the Contractor to his men for overtime or legal holiday work of a similar nature in the same locality. 1-37 CHARACTER OF WORKERS
None but skilled workers shall be employed on work requiring special qualifications. When required in writing by the Community Services Director, the Contractor or any subcontractor shall discharge any person who is in the opinion of the Community Services Director, incompetent, unfaithful, disorderly or otherwise unsatisfactory and shall not again employ such discharged person on the work except with the consent of the Community Services Director. Such discharge shall not be the basis of any claim for compensation or damage against the City or any of its officers.
1-38 SAMPLES AND TESTS
At the option of the Community Services Director, the source of supply of each of the materials shall be approved by the Community Services Director before delivery is started and before such material is used in the work. Representative preliminary samples of the character and quality prescribed shall be submitted by the Contractor or producer of all materials to be used in the work for testing or examination as desired by the Community Services Director.

5.a
Packet Pg. 218 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 75 All tests of materials furnished by the Contractor shall be made in accordance with commonly recognized standards of national organizations, and such special methods and tests are prescribed in these specifications.

The Contractor shall furnish such samples of materials as are requested by the Community Services Director, without charge. No material shall be used until it has been approved by the Community Services Director. Samples will be secured and tested whenever necessary to determine the quality of material.
1-39 INSPECTION
The Director of Public Works shall at all times have access to the work during construction, and shall be furnished with every reasonable facility for ascertaining full knowledge respecting the progress, workmanship and character of materials used and employed in the work.

Whenever the Contractor varies the period, which work is carried on each day, he shall give due notice to the Community Services Director, so that proper inspection may be provided. Any work done in the absence of the Community Services Director will be subject to rejection. The inspection of the work shall not relieve the Contractor of any of his obligations to fulfill the contract as prescribed. Defective work shall be made good and unsuitable materials may be rejected notwithstanding the fact that such defective work and unsuitable materials have been previously overlooked by the Community Services Director and accepted or estimated for payment. 1-40 DEFECTIVE WORK OR MATERIALS – WARRANTIES, GUARANTEES AND

INSTRUCTION SHEETS
(a) If the work, or any part thereof, shall be found defective at any time before the final acceptance of the whole work, the Contractor shall forthwith make good such defects without compensation in a manner satisfactory to the Community Services Director, and the cost of any excess material furnished by the City shall be borne by the Contractor. (b) All materials not conforming to the requirements of these specifications shall be considered as defective and all such material whether in place or not shall be rejected and shall be removed immediately from the site of the work unless otherwise permitted by the Community Services Director. No rejected material, the defects of which have been subsequently corrected shall be used until approved in writing by the Community Services Director.
(c) Upon failure on the part of the Contractor to comply with any order of the Community Services Director made under the provisions of this article, the Community Services Director shall have authority to remove and replace defective material and to deduct the cost of removal and replacement from any monies due or to become due the Contractor. (d) The work shall be warranted by the Contractor against defective materials and workmanship for a period of one (1) year. The warranty period shall start on the date the work was completed as determined by the Engineer.
(e) The warranty period for specific items covered under manufacturers’ or suppliers’ warranties shall commence on the date they are placed into service at the direction of or as approved by the Engineer in writing.
(f) All warranties, express or implied, from subcontractors, manufacturers or suppliers, of any tier, for the materials furnished and work performed shall be assigned, in writing, to the

5.a
Packet Pg. 219 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 76 City, and any such warranties shall be delivered to the Engineer prior to acceptance of the Contractor’s performance of the contract.
(g) The Contractor shall replace or repair defective materials and workmanship in a manner satisfactory to the Engineer, after notice to do so from the Engineer, and within the time specified in the notice. If the Contractor fails to make such replacement or repairs within the time specified in the notice, the City may perform the replacement or repairs at the Contractor’s expense. If the Contractor fails to reimburse the City for the actual costs, the Contractor’s Surety shall be liable for the cost thereof. 1-41 USE OF COMPLETED PORTIONS
The City may at any time during progress of the work, after written notice to the Contractor, take over and place in service any completed portions of the work which are ready for service, although the entire work of the contract is not fully completed and notwithstanding the time for completion of the entire work or such portions which may not be expired. In case, the City shall issue certificates of acceptance for such portions of the work but such taking possession thereof shall not be deemed an acceptance of any other portion of the work, nor of any incomplete portions, nor of any work not completed in accordance with the contract documents. 1-42 PROPERTY RIGHTS IN MATERIALS
Nothing in this contract shall be construed as vesting in the Contractor any right of property in the materials used after they have been attached or affixed to the work or the soil or after payment has been made for the value of unused material delivered to the site of the work as provided for in section 1-23 hereof. All such materials attached or affixed or unused shall become the property of the City.
1-43 TITLE TO MATERIALS FOUND ON THE WORK
The right to the use of all soil, stone, gravel, sand and all other materials and equipment developed or obtained in the excavation or other operations by the Contractor or any subcontractor or any of their employees and the right to use and/or dispose of the same are hereby expressly reserved in the City and neither the Contractor, nor any subcontractor nor any of their employees shall have any right, title or interest in or to any part thereof nor shall they, nor any of them, assert or make any claim thereto. The Contractor shall be permitted to use in the work, without charge, any such materials, which meet the requirements of these specifications. 1-44 ENFORCEMENT OF ORDER
The Contractor shall be responsible for maintaining good order at the site where work is performed under this contract and to that end shall employ such watchmen or other persons as may be required. Unauthorized persons shall be excluded from the site of the work. The Contractor shall not sell, nor shall he permit or suffer the introduction or use of intoxicating liquors or narcotics upon the works embraced in these specifications or upon any of the grounds occupied or controlled by him in connection with such works.
1-45 PATENTS AND COPYRIGHTS
The Contractor shall hold and save the City, it officers, agents and employees harmless from liability of any nature and kind including costs and expenses for or on account of any copyrighted or copyrighted composition, secret process, patented or un patented invention, article or

