Cities Index.
Agenda packet

El Cerrito City Council
May 20, 2025

Document
Agenda packet
Meeting
May 20, 2025
Body
El Cerrito City Council
Pages
10
Original file
14.4 MB
Text extracted from the city's file for reading and search. Open the original on elcerritoca.api.civicclerk.com. That file is the official record.

Mayor Councilmembers
Carolyn Wysinger William Ktsanes
Mayor Pro Tem Lisa Motoyama
Gabe Quinto AGENDA Rebecca Saltzman

Page 1 of 5 ends

This information can be interpreted for you free of charge. Visit City Hall at 10890 San Pablo Ave., El Cerrito, CA 94530 or learn more at www.el-cerrito.org/LanguageAccess

Esta información se puede interpretar gratuitamente. Visite el Ayuntamiento en 10890 San Pablo Ave., El Cerrito, CA 94530 o obtenga más información en www.el-cerrito.org/LanguageAccess
这些信息可免费为您解释。请访问位于 10890 San Pablo Ave., El Cerrito, CA 94530 的市政厅,或访问 www.el-cerrito.org/LanguageAccess 了解更多信息

TUESDAY, MAY 20, 2025
REGULAR CITY COUNCIL MEETING (6:00 PM)
Council Chambers - 10890 San Pablo Ave, El Cerrito
Closed Captions Available Via Zoom:
https://us06web.zoom.us/j/85688489748?pwd=YdbaGKs9hdfudyuVa7b4bQVLwJIzK4.1 Meeting ID: 856 8848 9748 Passcode: 891309 Dial in: 1-408-638-0968 View:

1. Cable T.V. Broadcast on KCRT Channel 28

2. Livestream Online at www.el-cerrito.org/CouncilMeetingMaterials Accommodations: In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the City Clerk at 510- 215-4305. Notification 48 hours prior to the meeting will enable the City to make reasonable accommodations. Closed Captions available via zoom.

Conduct: This meeting shall be conducted pursuant to the El Cerrito City Council Rules of Order and Procedure, including adjourning by 11:00 PM unless extended to a specific time determined by a majority of the Council.

Public Comments:

1. In-person by submitting a request to speak to the City Clerk.

2. By Email to [email protected] identified in the subject line as Public Comments – Agenda Item #.

Written comments received by 2:00 p.m. the day of the meeting will be provided to the City Council and posted online in advance of the meeting. Comments received after the deadline will be provided to the City Council and will be posted after the meeting.

Agenda Packet Page 1 of 293
Mayor Councilmembers
Carolyn Wysinger William Ktsanes
Mayor Pro Tem Lisa Motoyama
Gabe Quinto AGENDA Rebecca Saltzman

Page 2 of 5 ends

6:00 PM ROLL CALL – CONVENE REGULAR CITY COUNCIL MEETING

1. CONSIDER AND TAKE ACTION ON ANY REQUEST FROM A

COUNCILMEMBER TO PARTICIPATE IN THE MEETING REMOTELY DUE TO EMERGENCY CIRCUMSTANCES PURSUANT TO AB 2449

2. PLEDGE OF ALLEGIANCE TO THE FLAG OR OBSERVATION OF A

MOMENT OF SILENCE

3. TELECONFERENCE AND PUBLIC COMMENT INSTRUCTIONS

4. COUNCIL/STAFF COMMUNICATIONS
Reports of closed session, commission appointments and informational reports on matters of general interest which are announced by the City Council and staff.

5. ORAL COMMUNICATIONS FROM THE PUBLIC
Remarks are typically limited to 3 minutes per person. The Mayor may reduce the time limit per speaker depending upon the number of speakers and may limit the total time for public comment to facilitate the completion of business on the agenda. Comments regarding non-agenda, presentation and consent calendar items will be heard first.

Comments related to items appearing on the Public Hearing or Policy Matter portions of the Agenda will be heard prior to the City Council taking action on each item.

6. PRESENTATIONS
A. CalPERS Pension Costs Update
Action Proposed: Receive and file an update on the City's pension costs and liabilities from the City's financial advisors.

Contact: Michael Meyer, Vice President, NHA Advisors; Crystal Reams, Finance Director/City Treasurer, Finance Department

7. ADOPTION OF THE CONSENT CALENDAR
All items on the consent calendar shall be acted upon in one motion, unless a member of the City Council or staff request separate consideration.

A. Approval of Minutes
Action Proposed: Approve the City Council Meeting minutes from April 15 and May 6, 2025.

Contact: Holly M. Charléty, City Clerk, City Management Agenda Packet Page 2 of 293
Mayor Councilmembers
Carolyn Wysinger William Ktsanes
Mayor Pro Tem Lisa Motoyama
Gabe Quinto AGENDA Rebecca Saltzman

Page 3 of 5 ends

B. Financial Advisory Board Recommendation
Action Proposed: Receive and file recommendations from the Financial Advisory Board.

Contact: Kimberly White, Chair, Financial Advisory Board; Crystal Reams, Finance Director/Staff Liaison, Finance Department C. LGBTQIA+ Pride Month Proclamation
Action Proposed: Approve a proclamation declaring the month of June as Lesbian, Gay, Bi-Sexual, Transgender/Transsexual,
Queer/Questioning, Intersex and Agender/Asexual (LGBTQIA+) Pride month in the City of El Cerrito and recognize Pride Month by flying the Progress Pride flag at City Hall during the month of June.

Contact: Shannon Bassi, Human Resources Manager, City
Management
D. Recognition of the 5th Anniversary of the Death of George Floyd Proclamation
Action Proposed: At the request of Mayor Wysinger, approve a Proclamation in recognition of the 5th anniversary of the death of George Floyd.

Contact: Holly M. Charléty, City Clerk, City Management E. Monthly Disbursement and Check Register Report for April 2025 Action Proposed: Receive and file the Monthly Disbursement and Check Register Report for the month of April 2025.

Contact: Crystal Reams, Finance Director/City Treasurer, Finance Department
F. Resolution of Support for State and Federal Funding for Bay Area Public Transit
Action Proposed: At the request of Councilmember Saltzman, adopt a resolution supporting state and regional funding for Bay Area public transit.

Contact: Holly M. Charléty, City Clerk, City Management Agenda Packet Page 3 of 293
Mayor Councilmembers
Carolyn Wysinger William Ktsanes
Mayor Pro Tem Lisa Motoyama
Gabe Quinto AGENDA Rebecca Saltzman

Page 4 of 5 ends

G. Acceptance of Transit Oriented Communities (TOC) Grant and related scope of work from the Metropolitan Transportation Commission (MTC)
Action Proposed: Adopt a resolution committing to take steps toward achieving compliance with the Metropolitan Transportation Commission’s (MTC's) Transit-Oriented Communities (TOC) Policy as a condition for MTC to allocate regional discretionary funding.

Contact: Jeff Ballantine, Senior Planner; Sean Moss, Planning Manager; Melanie Mintz, Community Development Director, Community Development Department
H. Approve Spending Authority with SSP Data in an amount not-toexceed $178,000 in Fiscal Year 2024-25 Action Proposed: Adopt a resolution approving spending authority with the vendor SSP Data in an amount not-to-exceed $178,000 in Fiscal Year 2024-25.

Contact: Eric Ng, Information Technology Manager, City Management

8. PUBLIC HEARINGS
A. Annual Public Hearing on Vacancies, Recruitment and Retention Efforts
Action Proposed: Conduct a public hearing to receive and file a report on workforce vacancies, recruitment, and retention efforts in compliance with Assembly Bill 2561.

Contact: Shannon Bassi, Human Resources Manager, City
Management
B. Presentation of 2025 Cost Allocation User Fee Study; and Public Hearing and Approval of Fiscal Year 2025-26 Master Fee Schedule Notice Published 5/10/25 and 5/16/25
Action Proposed: Receive and file a presentation on the 2025 Cost Allocation User Fee study; hold a public hearing and, upon conclusion, adopt a resolution approving the Fiscal Year 2025-26 Master Fee Schedule.

Contact: Crystal Reams, Finance Director/City Treasurer, Finance Department; Tony Thrasher, Principal Consultant, Wildan Agenda Packet Page 4 of 293
Mayor Councilmembers
Carolyn Wysinger William Ktsanes
Mayor Pro Tem Lisa Motoyama
Gabe Quinto AGENDA Rebecca Saltzman

Page 5 of 5 ends

9. POLICY MATTERS
A. Consideration of Fiscal Year 2024-25 One-Time Uses of General Fund Balance
Action Proposed: Consideration and direction on potential one-time expenditures from General Fund balance in Fiscal Year 2024-25.

Contact: Karen Pinkos, City Manager; Crystal Reams, Finance Director/City Treasurer, Finance Department

10. CITY COUNCIL LOCAL & REGIONAL LIAISON ASSIGNMENTS
Mayor and City Council communications regarding local and regional liaison assignments, committee reports, and any required reporting under AB 1234 for meetings (as defined by the Brown Act) attended at the public's expense.

11. ADJOURN REGULAR CITY COUNCIL MEETING
The next regularly scheduled City Council meeting is Tuesday, June 3, 2025 at 6:00 p.m.

The City of El Cerrito serves our diverse community by providing exceptional services that create a safe and resilient future for all.

Agenda Packet Page 5 of 293

CITY OF EL CERRITO

CALPERS PENSION PROGRAM REVIEW AND

COST MANAGEMENT STRATEGY ASSESSMENT
MAY 20, 2025
Agenda Item No. 6.A.

Agenda Packet Page 6 of 293
2 Today’s Discussion
I. Background on CalPERS Costs
II. Historical and Projected CalPERS Costs
III. Cost Management Strategy Overview
IV. Section 115 Pension Trust Analysis
V. Conclusion
Agenda Packet Page 7 of 293

BACKGROUND ON CALPERS COSTS
Agenda Packet Page 8 of 293
4 City of El Cerrito CalPERS Summary
 City of El Cerrito has an $89M CalPERS Unfunded Accrued Liability (“UAL”), as of the latest CalPERS valuation for June 30, 2023
 Miscellaneous Plans: $26M | Safety Plans: $63M
 CalPERS FY 2023-24 Final Investment Returns: 9.5%*
 Projected to decrease City’s UAL to $85M (as of 6/30/2024); annual budgetary impact from this change will be seen in FY 2026-27
 City adopted a Section 115 Pension Trust in September 2023 to address rising pension costs
 $1.4M balance as of March 31, 2025
 Continuing to monitor and manage ongoing CalPERS UAL costs will be critical for fiscal resiliency, especially with potential changes stemming from CalPERS’ FY 2024-25 investment performance and 2025 Asset Liability Management Study *CalPERS’ Money-Weighted Rate of Return, as reported by CalPERS in its FY 2023-24 Annual Comprehensive Financial Report
Agenda Packet Page 9 of 293
5 Background on How CalPERS Works
Two Payments Made to CalPERS Annually
 (1) Normal Cost (“NC”):

Annual cost for current
employees
 (2) Unfunded Accrued
Liability (“UAL”): Annual
payment to amortize the
“debt” to CalPERS
 UAL is amortized over 20 years
 New UAL is created when
CalPERS investment returns
<6.80%
Source: CalPERS Actuarial Valuation as of June 30, 2023 Market Value of
CalPERS Assets:
$164 Million
Accrued Liability:
$253 Million
Shortfall (UAL):
$89 Million
$0
$50
$100
$150
$200
$250
$300
Millions
City of El Cerrito
CalPERS Pension Funded Status
Agenda Packet Page 10 of 293
6 Now…
 Sluggish investment returns (not meeting
assumptions)
 Assumptions have changed/grown more
conservative
 Discount Rate (assumed rate of investment
returns): 8.25% → 7.00% → 6.80%
 Inflation rate (prices going up)
 Mortality rates (people living longer)
 Shorter, more conservative amortizations
Why CalPERS Costs Have Trended Higher
Then (late 1990s)…
 Robust investment returns (10%+)
 Retirement plans were “SuperFunded” through the late 1990s  Earnings on funds were more than
adequate to cover retirement costs
 Super-funded status induced
widespread retirement benefits
enhancements
 Past funding policies led to
contribution holidays and “free”
benefit improvements
Historical PERS
Returns
5-Year: 6.6%
10-Year: 6.2%
20-Year: 6.7%
30-Year: 7.7%
All assumptions will be revisited by CalPERS during
2025 Asset Liability Management (ALM) Study
Agenda Packet Page 11 of 293
7 CalPERS Historical Preliminary Investment Returns (Time-Weighted)*

12.2% 11.9%

18.8%
-2.9%
-23.6%

11.1%

20.7%

1.0%

12.5%

18.4%

2.4%

0.6%

11.2%

8.6%

6.7% 4.7%

21.3%
-6.1%

5.8%

9.3%
-30.0%
-25.0%
-20.0%
-15.0%
-10.0%
-5.0%

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%
2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Annual Return Target Discount Rate
*Preliminary Investment Returns represent the time-weighted rate of return and reflect private market asset valuations as of March 31, 2024. The moneyweighted rate of return, used in the CalPERS ACFR and Valuation Reports may differ from the Preliminary Investment Returns. Source: CalPERS. Agenda Packet Page 12 of 293 8 How CalPERS Benefits Get Funded
 Pre-2008
Investment
earnings used to
make up a higher
percentage of total
contributions
 As investments
underperform
assumptions,
employers must
make up the
difference, unless
the additional costs
are negotiated
with employees
Agenda Packet Page 13 of 293
9 City’s CalPERS Retirement Plans
 2 Main CalPERS plans: Miscellaneous & Safety
 Miscellaneous: 460 covered members; $26M UAL
 Safety: 290 covered members; $63M UAL
 PEPRA (effective 2013) helpful to manage long term pension costs for new employees
 Enacted revised benefit levels for new plan members
 Higher employee contribution rates mean more normal cost is being paid by the employee
 However, 98% of current UAL comes from Classic plans and is not impacted by PEPRA
Agenda Packet Page 14 of 293

HISTORICAL AND PROJECTED CALPERS COSTS
Agenda Packet Page 15 of 293
11 $67 $70 $75
$58
$85 $89 $85

66.2% 66.7%

66.0%

75.2%

65.1% 64.8% 67.7%

0.0%

10.0%

20.0%

30.0%

40.0%

50.0%

60.0%

70.0%

80.0%

90.0%
100.0%
$-
$10
$20
$30
$40
$50
$60
$70
$80
$90
2018 2019 2020 2021 2022 2023 2024
Millions
UAL Funded Ratio
History of the City’s UAL Balance & Funded Ratio
Funded Ratio With and Without Section 115 Trust
CalPERS Returns*: 8.4% 6.5% 5.0% 22.4% -7.5% 6.1% 9.5%
Source: CalPERS Actuarial Valuation Reports & CalPERS Pension Outlook Tool *CalPERS’ Money-Weighted Rate of Return, as reported by CalPERS in its Annual Comprehensive Financial Reports

68.3%
Funded Ratio w/ Trust
Agenda Packet Page 16 of 293
12 $0
$1
$2
$3
$4
$5
$6
$7
$8
$9
$10
$11
20182019202020212022202320242025202620272028202920302031203220332034203520362037203820392040204120422043204420452046 Millions
Historical and Projected UAL Payment Schedule
Projected UAL Payments Based on CalPERS Pension Outlook Tool  City’s UAL payments are
rising due to CalPERS
underperformance
 UAL payment rising to $9.7M
by FY 2031
 35% higher than FY 2025
payment
 UAL is sensitive to CalPERS’
assumption changes and
investment performance
 Discount Rate reduction from

6.8% to 6.5% would increase
UAL balance by $9M and
increase UAL payments by
~$1M (dark blue bars)
UAL Payments*
Additional UAL
Payments (6.5%
Discount Rate)
Source: CalPERS Actuarial Valuation Reports & CalPERS Pension Outlook Tool *Assumes FY 2023-24 investment returns of 9.5% and 6.8% thereafter.

Agenda Packet Page 17 of 293

COST MANAGEMENT STRATEGY OVERVIEW
Agenda Packet Page 18 of 293
14 Pension Cost-Containment Strategies – Not Mutually Exclusive Prepay UAL early in Fiscal Year (≈ 3.3% discount) → CITY DOES THIS Negotiate Cost Sharing With Employees
•New employees already governed by lower cost/benefit PEPRA plans •Negotiated cost sharing of the City’s share
Fresh Start Amortization offered by CalPERS
•Pros: Smooths payment, shortens repayment period; reduces overall interest paid from shorter amortization period •Cons: New structure “locked-in” + increased annual payments in near term; still amortized at discount rate Use Cash Reserves to Pay Extra (two options) → CITY HAS A SECTION 115 PENSION TRUST •Section 115 Trust – Separate trust solely dedicated to pension/OPEB •City’s annual UAL cost and Normal Cost can be supplemented with the Trust •ADP – direct payments to CalPERS to reduce UAL
•Choose optimal amortization bases to pay off
Restructure All or Portion of Remaining UAL
•Restructure portion of UAL at lower bond interest rate and “smooth out” payments for enhanced budget predictability, near and mid-term potential savings, and preservation of cash for other critical projects NOT RECOMMENDED GIVEN CURRENT INTEREST RATES Agenda Packet Page 19 of 293
SECTION 115 PENSION TRUST ANALYSIS
Agenda Packet Page 20 of 293
16 City’s Section 115 Pension Trust
 City has a Section 115 Pension Trust, administered by Public Agency Retirement Services (PARS)
 City’s Section 115 Pension Trust has $1.4M of assets as of March 31, 2025  Moderately Conservative investment strategy: 20-40% Equity | 60-80% Fixed Income  3.54% investment return for the past year (April ‘24 – March ‘25)  Key Considerations for City
 Capacity for additional deposits to the Trust
 Timing and size of withdrawals
 Investment options for assets to earn more interest
Agenda Packet Page 21 of 293
17 $-
$1
$2
$3
$4
$5
$6
$7
$8
$9
$10
20262027202820292030203120322033203420352036203720382039204020412042204320442045 Millions
Section 115 Trust Smoothing Example #1
Additional Deposits for Smoothing
Assumptions:
 CalPERS Discount Rate: 6.8% (no
change)
 CalPERS Investment Returns: 9.5%
in FY 2023-24; 6.8% thereafter
 UAL Balance: $85M
 Beginning Trust Balance: $1.4M
 Total Additional Deposits: $1.5M
 Trust Annual Investment Earnings:

3.50%
 Ending Trust Balance: $0 (FYE 2035)
UAL Payments*
Net Payments
Smoothing Level: $8.9M
Withdrawals from Trust
*Source: CalPERS Pension Outlook Tool
Total Addt’l Deposits:
$1.5M
Agenda Packet Page 22 of 293
18 $-
$1
$2
$3
$4
$5
$6
$7
$8
$9
$10
$11
20262027202820292030203120322033203420352036203720382039204020412042204320442045 Millions
Section 115 Trust Smoothing Example #2 – Discount Rate Reduction

6.5% CalPERS Discount Rate – UAL Increase from $85M to $94M Assumptions:
 CalPERS Discount Rate: 6.5% (vs.
current 6.8%)
 CalPERS Investment Returns: 9.5%
in FY 2023-24; 6.5% thereafter
 UAL Balance: $94M
 Beginning Trust Balance: $1.4M
 Total Additional Deposits: $3.9M
 Trust Annual Investment Earnings:

3.50%
 Ending Trust Balance: $0 (FYE 2035)
UAL Payments*
*Source: CalPERS Pension Outlook Tool
Net Payments
Smoothing Level: $9.3M
Withdrawals from Trust
Total Addt’l Deposits:
$3.9M
Agenda Packet Page 23 of 293
19 Comparison of Section 115 Trust Smoothing Examples
Additional Deposits, Withdrawals, and Net Smoothing Level Example #1 (Additional Deposits) Example #2 (6.5% Discount Rate) Fiscal Year Additional Trust
Deposits
Trust
Withdrawals
Additional Trust
Deposits
Trust
Withdrawals
2026 $866,765 $0 $1,976,422 $0
2027 $460,343 $0 $1,570,000 $0
2028 $140,343 $0 $370,000 $0
2029 $0 $559,657 $0 $979,505
2030 $0 $679,657 $0 $1,099,505
2031 $0 $779,657 $0 $1,199,505
2032 $0 $449,657 $0 $869,505
2033 $0 $409,657 $0 $829,505
2034 $0 $349,657 $0 $769,505
2035 $0 $199,657 $0 $619,505
Total $1,467,451 $3,427,600 $3,916,422 $6,366,534
Net Smoothing Level: $8,890,343 $9,340,495
Agenda Packet Page 24 of 293

CONCLUSION
Agenda Packet Page 25 of 293
21 Conclusion
 City of El Cerrito has recently established a Section 115 Pension Trust to better manage its rising pension costs ($1.4M balance as of 3/31/2025)  14% of City’s 2025 CalPERS costs (UAL + Normal Cost = $10M)  City should stay vigilant to combat the impact of rising pension costs, including an annual review of pension cost projections + ongoing pension cost management strategies
 Annually identify any surplus/reserves that can be added to the Trust and consider higher earning investment portfolios for the Trust assets  Example: Many agencies deposit the savings from the annual UAL prepayment into the Trust  City should reassess pension cost projections once CalPERS reports its FY 2024-25 investment return and finishes its 2025 Asset-Liability Management Study in Fall 2025
Agenda Packet Page 26 of 293
QUESTIONS?
Agenda Packet Page 27 of 293

Page 1 of 6 ends

Agenda Item No. 7.A.

Mayor Councilmembers
Carolyn Wysinger William Ktsanes
Mayor Pro Tem Lisa Motoyama
Gabe Quinto Rebecca Saltzman
This information can be interpreted for you free of charge. Visit City Hall at 10890 San Pablo Ave., El Cerrito, CA 94530 or learn more at www.el-cerrito.org/LanguageAccess Esta información se puede interpretar gratuitamente. Visite el Ayuntamiento en 10890 San Pablo Ave., El Cerrito, CA 94530 o obtenga más información en www.el-cerrito.org/LanguageAccess
这些信息可免费为您解释。请访问位于 10890 San Pablo Ave., El Cerrito, CA 94530 的市政厅,或访问 www.el-cerrito.org/LanguageAccess 了解更多信息

DRAFT MINUTES
TUESDAY, APRIL 15, 2025
View:

1. Cable T.V. Broadcast on KCRT Channel 28

2. Livestream Online at www.el-cerrito.org/CouncilMeetingMaterials Accommodations: In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the City Clerk at 510- 215-4305. Notification 48 hours prior to the meeting will enable the City to make reasonable accommodations. Closed Captions available via zoom.

Conduct: This meeting shall be conducted pursuant to the El Cerrito City Council Rules of Order and Procedure, including adjourning by 11:00 PM unless extended to a specific time determined by a majority of the Council.

Public Comments:

1. In-person by submitting a request to speak to the City Clerk.

2. By Email to [email protected] identified in the subject line as Public Comments – Agenda Item #.

Written comments received by 2:00 p.m. the day of the meeting will be provided to the City Council and posted online in advance of the meeting. Comments received after the deadline will be provided to the City Council and will be posted after the meeting.

REGULAR CITY COUNCIL MEETING (6:00 PM)
City Council Chambers - 10890 San Pablo Ave, El Cerrito Closed Captions available Via Zoom:
https://us06web.zoom.us/j/81395692419?pwd=y6Sq4ElUmbM7dCkIClRbgFHs1BK6Fa.1 Meeting ID: 813 9569 2419 Password: 660211 Dial in: 1-408-638-0968 Agenda Packet Page 28 of 293

Page 2 of 6 ends

6:00 PM ROLL CALL – CONVENE REGULAR CITY COUNCIL MEETING Mayor Wysinger called the meeting to order at 6:11 PM.

Present: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember Saltzman (Arrived at 6:13 PM) Absent: None

1. CONSIDER AND TAKE ACTION ON ANY REQUEST FROM A

COUNCILMEMBER TO PARTICIPATE IN THE MEETING REMOTELY DUE TO EMERGENCY CIRCUMSTANCES PURSUANT TO AB 2449

2. PLEDGE OF ALLEGIANCE TO THE FLAG OR OBSERVATION OF A

MOMENT OF SILENCE

3. TELECONFERENCE AND PUBLIC COMMENT INSTRUCTIONS

4. COUNCIL/STAFF COMMUNICATIONS
Reports of closed session, commission appointments and informational reports on matters of general interest which are announced by the City Council and staff.

City Manager Pinkos - provided an update on the city's network issues.

Councilmember Motoyama - announced upcoming Earth Day activities on 4/9, and the Norman Mineta High School Summer Academy application deadline of 4/27.

Mayor Pro Tem Quinto - reported attendance at a ribbon cutting event for Great Clips in El Cerrito Plaza.

Mayor Wysinger - reported on sending a second letter of support sent for BART's Congressionally Directed Spending request for their LED Lighting Program which includes the El Cerrito Plaza station, attendance at the ribbon cutting for Security Public Storage, and walking YELP representatives through city businesses.

5. ORAL COMMUNICATIONS FROM THE PUBLIC
Remarks are typically limited to 3 minutes per person. The Mayor may reduce the time limit per speaker depending upon the number of speakers and may limit the total time for public comment to facilitate the completion of business on the agenda. Comments regarding non-agenda, presentation and consent calendar items will be heard first.

Comments related to items appearing on the Public Hearing or Policy Matter portions of the Agenda will be heard prior to the City Council taking action on each item.

Public Comments: Written comments submitted prior to and during the meeting are posted online as supplemental materials and incorporated into the official meeting record.

Buddy Akacic - commented on bicycle commuters and public perceptions of the Richmond Street Complete Streets project.

Agenda Packet Page 29 of 293

Page 3 of 6 ends

Elaine Fielding, Shelby Holguin, Inge Brust, Changmo Quan, Clifford Nuzman - spoke in opposition to the Richmond Streets Complete Streets project.

6. PRESENTATIONS

7. ADOPTION OF THE CONSENT CALENDAR
All items on the consent calendar shall be acted upon in one motion, unless a member of the City Council or staff request separate consideration.

Moved/Seconded: Mayor Pro Tem Quinto/Councilmember Motoyama Action:

Approval the consent calendar as indicated below. Ayes: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember Saltzman Noes: None
A. Approval of Minutes
Action Proposed: Approve the City Council Meeting minutes from March 4, 18 and April 1, 2025.

Contact: Holly M. Charléty, City Clerk, City Management Action: Approved Minutes
B. Community Safety Committee Appointments
Action Proposed: Approve Community Safety Committee
recommendations to reappoint William Cedrick Cobb effective April 1, 2025 and appoint Richard Ehara effective April 15, 2025.

Contact: Aaron Leone, Sergeant/CommSC Liaison, Police Department Action: Approved appointments
C. Adopt Landscape and Lighting Assessment (LLAD) for Fiscal Year 2025-26 and Adopt Resolution of Intent to Order Improvements; and Set the Public Hearing as May 06, 2025
Action Proposed: Accept the Engineer's Report specifying assessments for Landscape and Lighting Assessment District No 1988-1 for Fiscal Year 2025-26 and adopt a Resolution of Intention to order improvements pursuant to the Landscape and Lighting Act of 1972, and set the time, date, and place of the public hearing as May 06, 2025 at 6:00 p.m.

Contact: Crystal Reams, Finance Director/City Treasurer, Finance Department
Action: Approved Resolution No. 2025-19
D. Authorization for the West Contra Costa Integrated Waste Management Authority to Enter into New Regional Post-Collection Agreements
Agenda Packet Page 30 of 293

Page 4 of 6 ends

Action Proposed: Adopt a resolution authorizing the West Contra Costa Integrated Waste Management Authority (Authority), also known as RecycleMore, to enter into new regional post-collection agreements and exercise certain related powers pursuant to section 5.4 of the Joint Exercise of Powers Agreement (JEPA) that created the Authority.

Contact: Christina Leard, Management Analyst III; Amelia Timbers, Operations & Environmental Services Division Manager; Yvetteh Ortiz, Public Works Director/City Engineer, Public Works Department Action: Approved Resolution No. 2025-20
E. Approve Professional Services Agreement with CentralSquare Technologies for Permitting and Licensing Software Configuration Action Proposed: Adopt a resolution authorizing the City Manager to approve an agreement with CentralSquare Technologies LLC (CentralSquare) for professional services to configure existing cloudbased permitting and licensing modules to fulfill programmatic needs in the Community Development Department.

Contact: Eric Ng, Information Technology Manager, City Management; Melanie Mintz, Community Development Director
Action: Approved Resolution No. 2025-21
F. Approve an Agreement with Ally Technologies for Nutanix Hyper Converged Infrastructure Software Platform
Action Proposed: Adopt a resolution authorizing the City Manager to execute an agreement with Ally Technologies for Nutanix Hyper Converged Infrastructure (HCI) from Dell in an amount not-to-exceed $144,751.

Contact: Eric Ng, Information Technology Manager, City Management Action: Approved Resolution No. 2025-22

8. PUBLIC HEARINGS
A. Public Nuisance Abatement Hearing for 6327 Conlon Avenue Property Notice posted on 3/26/2025, Notice Published on 4/5/2025 Action Proposed: Conduct a public hearing and upon conclusion adopt a resolution declaring substandard maintenance on private property located at 6327 Conlon Avenue and declaring the property a public nuisance, overriding objections by the property owner and authorizing the City Manager or their designee to abate the public nuisance pursuant to El Cerrito Municipal Code Chapter 8.34, and approve budget authority to perform the abatement.

Contact: Steven Mello, Neighborhood Preservation Program Coordinator; Aissia Ashoori, Housing-Economic Development Manager; Melanie Mintz, Community Development Director
Agenda Packet Page 31 of 293

Page 5 of 6 ends

Presentation and Discussion: Presenters and staff responded to comments and questions raised by members of the council regarding process if the property is sold, and timeline to receive reimbursement from a lien placed on the property.

Public Hearing: Mayor Wysinger opened the public hearing.

Public Comments:

None
Moved/Seconded: Mayor Pro Tem Quinto/Councilmember Motoyama Action: Closed the Public Hearing. Ayes: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember Saltzman Noes: None
Moved/Seconded: Councilmember Motoyama/Councilmember Saltzman Action: Approved Resolution No. 2025-23 Ayes: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember Saltzman Noes: None

9. POLICY MATTERS
A. Fiscal Year 2025-26 Budget Study Session
Action Proposed: Conduct a study session on the Fiscal Year 2025-26 General Fund Budget including:
• Adjustments to Proposed Budget
• One-Time Expenditure Considerations
Contact: Karen Pinkos, City Manager; Will Provost, Assistant to the City Manager, City Management; Crystal Reams, Finance Director/City Treasurer; Claire Coleman, Budget/Financial Services Manager, Finance Department
Presentation and Discussion: Presenters and staff responded to comments and questions raised by members of the council regarding accounting for expected recession, unfunded pension liability and potential study session, general fund balance and restricted amounts, impact of departments with reduced budgets, status of deferred maintenance, preferences on presented materials, revenue impacts if pool was closed to replaster, options for audio video improvements in chambers without a complete overhaul, wildfire hazards in the Hillside Natural Area, and process of rolling forward purchase orders.

Public Comments: Written comments submitted prior to and during the meeting are posted online as supplemental materials and incorporated into the official meeting record.

Agenda Packet Page 32 of 293

Page 6 of 6 ends

Action: General direction provided to staff regarding information to bring back at the next budget discussion.

10. CITY COUNCIL LOCAL & REGIONAL LIAISON ASSIGNMENTS Mayor and City Council communications regarding local and regional liaison assignments, committee reports, and any required reporting under AB 1234 for meetings (as defined by the Brown Act) attended at the public's expense.

Councilmember Motoyama - reported on attendance at the Contra Costa Mayors conference, Association of Bay Area Governments Housing Committee meeting and appointment as Vice Chair, and the Community Seder at Temple Beth Hillel.

Councilmember Saltzman - reported on attendance as US Air Force band performance, and the Community Seder at Temple Beth Hillel.

Councilmember Ktsanes - reported on attendance at the Community Seder at Temple Beth Hillel, the Urban Forest Committee meeting, and announced office hours at El Cerrito National Grocery to meet with constituents.

Mayor Pro Tem Quinto - reported on attendance Bay Area Air District, Marin Clean Energy Technical Committee, Richmond Rotary Club event, and upcoming Cal Cities meetings in Sacramento.

Mayor Wysinger - reported on attendance at the Contra Costa Mayors Conference, Human Relations Commission, and announced joining the Cal Cities Leadership Institute (CCLI).

11. ADJOURN REGULAR CITY COUNCIL MEETING
The next regularly scheduled City Council meeting is Tuesday, May 6, 2025 at 6:00 p.m.

The regular meeting adjourned at 8:29 PM
Carolyn Wysinger, Mayor
This is to certify that the foregoing is a true and correct copy of the minutes of the City Council meeting of April 15, 2025 as approved by the El Cerrito City Council.

Holly M. Charléty, MMC, City Clerk
Agenda Packet Page 33 of 293

Page 1 of 10 ends

Mayor Councilmembers
Carolyn Wysinger William Ktsanes
Mayor Pro Tem Lisa Motoyama
Gabe Quinto Rebecca Saltzman
This information can be interpreted for you free of charge. Visit City Hall at 10890 San Pablo Ave., El Cerrito, CA 94530 or learn more at www.el-cerrito.org/LanguageAccess Esta información se puede interpretar gratuitamente. Visite el Ayuntamiento en 10890 San Pablo Ave., El Cerrito, CA 94530 o obtenga más información en www.el-cerrito.org/LanguageAccess
这些信息可免费为您解释。请访问位于 10890 San Pablo Ave., El Cerrito, CA 94530 的市政厅,或访问 www.el-cerrito.org/LanguageAccess 了解更多信息

DRAFT MINUTES
TUESDAY, MAY 6, 2025
View (Regular Meeting Only):

1. Cable T.V. Broadcast on KCRT Channel 28

2. Livestream Online at www.el-cerrito.org/CouncilMeetingMaterials Accommodations: In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the City Clerk at 510- 215-4305. Notification 48 hours prior to the meeting will enable the City to make reasonable accommodations. Closed Captions available via zoom.

Conduct: This meeting shall be conducted pursuant to the El Cerrito City Council Rules of Order and Procedure, including adjourning by 11:00 PM unless extended to a specific time determined by a majority of the Council.

Public Comments:

1. In-person by submitting a request to speak to the City Clerk.

2. By Email to [email protected] identified in the subject line as Public Comments – Agenda Item #.

Written comments received by 2:00 p.m. the day of the meeting will be provided to the City Council and posted online in advance of the meeting. Comments received after the deadline will be provided to the City Council and will be posted after the meeting.

SPECIAL CITY COUNCIL MEETING (5:00 PM)
Hillside Conference Room - 10890 San Pablo Ave, El Cerrito REGULAR CITY COUNCIL MEETING (6:00 PM)
Council Chambers - 10890 San Pablo Ave, El Cerrito
Closed Captions Available Via Zoom:
https://us06web.zoom.us/j/85681636942?pwd=9yZsJrE3vDLq7a6pt74UqRp5tAPbhT.1 Meeting ID: 856 8163 6942 Password: 050009 Dial in: 1-408-638-0968 Agenda Packet Page 34 of 293

Page 2 of 10 ends

5:00 PM ROLL CALL - CONVENE SPECIAL CITY COUNCIL MEETING Mayor Wysinger called the meeting to order at 5:00 PM.

Present: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember Saltzman Absent:

None

1. CONSIDER AND TAKE ACTION ON ANY REQUEST FROM A

COUNCILMEMBER TO PARTICIPATE IN THE MEETING REMOTELY DUE TO EMERGENCY CIRCUMSTANCES PURSUANT TO AB 2449

2. ORAL COMMUNICATIONS FROM THE PUBLIC
All persons wishing to speak should sign up with the City Clerk. Remarks are typically limited to 3 minutes per person and to items on the special meeting agenda only.

3. CLOSED SESSION CONFERENCE WITH NEGOTIATORS
Pursuant to Government Code Section 54957.6
Agency Designated Representatives: Karen Pinkos, City Manager; Alexandra Orologas, Assistant City Manager; Shannon Bassi, Senior Human Resources Analyst; Glenn Berkheimer, Labor Negotiator; and Sky Woodruff, City Attorney.

Employee Organizations: United Professional Firefighters Local 1230.

Contact: Sky Woodruff, City Attorney, City Management
City Council convened to closed session at 5:01 PM. No reportable action.

4. ADJOURN SPECIAL CITY COUNCIL MEETING
The special meeting adjourned at 5:56 PM
6:00 PM ROLL CALL – CONVENE REGULAR CITY COUNCIL MEETING Mayor Wysinger called the meeting to order at 6:06 PM.

Present: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember
Saltzman Absent: None

1. CONSIDER AND TAKE ACTION ON ANY REQUEST FROM A

COUNCILMEMBER TO PARTICIPATE IN THE MEETING REMOTELY DUE TO EMERGENCY CIRCUMSTANCES PURSUANT TO AB 2449

2. PLEDGE OF ALLEGIANCE TO THE FLAG OR OBSERVATION OF A

MOMENT OF SILENCE

3. TELECONFERENCE AND PUBLIC COMMENT INSTRUCTIONS

4. COUNCIL/STAFF COMMUNICATIONS
Reports of closed session, commission appointments and informational reports on matters of general interest which are announced by the City Council and staff.

City Manager Karen Pinkos - announced that the city is conducting a survey regarding a new library, and DMV is expected to re-open on 5/12.

Agenda Packet Page 35 of 293

Page 3 of 10 ends

Councilmember Saltzman - announced today is All Aboard Transit Day.

Councilmember Motoyama - announced upcoming East Shore Alliance Football Club Fiesta event on 5/24 at Cerrito Vista park.

Councilmember Ktsanes - shared a letter of thanks and gratitude from a resident regarding the service received from the Fire Department on a recent call to her residence.

Mayor Pro Tem Quinto - remarked on the letter of thanks received from the Fire Department.

Mayor Wysinger - reported on signing a letter in support of Community Project Funding for the Hillside Natural Area Fuel Modification project and remarked on challenges with hate speech in schools.

5. ORAL COMMUNICATIONS FROM THE PUBLIC
Remarks are typically limited to 3 minutes per person. The Mayor may reduce the time limit per speaker depending upon the number of speakers and may limit the total time for public comment to facilitate the completion of business on the agenda. Comments regarding non-agenda, presentation and consent calendar items will be heard first.

Comments related to items appearing on the Public Hearing or Policy Matter portions of the Agenda will be heard prior to the City Council taking action on each item.

Public Comments: Written comments submitted prior to and during the meeting are posted online as supplemental materials and incorporated into the official meeting record.

Michael McDougall - commented regarding one-time expenditures for consideration in the next budget.

Janet Byron - shared resources and information for El Cerrito Walk and Roll, thanked those involved for the recent El Cerrito Green Mobility Fair, and announced upcoming events.

Steve Price, Kathleen Wong, Gaia Sonatina - spoke in support of the Richmond Street Complete Streets project.

Ethan Kim - spoke regarding the city's Active Transportation Plan and opposition to the Richmond Street Complete Streets project.

Joe Herbert - spoke in opposition to adoption of the National Police Week Proclamation.

Jacqualine Silva - commented on the flooding of a storm drainage adjacent to her property.

Buddy Akacic - spoke regarding destruction of community Jade garden at the community center.

Agenda Packet Page 36 of 293

Page 4 of 10 ends

6. PRESENTATIONS

7. ADOPTION OF THE CONSENT CALENDAR
All items on the consent calendar shall be acted upon in one motion, unless a member of the City Council or staff request separate consideration.

Moved/Seconded: Mayor Pro Tem Quinto/Councilmember Ktsanes Action: Approved the consent calendar as indicated below. Ayes: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember Saltzman Noes: None
A. Asian American, Native Hawaiian, and Pacific Islander Heritage Month Proclamation
Action Proposed: Approve a proclamation declaring the Month of May 2025 as Asian American, Native Hawaiian, and Pacific Islander Heritage Month in the City of El Cerrito.

Contact: Shannon Bassi, Human Resources Manager, City Management Action: Approved proclamation
B. Jewish American Heritage Month Proclamation
Action Proposed: Approve a proclamation declaring the Month of May 2025 as Jewish American Heritage Month in the City of El Cerrito.

Contact: Shannon Bassi, Human Resources Manager, City Management Action: Approved proclamation
C. National Public Works Week Proclamation
Action Proposed: Approve a proclamation designating May 18 through 24, 2025 as National Public Works Week in El Cerrito and encouraging all residents, businesses, and community organizations to recognize the substantial contributions Public Works personnel make to protect our health, safety, and quality of life.

Contact: Yvetteh Ortiz, Public Works Director/City Engineer, Public Works Department
Action: Approved proclamation
D. Bike to Wherever Day Proclamation
Action Proposed: Approve a proclamation declaring May 15, 2025 as Bike to Wherever Day in the City of El Cerrito.

Contact: Jennifer Bright, Management Assistant, Community Development Department
Action: Approved revised proclamation
E. National Police Week Proclamation
Agenda Packet Page 37 of 293

Page 5 of 10 ends

Action Proposed: Approve a proclamation recognizing May 11 through 17, 2025 as National Police Week in the City of El Cerrito.

Contact: JT Wahrlich, Lieutenant, Police Department
Action: Approved proclamation
F. Affordable Housing Month Proclamation
Action Proposed: Approve a proclamation designating May 2025 as Affordable Housing Month in El Cerrito.

Contact: Aissia Ashoori, Housing-Economic Development Manager, Community Development Department
Action: Approved proclamation
G. Economic Development Committee Appointment
Action Proposed: Approve an Economic Development Committee recommendation to appoint Isaac Mankita.

Contact: Aissia Ashoori, Housing-Economic Development Manager, Community Development Department
Action: Approved appointment
H. Park and Recreation Commission Recommendation
Action Proposed: Receive and file recommendations from the Park and Recreation Commission.

Contact: Troy Tyler, Chair, Park and Recreation Commission; Chris Jones, Recreation Director/Staff Liaison, Recreation Department Action: Received and filed
I. Monthly Disbursement and Check Register Report for March 2025 Action Proposed: Receive and file the Monthly Disbursement and Check Register Report for the month of March 2025.

Contact: Crystal Reams, Finance Director/City Treasurer, Finance Department
Action: Received and filed
J. FY 2024-25 Third Quarter Cash and Investment Report
Action Proposed: Receive and file the City's Third Quarter Cash and Investment Report for the period January 31, 2025 to March 31, 2025.

Contact: Crystal Reams, Finance Director/City Treasurer, Finance Department
Action: Received and filed
Agenda Packet Page 38 of 293

Page 6 of 10 ends

K. Authorization To Enter Into A Purchase Agreement With Glasdon, Inc. For the Purchase of Forty-Three Nexus® 52G Trash Recycling Cans
Action Proposed: Adopt a resolution authorizing the City Manager to enter into a purchase agreement with Glasdon, Inc. for an amount not to exceed $80,000 for the purchase of forty-three Nexus® 52G Trash Recycling Cans to be installed at parks around the City.

Contact: Christina Leard, Management Analyst III; Amelia Timbers, Operations & Environmental Services Division Manager; Yvetteh Ortiz, Public Works Director/City Engineer, Public Works Department Action: Approved Resolution No. 2025-24

8. PUBLIC HEARINGS
A. Annual Review and Renewal of the Military Equipment Ordinance Notice Published on 4/26/2025
Action Proposed: Conduct a public hearing, and upon conclusion, adopt a resolution approving the El Cerrito Police Department Military Equipment Report for 2024 and the Military Equipment Policy, including an updated Equipment Inventory, and renewing Ordinance 2022-01.

Contact: Paul Keith, Chief of Police, El Cerrito Police Department Presentation and Discussion: Presenters and staff responded to comments and questions raised by members of the council regarding circumstances requiring a machine or shotgun, average lifespan of drones, current condition of drones, available grant funding, inclusion of acquired date of equipment in future reporting, use and description of commercial transit van, common uses and data from drones, and data use in connection with Sanctuary City policies.

Public Hearing: Mayor Wysinger opened the public hearing.

Public Comments:

Joe Herbert - questioned spending funds on military equipment and its effects on residents given the current political climate.

Moved/Seconded: Mayor Pro Tem Quinto/Councilmember Motoyama Action: Closed the Public Hearing. Ayes: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember Saltzman Noes: None
Moved/Seconded: Councilmember Motoyama/Councilmember Saltzman Action: Approved Resolution No. 2025-25 Ayes: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember Saltzman Noes: None
Agenda Packet Page 39 of 293

Page 7 of 10 ends

B. Public Hearing to Confirm the Diagram and to Levy the Assessment for Fiscal Year 2025-26 for Landscape and Lighting Assessment District No. 1988-1
Notice Published 4/26/2025
Action Proposed: Conduct a public hearing, and upon conclusion adopt a resolution setting the annual Landscape and Lighting Assessment for Fiscal Year (FY) 2025-26 as $72 per single-family residential parcel, and as noted in the Engineer’s Report for other classes of properties.

Contact: Crystal Reams, Finance Director/City Treasurer, Finance Department; Yvetteh Ortiz, Public Works Director/City Engineer, Public Works Department
Public Hearing: Mayor Wysinger opened the public hearing. No public comments.

Moved/Seconded: Councilmember Motoyama/Councilmember Saltzman Action: Closed the public hearing. Ayes: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember Saltzman Noes: None
Moved/Seconded: Councilmember Saltzman/Councilmember Motoyama Action: Approved Resolution No. 2025-26 Ayes: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember Saltzman Noes: None
C. Public Hearing regarding Fiscal Year 2025-26 Storm Drain Annual Report and method of collecting storm drain fees
Notice Published 4/26/25 & 5/02/25; 2/3 vote required to pass Action Proposed: Conduct a public hearing and upon conclusion adopt a resolution approving the Fiscal Year 2025-26 Storm Drain Annual Report and directing that Storm Drain Fees be collected on the property tax rolls.

Contact: Crystal Reams, Finance Director/Treasurer, Finance Department; Yvetteh Ortiz, Public Works Director/City Engineer, Public Works Department
Presentation and Discussion: Presenters and staff responded to comments and questions raised by members of the council regarding long-term plans to meet needs.

Public Hearing: Mayor Wysinger opened the public hearing. No public comments.

Moved/Seconded: Councilmember Motoyama/Councilmember Ktsanes Action: Closed the public hearing. Ayes: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember Saltzman Noes: None
Agenda Packet Page 40 of 293

Page 8 of 10 ends

Moved/Seconded: Councilmember Ktsanes/Councilmember Motoyama Action: Approved Resolution No. 2025-27 Ayes: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Motoyama, Councilmember Saltzman Noes: None

9. POLICY MATTERS
A. FY 2024-25 Third Quarter General Fund Budget Quarterly Update through March 2025
Action Proposed: Receive and file an update on City General Fund revenues and expenses for FY 2024-25 through March 2025.

Contact: Crystal Reams, Finance Director/City Treasurer, Finance Department
Presentation and Discussion: Presenters and staff responded to comments and questions raised by members of the council regarding the method of reporting quarterly information regarding expected and achieved revenues and spending, and status of reserve levels.

Action: Received and filed
B. Predevelopment Loan with El Cerrito Plaza (ECP) Parcel C East Housing Partners, LP for the El Cerrito Plaza BART Transit-Oriented Development
Action Proposed: Adopt a resolution authorizing the City of El Cerrito to enter into a Predevelopment Loan Agreement (Loan) with El Cerrito Plaza Parcel C East Housing Partners, LP (Developer), for the property located at 6671 Fairmount Avenue, also known as Parcel C East - El Cerrito Plaza BART Transit-Oriented Development (Development) - for predevelopment activities related to the construction of 84 affordable housing units.

Contact: Aissia Ashoori, Housing-Economic Development Manager; Melanie Mintz, Community Development Director, Community Development Department
Councilmember Motoyama recused herself from item 9B and 9C and left the room at 8:05 PM.

Presentation and Discussion: Presenters and staff responded to comments and questions raised by members of the council regarding depletion of the housing asset fund and plans to build it back in the future and impacts of SB79.

Moved/Seconded: Councilmember Saltzman/Mayor Pro Tem Quinto Action: Approved Resolution No. 2025-28 Ayes: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Saltzman Noes: None Absent: Councilmember Motoyama (recused due to potential conflict of interest)
Agenda Packet Page 41 of 293

Page 9 of 10 ends

C. A Resolution Authorizing the Execution of Applicable Agreements for the Affordable Housing Sustainable Communities Program for El Cerrito Plaza, Parcel C East, for Transit-Oriented Development at the El Cerrito Plaza BART Station and submission of an application for Affordable Housing Sustainable Community Program funds as a coapplicant with the Related Companies of California Action Proposed: Adopt a resolution authorizing the City Manager to execute all applicable agreements for the Affordable Housing Sustainable Communities (AHSC) Program as a co-applicant with the Related Companies of California, LLC (Developer), for El Cerrito Plaza Station Transit-Oriented Development (TOD Project) Parcel C East, located at 6617 Fairmount Avenue (Project), to construct 84 affordable housing units and associated multimodal transportation improvements and to submit an application to the AHSC Program as a co-applicant. Contact: Aissia Ashoori, Housing-Economic Development Manager; Jarrett Mullen, Sustainable Transportation Program Manager, Melanie Mintz, Community Development Director; Community Development Department
Presentation and Discussion: Presenters and staff responded to comments and questions raised by members of the council regarding use of funding.

Moved/Seconded: Councilmember Saltzman/Mayor Pro Tem Quinto Action: Approved Resolution No. 2025-29. Ayes: Mayor Wysinger, Mayor Pro Tem Quinto, Councilmember Ktsanes, Councilmember Saltzman Noes: None Absent: Councilmember Motoyama (recused due to potential conflict of interest)

10. CITY COUNCIL LOCAL & REGIONAL LIAISON ASSIGNMENTS
Mayor and City Council communications regarding local and regional liaison assignments, committee reports, and any required reporting under AB 1234 for meetings (as defined by the Brown Act) attended at the public's expense.

Councilmember Motoyama returned to Chambers at 8:33 PM
Councilmember Saltzman - reported on attendance at the Cal Cities Leadership Summit.

Councilmember Motoyama - reported on attendance at East Bay Wildfire Coalition meeting, Association of Bay Area Governments Executive Committee meeting, Cal Cities Lobby Day, and Contra Costa Mayors Conference.

Councilmember Ktsanes - remarked on meetings with residents and continuation of holding office ours to meet with residents.

Mayor Pro Tem Quinto - reported on attendance at the Cal Cities Leadership Summit, Cal Cities Board of Directors Meeting, Community Safety Committee meeting, and upcoming Bay Area District meetings.

Agenda Packet Page 42 of 293

Page 10 of 10 ends

Mayor Wysinger - reported on attendance at Cal Cities East Bay Division meeting, Contra Costa Mayors Conference, and West County Mayors and Supervisors meetings.

11. ADJOURN REGULAR CITY COUNCIL MEETING
The regular meeting adjourned at 8:52 PM
Carolyn Wysinger, Mayor
This is to certify that the foregoing is a true and correct copy of the minutes of the City Council meeting of May 6, 2025 as approved by the El Cerrito City Council.

Holly M. Charléty, MMC, City Clerk
Agenda Packet Page 43 of 293
Agenda Item No. 7.B.

Financial Advisory Board
Date: May 20, 2025
To: El Cerrito City Council
From: Financial Advisory Board
Subject: Receive and File Board Recommendation

ACTION PROPOSED
Receive and file the following recommendations from the Financial Advisory Board.

RECOMMENDATIONS
On April 29, 2025, the Financial Advisory Board adopted the following motions:

1. Regarding the General Fund Budget, the Financial Advisory Board recommends that the City Council:
a. Annually adopt a General Fund Budget that sets aside two percent of the (current) General Fund’s operating expenditures to cover mid-year expenses or one-time needs.

Moved/Second: Vice Chair White/Vice-Chair Carvel Ayes: Chair White; Vice-Chair Carvel; Members Szlatenyi Noes: Member McDougall Absent: None

ASSOCIATED WORKPLAN GOAL(S)/AREA(S) OF RESPONSIBILITY

1. Work Plan Goals

2. El Cerrito Municipal Code 2.04.300 Financial Advisory Board There shall be a financial advisory board consisting of five members who reside in the city and have demonstrated expertise in financial management, accounting, fiscal analysis, computer applications, economic analysis or related skills. The financial advisory board shall have the powers and duties stated below, and such other duties and the council shall decide:

1. To conduct a review and make recommendations on the proposed annual budget and long -term financial plan for the city and all component units to assist the city council in making decisions on major expenditures and revenue sources, and to include a review of city council compensation consistent with county-wide
recommendations included in Contra Costa Grand Jury Report No. 1104;
Agenda Packet Page 44 of 293
Agenda Item No. 7.C.

EL CERRITO CITY COUNCIL PROCLAMATION
Recognizing June as LGBTQIA+ Pride Month in the City of El Cerrito WHEREAS, the City of El Cerrito has a diverse Lesbian, Gay, Bisexual, Transgender/Transsexual, Queer/Questioning, Intersex and Agender/Asexual (LGBTQIA+) community and is committed to supporting visibility, dignity, and equity for all people in the community; and
WHEREAS, many of the residents, students, city employees, and business owners within the City of El Cerrito who contribute to the enrichment of our City are a part of the Lesbian, Gay, Bisexual, Transgender/Transsexual, Queer/Questioning, Intersex and Agender/Asexual community; and
WHEREAS, various advancements have been made with respect to equitable treatment of Lesbian, Gay, Bisexual, Transgender/Transsexual, Queer/Questioning, Intersex and Agender/Asexual persons throughout the nation, but there continues to be some opposition against people from this community and around the world making it important for cities like El Cerrito to stand up and show support for our residents who are affected; and
WHEREAS, several cities across the United States recognize and celebrate June as LGBTQIA+ Pride Month; and
WHEREAS, June has become a symbolic month in which Lesbian, Gay, Bisexual, Transgender/Transsexual, Queer/Questioning, Intersex and Agender/Asexual people and supporters come together in various celebrations of pride; and WHEREAS, the rainbow flag, also known as the LGBTQIA+ pride flag or gay pride flag, has been used since the 1970s as a symbol of Lesbian, Gay, Bisexual, Transgender/Transsexual, Queer/Questioning, Intersex and Agender/Asexual pride and LGBTQIA+ social movements; and
WHEREAS, since 2013 the rainbow flag has been flown at City Hall throughout the month of June to symbolize the City’s celebration of diversity and support for the Lesbian, Gay, Bisexual, Transgender/Transsexual, Queer/Questioning, Intersex and Agender/Asexual community; and
WHEREAS, the Progress Pride Flag was designed in 2018, adding a 5-colored chevron to the LGBTQIA+ Rainbow Flag to place a greater emphasis on inclusion and progression.

NOW THEREFORE, the City Council of the City of El Cerrito does hereby declare the month of June as LGBTQIA+ Pride month in the City of El Cerrito and invites everyone to reflect on ways we all can live and work together with a commitment to mutual respect and understanding, and further, recognizes Pride Month by raising the Progress Pride Flag at City Hall on June 2, 2025 at 4:00 PM, and flying the flag through the month of June.

Dated: May 20, 2025
_______________________
Carolyn Wysinger, Mayor
Agenda Packet Page 45 of 293
Agenda Item No. 7.D
.

EL CERRITO CITY COUNCIL PROCLAMATION
Honoring the Life and Legacy of George Floyd
on the Fifth Anniversary of His Death
WHEREAS, on May 25, 2020, George Perry Floyd, Jr., a beloved father, brother, friend, and community member, was tragically killed in an act of police violence that was witnessed around the world; and
WHEREAS, the horrific circumstances of his death ignited a global outcry for racial justice and police accountability, leading to one of the largest and most sustained movements for civil rights and human dignity in recent history; and WHEREAS, George Floyd’s name has become a rallying cry for equity, justice, and the urgent need to dismantle systemic racism in policing and across every facet of American society; and
WHEREAS, in the five years since his death, communities have mourned, marched, legislated, created, healed, and continued the unrelenting work of imagining and building a world where Black lives are fully valued, protected, and free; and WHEREAS, this City stands in solemn remembrance of George Floyd, and in solidarity with all who have lost loved ones to police violence and racial injustice; and WHEREAS, we reaffirm our city’s ongoing commitment to equity, safety, and community-driven change, and honor the community organizers, advocates, activists, and everyday citizens who carry the legacy of George Floyd through action.

WHEREAS, the federal administration has taken radical actions to eliminate diversity, equity, & inclusion, civil rights legislation and neutralize generations of historical activism to actualize social justice in our nation; and WHEREAS, on May 14, 2025 the El Cerrito Human Relations Commission voted to recommend the City Council support and adopt this proclamation, including flying the Black Lives Matter Flag at City Hall.

