Cities Index.
Agenda packet

El Centro City Council
September 1, 2026

Document
Agenda packet
Meeting
September 1, 2026
Body
El Centro City Council
Pages
758
Original file
120.7 MB
Text extracted from the city's file for reading and search. Open the original on elcentroca.api.civicclerk.com. That file is the official record.

City Name 60 Day Notice
Drop Down (yes/no)
Notice of Public
Hearing
Drop Down (yes/no)
El Centro Yes Yes
Imperial Irrigation
District
Yes Yes
County Name
Drop Down List
60 Day Notice
Drop Down (yes/no)
Notice of Public
Hearing
Drop Down (yes/no)
Imperial County Yes Yes
Submittal Table 10-1 Retail: Notification to Cities and Counties Water Code Section 10621(b) and 10642
Add additional rows as needed
Add additional rows as needed
NOTES:

Page 432 of 758 ends

APPENDIX C
City of El Centro
Water Conservation Ordinance No. 17-01

Page 433 of 758 ends

ORDINANCE 17- 01

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF EL CENTRO AMENDING CHAPTER 28 ARTICLE III OF THE CITY CODE REGARDING WATER CONSERVATION REGULATIONS AND RESTRICTIONS.

THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA DOES HEREBY ORDAIN AS FOLLOWS:

SECTION 1. Chapter 28, Article III, Sections 28- 50 through Section 28- 55 ofthe City ofEl Centro City Code are hereby repealed in their entirety and readopted to read as follows:

Sec. 28- 50. - Generally.

It is hereby resolved by the City Council that in order to conserve the City's water supply for the greatest public benefit and to reduce the quantity of water used by the City's customers, wasteful use of water should be eliminated. It shall be unlawful for any person, firm, partnership, association, corporation, political entity ( including the City) or any other water department customer to use water in a manner inconsistent with this regulation.

No customer shall waste water. As used herein, the term " waste" means:
1) Use of potable water to irrigate turf, ground -cover, shrubbery, crops, vegetation, and trees in such a manner as to result in runoff for more than two (2) minutes; 2) Use of potable water in outdoor landscapes in a manner that causes runoff to nonirrigated areas, public walkways, roadways, parking lots, structures or an adjacent property;
3) Allowing potable water to escape from breaks within a customer's plumbing system for more than twenty-four (24) hours after the customer is notified or discovers the break; 4) The use of running water to wash vehicles shall be prohibited, except to wash such vehicles at commercial or fleet vehicle washing facilities using water recycling equipment. The use of buckets and stop nozzles on hoses, for rinsing only, shall be permitted; and
5) The use of potable water in a fountain or other decorative water feature, except where the water is part of a recirculating system.

Sec. 28- 51. - Water conservation plan implementation.

The water department shall monitor and evaluate the projected supply and demand for water by its customers and any state proclamations regarding drought conditions. In the event of a water shortage and/or statewide drought, the water department shall recommend that the council make a determination, by resolution, that a water shortage exists and that the appropriate water conservation plan shall take effect, as provided in this article. The City Council may discontinue any stage or may implement another stage as necessary. Upon a finding by the City Council that a water shortage no longer exists, any water shortage stage then in effect shall terminate.

Sec. 28- 52. - Water conservation plans.
a) STAGE 1 WATER CONSERVATION PLAN.

Under a stage 1 water conservation plan, in addition to those restrictions set forth in section 28- 50 above, the following prohibitions and restrictions on a customer's use of potable water shall apply:
1) Potable water may not be applied to outdoor landscapes in a manner that causes runoff such that water flows onto adjacent property, non -irrigated areas, private and public walkways, roadways, parking lots or structures.
11/ 2016cfo1A16-0251Mater Conservation Ordinance 1

Page 434 of 758 ends

2) A hose that dispenses potable water may not be used to wash a motor vehicle, except where the hose is fitted with a shut-off nozzle or device that causes it to cease dispensing water immediately when not in use
3) Potable water may not be applied to hardscapes, driveways, parking lots and walkways except, to protect public health and safety.
4) Potable water may not be used in a fountain or other decorative water feature, except where the water is part of a recirculating system.
5) Potable water may not be used for outdoor irrigation during and forty-eight ( 48) hours following measurable precipitation.
6) No restaurant, hotel, cafe, cafeteria or other public place where food is sold, served or offered for sale shall serve drinking water to any customer unless requested. 7) Potable water may not be used to irrigate ornamental turf on public street medians. 8) Potable water may not be used to irrigate landscapes of new homes and buildings in a manner inconsistent with the requirements of the California Building Standards Commission and the Department of Housing and Community Development. 9) Operators of hotels and motels shall provide guests with the option of choosing not to have towels and linens laundered daily. Each hotel or motel shall prominently display notice ofthis option in each bathroom, using clear and understandable language. 10) Customers shall be notified by the City in the event the customer has a leak that is within the customer's control.
b) STAGE 2 WATER CONSERVATION PLAN
Under a stage 2 water conservation plan, in addition to the restrictions set forth in section 28- 52(a) above, the following actions are mandatory:
1) Landscape/turf irrigation shall only be permitted between 6:00 p.m. and 10: 00 a.m. 2) Residential and commercial turf/laws watering days are restricted to three ( 3) days per week from June 1 through September 15.
a) Properties located west of Eighth Street shall be permitted to water on Monday, Wednesday and Friday.
b) Properties located east of Eighth Street shall be permitted to water on Tuesday, Thursday and Saturday.
c) Adding water time to compensate for lost days is prohibited. 3) Residential and commercial turf/lawn watering days are restricted to two ( 2) days per week from September 16 through May 31.
a) Properties located west of Eighth Street shall be permitted to water on Monday and Friday.
b) Properties located east of Eighth Street shall be permitted to water on Tuesday and Saturday.
c) Adding water time to compensate for lost days is prohibited. 4) Outdoor irrigation of commercial, industrial and institutional facilities shall be restricted to the same watering days as residential irrigation and limited to between the hours of 6: 00 p.m. and 10: 00 a.m., according to a schedule determined by City staff following consultation with the customer. A commercial, industrial or institutional customer may implement an alternative water use reduction plan that achieves reductions in water use equivalent to those expected from the restrictions prescribed herein, if approved in advance by the director.
5) City parks and schools shall comply with the restrictions in subsection ( b)(4) of this section.
6) Potable water may not be used for construction, compaction, dust control, street or parking lot sweeping or building wash down where non -potable water is sufficient. 11/ 2016dfo%A16-0251Mater Conservation Ordinance 2

Page 435 of 758 ends

7) City customers are encouraged not to empty and refill swimming pools from June 1 through October 31 unless necessary to address a health or safety emergency. 8) City will establish water allocation in accordance with the City' s Water Shortage Contingency Plan for Stage 2 and corresponding drought penalty over the allocation. c) STAGE 3 WATER CONSERVATION PLAN
Under a stage 3 water conservation plans, in addition to the restrictions set forth in section 28- 52 above, the following actions are mandatory:
1) Water features such as fountains are not to be filled or replenished. 2) Vehicle washing is prohibited, except at facilities using recycled or recirculated water. 3) City will implement flow restrictors for wasters program. 4) City will establish water allocation in accordance with the City' s Water Shortage Contingency Plan for Stage 3 and corresponding drought penalty over the allocation. 5) City will implement Drought Rate Structure in accordance to the City' s Water Shortage Contingency Plan Stage 3.
d) STAGE 4 WATER CONSERVATION PLAN
Under a stage 4 water conservation plan, in addition to the restrictions set forth in section 28- 52 above, the following actions are mandatory:
1) Lawns are not to be watered
2) New construction meters will not be issued
3) City will establish water allocation in accordance with the City' s Water Shortage Contingency Plan for Stage 4 and corresponding drought penalty over the allocation. 4) City will implement Drought Rate Structure in accordance to the City' s Water Shortage Contingency Plan Stage 4.
e) STAGE 5 WATER CONSERVATION PLAN
Under a stage 5 water conservation plan, in addition to the restrictions set forth in section 28- 52 above, the following actions are mandatory:
1) City will establish water allocation in accordance with the City' s Water Shortage Contingency Plan for Stage 5 and corresponding drought penalty over the allocation. 2) City will implement Drought Rate Structure in accordance to the City' s Water Shortage Contingency Plan Stage 5.

Sec. 28- 53. — intentionally blank
Sec. 28- 54. - Water allocation.

It shall be unlawful to violate customer water rationing regulations, including regulations intended to preclude excessive water usage and specifying maximum water usage limitations.

Sec. 28- 55. - Administrative enforcement.
a) Penalties. The purpose of the administrative penalties assessed pursuant to this section is to assure future compliance with the provisions of this article by the customer who was cited through the imposition of penalties so as to create a meaningful disincentive to commit future violations of the provisions of this article. In acknowledgment ofthe fact that the City's water 1112016do1A16-02511Water Conservation Ordinance 3

Page 436 of 758 ends

is a scarce and irreplaceable commodity and that this article is intended to equitably distribute that commodity among water department customers and to assure that, to the extent feasible, City water is conserved and used only for purposes deemed necessary for public health and safety, the penalty schedule herein prescribed is not to be construed as creating a water pricing" structure pursuant to which customers may elect to pay for additional water at significantly higher rates. To this end, a customer's repeated violation of this article shall result in either the installation of a flow restriction device at the customer's cost or disconnection ofthe customer's property from the City's water service system. b) The enforcement agency and enforcement official may exercise any enforcement powers as provided in El Centro City Code chapter 18, articles X and XI, as may be necessary to effectively implement and enforce this article.
c) Any person, firm, partnership, association, corporation, political entity or other water department customer violating any provision of this article may be assessed an administrative citation by the City.
d) Administrative penalties for failure to comply with the water conservation regulations and restrictions set forth in this article are as follows:
1) Warning Notice: Written warning notice of violation and opportunity to correct violation.
2) First Citation: Offense within the preceding twelve ( 12) calendar months is punishable by administrative citation not to exceed one hundred dollars ($ 100.00) 3) Second Citation: Offense within the preceding twelve ( 12) calendar months is punishable by administrative citation not to exceed two hundred dollars ($200.00) 4) Third and Subsequent Citations: Offense within the preceding twelve ( 12) calendar months is punishable by administrative citation not to exceed one hundred dollars 500.00)
5) Commercial/industrial/institutional customers: Administrative citations shall be double the amounts set forth in this section.
6) Discontinuing service: In addition to any citations and the installation of a water flow restrictor, the director may disconnect a customer's water service for willful violations of mandatory restrictions and regulations in this article. Upon disconnection of water service, a written notice shall be served upon the customer which shall state the time, place, and general description ofthe prohibited or restricted activity and the method by which reconnection can be made.
e) Appeals and hearings shall be provided per E1 Centro City Code chapter 18, article XI SECTION 2. The City Council hereby designates the Office of the City Attorney to prepare a summary of this Ordinance and said summary shall be published and a certified copy of the full text ofthis Ordinance shall be posted in the Office ofthe City Clerk at least five (5) days prior to the City Council meeting at which this Ordinance is to be adopted.

SECTION 3. This Ordinance shall take effect thirty (30) days from and after its adoption. Within fifteen ( 15) days after adoption, it shall be published once in a newspaper, published and circulated within the City ofEl Centro, California.
11/ 2016do1A16-02511Water Conservation Ordinance 4

Page 437 of 758 ends

INTRODUCED at a regular meeting of the City Council of the City of El Centro California, held on the 7th day of Feb. , 2017.

PASSED AND ADOPTED at a regular meeting of the City Council of the City of El Centro, California, held on the 21st day of Feb. , 2017.

CITY OF E TRO
By:
ex Cardenas, Mayor
ATTEST:

ByD" 0-"
Dane Caldwell, City Clerk
APPROVED AS TO FORM:

Office ofthe City Attorney
By: 86Na&aA (5d . z4Q,(1t !. a '
Elizabeth L. Martyn, City Alfforney

STATE OF CALIFORNIA)
COUNTY OF IMPERIAL) ss

CITY OF EL CENTRO)
I, L. Diane Caldwell, City Clerk of the City of El Centro, California, do hereby certify that the foregoing Ordinance No. 17- 01 had its first reading on Feb. 7, 2017, and had its second reading on Feb. 21, 2017, and was passed by the following vote:

AYES: Jackson,
NOES: None
ABSENT: None
ABSTAINED: None
AYES: Jackson,
NOES: None
ABSENT: None
ABSTAINED: None
Silva, Cardenas, Viegas- Walker, Garcia
Silva, Cardenas, Viegas- Walker, Garcia
By
lane Caldwell, City Clerk
11/ 201WMA16-0251Mater Conservation Ordinance 5

Page 438 of 758 ends

APPENDIX D
Proof of Publication Notice for Public Hearing

Page 439 of 758 ends

APPENDIX E
Resolution No. 26-XX
Adopting 2025 UWMP and WSCP

Page 440 of 758 ends

APPENDIX F
Water Loss Audit Reports

Page 441 of 758 ends

Water Audit Report for:

Reporting Year:

All volumes to be entered as: MILLION GALLONS (US) PER YEAR Master Meter and Supply Error Adjustments
WATER SUPPLIED Pcnt: Value:

Volume from own sources: 3 2,461.344 MG/Yr 8 0.00% MG/Yr Water imported: n/a 0.000 MG/Yr 1 MG/Yr
Water exported: n/a 0.000 MG/Yr n/a MG/Yr
Enter negative % or value for under-registration
WATER SUPPLIED: 2,461.344 MG/Yr Enter positive % or value for over-registration .

AUTHORIZED CONSUMPTION
Billed metered: 5 2,315.408 MG/Yr
Billed unmetered: n/a 0.000 MG/Yr
Unbilled metered: n/a 0.000 MG/Yr Pcnt: Value:

Unbilled unmetered: 5 3.692 MG/Yr 1.25% 24061 MG/Yr
AUTHORIZED CONSUMPTION: 2,319.100 MG/Yr
WATER LOSSES (Water Supplied - Authorized Consumption) 142.244 MG/Yr Apparent Losses Pcnt: Value:

Unauthorized consumption: 6.153 MG/Yr 0.25% MG/Yr
Customer metering inaccuracies: 1 23.388 MG/Yr 1.00% MG/Yr Systematic data handling errors: 5.789 MG/Yr 0.25% MG/Yr Apparent Losses: 35.330 MG/Yr
Real Losses (Current Annual Real Losses or CARL)
Real Losses = Water Losses - Apparent Losses: 106.914 MG/Yr WATER LOSSES: 142.244 MG/Yr

NON-REVENUE WATER
NON-REVENUE WATER: 145.936 MG/Yr
= Water Losses + Unbilled Metered + Unbilled Unmetered

SYSTEM DATA
Length of mains: 6 120.0 miles
Number of active AND inactive service connections: 5 10,056 Service connection density: 84 conn./mile main
Yes
Average length of customer service line: ft
Average operating pressure: 6 60.0 psi

COST DATA
Total annual cost of operating water system: 10 $6,292,653 $/Year Customer retail unit cost (applied to Apparent Losses): 9 $3.75 Variable production cost (applied to Real Losses): 8 $276.27 $/Million gallons WATER AUDIT DATA VALIDITY SCORE:

PRIORITY AREAS FOR ATTENTION:
1: Volume from own sources
2: Customer metering inaccuracies
3: Billed metered
Average length of customer service line has been set to zero and a data grading score of 10 has been applied Are customer meters typically located at the curbstop or property line? AWWA Free Water Audit Software:

Reporting Worksheet

3.692
2020 1/2020 - 12/2020
City of El Centro (CA1310004)
*** YOUR SCORE IS: 51 out of 100 ***
A weighted scale for the components of consumption and water loss is included in the calculation of the Water Audit Data Validity Score Default option selected for Systematic data handling errors - a grading of 5 is applied but not displayed Based on the information provided, audit accuracy can be improved by addressing the following components:
$/100 cubic feet (ccf)
<----------- Enter grading in column 'E' and 'J' ----------> Default option selected for unauthorized consumption - a grading of 5 is applied but not displayed ?
?
?
?
?
? Click to access definition
?
?
?
?
?
?
Please enter data in the white cells below. Where available, metered values should be used; if metered values are unavailable please estimate a value. Indicate your confidence in the accuracy of the ?
?
?
?
?
?
(length of service line, beyond the property boundary,
that is the responsibility of the utility)
Use buttons to select
percentage of water
supplied
OR
value
Click here: ?
for help using option
?
?
?
?
+
+ Click to add a comment
WAS v5.0
+
+
+
+
+
+
American Water Works Association.
?
?
?
+
+
+
+
+
+
+
+
+
+
+
+
+ Use Customer Retail Unit Cost to value real losses
?
To select the correct data grading for each input, determine the highest grade where the utility meets or exceeds all criteria for that grade and all grades below it.

AWWA Free Water Audit Software v5.0 Reporting Worksheet 1

Page 442 of 758 ends

Water Audit Report for:

Reporting Year:

All volumes to be entered as: MILLION GALLONS (US) PER YEAR Master Meter and Supply Error Adjustments
WATER SUPPLIED Pcnt: Value:

Volume from own sources: 3 2,694.045 MG/Yr 8 0.00% MG/Yr Water imported: n/a 0.000 MG/Yr 1 MG/Yr
Water exported: n/a 0.000 MG/Yr n/a MG/Yr
Enter negative % or value for under-registration
WATER SUPPLIED: 2,694.045 MG/Yr Enter positive % or value for over-registration .

AUTHORIZED CONSUMPTION
Billed metered: 8 2,261.263 MG/Yr
Billed unmetered: n/a 0.000 MG/Yr
Unbilled metered: n/a 0.000 MG/Yr Pcnt: Value:

Unbilled unmetered: 5 4.041 MG/Yr 1.25% 24061 MG/Yr
AUTHORIZED CONSUMPTION: 2,265.304 MG/Yr
WATER LOSSES (Water Supplied - Authorized Consumption) 428.741 MG/Yr Apparent Losses Pcnt: Value:

Unauthorized consumption: 6.735 MG/Yr 0.25% MG/Yr
Customer metering inaccuracies: 1 22.841 MG/Yr 1.00% MG/Yr Systematic data handling errors: 5.653 MG/Yr 0.25% MG/Yr Apparent Losses: 35.229 MG/Yr
Real Losses (Current Annual Real Losses or CARL)
Real Losses = Water Losses - Apparent Losses: 393.512 MG/Yr WATER LOSSES: 428.741 MG/Yr

NON-REVENUE WATER
NON-REVENUE WATER: 432.782 MG/Yr
= Water Losses + Unbilled Metered + Unbilled Unmetered

SYSTEM DATA
Length of mains: 6 120.0 miles
Number of active AND inactive service connections: 5 10,115 Service connection density: 84 conn./mile main
Yes
Average length of customer service line: ft
Average operating pressure: 6 60.0 psi

COST DATA
Total annual cost of operating water system: 10 $8,071,823 $/Year Customer retail unit cost (applied to Apparent Losses): 9 $3.75 Variable production cost (applied to Real Losses): 8 $371.19 $/Million gallons WATER AUDIT DATA VALIDITY SCORE:

PRIORITY AREAS FOR ATTENTION:
1: Volume from own sources
2: Customer metering inaccuracies
3: Unauthorized consumption
Based on the information provided, audit accuracy can be improved by addressing the following components:
$/100 cubic feet (ccf)
<----------- Enter grading in column 'E' and 'J' ----------> Default option selected for unauthorized consumption - a grading of 5 is applied but not displayed *** YOUR SCORE IS: 54 out of 100 ***
A weighted scale for the components of consumption and water loss is included in the calculation of the Water Audit Data Validity Score Default option selected for Systematic data handling errors - a grading of 5 is applied but not displayed Average length of customer service line has been set to zero and a data grading score of 10 has been applied Are customer meters typically located at the curbstop or property line? AWWA Free Water Audit Software:

Reporting Worksheet

4.041
2021 1/2021 - 12/2021
City of El Centro (CA1310004)
?
?
?
?
?
? Click to access
?
?
?
?
?
?
Please enter data in the white cells below. Where available, metered values should be used; if metered values are unavailable please estimate a value. Indicate your confidence in the accuracy of the ?
?
?
?
?
?
(length of service line, beyond the property boundary,
that is the responsibility of the utility)
Use buttons to select
percentage of water supplied
OR
value
Click here: ?
for help using option
?
?
?
?
+
+ Click to add a comment
WAS v5.0
+
+
+
+
+
+
American Water Works Association.
?
?
?
+
+
+
+
+
+
+
+
+
+
+
+
+ Use Customer Retail Unit Cost to value real losses
?
To select the correct data grading for each input, determine the highest grade where AWWA Free Water Audit Software v5.0 Reporting Worksheet 1

Page 443 of 758 ends

Water Audit Report for:

Audit Year:

All volumes to be entered as: MILLION GALLONS (US) PER YEAR WATER SUPPLIED choose entry option:

VOS Volume from Own Sources: n g 2,751.000 MG/Yr n g 9 0.00% percent MG/Yr under-registration VOSEA WI Water Imported: n g n/a 0.000 MG/Yr n g n/a percent MG/Yr select….. WIEA WE Water Exported: n g n/a 0.000 MG/Yr n g n/a percent MG/Yr select….. WEEA 2,751.000 MG/Yr
.

AUTHORIZED CONSUMPTION
BMAC Billed Metered: n g 7 2,296.000 MG/Yr
BUAC Billed Unmetered: n g n/a 0.000 MG/Yr
UMAC Unbilled Metered: n g n/a 0.000 MG/Yr choose entry option:

UUAC Unbilled Unmetered: n g 3 5.740 MG/Yr 0.25% default MG/Yr 24061 Default option selected for Unbilled Unmetered, with automatic data grading of 3 2,301.740 MG/Yr
WATER LOSSES 449.260 MG/Yr
Apparent Losses
Default option selected for Systematic Data Handling Errors, with automatic data grading of 3 choose entry option:

SDHE Systematic Data Handling Errors: n g 3 5.740 MG/Yr 0.25% default MG/Yr CMI Customer Metering Inaccuracies: n g 1 0.000 MG/Yr percent MG/Yr under-registration UC Unauthorized Consumption: n g 3 5.740 MG/Yr 0.25% default MG/Yr Default option selected for Unauthorized Consumption, with automatic data grading of 3

11.480 MG/Yr
Real Losses
437.780 MG/Yr
449.260 MG/Yr

NON-REVENUE WATER
455.000 MG/Yr

SYSTEM DATA
Lm Length of mains: n g 8 120.0 miles (including fire hydrant lead lengths) Nc Number of service connections: n g 10 10,056 (active and inactive) Service connection density: 84 conn./mile main
Yes
Lp Average length of (private) customer service line: n g 10 ft (average distance between property line and meter) AOP Average Operating Pressure: n g 7 60.0 psi

COST DATA
CRUC Customer Retail Unit Charge: n g 5 $3.75
VPC Variable Production Cost: n g 10 $276.27 $/Million gallons $/yr (optional input) WATER AUDIT DATA VALIDITY TIER:
go to
dashboard
PRIORITY AREAS FOR ATTENTION TO IMPROVE DATA VALIDITY: KEY PERFORMANCE INDICATOR TARGETS:

Based on the information provided, audit reliability can be most improved by addressing the following components: OPTIONAL: If targets exist for the operational performance indicators, they can be input below:
1: Volume from Own Sources (VOS) Unit Total Losses: gal/conn/day 2: Customer Metering Inaccuracies (CMI) Unit Apparent Losses: gal/conn/day 3: Billed Metered (BMAC) Unit Real LossesA
: gal/conn/day
Unit Real LossesB
: gal/mile/day
If entered above by user, targets will display on KPI gauges (see Dashboard) go to start page
NON-REVENUE WATER:

If entering an
Error Adjustment,
select under- or overregistration
WATER SUPPLIED:

AUTHORIZED CONSUMPTION:

Apparent Losses:

Average length of customer service line has been set to zero and a data grading of 10 has been applied Click 'g' for 1 parameter(s), then complete all visible data grading questions to enable the Data Validity Score to calculate $/100 cubic feet (ccf)
$8,117,943
Total Annual Operating Cost
Are customer meters typically located at the curbstop/property line? AWWA Free Water Audit Software:

Worksheet
City of El centro
Water Supplied Error Adjustments
20232022
Real Losses:

WATER LOSSES:

Click 'g' to determine data validity grade
Click 'n' to add notes
FWAS v6.0
American Water Works Association.

To access definitions, click the input name
To edit water system info:

AWWA Free Water Audit Software v6.0 Worksheet 1

Page 444 of 758 ends

Water Audit Report for:

Audit Year:

All volumes to be entered as: MILLION GALLONS (US) PER YEAR WATER SUPPLIED choose entry option:

VOS Volume from Own Sources: n g 2,497.000 MG/Yr n g percent MG/Yr under-registration VOSEA WI Water Imported: n g 0.000 MG/Yr n g percent MG/Yr select….. WIEA WE Water Exported: n g 0.000 MG/Yr n g percent MG/Yr select….. WEEA 2,497.000 MG/Yr
.

AUTHORIZED CONSUMPTION
BMAC Billed Metered: n g 2,196.000 MG/Yr
BUAC Billed Unmetered: n g 0.000 MG/Yr
UMAC Unbilled Metered: n g 0.000 MG/Yr choose entry option:

UUAC Unbilled Unmetered: n g 3 5.490 MG/Yr 0.25% default MG/Yr 24061 Default option selected for Unbilled Unmetered, with automatic data grading of 3 2,201.490 MG/Yr
WATER LOSSES 295.510 MG/Yr
Apparent Losses
Default option selected for Systematic Data Handling Errors, with automatic data grading of 3 choose entry option:

SDHE Systematic Data Handling Errors: n g 3 5.490 MG/Yr 0.25% default MG/Yr CMI Customer Metering Inaccuracies: n g 0.000 MG/Yr percent MG/Yr under-registration UC Unauthorized Consumption: n g 3 5.490 MG/Yr 0.25% default MG/Yr Default option selected for Unauthorized Consumption, with automatic data grading of 3

10.980 MG/Yr
Real Losses
284.530 MG/Yr
295.510 MG/Yr

NON-REVENUE WATER
301.000 MG/Yr

SYSTEM DATA
Lm Length of mains: n g 120.0 miles (including fire hydrant lead lengths) Nc Number of service connections: n g 10,056 (active and inactive) Service connection density: 84 conn./mile main
Yes
Lp Average length of (private) customer service line: n g 10 ft (average distance between property line and meter) AOP Average Operating Pressure: n g 60.0 psi

COST DATA
CRUC Customer Retail Unit Charge: n g $3.75
VPC Variable Production Cost: n g $276.27 $/Million gallons $/yr (optional input) WATER AUDIT DATA VALIDITY TIER:
go to
dashboard
PRIORITY AREAS FOR ATTENTION TO IMPROVE DATA VALIDITY: KEY PERFORMANCE INDICATOR TARGETS:

Based on the information provided, audit reliability can be most improved by addressing the following components: OPTIONAL: If targets exist for the operational performance indicators, they can be input below:

Unit Total Losses: gal/conn/day
Unit Apparent Losses: gal/conn/day
Unit Real LossesA
: gal/conn/day
Unit Real LossesB
: gal/mile/day
If entered above by user, targets will display on KPI gauges (see Dashboard) go to start page
NON-REVENUE WATER:

If entering an
Error Adjustment,
select under- or overregistration
WATER SUPPLIED:

AUTHORIZED CONSUMPTION:

Apparent Losses:

Average length of customer service line has been set to zero and a data grading of 10 has been applied Click 'g' for 8 parameter(s), then complete all visible data grading questions to enable the Data Validity Score to calculate $/100 cubic feet (ccf)
$7,928,192
Total Annual Operating Cost
Are customer meters typically located at the curbstop/property line? AWWA Free Water Audit Software:

Worksheet
City of El Centro
Water Supplied Error Adjustments
20242023
Real Losses:

WATER LOSSES:

Click 'g' to determine data validity grade
Click 'n' to add notes
FWAS v6.0
American Water Works Association.