5.a
Packet Pg. 220 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 77 appliance manufactured, furnished or used by him in the performance of this contract, including their use by the City, unless otherwise specifically set forth in the contract. 1-46 LAWS AND REGULATIONS
(a) The Contractor shall keep himself fully informed of all Federal and State laws, County and City ordinances and regulations which in any manner affect those engaged or employed on the work or the materials used in the work or in any way affecting the conduct of the work. If any discrepancy or inconsistency should be discovered in this contract, or in the drawings or specifications herein referred to in relation to any such law, ordinance or regulation, he shall forthwith report the same in writing to the Community Services Director. He shall, at all times, observe and comply with and shall cause all his agents and employees to observe and comply with all such applicable laws, ordinances and regulations in effect or which may become effective before completion of this contract. He shall protect and indemnify the City and its officers and agents against any claim or liability arising from or based on the violation of any such law, ordinance or regulation whether by himself or by his employees.
(b) Except as otherwise explicitly provided elsewhere in these specifications, all permits and licenses necessary to the prosecution of the work shall be secured by the Contractor at his own expense, and he shall pay all taxes properly assessed against his equipment or property used or required in connection with the work.
(c) All Federal laws and regulations now imposed by competent authority and relating to any materials required to be furnished under these specifications and work required to be done hereunder shall be deemed to be and hereby are made controlling and part of these specifications.
1-47 SALES AND/OR USE TAXES
Except as may be otherwise provided herein, all sales and/or use taxes assessed by Federal, State or local authorities on materials used or furnished by the Contractor in performing the work hereunder shall be paid by the Contractor.
1-48 RESPONSIBILITY FOR DAMAGE
(a) Indemnity Agreement
In addition and complementary to any other indemnification provided for the project, and except to the extent of any gross negligence or willful misconduct of an Indemnitee (as hereinafter defined), the Contractor hereby assumes liability for and agrees to defend (at Indemnitees’ option), indemnify, protect and hold harmless the City and its project consultants, engineers, officers, agents, and employees (“Indemnitees”) from and against any and all claims, charges, damages, demands, actions, proceedings, losses, stop notices, costs, expenses (including counsel fees), judgments, civil fines and penalties, liabilities of any kind or nature whatsoever, including but not limited to acts or omissions in any way related to, the release, treatment, use, generation, transportation, storage, or disposal in, on, under, to, or from the location at which work under this Agreement is performed of any Hazardous Substances by Contractor or its officers, directors, employees, agents, and subcontractors which may be sustained or suffered by or secured against the Indemnitees arising out of or encountered in connection with this Agreement or the performance of the work including, but not limited to, death of or bodily or personal injury to persons or damage to property, including property owned by or under the care and custody of the City, and for civil fines and penalties, that may arise from or be caused, in whole or in part, by any negligent or other act or omission of the

5.a
Packet Pg. 221 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 78 Contractor, its officers, agents, employees or subcontractors including, but not limited to, liability arising from:

1. Any dangerous, hazardous, unsafe or defective condition of, in or on the premises, of any nature whatsoever, which may exist by reason of any act, omission, neglect, or any use of occupation of the premises by the Contractor, its officers, agents, employees, or subcontractors;

2. Any operation conducted upon or any use or occupation of the premises by the Contractor, its officers, agents, employees, or subcontractors under or pursuant to the provisions of this contract or otherwise;

3. Any act, omission or negligence of the Contractor, its officers, agents, employees, or subcontractors.

4. Any failure of the Contractor, its officers, agents or employees to comply with any of the terms or conditions of this contract or any applicable Federal, State, regional or municipal law, ordinance, rule or regulation; and

5. The conditions, operations, uses, occupations, acts, omissions or negligence referred to in sub-subsections (1), (2), (3), and (4), existing or conducted upon or arising from the use or occupation by the Contractor on any other premises in the care, custody and control of the City.

6. The Parties expressly agree that any payment, or Costs and Expenses City incurs or makes to, or on behalf of, an injured employee under City’s workers’ compensation or other insurance, is included as a loss or Costs and Expenses for the purpose of this Section. City shall not be responsible for any acts, errors or omissions of any person or entity except City and its officers, agents, servants, employees or contractors. The Parties expressly agree that the obligations of Contractor under this Section shall survive the expiration or early termination of the Agreement.

7. For purposes of this Agreement, “Hazardous Substances” shall mean any and all of the following:
a. any substance, product, waste or other material of any nature whatsoever which is or becomes listed, regulated, or for which liability arises for misuse, pursuant to the Comprehensive Environmental Response Compensation and Liability Act (“CERCLA”), 42 U.S.C. §9601, et seq.; the Hazardous Materials Transportation Act, 49 U.S.C. §1801, et seq.; the Resource Conservation and Recovery Act (“RCRA”), 42 U.S.C. §6901, et seq.; the Toxic Substances Control Act, 15 U.S.C.S. §2601, et seq.; the Clean Water Act, 33 U.S.C. §1251, et seq.; the Insecticide, Fungicide, Rodenticide Act, 7 U.S.C. §136, et seq.; the Superfund Amendments and Reauthorization Act, 42 U.S.C. §6901, et seq.; the Clean Air Act, 42 U.S.C. §7401, et seq.; the Safe Drinking Water Act, 42 U.S.C. §300f, et seq.; the Solid Waste Disposal Act, 42 U.S.C. §6901, et seq.; the Surface Mining Control and Reclamation Act, 30 U.S.C. §1201, et seq.; the Emergency Planning and Community Right to Know Act, 42 U.S.C. §11001, et seq.; the Occupational Safety and Health Act, 29 U.S.C. §§655 and 657; the Hazardous Waste Control Act, California Health and Safety Code (“H.&S.C.”) §25100, et seq.; the Hazardous Substance Account Act, H.&S.C.§25330, et seq.; the California Safe Drinking Water and Toxic Enforcement Act, H.&S.C. §25249.5, et seq.; the Underground Storage of Hazardous Substances, H.&S.C.

