AGENDA
CITY OF EL CENTRO
CITY COUNCIL
TUESDAY, JULY 7, 2026
City Hall Regular Meeting 3:30 PM
CITY HALL
COUNCIL CHAMBERS
1275 MAIN STREET
EL CENTRO, CA 92243
The public may attend in person. Any member of the public attending in person and wishing to make a comment is asked to complete a speaker slip and follow the instructions below regarding “Notice to the Public”. Any member of the public is invited to submit public comments in advance of the meeting to be answered at the meeting. Please email your questions to [email protected] or call 760-337-4515 by July 7, 2026.
COUNCIL MEMBERS, STAFF AND THE PUBLIC MAY ATTEND VIA ZOOM.
To participate and make a public comment in person, via Zoom or telephone, please raise your hand, speak up and introduce yourself.
Join Zoom Meeting:
https://us06web.zoom.us/j/4180375132?pwd=Rmo5UjZ1cWdyV1VoWUhSZWp6R0tVZz09&omn=88203681430 Optional dial-in number: (669) 444-9171
Meeting ID: 418 037 5132 Passcode: 5iHJYM
Public comments via Zoom are subject to the same time limits as those in person.
Mayor and Council Members may be reached at (760) 336-8989.
Mayor:
Mayor Pro-Tem:
Council Members:
Michael Crankshaw
Claudia Camarena
Sylvia Marroquin
Marty Ellett
Sonia Carter
City Manager: Robert Sawyer
City Attorney: Joanna Hoff
City Clerk: Norma Wyles
NOTICE TO THE PUBLIC
This is a public meeting. If there is an item on the agenda on which you wish to be heard, you are asked to complete a blue speaker slip and submit it to the City Clerk prior to the start of the meeting. Persons wishing to address the Council are not required to identify themselves (Gov’t Code § 54953.3); however, this information assists the Mayor by ensuring that all persons wishing to address the Council are recognized and also assists the City Clerk in preparing the City Council meeting minutes. When the item is announced and your name is called by the Mayor, please step to the podium and state your name for the record. Unless the Mayor extends the time, there is a three (3) minute time limit for each public presentation. If you wish to address the Council concerning any other matter not appearing on the agenda, you may do so during the public comment portion of the agenda. However, you may not show a visual presentation without review of that material. If you do so, you will be considered out of order.
* Any information provided on the “Speaker Slip” is voluntary and will be public record 6:00 OPEN SESSION
ALL TIMES ARE APPROXIMATE AND MAY VARY:
CALL TO ORDER:
ROLL CALL BY CITY CLERK:
INVOCATION:
PLEDGE OF ALLEGIANCE:
CITY ATTORNEY REPORT ON CLOSED SESSION:
(TIME MAY VARY) PUBLIC COMMENTS:
The City Council welcomes your input. At this time, members of the public may address the City Council on any matter not listed on the posted agenda. Pursuant to the Brown Act, no action will be taken on any issue brought forth under Public Comments. We ask that you please complete a “Speaker Slip” and submit it to the City Clerk prior to the start of the meeting. Although you are not required to identify yourself (Gov’t Code §54953.3); this information on the “Speaker Slip” assists the Mayor that all persons wishing to address the Council are recognized and also assists the City Clerk in preparing the City Council meeting minutes. Unless the Mayor extends the time, there is a three (3) minute time limit for each public presentation. * Any information provided on the “Speaker Slip” is voluntary and will be public record.
PRESENTATIONS AND ANNOUNCEMENTS BY MAYOR:
1. Proclamation - Parks and Recreation Month, July 2026
2. El Centro Rotary Club - Adoption of Park at 8th and Vine Street.
CONSENT AGENDA (ITEMS 3-4):
3. Approval of the City Council meeting minutes for the meeting of June 16, 2026 and June 26, 2026.
4. Adopt Resolution No. 26- , RESOLUTION OF THE CITY OF EL CENTRO,
CALIFORNIA AUTHORIZING THE LEVY OF A SPECIAL TAX IN COMMUNITY FACILITIES DISTRICT NO. 2007-1 (LEGACY RANCH) FOR FISCAL YEAR 2026/2027.
NEW BUSINESS:
5. Discussion and any necessary action regarding amending Chapter 4, Article III of the City Municipal Code regarding wagering limits for cardrooms.
Presentation: Angel Hernandez, Community Development Director Recommendation:
The City Council is to consider the information presented in this report and take such
action as the Council determines to be appropriate. If the Council determines to approve the proposal as presented, it may move to:
Introduce Ordinance No. 26- , AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, AMENDING CHAPTER 4, ARTICLE III “POOLROOMS, BOWLING ALLEYS AND CARD, ETC., ROOMS” OF THE EL CENTRO MUNICIPAL CODE, waive reading and approve as first reading and authorized City Clerk to place on the next agenda for second reading and adoption.
6. El Centro Police Department's Commemorative 250th Anniversary Badge Program.
Presentation: Kelly Brown, Police Chief
Recommendation:
Approve the El Centro Police Department's Commemorative 250th Anniversary Badge Program in recognition of the United States Semi-quincentennial Celebration and authorize sworn personnel to wear the commemorative badge from July 4, 2026, through December 31, 2026.
7. Approval of Plans and Specifications and Authorization to Bid for Gillett Road Rehabilitation Project LPPSB1L-5169(064)
Presentation: Abraham Campos, Public Works Director/City Engineer Recommendation:
Approve the Plans and Specifications for the Gillett Road Rehabilitation Project LPPSB1L5169(064) and authorize staff to release for public bidding.
8. Opioid Settlement Funds Community Enhancement Projects.
Presentation: Rene McNish , Commander
Recommendation:
Approve the use of Opioid Settlement Funds to support two Opioid Abatement Initiatives:
(1) An allocation of $22,500 to the El Centro Police Athletic League (PAL) for Project Deter, a youth opioid misuse prevention program; and (2) the assignment of one (1) Police Sergeant and one (1) Police Officer to implement the El Centro Police Department's Officer-Based Opioid Remediation Program.
9. Resolution of Intent to Submit Nomination of Census Tract No. 112.02 (GEOID 6025011202) and Census Tract No. 114 (GEOID 6025011400) for Consideration as Qualified Opportunity Zones
Presentation: Adriana Nava, Community Services Director Recommendation:
Adopt Resolution No. 26- , RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EL CENTRO DECLARING ITS INTENT TO SUBMIT NOMINATION OF CENSUS TRACTS FOR CONSIDERATION AS QUALIFIED OPPORTUNITY ZONES.
10. Discussion and related action regarding an extension to the Agreement with Catholic Charities Diocese of San Diego for the Working Hands Workforce Development Program Presentation: Adriana Nava, Community Services Director Recommendation:
Staff recommends approval of a one (1) year extension of the Agreement with Catholic Charities Diocese of San Diego for the continued implementation of the Working Hands Workforce Development Program.
LEGISLATIVE ACTION:
INFORMATIONAL ITEMS:
11. Update Emergency Declaration - WWTP Bar Screen Failure
12. Received and referred to Community Development Department, Application for Alcoholic Beverage License West Coast Wings V LLC Buffalo Wild Wings 510 E Danendberg Dr. El Centro, CA 92243
13. Certificate of Mailing Notice of Application to the City, County and Municipal Governmental Agencies Utilities Commision June 22, 2026
TASK FORCE /CONFERENCE REPORTS AND MAYOR - COUNCIL MEMBER REPORTS:
CITY MANAGER REPORT:
ADJOURNMENT:
Materials related to an item on this Agenda submitted to the City Council after distribution of the agenda packet will be available for public inspection at the Office of the City Clerk, 1275 Main Street, El Centro, California 92243, Monday-Friday during normal business hours.
In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, you should contact the office of the City Clerk at (760) 337-4515. Notification at least 48 hours prior to the meeting will enable the City to make reasonable arrangements to assure accessibility to this meeting.
City Council of the City of El Centro
1275 W. Main Street
El Centro, CA 92243
SUBMITTED
ACTION ITEM (ID # 2026-156)
Item: 1.
Meeting: 7/7/2026 3:30 PM
Department: City Manager
Category: Presentation
Prepared by: Gloria Garcia , Staff
Asssistant
Department Head:
DOC ID: 2026-156
Proclamation - Parks and Recreation Month, July 2026
CITY MANAGER'S RECOMMENDATION:
N/A
FISCAL IMPACT:
N/A
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTOR'S LICENSE, REFERENCE CHECKS, INSURANCE, ETC.:
N/A
BACKGROUND:
N/A
DISCUSSION:
N/A
CONCLUSION:
N/A
ATTACHMENTS:
None
City Council of the City of El Centro
1275 W. Main Street
El Centro, CA 92243
SUBMITTED
ACTION ITEM (ID # 2026-203)
Item: 2.
Meeting: 7/7/2026 3:30 PM
Department: City Clerk
Category: Presentation
Prepared by: Norma Wyles, City Clerk
Department Head:
DOC ID: 2026-203
El Centro Rotary Club - Adoption of Park at 8th and Vine Street.
CITY MANAGER'S RECOMMENDATION:
FISCAL IMPACT:
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTOR'S LICENSE, REFERENCE CHECKS, INSURANCE, ETC.:
BACKGROUND:
DISCUSSION:
CONCLUSION:
ATTACHMENTS:
1. Adoption of Park on 8th Vine
ADOPTION OF
PARK ON 8TH &
VINE
Prepared for the City of El Centro
By El Centro Rotary Club
6/30/2026 Sample Footer Text
1 OVERVIEW
1. Introducing Rotary of El Centro
2. Site Context
3. Plan for Park
4. Conceptual Ideas to Strengthen
Community Engagement and Enrichment
5. Q&A
6/30/2026 Sample Footer Text
2 INTRODUCTION
Rotary International is a global service organization, is one of the largest service organizations in the world.
The self-declared mission of Rotary, is to "provide
service to others, promote integrity, and advance world understanding, goodwill, and peace through [the]
fellowship of business, professional, and community
leaders".
6/30/2026 Sample Footer Text 3
The Rotary Club of El Centro, California was established in May of 1921 by Rotary Club 33 of San Diego, California.
El Centro was the first club sponsored by San Diego Rotary.
El Centro Rotary is among the oldest, largest and most
successful service clubs in the Imperial Valley. Its membership represents local professionals which desire to give back to their community through service.
“Service Above Self”
6/30/2026 Sample Footer Text 4
ROTARY INTERNATIONAL MOTTO
ADOPTION OF PARK
ON 8TH AND VINE
STREETS
6/30/2026 Sample Footer Text 5
• Stewards of the Community
• Opportunities for Civic Engagement
• POP- UP Opportunities
• Pilot Park for Larger Civic Engagement
• Pilot Park for Potential Infill Park Space
• Choreographing Space
6/30/2026 Sample Footer Text 6
LOCATION
Area Impact on engagement Opportunities
Singe Family Residential
Promoting walkable events and
engaging and promoting
community connectivity and
engagement
Access to engagement
Multi-Family Residential
In addition to community
engagement this space can
serve as a location to host
parties and events to those in
Multi-Family Housing
Pilot Infill Park for other similar
areas in the City of El Centro
Harding School Engagement and partnership
with local elementary schools
Potential Pilot Park for infill park
development
Bucklin Park
Events can be created at a
smaller scale and be moved
when larger turn out is produced
Pilot Park for Larger Parks
Main Arterial Street (8th) Traffic Promotion and intrigue Vacant Lot to the North Potential infill project - Potential Expansion 6/30/2026 Sample Footer Text 7
SITE CONTEXT
6/30/2026 Sample Footer Text
8 • Rotarian Signage & Peace Pole
– Symbolism A peace pole is a
monument that displays the
message "May Peace Prevail
on Earth" in multiple languages,
symbolizing a global
commitment to peace and
unity.
• Large Event Space for Pop-Up
Events and Pilot Projects
• Colorful Tree Palette bring
identity to the pocket park
• Potential for Community
Gardening
• Use of Existing Trees & Hedges
Park Concept
6/30/2026 Sample Footer Text 9
TREE SPECIES
Arizona Ash in the Fall
Deciduous Tree
Chinese Pistache in the Fall
Deciduous Tree
Indian Rosewood
Evergreen Tree
Large Canopy for Shade
PEACE POLE
6/30/2026 Sample Footer Text 10
A peace pole is a monument that displays the
message "May Peace Prevail on Earth" in multiple
languages, symbolizing a global commitment to
peace and unity.
Purpose and Symbolism
Peace poles serve as visible reminders to cultivate
peace in thought, word, and action.
They symbolize humanity’s shared desire for a world
at peace and inspire communities to work together
toward harmony and goodwill.
Each pole carries the universal message, often in
several languages, reflecting multicultural
understanding and the global nature of the peace
movement
POP- UP EVENTS
6/30/2026 Sample Footer Text 11
Book Club Movie Night Picnic Music
Dancing Roller Rink Art in the Park
HOLIDAY EVENTS
6/30/2026 Sample Footer Text 12
Pilot Project for Holiday Events
• Pumpkin Patch
• Fall Event
• Christmas Themed Events
• BBQ for Veterans
6/30/2026 Sample Footer Text 13
EVENTS
Standard Events
• A place to hold Birthday events
or equivalent
CONCLUSION
Q&A
6/30/2026 Sample Footer Text
14 City Council of the City of El Centro
1275 W. Main Street
El Centro, CA 92243
SUBMITTED
ACTION ITEM (ID # 2026-214)
Item: 3.
Meeting: 7/7/2026 3:30 PM
Department: City Clerk
Category: Action Item
Prepared by: Norma Wyles, City Clerk
Department Head: Norma Wyles
DOC ID: 2026-214
Approval of the City Council meeting minutes for the meeting of June 16, 2026 and June 26, 2026.
CITY MANAGER'S RECOMMENDATION:
Approval of the City Council meeting minutes of June 16, 2026 and June 26, 2026.
FISCAL IMPACT:
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTOR'S LICENSE, REFERENCE CHECKS, INSURANCE, ETC.:
BACKGROUND:
DISCUSSION:
CONCLUSION:
ATTACHMENTS:
1. 6-16-2026 Regular Meeting CC Minutes
2. 6-26-2026 Special Meeting CC Minutes
Book 37
REGULAR MEETING
EL CENTRO CITY COUNCIL
COUNCIL CHAMBERS
1275 MAIN STREET, EL CENTRO, CA
TUESDAY, JUNE 16, 2026, 2:30 P.M.
OPEN SESSION
The El Centro City Council met in a regular meeting on Tuesday, June 16, 2026 at 2:35 p.m. in Conference Room A, El Centro City Hall, 1275 W. Main Street, El Centro, California for the purpose of closed session.
PRESENT: Council: Camarena, Crankshaw, Ellett, Marroquin City Clerk Wyles, City Manager Sawyer, City Attorney Hoff (Via Zoom) ABSENT: Carter
CLOSED SESSION PUBLIC COMMENT
None
CITY COUNCIL CLOSED SESSION
Moved by Camarena, second by Ellett, to adjourn into closed session for:
CONFERENCE WITH LABOR NEGOTIATORS
Pursuant to Government Code Section 54957.6
Agency Designated Representative: Robert Sawyer
Unrepresented Employees:
Human Resource Staff Assistant
Management Assistant
Human Resources Analyst (2)
City Clerk Staff Assistant
City Manager Staff Assistant
Human Resource Analyst II
Public Information Officer
Multimedia Content Creator
Battalion Chief (3)
Police Lieutenant (3)
Police Commander I
Economic Development Manager
Project Manager Civil
Principal Engineer
Information Technology Administrator
City Clerk
Chief of Fire
Director of Public Works
Assistant Director of Community Development
Director of Finance
Director of Human Resource
Director of Community Services
Director of Community Development
Book 37
Chief of Police
Director of Library
CONFERENCE WITH REAL PROPERTY NEGOTIATORS
Pursuant to Government Code Section 54956.8
Property:
Properties within El Centro, CA 92243 at the following addresses:
El Centro Regional Medical Center, 1415 Ross Ave.
ECRMC Medical Office Building, 1274 Ross Ave.
El Centro Outpatient Clinic, 385 W. Main St.
1204 Poplar Dr.
1258 Poplar Dr.
1295 Poplar Dr.
1455 Pepper Dr.
1215 Ross Ave.
1225 Ross Ave.
1243 Ross Ave.
1251 Ross Ave.
1271 Ross Ave.
135 S. 4th St.
Agency Negotiators: Sheppard Mullin (Eric Newsom, Megan Rooney, Christina Nguyen) Negotiating Parties: Imperial Valley Healthcare District (IVHD) Under Negotiation: Price and Terms of Payment
Motion carried.
Closed Session concluded at 5:40 p.m.
City Council recessed to 6:00 p.m.
OPEN SESSION
The El Centro City Council met in a regular meeting on Tuesday, June 16, 2026, at 6:05 p.m. in Council Chambers, El Centro City Hall, 1275 Main Street, El Centro, California.
PRESENT: Council: Camarena, Crankshaw, Ellett, Marroquin City Clerk Wyles, City Manager Sawyer, City Attorney Hoff (Via Zoom) ABSENT: Carter
Invocation was given by Council Member Ellett and Pledge of Allegiance to the flag of the United States of America was led by Council Member Marroquin.
CITY ATTORNEY REPORT ON CLOSED SESSION
No reportable action.
Book 37
PUBLIC COMMENT:
Public comment was received by Justin A. Thompson and Matt Dessert.
PRESENTATIONS AND ANNOUNCEMENTS BY MAYOR:
1. Certificate of Recognition – CUHS Spartan Choir & Spartan Guitar, Music in the Parks.
CONSENT AGENDA (2-5):
Moved by Marroquin, second by Ellett, approving consent items # 2-5.
2. Approval of Warrant Registers for the month of May 2026.
3. Approval of Payroll Registers for the month of May 2026.
4. Approval of Treasurer’s Report for the month of May 2026.
5. Approval of City Council meeting minutes for the meetings of May 19, 2026, and June 2, 2026.
AYES: Camarena, Crankshaw, Ellett, Marroquin
NOES: None
ABSENT: Carter
ABSTAINED: None
PUBLIC HEARINGS:
6. This was the scheduled date and time for a public hearing to approval of the Engineer’s Report regarding Buena Vista L&LD and the Levy and Collection of Assessments. Presentation by Elizabeth Fuchen, Finance Director.
Mayor Crankshaw opened the public hearing and invited anyone wishing to speak to come forward. Seeing no one come forward to make a comment, the public hearing was closed.
Motion by Marroquin, second by Camarena, adoption of Resolution No. 26-52, RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL CENTRO, APPROVING THE ENGINEER’S REPORT REGARDING BUENA VISTA LANDSCAPING AND LIGHTING DISTRICT; AND
AUTHORIZING THE LEVY AND COLLECTION OF ASSESSMENTS RELATED THERETO COMMENCING IN FISCAL YEAR 2026-2027.
AYES: Camarena, Crankshaw, Ellett, Marroquin
NOES: None
ABSENT: Carter
ABSTAINED: None
7. This was the scheduled date and time for a public hearing to approval of the Engineer’s Report regarding Legacy Ranch L&LD and the Levy and Collection of Assessments. Presentation by Elizabeth Fuchen, Finance Director.
Book 37
Mayor Crankshaw opened the public hearing and invited anyone wishing to speak to come forward. Seeing no one come forward to make a comment, the public hearing was closed.
Council member Marroquin commented that the subdivision of Legacy Ranch was pretty and asked why only 143 parcels were paying for the landscaping and lightning district. Ms. Fuchen explained that when the developer pulled the permits for construction, they did not decide to create a L&LD district for the first phase of the neighborhood, but they did create a district for the second district.
Council member Ellett asked for clarification, that the other homes are not included in the district and Ms.
Fuchen stated that the other homes not belonging to the L&LD are under the city’s maintenance. The city’s general fund pays for the city workers to clean the areas.
Motion by Marroquin, second by Crankshaw, adoption of Resolution No. 26-53, RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL CENTRO, APPROVING THE ENGINEER’S REPORT REGARDING LEGACY RANCH LANDSCAPING AND LIGHTING DISTRICT; AND
AUTHORIZING THE LEVY AND COLLECTION OF ASSESSMENTS RELATED THERETO COMMENCING IN FISCAL YEAR 2026-2027.
AYES: Camarena, Crankshaw, Ellett, Marroquin
NOES: None
ABSENT: Carter
ABSTAINED: None
8. This was the scheduled date and time for a public hearing to approval of the Engineer’s Report regarding Lotus Ranch L&LD and the Levy and Collection of Assessments. Presentation by Elizabeth Fuchen, Finance Director.
Mayor Crankshaw opened the public hearing and invited anyone wishing to speak to come forward.
Comment was received by Jessica Aceves. Seeing no one else come forward to make a comment, the public hearing was closed.
Motion by Marroquin, second by Camarena, adoption of Resolution No. 26-54, RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL CENTRO, APPROVING THE ENGINEER’S REPORT REGARDING LOTUS RANCH LANDSCAPING AND LIGHTING DISTRICT; AND
AUTHORIZING THE LEVY AND COLLECTION OF ASSESSMENTS RELATED THERETO COMMENCING IN FISCAL YEAR 2026-2027.
AYES: Camarena, Crankshaw, Ellett, Marroquin
NOES: None
ABSENT: Carter
ABSTAINED: None
9. This was the scheduled date and time for a public hearing to approval of the Engineer’s Report regarding Town Center L&LD and the Levy and Collection of Assessments. Presentation by Elizabeth Fuchen, Finance Director.
Mayor Crankshaw opened the public hearing and invited anyone wishing to speak to come forward. Seeing no one come forward to make a comment, the public hearing was closed.
Book 37
Motion by Marroquin, second by Camarena, adoption of Resolution No. 26-55, RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL CENTRO, APPROVING THE ENGINEER’S REPORT REGARDING EL CENTRO TOWN CENTER LANDSCAPING AND LIGHTING DISTRICT; AND
AUTHORIZING THE LEVY AND COLLECTION OF ASSESSMENTS RELATED THERETO COMMENCING IN FISCAL YEAR 2026-2027.
AYES: Camarena, Crankshaw, Ellett, Marroquin
NOES: None
ABSENT: Carter
ABSTAINED: None
NEW BUSINESS:
10. Presentation by Andy Heath, Finance Consultant, fiscal year 2026-2027 proposed budget.
Moved by Marroquin, second by Crankshaw, adopting Resolution No. 26-56, RESOLUTION OF THE
CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA ADOPTING THE ANNUAL BUDGET FOR FISCAL YEAR 2026-2027.
Public comment was received by Peter Rodriguez.
AYES: Camarena, Crankshaw, Ellett, Marroquin
NOES: None
ABSENT: Carter
ABSTAINED: None
11. Motion by Crankshaw, second by Camarena, adoption of Resolution No. 26-57, RESOLUTION OF
THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, CALLING FOR GENERAL MUNICIPAL ELECTION TO BE HELD ON TUESDAY, NOVEMBER 3, 2026, FOR THE ELECTION OF CERTAIN OFFICERS AS REQUIRED BY STATE LAW.
AYES: Camarena, Crankshaw, Ellett, Marroquin
NOES: None
ABSENT: Carter
ABSTAINED: None
12. Motion by Crankshaw, second by Marroquin, adoption of Resolution No. 26-58, RESOLUTION OF
THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, REQUESTING THE
BOARD OF SUPERVISORS OF THE COUNTY OF IMPERIAL TO CONSOLIDATE A GERENAL MUNICIPAL ELECTION TO BE HELD ON NOVEMBER 3, 2026, WITH THE STATEWIDE ELECTION PURSUANT TO CALIFORNIA CODE § 10403.
AYES: Camarena, Crankshaw, Ellett, Marroquin
NOES: None
ABSENT: Carter
ABSTAINED: None
Book 37
13. Presentation by Robert Sawyer, City Manager, placing a proposed one-half cent (0.50%) transactions and use (sales) tax measure on the November 2026 ballot.
Council members commented that the city needs this measure to pass in the coming election so the city can be fully staffed city needs are met.
Motion by Crankshaw, second by Marroquin, adoption of Resolution No. 26-59, RESOLUTION OF
THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, SUBMITTING TO THEN
ELECTORS A BALLOT MEASURE ESTABLISHING A NEW TRANSACTION AND USE TAX AT THE RATE OF 0.5%; ESTABLISHING POLICIES AND PROCEDURES OF SUCH ELECTION;
REQUESTING THAT THE IMPERIAL COUNTY BOARD OF SUPERVISORS CONSENT TO THE CONSOLIDATION OF SUCH BALLOT MEASURE ON THE BALLOT FOR THE CITY’S
GENERAL MUNICIPAL ELECTION WHICH IS CONSOLIDATED WITH THE STATEWIDE GENERAL ELECTION TO BE HELD ON TUESDAY, NOVEMBER 3, 2026; DIRECTING THE CITY ATTORNEY TO PREPARE THE IMPARTIAL ANALYSIS; AND PROVIDING FOR PRIMARY AND REBUTTAL ARGUMENTS.
AYES: Camarena, Crankshaw, Ellett, Marroquin
NOES: None
ABSENT: Carter
ABSTAINED: None
14. Motion by Marroquin, second by Ellett, adoption of Resolution No. 26-60, RESOLUTION OF THE
CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, AUTHORIZING SUBMISSION OF AN ACTIVE TRANSPORTATION PROGRAM CYCLE 8 GRANT APPLICATION AND COMMITTING LEBERAGED FUNDS FOR THE IMPERIAL AVENUE COMPLETE STREETS – SEGMENT C IMPROVEMENT PROJECT.
AYES: Camarena, Crankshaw, Ellett, Marroquin
NOES: None
ABSENT: Carter
ABSTAINED: None
15. Moved by Marroquin, second by Camarena, adoption of Resolution No. 26-61, RESOLUTION OF THE
CITY COUNCIL OF THE CITY OF EL CENTRO AWARDING THE BID AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR STPL-5169 (063) IMPERIAL AVENUE EXTENSION PHASE III FROM DANENBERG DRIVE TO MANUEL ORTIZ AVENUE.
AYES: Camarena, Crankshaw, Ellett, Marroquin
NOES: None
ABSENT: Carter
ABSTAINED: None
LEGISLATIVE ACTION:
None
INFORMATIONAL ITEMS:
16. Update Emergency Declaration – WWTP Bar Screen Failure
Book 37
TASK FORCE AND MAYOR & COUNCIL MEMBERS REPORTS
Council Members provided updates on their activities since the last City Council meeting and shared information on upcoming events.
CITY MANAGER REPORT
Reported on recent activities.
ADJOURNMENT
With no further business to come before City Council, the regular meeting adjourned at 9:10 p.m. ____________________________
Norma Wyles, City Clerk
APPROVED BY:
_________________________
Michael Crankshaw, Mayor
Book 37
SPECIAL MEETING
EL CENTRO CITY COUNCIL
CONFERENCE ROOM A
1275 W MAIN STREET, EL CENTRO, CA
FRIDAY, JUNE 26, 2026, 9:00 A.M.