To access definitions, click the input name
To edit water system info:

AWWA Free Water Audit Software v6.0 Worksheet 1

Page 445 of 758 ends

Water Audit Report for:

Audit Year:

All volumes to be entered as: MILLION GALLONS (US) PER YEAR WATER SUPPLIED choose entry option:

VOS Volume from Own Sources: n g 3 2,621.000 MG/Yr n g 8 0.00% percent MG/Yr under-registration VOSEA WI Water Imported: n g n/a 0.000 MG/Yr n g n/a percent MG/Yr select….. WIEA WE Water Exported: n g n/a 0.000 MG/Yr n g n/a percent MG/Yr select….. WEEA 2,621.000 MG/Yr
.

AUTHORIZED CONSUMPTION
BMAC Billed Metered: n g 7 2,079.114 MG/Yr
BUAC Billed Unmetered: n g n/a 0.000 MG/Yr
UMAC Unbilled Metered: n g 4 99.977 MG/Yr choose entry option:

UUAC Unbilled Unmetered: n g 3 5.198 MG/Yr 0.25% default MG/Yr 24061 Default option selected for Unbilled Unmetered, with automatic data grading of 3 2,184.289 MG/Yr
WATER LOSSES 436.711 MG/Yr
Apparent Losses
Default option selected for Systematic Data Handling Errors, with automatic data grading of 3 choose entry option:

SDHE Systematic Data Handling Errors: n g 3 5.198 MG/Yr 0.25% default MG/Yr CMI Customer Metering Inaccuracies: n g 1 67.395 MG/Yr 3.00% percent MG/Yr under-registration UC Unauthorized Consumption: n g 3 5.198 MG/Yr 0.25% default MG/Yr Default option selected for Unauthorized Consumption, with automatic data grading of 3

77.790 MG/Yr
Real Losses
358.921 MG/Yr
436.711 MG/Yr

NON-REVENUE WATER
541.886 MG/Yr

SYSTEM DATA
Lm Length of mains: n g 8 120.0 miles (including fire hydrant lead lengths) Nc Number of service connections: n g 10 10,056 (active and inactive) Service connection density: 84 conn./mile main
Yes
Lp Average length of (private) customer service line: n g 10 ft (average distance between property line and meter) AOP Average Operating Pressure: n g 7 60.0 psi

COST DATA
CRUC Customer Retail Unit Charge: n g 7 $3.75
VPC Variable Production Cost: n g 9 $276.27 $/Million gallons $/yr (optional input) WATER AUDIT DATA VALIDITY TIER:
go to
dashboard
PRIORITY AREAS FOR ATTENTION TO IMPROVE DATA VALIDITY: KEY PERFORMANCE INDICATOR TARGETS:

Based on the information provided, audit reliability can be most improved by addressing the following components: OPTIONAL: If targets exist for the operational performance indicators, they can be input below:
1: Volume from Own Sources (VOS) Unit Total Losses: gal/conn/day 2: Customer Metering Inaccuracies (CMI) Unit Apparent Losses: gal/conn/day 3: Billed Metered (BMAC) Unit Real LossesA
: gal/conn/day
Unit Real LossesB: gal/mile/day
If entered above by user, targets will display on KPI gauges (see Dashboard) Are customer meters typically located at the curbstop/property line? AWWA Free Water Audit Software:

Worksheet
City of El Centro
Jan 01 2024 - Dec 31 2024
Water Supplied Error Adjustments
Calendar2024
Real Losses:

WATER LOSSES:

Average length of customer service line has been set to zero and a data grading of 10 has been applied A weighted scale for the components of supply, consumption and water loss is included in the calculation of the Water Audit Data Validity Score *** The Water Audit Data Validity Score is in Tier III (51-70). See Dashboard tab for additional outputs. *** $/100 cubic feet (ccf)
$4,471,213
Total Annual Operating Cost
go to start page
NON-REVENUE WATER:

If entering an
Error Adjustment,
select under- or overregistration
WATER SUPPLIED:

AUTHORIZED CONSUMPTION:

Apparent Losses:

Click 'g' to determine data validity grade
Click 'n' to add notes
FWAS v6.0
American Water Works Association.

To access definitions, click the input name
To edit water system info:

AWWA Free Water Audit Software v6.0 Worksheet 1

Page 446 of 758 ends

2025 Urban Water Management Plan and Water Shortage Contingency Plan

CITY OF EL CENTRO NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that a public hearing will be held before the City of El Centro City Council in the City Council Chambers, 1275 W. Main Street, El Centro California 92243 on Tuesday, September 1, 2026 at 6:00 p.m. (or as soon thereafter as the agenda permits) to consider the resolution of intent to adopt the City’s 2025 Urban Water Management Plan and Water Shortage Contingency Plan.

The 2025 Urban Water Management Plan (UWMP) update is prepared in accordance with the California Urban Water Management Planning Act and the Water Conservation Act of 2009 (collectively, the “Act”).

The Act requires urban water suppliers providing water to more than 3,000 customers to adopt a UWMP every 5 years. This plan describes the city’s water deliveries and uses, water supply sources, and water conservation measures.

Any person may submit written comments to the City Council before the hearing or may appear and be heard before the City Council of the City of El Centro at the time of the hearing. At the hearing or during deliberations, the City Council could approve a modified plan or changes to the plan proposed.

A copy of the DRAFT 2025 UWMP may be reviewed during regular business hours at the El Centro City Clerk’s Office located at 1275 W. Main Street, El Centro, CA 92243, or by visiting the City website at www.cityofelcentro.org, selecting Public Works Department, and selecting “Draft 2025 UWMP” on the left of the screen. Further information concerning this matter may be obtained by contacting the Public Works Department at 760.337.4505
Norma Wyles, CMC
City Clerk

Page 447 of 758 ends
Page 448 of 758 ends

City Council of the City of El Centro
1275 W. Main Street
El Centro, CA 92243

SUBMITTED
ACTION ITEM (ID # 2026-312)
Item: 16.

Meeting: 9/1/2026 3:00 PM
Department: Community Services
Category: Action Item
Prepared by: Adriana Nava,
Community Services Director
Department Head: Adriana Nava
DOC ID: 2026-312
Approval of Call for Graphic Artists "Love Your Community" Public Art Project Guidelines.

CITY MANAGER'S RECOMMENDATION:

Approval of the Call for Graphic Artists Guidelines for the “Love Your Community” Public Art Project and authorize staff to proceed with the artist solicitation and selection process.

FISCAL IMPACT:

A Clean California Grant was sought by City Staff and was awarded in the amount of $4,782,000. The implementation of the proposed program would be paid for through the grant.

STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:

City Beautification, Engagement & Civic Pride
Economic Opportunity
Environmental Sustainability & Infrastructure
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE

DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTOR'S LICENSE, REFERENCE CHECKS, INSURANCE, ETC.:

Not applicable.

BACKGROUND:

As part of the Clean California Grant community input process, residents identified the need for secure, tamper-resistant trash receptacles as a priority for improving cleanliness in Downtown El Centro. In response to this feedback, the City used Clean California Grant funds to purchase eight Bigbelly Smart Max Duo waste and recycling stations.

The eight stations are configured in pairs of two and will be installed at locations throughout Main Street from 4th Street to 8th Street. The fully enclosed, solar-powered stations feature compaction and monitoring technology that increase capacity, help City staff determine when collection is needed and reduces the potential for overflowing receptacles and windblown litter.

In addition to improving waste collection, the stations provide an opportunity to incorporate public art into functional City infrastructure. Selected artwork will be reproduced as durable vinyl wraps and installed on designated exterior faces of the stations. The art wraps will transform these functional public amenities into colorful and engaging expressions of El Centro’s identity, culture, and community pride.

The example below identifies Bigbelly trash receptacles covered in vinyl art.

Page 449 of 758 ends

DISCUSSION:

The proposed Call for Graphic Artists Guidelines establish the eligibility, submission, artwork and selection requirements for the “Love Your Community” Public Art Project. The project invites artists to submit original, joyful and community-centered artwork celebrating the people, places, culture, traditions, natural environment and shared experiences that make El Centro special. Artwork may also encourage residents and visitors to help keep the community clean, welcoming and beautiful.

The City anticipates selecting up to eight original designs from up to eight different artists, with one design featured on each Bigbelly Smart Max Duo station. Artists may submit up to three concepts; however, no more than one design may be selected from each artist. Each selected artist will receive a flat graphic design fee of $1,500, for a maximum total of $12,000 in artist compensation. The City will separately cover the cost of producing and installing the vinyl wraps.

Submissions will be evaluated based on their connection to the project theme, originality, creativity, artistic quality, suitability for a public and family-friendly setting, connection to El Centro and compatibility with the stations’ technical requirements. The selection process may also consider the overall variety and balance of the designs to represent a range of artistic styles, perspectives and community experiences.

The Guidelines require all artwork to be conceived and created by the submitting artist.

Artwork created or modified using generative artificial intelligence will not be eligible.

Selected artists must provide print-ready files, complete up to two rounds of reasonable revisions and authorize the City to reproduce and use the artwork for installation, governmental, educational, promotional and community outreach purposes. Artists will retain the copyright to their original artwork.

Approval of the Call for Graphic Artists Guidelines will allow the City to solicit and evaluate artwork for the “Love Your Community” Public Art Project through a clear and consistent process. The project will support artists, enhance the appearance of new waste and recycling stations and use public art to promote community pride and stewardship.

CONCLUSION:

Staff recommends that the City Council approve the Call for Graphic Artists Guidelines for the “Love Your Community” Public Art Project and authorize staff to proceed with the artist solicitation and selection process.

ATTACHMENTS:

Page 450 of 758 ends

1. Call for Graphic Artists_8-26-26

Page 451 of 758 ends

CALL FOR

GRAPHIC

ARTISTS
Public Art
Project

GUIDELINES
Lo
rC
muni

Page 452 of 758 ends

1 City of El Centro

CALL FOR GRAPHIC ARTISTS
“Love Your Community” Public Art Project
The City of El Centro invites graphic artists to submit original artwork for the “Love Your Community” Public Art Project.

As part of the Clean California Grant community input process, residents identified the need for secure, tamper-resistant trash receptacles as a priority for improving cleanliness in Downtown El Centro. In response to this feedback, the City used Clean California Grant funds to purchase eight Bigbelly Smart Max Duo waste and recycling stations.

The eight stations are configured in pairs of two and will be installed at locations throughout Main Street from 4th Street to 8th Street. The fully enclosed, solar-powered stations feature compaction and monitoring technology that increase capacity, help City staff determine when collection is needed and reduce the potential for overflowing receptacles and windblown litter.

In addition to improving waste collection, the stations provide an opportunity to incorporate public art into functional City infrastructure. Selected artwork will be reproduced as durable vinyl wraps and installed on designated exterior faces of the stations. The art wraps will transform these functional public amenities into colorful and engaging expressions of El Centro’s identity, culture, and community pride.

The City anticipates selecting up to eight artists and eight original designs. Each selected design will be featured on one Bigbelly Smart Max Duo station. Each selected artist will receive a graphic design fee of $1,500.

Artists may submit up to three design concepts; however, no more than one design will be selected from each artist.

Project Theme꞉ “Love Your Community”
Artists are encouraged to create joyful, uplifting and thought-provoking artwork that reflects what it means to love and care for the El Centro community.

Artwork should celebrate the people, places, culture, traditions, natural environment or shared experiences that make El Centro special. Designs may also encourage residents and visitors to help keep the community clean, welcoming and beautiful.

Page 453 of 758 ends

2 As part of the City’s efforts to celebrate and strengthen El Centro’s architectural identity, artists are encouraged to draw inspiration from Art Deco architecture and design. Artwork may incorporate Art Deco elements, such as bold geometric patterns, streamlined forms, symmetry and decorative motifs, while complementing the project’s broader “Love Your Community” theme.

Artists should use the approved Art Deco color palette provides in these guidelines to create a cohesive visual identity across all installations. Designs should remain within the designated palette and use its colors in a manner that supports readability, visual balance and consistency.

Designs should reflect a contemporary interpretation of Art Deco that feels vibrant, welcoming and uniquely connected to El Centro.

Artists may consider the following questions for inspiration:
• What do you love about your community?
• What makes El Centro special to you?
• What about El Centro uplifts or inspires you?
• What makes you feel alive while in El Centro?
• How can we show love for our community.
• How can we work together to keep El Centro clean and beautiful? • What people, places, traditions or experiences represent the spirit of El Centro? • What does a joyful, connected and cared-for community look like? These questions are intended as creative prompts. Artists are not required to answer each question directly.

Project Opportunity

Page 454 of 758 ends

3 The City anticipates selecting up to eight original graphic designs from up to eight different artists.

Each selected design will be assigned to one Bigbelly Smart Max Duo station.

Each artist may submit up to three separate design concepts for consideration. However, no more than one design will be selected from any individual artist.

The artwork will be installed as a vinyl wrap on designated exterior panels of the paired waste and recycling units. Because the stations include doors, openings, handles, instructional labels and operational components, artwork must be created using the graphic templates and specifications provided by the City.

The City will be responsible for producing and installing the final vinyl graphics. Selected artists will be responsible for providing print-ready digital files that comply with the dimensions and technical specifications provided by the City.

The City may work with selected artists to make minor adjustments necessary for printing, placement, visibility or installation.

Artist Compensation
Each selected artist will receive a flat graphic design fee of $1,500.

The fee includes:
• Development of one selected original graphic design
• Preparation and delivery of the final print-ready artwork • Up to two rounds of reasonable revisions requested by the City • Permission for the City to reproduce, display and promote the selected artwork as described in these guidelines
The City will pay all printing and installation costs separately.

Payment will be issued following completion and acceptance of the final design and receipt of all required agreements, forms and vendor documentation. Artists whose submissions are not selected will not receive compensation.

Eligibility
• This opportunity is open to artists residing in Imperial County. • Final selected artwork must be provided in the digital format required for vinyl production. • Artists younger than 18 years of age may apply only with the written consent of a parent or legal guardian.

Page 455 of 758 ends

4 • City employees, selection panel members and their immediate family members are not eligible to apply.
• No previous public art experience is required.

Submission Requirements
Each artist may submit up to three design concepts. Each concept will be evaluated separately. No more than one design will be selected from any individual artist.

Each Artist must submit the following:

1. Artist’s full name, mailing address, telephone number and email address

2. A brief artist biography of no more than 150 words

3. One to three examples of previous artwork or a link to an online portfolio

4. A color rendering or digital mock-up for each proposed design concept

5. A brief description of each proposed design and its connection to the “Love Your Community” theme

6. A completed originality and artificial intelligence certification

7. Any additional forms required by the City
Submissions must be received by the established deadline. Incomplete or late submissions may not be considered.

Artwork Requirements
All proposed artwork must:
• Be original and created by the submitting artist
• Clearly relate to the “Love Your Community” theme
• Be joyful, welcoming and appropriate for display in a public, family-friendly setting • Be visually engaging when viewed from a distance
• Complement the shape and functional elements of the Bigbelly Smart Max Duo station • Create a visually cohesive appearance across the paired waste and recycling units • Be suitable for reproduction as a large-format vinyl graphic • Follow the graphic templates and technical specifications provided by the City

Page 456 of 758 ends

5 • Avoid placing important design elements where they may be obscured by doors, openings, handles, labels or other equipment
• Not interfere with required waste and recycling labels or operating instructions • Not contain commercial advertising, business names, product branding or promotional messages
• Not contain political campaign messages or endorsements • Not contain copyrighted images, characters, logos or other materials owned by another person or organization without documented permission
• Not contain profanity, discriminatory content, graphic violence, sexually explicit imagery or content that could reasonably be considered threatening or inappropriate for public display • Not create a safety concern or interfere with the operation or visibility of the stations The City reserves the right to determine whether a proposed design is appropriate for the project and public display.

Original Artwork and Artificial Intelligence Policy
All submitted artwork must be conceived and created by the submitting artist.

Artwork created in whole or in part using generative artificial intelligence is not eligible. This includes using artificial intelligence tools to generate, modify, complete, enhance or substantially transform images, illustrations, backgrounds or other visual elements included in the submission.

Standard digital design tools may be used for drawing, coloring, layout, resizing and preparing artwork for production, provided the creative work is performed by the artist and is not generated by artificial intelligence.

By submitting artwork, the artist must certify that:
• The artwork is the artist’s own original work
• Generative artificial intelligence was not used to create or modify the artwork • The artwork does not infringe upon any copyright, trademark or other intellectual property right
• The artist can provide reasonable documentation of the creative process if requested, including sketches, drafts, source files or progress images The City may disqualify a submission or withdraw a selection if it determines that the artwork was generated through artificial intelligence or otherwise violates the originality requirements.

Selection Criteria

Page 457 of 758 ends

6 Submissions will be evaluated based on the following:
• Connection to the “Love Your Community” theme
• Originality and creativity
• Joyful, uplifting and community-centered message
• Visual appeal and overall artistic quality
• Appropriateness for a public and family-friendly setting • Connection to El Centro’s people, culture, history, environment or sense of place • Ability to translate successfully into a vinyl art wrap • Ability to work cohesively across the paired waste and recycling units • Visibility and impact when displayed on a Bigbelly Smart Max Duo Station • Compliance with the submission and technical requirements The City may also consider the overall variety and balance of the selected designs to ensure the completed project represents a range of perspectives, styles and community experiences.

Selection decisions will be final. The City reserves the right to select fewer than eight designs or decline to select any submission if the proposals do not meet the project’s needs.

Project Timeline
• Call for Artist Opens: [Date]
• Submission Deadline: [Date-two weeks after opening]
• Artist Selection and Notification; [Date]
• Final Artwork and Required Revisions Due: [Date]
• Anticipated Printing and Installation: [Date]
Artists will have approximately two weeks from the opening of the Call for Artist to prepare and submit their proposals. Late submissions will not be accepted unless the City formally extends the deadline.

Ownership and Use of Artwork
The artist will retain the copyright to the original artwork.

By accepting the $1,500 design fee, each selected artist grants the City of El Centro a perpetual, irrevocable and royalty-free license to reproduce, print, install, display, photograph, publish and use the artwork for governmental, educational, promotional and community outreach purposes in

Page 458 of 758 ends

7 print and digital formats. The City may resize, crop, wrap or make other minor technical adjustments necessary to fit the Bigbelly Smart Max Duo stations and accommodate printing or installation requirements. The City will not make substantial artistic changes without first consulting the artist when reasonably possible.

Artist credit will be provided in connection with the project when practical. The City is not responsible for damage, fading, vandalism, removal, replacement or the length of time the vinyl artwork remains on display.

Submission Instructions
Submit all required materials electronically to:

Contact꞉ [Name and Tittle]
Email꞉ [Email Address]
Email Subject꞉ Love Your Community Artist Submission – [Artist Name] Submissions must be received no later than:
[Time] on [Day, Date]
Files should be submitted in [PDF/JPG/PNG] format. If files are too large to email, artist may submit them through Dropbox.

Each design concept should be clearly labeled with the artist’s name and a design number or title.

Questions regarding the project may be directed to [contact name] at [email address] or [telephone number].

Additional Conditions
• Submission of artwork does not guarantee selection.
• Artists may submit up to three design concepts, but no more than one design may be selected from each artist.
• Artists are responsible for all costs associated with preparing and submitting a proposal. • Selected artist may be required to enter into an agreement with the City and submit applicable tax and vendor documentation.
• Selected artwork will be subject to final review and approval by the City. • The City reserves the right to request revisions to ensure compatibility with the project theme, public setting and production specifications.
• Failure to complete the final artwork or requested revisions by the established deadline may result in withdrawal of the selection.

Page 459 of 758 ends

8 • The City reserves the right to modify the schedule, extend the submission deadline, reject any or all submissions, or cancel the project at its discretion.

ATTACHMENTS
• Graphic Artist Application
• Bigbelly Wrap Specifications & Art Requirements
• Bigbelly Information Sheets

Page 460 of 758 ends

Love Your Community – Artist Application Form
Artist Full Name:

Mailing Address:

Telephone Number:

Email Address:

Artist Biography (150 words):

Portfolio Link or Files:

Design Concept 1 Description:

Design Concept 2 Description:

Design Concept 3 Description:

Originality & AI Certification:

I certify that:

This artwork is my own original work.

Generative AI was not used to create or modify the artwork.

The artwork does not infringe on any copyright or trademark.

Electronic Signature:

Date:

Page 461 of 758 ends

BB6 Wrap Specifications & Art Requirements
Wraps may be applied to the unshaded areas above.

Acceptable PC & Mac File Formats
• EPS - Any type including Illustrator or Photoshop
• AI - Adobe Illustrator
• PSD - Photoshop, any format
• PDF - Adobe Acrobat
• TIFF - Tagged Image File Format
Bleed Requirement
An overall artwork bleed of 1/2 - 1 inch on all sides is required. Artwork that does not provide this bleed may not fit correctly.

Image & Font Requirements
• Include files for all images that have been placed or imported into the final layout. This is important to the quality of the final print.
• Include any custom fonts with your submission if
possible. Otherwise, send all fonts converted to
outlines, curves, or line art.
• Ensure placed or imported Images are no less than
100 dpi (dots per inch) at final output size.

Print Material Specifications
• Vinyl Wrap: Metamark MDPHB-200
• Laminate: Metamark MG-302
• Digital print using UV-cured, UV-stable inks only.

Solvent-based and eco-solvent inks are not permitted.

Ink must be fully cured before laminating and cutting.

Color Specifications
• Whenever possible send the art file in "layers." This allows color corrections to be made as needed.
• Specify the PMS Pantone color of any required colors
both in the file and on the hard copy proof.
• Color swatches are an acceptable substitute to PMS
and will be matched as closely as possible.
• If colors are not specified, it will be assumed that color match is not critical.

File Submission
• Contact your Bigbelly Account Manager to control the
submission process.

For Further Assistance
• Please contact your Bigbelly Account Manager or
Bigbelly Support (+1.888.820.0300).
1 LABBB60085 - Rev. 1 - February 2026

Page 462 of 758 ends

Bigbelly Smart Max
Built on Bigbelly’s fundamentally better bin, the Smart Max is a 150-gallon (570 L) capacity, compacting bin that is CLEANTM connected—ideal for geographically spread-out deployments or where collections reduction is important. The Smart Max can be deployed standalone or in combination with any other Bigbelly bin type to form a multi-stream kiosk.

With its fully-enclosed Hopper disposal interface, the Smart Max is uniquely equipped to keep waste contained and out of sight, even from trash pickers. The integrated compactor provides 5-10x greater capacity compared to traditional waste bins and is designed for high-waste volume locations.

The Smart Max is equipped with sensors that monitor and report fullness level, collection activity, bin status, and GPS location. All information is communicated to Bigbelly’s CLEANTM Management Console and CLEANTM Mobile, enabling streamlined and
measurable waste management operations. The built-in LEDs on the front of the bin also indicate fullness status. The bin can be solar-powered for outdoor use or AC-powered for indoor use.

FULLY ENCLOSED

FULLNESS INDICATOR

CLEANTM CONNECTED

COMPACTOR
Technical Specifications
Waste Interfaces and Streams
Hopper, Chute, Waste, Single-Stream Recycling,
or Compost
www.bigbelly.com | [email protected] | +1 888 820 0300 | © Big Belly Solar LLC 2025 Hopper Disposal Interface
with Foot Pedal
Chute Disposal Interface
with Foot Pedal
Overall Machine Dimensions
Disposal Interface Dimensions
• Height: 49.8” (1264 mm)
• Width: 25” (635 mm)
• Depth: 26.8” (681 mm)
• Handle Height (ADA Compliant): 41.8” (1062 mm)
• Weight: 260 lbs (118 kg)
• Shipping Weight: 290 lbs (132 kg)
• Bin Volume (Hopper or Chute): 32 gal (120 L)
compacted trash; approx. 150 gal (568 L)
uncompacted trash.
• Bin Dimension: 24” x 20.4” x 21.65”
(609 mm x 518 mm x 549 mm)
• Hopper Opening: 15”W x 5”H x 6”D
(381 mm x 127 mm x 152 mm)
• Chute Opening: 15"W x 7"H x 15”D
(381 mm x 178 mm x 381 mm)
Bigbelly Smart Max

Page 463 of 758 ends

www.bigbelly.com | [email protected] | +1-781-444-6002 | © 2023 Bigbelly Technical Specifications - Continued
Safety Features
Durability
Materials
• Weather-resistant, UV-stabilized polyester powder-coat finish on all exterior parts • Electronic components temperature range of -40°F to +185°F (-40°C to +85°C) • Fully weatherized; in the event of a flood, the bin can withstand:
- Up to 20” (508 mm) of water without harming the electronics - Up to 36” (915 mm) of water with only minor damage to electronics • RoHS compliant
• Galvanized sheet metal steel interior and exterior construction • Heavy-duty, recycled plastic side panels for dent and scratch resistance • Leak-proof interior bin made of low-density polyethylene (LDPE) plastic Power and Electronics
• Average operation uses less than 3 Wh energy per day, ensuring performance in any location, including in shade and under cloud cover • Patented Skip-a-CycleTM energy management technology protects against battery damage
• 28 Ah sealed lead acid, maintenance-free extended life battery with insulation for optimized performance (up to 5-year)
• Solar panel (40 W)
• Solar panel protected by polycarbonate bubble
• Self-powered unit requires no wiring
Options and Accessories
• Chute disposal interface
• Custom Graphic Wraps, Message Panels, and Stickers
• Wheeled Interior Lift Bin (bar and comb styles)
• AC Adapter for indoor use
• Bigbelly ACS (Access Control System) for keyless access control • Ashtray and Stub-out Plates
• Remote Lock for Chute or Hopper disposal interface
• Security Management System with Physical Plates
• Odor Mask
• CE marked
• Hopper disposal interface provides a physical barrier between the user and the compacting mechanism
• Soft-open Hopper response with use of Foot Pedal
• Interlocked access doors protect users and service personnel • Collection door automatically locks when closed
• No pinch points, sharp edges, or corners
Bigbelly Smart Max Features
• Bigbelly’s fully-enclosed Hopper disposal interface, standard on Smart Max bins, eliminates visible waste, rat and pest access, and windblown litter, and prevents strewn litter caused by trash picking. The Hopper incorporates a 70° dump angle which reduces waste disposal jams.
• Fully-automated and microprocessor-controlled, the Smart Max communicates its information and status to Bigbelly’s CLEANTM Management Console and CLEANTM Mobile via a built-in telecom data link.
• Embedded sensors detect fullness level, overflows, Hopper activity, and front door openings. The bin’s location is established and monitored by onboard GPS. • LED indicators on the front of the Smart Max display readiness to collect status (fullness level or age of waste), machine status, and error codes. • Unique built-in compaction technology delivers 5-10x compaction ratio due to superior compaction penetration (ram travels to 9" from bottom of bin). • The integrated Foot Pedal provides hands-free use.
www.bigbelly.com | [email protected] | +1 888 820 0300 | © Big Belly Solar LLC 2025 Smart Max Product Sheet 2503 Page 464 of 758
City Council of the City of El Centro
1275 W. Main Street
El Centro, CA 92243

SUBMITTED
ACTION ITEM (ID # 2026-238)
Item: 17.