5.a
Packet Pg. 222 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 79 §25280, et seq.; the Carpenter-Presley-Tanner Hazardous Substance Account Act, H.&S.C. §25300, et seq.; the Hazardous Waste Management Act, H.&S.C. §25170.1, et seq.; the Hazardous Materials Response Plans and Inventory, H.&S.C. §25001, et seq.; the Porter-Cologne Water Quality Control Act, Water Code §13000, et seq., all as they may from time to time be amended; and
b. any substance, product, waste or other material of any nature whatsoever which is or becomes listed, regulated, or for which liability for misuse arises pursuant to any other federal, state or local statute, law, ordinance, resolution, code, rule, regulation, order or decree due to its hazardous, toxic or dangerous nature.

The Contractor shall indemnify the City and pay for all damage or loss suffered by the City including but not limited to damage to or loss of the City’s property, to the extent not insured by the City and loss of the City’s revenue from any source, caused by or arising out of the conditions, operations, uses, occupations, acts, omissions or negligence referred to in sub-subsections (1), (2), (3), (4), and (5).

The Contractor’s obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of the City under any provision of this Agreement, the Contractor shall not be required to indemnify and hold harmless the City for liability attributable to the active negligence of the City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where the City is shown to have been actively negligent and where the City’s active negligence accounts for only a percentage of the liability involved, the obligation of the Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of the City.

The Contractor agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this section from each and every subcontractor or any other person or entity involved by, for, with or on behalf of the Contractor in the performance of this Agreement. In the event the Contractor fails to obtain such indemnity obligations from others as required here, the Contractor agrees to be fully responsible according to the terms of this section.

Failure of the City to monitor compliance with these requirements imposes no additional obligations on the City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend the City as set forth here is binding on the successors, assigns or heirs of the Contractor and shall survive the termination of this Agreement or this section.

This Indemnity shall survive termination of the Agreement of Final Payment hereunder. This Indemnity is in addition to any other rights or remedies that the Indemnitees may have under the law or under any other contract documents or agreements. In the event of any claim or demand made against any party which is entitled to be indemnified hereunder, the City may, in its sole discretion, reserve, retain or apply any monies to the Contractor under this Agreement for the purpose of resolving such claims; provided, however, the City may release such funds if the Contractor provides the City with reasonable assurance of protection of the Indemnitees’ interests. The City shall, in its sole discretion, determine whether such assurances or reasonable. (b) Insurance Requirements are set out in the Construction Agreement.

5.a
Packet Pg. 223 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 80 1. The Contractor agrees to ensure that subcontractors, and any other party involved with the project that is brought onto or involved in the project by the Contractor, provide the same minimum insurance coverage required of the Contractor. The Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. The Contractor agrees that upon request, all agreements with subcontractors and others engaged in the project will be submitted to the City for review.

2. The Contractor agrees that all layers of third party liability coverage required herein, primary, umbrella and excess, will have the same starting and expiration date. The Contractor agrees further that all other third party coverages required herein will likewise have concurrent starting and ending dates.

3. For purposes of applying insurance coverage only, all contracts pertaining to the project will be deemed to be executed when finalized and any activity commences in furtherance of performance under this Agreement.

4. The Contractor acknowledges and agrees that any actual or alleged failure on the part of the City to inform the Contractor of non-compliance with any insurance requirement in no way imposes any additional obligations on the City nor does it waive any rights hereunder in this or any other regard.

5. The Contractor will renew the required coverage annually as long as the City, or its employees or agents face an exposure from operations of any type pursuant to this Agreement. This obligation applies whether or not this Agreement is canceled or terminated for any reason. The insurance shall include but not be limited to products and completed operations and discontinued operations, where applicable.

Termination of this obligation is not effective until the City executes a written statement to that effect.

6. Requirements of specific coverage features are not intended as limitations on other requirements or as a waiver of any coverage normally provided by any given policy.

Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue, and is not intended by any party or insured to be all inclusive.

7. Any provision in any of the construction documents dealing with the insurance coverage provided pursuant to these requirements is subordinate to and superseded by the requirements contained herein. These insurance requirements are intended to be separate and distinct from any other provision in this agreement and are intended by the parties here to be interpreted as such.

8. All liability coverage provided according to these requirements must be endorsed to provide a separate aggregate limit for the project that is the subject of this agreement and evidencing products and completed operations coverage for not less than two (2) years after issuance of a final certificate of occupancy by all appropriate government agencies or acceptance of the completed work by the City.

9. The Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge the City or the Contractor for the cost of additional insurance coverage required by this Agreement.

Any such provisions are to be deleted with reference to the City. It is not the intent of the City to reimburse any third party for the cost of complying with these requirements.

5.a
Packet Pg. 224 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 81 There shall be no recourse against the City for payment of premiums or other amounts with respect thereto.
1-49 TRESPASS
The Contractor shall be responsible for all damage or injury, which may be caused on any property by trespass of the Contractor’s employees in the course of their employment whether the said trespass was committed with or without the consent or knowledge of the Contractor. 1-50 SAFETY, SANITARY AND MEDICAL REQUIREMENTS
The Contractor and his subcontractors, if any, and employees shall promptly and fully carry out the existing safety, sanitary and medical requirements as may from time to time be prescribed by the City or by County or State Health Departments to the end that proper work shall be done and the safety and health of the employees and of the community may be observed and safeguarded.

In case such regulations and orders are not observed by the Contractor they may be enforced by the Community Services Director at the Contractor’s expense. 1-51 PROTECTION AND CLEAN UP
The Contractor shall protect and care for all work until completion and acceptance thereof. Before the Contractor makes application for the acceptance of the work, all rubbish, excess earth and rock or surplus materials shall be removed leaving the site in a neat, orderly and presentable condition.
1-52 LABOR DISCRIMINATION
No discrimination shall be made in the employment of persons upon Public Works because of the race, color, religious creed, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age or sexual orientation of such persons except as provided in Government Code §12940, and every contractor for Public Works violating Labor Code §1735 is subject to all penalties imposed for a violation of Chapter 1, of Part 7, of Division 2 of the California Labor Code. 1-53 APPRENTICES
Attention is directed to the provisions of Labor Code §§1777.5 and 1777.6 concerning the employment apprentices by the Contractor or any subcontractor under him. The Contractor and any subcontractor under him shall comply with the requirements of said sections in the employment of apprentices.