NOW THEREFORE, the City Council of the City of El Cerrito, does hereby proclaim May 25, 2025, as “George Floyd Remembrance Day” in the City of El Cerrito and call upon all residents to reflect, to remember, and to recommit themselves to the work of justice, healing, and liberation for all; and further recognize the anniversary by flying the Black Lives Matter flag at City Hall on May 24-25, 2025.

Dated: May 20, 2025
_______________________
Carolyn Wysinger, Mayor
Agenda Packet Page 46 of 293

AGENDA BILL
Agenda Item No. 7.E.

Date: May 20, 2025
To: El Cerrito City Council
From: Crystal Reams, Finance Director/City Treasurer, Finance Department Subject: Monthly Disbursement and Check Register Report for April 2025

ACTION PROPOSED
Receive and file the Monthly Disbursement and Check Register Report for the month of April 2025.

BACKGROUND/ANALYSIS
California Government Code, Title 4. Government of Cities, Division 3, Part 3, Chapter 3, Section 41004 states, “Regularly, at least once each month, the city treasurer shall submit to the city clerk a written report and accounting of all receipts, disbursements, and fund balances. The city treasurer shall file a copy with the legislative body.” In addition, the City’s Comprehensive Financial Policy, Item 5.1 Accounting Standards indicates the City’s accounting and financial reporting systems shall be maintained in conformance with all state and federal laws.
• Month ending April 30, 2025, reflecting 214 Accounts Payable General Warrant Nos. 92736 through 92949, 36 ACH/EFT transactions, and 595 payroll-related checks and EFTs for a grand total of $4,449,843.49.

STRATEGIC PLAN CONSIDERATIONS
The City’s Comprehensive Financial Policy, which includes ensuring policies, procedures, and systems represent best practices in financial management, is aligned with requirements referenced in California Government Code, Title 4, Chapter 3, Section 41004.

This action supports the City’s Strategic Plan Goal(s) of:
• High Performing Organization by ensuring the City maintains a strong financial position and a high-preforming organization where employees feel a sense of inclusion and belonging.

ENVIRONMENTAL CONSIDERATIONS
This section is not applicable to this agenda item.

Agenda Packet Page 47 of 293
Agenda Item No. 7.E.

FINANCIAL CONSIDERATIONS
There is no fiscal impact associated with acceptance of the Monthly Disbursement and Check Register Report.

LEGAL CONSIDERATIONS
This section is not applicable to this agenda item.

Reviewed by:

Karen Pinkos, City Manager
Attachments:

1. Monthly Payment Register April 2025
Agenda Packet Page 48 of 293
Number Date Status Void Reason Reconciled/ Voided DSource Payee Name Description Transaction Amount Check
92736 04/03/2025 Open Accounts Payable VELOCITY LOCK AND KEY KEYS - CUSTODIAL CLOSET $51.27 92737 04/03/2025 Open Accounts Payable 4LEAF, INC. FIRE PLAN REVIEW FEB 2025 $960.00 92738 04/03/2025 Open Accounts Payable ADAMS SAFETY TRAINING STAFF CPR TRAINING 3/15/2025 $1,000.00 92739 04/03/2025 Open Accounts Payable ALAMEDA COUNTY FIRE DEPARTMENT KFD8 REPAIRS $6,106.28 92740 04/03/2025 Open Accounts Payable AVILA PROJECT MANAGEMENT 2025 ACCESS MODIFICATION JAN 2025 $29,109.00 92741 04/03/2025 Open Accounts Payable BERTRAND, FOX, ELLIOT, OSMAN & WENZEL LLP CITY OF EL CERRITO (GENERAL) $13,552.50 92742 04/03/2025 Open Accounts Payable CITY OF LAFAYETTE MAYORS CONFERENCE/ DINNER FOR COUNCILMEMBERS $140.00 92743 04/03/2025 Open Accounts Payable CIVICPLUS, LLC ANNUAL FEE FOR WEBSITE HOSTING SUPPORT & STORAGE $10,404.61 92744 04/03/2025 Open Accounts Payable EHSD-CC SENIOR NUTRITION CAFE COSTA SENIOR LUNCH PROGRAM CONTRIBUTION REIMB FEB 2025 $726.55 92745 04/03/2025 Open Accounts Payable ERGONOMIC SEATING & PRODUCTS INC. ERGO CHAIR $1,199.68 92746 04/03/2025 Open Accounts Payable FIRE INFORMATION SUPPORT SVCS TECH SERVICES OCT-FEB 2025 $2,250.00 92747 04/03/2025 Open Accounts Payable GARDA CL WEST,INC. ARMORED TRANSPORT SVC - APR25 $294.30 92748 04/03/2025 Open Accounts Payable HILLYARD CITYWIDE CUSTODIAL SUPPLIES $56.81 92749 04/03/2025 Open Accounts Payable J & O'S COMMERCIAL TIRE CENTER ALIGNMENT VEHICLE $254.34 92750 04/03/2025 Open Accounts Payable KEL-AIRE SERVICE CALL $340.00 92751 04/03/2025 Open Accounts Payable KENNEDY, GREG, C EMS REVIEW FEB 2025 $2,000.00 92752 04/03/2025 Open Accounts Payable KINSEY, KATHRYNE ANN BRIDGE FEB 2025 $345.00 92753 04/03/2025 Open Accounts Payable MACK5 EL CERRITO CHURCH FACILITY DEC 2024 $2,094.00 92754 04/03/2025 Open Accounts Payable MELBY, RACHEL ART & CULTURE COMMISSION MINI GRANT $1,500.00 92755 04/03/2025 Open Accounts Payable PASTIME HARDWARE STATION SUPPLIES $8.81 92756 04/03/2025 Open Accounts Payable QUINTO, GABRIEL REQUEST FOR PAYMENT - CONFERENCE/TECHNICAL MEETING $98.02 92757 04/03/2025 Open Accounts Payable RECORDS CONTROL SERVICES, INC. RECORDS MANAGEMENT NEEDS ASSESSMENT $2,949.39 92758 04/03/2025 Open Accounts Payable RUIZ, JOE X-FIT YOUTH AND ADULT CLASSES $732.21 92759 04/03/2025 Open Accounts Payable SHABABO, TRACEY, ELISE SEWING + HASEP/MASEP FEB-MAR 2025 $3,393.60 92760 04/03/2025 Open Accounts Payable ZOOM VIDEO COMMUNICATIONS, INC. CITY COUNCIL MEETING (TRANSPARANCY) SERVICES $3,589.93 92761 04/03/2025 Open Accounts Payable GHILOTTI BROS, INC DEL NORTE TOD COMPLETE STREETS IMPROVEMENT $10,000.00 92762 04/03/2025 Open Accounts Payable WADE, THOMAS REIMB. FOR TRANSPORTATION CHARGES $189.06 92763 04/03/2025 Open Accounts Payable WRIGHT, CLAUDIA MILEAGE REIMBURSEMENT $63.42 92764 04/03/2025 Open Accounts Payable WYSINGER, CAROLYN ATTENDING NCL CONGRESSIONAL SUMMIT WASHINGTON DC $443.43 92765 04/03/2025 Open Accounts Payable KAPLAN, JESSICA REAL PROPERTY TAX REBATE FOR 6920 EUREKA AVE $3,000.00 92766 04/03/2025 Open Accounts Payable BECKER , HENRY REQUIRED CERTIFICATE TRAINING COURSE CSROT0094 $850.00 92767 04/03/2025 Open Accounts Payable DRISCOLL, DOMINIC REQUIRED CERTIFICATE TRAINING COURSE $850.00 92768 04/03/2025 Open Accounts Payable AT&T RELEASE OF BONDS - MAR 2025 PART 2 $1,730.00 92769 04/03/2025 Open Accounts Payable BESS TESTLAB, INC. RELEASE OF BONDS - MAR 2025 PART 2 $10,176.00 92770 04/03/2025 Open Accounts Payable CABLECOM RELEASE OF BONDS - MAR 2025 PART 2 $5,730.00 92771 04/03/2025 Open Accounts Payable CHALLENGE ROOTER RELEASE OF BONDS - MAR 2025 PART 2 $1,871.00 92772 04/03/2025 Open Accounts Payable EVEREST PLUMBING & DRAIN RELEASE OF BONDS - MAR 2025 PART 2 $1,871.00 92773 04/03/2025 Open Accounts Payable PG&E RELEASE OF BONDS - MAR 2025 PART 2 $4,285.00 92774 04/03/2025 Open Accounts Payable ERWYN'S PLUMBING RELEASE OF BONDS - MAR 2025 PART 2 $1,871.00 92775 04/03/2025 Open Accounts Payable S & A PACIFIC CONSTRUCTION, LUKAS VERA RELEASE OF BONDS - MAR 2025 PART 2 $823.00 92776 04/03/2025 Open Accounts Payable TRENCHFREE INC RELEASE OF BONDS - MAR 2025 PART 2 $823.00 92777 04/10/2025 Open Accounts Payable 24 HOUR FITNESS USA, LLC GYM MEMEBERSHIP $323.91 92778 04/10/2025 Voided Goods/Services c04/23/2025 Accounts Payable ALAMEDA COUNTY SHERIFF'S OFFICE VOID $162.00 92779 04/10/2025 Open Accounts Payable AMAZON CAPITAL SERVICES, INC. STATION SUPPLIES $719.24 92780 04/10/2025 Open Accounts Payable ARMOUR PETROLEUM SERVICE & EQUIPMENT CORP UST VISUAL INSPECTION ON 3/20/25 $225.00 92781 04/10/2025 Open Accounts Payable AVILA PROJECT MANAGEMENT 2023 MISC STORM DRIAN REPAIRS $2,257.50 92782 04/10/2025 Open Accounts Payable BADGE FRAME, INC. ORGANIZATION CHART $98.00 92783 04/10/2025 Open Accounts Payable BEST EQUIPMENT FIRE EXTINGUISHER SERVICE $519.90 92784 04/10/2025 Open Accounts Payable BLAISDELL'S BUSINESS PRODUCTS STAPLES $128.33 Accounts Payable - Checks
City of El Cerrito
Payment Register
From Payment Date: 4/1/2025 - To Payment Date: 4/30/2025 user: Jill Du Pages: 1 of 6 Tuesday, May 6, 2025
Agenda Packet Page 49 of 293
City of El Cerrito
Payment Register
From Payment Date: 4/1/2025 - To Payment Date: 4/30/2025 92785 04/10/2025 Open Accounts Payable BLUECOSMO FD SATELLITE PHONES 03/01-03/31/25 $133.90 92786 04/10/2025 Open Accounts Payable BROSAS, DONOVAN PER DIEM - SLI MAR 27-MAR 29 2025 $150.00 92787 04/10/2025 Open Accounts Payable CA POLICE CHIEFS ASSOCIATION WLLE REGISTRATION $1,725.00 92788 04/10/2025 Open Accounts Payable CALIFORNIA PUBLIC POLICY GROUP INC. GRANT WRITING & LEGISLATIVE ADVOCACY MAR 2025 $6,500.00 92789 04/10/2025 Open Accounts Payable CALIFORNIA ROOFING CO., INC. FIRE STATION #52 WATER TEST/RESEAL PIPE BOOTS/ CORNERS & LABOR $640.00 92790 04/10/2025 Open Accounts Payable CANN, COLETTE OPEN CERAMICS FRI MAR 2025 $240.00 92791 04/10/2025 Open Accounts Payable CINTAS CORPORATION #054 UNIFORMS UNIFORM ITEMS FOR LAMBERTO $523.64 92792 04/10/2025 Open Accounts Payable CITY OF RICHMOND CAD FEES $141,210.84 92793 04/10/2025 Open Accounts Payable CONCENTRA MEDICAL CENTERS PRE EMPLOYMENT MED EXAM $1,197.00 92794 04/10/2025 Open Accounts Payable CPS HR CONSULTING RECRUITING $2,535.61 92795 04/10/2025 Open Accounts Payable DON'S TIRE SERVICE, INC. R&R TIRE + ALIENMENT INSPECTION $495.65 92796 04/10/2025 Open Accounts Payable DUNNIGAN PSYCHOLOGICAL & THREAT ASSESSMENTS PSYCH EXAM $1,875.00 92797 04/10/2025 Open Accounts Payable FEHR & PEERS EC PLAZA MOBILITY FRAMEWORK $27,163.13 92798 04/10/2025 Open Accounts Payable FLEET MANAGEMENTHOLDINGS, LLC RECYCLING TRUCK R1: HYDRAULIC SYSTEMS: CONTROL VALVE, CYLINDER $3,582.66 92799 04/10/2025 Open Accounts Payable FOLGERGRAPHICS, INC. SPRING NEWS & VIEWS PRINT NEWSLETTER $5,891.35 92800 04/10/2025 Open Accounts Payable FUJIWARA, PATTY OPEN CERAMIC MON EVENING + INTRO THROW $1,256.00 92801 04/10/2025 Open Accounts Payable GABRIEL, BARBARA, A. ADULT BALLET MAR 2025 $600.00 92802 04/10/2025 Open Accounts Payable GRAHAM POLYGRAPH POLYGRAPHS $350.00 92803 04/10/2025 Open Accounts Payable GRAND PRIX CAR WASH CAR WASH $37.98 92804 04/10/2025 Open Accounts Payable HILLTOP FORD KIA CAR#1 STEERING WHEEL $347.08 92805 04/10/2025 Open Accounts Payable HONEY BUCKET PORTA POTTY SERVICE $60.00 92806 04/10/2025 Open Accounts Payable IRON MOUNTAIN OFF-SITE RECORDS STORAGE AND SERVICES $760.14 92807 04/10/2025 Open Accounts Payable J & O'S COMMERCIAL TIRE CENTER ENGINE VALVE STEM $231.71 92808 04/10/2025 Open Accounts Payable JACKSON, DOUGLAS, W. CHESS BASICS MAR 2025 $33.00 92809 04/10/2025 Open Accounts Payable JAFFE, SCOT OPEN CERAMICS MARCH 2025 $374.40 92810 04/10/2025 Open Accounts Payable JONES, HIROMI HATHA YOGA MAR 2025 $1,032.00 92811 04/10/2025 Open Accounts Payable KEL-AIRE CC KITCHEN AIR MAKE UP UNIT REPLACEMENT $4,465.00 92812 04/10/2025 Open Accounts Payable KI RESEARCH INSTITUTE AIKIDO MAR 2025 $324.00 92813 04/10/2025 Open Accounts Payable KINSEY, KATHRYNE ANN BRIDGE MARCH 2025 $308.40 92814 04/10/2025 Open Accounts Payable KNORR SYSTEMS, INC. ACID $2,846.07 92815 04/10/2025 Open Accounts Payable L.N. CURTIS & SONS VEST CARRIER $368.23 92816 04/10/2025 Open Accounts Payable LACK, CHRIS OPEN CERAMICS + INTRO TO HANDBUILDING MAR 2025 $674.40 92817 04/10/2025 Open Accounts Payable LD PRODUCTS COLOR INK/TONER FOR HP PRINTER IN RC OFFICE $396.86 92818 04/10/2025 Open Accounts Payable Municipal Resource Group LLC WVPP PROJECT - FINAL PAYMENT $7,250.00 92819 04/10/2025 Open Accounts Payable NBS PROFESSIONAL SVCS 4/1-6/30/2025 $3,009.44 92820 04/10/2025 Open Accounts Payable ODP BUSINESS SOLUTIONS, LLC SUPPLIES $230.55 92821 04/10/2025 Open Accounts Payable OIL CHANGERS R&R ENG OIL + FILTER $117.63 92822 04/10/2025 Open Accounts Payable S.P. AUTOMOTIVE RECYCLING FLEET SYPPLIES: RETURN HYDRAULIC OIL $145.53 92823 04/10/2025 Open Accounts Payable SAN DIEGO POLICE EQUIPMENT CO. AMMO $10,290.63 92824 04/10/2025 Open Accounts Payable SSD ALARM INSPECTION ACCT#339947 $660.04 92825 04/10/2025 Open Accounts Payable STERICYCLE, INC. MEDICAL WASTE $814.36 92826 04/10/2025 Open Accounts Payable T-MOBILE USA, Inc. INVEST. DATA $2,695.00 92827 04/10/2025 Open Accounts Payable TWO BROTHERS POOL & SPA, INC MARCH SERVICE LIGHTS/PLUMBING $6,295.85 92828 04/10/2025 Open Accounts Payable UNIVERSAL BUILDING SERVICE LIBRARY CUSTODIAL SUPPLIES $478.28 92829 04/10/2025 Open Accounts Payable VERMONT SYSTEMS, INC. VSI COULD HOSTING $1,291.36 92830 04/10/2025 Open Accounts Payable WESTERN STATES OIL COMPANY RENEWABLE DIESEL $15,642.64 92831 04/10/2025 Open Accounts Payable CAPUTO, LAUREN LUNCH -COMMAND OF CRITICAL INCIDENTS $8.00 92832 04/10/2025 Open Accounts Payable JONES, CHRIS REIMBURSEMENT FOR SUPPLIES -CRAB FEED $330.13 92833 04/10/2025 Open Accounts Payable WAHRLICH, JOHN-TRACY LUNCH -COMMAND OF CRITICAL INCIDENTS $8.00 92834 04/10/2025 Open Accounts Payable WENTWORTH, DAVID PER DIEM PAYMENT 03/25-03/28/2025 $150.00 92835 04/10/2025 Open Accounts Payable BECKER , HENRY HOUSING FOR CONFINED SPACE CLASS $485.00 92836 04/10/2025 Open Accounts Payable DADUL, JIGME MILEAGE AND MEAL REIMBURSEMENT 02/03-03/21/25 $1,866.60 user: Jill Du Pages: 2 of 6 Tuesday, May 6, 2025
Agenda Packet Page 50 of 293
City of El Cerrito
Payment Register
From Payment Date: 4/1/2025 - To Payment Date: 4/30/2025 92837 04/10/2025 Open Accounts Payable DADUL, JIGME MILEAGE AND MEAL REIMBURSEMENT 11/25/24-01/31/25 $2,470.50 92838 04/10/2025 Open Accounts Payable STRAITEN, MARK P& E Management Course 03/25-03/28/2025 $150.00 92839 04/10/2025 Open Accounts Payable VERNARECCI, RILEY REIMBURSEMENT FOR TRAINING CLASS 03/10-03/14 $850.00 92840 04/10/2025 Open Accounts Payable AVILA PROJECT MANAGEMENT COMMUNITY CENTER ROOF REPAIRS $3,075.50 92841 04/10/2025 Open Accounts Payable GARDA CL WEST,INC. V0 EXCESS PREMISE TIME $40.15 92842 04/04/2025 Open Accounts Payable CALPERS LONG TERM CARE PROGRAM PER3 - CALPERS Longterm Care Ins $43.62 92843 04/04/2025 Open Accounts Payable HEALTH CARE DENTAL TRUST DEN1 - Dental 1* $18,005.22 92844 04/04/2025 Open Accounts Payable IAFF LOCAL 1230 DUE4 - UNION LOCAL 1230 $5,895.40 92845 04/04/2025 Open Accounts Payable KAISER FOUNDATION HEALTH PLAN K1 - Kaiser 1* $261,811.17 92846 04/04/2025 Open Accounts Payable LEGALSHIELD LEGL - PRE-PAID LEGAL SRVC $153.50 92847 04/04/2025 Open Accounts Payable MUNICIPAL POOLING AUTHORITY MPA - Life Insu. Inv# 920-40372_April 2025 $13,892.32 92848 04/04/2025 Open Accounts Payable NATIONWIDE TRUST COMPANY, FSB FHEA - Fire Health Savings Acct $18,175.00 92849 04/04/2025 Open Accounts Payable SEIU LOCAL 1021 COPE - VOLUNTARY COPE DEDUCTION* $2,159.79 92850 04/04/2025 Open Accounts Payable U.S. BANK - INSTITUTIONAL TRUST - W REGION PAR - PARS - ARS 457* $3,124.20 92851 04/17/2025 Open Accounts Payable GHILOTTI BROS, INC DEL NORTE TOD COMPLETE STREETS IMPROVEMENT $450,288.78 92852 04/17/2025 Open Accounts Payable 2-ELEVEN SHIELDS FD HELMET SHIELDS $715.25 92853 04/17/2025 Open Accounts Payable ALL STAR FIRE EQUIPMENT, INC. ENGINE PARTS $2,090.40 92854 04/17/2025 Open Accounts Payable BMI AUDIT SERVICES, LLC BENEFIT AUDIT - PROGRESS INV $3,776.00 92855 04/17/2025 Open Accounts Payable CARROLL, JAMES BACKGROUND $1,850.00 92856 04/17/2025 Open Accounts Payable CHILDCARE CAREERS, LLC MADERA TEMP $1,677.80 92857 04/17/2025 Open Accounts Payable CITY OF CLAYTON MAYORS CONFERENCE RSVP $70.00 92858 04/17/2025 Open Accounts Payable Cogent Investigations BACKGROUND $2,000.00 92859 04/17/2025 Open Accounts Payable CONTRA COSTA HEALTH SERVICES SWIN CENTER HEALTH PERMIT $2,342.00 92860 04/17/2025 Open Accounts Payable DIPRIMA, LISA FASEP ART SESSION 2 2025 $2,003.40 92861 04/17/2025 Open Accounts Payable EBMUD EBMUD 2/3/25-4/7/25 $5,502.56 92862 04/17/2025 Open Accounts Payable HONEYWELL INTERNATIONAL, INC. FEB 2025 CITY SATELLITE PHONES $225.00 92863 04/17/2025 Open Accounts Payable KEL-AIRE STA 52 MAINTENANCE REPAIR $255.00 92864 04/17/2025 Open Accounts Payable KENNEDY, GREG, C MARCH 2025 EMS REVIEW $2,000.00 92865 04/17/2025 Open Accounts Payable KISTER,SAVIO & REI INC MAP CHECKING PL24-0049 $900.00 92866 04/17/2025 Open Accounts Payable MERCURIO BROS. PRINTING, INC, ASSEMBLY FORMS $103.64 92867 04/17/2025 Open Accounts Payable MITCHELL, BONNIE AQUA ZUMBA MARCH 2025 $345.00 92868 04/17/2025 Open Accounts Payable NORGE CLEANERS DRY CLEANING MAR 2025 $433.05 92869 04/17/2025 Open Accounts Payable ODP BUSINESS SOLUTIONS, LLC SUPPLIES $432.15 92870 04/17/2025 Open Accounts Payable OLIVER'S TOW INC. TWO E352 $889.43 92871 04/17/2025 Open Accounts Payable On Duty Health, PLLC MEDICAL ASSESSMENT - DC $1,200.00 92872 04/17/2025 Open Accounts Payable R.S. HUGHES CO. ANNUAL SCBA TEST $650.00 92873 04/17/2025 Open Accounts Payable RAMOS, STEPHANIE, R ZUMBA MAR 2025 $4,557.60 92874 04/17/2025 Open Accounts Payable RILE, KATHRYN OPEN CERAMIC MON AFTERNOON MARCH 2025 $499.20 92875 04/17/2025 Open Accounts Payable RUIZ, JOE XFIT BOOT CAMP MARCH 2025 $435.60 92876 04/17/2025 Open Accounts Payable SHAHKAR, MEHRAN STRENGTH & BALANCE MAR 2025 $1,188.00 92877 04/17/2025 Open Accounts Payable SSD ALARM COMMUNITY CENTER CENTER MAY 2025 $205.22 92878 04/17/2025 Open Accounts Payable STAPLES OFFICE SUPPLIES $34.38 92879 04/17/2025 Open Accounts Payable STERICYCLE, INC. HAZARDOUS MATERIALS $277.33 92880 04/17/2025 Open Accounts Payable TAYLOR, TESS POETRY HASEP & MASEP S2 FEB-MAR25 $1,070.40 92881 04/17/2025 Open Accounts Payable THREE O'CLOCK ROCK LLC ROCK S2 HASEP MASEP $4,199.00 92882 04/17/2025 Open Accounts Payable UNIVERSAL BUILDING SERVICE BUILDING SUPPLIES $92.32 92883 04/17/2025 Open Accounts Payable BRENDA NAVALLIER - FD PETTY CASH FIRE PETTY CASH REIMBURSEMENT FY24-25 $198.88 92884 04/17/2025 Open Accounts Payable CHAND, NIRAJAN LUNCH -TEENAGE BRAIN COURSE 04/01-04/04/25 $32.00 92885 04/17/2025 Open Accounts Payable PAUL KEITH COMMAND COLLEGE PER DIEM FEB 23-28 2025 $400.00 92886 04/17/2025 Open Accounts Payable FORD, DAVID REFUND - T-MOBILE SIGN PERMIT $616.00 92887 04/17/2025 Open Accounts Payable GROUNDWORKS CALIFORNIA LLC PERMIT REFUND -APPLIED ON 1/13/25 $879.86 92888 04/17/2025 Open Accounts Payable HO, MICHAEL REAL PROPERTY TAX REBATE FOR 330 RAMONA AVE $2,400.00 user: Jill Du Pages: 3 of 6 Tuesday, May 6, 2025
Agenda Packet Page 51 of 293
City of El Cerrito
Payment Register
From Payment Date: 4/1/2025 - To Payment Date: 4/30/2025 92889 04/17/2025 Open Accounts Payable MOTT, SARA REAL PROPERTY TAX REBATE FOR 320 RAMONA AVE $5,660.00 92890 04/23/2025 Open Accounts Payable FJ&I ENGINEERING, INC. ARLINGTON PARK ADA PATH $20,300.00 92891 04/18/2025 Open Accounts Payable CALPERS LONG TERM CARE PROGRAM PER3 - CALPERS Longterm Care Ins $43.62 92892 04/18/2025 Open Accounts Payable EL CERRITO FIRE DEPT MGMT GRP MGT1 - FIRE DEPT MGMT GROUP $50.00 92893 04/18/2025 Open Accounts Payable EL CERRITO PUBLIC SFTY EE MGMT MGT2 - SAFETY EMPLYEE MGMT GROUP $513.00 92894 04/18/2025 Open Accounts Payable FIRE ASSOCIATION DUE2 - FIRE ASSN DUES $525.00 92895 04/18/2025 Open Accounts Payable LIFE INSURANCE OF NORTH AMERICA ACCD - Accidental Death & Dismembermt $52.50 92896 04/18/2025 Open Accounts Payable POLICE ASSN. DUE1 - POLICE ASSN DUES $5,630.93 92897 04/18/2025 Open Accounts Payable PRO FIREFIGHTERS ASSN DUES DUE3 - EC PRO FIREFIGHTERS DUES $300.00 92898 04/18/2025 Open Accounts Payable SEIU LOCAL 1021 COPE - VOLUNTARY COPE DEDUCTION* $1,834.50 92899 04/18/2025 Open Accounts Payable U.S. BANK - INSTITUTIONAL TRUST - W REGION PAR - PARS - ARS 457* $2,302.75 92900 04/24/2025 Open Accounts Payable 4LEAF, INC. PROFESSIONAL SERVICES - STAFFING $85,215.10 92901 04/24/2025 Open Accounts Payable A PLUS TREE, LLC PUBLIC TREE MAINTENANCE SERVICES $30,129.30 92902 04/24/2025 Open Accounts Payable ALERT-ALL PUBLIC EDUCATION $1,097.00 92903 04/24/2025 Open Accounts Payable AMAZON CAPITAL SERVICES, INC. OFFICE EQUIPMENT $103.02 92904 04/24/2025 Open Accounts Payable AT&T FIBER FROM 51 TO RICHMOND 02/25- 03/24/2025 $5,801.20 92905 04/24/2025 Open Accounts Payable BEST EQUIPMENT FIRE EXT. SERVICE $251.07 92906 04/24/2025 Open Accounts Payable CHILDCARE CAREERS, LLC MADERA CHILDCARE TEMPS $759.00 92907 04/24/2025 Open Accounts Payable COLLINS, ROBERT BUSINESS CARDS $105.21 92908 04/24/2025 Open Accounts Payable COREY JOHN MASON 7/4 WORLDONE COORDINATION $1,000.00 92909 04/24/2025 Open Accounts Payable CORODATA SHREDDING INC. SHREDDING SVCS MAR 2025 $239.19 92910 04/24/2025 Open Accounts Payable DATA TICKET, INC. BUILDING & SAFETY FEB 2025 $400.00 92911 04/24/2025 Open Accounts Payable Dixon Resources Unlimited PARKING MANAGEMENT ACTION PLAN $40,308.48 92912 04/24/2025 Open Accounts Payable DON'S TIRE SERVICE, INC. R&R TIRE/ NAIL $1,601.81 92913 04/24/2025 Open Accounts Payable DUNNIGAN PSYCHOLOGICAL & THREAT ASSESSMENTS PSYCH. EXAM $625.00 92914 04/24/2025 Open Accounts Payable EBMUD EBMUD 2/14/25-4/15/25 $2,648.86 92915 04/24/2025 Open Accounts Payable FOLGERGRAPHICS, INC. SUMMER 2025 GUIDE 2 $7,088.02 92916 04/24/2025 Open Accounts Payable FRANKEL, PETER PAVEMENT ART PILOT PROGRAM AWARD $500.00 92917 04/24/2025 Open Accounts Payable HdL Companies CONTRACT SVCS SALES TAX APR-JUN 2024 TAC 7033 $2,098.85 92918 04/24/2025 Open Accounts Payable HONEYWELL INTERNATIONAL, INC. MARCH CITY SATELLITE PHONES $225.00 92919 04/24/2025 Open Accounts Payable KEL-AIRE CANYON TRAIL CLUBHOUSE HVAC PM SERVICE APR 2025 $1,431.50 92920 04/24/2025 Open Accounts Payable KNORR SYSTEMS, INC. CHLORINE $1,909.77 92921 04/24/2025 Open Accounts Payable MCAVOY, IAN OFF THE BLOCK STEMP SPRING BREAK CAMP 2025 $9,150.00 92922 04/24/2025 Open Accounts Payable OIL CHANGERS R&R ENG OIL + FILTER CAR 28 $357.89 92923 04/24/2025 Open Accounts Payable OLIVER'S TOW INC. TOW FORD $460.36 92924 04/24/2025 Open Accounts Payable PASTIME HARDWARE CUSTODIAL - MOUNTING TAPE $15.42 92925 04/24/2025 Open Accounts Payable PAYMENTUS CORPORATION CREDIT CARD PROCESSING FEES FEB 2025 $2,426.89 92926 04/24/2025 Open Accounts Payable PINNACLE PETROLEUM INC UNLEADED FUEL $16,067.82 92927 04/24/2025 Open Accounts Payable R3 CONSULTING GROUP POST-COLLECTION AGREEMENT CONSULT $300.00 92928 04/24/2025 Open Accounts Payable REDWOOD PUBLIC LAW, LLP COMMUNITY DEVELOPMENT (LABOR) 3/11-3/31/25 $27,899.21 92929 04/24/2025 Open Accounts Payable ROADSAFE TRAFFIC SYSTEMS, INC. TRAFFIC SIGNS, ANCHORS, TELESPAR POLES & RIVETS $6,558.39 92930 04/24/2025 Open Accounts Payable RUBICON ENTERPRISES INC MONTHLY LANDSCAPE MAINTENANCE MAR 2025 $40,665.38 92931 04/24/2025 Open Accounts Payable SSD ALARM MADERA CLUBHOUSE ALARM FIRE INSPEC. SVCS #339785 $594.00 92932 04/24/2025 Open Accounts Payable STATE OF CA DEPT OF JUSTICE BACKGROUND MAR 2025 $939.00 92933 04/24/2025 Open Accounts Payable TAHIR DOSSETT BALL2THRIVE JAN FEB 2025 $630.00 92934 04/24/2025 Open Accounts Payable TRB AND ASSOCIATES, INC. PLAN CHECK/ ARCH/ENGINEERING 02/01-02/28/25 $7,237.95 92935 04/24/2025 Open Accounts Payable TRIPEPI SMITH AND ASSOCIATES, INC. COMMUNICATION SUPPORT $3,750.00 92936 04/24/2025 Open Accounts Payable TYLER TECHNOLOGIES ANNUAL SAAS FEE PRORATED 4/1-6/30/25 $1,001.50 92937 04/24/2025 Open Accounts Payable UNIVERSAL BUILDING SERVICE LIBRARY MONTHLY JANITORIAL SVCS MAR 2025 MAINT $1,186.92 92938 04/24/2025 Open Accounts Payable Urban37, Inc. PROFESSIONAL SERVICES -STAFFING $32,220.00 92939 04/24/2025 Open Accounts Payable WILLDAN FINANCIAL SERVICES CITY-WIDE COST ALLOCATION PLAN & COMPREHENSIVE FEE 03-04/2025 $6,827.00 92940 04/24/2025 Open Accounts Payable CAPUTO, LAUREN CAL CHIEFS CONF. PER DIEM MAR 9-12 2025 $150.00 user: Jill Du Pages: 4 of 6 Tuesday, May 6, 2025
Agenda Packet Page 52 of 293
City of El Cerrito
Payment Register
From Payment Date: 4/1/2025 - To Payment Date: 4/30/2025 92941 04/24/2025 Open Accounts Payable CHOUDJA, PATRICK BREACHER CERT. LUNCH MAR 24-28 2025 $48.00 92942 04/24/2025 Open Accounts Payable ELLIOTT, MARIELLE TEENAGE BRAIN COURSE APR 1-4 2025 $32.00 92943 04/24/2025 Open Accounts Payable KATANSKI, ALEXANDER TRAFFIC COLLISION LUNCH APR 7-11 2025 $40.00 92944 04/24/2025 Open Accounts Payable OLIVIERI, MICHAEL LUNCH FOR TRAINING-INNER PERSPECTIVES APR 15-16 2025 $16.00 92945 04/24/2025 Open Accounts Payable RIZZO, JAMES ICI TRAINING PER DIEM 03/31-04/04 & 04/07-04/11 $500.00 92946 04/24/2025 Open Accounts Payable WAHRLICH, JOHN-TRACY PER DIEM CAL CHIEFS CONFERENCE 03/09-3/12 2025 $150.00 92947 04/24/2025 Open Accounts Payable WINTERS, CHRISTOPHER TRAFFIC COLLISION LUNCH APR 7-11 2025 $40.00 92948 04/24/2025 Open Accounts Payable ZHAO, ZITIAN TAC RIFLE LUNCH APR 7-9 2025 $24.00 92949 04/24/2025 Open Accounts Payable ENCINAS-AIKAWA, REANNE DEPOSIT REFUND FOR 3/16/2025 $701.00 TOTAL CHECKS 214 Transactions $1,599,684.21
user: Jill Du Pages: 5 of 6 Tuesday, May 6, 2025
Agenda Packet Page 53 of 293
City of El Cerrito
Payment Register
From Payment Date: 4/1/2025 - To Payment Date: 4/30/2025 3229 04/04/2025 Open Accounts Payable EDD - PAYROLL TAX DEPOSIT CA - CA Tax $44,872.06 3230 04/04/2025 Open Accounts Payable IRS FED - Fed Tax* $185,055.06 3231 04/04/2025 Open Accounts Payable MIssionSquare (name chg 03-2021 formerly ICMA) ICM1 - ICMA-457 #300530 FLAT DOLLAR* $66,709.21 3232 04/04/2025 Open Accounts Payable P E R S PE1% - PERS SEIU* $207,968.61 3233 04/15/2025 Open Accounts Payable CALIFORNIA DEPT OF TAX & FEE ADMIN (CDTFA) REC DEPT SALES & USE TAX Q1 2025 $120.00 3234 04/08/2025 Open Accounts Payable PITNEY BOWES PURCHASE POWER PURCHASE POWER PASTAGE CL PYMT APR25 $1,100.00 3235 04/17/2025 Open Accounts Payable U.S. BANK 2017 SALES TAX REVENUE REFUNDING BOND $3,035.00 3236 04/17/2025 Open Accounts Payable U.S. BANK 2017 COP ADMIN FEE PAYMENT $3,000.00 3237 04/18/2025 Open Accounts Payable PG&E PG&E 3/06/25-04/01/25 $22,976.59 3238 04/22/2025 Open Accounts Payable PG&E PG&E 03/03/25-3/31/25 $32,839.44 3239 04/18/2025 Open Accounts Payable EDD - PAYROLL TAX DEPOSIT CA - CA Tax $41,152.42 3240 04/18/2025 Open Accounts Payable IRS FED - Fed Tax* $170,148.57 3241 04/18/2025 Open Accounts Payable MIssionSquare (name chg 03-2021 formerly ICMA) ICM1 - ICMA-457 #300530 FLAT DOLLAR* $65,348.22 3242 04/18/2025 Open Accounts Payable P E R S PE CM PEPRA - PERS CM PEPRA* $203,253.54 3243 04/24/2025 Open Accounts Payable U.S. BANK 2017 REVENUE BOND DEBT SVC -MAY 2025 $546,250.00 3244 04/23/2025 Open Accounts Payable CalPERS (CA Public Employees' Retirement System) CALPERS REPLACEMENT BENEFIT CONTRIBUTION APR 2025 $924.30 3245 04/29/2025 Open Accounts Payable KS STATEBANK 2023 CHEVROLET TAHOE SPECIAL SERVICE VEHICLES WITH UPFITTING $4,907.41 3246 04/29/2025 Open Accounts Payable STRYKER CORPORATION STRYKER EQUIPMENT/ SVC LEASE AGRMNT APR 2025 $6,308.59 3247 04/28/2025 Open Accounts Payable SUTTER HEALTH PLUS SUTTER HEALTH PLUS - MAY PAYMENT $35,448.40 3248 04/29/2025 Open Accounts Payable U.S. BANK - CORPORATE PAYMENT SYS CALCARD APR 2025 PAYMENT $52,421.49 3249 04/30/2025 Open Accounts Payable FIRST DATA MERCHANT SERVICES INC MERCHANT FEE EXPENSE - MARCH 2025 $914.44 3250 04/30/2025 Open Accounts Payable FIRST DATA MERCHANT SERVICES INC MERCHANT FEE EXPENSE - MARCH 2025 $40.33 3251 04/30/2025 Open Accounts Payable FIRST DATA MERCHANT SERVICES INC MERCHANT FEE EXPENSE - MARCH 2025 $321.63 3252 04/30/2025 Open Accounts Payable FIRST DATA MERCHANT SERVICES INC MERCHANT FEE EXPENSE - MARCH 2025 $110.24 3253 04/30/2025 Open Accounts Payable FIRST DATA MERCHANT SERVICES INC MERCHANT FEE EXPENSE - MARCH 2025 $132.75 3254 04/30/2025 Open Accounts Payable FIRST DATA MERCHANT SERVICES INC MERCHANT FEE EXPENSE - MARCH 2025 $38.39 3255 04/30/2025 Open Accounts Payable FIRST DATA MERCHANT SERVICES INC MERCHANT FEE EXPENSE - MARCH 2025 $38.37 3256 04/30/2025 Open Accounts Payable FIRST DATA MERCHANT SERVICES INC MERCHANT FEE EXPENSE - MARCH 2025 $38.39 3257 04/30/2025 Open Accounts Payable AMEX/AMERICAN EXPRESS MERCHANT FEE EXPENSE - MARCH 2025 $63.84 3258 04/30/2025 Open Accounts Payable CLOVER MERCHANT FEE EXPENSE - MARCH 2025 $23.90 3259 04/30/2025 Open Accounts Payable AUTHORIZE.NET MERCHANT FEE EXPENSE - MARCH 2025 $20.00 3260 04/30/2025 Open Accounts Payable AUTHORIZE.NET MERCHANT FEE EXPENSE - MARCH 2025 $34.70 3261 04/30/2025 Open Accounts Payable CARDCONNECT MERCHANT FEE EXPENSE - MARCH 2025 $7,883.44 3262 04/30/2025 Open Accounts Payable CARDCONNECT MERCHANT FEE EXPENSE - MARCH 2025 $2,245.95 3263 04/30/2025 Open Accounts Payable CARDCONNECT MERCHANT FEE EXPENSE - MARCH 2025 $4,674.92 3264 04/30/2025 Open Accounts Payable MECHANICS BANK MERCHANT FEE EXPENSE - MARCH 2025 $367.06 TOTAL EFT's: 36 Transactions $1,710,787.26
Checks & EFT's Status Count Transaction Amount
Open 249 $3,310,309.47
Voided 1 $162.00
Total 250 $3,310,471.47
All Status Count Transaction Amount
Total Checks 83 $65,814.91
Voided Checks 0 $0.00
Total EFT's 512
Total 595 $1,139,372.02
GRAND TOTAL 845 $4,449,843.49
Accounts Payable EFTs

ACCOUNTS PAYABLE

PAYROLL
$1,073,557.11
user: Jill Du Pages: 6 of 6 Tuesday, May 6, 2025
Agenda Packet Page 54 of 293
Agenda Item No. 7.F.

RESOLUTION 2025-XX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL CERRITO SUPPORTING

STATE AND REGIONAL FUNDING FOR BAY AREA PUBLIC TRANSIT
WHEREAS, the residents and economy of the City of El Cerrito depend on public transit, particularly BART, AC Transit, and East Bay Paratransit; and WHEREAS, our communities are at risk of losing public transit service and suffering fare increases, as a result of the expiration of federal operations funds for transit systems; and WHEREAS, reliable, frequent, affordable, safe and sustainable public transit is essential to the mobility needs of many in our community, including youth, elders, disabled people and those who do not have drivers’ licenses as well as those who simply cannot afford to own and drive an automobile; and
WHEREAS, transit service is fundamental to access for affordable housing and cuts to service combined with increased fare costs impede development of new affordable housing, and WHEREAS, cutting service threatens our efforts to reduce greenhouse gas emissions, while increasing traffic congestion and costs for cash-strapped households; and WHEREAS, major cuts to public transit would cause massive ripple effects for our local economy. Without good quality public transit, fewer customers and employees will be able to access businesses and thousands of low income people will lose their only transportation option; and
WHEREAS, there are 800,000 jobs within a 15-minute walk to a BART station and major cuts to public transit could cause traffic on the Bay Bridge to increase by 72% and cause commutes for key routes connecting the East Bay to San Francisco to increase by up to 10 hours per week; and
WHEREAS, the City of El Cerrito is particularly dependent on BART service, being the smallest city with two BART stations; and
WHEREAS, BART has made significant investments in El Cerrito, with the modernization of El Cerrito del Norte BART, the El Cerrito Plaza BART transit-oriented development project coupled with significant access improvements being planned, and new fare gates installed this year at both stations; and
WHEREAS, California, as a state, has been underfunding transit operations relative to many other states for decades. In 2019, transit agencies in the Bay Area received, on average, less than 16 percent of their operating funding from the state, compared to 21 percent state funding in Chicago, 30 percent in New York City, 44 percent in Boston, and 50 percent in Philadelphia; and
WHEREAS, BART experienced ridership of over 50 million in calendar year 2024, while AC Transit experienced ridership of nearly 40 million for fiscal year 2024; and WHEREAS, BART is facing a budget shortfall of $385M and AC Transit is facing a shortfall of $60 million annually, and both agencies will face drastic service cuts by 2027; and Agenda Packet Page 55 of 293
WHEREAS, State Senator Arreguín, together with Assemblymember Gonzalez, has submitted a budget request to increase public transit funding by $2 billion in the next fiscal year; and
WHEREAS, a bill to authorize a multi-county transit ballot measure, SB 63 (Wiener, Arreguín), has been introduced in the state Legislature this year; and WHEREAS, in order to generate the needed funding on the timeline needed to avert service cuts, that bill must be signed this year, and a measure brought to the voters no later than November 2026.

NOW THEREFORE BE IT RESOLVED, by the City Council of the City of El Cerrito that it hereby supports the vision shared by rider, climate and labor groups of a measure that (1) provides enough funding to preserve and increase transit service levels across the region and distributes the funds equitably and (2) prioritizes funding for transit operations, and does not increase carbon emissions.

BE IT FURTHER RESOLVED that the City Council of the City of El Cerrito urges Senator Jesse Arreguin and Assemblymember Buffy Wicks to champion a bill that achieves that vision in the Legislature this year.

BE IT FURTHER RESOLVED that the City Council of the City of El Cerrito urges Assemblymember Wicks, Senator Arreguín, and their colleagues, as well as Governor Newsom, to support the current $2 billion budget request and further budget actions that significantly increase the state’s support for transit operating needs on a sustainable basis.

BE IT FURTHER RESOLVED that the City Council of the City of El Cerrito urges Senator Jesse Arreguin and Assemblymember Buffy Wicks and Governor Newsom to support budget actions that significantly increase the state’s support for transit operating needs on a sustainable basis.

BE IT FURTHER RESOLVED that this resolution shall become effective immediately upon passage and adoption.

I CERTIFY that at a regular meeting on May 20, 2025 the City Council of the City of El Cerrito passed this Resolution by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

IN WITNESS of this action, I sign this document and affix the corporate seal of the City of El Cerrito on .

APPROVED:

Holly M. Charléty, City Clerk
Carolyn Wysinger, Mayor
Agenda Packet Page 56 of 293

AGENDA BILL
Agenda Item No. 7.G.

Date: May 20, 2025
To: El Cerrito City Council
From: Jeff Ballantine, Senior Planner; Sean Moss, Planning Manager; Melanie Mintz, Community Development Director, Community Development Department
Subject: Acceptance of Transit Oriented Communities (TOC) Grant and related scope of work from the Metropolitan Transportation Commission (MTC)

ACTION PROPOSED
Adopt a resolution committing to take steps toward achieving compliance with the Metropolitan Transportation Commission’s (MTC's) Transit-Oriented Communities (TOC) Policy as a condition for MTC to allocate regional discretionary funding.

BACKGROUND
The Metropolitan Transportation Commission (MTC) is the regional transportation planning and funding agency serving the nine-county San Francisco Bay Area. One Bay Area Grant (OBAG) guides how MTC distributes federal transportation funding from the Federal Highway Administration to projects and programs that improve safety, spur economic development and help the Bay Area meet air quality improvement goals.

Since OBAG’s inception in 2015, the City has received $9.78 million in funding for various transportation infrastructure projects further detailed below.

MTC Resolution 4530 (2022) established the Transit-Oriented Communities (TOC) policy for locations within a half mile of existing and planned major transit stops and stations served by regional rail, commuter rail, light-rail transit, bus rapid transit, and ferries. Future OBAG funding cycles will prioritize investments in transit station areas that are subject to TOC policy to jurisdictions that are compliant with TOC policy. MTC has identified nearly 65 jurisdictions as having areas subject to the TOC Policy.

Transit-Oriented Communities seeks to support the region’s transit investment by creating communities around transit stations and along transit corridors that not only support transit ridership, but that are places where Bay Area residents of all abilities, income levels, and racial and ethnic backgrounds can live, work and access services.

The TOC Policy is rooted in Plan Bay Area 2050 (PBA2050), the region’s Long Range Transportation Plan/Sustainable Communities strategy. (MTC Resolution No. 4530, Revised. 10/25/23)
The TOC Policy incentivizes local jurisdictions to plan and zone for higher residential and commercial densities in areas within one half-mile of existing and planned fixedguideway transit stops and stations to support the region’s transit investments.

Agenda Packet Page 57 of 293
Agenda Item No. 7.G.

The TOC Policy also incentivizes local jurisdictions to adopt policies focused on increasing housing production of all types, particularly affordable housing production, preservation and protection, commercial anti-displacement and stabilization, parking management, and transit station access.

Future One Bay Area Grant (OBAG) funding cycles will prioritize investments in transit station areas that are subject to and compliant with the TOC Policy. To date, El Cerrito has received $9.78 million in OBAG funding for various transportation infrastructure projects, including the following:
• Del Norte BART Station Precise Plan and Complete Streets Improvements • Ohlone Greenway Bike and Pedestrian Improvements
• Repaving stretches of Carlson Boulevard and Central Avenue along with various additional streets in the City
As outlined in the MTC Administrative Guidance: Transit-Oriented Communities Policy (September 2024), the TOC requirements are divided into four sections. These include:

1. Zoning density and intensity requirements for residential and commercial office development

2. Affordable housing production, preservation, and protection policies and commercial stabilization policies

3. Parking management policies

4. Station access and circulation requirements
On September 30, 2024, the MTC announced a Call for Projects for Transit-Oriented Communities (TOC) Planning and Implementation Grants. In response, the City of El Cerrito Community Development Department submitted a grant application to MTC requesting $270,000 for the El Cerrito TOC Areas project to support zoning density and intensity requirements in compliance with TOC. On February 14, 2025 the MTC Planning Committee approved $20 million in grants to local jurisdictions, which included awarding the City of El Cerrito’s request. Prior to funding grants to each jurisdiction, MTC requires the legislative body of each jurisdiction to adopt a resolution committing to take steps toward achieving compliance with MTC's TOC Policy.

ANALYSIS
El Cerrito has two areas that are subject to MTC’s TOC Policy: the areas surrounding the El Cerrito Plaza BART Station and the El Cerrito del Norte BART Station. The El Cerrito TOC Areas project that would be funded by the MTC grant will assist the City in achieving compliance with the TOC zoning density and intensity requirements for residential and commercial office development.

For residential zoning requirements, the TOC Policy applies to all parcels within a half mile of both the El Cerrito Plaza BART Station and the El Cerrito del Norte BART Station that do not have any existing residential units and that are not considered a Housing Opportunity Site in the City’s Housing Element.

Agenda Packet Page 58 of 293
Agenda Item No. 7.G.

The TOC Policy requires zoning amendments such that the average required minimum residential density is 75 dwelling units per acre and the average maximum allowable residential density is 100 units per acre for these sites. This could be achieved either by applying these minimum and maximum densities to every applicable parcel or by increasing the required minimum and maximum for some parcels and reducing it for others such that the required averages are still achieved within a half mile of the stations.

For commercial office zoning requirements, the TOC-compliant zoning amendments will require an average minimum Floor Area Ratio (FAR) of 3.0 and an average allowable maximum FAR of 6.0 for parcels within both the El Cerrito Plaza BART Station TOC and the El Cerrito del Norte BART Station TOC areas that are in zoning districts where commercial office space is a permitted use. This is primarily the areas within a half mile of the BART stations that are within the San Pablo Avenue Specific Plan (SPASP) area.

It is worth noting that despite office being a permitted use in the SPASP area, the City has not received a Planning entitlement application for new office square footage since the adoption of the SPASP in 2014.

In the City’s grant application, staff prioritized tasks where additional assistance is needed. In addition to this effort that will be funded through the MTC grant award, the City will also need to come into compliance with the other TOC sections: affordable housing production, preservation, and protection policies and commercial stabilization policies; parking management policies; and station access and circulation requirements.

In the coming months, MTC intends to hire a law firm to prepare model ordinance updates that jurisdictions can utilize to address the requirements of affordable housing production, preservation, and protection policies and commercial stabilization policies.

City staff intend to evaluate and utilize such model ordinances to address these requirements.

In City staff’s review of the requirements for station access and circulation requirements, it appears that existing City programs and policies already address the requirements of this section. Parking allowed maximums and minimums may also need to be modified to be TOC compliant.

In addition, as City staff continues to evaluate and implement the TOC policy that applies to all station areas, staff will monitor whether the policies will help achieve the City’s goals as articulated in the Housing Element, San Pablo Avenue Specific plan and other documents given the City’s particular geographic and market characteristics. Staff will continue to collaborate with its regional partners and advocate to ensure that the TOC Policy takes into consideration El Cerrito’s particular characteristics and helps achieve housing and economic development goals.

Agenda Packet Page 59 of 293
Agenda Item No. 7.G.

NEXT STEPS
After adoption of the required Resolution staff will continue to work with MTC staff to advance the El Cerrito TOC Areas project. MTC issued a request for proposals (RFP) seeking a separate consultant for each of the seven counties that include jurisdictions selected for TOC grant awards to assist each jurisdiction within each county with their respective awarded projects. The deadline for firms to respond to the RFP is May 21, 2025. City staff will return to City Council this summer with a presentation on the TOC policy requirements and steps the City can take to address these requirements.

STRATEGIC PLAN CONSIDERATIONS
This action supports the City’s Strategic Plan Goal(s) of:
• High Performing Organization by developing financing strategies for capital investments; and
• Livability and Belonging by promote a high quality of life and sense of community for current and future generations; and
• Infrastructure and Amenities by advance climate focused, sustainable infrastructure efforts that have community benefit.

ENVIRONMENTAL CONSIDERATIONS
This resolution committing to take steps toward achieving compliance with the Metropolitan Transportation Commission’s (MTC's) Transit-Oriented Communities (TOC) Policy is not a project pursuant to the California Environmental Quality Act and is therefore not subject to environmental review. The environmental review required for the future zoning amendments is also funded by the TOC Planning and Implementation Grants and will be conducted as part of the development of those amendments.

FINANCIAL CONSIDERATIONS
City staff are not requesting any assistance from the General Fund for this effort. Adoption of this resolution will allow the City to accept up to $270,000 in grant funds from MTC.

LEGAL CONSIDERATIONS
The City Attorney has reviewed the proposed action and has not identified any legal considerations.

Reviewed by:

Karen Pinkos, City Manager
Attachments:

1. Resolution
Agenda Packet Page 60 of 293
RESOLUTION 2025-XX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL CERRITO COMMITTING

TO TAKE STEPS TOWARD ACHIEVING COMPLIANCE WITH THE METROPOLITAN TRANSPORTATION COMMISSION’S (MTC'S) TRANSIT-ORIENTED COMMUNITIES (TOC) POLICY AS A CONDITION FOR MTC TO ALLOCATE REGIONAL

DISCRETIONARY FUNDING TO THE EL CERRITO TOC AREAS PROJECT WHEREAS, the MTC adopted Resolution 4530, the TOC Policy; and WHEREAS, the TOC Policy incentivizes local jurisdictions to plan and zone for higher residential and commercial densities in areas within one half-mile of existing and planned fixed-guideway transit stops and stations to support the region’s transit investments and implement key GHG reduction strategies from Plan Bay Area 2050; and
WHEREAS, incentivizing local jurisdictions to also adopt policies focused on increasing housing production of all types, particularly affordable housing production, preservation and protection, commercial anti-displacement and stabilization, parking management, and transit station access and circulation further supports regional transit investments and Plan Bay Area 2050 implementation; and
WHEREAS, in 2023 MTC identified two Tier 2 transit stations in the City of El Cerrito: the El Cerrito Plaza BART Station and the El Cerrito del Norte BART Station; and
WHEREAS, MTC conditions the allocation of regional discretionary funding for fixed-guideway transit extension projects on compliance with the TOC Policy; and WHEREAS, MTC anticipates that future regional funding, such as the One Bay Area Grant (OBAG) program, will consider compliance with the TOC Policy as part of the prioritization and project selection process starting with OBAG 4, expected in 2026; and
WHEREAS, the TOC Policy establishes different compliance expectations for existing and planned station areas based on the level of transit service; and WHEREAS, the TOC Policy identifies four TOC Policy areas (density, housing affordability, parking, and access/circulation); and
WHEREAS, on September 30, 2024 the MTC announced a Call for Projects for Transit Oriented Communities (TOC) Planning and Implementation Grants, and informed local jurisdictions of a November 22, 2024 deadline for submittals of Applications, as well as grant application guidance and requirements including compliance with the Transit Oriented Communities Policy; and Agenda Packet Page 61 of 293
WHEREAS, that the City of El Cerrito submitted a grant application to MTC for $270,000 for the El Cerrito TOC Areas project regarding density for new residential and commercial office development; in response to the MTC’s Call for TOC Planning and Implementation Projects; and
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of El Cerrito that the City of El Cerrito accepts a grant award from MTC for $270,000 for the El Cerrito TOC Areas project regarding density for new residential and commercial office development; in response to the MTC’s Call for TOC Planning and Implementation Projects.

BE IT FURTHER RESOLVED that the City of El Cerrito commits to completing the associated El Cerrito TOC Areas project work scope(s) following an MTC grant award by applying for these funds.

BE IT FURTHER RESOLVED that the City of El Cerrito intends to adopt relevant plans, policies or zoning updates emerging from the work completed through El Cerrito TOC Areas project grant to comply with the TOC Policy density requirements.

BE IT FURTHER RESOLVED that this resolution shall become effective immediately upon passage and adoption.

I CERTIFY that at a regular meeting on May 20, 2025 the City Council of the City of El Cerrito passed this Resolution by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

IN WITNESS of this action, I sign this document and affix the corporate seal of the City of El Cerrito on .
________________________
Holly M. Charléty, City Clerk
APPROVED:
________________________
Carolyn Wysinger, Mayor
Agenda Packet Page 62 of 293

AGENDA BILL
Agenda Item No. 7.H.

