6.03 Final Inspection
A. After all of the Goods have been incorporated into Owner's project, inspected, tested and functioning as specified and intended, and all Services have been furnished, Project Manager will make a final inspection with Owner and Supplier and will notify Supplier whether or not the Goods appear to be acceptable in accordance with the Procurement Documents. If not so acceptable, Project Manager will identify in writing to Supplier the apparent defects discovered by Project Manager. Supplier shall immediately take such measures as are necessary to remedy all defects as identified and any other defects known to Supplier.
6.04 Final Application for Payment
A. After Supplier has remedied all apparent defects to the satisfaction of Project Manager, furnished all Services and delivered all materials, schedules, guarantees, Bonds, certificates of inspection, and other required documents, and Project Manager has issued a notice of acceptability (subject to the provisions of Article 6), Supplier shall make application for final payment. The final Application for Payment will be accompanied by all documentation called for in the Procurement Documents, together with releases, waivers, or other documents approved by Owner.
6.05 Final Payment
A. Project Manager will, after receipt and approval of the final Application for Payment, recommend in writing final payment subject to the provisions of Article 6 and present the Application to Owner for payment. Otherwise, Project Manager will return the Application to DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 25 of 37 Supplier, indicating in writing the reasons for refusing to recommend final payment, in which case Supplier shall make the necessary corrections and resubmit the Application.
ARTICLE 7 – SUPPLIER’s Responsibilities
7.01 Supervision and Coordination
A. Supplier shall be solely responsible for the means, methods, techniques, sequences, and procedures of furnishing the Goods. Supplier shall be responsible to see that the finished Goods comply accurately and completely with the Procurement Documents.
7.02 Material, Equipment and Workmanship
A. All materials and equipment incorporated in the Goods shall be of good quality and new, except as otherwise provided in the Procurement Documents. All warranties and guarantees specifically called for by the Specifications shall expressly run to the benefit of Owner.
If required by Project Manager, Supplier shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of the materials and equipment incorporated in the Goods. All materials and equipment shall be applied, installed, connected, assembled, used, cleaned and conditioned in accordance with instructions of the applicable Supplier, except as otherwise provided in the Procurement Documents. Services shall be performed by competent and qualified personnel.
7.03 Progress Schedule
A. Supplier shall adhere to the progress schedule established in accordance with Article 2 as it may be adjusted from time to time with approval of the Project Manager.
7.04 Substitutes or Equivalent Goods
A. Whenever an item of material or equipment is specified or described in the Procurement Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent or substitution is permitted, other items of material or equipment may be accepted by Project Manager if sufficient information is submitted by Supplier to allow Project Manager to determine that the material or equipment proposed is equivalent to that named.
B. If Supplier wishes to furnish or use a substitute item of material or equipment, Supplier shall first make written application to Project Manager for acceptance thereof, certifying that the proposed substitute will perform adequately the functions and achieve the results called for by the general design, be similar in substance to that specified and be suited to the same use as that specified.
C. Supplier shall submit sufficient information to allow Project Manager to determine that the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor and include an itemized estimate of all costs or credits that will result directly or indirectly from acceptance of such substitute.
D. Project Manager 's Evaluation: Project Manager will within a reasonable time evaluate each proposal or submittal. Project Manager will be the sole judge of acceptability. No substitute will be ordered, installed, or utilized without Project Manager 's prior written acceptance DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 26 of 37 which will be evidenced by either a Change Order or an approved Shop Drawing. Owner may require SUPPLIER to furnish at SUPPLIER's expense a special performance guarantee or other surety with respect to any substitute.
E. Supplier shall reimburse Owner for the charges of Project Manager and Project Manager 's Consultants for evaluating each such proposed substitute item.
7.05 Patent Fees and Royalties
A. Supplier shall indemnify and hold harmless Owner and Project Manager and anyone directly or indirectly employed by either of them from and against all claims, costs, damages and losses (including attorneys' fees and court and arbitration costs) arising out of any infringement of patent rights or copyrights incident to the use in production of the Goods or incorporation therein of any invention, design, process, product or device not specified in the Procurement Documents.
7.06 Laws and Regulations
A. Supplier shall comply with all applicable laws and regulations (Laws and regulations) applicable to furnishing the Goods. Neither Owner nor Project Manager shall be responsible for monitoring Supplier's compliance with any Laws and Regulations.
7.07 Taxes
A. Supplier shall pay all taxes required to be paid by Supplier in accordance with Laws and Regulations affecting production and delivery of the Goods and the furnishing of Services.
7.08 Safety and Protection
A. When Supplier is furnishing Services, or remedying defective Goods at the site of installation, Supplier shall comply with all Laws and Regulations, take all necessary safety precautions and provide the necessary protection to prevent damage, injury, or loss to persons and property.
7.09 Shop Drawings and Samples
A. If required for the Project, Supplier shall submit Shop Drawings to Project Manager for review and approval in accordance with the accepted schedule of Shop Drawings and Project Requirements. The data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials and similar data to show Project Manager the materials and equipment Supplier proposes to provide and to enable Project Manager to review the information.
B. Supplier shall also submit, with such promptness as to cause no delay in timely production of the Goods, samples to Project Manager for review and approval in accordance with said accepted schedule of Shop Drawings and sample submittals. Each sample will be identified clearly as to material, Supplier, pertinent data such as catalog numbers and the use for which intended and otherwise as Project Manager may require to enable an adequate submittal review.
7.10 Submittal Procedures
A. Before submitting a Shop Drawing or sample, Supplier shall:
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 27 of 37
1. Verify quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers, and similar information with respect thereto,
2. Provide written indication that Supplier has satisfied Supplier's obligations under the Procurement Documents with respect to Supplier's review and approval of that submittal.
3. Provide Project Manager specific written notice of such variations, if any, that the Shop Drawing or sample submitted may have from the requirements of the Procurement Documents.
B. Project Manager's review and approval will be only to determine if the items covered by the submittals will, after installation, conform to the information given in the Procurement Documents and be compatible with the design concept of the completed Project as a functioning whole. Supplier shall make corrections required by Project Manager and shall return the required number of corrected copies of Shop Drawings and submit as required new samples for review and approval.
7.11 Continuing Performance
A. Supplier shall continue the furnishing of Goods and adhere to the progress schedule during all disputes or disagreements with Owner. No production of Goods will be delayed or the timely delivery of Goods or furnishing of Services be prejudiced, delayed or postponed pending resolution of any disputes or disagreements, except as Supplier and Owner may otherwise agree in writing.
ARTICLE 8 - Owner's Responsibilities
8.01 Communications, Change Orders and Site Access
A. Owner shall issue all communications to Supplier through Project Manager.
B. In connection with Owner’s rights to order changes in accordance with Article 10, Owner is obligated to execute Change Orders.
C. Owner shall provide Supplier, testing agencies and governmental agencies with jurisdictional interests, proper and safe access to the site at reasonable times as is necessary for performance of their functions in connection with the Procurement Contract.
ARTICLE 9 - Project Manager 's Status
9.01 Clarifications and Interpretations
A. Project Manager will issue with reasonable promptness such written clarifications or interpretations of the Procurement Documents (in the form of Drawings or otherwise) as may be reasonably necessary. If Supplier believes that a written clarification or interpretation justifies an adjustment in the Contract Price or Contract Time and the parties are unable to agree to the amount or extent thereof, Supplier may make a written claim therefor as provided in Article 11 or Article 12.
9.02 Authorized Variations in Work
A. Project Manager may authorize minor variations in the Work from the requirements of the Procurement Documents which do not involve an adjustment in the Contract Price or the DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 28 of 37 Contract Time.
9.03 Rejecting Defective Goods
A. Project Manager shall have authority to disapprove or reject Goods or Services which Project Manager believes to be defective and will also have authority to require special inspection or testing of Goods.
9.04 Decisions on Disputes
A. Project Manager will be the initial interpreter of the requirements of the Procurement Documents and judge of the acceptability of the Goods. Claims, disputes, and other matters relating to the acceptability of the Goods or Services or the interpretation of the requirements of the Procurement Documents shall be referred initially to Project Manager in writing with a request for a formal decision in accordance with this paragraph.
9.05 Limitations on Project Manager 's Responsibilities A. Project Manager 's authority to act under the Procurement Documents nor any decision made by Project Manager in good faith shall give rise to any duty or responsibility of Project Manager to Supplier, any subcontractor, any supplier, or any other person or organization furnishing any portion of the Goods or Services, or to any surety for any of them.
B. Project Manager shall not be responsible for Supplier's means, methods, techniques, sequences, or procedures of furnishing the Goods, or the safety precautions and programs incident thereto.
ARTICLE 10 - Changes in the Goods or Services
10.01 Additions, Deletions or Revisions
A. Without invalidating the Contract, Owner may, by written amendment or Change Order, order additions, deletions, or revisions in the Goods or furnishing of Services.
B. If Owner and Supplier are unable to agree as to an increase or decrease in the Contract Price or Contract Time as a result of additions, deletions or revisions, a claim may be made therefor as provided in Article 11 or Article 12.
C. Supplier shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any Goods or Services furnished that are not required by the Procurement Documents as amended, modified, or supplemented as provided in Article 11 and Article 12.
D. If notice of any change is required to be given to a surety, by the provisions of any Bond the giving of such notice will be Supplier's responsibility, and the amount of each applicable Bond will be adjusted accordingly.
ARTICLE 11 - Change of Contract Price
11.01 Change Order or Amendment Required
A. The Contract Price may only be changed by a Change Order or by a Written DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 29 of 37 Amendment. Any claim for an adjustment in the Contract Price shall be based on written Notice delivered by the party making the claim to the other party and to Project Manager promptly (but in no event later than thirty days) after the occurrence of the event giving rise to the claim and stating the general nature of the claim. Notice of the amount of the claim with supporting data shall be delivered within sixty days after such occurrence (unless Project Manager allows an additional period of time to ascertain more accurate data in support of the claim) and will be accompanied by claimant's written statement that the amount claimed covers all known amounts to which the claimant is entitled as a result of the occurrence of said event. All claims for adjustment in the Contract Price shall be determined by Project Manager in accordance with paragraph 9.04 if Owner and SUPPLIER cannot otherwise agree on the amount involved. No claim for an adjustment in the Contract Price will be valid if not submitted in accordance with this paragraph.
ARTICLE 12 - Change of Contract Time
12.01 Change Order or Amendment Required
A. The Contract Time may only be changed by a Change Order or a Written Amendment. Any claim for an adjustment of the Contract Time shall be based on written notice delivered by the party making the claim to the other party and to Project Manager promptly (but in no event later than thirty days) after the occurrence of the event giving rise to the claim and stating the general nature of the claim. Notice of the extent of the claim with supporting data, shall be delivered within sixty days after such occurrence (unless Project Manager allows an additional period of time to ascertain more accurate data in support of the claim) and shall be accompanied by the claimant’s written statement that the adjustment claimed is the entire adjustment to which the claimant has reason to believe it is entitled as a result of the occurrence of said event. Disputes concerning claims for adjustment in the Contract Time shall be determined in accordance with Article 9.
B. All time limits stated in the Procurement Documents are of the essence. The provisions of this Article 12 may include recovery for damages for delay by either party.
ARTICLE 13 - Tests and Inspections; Correction, Removal or Acceptance of Defective Goods
13.01 Supplier Warrants and Guarantees
A. Supplier’s obligation to furnish the Goods in accordance with the Procurement Documents is absolute, and Supplier warrants and guarantees to Owner and Project Manager that all Goods will be in accordance with the Procurement Documents and free from defects. Prompt notice of all observed defects will be given to Supplier.
B. Neither recommendation of any progress or final payment by Project Manager , nor any payment by Owner to Supplier under the Procurement Documents, nor any use of the Goods by Owner, nor any act of acceptance by Owner, nor any failure to do so, nor the issuance of a notice of acceptability by Project Manager pursuant to paragraph 6.04, nor any correction of defective Goods or Services by Owner will constitute an acceptance of Goods not in accordance with the Procurement Documents or a release of Supplier’s obligation to furnish Goods in accordance with the Procurement Documents.
C. Nothing in this Article 13 concerning the correction period shall establish a period of limitation with respect to any other obligation which Proposer has under the Procurement Documents. The establishment of time periods relates only to the specific obligations of Proposer to correct the Goods or Services and has no relationship to the time within which his obligations DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 30 of 37 under the Procurement Documents may be sought to be enforced, nor to the time within which proceedings may be commenced to establish his liability with respect to his obligations other than to specifically correct the Goods or Services.