Information relative to Apprenticeship Standards Wage Schedules and other requirements may be obtained from the Director of Industrial Relations, Ex Officio the Administrator of Apprenticeship - San Francisco, California or from the Division of Apprenticeship Standards and its branch offices.
1-54 PRECONSTRUCTION CONFERENCE
Before the start of construction, the Community Services Director will arrange to meet with the Contractor to discuss the requirements on such matters as project supervision, on-site inspections, progress, schedules and reports, payment(s) to Contractor(s), safety and other items

5.a
Packet Pg. 225 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 82 pertinent to the project. At this conference, all parties should be prepared to discuss any anticipated problems.
1-55 SUBCONTRACTING LISTING
(a) Any person making a bid or offer to perform the work described in this contract shall in his bid or offer set forth:

1. The name and location of the place of business of each subcontractor who will perform work of labor or render service to the Contractor in or about the construction of the work or improvement or a subcontractor licensed by the State of California, who, under the subcontract to the Contractor, especially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications in an amount in excess of one-half of one percent (.005%) of the Contractor’s total bid.

1. The portion of the work, which will be done by each such subcontractor under this contract. The Contractor shall list only one subcontractor for each such portion as is defined by the Contractor in his bid.

2. His State registration number
(b) No Contractor whose bid is accepted shall, without the consent of the City either:

1. Substitute any person as subcontractor in place of the subcontractor designated in the original bid.

2. Permit any subcontractor to be assigned or transferred or allow it to be performed by any other than the original subcontractor listed in the bid.

3. Sublet or subcontract any portion of the work in excess of one-half of one percent (.005%) of the Contractor’s bid as to which his original bid did not designate a subcontractor.
(c) Subletting or subcontracting any portion of the work as to which no subcontractor was designated in the original bid shall be permitted only in case of public emergency or necessity, and then only after a finding reduced to writing as public record of the awarding authority setting forth the facts constituting such emergency or necessity.

END OF GENERAL CONDITIONS

5.a
Packet Pg. 226 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 83 SUPPLEMENTARY GENERAL CONDITIONS (STATE)
CALIFORNIA STATE REQUIREMENTS- These prevail over conflicting provisions of the General Conditions

1. State Wage Determinations:
a) As required by Labor Code §§1770 et seq., the Contractor shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are on file at the office of the City, which copies shall be made available to any interested party on request. The Contractor shall post a copy of such determination at each job site. b) In accordance with Labor Code §1775, the Contractor shall, as a penalty to the City, forfeit not more than two hundred dollars ($200) for each calendar day or portion thereof, for each worker paid less than the prevailing rates as determined by the Director for the work or craft in which the worker is employed for any public work done under the contract by him or her or by any subcontractor under him or her.

2. Workers' Compensation:
a) In accordance with the provisions of Labor Coded §3700, the Contractor shall secure the payment of compensation to his employees.
b) Prior to beginning work under the Contract, the Contractor shall sign and file with the City the following certification:
“I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for Workers’ Compensation or to undertake selfinsurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the WORK of this Contract.” c) Notwithstanding the foregoing provisions, before the Contract is executed on behalf of the City, a bidder to whom a contract has been awarded shall furnish satisfactory evidence that it has secured in the manner required and provided by law the payment of Workers’ Compensation.

3. Apprentices on Public Works: The Contractor shall comply with all applicable provisions of Labor Code §1777.5 relating to employment of apprentices on public works.

4. Working Hours: The Contractor shall comply with all applicable provisions of Labor Code §§1810 to 1815, inclusive, relating to working hours. The Contractor shall, as a penalty to the City, forfeit twenty-five dollars ($25) for each worker employed in the execution of the Contract by the Contractor or by any subcontractor for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any one (1) calendar day and forty (40) hours in any one (1) calendar week, unless such worker receives compensation for all hours worked in excess of eight (8) hours at not less than one and one-half (1.5) times the basic rate of pay.

5. Contractor Not Responsible For Damage Resulting From Certain Acts of God:

As provided in Public Contract Code §7105, the Contractor shall not be responsible for the cost of repairing or restoring damage to the work which damage is determined to have been proximately caused by an act of God, in excess of five percent (5%) of the contracted amount, provided, that the work damaged was built in accordance with accepted and applicable building standards and the plans and specifications of the City. The Contractor shall obtain insurance to

5.a
Packet Pg. 227 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 84 indemnify the City for any damage to the Work caused by an act of God if the insurance premium is a separate bid item in the bidding schedule for the work. For purposes of this section, the term “acts of God” shall include only the following occurrences or conditions and effects: earthquakes in excess of a magnitude of three and one-half (3.5) on the Richter Scale and tidal waves.

6. Notice of Completion: In accordance with Civil Code §§9204 and 9208, within fifteen (15) days after date of acceptance of the work by the City’s governing body, the City will file, in the County Recorder's office, a Notice of Completion of the work.

7. Unpaid Claims: If, at any time prior to the expiration of the period for service of a stop payment notice, there is served upon the City a stop payment notice as provided in Civil Code §§9350 et seq., the City shall, until the discharge thereof, withhold from the monies under its control so much of said monies due or to become due to the Contractor under this Contract as shall be sufficient to answer the claim stated in such stop payment notice and to provide for the reasonable cost of any litigation thereunder; provided, that if the construction manager shall, in its discretion, permit the Contractor to file with the City the bond referred to in Civil Code §9364, said monies shall not thereafter be withheld on account of such stop payment notice.