Date: May 20, 2025
To: El Cerrito City Council
From: Eric Ng, Information Technology Manager, City Management Subject: Approve Spending Authority with SSP Data in an amount not-to-exceed $178,000 in Fiscal Year 2024-25

ACTION PROPOSED
Adopt a resolution approving spending authority with the vendor SSP Data in an amount not-to-exceed $178,000 in Fiscal Year 2024-25.

BACKGROUND/ANALYSIS
SSP Data has been providing network design and computer security consulting services to the City since 2006. They are one of very few network and security consulting vendors in Northern California and stand out based on their expertise, high level of service, and rapid response to City emergencies. This minimizes system downtime and maximizes the City’s ability to provide all City services and programs to the public.

The City Council previously authorized a payment of $97,771.50 in Fiscal Year (FY) 2024-25 to SSP Data to cover the second annual payment for the AI-powered DarkTrace security detection and response system utilized by the City with approval of Resolution 2023-54 adopted by the City Council on July 18, 2023.

The City is now seeking additional spending authority of $80,228.50 for a not-to-exceed amount of $178,000 with SSP Data in Fiscal Year 2024-25. This spending authority will fund important and needed network and security services for the City, including:
• Completing the renewal of the Sophos Managed Detection and Response system, an existing endpoint protection service provided by SSP Data, for a term ending in 2027 at a cost of $58,075.00.
• Upgrading the aging firewall at the Community Center including maintenance, support, and advanced security features for a term of three years at a cost of $13,677.57.
• Engaging SSP Data to complete additional network and computer consulting services identified as high-priority efforts for FY 2024-25, at a cost of $4,920.00, with an additional $3,555.93 as contingency based on completing tasks relating to increased security features and processes following the City’s recent cybersecurity incident.

In total, expenses with SSP Data for the Darktrace security detection and response system, the Sophos endpoint protection service, refreshing the old firewall at the Community Center, as well as engaging SSP Data for related network design and Agenda Packet Page 63 of 293
Agenda Item No. 7.H.
computer security consulting services are anticipated to total an amount not-to-exceed $178,000 in FY 2024-25. While funds for these purchases are already available in the Adopted Budget, consistent with the City's Procurement Policy, staff are seeking approval to make these purchases, not-to-exceed $178,000 in total throughout the fiscal year.

STRATEGIC PLAN CONSIDERATIONS
This action supports the City’s Strategic Plan Goal(s) of:
• High Performing Organization; and
• Community Safety; and
• Infrastructure and Amenities

ENVIRONMENTAL CONSIDERATIONS
This section is not applicable to this agenda item.

FINANCIAL CONSIDERATIONS
While the City Council previously authorized an expenditure of $97,771.50 with SSP Data in this Fiscal Year, additional authority is needed to complete the full scope of services identified for FY 2024-25 which will include some services through 2027. The total anticipated expenditures, not-to-exceed $178,000, were included within the FY 2024-25 Budget adopted by the City Council on June 18, 2024. As such, there is no additional fiscal impact from adopting this resolution.

LEGAL CONSIDERATIONS
The City Attorney has reviewed the proposed action and found that legal considerations have been addressed.

Reviewed by:

Karen Pinkos, City Manager
Attachments:

1. Resolution

2. SSP Quote 1 Consulting

3. SSP Quote 2 Sophos MDR Safety

4. SSP Quote 3 Sophos MDR Admin

5. SSP Quote 4 CC Firewall
Agenda Packet Page 64 of 293
RESOLUTION 2025-XX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL CERRITO APPROVING SPENDING AUTHORITY WITH SSP DATA NOT-TO-EXCEED $178,000 IN FISCAL YEAR 2024-25
WHEREAS, SSP Data has been providing network design and computer security consulting services to the City since 2006; and
WHEREAS, SSP Data is one of very few network and security consulting vendors in Northern California that stands out because of their expertise, high level of service, and rapid response to emergencies, minimizing system downtime for the City; and WHEREAS, the City Council previously authorized a payment of $97,771.50 in Fiscal Year (FY) 2024-25 to SSP Data to cover the second annual payment for the AIpowered DarkTrace security detection and response system utilized by the City with approval of Resolution 2023-54 adopted by the City Council on July 18, 2023; and WHEREAS, based on the City’s desire to also continue using a Sophos endpoint protection service provided by SSP Data, the need to upgrade the aging firewall at the Community Center, and the desire to engage SSP Data for ongoing network design and computer consulting services provided by the firm, the total expenditure for services from SSP Data in FY 2024-25 are anticipated to total an amount not-to-exceed $178,000; and WHEREAS, the City’s procurement policy and Resolution 2017-71A requires that all purchases totaling over $45,000 with a single vendor in a single fiscal year receive City Council approval; and
WHEREAS, while the City Council previously authorized an expenditure of $97,771.50 in this Fiscal Year, additional authority is needed to complete the full scope of services identified for FY 2024-25; and
WHEREAS, all funding for these services was included in the City Council-adopted budget for FY 2024-25 and therefore no additional appropriation authority is needed.

NOW THEREFORE, BE IT RESOLVED by the City Council of the City of El Cerrito that it hereby authorizes entering into agreements with SSP Data not-to-exceed $178,000 in FY 2024-25.

BE IT FURTHER RESOLVED that this resolution shall become effective immediately upon passage and adoption.

I CERTIFY that at a regular meeting on May 20, 2025, the City Council of the City of El Cerrito passed this Resolution by the following vote:

Agenda Packet Page 65 of 293
AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

IN WITNESS of this action, I sign this document and affix the corporate seal of the City of El Cerrito on .
________________________
Holly M. Charléty, City Clerk
APPROVED:
________________________
Carolyn Wysinger, Mayor
Agenda Packet Page 66 of 293
Quote # SSPQ14433
Quote Date: 4/21/2025
Prepared by: Jennifer Inouye
Prepared for: Eric Ng
Phone # (510) 215-4300
Sold To: C Ship To: ity of El Cerrito City of El Cerrito Eric Ng Eric Ng
10890 San Pablo Avenue 10890 San Pablo Avenue
El Cerrito, CA 94530
United States El Cerrito CA 94530
Ln # Qty Part Number Description Unit Price Ext. Price
1 SSP Data Services - Remote or Onsite
Fiscal year 2024/2025
2 24 SERVICES:Network SSP Network Engineer 2 (M-F 7:00AM - 7:00PM) $205.00 $4,920.00 General IT Services and security to include consult, architect, configure, deploy and troubleshoot.

To include assistance with MFA set up for GlobalProtect; new policies for Global Protect Hardening
internal ticket# 12191 for 3.5 hours already used early April.

SubTotal $4,920.00
Sales Tax $0.00
Shipping $0.00
Total $4,920.00
Professional Services Terms and conditions
* Quote valid for 30 days - acceptance based on credit approval * Purchase Order must include: end user name, street address, email address and phone number for updates. * Prices quoted do not include applicable shipping
Customer Authorized Signature Date
Customer Name and Title PO Number
1304 South 51st Street, Richmond CA 94804 http://www.ssp.com Voice / Fax - 510-215-3423 1 of 1
Agenda Packet Page 67 of 293
Quote # SSPQ13943-01
Prepared by: Chelsey Ortiz
Prepared for: Eric Ng
Phone #
Date: 12/9/2024
Sold To: City of El Cerrito Ship To: City of El Cerrito Eric Ng Eric Ng
10890 San Pablo Avenue
El Cerrito, CA 94530
United States
10890 San Pablo Ave
El Cerrito, CA 94530-2321
United States
Ln # Qty Description Part Number Unit Price Ext. Price
1 70 Central Managed Detection and Response Complete $316.00 $22,120.00 Term Dates: 12/17/2024 - 12/16/2027
Agreement number: L0005856348
MDRCEU36AERGAA
2 11 Central Managed Detection and Response Complete $427.00 $4,697.00 Server Term Dates: 03/24/2025 - 12/16/2027
Agreement number: L0013751184
MDRCSS33BCRGAA
SubTotal $26,817.00
Sales Tax $0.00
Shipping TBD
Total $26,817.00
Terms and conditions
* Quote valid for 30 days - acceptance based on credit approval * Purchase Order must include: end user name, street address, email address and phone number for updates. * Prices quoted do not include applicable shipping
* Any invoice paid with a credit card will be charged a 3.5% convenience fee Customer Authorized Signature Date
Customer Name and Title PO Number
Phone - 510-215-3423
Fax - 510-412-4343
1304 South 51st Street, Richmond CA 94804 www.ssp.com
1 of 1
Agenda Packet Page 68 of 293
Quote # SSPQ14069
Prepared by: Chelsey Ortiz
Prepared for: Eric Ng
Phone #
Date: 12/9/2024
Sold To: City of El Cerrito Ship To: City of El Cerrito Eric Ng Eric Ng
10890 San Pablo Avenue
El Cerrito, CA 94530
United States
10890 San Pablo Ave
El Cerrito, CA 94530-2321
United States
Ln # Qty Description Part Number Unit Price Ext. Price
1 80 Central Managed Detection and Response Complete $316.00 $25,280.00 Term Dates: 12/17/2024 - 12/16/2027
Agreement number: L0005856348
MDRCEU36AERGAA
2 14 Central Managed Detection and Response Complete $427.00 $5,978.00 Server Term Dates: 03/24/2025 - 12/16/2027
Agreement number: L0013751184
MDRCSS33BCRGAA
SubTotal $31,258.00
Sales Tax $0.00
Shipping TBD
Total $31,258.00
Terms and conditions
* Quote valid for 30 days - acceptance based on credit approval * Purchase Order must include: end user name, street address, email address and phone number for updates. * Prices quoted do not include applicable shipping
* Any invoice paid with a credit card will be charged a 3.5% convenience fee Customer Authorized Signature Date
Customer Name and Title PO Number
Phone - 510-215-3423
Fax - 510-412-4343
1304 South 51st Street, Richmond CA 94804 www.ssp.com
1 of 1
Agenda Packet Page 69 of 293
Quote # SSPQ14388
Quote Date: 4/9/2025
Prepared by: Jennifer Inouye
Prepared for: Kevin Ma
Phone # (510) 215-4338
Sold To: C Ship To: ity of El Cerrito City of El Cerrito Kevin Ma Kevin Ma
10890 San Pablo Avenue 10890 San Pablo Avenue
El Cerrito, CA 94530
United States El Cerrito CA 94530
Ln # Qty Part Number Description Unit Price Ext. Price
1 Palo Alto Networks - 3 Years
Community Center
2 1 PAN-PA-460 Palo Alto Networks PA-460 $3,517.50 $3,517.50 3 1 PAN-PA-460-BND-CORESEC $6,682.26 $6,682.26
-3YR
PA-460, Core Security Subscription Bundle (Advanced Threat Prevention, Advanced URL Filtering, Advanced Wildfire, Advanced DNS Security and SD- WAN ), 3 years (36 months) term
4 1 PAN-SVC-PREM-460-3YR PA-460, Premium support, 3 years (36 months), term. $2,847.15 $2,847.15 5 1 PAN-PWR-50W-AC 50W AC power adapter for PA-440, PA-450 and PA-460 $98.00 $98.00 6 1 PAN-PA-400-RACKTRAY Rack mountable tray for up to two PA-400s and 4 power $147.00 $147.00 adapters for a 4 post rack mount (PA-440/450/460 models only) SubTotal $13,291.91
Sales Tax $385.66
Shipping $0.00
Total $13,677.57
Please send licensing and authorization codes to:

Kevin Ma
[email protected]
Expiry Date: 7/8/2025
Terms and conditions
* Quote valid for 30 days - acceptance based on credit approval * Purchase Order must include: end user name, street address, email address and phone number for updates. * Prices quoted do not include applicable shipping
Customer Authorized Signature Date
Customer Name and Title PO Number
1304 South 51st Street, Richmond CA 94804 http://www.ssp.com Voice / Fax - 510-215-3423 1 of 1
Agenda Packet Page 70 of 293

AGENDA BILL
Agenda Item No. 8.A.

Date: May 20, 2025
To: El Cerrito City Council
From: Shannon Bassi, Human Resources Manager, City Management Subject: Annual Public Hearing on Vacancies, Recruitment and Retention Efforts

ACTION PROPOSED
Conduct a public hearing to receive and file a report on workforce vacancies, recruitment, and retention efforts in compliance with Assembly Bill 2561.

BACKGROUND/ANALYSIS
Assembly Bill 2561, which took effect on January 1, 2025, requires that public agencies hold at least one public hearing per fiscal year to discuss City workforce vacancies, recruitment and retention efforts for the prior calendar year. This presentation is for informational purposes only regarding the status of the City’s vacancies and its recruitment and retention efforts.

AB 2561, codified as Government Code section 3502.3, was introduced to address the issue of job vacancies in local government, which can adversely impact service delivery and employee workload. Among other requirements, the bill mandates that public agencies conduct a public hearing to present the status of vacancies, recruitment, and retention efforts before the agency’s governing body at least once per fiscal year. The annual hearing must be presented to the governing body prior to adoption of the following fiscal year’s budget. The goal is to identify any necessary changes to policies, procedures, and recruitment activities that may lead to obstacles in the hiring process and explore possible solutions to address obstacles.

In compliance with the new regulations, the City is required to present the following information and provide an opportunity for participation by Employee Organizations:

Vacancy Report
For the calendar year 2024, the City’s annual average percentage of vacancies was 10%. The table below outlines the percentage of vacancies at the beginning of each month.

Agenda Packet Page 71 of 293
Agenda Item No. 8.A.

Employee Organization Participation
Each recognized employee bargaining unit within the City must be given the opportunity to comment or present during the public hearing regarding concerns around vacancies and recruitment/retention efforts. (Gov. Code § 3502.3(b).) The Human Resources Division has notified the four represented bargaining units in the City of the opportunity to present.

Additional Reporting for High Vacancy Rates
When vacancies within a single bargaining unit meet or exceed 20% of authorized fulltime positions in that bargaining unit, upon request of the recognized employee organization for that bargaining unit, the City must provide additional information during the public hearing, including the following: (1) the total number of vacancies within the bargaining unit; (2) the number of applicants; (3) the average number of days to fill positions; and (4) opportunities to improve compensation and working conditions for employees in the bargaining unit. (Gov. Code § 3502.3(c).) For the calendar year 2024, all the City’s bargaining units were under the 20% vacancy rate, which is summarized below:

Agenda Packet Page 72 of 293
Agenda Item No. 8.A.

The attached written presentation and the oral presentation that staff will make as part of the public hearing will provide a detailed overview of the City's efforts related to recruitment and retention.

STRATEGIC PLAN CONSIDERATIONS
This action supports the City’s Strategic Plan Goal(s) of:
• High Performing Organization; and
• Community Safety; and
• Livability and Belonging; and
• Infrastructure and Amenities; and
• Environmental Sustainability.

ENVIRONMENTAL CONSIDERATIONS
This section is not applicable to this agenda item.

FINANCIAL CONSIDERATIONS
There is no direct fiscal impact associated with conducting the public hearing required under Government Code section 3205.3.

LEGAL CONSIDERATIONS
The City attorney has reviewed the information presented to ensure compliance with the new regulations of AB2561.

Reviewed by:

Karen Pinkos, City Manager
Attachments:

Agenda Packet Page 73 of 293

AGENDA BILL
Agenda Item No. 8.B.

Date: May 20, 2025
To: El Cerrito City Council
From: Crystal Reams, Finance Director/City Treasurer, Finance Department; Tony Thrasher, Principal Consultant, Wildan
Subject: Presentation of 2025 Cost Allocation User Fee Study; and Public Hearing and Approval of Fiscal Year 2025-26 Master Fee Schedule

ACTION PROPOSED
Receive and file a presentation on the 2025 Cost Allocation User Fee study; hold a public hearing and, upon conclusion, adopt a resolution approving the Fiscal Year 2025- 26 Master Fee Schedule.

BACKGROUND
The Master Fee Schedule, which includes all City user fees, charges for services, Planning and Building fees, and business license tax rates, is revised annually as required by El Cerrito Municipal Code §4.01.010. Adjustments to fees and charges for service are intended to cover changes in the City’s cost of providing programs and services.

During Fiscal Year 2024-25 the City contracted with Willdan to conduct a cost allocation study and a user fee study to analyze the costs and fees to propose adjustments for Fiscal Year 2025-26. The Cost Allocation Study and User Fee Study (Attachment 1) determine the total costs of different City operations and the costs of providing the programs and services listed in the Master Fee Schedule, respectively.

Recommended changes to fees in the Master Fee schedule are proposed largely to bring the fees in line with the updated costs of the related programs and services. In some cases, a proposed fee may not fully cover the cost of the program or services, but maintaining a below-cost fee or reducing the fee may be necessary to maintain alignment with other cities and organizations that have comparable programs. Increases in fees were also analyzed to be consistent with legal restrictions and regulatory guidelines.

The City utilized the Cost Allocation and Fee Studies and inflation statistics from the U.S. Bureau of Labor Statistics for the Western Metropolitan Area (San FranciscoOakland-Hayward) as well as impacts from the City’s labor contracts and other costs of providing services. For building permit fees, consistent with the fee program, the City used the Engineering News Construction Cost Index and Building Valuation, with a Bay Area adjuster. After the proposed changes, City fees do not exceed the costs of providing services for which the fees are charged.

Agenda Packet Page 74 of 293
Agenda Item No. 8.B.

The City's Municipal Code requires that Business License Taxes be revised based on the percentage change from the February 1988 figure of 117.0 in the Revised Consumer Price Index for Urban Wage Earners and Clerical Workers for the San Francisco-Oakland Bay Area as published by the Department of Labor for the month of February prior to the fiscal year in which the rate adjustments is applicable. Thus, the Business License Taxes were not included in the user fee study performed by Willdan.

ANALYSIS
The FY 2025-26 proposed fee changes reflect various increases and decreases, excluding fees governed by regulatory or other restrictions or allowable cost recovery recommendations. Several fees are recommended for elimination or consolidation for administrative ease, and several new fees are proposed to support new services or state mandates. The primary adjustment factors include cost of living adjustments for City staff, inflationary impacts on the City's costs, and/or re-evaluation of costs for services through the City-wide cost allocation plan study and the user fee study conducted by Willdan.

Attachment 3, FY 2025-26 Proposed Master Fee Schedule, details all of the proposed fee changes, other adjustments, or movement/relocation of fees to other fee subcategories.

STRATEGIC PLAN CONSIDERATIONS
This action supports the City’s Strategic Plan Goal(s) of:
• High Performing Organization by allowing the City to ensure that revenue meets the cost of providing services.

ENVIRONMENTAL CONSIDERATIONS
This section is not applicable to this agenda item.

FINANCIAL CONSIDERATIONS
The estimated revenue generated by fees, charges for service, and business license taxes was included in the City’s FY 2024-25/FY 2025-26 Adopted Budget based on the Master Fee Schedule approved by the City Council. The proposed changes do not warrant decreases to current revenue amounts proposed in the FY 2025-26 proposed budget.

LEGAL CONSIDERATIONS
Except for Development Fees, which will become effective 60 days after approval of this schedule, all fees listed in the Master Fee Schedule will become effective July 1, 2025, on the first day of the new fiscal year.

Agenda Packet Page 75 of 293
Agenda Item No. 8.B.

As required by California Government Code §66018(a), the City is required to conduct a public hearing prior to adopting Planning, Building, and some other new fees or fee increases. Notification of this public hearing was completed in accordance with State law and the El Cerrito Municipal Code. Notice was emailed to individual/entities that have previously requested to be notified regarding development fees on May 6, 2024; and published in the West County Times, a subsidiary of East Bay Times Newspaper Group, on May 10, 2025, and May 16, 2025.

Reviewed by:

Karen Pinkos, City Manager
Attachments:

1. 2025 Cost Allocation User Fee Study

2. Resolution

3. Exhibit A to Resolution - Master Fee Schedule

4. Presentation
Agenda Packet Page 76 of 293
City of El Cerrito, CA
User Fee Study
May 14, 2025
Agenda Item No.

8.B. Attachment 1
Agenda Packet Page 77 of 293
i Comprehensive User Fee Study

TABLE OF CONTENTS
TABLE OF CONTENTS ................................................................................................. i Executive Summary .................................................................................................. 1 User Fee Background ............................................................................................... 2 Background .................................................................................................................................................. 2 California User Fee History .......................................................................................................................... 2 Additional Policy Considerations ................................................................................................................. 3 Study Objective ....................................................................................................... 4 Scope of the Study ....................................................................................................................................... 4 Aim of the Report......................................................................................................................................... 5 Project Approach and Methodology ........................................................................... 6 Conceptual Approach................................................................................................................................... 6 Fully Burdened Hourly Rates........................................................................................................................ 6 Summary Steps of the Study ........................................................................................................................ 7 Allowable Costs ............................................................................................................................................ 7 Methodology ................................................................................................................................................ 8 Quality Control/Quality Assurance .............................................................................................................. 8 Reasons for cost increases/decreases over current fees............................................................................. 8 City Staff Contributions ................................................................................................................................ 9 El Cerrito User Fees ............................................................................................... 10 Cost Recovery............................................................................................................................................. 10 Subsidization .............................................................................................................................................. 10 Revenue Analysis ....................................................................................................................................... 11 Impact on Demand (Elasticity) ................................................................................................................... 11 Summary .................................................................................................................................................... 11 Citywide Services .................................................................................................. 13 Analysis ...................................................................................................................................................... 13 Business License .................................................................................................... 14 Analysis ...................................................................................................................................................... 14 Planning ............................................................................................................... 15 Analysis ...................................................................................................................................................... 15 Agenda Packet Page 78 of 293
ii Comprehensive User Fee Study
Building ................................................................................................................ 16 Analysis ...................................................................................................................................................... 16 Public Works ......................................................................................................... 17 Analysis ...................................................................................................................................................... 17 Fire ..................................................................................................................... 18 Analysis ...................................................................................................................................................... 18 Police ................................................................................................................... 19 Analysis ...................................................................................................................................................... 19 Recreation ............................................................................................................ 20 Analysis ...................................................................................................................................................... 20 Appendix A – Total Allowable Cost to be Recovered .................................................. 21 Appendix B –Fully Burdened Hourly Rates ................................................................ 22 Appendix C – Cost Recovery Analysis ....................................................................... 27

Agenda Packet Page 79 of 293
1 Comprehensive User Fee Study
Executive Summary
The City of El Cerrito engaged Willdan Financial Services (Willdan) to determine the full costs incurred by the City to support the various activities for which the City charges user fees. Due to the complexity and the breadth of performing a comprehensive review of fees, Willdan employed a variety of fee methodologies to identify the full costs of individual fee and program activities. This report and the appendices herein identify 100% full cost recovery for City services. Appendix C details the full cost and suggested fees as determined through discussion with departmental staff. The recommended fees identified herein are either at or less than full cost recovery.

Agenda Packet Page 80 of 293
2 Comprehensive User Fee Study
User Fee Background
Background
As part of a general cost recovery strategy, local governments adopt user fees to fund programs and services that provide limited or no direct benefit to the community as a whole (“User Fees”). As cities struggle to maintain levels of service and variability of demand, they have become increasingly aware of subsidies provided by the General Fund and have implemented cost-recovery targets. To the extent that governments use general tax monies to provide individuals with private benefits, and not require them to pay the full cost of the service (and, therefore, receive a subsidy), the government is limiting funds that may be available to provide other community-wide benefits. In effect, the government is using community funds to pay for private benefits. Unlike most revenue sources, cities have more control over the level of user fees they charge to recover costs, or the subsidies they can institute.

Fees in California are required to conform to the statutory requirements of the California Constitution, Proposition 218, Proposition 26, and the California Code of Regulations. The Code also requires that the City Council adopt fees by either ordinance or resolution, and that any fees in excess of the estimated total cost of rendering the related services must be approved by a popular vote of two-thirds of those electors voting because the charge would be considered a tax and not a fee. There are no fees suggested to be set above the cost of service and as such a public vote is not required.

California User Fee History
Before Proposition 13, in times of fiscal shortages, California cities were able to raise property taxes, which funded everything from police and recreation to development-related services. However, this situation changed with the passage of Proposition 13 in 1978.

Proposition 13 established the era of revenue limitation in California local government. In subsequent years, the state saw a series of additional limitations to local government revenues. Proposition 4 (1979) defined the difference between a tax and a fee: a fee can be no greater than the cost of providing the service; and Proposition 218 (1996) further limited the imposition of taxes for certain classes of fees. As a result, cities were required to secure a supermajority vote in order to enact or increase taxes. Due to the thresholds needed to increase local taxes, cities have less control and very few successful options for new revenues.

The State of California took a series of actions in the 1990’s and 2000’s to improve the State’s fiscal situation, at the expense of local governments. In 2004-05, the Educational Revenue Augmentation Funds (“ERAF”) take-away of property taxes and the reduction of Vehicle License Fees further reduced local tax revenues.

In addition, on November 2, 2010, California voters approved Proposition 26, the “Stop Hidden Taxes Initiative”, which is aimed at defining “regulatory fees” as a special tax rather than a fee, thus requiring approval by two-thirds vote of local voters. These regulatory fees are typically intended to mitigate the societal and environmental impacts of a business or person’s activities. Proposition 26 contains seven categories of exceptions. The fees analyzed as part of a User Fee study typically fall under categories one through five consisting of charges for specific benefits, government service, regulatory need, for use of government property, or a fine/penalty.

Agenda Packet Page 81 of 293
3 Comprehensive User Fee Study
Additional Policy Considerations
State regulations require that municipalities update their fee schedules to reflect the actual costs of certain public services primarily benefiting users. User Fees recover costs associated with the provision of specific services benefiting the user, thereby typically reducing the use of General Fund monies for such purposes.

In addition to collecting the direct cost of labor and materials associated with processing and administering user services, it is common for local governments to recover reasonable support costs. Support costs are those costs relating to a local government’s central service departments that are allocable to the local government’s operating departments. Central services support was incorporated using a 15% de minimis indirect overhead rate since the City currently does not have an indirect cost allocation plan. The de rate use as indirect support when a current allocation plan is not present is recommended in the 1 CFR Part 225 Cost Principles, which is a federal standard that is more restrictive than is needed for City user fee cost attribution and is therefore a reasonable approach to use. The purpose of the indirect rate is to account for the citywide central service functions of the City such as Finance, City Manager, City Clerk, Building Maintenance, Information Technology, and Human Resources support of all other operating departments and funds of the City that they support, that provide services to the public.

As labor effort and costs associated with the provision of services fluctuate over time, a significant element in the development of any fee schedule is that it has the flexibility to remain current. Therefore, it is recommended that the City include an inflationary factor in the resolution adopting the fee schedule to allow the City to annually increase or decrease the fees by changes in a pre-approved inflationary index, as described below. However, such inflationary increases shall not exceed the reasonable estimated cost of providing the services each year.

The City may employ many different inflationary factors. The most commonly used inflator is some form of the Consumer Price Index (CPI) as it is widely well known and accepted. A similar inflator is the implicit price deflator for GDP, which is much like the CPI except that while the CPI is based on the same “basket” of goods and services every year, the price deflators’ “basket” can change year to year. Since the primary factor for the cost of a City’s services is usually the costs of the personnel involved, tying an inflationary factor that connects more directly to the personnel costs can also be suitable if there is a clear method, or current practice of obtaining said factor.

Each City should use an inflator that they believe works the best for their specific situation and needs but cannot rely solely on the CPI increase as it is incumbent upon each agency to ensure the amount of the fees charged does not exceeds the reasonable estimated costs of providing the services. It is also recommended that the City perform this internal review annually with a comprehensive review of services and fees performed every five years, which would include adding, amending, or removing fees for programs/services.

Agenda Packet Page 82 of 293
4 Comprehensive User Fee Study
Study Objective
As the City of El Cerrito seeks to efficiently manage limited resources and adequately respond to increased service demands, it needs a variety of tools. A User Fee Study provides assurance that the City has the best information and the best resources available to make sound decisions, fairly and legitimately set fees, maintain compliance with state law and local policies, and meet the needs of the City administration and its constituency. Given the limitations on raising revenue in local government, the City recognizes that a User Fee Study is a very cost-effective way to understand the total cost of services and identify potential fee deficiencies. Essentially, a User Fee is a payment for a requested service provided by a local government that primarily benefits an individual or group.

The total cost of each service included in this analysis is based on the full cost of providing City services, including direct salaries and benefits of City staff, direct departmental costs, and indirect costs from central service support. This study determines the full cost recovery fee for the City to provide each service; however, each fee is set at the City’s discretion, up to 100% of the total cost, as specified in this report.

The principal goal of the study was to help the City determine the full cost of the services that the City provides. In addition, Willdan established a series of additional objectives including:
 Developing a rational basis for setting fees
 Identifying subsidy amount, if applicable, of each fee in the model  Ensuring compliance with State law
 Developing an updatable and comprehensive list of fees  Maintaining accordance with City policies and goals
The study results will help the City better understand its true costs of providing services and may serve as a basis for making informed policy decisions regarding the most appropriate fees, if any, to collect from individuals and organizations that require individualized services from the City.

Scope of the Study
The scope of this study encompasses a review and calculation of the user fees charged by the following El Cerrito departments and fee groups:
 Citywide Services
 Business License
 Planning
 Building
 Public Works
 Fire
 Police
 Recreation
Agenda Packet Page 83 of 293
5 Comprehensive User Fee Study
The study involved the identification of existing and potential new fees, fee schedule restructuring, data collection and analysis, orientation and consultation, quality control, communication and presentations, and calculation of individual service costs (fees) or program cost recovery levels.

Aim of the Report
The User Fee Study focused on the cost of City services, as City staff currently provide them at existing, known, or reasonably anticipated service and staff level needs. This report provides a summary of the study results, and a general description of the approach and methods Willdan and City staff used to determine the recommended fee schedule. The report is not intended to document all of the numerous discussions throughout the process, nor is it intended to provide an influential dissertation on the qualities of the utilized tools, techniques, or alternative approaches.

Agenda Packet Page 84 of 293
6 Comprehensive User Fee Study
Project Approach and Methodology
Conceptual Approach
The basic concept of a User Fee Study is to determine the “reasonable cost” of each service provided by the City for which it charges a user fee. The full cost of providing a service may not necessarily become the City’s fee, but it serves as the objective basis as to the maximum amount that may be collected.

The standard fee limitation established in California law for such fees is the “estimated, reasonable cost” principle. In order to maintain compliance with the letter and spirit of this standard, every component of the fee study process included a related review. The use of budget figures, time estimates, and improvement valuation clearly indicates reliance upon estimates for some data.

Fully Burdened Hourly Rates
The total cost of each service included in this analysis is primarily based on the Fully Burdened Hourly Rates (FBHRs) that were determined for City personnel directly involved in providing services. The FBHRs include not only personnel salary and benefits (see Appendix B), but also any costs that are reasonably ascribable to personnel. The cost elements that are included in the calculation of fully burdened rates are:
 Salaries & benefits of personnel involved
 Operating costs applicable to fee operations
 Departmental support, supervision, and administration overhead  Indirect City-wide overhead costs calculated through the 15% de minimis indirect rate An important factor in determining the fully burdened rate is in the calculation of productive hours for personnel. This calculation takes the available workable hours in a year of 2,080 and adjusts this figure to 1,650 productive or billable hours to account for calculated or anticipated hours’ employees are involved in non-billable activities such as paid vacation, sick leave, holidays, and other considerations as necessary.

Dividing the full cost, including overhead, of a position by the number of productive hours provides the FBHR.

The FBHRs are then used in conjunction with time estimates, when appropriate for how a service is provided, to calculate a fee’s cost based on the personnel and the amount of their time that is involved in providing each service.

Agenda Packet Page 85 of 293
7 Comprehensive User Fee Study
Summary Steps of the Study
The process of the study is straightforward and simple in concept. The following list provides a summary of the study process steps:

Allowable Costs
This report identifies three types of costs that, when combined, constitute the fully burdened cost of a service (Appendix A). Costs are defined as
direct labor, including salary and benefits,
departmental overhead costs, and the City’s
central services overhead, where
departmental and central service overhead
costs constitute support costs. These cost
types are defined as follows:
 Direct Labor (Personnel Costs): The
costs related to staff salaries for
time spent directly on fee-related
services.
 Departmental Overhead: A
proportional allocation of
departmental overhead costs,
including operation costs such as
supplies and materials that are necessary for the department to function.  Central Services Overhead: These costs represent services provided by those Central Services Departments whose primary function is to support other City departments.

Data Analysis
Department Interviews
Time Estimates
Labor Costs
Indirect Support
Building Cost Layers
Direct Services
Indirect Services
Department Overhead
City-Wide Overhead
Set Fees
Define the Full Cost of
Services
Set Cost Recovery Policy
Agenda Packet Page 86 of 293
8 Comprehensive User Fee Study
Methodology
The three methods of analysis for calculating fees used in this report are the:

Case Study Method (Standard Unit Cost Build-Up Approach): This approach estimates the actual labor and material costs associated with providing a unit of service to a single user. This analysis is suitable when City staff time requirements do not vary dramatically for a service, or for special projects where the time and cost requirements are easy to identify at the project’s outset. Further, the method is effective in instances when a staff member from one department assists on an application, service or permit for another department on an as-needed basis. Costs are estimated based upon interviews with City staff regarding the time typically spent on tasks, a review of available records, and a time and materials analysis.

Program Cost Approach: In some instances, the underlying data is not available or varies widely, leaving a standard unit cost build-up approach impractical. In addition, market factors and policy concerns (as opposed to actual costs) tend to influence rental based fee levels more than other types of services. Willdan employed a different methodology where appropriate to fit a program’s needs and goals. Typical programmatic approach cases are valuation-based fees, Recreation programs, and instances where a program cost is divided over the user base to obtain a per applicant cost for shared cost services.

Valuation Based Fees: This method of collection is used when the valuation of the improvement can be used as a proxy for the amount of effort it would take for City staff to complete the service provided. More specifically, this approach is commonly used for certain User Fees in the Building Division. It is generally accepted that as a project’s size scales up, the cost of the project increases, and the amount of effort needed to review and inspect also increases. Using valuation-based fees provides for a system that can adjust as project sizes scale. Land is not included in the valuation.

Quality Control/Quality Assurance
All study components are interrelated, thus flawed data at any step in the process will cause the ultimate results to be inconsistent and unsound. The elements of our Quality Control process for User Fee calculations include:
 Involvement of knowledgeable City staff
 Clear instructions and guidance to City staff
 Reasonableness tests and validation
 Internal and external reviews
 Cross-checking
Reasons for cost increases/decreases over current fees
Within the fee tables in Appendix C, the differences are identified between the full costs calculated through the study and the fee levels currently in effect. The reasons for differences between the two can arise from a number of possible factors including:

Agenda Packet Page 87 of 293
9 Comprehensive User Fee Study
 Previous fee levels may have been set at levels less than full cost intentionally, based on policy decisions
 Position staffing levels, seniority, and the positions that complete fee and service activity may vary from when the previous costs were calculated
 Personnel and materials costs could have increased at levels that differed from any inflationary factors used to increase fees since the last study
 Changes in processes and procedures within a department, or the City as a whole  Changes in the demand for services in a City may have also changed the staffing or cost structure of departments over time
City Staff Contributions
As part of the study process, Willdan received tremendous support and cooperation from City staff, which contributed and reviewed a variety of components to the study, including:
 Budget and other cost data
 Staffing structures
 Fee and service structures, organization, and descriptions  Direct work hours (billable/non-billable)
 Time estimates to complete work tasks
 Review of draft results and other documentation
A User Fee Study requires significant involvement of the managers and line staff from the departments on top of their existing workloads and competing priorities. The contributions from City staff were critical to this study. We would like to express our appreciation to the City and its staff for their assistance, professionalism, positive attitudes, helpful suggestions, responsiveness, and overall cooperation.

Agenda Packet Page 88 of 293
10 Comprehensive User Fee Study
El Cerrito User Fees
Cost Recovery
The cost recovery models, by department/division fee type, are presented in detail in Appendix C. Full cost recovery is determined by summing the estimated amount of time each position (in increments of minutes or hours) spends to render a service. Time estimates for each service rendered were obtained through interviews conducted with City staff for each department/division fee included in the study. The resulting cost recovery amount represents the total cost of providing each service. The City’s current fee being charged for each service, if applicable, is provided in this section, as well, for reference.

It is important to note that the time data used to determine the amount of time each employee spends assisting in the provision of the services listed on the fee schedule is essential in identifying the total cost of providing each service and will differ from City to City depending on staffing, positions involved, experience of staff, the use of consultants, and the policies and procedures in place for each City.

Specifically, in providing services, a number of employees are often involved in various aspects of the process, spending anywhere from a few minutes to several hours on the service.

The primary goal of this study was to identify the cost of City services, to provide information to help the City make informed decisions regarding the actual fee levels and charges. The responsibility of determining the final fee levels is a complicated task. City staff must consider many issues in formulating recommendations, and the City Council must consider those same issues and more in making the final decisions.

City staff assumes the responsibility to develop specific fee level recommendations to present to the City Council. Unfortunately, there are no hard and fast rules to guide the City, since many of the considerations are based on the unique characteristics of the City of El Cerrito, and administrative and political discretion.

However, in setting the level of full cost recovery for each fee, one should consider whether the service solely benefits one end user or the general community.

Subsidization
Recalling the definition of a user fee helps guide decisions regarding subsidization. The general standard is that individuals (or groups) who receive a wholly private benefit should pay 100% of the full cost of the services. In contrast, services that are simply public benefit should be funded entirely by the general fund’s tax dollars. Unfortunately, for the decision makers, some services fall into the range between these two extremes.

Further complicating the decision, opponents of fees often assert that the activities subject to the fees provide economic, cultural, “quality of life,” or other community benefits that exceed the costs to the City, but it is important to distinguish the difference between any purported possible benefits that may be conveyed through the result of activities of the service receiver and the direct benefit being conveyed through the City providing the service to the requestor.

It is recommended the City consider such factors during its deliberations regarding appropriate fee levels.

Agenda Packet Page 89 of 293
11 Comprehensive User Fee Study
Of course, subsidization can be an effective public policy tool since it can be used to reduce fees to encourage certain activities (such as to ensure public safety) or allow some people to be able to afford to receive services they otherwise could not at the full cost. In addition, subsidies can be an appropriate and justifiable action, such as to allow citizens to rightfully access services, without overburdensome costs.

Despite the intent, it is important for the City and public to understand that subsidies must be covered by another revenue source, typically the General Fund’s other unrestricted funds.

Revenue Analysis
The revenue analysis of this User Fee Study Report is intended to provide additional context as a projection of what the fee changes will have in revenue, assuming no participation changes in service requests. The projections are based on the average fee change for each department and evaluates the projected revenue change resulting from suggested fees.

Impact on Demand (Elasticity)
Economic principles of elasticity suggest that increased costs for services (higher fees) will eventually curtail the demand for the services; whereas lower fees may spark an incentive to utilize the services and encourage certain actions. Either of these conditions may be a desirable effect to the City. However, the level of the fees that would cause demand changes is largely unknown. The cost of service study did not attempt to evaluate the economic or behavioral impacts of higher or lower fees; nevertheless, the City should consider the potential impacts of these issues when deciding on fee levels.

Summary
City staff is recommending setting user fees at suggested fee amounts as detailed in Appendix C. City and departmental goals, City Council priorities, policy initiatives, past performance, implementation issues, and other internal and external factors should influence staff recommendations and City Council decisions. In this case, the proper identification of additional services (new or existing services) and the update to a Department / Fee Group
Budgeted FY
24/25 Fee
Revenue
Projected
Revenue
Change
Business License $307,222 $32,726
Police $73,080 $11,087
Fire $923,568 $320,004
Public Works $575,120 $283,546
Building $2,783,952 $81,320
Planning $528,686 $86,639
Recreation $4,039,031 $128,004
Tobacco Retailer License $7,280 $945
Total $944,272
*Does not include new fees or services bas ed on actual cost Agenda Packet Page 90 of 293
12 Comprehensive User Fee Study
consistent and comprehensive fee schedule were the primary objectives of this study. City staff has reviewed the full costs and identified the recommended fee levels for consideration by City Council.

The following sections provide background for each department, division, and fee group and the results of this study’s analysis of their fees. For the full list of each fee’s analysis, refer to Appendix C of this report.

Agenda Packet Page 91 of 293
13 Comprehensive User Fee Study
Citywide Services
Citywide Services fees include services provided by the City Manager Department and its subsequent offices such as the City Attorney and City Clerk. Responsibilities of the Department include: Personnel/Employee Relations, Risk Management, Information Technology Systems, public information and outreach, policy development and legislative advocacy, grant management, and retention of all city records and Municipal Elections.

Analysis
Willdan individually reviewed the services associated with Citywide Services. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of the Citywide Services relied primarily upon a standard unit cost build-up approach for fees, excluding fees set by the State, whereby the reasonable cost of each fee occurrence was determined using staff time involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Central Services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that most current fees are currently below the full cost of providing services. Staff is recommending the fees be adjusted as detailed in Appendix C.

As a result, there would be:
 An increase to 11 fees;
 1 fee would decrease;
 7 new fees will be added;
 12 fees would remain as currently set, and;
 the average fee change would be an increase of 38% for current fees.

Agenda Packet Page 92 of 293
14 Comprehensive User Fee Study
Business License
Business license administration is overseen by the Community Development Department. The Department issues business licenses and parking permits and operates the Rent Registry program. It also provides support and guidance to businesses, working to ensure compliance while supporting business growth and retention efforts citywide.

Analysis
Willdan individually reviewed the services associated with Business License administration. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of the Business License administration relied primarily upon a standard unit cost build-up approach for fees, whereby the reasonable cost of each fee occurrence was determined using staff time involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Central Services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that current fees are currently below the full cost of providing services. Staff is recommending the fees be adjusted to full cost recovery as detailed in Appendix C. As a result, there would be:
 An increase to 2 fees;
 2 new fees will be added;
 1 fee would remain as currently set, and;
 the average fee change would be an increase of 11% for current fees.

Agenda Packet Page 93 of 293
15 Comprehensive User Fee Study
Planning
The Planning Division conducts both current and long-range planning activities to support a healthy, attractive, and resilient built environment. Responsibilities include implementing the General Plan and Specific Plans, performing entitlement reviews, staffing the Planning Commission and Design Review Board, and ensuring land use decisions align with community goals and state mandates.

Analysis
Willdan individually reviewed the services associated with the Planning Division. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of Planning services relied primarily upon a standard unit cost build-up approach, whereby the reasonable cost of each fee occurrence was determined using staff time involved in providing services to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City central services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that most of the current fees are underfunding the cost of most of the services.

Staff is recommending fees be adjusted to full cost recovery for most Planning services as detailed in Appendix C. As a result, there would be:
 An increase to 70 fees;
 17 fees would decrease;
 1 new fee will be added;
 15 fees would remain as currently set, and;
 the average fee change would be an increase of 16%
Agenda Packet Page 94 of 293
16 Comprehensive User Fee Study
Building
The Building Division provides permit, plan check, and inspection services to ensure all development complies with health and safety standards, including the California Building Code and El Cerrito Municipal Code. The division also collaborates with the Fire Department and implements modern permitting tools such as SolarApp+ for solar permitting.

Analysis
Willdan individually reviewed the services associated with the Building Division. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of Building services relied primarily upon a standard unit cost build-up approach, whereby we determined the reasonable cost of each fee occurrence using staff time to recover the direct cost of staff and pro-rata share of departmental costs, including indirect costs for City central services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that services are currently set above and below the full cost of providing them. It is recommended that the City adjust fees to full cost recovery for Building services as detailed in Appendix C. As a result, there would be:
 An increase to 120 fees;
 81 fees would decrease;
 7 new fees will be added;
 40 fees would remain as currently set, and;
 the average fee change would be a decrease of 1% for current fees.

In addition to the above referenced fees listed under Building, the Building Permit fees are also provided by this division. For the Building Permit fees, valuation is used as a proxy for measuring the effort needed to provide services on a case-by-case basis. This method is an industry standard widely used by other jurisdictions to evaluate the cost of providing service. It is generally understood that the larger and more complex a project is, the more time and effort that is required to provide the service. Project valuation also follows that trend. By using a combination of either project valuation or historical revenue figures along with a multiplier or cost recovery analysis for historical and anticipated future trends, current cost recovery along with variability in charges due to project type and scale is determined. The result of the cost analysis completed for the Building Permit program found that the program is currently operating at 97% cost recovery based on activity level averages over two years. Staff is recommending that the fees be increased to 100% cost recovery as detailed in Appendix C. A new variation of the Plan Review fee for factory built housing is recommended for adoption, that reduces the 65% Plan Review fee to 55%. The amount of effort required for Building Permit services for factory built housing was determined to be equivalent to other construction types and therefore will be charged the same rate.

Agenda Packet Page 95 of 293
17 Comprehensive User Fee Study
Public Works
The Public Works Department provides professional, timely, and effective service to the community through the following activities: Maintain, rehabilitate, and improve public facilities and infrastructure, including streets, sidewalks, multi-modal transportation facilities, parks, play fields, open spaces, paths and trails, public landscapes, urban forest, storm drains, creeks, stormwater treatment facilities, and public buildings. Operate and oversee the City’s recycling collection and integrated waste management programs and services. Develop, implement, and monitor the City’s environmental stewardship and sustainability initiatives, policies, programs, projects, and community engagement. Coordinate and oversee the activities of utility companies, private developers, and property owners within the public right-of-way. Serve as first responders, providing 24-hour, on-call response to flooding, vehicle accidents, illicit discharges and spills, downed tree limbs, and other urgent maintenance needs, as well as perform emergency planning work.

Provide liaison efforts with a variety of organizations and agencies to access state and regional resources and develop regional policies aligned with the City’s goals. Ensure compliance with various state, federal, and regional regulations governing Department operations and environmental requirements. Support various departments in reviewing and implementing projects, programs, and special events that enhance community safety, livability, belonging, and environmental sustainability.

Analysis
Willdan individually reviewed the services associated with the Public Works Department. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of the Public Works services relied primarily upon a standard unit cost build-up approach for fees, whereby the reasonable cost of each fee occurrence was determined using staff time involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Central Services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that current fees are currently not in line with the full cost of providing services. Staff is recommending the fees be adjusted as detailed in Appendix C. As a result, there would be:
 an increase to 75 fees;
 15 fees would decrease;
 8 fees would remain as currently set;
 1 new fee will be added, and;
 the average estimated fee increase would be around 51%.

Agenda Packet Page 96 of 293
18 Comprehensive User Fee Study
Fire
The Fire Department’s mission is to enhance community safety by reducing the loss of life and property and safeguarding the environment through effective response to fires, rescues, medical emergencies, hazardous material incidents, and major disasters. As an all-risk department, this mission is achieved by helping the community reduce the frequency and severity of emergencies through public education programs; enforcing laws, codes, and ordinances related to fire and life safety; abating identified fire hazards on City, private, and other agencies’ properties; and maintaining personnel, apparatus, equipment, and facilities in a constant state of readiness.

The Fire Department organizes resources into four divisions: Fire Prevention, Training, Operations/EMS, and Support Services. Three 56-hour-per-week Battalion Chiefs manage the Fire Prevention, Operations/EMS, and Support Services divisions on a rotating shift basis. One 40-hour-per-week Battalion Chief manages the Training Division. The Fire Chief provides management and oversight for all four divisions.

Analysis
Willdan individually reviewed the services associated with the Fire Department. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of Fire services relied primarily upon a standard unit cost build-up approach, whereby the reasonable cost of each fee occurrence was determined using staff time involved in providing services to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City central services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that most of the current fees are underfunding the cost of most of the services.

Staff is recommending the fees be adjusted as detailed in Appendix C. As a result, there would be:
 An increase to 61 fees;
 12 fees would decrease;
 1 new fee will be added;
 14 fees would remain as currently set, and;
 the average fee change would be an increase of 35%

Agenda Packet Page 97 of 293
19 Comprehensive User Fee Study
Police
The El Cerrito Police Department (ECPD) provides essential police services to the community. The department is organized into two divisions: Administration and Field Operations. The Department focuses on supporting the core services of emergency response and criminal investigation.

The ECPD partners with State, Federal, and other local agencies to provide services in a cost-effective manner. Notably, the Richmond Police Department provides dispatch services, while the County of Contra Costa provides crime laboratory and animal control services. The Department also assigns officers to the Richmond Police Department Crisis Response Team.

Analysis
Willdan individually reviewed the services and programs associated with the Police Department. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of the Police services relied primarily upon a standard unit cost build-up approach for fees, excluding violations, whereby the reasonable cost of each fee occurrence was determined using staff time involved with providing the service to recover the direct cost of staff and the pro-rata share of departmental costs, including indirect costs for City Central Services. Willdan then compared the calculated full cost against the current fee amount to determine, if charged, whether the current fee is recovering the costs associated with the requested service. The analysis found that most current fees are below the full cost of providing services. Staff is recommending the fees be adjusted as detailed in Appendix C. As a result, there would be:
 An increase to 49 fees;
 20 fees would decrease;
 10 fees would remain as currently set, and;
 The average fee change would be an increase of 15%.

Agenda Packet Page 98 of 293
20 Comprehensive User Fee Study
Recreation
The Recreation Department manages a full range of recreational services, special activities, and events for people of all ages and abilities. Staff work to ensure quality customer service in the delivery of programs and services. The Department: Provides childcare, after-school programming, enrichment classes, sports, summer camps, and volunteer opportunities for approximately 4,000 children and teens per year.

Schedules and provides activities and rentals for buildings, picnic areas, sports fields, tennis courts, and the Swim Center. Provides social services and enrichment activities for aging adults through Meals on Wheels, a lunch program, Easy Ride Paratransit, respite programs, and a variety of recreational activities. Ensures that well-rounded aquatic programs are implemented to meet the needs of the community. Provides support to the Committee on Aging, Park and Recreation Commission, and various other city and community organizations, departments, and committees. Works with employees to develop their talents and encourage future leadership. Identifies funding sources and support for the maintenance and enhancement of parks and recreation facilities.

Analysis
Willdan individually reviewed the services associated with the Recreation Department. The review also consisted of an evaluation of existing services in an effort to update the fee schedule.

The analysis of most Recreation programs encompassed facility rentals and other recreation services. The fee for use for government owned facilities and property can be set discretionally by the City, typically based on past usage characteristics, policy goals, and surrounding jurisdiction comparison. The cost of capital acquisition, maintenance, repair, and upgrade to the City and subsequently the public is offset through rental or use fees. As such these fees should be set using the knowledge of activity use for the facilities, policy desires of the City, and market factors when desirable. It is generally accepted that some Parks and Recreation programs provide a measure of public benefit to the residents and City as a whole, and as such is it common for services to bear significant subsidies. In addition, cities generally want to ensure that their programs and services remain affordable to the community at large, and that the programs remain competitive with surrounding jurisdictions. For a few of the fees in Recreation a standard cost of service approach was used, but some of the additional cost considerations above were not included as this is primarily an operational cost analysis study that does not include considerations for capital. The analysis found that the current fees for facility use and services are below the cost of providing them. The analysis also included a cost recovery analysis for Recreation as a whole and it was determined to be operating at around 51% cost recovery. The suggested fees detailed in Appendix C. would result in:
 An increase for 105 fees;
 4 fees would decrease;
 2 new fees will be added;
 the remaining fees would remain as currently set, and;  The average fee change would be an increase of 3%
Agenda Packet Page 99 of 293
21 Comprehensive User Fee Study
Appendix A – Total Allowable Cost to be Recovered
Below are the total allowable costs that may be recovered through User Fees; however, only a portion of the total allowable cost is recovered as staff not only works on services related to User Fees, but also works on an array of other City functions during the operational hours of the City. The amounts listed below will not reconcile to City budgets as costs that should not be included in overhead for personnel in the application of determining fully burdened hourly rates were excluded. Examples of these costs are capital, debt, monetary transfers, contract costs, and any other costs that are charged directly to the service requestor.

City of El Cerrito - User Fee Study
Overhead Rate Calculations
Department
Total Salaries &
Benefits
Department
Operating Cost
Direct
Overhead
%
Indirect
Allocation
%
101: City Clerk 455,609 25,078 6% 0%
101: City Manager 886,528 60,656 7% 0%
101: Community Development 2,907,189 662,594 23% 28%
101: Finance 1,245,280 172,929 14% 0%
101: Fire 14,455,611 1,207,899 8% 16%
101: Information Systems 691,030 73,828 11% 0%
101: Police 12,853,635 762,040 6% 20%
101: Public Works 314,569 33,660 11% 49%
101: Public Works Maintenance 660,282 273,556 41% 0%
101: Recreation 3,965,023 834,137 21% 30%
101: Recreation Custodial 684,579 162,468 24% 0%
202: Nat'l Pollut Dis Elim Sys 267,572 61,569 23% 21%
203: Land & Light Assess Distr 297,907 61,551 21% 22%
501: Integrated Waste Mgmt 2,286,214 612,416 27% 24%
Agenda Packet Page 100 of 293
22 Comprehensive User Fee Study
Appendix B –Fully Burdened Hourly Rates
Below are fully burdened hourly rates of staff positions that provide for the services detailed in Appendix C. The FBHRs were used to determine the full cost of each service. They include the salary and benefit costs for each position as well as all applicable overhead amounts for each position. When a central service department position works on a fee or project in the purview of an operating department, the overhead rates of the operating department (shown in Appendix A) will be applied to that central service positions’ salary and benefit rate for full cost recovery since indirect overhead cost only applies to non-central service functions of the City. For any user fee service request that is outside the scope of the fees detailed in Appendix C, or for services for which there is no fee currently set, the City can charge up to the full cost of the FBHR for personnel involved.