13.02 Tests and Inspections
A. SUPPLIER shall give Project Manager timely notice of readiness of the Goods for all those inspections, tests or approvals which the Procurement Documents specify are to be observed by Project Manager or another party prior to Owner's acceptance of delivery. Owner will give SUPPLIER timely notice of all tests, inspections, and approvals of the Goods called for by the Procurement Documents which are to be conducted at the site after acceptance and prior to final payment.
13.03 Remedying Defective Goods
A. If at any time after Owner's acceptance of delivery under Article 5, and before expiration of the correction period under paragraph 13.04, Owner or Project Manager determines that the Goods are defective, Supplier shall, upon written notice from and as required by Project Manager, either correct the defects or remove the Goods and replace them with non-defective Goods. If Supplier does not do so promptly and to the satisfaction of Owner and Project Manager, Owner may, upon Project Manager ’s recommendation, accept the defective Goods instead of requiring correction or removal and replacement.
B. If Supplier fails to take action as required by Project Manager in accordance with paragraph A above, Owner may, after ten days’ written notice to Supplier, remedy any such deficiency instead of requiring removal or replacement. In an emergency where delay would cause serious risk of loss or damage, Owner may take such action without notice to or waiting for action by Supplier.
13.04 Correction Period
A. Supplier's responsibility for remedying all defects in the Goods will extend for a period of one year after the earlier of the date on which Owner has placed the Goods in continuous service or the date of final payment, or for such longer period of time as may be prescribed by law or by the terms of any applicable special guarantee required by the Procurement Documents or by any specific provisions of the Procurement Documents.
13.05 Remedying Defective Services
A. If, at any time Project Manager notifies Supplier in writing that any of the Goods are defective, Supplier shall promptly provide acceptable Goods. If Supplier fails to do so, Owner may obtain the Goods elsewhere.
13.06 Costs of Remedying Defects
A. All direct, indirect and consequential costs of correcting, removing and replacing defective Goods or of obtaining Services elsewhere and of exercising Owner's rights and remedies under Article 5 and Article 13, will be charged against Supplier in an amount verified by Project Manager ; and, if incurred prior to final payment, a Change Order will be issued incorporating the necessary revisions in the Procurement Documents and a reduction in the Contract Price, or if incurred after final payment, an appropriate amount will be paid by Supplier to Owner. Such direct, indirect, and consequential costs will include, in particular but without limitation, compensation for additional professional Services required and all costs of repair and replacement of Goods, or DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 31 of 37 property of Owner or others destroyed or damaged by correction, removal or replacement of defective Goods. Supplier will not be allowed an extension of the Contract Time because of any delay in performance attributable to the exercise by Owner of Owner's rights and remedies under this paragraph.
ARTICLE 14 - Suspension, Cancellation and Termination
14.01 Owner May Suspend
A. At any time and without cause, Owner may suspend production of the Goods or any portion thereof or the furnishing of Services for a period of not more than ninety days by notice in writing to Supplier and Project Manager. Upon fifteen days' written notice from Owner, SUPPLIER shall resume performance. Supplier will be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to any suspension if Supplier makes an approved claim therefore as provided in Articles 11 or 12.
14.02 Termination for Convenience
A. Owner may, at any time with or without cause, upon ten days' written notice to Supplier, cancel all or any part of the undelivered Goods or unfurnished Services and terminate the Procurement Contract.
14.03 Termination for Cause.
A. Owner may terminate the Procurement Contract immediately Upon the occurrence of any one or more of the following events:
1. Supplier files for bankruptcy,
2. A petition is filed against Supplier under any chapter of Bankruptcy Code;
3. Supplier makes a general assignment for the benefit of creditors;
4. Breach of the Procurement Documents;
14.04 Following termination, Owner will reimburse Supplier for all expenditures made in good faith that are unpaid at the time of termination not to exceed the maximum amount payable under the Procurement Contract unless Contractor is in default of the Procurement Contract. Goods ARTICLE 15 - Miscellaneous
15.01 Giving Notice
A. Whenever any provision of the Procurement Documents requires the giving of written notice it will be deemed when sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice.
15.02 Computation of Time
A. When any period of time is referred to in the Procurement Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day will be omitted from the computation.
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 32 of 37 B. A calendar day of twenty-four hours measured from midnight to the next midnight will constitute a day.
15.03 Professional Fees and Court Costs
A. Whenever reference is made to "claims, costs, losses and damages," it shall include in each case, but not be limited to, all fees and charges of Project Manager s, architects, attorneys and other professionals and all court or arbitration or other dispute resolution costs.
ARTICLE 16 – Dispute Resolution
16.01 Procedures
A. All claims, disputes and other matters in question between Owner, Installation Contractor and Supplier or other parties (“Parties”) arising out of, or relating to the Procurement Documents or the breach thereof shall be decided in accordance with the following procedures:
1. The Parties shall hold a meeting attended by persons with decision-making authority regarding the dispute to attempt in good faith to negotiate a resolution. The meeting shall be held promptly, but in no event later than 15 calendar days after the initial written notice of the dispute. Such meeting shall not be deemed to reduce or eliminate the obligations and liabilities of the Parties or be deemed a waiver by a Party of any remedies to which such Party would otherwise be entitled, unless otherwise agreed to by the Parties in writing.
2. If, within 15 calendar days after such meeting, the Parties have not succeeded in negotiating a resolution of the dispute, they agree to submit the dispute to non-binding mediation and to bear equally the costs of the mediation.
3. The Parties will jointly appoint a mutually acceptable mediator. If they fail to do so within 20 calendar days from the conclusion of the meeting referred to above, Owner and Supplier shall each select a mediator. The two mediators will then appoint, within ten calendar days of their selection, a third mediator who shall, as the sole mediator, conduct mediation for the Parties.
4. The Parties will schedule the mediation for a date no later than 30 calendar days after selection of the mediator(s). The Parties agree to participate in good faith in mediation, and negotiations related thereto for a period of 30 calendar days after mediation. The substantive and procedural law of the state in which the Project is located shall apply to the proceedings. If the Parties are not successful in resolving the dispute through mediation, then the Parties shall be free to litigate the matter, and agree that in the event of such litigation, the exclusive venue for such litigation shall be the state and the county in which the Project is located.
END OF DOCUMENT
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 33 of 37 DOCUMENT 01000
MATERIAL SPECIFICATIONS FOR PROCUREMENT
ARTICLE 1 – Products – Hydrodynamic Separator Storm Water Treatment Device Slide Gates PART 1 -- GENERAL
1.01 SUMMARY
A. Section Includes: Requirements for provision of slide gates including channel frame systems, gates, and operating gear systems for service in storm drainage.
1. Provide manually operated gate actuators as shown on the attached Drawings and specified herein.
1.02 REFERENCES
A. American Society for Testing and Materials (ASTM):
1. A 36 - Carbon Steel Plate.
2. A 536 - Ferritic Ductile Iron Castings.
B. American Iron and Steel Institute (AISI):
1. 303 - Stainless Steel
2. 304 - Stainless Steel
3. 316 - Stainless Steel
4. 4130 - Heat Treated Alloy Steel
5. 4140 - Heat Treated Hexagon Steel
C. American Water Works Association (AWWA).
1. C561 - Fabricated Stainless Steel Slide Gates
D. American Welding Society (AWS).
E. Research Council on Riveted and Bolted Joints (RCRBJ).
F. Steel Structures Painting Council (SSPC).
1. SSPC SP1 - Solvent Cleaning.
2. SSPC SP2 - Hand Tool Cleaning.
3. SSPC SP3 - Power Tool Cleaning.
4. SSPC SP5 - White Metal Blast Cleaning.
5. SSPC SP6 - Commercial Blast Cleaning.
6. SSPC SP7 - Brush Off Blast Cleaning.
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 34 of 37
7. SSPC SP8 - Pickling.
8. SSPC SP10 - Near White Blast Cleaning.
9. SSPC SP 11 - Power Tool Cleaning to Bare Metal.
10. SSPC-SP 12 - High- and Ultrahigh-Pressure Water Jetting.
1.03 SUBMITTALS
A. The manufacturer shall submit to the Engineer for approval, certified shop and assembly drawings and performance data. The drawings shall show the dimensions, ratings, component parts, arrangements, and materials of construction for all items covered under this section.
B. Manufacturer shall supply six (6) sets of its standard submittals which shall contain the following:
1. Performance Data Including Seating and Unseating Heads
2. Materials Lists
3. Typical Installation Guides
4. Fabrication Drawings for Mounting Frame
5. Detailed Description and Dimensions of All Accessories Including Manually Actuated Operators
6. Lubrication and Maintenance Instructions
7. Technical Manuals
8. Parts Lists
9. Printed Warranty
1.04 QUALITY ASSURANCE
A. General: Flow control gates shall be suitable for their intended use to control storm water as shown on the plans and shall be designed and fully guaranteed for this use.
B. Standards: Equipment furnished under this Section shall be in full conformity and harmony with the intent to secure the best standard of construction and equipment as a whole or in part.
Appurtenant operators supplied with flow gates furnished under this specification shall be suitable for continuous operation under submerged, partially submerged, or dry conditions. This specification shall be regarded as a minimum standard for design and fabrication of equipment.
C. Manufacturers: Each complete set of equipment supplied under this section shall be furnished by a single manufacturer who is regularly engaged in the casting or fabrication of such equipment. Appurtenant equipment such as operators and hardware, while not necessarily manufactured by the particular equipment manufacturer, shall be compatible with its product and furnished by the equipment manufacturer.
D. Submittals: Submittal data provided shall be of sufficient depth to illustrate compliance with these specifications, the plans and other specifications that may influence the proper operation of this equipment. No equipment shall be fabricated or shipped until the required drawings and curves have been submitted to and acknowledged by the Engineer as being of general compliance and conformance with the information in the contract documents.
E. Testing: Flow control gates shall be tested for performance at the factory, and after installation to demonstrate proper operation and sealing capability.
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 35 of 37 F. Operation and Maintenance Manuals: The equipment supplier shall provide operation and maintenance manuals for all equipment and accessories furnished. The manuals shall be original (no photocopies) and contain at least the following:
1. Identification stating the general nature of the manual, which appears on or is readable through the front cover.
2. Neatly typewritten index near the front of the manual, furnishing immediate information as to location in the manual of all emergency data regarding the equipment.
3. Complete and detailed instructions regarding operation and maintenance of all equipment involved.
4. Complete nomenclature of all replaceable parts, their part numbers, current cost, list of recommended spare parts to be kept on hand, and name, address and telephone number of nearest vendor of parts.
5. Copies of all guaranties and warranties issued.
6. Copies of the favorably reviewed shop drawings with all data concerning changes made during construction.
7. Where content of manuals includes manufacturers' catalog pages, clearly indicate the precise items included in this installation.
1.05 DELIVERY, STORAGE, AND HANDLING
A. Equipment shall be packaged in containers constructed for normal shipping, handling and storage.
B. The containers shall provide adequate protection for the equipment in a dry indoor environment between +40°F (+4.5°C) and +100°F (+37.8°C) until time for installation.
1.06 IDENTIFICATION
A. Each unit of equipment shall be identified with a corrosion resistant nameplate, securely affixed in a conspicuous place. Nameplate information shall include equipment model number, serial number, supplier's name, and location.
1.07 SEQUENCING AND SCHEDULING
A. Coordinate with restrictions as specified in other sections.
1.08 WARRANTY
A. Products furnished and installed under this section shall be guaranteed by the manufacturer’s warranty for a minimum period of five (5) years. Parts and labor for the first year of this guaranty period shall be provided in full, at no additional cost.
PART 2 PRODUCTS
2.01 SLIDE GATES
A. General: Gates, stems, lifts and other appurtenances shall be the size, type, material and construction as shown on the drawings and specified herein. The gate assembly shall meet or exceed the requirements of AWWA C-561 (latest revision), as modified herein. All component DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 36 of 37 parts shall be of the type of material shown, and interchangeable where size and material are the same without grinding, chipping or special fitting in the field. All mating and sliding metal parts shall be fully machined. The seating and unseating heads shall be 10 feet. All slide gate parts, including lift, shall be designed for the heads specified with a minimum safety factor of five.
B. The gate shall be the product of one manufacturer having five or more years of experience in the manufacture of similar gates for similar use. All materials used in the construction of the gates Slide Gates shall be the best suited for the application, all anchor nuts and bolts shall be stainless steel and all assembly hardware shall be of corrosion resistant material.
2.02 STYLE AND MANUFACTURER
A. Slide gates shall be the non-rising stem type.
B. Slide gates shall be Golden Harvest model GH-100, Waterman SS-251-1 or approved equal
2.03 FRAME AND GUIDE RAILS
A. The frame shall be manufactured from welded stainless steel ASTM A-276 type 316. Frames shall be the standard flange type with a rectangular opening as indicated on the plans.
