Cities Index.
Construction Contract (Large File)

Emeryville City Council
July 19, 2022

Document
Construction Contract (Large File)
Meeting
July 19, 2022
Body
Emeryville City Council
Pages
5
Original file
41.9 MB
Text extracted from the city's file for reading and search. Open the original on emeryville.legistar1.com. That file is the official record.

C A L I F O R N I A

C O N S T R U C T I O N C O N T R A C T

F O R C I T Y U S E O N L Y
Contract No. CIP No.

Resolution No. Project No.

REV 07/2022
THIS CONSTRUCTION CONTRACT (“Contract”) is effective as of _______________ (the “Effective Date”), by and between THE CITY OF EMERYVILLE, a municipal corporation, (“City”) and CF CONSULTING, INC. (“Contractor”), individually referred to as a “Party” and collectively as the “Parties”.

W I T N E S S E T H T H A T
WHEREAS, by Resolution No. __________, the City Council of the City of Emeryville has authorized the Director of Public Works to solicit public bids for the Annual Street Rehabilitation And Preventive Maintenance Project Fiscal Year 2021/2022, Project No. EPW 21-102, CIP No. 17240005 (the “Project”); and
WHEREAS, the City has conducted a public bidding procedure in compliance with all applicable laws; and
WHEREAS, Contractor submitted the lowest responsible bid; and WHEREAS, the City has determined that the Contractor is qualified by training and experience to render such services; and
NOW, THEREFORE, the Parties hereto do mutually agree as follows:

1. CONTRACT DOCUMENTS
The following documents, including their respective exhibits and addenda (collectively "Contract Documents"), are by this reference incorporated in and made a part of this Contract in the following order of precedence:

A. Amendments to this Contract
B. Contract
C. Addenda to Invitation for Bid
D. Supplemental Specifications
E. Instructions to Bidders
F. City of Emeryville Standard Specifications
1) http://www.ci.emeryville.ca.us/132/City-Standards
2) http://www.ci.emeryville.ca.us/348/City-Standard-Specifications DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 City of Emeryville | Construction Contract
REV 07/2022

Page 2 of 5 ends

G. State of California Department of Transportation Standard Plans http://dot.ca.gov/programs/design/ccs-standard-plans-and-standardspecifications H. State of California Department of Transportation Standard Specifications http://dot.ca.gov/programs/design/ccs-standard-plans-and-standardspecifications I. Project Plans, Specifications, and Contract Drawings for:
the Annual Street Rehabilitation And Preventive Maintenance Project Fiscal Year 2021/2022, Project No. EPW 21-102, CIP No. 17240005 (the “Project”)
J. Required Bond Documents
K. Notice to Contractors
L. Contractor's Bid and Proposal, As Accepted by City

2. SCOPE OF WORK
In conformance with the Contract Documents, Contractor will furnish, all labor, materials, equipment, incidentals, transportation and disposal for services required in order to perform and complete the Project.

3. PRICE
The total amount to be paid under this Contract for all of the work set forth in Section 2 above is exceed ONE MILLION, SIX HUNDRED TWENTY EIGHT THOUSAND TWO HUNDRED EIGHTEEN DOLLARS AND NO CENTS ($1,628,218.00) ("Total Contract Price"). This price includes all costs for labor, materials, tools, equipment, services, warranty, taxes, insurance, overhead, profit and all other costs necessary to perform the work in accordance with this Contract.

4. TIME FOR COMPLETION
After the Contract has been executed by City, Contractor shall begin work within seven (7) calendar days after the effective date of the Notice to Proceed issued by City and shall diligently prosecute the work to completion within thirty-five (35) working days from the effective date of the Notice to Proceed. Liquidated Damages in the Amount of $3,000.00 per calendar day will be assessed for failure to complete the contract work within the number of workdays specified.

5. INDEMNIFICATION
To the fullest extent permitted by law, Contractor shall indemnify, defend, and hold harmless City and City’s members, officers, agents, employees and volunteers, from and against any and all claims, losses, liabilities of every kind, nature and description, damages, injury (including without limitation injury to or death of an employee of Contractor or subcontractors as well as any claim by any employee, agent, Contractor DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 City of Emeryville | Construction Contract
REV 07/2022

Page 3 of 5 ends

or independent contractor hired or employed by Contractor that such persons or individuals are entitled to any benefit otherwise provided to employees of the City, including coverage under the California Public Employee Retirement System), costs and expenses of any kind, whether actual, alleged or threatened, including, without limitation, incidental and consequential damages, court costs, reasonable attorneys’ fees, litigation expenses, and fees of expert contractors or expert witnesses incurred in connection therewith and the costs of investigation, arising out of, pertaining to, or relating to, directly or indirectly, in whole or in part, the negligence, recklessness, or willful misconduct of Contractor, any subcontractor, anyone directly or indirectly employed by them or anyone that they control. This indemnification obligation is not limited in any way by any limitation on the amount or type of damages or compensation payable to or for Contractor. This obligation to indemnify and defend the City, its members, officers, agents, employees and volunteers shall survive termination of this Contract. Notwithstanding the foregoing, to the extent required by Civil Code section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the City or the City’s agents, servants, or independent contractors who are directly responsible to the City, or for defects in design furnished by those persons

6. INSURANCE

6.1 General Liability
Contractor shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $2,000,000.00 per occurrence for bodily injury, personal injury, and property damage, including without limitation, blanket contractual liability and coverage for explosion, collapse and underground property damage hazards. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.

Contractor’s general liability policies shall be primary and shall not seek contribution from the City’s coverage, and be endorsed using Insurance Services Office form CG 20 10 to provide that City and its officers, officials, employees, and agents shall be additional insureds under such policies. An endorsement providing completed operations coverage for the additional insured, ISO form CG 20 37, is also required.

6.2 Auto Liability
Contractor shall provide auto liability coverage for owned, non-owned, and hired autos using ISO Business Auto Coverage form CA 00 01, or the exact equivalent, with a limit of no less than $2,000,000.00 per accident.

6.3 Workers’ Compensation
Contractor shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance with limits of at least $1,000,000.00. Contractor shall DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 City of Emeryville | Construction Contract
REV 07/2022

Page 4 of 5 ends

submit to City, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of City, its officers, agents, employees, and volunteers.

7. NO WAIVER
Failure of City to insist upon strict performance of any of the terms and conditions hereof, or failure or delay to exercise any rights or remedies or to properly notify Contractor in the event of breach, or the acceptance of or payment for any good hereunder, shall not release Contractor of any of the warranties or obligations of this Contract and shall not be deemed a waiver of any right of City to insist upon strict performance hereof.

8. NOTICES
Any notice required to be given by this Contract will be in writing and deemed effective upon personal delivery, or 1 business day after being sent via registered or certified mail return receipt requested or by overnight commercial courier providing next business day delivery and addressed to the following respective parties:

City Contractor
City of Emeryville CF Contracting, Inc.

Attn: Ryan O’Connell Attn: Jacob Friedman
1333 Park Ave 96 Forrest Avenue
Emeryville, CA 94608 Fairfax, CA 94930
510-596-4346 415-310-5442

9. Entire Contract
This Contract contains the entire agreement of the parties with respect to the subject matter of this Contract. Any modifications to this Contract shall be in writing.

10. Authority to Contract
Contractor covenants and declares that it has obtained all necessary approvals to bind Contractor to this Contract and that the representative signing the Contract is authorized to do so.

SIGNATURES ON FOLLOWING PAGE
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 City of Emeryville | Construction Contract
REV 07/2022

Page 5 of 5 ends

9. SIGNATURE PAGE TO CONSTRUCTION CONTRACT
IN WITNESS WHEREOF the City and the Contractor have executed this Contract, which shall become effective as of the date first written above.

Approved As To Form:

City Attorney
Dated: CITY OF EMERYVILLE
Christine S. Daniel, City Manager
Dated: CF CONTRACTING, INC.
(Signature)
Jacob Friedman, President
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 07/07/2022

CALIFORNIA
REV 08/2020 Page 1 of 5

EXHIBIT B
Contract Insurance Requirements
As used in this Exhibit B, Contractor refers to CF CONTRACTING, INC.

1. MINIMUM REQUIREMENTS
Contractor shall, at its expense, procure and maintain for the duration of the Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work or Services required by the Contract hereunder by Contractor, its agents, representatives, employees or subcontractors. Contractor shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Contract. Such insurance shall meet at least the following minimum levels of coverage, as checked below:

1.1 Minimum Scope of Insurance
Coverage shall be at least as broad as the latest version of the following:
 General Liability
Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01).
 Automobile Liability
Insurance Services Office Business Auto Coverage form number CA 00 01, code 1 (any auto) or if Contractor owns no vehicles, this requirement may be met through a non-owned auto endorsement to the General Liability Policy.  Professional Liability / Errors and Omissions
Written on a policy form specifically designed to protect against acts, errors or omissions of the Contractor wherein “Covered Professional Services” as designated in the policy must specifically include Services performed under this Contract.
 Workers’ Compensation and Employer’s Liability
Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. Policies shall not contain exclusions contrary to this Contract.
 Pollution Liability Insurance
Pollution Liability insurance for claims arising from the discharge, dispersal release or escape or any irritant or contaminant into or upon land, any structure, the atmosphere, watercourse or body of water, including groundwater. This shall DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 City of Emeryville | Contract Insurance Requirements (Exhibit B) REV 08/2020

Page 2 of 5 ends

include on and off-site clean up and emergency response costs and claims arising from above ground and below ground storage tanks.

1.2 Minimum Limits of Insurance
Contractor shall maintain limits no less than:
 General Liability
All Contract Types
$1,000,000.00 per occurrence and $2,000,000.00 aggregate for bodily injury, personal injury and property damage, including without limitation, blanket contractual liability.

OR
Construction Specific
$2,000,000.00 per occurrence and $4,000,000.00 aggregate for bodily injury, personal injury and property damage, including without limitation, blanket contractual liability, and coverage for explosion, collapse and underground property damage hazards.
 Automobile Liability
$2,000,000.00 per accident for bodily injury and property damage.  Professional Liability / Errors and Omissions
$2,000,000.00 per claim and aggregate.
 Workers’ Compensation and Employer’s Liability
Workers’ compensation limits as required by the Labor Code of the State of California. Employer’s Liability limits of $1,000,000.00 each accident, policy limit bodily injury or disease, and each employee bodily injury or disease.  Pollution Liability Insurance
$2,000,000.00 per occurrence and $2,000,000.00 aggregate.

Except for the professional liability / errors and omissions policy, defense costs shall be available in addition to the limits. Notwithstanding the minimum limits specified herein, any available coverage shall be provided to the Parties required to be named as additional insureds pursuant to this Contract.

2. INSURANCE ENDORSEMENTS
The insurance policies shall contain the following provisions, if checked, or Contractor shall provide endorsements (amendments) on forms supplied or approved by the City to add the following provisions, if checked, to the insurance policies:

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 City of Emeryville | Contract Insurance Requirements (Exhibit B) REV 08/2020

Page 3 of 5 ends

 General Liability
(1) Such policy shall provide the City, its officials, employees, agents and authorized volunteers additional insured status using ISO endorsements CG20 10 or CG20 37, or endorsements providing the exact same coverage, with respect to the work or operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such work; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; (3) the insurance coverage shall be primary insurance as respects the City, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self-insurance maintained by the City, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it; and (4) the insurance coverage shall contain standard separation of insureds provisions.
 Automobile Liability
(1) Such policy shall provide the City, its officials, employees, agents and authorized volunteers additional insured status with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the City, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self-insurance maintained by the City, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it in any way.
 Professional Liability Coverage
Any policy inception date, continuity date, or retroactive date must be before the effective date of this Contract and Contractor agrees to maintain continuous coverage through a period no less than three years after termination of the Contract.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 City of Emeryville | Contract Insurance Requirements (Exhibit B) REV 08/2020

Page 4 of 5 ends

 Workers’ Compensation and Employer’s Liability Coverage The insurer shall agree to waive all rights of subrogation against the City, its officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy which arise from work performed by Contractor.  Pollution Liability Coverage
(1) Such policy shall give the City, its officials, employees, agents and authorized volunteers additional insured status with respect to claims arising from the discharge, dispersal release or escape or any irritant or contaminant into or upon land, any structure, the atmosphere, watercourse or body of water, including groundwater; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the City, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self-insurance maintained by the City, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it in any way.

ALL COVERAGES
Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or canceled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its officials, employees, agents and authorized volunteers.

3. NO SPECIAL LIMITATIONS
The required insurance shall not contain any special limitations on the scope of protection afforded to the City, its officials, employees, agents and authorized volunteers.

4. DEDUCTIBLES AND SELF-INSURANCE RETENTIONS
Any deductibles or self-insured retentions must be declared to and approved by the City. Contractor shall guarantee that, at the option of the City, either: (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officials, employees, agents and authorized volunteers; or (2) the Contractor shall procure a bond or other financial guarantee acceptable to the City guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 City of Emeryville | Contract Insurance Requirements (Exhibit B) REV 08/2020

Page 5 of 5 ends

5. ACCEPTABILITY OF INSURERS
Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A-:VII, licensed to do business in California, and satisfactory to the City. Exception may be made for the State Compensation Insurance Fund when not specifically rated.

6. VERIFICATION OF COVERAGE
Contractor shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Contract on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms supplied or approved by the City. All certificates and endorsements must be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance policies, at any time.

7. SUBCONTRACTORS
All subcontractors shall meet the requirements of this Section before commencing any work. Contractor shall furnish separate certificates and endorsements for each subcontractor. Subcontractor policies of General Liability insurance shall name the City, its officials, employees, agents and authorized volunteers as additional insureds using form ISO 20 38 04 13 or endorsements providing the exact same coverage. All coverages for subcontractors shall be subject to all of the requirements stated herein except as otherwise agreed to by the City in writing.

8. REPORTING OF CLAIMS
Contractor shall report to the City, in addition to Contractor’s insurer, any and all insurance claims submitted by Contractor in connection with the work performed under this Contract.

Attach:

Insurance Certificate and Endorsements
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN THAT sealed bids will be received by the City of Emeryville, Alameda County, California, (hereinafter "City") at the Office of the Director of Public Works, 1333 Park Avenue, Emeryville, CA 94608, until 2:00 PM, June 16, 2022, at which time bids will be publicly opened for the following project:

Annual Street Rehabilitation and Preventive Maintenance Project Fiscal Year 2021/2022 Project No. EPW-21102
This project entails street rehabilitation and preventive maintenance on various streets throughout the City of Emeryville. The specific streets included in this project are:
 41st Street (San Pablo Avenue – Adeline Street)
 43rd Street (San Pablo Avenue – Adeline Street)
 45th Street (San Pablo Avenue – Adeline Street)
 47th Street (San Pablo Avenue – Adeline Street)
 48th Street (San Pablo Avenue – City Limits)
 Salem Street (43rd Street – 45th Street)
 Essex Street (43rd Street – 45th Street)
 Doyle Street (45th Street – Steve Dain Drive)
 Steve Dain Drive (Doyle Street – San Pablo Avenue)
This project generally includes, but is not limited to, the reconstruction and preservation of asphalt pavement; replacement of traffic striping and markings; installation of signs; reconstruction of PCC sidewalks, driveways, medians, curb, gutters, and curb ramps; and reconstruction of existing bulbout planters.

In regards to asphalt pavement preservation and maintenance, the project requires the contractor to use crack seal, crack repair, and slurry seal where indicated. In regards to asphalt pavement removal and replacement, the project requires various methods including the contractor to provide a full dig out, replace the existing asphalt, and construction of new pavement section where indicated.

The work, to be completed within 35 working days, is more fully described in the Contract Documents, as defined in the Contract provided in Section 8, Part A, Bid Documents. The engineer’s estimate for this project is $1,380,000. Liquidated Damages in the Amount of $1,500 per calendar day will be assessed for failure to complete the contract work within the number of workdays specified.

Bidders and their proposed subcontractors shall hold such licenses as may be required by the laws of the State of California for the performance of the work specified in the Contract Documents. Bidders bidding as the prime Contractor shall possess a valid California State Contractor’s License, Classification A – General Engineering, C12 – Earthwork and Paving, or C32 – Parking and Highway Improvement at the time of contract award and throughout the Contract term. The Contractor will also be required to ensure that all subcontractors working on the project are holding valid licenses suitable for their trade.

Bids shall be submitted on the forms included in Part A, Bid Documents, plainly endorsed with Bidder's name together with signed acknowledgment of any and all addenda. Bidder’s attention is directed to the Section 2, Part B, Bidding. Bid Documents shall be securely sealed in a suitable envelope marked with the name and address of the Bidder, and marked in capital letters on the front of the envelope, as follows:

Annual Street Rehabilitation and Preventive Maintenance Project Fiscal Year 2021/2022 Project No. EPW-21102
Whether mailed or personally delivered, all bids shall be securely sealed in a suitable envelope and addressed to the City Engineer, City of Emeryville, Alameda County, California, 1333 Park Avenue, Emeryville, CA 94608. No late bids will be accepted and will be returned unopened.

Each bid must be accompanied by a Bid Guaranty in the form of Cash, Bidder's Bond, Certified Check or Cashier’s Check in an amount equal to at least ten percent (10%) of the Total Bid Price. The Bid Guaranty will be retained and applied to any and all damages sustained by the City in the event that the successful DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 Bidder fails or refuses to enter into the Contract awarded to it or furnish all required bonds and certificates of insurance.

Plans, Specifications, Bid Documents, Supplemental Specifications and any Addendum may be obtained free of charge from the City of Emeryville website at http://emeryville.org/904/RFPs-Bids or at www.ciplist.com.

The Contract awarded pursuant to this advertisement is subject to the State contract nondiscrimination and compliance requirements pursuant to California Government Code §12990.

The City of Emeryville hereby notifies all Bidders that it will affirmatively ensure that in any Contract awarded pursuant to this advertisement, disadvantaged business enterprises (DBEs) will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. DBEs are strongly encouraged to submit bids as both prime Contractors and subcontractors.

This is a Public Works Contract. In accordance with section 1720 et seq. of the Labor Code, the general prevailing wage rates as established by the Director of the California Department of Industrial Relations will apply. The prevailing wage rates established by the State Director of Industrial Relations can be viewed at the City’s offices, are available on the State of California’s website at http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm, or can be obtained by mail addressed to:

Prevailing Wage Unit, Division of Labor Statistics and Research, Department of Industrial Relations, P.O. Box 603, San Francisco, CA 94101.

No Contractor or subcontractor may be listed on a bid proposal or awarded a contract for a public works project unless registered with Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5 at the time of bid. Each Bidder and subcontractor must submit proof of contractor registration with DIR (e.g. a hard copy of the relevant page of the DIR's database found at: https://efiling.dir.ca.gov/PWCR/Search).

This Contract is subject to monitoring and enforcement by the DIR pursuant to Labor Code Section 1771.4.

Pursuant to Public Contract Code Section 22300, the successful Bidder may submit certain securities in lieu of the City retaining a portion of progress payments during the Project. Pursuant to California Civil Code Section 9950, the successful Bidder at the time the contract is awarded shall furnish a payment bond if civil work exceeds twenty-five thousand dollars ($25,000) in the amount of 100% of the Total Contract Price. The successful Bidder shall also provide a performance bond in the amount of 100% of the Total Contract Price.

Attention is directed to the Contract Documents for complete details and bid requirements. Said Contract Documents shall be considered as a part of any Contract awarded pursuant to this Notice Inviting Bids.

All bids are to be compared on the basis of the City Engineer's estimate of the quantities of work to be done. The City of Emeryville reserves the right to reject any or all bids, and further reserves the right to waive formal irregularities as to any bid substantially in conformity with the specifications herein referred to. The City of Emeryville reserves the right to reject any and all bids or to waive any defects or irregularity in bidding in accordance with applicable law. In accordance with California Public Contract Code Section 20103.8, if the City elects to award a contract for performance of the project, the contract will be awarded in accordance with California Public Contract Code Section 20162 and other applicable law to the responsible bidder submitting a responsive bid with the lowest total bid price. All bids will remain valid for 90 days after the bid opening. Except as permitted by law and subject to all applicable remedies, including forfeiture of bidder’s security, bidders may not withdraw their bid during the 90-day period after the bid opening.

The firm of Crossroad Lab has provided engineering services to the City for this project. Therefore, this firms, and any of their affiliates, partners, officers, employees, parent companies or subsidiaries are prohibited from being awarded the Contract for the project, subcontracting for a portion of the work under the Contract for the project, or supplying materials for the work under the Contract for the project. Accordingly, these persons and entities are ineligible to bid on the project and no Contract shall be awarded to such persons or entities identified as the Contractor, subcontractor or supplier on a submitted bid proposal for this Project.

All questions prior to award of the Contract shall be directed to the Project Manager Ryan O’Connell DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 [email protected]. The deadline for submissions of initial questions and clarifications concerning the Contract Documents is June 9, 2022, at 5:00pm. Only signed Addenda issued by the City Engineer or Project Engineer are binding.

By order of the City Council of the City of Emeryville, Alameda County, California, January 18, 2022.

Date: 5/25/2022
Ryan O’Connell, PE
Senior Civil Engineer, City of Emeryville
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Addendum No. 1 Page 1 of 3

ANNUAL STREET REHABILITATION AND

PREVENTIVE MAINTENANCE PROJECT
FISCAL YEAR 2021/2022
(PROJECT NO. EPW-21102)
ADDENDUM NO. 1
June 8, 2022
To All Plan Holders:

Notice is hereby given that the following changes to the bid documents have been made for the above referenced project:

Part A – CONTRACT DOCUMENTS

1. Bid Sheet
a. The following changes are made to the Bid Sheet. New bid items have been added and the new Bid Sheet is as an attachment to this addendum.

Item No. Description Unit Quantity
53 Standard Simme-Seat (SS3)
with Divider EA 40
54 Standard Simme-Seat (SS3)
with Pole EA 10
Part C – SPECIAL PROVISIONS

1. Part C – Section 10-5.53
a. Add the following section:
i. Section 10-5.53 Simme-Seats (Bid Items No. 53 and 54) 10-5.53.1 General
Simme-Seats shall be RAL color code 6004. Installation of seats shall be at the back of sidewalk at (50) bus stop locations in the City of Emeryville. Engineer to mark out installation locations and provide location map prior to beginning of Construction.

Manufacturer recommendations to be followed for installation (https://simmeseat.com/).

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Addendum No. 1 Page 2 of 3
10-5.53.2 Payment
Payment for Simme-Seats (Bid Items No. 53 and 54) will be made at the respective contract price per each and shall include furnishing all labor, material, tools, equipment, traffic control, and incidentals necessary to provide, install as directed by Engineer in the field.

EPW-21102 - Construction Plans
The following sheets have been revised as follows for clarity:

2. Title Sheet (T-01)
a. Formatting and Addition of Engineer’s Stamp/Legend.

3. Detail Sheet Set (D-02, D-03, D-04)
a. Formatting/Scaling revisions of few details.

4. Pavement Sheet (I-01)
a. Annotation and formatting changes.

5. Layout Sheet (L-01)
a. Annotation and formatting changes.

6. Layout Sheet (L-02):
a. Annotation and formatting changes.
b. Doyle and 45th St: Striping revised and conformed to the pavement edge limits on the Westside of Doyle and 45th Intersection.

7. Layout Sheet (L-03)
a. Annotation and formatting changes.
b. 47th St: Removal of striping outside proposed pavement area.

8. Layout Sheet (L-07)
a. Annotation and formatting changes.

9. Layout Sheet (L-10)
a. Annotation and formatting changes.

10.Layout Sheet (L-11):
a. Annotation and formatting changes.
b. 41st and Adeline St: Formatting changes for Bike Sharrow marking directing Westbound on 41st before the intersection.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Addendum No. 1 Page 3 of 3
The complete EPW-21102 Construction Plan Set (28 pages) is to be replaced in its entirety as attached to this Addendum No. 1.

Quantities for bid items from the EPW-21102 plans do not need to be updated as the minor changes above are accounted for in the existing bid proposal quantities.

Signature of this Addendum Sheet and inclusion of it with the Proposal is required at the time of bid opening.

Date: June 8, 2022 by:___________________________
Ryan O’Connell, PE
Senior Civil Engineer
Company Name: ___________________ Authorized Signature:_________________ Authorized Name: ___________________ Date: ______________________ DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 Contractor:

Date:

Plan Nos.: EPW-21102
No. CONTRACT BID ITEMS Quantity Unit Unit Price Total

INCIDENTAL ITEMS
Note: All items subject to any special notes or footnotes appearing on this Engineer's estimate included with the bid documents. ….. ….. N/A N/A
Note: The Contract lump sum or unit price for each Contract Bid Item shall include full compensation for all labor, materials, tools, taxes, profit, overhead, incidentals and appurtenant work necessary for performing and completing the work of the Contract Bid Item as required by the Project Plans, Specifications, Special Provisions and other Contract Documents. Such compensation shall also include or take into consideration any additional provisions or conditions specifically stated immediately following the Contract Bid Item.
….. ….. N/A N/A
Note: In the absence of a specific bid item or specific payment provisions for any portion of the work required by the Contract Documents, the bidder shall include the bidder’s compensation for that portion of the Contract work in the Contract unit price(s) and/or lump sum price(s) of the bid item(s) that require such work, or are closely related to such work. Therefore, no separate or additional payment will be made to the Contractor for any such work on the premise that such work lacks specific bid item(s) or specific payment provisions.
….. ….. N/A N/A
Note: "(P)" adjacent to a Contract bid item designates a "Partial Pay Item" ….. ….. N/A N/A Note: "(F)" adjacent to a Contract bid item designates a Final Pay Quantity ….. ….. N/A N/A Note: "(S)" adjacent to a Contract bid item designates a "Specialty Item" ….. ….. N/A N/A 1 Supplemental Work 1 LS $150,000.00 $150,000.00
2 Mobilization 1 LS
3 Traffic Control System 1 LS
4 Water Pollution Control 1 LS
Street Rehabilitation and Preventive Maintenance
5 Install Crack Fill/Repair, (P) 5,000 LF
6 Type II Slurry Seal 380,000 SF
7 Remove and Replace Pavement Section (8" Max) - Dig Out Locations, (P) 5,000 SF 8 Raised DGAC (1” Minimum) 500 SF
9 Adjust Valves and Covers to Grade 50 EA
10 Top Soil 200 SF
11 4" Median Curb and PCC 516 SF
12 6" Median Curb and PCC 1,306 SF
13 6" Curb and Gutter 18 LF
14 PCC Curb Ramp per Caltrans Standard Plan A88A. (Type per plan, includes any modifications as necessary.) 7 EA
Traffic Improvements
15 K72 Marker Post, (S) 205 EA
16 Flexible Mount Delineator, (S) 60 EA
17 Slotted Speed Cushion, (S) 6 EA
18 Wheel Stop, (S) 20 EA
19 6" Solid Double Yellow Thermoplastic (Detail 22), (S) 4,924 LF 20 6" Solid Yellow Thermoplastic (Detail 25), (S) 276 LF 21 6" Solid White Thermoplastic (Detail 27B), (S) 646 LF 22 8" Solid White Thermoplastic Stripe (Detail 38), (S) 106 LF 23 6" Solid White Thermoplastic Stripe (Detail 39), (S) 14,200 LF 24 6" Dashed White Thermoplastic Stripe (Detail 39A), (S) 1,125 LF 25 6" Dashed Yellow Thermoplastic Stripe (Detail 41), (S) 40 LF 26 4" Solid Yellow Thermoplastic Stripe, (S) 109 LF
27 4" Solid White Thermoplastic Stripe - BUFFER, (S) 2,836 LF 28 6" Solid Yellow Thermoplastic Stripe, (S) 70 LF
29 6" Dashed Yellow Thermoplastic Stripe, (S) 576 LF
30 8" Solid White Thermoplastic Stripe - BIKE, (S) 55 LF Sub-Total: Street Rehabilitation and Preventive Maintenance Sub-Total: Incidental Items

EMERYVILLE, CALIFORNIA
Amount rounded to Nearest: $.01

BID SHEET
Project No. EPW-21102
2011/2022 STREET REHABILITATION AND PREVENTIVE MAINTENANCE PROJECT EPW-21102 Part A, Page 6 5/26/2022
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 Contractor:

Date:

Plan Nos.: EPW-21102
No. CONTRACT BID ITEMS Quantity Unit Unit Price Total

EMERYVILLE, CALIFORNIA
Amount rounded to Nearest: $.01

BID SHEET
Project No. EPW-21102
2011/2022 STREET REHABILITATION AND PREVENTIVE MAINTENANCE PROJECT 31 12" Solid Yellow Thermoplastic Stripe, (S) 185 LF
32 12" Solid White Thermoplastic Stripe - CAR, (S) 558 LF 33 Thermoplastic Pavement Markings - SOLID WHITE (AUTO LANES), (S) 2,700 SF 34 Thermoplastic Pavement Markings - SOLID YELLOW (AUTO LANES), (S) 7,448 SF 35 Thermoplastic Pavement Markings - SOLID BLUE (HANDICAP PARKING), (S) 50 SF 36 Preformed Thermoplastic - Bike Stencil - SOLID WHITE, (S) 330 SF 37 Preformed Thermoplastic - Ped Bike Shared Sticker, (S) 11 EA 38 Preformed Thermoplastic - Bike Lane Field - SOLID GREEN, (S) 2,490 SF 39 Preformed Thermoplastic - Bike Lane Field - DASHED GREEN, (S) 2,075 SF 40 Parking Tips, (S) 98 EA
41 Paint Curb (2-coats) - Red, (S) 1,565 LF
42 Paint Curb (2-coats) - Blue, (S) 25 LF
43 Paint Curb (2-coats) - Gray, (S) 164 LF
44 Paint Curb (2-coats) - Yellow, (S) 165 LF
45 Remove Existing Striping, Markings, and Markers, (S) 1 LS 46 Furnish Single-Sheet Aluminum Sign Panel (0.063" Unframed), (S) 328 SF 47 Install Sign Panel (SSBM), (S) 2 EA
48 Install Sign Panel (Existing Post), (S) 25 EA
49 Install Sign Panel (New Post), (S) 28 EA
50 Remove Existing Post, (S) 3 EA
51 Remove Sign Panel, (S) 15 EA
52 Relocate Sign to New Pole, (S) 4 EA
53 Standard Simme-Seat (SS3) with Divider, (S) 40 EA
54 Standard Simme-Seat (SS3) with Pole, (S) 10 EA
Bidder
Authorized Signature / Title
Sub-Total: Traffic Improvements

TOTAL FOR ALL BID ITEMS
EPW-21102 Part A, Page 7 5/26/2022
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 66TH ST
67TH ST
65TH ST
59TH ST

POWELL ST
53RD ST
45TH ST
43RD ST

PARK AVE
40TH ST

MACARTHUR BLVD

SAN PABLO AVE

EMERY ST

VALLEJO STREET

BEAUDRY ST

CHRISTIE AVE

HOLLIS ST HORTON ST
City of Emeryville

DEPARTMENT OF PUBLIC WORKS

C A L I F O R N I A

STREET IMPROVEMENT PLANS FOR

ANNUAL STREET REHABILITATION AND PREVENTIVE MAINTENANCE PROJECT FISCAL YEAR 2021/2022

SHELLMOUND WAY

POWELL ST
PLAZA

MARRIOTT
BAY ST

IKEA EXIT
IKEA

ENTRANCE

WESTGATE
TOWERS

ADELINE ST SHELLMOUND ST

STANFORD ST
63RD ST
6ND ST

SHEET INDEX

DRAWING
T-01
SHEET
1 2

DESCRIPTION

TITLE SHEET
3 D-01 DETAIL SHEET - 1
4 6
7 8
9 10
11 12
13 14
15 16 I-10
I-09
I-08
I-07
I-06
I-05
I-04
I-03
I-02
I-01 PAVEMENT LAYOUT SHEET - 1
D-02 DETAIL SHEET - 2
K-01 KEY PLAN
@ AT

EA EACH
EX. EXISTING

LF LINEAR FOOT

MUTCD CALIFORNIA MANUAL OF TRAFFIC CONTROL DEVICES
O.C. ON CENTER

SF SQUARE FOOT

SSBM STRAP AND SADDLE BRACKET METHOD
TYP. TYPICAL

ABBREVIATIONS
5 D-03 DETAIL SHEET - 3
GENERAL CONSTRUCTION NOTES:

1. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TRAFFIC AS INDICATED IN THE PROJECT SPECIAL PROVISIONS.

2. CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE SPECIAL PROVISIONS, THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS (2015), AND THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD PLANS (2015).

3. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO LOCATE AND PROTECT ALL UTILITIES WHETHER OR NOT SHOWN ON THIS PLAN.

4. PRIME CONTRACTOR BIDDING THIS WORK SHALL HAVE A CLASS "A" OR "C-12".

5. ALL EXISTING IMPROVEMENTS SHOWN HEREON SHALL BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED.

6. SIGNING AND STRIPING INSTALLATIONS SHALL CONFIRM TO THE 2014 CALIFORNIA MANUAL ON UNIFORM

TRAFFIC CONTROL DEVICES (CA MUTCD), THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARD PLANS AND SPECIFICATIONS DATED 2015, AND ALL ADDENDUMS THERETO.

7. ALL STRIPING, MARKINGS AND LEGENDS SHALL BE REFLECTORIZED THERMOPLASTIC UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL PROVIDE AND INSTALL RAISED PAVEMENT MARKERS FOR ALL STRIPING.

STRIPING, MARKINGS AND LEGENDS SHALL CONFORM TO THE LATEST CALTRANS STANDARD PLANS A20A THRU A20D AND A24A THRU A24E.

8. PRIOR TO FINAL ACCEPTANCE OF STREET IMPROVEMENTS, ALL PAVEMENT STRIPING AND STENCILING

WITHIN THE PERIMETER OF THE CONSTRUCTION AREA SHALL BE RESTORED TO LIKE NEW CONDITION, IN A MANNER MEETING THE APPROVAL OF THE CITY OF EMERYVILLE.

9. THE CONTRACTOR SHALL RE-STRIPE EXISTING STRIPING AND CURB MARKINGS OBLITERATED BY NEW CONSTRUCTION, WHETHER OR NOT SHOWN ON THE PLANS FOR REPLACEMENT, AT NO COST OF THE CITY.

10. ALL NEW STRIPING SHALL BE "CAT TRACKED" AND APPROVED BY THE ENGINEER PRIOR TO FINAL INSTALLATION. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER COMPLETING LAYOUT AND ATLEAST 3 WORKING DAYS BEFORE COMMENCING INSTALLATION OF STRIPING, MARKINGS AND MARKERS.

11. STRIPING SHALL BE APPLIED WITHIN 48 HOURS OF SURFACE COURSE REPLACEMENT ON STREETS OPEN TO THE PUBLIC. IN NO CASE SHALL A NEWLY PAVED STREET OPEN TO THE PUBLIC BE LEFT UNSTRIPED OVER A WEEKEND OR HOLIDAY.

12. ALL CONFLICTING STRIPING, PAVEMENT MARKINGS, LEGENDS AND RAISED PAVEMENT MARKERS SHALL BE REMOVED EVEN IF NOT SHOWN ON PLANS. REMOVALS OF PAINTED STRIPING, PAVEMENT MARKINGS AND LEGENDS SHALL BE DONE BY WET SANDBLASTING. REMOVALS OF THERMOPLASTIC STRIPING, PAVEMENT

MARKINGS AND LEGENDS SHALL BE REMOVED BY WET SANDBLASTING, GRINDING OR OTHER APPROVED METHOD AND SHALL NOT DAMAGE THE PAVEMENT. "BLACK OUT" OF EXISTING DELINEATION IS NOT PERMITTED. ALL DAMAGED PAVEMENT DUE TO REMOVALS SHALL BE REPAIRED AS NECESSARY TO MAINTAIN A SMOOTH AND UNIFORM SURFACE OR AS DIRECTED BY THE ENGINEER.

13. WHERE APPLICABLE, OUTBOUND LANE LINE DETAILS SHALL COMMENCE AT THE CROSSWALK, MEANING THE PAINTED PORTION OF THE DETAIL SHALL JOIN THE CROSSWALK.

I-11

YERBA BUENA AVE
D-04 DETAIL SHEET - 4
17 L-10 43RD AND ESSEX ST, 4RD AND ADELINE ST
L-09 43RD AND SALEM ST
L-08 SALEM, ESSEX ST
L-07 45TH AND ADELINE ST
L-06 45TH AND SALEM, 45TH AND ESSEX ST
L-05 47TH AND ADELINE ST
L-04 47TH AND SALEM, 47TH ST
L-03 47TH AND DOYLE, 47TH ST
L-02 45TH AND DOYLE ST
L-01 48TH, SALEM ST
L-11 41ST AND ADELINE, 41ST ST
18 19
20 21
22 23
24 25
26 27
28 PAVEMENT LAYOUT SHEET - 2
PAVEMENT LAYOUT SHEET - 3
PAVEMENT LAYOUT SHEET - 4
PAVEMENT LAYOUT SHEET - 5
PAVEMENT LAYOUT SHEET - 6
PAVEMENT LAYOUT SHEET - 7
PAVEMENT LAYOUT SHEET - 8
PAVEMENT LAYOUT SHEET - 9
PAVEMENT LAYOUT SHEET - 10
PAVEMENT LAYOUT SHEET - 11
PROJECT NO: EPW-21102
I N C O R P O R A T E D 1 8 9 6
June 3rd, 2022
Ryan O'Connell, PE, Senior Civil Engineer6/7/2022
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 * R1-1 * "RIGHT TURN * ONLY" * S1-1 * S4-3P * R30 (CA) * "NO PARKING" LOCAL SIGN * R30 (CA) * "PERMIT PARKING" LOCAL SIGN * R99 (CA) * "NO PARKING LOADING ZONE" * R30 (CA) * "NO PARKING LOADING ZONE" * "NO PARKING LOADING ZONE" * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * "PERMIT PARKING" LOCAL SIGN * R30 (CA) * "PERMIT PARKING" LOCAL SIGN * R30 (CA) * "PERMIT PARKING" LOCAL SIGN * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * S1-1 * S4-3P * LOCAL SIGN * YELLOW SPEED REGULATORY SIGN * R30 (CA) * R2-1 (25) * R30 (CA) * NOPARKING LOADING ZONE SIGNS * LOCAL GUIDE SIGN * R1-1 * R6-5p (MOD) * NO PARKING LOCAL SIGN * R30 (CA) * R30 (CA)* R1-1 * R6-5p (MOD)* "WARNING DRUG FREE SCHOOL ZONE" SIGN * R30 (CA) * SNS * R36 (CA) (MOD) * R30 (CA) * R99 (CA) * YELLOW SPEED REGULATORY SIGN * S1-1 * S4-3P * R1-1 * R30 (CA) * R30 (CA) * R1-1 * R30 (CA) * R30 (CA) * R30 (CA) * NOPARKING LOADING * R1-1 SIGN * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R1-1 * S1-1 * S4-3P * R30 (CA) * R30 (CA) * R30 (CA) * R99 (CA) * R30 (CA) * R1-1 * R30 (CA) * R30 (CA) * R30 (CA) * R1-1 * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R1-1 * "STREET CLOSED AT SALEM" * R36 (CA) (MOD) * LOCAL GUIDE SIGN * R30 (CA) * R30 (CA) * R99 (CA) * R6-5p (MOD) * R1-1 * LOCAL GUIDE SIGNAGE * R30 (CA) * R1-1 * R6-5p (MOD) * R99 (CA) * "BICYCLE BOULEVARD SIGN" * R30 (CA) * R30 (CA) * R1-1 * PUSH BUTTON * R36 (CA) (MOD) * LOCAL BIKE SIGN * R30 (CA) * R99 (CA) * R30 (CA) * R1-1 * LOCAL BIKE SIGN * R30 (CA) * R30 (CA)* R1-1 * R30 (CA) * R30 (CA) * SNS * R1-1* R36 (CA) (MOD) * W17-1 * R30 (CA) * W17-1 * R30 (CA) * R30 (CA) * W17-1 * R30 (CA) * W17-1 * R30 (CA) * R30 (CA) * R1-1 * R3-5(R) * SW52 * "BIKE OK" * R3-5(L) * R30 (CA) * R30 (CA) * W14-2 (CA) * R30 (CA) * W14-2 (CA) * SW52 (CA) * W14-2 (CA) * "BIKE OK" * W17-1 * R99 (CA) * R30(CA) * W17-1 * R30 (CA) * R30 (CA) * R30 (CA) * W17-1 * W17-1 * R30 (CA) * R30 (CA) * SNS * R1-1 * W14-2 (CA) * R30 (CA) * R30 (CA) * R1-1 * R30 (CA) * R30 (CA) * R30 (CA) * CANNOT IDENTIFY SIGN * R1-1 * R30 (CA) * R30 (CA) * R1-1 * R36 (CA) (MOD) * R30 (CA) * R30 (CA) * "15 MPH" * R1-1 * R30 (CA) * R30 (CA) * "15 MPH" * R99 (CA) * R30 (CA) * "RIGHT TURN ONLY" * R1-1 * R30A (CA) * R30A (CA) * R2-1 (15) * R4-7a * W14-1 * UNKNOWN SIGN * R1-1 * R26 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * S1-1 * S4-3P * "15 MPH" * R26 (CA) * R26 (CA) * R26 (CA) * R26 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * SNS * R1-1 * SNS * R6-1 * "NO RIGHT TURN * SNS * R28 (CA) * * SNS * R4-1 * R2-1 (30) * R1-1 * R1-1 * SNS * R1-1 * R1-1 * SNS * S1-1 * SNS * "AFTER STOP RIGHT TURN PERMITTED ON RED" * R1-1 * R1-1 * R2-1 * R1-6 * R30 (CA) BLVD BLVD BLVD BLVD STOP STOPSTOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP BLVD BLVD BLVD BLVD XING SCHOOL SLOW SCHOOL XING SCHOOL SLOW XING SCHOOL SLOW XING SCHOOL SLOW XING SCHOOL SLOW STOP BLVD BLVD STOP SHARE THE PATH BUMP BUMP SHARE THE PATH SHARE THE PATH SHARE THE PATH SHARE THE PATH STOP STOP STOP BUMP BUMP STOP STOP STOP STOP STOP STOP STOP SHARE THE PATH THE PATH SHARE SHARE THE PATH THE PATH SHARE SHARE THE PATH THE PATH SHARE SHARE THE PATH THE PATH SHARE XING SLOW DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

PREFORM VIZIGRIP-GREEN

CONCRETE

SHARED PAVEMENT MARKING

INSTALL NEW OR RELOCATED SIGN ON NEW POST

EXISTING SIGN ON EXISTING POST

BIKE SYMBOLS WITH (PREFORM VIZIGRIP)
K72 MARKER POST

ELECTROLIER - SINGLE ARM

EXISTING HYDRANT

EXISTING PAVEMENT MARKING

PROPOSED PAVEMENT MARKING BLVDBIKE BLVD PAVEMENT MARKING

INSTALL NEW SIGN PANEL ON EXISTING POST

REMOVE EXISTING SIGN PANEL

REMOVE EXISTING SIGN & POST

NEW SIGN PANEL ON NEW POLE
_ _ _ _ DETAILS & CALTRANS STRIPING & MARKING DETAILS
BLVD
BLVD
SSC
HDC
HDA
PM

SIGN POST INSTALLATION

BICYCLE BOULEVARD MARKING

SLOTTED SPEED CUSHION
HATCH DETAIL @ CORNER
HATCH DETAIL @ APPROACH

PAVEMENT MARKINGS
S1
GB1
GB2
CW
CWSM

GREEN BIKE LANE SHARROW

CONFLICT ZONE GREEN BIKE LANE

GREEN BIKE LANE

CONTINENTAL CROSSWALK

STOP BAR & MARKING WITH CROSSWALK
♦
▼
●
▲
■

RELOCATE SIGN PANEL
LL INSTALL 12" WHITE LINE

EXISTING RAMPS
CWSM
22 LL
22 39
39 XX-XX
A
BL INSTALL 4" WHITE STRIPE

PARKING LOSS LOCATIONS

SPEED HUMP
YL INSTALL 6" YELLOW STRIPE
W8-1
W13-1P "15"
23' RED CURB

FROM HERE

DIRECTION OF TRAVEL

DRIVE WAY OR PARKING CLOSED

ALIGN CROSSWALK

GAPS TO WHEEL PATH
◘ INSTALL NEW SIGN PANEL ON EXISTING POLE (SSBM)

PLANTERS
METHYL METHACRYLATE (MMA) "TAN"

EXISTING LOOP DETECTOR

RELOCATE SIGN PANEL TO NEW POLE/SSBM

EXISTING FACE OF CURB

ELECTROLIER - DOUBLE ARM
22 21
2 DIRECTIONAL DRIVE WAY ENTRY / EXIT
1 DIRECTIONAL DRIVE WAY ENTRY / EXIT

WHITE FLEXIBLE MOUNT DELINEATOR
SIGN POST INSTALLATION NOTES:

1. POSTS SHALL BE TELESPAR OR APPROVED EQUAL PERFORATED 4" SQUARE, FOURTEEN (14) GAUGE STEEL POSTS AND MINIMUM 10 FEET IN LENGTH. POSTS

SHALL BE MANUFACTURED FROM HOT-DIPPED GALVANIZED STEEL CONFORMING TO ASTM A 653, G-90, STRUCTURAL QUALITY,L CLASS 1. THE CORNER WELD SHALL BE ZINC COATED AFTER SCARFING OPERATION. THE POST SHALL ALSO BE COATED

WITH A CHROMATE CONVERSION COATING AND CLEAR ORGANIC POLYMER TOPCOAT. BOTH THE INTERIOR AND THE EXTERIOR OF THE POST SHALL BE GALVANIZED. POST SHALL BE HUNTER GREEN POWDER COATING COLOR.