Agenda Packet Page 101 of 293
23 Comprehensive User Fee Study
City of El Cerrito - User Fee Study
Fully Burdened Hourly Rate Calculation
Department Title
Fully
Burdened
Hourly Rate
Position Rates
101: Community Development CD - ADMIN CLERK SPECIALIST $95.60 101: Community Development CD - Associate Planner $148.81 101: Community Development CD - Building Inspector II $153.33 101: Community Development CD - Building Official $245.61 101: Community Development CD - Building Permit Tech I $131.10 101: Community Development CD - Building Permit Tech III $153.31 101: Community Development CD - Community Development Director $309.47 101: Community Development CD - Management Assistant $143.78 101: Community Development CD - Neighborhood Presv. Officer $152.86 101: Community Development CD - Plan Checker II $172.25 101: Community Development CD - Planning Manager $258.13 101: Community Development CD - Senior Planner $197.34
101: Community Development CD - Senior Program Manager $185.92 101: City Clerk Clerk - City Clerk $196.74
101: City Clerk Clerk - Management Assistant $76.37
101: City Manager CM - Assistant City Manager $235.59
101: City Manager CM - Assistant to the City Manager $152.14 101: City Manager CM - City Manager $244.77
101: City Manager CM - Management Assistant $93.67
101: Finance Finance - Accountant I $97.31
101: Finance Finance - Budget/Financial Services Mngr $174.74 101: Finance Finance - Finance Director/City Treasurer $190.18 101: Finance Finance - Management Assistant $99.84
101: Finance Finance - Senior Accountant $111.81
101: Finance Finance - Senior Finance Technician $107.49 101: Fire Fire - Battalion Chief $304.91
101: Fire Fire - Battalion Chief/Paramedic $322.68
101: Fire Fire - Fire Captain $235.83
101: Fire Fire - Fire Captain/Paramedic $255.35
101: Fire Fire - Fire Captain/Paramedic Assign $255.25
101: Fire Fire - Fire Captain/Paramedic/FPO $276.80
101: Fire Fire - Fire Chief $344.53
101: Fire Fire - Fire Engineer $194.98
101: Fire Fire - Fire Engineer/Paramedic Assign $218.12 101: Fire Fire - Firefighter $161.10
101: Fire Fire - Firefighter/Paramedic Assign $186.18
Agenda Packet Page 102 of 293
24 Comprehensive User Fee Study
City of El Cerrito - User Fee Study
Fully Burdened Hourly Rate Calculation
Department Title
Fully
Burdened
Hourly Rate
Position Rates
101: Fire Fire - Firefighter/Paramedic Assignment $175.00 101: Fire Fire - Public Safety Executive Asst $115.63
101: Fire Fire - Senior Program Manager $133.46
202: Nat'l Pollut Dis Elim Sys Fund 202 - Associate Engineer $185.92 202: Nat'l Pollut Dis Elim Sys Fund 202 - Engineering Technician $120.93 202: Nat'l Pollut Dis Elim Sys Fund 202 - Maintenance Ops Supervisor $159.73 202: Nat'l Pollut Dis Elim Sys Fund 202 - Maintenance Svcs Leadworker $140.42 202: Nat'l Pollut Dis Elim Sys Fund 202 - Maintenance Worker $116.62 202: Nat'l Pollut Dis Elim Sys Fund 202 - Management Assistant $106.31 202: Nat'l Pollut Dis Elim Sys Fund 202 - Ops and Environmental Svcs Mgr $212.23 202: Nat'l Pollut Dis Elim Sys Fund 202 - Program Manager $179.50 202: Nat'l Pollut Dis Elim Sys Fund 202 - Public Works Director/City Eng $323.64 203: Land & Light Assess Distr Fund 203 - Custodian $80.40 203: Land & Light Assess Distr Fund 203 - Maintenance Ops Supervisor $158.21 203: Land & Light Assess Distr Fund 203 - Maintenance Svcs Leadworker $139.09 203: Land & Light Assess Distr Fund 203 - Maintenance Worker $115.51 203: Land & Light Assess Distr Fund 203 - Program Manager $177.79 101: Information Systems IS - Information Tech Specialist $115.26 101: Information Systems IS - Information Technology Manager $197.41 101: Information Systems IS - Network Security Engineer $114.59 501: Integrated Waste Mgmt IWM - Administrative Clerk $99.15 501: Integrated Waste Mgmt IWM - Assistant City Manager $347.53 501: Integrated Waste Mgmt IWM - Assistant to the City Manager $224.42 501: Integrated Waste Mgmt IWM - City Manager $361.06
501: Integrated Waste Mgmt IWM - Forklift Operator $116.13 501: Integrated Waste Mgmt IWM - Maintenance Ops Supervisor $169.67 501: Integrated Waste Mgmt IWM - Maintenance Svcs Leadworker $149.16 501: Integrated Waste Mgmt IWM - Maintenance Worker $123.88 501: Integrated Waste Mgmt IWM - Management Analyst III $172.27 501: Integrated Waste Mgmt IWM - Management Assistant $112.93 501: Integrated Waste Mgmt IWM - Ops and Environmental Svcs Mgr $225.44 501: Integrated Waste Mgmt IWM - Public Works Director/City Eng $343.79 501: Integrated Waste Mgmt IWM - Recycling Leadwkr -filled as Wkr $150.89 501: Integrated Waste Mgmt IWM - Recycling Maintenance Worker $137.84 501: Integrated Waste Mgmt IWM - Recycling Operations Supv $186.82 501: Integrated Waste Mgmt IWM - Waste Prevention Specialist $133.10 Agenda Packet Page 103 of 293
25 Comprehensive User Fee Study
City of El Cerrito - User Fee Study
Fully Burdened Hourly Rate Calculation
Department Title
Fully
Burdened
Hourly Rate
Position Rates
101: Police Police - Community Service Officer $117.11
101: Police Police - Police Captain $279.95
101: Police Police - Police Chief $373.67
101: Police Police - Police Corporal $189.94
101: Police Police - Police Lieutenant $308.46
101: Police Police - Police Officer $162.59
101: Police Police - Police Officer - Det Assign $173.45 101: Police Police - Police Officer - K9 $182.16
101: Police Police - Police Officer - Traffic $185.24
101: Police Police - Police Records Specialist $93.86
101: Police Police - Police Records Supervisor $142.84
101: Police Police - Police Sergeant $241.40
101: Police Police - Police Sergeant - Admin $264.74
101: Police Police - Property and Evidence Specialist $113.34 101: Police Police - Public Safety Executive Asst $102.58 101: Police Police - Senior Police Records Specialist $97.03 101: Public Works PW - Associate Engineer $194.81
101: Public Works PW - Engineering Technician $134.16
101: Public Works PW - Management Assistant $116.45
101: Public Works PW - Public Works Director/City Eng $359.04 101: Public Works Maintenance PW Maint - Maintenance Ops Supervisor $152.25 101: Public Works Maintenance PW Maint - Maintenance Svcs Leadworker $133.85 101: Public Works Maintenance PW Maint - Maintenance Worker $103.66 101: Public Works Maintenance PW Maint - Management Analyst III $154.59 101: Public Works Maintenance PW Maint - Public Works Director/City Eng $308.50 101: Recreation Rec - Admin Clerk Specialist $115.68
101: Recreation Rec - Assistant Program Supervisor $118.11 101: Recreation Rec - Childcare Teacher $101.63
101: Recreation Rec - Community Services Coordinator $119.46 101: Recreation Rec - Recreation Director $294.67
101: Recreation Rec - Recreation Supervisor $186.11
101: Recreation Custodial Rec Custodial - Custodial Maintenance Leadworker $121.65 101: Recreation Custodial Rec Custodial - Custodian $79.37 101: Recreation Custodial Rec Custodial - Recreation Supervisor $158.56 Agenda Packet Page 104 of 293
26 Comprehensive User Fee Study
City of El Cerrito - User Fee Study
Fully Burdened Hourly Rate Calculation
Department Title
Fully
Burdened
Hourly Rate
Part Time/Contract Positions
101: Recreation Childcare Aide $35.38
101: Recreation Childcare Teacher $40.00
101: Recreation Community Services Coordinator Temp $58.78 101: Public Works Maintenance Maintenance Worker I $40.36 101: Recreation Custodial PT Custodian $35.47
501: Integrated Waste Mgmt Recycling Operations Worker $47.16 101: Recreation Van Driver II $41.97
101: Police Police Recruit $42.05
101: Recreation Lifeguard I $38.93
101: Recreation Lifeguard II $40.87
101: Recreation Recreation Leader I $35.32
101: Recreation Recreation Leader II $37.07
101: Recreation Recreation Leader III $40.78
101: Recreation Recreation Leader IV $99.70
101: Recreation Van Driver I $38.03
101: Recreation Aquatics Assistant I $32.79
101: Recreation Aquatics Assistant II $33.62
101: Recreation Aquatics Instructor I $41.97
101: Recreation Aquatics Instructor II $44.08
101: Recreation Aquatics Instructor III $63.86
101: Recreation Facility Attendant $37.07
101: Recreation Pool Manager $46.29
101: Recreation Senior Lifeguard $38.93
City Attorney $442.00
Agenda Packet Page 105 of 293
27 Comprehensive User Fee Study
Appendix C – Cost Recovery Analysis
The following tables provide the results of the analysis, resulting full cost recovery amount, and recommended fees. For fees, services, and penalties in which the full cost, existing fee, and suggested fee is listed as “NA”, the amount or percentage was not calculable. This is most common when either the current or the suggested fee includes a variable component that is not comparable on a one-to-one basis, a full cost was not calculated (for penalties, fines, market-based fees, or items not included in the study), or when there is not a current fee amount to compare against.

Agenda Packet Page 106 of 293
Citywide Services
Item No. Title Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 1 Printing, Reproduction, Documents2 Photocopies3 Photocopies (11x17 or smaller) $0.10 per page $0.10 0% $0.10 $04 Retrieval fee for Campaign Statements older than 5 years $5.00 per request NA NA $5.00 $05 Photocopies (11x17 or larger) $0.25 per page $2.05 0% $2.05 $26 Maps7 City Maps (First sheet includes search and restock cost per original searched.) $3.37 each NA NA $3.37 $0 8 Special Studies Maps, 11" x 17" $5.62 each NA NA $5.62 $09 Special Studies Maps, 36" x 54" $43.87 each NA NA $43.87 $010 Subpoena Duces Tecum11 per CA Evidence Code §1563 Based on Code NA NA Based on Code $012 Miscellaneous Services and Charges13 Notary, Certification, Legal and Special Services14 Notary Services (Set by Calif. Secretary of State) $15.00 per signature NA NA $15.00 $015 City Clerk Document Certification $6.75 each $22.95 35% $15.00 $816 Legal Fees—Recovery of legal costs in lawsuits and other instances when the City could be entitled to reimbursement of legal costs. actual cost labor and overhead NA NA actual cost $0 17 Finance Charges18
Finance Charge on fees remaining unpaid for a period exceeding 30 days (unless the ordinance establishing the fee provides for a penalty in a different amount)

1.5% per month unpaid balance NA NA 1.5% per month $0
19 Returned Check Fee $26.00 per check NA NA First Check $25/$35 Additional Check -$1 20 Duplicate Business License Certificate $7.87 per copy $15.27 0% $15.27 $721 Credit Card Transaction Fee actual cost per transaction NA NA actual cost $0 28 Agenda Packet Page 107 of 293
Citywide Services
Item No. Title Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 22 Parking Permits23 1 to 3-year cycles $40.50 per year $68.35 1% $68.00 $2824 14-day Temporary Parking Permit $40.50 each $68.35 1% $68.00 $2825 Replacement Parking Permit $40.50 each $68.35 1% $68.00 $2826 Use of Council Chambers (Government Agencies Only) $47.32 per meeting $58.78 15% $50.00 $3 27 Use of Council Chambers with Technology/AV Support $47.32 per meeting $192.46 14% $165.00 $118 28 Tobacco Retailer License Program Fees29 Tobacco retailer license (initial license and renewal) $523.49 Per location $590.99 0% $590.00 $6730 Re-inspection fee (for non-compliant businesses) actual cost Hourly NA NA actual cost $031 Rent Registry32 Rent Registry $44.99 per unit $49.73 1% $49.00 $433 Election Related Filing Fees34 Citizen Initiative Petition Filing Fee (refunded if petition qualifies within one year of filing) $200.00 per filing NA NA $200.00 $0 35 Code Enforcement36 Administration Citation Fee $20.55 $183.41 0% $183.00 $16237 Title Report New each NA NA Actual Cost +10% NA38 Inspection Warrant New each $1,146.48 0% $1,146.00 NA39 Abatement Warrant New each $1,299.34 0% $1,299.00 NA40 Lien and Special Assessment New each $611.46 0% $611.00 NA41 Release of Recordation New each $305.73 0% $305.00 NA42 Recording of Pendency Action New each $305.73 0% $305.00 NA43 Re-inspections (non-compliant parcel) New each $152.86 1% $152.00 NA 29 Agenda Packet Page 108 of 293

BUSINESS LICENSE
Item No. Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Business Enrollment $90.15 per license $98.02 0% $98.00 $82 Business License Renewal $30.05 per license $35.35 1% $35.00 $53 Accessibility Compliance and Education Fee $4.12 per license (State Mandated AB 1379) NA NA $4.12 $04 Admin Delinquent Business License Collection Fee
New Per license Staff time, software, Plus Citation Fee $47.35 1% $47.00 NA 5 Business Name Change New Per license $28.76 3% $28.00 NA 30 Agenda Packet Page 109 of 293

PLANNING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 San Pablo Avenue Specific Plan Design Review2 Tier 1 Residential and Non-Residential Projects (includes signs) $2,557.00 Cat Ex and mailing cost included $3,027.86 0% $3,027.00 $470 3 Tier 1 Permanent Signs $668.00 Cat Ex and mailing cost included $772.09 0% $772.00 $1044 Tier 1 Sidewalk Sign Permit (only) $186.00 Cat Ex and mailing cost included $219.61 0% $219.00 $335 Tier 1 Temporary Signs and/or Banners $62.00 Cat Ex and mailing cost included $122.20 0% $122.00 $606 Tier 1/AUP Sidewalk Seating (off ROW) $682.00 Cat Ex and mailing cost included $728.49 0% $728.00 $467 Outdoor Dining and Retail Permit $682.00 Cat Ex and mailing cost included $446.47 0% $446.00 -$2368 Tier 1 - Minor $947.00 Cat Ex and mailing cost included $1,273.82 0% $1,273.00 $3269 Tier 2 Residential and Non Res Projects - Up to 2,500 sqft $3,765.00 Mailing costs included $5,392.19 0% $5,392.00 $1,62710 Tier 3 Residential and Non Res Projects - Up to 2,500 sqft $4,749.00 Mailing costs included $5,046.04 0% $5,046.00 $297 11 Tier 2 Residential and Non Res Projects - 2,501 - 10,000 sqft $9,933.00 Mailing costs included $12,013.93 0% $12,013.00 $2,080 12 Tier 3 Residential and Non Res Projects - 2,501 - 10,000 sqft $9,633.00 Mailing costs included $11,667.34 0% $11,667.00 $2,034 13 Tier 2 Residential and Non Res Projects - 10,001 – 40,000 sqft $16,279.00 Mailing costs included $17,972.31 0% $17,972.00 $1,693 14 Tier 3 Residential and Non Res Projects - 10,001 – 40,000 sqft $13,685.00 Mailing costs included $16,742.93 0% $16,742.00 $3,057 15 Tier 2 Residential and Non Res Projects - 40,001 – 100,000 sqft $21,089.00 Mailing costs included $25,542.90 0% $25,542.00 $4,453 16 Tier 3 Residential and Non Res Projects - 40,001 – 100,000 sqft $19,827.00 Mailing costs included $24,298.06 0% $24,298.00 $4,471 17 Tier 2 Residential and Non Res Projects - 100,001+ sqft base fee $21,106.00 after base fee hours are depleated, project goes to hourly rate Mailing costs included $25,542.90 0% $25,542.00 $4,436 18 Tier 3 Residential and Non Res Projects - 100,001+ sqft base fee $20,752.00 after base fee hours are depleated, project goes to hourly rate Mailing costs included $24,710.93 0% $24,710.00 $3,958 19 Tier 4 Residential and Non Res Projects - Up to 10,000 sqft $11,615.00 Mailing costs included $14,029.08 0% $14,029.00 $2,414 20 Tier 4 Residential and Non Res Projects - 10,001 – 40,000 sqft $15,218.00 Mailing costs included $17,660.18 0% $17,660.00 $2,442 21 Tier 4 Residential and Non Res Projects - 40,001 – 100,000 sqft $22,305.00 Mailing costs included $26,874.41 0% $26,874.00 $4,569 22 Tier 4 Residential and Non Res Projects - 100,001 + sqft base fee plus $24,288.00 Mailing costs included $29,834.51 0% $29,834.00 $5,546 23 Environmental Review - Specific Plan Environmental Check List and Initial Study 30% Consultant costs, plus City administrative fee (30% of consultant cost) NA NA 30% $0 24 Environmental Review - Categorical Exemption $200.00 If not already included in fee $446.42 0% $446.00 $246 25 Environmental Review - Administrative Fee for consultant prepared environmental documents and special studies 30% Of Consultant cost NA NA 30% $0 26 Pre-Application Review Meeting with Staff $0.00 staff review and comments provided to applicant $4,382.14 100% $0.00 $0 27 Pre-Application Study Session with Planning Commission or Design Review Board $4,580.00 staff review and up to two public meetings $5,180.56 0% $5,180.00 $600 31 Agenda Packet Page 110 of 293

PLANNING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 28 Pre-Application Review by Staff $1,683.00 Multi-department review and written comments $1,921.19 0% $1,921.00 $238 29 General Plan and Zoning Ordinance30 General/Specific Plan and/or Amendment $22,131.00 each $27,817.86 0% $27,817.00 $5,68631 Zoning Amendment $22,131.00 each $27,817.86 0% $27,817.00 $5,686 32 Subdivisions and Lot Adjustments33 Tentative Parcel Map 1-4 lots $8,255.00 each $10,979.57 0% $10,979.00 $2,72434 Tentative Tract Map 5-10 lots $13,864.00 each $16,592.68 0% $16,592.00 $2,72835 Tentative Tract Map 11-25 lots $16,636.00 each $20,606.76 0% $20,606.00 $3,97036 Tentative Tract Map 26+ lots (base fee for 25 lot map + fee for additional lots over 25) $2,539.00 per lot $942.21 0% $942.00 -$1,597 37 Final Map 1-4 lots $8,547.00 each $7,665.78 0% $7,665.00 -$882 38 Final Map 5+ lots $9,718.00 each $10,409.24 0% $10,409.00 $69139 Exception to Subdivision Ordinance $11,442.00 each $6,023.93 0% $6,023.00 -$5,41940 Lot Line Adjustment or Lot Merger $8,547.00 each $7,552.34 0% $7,552.00 -$99541 Certificate of Compliance $7,134.00 each $7,063.70 0% $7,063.00 -$7142 Planned Development43 Planned Development $45,357.00 each $49,914.39 0% $49,914.00 $4,55744 Development Agreement $49,826.00 each $56,001.83 0% $56,001.00 $6,17545 Development Fees46 Incentives Program Permit (Staff and Design Review Board review prior to application for Planning Commissionaction, does not include Use Permit Fee) $13,190.00 each $15,892.10 0% $15,892.00 $2,702
47 Accessory Dwelling Unit Permit $367.00 each $950.42 0% $950.00 $583 48 SB 9 Compliance Review for Proposed New Units $1,727.00 each $2,209.14 0% $2,209.00 $48249 Home Occupation Permit $100.00 each $122.20 0% $122.00 $2250 Zoning Clearance (Commercial) $645.00 each $724.29 0% $724.00 $7951 Individual Business Sign Permit (as part of Master Sign Program) $100.00 each $98.67 1% $98.00 -$2 52 Preliminary Review of Multi-Story Single Family Construction (RAD) $1,727.00 each $1,561.45 0% $1,561.00 -$166 53 Unspecified or Research - hourly $256.00 per hour $237.61 0% $237.00 -$1954 Rebuild or Interpretation Letter $1,014.00 each $1,018.70 0% $1,018.00 $455 Fence Clearance $100.00 each $135.87 1% $135.00 $3556 Residential Chicken Clearance $100.00 each $98.67 1% $98.00 -$2 57 Honeybee Keeping Clearance $100.00 each $195.81 0% $195.00 $9558 Goat Weed Abatement Permit $100.00 each $98.67 1% $98.00 -$259 Unanimous Neighbor Consent Exception for Chickens and Bees $49.00 each $146.47 0% $146.00 $97
60 Zoning Information Form/Questionnaire $49.00 each $73.24 0% $73.00 $24 61 Permit Amendment/Time Extension 1/2 of current fee each NA NA 1/2 of current fee $062 Appeals - by non-applicant resident $608.00 each $7,745.51 92% $608.00 $063 Appeals - by applicant or non-resident 1/2 of current fee each NA NA 1/2 of current fee $064 Community Development Director $287.00 per hour $309.47 0% $309.00 $2265 Planning Manager $220.00 per hour $258.13 0% $258.00 $3866 Senior Planner $200.00 per hour $197.34 0% $197.00 -$367 Associate Planner $110.00 per hour $148.81 1% $148.00 $3868 Assistant Planner $101.00 per hour NA NA $101.00 $069 Massage Operator's Permit $612.00 each $425.88 0% $425.00 -$187 32 Agenda Packet Page 111 of 293

PLANNING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 70 Massage Operator's Permit Renewal New each $74.40 1% $74.00 NA71 Cannabis Operating Permit As needed to cover the cost of application Deposit account NA NA As needed to cover the cost of application $0 72 Inclusionary Zoning73 Inclusionary Zoning In-lieu Fee - 9 or more rental units $20.00 per habitable square foot NA NA $21.00 $174 Inclusionary Zoning In-lieu Fee - 10 or more "for sale" units $25.00 per habitable square foot NA NA $26.00 $1 75 Inclusionary Zoning In-lieu Fee for combined rental and "for sale" projects To be determined by City Staff based on square footage of each type To be determined by City Staff based on square footage of each type. NA NA To be determined by City Staff based on square footage of each type $0 76 Inclusionary Monitoring: Rental $1,687.00 annually per project NA NA $1,733.00 $077 Inclusionary Monitoring: Ownership $2,812.00 per project NA NA $2,888.00 $078 Inclusionary Housing Agreement $787.00 per project NA NA $808.00 $079 Design Review and Signs80 Residential - 1 unit $959.00 each $2,320.53 0% $2,320.00 $1,36181 Residential - Minor $959.00 each $1,278.89 0% $1,278.00 $31982 Residential - 2 - 4 units $3,474.00 each $4,398.23 0% $4,398.00 $92483 Residential - 5 - 10 units $5,763.00 each $7,683.00 0% $7,683.00 $1,92084 Residential - 11+ units $8,597.00 each $10,442.26 0% $10,442.00 $1,84585 Nonresidential - 1 - 2,500 s.f. $2,127.00 each $3,455.50 0% $3,455.00 $1,32886 Nonresidential - 2,501 - 10,000 s.f. $4,244.00 each $5,186.23 0% $5,186.00 $94287 Nonresidential - 10,000+ s.f. $7,421.00 each $9,920.62 0% $9,920.00 $2,49988 Administrative Design Review $2,127.00 each $2,294.80 0% $2,294.00 $16789 Permanent signs conforming to sign regulations $668.00 each $704.36 0% $704.00 $3690 Temporary signs $62.00 each $97.14 0% $97.00 $3591 Sidewalk Sign Permit (only) $62.00 each $97.14 0% $97.00 $3592 Variances93 Variance - Residential $5,468.00 each $5,947.49 0% $5,947.00 $47994 Variance - Nonresidential $8,247.00 each $8,533.09 0% $8,533.00 $28695 Miscellaneous96 Notice of Exemption Cost of filing with agency plus one hour of senior planner time each County Clerk Filing Fees NA NA
Cost of filing with agency plus one hour of senior planner time $0
97 Landscape Consultant or Design Consultant
Consultant costs, plus City administrative fee (30% of consultant cost) each NA NA
Consultant costs, plus City administrative fee (30% of consultant cost) $0
98 Document Library and Associated Fees99 Electronic Media-CD (of Plans etc.) $23.00 each $47.80 2% $47.00 $24100 Laserfiche/Archiving $3.00 per page/sheet $3.00 0% $3.00 $0101 Zoning Map $17.00 each $28.90 3% $28.00 $11102 General Plan Map $17.00 each $28.90 3% $28.00 $11103 Specific Plan $246.00 each $216.90 0% $216.00 -$30104 Urban Greening Plan $161.00 each $132.00 0% $132.00 -$29105 Active Transportation Plan $161.00 each $132.00 0% $132.00 -$29 33 Agenda Packet Page 112 of 293

PLANNING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 106 General Plan $56.00 each $46.00 0% $46.00 -$10107 Use Permits108 Use Permit Residential - 1 unit $2,239.00 each Projects deemed minor by Development Service Manager $3,619.17 0% $3,619.00 $1,380 109 Use Permit Residential - 2-4 units $3,751.00 each $5,495.70 0% $5,495.00 $1,744110 Use Permit Residential - 5-10 units $4,754.00 each $5,981.05 0% $5,981.00 $1,227111 Use Permit Residential - 11+ units $5,756.00 each $6,967.75 0% $6,967.00 $1,211112 Administrative Use Permit $1,236.00 each $1,292.64 0% $1,292.00 $56 113 Temporary Use Permit $1,124.00 each $1,215.30 0% $1,215.00 $91114 Address Asssignment Request $473.00 $555.74 0% $555.00 $82 Note: Fees are based on the City's Cost Allocation Study to cover the cost of processing applications for all projects. The Planning Manager may determine a project to be unusually complex or time consuming and require a deposit at the time of application for estimated staff, consultant, and City Attorney costs. If a standard fee has previously been paid, additional deposits may be required to cover extraordinary costs resulting from unforeseen complexities, delays or extra meetings. Hourly staff costs are based on employee wages and benefits, overhead, equipment and supervision, as determined by the City’s Cost Allocation Study. Charges for third-party consultants will equal actual contract costs plus 30% administrative charge. Fees for entitlements requiring a public hearing and other similar applications include one review of the initial application submittal and review of up to two resubmittals. Review of additional resubittals will incur additional fees based on staff time. 34 Agenda Packet Page 113 of 293

BUILDING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 MECHANICAL, ELECTRICAL, & PLUMBING (MEP Permit Issuance Fees)2 Permit Issuance Fee (applies to all MEP permits) $149.00 each permit $153.31 0% $153.00 $43 MECHANICAL PERMIT FEES4 Stand alone Mechanical Plan Check $260.00 per hour or fraction thereof $291.97 0% $291.00 $315 Minimum Mechanical Permit for Miscellaneous Work $87.00 each $191.66 0% $191.00 $1046 A/C (residential) $131.00 each $153.33 0% $153.00 $227 Furnaces (FAU, floor) $146.00 each $153.33 0% $153.00 $78 Heater (wall) $180.00 each $234.73 0% $234.00 $549 Appliance Vent/Chimney (only) $87.00 each $153.33 0% $153.00 $6610 Refrigeration Compressor $131.00 each $153.33 0% $153.00 $2211 Boiler - <2,000k BTU $146.00 each $153.33 0% $153.00 $712 Boiler - greater than 2,000k BTU $260.00 each $268.33 0% $268.00 $813 Chiller $131.00 each unit $153.33 0% $153.00 $2214 Central Heating System - New (includes duct, gas piping, electric, etc.) $260.00 each $268.33 0% $268.00 $815 Fan Coil Unit $87.00 each $115.00 1% $114.00 $2716 Heat Pump (package unit) $131.00 each $153.33 0% $153.00 $2217 Heater (unit, radiant, etc.) $180.00 each $115.00 1% $114.00 -$6618 Air Handler w/ducts more to 10k CFM $87.00 each $115.00 1% $114.00 $2719 Air Handler w/ducts more than 10k CFM $87.00 each $115.00 1% $114.00 $2720 Duct Work only each outlet/register $45.00 each $115.00 1% $114.00 $6921 Evaporative Cooler $87.00 each $115.00 1% $114.00 $2722 Make-up Air System $131.00 each $153.33 0% $153.00 $2223 Moisture Exhaust Duct (clothes dryer) $87.00 each $115.00 1% $114.00 $2724 Variable Air Volume Box (including duct work) $131.00 each $153.33 0% $153.00 $2225 Vent Fan (single duct) $87.00 each $115.00 1% $114.00 $2726 Vent System $131.00 each $153.33 0% $153.00 $2227 Exhaust Hood and Duct (residential) $87.00 each $115.00 1% $114.00 $2728 Exhaust Hood - Type I (commercial grease hood) $174.00 each $651.65 0% $651.00 $47729 Exhaust Hood - Type II (commercial steam hood) $131.00 each $191.66 0% $191.00 $6030 Non-Residential Incinerator $433.00 each $421.66 0% $421.00 -$1231 Refrigerator Condenser Remote $260.00 each $268.33 0% $268.00 $832 Walk-In Box/Refrigerator Coil $131.00 each $153.33 0% $153.00 $2233 New Mini Split Duct New $229.99 0% $229.00 NA34 New Mini Split Ductless New $191.66 0% $191.00 NA35 Other Mechanical Inspections (min.1/2 hr increments or fraction thereof) $214.00 per hour $191.66 0% $191.00 -$2336 PLUMBING / GAS PERMIT FEES37 Stand Alone Plumbing Plan Check $260.00 per hour or fraction thereof $291.97 0% $291.00 $3138 Minimum Plumbing Permit for Miscellaneous Work $87.00 each $191.66 0% $191.00 $10439 Fixtures (each three) $131.00 each 3 or fraction thereof $115.00 1% $114.00 -$1740 Gas System (one outlet) $131.00 one only $153.33 0% $153.00 $2241 Gas System (first five outlets) $174.00 first five $191.66 0% $191.00 $1742 Gas Outlets (each additional) $29.00 each above the first 5 $24.53 2% $24.00 -$543 Gas Test (stand alone or re-test) $131.00 each occurrence $115.00 1% $114.00 -$1744 Building Sewer $87.00 each $153.33 0% $153.00 $6645 Grease Trap $131.00 each $153.33 0% $153.00 $2246 Ejector Pump $131.00 each $153.33 0% $153.00 $22 35 Agenda Packet Page 114 of 293

BUILDING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 47 Backflow Preventer (first five) $131.00 first five $115.00 1% $114.00 -$1748 Backflow Preventer (>5) $29.00 each above the first 5 $76.66 1% $76.00 $4749 Roof Drain - Rainwater System $87.00 each $153.33 0% $153.00 $6650 Water Heater (new and replacements) $87.00 each $153.33 0% $153.00 $6651 Water Pipe Repair/Replacement per dwelling unit $174.00 each $115.00 1% $114.00 -$6052 Water Service $87.00 each $115.00 1% $114.00 $2753 Drain-Vent Repair/Alterations $87.00 each main or branch line $115.00 1% $114.00 $2754 Drinking Fountain $87.00 each $115.00 1% $114.00 $2755 Graywater Systems $174.00 each system $191.66 0% $191.00 $1756 Swimming Pool Piping and Gas $260.00 each pool $268.33 0% $268.00 $857 Medical Gas System (each outlet) $260.00 each outlet $268.33 0% $268.00 $858 Sump Pump $131.00 each $191.66 0% $191.00 $6059 Private Storm Drainage System (each inlet) $87.00 each inlet $115.00 1% $114.00 $2760 Other Plumbing and Gas Inspections (min. 1/2 hr increments or fraction thereof) $214.00 per hour $191.66 0% $191.00 -$2361 ELECTRICAL PERMIT FEES62 Stand Alone Electrical Plan Check $260.00 per hour or fraction thereof $291.97 0% $291.00 $3163 Minimum Electrical Permit for Miscellaneous Work $87.00 each $191.66 0% $191.00 $10464 Single Phase Service (per 100 amps) $87.00 per 100 amps $153.33 0% $153.00 $6665 Three Phase Service (per 100 amps) $131.00 per 100 amps $153.33 0% $153.00 $2266 Electrical Subpanel with subfeed $87.00 each $153.33 0% $153.00 $6667 Electrical Main Panel Upgrade $232.86 $268.32 0% $268.00 $3568 Any amp circuit first 20 $87.00 first twenty circuits $191.66 0% $191.00 $10469 Any amp circuit each additional 20 $15.00 each add'l circuit > 20 $115.00 1% $114.00 $99 70 Temporary Service $87.00 each $115.00 1% $114.00 $2771 Temporary Pole $87.00 each $115.00 1% $114.00 $2772 Light Poles Commercial - first $366.00 first pole $191.66 0% $191.00 -$17573 Light Poles Commercial - additional $87.00 each add'l pole after the first $115.00 1% $114.00 $2774 Pre-Inspection/consultation $131.00 each $191.66 0% $191.00 $6075 Swimming Pool/Spa $175.00 each $191.66 0% $191.00 $1676 Solar Photovoltaic Repairs $131.00 each $191.66 0% $191.00 $6077 Generator Installation - Residential $400.00 each $344.99 0% $344.00 -$5678 Generator Installation - Commercial $581.00 each $344.99 0% $344.00 -$23779 Electrical Outlets (receptable & light fixture) $140.00 first ten $115.00 1% $114.00 -$2680 Electrical Outlets (each additional) $15.00 each add'l outlet after 1st 10 $15.33 2% $15.00 $081 Whole house rewires New $268.32 0% $268.00 NA82 Other Electrical Inspections (min. 1/2 hr increments or fraction thereof) $214.00 per hour or fraction thereof $191.66 0% $191.00 -$23 36 Agenda Packet Page 115 of 293

BUILDING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 83 MISC BUILDING PERMIT FEES FOR PROJECTS NOT REQUIRING PLAN REVIEWS84 Standard per hour rate for items not specifically covered in the fee schedule $178.00 $254.55 0% $254.00 $7685 Earthquake mitigation inspection first hour $308.00 $306.64 0% $306.00 -$286 Earthquake mitigation inspection per hour after the first hour $178.00 $191.66 0% $191.00 $1387 Fire permit handling fee $119.00 $153.31 0% $153.00 $3488 Building permit renewal when within one year after expiration date 50% of original building fee NA NA 50% of original building fee $0 89 Building permit renewal when after one year after expiration date 100% of original building fee NA NA 100% of original building fee $0 90 Building permit re-inspection fee after 2 failed inspections of the same item(s) $178.00 $254.55 0% $254.00 $7691 Building permit re-inspection fee when nobody is on site for the inspection and it has not been cancelled ahead of the inspector’s leaving the office. $178.00 $254.55 0% $254.00 $76 92 Emergency non-scheduled emergency inspection call-out: per hour with a 4-hour minimum $178.00 $237.68 0% $237.00 $5993 Pre-arranged or scheduled after hours inspection paid in advance: per hour with a 2-hour minimum $178.00 $391.01 0% $391.00 $21394 Research – per half hour or fraction thereof $89.00 $223.42 0% $223.00 $13495 Building Permit Extension $178.00 $318.61 0% $318.00 $14096 Building Permit Revision: per hour $178.00 $339.19 0% $339.00 $16197 Additional plan review by consultant after the third re-check Consultant Cost plus 30% NA NA Consultant Cost plus 30% $0 98 Additional plan review by City staff after 3rd re-check: per hour $225.00 $210.58 0% $210.00 -$1599 Soils review processing by City staff $119.00 $153.31 0% $153.00 $34100 Soils peer review by consultant Consultant Cost plus 30% NA NA Consultant Cost plus 30% $0 101 FEMA flood zone review $662.00 $1,019.19 0% $1,019.00 $357102 New or replacement Certificate of Occupancy $296.00 $391.12 0% $391.00 $95103 Temporary Certificate of Occupancy: per 30-day period $296.00 $391.12 0% $391.00 $95104 ELECTRIC VEHICLE CHARGERS105 Residential electric vehicle level 1 or 2 charging station per each $301.00 NA NA $301.00 $0106 MINOR REPAIRS AND ALTERATIONS107 Miscellaneous minor bathroom/kitchen repair – 1 fixture only $362.00 $383.31 0% $383.00 $21108 Miscellaneous minor repairs who PC and less than $10,000 valuation $362.00 $383.31 0% $383.00 $21109 RE-ROOFS110 Miscellaneous roof repairs not exceeding 500 sq.ft. $362.00 sq.ft. = square feet min. = minimum $191.65 0% $191.00 -$171111 Residential re-roof not exceeding 1,500 sq.ft. $479.00 sq.ft. = square feet min. = minimum $613.30 0% $613.00 $134112 Each additional 100 sq.ft. residential re-roof exceeding 1,500 sq.ft. $15.00 sq.ft. = square feet min. = minimum $12.27 2% $12.00 -$3113 Commercial NOT exceeding 5,000 sq.ft. $653.00 sq.ft. = square feet min. = minimum $459.97 0% $459.00 -$194114 RE-ROOFS115 Commercial exceeding 5,000 sq.ft. $913.00 $574.98 0% $574.00 -$339116 SIDING AND STUCCO117 Siding new or replacement - any square footage $393.00 $383.31 0% $383.00 -$10118 Stucco new or replacement $479.00 $459.97 0% $459.00 -$20119 Each additional 400 sq.ft. stucco or fraction thereof over 400 sq.ft. $119.00 $153.33 0% $153.00 $34120 WINDOWS AND DOORS – NON-STRUCTURAL121 Door replacement not involving alterations to wall framing or exterior wall coverings $155.00 $153.33 0% $153.00 -$2122 Window, sliding door, solar tube replacement – one only and no alterations to framing or exterior wall coverings $226.00 $268.31 0% $268.00 $42123 Multiple window, sliding door, solar tube replacements – first 5 with no alterations to framing or exterior wall coverings and all done at the same time $480.00 $306.64 0% $306.00 -$174 124 Multiple window, sliding door, solar tube replacements – each additional 5 or fraction thereof above the first 5 with no alterations to framing or exterior wall coverings and all done at the same time $87.00 $229.98 0% $229.00 $142 37 Agenda Packet Page 116 of 293

BUILDING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 125 RENTAL HOUSING INSPECTIONS126 Rental Housing Inspection: Single Family per unit $296.00 $334.86 0% $334.00 $38127 Rental Housing Inspection: Multi-family first unit $260.00 $267.51 0% $267.00 $7128 Rental Housing Inspection: Multi-family additional units after the first $148.00 $152.86 1% $152.00 $4129 Rental Housing Inspection: Reinspection after the first reinspection $89.00 $76.43 1% $76.00 -$13130 Rental Housing Inspection: cancellation with less than 72-hour notice 50% of fee assessed NA NA 50% of fee assessed $0131 Rental Housing Inspection: late payment 10% of fee billed NA NA 10% of fee billed $0132 OTHER MISCELLANEOUS FEES AND ASSESSMENTS133 Document imaging of plans, calculations, and other supporting documents $3.00 page $3.00 0% $3.00 $0134 Continuing education $5.00 permit NA NA $5.00 $0135 Planning plan review when required 20% of combined building inspection and plan review with a NA NA
20% of combined building inspection and plan review with a $0
136 Public Works review when required
20% of combined building inspection and plan review with a NA NA
20% of combined building inspection and plan review with a $0
137 Fire Department plan review when required See Fire fee schedule NA NA See Fire fee schedule $0138 SPA Specific Plan maintenance fee – Construction of new residential units (per unit) $206.00 unit NA NA $206.00 $0139 SPA Specific Plan maintenance fee – New non-residential buildings and additions to existing non-residential buildings (per newly created sq.ft) $0.19 sq.ft. NA NA $0.19 $0 140 General Plan Update Fee New % of Building Permit 2.4% 0% 2.4% NA 141 MISC BUILDING PERMIT FEES FOR PROJECTS REQUIRING A PLAN REVIEW142 MISCELLANEOUS PROJECTS143 Standard Hourly Rate $199.00 $199.04 0% $199.00 $0144 Antenna - residential HAM or CB $695.00 $777.42 0% $777.00 $82145 Equipment Container/Building (Prefab) / Residemtial Elevators $1,006.00 $892.40 0% $892.00 -$114146 Free-standing cellular building, antenna, and building site $1,409.00 $1,096.35 0% $1,096.00 -$313147 New cellular antenna and supporting equipment added to existing site $359.00 $470.75 0% $470.00 $111148 Light pole or telephone pole mounted cellular 5G equipment $230.00 $191.66 0% $191.00 -$39149 Awning or Canopy $514.00 $394.09 0% $394.00 -$120150 Commercial Coach (per unit) $671.00 $470.76 0% $470.00 -$201151 Commercial Vapor Recovery Systems $653.00 $624.09 0% $624.00 -$29152 Demolition – whole or partial when exterior walls are removed $381.00 $355.77 0% $355.00 -$26153 Demolition surcharge when PCB mitigation is involved $275.00 $317.43 0% $317.00 $42154 Flagpole $407.00 $432.43 0% $432.00 $25155 ACCESSORY STRUCTURES156 Accessory Structure/Storage shed – unfinished interior and no MEP $645.00 $700.75 0% $700.00 $55157 Carport not exceeding 400 sq.ft. $732.00 $624.09 0% $624.00 -$108158 New Garage (detached or attached) (unfinished inside and only 1 electrical circuit) $905.00 $892.42 0% $892.00 -$13 38 Agenda Packet Page 117 of 293

BUILDING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 159 ACCESSORY DWELLING UNITS160 New attached or detached accessory dwelling units – each 300 sq.ft. or fraction thereof. Includes 1 kitchen and 1 bathroom. $1,649.00 New or conversion accessory dwelling units employing Universal Design will receive a 25% discount off the above ADU fees. $1,541.08 0% $1,541.00 -$108
161 Conversion of existing space into an accessory dwelling unit – each 300 sq.ft. or fraction thereof. Includes 1 kitchen and 1 bathroom. $1,187.00 New or conversion accessory dwelling units employing Universal Design will receive a 25% discount off the above ADU fees. $1,203.92 0% $1,203.00 $16
162 ALTERATIONS/ADDITIONS/REPAIRS163 Room additions of 300 sq. ft. or less without engineered calculations without a kitchen or bathroom $1,193.00 $1,150.92 0% $1,150.00 -$43164 Room addition of 300 sq. ft. or less with engineered calculations without a kitchen or bathroom $1,271.00 $1,150.92 0% $1,150.00 -$121165 Room additions per additional 100 sq.ft. > 300 sq.ft. with or without engineered calculations. $318.00 $344.99 0% $344.00 $26166 Residential remodel 300 sq. ft. or less without kitchen or bathroom remodel $957.00 $805.92 0% $805.00 -$152167 Each additional 100 sq. ft. of residential remodel > 300 sq.ft. $167.00 $191.66 0% $191.00 $24168 Kitchen or bathroom remodel $756.00 $767.58 0% $767.00 $11169 Each additional kitchen or bathroom remodel when work is done at the same time as the first $378.00 $344.99 0% $344.00 -$34170 New bathroom or kitchen added to existing dwelling or new/existing accessory structure $780.00 $844.26 0% $844.00 $64171 New or remodel commercial bathroom $1,110.00 $1,081.09 0% $1,081.00 -$29172 Miscellaneous bathroom/kitchen repair involving only 1 fixture with plan review $345.00 NA NA $345.00 $0173 Foundation repair (non-engineered) of 100 linear feet or less $625.00 $614.26 0% $614.00 -$11174 Foundation repair (engineered) of 100 linear feet or less $843.00 $614.26 0% $614.00 -$229175 Each additional 100 lin. ft. foundation repair (engineered or non- engineered) exceeding the first 100 l.f.. $178.00 $191.66 0% $191.00 $13176 Commercial and residential interior partitions not exceeding 30 linear feet $476.00 $537.60 0% $537.00 $61177 Each additional 30 lin. ft. of partition exceeding first 30 l.f. $114.00 $115.00 1% $114.00 $0178 New masonry fireplace when allowed by BAAQMD $796.00 $844.26 0% $844.00 $48179 Pre-fabricated metal fireplace that is EPA compliant $666.00 $537.60 0% $537.00 -$129180 Fireplace demolition $476.00 $384.27 0% $384.00 -$92181 Miscellaneous minor and structural repairs, alterations, dry rot/termite repairs of $10,000 valuation or less and requiring plan review $758.00 $517.23 0% $517.00 -$241 182 Dry rot/termite damage, miscellaneous alterations, and structural repairs of greater than $10,000 valuation must use Valuation Table as for new construction.183 Residential Drainage - French Drain/Sump Pump $407.00 $422.61 0% $422.00 $15184 Building permit fees include inspection and permit issuance.185 Plan review fees 65% of the building permit fees and are in addition to the building permit fee NA NA 65% $0
186 The fees below are per each occurrence or unit unless otherwise noted and include any associated plumbing, electrical, and/or mechanical work.187 PROJECT TYPES188 DECKS, BALCONIES, PATIOS, PORCHES189 New decks and balconies not exceeding 100 sq.ft. $614.00 $547.42 0% $547.00 -$67190 New decks and balconies not exceeding 500 sq.ft. $863.00 $700.75 0% $700.00 -$163191 Each additional 100 sq. ft. of new deck or balcony exceeding 500 sq. ft. $266.00 $145.66 0% $145.00 -$121192 Deck and balcony repairs of 100 sq. ft. or less $435.00 $470.76 0% $470.00 $35193 Deck and balcony repairs of greater than $10,000 valuation must use the Valuation Table as for new construction.194 Covered porch $504.00 $537.60 0% $537.00 $33195 Patio or deck cover – wood or metal frame not exceeding 300 sq.ft. $512.00 $537.60 0% $537.00 $25196 Each additional 300 sq.ft. of patio or deck cover exceeding 300 sq.ft. $157.00 $153.33 0% $153.00 -$4197 Patio room constructed of wood or metal frame not exceeding 300 sq.ft. $764.00 $767.59 0% $767.00 $3198 Each additional 300 sq.ft. of patio room exceeding the first 300 sq.ft. $371.00 $191.66 0% $191.00 -$180199 ELECTRIC VEHICLE CHARGING 39 Agenda Packet Page 118 of 293

BUILDING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 200 Commercial electric vehicle charging station – one only $625.00 $575.94 0% $575.00 -$50201 Each Commercial EV charging station when 2 to 4 are installed at the same site $316.00 $498.32 0% $498.00 $182202 Each Commercial EV charging station when 5 or more installed at the same site $210.00 $574.99 0% $574.00 $364203 FENCES204 Fences or free-standing non-masonry walls 7 to 10 ft. high and not exceeding 100 linear feet $445.00 $422.61 0% $422.00 -$23205 Each additional 100 lin. ft. of 6 to 10 feet high non-masonry fences or free- standing walls exceeding the first 100 lin. ft. $139.00 $115.00 1% $114.00 -$25 206 Fences or free-standing masonry walls less than 10 feet high and not exceeding 100 linear feet $905.00 $882.59 0% $882.00 -$23207 Each additional 100 lin. ft. of less than 10 feet high masonry free-standing fences or walls exceeding the first 100 lin. ft. $166.00 $191.66 0% $191.00 $25 208 RETAINING WALLS209 Retaining Wall: Standard Design Non-Engineered not exceeding 50 linear feet $586.00 $460.93 0% $460.00 -$126210 Each additional 50 l.f. non-engineered retaining wall exceeding 50 l.f. $144.00 $115.00 1% $114.00 -$30211 Retaining Wall: Engineered 3-10' High not exceeding 50 linear feet $991.00 $690.93 0% $690.00 -$301212 Each additional 50 l.f. eng. 3’-10’ high retaining wall exceeding 50 l.f. $199.00 $115.00 1% $114.00 -$85213 Retaining Wall: Engineered over 10' High retaining wall not exceeding 50 l.f. $1,271.00 $844.26 0% $844.00 -$427214 Each additional 50 l.f. eng. over 10’ high retaining wall exceeding 50 l.f. $279.00 $153.33 0% $153.00 -$126215 ROOFS216 Roof structure replacement not exceeding 100 sq.ft. $476.00 $422.61 0% $422.00 -$54217 Each additional 100 sq.ft. roof structure replacement exceeding 100 sq.ft. $108.00 $115.00 1% $114.00 $6218 SEISMIC IMPROVEMENT219 Engineered or non-engineered seismic retrofit/structural strengthening $616.00 $652.60 0% $652.00 $36220 Engineered or non-engineered seismic retrofit/structural strengthening when using Planset A or conforming to Existing Building Code appendix chapter A3 $308.00 $499.27 0% $499.00 $191 221 SIGNS222 Structural Signs such as monument or large signs attached to a building, etc. $616.00 $652.60 0% $652.00 $36223 Non-structural signs such as individual lettering attached to building, etc. $407.00 $422.61 0% $422.00 $15224 Additional fee for each illuminated sign $86.00 $115.00 1% $114.00 $28225 SOLAR ENERGY & BATTERY STORAGE226 Solar Photovoltaic up to 15 kW $450.00 NA NA $450.00 $0227 Solar PV each 15KW or fraction thereof over 15 kW, Plus $15 per kW for each kW over 15 kW $276.00 NA NA $276.00 $0228 Solar Thermal (solar water heating) up to 30 kWth $331.00 $344.98 4% $331.00 $0229 Solar Thermal each 30kWth or fraction thereof over first 30 kWth $165.00 $191.65 14% $165.00 $0230 Residential battery storage systems $287.00 NA NA $287.00 $0231 STORAGE RACKS232 Storage Racks: 0-5' high not exceeding 100 l.f. $407.00 $422.61 0% $422.00 $15233 Storage Racks: Greater than 5 feet and up to 8 feet high not exceeding 100 l.f. $476.00 $422.61 0% $422.00 -$54234 Storage Racks: Greater than 8 feet high and not exceeding 100 l.f. $586.00 $499.27 0% $499.00 -$87235 Each additional 100 l.f. of storage regardless of height $144.00 $115.00 1% $114.00 -$30236 SWIMMING POOLS, SPAS, HOT TUBS, SAUNAS237 Prefabricated Spa or Hot Tub $411.00 $345.94 0% $345.00 -$66238 Sauna or Steam Room added to existing or new/addition construction $552.00 $575.94 0% $575.00 $23239 Swimming Pool - Residential $732.00 $729.26 0% $729.00 -$3240 Swimming Pool – Commercial not exceeding 800 sq. ft. $1,566.00 $1,419.25 0% $1,419.00 -$147241 Each additional 100 sq. ft. commercial pool exceeding 800 sq. ft. $180.00 $191.66 0% $191.00 $11242 TENANT IMPROVEMENTS243 Office tenant improvements – minimum for T.I. not exceeding 500 sq. ft. $2,010.00 $1,817.17 0% $1,817.00 -$193244 Each additional 100 sq. ft. or fraction thereof of office T.I. exceeding 500 sq.ft. $175.00 $178.82 0% $178.00 $3 40 Agenda Packet Page 119 of 293

BUILDING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 245 Retail tenant improvements – minimum for T. I. not exceeding 500 sq. ft. $2,169.00 $1,817.17 0% $1,817.00 -$352246 Each additional 100 sq.ft. or fraction thereof retail T.I. exceeding 500 sq.ft. and not exceeding 25,000 sq. ft. $127.00 $140.49 0% $140.00 $13247 Each additional 100 sq.ft. or fraction thereof retail T.I. exceeding 25,000 sq.ft. $61.00 $45.71 2% $45.00 -$16248 Restaurant tenant improvement – minimum for T.I. not exceeding 750 sq.ft. $2,751.00 $2,277.16 0% $2,277.00 -$474249 Each additional 100 sq.ft. or fraction thereof restaurant T.I. exceeding 750 sq.ft. $224.00 $198.76 0% $198.00 -$26250 WINDOWS, SKYLIGHTS, DOORS251 New door cut into an existing wall $357.00 $383.31 0% $383.00 $26252 First replacement window or sliding glass door -structural with exterior surface break-out and/or frame modification $356.00 $383.31 0% $383.00 $27 253 Each additional replacement structural window or sliding glass door when work is performed at the same time as the first $70.00 $130.32 0% $130.00 $60 254 Skylights: New or replacement not exceeding 10 sq.ft. $264.00 $384.27 0% $384.00 $120255 Skylights: New or replacement and/or structural exceeding 10 sq.ft. $340.00 $422.61 0% $422.00 $82256 ADDITIONAL FEES - OTHER MANDATED BUILDING PERMITS257 Construction Tax, ECMC 4.36.010 for new construction and additions 1/2 or 1% of permit value % of total permit fee SMIP, CBSC, and STMP Fees are collected by, but not set by the City NA NA 1/2 or 1% of permit value $0 258 Art in Public Places, ECMC 13.50 for projects $250,000 or more 1% of project cost NA NA 1% of project cost $0259 Calif. Strong Motion Instrumentation Program260 Category 1 Construction (1 to 3 Story Residential) const. value x .00013 (.50 minimum) NA NA const. value x .00013 $0261 Category 2 (OVER 3 story Residential and ALL Commercial) const. value x .00028 (.50 minimum) NA NA const. value x .00028 $0262 Calif. Building Standards Commission263 $1 - $25,000 Permit Valuation $1.00 NA NA $1.00 $0264 $25,001 - $50,000 $2.00 NA NA $2.00 $0265 $50,001 - $75,000 $3.00 NA NA $3.00 $0266 $75,001 - $100,000 $4.00 NA NA $4.00 $0267 Every $25,000 or fraction above $100,000 Add $1 NA NA Add $1 $0268 West Contra Costa Transportation Advisory Committee, Subregional Transportation Mitigation Program (STMP)** UPDATED FEES FOR FY2025-2026 269 single family residential $6,964.00 per dwelling unit NA NA $6,908.00 -$56270 multi-family residential $3,431.00 per dwelling unit NA NA $3,404.00 -$27271 senior housing $1,881.00 per dwelling unit NA NA $1,866.00 -$15272 Hotel $4,457.00 per room NA NA $4,421.00 -$36273 Retail $8.44 per square foot NA NA $8.37 $0274 Office $11.17 per square foot NA NA $11.08 $0275 industrial $7.12 per square foot NA NA $7.06 $0276 storage facility $0.98 per square foot NA NA $0.97 $0277 Other* (as determined by Public Works) $9,411.00 per AM peak hour trip Notes: *Applies to development projects that do not clearly conform to one of the defined residential or nonresidential categories and is likely to be applicable only in exceptional cases. In such cases, consult the STMP Administrative Guidelines.

NA NA $9,336.00 -$75
278 **STMP & TIF are increased yearly based on the San Francisco region February ENR Construction Cost Index (SFCCI) increase as compared to the prior February rate. Accessory Dwelling Units (ADU) are not required to pay STMP & TIF fees.279 Transportation Impact Fee (TIF)280 RESIDENTIAL281 Single Family $4,172.00 per dwelling unit NA NA $4,172.00 $0282 Multi-Family $2,920.30 per dwelling unit NA NA $2,920.30 $0283 NONRESIDENTIAL284 Commercial $5.62 per square foot NA NA $5.62 $0 41 Agenda Packet Page 120 of 293

BUILDING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 285 Hotel/Motel $4.59 per square foot NA NA $4.59 $0286 Office $4.84 per square foot NA NA $4.84 $0287 Industrial $3.05 per square foot NA NA $3.05 $0288 Other* to be determined Note: * Applies to development projects that do not clearly conform to one of the defined residential or nonresidential categories and is likely to be applicable only in exceptional cases. In such cases, consult the Transportation Impact Fee Administrative Guidelines.

NA NA to be determined $0
289 Penalty: Violations for Construction and Debri: 290 First Violation New NA NA $100.00 NA291 Second Violation New NA NA $500.00 NA292 Third Violation New NA NA $1,000.00 NA 42 Agenda Packet Page 121 of 293
Minimum Value Maximum Value
Current Base Rate
Suggested Base Rate
Current Plus $$
Suggested Plus $$ For every
$1 $800 $141.68 $145.82 $0.00 $0.00 $0
$801 $3,000 $141.68 $145.82 $12.59 $12.99 $100
$3,001 $38,000 $419.32 $431.57 $55.79 $57.43 $1,000
$38,001 $75,000 $2,372.17 $2,441.46 $41.29 $42.45 $1,000$75,001 $150,000 $3,898.11 $4,011.97 $28.26 $29.08 $1,000 $150,001 $750,000 $6,017.48 $6,193.25 $22.60 $25.12 $1,000$750,001 $1,500,000 $20,663.03 $21,266.60 $19.17 $18.25 $1,000 $1,500,001 $10,000,000 $33,963.28 $34,955.35 $16.42 $16.90 $1,000 $10,000,001 and up $173,536.48 $178,605.50 $7.34 $7.55 $1,000 Percent Change = 3%
Cost Recovery Level = 100%

NEW CONSTRUCTION AND OTHER FEES BASED ON VALUATION
The following table is used to calculate permit (Issuance and Inspection) fees based on the valuation of all new residential, commercial, and industrial construction either not covered in or referenced by the Miscellaneous Building Permit Fee table. Valuation will be determined by the 1997 UBC Valuation Table and adjusted by the S.F.