Meeting: 9/1/2026 3:00 PM
Department: Public Works
Category: Action Item
Prepared by: Luis Alonzo, Assistant
Engineer
Department Head: Abraham Campos
DOC ID: 2026-238
Approve ATP Cycle VI Plans and Specifications and authorize for public bidding.

CITY MANAGER'S RECOMMENDATION:

Approve ATP Cycle VI Plans and Specifications and authorize public bidding.

FISCAL IMPACT:

No Impact to the General Fund
State-Only (ATP) Local Match (LTA Measure D) Total
$1,200,00.00 $2,014,500.00 $3,214,500.00
Budget includes a 10% Contingency, funded by both State ATP Funds and Local LTA Measure D Funds.

STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:

Environmental Sustainability & Infrastructure
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE

DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTOR'S LICENSE, REFERENCE CHECKS, INSURANCE, ETC.:

N/A
BACKGROUND:

Engineering staff applied for Active Transportation Program (ATP) State funding, and the City was granted $1,200,000.00 in ATP funding for pedestrian improvements at various locations throughout El Centro, including Main Street from Solano Avenue to 14th Street; 12th Street from Ross Avenue to Wensley Avenue; Holt Avenue/Orange Avenue from Fairfield Drive to 2nd Street; and 2nd Street from Orange Avenue to State Street.

On August 4, 2026, the City Council approved the Program Supplement Agreement with the California Department of Transportation (Caltrans).

DISCUSSION:

The project was designed by Typsa consultants and is now ready to be advertised for construction bids. The plans and specifications have been completed in accordance with Caltrans Local Assistance requirements and City design standards. The work includes the following pedestrian and ADA improvements:

1. Curb, gutter, and sidewalk where missing along Main Street between Solano Avenue and 14th Street.

2. Curb extensions and a new crosswalk with Rectangular Rapid Flashing Beacons (RRFB) at 14th Street and State Street, to replace the existing mid-block crosswalk in front of the Economic Development building.

3. Curb, gutter, sidewalk, and ADA ramps along 12th Street between Ross Avenue and Wensley Avenue.

Page 465 of 758 ends

4. ADA ramps at the following intersections: 10th/Sandalwood, 10th/Ross, 10th/Wensley, 10th/Lenrey, 2nd/Holt, 2nd/Orange, 2nd/Brighton, 2nd/Olive, 1st/Holt, 1st/Olive, 1st/Orange, Holt/Fairfield, Orange/Fairfield, State/Fairfield, and Olive/Fairfield.

5. Curb, gutter, and sidewalk in the gap area along 2nd Street, north of Olive Avenue.

Upon Council approval of the plans and specifications, staff will advertise the project for bids in accordance with the California Public Contract Code and Caltrans Local Assistance procurement requirements. Staff will return to Council at a future meeting to request award of the construction contract.

CONCLUSION:

Approve ATP Cycle VI Plans and Specifications and authorize for public bidding.

ATTACHMENTS:

1. ATP Cycle 6 Vol 1 Specs

2. ATP Cycle 6 Vol 2 Specifications

3. ATP Cycle 6 Plans_Reduced

Page 466 of 758 ends

City of El Centro, California
Bid Proposal, Contract Documents and Specifications
for
ATP CYCLE 6 IMPROVEMENTS PROJECT
ATPSB1L-5169 (065)
Volume 1 of 2
For use in conjunction with “Standard Specification for Public Works Construction,” 2024 Edition, together with subsequent annual supplements as published by Building News, Inc.

APPROVED:
__________________________________
Abraham Campos, P.E.

Director of Public Works/City Engineer
August 2026

Page 467 of 758 ends

ATP CYCLE 6 IMPROVEMENTS PROJECT
ATPSB1L-5169 (065)

TABLE OF CONTENTS
PAGE
VOLUME 1 OF 2
NOTICE INVITING SEALED PROPOSALS (BIDS) NIB 1 - 6
BIDDING DOCUMENTS BD 1 - 23
CONTRACT DOCUMENTS CD 1 - 36
Agreement
Performance Bond
Payment Bond
Public Contract Code Section 22300
Public Contract Code Section 9204
GENERAL CONDITIONS GC 1 - 67
SUPPLEMENTAL GENERAL CONDITIONS SGC 1 - 2
VOLUME 2 OF 2
SPECIFICATIONS S 1 - 2
SPECIAL PROVISIONS SP 1 – 56

Page 468 of 758 ends

NIB 1
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

NOTICE INVITING BIDS
PROJECT TITLE: ATP CYCLE 6 IMPROVEMENTS PROJECT ATPSB1L-5169 (065) RECEIPT OF BIDS: The City of El Centro (“City” or “OWNER”) will accept sealed Bids for the ATP Cycle 6 Improvements Project ATPSB1L-5169 (065) (“Project”) at the office of the City Clerk located at 1275 Main Street, El Centro, CA 92243, until 2:00 p.m. on October 8, 2026.

DESCRIPTION OF WORK: The WORK includes but is not limited to:

Constructing improvements along various roadways and intersections in the City. Each location will have various improvements, which include but are not limited to the addition of curb, gutter, sidewalk, concrete curb ramps, installation of a Rectangular Rapid Flashing Beacon (RRFB), high visibility crosswalks, and general ADA improvements. All locations with concrete or asphalt work, will require removal of existing facilities that will be removed and replaced.

SITE OF WORK: The site of the WORK is located within the City of El Centro at various locations.

COMPLETION OF WORK: The WORK must be completed within one hundred and twenty (120) Days after the commencement date stated in the Notice to Proceed.

OPENING OF BIDS: The Bids will be publicly opened and read at 2:00 p.m. on October 8, 2026, at the office of the City Clerk located at 1275 Main Street, El Centro, CA 92243.

OBTAINING CONTRACT DOCUMENTS: The Contract Documents are entitled “ATP CYCLE 6 IMPROVEMENTS PROJECT ATPSB1L-5169 (065)”
The Contract Documents are available through Planet Bids, by accessing our website (www.cityofelcentro.org) and selecting “GOVERNMENT> PUBLIC WORKS> BIDS & PROPOSALS> PROCEED TO SITE”from the drop down menu or by visiting https://pbsystem.planetbids.com/portal/41180/portal-home MANDATORY PRE-BID CONFERENCE: Bidders are required to attend a pre-bid meeting, which will be conducted by City’s CONSTRUCTION MANAGER at 10:00 A.M. on September 18, 2026. The meeting will be held at the City of El Centro, Public Works Conference Room located at 307 W. Brighton Avenue, El Centro, CA 92243. The object of the meeting is to acquaint Bidders with the site conditions and mandatory bidding requirements and subcontractors of subcontracting and material supply opportunities. At that meeting, City’s Equal Opportunity Program goals and reporting procedures will be discussed.

Page 469 of 758 ends

NIB 2
07/2026/cdz/A26-0136/ATPCycle6ImprovProj
QUESTIONS: Technical questions should be directed to the CONSTRUCTION MANAGER through the Planet Bids portal. Should the Planet Bids portal be unavailable, questions should then be directed to the OWNER at
Questions must arrive at least ten (10) Days prior to the bid opening to allow time for distributing answers and/or clarifications to plan holders.

CITY’S RESPONSES: Responses to questions that may be asked will be provided by written Addenda through the Panet Bids portal. All such Addenda shall become part of the Contract Documents and all bidders shall be bound by such Addenda. No oral comments shall be of any force or effect with respect to this solicitation.

REQUIRED DOCUMENTS AT BID TIME:

The bid shall be considered incomplete and be disqualified if any of the required BIDDING DOCUMENTS in pages BD9 to BD23 of this solicitation are not provided as instructed.

BID SECURITY: Each Bid shall be accompanied by a certified or cashier’s check or bid bond in the amount of ten (10) percent of the total Bid price payable to the City of El Centro as a guarantee that the Bidder, if its bid is accepted, will promptly execute the Agreement. A bid shall not be considered unless one of the forms of bid security is enclosed with it.

BIDS TO REMAIN OPEN: The Bidder shall guarantee the total Bid price for a period of ninety (90) Days from the date of Bid opening.

CONTRACTOR’S LICENSE CLASSIFICATION: In accordance with the provisions of California Law, OWNER has determined that CONTRACTOR shall possess a valid Class A California contractor’s license at the time that the Bid is submitted. Failure to possess the specified license shall render the Bid non-responsive and shall act as a bar to award of the Agreement to any Bidder not possessing said license at the time of Bid.

CALIFORNIA WAGE RATE REQUIREMENTS: In accordance with the provisions of California Labor Code sections 1770 et seq. as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in such sections for the locality in which the WORK is to be performed.

A copy of said wage rates is on file at the office of OWNER. It shall be mandatory for CONTRACTOR to whom the WORK is awarded, and upon any Subcontractor under CONTRACTOR, to pay not less than said specified rates to all workers employed by them in the execution of the WORK.

CONTRACTOR AND SUBCONTRACTOR REGISTRATION WITH DEPARTMENT OF INDUSTRIAL RELATIONS:

Page 470 of 758 ends

NIB 3
07/2026/cdz/A26-0136/ATPCycle6ImprovProj
Labor Code section 1771.1 provides that a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Public Contract Code section 4104, or engage in the performance of any contract for public work, as that term is defined in Chapter 1, Part 7, Division 2 of the Labor Code, unless currently registered and qualified to perform public work pursuant to Labor Code section 1725.5. Labor Code section 1771.1 also provides that it is not a violation of that section for an unregistered contractor to submit a bid that is authorized by Business and Professions Code section 7029.1 or by Public Contract Code section 10164, provided the contractor is registered to perform public work pursuant to Labor Code section 1725.5 at the time the contract is awarded.

This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

RETENTION FROM PAYMENTS: CONTRACTOR may elect to receive one hundred (100) percent of payments due under the Contract Documents from time to time, without retention of any portion of the payment by OWNER, by depositing securities of equivalent value with OWNER in accordance with the provisions of section 22300 of the Public Contract Code. Such securities, if deposited by CONTRACTOR, shall be valued by OWNER, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit or any other security mutually agreed to by CONTRACTOR and OWNER.

FILING OF BID PROTESTS: By submitting a Bid, each Bidder hereby agrees and understands that the Bidder must comply with these protest procedures and exhaust all administrative remedies set forth herein prior to the initiation of any type of related legal action. With the express written Contract of the City and Bidder, and subject to the requirements of applicable law, this protest procedure can also be used to resolve issues surrounding the City’s determination of a Bidder as not responsible. The following terms as used in this Section shall have the following meanings:
“Protest” shall mean a written objection by an interested party or affected party to (i) the requirements or specifications contained in the Notice to Bidders or any portion of documents accompanying that notice; or (ii) a proposed award recommendation protest.

A. Solicitation Phase Protest. The purpose of the solicitation is to obtain competitive Bids from Bidders. Any Bidder who has submitted a bid and who believes that a free and open competition has not taken place or that a particular specification or requirement is impractical, unduly restrictive, or ambiguous may advise the City of its concerns by submitting a detailed Solicitation Protest Statement in accordance with the requirements set forth below in this Section A. The Protest does not replace the requirement to report irregularities in the bid documents.

Page 471 of 758 ends

NIB 4
07/2026/cdz/A26-0136/ATPCycle6ImprovProj
(1) Contents and Requirements
A solicitation protest must be submitted to the contact named in the bid documents by personal delivery or email by close of business at least fifteen (15) Days prior to the Bid due date, and must contain all of the following to be considered:
a. The name, address, and telephone number of the protester; and b. The Project Name and Project Number; and
c. A detailed statement setting forth the grounds for protest, which shall include all the factual and legal documentation in support of the protest in sufficient detail to establish merits of the protest; and d. The desired resolution of the protest.

If the submitted protest does not comply with the requirements set forth herein, then it will not be considered for evaluation and will be returned to the protestor. Any grounds for protest not raised are waived. The protest may not be amended after filing. The protest is a public document.
(2) Evaluation and Determination
No hearing will be held on the protest. City’s Public Works Director, or designee, will review the protest and any supporting material and conduct an investigation of the facts. He/she may, but need not, requires other Bidders to submit statements or arguments regarding the protest and may discuss the protest with the protestor.

The Public Works Director or designee shall issue a final written decision regarding any solicitation protest to each Bidder prior to Bid opening. The written decision will cite any actions that will or will not be taken in response to the protest. That decision shall be final, and there shall be no further administrative recourse.

B. Protest of Award
(1) Contents and Requirements
Following the opening of the Bids any unsuccessful Bidder, may protest City’s proposed award of the Contract by submitting a protest to the Public Works Director or designee no later than close of business on the fifth business day. That protest must be submitted in a timely manner, signed by the protesting Bidder, must contain all of the following to be considered:
a. The name, address, and telephone number of the protestor; and b. The Project Name and Project Number; and
c. The City action or recommendation that is being protested;

Page 472 of 758 ends

NIB 5
07/2026/cdz/A26-0136/ATPCycle6ImprovProj
d. A detailed statement setting forth every ground, reason, legal authority and facts in support of the protest, including all documents and evidence including specific references to parts of the bid documents; and e. A clear statement of the relief request
A protest that does not comply with the requirements set forth herein will be returned to the protestor. The protest shall not be amended after filing. Any grounds for protest not raised are waived. The protest is a public document.

Award Protest Statements are public documents. City will notify the affected parties when a protest has been submitted, and will provide copies of the protest to the affected parties as soon as is reasonably practical. (2) Evaluation and Determination
The affected parties may file responsive statements in support of or in opposition to the protest within three (3) business days after the receipt of the protest from the City. The Public Works Director, or designee, shall review the facts and all submittals relative to the protest and shall issue a written decision setting forth the basis for such decision. The written decision will be issued to the protestor and to all affected parties.

Unless otherwise required by law, no hearing shall be provided. In the event a hearing is conducted, the Public Works Director or designee, shall issue written notice to the protestor and affected parties identifying the date and time for the hearing, along with rules concerning the hearing.

C. Delay in Award
Execution of any proposed contract shall be delayed pending the resolution of the protest unless one or more of the following conditions is present:

1. The items or services being procured are urgently required;

2. Delivery or performance will be unduly delayed by failure to make award promptly; or

3. Failure to make prompt award will otherwise cause undue harm to the City.

D. No Limitations on Remedies
Nothing contained herein shall be construed to act as a limitation of the City’s choice of remedies or confer any right upon any interested party or affected party to a remedy.

E. Basis for Choice Remedy

Page 473 of 758 ends

NIB 6
07/2026/cdz/A26-0136/ATPCycle6ImprovProj
In determining the appropriate remedy, the City shall consider all of the circumstances surrounding the notice of bids and/or award, including, but not limited to:

1. The seriousness of any deficiency found to exist in the contracting process;

2. The effect of the action on the competitive process;

3. Any urgency surrounding the requirement to enter into a contract; and

4. The effect that implementing the remedy will have on the City.

F. Remedies
If the City determines that the award or proposed award was not made in accordance with applicable statues, regulations, policies and/or procedures, the City, in its sole discretion, may grant any of the following remedies or any other remedy it deems appropriate:

1. Prior to award, City may issue a new solicitation, make a new selection/award recommendation, or award the contract consistent with applicable statutes, regulations, policies and procedures;

2. In its sole discretion, take no further action; or

3. Take any other action that is permitted by law to promote compliance.

OWNER’S RIGHTS RESERVED: OWNER reserves the right to reject any or all Bids, to waive any informality in a Bid, and to make awards to the lowest responsive Bidder as it may best serve the interest of OWNER.

Date:____________________ OWNER: City of El Centro
_________________________
Norma Wyles, City Clerk
- END OF NOTICE INVITING BIDS -

Page 474 of 758 ends

07/14\CA – Bid Template
City of El Centro
Project Name
BD-1

BIDDING DOCUMENTS

Page 475 of 758 ends

BD-2
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

INSTRUCTIONS TO BIDDERS

1. DEFINED TERMS. Terms used in these Instructions to Bidders and the Notice Inviting Bids which are defined in the General Conditions have the meanings assigned to them in the General Conditions. The term “Bidder” means one who submits a Bid directly to OWNER, as distinct from a sub-bidder, who submits a Bid to a Bidder.

2. INTERPRETATIONS AND ADDENDA.

2.1 All questions about the meaning or intent of the Contract Documents are to be directed to OWNER. Interpretations or clarifications considered necessary by OWNER in response to such questions will be issued by Addenda. Questions received less than ten (10) Days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

2.2 Addenda may also be issued to modify the Contract Documents as deemed advisable by OWNER or DESIGN CONSULTANT.

3. COMPETENCY OF BIDDERS. In selecting the lowest responsive Bidder, consideration will be given not only to the financial standing but also to the general competency of the Bidder for the performance of the WORK covered by the Bid. To this end, OWNER has determined that all Bidders must be pre-qualified. Bidders must possess a valid California contractor’s license applicable to the type of work bid upon at the time of opening Bids.

4. EL CENTRO BUSINESS LICENSE. All Bidders and their Subcontractors not already having a business license from the City of El Centro will be required to secure the appropriate license from the City of El Centro before the Agreement can be executed.

5. DISQUALIFICATION OF BIDDERS. More than one (1) Bid from an individual, firm, partnership, corporation or association under the same or different names will not be considered. If OWNER believes that any Bidder is interested in more than one (1) Bid for the WORK contemplated, all Bids in which such Bidder is interested will be rejected. If OWNER believes that collusion exists among the Bidders, all Bids will be rejected. A party who has quoted prices to a Bidder is not hereby disqualified from quoting prices to other Bidders, or from submitting a Bid directly for the WORK.

6. BIDDER’S EXAMINATION OF CONTRACT DOCUMENTS AND SITE

6.1 It is the responsibility of each Bidder before submitting a Bid:
(a) To examine thoroughly the Contract Documents and other related data identified in the Bidding Documents (including “technical data” referred to below); (b) To visit the site to become familiar with and satisfy Bidder as to the general and local conditions that may affect cost, progress or performance of the WORK; (c) To consider Federal, State and local Laws and Regulations that may affect cost, progress or performance of the WORK;

Page 476 of 758 ends

BD-3
07/2026/cdz/A26-0136/ATPCycle6ImprovProj
(d) To study and carefully correlate the Bidder’s knowledge and observations with the Contract Documents and other related data; and
(e) To notify CONSTRUCTION MANAGER of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related data.

6.2 Reference is made to the Supplementary General Conditions for identification of:
(a) Those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by DESIGN CONSULTANT in the preparation of the Contract Documents. The Bidder may rely upon the accuracy of the technical data contained in such reports, however, the interpretation of such technical data, including any interpolation or extrapolation thereof, together with non-technical data, interpretations and opinions contained therein or the completeness thereof is the responsibility of the Bidder. (b) Those drawings of physical conditions in or relating to existing surface and subsurface conditions (except Underground Utilities) which are at or contiguous to the site that have been utilized by DESIGN CONSULTANT in the preparation of the Contract Documents. The Bidder may rely upon the accuracy of the technical data contained in such drawings, however, the interpretation of such technical data, including any interpolation or extrapolation thereof, together with nontechnical data, interpretations and opinions contained in such drawings or the completeness thereof is the responsibility of the Bidder.

Subsurface conditions, including but not limited to groundwater, may have changed significantly between the completion of the soils investigation by the geotechnical engineer and start of construction. Subsurface conditions, including but not limited to groundwater, may change significantly during construction.

6.3 Copies of such reports and drawings will be made available by OWNER to any Bidder on request if said reports and drawings are not bound herein. Those reports and drawings are not part of the Contract Documents, but the technical data contained therein upon which the Bidder is entitled to rely, in Paragraph SGC-4.2 of the Supplementary General Conditions has been identified and established.

6.4 Information and data reflected in the Contract Documents with respect to Underground Utilities at or contiguous to the site is based upon information and data furnished to OWNER and DESIGN CONSULTANT by the owners of such Underground Utilities or others, and OWNER does not assume responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the Supplementary General Conditions or the section entitled “Protection and Restoration of Existing Facilities” of the General Requirements.

Page 477 of 758 ends

BD-4
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

6.5 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders on subsurface conditions, Underground Utilities and other physical conditions, and possible changes in the Contract Documents due to differing conditions appear in Paragraphs 4.2, 4.3, and 4.4 of the General Conditions.

6.6 Before submitting a Bid, each Bidder will, at Bidder’s own expense, make or obtain any additional examinations, investigations, explorations, tests and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface and Underground Utilities) at or contiguous to the site or otherwise which may affect cost, progress or performance of the WORK or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Bidder and Safety precautions and programs incident thereto which the Bidder deems necessary to determine its Bid for performing the WORK in accordance with the time, price and other terms and conditions of the Contract Documents. Interference with existing facility operations will not be permitted.

6.7 On request in advance, OWNER will provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and shall clean up and restore the site to its former condition upon completion of such examinations, investigations, explorations, tests and studies.

6.8 The lands upon which the WORK is to be performed, rights-of-way and easements for access thereto and other lands designated for use by CONTRACTOR in performing the WORK are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities or storage of materials and equipment are to be provided by CONTRACTOR. Easements for permanent structures or permanent changes in existing structures are to be obtained and paid for by OWNER unless otherwise provided in the Contract Documents.

6.9 The submission of a Bid will constitute an incontrovertible representation by the Bidder that the Bidder has complied with every requirement of this Paragraph 6, “Bidder’s Examination of Contract Documents and Site” herein, that without exception the Bid is premised upon performing the WORK required by the Contract Documents and such means, methods, techniques, sequences or procedures of construction (if any) as may be indicated in or required by the Contract Documents, that Bidder has given CONSTRUCTION MANAGER written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolution thereof by CONSTRUCTION MANAGER is acceptable to Bidder and the Contract Documents are sufficient in scope and detail to indicate and convey understanding of all terms and conditions for performance of the WORK.

Page 478 of 758 ends

BD-5
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

7. BID FORM.

7.1 The Bid shall be made on the Bid schedule bound herein and the pages may be removed from the bound volume. The envelope enclosing the sealed Bids shall be plainly marked in the upper left-hand corner with the name and address of the Bidder and shall bear the words “BID FOR” followed by “PROJECT NAME,” El Centro, CA, 92243, and the date and hour of opening of Bids. The Bid security shall be enclosed in the same envelope with the Bid.

7.2 All blanks on the Bid form must be completed in ink.

7.3 Bids by corporations must be executed in the corporate name by the president and a vice-president. Bids signed by other corporate officer or the project manager shall be (be accompanied by the enclosed certificate of authority to sign, attested by the secretary or assistant secretary, and with the corporate seal affixed. The corporate address and state of incorporation must appear below the signature.

7.4 Bids by partnerships must be executed in the partnership name and be signed by a managing partner, accompanied by evidence of authority to sign and his/her title must appear under the signature and the official address of the partnership must appear below the signature.

7.5 All names must be printed below the signature.

7.6 The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid form. Failure to acknowledge Addenda shall render the Bid non-responsive and shall be cause for its rejection.

7.7 The address to which communications regarding the Bid are to be directed must be shown.

7.8 All Bidders must provide evidence of authority to conduct business in California to the extent required by law.

Page 479 of 758 ends

BD-6
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

8. QUANTITIES OF WORK. The quantities of work or material stated in unit price items of the Schedule of Values are supplied only to give an indication of the general scope of the WORK; OWNER does not expressly or by implication agree that the actual amount of work or material will correspond therewith, and reserves the right after award to increase or decrease the amount of any unit price item of the WORK in accordance with Article 10 of the General Conditions, to delete any Bid item in its entirety, or to add additional Bid items up to and including an aggregate total amount not to exceed twenty-five (25) percent of the Contract Price.

9. SUBSTITUTE OR “OR EQUAL” ITEMS. Whenever materials or equipment are specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular supplier and the name is followed by the words “or equal,” the Bidder may write the name of a substitute supplier (which the Bidder considers as an “or equal”) in the Proposed Substitute Equipment/Material Supplier List in the Bid form. These substitute suppliers will only be considered after award of the Agreement. The procedure for the submittal of substitute or “or equal” products is specified in section 6.7 of the General Conditions.

10. SUBMISSION OF BIDS. The Bid shall be delivered by the time and to the place set forth in the Notice Inviting Bids. It is the Bidder’s sole responsibility to see that its Bid is received in proper time. It is the Bidders responsibility to point out any errors or discrepancies in the bid documents.

11. BID SECURITY, BONDS AND INSURANCE. Each Bid shall be accompanied by a certified or cashier’s check or approved Bid bond in the amount stated in the Notice Inviting Bids. Said check or bond shall be made payable to the City of El Centro and shall be given as a guarantee that the Bidder, if awarded the Agreement, will enter into an Agreement with OWNER, and will furnish the necessary insurance certificates, payment bond and performance bond; each of said Bonds to be in the amount stated in the Supplementary General Conditions. In case of refusal or failure to enter into said Agreement, the check or Bid bond, as the case may be, shall be forfeited to OWNER. If the Bidder elects to furnish a Bid bond as its Bid security, the Bidder shall use the Bid bond form bound herein, or one conforming substantially to it in form.

12. DISCREPANCIES IN BIDS. In the event of a discrepancy between words and numbers in the Bid, the words shall govern. In the event there are unit price Bid items in the Schedule of Values and the amount indicated for a unit price Bid item does not equal the product of the unit price and quantity, the unit price shall govern and the amount will be corrected accordingly, and the Bidder shall be bound by said correction. In the event there is more than one (1) Bid item in the Schedule of Values and the total indicated for the schedule does not agree with the sum of the prices bid on the individual items, the prices bid on the individual items shall govern and the total for the schedule will be corrected accordingly, and the Bidder shall be bound by said correction.

Page 480 of 758 ends

BD-7
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

13. MODIFICATIONS AND UNAUTHORIZED ALTERNATIVE BIDS. Unauthorized conditions, limitations or provisos attached to the Bid will render it informal and may cause its rejection as being non-responsive. The completed Bid forms shall be without interlineations, alterations or erasures in the printed text. Alternative Bids will not be considered unless called for. Oral, telegraphic or telephonic Bids or modifications will not be considered.

14. WITHDRAWAL OF BID. The Bid may be withdrawn by the Bidder by means of a written request, signed by the Bidder or its properly authorized representative. Such written request must be delivered to the place stipulated in the Notice Inviting Bids for receipt of Bids prior to the scheduled closing time for receipt of Bids.

15. BID RESULTS. To obtain bid results, provide a self-addressed, stamped envelope, referencing “ATP CYCLE 6 IMPROVEMENTS PROJECT ATPSB1L-5169 (065)” Bid tabulation will be mailed to you after verification of extensions. Bid results will not be given out over the telephone. Bid results may be posted on City’s website.