OPEN SESSION
The El Centro City Council met in a special meeting on Friday, June 26, 2026 at 9:02 a.m. in Conference Room A, 1275 W Main Street, El Centro, CA 92243.
PRESENT: Council: Carter, Camarena, Crankshaw, Ellett, Marroquin City Clerk Wyles, City Manager Sawyer, City Attorney Hoff MOTION TO GO INTO CLOSED SESSION:
Moved by Ellett, second by Carter to go into closed session at 9:02 a.m.
CLOSED SESSION PUBLIC COMMENT:
No comments were received.
CITY COUNCIL CLOSED SESSION
CONFERENCE WITH REAL PROPERTY NEGOTIATORS:
Pursuant to Government Code Section 54956.8
Property:
Properties within El Centro, CA 92243 at the following addresses:
El Centro Regional Medical Center, 1415 Ross Ave.
ECRMC Medical Office Building, 1271 Ross Ave.
El Centro Outpatient Clinic, 385 W. Main St.
1204 Poplar Dr.
1258 Poplar Dr.
1295 Poplar Dr.
1455 Pepper Dr.
1215 Ross Ave.
1225 Ross Ave.
1243 Ross Ave.
1251 Ross Ave.
1271 Ross Ave.
135 South 4th St.
Agency Negotiators: Sheppard Mullin (Eric Newsom, Megan Rooney, Christina Nguyen) Negotiating Parties: Imperial Valley Healthcare District (IVHD) Under Negotiation: Price and Terms of Payment
CITY ATTORNEY REPORT ON CLOSED SESSION:
No reportable action.
Book 37
ADJOURNMENT
With no further business to come before City Council, the meeting adjourned at 10:20 a.m. ____________________________
Norma Wyles, City Clerk
APPROVED BY:
_________________________
Michael Crankshaw, Mayor
City Council of the City of El Centro
1275 W. Main Street
El Centro, CA 92243
SUBMITTED
ACTION ITEM (ID # 2026-204)
Item: 4.
Meeting: 7/7/2026 3:30 PM
Department: Finance
Category: Resolution
Prepared by: Elizabeth Fuchen,
Finance Director
Department Head: Elizabeth Fuchen
DOC ID: 2026-204
Adopt Resolution No. 26- , RESOLUTION OF THE CITY OF EL CENTRO,
CALIFORNIA AUTHORIZING THE LEVY OF A SPECIAL TAX IN COMMUNITY FACILITIES DISTRICT NO. 2007-1 (LEGACY RANCH) FOR FISCAL YEAR 2026/2027.
CITY MANAGER'S RECOMMENDATION:
Adopt Resolution No. 26- , RESOLUTION OF THE CITY OF EL CENTRO,
CALIFORNIA AUTHORIZING THE LEVY OF A SPECIAL TAX IN COMMUNITY FACILITIES DISTRICT NO. 2007-1 (LEGACY RANCH) FOR FISCAL YEAR 2026/2027.
FISCAL IMPACT:
The City will receive approximately $ 128,123.88 to pay the bond obligation debt and administration cost of El Centro Community Facilities District No. 2007-1 (Legacy Ranch) STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
Financial & Governance Stability & Sustainability
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTOR'S LICENSE, REFERENCE CHECKS, INSURANCE, ETC.:
BACKGROUND:
DISCUSSION:
On an annual basis, Community Facilities District No 2007-1 (Legacy Ranch) determines the levy and the collection of special taxes needed for the coming year. This collection is based on the schedule set out on Exhibit "A".
CONCLUSION:
Adopt Resolution No. 26- , RESOLUTION OF THE CITY OF EL CENTRO,
CALIFORNIA AUTHORIZING THE LEVY OF A SPECIAL TAX IN COMMUNITY FACILITIES DISTRICT NO. 2007-1 (LEGACY RANCH) FOR FISCAL YEAR 2026/2027.
ATTACHMENTS:
1. CFD 26-27
2. 00086487
3. Resolution No.26
INTEROFFICE
MEMORANDUM
TO: Elizabeth Fuchen, Finance Director
FROM: Joanna Hoff, City Attorney
RE: Resolution - Levy Special Tax Legacy Ranch No.2007-1 2026-2027
DATE: June 30, 2026
Legal Services Request No. A26-0123, received by this office on June 17, 2026, was reviewed and a recommended revised resolution is enclosed. Please note the following items:
1. This resolution appears to be pursuant to California Government Section 53340(b), which provides:
(b) The legislative body may provide, by resolution, for the levy of the special tax in the current tax year or future tax years at the same rate or at a lower rate than the rate provided by the ordinance, if the resolution is adopted and a certified list of all parcels subject to the special tax levy including the amount of the tax to be levied on each parcel for the applicable tax year, is filed by the clerk or other official designated by the legislative body with the county auditor on or before the 10th day of August of that tax year. The clerk or other official designated by the legislative body may file the certified list after the 10th of August but not later than the 21st of August if the clerk or other official obtains prior written consent of the county auditor.
Therefore, staff has until August 10 to provide the County Auditor the list of the parcels subject to the special tax and the amount of the tax to be levied on each parcel for fiscal year 2026-27.
If there is a different understanding of the requirements, please let me know.
2. This resolution needs to identify the specific Ordinance that established the District and authorized the amount of special taxes to be levied. I do not see the Ordinance in the City Code and it was not provided for my reference. Therefore, I could not provide this information. I highlighted where the Ordinance number needs to be inserted.
Other than this number, there are no further revisions required for the resolution.
Office of the El Centro
City Attorney
I am enclosing a clean version of the recommended resolution. A copy of the redline version of the resolution can be provided upon request.
If you have any questions, please let me know.
OFFICE OF THE CITY ATTORNEY
Joanna Hoff
City Attorney
JSH: cdz
06/2026/cdz/A26-0123/Reso/LevySpecialTaxLegacyRnch
RESOLUTION NO. 26-
RESOLUTION OF THE CITY OF EL CENTRO, CALIFORNIA,
AUTHORIZING THE LEVY OF A SPECIAL TAX IN
COMMUNITY FACILITES DISTRICT NO. 2007-1 (LEGACY
RANCH) FOR FISCAL YEAR 2026-2027
WHEREAS, the City Council of the City of El Centro (the “City Council”) established the Community Facilities District No. 2007-1 Legacy Ranch pursuant to the Mello-Roos Community Facilities Act of 1982, California Government Code Sections 53311 et seq. (the “District”); and
WHEREAS, the City Council, by Ordinance No.07-14, as authorized by California Government Code Section 53340, has authorized the levy of a special tax to pay for costs and expenses related to the District; and
WHEREAS, the City Council wants to establish the specific rate of the special tax to be collected for the District for the next fiscal year; and WHEREAS, pursuant to California Government Code Section 53340, the City Council may provide by resolution for the levy of the special tax for the next tax year at the same rate or at a lower rate than the rate provided by Ordinance No. 07-14.
NOW, THEREFORE, the City Council of the City of El Centro, California, does hereby resolve as follows:
1. The above recitals are true, correct and incorporated fully herein as findings.
2. The special tax rates for each tax category to be used to generate special tax revenues, which will be collected to pay for the costs and expenses for the next fiscal year (2026-2027) for the District, is hereby determined and established as set forth in the attached, referenced and incorporated Exhibit “A.”
3. The rate as set forth above does not exceed the amount as previously authorized by Ordinance No. 07-14 of the City Council, and is not in excess of that as previously approved by the qualified electors of the District.
4. The City Clerk or other designated official shall file a certified list of all parcels subject to the special tax with the County Auditor on or before July 15, 2026. The special tax shall be collected in the same manner as ordinary ad valorem property taxes are collected, and shall be subject to the same penalties and same procedure and sale in cases of any delinquency for ad valorem taxes, and the Tax Collector is hereby authorized to deduct reasonable administrative costs incurred in collecting any said special tax revenues.
5. Special tax revenues collected pursuant to this Resolution shall be paid to the City and deposited into the District account.
6. The Auditor of the County of Imperial is hereby directed to enter in the next County assessment roll on which taxes will become due, opposite each lot or
06/2026/cdz/A26-0123/Reso/LevySpecialTaxLegacyRnch
parcel of land effected in a space marked “public improvements, special tax” or by any other suitable designation, the installment of the special tax, and for the exact rate and amount of said tax, reference is made to the attached Exhibit “A.”
7. The County Auditor shall then, at the close of the tax collection period, promptly render to the City Council a detailed report showing the amount and/or amounts of such special taxes, interest, penalties and percentages collected and from what property collected, and also provide a statement of any percentage of the special taxes retained for the expense of making the collections and the report.
PASSED AND ADOPTED by the City Council of the City of El Centro, California this day of , 2026 by the following vote:
CITY OF EL CENTRO
By ___________________________
Michael Crankshaw, Mayor
ATTEST:
By ________________________
Norma Wyles, City Clerk
APPROVED AS TO FORM:
Office of the City Attorney
By ________________________
Joanna Hoff, City Attorney
STATE OF CALIFORNIA )
COUNTY OF IMPERIAL ) ss
CITY OF EL CENTRO )
I, Norma Wyles, City Clerk of the City of El Centro, California, do hereby certify that the foregoing Resolution No. 26- was duly and regularly adopted at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
By ___________________________
Norma Wyles, City Clerk
06/2026/cdz/A26-0123/Reso/LevySpecialTaxLegacyRnch
Exhibit “A”
Community Facilities District No. 2007-1
(Legacy Ranch)
Proposed Special Tax Rates
Fiscal Year 2026/2027
The following table summarizes the Maximum and the Proposed Special Tax Rates relating to each land use class.
LAND USE
CLASS
SPECIAL TAX RATE
(MULTIPLIER)
RESIDENTIAL FLOOD
AREA (SQ FT)
FY 2026/2027
MAXIMUM SPECIAL
TAX RATE
FY 2026/2027
PROPOSED SPECIAL
TAX RATE (1)
1 Per square foot of
Residential Floor Area Greater than 3,176 $1,322.78 /unit $1,322.78 /unit 2 Per square foot of
Residential Floor Area 2,926-3,175 $1,235.37 /unit $1,235.37 /unit 3 Per square foot of
Residential Floor Area 2,676-2,925 $1,111.54 /unit $1,111.54 /unit 4 Per square foot of
Residential Floor Area 2,426-2,675 $1,009.57 /unit $1,009.57 /unit 5 Per square foot of
Residential Floor Area 2,176-2,425 $926.53 /unit $926.53 /unit 6 Per square foot of
Residential Floor Area Less than 2,175 $826.01 /unit $826.01 /unit (1)The Proposed Special Tax Rates to be levied for Fiscal Year 2026/2027 will not exceed the Maximum Special Tax Rates described above.
City Council of the City of El Centro
1275 W. Main Street
El Centro, CA 92243
SUBMITTED
ACTION ITEM (ID # 2026-162)
Item: 5.
Meeting: 7/7/2026 3:30 PM
Department: Community Development
Category: Ordinance
Prepared by: Angel Hernandez,
Community Development Director
Department Head: Angel Hernandez
DOC ID: 2026-162
Discussion and any necessary action regarding amending Chapter 4, Article III of the City Municipal Code regarding wagering limits for cardrooms.
CITY MANAGER'S RECOMMENDATION:
The City Council is to consider the information presented in this report and take such action as the Council determines to be appropriate. If the Council determines to approve the proposal as presented, it may move to:
Introduce Ordinance No. 26- , AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, AMENDING CHAPTER 4, ARTICLE III “POOLROOMS, BOWLING ALLEYS AND CARD, ETC., ROOMS” OF THE EL CENTRO MUNICIPAL CODE, waive reading and approve as first reading and authorized City Clerk to place on the next agenda for second reading and adoption.
FISCAL IMPACT:
Not Applicable
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
Economic Opportunity
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTOR'S LICENSE, REFERENCE CHECKS, INSURANCE, ETC.:
Not Applicable
BACKGROUND:
The El Centro Municipal Code regulates the operation and approval of up to one cardroom in the City (Chapter 4, Article III). The “Cardroom Ordinance” was first adopted in 1999 and last amended in 2024 via Ordinance 2024-05. The most substantive changes from the 2024 amendment established hours of operation, allowed the consumption of alcoholic beverages in the cardroom, which was previously prohibited, and increased the maximum number of tables from three to five. These changes were made at the request of Casino Azul, LLC, the successor in interest to the State Cardroom License previously held by Tommy’s Casino and Saloon.
DISCUSSION:
Casino Azul, LLC is now requesting that the City Council consider removing the wagering limit in the ordinance, which has been in place since it was first established in 1999. The current wagering limit is $249.00 per hand. Changes to the City’s Cardroom Ordinance are also subject to review by the California Department of Justice – Bureau of Gambling Control for compliance with state law and regulations. Staff prepared a draft ordinance removing the restriction and provided it to the Bureau for comment. On February 6, 2026, the Bureau provided a letter stating that it found the proposed changes in compliance with
state law.
CONCLUSION:
The City Council is to consider the information presented in this report and take such action as the Council determines to be appropriate. If the Council determines to approve the proposal as presented, it may move to:
Introduce Ordinance No. 26- , AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, AMENDING CHAPTER 4, ARTICLE III “POOLROOMS, BOWLING ALLEYS AND CARD, ETC., ROOMS” OF THE EL CENTRO MUNICIPAL CODE, waive reading and approve as first reading and authorized City Clerk to place on the next agenda for second reading and adoption.
ATTACHMENTS:
1. Exhbit A - Ordinance
03/2026/A26-0061/Ord/CardroomWagerLimitAmendmt 1
ORDINANCE NO. 26-__
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, AMENDING CHAPTER 4, ARTICLE III “POOLROOMS, BOWLING ALLEYS AND CARD, ETC., ROOMS” OF THE EL CENTRO MUNICIPAL CODE The City Council of the City of El Centro finds as follows:
1. Chapter 4, Article III, Division 2 of the City of El Centro Municipal Code contains regulations on the license and operation of up to one cardroom and was last amended in 1999 by Ordinance 99-9.
2. Tommy’s Casino and Saloon located at 459 Main St., operated as the only licensed cardroom in the city and ceased operations in 2018.
3. State law continues to allow cardrooms with certain conditions when permitted by local ordinance.
4. The City Council has determined to continue cardrooms within the City and update Chapter 4, Article III, Division 2 of the City Code to allow a new cardroom operation within the City.
THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS:
Section 1. Incorporation.
Chapter 4, Article III, Division 2, Section 4-76.14(a) is amended in its entirety to read as follows:
There shall be no limit on the amount permitted in a single bet or wager, or in the maximum amount permitted to be wagered in any game. A cardroom owner may impose bet or wagering limits on any game, at the owner’s discretion, but only to the extent that the bet or wagering limits comply with the game rules approved by the California Department of Justice Bureau of Gambling Control. All bet or wagering limits shall be clearly posted for each game.
Section 2. Severability.
If any section, subsection, sentence, clause, phrase, or word of this Chapter, or any application thereof to any person or circumstance, is held to be invalid or unconstitutional by a decision of a court of competent jurisdiction, such decision shall not affect the validity of the remaining portions or applications of this ordinance. The City Council hereby declares that it would have passed this ordinance and each and every section, subsection, sentence, clause, phrase, and word not declared invalid or unconstitutional without regard to whether any other portion of this Chapter or application thereof would be subsequently declared invalid or unconstitutional.
03/2026/A26-0061/Ord/CardroomWagerLimitAmendmt 2
Section 3. Publication.
This ordinance shall take effect thirty (30) calendar days after the date of its passage. Before the expiration of fifteen (15) days after its passage, this ordinance or a summary thereof shall be published in a newspaper of general circulation published and circulated within the City along with the names of the members of the City Council voting for and against same.
INTRODUCED at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2026.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2026.
CITY OF EL CENTRO
By______________________________
Michael Crankshaw, Mayor
ATTEST:
By _________________________
Norma Wyles, City Clerk
APPROVED AS TO FORM:
Office of the City Attorney
By _________________________________
Joanna Hoff, City Attorney
STATE OF CALIFORNIA )
COUNTY OF IMPERIAL ) ss
CITY OF EL CENTRO )
I, Norma Wyles, City Clerk of the City of El Centro, California, do hereby certify that the foregoing Ordinance No. 26-__ was duly and regularly adopted at a special meeting of the City Council of the City of El Centro, California, held on the __th day of July, 2026, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
03/2026/A26-0061/Ord/CardroomWagerLimitAmendmt 3
AYES:
NOES:
ABSENT:
ABSTAINED:
By
Norma Wyles, City Clerk
City Council of the City of El Centro
1275 W. Main Street
El Centro, CA 92243
SUBMITTED
ACTION ITEM (ID # 2026-197)
Item: 6.
Meeting: 7/7/2026 3:30 PM
Department: Police
Category: Presentation
Prepared by: Rene McNish ,
Commander
Department Head: Kelly Brown
DOC ID: 2026-197
El Centro Police Department's Commemorative 250th Anniversary Badge Program.
CITY MANAGER'S RECOMMENDATION:
Approve the El Centro Police Department's Commemorative 250th Anniversary Badge Program in recognition of the United States Semi-quincentennial Celebration and authorize sworn personnel to wear the commemorative badge from July 4, 2026, through December 31, 2026.
FISCAL IMPACT:
There is no fiscal impact to the City of El Centro General Fund or any other public funding source. The commemorative badges were acquired through asset forfeiture funding. No City funds, grant funds, or taxpayer resources were utilized for the design, purchase, or production of the commemorative badges.
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
Community Health, Safety & Welfare
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTOR'S LICENSE, REFERENCE CHECKS, INSURANCE, ETC.:
BACKGROUND:
On July 4, 2026, the United States will commemorate the 250th Anniversary of the signing of the Declaration of Independence, marking a historic milestone in our nation's history.
Communities across the country are recognizing this occasion through events, educational programs, and commemorative initiatives that honor the principles of freedom, service, and civic responsibility upon which the nation was founded.
The El Centro Police Department has a longstanding tradition of honoring significant historical events and demonstrating its commitment to public service through community engagement initiatives. To commemorate the nation's 250th birthday, the Department has designed a special commemorative badge that reflects the Department's dedication to the United States, the residents of El Centro, and the law enforcement profession.
The commemorative badges were obtained through asset forfeiture funds, ensuring that no public funds were expended for this initiative. The badge is intended to serve as a visible symbol of the Department's commitment to safeguarding the constitutional principles and freedoms that have guided the nation for 250 years.
DISCUSSION:
The commemorative badge will be presented publicly to the City Council and the community as part of the City's recognition of the nation's 250th Anniversary celebration.
Upon approval, sworn personnel will be authorized to wear the commemorative badge while on duty beginning July 4, 2026, and continuing through December 31, 2026.
This initiative provides an opportunity to foster community engagement, celebrate national heritage, and recognize the important role that law enforcement plays in preserving public safety and protecting the rights and liberties of all residents. The commemorative badge program was accomplished without the expenditure of City funds, reflecting the Department's commitment to responsible stewardship of public resources while participating in this historic national observance.
The commemorative badge will not alter the Department's authority, policies, procedures, or operational practices. It is intended solely as a symbolic and ceremonial recognition of this historic national milestone.
CONCLUSION:
APPROVE THE EL CENTRO POLICE DEPARTMENT'S COMMEMORATIVE 250TH
ANNIVERSARY BADGE PROGRAM IN RECOGNITION OF THE UNITED STATES
SEMIQUINCENTENNIAL CELEBRATION AND AUTHORIZE SWORN PERSONNEL TO WEAR THE COMMEMORATIVE BADGE FROM JULY 4, 2026, THROUGH DECEMBER 31, 2026.
ATTACHMENTS:
None
City Council of the City of El Centro
1275 W. Main Street
El Centro, CA 92243
SUBMITTED
ACTION ITEM (ID # 2026-199)
Item: 7.
Meeting: 7/7/2026 3:30 PM
Department: Public Works
Category: Action Item
Prepared by: Luis Alonzo, Assistant
Engineer
Department Head: Abraham Campos
DOC ID: 2026-199
Approval of Plans and Specifications and Authorization to Bid for Gillett Road Rehabilitation Project LPPSB1L-5169(064)
CITY MANAGER'S RECOMMENDATION:
Approve the Plans and Specifications for the Gillett Road Rehabilitation Project LPPSB1L5169(064) and authorize staff to release for public bidding.
FISCAL IMPACT:
No Impact to the General Fund.
Project is 50 percent State grant funded, with the remainder 50 percent in local Measure D funds.
Total estimated costs are as follows:
Purpose State Match Local Measure D
Match
Total
Construction $231,000 $231,000 $462,000
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
Environmental Sustainability & Infrastructure
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTOR'S LICENSE, REFERENCE CHECKS, INSURANCE, ETC.:
N/A
BACKGROUND:
Engineering staff applied for SB1 Local Partnership Program (LPP) State Funding and the City was granted $231,000 in SB1LPP funding towards road improvements on Gillette Avenue from Main Street to Cooley Road.
DISCUSSION:
The City of El Centro received an allocation of $231,000 in SB 1 Local Partnership Program funding for road improvements on Gillett Road between Earls Street and Cooley Road. Improvements will include cold milling and asphalt overlay of the existing roadway surface.
The City Council previously approved the Program Supplemental Agreement per Resolution No. 26-45 at the May 5, 2026 City Council Meeting. Engineering Staff has completed the project design and prepared the plans and specifications for the Gillett Road Rehabilitation Project, and recommends their approval to authorize the bidding process.
Below is a tentative schedule for this project:
Approval of Plans and Specs - July 7, 2026
Advertise Project - July 17, 2026
Pre-Bid Meeting - July 29, 2026
Bid Opening - August 20, 2026
Construction Award - September 21, 2026
Construction Commence - October 19, 2026
Construction Complete - December 18, 2026
CONCLUSION:
Approve the Plans and Specifications for the Gillett Road Rehabilitation Project LPPSB1L5169(064) and authorize staff to release for public bidding.
ATTACHMENTS:
1. Specifications Complete
2. Final Plans
Exhibit A
GILLET RD. REHABILITATION PROJECT
LPPSB1L-5169 (064)
TABLE OF CONTENTS
PAGE
VOLUME 1 OF 2
NOTICE INVITING SEALED PROPOSALS (BIDS) NIB 1 - 6
BIDDING DOCUMENTS BD 1 - 21
CONTRACT DOCUMENTS CD 1 - 36
Agreement
Performance Bond
Payment Bond
Public Contract Code Section 22300
Public Contract Code Section 9204
GENERAL CONDITIONS GC 1 - 66
SUPPLEMENTAL GENERAL CONDITIONS SGC 1 - 2
SPECIFICATIONS S 1
VOLUME 2 OF 2
SPECIAL PROVISIONS SP 1 – 24
Exhibit A
06/2026/A26-0119/BidDocs
NIB 1
NOTICE INVITING BIDS
PROJECT TITLE: GILLET RD. REHABILITATION PROJECT LPPSB1L-5169 (064) RECEIPT OF BIDS: The City of El Centro (“City” or “OWNER”) will accept sealed Bids for the Gillet Rd. Rehabilitation Project LLPPSB1L-5169 (064) (“Project”) at the office of the City Clerk located at 1275 Main Street, El Centro, CA 92243, until 2:00 p.m. on , 2026.
DESCRIPTION OF WORK: The WORK includes but is not limited to:
Furnishing all labor, materials, equipment, and other incidental and appurtenant work necessary to complete the grinding of existing asphalt concrete pavement, installation of asphalt-rubber and aggregate membrane, installation of gap graded (GG) asphalt-rubber hot mix, installation of conventional asphalt concrete, installation of curb and gutter, utility cover adjustments, monument preservation and traffic control.
SITE OF WORK: The site of the WORK is located within the City of El Centro at Gillet Rd.
COMPLETION OF WORK: The WORK must be completed within sixty (60) calendar days after the commencement date stated in the Notice to Proceed.
OPENING OF BIDS: The Bids will be publicly opened and read at 2:01 pm on , 2026, at the office of the City Clerk located at 1275 Main Street, El Centro, CA 92243.
OBTAINING CONTRACT DOCUMENTS: The Contract Documents are entitled “GILLET RD. REHABILITATION PROJECT LPPSB1L-5169 (064)”
The Contract Documents are available through Planet Bids, by accessing our website (www.cityofelcentro.org) and selecting “GOVERNMENT> PUBLIC WORKS> BIDS & PROPOSALS> PROCEED TO SITE”from the drop down menu or by visiting https://pbsystem.planetbids.com/portal/41180/portal-home MANDATORY PRE-BID CONFERENCE: Bidders are required to attend a pre-bid meeting, which will be conducted by City’s CONSTRUCTION MANAGER at 10:00 A.M. on , 2026.
The meeting will be held at the City of El Centro, Conference Room located at , El Centro, CA 92243. The object of the meeting is to acquaint Bidders with the site conditions and mandatory bidding requirements and subcontractors of subcontracting and material supply opportunities. At that meeting, City’s Equal Opportunity Program goals and reporting procedures will be discussed.
Exhibit A
06/2026/A26-0119/BidDocs
NIB 2
QUESTIONS: Technical questions should be directed to the CONSTRUCTION MANAGER through the Planet Bids portal. Should the Planet Bids portal be unavailable, questions should then be directed to the OWNER at
Questions must arrive at least ten (10) days prior to the bid opening to allow time for distributing answers and/or clarifications to plan holders.
CITY’S RESPONSES: Responses to questions that may be asked will be provided by written Addenda through the Panet Bids portal. All such Addenda shall become part of the Contract Documents and all bidders shall be bound by such Addenda. No oral comments shall be of any force or effect with respect to this solicitation.
REQUIRED DOCUMENTS AT BID TIME:
The bid shall be considered incomplete and be disqualified if any of the required BIDDING DOCUMENTS in pages BD9 to BD21 of this solicitation are not provided as instructed.
BID SECURITY: Each Bid shall be accompanied by a certified or cashier’s check or bid bond in the amount of ten (10) percent of the total Bid price payable to the City of El Centro as a guarantee that the Bidder, if its bid is accepted, will promptly execute the Agreement. A bid shall not be considered unless one of the forms of bid security is enclosed with it.
BIDS TO REMAIN OPEN: The Bidder shall guarantee the total Bid price for a period of ninety (90) Days from the date of Bid opening.
CONTRACTOR’S LICENSE CLASSIFICATION: In accordance with the provisions of California Law, OWNER has determined that CONTRACTOR shall possess a valid Class A California contractor’s license at the time that the Bid is submitted. Failure to possess the specified license shall render the Bid non-responsive and shall act as a bar to award of the Agreement to any Bidder not possessing said license at the time of Bid.
CALIFORNIA WAGE RATE REQUIREMENTS: In accordance with the provisions of California Labor Code sections 1770 et seq. as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in such sections for the locality in which the WORK is to be performed.
A copy of said wage rates is on file at the office of OWNER. It shall be mandatory for CONTRACTOR to whom the WORK is awarded, and upon any Subcontractor under CONTRACTOR, to pay not less than said specified rates to all workers employed by them in the execution of the WORK.