2. ANCHORS SHALL BE TELESPAR OR APPROVED EQUAL PERFORATED 2" SQUARE, TWELVE (12) GAUGE HOT-DIPPED GALVANIZED STEEL ANCHORS. A

TWO-PIECE BREAKAWAY ANCHOR SYSTEM (ANCHOR ASSEMBLY) SHALL BE USED BY WELDING AN EIGHTEEN INCH (18") LONG,TWELVE (12) GAUGE OUTER SLEEVE OF THE NEXT LARGER SIZE PERFORATED TUBE TO THE ORIGINAL 2" SQUARE PERFORATED ANCHOR BASE.

3. THE CONTRACTOR IS RESPONSIBLE TO CAREFULLY REMOVE ANY SIGNS

FROM THE POSTS, REMOVE POSTS FROM THE GROUND WITHOUT CUTTING,

CAREFULLY REMOVE ANY CONCRETE FROM THE POSTS, REPAIR THE POST HOLE,

BIND THE POSTS, COORDINATE WITH THE ENGINEER FOR TRANSPORTATION TO

CITY CORPORATION YARD AND TRANSPORT SIGNS AND POSTS TO THE LOCATION DETERMINED BY THE ENGINEER WITHOUT DAMAGE.

INSTALL NEW OR RELOCATED SIGN PANEL ON

EXISTING LIGHTING OR SIGNAL POLE BY SSBM

BLACK INTERLOCKING SPEED CUSHION

WITH WHITE DOUBLE CHEVRON

ARROWS AND OUTSIDE STRIPING
(TRAFFIC LOGIX OR APPROVED EQUAL)
OR
1 SLOTTED SPEED CUSHION SCALE: NTS 2 BICYCLE BOULEVARD MARKING SCALE: NTS SSC
3 STOP BAR & MARKING WITH CROSSWALK SCALE: NTS
5 SIGN POST INSTALLATION SCALE: NTS
LEGEND:
8'
PARKING 10' RED CURB
6' TYP 4'
VARIES
10' (VARIES) 6' 10' (VARIES)
36'
8'

PARKING
4' 2' 4'
8'

PLAN VIEW

SECTION A-A

SECTION B-B
4' 2' 4'
B
A A
B
W8-1
W13-1P "15"
K72 MARKER POST

OR APPROVED EQUAL
(TYP.) 10' RED CURB 23' RED CURB 3" 3" 3"
NOTE:

INSTALL PER MANUFACTURER'S INSTRUCTIONS
6' X 7' SPEED

CUSHION (TYP)
7' 75.5" 40" 53" 40" 139"
12" 72"

ALIGN CONTINENTAL CROSSWALK

WITH RAMP & PERPENDICULAR TO

DIRECTION OF TRAVEL
8' TYP
5' TYP
12' TYP
2'-6"
8"
7' MI N
SIGN

CLEARANCE
FC
18"
BW
2"
2"
4' MIN
SIGN
POST (SEE NOTE 1)
ANCHOR
(SEE NOTE 2)
CURB
CLASS "B"

CONCRETE
EX. SIDEWALK
* EXISTING POLE & SIGN PANEL TO BE RETAINED
4 CONTINENTAL CROSSWALK CW SCALE: NTS
11'
(OR AS PER PLAN) 2' TYP. 2' TYP.
11'
(OR AS PER PLAN) 2' TYP. 2' TYP.

PAINT CROSSWALK YELLOW
IF WITHIN 500' OF SCHOOL
YL1 INSTALL 4" YELLOW STRIPE
11'
(OR AS PER PLAN) 2' TYP. 2' TYP. TRAVEL LANE BIKE LANE

PREFORMED

GREEN THERMO
PLASTIC (TYP.)
GB
1'
5'
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

TRAVEL LANE
4'-0" 8'-0"
(TYP) (TYP)
DETAIL 39A (TYP.) VARIES

TRAVEL LANE
TRAVEL LANE DETAIL 39A (TYP.)

BIKE LANE

PREFORMED

GREEN THERMO
PLASTIC (TYP.) 5' TYP. (OR AS PER PLAN) VARIES (AS PER PLAN)

TRAVEL LANE

TRAVEL LANE
DETAIL 39 PER PLAN (TYP.)

BIKE LANE
DETAIL NOTE:

BIKE LANE BUFFER

TYPE PER PLAN
12'-0"
(TYP) 6'-0"
12'-0"

WHITE PREFORMED THERMOPLASTIC

SHARROW PAVEMENT MARKING
10'-0" 10'-0"
8' - 6" 19' 0" SEE PLAN

TRAVEL LANE

EXISTING FACE OF CURB
39 BL
14 GREEN BIKE LANE SHARROW S1 SCALE: NTS
8 GREEN BIKE LANE WITH BIKE BUFFER SCALE: NTS
12 BIKE LANE BUFFER DETAILS
SCALE: NTS
6 CONFLICT ZONE GREEN BIKE LANE SCALE: NTS 16' SEE PLAN 5' TYP.
(OR AS PER PLAN)
VARIES
6' MAX

DIRECTION OF TRAVEL
12' O.C. @ 45° STOP
LL
16 SEPARATE BIKE WAY INTERSECTION APPROACH SCALE: NTS
15 ANGLED PARKING DETAIL SCALE: NTS
SBIA
BL
BL
GB
BL
PM
BL
39 FD
KP

EXISTING FACE

OF CURB/ISLAND
FD
12' 0"
12' 0"
5'
4'
4'-0" 8'-0"
(TYP) (TYP)
DETAIL 39A (TYP.) 5' TYP. (OR AS PER PLAN) TRAVEL LANE
4" THICK DASHED

YELLOW CENTERLINE

PREFORMED

GREEN THERMO
PLASTIC (TYP.)
39A
7 CONFLICT ZONE TWO-WAY GREEN BIKE LANE GB1 SCALE: NTS

BIKE LANE

TRAVEL LANE
BIKE LANE 5' TYP. (OR AS PER PLAN)
TRAVEL LANE 5' TYP. (OR AS PER PLAN) VARIES
(AS PER PLAN)
VARIES
(AS PER PLAN)

PREFORMED GREEN
THERMOPLASTIC (TYP.)

PROPOSED CONCRETE ISLAND VARIES (AS PER PLAN)

EXISTING STORM WATER

ISLAND/PLANTER AREA VARIES (AS PER PLAN)
3' TYP.
(OR AS PER PLAN)
VARIES
(AS PER PLAN)
VARIES
(AS PER PLAN)
4' TYP.
(OR AS PER PLAN)

KP VARIES (AS PER PLAN)
DETAIL 39A PER PLAN (TYP.)
VARIES
VARIES
(AS PER PLAN)
3' TYP.

PREFORMED VIZIGRIP

GREEN BACK

BIKE LANE

FACE OF CURB
8'-0" 4'-0" EDGE OF DRIVEWAY
8'-0" 4'-0" VARIES VARIES EDGE OF DRIVEWAY EDGE OF DRIVEWAY EDGE OF DRIVEWAY 5' TYP. (OR AS PER PLAN) VARIES

FACE OF CURB
DIAGONAL 4" WHITE BUFFER STRIPING
12'-0"

DELINEATOR SHALL BE INSTALLED IN
GROUP OF 12' O.C. AS SHOWN IN PLAN VARIES VARIES
10 BIKEWAY BUFFER DELINEATOR PLACEMENT AT TYPE "B" DRIVEWAY APPROACHES SCALE: NTS 11 BIKEWAY BUFFER & DELINEATOR PLACEMENT AT DRIVEWAY APPROACHES SCALE: NTS 9 TYPICAL DELINEATOR PLACEMENT AND SPACING ON BIKEWAY BUFFERS SCALE: NTS 12'-0"
12'-0"
39 BL
39 BL
39 BL
BDTB
BDA
R-5' TYP.
(OR AS PER PLAN) KP 5' TYP. (OR AS PER PLAN)
FD
KP
R-5' TYP.
(OR AS PER PLAN) FD 5' TYP. (OR AS PER PLAN) VARIES (AS PER PLAN)

EXISTING FACE

OF CURB OR BIKE LANE
(AS PER PLAN)
13 LOADING ZONE DETAIL SCALE: NTS 1'
VARIES
(AS PER PLAN)
BL 12'-0"
1' THICK YELLOW

LOADING ZONE MARKING
LZ 1'
1'
1'
1' THICK YELLOW

LOADING ZONE MARKING

FACE OF CURB
8'-0"
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 22 WHITE FLEXIBLE MOUNT DELINEATOR SCALE: NTS 30"
FD
STOP

ONLY STOP
NOTE :- REFER TO CALTRANS STANDARD
PLANS IF REQUIRED.

LINK: https://dot.ca.gov/-/media/dot-media/programs/
design/documents/2018-std-plns-for-web-a11y.pdf
XING
SLOW

SCHOOL BUMP
19 K72 MARKER POST SCALE: NTS
GREY
KP
8' 36'
12'
NOTE :- MARKINGS TO BE PAINTED IN YELLOW
COLOR IF WITHIN 500FT FROM SCHOOL.
17 PAVEMENT MARKINGS PM SCALE: NTS
18 PAVEMENT MARKINGS - BIKE PM SCALE: NTS
20 PROPOSED SIGNAGE CHART SCALE: NTS
20'
(TYP) MIN 4' (OR AS PER PLAN)
5'
(TYP)
6'
(TYP)
6'
(TYP)

PREFORMED GREEN
THERMO PLASTIC (TYP.)

TRAVEL LANE

BIKE LANE

WHITE THERMO
PLASTIC (TYP.)
SHARE
THE PATH 1"
1"
3' 3'

PREFORMED YELLOW
THERMOPLASTIC (TYP.)

PREFORMED WHITE
THERMOPLASTIC (TYP.)
23 BIKE PED SHARE PATH DETAIL BPS SCALE: NTS
24 BIKE WITH ARROW ON GREEN BASE BPS SCALE: NTS
W84 (CA) W8-1 W13-1P"15" R1-1 W11-15 R2-1"15"
W11-15P
S1-1 W16-7P W11-2 R5-1 R10-15MOD-A R10-15MOD-B
R25A (CA) R6-5P
R9-5 R81A(CA) R81B(CA)
NOTE : All BIKE MARKINGS ARE PREFORM
21 PARKING TIPS DETAIL SCALE: NTS 8' TYP 7' MIN
20'
TYP
22'
TYP
18' MIN 20' MIN

EXISTING FACE
OF CURB 1'
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 STOP
CALTRANS A87A
A1-1 CURB

VARIES PER PLAN
25 PROTECTED CORNER SCALE: NTS
RAISED PAVEMENT 1"
DGAC
RP
GB

CW CROSSWALK

ANGLE PER PLAN VARIES PER PLAN
KP

MARKING VARY PER PLAN
6'
BPS 6"
CALTRANS A87A
A1-1 CURB
6" 1"WIDTH VARIES PER PLAN
2:1 SLOPE
2"
26 RAISED PAVEMENT 1" RP SCALE: NTS
RAISED PAVEMENT 1"
DGAC

SCORE EXISTING PAVEMENT
RP
A-A

SECTION A-A
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 SLR
SLR 27' 27'
32'
36' 27' 27'

TO EXISTING

PAVING SEAM TO EXISTING

PAVING SEAM
SLR
27' 27'

TO EXISTING

PAVING SEAM
54'
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 36' SLR
RP
DIG
6C
4C
6CG
RAMP
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR

RAMP CASE C
33' 26'

TO EXISTING

PAVING SEAM

10.5'

17.5' 7.5' 34' 45'
34'
28'

TO EXISTING

PAVING SEAM
SLR
9'
6' 5' 5.0'
crosoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS RAMP CASE C

10.5'

17.5' 7.5' 5.0'
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR
4C
6CG
6CG

RAMP CASE A

RAMP CASE C
DIG
DIG
45'
52'
40'
15' 11' 20'

17.5' 7' 6'

1.0' 1.0'

6.5'

3.0'

6.0' 3.5'
R3.5' 3.0' 9.0' 6.5' 4.0' 4.0'
249.0' 4.0'

14.5' 13.5'
R2.0'

5.0' 16.0' 12.5'

17.5' 13.0'

2.5' 15.0' 2' 2' 2' 3.0' 2.0'

12.0' 11' 11.0'

9.5' 6.0' 6.5' 3.0' 2.5'

4.0' 7.5'

3.5' 3.5' 6.5'

15.0'

5.5' 6.5' 28' 37' 37'

RAMP CASE A
SLR 37' 37' 44' 37' 31'
4C
6CG
6CG

RAMP CASE A

RAMP CASE C
DIG
DIG

15.5' 3.5' R6.5'
R4.5'

17.5' 7.5'

3.0' 2.0' R6.5'

1.0'

6.5'

3.0' 9.5' 4.0' 4.0'
249.0' 4.0'

8.0' 7.5'

14.5' 13.5' 4.5'

12.0' 11.0'
R2.0'
R5.0'

16.0' 9.0' 3.5' 6.5'

5.0' 12.5' 10.0'

17.5' 13.0'

1.0'

2.5' 15.0' 3.0' 2.0'

15.0'

RAMP CASE A
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DIG
SLR

SLR SLR
4C
RAMP CASE A 6C
RAMP CASE A 57' 44' 48' 46' 3.0' 2.0' 21.0' 7.5' 5.5' 7.0' 3.5' 6.0'

2.0' 4.0' R2.0' 2.0' 5.5' 1.5' R2.0' R20.0' 6.0' 18.0' 3.0' 4.0'

5.5' R4.0'
R1.0'

TO EXISTING

PAVING SEAM
R1.0'
R1.0' 3.0'4.5' R1.0' 5.5' 3.0' 10.0' 4.0' 4.0' 2.0' R1.0' 11.5'

17.5'

6.5'4.0'3.5'
TOP SOIL 10.0' 11.5' 3.5'6.5'4.0' 13.5'

TO EXISTING

PAVING SEAM
DIG
SLR 48' 48' 48' 48'

PAVING SEAM
DIG
4C
RAMP CASE A 6C
RAMP CASE A 17.5' 12.5' 10.0' 10.0'

17.5' 12.5' 5.5' 2.5' 3.0' 2.0' 2.5' 4.0' 5.5' 1.5'

7.0' 5.5' 5.0' 19.5'

5.0' 9.0' 1.5' 12.5' 8.0'

5.0'21.0' 2.0'

5.0' 5.0' 6.0' 2.0' R5.0'

1.5' 13.5' 10.0' 1.5' 9.0' 4.0'

6.0' R3.0' R3.0' 2.0' 1.5' 6.0' 2.0' 1.5' 1.5' 2.0' 2.0' DIG
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR
RP
6C
RP
6C
RP 48.0' 29.0'

10.0'

2.5'

13.0'

3.0'

12.0'

7.5' 2.5'
R0.5'
R0.5'

24.5' 2.0'

0.5'

12.0'
R0.5' R0.5'

7.5' 4.5'

4.0'

14.5'
R0.5'

14.0'2.0'
R0.5'

7.0' 7.5'

4.5'

4.5'
R0.5'

55.0'

55.0'
2483.5'

TO THE EDGE OF

DRIVEWAY
6C
6C

8.5'

8.0'

7.0'
R23.5'

26.0'

4.0'
R18.0'
R14.0'

5.5'

16.5' R30.0'

14.0' 5.0'

4.5'

10.0'

11.0'

7.5'

15.5'

4.0' 16.5' 4.0'

4.0'

4.0' 0.5'

4.0'0.5'

2.0'

TO THE EDGE

OF DRIVEWAY
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR

TO EXISTING
PAVING SEAM 48' 45' 44' 48'
33'
SLR
SLR 48'40' 46' 48' 40'48'
34'

TO EXISTING

PAVING SEAM
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 202 SLR
RP
6C
RP
6C CVR MH DIGCS 31.5' 38.0' 3.0' 5.5' 4.5' 16.0' 48.0' R0.5' 48'39' 48' 54' 37'44' 1.5'15.5' 15.0' 3.0' 4.0' 24.5'24.0' R0.5' 2.0' 12.0' 17.5'

TO THE EDGE OF

CROSSWALK
6C
6C 6.0' 4.0'19.5' 16.0' 7.5' 27.5' 18.5' 3.5' 23.0' 4.0' 14.5' 4.0' 15.5' 4.0' 0.5' 4.5' 6.0' 4.0' 14.0' 35.0' 15.5' 5.0' 39.0' 49.0' 7.0' 4.0' 2.0'

TO THE EDGE OF

CROSSWALK
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR 33' 34' 36' 36' © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR 34' 36'
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR SLR SLR 48' 48' 37'48'
33'

TO EXISTING

PAVEMENT SEAM

TO EXISTING

PAVEMENT SEAM
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR
SLR
6CG
RP
6C 48'

TO THE EDGE OF

DRIVEWAY

TO THE EDGE OF

DRIVEWAY

TO EXISTING
PAVEMENT SEAM 48' 40'
32' 14'2'

6.0'

13.5' 20.5'
R0.5' 10.0' 14.0'

10.0'

3.5'
R0.5'

13.0'

14.5' 15.0'2.0'

5.0' 0.5'

10.5'

36.0'
50' FROM THE EDGE

OF TRAVEL LANE

47.0'

56.0'

56.0'

50.0'
2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 6CG 6C

4.5'

16.5'

4.0'

19.0'

4.0' 3.0'

7.0'

16.0' 22.0'

10.5' 3.0'

9.5'

17.5'

26.5' 6.0'

1.0' 14.0'

3.0'
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 on © 2022 Maxar ©CNES (2022) Distribution
SLR

RAMP CASE A

TO EXISTING

PAVEMENT SEAM

7.0' 6.0'

8.5'

3.5'

6.0' 8.0'

1.5'

17.5'

3.5'

2.0' 47' 46'
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distr 022 Maxar ©CNES (2022) Distribution Airbus DS on © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR
RP
6C
6C

RAMP CASE A
DIG

TO THE EDGE

OF DRIVEWAY

TO THE EDGE
OF DRIVEWAY 48'38' 48'
54'
46'
34' 12.0'

4.0'

6.5' 6.5' 29.5' 2.0'2.0'

0.5'34.0'
R1.5' 10.5' 28.0' 2.0'

0.5'30.5'

2.5'
R0.5'

7.0' 4.0' R2.5'
R12.5' 13.5'

14.0'

5.0'

20.5'

2.0'

0.5'

4.0' 14.0'5.0'

2.5' 3.0' 9.5'
R0.5'
R0.5'

8.0'
R6.0'

3.5'11.5'
R0.5'

5.0'

6.0' 1.5'

24.0'

4.0' 26.0'
63' FROM THE

EDGE OF TRAVEL WAY
63'
56'
6C
6C

RAMP CASE A
DIG 12.5' 17.5'2.5' 34.5'

1.0' 1.0'

1.5' R3.0' R2.0'
R1.5'

1.0'

12.0' 8.0'
R13.5'

15.5'

12.0'

7.5' 13.0' 4.0'

4.0'

2.5' 22.5' 2.0' 8.5' 11.5'

37.0'

11.0'4.0'

41.0'

12.0' 30.0'

14.0'

5.5'

11.0' R7.0'

15.5' 4.0' 9.0'

4.0'

26.5'

8.0' 1.5' 6.0'

7.0'

30.0'

6.0'
R13.5'
RAMP CASE A 8.0'

6.0' 7.0' 2.5'

2.5'

20.0'
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 * R1-1
* R30 (CA) * CANNOT

IDENTIFY
SIGN * R1-1
* R30 (CA) * R30 (CA)
* "15 MPH" * R1-1
* R30 (CA) * R30 (CA) * "15 MPH" * R99 (CA)
* "RIGHT TURN ONLY" * R30 (CA) * R1-1
* R1-1
* R30 (CA) * CANNOT

IDENTIFY
SIGN * R1-1
* R30 (CA) * R30 (CA)
* "15 MPH" * R1-1
* R30 (CA) * R30 (CA) * "15 MPH" * R99 (CA)
* "RIGHT TURN ONLY" * R30 (CA) * R1-1 STOP

STOP STOP STOP
22 22
PM
LL
CW
30' 30' 11' 30'
30'
* R1-1
* R36 (CA) (MOD) * R30 (CA)
* R30 (CA)
* R1-1
* R36 (CA) (MOD) * R30 (CA)
* R30 (CA)
STOP

BUMP BUMP
22 PM
LL
01-02
♦ W8-1
♦ W13-1P "15"
01-03
♦ W8-1
♦ W13-1P "15"
01-04
01-01
♦ W84
♦ W84
PM
PM
SSC
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA)
R30 (CA) * R30 (CA)
* R30 (CA)
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA)
R30 (CA) * R30 (CA)
* R30 (CA)
STOP
22 PM
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R1-1 * R26 (CA)
* R26 (CA) * R26 (CA) * R26 (CA) * R30 (CA)
* R30 (CA)
* SNS
* R1-1 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R1-1 * R26 (CA)
* R26 (CA) * R26 (CA) * R26 (CA) * R30 (CA)
* R30 (CA)
* SNS
* R1-1 SHARE THE PATH
CW
27B
22 SB2
PM
LL
27B
39 22
PM
FD
KP
BPS
22 27B
BL
39 22
BL
PM
02-04
♦ R2-1 "15"
02-03
♦ W11-15
02-02
R1-1
52' 11'
29'
14'
17'
26'
23'
20'
54' 54'
49' 50'
37'
11' 11'
8' 10' 10'
2' 15'
7'
11' 11' 10' 10'
18' 11'
10'
17'
17'
67'
5'
3'
4' 1'
28' 20'
FD
FD
8' 25' 22' 23' 314'
128'
02-01
R1-1
SNS

EXISTING AFFECTED PARKING
LOSS = 5 SPACE

EXISTING AFFECTED PARKING
LOSS = 10 SPACE EXISTING AFFECTED PARKING LOSS = 1 SPACE EXISTING AFFECTED PARKING LOSS = 1 SPACE 6'

LOCATION LOSS OF PARKING SPACES
10 PARKING GAIN/LOSS (THIS SHEET)
L-02
TOTAL 17 (LOSS)
L-02 5
A
B
A
B
L-02 C 1
L-02 D 1
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R2-1 (15) * R4-7a * W14-1 * UNKNOWN SIGN * R26 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * S1-1 * S4-3P * "15 MPH" * R30 (CA) © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R2-1 (15) * R4-7a * W14-1 * UNKNOWN SIGN * R26 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * S1-1 * S4-3P * "15 MPH" * R30 (CA) SLOW SCHOOL XING SHARE THE PATH BUMP BUMP SHARE THE PATH SHARE

THE PATH SHARE
THE PATH ■ KP
22 22
PM
CW
BPS
BM
22 YL1
22 39
22 BPS
FD
BL
BL
BL
39A
GB1
KP
03-03 ♦ W2-1 "15"
03-01 ♦ W11-15P
03-02
W11-15P
03-06 ♦ S1-1 ♦ W16-7P
03-05 ♦ S1-1 ♦ W16-7P
W84 (CA)
03-04 ■
10' 10' 17'
15' 2'
11'
6' 23' 9' 81' 17' 77' 40' 8.5' 10' 8'
15'
16'
30' ▲ 16'
SSC 52' 74'
133'
112'
30' 15' 2'

EXISTING AFFECTED PARKING
LOSS = 7 SPACE

EXISTING AFFECTED PARKING
LOSS = 6 SPACE EXISTING AFFECTED PARKING LOSS = 5 SPACE * R30A (CA) XINGBUMP BL PM
39 03-07 ♦ W84(CA)
LOCATION LOSS OF PARKING SPACES 7

PARKING GAIN/LOSS (THIS SHEET)
L-03
TOTAL 13 (LOSS)
L-03 6 AB A B
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 * R1-1
* R3-5(R) * SW52
* "BIKE OK"
* R3-5(L) * R30 (CA) * R30 (CA)
* W14-2 (CA) * R30 (CA) * W14-2 (CA) * SW52 (CA)
* W14-2 (CA) * "BIKE OK"
* W14-2 (CA)
* R1-1
* R3-5(R) * SW52
* "BIKE OK"
* R3-5(L) * R30 (CA) * R30 (CA)
* W14-2 (CA) * R30 (CA) * W14-2 (CA) * SW52 (CA)
* W14-2 (CA) * "BIKE OK"
* W14-2 (CA) BLVD BLVD BLVD BLVD STOP

STOP SCHOOL SLOW
PM
39 22
PM
FD
39 39
PM
39 CW
BL
PM
LL
KP
04-01
♦ W11-2
♦ W16-7P
04-02
♦ W11-2
♦ W16-7P
11' 11' 15' 10'
10' 8' 11'
32' 24' 25' 36'
04-07
♦ R5-1
04-06
♦ R5-1
■
BLVD
CW 14' 16' 4' 14'
6'
04-03
♦ R25A(CA)
04-04
♦ R25A(CA)
04-05
■ R25A(CA)
25' 293'
283'
100'
40'

EXISTING AFFECTED PARKING
GAIN = 2 SPACE

EXISTING AFFECTED PARKING
GAIN = 2 SPACE
* R30 (CA) * R30 (CA) * W17-1
* R30 (CA) * W17-1 R1-1 * R30 (CA)
R3-5(R)
* W17-1
* R99 (CA) * R30(CA) * W17-1 * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * W17-1
* R30 (CA) * W17-1 R1-1 * R30 (CA)
R3-5(R)
* W17-1
* R99 (CA) * R30(CA) * W17-1 * R30 (CA) * R30 (CA) * R30 (CA) STOP 22 39 39
39 39
CM 8' 6' 11' 11' 6' 8'

LOCATION LOSS OF PARKING SPACES
-2

PARKING GAIN/LOSS (THIS SHEET)
L-04
TOTAL 4 (GAIN)
A
A
L-04 B -2
B
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * "STREET CLOSED AT SALEM" * R36 (CA) (MOD) * W17-1
* R30 (CA) * W17-1
* R30 (CA)
R30 (CA)
R30 (CA) * W17-1 * W17-1 * R30 (CA) * R30 (CA) * SNS
* R1-1
* R1-1
* R1-1
* R2-1
* R1-6
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * "STREET CLOSED AT SALEM" * R36 (CA) (MOD) * W17-1
* R30 (CA) * W17-1
* R30 (CA)
R30 (CA)
R30 (CA) * W17-1 * W17-1 * R30 (CA) * R30 (CA) * SNS
* R1-1
* R1-1
* R1-1
* R2-1
* R1-6 STOP
STOP
STOP
CM
22 39
39 39
39 BM
BM
39A
DG
KP 8' 6' 11' 11' 6' 8'
1'
11'
11'
9'
5' 2'
11'
10'
6' 5'
11'
6'
13'

10.5' 5'
9'
11'
05-02
05-03
05-01
♦ R10-15MOD-B-R
♦ R25A(CA)
♦ R25A(CA)
05-04
♦ R10-15MOD-B-L
LZ

2.5'5'

10.5' 7.0' 5.0'

10.5'

9.0'

7.0'

4.0'

4.0' 22' 10.5' 2.0' 5.0'
44'
YL1

EXISTING AFFECTED PARKING
LOSS = 2 SPACE

LOCATION LOSS OF PARKING SPACES
2 PARKING GAIN/LOSS (THIS SHEET)
L-05
TOTAL 2 (LOSS)
A
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R1-1 * LOCAL GUIDE
SIGNAGE * R30 (CA) * R1-1 * R6-5p (MOD) * R99 (CA) * "BICYCLE BOULEVARD SIGN" * R30 (CA) * R30 (CA) * R1-1 * PUSH
BUTTON * R36 (CA) (MOD) * LOCAL BIKE
SIGN * R30 (CA) * R99 (CA) * R30 (CA) * R1-1 * LOCAL BIKE SIGN * R30 (CA) © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R1-1 * LOCAL GUIDE
SIGNAGE * R30 (CA) * R1-1 * R6-5p (MOD) * R99 (CA) * "BICYCLE BOULEVARD SIGN" * R30 (CA) * R30 (CA) * R1-1 * PUSH
BUTTON * R36 (CA) (MOD) * LOCAL BIKE
SIGN * R30 (CA) * R99 (CA) * R30 (CA) * R1-1 * LOCAL BIKE SIGN * R30 (CA) STOP

STOP STOP BLVD BLVD BLVD SLOW SCHOOL XING SCHOOLSTOP XING SLOW 39 22
PM
BLVD
LL
39 KP
22 CW
CW
22 11'
28' 11' 13' 11.5' 11' 13'
06-07 ▲ ■ R6-5P
06-08
06-09 ■ R6-5P ■ R6-5P
BLVD
06-01
06-02
06-03 * R1-1 * R99 (CA) * R30 (CA) * R6-5p (MOD) * R1-1 * R30 (CA)* R1-1 * R30 (CA) * R1-1 * R99 (CA) * R30 (CA) * R6-5p (MOD) * R1-1 * R30 (CA)* R1-1 * R30 (CA) STOP

STOP STOP BLVD BLVD SLOW
22 39
22 39
PM
CW
CW
LL
11' 11' 13' 11.5' 11' 13' 14' 11.0' 10' ▲ 13'
06-10 ■ R6-5P
06-12
R6-5P
06-11 ■ R6-5P ■
BLVD
BLVD
06-04 06-05 06-06
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * LOCAL GUIDE SIGN * R30 (CA) * R30 (CA) * SNS * R1-1* R36 (CA) (MOD) © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * LOCAL GUIDE SIGN * R30 (CA) * R30 (CA) * SNS * R1-1* R36 (CA) (MOD) BLVD STOP 39 22
39 PM
39 39A
DG
KP
22 39
39 BL
22 14' 11.0' 10' 13' 11.0' 6' 11' 10.5' 6'
07-03 ♦ R10-15MOD-B-R
07-02 ■ R10-15MOD-B-L
07-01 ♦ R10-15MOD-B-R
39A

10.5' 5.0' 10.5' 5.0' 10.5' 13.0' 10.5' 15.0' 22' 10.5' 2.0' 5.0' DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * S1-1 * S4-3P * R30 (CA) * R30 (CA) * R30 (CA) * R99 (CA) * R30 (CA) * 2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * S1-1 * S4-3P * R30 (CA) * R30 (CA) * R30 (CA) * R99 (CA) * R30 (CA) * STOP STOP © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) STOP STOP DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * S1-1 * S4-3P
* LOCAL
SIGN
* YELLOW
SPEED

REGULATORY
SIGN
* R30 (CA) * R2-1 (25) * R30 (CA) * NO

PARKING

LOADING
ZONE
SIGNS
* LOCAL
GUIDE
SIGN
* R1-1
* R6-5p (MOD)
* NO PARKING

LOCAL SIGN
* R30 (CA)
* R30 (CA) * R1-1
* R30 (CA) * R30 (CA) * R30 (CA) * NO

PARKING

LOADING
SIGN
* R1-1
* R1-1
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * S1-1 * S4-3P
* LOCAL
SIGN
* YELLOW
SPEED

REGULATORY
SIGN
* R30 (CA) * R2-1 (25) * R30 (CA) * NO

PARKING

LOADING
ZONE
SIGNS
* LOCAL
GUIDE
SIGN
* R1-1
* R6-5p (MOD)
* NO PARKING

LOCAL SIGN
* R30 (CA)
* R30 (CA) * R1-1
* R30 (CA) * R30 (CA) * R30 (CA) * NO

PARKING

LOADING
SIGN
* R1-1
* R1-1 STOP
STOP STOPSLOW SCHOOL XING XING SCHOOL STOP 39
22 PM
LL
22 CW 22
CM
22 KP
39 39
39 13' 10.5' 12' 13' 11'
11'
09-04
■ R6-5P
09-05
■ R6-5P
09-06
■ R6-5P
▲
09-01
09-02
09-03
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA)* R1-1
* R6-5p (MOD)
* "WARNING DRUG FREE
SCHOOL ZONE" SIGN
* R30 (CA)
* SNS
* R36 (CA) (MOD) * R30 (CA) * R99 (CA) * YELLOW SPEED

REGULATORY
SIGN
* S1-1
* S4-3P
* R1-1 * R30 (CA)
* R30 (CA)
* R30 (CA)
* R1-1
* S1-1
* SNS
* "AFTER STOP RIGHT

TURN PERMITTED ON
RED"
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA)* R1-1
* R6-5p (MOD)
* "WARNING DRUG FREE
SCHOOL ZONE" SIGN
* R30 (CA)
* SNS
* R36 (CA) (MOD) * R30 (CA) * R99 (CA) * YELLOW SPEED

REGULATORY
SIGN
* S1-1
* S4-3P
* R1-1 * R30 (CA)
* R30 (CA)
* R30 (CA)
* R1-1
* S1-1
* SNS
* "AFTER STOP RIGHT

TURN PERMITTED ON
RED"

STOP STOP SLOW STOP
22 LL
CM
CM
22 39
22 39
39 39
KP
GB
39A
BL
CW 13' 11' 11' 13'
11' 11'
11'
13'
1'
57'
11'
11'
6' 10.5' 10.5' 6.5'

11.5'
11'
9'
7'
12'

10.5' 6'

11.5'
5'
5'
▲
10-10
■ R6-5P
10-11
■ R6-5P
10-12
■ R6-5P
10-04
10-05
■ R10-15MOD-A-L
♦ R10-15MOD-A-R
10-07
10-06
♦ R10-15MOD-A-R
■ R10-15MOD-A-L
CW
LL
10-08
R9-5
10-09
R9-5
3' 10.5' 10.5'

3.5'

5.0'
5'
1'
7'
18'
10' 17'
◘
◘
10-01 10-02 10-03
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 on © 2022 Maxar ©CNES (2022) Distribution Airbus DS
* R1-1
* "RIGHT TURN
* ONLY"
* "NO PARKING LOADING
ZONE" * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA)
* R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA)
* SNS
* R6-1
* "NO RIGHT TURN
* R30 (CA)
on © 2022 Maxar ©CNES (2022) Distribution Airbus DS
* R1-1
* "RIGHT TURN
* ONLY"
* "NO PARKING LOADING
ZONE" * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA)
* R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA)
* SNS
* R6-1
* "NO RIGHT TURN
* R30 (CA) STOP SHARE THE PATH SHARE THE PATH SHARE THE PATH SHARE THE PATH SHARE THE PATH SHARE THE PATH 39 KP
39 BL
PM
22 GB1
39 39A 8' 12' 8' 8' 6' 6'
11-01
♦ R10-15MOD-A-R
11-02
♦ W11-15P 12' 2' 4' 4'
6'
6'
20'
29'
■ R81B
11-09
70'

EXISTING AFFECTED PARKING
LOSS = 8 SPACE

EXISTING AFFECTED PARKING
LOSS = 9 SPACE

EXISTING AFFECTED PARKING
GAIN = 5 SPACE
EXISTING AFFECTED PARKING © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distr 022 Maxar ©CNES (2022) Distribution Airbus DS on © 2022 Maxar ©CNES (2022) Distribution Airbus DS * S1-1
* S4-3P
* R30 (CA) * "NO PARKING" LOCAL
SIGN
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* R99 (CA) * "NO PARKING
LOADING ZONE" * R30 (CA) * "NO PARKING LOADING
ZONE"
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* SNS
* R28 (CA) * R28 (CA)
* SNS
* R4-1
* R2-1 (30) * R1-1
* R1-1
* SNS
* R1-1
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distr 022 Maxar ©CNES (2022) Distribution Airbus DS on © 2022 Maxar ©CNES (2022) Distribution Airbus DS * S1-1
* S4-3P
* R30 (CA) * "NO PARKING" LOCAL
SIGN
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* R99 (CA) * "NO PARKING
LOADING ZONE" * R30 (CA) * "NO PARKING LOADING
ZONE"
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* SNS
* R28 (CA) * R28 (CA)
* SNS
* R4-1
* R2-1 (30) * R1-1
* R1-1
* SNS
* R1-1 STOP
STOP

STOP SHARE THE PATH SHARE THE PATH
KP 39
22 BL
GB1
39 CW
41 8' 12' 16' 6' 11'
11'
5'
5'
5'
5'
5'
11-03
♦ W11-15P
11-04
♦ W11-15P
11-07
11-08
■ R10-15MOD-A-L
♦ R10-15MOD-A-R
11-06
■ R10-15MOD-A-L
11-05
♦ R10-15MOD-A-R
GB 12' 8' 2' 5' 4'
1'
11'
14' 10'
1' 11'
8'
8'
10'

10.5'

10.5'
5'
6'
2'
6'
5' 10.5'

10.5'
4'
4' 5'

11.0'

11.0'

12.4'
11-10
R25E
■
R81A
11-11
R99
53'
120'
22'
YL1
■
▲
▲ 6'41'

EXISTING AFFECTED PARKING
GAIN = 2 SPACE

EXISTING AFFECTED PARKING
LOSS = 2 SPACE

EXISTING AFFECTED PARKING
LOSS = 1 SPACE LOCATION LOSS OF PARKING SPACES
9 PARKING GAIN/LOSS (THIS SHEET)
L-11
TOTAL 13 (LOSS)
L-11 -5
A
B
L-11 C 8
L-11 D -2
L-11 E 2
A B
C
D E
F
L-11 F 1
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Addendum No. 2 Page 1 of 1

ANNUAL STREET REHABILITATION AND

PREVENTIVE MAINTENANCE PROJECT
FISCAL YEAR 2021/2022
(PROJECT NO. EPW-21102)
ADDENDUM NO. 2
June 16, 2022
To All Plan Holders:

Notice is hereby given that the following changes to the bid documents have been made for the above referenced project:

Part A – CONTRACT DOCUMENTS

1. Notice Inviting Bids
a. Notice is hereby given that the Bid Opening Date Annual Street Rehabilitation and Preventive Maintenance Project Fiscal Year 2021/2022, Project No. EPW-21102 is hereby revised to be Thursday, June 30, 2022 at 2:00 p.m.

Signature of this Addendum Sheet and inclusion of it with the Proposal is required at the time of bid opening.

Date: June 16, 2022by:___________________________
Ryan O’Connell, PE
Senior Civil Engineer
Company Name: ___________________ Authorized Signature:_________________ Authorized Name: ___________________ Date: ______________________ DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 66TH ST
67TH ST
65TH ST
59TH ST

POWELL ST
53RD ST
45TH ST
43RD ST

PARK AVE
40TH ST

MACARTHUR BLVD

SAN PABLO AVE

EMERY ST

VALLEJO STREET

BEAUDRY ST

CHRISTIE AVE

HOLLIS ST HORTON ST
City of Emeryville

DEPARTMENT OF PUBLIC WORKS

C A L I F O R N I A

PAVEMENT DELINEATION PLANS FOR

ANNUAL STREET REHABILITATION AND PREVENTIVE MAINTENANCE PROJECT FISCAL YEAR 2021/2022

SHELLMOUND WAY

POWELL ST
PLAZA

MARRIOTT
BAY ST

IKEA EXIT
IKEA

ENTRANCE

WESTGATE
TOWERS

ADELINE ST SHELLMOUND ST

STANFORD ST
63RD ST
6ND ST

SHEET INDEX

DRAWING
T-01
SHEET
1 2

DESCRIPTION

TITLE SHEET
3 D-01 DETAIL SHEET - 1
4 6
7 8
9 10
11 12
13 14
15 16 I-10
I-09
I-08
I-07
I-06
I-05
I-04
I-03
I-02
I-01 PAVEMENT LAYOUT SHEET - 1
D-02 DETAIL SHEET - 2
K-01 KEY PLAN
@ AT

EA EACH
EX. EXISTING

LF LINEAR FOOT

MUTCD CALIFORNIA MANUAL OF TRAFFIC CONTROL DEVICES
O.C. ON CENTER

SF SQUARE FOOT

SSBM STRAP AND SADDLE BRACKET METHOD
TYP. TYPICAL

ABBREVIATIONS
5 D-03 DETAIL SHEET - 3
GENERAL CONSTRUCTION NOTES:

1. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN TRAFFIC AS INDICATED IN THE PROJECT SPECIAL PROVISIONS.

2. CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE SPECIAL PROVISIONS, THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS (2015), AND THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD PLANS (2015).

3. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO LOCATE AND PROTECT ALL UTILITIES WHETHER OR NOT SHOWN ON THIS PLAN.

4. PRIME CONTRACTOR BIDDING THIS WORK SHALL HAVE A CLASS "A" OR "C-12".

5. ALL EXISTING IMPROVEMENTS SHOWN HEREON SHALL BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED.

6. SIGNING AND STRIPING INSTALLATIONS SHALL CONFIRM TO THE 2014 CALIFORNIA MANUAL ON UNIFORM

TRAFFIC CONTROL DEVICES (CA MUTCD), THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) STANDARD PLANS AND SPECIFICATIONS DATED 2015, AND ALL ADDENDUMS THERETO.

7. ALL STRIPING, MARKINGS AND LEGENDS SHALL BE REFLECTORIZED THERMOPLASTIC UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL PROVIDE AND INSTALL RAISED PAVEMENT MARKERS FOR ALL STRIPING.

STRIPING, MARKINGS AND LEGENDS SHALL CONFORM TO THE LATEST CALTRANS STANDARD PLANS A20A THRU A20D AND A24A THRU A24E.

8. PRIOR TO FINAL ACCEPTANCE OF STREET IMPROVEMENTS, ALL PAVEMENT STRIPING AND STENCILING

WITHIN THE PERIMETER OF THE CONSTRUCTION AREA SHALL BE RESTORED TO LIKE NEW CONDITION, IN A MANNER MEETING THE APPROVAL OF THE CITY OF EMERYVILLE.

9. THE CONTRACTOR SHALL RE-STRIPE EXISTING STRIPING AND CURB MARKINGS OBLITERATED BY NEW CONSTRUCTION, WHETHER OR NOT SHOWN ON THE PLANS FOR REPLACEMENT, AT NO COST OF THE CITY.

10. ALL NEW STRIPING SHALL BE "CAT TRACKED" AND APPROVED BY THE ENGINEER PRIOR TO FINAL INSTALLATION. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER COMPLETING LAYOUT AND ATLEAST 3 WORKING DAYS BEFORE COMMENCING INSTALLATION OF STRIPING, MARKINGS AND MARKERS.

11. STRIPING SHALL BE APPLIED WITHIN 48 HOURS OF SURFACE COURSE REPLACEMENT ON STREETS OPEN TO THE PUBLIC. IN NO CASE SHALL A NEWLY PAVED STREET OPEN TO THE PUBLIC BE LEFT UNSTRIPED OVER A WEEKEND OR HOLIDAY.

12. ALL CONFLICTING STRIPING, PAVEMENT MARKINGS, LEGENDS AND RAISED PAVEMENT MARKERS SHALL BE REMOVED EVEN IF NOT SHOWN ON PLANS. REMOVALS OF PAINTED STRIPING, PAVEMENT MARKINGS AND LEGENDS SHALL BE DONE BY WET SANDBLASTING. REMOVALS OF THERMOPLASTIC STRIPING, PAVEMENT

MARKINGS AND LEGENDS SHALL BE REMOVED BY WET SANDBLASTING, GRINDING OR OTHER APPROVED METHOD AND SHALL NOT DAMAGE THE PAVEMENT. "BLACK OUT" OF EXISTING DELINEATION IS NOT PERMITTED. ALL DAMAGED PAVEMENT DUE TO REMOVALS SHALL BE REPAIRED AS NECESSARY TO MAINTAIN A SMOOTH AND UNIFORM SURFACE OR AS DIRECTED BY THE ENGINEER.

13. WHERE APPLICABLE, OUTBOUND LANE LINE DETAILS SHALL COMMENCE AT THE CROSSWALK, MEANING THE PAINTED PORTION OF THE DETAIL SHALL JOIN THE CROSSWALK.