16. AWARD OF CONTRACT. Award of a contract, if it be awarded, will be on the basis of the Bid proposal estimated quantities and will be made to the lowest responsive Bidder whose Bid complies with all the requirements prescribed. Unless otherwise specified, any such award will be made within the period stated in the Notice Inviting Bids that the Bids are to remain open. Unless otherwise indicated, a single award will be made for all the Bid items in an individual Bid schedule. The lowest Bid shall be the lowest total of the Bid prices on the base contract.

17. RETURN OF BID SECURITY. Within fourteen (14) business days after award of the Agreement, OWNER will return the Bid securities accompanying such of the Bids as are not considered in making the award. All other Bid securities will be held until the Agreement has been finally executed. They will then be returned to the respective Bidders whose Bids they accompany.

18. EXECUTION OF AGREEMENT. The apparent low Bidder will be required to execute a written Agreement with OWNER on the form of agreement provided, shall secure all insurance and shall furnish all certificates and Bonds required by the Contract Documents within fourteen (14) calendar Days after receipt of notification that the Bidder is the apparent low Bidder. Failure or refusal to enter into an Agreement as herein provided or to conform to any of the stipulated requirements in connection therewith shall be considered non-responsive and result in the forfeiture of the Bid security. If the lowest responsive Bidder refuses or fails to execute the Agreement, OWNER may proceed to the second lowest responsive Bidder. If the second lowest responsive Bidder refuses or fails to execute the Agreement, OWNER may proceed to the third lowest responsive Bidder. On the failure or refusal of such second or third lowest Bidder to execute the Agreement, each such Bidder’s Bid securities shall be likewise forfeited to OWNER.

Page 481 of 758 ends

BD-8
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

19. LIQUIDATED DAMAGES. Provisions for liquidated damages, if any, are set forth in the Agreement.

20. WORKERS’ COMPENSATION REQUIREMENT. The Bidder should be aware that in accordance with section 3700 of the California Labor Code it will, if awarded the Agreement, be required to secure the payment of compensation to its employees and execute the Workers’ Compensation Certification in the form contained in these Contract Documents.
- END OF INSTRUCTIONS TO BIDDERS -

Page 482 of 758 ends

BD-9
07/2026/cdz/A26-0136/ATPCycle6ImprovProj
SECTION 00300A

BID FORMS
BID TO: CITY OF EL CENTRO

1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Contract Documents (as defined in Article 6 of the Agreement) to perform the WORK as specified or indicated in said Contract Documents entitled “ATP CYCLE 6 IMPROVEMENTS PROJECT ATPSB1L-5169 (065)”

2. Bidder accepts all of the terms and conditions of the Contract Documents, including without limitation those in the Notice Inviting Bids and Instructions to Bidders, dealing with the disposition of the Bid security.

3. This Bid will remain open for the period stated in the Notice Inviting Bids unless otherwise required by law. Bidder will enter into an Agreement within the time and in the manner required in the “Notice Inviting Bids” and the “Instructions to Bidders,” and will furnish the insurance certificates, Payment Bond and Performance Bond required by the Contract Documents.

4. Bidder has examined copies of all the Contract Documents including the following Addenda (receipt of all of which is hereby acknowledged):

Number ______ ______ ______ ______ ______ ______
Date ______ ______ ______ ______ ______ ______

5. Bidder has familiarized itself with the nature and extent of the Contract Documents, WORK, site, locality where WORK is to be performed, the legal requirements (Federal, State and local laws, ordinances, rules and regulations) and the conditions affecting cost, progress or performance of the WORK and has made such independent investigations as Bidder deems necessary.

To all the foregoing, and including all Bid schedule(s) and information required of Bidder contained in this Bid form, said Bidder further agrees to complete the WORK required under the Contract Documents within the Contract Time set forth in said Contract Documents, and to accept in full payment therefore the Contract Price based on the total Bid price(s) named in the aforementioned Bid schedule(s).

Dated: Bidder:

By:
(Signature)
Title:

Page 483 of 758 ends

BD-10
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

BID SCHEDULE - PRICES
Pursuant to and in compliance with the Invitation for Bids and other Contract Documents relating to the proposal for the construction of ATP CYCLE 6 IMPROVEMENTS PROJECT
ATPSB1L-5169 (065)
all in accordance with the Drawings and Project Specifications the undersigned Bidder, having familiarized himself with the terms of the Agreement, the local conditions affecting the performance of the Agreement and the cost of the WORK at the place the WORK is to be done; and with the Drawings, Project Specifications and other Contract Documents, hereby stipulated; CONTRACTOR agrees to complete the Agreement, including all of its component parts and everything required to be performed, and to provide and furnish any and all labor, materials, equipment, tools, expendable supplies, and all utility and transportation services necessary to perform the Agreement, and complete in a workmanlike manner all of the WORK required in connection with the Agreement, all in strict conformance with the Drawings and Specifications for the following prices and sum.

The following Bid Schedule of estimated quantities is included for convenience of bidding and a basis for comparison of Bids only, and CITY does not, expressly, or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the WORK, or to delete portions of the WORK, as may be deemed necessary or advisable by CITY.

All Bidders are REQUIRED to use unit prices where indicated and to complete this schedule.

All items shall be complete and in place per Plans and these Bid and Contract Documents.

Note: Payment for all work (labor, material, equipment, etc.) required for the construction and installation of the improvement as shown on the plans which is not specifically identified below in the Bid Schedule shall be considered as included in the CONTRACTOR’s price, as itemized below, for the various items of work for which the work is required, and no additional compensation shall be made therefor.

Page 484 of 758 ends

BD-11
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

PROPOSAL BID FORM

BASE BID SCHEDULE
Pursuant to and in compliance with the Notice Inviting Bids and the other documents relating thereto, the undersigned Bidder, having familiarized himself/herself with the terms of the Contract and the Contract Documents, the local conditions affecting the performance of the Contract and the cost of the work at the place where the work is to be done, hereby proposes and agrees to perform within the time stipulated, the Work of the Contract, including all of its component parts, and the furnishing of all materials and equipment required to be incorporated in the form a permanent part of the work; the furnishing of tools, equipment, supplies, transportation, utilities, facilities, labor, superintendence and services required to perform and complete the work; bonds, insurance and submittals; and including the assumption of all obligations, duties and responsibilities necessary to the successful completion of the Contract, including its acceptance by the OWNER, for the following Project:

PROJECT NAME:

ATP CYCLE 6 IMPROVEMENTS PROJECT
The total lump sum price bid shall be the total price to fully deliver a complete and in place project in accordance with the contract documents.

BID PROPOSAL SUMMARY*
TOTAL PRICE FOR BASE BID ITEMS (in figures): _________________________________ TOTAL PRICE FOR BASE BID ITEMS (in words): _________________________________ Bidder’s Initials ____________

Page 485 of 758 ends

BD-12
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

BASE BID SCHEDULE
Item
Number
Description Unit Bid
Quantity
Unit Price Total
Price
1 Mobilization/Demobilization LS 1
2 Clearing and Grubbing LS 1
3 Removal of Concrete
Sidewalk SF 7,700
4 Removal of Concrete Curb
and Gutter LF 1,689
5 Removal of Single Curb LF 451
6 Removal of Concrete
Driveway SF 2,546
7 Removal of Cross Gutter SF 1,479
8 Removal of Fence LF 212
9 Removal of Wooden Sign
Post EA 5
10 Removal of ADA Curb
Ramps SF 1,085
11 Relocate Mailbox EA 2
12 Adjust Utility Vault to
Finished Grade EA 1
13 Adjust Water Valve Cans
to Finished Grade, EC-700 EA 8
14 Adjust Manhole Frame and
Cover to Finished Grade,
EC-812
EA 1
15 Adjust Water Meter Box to
Grade EA 4
16 Under Sidewalk Drain, See
Detail on DWG G-02.02 SF 117
17 Subgrade Preparation SY 2,948
18 Class II Aggregate Base
Course TONS 2,268
19 Asphalt Concrete
Pavement TONS 848
20 Bituminous Tack Coat (SS1h) TONS 1
21 Concrete Curb and Gutter,
Type A-6, EC-200 LF 3,791
22 Concrete Cross Gutter,
EC-270 & EC-273 SF 1,531
23 6" Retaining Curb LF 33
24 Concrete Sidewalk, EC400 SF 17,765

Page 486 of 758 ends

BD
-13
07/2026/cdz/A26-0136/ATPCycle6ImprovProj
25 Concrete Driveway, EC
-
230 & EC-262 SF 765
26 Concrete Driveway, EC
-
240 Modified SF 75
27 Concrete Driveway, EC
-
250 SF 1,894
28 Typical Alley Approach,
EC-501.1 & EC-501.2 SF 1,188
29 Detectable Warning
Surface, EC-403 SF 766
30 Concrete ADA Ramp, EC
-
403-0 & EC-403-03 SF 212
31 Concrete ADA Ramp, EC-
403-0 & EC-403-03

MODIFIED
SF 51
32 Concrete ADA Ramp, EC
-
403-0 & EC-403-04 SF 136
33 Concrete ADA Ramp, EC
-
403-0 & EC-403-05 SF 2,430
34 Concrete ADA Ramp, EC
-
403-0 & EC-403-06 SF 1,955
35 Concrete ADA Ramp, EC
-
403-0 & EC-403-07 SF 192
36 Concrete ADA Ramp, EC
-
403-0 & EC-403-08 SF 314
37 Concrete ADA Ramp, EC-
403-0 & EC-403-10

MODIFIED
SF 441
38 Concrete ADA Ramp, EC
-
403-0 & EC-403-11 SF 97
39 Furnish and Install Bus
Stop Shade and Bench,
See Detail on DWG G-

02.06 LS1
40 4" Thick Decomposed
Granite Pathway CY 17
41 Relocate Fire Hydrant, EC
-
700 EA
1 42 Pavement Marking
Improvements LS
1 43 Signing Improvements LS
1 44
Furnish and Install
Rectangular Rapid
Flashing Beacons
LS1
45 Miscellaneous Work
Associated with Sidewalk,
Ramp, and Driveway
Installation (Time and
Materials Allowance)
LS1
50,000 50,000
46 Erosion Control Plan and
Implementation LS
1

Page 487 of 758 ends

BD-14
07/2026/cdz/A26-0136/ATPCycle6ImprovProj
47 Geotechnical Testing and
Monitoring LS 1
48 Construction Surveying
and Staking LS 1
49 Traffic Control Plans and
Implementation LS 1
50 Monument Preservation
project wide.

LS 1
BASE BID TOTAL (in numbers) $________________________________________________________

Page 488 of 758 ends

BD-15
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

LIST OF SUBCONTRACTORS
The Bidder shall list below the name and the location of the place of business of each Subcontractor who will perform work or labor or render service to CONTRACTOR in or about the construction of the WORK, or a Subcontractor licensed by the State who, under subcontract to CONTRACTOR, specially fabricates and installs a portion of the WORK according to detailed Drawings contained in the plans and specifications, in an amount in excess of one-half (0.5) of one (1.0) percent of CONTRACTOR’s total Bid. The Bidder shall also list below the portion of the WORK which will be done by each Subcontractor under this contract.

CONTRACTOR shall list only one (1) Subcontractor for each portion of the WORK. If Bidder does NOT intend to use ANY subcontractors, state “NONE” in the first block.

Substitutions of subcontractors listed will not be permitted unless approved by the City of El Centro.

The Bidder’s attention is directed to Paragraph 6.5.3 entitled “Subcontract Limitations” of the General Conditions which sets forth the percent of the WORK to be performed with the Bidders’ own forces. Failure to comply with this requirement will render the Bid non-responsive and may cause its rejection.

PORTION OF WORK NAME OF

SUBCONTRACTOR

CONTRACTOR LICENSE
& DIR REGISTRATION
NUMBER

PLACE OF BUSINESS
ADDRESS/TELEPHONE No.

USE ADDITIONAL FORMS AS NECESSARY

Page 489 of 758 ends

BD-16
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

GENERAL INFORMATION
BIDDER’S GENERAL INFORMATION:

The Bidder shall furnish the information requested below. Additional sheets shall be attached as required. Failure to complete Item Nos. 1 through 3 will cause the Bid to be non-responsive and shall cause its rejection. In any event, no award will be made until all of the Bidder’s general information (i.e., items 1 through 3, inclusive) is delivered to OWNER.

INFORMATION TO BE PROVIDED BY ALL BIDDERS WITH BID SUBMITTAL:
(1) CONTRACTOR’s name and address:
(2) CONTRACTOR’s telephone number: FAX number:
(3) CONTRACTOR’s license: Primary classification
California State License No. and Expiration Date
Registration No. __________________-
Supplemental classifications held, if any:

Name of Licensee, if different from (1) above:

To be considered for award, CONTRACTOR shall have met all requirements established by OWNER of the Project.
- END GENERAL INFORMATION –

Page 490 of 758 ends

BD-17
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

NONCOLLUSION DECLARATION

TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
The undersigned declares:

I am the __________________ of ______________________, the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham.

The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ____________ [date], at ______________________ [city], ________________________ [state]. - END NONCOLLUSION DECLARATION –

Page 491 of 758 ends

BD-18
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

BID BOND

KNOW ALL MEN BY THESE PRESENTS,
That _____________________________ as Principal, and ____________________as Surety, are held and firmly bound unto the City of El Centro, hereinafter called “OWNER,” in the sum of __________________________ dollars, (_______________) (not less than ten (10) percent of the total amount of the Bid) for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

WHEREAS, said Principal has submitted a Bid to said OWNER to perform the WORK required under the Bid schedule(s) of OWNER’s Contract Documents entitled:

NOW THEREFORE, if said Principal is awarded a contract by said OWNER and, within the time and in the manner required in the Notice Inviting Bids and the Instructions to Bidders enters into a written Agreement on the form of agreement bound with said Contract Documents, furnishes the required certificates of insurance and furnishes the required Performance Bond and Payment Bond, then this obligation shall be null and void, otherwise it shall remain in full force and effect. In the event suit is brought upon this Bond by said OWNER and OWNER prevails, said Surety shall pay all costs incurred by said OWNER in such suit, including reasonable attorneys’ fee to be fixed by the court and actual costs.

SIGNED AND SEALED, this day of , 20
(SEAL) (SEAL)
(Principal) (Surety)
By: By:
(Signature) (Signature)
(SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETY)
- END BID BOND –

Page 492 of 758 ends

BD-19
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

CORPORATE CERTIFICATION
OR

PARTNERSHIP INFORMATION
Name of Corporation or Partnership________________________________________________ State of Incorporation___________________________________________________________ List names and addresses of each partner, or titles, names and business addresses of President, Secretary and Treasurer.
______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ Date_____________________________ Contractor__________________________ Signature_________________________ Title________________________________ ATTEST:
__________________________________
Signature by
__________________________________
Title

END OF CORPORATE CERTIFICATION OR PARTNERSHIP INFORMATION

Page 493 of 758 ends

BD-20
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

DRUG/ALCOHOL TESTING REQUIREMENTS
CONTRACTOR shall execute the following form as required by the Federal Drug and Alcohol, Section 49 CFR Part 382.

I agree to comply with the provisions of Federal Omnibus Transportation Employee Testing Act of 1991, and that I will administer a program of alcohol and drug testing of all commercial vehicle operators, as required by Federal Regulations.

CONTRACTOR certifies compliance with the City of El Centro’s Drug and Alcohol Free Workplace Policy as a condition of the State Drug-Free Workplace Act of 1990 (Government Code sections 8350 et seq.) and the Federal Drug Free Workplace Act of 1988 (41 U.S.C.A. Sections 701 et seq.) In addition, CONTRACTOR agrees to submit a copy of its own drug free workplace policy.

Dated_____________________________
________________________________________
CONTRACTOR’s Name
_________________________________________
CONTRACTOR’s Signature
_________________________________________
Title
- END DRUG/ALCOHOL TESTING REQUIREMENTS –

Page 494 of 758 ends

BD-21
07/2026/cdz/A26-0136/ATPCycle6ImprovProj
WORKERS’ COMPENSATION CERTIFICATE
(AS REQUIRED BY SECTION 1861

OF THE CALIFORNIA LABOR CODE)
I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the WORK of this Agreement.

CONTRACTOR:

By:

Title:
- END OF WORKERS’ COMPENSATION CERTIFICATE –

Page 495 of 758 ends

BD-22
07/2026/cdz/A26-0136/ATPCycle6ImprovProj

SITE VISIT CERTIFICATE
THIS IS TO CERTIFY that:

I, ___________________________________________________(name of bidder or his representative) of the _____________________________________________________ (name of construction firm) visited the site in connection with the Bid for the ______________________________________________________________ (name of the Project.)
Having examined the bid documents, I certify that I have acquainted with the nature, geographical and exact location of the works; the general conditions of execution; the neighboring buildings and other constraints that might affect the construction methods; the obligation not to obstruct the traffic where requested, or the flow of any water; the physical conditions specific to the construction sites; the climatic conditions; local conditions; means of communication and transport; the possibility of supplying water, electricity and fuel; the availability of labor sufficient in number and quantity; all constraints and obligations resulting from social, tax and customs legislation; and all conditions and circumstances which might influence the execution or price of the works.

I further certify that I am satisfied with the description of the works and the Project Engineer’s explanations and that I understand perfectly the works to be undertaken as specified and implied in the execution of the Contract.
______________________________________________
(Name and Signature of Bidder or his Representative)
Date : ______________________
Note 1: This form shall be completed at the time of the visit to the site where the works are to be carried out. - END OF SITE VISIT CERTIFICATE –

Page 496 of 758 ends

BD-23
07/2026/cdz/A26-0136/ATPCycle6ImprovProj
CONTRACTOR’S CERTIFICATION OF QUALIFICATION

FOR LICENSE CLASSIFICATION

1. If an individual, I hereby certify that I am, or my responsible managing employee ________________________ (insert name) is, qualified for the license classification called for in these contract documents.

2. If a co-partnership or limited partnership, the general partner hereby certifies that the general partner _______________________________ (insert name), or responsible managing employee __________________________________ (insert name), is qualified for the license classification called for in these contract documents.

3. If a corporation, or any other combination or organization, the responsible managing officer _______________________________ (insert name), or a responsible managing employee ________________________________ (insert name), is qualified for the license classification called for in these contract documents.

If the individual who qualifies the Contractor for the license classification called for in these contract documents changes during the progress of the work, then Contractor shall, within seven (7) days of any such change, notify the Director of Public Works in writing of such change, including the name, license number and status of the individual.

For the purpose of this Certification, a responsible managing employee shall mean an individual who is a bona fide employee of the Contractor and is actively engaged in the classification of work for which that individual is the qualifying person on behalf of the Contractor under California law.

DATED:____________________ CONTRACTOR:___________________________________ SIGNATURE:_____________________________ TITLE:______________________________ ATTEST:

SIGNATURE BY:___________________________________________ TITLE:__________________________________________________ - END OF CONTRACTOR’S CERTIFICATION OF QUALIFICATION –
- END OF BIDDING DOCUMENTS –

Page 497 of 758 ends

CD-1
06/2026/A26-0119/BidDocs

CONTRACT DOCUMENTS

Page 498 of 758 ends

CD-2
06/2026/A26-0119/BidDocs

CITY OF EL CENTRO
ATP CYCLE 6 IMPROVEMENTS PROJECT
ATPSB1L-5169 (065)

CONSTRUCTION SERVICES AGREEMENT
This CONSTRUCTION SERVICES AGREEMENT (“Agreement”), is made and effective as of the last signature date set forth below (“Effective Date”), by and between the City of El Centro, a municipal corporation ("CITY"), and , a ("CONTRACTOR"). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows:

I. SCOPE OF WORK
A. Incorporation of Documents. This Agreement includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto for the Gillet Rd.

Rehabilitation Project LPPSB1L-5169 (064) (“Project”): Furnishing all labor, materials, equipment, and other incidental and appurtenant work necessary to complete the grinding of existing asphalt concrete pavement, installation of asphalt-rubber and aggregate membrane, installation of gap graded (GG) asphalt-rubber hot mix, installation of conventional asphalt concrete, installation of curb and gutter, utility cover adjustments, monument preservation and traffic control.

B. Scope of Work. CONTRACTOR promises and agrees, at its own cost and expense, to furnish to the CITY all labor, materials, tools, equipment, services, and incidental and customary work necessary to fully and adequately complete the Project, including all structures and facilities necessary for the Project or described in this Agreement (hereinafter the “Work” or “Project”), for a Total Contract Price as specified pursuant to this Agreement. All Work shall be subject to, and performed in accordance with the above referenced documents, as well as the Exhibits A through E attached hereto and incorporated herein by reference. The plans and specifications for the Work are further described in Exhibit A attached hereto and incorporated herein by this reference. Special conditions, if any, relating to the Work are described in Exhibit B attached hereto and incorporated herein by this reference.

C. Change in Scope of Work. Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion is approved in advance and in writing by a valid change order executed by the CITY.

II. TIME FOR PROJECT COMPLETION
CONTRACTOR shall perform and complete all Work under this Agreement within 90 calendar days, commencing within ten (10) calendar days after receiving a written Notice to Proceed from the CITY. CONTRACTOR shall perform its Work in strict accordance with any completion schedule, construction schedule or Project milestones developed by the CITY.

Page 499 of 758 ends

CD-3
06/2026/A26-0119/BidDocs
III. THE CONTRACT SUM
As consideration for the performance of the Work required herein, the CITY shall pay to CONTRACTOR the total sum of Dollars cents ($ ) (“Total Contract Price”) provided that such amount shall be subject to adjustment pursuant to the applicable terms of this Agreement or written change orders approved and signed in advance by the CITY.

IV. PROGRESS PAYMENTS
A. Application for Payment. CONTRACTOR shall submit to the CITY an itemized application for payment in the format supplied by the CITY indicating the amount of Work completed since commencement of the Work or since the last progress payment. These applications shall be supported by evidence which is required by this Agreement and such other documentation as the CITY may require. CONTRACTOR shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated. CONTRACTOR may be required to furnish a detailed schedule of values upon request of the CITY and in such detail and form as the CITY shall request, showing the quantities, unit prices, overhead, profit, and all other expenses involved in order to provide a basis for determining the amount of progress payments.

The CITY shall review and pay all progress payment requests in accordance with the provisions set forth in Article 1.7 (commencing at Section 20104.50) of Division 2, Part 3 of the Public Contract Code. No progress payments will be made for Work not completed in accordance with this Agreement.

B. Retentions. From each approved progress estimate, five percent (5%) may be deducted and retained by the CITY, and the remainder will be paid to CONTRACTOR.

All retentions shall be released and paid to CONTRACTOR and subcontractors pursuant to California Public Contract Code Section 7107.

C. Deductions. In addition to any retentions, the CITY may deduct from each progress payment an amount necessary to protect the CITY from loss because of: (1) liquidated damages which have accrued as of the date of the application for payment; (2) any sums expended by the CITY in performing any of CONTRACTOR's obligations under this Agreement which CONTRACTOR has failed to perform or has performed inadequately; (3) defective Work not remedied; (4) stop notices as allowed by state law; (5) reasonable doubt that the Work can be completed for the unpaid balance of the Total Contract Price or within the Project Completion Time; (6) unsatisfactory prosecution of the Work by CONTRACTOR; (7) unauthorized deviations from this Agreement; (8) failure of CONTRACTOR to maintain or submit on a timely basis, proper and sufficient documentation as required by this Agreement or by the CITY during the prosecution of the Work; (9) erroneous or false estimates by CONTRACTOR of the value of the Work performed; (10) any sums representing expenses, losses, or damages as determined by the CITY, incurred by the CITY for which CONTRACTOR is liable under this Agreement; and (11) any other sums which the CITY is entitled to recover CONTRACTOR under the

Page 500 of 758 ends

CD-4
06/2026/A26-0119/BidDocs
terms of this Agreement or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the CITY to deduct any of these sums from a progress payment shall not constitute a waiver of the CITY's right to such sums.

D. Payment to Subcontractors. CONTRACTOR shall pay all subcontractors for and on account of work performed by such subcontractors in accordance with the terms of their respective subcontracts and as provided for in Section 10262 of the California Public Contract Code. Such payments to subcontractors shall be based on the measurements and estimates made and progress payments provided to CONTRACTOR pursuant to this Agreement.

V. RETENTION OF SECURITIES
In accordance with California Public Contract Code Section 22300, the CITY will permit the substitution of securities for any monies withheld by the CITY to ensure performance under this Agreement at the request and expense of CONTRACTOR. At the request and expense of CONTRACTOR, securities equivalent to the amount withheld shall be deposited with the CITY, or with a state or federally chartered bank in California as the escrow agent, and thereafter the CITY shall then pay such monies to CONTRACTOR a they come due. Upon satisfactory completion of this Agreement, the securities shall be returned to CONTRACTOR. For purposes of this Section and Section 22300 of the Public Contract Code, the term “satisfactory completion of the contract” shall mean the time the CITY has issued written final acceptance of the Work and filed a Notice of Completion as required by law and provisions of this Agreement. CONTRACTOR shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. The escrow agreement used for the purposes of this Section shall be in the form provided by the CITY.

VI. TITLE TO WORK
As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the CITY at the time of payment. To the extent that title has not previously been vested in the CITY by reason of payments, full title shall pass to the CITY at delivery of the Work at the destination and time specified in this Agreement. Such transferred title shall in each case be good, and free and clear from any and all security interests, liens, or other encumbrances. CONTRACTOR promises and agrees that it will not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interests, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the CITY, nor relieve CONTRACTOR from the responsibility to strictly comply with this Agreement, and shall not relieve CONTRACTOR of responsibility for any loss or damage to items.

VII. DISPUTE RESOLUTION
Any separate demand by CONTRACTOR for the payment of money or damages shall be resolved in accordance with Public Contract Code Sections 20104, et seq., if applicable.

Page 501 of 758 ends

CD-5
06/2026/A26-0119/BidDocs
VIII. TERMINATION
This Agreement may be terminated by the CITY at any time by giving CONTRACTOR three (3) days advance written notice. In the event of termination by the CITY for any reason other than the fault of CONTRACTOR, the CITY shall pay CONTRACTOR for all Work performed up to that time as provided herein. In the event of breach of this Agreement by CONTRACTOR, the CITY may terminate this Agreement immediately without notice, may reduce payment to CONTRACTOR in the amount necessary to offset the CITY’s resulting damages, and may pursue any other available recourse against CONTRACTOR. CONTRACTOR may not terminate this Agreement except for cause.

In the event this Agreement is terminated in whole or in part as provided, the CITY may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. Further, if this Agreement is terminated as provided, the CITY may require CONTRACTOR to provide all finished or unfinished documents, data, diagrams, drawings, materials or other matter prepared or built by CONTRACTOR in connection with its performance of this Agreement.

IX. COMPLETION OF WORK
When CONTRACTOR determines that it has completed the Work required herein, CONTRACTOR shall so notify the CITY in writing and shall furnish all labor and material releases required by this Agreement. The CITY shall thereupon inspect the Work. If the Work is not acceptable to the CITY, the CITY shall indicate to CONTRACTOR in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once CONTRACTOR determines that it has completed the incomplete or unsatisfactory Work, CONTRACTOR may request a re-inspection by the CITY. Once the Work is acceptable to CITY, CITY shall pay to CONTRACTOR the Total Contract Price remaining to be paid, less any amount which the CITY may be authorized or directed by law to retain. Payment of retention proceeds due to CONTRACTOR shall be made in accordance with Section 7107 of the California Public Contract Code.