B. The guide rails shall be doweled and bolted to the stainless-steel frame. The guides shall be of such length as to support the slide fully in the open position. Guides shall be of stainless steel and designed for maximum rigidity. The weldment shall contain a neoprene seat and allow for a flush seal.
C. Guide frames shall be provided with ultra-high molecular weight polyethylene seats on both sides of the slide.
D. The yoke, to support the operating bench stand where applicable, shall be formed by two structural members welded at the top of the guides to produce a one-piece rigid frame. The yoke shall be designed to allow for slide removal without removing the yoke.
E. All fasteners shall be Type 316 stainless steel.
F. All material used in the fabrication of these components shall have a minimum thickness of ¼- inch.
2.04 COVER (SLIDE)
A. Covers (slides) shall be manufactured from suitable reinforced 316L stainless steel. Slide shall not deflect more than 1/1000 or 1/16-inch at the seal points, whichever is less, of the span of the gate under maximum head.
B. All material used in the fabrication of the slide shall have a minimum thickness of ¼-inch.
2.05 SEALS
A. Gate frames shall be fitted with neoprene crown sealing faces that surround the clear opening.
P-bulb seals shall be provided to prevent excessive leakage without protruding into the specified gate opening. A stainless-steel flange shall be provided as part of the gate frame. P-seals shall be attached to the frame and held in place by a bolted retainer bar. All seals shall be easily replaced and adjusted in the field. Poured or bounded seals are not acceptable. Pressure plates shall be attached to the frame with stainless steel fasteners and easily adjustable on site. SelfDocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 37 of 37 adjusting compression cord seals, winged UHMW, flat seals, or “J”-seals will not be considered.
B. The gate frames shall be furnished with a flush bottom seal arrangement of a resilient neoprene with a minimum width of exposed face of 1 inch and shall be securely attached to the slide along the invert. All seals shall be easily replaced in the field. Poured or bounded seals are not acceptable.
2.06 STEMS AND GUIDES
A. Stems shall be manufactured from Type 316 stainless steel with rolled threads and a minimum diameter of one inch. Stems shall be of ample cross section to prevent distortion and shall be capable of withstanding twice the rated output of the manual operator at 40 pounds pull.
B. Stem guides shall be stainless steel, with ultra high weight polyethylene (UHMWPE) bushings, and mounted on stainless steel brackets. Guides shall be adjustable in two directions and shall be so constructed to they will hold the stem in alignment and still allow enough play to permit easy operation. Stem guide spacing shall be such that the L/R ratio for the unsupported part of the stem shall not exceed 200. Brackets shall be attached to the wall by anchor bolts and be of sufficient strength to prevent twisting or sagging under load.
C. The stem connection shall be either the clevis type, with structural members welded to the slide and a bolt to act as a pivot pin, or a threaded and bolted (or keyed) thrust nut supported in a welded socket. The clevis or threaded coupling shall be capable of accepting without damage at least 2 ½ times the rated output of the operator at 40-lb. pull.
D. The threaded portion of the stem shall have Acme type cold rolled threads with a maximum surface roughness of 16 micro-inches. Machine cut threads will not be permitted.
E. Stems shall be the non-rising type.
2.07 ANCHOR BOLTS
A. Anchor bolt sizes shall be as recommended by the manufacturer in type 316 stainless steel.
2.08 OPERATORS
A. Furnish operators compatible with the gates installed, comprised of hollow metal tubing connected to a manual actuator with hand wheel and a compatible stem- nut socket.
1. Specific operator length, design, mounting and orientation of hand wheel shall be coordinated with the Engineer during the submittal phase.
2. Provide specific styles of operators as shown and detailed on the Drawings.
3. Coordinate operator selection to provide requisite torque for smooth continuous multi-turn (rotary) gate operation from the closed to fully open position.
4. Operator shall be listed for continuous exposure to sewage gasses and occasional immersion.
5. Provide oil bath lubricated IP68 double seal.
B. Manual actuator with hand wheel and compatible stem-nut socket to be compatible with EM-25 Portable Electric Operator or equal. Electric Actuator to be furnished with the slide gates.
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville
FY 2022/2023 – Hydrodynamic Separator Slide Gates Page 38 of 37
2.09 SHOP TESTING
A. Each completely assembled gate and operator shall be shop-operated to insure proper assembly and operation. The gate shall be adjusted so that a 0.004" thick gauge will not be admitted at any point between the frame and cover seating surfaces.
2.10 MATERIALS
A. Frames, invert, spigot, flange, disc, yoke retainers, stems, fasteners and bolts shall be Type 316 stainless steel.
B. Seals shall be ASTM D2000 neoprene.
C. Seats shall be ASTM D4020 ultra high molecular weight polyethylene.
END OF SPECIFICATION
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3
NOTICE INVITING BIDS
PART A BID DOCUMENTS
SECTION TITLE
1 BIDDER’S CHECKLIST ............................................................................. A-1 2 BLANK - NOT USED ................................................................................. A-3 3 PROPOSAL .............................................................................................. A-4 4 BIDDER’S BOND ...................................................................................... A-9 5 NON-COLLUSION DECLARATION ............................................................ A-11 6 SUBCONTRACTORS LIST ....................................................................... A-12 7 WORKERS COMPENSATION CERTIFICATE .............................................. A-15 8 CONTRACT............................................................................................ A-16 Sample Contract
Performance Bond
Payment Bond
Guarantee
PART B GENERAL PROVISIONS
SECTION TITLE
1 GENERAL.................................................................................................. B-2 2 BIDDING .................................................................................................. B-5 3 CONTRACT AWARD AND EXECUTION ...................................................... B-10 4 SCOPE OF WORK .................................................................................... B-12 5 CONTROL OF WORK ............................................................................... B-15 6 CONTROL OF MATERIALS ........................................................................ B-25 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC ........................ B-26 8 PROSECUTION AND PROGRESS ............................................................... B-42 9 PAYMENT ............................................................................................... B-46
PART C SPECIAL PROVISIONS
PART D SUPPLEMENTAL DOCUMENTS
1 CSI FORMATTED SPECIFICATIONS ............................................................. 2 ASSIGNMENT OF PROCUREMENT CONTRACTS
3 HYDRODYNAMIC SEPERATOR RFP .............................................................. 4 STAINLESS STEEL SLIDE GATES RFP ..........................................................
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3
NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN THAT sealed bids will be received by the City of Emeryville, Alameda County, California, (hereinafter "City") at the Office of the Director of Public Works, 1333 Park Avenue, Emeryville, CA 94608, until 10 AM, SEPTEMBER 22, 2022 at which time bids will be publicly opened for the following project:
TRASH CAPTURE PROJECT
PROJECT NO. EPW 18-107
The Trash Capture Project scope of work generally includes, but is not limited to:
Demolition and off-haul of soils, pavement, debris and storm drain piping, excavation, backfill, fabric installation, site concrete; installation of precast separator and ancillary equipment, pavement replacement site restoration and other improvements or tasks as necessary to successfully install and make functional the hydrodynamic water quality in line system.
The work, to be completed within 30 working days, is more fully described in the Contract Documents, as defined in the Contract provided in Section 8, Part A, Bid Documents. The engineer’s estimate for this project is $525,000. Refer to Sample Contract (Part A) for Liquidated Damages Amounts.
Bidders and their proposed subcontractors shall hold such licenses as may be required by the laws of the State of California for the performance of the work specified in the Contract Documents. Bidders bidding as the prime Contractor shall possess a valid California State Contractor’s License, Classification A – General Engineering at the time of contract award and throughout the Contract term. The Contractor will also be required to ensure that all subcontractors working on the project are holding valid licenses suitable for their trade.
Bids shall be submitted on the forms included in Part A, Bid Documents, plainly endorsed with Bidder's name together with signed acknowledgment of any and all addenda. Bidder’s attention is directed to the Section 2, Part B, Bidding. Bid Documents shall be securely sealed in a suitable envelope marked with the name and address of the Bidder, and marked in capital letters on the front of the envelope, as follows:
TRASH CAPTURE PROJECT
PROJECT NO. EPW 18-107
Whether mailed or personally delivered, all bids shall be securely sealed in a suitable envelope and addressed to the City Engineer, City of Emeryville, Alameda County, California, 1333 Park Avenue, Emeryville, CA 94608. No late bids will be accepted and will be returned unopened.
Each bid must be accompanied by a Bid Guaranty in the form of Cash, Bidder's Bond, Certified Check or Cashier’s Check in an amount equal to at least ten percent (10%) of the Total Bid Price. The Bid Guaranty will be retained and applied to any and all damages sustained by the City in the event that the successful Bidder fails or refuses to enter into the Contract awarded to it or furnish all required bonds and certificates of insurance.
Plans, Specifications, Bid Documents, Supplemental Specifications and any Addendum may be obtained free of charge at www.ciplist.com.
The Contract awarded pursuant to this advertisement is subject to the State contract nondiscrimination and compliance requirements pursuant to California Government Code §12990.
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 The City of Emeryville hereby notifies all Bidders that it will affirmatively ensure that in any Contract awarded pursuant to this advertisement, disadvantaged business enterprises (DBEs) will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. DBEs are strongly encouraged to submit bids as both prime Contractors and subcontractors.
This is a Public Works Contract. In accordance with section 1720 et seq. of the Labor Code, the general prevailing wage rates as established by the Director of the California Department of Industrial Relations will apply. The prevailing wage rates established by the State Director of Industrial Relations can be viewed at the City’s offices, are available on the State of California’s website at http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm, or can be obtained by mail addressed to:
Prevailing Wage Unit, Division of Labor Statistics and Research, Department of Industrial Relations, P.O. Box 603, San Francisco, CA 94101.
No Contractor or subcontractor may be listed on a bid proposal or awarded a contract for a public works project unless registered with Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5 at the time of bid. Each Bidder and subcontractor must submit proof of contractor registration with DIR (e.g. a hard copy of the relevant page of the DIR's database found at: https://efiling.dir.ca.gov/PWCR/Search).
This Contract is subject to monitoring and enforcement by the DIR pursuant to Labor Code Section 1771.4.
Pursuant to Public Contract Code Section 22300, the successful Bidder may submit certain securities in lieu of the City retaining a portion of progress payments during the Project. Pursuant to California Civil Code Section 9950, the successful Bidder at the time the contract is awarded shall furnish a payment bond if civil work exceeds twenty-five thousand dollars ($25,000) in the amount of 100% of the Total Contract Price. The successful Bidder shall also provide a performance bond in the amount of 100% of the Total Contract Price.
Attention is directed to the Contract Documents for complete details and bid requirements. Said Contract Documents shall be considered as a part of any Contract awarded pursuant to this Notice Inviting Bids.
All bids are to be compared on the basis of the City Engineer's estimate of the quantities of work to be done. The City of Emeryville reserves the right to reject any or all bids, and further reserves the right to waive formal irregularities as to any bid substantially in conformity with the specifications herein referred to. The City of Piedmont reserves the right to reject any and all bids or to waive any defects or irregularity in bidding in accordance with applicable law. In accordance with California Public Contract Code Section 20103.8, if the City elects to award a contract for performance of the project, the contract will be awarded in accordance with California Public Contract Code Section 20162 and other applicable law to the responsible bidder submitting a responsive bid with the lowest total bid price. All bids will remain valid for 90 days after the bid opening. Except as permitted by law and subject to all applicable remedies, including forfeiture of bidder’s security, bidders may not withdraw their bid during the 90-day period after the bid opening.
The firm of Kimley Horn has provided engineering services to the City for this project. Therefore, this firms, and any of their affiliates, partners, officers, employees, parent companies or subsidiaries are prohibited from being awarded the Contract for the project, subcontracting for a portion of the work under the Contract for the project, or supplying materials for the work under the Contract for the project. Accordingly, these persons and entities are ineligible to bid on the project and no Contract shall be awarded to such persons or entities identified as the Contractor, subcontractor or supplier on a submitted bid proposal for this Project.
All questions prior to award of the Contract shall be directed to the Project Manager, Nancy Humphrey at [email protected] . The deadline for submissions of initial questions and clarifications concerning the Contract Documents is September 15, 2022, 2:00pm. Only signed Addenda issued by the City Engineer or Project Engineer are binding.
The City of Emeryville hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. DBEs are strongly encouraged to submit DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 bids as both primes and subs.
By order of the City Council of the City of Emeryville, Alameda County, California.
Date:
Mohamed Alaoui, PE
Public Works Director, City of Emeryville
9/1/2022
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 PART A
BID DOCUMENTS
FOR
TRASH CAPTURE PROJECT
PROJECT NO. EPW 18-107
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-1
SECTION 1
BIDDER’S CHECKLIST
All items on the Bidder’s Checklist should be checked next to each item and must be initialed and dated at the bottom for the Proposal to be considered complete. The City of Emeryville reserves the right to award a Contract in a manner and on the basis which will best serve the City.