I-11

YERBA BUENA AVE
D-04 DETAIL SHEET - 4
17 L-10 43RD AND ESSEX ST, 4RD AND ADELINE ST
L-09 43RD AND SALEM ST
L-08 SALEM, ESSEX ST
L-07 45TH AND ADELINE ST
L-06 45TH AND SALEM, 45TH AND ESSEX ST
L-05 47TH AND ADELINE ST
L-04 47TH AND SALEM, 47TH ST
L-03 47TH AND DOYLE, 47TH ST
L-02 45TH AND DOYLE ST
L-01 48TH, SALEM ST
L-11 41ST AND ADELINE, 41ST ST
18 19
20 21
22 23
24 25
26 27
28 PAVEMENT LAYOUT SHEET - 2
PAVEMENT LAYOUT SHEET - 3
PAVEMENT LAYOUT SHEET - 4
PAVEMENT LAYOUT SHEET - 5
PAVEMENT LAYOUT SHEET - 6
PAVEMENT LAYOUT SHEET - 7
PAVEMENT LAYOUT SHEET - 8
PAVEMENT LAYOUT SHEET - 9
PAVEMENT LAYOUT SHEET - 10
PAVEMENT LAYOUT SHEET - 11
MAY 26, 2022
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 * R1-1 * "RIGHT TURN * ONLY" * S1-1 * S4-3P * R30 (CA) * "NO PARKING" LOCAL SIGN * R30 (CA) * "PERMIT PARKING" LOCAL SIGN * R99 (CA) * "NO PARKING LOADING ZONE" * R30 (CA) * "NO PARKING LOADING ZONE" * "NO PARKING LOADING ZONE" * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * "PERMIT PARKING" LOCAL SIGN * R30 (CA) * "PERMIT PARKING" LOCAL SIGN * R30 (CA) * "PERMIT PARKING" LOCAL SIGN * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * S1-1 * S4-3P * LOCAL SIGN * YELLOW SPEED REGULATORY SIGN * R30 (CA) * R2-1 (25) * R30 (CA) * NOPARKING LOADING ZONE SIGNS * LOCAL GUIDE SIGN * R1-1 * R6-5p (MOD) * NO PARKING LOCAL SIGN * R30 (CA) * R30 (CA)* R1-1 * R6-5p (MOD)* "WARNING DRUG FREE SCHOOL ZONE" SIGN * R30 (CA) * SNS * R36 (CA) (MOD) * R30 (CA) * R99 (CA) * YELLOW SPEED REGULATORY SIGN * S1-1 * S4-3P * R1-1 * R30 (CA) * R30 (CA) * R1-1 * R30 (CA) * R30 (CA) * R30 (CA) * NOPARKING LOADING * R1-1 SIGN * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R1-1 * S1-1 * S4-3P * R30 (CA) * R30 (CA) * R30 (CA) * R99 (CA) * R30 (CA) * R1-1 * R30 (CA) * R30 (CA) * R30 (CA) * R1-1 * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R1-1 * "STREET CLOSED AT SALEM" * R36 (CA) (MOD) * LOCAL GUIDE SIGN * R30 (CA) * R30 (CA) * R99 (CA) * R6-5p (MOD) * R1-1 * LOCAL GUIDE SIGNAGE * R30 (CA) * R1-1 * R6-5p (MOD) * R99 (CA) * "BICYCLE BOULEVARD SIGN" * R30 (CA) * R30 (CA) * R1-1 * PUSH BUTTON * R36 (CA) (MOD) * LOCAL BIKE SIGN * R30 (CA) * R99 (CA) * R30 (CA) * R1-1 * LOCAL BIKE SIGN * R30 (CA) * R30 (CA)* R1-1 * R30 (CA) * R30 (CA) * SNS * R1-1* R36 (CA) (MOD) * W17-1 * R30 (CA) * W17-1 * R30 (CA) * R30 (CA) * W17-1 * R30 (CA) * W17-1 * R30 (CA) * R30 (CA) * R1-1 * R3-5(R) * SW52 * "BIKE OK" * R3-5(L) * R30 (CA) * R30 (CA) * W14-2 (CA) * R30 (CA) * W14-2 (CA) * SW52 (CA) * W14-2 (CA) * "BIKE OK" * W17-1 * R99 (CA) * R30(CA) * W17-1 * R30 (CA) * R30 (CA) * R30 (CA) * W17-1 * W17-1 * R30 (CA) * R30 (CA) * SNS * R1-1 * W14-2 (CA) * R30 (CA) * R30 (CA) * R1-1 * R30 (CA) * R30 (CA) * R30 (CA) * CANNOT IDENTIFY SIGN * R1-1 * R30 (CA) * R30 (CA) * R1-1 * R36 (CA) (MOD) * R30 (CA) * R30 (CA) * "15 MPH" * R1-1 * R30 (CA) * R30 (CA) * "15 MPH" * R99 (CA) * R30 (CA) * "RIGHT TURN ONLY" * R1-1 * R30A (CA) * R30A (CA) * R2-1 (15) * R4-7a * W14-1 * UNKNOWN SIGN * R1-1 * R26 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * S1-1 * S4-3P * "15 MPH" * R26 (CA) * R26 (CA) * R26 (CA) * R26 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * SNS * R1-1 * SNS * R6-1 * "NO RIGHT TURN * SNS * R28 (CA) * * SNS * R4-1 * R2-1 (30) * R1-1 * R1-1 * SNS * R1-1 * R1-1 * SNS * S1-1 * SNS * "AFTER STOP RIGHT TURN PERMITTED ON RED" * R1-1 * R1-1 * R2-1 * R1-6 * R30 (CA) BLVD BLVD BLVD BLVD STOP STOPSTOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP STOP BLVD BLVD BLVD BLVD XING SCHOOL SLOW SCHOOL XING SCHOOL SLOW XING SCHOOL SLOW XING SCHOOL SLOW XING SCHOOL SLOW STOP BLVD BLVD STOP SHARE THE PATH BUMP BUMP SHARE THE PATH SHARE THE PATH SHARE THE PATH SHARE THE PATH STOP STOP STOP BUMP BUMP STOP STOP STOP STOP STOP STOP STOP SHARE THE PATH THE PATH SHARE SHARE THE PATH THE PATH SHARE SHARE THE PATH THE PATH SHARE SHARE THE PATH THE PATH SHARE XING SLOW DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

PREFORM VIZIGRIP-GREEN

CONCRETE

SHARED PAVEMENT MARKING

INSTALL NEW OR RELOCATED SIGN ON NEW POST

EXISTING SIGN ON EXISTING POST

BIKE SYMBOLS WITH (PREFORM VIZIGRIP)
K72 MARKER POST

ELECTROLIER - SINGLE ARM

EXISTING HYDRANT

EXISTING PAVEMENT MARKING

PROPOSED PAVEMENT MARKING BLVDBIKE BLVD PAVEMENT MARKING

INSTALL NEW SIGN PANEL ON EXISTING POST

REMOVE EXISTING SIGN PANEL

REMOVE EXISTING SIGN & POST

NEW SIGN PANEL ON NEW POLE
_ _ _ _ DETAILS & CALTRANS STRIPING & MARKING DETAILS
BLVD
BLVD
SSC
HDC
HDA
PM

SIGN POST INSTALLATION

BICYCLE BOULEVARD MARKING

SLOTTED SPEED CUSHION
HATCH DETAIL @ CORNER
HATCH DETAIL @ APPROACH

PAVEMENT MARKINGS
S1
GB1
GB2
CW
CWSM

GREEN BIKE LANE SHARROW

CONFLICT ZONE GREEN BIKE LANE

GREEN BIKE LANE

CONTINENTAL CROSSWALK

STOP BAR & MARKING WITH CROSSWALK
♦
▼
●
▲
■

RELOCATE SIGN PANEL
LL INSTALL 12" WHITE LINE

EXISTING RAMPS
CWSM
22 LL
22 39
39 XX-XX
A
BL INSTALL 4" WHITE STRIPE

PARKING LOSS LOCATIONS

SPEED HUMP
YL INSTALL 6" YELLOW STRIPE
W8-1
W13-1P "15"
23' RED CURB

FROM HERE

DIRECTION OF TRAVEL

DRIVE WAY OR PARKING CLOSED

ALIGN CROSSWALK

GAPS TO WHEEL PATH
◘ INSTALL NEW SIGN PANEL ON EXISTING POLE (SSBM)

PLANTERS
METHYL METHACRYLATE (MMA) "TAN"

EXISTING LOOP DETECTOR

RELOCATE SIGN PANEL TO NEW POLE/SSBM

EXISTING FACE OF CURB

ELECTROLIER - DOUBLE ARM
22 21
2 DIRECTIONAL DRIVE WAY ENTRY / EXIT
1 DIRECTIONAL DRIVE WAY ENTRY / EXIT

WHITE FLEXIBLE MOUNT DELINEATOR
SIGN POST INSTALLATION NOTES:

1. POSTS SHALL BE TELESPAR OR APPROVED EQUAL PERFORATED 4" SQUARE, FOURTEEN (14) GAUGE STEEL POSTS AND MINIMUM 10 FEET IN LENGTH. POSTS

SHALL BE MANUFACTURED FROM HOT-DIPPED GALVANIZED STEEL CONFORMING TO ASTM A 653, G-90, STRUCTURAL QUALITY,L CLASS 1. THE CORNER WELD SHALL BE ZINC COATED AFTER SCARFING OPERATION. THE POST SHALL ALSO BE COATED

WITH A CHROMATE CONVERSION COATING AND CLEAR ORGANIC POLYMER TOPCOAT. BOTH THE INTERIOR AND THE EXTERIOR OF THE POST SHALL BE GALVANIZED. POST SHALL BE HUNTER GREEN POWDER COATING COLOR.

2. ANCHORS SHALL BE TELESPAR OR APPROVED EQUAL PERFORATED 2" SQUARE, TWELVE (12) GAUGE HOT-DIPPED GALVANIZED STEEL ANCHORS. A

TWO-PIECE BREAKAWAY ANCHOR SYSTEM (ANCHOR ASSEMBLY) SHALL BE USED BY WELDING AN EIGHTEEN INCH (18") LONG,TWELVE (12) GAUGE OUTER SLEEVE OF THE NEXT LARGER SIZE PERFORATED TUBE TO THE ORIGINAL 2" SQUARE PERFORATED ANCHOR BASE.

3. THE CONTRACTOR IS RESPONSIBLE TO CAREFULLY REMOVE ANY SIGNS

FROM THE POSTS, REMOVE POSTS FROM THE GROUND WITHOUT CUTTING,

CAREFULLY REMOVE ANY CONCRETE FROM THE POSTS, REPAIR THE POST HOLE,

BIND THE POSTS, COORDINATE WITH THE ENGINEER FOR TRANSPORTATION TO

CITY CORPORATION YARD AND TRANSPORT SIGNS AND POSTS TO THE LOCATION DETERMINED BY THE ENGINEER WITHOUT DAMAGE.

INSTALL NEW OR RELOCATED SIGN PANEL ON

EXISTING LIGHTING OR SIGNAL POLE BY SSBM

BLACK INTERLOCKING SPEED CUSHION

WITH WHITE DOUBLE CHEVRON

ARROWS AND OUTSIDE STRIPING
(TRAFFIC LOGIX OR APPROVED EQUAL)
OR
1 SLOTTED SPEED CUSHION SCALE: NTS 2 BICYCLE BOULEVARD MARKING SCALE: NTS SSC
3 STOP BAR & MARKING WITH CROSSWALK SCALE: NTS
5 SIGN POST INSTALLATION SCALE: NTS
LEGEND:
8'
PARKING 10' RED CURB
6' TYP 4'
VARIES
10' (VARIES) 6' 10' (VARIES)
36'
8'

PARKING
4' 2' 4'
8'

PLAN VIEW

SECTION A-A

SECTION B-B
4' 2' 4'
B
A A
B
W8-1
W13-1P "15"
K72 MARKER POST

OR APPROVED EQUAL
(TYP.) 10' RED CURB 23' RED CURB 3" 3" 3"
NOTE:

INSTALL PER MANUFACTURER'S INSTRUCTIONS
6' X 7' SPEED

CUSHION (TYP)
7' 75.5" 40" 53" 40" 139"
12" 72"

ALIGN CONTINENTAL CROSSWALK

WITH RAMP & PERPENDICULAR TO

DIRECTION OF TRAVEL
8' TYP
5' TYP
12' TYP
2'-6"
8"
7' MI N
SIGN

CLEARANCE
FC
18"
BW
2"
2"
4' MIN
SIGN
POST (SEE NOTE 1)
ANCHOR
(SEE NOTE 2)
CURB
CLASS "B"

CONCRETE
EX. SIDEWALK
* EXISTING POLE & SIGN PANEL TO BE RETAINED
4 CONTINENTAL CROSSWALK CW SCALE: NTS
11'
(OR AS PER PLAN) 2' TYP. 2' TYP.
11'
(OR AS PER PLAN) 2' TYP. 2' TYP.

PAINT CROSSWALK YELLOW
IF WITHIN 500' OF SCHOOL
YL1 INSTALL 4" YELLOW STRIPE
11'
(OR AS PER PLAN) 2' TYP. 2' TYP. TRAVEL LANE BIKE LANE

PREFORMED

GREEN THERMO
PLASTIC (TYP.)
GB
1'
5'
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

TRAVEL LANE
4'-0" 8'-0"
(TYP) (TYP)
DETAIL 39A (TYP.) VARIES

TRAVEL LANE
TRAVEL LANE DETAIL 39A (TYP.)

BIKE LANE

PREFORMED

GREEN THERMO
PLASTIC (TYP.) 5' TYP. (OR AS PER PLAN) VARIES (AS PER PLAN)

TRAVEL LANE

TRAVEL LANE
DETAIL 39 PER PLAN (TYP.)

BIKE LANE
DETAIL NOTE:

BIKE LANE BUFFER

TYPE PER PLAN
12'-0"
(TYP)
8' - 0" 6'-0"
12'-0"

WHITE PREFORMED THERMOPLASTIC

SHARROW PAVEMENT MARKING
10'-0" 10'-0"
8' - 6" 19' 0" SEE PLAN

TRAVEL LANE

EXISTING FACE OF CURB
39 39A
BL
14 GREEN BIKE LANE SHARROW S1 SCALE: NTS
8 GREEN BIKE LANE WITH BIKE BUFFER SCALE: NTS
12 BIKE LANE BUFFER DETAILS
SCALE: NTS
6 CONFLICT ZONE GREEN BIKE LANE SCALE: NTS 16' SEE PLAN 5' TYP.
(OR AS PER PLAN)
VARIES
6' MAX

DIRECTION OF TRAVEL
12' O.C. @ 45° STOP
LL
16 SEPARATE BIKE WAY INTERSECTION APPROACH SCALE: NTS
15 ANGLED PARKING DETAIL SCALE: NTS
SBIA
BL
BL
GB
BL
PM
BL
39 FD
KP

EXISTING FACE

OF CURB/ISLAND
FD
12' 0"
12' 0"
5'
4'
4'-0" 8'-0"
(TYP) (TYP)
DETAIL 39A (TYP.) 5' TYP. (OR AS PER PLAN) TRAVEL LANE
4" THICK DASHED

YELLOW CENTERLINE

PREFORMED

GREEN THERMO
PLASTIC (TYP.)
39A
7 CONFLICT ZONE TWO-WAY GREEN BIKE LANE GB1 SCALE: NTS

BIKE LANE

TRAVEL LANE
BIKE LANE 5' TYP. (OR AS PER PLAN)
TRAVEL LANE 5' TYP. (OR AS PER PLAN) VARIES
(AS PER PLAN)
VARIES
(AS PER PLAN)

PREFORMED GREEN
THERMOPLASTIC (TYP.)

PROPOSED CONCRETE ISLAND VARIES (AS PER PLAN)

EXISTING STORM WATER

ISLAND/PLANTER AREA VARIES (AS PER PLAN)
3' TYP.
(OR AS PER PLAN)
VARIES
(AS PER PLAN)
VARIES
(AS PER PLAN)
4' TYP.
(OR AS PER PLAN)

KP VARIES (AS PER PLAN)
DETAIL 39A PER PLAN (TYP.)
VARIES
VARIES
(AS PER PLAN)
3' TYP.

PREFORMED VIZIGRIP

GREEN BACK

BIKE LANE

FACE OF CURB
8'-0" 4'-0" EDGE OF DRIVEWAY
8'-0" 4'-0" VARIES VARIES EDGE OF DRIVEWAY EDGE OF DRIVEWAY EDGE OF DRIVEWAY 5' TYP. (OR AS PER PLAN) VARIES

FACE OF CURB
DIAGONAL 4" WHITE BUFFER STRIPING
12'-0"

DELINEATOR SHALL BE INSTALLED IN
GROUP OF 12' O.C. AS SHOWN IN PLAN VARIES VARIES
10 BIKEWAY BUFFER DELINEATOR PLACEMENT AT TYPE "B" DRIVEWAY APPROACHES SCALE: NTS 11 BIKEWAY BUFFER & DELINEATOR PLACEMENT AT DRIVEWAY APPROACHES SCALE: NTS 9 TYPICAL DELINEATOR PLACEMENT AND SPACING ON BIKEWAY BUFFERS SCALE: NTS 12'-0"
12'-0"
39 BL
39 BL
39 BL
BDTB
BDA
R-5' TYP.
(OR AS PER PLAN) KP 5' TYP. (OR AS PER PLAN)
FD
KP
R-5' TYP.
(OR AS PER PLAN) FD 5' TYP. (OR AS PER PLAN) VARIES (AS PER PLAN)

EXISTING FACE

OF CURB OR BIKE LANE
(AS PER PLAN)
13 LOADING ZONE DETAIL SCALE: NTS 1'
VARIES
(AS PER PLAN)
BL 12'-0"
1' THICK YELLOW

LOADING ZONE MARKING
LZ 1'
1'
1'
1' THICK YELLOW

LOADING ZONE MARKING
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 8' TYP 7' MIN
20'
TYP
22'
TYP
18' MIN 20' MIN

EXISTING FACE

OF CURB
21 PARKING TIPS DETAIL SCALE: NTS 1'
22 WHITE FLEXIBLE MOUNT DELINEATOR SCALE: NTS 30"
FD
STOP

ONLY STOP
NOTE :- REFER TO CALTRANS STANDARD
PLANS IF REQUIRED.

LINK: https://dot.ca.gov/-/media/dot-media/programs/
design/documents/2018-std-plns-for-web-a11y.pdf
XING
SLOW

SCHOOL BUMP
19 K72 MARKER POST SCALE: NTS
GREY
KP
8' 36'
12'
NOTE :- MARKINGS TO BE PAINTED IN YELLOW
COLOR IF WITHIN 500FT FROM SCHOOL.
17 PAVEMENT MARKINGS PM SCALE: NTS
18 PAVEMENT MARKINGS - BIKE PM SCALE: NTS
20 PROPOSED SIGNAGE CHART SCALE: NTS
20'
(TYP) MIN 4' (OR AS PER PLAN)
5'
(TYP)
6'
(TYP)
6'
(TYP)

PREFORMED GREEN
THERMO PLASTIC (TYP.)

TRAVEL LANE

BIKE LANE

WHITE THERMO
PLASTIC (TYP.)
SHARE
THE PATH 1"
1"
3' 3'

PREFORMED YELLOW
THERMOPLASTIC (TYP.)

PREFORMED WHITE
THERMOPLASTIC (TYP.)
23 BIKE PED SHARE PATH DETAIL BPS SCALE: NTS
24 BIKE WITH ARROW ON GREEN BASE BPS SCALE: NTS
W84 (CA) W8-1 W13-1P"15" R1-1 W11-15 R2-1"15"
W11-15P
S1-1 W16-7P W11-2 R5-1 R10-15MOD-A R10-15MOD-B
R25A (CA) R6-5P
R9-5 R81A(CA) R81B(CA)
NOTE : All BIKE MARKINGS ARE PREFORM
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 STOP
CALTRANS A87A
A1-1 CURB

VARIES PER PLAN
25 PROTECTED CORNER SCALE: NTS
RAISED PAVEMENT 1"

RP DGAC
GB

CW CROSSWALK

ANGLE PER PLAN VARIES PER PLAN
KP

MARKING VARY PER PLAN
6'
BPS 6"
CALTRANS A87A
A1-1 CURB
6" 1"

WIDTH VARIES PER PLAN
2:1 SLOPE
2"
26 RAISED PAVEMENT 1" RP SCALE: NTS
RAISED PAVEMENT 1"
DGAC

SCORE EXISTING PAVEMENT
RP
A-A

SECTION A-A
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 SLR
SLR 27' 27'
32'
36' 27' 27'

TO EXISTING

PAVING SEAM TO EXISTING

PAVING SEAM
SLR
27' 27'

TO EXISTING

PAVING SEAM
54'
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 36' SLR
RP
DIG
6C
4C
6CG
RAMP
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR

RAMP CASE C
33' 26'

TO EXISTING

PAVING SEAM

10.5'

17.5' 7.5' 34' 45'
34'
28'

TO EXISTING

PAVING SEAM
SLR
9'
6' 5' 5.0'
crosoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS RAMP CASE C

10.5'

17.5' 7.5' 5.0'
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR
4C
6CG
6CG

RAMP CASE A

RAMP CASE C
DIG
DIG
45'
52'
40'
15' 11' 20'

17.5' 7' 6'

1.0' 1.0'

6.5'

3.0'

6.0' 3.5'
R3.5' 3.0' 9.0' 6.5' 4.0' 4.0'
249.0' 4.0'

14.5' 13.5'
R2.0'

5.0' 16.0' 12.5'

17.5' 13.0'

2.5' 15.0' 2' 2' 2' 3.0' 2.0'

12.0' 11' 11.0'

9.5' 6.0' 6.5' 3.0' 2.5'

4.0' 7.5'

3.5' 3.5' 6.5'

15.0'

5.5' 6.5' 28' 37' 37'

RAMP CASE A
SLR 37' 37' 44' 37' 31'
4C
6CG
6CG

RAMP CASE A

RAMP CASE C
DIG
DIG

15.5' 3.5' R6.5'
R4.5'

17.5' 7.5'

3.0' 2.0' R6.5'

1.0'

6.5'

3.0' 9.5' 4.0' 4.0'
249.0' 4.0'

8.0' 7.5'

14.5' 13.5' 4.5'

12.0' 11.0'
R2.0'
R5.0'

16.0' 9.0' 3.5' 6.5'

5.0' 12.5' 10.0'

17.5' 13.0'

1.0'

2.5' 15.0' 3.0' 2.0'

15.0'

RAMP CASE A
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DIG
SLR

SLR SLR
4C
RAMP CASE A 6C
RAMP CASE A 57' 44' 48' 46' 3.0' 2.0' 21.0' 7.5' 5.5' 7.0' 3.5' 6.0'

2.0' 4.0' R2.0' 2.0' 5.5' 1.5' R2.0' R20.0' 6.0' 18.0' 3.0' 4.0'

5.5' R4.0'
R1.0'

TO EXISTING

PAVING SEAM
R1.0'
R1.0' 3.0'4.5' R1.0' 5.5' 3.0' 10.0' 4.0' 4.0' 2.0' R1.0' 11.5'

17.5'

6.5'4.0'3.5'
TOP SOIL 10.0' 11.5' 3.5'6.5'4.0' 13.5'

TO EXISTING

PAVING SEAM
DIG
SLR 48' 48' 48' 48'

PAVING SEAM
DIG
4C
RAMP CASE A 6C
RAMP CASE A 17.5' 12.5' 10.0' 10.0'

17.5' 12.5' 5.5' 2.5' 3.0' 2.0' 2.5' 4.0' 5.5' 1.5'

7.0' 5.5' 5.0' 19.5'

5.0' 9.0' 1.5' 12.5' 8.0'

5.0'21.0' 2.0'

5.0' 5.0' 6.0' 2.0' R5.0'

1.5' 13.5' 10.0' 1.5' 9.0' 4.0'

6.0' R3.0' R3.0' 2.0' 1.5' 6.0' 2.0' 1.5' 1.5' 2.0' 2.0' DIG
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR
RP
6C
RP
6C
RP 48.0' 29.0'

10.0'

2.5'

13.0'

3.0'

12.0'

7.5' 2.5'
R0.5'
R0.5'

24.5' 2.0'

0.5'

12.0'
R0.5' R0.5'

7.5' 4.5'

4.0'

14.5'
R0.5'

14.0'2.0'
R0.5'

7.0' 7.5'

4.5'

4.5'
R0.5'

55.0'

55.0'
2483.5'

TO THE EDGE OF

DRIVEWAY
6C
6C

8.5'

8.0'

7.0'
R23.5'

26.0'

4.0'
R18.0'
R14.0'

5.5'

16.5' R30.0'

14.0' 5.0'

4.5'

10.0'

11.0'

7.5'

15.5'

4.0' 16.5' 4.0'

4.0'

4.0' 0.5'

4.0'0.5'

2.0'

TO THE EDGE

OF DRIVEWAY
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR

TO EXISTING
PAVING SEAM 48' 45' 44' 48'
33'
SLR
SLR 48'40' 46' 48' 40'48'
34'

TO EXISTING

PAVING SEAM
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 202 SLR
RP
6C
RP
6C CVR MH DIGCS 31.5' 38.0' 3.0' 5.5' 4.5' 16.0' 48.0' R0.5' 48'39' 48' 54' 37'44' 1.5'15.5' 15.0' 3.0' 4.0' 24.5'24.0' R0.5' 2.0' 12.0' 17.5'

TO THE EDGE OF

CROSSWALK
6C
6C 6.0' 4.0'19.5' 16.0' 7.5' 27.5' 18.5' 3.5' 23.0' 4.0' 14.5' 4.0' 15.5' 4.0' 0.5' 4.5' 6.0' 4.0' 14.0' 35.0' 15.5' 5.0' 39.0' 49.0' 7.0' 4.0' 2.0'

TO THE EDGE OF

CROSSWALK
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR 33' 34' 36' 36' © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR 34' 36'
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR SLR SLR 48' 48' 37'48'
33'

TO EXISTING

PAVEMENT SEAM

TO EXISTING

PAVEMENT SEAM
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR
SLR
6CG
RP
6C 48'

TO THE EDGE OF

DRIVEWAY

TO THE EDGE OF

DRIVEWAY

TO EXISTING
PAVEMENT SEAM 48' 40'
32' 14'2'

6.0'

13.5' 20.5'
R0.5' 10.0' 14.0'

10.0'

3.5'
R0.5'

13.0'

14.5' 15.0'2.0'

5.0' 0.5'

10.5'

36.0'
50' FROM THE EDGE

OF TRAVEL LANE

47.0'

56.0'

56.0'

50.0'
2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 6CG 6C

4.5'

16.5'

4.0'

19.0'

4.0' 3.0'

7.0'

16.0' 22.0'

10.5' 3.0'

9.5'

17.5'

26.5' 6.0'

1.0' 14.0'

3.0'
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 on © 2022 Maxar ©CNES (2022) Distribution
SLR

RAMP CASE A

TO EXISTING

PAVEMENT SEAM

7.0' 6.0'

8.5'

3.5'

6.0' 8.0'

1.5'

17.5'

3.5'

2.0' 47' 46'
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distr 022 Maxar ©CNES (2022) Distribution Airbus DS on © 2022 Maxar ©CNES (2022) Distribution Airbus DS SLR
RP
6C
6C

RAMP CASE A
DIG

TO THE EDGE

OF DRIVEWAY

TO THE EDGE
OF DRIVEWAY 48'38' 48'
54'
46'
34' 12.0'

4.0'

6.5' 6.5' 29.5' 2.0'2.0'

0.5'34.0'
R1.5' 10.5' 28.0' 2.0'

0.5'30.5'

2.5'
R0.5'

7.0' 4.0' R2.5'
R12.5' 13.5'

14.0'

5.0'

20.5'

2.0'

0.5'

4.0' 14.0'5.0'

2.5' 3.0' 9.5'
R0.5'
R0.5'

8.0'
R6.0'

3.5'11.5'
R0.5'

5.0'

6.0' 1.5'

24.0'

4.0' 26.0'
63' FROM THE

EDGE OF TRAVEL WAY
63'
56'
6C
6C

RAMP CASE A
DIG 12.5' 17.5'2.5' 34.5'

1.0' 1.0'

1.5' R3.0' R2.0'
R1.5'

1.0'

12.0' 8.0'
R13.5'

15.5'

12.0'

7.5' 13.0' 4.0'

4.0'

2.5' 22.5' 2.0' 8.5' 11.5'

37.0'

11.0'4.0'

41.0'

12.0' 30.0'

14.0'

5.5'

11.0' R7.0'

15.5' 4.0' 9.0'

4.0'

26.5'

8.0' 1.5' 6.0'

7.0'

30.0'

6.0'
R13.5'
RAMP CASE A 8.0'

6.0' 7.0' 2.5'

2.5'

20.0'
CVR
MH
DIG
CS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 * R1-1
* R30 (CA) * CANNOT

IDENTIFY
SIGN * R1-1
* R30 (CA) * R30 (CA)
* "15 MPH" * R1-1
* R30 (CA) * R30 (CA) * "15 MPH" * R99 (CA)
* "RIGHT TURN ONLY" * R30 (CA) * R1-1
* R1-1
* R30 (CA) * CANNOT

IDENTIFY
SIGN * R1-1
* R30 (CA) * R30 (CA)
* "15 MPH" * R1-1
* R30 (CA) * R30 (CA) * "15 MPH" * R99 (CA)
* "RIGHT TURN ONLY" * R30 (CA) * R1-1 STOP

STOP STOP STOP
22 22
PM
LL
CW
30' 30' 11' 30'
30'
* R1-1
* R36 (CA) (MOD) * R30 (CA)
* R30 (CA)
* R1-1
* R36 (CA) (MOD) * R30 (CA)
* R30 (CA)
STOP

BUMP BUMP
22 PM
LL
01-02
♦ W8-1
♦ W13-1P "15"
01-03
♦ W8-1
♦ W13-1P "15"
01-04
01-01
♦ W84
♦ W84
PM
PM
SSC
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA)
R30 (CA) * R30 (CA)
* R30 (CA)
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA)
R30 (CA) * R30 (CA)
* R30 (CA)
STOP
22 PM
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R1-1 * R26 (CA)
* R26 (CA) * R26 (CA) * R26 (CA) * R30 (CA)
* R30 (CA)
* SNS
* R1-1 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R1-1 * R26 (CA)
* R26 (CA) * R26 (CA) * R26 (CA) * R30 (CA)
* R30 (CA)
* SNS
* R1-1 SHARE THE PATH
CW
27B
22 SB2
PM
LL
27B
39 22
PM
FD
KP
BPS
22 27B
BL
39 22
BL
PM
02-04
♦ R2-1 "15"
02-03
♦ W11-15
02-02
R1-1
52' 11'
29'
14'
17'
26'
23'
20'
53' 52'
49' 50'
37'
11' 11'
8' 10' 10'
2' 15'
7'
11' 11' 10' 10'
18' 11'
10'
17'
17'
67'
5'
3'
4' 1'
28' 20'
FD
FD
8' 25' 25' 25' 314'
128'
02-02
R1-1
SNS
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R2-1 (15) * R4-7a * W14-1 * UNKNOWN SIGN * R26 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * S1-1 * S4-3P * "15 MPH" * R30 (CA) © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R2-1 (15) * R4-7a * W14-1 * UNKNOWN SIGN * R26 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * S1-1 * S4-3P * "15 MPH" * R30 (CA) SLOW SCHOOL XING SHARE THE PATH BUMP BUMP SHARE THE PATH SHARE

THE PATH SHARE
THE PATH ■ KP
22 22
PM
CW
BPS
BM
22 YL1
22 39
22 BPS
FD
BL
BL
BL
39A
GB1
KP
03-03 ♦ W2-1 "15"
03-01 ♦ W11-15P
03-02
W11-15P
03-06 ♦ S1-1 ♦ W16-7P
03-05 ♦ S1-1 ♦ W16-7P
W84 (CA)
03-04 ■
10' 10' 17'
15' 2'
11'
6' 23' 9' 81' 17' 77' 40' 8.5' 10' 8'
15'
16'
30' ▲ 16'
SSC 52' 74'
133'
112'
30' 15' 2' * R30A (CA) XINGBUMP BL
BL
PM
39 BL
03-07 ♦ W84(CA)
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 * R1-1 * R3-5(R) * SW52 * "BIKE OK" * R3-5(L) * R30 (CA) * R30 (CA) * W14-2 (CA) * R30 (CA) * W14-2 (CA) * SW52 (CA) * W14-2 (CA) * "BIKE OK" * W14-2 (CA) * R1-1 * R3-5(R) * SW52 * "BIKE OK" * R3-5(L) * R30 (CA) * R30 (CA) * W14-2 (CA) * R30 (CA) * W14-2 (CA) * SW52 (CA) * W14-2 (CA) * "BIKE OK" * W14-2 (CA) BLVD BLVD BLVD BLVD STOP

STOP SCHOOL SLOW
PM
39 22
PM
FD
39 39
PM
39 CW
BL
PM
LL
KP
04-01 ♦ W11-2 ♦ W16-7P
04-02 ♦ W11-2 ♦ W16-7P
11' 11' 15' 10'
10' 8' 11'
32' 24' 25' 36'
04-07 ♦ R5-1
04-06 ♦ R5-1 ■
BLVD
CW 14' 16' 4' 14' 6'
04-03 ♦ R25A(CA)
04-04 ♦ R25A(CA)
04-05 ■ R25A(CA)
25' 293'
283'
100'
40' * R30 (CA) * R30 (CA) * W17-1 * R30 (CA) * W17-1 R1-1 * R30 (CA) R3-5(R) * W17-1 * R99 (CA) * R30(CA) * W17-1 * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * W17-1 * R30 (CA) * W17-1 R1-1 * R30 (CA)R3-5(R) * W17-1 * R99 (CA) * R30(CA) * W17-1 * R30 (CA) * R30 (CA) * R30 (CA) STOP 22 39 39
39 39
CM 8' 6' 11' 11' 6' 8'
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * "STREET CLOSED AT SALEM" * R36 (CA) (MOD) * W17-1
* R30 (CA) * W17-1
* R30 (CA)
R30 (CA)
R30 (CA) * W17-1 * W17-1 * R30 (CA) * R30 (CA) * SNS
* R1-1
* R1-1
* R1-1
* R2-1
* R1-6
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * "STREET CLOSED AT SALEM" * R36 (CA) (MOD) * W17-1
* R30 (CA) * W17-1
* R30 (CA)
R30 (CA)
R30 (CA) * W17-1 * W17-1 * R30 (CA) * R30 (CA) * SNS
* R1-1
* R1-1
* R1-1
* R2-1
* R1-6 STOP
STOP
STOP
CM
22 39
39 39
39 BM
BM
39A
DG
KP 8' 6' 11' 11' 6' 8'
1'
11'
11'
9'
5' 2'
11'
10'
6' 5'
11'
6'
13'

10.5' 5'
9'
11'
05-02
05-03
05-01
♦ R10-15MOD-B-R
♦ R25A(CA)
♦ R25A(CA)
05-04
♦ R10-15MOD-B-L
LZ

2.5'5'

10.5' 7.0' 5.0'

10.5'

9.0'

7.0'

4.0'

4.0' 22' 10.5' 2.0' 5.0'
44'
YL1
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R1-1 * LOCAL GUIDE
SIGNAGE * R30 (CA) * R1-1 * R6-5p (MOD) * R99 (CA) * "BICYCLE BOULEVARD SIGN" * R30 (CA) * R30 (CA) * R1-1 * PUSH
BUTTON * R36 (CA) (MOD) * LOCAL BIKE
SIGN * R30 (CA) * R99 (CA) * R30 (CA) * R1-1 * LOCAL BIKE SIGN * R30 (CA) © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R1-1 * LOCAL GUIDE
SIGNAGE * R30 (CA) * R1-1 * R6-5p (MOD) * R99 (CA) * "BICYCLE BOULEVARD SIGN" * R30 (CA) * R30 (CA) * R1-1 * PUSH
BUTTON * R36 (CA) (MOD) * LOCAL BIKE
SIGN * R30 (CA) * R99 (CA) * R30 (CA) * R1-1 * LOCAL BIKE SIGN * R30 (CA) STOP

STOP STOP BLVD BLVD BLVD SLOW SCHOOL XING SCHOOLSTOP XING SLOW 39 22
PM
BLVD
LL
39 KP
22 CW
CW
22 11'
28' 11' 13' 11.5' 11' 13'
06-07 ▲ ■ R6-5P
06-08
06-09 ■ R6-5P ■ R6-5P
BLVD
06-01
06-02
06-03 * R1-1 * R99 (CA) * R30 (CA) * R6-5p (MOD) * R1-1 * R30 (CA)* R1-1 * R30 (CA) * R1-1 * R99 (CA) * R30 (CA) * R6-5p (MOD) * R1-1 * R30 (CA)* R1-1 * R30 (CA) STOP

STOP STOP BLVD BLVD SLOW
22 39
22 39
PM
CW
CW
LL
11' 11' 13' 11.5' 11' 13' 14' 11.0' 10' ▲ 13'
06-10 ■ R6-5P
06-12
R6-5P
06-11 ■ R6-5P ■
BLVD
BLVD
06-04 06-05 06-06
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * LOCAL GUIDE SIGN * R30 (CA) * R30 (CA) * SNS * R1-1* R36 (CA) (MOD) © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * LOCAL GUIDE SIGN * R30 (CA) * R30 (CA) * SNS * R1-1* R36 (CA) (MOD) BLVD STOP 39 22
39 PM
39 39A
DG
KP
22 39
39 BL
22 14' 11.0' 10' 13' 11.0' 6' 11' 10.5' 6'
07-03 ♦ R10-15MOD-B-R
07-02 ■ R10-15MOD-B-L
07-01 ♦ R10-15MOD-B-R
39A

10.5' 5.0' 10.5' 5.0' 10.5' 13.0' 10.5' 15.0' 22' 10.5' 2.0' 5.0' DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * S1-1 * S4-3P * R30 (CA) * R30 (CA) * R30 (CA) * R99 (CA) * R30 (CA) * 2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * S1-1 * S4-3P * R30 (CA) * R30 (CA) * R30 (CA) * R99 (CA) * R30 (CA) * STOP STOP © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) STOP STOP DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * S1-1 * S4-3P
* LOCAL
SIGN
* YELLOW
SPEED

REGULATORY
SIGN
* R30 (CA) * R2-1 (25) * R30 (CA) * NO

PARKING

LOADING
ZONE
SIGNS
* LOCAL
GUIDE
SIGN
* R1-1
* R6-5p (MOD)
* NO PARKING

LOCAL SIGN
* R30 (CA)
* R30 (CA) * R1-1
* R30 (CA) * R30 (CA) * R30 (CA) * NO

PARKING

LOADING
SIGN
* R1-1
* R1-1
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * S1-1 * S4-3P
* LOCAL
SIGN
* YELLOW
SPEED

REGULATORY
SIGN
* R30 (CA) * R2-1 (25) * R30 (CA) * NO

PARKING

LOADING
ZONE
SIGNS
* LOCAL
GUIDE
SIGN
* R1-1
* R6-5p (MOD)
* NO PARKING

LOCAL SIGN
* R30 (CA)
* R30 (CA) * R1-1
* R30 (CA) * R30 (CA) * R30 (CA) * NO

PARKING

LOADING
SIGN
* R1-1
* R1-1 STOP
STOP STOPSLOW SCHOOL XING XING SCHOOL STOP 39
22 PM
LL
22 CW 22
CM
22 KP
39 39
39 13' 10.5' 12' 13' 11'
11'
09-04
■ R6-5P
09-05
■ R6-5P
09-06
■ R6-5P
▲
09-01
09-02
09-03
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA)* R1-1
* R6-5p (MOD)
* "WARNING DRUG FREE
SCHOOL ZONE" SIGN
* R30 (CA)
* SNS
* R36 (CA) (MOD) * R30 (CA) * R99 (CA) * YELLOW SPEED

REGULATORY
SIGN
* S1-1
* S4-3P
* R1-1 * R30 (CA)
* R30 (CA)
* R30 (CA)
* R1-1
* S1-1
* SNS
* "AFTER STOP RIGHT

TURN PERMITTED ON
RED"
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS * R30 (CA)* R1-1
* R6-5p (MOD)
* "WARNING DRUG FREE
SCHOOL ZONE" SIGN
* R30 (CA)
* SNS
* R36 (CA) (MOD) * R30 (CA) * R99 (CA) * YELLOW SPEED

REGULATORY
SIGN
* S1-1
* S4-3P
* R1-1 * R30 (CA)
* R30 (CA)
* R30 (CA)
* R1-1
* S1-1
* SNS
* "AFTER STOP RIGHT

TURN PERMITTED ON
RED"

STOP STOP SLOW STOP
22 LL
CM
CM
22 39
22 39
39 39
KP
GB
39A
BL
CW 13' 11' 11' 13'
11' 11'
11'
13'
1'
57'
11'
11'
6' 10.5' 10.5' 6.5'

11.5'
11'
9'
7'
12'

10.5' 6'

11.5'
5'
5'
▲
10-10
■ R6-5P
10-11
■ R6-5P
10-12
■ R6-5P
10-04
10-05
■ R10-15MOD-A-L
♦ R10-15MOD-A-R
10-07
10-06
♦ R10-15MOD-A-R
■ R10-15MOD-A-L
CW
LL
10-08
R9-5
10-09
R9-5
3' 10.5' 10.5'

3.5'

5.0'
5'
1'
7'
18'
10' 17'
◘
◘
10-02 10-02 10-03
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 on © 2022 Maxar ©CNES (2022) Distribution Airbus DS
* R1-1
* "RIGHT TURN
* ONLY"
* "NO PARKING LOADING
ZONE" * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA)
* R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA)
* SNS
* R6-1
* "NO RIGHT TURN
* R30 (CA)
on © 2022 Maxar ©CNES (2022) Distribution Airbus DS
* R1-1
* "RIGHT TURN
* ONLY"
* "NO PARKING LOADING
ZONE" * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA)
* R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA) * R30 (CA)
* SNS
* R6-1
* "NO RIGHT TURN
* R30 (CA) STOP SHARE THE PATH SHARE THE PATH SHARE THE PATH SHARE THE PATH SHARE THE PATH SHARE THE PATH 39 KP
39 BL
PM
22 GB1
39 39A 8' 12' 8' 8' 6' 6'
11-01
♦ R10-15MOD-A-R
11-02
♦ W11-15P 12' 2' 4' 4'
6'
6'
20'
29'
■ R81B
11-09
70'
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distr 022 Maxar ©CNES (2022) Distribution Airbus DS on © 2022 Maxar ©CNES (2022) Distribution Airbus DS * S1-1
* S4-3P
* R30 (CA) * "NO PARKING" LOCAL
SIGN
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* R99 (CA) * "NO PARKING
LOADING ZONE" * R30 (CA) * "NO PARKING LOADING
ZONE"
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* SNS
* R28 (CA) * R28 (CA)
* SNS
* R4-1
* R2-1 (30) * R1-1
* R1-1
* SNS
* R1-1
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distr 022 Maxar ©CNES (2022) Distribution Airbus DS on © 2022 Maxar ©CNES (2022) Distribution Airbus DS * S1-1
* S4-3P
* R30 (CA) * "NO PARKING" LOCAL
SIGN
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* R99 (CA) * "NO PARKING
LOADING ZONE" * R30 (CA) * "NO PARKING LOADING
ZONE"
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* R30 (CA) * "PERMIT PARKING"

LOCAL SIGN
* SNS
* R28 (CA) * R28 (CA)
* SNS
* R4-1
* R2-1 (30) * R1-1
* R1-1
* SNS
* R1-1 STOP
STOP

STOP SHARE THE PATH SHARE THE PATH
KP 39
22 BL
GB1
39 CW
41 8' 12' 16' 6' 11'
11'
5'
5'
5'
5'
5'
11-03
♦ W11-15P
11-04
♦ W11-15P
11-07
11-08
■ R10-15MOD-A-L
♦ R10-15MOD-A-R
11-06
■ R10-15MOD-A-L
11-05
♦ R10-15MOD-A-R
GB 12' 8' 2' 5' 4'
1'
11'
14' 10'
1' 11'
8'
8'
10'

10.5'

10.5'
5'
6'
2'
6'
5' 10.5'

10.5'
4'
4' 5'

11.0'

11.0'

12.4'
11-10
R25E
■
R81A
11-11
R99
53'
120'
22'
YL1
■
▲
▲ 6'41'
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 - PART A (CONTRACT DOCUMENTS).docx

SPECIFICATIONS
For
Annual Street Rehabilitation and
Preventive Maintenance Project
Fiscal Year 2021/2022
Project No. EPW-21102
Issued for Bidding: May 26, 2022
Bids Open: June 16, 2022 at 2:00PM
For Use with the Following:

1. The State of California Department of Transportation Standard Specifications, dated 2015

2. The State of California Department of Transportation Standard Plans, dated 2015

3. Americans with Disabilities Act Standards for Accessible Design including Title II regs at 28 CFR 35.151 and 36CFR Part 1191, Appendices B & D

PUBLIC WORKS DEPARTMENT

ENGINEERING DIVISION
1333 Park Avenue, Emeryville, CA 94608
Tel. (510) 596-4330
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

TABLE OF CONTENTS

NOTICE INVITING BIDS

PART A BID DOCUMENTS

SECTION TITLE
1 BIDDER’S CHECKLIST .............................................................................. A-1 2 BLANK - NOT USED ................................................................................... A-3 3 PROPOSAL ................................................................................................ A-4 4 BIDDER’S BOND ...................................................................................... A-10 5 NON-COLLUSION DECLARATION ............................................................. A-12 6 SUBCONTRACTORS LIST ......................................................................... A-13 7 WORKERS COMPENSATION CERTIFICATE ................................................ A-16 8 CONTRACT ............................................................................................. A-17  Sample Contract
 Performance Bond
 Payment Bond
 Guarantee

PART B GENERAL PROVISIONS

SECTION TITLE
1 GENERAL ................................................................................................... B-2 2 BIDDING .................................................................................................... B-5 3 CONTRACT AWARD AND EXECUTION ........................................................ B-10 4 SCOPE OF WORK ...................................................................................... B-12 5 CONTROL OF WORK ................................................................................. B-15 6 CONTROL OF MATERIALS ......................................................................... B-25 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ......................... B-26 8 PROSECUTION AND PROGRESS ................................................................ B-42 9 PAYMENT ................................................................................................. B-46

PART C SPECIAL PROVISIONS

SECTION TITLE
1 MISCELLANEOUS ...................................................................................... C-2 2 – 8 BLANK ..................................................................................................... C-11 9 DESCRIPTION OF WORK .......................................................................... C-12 10 CONSTRUCTION DETAILS ......................................................................... C-13

PART D SUPPLEMENTAL DOCUMENTS

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN THAT sealed bids will be received by the City of Emeryville, Alameda County, California, (hereinafter "City") at the Office of the Director of Public Works, 1333 Park Avenue, Emeryville, CA 94608, until 2:00 PM, June 16, 2022, at which time bids will be publicly opened for the following project:

Annual Street Rehabilitation and Preventive Maintenance Project Fiscal Year 2021/2022 Project No. EPW-21102
This project entails street rehabilitation and preventive maintenance on various streets throughout the City of Emeryville. The specific streets included in this project are:
 41st Street (San Pablo Avenue – Adeline Street)
 43rd Street (San Pablo Avenue – Adeline Street)
 45th Street (San Pablo Avenue – Adeline Street)
 47th Street (San Pablo Avenue – Adeline Street)
 48th Street (San Pablo Avenue – City Limits)
 Salem Street (43rd Street – 45th Street)
 Essex Street (43rd Street – 45th Street)
 Doyle Street (45th Street – Steve Dain Drive)
 Steve Dain Drive (Doyle Street – San Pablo Avenue)
This project generally includes, but is not limited to, the reconstruction and preservation of asphalt pavement; replacement of traffic striping and markings; installation of signs; reconstruction of PCC sidewalks, driveways, medians, curb, gutters, and curb ramps; and reconstruction of existing bulbout planters.