X. CITY’S REPRESENTATIVE
The CITY hereby designates the Public Works Director/City Engineer, or his designee, to act as his representative for the performance of this Agreement (“City’s Representative”). City’s Representative shall have the power to act on behalf of the CITY for all purposes under this Agreement. CONTRACTOR shall not accept direction or orders from any person other than the City’s Representative or his designee.

XI. CONTRACTOR’S REPRESENTATIVE
Before starting the Work, CONTRACTOR shall submit in writing the name, qualifications and experience of its proposed representative who shall be subject to the review and approval of the CITY (“Contractor’s Representative”). Following approval by the CITY, the Contractor’s Representative shall have full authority to represent and act on behalf of CONTRACTOR for all purposes under this Agreement. The Contractor’s Representative

Page 502 of 758 ends

CD-6
06/2026/A26-0119/BidDocs
shall supervise and direct the Work, using his or her best skill and attention, and shall be responsible for all construction means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portion of the Work under this Agreement.

Contractor’s Representative shall devote full time to the Project and either his or her designee, who shall be acceptable to the CITY, shall be present at the Work site at all times that any Work is in progress and at any time that any employee or subcontractor of CONTRACTOR is present at the Work site. Arrangements for responsible supervision, acceptable to the CITY, shall be made for emergency Work which may be required. Should CONTRACTOR desire to change its Contractor’s Representative, CONTRACTOR shall provide the information specified above and obtain the CITY’s written approval.

XII. CONTRACT INTERPRETATION
Should any question arise regarding the meaning or import of any of the provisions of this Agreement or written change orders approved and signed by the CITY, the matter shall be referred to City’s Representative, whose decision shall be binding upon CONTRACTOR.

XIII. LOSS AND DAMAGE
CONTRACTOR shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the performance of the Work until the same is fully completed and accepted by the CITY. CONTRACTOR shall be responsible for damage proximately caused by “Acts of God,” within the meaning of Section 7105 of the Public Contract Code, only to the extent of five percent (5%) of the Total Contract Price as specified herein. In the event of damage proximately caused by “Acts of God,” the CITY may terminate this Agreement upon three (3) days advanced written notice.

XIV. INDEMNITY, DEFENSE AND HOLD HARMLESS AGREEMENT
CONTRACTOR shall defend with legal counsel approved by the CITY, indemnify and hold the CITY, its officers, officials, employees, volunteers and agents free and harmless from and against any and all claims, demands, causes of action, liability, loss, damage, injury, expense, or cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation), in law or equity, to property or persons, including wrongful death, of every nature arising out of or incident to any alleged acts, omissions, or willful misconduct of CONTRACTOR, its officials, officers, employees, agents, consultants, and subcontractors arising out of or in connection with the performance of the Work, the Project, or this Agreement, including CONTRACTOR’s failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the CITY. Should conflict of interest principles preclude a single legal counsel from representing both the CITY and CONTRACTOR, or should the CITY otherwise find CONTRACTOR’s legal counsel unacceptable, then CONTRACTOR shall reimburse the CITY its costs of defense, including without limitation reasonable attorney fees, expert fees and all other costs and fees of litigation. CONTRACTOR shall pay and satisfy any judgment, award or decree that

Page 503 of 758 ends

CD-7
06/2026/A26-0119/BidDocs
may be rendered against the CITY or its officers, officials, employees, volunteers or agents, in any such suit, action or other legal proceeding. CONTRACTOR shall reimburse the CITY and its officers, officials, officers, employees, volunteers and/or agents, for any and all legal expenses and costs incurred by each of them in connection therewith or in enforcing the indemnity herein provided. CONTRACTOR’s obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the CITY, its officers, officials, employees, volunteers, or agents. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.

CONTRACTOR agrees to obtain executed indemnity agreements with provisions identical to those set forth here in this Section from each and every subcontractor or any other person or entity involved by, for, with or on behalf of CONTRACTOR in the performance of this Agreement. In the event CONTRACTOR fails to obtain such indemnity obligations from others are required here, CONTRACTOR agrees to be fully responsible according to the terms of this Section. Failure of the CITY to monitor compliance with these requirements imposes no additional obligations on the CITY and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend the CITY as set forth here is binding on the successors, assigns or heirs of CONTRACTOR and shall survive the termination of this Agreement or this Section.

XV. PREVAILING WAGES
CONTRACTOR is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 1600, et seq., ("Prevailing Wage Laws"), the Davis-Bacon Act of 1931 and 23 USC 113, which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. CONTRACTOR agrees to fully comply with such Prevailing Wage Laws.

Wage rates shall conform with those available at www.dir.ca.gov/OPRL/Pwd for Imperial County.

XVI. APPRENTICED OCCUPATIONS
When CONTRACTOR employs workmen in an apprenticed craft or trade, CONTRACTOR shall comply with the provisions of Section 1777.5 of the Labor Code with respect to the employment of properly registered apprentices upon public works. The primary responsibility for compliance with said section for all apprenticed occupations shall be with CONTRACTOR.

XVII. HOURS OF WORK
CONTRACTOR is advised that eight (8) hours labor constitutes a legal day's work.

Pursuant to Section 1813 of the Labor Code, CONTRACTOR shall forfeit a penalty of $25.00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker.

Page 504 of 758 ends

CD-8
06/2026/A26-0119/BidDocs
XVIII. PAYROLL RECORDS
In accordance with the requirements of Labor Code Section 1776, CONTRACTOR shall keep accurate payroll records which are either on forms provided by the Division of Labor Standards Enforcement or which contain the same information required by such forms.

Responsibility for compliance with Labor Code Section 1776 shall rest solely with CONTRACTOR, and CONTRACTOR shall make all such records available for inspection at all reasonable hours.

XIX. LABOR AND MATERIAL RELEASES
CONTRACTOR shall furnish the CITY with labor and material releases from all subcontractors performing the Work or furnishing materials for the Work governed by this Agreement prior to final payment by the CITY.

XX. EQUAL OPPORTUNITY EMPLOYMENT
CONTRACTOR represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the state or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

XXI. RECORD AUDIT
In accordance with Government Code, Section 8546.7, records of both the CITY and CONTRACTOR shall be subject to examination and audit by the Auditor General for a period of three (3) years after final payment.

XXII. CLAIM PROCEDURES UNDER PUBLIC CONTRACT CODE SECTION 9204 CONTRACTOR shall comply with the procedure set forth in Public Contract Code Section 9204 for any claim, as that term is defined therein, for one or more of the following: 1) a time extension, including, without limitation, for relief from damages or penalties for delay, 2) payment of money or damages arising from work done pursuant to this Agreement, and/or 3) payment of an amount disputed by the CITY under this Agreement.

The provisions of Public Contract Code Section 9204 are included and incorporated into this Agreement.

XXIII. CERTIFICATIONS
CONTRACTOR shall have a Class A License from the Contractors State License Board of the State of California. By its signature hereunder, CONTRACTOR certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake selfinsurance in accordance with the provisions of that Code, and agrees to comply with such

Page 505 of 758 ends

CD-9
06/2026/A26-0119/BidDocs
provisions before commencing the performance of the Work. A certification form for this purpose, which is attached to this Agreement as Exhibit C and incorporated herein by reference, shall be executed simultaneously with this Agreement.

XXIV. BONDS
A. Performance Bond. If specifically requested by the CITY, Contractor shall execute and provide to City concurrently with this Agreement a Performance Bond in the amount of the Total Contract Price indicated in this Agreement, and in a form provided or approved by the CITY. If such bond is required, no payment will be made to CONTRACTOR until it has been received and approved by the CITY.

B. Payment Bond. If required by law or otherwise specifically requested by the CITY, CONTRACTOR shall execute and provide to the CITY concurrently with this Agreement a Payment Bond in the amount of the Total Contract Price indicated in this Agreement, and in a form provided or approved by the CITY. If such bond is required, no payment will be made to CONTRACTOR until it has been received and approved by the CITY.

C. Bond Provisions. Should, in CITY's sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, CONTRACTOR shall renew or replace the affected bond within 10 days of receiving notice from the CITY. In the event the surety or CONTRACTOR intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the CITY, and CONTRACTOR shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Agreement until any replacement bonds required by this Section are accepted by the CITY. To the extent, if any, that the total compensation is increased in accordance with this Agreement, CONTRACTOR shall, upon request of the CITY, cause the amount of the bonds to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the CITY. To the extent available, the bonds shall further provide that no change or alteration of this Agreement (including, without limitation, an increase in the total compensation, as referred to above), extensions of time, or modifications of the time, terms, or conditions of payment to CONTRACTOR, will release the surety. If CONTRACTOR fails to furnish any required bond, the CITY may terminate this Agreement for cause.

D. Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, shall be accepted. The surety must be a California-admitted surety with a current A.M. Best’s rating no less than A:VIII and satisfactory to the CITY. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the CITY.

XXV. FINAL PAYMENT AND ANTI-TRUST CLAIMS
Final payment, constituting the entire unpaid balance of the Total Contract Price, shall be paid by the CITY to CONTRACTOR no sooner than thirty-five (35) days after a Notice of

Page 506 of 758 ends

CD-10
06/2026/A26-0119/BidDocs
Completion has been recorded, unless otherwise stipulated in the Notice of Completion, provided the Work has then been completed, this Agreement fully performed, and (if applicable) a final Certificate for Payment has been issued by the Architect.

In the event California Public Contract Code Section 7103.5 applies to this Agreement, in entering into this Agreement to supply goods, services or materials, CONTRACTOR hereby offers and agrees to assign to the CITY all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to this Agreement. This assignment shall be made and become effective at the time the CITY tender final payment to CONTRACTOR, without further acknowledgment by the parties.

XXVI. CONTRACTOR'S FAILURE TO PROCURE COMPLETION OF PROJECT In the event CONTRACTOR fails to furnish tools, equipment, or labor in the necessary quantity or quality, or fails to perform the Work or any part thereof contemplated by this Agreement in a diligent and workmanlike manner, and if the CONTRACTOR for a period of three (3) calendar days after receipt of written demand from the CITY or City’s Representative to do so, fails to furnish tools, equipment, or labor in the necessary quantity or quality, and to perform its Work and all parts thereof in a diligent and workmanlike manner, or after commencing to do so within said three (3) calendar days, fails to continue to do so; then the CITY may exclude CONTRACTOR from the premises, or any portion thereof, and take possession of said premises or any portion thereof, together with all material and equipment thereon, and may complete the Work contemplated by this Agreement or any portion of said Work, either by furnishing the tools, equipment, labor or material necessary, or by letting the unfinished portion of the Work, or the portion taken over by the CITY to another contractor or by a combination of such methods. In any event, the procuring of the completion of said Work, or the portion thereof taken over by the CITY, shall be a charge against CONTRACTOR, and may be deducted from any money due or becoming due to CONTRACTOR from the CITY, or CONTRACTOR shall pay the CITY the amount of said charge, or the portion thereof unsatisfied. The sureties provided for under this Agreement shall become liable for payment should CONTRACTOR fail to pay in full any said cost incurred by the CITY.

XXVII. WARRANTY
CONTRACTOR warrants all Work under this Agreement (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the Work) to be of good quality and free from any defective or faulty material and workmanship. CONTRACTOR agrees that for a period of one year (or the period of time specified elsewhere in this Agreement or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) after the date of final acceptance, CONTRACTOR shall within ten (10) days after being notified in writing by the CITY of any defect in the Work or non-conformance of the Work to this Agreement, commence and

Page 507 of 758 ends

CD-11
06/2026/A26-0119/BidDocs
prosecute with due diligence all Work necessary to fulfill the terms of the warranty at his sole cost and expense. CONTRACTOR shall act sooner as requested by the CITY in response to an emergency. In addition, CONTRACTOR shall, at its sole cost and expense, repair and replace any portions of the Work (or work of other contractors) damaged by its defective Work or which becomes damaged in the course of repairing or replacing defective Work. For any Work so corrected, CONTRACTOR's obligation hereunder to correct defective Work shall be reinstated for an additional one year period, commencing with the date of acceptance of such corrected Work. CONTRACTOR shall perform such tests as the CITY may require verifying that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of this Agreement. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of CONTRACTOR. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Work, whether express or implied, are deemed to be obtained by CONTRACTOR for the benefit of the CITY, regardless of whether or not such warranties and guarantees have been transferred or assigned to the CITY by separate agreement and CONTRACTOR agrees to enforce such warranties and guarantees, if necessary, on behalf of the CITY. In the event that CONTRACTOR fails to perform its obligations under this Section, or under any other warranty or guaranty under this Agreement, to the reasonable satisfaction of the CITY, the CITY shall have the right to correct and replace any defective or non-conforming Work and any work damaged by such work or the replacement or correction thereof at CONTRACTOR's sole expense. CONTRACTOR shall be obligated to fully reimburse the CITY for any expenses incurred hereunder upon demand.

XXVIII. LAWS AND REGULATIONS
CONTRACTOR shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of this Agreement or the Work, including all Cal/OSHA requirements, and shall give all notices required by law. CONTRACTOR shall be liable for all violations of such laws and regulations in connection with Work. If CONTRACTOR observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the CITY in writing. Any necessary changes shall be made by written change order. If CONTRACTOR performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the CITY, CONTRACTOR shall be solely responsible for all costs arising there from. CONTRACTOR shall defend, indemnify and hold the CITY, its officials, directors, officers, employees and agents free and harmless, pursuant to the indemnification provisions of this Agreement, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

XXIX. INSURANCE
Prior to the beginning of and throughout the duration of the Work, CONTRACTOR and its subcontractors shall maintain insurance in conformance with the requirements set forth below. CONTRACTOR will use existing coverage to comply with these requirements. If

Page 508 of 758 ends

CD-12
06/2026/A26-0119/BidDocs
that existing coverage does not meet the requirements set forth herein, CONTRACTOR agrees to amend, supplement or endorse the existing coverage to do so.

CONTRACTOR acknowledges that the insurance coverage and policy limits set forth in this Section constitute the minimum amount of coverage required. Any insurance proceeds available to CONTRACTOR or its subcontractors in excess of the limits and coverage required by this Agreement and which is applicable to a given loss, claim or demand, will be equally available to the CITY.

Without limiting CONTRACTOR’s indemnification of the CITY, and prior to commencement of the Work, CONTRACTOR shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to the CITY. CONTRACTOR shall provide the following types and amounts of insurance:

A. General liability insurance. CONTRACTOR shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $1,000,000 per occurrence, $2,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.

B. Automobile liability insurance. CONTRACTOR shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the CONTRACTOR arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.

C. Umbrella or excess liability insurance. CONTRACTOR shall obtain and maintain an umbrella or excess liability insurance that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability and employer’s liability. Such policy or policies shall include the following terms and conditions:
• A drop down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason;
• Pay on behalf of wording as opposed to reimbursement; • Concurrency of effective dates with primary policies; • Policies shall “follow form” to the underlying primary policies; and • Insureds under primary policies shall also be insureds under the umbrella or excess policies.

D. Workers’ compensation insurance. CONTRACTOR shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with

Page 509 of 758 ends

CD-13
06/2026/A26-0119/BidDocs
limits of at least $1,000,000) for CONTRACTOR’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, CONTRACTOR shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees.

CONTRACTOR shall submit to the CITY, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of the CITY, its officers, agents, employees and volunteers.

E. Pollution liability insurance. Environmental Impairment Liability Insurance shall be written on CONTRACTOR’s Pollution Liability form or other form acceptable to the CITY providing coverage for liability arising out of sudden, accidental and gradual pollution and remediation. The policy limit shall be no less than $1,000,000 dollars per claim and in the aggregate. All activities contemplated in this Agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for the hauling of waste from the Project site to the final disposal location, including non-owned disposal sites.

Products/completed operations coverage shall extend a minimum of three (3) years after Project completion. Coverage shall be included on behalf of the insured for covered claims arising out of the actions of independent contractors. If the insured is using subcontractors, the Policy must include work performed “by or on behalf” of the insured. Policy shall contain no language that would invalidate or remove the insurer’s duty to defend or indemnify for claims or suits expressly excluded from coverage. The policy shall specifically provide for a duty to defend on the part of the insurer. The CITY, its officials, officers, agents, and employees, shall be included as insureds under the policy.

F. Builder’s risk insurance. Upon commencement of construction and with approval of CITY, CONTRACTOR shall obtain and maintain builder’s risk insurance for the entire duration of the Project until only the CITY has an insurable interest. The Builder’s Risk coverage shall include the coverages as specified below.

The named insureds shall be CONTRACTOR and the CITY, including its officers, officials, employees, and agents. All Subcontractors (excluding those solely responsible for design Work) of any tier and suppliers shall be included as additional insureds as their interests may appear. CONTRACTOR shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to the CITY. The policy shall contain a provision that all proceeds from the builder’s risk policy shall be made payable to the CITY. The CITY will act as a fiduciary for all other interests in the Project.

Policy shall be provided for replacement value on an "all risk" basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, nonconforming Work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials,

Page 510 of 758 ends

CD-14
06/2026/A26-0119/BidDocs
facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Project site or any staging area. Such insurance shall be on a form acceptable to the CITY to ensure adequacy of terms and sub limits and shall be submitted to the CITY prior to commencement of the Work.

G. Other provisions or requirements
(1) Proof of insurance. CONTRACTOR shall provide certificates of insurance to the CITY as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by the CITY’s risk manager prior to commencement of performance. Current certification of insurance shall be kept on file with the CITY at all times during the term of this Agreement. The CITY reserves the right to require complete, certified copies of all required insurance policies, at any time. (2) Duration of coverage. CONTRACTOR shall procure and maintain for the duration of this Agreement insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by CONTRACTOR, his agents, representatives, employees or subcontractors.

CONTRACTOR must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. The CITY and its officers, officials, employees, and agents shall continue as additional insureds under such policies.
(3) Primary/noncontributing. Coverage provided by CONTRACTOR shall be primary and any insurance or self-insurance procured or maintained by the CITY shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of the CITY before the CITY’s own insurance or self-insurance shall be called upon to protect it as a named insured.
(4) City’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these requirements or is canceled and not replaced, the CITY has the right but not the duty to obtain the insurance it deems necessary and any premium paid by the CITY will be promptly reimbursed by CONTRACTOR or the CITY will withhold amounts sufficient to pay premium from CONTRACTOR payments. In the alternative, the CITY may immediately terminate this Agreement. (5) Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of

Page 511 of 758 ends

CD-15
06/2026/A26-0119/BidDocs
insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the CITY’s risk manager.
(6) Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against the CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow CONTRACTOR or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. CONTRACTOR hereby waives its own right of recovery against the CITY, and shall require similar written express waivers and insurance clauses from each of its sub-consultants/subcontractors. (7) Enforcement of contract provisions (non estoppel). CONTRACTOR acknowledges and agrees that any actual or alleged failure on the part of the CITY to inform CONTRACTOR of non-compliance with any requirement imposes no additional obligations on the CITY nor does it waive any rights hereunder. (8) Requirements not limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If CONTRACTOR maintains higher limits than the minimums shown above, the CITY requires and shall be entitled to coverage for the higher limits maintained by CONTRACTOR. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the CITY. (9) Notice of cancellation. CONTRACTOR agrees to oblige its insurance agent or broker and insurers to provide to the CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.
(10) Additional insured status. General liability policies shall provide or be endorsed to provide that the CITY and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies.
(11) Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to the CITY and approved of in writing.
(12) Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that CONTRACTOR’s insurance shall apply separately to each insured against who claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.

Page 512 of 758 ends

CD-16
06/2026/A26-0119/BidDocs
(13) Pass through clause. CONTRACTOR agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project that is brought onto or involved in the project by CONTRACTOR, provide the same minimum insurance coverage and endorsements required of CONTRACTOR. CONTRACTOR agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this Section. CONTRACTOR agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the Project will be submitted to the CITY for review. (14) City’s right to revise requirements. The CITY reserves the right at any time during the term of this Agreement to change the amounts and types of insurance required by giving CONTRACTOR a ninety (90) day advance written notice of such change. If such change results in substantial additional cost to CONTRACTOR, the CITY and CONTRACTOR may renegotiate CONTRACTOR’s compensation. (15) Self-insured retentions. Any self-insured retentions must be declared to and approved by the CITY. The CITY reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the CITY. (16) Timely notice of claims. CONTRACTOR shall give the CITY prompt and timely notice of claims made or suits instituted that arise out of or result from CONTRACTOR’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
(17) Additional insurance. CONTRACTOR shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.

XXX. CONTRACTOR'S LICENSE; CITY BUSINESS LICENSE
CONTRACTOR shall be responsible for securing, at its own expense, and paying for all permits and licenses necessary to perform the Work described herein. CONTRACTOR must possess at the time of commencing work and throughout the Project duration, a Contractor's License, issued by the State of California, which is current and in good standing. CONTRACTOR shall ensure that any subcontractor working on the Project possesses at the time of commencing work and throughout the Project duration, a Contractor's License, issued by the State of California, which is current and in good standing.

CONTRACTOR shall have a current City business license at the time of commencement of work on the project.

XXXI. REGISTRATION REQUIREMENTS
Pursuant to Section 1771.1(a) of the Labor Code:

Page 513 of 758 ends

CD-17
06/2026/A26-0119/BidDocs
“A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.” CONTRACTOR must be registered with the Department of Industrial Relations (DIR) of the State of California in order to be eligible to work on public works projects.

CONTRACTOR must ensure registration with the DIR that is active and in good standing.

No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.

This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

CONTRACTOR is not subject to public works requirements (including registration with the DIR) if the public works project is under $1,000, unless the CITY knows that CONTRACTOR will be awarded total project costs in excess of $1,000 for a given year.

XXXII. CORPORATION IN GOOD STANDING
If CONTRACTOR is a corporation, the undersigned hereby represents and warrants that the corporation is duly incorporated and in good standing in the State of California, and that , whose title is , is authorized to act for and bind the corporation.

XXXIII. PROVISIONS REQUIRED BY LAW
Each and every provision of law and clause required by law to be inserted in this Agreement shall be deemed to be inserted herein and the Agreement shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not currently inserted, then upon application of either party the Agreement shall forthwith be physically amended to make such insertion or correction.

CONTRACTOR shall provide Faithful Performance and Labor and Materials bonds in the forms attached as Exhibit D and E, respectively, and incorporated herein by reference, and as acceptable to the CITY.

Page 514 of 758 ends

CD-18
06/2026/A26-0119/BidDocs
XXXIV. SUBSURFACE HAZARDOUS MATERIALS
A. In the event trenches or other excavations extend deeper than four (4) feet below the surface, CONTRACTOR shall promptly, and before the following conditions are disturbed, notify the CITY in writing of any:

1. Material that CONTRACTOR believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code that is required to be removed to a Class I, Class II or Class III disposal site in accordance with the provisions of existing law.

2. Subsurface or latent physical conditions at the site differing from those indicated.

3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in the Work or the character provided for in this Agreement.

B. Upon receipt of said notification the CITY will investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in CONTRACTOR's cost of or the time required for performance of any part of the Work, the CITY will issue a change order as set forth herein.

C. In the event that a dispute arises between the CITY and CONTRACTOR whether the conditions materially differ, or involve hazardous waste or cause a decrease or increase in CONTRACTOR's cost of or time required for performance of any part of the Work, CONTRACTOR shall not be excused from any scheduled completion date provided for by this Agreement, but shall proceed with all Work to be performed under this Agreement. CONTRACTOR shall retain any and all rights provided either by this Agreement or by law which pertain to the resolution of disputes and protests between the contracting parties.

XXXV. LIQUIDATED DAMAGES
Pursuant to Government Code Section 53069.85, if the Work is not completed within the Project Completion Time or in strict accordance with any completion schedule, construction schedule or Project milestones developed by the CITY, it is understood, acknowledged and agreed that the CITY will suffer damage. It is therefore agreed that CONTRACTOR shall pay to the CITY the sum of one thousand five hundred dollars ($1,500) for each and every calendar day of delay beyond the Project Completion Time, or beyond any completion schedule, construction schedule or Project milestones developed by the CITY, or beyond the time indicated in the completion schedule, construction schedule or Project milestones developed by the CITY for any individual task or activity.

CONTRACTOR expressly understands, acknowledges and agrees that such liquidated damages can and shall be imposed if CONTRACTOR does not meet each and every aspect of any completion schedule, construction schedule or Project milestones developed by the CITY. If the CITY accepts Work or makes any payment under this Agreement after a

Page 515 of 758 ends

CD-19
06/2026/A26-0119/BidDocs
default by reason of delays, the acceptance of such Work and/or payment(s) shall in no respect constitute a waiver or modification of any provisions regarding Project Completion Time, a completion schedule, completion schedule, construction schedule or Project milestones developed by the CITY or the accrual of liquidated damages. In the event the same is not paid, CONTRACTOR further agrees that the CITY may deduct the amount thereof from any money due or that may become due to CONTRACTOR under this Agreement. This Article does not exclude recovery of any other damages and is expressly in addition to the CITY’s ability to seek other damages.

XXXVI. NOTICES
All notices hereunder and communications regarding interpretation of the terms of this Agreement or changes thereto shall be provided by the mailing thereof by registered or certified mail, return receipt requested, postage prepaid and addressed as follows:

CITY CONTRACTOR
City of El Centro ____________________________
Public Works Department ____________________________
307 W. Brighton Ave. ____________________________
El Centro, CA 92243 ____________________________
Attn: Abraham Campos, Public Works Director Attn:________________________ Any notice so given shall be considered received by the other party three (3) days after deposit in the U.S. Mail as stated above and addressed to the party at the above address. Actual notice shall be deemed adequate notice on the date actual notice occurred, regardless of the method of service.

XXXVII. ENTIRE CONTRACT
This Agreement constitutes the entire contract of the parties. No other agreements or contracts, whether oral or written, pertaining to the Work to be performed, exist between the parties. This Agreement can be modified only by an amendment in writing, signed by both parties.

XXXVIII. GOVERNING LAW
This Agreement shall be governed by the laws of the State of California.

XXXIX. COUNTERPARTS
This Contract may be executed in counterparts, each of which shall constitute an original. [Signatures on Following Page]

Page 516 of 758 ends

CD-20
06/2026/A26-0119/BidDocs
IN WITNESS WHEREOF, each of the parties has caused this Agreement to be executed on the Effective Date.

CONTRACTOR CITY
_______________________ City of El Centro
a ______________________ a California municipal corporation By: ____________________________ By: ____________________________ Title: __________________________ Title: __________________________ Date: __________________________ Date: __________________________ ATTEST:

By _____________________________
Norma Wyles, City Clerk
ATTACHMENTS:

Exhibit A Plans and Specifications
Exhibit B Special Provisions
Exhibit C Contractor’s Certification Form
Exhibit D Faithful Performance Bond
Exhibit E Labor and Materials Bond

Page 517 of 758 ends

CD-21
06/2026/A26-0119/BidDocs

EXHIBIT A

PLANS AND SPECIFICATIONS

Page 518 of 758 ends

CD-22
06/2026/A26-0119/BidDocs

EXHIBIT B

SPECIAL PROVISIONS

Page 519 of 758 ends

CD-23
06/2026/A26-0119/BidDocs

EXHIBIT C
CONTRACTOR’S CERTIFICATION FORM
I, the undersigned Contractor, am aware of the provisions of Section 3700 et seq. of the Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of the Code, and I, the undersigned Contractor, agree to and will comply with such provisions before commencing the performance of the Work on this Contract.
[INSERT CONTRACTOR'S NAME]
By: ____________________________
[INSERT NAME]
[INSERT TITLE]

Page 520 of 758 ends

CD-24
06/2026/A26-0119/BidDocs

EXHIBIT D

FAITHFUL PERFORMANCE BOND
Whereas, The City Council of the City of El Centro, State of California, and _(hereinafter designated as “principal”) have entered into an agreement whereby principal agrees to install and complete certain designated public improvements, which said agreement, dated __________, 20__, and identified as project , is hereby referred to and made a part hereof; and Whereas, Said principal is required under the terms of said agreement to furnish a bond for the faithful performance of said agreement.