The Bidders’ attention is specifically called to the following forms which must be executed in full as required:
1. (a) Bid Sheets □
The Base Bid Price, Add Alternate Price and Total Bid Price must be shown in the space on the Bid Proposal form provided.
(b) Bid Proposal Form □
A Bid Proposal form must be filled in, signed and submitted for the Bid Documents to be considered complete.
2. Bidder’s Bond (Accompanying Bid) □
If not otherwise providing cash, cashier’s check or certified check with its Bid Proposal as its bid guaranty, a Bidder’s Bond form must be filled out, signed, and submitted with the Bid Proposal for the Bid Documents to be considered complete. The surety’s power of attorney must be attached. Original signatures are required.
3. Non-Collusion Declaration □
A Non-Collusion Declaration form must be filled out, signed, and submitted with the Bid Proposal for the Bid Documents to be considered complete.
4. Subcontractors List □
A Subcontractors List form must be filled out and submitted with the Bid Proposal for the Bid Documents to be considered complete.
5. Workers Compensation Certificate □
The Bidder acknowledges that he/she must sign and attach any applicable Workers Compensation Certificate to the Bid Proposal.
6. Waste Management Plan □
Applicant is notified of need to prepare a Waste Management Plan as a project submittal.
On-line system is available at www.emeryville.wastetracking.com/# Check here signifies awareness of and intent to prepare, if awarded a contract.
7. Bond Requirements □
The Bidder understands that a performance bond issued by an approved surety equaling one hundred percent (100%) of the Total Contract Price amount will be required. A payment bond equaling one hundred percent (100%) of the Total Contract Price amount will also be required.
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-2
8. Addenda □
The Bidder acknowledges that he/she must sign and attach any applicable addenda to the Bid Proposal for the Bid Documents to be considered complete.
Initial: ______________________ Date: ______________
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-3
SECTION 2
Not Used
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-4
SECTION 3
PROPOSAL
To the Honorable City Council of the City of Emeryville, Alameda County, California.
TRASH CAPTURE PROJECT
PROJECT NO. EPW 18-107
Name of Bidder
Street Address
City, State, Zip Code
Telephone No.
Email Address
FOR USE WITH THE FOLLOWING:
1. The State of California Department of Transportation Standard Specifications, 2018, and the State of California Department of Transportation Standard Plans, 2018.
The Contract Drawings are generally titled TRASH CAPTURE PROJECT, Project No. EPW 18-107.
Bids are to be submitted for the entire work. The amount of the bid for comparison purposes will be the total of all items.
The Bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for that purpose. In the case of unit basis items, the amount set forth under the "Item Total" column shall be the product of the unit price bid and the estimated quantity for the item.
In case of discrepancy between item price and the total set forth for the item, the item price shall prevail, provided, however, if the amount set forth as an item price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or in the case of unit basis items, is the same amount as the entry in the "Item Total" column, then the amount set forth in the "Item Total" column for the item shall prevail in accordance with the following:
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-5
PROPOSAL (CONT.) Project No. EPW 18-107
(1) As to lump sum items, the amount set forth in the "Item Total" column shall be the item price. (2) As the unit basis items, the amount set forth in the "Item Total" column shall be divided by the estimated quantity for the item and the price thus obtained shall be the item price.
If this proposal shall be accepted and the undersigned shall fail to enter into the Contract and furnish the two (2) bonds in the sums to be determined as aforesaid with surety satisfactory to the Department of Public Works and provide the appropriate insurance certificates within ten (10) calendar days after the Bidder has received notice from the City Engineer that the Contract has been awarded, the City may, at its option, determine that the Bidder has abandoned the Contract, and thereupon this proposal and the acceptance thereof shall be null and void and the forfeiture of such security accompanying this proposal shall operate and the same shall be the property of the City of Emeryville. If the deadline to perform any act shall fall on a Saturday, Sunday or legal holiday of the City, then the deadline to perform said act shall fall on the next regular business day.
The undersigned, as Bidder, declares that the only persons or parties interested in this proposal as principals are those named herein; that this proposal is made without collusion with any other person, firms, or corporation and in submitting this proposal, the undersigned Bidder agrees that he has carefully examined the location of the proposed work, the annexed proposed form of Contract, and the plans and specifications therein referred to; and he proposes, and agrees if this proposal is accepted, that he will contract with the City of Emeryville in the form of a copy of the Contract annexed hereto to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the Contract, in the manner and time therein prescribed, and according to the requirements of the City Engineer as therein set forth, and that he will take in full payment therefore the following item prices to wit:
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-6
BID SHEET FOR THE TRASH CAPTURE PROJECT City of Emeryville City Project No. EPW 18-107 Department of Public Works
Units of Measure Abbreviations are defined in Section One of the Standard Specifications Item
No.
Description Unit Estimated
Quantity
Unit Price Item Total
1 SUPPLEMENTAL WORK EA 20000 $1.00 $20,000
2 MOBILIZATION LS 1
3 TRAFFIC CONTROL SYSTEM LS 1
4 WATER POLLUTION CONTROL PLAN AND
IMPLEMENTATION
LS 1
5 SHEETING SHORING AND BRACING PLAN AND
IMPLEMENTATION
LS 1
6 EXCAVATION DEWATERING, STORMWATER FLOW
CONTROL PLAN AND IMPLEMENTATION
LS 1
7 CLEARING, GRUBBING, DEMOLITION AND
PROTECTION OF EXISTING IMPROVEMENTS
LS 1
8 EXCAVATION, HAULING, AND CLASS II SOIL DISPOSAL TON 500 9 ASSUMPTION OF PROCUREMENT CONTRACT FOR
SEPARATOR
LS 1
10 ASSUMPTION OF PROCUREMENT CONTRACT FOR
SLIDE GATES
LS 1
11 INSTALL SEPARATOR WITH SLIDE GATES AND HATCH
INCLUDING GROUNDWATER HANDLING AND BACKFILL
LS 1
12 MINOR CONCRETE (14’x25’ maintenance pad) SF 350
13 CONCRETE CURB AND GUTTER LS 1
14 SITE RESTORATION LS 1
TOTAL BID PRICE
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-7
PROPOSAL (CONT.) Project No. EPW 18-107
Accompanying this proposal is
(Notice: insert the words CASH ($), CASHIER'S CHECK, CERTIFIED CHECK, OR BIDDERS BOND) in an amount equal to at least ten percent of the total of the Total Bid Price.
The names of all persons interested in the foregoing proposal as principals are as follows:
IMPORTANT NOTICE: If Bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer, and manager thereof; if a co-partnership, state true name of firm, also names of all individual copartners composing firm; if Bidder or other interested person is an individual, state first and last names in full.
Licensed in accordance with an act providing for the registration of Contractors:
Contractor: License No.
Licensee Name
License Qualifier
Date Issued
Other License Classifications Hazardous Substances Removal: License No
Licensee Name (May be Subcontractor)
License Qualifier
Date Issued
DIR Registration Number
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-8
PROPOSAL (CONT.) Project No. EPW 18-107
ADDENDA This Proposal is submitted with respect to the changes to the contract included in addenda numbers ____________ (Fill in any addenda numbers if addenda have been received.)
By my signature on this proposal, I certify, under penalty of perjury, under the laws of the State of California, that the foregoing questionnaire and statements of Public Contract Code Section 10162, 10232 and 10285.1 are true and correct and that the Bidder has complied with the requirements of Section 8103 of the Fair Employment and Housing Commission Regulations (Chapter 5, Title 2 of the California Administrative Code). By my signature on this proposal, I further certify, under penalty of perjury, under the laws of the State of California, that the Non-Collusion Affidavit required by Public Contract Code Section 7106 is true and correct.
SIGN HERE >>> by:
its:
Date:
END OF PROPOSAL
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-9
SECTION 4
BIDDER'S BOND
KNOW ALL PERSONS BY THESE PRESENTS:
That , as Principal, and , as Surety, are
held and firmly bound unto the City of Emeryville, a municipal corporation located in Alameda County, State of California (hereinafter "City"), in the sum of ($) , being at least ten percent (10%) of the total amount of the Grand Total Bid Price, for the payment of which sum in lawful money of the United States of America to the City of Emeryville we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted said bid to the City for the TRASH CAPTURE PROJECT, Project No. EPW 18-107 ("Project");
NOW, THEREFORE, the condition of the above obligation is such that if a Contract is awarded by the City within the time and in the manner required by the specifications for the Project, and a written Contract is entered into with the City and the requisite bond or bonds and insurance certificates are furnished, then this obligation shall become null and void, otherwise to remain in full force and effect for ninety (90) days following the public opening of bids for this solicitation.
In the event suit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all costs incurred by the City in such suit, including a reasonable attorneys fee to be fixed by the Court.
Dated , 2022.
TO BE CONSIDERED COMPLETE,
BOTH THE PRINCIPAL AND Principal
SURETY MUST SIGN THIS
BIDDER'S BOND. IN ADDITION, By:
THE SURETY'S SIGNATURE MUST
BE NOTARIZED AND
THE SURETY'S POWER OF ATTORNEY Surety
MUST BE ATTACHED. ORIGINAL
SIGNATURES ARE REQUIRED By:
Address of Surety
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-10
CERTIFICATE OF ACKNOWLEDGMENT
STATE OF CALIFORNIA
ss
COUNTY OF ALAMEDA
On , 2022 before me,____________________________________, Notary Public, personally appeared ___________________________________ , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Signature: (Seal Above)
END OF BIDDERS BOND
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-11
SECTION 5
NON-COLLUSION DECLARATION
The undersigned declares:
I am the of , the party making
the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
The undersigned declares under penalty of perjury that the information contained in this proposal and all accompanying documents are true and correct.
Executed on
Legal Company Name
By:
Title:
Date:
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-12
SECTION 6
SUBCONTRACTORS LIST
In accordance with Section 2-1.10 “Subcontractors List" of the Standard Specifications for this Contract, the following list of Subcontractors is submitted with the Proposal and made a part thereof.
1. Name of Subcontractor/Supplier
License No.
Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.
Percentage of Item No. to be Performed
Dollar Value of Work
2. Name of Subcontractor/Supplier
License No.
Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.
Percentage of Item No. to be Performed
Dollar Value of Work
3. Name of Subcontractor/Supplier
License No.
Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.
Percentage of Item No. to be Performed
Dollar Value of Work
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-13
4. Name of Subcontractor/Supplier
License No.
Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.
Percentage of Item No. to be Performed
Dollar Value of Work 5. Name of Subcontractor/Supplier
License No.
Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.
Percentage of Item No. to be Performed
Dollar Value of Work 6. Name of Subcontractor/Supplier
License No.
Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Dollar Value of Work \
7. Name of Subcontractor/Supplier
License No.
Dept. of Industrial Relations Registration No. ________________________________ Address
Work to be Performed
Bid Sheet Item No.
Percentage of Item No. to be Performed
Dollar Value of Work
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-14
SECTION 7
WORKERS’ COMPENSATION CERTIFICATE
To be executed by Bidder and submitted with bid
By signing below, Bidder is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake selfinsurance in accordance with the provision of that code, and if awarded a Contract, Bidder will comply with such provisions before commencing the performance of the work of this Contract.
Firm Name _
Signature of Authorized Official
Printed Name of Authorized Official
Title of Authorized Official _
Date
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3
CITY OF OAKLAND CITY OF EMERYVILLE
W. MACARTHUR BLVD
PERALTA ST
ADELINE ST
EMERY ST SAN PABLO AVE
580
580
580
80 MANDELA PKWY
HOLLIS ST
40th ST
MARKET ST
PROJECT LOCATION
LEGEND
STREET LIGHT
MANHOLE
CATCH BASIN
UTILITY BOX (SIZE VARIES)
CURB
PROPERTY LINE
CURB & GUTTER
FENCE
SINGLE TREE
TREES AND BRUSH
SANITARY SEWER
STORM DRAIN
WATER
GAS
TITLE SHEET
1 FILE NAME:1 TITLE SHEET.dwg
SS
SD SD
W W
G G
XX
10 UNDERGROUND
SERVICE ALERT
NORTH 811
CALL: TOLL FREE
1-800-227-2600
TWO WORKING DAYS BEFORE YOU DIG
MARK REVISIONS APPR. DATE.