In regards to asphalt pavement preservation and maintenance, the project requires the contractor to use crack seal, crack repair, and slurry seal where indicated. In regards to asphalt pavement removal and replacement, the project requires various methods including the contractor to provide a full dig out, replace the existing asphalt, and construction of new pavement section where indicated.

The work, to be completed within 35 working days, is more fully described in the Contract Documents, as defined in the Contract provided in Section 8, Part A, Bid Documents. The engineer’s estimate for this project is $1,380,000. Liquidated Damages in the Amount of $1,500 per calendar day will be assessed for failure to complete the contract work within the number of workdays specified.

Bidders and their proposed subcontractors shall hold such licenses as may be required by the laws of the State of California for the performance of the work specified in the Contract Documents. Bidders bidding as the prime Contractor shall possess a valid California State Contractor’s License, Classification A – General Engineering, C12 – Earthwork and Paving, or C32 – Parking and Highway Improvement at the time of contract award and throughout the Contract term. The Contractor will also be required to ensure that all subcontractors working on the project are holding valid licenses suitable for their trade.

Bids shall be submitted on the forms included in Part A, Bid Documents, plainly endorsed with Bidder's name together with signed acknowledgment of any and all addenda. Bidder’s attention is directed to the Section 2, Part B, Bidding. Bid Documents shall be securely sealed in a suitable envelope marked with the name and address of the Bidder, and marked in capital letters on the front of the envelope, as follows:

Annual Street Rehabilitation and Preventive Maintenance Project Fiscal Year 2021/2022 Project No. EPW-21102
Whether mailed or personally delivered, all bids shall be securely sealed in a suitable envelope and addressed to the City Engineer, City of Emeryville, Alameda County, California, 1333 Park Avenue, Emeryville, CA 94608. No late bids will be accepted and will be returned unopened.

Each bid must be accompanied by a Bid Guaranty in the form of Cash, Bidder's Bond, Certified Check or Cashier’s Check in an amount equal to at least ten percent (10%) of the Total Bid Price. The Bid Guaranty will be retained and applied to any and all damages sustained by the City in the event that the successful DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 Bidder fails or refuses to enter into the Contract awarded to it or furnish all required bonds and certificates of insurance.

Plans, Specifications, Bid Documents, Supplemental Specifications and any Addendum may be obtained free of charge from the City of Emeryville website at http://emeryville.org/904/RFPs-Bids or at www.ciplist.com.

The Contract awarded pursuant to this advertisement is subject to the State contract nondiscrimination and compliance requirements pursuant to California Government Code §12990.

The City of Emeryville hereby notifies all Bidders that it will affirmatively ensure that in any Contract awarded pursuant to this advertisement, disadvantaged business enterprises (DBEs) will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. DBEs are strongly encouraged to submit bids as both prime Contractors and subcontractors.

This is a Public Works Contract. In accordance with section 1720 et seq. of the Labor Code, the general prevailing wage rates as established by the Director of the California Department of Industrial Relations will apply. The prevailing wage rates established by the State Director of Industrial Relations can be viewed at the City’s offices, are available on the State of California’s website at http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm, or can be obtained by mail addressed to:

Prevailing Wage Unit, Division of Labor Statistics and Research, Department of Industrial Relations, P.O. Box 603, San Francisco, CA 94101.

No Contractor or subcontractor may be listed on a bid proposal or awarded a contract for a public works project unless registered with Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5 at the time of bid. Each Bidder and subcontractor must submit proof of contractor registration with DIR (e.g. a hard copy of the relevant page of the DIR's database found at: https://efiling.dir.ca.gov/PWCR/Search).

This Contract is subject to monitoring and enforcement by the DIR pursuant to Labor Code Section 1771.4.

Pursuant to Public Contract Code Section 22300, the successful Bidder may submit certain securities in lieu of the City retaining a portion of progress payments during the Project. Pursuant to California Civil Code Section 9950, the successful Bidder at the time the contract is awarded shall furnish a payment bond if civil work exceeds twenty-five thousand dollars ($25,000) in the amount of 100% of the Total Contract Price. The successful Bidder shall also provide a performance bond in the amount of 100% of the Total Contract Price.

Attention is directed to the Contract Documents for complete details and bid requirements. Said Contract Documents shall be considered as a part of any Contract awarded pursuant to this Notice Inviting Bids.

All bids are to be compared on the basis of the City Engineer's estimate of the quantities of work to be done. The City of Emeryville reserves the right to reject any or all bids, and further reserves the right to waive formal irregularities as to any bid substantially in conformity with the specifications herein referred to. The City of Emeryville reserves the right to reject any and all bids or to waive any defects or irregularity in bidding in accordance with applicable law. In accordance with California Public Contract Code Section 20103.8, if the City elects to award a contract for performance of the project, the contract will be awarded in accordance with California Public Contract Code Section 20162 and other applicable law to the responsible bidder submitting a responsive bid with the lowest total bid price. All bids will remain valid for 90 days after the bid opening. Except as permitted by law and subject to all applicable remedies, including forfeiture of bidder’s security, bidders may not withdraw their bid during the 90-day period after the bid opening.

The firm of Crossroad Lab has provided engineering services to the City for this project. Therefore, this firms, and any of their affiliates, partners, officers, employees, parent companies or subsidiaries are prohibited from being awarded the Contract for the project, subcontracting for a portion of the work under the Contract for the project, or supplying materials for the work under the Contract for the project. Accordingly, these persons and entities are ineligible to bid on the project and no Contract shall be awarded to such persons or entities identified as the Contractor, subcontractor or supplier on a submitted bid proposal for this Project.

All questions prior to award of the Contract shall be directed to the Project Manager Ryan O’Connell DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 [email protected]. The deadline for submissions of initial questions and clarifications concerning the Contract Documents is June 9, 2022, at 5:00pm. Only signed Addenda issued by the City Engineer or Project Engineer are binding.

By order of the City Council of the City of Emeryville, Alameda County, California, January 18, 2022.

Date: 5/25/2022
Ryan O’Connell, PE
Senior Civil Engineer, City of Emeryville
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 PART A

BID DOCUMENTS
FOR

ANNUAL STREET REHABILITATION AND

PREVENTIVE MAINTENANCE PROJECT
FISCAL YEAR 2021/2022
PROJECT NO. EPW-21102
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-1
SECTION 1
BIDDER’S CHECKLIST
All items on the Bidder’s Checklist should be checked next to each item and must be initialed and dated at the bottom for the Proposal to be considered complete. The City of Emeryville reserves the right to award a Contract in a manner and on the basis which will best serve the City.

The Bidders’ attention is specifically called to the following forms which must be executed in full as required:

1. (a) Bid Sheets □
The Base Bid Price, Add Alternate Price and Total Bid Price must be shown in the space on the Bid Proposal form provided.
(b) Bid Proposal Form □
A Bid Proposal form must be filled in, signed and submitted for the Bid Documents to be considered complete.

2. Bidder’s Bond (Accompanying Bid) □
If not otherwise providing cash, cashier’s check or certified check with its Bid Proposal as its bid guaranty, a Bidder’s Bond form must be filled out, signed, and submitted with the Bid Proposal for the Bid Documents to be considered complete. The surety’s power of attorney must be attached. Original signatures are required.

3. Non-Collusion Declaration □
A Non-Collusion Declaration form must be filled out, signed, and submitted with the Bid Proposal for the Bid Documents to be considered complete.

4. Subcontractors List □
A Subcontractors List form must be filled out and submitted with the Bid Proposal for the Bid Documents to be considered complete.

5. Workers Compensation Certificate □
The Bidder acknowledges that he/she must sign and attach any applicable Workers Compensation Certificate to the Bid Proposal.

6. Waste Management Plan □
Applicant is notified of need to prepare a Waste Management Plan as a project submittal.

On-line system is available at www.emeryville.wastetracking.com/# Check here signifies awareness of and intent to prepare, if awarded a contract.

7. Bond Requirements □
The Bidder understands that a performance bond issued by an approved surety equaling one hundred percent (100%) of the Total Contract Price amount will be required. A payment bond equaling one hundred percent (100%) of the Total Contract Price amount will also be required.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-2

8. Addenda □
The Bidder acknowledges that he/she must sign and attach any applicable addenda to the Bid Proposal for the Bid Documents to be considered complete.

Initial: ______________________ Date: ______________
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-3
SECTION 2
Not Used
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-4
SECTION 3

PROPOSAL
To the Honorable City Council of the City of Emeryville, Alameda County, California.

ANNUAL STREET REHABILITATION AND

PREVENTIVE MAINTENANCE PROJECT
FISCAL YEAR 2021/2022
PROJECT NO. EPW-21102
Name of Bidder
Street Address
City, State, Zip Code
Telephone No.

Email Address
FOR USE WITH THE FOLLOWING:

1. The State of California Department of Transportation Standard Specifications, 2015, and the State of California Department of Transportation Standard Plans, 2015.

The Contract Drawings are generally titled ANNUAL STREET REHABILITATION AND PREVENTIVE MAINTENANCE PROJECT FISCAL YEAR 2021/2022, PROJECT NO. EPW-21102.

Bids are to be submitted for the entire work. The amount of the bid for comparison purposes will be the total of all items.

The Bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for that purpose. In the case of unit basis items, the amount set forth under the "Item Total" column shall be the product of the unit price bid and the estimated quantity for the item.

In case of discrepancy between item price and the total set forth for the item, the item price shall prevail, provided, however, if the amount set forth as an item price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or in the case of unit basis items, is the same amount as the entry in the "Item Total" column, then the amount set forth in the "Item Total" column for the item shall prevail in accordance with the following:

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-5
PROPOSAL (CONT.) Project No. EPW-21102
(1) As to lump sum items, the amount set forth in the "Item Total" column shall be the item price. (2) As the unit basis items, the amount set forth in the "Item Total" column shall be divided by the estimated quantity for the item and the price thus obtained shall be the item price.

If this proposal shall be accepted and the undersigned shall fail to enter into the Contract and furnish the two (2) bonds in the sums to be determined as aforesaid with surety satisfactory to the Department of Public Works and provide the appropriate insurance certificates within ten (10) calendar days after the Bidder has received notice from the City Engineer that the Contract has been awarded, the City may, at its option, determine that the Bidder has abandoned the Contract, and thereupon this proposal and the acceptance thereof shall be null and void and the forfeiture of such security accompanying this proposal shall operate and the same shall be the property of the City of Emeryville. If the deadline to perform any act shall fall on a Saturday, Sunday or legal holiday of the City, then the deadline to perform said act shall fall on the next regular business day.

The undersigned, as Bidder, declares that the only persons or parties interested in this proposal as principals are those named herein; that this proposal is made without collusion with any other person, firms, or corporation and in submitting this proposal, the undersigned Bidder agrees that he has carefully examined the location of the proposed work, the annexed proposed form of Contract, and the plans and specifications therein referred to; and he proposes, and agrees if this proposal is accepted, that he will contract with the City of Emeryville in the form of a copy of the Contract annexed hereto to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the Contract, in the manner and time therein prescribed, and according to the requirements of the City Engineer as therein set forth, and that he will take in full payment therefore the following item prices to wit:

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 Contractor:

Date:

Plan Nos.: EPW-21102
No. CONTRACT BID ITEMS Quantity Unit Unit Price Total

INCIDENTAL ITEMS
Note: All items subject to any special notes or footnotes appearing on this Engineer's estimate included with the bid documents. ….. ….. N/A N/A
Note: The Contract lump sum or unit price for each Contract Bid Item shall include full compensation for all labor, materials, tools, taxes, profit, overhead, incidentals and appurtenant work necessary for performing and completing the work of the Contract Bid Item as required by the Project Plans, Specifications, Special Provisions and other Contract Documents. Such compensation shall also include or take into consideration any additional provisions or conditions specifically stated immediately following the Contract Bid Item.
….. ….. N/A N/A
Note: In the absence of a specific bid item or specific payment provisions for any portion of the work required by the Contract Documents, the bidder shall include the bidder’s compensation for that portion of the Contract work in the Contract unit price(s) and/or lump sum price(s) of the bid item(s) that require such work, or are closely related to such work. Therefore, no separate or additional payment will be made to the Contractor for any such work on the premise that such work lacks specific bid item(s) or specific payment provisions.
….. ….. N/A N/A
Note: "(P)" adjacent to a Contract bid item designates a "Partial Pay Item" ….. ….. N/A N/A Note: "(F)" adjacent to a Contract bid item designates a Final Pay Quantity ….. ….. N/A N/A Note: "(S)" adjacent to a Contract bid item designates a "Specialty Item" ….. ….. N/A N/A 1 Supplemental Work 1 LS $150,000.00 $150,000.00
2 Mobilization 1 LS
3 Traffic Control System 1 LS
4 Water Pollution Control 1 LS
Street Rehabilitation and Preventive Maintenance
5 Install Crack Fill/Repair, (P) 5,000 LF
6 Type II Slurry Seal 380,000 SF
7 Remove and Replace Pavement Section (8" Max) - Dig Out Locations, (P) 5,000 SF 8 Raised DGAC (1” Minimum) 500 SF
9 Adjust Valves and Covers to Grade 50 EA
10 Top Soil 200 SF
11 4" Median Curb and PCC 516 SF
12 6" Median Curb and PCC 1,306 SF
13 6" Curb and Gutter 18 LF
14 PCC Curb Ramp per Caltrans Standard Plan A88A. (Type per plan, includes any modifications as necessary.) 7 EA
Traffic Improvements
15 K72 Marker Post, (S) 205 EA
16 Flexible Mount Delineator, (S) 60 EA
17 Slotted Speed Cushion, (S) 6 EA
18 Wheel Stop, (S) 20 EA
19 6" Solid Double Yellow Thermoplastic (Detail 22), (S) 4,924 LF 20 6" Solid Yellow Thermoplastic (Detail 25), (S) 276 LF 21 6" Solid White Thermoplastic (Detail 27B), (S) 646 LF 22 8" Solid White Thermoplastic Stripe (Detail 38), (S) 106 LF 23 6" Solid White Thermoplastic Stripe (Detail 39), (S) 14,200 LF 24 6" Dashed White Thermoplastic Stripe (Detail 39A), (S) 1,125 LF 25 6" Dashed Yellow Thermoplastic Stripe (Detail 41), (S) 40 LF 26 4" Solid Yellow Thermoplastic Stripe, (S) 109 LF
27 4" Solid White Thermoplastic Stripe - BUFFER, (S) 2,836 LF 28 6" Solid Yellow Thermoplastic Stripe, (S) 70 LF
29 6" Dashed Yellow Thermoplastic Stripe, (S) 576 LF
30 8" Solid White Thermoplastic Stripe - BIKE, (S) 55 LF Sub-Total: Street Rehabilitation and Preventive Maintenance Sub-Total: Incidental Items

EMERYVILLE, CALIFORNIA
Amount rounded to Nearest: $.01

BID SHEET
Project No. EPW-21102
2011/2022 STREET REHABILITATION AND PREVENTIVE MAINTENANCE PROJECT EPW-21102 Part A, Page 6 5/26/2022
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 Contractor:

Date:

Plan Nos.: EPW-21102
No. CONTRACT BID ITEMS Quantity Unit Unit Price Total

EMERYVILLE, CALIFORNIA
Amount rounded to Nearest: $.01

BID SHEET
Project No. EPW-21102
2011/2022 STREET REHABILITATION AND PREVENTIVE MAINTENANCE PROJECT 31 12" Solid Yellow Thermoplastic Stripe, (S) 185 LF
32 12" Solid White Thermoplastic Stripe - CAR, (S) 558 LF 33 Thermoplastic Pavement Markings - SOLID WHITE (AUTO LANES), (S) 2,700 SF 34 Thermoplastic Pavement Markings - SOLID YELLOW (AUTO LANES), (S) 7,448 SF 35 Thermoplastic Pavement Markings - SOLID BLUE (HANDICAP PARKING), (S) 50 SF 36 Preformed Thermoplastic - Bike Stencil - SOLID WHITE, (S) 330 SF 37 Preformed Thermoplastic - Ped Bike Shared Sticker, (S) 11 EA 38 Preformed Thermoplastic - Bike Lane Field - SOLID GREEN, (S) 2,490 SF 39 Preformed Thermoplastic - Bike Lane Field - DASHED GREEN, (S) 2,075 SF 40 Parking Tips, (S) 98 EA
41 Paint Curb (2-coats) - Red, (S) 1,565 LF
42 Paint Curb (2-coats) - Blue, (S) 25 LF
43 Paint Curb (2-coats) - Gray, (S) 164 LF
44 Paint Curb (2-coats) - Yellow, (S) 165 LF
45 Remove Existing Striping, Markings, and Markers, (S) 1 LS 46 Furnish Single-Sheet Aluminum Sign Panel (0.063" Unframed), (S) 328 SF 47 Install Sign Panel (SSBM), (S) 2 EA
48 Install Sign Panel (Existing Post), (S) 25 EA
49 Install Sign Panel (New Post), (S) 28 EA
50 Remove Existing Post, (S) 3 EA
51 Remove Sign Panel, (S) 15 EA
52 Relocate Sign to New Pole, (S) 4 EA
Bidder
Authorized Signature / Title
Sub-Total: Traffic Improvements

TOTAL FOR ALL BID ITEMS
EPW-21102 Part A, Page 7 5/26/2022
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-8
PROPOSAL (CONT.) Project No. EPW-21102
Accompanying this proposal is
(Notice: insert the words CASH ($), CASHIER'S CHECK, CERTIFIED CHECK, OR BIDDERS BOND) in an amount equal to at least ten percent of the total of the Total Bid Price.

The names of all persons interested in the foregoing proposal as principals are as follows:

IMPORTANT NOTICE: If Bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer, and manager thereof; if a co-partnership, state true name of firm, also names of all individual copartners composing firm; if Bidder or other interested person is an individual, state first and last names in full.

Licensed in accordance with an act providing for the registration of Contractors:

Contractor: License No.

Licensee Name
License Qualifier
Date Issued
Other License Classifications Hazardous Substances Removal: License No

Licensee Name (May be Subcontractor)
License Qualifier
Date Issued
DIR Registration Number
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-9
PROPOSAL (CONT.) Project No. EPW-21102
ADDENDA This Proposal is submitted with respect to the changes to the contract included in addenda numbers ____________ (Fill in any addenda numbers if addenda have been received.)
By my signature on this proposal, I certify, under penalty of perjury, under the laws of the State of California, that the foregoing questionnaire and statements of Public Contract Code Section 10162, 10232 and 10285.1 are true and correct and that the Bidder has complied with the requirements of Section 8103 of the Fair Employment and Housing Commission Regulations (Chapter 5, Title 2 of the California Administrative Code). By my signature on this proposal, I further certify, under penalty of perjury, under the laws of the State of California, that the Non-Collusion Affidavit required by Public Contract Code Section 7106 is true and correct.

SIGN HERE >>> by:
its:

Date:

END OF PROPOSAL

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-10
SECTION 4

BIDDER'S BOND
KNOW ALL PERSONS BY THESE PRESENTS:

That , as Principal, and , as Surety, are
held and firmly bound unto the City of Emeryville, a municipal corporation located in Alameda County, State of California (hereinafter "City"), in the sum of ($) , being at least ten percent (10%) of the total amount of the Grand Total Bid Price, for the payment of which sum in lawful money of the United States of America to the City of Emeryville we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the Principal has submitted said bid to the City for the ANNUAL STREET REHABILITATION AND PREVENTIVE MAINTENANCE PROJECT FISCAL YEAR 2021/2022, PROJECT NO. EPW-21102 ("Project");
NOW, THEREFORE, the condition of the above obligation is such that if a Contract is awarded by the City within the time and in the manner required by the specifications for the Project, and a written Contract is entered into with the City and the requisite bond or bonds and insurance certificates are furnished, then this obligation shall become null and void, otherwise to remain in full force and effect for ninety (90) days following the public opening of bids for this solicitation.

In the event suit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all costs incurred by the City in such suit, including a reasonable attorneys fee to be fixed by the Court.

Dated , 20__.

TO BE CONSIDERED COMPLETE,
BOTH THE PRINCIPAL AND Principal

SURETY MUST SIGN THIS
BIDDER'S BOND. IN ADDITION, By:

THE SURETY'S SIGNATURE MUST

BE NOTARIZED AND
THE SURETY'S POWER OF ATTORNEY Surety
MUST BE ATTACHED. ORIGINAL
SIGNATURES ARE REQUIRED By:

Address of Surety

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-11

CERTIFICATE OF ACKNOWLEDGMENT

STATE OF CALIFORNIA
ss

COUNTY OF ALAMEDA
On , 20__ before me, ,
Notary Public, personally appeared
, who proved to me
on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature: (Seal Above)

END OF BIDDERS BOND

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-12
SECTION 5

NON-COLLUSION DECLARATION
The undersigned declares:

I am the of , the party making
the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

The undersigned declares under penalty of perjury that the information contained in this proposal and all accompanying documents are true and correct.

Executed on
Legal Company Name
By:

Title:

Date:

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-13
SECTION 6

SUBCONTRACTORS LIST
In accordance with Section 2-1.10 “Subcontractors List" of the Standard Specifications for this Contract, the following list of Subcontractors is submitted with the Proposal and made a part thereof. (Use multiple sections for same subcontractor if all of their line items do not fit under one section.)

1. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

2. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

3. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-14

4. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

5. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

6. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

7. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No. ________________________________ Address
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-15
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

8. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

9. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

10. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 A-16
SECTION 7
WORKERS’ COMPENSATION CERTIFICATE
To be executed by Bidder and submitted with bid
By signing below, Bidder is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake selfinsurance in accordance with the provision of that code, and if awarded a Contract, Bidder will comply with such provisions before commencing the performance of the work of this Contract.

Firm Name _
Signature of Authorized Official
Printed Name of Authorized Official
Title of Authorized Official _
Date

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-20103 A-17
SECTION 8

CONTRACT
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

SAMPLE CONSTRUCTION CONTRACT
This Contract is made and entered into this day of ________, 202__, by and between CITY OF EMERYVILLE, a municipal corporation ("City") and __________________________ ("Contractor").

W I T N E S S E T H:

WHEREAS, by Resolution No.__________, the City Council of the City of Emeryville has authorized the Director of Public Works to solicit public bids for _____________________, Project No. EPW-_______, CIP No. ____________ (the “Project”); and WHEREAS, the City has conducted a public bidding procedure in compliance with all applicable laws; and

WHEREAS, Contractor submitted the lowest responsible bid; and WHEREAS, the City has determined that the Contractor is qualified by training and experience to render such services; and
NOW, THEREFORE, the parties mutually agree as follows:

1. Contract Documents
The following documents, including their respective exhibits and addenda (collectively "Contract Documents"), are by this reference incorporated in and made a part of this Contract in the following order of precedence:
a. Amendments to this Contract
b. Contract
c. Addenda to Invitation for Bid
d. Supplemental Specifications
e. Instructions to Bidders
f. City of Emeryville Standard Specifications
g. State of California Department of Transportation Standard Plans (2015) h. State of California Department of Transportation Standard Specifications (2015) i. Project Plans, Specifications, and Contract Drawings for _____________________, Project No. EPW-_______, CIP No. ____________
j. Required bond documents
k. Notice to Contractors
l. Contractor's Bid and Proposal, as accepted by City
J. Exhibit A: [Reserved]
K. Exhibit B: Insurance Requirements
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

2. Scope of Work
In conformance with the Contract Documents, Contractor will furnish, all labor, materials, equipment, incidentals, transportation and disposal for services required in order to perform and complete the Project.

3. Price
The total amount to be paid under this Contract for all of the work set forth in Section 2 above is not to exceed $ ( DOLLARS) ("Total Contract Price"). This price includes all costs for labor, materials, tools, equipment, services, warranty, taxes, insurance, overhead, profit and all other costs necessary to perform the work in accordance with this Contract.

4. Time for Completion
After the Contract has been executed by City, Contractor shall begin work within seven (7) calendar days after the effective date of the Notice to Proceed issued by City and shall diligently prosecute the work to completion within _________ ( ) working days from the effective date of the Notice to Proceed. Liquidated Damages in the Amount of $_____ per calendar day will be assessed for failure to complete the contract work within the number of workdays specified.

5. Indemnification
To the fullest extent permitted by law, Contractor shall indemnify, defend, and hold harmless City and City’s members, officers, agents, employees and volunteers, from and against any and all claims, losses, liabilities of every kind, nature and description, damages, injury (including without limitation injury to or death of an employee of Contractor or subcontractors as well as any claim by any employee, agent, Contractor or independent contractor hired or employed by Contractor that such persons or individuals are entitled to any benefit otherwise provided to employees of the City, including coverage under the California Public Employee Retirement System), costs and expenses of any kind, whether actual, alleged or threatened, including, without limitation, incidental and consequential damages, court costs, reasonable attorneys’ fees, litigation expenses, and fees of expert contractors or expert witnesses incurred in connection therewith and the costs of investigation, arising out of, pertaining to, or relating to, directly or indirectly, in whole or in part, the negligence, recklessness, or willful misconduct of Contractor, any subcontractor, anyone directly or indirectly employed by them or anyone that they control. This indemnification obligation is not limited in any way by any limitation on the amount or type of damages or compensation payable to or for Contractor. This obligation to indemnify and defend the City, its members, officers, agents, employees and volunteers shall survive termination of this Contract. Notwithstanding the foregoing, to the extent required by Civil Code section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the City or the City’s agents, servants, or independent DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 contractors who are directly responsible to the City, or for defects in design furnished by those persons

6. No Waiver
Failure of City to insist upon strict performance of any of the terms and conditions hereof, or failure or delay to exercise any rights or remedies or to properly notify Contractor in the event of breach, or the acceptance of or payment for any good hereunder, shall not release Contractor of any of the warranties or obligations of this Contract and shall not be deemed a waiver of any right of City to insist upon strict performance hereof.

7. Notices
Any notice required to be given by this Contract will be in writing and deemed effective upon personal delivery, or 1 business day after being sent via registered or certified mail return receipt requested or by overnight commercial courier providing next business day delivery and addressed to the following respective parties:

City Contractor
City of Emeryville
Attn: ___________
1333 Park Ave
Emeryville, CA 94608

8. Entire Contract
This Contract contains the entire agreement of the parties with respect to the subject matter of this Contract. Any modifications to this Contract shall be in writing.

9. Authority to Contract
Contractor covenants and declares that it has obtained all necessary approvals to bind Contractor to this Contract and that the representative signing the Contract is authorized to do so.

IN WITNESS HEREOF, City and Contractor have caused this Contract to be executed as of the date first above written.

CITY OF EMERYVILLE

__________________________
Christine Daniel, City Manager
Approved as to form:
_______________________________
City Attorney
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 Contractor
Firm Name: ______________________________

Address: _______________________________

Telephone: ______________________________
Fax No: _________________________________
Email Address: _____________________________
SIGN HERE >>> by: ____________________________________
____________
its: ___ ________________________
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS that,
WHEREAS, the City of Emeryville, a municipal corporation located in Alameda County, State of California (hereinafter referred to as "City"), has entered into a Contract with , (hereinafter referred to as "Principal"), to construct the ANNUAL STREET REHABILITATION AND PREVENTIVE MAINTENANCE PROJECT FISCAL YEAR 2021/2022, PROJECT NO. EPW21102; and WHEREAS, the Principal is required under the terms of the Contract to furnish a bond for the faithful performance of said Contract.

NOW, THEREFORE, we, the Principal and
, as Surety, are held and firmly bound unto the City in the penal sum of ($ ), lawful money of the United States of America, being not less than one hundred percent (100%) of the Contract Amount, to be paid to the City or its successors and assigns; for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if the above-bound Principal, or its heirs, executors, administrators, successors, transferees, or assigns approved by the City, shall promptly and faithfully perform the covenants, conditions, and agreements in the Contract until completion, during the original term and any extensions thereof as may be granted by the City, with or without notice to Surety, and shall also promptly and faithfully perform all covenants, conditions, and agreements of any alteration of the Contract made as therein provided, notice of which alterations to Surety being hereby waived, provided on the Principal’s part to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City, its officers employees and agents, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

FURTHERMORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that upon Final Completion of the Contract, the above obligation shall be reduced to the amount of ______________________ Dollars, ($ ), being not less than twenty percent (20%) of the Contract Amount, and shall hold for a period of two (2) years, during which time if the above bound Principal, or its heirs, executors, administrators, successors, transferees, or assigns shall fail to make full, complete and satisfactory repair and replacements or totally to protect the City from loss or damage made evident during said period from the date of Final Completion of the Contract, and resulting from or caused by defective materials or faulty workmanship in the prosecution of the work done, or failure to satisfy the warranty as set forth in the Contract, the above obligation in said sum of $ , shall remain in full force and effect, otherwise the above obligation shall be void.

Whenever Principal shall be declared by the City to be in default under the Contract, Surety shall promptly remedy the default, or shall promptly do one of the following at the City’s election:

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

1. Undertake through its agents or independent Contractors, reasonably acceptable to the City, to complete the Contract in accordance with its terms and conditions and to pay and perform all obligations of Principal under the Contract, including without limitation, all obligations with respect to warranties, guarantees, and the payment of liquidated damages.

2. Reimburse the City for all costs the City incurs in completing the Contract, and in correcting, repairing or replacing any defects in materials or workmanship and/or materials and workmanship which do not conform to the specifications in the Contract.

Further, the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the Work to be performed thereunder or the Specifications accompanying the same shall release or exonerate the Surety on this bond or in any way affect its obligations under this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work, or to the Contract Documents.

The Surety’s obligations hereunder are independent of the obligations of any other surety for the performance of the Contract, and suit may be brought against the Surety and such other sureties, jointly and severally, or against any one or more of them, or against less than all of them without impairing the City’s rights against the others.

No right of action shall accrue on this bond to or for the use of any person or corporation other than the City or its successors or assigns.

In the event the City, or its successors or assigns, shall be the prevailing party in an action brought upon this bond, then in addition to the penal sum hereinabove specified, Principal and the Surety, jointly and severally, agree to pay to the City or its successors or assigns, a reasonable sum on account of its attorney’s fees incurred in such action, which sum shall be fixed by the court.

IN WITNESS WHEREOF, the above bound parties have executed this instrument under their seals this day of , 20____, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.

Principal
__________________________________________________
Name
__________________________________________________
Title
__________________________________________________
Signature
(SEAL)
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 Surety
__________________________________________________
Name
__________________________________________________
Title
__________________________________________________
Signature
(SEAL)

*Note: To be considered complete, both the Principal and an admitted Surety Insurer authorized by the California Insurance Commissioner to transact surety business in the State of California must sign the Performance Bond.

In addition, the Surety’s signature must be notarized and a copy of the Surety’s Power of Attorney

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

PAYMENT BOND
KNOW ALL PERSONS BY THESE PRESENTS, that
WHEREAS, the City of Emeryville, a municipal corporation located in Alameda County, State of California (hereinafter "City"), has awarded a contract to , (hereinafter "Principal"), to construct the ANNUAL STREET REHABILITATION AND PREVENTIVE MAINTENANCE PROJECT FISCAL YEAR 2021/2022, PROJECT NO. EPW21102; and WHEREAS, the Principal is required to furnish a bond in connection with the Contract, providing that if Principal, or any of it or its subcontractors, shall fail to pay for any materials, provisions, or other supplies or teams used in, upon, for or about the performance of the Work contracted to be done, for any work or labor thereon of any kind, or claims to which reference is made in Section 9554 of the Civil Code, the Surety of this bond will pay the same to the extent hereinafter set forth.

NOW, THEREFORE, we, the undersigned Principal, and ,
as Surety, are held and firmly bound unto the City in the penal sum of Dollars, ($ ), lawful money of the United
States of America, being not less than one hundred percent (100%) of the Contract Amount, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, or its heirs, executors, administrators, successors, transferees, assigns, or subcontractors, shall fail to pay any of the persons named in Section 9100 of the Civil Code, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under this Contract, or any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees of the Contractors and his subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, the Surety will pay for the same, in an amount not exceeding the sum specified in this bond and will also pay, in case suit is brought upon this bond, a reasonable attorney's fee, to be fixed by the court.

This bond shall inure to the benefit of any and all persons named in Section 9100 of the Civil Code so as to give a right of action to them or their assigns in any suit brought upon this bond.

This bond is given to comply with Sections 9550 and 9554 of the Civil Code. The liability of the PRINCIPAL and SURETY hereunder is governed by the provisions of said Code, all acts amendatory thereof, and all other statutes referred to therein, including Section 8152 of the Civil Code.

And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract, or to the work to be performed thereunder, or the Specifications accompanying the same shall in any way affect its obligations on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the Work or to the Contract Documents.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their seals this day of 20 , the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

Principal

Name

Title

Signature
(SEAL)
Surety

Name

Title
Signature
(SEAL)
*Note:

To be considered complete, both the Principal and an admitted Surety Insurer authorized by the California Insurance Commissioner to transact surety business in the State of California must sign the Payment Bond. In addition, the Surety’s signature must be notarized and a copy of the Surety’s Power of Attorney must be attached.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

GUARANTEE
TO THE CITY OF EMERYVILLE for construction of the following Project:

ANNUAL STREET REHABILITATION AND PREVENTIVE MAINTENANCE PROJECT FISCAL YEAR 2021/2022, PROJECT NO. EPW-21102
By signing below, Contractor hereby warrants and guaranties to City of Emeryville all ("City") construction performed on this Project, including all material and equipment incorporated therein, as set forth below:

1. Pursuant to this Guarantee, Contractor agrees to unconditionally guarantee 1) the quality and adequacy of all of work provided on the Project including, without limitation, all labor, materials, workmanship, methods of installation, and equipment provided by Contractor and/or its Subcontractors (of all tiers) in connection with the Work under normal application, installation, and use and service conditions (collectively "Work"); and 2) that the work is fit for the purposes intended. The Guarantee provided hereunder shall become effective on the date of Substantial Completion; or where applicable, the Guarantee shall become effective on the first day following Substantial Completion of a specifically defined phase of the Project; or on such other date as may be specified elsewhere in the Contract Documents; and once effective, the Guarantee shall remain operative and shall bind Contractor as further described herein for a period of two (2) years, or such longer period of time as may be prescribed by laws or regulations, or by the terms of Contract Documents ("Warranty Period").

This Guarantee is in addition to any warranties or guarantees required or provided by the manufacturer or supplier or otherwise provided at law with respect to Contractor’s duties, obligations and performance under the Contract Documents.

2. Neither final payment nor use or occupancy of the Work performed by the Contractor shall constitute an acceptance of Work not done in accordance with this Guarantee or relieve Contractor of liability with respect to any express warranties or responsibilities for faulty materials or workmanship. Contractor shall remedy any defects in the Work and pay for any damage resulting therefrom, which shall appear within the Warranty Period.

3. If, within the Warranty Period, the Work, or any portion thereof, is found to be defective, the City shall have the unqualified option to make any needed replacements or repairs itself or to have such replacements or repairs performed by Contractor. Such repairs or replacements shall include, without limitation, removal of any such defective Work and replacement of such Work with Work that is not defective, and satisfactory correction, or removal and replacement of any damage to other Work or the work of others resulting therefrom.

If City elects to have said repairs or replacements performed by Contractor, Contractor shall promptly, without cost to City, and in accordance with City’s written instructions, correct such defective Work. If City elects to perform the repairs or replacements, Contractor agrees to pay for all claims, costs, losses and damages caused by or resulting from such removal and replacement by City. While carrying out correction, or removal and replacement of defective or nonconforming Work the Contractor must provide the same insurance specified before Contract acceptance. Nonconforming Work that is remedied pursuant to this Warranty shall be subject to an extended warranty obligation for the period of two (2) years after the acceptance of the repairs to the nonconforming work.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

4. Inspection of the Work shall not relieve Contractor of any of its obligations under the Contract Documents. Even though Work required to be provided under the Contract Documents has been inspected, accepted, and estimated for payment, Contractor shall, at its own expense, replace or repair any such equipment, material, or Work found to be defective or otherwise not to comply with the requirements of the Contract Documents up to the end of the applicable Warranty Period.

5. This Guarantee is not in lieu of any other liability imposed on Contractor under the Contract Documents and at law with respect to Contractor’s duties, obligations, and performance under the Contract Documents, and is in addition to any warranties or guarantees required or provided by manufacturers or suppliers. In the event of any conflict or inconsistency between the terms of this Guarantee and any obligation of the Contractor under the Contract Documents or at law, such inconsistency or conflict shall be resolved in favor of the higher level of obligation of the Contractor.

6. If the Contractor fails or refuses to comply with its obligations under this Guarantee, City shall be entitled to all costs and expenses, including attorneys' fees, reasonably incurred by reason of the said failure or refusal.
______________________________ ______________________________ Contractor Date
______________________________
Contractor's Name (print)
______________________________
Address
______________________________
City/State/Zip
______________________________
Phone
______________________________
Fax No:

END OF DOCUMENT
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-1 5/25/2022
PART B

GENERAL PROVISIONS
FOR

ANNUAL STREET REHABILITATION AND

PREVENTIVE MAINTENANCE PROJECT
FISCAL YEAR 2021/2022
PROJECT NO. EPW-21102
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-2 5/25/2022

CITY OF EMERYVILLE

DEPARTMENT OF PUBLIC WORKS

STANDARD SPECIFICATIONS
These Standard Specifications are to be used in conjunction with the State of California, Department of Transportation Standard Specifications and Standard Plans dated 2015. In absence of revision by these Standard Specifications, comply with the State of California Department of Transportation Standard Specifications dated 2015.

DIVISION I GENERAL PROVISIONS
1 GENERAL
The Bidder's attention is directed to the provisions in Division I, Section 1, "General," of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 1, "General," of the Caltrans Standard Specifications, 2015, as follows:

SECTION 1-1.01 GENERAL
Add to 1st paragraph in Section 1-1.01 General as follows:

When counting paragraphs, individually numbered items and tables are part of the preceding paragraph.

Replace the 8th paragraph of Section 1-1.01 General with the following:

The Engineer will number bid items consecutively and uniquely for each contract.

Delete item 1 Assignments in the list in the 12th paragraph of Section 1-1.01 General.

SECTION 1-1.05 REFERENCES
Replace first sentence of the 4th paragraph of Section 1-1.05 References with the following:

Where a section number is referenced without a reference to a document, the reference is to a section of the Standard Specifications as revised by the City Standard Specifications and Special Provisions.

SECTION 1-1.07 DEFINITIONS
SECTION 1-1.07B GLOSSARY
Add to Section 1-1.07B Glossary, and where a glossary term definition already exists in the Standard Specifications, 2015, replace said term as follows:

Architect: The Engineer as defined in this section.

City: City of Emeryville

Department or Department of Transportation: The City of Emeryville.

Director or Director of Transportation: The City of Emeryville Public Works Director or designee.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-3 5/25/2022
Engineering Standards: The current City of Emeryville Engineering Standards.

Engineer: The City Engineer, City of Emeryville, acting either directly or through properly authorized agents, the agents acting within the scope of the particular duties delegated to them.

Excusable Delay: Delay caused by the City and not reasonably foreseeable when the work began such as:

1. Change in the work;

2. City action that is not part of the Contract;

3. Described facility rearrangement not rearranged as described, by the utility owner by the date specified, unless:
(i) the rearrangement is solely for the Contractor's convenience, or (ii) as a result of a Contractor proposed construction method or detail;

4. City's failure to obtain timely access to the right-of-way; or

5. City's failure to review a submittal or provide notification in the time specified.

Federal Aid Contract: A project that is identified within the Special Specifications as being financed with Federal funding and for which you and the City must follow unique Federal requirements.

Highway: Highway or Highway Right of Way means the work site(s) as identified in the contract.

Holiday: Holiday shown in the following table:

Holiday Date Observed
Sunday Every Sunday
New Year’s Day January 1st
Birthday of Martin Luther King, Jr. 3rd Monday in January Washington’s Birthday 3rd Monday in February
Memorial Day Last Monday in May
Independence Day July 4th
Labor Day 1st Monday in September
Indigenous Peoples Day 2nd Monday in October
Veterans Day November 11th
Thanksgiving Day 4th Thursday in November
Day after Thanksgiving Day after Thanksgiving Day
Day before Christmas Day Last working day prior to Christmas Day Christmas Day December 25th
Day before New Year’s Day Last working day prior to New Year’s Day Caesar Chavez Day is not a City recognized Holiday but can be recognized through a written change order. If the holiday falls on a Sunday, the Monday following is a holiday. If the holiday falls on a Saturday, the preceding Friday is a holiday.

Laboratory: The City or a designated laboratory authorized by the City to test materials and work involved in the contract.

Landscape Architect: The Engineer as defined in this section.

MUTCD: The most current version of the California Manual on Uniform Traffic Control Devices.

Office of Structure Design: The Office of the City Engineer at the address located in the special provisions for the submission of bids.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-4 5/25/2022
Plans:

1. Project Plans: Drawings specific to the project, including authorized shop drawings.

2. Engineering Standards: Drawing standard to City of Emeryville.

3. Standard Plans: Drawing standard to Caltrans.

Permanent erosion control establishment period: Number of working days shown on the Notice to Bidders for permanent erosion control establishment work Plant establishment period: Number of working days shown on the Notice to Bidders for plant establishment work.

Specifications: The directions, provisions and requirements contained in the City of Emeryville, Standard Specifications and engineering standards as supplemented by the special provisions. Whenever the term “these specifications” or “these Standard Specifications” is used in this book, it means the provisions set forth in this book, in conjunction with, by reference, the edition of the State Standard Specifications as referenced in the beginning of this book. The Department of Transportation publications entitled Labor Surcharge and Equipment Rental Rates and General Prevailing Wage Rates are to be considered as a part of the special provisions.

State: The City of Emeryville.

Transportation Building, Sacramento City Hall, City of Emeryville, State of California.

State Highway Engineer The City Engineer of the City of Emeryville, State of California.

State Standard Specifications: Means the Standard Specifications of the California Department of Transportation, Business and Transportation Agency, dated 2015.

The Greenbook. Parts 2 through 6 of the Standard Specifications for Public Works Construction, 2015 Edition.

SECTION 1-1.08 DISTRICTS
Delete Section 1-1.08 Districts.

SECTION 1-1.11 WEB SITES, ADDRESSES, AND TELEPHONE NUMBERS Add to Section 1-1.11 Web Sites, Addresses, and Telephone Numbers as follows:

Reference Web Site Address Telephone Number
City of
Emeryville http://www.emeryville.org/ 1333 Park Avenue Emeryville, CA 94608 510-596-4334 On-line Plan
Repository
http://www.ciplist.com and
http://emeryville.org/904/RFPs-Bids
Delete from Section 1-1.11 Web Sites, Addresses, and Telephone Numbers the reference to Bidders' Exchange.

SECTION 1-1.12 MISCELLANY
Replace Section 1-1.12 Miscellany with the following:

Make checks and bonds payable to the City of Emeryville.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-5 5/25/2022
2 BIDDING
The Bidder's attention is directed to the provisions in Division I, Section 2, Bidding, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

The form of Bidder's Bond will be found following the signature page of the Proposal.

In accordance with Public Contract Code Section 7106, a Non-collusion Affidavit is included in the proposal.

Signing the proposal shall also constitute signature of the Non-collusion Affidavit.

Replace, Delete or Add to Division I, Section 2, Bidding, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 2-1.01 GENERAL
Replace Section 2-1.01 General with the following:

Section 2 includes specifications related to bid eligibility and the bidding process.

SECTION 2-1.02 BID INELIGIBILITY
Replace Section 2-1.02 Bid Ineligibility with the following:

If an individual, firm, partnership or corporation, including any of its affiliates, partners, officers, employees, parent companies or subsidiaries, has provided architectural or engineering services to the City for this Contract before bid submittal for this Contract, then such individual, firm, partnership and corporation, and any of its affiliates, partners, officers, employees, parent companies or subsidiaries is prohibited from any of the following:

1. Submitting a bid

2. Subcontracting for a part of the work

3. Supplying materials.

The firm of Kimley Horn has provided engineering services to the City for this Contract. Therefore, this firm, and any of their affiliates, partners, officers, employees, parent companies or subsidiaries are prohibited from being awarded the Contract for the project, subcontracting for a portion of the work under the Contract, or supplying materials for the work under the Contract. Accordingly, these persons and entities are ineligible to bid on the project and no Contract shall be awarded to such persons or entities identified as the Contractor, subcontractor or supplier on a submitted bid proposal for this Contract.

SECTION 2-1.03 CONTRACTOR REGISTRATION
Replace Section 2-1.03 Contractor Registration with the following:

No contractor or subcontractor may be listed on a bid proposal for this Contract unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

SECTION 2-1.05 ADDENDUM
Add Section 2-1.05 Addendum as follows:

During the course of the bidding process if changes are made to the Plans, Specifications, Bid Documents or other Contract Documents, they will be posted to http://www.ciplist.com and http://emeryville.org/904/RFPsBids for prospective Bidders.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-6 5/25/2022
If discrepancies or apparent errors are found in the Contract Documents prior to the date of bid opening, Bidders shall submit a written request for clarification to the City Engineer, a minimum of Five (5) Days prior to Bid Date, which response to said request will be given in the form of addenda to all Bidders, if time permits.