Bay Area Engineering News Record Construction Cost Index increase from 1997 to June 2023 or by actual contract price when the type of construction is not represented in the Valuation Table. Plan review is additional and is calculated at 65% of the established permit fee. Plan Review Fee for modular/factory built housing is charged at 10% less than the Plan Review fee for site-built projects. 43 Agenda Packet Page 122 of 293
Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft

3.3% New per/sqf 3.3% New per/sqft 3.3% New per/sqft 3.3% New per/sqft Type I-A or II-A* 279.85 9.32 289.17
Type V-B - Wood
Frame 236.44 7.87 244.32 Type I-A or II-A 298.12 9.93 308.04 Type III-A 250.15 8.33 258.48 Type V-A Masonry (or
Type III) 227.31 7.57 234.88
Type V-B- Wood
Frame (Engrd) 260.43 8.67 269.10 Type II-A 218.16 7.26 225.43 Type III -B 241.01 8.03 249.03 Type V-B - Wood
Frame 210.17 7.00 217.17 Type V-B - Masonry 247.87 8.25 256.12 Type II -B 207.89 6.92 214.81 Type V-A 228.44 7.61 236.05 Type I Basement
Garage 95.95 3.20 99.15 Basements 0.00 0.00 0.00 Type III-A 230.73 7.68 238.42 Type V-B 219.31 7.30 226.61 Type V-A 229.58 7.65 237.23 Semi Finished 59.40 1.98 61.38 Type III -B 219.31 7.30 226.61 Unfinished 45.69 1.52 47.21 Type V-A 217.02 7.23 224.25 Type V-B 207.89 6.92 214.81
Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft

3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf Type I or II-A 268.42676 8.94 277.37 Type I-A or II-A 293.55 9.78 303.33 Type I-A or II-A* 306.12 10.19 316.31 Type I-A & B 285.56 9.51 295.07 Type II-B 194.17316 6.47 200.64 Type II -B 181.62 6.05 187.67 Type IIA 236.44 7.87 244.32 Type II-A 194.17 6.47 200.64 Type III -A 204.15615 6.80 210.95 Type III-A 211.31 7.04 218.35 Type II -B 225.02 7.49 232.51 Type III-A 207.88 6.92 214.80 Type III -B 164.04889 5.46 169.51 Type III -B 202.18 6.73 208.91 Type III-A 255.86 8.52 264.38 Type III -B 199.88 6.66 206.54 Type V-A 195.30759 6.50 201.81 Type V-A 197.60 6.58 204.18 Type III -B 238.73 7.95 246.68 Type V-A 195.31 6.50 201.82 Type V-B 182.75667 6.09 188.84 Type V-B 187.33 6.24 193.57 Type V-A 230.73 7.68 238.41 Type V-B 186.17 6.20 192.37 Type V-B 222.73 7.42 230.15
Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft

3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf Type I-A or II-A* 379.25 12.63 391.88 Type I-A or II-A 266.14 8.862 275.00 Type I-A or II-A* 274.40 9.14 283.54 Type II -B 172.47 5.74 178.21 Type II-A 279.98 9.32 289.30 Type II-A 266.14 8.862 275.00 Type II-A 182.93 6.09 189.03 Type III-A 179.33 5.97 185.30 Type II -B 271.06 9.03 280.08 Type II -B 206.74 6.885 213.63 Type II -B 175.13 5.83 180.96 Type V-A 153.06 5.10 158.16 Type III-A 308.40 10.27 318.67 Type III-A 225.02 7.493 232.51 Type III-A 198.55 6.61 205.16 Canopies 71.96 2.40 74.35 Type III -B 298.12 9.93 308.05 Type III -B 215.88 7.189 223.07 Type III -B 189.63 6.31 195.94 Type V-A 279.84 9.32 289.16 Type V-A 217.02 7.227 224.25 Type V-A 185.17 6.17 191.33 Type V-B 267.28 8.90 276.18 Type V-B 210.17 6.999 217.17 Type V-B 175.13 5.83 180.96 Type V-B 175.13 5.83 180.96
Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft

3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf Type II-A 130.21811 4.34 134.55 Type I-A or II-A 249.31 8.30 257.62 Type V-B - Wood
Frame 59.40 1.98 61.38 Type I-A or II-A* 211.31 7.04 218.35 Type II -B 122.2203 4.07 126.29 Type III-A 215.26 7.17 222.43 Type V-B - Masonry: 64.50 2.15 66.65 Type II-A 129.07 4.30 133.37 Type III-A 142.77812 4.75 147.53 Type III -B 213.60 7.11 220.71 Carport 35.40 1.18 36.58 Type II -B 126.79 4.22 131.01 Type III -B 132.49364 4.41 136.91 Type V-A 195.32 6.50 201.82 Type III-A 157.62 5.25 162.87 Type V-A 95.95136 3.20 99.15 Type V-B 191.89 6.39 198.28 Type III -B 147.35 4.91 152.25 Type V-A 132.50 4.41 136.92
Type V-B 122.22 4.07 126.29
Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft

3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf Type I-A or II-A 254.71 8.48 263.20 Type I-A or II-A 146.20 4.87 151.07 Type I-A or II-A* 316.00 10.52 326.52 Type I-A or II-A 280.98 9.36 290.34 Type II-A 190.75 6.35 197.11 Type II -B 93.66 3.12 96.78 Type II-A 255.54 8.51 264.05 Type III-A 204.46 6.81 211.27 Type II -B 182.63 6.08 188.71 Type III-A 111.94 3.73 115.66 Type II -B 244.13 8.13 252.26 Type III -B 195.23 6.50 201.73 Type III-A 207.89 6.92 214.81 Type III -B 105.09 3.50 108.59 Type III-A 265.80 8.85 274.65 Type V-A 193.04 6.43 199.47 Type III -B 198.75 6.62 205.37 Tilt-Up 76.53 2.55 79.08 Type III -B 256.68 8.55 265.22 Type V-B 182.76 6.09 188.84 Type V-A 194.18 6.47 200.64 Type V-A 105.09 3.50 108.59 Type V-A 242.99 8.09 251.08 Type V-B 182.76 6.09 188.84 Type V-B 95.95 3.20 99.15 Type V-B 235.00 7.83 242.82

BUILDING VALUATION TABLE DATA
Fore referrence only the following building valuation data are based on the 1997 Uniform Building Code and adjusted with 1.33 S.F. Bay Area modifier based on ENR construction cost index 1997-2025 FY 2025-26 FY 2025-26 FY 2025-26 FY 2025-26
Incr/Decr Incr/Decr Incr/Decr Incr/Decr
APARTMENT BUILDINGS (R-2
OCC) DWELLINGS R-3 OCC) LIBRARIES (A-3 OCC) RESTAURANTS (A-2, B OCC) FY 2025-26 FY 2025-26 FY 2025-26 FY 2025-26
Incr/Decr Incr/Decr Incr/Decr Incr/Decr
BANKS (B OCC) CARE FACILITIES (R-4, R-2, R-3.1
OCC) OFFICES (B OCC)** SERVICE STATIONS (Special
OCC)
AUDITORIUMS (A-3 OCC) FIRE STATIONS (Essential
Services) MEDICAL OFFICES (B OCC) SCHOOLS (E OCC)
FY 2025-26 FY 2025-26 FY 2025-26 FY 2025-26
Incr/Decr Incr/Decr Incr/Decr Incr/Decr
FY 2025-26
Occupancy/Type per/sqft Incr/Decr Incr/Decr Incr/Decr Incr/Decr FY 2025-26 FY 2025-26 FY 2025-26
CHURCHES (A-3 OCC) INDUSTRIAL, FACTORIES (F-1, F2 OCC) PUBLIC BUILDINGS (A-3, B OCC) THEATERS (A-1 OCC) BOWLING ALLEYS (A-3 OCC) HOTELS AND MOTELS (R-1 OCC) PRIVATE GARAGES (U OCC) STORES (M OCC) Occupancy/Type per/sqft
FY 2025-26 FY 2025-26 FY 2025-26 FY 2025-26
Incr/Decr Incr/Decr Incr/Decr Incr/Decr
44 Agenda Packet Page 123 of 293

BUILDING VALUATION TABLE DATA
Fore referrence only the following building valuation data are based on the 1997 Uniform Building Code and adjusted with 1.33 S.F. Bay Area modifier based on ENR construction cost index 1997-2025 Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft

3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf Type I-A or II-A* 356.38 11.87 368.24 Type I-A or II-A 407.78 13.58 421.36 Type I-A or II-A* 120.82 4.02 124.84 Type I-A or II-A 126.78 4.22 131.00 Type II-A 247.87 8.25 256.12 Type III-A 372.36 12.40 384.76 Type I-A or II-B Open
Parking* 90.06 3.00 93.06 Type V-A 75.38 2.51 77.89
Type III-A 253.58 8.44 262.02 Type V-A 279.85 9.32 289.16 Type II -N 70.03 2.33 72.36 Type II-B or V-B 70.82 2.36 73.18 Type V-A 238.73 7.95 246.68 Type III 1-Hour 91.16 3.04 94.19 Type III-A 84.53 2.81 87.34 Type III -N 81.28 2.71 83.98 Type III -B 81.09 2.70 83.79 Type V 1-Hour 83.46 2.78 86.24
* Add 0.5 percent to total cost for each story over 3
** Deduct 20 percent for shell only buildings
*** Deduct 11 percent for mini-warehouses
FY 2025/26 Note: Increases are based on the Engineering News Record Construction Cost Index increase for the San Francisco Bay Area as of April 2025.

FY 2025-26
Incr/Decr Incr/Decr Incr/Decr Incr/Decr
CONVALESCENT HOSPITALS (I-2
OCC) JAILS PUBLIC GARAGES (S2) WAREHOUSES (S1, S2)***
Occupancy/Type per/sqft
FY 2025-26 FY 2025-26 FY 2025-26
45 Agenda Packet Page 124 of 293

PUBLIC WORKS
Item No. Title Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 1 Grading2 Plan Check3 50 to 10,000 CY (no permit required below 50 CY) $581.00 each $913.40 0% $913.00 $3324 10,001 to 100,000 CY $807.00 each $1,108.21 0% $1,108.00 $3015 Add for each 10,000 CY above 100,000 $193.00 10,000 CY $328.97 0% $328.00 $1356 Permit Issuance $120.00 each $232.23 0% $232.00 $1127 Permit Bond $5.74 per CY NA NA $5.91 $08 Inspection (C.6 inspections separately listed in "Erosion & Clean Water Section") (No permit required below 50 CY) 9 50 to 10,000 CY (up to 8 inspections; any additional inspections will be charged at hourly rate) $1,041.00 each $1,462.87 0% $1,462.00 $421 10 10,001 to 100,000 CY (up to 15 inspections, add'l inspections will be charged at hourly rate) $2,095.00 each $2,536.12 0% $2,536.00 $441 11 Add for each 10,000 CY above 100,000 $129.00 10,000 CY $231.56 0% $231.00 $10212 Grading Work Started Prior to Obtaining a Permit Double the Plan Check, Permit Issuance Fee and Inspection Fee NA NA Double the Plan Check, Permit Issuance Fee and Inspection Fee $0 13 Encroachments14 Permit Issuance Fee (all permits except planting of street trees) $120.00 each $183.53 0% $183.00 $6315 Permit Renewal Fee/Time Extension or Sub-Permit $60.00 each $91.76 1% $91.00 $3116 Permit bond/deposit (except street tree permit)17 One-year maintenance bond for 25 sf street cuts for the amount of the value of the work or as determined by City Engineer. $1,945.00 minimum $4,674.38 0% $4,674.00 $2,729 18 Bond for concrete work, including curb, gutter and sidewalk drains.

Deposit is equal to the value of the work for up to 40 sf or as determined by City Engineer. Deposit is returned upon passing final inspection for concrete work. $823.00 minimum $3,392.38 0% $3,392.00 $2,569
19 One-year maintenance bond for storm drainage modifications equal to the value of the work or as determined by City Engineer. minimum 20 Permit Types (also subject to the Issuance Fee (#2)21 Concrete Flat Work or Under Sidewalk Drain - up to 500 s.f. (includes two inspections) $331.00 each $404.35 0% $404.00 $73 22 ADD for each add'l 500 s.f. $79.00 500 s.f. $174.00 0% $174.00 $9523 Street cut or drainage modifications (< 10 C.Y. excavated) (includes two inspections) $360.00 each $404.35 0% $404.00 $44 24 ADD for each add'l 10 CY. $268.00 10 CY $178.43 0% $178.00 -$9025 Traffic Control Plan Review $297.00 each $512.49 0% $512.00 $21526 Work in Public Right-of-Way Started Prior to Obtaining a Permit Double the Permit Issuance Fee and Inspection Fee NA NA Double the Permit Issuance Fee and Inspection Fee $0 27 Revocable Encroachment Permit/Hold Harmless Agreement $425.00 each $484.60 0% $484.00 $5928 Storage in Public ROW for Moving Pods and Portable Toilets (East Bay Sanitary dumpsters exempt; storage pods for residential moving exempt from bond deposit) $91.00 per one week $125.30 0% $125.00 $34
29 Moratorium Street Restoration Fee for Street cuts not exceeding 5' x 5'; Restoration for street cuts larger than 5' x 5' on a moratorium street will be calculated by the City Engineer based on recent bid costs for annual City slurry seal projects $847.00 each $974.00 0% $974.00 $127
46 Agenda Packet Page 125 of 293

PUBLIC WORKS
Item No. Title Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 30 Re-inspection/Additional Inspection (for reasons such as work not ready for a scheduled inspection, work done without an inspection, work partially completed or annual permit inspection) $91.00 each $241.08 0% $241.00 $150
31 Traffic Striping Restoration -Thermoplastic Pavement Legends (includes removal and replacement and related contract work) $370.00 each $300.00 0% $300.00 -$70 32 Traffic Striping Restoration -Thermoplastic 4" Line (includes removal and replacement and related contract work) $9.18 LF $4.80 17% $4.00 -$5 33 Traffic Striping Restoration -Thermoplastic 12' Line (includes removal and replacement and related contract work) $6.88 LF $12.00 0% $12.00 $5 34 Traffic Striping Restoration -Thermoplastic Detail 22 (includes removal and replacement and related contract work) $4.59 LF $6.00 0% $6.00 $1 35 Pavement Marker Restoration - Caltrans Type AY Pavement Reflective Markers (includes replacement and related contract work) $9.18 each $48.00 0% $48.00 $39 36 Utility Pole - Set, Relocate or Remove $321.00 each $512.49 0% $512.00 $19137 Temporary Construction Parking for vehicles that have commercial license plates and Limited Construction Equipment Storage (includes construction parking permit) $298.00 per week $241.08 0% $241.00 -$57
38 Transportation Permit - Per Calif. State Vehicle Code Section 35795 $16.00 per trip NA NA $16.00 $039 Haul Route Impact Fees40 For qualifying projects as determined by the City Engineer, Haul Route Fees are charged on the following costs per square yard of pavement per PCI point drop in each 500-foot long section of haul route. For haul routes in use for over one year, a PCI discount will be applied against the PCI change as listed below. If the Post-construction PCI is higher than the Pre-construction PCI, the PCI change shall be considered to be zero. The final PCI value will determine the category of the fee charged. 41 Arterial42 100<pci<70 $0.35 NA NA $0.36 $0.0143 69<pci<50 $0.99 NA NA $1.02 $0.0344 49<pci<25 $1.01 NA NA $1.04 $0.0345 24<pci<0 $1.78 NA NA $1.83 $0.0546 Collector 47 100<pci<70 $0.35 NA NA $0.36 $0.0148 69<pci<50 $0.82 NA NA $0.84 $0.0249 49<pci<25 $1.01 NA NA $1.04 $0.0350 24<pci<0 $1.78 NA NA $1.83 $0.0551 Residential52 100<pci<70 $0.27 NA NA $0.28 $0.0153 69<pci<50 $0.77 NA NA $0.79 $0.0254 49<pci<25 $0.92 NA NA $0.95 $0.0355 24<pci<0 $1.53 NA NA $1.58 $0.0556 PCI Discount57 100<pci<70 2.2 pts/year NA NA 2.2 pts/year $058 69<pci<50 2.7 pts/year NA NA 2.7 pts/year $059 49<pci<25 3.3 pts/year NA NA 3.3 pts/year $060 24<pci<0 3.6 pts/year NA NA 3.6 pts/year $061 Parking Controls 47 Agenda Packet Page 126 of 293

PUBLIC WORKS
Item No. Title Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ Red curb marking next to residential driveway (Subject to City Engineer approval of Resident Request) $429.00 each $515.00 0% $515.00 $86 64 Temporary No Parking/Stopping Anytime Signs (Encroachment Permit Issuance Fee also applies) $8.00 each $8.00 0% $8.00 $0 65 Temporary Barricades66 Pick-up/drop-off by City crew $152.00 per pick-up/drop-off $179.78 0% $179.00 $2767 Replacement $117.00 per barricade $100.00 0% $100.00 -$1768 Street Tree Permits69 Street Tree Planting by Property Owner (Includes planting permit, site approval, and planting inspection) $59.00 per 1-3 trees $533.37 0% $533.00 $474 70 Street Tree Maintenance Bond - Required three-year refundable maintenance bond for when property owner plants new Street Trees to cover Staff time needed to rehabilitate or remove a tree that has not been properly maintained. $112.00 per tree, refundable after 3- year health verification $177.79 0% $177.00 $65 71 New Street Tree Planting and Related Work by City (Includes permit, one 15-gallon tree, planted, staked, and mulched, and comes with watering bag. Requires signed City Tree Care Agreement) $354.00 per tree $1,306.96 0% $1,306.00 $952
72 Concrete Removal for Tree Well $219.00 per 16 s. f. $655.58 0% $655.00 $43673 Concrete Removal for Tree Well (per s.f. after first 16 s.f. removal) $14.00 per s.f. $25.00 0% $25.00 $1174 Maintenance to Establish New Tree - Three-year maintenance fee when City is establishing new tree without a City Tree Care Agreement, usually in case of mitigation for street tree removal and planting in a different location that the responsible property owner is not able to maintain. $917.00 per tree $1,266.96 0% $1,266.00 $349
75 Vegetation removal by City $75.00 per 24 sq ft or less $775.02 0% $775.00 $700 48 62 Appeal of No Parking/Stopping Anytime Zones $632.00 each $1,115.71 0% $1,115.00 $1963 Agenda Packet Page 127 of 293

PUBLIC WORKS
Item No. Title Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 76 Street Tree Replacement by City (replace existing street tree with a suitable street tree subject to City approval) New minimum $773.58 0% $773.00 NA 77 Permit for Street Tree Pruning or Removal by Property Owner or Utility Company (includes inspection by Program Manager) $236.00 minimum $355.58 0% $355.00 $119 78 Bond for Street Tree Pruning, Protection, or Removal by Property Owner or Utility Company $286.00 minimum NA NA $294.58 $9 79 Violation for Unauthorized Street Tree Pruning, Mutilation or Removal (i.e., work without a Permit) 80 0-5.99 inch $520.00 Tree Diameter @ 4.5 feet NA NA $535.60 $16 81 6.0-11.99 inch $780.00 Tree Diameter @ 4.5 feet NA NA $803.40 $2382 12.0-17.99 inch $1,040.00 Tree Diameter @ 4.5 feet NA NA $1,071.20 $3183 18.0-23.99 inch $1,560.00 Tree Diameter @ 4.5 feet NA NA $1,606.80 $4784 24 inch and greater $2,080.00 Tree Diameter @ 4.5 feet NA NA $2,142.40 $6285 Erosion and Clean Water86 Stormwater Pollution Prevention Construction Permit: C.6 Inspections (Permits for construction projects that require Stormwater Pollution Prevention, includes monthly inspection) 87 Less than 1-acre hillside site, requiring an erosion and sediment control plan $368.00 $484.60 0% $484.00 $116 88 More than an acre, requiring an erosion and sediment control plan $736.00 $850.32 0% $850.00 $11489 Re- Inspections (Due to Fail in maintaining BMP's) $183.00 $493.45 0% $493.00 $31090 C.3 Fees for projects which create or replace more than 10,000 square feet of impervious surface 91 Stormwater Control Plan Review/Approval (Collected by Planning Dept at initial submittal) $587.00 each $718.59 0% $718.00 $131 92 Operations & Maintenance Plan Review/Approval (O&M Plan to include Maintenance Agreement and description of annual inspection fees) (Collected by Building Dept at plan check submittal) $0.05 per square feet of impervious surface $582.00 0% $582.00 $582 93 Annual Inspection Fee-Collected by Public Works Department as described in Maintenance Agreement (Includes max of one field inspection. Additional re-inspection will be charged additional inspection fee) $481.00 up to 25,000 sf $696.02 0% $696.00 $215
94 Annual Inspection Fee-Collected by Public Works Department as described in Maintenance Agreement $962.00 more than 25,000 sf $1,159.14 0% $1,159.00 $197 95 Miscellaneous96
Illicit Discharge Response / Hazardous Materials Spill Clean-Up - costs to include supervision, reporting, overhead, equipment, hourly wages and fringe benefits of the employees involved $1,417.00 per response, per day $1,910.97 0% $1,910.00 $493 49 Agenda Packet Page 128 of 293

PUBLIC WORKS
Item No. Title Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 97 Public Works Hourly Rates (for other Services Not Specified) 98 Public Works Director $339.00 hourly $359.04 0% $359.00 $2099 Management Assistant $120.00 hourly $116.45 0% $116.00 -$4100 Engineering Manager/Senior Engineer $254.00 hourly NA NA $261.62 $8101 Operations + Environmental Services Division Manager $243.00 hourly $225.44 0% $225.00 -$18102 Programs Manager/Analyst $236.00 hourly $166.19 0% $166.00 -$70103 Associate Engineer $198.00 hourly $194.81 0% $194.00 -$4104 Operations Supervisor $236.00 hourly $152.25 0% $152.00 -$84105 Technician/Inspector $183.00 hourly $134.16 0% $134.00 -$49106 Maintenance Worker / Recycling Maintenance Worker $152.00 hourly $103.66 1% $103.00 -$49107 Admin Clerk Specialist $100.00 hourly $99.15 0% $99.00 -$1108 Environmental Specialist $156.00 hourly $133.10 0% $133.00 -$23109 Bid Protest Fee $608.00 $1,340.59 0% $1,340.00 $732110 Recycling + Environmental Services111 Construction Waste Management Plan Review Fee $250.10 per plan review, inclusive of pre plan and post report $363.82 0% $363.00 $113 112 Solid Waste Collection and Disposal Subscription Exemption Application Fee $312.00 per application $665.50 0% $665.00 $353 113 Recycling + Environmental Resource Center Tour Fee $156.00 per tour, excluding free monthly tours $99.15 0% $99.00 -$57 114 Citywide Garage Sale Listing $25.00 per registration $66.55 61% $25.75 $1115 Solid Waste Event Stands Rental (set of three - Recycling, Compost, and Garbage) $57.00 per event $225.44 0% $225.00 $168 Note: Hourly rates are based on the City's Cost Allocation Study. The Public Works Director may determine a permit application to be unusually complex or time consuming and use consultants for review and inspection. Charges for consultants will equal actual contract costs plus 30% administrative charge 50 Agenda Packet Page 129 of 293

PUBLIC WORKS
Item No. Title Current Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 116 Solid Waste Event Stand Replacement $83.00 per stand $135.00 0% $135.00 $52117 Compact Fluorescent Bulb (CFL) and LED Bulb Recycling * $4.00 per bulb NA NA $4.12 $0118 Fluorescent Tube Recycling * $0.72 per linear foot NA NA $0.74 $0119 CFL & Tube Large Quantity (over 15 CFLs and/or 30 feet) Recycling $14.00 additional flat fee NA NA $14.42 $0120 Sharps Disposal* $4.00 per disposal NA NA $4.12 $0121 Pharms Disposal* $4.00 per disposal NA NA $4.12 $0122 Cardboard, Paper, Books, Magazines, and Newspaper Recycling Dropoff - for amounts greater than 1 cubic yard (~26 bankers boxes) ** (minimum charge $8)
$8.00 per cubic yard NA NA $8.24 $0
Note: Citywide Fees apply. Credit Card Transaction Fees are per transaction.*No cost for residents in RecycleMore service area. Proof of residency required** No cost for El Cerrito rate payers. City reserves the right to reject large quantities. Proof of residency required***Includes market rate sale of salvaged materials plus processing fee 51 Agenda Packet Page 130 of 293
FIRE
Item No. Title
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 1 Occupancy Inspection Fees2 Fire Safety Inspection: Annual Inspection plus one (1) re-inspection $319.07 Each $611.42 41% $361.00 $423 Educational Inspection-Public Schools (Group E): Annual Inspection plus one (1) re-inspection N/A Each $115.63 100% N/A $04 Educational Inspection-Private Schools (Group E): Annual Inspection plus one (1) re-inspection $335.30 Each $346.89 0% $346.00 $115 Hotels & Apartments (Group R-1): < 15 Units Annual Inspection plus one (1) re-inspection $210.91 Each $578.15 0% $578.00 $3676 Hotels & Apartments (Group R-1): 15-99 Units Annual Inspection plus one (1) re-inspection $502.94 Each $553.59 0% $553.00 $507 Hotels & Apartments (Group R-1): 100-249 Units Annual Inspection plus one (1) re-inspection $659.78 Each $830.39 0% $830.00 $1708 Hotels & Apartments (Group R-1): 250 or more Units Annual Inspection plus one (1) re-inspection $854.46 Each $1,107.19 0% $1,107.00 $2539 Residential (R-3) Single Family Requested Fire Safety Inspection N/A Each NA NA N/A $010 Day Care (Group R-3): Annual Inspection plus one (1) re-inspection $335.30 Each $231.26 0% $231.00 -$10411 Additional Reinspections $221.73 Each $115.63 1% $115.00 -$10712 Operational Permits & Inspection Fees13 Assembly Permit: Requires Fire Safety Inspection $104.92 Each $276.80 0% $276.00 $17114 Christmas Tree Lot Operation Permit $335.30 Each $276.80 0% $276.00 -$5915 Compressed Gas Permit: Requires Occupancy Inspection $104.92 Each $115.63 1% $115.00 $1016 Demolition Permit: Includes pre and post inspections $670.59 Each $553.59 0% $553.00 -$11817 Dry Cleaning Permit: Requires Fire Safety Inspection $104.92 Each $115.63 1% $115.00 $1018 Fire Alarm Annual Inspection: Requires Occupancy Inspection $104.92 Each $276.80 29% $195.50 $9119 Food Booth Permit $335.30 Each $276.80 0% $276.00 -$5920 Hood & Duct Annual Inspection: Requires Fire Safety Inspection $104.92 Each $276.80 0% $276.00 $17121 Model Rocket Permit N/A Each NA NA N/A $022 Repair Garage Permit: Requires Occupancy Inspection $104.92 Each $231.26 15% $195.50 $9123 Open Burning Permit: Residential N/A Each NA NA N/A $024 Sprinkler & Standpipe Annual Inspection: Requires Occupancy Inspection $104.92 Each $231.26 0% $231.00 $12625 Membrane Structure, Tent or Canopy Permit $341.79 Each $553.59 0% $553.00 $21126 Welding & Cutting Permit: Requires Occupancy Inspection $104.92 Each $231.26 0% $231.00 $12627 Miscellaneous No- Action Permits N/A Each NA NA N/A $028 Plan Review29 Preliminary Plan Review: Residential Remodel (1-2 family units) $436.97 Each $914.72 0% $914.00 $47730 Preliminary Plan Review: Residential/ADU (1-2 family units) $573.25 Each $609.81 0% $609.00 $3631 Preliminary Plan Review: Commercial (including multi-family/apartment/condo/townhouse) $791.73 Each $914.72 0% $914.00 $12232 New Construction Plan Check & One Site Inspection (< 4999 sq. ft.) $554.86 Each $914.72 0% $914.00 $35933 New Construction Plan Check & Site Inspection (>5000 sq. ft., each add'l 1000 sq. ft.) $219.56 Each $304.91 0% $304.00 $8434 Additional Site Inspections $210.91 Each $276.80 0% $276.00 $6535 Fire Alarm System Plan Review: First 25 Devices $436.97 Each $609.81 0% $609.00 $17236 Fire Alarm System Plan Review: each additional 25 Devices or Portion Thereof $136.28 Each $304.91 0% $304.00 $16837 Fire Alarm System On Site Inspection: First 25 Devices $354.76 Each $415.19 0% $415.00 $6038 Fire Alarm System Inspection: each additional 25 Devices or Portion Thereof $136.28 Each $276.80 29% $195.50 $5939 Hood & Duct Plan Review and One Field Inspection $491.05 Each NA NA $491.05 $0 52 Agenda Packet Page 131 of 293
FIRE
Item No. Title
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 40 Medical Gas Plan Review and One Field Inspection $491.05 Each $231.26 0% $231.00 -$26041 Sprinkler System Plan Review: Residential- First 25 Heads (New or Modify 1 -2 family units) $436.97 Each $914.72 0% $914.00 $47742 Sprinkler System Plan Review: Residential- Each Additional 25 Heads (New or Modify) $218.48 Each $304.91 0% $304.00 $8643 Sprinkler Systems Field Inspections Residential: Rough in & Final - First 25 heads $354.76 Each $553.59 0% $553.00 $19844 Sprinkler Systems Field Inspections Residential: Rough in & Final - Each Additional 25 heads $136.28 Each $276.80 29% $195.50 $5945 Sprinkler System Plan Review: Commercial (New)- First 25 Heads (includes multi-family) $655.45 Each $914.72 0% $914.00 $25946 Sprinkler System Plan Review: Commercial (New)- Each Additional 25 Heads or Portion Thereof $218.48 Each $304.91 0% $304.00 $8647 Sprinkler Systems Field Inspections Commercial: First 25 heads $573.25 Each $830.39 0% $830.00 $25748 Sprinkler Systems Field Inspections Commercial: Each Additional 25 heads $210.91 Each $276.80 0% $276.00 $6549 Underground Review and Inspection $136.28 Each $231.26 0% $231.00 $9550 Standpipe System Plan Review & Inspection $763.61 Each $346.89 0% $346.00 -$41851 Additional Risers $136.28 Each $231.26 0% $231.00 $9552 Fire Pumps & Related Equipment Plan Review and Two Field Inspections (Acceptance) $491.05 Each $346.89 0% $346.00 -$14553 Hydrant Water Flow Test for Sprinkler Calculations (per Test) $210.91 Each $462.52 0% $462.00 $25154 Emergency Responder Radio Communication System (ERRCS) Plan Review & Inspection $491.05 Each $914.72 0% $914.00 $42355 Vegetation Management56 Vegetation Management Parcel Inspection - First Inspection N/A Each $138.40 100% N/A $057 Additional Inspections $136.28 Each $276.80 29% $195.50 $5958 Vegetation Abatement Fees Actual Cost + 10% Each NA NA Actual Cost + 10% $0 59 Court Fees
Actual Cost + 10% Each NA NA Actual Cost + 10% $0
60 CERT Classes61 CPR Classes - El Cerrito & Kensington Residents $59.49 Each NA NA $59.49 $062 First Aid - El Cerrito & Kensington Residents $59.49 Each NA NA $59.49 $063 CPR Classes - Non- Residents $70.30 Each NA NA $70.30 $064 First Aid - Non-Residents $70.30 Each NA NA $70.30 $065 False Alarms66 1st False Alarm N/A Each NA NA N/A $067 2 or Over False Alarms in 12 months New Each NA NA $300.00 NA 53 Agenda Packet Page 132 of 293
FIRE
Item No. Title
Current
Fee/Charge Unit Full Cost Subsidy % Suggested Fee Fee Δ 68 Fire Department Hourly Rates69 Fire Apparatus Response or Standby Charge per hour (Engine) $432.64 Per Hour $611.42 0% $611.00 $17870 Fire Apparatus Response or Standby Charge per hour (Truck) $540.80 Per Hour $611.42 0% $611.00 $7071 Fire Apparatus Response or Standby Charge per hour (Command) $216.32 Per Hour $304.91 0% $304.00 $8872 Fire Investigation per hour (plus costs) $429.40 Per Hour $304.91 0% $304.00 -$12573 Fire Chief - ST $218.48 Per Hour $344.53 0% $344.00 $12674 Fire Chief - OT $327.72 Per Hour $516.80 0% $516.00 $18875 Battalion Chief - Training - ST $138.44 Per Hour $304.91 0% $304.00 $16676 Battalion Chief - Training - OT $207.67 Per Hour $152.45 0% $152.00 -$5677 Battalion Chief - ST $144.93 Per Hour $304.91 0% $304.00 $15978 Battalion Chief - OT $217.40 Per Hour $457.36 0% $457.00 $24079 Captain-Fire Prevention - ST $136.28 Per Hour $276.80 0% $276.00 $14080 Captain-Fire Prevention - OT $204.42 Per Hour $415.19 0% $415.00 $21181 Captain-Paramedic - ST $128.71 Per Hour $255.35 0% $255.00 $12682 Captain-Paramedic - OT $192.52 Per Hour $383.02 0% $383.00 $19083 Captain - ST $117.89 Per Hour $235.83 0% $235.00 $11784 Captain - OT $176.30 Per Hour $117.91 1% $117.00 -$5985 Engineer/Paramedic - ST $113.57 Per Hour $218.12 0% $218.00 $10486 Engineer/Paramedic - OT $170.89 Per Hour $327.18 0% $327.00 $15687 Engineer - ST $104.92 Per Hour $194.98 1% $194.00 $8988 Engineer - OT $157.91 Per Hour $97.49 1% $97.00 -$6189 Firefighter/Paramedic - ST $76.79 Per Hour $186.18 0% $186.00 $10990 Firefighter/Paramedic - OT $114.65 Per Hour $279.27 0% $279.00 $16491 Firefighter - ST $59.49 Per Hour $161.10 0% $161.00 $10292 Firefighter - OT $88.69 Per Hour $241.65 0% $241.00 $15293 Fire Executive Assistant - ST $62.73 Per Hour $115.63 1% $115.00 $5294 Fire Executive Assistant - OT $94.10 Per Hour $173.44 0% $173.00 $7995 SB 38 INSPECTION $252.45 Per Hour $304.91 0% $304.00 $52 54 Agenda Packet Page 133 of 293
POLICE
Item No. Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Services & Fees2 Fingerprinting, Solicitor or other (plus Department of Justice Fees*) $51.00 per set NA NA $51.00 $0 3 Citation Sign-offs—Resident $0.00 per citation $40.65 100% $0.00 $04 Citation Sign-offs—Non-Resident $26.00 per citation $40.65 38% $25.00 -$15 VIN Verification $53.04 per verification $81.29 32% $55.00 $2 6 Alcohol Beverage Control One Day License $53.04 per letter $119.06 54% $55.00 $27 False Alarm Response (1st incident) $0.00 each NA NA $0.00 $08 False Alarm Response (2nd through 5th incident) $95.68 each NA NA $95.00 -$19 False Alarm Response (6th and subsequent incidents) $205.92 each NA NA $205.00 -$110 Non-permitted Alarms $137.28 each NA NA $137.00 $011 Vehicle Removal/Vehicle Release Fee [Towed vehicles
abandoned or stored on a public street and vehicles towed pursuant to 14602.6; 14607.6; 22651(b),(d), (e), or (h) through (r); 22651.3, 22651.5, 22651.5 (a); 22652.5;22658; 22660; or 22669 of the California Vehicle Code] $171.60 per release $236.66 0% $236.00 $64
12 DUI Cost Recovery Fee* ($1,000 maximum) Actual cost to max per 30 min increments NA NA Actual cost to max $0 13 Firearm Storage Fee $27.04 initial NA NA $27.00 $014 Firearm Storage Fee $1.04 per day NA NA $1.00 $015 Weapons Seizure, Storage & Return $214.24 each $405.07 46% $220.00 $616 Reports, Photocopies & Records17 Clearance Letter $27.04 each NA NA $27.00 $018 Report Copy $7.28 $8.00 0% $8.00 $119 Traffic Collision Report Copy $7.28 per report $8.00 0% $8.00 $120 Police Photographs, audio tapes & videotapes & CDs $37.44 actual cost + fee $46.93 15% $40.00 $3 21 Permits22 Concealed Weapons Permit (plus Department of Justice Fees*) $410.00 each Determined by State $725.65 0% $725.00 $315 23 Peddler/Solicitor Permit $448.24 each $298.94 0% $298.00 -$15024 Permit to Sell Firearms—Initial Permit $391.04 each $453.17 12% $400.00 $925 Permit to Sell Firearms—Annual Renewal $192.40 each $221.82 10% $200.00 $826 Second-Hand Dealer's Permit $551.20 each $298.94 0% $298.00 -$253 55 Agenda Packet Page 134 of 293
POLICE
Item No. Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 27 Bingo Permit $237.12 each $144.71 0% $144.00 -$9328 Alarm Permit - Residential and Commercial $36.40 each $51.29 22% $40.00 $429 Alarm Permit Renewal $20.80 each $25.64 22% $20.00 -$130 Block Party Permit $50.96 each $119.06 58% $50.00 -$131 Parade Permit $328.64 each actual cost + fee $2,420.28 86% $330.00 $1 32 Street Closure Permit $90.48 each $222.72 60% $90.00 $033 Police Department Hourly Rates34 Police Chief -ST $234.71 hourly $373.67 0% $373.00 $13835 Police Chief - OT $351.52 hourly $560.50 0% $560.00 $208 36 Police Captain - ST $228.22 hourly $279.95 0% $279.00 $5137 Police Captain - OT $341.79 hourly $419.93 0% $419.00 $7738 Police Lieutenant - ST $199.01 hourly $308.46 0% $308.00 $10939 Police Lieutenant - OT $297.44 hourly $462.69 0% $462.00 $16540 Police Sergent/Investigations Assignment-ST $163.32 hourly $264.74 0% $264.00 $10141 Police Sergent/Investigations Assignment-OT $244.44 hourly $397.11 0% $397.00 $15342 Police Corporal - ST $129.79 hourly $189.94 0% $189.00 $5943 Police Corporal - OT $194.69 hourly $94.97 1% $94.00 -$10144 Police Officer - ST $84.36 hourly $162.59 0% $162.00 $7845 Police Office - OT $126.55 hourly $243.88 0% $243.00 $11646 Records Supervisor - ST $96.26 hourly $142.84 1% $142.00 $4647 Records Supervisor - OT $144.93 hourly $214.26 0% $214.00 $6948 Police Executive Assistant - ST $55.16 hourly $102.58 1% $102.00 $4749 Police Executive Assistant - OT $83.28 hourly $153.87 1% $153.00 $7050 Senior Records Specialist- ST $74.63 hourly $97.03 0% $97.00 $2251 Senior Records Specialist - OT $112.49 hourly $145.55 0% $145.00 $3352 Police Records Specialist - ST $60.57 hourly $93.86 1% $93.00 $3253 Police Records Specialist - OT $91.94 hourly $140.79 1% $140.00 $4854 Cadet - ST $24.88 hourly $103.66 1% $103.00 $7855 Cadet - OT $37.86 hourly $51.83 2% $51.00 $1356 Parking Violation Fines57 Obstruction or interference with Officers $104.00 11.12.020 NA NA $104.00 $058 Barriers & Signs $98.80 11.28.040b NA NA $100.00 $159 City Parking Lot $78.00 11.40.020 NA NA $80.00 $260 Parking on Sidewalk or Curb Prohibited $76.96 11.40.030 NA NA $80.00 $361 Vehicle Storage-Parking in excess of 72 hours $86.32 11.40.050a NA NA $80.00 -$662 Vehicle Storage-Trailer Parked on Street Overnight $78.00 11.40.050c NA NA $80.00 $2 56 Agenda Packet Page 135 of 293
POLICE
Item No. Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 63 Vehicle Storage-Parking for the purpose of engaging in vehicle sale $68.64 11.40.050d NA NA $80.00 $11 64 Parking for Certain Purposes-On Street for Sale $102.96 11.40.060a NA NA $80.00 -$2365 Parking for Certain Purposes-on Street for Repairs $86.32 11.40.060b NA NA $80.00 -$666 Parking for Certain Purposes-on Street when charging for washing/polishing $86.32 11.40.060c NA NA $80.00 -$6 67 Parking Regulations in Certain Zones $86.32 11.40.070 NA NA $80.00 -$668 Angle and Parallel Parking Signs-Loading Clearance between Vehicle and Street $78.00 11.40.080b NA NA $80.00 $2 69 Angle and Parallel Parking Signs-Loading Clearance between other Street $78.00 11.40.090a NA NA $80.00 $2 70 Loading and Unloading-Angle to Curb $78.00 11.40.090b NA NA $80.00 $271 Grades-Wheels not Turned $86.32 11.40.100 NA NA $80.00 -$672 Emergency Parking Signs $78.00 11.40.130b NA NA $80.00 $273 Curb Markings $78.00 11.40.160b NA NA $80.00 $274 Bus Zone $260.00 11.40.190e NA NA $260.00 $075 Parking-Limited Time $78.00 11.40.210 NA NA $80.00 $276 Parking-Prohibited during Certain Hours $78.00 11.40.230 NA NA $80.00 $277 Parking-Prohibited at all Times $78.00 11.40.240 NA NA $80.00 $278 Parking on Private Property $78.00 11.44.040 NA NA $80.00 $279 Violations Designated-4 Hour Permit Parking $99.84 11.68.050a NA NA $100.00 $080 Any ECMC parking violation not listed above shall be subject to a civil penalty $78.00 NA NA $80.00 $2 81 Curfew Violation Fines82 Daytime (8:00 am - 2 pm) 1st offense $66.00 NA NA $66.00 $0 83 Daytime (8:00 am - 2 pm) 2nd offense within one year $131.00 NA NA $131.00 $084 Daytime (8:00 am - 2 pm) 3rd offense within one year of 2nd offense $260.00 NA NA $260.00 $0 85 Nighttime (10:00 pm - 5 am) 1st Offense $68.00 NA NA $68.00 $0 57 Agenda Packet Page 136 of 293

RECREATION
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 1 Facility Rentals2 Community Center
Minimum Rental Time (Fri-Sun); 5 Hours
Maximum Advance Reservation: 12 Months Resident, Non-Profit or CoSponsored Group; 10 Months NonResident or Commercial; 12 months Annual Rentals. 3 Social Hall4 Resident (includes Skylight Room, Kitchen and Courtyard) $222.00 per hour NA NA $231.00 $95 Additional Hours for Set-Up & Clean-Up (max. 3 hours) 25% per hour discount of rental fee NA NA 25% $06 Deposit (credit card only) $701.00 per event NA NA $600.00 -$1017 Deposit (credit card only) - With Alcohol New per event NA NA $850.00 NA8 Alcohol Service Permit $228.00 per event $150.89 9% $138.00 -$909 Application Fee New per application $115.68 14% $100.00 NA10 Skylight, Garden and Patio Rooms11 Resident $85.00 per hour NA NA $89.00 $412 Deposit (credit card only) $121.00 per event NA NA $126.00 $513 Pool View Room/Courtyard14 Resident $46.00 per hour NA NA $48.00 $215 Deposit (credit card only) $125.00 per event NA NA $130.00 $516 Kitchen Use $63.00 per hour NA NA $66.00 $317 Group Picnic Areas18 Cerrito Vista19 Reservation—Resident $245.00 per day NA NA $245.00 $020 Arlington (large group area with tables & BBQ)21 Spaces 4 & 5—Resident $182.00 per day NA NA $190.00 $822 Spaces 4, 5 & 6—Resident $245.00 per day NA NA $255.00 $1023 Other Parks, picnic tables with BBQ pit24 Resident $100.00 per day NA NA $104.00 $425 Other Parks, picnic tables without BBQ pit26 Resident $85.00 per day NA NA $89.00 $427 Picnic Area Cleaning Deposit $60.00 per day NA NA $63.00 $328 Hana Gardens Senior Center29 Combined Room - Resident $112.00 per hour NA NA $117.00 $530 Alcohol Service Permit $58.00 per event $57.84 1% $57.00 -$131 Deposit $271.00 per event NA NA $282.00 $1132 Clubhouses Minimum Rental Time (Sat-Sun); 3 hours
Maximum Advance Reservation: 12 Months Resident, Non-Profit or CoSponsored Group; 10 Months NonResident or Commercial; 12 Months Annual Rentals 33 Private, Resident $90.00 per hour NA NA $94.00 $434 Renovated Clubhouse Private, Resident $112.00 per hour NA NA $117.00 $535 Deposit $271.00 per event NA NA $282.00 $1136 Alcohol Service Permit $58.00 per event $57.84 1% $57.00 -$1 58 Agenda Packet Page 137 of 293

RECREATION
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 37 Art Studio Instructor $49.00 per hour NA NA $51.00 $238 Facility & Rental Related Fees & Discounts39 Transfer Fee - Rooms and Clubhouses $60.00 per date NA NA $63.00 $340 Transfer Fee - Picnics $25.00 per date NA NA $26.00 $141 Late Payment Fee 15% percent NA NA 15% $042 City Co-Sponsored Rental Fee Discount 40% percent NA NA 40% $043 Non-Profit Rental Fee Discount 20% percent NA NA 20% $044 Governmental Agency/School District Rentals (unless specified in separate agreements) Additional Direct Costs (if needed) per event NA NA Additional Direct Costs (if needed) $0 45 Business Hours Facility Rental Discount (Mon. - Thurs. 8:30am - 4:30pm, no holidays) 15% per hour NA NA 15% $0 46 Chair Rental—Non-Profit/Co-Sponsored $6.00 each NA NA $7.00 $1 47 Table Rental—Non-Profit/Co-Sponsored $9.00 each NA NA $10.00 $148 Restroom Key (purchase or refundable deposit) $25.00 per key NA NA $26.00 $149 Storage Fee - Co-Sponsored Groups Only50 Small Locker $412.00 per year NA NA $429.00 $1751 Medium Locker $487.00 per year NA NA $507.00 $2052 Large Locker $655.00 per year NA NA $682.00 $2753 Room/Small Clubhouse $1,200.00 per year NA NA $1,248.00 $4854 Recreation Sports Venue Rentals and Fees55 Raquet Courts (min. 1 hour rental)56 Tennis Resident $10.50 per hour NA NA $11.00 $0.5057 Pickleball Resident $8.00 per hour NA NA $8.00 $058 Co-Sponsored $7.25 per hour NA NA $7.50 $0.2559 Instruction Use $19.00 per hour NA NA $20.00 $160 City Co-Sponsored Group Team Captain Permit Fee $32.00 per season NA NA $34.00 $261 Tennis Transfer/Cancellation Fee $1.00 per hour NA NA $1.00 $062 Private Instructor Processing Fee (Tennis Certification and Insurance Required) $34.00 per year NA NA $36.00 $2 63 Light Surcharge (Cerrito Vista) $4.25 per hour NA NA $4.50 $0.25 64 Play Fields65 Resident $34.00 per hour NA NA $36.00 $266 Cerrito Vista Hardball Field (2 hr. minimum)—Resident $46.00 per hour NA NA $48.00 $267 El Cerrito Co-Sponsored Youth Group $15.00 per hour NA NA $16.00 $168 Fine for violation of field policies and/or damaging fields when wet and or not playable or signs are posted. $394.00 per infraction NA NA $410.00 $16 69 Swim Center Programs/Fees * Effective September 170 Adult Swim Fees71 Lap Swim/Recreation/Family Swim72 30 Day Pass - Resident $96.00 valid 30 days NA NA $96.00 $073 15-Swim Pass—Resident $96.00 per pass NA NA $96.00 $074 Drop-In $8.00 per use NA NA $8.00 $075 Masters Swim Team 59 Agenda Packet Page 138 of 293

RECREATION
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 76 Drop-In $13.00 per use NA NA $13.00 $077 30 Day Pass - Resident $103.00 valid 30 days NA NA $107.00 $478 Masters Plus—Any Masters Workout/Lap Swim 30 Days Only 79 Monthly 30 Day Masters Plus Resident $146.00 valid 30 days NA NA $152.00 $680 Recreation Parent & Child Swim/Splash Park/Tot Splash 81 Drop-in82 Adult (18+) $8.00 per use NA NA $8.00 $083 Youth (1-17 years) $5.00 per use NA NA $5.00 $084 Splash Park & Tot Splash $5.00 per use NA NA $5.00 $085 Non-Swimmer Fee $5.00 per use NA NA $5.00 $086 Organized Groups (minimum of 15) $5.00 per child NA NA $5.00 $087 30 Days88 Youth—(1-17 years) Resident $63.00 valid 30 days NA NA $63.00 $0 89 15 Swim Pass90 Youth Resident (1-17) $60.00 per pass NA NA $63.00 $391 Splash Park/Tot Splash 15 Swim Pass92 Resident $50.00 per pass NA NA $63.00 $1393 Water Aerobics Deep/Shallow94 Drop In $13.00 per use NA NA $13.00 $095 10-Punch Pass - Resident $94.00 per pass NA NA $98.00 $496 Swim Lessons97 Private—Resident $38.00 per class NA NA $39.00 $198 Semi-Private - Resident $64.00 per class NA NA $66.00 $299 Youth Groups—Resident $16.00 per class NA NA $17.00 $1100 Special Arrangement Group Lesson—Resident $17.00 per class NA NA $18.00 $1101 Teen/Adult Group Lessons - Resident $30.00 per class NA NA $32.00 $2102 Swimming Clubs, Teams & Meets103 El Cerrito High School Team $3,375.00 per season NA NA $3,510.00 $135104 El Cerrito High School Team non-operating hours $36.00 per hour per staff NA NA $38.00 $2105 Gators Swim Club106 One Swimmer - Resident $5.50 per hour NA NA $6.00 $1107 Each Additional Household Member Discount 10% monthly discount percent NA NA $0.10 $0108 Swim Center Rentals109 Long-Term Pool Rentals $19.00 per lane/ per hour NA NA $20.00 $1110 Lane Rental Fee $24.00 per lane/ per hour NA NA $25.00 $1111 Emery G. Weed III Lap Pool-Resident, non-operating hours, practice time $173.00 per hour NA NA $180.00 $7
112 Emery G. Weed III Lap Pool—Resident, non-operating hours, event rental $288.00 per hour NA NA $300.00 $12 113 Swim Center Rental Deposit (refundable) $124.00 per event NA NA $129.00 $5 114 Recreation Pool-Resident (1-50 people) (2-hour minimum) $202.00 per hour NA NA $210.00 $8115 Recreation Pool-Resident (51-100 people) (2-hour minimum) $217.00 per hour NA NA $226.00 $9116 Splash Park Rental-Resident (1-50 people) ( 2-hour minimum) $178.00 per hour NA NA $185.00 $7 60 Agenda Packet Page 139 of 293

RECREATION
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 117 Splash Park Rental-Resident (51-100 people) ( 2-hour minimum) $190.00 per hour NA NA $198.00 $8118 Transfer Fee $60.00 per booking NA NA $63.00 $3119 Picnic Area Rental During Recreation Swim (Splash Park Area & Swim Camp Lawn Area) Resident (11-20 people) - listed fee plus lifeguard rate below $96.00 per event NA NA $99.00 $3
120 Picnic Area rental during Recreation Swim (Swim Camp Lawn Area) Resident (11-15 people) - listed fee plus lifeguard rate below $71.00 per event NA NA $74.00 $3 121 Lifeguard Fee $36.00 per hour $38.93 2% $38.00 $2122 Miscellaneous Swim Center Fees Annual Pass holders can use passes on holidays, not charged surcharge No Residency Surcharge for Drop-In Fees
123 Auto-Debit Pass Discount 10% per month NA NA 10% $0124 Single Lane Program/Holiday Reservation Surcharge - Resident $3.00 per swim NA NA $3.00 $0125 Single Lane Program/Holiday Reservation Surcharge - Non- Resident $5.00 per swim NA NA $5.00 $0 126 Annual Pass holders can use passes on holidays, not charged surcharge127 Youth Programs128 Day Camps *Effective September 1129 City Run Camp Resident (Price based on number of days up to 5 days, hours, special events, field trips, supplies needed) $20-$598 See brochure for actual costs NA NA $20-$622 Varies 130 Day Camp Deposit $47.00 per camp/week NA NA $49.00 $2131 Day Camp Cancellation Fee $47.00 per camp/week NA NA $49.00 $2 132 Overnight Camp *Effective September 1133 Camper - Resident (price depends on staffing and rental costs, duration of session and other fixed costs) $450-$1352 per session NA NA $450-$1,406 Varies 134 CIT/TILT Programs - Residents $220-$988 per session NA NA $220-$1,028 Varies 135 Deposit $156.00 per week NA NA $156.00 $0136 Before/After School Childcare137 5 day schedule, AM Care (~ 1.5 hours/day) $341.00 per month (10 Total) NA NA $355.00 $14138 4 day schedule, AM Care (~1.5vhours/day) $300.00 per month (10 Total) NA NA $312.00 $12139 3 day schedule, AM Care (~1.5 hours/day) $246.00 per month (10 Total) NA NA $256.00 $10140 2 day schedule, AM Care (~1.5 hours/day) $178.00 per month (10 Total) NA NA $185.00 $7141 1 day schedule, AM Care (~1.5 hours/day) $89.00 per month (10 Total) NA NA $93.00 $4142 5 day schedule, TK/Kinder Childcare (~ 4.25 hours/day) $820.00 per month (10 Total) NA NA $853.00 $33143 4 day schedule, TK/Kinder Childcare (~4.25 hours/day) $722.00 per month (10 Total) NA NA $750.00 $28144 3 day schedule, TK/Kinder Childcare (~4.25 hours/day) $590.00 per month (10 Total) NA NA $614.00 $24145 2 day schedule, TK/Kinder Childcare (~4.25 hours/day) $427.00 per month (10 Total) NA NA $444.00 $17146 1 day schedule, TK/ Kinder Childcare (~4.25 hours/day) $214.00 per month (10 Total) NA NA $222.00 $8147 5 day schedule, Kindergarten Childcare (~ 4 hours/day) $772.00 per month (10 Total) NA NA $803.00 $31148 4 day schedule, Kindergarten Childcare (~4 hours/day) $679.00 per month (10 Total) NA NA $706.00 $27149 3 day schedule, Kindergarten Childcare (~4 hours/day) $556.00 per month (10 Total) NA NA $578.00 $22150 2 day schedule, Kindergarten Childcare (~4 hours/day) $402.00 per month (10 Total) NA NA $418.00 $16151 1 day schedule, Kindergarten Childcare (~4 hours/day) $201.00 per month (10 Total) NA NA $209.00 $8152 5 day schedule, 1st - 6th PM Care (~3.33 hours/day) $673.00 per month (10 Total) NA NA $699.00 $26 61 Agenda Packet Page 140 of 293

RECREATION
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 153 4 day schedule, 1st - 6th Care (3.33 hours/day) $592.00 per month (10 Total) NA NA $616.00 $24154 3 day schedule, 1st - 6th PM Care (~3.33 hours/day) $484.00 per month (10 Total) NA NA $504.00 $20155 2 day schedule, 1st - 6th PM Care (~3.33 hours/day) $350.00 per month (10 Total) NA NA $364.00 $14156 1 day schedule, 1st - 6th PM Care (~3.33 hours/day) $175.00 per month (10 Total) NA NA $182.00 $7157 TK & Kinder Club (~1 hour/day) $16.00 per day NA NA $17.00 $1158 Preschool *Effective September 1159 4 day schedule, 3 hour program $611.00 per month NA NA $636.00 $25160 3 day schedule, 3 hour program $458.00 per month NA NA $477.00 $19161 2 day schedule, 3 hour program $306.00 per month NA NA $318.00 $12162 1 day schedule, 3 hour program $153.00 per month NA NA $159.00 $6163 3 day schedule, 4 hour program $611.00 per month NA NA $636.00 $25164 2 day schedule, 4 hour program $407.00 per month NA NA $424.00 $17165 1 day schedule, 4 hour program $204.00 per month NA NA $212.00 $8166 Other Fees167 Before/After School & Preschool Programs - Non-Refundable Registration Fee $86.00 per registration $104.40 14% $90.00 $4 168 Before/After School & Preschool Programs - Drop-In fee, under 3 hours program $26.00 per day/per program NA NA $28.00 $2 169 Before/After School & Preschool Programs - Drop-In fee, over 3 hours program $50.00 per day/per program NA NA $52.00 $2 170 Before/After School Program - Receives Reduced Lunch 30% discount NA NA 30% $0171 Before/After School Program - Receives Free Lunch 50% discount NA NA 50% $0172 Preschools - Non-Resident Rate 20% surcharge NA NA 20% $0173 Preschools - Qualifies for City Scholarship - Residents 25% discount NA NA 25% $0174 Preschools - Qualifies for City Scholarship - Non Resident Regular Resident Rate discount NA NA Regular Resident Rate $0 175 Fees can be adjusted proportionally due to substantial changes in program hours at the discretion of the Recreation Director program hours 176 Fees can be adjusted proportionate to any mandated staff to child ratio changes at the discretion of the Recreation Director staffing/ enhanced requirements 177 Preschools - Over 8 hours (full day) 10% monthly discount NA NA 10% $0 178 Before/After School & Preschool Fees Include 3.5% Admin Surcharge listed in "Other Fees & Discounts" Section179 Adult Programs and Services180 Respite Group—Resident $32.00 per day NA NA $34.00 $2181 Easy Ride Paratransit, each way $2.00 per trip NA NA $2.00 $0182 City Run Day Trips Resident (Prices based on mileage, length of trip, admission rates, volunteer trip leader expenses and supplies needed, staff planning time) $15-$260 see brochure for actual costs NA NA $15-$270 Varies 183 Other Fees & Discounts184 Miscellaneous185 Transfers, Cancellations (non-camp), and Late Payments (25% of fee, up to maximum and rounded to nearest dollar) $25.00 maximum charge per session NA NA $26.00 $1 186 Late Pick-Up Fee ($20 minimum + $1.00 per minute) $20.00 minimum late pick-up fee NA NA $20.00 $0187 Misc. Product Fee (depending on level of effort) Cost + 5%-20% each + surcharge NA NA Cost + 5%-20% $0188 Staff Total Cost (i.e. custodian, part time recreation leader, etc.) Full Hourly Cost per hour NA NA Full Hourly Cost $0 62 Agenda Packet Page 141 of 293

RECREATION
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Suggested Fee Fee Δ 189 Signage/Banner on Recreational Facilities (per policy) $0-$78 per banner or sign/month NA NA $0-$78 $0190 Long Term Rental Discount - as determined by Recreation Director191 Administrative Surcharge Fee for City Run Programs 3.5% per transaction NA NA 3.5% $0192 Non-Resident & Commercial Facility Rentals Fee Surcharge - rounded to nearest dollar (unless otherwise noted) 25% additional amount NA NA 25% $0 193 Special Promotion/Marketing Fundraising Opportunities - as determined by Recreation Director194 New Classes, Events, Field Trips, Leagues, Programs, Products, Uniforms, etc. as approved by Recreation Director195 City Run Program (Price based on number of days and hours, cost of supplies, staff, and staff planning time) $0-$229 per day/per program NA NA $0-$229 $0 196 Third Party Programs197
The fees for all third party provided activities may vary based on contract negotiations & market rates at discretion of theRecreation Director 198 No Non-Resident Surcharges for El Cerrito School Based Enrichment Programs199 Surcharge on Fee-Based Programs by Independent Contractor 3.5% percent of fee NA NA 3.5% $0200 Optional Disabled and Senior Discount (independent contractors may choose to use discount and split discount with City) - for ages 60+, disabled patrons. Does not apply to fees in "Adult Programs and Services" section. 15% percent of fee NA NA 15% $0
201 Recreation Brochure Advertisements202 Copy Ready, 1/8 page $208.00 each NA NA $217.00 $9203 Copy Ready, Quarter page $468.00 each NA NA $487.00 $19204 Copy Ready, Half page $780.00 each NA NA $812.00 $32205 Copy Ready, Full page $1,300.00 each NA NA $1,352.00 $52206 Full Year of Advertising (3 RECguide Issues) 15% Discount NA NA 15% $0 207 Graphic Preparation-Graphic Designer Actual Cost Actual NA NA Actual Cost $0 63 Agenda Packet Page 142 of 293
27368 Via Industria, Suite 200
Temecula, California 92590-4856
800.755.6864 | Fax: 888.326.6864
951.587.3500 | Fax: 951.587.3510
www.willdan.com
Agenda Packet Page 143 of 293
Agenda Item No. 8.B.