SURVEY
PG&E
EBMUD
CALTRANS
APPROVED BY BY DATE APPROVED BY
CITY ENGINEER
DATE: HORIZ. SCALE VERT. SCALE
CITY OF EMERYVILLE, CALIFORNIA
DEPARTMENT OF PUBLIC WORKS
TRASH CAPTURE DESIGN PROJECT
DESIGN WORK ORDER. NO.: XXXXX
CONSTR. WORK ORDER. NO.: XXXXX
SHEET OF
Schaaf Wheeler
CONSULTING CIVIL ENGINEERS
4699 OLD IRONSIDES DR., SUITE #350
SANTA CLARA, CA 95054
(408) 246-4848
DATE: 9/1/2022
DESIGNED BY: FTS DRAWN BY: FM CHECKED BY: CJT
ABBREVIATIONS
ACPWA ALAMEDA COUNTY PUBLIC
WORKS AGENCY
(E) EXISTING
EG EXISTING GROUND
(MT) MULTI-TRUNK TREE
AB AGGREGATE BASE
AC ASPHALTIC CONCRETE
BS BOTTOM OF STEP
BW BACK OF WALK
CL CENTERLINE
CMP CORRUGATED METAL PIPE
COMMS COMMUNICATIONS
CONC CONCRETE
CP CONTROL POINT
DET DETAIL
DI DRAIN INLET
EL ELEVATION
ESMT EASEMENT
EW EDGE OF WALK
EXC EXCAVATION
FG FINISHED GROUND
FL FLOWLINE
HDS HYDRODYNAMIC
SEPARATOR
HGL HYDRAULIC GRADE LINE
HOR HORIZONTAL
INV. IN INVERT IN ELEVATION
INV. OUT INVERT OUT ELEVATION
IRR IRRIGATION
L/S LANDSCAPE
LIP LIP OF GUTTER
MFG MANUFACTURER
MH MANHOLE
MIN MINIMUM
O.C. ON CENTER
O.A. OUTSIDE DIAMETER
OH OVERHEAD
O.R. ORIGINAL RECORD
PCC PORTLAND CEMENT
CONCRETE
PL PROPERTY LINE
PSE PUBLICE SERVICE
EASEMENT
PV PAVEMENT
PVAW PRIVATE VEHICLE ACCESS
WAY
PVC POLYVINYL CHLORIDE
R RADIUS
RC RELATIVE COMPACTION
SD STORM DRAIN
SDE STORM DRAIN EASEMENT
SDMH STORM DRAIN MANHOLE
SPEC SPECIFICATION
SS SANITARY SEWER
STA STATION
TCD THRU CURB DRAIN
TOC TOP OF CURB
TPZ TREE PROTECTION ZONE
TS TOP OF SLAB
TW TOP OF WALL
TYP TYPICAL
UB UTILITY BOX
VER VERTICAL
W/ WIDTH
CITY OF EMERYVILLE
ALAMEDA COUNTY, CALIFORNIA
PLANS FOR THE CONSTRUCTION OF TRASH CAPTURE DEVICE
AT MACARTHUR BOULEVARD
PROJECT NO. EPW 107-18
SHEET LIST TABLE
SHEET NUMBER SHEET TITLE
1 TITLE SHEET
2 GENERAL NOTES
3 BLUEPRINT FOR CLEAN BAY
4 EXISTING SITE AND CONTROL PLAN
5 DEMOLITION PLAN
6 IMPROVEMENTS PLAN
7 DETAILS
8 DETAILS
9 DETAILS
10 SLIDE GATE DETAILS
CITY ENGINEER'S STATEMENT
IN ACCORDANCE WITH SECTION 7-7.01(c) OF CHAPTER 7 OF TITLE 7 OF THE EMERYVILLE MUNICIPAL
CODE, AS CITY ENGINEER FOR THE CITY OF EMERYVILLE, I DO HEREBY EXERCISE THE DISCRETION
DELEGATED TO ME AND APPROVE THE PLAN OR DESIGN OF A CONSTRUCTION OF, OR AN IMPROVEMENT TO, PUBLIC PROPERTY TO WHICH THIS STATEMENT AND MY SIGNATURE IS AFFIXED.
MOHAMED ALAOUI DATE
CITY ENGINEER
CE #68556
September 1, 2022
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3
GENERAL
1. ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) 2018 STANDARD PLANS, REVISED
STANDARD PLANS AND OTHER STANDARDS USED WHERE NOTED, OR WHEN NOT
COVERED BY CALTRANS STANDARDS, INCLUDE CITY OF EMERYVILLE STANDARD
DETAILS, STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION (SPPWC) LATEST
EDITION AND SUPPLEMENTS, AND CALIFORNIA BUILDING CODE (EXCAVATION AND GRADING), WITH THE MOST STRINGENT GOVERNING.
2. UTILITIES HAVE BEEN LOCATED TO THE BEST OF THE ENGINEER'S ABILITY AND FROM DATA AND RECORDS FURNISHED BY THE REPRESENTATIVES OF THE VARIOUS UTILITIES.
IT IS THE SOLE DUTY AND RESPONSIBILITY OF THE CONTRACTOR TO ASCERTAIN THE
TRUE LOCATION AND IDENTIFY ANY/ALL UNDERGROUND UTILITIES AND VERIFY ALL CONDITIONS ON THE JOB SITE. CONTRACTOR MUST POTHOLE TO VERIFY THE LOCATION
OF EACH AND COORDINATE WITH RESPECTIVE OWNERS FOR RELOCATION IF NECESSARY. HAND DIG EXCAVATIONS UNTIL CLEAR OF OBSTRUCTIONS.
3. CONTRACTOR WILL MAKE EXPLORATION EXCAVATIONS AND LOCATE EXISTING
UNDERGROUND FACILITIES SUFFICIENTLY AHEAD OF CONSTRUCTION PERMIT
REVISIONS TO PLANS IF REVISIONS ARE NECESSARY BECAUSE OF ACTUAL LOCATION OF EXISTING FACILITIES.
4. CONTRACTOR IS RESPONSIBLE FOR DAMAGE TO ANY PUBLIC OR PRIVATE UTILITIES AND/OR STRUCTURES SHOWN OR NOT SHOWN ON THESE PLANS. THE CONTRACTOR IS
REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES OR STRUCTURES FOUND AT THE SITE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURES BEFORE STARTING WORK (TWO (2) WORKING DAYS NOTICE REQUIRED).
5. CONTRACTOR MUST COMPLY WITH ALL APPLICABLE DIVISION OF INDUSTRIAL RELATIONS (CAL/OSHA OR DOSH) SAFETY STANDARDS. CONTRACTOR MUST PROVIDE PROOF OF A PERMIT FROM CAL/OSHA IF REQUESTED BY THE INSPECTOR.
6. CONTRACTOR MUST NOTIFY UNDERGROUND SERVICE ALERT (USA) AT (800) 642-2444 AT LEAST TWO (2) WORKING DAYS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION TO
ALLOW UTILITY OWNERS TO MARK THE LOCATION OF THEIR RESPECTIVE
UNDERGROUND FACILITIES/UTILITIES, PUBLIC OR PRIVATE, SHOWN OR NOT SHOWN ON THESE PLANS.
7. THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE APPROVED BY THE ENGINEER.
8. WORK IN PUBLIC STREETS MUST BE PROSECUTED TO COMPLETION WITHOUT DELAY SO
AS TO PROVIDE MINIMUM INCONVENIENCE TO ADJACENT PROPERTY OWNERS AND TO THE TRAVELING PUBLIC.
9. CONTRACTOR MUST PROTECT ADJACENT PROPERTIES FROM ALL DAMAGE THAT MAY
OCCUR FROM STORM WATER RUNOFF AND/OR DEPOSITION OF DEBRIS RESULTING FROM ANY AND ALL WORK IN CONNECTION WITH CONSTRUCTION.
10. CONTRACTOR MUST FIELD VERIFY ALL CONTROLLING DIMENSIONS PRIOR TO ORDERING MATERIALS AND COMMENCING WORK.
11. THE CONTRACTOR MUST DESIGN, CONSTRUCT, AND MAINTAIN ALL SAFETY DEVICES,
INCLUDING SHORING, AND IS SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE, AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS, AND REGULATIONS.
12. TRENCH BACKFILL AND RESTORATION SHALL BE PERFORMED IN ACCORDANCE WITH THE CITY OF EMERYVILLE STANDARD PLANS AND DETAILS.
13. CONTRACTOR MUST KEEP THE WORK SITE CLEAN AND FREE FROM RUBBISH AND
DEBRIS DURING CONSTRUCTION, INCLUDING SUSPENSION OF WORK, UNTIL FINAL ACCEPTANCE OF THE PROJECT.
14. CONTRACTOR MUST ABATE DUST NUISANCE BY CLEANING, SWEEPING, AND SPRINKLING
WITH WATER AND USING DUST FENCES OR OTHER METHODS IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS AND AS DIRECTED BY THE CITY ENGINEER THROUGHOUT THE CONSTRUCTION OPERATION.
15. ALL DAMAGE CAUSED TO PUBLIC STREETS, INCLUDING HAUL ROUTES, ALLEYS,
SIDEWALKS, CURBS, STREET FURNISHINGS, OR TO PRIVATE PROPERTY MUST BE
REPAIRED AT THE SOLE EXPENSE OF THE CONTRACTOR TO THE ENGINEERS SATISFACTION.
16. SAWCUTTING OF EXISTING PAVEMENT SHALL BE TO A CLEAN STRAIGHT EDGE AND IS SUBJET TO THE REVIEW AND APPROVAL OF THE CITY REPRESENTATIVE.
CONTROL OF WORK
17. CONSTRUCTION SAFETY ORDERS FOR EXCAVATIONS: THE CONTRACTOR SHALL
CONFORM TO THE RULES AND REGULATIONS OF THE CONSTRUCTION SAFETY ORDERS
OF THE STATE DIVISION OF OCCUPATIONAL SAFETY AND HEALTH PERTAINING TO EXCAVATION AND TRENCHES.
18. NORMAL WORKING HOURS: NORMAL WORKING HOURS IS DEFINED AS THE TIME FROM 7:30 A.M. TO 4:00 P.M., MONDAY THROUGH FRIDAY, EXCLUDING LEGAL HOLIDAYS. THE
CONTRACTOR SHALL NOT WORK ON THE PROJECT OUTSIDE THE NORMAL WORKING
HOURS, UNLESS PRIOR APPROVAL IS OBTAINED FROM THE CITY OR WHEN SPECIFICALLY REQUIRED BY THE CITY. WORK OUTSIDE NORMAL WORKING HOURS WILL ONLY BE ALLOWED IF A CITY INSPECTOR IS AVAILABLE. THE CONTRACTOR SHALL PAY
THE CITY FOR THE COST OF OVERTIME FOR CITY INSPECTION PERFORMED OUTSIDE OF NORMAL WORKING HOURS.
19. COORDINATION WITH OTHER AGENCIES AND PRIVATE PROPERTY OWNERS: THE
CONTRACTOR SHALL BE RESPONSIBLE COORDINATING INSPECTION PERFORMED BY
OTHER GOVERNMENTAL AGENCIES, AS PRESCRIBED IN THEIR PERMITS AND APPROVALS.
20. AIRBORNE DUST: AT ALL TIMES DURING CONSTRUCTION AND UNTIL FINAL COMPLETION
AND ACCEPTANCE OF THE WORK, THE CONTRACTOR SHALL PREVENT THE FORMATION
OF AN AIRBORNE DUST NUISANCE IN SUCH A MANNER THAT IT WILL CONTAIN DUST PARTICLES TO THE IMMEDIATE SURFACE OF THE WORK . THE CONTRACTOR SHALL PERFORM SUCH TREATMENT WITHIN 2 HOURS AFTER NOTIFICATION BY THE CITY THAT AN AIRBORNE NUISANCE EXISTS.
21. MAINTENANCE OF EQUIPMENT: ALL EQUIPMENT SHALL BE MAINTAINED IN GOOD ORDER.
SUBSTANDARD OR UNSUITABLE PAVING EQUIPMENT WILL NOT BE ALLOWED.
22. FINAL INSPECTION: THE CITY WILL NOT PERFORM THE FINAL INSPECTION UNTIL THE CONTRACTOR COMPLETES ALL WORK AND FINAL CLEANUP OF THE SITE.
23. MAINTENANCE OF WORK SITE: THE CONTRACTOR SHALL KEEP THE STREET, PARKING LOT, AND WORK SITE CLEAN AND FREE FROM RUBBISH AND DEBRIS PER SECTION 5-15 OF THE STANDARD PROVISIONS. THIS PROVISION REQUIRES PREVENTING SPILLAGE ON
HAUL ROUTES, CLEANING UP SPILLAGE, SWEEPING ALL STREETS AND PARKING LOTS OF
MUD, DIRT AND DEBRIS THAT ARE A RESULT OF THE CONTRACTOR'S WORK, AND KEEPING THE WORK SITE IN A CLEAN AND NEAT APPEARANCE. ANY SPILLAGE ON HAUL ROUTES SHALL BE IMMEDIATELY REMOVED AND CLEANED UP.