The correction of any discrepancies in, or omissions from the Plans, Specifications, Bid Documents or other Contract Documents, or any interpretation thereof, during the bidding process will be made only by Addendum issued in writing by the City and signed by the City Engineer. A copy of each such Addendum issued by the City will be posted to http://www.ciplist.com and http://emeryville.org/904/RFPs-Bids. Any other interpretation or explanation of such documents will not be considered binding.

All Addenda must be signed by a Bidder and included with their proposal at the time of bid opening.

SECTION 2-1.06 BID DOCUMENTS
SECTION 2-1.06A GENERAL
Replace Section 2-1.06A General with the following:

The Bid Documents, set forth in Part A of City of Emeryville Specifications, include bid proposal form, certifications, bidder’s bond, declarations and acknowledgements. A standard proposal form, which, when filled out and executed shall be submitted as that Bidder's bid. Bids not presented on forms so furnished, and copies or facsimiles of the Bidder's completed and executed proposal forms submitted as a bid may be rejected by Owner in its sole discretion. Bid Documents, including Plans, Specifications, Notice Inviting Bids, Supplemental Specifications and any Addendum can be obtained on the internet at http://www.ciplist.com and http://emeryville.org/904/RFPs-Bids. State of California Department of Transportation Standard Specifications, 2015, and State of California Department of Transportation Standard Plans, 2015, are available for review at the City Public Works Office.

SECTION 2-1.06B SUPPLEMENTAL PROJECT INFORMATION
Replace Section 2-1.06B Supplemental Project Information with the following:

The availability or use of information described in this Section is not intended to be and shall not be construed to relieve the Bidder or Contractor from properly examining the site and making such additional investigations as it may elect, or from properly fulfilling all the terms of the Contract Documents.

SECTION 2-1.07 JOB SITE AND DOCUMENT EXAMINATION
Replace Section 2-1.07 Job Site And Document Examination with the following:

Examine the job site and Bid Documents. Notify the City of apparent errors and patent ambiguities in the Plans, Specifications, Notice Inviting Bids, Bid Documents, Supplemental Specifications and any Addendum. Failure to do so may result in rejection of a bid or rescission of an award.

Bid submission is your acknowledgment that you have examined the job site and Plans, Specifications, Notice Inviting Bids, Bid Documents, Supplemental Specifications and any Addendum and are satisfied with:

1. General and local conditions to be encountered;

2. Character, quality, and scope of work to be performed;

3. Quantities of materials to be furnished;

4. Character, quality, and quantity of surface and subsurface materials or obstacles; and

5. Requirements of the Contract.

SECTION 2-1.09 BID ITEM LIST
Replace Section 2-1.09 Bid Item List with the following:

Submit a bid based on the bid item quantities shown on the Bid Sheets.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-7 5/25/2022
SECTION 2-1.10 SUBCONTRACTORS LIST
Replace Section 2-1.10 Subcontractors List with the following:

On the Subcontractors List form, list each subcontractor that will perform work in an amount in excess of 1/2 of 1 percent of the total bid or $10,000, whichever is greater (Pub Cont. Code § 4100 et seq.).

For each subcontractor listed, the Subcontractors List form must show:

1. Business name and the location of its place of business.

2. California contractor license number.

3. Department of Industrial Relations contractor registration number.

4. Portion of work it will perform. Show the portion of the work by:

4.1. Bid item numbers for the subcontracted work

4.2. Dollar value and percentage of the subcontracted work for each bid item listed

4.3. Description of the subcontracted work if the percentage of the bid item listed is less than 100 percent
SECTION 2-1.12 DISADVANTAGED BUSINESS ENTERPRISES
Add to Section 2-1.12A:

This section is applicable to federally funded projects and only as directed in the special provisions.

SECTION 2-1.15 DISABLED VETERAN BUSINESS ENTERPRISES
Add to Section 2-1.15A:

This section is applicable only as directed in the special provisions.

SECTION 2-1.18 SMALL BUSINESS AND NON–SMALL BUSINESS SUBCONTRACTOR PREFERENCES Add to Section 2-1.18A:

This section is applicable only as directed in the special provisions.

SECTION 2-1.27 CALIFORNIA COMPANIES
Delete Section 2-1.27 California Companies.

SECTION 2-1.33 BID DOCUMENT COMPLETION AND SUBMITTAL
SECTION 2-1.33A GENERAL
Replace Section 2-1.33A General with the following:

Furnish a bid using blank forms provided in the Bid Documents. Bid must include all forms securely sealed in a suitable envelope and must be signed by the Bidder. Use the forms provided in the Bid Documents except as otherwise specified for a bidder's bond.

Do not fax or email bids. Failure to submit the bid as specified may result in a nonresponsive bid.

If an agent other than the authorized corporate officer or a partnership member signs the bid, file a Power of Attorney with the City either before opening bids or with the bid. Otherwise, the bid may be nonresponsive.

SECTION 2-1.33B ELECTRONIC BIDS
Delete Section 2-1.33B Electronic Bids.

SECTION 2-1.33D BID FORM SUBMITTAL SCHEDULES
SECTION 2-1.33D(1) GENERAL
Replace Section 2-1.33D(1) General with the following:

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-8 5/25/2022
The Bid Document includes forms specific to the Contract. The deadlines for the submittal of the forms vary.

Determine the requirements of the Contract and submit the forms based on the applicable deadline.

Bid forms and information on the form that are due after the time of bid may be submitted at the time of bid.

SECTION 2-1.34 BIDDER’S SECURITY
Replace Section 2-1.34 Bidder’s Security with the following:

Submit one of the following forms of Bidder’s security equal to at least ten percent (10%) of the bid: (i) cash; (ii) cashier’s check; (iii) certified check; or (iv) signed Bidder’s Bond by an admitted surety insurer.

Submit cash, cashier’s check, certified check, or Bidder’s Bond to the City as part of your bid.

The Bidder's Bond must conform to the bond form shown in the Bid Documents for the project and must be properly filled out and executed. The surety’s signature must be notarized and the surety’s power of attorney must be attached. Original signatures are required.

SECTION 2-1.37 BID SUBMITTAL
Add Section 2-1.37 Bid Submittal as follows:

Submit your bid under sealed cover, marked outside of the envelope containing the bid in compliance with the instructions contained in the Notice Inviting Bids. No bid will be considered unless accompanied by Bidder’s security equal to at least ten percent (10%) of the bid in the form of: (i) cash; (ii) cashier’s check; (iii) certified check; or (iv) signed Bidder’s Bond which must comply with Section 2-1.34.

If the bid is made by an individual, the individual’s name and mailing address must be shown. If made by a firm or a partnership, the name and mailing address of each member of the firm or partnership must be shown. If made by a corporation, the bid must show the name of the state under the laws of which the corporation was chartered, and the names, titles and business addresses of the president, secretary and treasurer.

SECTION 2-1.40 BID WITHDRAWAL
Replace Section 2-1.40 Bid Withdrawal with the following:

Bids are not considered filed with the City until the date and time of bid opening.

A Bidder may withdraw or revise a bid after it has been submitted to the City if this is done before the bid opening date and time.

SECTION 2-1.43 BID OPENING
Replace Section 2-1.43 Bid Opening with the following:

The City publicly opens and reads bids at the time and place shown on the Notice Inviting Bids.

SECTION 2-1.46 DEPARTMENT’S DECISION ON BID
Replace Section 2-1.46 Department’s Decision On Bid with the following:

The City's decision on the bid amount is final.

The City may reject:

1. All bids

2. A nonresponsive bid.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-9 5/25/2022
SECTION 2-1.47 BID RELIEF
Replace Section 2-1.47 Bid Relief with the following:

The City may grant bid relief under Pub Contract Code § 5100 et seq. Submit any request for bid relief to the Director within five (5) calendar days after the opening of the bids.

SECTION 2-1.48 RESERVED
Add Section 2-1.48 BID PROTESTS as follows:

1. Any protest of the proposed Project award must be submitted in writing to the City no later than 5:00 PM on the third business day following the date of the bid opening.

2. The protest must contain a complete statement of the basis for the protest.

3. The protest must state the facts and refer to the specific portion of the document or the specific statute that forms the basis for the protest. The protest must include the name, address, and telephone number of the person representing the protesting party.

4. The party filing the protest must concurrently transmit a copy of the protest to the proposed awardee.

5. The party filing the protest must have submitted a bid for the Project. A subcontractor of a party filing a bid for the Project may not submit a bid protest. A party may not rely on the bid protest submitted by another bidder but must timely pursue its own protest.

6. The procedure and time limits set forth in these Instructions to Bidders are mandatory and are the bidders’ sole and exclusive remedy in the event of a bid protest. Any bidder’s failure to fully comply with these procedures shall constitute a waiver of any right to further pursue a bid protest, including filing of a challenge of the award pursuant to the California Public Contract Code, filing of a claim pursuant to the California Government Code, or filing of any other legal proceedings.

7. The City shall review all timely protests prior to award of the Project. The City shall not be required to hold an administrative hearing to consider any protests but may do so at its option. At the time of the City Council’s consideration of the Project award, the City Council shall also consider the merits of any timely protests. The City Council may either reject the protest and award to the lowest responsible bidder or accept the protest and award the bid to the next lowest responsible bidder. Nothing in this section shall be construed as a waiver of the City Council’s right to reject all bids.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-10 5/25/2022
3 CONTRACT AWARD AND EXECUTION
The Bidder's attention is directed to the provisions in Division I, Section 3, Contract Award And Execution, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 3, Contract Award And Execution, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 3-1.04 CONTRACT AWARD
Replace Section 3-1.04 Contract Award with the following:

If the City awards the contract, the City will use best efforts to award the contract to the lowest responsive bid submitted by a responsible Bidder within 90 calendar days after opening of the bids.

SECTION 3-1.04B ADDITIVE/DEDUCTIVE CONTRACT AWARD
Add Section 3-1.04B Additive/Deductive Contract Award as follows:

When the bid proposal form includes additive or deductive alternates, the Engineer will determine the lowest bid as defined in the special provisions. If no method is defined in the special provisions, the lowest bid is determined on the base price without consideration for the prices of the additive or deductive alternates in compliance with Section 20103.8 of the Public Contract Code.

The City reserves the right to award or not award the Contract including or omitting the alternates.

Determination as to whether or not the alternates are included in the Contract will be made by the City.

All requirements in the Contract apply to the work required to complete the alternates.

SECTION 3-1.05 CONTRACT BONDS
Replace Section 3-1.05 Contract Bonds with the following:

Furnish two good and sufficient bonds to the City of Emeryville, California. Each bond must be in the amount equal to one hundred percent of the Total Contract Price. One bond is for payment of claims for labor and materials, and the other bond for faithful performance.

Within ten (10) calendar days from the date the Contractor is notified of award of the Contract, the Contractor shall deliver to the City the bonds required above on the forms supplied by the City. Failure to do so may, in the sole discretion of City, result in the forfeiture of Contractor’s bid security. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City. Any bond signed by an agent must be accompanied by a certified copy of such agent’s authority to act. If the surety on any bond provided by Contractor is declared bankrupt or becomes insolvent or it’s right to do business is terminated in any state where any part of the work is located, Contractor shall, within seven (7) days thereafter, substitute another bond and surety in accordance with the requirements set forth herein. Any alteration or alterations made in the Plans and Specifications which are a part of this Contract or in any provision of this Contract shall not operate to release any surety from liability on any required bond and the consent to make such alterations is hereby given. Any surety on such bonds hereby waives the provisions of Section 2819 of the Civil Code. Bonds must remain in full force during the guaranty period. The required payment and performance bond forms are included in the Bid Documents.

SECTION 3-1.07 INSURANCE POLICIES
Add to Section 3-1.07 Insurance Policies with the following:

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-11 5/25/2022
Procure and maintain, for the duration of the Contract, insurance against claims for injuries to persons, including death or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his Agents, Representatives, Employees, or Subcontractors. The cost of insurance is included in your bid.

All certificates and endorsements are to be received, reviewed and approved by the Engineer before the City will execute the Contract. The City reserves the right to require complete, certified copies of all required insurance policies, at any time.

SECTION 3-1.08 SMALL BUSINESS PARTICIPATION REPORT
Delete Section 3-1.08 Small Business Participation Report.

SECTION 3-1.18 CONTRACT EXECUTION
Replace Section 3-1.18 Contract Execution with the following:

The successful Bidder must execute and deliver to the Engineer the signed Contract, performance and payment bonds, executed guarantee, insurance certificates and endorsements, including certified copies of any and all insurance policies, if requested by the Engineer, Federal W-9 tax Form, and proof of Emeryville Business License.

The Engineer must receive these documents with ten (10) calendar days after the Bidder receives the Contract.

The Bidder’s Bond may be forfeited for failure to execute the Contract and provide the Engineer with all documents within the time specified.

SECTION 3-1.20 CITY BUSINESS LICENSE
Add 3-1.20 City Business License
The Contractor shall obtain a City Business License and for each subcontractor not already so licensed. The cost shall be included in his bid.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-12 5/25/2022
4 SCOPE OF WORK
The Bidder's attention is directed to the provisions in Division I, Section 4, Scope of Work, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 4, Scope of Work, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 4-1.02 INTENT
Add to Section 4-1.02 Intent the following:

All work and materials shall be in full accordance with the latest adopted standards and regulations of the State Fire Marshal; the California Building Code; Title 24 of the California Code of Regulations; the California Electrical Code; the California Plumbing Code; Americans With Disabilities Act; and all other applicable codes, laws, rules or regulations. Nothing in these Contract Documents is to be construed to permit work not conforming to these requirements. The Contractor agrees that immediately upon signing of the Contract, Contractor will diligently review the Contract Documents and determine if any work described or inferred within the Contract Documents is not in conformance with these requirements. Should the Contractor discover work within the Contract Documents not in conformance with these requirements, the Contractor agrees to immediately notify the Engineer in writing of said nonconformance, and to not proceed with nonconforming work. When the work detailed in the Contract Documents differs from governing codes, it is understood and agreed that the Contract sum is based upon the more costly or expensive standard.

The intent of the plans and Specifications is to prescribe the details for the construction and completion of the work which the Contractor undertakes to perform in accordance with the terms of the Contract, and that the work performed under the Contract results in a complete operating system in satisfactory working condition with respect to the functional purposes of the installation, and no extra compensation will be allowed for anything omitted but fairly implied. The prices paid for the various items in the proposal shall include full compensation for furnishing all labor, materials, tools, equipment, overhead, profit, incidentals, and doing all work necessary to complete the finished product as provided in the Contract Documents. Where the plans or Specifications describe portions of the work in general terms, but not in complete detail, it is understood that only the best general practice is to prevail and that only materials and workmanship of the finest quality are to be used. The Contractor shall furnish all labor, materials, tools, equipment, and incidentals, and do all the work involved in executing the Contract to the highest possible standard of workmanship.

Should it appear that the work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained in the Contract Documents, or in the event of any doubt or question arising respecting the true meaning of the Contract Documents, the Contractor shall apply to the Engineer in writing for such further explanations as may be necessary, and the Engineer shall render his or her decisions thereon. The Contractor shall thoroughly review all Requests for Information (RFI's) submitted by subcontractors prior to submission to the Engineer to determine whether such RFI's is already answered in the Contract Documents. The Contractor represents to City, that by submission of an RFI, the Contractor has thoroughly reviewed the RFI and thoroughly reviewed the Contract Documents, and determined that the RFI is not answered or reasonably inferable in the Contract Documents, and that the RFI pertains to an unforeseen condition or circumstance that is not described in the Contract Documents, that there is a conflict or discrepancy in the Contract Documents, or there is an omission in the Contract Documents.

You are responsible to obtain a copy of the Plans, Specifications and current applicable standards and keep them at the job site for reference.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-13 5/25/2022
You must maintain on the job site information on the manufacturer’s recommendation for installation or application when that information exists.

SECTION 4-1.05 CHANGES AND EXTRA WORK
SECTION 4-1.05A GENERAL
Add to Section 4-1.05A General the following:

In instances where you and the City dispute that certain work is extra work or a change in the character of the work, you are responsible to obtain from the Engineer, for the disputed work, agreement on: (i) labor; (ii) materials; and (iii) equipment.

The agreement for disputed work must be on a form provided by City and signed by both parties. Contractor shall maintain and submit these records in compliance with Section 5-1.27. The Agreement for Disputed Work signed by the Engineer does not constitute agreement by the City to pay for disputed work. 4-1.06 DIFFERING SITE CONDITIONS
Add 1.06 D Archaeological Discoveries
Refer to Section 14-2.03 of Standard Specifications
SECTION 4-1.07 VALUE ENGINEERING
Add to Section 4-1.07 Value Engineering as follows:

This section is applicable only as directed in the special provisions.

SECTION 4-1.13A WORK SITE MAINTENANCE
Add Section 4-1.13A Work Site Maintenance as follows:

You agree, by acceptance of a Contract or issuance of permit, to properly maintain the work site in a safe, clean and neat condition at all times.

Prior to the end of each workday you must remove all equipment and construction materials from the public right-of-way and authorized encroachments to private property, except as may be authorized by such permits.

The public right-off-way and encroachments to private property must be clean of any construction materials including but not limited to concrete, oils, asphalt, sand, aggregate, base, construction material packaging.

At the direction of the Engineer, use a self-loading motor street sweeper with spray nozzles to clean the rightof-way. Do not use street sweepers or blowers that use high velocity air to disperse or blow contaminants out of project area. Clean project area and surrounding perimeter including any other area impacted by this work.

Any traffic stripes or pavement markings that are removed or obliterated during work must be replaced with temporary tape, markers, or paint prior to opening the area to traffic. This maintenance and repair responsibility will run for the life of the encroachment and guarantee period. Replace with permanent striping and pavement markings in compliance with Section 84.

SECTION 4-1.13B STOCKPILES
Add Section 4-1.13B Stockpiles as follows:

Keep stockpile materials in the street to a minimum and remove by the end of each work day. Sweeping is required to remove stockpile residue either by hand, or at the direction of the Engineer, by mechanical street sweeper.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-14 5/25/2022
Provisions must be made for controlling dust, arising for whatever reason, from stockpile materials or work on the project. You are responsible for maintaining all stockpile areas in a neat and dust-free condition, with adequate storm water controls. Comply with Section 5-1.20B(4).

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-15 5/25/2022
5 CONTROL OF WORK
The Bidder's attention is directed to the provisions in Division I, Section 5, Control of Work, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 5, Control of Work, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 5-1.01 GENERAL
Replace the 9th paragraph in Section 5-1.01 General with the following:

Whenever you change the normal agreed-to hours of work you must provide 24-hour notice to the Engineer.

The Engineer may or may not approve such a change. If the change is not approved, any work you perform outside the normal hours of work and in the absence of the Engineer will be subject to rejection.

Normal hours of work fall between 7:00 A.M. and 5:00 P.M. Monday through Friday excluding City holidays. Obtain approval from the City for any work between the hours of 5 P.M. and 7 A.M., or on Saturday, Sunday or City holidays pursuant to Chapter 13 of Title 5 of the Emeryville Municipal Code.

SECTION 5-1.02 CONTRACT COMPONENTS
Replace Section 5-1.02 Contract Components with the following:

A component in one contract part applies as if appearing in each. The parts are complementary and describe and provide for complete work. These standard specifications work in conjunction with:

1. project plans;

2. engineering standards;

3. standard plans;

4. manufacturer’s recommendations.

Where materials and methods are specified, details in plans and standards are to be consulted to provide full information needed to complete installations.

If a discrepancy exists, the governing ranking of Contract parts in descending order is:

1. All Approved Contract Change Orders to the Agreement

2. Construction Agreement

3. Notice Inviting Bids

4. Bid or Proposal accepted by the City

5. project special provisions;

6. project plans;

7. Part B General Provisions

8. City engineering standards; Including Greenbook, 2015 Edition Parts 2 through 6

9. City standard specifications;

10. State standard specifications;

11. State standard plans;

12. Written numbers and notes on a drawing govern over graphics;

13. A detail drawing governs over a general drawing;

14. A detail specification governs over a general specification;

15. A Specification in a section governs over a specification referenced by that section.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-16 5/25/2022
Where manufacturer's recommendations for installation are more stringent than those prescribed in the standard specifications or the special provisions, the manufacturer's recommendations will take precedence. This condition may be waived at the discretion of the Engineer.

Working drawings must be submitted in compliance with the provisions in Section 5-1.23.

SECTION 5-1.02B SEQUENCING
Add Section 5-1.02B Sequencing as follows:

Work within any block must be finished and the right-of-way completely restored (including finished pavement) prior to commencing work at any other permitted location or along any other portion of a permitted route. The Engineer may grant exceptions for permitted activities with low impacts to traffic (e.g. directional bore).

SECTION 5-1.09 PARTNERING
Delete Section 5-1.09 Partnering.

SECTION 5-1.12 ASSIGNMENT
Replace Section 5-1.12 Assignment with the following:

The performance of all or any part of the Contract may not be assigned. Further, the right to receive any or all Contract payments may not be assigned.

SECTION 5-1.13 SUBCONTRACTING
SECTION 5-1.13A GENERAL
Replace 5th paragraph in Section 5-1.13A General with the following:

Perform work equaling at least 40 percent of the value of the original total bid with your employees, equipment, rental equipment with operator or rental equipment without operators.

SECTION 5-1.13B DISADVANTAGED BUSINESS ENTERPRISE
Delete Section 5-1.13B Disadvantaged Business Enterprise.

SECTION 5-1.13C DISABLED VETERAN BUSINESS ENTERPRISES
Delete Section 5-1.13C Disabled Veteran Business Enterprises.

SECTION 5-1.13D NON-SMALL BUSINESSES
Delete Section 5-1.13D Non-Small Businesses.

SECTION-1.15 MEANS & METHODS
Add 5-1.15 Means and Methods
The City will not have control over, be in charge of, nor be responsible for construction means, methods, techniques, sequences, or procedures, or for the safety precautions and programs in connection with the work, since these are solely Contractor's responsibility.

The City or adjacent property owner may perform other work adjacent to or within the project area, concurrent with the Contractor's operations. The Contractor shall cooperate fully with the City in all operations which coincide with other work being performed and provide City with such scheduling and other information as may be required by the City to perform such other work. The Contractor shall conduct operations to minimize interference with the work of other forces or contractors performing such work. This work performed by a second contractor may include work which is incomplete or in dispute with the Contractor.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-17 5/25/2022
Any disputes or conflicts which may arise between the Contractor and any other forces or contractors retained by the City, causing delays or hindrance to each other, shall be referred to the Engineer for resolution.

The City shall have the right at any time during the progress of this work to take over and place in service any completed or partially completed portion of the work, notwithstanding the time for completion of the entire work or such portions which may not have expired; but such taking possession thereof shall not be deemed an acceptance of any of the work, nor work on those portions not completed in accordance with the Contract Documents.

SECTION 5-1.16 REPRESENTATIVE
Add to Section 5-1.16 Representative with:

If such project superintendent is not present, the City may deduct from the contract price an amount equivalent to the reasonable hourly rate for a superintendent for each hour or fraction thereof such person is not present on the project site.

SECTION 5-1.17 CHARACTER OF WORKERS
Add to Section 5-1.17 Character of Workers the following:

If in the opinion of the Engineer, any person associated with the Project including but not limited to an employee of the Contractor fails, to comply with Contract provisions after receiving either written or oral notification, at the discretion of the Engineer, that person must not again be employed on the work or project.

SECTION 5-1.18 CHANGE DUE TO MATERIALLY DIFFERENT CONDITIONS Add 5-1.18 Change Orders Due To Materially Different Conditions If any of the conditions set forth in Sections 5-1.16 "Hazardous Waste in Excavation" and 5-1.17 "Trenching Conditions" above, are encountered, the City will promptly investigate the conditions, and if it finds that (1) the conditions do materially differ, or do involve hazardous waste, and (2) cause a decrease or increase in the contractor's cost of, or the time required for, performance of any part of the work, the City will issue a change order under the procedures described in the Standard Specifications Section 4-1.03.

In the event that a dispute arises between the City and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the contractor's cost of, or time required for, performance of any part of the work, the Contractor shall not be excused from any scheduled completion date provided for by this Contract, but shall proceed with all work to be performed under this Contract. The Contractor shall retain any and all rights provided under law which pertain to the resolution of disputes and protests between the contracting parties.

SECTION 5-1.20B PERMITS. LICENSES, AGREEMENTS, AND CERTIFICATIONS SECTION 5-1.20B(3) AFTER AWARD
Add to Section 5-1.20B(3) After Award as follows:

Contractor is required to prepare and Submit a Waste Management Plan. On-line Plan Prep Tools are available at www.emeryville.wastetracking.com. Paper Plan Prep tool are available at http:///emeryville.org/DocumentCenter/View/10133. As of August, 2018 online tools cost 1/3 of the paper tools cost.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-18 5/25/2022
SECTION 5-1.20B(4) CONTRACTOR–PROPERTY OWNER AGREEMENT
Add to Section 5-1.20B(4) Contractor–Property Owner Agreement as follows:

Obtain approval of City Engineer of a Construction Stormwater Pollution Prevention Plan in accordance with Article 3, Chapter 13, Title 6 of the City of Emeryville Municipal Code, and any permit that may be required in accordance with Chapter 5, Title 7 of the City of Emeryville Municipal Code, for the stockpiling of materials in the City. Dispose of all materials not used in work in a legal manner.

Prior to use, furnish the Engineer evidence that properties have required permits, licenses and clearances to be a temporary storage site for stockpiling.

SECTION 5-1.20B(5) COMPLY WITH LOCAL, STATE AND FEDERAL REGULATIONS Add Section 5-1.20B(5) Comply with Local, State and Federal Regulations as follows:

You are responsible to comply with all local, state and federal rules, regulations and statutes as it relates to the work under the Contract in compliance with the Contract Documents.

Should you fail to meet the requirements of a permit or rule, regulation or statute as it pertains to work under the Contract, and the City has notice of an impending fine or mitigation measure to be levied or imposed against the City, the City may withhold payment or portions of payment in compliance with Section 9-1.16E in an amount sufficient to satisfy any fine or mitigation measure that may be levied or imposed on the City in addition to any other retention held.

SECTION 5-1.20G CITY AUTHORIZATIONS AND PERMITS
Add Section 5-1.20G City Authorizations and Permits as follows:

If you desire to discharge to the sanitary sewer, you must receive prior permission from the East Bay Municipal Utility District (EBMUD) Wastewater Collection Supervisor and the City. Flushing waterlines must comply with Section 77-3.

If permission to discharge requires an Industrial User Discharge Permit, you must submit an Industrial User Discharge Permit Application to EBMUD’s Wastewater Collection Supervisor and the City Environmental Programs Manager. You must comply with all conditions of the issued permit and pay all applicable fees. Maintain proof of authorization to discharge at the job site at all times and provide that information to Engineer upon request.

An Alameda County Fire Protection District (a.k.a. Fire Department) permit is required prior to crossing any liquid petroleum or high-pressure gas main. If a prior encroachment conflicts with the proposed work, you must arrange for any necessary removal or relocation with the prior permittee. Any such removal or relocation will be at no expense to the City.

Before using explosives in work, you must receive authorization from the Engineer and obtain a permit for use from the Alameda County Fire Protection District (a.k.a. Fire Department). You may also be required to increase the amount of insurance coverage if, in the opinion of the Engineer, your insurance does not include sufficient coverage for use of explosives.

SECTION 5-1.23 SUBMITTALS
SECTION 5-1.23A GENERAL
Replace Section 5-1.23A General with the following:

Submittals are required for (i) materials and equipment not specified by standards, or a trade name and number, (ii) for working drawings. Submittals are also required when specified in the contract documents, and Regulatory Requirements.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-19 5/25/2022
Where products are clearly identified by standards or trade names and no substitution is proposed, no submittal is required.

Submit adequate descriptive information, from which the Engineer can determine if the proposed (i) materials, (ii) equipment, or (iii) working drawings are in compliance to the design concept and in compliance with the contract documents. Submittal must consist of (i) drawings, (ii) specifications, (iii) calculations, (iv) descriptive data, (v) certificates, (vi) samples, (vii) MSDS sheets, (viii) test results, and (ix) information required in the specifications.

Submittal will be reviewed for general compliance with the design concept and general compliance with the information given in the contract documents. Submittals will not be reviewed for (i) quantities, (ii) dimensions, (iii) coordination with the work of other trades, or (iv) construction safety precautions, all of which are your sole responsibility. Review of a specific item does not indicate acceptance of an assembly of which the item is a component. The Engineer and contract designer are not required to review and will not be responsible for any deviations from the contract documents not clearly noted. Partial submittals and partial grouped submittals will not be reviewed.

SECTION 5-1.23A(1) COORDINATION
Add Section 5-1.23A(1) Coordination as follows:

Submittals must be furnished by you to the Engineer. You must coordinate, compile and submit all required submittals from suppliers and subcontractors to the Engineer. All communications between you and a contract designer must be written and submitted to the Engineer to furnish to contract designer.

SECTION 5-1.23A(2) ORGANIZATION
Add Section 5-1.23A(2) Organization as follows:

Submittals must be accompanied with a transmittal. Contractor and City shall coordinate regarding an appropriate and acceptable indexing system to accompany transmittals.

SECTION 5-1.23D DEVIATION FROM CONTRACT
Add Section 5-1.23D Deviation from Contract as follows:

If you propose to provide any material, equipment or working drawings which deviates from the contract requirements, indicate this on the transmittal form accompanying the submittal. In the transmittal provide a brief description of submittal and why the deviation is requested and compare the material, coatings, mechanical functions, energy efficiency and warranty differences between the material specified and the material submitted.

SECTION 5-1.23E SUBMITTAL COMPLETENESS
Add Section 5-1.23E Submittal Completeness as follows:

Submittals which do not contain all the information required to allow the Engineer to make a determination as to the submittal’s acceptability and compliance with the project documents, will be returned without a complete review.

A resubmittal must be made.

SECTION 5-1.23F SUBMITTAL PACKAGE
Add Section 5-1.23F Submittal Package as follows:

Group submittals are to be made to expedite the review process and to reduce the likelihood of conflicts among submittals. Submittals for various items must be made as a single submittal when the items taken together constitute a manufacturer's package or are so functionally related that expediency indicates checking or review of the group or package as a whole. Conversely, various items which are not functionally related must be submitted separately.

Submittal packages which are not appropriately grouped will be returned without review. Provide one complete DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-20 5/25/2022
portable document format (PDF) file of each submittal to the Engineer. If you are unable to provide electronic documents, provide two complete copies of each submittal to the Engineer. The Engineer will retain one copy of the submittal and make good faith efforts to return one package to you within three weeks. Submittals that require review by a City consultant designer will require one additional copy of the submittal as well as one additional week of review time. Submittals that require review by an outside agency or utility company will require one additional copy of the submittal and additional review time as determined by the outside agency or utility company.

SECTION 5-1.23G RETURNED SUBMITTALS
Add Section 5-1.23G Returned Submittals as follows:

Returned submittals will indicate one of the following actions.

1. No Exceptions Taken – The review indicates that the material, equipment, or work method is in compliance with the design concept and complies with the contract documents. You may begin implementing the work method or incorporate the material or equipment covered by the submittal.

2. Make Corrections Noted – The review indicates limited corrections are required to the submittal in order for the material, equipment, or work method to be in compliance with the design concept and to comply with the contract documents. You may begin implementing the work method or incorporating the material and equipment covered by the submittal in compliance with the noted corrections. Where submittal information will be incorporated in Operation and Maintenance data, a corrected copy must be provided.

3. Revise and Resubmit – The review indicates that the submittal is insufficient or contains incorrect data. Except at your own risk, you may not undertake work covered by this submittal until it has been revised, resubmitted and returned marked either "No exceptions taken" or "Make corrections noted."

4. Rejected – The review indicates that the material, equipment, or work method is not in compliance with the design concept and not in compliance with the contract documents. Except at your own risk, you may not undertake the work covered by such submittals until a new submittal is made and returned marked either "No exceptions taken" or "Make corrections noted."

5. Information Only – The review indicates that the submittal contains contract required information.

SECTION 5-1.23H RESPONSIBILITY
Add Section 5-1.23H Responsibility as follows:

Review of working drawings or submittals does not relieve Contractor of responsibility for errors and does not indicate an assumption of risks or liability by the City, or by any officer or employee of City, or by any consulting firm conducting the review on behalf of the City and Contractor shall have no claim under the Contract on account of the failure, or partial failure, of the method of work, material or equipment reviewed. A mark of "No exceptions taken" or "Make corrections noted" means that the City has no objection to you using the plan, method of work proposed or providing the materials or equipment proposed.

SECTION 5-1.23I CHARGES FOR THIRD PARTY SUBMITTAL REVIEW Add Section 5-1.23I Charges for Third Party Submittal Review as follows:

The Engineer will allow up to two reviews of each submittal. If Contractor is required to make a third or subsequent submittal for any item, then the costs of the additional reviews will be at Contractor’s expense. The cost of the review will be deducted from payments due. The cost of the review by contract professional services will be on a time and materials basis at standard company billing rates. Billing for this expense will be in compliance with Section 9-1.23.

SECTION 5-1.26 CONSTRUCTION SURVEYS
Replace Section 5-1.26 Construction Surveys with the following:
5-1.26A General
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-21 5/25/2022
Contractor must provide the necessary horizontal and vertical survey control for the completion of the work.

Survey work must be performed by a Licensed Land Surveyor or a Registered Civil Engineer.

Control must be provided for site grading, significant layout, or as directed by the Engineer. Control must be provided in the same system of units as shown. Contractor must provide surface grade control every 50 feet and at grade breaks and begin and end of curves. Contractor must mark the control points in the field and provide a printed sheet with the point information, site layout, and control point layout to the Engineer. 5-1.26B Payment
Full compensation for work specified in Section 5-1.26A and applicable engineering standards is included in the payment for other bid items unless a bid item of work is shown on the bid item list.

SECTION 5-1.27E CHANGE ORDER BILLS
Replace Section 5-1.27E Change Order Bills with the following:

Contractor must deliver all Change Order Bills and support documents and disputed work daily agreements in writing to the Engineer. A Change Order Bill will not be accepted by the Engineer unless prior approval for the work has been given. A change order is approved when Contractor and the Engineer have each approved it in writing.

SECTION 5-1.32 AREAS FOR USE
Add to Section 5-1.32A Areas for Use the following:

Personal vehicles of contractor employees, construction equipment, and the contractor’s vehicle must be parked in areas approved by the Engineer.

SECTION 5-1.36 PROPERTY AND FACILITIES PRESERVATION
SECTION 5-1.36A GENERAL
Add to Section 5-1.36A General the following:

12. Infrastructure

13. street surfacing

14. traffic stripes

15. pavement markings and markers

16. survey monuments

17. bench marks

18. utilities

19. trees

20. traffic signal equipment including interconnecting conductors

21. other public fixtures

22. EV charging stations and related conduit.

Contractor shall comply with California Government Code § 4216 et seq. Contractor shall notify the Engineer at least 3 business days before Contractor contacts the regional notification center. Failure to contact the notification center prohibits excavation.

Restore facilities in kind in compliance with appropriate specifications, standards, and plans.

Monuments and bench marks must comply with Section 5-1.36.

Where trees or tree roots are present in the work area, tree protection must comply with Section 77-1.03A(2)(g) and Chapter 2 and Chapter 7 of Title 7 of the Emeryville Municipal Code.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-22 5/25/2022
The Engineer reserves the right to require you to video inspect any storm drain or sanitary sewer service line or mainline suspected of damage by your operation. The Engineer may require a video inspection of the damaged facility. Provide written notification to the property owner, with a copy to the Engineer, prior to any modification, repair or replacement of the damaged facility which, in the case of a damaged sanitary sewer service line or mainline, shall all be conducted in compliance with Chapter 8 of Title 7 of the Emeryville Municipal Code.

Damage to property and facilities must be reported immediately to the Engineer.

Prior to beginning work Contractor shall determine the location of any underground facilities. Contractor shall contact Underground Service Alert at 811 and request all utility lines to be marked.

SECTION 5-1.36A(1) TRENCHLESS OPERATIONS
Add Section 5-1.36A(1) Trenchless Operations as follows:

When any trenchless method is used to install or repair a utility, all pressurized utility lines and sewer laterals that will be crossed must be pot-holed. Other State or Federal requirements may apply. When completing work by a directional bore, Contractor must field locate and verify the condition, type of material and depth of all service lines and mainlines to be crossed.

If the bore will provide at least 3 feet of clearance from sewer laterals, field locating of sewer laterals may be waived by the Engineer.

SECTION 5-1.36B LANDSCAPE
Add to Section 5-1.36B Landscape as follows:

Contractor shall repair minor damage to turf by top dressing to create an even grade with amended topsoil and seeding with an approved seed mix. Damage to turf in excess of 100 square feet may be required to be replaced with sod in City’s sole discretion.
5-1.36C Railroad Property
Add to Section 5-1.36C.

If the Contract does not include an agreement with a railroad company, do not allow personnel or equipment on railroad property. Prevent material, equipment, and debris from falling onto railroad property.

SECTION 5-1.36D NONHIGHWAY FACILITIES
Replace Section 5-1.36D Nonhighway Facilities with the following:

Before starting work that could damage or interfere with underground infrastructure, locate the infrastructure described in the Contract, including laterals and other appurtenances, and determine the presence of other underground infrastructure inferred from visible facilities, such as buildings, meters, and junction boxes.

Underground infrastructure described in the Contract may be in different locations from those described, and additional infrastructure may exist.

Upon discovering an underground main or trunk line not described in the Contract, immediately notify the Engineer and the infrastructure owner. If the Engineer orders the locating and protecting of the infrastructure, then the locating and protecting of the infrastructure is change order work. If ordered, Contractor shall repair infrastructure damage. If the damage is not due to Contractor’s negligence, the repair is change order work.

Immediately notify the Engineer of a delay due to the presence of main-line underground infrastructure not described in the Contract or in a substantially different location.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-23 5/25/2022
Notify the Engineer if the infrastructure described in the Contract cannot be found. If after giving the notice, Contractor finds the infrastructure in a substantially different location from that described, efforts of Contractor to find the infrastructure is change order work.

The City may rearrange a nonhighway facility during the Contract. Rearrangement of a nonhighway facility includes installation, relocation, alteration, or removal of the facility.

The City may authorize facility owners and their agents to enter the highway to perform rearrangement work for their facilities or to make connections or repairs to their property. Coordinate activities to avoid delays. If necessary rearrangement of underground infrastructure is not described in the Contract, the Engineer may order Contractor to perform the work. The rearrangement is change order work.

Immediately notify the Engineer of a delay due to a rearrangement different from that described in the Contract.

If Contractor wants infrastructure rearrangement different from that described in the Contract, Contractor shall notify the Engineer, make an arrangement with the infrastructure owner, obtain authorization for the rearrangement from the Engineer and pay the infrastructure owner any additional cost.

The City does not adjust time or payment for a rearrangement different from that described in the Contract.

SECTION 5-1.36E SURVEY MONUMENTS
Add to Section 5-1.36E Survey Monuments as follows:

Contractor shall protect all survey monuments on and off the highway.

All survey and construction, maintenance or other work must be performed consistent with Section 8725 and 8771 of the California Business & Professions Code. Monuments and bench marks must be set by a Licensed Land Surveyor or a Registered Civil Engineer properly licensed to complete survey work. The City reserves the right to review the Land Surveyor or Engineer's license to determine its validity.

Sufficient controlling monuments shall be retained or replaced in their original positions to enable property, right-of-way and easement lines, property corners, and subdivision and tract boundaries to be reestablished.

Anything that appears to be a monument or benchmark must be reported to the Engineer prior to construction or disturbance. A Licensed Land Surveyor must locate and reference known monuments or benchmarks that will be disturbed by construction activities. A corner record shall be filed with the County prior to construction for any monument or benchmark that will be disturbed by construction. The corner record must detail the location of the monument and any tie-outs. Should the existing survey monument be disturbed or destroyed during construction, it must be reset at the previous location. All tie-outs must be removed after the original monument is re-established. Should any existing bench mark be disturbed or destroyed during construction, a new one must be set at a nearby, but different, location than the existing, as determined by the Engineer prior to construction. For monuments, a corner record must be filed with the County and a copy delivered to the Engineer before and after construction. For bench marks, documentation of the transferred bench mark, including a location map, field notes and surveyor certification, must be delivered to the Engineer prior the project acceptance. Damaged or disturbed property corners must be replaced by a Land Surveyor at the contractor’s or owner’s expense.

Upon discovery of a survey monument not identified and located immediately stop work near the monument and notify the Engineer. Do not resume work near the monument until authorized by the Engineer.

SECTION 5-1.38 MAINTENANCE AND PROTECTION RELIEF
Add to Section 5-1.38 Maintenance and Protection Relief as follows:

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-24 5/25/2022
However, nothing in this Section 5-1.38 providing for relief from maintenance and responsibility will be construed as relieving Contractor of full responsibility for correcting any defective work or materials found at any time.

SECTION 5-1.39 DAMAGE REPAIR AND RESTORATION
SECTION 5-1.39A GENERAL
Add to Section 5-1.39A General as follows:

Contractor must immediately repair or install approved alternate to any facility missing, damaged or non-operational as a result of its work, prior to continuing with the other Contract work. If the repairs are not made as required, Contractor agrees to the cost of those repairs made by others at the City’s direction in compliance with Section 9-

1.23. SECTION 5-1.39C LANDSCAPE DAMAGE
SECTION 5-1.39C(1) GENERAL
Add to the end of the 1st paragraph of Section 5-1.39C(1) General as follows:
or permanent erosion control establishment.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-25 5/25/2022
6 CONTROL OF MATERIALS
The Bidder's attention is directed to the provisions in Division I, Section 6, Control of Materials, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 6, Control of Materials, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 6-1.04 BUY AMERICA
Add to Section 6-1.04 Buy America as follows:

This section is applicable only as directed in the special provisions.

SECTION 6-1.05 SPECIFIC BRAND OR TRADE NAME AND SUBSTITUTION Replace Section 6-1.05 Specific Brand Or Trade Name And Substitution with the following:

Whenever the specifications permit the substitution of a similar or equivalent material or article, no tests or action relating to the approval of the substitute material will be made until Contractor’s request for substitution is made in writing accompanied by complete data as to the equality of the material or article proposed. The request must be made a minimum of ten working days prior to the bid opening date identified in the Notice to Bidders.

Substitutions requested after bid opening must be made in ample time to permit approval without delaying the work. Requests for substitutions must comply with Section 5-1.23.

Any substitutions that are approved must be furnished without additional cost to the City. If any changes are required for the proper installation and fit of alternative materials or equipment, or because of deviations from the contract plans and specifications, such changes must not be made without the consent of the Engineer and must be made without additional cost to the City.

SECTION 6-2 QUALITY ASSURANCE
SECTION 6-2.01 GENERAL
SECTION 6-2.01A GENERAL
Modify table in 7th paragraph regarding California Test for Relative compaction with the following:

Testing method for Relative Compaction is:

1. ASTM D-1557

2. ASTM D-2922

3. ASTM D-3017
SECTION 6-2.01B AUTHORIZED FACILITY AUDIT LISTS
Delete Section 6-2.01B Authorized Facility Audit Lists.

SECTION 6-2.01C AUTHORIZED MATERIAL LISTS
Delete Section 6-2.01C Authorized Material Lists.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-26 5/25/2022
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
The Bidder's attention is directed to the provisions in Division I, Section 7, Legal Relations And Responsibility To The Public, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 7, Legal Relations And Responsibility To The Public, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 7-1.02I(2) NONDISCRIMINATION
Replace Section 7-1.02I(2) Nondiscrimination with the following:

Under 2 CA Code of Regs § 11105:

1. During the performance of this contract the recipient, contractor, and its subcontractors shall not deny the contract's benefits to any person on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status, nor shall they discriminate unlawfully against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status. Contractor shall insure that the evaluation and treatment of employees and applicants for employment are free of such discrimination.

2. Contractor shall comply with the provisions of the Fair Employment and Housing Act (Gov. Code, § 12900 et seq.), the regulations promulgated thereunder (Cal. Code Regs., tit. 2, § 11000 et seq.), the provisions of Article 9.5, Chapter 1, Part 1, Division 3, Title 2 of the Government Code (Gov. Code, §§ 11135-11139.5), and the regulations or standards adopted by the awarding state agency to implement such article.

3. Contractor or recipient shall permit access by representatives of the Department of Fair Employment and Housing and the awarding state agency upon reasonable notice at any time during the normal business hours, but in no case less than 24 hours' notice, to such of its books, records, accounts, and all other sources of information and its facilities as said Department or Agency shall require to ascertain compliance with this clause.

4. Recipient, contractor and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement.

5. The contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the contract.

Under 2 CA Code of Regs § 11122:

STANDARD CALIFORNIA NONDISCRIMINATION CONSTRUCTION CONTRACT SPECIFICATIONS (GOV. CODE SECTION 12990)
These specifications are applicable to all state contractors and subcontractors having a construction contract or subcontract of $5,000 or more.

1. As used in the specifications:
a. "Act" means the Fair Employment and Housing Act.
b. "Administrator" means Administrator, Office of Compliance Programs, California Department of Fair Employment and Housing, or any person to whom the Administrator delegates authority;

2. Whenever the contractor or any subcontractor subcontracts a portion of the work, it shall include in each subcontract of $5,000 or more the nondiscrimination clause in this contract directly or through incorporation by reference. Any subcontract for work involving a construction trade shall also include the Standard California Construction Contract Specifications, either directly or through incorporation by DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-27 5/25/2022
reference.

3. The contractor shall implement the specific nondiscrimination standards provided in paragraphs 6(a) through (e) of these specifications.