8. Concrete Forms, Falsework, and Shoring: The Contractor shall comply fully with the requirements of section 1717 of the Construction Safety Orders, State of California, Department of Industrial Relations, regarding the design of concrete forms, falsework and shoring, and the inspection of same prior to placement of concrete. Where the said section 1717 requires the services of a civil engineer registered in the State of California to approve design calculations and working drawings of the falsework or shoring system, or to inspect such system prior to placement of concrete, the Contractor shall employ a registered civil engineer for these purposes, and all costs therefore shall be included in the price named in the Contract for completion of the work as set forth in the Contract Documents.

9. Retainage From Monthly Payments: Pursuant to Public Contract Code §22300, the Contractor may substitute securities for any money withheld by the City to insure performance under the Contract. At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the City or with a State or Federally chartered bank as the escrow agent, who shall return such securities to the Contractor upon satisfactory completion of the Contract. Deposit of securities with an escrow agent shall be subject to a written agreement between the escrow agent and the City which provides that no portion of the securities shall be paid to the Contractor until the City has certified to the escrow agent, in writing, that the Contract has been satisfactorily completed. The City will not certify that the Contract has been satisfactorily completed until at least thirty (30) days after filing by the City of a Notice of Completion. Securities eligible for investment under Public Contract Code §22300 shall be limited to those listed in Government Code §16430 and to bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the Contractor and the City.

10. Public Works Contracts; Assignment to Awarding Body: In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Contractor or subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under section 4 of the Clayton Act (15 U.S.C. sec. 15) or under the Cartwright Act (Chapter 2 (commencing with section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgement by the parties.

5.a
Packet Pg. 228 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 85 11. Payroll Records; Retention; Inspection; Noncompliance Penalties; Rules and Regulations: (a) Each contractor and subcontractor shall keep accurate payroll records, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following:
(1) The information contained in the payroll record is true and correct. (2) The employer has complied with the requirements of Sections 1771, 1811, and 1815 for any work performed by his or her employees on the public works project. (b) The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of the contractor on the following basis:
(1) A certified copy of an employee’s payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request. (2) A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection or furnished upon request to a representative of the body awarding the contract and the Division of Labor Standards Enforcement of the Department of Industrial Relations. (3) A certified copy of all payroll records enumerated in subdivision (a) shall be made available upon request by the public for inspection or for copies thereof. However, a request by the public shall be made through either the body awarding the contract or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph (2), the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the contractor, subcontractors, and the entity through which the request was made. The public may not be given access to the records at the principal office of the contractor. (c) Unless required to be furnished directly to the Labor Commissioner in accordance with paragraph (3) of subdivision (a) of Section 1771.4, the certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as the forms provided by the division. The payroll records may consist of printouts of payroll data that are maintained as computer records, if the printouts contain the same information as the forms provided by the division and the printouts are verified in the manner specified in subdivision (a).
(d) A contractor or subcontractor shall file a certified copy of the records enumerated in subdivision (a) with the entity that requested the records within 10 days after receipt of a written request. (e) Except as provided in subdivision (f), any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by the awarding body or the Division of Labor Standards Enforcement shall be marked or obliterated to prevent disclosure of an individual’s name, address, and social security number. The name and address of the contractor awarded the contract or the subcontractor performing the contract shall not be marked or obliterated. Any copy of records made available for inspection by, or furnished to, a multiemployer Taft-Hartley trust fund (29 U.S.C. Sec. 186(c)(5)) that requests the records for the purposes of allocating contributions to participants shall be marked or obliterated only to prevent disclosure of an individual’s full social security number, but shall provide the last four digits of the social security number. Any copy of records made available for inspection by, or furnished to, a joint labor-management committee established pursuant to the federal Labor Management Cooperation Act of 1978 (29 U.S.C. Sec. 175a) shall be marked or obliterated only to prevent disclosure of an individual’s social security number.

5.a
Packet Pg. 229 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 86 (f) An employer shall not be liable for damages in a civil action for any reasonable act or omission taken in good faith in compliance with this subdivision. (g) The contractor shall inform the body awarding the contract of the location of the records enumerated under subdivision (a), including the street address, city, and county, and shall, within five working days, provide a notice of a change of location and address. (h) The contractor or subcontractor has 10 days in which to comply subsequent to receipt of a written notice requesting the records enumerated in subdivision (a). In the event that the contractor or subcontractor fails to comply within the 10-day period, he or she shall, as a penalty to the state or political subdivision on whose behalf the contract is made or awarded, forfeit one hundred dollars ($100) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due. A contractor is not subject to a penalty assessment pursuant to this section due to the failure of a subcontractor to comply with this section.
(i) The body awarding the contract shall cause to be inserted in the contract stipulations to effectuate this section.

12. Cultural Resources: The Contractor’s attention is directed to the provisions of the Clean Water Grant Program Bulletin 76A which augments the National Historic Preservation Act of 1966 (16 U.S.C. 470) as specified under section 01560, “Temporary Environmental Controls” of the General Requirements.

13. Protection of Workers In Trench Excavations: As required by Labor Code §6705 and in addition thereto, whenever work under the Contract involves the excavation of any trench or trenches five (5) feet or more in depth, the Contractor shall submit for acceptance by the City or by a registered civil or structural engineer, employed by the City, to whom authority to accept has been delegated, in advance of excavation, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation, of such trench or trenches. If such plan varies from the shoring system standards established by the Construction Safety Orders of the Division of Industrial Safety, the plan shall be prepared by a registered civil or structural engineer employed by the Contractor, and all costs therefore shall be included in the price named in the Contract for completion of the work as set forth in the Contract Documents. Nothing in this section shall be deemed to allow the use of a shoring, sloping, or other protective system less effective than that required by the Construction Safety Orders. Nothing in this section shall be construed to impose tort liability on the City, the Construction Manager, the Design Consultant or any of their officers, agents, representatives, or employees.