CONTRACTOR AND SUBCONTRACTOR REGISTRATION WITH DEPARTMENT OF INDUSTRIAL RELATIONS:
Exhibit A
06/2026/A26-0119/BidDocs
NIB 3
Labor Code section 1771.1 provides that a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Public Contract Code section 4104, or engage in the performance of any contract for public work, as that term is defined in Chapter 1, Part 7, Division 2 of the Labor Code, unless currently registered and qualified to perform public work pursuant to Labor Code section 1725.5. Labor Code section 1771.1 also provides that it is not a violation of that section for an unregistered contractor to submit a bid that is authorized by Business and Professions Code section 7029.1 or by Public Contract Code section 10164, provided the contractor is registered to perform public work pursuant to Labor Code section 1725.5 at the time the contract is awarded.
This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
RETENTION FROM PAYMENTS: CONTRACTOR may elect to receive one hundred (100) percent of payments due under the Contract Documents from time to time, without retention of any portion of the payment by OWNER, by depositing securities of equivalent value with OWNER in accordance with the provisions of section 22300 of the Public Contract Code. Such securities, if deposited by CONTRACTOR, shall be valued by OWNER, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit or any other security mutually agreed to by CONTRACTOR and OWNER.
FILING OF BID PROTESTS: By submitting a Bid, each Bidder hereby agrees and understands that the Bidder must comply with these protest procedures and exhaust all administrative remedies set forth herein prior to the initiation of any type of related legal action. With the express written Contract of the City and Bidder, and subject to the requirements of applicable law, this protest procedure can also be used to resolve issues surrounding the City’s determination of a Bidder as not responsible. The following terms as used in this Section shall have the following meanings:
“Protest” shall mean a written objection by an interested party or affected party to (i) the requirements or specifications contained in the Notice to Bidders or any portion of documents accompanying that notice; or (ii) a proposed award recommendation protest.
A. Solicitation Phase Protest. The purpose of the solicitation is to obtain competitive Bids from Bidders. Any Bidder who has submitted a bid and who believes that a free and open competition has not taken place or that a particular specification or requirement is impractical, unduly restrictive, or ambiguous may advise the City of its concerns by submitting a detailed Solicitation Protest Statement in accordance with the requirements set forth below in this Section A. The Protest does not replace the requirement to report irregularities in the bid documents.
Exhibit A
06/2026/A26-0119/BidDocs
NIB 4
(1) Contents and Requirements
A solicitation protest must be submitted to the contact named in the bid documents by personal delivery or email by close of business at least fifteen (15) calendar days prior to the Bid due date, and must contain all of the following to be considered:
a. The name, address, and telephone number of the protester; and b. The Project Name and Project Number; and
c. A detailed statement setting forth the grounds for protest, which shall include all the factual and legal documentation in support of the protest in sufficient detail to establish merits of the protest; and d. The desired resolution of the protest.
If the submitted protest does not comply with the requirements set forth herein, then it will not be considered for evaluation and will be returned to the protestor. Any grounds for protest not raised are waived. The protest may not be amended after filing. The protest is a public document.
(2) Evaluation and Determination
No hearing will be held on the protest. City’s Public Works Director, or designee, will review the protest and any supporting material and conduct an investigation of the facts. He/she may, but need not, requires other Bidders to submit statements or arguments regarding the protest and may discuss the protest with the protestor.
The Public Works Director or designee shall issue a final written decision regarding any solicitation protest to each Bidder prior to Bid opening. The written decision will cite any actions that will or will not be taken in response to the protest. That decision shall be final, and there shall be no further administrative recourse.
B. Protest of Award
(1) Contents and Requirements
Following the opening of the Bids any unsuccessful Bidder, may protest City’s proposed award of the Contract by submitting a protest to the Public Works Director or designee no later than close of business on the fifth business day. That protest must be submitted in a timely manner, signed by the protesting Bidder, must contain all of the following to be considered:
a. The name, address, and telephone number of the protestor; and b. The Project Name and Project Number; and
c. The City action or recommendation that is being protested;
Exhibit A
06/2026/A26-0119/BidDocs
NIB 5
d. A detailed statement setting forth every ground, reason, legal authority and facts in support of the protest, including all documents and evidence including specific references to parts of the bid documents; and e. A clear statement of the relief request
A protest that does not comply with the requirements set forth herein will be returned to the protestor. The protest shall not be amended after filing. Any grounds for protest not raised are waived. The protest is a public document.
Award Protest Statements are public documents. City will notify the affected parties when a protest has been submitted, and will provide copies of the protest to the affected parties as soon as is reasonably practical. (2) Evaluation and Determination
The affected parties may file responsive statements in support of or in opposition to the protest within three (3) business days after the receipt of the protest from the City. The Public Works Director, or designee, shall review the facts and all submittals relative to the protest and shall issue a written decision setting forth the basis for such decision. The written decision will be issued to the protestor and to all affected parties.
Unless otherwise required by law, no hearing shall be provided. In the event a hearing is conducted, the Public Works Director or designee, shall issue written notice to the protestor and affected parties identifying the date and time for the hearing, along with rules concerning the hearing.
C. Delay in Award
Execution of any proposed contract shall be delayed pending the resolution of the protest unless one or more of the following conditions is present:
1. The items or services being procured are urgently required;
2. Delivery or performance will be unduly delayed by failure to make award promptly; or
3. Failure to make prompt award will otherwise cause undue harm to the City.
D. No Limitations on Remedies
Nothing contained herein shall be construed to act as a limitation of the City’s choice of remedies or confer any right upon any interested party or affected party to a remedy.
E. Basis for Choice Remedy
Exhibit A
06/2026/A26-0119/BidDocs
NIB 6
In determining the appropriate remedy, the City shall consider all of the circumstances surrounding the notice of bids and/or award, including, but not limited to:
1. The seriousness of any deficiency found to exist in the contracting process;
2. The effect of the action on the competitive process;
3. Any urgency surrounding the requirement to enter into a contract; and
4. The effect that implementing the remedy will have on the City.
F. Remedies
If the City determines that the award or proposed award was not made in accordance with applicable statues, regulations, policies and/or procedures, the City, in its sole discretion, may grant any of the following remedies or any other remedy it deems appropriate:
1. Prior to award, City may issue a new solicitation, make a new selection/award recommendation, or award the contract consistent with applicable statutes, regulations, policies and procedures;
2. In its sole discretion, take no further action; or
3. Take any other action that is permitted by law to promote compliance.
OWNER’S RIGHTS RESERVED: OWNER reserves the right to reject any or all Bids, to waive any informality in a Bid, and to make awards to the lowest responsive Bidder as it may best serve the interest of OWNER.
Date:____________________ OWNER: City of El Centro
_________________________
Norma Wyles, City Clerk
- END OF NOTICE INVITING BIDS -
Exhibit A
07/14\CA – Bid Template
City of El Centro
Project Name
06/2026/A26-0119/BidDocs
BD-1
BIDDING DOCUMENTS
Exhibit A
BD-2
06/2026/A26-0119/BidDocs
INSTRUCTIONS TO BIDDERS
1. DEFINED TERMS. Terms used in these Instructions to Bidders and the Notice Inviting Bids which are defined in the General Conditions have the meanings assigned to them in the General Conditions. The term “Bidder” means one who submits a Bid directly to OWNER, as distinct from a sub-bidder, who submits a Bid to a Bidder.
2. INTERPRETATIONS AND ADDENDA.
2.1 All questions about the meaning or intent of the Contract Documents are to be directed to OWNER. Interpretations or clarifications considered necessary by OWNER in response to such questions will be issued by Addenda. Questions received less than ten (10) Days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
2.2 Addenda may also be issued to modify the Contract Documents as deemed advisable by OWNER or DESIGN CONSULTANT.
3. COMPETENCY OF BIDDERS. In selecting the lowest responsive Bidder, consideration will be given not only to the financial standing but also to the general competency of the Bidder for the performance of the WORK covered by the Bid. To this end, OWNER has determined that all Bidders must be pre-qualified. Bidders must possess a valid California contractor’s license applicable to the type of work bid upon at the time of opening Bids.
4. EL CENTRO BUSINESS LICENSE. All Bidders and their Subcontractors not already having a business license from the City of El Centro will be required to secure the appropriate license from the City of El Centro before the Agreement can be executed.
5. DISQUALIFICATION OF BIDDERS. More than one (1) Bid from an individual, firm, partnership, corporation or association under the same or different names will not be considered. If OWNER believes that any Bidder is interested in more than one (1) Bid for the WORK contemplated, all Bids in which such Bidder is interested will be rejected. If OWNER believes that collusion exists among the Bidders, all Bids will be rejected. A party who has quoted prices to a Bidder is not hereby disqualified from quoting prices to other Bidders, or from submitting a Bid directly for the WORK.
6. BIDDER’S EXAMINATION OF CONTRACT DOCUMENTS AND SITE
6.1 It is the responsibility of each Bidder before submitting a Bid:
(a) To examine thoroughly the Contract Documents and other related data identified in the Bidding Documents (including “technical data” referred to below); (b) To visit the site to become familiar with and satisfy Bidder as to the general and local conditions that may affect cost, progress or performance of the WORK; (c) To consider Federal, State and local Laws and Regulations that may affect cost, progress or performance of the WORK;
Exhibit A
BD-3
06/2026/A26-0119/BidDocs
(d) To study and carefully correlate the Bidder’s knowledge and observations with the Contract Documents and other related data; and
(e) To notify CONSTRUCTION MANAGER of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related data.
6.2 Reference is made to the Supplementary General Conditions for identification of:
(a) Those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by DESIGN CONSULTANT in the preparation of the Contract Documents. The Bidder may rely upon the accuracy of the technical data contained in such reports, however, the interpretation of such technical data, including any interpolation or extrapolation thereof, together with non-technical data, interpretations and opinions contained therein or the completeness thereof is the responsibility of the Bidder. (b) Those drawings of physical conditions in or relating to existing surface and subsurface conditions (except Underground Utilities) which are at or contiguous to the site that have been utilized by DESIGN CONSULTANT in the preparation of the Contract Documents. The Bidder may rely upon the accuracy of the technical data contained in such drawings, however, the interpretation of such technical data, including any interpolation or extrapolation thereof, together with nontechnical data, interpretations and opinions contained in such drawings or the completeness thereof is the responsibility of the Bidder.
Subsurface conditions, including but not limited to groundwater, may have changed significantly between the completion of the soils investigation by the geotechnical engineer and start of construction. Subsurface conditions, including but not limited to groundwater, may change significantly during construction.
6.3 Copies of such reports and drawings will be made available by OWNER to any Bidder on request if said reports and drawings are not bound herein. Those reports and drawings are not part of the Contract Documents, but the technical data contained therein upon which the Bidder is entitled to rely, in Paragraph SGC-4.2 of the Supplementary General Conditions has been identified and established.
6.4 Information and data reflected in the Contract Documents with respect to Underground Utilities at or contiguous to the site is based upon information and data furnished to OWNER and DESIGN CONSULTANT by the owners of such Underground Utilities or others, and OWNER does not assume responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the Supplementary General Conditions or the section entitled “Protection and Restoration of Existing Facilities” of the General Requirements.
Exhibit A
BD-4
06/2026/A26-0119/BidDocs
6.5 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders on subsurface conditions, Underground Utilities and other physical conditions, and possible changes in the Contract Documents due to differing conditions appear in Paragraphs 4.2, 4.3, and 4.4 of the General Conditions.
6.6 Before submitting a Bid, each Bidder will, at Bidder’s own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and Underground Utilities) at or contiguous to the site or otherwise which may affect cost, progress or performance of the WORK or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Bidder and Safety precautions and programs incident thereto which the Bidder deems necessary to determine its Bid for performing the WORK in accordance with the time, price and other terms and conditions of the Contract Documents. Interference with existing facility operations will not be permitted.
6.7 On request in advance, OWNER will provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and shall clean up and restore the site to its former condition upon completion of such examinations, investigations, explorations, tests and studies.
6.8 The lands upon which the WORK is to be performed, rights-of-way and easements for access thereto and other lands designated for use by CONTRACTOR in performing the WORK are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by CONTRACTOR. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by OWNER unless otherwise provided in the Contract Documents.
6.9 The submission of a Bid will constitute an incontrovertible representation by the Bidder that the Bidder has complied with every requirement of this Paragraph 6, “Bidder’s Examination of Contract Documents and Site” herein, that without exception the Bid is premised upon performing the WORK required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction (if any) as may be indicated in or required by the Contract Documents, that Bidder has given CONSTRUCTION MANAGER written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolution thereof by CONSTRUCTION MANAGER is acceptable to Bidder and the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of the WORK.
Exhibit A
BD-5
06/2026/A26-0119/BidDocs
7. BID FORM.
7.1 The Bid shall be made on the Bid schedule bound herein and the pages may be removed from the bound volume. The envelope enclosing the sealed Bids shall be plainly marked in the upper left-hand corner with the name and address of the Bidder and shall bear the words “BID FOR” followed by “PROJECT NAME,” El Centro, CA, 92243, and the date and hour of opening of Bids. The Bid security shall be enclosed in the same envelope with the Bid.
7.2 All blanks on the Bid form must be completed in ink.
7.3 Bids by corporations must be executed in the corporate name by the president and a vice-president. Bids signed by other corporate officer or the project manager shall be (be accompanied by the enclosed certificate of authority to sign, attested by the secretary or assistant secretary, and with the corporate seal affixed. The corporate address and state of incorporation must appear below the signature.
7.4 Bids by partnerships must be executed in the partnership name and be signed by a managing partner, accompanied by evidence of authority to sign and his/her title must appear under the signature and the official address of the partnership must appear below the signature.
7.5 All names must be printed below the signature.
7.6 The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid form. Failure to acknowledge Addenda shall render the Bid non-responsive and shall be cause for its rejection.
7.7 The address to which communications regarding the Bid are to be directed must be shown.
7.8 All Bidders must provide evidence of authority to conduct business in California to the extent required by law.
Exhibit A
BD-6
06/2026/A26-0119/BidDocs
8. QUANTITIES OF WORK. The quantities of work or material stated in unit price items of the Schedule of Values are supplied only to give an indication of the general scope of the WORK; OWNER does not expressly or by implication agree that the actual amount of work or material will correspond therewith, and reserves the right after award to increase or decrease the amount of any unit price item of the WORK in accordance with Article 10 of the General Conditions, to delete any Bid item in its entirety, or to add additional Bid items up to and including an aggregate total amount not to exceed twenty-five (25) percent of the Contract Price.
9. SUBSTITUTE OR “OR EQUAL” ITEMS. Whenever materials or equipment are specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular supplier and the name is followed by the words “or equal,” the Bidder may write the name of a substitute supplier (which the Bidder considers as an “or equal”) in the Proposed Substitute Equipment/Material Supplier List in the Bid form. These substitute suppliers will only be considered after award of the Agreement. The procedure for the submittal of substitute or “or equal” products is specified in section 6.7 of the General Conditions.
10. SUBMISSION OF BIDS. The Bid shall be delivered by the time and to the place set forth in the Notice Inviting Bids. It is the Bidder’s sole responsibility to see that its Bid is received in proper time. It is the Bidders responsibility to point out any errors or discrepancies in the bid documents.
11. BID SECURITY, BONDS AND INSURANCE. Each Bid shall be accompanied by a certified or cashier’s check or approved Bid bond in the amount stated in the Notice Inviting Bids. Said check or bond shall be made payable to the City of El Centro and shall be given as a guarantee that the Bidder, if awarded the Agreement, will enter into an Agreement with OWNER, and will furnish the necessary insurance certificates, payment bond and performance bond; each of said Bonds to be in the amount stated in the Supplementary General Conditions. In case of refusal or failure to enter into said Agreement, the check or Bid bond, as the case may be, shall be forfeited to OWNER. If the Bidder elects to furnish a Bid bond as its Bid security, the Bidder shall use the Bid bond form bound herein, or one conforming substantially to it in form.
12. DISCREPANCIES IN BIDS. In the event of a discrepancy between words and numbers in the Bid, the words shall govern. In the event there are unit price Bid items in the Schedule of Values and the amount indicated for a unit price Bid item does not equal the product of the unit price and quantity, the unit price shall govern and the amount will be corrected accordingly, and the Bidder shall be bound by said correction. In the event there is more than one (1) Bid item in the Schedule of Values and the total indicated for the schedule does not agree with the sum of the prices bid on the individual items, the prices bid on the individual items shall govern and the total for the schedule will be corrected accordingly, and the Bidder shall be bound by said correction.
Exhibit A
BD-7
06/2026/A26-0119/BidDocs
13. MODIFICATIONS AND UNAUTHORIZED ALTERNATIVE BIDS. Unauthorized conditions, limitations or provisos attached to the Bid will render it informal and may cause its rejection as being non-responsive. The completed Bid forms shall be without interlineations, alterations or erasures in the printed text. Alternative Bids will not be considered unless called for. Oral, telegraphic or telephonic Bids or modifications will not be considered.
14. WITHDRAWAL OF BID. The Bid may be withdrawn by the Bidder by means of a written request, signed by the Bidder or its properly authorized representative. Such written request must be delivered to the place stipulated in the Notice Inviting Bids for receipt of Bids prior to the scheduled closing time for receipt of Bids.
15. BID RESULTS. To obtain bid results, provide a self-addressed, stamped envelope, referencing “GILLET RD. REHABILITATION PROJECT LPPSB1L-5169 (064)” Bid tabulation will be mailed to you after verification of extensions. Bid results will not be given out over the telephone. Bid results may be posted on City’s website.
16. AWARD OF CONTRACT. Award of a contract, if it be awarded, will be on the basis of the Bid proposal estimated quantities and will be made to the lowest responsive Bidder whose Bid complies with all the requirements prescribed. Unless otherwise specified, any such award will be made within the period stated in the Notice Inviting Bids that the Bids are to remain open. Unless otherwise indicated, a single award will be made for all the Bid items in an individual Bid schedule. The lowest Bid shall be the lowest total of the Bid prices on the base contract.
17. RETURN OF BID SECURITY. Within fourteen (14) working Days after award of the Agreement, OWNER will return the Bid securities accompanying such of the Bids as are not considered in making the award. All other Bid securities will be held until the Agreement has been finally executed. They will then be returned to the respective Bidders whose Bids they accompany.
18. EXECUTION OF AGREEMENT. The apparent low Bidder will be required to execute a written Agreement with OWNER on the form of agreement provided, shall secure all insurance and shall furnish all certificates and Bonds required by the Contract Documents within fourteen (14) calendar Days after receipt of notification that the Bidder is the apparent low Bidder. Failure or refusal to enter into an Agreement as herein provided or to conform to any of the stipulated requirements in connection therewith shall be considered non-responsive and result in the forfeiture of the Bid security. If the lowest responsive Bidder refuses or fails to execute the Agreement, OWNER may proceed to the second lowest responsive Bidder. If the second lowest responsive Bidder refuses or fails to execute the Agreement, OWNER may proceed to the third lowest responsive Bidder. On the failure or refusal of such second or third lowest Bidder to execute the Agreement, each such Bidder’s Bid securities shall be likewise forfeited to OWNER.
Exhibit A
BD-8
06/2026/A26-0119/BidDocs
19. LIQUIDATED DAMAGES. Provisions for liquidated damages, if any, are set forth in the Agreement.
20. WORKERS’ COMPENSATION REQUIREMENT. The Bidder should be aware that in accordance with section 3700 of the California Labor Code it will, if awarded the Agreement, be required to secure the payment of compensation to its employees and execute the Workers’ Compensation Certification in the form contained in these Contract Documents.
- END OF INSTRUCTIONS TO BIDDERS -
Exhibit A
BD-9
06/2026/A26-0119/BidDocs
SECTION 00300A
BID FORMS
BID TO: CITY OF EL CENTRO
1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Contract Documents (as defined in Article 6 of the Agreement) to perform the WORK as specified or indicated in said Contract Documents entitled “GILLET RD. REHABILITATION PROJECT LPPSB1L-5169 (064)”
2. Bidder accepts all of the terms and conditions of the Contract Documents, including without limitation those in the Notice Inviting Bids and Instructions to Bidders, dealing with the disposition of the Bid security.
3. This Bid will remain open for the period stated in the Notice Inviting Bids unless otherwise required by law. Bidder will enter into an Agreement within the time and in the manner required in the “Notice Inviting Bids” and the “Instructions to Bidders,” and will furnish the insurance certificates, Payment Bond and Performance Bond required by the Contract Documents.
4. Bidder has examined copies of all the Contract Documents including the following Addenda (receipt of all of which is hereby acknowledged):
Number ______ ______ ______ ______ ______ ______
Date ______ ______ ______ ______ ______ ______
5. Bidder has familiarized itself with the nature and extent of the Contract Documents, WORK, site, locality where WORK is to be performed, the legal requirements (Federal, State and local laws, ordinances, rules and regulations) and the conditions affecting cost, progress or performance of the WORK and has made such independent investigations as Bidder deems necessary.
To all the foregoing, and including all Bid schedule(s) and information required of Bidder contained in this Bid form, said Bidder further agrees to complete the WORK required under the Contract Documents within the Contract Time set forth in said Contract Documents, and to accept in full payment therefore the Contract Price based on the total Bid price(s) named in the aforementioned Bid schedule(s).
Dated: Bidder:
By:
(Signature)
Title:
Exhibit A
BD-10
06/2026/A26-0119/BidDocs
BID SCHEDULE - PRICES
Pursuant to and in compliance with the Invitation for Bids and other Contract Documents relating to the proposal for the construction of GILLET RD. REHABILITATION PROJECT
LPPSB1L-5169 (064)
all in accordance with the Drawings and Project Specifications the undersigned Bidder, having familiarized himself with the terms of the Agreement, the local conditions affecting the performance of the Agreement and the cost of the WORK at the place the WORK is to be done; and with the Drawings, Project Specifications and other Contract Documents, hereby stipulated; CONTRACTOR agrees to complete the Agreement, including all of its component parts and everything required to be performed, and to provide and furnish any and all labor, materials, equipment, tools, expendable supplies, and all utility and transportation services necessary to perform the Agreement, and complete in a workmanlike manner all of the WORK required in connection with the Agreement, all in strict conformance with the Drawings and Specifications for the following prices and sum.
The following Bid Schedule of estimated quantities is included for convenience of bidding and a basis for comparison of Bids only, and CITY does not, expressly, or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the WORK, or to delete portions of the WORK, as may be deemed necessary or advisable by CITY.
All Bidders are REQUIRED to use unit prices where indicated and to complete this schedule.
All items shall be complete and in place per Plans and these Bid and Contract Documents.
Note: Payment for all work (labor, material, equipment, etc.) required for the construction and installation of the improvement as shown on the plans which is not specifically identified below in the Bid Schedule shall be considered as included in the CONTRACTOR’s price, as itemized below, for the various items of work for which the work is required, and no additional compensation shall be made therefor.
Exhibit A
BD-11
06/2026/A26-0119/BidDocs
PROPOSAL BID FORM
BASE BID SCHEDULE
Pursuant to and in compliance with the Notice Inviting Bids and the other documents relating thereto, the undersigned Bidder, having familiarized himself/herself with the terms of the Contract and the Contract Documents, the local conditions affecting the performance of the Contract and the cost of the work at the place where the work is to be done, hereby proposes and agrees to perform within the time stipulated, the Work of the Contract, including all of its component parts, and the furnishing of all materials and equipment required to be incorporated in the form a permanent part of the work; the furnishing of tools, equipment, supplies, transportation, utilities, facilities, labor, superintendence and services required to perform and complete the work; bonds, insurance and submittals; and including the assumption of all obligations, duties and responsibilities necessary to the successful completion of the Contract, including its acceptance by the OWNER, for the following Project:
PROJECT NAME:
GILLET RD. REHABILITATION PROJECT
The total lump sum price bid shall be the total price to fully deliver a complete and in place project in accordance with the contract documents.
BID PROPOSAL SUMMARY*
TOTAL PRICE FOR BASE BID ITEMS (in figures): _________________________________ TOTAL PRICE FOR BASE BID ITEMS (in words): _________________________________
Bidder’s Initials ____________
Exhibit A
BD-12
06/2026/A26-0119/BidDocs
BASE BID SCHEDULE
ITEM
NO. DESCRIPTION UNIT QUANTITY UNIT PRICE
TOTAL
PRICE
1 MOBILIZATION /
DEMOBILIZATION / REQUIRED
PERMITS
LS 1
2 TRAFFIC CONTROL LS 1
3 ½” COLD MILL SY 8,350
4 INSTALL 3/8” ARAM INCLUDING
TACK COAT SY 7,600
5 INSTALL 2.5” Gap Graded RHMA
INCLUDING TACK COAT TON 1,100
6 INSTALL 2.5” OF CONVENTIONAL
¾” HMA TYPE-A PG 70-10
INCLUDING TACK COAT
TON 110
7 SHOULDER GRADE ALONG EDGE
OF ROADWAY LS 1
8 DOUBLE ADJUST WATER VALVE EA 2
9 EROSION CONTROL LS 1
10 GEOTECHNICAL AND MATERIAL
TESTING LS 1
11 STREET STRIPING AND
PAVEMENT MARKINGS LS 1
12 REMOVE AND REPLACE AC DIKE
WITH PCC CURB AND GUTTER LF 520
13 MONUMENT PRESERVATION
CERTIFICATE;
RE-ESTABLISHMENT OF
MONUMENTS NOT FOUND IN
THE WORK AREA & PROTECTION
OF THOSE THAT ARE.
LS 1
BASE BID TOTAL (in numbers) $________________________________________________________
Exhibit A
BD-13
06/2026/A26-0119/BidDocs
LIST OF SUBCONTRACTORS
The Bidder shall list below the name and the location of the place of business of each Subcontractor who will perform work or labor or render service to CONTRACTOR in or about the construction of the WORK, or a Subcontractor licensed by the State who, under subcontract to CONTRACTOR, specially fabricates and installs a portion of the WORK according to detailed Drawings contained in the plans and specifications, in an amount in excess of one-half (0.5) of one (1.0) percent of CONTRACTOR’s total Bid. The Bidder shall also list below the portion of the WORK which will be done by each Subcontractor under this contract.
CONTRACTOR shall list only one (1) Subcontractor for each portion of the WORK. If Bidder does NOT intend to use ANY subcontractors, state “NONE” in the first block.
Substitutions of subcontractors listed will not be permitted unless approved by the City of El Centro.
The Bidder’s attention is directed to Paragraph 6.5.3 entitled “Subcontract Limitations” of the General Conditions which sets forth the percent of the WORK to be performed with the Bidders’ own forces. Failure to comply with this requirement will render the Bid non-responsive and may cause its rejection.
PORTION OF WORK NAME OF
SUBCONTRACTOR
CONTRACTOR LICENSE
& DIR REGISTRATION
NUMBER
PLACE OF BUSINESS
ADDRESS/TELEPHONE No.
USE ADDITIONAL FORMS AS NECESSARY
Exhibit A
BD-14
06/2026/A26-0119/BidDocs
GENERAL INFORMATION
BIDDER’S GENERAL INFORMATION:
The Bidder shall furnish the information requested below. Additional sheets shall be attached as required. Failure to complete Item Nos. 1 through 3 will cause the Bid to be non-responsive and shall cause its rejection. In any event, no award will be made until all of the Bidder’s general information (i.e., items 1 through 3, inclusive) is delivered to OWNER.