4. Neither the provisions of any collective bargaining agreement, nor the failure by a union with whom the contractor has a collective bargaining agreement, to refer members of any group protected by the Act shall excuse the contractor's obligations under these specifications, Government Code section 12990, or the regulations promulgated pursuant thereto.5. In order for the nonworking training hours of apprentices and trainees to be counted, such apprentices and trainees must be employed by the contractor during the training period, and the contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities.

Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor or the California Department of Industrial Relations.

5. In order for the nonworking training hours of apprentices and trainees to be counted, such apprentices and trainees must be employed by the contractor during the training period, and the contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities. Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor or the California Department of Industrial Relations.

6. The contractor shall take specific actions to implement its nondiscrimination program. The evaluation of the contractor's compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The contractor must be able to demonstrate fully its efforts under steps a. through e. below:
a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and at all facilities at which the contractor's employees are assigned to work. The contractor shall specifically ensure that all foremen, superintendents, and other on-site supervisory personnel are aware of and carry out the contractor's obligations to maintain such a working environment. b. Provide written notification within seven days to the director of the DFEH when the referral process of the union or unions with which the contractor has a collective bargaining agreement has impeded the contractor's efforts to meet its obligations. c. Disseminate the contractor's equal employment opportunity policy by providing notice of the policy to unions and training, recruitment and outreach programs and requesting their cooperation in assisting the contractor to meet its obligations; and by posting the company policy on bulletin boards accessible to all employees at each location where construction work is performed. d. Ensure all personnel making management and employment decisions regarding hiring, assignment, layoff, termination, conditions of work, training, rates of pay or other employment decisions, including all supervisory personnel, superintendents, general foremen, on-site foremen, etc., are aware of the contractor's equal employment opportunity policy and obligations, and discharge their responsibilities accordingly.
e. Ensure that seniority practices, job classifications, work assignments, and other personnel practices, do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the equal employment opportunity policy and the contractor's obligations under these specifications are being carried out.

7. Contractors are encouraged to participate in voluntary associations that assist in fulfilling their equal employment opportunity obligations. The efforts of a contractor association, joint contractor-union, contractor-community, or other similar group of which the contractor is a member and participant, may be asserted as fulfilling any one or more of its obligations under these specifications provided that the contractor actively participates in the group, makes every effort to assure that the group has a positive impact on equal employment opportunity in the industry, ensures that the concrete benefits of the program are reflected in the contractor's workforce participation, and can provide access to documentation that demonstrates the effectiveness of actions taken on behalf of the contractor. The obligation to comply, however, is the Contractor's.

8. The contractor is required to provide equal employment opportunity for all persons. Consequently, the contractor may be in violation of the Fair Employment and Housing Act (Government Code section 12990 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-28 5/25/2022
et seq.) if a particular group is employed in a substantially disparate manner.

9. The contractor shall not use the nondiscrimination standards to discriminate against any person because race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status.

10. The contractor shall not enter into any subcontract with any person or firm decertified from state contracts pursuant to Government Code section 12990.

11. The contractor shall carry out such sanctions and penalties for violation of these specifications and the nondiscrimination clause, including suspension, termination and cancellation of existing subcontracts as may be imposed or ordered pursuant to Government Code section 12990 and its implementing regulations by the awarding agency. Any contractor who fails to carry out such sanctions and penalties shall be in violation of these specifications and Government Code section 12990.

12. The contractor shall designate a responsible official to monitor all employment related activity to ensure that the company equal employment opportunity policy is being carried out, to submit reports relating to the provisions hereof as may be required by OCP and to keep records. Records shall at least include for each employee the name, address, telephone numbers, construction trade, union affiliation if any, employee identification number when assigned, status, (e.g., mechanic, apprentice trainee, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in any easily understandable and retrievable form; however, to the degree that existing records satisfy this requirement, contractors shall not be required to maintain separate records.

SECTION 7-1.02K LABOR CODE
SECTION 7-1.02K(1) GENERAL
SECTION 7-1.02K(2) WAGES
SECTION 7-1.02K(3) CERTIFIED PAYROLL RECORDS (LABOR CODE §1776) Replace Section 7-1.02K(1) General, Section 7-1.02K(2) Wages, and Section 7-1.02K(3) Certified Payroll Records (Labor Code §1776) with the following:

Work on the job site must comply with Labor Code §1720 et seq. and 8 CA Code of Regulations §16000 et seq.

Work includes roadside production and processing of materials and hauling and delivery of ready-mix concrete.

1. LABOR CODE REQUIREMENTS. In the performance of this Contract, Contractor’s attention is directed to the following requirements of the Labor Code:

A. Hours of Labor. Eight hours labor constitutes a legal day’s work. Contractor shall forfeit, as penalty to City, $25 for each worker employed in the performance of the Contract by Contractor or by any subcontractor under it for each calendar day during which such worker is required or permitted to work more than eight hours in any one day and 40 hours in any one calendar week in violation of the provisions of the California Labor Code and in particular, Sections 1810 to 1815, inclusive. Work performed by employees of the Contractor in excess of eight hours per day and 40 hours during any one week shall be permitted upon compensation for all hours worked in excess of eight hours per day at not less than one-and-one-half times the basic rate of pay, as provided in Section 1815.

B. Prevailing Wages. Contractor shall comply with California Labor Code Sections 1770 to 1780, inclusive. In accordance with Section 1775, the Contractor shall forfeit as a penalty to City an amount as determined by the Labor Commissioner not to exceed $200 for each calendar day or portion thereof for each worker paid less than stipulated prevailing wage rates for such work or craft in which such worker is employed for any work done under the contract by him or by any subcontractor under it in violation of the revisions of the Labor Code and in particular, Labor Code Sections 1770 to 1780, inclusive. In addition to said penalty and pursuant to Section 1775, the difference between such stipulated prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the stipulated prevailing wage rate shall be paid to each worker by Contractor. Pursuant to the provisions of Section 1773 of DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-29 5/25/2022
the Labor Code, the City has obtained the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work applicable to the work to be done from the Director of the Department of Industrial Relations. Copies of the prevailing wage rates are on file at the City and are available for review upon request. Pursuant to §1773.2 of the Labor Code, the Contractor shall post general prevailing wage rates at a prominent place at the site of the work.

C. Payroll Records. Effective January 1, 2016, Contractor and each subcontractor shall submit electronic certified payroll records to the California Labor Commissioner in the manner and format set forth in California Labor Code Section 1771.4. The Contractor's attention is directed to the following provisions of Labor Code Section 1776. The Contractor shall be responsible for the compliance with these provisions by his subcontractors.
(a) Each contractor and subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work.

Submitted certified payrolls for hauling and delivering ready-mixed concrete and other offsite batch mixed materials must be accompanied by a written time record. The time record must include:

1. Truck driver's full name and address

2. Name and address of the factory or batching plant

3. Time the concrete was loaded at the factory or batching plant

4. Time the truck returned to the factory or batching plant • Truck driver's signature certifying under penalty of perjury that the information contained in this written time record is true and correct
(b) The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of the Contractor on the following basis:
(i) A certified copy of an employee's payroll record shall be made available for inspection or furnished to such employee or his or her authorized representative on request. (ii) A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection or furnished upon request to the City, the Division of Labor Standards Enforcement and the Division of Apprenticeship Standards of the Department of Industrial Relations.
(iii) A certified copy of all payroll records enumerated in subdivision (a) shall be made available upon request to the public for inspection or copies thereof made; provided, however, that a request by the public shall be made through either the City, the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph (2), the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the Contractor, subcontractor and the entity through which the request was made. The public shall not be given access to such records at the principal office of the Contractor.
(c) The certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as the forms provided by the Division. (d) The Contractor shall file a certified copy of the records enumerated in subdivision (a) with the entity that requested such records within ten (10) days after receipt of a written request.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-30 5/25/2022
(e) Any copy of records made available for inspection as copies and furnished upon request to the public or the City, the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement shall be marked or obliterated in such a manner as to prevent disclosure of an individual's name, address and social security number. The name and address of the Contractor shall not be marked or obliterated.
(f) The Contractor shall inform the City of the location of records enumerated under subdivision (a), including the street address, city and City, and shall, within five working days, provide a notice of a change of location and address.
(g) In the event of noncompliance with the requirements of this Section, the Contractor shall have ten (10) days in which to comply subsequent to receipt of written notice specifying in what respects such contractor must comply with this Section. Should noncompliance still be evident after such 10- day period, the Contractor shall, as a penalty the State or the City, forfeit One Hundred Dollars ($100) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The penalties specified in subdivision (g) of Labor Code Section 1776 for noncompliance with the provisions of said Section 1776 may be deducted from any monies due or which may become due to the Contractor. (h) The Contractor and each subcontractor shall preserve their payroll records for a period of three (3) years from the date of completion of the Contract.

D. Labor Non-discrimination. Attention is directed to Section 1735 of the Labor Code which provides that Contractor shall not discriminate against any employee or applicant for employment because of race or color, religion, physical or mental disability, national origin or ancestry, medical condition, marital status or sex of such persons, except as provided in Section 12940 of the Government Code. Contractor further agrees to include a similar provision in all subcontracts, except subcontracts for standard commercial supplies or raw materials.

E. Apprentices. The Contractor and all subcontractors shall comply with the requirements of California Labor Code Sections 1777.5, 1777.6 and 1777.7 regarding the employment and of apprentices.

F. Workers' Compensation. Pursuant to the requirements of Section 1860 of the California Labor Code, the Contractor will be required to secure the payment of workers' compensation to its employees in accordance with the provisions of Section 3700 of the Labor code.

Prior to commencement of work, the Contractor shall sign and file with the City, a certification in the following form:
"I am aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract."
Said certification is included in the Contract, and signature and return of the Contract as provided in Section G3.03, "Execution of Contract," of the General Conditions, shall constitute signing and filing of the said certificate.

SECTION 7-1.02K(6) OCCUPATIONAL SAFETY AND HEALTH STANDARDS SECTION 7-1.02K(6)(B) EXCAVATION SAFETY
Add to Section 7-1.02K(6)(b) Excavation Safety as follows:

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-31 5/25/2022
Comply with Labor Code 6705 and 6707. Comply with Public Contracts Code 7104.

SECTION 7-1.02L PUBLIC CONTRACT CODE
SECTION 7-1.02L(1) GENERAL
Replace Reserved in Section 7-1.02L(1) General with the following:

1. CLAIMS PROCEDURES. Compliance with all change order procedures is a prerequisite to filing a Public Contract Code Claim pursuant to this Section. Claims must be submitted no later than (a) 30 days after the dispute resolution process set forth in Section 5-1.43 is complete or (b) 30 days after the occurrence of the event giving rise to the claim.

In accordance with the procedures set forth in Public Contract Code Sections 9204 and 20104-20104.6, a Contractor may submit a claim by registered or certified mail with return receipt requested, for one or more of the following: (a) a time extension, including, without limitation, for relief from damages or penalties for delay assessed by the City; (b) payment by the City of money or damages arising from work done by, or on behalf of, the Contractor pursuant to this contract and payment for which is not otherwise expressly provided or to which the Contractor is not otherwise entitled; or (c) payment of an amount that is disputed by the City.

The Contractor shall furnish reasonable documentation to support the claim, including but not limited to: 1) a clear, concise recital of the basis upon which the claim is asserted, including a designation of the provisions of the Contract upon which the claim is based, 2) a statement as to the amount of time and/or compensation sought pursuant to the claim; 3) whether the Contractor’s claim arises from an ongoing occurrence, and if so a description of the specific Work activities affected by the claim, 4) a time impact analysis in the event that Contractor requests a time extension, 5) full and complete cost records supporting the amount of any claim for additional compensation, and 6) a notarized certification by the Contractor as follows: “Under the penalty of law for perjury or falsification and with specific reference to the California False Claims Act, Government Code Section 12650 et seq., the undersigned hereby certifies that the information contained herein is a true, accurate and complete statement of all features relating to the claim asserted.” Failure by the Contractor to provide sufficient documentation will result in denial of the claim. The City reserves the right to request additional documentation, or clarification of the documentation provided.

Upon receipt of a claim, the City will conduct a reasonable review and provide a written statement to the Contractor identifying what portion of the claim is disputed and what portion is undisputed within 45 days of receipt of the claim. The City and Contractor may, by mutual agreement, extend the 45 day time period. For any undisputed portion of a claim, the City must make payment within 60 days of its issuance of the written statement.

If the Contractor disputes the City's written statement, or if the City fails to respond, the Contractor may demand an informal conference to meet and confer for settlement of the issues in dispute. The City will then schedule the meet and confer conference within 30 days of the demand. Within 10 business days following the meet and confer conference, the City will provide a written statement identifying the portion of the claim that remain in dispute. Any payment due on an undisputed portion of the claim will be made within 60 days of the meet and confer conference.

After the meet and confer conference, any disputed portion of the claim shall be submitted to nonbinding mediation. Alternatively, upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable. If mediation is unsuccessful, the parts of the claim that remain in dispute shall be subject to applicable procedures set forth below.

Failure of a public entity to respond to a claim within the time periods described above shall result in the claim being deemed rejected in its entirety. Additionally, amounts not paid in a timely manner shall bear interest at 7 percent per year.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-32 5/25/2022
In the event that the mediation is unsuccessful, Contractor must file a government claim pursuant to Government Code Sections 910 et seq. in order to initiate a civil action.

In any civil action filed to resolve claims, the court shall submit the matter to nonbinding mediation within 60 days following the filing or responsive pleading, provided that the parties have not already participated in mediation of the claim as outlined above. If the matter remains in dispute after nonbinding mediation, the court shall submit the matter to judicial arbitration pursuant to Code of Civil Procedure Section 1141.10 et seq.

If the matter remains in dispute after judicial arbitration, the City or the Contractor may request a trial de novo.

2. UTILITY RELOCATION. Pursuant to California Government Code Section 4215, if during the course of the work the Contractor encounters utility installations which are not shown or indicated in the contract plans or in the specifications or which are found in a location substantially different from that shown, and such utilities are not reasonably apparent from visual examination of the work site, then it shall promptly notify the City in writing. Where necessary for the work of the Contract, the City will amend the contract to adjust the scope of work and the compensation to allow the Contractor to make such adjustment, rearrangement, repair, removal, alteration, or special handling of such utility, including repair of the damaged utility. If the Contractor fails to give the notice specified above and thereafter acts without instructions from the City, then it shall be liable for any or all damage to such utilities or other work of the Contract which arises from its operations subsequent to the discovery, and it shall repair and make good such damage at its own cost.

3. PUBLIC WORKS REGISTRATION. The Contractor must be registered with the California Department of Industrial Relations pursuant to Labor Code Section 1725.5. This Contract is subject to monitoring and enforcement by the DIR pursuant to Labor Code Section 1771.4. The Contractor shall furnish the records specified in Labor Code Section 1776 directly to the Labor Commissioner, monthly in a format prescribed by the Labor Commissioner.

4. USE OF SUBCONTRACTORS. Contractor shall not subcontract any work to be performed by it under this Contract without the prior written approval of the City. Contractor shall be solely responsible for reimbursing any subcontractors and City shall have no obligation to them. Attention is directed to the requirements of Sections 4100 to 4113, inclusive, of the California Public Contract Code which are applicable to this Contract.

Each Contractor shall list the name and business address of each subcontractor to whom the Contractor proposes to subcontract a portion of the work in an amount in excess of one-half of one percent (0.5%) of the Total Contract Price, along with a description of the portion of the work which shall be done by each subcontractor, by executing the “List of Subcontractors” form attached to this Contract

5. CONTRACTOR’S LICENSE REQUIREMENTS. Contractor and any approved subcontractors shall hold such current and valid Contractor’s Licenses as required by California Law.

6. NON-COLLUSION DECLARATION. Pursuant to Public Contract Code Section 7106, Contractor shall execute a Non-Collusion Declaration, in a form provided by City, which is attached and incorporated herein.

7. EXCAVATION. If applicable, in accordance with state law (Public Contract Code Section 7104), with respect to any work involving digging trenches or excavations that extend deeper than four feet, the Contractor shall notify the City promptly in writing of any of the following conditions: (a) material that the Contractor believes may be hazardous waste, as defined in California Health and Safety Code Section 25117, that is required to be removed to a Class I, Class II or Class III disposal site in accordance with provisions of existing law; (b) subsurface or latent physical conditions at the site differing from those indicated; (c) unknown physical conditions at the site of any unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract. Contractor shall notify the City of such conditions prior to disturbing them and shall await direction from the City as to how to proceed.

8. TRENCH SAFETY. For all contracts over $25,000, excavation for any trench 5 feet or more in depth shall not begin until the Contractor has received approval from the City, of the Contractor’s detailed plan for DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-33 5/25/2022
worker protection from the hazards of caving ground during the excavation of such trench. Such plan shall be submitted at least 5 days before the Contractor intends to begin excavation for the trench and shall show the details of the design of shoring, bracing, sloping or other provisions to be made for worker protection during such excavation. No such plan shall allow the use of shoring, sloping or a protective system less effective than that required by the Construction Safety Orders of the Division of Industrial Safety; and if such plan varies from the shoring system standards established by the Construction Safety Orders, the plan shall be prepared and signed by an engineer who is registered as a Civil or Structural Engineer in the State of California. Attention is directed to the provisions of Section 6705 of the Labor Code concerning trench excavation safety plans.

9. SOUND CONTROL REQUIREMENTS. The Contractor shall comply with all State and local sound control and voice level rules, regulations and ordinances which apply to any work performed pursuant to the contract.

Each internal combustion engine, used for any purpose on the job or related to the job, shall be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine shall be operated on the project without said muffler.

General construction noise shall be limited to weekdays from 7:00 am to 6:00 pm. Pile Driving and similarly loud activities shall be limited to weekdays from 8:00 am to 5:00 pm.

Pre-construction noise including, but not limited to loading and unloading, cleaning of mechanical toilets, maintenance of vehicles, deliveries, truck idling, backup beeps, yelling and radios, is also limited to the general construction noise hours.

The Director may allow construction noise to occur beyond the general construction noise hours provided a noise waiver is granted pursuant to the Emeryville Municipal Code.

Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore.

10. PRESERVATION OF PROPERTY. Attention is directed to Section 7 1.12, "Indemnification and Insurance," and to Section 8 1.10, "Utility and Non-Highway Facilities." Due care shall be exercised to avoid injury to existing highway improvements or facilities, utility facilities, adjacent property, and roadside trees, shrubs and other plants that are not to be removed.

Roadside trees, shrubs and other plants that are not to be removed, and pole lines, fences, signs, markers and monuments, buildings and structures, conduits, pipelines under or above ground, sewer and water lines, all highway facilities and any other improvements or facilities within or adjacent to the highway shall be protected from injury or damage, and if ordered by the Engineer, the Contractor shall provide and install suitable safeguards, accepted by the Engineer, to protect the objects from injury or damage. If the objects are injured or damaged by reason of the Contractor's operations, the objects shall be replaced or restored at the Contractor's expense. The facilities shall be replaced or restored to a condition as good as when the Contractor entered upon the work, or as good as required by the Specifications accompanying the Contract, if any of the objects are a part of the work being performed under the Contract. The Engineer may make or cause to be made those temporary repairs that are necessary to restore to service any damaged highway facility. The cost of the repairs shall be borne by the Contractor and may be deducted from any moneys due or to become due to the Contractor under the Contract.

11. PAYMENT BOND. For all contracts over $25,000, the successful Bidder shall provide a payment bond in the amount equal to one hundred percent (100%) of the Total Contract Price and issued by a California admitted surety. The payment bond shall provide the City with security for Contractor’s full payment to all subcontractors for costs of materials, equipment, supplies, and labor furnished in the course of the performance DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-34 5/25/2022
of the Contract. Full compensation for furnishing the payment bond is included in the Total Contract Price.

12. RETENTION OF PROGRESS PAYMENTS. The City may retain five percent (5%) of the estimated value of the work done and five percent (5%) of the value of materials estimated to have been furnished and delivered and unused or furnished and stored as part security for the fulfillment of the Contract by the Contractor. Any time after fifty percent (50%) of the work has been completed, if the City finds that satisfactory progress is being made, the City may make any of the remaining progress payments in full for actual work completed in accordance with Public Contract Code Section 9203.

13. SECURITIES IN LIEU OF RETENTION. Pursuant to Public Contract Code Section 22300, the Contractor may elect, in lieu of having progress payments retained by the City, to deposit in escrow with the City, or with a bank acceptable to the City, securities eligible for investment under Government Code Section 16430, bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the Contractor and the City. If the Contractor elects to submit securities in lieu of having progress payments retained by the City, the Contractor shall, at the request of any subcontractor performing more than 5% of the Contractor’s total bid, make the same option available to the subcontractor.

14. PROMPT PAYMENT TO CONTRACTOR. The City will make progress payments within thirty (30) days after receipt of an undisputed and properly submitted progress payment invoice pursuant to Section 20104.50 of the Public Contract Code. No such payment will be made when, in the judgment of the Project Manager, (a) the work is not proceeding in accordance with the provisions of the Contract; (b) the Contractor is not complying with the requirements of the Contract; or (c) when the total value of the work done as shown on the invoice does not exceed Three Hundred Dollars ($300.00). No such invoice or payment will be construed to be an acceptance of any work or materials. Before any progress payment or the final payment is made, the Contractor may be required to submit satisfactory evidence that he is not delinquent in payments to its employees, subcontractors, suppliers or other creditors for labor and materials incorporated into the work.

Pursuant to Public Contract Code Section 20104.50, if the City fails to make a progress payment in a timely manner, it shall pay interest to the Contractor at the legal rate set forth in Section 685.010(a) of the California Code of Civil Procedure.

15. PROHIBITION AGAINST CONTRACTING WITH DEBARRED SUBCONTRACTORS. Contractor is prohibited from performing work on a public works project with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code.

16. THIRD-PARTY CLAIMS. Pursuant to Public Contracts Code Section 9201, City shall have full authority to compromise or otherwise settle any claim relating to the Contract at any time. City shall provide for timely notification to Design-Builder of the receipt of any third-party claim, relating to the contract. Notice shall be in writing and will be provided within thirty (30) days.

17. IRAN CONTRACTING ACT. The undersigned Bidder certifies that it is not, at the time of bidding, on the California Department of General Services (DGS) list of persons determined to be engaged in investment activities in Iran or otherwise in violation of the Iran Contracting Act of 2010 (Public Contract Code Section 2200- 2208).

18. ANTITRUST CLAIMS. The Contractor's attention is directed to the following provision of Public Contract Code Section 7103.5(b) which shall be applicable to the Contractor and its subcontractors:
"In entering into a public works contract or a subcontract to supply goods, services or materials pursuant to a public works contract, the Contractor or subcontractor offers and agrees to assign to the awarding body all right, title and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-35 5/25/2022
materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties."

19. RECORDS. Pursuant to Government Code Section 8546.7, Contractor shall retain all project-related records for a period of five (5) years after final payment on this Contract, which shall be subject to audit or inspection by the City, ACTC or the State Auditor during this period.

Separate and apart from the obligations under Section 8546.7, the City shall have the right to audit project records at City discretion under the following circumstances: (a) submission of a Public Records Act request regarding the project; (b) inability to resolve a disputed contract change order; or (c) submission of a construction claim.

20. TRADE NAMES AND ALTERNATIVES. For convenience in designation in the Contract Documents, certain articles or materials to be incorporated in the work may be designated under a trade name or the name of a manufacturer and its catalog information. Except in those instances where the product is designated to match others in use in a particular improvement, either completed or in the course of completion, the use of an alternative article or material which is of equal quality and of the required characteristics for the purpose intended may be permitted, subject to the following requirements:
a. The Contractor shall submit its Bid for an alternative in writing. Such request shall be made in ample time to permit review and approval without delaying the work. b. No such Bid will be considered unless accompanied by complete information and descriptive data necessary to determine the equality of the offered materials, articles, or equipment.

Samples shall be provided when requested by the Project Manager. The Contractor shall satisfy the Project Manager as to the comparative quality, suitability or performance of the offered materials, articles or equipment. In the event that the Project Manager rejects the use of such alternative materials, articles or equipment, ("material") then one of the particular products designated by brand name will be furnished.
c. The burden of proof as to the quality and suitability of alternatives shall be upon the Contractor and he shall furnish all information necessary as required by the Project Manager. The Project Manager shall be the sole judge as to the quality and suitability of alternative articles, equipment or materials and its decisions shall be final. Where use of an alternative material, article or equipment involves redesign of, or changes to, other parts of the work, the cost and the time required to effect such redesign or changes will be considered in evaluating the suitability of the alter-native material, article or equipment. Cost of redesign by the Project Manager will be borne by the Contractor.
d. Whenever classification, rating or other certification by a body such as UL or NEMA is a part of the specification for any material, proposal for use of alternative materials shall be accompanied by reports from the listed or equivalent recognized and industry accepted independent testing laboratory indicating compliance with specification requirements. The cost of all testing required to prove equality of the material proposed shall be borne by the Contractor. Approval of an alternative material shall be only for the characteristics or use named in such approval and shall not be used to change or modify any Contract requirement.

21. PERMITS AND LICENSES. The Contractor shall procure all permits and licenses (including OSHA permits pursuant to Labor Code Section 6500), pay all charges and fees, and give all notices necessary and incident to the due and lawful prosecution of the work.

The Environmental Quality Act (Public Resources Code, Section 21000 to 21176) may be applicable to permits, licenses and other authorizations which the Contractor must obtain from State or local agencies in connection with performing the work of the Contract. The Contractor shall comply with the provisions of that Act in obtaining such permits, licenses and other authorizations and they shall be obtained in sufficient time to prevent delays to the work.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-36 5/25/2022
The Contractor shall comply with permits obtained by the City, if any, for the work.

SECTION 7-1.03 PUBLIC CONVENIENCE
Add to end of Section 7-1.03 Public Convenience as follows:

Public traffic includes all:

1. motorized vehicles

2. bicycles

3. pedestrian traffic

4. personal mobility devices.

Areas modified by you for use by pedestrians must provide adequate accessibility to meet Americans with Disabilities Act (ADA) requirements. Where walkways are damaged, alternate walkways must be placed around the work site or other materials may be used to allow use of the area. Where plywood is used it must be a minimum of ¾ inch in thickness and beveled at the ends to prevent tripping, fastened down to prevent shifting and supported underneath as needed to prevent bowing. The Engineer may require cold mix to be placed to transition walkway to plywood.

Sidewalks must not be blocked without providing alternative path(s) of travel. Where excavations in pedestrian walkways are minor and do not restrict pedestrian walking area or create a hazard to the pedestrian, structurally sound walkways with safety railings must be provided over or around the excavated area. All walkway areas must comply with the Americans with Disabilities Act.

Where sidewalk and bike path facilities exist, a minimum width of four feet must be maintained at all times a must provide for a safe passage through the work area. At no time will pedestrians be diverted into a portion of the street used concurrently for motorized traffic. At locations where adjacent alternate walkways are not practical, the Engineer may approve sidewalk closures. Appropriate signs and barricades must be installed at the limits of construction and in advance of the closure at the nearest crosswalk or intersection to divert pedestrians across the street.

Provisions must be made to accommodate existing transit routes and stops. You must notify the Engineer at least 72 hours in advance of any work that will require rerouting or delay of a transit line or school bus. You must post any transit stop affected by the rerouting at least 48 hours in advance at the affected transit stop identifying the affected routes, days, and times.

Furnish the Engineer and utility companies with the names, addresses and telephone numbers of two individuals, before starting work that can be reached in case of emergency, 24 hours a day, throughout the duration of the job. These emergency contacts must be able to provide on-site response within one hour.

Do not close streets to traffic without written permission from the Engineer. However, in the absence of the Engineer, if the necessity for closing a street is absolute to prevent immediate danger to the public, you must immediately notify the:

1. Engineer

2. Police Department

3. Fire Department.

Provide access to and from all property adjacent to the work area where normal access existed prior to your work.

All:

1. traffic lanes

2. driveways

3. sidewalks
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-37 5/25/2022

4. street crossings

5. primary business entrances
must be usable at the end of the work day.

Add between the 9th and 10th paragraphs of Section 7-1.03 Public Convenience the following:

If a height differential of more than 0.04 foot is created by construction activities at a joint transverse to the direction of traffic on the traveled way or a shoulder subject to public traffic, construct a temporary taper at the joint with a slope complying with the requirements shown in the following table:

Temporary Tapers
Height
differential
Slope (horizontal:vertical)
Taper use of 14 days or less Taper use of more than 14 days Greater than 0.08 100:1 or flatter 200:1 or flatter

0.04–0.08 70:1 or flatter 70:1 or flatter
For a taper on existing asphalt concrete or concrete pavement, construct the taper with minor HMA under Section 39-2.07.

Grind existing surfaces to accommodate a minimum taper thickness of 0.10 foot under either of the following conditions:

1. HMA material such as rubberized HMA, polymer-modified bonded wearing course, or open-graded friction course is unsuitable for raking to a maximum 0.02 foot thickness at the edge

2. Taper will be in place for more than 14 days.

For a taper on a bridge deck or approach slab, construct the taper with polyester concrete under Section 60-3.04B.

The completed surface of the taper must be uniform and must not vary more than 0.02 foot from the lower edge of a 12-foot straightedge when placed on its surface parallel and perpendicular to traffic.

If authorized, you may use alternative materials or methods to construct the required taper.

SECTION 7-1.03A PUBLIC NOTIFICATION
Add Section 7-1.03A Public Notification as follows:

In consultation with the Engineer, Contractor shall prepare and deliver notices to City regarding various stages of the work, including but not limited to initial start of the work, quarterly updates of work progress, and notification of work activities creating excessive noise, vibration and other disturbing qualities, for notification to properties adjacent to the work area. The notice must include:

1. a brief description of the work

2. date the work will start

3. date the work will end

4. potential impacts on the adjacent property

5. company representative’s name

6. company representative’s phone number where they can be reached or a message can be left.

Company representative must respond to all phone calls received within 24 hours of receipt with the requested information. Contractor shall provide notices to Engineer at least 72 hours in advance of the work. The Engineer must review and approve notice wording. Upon approval of notices by Engineer, Contractor shall distribute said notices to properties adjacent to the work area.

Attention is directed to Government Code Sections 4216 to 4216.9, and in particular Section 4216.2 which provides, in part:

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-38 5/25/2022
"Except in an emergency, every person planning to conduct any excavation shall contact the appropriate regional notification center at least two working days, but no more than 14 calendar days, prior to commencing that excavation, if the excavation will be conducted in an area which is known, or reasonably should be known, to contain subsurface installations other than the underground facilities owned or operated by the excavator, and, if practical, the excavator shall delineate with white paint or other suitable markings the area to be excavated . . . .The regional notification center shall provide an inquiry identification number to the person who contacts the center and shall notify any member, if known, who has a subsurface installation in the area of the proposed excavation."
Contractor shall contact the regional notification center, “Underground Service Alert," and schedule the work to allow ample time for the center to notify its members and, if necessary, for any member to field locate and mark its facilities.
7-1.03A(1) Street Maintenance
Add Section 7-1.03A(1) as follows:

Street maintenance activities, including:

1. overlays

2. reconstruction

3. slurry seal

4. micro-surfacing

5. other surfacing or seal coats
require you notify all residents and businesses within 300 feet or one block (whichever is a greater distance) of the work areas between three and five days in advance of the work. This notification must be in the form of a door hanger which is to be hand-delivered or placed on the front door of each business or residence. A sample door hanger will be shared at the pre-construction meeting.

SECTION 7-1.03A(1) STREET CLOSURE
Add Section 7-1.03A(1) Street Closure as follows:

Where street closures are allowed either under the conditions of the special provisions or by separate authority of the Engineer, comply with the following conditions.

By noon Monday, submit a written schedule of planned closures for the following week period, defined as Friday noon through the following Friday noon.

The street closure schedule must show the:

1. locations

2. dates

3. times
of the proposed street closures. Street closure schedules submitted to the Engineer with any:

1. incomplete

2. unintelligible

3. inaccurate information
will be returned for correction and resubmittal. The Engineer will review and approve or return for corrections the street closure schedule. You may be required to coordinate with other parties as a condition of approval of the street closure schedule.

Provide notification of the street closure to:

1. police dispatch
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-39 5/25/2022

2. bus services

3. garbage company

4. affected properties as described above.

Immediately notify the Engineer if a scheduled street closure will not take place. Amendments to the street closure schedule, including adding additional closures, must be submitted to the Engineer for review and approval, and must be done in writing at least three working days in advance of a planned street closure.

Approval of amendments to the street closure schedule will be at the discretion of the Engineer. Approved closures that are cancelled due to unsuitable weather may be rescheduled at the discretion of the Engineer for the following working day.

Public traffic may only be restricted during those times when work is actually underway.

SECTION 7-1.03A(2) NO PARKING
Add Section 7-1.03A(2) No Parking as follows:

Place "No Parking" signs at least 24 hours before beginning of work. In areas where vehicles may be in the way of construction, place and request the Police Department to verify “No Parking” signs at least 30 hours prior to the beginning of work to allow for the legal time required for notification prior to removing a vehicle.

Do not place “No Parking“ signs more than five days in advance of the anticipated work without prior approval from the Engineer.

If no work is performed for five consecutive days, remove the “No Parking” signs and repost as stated above prior to the start of work.
“No Parking” signs must specify the following:

No Parking
Construction Zone
Tow Away
Per Municipal Code EMC 4-9.17(f)
Date: XXXXX to XXXXXX
Time: XXXXX to XXXXXX
Contractor:

Contractor Office Number:

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-40 5/25/2022
SECTION 7-1.03B TRAFFIC CONTROL PLAN
Add Section 7-1.03B Traffic Control Plan as follows:

Submit to the Engineer a traffic control plan for review and approval by the Engineer prior to any construction activities starting. Submit separate traffic control plans for each phase of the work requiring a change in traffic control. Allow a minimum of five working days for review of the submitted traffic control plan and five working days for review of any resubmitted plans. Do not begin work until the traffic control plan is approved by the Engineer.

Limited work hours may be imposed at any time. If the work impacts traffic flow on any:

1. major route, or

2. in the vicinity of schools, or

3. in the Pedestrian Priority Zone per figure 3-1 of the City’s General Plan, expect that work hour restrictions will be imposed by the Engineer.

Do not restrict the public right-of-way roadway without an approved traffic control plan. The Engineer must review the implemented traffic control for compliance with the approved traffic control plan, prior to the start of any work.

Provide adequate width to allow a bike lane adjacent to the travel lane or provide clear posting that the bicycle lane is closed.

Do not place traffic control devices or construction equipment in bike lanes or in sidewalk such that they are blocked, as determined by the Engineer, when these facilities are open for use.

SECTION 7-1.04 PUBLIC SAFETY
Replace 15th paragraph of Section 7-1.04 Public Safety with:

Notify the Engineer not less than five days and not more than 40 days before the anticipated start of an activity that will change the vertical or horizontal clearance available to traffic, including shoulders.

SECTION 7-1.06 INSURANCE
SECTION 7-1.06B CASUALTY INSURANCE
SECTION 7-1.06G DEDUCTIBLES
SECTION 7-1.06I SELF INSURANCE PROGRAM
Delete Sections 7-1.06B Casualty Insurance, 7-1.06G Deductibles and 7-1.06I Self Insurance Program.

SECTION 7-1.11 FEDERAL LAWS FOR FEDERAL-AID CONTRACTS
SECTION 7-1.11A General
Add between the 1st and 2nd paragraphs of Section 7-1.11A General as follows:

Comply with 46 CFR 381.7(a)–(b).
7-1.12 Indemnification and Insurance
The Contractor's obligations regarding indemnification of the City and the requirements for insurance shall conform to the provisions set forth in the Contract.
7-1.13 Acceptance of Contract
When the Engineer has made the final inspection as provided in Section 5 1.46, "Final Inspection and Contract Acceptance," and determines that the Contract work has been completed in all respects in accordance with the DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-41 5/25/2022
Contract Documents, the Engineer will recommend that the City Council formally accept the Work as complete.

Upon acceptance of the Contract as complete by the City Council, the said Council shall cause a Notice of Completion to be filed and recorded in the records of the Alameda County Recorder's Office. 7-1.14 Sanitary Provisions
Contractor shall conform to the rules and regulations pertaining to sanitary provisions established by the City. Toilets for use of employees on the work shall be furnished where needed and shall be maintained by Contractor. Their use shall be strictly enforced.
7-1.15 Third Party Claims
A. Pursuant to Public Contract Code Section 9201, City shall have full authority to compromise or otherwise settle any claim relating to the Contractor at any time.

B. City shall provide for timely notification to the Contractor of the receipt of any third–party claim relating to the contract. Notice shall be in writing and will be provided within (30) days.

C. City shall be entitled to recover its reasonable costs incurred in providing the notification required by subdivision (b).

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-42 5/25/2022
8 PROSECUTION AND PROGRESS
The Bidder's attention is directed to the provisions in Division I, Section 8, Prosecution And Progress, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 8, Prosecution And Progress, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 8-1.02 SCHEDULE
SECTION 8-1.02A GENERAL
Replace Section 8-1.02A General with the following:

Submit the type of schedule specified in the special provisions. If no type is specified, submit a Level 1.

Submittal of a Schedule is not acceptance. The Engineer will accept the schedule upon review and determination of its compliance with Contract terms and City needs. The schedule will not relieve you of the responsibility for accomplishing the all the work in compliance with the contract.

You agree by submission of a bid, that the work can be completed within contract duration and working hour restrictions.

The Engineer will not accept a schedule which shows a project completion date in excess of the contract time duration. No progress payments will be paid until the Engineer has approved the project schedule.

Float time shown on the approved project schedule is not for exclusive use or benefit of either you or the Engineer. Float time is available for use by either you or the Engineer whoever needs it first in order to:

1. minimize the impact of project problems

2. delays

3. changes in the work.

You agree that float time may be used by the Engineer to resolve project problems. You agree that there will be no basis for any modification of the

1. project milestone dates

2. an extension of the contract time

3. a claim for additional compensation
as a result of any:

1. project problem

2. change orders

3. delay
that only results in the loss of available float on the project schedule.

On a monthly basis prior to application for payment, you must arrange a meeting with the Engineer to review your updated project schedule. Updates must include accurate progress data and be based upon your best judgment. Updates must be made to the project schedule in consultation with all subcontractors and suppliers.

SECTION 8-1.03 PRECONSTRUCTION CONFERENCE
Replace Section 8-1.03 Preconstruction Conference with the following:

The City will execute the Contract with the successful Bidder upon receipt of:

1. bonds
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-43 5/25/2022

2. insurance

3. signed Contract.

The Engineer will set a date for the pre-construction conference. The pre-construction conference will take place within 15 working days of the execution of the Contract by the City. Attendance by your representative is required.

SECTION 8-1.04 START OF JOB SITE ACTIVITIES
SECTION 8-1.04B STANDARD START
Replace Section 8-1.04B Standard Start with the following:

The Contract time, as stated in the special provisions, will begin on the date specified in the notice to proceed, generally the second Monday following the pre-construction conference. Work must commence within ten working days from the start of contract time. Failure to start work within the allotted time period, without written approval of the Engineer, is considered abandonment of the work and the Engineer may terminate your control over the work in compliance with Section 8-1.13.

Work must be diligently prosecuted to completion before the expiration of the Contract time provided in the special provisions, beginning on, and including, the start date given in the notice to proceed.

Do not start job site activities until the City authorizes or accepts your submittal for:

1. CPM baseline schedule

2. WPCP or SWPPP, whichever applies

3. Notification of DRA nominee and disclosure statement

4. Contingency plan for opening closures to traffic

5. Other submittals as called out in these Specifications.

You may enter the job site only to measure controlling field dimensions, take photos or videos, and locate utilities.

Do not start other job site activities until all the submittals from the above list are authorized or accepted and the following information is received by the Engineer:

1. Notice of Materials To Be Used form.

2. Written statement from the vendor that the order for structural steel has been received and accepted by the vendor. The statement must show the dates that the materials will be shipped.

You may start job site activities before the 20th day after Contract approval if you:

1. Obtain specified authorization or acceptance for each submittal before the Specified Date in the Notice to Proceed

2. Receive authorization to start.

Submit a notice 72 hours before starting job site activities. If the project has more than 1 location of work, submit a separate notice for each location.

SECTION 8-1.05 TIME
Replace Section 8-1.05 Time with the following:

You must complete all of the work called for under the Contract within the time set forth in the special provisions.

You must complete any designated portion of the project within the time as shown or specified.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-44 5/25/2022
Determination that a day is a non-working day by reason of inclement weather or conditions resulting therefrom will be made by the Engineer.

The Engineer will provide the status of working days on the monthly progress payment, including:

1. total days

2. days used

3. days remaining.

You are responsible to verify the days are correctly shown on the pay estimate. If you believe an error has been made, notify the Engineer in writing within 15 days of receipt of the pay estimate, or the status of days is deemed accepted as correct.

Complete all work including punch list items before the expiration of the Contract time.

Monthly status of working days will only be provided when working days are being charged and monthly payment is due to you.

SECTION 8-1.06 SUSPENSIONS
Replace Section 8-1.06 Suspensions with the following:

The Engineer may suspend work wholly or in part due to conditions unsuitable for work progress. Provide for public safety and a smooth and unobstructed passageway through the work zone during the suspension in compliance with Sections 7-1.03 and 7-1.04.

The Engineer may suspend work wholly or in part due to your failure to:

1. fulfill the Engineer's orders

2. fulfill a Contract part

3. perform weather-dependent work when conditions are favorable so that weather-related unsuitable conditions are avoided or do not occur.

The Engineer may provide for a smooth and unobstructed passageway through the work during the suspension and deduct the cost from payments. No time adjustment will be made for the suspension.

Upon the Engineer's order of suspension, suspend work immediately. Resume work when ordered.

SECTION 8-1.07 DELAYS
SECTION 8-1.07C PAYMENT ADJUSTMENTS
Replace 1st paragraph in Section 8-1.07C Payment Adjustments with the following:

For an excusable delay that affects your costs, the City may make a payment adjustment.

The City does not make a payment adjustment for overhead incurred during non–working days that extend the Contract into an additional construction season.

SECTION 8-1.10 LIQUIDATED DAMAGES
Replace the 3rd and 4th paragraph of Section 8-1.10A Liquidated Damages with the following:

Liquidated Damages in the Amount of $1,500 per calendar day will be assessed for failure to complete the contract work within the number of workdays specified.

SECTION 8-1.10B FAILURE TO COMPLETE WORK PARTS WITHIN SPECIFIED TIMES SECTION 8-1.10B(1) FAILURE TO COORDINATE SIGNAL TURN-ONS, STRIPING AND SIGNING DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-45 5/25/2022
Add 8-1.10B(1) Failure To Coordinate Signal Turn-Ons, Striping And Signing as follows:

If signal turn-on, road striping, and signing are not coordinated as required by the project specifications, damage will be sustained by the City and its residents. Since it is and will be impractical to determine the actual damage which the City and its residents will sustain by reason of your failure to comply with the project specifications, it is agreed that you will pay to the City the sum of $500 per day for each:

1. day that you fail to stripe the road

2. day that you fail to install required signs after the third day after a signal is turned on

3. day that you fail to turn on a signal after the second day after striping the road

4. day that you fail to remove signs which conflict with new striping

5. day that you fail to install signs as shown or specified.

SECTION 8-1.14 F TERMINATION OF CONTROL
Add Section 8-1.14F as follows:

Whenever, in the opinion of the City , the Contractor has failed to supply an adequate force of labor, equipment, or materials of proper quality, or has failed in any other respect to prosecute the work with the diligence specified in the Contract; or if Contractor should refuse or fail to comply with laws, ordinances, or directions of the Engineer; or if Contractor should fail to make prompt payments to subcontractors or for labor or materials; or otherwise be in breach of this Contract; the City may give written notice of at least five (5) calendar days to the Contractor and Contractor's sureties that if the defaults are not remedied within a time specified in such notice, the Contractor's control over the work will be terminated.

If the Contractor should be adjudged as bankrupt or make an assignment for the benefit of Contractor's creditors, or if a receiver should be appointed on account of Contractor’s insolvency, the City may declare the Contractor's control over the work terminated, and so notify the Contractor and Contractor’s sureties.

Upon such termination, the City may take possession, and use all or any part, of the Contractor's materials, tools, equipment, and appliances upon the premises to complete the work; the City assuming responsibility for the final relinquishment of such equipment at the conclusion of the work, or sooner, at its option, in as good condition as when it was taken over, reasonable wear and tear excepted; and the City agrees to pay for such materials and the use of said equipment at a reasonable compensation.

If the Contractor's control over the work is terminated as provided above, the Contractor is not entitled to receive any portion of the amount to be paid under the Contract until it is fully completed. After completion, if the unpaid balance exceeds the sum of the amount expended by the City in finishing the work, plus all damages sustained, or to be sustained, by the City, plus any unpaid claims on account of labor, materials, tools, equipment, or supplies contracted for by the Contractor for the work herein contemplated, the excess not otherwise required by these Contract Documents to be retained shall be paid the Contractor.

The City reserves the right to terminate the work for its convenience upon written notice to Contractor. In such event, the Contractor shall be paid its reasonable costs for that portion of the work performed to the date of termination, reasonable costs associated with demobilization, plus fifteen percent (15%) of all such costs for overhead and profit.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-46 5/25/2022
9 PAYMENT
The Bidder's attention is directed to the provisions in Division I, Section 9, Payment, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 9, Payment, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 9-1.02A GENERAL
Add to Section 9-1.02A General as follows:

Final pay item quantities are designated with an “(F)” in the bid item list.