Now, therefore, we, the principal and , as surety, are held and firmly bound unto the City of El Centro (hereinafter designated as “El Centro”) in the penal sum of dollars ($ ) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.

The condition of this obligation is such that if the above-bounded principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the said agreement and any alteration thereof made as therein provided, on his or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless El Centro, its officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney’s fees, incurred by El Centro in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the specifications accompanying the same shall in anywise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.

In Witness Whereof, this instrument has been duly executed by the principal and surety above named, on ______________________, 20__.
(SEAL) (SEAL)
(CONTRACTOR) (Surety)
By: By:

Page 521 of 758 ends

CD-25
06/2026/A26-0119/BidDocs
(Signature) (Signature)
- END OF PERFORMANCE BOND –

Page 522 of 758 ends

CD-26
06/2026/A26-0119/BidDocs

EXHIBIT E

LABOR AND MATERIALS BOND
Whereas, the City Council of the City of El Centro, State of California, and (hereinafter designated as ''the Principal") have entered into an Agreement dated __________, 20__, and described as _whereby the Principal agrees to install and complete certain designated public improvements identified as _which are part of City project , and which Agreement is hereby referred to and made a part hereof; and Whereas, under the terms of the Agreement, the Principal is required before entering upon the performance of the work to file a good and sufficient payment bond with the City of El Centro to secure the claims referenced in Civil Code Sections 9550 et seq.; and Now, therefore, the Principal and the undersigned as corporate surety, are held firmly bound unto the City of El Centro and all contractors, subcontractors, laborers, materialmen, and other persons employed in the performance of the Agreement and referenced in Sections 9550 et seq of the Civil Code in the sum of _dollars ($ ), for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to this work or labor, that the surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by the City of El Centro in successfully enforcing this obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Section 9550 et seq of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration. or addition to
the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension, alteration, or addition.

In witness whereof, this instrument has been duly executed by the principal and surety above named, on________________, 20___. _______________________________ ____________________
(CONTRACTOR) (Surety)
By:__________________________ By:_______________________________ (Signature) (Signature)

Page 523 of 758 ends

CD-27
06/2026/A26-0119/BidDocs
-END OF PAYMENT BONDPage 524 of 758
CD-28
06/2026/A26-0119/BidDocs
Public Contract Code Section 22300

(a) For purposes of this section, “contractor” includes, but is not limited to, a contractor performing a public works contract, as defined in Section 1101, and any person or entity that would qualify as a contractor under Section 6106.5.
(b) Provisions shall be included in any invitation for bid and in any contract documents to permit the substitution of securities for any moneys withheld by a public agency to ensure performance under a contract; however, substitution of securities provisions shall not be required in contracts in which there will be financing provided by the Farmers Home Administration of the United States Department of Agriculture pursuant to the Consolidated Farm and Rural Development Act (7 U.S.C. Sec. 1921 et seq.), and where federal regulations or policies, or both, do not allow the substitution of securities. At the request and expense of the contractor, securities equivalent to the amount withheld shall be deposited with the public agency, or with a state or federally chartered bank in this state as the escrow agent, who shall then pay those moneys to the contractor. Upon satisfactory completion of the contract, the securities shall be returned to the contractor.
(c) Alternatively, the contractor may request and the owner shall make payment of retentions earned directly to the escrow agent at the expense of the contractor. At the expense of the contractor, the contractor may direct the investment of the payments into securities and the contractor shall receive the interest earned on the investments upon the same terms provided for in this section for securities deposited by the contractor. Upon satisfactory completion of the contract, the contractor shall receive from the escrow agent all securities, interest, and payments received by the escrow agent from the owner, pursuant to the terms of this section. (d) Securities eligible for investment under this section shall include those listed in Section 16430 of the Government Code, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the contractor and the public agency.

The contractor shall be the beneficial owner of any securities substituted for moneys withheld and shall receive any interest thereon.

Failure to include these provisions in bid and contract documents shall void any provisions for performance retentions in a public agency contract.

For purposes of this section, the term “public agency” shall include, but shall not be limited to, chartered cities.
(e) (1) Any contractor who elects to receive interest on moneys withheld in retention by a public agency shall, at the request of any subcontractor, make that option available to the subcontractor

Page 525 of 758 ends

CD-29
06/2026/A26-0119/BidDocs
regarding any moneys withheld in retention by the contractor from the subcontractor. If the contractor elects to receive interest on any moneys withheld in retention by a public agency, then the subcontractor shall receive the identical rate of interest received by the contractor on any retention moneys withheld from the subcontractor by the contractor, less any actual pro rata costs associated with administering and calculating that interest. In the event that the interest rate is a fluctuating rate, the rate for the subcontractor shall be determined by calculating the interest rate paid during the time that retentions were withheld from the subcontractor. If the contractor elects to substitute securities in lieu of retention, then, by mutual consent of the contractor and subcontractor, the subcontractor may substitute securities in exchange for the release of moneys held in retention by the contractor.
(2) This subdivision shall apply only to those subcontractors performing more than five percent of the contractor’s total bid.
(3) No contractor shall require any subcontractor to waive any provision of this section. (f) The Legislature hereby declares that the provisions of this section are of statewide concern and are necessary to encourage full participation by contractors and subcontractors in public contract procedures.
(g) The escrow agreement used hereunder shall be null, void, and unenforceable unless it is substantially similar to the following form:

ESCROW AGREEMENT FOR

SECURITY DEPOSITS IN LIEU OF RETENTION
This Escrow Agreement is made and entered into by and between whose address is
hereinafter called “Owner,”
whose address is
hereinafter called “Contractor” and
whose address is

Page 526 of 758 ends

CD-30
06/2026/A26-0119/BidDocs
hereinafter called “Escrow Agent.”
For the consideration hereinafter set forth, the Owner, Contractor, and Escrow Agent agree as follows:
(1) Pursuant to Section 22300 of the Public Contract Code of the State of California, Contractor has the option to deposit securities with Escrow Agent as a substitute for retention earnings required to be withheld by Owner pursuant to the Construction Contract entered into between the Owner and Contractor for ____ in the amount of ____ dated ____ (hereinafter referred to as the “Contract”). Alternatively, on written request of the Contractor, the Owner shall make payments of the retention earnings directly to the Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the Owner within 10 days of the deposit. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract between the Owner and Contractor. Securities shall be held in the name of ____, and shall designate the Contractor as the beneficial owner. (2) The Owner shall make progress payments to the Contractor for those funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above. (3) When the Owner makes payment of retentions earned directly to the Escrow Agent, the Escrow Agent shall hold them for the benefit of the Contractor until the time that the escrow created under this contract is terminated. The Contractor may direct the investment of the payments into securities. All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the Owner pays the Escrow Agent directly.
(4) Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering the Escrow Account and all expenses of the Owner. These expenses and payment terms shall be determined by the Owner, Contractor, and Escrow Agent. (5) The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the Owner. (6) Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from the Owner to the Escrow Agent that Owner consents to the withdrawal of the amount sought to be withdrawn by Contractor.

Page 527 of 758 ends

CD-31
06/2026/A26-0119/BidDocs
(7) The Owner shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven days’ written notice to the Escrow Agent from the owner of the default, the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by the Owner.
(8) Upon receipt of written notification from the Owner certifying that the Contract is final and complete, and that the Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges.
(9) Escrow Agent shall rely on the written notifications from the Owner and the Contractor pursuant to Sections (5) to (8), inclusive, of this Agreement and the Owner and Contractor shall hold Escrow Agent harmless from Escrow Agent’s release and disbursement of the securities and interest as set forth above.
(10) The names of the persons who are authorized to give written notice or to receive written notice on behalf of the Owner and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows:

On behalf of Owner: On behalf of Contractor:

Title Title
Name Name
Signature Signature
Address Address
On behalf of Escrow Agent:

Page 528 of 758 ends

CD-32
06/2026/A26-0119/BidDocs
Title
Name
Signature
Address
At the time the Escrow Account is opened, the Owner and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Agreement.

IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above.

Owner Contractor
Title Title
Name Name
Signature Signature

Page 529 of 758 ends

CD-33
06/2026/A26-0119/BidDocs
Public Contract Code Section 9204
(a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240) of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100) of Part 2, and Article 1.5 (commencing with Section 20104) of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section:
(1) "Claim" means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled.
(C) Payment of an amount that is disputed by the public entity. (2) "Contractor" means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) "Public entity" means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, CITY, special CITY, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency.
(B) "Public entity" shall not include the following:
(i) The Department of Water Resources as to any project under the jurisdiction of that department.
(ii) The Department of Transportation as to any project under the jurisdiction of that department.

The Department of Parks and Recreation as to any project under the jurisdiction of that department.

Page 530 of 758 ends

CD-34
06/2026/A26-0119/BidDocs
(iii) The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code.
(iv) The Military Department as to any project under the jurisdiction of that department.
(v) The Department of General Services as to all other projects. (vi) The High-Speed Rail Authority.
(4) "Public works project" means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind.
(5) "Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision.
(B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45- day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion.
(D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. (B) (A) If the claimant disputes the public entity's written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute Within 10 business days following the conclusion of the meet and confer conference,

Page 531 of 758 ends

CD-35
06/2026/A26-0119/BidDocs
if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.
(D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties' dispute. (2) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity's failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(3) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(4) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the

Page 532 of 758 ends

CD-36
06/2026/A26-0119/BidDocs
public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.
(i) This section shall remain in effect only until January 1, 2020, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date.
- END OF CONTRACT DOCUMENTS -

Page 533 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 1

GENERAL CONDITIONS

Page 534 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 2

GENERAL CONDITIONS
ARTICLE 1 -- DEFINITIONS
Wherever used in these General Conditions or in the other Contract Documents the following terms have the meanings indicated which are applicable to both the singular and plural thereof.

Where an entire word is capitalized in the definitions and is found un-capitalized in the Contract Documents it has the ordinary dictionary definition.

Addenda - Written or graphic instruments issued prior to the opening of Bids which make additions, deletions or revisions to the Contract Documents.

Agent - CONSTRUCTION MANAGER is the Agent of OWNER.

Agreement - The written contract between OWNER and CONTRACTOR covering the WORK to be performed; other documents are attached to the Agreement and made a part thereof as provided therein.

Allowance - A Bid item that adds a specified quantity of WORK to the Agreement work scope which OWNER may unilaterally direct CONTRACTOR to perform, or elect not to have performed.

Application for Payment - The form furnished by CONSTRUCTION MANAGER which is to be used by CONTRACTOR to request progress or Final Payment and which is to be accompanied by such supporting documentation as is required by the Contract Documents.

Asbestos - Any material that contains more than one (1) percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration (“OSHA”).

Beneficial Occupancy - Use by OWNER of the WORK prior to final acceptance.

Bidder - Any individual, firm, partnership, corporation or combination thereof, submitting a Bid for the WORK, acting directly or through a duly authorized representative.

Bid - The offer or proposal of the Bidder submitted on the prescribed form setting forth the price or prices for the WORK.

Bidding Documents - The advertisement or Invitation to Bid, Instructions to Bidders, the Bid form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids).

Bonds - Bid, Performance and Payment Bonds and other instruments, which protect against loss due to inability or refusal of CONTRACTOR to perform its contract.

Page 535 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 3
Change Order - A document recommended by CONSTRUCTION MANAGER, which is signed by CONTRACTOR and OWNER and authorizes an addition, deletion or revision in the WORK, or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement.

CITY - OWNER (See OWNER’s definition in this section).

City of El Centro - OWNER (See OWNER’s definition in this section).

Claim - A dispute becomes a Claim only after CONTRACTOR receives and refuses to accept CONSTRUCTION MANAGER’s initial determination, and is certified as required by Article

16.3. Codes - The terms Government Code, Labor Code, etc. refer to codes of the State of California.

CONSTRUCTION MANAGER - The individual, partnership, corporation, joint venture or other legal entity named as such by written notice from OWNER.

Construction Manager Order - A written order issued by CONSTRUCTION MANAGER which clarifies or interprets the Procurement Documents or orders minor changes or alterations in the scope of WORK to be furnished but which does not involve a change in the Contract Price or the Contract Time.

Contract Documents - The Notice Inviting Bids, Instructions to Bidders, Bid forms (including the Bid, Bid schedule(s), information required of Bidder, Bid bond, and all required certificates and affidavits), Agreement, Performance Bond, Payment Bond, General Conditions, Supplementary General Conditions, SPECIAL PROVISIONS, Drawings and all Addenda, and Change Orders executed pursuant to the provisions of the Contract Documents.

Contract Milestone - A principal event specified in the Contract Documents relating to an intermediate completion date of a portion of the WORK, or a period of time within which the portion of the WORK should be performed prior to Substantial Completion of all the WORK.

Contract Price - The total monies payable by OWNER to CONTRACTOR under the terms and conditions of the Contract Documents.

Contract Time - The number of successive calendar Days stated in the Contract Documents for the completion of the WORK.

CONTRACTOR - The individual, partnership, corporation, joint venture or other legal entity with whom OWNER has executed the Agreement.

Day - A calendar day of twenty-four (24) hours measured from midnight to the next midnight.

Defective Work - Work that is unsatisfactory, faulty or deficient; or that does not conform to the Contract Documents; or that does not meet the requirements of any inspection, reference standard,

Page 536 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 4
test or approval referred to in the Contract Documents; or work that has been damaged by anyone other than OWNER prior to CONSTRUCTION MANAGER’s recommendation of final payment.

DESIGN CONSULTANT - The individual, partnership, corporation, joint venture or other legal entity named as such in the Contract Documents or succeeding entity.

Demobilization - The complete dismantling and removal by CONTRACTOR of all of CONTRACTOR’s temporary facilities, equipment and personnel at the site.

Drawings - The drawings, plans, maps, profiles, diagrams and other graphic representations which indicate the character, location, nature, extent and scope of the WORK and which have been prepared by DESIGN CONSULTANT and are referred to in the Contract Documents. Shop Drawings are not Drawings as so defined.

Disputed Work - A dispute exists from the time CONTRACTOR disagrees with a decision or determination made by CONSTRUCTION MANAGER until CONSTRUCTION MANAGER renders an initial determination. If the issue is unresolved it becomes a Claim.

Effective Date of the Agreement - The date indicated in the Agreement on which it becomes effective, but if no such date is indicated it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver.

Engineer - Wherever the word Engineer is found in these Contract Documents or in any referenced document, it shall mean CONSTRUCTION MANAGER.

Field Order - A written order issued by OWNER which changes the Agreement WORK scope and involves a change in the Contract Price or Contract Time or the intent of the Agreement.

Final Payment - is defined as the last progress payment made to CONTRACTOR for earned funds, less retainage as applicable, less deductions listed in Article 14. CONTRACTOR is entitled to this payment when the Notice of Completion is issued.

General Conditions - Section General Conditions of the Contract Specification.

Hazardous Waste - The term Hazardous Waste shall have the meaning provided in Section 104 of the Solid Waste Disposal Act (42 USC Section 6903) as amended from time to time or, as defined in section 25117 of the Health and Safety Code, that is required to be removed to a class I, class II or class III disposal site in accordance with provisions of existing law, whichever is more restrictive.

Page 537 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 5
Holidays - Legal Holidays observed by OWNER occur on:

New Year’s Day - January 1
Martin Luther King’s Birthday - Third (3rd) Monday in January President’s Day - Third (3rd) Monday in February
Good Friday – The afternoon of the Friday before Easter Memorial Day - Last Monday in May
Juneteenth – June 19
Independence Day - July 4
Labor Day - First (1st) Monday in September
Veteran’s Day - November 11
Thanksgiving Day - Fourth (4th) Thursday in November
The Day after Thanksgiving – The Friday after the fourth (4th) Thursday in November Christmas Eve – The afternoon of December 24
Christmas Day - December 25
New Years Eve – The afternoon of December 31
If any Holiday listed above falls on a Saturday, Saturday and the preceding Friday are both legal Holidays. If the Holiday should fall on a Sunday, Sunday and the following Monday are both legal Holidays.

Interfacing Work - Work which connects to, abuts or meets with work of another contractor.

Laws and Regulations - Any and all applicable laws, rules, regulations, ordinances, codes and/or orders of any and all governmental bodies, agencies, authorities and courts having jurisdiction.

Lump Sum Work - Work to be paid on the basis of lump sum prices.

Mechanic’s Lien - A form of security, an interest in real property, which is held to secure the payment of an obligation. When referred to in these Contract Documents, Mechanic’s Lien or lien means Stop Notice.

Milestone - See Contract Milestone.

Mobilization - The establishment by CONTRACTOR of the temporary facilities, equipment and personnel at the site thereby enabling the WORK to commence.

Notice of Award - The written notice by OWNER to the apparent low Bidder stating that upon compliance by the apparent low Bidder with the conditions precedent enumerated therein within the time specified, OWNER will enter into an Agreement.

Notice of Completion - A form signed by DESIGN CONSULTANT, CONSTRUCTION MANAGER and CONTRACTOR recommending to OWNER that the WORK is complete and fixing the date of completion. After acceptance of the WORK by OWNER’s governing body, the form is signed by OWNER and filed with the County Recorder. This filing starts the thirty (30) Day lien filing period on the WORK.

Page 538 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 6
Notice to Proceed - The written notice issued by OWNER to CONTRACTOR authorizing CONTRACTOR to proceed with the WORK and establishing the date of commencement of the Contract Time.

OWNER’s Agent - CONSTRUCTION MANAGER is OWNER’s Agent.

OWNER - The City of El Centro, acting through its legally designated officials, officers or employees.

Partial Utilization - Use by OWNER of a substantially completed part of the WORK for the purpose for which it is intended prior to Substantial Completion of all the WORK. (See Beneficial Occupancy)
PCBs - Polychlorinated biphenyls.

Petroleum - Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (sixty (60) degrees Fahrenheit and fourteen and seventenths (14.7) pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene and oil mixed with other non-Hazardous Wastes and crude oils.

Project - The total construction of which the WORK to be provided under the Contract Documents may be the whole, or a part as indicated elsewhere in the Contract Documents.

Radioactive Material - Source, special nuclear or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Sections 2011 et seq.) as amended from time to time.

Request for Information - The standardized form furnished by OWNER for CONTRACTOR’s use when making written requests for information to CONSTRUCTION MANAGER, and upon which the response will be answered and returned.

Request for Proposal - The standardized form used by CONSTRUCTION MANAGER to request a proposal from CONTRACTOR for proposed changes in the WORK.

Samples - Physical examples of materials, equipment or workmanship that are representative of some portion of the WORK and which establish the standards by which such portion of the WORK will be judged.

Safety - Safety includes health and security.

Shop Drawings - All drawings, diagrams, illustrations, schedules and other data which are specifically prepared by or for CONTRACTOR and submitted by CONTRACTOR to illustrate some portion of WORK and all illustrations, brochures, standard schedules, performance charts, instructions and diagrams to illustrate material or equipment for some portion of the WORK.

Page 539 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 7
Specifications – The directions, provisions and requirements contained in the Bidding Documents, contract forms, conditions of the Agreement and the SPECIAL PROVISIONS, as listed in the Table of Contents.

Stop Notice - A legal remedy for Subcontractors and Suppliers who contribute to public works, but who are not paid for their work, which secures payment from construction funds possessed by OWNER. For public property, the Stop Notice remedy is designed to substitute for Mechanic’s Lien rights.

Submittals - The information which is specified for submission to CONSTRUCTION MANAGER in accordance with Article 6.20 of the General Conditions.

Sub-Consultant - The individual, partnership, corporation, joint venture or other legal entity having a direct contract with DESIGN CONSULTANT, CONSTRUCTION MANAGER or with any of their consultants to furnish services with respect to the Project and who is identified as such in the Supplementary General Conditions.

Subcontractor - An individual, partnership, corporation, joint venture or other legal entity having a direct contract with CONTRACTOR or with any other Subcontractor for the performance of a part of the WORK at the site.

Substantial Completion - Refers to when the WORK has progressed to the point where, in the opinion of CONSTRUCTION MANAGER as evidenced by Notice of Completion as applicable, it is sufficiently complete, in accordance with the Contract Documents, so that the WORK can be utilized for the purposes for which it is intended, and after the operation demonstration is complete, where applicable.

SPECIAL PROVISIONS – That section of the Contract Documents consisting of written technical descriptions of products and execution of the WORK.

Supplementary General Conditions- The part of the Contract Documents which make additions, deletions or revisions to these General Conditions.

Supplier - A manufacturer, fabricator, supplier, distributor, material worker or vendor.

Underground Utilities - All pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments, and any encasement containing such facilities which have been installed underground to furnish any of the following services or materials: electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems or water.

Unit Price Work - Specific WORK scope included in the Agreement WORK scope to be paid for on the basis of unit prices. OWNER may unilaterally direct CONTRACTOR to perform the WORK, or elect not to have the WORK performed.

Page 540 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 8
WORK - The entire completed construction or the various separately identifiable parts thereof required to be furnished under the Contract Documents. WORK is the result of performing or furnishing labor and furnishing and incorporating materials and equipment into the construction, and performing or furnishing services and furnishing documents, all as required by the Contract Documents.

Work Change Directive - A written directive to CONTRACTOR, issued on or after the Effective Date of the Agreement and recommended by CONSTRUCTION MANAGER, and signed by OWNER ordering an addition, deletion or revision in the WORK, or responding to differing or unforeseen physical conditions under which the WORK is to be performed or to emergencies. A Work Change Directive will not change the Contract Price or the Contract Time, but is evidence that the parties expect that the change directed or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or Contract Time.

ARTICLE 2 -- PRELIMINARY MATTERS

2.1 DELIVERY OF BONDS/INSURANCE CERTIFICATES - When CONTRACTOR delivers the signed Agreements to OWNER, CONTRACTOR shall also deliver to OWNER such Bonds and Insurance Policies and Certificates as CONTRACTOR may be required to furnish in accordance with the Contract Documents.

2.2 COPIES OF DOCUMENTS - OWNER shall furnish to CONTRACTOR ten (10) copies of the Contract Documents as specified in the Agreement and ten (10) sets of full-scale Drawings.

Additional quantities of the Contract Documents will be furnished at reproduction cost.

2.3 COMMENCEMENT OF CONTRACT TIME; NOTICE TO PROCEED - The Contract Time will start to run on the commencement date stated in the Notice to Proceed.

2.4 STARTING THE WORK - CONTRACTOR shall begin to perform the WORK within ten (10) Days after the commencement date stated in the Notice to Proceed, but no work shall be done at the site prior to said commencement date. In addition, any requirements in the Supplemental General Conditions must be satisfied.

2.5 CONTRACTOR MUST STUDY CONTRACT DOCUMENTS - Before undertaking each part of the WORK, CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements.

CONTRACTOR shall promptly report in writing to CONSTRUCTION MANAGER any conflict, error or discrepancy which CONTRACTOR may discover and shall obtain a written interpretation or clarification from CONSTRUCTION MANAGER before proceeding with any work affected thereby.

2.6 PRELIMINARY SUBMITTALS - Preliminary submittals shall be provided to CONSTRUCTION MANAGER in accordance with Division 1 requirements.

Page 541 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 9

2.7 PRECONSTRUCTION CONFERENCE - CONTRACTOR is required to attend a preconstruction conference. This conference will be attended by CONSTRUCTION MANAGER and others as appropriate in order to discuss the WORK in accordance with the applicable procedures specified in the General Requirements.

CONTRACTOR is required to schedule and attend a preconstruction conference with the Imperial Irrigation District (“IID”) prior to the construction or demolition of any electrical improvements.

2.8 SUBCONTRACTOR MOBILIZATION MEETING - Prior to the start of each major Subcontractor’s site work, CONTRACTOR, the involved Subcontractor and CONSTRUCTION MANAGER shall attend a pre-start meeting to discuss the schedule, coordination, procedures and other administrative issues.

2.9 CONTRACTOR DUTY TO ADVISE OWNER OF KNOWN OR DISCOVERED PROBLEMS - CONTRACTOR is reminded of his obligation to advise OWNER of any errors and/or omissions in the Contract Documents, or changes to thereof, which CONTRACTOR may be aware through special knowledge or discovered during the Bid process.

ARTICLE 3 -- CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE

3.1 INTENT - The Contract Documents comprise the entire agreement between OWNER and CONTRACTOR concerning the WORK. The Contract Documents are complementary; what is called for by one is as binding as if called for by all. The Contract Documents will be construed in accordance with the law of the place of the WORK.

3.2 INTENT OF WORK TO BE FUNCTIONALLY COMPLETE

3.2.1 Work to be Complete - It is the intent of the Contract Documents to describe the WORK to be constructed in accordance with the Contract Documents. Any work, materials or equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the intended result shall be supplied whether or not specifically called for or identified in the Contract Documents. When words or phrases which have a wellknown technical or construction industry or trade meaning are used to describe work, materials or equipment, such words or phrases shall be interpreted in accordance with that meaning unless a definition has been provided in Article 1 of the General Conditions.

3.2.2 Necessary Utilities - If utilities to equipment/fixtures are not shown but are necessary to operate the equipment/fixtures, the utilities service installation is considered to be part of the WORK. The implied WORK will conform to the appropriate sections of the technical Specifications.

3.3 CLARIFICATIONS AND INTERPRETATIONS OF THE CONTRACT DOCUMENTS

3.3.1 Referenced Standards - Reference to standard specifications, manuals or Codes of any technical society, organization or association or to the laws or regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard

Page 542 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 10
specification, manual, code or laws or regulations in effect at the time of opening of Bids, except as may be otherwise specifically stated. However, no provision of any referenced standard specification, manual or code shall be effective to change the duties and responsibilities of OWNER, CONTRACTOR or CONSTRUCTION MANAGER or any of their consultants, agents or employees from those set forth in the Contract Documents.

3.3.2 Discovery of Problem Notice - If, during the performance of the WORK, CONTRACTOR discovers any conflict, error, ambiguity or discrepancy with the WORK within the Contract Documents or between the Contract Documents and any provision of any such Laws and Regulations applicable to the performance of the WORK or of any such standard, specification, manual or code or of any instruction of any Supplier, CONTRACTOR shall report it to CONSTRUCTION MANAGER in writing within seven (7) calendar Days of discovery.

CONTRACTOR shall not proceed with the WORK affected thereby, except in an emergency, unless directed by CONSTRUCTION MANAGER. Any WORK performed by CONTRACTOR that is not directed by CONSTRUCTION MANAGER shall be at its own risk.