INFORMATION TO BE PROVIDED BY ALL BIDDERS WITH BID SUBMITTAL:
(1) CONTRACTOR’s name and address:
(2) CONTRACTOR’s telephone number: FAX number:
(3) CONTRACTOR’s license: Primary classification
California State License No. and Expiration Date
Registration No. __________________-
Supplemental classifications held, if any:
Name of Licensee, if different from (1) above:
To be considered for award, CONTRACTOR shall have met all requirements established by OWNER of the Project.
- END GENERAL INFORMATION –
Exhibit A
BD-15
06/2026/A26-0119/BidDocs
NONCOLLUSION DECLARATION
TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
The undersigned declares:
I am the __________________ of ______________________, the party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham.
The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ____________ [date], at ______________________ [city], ________________________ [state]. - END NONCOLLUSION DECLARATION –
Exhibit A
BD-16
06/2026/A26-0119/BidDocs
BID BOND
KNOW ALL MEN BY THESE PRESENTS,
That _____________________________ as Principal, and ____________________as Surety, are held and firmly bound unto the City of El Centro, hereinafter called “OWNER,” in the sum of __________________________ dollars, (_______________) (not less than ten (10) percent of the total amount of the Bid) for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
WHEREAS, said Principal has submitted a Bid to said OWNER to perform the WORK required under the Bid schedule(s) of OWNER’s Contract Documents entitled:
NOW THEREFORE, if said Principal is awarded a contract by said OWNER and, within the time and in the manner required in the Notice Inviting Bids and the Instructions to Bidders enters into a written Agreement on the form of agreement bound with said Contract Documents, furnishes the required certificates of insurance and furnishes the required Performance Bond and Payment Bond, then this obligation shall be null and void, otherwise it shall remain in full force and effect. In the event suit is brought upon this Bond by said OWNER and OWNER prevails, said Surety shall pay all costs incurred by said OWNER in such suit, including reasonable attorneys’ fee to be fixed by the court and actual costs.
SIGNED AND SEALED, this day of , 20
(SEAL) (SEAL)
(Principal) (Surety)
By: By:
(Signature) (Signature)
(SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETY)
- END BID BOND –
Exhibit A
BD-17
06/2026/A26-0119/BidDocs
CORPORATE CERTIFICATION
OR
PARTNERSHIP INFORMATION
Name of Corporation or Partnership________________________________________________ State of Incorporation___________________________________________________________ List names and addresses of each partner, or titles, names and business addresses of President, Secretary and Treasurer.
______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ Date_____________________________ Contractor__________________________ Signature_________________________ Title________________________________ ATTEST:
__________________________________
Signature by
__________________________________
Title
END OF CORPORATE CERTIFICATION OR PARTNERSHIP INFORMATION
Exhibit A
BD-18
06/2026/A26-0119/BidDocs
DRUG/ALCOHOL TESTING REQUIREMENTS
CONTRACTOR shall execute the following form as required by the Federal Drug and Alcohol, Section 49 CFR Part 382.
I agree to comply with the provisions of Federal Omnibus Transportation Employee Testing Act of 1991, and that I will administer a program of alcohol and drug testing of all commercial vehicle operators, as required by Federal Regulations.
CONTRACTOR certifies compliance with the City of El Centro’s Drug and Alcohol Free Workplace Policy as a condition of the State Drug-Free Workplace Act of 1990 (Government Code sections 8350 et seq.) and the Federal Drug Free Workplace Act of 1988 (41 U.S.C.A. Sections 701 et seq.) In addition, CONTRACTOR agrees to submit a copy of its own drug free workplace policy.
Dated_____________________________
________________________________________
CONTRACTOR’s Name
_________________________________________
CONTRACTOR’s Signature
_________________________________________
Title
- END DRUG/ALCOHOL TESTING REQUIREMENTS –
Exhibit A
BD-19
06/2026/A26-0119/BidDocs
WORKERS’ COMPENSATION CERTIFICATE
(AS REQUIRED BY SECTION 1861
OF THE CALIFORNIA LABOR CODE)
I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the WORK of this Agreement.
CONTRACTOR:
By:
Title:
- END OF WORKERS’ COMPENSATION CERTIFICATE –
Exhibit A
BD-20
06/2026/A26-0119/BidDocs
SITE VISIT CERTIFICATE
THIS IS TO CERTIFY that:
I, ___________________________________________________(name of bidder or his representative) of the _____________________________________________________ (name of construction firm) visited the site in connection with the Bid for the ______________________________________________________________ (name of the Project.)
Having examined the bid documents, I certify that I have acquainted with the nature, geographical and exact location of the works; the general conditions of execution; the neighboring buildings and other constraints that might affect the construction methods; the obligation not to obstruct the traffic where requested, or the flow of any water; the physical conditions specific to the construction sites; the climatic conditions; local conditions; means of communication and transport; the possibility of supplying water, electricity and fuel; the availability of labor sufficient in number and quantity; all constraints and obligations resulting from social, tax and customs legislation; and all conditions and circumstances which might influence the execution or price of the works.
I further certify that I am satisfied with the description of the works and the Project Engineer’s explanations and that I understand perfectly the works to be undertaken as specified and implied in the execution of the Contract.
______________________________________________
(Name and Signature of Bidder or his Representative)
Date : ______________________
Note 1: This form shall be completed at the time of the visit to the site where the works are to be carried out. - END OF SITE VISIT CERTIFICATE –
Exhibit A
BD-21
06/2026/A26-0119/BidDocs
CONTRACTOR’S CERTIFICATION OF QUALIFICATION
FOR LICENSE CLASSIFICATION
1. If an individual, I hereby certify that I am, or my responsible managing employee ________________________ (insert name) is, qualified for the license classification called for in these contract documents.
2. If a co-partnership or limited partnership, the general partner hereby certifies that the general partner _______________________________ (insert name), or responsible managing employee __________________________________ (insert name), is qualified for the license classification called for in these contract documents.
3. If a corporation, or any other combination or organization, the responsible managing officer _______________________________ (insert name), or a responsible managing employee ________________________________ (insert name), is qualified for the license classification called for in these contract documents.
If the individual who qualifies the Contractor for the license classification called for in these contract documents changes during the progress of the work, then Contractor shall, within seven (7) days of any such change, notify the Director of Public Works in writing of such change, including the name, license number and status of the individual.
For the purpose of this Certification, a responsible managing employee shall mean an individual who is a bona fide employee of the Contractor and is actively engaged in the classification of work for which that individual is the qualifying person on behalf of the Contractor under California law.
DATED:____________________ CONTRACTOR:___________________________________ SIGNATURE:_____________________________ TITLE:______________________________ ATTEST:
SIGNATURE BY:___________________________________________ TITLE:__________________________________________________ - END OF CONTRACTOR’S CERTIFICATION OF QUALIFICATION –
- END OF BIDDING DOCUMENTS –
Exhibit A
CD-1
06/2026/A26-0119/BidDocs
CONTRACT DOCUMENTS
Exhibit A
CD-2
06/2026/A26-0119/BidDocs
CITY OF EL CENTRO
GILLET RD. REHABILITATION PROJECT
LPPSB1L-5169 (064)
CONSTRUCTION SERVICES AGREEMENT
This CONSTRUCTION SERVICES AGREEMENT (“Agreement”), is made and effective as of the last signature date set forth below (“Effective Date”), by and between the City of El Centro, a municipal corporation ("CITY"), and , a ("CONTRACTOR"). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows:
I. SCOPE OF WORK
A. Incorporation of Documents. This Agreement includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto for the Gillet Rd.
Rehabilitation Project LPPSB1L-5169 (064) (“Project”): Furnishing all labor, materials, equipment, and other incidental and appurtenant work necessary to complete the grinding of existing asphalt concrete pavement, installation of asphalt-rubber and aggregate membrane, installation of gap graded (GG) asphalt-rubber hot mix, installation of conventional asphalt concrete, installation of curb and gutter, utility cover adjustments, monument preservation and traffic control.
B. Scope of Work. CONTRACTOR promises and agrees, at its own cost and expense, to furnish to the CITY all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately complete the Project, including all structures and facilities necessary for the Project or described in this Agreement (hereinafter the “Work” or “Project”), for a Total Contract Price as specified pursuant to this Agreement. All Work shall be subject to, and performed in accordance with the above referenced documents, as well as the Exhibits A through E attached hereto and incorporated herein by reference. The plans and specifications for the Work are further described in Exhibit A attached hereto and incorporated herein by this reference. Special conditions, if any, relating to the Work are described in Exhibit B attached hereto and incorporated herein by this reference.
C. Change in Scope of Work. Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion is approved in advance and in writing by a valid change order executed by the CITY.
II. TIME FOR PROJECT COMPLETION
CONTRACTOR shall perform and complete all Work under this Agreement within 90 calendar days, commencing within ten (10) calendar days after receiving a written Notice to Proceed from the CITY. CONTRACTOR shall perform its Work in strict accordance with any completion schedule, construction schedule or Project milestones developed by the CITY.
Exhibit A
CD-3
06/2026/A26-0119/BidDocs
III. THE CONTRACT SUM
As consideration for the performance of the Work required herein, the CITY shall pay to CONTRACTOR the total sum of Dollars cents ($ ) (“Total Contract Price”) provided that such amount shall be subject to adjustment pursuant to the applicable terms of this Agreement or written change orders approved and signed in advance by the CITY.
IV. PROGRESS PAYMENTS
A. Application for Payment. CONTRACTOR shall submit to the CITY an itemized application for payment in the format supplied by the CITY indicating the amount of Work completed since commencement of the Work or since the last progress payment. These applications shall be supported by evidence which is required by this Agreement and such other documentation as the CITY may require. CONTRACTOR shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated. CONTRACTOR may be required to furnish a detailed schedule of values upon request of the CITY and in such detail and form as the CITY shall request, showing the quantities, unit prices, overhead, profit, and all other expenses involved in order to provide a basis for determining the amount of progress payments.
The CITY shall review and pay all progress payment requests in accordance with the provisions set forth in Article 1.7 (commencing at Section 20104.50) of Division 2, Part 3 of the Public Contract Code. No progress payments will be made for Work not completed in accordance with this Agreement.
B. Retentions. From each approved progress estimate, five percent (5%) may be deducted and retained by the CITY, and the remainder will be paid to CONTRACTOR.
All retentions shall be released and paid to CONTRACTOR and subcontractors pursuant to California Public Contract Code Section 7107.
C. Deductions. In addition to any retentions, the CITY may deduct from each progress payment an amount necessary to protect the CITY from loss because of: (1) liquidated damages which have accrued as of the date of the application for payment; (2) any sums expended by the CITY in performing any of CONTRACTOR's obligations under this Agreement which CONTRACTOR has failed to perform or has performed inadequately; (3) defective Work not remedied; (4) stop notices as allowed by state law; (5) reasonable doubt that the Work can be completed for the unpaid balance of the Total Contract Price or within the Project Completion Time; (6) unsatisfactory prosecution of the Work by CONTRACTOR; (7) unauthorized deviations from this Agreement; (8) failure of CONTRACTOR to maintain or submit on a timely basis, proper and sufficient documentation as required by this Agreement or by the CITY during the prosecution of the Work; (9) erroneous or false estimates by CONTRACTOR of the value of the Work performed; (10) any sums representing expenses, losses, or damages as determined by the CITY, incurred by the CITY for which CONTRACTOR is liable under this Agreement; and (11) any other sums which the CITY is entitled to recover CONTRACTOR under the
Exhibit A
CD-4
06/2026/A26-0119/BidDocs
terms of this Agreement or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the CITY to deduct any of these sums from a progress payment shall not constitute a waiver of the CITY's right to such sums.
D. Payment to Subcontractors. CONTRACTOR shall pay all subcontractors for and on account of work performed by such subcontractors in accordance with the terms of their respective subcontracts and as provided for in Section 10262 of the California Public Contract Code. Such payments to subcontractors shall be based on the measurements and estimates made and progress payments provided to CONTRACTOR pursuant to this Agreement.
V. RETENTION OF SECURITIES
In accordance with California Public Contract Code Section 22300, the CITY will permit the substitution of securities for any monies withheld by the CITY to ensure performance under this Agreement at the request and expense of CONTRACTOR. At the request and expense of CONTRACTOR, securities equivalent to the amount withheld shall be deposited with the CITY, or with a state or federally chartered bank in California as the escrow agent, and thereafter the CITY shall then pay such monies to CONTRACTOR a they come due. Upon satisfactory completion of this Agreement, the securities shall be returned to CONTRACTOR. For purposes of this Section and Section 22300 of the Public Contract Code, the term “satisfactory completion of the contract” shall mean the time the CITY has issued written final acceptance of the Work and filed a Notice of Completion as required by law and provisions of this Agreement. CONTRACTOR shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. The escrow agreement used for the purposes of this Section shall be in the form provided by the CITY.
VI. TITLE TO WORK
As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the CITY at the time of payment. To the extent that title has not previously been vested in the CITY by reason of payments, full title shall pass to the CITY at delivery of the Work at the destination and time specified in this Agreement. Such transferred title shall in each case be good, and free and clear from any and all security interests, liens, or other encumbrances. CONTRACTOR promises and agrees that it will not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interests, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the CITY, nor relieve CONTRACTOR from the responsibility to strictly comply with this Agreement, and shall not relieve CONTRACTOR of responsibility for any loss or damage to items.
VII. DISPUTE RESOLUTION
Any separate demand by CONTRACTOR for the payment of money or damages shall be resolved in accordance with Public Contract Code Sections 20104, et seq., if applicable.
Exhibit A
CD-5
06/2026/A26-0119/BidDocs
VIII. TERMINATION
This Agreement may be terminated by the CITY at any time by giving CONTRACTOR three (3) days advance written notice. In the event of termination by the CITY for any reason other than the fault of CONTRACTOR, the CITY shall pay CONTRACTOR for all Work performed up to that time as provided herein. In the event of breach of this Agreement by CONTRACTOR, the CITY may terminate this Agreement immediately without notice, may reduce payment to CONTRACTOR in the amount necessary to offset the CITY’s resulting damages, and may pursue any other available recourse against CONTRACTOR. CONTRACTOR may not terminate this Agreement except for cause.
In the event this Agreement is terminated in whole or in part as provided, the CITY may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. Further, if this Agreement is terminated as provided, the CITY may require CONTRACTOR to provide all finished or unfinished documents, data, diagrams, drawings, materials or other matter prepared or built by CONTRACTOR in connection with its performance of this Agreement.
IX. COMPLETION OF WORK
When CONTRACTOR determines that it has completed the Work required herein, CONTRACTOR shall so notify the CITY in writing and shall furnish all labor and material releases required by this Agreement. The CITY shall thereupon inspect the Work. If the Work is not acceptable to the CITY, the CITY shall indicate to CONTRACTOR in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once CONTRACTOR determines that it has completed the incomplete or unsatisfactory Work, CONTRACTOR may request a re-inspection by the CITY. Once the Work is acceptable to CITY, CITY shall pay to CONTRACTOR the Total Contract Price remaining to be paid, less any amount which the CITY may be authorized or directed by law to retain. Payment of retention proceeds due to CONTRACTOR shall be made in accordance with Section 7107 of the California Public Contract Code.
X. CITY’S REPRESENTATIVE
The CITY hereby designates the Public Works Director/City Engineer, or his designee, to act as his representative for the performance of this Agreement (“City’s Representative”). City’s Representative shall have the power to act on behalf of the CITY for all purposes under this Agreement. CONTRACTOR shall not accept direction or orders from any person other than the City’s Representative or his designee.
XI. CONTRACTOR’S REPRESENTATIVE
Before starting the Work, CONTRACTOR shall submit in writing the name, qualifications and experience of its proposed representative who shall be subject to the review and approval of the CITY (“Contractor’s Representative”). Following approval by the CITY, the Contractor’s Representative shall have full authority to represent and act on behalf of CONTRACTOR for all purposes under this Agreement. The Contractor’s Representative
Exhibit A
CD-6
06/2026/A26-0119/BidDocs
shall supervise and direct the Work, using his or her best skill and attention, and shall be responsible for all construction means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portion of the Work under this Agreement.
Contractor’s Representative shall devote full time to the Project and either his or her designee, who shall be acceptable to the CITY, shall be present at the Work site at all times that any Work is in progress and at any time that any employee or subcontractor of CONTRACTOR is present at the Work site. Arrangements for responsible supervision, acceptable to the CITY, shall be made for emergency Work which may be required. Should CONTRACTOR desire to change its Contractor’s Representative, CONTRACTOR shall provide the information specified above and obtain the CITY’s written approval.
XII. CONTRACT INTERPRETATION
Should any question arise regarding the meaning or import of any of the provisions of this Agreement or written change orders approved and signed by the CITY, the matter shall be referred to City’s Representative, whose decision shall be binding upon CONTRACTOR.
XIII. LOSS AND DAMAGE
CONTRACTOR shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the performance of the Work until the same is fully completed and accepted by the CITY. CONTRACTOR shall be responsible for damage proximately caused by “Acts of God,” within the meaning of Section 7105 of the Public Contract Code, only to the extent of five percent (5%) of the Total Contract Price as specified herein. In the event of damage proximately caused by “Acts of God,” the CITY may terminate this Agreement upon three (3) days advanced written notice.
XIV. INDEMNITY, DEFENSE AND HOLD HARMLESS AGREEMENT
CONTRACTOR shall defend with legal counsel approved by the CITY, indemnify and hold the CITY, its officers, officials, employees, volunteers and agents free and harmless from and against any and all claims, demands, causes of action, liability, loss, damage, injury, expense, or cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation), in law or equity, to property or persons, including wrongful death, of every nature arising out of or incident to any alleged acts, omissions, or willful misconduct of CONTRACTOR, its officials, officers, employees, agents, consultants, and subcontractors arising out of or in connection with the performance of the Work, the Project, or this Agreement, including CONTRACTOR’s failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the CITY. Should conflict of interest principles preclude a single legal counsel from representing both the CITY and CONTRACTOR, or should the CITY otherwise find CONTRACTOR’s legal counsel unacceptable, then CONTRACTOR shall reimburse the CITY its costs of defense, including without limitation reasonable attorney fees, expert fees and all other costs and fees of litigation. CONTRACTOR shall pay and satisfy any judgment, award or decree that
Exhibit A
CD-7
06/2026/A26-0119/BidDocs
may be rendered against the CITY or its officers, officials, employees, volunteers or agents, in any such suit, action or other legal proceeding. CONTRACTOR shall reimburse the CITY and its officers, officials, officers, employees, volunteers and/or agents, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. CONTRACTOR’s obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the CITY, its officers, officials, employees, volunteers, or agents. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
CONTRACTOR agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section from each and every subcontractor or any other person or entity involved by, for, with or on behalf of CONTRACTOR in the performance of this Agreement. In the event CONTRACTOR fails to obtain such indemnity obligations from others are required here, CONTRACTOR agrees to be fully responsible according to the terms of this Section. Failure of the CITY to monitor compliance with these requirements imposes no additional obligations on the CITY and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend the CITY as set forth here is binding on the successors, assigns or heirs of CONTRACTOR and shall survive the termination of this Agreement or this Section.
XV. PREVAILING WAGES
CONTRACTOR is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 1600, et seq., ("Prevailing Wage Laws"), the Davis-Bacon Act of 1931 and 23 USC 113, which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. CONTRACTOR agrees to fully comply with such Prevailing Wage Laws.
Wage rates shall conform with those available at www.dir.ca.gov/OPRL/Pwd for Imperial County.
XVI. APPRENTICED OCCUPATIONS
When CONTRACTOR employs workmen in an apprenticed craft or trade, CONTRACTOR shall comply with the provisions of Section 1777.5 of the Labor Code with respect to the employment of properly registered apprentices upon public works. The primary responsibility for compliance with said section for all apprenticed occupations shall be with CONTRACTOR.
XVII. HOURS OF WORK
CONTRACTOR is advised that eight (8) hours labor constitutes a legal day's work.
Pursuant to Section 1813 of the Labor Code, CONTRACTOR shall forfeit a penalty of $25.00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker.
Exhibit A
CD-8
06/2026/A26-0119/BidDocs
XVIII. PAYROLL RECORDS
In accordance with the requirements of Labor Code Section 1776, CONTRACTOR shall keep accurate payroll records which are either on forms provided by the Division of Labor Standards Enforcement or which contain the same information required by such forms.
Responsibility for compliance with Labor Code Section 1776 shall rest solely with CONTRACTOR, and CONTRACTOR shall make all such records available for inspection at all reasonable hours.
XIX. LABOR AND MATERIAL RELEASES
CONTRACTOR shall furnish the CITY with labor and material releases from all subcontractors performing the Work or furnishing materials for the Work governed by this Agreement prior to final payment by the CITY.
XX. EQUAL OPPORTUNITY EMPLOYMENT
CONTRACTOR represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the state or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.
XXI. RECORD AUDIT
In accordance with Government Code, Section 8546.7, records of both the CITY and CONTRACTOR shall be subject to examination and audit by the Auditor General for a period of three (3) years after final payment.
XXII. CLAIM PROCEDURES UNDER PUBLIC CONTRACT CODE SECTION 9204 CONTRACTOR shall comply with the procedure set forth in Public Contract Code Section 9204 for any claim, as that term is defined therein, for one or more of the following: 1) a time extension, including, without limitation, for relief from damages or penalties for delay, 2) payment of money or damages arising from work done pursuant to this Agreement, and/or 3) payment of an amount disputed by the CITY under this Agreement.
The provisions of Public Contract Code Section 9204 are included and incorporated into this Agreement.
XXIII. CERTIFICATIONS
CONTRACTOR shall have a Class A License from the Contractors State License Board of the State of California. By its signature hereunder, CONTRACTOR certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake selfinsurance in accordance with the provisions of that Code, and agrees to comply with such
Exhibit A
CD-9
06/2026/A26-0119/BidDocs
provisions before commencing the performance of the Work. A certification form for this purpose, which is attached to this Agreement as Exhibit C and incorporated herein by reference, shall be executed simultaneously with this Agreement.
XXIV. BONDS
A. Performance Bond. If specifically requested by the CITY, Contractor shall execute and provide to City concurrently with this Agreement a Performance Bond in the amount of the Total Contract Price indicated in this Agreement, and in a form provided or approved by the CITY. If such bond is required, no payment will be made to CONTRACTOR until it has been received and approved by the CITY.
B. Payment Bond. If required by law or otherwise specifically requested by the CITY, CONTRACTOR shall execute and provide to the CITY concurrently with this Agreement a Payment Bond in the amount of the Total Contract Price indicated in this Agreement, and in a form provided or approved by the CITY. If such bond is required, no payment will be made to CONTRACTOR until it has been received and approved by the CITY.
C. Bond Provisions. Should, in CITY's sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, CONTRACTOR shall renew or replace the affected bond within 10 days of receiving notice from the CITY. In the event the surety or CONTRACTOR intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the CITY, and CONTRACTOR shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Agreement until any replacement bonds required by this Section are accepted by the CITY. To the extent, if any, that the total compensation is increased in accordance with this Agreement, CONTRACTOR shall, upon request of the CITY, cause the amount of the bonds to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the CITY. To the extent available, the bonds shall further provide that no change or alteration of this Agreement (including, without limitation, an increase in the total compensation, as referred to above), extensions of time, or modifications of the time, terms, or conditions of payment to CONTRACTOR, will release the surety. If CONTRACTOR fails to furnish any required bond, the CITY may terminate this Agreement for cause.
D. Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, shall be accepted. The surety must be a California-admitted surety with a current A.M. Best’s rating no less than A:VIII and satisfactory to the CITY. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the CITY.
XXV. FINAL PAYMENT AND ANTI-TRUST CLAIMS
Final payment, constituting the entire unpaid balance of the Total Contract Price, shall be paid by the CITY to CONTRACTOR no sooner than thirty-five (35) days after a Notice of
Exhibit A
CD-10
06/2026/A26-0119/BidDocs
Completion has been recorded, unless otherwise stipulated in the Notice of Completion, provided the Work has then been completed, this Agreement fully performed, and (if applicable) a final Certificate for Payment has been issued by the Architect.
In the event California Public Contract Code Section 7103.5 applies to this Agreement, in entering into this Agreement to supply goods, services or materials, CONTRACTOR hereby offers and agrees to assign to the CITY all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to this Agreement. This assignment shall be made and become effective at the time the CITY tender final payment to CONTRACTOR, without further acknowledgment by the parties.
XXVI. CONTRACTOR'S FAILURE TO PROCURE COMPLETION OF PROJECT In the event CONTRACTOR fails to furnish tools, equipment, or labor in the necessary quantity or quality, or fails to perform the Work or any part thereof contemplated by this Agreement in a diligent and workmanlike manner, and if the CONTRACTOR for a period of three (3) calendar days after receipt of written demand from the CITY or City’s Representative to do so, fails to furnish tools, equipment, or labor in the necessary quantity or quality, and to perform its Work and all parts thereof in a diligent and workmanlike manner, or after commencing to do so within said three (3) calendar days, fails to continue to do so; then the CITY may exclude CONTRACTOR from the premises, or any portion thereof, and take possession of said premises or any portion thereof, together with all material and equipment thereon, and may complete the Work contemplated by this Agreement or any portion of said Work, either by furnishing the tools, equipment, labor or material necessary, or by letting the unfinished portion of the Work, or the portion taken over by the CITY to another contractor or by a combination of such methods. In any event, the procuring of the completion of said Work, or the portion thereof taken over by the CITY, shall be a charge against CONTRACTOR, and may be deducted from any money due or becoming due to CONTRACTOR from the CITY, or CONTRACTOR shall pay the CITY the amount of said charge, or the portion thereof unsatisfied. The sureties provided for under this Agreement shall become liable for payment should CONTRACTOR fail to pay in full any said cost incurred by the CITY.
XXVII. WARRANTY
CONTRACTOR warrants all Work under this Agreement (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the Work) to be of good quality and free from any defective or faulty material and workmanship. CONTRACTOR agrees that for a period of one year (or the period of time specified elsewhere in this Agreement or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) after the date of final acceptance, CONTRACTOR shall within ten (10) days after being notified in writing by the CITY of any defect in the Work or non-conformance of the Work to this Agreement, commence and
Exhibit A
CD-11
06/2026/A26-0119/BidDocs
prosecute with due diligence all Work necessary to fulfill the terms of the warranty at his sole cost and expense. CONTRACTOR shall act sooner as requested by the CITY in response to an emergency. In addition, CONTRACTOR shall, at its sole cost and expense, repair and replace any portions of the Work (or work of other contractors) damaged by its defective Work or which becomes damaged in the course of repairing or replacing defective Work. For any Work so corrected, CONTRACTOR's obligation hereunder to correct defective Work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected Work. CONTRACTOR shall perform such tests as the CITY may require verifying that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of this Agreement. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of CONTRACTOR. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Work, whether express or implied, are deemed to be obtained by CONTRACTOR for the benefit of the CITY, regardless of whether or not such warranties and guarantees have been transferred or assigned to the CITY by separate agreement and CONTRACTOR agrees to enforce such warranties and guarantees, if necessary, on behalf of the CITY. In the event that CONTRACTOR fails to perform its obligations under this Section, or under any other warranty or guaranty under this Agreement, to the reasonable satisfaction of the CITY, the CITY shall have the right to correct and replace any defective or non-conforming Work and any work damaged by such work or the replacement or correction thereof at CONTRACTOR's sole expense. CONTRACTOR shall be obligated to fully reimburse the CITY for any expenses incurred hereunder upon demand.