14. Travel and Subsistence Pay:
a) As required by Labor Code §1773.1, the Contractor shall pay travel and subsistence payments to each worker needed to execute the work, as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with this section. b) To establish such travel and subsistence payments, the representative of any craft, classification or type of worker needed to execute the contracts shall file with the Department of Industrial Relations fully executed copies of collective bargaining agreements for the particular craft, classification or type of work involved. Such agreements shall be filed within ten (10) days after their execution and thereafter shall establish such travel and subsistence payments whenever filed thirty (30) days prior to the call for bids.

5.a
Packet Pg. 230 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 87 15. Removal, Relocation or Protection to Existing Utilities:
a) In accordance with the provisions of Government Code §4215, any contract to which a public agency as defined in Government Code §4401 is a party, the public agency shall assume the responsibility, between the parties to the contract, for the timely removal, relocation, or protection of existing main or trunkline utility facilities located on the site of any construction project that is a subject of the contract, if such utilities are not identified by the public agency in the plans and specifications made a part of the invitation for bids. The agency will compensate Contractor for the costs of locating, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating such utility facilities not indicated in the plans and specifications with reasonable accuracy and for equipment on the project necessarily idled during such work.
b) The Contractor shall not be assessed liquidated damages for delay in completion of the project, when such delay was caused by the failure of the public agency or the city of the utility to provide for removal or relocation of such utility facilities. c) Nothing herein shall be deemed to require the public agency to indicate the presence of existing service laterals or appurtenances when the presence of such utilities on the site of the construction project can be inferred from the presence of other visible facilities, such as buildings, meter and junction boxes, on or adjacent to the site of construction; provided, however, nothing herein shall relieve the public agency from identifying main or trunklines in the plans and specifications.
d) If the Contractor while performing the contract discovers utility facilities not identified by the public agency in the contract plans or specifications, he shall immediately notify the public agency and utility in writing.
e) The public utility, where they are the City, shall have the sole discretion to perform such repairs or relocation work or permit the Contractor to do such repairs or relocation work at a reasonable price.

16. Contractor License Requirements: In accordance with Business and Professions Code §7028.15, a licensed contractor shall not submit a bid to a public agency unless his or her contractor’s license number appears clearly on the bid, and the license expiration date is stated.

Any bid not containing this information, or a bid containing information which is subsequently proven false, shall be considered nonresponsive and shall be rejected by the public agency.

17. Prohibiting Work by Certain Contractors: Pursuant to the provisions in Labor Code §§1777.1 and 1777.7, the Labor Commissioner publishes and distributes a list of contractors ineligible to perform work as a subcontractor on a public works project. This list of debarred contractors is available from the Department of Industrial Relations web site at:
http://www.dir.ca.gov/DLSE/Debar.html.

END OF CALIFORNIA STATE REQUIREMENTS

END OF SUPPLEMENTARY GENERAL CONDITIONS

5.a
Packet Pg. 231 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 88 SPECIAL PROVISIONS

1. ORDER OF WORK
Prior to commencement of any work on the project, a preconstruction conference will be held for the purpose of review and discussion of progress schedule and construction procedures. At the discretion of the Community Services Director, periodic meetings involving project personnel (Contractor, utility and others) will be held for the purpose of coordinating project activities.

2. STARTING AND COMPLETION OF WORK
The work called for in these contract documents shall commence within (10) calendar days after that date set out in the Notice to Proceed issued by the City, and shall be diligently pursued to completion within (90) calendar days of said date.

3. FAILURE TO COMPLETE ON TIME AND LIQUIDATED DAMAGES
(See General Conditions 1-19) It is agreed by the parties to the contract that in case all work called for under the contract is not completed before or upon the expiration of the time limits set forth in these Special Provisions, damages will be sustained by the City and that it will be impracticable to determine the actual damage by which the City will sustain in the event of and by reason of such delay and it is therefore agreed that the Contractor will pay to the City the sum of five hundred dollars ($500) per day for each and every day of delay beyond the time prescribed to complete the work.

4. MAINTAINING TRAFFIC
The Contractor shall maintain two way traffic in the work area in accordance with the “Manual of Traffic Controls for Construction and Maintenance Work Zones” and the MUTCD, 1990 Edition or as modified, available through the State of California, Department of Transportation, 1900 Royal Oaks Drive, Sacramento, California 95815.

Personal vehicles of the Contractor’s employees shall not be parked on the traveled way at any time, including any section closed to public traffic.

5. PERMIT FEES
. The General Contractor shall be responsible for paying all permit fees to the City.

6. CONSTRUCTION SIGN
The Contractor shall provide a four (4) foot tall by eight (8) foot wide construction sign to be visible to the public and maintained in good order for the duration of construction. Artwork for the sign shall be provided to the Contractor by the City.

5.a
Packet Pg. 232 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 89 Procurement
This Agreement requires the Contractor and its subcontractors, if any, to:
1) Perform the grant activity in accordance with Federal, State and local housing and building codes as are applicable.
2) Comply with the applicable State and Federal requirements described in Attachments A-F of this Contract which pertain to among other things, labor standards, non-discrimination, Americans with Disabilities Act, Equal Employment Opportunity, Drug-Free Workplace, and the Immigration Reform and Control Act.
3) Maintain at least the minimum State-required Workers’ Compensation insurance for those employees who will perform the grant activity or any part of it. 4) Maintain, if so required by law, unemployment insurance, disability insurance and liability insurance in an amount to be determined by the State which is reasonable to compensate any person, firm or corporation who may be injured or damaged by the contractor or any subcontractor in performing the grant activity or any part of it. 5) Retain all books, records, accounts, documentation and all other materials relevant to the agreement for a period of three (3) year from date of termination of the Contract, or three (3) years from the conclusion or resolution of any and all audits or litigation relevant to the Contract or this standard agreement and any amendments, whichever is later. 6) Permit the State, Federal government, the Bureau of State audits, the Department of Housing and Community Development and/or their representative, upon reasonable notice unrestricted access to any or all books, records, accounts, documentation and all other materials relevant to the agreement for the purpose of monitoring, auditing or otherwise examining said materials.