SECTION 9-1.03 PAYMENT SCOPE
Add to Section 9-1.03 Payment Scope as follows:

When the Engineer does not retain a portion of the funds during the prosecution of the work, as required on federally funded projects, you may not retain a portion of the funds due to subcontractors when making progress payments.

The City does not pay interest on progress payment retentions.

Your bid prices include all items of work and materials as shown and called out in the project special provisions necessary to complete all the work. The contract prices for doing the work include full compensation for furnishing all:

1. labor

2. materials

3. tools

4. equipment

5. incidentals
to complete the work.

Any items of work that does not have a separate pay item is considered included in other items cost of work and no additional compensation will be paid.
9-1.04 FORCE ACCOUNT
9-1.04A GENERAL
Add to Section 9-1.04A General as follows:

When force account or extra work is in dispute, you must still review your daily work report for the disputed work with the Engineer every day. The daily work must be signed by the Engineer daily to verify that your report has been reviewed. Final determination as to whether the work is included in the contract work or is extra work, may be decided after the work is completed.

SECTION 9-1.04B LABOR
Add to Section 9-1.04B Labor as follows:

For the purposes of calculating the cost of extra work or force account payment:

1. owner

2. superintendents
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-47 5/25/2022

3. other salaried employees
performing work on the project must be billed at the prevailing wage corresponding to the type of work performed as shown in the current labor rate publication.

SECTION 9-1.04D EQUIPMENT RENTAL
SECTION 9-1.04D(1) GENERAL
Add to Section 9-1.04D(1) General as follows:

You must submit a list of equipment anticipated to be used on the project and the associated Caltrans equipment rental rate. If there is no established rate for equipment planned to be used, furnish that information to the Engineer. Provide equipment submittal with Caltrans rates at the pre-construction conference. The most current Caltrans equipment rental rate publication at the date of contract award will be used for the entire project.

SECTION 9-1.07 PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS Delete Section 9-1.07
SECTION 9-1.16 PROGRESS PAYMENTS
SECTION 9-1.16A GENERAL
Replace Section 9-1.16 with:

The City, once in each month, shall cause an estimate in writing to be made by the Engineer. The estimate shall include the total amount of work done and acceptable materials furnished, provided the acceptable materials are listed as eligible for partial payment as materials in the special provisions and are furnished and delivered by the Contractor (provided that the Contractor furnishes evidence satisfactory to the Engineer that the materials are stored in an area subject to or under the control of the City, to the time of the estimate, and the value thereof). The estimate shall also include any amounts payable for mobilization. Daily extra work reports furnished by the Contractor less than 5 calendar days, not including Saturdays, Sundays and legal holidays, prior to the preparation of the monthly progress estimate shall not be eligible for payment until the following month's estimate.

The amount of any material to be considered in making an estimate will in no case exceed the amount thereof which has been reported by the Contractor to the Engineer on City approved forms, properly filled out and executed, including accompanying documentation as therein required, less the amount of the material incorporated in the work to the time of the estimate. Only materials to be incorporated in the work will be considered. The estimated value of the material established by the Engineer will in no case exceed the Contract price for the item of work for which the material is furnished.

Contractor shall submit to Engineer an itemized application for payment for the cost of the work in permanent place, which has been completed in strict accordance with the Contract Documents as of the last day of the preceding month, less amounts previously paid. The application for payment shall be prepared in a form acceptable to the Engineer and shall contain itemized amounts in accordance with the Contract Documents. The applications for payment shall not include requests for payment on account of changes which have not been authorized by Change Orders, or for amounts Contractor does not intend to pay a subcontractor because of a dispute or other reason.

If requested by the City, an application for payment shall be accompanied by a summary showing payment that will be made to subcontractors covered by such application, and unconditional waivers and releases of claims and stop notices, from each subcontractor listed in the preceding application for payment covering sums disbursed pursuant to that preceding application for payment.

Contractor warrants that upon submittal of an application for payment, all work has been performed in strict compliance with the Contract Documents, and all work for which certificates of payment have been previously DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-48 5/25/2022
issued and payment has been received from City, shall be free and clear of all claims, stop notices, security interests, and encumbrances in favor of Contractor, subcontractors or other persons or firms entitled to make claims by reason of having provided labor, materials, or equipment related to the work.

Payment of all, or any part, of an application for payment may be withheld, a certificate of payment may be withheld, all or part of a previous certificate for payment may be nullified and that amount withheld from a current certificate for payment, or the City may withhold from payment, on account of any of the following:

1. Defective work not remedied;

2. Third-party claims against Contractor or City arising from the acts or omissions of Contractor or subcontractors;

3. Stop Notices;

4. Failure of Contractor to make timely payments due to subcontractors for material or labor;

5. Damage to the City or others for which Contractor is responsible;

6. Failure of Contractor to maintain, update, and submit record documents;

7. Failure of Contractor to submit schedules or their updates as required by the Contract Documents;

8. Performance of the work by Contractor without properly processed shop drawings; 9 Liquidated damages assessed;

10. Any other failure of Contractor to perform its obligations under the Contract Documents.

The request for a progress payment shall be turned into the City by the 20th of each month and the City shall process payment to be ready by the 20th of the following month. Pursuant to Public Contract Code Section 20104.50, if City fails to make a progress payment in a timely manner, it shall pay interest to Contractor at the legal rate set forth in the Code of Civil Procedure Section 685.010(e). Upon payment of a progress invoice, the City is hereby granted title and ownership to all work in progress, drawings, materials, equipment, machinery, fittings, items of outfit and furnished goods invoiced for as required by this Agreement, which shall be free of encumbrances.

Add to Section 9-1.16A General as follows:

Items Contractor wants Engineer to be eligible for progress payment even if they are not incorporated into the work shall be determined with a written change order.

Progress payments will provide you compensation for work and eligible materials through the last day of the month. No progress payment will be made when the work is not proceeding in compliance with the contract or when the total value of the work done since the last progress payment is less than $1000, as determined by the Engineer.

SECTION 9-1.16C MATERIALS ON HAND
Replace Section 9-1.16C Materials on Hand with the following:

Materials on hand but not incorporated into the work are eligible for progress payment of fifty percent (50%) of the value of the materials furnished and delivered and unused. For materials to be eligible for progress payment:

1. the cost of the materials must be greater than $20,000

2. an invoice is provided for the material clearly showing the material is for this current work and cost

3. the material is stored in a secure yard and made available to the Engineer for inspection

4. a request for partial payment is made
SECTION 9-1.16E WITHHOLDS
Replace 1st paragraph in Section 9-1.16E(2) with:

The City withholds 10 percent of a progress payment for noncompliant progress. Noncompliant progress occurs when:

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-49 5/25/2022

1. Total days to date exceed 75 percent of the working days

2. Percent of working days elapsed exceeds the percent of value of work completed by more than 15 percent
Add to Section 9-1.16E(2).

The City may withhold a portion of your payment for fines and mitigation imposed by outside regulatory authorities, as a result of your failure to comply with regulations and permits.

Upon Contractor's request, City will make payment of funds withheld from progress payments pursuant to the requirements of Public Contract Code Section 22300, if Contractor deposits in escrow with City or with a bank acceptable to City, securities eligible for investment under Government Code Section 16430, bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by Contractor and City, upon the following conditions:
a. Contractor shall bear the expense of City and the escrow agent in connection with the escrow deposit made.
b. Securities or certificates of deposit to be placed in escrow shall be of a value at least equivalent to the amounts of retention to be paid to Contractor pursuant to this section. c. Contractor shall enter into an escrow Contract satisfactory to City, which Contract shall be substantially similar to the form provided in Public Contract Code Section 22300. d. Contractor shall obtain the written consent of the surety to such Contract.

SECTION 9-1.16E(4) STOP NOTICE WITHHOLDS
Replace Section 9-1.16E(4) Stop Notice Withholds with the following:

The City shall withhold payments to cover claims filed under Civil Code §9000 et seq. The City will withhold 125 percent of the value of all Stop Notices in accordance with Civil Code §9364.

Stop notice information may be obtained from the Engineer.

SECTION 9-1.16F RETENTIONS
Replace Section 9-1.16F Retentions with the following:

Public Contract Code 7202 does not apply to the City.

City shall retain five percent (5%) of the estimated value of the work completed and five percent (5%) of the value of materials estimated to have been furnished and delivered and unused or furnished and stored as part security for the fulfillment of the Contract by Contractor. Securities may be substituted as set forth in Public Contracts Code Section 22300. No such invoice or payment will be construed to be an acceptance of any work or materials. Before any progress payment or the final payment is made, Contractor may be required to submit satisfactory evidence that he is not delinquent in payments to his employees, subcontractors, suppliers or other creditors for labor and materials incorporated into the work.

SECTION 9-1.17 PAYMENT AFTER CONTRACT ACCEPTANCE
SECTION 9-1.17C PROPOSED FINAL ESTIMATE
Delete 3rd paragraph in Section 9-1.17C Proposed Final Estimate.

SECTION 9-1.17D FINAL PAYMENT AND CLAIMS
SECTION 9-1.17D(1) GENERAL
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-50 5/25/2022
Replace Section 9-1.17D(1) General with the following:

If Contractor accepts the proposed final estimate or does not submit a claim statement within 30 days of receiving the proposed final estimate, the Engineer will process the proposed final estimate for payment. The final payment will not be due and payable until the expiration of 40 days from the date the notice of completion is filed with the City of Emeryville. The Notice of Completion will be filed within five days of formal acceptance of the work by the City Council or its designated representative, upon the recommendations of the Engineer.

This final estimate and payment is conclusive except as specified in Sections 5-1.27, 6-3.06, and 9-1.21.

If Contractor submits a claim statement within 30 days of receiving the Engineer’s proposed final estimate, the Engineer will process for payment the proposed final pay estimate for payment of the uncontested amount due.

The Engineer will pay the uncontested amount due within 40 days from the date the notice of completion is filed with the City of Emeryville. The uncontested amount due estimate is conclusive as to the amount of work completed and the amount payable except as affected by the claims or as specified in Sections 5-1.27, 6-3.06, and 9-1.21.

SECTION 9-1.17D(2) CLAIM STATEMENT
SECTION 9-1.17D(2)(A) GENERAL
Add to Section 9-1.17D(2)(a) General as follows:

For each claim, submit a claim statement showing:

1. The identification number

2. Date the Initial Potential Claim was furnished to the Engineer

3. Date the Supplemental Potential Claim was furnished to the Engineer

4. The final amount of additional payment requested

5. Attach a copy of the Full and Final Potential Claim Record Submit claims to:

City Engineer
City of Emeryville – Public Works Department
1333 Park Avenue
Emeryville, CA 94608
SECTION 9-1.17D(2)(D) WAIVER
Add to 1st paragraph in Section 9-1.17D(2)(d) Waiver as follows:

1. You did not comply with applicable notice or protest requirements including but not limited to:

Section 4-1.06;
Section 5-1.06;
Section 5-1.42; or
Section 8-1.07.

SECTION 9-1.17D(3) FINAL DETERMINATION OF CLAIMS
Delete 6th paragraph in Section 9-1.17D(3) Final Determination of Claims.

SECTION 9-1.22 ARBITRATION
Replace Section 9-1.22 Arbitration with the following:

Section 9-1.22 Claim Resolution Procedure

1. For all claims contested by the Engineer and not included in the semifinal estimate, the Engineer may request additional information within 30 days of submittal of the semifinal estimate. A proof of mailing or delivery must be retained.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW-21102 B-51 5/25/2022

2. You must submit to the Engineer the information requested for each claim within 30 days of the date of mailing of the Engineer’s request. Proof of mailing or Engineer’s receipt will be retained for the submittal. Failure to timely submit the information requested is deemed a waiver of the claim.

3. The Engineer will submit a written response to you for each claim within 30 days after the date of mailing of your submittal, or if the Engineer did not request additional information, within 30 days of submittal of the semifinal estimate.

4. If you dispute the Engineer’s written response to any claim, or the Engineer fails to respond within the time specified, you must notify the Engineer in writing, either within 15 days of the Engineer’s response or the Engineer’s failure to respond within the specified time period, and demand an informal meeting to discuss and attempt to settle the issues remaining in dispute. Upon receipt of such a demand, the Engineer will schedule such a meeting within 30 days.

5. Following the meeting if any claim or portion thereof remains in dispute, you may file a claim as provided in Government Code 910 and following.

6. Either party may request non-binding mediation at any time following the informal meeting in an attempt to settle any issues remaining in dispute. If both sides agree to mediation and agree on a mediator, the parties must pay equally the fees and expenses of the mediator.

7. If either party initiates litigation against the other, within 60 days, but no earlier than 30 days, following the filing of the responsive pleading, the court may submit the matter to nonbinding mediation unless both parties stipulate to waive this requirement. The parties must select a disinterested third person as mediator within 15 days following the 60th day after the filing of the responsive pleading, and the mediation must commence within 30 days of selection of the mediator, unless the parties stipulate otherwise, or the court, on a showing of good cause, orders a time extension. If the parties fail to select a mediator within the 15-day period, any party may petition the court to appoint the mediator. The parties must pay equally the fees and expenses of the mediator.

The court may, upon either party’s request, order any witnesses to participate in the mediation process. The party requesting the appearance of any witness must pay the costs and expenses of the witness.

SECTION 9-1.23 CITY BILLING
Add Section 9-1.23 City Billing as follows:

Where City staff and equipment are used for work, billing will be done at the hourly billing rate for particularly involved City staff. City materials and equipment will be billed in compliance with Section 9-1.04. Work performed by a third party will be billed at the amount charged to the City for the work plus an additional five percent markup. The total cost plus markup may be retained from contract or for private work billed to permittee.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 1 5/26/2022
PART C

SPECIAL PROVISIONS
FOR

ANNUAL STREET REHABILITATION AND

PREVENTIVE MAINTENANCE PROJECT
FISCAL YEAR 2021/2022
PROJECT NO. EPW-21102
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 2 5/26/2022
SECTION 1

MISCELLANEOUS
1-1.0 WORK SITE MAINTENANCE
1-1.1 Clean Up and Dust Control
During the progress of work, the Contractor shall keep the entire job site in a clean and orderly condition. Spillage resulting from hauling operations along or across existing streets, roads, paths or lawns shall be removed immediately by the Contractor. All gutters and roadside ditches shall be kept clean and free from obstruction. Any deviation from this practice must have written approval from the City Engineer.

The generation of dust shall be controlled as required by the Bay Area Air Quality Management District. The Contractor shall govern his operations and construction methods at all times so as to prevent any dust problems within the area of work or along adjacent properties and shall provide the water wagons, water, labor, or any material or equipment required to provide adequate control of dust to the complete satisfaction of the Engineer. Dust-generating activities shall cease during periods of high winds (greater than 25 MPH). Trucks hauling soil, dirt, sand or other emissive materials shall have their loads covered with a tarp or other protective cover as determined by the Engineer. Any damage resulting from dust shall be the complete and sole responsibility of the Contractor.

No separate payment will be made for dust control but shall be included in the appropriate item of work.

Before final acceptance of the work, the Contractor shall carefully clean up the work area and premises remove all surplus construction materials and rubbish of all kinds from the grounds which he has occupied and leave them in a neat condition. 1-1.2 Water Pollution Control
The intent of these requirements is to enforce federal, state, and other local agency regulation prohibiting storm water pollution from construction sites. The storm drain system discharges directly to creeks and the San Francisco Bay without treatment. Therefore, pollutant discharge into the storm drain system is strictly prohibited. Here pollutant discharge means any substance, material, or waste, and discharges NOT permitted under the National Pollutant Discharge Elimination System regulated by the State of California Regional Water Quality Control Board or the United States Environmental Protection Agency other than uncontaminated storm water.

The Contractor shall conform to all applicable local, state and Federal regulations and laws pertaining to water pollution control. The Contractor shall conduct and schedule operations and follow and implement Best Management Practices (BMPs) in such a manner as to prevent water pollution.

Full compensation for Water Pollution Control shall be considered as included with all contract items of work and no additional compensation will be allowed therefore.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 3 5/26/2022
1-1.2.1 Best Management Practices.

For the purpose of eliminating storm water pollution, the Contractor shall implement effective control measures known as Best Management Practices (BMPs). BMPs include schedules of activities, prohibition of practices, general good housekeeping practices, operational practices, pollution prevention practices, maintenance procedures, and other management procedures to prevent pollutant discharge directly or directly into the storm drain system. BMPs also include the construction of some facilities that may be required to prevent, control, and abate storm water pollution. The Contractor shall implement and maintain such BMPs as are relevant to the work, and as are specifically required by the Plans or Special Provisions. The Contractor shall be responsible throughout the Contract duration for installing, constructing, inspecting, maintaining, removing and disposing of BMPs for wind erosion control, tracking control, erosion and sediment control, non-storm water control, and waste management and materials pollution control. Unless otherwise directed by the Engineer, the Contractor shall be responsible for BMP implementation and maintenance throughout any temporary suspension of the Work.

Any BMP required to protect storm water quality shall be installed within 24 hours of the time Contractor is notified by the Engineer or regulatory agencies to install such BMP's. 1-1.2.2 Material Storage.

Storage and exposure of raw materials, by-products, finished products, and containers shall be controlled as described below:

All construction materials shall be stored at least ten feet away from inlets, catch basins, and curb returns. The Contractor shall not allow any material to enter the storm drain system. Measures shall be taken to maintain a neat and protected pile. At the end of each working day, the Contractor shall collect and dispose of all scrap, debris, and waste material excluding materials set aside for recycling and salvage.

Materials set aside for recycling and salvage shall be delivered to the recycling station within five days. Materials that can contaminate rainwater or be transported by storm water or other runoff to the storm drain system require special storage. During wet weather or when rain is forecast, the Contractor shall store such materials inside a building or cover them with a tarp or other waterproof material secured with weighted tires or sandbags to prevent contact with rain.

The Contractor is reminded that storage and disposal of all hazardous materials such as paints, thinners, solvents, and fuels; and all hazardous wastes such as waste oil, must meet all federal, state and local standards and requirements. 1-1.2.3 Pavement Saw Cutting Operations.

The Contractor shall prevent any saw cutting debris from entering the storm drain system.

The Contractor shall preferably use dry cutting techniques and sweep up residue. If wet methods are used, the Contractor shall vacuum slurry as cutting proceeds or collect all wastewater by constructing a sandbag sediment barrier. The bermed area shall be of adequate size to collect all wastewater and solids. The Contractor shall allow collected water to evaporate, as approved by the Engineer, if the wastewater volume is minimal and if maintaining the ponding area does not interfere with public use of the street area, DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 4 5/26/2022
create a safety hazard, or does not create standing water that remains longer than 72 hours. If the Engineer approves, the Contractor may direct or pump saw cutting wastewater to a dirt area for infiltration. This dirt area shall be adequate to contain all the wastewater. After wastewater has infiltrated, all remaining saw cutting residue must be removed and disposed of properly.

With the approval of East Bay Municipal Utility District (EBMUD) and the Engineer, desilted water may be pumped to the sanitary sewer to assist in the evaporation or infiltration process. Remaining silt and debris from the ponding or bermed area shall be removed or vacuumed and disposed of properly. If a suitable dirt area is not available or discharge to the sanitary sewer is not feasible, with the Engineer’s approval the Contractor shall filter the saw-cutting wastewater through filtering materials and methods meeting ABAG Standards For Erosion and Sedimentation Control Measures (latest edition) before discharging this wastewater to the storm drain.

1-1.2.4 Pavement Operations.

The Contractor shall prevent the discharge of pollutants from paving operations by using measures to prevent run-on and runoff pollution, properly disposing of wastes, and by implementing the following Best Management Practices:
a. No placement of concrete or paving during wet weather. b. Store materials as required by 1-1.2.2.
c. Cover inlets and manholes when applying asphalt, seal coat, tack coat, slurry seal, fog seal, etc.
d. Place drip pans or absorbent materials under paving equipment when not in use.

During wet weather store contaminated paving equipment indoors or cover with tarp or other waterproof covering.
e. Sweep work site daily to prevent sand, gravel or excess asphalt from entering, or being transported by rain, into the storm drain system. The contactor shall use water and sweeper trucks on a daily basis including weekends to maintain the site. f. Keep ample supplies of drip pans or absorbent materials on-site. 1-1.3 Storage in Public Streets and Right-of-Way
Construction equipment and materials shall not be stored in public streets and right-of-way.

Excavated material, except that which is to be used as backfill in the adjacent trench, shall not be stored in public streets and right-of-way unless otherwise specified in these Special provisions or approved by the Engineer. Immediately after placing backfill, all excess material shall be moved from the Work site.
1-1.4 Storage of Equipment and Material on Private Property If the Contractor wishes to use private property as a Construction Yard, then prior to any staging, storing, or parking of any Contract equipment and/or materials on said private property, the Contractor shall comply with the following requirements:
a. The Contractor must provide the Engineer a site map for review indicating the proposed location of the Construction Yard;
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 5 5/26/2022
b. The location of the Construction Yard must be approved by the Engineer and written approval must be provided to the Contractor by the Engineer; c. The Contractor shall submit to the Engineer a copy of the written agreement with the legal owner of the affected property to be used as a Construction Yard; d. Within the Construction Yard itself, the Contractor must comply with the Best Management Practices for storm water protection as required by the Contract documents. e. The Contractor shall also not deliver or remove any equipment or material outside the Contract construction hours specified.
1-2.0 COOPERATION
Attention is directed to Section 8-1.10 "Utility and Non-Highway Facilities," of the Standard Specifications and these Special Provisions.

Payment for coordination and cooperation shall be considered as fully compensated in the various related items of work and therefore no separate payment will be allowed for said coordination and cooperation between Contractors, utility companies or property owners. 1-3.0 OBSTRUCTIONS
Attention is directed to Section 8.1-10, “Utility and Non-Highway Facilities,” and Section 15, “Existing Highway Facilities,” of the Standard Specifications as well as Section 5.0 of the "Green Book" and these Special Provisions.

The Contractor’s attention is directed to the existence of certain underground facilities that may require special precautions be taken by the Contractor to protect the facility and the health, safety and welfare of the workmen and of the public. Facilities requiring special precautions include, but are not limited to:
natural gas in pipelines operating at pressures greater than 60 psi (gage); underground electric supply system conductors or cables, with potential to ground of more than 300 volts, either directly buried or in duct or conduit which do not have concentric grounded conductors or other effectively grounded metal shields or sheaths; water lines, telephone lines, cablevision lines, storm drains, sanitary sewer lines, etc.

If such facilities are not located on the plans in both alignment and elevation, no work shall be performed in the vicinity of said facilities until the Contractor has located the facility by USA’ing, potholing, probing, or other means that will locate and identify the facility to the satisfaction of the Engineer.

The Contractor shall notify the Engineer and the appropriate regional notification center for operators of subsurface installations at least two working days, but not more than 14 calendar days, prior to performing any excavation or other underground works. Regional notification centers include but are not limited to the following:

Notification Center Telephone
Underground Service Alert, 1 (800) 642-2444
Northern California (USA)

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 6 5/26/2022
1-4.0 CONSTRUCTION AREA SIGNS
Construction area signs shall be furnished, installed, maintained, and removed when no longer required in accordance with the provisions in Section 12, “Construction Area Traffic Control Devices,” of the Standard Specifications and as shown on the plans, and these Special Provisions.

In addition to the standard construction area signage, a minimum of two (2) Project Signs will be provided to the Contractor for installation as directed by the Engineer. Additionally, the Contractor shall attach magnetic signage, as furnished by the Engineer, to all equipment working on the project. Said signage shall be removed and returned to the Engineer upon completion of the work.

All excavations required to install construction area signs shall be performed by hand methods without the use of power equipment, except that power equipment may be used if it is determined, to the satisfaction of the engineer that there are no utility facilities in the area of the proposed posthole excavations.

Full compensation for furnishing, placing, maintaining, and removal of construction area signs shall be included in all other items of work and no separate payment will be allowed therefore. 1-5.0 MAINTAINING TRAFFIC
Attention is directed to Sections 7-1.08 "Public Convenience", 7-1.09 "Public Safety", and 12 "Construction Area Traffic Control Devices", of the Standard Specifications, and to the Section entitled "Public Safety" elsewhere in these special provisions, and to these special provisions. Nothing in these special provisions shall be construed as relieving the Contractor from his responsibility as provided in said Section 7-1.09. Lane closures shall conform to the provisions in Section 12 “Construction Area Traffic Control Devices” of the Standard Specifications.

Access to all properties shall be maintained at all times and not impact their daily operations. If necessary, the Contractor shall construct in phases or in a manner to ensure no disruption to accessibility, including installing steel plating if necessary.

The contractor shall keep and maintain ADA compliance through all working areas. The Contractor shall provide and maintain a minimum (1) 5-foot-wide path for pedestrian traffic through the construction site.

If a path through the construction site and within street right of way is not possible, the Contractor shall lay out and maintain a safe and direct pedestrian path around the construction site within the public right of way. Pedestrian paths shall be provided with surfacing of asphalt concrete, Portland cement concrete or timber. Surface shall be skid resistant and free of irregularities. At newly established temporary crosswalks, temporary signage and striping shall be placed in order to alert vehicles and maintain safe passage for pedestrians. The pedestrian path shall be approved by the Engineer.

Many of the streets on this project are on “bicycle boulevards.” Extra care shall be provided to create a safe and reasonable access route or detour for bicyclists. The Contractor shall provide and maintain safe travel for bicycles through all construction areas. Bicyclist shall be notified by signage of changes to the bicycle route, and Contractor shall provide proper signage or temporary traffic markings to guide bicyclists through the construction area. Temporary traffic control signage shall be placed outside of bicycle paths whenever possible (instead place in median, parking space, partially on sidewalk, existing light poles, etc.).

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 7 5/26/2022
During operations that require lane reduction, the Contractor shall provide and maintain one eleven-footwide lane to provide flagger-controlled travel in each direction at all times for the following streets:

1. Adeline Street

2. 48th Street

3. 47th Street

4. 45th Street

5. 43rd Street

6. 41st Street (one way WB)
Generally, a full or partial closure of the street is allowed on the remaining project streets as long as access for local businesses and residences is maintained. Prior to the start of each portion of work the Contractor shall submit a specific traffic control plan for approval by the Engineer. The TCP shall provide detours for vehicles, bicycles, and pedestrians. This plan shall include a public notice submittal for the City’s review and approval. After the TCP is approved, the Contractor must notice all affected properties.

Due to local traffic congestion and circulation issues caused by parallel streets being closed at the same time, the following groups of streets cannot be slurry sealed at the same time:

1. Doyle Street and 47th Street (west of San Pablo)

2. 48th Street and 47th Street (east of Salem)

3. 45th Street and 43rd Street
No reduction of the traveled way width shall be permitted before 7:00 a.m. nor after 6:00 p.m. on any street unless prior approval in writing is obtained from the Director of Public Works. The Contractor shall also not store construction equipment within any public streets and right of way outside the previously specified hours. The Contractor shall also not deliver/remove any equipment or material to/from the Construction Yard or work area outside the previously specified hours.

The Contractor shall cooperate with local authorities relative to handling traffic through the area and shall make their own arrangements relative to keeping the working area clear of parked vehicles. Such arrangements shall be subject to the prior written approval of the Engineer. Special attention shall be given to work occurring on 47th Street due to multiple schools being adjacent to the work areas. Two week notice is required to affected properties for any work on 47th Street west of Salem Street.

Personal vehicles of the Contractor’s employees shall not be parked on the traveled way or shoulders, including any section closed to public traffic.

The Contractor shall provide and maintain traffic control during all construction activities in accordance with the Work Area Traffic Control Manual Handbook (WATCH) or the approved Traffic Control Plan. If the Contractor cannot provide and maintain traffic control as required, then the Engineer may direct the Contractor to provide, maintain, and/or update a full traffic control plan (signed by a registered Professional Engineer/Traffic Engineer), with no additional compensation.

Full compensation for conforming to the requirements in this section "Maintaining Traffic" shall be considered as included in the contract price paid for Traffic Control System and no additional compensation will be allowed therefor.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 8 5/26/2022
1-6.0 PROGRESS SCHEDULE
Progress schedules will be required for this contract and shall conform to the provisions in Section 8-1.04 "Progress Schedule" of the Standard Specifications. Full compensation for Progress Schedule shall be considered as included with all contract items of work and no additional compensation will be allowed therefore.
1-7.0 TIME OF COMPLETION
The Contractor shall complete the work within thirty five (35) working days after the commencement date specified in the Notice to Proceed.

The contractor shall commence operations within 7 calendar days after the effective date of the Notice to Proceed.
1-8.0 HOURS OF WORK
The Hours of Work for this project shall be as follows for non-holiday weekdays: 7:00 a.m. to 6:00 p.m.

Work activities occurring between the hours of 6:00 pm and 7:00 am shall not be permitted.

Slurry treatment on roadways shall not be placed later than 2:00 p.m. for all areas shown on plans to receive Slurry treatment.

The use of spray guns, loud leaf blowers, generators, and other equipment with noise levels similar to those of jack-hammers/pile-drivers shall be done after 8:00 a.m. Contractors shall practice caution and courtesy when working adjacent to homes and businesses. Proper notification and estimated timelines of work shall be given to nearby homeowners and business owners as part of the Section 1-5.0 and 10-

2.3 requirements.
1-9.0 AS-BUILT DRAWINGS
The Contractor shall maintain one (1) clean set of marked plans showing all changes and "record" information and submit a copy to the City upon completion of work. Any changes must be approved by the City inspector before being done. Note any changes on marked print copy.

The Contractor is required to track and record all changes made throughout the completion of the project and shall submit a complete red-lined copy of the construction plans to the Engineer for review of those changes indicated. If necessary, the Contractor shall address any comments and resubmit the red-lined plans. Upon approval by the Engineer, the Contractor shall submit 2 hard copies and 1 electronic PDF copy of the final approved red-lined plans. A Notice of Completion and/or Final Payment will not be released until the approved red-lined plans are received as described. The cost of the work and materials to provide the approved red-lined construction plans shall be included in the cost for Mobilization 1-10.0 PUBLIC SAFETY
The Contractor shall provide for the safety of traffic and the public in accordance with the provisions in Section 7-1.09, "Public Safety," of the Standard Specifications and these special provisions.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 9 5/26/2022
The Contractor shall install temporary railing (Type K) between any lane carrying public traffic and any excavation, obstacle, unprotected pedestrian walkway, or storage area when the following conditions exist:

(1) Excavations.

Any excavation, the near edge of which is 12 feet or less from the edge of the lane, except:
(a) Excavations covered with sheet steel or concrete covers of adequate thickness to prevent accidental entry by traffic or the public.
(b) Excavations less than one foot deep.
(c) Trenches less than one foot wide for irrigation pipe or electrical conduit, or excavations less than one foot in diameter.
(d) Excavations parallel to the lane for the purpose of pavement widening or reconstruction. (e) Excavations in side slopes, where the slope is steeper than 4:1. (f) Excavations protected by existing barrier or railing. (2) Temporarily Unprotected Permanent Obstacles.

Whenever the work includes the installation of a fixed obstacle together with a protective system, such as a sign structure together with protective railing, and the Contractor elects to install the obstacle prior to installing the protective system; or whenever the Contractor, for his convenience and with permission of the Engineer, removes a portion of an existing protective railing at an obstacle and does not replace such railing complete in place during the same day.

(3) Temporarily Unprotected Pedestrian Pathways.

Whenever temporary unprotected pedestrian walkways are located adjacent to the traffic lane through the construction area.
(4) Storage Areas.

Whenever material or equipment is stored within 12 feet of the lane and such storage is not otherwise prohibited by the specifications.

The approach end of temporary railing (Type K), installed in accordance with the requirements in this section "Public Safety" and in Section 7-1.09, "Public Safety," of the Standard Specifications shall be offset a minimum of 15 feet from the edge of the traffic lane open to public traffic. The temporary railing shall be installed on a skew toward the edge of the traffic lane of not more than one foot transversely to 10 feet longitudinally with respect to the edge of the traffic lane. If the 15-foot minimum offset cannot be achieved, the temporary railing shall be installed on the 10 to 1 skew to obtain the maximum available offset between the approach end of the railing and the edge of the traffic lane, and an array of temporary crash cushion modules shall be installed at the approach end of the temporary railing.

Temporary railing (Type K) shall conform to the provisions in Section 12-3.08, "Temporary Railing (Type K)" of the Standard Specifications, except temporary railing (Type K) fabricated prior to January 1, 1993, with one longitudinal No. 5 reinforcing steel bar near the top in lieu of the 2 longitudinal No. 5 reinforcing steel bars near the top, as shown on the plans, may be used.

Temporary crash cushion modules shall conform to the provisions in "Temporary Crash Cushion Module" elsewhere in these special provisions.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 10 5/26/2022
Except for installing, maintaining and removing traffic control devices, whenever work is performed or equipment is operated in the following work areas, the Contractor shall close the adjacent traffic lane unless otherwise provided in the specifications:

Approach Speed of Public Traffic
(Posted Limit in MPH)
Over 45
35 to 45
Work Areas
Within 6 feet of a traffic lane but not on a
traffic lane.

Within 3 feet of a traffic lane but not on a
traffic lane.

The lane closure provisions of this section shall not apply if the work area is protected by permanent or temporary railing or barrier.

When traffic cones or delineators are used to delineate a temporary edge of traffic lane, the line of cones or delineators shall be considered to be the edge of traffic lane, however, the Contractor shall not reduce the width of an existing lane to less than 10 feet without written approval from the Engineer.

When work is not in progress that required closure of an adjacent lane, the traffic cones or portable delineators used for the lane closure shall be placed off of and adjacent to the edge of the traveled way.

The spacing of the cones or delineators shall be not more than the spacing used for the lane closure.

Suspended loads or equipment shall not be moved nor positioned over public traffic or pedestrians.

Full compensation for conforming to the requirements in this section "Public Safety," including furnishing and installing temporary railing (Type K) and temporary crash cushion modules, shall be considered as included in the contract price paid for Traffic Control System and no additional compensation will be allowed therefor.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 11 5/26/2022
SECTION 2
BLANK
SECTION 3
BLANK
SECTION 4
BLANK
SECTION 5
BLANK
SECTION 6
BLANK
SECTION 7
BLANK
SECTION 8
BLANK

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 12 5/26/2022
SECTION 9

DESCRIPTION OF WORK
9-1.0 WORK TO BE PERFORMED
The work to be performed under this contract shall consist of, but not necessarily be limited to, the following:

This project entails street rehabilitation and preventive maintenance on various streets throughout the City of Emeryville. The specific streets included in this project are:
 41st Street (San Pablo Avenue – Adeline Street)
 43rd Street (San Pablo Avenue – Adeline Street)
 45th Street (San Pablo Avenue – Adeline Street)
 47th Street (San Pablo Avenue – Adeline Street)
 48th Street (San Pablo Avenue – City Limits)
 Salem Street (43rd Street – 45th Street)
 Essex Street (43rd Street – 45th Street)
 Doyle Street (45th Street – Steve Dain Drive)
 Steve Dain Drive (Doyle Street – San Pablo Avenue)
This project generally includes, but is not limited to, the reconstruction and preservation of asphalt pavement; replacement of traffic striping and markings; installation of signs; reconstruction of PCC sidewalks, driveways, medians, curb, gutters, and curb ramps; and reconstruction of existing bulbout planters.

In regards to asphalt pavement preservation and maintenance, the project requires the contractor to use crack seal, crack repair, and slurry seal where indicated. In regards to asphalt pavement removal and replacement, the project requires various methods including the contractor to provide a full dig out, replace the existing asphalt, and construction of new pavement section where indicated.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 13 5/26/2022
SECTION 10

CONSTRUCTION DETAILS
10-1.0 ORDER OF WORK
Order of Work shall conform to the provisions in Section 5-1.05, “Order of Work”, of the Standard Specifications and these Special Provisions.

The first order of work after the Notice to Proceed is to provide an accurate project schedule, example public notice, and traffic control plans for approval by the Engineer.

Work shall be staged in a manner to maintain two-way traffic (including allowances and proper signage for bicyclists) and at least one pedestrian path at all times within the given work zone.

Dig Out repair removals shall be limited to the area that can be fully restored within the same shift so that all traffic lanes can be open at the end of each shift.

Payment for staging and coordinating work shall be included with the associated items of work. 10-2.0 ITEMS OF WORK – GENERAL
All items of work are to be installed or constructed as specified in the Standard Specifications, the Standard Plans, as shown on the plans, or as modified in these Special Provisions. Each item is listed with the corresponding sections of the Standard Specifications, which may apply thereto. These listings are not necessarily all of the sections which may apply and are not meant to exclude other sections which are not referred to specifically but do give direction to the work. The Special Provisions shall take precedence over the Plans and the Plans shall take precedence over the Standard Specifications. 10-2.1 BID ITEM 1 – SUPPLEMENTAL WORK
This item is provided to account for new and unforeseen work not specifically provided for on the plans or in the Special Provisions. The dollar amount listed in the Estimate of Quantities is an estimate only and will be included in each bidder's proposal. Supplemental work shall be performed only upon direct written authorization from the City Engineer. Daily work reports will be required if the work is to be paid for on a force account basis. Agreed price may be used as an alternate method of payment, if directed by the City Engineer.

10.2.1.1 Unsuitable Material for Street Improvements
If, in the Contractor’s opinion, unsuitable material is encountered to properly construct any of the improvements indicated on the plans, the Contractor shall immediately notify the Engineer. The Engineer will determine the suitability of the material and/or subgrade. Based on the Engineer’s decision the contractor may be directed to remove and dispose of all unsuitable materials and replace with suitable materials.
10-2.1.2 Payment for Bid Item 1 – Supplemental Work
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 14 5/26/2022
Final payment for “Supplemental Work” will be based on the total amount of supplemental work actually performed and will not be subject to the provisions of Section 4 of the Standard Specifications.
10-2.2 BID ITEM 2 – MOBILIZATION
Mobilization shall conform to the provisions in Section 11, “Mobilization,” of the Standard Specifications 10-2.2.1 Payment for Bid Item 2 - Mobilization
The contract lump sum price paid for “Mobilization” shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in mobilization, including placing, removing, maintaining, moving to new locations, and furnishing Record Drawings as specified in the Standard Specifications and these Special Provisions. 10-2.3 BID ITEM 3 – TRAFFIC CONTROL SYSTEM
A traffic control system shall consist of modifying or closing traffic lanes in accordance with the provisions under Section 1-4.0 "Construction Area Signs” and Section 1-5.0 "Maintaining Traffic” found elsewhere in these Special Provisions, the provisions of Section 12 "Construction Area Traffic Control Devices" of the Standard Specifications, and the Project Plans.

This work shall include but not be limited to the implementation of the plans detailing traffic handling, installation of construction area signs, temporary striping, and installation of project signage. The work of this item shall include removal of said signs upon completion of the work.

Prior to the start of each portion of work the Contractor shall submit a specific traffic control plan for approval by the Engineer. This plan shall include a public notice submittal for the City’s review and approval. Public notification of parking and access restrictions shall be posted not less than 3 working days prior to the start of work for that area. If work is postponed the area shall be re-posted for another 3 working day period. The Contractor shall be responsible for informing all potentially affected businesses and agencies including transit operators and emergency service providers of the work that is to occur and the impact to vehicular movements. A list of these operators and emergency service providers will be provided at the pre-construction meeting.

The Contractor shall provide and maintain traffic control during all construction activities in accordance with the approved Traffic Control Plan. If the Contractor cannot provide and maintain traffic control as required, then the Engineer may direct the Contractor to provide, maintain, and/or update a full traffic control plan (signed by a registered Professional Engineer/Traffic Engineer), with no additional compensation.

The Contractor shall be responsible to keep pedestrian, bicycle, and vehicle traffic off concrete areas until concrete has properly cured. The Contractor shall be responsible for any touch-ups or removal/repours needed due to damage caused by trespassing.

The Contractor shall be responsible to keep traffic off the streets with newly installed slurry seal until the slurry seal is properly cured. The Contractor shall be responsible for any touch-ups or re-appplications needed due to traffic damage. Upon completing the application of slurry, the Contractor shall install signs DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 15 5/26/2022
within the applicable roadways indicating the following unless otherwise approved by the Engineer:
“Fresh Oil Paving. Slow Speeds Req’d. No Sharp Turns. No U-Turns.” Signs shall remain and be maintained until the slurry product cures (one week minimum).

When closures are made for work periods only, at the end of each work period all components of the traffic control system, except portable delineators placed along open trenches or excavation adjacent to the traveled way, shall be removed from the traveled way and shoulder.

The provisions in this section will not relieve the Contractor from his responsibility to provide such additional devices or take such measures as may be necessary to comply with the provisions in Section 7-1.09, "Public Safety" of the Standard Specifications.

If any component in the traffic control system is displaced or ceases to operate or function as specified, from any cause, during the progress of the work, the Contractor shall immediately repair said component to its original condition or replace said component and shall restore the component to its original location.

If, during the course of the work, the Engineer determines, in his sole discretion, that traffic control systems are not functioning adequately or as intended, he may order field revisions to be made to the system(s). Contractor shall make those ordered revisions and maintain those ordered revisions until further directed by the Engineer. All costs for revisions and maintenance of those revisions shall be included in the lump sum contract price described below. 10-2.3.1 Temporary Pavement Delineation and Markers
Temporary pavement delineation, including but not limited to raised flexible reflective tabs and/or reflective adhesion tape, shall be installed and maintained by the Contractor during or between construction stages and operations for the purpose of providing traffic control and public safety.

The specific type or method of temporary pavement delineation used by the Contractor shall be approved by the Engineer prior to application. Installation and maintenance of all temporary pavement delineation shall not be considered as “extra work”.

Temporary pavement delineation and markers shall be applied in all locations where existing markers and striping have been removed. The pavement markers shall be applied complete in place prior to opening the traveled way to public traffic. They shall be applied after existing striping removal. Immediately before permanent striping installation, temporary markers shall be removed in their entirety and shall not be cut at the pavement surface.

When using raised flexible reflective tabs or reflective adhesion tape for temporary pavement delineation along the direction of travel (longitudinal lines), temporary stripes shall be placed on the pavement surface at a 6 inch or 12 inch offset left of the proposed permanent pavement stripe. Prior to the application of the permanent stripe the Contractor shall remove the tabs or tape from the pavement surface. Removals must be coordinated with the labor force performing the permanent pavement delineation.

When reflective adhesive tape is used for lane delineation, a minimum of 3-foot strip of tape shall DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 16 5/26/2022
be placed at 12-foot intervals (gaps) regardless of the posted speed for the zone requiring temporary striping. When raised reflective tabs are used for lane delineation, the tab spacing shall not exceed 24 feet. Raised flexible reflective tabs shall not be utilized for limit lines (stop bars) or crosswalks without prior approval of the Engineer.

When temporary pavement delineation is needed on a roadway surface that has been grinded, temporary paint shall be utilized. Said temporary pavement delineation must match the alignment, spacing, color, and paint requirements of the permanent or previous pavement delineations. Contractor must maintain the visibility of the temporary paint and re-apply new coats as deemed necessary by the Engineer.

When temporary pavement delineation is needed on a roadway surface that has been slurried, the Contractor shall not use reflective adhesion tape or temporary paint. The Contractor shall use raised flexible reflective tabs that follow the alignment of the permanent paint. Prior to the application of the permanent stripe the Contractor shall remove the tabs from the pavement surface. Removals must be coordinated with the labor force performing the permanent pavement delineation.
10-2.3.2 Payment for Bid Item 3 – Traffic Control System The contract lump sum price paid for “Traffic Control System” shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in traffic control system, including placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control system, traffic handling plans, temporary pavement delineation and markers as required, Construction Area Signs, and Project Funding Signs, as specified in the Standard Specifications these Special Provisions and as shown on the project plans.
10-2.4 BID ITEM 4 – WATER POLLUTION CONTROL
The Contractor shall conform to all applicable local, state and Federal regulations and laws pertaining to water pollution control. The Contractor shall conduct and schedule operations and follow and implement Best Management Practices (BMPs) in such a manner as to prevent water pollution. The contractor shall take such measures as may be necessary to comply with the provisions in Part C, Section 1-1.2. 10-2.4.1 Payment for Bid Item 4 – Water Pollution Control The Contractor's cost of implementing the required BMP's for all project activities shall be included in the contract lump sum price paid for Water Pollution Control.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 17 5/26/2022
10-3.0 TECHNICAL SPECIFICATIONS FOR STREET REHABILITATION AND

PREVENTIVE MAINTENANCE
All items of work are to be installed or constructed as specified in the Standard Specifications, as shown on the plans, or as modified in these Special Provisions. Each item is listed with the corresponding sections of the Standard Specifications, which may apply thereto. These listings are not necessarily all of the sections which may apply and are not meant to exclude other sections which are not referred to specifically but do give direction to the work. These Special Provisions shall take precedence over the Plans.
10-3.1 Items of Work for Street Rehabilitation and Preventive Maintenance The following items of work fall into the category of Street Rehabilitation and Preventive Maintenance:
• Bid Items 5 – 8
10-3.2 General
All equipment and material that the Contractor proposes to install shall conform to these specifications and the contract plans. For convenience in designation on the Contract Documents, certain articles or materials to be incorporated in the work may be designated under a trade name or the name of a manufacturer and the manufacturer's catalogue information.

If these Special Provisions specify manufacturers’ names along with the term “City approved equal”, the use of an alternative article or material which is of equal or superior quality and of the required characteristics for the purpose intended will be permitted, subject to the following requirements:

The burden of proof as to the quality and suitability of alternatives shall be upon the Contractor, and the Contractor shall furnish all information necessary as required by the Engineer. The Engineer shall be the sole judge as to the quality and suitability of alternative articles or materials, and the Engineer's decision shall be final.