Attachment 2
RESOLUTION 2025-XX

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL CERRITO ADOPTING REVISIONS TO THE MASTER FEE SCHEDULE FOR FISCAL YEAR 2025-26 WHEREAS, El Cerrito Municipal Code Section 4.01.010 requires that prior to July 1st of each year, the City Council shall consider and adopt the schedule of all general and special fees and charges to be known as the Master Fee Schedule; and WHEREAS, the City Council desires to update currently established fees to cover City costs, including inflation, which form the basis for the majority of the changes in keeping with City Council policy direction. After proposed adjustments, the fee amounts will not exceed the City’s costs of providing the services for which the fees are charged; and
WHEREAS, utilizing a rounding factor provides ease to our customers and our staff in the payment of these fees; and
WHEREAS, the City’s Municipal Code requires that Business License Taxes be revised based on the percent change from the February 1988 figure of 117.0 in the Revised Consumer Price Index for Urban Wage Earners and Clerical Workers for the San Francisco-Oakland Bay Area as published by the Department of Labor for the month of February prior to the fiscal year in which the rate adjustment is applicable; and WHEREAS, adjustments to market-driven fees and service charges consider factors to keep those fees and charges comparable to those charged by entities providing similar services; and
WHEREAS, a public hearing has been noticed and held in accordance with Government Code Sections 6062a, 66016, 66017 and 66018.

NOW THEREFORE, BE IT RESOLVED by the City Council of the City of El Cerrito that it hereby adopts the fees and services charges in the Proposed Master Fee Schedule for the City of El Cerrito (as shown in Exhibit A), which is hereby attached and by this reference made a part hereof, for FY 2025-26.

BE IT FURTHER RESOLVED that the City Council of the City of El Cerrito hereby confirms the adjustments to the Business License Tax rates, also as appearing in the Master Fee Schedule.

BE IT FURTHER RESOLVED that the fees, charges, and taxes in the Proposed Master Fee Schedule will become effective on July 1, 2025, except for Development Fees, which will become effective 60 days after approval of this resolution, and Swim Center, Day and Overnight Camps, and Preschool Fees, which will become effective on August 25, 2025.

Agenda Packet Page 144 of 293
I CERTIFY that at a regular meeting on May 20, 2025 the City Council of the City of El Cerrito passed this Resolution by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSTAIN: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

IN WITNESS of this action, I sign this document and affix the corporate seal of the City of El Cerrito on .
________________________
Holly M. Charléty, City Clerk
APPROVED:
________________________
Carolyn Wysinger, Mayor
Agenda Packet Page 145 of 293
City of El Cerrito
Master Fee Schedule
Fiscal Year 2025-26
Agenda Item No. 8.B.

Attachment 3:

Exhibit A to Resolution
Agenda Packet Page 146 of 293
City of El Cerrito - User Fee Study
Fully Burdened Hourly Rate Calculation
Department Title
S&B Hourly
Rate Direct % Indirect %
Fully Burdened
Hourly Rate
101: Community Development CD - ADMIN CLERK SPECIALIST $61.04 23% 28% $95.60 101: Community Development CD - Associate Planner $95.01 23% 28% $148.81 101: Community Development CD - Building Inspector II $97.90 23% 28% $153.33 101: Community Development CD - Building Official $156.82 23% 28% $245.61 101: Community Development CD - Building Permit Tech I $83.71 23% 28% $131.10 101: Community Development CD - Building Permit Tech III $97.89 23% 28% $153.31 101: Community Development CD - Community Development Director $197.60 23% 28% $309.47 101: Community Development CD - Management Assistant $91.80 23% 28% $143.78 101: Community Development CD - Neighborhood Presv. Officer $97.61 23% 28% $152.86 101: Community Development CD - Plan Checker II $109.99 23% 28% $172.25 101: Community Development CD - Planning Manager $164.82 23% 28% $258.13 101: Community Development CD - Senior Planner $126.00 23% 28% $197.34 101: Community Development CD - Senior Program Manager $118.71 23% 28% $185.92 101: City Clerk Clerk - City Clerk $186.47 6% 0% $196.74 101: City Clerk Clerk - Management Assistant $72.38 6% 0% $76.37 101: City Manager CM - Assistant City Manager $220.50 7% 0% $235.59 101: City Manager CM - Assistant to the City Manager $142.39 7% 0% $152.14 101: City Manager CM - City Manager $229.09 7% 0% $244.77 101: City Manager CM - Management Assistant $87.67 7% 0% $93.67 101: Finance Finance - Accountant I $85.45 14% 0% $97.31 101: Finance Finance - Budget/Financial Services Mngr $153.43 14% 0% $174.74 101: Finance Finance - Finance Director/City Treasurer $166.99 14% 0% $190.18 101: Finance Finance - Management Assistant $87.67 14% 0% $99.84 101: Finance Finance - Senior Accountant $98.17 14% 0% $111.81 101: Finance Finance - Senior Finance Technician $94.38 14% 0% $107.49 101: Fire Fire - Battalion Chief $241.78 8% 16% $304.91 101: Fire Fire - Battalion Chief/Paramedic $255.87 8% 16% $322.68 101: Fire Fire - Fire Captain $187.00 8% 16% $235.83
101: Fire Fire - Fire Captain/Paramedic $202.48 8% 16% $255.35 101: Fire Fire - Fire Captain/Paramedic Assign $202.40 8% 16% $255.25 101: Fire Fire - Fire Captain/Paramedic/FPO $219.49 8% 16% $276.80 101: Fire Fire - Fire Chief $273.20 8% 16% $344.53
101: Fire Fire - Fire Engineer $154.61 8% 16% $194.98
101: Fire Fire - Fire Engineer/Paramedic Assign $172.96 8% 16% $218.12 101: Fire Fire - Firefighter $127.74 8% 16% $161.10
101: Fire Fire - Firefighter/Paramedic Assign $147.63 8% 16% $186.18 101: Fire Fire - Firefighter/Paramedic Assignment $138.76 8% 16% $175.00 101: Fire Fire - Public Safety Executive Asst $91.69 8% 16% $115.63 101: Fire Fire - Senior Program Manager $105.83 8% 16% $133.46 202: Nat'l Pollut Dis Elim Sys Fund 202 - Associate Engineer $125.30 23% 21% $185.92 202: Nat'l Pollut Dis Elim Sys Fund 202 - Engineering Technician $81.51 23% 21% $120.93 202: Nat'l Pollut Dis Elim Sys Fund 202 - Maintenance Ops Supervisor $107.65 23% 21% $159.73 202: Nat'l Pollut Dis Elim Sys Fund 202 - Maintenance Svcs Leadworker $94.64 23% 21% $140.42 202: Nat'l Pollut Dis Elim Sys Fund 202 - Maintenance Worker $78.60 23% 21% $116.62 202: Nat'l Pollut Dis Elim Sys Fund 202 - Management Assistant $71.65 23% 21% $106.31 202: Nat'l Pollut Dis Elim Sys Fund 202 - Ops and Environmental Svcs Mgr $143.04 23% 21% $212.23 202: Nat'l Pollut Dis Elim Sys Fund 202 - Program Manager $120.98 23% 21% $179.50 202: Nat'l Pollut Dis Elim Sys Fund 202 - Public Works Director/City Eng $218.13 23% 21% $323.64 203: Land & Light Assess Distr Fund 203 - Custodian $54.70 21% 22% $80.40 203: Land & Light Assess Distr Fund 203 - Maintenance Ops Supervisor $107.65 21% 22% $158.21 203: Land & Light Assess Distr Fund 203 - Maintenance Svcs Leadworker $94.64 21% 22% $139.09 203: Land & Light Assess Distr Fund 203 - Maintenance Worker $78.60 21% 22% $115.51 203: Land & Light Assess Distr Fund 203 - Program Manager $120.98 21% 22% $177.79 101: Information Systems IS - Information Tech Specialist $104.13 11% 0% $115.26 101: Information Systems IS - Information Technology Manager $178.35 11% 0% $197.41 101: Information Systems IS - Network Security Engineer $103.53 11% 0% $114.59 501: Integrated Waste Mgmt IWM - Administrative Clerk $62.91 27% 24% $99.15 501: Integrated Waste Mgmt IWM - Assistant City Manager $220.50 27% 24% $347.53 501: Integrated Waste Mgmt IWM - Assistant to the City Manager $142.39 27% 24% $224.42 Agenda Packet Page 147 of 293
City of El Cerrito - User Fee Study
Fully Burdened Hourly Rate Calculation
Department Title
S&B Hourly
Rate Direct % Indirect %
Fully Burdened
Hourly Rate
501: Integrated Waste Mgmt IWM - City Manager $229.09 27% 24% $361.06 501: Integrated Waste Mgmt IWM - Forklift Operator $73.68 27% 24% $116.13 501: Integrated Waste Mgmt IWM - Maintenance Ops Supervisor $107.65 27% 24% $169.67 501: Integrated Waste Mgmt IWM - Maintenance Svcs Leadworker $94.64 27% 24% $149.16 501: Integrated Waste Mgmt IWM - Maintenance Worker $78.60 27% 24% $123.88 501: Integrated Waste Mgmt IWM - Management Analyst III $109.30 27% 24% $172.27 501: Integrated Waste Mgmt IWM - Management Assistant $71.65 27% 24% $112.93 501: Integrated Waste Mgmt IWM - Ops and Environmental Svcs Mgr $143.04 27% 24% $225.44 501: Integrated Waste Mgmt IWM - Public Works Director/City Eng $218.13 27% 24% $343.79 501: Integrated Waste Mgmt IWM - Recycling Leadwkr -filled as Wkr $95.74 27% 24% $150.89 501: Integrated Waste Mgmt IWM - Recycling Maintenance Worker $87.46 27% 24% $137.84 501: Integrated Waste Mgmt IWM - Recycling Operations Supv $118.53 27% 24% $186.82 501: Integrated Waste Mgmt IWM - Waste Prevention Specialist $84.45 27% 24% $133.10 101: Police Police - Community Service Officer $92.09 6% 20% $117.11 101: Police Police - Police Captain $220.16 6% 20% $279.95 101: Police Police - Police Chief $293.86 6% 20% $373.67 101: Police Police - Police Corporal $149.37 6% 20% $189.94 101: Police Police - Police Lieutenant $242.58 6% 20% $308.46 101: Police Police - Police Officer $127.86 6% 20% $162.59 101: Police Police - Police Officer - Det Assign $136.40 6% 20% $173.45 101: Police Police - Police Officer - K9 $143.25 6% 20% $182.16 101: Police Police - Police Officer - Traffic $145.67 6% 20% $185.24 101: Police Police - Police Records Specialist $73.81 6% 20% $93.86 101: Police Police - Police Records Supervisor $112.33 6% 20% $142.84 101: Police Police - Police Sergeant $189.84 6% 20% $241.40 101: Police Police - Police Sergeant - Admin $208.19 6% 20% $264.74 101: Police Police - Property and Evidence Specialist $89.13 6% 20% $113.34 101: Police Police - Public Safety Executive Asst $80.67 6% 20% $102.58 101: Police Police - Senior Police Records Specialist $76.31 6% 20% $97.03 101: Public Works PW - Associate Engineer $118.36 11% 49% $194.81 101: Public Works PW - Engineering Technician $81.51 11% 49% $134.16 101: Public Works PW - Management Assistant $70.75 11% 49% $116.45 101: Public Works PW - Public Works Director/City Eng $218.13 11% 49% $359.04 101: Public Works Maintenance PW Maint - Maintenance Ops Supervisor $107.65 41% 0% $152.25 101: Public Works Maintenance PW Maint - Maintenance Svcs Leadworker $94.64 41% 0% $133.85 101: Public Works Maintenance PW Maint - Maintenance Worker $73.29 41% 0% $103.66 101: Public Works Maintenance PW Maint - Management Analyst III $109.30 41% 0% $154.59 101: Public Works Maintenance PW Maint - Public Works Director/City Eng $218.13 41% 0% $308.50 101: Recreation Rec - Admin Clerk Specialist $73.67 21% 30% $115.68 101: Recreation Rec - Assistant Program Supervisor $75.22 21% 30% $118.11 101: Recreation Rec - Childcare Teacher $64.72 21% 30% $101.63 101: Recreation Rec - Community Services Coordinator $76.08 21% 30% $119.46 101: Recreation Rec - Recreation Director $187.66 21% 30% $294.67 101: Recreation Rec - Recreation Supervisor $118.52 21% 30% $186.11 101: Recreation Custodial Rec Custodial - Custodial Maintenance Leadworker $98.32 24% 0% $121.65 101: Recreation Custodial Rec Custodial - Custodian $64.15 24% 0% $79.37 101: Recreation Custodial Rec Custodial - Recreation Supervisor $128.15 24% 0% $158.56 Part Time/Contract Positions
101: Recreation Childcare Aide 22.53 21% 30% 35.38
101: Recreation Childcare Teacher 25.47 21% 30% 40.00
101: Recreation Community Services Coordinator Temp 37.43 21% 30% 58.78 101: Public Works Maintenance Maintenance Worker I 28.53 41% 0% 40.36 101: Recreation Custodial PT Custodian 28.66 24% 0% 35.47 501: Integrated Waste Mgmt Recycling Operations Worker 29.92 27% 24% 47.16 101: Recreation Van Driver II 26.73 21% 30% 41.97
101: Police Police Recruit 33.07 6% 20% 42.05
101: Recreation Lifeguard I 24.79 21% 30% 38.93
Agenda Packet Page 148 of 293
City of El Cerrito - User Fee Study
Fully Burdened Hourly Rate Calculation
Department Title
S&B Hourly
Rate Direct % Indirect %
Fully Burdened
Hourly Rate
101: Recreation Lifeguard II 26.03 21% 30% 40.87
101: Recreation Recreation Leader I 22.49 21% 30% 35.32 101: Recreation Recreation Leader II 23.61 21% 30% 37.07 101: Recreation Recreation Leader III 25.97 21% 30% 40.78 101: Recreation Recreation Leader IV 63.49 21% 30% 99.70 101: Recreation Van Driver I 24.22 21% 30% 38.03
101: Recreation Aquatics Assistant I 20.88 21% 30% 32.79 101: Recreation Aquatics Assistant II 21.41 21% 30% 33.62 101: Recreation Aquatics Instructor I 26.73 21% 30% 41.97 101: Recreation Aquatics Instructor II 28.07 21% 30% 44.08 101: Recreation Aquatics Instructor III 40.67 21% 30% 63.86 101: Recreation Facility Attendant 23.61 21% 30% 37.07
101: Recreation Pool Manager 29.48 21% 30% 46.29
101: Recreation Senior Lifeguard 24.79 21% 30% 38.93
City Attorney 442.00 442.00
Agenda Packet Page 149 of 293
Citywide Services
Item
No. Title Current Fee/Charge Unit Full Cost Subsidy % Proposed Fee Fee Δ 1 Printing, Reproduction, Documents
2 Photocopies
3 Photocopies (11x17 or smaller) $0.10 per page $0.10 0% $0.10 $0 4 Retrieval fee for Campaign Statements older than 5 years $5.00 per request NA NA $5.00 $0 5 Photocopies (11x17 or larger) $0.25 per page $2.05 0% $2.05 $2 6 Maps
7 City Maps (First sheet includes search and restock cost per original searched.) $3.37 each NA NA $3.37 $0
8 Special Studies Maps, 11" x 17" $5.62 each NA NA $5.62 $0 9 Special Studies Maps, 36" x 54" $43.87 each NA NA $43.87 $0 10 Subpoena Duces Tecum
11 per CA Evidence Code §1563 Based on Code NA NA Based on Code $0 12 Miscellaneous Services and Charges
13 Notary, Certification, Legal and Special Services
14 Notary Services (Set by Calif. Secretary of State) $15.00 per signature NA NA $15.00 $0 15 City Clerk Document Certification $6.75 each $22.95 35% $15.00 $8 16 Legal Fees—Recovery of legal costs in lawsuits and other instances when the City could be entitled to reimbursement of legal costs. actual cost labor and overhead NA NA actual cost $0
17 Finance Charges
18 Finance Charge on fees remaining unpaid for a period exceeding 30 days (unless the ordinance establishing the fee provides for a penalty in a different amount)

1.5% per month unpaid balance NA NA 1.5% per month $0
19 Returned Check Fee $26.00 per check NA NA First Check $25/$35 Additional Check -$1
20 Duplicate Business License Certificate $7.87 per copy $15.27 0% $15.27 $7 Agenda Packet Page 150 of 293
Citywide Services
Item
No. Title Current Fee/Charge Unit Full Cost Subsidy % Proposed Fee Fee Δ 21 Credit Card Transaction Fee actual cost per transaction NA NA actual cost $0 Agenda Packet Page 151 of 293
Citywide Services
Item
No. Title Current Fee/Charge Unit Full Cost Subsidy % Proposed Fee Fee Δ 22 Parking Permits
23 1 to 3-year cycles $40.50 per year $68.35 1% $68.00 $28 24 14-day Temporary Parking Permit $40.50 each $68.35 1% $68.00 $28 25 Replacement Parking Permit $40.50 each $68.35 1% $68.00 $28 26 Use of Council Chambers (Government Agencies Only) $47.32 per meeting $58.78 15% $50.00 $3 27 Use of Council Chambers with Technology/AV Support $47.32 per meeting $192.46 14% $165.00 $118 28 Tobacco Retailer License Program Fees
29 Tobacco retailer license (initial license and renewal) $523.49 Per location $590.99 0% $590.00 $67 30 Re-inspection fee (for non-compliant businesses) actual cost Hourly NA NA actual cost $0 31 Rent Registry
32 Rent Registry $44.99 per unit $49.73 1% $49.00 $4
33 Election Related Filing Fees
34 Citizen Initiative Petition Filing Fee (refunded if petition qualifies within one year of filing) $200.00 per filing NA NA $200.00 $0 35 Code Enforcement
36 Administration Citation Fee $20.55 $183.41 0% $183.00 $162 37 Title Report New each NA NA Actual Cost +10% NA
38 Inspection Warrant New each $1,146.48 0% $1,146.00 NA 39 Abatement Warrant New each $1,299.34 0% $1,299.00 NA 40 Lien and Special Assessment New each $611.46 0% $611.00 NA 41 Release of Recordation New each $305.73 0% $305.00 NA 42 Recording of Pendency Action New each $305.73 0% $305.00 NA 43 Re-inspections (non-compliant parcel) New each $152.86 1% $152.00 NA Agenda Packet Page 152 of 293

BUSINESS LICENSE
Item
No. Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 1 Business Enrollment $90.15 per license $98.02 0% $98.00 $8 2 Business License Renewal $30.05 per license $35.35 1% $35.00 $5 3 Accessibility Compliance and Education Fee $4.12 per license (State Mandated AB 1379) NA NA $4.00 $0 4 Admin Delinquent Business License Collection
Fee
New Per license Staff time, software, Plus
Citation Fee $47.35 1% $47.00 NA
5 Business Name Change New Per license $28.76 3% $28.00 NA Agenda Packet Page 153 of 293

BUSINESS LICENSE
FY 2025
CPI-U Rate (Per ECMC

4.32.381)
FY 2026
CPI-U Rate (Per ECMC 4.32.381)
Item Description Municipal Code
Section Code Adopted Proposed
FY 2024-25 variance due to
rounding
FY 2025-26 Variance due to
rounding

2.90% 2.70%
Business License Residential Rentals (10-000-4052-00-00) Apt. Houses, Duplexes, In-laws &
Single Family Units
Per Unit 4.32.260 260 133 136
Business License All Others (10-000-4051-00-00)
a. Fixed Place of Business
(Annual)
Employer Only 4.32.230 T23 370 380
" + 1 employee 4.32.230 T23 370 380
" + 2 employees 4.32.230 T23 424 435
" + 3 employees 4.32.230 T23 478 491
" + 4 employees 4.32.230 T23 532 546
" + 5 employees 4.32.230 T23 586 602
" + 6 employees 4.32.230 T23 639 656
" + 7 employees 4.32.230 T23 694 712
" + 8 employees 4.32.230 T23 747 767
" + 9 employees 4.32.230 T23 800 821
" + 10 employees 4.32.230 T23 855 878
Each Additional Employee 4.32.231 T23 53 55
b. Professional Offices (Annual)
Employer Only Employer Only 4.32.231 231 450 462
" + 1 employee " + 1 employee 4.32.231 231 450 462
" + 2 employees " + 2 employees 4.32.231 231 504 518
" + 3 employees " + 3 employees 4.32.231 231 557 572
" + 4 employees " + 4 employees 4.32.231 231 611 628
" + 5 employees " + 5 employees 4.32.231 231 665 683
" + 6 employees " + 6 employees 4.32.231 231 719 739
" + 7 employees " + 7 employees 4.32.231 231 774 795
" + 8 employees " + 8 employees 4.32.231 231 826 849
" + 9 employees " + 9 employees 4.32.231 231 881 905
" + 10 employees " + 10 employees 4.32.231 231 934 959
Each Additional Employee Each Additional Employee 4.32.231 231 53 55 -
c. Contractors & Subcontractors -
Quarterly 4.32.240 242 159 164
Semiannually 4.32.240 241 267 274
Annually 4.32.240 240 478 491
-
d. Home Occupations (Annual) 4.32.245 245 267 274
-
e. Casual Business -
Quarterly 4.32.246 247 77 79
Annually 4.32.246 246 314 322
f. Delivery Vehicles (Per Vehicle) 4.32.251 250 212 218 g. Fine Arts Teachers (Per
Teacher) 4.32.255 255 86 88
h. Hotels & Motels
Base Fee 4.32.270 270 530 544
Plus, per Unit Fee 4.32.270 270 23 23
Agenda Packet Page 154 of 293
i. Trailer Courts
Base Fee 4.32.280 280 530 544
Plus, per Unit Fee 4.32.280 280 23 23
j. Restaurants & Nightclubs 4.32.290 290 1,060 1,089
k. Public Amusement

1. Amusement Rides & Shows
First Day 4.32.300 300 212 218
Each Additional Day 4.32.300 300 107 110

2. Billiards, Bagatelle, Pool
Tables
Per Table, in Addition to Other
Applicable 4.32.300 301 107 110

3. Bowling Lanes
First Lane 4.32.300 302 562 577
Each Additional Lane 4.32.300 302 56 57
4a. Circus (=<4,000 seats)
First Day 4.32.300 303 1,592 1,635
Each Additional Day 4.32.300 303 1,060 1,089
4b. Carnival & Circus (>4,000
seats)
First Day 4.32.300 304 3,181 3,267
Each Additional Day 4.32.300 304 2,121 2,178

5. Motion Picture Theater &
Plays
Quarterly 4.32.300 307 212 218
Semiannually 4.32.300 306 426 437
Annually 4.32.300 305 849 872

6. Public Dance
Daily 4.32.300 308 159 164
Quarterly 4.32.300 309 530 544

7. Amusement Not Otherwise
Defined
Educational - Daily 4.32.300 310 159 164
Educational - Quarterly 4.32.300 311 530 544
Noneducational - Daily 4.32.300 312 5,300 5,443
l. Distribution and Circulation of
Advertising Matter
Quarterly 4.32.310 313 530 544
-
m. Amplification Vehicles (Per
Day) 4.32.320 320 5,300 5,443
n. Taxicabs (Per Vehicle) 4.32.330 330 319 327
o. Auctioneer
Daily 4.32.340 340 267 274
Annually 4.32.340 341 2,121 2,178
p. Vehicle Parking Lot
Per Lot 4.32.345 342 427 438
Plus per 100 square feet 4.32.345 342 43 44
q. Pawnbroker and Check
Casher 4.32.350 350 1,060 1,089
r. Patrol Services
Employer Only 4.32.355 T35 370 380
" + 1 employee 4.32.355 T35 370 380
Agenda Packet Page 155 of 293
" + 2 employees 4.32.355 T35 424 435
" + 3 employees 4.32.355 T35 478 491
" + 4 employees 4.32.355 T35 532 546
Each Additional Employee 4.32.355 T35 53 55
s. Peddler & Solicitors
Quarterly 4.32.360 360 530 544
Annually 4.32.360 361 2,121 2,178
t. Ice Cream Vendor
Quarterly 4.32.365 366 172 176
Annually 4.32.365 365 518 532
u. Temporary Sales 4.32.375 375 447 459
v. Bingo 4.32.300 652 70 72
Pursuant to California Penal
Code Section 326.5(l)1
w. Transient/Itinerant Vendor
Employer Only 4.32.010 T25 370 380
" + 1 employee 4.32.010 T25 370 380
" + 2 employees 4.32.010 T25 424 435
" + 3 employees 4.32.010 T25 478 491
" + 4 employees 4.32.010 T25 530 544
" + 5 employees 4.32.010 T25 586 602
" + 6 employees 4.32.010 T25 639 656
" + 7 employees 4.32.010 T25 694 712
" + 8 employees 4.32.010 T25 747 767
" + 9 employees 4.32.010 T25 800 821
" + 10 employees 4.32.010 T25 855 878
Each Additional Employee 4.32.010 T25 53 55
Business License Gross Receipts (10-000-4053-000)
a. Coin-operated vending,
amusement & Service Machines,
Distributors
$0-1,000 4.32.370 V01 56 57
$1,001-5,000 4.32.370 V02 83 85
$5,001-15,000 4.32.370 V03 167 171
>$15,001 per $1,000 4.32.370 T04 11 11
b. Coin-operated vending,
amusement & Service Machines,
Games of Skill
$0-1,000 4.32.380 G01 56 57
$1,001-5,000 4.32.380 G02 83 85
$5,001-15,000 4.32.380 G03 167 171
>$15,001 per $1,000 4.32.380 T05 11 11
Adjustment Per Municipal Code:

Feb % Change in CPI-W
CPI-W Wage Earners and
Clerical Workers
2025 Change = 2.7%
Agenda Packet Page 156 of 293

PLANNING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 1 San Pablo Avenue Specific Plan Design Review
2 Tier 1 Residential and Non-Residential Projects (includes signs) $2,557.00 Cat Ex and mailing cost included $3,027.86 0% $3,027.00 $470 3 Tier 1 Permanent Signs $668.00 Cat Ex and mailing cost included $772.09 0% $772.00 $104 4 Tier 1 Sidewalk Sign Permit (only) $186.00 Cat Ex and mailing cost included $219.61 0% $219.00 $33 5 Tier 1 Temporary Signs and/or Banners $62.00 Cat Ex and mailing cost included $122.20 0% $122.00 $60 6 Tier 1/AUP Sidewalk Seating (off ROW) $682.00 Cat Ex and mailing cost included $728.49 0% $728.00 $46 7 Outdoor Dining and Retail Permit $682.00 Cat Ex and mailing cost included $446.47 0% $446.00 -$236 8 Tier 1 - Minor $947.00 Cat Ex and mailing cost included $1,273.82 0% $1,273.00 $326 9 Tier 2 Residential and Non Res Projects - Up to 2,500 sqft $3,765.00 Mailing costs included $5,392.19 0% $5,392.00 $1,627 10 Tier 3 Residential and Non Res Projects - Up to 2,500 sqft $4,749.00 Mailing costs included $5,046.04 0% $5,046.00 $297 11 Tier 2 Residential and Non Res Projects - 2,501 - 10,000 sqft $9,933.00 Mailing costs included $12,013.93 0% $12,013.00 $2,080 12 Tier 3 Residential and Non Res Projects - 2,501 - 10,000 sqft $9,633.00 Mailing costs included $11,667.34 0% $11,667.00 $2,034 13 Tier 2 Residential and Non Res Projects - 10,001 – 40,000 sqft $16,279.00 Mailing costs included $17,972.31 0% $17,972.00 $1,693 14 Tier 3 Residential and Non Res Projects - 10,001 – 40,000 sqft $13,685.00 Mailing costs included $16,742.93 0% $16,742.00 $3,057 15 Tier 2 Residential and Non Res Projects - 40,001 – 100,000 sqft $21,089.00 Mailing costs included $25,542.90 0% $25,542.00 $4,453 16 Tier 3 Residential and Non Res Projects - 40,001 – 100,000 sqft $19,827.00 Mailing costs included $24,298.06 0% $24,298.00 $4,471 17 Tier 2 Residential and Non Res Projects - 100,001+ sqft base fee $21,106.00
after base fee hours are
depleated, project goes to
hourly rate
Mailing costs included $25,542.90 0% $25,542.00 $4,436
18 Tier 3 Residential and Non Res Projects - 100,001+ sqft base fee $20,752.00
after base fee hours are
depleated, project goes to
hourly rate
Mailing costs included $24,710.93 0% $24,710.00 $3,958
19 Tier 4 Residential and Non Res Projects - Up to 10,000 sqft $11,615.00 Mailing costs included $14,029.08 0% $14,029.00 $2,414 20 Tier 4 Residential and Non Res Projects - 10,001 – 40,000 sqft $15,218.00 Mailing costs included $17,660.18 0% $17,660.00 $2,442 21 Tier 4 Residential and Non Res Projects - 40,001 – 100,000 sqft $22,305.00 Mailing costs included $26,874.41 0% $26,874.00 $4,569 22 Tier 4 Residential and Non Res Projects - 100,001 + sqft base fee plus $24,288.00 Mailing costs included $29,834.51 0% $29,834.00 $5,546 23 Environmental Review - Specific Plan Environmental Check List and Initial Study 30%
Consultant costs, plus City
administrative fee (30% of consultant
cost)
NA NA 30% $0
24 Environmental Review - Categorical Exemption $200.00 If not already included in fee $446.42 0% $446.00 $246 25 Environmental Review - Administrative Fee for consultant prepared environmental documents and special studies 30% Of Consultant cost NA NA 30% $0 26 Pre-Application Review Meeting with Staff $0.00 staff review and comments provided to applicant $4,382.14 100% $0.00 $0
Agenda Packet Page 157 of 293

PLANNING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 27 Pre-Application Study Session with Planning Commission or Design Review Board $4,580.00 staff review and up to two public meetings $5,180.56 0% $5,180.00 $600 28 Pre-Application Review by Staff $1,683.00 Multi-department review and written comments $1,921.19 0% $1,921.00 $238
29 General Plan and Zoning Ordinance
30 General/Specific Plan and/or Amendment $22,131.00 each $27,817.86 0% $27,817.00 $5,686 31 Zoning Amendment $22,131.00 each $27,817.86 0% $27,817.00 $5,686 32 Subdivisions and Lot Adjustments
33 Tentative Parcel Map 1-4 lots $8,255.00 each $10,979.57 0% $10,979.00 $2,724 34 Tentative Tract Map 5-10 lots $13,864.00 each $16,592.68 0% $16,592.00 $2,728 35 Tentative Tract Map 11-25 lots $16,636.00 each $20,606.76 0% $20,606.00 $3,970 36 Tentative Tract Map 26+ lots (base fee for 25 lot map + fee for additional lots over 25) $2,539.00 per lot $942.21 0% $942.00 -$1,597 37 Final Map 1-4 lots $8,547.00 each $7,665.78 0% $7,665.00 -$882 38 Final Map 5+ lots $9,718.00 each $10,409.24 0% $10,409.00 $691 39 Exception to Subdivision Ordinance $11,442.00 each $6,023.93 0% $6,023.00 -$5,419 40 Lot Line Adjustment or Lot Merger $8,547.00 each $7,552.34 0% $7,552.00 -$995 41 Certificate of Compliance $7,134.00 each $7,063.70 0% $7,063.00 -$71 42 Planned Development
43 Planned Development $45,357.00 each $49,914.39 0% $49,914.00 $4,557 44 Development Agreement $49,826.00 each $56,001.83 0% $56,001.00 $6,175 45 Development Fees
46 Incentives Program Permit (Staff and Design Review Board review prior to application for Planning Commission
action, does not include Use Permit Fee)
$13,190.00 each $15,892.10 0% $15,892.00 $2,702
47 Accessory Dwelling Unit Permit $367.00 each $950.42 0% $950.00 $583 48 SB 9 Compliance Review for Proposed New Units $1,727.00 each $2,209.14 0% $2,209.00 $482 49 Home Occupation Permit $100.00 each $122.20 0% $122.00 $22 50 Zoning Clearance (Commercial) $645.00 each $724.29 0% $724.00 $79 51 Individual Business Sign Permit (as part of Master Sign Program) $100.00 each $98.67 1% $98.00 -$2
52 Preliminary Review of Multi-Story Single Family
Construction (RAD) $1,727.00 each $1,561.45 0% $1,561.00 -$166 53 Unspecified or Research - hourly $256.00 per hour $237.61 0% $237.00 -$19 54 Rebuild or Interpretation Letter $1,014.00 each $1,018.70 0% $1,018.00 $4 55 Fence Clearance $100.00 each $135.87 1% $135.00 $35
56 Residential Chicken Clearance $100.00 each $98.67 1% $98.00 -$2 57 Honeybee Keeping Clearance $100.00 each $195.81 0% $195.00 $95 58 Goat Weed Abatement Permit $100.00 each $98.67 1% $98.00 -$2 59 Unanimous Neighbor Consent Exception for Chickens and Bees $49.00 each $146.47 0% $146.00 $97
60 Zoning Information Form/Questionnaire $49.00 each $73.24 0% $73.00 $24 61 Permit Amendment/Time Extension 1/2 of current fee each NA NA 1/2 of current fee $0 62 Appeals - by non-applicant resident $608.00 each $7,745.51 92% $608.00 $0 63 Appeals - by applicant or non-resident 1/2 of current fee each NA NA 1/2 of current fee $0 64 Community Development Director $287.00 per hour $309.47 0% $309.00 $22 65 Planning Manager $220.00 per hour $258.13 0% $258.00 $38 Agenda Packet Page 158 of 293

PLANNING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 66 Senior Planner $200.00 per hour $197.34 0% $197.00 -$3 67 Associate Planner $110.00 per hour $148.81 1% $148.00 $38 68 Assistant Planner $101.00 per hour NA NA $101.00 $0
69 Massage Operator's Permit $612.00 each $425.88 0% $425.00 -$187 70 Massage Operator's Permit Renewal New each $74.40 1% $74.00 NA 71 Cannabis Operating Permit As needed to cover the cost of application Deposit account NA NA
As needed to cover
the cost of
application
$0
72 Inclusionary Zoning
73 Inclusionary Zoning In-lieu Fee - 9 or more rental units $20.00 per habitable square foot NA NA $21.00 $1 74 Inclusionary Zoning In-lieu Fee - 10 or more "for sale" units $25.00 per habitable square foot NA NA $26.00 $1
75 Inclusionary Zoning In-lieu Fee for combined rental and "for sale" projects
To be determined by City
Staff based on square
footage of each type
To be determined by City
Staff based on square
footage of each type.

NA NA
To be determined by
City Staff based on
square footage of
each type
$0
76 Inclusionary Monitoring: Rental $1,687.00 annually per project NA NA $1,733.00 $0 77 Inclusionary Monitoring: Ownership $2,812.00 per project NA NA $2,888.00 $0 78 Inclusionary Housing Agreement $787.00 per project NA NA $808.00 $0 79 Design Review and Signs
80 Residential - 1 unit $959.00 each $2,320.53 0% $2,320.00 $1,361 81 Residential - Minor $959.00 each $1,278.89 0% $1,278.00 $319 82 Residential - 2 - 4 units $3,474.00 each $4,398.23 0% $4,398.00 $924 83 Residential - 5 - 10 units $5,763.00 each $7,683.00 0% $7,683.00 $1,920 84 Residential - 11+ units $8,597.00 each $10,442.26 0% $10,442.00 $1,845 85 Nonresidential - 1 - 2,500 s.f. $2,127.00 each $3,455.50 0% $3,455.00 $1,328 86 Nonresidential - 2,501 - 10,000 s.f. $4,244.00 each $5,186.23 0% $5,186.00 $942 87 Nonresidential - 10,000+ s.f. $7,421.00 each $9,920.62 0% $9,920.00 $2,499 88 Administrative Design Review $2,127.00 each $2,294.80 0% $2,294.00 $167 89 Permanent signs conforming to sign regulations $668.00 each $704.36 0% $704.00 $36 90 Temporary signs $62.00 each $97.14 0% $97.00 $35
91 Sidewalk Sign Permit (only) $62.00 each $97.14 0% $97.00 $35 92 Variances
93 Variance - Residential $5,468.00 each $5,947.49 0% $5,947.00 $479 94 Variance - Nonresidential $8,247.00 each $8,533.09 0% $8,533.00 $286 95 Miscellaneous
96 Notice of Exemption
Cost of filing with agency
plus one hour of senior
planner time
each County Clerk Filing Fees NA NA
Cost of filing with
agency plus one hour
of senior planner
time
$0
97 Landscape Consultant or Design Consultant
Consultant costs, plus City
administrative fee (30% of
consultant cost)
each NA NA
Consultant costs, plus
City administrative
fee (30% of
consultant cost)
$0
98 Document Library and Associated Fees
99 Electronic Media-CD (of Plans etc.) $23.00 each $47.80 2% $47.00 $24 Agenda Packet Page 159 of 293

PLANNING
Item No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 100 Laserfiche/Archiving $3.00 per page/sheet $3.00 0% $3.00 $0 101 Zoning Map $17.00 each $28.90 3% $28.00 $11
102 General Plan Map $17.00 each $28.90 3% $28.00 $11
103 Specific Plan $246.00 each $216.90 0% $216.00 -$30
104 Urban Greening Plan $161.00 each $132.00 0% $132.00 -$29 105 Active Transportation Plan $161.00 each $132.00 0% $132.00 -$29 106 General Plan $56.00 each $46.00 0% $46.00 -$10
107 Use Permits
108 Use Permit Residential - 1 unit $2,239.00 each Projects deemed minor by Development Service Manager $3,619.17 0% $3,619.00 $1,380 109 Use Permit Residential - 2-4 units $3,751.00 each $5,495.70 0% $5,495.00 $1,744 110 Use Permit Residential - 5-10 units $4,754.00 each $5,981.05 0% $5,981.00 $1,227 111 Use Permit Residential - 11+ units $5,756.00 each $6,967.75 0% $6,967.00 $1,211 112 Administrative Use Permit $1,236.00 each $1,292.64 0% $1,292.00 $56 113 Temporary Use Permit $1,124.00 each $1,215.30 0% $1,215.00 $91 114 Address Asssignment Request $473.00 $555.74 0% $555.00 $82 Note: Fees are based on the City's Cost Allocation Study to cover the cost of processing applications for all projects. The Planning Manager may determine a project to be unusually complex or time consuming and require a deposit at the time of application for estimated staff, consultant, and City Attorney costs. If a standard fee has previously been paid, additional deposits may be required to cover extraordinary costs resulting from unforeseen complexities, delays or extra meetings. Hourly staff costs are based on employee wages and benefits, overhead, equipment and supervision, as determined by the City’s Cost Allocation Study. Charges for third-party consultants will equal actual contract costs plus 30% administrative charge. Fees for entitlements requiring a public hearing and other similar applications include one review of the initial application submittal and review of up to two resubmittals. Review of additional resubittals will incur additional fees based on staff time.

Agenda Packet Page 160 of 293

BUILDING
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 1 MECHANICAL, ELECTRICAL, & PLUMBING (MEP Permit Issuance Fees) 2 Permit Issuance Fee (applies to all MEP permits) $149.00 each permit $153.31 0% $153.00 $4 3 MECHANICAL PERMIT FEES
4 Stand alone Mechanical Plan Check $260.00 per hour or fraction thereof $291.97 0% $291.00 $31
5 Minimum Mechanical Permit for Miscellaneous Work $87.00 each $191.66 0% $191.00 $104 6 A/C (residential) $131.00 each $153.33 0% $153.00 $22 7 Furnaces (FAU, floor) $146.00 each $153.33 0% $153.00 $7 8 Heater (wall) $180.00 each $234.73 0% $234.00 $54
9 Appliance Vent/Chimney (only) $87.00 each $153.33 0% $153.00 $66 10 Refrigeration Compressor $131.00 each $153.33 0% $153.00 $22 11 Boiler - <2,000k BTU $146.00 each $153.33 0% $153.00 $7 12 Boiler - greater than 2,000k BTU $260.00 each $268.33 0% $268.00 $8 13 Chiller $131.00 each unit $153.33 0% $153.00 $22
14 Central Heating System - New (includes duct, gas piping, electric, etc.) $260.00 each $268.33 0% $268.00 $8 15 Fan Coil Unit $87.00 each $115.00 1% $114.00 $27
16 Heat Pump (package unit) $131.00 each $153.33 0% $153.00 $22 17 Heater (unit, radiant, etc.) $180.00 each $115.00 1% $114.00 -$66 18 Air Handler w/ducts more to 10k CFM $87.00 each $115.00 1% $114.00 $27 19 Air Handler w/ducts more than 10k CFM $87.00 each $115.00 1% $114.00 $27 20 Duct Work only each outlet/register $45.00 each $115.00 1% $114.00 $69 21 Evaporative Cooler $87.00 each $115.00 1% $114.00 $27 22 Make-up Air System $131.00 each $153.33 0% $153.00 $22 23 Moisture Exhaust Duct (clothes dryer) $87.00 each $115.00 1% $114.00 $27 24 Variable Air Volume Box (including duct work) $131.00 each $153.33 0% $153.00 $22 25 Vent Fan (single duct) $87.00 each $115.00 1% $114.00 $27 26 Vent System $131.00 each $153.33 0% $153.00 $22
27 Exhaust Hood and Duct (residential) $87.00 each $115.00 1% $114.00 $27 28 Exhaust Hood - Type I (commercial grease hood) $174.00 each $651.65 0% $651.00 $477 29 Exhaust Hood - Type II (commercial steam hood) $131.00 each $191.66 0% $191.00 $60 30 Non-Residential Incinerator $433.00 each $421.66 0% $421.00 -$12 31 Refrigerator Condenser Remote $260.00 each $268.33 0% $268.00 $8 32 Walk-In Box/Refrigerator Coil $131.00 each $153.33 0% $153.00 $22 33 New Mini Split Duct New $229.99 0% $229.00 NA
34 New Mini Split Ductless New $191.66 0% $191.00 NA
35 Other Mechanical Inspections (min.1/2 hr increments or fraction thereof) $214.00 per hour $191.66 0% $191.00 -$23 36 PLUMBING / GAS PERMIT FEES
37 Stand Alone Plumbing Plan Check $260.00 per hour or
fraction thereof $291.97 0% $291.00 $31
38 Minimum Plumbing Permit for Miscellaneous Work $87.00 each $191.66 0% $191.00 $104 39 Fixtures (each three) $131.00 each 3 or
fraction thereof $115.00 1% $114.00 -$17
40 Gas System (one outlet) $131.00 one only $153.33 0% $153.00 $22 41 Gas System (first five outlets) $174.00 first five $191.66 0% $191.00 $17 42 Gas Outlets (each additional) $29.00 each above the
first 5 $24.53 2% $24.00 -$5
43 Gas Test (stand alone or re-test) $131.00 each occurrence $115.00 1% $114.00 -$17 44 Building Sewer $87.00 each $153.33 0% $153.00 $66
Agenda Packet Page 161 of 293

BUILDING
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 45 Grease Trap $131.00 each $153.33 0% $153.00 $22
46 Ejector Pump $131.00 each $153.33 0% $153.00 $22
47 Backflow Preventer (first five) $131.00 first five $115.00 1% $114.00 -$17 48 Backflow Preventer (>5) $29.00 each above the
first 5 $76.66 1% $76.00 $47
49 Roof Drain - Rainwater System $87.00 each $153.33 0% $153.00 $66 50 Water Heater (new and replacements) $87.00 each $153.33 0% $153.00 $66 51 Water Pipe Repair/Replacement per dwelling unit $174.00 each $115.00 1% $114.00 -$60 52 Water Service $87.00 each $115.00 1% $114.00 $27
53 Drain-Vent Repair/Alterations $87.00 each main or
branch line $115.00 1% $114.00 $27
54 Drinking Fountain $87.00 each $115.00 1% $114.00 $27 55 Graywater Systems $174.00 each system $191.66 0% $191.00 $17 56 Swimming Pool Piping and Gas $260.00 each pool $268.33 0% $268.00 $8 57 Medical Gas System (each outlet) $260.00 each outlet $268.33 0% $268.00 $8 58 Sump Pump $131.00 each $191.66 0% $191.00 $60
59 Private Storm Drainage System (each inlet) $87.00 each inlet $115.00 1% $114.00 $27 60 Other Plumbing and Gas Inspections (min. 1/2 hr increments or fraction thereof) $214.00 per hour $191.66 0% $191.00 -$23 61 ELECTRICAL PERMIT FEES
62 Stand Alone Electrical Plan Check $260.00 per hour or fraction thereof $291.97 0% $291.00 $31
63 Minimum Electrical Permit for Miscellaneous Work $87.00 each $191.66 0% $191.00 $104 64 Single Phase Service (per 100 amps) $87.00 per 100 amps $153.33 0% $153.00 $66 65 Three Phase Service (per 100 amps) $131.00 per 100 amps $153.33 0% $153.00 $22 66 Electrical Subpanel with subfeed $87.00 each $153.33 0% $153.00 $66 67 Electrical Main Panel Upgrade $232.86 $268.32 0% $268.00 $35 68 Any amp circuit first 20 $87.00 first twenty
circuits $191.66 0% $191.00 $104
69 Any amp circuit each additional 20 $15.00 each add'l circuit > 20 $115.00 1% $114.00 $99
70 Temporary Service $87.00 each $115.00 1% $114.00 $27 71 Temporary Pole $87.00 each $115.00 1% $114.00 $27
72 Light Poles Commercial - first $366.00 first pole $191.66 0% $191.00 -$175 73 Light Poles Commercial - additional $87.00 each add'l pole after the first $115.00 1% $114.00 $27
74 Pre-Inspection/consultation $131.00 each $191.66 0% $191.00 $60 75 Swimming Pool/Spa $175.00 each $191.66 0% $191.00 $16 76 Solar Photovoltaic Repairs $131.00 each $191.66 0% $191.00 $60 77 Generator Installation - Residential $400.00 each $344.99 0% $344.00 -$56 78 Generator Installation - Commercial $581.00 each $344.99 0% $344.00 -$237 79 Electrical Outlets (receptable & light fixture) $140.00 first ten $115.00 1% $114.00 -$26 80 Electrical Outlets (each additional) $15.00 each add'l outlet after 1st 10 $15.33 2% $15.00 $0
81 Whole house rewires New $268.32 0% $268.00 NA
82 Other Electrical Inspections (min. 1/2 hr increments or fraction thereof) $214.00 per hour or fraction thereof $191.66 0% $191.00 -$23
Agenda Packet Page 162 of 293

BUILDING
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 83 MISC BUILDING PERMIT FEES FOR PROJECTS NOT REQUIRING PLAN REVIEWS 84 Standard per hour rate for items not specifically covered in the fee schedule $178.00 $254.55 0% $254.00 $76 85 Earthquake mitigation inspection first hour $308.00 $306.64 0% $306.00 -$2 86 Earthquake mitigation inspection per hour after the first hour $178.00 $191.66 0% $191.00 $13 87 Fire permit handling fee $119.00 $153.31 0% $153.00 $34 88 Building permit renewal when within one year after expiration date 50% of original building fee NA NA 50% of original building fee $0
89 Building permit renewal when after one year after expiration date 100% of original building fee NA NA 100% of original building fee $0
90 Building permit re-inspection fee after 2 failed inspections of the same item(s) $178.00 $254.55 0% $254.00 $76 91 Building permit re-inspection fee when nobody is on site for the inspection and it has not been cancelled ahead of the inspector’s leaving the office. $178.00 $254.55 0% $254.00 $76 92 Emergency non-scheduled emergency inspection call-out: per hour with a 4-hour minimum $178.00 $237.68 0% $237.00 $59 93 Pre-arranged or scheduled after hours inspection paid in advance: per hour with a 2-hour minimum $178.00 $391.01 0% $391.00 $213 94 Research – per half hour or fraction thereof $89.00 $223.42 0% $223.00 $134 95 Building Permit Extension $178.00 $318.61 0% $318.00 $140 96 Building Permit Revision: per hour $178.00 $339.19 0% $339.00 $161 97 Additional plan review by consultant after the third re-check Consultant Cost plus 30% NA NA Consultant Cost plus 30% $0
98 Additional plan review by City staff after 3rd re-check: per hour $225.00 $210.58 0% $210.00 -$15 99 Soils review processing by City staff $119.00 $153.31 0% $153.00 $34 100 Soils peer review by consultant Consultant Cost plus 30% NA NA Consultant Cost plus 30% $0
101 FEMA flood zone review $662.00 $1,019.19 0% $1,019.00 $357 102 New or replacement Certificate of Occupancy $296.00 $391.12 0% $391.00 $95 103 Temporary Certificate of Occupancy: per 30-day period $296.00 $391.12 0% $391.00 $95 104 ELECTRIC VEHICLE CHARGERS
105 Residential electric vehicle level 1 or 2 charging station per each $301.00 NA NA $301.00 $0 106 MINOR REPAIRS AND ALTERATIONS
107 Miscellaneous minor bathroom/kitchen repair – 1 fixture only $362.00 $383.31 0% $383.00 $21 108 Miscellaneous minor repairs who PC and less than $10,000 valuation $362.00 $383.31 0% $383.00 $21 109 RE-ROOFS
110 Miscellaneous roof repairs not exceeding 500 sq.ft. $362.00 sq.ft. = square feet min. = minimum $191.65 0% $191.00 -$171 111 Residential re-roof not exceeding 1,500 sq.ft. $479.00 sq.ft. = square feet min. = minimum $613.30 0% $613.00 $134 112 Each additional 100 sq.ft. residential re-roof exceeding 1,500 sq.ft. $15.00 sq.ft. = square feet min. = minimum $12.27 2% $12.00 -$3 113 Commercial NOT exceeding 5,000 sq.ft. $653.00 sq.ft. = square feet min. = minimum $459.97 0% $459.00 -$194 114 RE-ROOFS
115 Commercial exceeding 5,000 sq.ft. $913.00 $574.98 0% $574.00 -$339 116 SIDING AND STUCCO
117 Siding new or replacement - any square footage $393.00 $383.31 0% $383.00 -$10 118 Stucco new or replacement $479.00 $459.97 0% $459.00 -$20 119 Each additional 400 sq.ft. stucco or fraction thereof over 400 sq.ft. $119.00 $153.33 0% $153.00 $34 120 WINDOWS AND DOORS – NON-STRUCTURAL
121 Door replacement not involving alterations to wall framing or exterior wall coverings $155.00 $153.33 0% $153.00 -$2 122 Window, sliding door, solar tube replacement – one only and no alterations to framing or exterior wall coverings $226.00 $268.31 0% $268.00 $42 Agenda Packet Page 163 of 293

BUILDING
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 123 Multiple window, sliding door, solar tube replacements – first 5 with no alterations to framing or exterior wall coverings and all done at the same time $480.00 $306.64 0% $306.00 -$174 124 Multiple window, sliding door, solar tube replacements – each additional 5 or fraction thereof above the first 5 with no alterations to framing or exterior wall coverings and all done at the same time $87.00 $229.98 0% $229.00 $142 125 RENTAL HOUSING INSPECTIONS
126 Rental Housing Inspection: Single Family per unit $296.00 $334.86 0% $334.00 $38 127 Rental Housing Inspection: Multi-family first unit $260.00 $267.51 0% $267.00 $7 128 Rental Housing Inspection: Multi-family additional units after the first $148.00 $152.86 1% $152.00 $4 129 Rental Housing Inspection: Reinspection after the first reinspection $89.00 $76.43 1% $76.00 -$13 130 Rental Housing Inspection: cancellation with less than 72-hour notice 50% of fee assessed NA NA 50% of fee assessed $0 131 Rental Housing Inspection: late payment 10% of fee billed NA NA 10% of fee billed $0 132 OTHER MISCELLANEOUS FEES AND ASSESSMENTS
133 Document imaging of plans, calculations, and other supporting documents $3.00 page $3.00 0% $3.00 $0 134 Continuing education $5.00 permit NA NA $5.00 $0
135 Planning plan review when required
20% of combined building
inspection and plan review
with a
NA NA
20% of combined
building inspection and
plan review with a
$0
136 Public Works review when required
20% of combined building
inspection and plan review
with a
NA NA
20% of combined
building inspection and
plan review with a
$0
137 Fire Department plan review when required See Fire fee schedule NA NA See Fire fee schedule $0 138 SPA Specific Plan maintenance fee – Construction of new residential units (per unit) $206.00 unit NA NA $206.00 $0 139 SPA Specific Plan maintenance fee – New non-residential buildings and additions to existing non-residential buildings (per newly created sq.ft) $0.19 sq.ft. NA NA $0.19 $0 140 General Plan Update Fee New % of Building
Permit

2.4% 0% 2.4% NA
141 MISC BUILDING PERMIT FEES FOR PROJECTS REQUIRING A PLAN REVIEW 142 MISCELLANEOUS PROJECTS
143 Standard Hourly Rate $199.00 $199.04 0% $199.00 $0
144 Antenna - residential HAM or CB $695.00 $777.42 0% $777.00 $82 145 Equipment Container/Building (Prefab) / Residemtial Elevators $1,006.00 $892.40 0% $892.00 -$114 146 Free-standing cellular building, antenna, and building site $1,409.00 $1,096.35 0% $1,096.00 -$313 147 New cellular antenna and supporting equipment added to existing site $359.00 $470.75 0% $470.00 $111 148 Light pole or telephone pole mounted cellular 5G equipment $230.00 $191.66 0% $191.00 -$39 149 Awning or Canopy $514.00 $394.09 0% $394.00 -$120
150 Commercial Coach (per unit) $671.00 $470.76 0% $470.00 -$201 151 Commercial Vapor Recovery Systems $653.00 $624.09 0% $624.00 -$29 152 Demolition – whole or partial when exterior walls are removed $381.00 $355.77 0% $355.00 -$26 153 Demolition surcharge when PCB mitigation is involved $275.00 $317.43 0% $317.00 $42 154 Flagpole $407.00 $432.43 0% $432.00 $25
155 ACCESSORY STRUCTURES
156 Accessory Structure/Storage shed – unfinished interior and no MEP $645.00 $700.75 0% $700.00 $55 157 Carport not exceeding 400 sq.ft. $732.00 $624.09 0% $624.00 -$108 Agenda Packet Page 164 of 293

BUILDING
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 158 New Garage (detached or attached) (unfinished inside and only 1 electrical circuit) $905.00 $892.42 0% $892.00 -$13 Agenda Packet Page 165 of 293