5.a
Packet Pg. 233 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 90 Attachment A
EQUAL OPPORTUNITY STANDARD CONTRACT LANGUAGE:

ALL CONTRACTS AND SUBCONTRACTS

1. The Civil Rights, HCD and Age Discrimination Acts Assurances:

During the performance of this Contract, the City of El Centro assures that no otherwise qualified person shall be excluded from participation or employment, denied program benefits, or be subjected to discrimination based on race, color, national origin, gender, age or disability, under any program or activity funded by this contract, as required by Title VI of the Civil Rights Act of 1964, Title I of the Housing and Community Development Act of 1974, as amended, and the Age Discrimination Act of 1975, and all implementing regulations.

2. The Training, Employment and Contracting Opportunities for Business and Lower Income Persons Assurance of Compliance:
a) The work to be performed under this Contract is on a project assisted under a program providing direct Federal financial assistance from the Department of Housing and Urban Development and is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701u. Section 3 requires that to the greatest extent feasible, opportunities for training and employment be given lower income residents of the project area and contracts for Work in connection with the project be awarded to business concerns which are located, or owned in substantial part by persons residing, in the area of the project.
b) The parties to this Contract will comply with the provisions of said Section 3 and the regulations issued pursuant thereto by the Secretary of Housing and Urban Development set forth in 24 CFR Part 135, and all applicable rules and orders of the Department issued thereunder prior to the execution of this contract. The parties to this Contract certify and agree that they are under no contractual or other disability which would prevent them from complying with these requirements. c) The City of El Centro requires that the Contractor send to each labor organization or representative of workers with which it has a collective bargaining agreement or other contract or understanding, if any, a notice advising the labor organization or worker's representative of the Contractor’s commitments under this Section 3 clause and in addition shall post copies of the notice in conspicuous places available to employees and applicants for employment or training.
d) The City of El Centro and the Contractor will include these Section 3 clauses in every Contract and subcontract for Work in connection with the project and will, at the direction of the State, take appropriate action pursuant to the Contract upon a finding that the City of El Centro or the Contractor or any subcontractor is in violation of regulations issued by the Secretary of Housing and Urban Development, 24 CFR Part 135 and, will not let any Contract unless the City of El Centro or the Contractor or any subcontractor has first provided it with a preliminary statement of ability to comply with the requirements of these regulations.
e) Compliance with the provisions of Section 3, the regulations set forth in 24 CFR Part 135, and all applicable rules and orders of the Department issued thereunder prior to the execution of the Contract shall be a condition of the Federal financial assistance

5.a
Packet Pg. 234 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 91 provided to the project, binding upon the City of El Centro, its successors and assigns.

Failure to fulfill these requirements shall subject the City of El Centro, the Contractor and any subcontractors, its successors and assigns to those sanctions specified by the grant or contract through which Federal assistance is provided, and to such sanctions as are specified by 24 CFR Part 135.

3. State Nondiscrimination Clause:

1. During the performance of this Contract, the Contractor and its subcontractors shall not unlawfully discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, age (over 40), gender, gender identity, gender expression or sexual orientation. The Contractor and any subcontractors shall ensure that the evaluation and treatment of their employees and applicants for employment are free of such discrimination. The Contractor and any subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Government Code §§12900 et seq.) and the applicable regulations promulgated thereunder (California Code of Regulations, Title 2, section 7258.0 et seq.). The applicable regulations of the Fair Employment and Housing Commission implementing Government Code §12990, set forth in Chapter 5 of Division 4 of Title 2 of the California Code of Regulations are incorporated into this Contract by reference and made a part hereof as if set forth in full. The Contractor and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement.

2. The Contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the Contract.

5.a
Packet Pg. 235 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 92 EQUAL OPPORTUNITY CLAUSE AND FEDERAL EQUAL EMPLOYMENT OPPORTUNITY

CONSTRUCTION CONTRACT SPECIFICATIONS
A. Equal Opportunity Clause. During the performance of this Contract, the Contractor agrees as follows:

1. The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, gender or national origin. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, gender or national origin.

Such action shall include, but not be limited to, employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.

2. The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, gender or national origin.

3. The Contractor will send to each labor union or representative of workers with which the Contractor has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.

4. The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations and relevant orders of the Secretary of Labor.

5. The Contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations and orders of the Secretary of Labor, or pursuant thereto, and will permit access to its books, records and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations and orders.

6. In the event of the Contractor’s noncompliance with the discrimination clauses of this Contract or with any of the said rules, regulations or orders, this Contract may be canceled, terminated or suspended in whole or in part and the Contractor may be declared ineligible for further government contracts or Federally-assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rules, regulations or orders of the Secretary of Labor, or as otherwise provided by law.

7. The Contractor will include the portion of the sentence immediately preceding section (1) and the provisions of sections (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations or orders of the Secretary of Labor issued pursuant to section 504 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The Contractor will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved

5.a
Packet Pg. 236 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 93 in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request the United States to enter into such litigation to protect the interests of the United States.

The City further agrees that it will be bound by the above equal opportunity clause with respect to its own employment practices when it participates in Federally-assisted construction work; provided, that if the applicant so participating is a State or local government, the above equal opportunity clause is not applicable to any agency, instrumentality or subdivision of such government which does not participate in work on or under the Contract.

The City agrees that it will assist and cooperate actively with the administering agency and the Secretary of Labor in obtaining the compliance of the Contractor and any subcontractors with the equal opportunity clause and the rules, regulations and relevant orders of the Secretary of Labor, that it will furnish the administering agency and the Secretary of Labor such information as they may require for the supervision of such compliance, and that it will otherwise assist the administering agency in the discharge of the agency's primary responsibility for securing compliance.