Whenever the Contract Documents permit the substitution of a similar or equivalent material or article, no tests or action relating to the acceptance of the substitute material will be made until the request for substitution is made in writing by the Contractor accompanied by complete data as to the equality of the material or article proposed. Request for such substitution shall be made in writing by the Contractor within thirty (30) days of the Notice to Proceed. Failure by the Contractor to request substitution within thirty (30) days of the Notice to Proceed constitutes an agreement by Contractor to furnish only the materials or equipment listed in the Contract Documents. Until and unless such substitutions are authorized in writing by the Engineer, no deviations from the specifications shall be allowed.
10-3.3 Reserved
10-3.4 Reserved
DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 18 5/26/2022
10-3.5 Bid Item 5 – Install Crack Fill/ Crack Repair
Pavement preparation shall consist of the following:

1. All cracks greater than 1/8" but less than 1/2" in width shall be routed to a minimum width of 1/2” and to a depth of 3/4" to 1" deep.

2. All cracks greater than 1/2” in width shall be routed to a depth of 3/4" to 1".

3. Seven days prior to the crack routing operation, all cracks with existing weeds or grasses shall be removed with a heat lance. Prior to the application of any sealant, all cracks shall be completely cleaned of deleterious material using a blower or an air compressor. All wedged-in materials that are not readily removed by air shall be removed by gouging or plowing. In addition, the street surface shall be completely cleaned of all pavement preparation debris by a power-driven street sweeper or other suitable means at the end of each work day.

4. All cracks less than 1" in width shall be filled with a Crafco Polyflex Type 3 Sealant or approved equal. Application shall be with a Heated Joint Seal Machine Crafco Model BC-220 or City approved equal and to the manufacturer's recommendation.

These may be obtained from Crafco Inc., P.O. Box 20133, Phoenix, Arizona 85036.

This treatment method shall be called "Crack Fill."

5. All cracks greater than 1" in width shall be filled with PG 64-16 asphalt concrete.

This treatment method shall be called "Crack Repair."

6. All "alligator" cracked areas of the pavement shall be discussed with the Engineer to determine a course of action.

7. Performing traffic control for all work described above unless otherwise unless otherwise included in the Bid Item “Traffic Control System.” 10-3.5.1 Treatment Locations
The specific areas that may require Crack Fill/Crack Repair are as follows:
 41st Street (San Pablo Avenue – Adeline Street)
 43rd Street (San Pablo Avenue – Adeline Street)
 45th Street (San Pablo Avenue – Adeline Street)
 47th Street (San Pablo Avenue – Adeline Street)
 48th Street (San Pablo Avenue – City Limits)
 Salem Street (43rd Street – 45th Street)
 Essex Street (43rd Street – 45th Street)
 Doyle Street (45th Street – Steve Dain Drive)
 Steve Dain Drive (Doyle Street – San Pablo Avenue)
The Engineer shall also identify locations in the field where crack sealant was not administered prior due to parked cars or other limiting factors. The Engineer shall also identify locations to be re-done where the crack sealant was poorly administered.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 19 5/26/2022
10-3.5.2 Payment
Payment for all required “Install Crack Fill/Repair” shall be at the Contract unit price per linear foot of application and shall include full compensation for all labor, materials, tools, equipment and incidentals required for crack treatment. 10-3.6 Bid Item 6 – Type II Slurry Seal
This item shall conform to Section 37-2 “Slurry Seal” of the Standard Specifications and as specified herein.

Black sand meeting the requirements in Section 37-2 “Slurry Seal” shall be used in the slurry seal mix design.

Emulsified asphalt shall be CQS-1h. The latex additive shall be ULTRAPAVE 65K or an approved equal. The latex shall be added at the emulsion plant after weighing the asphalt and before the addition of mixing water. The latex shall be added at a rate of 2% by weight of the asphalt emulsion. Contractor shall provide a certificate of compliance that the emulsion-aggregate slurry mix meets the requirements in the Standard Specifications and these Special Provisions.

The joint between the edge of pavement and the concrete gutter shall be sealed with slurry seal.

The slurry may overlap the concrete gutter edge no more than one (1) inch. If any slurry goes past the overlap limit, the Contractor shall make efforts to clean the gutter area. The edges of the slurry shall be maintained in a neat and uniform line.

The Contractor shall not allow any liquids used for cleanup of tools and equipment (such as diesel fuel or solvents) to spill on the pavement, curbs, gutter, parkways, or other improved areas. 10-3.6.1 Payment
Payment for this item shall be at the contract unit price per square foot of slurry seal installed and shall include full compensations for furnishing all labor, materials, tools, equipment, and incidentals for performing the work as described herein, and as directed by the City Engineer.
10-3.7 Bid Item 7 – Remove and Replace Pavement Section (8" Max) - Dig Out Locations
“Remove and Replace Pavement Section (8" Max) - Dig Out Locations” shall conform to the provisions in Section 15, “Existing Highway Facilities”, Section 19, “Earthwork” of the Standard Specifications and as detailed on the plans and these Special Provisions.

Where Dig Out quantities are indicated on the plans or in the quantity tables on the project plans, the actual locations will be marked out in the field by the Engineer during construction. Contractor shall meet with Engineer on each street and per field layout by the Engineer, the Contractor is to sawcut and remove existing asphalt concrete, paving reinforcement fabric, curb/gutter, Portland cement concrete, and/or existing base/subgrade material to a minimum depth of 8” from the existing surface and shall include compacting existing base material to a relative density of 95%. This item shall also include and all sawcutting necessary to create a clean, straight, vertical edge.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 20 5/26/2022
At each removal location where new DGAC will be placed, new Type B, PG 64-10 emulsion, 1/2” maximum asphalt concrete shall be placed to finished grade as described below within the same work shift of asphalt concrete removal.

The replacement asphalt for Dig Out Locations shall be completed utilizing a minimum of 3 lifts (1.5” minimum per lift) with the following criteria: the base course lift(s) shall be completed the same day as the completion of the Dig Out removal; and upon completion of the base course replacement pavement, the base course surface may only be 0.10’ minimum to 0.125’ maximum below the original asphalt surface elevations, and replaced within 5 working days after initial commencement of milling.

In areas where a Dig Out location will be behind a new curb, where an existing bulb-out planter is being extended/re-built, the Contractor is to sawcut and remove existing asphalt concrete, paving reinforcement fabric, curb/gutter, Portland cement concrete, and/or existing base/subgrade material as needed to form the new shape of the bulb-out planter. In these locations removals should be done to a minimum depth of 8” from the top of the new curb and shall include compacting existing base material to a relative density of 95%. Top Soil will be placed on top of the existing base material (see Bid Item 10).

The Contractor will provide traffic control so that the Engineer is able to field locate Dig Out repair locations within 5 working days of the completion of the grinding operations.

Minimum size of each Dig Out location will be 25 square feet and 5 feet minimum in width in any direction. Daily Dig Out repair removals shall be limited to the area that can be fully restored within the same shift so that all traffic lanes can be open at the end of each shift.

The Engineer reserves the right to suspend delivery of AC to the jobsite to ensure the AC placement operations are completed and the full traveled way is opened to traffic prior to the time limits specified in Part C, Section 1-5.0 “Maintaining Traffic” of these Special Provisions Where new pavement joins an existing pavement, the surface will be inspected for smoothness of the seam between the two surfaces. When a six feet long straightedge is laid across the seam between "new" and "old" pavement, the surface shall not vary more than 0.03 feet from the lower edge. At join lines along new concrete gutters or where the existing asphalt pavement has been removed, the finished surface shall not vary more than 0.00' to 0.05' higher than the concrete surface that is being joined. On existing or proposed bike routes the finished surface shall not exceed 0.02' above the gutter lip.
10-3.7.1 1/2” Asphalt Concrete Specifications
Asphalt Concrete shall be Type B and shall conform to the provisions of Section 39 “Asphalt Concrete“ of the Standard Specifications. At each Dig Out removal location and within the same workshift that material removal has occurred, new Type B, PG 64-10 emulsion, 1/2” maximum asphalt concrete conforming to the requirements of Section 92 “Asphalts” of the Standard Specifications shall be placed to a grade level with the surface that was ground.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 21 5/26/2022
Where an entire lane is getting paved, rather than smaller Dig Out area, paving edges and seams shall occur along lane lines only and not within the lane itself.

A paving machine that picks up the asphalt concrete material from a windrow then spreads the material to a specified thickness may be used. However, the Engineer may require the Contractor to use a paving machine which accepts the asphalt concrete material directly from the delivery truck, at no additional cost to the City, if the temperature of the asphalt concrete in the windrow cannot be maintained above the lower temperature limit specified in the Standard Specifications, or if the windrow blocks access to any driveway or side street for more than fifteen minutes prior to the paving machine spreading the asphalt concrete material.

The Engineer reserves the right to suspend delivery of AC to the jobsite to ensure the AC placement operations are completed and the full traveled way is opened to traffic prior to the time limits specified in Part C, Section 1-5.0 “Maintaining Traffic” of these Special Provisions.

Where new pavement joins an existing pavement, the surface will be inspected for smoothness of the seam between the two surfaces. When a six feet long straightedge is laid across the seam between "new" and "old" pavement, the surface shall not vary more than 0.03 feet from the lower edge. At join lines along new concrete gutters or where the existing asphalt pavement has been removed, the finished surface shall not vary more than 0.00' to 0.05' higher than the concrete surface that is being joined. On existing or proposed bike routes the finished surface shall not exceed 0.02' above the gutter lip.

The contractor shall note that many of the project streets are on “bicycle boulevards.” The riding surface will be tested for uniformity and smoothness. It is highlighted for the Contractor to maintain the uniformity and smoothness beyond just the driving surface to the edge of pavement areas as bicycles will use the entire paved surface. A “washer board” surface will result in rejection of the work.
10-3.7.2 Measurement
Measurement for payment of “Remove and Replace Pavement Section (8" Max) - Dig Out Locations” shall be by the square foot of Roadway Pavement Section removed and replaced as measured in the field and approved by the Engineer. 10-3.7.3 Payment
Payment for all required “Remove and Replace Pavement Section (8" Max) - Dig Out Locations” shall be at the contract unit price per square foot of Pavement Section removed in the locations located in the field, and as approved by the Engineer and shall include full compensation for furnishing all labor, materials, tools, equipment, sawcutting, subgrade compaction, tack coat placement, and asphalt concrete placement, hauling, disposal, permits, fees and incidentals for performing the work as described herein. 10-3.8 Bid Item 8 – Raised DGAC (1” Minimum)
This item shall include all work to install 1/2" Type B, PG 64-10 emulsion asphalt concrete conforming to the requirements of Section 92 “Asphalts” of the Standard Specifications for the 1” DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 22 5/26/2022
minimum thickness overlay at all truck turning apron locations identified adjacent to newly built PCC median curbs. The existing asphalt concrete shall be scored, and then new asphalt concrete overlaid on top with a 2:1 tapered edge meeting the existing surface elevations.

The Engineer reserves the right to suspend delivery of AC to the jobsite to ensure the AC placement operations are completed and the full traveled way is opened to traffic prior to the time limits specified in Part C, Section 1-5.0 “Maintaining Traffic” of these Special Provisions.

The contractor shall note that the riding surface will be tested for uniformity and smoothness. A “washer board” surface will result in rejection of the work. 10-3.8.1 Payment
Payment shall be at the contract unit price per ton of 1/2” Asphalt Concrete furnished and placed and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, including asphalt concrete, tack coat and paint binder placement.

Payment for all required “Raised DGAC (1” Minimum)” shall be at the contract unit price per square foot of truck apron locations shown on the plan, and as approved by the Engineer and shall include full compensation for furnishing all labor, materials, tools, equipment, scoring, tack coat placement, and asphalt concrete placement, hauling, disposal, permits, fees and incidentals for performing the work as described herein. 10-3.9 Bid Item 9 – Adjust Valves and Covers to Grade
This item includes, but is not limited to, the adjustment of EBMUD gate valves/covers (where warranted) within new slurry seal areas.

The East Bay Municipal Utility District will supply new water valve can and covers to the Contractor for installation. Coordination with EBMUD of such is included in the work of Bid Item 11. Contact information and address for equipment pickup will be provided at the pre-construction meeting.

EBMUD installation detail is provided in Part D – Supplemental Documents.

The Contractor shall adjust water valve frames and covers and water gate valve covers to range from flush to 1/4" above the finished grade of the adjacent pavement. All dirt and debris are to be removed from the valve box to a depth of 6" below the operating nut.

Exposed covers, lids and boxes shall be made safe for vehicular, bicycle and pedestrian traffic passage.
10-3.9.1 Bid Item 11 Payment
The East Bay Municipal Utility District will supply new water valve can and covers to the Contractor for installation. Full compensation for furnishing all labor, miscellaneous materials, tools, equipment, and incidentals, and for doing all the work involved in adjusting frames and covers to grade, shall be included in the contract unit price paid for each adjust frame and cover to grade, as shown on the plans, as specified in the Standard Specifications, and these Special Provisions, and as directed by the Engineer.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 23 5/26/2022
10-3.10 Bid Item 10 – Top Soil

Topsoil shall be Class "A” in accordance with the requirements of the Green Book, Section 800-

1.1.2 Class "A" topsoil. Soil to be used as a planting medium shall be fertile, well drained, of uniform quality, and free of stones over 1” diameter, sticks, oils, chemicals, plaster, concrete, or other deleterious materials.

Top Soil shall be placed on top of the existing compacted soil in bulb-out planter areas. The Top Soil shall be placed at a depth of 8” in order to match existing soil height in the rest of the existing bulb-out planter. Contractor shall spread imported topsoil to a uniform thickness in existing and newly created planter areas.
10-3.10.1 Payment
Payment for all required “Top Soil” shall be at the contract unit price per square foot of Top Soil placed in area identified on the plans, and as approved by the Engineer and shall include full compensation for furnishing all labor, materials, tools, equipment, subgrade compaction, spreading, placement, hauling, disposal, permits, fees and incidentals for performing the work as described herein.
10-3.11 Items of Work for Portland Cement Concrete Facilities The following items of work fall into the category of Portland Cement Concrete Facilities:
• Bid Items 11 - 14
10-3.11.1 Portland Cement Concrete
Removal of existing PCC shall conform to the provisions in Section 15, “Existing Highway Facilities”, and Section 19, “Earthwork” of the Standard Specifications as detailed on the plans and these Special Provisions. PCC median curbs, curbs, gutters, and curb ramps shall conform to the provisions in Section 73 "Concrete Curbs and Sidewalks," of the Standard Specifications, C.C.R. Title 24, and these Special Provisions. The work of this item shall include constructing median curbs, curbs, gutters, and curb ramps and any required PCC replacement in accordance with the project plans and the Standard Plans.

Aggregate base shall conform to the provisions of Section 26, “Aggregate Bases” of the Standard Specifications. These items of work shall include 4” of ¾” Class 2 Aggregate Base beneath new Portland cement concrete. Aggregate base shall be included and paid for with these items of work.

PCC mix design shall be ¾-inch, 4,000 psi, with 1.5 pounds of lampblack per cubic yard, or equivalent, shall be added to each batch of concrete.

Curb ramp slopes are to be installed in accordance with Caltrans Standard Plan A88A, C.C.R.

Tile 24 and these Special Provisions. Adjustment of grades and ramp dimensions in order to comply with these requirements shall be performed prior to the placing of concrete. Where curb and gutter (including curb ramp areas) is to be removed and replaced, the Contractor DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 24 5/26/2022
shall also remove a minimum of 12" width of existing pavement to facilitate the setting of forms and compaction of backfill. Additional width of pavement replacement may be necessary in order to comply with ADA maximum 5% cross fall. Paving replacement shall be 6" minimum (or match existing, whichever is greater) full depth AC.

The removal and replacement of C&G shall also include all removal and replacement of minimum of 12" width of existing pavement adjacent to the gutter. Paving replacement shall be 6" minimum (or match existing, whichever is greater) full depth AC. Curb and gutter shall be poured independent (separate) of driveways, curb ramps and sidewalks. When the grade of C&G is less than 0.4%, the Contractor, at no additional cost, shall place (2) #3 reinforcing bars in the gutter. Construction stakes for curbs with flatter grades than 0.4% shall be every 12.5'.

The construction of PCC median curb shall also include all removal and replacement of minimum of 12" width of existing pavement adjacent to the curb. Paving replacement shall be 6" minimum (or match existing, whichever is greater) full depth AC.

Existing curb, gutter, sidewalk, and ramps shall be saw-cut to full depth of PCC prior to removal. Typical PCC thickness is approximately 3-4 inches for existing sidewalks. Contractor shall use vacuums or other means approved by the City Engineer to prevent water used for saw-cutting from entering the storm drain system.

Contractor shall remove and replace existing concrete sidewalk in the locations as indicated on the plans as being new sidewalk areas, and as reasonably directed by the Engineer in order to have curb ramps and wings conform to existing sidewalk areas. The removed material shall become the property of the Contractor and shall be disposed of off the site at a legal recycling facility. No PCC removal shall occur prior to review and approval of the removal limits by the City’s Representative. The existing base material shall be compacted to 90% relative density prior to installing the new facilities. PCC sidewalk sections shall be poured separate from the curb and gutter and shall be 4 inches thick. New sidewalk constructed in areas of existing sidewalk shall be scored to match the existing or adjacent sidewalks score pattern. Failure to score the sidewalk appropriately shall be cause for rejection.

Any water meter boxes, water valve boxes, gas valve boxes, curb face roof leader drains, and monitoring well boxes shall be adjusted to the new grades if within the limits of these items and shall be included with these items of work. Damage to existing facilities during the course of work shall be repaired, the cost of which is included in the bid item prices for the associated items of work.

Truncated domes shall be federal yellow TecWay Dome Tiles available from Stronggo LLC conforming to the requirements of C.C.R. Title 24 and as approved by the City Engineer. The truncated dome panel shall be installed by “wet set” method. Truncated domes shall be furnished and installed by the Contractor at the ramp of any newly installed curb ramp (or as needed on driveways), indicating the boundary between pedestrian and vehicular routes where there is a flush instead of a curbed connection. Contractor shall confirm placement of truncated domes with Engineer prior to final installation.

It is the Contractor’s responsibility to mark the approximate saw cut limits for the construction DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 25 5/26/2022
of pedestrian ramps including asphalt pavement areas. The Engineer shall review the marked limits before any removals. If the Engineer requests additional removals, then the Contractor must adjust the limits as necessary. No survey work or staking will be provided by the City for pedestrian ramps, curb, gutter, driveway, and sidewalk construction or replacement.

In areas where street trees are present, 3/4-inch clean crushed drain rock shall be used, be the product of crushing rock or gravel, and shall conform to the provisions of Paragraph 68-

1.025 “Permeable Material” of the Standard Specifications. This work shall also consist of removing the existing aggregate base or other existing base material where directed by the Engineer and installing 4 inches of 3/4-inch clean crushed drain rock beneath PCC Sidewalk in locations directed by the City Engineer. No recycled material shall be accepted. Drain rock shall be topped with Filter Fabric (mirafi 140N non-woven or approved equal).

When tree roots are found within the excavated area, the Contractor shall be responsible for coordinating and cooperating with the City’s Arborist, and shall be required to take extra precaution when removing existing base material to protect tree roots as needed and prune tree roots as directed by the City’s Arborist.

The Contractor shall take measures to prevent graffiti, footprints, tire marks, etc., in the fresh concrete. The Contractor shall be responsible for all markings and failure to do so shall be cause for rejection.
10-3.11.2 Payment for Bid Item 11 – 4” Median Curb and PCC Full compensation for furnishing all labor, materials, tools, equipment, permits, incidentals, and for doing all the work involved in constructing 4” Median Curb and PCC, shall be included in the contract unit price per square foot, as shown on the plans, as specified in the Standard Plans and Specifications, and these Special Provisions, and as directed by the Engineer.

Payment includes hauling and disposal of the removed material.

Payment for “4” Median Curb and PCC” shall also include the removal and replacement of a minimum 12" width of existing roadway section, curb/gutter, and other bulb-out planters to facilitate the setting of forms and compaction of backfill. Payment also includes clearing and grubbing of any miscellaneous tree roots or weeds in replacement areas. The Contractor shall pour all new concrete within five (5) calendar days upon commencement of any removals for the above-described work.
10-3.11.3 Payment for Bid Item 12 – 6” Median Curb and PCC Full compensation for furnishing all labor, materials, tools, equipment, permits, incidentals, and for doing all the work involved in constructing 6” Median Curb and PCC, shall be included in the contract unit price per square foot, as shown on the plans, as specified in the Standard Plans and Specifications, and these Special Provisions, and as directed by the Engineer.

Payment includes hauling and disposal of the removed material.

Payment for “6” Median Curb and PCC” shall also include the removal and replacement of a minimum 12" width of existing roadway section, curb/gutter, and other bulb-out planters to facilitate the setting of forms and compaction of backfill. Payment also includes clearing and grubbing of any miscellaneous tree roots or weeds in replacement areas. The Contractor shall pour all new concrete within five (5) calendar days upon commencement of any removals for DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 26 5/26/2022
the above-described work.
10-3.11.4 Payment for Bid Item 13 – 6” Curb and Gutter
Full compensation for furnishing all labor, materials, tools, equipment, permits, incidentals, and for doing all the work involved in constructing 6” Curb and Gutter, shall be included in the contract unit price per linear foot, as shown on the plans, as specified in the Standard Plans and Specifications, and these Special Provisions, and as directed by the Engineer.

Payment includes hauling and disposal of the removed material.

Payment for “6” Curb and Gutter” shall also include the removal and replacement of a minimum 12" width of existing roadway section, curb/gutter, and other concrete features to facilitate the setting of forms and compaction of backfill. Payment also includes clearing and grubbing of any miscellaneous tree roots or weeds in replacement areas. The Contractor shall pour all new concrete within five (5) calendar days upon commencement of any removals for the above-described work.
10-3.11.5 Payment for Bid Item 14 – PCC Curb Ramp
Full compensation for furnishing all labor, materials, tools, equipment, truncated dome, permits, incidentals, and for doing all the work involved in constructing PCC Curb Ramp, shall be included in the contract unit price paid for each PCC Curb Ramp, as shown on the plans, as specified in the Standard Plans and Specifications, and these Special Provisions, and as directed by the Engineer. Payment includes hauling and disposal of the removed material.

Payment for PCC Curb Ramp construction shall include payment for the removal and replacement of curb, gutter, sidewalk (to the nearest joint), any sidewalk match ups, ramp, or landings (to comply with ADA), pavement removal and replacement (to comply with the maximum 5% cross fall) and any landscaping and irrigation repair, adjustment or replacement as necessary. Payment also includes construction of retaining curb, as necessary, to protect any existing improvements at the direction of the Engineer for any type of ramp regardless if retaining curb is shown or not shown on the standard drawing. Payment for PCC Curb Ramp construction shall also include adjusting of pull boxes and water meter boxes when they are located with any portion of the wheelchair ramp. Payment shall also include cost to furnish and install truncated domes. The Contractor shall pour all new concrete within five (5) calendar days upon commencement of any removals for the above-described work.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 27 5/26/2022
10-4.0 TECHNICAL SPECIFICATIONS FOR TRAFFIC STRIPING, CURB &

PAVEMENT MARKINGS, PAVEMENT MARKERS, AND PERMANENT TRAFFIC CONTROL

DEVICES
All items of work are to be installed or constructed as specified in the Standard Specifications, as shown on the plans, or as modified in these Special Provisions. Each item is listed with the corresponding sections of the Standard Specifications, which may apply thereto. These listings are not necessarily all of the sections which may apply and are not meant to exclude other sections which are not referred to specifically but do give direction to the work. These Special Provisions shall take precedence over the Plans.
10-4.1 General
Striping and pavement markings shall conform to Section 84 “Markings” of the State Standard Specifications. Pavement Markings shall conform to State Standard Plan A24A-D. Pavement markers and delineators shall conform to Section 81 “Miscellaneous Traffic Control Devices” of the State Standard Specifications.

Cat-tracking shall be placed within 48 hours from the completion of asphalt overlay or slurry curing period is complete, unless otherwise authorized by the Engineer. When cat-tracking is complete, Contractor shall submit a request for approval of cat-tracking to Engineer. Contractor shall allow 2 working days for cat-track approval. Striping installation shall commence within 2 working days of cat-track approval.

Temporary pavement delineation and markers shall conform to the requirements specified in Part C, Section 10-2.3.1. Temporary pavement delineation and markers shall be applied in all locations where existing markers and striping have been removed. The pavement markers shall be applied complete in place prior to opening the traveled way to public traffic. They shall be applied after existing striping removal and after slurry seal application. Immediately prior to slurry seal application and again immediately before permanent striping installation, temporary markers shall be removed in their entirety and shall not be cut at the pavement surface.

Temporary pavement delineation and markers shall be installed and maintained until new striping is in place. All temporary traffic stripes and pavement markings shall be removed by the Contractor on the same day as placement of the permanent striping and markings. 10-4.2 Substitutions
Equipment and material that the Contractor proposes to install shall conform to these specifications and the contract plans. For convenience in designation on the Contract Documents, certain articles or materials to be incorporated in the work may be designated under a trade name or the name of a manufacturer and the manufacturer's catalogue information.

If these Special Provisions specify manufacturers’ names along with the term “or approved equal”, the use of an alternative article or material which is of equal or superior quality and of the required characteristics for the purpose intended will be permitted, subject to the following requirements:

The burden of proof as to the quality and suitability of alternatives shall be upon the Contractor, DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 28 5/26/2022
and the Contractor shall furnish all information necessary as required by the Engineer. The Engineer shall be the sole judge as to the quality and suitability of alternative articles or materials, and the Engineer's decision shall be final.

Whenever the Contract Documents permit the substitution of a similar or equivalent material or article, no tests or action relating to the acceptance of the substitute material will be made until the request for substitution is made in writing by the Contractor accompanied by complete data as to the equality of the material or article proposed. Request for such substitution shall be made in writing by the Contractor within thirty (30) days of the Notice to Proceed. Failure by the Contractor to request substitution within thirty (30) days of the Notice to Proceed constitutes an agreement by Contractor to furnish only the materials or equipment listed in the Contract Documents. Until and unless such substitutions are authorized in writing by the Engineer, no deviations from the specifications shall be allowed.
10-4.3 – 10-4.14 Reserved
10-4.15 Items of Work for Permanent Traffic Control Devices The following items of work fall into the category of Permanent Traffic Control Devices:
• Bid Items 15 - 18
10-4.15.1 Permanent Traffic Control Devices
K72 marker post shall be as manufactured by US Reflector, or approved equal.

Flexible Mount Delineator shall be model TM 750 RB B in white as manufactured by Flexstake, or approved equal.

Slotted speed cushion shall be recycled rubber speed cushion as manufactured by Traffic Logix, or approved equal.

Wheel Stop shall be Grainger Parking Curb, Rubber, 3 ft x 4 in x 6 in, Black/Yellow, or approved equal.

Contractor shall install all permanent traffic control devices under manufacturer’s instructions.
10-4.15.2 Measurement
a. K72 Marker Post will be measured for pay per each by actual count of K72 marker posts installed.
b. Flexible delineator will be measured for pay per each by actual count of flexible delineators installed.
c. Slotted speed cushion will be measured for pay per each by actual count of speed cushion installed.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 29 5/26/2022
d. Wheel Stop will be measured for pay per each by actual count of wheel stops installed. 10-4.15.3 Payment
Payment for permanent traffic control devices will be made at the respective contract price per each and shall include furnishing all labor, material, tools, equipment, traffic control, and incidentals necessary to provide the permanent traffic control devices as shown on the plans.
10-4.16 – 10-4.18 Reserved

10.4.19 Items of Work for Thermoplastic Pavement Delineation and Markings The following items of work fall into the category of Thermoplastic Pavement Delineation and Markings:
• Bid Items 19-35
10-4.19.1 General
Unless otherwise noted, Thermoplastic paint and markings shall be utilized for the project.

Thermoplastic shall be enhanced wet-night visibility thermoplastic.

The thermoplastic material for stripes shall be applied by extrusion method in a single uniform layer. Stencils shall be used when applying thermoplastic material for pavement markings. The pavement surface to which thermoplastic material is applied shall be completely coated by the material and the voids of the pavement surface shall be filled.

When continental crosswalks are shown on the Plans, the stripes shall be laid out parallel with the direction of traffic crossing the stripes with gaps positioned in wheel tracks.

Apply thermoplastic with enhanced wet-night visibility at a maximum speed of 8 mph.

Apply enhanced wet-night visibility stripe at a rate of at least 0.38 lb of thermoplastic per foot of 4-inch-wide solid stripe. The applied thermoplastic traffic stripe must be at least

0.090 inch thick.

Apply thermoplastic with enhanced wet-night visibility for a traffic stripe at a rate of at least 0.47 lb of thermoplastic per foot of 6-inch-wide solid stripe. The applied stripe must be at least 0.090 inch thick.

Apply thermoplastic with enhanced wet-night visibility for a pavement marking at a rate of at least 1.06 lb of thermoplastic per square foot of marking. The applied pavement marking must be at least 0.100 inch thick.
10-4.19.2 Measurement
Traffic stripes will be measured for pay by the linear foot without deduction for gaps in the broken traffic stripes. Striping details having double stripes consisting of two 6-inchwide yellow stripes separated by a 3-inch-wide gap is measured as a single traffic stripe.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 30 5/26/2022
Pavement markings will be measured for pay by the area covered in square feet. 10-4.19.3 Payment
Payment for Thermoplastic Pavement Delineation and Markings will be made at the respective contract unit prices and shall include furnishing all labor, material, tools, equipment, traffic control, and incidentals necessary for striping and pavement markings as shown on the plans and/or as directed by the Engineer.

Payment for pavement markers associated with striping details will be included in the contract unit prices paid for the associated striping detail and no additional payment shall be made therefor.

Payment for temporary pavement delineation and markers shall be considered as included in the contract lump sum price paid for “Traffic Control System”. Temporary and/or permanent pavement delineation performed by the Contractor at the direction of Engineer for reasons or circumstances beyond the Contractor's control (excluding weather related construction delays) shall be considered as “extra work”. 10-4.20 – 10-4.35 Reserved

10.4.36 Items of Work for Preformed Pavement Delineation and Markings The following items of work fall into the category of Preformed Pavement Markings:
• Bid Items 36-39
10-4.36.1 General
Where markings are shown as pre-formed, material must be Ennis-Flint PreMark with Vizigrip or approved equal.

The markings must be a resilient white or light green color thermoplastic product, the surface of which must contain glass beads and abrasives optimizing both skid resistance and retroreflectivity. The markings must be resistant to the detrimental effects of motor fuels, lubricants, hydraulic fluids, etc.

The material shall be capable of being affixed to bituminous and/or Portland cement concrete pavements using the normal heat of a propane torch or infrared heater.

The markings must be capable of conforming to pavement contours, breaks and faults through the action of traffic at normal pavement temperatures. The markings shall have resealing characteristics, such that it is capable of fusing with itself and previously applied thermoplastic when heated with the torch.

The markings shall not have minimum ambient and road temperature requirements for application, storage, or handling.

If manufacturer’s standard application procedures require the use of a 2-component sealer, the material shall be capable of being applied with a compatible 2-component DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 31 5/26/2022
sealer recommended by the manufacturer, at minimum ambient and surface temperatures of 45⁰F without any special storage, preheating or treatment of the material before application.

Material must be composed of an ester modified rosin resistant to degradation by motor fuels, lubricants etc. in conjunction with aggregates, pigments, binders, abrasives, and glass beads which have been factory produced as a finished product, and meets the requirements of the current edition of the Manual on Uniform Traffic Control Devices for Streets and Highways. The thermoplastic material conforms to AASHTO designation M249, with the exception of the relevant differences due to the material being supplied in a preformed state and being supplied in a color other than white or yellow.

Graded Glass Beads
The material must contain a minimum of thirty percent (30%) intermixed graded glass beads by weight. The intermixed beads shall conform to AASHTO designation M247, with minimum 80% true spheres and minimum refractive index of 1.50.

The material must have factory applied coated surface beads and abrasives in addition to the intermixed beads at a rate of 1/2 lb. [± 20%] per 11 sq. ft. The surface beads and abrasives must be applied in an alternating arrangement across the surface of the material so that the surface is covered in what is best described as a “checkerboard” pattern of glass beads and abrasive materials. The abrasive material must have a minimum hardness of 9 (Mohs scale). The factory applied coated surface beads shall have a minimum of 80% true spheres, minimum refractive index of 1.50, and meet the following gradation:

Size Gradation
US Retained, % Passing, %
Mesh Um
12 1700 0 - 2% 98 - 100%
14 1400 0 - 6% 94 - 100%
16 1180 1 - 21% 79 – 99%
18 1000 28 - 62% 38 - 72%
20 850 62 - 71% 29 – 38%
30 600 67 - 77% 23 - 33%
50 300 86 - 95% 5 – 14%
80 200 97-100% 0 - 3%
Light Green Pigment
The material shall be manufactured with appropriate pigment to ensure that the resulting colors complies with the Light Green color as specified in the FHWA Memorandum dated April 15th, 2011: Interim Approval for Optional Use of Green Colored Pavement for Bike Lanes (IA-14).

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 32 5/26/2022

Daytime Chromaticity Coordinates for the Color Used for Green Colored Pavement 1 2 3 4
X y x y x y x y

0.230 0.754 0.266 0.500 0.367 0.500 0.444 0.555
Nighttime Chromaticity Coordinates for the Color Used for Green Colored Pavement 1 2 3 4
X y x y x y x y

0.230 0.754 0.336 0.540 0.450 0.500 0.479 0.520
The pigment system must not contain heavy metals or any carcinogen, as defined in 29 CFR 1910.1200 in amounts exceeding permissible limits as specified in relevant Federal Regulations.

White Pigment
The material shall be manufactured with sufficient titanium dioxide pigment to meet FHWA Docket No. FHWA-99-6190 Table 5 and Table 6 as revised and corrected.

Heating indicators
The top surface of the Vizigrip Premark material (same side as the factory applied surface beads/abrasives) shall have regularly spaced indents. The closing of these indents during application, shall act as a visual cue that the material has reached a molten state allowing for satisfactory adhesion and proper bead and abrasives embedment, and as a postapplication visual cue that the application procedures have been followed. Alternative products proposed for approved use must have a visual indicator of proper adhesion.

Skid Resistance
The surface of the preformed thermoplastic material shall contain factory applied non-skid material with a minimum hardness of 9 (Mohs scale). Upon application the material shall provide a minimum skid resistance value of 60 BPN when tested according to ASTM E 303.

Thickness: The material must be supplied at a minimum thickness of 90 mils for white stripe and 125 mils for green marking and white legends.

Retroreflectivity
Green material, when applied in accordance with manufacturer’s guidelines, must demonstrate a uniform level of sufficient nighttime retroreflection when tested in accordance to ASTM E 1710. The applied material must have an initial minimum intensity reading of 50 mcd·m-2·lx-1, as measured with a Delta pavement marking retroreflectometer.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 33 5/26/2022
White material, when applied in accordance with manufacturer’s guidelines, must demonstrate a uniform level of sufficient nighttime retroreflection when tested in accordance to ASTM E 1710. The applied material must have an initial minimum intensity reading of 275 mcd·m-2·lx-1 for white, as measured with a Delta pavement marking retroreflectometer.

Environmental Resistance
The material must be resistant to deterioration due to exposure to sunlight, water, salt or adverse weather conditions and impervious to oil and gasoline.

Abrasives
Apply abrasives and surface beads per manufacturer’s instructions. The abrasive material must have a minimum hardness of 9 (Mohs scale).

Packaging
The preformed thermoplastic markings shall be stored to prevent damage in transit and from weather.

Application of Pre-Formed Thermoplastic Pavement Markings The materials shall be applied to asphalt using the propane torch or infrared heater method recommended by the manufacturer, without minimum requirements for ambient and road temperatures and without any preheating of the pavement to a specific temperature. The material must be able to be applied without the use of a thermometer.

The pavement shall be clean, dry and free of debris. Supplier must enclose application instructions in English and Spanish with each box/package only pertaining to an application method that does not require preheating of the pavement to a specific temperature before application. For green marking, apply 2-component sealer to the substrate prior to material application, to ensure proper adhesion and provide bond reinforcement. No sealer is required for white marking application on asphalt.

If material must be applied to a concrete surface, use the same application procedure described under Section 3.1.A, except a single-component sealer must be applied before application of white markings to assure proper adhesion.

Pre-formed sheets shall be laid out and applied so that edges of adjacent sheets fit snugly together, the pattern of the marking aligns properly from sheet to sheet, and to prevent overlap of adjacent sheets.

Sealer’s method of application and rates shall be per the manufacturer’s recommendations. Sealer shall be applied only after the application area has been cleaned thoroughly. All loose particles shall be removed utilizing a power blow, compressed air, or street sweeper.

If the thermoplastic material loses its skid-resistance because the top application of skidresistant elements and beads completely sinks into the thermoplastic material during the application process, Contractor shall hand- apply surface beads and skid-resistant elements to pavement markings as required to restore the skid- resistance of the DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 34 5/26/2022
thermoplastic material. Surface beads and skid- resistant elements shall be as approved and as supplied by the thermoplastic pavement marker manufacturer and applied at rate recommended by the manufacturer.
10-4.36.1 Measurement
Pre-formed pavement markings will be measured for pay by the area covered in square feet.
10-4.36.2 Payment
Payment for Preformed Thermoplastic Pavement Marking installation will be made at the contract price per square foot and shall include furnishing all labor, material, tools, equipment, traffic control, and incidentals necessary to apply the pre-formed pavement markings as shown on the plans.
10-4.37 – 10-4.39 Reserved
10-4.40 Bid Item 40 - Paint Parking Tips (2-coat)
Parking tips shall comply with the requirements for painted traffic stripes and pavement markings in section 84 of the Caltrans Standard Specifications.
10-4.40.1 Measurement
Parking tips (2-coat) will be measured for pay per each by the number of tips installed. 10-4.40.2 Payment
Payment for parking tips (2-coat) will be made at the contract price per each and shall include furnishing all labor, material, tools, equipment, traffic control, and incidentals necessary for parking tips (2-coats) as shown on the plans.

10.4.41 Items of Work for Painting Curb
The following items of work fall into the category of Pre-Formed Delineation:
• Bid Items 41-44
10-4.41.1 General
Painting concrete curb as shown shall comply with section 78, “Incidental Construction” of the State Standard Specifications.

Paint curb color as shown on plans in color specified (2-coats). 10-4.41.1 Measurement
Paint Concrete Curb will be measured for pay by the length of curb painted in linear feet. 10-4.41.2 Payment
Payment for Paint Curb Items 41-44 will be made at the contract price per linear foot and shall include furnishing all labor, material, tools, equipment, traffic control, and incidentals necessary to paint concrete curb as shown on the plans.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 35 5/26/2022
10-4.45 Bid Item 45 – Remove Existing Striping, Markings, and Markers All slurry areas will require removal of existing painted or thermoplastic striping, markings, and pavement markers prior to application of slurry.

All painted striping removals including traffic stripes, markers, markings, legends and other striping details shall be removed by wet sandblasting. The residue including dust shall be removed immediately after contact between the sand and the surface being treated. Such removal shall be by a vacuum attachment operating concurrently with the blast cleaning or sandblasting operation. If the roadway is not being resurfaced, then Contractor shall completely cover the scarred area by applying asphaltic emulsion conforming to Section 94 of the Caltrans Standard Specifications. The asphaltic emulsion shall be used to seal and protect the existing asphalt surface and reduce raveling due to the striping removals.

All thermoplastic striping removals including traffic stripes, markers, markings, legends and other striping details shall be removed by grinding method (micro-planer method, or City approved equal). The residue including dust shall be removed immediately by sweeping. If the roadway is not being resurfaced, then Contractor shall completely cover the scarred area by applying asphaltic emulsion conforming to Section 94 of the Caltrans Standard Specifications. The asphaltic emulsion shall be used to seal and protect the existing asphalt surface and reduce raveling due to the striping removals.

The Contractor shall conduct his work so as not to damage existing asphalt pavement or concrete pavement. Any resultant damage determined to be excessive by the Engineer shall be repaired in kind by the Contractor at the Contractor’s sole expense. Depth of pavement scarring shall not exceed 2mm. If depth of pavement scarring exceeds 2mm and is determined to be too great by the Engineer, then the Contractor shall repair the pavement at own expense and no additional payment shall be made therefor.

Before obliterating any pavement delineation (traffic stripes, pavement markings, and pavement markers) that is to be replaced on the same alignment and location the pavement delineation shall be referenced by the Contractor, with a sufficient number of control points to reestablish the alignment and location of the new pavement delineation. The references shall include the limits or changes in striping pattern, including 1 and 2-way barrier lines, limit lines, crosswalks and other pavement markings. The “in-kind” striping layout measurements shall be submitted to the Engineer for approval prior to any removals taking place.

Temporary pavement delineation and markers shall conform to the requirements specified in Part C, Section 10-2.3.1. Temporary pavement delineation and markers shall be applied in all locations where existing markers and striping have been removed. The pavement markers shall be applied complete in place prior to opening the traveled way to public traffic. They shall be applied after existing striping removal. Immediately before permanent striping installation, temporary markers shall be removed in their entirety and shall not be cut at the pavement surface.

Temporary pavement delineation and markers shall be installed and maintained until new striping is in place. All temporary traffic stripes and pavement markings shall be removed by the Contractor on the same day as placement of the permanent striping and markings. Payment for temporary delineation and markers is covered in the item of work for “Traffic Control System”.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 36 5/26/2022
10-4.45.2 Payment
Payment for bid item “Remove Existing Striping, Markings, and Markers” shall be paid for at the Contract lump sum price, and shall include furnishing all labor, material, tools, equipment, traffic control, and incidentals necessary to measure and then remove the pavement markers, markings, and striping. No additional payment shall be made therefor.

Payment for wet sandblasting, micro-grinding, and/or fog sealing shall also be included in the Contract lump sum price paid for “Remove Existing Striping, Markings, and Markers,” and no additional payment shall be made therefor. Depth of pavement scarring shall not exceed 2mm. If depth of pavement scarring exceeds 2mm and is determined to be too great by the Engineer, then Contractor shall repair the pavement at own expense and no additional payment shall be made therefor.

Payment for temporary pavement delineation and markers shall be considered as included in the contract lump sum price paid for “Traffic Control System”. Temporary and/or permanent pavement delineation performed by the Contractor at the direction of Engineer for reasons or circumstances beyond the Contractor's control (excluding weather related construction delays) shall be considered as “extra work”.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 37 5/26/2022
10-5.0 TECHNICAL SPECIFICATIONS FOR ROADSIDE SIGNS
All items of work are to be installed or constructed as specified in the Standard Specifications, as shown on the plans, or as modified in these Special Provisions. Each item is listed with the corresponding sections of the Standard Specifications, which may apply thereto. These listings are not necessarily all of the sections which may apply and are not meant to exclude other sections which are not referred to specifically but do give direction to the work. These Special Provisions shall take precedence over the Plans.
10-5.1 – 10-5.45 Reserved

10.5.46 Items of Work for Roadside Signs
The following items of work fall into the category of Roadside Signs:
• Bid Items 46 - 52
10-5.46.1 General
Aluminum sign panels must comply with section 82, “Signs and Markers,” of the State Standard Specifications.

Installing sign includes installation of sign panel and providing mounting hardware, back braces, and straps and saddle brackets.

The sign panel must not be chipped or bent. Retroreflective sheeting shall be 3M Diamond Grade DG3 (ASTM XI) or approved equal with protective graffiti film. Warning signs shall have a fluorescent yellow background and school signs shall have a fluorescent yellowgreen background. Sign and post installation shall be as shown.

Except for Remove Sign Panel, relocating or removing signs includes removal of post and abandonment of existing post foundation. Relocation and removal must comply with section 15, “Existing Facilities,” of the State Standard Specifications.

Remove signs only when replacement signs are installed or when the existing signs are no longer required for traffic. Relocate each roadside sign the same day it is removed.

Sign post installation includes foundation and bracket. Foundation shall be minor concrete.

If sidewalk is damaged during post installation, Contractor is responsible for replacement of entire sidewalk panel.
10-5.46.2 Measurement
a. Furnishing aluminum sign panels will be measured for pay per square foot of sign panel.
b. Install Sign Panel (SSBM) will be measured for pay by the actual count of new sign panels mounted using SSBM method.
c. Install Sign Panel (Existing Post) will be measured for pay by the actual count of DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part C, Page 38 5/26/2022
new sign panels mounted on existing posts.
d. Install Sign (New Post) will be measured for pay per post installed. One post with one or more new sign panels mounted on it will be counted as one unit. e. Remove Existing Post will be measured for pay per post removed. f. Remove Sign Panel will be measured for pay by actual count of panels removed. g. Relocate Sign Panel to new Pole will be measured for pay by actual count of panels relocated.
10-5.46.3 Payment
Payment for Furnish Single-Sheet Aluminum Sign Panel (0.063" Unframed) will be made at the contract price square foot and shall include furnishing all labor, material, tools, equipment, and incidentals necessary to furnish sign panels as shown on the plans.

Payment for signs will be made at the respective contract price per each and shall include furnishing all labor, material, tools, equipment, traffic control, and incidentals necessary to provide, remove and relocate signs as shown on the plans.

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 EPW - 21102 Part D, Page 1 5/26/2022
PART D

SUPPLEMENTAL DOCUMENTS
FOR

ANNUAL STREET REHABILITATION AND

PREVENTIVE MAINTENANCE PROJECT
FISCAL YEAR 2021/2022
PROJECT NO. EPW-21102

DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865 DocuSign Envelope ID: D00A8993-CFBD-4DC4-AA2D-F7CACAE72865

← All documents from this meeting