24. CLEANING SITE UPON NOTICE FROM CITY: WHEN ORDERED BY THE CITY, THE CONTRACTOR SHALL CLEAN UP THE WORK SITE WITHIN 24 HOURS AFTER RECEIVING NOTICE.
LEGAL RELATIONS AND RESPONSIBILITY
25. STATE AND CITY LICENSES: ALL CONTRACTORS AND SUBCONTRACTORS SHALL BE
LICENSED IN ACCORDANCE WITH THE LAWS OF THE STATE OF CALIFORNIA AND SHALL HAVE AND MAINTAIN A VALID CITY BUSINESS LICENSE.
26. COMPLIANCE WITH ENVIRONMENTAL DOCUMENTS: THE CONTRACTOR SHALL COMPLY
WITH THE PROVISIONS OF ALL PERMITS, LICENSES OR OTHER AUTHORIZATIONS APPLICABLE TO THE WORK WITH RESPECT TO THE ENVIRONMENTAL QUALITY ACT.
27. MAINTAIN TRAFFIC CONTROL DEVICES: THE CONTRACTOR SHALL INSTALL AND MAINTAIN
FENCES, BARRIERS, LIGHTS AND SIGNS THAT ARE NECESSARY TO GIVE ADEQUATE
WARNING TO THE PUBLIC AT ALL TIMES IN ACCORDANCE WITH THE CALIFORNIA MANUAL
ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD) OF TRANSPORTATION'S TRAFFIC CONTROL MANUAL.
28. REMOVE MATERIAL AND EQUIPMENT AT END OF DAY: NO MATERIAL OR EQUIPMENT SHALL BE STORED WITHIN WORK AREA AFTER "NORMAL WORKING HOURS".
29. HAZARDOUS MATERIALS AND WASTE: ALL WORK SHALL BE CONDUCTED IN A MANNER
WHICH PREVENTS THE RELEASE OF HAZARDOUS MATERIALS OR HAZARDOUS WASTE TO
THE SOIL OR GROUNDWATER, AND MINIMIZES THE DISCHARGE OF HAZARDOUS
MATERIALS, HAZARDOUS WASTES, POLLUTED WATER AND SEDIMENTS TO THE STORM DRAIN SYSTEM.
30. COORDINATION WITH OTHER CONTRACTORS: WHERE TWO OR MORE CONTRACTORS
ARE WORKING IN THE SAME AREA, EACH SHALL CONDUCT THEIR OPERATIONS IN SUCH
A MANNER AS NOT TO CAUSE ANY UNNECESSARY DELAY OR HINDRANCE TO THE OTHER. WHERE CONFLICTS CANNOT BE AVOIDED, THE CITY WILL DETERMINE WHICH
CONTRACTORS HAVE CONSTRUCTION PRIORITY OVER THE OTHER CONTRACTORS AND THE TERMS OF SUCH CONSTRUCTION PRIORITY.
NOTIFICATION
31. DANGEROUS SITUATIONS, CALL 911: IF ANY DAMAGE OCCURS TO AN UNDERGROUND
FACILITY THAT RESULTS IN THE ESCAPE OF ANY FLAMMABLE, TOXIC OR CORROSIVE
GAS OR LIQUID OR ENDANGERS LIFE, HEALTH, OR PROPERTY, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE UTILITY OWNER AND CALL THE 911 EMERGENCY TELEPHONE NUMBER TO NOTIFY LOCAL PUBLIC SAFETY OFFICIALS.
32. PROVIDE SUPERINTENDENT INFORMATION BEFORE START OF WORK: THE CONTRACTOR
SHALL PROVIDE THE NAME AND TELEPHONE NUMBER OF THE AUTHORIZED
REPRESENTATIVE (SUPERINTENDENT) OF THE WORK TO THE CITY IN WRITING PRIOR TO THE START OF WORK.
33. CONTACT USA: CONTRACTOR SHALL CONTACT USA (UNDERGROUND SERVICE ALERT) AT (800) 642-2444 AT LEAST TWO WORKING DAYS BUT NOT MORE THAN 14 DAYS PRIOR TO COMMENCING EXCAVATION WORK TO VERIFY EXISTING UNDERGROUND UTILITIES.
34. NOTIFY UTILITY OWNERS: CONTRACTOR SHALL NOTIFY ALL PUBLIC OR PRIVATE UTILITY
OWNERS FORTY-EIGHT HOURS PRIOR TO COMMENCEMENT OF WORK ADJACENT TO THE UTILITY.
EXCAVATIONS
35. UTILITY INSPECTION REQUIREMENT: ALL CITY APPURTENANCES MUST BE INSPECTED BY THE CITY PRIOR TO BACKFILLING ANY TRENCHES OR POURING ANY CONCRETE.
36. EXCAVATIONS: AT THE END OF THE EACH WORK DAY, ALL EXCAVATIONS WITHIN THE STREET AND TRAVEL WAY SHALL BE: (1) BACKFILLED AND PAVED WITH TEMPORARY
PAVING SUCH THAT THE FINISHED SURFACE IS FLUSH WITH THE EXISTING PAVEMENT, (2) ADEQUATELY COVERED WITH STEEL PLATE BRIDGING, OR (3) BACKFILLED AND PAVED WITH PERMANENT PAVING. IF STEEL PLATE BRIDGING IS USED, THE STEEL PLATE BRIDGING MUST BE REMOVED WITHIN 48 HOURS AFTER ITS INSTALLATION. CONTROL DENSITY FILL SHALL NOT BE USE AS TEMPORARY AC PAVING.
37. AC PAVING MACHINE: FOR EXCAVATIONS WITHIN PAVED AREAS THAT ARE MORE THAN 8 FEET WIDE, THE AC SURFACING SHALL BE INSTALLED WITH AN AC PAVING MACHINE.
38. PAVEMENT STRIPING DAMAGE: PAVEMENT STRIPING DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS SHALL BE REPLACED IN KIND BY THE CONTRACTOR.
39. CONTROL DENSITY FILL: CONTROLLED DENSITY FILL MAY BE USED AS SUBSEQUENT BACKFILL MATERIAL ONLY WHEN SPECIFICALLY APPROVED BY THE CITY. CONTROLLED
DENSITY FILL SHALL NOT BE USED AS PIPE BEDDING MATERIAL, UNLESS AN EXCEPTION IS GRANTED BY THE CITY.
40. OPEN TRENCH SAFETY PLAN: CONTRACTOR SHALL SUBMIT SAFETY PLAN FOR WORKING AROUND OPEN TRENCH. OPEN TRENCH SHALL BE FENCED OFF AND LOCKED AT END OF WORKING DAY AND SHALL HAVE SIGNS THAT READ, "DANGER OPEN TRENCH". K-RAIL
SHALL BE PLACED INSIDE OF FENCE-LINE TO PREVENT ACCIDENTAL INJURY FROM A CAR COLLISION THRU THE FENCING.
LANDSCAPING
41. SITE IRRIGATION: THE CONTRACTOR SHALL MAINTAIN IRRIGATION TO ADJACENT LANDSCAPING DURING CONSTRUCTION.
WATER FOR CONSTRUCTION
42. CONTRACTOR SHALL COORDINATE TEMPORARY WATER SERVICE WITH EAST BAY MUNICIPAL UTILITY DISTRICT TO OBTAIN REQUIRED WATER FOR CONSTRUCTION.
SITE RESTORATION
43. MINIMIZE DAMAGE TO LANDSCAPE: EXISTING LANDSCAPE WITHIN THE AREA OF WORK SHALL BE CAREFULLY REMOVED AND REPLACED WITH MINIMAL DAMAGE.
44. SITE RESTORATION: THE CONTRACTOR SHALL RETURN PRIVATE YARDS, SIDEWALKS,
PLANTERS, IRRIGATION SYSTEMS, AND ANY OTHER FACILITIES, PUBLIC OR PRIVATE,
DISTURBED BY THE WORK TO THE SAME OR BETTER CONDITION THAT EXISTED PRIOR TO COMMENCEMENT OF THE WORK.
PROJECT SPECIFIC NOTES
45. UTILITY LOCATION: IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL UTILITIES
PRIOR TO START OF CONSTRUCTION WITH THE APPROPRIATE AGENCIES OR BY POTHOLING.
UTILITIES AND SERVICES SHALL BE PROTECTED DURING CONSTRUCTION. IF REQUIRED
BY CONSTRUCTION ACTIVITIES, UTILITIES SHALL BE RELOCATED BY THE CONTRACTOR IN ACCORDANCE WITH THE REQUIREMENTS OF THE UTILITY COMPANIES. UTILITIES
DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE CITY AND UTILITY COMPANY.
46. SHORING AND EXCAVATION PROTECTION: CONTRACTOR TO ASSUME FULL AND
COMPLETE RESPONSIBILITY FOR EXCAVATION SUPPORT AND PROTECTION, INCLUDING SHORING DESIGN AND INSTALLATION PER TECHNICAL SPECIFICATION SECTION 15 -
EXCAVATION SUPPORT & PROTECTION
47. STORMWATER CONTROL: THE CITY'S EXISTING 27" STEEL STORM DRAIN SERVES AS AN OUTLET FOR AN 81 ACRE DRAINAGE AREA. CONTRACTOR SHALL EXPECT CONTINUOUS INFLOW THROUGH THE PIPE. PIPE INFLOW SHALL BE ANTICIPATED EVEN DURING THE DRY SEASON AND PERIODS OF NO RAIN. THE CONTRACTOR SHALL DESIGN A
DEWATERING AND STORMWATER CONTROL SYSTEM TO BYPASS FLOW FROM THE STORM DRAINAGE SYSTEM TO DISCHARGE DOWNSTREAM. CONTRACTOR IS REQUIRED
TO HANDLE ALL STORMWATER, AND GROUNDWATER PER SPECIFICATION SECTION 31-23-19 DEWATERING AND STORMWATER MANAGEMENT
48. AC PAVEMENT DAMAGE: CONTRACTOR SHALL PROTECT EXISTING AC PAVEMENT FROM
DAMAGE BY THE CONSTRUCTION VEHICLES CONTRACTOR SHALL USE RUBBER TIRED VEHICLES OR PLACE STEEL PLATES TO PREVENT DAMAGE TO EXISTING PAVEMENT. ALL DAMAGED PAVEMENT SHALL BE REPLACED IN KIND WITH FOG SEAL.
FILE NAME:2 GENERAL NOTES.dwg
10 UNDERGROUND
SERVICE ALERT
NORTH 811
CALL: TOLL FREE
1-800-227-2600
TWO WORKING DAYS BEFORE YOU DIG
MARK REVISIONS APPR. DATE.
SURVEY
PG&E
EBMUD
CALTRANS
APPROVED BY BY DATE APPROVED BY
CITY ENGINEER
DATE: HORIZ. SCALE VERT. SCALE
CITY OF EMERYVILLE, CALIFORNIA
DEPARTMENT OF PUBLIC WORKS
TRASH CAPTURE DESIGN PROJECT
DESIGN WORK ORDER. NO.: XXXXX
CONSTR. WORK ORDER. NO.: XXXXX
SHEET OF
Schaaf Wheeler
CONSULTING CIVIL ENGINEERS
4699 OLD IRONSIDES DR., SUITE #350
SANTA CLARA, CA 95054
(408) 246-4848
DATE: 9/1/2022
DESIGNED BY: FTS DRAWN BY: FM CHECKED BY: CJT
GENERAL NOTES
2 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 FILE NAME:3 BLUEPRINT FOR CLEAN
BAY.dwg
10 UNDERGROUND
SERVICE ALERT
NORTH 811
CALL: TOLL FREE
1-800-227-2600
TWO WORKING DAYS BEFORE YOU DIG
MARK REVISIONS APPR. DATE.