3.3.3 Order of Precedence of Contract Documents - In resolving conflicts resulting from errors or discrepancies in any of the Contract Documents, the order of precedence shall be as follows:

3.3.3.1 Permits from other agencies as may be required by law.

3.3.3.2 Change Orders

3.3.3.3 Agreement

3.3.3.4 Addenda

3.3.3.5 CONTRACTOR’s Bid (Bid Form)

3.3.3.6 Notice Inviting Bids

3.3.3.7 Instructions to Bidders

3.3.3.8 Supplementary General Conditions

3.3.3.9 General Conditions

3.3.3.10 SPECIAL PROVISIONS

3.3.3.11 Drawings

3.3.3.12 Referenced Standard Specifications

3.3.4 Order of Precedence of the Drawings - With reference to the Drawings the order of precedence is as follows:

Page 543 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 11

3.3.4.1 Figures govern over scaled dimensions

3.3.4.2 Detail drawings govern over general drawings

3.3.4.3 Addenda/Change Order drawings govern over Contract Drawings

3.3.4.4 Contract Drawings govern over standard drawings

3.4 AMENDING AND SUPPLEMENTING CONTRACT DOCUMENTS

3.4.1 Amending Contract Documents - The Contract Documents may be amended to provide for additions, deletions and revisions in the WORK or to modify the terms and conditions thereof by a Change Order pursuant to Article 10.

3.4.2 Supplementing Contract Documents - The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the WORK may be authorized, by:

3.4.2.1 - A Construction Manager Order issued by CONSTRUCTION MANAGER.

3.4.2.2 - DESIGN CONSULTANT’s approval of a Shop Drawing or Sample pursuant to Article 6 3.4.2.3 - DESIGN CONSULTANT’s written interpretation or clarification

3.5 REUSE OF DOCUMENTS - Neither CONTRACTOR, nor any Subcontractor or Supplier, nor any other person or organization performing any of the WORK under a contract with OWNER shall have or acquire any title to or ownership rights in any of the Drawings, technical Specifications or other documents used on the WORK, and they shall not reuse any of them on the extensions of the Project or any other project without written consent of OWNER.

ARTICLE 4 -- AVAILABILITY OF LANDS; PHYSICAL CONDITIONS; REFERENCE POINTS

4.1 AVAILABILITY OF LANDS - OWNER shall furnish, as indicated in the Contract Documents, the lands upon which the WORK is to be performed, rights-of-way and easements for access thereto, and such other lands which are designated for the use of CONTRACTOR.

Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by OWNER, unless otherwise provided in the Contract Documents. Nothing contained in the Contract Documents shall be interpreted as giving CONTRACTOR exclusive occupancy of the lands or rights-of-way provided. CONTRACTOR shall provide, at no additional cost, for all additional lands and access thereto that may be required for temporary construction facilities, borrow areas, waste disposal areas or storage of materials and equipment; provided that CONTRACTOR shall not enter upon nor use any property not under the control of OWNER until a written temporary construction easement agreement has been executed by CONTRACTOR and the property owner, and a copy of said easement furnished to CONSTRUCTION MANAGER prior to said use; and, neither OWNER nor CONSTRUCTION MANAGER shall be liable for any

Page 544 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 12
claims or damages resulting from CONTRACTOR’s unauthorized trespass or authorized use of any such properties.

4.2 PHYSICAL SITE CONDITIONS

4.2.1 Reports and Drawings - Reference is made to the Supplementary General Conditions for identification of:

4.2.1.1 Subsurface Condition Reports - Those reports of explorations and tests of subsurface conditions at or contiguous to the site that have been utilized by DESIGN CONSULTANT in preparing the Contract Documents; and

4.2.1.2 Drawings of Existing Structures - Reference is made to the Supplementary General Conditions for identification of those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Utilities referred to in section 4.4 of Article 4 herein) which are at or contiguous to the site that have been utilized in the preparation of the Contract Documents.

4.2.2 Limited Reliance By CONTRACTOR On The Technical Data - CONTRACTOR may rely upon the accuracy of the technical data contained in such drawings or reports, however, nontechnical data, interpretations and opinions contained in such drawings or reports are not to be relied on by CONTRACTOR. CONTRACTOR may not rely upon or make any claims against OWNER, DESIGN CONSULTANT or CONSTRUCTION MANAGER with respect to:

4.2.2.1 the completeness of such reports and drawings for CONTRACTOR’s purposes, including, but not limited to, any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR and Safety precautions and programs incident thereto, or

4.2.2.2 other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings, or

4.2.2.3 any CONTRACTOR interpretation of or conclusion drawn from any technical data or any such data, interpretations, opinions or information.

4.3 DIFFERING SITE CONDITIONS - If CONTRACTOR believes that any subsurface or physical condition at or contiguous to the site that is uncovered or revealed either:

4.3.1 is of such a nature as to establish that any technical data on which CONTRACTOR is entitled to rely as provided in paragraphs 4.2.1 is materially inaccurate, or

4.3.2 is of such a nature as to require a change in the Contract Documents, or

4.3.3 differs materially from that shown or indicated in the Contract Documents, or

Page 545 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 13

4.3.4 is of an unusual nature and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents, CONTRACTOR shall immediately report it to CONSTRUCTION MANAGER then CONTRACTOR shall, promptly after becoming aware thereof and before further disturbing conditions thereby or performing any work in connection therewith (except in an emergency as permitted by paragraph 6.23), notify OWNER and CONSTRUCTION MANAGER in writing about such condition. CONTRACTOR shall not further disturb such conditions or perform any work in connection therewith (except as aforesaid) until receipt of written order to do so.

4.3.5 OWNER Responsibility - OWNER shall promptly investigate the conditions, and if it finds that the conditions do materially so differ and cause a decrease or increase in CONTRACTOR’s cost of, or the time required for, performance of any part of the WORK, OWNER shall issue a Change Order under the procedures described in Article 10. If OWNER determines that there is no bona fide work scope change or is a minor change which does not impact time or cost, OWNER shall notify CONTRACTOR of this finding within thirty (30) Days.

4.3.6 Disputed Work – If CONTRACTOR and OWNER are unable to reach agreement on Disputed Work, OWNER may direct CONTRACTOR to proceed with the WORK. Payment shall be as later directed, by mediation or arbitration, if OWNER and CONTRACTOR agree thereto, or as fixed in a court of law.

Although not to be construed as proceeding under extra work provisions, CONTRACTOR shall keep and furnish records of Disputed Work in accordance with 11.3.

4.3.7 Disallowance of Entitlement - CONTRACTOR shall not be entitled to any adjustment in the Contract Price or Contract Time or will be deemed to have waived his right to such a claim if:

4.3.7.1 CONTRACTOR knew of the existence of such conditions at the time CONTRACTOR made a final commitment to OWNER in respect of Contract Price and Contract Time by the submission of a Bid or becoming bound under the Agreement; or

4.3.7.2 the existence of such condition could reasonably have been discovered or revealed as a result of any examination, investigation of the site and contiguous areas suggested or required by the Bidding Documents: or

4.3.7.3 CONTRACTOR failed to give the written notice within the time and as required by Article

3.3.2. 4.4 UNDERGROUND UTILITIES

4.4.1 Utilities Indicated - The information and data indicated in the Contract Documents with respect to existing Underground Utilities at or contiguous to the site are based on information and data furnished to OWNER or CONSTRUCTION MANAGER by the owners of such Underground Utilities or by others. Unless it is expressly provided in the Supplementary General Conditions and/or the General Conditions, OWNER and CONSTRUCTION MANAGER shall not be responsible for the accuracy or completeness of any such information or data, and CONTRACTOR

Page 546 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 14
shall have full responsibility for reviewing and checking all such information and data, for locating all Underground Utilities indicated in the Contract Documents, for coordination of the WORK with the owners of such Underground Utilities during construction, for the Safety and protection thereof and repairing any damage thereto resulting from the WORK, the cost of which will be considered as having been included in the Contract Price.

4.4.2 Utilities Not Indicated - If Underground Utilities are uncovered or revealed at or contiguous to the site which was not indicated in the Contract Documents and which CONTRACTOR could not reasonably have been expected to be aware of, CONTRACTOR shall identify the owner of such Underground Utilities and give written notice thereof to that owner and shall notify CONSTRUCTION MANAGER in accordance with the requirements of the General Conditions and General Requirements.

4.4.3 Action Prior To Starting Work - As provided in section 4216 of the California Government Code, at least two (2) working Days prior to commencing any excavation, CONTRACTOR shall contact the regional notification center (Underground Service Alert of Southern California) and obtain an inquiry identification number.

4.4.4 Locate Utilities - CONTRACTOR shall determine the location and depth of all utilities, including service connections, which have been marked by the respective owners and which may affect or be affected by its operations. Full compensation for such work shall be considered as included in CONTRACTOR’s Bid price.

4.4.5 Protection Of Utilities - CONTRACTOR shall not interrupt the service function or disturb the support of any utility, without authority from OWNER or order from the utility owner. All valves, switches, vaults and meters shall be maintained readily accessible for emergency shutoff.

Where protection is required to ensure support of utilities located as shown on the Plans, CONTRACTOR shall, unless otherwise provided, furnish and place the necessary protection at its expense.

4.4.6 Notification Requirements If Utility Disturbed - CONTRACTOR shall immediately notify CONSTRUCTION MANAGER and utility owner if any utility is disturbed or damaged.

CONTRACTOR shall bear the costs of repair or replacement of any utility damaged by CONTRACTOR.

4.4.7 Removal Of Abandoned Utilities - Unless otherwise specified, CONTRACTOR shall remove all interfering portions of utilities shown on the Plans or indicated in the Bidding Documents as abandoned. Before starting removal operations, CONTRACTOR shall ascertain from the Utility Owner whether the abandonment is complete. The costs involved in the removal and disposal shall be included in the price for the item of work necessitating such removals.

4.4.8 Relocation Of Utilities

4.4.8.1 When the Plans or Specifications provide for CONTRACTOR to alter, relocate or reconstruct a utility, all costs for such work shall be included in the Bid.

Page 547 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 15

4.4.8.2 Temporary or permanent relocation or alteration of indicated utilities requested by CONTRACTOR for its convenience shall be its responsibility, and CONTRACTOR shall make all arrangements and bear all costs.

4.4.8.3 After award of the Agreement, portions of utilities not indicated in the Contract Documents which are found to interfere with the WORK may be relocated, altered or reconstructed by the utility owner, or CONSTRUCTION MANAGER may order changes in the WORK to avoid interference. Such changes will be paid for in accordance with Article 10.

4.4.9 Delays

4.4.9.1 CONTRACTOR shall immediately notify in writing the utility owner and CONSTRUCTION MANAGER of its construction schedule and any subsequent changes in the construction schedule which will affect the time available for protection, removal or relocation of utilities.

4.4.9.2 CONTRACTOR will not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if correctly located, as noted in the Contract Documents.

4.4.9.3 CONTRACTOR may be given a no cost extension of time for unforeseen delays attributable to unreasonably protracted interferences by others in the relocation of utilities.

4.4.10 Access to the WORK - When necessary, CONTRACTOR shall so conduct its operations as to permit access to the WORK site and provide time for utility work to be accomplished during normal work hours during the progress of the WORK.

4.5 REFERENCE POINTS

4.5.1 Bench Mark - The CONSTRUCTION MANAGER will provide one (1) benchmark, near or on the site of the WORK, and will provide two (2) points near or on the site to establish a base line for use by CONTRACTOR for alignment control. Unless otherwise specified in the General Requirements, CONTRACTOR shall furnish all other lines, grades and benchmarks required for proper execution of the WORK.

4.5.2 Protection of Bench Marks - CONTRACTOR shall preserve all bench marks, stakes and other survey marks, and in case of their removal or destruction by any party, CONTRACTOR shall be responsible for the accurate replacement of such reference points by personnel qualified under Division 3, Chapter 15 of the California Business and Professions Code. CONTRACTOR shall report to CONSTRUCTION MANAGER whenever a reference point is lost, destroyed or requires relocation.

4.6 ASBESTOS, PCBS, PETROLEUM, HAZARDOUS WASTE OR RADIOACTIVE

MATERIAL

Page 548 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 16

4.6.1 OWNER Responsibility - OWNER shall be responsible for any hazardous material which includes hazardous substances and hazardous waste as defined by sections 25316 and 25117 of the Health and Safety Code, uncovered or revealed at the site which was not identified in the Contract Documents to be within the scope of the WORK. OWNER shall not be responsible for any such materials brought to the site by CONTRACTOR, Subcontractors, Suppliers or anyone else for whom CONTRACTOR is responsible.

4.6.2 CONTRACTOR’s Responsibility - When such hazardous material is encountered, CONTRACTOR shall immediately stop all work in connection with such hazardous condition in any area affected thereby (except in an emergency as required by Article 6) and notify OWNER and CONSTRUCTION MANAGER in writing. OWNER shall promptly evaluate such hazardous condition and take corrective action. CONTRACTOR shall not be required to resume work in any such affected area until after OWNER has delivered to CONTRACTOR written notice specifying that such condition and any affected area has been rendered safe for the reassumption of work, or specifying any special conditions under which such work may be resumed safely.

4.6.3 Dispute - If, after receipt of such special written notice, CONTRACTOR does not agree to resume work based on a reasonable belief it is unsafe, or does not agree to resume work under such special conditions, then OWNER may order such portion of the work that is in connection with such hazardous condition or in such affected area to be deleted from the WORK. OWNER may have such deleted portion of the work performed by OWNER’s own forces or others in accordance with Article 7. If OWNER and CONTRACTOR cannot agree as to entitlement to or the amount or extent of an adjustment, if any, in Contract Price or Contract Time as a result of work stoppage or of deleting such portion of the WORK, then either party may make a Claim as provided in Article 16.

4.6.4 OWNER Hold Harmless - To the fullest extent permitted by Laws and Regulations, OWNER shall indemnify and hold harmless CONTRACTOR, Subcontractors, CONSTRUCTION MANAGER, DESIGN CONSULTANT and the officers, directors, employees, agents, other consultants and Subcontractors of each and any of them from and against all claims, costs, losses and damages arising out of or resulting from such hazardous condition, provided that any such claim, cost, loss or damage is attributable to bodily injury, sickness, disease or death or to the destruction of tangible property and provided further that any such claim, cost loss or damage is not caused by the consequences of that person’s or entity’s own negligence.

ARTICLE 5 -- BONDS AND INSURANCE

5.1 PERFORMANCE, PAYMENT AND OTHER BONDS

5.1.1 Bond Requirement - CONTRACTOR shall furnish Performance and Payment Bonds, each in the amount set forth in the Supplementary General Conditions as security for the faithful performance and payment of all CONTRACTOR’s obligations under the Contract Documents.

These Bonds shall remain in effect at least until one (1) year after the filing date of Notice of Completion, except as otherwise provided by law or regulation or by the Contract Documents.

CONTRACTOR shall also furnish such other Bonds as are required by the Supplementary General Conditions.

Page 549 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 17

5.1.2 Licensed Surety - All Bonds shall be in the form prescribed by the Contract Documents and by such sureties which are admitted insurers in the State of California and are subject to regulation by the Department of Insurance, and which also satisfy the requirements stated in section 995.660 of the Code of Civil Procedure, except as provided otherwise by Laws or Regulations. All Bonds signed by an agent must be accompanied by a certified copy of such agent’s authority to act. Surety companies must be duly licensed or authorized in the jurisdiction in which the Project is located to issue Bonds for the limits so required. Such surety companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary General Conditions.

5.1.3 Bankrupt or Insolvent Surety - If the surety on any Bond furnished by CONTRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the WORK is located, CONTRACTOR shall within seven (7) Days thereafter substitute another Bond and Surety, which must be acceptable to OWNER per paragraph 5.1.1 and

5.1.2 above.

5.2 INSURANCE

5.2.1 Insurance Policy Requirements - CONTRACTOR shall purchase and maintain the insurance required under the Construction Services Agreement.

5.2.7 Subcontractor’s Insurance - CONTRACTOR shall either require each of its Subcontractors to procure and to maintain public liability and property damage insurance and vehicle liability insurance of the type and in the amounts specified for CONTRACTOR in the Supplementary General Conditions or insure the activities of its Subcontractors in CONTRACTOR’s own policy, in like amount.

5.2.9 Restriction on Start of Site Work - CONTRACTOR shall not perform any WORK unless CONTRACTOR has in full force and effect all required insurance. CONTRACTOR shall not allow any Subcontractor, Supplier or other organization to perform WORK unless the Workers’ Compensation requirements have been met.

5.2.10 Increasing Insurance Limits - OWNER may direct CONTRACTOR to increase insurance limits. CONTRACTOR will be entitled to a Contract Price adjustment based on the substantiated premium costs.

ARTICLE 6 -- CONTRACTOR’S RESPONSIBILITIES

6.1. Responsibility Of CONTRACTOR To Perform - Unless otherwise specified in the Contract Documents, CONTRACTOR shall furnish and assume full responsibility for all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities and all other facilities and incidentals necessary for the furnishing, performance, testing, start-up and completion of the WORK. Such support that may need to be provided after normal working hours will be provided by CONTRACTOR at its expense.

Page 550 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 18

6.2 Labor, Materials and Equipment All materials and equipment to be incorporated into the WORK shall be of good quality and new, except as otherwise provided in the Contract Documents.

All warranties and guarantees specifically called for by the Specifications shall expressly run to the benefit of OWNER. If required by CONSTRUCTION MANAGER, CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the kind and quality of materials and equipment. All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with the instructions of the applicable Supplier except as otherwise provided in the Contract Documents; but no provisions of any such instructions will be effective to assign to CONSTRUCTION MANAGER, any duty or authority to supervise or direct the furnishing or performance of the WORK.

6.2.1 The completed work shall include all necessary permanent Safety devices, such as machinery guards, emergency stops and similar Safety items required by OSHA, Cal-OSHA and other Federal, State and local health and Safety regulations. In addition, all equipment, products, components and/or package systems shall be designed, fabricated and installed in compliance with Seismic Zone 4 structural criteria. Further, any features of the work (including OWNER-selected equipment) subject to such Safety regulations and structural criteria shall be fabricated, furnished and installed in compliance with Seismic Zone 4 structural criteria. CONTRACTOR shall include provisions of this Article in his agreements with Subcontractors, Suppliers and manufacturers of equipment and/or products.

In selecting and/or accepting equipment and/or products for installation in the WORK, OWNER, DESIGN CONSULTANT and CONSTRUCTION MANAGER assume no responsibility for the injury, property damage or any other damages or claims resulting from failure of the equipment, products, components and/or package systems to comply with applicable Safety Codes or requirements, or the Safety requirements of a recognized agency, or failure due to manufacturer’s faulty design concepts, or Defective Work and materials. CONTRACTOR shall defend, indemnify and hold OWNER, DESIGN CONSULTANT and CONSTRUCTION MANAGER harmless against any and all liability, claims, suits, damages, costs or expenses caused or claimed to be caused in whole or in part by the negligence or willful misconduct of the construction CONTRACTOR connected with the WORK. However, this indemnity will not extend to any loss, damage or expense caused by the established sole gross negligence or willful misconduct of OWNER or OWNER’s Agents, servants or independent contractors.

6.3 SUPERVISION, SUPERINTENDENCE AND QUALITY - CONTRACTOR shall supervise, inspect and direct the WORK competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the WORK in accordance with the Contract Documents. CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences and procedures of construction and Safety precautions and programs incidental thereto. CONTRACTOR shall be responsible to see that the completed WORK complies accurately with the Contract Documents. CONTRACTOR is solely responsible for the quality of the WORK.

6.4 SUPERINTENDENT

Page 551 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 19

6.4.1 Written Designation of Superintendent - CONTRACTOR shall designate in writing and keep on the work site at all times during its progress a technically qualified, English-speaking superintendent and an alternate who are employees of CONTRACTOR and who shall not be replaced without written notice to OWNER and CONSTRUCTION MANAGER. The superintendent will be CONTRACTOR’s representative at the site and shall have authority to act on behalf of CONTRACTOR. All communications given to the superintendent shall be as binding as if given to CONTRACTOR. CONTRACTOR shall issue all its communications to OWNER and DESIGN CONSULTANT through CONSTRUCTION MANAGER.

6.4.2 Superintendent’s Presence at Site - CONTRACTOR’s superintendent or alternate shall be present at the site of the WORK at all times while work is in progress, and shall be available by phone for emergencies twenty-four (24) hours per Day, seven (7) Days per week. Failure to observe this requirement shall be considered suspension of the WORK by CONTRACTOR until such time as such the superintendent is again present at the site.

6.4.3 Removal of Superintendent - Upon written notice, OWNER may require replacement and removal from the WORK of CONTRACTOR’s superintendent with cause, in which case CONTRACTOR shall submit a replacement superintendent subject to approval by OWNER, at no increase in Contract Price or Contract Time. Repeated Safety violation on the job site will be sufficient grounds for directing such replacement.

6.5 LABOR - CONTRACTOR shall provide competent, suitably-qualified personnel to survey and lay out the WORK and perform construction as required by the Contract Documents. Any person employed who is found to be incompetent, intemperate, troublesome, disorderly or otherwise objectionable, or who fails or refuses to perform work properly, acceptably and safely, shall be immediately removed from the WORK by CONTRACTOR and not be reemployed on the WORK. CONTRACTOR shall furnish, erect, maintain and remove the construction plant and any temporary works as may be required. CONTRACTOR shall at all times maintain good discipline and order at the site and will not permit the use or consumption of drugs (illegal substances) or alcoholic beverages at the site.

6.5.1 No Additional Compensation for Overtime - Except as otherwise provided in this Article, CONTRACTOR shall receive no additional compensation for overtime work, (i.e., work in excess of eight (8) hours in any one (1) calendar Day or forty (40) hours in any one (1) calendar week) even though such overtime work may be required under emergency conditions and may be ordered by CONSTRUCTION MANAGER in writing. Additional compensation will be paid CONTRACTOR for overtime work only in the event extra work is ordered by CONSTRUCTION MANAGER, and the Change Order specifically authorizes the use of overtime work and then only to such extent as overtime wages are regularly being paid by CONTRACTOR for overtime work of a similar nature in the same locality.

6.5.2 Approval Required to Work Outside Normal Work Hours - Except in connection with the Safety or protection of persons or the WORK or property at the site or adjacent thereto, and except as otherwise indicated in the Contract Documents, all work at the site shall be performed during normal working hours, and CONTRACTOR will not permit overtime work or the performance of work on Saturday, Sunday or any holiday observed by OWNER without

Page 552 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 20
OWNER’s written consent. CONTRACTOR shall apply for this consent through CONSTRUCTION MANAGER. CONSTRUCTION MANAGER has to approve CONTRACTOR working Holidays, weekends or overtime. CONTRACTOR will be responsible for reimbursing OWNER for all cost to provide inspection services required to monitor WORK outside of normal working hours. CONTRACTOR will be charged for this actually incurred direct hourly cost plus OWNER-approved overhead cost plus OWNER-approved profit, and a deductive Change Order will be issued to cover this expense.

6.5.3 SUBCONTRACT LIMITATIONS - CONTRACTOR shall perform not less than twenty (20) percent of the WORK with its own forces without subcontracting. This requirement refers to the WORK whose value will not be less than twenty (20) percent of the Contract Price.

6.6 PROGRESS SCHEDULE - CONTRACTOR shall adhere to the progress schedule established in accordance with the General Requirements as it may be adjusted from time to time as provided below:

6.6.1 Non Impacting Adjustments - CONTRACTOR shall submit to CONSTRUCTION MANAGER for acceptance proposed adjustments in the progress schedule that will not change the Contract Time (or Milestones). Such adjustments will conform generally to the progress schedule then in effect and additionally will comply with any provisions of the General Requirements applicable thereto.

6.6.2 Revisions To Milestones - Proposed revisions in the progress schedule that will change the Contract Times (or Milestones) shall be submitted in accordance with the requirements of Article

12. Such adjustments may only be made by a Change Order in accordance with Article 12 of the General Conditions.

6.7 SUBSTITUTES OR “OR-EQUAL” ITEMS - Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent or “or-equal” item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be submitted to CONSTRUCTION MANAGER for review under the circumstances described below.

6.7.1 “Or-Equal” Items: If in CONSTRUCTION MANAGER’s sole discretion an item of material or equipment proposed by CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in the WORK will be required, it may be considered by CONSTRUCTION MANAGER as an “or-equal” item, in which case review and approval of the proposed item may, in CONSTRUCTION MANAGER’s sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. A proposed item of material or equipment will be considered functionally equal to an item so named if:
a. in the exercise of reasonable judgment CONSTRUCTION MANAGER determines that:

Page 553 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 21
i. it is at least equal in materials of construction, quality, durability, appearance, strength and design characteristics;
ii. it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the WORK as a functioning whole; iii. it has a proven record of performance and availability of responsive service; and
b. CONTRACTOR certifies that, if approved and incorporated into the WORK:
i. there will be no increase in cost to OWNER or increase in Contract Time, and
ii. it will conform substantially to the detailed requirements of the item named in the Contract Documents.

6.7.2 Substitute Items
a. If in CONTRACT MANAGER’s sole discretion an item of material or equipment proposed by CONTRACTOR does not qualify as an “or-equal,” it will be considered a proposed substitute item.
b. CONTRACTOR shall submit sufficient information as provided below to allow CONTRACT MANAGER to determine that the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefore. Requests for review of proposed substitute items of material or equipment will not be accepted by CONTRACT MANAGER from anyone other than CONTRACTOR.
c. The procedure requirements for review by CONTRACT MANAGER will be as set forth in Paragraph 6.7.2.d, and as CONTRACT MANAGER may decide is appropriate under the circumstances.
d. CONTRACTOR shall make written application to CONTRACT MANAGER for review of a proposed substitute item of material or equipment that CONTRACTOR seeks to furnish or use. The application:
i. shall certify that the proposed substitute item will:

1. perform adequately the functions and achieve the results called for by the general design,

2. be similar in substance to that specified, and

3. be suited to the same use as that specified;
ii. will state:

1. the extent, if any, to which the use of the proposed substitute item will prejudice CONTRACTOR’s achievement of Substantial
Completion on time;

2. whether or not use of the proposed substitute item in the WORK will require a change in any of the Contract Documents (or in the provisions of any other direct contract with OWNER for other work on the Project) to adapt the design to the proposed substitute item; and

3. whether or not incorporation or use of the proposed substitute item in connection with the WORK is subject to payment of any license fee or royalty;
iii. will identify:

Page 554 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 22

1. all variations of the proposed substitute item from that specified, and

2. available engineering, sales, maintenance, repair and replacement services;
iv. and shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and claims of other contractors affected by any resulting change.

6.7.3 Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence or procedure of construction is expressly required by the Contract Documents, CONTRACTOR may furnish or utilize a substitute means, method, technique, sequence or procedure of construction approved by CONTRACT MANAGER. CONTRACTOR shall submit sufficient information to allow CONTRACT MANAGER, in CONTRACT MANAGER’s sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. The requirements for review by CONTRACT MANAGER will be similar to those provided in Paragraph 6.7.2.d.