The City further agrees that it will refrain from entering into any contract or contract modification subject to Executive Order 11246 of September 24, 1965, with a contractor debarred from, or who has not demonstrated eligibility for, government contracts and Federally-assisted construction contracts, pursuant to the Executive Order and will carry out such sanctions and penalties for violation of the equal opportunity clause as may be imposed upon contractors and subcontractors by the administering agency or the Secretary of Labor pursuant to Part II, Subpart D of the Executive Order. In addition, the City agrees that if it fails or refuses to comply with these undertakings, the administering agency may take any or all of the following actions: cancel, terminate or suspend in whole or in part this grant (contract, loan, insurance, guarantee); refrain from extending any further assistance to the City under the program with respect to which the failure or refund occurred until satisfactory assurance of future compliance has been received from the City; and refer the case to the Department of Justice for appropriate legal proceedings.

B. Federal Equal Employment Opportunity Construction Contract Specifications.

1. As used in these specifications:
a. “Covered area” means the geographical area described in the solicitation from which this Contract resulted.
b. “Director” means Director, Office of Federal Contract Compliance Programs, United States Department of Labor, or any person to whom the Director delegates authority.
c. “Employer identification number” means the Federal social security number used on the Employer's Quarterly Federal Tax Return, U.S. Treasury Department Form 941.
d. “Minority” includes:
(1) Black (all persons having origins in any of the Black African racial groups not of Hispanic origin).

5.a
Packet Pg. 237 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 94 (2) Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American or other Spanish culture or origin, regardless of race). (3) Asian and Pacific Islander (all persons having origins in any of the original peoples of the Far East, southeast Asia, the Indian subcontinent or the Pacific Islands).
(4) American Indian or Alaskan native (all persons having origins in any of the original peoples of North America and maintaining identifiable tribal affiliations through membership and participation or community identification).

2. Whenever the Contractor or any subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of ten thousand dollars ($10,000) the provisions of these specifications and the notice which contains the applicable goals for minority and female participation and which is set forth in the solicitations from which this Contract resulted.

3. If the Contractor is participating (pursuant to 41 CFR 60-4.5) in a Hometown Plan approved by the U. S. Department of Labor in the covered area either individually or through an association, its affirmative action obligations on all work in the plan area (including goals and timetables) shall be in accordance with that plan for those trades which have unions participating in the plan. The Contractor must be able to demonstrate his participation in and compliance with the provisions of any such Hometown Plan. The Contractor or any subcontractor participating in an approved plan is individually required to comply with its obligations under the EEO clause, and to make a good faith effort to achieve each goal under the plan in each trade in which it has employees. The overall good faith performance by other contractors or subcontractors toward a goal in an approved plan does not excuse the Contractor's or any subcontractor's failure to take good faith efforts to achieve the plan's goals and timetables.

4. The Contractor shall implement the specific affirmative action standards provided in sections 7.a. through 7.p. of these specifications. The goals set forth in the solicitation from which this Contract resulted are expressed as percentages of the total hours of employment and training of minority and female utilization the Contractor should reasonably be able to achieve in each construction trade in which it has employees in the covered area. Covered construction contractors performing construction work in geographical areas where they do not have a Federal or Federally-assisted construction contract shall apply the minority and female goals established for the geographical area where the work is being performed. Goals are published periodically in the Federal Register in notice form and such notices may be obtained from any Office of Federal Contract Compliance Programs or from Federal procurement contracting officers. The Contractor is expected to make substantially uniform progress in meeting its goals in each craft during the period specified.

5. Neither the provisions of any collective bargaining agreement, nor the failure by a union with whom the Contractor has a collective bargaining agreement, to refer either minorities or women shall excuse the Contractor's obligations under these specifications, Executive Order 11246, or the regulations promulgated pursuant thereto.

6. In order for the non-working training hours of apprentices and trainees to be counted in meeting the goals, such apprentices and trainees must be employed by the Contractor during the training period, and the Contractor must have made a commitment to employ

5.a
Packet Pg. 238 Attachment: Facade Bidding docments to Council (6186 : Authorization to bid CDBG Facade Program) 95 the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities. Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor.

7. The Contractor shall take specific affirmative actions to ensure equal employment opportunity. The evaluation of the Contractor's compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The Contractor shall document these efforts fully and shall implement affirmative action steps at least as extensive as the following:
a. Ensure and maintain a working environment free of harassment, intimidation and coercion at all sites, and in all facilities at which the Contractor's employees are assigned to work. The Contractor, where possible, will assign two or more women to each construction project. The Contractor shall specifically ensure that all foremen, superintendents and other on-site supervisory personnel are aware of and carry out the Contractor's obligation to maintain such a working environment, with specific attention to minority or female individuals working at such sites or in such facilities.
b. Establish and maintain a current list of minority and female recruitment sources, provide written notification to minority and female recruitment sources and to community organizations when the Contractor or its unions have employment opportunities available, and maintain a record of the organizations' responses.
c. Maintain a current file of the names, addresses and telephone numbers of each minority and female off-the-street applicant and minority or female referral from a union, a recruitment source or community organization and of what action was taken with respect to each such individual. If such individual was sent to the union hiring hall for referral and was not referred back to the Contractor by the union or, if referred, not employed by the Contractor, this shall be documented in the file with the reason therefore, along with whatever additional actions the Contractor may have taken. d. Provide immediate written notification to the Director when the union or unions with which the Contractor has a collective bargaining agreement has not referred to the Contractor a minority person or woman sent by the Contractor or when the Contractor has other information that the union referral process has impeded the Contractor's efforts to meet its obligations. e. Develop on-the-job training opportunities and/or participate in training programs for the area which expressly include minorities and women, including upgrading programs and apprenticeship and trainee programs relevant to the Contractor's employment needs, especially those programs funded or approved by the Department of Labor. The Contractor shall provide notice of these programs to the sources compiled under 7.b. above. f. Disseminate the contractor's EEO policy by providing notice of the policy to unions and training programs and requesting their cooperation in assisting the Contractor in meeting its EEO obligations; by including it in any policy manual and collective bargaining agreement; by publicizing it in the company newspaper, annual report, etc; by specific review of the policy with