BUILDING
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 159 ACCESSORY DWELLING UNITS
160 New attached or detached accessory dwelling units – each 300 sq.ft. or fraction thereof. Includes 1 kitchen and 1 bathroom. $1,649.00
New or conversion accessory
dwelling units employing Universal
Design will receive a 25% discount off
the above ADU fees.
$1,541.08 0% $1,541.00 -$108
161 Conversion of existing space into an accessory dwelling unit – each 300 sq.ft. or fraction thereof. Includes 1 kitchen and 1 bathroom. $1,187.00
New or conversion accessory
dwelling units employing Universal
Design will receive a 25% discount off
the above ADU fees.
$1,203.92 0% $1,203.00 $16
162 ALTERATIONS/ADDITIONS/REPAIRS
163 Room additions of 300 sq. ft. or less without engineered calculations without a kitchen or bathroom $1,193.00 $1,150.92 0% $1,150.00 -$43 164 Room addition of 300 sq. ft. or less with engineered calculations without a kitchen or bathroom $1,271.00 $1,150.92 0% $1,150.00 -$121 165 Room additions per additional 100 sq.ft. > 300 sq.ft. with or without engineered calculations. $318.00 $344.99 0% $344.00 $26 166 Residential remodel 300 sq. ft. or less without kitchen or bathroom remodel $957.00 $805.92 0% $805.00 -$152 167 Each additional 100 sq. ft. of residential remodel > 300 sq.ft. $167.00 $191.66 0% $191.00 $24 168 Kitchen or bathroom remodel $756.00 $767.58 0% $767.00 $11 169 Each additional kitchen or bathroom remodel when work is done at the same time as the first $378.00 $344.99 0% $344.00 -$34 170 New bathroom or kitchen added to existing dwelling or new/existing accessory structure $780.00 $844.26 0% $844.00 $64 171 New or remodel commercial bathroom $1,110.00 $1,081.09 0% $1,081.00 -$29 172 Miscellaneous bathroom/kitchen repair involving only 1 fixture with plan review $345.00 NA NA $345.00 $0 173 Foundation repair (non-engineered) of 100 linear feet or less $625.00 $614.26 0% $614.00 -$11 174 Foundation repair (engineered) of 100 linear feet or less $843.00 $614.26 0% $614.00 -$229 175 Each additional 100 lin. ft. foundation repair (engineered or non- engineered) exceeding the first 100 l.f.. $178.00 $191.66 0% $191.00 $13 176 Commercial and residential interior partitions not exceeding 30 linear feet $476.00 $537.60 0% $537.00 $61 177 Each additional 30 lin. ft. of partition exceeding first 30 l.f. $114.00 $115.00 1% $114.00 $0 178 New masonry fireplace when allowed by BAAQMD $796.00 $844.26 0% $844.00 $48 179 Pre-fabricated metal fireplace that is EPA compliant $666.00 $537.60 0% $537.00 -$129 180 Fireplace demolition $476.00 $384.27 0% $384.00 -$92 181 Miscellaneous minor and structural repairs, alterations, dry rot/termite repairs of $10,000 valuation or less and requiring plan review $758.00 $517.23 0% $517.00 -$241
182 Dry rot/termite damage, miscellaneous alterations, and structural repairs of greater than $10,000 valuation must use Valuation Table as for new construction.
183 Residential Drainage - French Drain/Sump Pump $407.00 $422.61 0% $422.00 $15 184 Building permit fees include inspection and permit issuance. 185 Plan review fees 65%
of the building
permit fees and
are in addition
to the building
permit fee
NA NA 65% $0
186 The fees below are per each occurrence or unit unless otherwise noted and include any associated plumbing, electrical, and/or mechanical work. 187 PROJECT TYPES
188 DECKS, BALCONIES, PATIOS, PORCHES
189 New decks and balconies not exceeding 100 sq.ft. $614.00 $547.42 0% $547.00 -$67 190 New decks and balconies not exceeding 500 sq.ft. $863.00 $700.75 0% $700.00 -$163 191 Each additional 100 sq. ft. of new deck or balcony exceeding 500 sq. ft. $266.00 $145.66 0% $145.00 -$121 192 Deck and balcony repairs of 100 sq. ft. or less $435.00 $470.76 0% $470.00 $35 193 Deck and balcony repairs of greater than $10,000 valuation must use the Valuation Table as for new construction. 194 Covered porch $504.00 $537.60 0% $537.00 $33
195 Patio or deck cover – wood or metal frame not exceeding 300 sq.ft. $512.00 $537.60 0% $537.00 $25 196 Each additional 300 sq.ft. of patio or deck cover exceeding 300 sq.ft. $157.00 $153.33 0% $153.00 -$4 Agenda Packet Page 166 of 293

BUILDING
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 197 Patio room constructed of wood or metal frame not exceeding 300 sq.ft. $764.00 $767.59 0% $767.00 $3 198 Each additional 300 sq.ft. of patio room exceeding the first 300 sq.ft. $371.00 $191.66 0% $191.00 -$180 199 ELECTRIC VEHICLE CHARGING
200 Commercial electric vehicle charging station – one only $625.00 $575.94 0% $575.00 -$50 201 Each Commercial EV charging station when 2 to 4 are installed at the same site $316.00 $498.32 0% $498.00 $182 202 Each Commercial EV charging station when 5 or more installed at the same site $210.00 $574.99 0% $574.00 $364 203 FENCES
204 Fences or free-standing non-masonry walls 7 to 10 ft. high and not exceeding 100 linear feet $445.00 $422.61 0% $422.00 -$23 205 Each additional 100 lin. ft. of 6 to 10 feet high non-masonry fences or free- standing walls exceeding the first 100 lin. ft. $139.00 $115.00 1% $114.00 -$25
206 Fences or free-standing masonry walls less than 10 feet high and not exceeding 100 linear feet $905.00 $882.59 0% $882.00 -$23 207 Each additional 100 lin. ft. of less than 10 feet high masonry free-standing fences or walls exceeding the first 100 lin. ft. $166.00 $191.66 0% $191.00 $25
208 RETAINING WALLS
209 Retaining Wall: Standard Design Non-Engineered not exceeding 50 linear feet $586.00 $460.93 0% $460.00 -$126 210 Each additional 50 l.f. non-engineered retaining wall exceeding 50 l.f. $144.00 $115.00 1% $114.00 -$30 211 Retaining Wall: Engineered 3-10' High not exceeding 50 linear feet $991.00 $690.93 0% $690.00 -$301 212 Each additional 50 l.f. eng. 3’-10’ high retaining wall exceeding 50 l.f. $199.00 $115.00 1% $114.00 -$85 213 Retaining Wall: Engineered over 10' High retaining wall not exceeding 50 l.f. $1,271.00 $844.26 0% $844.00 -$427 214 Each additional 50 l.f. eng. over 10’ high retaining wall exceeding 50 l.f. $279.00 $153.33 0% $153.00 -$126 215 ROOFS
216 Roof structure replacement not exceeding 100 sq.ft. $476.00 $422.61 0% $422.00 -$54 217 Each additional 100 sq.ft. roof structure replacement exceeding 100 sq.ft. $108.00 $115.00 1% $114.00 $6 218 SEISMIC IMPROVEMENT
219 Engineered or non-engineered seismic retrofit/structural strengthening $616.00 $652.60 0% $652.00 $36 220 Engineered or non-engineered seismic retrofit/structural strengthening when using Planset A or conforming to Existing Building Code appendix chapter A3 $308.00 $499.27 0% $499.00 $191 221 SIGNS
222 Structural Signs such as monument or large signs attached to a building, etc. $616.00 $652.60 0% $652.00 $36 223 Non-structural signs such as individual lettering attached to building, etc. $407.00 $422.61 0% $422.00 $15 224 Additional fee for each illuminated sign $86.00 $115.00 1% $114.00 $28 225 SOLAR ENERGY & BATTERY STORAGE
226 Solar Photovoltaic up to 15 kW $450.00 NA NA $450.00 $0 227 Solar PV each 15KW or fraction thereof over 15 kW, Plus $15 per kW for each kW over 15 kW $276.00 NA NA $276.00 $0 228 Solar Thermal (solar water heating) up to 30 kWth $331.00 $344.98 4% $331.00 $0 229 Solar Thermal each 30kWth or fraction thereof over first 30 kWth $165.00 $191.65 14% $165.00 $0 230 Residential battery storage systems $287.00 NA NA $287.00 $0 231 STORAGE RACKS
232 Storage Racks: 0-5' high not exceeding 100 l.f. $407.00 $422.61 0% $422.00 $15 233 Storage Racks: Greater than 5 feet and up to 8 feet high not exceeding 100 l.f. $476.00 $422.61 0% $422.00 -$54 234 Storage Racks: Greater than 8 feet high and not exceeding 100 l.f. $586.00 $499.27 0% $499.00 -$87 235 Each additional 100 l.f. of storage regardless of height $144.00 $115.00 1% $114.00 -$30 236 SWIMMING POOLS, SPAS, HOT TUBS, SAUNAS
237 Prefabricated Spa or Hot Tub $411.00 $345.94 0% $345.00 -$66 238 Sauna or Steam Room added to existing or new/addition construction $552.00 $575.94 0% $575.00 $23 239 Swimming Pool - Residential $732.00 $729.26 0% $729.00 -$3 240 Swimming Pool – Commercial not exceeding 800 sq. ft. $1,566.00 $1,419.25 0% $1,419.00 -$147 241 Each additional 100 sq. ft. commercial pool exceeding 800 sq. ft. $180.00 $191.66 0% $191.00 $11 Agenda Packet Page 167 of 293

BUILDING
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 242 TENANT IMPROVEMENTS
243 Office tenant improvements – minimum for T.I. not exceeding 500 sq. ft. $2,010.00 $1,817.17 0% $1,817.00 -$193 244 Each additional 100 sq. ft. or fraction thereof of office T.I. exceeding 500 sq.ft. $175.00 $178.82 0% $178.00 $3 245 Retail tenant improvements – minimum for T. I. not exceeding 500 sq. ft. $2,169.00 $1,817.17 0% $1,817.00 -$352 246 Each additional 100 sq.ft. or fraction thereof retail T.I. exceeding 500 sq.ft. and not exceeding 25,000 sq. ft. $127.00 $140.49 0% $140.00 $13 247 Each additional 100 sq.ft. or fraction thereof retail T.I. exceeding 25,000 sq.ft. $61.00 $45.71 2% $45.00 -$16 248 Restaurant tenant improvement – minimum for T.I. not exceeding 750 sq.ft. $2,751.00 $2,277.16 0% $2,277.00 -$474 249 Each additional 100 sq.ft. or fraction thereof restaurant T.I. exceeding 750 sq.ft. $224.00 $198.76 0% $198.00 -$26 250 WINDOWS, SKYLIGHTS, DOORS
251 New door cut into an existing wall $357.00 $383.31 0% $383.00 $26 252 First replacement window or sliding glass door -structural with exterior surface break-out and/or frame modification $356.00 $383.31 0% $383.00 $27
253 Each additional replacement structural window or sliding glass door when work is performed at the same time as the first $70.00 $130.32 0% $130.00 $60
254 Skylights: New or replacement not exceeding 10 sq.ft. $264.00 $384.27 0% $384.00 $120 255 Skylights: New or replacement and/or structural exceeding 10 sq.ft. $340.00 $422.61 0% $422.00 $82 256 ADDITIONAL FEES - OTHER MANDATED BUILDING PERMITS
257 Construction Tax, ECMC 4.36.010 for new construction and additions 1/2 or 1% of permit value % of total permit fee
SMIP, CBSC, and STMP Fees are
collected by, but not set by the City NA NA 1/2 or 1% of permit value $0 258 Art in Public Places, ECMC 13.50 for projects $250,000 or more 1% of project cost NA NA 1% of project cost $0 259 Calif. Strong Motion Instrumentation Program
260 Category 1 Construction (1 to 3 Story Residential) const. value x .00013 (.50 minimum) NA NA const. value x .00013 $0 261 Category 2 (OVER 3 story Residential and ALL Commercial) const. value x .00028 (.50 minimum) NA NA const. value x .00028 $0 262 Calif. Building Standards Commission
263 $1 - $25,000 Permit Valuation $1.00 NA NA $1.00 $0
264 $25,001 - $50,000 $2.00 NA NA $2.00 $0
265 $50,001 - $75,000 $3.00 NA NA $3.00 $0
266 $75,001 - $100,000 $4.00 NA NA $4.00 $0
267 Every $25,000 or fraction above $100,000 Add $1 NA NA Add $1 $0 268 West Contra Costa Transportation Advisory Committee, Subregional Transportation Mitigation Program (STMP)** UPDATED FEES FOR FY2025-2026
269 single family residential $6,964.00 per dwelling unit NA NA $6,908.00 -$56 270 multi-family residential $3,431.00 per dwelling unit NA NA $3,404.00 -$27 271 senior housing $1,881.00 per dwelling unit NA NA $1,866.00 -$15 272 Hotel $4,457.00 per room NA NA $4,421.00 -$36
273 Retail $8.44 per square foot NA NA $8.37 $0
274 Office $11.17 per square foot NA NA $11.08 $0
275 industrial $7.12 per square foot NA NA $7.06 $0
276 storage facility $0.98 per square foot NA NA $0.97 $0 Agenda Packet Page 168 of 293

BUILDING
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 277 Other* (as determined by Public Works) $9,411.00 per AM peak hour trip
Notes: *Applies to development
projects that do not clearly conform
to one of the defined residential or
nonresidential categories and is likely
to be applicable only in exceptional
cases. In such cases, consult the
STMP Administrative Guidelines.

NA NA $9,336.00 -$75
278 **STMP & TIF are increased yearly based on the San Francisco region February ENR Construction Cost Index (SFCCI) increase as compared to the prior February rate. Accessory Dwelling Units (ADU) are not required to pay STMP & TIF fees. 279 Transportation Impact Fee (TIF)
280 RESIDENTIAL
281 Single Family $4,172.00 per dwelling unit NA NA $4,172.00 $0 282 Multi-Family $2,920.30 per dwelling unit NA NA $2,920.30 $0 283 NONRESIDENTIAL
284 Commercial $5.62 per square foot NA NA $5.62 $0
285 Hotel/Motel $4.59 per square foot NA NA $4.59 $0
286 Office $4.84 per square foot NA NA $4.84 $0
287 Industrial $3.05 per square foot NA NA $3.05 $0
288 Other* to be determined
Note: * Applies to development
projects that do not clearly conform
to one of the defined residential or
nonresidential categories and is likely
to be applicable only in exceptional
cases. In such cases, consult the
Transportation Impact Fee
Administrative Guidelines.

NA NA to be determined $0
289 Penalty: Violations for Construction and Debri:
290 First Violation New NA NA $100.00 NA
291 Second Violation New NA NA $500.00 NA
292 Third Violation New NA NA $1,000.00 NA
Agenda Packet Page 169 of 293
Minimum Value Maximum Value
Current Base
Rate
Suggested Base
Rate
Current
Plus $$
Suggested
Plus $$ For every
$1 $800 $141.68 $145.82 $0.00 $0.00 $0
$801 $3,000 $141.68 $145.82 $12.59 $12.99 $100
$3,001 $38,000 $419.32 $431.57 $55.79 $57.43 $1,000
$38,001 $75,000 $2,372.17 $2,441.46 $41.29 $42.45 $1,000 $75,001 $150,000 $3,898.11 $4,011.97 $28.26 $29.08 $1,000 $150,001 $750,000 $6,017.48 $6,193.25 $22.60 $25.12 $1,000 $750,001 $1,500,000 $20,663.03 $21,266.60 $19.17 $18.25 $1,000 $1,500,001 $10,000,000 $33,963.28 $34,955.35 $16.42 $16.90 $1,000 $10,000,001 and up $173,536.48 $178,605.50 $7.34 $7.55 $1,000 Percent Change = 3%
Cost Recovery Level = 100%

NEW CONSTRUCTION AND OTHER FEES BASED ON VALUATION
The following table is used to calculate permit (Issuance and Inspection) fees based on the valuation of all new residential, commercial, and industrial construction either not covered in or referenced by the Miscellaneous Building Permit Fee table. Valuation will be determined by the 1997 UBC Valuation Table and adjusted by the S.F.

Bay Area Engineering News Record Construction Cost Index increase from 1997 to June 2023 or by actual contract price when the type of construction is not represented in the Valuation Table. Plan review is additional and is calculated at 65% of the established permit fee. Plan Review Fee for modular/factory built housing is charged at 10% less than the Plan Review fee for site-built projects.

Agenda Packet Page 170 of 293
Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft

3.3% New per/sqf 3.3% New per/sqft 3.3% New per/sqft 3.3% New per/sqft Type I-A or II-A* 279.85 9.32 289.17
Type V-B - Wood
Frame 236.44 7.87 244.32 Type I-A or II-A 298.12 9.93 308.04 Type III-A 250.15 8.33 258.48 Type V-A Masonry (or
Type III) 227.31 7.57 234.88
Type V-B- Wood Frame
(Engrd) 260.43 8.67 269.10 Type II-A 218.16 7.26 225.43 Type III -B 241.01 8.03 249.03 Type V-B - Wood
Frame 210.17 7.00 217.17 Type V-B - Masonry 247.87 8.25 256.12 Type II -B 207.89 6.92 214.81 Type V-A 228.44 7.61 236.05 Type I Basement
Garage 95.95 3.20 99.15 Basements 0.00 0.00 0.00 Type III-A 230.73 7.68 238.42 Type V-B 219.31 7.30 226.61 Type V-A 229.58 7.65 237.23 Semi Finished 59.40 1.98 61.38 Type III -B 219.31 7.30 226.61 Unfinished 45.69 1.52 47.21 Type V-A 217.02 7.23 224.25 Type V-B 207.89 6.92 214.81
Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft

3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf Type I or II-A 268.42676 8.94 277.37 Type I-A or II-A 293.55 9.78 303.33 Type I-A or II-A* 306.12 10.19 316.31 Type I-A & B 285.56 9.51 295.07 Type II-B 194.17316 6.47 200.64 Type II -B 181.62 6.05 187.67 Type IIA 236.44 7.87 244.32 Type II-A 194.17 6.47 200.64 Type III -A 204.15615 6.80 210.95 Type III-A 211.31 7.04 218.35 Type II -B 225.02 7.49 232.51 Type III-A 207.88 6.92 214.80 Type III -B 164.04889 5.46 169.51 Type III -B 202.18 6.73 208.91 Type III-A 255.86 8.52 264.38 Type III -B 199.88 6.66 206.54 Type V-A 195.30759 6.50 201.81 Type V-A 197.60 6.58 204.18 Type III -B 238.73 7.95 246.68 Type V-A 195.31 6.50 201.82 Type V-B 182.75667 6.09 188.84 Type V-B 187.33 6.24 193.57 Type V-A 230.73 7.68 238.41 Type V-B 186.17 6.20 192.37 Type V-B 222.73 7.42 230.15
Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft

3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf Type I-A or II-A* 379.25 12.63 391.88 Type I-A or II-A 266.14 8.862 275.00 Type I-A or II-A* 274.40 9.14 283.54 Type II -B 172.47 5.74 178.21 Type II-A 279.98 9.32 289.30 Type II-A 266.14 8.862 275.00 Type II-A 182.93 6.09 189.03 Type III-A 179.33 5.97 185.30 Type II -B 271.06 9.03 280.08 Type II -B 206.74 6.885 213.63 Type II -B 175.13 5.83 180.96 Type V-A 153.06 5.10 158.16 Type III-A 308.40 10.27 318.67 Type III-A 225.02 7.493 232.51 Type III-A 198.55 6.61 205.16 Canopies 71.96 2.40 74.35 Type III -B 298.12 9.93 308.05 Type III -B 215.88 7.189 223.07 Type III -B 189.63 6.31 195.94 Type V-A 279.84 9.32 289.16 Type V-A 217.02 7.227 224.25 Type V-A 185.17 6.17 191.33 Type V-B 267.28 8.90 276.18 Type V-B 210.17 6.999 217.17 Type V-B 175.13 5.83 180.96 Type V-B 175.13 5.83 180.96
Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft

3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf Type II-A 130.21811 4.34 134.55 Type I-A or II-A 249.31 8.30 257.62 Type V-B - Wood
Frame 59.40 1.98 61.38 Type I-A or II-A* 211.31 7.04 218.35 Type II -B 122.2203 4.07 126.29 Type III-A 215.26 7.17 222.43 Type V-B - Masonry: 64.50 2.15 66.65 Type II-A 129.07 4.30 133.37 Type III-A 142.77812 4.75 147.53 Type III -B 213.60 7.11 220.71 Carport 35.40 1.18 36.58 Type II -B 126.79 4.22 131.01 Type III -B 132.49364 4.41 136.91 Type V-A 195.32 6.50 201.82 Type III-A 157.62 5.25 162.87 Type V-A 95.95136 3.20 99.15 Type V-B 191.89 6.39 198.28 Type III -B 147.35 4.91 152.25 Type V-A 132.50 4.41 136.92
Type V-B 122.22 4.07 126.29
Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft

3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf Type I-A or II-A 254.71 8.48 263.20 Type I-A or II-A 146.20 4.87 151.07 Type I-A or II-A* 316.00 10.52 326.52 Type I-A or II-A 280.98 9.36 290.34 Type II-A 190.75 6.35 197.11 Type II -B 93.66 3.12 96.78 Type II-A 255.54 8.51 264.05 Type III-A 204.46 6.81 211.27 Type II -B 182.63 6.08 188.71 Type III-A 111.94 3.73 115.66 Type II -B 244.13 8.13 252.26 Type III -B 195.23 6.50 201.73 Type III-A 207.89 6.92 214.81 Type III -B 105.09 3.50 108.59 Type III-A 265.80 8.85 274.65 Type V-A 193.04 6.43 199.47 Type III -B 198.75 6.62 205.37 Tilt-Up 76.53 2.55 79.08 Type III -B 256.68 8.55 265.22 Type V-B 182.76 6.09 188.84 Type V-A 194.18 6.47 200.64 Type V-A 105.09 3.50 108.59 Type V-A 242.99 8.09 251.08 Type V-B 182.76 6.09 188.84 Type V-B 95.95 3.20 99.15 Type V-B 235.00 7.83 242.82 FY 2025-26
Incr/Decr Incr/Decr Incr/Decr Incr/Decr
CHURCHES (A-3 OCC) INDUSTRIAL, FACTORIES (F-1, F-2
OCC) PUBLIC BUILDINGS (A-3, B OCC) THEATERS (A-1 OCC)
BOWLING ALLEYS (A-3 OCC) HOTELS AND MOTELS (R-1 OCC) PRIVATE GARAGES (U OCC) STORES (M OCC) Occupancy/Type per/sqft
FY 2025-26 FY 2025-26 FY 2025-26
Occupancy/Type per/sqft
FY 2025-26 FY 2025-26 FY 2025-26 FY 2025-26
Incr/Decr Incr/Decr Incr/Decr Incr/Decr
FY 2025-26
Incr/Decr Incr/Decr Incr/Decr Incr/Decr
BANKS (B OCC) CARE FACILITIES (R-4, R-2, R-3.1
OCC) OFFICES (B OCC)** SERVICE STATIONS (Special OCC)
AUDITORIUMS (A-3 OCC) FIRE STATIONS (Essential
Services) MEDICAL OFFICES (B OCC) SCHOOLS (E OCC)
FY 2025-26 FY 2025-26 FY 2025-26
FY 2025-26 FY 2025-26 FY 2025-26 FY 2025-26
Incr/Decr Incr/Decr Incr/Decr Incr/Decr
Incr/Decr Incr/Decr Incr/Decr Incr/Decr
APARTMENT BUILDINGS (R-2
OCC) DWELLINGS R-3 OCC) LIBRARIES (A-3 OCC) RESTAURANTS (A-2, B OCC)

BUILDING VALUATION TABLE DATA
Fore referrence only the following building valuation data are based on the 1997 Uniform Building Code and adjusted with 1.33 S.F. Bay Area modifier based on ENR construction cost index 1997-2025 FY 2025-26 FY 2025-26 FY 2025-26 FY 2025-26
Agenda Packet Page 171 of 293

BUILDING VALUATION TABLE DATA
Fore referrence only the following building valuation data are based on the 1997 Uniform Building Code and adjusted with 1.33 S.F. Bay Area modifier based on ENR construction cost index 1997-2025 Occupancy/Type per/sqft Occupancy/Type per/sqft Occupancy/Type per/sqft

3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf 3.3% New per/sqf Type I-A or II-A* 356.38 11.87 368.24 Type I-A or II-A 407.78 13.58 421.36 Type I-A or II-A* 120.82 4.02 124.84 Type I-A or II-A 126.78 4.22 131.00 Type II-A 247.87 8.25 256.12 Type III-A 372.36 12.40 384.76 Type I-A or II-B Open
Parking* 90.06 3.00 93.06 Type V-A 75.38 2.51 77.89
Type III-A 253.58 8.44 262.02 Type V-A 279.85 9.32 289.16 Type II -N 70.03 2.33 72.36 Type II-B or V-B 70.82 2.36 73.18 Type V-A 238.73 7.95 246.68 Type III 1-Hour 91.16 3.04 94.19 Type III-A 84.53 2.81 87.34 Type III -N 81.28 2.71 83.98 Type III -B 81.09 2.70 83.79 Type V 1-Hour 83.46 2.78 86.24
* Add 0.5 percent to total cost for each story over 3
** Deduct 20 percent for shell only buildings
*** Deduct 11 percent for mini-warehouses
FY 2025/26 Note: Increases are based on the Engineering News Record Construction Cost Index increase for the San Francisco Bay Area as of April 2025.

CONVALESCENT HOSPITALS (I-2
OCC) JAILS PUBLIC GARAGES (S2) WAREHOUSES (S1, S2)***
Occupancy/Type per/sqft
FY 2025-26 FY 2025-26 FY 2025-26 FY 2025-26
Incr/Decr Incr/Decr Incr/Decr Incr/Decr
Agenda Packet Page 172 of 293

PUBLIC WORKS
Item
No. Title Current Fee/Charge Unit Full Cost Subsidy % Proposed Fee Fee Δ 1 Grading
2 Plan Check
3 50 to 10,000 CY (no permit required below 50 CY) $581.00 each $913.40 0% $913.00 $332 4 10,001 to 100,000 CY $807.00 each $1,108.21 0% $1,108.00 $301 5 Add for each 10,000 CY above 100,000 $193.00 10,000 CY $328.97 0% $328.00 $135 6 Permit Issuance $120.00 each $232.23 0% $232.00 $112
7 Permit Bond $5.74 per CY NA NA $5.91 $0
8 Inspection (C.6 inspections separately listed in "Erosion & Clean Water Section") (No permit required below 50 CY) 9 50 to 10,000 CY (up to 8 inspections; any additional inspections will be charged at hourly rate) $1,041.00 each $1,462.87 0% $1,462.00 $421 10 10,001 to 100,000 CY (up to 15 inspections, add'l inspections will be charged at hourly rate) $2,095.00 each $2,536.12 0% $2,536.00 $441 11 Add for each 10,000 CY above 100,000 $129.00 10,000 CY $231.56 0% $231.00 $102 12 Grading Work Started Prior to Obtaining a Permit
Double the Plan Check,
Permit Issuance Fee and
Inspection Fee
NA NA Double the Plan Check, Permit Issuance
Fee and Inspection Fee $0
13 Encroachments
14 Permit Issuance Fee (all permits except planting of street trees) $120.00 each $183.53 0% $183.00 $63 15 Permit Renewal Fee/Time Extension or Sub-Permit $60.00 each $91.76 1% $91.00 $31 16 Permit bond/deposit (except street tree permit)
17 One-year maintenance bond for 25 sf street cuts for the amount of the value of the work or as determined by City Engineer. $1,945.00 minimum $4,674.38 0% $4,674.00 $2,729 18 Bond for concrete work, including curb, gutter and sidewalk drains.

Deposit is equal to the value of the work for up to 40 sf or as determined by City Engineer. Deposit is returned upon passing final inspection for concrete work.
$823.00 minimum $3,392.38 0% $3,392.00 $2,569
19 One-year maintenance bond for storm drainage modifications equal to the value of the work or as determined by City Engineer. minimum 20 Permit Types (also subject to the Issuance Fee (#2)
21 Concrete Flat Work or Under Sidewalk Drain - up to 500 s.f. (includes two inspections) $331.00 each $404.35 0% $404.00 $73
22 ADD for each add'l 500 s.f. $79.00 500 s.f. $174.00 0% $174.00 $95 23 Street cut or drainage modifications (< 10 C.Y. excavated) (includes two inspections) $360.00 each $404.35 0% $404.00 $44
24 ADD for each add'l 10 CY. $268.00 10 CY $178.43 0% $178.00 -$90 25 Traffic Control Plan Review $297.00 each $512.49 0% $512.00 $215 26 Work in Public Right-of-Way Started Prior to Obtaining a Permit Double the Permit Issuance Fee and Inspection Fee NA NA
Double the Permit Issuance Fee and
Inspection Fee $0
27 Revocable Encroachment Permit/Hold Harmless Agreement $425.00 each $484.60 0% $484.00 $59 28 Storage in Public ROW for Moving Pods and Portable Toilets (East Bay Sanitary dumpsters exempt; storage pods for residential moving exempt from bond deposit)
$91.00 per one week $125.30 0% $125.00 $34
29 Moratorium Street Restoration Fee for Street cuts not exceeding 5' x 5'; Restoration for street cuts larger than 5' x 5' on a moratorium street will be calculated by the City Engineer based on recent bid costs for annual City slurry seal projects
$847.00 each $974.00 0% $974.00 $127
Agenda Packet Page 173 of 293

PUBLIC WORKS
Item
No. Title Current Fee/Charge Unit Full Cost Subsidy % Proposed Fee Fee Δ
30 Re-inspection/Additional Inspection (for reasons such as work not ready for a scheduled inspection, work done without an inspection, work partially completed or annual permit inspection)
$91.00 each $241.08 0% $241.00 $150
31 Traffic Striping Restoration -Thermoplastic Pavement Legends (includes removal and replacement and related contract work) $370.00 each $300.00 0% $300.00 -$70 32 Traffic Striping Restoration -Thermoplastic 4" Line (includes removal and replacement and related contract work) $9.18 LF $4.80 17% $4.00 -$5 33 Traffic Striping Restoration -Thermoplastic 12' Line (includes removal and replacement and related contract work) $6.88 LF $12.00 0% $12.00 $5 34 Traffic Striping Restoration -Thermoplastic Detail 22 (includes removal and replacement and related contract work) $4.59 LF $6.00 0% $6.00 $1 35 Pavement Marker Restoration - Caltrans Type AY Pavement Reflective Markers (includes replacement and related contract work) $9.18 each $48.00 0% $48.00 $39 36 Utility Pole - Set, Relocate or Remove $321.00 each $512.49 0% $512.00 $191 37 Temporary Construction Parking for vehicles that have commercial license plates and Limited Construction Equipment Storage (includes construction parking permit)
$298.00 per week $241.08 0% $241.00 -$57
38 Transportation Permit - Per Calif. State Vehicle Code Section 35795 $16.00 per trip NA NA $16.00 $0 39 Haul Route Impact Fees
40 For qualifying projects as determined by the City Engineer, Haul Route Fees are charged on the following costs per square yard of pavement per PCI point drop in each 500-foot long section of haul route. For haul routes in use for over one year, a PCI discount will be applied against the PCI change as listed below. If the Post-construction PCI is higher than the Pre-construction PCI, the PCI change shall be considered to be zero. The final PCI value will determine the category of the fee charged.
41 Arterial
42 100<pci<70 $0.35 NA NA $0.36 $0.01
43 69<pci<50 $0.99 NA NA $1.02 $0.03
44 49<pci<25 $1.01 NA NA $1.04 $0.03
45 24<pci<0 $1.78 NA NA $1.83 $0.05
46 Collector
47 100<pci<70 $0.35 NA NA $0.36 $0.01
48 69<pci<50 $0.82 NA NA $0.84 $0.02
49 49<pci<25 $1.01 NA NA $1.04 $0.03
50 24<pci<0 $1.78 NA NA $1.83 $0.05
51 Residential
52 100<pci<70 $0.27 NA NA $0.28 $0.01
53 69<pci<50 $0.77 NA NA $0.79 $0.02
54 49<pci<25 $0.92 NA NA $0.95 $0.03
55 24<pci<0 $1.53 NA NA $1.58 $0.05
56 PCI Discount
57 100<pci<70 2.2 pts/year NA NA 2.2 pts/year $0
58 69<pci<50 2.7 pts/year NA NA 2.7 pts/year $0
Agenda Packet Page 174 of 293

PUBLIC WORKS
Item
No. Title Current Fee/Charge Unit Full Cost Subsidy % Proposed Fee Fee Δ 59 49<pci<25 3.3 pts/year NA NA 3.3 pts/year $0
60 24<pci<0 3.6 pts/year NA NA 3.6 pts/year $0
61 Parking Controls
62 Appeal of No Parking/Stopping Anytime Zones $632.00 each $1,115.71 0% $1,115.00 $483 63 Red curb marking next to residential driveway (Subject to City Engineer approval of Resident Request) $429.00 each $515.00 0% $515.00 $86 64 Temporary No Parking/Stopping Anytime Signs (Encroachment Permit Issuance Fee also applies) $8.00 each $8.00 0% $8.00 $0 65 Temporary Barricades
66 Pick-up/drop-off by City crew $152.00 per pick-up/drop-off $179.78 0% $179.00 $27 67 Replacement $117.00 per barricade $100.00 0% $100.00 -$17 68 Street Tree Permits
69 Street Tree Planting by Property Owner (Includes planting permit, site approval, and planting inspection) $59.00 per 1-3 trees $533.37 0% $533.00 $474 70 Street Tree Maintenance Bond - Required three-year refundable maintenance bond for when property owner plants new Street Trees to cover Staff time needed to rehabilitate or remove a tree that has not been properly maintained.
$112.00 per tree, refundable after 3- year
health verification $177.79 0% $177.00 $65
71 New Street Tree Planting and Related Work by City (Includes permit, one 15-gallon tree, planted, staked, and mulched, and comes with watering bag. Requires signed City Tree Care Agreement) $354.00 per tree $1,306.96 0% $1,306.00 $952
72 Concrete Removal for Tree Well $219.00 per 16 s. f. $655.58 0% $655.00 $436 73 Concrete Removal for Tree Well (per s.f. after first 16 s.f. removal) $14.00 per s.f. $25.00 0% $25.00 $11 74 Maintenance to Establish New Tree - Three-year maintenance fee when City is establishing new tree without a City Tree Care Agreement, usually in case of mitigation for street tree removal and planting in a different location that the responsible property owner is not able to maintain.
$917.00 per tree $1,266.96 0% $1,266.00 $349
Agenda Packet Page 175 of 293

PUBLIC WORKS
Item
No. Title Current Fee/Charge Unit Full Cost Subsidy % Proposed Fee Fee Δ 75 Vegetation removal by City $75.00 per 24 sq ft or less $775.02 0% $775.00 $700 76 Street Tree Replacement by City (replace existing street tree with a suitable street tree subject to City approval) New minimum $773.58 0% $773.00 NA 77 Permit for Street Tree Pruning or Removal by Property Owner or Utility Company (includes inspection by Program Manager) $236.00 minimum $355.58 0% $355.00 $119 78 Bond for Street Tree Pruning, Protection, or Removal by Property Owner or Utility Company $286.00 minimum NA NA $294.58 $9 79 Violation for Unauthorized Street Tree Pruning, Mutilation or Removal (i.e., work without a Permit) 80 0-5.99 inch $520.00 Tree Diameter @ 4.5 feet NA NA $535.60 $16 81 6.0-11.99 inch $780.00 Tree Diameter @ 4.5 feet NA NA $803.40 $23 82 12.0-17.99 inch $1,040.00 Tree Diameter @ 4.5 feet NA NA $1,071.20 $31 83 18.0-23.99 inch $1,560.00 Tree Diameter @ 4.5 feet NA NA $1,606.80 $47 84 24 inch and greater $2,080.00 Tree Diameter @ 4.5 feet NA NA $2,142.40 $62 85 Erosion and Clean Water
86 Stormwater Pollution Prevention Construction Permit: C.6 Inspections (Permits for construction projects that require Stormwater Pollution Prevention, includes monthly inspection) 87 Less than 1-acre hillside site, requiring an erosion and sediment control plan $368.00 $484.60 0% $484.00 $116
88 More than an acre, requiring an erosion and sediment control plan $736.00 $850.32 0% $850.00 $114 89 Re- Inspections (Due to Fail in maintaining BMP's) $183.00 $493.45 0% $493.00 $310 90 C.3 Fees for projects which create or replace more than 10,000 square feet of impervious surface 91 Stormwater Control Plan Review/Approval (Collected by Planning Dept at initial submittal) $587.00 each $718.59 0% $718.00 $131 92 Operations & Maintenance Plan Review/Approval (O&M Plan to include Maintenance Agreement and description of annual inspection fees) (Collected by Building Dept at plan check submittal) $0.05 per square feet of impervious surface $582.00 0% $582.00 $582 93 Annual Inspection Fee-Collected by Public Works Department as described in Maintenance Agreement (Includes max of one field inspection. Additional re-inspection will be charged additional inspection fee)
$481.00 up to 25,000 sf $696.02 0% $696.00 $215
Agenda Packet Page 176 of 293

PUBLIC WORKS
Item
No. Title Current Fee/Charge Unit Full Cost Subsidy % Proposed Fee Fee Δ 94 Annual Inspection Fee-Collected by Public Works Department as described in Maintenance Agreement $962.00 more than 25,000 sf $1,159.14 0% $1,159.00 $197 95 Miscellaneous
96 Illicit Discharge Response / Hazardous Materials Spill Clean-Up - costs to include supervision, reporting, overhead, equipment, hourly wages and fringe benefits of the employees involved
$1,417.00 per response, per day $1,910.97 0% $1,910.00 $493 97 Public Works Hourly Rates (for other Services Not Specified) 98 Public Works Director $339.00 hourly $359.04 0% $359.00 $20 99 Management Assistant $120.00 hourly $116.45 0% $116.00 -$4 100 Engineering Manager/Senior Engineer $254.00 hourly NA NA $261.62 $8 101 Operations + Environmental Services Division Manager $243.00 hourly $225.44 0% $225.00 -$18 102 Programs Manager/Analyst $236.00 hourly $166.19 0% $166.00 -$70 103 Associate Engineer $198.00 hourly $194.81 0% $194.00 -$4 104 Operations Supervisor $236.00 hourly $152.25 0% $152.00 -$84 105 Technician/Inspector $183.00 hourly $134.16 0% $134.00 -$49 106 Maintenance Worker / Recycling Maintenance Worker $152.00 hourly $103.66 1% $103.00 -$49 107 Admin Clerk Specialist $100.00 hourly $99.15 0% $99.00 -$1 108 Environmental Specialist $156.00 hourly $133.10 0% $133.00 -$23 109 Bid Protest Fee $608.00 $1,340.59 0% $1,340.00 $732 110 Recycling + Environmental Services
111 Construction Waste Management Plan Review Fee $250.10 per plan review, inclusive of pre plan and post report $363.82 0% $363.00 $113
112 Solid Waste Collection and Disposal Subscription Exemption Application Fee $312.00 per application $665.50 0% $665.00 $353 113 Recycling + Environmental Resource Center Tour Fee $156.00 per tour, excluding free monthly tours $99.15 0% $99.00 -$57 114 Citywide Garage Sale Listing $25.00 per registration $66.55 61% $25.75 $1 115 Solid Waste Event Stands Rental (set of three - Recycling, Compost, and Garbage) $57.00 per event $225.44 0% $225.00 $168
Note: Hourly rates are based on the
City's Cost Allocation Study. The Public
Works Director may determine a
permit application to be unusually
complex or time consuming and use
consultants for review and inspection.

Charges for consultants will equal
actual contract costs plus 30%
administrative charge
Agenda Packet Page 177 of 293

PUBLIC WORKS
Item
No. Title Current Fee/Charge Unit Full Cost Subsidy % Proposed Fee Fee Δ 116 Solid Waste Event Stand Replacement $83.00 per stand $135.00 0% $135.00 $52 117 Compact Fluorescent Bulb (CFL) and LED Bulb Recycling * $4.00 per bulb NA NA $4.12 $0 118 Fluorescent Tube Recycling * $0.72 per linear foot NA NA $0.74 $0 119 CFL & Tube Large Quantity (over 15 CFLs and/or 30 feet) Recycling $14.00 additional flat fee NA NA $14.42 $0 120 Sharps Disposal* $4.00 per disposal NA NA $4.12 $0
121 Pharms Disposal* $4.00 per disposal NA NA $4.12 $0
122
Cardboard, Paper, Books, Magazines, and Newspaper Recycling Dropoff - for amounts greater than 1 cubic yard (~26 bankers boxes) ** (minimum charge $8)
$8.00 per cubic yard NA NA $8.24 $0
Note: Citywide Fees apply. Credit Card Transaction Fees are per transaction. *No cost for residents in RecycleMore service area. Proof of residency required ** No cost for El Cerrito rate payers. City reserves the right to reject large quantities. Proof of residency required ***Includes market rate sale of salvaged materials plus processing fee Agenda Packet Page 178 of 293
FIRE
Item
No. Title
Current
Fee/Charge Unit Full Cost Subsidy % Proposed Fee Fee Δ
1 Occupancy Inspection Fees
2 Fire Safety Inspection: Annual Inspection plus one (1) re-inspection $319.07 Each $611.42 41% $361.00 $42 3 Educational Inspection-Public Schools (Group E): Annual Inspection plus one (1) re-inspection N/A Each $115.63 100% N/A $0 4 Educational Inspection-Private Schools (Group E): Annual Inspection plus one (1) re-inspection $335.30 Each $346.89 0% $346.00 $11 5 Hotels & Apartments (Group R-1): < 15 Units Annual Inspection plus one (1) re-inspection $210.91 Each $578.15 0% $578.00 $367 6 Hotels & Apartments (Group R-1): 15-99 Units Annual Inspection plus one (1) re-inspection $502.94 Each $553.59 0% $553.00 $50 7 Hotels & Apartments (Group R-1): 100-249 Units Annual Inspection plus one (1) re-inspection $659.78 Each $830.39 0% $830.00 $170 8 Hotels & Apartments (Group R-1): 250 or more Units Annual Inspection plus one (1) re-inspection $854.46 Each $1,107.19 0% $1,107.00 $253 9 Residential (R-3) Single Family Requested Fire Safety Inspection N/A Each NA NA N/A $0 10 Day Care (Group R-3): Annual Inspection plus one (1) re-inspection $335.30 Each $231.26 0% $231.00 -$104 11 Additional Reinspections $221.73 Each $115.63 1% $115.00 -$107 12 Operational Permits & Inspection Fees
13 Assembly Permit: Requires Fire Safety Inspection $104.92 Each $276.80 0% $276.00 $171 14 Christmas Tree Lot Operation Permit $335.30 Each $276.80 0% $276.00 -$59 15 Compressed Gas Permit: Requires Occupancy Inspection $104.92 Each $115.63 1% $115.00 $10 16 Demolition Permit: Includes pre and post inspections $670.59 Each $553.59 0% $553.00 -$118 17 Dry Cleaning Permit: Requires Fire Safety Inspection $104.92 Each $115.63 1% $115.00 $10 18 Fire Alarm Annual Inspection: Requires Occupancy Inspection $104.92 Each $276.80 29% $195.50 $91 19 Food Booth Permit $335.30 Each $276.80 0% $276.00 -$59 20 Hood & Duct Annual Inspection: Requires Fire Safety Inspection $104.92 Each $276.80 0% $276.00 $171 21 Model Rocket Permit N/A Each NA NA N/A $0
22 Repair Garage Permit: Requires Occupancy Inspection $104.92 Each $231.26 15% $195.50 $91 23 Open Burning Permit: Residential N/A Each NA NA N/A $0 24 Sprinkler & Standpipe Annual Inspection: Requires Occupancy Inspection $104.92 Each $231.26 0% $231.00 $126 25 Membrane Structure, Tent or Canopy Permit $341.79 Each $553.59 0% $553.00 $211 26 Welding & Cutting Permit: Requires Occupancy Inspection $104.92 Each $231.26 0% $231.00 $126 27 Miscellaneous No- Action Permits N/A Each NA NA N/A $0 28 Plan Review
29 Preliminary Plan Review: Residential Remodel (1-2 family units) $436.97 Each $914.72 0% $914.00 $477 30 Preliminary Plan Review: Residential/ADU (1-2 family units) $573.25 Each $609.81 0% $609.00 $36 31 Preliminary Plan Review: Commercial (including multi-family/apartment/condo/townhouse) $791.73 Each $914.72 0% $914.00 $122 32 New Construction Plan Check & One Site Inspection (< 4999 sq. ft.) $554.86 Each $914.72 0% $914.00 $359 33 New Construction Plan Check & Site Inspection (>5000 sq. ft., each add'l 1000 sq. ft.) $219.56 Each $304.91 0% $304.00 $84 34 Additional Site Inspections $210.91 Each $276.80 0% $276.00 $65 Agenda Packet Page 179 of 293
FIRE
Item
No. Title
Current
Fee/Charge Unit Full Cost Subsidy % Proposed Fee Fee Δ
35 Fire Alarm System Plan Review: First 25 Devices $436.97 Each $609.81 0% $609.00 $172 36 Fire Alarm System Plan Review: each additional 25 Devices or Portion Thereof $136.28 Each $304.91 0% $304.00 $168 37 Fire Alarm System On Site Inspection: First 25 Devices $354.76 Each $415.19 0% $415.00 $60 38 Fire Alarm System Inspection: each additional 25 Devices or Portion Thereof $136.28 Each $276.80 29% $195.50 $59 39 Hood & Duct Plan Review and One Field Inspection $491.05 Each NA NA $491.05 $0 40 Medical Gas Plan Review and One Field Inspection $491.05 Each $231.26 0% $231.00 -$260 41 Sprinkler System Plan Review: Residential- First 25 Heads (New or Modify 1 -2 family units) $436.97 Each $914.72 0% $914.00 $477 42 Sprinkler System Plan Review: Residential- Each Additional 25 Heads (New or Modify) $218.48 Each $304.91 0% $304.00 $86 43 Sprinkler Systems Field Inspections Residential: Rough in & Final - First 25 heads $354.76 Each $553.59 0% $553.00 $198 44 Sprinkler Systems Field Inspections Residential: Rough in & Final - Each Additional 25 heads $136.28 Each $276.80 29% $195.50 $59 45 Sprinkler System Plan Review: Commercial (New)- First 25 Heads (includes multi-family) $655.45 Each $914.72 0% $914.00 $259 46 Sprinkler System Plan Review: Commercial (New)- Each Additional 25 Heads or Portion Thereof $218.48 Each $304.91 0% $304.00 $86 47 Sprinkler Systems Field Inspections Commercial: First 25 heads $573.25 Each $830.39 0% $830.00 $257 48 Sprinkler Systems Field Inspections Commercial: Each Additional 25 heads $210.91 Each $276.80 0% $276.00 $65 49 Underground Review and Inspection $136.28 Each $231.26 0% $231.00 $95 50 Standpipe System Plan Review & Inspection $763.61 Each $346.89 0% $346.00 -$418 51 Additional Risers $136.28 Each $231.26 0% $231.00 $95 52 Fire Pumps & Related Equipment Plan Review and Two Field Inspections (Acceptance) $491.05 Each $346.89 0% $346.00 -$145 53 Hydrant Water Flow Test for Sprinkler Calculations (per Test) $210.91 Each $462.52 0% $462.00 $251 54 Emergency Responder Radio Communication System (ERRCS) Plan Review & Inspection $491.05 Each $914.72 0% $914.00 $423 55 Vegetation Management
56 Vegetation Management Parcel Inspection - First Inspection N/A Each $138.40 100% N/A $0 57 Additional Inspections $136.28 Each $276.80 29% $195.50 $59 58 Vegetation Abatement Fees Actual Cost +
10%
Each NA NA Actual Cost + 10% $0
59 Court Fees
Actual Cost +
10%
Each NA NA Actual Cost + 10% $0
60 CERT Classes
61 CPR Classes - El Cerrito & Kensington Residents $59.49 Each NA NA $59.49 $0 62 First Aid - El Cerrito & Kensington Residents $59.49 Each NA NA $59.49 $0 63 CPR Classes - Non- Residents $70.30 Each NA NA $70.30 $0 64 First Aid - Non-Residents $70.30 Each NA NA $70.30 $0 65 False Alarms
66 1st False Alarm N/A Each NA NA N/A $0
67 2 or Over False Alarms in 12 months New Each NA NA $300.00 NA Agenda Packet Page 180 of 293
FIRE
Item
No. Title
Current
Fee/Charge Unit Full Cost Subsidy % Proposed Fee Fee
Δ
68 Fire Department Hourly Rates
69 Fire Apparatus Response or Standby Charge per hour (Engine) $432.64 Per Hour $611.42 0% $611.00 $178 70 Fire Apparatus Response or Standby Charge per hour (Truck) $540.80 Per Hour $611.42 0% $611.00 $70 71 Fire Apparatus Response or Standby Charge per hour (Command) $216.32 Per Hour $304.91 0% $304.00 $88 72 Fire Investigation per hour (plus costs) $429.40 Per Hour $304.91 0% $304.00 -$125 73 Fire Chief - ST $218.48 Per Hour $344.53 0% $344.00 $126 74 Fire Chief - OT $327.72 Per Hour $516.80 0% $516.00 $188 75 Battalion Chief - Training - ST $138.44 Per Hour $304.91 0% $304.00 $166 76 Battalion Chief - Training - OT $207.67 Per Hour $152.45 0% $152.00 -$56 77 Battalion Chief - ST $144.93 Per Hour $304.91 0% $304.00 $159 78 Battalion Chief - OT $217.40 Per Hour $457.36 0% $457.00 $240 79 Captain-Fire Prevention - ST $136.28 Per Hour $276.80 0% $276.00 $140 80 Captain-Fire Prevention - OT $204.42 Per Hour $415.19 0% $415.00 $211 81 Captain-Paramedic - ST $128.71 Per Hour $255.35 0% $255.00 $126 82 Captain-Paramedic - OT $192.52 Per Hour $383.02 0% $383.00 $190 83 Captain - ST $117.89 Per Hour $235.83 0% $235.00 $117 84 Captain - OT $176.30 Per Hour $117.91 1% $117.00 -$59 85 Engineer/Paramedic - ST $113.57 Per Hour $218.12 0% $218.00 $104 86 Engineer/Paramedic - OT $170.89 Per Hour $327.18 0% $327.00 $156 87 Engineer - ST $104.92 Per Hour $194.98 1% $194.00 $89 88 Engineer - OT $157.91 Per Hour $97.49 1% $97.00 -$61 89 Firefighter/Paramedic - ST $76.79 Per Hour $186.18 0% $186.00 $109 90 Firefighter/Paramedic - OT $114.65 Per Hour $279.27 0% $279.00 $164 91 Firefighter - ST $59.49 Per Hour $161.10 0% $161.00 $102 92 Firefighter - OT $88.69 Per Hour $241.65 0% $241.00 $152 93 Fire Executive Assistant - ST $62.73 Per Hour $115.63 1% $115.00 $52 94 Fire Executive Assistant - OT $94.10 Per Hour $173.44 0% $173.00 $79 95 SB 38 INSPECTION $252.45 Per Hour $304.91 0% $304.00 $52 Agenda Packet Page 181 of 293
POLICE
Item
No. Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 1 Services & Fees
2 Fingerprinting, Solicitor or other (plus Department of Justice Fees*) $51.00 per set NA NA $51.00 $0
3 Citation Sign-offs—Resident $0.00 per citation $40.65 100% $0.00 $0 4 Citation Sign-offs—Non-Resident $26.00 per citation $40.65 38% $25.00 -$1 5 VIN Verification $53.04 per verification $81.29 32% $55.00 $2 6 Alcohol Beverage Control One Day License $53.04 per letter $119.06 54% $55.00 $2 7 False Alarm Response (1st incident) $0.00 each NA NA $0.00 $0 8 False Alarm Response (2nd through 5th incident) $95.68 each NA NA $95.00 -$1 9 False Alarm Response (6th and subsequent incidents) $205.92 each NA NA $205.00 -$1 10 Non-permitted Alarms $137.28 each NA NA $137.00 $0
11 Vehicle Removal/Vehicle Release Fee [Towed vehicles
abandoned or stored on a public street and vehicles towed pursuant to 14602.6; 14607.6; 22651(b),(d), (e), or (h) through (r); 22651.3, 22651.5, 22651.5 (a); 22652.5;22658; 22660; or 22669 of the California Vehicle Code]
$171.60 per release $236.66 0% $236.00 $64
12 DUI Cost Recovery Fee* ($1,000 maximum) Actual cost to max
per 30 min
increments NA NA Actual cost to max $0
13 Firearm Storage Fee $27.04 initial NA NA $27.00 $0
14 Firearm Storage Fee $1.04 per day NA NA $1.00 $0
15 Weapons Seizure, Storage & Return $214.24 each $405.07 46% $220.00 $6 16 Reports, Photocopies & Records
17 Clearance Letter $27.04 each NA NA $27.00 $0
18 Report Copy $7.28 $8.00 0% $8.00 $1
19 Traffic Collision Report Copy $7.28 per report $8.00 0% $8.00 $1 20 Police Photographs, audio tapes & videotapes & CDs $37.44 actual cost + fee $46.93 15% $40.00 $3
21 Permits
22 Concealed Weapons Permit (plus Department of Justice Fees*) $410.00 each Determined by State $725.65 0% $725.00 $315 23 Peddler/Solicitor Permit $448.24 each $298.94 0% $298.00 -$150 Agenda Packet Page 182 of 293
POLICE
Item
No. Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 24 Permit to Sell Firearms—Initial Permit $391.04 each $453.17 12% $400.00 $9 25 Permit to Sell Firearms—Annual Renewal $192.40 each $221.82 10% $200.00 $8 26 Second-Hand Dealer's Permit $551.20 each $298.94 0% $298.00 -$253 Agenda Packet Page 183 of 293
POLICE
Item
No. Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 27 Bingo Permit $237.12 each $144.71 0% $144.00 -$93
28 Alarm Permit - Residential and Commercial $36.40 each $51.29 22% $40.00 $4 29 Alarm Permit Renewal $20.80 each $25.64 22% $20.00 -$1 30 Block Party Permit $50.96 each $119.06 58% $50.00 -$1 31 Parade Permit $328.64 each actual cost +
fee $2,420.28 86% $330.00 $1
32 Street Closure Permit $90.48 each $222.72 60% $90.00 $0 33 Police Department Hourly Rates
34 Police Chief -ST $234.71 hourly $373.67 0% $373.00 $138 35 Police Chief - OT $351.52 hourly $560.50 0% $560.00 $208 36 Police Captain - ST $228.22 hourly $279.95 0% $279.00 $51 37 Police Captain - OT $341.79 hourly $419.93 0% $419.00 $77 38 Police Lieutenant - ST $199.01 hourly $308.46 0% $308.00 $109 39 Police Lieutenant - OT $297.44 hourly $462.69 0% $462.00 $165 40 Police Sergent/Investigations Assignment-ST $163.32 hourly $264.74 0% $264.00 $101 41 Police Sergent/Investigations Assignment-OT $244.44 hourly $397.11 0% $397.00 $153 42 Police Corporal - ST $129.79 hourly $189.94 0% $189.00 $59 43 Police Corporal - OT $194.69 hourly $94.97 1% $94.00 -$101 44 Police Officer - ST $84.36 hourly $162.59 0% $162.00 $78 45 Police Office - OT $126.55 hourly $243.88 0% $243.00 $116 46 Records Supervisor - ST $96.26 hourly $142.84 1% $142.00 $46 47 Records Supervisor - OT $144.93 hourly $214.26 0% $214.00 $69 48 Police Executive Assistant - ST $55.16 hourly $102.58 1% $102.00 $47 49 Police Executive Assistant - OT $83.28 hourly $153.87 1% $153.00 $70 50 Senior Records Specialist- ST $74.63 hourly $97.03 0% $97.00 $22 51 Senior Records Specialist - OT $112.49 hourly $145.55 0% $145.00 $33 52 Police Records Specialist - ST $60.57 hourly $93.86 1% $93.00 $32 53 Police Records Specialist - OT $91.94 hourly $140.79 1% $140.00 $48 54 Cadet - ST $24.88 hourly $103.66 1% $103.00 $78
55 Cadet - OT $37.86 hourly $51.83 2% $51.00 $13
56 Parking Violation Fines
57 Obstruction or interference with Officers $104.00 11.12.020 NA NA $104.00 $0 58 Barriers & Signs $98.80 11.28.040b NA NA $100.00 $1
59 City Parking Lot $78.00 11.40.020 NA NA $80.00 $2
60 Parking on Sidewalk or Curb Prohibited $76.96 11.40.030 NA NA $80.00 $3 61 Vehicle Storage-Parking in excess of 72 hours $86.32 11.40.050a NA NA $80.00 -$6 62 Vehicle Storage-Trailer Parked on Street Overnight $78.00 11.40.050c NA NA $80.00 $2 Agenda Packet Page 184 of 293
POLICE
Item
No. Title
Current
Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 63 Vehicle Storage-Parking for the purpose of engaging in vehicle sale $68.64 11.40.050d NA NA $80.00 $11
64 Parking for Certain Purposes-On Street for Sale $102.96 11.40.060a NA NA $80.00 -$23 65 Parking for Certain Purposes-on Street for Repairs $86.32 11.40.060b NA NA $80.00 -$6 66 Parking for Certain Purposes-on Street when charging for washing/polishing $86.32 11.40.060c NA NA $80.00 -$6
67 Parking Regulations in Certain Zones $86.32 11.40.070 NA NA $80.00 -$6 68 Angle and Parallel Parking Signs-Loading Clearance between Vehicle and Street $78.00 11.40.080b NA NA $80.00 $2
69 Angle and Parallel Parking Signs-Loading Clearance between other Street $78.00 11.40.090a NA NA $80.00 $2
70 Loading and Unloading-Angle to Curb $78.00 11.40.090b NA NA $80.00 $2 71 Grades-Wheels not Turned $86.32 11.40.100 NA NA $80.00 -$6 72 Emergency Parking Signs $78.00 11.40.130b NA NA $80.00 $2 73 Curb Markings $78.00 11.40.160b NA NA $80.00 $2
74 Bus Zone $260.00 11.40.190e NA NA $260.00 $0
75 Parking-Limited Time $78.00 11.40.210 NA NA $80.00 $2 76 Parking-Prohibited during Certain Hours $78.00 11.40.230 NA NA $80.00 $2 77 Parking-Prohibited at all Times $78.00 11.40.240 NA NA $80.00 $2 78 Parking on Private Property $78.00 11.44.040 NA NA $80.00 $2 79 Violations Designated-4 Hour Permit Parking $99.84 11.68.050a NA NA $100.00 $0 80 Any ECMC parking violation not listed above shall be subject to a civil penalty $78.00 NA NA $80.00 $2
81 Curfew Violation Fines
82 Daytime (8:00 am - 2 pm) 1st offense $66.00 NA NA $66.00 $0 83 Daytime (8:00 am - 2 pm) 2nd offense within one year $131.00 NA NA $131.00 $0 84 Daytime (8:00 am - 2 pm) 3rd offense within one year of 2nd offense $260.00 NA NA $260.00 $0
85 Nighttime (10:00 pm - 5 am) 1st Offense $68.00 NA NA $68.00 $0 Agenda Packet Page 185 of 293