SURVEY
PG&E
EBMUD
CALTRANS
APPROVED BY BY DATE APPROVED BY
CITY ENGINEER
DATE: HORIZ. SCALE VERT. SCALE
CITY OF EMERYVILLE, CALIFORNIA
DEPARTMENT OF PUBLIC WORKS
TRASH CAPTURE DESIGN PROJECT
DESIGN WORK ORDER. NO.: XXXXX
CONSTR. WORK ORDER. NO.: XXXXX
SHEET OF
Schaaf Wheeler
CONSULTING CIVIL ENGINEERS
4699 OLD IRONSIDES DR., SUITE #350
SANTA CLARA, CA 95054
(408) 246-4848
DATE: 9/1/2022
DESIGNED BY: FTS DRAWN BY: FM CHECKED BY: CJT
BLUEPRINT FOR CLEAN BAY
3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 IB IB
Pavement
Pavement
Pavement
Pavement Pavement
Concrete Concrete
Concrete
Concrete
Concrete
Landscape
Landscape
Landscape
Landscape
MACARTHUR BLVD 2+75 3+00 3+25 3+50 3+75 4+00 4+16 EX. 36" STEEL SD EX. 36" STEEL SD
CATCH BASIN
RIM = 27.06'
INV. = 25.06' (ASSUMED) (12" OUT)
MACARTHUR BLVD
BASIS OF BEARING
N73° 43' 01.27"E
415.98
BASIS OF BEARING
N73° 20' 51.42"E
415.98
BASIS OF BEARING
N73° 04' 23.09"E
415.98
STA: 3+34
SDMH RIM = 27.16'
INV. = 18.86' 6"(IN-NE)
INV. = 22.39' 12"(IN-S)
INV. = 17.66' 27"(THRU-E)
SSMH
RIM = 26.89'
INV. = 20.59' 12"(THRU)
(E) 36" SD CULVERT
(E) FENCE
(E) BACK OF CURB
(E) 2" GAS LINE
(E) 2" GAS LINE
BACK OF CURB
(E) 12" SS
(E) WATERLINE
FACE OF CURB
GUTTER
(E) FRONT OF CURB
(E) GUTTER
(E) WHITE PAVEMENT MARKING.
(E) STREET LIGHT.
(E) WROUGHT IRON
FENCE
(E) WROUGHT IRON
FENCE
20"TR
8"TR
36"TR
48"TR
3"TR
14"TR
54"TR
6'-9"
POINT 3
N - 2128954
E - 6047167
POINT 4
N - 2128965
E - 6047202 0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00 3+25 3+50 3+75 4+00 4+16 EX. 36" STEEL SD EX. 36" STEEL SD
STA: 3+34
POINT 1
N - 2128867
E - 6046869
POINT 2
N - 2128963
E - 6047196
FILE NAME:4 EXISTING SITE AND CONTROL PLAN.dwg
10 UNDERGROUND
SERVICE ALERT
NORTH 811
CALL: TOLL FREE
1-800-227-2600
TWO WORKING DAYS BEFORE YOU DIG
MARK REVISIONS APPR. DATE.
SURVEY
PG&E
EBMUD
CALTRANS
APPROVED BY BY DATE APPROVED BY
CITY ENGINEER
DATE: HORIZ. SCALE VERT. SCALE
CITY OF EMERYVILLE, CALIFORNIA
DEPARTMENT OF PUBLIC WORKS
TRASH CAPTURE DESIGN PROJECT
DESIGN WORK ORDER. NO.: XXXXX
CONSTR. WORK ORDER. NO.: XXXXX
SHEET OF
Schaaf Wheeler
CONSULTING CIVIL ENGINEERS
4699 OLD IRONSIDES DR., SUITE #350
SANTA CLARA, CA 95054
(408) 246-4848
DATE: 9/1/2022
DESIGNED BY: FTS DRAWN BY: FM CHECKED BY: CJT
EXISTING SITE AND
CONTROL PLAN
4 GENERAL NOTES
1. THE TYPES, LOCATIONS, SIZES AND/OR DEPTHS OF EXISTING UNDERGROUND UTILITIES AS
SHOWN ON THIS TOPOGRAPHIC SURVEY WERE OBTAINED FROM SOURCES OF VARYING RELIABILITY. THE CONTRACTOR IS CAUTIONED THAT ONLY ACTUAL EXCAVATION WILL
REVEAL THE TYPES, EXTENT, SIZES, LOCATIONS AND DEPTHS OF SUCH UNDERGROUND UTILITIES. (A REASONABLE EFFORT HAS BEEN MADE TO LOCATE AND DELINEATE ALL KNOW UNDERGROUND UTILITIES). HOWEVER, THE ENGINEER CAN ASSUME NO RESPONSIBILITY FOR
THE COMPLETENESS OR ACCURACY OF ITS DELINEATION OF SUCH UNDERGROUND UTILITIES WHICH MAY BE ENCOUNTERED, BUT WHICH ARE NOT SHOWN ON THESE DRAWINGS.
CONTROL NOTES
2. BENCHMARK NUMBER 2: STANDARD OAKLAND DISK IN WALK WEST OF WEST CURB OF ADELINE STREET AT THE INTERSECTION OF SAN PABLO AVE., ADELINE STREET AND 38TH STREET.
ELEVATION: 34.72
DATUM: NGVD29
3. THE BEARING OF NORTH 84° 14' 01" EAST TAKEN ON THE MONUMENT LINE OF MCARTHUR
BOULEVARD AS SHOWN ON THAT CERTAIN CAL-TRANS RIGHT-OF-WAY RECORD MAP NUMBER R-4.9, FILED FOR RECORD ON MARCH, 1991, OFFICIAL RECORDS OF ALAMEDA COUNTY WAS TAKEN AS THE BASIS FOR ALL BEARINGS SHOWN HEREON.
4. THE DEVELOPER AND/OR CONTRACTOR SHALL BE RESPONSIBLE FOR THE PREPARATION
AND FILING OF PRE-CONSTRUCTION AND POST-CONSTRUCTION CORNER RECORDS FOR ANY
MONUMENTS OR PROPERTY CORNERS SHOWN HEREON THAT MAY BE DESTROYED DURING IMPROVEMENTS TO THE SUBJECT PROPERTY AS DEFINED IN SECTION 8771(B) OF THE PROFESSIONAL LAND SURVEYORS ACT.
GRAPHIC SCALE
(IN FEET)
5 0 5 10
1" = 5'
2.5 20
POTHOLE TABLE
CROSSING
UTILITY
TYPE/SIZE DEPTH (TOP OF PIPE)
EXIST. STEEL SD 7'-5"
EXIST. STEEL SD 7'-0"
SITE CONTROL POINT TABLE
POINT # NORTHING EASTING DESCRIPTION
2128867 6046869 EXISTING SDMH
2128963 6047196 EXISTING SDMH
GRAPHIC SCALE
(IN FEET)
40 0 5 80
1" = 40'
20 160
PLAN VIEW
1" = 5'
PLAN VIEW
1" = 40'
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 IB IB
Pavement
Pavement
Pavement
Concrete Concrete
Concrete
Concrete
Concrete
Landscape
Landscape
Landscape
Landscape
MACARTHUR BLVD 2+75 3+00 3+25 3+50 3+75 4+00 4+16 EX. 36" STEEL SD EX. 36" STEEL SD
CATCH BASIN
RIM = 27.06'
INV. = 25.06' (ASSUMED) (12" OUT)
MACARTHUR BLVD
BASIS OF BEARING
N73° 43' 01.27"E
415.98
BASIS OF BEARING
N73° 20' 51.42"E
415.98
BASIS OF BEARING
N73° 04' 23.09"E
415.98
STA: 3+34
SDMH RIM = 27.16'
INV. = 18.86' 6"(IN-NE)
INV. = 22.39' 12"(IN-S)
INV. = 17.66' 27"(THRU-E)
SSMH
RIM = 26.89'
INV. = 20.59' 12"(THRU)
(E) 36" SD CULVERT
(E) FENCE
(E) BACK OF CURB
(E) 2" GAS LINE
(E) 2" GAS LINE
BACK OF CURB
(E) 12" SS
(E) WATERLINE
FACE OF CURB
GUTTER
(E) FRONT OF CURB
(E) GUTTER
(E) STREET LIGHT.
(E) WROUGHT IRON
FENCE
(E) WROUGHT IRON
FENCE
20"TR
8"TR
36"TR
48"TR
3"TR
14"TR
54"TR
22'
15' XX XX XX XX XX
XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX
XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX XX
DEMOLISH APPROX.
22' OF EXIST. STEEL
SD PIPE
FENCE APPROX. WORK AREA,
PLACE FIBER ROLLS AROUND
DISTURBED AREAS.
SEE NOTE 6
PROTECT (E) SD MH.
PROTECT (E) SS
IN-PLACE REMOVE AND
REPLACE (E) STREET
LIGHT IN PLACE. SEE
NOTE 5
CONTRACTOR TO REMOVE
EXIST. 48" DIAMETER
EUCALYPTUS TREE PER
ARBORIST
RECOMMENDATION
DEMOLISH (E)
CURB &
GUTTER
APPROX. LIMITS
OF DEEP
EXCAVATION
REPLACE 6" AC OVER 8" CLASS 2 AB
(APPROX. 56 FT
2 ) WITHIN EXCAVATION AREA
PROTECT (E)
TREE
PROTECT
(E) FENCE
EXTEND CURB AND GUTTER
DEMO
TO LIMITS OF NEW CURB AND
GUTTER
REMOVE EX. CATCH
BASIN AND PROTECT EX. 12"
STORM DRAIN LATERAL
DEMO/SAWCUT EXISTING OPENING
AS REQUIRED FOR INSTALLATION
OF NEW 36-INCH RCP INSTALLATION
FILE NAME:5 DEMOLITION PLAN.dwg
10 UNDERGROUND
SERVICE ALERT
NORTH 811
CALL: TOLL FREE
1-800-227-2600
TWO WORKING DAYS BEFORE YOU DIG
MARK REVISIONS APPR. DATE.
SURVEY
PG&E
EBMUD
CALTRANS
APPROVED BY BY DATE APPROVED BY
CITY ENGINEER
DATE: HORIZ. SCALE VERT. SCALE
CITY OF EMERYVILLE, CALIFORNIA
DEPARTMENT OF PUBLIC WORKS
TRASH CAPTURE DESIGN PROJECT
DESIGN WORK ORDER. NO.: XXXXX
CONSTR. WORK ORDER. NO.: XXXXX
SHEET OF
Schaaf Wheeler
CONSULTING CIVIL ENGINEERS
4699 OLD IRONSIDES DR., SUITE #350
SANTA CLARA, CA 95054
(408) 246-4848
DATE: 9/1/2022
DESIGNED BY: FTS DRAWN BY: FM CHECKED BY: CJT
NOTES
1. CONTRACTOR SHALL DEMOLISH EXISTING CURB AND GUTTER, LANDSCAPING AND
AC PAVEMENT AS NECESSARY WITHIN LIMITS OF EXCAVATION AS SHOWN ON DRAWINGS. CONTRACTOR SHALL LIMIT DEMOLITION TO AREA WITHIN EXCAVATION LIMITS. CONTRACTOR IS RESPONSIBLE FOR REPAIRING AND/OR REPLACING
DAMAGED OR DEMOLISHED EXISTING HARDSCAPE & SOFTSCAPING OUTSIDE OF
LIMITS SHOWN ON PLANS
2. CONTRACTOR TO CONTACT PG&E PRIOR TO CONSTRUCTION WHEN WORKING WITHIN 10' OF (E) GAS LINE
3. ALL DEMOLITION MAY NOT BE SHOWN ON PLAN, CONTRACTOR IS RESPONSIBLE FOR
DEMOLISHING AND REPLACING IN KIND AS NEEDED FOR CONSTRUCTION
4. CONTRACTOR TO PROVIDE SUITABLE SHORING AND DEWATERING FOR EXCAVATION.
SHORING PLAN AND DEWATERING PLAN TO BE SUBMITTED TO THE ENGINEER FOR
APPROVAL PRIOR TO BEGINNING EXCAVATION
5. CONTRACTOR TO LOCATE AND PROTECT EXISTING BURIED ELECTRICAL LINE DURING CONSTRUCTION.
6. CONTRACTOR TO OBTAIN TEMPORARY CONSTRUCTION EASEMENT FROM ADJACENT PROPERTY OWNER FOR WORK WITHIN PRIVATE PROPERTY.
DEMOLITION PLAN
5 GRAPHIC SCALE
(IN FEET)
5 0 5 10
1" = 5'
2.5 20
PLAN VIEW
1" = 5'
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 IB IB
Concrete Concrete
Concrete
Concrete
Landscape
Landscape
Landscape
Landscape
MACARTHUR BLVD 2+75 3+00 3+25 3+50 3+75 4+00 4+16 EX. 36" STEEL SD EX. 36" STEEL SD
CATCH BASIN
RIM = 27.06'
INV. = 25.06' (ASSUMED) (12" OUT)
MACARTHUR BLVD
BASIS OF BEARING
N73° 43' 01.27"E
415.98
BASIS OF BEARING
N73° 20' 51.42"E
415.98
BASIS OF BEARING
N73° 04' 23.09"E
415.98
STA: 3+34
SDMH RIM = 27.16'
INV. = 18.86' 6"(IN-NE)
INV. = 22.39' 12"(IN-S)
INV. = 17.66' 27"(THRU-E)
SSMH
RIM = 26.89'
INV. = 20.59' 12"(THRU)
(E) 36" SD CULVERT
(E) FENCE
(E) BACK OF CURB
(E) 2" GAS LINE
BACK OF CURB
(E) 12" SS
FACE OF CURB
GUTTER
(E) STREET LIGHT.