XXVIII. LAWS AND REGULATIONS
CONTRACTOR shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of this Agreement or the Work, including all Cal/OSHA requirements, and shall give all notices required by law. CONTRACTOR shall be liable for all violations of such laws and regulations in connection with Work. If CONTRACTOR observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the CITY in writing. Any necessary changes shall be made by written change order. If CONTRACTOR performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the CITY, CONTRACTOR shall be solely responsible for all costs arising there from. CONTRACTOR shall defend, indemnify and hold the CITY, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.
XXIX. INSURANCE
Prior to the beginning of and throughout the duration of the Work, CONTRACTOR and its subcontractors shall maintain insurance in conformance with the requirements set forth below. CONTRACTOR will use existing coverage to comply with these requirements. If
Exhibit A
CD-12
06/2026/A26-0119/BidDocs
that existing coverage does not meet the requirements set forth herein, CONTRACTOR agrees to amend, supplement or endorse the existing coverage to do so.
CONTRACTOR acknowledges that the insurance coverage and policy limits set forth in this Section constitute the minimum amount of coverage required. Any insurance proceeds available to CONTRACTOR or its subcontractors in excess of the limits and coverage required by this Agreement and which is applicable to a given loss, claim or demand, will be equally available to the CITY.
Without limiting CONTRACTOR’s indemnification of the CITY, and prior to commencement of the Work, CONTRACTOR shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to the CITY. CONTRACTOR shall provide the following types and amounts of insurance:
A. General liability insurance. CONTRACTOR shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.
B. Automobile liability insurance. CONTRACTOR shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the CONTRACTOR arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.
C. Umbrella or excess liability insurance. CONTRACTOR shall obtain and maintain an umbrella or excess liability insurance that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability and employer’s liability. Such policy or policies shall include the following terms and conditions:
A drop down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason;
Pay on behalf of wording as opposed to reimbursement; Concurrency of effective dates with primary policies; Policies shall “follow form” to the underlying primary policies; and Insureds under primary policies shall also be insureds under the umbrella or excess policies.
D. Workers’ compensation insurance. CONTRACTOR shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with
Exhibit A
CD-13
06/2026/A26-0119/BidDocs
limits of at least $1,000,000) for CONTRACTOR’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, CONTRACTOR shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees.
CONTRACTOR shall submit to the CITY, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the CITY, its officers, agents, employees and volunteers.
E. Pollution liability insurance. Environmental Impairment Liability Insurance shall be written on CONTRACTOR’s Pollution Liability form or other form acceptable to the CITY providing coverage for liability arising out of sudden, accidental and gradual pollution and remediation. The policy limit shall be no less than $1,000,000 dollars per claim and in the aggregate. All activities contemplated in this Agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for the hauling of waste from the Project site to the final disposal location, including non-owned disposal sites.
Products/completed operations coverage shall extend a minimum of three (3) years after Project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. The policy shall specifically provide for a duty to defend on the part of the insurer. The CITY, its officials, officers, agents, and employees, shall be included as insureds under the policy.
F. Builder’s risk insurance. Upon commencement of construction and with approval of CITY, CONTRACTOR shall obtain and maintain builder’s risk insurance for the entire duration of the Project until only the CITY has an insurable interest. The Builder’s Risk coverage shall include the coverages as specified below.
The named insureds shall be CONTRACTOR and the CITY, including its officers, officials, employees, and agents. All Subcontractors (excluding those solely responsible for design Work) of any tier and suppliers shall be included as additional insureds as their interests may appear. CONTRACTOR shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to the CITY. The policy shall contain a provision that all proceeds from the builder’s risk policy shall be made payable to the CITY. The CITY will act as a fiduciary for all other interests in the Project.
Policy shall be provided for replacement value on an "all risk" basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, nonconforming Work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials,
Exhibit A
CD-14
06/2026/A26-0119/BidDocs
facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Project site or any staging area. Such insurance shall be on a form acceptable to the CITY to ensure adequacy of terms and sub limits and shall be submitted to the CITY prior to commencement of the Work.
G. Other provisions or requirements
(1) Proof of insurance. CONTRACTOR shall provide certificates of insurance to the CITY as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by the CITY’s risk manager prior to commencement of performance. Current certification of insurance shall be kept on file with the CITY at all times during the term of this Agreement. The CITY reserves the right to require complete, certified copies of all required insurance policies, at any time. (2) Duration of coverage. CONTRACTOR shall procure and maintain for the duration of this Agreement insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by CONTRACTOR, his agents, representatives, employees or subcontractors.
CONTRACTOR must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. The CITY and its officers, officials, employees, and agents shall continue as additional insureds under such policies.
(3) Primary/noncontributing. Coverage provided by CONTRACTOR shall be primary and any insurance or self-insurance procured or maintained by the CITY shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of the CITY before the CITY’s own insurance or self-insurance shall be called upon to protect it as a named insured.
(4) City’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these requirements or is canceled and not replaced, the CITY has the right but not the duty to obtain the insurance it deems necessary and any premium paid by the CITY will be promptly reimbursed by CONTRACTOR or the CITY will withhold amounts sufficient to pay premium from CONTRACTOR payments. In the alternative, the CITY may immediately terminate this Agreement. (5) Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of
Exhibit A
CD-15
06/2026/A26-0119/BidDocs
insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the CITY’s risk manager.
(6) Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against the CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow CONTRACTOR or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. CONTRACTOR hereby waives its own right of recovery against the CITY, and shall require similar written express waivers and insurance clauses from each of its sub-consultants/subcontractors. (7) Enforcement of contract provisions (non estoppel). CONTRACTOR acknowledges and agrees that any actual or alleged failure on the part of the CITY to inform CONTRACTOR of non-compliance with any requirement imposes no additional obligations on the CITY nor does it waive any rights hereunder. (8) Requirements not limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If CONTRACTOR maintains higher limits than the minimums shown above, the CITY requires and shall be entitled to coverage for the higher limits maintained by CONTRACTOR. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the CITY. (9) Notice of cancellation. CONTRACTOR agrees to oblige its insurance agent or broker and insurers to provide to the CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.
(10) Additional insured status. General liability policies shall provide or be endorsed to provide that the CITY and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies.
(11) Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to the CITY and approved of in writing.
(12) Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that CONTRACTOR’s insurance shall apply separately to each insured against who claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.
Exhibit A
CD-16
06/2026/A26-0119/BidDocs
(13) Pass through clause. CONTRACTOR agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project that is brought onto or involved in the project by CONTRACTOR, provide the same minimum insurance coverage and endorsements required of CONTRACTOR. CONTRACTOR agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this Section. CONTRACTOR agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the Project will be submitted to the CITY for review. (14) City’s right to revise requirements. The CITY reserves the right at any time during the term of this Agreement to change the amounts and types of insurance required by giving CONTRACTOR a ninety (90) day advance written notice of such change. If such change results in substantial additional cost to CONTRACTOR, the CITY and CONTRACTOR may renegotiate CONTRACTOR’s compensation. (15) Self-insured retentions. Any self-insured retentions must be declared to and approved by the CITY. The CITY reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the CITY. (16) Timely notice of claims. CONTRACTOR shall give the CITY prompt and timely notice of claims made or suits instituted that arise out of or result from CONTRACTOR’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
(17) Additional insurance. CONTRACTOR shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.
XXX. CONTRACTOR'S LICENSE; CITY BUSINESS LICENSE
CONTRACTOR shall be responsible for securing, at its own expense, and paying for all permits and licenses necessary to perform the Work described herein. CONTRACTOR must possess at the time of commencing work and throughout the Project duration, a Contractor's License, issued by the State of California, which is current and in good standing. CONTRACTOR shall ensure that any subcontractor working on the Project possesses at the time of commencing work and throughout the Project duration, a Contractor's License, issued by the State of California, which is current and in good standing.
CONTRACTOR shall have a current City business license at the time of commencement of work on the project.
XXXI. REGISTRATION REQUIREMENTS
Pursuant to Section 1771.1(a) of the Labor Code:
Exhibit A
CD-17
06/2026/A26-0119/BidDocs
“A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.” CONTRACTOR must be registered with the Department of Industrial Relations (DIR) of the State of California in order to be eligible to work on public works projects.
CONTRACTOR must ensure registration with the DIR that is active and in good standing.
No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
CONTRACTOR is not subject to public works requirements (including registration with the DIR) if the public works project is under $1,000, unless the CITY knows that CONTRACTOR will be awarded total project costs in excess of $1,000 for a given year.
XXXII. CORPORATION IN GOOD STANDING
If CONTRACTOR is a corporation, the undersigned hereby represents and warrants that the corporation is duly incorporated and in good standing in the State of California, and that , whose title is , is authorized to act for and bind the corporation.
XXXIII. PROVISIONS REQUIRED BY LAW
Each and every provision of law and clause required by law to be inserted in this Agreement shall be deemed to be inserted herein and the Agreement shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not currently inserted, then upon application of either party the Agreement shall forthwith be physically amended to make such insertion or correction.
CONTRACTOR shall provide Faithful Performance and Labor and Materials bonds in the forms attached as Exhibit D and E, respectively, and incorporated herein by reference, and as acceptable to the CITY.
Exhibit A
CD-18
06/2026/A26-0119/BidDocs
XXXIV. SUBSURFACE HAZARDOUS MATERIALS
A. In the event trenches or other excavations extend deeper than four (4) feet below the surface, CONTRACTOR shall promptly, and before the following conditions are disturbed, notify the CITY in writing of any:
1. Material that CONTRACTOR believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code that is required to be removed to a Class I, Class II or Class III disposal site in accordance with the provisions of existing law.
2. Subsurface or latent physical conditions at the site differing from those indicated.
3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in the Work or the character provided for in this Agreement.
B. Upon receipt of said notification the CITY will investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in CONTRACTOR's cost of or the time required for performance of any part of the Work, the CITY will issue a change order as set forth herein.
C. In the event that a dispute arises between the CITY and CONTRACTOR whether the conditions materially differ, or involve hazardous waste or cause a decrease or increase in CONTRACTOR's cost of or time required for performance of any part of the Work, CONTRACTOR shall not be excused from any scheduled completion date provided for by this Agreement, but shall proceed with all Work to be performed under this Agreement. CONTRACTOR shall retain any and all rights provided either by this Agreement or by law which pertain to the resolution of disputes and protests between the contracting parties.
XXXV. LIQUIDATED DAMAGES
Pursuant to Government Code Section 53069.85, if the Work is not completed within the Project Completion Time or in strict accordance with any completion schedule, construction schedule or Project milestones developed by the CITY, it is understood, acknowledged and agreed that the CITY will suffer damage. It is therefore agreed that CONTRACTOR shall pay to the CITY the sum of one thousand five hundred dollars ($1,500) for each and every calendar day of delay beyond the Project Completion Time, or beyond any completion schedule, construction schedule or Project milestones developed by the CITY, or beyond the time indicated in the completion schedule, construction schedule or Project milestones developed by the CITY for any individual task or activity.
CONTRACTOR expressly understands, acknowledges and agrees that such liquidated damages can and shall be imposed if CONTRACTOR does not meet each and every aspect of any completion schedule, construction schedule or Project milestones developed by the CITY. If the CITY accepts Work or makes any payment under this Agreement after a
Exhibit A
CD-19
06/2026/A26-0119/BidDocs
default by reason of delays, the acceptance of such Work and/or payment(s) shall in no respect constitute a waiver or modification of any provisions regarding Project Completion Time, a completion schedule, completion schedule, construction schedule or Project milestones developed by the CITY or the accrual of liquidated damages. In the event the same is not paid, CONTRACTOR further agrees that the CITY may deduct the amount thereof from any money due or that may become due to CONTRACTOR under this Agreement. This Article does not exclude recovery of any other damages and is expressly in addition to the CITY’s ability to seek other damages.
XXXVI. NOTICES
All notices hereunder and communications regarding interpretation of the terms of this Agreement or changes thereto shall be provided by the mailing thereof by registered or certified mail, return receipt requested, postage prepaid and addressed as follows:
CITY CONTRACTOR
City of El Centro ____________________________
Public Works Department ____________________________
307 W. Brighton Ave. ____________________________
El Centro, CA 92243 ____________________________
Attn: Abraham Campos, Public Works Director Attn:________________________ Any notice so given shall be considered received by the other party three (3) days after deposit in the U.S. Mail as stated above and addressed to the party at the above address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.
XXXVII. ENTIRE CONTRACT
This Agreement constitutes the entire contract of the parties. No other agreements or contracts, whether oral or written, pertaining to the Work to be performed, exist between the parties. This Agreement can be modified only by an amendment in writing, signed by both parties.
XXXVIII. GOVERNING LAW
This Agreement shall be governed by the laws of the State of California.
XXXIX. COUNTERPARTS
This Contract may be executed in counterparts, each of which shall constitute an original.
IN WITNESS WHEREOF, each of the parties has caused this Agreement to be executed on the Effective Date.
CONTRACTOR CITY
________________________ City of El Centro
a ______________________ a California municipal corporation
Exhibit A
CD-20
06/2026/A26-0119/BidDocs
By: ____________________________ By: ____________________________ Title: __________________________ Title: __________________________ Date: __________________________ Date: __________________________ ATTEST:
By _____________________________
Norma Wyles, City Clerk
ATTACHMENTS:
Exhibit A Plans and Specifications
Exhibit B Special Provisions
Exhibit C Contractor’s Certification Form
Exhibit D Faithful Performance Bond
Exhibit E Labor and Materials Bond
Exhibit A
CD-21
06/2026/A26-0119/BidDocs
EXHIBIT A
PLANS AND SPECIFICATIONS
Exhibit A
CD-22
06/2026/A26-0119/BidDocs
EXHIBIT B
SPECIAL PROVISIONS
Exhibit A
CD-23
06/2026/A26-0119/BidDocs
EXHIBIT C
CONTRACTOR’S CERTIFICATION FORM
I, the undersigned Contractor, am aware of the provisions of Section 3700 et seq. of the Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of the Code, and I, the undersigned Contractor, agree to and will comply with such provisions before commencing the performance of the Work on this Contract.
[INSERT CONTRACTOR'S NAME]
By: ____________________________
[INSERT NAME]
[INSERT TITLE]
Exhibit A
CD-24
06/2026/A26-0119/BidDocs
EXHIBIT D
FAITHFUL PERFORMANCE BOND
Whereas, The City Council of the City of El Centro, State of California, and _(hereinafter designated as “principal”) have entered into an agreement whereby principal agrees to install and complete certain designated public improvements, which said agreement, dated __________, 20__, and identified as project , is hereby referred to and made a part hereof; and Whereas, Said principal is required under the terms of said agreement to furnish a bond for the faithful performance of said agreement.
Now, therefore, we, the principal and , as surety, are held and firmly bound unto the City of El Centro (hereinafter designated as “El Centro”) in the penal sum of dollars ($ ) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.
The condition of this obligation is such that if the above-bounded principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the said agreement and any alteration thereof made as therein provided, on his or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless El Centro, its officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney’s fees, incurred by El Centro in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.
The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the specifications accompanying the same shall in anywise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.
In Witness Whereof, this instrument has been duly executed by the principal and surety above named, on ______________________, 20__.
(SEAL) (SEAL)
(CONTRACTOR) (Surety)
Exhibit A
CD-25
06/2026/A26-0119/BidDocs
By: By:
(Signature) (Signature)
- END OF PERFORMANCE BOND –
Exhibit A
CD-26
06/2026/A26-0119/BidDocs
EXHIBIT E
LABOR AND MATERIALS BOND
Whereas, the City Council of the City of El Centro, State of California, and (hereinafter designated as ''the Principal") have entered into an Agreement dated __________, 20__, and described as _whereby the Principal agrees to install and complete certain designated public improvements identified as _which are part of City project , and which Agreement is hereby referred to and made a part hereof; and Whereas, under the terms of the Agreement, the Principal is required before entering upon the performance of the work to file a good and sufficient payment bond with the City of El Centro to secure the claims referenced in Civil Code Sections 9550 et seq.; and
Now, therefore, the Principal and the undersigned as corporate surety, are held firmly bound unto the City of El Centro and all contractors, subcontractors, laborers, materialmen, and other persons employed in the performance of the Agreement and referenced in Sections 9550 et seq of the Civil Code in the sum of _dollars ($ ), for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to this work or labor, that the surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by the City of El Centro in successfully enforcing this obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.
It is hereby expressly stipulated and agreed that this bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Section 9550 et seq of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.
Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.
The surety hereby stipulates and agrees that no change, extension of time, alteration. or addition to
the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension, alteration, or addition.
In witness whereof, this instrument has been duly executed by the principal and surety above named, on________________, 20___. _______________________________ ____________________
(CONTRACTOR) (Surety)
By:__________________________ By:_______________________________ (Signature) (Signature)
Exhibit A
CD-27
06/2026/A26-0119/BidDocs
-END OF PAYMENT BONDPage 102 of 279
Exhibit A
CD-28
06/2026/A26-0119/BidDocs
Public Contract Code Section 22300
(a) For purposes of this section, “contractor” includes, but is not limited to, a contractor performing a public works contract, as defined in Section 1101, and any person or entity that would qualify as a contractor under Section 6106.5.
(b) Provisions shall be included in any invitation for bid and in any contract documents to permit the substitution of securities for any moneys withheld by a public agency to ensure performance under a contract; however, substitution of securities provisions shall not be required in contracts in which there will be financing provided by the Farmers Home Administration of the United States Department of Agriculture pursuant to the Consolidated Farm and Rural Development Act (7 U.S.C. Sec. 1921 et seq.), and where federal regulations or policies, or both, do not allow the substitution of securities. At the request and expense of the contractor, securities equivalent to the amount withheld shall be deposited with the public agency, or with a state or federally chartered bank in this state as the escrow agent, who shall then pay those moneys to the contractor. Upon satisfactory completion of the contract, the securities shall be returned to the contractor.
(c) Alternatively, the contractor may request and the owner shall make payment of retentions earned directly to the escrow agent at the expense of the contractor. At the expense of the contractor, the contractor may direct the investment of the payments into securities and the contractor shall receive the interest earned on the investments upon the same terms provided for in this section for securities deposited by the contractor. Upon satisfactory completion of the contract, the contractor shall receive from the escrow agent all securities, interest, and payments received by the escrow agent from the owner, pursuant to the terms of this section. (d) Securities eligible for investment under this section shall include those listed in Section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the contractor and the public agency.
The contractor shall be the beneficial owner of any securities substituted for moneys withheld and shall receive any interest thereon.
Failure to include these provisions in bid and contract documents shall void any provisions for performance retentions in a public agency contract.
For purposes of this section, the term “public agency” shall include, but shall not be limited to, chartered cities.
(e) (1) Any contractor who elects to receive interest on moneys withheld in retention by a public agency shall, at the request of any subcontractor, make that option available to the subcontractor
Exhibit A
CD-29
06/2026/A26-0119/BidDocs
regarding any moneys withheld in retention by the contractor from the subcontractor. If the contractor elects to receive interest on any moneys withheld in retention by a public agency, then the subcontractor shall receive the identical rate of interest received by the contractor on any retention moneys withheld from the subcontractor by the contractor, less any actual pro rata costs associated with administering and calculating that interest. In the event that the interest rate is a fluctuating rate, the rate for the subcontractor shall be determined by calculating the interest rate paid during the time that retentions were withheld from the subcontractor. If the contractor elects to substitute securities in lieu of retention, then, by mutual consent of the contractor and subcontractor, the subcontractor may substitute securities in exchange for the release of moneys held in retention by the contractor.
(2) This subdivision shall apply only to those subcontractors performing more than five percent of the contractor’s total bid.
(3) No contractor shall require any subcontractor to waive any provision of this section. (f) The Legislature hereby declares that the provisions of this section are of statewide concern and are necessary to encourage full participation by contractors and subcontractors in public contract procedures.
(g) The escrow agreement used hereunder shall be null, void, and unenforceable unless it is substantially similar to the following form:
ESCROW AGREEMENT FOR
SECURITY DEPOSITS IN LIEU OF RETENTION
This Escrow Agreement is made and entered into by and between whose address is
hereinafter called “Owner,”
whose address is
hereinafter called “Contractor” and
whose address is
Exhibit A
CD-30
06/2026/A26-0119/BidDocs
hereinafter called “Escrow Agent.”
For the consideration hereinafter set forth, the Owner, Contractor, and Escrow Agent agree as follows:
(1) Pursuant to Section 22300 of the Public Contract Code of the State of California, Contractor has the option to deposit securities with Escrow Agent as a substitute for retention earnings required to be withheld by Owner pursuant to the Construction Contract entered into between the Owner and Contractor for ____ in the amount of ____ dated ____ (hereinafter referred to as the “Contract”). Alternatively, on written request of the Contractor, the Owner shall make payments of the retention earnings directly to the Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the Owner within 10 days of the deposit. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract between the Owner and Contractor. Securities shall be held in the name of ____, and shall designate the Contractor as the beneficial owner. (2) The Owner shall make progress payments to the Contractor for those funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above. (3) When the Owner makes payment of retentions earned directly to the Escrow Agent, the Escrow Agent shall hold them for the benefit of the Contractor until the time that the escrow created under this contract is terminated. The Contractor may direct the investment of the payments into securities. All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the Owner pays the Escrow Agent directly.
(4) Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering the Escrow Account and all expenses of the Owner. These expenses and payment terms shall be determined by the Owner, Contractor, and Escrow Agent. (5) The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the Owner. (6) Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from the Owner to the Escrow Agent that Owner consents to the withdrawal of the amount sought to be withdrawn by Contractor.
Exhibit A
CD-31
06/2026/A26-0119/BidDocs
(7) The Owner shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven days’ written notice to the Escrow Agent from the owner of the default, the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by the Owner.
(8) Upon receipt of written notification from the Owner certifying that the Contract is final and complete, and that the Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges.
(9) Escrow Agent shall rely on the written notifications from the Owner and the Contractor pursuant to Sections (5) to (8), inclusive, of this Agreement and the Owner and Contractor shall hold Escrow Agent harmless from Escrow Agent’s release and disbursement of the securities and interest as set forth above.
(10) The names of the persons who are authorized to give written notice or to receive written notice on behalf of the Owner and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows:
On behalf of Owner: On behalf of Contractor:
Title Title
Name Name
Signature Signature
Address Address
On behalf of Escrow Agent:
Exhibit A
CD-32
06/2026/A26-0119/BidDocs
Title
Name
Signature
Address
At the time the Escrow Account is opened, the Owner and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Agreement.
IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above.
Owner Contractor
Title Title
Name Name
Signature Signature
Exhibit A
CD-33
06/2026/A26-0119/BidDocs
Public Contract Code Section 9204
(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section:
(1) "Claim" means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled.
(C) Payment of an amount that is disputed by the public entity. (2) "Contractor" means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) "Public entity" means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, CITY, special CITY, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.
(B) "Public entity" shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department.
(ii) The Department of Transportation as to any project under the jurisdiction of that department.
The Department of Parks and Recreation as to any project under the jurisdiction of that department.
Exhibit A
CD-34
06/2026/A26-0119/BidDocs
(iii) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(iv) The Military Department as to any project under the jurisdiction of that department.
(v) The Department of General Services as to all other projects. (vi) The High-Speed Rail Authority.
(4) "Public works project" means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.
(5) "Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45- day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion.
(D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. (B) (A) If the claimant disputes the public entity's written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute Within 10 business days following the conclusion of the meet and confer conference,
Exhibit A
CD-35
06/2026/A26-0119/BidDocs
if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties' dispute. (2) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity's failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(3) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(4) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the
Exhibit A
CD-36
06/2026/A26-0119/BidDocs
public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.
(i) This section shall remain in effect only until January 1, 2020, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date.
- END OF CONTRACT DOCUMENTS -
Exhibit A
06/2026/A26-0119/BidDocs
GC 1
GENERAL CONDITIONS
Exhibit A
06/2026/A26-0119/BidDocs
GC 2
GENERAL CONDITIONS
ARTICLE 1 -- DEFINITIONS
Wherever used in these General Conditions or in the other Contract Documents the following terms have the meanings indicated which are applicable to both the singular and plural thereof.
Where an entire word is capitalized in the definitions and is found un-capitalized in the Contract Documents it has the ordinary dictionary definition.
Addenda - Written or graphic instruments issued prior to the opening of Bids which make additions, deletions or revisions to the Contract Documents.
Agent - CONSTRUCTION MANAGER is the Agent of OWNER.
Agreement - The written contract between OWNER and CONTRACTOR covering the WORK to be performed; other documents are attached to the Agreement and made a part thereof as provided therein.
Allowance - A Bid item that adds a specified quantity of WORK to the Agreement work scope which OWNER may unilaterally direct CONTRACTOR to perform, or elect not to have performed.
Application for Payment - The form furnished by CONSTRUCTION MANAGER which is to be used by CONTRACTOR to request progress or Final Payment and which is to be accompanied by such supporting documentation as is required by the Contract Documents.
Asbestos - Any material that contains more than one (1) percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration (“OSHA”).
Beneficial Occupancy - Use by OWNER of the WORK prior to final acceptance.
Bidder - Any individual, firm, partnership, corporation or combination thereof, submitting a Bid for the WORK, acting directly or through a duly authorized representative.
Bid - The offer or proposal of the Bidder submitted on the prescribed form setting forth the price or prices for the WORK.
Bidding Documents - The advertisement or Invitation to Bid, Instructions to Bidders, the Bid form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids).
Bonds - Bid, Performance and Payment Bonds and other instruments, which protect against loss due to inability or refusal of CONTRACTOR to perform its contract.
Exhibit A
06/2026/A26-0119/BidDocs
GC 3
Change Order - A document recommended by CONSTRUCTION MANAGER, which is signed by CONTRACTOR and OWNER and authorizes an addition, deletion or revision in the WORK, or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement.
CITY - OWNER (See OWNER’s definition in this section).
City of El Centro - OWNER (See OWNER’s definition in this section).
Claim - A dispute becomes a Claim only after CONTRACTOR receives and refuses to accept CONSTRUCTION MANAGER’s initial determination, and is certified as required by Article
16.3. Codes - The terms Government Code, Labor Code, etc. refer to codes of the State of California.
CONSTRUCTION MANAGER - The individual, partnership, corporation, joint venture or other legal entity named as such by written notice from OWNER.