RECREATION
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 1 Facility Rentals
2 Community Center
Minimum Rental
Time (Fri-Sun); 5
Hours
Maximum Advance Reservation: 12
Months Resident, Non-Profit or CoSponsored Group; 10 Months NonResident or Commercial; 12 months Annual Rentals.
3 Social Hall
4 Resident (includes Skylight Room, Kitchen and Courtyard) $222.00 per hour NA NA $231.00 $9 5 Additional Hours for Set-Up & Clean-Up (max. 3 hours) 25% per hour discount of rental fee NA NA 25% $0
6 Deposit (credit card only) $701.00 per event NA NA $600.00 -$101 7 Deposit (credit card only) - With Alcohol New per event NA NA $850.00 NA 8 Alcohol Service Permit $228.00 per event $150.89 9% $138.00 -$90 9 Application Fee New per application $115.68 14% $100.00 NA 10 Skylight, Garden and Patio Rooms
11 Resident $85.00 per hour NA NA $89.00 $4
12 Deposit (credit card only) $121.00 per event NA NA $126.00 $5 13 Pool View Room/Courtyard
14 Resident $46.00 per hour NA NA $48.00 $2
15 Deposit (credit card only) $125.00 per event NA NA $130.00 $5 16 Kitchen Use $63.00 per hour NA NA $66.00 $3
17 Group Picnic Areas
18 Cerrito Vista
19 Reservation—Resident $245.00 per day NA NA $245.00 $0 20 Arlington (large group area with tables & BBQ)
21 Spaces 4 & 5—Resident $182.00 per day NA NA $190.00 $8 22 Spaces 4, 5 & 6—Resident $245.00 per day NA NA $255.00 $10 23 Other Parks, picnic tables with BBQ pit
24 Resident $100.00 per day NA NA $104.00 $4
25 Other Parks, picnic tables without BBQ pit
26 Resident $85.00 per day NA NA $89.00 $4
27 Picnic Area Cleaning Deposit $60.00 per day NA NA $63.00 $3 28 Hana Gardens Senior Center
29 Combined Room - Resident $112.00 per hour NA NA $117.00 $5 30 Alcohol Service Permit $58.00 per event $57.84 1% $57.00 -$1 31 Deposit $271.00 per event NA NA $282.00 $11
32 Clubhouses
Minimum Rental
Time (Sat-Sun); 3
hours
Maximum Advance Reservation: 12
Months Resident, Non-Profit or CoSponsored Group; 10 Months NonResident or Commercial; 12 Months Annual Rentals
33 Private, Resident $90.00 per hour NA NA $94.00 $4
34 Renovated Clubhouse Private, Resident $112.00 per hour NA NA $117.00 $5 35 Deposit $271.00 per event NA NA $282.00 $11
Agenda Packet Page 186 of 293

RECREATION
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 36 Alcohol Service Permit $58.00 per event $57.84 1% $57.00 -$1 37 Art Studio Instructor $49.00 per hour NA NA $51.00 $2 38 Facility & Rental Related Fees & Discounts
39 Transfer Fee - Rooms and Clubhouses $60.00 per date NA NA $63.00 $3 40 Transfer Fee - Picnics $25.00 per date NA NA $26.00 $1 41 Late Payment Fee 15% percent NA NA 15% $0
42 City Co-Sponsored Rental Fee Discount 40% percent NA NA 40% $0 43 Non-Profit Rental Fee Discount 20% percent NA NA 20% $0 44 Governmental Agency/School District Rentals (unless specified in separate agreements)
Additional Direct
Costs (if needed) per event NA NA
Additional Direct Costs
(if needed) $0
45 Business Hours Facility Rental Discount (Mon. - Thurs. 8:30am - 4:30pm, no holidays) 15% per hour NA NA 15% $0
46 Chair Rental—Non-Profit/Co-Sponsored $6.00 each NA NA $7.00 $1 47 Table Rental—Non-Profit/Co-Sponsored $9.00 each NA NA $10.00 $1 48 Restroom Key (purchase or refundable deposit) $25.00 per key NA NA $26.00 $1 49 Storage Fee - Co-Sponsored Groups Only
50 Small Locker $412.00 per year NA NA $429.00 $17
51 Medium Locker $487.00 per year NA NA $507.00 $20
52 Large Locker $655.00 per year NA NA $682.00 $27
53 Room/Small Clubhouse $1,200.00 per year NA NA $1,248.00 $48 54 Recreation Sports Venue Rentals and Fees
55 Raquet Courts (min. 1 hour rental)
56 Tennis Resident $10.50 per hour NA NA $11.00 $0.50
57 Pickleball Resident $8.00 per hour NA NA $8.00 $0
58 Co-Sponsored $7.25 per hour NA NA $7.50 $0.25
59 Instruction Use $19.00 per hour NA NA $20.00 $1
60 City Co-Sponsored Group Team Captain Permit Fee $32.00 per season NA NA $34.00 $2 61 Tennis Transfer/Cancellation Fee $1.00 per hour NA NA $1.00 $0 62 Private Instructor Processing Fee (Tennis Certification and Insurance Required) $34.00 per year NA NA $36.00 $2
63 Light Surcharge (Cerrito Vista) $4.25 per hour NA NA $4.50 $0.25 64 Play Fields
65 Resident $34.00 per hour NA NA $36.00 $2
66 Cerrito Vista Hardball Field (2 hr. minimum)—Resident $46.00 per hour NA NA $48.00 $2 67 El Cerrito Co-Sponsored Youth Group $15.00 per hour NA NA $16.00 $1 68 Fine for violation of field policies and/or damaging fields when wet and or not playable or signs are posted. $394.00 per infraction NA NA $410.00 $16 69 Swim Center Programs/Fees * Effective September 1
70 Adult Swim Fees
71 Lap Swim/Recreation/Family Swim
72 30 Day Pass - Resident $96.00 valid 30 days NA NA $96.00 $0 73 15-Swim Pass—Resident $96.00 per pass NA NA $96.00 $0 Agenda Packet Page 187 of 293

RECREATION
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 74 Drop-In $8.00 per use NA NA $8.00 $0
75 Masters Swim Team
76 Drop-In $13.00 per use NA NA $13.00 $0
77 30 Day Pass - Resident $103.00 valid 30 days NA NA $107.00 $4 78 Masters Plus—Any Masters Workout/Lap Swim 30 Days Only 79 Monthly 30 Day Masters Plus Resident $146.00 valid 30 days NA NA $152.00 $6 80 Recreation Parent & Child Swim/Splash Park/Tot Splash 81 Drop-in
82 Adult (18+) $8.00 per use NA NA $8.00 $0
83 Youth (1-17 years) $5.00 per use NA NA $5.00 $0
84 Splash Park & Tot Splash $5.00 per use NA NA $5.00 $0 85 Non-Swimmer Fee $5.00 per use NA NA $5.00 $0
86 Organized Groups (minimum of 15) $5.00 per child NA NA $5.00 $0 87 30 Days
88 Youth—(1-17 years) Resident $63.00 valid 30 days NA NA $63.00 $0 89 15 Swim Pass
90 Youth Resident (1-17) $60.00 per pass NA NA $63.00 $3 91 Splash Park/Tot Splash 15 Swim Pass
92 Resident $50.00 per pass NA NA $63.00 $13
93 Water Aerobics Deep/Shallow
94 Drop In $13.00 per use NA NA $13.00 $0
95 10-Punch Pass - Resident $94.00 per pass NA NA $98.00 $4 96 Swim Lessons
97 Private—Resident $38.00 per class NA NA $39.00 $1
98 Semi-Private - Resident $64.00 per class NA NA $66.00 $2 99 Youth Groups—Resident $16.00 per class NA NA $17.00 $1 100 Special Arrangement Group Lesson—Resident $17.00 per class NA NA $18.00 $1 101 Teen/Adult Group Lessons - Resident $30.00 per class NA NA $32.00 $2 102 Swimming Clubs, Teams & Meets
103 El Cerrito High School Team $3,375.00 per season NA NA $3,510.00 $135 104 El Cerrito High School Team non-operating hours $36.00 per hour per staff NA NA $38.00 $2 105 Gators Swim Club
106 One Swimmer - Resident $5.50 per hour NA NA $6.00 $1 107 Each Additional Household Member Discount 10% monthly discount percent NA NA $0.10 $0 108 Swim Center Rentals
109 Long-Term Pool Rentals $19.00 per lane/ per hour NA NA $20.00 $1 110 Lane Rental Fee $24.00 per lane/ per hour NA NA $25.00 $1 111 Emery G. Weed III Lap Pool-Resident, non-operating hours, practice time $173.00 per hour NA NA $180.00 $7
112 Emery G. Weed III Lap Pool—Resident, non-operating hours, event rental $288.00 per hour NA NA $300.00 $12
113 Swim Center Rental Deposit (refundable) $124.00 per event NA NA $129.00 $5 114 Recreation Pool-Resident (1-50 people) (2-hour minimum) $202.00 per hour NA NA $210.00 $8 Agenda Packet Page 188 of 293

RECREATION
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 115 Recreation Pool-Resident (51-100 people) (2-hour minimum) $217.00 per hour NA NA $226.00 $9 116 Splash Park Rental-Resident (1-50 people) ( 2-hour minimum) $178.00 per hour NA NA $185.00 $7 117 Splash Park Rental-Resident (51-100 people) ( 2-hour minimum) $190.00 per hour NA NA $198.00 $8 118 Transfer Fee $60.00 per booking NA NA $63.00 $3
119
Picnic Area Rental During Recreation Swim (Splash Park Area & Swim Camp Lawn Area) Resident (11-20 people) - listed fee plus lifeguard rate below
$96.00 per event NA NA $99.00 $3
120 Picnic Area rental during Recreation Swim (Swim Camp Lawn Area) Resident (11-15 people) - listed fee plus lifeguard rate below $71.00 per event NA NA $74.00 $3 121 Lifeguard Fee $36.00 per hour $38.93 2% $38.00 $2
122 Miscellaneous Swim Center Fees
Annual Pass holders can use
passes on holidays, not
charged surcharge
No Residency Surcharge for Drop-In
Fees
123 Auto-Debit Pass Discount 10% per month NA NA 10% $0 124 Single Lane Program/Holiday Reservation Surcharge - Resident $3.00 per swim NA NA $3.00 $0 125 Single Lane Program/Holiday Reservation Surcharge - NonResident $5.00 per swim NA NA $5.00 $0 126 Annual Pass holders can use passes on holidays, not charged surcharge
127 Youth Programs
128 Day Camps *Effective September 1
129 City Run Camp Resident (Price based on number of days up to 5 days, hours, special events, field trips, supplies needed) $20-$598 See brochure for actual costs
NA NA $20-$622 Varies
130 Day Camp Deposit $47.00 per camp/week NA NA $49.00 $2 131 Day Camp Cancellation Fee $47.00 per camp/week NA NA $49.00 $2 132 Overnight Camp *Effective September 1
133 Camper - Resident (price depends on staffing and rental costs, duration of session and other fixed costs) $450-$1352 per session NA NA $450-$1,406 Varies 134 CIT/TILT Programs - Residents $220-$988 per session NA NA $220-$1,028 Varies 135 Deposit $156.00 per week NA NA $156.00 $0
136 Before/After School Childcare
137 5 day schedule, AM Care (~ 1.5 hours/day) $341.00 per month (10 Total) NA NA $355.00 $14 138 4 day schedule, AM Care (~1.5vhours/day) $300.00 per month (10 Total) NA NA $312.00 $12 139 3 day schedule, AM Care (~1.5 hours/day) $246.00 per month (10 Total) NA NA $256.00 $10 140 2 day schedule, AM Care (~1.5 hours/day) $178.00 per month (10 Total) NA NA $185.00 $7 141 1 day schedule, AM Care (~1.5 hours/day) $89.00 per month (10 Total) NA NA $93.00 $4 142 5 day schedule, TK/Kinder Childcare (~ 4.25 hours/day) $820.00 per month (10 Total) NA NA $853.00 $33 143 4 day schedule, TK/Kinder Childcare (~4.25 hours/day) $722.00 per month (10 Total) NA NA $750.00 $28 144 3 day schedule, TK/Kinder Childcare (~4.25 hours/day) $590.00 per month (10 Total) NA NA $614.00 $24 145 2 day schedule, TK/Kinder Childcare (~4.25 hours/day) $427.00 per month (10 Total) NA NA $444.00 $17 146 1 day schedule, TK/ Kinder Childcare (~4.25 hours/day) $214.00 per month (10 Total) NA NA $222.00 $8 147 5 day schedule, Kindergarten Childcare (~ 4 hours/day) $772.00 per month (10 Total) NA NA $803.00 $31 Agenda Packet Page 189 of 293

RECREATION
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 148 4 day schedule, Kindergarten Childcare (~4 hours/day) $679.00 per month (10 Total) NA NA $706.00 $27 149 3 day schedule, Kindergarten Childcare (~4 hours/day) $556.00 per month (10 Total) NA NA $578.00 $22 150 2 day schedule, Kindergarten Childcare (~4 hours/day) $402.00 per month (10 Total) NA NA $418.00 $16 151 1 day schedule, Kindergarten Childcare (~4 hours/day) $201.00 per month (10 Total) NA NA $209.00 $8 152 5 day schedule, 1st - 6th PM Care (~3.33 hours/day) $673.00 per month (10 Total) NA NA $699.00 $26 153 4 day schedule, 1st - 6th Care (3.33 hours/day) $592.00 per month (10 Total) NA NA $616.00 $24 154 3 day schedule, 1st - 6th PM Care (~3.33 hours/day) $484.00 per month (10 Total) NA NA $504.00 $20 155 2 day schedule, 1st - 6th PM Care (~3.33 hours/day) $350.00 per month (10 Total) NA NA $364.00 $14 156 1 day schedule, 1st - 6th PM Care (~3.33 hours/day) $175.00 per month (10 Total) NA NA $182.00 $7 157 TK & Kinder Club (~1 hour/day) $16.00 per day NA NA $17.00 $1 158 Preschool *Effective September 1
159 4 day schedule, 3 hour program $611.00 per month NA NA $636.00 $25 160 3 day schedule, 3 hour program $458.00 per month NA NA $477.00 $19 161 2 day schedule, 3 hour program $306.00 per month NA NA $318.00 $12 162 1 day schedule, 3 hour program $153.00 per month NA NA $159.00 $6 163 3 day schedule, 4 hour program $611.00 per month NA NA $636.00 $25 164 2 day schedule, 4 hour program $407.00 per month NA NA $424.00 $17 165 1 day schedule, 4 hour program $204.00 per month NA NA $212.00 $8 166 Other Fees
167 Before/After School & Preschool Programs - Non-Refundable Registration Fee $86.00 per registration $104.40 14% $90.00 $4 168 Before/After School & Preschool Programs - Drop-In fee, under 3 hours program $26.00 per day/per program NA NA $28.00 $2 169 Before/After School & Preschool Programs - Drop-In fee, over 3 hours program $50.00 per day/per program NA NA $52.00 $2 170 Before/After School Program - Receives Reduced Lunch 30% discount NA NA 30% $0 171 Before/After School Program - Receives Free Lunch 50% discount NA NA 50% $0 172 Preschools - Non-Resident Rate 20% surcharge NA NA 20% $0 173 Preschools - Qualifies for City Scholarship - Residents 25% discount NA NA 25% $0 174 Preschools - Qualifies for City Scholarship - Non Resident Regular Resident Rate
discount NA NA Regular Resident Rate $0
175 Fees can be adjusted proportionally due to substantial changes in program hours at the discretion of the Recreation Director program hours 176 Fees can be adjusted proportionate to any mandated staff to child ratio changes at the discretion of the Recreation Director staffing/ enhanced
requirements
177 Preschools - Over 8 hours (full day) 10% monthly discount NA NA 10% $0 178 Before/After School & Preschool Fees Include 3.5% Admin Surcharge listed in "Other Fees & Discounts" Section
179 Adult Programs and Services
180 Respite Group—Resident $32.00 per day NA NA $34.00 $2 181 Easy Ride Paratransit, each way $2.00 per trip NA NA $2.00 $0 182
City Run Day Trips Resident (Prices based on mileage, length of trip, admission rates, volunteer trip leader expenses and supplies needed, staff planning time)
$15-$260 see brochure for actual costs NA NA $15-$270 Varies 183 Other Fees & Discounts
Agenda Packet Page 190 of 293

RECREATION
Item
No. Title Current Fee/Charge Unit Notes Full Cost Subsidy % Proposed Fee Fee Δ 184 Miscellaneous
185 Transfers, Cancellations (non-camp), and Late Payments (25% of fee, up to maximum and rounded to nearest dollar) $25.00 maximum charge per session NA NA $26.00 $1
186 Late Pick-Up Fee ($20 minimum + $1.00 per minute) $20.00 minimum late pick-up fee NA NA $20.00 $0 187 Misc. Product Fee (depending on level of effort) Cost + 5%-20% each + surcharge NA NA Cost + 5%-20% $0 188 Staff Total Cost (i.e. custodian, part time recreation leader, etc.) Full Hourly Cost per hour NA NA Full Hourly Cost $0 189 Signage/Banner on Recreational Facilities (per policy) $0-$78 per banner or sign/month NA NA $0-$78 $0 190 Long Term Rental Discount - as determined by Recreation Director 191 Administrative Surcharge Fee for City Run Programs 3.5% per transaction NA NA 3.5% $0 192 Non-Resident & Commercial Facility Rentals Fee Surcharge - rounded to nearest dollar (unless otherwise noted) 25% additional amount NA NA 25% $0 193 Special Promotion/Marketing Fundraising Opportunities - as determined by Recreation Director
194 New Classes, Events, Field Trips, Leagues, Programs, Products, Uniforms, etc. as approved by Recreation Director
195 City Run Program (Price based on number of days and hours, cost of supplies, staff, and staff planning time) $0-$229 per day/per program NA NA $0-$229 $0 196 Third Party Programs
197
The fees for all third party provided activities may vary based on contract negotiations & market rates at discretion of the Recreation Director
198 No Non-Resident Surcharges for El Cerrito School Based Enrichment Programs
199 Surcharge on Fee-Based Programs by Independent Contractor 3.5% percent of fee NA NA 3.5% $0 200
Optional Disabled and Senior Discount (independent contractors may choose to use discount and split discount with City) - for ages 60+, disabled patrons. Does not apply to fees in "Adult Programs and Services" section.
15% percent of fee NA NA 15% $0
201 Recreation Brochure Advertisements
202 Copy Ready, 1/8 page $208.00 each NA NA $217.00 $9
203 Copy Ready, Quarter page $468.00 each NA NA $487.00 $19 204 Copy Ready, Half page $780.00 each NA NA $812.00 $32 205 Copy Ready, Full page $1,300.00 each NA NA $1,352.00 $52 206 Full Year of Advertising (3 RECguide Issues) 15% Discount NA NA 15% $0 207 Graphic Preparation-Graphic Designer Actual Cost Actual NA NA Actual Cost $0 Agenda Packet Page 191 of 293
General Plan Update Cost $26,213 Total in
Update Interval (Years) 1 Cost Detail Today's $
Safety Element 167,517
Yearly Cost Need $26,213 Ongoing General Plan Maintenance 7,837 Annual Housing Element Maintenance 10,000
Total Building Permit Revenue 1,091,967
Full Cost General Plan Fee 2.4%
Total
Current Fee New
Input fee desired 2.4% Ongoing General Plan Maintenance Position Hours
New Cost Recovery level 100% CD - Associate Planner 12
CD - Senior Planner 4
CD - Planning Manager 4
General Plan Update Fee
Fee attached as a percentage of Building Permit and
Planning Applications
Agenda Packet Page 192 of 293
User Fee Study
City of El Cerrito
Agenda Item No. 8.B.

Attachment 4
Agenda Packet Page 193 of 293
2 What are User Fees
 Provide private benefit with limited or no
community benefit
 State law requires that 1) individual use of
the service must be voluntary, and 2) fees
must reasonably relate to the services
provided
 Fee levels & cost recovery determined
through City Council fee adoption
 Does not include development impact fees,
utility rates, taxes, etc.

Agenda Packet Page 194 of 293
3 Why Update User Fees
 Subsidies in services impact the General Fund
o Private & specific benefit services are subsidized by unobligated funding sources
o Reduces ability to fund general & community
benefits
 Decreased department funding typically results in
understaffing and reduces service quality
 Cost recovery knowledge and planning
o Provides clarity pressures on City resources
o Enables City to strategize and set fees to benefit of the City and community
o State requirements for reasonable cost-based fees
Agenda Packet Page 195 of 293
4 User Fee Objectives & Steps
 Determine full cost of providing services or programs o Review fee schedules based on service delivery
o Identify potential new fees (not currently collected) o Reduce or remove fees
o Using fully-burdened rates, calculate full cost recovery  Update fees for services based on cost analysis
o Incorporate or establish cost recovery goals
 Subsidies allow access to services and facilitate compliance o Identify appropriate fee levels that:
 Enhance reasonability and applicability
 Maintain consistency with local policies and objectives  Maintain legal compliance with state law
Agenda Packet Page 196 of 293
5 Scope of the Study
 Review and calculate cost of providing services
and related fees charged by the following
departments and divisions:
o Citywide Services
o Business License
o Planning
o Building
o Public Works
o Fire
o Police
o Recreation
Agenda Packet Page 197 of 293
6 Data & City Staff Participation
 Primary types of data used:
o Expenditure data
o Staffing structures
o Central service/Indirect overhead
o Productive/billable hours
o Time estimates to complete tasks
o City/Department input, feedback and policies
 Staff support throughout process essential to ensure analysis fidelity
Agenda Packet Page 198 of 293
7 Summary Steps of the Study
Model
Development
Data
collection
Build fee
model
Overhead
and FBHR
Calculation
Cost Analysis
Staff
meetings
Update fee
schedules
Staffing and
time data
Full cost for
services
Set Cost
Recovery
Current cost
recovery
Target cost
recovery
Fee Study
Report
Create draft
report
Staff report
review
Finalize
report
Updated Fee
Adoption
Public
Hearing
Agenda Packet Page 199 of 293
8 Cost of Service Calculation
 Primary types of data used:
o Salary & Benefits
o Services and supply costs
o Indirect support costs
o System and maintenance costs
 Hourly rates structured to account for direct work hours Salary &
Benefits
Productive
Hours
Salary &
Benefit
Rate
Direct and
Indirect
Overhead
Fully
Burdened
Hourly
Rate
Agenda Packet Page 200 of 293
9 Fee Cost Composition
 Fully Burdened Hourly rates
predominately used to calculate
full cost for fees
 Important to keep in mind all
processes, personnel, cross
department, and indirect
support involved to calculate
full cost for services
Fee or
Service
Permit
Reviewer
Inspector
City
Engineer
City Clerk
Clerical Staff
Department
Director
Agenda Packet Page 201 of 293
10 Citywide Services
 Services included are printing, preproduction, documents, subpoena, notary, finance charges, parking permits,
tobacco retailer license program fees, code enforcement fees
 Time based cost analysis
 Suggested fee notes:
o An increase to 11 fees
o 1 fee would decrease
o 7 new fees will be added
o 12 would remain as currently set
o Average change would be an increase of 38%
Agenda Packet Page 202 of 293
11 Business License
 Time based cost analysis
 Analysis found current fees are currently
below the full cost of providing services
 Suggested fee notes:
o An increase to 2 fees
o 2 new fees would be added
o 1 fee would remain as currently set
o Average change would be an increase of 11%
Agenda Packet Page 203 of 293
12 Planning
 Time based cost analysis
 Analysis found that most of the current fees are
underfunding the cost of most of the services
 Suggested fee notes:
o An increase to70 fees
o 17 fees would decrease
o 15 fees would remain as currently set
o 1 new fee will be added
o Average change would be an increase of 16%
Agenda Packet Page 204 of 293
13 Building
 Time based cost analysis
 Analysis found that services are currently set above and below the full cost of providing them
 Suggested fee notes:
o An increase to 120 fees
o 81 fees would decrease
o 40 fees would remain as currently set
o Average change would be a decrease of 1% for flat fees  Program analysis for Building Permits
o Analysis determined current cost recovery is at 97%
o Recommendation is to set program at full cost recovery Agenda Packet Page 205 of 293
14 Public Works
 Time based cost analysis
 Analysis found that fees are currently set below
the full cost of providing service.
 Suggested fee notes:
o An increase to 75 fees
o 15 fees would decrease
o 1 new fee would be added
o 8 fees would remain as currently set
o Average change would be an increase of 51%
Agenda Packet Page 206 of 293
15 Fire
 Time based cost analysis
 Analysis found that current fees are not completely in line with the full cost of providing service
 Suggested fee notes:
o An increase to 61 fees
o 12 fees would decrease
o 14 fees would remain as currently set
o 1 new fee will be added
o Average change would be an increase of 35%
Agenda Packet Page 207 of 293
16 Police
 Time based cost analysis
 Analysis found that most current fees are
below the full cost of providing services
 Suggested fee notes:
o An increase to 49 fees
o 20 fees would decrease
o 10 fees would remain as currently set
o Average change would be an increase of 15%
Agenda Packet Page 208 of 293
17 Recreation
 Most fees are use of government property and should be set based on policy, usage, & market factors
 Currently operating at around 51% cost recovery
 For time based fees analysis found that the current fees are below full cost
 Suggested fee notes:
o An increase to 105 fees
o 4 fees would decrease
o 2 new fees would be added
o Remaining fees would remain as currently set
o Average fee change would be an increase of 3%
Agenda Packet Page 209 of 293
18 Policy Considerations
 General standard: individuals or groups who receive
private benefit from service should pay 100% of cost
 In certain situations, subsidization is an effective
public policy tool:
oEncourage participation, and provide access to services oPromote compliance when cost is prohibitive to residents  Recommend that City utilize inflation factor to
annually adjust fees based on CPI, MOU, or another
factor
 Comprehensive analysis every 5 years
Agenda Packet Page 210 of 293
Questions
Agenda Packet Page 211 of 293
Willdan Financial Services (“Willdan”) is registered as a "municipal advisor" pursuant to Section 15B of the Securities Exchange Act and rules and regulations adopted by the United States Securities and Exchange Commission ("SEC") and the Municipal Securities Rulemaking Board ("MSRB"). The MSRB has made available on its website (www.msrb.org) a municipal advisory client brochure that describes the protections that may be provided by MSRB rules and how to file a complaint with the appropriate regulatory authority.

As part of its SEC registration Willdan is required to disclose to the SEC information regarding criminal actions, regulatory actions, investigations, terminations, judgments, liens, civil judicial actions, customer complaints, arbitrations and civil litigation involving Willdan. Pursuant to MSRB Rule G-42, Willdan is required to disclose any legal or disciplinary event that is material to Client's evaluation of Willdan or the integrity of its management or advisory personnel. Willdan has determined that no such event exists.

Copies of Willdan’s filings with the United States Securities and Exchange Commission can currently be found by accessing the SEC's EDGAR system Company Search Page which is currently available at: https://www.sec.gov/edgar/searchedgar/companysearch.html and searching for either Willdan Financial Services or for our CIK number which is 0001782739.

For the avoidance of doubt and without limiting the foregoing, in connection with any revenue projections, cash-flow analyses, feasibility studies and/or other analyses Willdan may provide the municipality with respect to financial, economic or other matters relating to a prospective, new or existing issuance of municipal securities of the municipality, (A) any such projections, studies and analyses shall be based upon assumptions, opinions or views (including, without limitation, any assumptions related to revenue growth) established by the municipality, in conjunction with such of its municipal, financial, legal and other advisers as it deems appropriate; and (B) under no circumstances shall Willdan be asked to provide, nor shall it provide, any advice or recommendations or subjective assumptions, opinions or views with respect to the actual or proposed structure, terms, timing, pricing or other similar matters with respect to any municipal financial products or municipal securities issuances, unless formally engaged to provide such information.
20 Disclosure
Agenda Packet Page 212 of 293

AGENDA BILL
Agenda Item No. 9.A.

Date: May 20, 2025
To: El Cerrito City Council
From: Karen Pinkos, City Manager; Crystal Reams, Finance Director/City Treasurer, Finance Department
Subject: Consideration of Fiscal Year 2024-25 One-Time Uses of General Fund Balance

ACTION PROPOSED
Consideration and direction on potential one-time expenditures from General Fund balance in Fiscal Year 2024-25.

BACKGROUND
The City ended Fiscal Year (FY) 2023-24 with a General Fund balance of $22.89 million. This total includes:
• $9,000,000 in the Emergency Disaster Relief Fund (EDRF) (internally restricted) • $1,372,890 in the Section 115 Trust (restricted)
• $126,751 in prepaid/inventory (non-spendable)
During FY 2024-25, the City Council has approved a total use of fund balance of $1.09 million. The projected ending General Fund balance total is $21.8 million, representing a 40% fund balance ratio. Per the Comprehensive Financial Policy, the City's General Fund reserve ratio requirement totals 30%: a minimum 17% of unassigned fund balance ($9.14 million), with the EDRF minimum reserve requirement at 13% ($6.99 million).

Currently, the EDRF is overfunded by $2.01 million.

The projected General Fund balance is shown in the table below:

Agenda Packet Page 213 of 293
Agenda Item No. 9.A.

For FY 2025-26, the General Fund expenditure budget is proposed to total $53.76 million. Per the Policy, similar to the previous fiscal year numbers, this would mean the following minimum requirements for the General Fund reserve balance:
• General Fund (17%): $9.14 million
• EDRF (13%) $6.99 million
• Total reserve minimum requirement: $16.13 million
With a projected General Fund balance that exceeds the minimum requirements, staff has identified a discretionary total of $2.1 million. On April 15, 2025, the City Council held a study session to discuss the potential use of the discretionary fund balance to address one-time expenditure needs including vehicles, equipment and time-sensitive projects. The City Council reviewed the various proposed expenditures and discussed priorities, and directed staff to return with options using $1,000,000 of the discretionary total.

ANALYSIS
Based on the City Council's discussion on April 15, City staff have reviewed and prioritized the most urgent needs for the City Council's review: the Swim Center Pool Replaster, the Fire Engine and Equipment Replacement, the Service Delivery Study, and the Section 115 Trust, as described below.
• Swim Center Pool Replaster
In February of this year, staff observed that some cracks in the pool plaster that were being monitored in the shallow section of the Emery G. Weed, III Lap Pool (Lap Pool) had expanded into a “bubble” of significant size. A bubble forms in pool plaster when water gets in between the plaster and concrete shell through cracks causing the surface to lift or bulge, creating a visible bubble that continues to expand. Eventually a portion of the bubble burst leaving large pieces of plaster completely separated from the concrete shell below. Because this represents a safety hazard and additional pressure on this area would cause the damage to expand faster, this area has been closed off to swimmers.

To assess the damage and plan for repairs, staff engaged the aquatic design and engineering firm RSM (who designed the Activity Pool Project in 2023) to provide a cost estimate, project scope and construction timeline. Their report identified additional issues including significant signs of deterioration in the pool deck such as cracks in the cement and rust that will need to be addressed soon as well. It was also determined that including the water slide installation in this project would result in significant savings versus doing these projects separately. The full scope of this project will further require full ADA and egress compliance according to the California Building Code. RSM also identified the opportunity to convert the existing cantilever gutters in the shallow end of the Lap Pool into deck level gutters, which provides important safety benefits in addition to making this portion of the Lap Pool more family-friendly. Cost estimates for the full scope described above, and detailed below, are approximately $3.4 million.

Agenda Packet Page 214 of 293
Agenda Item No. 9.A.

Item Price
Lap Pool Demolition $111,750
Lap Pool Repair (plaster & tile) $569,000
Deck Replacement $253,872
Required Equipment Upgrades $1,500
Optional Equipment Upgrades $112,400 (not included in
total below)
Waterslide* $50,000
ADA & Egress Upgrades $877,800
Contractor Costs $526,037
Soft Costs $611,391
Total: $3,001,350
Total w/ 15% Contingency
$3,451,053
*placeholder; waiting for confirmation from architect on estimated cost If the project is phased and only a replaster of the Lap Pool is completed in the first phase, the project cost would be approximately $400,000. In this scenario, the balance of the work in next phase can likely only be delayed 1 to 2 years to remain in compliance with the Contra Costa Health Department operating permit requirements due to the scale of the identified issues. It is also worth noting that the Lap Pool plaster, installed in 2003, has exceeded the typical 15–20 year lifecycle. Staff are looking into funding options for the full total for the City Council to consider at a future meeting. This may include using additional fund balance and/or borrowing and finance options.
• Fire Engine and Equipment Replacement
Type 1 Fire engine
The City's Type 1 fire engine, housed at Station 52, is beyond its expected useful life of 15 years. The purchase of a new fire engine typically happens in three phases: 1) the ordering and quote, 2) the arrival of the cab and chassis, and 3) the completion of the engine including equipment. The City currently has an estimate from our vendor, Hi-Tech Fire Equipment, for $1,428,245 plus roughly $200,000 for equipment for a total of $1,628,245. If the City completes Phase 1 and orders an Engine in 2025, Phase 2 should be complete in 2026, when the cab and chassis arrive. At this time, the City will owe roughly 50% of the total cost of the engine, or approximately $800,000. Hi-Tech estimates they can complete Phase 3 of the engine build in 2027, at which time the City will owe the remaining balance. In summary, if the City orders a fire engine in 2025, the engine should be completed in 2027 with two payments of approximately $800,000 in 2026 and 2027. All prices can fluctuate with tariff adjustments.

Self Contained Breathing Apparatus (SCBA)
The Fire Department's SCBAs were purchased in 2013 and have a mandated maximum life span of 15 years, which means they must be replaced by 2028. The City's latest estimate for replacement was $400,000. The SCBAs should be ordered in 2027 to ensure delivery and implementation by the end of 2028. The purchase amount is due at the time of delivery. All prices can fluctuate with tariff adjustments.

Agenda Packet Page 215 of 293
Agenda Item No. 9.A.

Staff are actively seeking grants to fund these items as well as other safety equipment and projects. Any funding allocated to these items would be set aside in the Vehicle and Equipment Replacement Fund, an internal service fund (ISF) to save for such purchases and/or provide matching funds in the event of a grant award.
• Service Delivery Study
The Service Delivery Study is intended to be an investment in professional services that will provide the City Council and staff with options for long-term operational savings. It is one of the projects, along with the Classification and Compensation Study and the Cost Allocation and Fee Study, that were identified as part of the Fiscal Recovery and Sustainability Plan that has guided the City to financial stability, and was submitted to the State Auditor prior to the City being removed from the high-risk program. The Study will review operations and service levels, conduct an organizational assessment, and develop recommendations for improvement in service delivery and cost savings and sustainability. This will allow the City Council and staff to address structural deficits and continue to right-size the budget, which is especially important in this volatile economy. City staff conducted a Request for Proposals for qualified firms and are in the process of identifying the firm that will perform the Study, and once a contract is negotiated will be brought to the City Council for approval. The estimated cost is $120,000 and the timeline for the Study would be approximately 6-8 months. • Section 115 Trust
The Section 115 Trust may be used for annual Unfunded Accrued Liability (UAL) costs as well as Normal Pension Costs. As shown in the presentation to the City Council on May 20, 2025 by NHA Advisors, the Trust holds $1.4M of assets as of March 31, 2025. The Trust allows for more aggressive investment strategies to allow for greater investment returns. As costs continue to rise, it is a desire of the City to continue to take action on cost management strategies for pension costs.

CalPERS projections include substantial increases to our UAL pension contribution payments starting FY 2028 through FY 2036; the Section 115 Trust could be used to smooth out the pension costs. NHA Advisors has provided the City Council with examples in their presentation on scenarios for cost smoothing that would allow the City to better project annual payments using funds from the Trust. While the Council has taken steps to fund the Trust over the past two years from General Fund balance and/or surplus funds, NHA has shown that a higher contribution would net higher investment returns for the Trust and provide a better smoothing level.

SCENARIOS AND OPTIONS
Staff is providing three options for the City Council to consider for use of one-time funds from the General Fund balance for investment in the proposed projects. These key investments would start to address the City's most urgent needs at this time. Scenario 1 provides a proposed $1 million investment and Scenario 2 provides a proposed $1.5 million investment, using a portion of the $2.1 million discretionary General Fund balance, for the City Council's consideration. None of these scenarios or options would Agenda Packet Page 216 of 293
Agenda Item No. 9.A.
reduce the General Fund reserve below the 30% threshold (17% for unassigned General Fund and 13% for EDRF). It is important to note that while these are staff's proposed recommendations, the funding amounts in any category and for any purpose are ultimately at the discretion and direction of the City Council, and the City Council may choose (or not) to allocate any amount they wish.

Scenario 1: $1 million
This scenario proposes the Pool Replaster be allocated $500,000. Along with approximately $400,000 in Measure H funds, this provides close to $1 million to start the project including design and the replastering at a minimum. The Fire Engine/Equipment replacement would be funded at $180,000, which would provide a minimal contribution; however this item would still require additional funding next fiscal year to meet the down payment. This scenario proposes $120,000 for the Service Delivery Study and a contribution of $200,000 to the Section 115 Trust.

Scenario 2: $1.5 million
Staff is offering a second option with an additional allocation of $500,000 to total a $1.5 million investment. This scenario would keep the Pool Replaster contribution at $500,000 and Service Delivery Study at $120,000. However, additional funding of $400,000 would be allocated to the Fire Engine/Equipment Replacement to ensure a higher level of contribution to the Vehicle and Equipment Replacement fund that would go toward the down payment of the engine. An additional $100,000 would be allocated to the Section 115 Trust for a total of $300,000 which would match the previous Fiscal Year contribution to the Trust.

The third scenario for consideration would be a blend of allocating funds from the General Fund balance for projects and a transfer some of the overfunded portion of the EDRF to be used for a contribution to the Section 115 Trust. As previously noted, the EDRF is overfunded by $2.01 million per the Comprehensive Financial Policy minimum requirement of 13% of General Fund expenditures, which is currently $6.99 million. If Agenda Packet Page 217 of 293
Agenda Item No. 9.A.
the City Council chose to reduce the EDRF by $1 million to contribute to the Section 115 Trust, this would allow the request of $1.5 million in one-time appropriations from the General Fund discretionary fund balance to go toward additional funding for the Pool Replaster and Fire Engine/Equipment Replacement projects. This option would leave the EDRF at $8 million, which is still overfunded per the Policy. If the City Council elected to use this scenario, in effect the allocation would be $2.5 million in total, as shown below.

Scenario 3: $1.5 million and $1 million EDRF Transfer
As noted, all proposed scenarios are projected to maintain, and exceed, the minimum reserve requirements totaling 30% of General Fund expenditures (17% for unassigned fund balance and 13% for EDRF). The following tables below show an updated General Fund projected fund balance using both Scenarios 2 and 3, should the City Council decide to move forward with either option.

Projected General Fund Balance - Scenario 2
Agenda Packet Page 218 of 293
Agenda Item No. 9.A.

Projected General Fund Balance - Scenario 3

NEXT STEPS
Staff requests that the City Council consider these scenarios, and provide direction by motion as to how to allocate any use of General Fund balance. Again, the amount of the allocations (if any) are at the discretion of the City Council. If Council provides direction by motion, staff will make any updates based on City Council feedback and will return with a resolution at the June meeting to take action to appropriate the funds. Going forward in the budget process, staff will provide City Council and FAB the Proposed FY 2025-26 Budget/Spending Authority by May 22, 2025 and expect that the FAB will review the FY 2025-26 budget at their May meeting. Final adoption of the budget and spending authority for FY 2025-26 must be completed by June 30, 2025.

STRATEGIC PLAN CONSIDERATIONS
This action supports the City's Strategic Plan Goal(s) of:
• High Performing Organization Ensure the City maintains a strong financial position and a high-performing organization where employees feel a sense of inclusion and belonging.
• Community Safety Maintain public safety responsiveness and ensure community emergency preparedness.
• Livability and Belonging Promote a high quality of life and sense of community for current and future generations.
• Infrastructure and Amenities Advance climate focused, sustaniable infrastructure efforts that have community benefit.

ENVIRONMENTAL CONSIDERATIONS
This section is not applicable to this agenda item.

FINANCIAL CONSIDERATIONS
Agenda Packet Page 219 of 293
Agenda Item No. 9.A.

All options presented would maintain current minimum reserve requirements for the General Fund and the EDRF. Scenario 1 would reduce the General Fund discretionary balance from $2.13 million to $1.13 million. Scenario 2 would reduce the General Fund discretionary balance from $2.13 million to $.63 million. Scenario 3 would reduce the General Fund discretionary balance from $2.13 million to $.63 million and reduce the EDRF from $9 million to $8 million.

LEGAL CONSIDERATIONS
This section is not applicable to this agenda item.

Reviewed by:

Attachments:

1. Presentation
Agenda Packet Page 220 of 293
May 20, 2025
Consideration of Fiscal Year 2024-25
One-Time Uses of General Fund Balance
Agenda Packet Page 221 of 293
Budget Process –
FY 2025-26
2 • Feb 4: FY 2023-24 Audit presented to City
Council
• March 4: Mid-year update to City Council on
Fiscal Year (FY) 2024-25
• April 15: City Council study session on
General Fund for FY 2025-26
• May 20: City Council discussion and
direction on one-time appropriations
• Mid-Cycle update and formal adoption of
FY 2025-26 Budget in June 2025
Agenda Packet Page 222 of 293
General Fund Balance
• 3rd Quarter General Fund
Budget Update (5/6/25)
 Projected Ending Fund Balance of
$21.8M (40% reserve ratio)
 Projected discretionary funds for
FY 2025-26 of $2.1M
• Assuming 17% reserve goal, EDRF,
and Section 115 Trust
3 Agenda Packet Page 223 of 293
One-Time Expenditures for Consideration
• Not able to be included in
FY 2025-26 operating
budget
• Requires use of
Unassigned General Fund
Balance
Recommendation:
• Allocate funds to Swim
Center and Fire
Engine/Equipment
• Allocate to
Section 115 Trust
• Appropriate funds for
Service Delivery Study
4 Description Amount
Swim Center Pool Replaster w/ ADA $3,400,000
Fire Engine 152 Replacement 1,600,000
Fire Mandated SCBA Replacement 400,000
Service Delivery Study 120,000
Office/Admin Building demolition at 10936 SPA
(former Church site) 50,000
HNA & Parks - High Priority/Hazard Tree & Vegetation
Management Work 80,000
Public Works Utility Truck/Van Purchase 60,000
Council Chambers AV Overhaul 350,000
Total $6,060,000
Agenda Packet Page 224 of 293
El Cerrito Swim Center – Lap Pool
• Full Scope: Lap Pool Replaster &
Deck Replacement, Path of Travel
ADA Compliance and Egress work
• Approximate Full Project Cost:
~$3.4 million
 Replaster Only: up to $400,000
• Construction Timeline: up to
5 months
• Possible Revenue Loss: $20,000 to
$40,000 per month (off season)
5 Agenda Packet Page 225 of 293
Fire Engine and SCBA Equipment Replacement
• Fire Engine Replacement quoted at
$1.6 Million
• Self Contained Breathing Apparatus
(SCBA) quoted at $400K
 Replacement due in 2028
• Engines will take at least two years
from order to delivery
 Can order with down payment of $800K
• Funds would be deposited in Vehicle
and Equipment Replacement Fund for
future purchase and/or provide
matching funds in the event of a grant
6 Agenda Packet Page 226 of 293
Service Delivery Study
• Investment in professional services
to provide City Council with options
for long-term operational savings
• Review of operations and service
levels, conduct organizational
assessment, and develop
recommendations for improvement
in service delivery and cost savings
and sustainability
• Timeline: 6-8 months
7 Agenda Packet Page 227 of 293
Section 115 Trust
• $1.4M of assets as of March 31, 2025
• Annual UAL Costs and Normal Pension Costs can be
supplemented with the Trust
• Cost smoothing scenario depends upon amount of
contribution*
 Higher contribution = higher returns and smoothing level • Funding scenarios:
 Surplus per Comprehensive Financial Policy
 Use of fund balance
 Consider transfer of funds from the overfunded portion of the EDRF into the Trust
• Currently overfunded by $2.01 million
• Smoothing Example #1 (right) shows investment of $1.5 million over three years
8 *Source: NHA Advisor Presentation,
Smoothing Example #1
May 20, 2025
Agenda Packet Page 228 of 293
Scenario #1 - $1M in One-Time Appropriations
9 $1 Million Investment
Swim Center Pool Replaster $500,000
Fire Engine and Equipment Replacement 180,000
Section 115 Trust 200,000
Service Delivery Study 120,000
Total General Fund Appropriation $1,000,000
Agenda Packet Page 229 of 293
Scenario #2 - $1.5M in One-Time Appropriations
10 $1.5 Million Investment
Swim Center Pool Replaster $500,000
Fire Engine and Equipment Replacement 580,000
Section 115 Trust 300,000
Service Delivery Study 120,000
Total General Fund Appropriation $1,500,000
Agenda Packet Page 230 of 293
Scenario #3 - $2.5M in One-Time Appropriations
Including EDRF Transfer
11 $1.5 million in One-time Appropriations & $1 million EDRF Transfer General Fund Appropriations
Swim Center Pool Replaster $780,000
Fire Engine and Equipment Replacement 600,000
Service Delivery Study 120,000
Total General Fund Appropriation $1,500,000
Transfer from the EDRF
Section 115 Trust (Reduction in EDRF) 1,000,000
Total General Fund Appropriation & EDRF Transfer $2,500,000 Agenda Packet Page 231 of 293
Key Highlights
12 • $2.1 million projected discretionary funds available for FY 2025-26 after meeting minimum General Fund
reserve requirements
• Prioritized investments: Swim Center,
Fire Engine/Equipment, Service Delivery Study, Section
115 Trust
• Scenarios 1 and 2 propose one-time appropriations of
$1 - $1.5 million to make key investments and to
address most urgent needs
• Scenario 3 proposes $1.5 million in one- time appropriations and a $1 million transfer from EDRF to Section 115 Trust
• All Scenarios are projected to maintain (and exceed)
minimum reserve requirements totaling 30% of
General Fund expenditures (minimum is 17% for
unassigned fund balance and 13% for EDRF)
Agenda Packet Page 232 of 293
General Fund Forecast – Scenario 2
13 Fund Balance Projection - $1.5 Million in One-Time Appropriations Amended Proposed Forecast Forecast Forecast
Actuals Actuals Budget Budget Updated Updated Updated
FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FY 2026-27 FY 2027-28 FY 2028-29 Beginning Unassigned Fund Balance $16,624,174 $23,143,081 $12,520,448 $9,927,028 $9,942,803 $9,321,243 $8,863,407 + Net Change in Fund Balance 6,518,907 (249,743) (1,093,420) 15,775 (621,560) (457,836) (26,805) - One-Time Use of Fund Balance - - (1,500,000) - - - -
- Emergency and Disaster Recovery Fund - (9,000,000) - - - - - - Section 115 Trust (1,372,890) - - - - -
Ending Unassigned Fund Balance 23,143,081 12,520,448 9,927,028 9,942,803 9,321,243 8,863,407 8,836,602 Internally Restricted EDRF - 9,000,000 9,000,000 9,000,000 9,000,000 9,000,000 9,000,000 Beginning Restricted Fund Balance - - 1,372,890 1,372,890 1,372,890 1,372,890 1,372,890 + Annual Net Revenue (Expense) - 1,372,890 - - - - -
Ending Restricted Fund Balance - 1,372,890 1,372,890 1,372,890 1,372,890 1,372,890 1,372,890 Total Fund Balance $23,143,081 $22,893,338 $20,299,918 $20,315,693 $19,694,133 $19,236,297 $19,209,492 Agenda Packet Page 233 of 293
General Fund Forecast – Scenario 3
14 Fund Balance Projection - $1.5 million in One-Time Appropriations & $1 million Transfer from EDRF to Section 115 Trust Amended Proposed Forecast Forecast Forecast
Actuals Actuals Budget Budget Updated Updated Updated
FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FY 2026-27 FY 2027-28 FY 2028-29 Beginning Unassigned Fund Balance $16,624,174 $23,143,081 $12,520,448 $9,927,028 $9,942,803 $9,321,243 $8,863,407 + Net Change in Fund Balance 6,518,907 (249,743) (1,093,420) 15,775 (621,560) (457,836) (26,805) - One-Time Use of Fund Balance - - (1,500,000) - - - -
- Emergency and Disaster Recovery Fund - (9,000,000) - - - - - - Section 115 Trust (1,372,890) - - - - -
Ending Unassigned Fund Balance 23,143,081 12,520,448 9,927,028 9,942,803 9,321,243 8,863,407 8,836,602 Internally Restricted EDRF
Beginning Balance - - 9,000,000 8,000,000 8,000,000 8,000,000 8,000,000 + One-Time Reduction - - (1,000,000) - - - -
Ending Balance - 9,000,000 8,000,000 8,000,000 8,000,000 8,000,000 8,000,000 Beginning Restricted Fund Balance - - 1,372,890 2,372,890 2,372,890 2,372,890 2,372,890 + Annual Net Revenue (Expense) - 1,372,890 1,000,000 - - - - Ending Restricted Fund Balance - 1,372,890 2,372,890 2,372,890 2,372,890 2,372,890 2,372,890 Total Fund Balance $23,143,081 $22,893,338 $20,299,918 $20,315,693 $19,694,133 $19,236,297 $19,209,492 Agenda Packet Page 234 of 293
Next Steps
• Staff will make any updates based on City Council feedback • City Council provide direction by motion on selected options  Staff will bring back Resolution with action on appropriations at June meeting
• Staff will provide City Council and FAB the Proposed
FY 2025-26 Budget/Spending Authority by May 22
• FAB review of FY 2025-26 budget at May meeting
• Final budget adoption for FY 2025-26 in June 2025
15 Agenda Packet Page 235 of 293
CITY HALL 10890 San Pablo Avenue, El Cerrito, CA 94530
Telephone (510) 215-4305 Fax (510) 215-4379 http://www.el-cerrito.org

SUPPLEMENTAL AGENDA MATERIALS

CITY COUNCIL MEETING
May 20, 2025
REGULAR CITY COUNCIL MEETING (6:00 PM)
Public Comments (Not on the Agenda and Consent Calendar) Agenda Item No. 6.A. – CalPERS Pension Costs Update
Public comments
Agenda Item No. 7.B. – Financial Advisory Board Recommendation Public comments
Agenda Item No. 7.F. – Resolution of Support for State and Federal Funding for Bay Area Public Transit
Public comments
Agenda Item No. 8.A. – Annual Public Hearing on Vacancies, Recruitment and Retention Efforts
Presentation
Agenda Item No. 9.A. – Consideration of Fiscal Year 2024-25 One-Time Uses of General Fund Balance

1. Revised Presentation

2. Public Comments
Supplemental Materials Page 1 of 58
Agenda Packet Page 236 of 293
From: Cordell Hindler
To: City Clerk
Subject: Public Comments
Date: Friday, May 16, 2025 2:39:02 PM
Caution! This message was sent from outside your organization.

Hello Mayor Wysinger, council Members and Staff
I am submitting the following comments into the record:

1. I am in full support of Item C. on the consent calendar

2. Also for a future Agenda, the council should revisit the idea of having the Public to Participate remotely

3. Also to Have Sophia Skoda to Present on Investing for the future for EBMUD Sincerely
Cordell
General Public Comments
Supplemental Materials Page 2 of 58
Agenda Packet Page 237 of 293
From: Corey Busay
To: City Clerk
Subject: Please support Richmond Street project to add bike lanes Date: Tuesday, May 20, 2025 12:15:51 PM
Caution! This message was sent from outside your organization.

Dear council,
I’m writing to voice my support for the Richmond Street Project. The proposed bike lanes will enhance safety for all road users and are vital for achieving our climate objectives.

Thank you for your consideration,
Corey Busay
Supplemental Materials Page 3 of 58
Agenda Packet Page 238 of 293
Dear Mayor Wysinger and City Council Members Quinto, Motoyama, Salzman and Ktsanes:

RE: RICHMOND STREET PROJECT
I have been a resident of El Cerrito for 31 years. I live on Everett Street, one block east of Richmond Street and two blocks west of Korematsu School.

I am very concerned about the proposal for the Richmond Street Project, or at least plans that I have heard for it. I think there are a lot of issues that will make our streets harder to navigate and have negative impacts on residents — both on and near Richmond Street.
1) PROBLEMS WITH PARKING
—The Richmond Street Project will remove half the parking for a large part of Richmond Street. This will cause spill-over parking onto nearby streets, especially Elm Street and Everett Street (where I live).
— The Richmond Street Project will mean that half the residents of the street, on the east side or west side (depending on the block) will not be able to park on the street or have as easy access their house, for example, to bring in groceries, or to assist a disabled or elderly resident.
—Due to the daylighting efforts on all the streets, not just Richmond Street, we are already losing 20 feet of parking on each side of the street at both ends. This is already a significant amount of reduced street parking.
—When Korematsu Middle School gets out, at 3 PM on weekdays, there are significant traffic and parking issues on Everett and Norvell Streets, especially around Donal Street. Of course, we want the students to be safe as they walk to BART, the bus, or their parents’ cars. However, the spill-over from the Richmond Street Project will make it more congested and dangerous on the streets leading to and from Korematsu School. 2) PROBLEMS WITH DRIVING
—Richmond Street is my main thoroughfare through town. San Pablo Avenue is too congested for several hours a day I take Richmond Street to get to El Cerrito Plaza, Christ Lutheran Senior Center, El Cerrito Natural Grocery and other frequent destinations. I think it is unwise to insert a zig-zag (“chicane”) route through town that will be confusing, especially to seniors and out-of-town people. I have driven on such routes in Berkeley. They are hard to navigate if you don’t know the neighborhood. —We have an example of extended street construction with the work on San Pablo Avenue in the past two years. This is another reason that I am dreading the Richmond Street Project. The more changes you make to the street, the longer the street will be tied up in construction and traffic blockage.
3) USE OF RICHMOND STREET FOR BICYCLES:

Why does El Cerrito need another bike route? Quite a few people ride bikes on Everett Street and currently this is still a reasonably safe route for them.

Page 1 of 2 ends
← All documents from this meeting