6.7.4 Contract Manager’s Evaluation: CONTRACT MANAGER will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs

6.7.2.d and 6.7.3. CONTRACT MANAGER may require CONTRACTOR to furnish additional data about the proposed substitute item. CONTRACT MANAGER will be the sole judge of acceptability. No “or equal” or substitute will be ordered, installed or utilized until CONTRACT MANAGER’s review is complete, which will be evidenced by either a Change Order for a substitute or an approved Shop Drawing for an “or equal.” CONTRACT MANAGER will advise CONTRACTOR in writing of any negative determination.

6.7.5 Special Guarantee: OWNER may require CONTRACTOR to furnish at CONTRACTOR’s expense a special performance guarantee or other surety with respect to any substitute.

6.7.6 Contract Manager’s Cost Reimbursement: CONTRACT MANAGER will record CONTRACT MANAGER’s costs in evaluating a substitute proposed or submitted by CONTRACTOR pursuant to Paragraphs 6.7.2.d and 6.7.3. Whether or not CONTRACT MANAGER approves a substitute item so proposed or submitted by CONTRACTOR, CONTRACTOR shall reimburse OWNER for the charges of CONTRACT MANAGER for evaluating each such proposed substitute. CONTRACTOR shall also reimburse OWNER for the charges of CONTRACT MANAGER for making changes in the Contract Documents (or in the provisions of any other direct contract with OWNER) resulting from the acceptance of each proposed substitute.

6.7.7 CONTRACTOR’s Expense: CONTRACTOR shall provide all data in support of any proposed substitute or “or-equal” at CONTRACTOR’s expense

6.8 PROJECT SITE COORDINATION

Page 555 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 23

6.8.1 Work By Others - CONTRACTOR shall be responsible for ascertaining the nature and extent of any simultaneous, collateral and essential work by others as described in the General Requirements.

CONTRACTOR shall provide staging areas and include work windows for work by others into the overall construction schedule. No additional working days will be allowed for CONTRACTOR’s failure to coordinate work by others.

6.8.2 Coordination Of Work - OWNER, CONTRACTOR and each of such workers, contractors and others shall cooperate to minimize interference.

6.8.3 Cost Of Coordination - CONTRACTOR shall include in its Bid all costs involved as a result of coordinating its WORK with others. CONTRACTOR will not be entitled to additional compensation from OWNER for damages resulting from such simultaneous, collateral and essential work. CONTRACTOR’s sole and exclusive remedy as a third party beneficiary to other prime contracts for damages caused by another contractor will be a direct action against the separate contractor. If necessary to avoid or minimize such damage or delay, CONTRACTOR shall redeploy its work force to other parts of the WORK.

6.8.4 Obligation to Provide Access - CONTRACTOR shall afford each other contractor who is a party to such a direct contract and each utility owner (or OWNER, if OWNER is performing the additional work with OWNER’s employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such work, and shall properly connect and coordinate work performed by others with their WORK as described in these Contract Documents.

6.8.5 CONTRACTOR shall do all cutting, fitting and patching of the WORK that may be required to make its several parts come together properly and integrate with such other work.

6.8.6 CONTRACTOR shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of CONSTRUCTION MANAGER and the others whose work will be affected.

6.9 COORDINATION WITH SUBCONTRACTORS AND SUPPLIERS

6.9.1 CONTRACTOR shall be solely responsible for scheduling and coordinating the WORK of Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the WORK under a direct or indirect contract with CONTRACTOR. CONTRACTOR shall require all Subcontractors, Suppliers and such other persons and organizations performing or furnishing any of the WORK to communicate with CONSTRUCTION MANAGER through CONTRACTOR. All WPRL performed by a Subcontractor or Supplier will be pursuant to an appropriate agreement between CONTRACTOR and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents.

Page 556 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 24

6.9.2 Subcontractor has no contractual relationship with OWNER. Nothing contained in this Article shall create any contractual relationship between any Subcontractor and OWNER or CONSTRUCTION MANAGER, nor relieve CONTRACTOR of any liability or obligation under the Agreement. CONTRACTOR shall include these General Conditions and the Supplementary General Conditions as a part of all its subcontract agreements.

6.9.3 DIVISION OF WORK - The divisions and sections of the Specifications and the identifications of any Drawings shall not control CONTRACTOR in dividing the WORK among Subcontractors or Suppliers or delineating the WORK to be performed by any specific trade.

6.10 PATENT FEES AND ROYALTIES - CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use in the performance of the WORK or the incorporation in the WORK of any invention, design, process, product or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product or device is specified in the Contract Documents for use in the performance of the WORK and if to the actual knowledge of OWNER, or DESIGN CONSULTANT, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by OWNER in the Contract Documents.

6.11 PERMITS - Unless otherwise provided in the Supplementary General Conditions, CONTRACTOR shall obtain and pay for all construction permits and licenses from the agencies having jurisdiction, including the furnishing of insurance and Bonds if required by such agencies.

The enforcement of such requirements under this Agreement shall not be made the basis for claims for additional compensation. OWNER shall assist CONTRACTOR, only when necessary, in obtaining such permits and licenses. CONTRACTOR shall pay all governmental charges and inspection fees necessary for the prosecution of the WORK, which are applicable at the time of opening of Bids. CONTRACTOR shall pay all charges of utility owners for connections to the WORK.

6.12 LAWS AND REGULATIONS - CONTRACTOR shall observe and comply with all Federal, State and local laws, ordinances, Codes, orders and regulations which in any manner affect those engaged or employed on the WORK, the materials used in the WORK or the conduct of the WORK. If any discrepancy or inconsistency should be discovered in this Agreement in relation to any such law, ordinance, code, order or regulation, CONTRACTOR shall immediately report the same in writing to CONSTRUCTION MANAGER.

6.13 TAXES - CONTRACTOR shall pay all sales, consumer, use and other similar taxes required to be paid in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance of the WORK. OWNER is not exempt from sales tax.

6.14 Intentionally Omitted.

6.15 USE OF PREMISES

6.15.1 General - CONTRACTOR shall confine construction equipment, the storage of materials and equipment and the operations of workers to the Project site, the land and areas identified in

Page 557 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 25
and permitted by the Contract Documents and the other land and areas permitted by Laws and Regulations, rights-of-way, permits and easements as approved by CONSTRUCTION MANAGER. CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof or of any land or areas contiguous thereto, resulting from the performance of the WORK. Should any claim be made against OWNER or CONSTRUCTION MANAGER by any such owner or occupant because of the performance of the WORK, CONTRACTOR shall promptly attempt to settle with such other party by agreement or otherwise resolve the claim through litigation.

6.16 PROJECT SITE MAINTENANCE AND INTERFERENCE WITH ADJACENT

PROPERTY

6.16.1 Cost of General Requirements in Contract Price - CONTRACTOR is obligated to comply with the General Requirements. All costs associated with this compliance are to be included in the basic Contract Price.

6.16.2 Vehicle Load Limits - When materials are transported in prosecuting the WORK, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by law or regulation. When it is necessary to cross curbs, sidewalks or drainage facilities CONTRACTOR shall protect them from damage.

6.16.3 Work Outside The Agreement Limits - Despite the designation of Contract Documents or the indication of temporary fences or barricades, the provisions of the Contract Documents governing certain portions of the WORK may require that certain operations be carried out beyond such limits. In those cases, trenching, utility work, site development and landscaping shall be scheduled so as to occasion a minimum of inconvenience or disturbance to or interference with the normal operation of the owner, abutters and the public. CONTRACTOR shall obtain CONSTRUCTION MANAGER’s prior approval and all necessary approvals from other agencies, public entities or the government for such operations, and prosecute such operations expeditiously and restore the premises affected to their original condition immediately upon completion of such operations, unless otherwise specified in the Contract Documents. All existing walks, roadways, paved or landscaped areas on which temporary driveways or walks are rerouted shall be restored to their original condition, immediately upon completion of those phases of the WORK, unless otherwise specified in the Contract Documents. Pumping, draining and control of surface and ground water shall be carried out so as to avoid endangering the WORK or any adjacent facility or property, or interrupting, restricting or otherwise infringing or interfering with its use.

6.16.4 Responsibilities For Damage - All damage, injury or loss to any persons or property caused, directly or indirectly, in whole or in part, by CONTRACTOR, any Subcontractor, Supplier or any other person or organization directly or indirectly employed by any of them to perform or furnish any of the WORK or anyone for whose acts any of them may be liable, shall be remedied by CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of OWNER or CONSTRUCTION MANAGER or DESIGN CONSULTANT). CONTRACTOR’s duties and responsibilities for Safety and for protection of the WORK shall continue until such time as all the WORK is completed and CONSTRUCTION

Page 558 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 26
MANAGER has issued a notice to OWNER and CONTRACTOR in accordance with Article 14 that the WORK is complete.

6.17 CONTRACTOR’S DAILY REPORTS - CONTRACTOR shall complete a daily report indicating his total manpower for each construction trade, major equipment on site, each Subcontractor’s manpower, weather conditions and any other items required by CONSTRUCTION MANAGER. The daily report shall be completed on forms provided by CONSTRUCTION MANAGER and shall be submitted to CONSTRUCTION MANAGER by 9:00 a.m. the following work Day. The report should comment on the daily progress and status of the work within each major component of the WORK. These components will be determined by CONSTRUCTION MANAGER. Submitting acceptable daily reports as required is a precondition to approval of the monthly progress payment. However, these reports are not to be used to meet the notice requirements contained elsewhere in the General Conditions.

6.18 SAFETY

6.18.1 Safety Plan - CONTRACTOR will be required to comply with General Requirements provided by CONSTRUCTION MANAGER. CONTRACTOR shall submit a written Safety plan to CONSTRUCTION MANAGER prior to commencement of any work on site. CONTRACTOR shall be responsible for initiating, maintaining and supervising all Safety precautions and programs in connection with the WORK.

6.18.2 Safety Laws and Regulations - CONTRACTOR shall comply with all applicable Laws and Regulations of any public body having jurisdiction for the Safety of persons or property or to protect them from damage, injury or loss and shall erect and maintain all necessary safeguards for such Safety and protection. CONTRACTOR shall notify owners of adjacent property and of Underground Utilities when prosecution of the WORK may affect them and shall cooperate with them in the protection, removal, relocation and replacement of their property.

6.18.3 Safety Representative - CONTRACTOR shall designate a qualified and experienced Safety representative at the site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of Safety precautions and program. The Safety representative must meet the requirements stated in Supplemental General Conditions 6.18 “Safety.”

6.18.4 Safety Orders - CONTRACTOR shall have at the WORK site as applicable, copies or suitable extracts of: Construction Safety Orders, Tunnel Safety Orders and General Industry Safety Orders issued by the State Division of Industrial Safety. CONTRACTOR shall comply with provisions of these and all other applicable laws, ordinances and regulations.

6.18.5 Trench Shoring Plan - Before excavating any trench five (5) feet or more in depth, CONTRACTOR shall submit to OWNER a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for the workers’ protection from the hazard of caving ground during the excavation of such trench. If the plan varies from the shoring system standards, the plan shall be prepared by a California registered civil construction manager. No excavation shall start until CONSTRUCTION MANAGER has accepted the plan and CONTRACTOR has

Page 559 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 27
obtained a permit from the State Division of Industrial Safety. A copy of the permit shall be submitted to CONSTRUCTION MANAGER and posted at the site.

6.18.6 Use of Explosives - Explosives may be used only when authorized in writing by CONSTRUCTION MANAGER, or as otherwise stated in the Specifications. Explosives shall be handled, used and stored in accordance with all applicable regulations. CONSTRUCTION MANAGER’s approval of the use of explosives shall not relieve CONTRACTOR from liability for claims caused by blasting operations.

6.18.7 Hazardous Communication Program

6.18.7.1 Notification to employees is required when materials that contain hazardous substances or mixtures are required on the WORK. A material safety data sheet as described in section 5194 of the California Code of Regulations shall be requested by CONTRACTOR from the manufacturer of any hazardous product used.

6.18.7.2 Material usage shall be accomplished with strict adherence to California Division of Industrial Safety requirements and all manufacturer’s warnings and application instructions listed on the material safety data sheet and on the product container label.

6.18.7.3 CONTRACTOR shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the site in accordance with laws or regulations, with copies to CONSTRUCTION MANAGER.

6.18.7.4 Unsafe Products - CONTRACTOR shall notify CONSTRUCTION MANAGER if it considers a specified or required product or its intended usage to be unsafe. This notification must be given to CONSTRUCTION MANAGER prior to the product being ordered, or if provided by some other party, prior to the product being used or incorporated in the WORK.

6.18.8 Safety Measures In Bid - Payment for performing all work necessary to provide Safety measures shall be included in the prices bid for other items of work except where separate bid items for excavation Safety are provided.

6.18.9 Safety Reporting

6.18.9.1 Weekly First Aid Logs - This log should be delivered to CONSTRUCTION MANAGER three (3) Days after the weekly reporting period.

6.18.9.2 Accident and Injury Reports - This report should be delivered within twenty-four (24) hours of the injury or accident.

6.18.10 CONSTRUCTION MANAGER Safety Deficiency Report - CONTRACTOR is required to respond to this report within two (2) working Days explaining his corrective action and proposed schedule for this action.

Page 560 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 28

6.19 EMERGENCY - In emergencies affecting the Safety or protection of persons or the WORK or property at or adjacent to the site, CONTRACTOR, without special instruction or authorization from CONSTRUCTION MANAGER, is obligated to act to prevent threatened damage, injury or loss. CONTRACTOR shall give CONSTRUCTION MANAGER prompt written notice if CONTRACTOR believes that any significant changes in the WORK have resulted because of the action taken in response to an emergency. If it is determined by OWNER that a change is required, a change shall be authorized by Change Order.

6.20 SHOP DRAWINGS AND SAMPLES

6.20.1 After checking and verifying all field measurements and after complying with applicable procedures specified in the General Requirements, CONTRACTOR shall submit to CONSTRUCTION MANAGER for DESIGN CONSULTANT’s review all Shop Drawings in accordance with the accepted schedule of Shop Drawings Submittals specified in Bidding Documents section Bid Forms.

6.20.2 CONTRACTOR shall also submit to CONSTRUCTION MANAGER for review all Samples in accordance with the accepted schedule of sample Submittals specified in the General Requirements.

6.20.3 Before submittal of each Shop Drawing or Sample, CONTRACTOR shall have determined and verified all quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers and similar data with respect thereto and reviewed or coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the WORK and the Contract Documents.

6.20.4 CONTRACTOR shall, at his own expense, furnish for review, and obtain approval by the CONSTRUCTION MANAGER, three (3) copies each of detailed submittals for materials, installation drawings, and construction procedures for the following:
 Any material which differ from that specified with a brand name on the Plans and in this Special Provisions
 A.C. Mix Design. The percent bitumen, sieve analysis, durability, resistance (R-value), aggregate gradation and all other standard parameters. The A.C. mix design shall meet the current Caltrans Standard Specifications. Mix Design is to be current within the last two (2) years.
 Crack Filling Materials
 Slurry Seal Materials
 Tack Coat Oil
 Class II Base gradation, durability, R-value, and sand equivalent.  Sand backfill gradation and sand equivalent
 P.C.C. concrete mix design
 Concrete curing compound
 Truncated domes for the ADA compliant ramps
 New signs and sign posts

Page 561 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 29
 Striping Paint, Thermoplastic, reflective beads, pavement markers and other material pertaining to installation of new traffic striping
 Traffic Control Plans, traffic control signs, barricades, cones and devices including all items illustrated on the Traffic Control Plans
 Storm Drain Inlet and associated material
 PVC Pipe
 Grout
 Reinforcing bars
 Sidewalk drain aluminum cover
 Erosion Control BMP items
 Non-traffic pull box
 PVC Conduit
 Public notification flyers
 Manhole Lid and/or material pertaining to the adjustment  Valve Can, Lid and/or material pertaining to the adjustment  Water meter box and/or material pertaining to the adjustment  Utility Vault and/or material pertaining to the adjustment  Monument Well Can, Lid and/or material pertaining to the adjustment  Monument Preservation Certificate (prior to any construction/demolition activities)  Electrical submittal items
 LED Street Light
 Pedestrian Hybrid Beacon System Material and Equipment  Certificate of Compliance
 Project Identity and Construction Signs
 Construction Schedule
 The letter designating the Project Superintendent
In addition, OWNER’s representative may, at his discretion, require shop drawings on other equipment or construction activities not included in the above list. OWNER’s representative shall have ten (10) working days to review and return the shop drawings to CONTRACTOR after receipt of said drawings.

6.21 SUBMITTAL ACCEPTANCE

6.21.1 DESIGN CONSULTANT Review Scope and Limitation - DESIGN CONSULTANT will review and approve Shop Drawings and Samples. DESIGN CONSULTANT’s review and approval will be only to determine if the items covered by the Submittals will, after installation or incorporation in the WORK, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. DESIGN CONSULTANT’s review and approval will not extend to means, methods, techniques, sequences or procedures of construction except where a particular means, method, technique, sequence or procedure of construction is specifically and expressly called for by the Contract Documents or to Safety precautions or programs incident thereto. The

Page 562 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 30
review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. CONTRACTOR shall make corrections required by DESIGN CONSULTANT, and shall return the required number of corrected copies of Shop Drawings and submit as required new Samples for review and approval. CONTRACTOR shall direct specific attention in writing to revisions other than the corrections called for by DESIGN CONSULTANT on previous Submittals.

6.21.2 CONTRACTOR’s Responsibility Not Relieved By Approval - CONSTRUCTION MANAGER’s and DESIGN CONSULTANT’s review and approval of Shop Drawings or Samples shall not relieve CONTRACTOR from responsibility for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called DESIGN CONSULTANT’s attention to each such variation at the time of submission and DESIGN CONSULTANT has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample approval; nor will any approval by DESIGN CONSULTANT relieve CONTRACTOR from responsibility for complying with the requirements of Article 6.

6.22 COMPLIANCE WITH CONSTRUCTION MANAGER ADMINISTRATIVE PROCEDURES - CONTRACTOR is required to comply with all CONSTRUCTION MANAGER administrative procedures including but not limited to daily reports, Requests for Proposal, Safety reporting, notice requirements, payment procedures, submittal processing, attendance at weekly and special meetings and others designated by CONSTRUCTION MANAGER.

6.23 ASSIGNMENT OF CONTRACT - CONTRACTOR shall not assign, sublet, sell, transfer or otherwise dispose of the Contract Documents or any portion thereof, or its right, title or interest therein, or obligations thereunder, without the written consent of OWNER except as imposed by law. If CONTRACTOR violates this provision, the Agreement may be terminated at the option of OWNER. In such event, OWNER shall be relieved of all liability and obligations to CONTRACTOR and to its assignee or transferee growing out of such termination.

6.24 CONTINUING THE WORK DURING DISPUTES

6.24.1 CONTRACTOR shall carry on the WORK and adhere to the progress schedule during all disputes or disagreements with OWNER over any WORK scope, price or time dispute. No work shall be delayed or postponed pending resolution of any disputes or disagreements, except as CONTRACTOR and OWNER may otherwise agree in writing.

6.24.2 If CONTRACTOR and OWNER are unable to reach agreement on Disputed Work, OWNER may direct CONTRACTOR to proceed with the WORK. Payment shall be as later determined by Article 16.

6.25 GENERAL WARRANTY AND GUARANTEE CONTRACTOR is responsible for providing warranty and guarantee in accordance with Article 13.

Page 563 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 31

6.26 INDEMNIFICATION – In addition and complementary to, the Construction Services Agreement and to the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify, defend and hold harmless OWNER, CONSTRUCTION MANAGER, DESIGN CONSULTANT, their consultants, Sub-Consultants and the officers, directors, employees and agents of each and any of them against and from all claims and liability arising under, by reason of or incidentally to the Agreement or any performance of the WORK, but not from the sole gross negligence or willful misconduct of OWNER, CONSTRUCTION MANAGER and/or DESIGN CONSULTANT. Such indemnification by CONTRACTOR shall include but not be limited to the following:

6.26.1 CONTRACTOR Negligence - Liability or claims resulting directly or indirectly from the negligence or carelessness of CONTRACTOR, its employees or agents in the performance of the WORK, or in guarding or maintaining the same, or from any improper materials, implements or appliances used in its construction, or by or on account of any act or omission of CONTRACTOR, its employees or agents;

6.26.2 Claims By CONTRACTOR Employees - Liability or claims arising directly or indirectly from bodily injury, occupational sickness or disease or death of CONTRACTOR’s or Subcontractor’s own employees engaged in the WORK resulting in actions brought by or on behalf of such employees against OWNER, CONSTRUCTION MANAGER and/or DESIGN CONSULTANT;

6.26.3 Violation Of Law - Liability or claims arising directly or indirectly from or based on the violation of any law, ordinance, regulation, order or decree, whether by CONTRACTOR, its employees or agents;

6.26.4 Patent, Copyright Or Secret Process - Liability or claims arising directly or indirectly from the use or manufacture by CONTRACTOR, its employees or agents in the performance of this Agreement of any copyrighted or un-copyrighted composition, secret process, patented or unpatented invention, article or appliance, unless otherwise specifically stipulated in this Contract.

6.26.5 Breach Of Warranty - Liability or claims arising directly or indirectly from the breach of any warranties, whether express or implied, made to OWNER or any other parties by CONTRACTOR, its employees or agents;

6.26.6 Willful Misconduct - Liabilities or claims arising directly or indirectly from the willful misconduct of CONTRACTOR, its employees or agents; and,

6.26.7 CONTRACTOR Reimbursement Of Cost - Liabilities or claims arising directly or indirectly from any breach of the obligations assumed herein by CONTRACTOR, CONTRACTOR shall reimburse OWNER, CONSTRUCTION MANAGER and DESIGN CONSULTANT for all costs and expenses, (including but not limited to fees and charges of engineers, architects and other professionals and court costs including all costs of appeals) incurred by said OWNER, CONSTRUCTION MANAGER and DESIGN CONSULTANT in enforcing the provisions of this Article.

Page 564 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 32

6.26.8 Use Of Premises - Liabilities of claims arising directly or indirectly from the use of the premises by CONTRACTOR, its employees or agents.

6.26.9 No Indemnification Limitation - The indemnification obligation in Article 6 shall not be limited in any way by any limitation of the amount or type of damages, compensation or benefits payable by or for CONTRACTOR or any such Subcontractor or other person or organization under Workers’ Compensation acts, disability benefit acts or other employee benefit acts. However, the indemnification obligations of CONTRACTOR shall not extend to the liability of DESIGN CONSULTANT when caused by the professional negligence, errors or omissions.

6.26.10 OSHA/CalOSHA Citations - CONTRACTOR shall indemnify CONSTRUCTION MANAGER against fines, reasonable attorneys’ fees and defense costs resulting from citations issued to CONSTRUCTION MANAGER by either the Federal, State or local Safety enforcement agencies due to CONTRACTOR’s failure to abide by applicable Safety and health standards.

6.26.11 Survival of Obligations - All representations, indemnifications, warranties and guarantees made in, required by or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive Final Payment, completion and acceptance of the WORK and termination or completion of the Agreement.

ARTICLE 7 -- WORK BY OTHERS AT THE SITE

7.1 OWNER’S RIGHT TO WORK AT SITE - OWNER may perform other work related to the Project at the site by OWNER’s own forces, have other work performed by utility owners, or let other direct contracts which may contain General Conditions similar to these. If the fact that such other work is to be performed was not noted in the Contract Documents, written notice thereof will be given to CONTRACTOR prior to starting any such other work.

7.2 CONTRACTOR REPORT ON DELAYS CAUSED BY OTHERS - If the proper execution or results of any part of CONTRACTOR’s work depends upon the work of any such other contractor or utility owner (or OWNER), CONTRACTOR shall promptly inspect and report to CONSTRUCTION MANAGER in writing any apparent delays, defects or deficiencies in such other work that render it unavailable or unsuitable for such proper execution and results.

CONTRACTOR’s failure to report such delays, defects or deficiencies in writing before commencement of the affected WORK will constitute an acceptance of the other work as fit and proper for integration with CONTRACTOR’s work except for latent defects and deficiencies in the other work.

7.3 DAMAGE TO OTHERS CAUSED BY CONTRACTOR - If CONTRACTOR causes damage to the work, property or person of any other contractor employed by OWNER, or if any claim arising out of CONTRACTOR’s performance of the WORK by any other contractor is made against CONTRACTOR, by OWNER, CONSTRUCTION MANAGER, DESIGN CONSULTANT, any other contractor or any other person, CONTRACTOR shall be responsible to settle and shall promptly attempt to settle and resolve the dispute.

7.4 COORDINATION

Page 565 of 758 ends

07/2026/cdz/A26-0136/ATPCycle6ImprovProj
GC 33

7.4.1 Coordination Responsibilities - CONTRACTOR’s coordination responsibilities are in accordance with those found in Article 6 and in the described Supplementary General Conditions if applicable.

7.4.2 Coordination Delays - Should CONTRACTOR be delayed by OWNER, and such delay could not reasonably have been foreseen and prevented by CONTRACTOR, CONSTRUCTION MANAGER will determine the extent of the delay, the effect of the delay on the work as a whole, and any commensurate extension of time. CONSTRUCTION MANAGER shall arrange meetings with other contractors performing work on behalf of OWNER to plan coordination of construction activities. Any difference or conflict arising between CONTRACTOR and any other contractor employed by OWNER shall be submitted to CONSTRUCTION MANAGER for a decision in the matter. CONTRACTOR shall comply with reasonable direction from CONSTRUCTION MANAGER whose decision on coordination matters will be final.

7.5 Remedy For Delays By Others - By entering into this Agreement, CONTRACTOR acknowledges that there may be other contractors on the site whose WORK will be coordinated with that of his own. CONTRACTOR expressly warrants and agrees that he will cooperate with other contractors and will do nothing to delay, hinder or interfere with the WORK of other separate contractors, OWNER, CONSTRUCTION MANAGER or DESIGN CONSULTANT.

CONTRACTOR also expressly agrees that, in the event his work is hindered, delayed, interfered with or otherwise affected by a separate contractor, his sole remedy will be a direct action against the separate contractor. Except as otherwise provided by law, CONTRACTOR will have no remedy, and hereby expressly waives any remedy, against OWNER and/or CONSTRUCTION MANAGER or DESIGN CONSULTANT on account of delay, hindrance, interference or other event caused by a separate contractor.

7.6 Out Of Sequence Or Accelerated Work - When WORK is performed out of sequence and ahead of Interfacing Work, CONTRACTOR shall be responsible for taking reasonable steps to minimize damage or loss to the WORK which may be caused by others during the performance of their work, including but not limited to furnishing prompt written notice to CONSTRUCTION MANAGER and to the other contractors that WORK has been performed out of sequence and ahead of Interfacing Work.

7.7 NATIONAL LABOR RELATIONS BOARD REQUIREMENTS - CONTRACTOR’s Price shall include all costs associated with complying with any applicable National Labor Relations Board requirements for accessing the Project site.

ARTICLE 8 -- OWNER’S RESPONSIBILITIES

8.1 GENERAL - OWNER has the final authority in all matters affecting the WORK.

8.2 COMMUNICATIONS - In general, OWNER and DESIGN CONSULTANT shall issue all written communications to CONTRACTOR through CONSTRUCTION MANAGER.

8.3 PAYMENTS - OWNER shall make payments to CONTRACTOR as provided in Article 14.

Page 566 of 758 ends
← All documents from this meeting