Construction Manager Order - A written order issued by CONSTRUCTION MANAGER which clarifies or interprets the Procurement Documents or orders minor changes or alterations in the scope of WORK to be furnished but which does not involve a change in the Contract Price or the Contract Time.
Contract Documents - The Notice Inviting Bids, Instructions to Bidders, Bid forms (including the Bid, Bid schedule(s), information required of Bidder, Bid bond, and all required certificates and affidavits), Agreement, Performance Bond, Payment Bond, General Conditions, Supplementary General Conditions, SPECIAL PROVISIONS, Drawings and all Addenda, and Change Orders executed pursuant to the provisions of the Contract Documents.
Contract Milestone - A principal event specified in the Contract Documents relating to an intermediate completion date of a portion of the WORK, or a period of time within which the portion of the WORK should be performed prior to Substantial Completion of all the WORK.
Contract Price - The total monies payable by OWNER to CONTRACTOR under the terms and conditions of the Contract Documents.
Contract Time - The number of successive calendar Days stated in the Contract Documents for the completion of the WORK.
CONTRACTOR - The individual, partnership, corporation, joint venture or other legal entity with whom OWNER has executed the Agreement.
Day - A calendar day of twenty-four (24) hours measured from midnight to the next midnight.
Defective Work - Work that is unsatisfactory, faulty or deficient; or that does not conform to the Contract Documents; or that does not meet the requirements of any inspection, reference standard,
Exhibit A
06/2026/A26-0119/BidDocs
GC 4
test or approval referred to in the Contract Documents; or work that has been damaged by anyone other than OWNER prior to CONSTRUCTION MANAGER’s recommendation of final payment.
DESIGN CONSULTANT - The individual, partnership, corporation, joint venture or other legal entity named as such in the Contract Documents or succeeding entity.
Demobilization - The complete dismantling and removal by CONTRACTOR of all of CONTRACTOR’s temporary facilities, equipment and personnel at the site.
Drawings - The drawings, plans, maps, profiles, diagrams and other graphic representations which indicate the character, location, nature, extent and scope of the WORK and which have been prepared by DESIGN CONSULTANT and are referred to in the Contract Documents. Shop Drawings are not Drawings as so defined.
Disputed Work - A dispute exists from the time CONTRACTOR disagrees with a decision or determination made by CONSTRUCTION MANAGER until CONSTRUCTION MANAGER renders an initial determination. If the issue is unresolved it becomes a Claim.
Effective Date of the Agreement - The date indicated in the Agreement on which it becomes effective, but if no such date is indicated it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver.
Engineer - Wherever the word Engineer is found in these Contract Documents or in any referenced document, it shall mean CONSTRUCTION MANAGER.
Field Order - A written order issued by OWNER which changes the Agreement WORK scope and involves a change in the Contract Price or Contract Time or the intent of the Agreement.
Final Payment - is defined as the last progress payment made to CONTRACTOR for earned funds, less retainage as applicable, less deductions listed in Article 14. CONTRACTOR is entitled to this payment when the Notice of Completion is issued.
General Conditions - Section General Conditions of the Contract Specification.
Hazardous Waste - The term Hazardous Waste shall have the meaning provided in Section 104 of the Solid Waste Disposal Act (42 USC Section 6903) as amended from time to time or, as defined in section 25117 of the Health and Safety Code, that is required to be removed to a class I, class II or class III disposal site in accordance with provisions of existing law, whichever is more restrictive.
Exhibit A
06/2026/A26-0119/BidDocs
GC 5
Holidays - Legal Holidays observed by OWNER occur on:
New Year’s Day - January 1
Martin Luther King’s Birthday - Third (3rd) Monday in January President’s Day - Third (3rd) Monday in February
Good Friday – The afternoon of the Friday before Easter Memorial Day - Last Monday in May
Juneteenth – June 19
Independence Day - July 4
Labor Day - First (1st) Monday in September
Veteran’s Day - November 11
Thanksgiving Day - Fourth (4th) Thursday in November
The Day after Thanksgiving – The Friday after the fourth (4th) Thursday in November Christmas Eve – The afternoon of December 24
Christmas Day - December 25
New Years Eve – The afternoon of December 31
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday are both legal Holidays. If the Holiday should fall on a Sunday, Sunday and the following Monday are both legal Holidays.
Interfacing Work - Work which connects to, abuts or meets with work of another contractor.
Laws and Regulations - Any and all applicable laws, rules, regulations, ordinances, codes and/or orders of any and all governmental bodies, agencies, authorities and courts having jurisdiction.
Lump Sum Work - Work to be paid on the basis of lump sum prices.
Mechanic’s Lien - A form of security, an interest in real property, which is held to secure the payment of an obligation. When referred to in these Contract Documents, Mechanic’s Lien or lien means Stop Notice.
Milestone - See Contract Milestone.
Mobilization - The establishment by CONTRACTOR of the temporary facilities, equipment and personnel at the site thereby enabling the WORK to commence.
Notice of Award - The written notice by OWNER to the apparent low Bidder stating that upon compliance by the apparent low Bidder with the conditions precedent enumerated therein within the time specified, OWNER will enter into an Agreement.
Notice of Completion - A form signed by DESIGN CONSULTANT, CONSTRUCTION MANAGER and CONTRACTOR recommending to OWNER that the WORK is complete and fixing the date of completion. After acceptance of the WORK by OWNER’s governing body, the form is signed by OWNER and filed with the County Recorder. This filing starts the thirty (30) Day lien filing period on the WORK.
Exhibit A
06/2026/A26-0119/BidDocs
GC 6
Notice to Proceed - The written notice issued by OWNER to CONTRACTOR authorizing CONTRACTOR to proceed with the WORK and establishing the date of commencement of the Contract Time.
OWNER’s Agent - CONSTRUCTION MANAGER is OWNER’s Agent.
OWNER - The City of El Centro, acting through its legally designated officials, officers or employees.
Partial Utilization - Use by OWNER of a substantially completed part of the WORK for the purpose for which it is intended prior to Substantial Completion of all the WORK. (See Beneficial Occupancy)
PCBs - Polychlorinated biphenyls.
Petroleum - Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (sixty (60) degrees Fahrenheit and fourteen and seventenths (14.7) pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene and oil mixed with other non-Hazardous Wastes and crude oils.
Project - The total construction of which the WORK to be provided under the Contract Documents may be the whole, or a part as indicated elsewhere in the Contract Documents.
Radioactive Material - Source, special nuclear or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Sections 2011 et seq.) as amended from time to time.
Request for Information - The standardized form furnished by OWNER for CONTRACTOR’s use when making written requests for information to CONSTRUCTION MANAGER, and upon which the response will be answered and returned.
Request for Proposal - The standardized form used by CONSTRUCTION MANAGER to request a proposal from CONTRACTOR for proposed changes in the WORK.
Samples - Physical examples of materials, equipment or workmanship that are representative of some portion of the WORK and which establish the standards by which such portion of the WORK will be judged.
Safety - Safety includes health and security.
Shop Drawings - All drawings, diagrams, illustrations, schedules and other data which are specifically prepared by or for CONTRACTOR and submitted by CONTRACTOR to illustrate some portion of WORK and all illustrations, brochures, standard schedules, performance charts, instructions and diagrams to illustrate material or equipment for some portion of the WORK.
Exhibit A
06/2026/A26-0119/BidDocs
GC 7
Specifications – The directions, provisions and requirements contained in the Bidding Documents, contract forms, conditions of the Agreement and the SPECIAL PROVISIONS, as listed in the Table of Contents.
Stop Notice - A legal remedy for Subcontractors and Suppliers who contribute to public works, but who are not paid for their work, which secures payment from construction funds possessed by OWNER. For public property, the Stop Notice remedy is designed to substitute for Mechanic’s Lien rights.
Submittals - The information which is specified for submission to CONSTRUCTION MANAGER in accordance with Article 6.20 of the General Conditions.
Sub-Consultant - The individual, partnership, corporation, joint venture or other legal entity having a direct contract with DESIGN CONSULTANT, CONSTRUCTION MANAGER or with any of their consultants to furnish services with respect to the Project and who is identified as such in the Supplementary General Conditions.
Subcontractor - An individual, partnership, corporation, joint venture or other legal entity having a direct contract with CONTRACTOR or with any other Subcontractor for the performance of a part of the WORK at the site.
Substantial Completion - Refers to when the WORK has progressed to the point where, in the opinion of CONSTRUCTION MANAGER as evidenced by Notice of Completion as applicable, it is sufficiently complete, in accordance with the Contract Documents, so that the WORK can be utilized for the purposes for which it is intended, and after the operation demonstration is complete, where applicable.
SPECIAL PROVISIONS – That section of the Contract Documents consisting of written technical descriptions of products and execution of the WORK.
Supplementary General Conditions - The part of the Contract Documents which make additions, deletions or revisions to these General Conditions.
Supplier - A manufacturer, fabricator, supplier, distributor, material worker or vendor.
Underground Utilities - All pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments, and any encasement containing such facilities which have been installed underground to furnish any of the following services or materials: electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems or water.
Unit Price Work - Specific WORK scope included in the Agreement WORK scope to be paid for on the basis of unit prices. OWNER may unilaterally direct CONTRACTOR to perform the WORK, or elect not to have the WORK performed.
Exhibit A
06/2026/A26-0119/BidDocs
GC 8
WORK - The entire completed construction or the various separately identifiable parts thereof required to be furnished under the Contract Documents. WORK is the result of performing or furnishing labor and furnishing and incorporating materials and equipment into the construction, and performing or furnishing services and furnishing documents, all as required by the Contract Documents.
Work Change Directive - A written directive to CONTRACTOR, issued on or after the Effective Date of the Agreement and recommended by CONSTRUCTION MANAGER, and signed by OWNER ordering an addition, deletion or revision in the WORK, or responding to differing or unforeseen physical conditions under which the WORK is to be performed or to emergencies. A Work Change Directive will not change the Contract Price or the Contract Time, but is evidence that the parties expect that the change directed or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Time.
ARTICLE 2 -- PRELIMINARY MATTERS
2.1 DELIVERY OF BONDS/INSURANCE CERTIFICATES - When CONTRACTOR delivers the signed Agreements to OWNER, CONTRACTOR shall also deliver to OWNER such Bonds and Insurance Policies and Certificates as CONTRACTOR may be required to furnish in accordance with the Contract Documents.
2.2 COPIES OF DOCUMENTS - OWNER shall furnish to CONTRACTOR ten (10) copies of the Contract Documents as specified in the Agreement and ten (10) sets of full-scale Drawings.
Additional quantities of the Contract Documents will be furnished at reproduction cost.
2.3 COMMENCEMENT OF CONTRACT TIME; NOTICE TO PROCEED - The Contract Time will start to run on the commencement date stated in the Notice to Proceed.
2.4 STARTING THE WORK - CONTRACTOR shall begin to perform the WORK within ten (10) Days after the commencement date stated in the Notice to Proceed, but no work shall be done at the site prior to said commencement date. In addition, any requirements in the Supplemental General Conditions must be satisfied.
2.5 CONTRACTOR MUST STUDY CONTRACT DOCUMENTS - Before undertaking each part of the WORK, CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements.
CONTRACTOR shall promptly report in writing to CONSTRUCTION MANAGER any conflict, error or discrepancy which CONTRACTOR may discover and shall obtain a written interpretation or clarification from CONSTRUCTION MANAGER before proceeding with any work affected thereby.
2.6 PRELIMINARY SUBMITTALS - Preliminary submittals shall be provided to CONSTRUCTION MANAGER in accordance with Division 1 requirements.
Exhibit A
06/2026/A26-0119/BidDocs
GC 9
2.7 PRECONSTRUCTION CONFERENCE - CONTRACTOR is required to attend a preconstruction conference. This conference will be attended by CONSTRUCTION MANAGER and others as appropriate in order to discuss the WORK in accordance with the applicable procedures specified in the General Requirements.
CONTRACTOR is required to schedule and attend a preconstruction conference with the Imperial Irrigation District (“IID”) prior to the construction or demolition of any electrical improvements.
2.8 SUBCONTRACTOR MOBILIZATION MEETING - Prior to the start of each major Subcontractor’s site work, CONTRACTOR, the involved Subcontractor and CONSTRUCTION MANAGER shall attend a pre-start meeting to discuss the schedule, coordination, procedures and other administrative issues.
2.9 CONTRACTOR DUTY TO ADVISE OWNER OF KNOWN OR DISCOVERED PROBLEMS - CONTRACTOR is reminded of his obligation to advise OWNER of any errors and/or omissions in the Contract Documents, or changes to thereof, which CONTRACTOR may be aware through special knowledge or discovered during the Bid process.
ARTICLE 3 -- CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE
3.1 INTENT - The Contract Documents comprise the entire agreement between OWNER and CONTRACTOR concerning the WORK. The Contract Documents are complementary; what is called for by one is as binding as if called for by all. The Contract Documents will be construed in accordance with the law of the place of the WORK.
3.2 INTENT OF WORK TO BE FUNCTIONALLY COMPLETE
3.2.1 Work to be Complete - It is the intent of the Contract Documents to describe the WORK to be constructed in accordance with the Contract Documents. Any work, materials or equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the intended result shall be supplied whether or not specifically called for or identified in the Contract Documents. When words or phrases which have a wellknown technical or construction industry or trade meaning are used to describe work, materials or equipment, such words or phrases shall be interpreted in accordance with that meaning unless a definition has been provided in Article 1 of the General Conditions.
3.2.2 Necessary Utilities - If utilities to equipment/fixtures are not shown but are necessary to operate the equipment/fixtures, the utilities service installation is considered to be part of the WORK. The implied WORK will conform to the appropriate sections of the technical Specifications.
3.3 CLARIFICATIONS AND INTERPRETATIONS OF THE CONTRACT DOCUMENTS
3.3.1 Referenced Standards - Reference to standard specifications, manuals or Codes of any technical society, organization or association or to the laws or regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard
Exhibit A
06/2026/A26-0119/BidDocs
GC 10
specification, manual, code or laws or regulations in effect at the time of opening of Bids, except as may be otherwise specifically stated. However, no provision of any referenced standard specification, manual or code shall be effective to change the duties and responsibilities of OWNER, CONTRACTOR or CONSTRUCTION MANAGER or any of their consultants, agents or employees from those set forth in the Contract Documents.
3.3.2 Discovery of Problem Notice - If, during the performance of the WORK, CONTRACTOR discovers any conflict, error, ambiguity or discrepancy with the WORK within the Contract Documents or between the Contract Documents and any provision of any such Laws and Regulations applicable to the performance of the WORK or of any such standard, specification, manual or code or of any instruction of any Supplier, CONTRACTOR shall report it to CONSTRUCTION MANAGER in writing within seven (7) calendar Days of discovery.
CONTRACTOR shall not proceed with the WORK affected thereby, except in an emergency, unless directed by CONSTRUCTION MANAGER. Any WORK performed by CONTRACTOR that is not directed by CONSTRUCTION MANAGER shall be at its own risk.
3.3.3 Order of Precedence of Contract Documents - In resolving conflicts resulting from errors or discrepancies in any of the Contract Documents, the order of precedence shall be as follows:
3.3.3.1 Permits from other agencies as may be required by law.
3.3.3.2 Change Orders
3.3.3.3 Agreement
3.3.3.4 Addenda
3.3.3.5 CONTRACTOR’s Bid (Bid Form)
3.3.3.6 Notice Inviting Bids
3.3.3.7 Instructions to Bidders
3.3.3.8 Supplementary General Conditions
3.3.3.9 General Conditions
3.3.3.10 SPECIAL PROVISIONS
3.3.3.11 Drawings
3.3.3.12 Referenced Standard Specifications
3.3.4 Order of Precedence of the Drawings - With reference to the Drawings the order of precedence is as follows:
Exhibit A
06/2026/A26-0119/BidDocs
GC 11
3.3.4.1 Figures govern over scaled dimensions
3.3.4.2 Detail drawings govern over general drawings
3.3.4.3 Addenda/Change Order drawings govern over Contract Drawings
3.3.4.4 Contract Drawings govern over standard drawings
3.4 AMENDING AND SUPPLEMENTING CONTRACT DOCUMENTS
3.4.1 Amending Contract Documents - The Contract Documents may be amended to provide for additions, deletions and revisions in the WORK or to modify the terms and conditions thereof by a Change Order pursuant to Article 10.
3.4.2 Supplementing Contract Documents - The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the WORK may be authorized, by:
3.4.2.1 - A Construction Manager Order issued by CONSTRUCTION MANAGER.
3.4.2.2 - DESIGN CONSULTANT’s approval of a Shop Drawing or Sample pursuant to Article 6 3.4.2.3 - DESIGN CONSULTANT’s written interpretation or clarification
3.5 REUSE OF DOCUMENTS - Neither CONTRACTOR, nor any Subcontractor or Supplier, nor any other person or organization performing any of the WORK under a contract with OWNER shall have or acquire any title to or ownership rights in any of the Drawings, technical Specifications or other documents used on the WORK, and they shall not reuse any of them on the extensions of the Project or any other project without written consent of OWNER.
ARTICLE 4 -- AVAILABILITY OF LANDS; PHYSICAL CONDITIONS; REFERENCE POINTS
4.1 AVAILABILITY OF LANDS - OWNER shall furnish, as indicated in the Contract Documents, the lands upon which the WORK is to be performed, rights-of-way and easements for access thereto, and such other lands which are designated for the use of CONTRACTOR.
Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by OWNER, unless otherwise provided in the Contract Documents. Nothing contained in the Contract Documents shall be interpreted as giving CONTRACTOR exclusive occupancy of the lands or rights-of-way provided. CONTRACTOR shall provide, at no additional cost, for all additional lands and access thereto that may be required for temporary construction facilities, borrow areas, waste disposal areas or storage of materials and equipment; provided that CONTRACTOR shall not enter upon nor use any property not under the control of OWNER until a written temporary construction easement agreement has been executed by CONTRACTOR and the property owner, and a copy of said easement furnished to CONSTRUCTION MANAGER prior to said use; and, neither OWNER nor CONSTRUCTION MANAGER shall be liable for any
Exhibit A
06/2026/A26-0119/BidDocs
GC 12
claims or damages resulting from CONTRACTOR’s unauthorized trespass or authorized use of any such properties.
4.2 PHYSICAL SITE CONDITIONS
4.2.1 Reports and Drawings - Reference is made to the Supplementary General Conditions for identification of:
4.2.1.1 Subsurface Condition Reports - Those reports of explorations and tests of subsurface conditions at or contiguous to the site that have been utilized by DESIGN CONSULTANT in preparing the Contract Documents; and
4.2.1.2 Drawings of Existing Structures - Reference is made to the Supplementary General Conditions for identification of those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Utilities referred to in section 4.4 of Article 4 herein) which are at or contiguous to the site that have been utilized in the preparation of the Contract Documents.
4.2.2 Limited Reliance By CONTRACTOR On The Technical Data - CONTRACTOR may rely upon the accuracy of the technical data contained in such drawings or reports, however, nontechnical data, interpretations and opinions contained in such drawings or reports are not to be relied on by CONTRACTOR. CONTRACTOR may not rely upon or make any claims against OWNER, DESIGN CONSULTANT or CONSTRUCTION MANAGER with respect to:
4.2.2.1 the completeness of such reports and drawings for CONTRACTOR’s purposes, including, but not limited to, any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and Safety precautions and programs incident thereto, or
4.2.2.2 other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings, or
4.2.2.3 any CONTRACTOR interpretation of or conclusion drawn from any technical data or any such data, interpretations, opinions or information.
4.3 DIFFERING SITE CONDITIONS - If CONTRACTOR believes that any subsurface or physical condition at or contiguous to the site that is uncovered or revealed either:
4.3.1 is of such a nature as to establish that any technical data on which CONTRACTOR is entitled to rely as provided in paragraphs 4.2.1 is materially inaccurate, or
4.3.2 is of such a nature as to require a change in the Contract Documents, or
4.3.3 differs materially from that shown or indicated in the Contract Documents, or
Exhibit A
06/2026/A26-0119/BidDocs
GC 13
4.3.4 is of an unusual nature and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents, CONTRACTOR shall immediately report it to CONSTRUCTION MANAGER then CONTRACTOR shall, promptly after becoming aware thereof and before further disturbing conditions thereby or performing any work in connection therewith (except in an emergency as permitted by paragraph 6.23), notify OWNER and CONSTRUCTION MANAGER in writing about such condition. CONTRACTOR shall not further disturb such conditions or perform any work in connection therewith (except as aforesaid) until receipt of written order to do so.
4.3.5 OWNER Responsibility - OWNER shall promptly investigate the conditions, and if it finds that the conditions do materially so differ and cause a decrease or increase in CONTRACTOR’s cost of, or the time required for, performance of any part of the WORK, OWNER shall issue a Change Order under the procedures described in Article 10. If OWNER determines that there is no bona fide work scope change or is a minor change which does not impact time or cost, OWNER shall notify CONTRACTOR of this finding within thirty (30) Days.
4.3.6 Disputed Work – If CONTRACTOR and OWNER are unable to reach agreement on Disputed Work, OWNER may direct CONTRACTOR to proceed with the WORK. Payment shall be as later directed, by mediation or arbitration, if OWNER and CONTRACTOR agree thereto, or as fixed in a court of law.
Although not to be construed as proceeding under extra work provisions, CONTRACTOR shall keep and furnish records of Disputed Work in accordance with 11.3.
4.3.7 Disallowance of Entitlement - CONTRACTOR shall not be entitled to any adjustment in the Contract Price or Contract Time or will be deemed to have waived his right to such a claim if:
4.3.7.1 CONTRACTOR knew of the existence of such conditions at the time CONTRACTOR made a final commitment to OWNER in respect of Contract Price and Contract Time by the submission of a Bid or becoming bound under the Agreement; or
4.3.7.2 the existence of such condition could reasonably have been discovered or revealed as a result of any examination, investigation of the site and contiguous areas suggested or required by the Bidding Documents: or
4.3.7.3 CONTRACTOR failed to give the written notice within the time and as required by Article
3.3.2. 4.4 UNDERGROUND UTILITIES
4.4.1 Utilities Indicated - The information and data indicated in the Contract Documents with respect to existing Underground Utilities at or contiguous to the site are based on information and data furnished to OWNER or CONSTRUCTION MANAGER by the owners of such Underground Utilities or by others. Unless it is expressly provided in the Supplementary General Conditions and/or the General Conditions, OWNER and CONSTRUCTION MANAGER shall not be responsible for the accuracy or completeness of any such information or data, and CONTRACTOR
Exhibit A
06/2026/A26-0119/BidDocs
GC 14
shall have full responsibility for reviewing and checking all such information and data, for locating all Underground Utilities indicated in the Contract Documents, for coordination of the WORK with the owners of such Underground Utilities during construction, for the Safety and protection thereof and repairing any damage thereto resulting from the WORK, the cost of which will be considered as having been included in the Contract Price.
4.4.2 Utilities Not Indicated - If Underground Utilities are uncovered or revealed at or contiguous to the site which was not indicated in the Contract Documents and which CONTRACTOR could not reasonably have been expected to be aware of, CONTRACTOR shall identify the owner of such Underground Utilities and give written notice thereof to that owner and shall notify CONSTRUCTION MANAGER in accordance with the requirements of the General Conditions and General Requirements.
4.4.3 Action Prior To Starting Work - As provided in section 4216 of the California Government Code, at least two (2) working Days prior to commencing any excavation, CONTRACTOR shall contact the regional notification center (Underground Service Alert of Southern California) and obtain an inquiry identification number.
4.4.4 Locate Utilities - CONTRACTOR shall determine the location and depth of all utilities, including service connections, which have been marked by the respective owners and which may affect or be affected by its operations. Full compensation for such work shall be considered as included in CONTRACTOR’s Bid price.
4.4.5 Protection Of Utilities - CONTRACTOR shall not interrupt the service function or disturb the support of any utility, without authority from OWNER or order from the utility owner. All valves, switches, vaults and meters shall be maintained readily accessible for emergency shutoff.
Where protection is required to ensure support of utilities located as shown on the Plans, CONTRACTOR shall, unless otherwise provided, furnish and place the necessary protection at its expense.
4.4.6 Notification Requirements If Utility Disturbed - CONTRACTOR shall immediately notify CONSTRUCTION MANAGER and utility owner if any utility is disturbed or damaged.
CONTRACTOR shall bear the costs of repair or replacement of any utility damaged by CONTRACTOR.
4.4.7 Removal Of Abandoned Utilities - Unless otherwise specified, CONTRACTOR shall remove all interfering portions of utilities shown on the Plans or indicated in the Bidding Documents as abandoned. Before starting removal operations, CONTRACTOR shall ascertain from the Utility Owner whether the abandonment is complete. The costs involved in the removal and disposal shall be included in the price for the item of work necessitating such removals.
4.4.8 Relocation Of Utilities
4.4.8.1 When the Plans or Specifications provide for CONTRACTOR to alter, relocate or reconstruct a utility, all costs for such work shall be included in the Bid.
Exhibit A
06/2026/A26-0119/BidDocs
GC 15
4.4.8.2 Temporary or permanent relocation or alteration of indicated utilities requested by CONTRACTOR for its convenience shall be its responsibility, and CONTRACTOR shall make all arrangements and bear all costs.
4.4.8.3 After award of the Agreement, portions of utilities not indicated in the Contract Documents which are found to interfere with the WORK may be relocated, altered or reconstructed by the utility owner, or CONSTRUCTION MANAGER may order changes in the WORK to avoid interference. Such changes will be paid for in accordance with Article 10.
4.4.9 Delays
4.4.9.1 CONTRACTOR shall immediately notify in writing the utility owner and CONSTRUCTION MANAGER of its construction schedule and any subsequent changes in the construction schedule which will affect the time available for protection, removal or relocation of utilities.
4.4.9.2 CONTRACTOR will not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if correctly located, as noted in the Contract Documents.
4.4.9.3 CONTRACTOR may be given a no cost extension of time for unforeseen delays attributable to unreasonably protracted interferences by others in the relocation of utilities.
4.4.10 Access to the WORK - When necessary, CONTRACTOR shall so conduct its operations as to permit access to the WORK site and provide time for utility work to be accomplished during normal work hours during the progress of the WORK.
4.5 REFERENCE POINTS
4.5.1 Bench Mark - The CONSTRUCTION MANAGER will provide one (1) benchmark, near or on the site of the WORK, and will provide two (2) points near or on the site to establish a base line for use by CONTRACTOR for alignment control. Unless otherwise specified in the General Requirements, CONTRACTOR shall furnish all other lines, grades and benchmarks required for proper execution of the WORK.
4.5.2 Protection of Bench Marks - CONTRACTOR shall preserve all bench marks, stakes and other survey marks, and in case of their removal or destruction by any party, CONTRACTOR shall be responsible for the accurate replacement of such reference points by personnel qualified under Division 3, Chapter 15 of the California Business and Professions Code. CONTRACTOR shall report to CONSTRUCTION MANAGER whenever a reference point is lost, destroyed or requires relocation.
4.6 ASBESTOS, PCBS, PETROLEUM, HAZARDOUS WASTE OR RADIOACTIVE
MATERIAL
Exhibit A
06/2026/A26-0119/BidDocs
GC 16
4.6.1 OWNER Responsibility - OWNER shall be responsible for any hazardous material which includes hazardous substances and hazardous waste as defined by sections 25316 and 25117 of the Health and Safety Code, uncovered or revealed at the site which was not identified in the Contract Documents to be within the scope of the WORK. OWNER shall not be responsible for any such materials brought to the site by CONTRACTOR, Subcontractors, Suppliers or anyone else for whom CONTRACTOR is responsible.
4.6.2 CONTRACTOR’s Responsibility - When such hazardous material is encountered, CONTRACTOR shall immediately stop all work in connection with such hazardous condition in any area affected thereby (except in an emergency as required by Article 6) and notify OWNER and CONSTRUCTION MANAGER in writing. OWNER shall promptly evaluate such hazardous condition and take corrective action. CONTRACTOR shall not be required to resume work in any such affected area until after OWNER has delivered to CONTRACTOR written notice specifying that such condition and any affected area has been rendered safe for the reassumption of work, or specifying any special conditions under which such work may be resumed safely.
4.6.3 Dispute - If, after receipt of such special written notice, CONTRACTOR does not agree to resume work based on a reasonable belief it is unsafe, or does not agree to resume work under such special conditions, then OWNER may order such portion of the work that is in connection with such hazardous condition or in such affected area to be deleted from the WORK. OWNER may have such deleted portion of the work performed by OWNER’s own forces or others in accordance with Article 7. If OWNER and CONTRACTOR cannot agree as to entitlement to or the amount or extent of an adjustment, if any, in Contract Price or Contract Time as a result of work stoppage or of deleting such portion of the WORK, then either party may make a Claim as provided in Article 16.
4.6.4 OWNER Hold Harmless - To the fullest extent permitted by Laws and Regulations, OWNER shall indemnify and hold harmless CONTRACTOR, Subcontractors, CONSTRUCTION MANAGER, DESIGN CONSULTANT and the officers, directors, employees, agents, other consultants and Subcontractors of each and any of them from and against all claims, costs, losses and damages arising out of or resulting from such hazardous condition, provided that any such claim, cost, loss or damage is attributable to bodily injury, sickness, disease or death or to the destruction of tangible property and provided further that any such claim, cost loss or damage is not caused by the consequences of that person’s or entity’s own negligence.
ARTICLE 5 -- BONDS AND INSURANCE
5.1 PERFORMANCE, PAYMENT AND OTHER BONDS
5.1.1 Bond Requirement - CONTRACTOR shall furnish Performance and Payment Bonds, each in the amount set forth in the Supplementary General Conditions as security for the faithful performance and payment of all CONTRACTOR’s obligations under the Contract Documents.
These Bonds shall remain in effect at least until one (1) year after the filing date of Notice of Completion, except as otherwise provided by law or regulation or by the Contract Documents.
CONTRACTOR shall also furnish such other Bonds as are required by the Supplementary General Conditions.
Exhibit A
06/2026/A26-0119/BidDocs
GC 17
5.1.2 Licensed Surety - All Bonds shall be in the form prescribed by the Contract Documents and by such sureties which are admitted insurers in the State of California and are subject to regulation by the Department of Insurance, and which also satisfy the requirements stated in section 995.660 of the Code of Civil Procedure, except as provided otherwise by Laws or Regulations. All Bonds signed by an agent must be accompanied by a certified copy of such agent’s authority to act. Surety companies must be duly licensed or authorized in the jurisdiction in which the Project is located to issue Bonds for the limits so required. Such surety companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary General Conditions.
5.1.3 Bankrupt or Insolvent Surety - If the surety on any Bond furnished by CONTRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the WORK is located, CONTRACTOR shall within seven (7) Days thereafter substitute another Bond and Surety, which must be acceptable to OWNER per paragraph 5.1.1 and
5.1.2 above.
5.2 INSURANCE
5.2.1 Insurance Policy Requirements - CONTRACTOR shall purchase and maintain the insurance required under the Construction Services Agreement.
5.2.7 Subcontractor’s Insurance - CONTRACTOR shall either require each of its Subcontractors to procure and to maintain public liability and property damage insurance and vehicle liability insurance of the type and in the amounts specified for CONTRACTOR in the Supplementary General Conditions or insure the activities of its Subcontractors in CONTRACTOR’s own policy, in like amount.
5.2.9 Restriction on Start of Site Work - CONTRACTOR shall not perform any WORK unless CONTRACTOR has in full force and effect all required insurance. CONTRACTOR shall not allow any Subcontractor, Supplier or other organization to perform WORK unless the Workers’ Compensation requirements have been met.
5.2.10 Increasing Insurance Limits - OWNER may direct CONTRACTOR to increase insurance limits. CONTRACTOR will be entitled to a Contract Price adjustment based on the substantiated premium costs.
ARTICLE 6 -- CONTRACTOR’S RESPONSIBILITIES
6.1. Responsibility Of CONTRACTOR To Perform - Unless otherwise specified in the Contract Documents, CONTRACTOR shall furnish and assume full responsibility for all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities and all other facilities and incidentals necessary for the furnishing, performance, testing, start-up and completion of the WORK. Such support that may need to be provided after normal working hours will be provided by CONTRACTOR at its expense.
Exhibit A
06/2026/A26-0119/BidDocs
GC 18
6.2 Labor, Materials and Equipment All materials and equipment to be incorporated into the WORK shall be of good quality and new, except as otherwise provided in the Contract Documents.
All warranties and guarantees specifically called for by the Specifications shall expressly run to the benefit of OWNER. If required by CONSTRUCTION MANAGER, CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the kind and quality of materials and equipment. All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable Supplier except as otherwise provided in the Contract Documents; but no provisions of any such instructions will be effective to assign to CONSTRUCTION MANAGER, any duty or authority to supervise or direct the furnishing or performance of the WORK.
6.2.1 The completed work shall include all necessary permanent Safety devices, such as machinery guards, emergency stops and similar Safety items required by OSHA, Cal-OSHA and other Federal, State and local health and Safety regulations. In addition, all equipment, products, components and/or package systems shall be designed, fabricated and installed in compliance with Seismic Zone 4 structural criteria. Further, any features of the work (including OWNER-selected equipment) subject to such Safety regulations and structural criteria shall be fabricated, furnished and installed in compliance with Seismic Zone 4 structural criteria. CONTRACTOR shall include provisions of this Article in his agreements with Subcontractors, Suppliers and manufacturers of equipment and/or products.
In selecting and/or accepting equipment and/or products for installation in the WORK, OWNER, DESIGN CONSULTANT and CONSTRUCTION MANAGER assume no responsibility for the injury, property damage or any other damages or claims resulting from failure of the equipment, products, components and/or package systems to comply with applicable Safety Codes or requirements, or the Safety requirements of a recognized agency, or failure due to manufacturer’s faulty design concepts, or Defective Work and materials. CONTRACTOR shall defend, indemnify and hold OWNER, DESIGN CONSULTANT and CONSTRUCTION MANAGER harmless against any and all liability, claims, suits, damages, costs or expenses caused or claimed to be caused in whole or in part by the negligence or willful misconduct of the construction CONTRACTOR connected with the WORK. However, this indemnity will not extend to any loss, damage or expense caused by the established sole gross negligence or willful misconduct of OWNER or OWNER’s Agents, servants or independent contractors.
6.3 SUPERVISION, SUPERINTENDENCE AND QUALITY - CONTRACTOR shall supervise, inspect and direct the WORK competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the WORK in accordance with the Contract Documents. CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences and procedures of construction and Safety precautions and programs incidental thereto. CONTRACTOR shall be responsible to see that the completed WORK complies accurately with the Contract Documents. CONTRACTOR is solely responsible for the quality of the WORK.
6.4 SUPERINTENDENT
Exhibit A
06/2026/A26-0119/BidDocs
GC 19
6.4.1 Written Designation of Superintendent - CONTRACTOR shall designate in writing and keep on the work site at all times during its progress a technically qualified, English-speaking superintendent and an alternate who are employees of CONTRACTOR and who shall not be replaced without written notice to OWNER and CONSTRUCTION MANAGER. The superintendent will be CONTRACTOR’s representative at the site and shall have authority to act on behalf of CONTRACTOR. All communications given to the superintendent shall be as binding as if given to CONTRACTOR. CONTRACTOR shall issue all its communications to OWNER and DESIGN CONSULTANT through CONSTRUCTION MANAGER.
6.4.2 Superintendent’s Presence at Site - CONTRACTOR’s superintendent or alternate shall be present at the site of the WORK at all times while work is in progress, and shall be available by phone for emergencies twenty-four (24) hours per Day, seven (7) Days per week. Failure to observe this requirement shall be considered suspension of the WORK by CONTRACTOR until such time as such the superintendent is again present at the site.
6.4.3 Removal of Superintendent - Upon written notice, OWNER may require replacement and removal from the WORK of CONTRACTOR’s superintendent with cause, in which case CONTRACTOR shall submit a replacement superintendent subject to approval by OWNER, at no increase in Contract Price or Contract Time. Repeated Safety violation on the job site will be sufficient grounds for directing such replacement.
6.5 LABOR - CONTRACTOR shall provide competent, suitably-qualified personnel to survey and lay out the WORK and perform construction as required by the Contract Documents. Any person employed who is found to be incompetent, intemperate, troublesome, disorderly or otherwise objectionable, or who fails or refuses to perform work properly, acceptably and safely, shall be immediately removed from the WORK by CONTRACTOR and not be reemployed on the WORK. CONTRACTOR shall furnish, erect, maintain and remove the construction plant and any temporary works as may be required. CONTRACTOR shall at all times maintain good discipline and order at the site and will not permit the use or consumption of drugs (illegal substances) or alcoholic beverages at the site.
6.5.1 No Additional Compensation for Overtime - Except as otherwise provided in this Article, CONTRACTOR shall receive no additional compensation for overtime work, (i.e., work in excess of eight (8) hours in any one (1) calendar Day or forty (40) hours in any one (1) calendar week) even though such overtime work may be required under emergency conditions and may be ordered by CONSTRUCTION MANAGER in writing. Additional compensation will be paid CONTRACTOR for overtime work only in the event extra work is ordered by CONSTRUCTION MANAGER, and the Change Order specifically authorizes the use of overtime work and then only to such extent as overtime wages are regularly being paid by CONTRACTOR for overtime work of a similar nature in the same locality.
6.5.2 Approval Required to Work Outside Normal Work Hours - Except in connection with the Safety or protection of persons or the WORK or property at the site or adjacent thereto, and except as otherwise indicated in the Contract Documents, all work at the site shall be performed during normal working hours, and CONTRACTOR will not permit overtime work or the performance of work on Saturday, Sunday or any holiday observed by OWNER without
Exhibit A
06/2026/A26-0119/BidDocs
GC 20
OWNER’s written consent. CONTRACTOR shall apply for this consent through CONSTRUCTION MANAGER. CONSTRUCTION MANAGER has to approve CONTRACTOR working Holidays, weekends or overtime. CONTRACTOR will be responsible for reimbursing OWNER for all cost to provide inspection services required to monitor WORK outside of normal working hours. CONTRACTOR will be charged for this actually incurred direct hourly cost plus OWNER-approved overhead cost plus OWNER-approved profit, and a deductive Change Order will be issued to cover this expense.
6.5.3 SUBCONTRACT LIMITATIONS - CONTRACTOR shall perform not less than twenty (20) percent of the WORK with its own forces without subcontracting. This requirement refers to the WORK whose value will not be less than twenty (20) percent of the Contract Price.
6.6 PROGRESS SCHEDULE - CONTRACTOR shall adhere to the progress schedule established in accordance with the General Requirements as it may be adjusted from time to time as provided below:
6.6.1 Non Impacting Adjustments - CONTRACTOR shall submit to CONSTRUCTION MANAGER for acceptance proposed adjustments in the progress schedule that will not change the Contract Time (or Milestones). Such adjustments will conform generally to the progress schedule then in effect and additionally will comply with any provisions of the General Requirements applicable thereto.
6.6.2 Revisions To Milestones - Proposed revisions in the progress schedule that will change the Contract Times (or Milestones) shall be submitted in accordance with the requirements of Article
12. Such adjustments may only be made by a Change Order in accordance with Article 12 of the General Conditions.
6.7 SUBSTITUTES OR “OR-EQUAL” ITEMS - Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent or “or-equal” item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be submitted to CONSTRUCTION MANAGER for review under the circumstances described below.
6.7.1 “Or-Equal” Items: If in CONSTRUCTION MANAGER’s sole discretion an item of material or equipment proposed by CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in the WORK will be required, it may be considered by CONSTRUCTION MANAGER as an “or-equal” item, in which case review and approval of the proposed item may, in CONSTRUCTION MANAGER’s sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. A proposed item of material or equipment will be considered functionally equal to an item so named if:
a. in the exercise of reasonable judgment CONSTRUCTION MANAGER determines that:
Exhibit A
06/2026/A26-0119/BidDocs
GC 21
i. it is at least equal in materials of construction, quality, durability, appearance, strength and design characteristics;
ii. it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the WORK as a functioning whole; iii. it has a proven record of performance and availability of responsive service; and
b. CONTRACTOR certifies that, if approved and incorporated into the WORK:
i. there will be no increase in cost to OWNER or increase in Contract Time, and
ii. it will conform substantially to the detailed requirements of the item named in the Contract Documents.
6.7.2 Substitute Items
a. If in CONTRACT MANAGER’s sole discretion an item of material or equipment proposed by CONTRACTOR does not qualify as an “or-equal,” it will be considered a proposed substitute item.
b. CONTRACTOR shall submit sufficient information as provided below to allow CONTRACT MANAGER to determine that the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefore. Requests for review of proposed substitute items of material or equipment will not be accepted by CONTRACT MANAGER from anyone other than CONTRACTOR.
c. The procedure requirements for review by CONTRACT MANAGER will be as set forth in Paragraph 6.7.2.d, and as CONTRACT MANAGER may decide is appropriate under the circumstances.
d. CONTRACTOR shall make written application to CONTRACT MANAGER for review of a proposed substitute item of material or equipment that CONTRACTOR seeks to furnish or use. The application:
i. shall certify that the proposed substitute item will:
1. perform adequately the functions and achieve the results called for by the general design,
2. be similar in substance to that specified, and
3. be suited to the same use as that specified;
ii. will state:
1. the extent, if any, to which the use of the proposed substitute item will prejudice CONTRACTOR’s achievement of Substantial
Completion on time;
2. whether or not use of the proposed substitute item in the WORK will require a change in any of the Contract Documents (or in the provisions of any other direct contract with OWNER for other work on the Project) to adapt the design to the proposed substitute item; and
3. whether or not incorporation or use of the proposed substitute item in connection with the WORK is subject to payment of any license fee or royalty;
iii. will identify:
Exhibit A
06/2026/A26-0119/BidDocs
GC 22
1. all variations of the proposed substitute item from that specified, and
2. available engineering, sales, maintenance, repair and replacement services;
iv. and shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and claims of other contractors affected by any resulting change.
6.7.3 Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence or procedure of construction is expressly required by the Contract Documents, CONTRACTOR may furnish or utilize a substitute means, method, technique, sequence or procedure of construction approved by CONTRACT MANAGER. CONTRACTOR shall submit sufficient information to allow CONTRACT MANAGER, in CONTRACT MANAGER’s sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. The requirements for review by CONTRACT MANAGER will be similar to those provided in Paragraph 6.7.2.d.
6.7.4 Contract Manager’s Evaluation: CONTRACT MANAGER will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs
6.7.2.d and 6.7.3. CONTRACT MANAGER may require CONTRACTOR to furnish additional data about the proposed substitute item. CONTRACT MANAGER will be the sole judge of acceptability. No “or equal” or substitute will be ordered, installed or utilized until CONTRACT MANAGER’s review is complete, which will be evidenced by either a Change Order for a substitute or an approved Shop Drawing for an “or equal.” CONTRACT MANAGER will advise CONTRACTOR in writing of any negative determination.
6.7.5 Special Guarantee: OWNER may require CONTRACTOR to furnish at CONTRACTOR’s expense a special performance guarantee or other surety with respect to any substitute.
6.7.6 Contract Manager’s Cost Reimbursement: CONTRACT MANAGER will record CONTRACT MANAGER’s costs in evaluating a substitute proposed or submitted by CONTRACTOR pursuant to Paragraphs 6.7.2.d and 6.7.3. Whether or not CONTRACT MANAGER approves a substitute item so proposed or submitted by CONTRACTOR, CONTRACTOR shall reimburse OWNER for the charges of CONTRACT MANAGER for evaluating each such proposed substitute. CONTRACTOR shall also reimburse OWNER for the charges of CONTRACT MANAGER for making changes in the Contract Documents (or in the provisions of any other direct contract with OWNER) resulting from the acceptance of each proposed substitute.
6.7.7 CONTRACTOR’s Expense: CONTRACTOR shall provide all data in support of any proposed substitute or “or-equal” at CONTRACTOR’s expense
6.8 PROJECT SITE COORDINATION
Exhibit A
06/2026/A26-0119/BidDocs
GC 23
6.8.1 Work By Others - CONTRACTOR shall be responsible for ascertaining the nature and extent of any simultaneous, collateral and essential work by others as described in the General Requirements.
CONTRACTOR shall provide staging areas and include work windows for work by others into the overall construction schedule. No additional working days will be allowed for CONTRACTOR’s failure to coordinate work by others.
6.8.2 Coordination Of Work - OWNER, CONTRACTOR and each of such workers, contractors and others shall cooperate to minimize interference.
6.8.3 Cost Of Coordination - CONTRACTOR shall include in its Bid all costs involved as a result of coordinating its WORK with others. CONTRACTOR will not be entitled to additional compensation from OWNER for damages resulting from such simultaneous, collateral and essential work. CONTRACTOR’s sole and exclusive remedy as a third party beneficiary to other prime contracts for damages caused by another contractor will be a direct action against the separate contractor. If necessary to avoid or minimize such damage or delay, CONTRACTOR shall redeploy its work force to other parts of the WORK.
6.8.4 Obligation to Provide Access - CONTRACTOR shall afford each other contractor who is a party to such a direct contract and each utility owner (or OWNER, if OWNER is performing the additional work with OWNER’s employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such work, and shall properly connect and coordinate work performed by others with their WORK as described in these Contract Documents.
6.8.5 CONTRACTOR shall do all cutting, fitting and patching of the WORK that may be required to make its several parts come together properly and integrate with such other work.
6.8.6 CONTRACTOR shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of CONSTRUCTION MANAGER and the others whose work will be affected.
6.9 COORDINATION WITH SUBCONTRACTORS AND SUPPLIERS
6.9.1 CONTRACTOR shall be solely responsible for scheduling and coordinating the WORK of Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the WORK under a direct or indirect contract with CONTRACTOR. CONTRACTOR shall require all Subcontractors, Suppliers and such other persons and organizations performing or furnishing any of the WORK to communicate with CONSTRUCTION MANAGER through CONTRACTOR. All WPRL performed by a Subcontractor or Supplier will be pursuant to an appropriate agreement between CONTRACTOR and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents.
Exhibit A
06/2026/A26-0119/BidDocs
GC 24
6.9.2 Subcontractor has no contractual relationship with OWNER. Nothing contained in this Article shall create any contractual relationship between any Subcontractor and OWNER or CONSTRUCTION MANAGER, nor relieve CONTRACTOR of any liability or obligation under the Agreement. CONTRACTOR shall include these General Conditions and the Supplementary General Conditions as a part of all its subcontract agreements.
6.9.3 DIVISION OF WORK - The divisions and sections of the Specifications and the identifications of any Drawings shall not control CONTRACTOR in dividing the WORK among Subcontractors or Suppliers or delineating the WORK to be performed by any specific trade.
6.10 PATENT FEES AND ROYALTIES - CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use in the performance of the WORK or the incorporation in the WORK of any invention, design, process, product or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product or device is specified in the Contract Documents for use in the performance of the WORK and if to the actual knowledge of OWNER, or DESIGN CONSULTANT, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by OWNER in the Contract Documents.
6.11 PERMITS - Unless otherwise provided in the Supplementary General Conditions, CONTRACTOR shall obtain and pay for all construction permits and licenses from the agencies having jurisdiction, including the furnishing of insurance and Bonds if required by such agencies.
The enforcement of such requirements under this Agreement shall not be made the basis for claims for additional compensation. OWNER shall assist CONTRACTOR, only when necessary, in obtaining such permits and licenses. CONTRACTOR shall pay all governmental charges and inspection fees necessary for the prosecution of the WORK, which are applicable at the time of opening of Bids. CONTRACTOR shall pay all charges of utility owners for connections to the WORK.
6.12 LAWS AND REGULATIONS - CONTRACTOR shall observe and comply with all Federal, State and local laws, ordinances, Codes, orders and regulations which in any manner affect those engaged or employed on the WORK, the materials used in the WORK or the conduct of the WORK. If any discrepancy or inconsistency should be discovered in this Agreement in relation to any such law, ordinance, code, order or regulation, CONTRACTOR shall immediately report the same in writing to CONSTRUCTION MANAGER.
6.13 TAXES - CONTRACTOR shall pay all sales, consumer, use and other similar taxes required to be paid in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance of the WORK. OWNER is not exempt from sales tax.
6.14 Intentionally Omitted.
6.15 USE OF PREMISES
6.15.1 General - CONTRACTOR shall confine construction equipment, the storage of materials and equipment and the operations of workers to the Project site, the land and areas identified in
Exhibit A
06/2026/A26-0119/BidDocs
GC 25
and permitted by the Contract Documents and the other land and areas permitted by Laws and Regulations, rights-of-way, permits and easements as approved by CONSTRUCTION MANAGER. CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof or of any land or areas contiguous thereto, resulting from the performance of the WORK. Should any claim be made against OWNER or CONSTRUCTION MANAGER by any such owner or occupant because of the performance of the WORK, CONTRACTOR shall promptly attempt to settle with such other party by agreement or otherwise resolve the claim through litigation.
6.16 PROJECT SITE MAINTENANCE AND INTERFERENCE WITH ADJACENT
PROPERTY
6.16.1 Cost of General Requirements in Contract Price - CONTRACTOR is obligated to comply with the General Requirements. All costs associated with this compliance are to be included in the basic Contract Price.
6.16.2 Vehicle Load Limits - When materials are transported in prosecuting the WORK, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by law or regulation. When it is necessary to cross curbs, sidewalks or drainage facilities CONTRACTOR shall protect them from damage.
6.16.3 Work Outside The Agreement Limits - Despite the designation of Contract Documents or the indication of temporary fences or barricades, the provisions of the Contract Documents governing certain portions of the WORK may require that certain operations be carried out beyond such limits. In those cases, trenching, utility work, site development and landscaping shall be scheduled so as to occasion a minimum of inconvenience or disturbance to or interference with the normal operation of the owner, abutters and the public. CONTRACTOR shall obtain CONSTRUCTION MANAGER’s prior approval and all necessary approvals from other agencies, public entities or the government for such operations, and prosecute such operations expeditiously and restore the premises affected to their original condition immediately upon completion of such operations, unless otherwise specified in the Contract Documents. All existing walks, roadways, paved or landscaped areas on which temporary driveways or walks are rerouted shall be restored to their original condition, immediately upon completion of those phases of the WORK, unless otherwise specified in the Contract Documents. Pumping, draining and control of surface and ground water shall be carried out so as to avoid endangering the WORK or any adjacent facility or property, or interrupting, restricting or otherwise infringing or interfering with its use.
6.16.4 Responsibilities For Damage - All damage, injury or loss to any persons or property caused, directly or indirectly, in whole or in part, by CONTRACTOR, any Subcontractor, Supplier or any other person or organization directly or indirectly employed by any of them to perform or furnish any of the WORK or anyone for whose acts any of them may be liable, shall be remedied by CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of OWNER or CONSTRUCTION MANAGER or DESIGN CONSULTANT). CONTRACTOR’s duties and responsibilities for Safety and for protection of the WORK shall continue until such time as all the WORK is completed and CONSTRUCTION
Exhibit A
06/2026/A26-0119/BidDocs
GC 26
MANAGER has issued a notice to OWNER and CONTRACTOR in accordance with Article 14 that the WORK is complete.
6.17 CONTRACTOR’S DAILY REPORTS - CONTRACTOR shall complete a daily report indicating his total manpower for each construction trade, major equipment on site, each Subcontractor’s manpower, weather conditions and any other items required by CONSTRUCTION MANAGER. The daily report shall be completed on forms provided by CONSTRUCTION MANAGER and shall be submitted to CONSTRUCTION MANAGER by 9:00 a.m. the following work Day. The report should comment on the daily progress and status of the work within each major component of the WORK. These components will be determined by CONSTRUCTION MANAGER. Submitting acceptable daily reports as required is a precondition to approval of the monthly progress payment. However, these reports are not to be used to meet the notice requirements contained elsewhere in the General Conditions.
6.18 SAFETY
6.18.1 Safety Plan - CONTRACTOR will be required to comply with General Requirements provided by CONSTRUCTION MANAGER. CONTRACTOR shall submit a written Safety plan to CONSTRUCTION MANAGER prior to commencement of any work on site. CONTRACTOR shall be responsible for initiating, maintaining and supervising all Safety precautions and programs in connection with the WORK.
6.18.2 Safety Laws and Regulations - CONTRACTOR shall comply with all applicable Laws and Regulations of any public body having jurisdiction for the Safety of persons or property or to protect them from damage, injury or loss and shall erect and maintain all necessary safeguards for such Safety and protection. CONTRACTOR shall notify owners of adjacent property and of Underground Utilities when prosecution of the WORK may affect them and shall cooperate with them in the protection, removal, relocation and replacement of their property.
6.18.3 Safety Representative - CONTRACTOR shall designate a qualified and experienced Safety representative at the site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of Safety precautions and program. The Safety representative must meet the requirements stated in Supplemental General Conditions 6.18 “Safety.”
6.18.4 Safety Orders - CONTRACTOR shall have at the WORK site as applicable, copies or suitable extracts of: Construction Safety Orders, Tunnel Safety Orders and General Industry Safety Orders issued by the State Division of Industrial Safety. CONTRACTOR shall comply with provisions of these and all other applicable laws, ordinances and regulations.
6.18.5 Trench Shoring Plan - Before excavating any trench five (5) feet or more in depth, CONTRACTOR shall submit to OWNER a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for the workers’ protection from the hazard of caving ground during the excavation of such trench. If the plan varies from the shoring system standards, the plan shall be prepared by a California registered civil construction manager. No excavation shall start until CONSTRUCTION MANAGER has accepted the plan and CONTRACTOR has
Exhibit A
06/2026/A26-0119/BidDocs
GC 27
obtained a permit from the State Division of Industrial Safety. A copy of the permit shall be submitted to CONSTRUCTION MANAGER and posted at the site.
6.18.6 Use of Explosives - Explosives may be used only when authorized in writing by CONSTRUCTION MANAGER, or as otherwise stated in the Specifications. Explosives shall be handled, used and stored in accordance with all applicable regulations. CONSTRUCTION MANAGER’s approval of the use of explosives shall not relieve CONTRACTOR from liability for claims caused by blasting operations.
6.18.7 Hazardous Communication Program
6.18.7.1 Notification to employees is required when materials that contain hazardous substances or mixtures are required on the WORK. A material safety data sheet as described in section 5194 of the California Code of Regulations shall be requested by CONTRACTOR from the manufacturer of any hazardous product used.
6.18.7.2 Material usage shall be accomplished with strict adherence to California Division of Industrial Safety requirements and all manufacturer’s warnings and application instructions listed on the material safety data sheet and on the product container label.
6.18.7.3 CONTRACTOR shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the site in accordance with laws or regulations, with copies to CONSTRUCTION MANAGER.
6.18.7.4 Unsafe Products - CONTRACTOR shall notify CONSTRUCTION MANAGER if it considers a specified or required product or its intended usage to be unsafe. This notification must be given to CONSTRUCTION MANAGER prior to the product being ordered, or if provided by some other party, prior to the product being used or incorporated in the WORK.
6.18.8 Safety Measures In Bid - Payment for performing all work necessary to provide Safety measures shall be included in the prices bid for other items of work except where separate bid items for excavation Safety are provided.
6.18.9 Safety Reporting
6.18.9.1 Weekly First Aid Logs - This log should be delivered to CONSTRUCTION MANAGER three (3) Days after the weekly reporting period.
6.18.9.2 Accident and Injury Reports - This report should be delivered within twenty-four (24) hours of the injury or accident.
6.18.10 CONSTRUCTION MANAGER Safety Deficiency Report - CONTRACTOR is required to respond to this report within two (2) working Days explaining his corrective action and proposed schedule for this action.
Exhibit A
06/2026/A26-0119/BidDocs
GC 28
6.19 EMERGENCY - In emergencies affecting the Safety or protection of persons or the WORK or property at or adjacent to the site, CONTRACTOR, without special instruction or authorization from CONSTRUCTION MANAGER, is obligated to act to prevent threatened damage, injury or loss. CONTRACTOR shall give CONSTRUCTION MANAGER prompt written notice if CONTRACTOR believes that any significant changes in the WORK have resulted because of the action taken in response to an emergency. If it is determined by OWNER that a change is required, a change shall be authorized by Change Order.
6.20 SHOP DRAWINGS AND SAMPLES
6.20.1 After checking and verifying all field measurements and after complying with applicable procedures specified in the General Requirements, CONTRACTOR shall submit to CONSTRUCTION MANAGER for DESIGN CONSULTANT’s review all Shop Drawings in accordance with the accepted schedule of Shop Drawings Submittals specified in Bidding Documents section Bid Forms.
6.20.2 CONTRACTOR shall also submit to CONSTRUCTION MANAGER for review all Samples in accordance with the accepted schedule of sample Submittals specified in the General Requirements.
6.20.3 Before submittal of each Shop Drawing or Sample, CONTRACTOR shall have determined and verified all quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers and similar data with respect thereto and reviewed or coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the WORK and the Contract Documents.
6.20.4 CONTRACTOR shall, at his own expense, furnish for review, and obtain approval by the CONSTRUCTION MANAGER, three (3) copies each of detailed submittals for materials, installation drawings, and construction procedures for the following:
Any material which differ from that specified with a brand name on the Plans and in this Special Provisions
Public notification flyers
Traffic control plans
Portland cement concrete design mix
Conventional Asphalt design mix
RHMA/ARHM design mix
ARAM design mix
Class II Base (if used)
Tack Coat Oil
Manhole Lid and/or material pertaining to adjustment
Valve Can Lid and/or material pertaining to adjustment Monument Well Can Lid and/or material pertaining to adjustment Monument Preservation Certificate (Prior to any construction/demolition activities) Striping Plans / Contractor Notes
Exhibit A
06/2026/A26-0119/BidDocs
GC 29
Striping Paint, Thermoplastic, reflective beads, pavement markers and other material pertaining to installation of new traffic striping.
In addition, OWNER’s representative may, at his discretion, require shop drawings on other equipment or construction activities not included in the above list. OWNER’s representative shall have ten (10) working days to review and return the shop drawings to CONTRACTOR after receipt of said drawings.
6.21 SUBMITTAL ACCEPTANCE
6.21.1 DESIGN CONSULTANT Review Scope and Limitation - DESIGN CONSULTANT will review and approve Shop Drawings and Samples. DESIGN CONSULTANT’s review and approval will be only to determine if the items covered by the Submittals will, after installation or incorporation in the WORK, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. DESIGN CONSULTANT’s review and approval will not extend to means, methods, techniques, sequences or procedures of construction except where a particular means, method, technique, sequence or procedure of construction is specifically and expressly called for by the Contract Documents or to Safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. CONTRACTOR shall make corrections required by DESIGN CONSULTANT, and shall return the required number of corrected copies of Shop Drawings and submit as required new Samples for review and approval. CONTRACTOR shall direct specific attention in writing to revisions other than the corrections called for by DESIGN CONSULTANT on previous Submittals.
6.21.2 CONTRACTOR’s Responsibility Not Relieved By Approval - CONSTRUCTION MANAGER’s and DESIGN CONSULTANT’s review and approval of Shop Drawings or Samples shall not relieve CONTRACTOR from responsibility for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called DESIGN CONSULTANT’s attention to each such variation at the time of submission and DESIGN CONSULTANT has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample approval; nor will any approval by DESIGN CONSULTANT relieve CONTRACTOR from responsibility for complying with the requirements of Article 6.
6.22 COMPLIANCE WITH CONSTRUCTION MANAGER ADMINISTRATIVE PROCEDURES - CONTRACTOR is required to comply with all CONSTRUCTION MANAGER administrative procedures including but not limited to daily reports, Requests for Proposal, Safety reporting, notice requirements, payment procedures, submittal processing, attendance at weekly and special meetings and others designated by CONSTRUCTION MANAGER.
6.23 ASSIGNMENT OF CONTRACT - CONTRACTOR shall not assign, sublet, sell, transfer or otherwise dispose of the Contract Documents or any portion thereof, or its right, title or interest therein, or obligations thereunder, without the written consent of OWNER except as imposed by
Exhibit A
06/2026/A26-0119/BidDocs
GC 30
law. If CONTRACTOR violates this provision, the Agreement may be terminated at the option of OWNER. In such event, OWNER shall be relieved of all liability and obligations to CONTRACTOR and to its assignee or transferee growing out of such termination.
6.24 CONTINUING THE WORK DURING DISPUTES
6.24.1 CONTRACTOR shall carry on the WORK and adhere to the progress schedule during all disputes or disagreements with OWNER over any WORK scope, price or time dispute. No work shall be delayed or postponed pending resolution of any disputes or disagreements, except as CONTRACTOR and OWNER may otherwise agree in writing.
6.24.2 If CONTRACTOR and OWNER are unable to reach agreement on Disputed Work, OWNER may direct CONTRACTOR to proceed with the WORK. Payment shall be as later determined by Article 16.
6.25 GENERAL WARRANTY AND GUARANTEE CONTRACTOR is responsible for providing warranty and guarantee in accordance with Article 13.
6.26 INDEMNIFICATION – In addition and complementary to, the Construction Services Agreement and to the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify, defend and hold harmless OWNER, CONSTRUCTION MANAGER, DESIGN CONSULTANT, their consultants, Sub-Consultants and the officers, directors, employees and agents of each and any of them against and from all claims and liability arising under, by reason of or incidentally to the Agreement or any performance of the WORK, but not from the sole gross negligence or willful misconduct of OWNER, CONSTRUCTION MANAGER and/or DESIGN CONSULTANT. Such indemnification by CONTRACTOR shall include but not be limited to the following:
6.26.1 CONTRACTOR Negligence - Liability or claims resulting directly or indirectly from the negligence or carelessness of CONTRACTOR, its employees or agents in the performance of the WORK, or in guarding or maintaining the same, or from any improper materials, implements or appliances used in its construction, or by or on account of any act or omission of CONTRACTOR, its employees or agents;
6.26.2 Claims By CONTRACTOR Employees - Liability or claims arising directly or indirectly from bodily injury, occupational sickness or disease or death of CONTRACTOR’s or Subcontractor’s own employees engaged in the WORK resulting in actions brought by or on behalf of such employees against OWNER, CONSTRUCTION MANAGER and/or DESIGN CONSULTANT;
6.26.3 Violation Of Law - Liability or claims arising directly or indirectly from or based on the violation of any law, ordinance, regulation, order or decree, whether by CONTRACTOR, its employees or agents;
6.26.4 Patent, Copyright Or Secret Process - Liability or claims arising directly or indirectly from the use or manufacture by CONTRACTOR, its employees or agents in the performance of
Exhibit A
06/2026/A26-0119/BidDocs
GC 31
this Agreement of any copyrighted or un-copyrighted composition, secret process, patented or unpatented invention, article or appliance, unless otherwise specifically stipulated in this Contract.
6.26.5 Breach Of Warranty - Liability or claims arising directly or indirectly from the breach of any warranties, whether express or implied, made to OWNER or any other parties by CONTRACTOR, its employees or agents;
6.26.6 Willful Misconduct - Liabilities or claims arising directly or indirectly from the willful misconduct of CONTRACTOR, its employees or agents; and,
6.26.7 CONTRACTOR Reimbursement Of Cost - Liabilities or claims arising directly or indirectly from any breach of the obligations assumed herein by CONTRACTOR, CONTRACTOR shall reimburse OWNER, CONSTRUCTION MANAGER and DESIGN CONSULTANT for all costs and expenses, (including but not limited to fees and charges of engineers, architects and other professionals and court costs including all costs of appeals) incurred by said OWNER, CONSTRUCTION MANAGER and DESIGN CONSULTANT in enforcing the provisions of this Article.
6.26.8 Use Of Premises - Liabilities of claims arising directly or indirectly from the use of the premises by CONTRACTOR, its employees or agents.
6.26.9 No Indemnification Limitation - The indemnification obligation in Article 6 shall not be limited in any way by any limitation of the amount or type of damages, compensation or benefits payable by or for CONTRACTOR or any such Subcontractor or other person or organization under Workers’ Compensation acts, disability benefit acts or other employee benefit acts. However, the indemnification obligations of CONTRACTOR shall not extend to the liability of DESIGN CONSULTANT when caused by the professional negligence, errors or omissions.
6.26.10 OSHA/CalOSHA Citations - CONTRACTOR shall indemnify CONSTRUCTION MANAGER against fines, reasonable attorneys’ fees and defense costs resulting from citations issued to CONSTRUCTION MANAGER by either the Federal, State or local Safety enforcement agencies due to CONTRACTOR’s failure to abide by applicable Safety and health standards.
6.26.11 Survival of Obligations - All representations, indemnifications, warranties and guarantees made in, required by or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive Final Payment, completion and acceptance of the WORK and termination or completion of the Agreement.
ARTICLE 7 -- WORK BY OTHERS AT THE SITE
7.1 OWNER’S RIGHT TO WORK AT SITE - OWNER may perform other work related to the Project at the site by OWNER’s own forces, have other work performed by utility owners, or let other direct contracts which may contain General Conditions similar to these. If the fact that such other work is to be performed was not noted in the Contract Documents, written notice thereof will be given to CONTRACTOR prior to starting any such other work.
Exhibit A
06/2026/A26-0119/BidDocs
GC 32
7.2 CONTRACTOR REPORT ON DELAYS CAUSED BY OTHERS - If the proper execution or results of any part of CONTRACTOR’s work depends upon the work of any such other contractor or utility owner (or OWNER), CONTRACTOR shall promptly inspect and report to CONSTRUCTION MANAGER in writing any apparent delays, defects or deficiencies in such other work that render it unavailable or unsuitable for such proper execution and results.
CONTRACTOR’s failure to report such delays, defects or deficiencies in writing before commencement of the affected WORK will constitute an acceptance of the other work as fit and proper for integration with CONTRACTOR’s work except for latent defects and deficiencies in the other work.
7.3 DAMAGE TO OTHERS CAUSED BY CONTRACTOR - If CONTRACTOR causes damage to the work, property or person of any other contractor employed by OWNER, or if any claim arising out of CONTRACTOR’s performance of the WORK by any other contractor is made against CONTRACTOR, by OWNER, CONSTRUCTION MANAGER, DESIGN CONSULTANT, any other contractor or any other person, CONTRACTOR shall be responsible to settle and shall promptly attempt to settle and resolve the dispute.
7.4 COORDINATION
7.4.1 Coordination Responsibilities - CONTRACTOR’s coordination responsibilities are in accordance with those found in Article 6 and in the described Supplementary General Conditions if applicable.
7.4.2 Coordination Delays - Should CONTRACTOR be delayed by OWNER, and such delay could not reasonably have been foreseen and prevented by CONTRACTOR, CONSTRUCTION MANAGER will determine the extent of the delay, the effect of the delay on the work as a whole, and any commensurate extension of time. CONSTRUCTION MANAGER shall arrange meetings with other contractors performing work on behalf of OWNER to plan coordination of construction activities. Any difference or conflict arising between CONTRACTOR and any other contractor employed by OWNER shall be submitted to CONSTRUCTION MANAGER for a decision in the matter. CONTRACTOR shall comply with reasonable direction from CONSTRUCTION MANAGER whose decision on coordination matters will be final.
7.5 Remedy For Delays By Others - By entering into this Agreement, CONTRACTOR acknowledges that there may be other contractors on the site whose WORK will be coordinated with that of his own. CONTRACTOR expressly warrants and agrees that he will cooperate with other contractors and will do nothing to delay, hinder or interfere with the WORK of other separate contractors, OWNER, CONSTRUCTION MANAGER or DESIGN CONSULTANT.
CONTRACTOR also expressly agrees that, in the event his work is hindered, delayed, interfered with or otherwise affected by a separate contractor, his sole remedy will be a direct action against the separate contractor. Except as otherwise provided by law, CONTRACTOR will have no remedy, and hereby expressly waives any remedy, against OWNER and/or CONSTRUCTION MANAGER or DESIGN CONSULTANT on account of delay, hindrance, interference or other event caused by a separate contractor.
Exhibit A
06/2026/A26-0119/BidDocs
GC 33
7.6 Out Of Sequence Or Accelerated Work - When WORK is performed out of sequence and ahead of Interfacing Work, CONTRACTOR shall be responsible for taking reasonable steps to minimize damage or loss to the WORK which may be caused by others during the performance of their work, including but not limited to furnishing prompt written notice to CONSTRUCTION MANAGER and to the other contractors that WORK has been performed out of sequence and ahead of Interfacing Work.
7.7 NATIONAL LABOR RELATIONS BOARD REQUIREMENTS - CONTRACTOR’s Price shall include all costs associated with complying with any applicable National Labor Relations Board requirements for accessing the Project site.
ARTICLE 8 -- OWNER’S RESPONSIBILITIES
8.1 GENERAL - OWNER has the final authority in all matters affecting the WORK.
8.2 COMMUNICATIONS - In general, OWNER and DESIGN CONSULTANT shall issue all written communications to CONTRACTOR through CONSTRUCTION MANAGER.
8.3 PAYMENTS - OWNER shall make payments to CONTRACTOR as provided in Article 14.
8.4 LANDS, EASEMENTS AND SURVEYS - OWNER’s duties in respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Article 4. OWNER shall identify and make available to CONTRACTOR copies of reports of explorations and tests of subsurface conditions at the site and in existing structures which have been utilized in preparing the Contract Documents as set forth in Article 4.
8.5 CHANGE ORDERS - OWNER shall execute Change Orders as indicated in Article 10.
8.6 INSPECTIONS AND TESTS - OWNER’s responsibility with respect to inspections, tests and approvals is set forth in Article 13.
8.7 SUSPENSION OF WORK - In connection with OWNER’s right to stop work or suspend work, see Articles 13 and 15.
8.8 TERMINATION OF AGREEMENT - Article 15 deals with OWNER’s right to terminate services of CONTRACTOR.
8.9 OWNER’S RESPONSIBILITY FOR UNDISCLOSED HAZARDOUS MATERIALS - OWNER’S responsibility with respect to undisclosed Asbestos, PCBs, Petroleum, Hazardous Waste or Radioactive Materials uncovered or revealed at the site is set forth in Article 4.
8.10 NO OWNER SUPERVISION INTENDED - Neither OWNER nor CONSTRUCTION MANAGER shall supervise, direct or have control or authority over, nor be responsible for, CONTRACTOR’s means, methods, techniques, sequences or procedures of construction or the Safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the furnishing or performance of the WORK. OWNER
Exhibit A
06/2026/A26-0119/BidDocs
GC 34
and CONSTRUCTION MANAGER will not be responsible for CONTRACTOR’s failure to perform or furnish the WORK in accordance with the Contract Documents.
ARTICLE 9 -- CONSTRUCTION MANAGER’S STATUS DURING CONSTRUCTION
9.1 GENERAL
9.1.1 OWNER’S REPRESENTATIVE - CONSTRUCTION MANAGER will be OWNER’s representative during the construction period. The duties and responsibilities and the authority of CONSTRUCTION MANAGER as CONSTRUCTION MANAGER during construction are set forth in the Contract Documents.
9.1.2 Contract Documents Terms - Whenever in the Contract Documents the terms “as ordered,” “as directed,” “as required,” “as allowed,” “as reviewed,” “as approved,” or terms of like effect or import are used, or the adjectives “reasonable,” “suitable,” “acceptable,” “proper,” or “satisfactory” or adjectives of like effect or import are used to describe a requirement, direction, review or judgment of CONSTRUCTION MANAGER as to the WORK, it is intended that such requirement, direction, review or judgment will be solely to evaluate the WORK for compliance with the requirements of the Contract Documents, and conformance with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents, unless there is a specific statement indicating otherwise. The use of any such term or adjective shall not be effective to assign to CONSTRUCTION MANAGER any duty or authority to supervise or direct the performance of the WORK or any duty or authority to undertake responsibility contrary to the Article 9.
9.2 PRESENCE ON SITE - CONSTRUCTION MANAGER will be on site during construction to observe the progress, quantity and quality of the WORK and to determine, in general, if the WORK is proceeding in accordance with the Contract Documents. CONSTRUCTION MANAGER will not supervise, direct or have control over CONTRACTOR’s work.
9.3 CONTRACT DOCUMENT CLARIFICATIONS AND INTERPRETATIONS - CONSTRUCTION MANAGER will issue with reasonable promptness such written clarifications or interpretations of the requirements of the Contract Documents (in the form of Drawings or otherwise) as CONSTRUCTION MANAGER may determine necessary, which shall be consistent with or reasonably inferable from the overall intent of the Contract Documents. Such written clarifications and interpretations will be binding on OWNER and CONTRACTOR. If CONTRACTOR believes that a written clarification or interpretation justifies an adjustment in the Contract Price or the Contract Time and the parties are unable to agree to the amount or extent CONTRACTOR may request an adjustment in the Contract Price or an extension of the Contract Time therefore as provided in Articles 11 or 12.
9.4 AUTHORIZED VARIATIONS IN WORK - CONSTRUCTION MANAGER may authorize minor variations in the WORK, (not resulting in changes to the Contract Price or Contract Time), which are consistent with the intent of the Contract Documents. These may be accomplished by a Construction Manager Order. If CONTRACTOR believes that a Construction Manager Order justifies an increase in the Contract Price or an extension of the Contract Time,
Exhibit A
06/2026/A26-0119/BidDocs
GC 35
CONTRACTOR may request an adjustment in the Contract Price or an extension of the Contract Time therefore as provided in Articles 11 or 12. If CONTRACTOR proceeds with the directed work without making such a request or providing notice he will be presumed to be in agreement with CONSTRUCTION MANAGER’s determination that no change in price or time are involved, and will be considered to have waived his right to request an adjustment in Contract Time or Price.
9.5 ACCEPTANCE OF WORK - OWNER has the final authority in all matters affecting the WORK. Within the scope of the Agreement, CONSTRUCTION MANAGER has the authority to enforce compliance with the Plans and Specifications. CONTRACTOR shall promptly comply with instructions from CONSTRUCTION MANAGER or any authorized representative on all matters relating to quantities, the acceptability of material, equipment or work, the execution, progress or sequence of work and the interpretation of Specifications or Drawings. The decision of CONSTRUCTION MANAGER shall be precedent to any payment under the Agreement, unless otherwise ordered by OWNER. CONSTRUCTION MANAGER will recommend final acceptance to OWNER.
9.6 REJECTING DEFECTIVE WORK - CONSTRUCTION MANAGER will have authority to reject work which CONSTRUCTION MANAGER determines to be defective, or not in compliance with the Contract Documents or that DESIGN CONSULTANT or CONSTRUCTION MANAGER believes will not produce a completed Project or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CONSTRUCTION MANAGER will also have authority to require special inspection or testing of the WORK as provided in Article 13, whether or not the WORK is fabricated, installed or completed.
9.7 CONTRACTOR SUBMITTALS - CONTRACTOR shall provide submittals in accordance with the SPECIAL PROVISIONS.
9.8 CHANGE ORDER - In connection with CONSTRUCTION MANAGER’s responsibilities as to Change Orders, see Articles 10, 11, and 12.
9.9 PAYMENTS In connection with CONSTRUCTION MANAGER’s responsibility as to Applications for Payment, see Article 14.
9.10 FINAL APPLICATION FOR PAYMENT - CONSTRUCTION MANAGER’s review of the Final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, Bonds and certificates of inspection, tests and approvals and other documentation required to be delivered by Article 14 will only be to determine generally that their content complies with the requirements of, and in the case of certificates of inspections, tests and approvals that the results certified indicate compliance with the Contract Documents.
Exhibit A
06/2026/A26-0119/BidDocs
GC 36
9.11 DECISIONS ON DISPUTES
9.11.1 Interpreter Of Contract Documents - CONSTRUCTION MANAGER will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the WORK thereunder. Claims, disputes and other matters relating to the acceptability of the WORK, the interpretation of the requirements of the Contract Documents pertaining to the performance of the WORK and those claims with respect to changes in the Contract Price or Contract Time will be referred initially to CONSTRUCTION MANAGER. The process to be followed is described in Article 16.
9.12 CONSTRUCTION MANAGER LIABILITY FOR INTERPRETATION - When functioning as interpreter under Article 9, CONSTRUCTION MANAGER will not show partiality to OWNER, DESIGN CONSULTANT or CONTRACTOR and will not be liable in connection with any interpretation or decision rendered in good faith in such capacity. The rendering of a decision by CONSTRUCTION MANAGER pursuant to Article 9 will be a condition precedent to any exercise by CONTRACTOR of such rights or remedies as he may otherwise have under the Contract Documents or by laws or regulations in respect of any such Claim, dispute or other matter pursuant to Article 16.
9.13 LIMITATION ON CONSTRUCTION MANAGER’S RESPONSIBILITIES
9.13.1 No Duty Arising Out Of Act Or Decision - Neither CONSTRUCTION MANAGER’s authority to act under this Article 9 or other provisions of the Contract Documents, nor any decision made by CONSTRUCTION MANAGER in good faith either to exercise or not exercise such authority shall give rise to any duty or responsibility of CONSTRUCTION MANAGER to CONTRACTOR, any Subcontractor, any Supplier, any surety for any of them or any other person or organization performing any of the WORK.
9.13.2 No Supervision Role - CONSTRUCTION MANAGER will not supervise, direct, control or have authority over or be responsible for CONTRACTOR’s means, methods, techniques, sequences or procedures of construction, or the Safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations, applicable to the performance of the WORK. CONSTRUCTION MANAGER will not be responsible for CONTRACTOR’s failure to perform the WORK in accordance with the Contract Documents.
9.13.3 CONTRACTOR Acts Or Omissions - CONSTRUCTION MANAGER will not be responsible for the acts or omissions of CONTRACTOR nor of any Subcontractor, Supplier or any other person or organization performing any of the WORK.
ARTICLE 10 -- CHANGES IN THE WORK
10.1 CHANGES REQUESTED BY CONTRACTOR
10.1.1 CONSTRUCTION MANAGER Approval - Changes in the Plans and Specifications, requested in writing by CONTRACTOR, which do not materially affect the WORK and which are not detrimental to the WORK or to the interests of OWNER, may be granted to facilitate the
Exhibit A
06/2026/A26-0119/BidDocs
GC 37
WORK, when approved in writing by CONSTRUCTION MANAGER. If the method will result in a cost saving, an appropriate deductive change will be required.
10.1.2 Specified Methods - Changes in specified methods of construction may be made at CONTRACTOR’s request when approved in writing by CONSTRUCTION MANAGER. If the method will result in a cost saving, an appropriate deductive change will be required.
10.1.3 No Right To Change - Nothing herein shall be construed as granting a right to CONTRACTOR to demand acceptance of such changes.
10.1.4 Request for Change Made in Good Faith - The request For change shall be made in good faith, and the amount requested accurately reflects the adjustments in Contract Price or Contract Time for which CONTRACTOR believes OWNER is liable, and covers all direct, supplemental, indirect, consequential, serial and cumulative costs and delays to which CONTRACTOR is entitled as a result of the change.
10.2 OWNER’S RIGHT TO MODIFY WORK
10.2.1 Requirement To Implement Directed Change - Without invalidating the Agreement and without notice to any surety, OWNER may at any time or from time to time, order additions, deletions or revisions in the WORK; these will be authorized by a written Change Order prepared by CONSTRUCTION MANAGER and issued by OWNER. Upon receipt of any such document, CONTRACTOR shall promptly proceed with the work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided).
10.2.2 Request For Proposal - When OWNER desires a change in the WORK, CONSTRUCTION MANAGER will issue a Request for Proposal to CONTRACTOR.
CONTRACTOR will be required to respond within the time indicated by CONSTRUCTION MANAGER or fifteen (15) Days, whichever is less. If CONTRACTOR fails to meet the submittal time required by this provision, CONTRACTOR will be solely liable for any delays or impacts caused by the delayed submittal of the proposal.
10.3 REQUIREMENT TO PROCEED WITH WORK - If OWNER and CONTRACTOR agree on the value of any work, and the amount of Contract Time that should be allowed as a result of CONTRACTOR’s response to a Request for Proposal, CONTRACTOR shall proceed as directed by OWNER so as to minimize the impact on and delays to the work pending the issuance of a Change Order. If however, OWNER and CONTRACTOR are unable to agree as to the extent of an increase or decrease in the Contract Price or an extension or shortening of the Contract Time that should be allowed as a result of CONTRACTOR’s response to a Request for Proposal, OWNER can direct CONTRACTOR to proceed on the basis of a price for the WORK as estimated by CONSTRUCTION MANAGER or time and materials so as to minimize the impact on and delays to the work, in accordance with Article 11.
10.4 WORK NOT IN CONTRACT - CONTRACTOR shall not be entitled to an increase in the Contract Price nor an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, supplemented by Change Order