(E) WROUGHT IRON
FENCE
(E) WROUGHT IRON
FENCE
20"TR
8"TR
36"TR
48"TR
3"TR
14"TR
54"TR
FOR TRENCH BACKFILL
AND BEDDING
SEE DETAIL
INSTALL CONC. COLLAR
SEE DETAIL
INSTALL 3-FT MIN SEGMENT
OF NEW CONC.PIPE
7 1
7 2
24" X 48" CLR H-20
TRAFFIC RATED HATCH 48" X 48" CLR H-20
TRAFFIC RATED HATCH
DUAL STAGE HYDRODYNAMIC
SEPARATOR. SEE DETAIL
POUR 14' x 25' CONC. PAD
SEE DETAIL
INSTALL CALTRANS
TYPE E CURB (END).
SEE CALTRANS
STANDARD PLAN RSP
A87A ON SHEET 8
INSTALL CALTRANS
"TYPE E" CURB (START)
SEE CALTRANS
STANDARD PLAN RSP
A87A ON SHEET 8
7 3
7 1
INSTALL CALTRANS STANDARD
CATCH BASIN "TYPE G1"
RIM 27.06'
INV. = 24.39' (12" OUT)
SEE DETAIL
EXTEND NEW RCP INTO EXIST.
MANHOLE AND FILL VOIDS
USING NON-SHRINK GROUT.
LIMITS OF
THICKENED SLAB
9 1
FG = EG + 1" FG = EG + 1" 2%MAX
10'
15'
20'
25'
30' 3+00 3+10 3+20 3+30 3+40 3+50 3+60
EX. 36" STEEL SD
EX. 36" STEEL SD
SDMH RIM = 27.16'
DUAL STAGE
HYDRODYNAMIC SEPARATOR
SEE DETAIL
7 1
DEVICE INTERNALS NOT
SHOWN FOR CLARITY
CONTRACTOR TO INSTALL SLIDE
GATE ON UPSTREAM AND
DOWNSTREAM SIDES OF
HYDRODYNAMIC SEPARATOR UNIT,
SEE DETAIL
10 1
EL = 15'±
EL = 27'±
12'±
10 UNDERGROUND
SERVICE ALERT
NORTH 811
CALL: TOLL FREE
1-800-227-2600
TWO WORKING DAYS BEFORE YOU DIG
MARK REVISIONS APPR. DATE.
SURVEY
PG&E
EBMUD
CALTRANS
APPROVED BY BY DATE APPROVED BY
CITY ENGINEER
DATE: HORIZ. SCALE VERT. SCALE
CITY OF EMERYVILLE, CALIFORNIA
DEPARTMENT OF PUBLIC WORKS
TRASH CAPTURE DESIGN PROJECT
DESIGN WORK ORDER. NO.: XXXXX
CONSTR. WORK ORDER. NO.: XXXXX
SHEET OF
Schaaf Wheeler
CONSULTING CIVIL ENGINEERS
4699 OLD IRONSIDES DR., SUITE #350
SANTA CLARA, CA 95054
(408) 246-4848
DATE: 9/1/2022
DESIGNED BY: FTS DRAWN BY: FM CHECKED BY: CJT
FILE NAME:6 IMPROVEMENTS PLAN.dwg
NOTES
1. CONTRACTOR TO VERIFY INVERT ELEVATION IN FIELD AND SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A SIGNIFICANT DIFFERENCE IN ELEVATION (± .1') . DIFFERENCES IN INVERT OF LESS THAN 4"
SHALL NOT BE CONSIDERED A CHANGED CONDITION
2. CONTRACTOR SHALL NOT START CONSTRUCTION UNTIL THERE ARE APPROVED SHOP DRAWINGS OF
TREATMENT DEVICE INTERNAL COMPONENTS
3. CONTRACTOR SHALL RESTORE ALL TRAFFIC MARKINGS DAMAGED DURING CONSTRUCTION ACTIVITIES.
IMPROVEMENTS PLAN
6 GRAPHIC SCALE
(IN FEET)
5 0 5 10
1" = 5'
2.5 20
PLAN VIEW
1" = 5'
PROFILE VIEW
HOR. SCALE: 1" = 5'
VERT. SCALE: 1" = 5'
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 #5 REINF. BARS @ 12"X12" O.C. E.W.
CONCRETE SLAB
10" MIN AB
TYP
8"
(E) SUBGRADE OR
BACKFILL TO 95%
COMPACTION
1'-6"
1'-6"
(2) #5 CONT. TYP.
10 UNDERGROUND
SERVICE ALERT
NORTH 811
CALL: TOLL FREE
1-800-227-2600
TWO WORKING DAYS BEFORE YOU DIG
MARK REVISIONS APPR. DATE.
SURVEY
PG&E
EBMUD
CALTRANS
APPROVED BY BY DATE APPROVED BY
CITY ENGINEER
DATE: HORIZ. SCALE VERT. SCALE
CITY OF EMERYVILLE, CALIFORNIA
DEPARTMENT OF PUBLIC WORKS
TRASH CAPTURE DESIGN PROJECT
DESIGN WORK ORDER. NO.: XXXXX
CONSTR. WORK ORDER. NO.: XXXXX
SHEET OF
Schaaf Wheeler
CONSULTING CIVIL ENGINEERS
4699 OLD IRONSIDES DR., SUITE #350
SANTA CLARA, CA 95054
(408) 246-4848
DATE: 9/1/2022
DESIGNED BY: FTS DRAWN BY: FM CHECKED BY: CJT
FILE NAME:7 DETAILS.dwg
DETAILS
7 24" MIN 24" MIN
12" MIN
12" MIN
- CONCRETE COLLAR TO PRECAST CONCRETE LTC STRUCTURE DETAIL 2 NTS
GENERAL NOTES
1. FOR RCP PIPE DIAMETERS FROM 30 TO 66 INCHES.
2. CONCRETE SHALL BE CLASS A
3. REINFORCEMENT CONFORM TO ASTM 615 GRADE60
6 2 PLAN VIEW
NTS
-2
VARIES
3' MIN
MAX 12" LIFT
- TYPICAL TRENCH DETAIL FOR IN-LINE HDS DEVICE 1
NTS
GENERAL NOTES
1. BACKFILL PER MANUFACTURER'S INSTRUCTIONS AND PER SECTION 31000 OF THE TECHNICAL SPECIFICATIONS. AREAS THAT CANNOT BE COMPACTED DUE TO ACCESS LIMITATIONS SHALL BE BACKFILLED USING CDF UPON THE CITY ENGINEER'S APPROVAL.
2. THE CONTRACTOR SHALL COORDINATE WITH THIRD PARTY OR THE CITY MATERIAL
TESTING LABORATORY (MTL) IN ADVANCE TO PROVIDE THE ASTM COMPACTION CURVE DATA PER ASTM D1557. CONTRACTOR SHALL HIRE CERTIFIED CONFINED SPACE
INSPECTORS TO PERFORM COMPACTION TESTINGS IN TRENCHES AND PITS THAT ARE GREATER THAN 5 FEET DEEP.
3. A MUD SLAB/SEAL COURSE MAY BE CONSTRUCTED AS A REPLACEMENT TO STABILIZE THE
SUBGRADE AS GROUNDWATER IS ENCOUNTERED AT THE BOTTOM OF THE EXCAVATION UPON THE CITY ENGINEER'S AND THE PROJECT GEOTECHNICAL ENGINEER'S APPROVAL.
4. A LAYER OF HIGH STRENGTH GEOGRID (TENSAR BX 1200, EQUIVALENT OR BETTER) SHALL BE PLACED IMMEDIATELY ABOVE THE SUBGRADE/BELOW THE MUD SLAB (CONCRETE). THE
GEOGRID SHALL EXTEND FURTHER UP THE SIDES OF THE PIT TO COVER THE GEOTEXTILE
TO PROVIDE PROTECTION IN CASE THE GEOTEXTILE BEING RIPPED DURING SHEET PILE EXTRACTION.
- TRENCH DETAIL SECTION A
NTS
2'
#4 BARS
@ 12" MAX
(5) #4 CIRCULAR TIES
TRASH CAPTURE DEVICE
PRECAST CONCRETE WALL
4" DOWELS X 8" LENGTH
@ 8" O.C.
OUTLET PIPE (TYP)
COLLAR (TYP)
SEE DETAIL
H-20 RATED ALUMINUM ACCESS HATCH WITH
LIFT ASSIST AND FALL PROTECTION
FLOW FLOW
SLIDE GATE TO BE INSTALLED BY CONTRACTOR
(SEE SPECIFICATIONS) (ACTUATOR NOT SHOWN FOR CLARITY)
SEE DETAIL
NEW 36" RCP PIPE
COLLAR (TYP)
SEE DETAIL
INV EL = 17.24'± (IN)
FLOW
CLASS 1 BEDDING STABILIZED
MATERIAL OR CLASS 3 AGGREGATE
BASE 95% COMPACTION PER ASTM
D1557/D6938 (SEE NOTES 2, 3 & 4)
BACKFILL WITH
CDF AS REQUIRED
(SEE NOTE 1) (TYP)
SEE NOTES 1 & 2 (TYP) CONTRACTOR TO GROUT
TO FINISHED GRADE (TYP)
SLIDE GATES AND ACTUATORS
TO BE INSTALLED BY CONTRACTOR,
(TYP OF 2) (SEE SPECIFICATIONS)
SEE DETAIL
EXISTING 36" DIAMETER
STEEL SD PIPE
NEW SD PIPE,
LENGTH AS REQUIRED
FOR CONSTRUCTION
EL = 15'±
EXIST. STEEL PIPE
EL = 27'±
INV. EL = 17.20'± (OUT)
NEW 36" RCP PIPE
FLOW
- CONCRETE SLAB DETAIL 3
NTS
A
-
(E) SDMH
24" 48"
48" 48"
FILL ANNULAR SPACE W/
NON-SHRINK GROUT
INSTALL LINKSEAL OR EQUAL PER
MFG'S RECOMMENDATIONS
DRILL HOLE FOR DOWELS, FILL
ANNULAR SPACE WITH 2 PART
EPOXY ANCHOR ADHESIVE
(TYP)
4" MIN
10 1
10 1
CONCRETE RISERS AND
HATCHES TO BE INSTALLED
BY CONTRACTOR
CONCRETE RISERS AND
HATCHES TO BE
INSTALLED BY CONTRACTOR
TRASH CAPTURE DEVICE
TO BE PROCURED BY OTHERS
AND INSTALLED BY CONTRACTOR
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 10 UNDERGROUND
SERVICE ALERT
NORTH 811
CALL: TOLL FREE
1-800-227-2600
TWO WORKING DAYS BEFORE YOU DIG
MARK REVISIONS APPR. DATE.
SURVEY
PG&E
EBMUD
CALTRANS
APPROVED BY BY DATE APPROVED BY
CITY ENGINEER
DATE: HORIZ. SCALE VERT. SCALE
CITY OF EMERYVILLE, CALIFORNIA
DEPARTMENT OF PUBLIC WORKS
TRASH CAPTURE DESIGN PROJECT
DESIGN WORK ORDER. NO.: XXXXX
CONSTR. WORK ORDER. NO.: XXXXX
SHEET OF
Schaaf Wheeler
CONSULTING CIVIL ENGINEERS
4699 OLD IRONSIDES DR., SUITE #350
SANTA CLARA, CA 95054
(408) 246-4848
DATE: 9/1/2022
DESIGNED BY: FTS DRAWN BY: FM CHECKED BY: CJT
FILE NAME:8 DETAILS.dwg
DETAILS
8 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 10 UNDERGROUND
SERVICE ALERT
NORTH 811
CALL: TOLL FREE
1-800-227-2600
TWO WORKING DAYS BEFORE YOU DIG
MARK REVISIONS APPR. DATE.
SURVEY
PG&E
EBMUD
CALTRANS
APPROVED BY BY DATE APPROVED BY
CITY ENGINEER
DATE: HORIZ. SCALE VERT. SCALE
CITY OF EMERYVILLE, CALIFORNIA
DEPARTMENT OF PUBLIC WORKS
TRASH CAPTURE DESIGN PROJECT
DESIGN WORK ORDER. NO.: XXXXX
CONSTR. WORK ORDER. NO.: XXXXX
SHEET OF
Schaaf Wheeler
CONSULTING CIVIL ENGINEERS
4699 OLD IRONSIDES DR., SUITE #350
SANTA CLARA, CA 95054
(408) 246-4848
DATE: 9/1/2022
DESIGNED BY: FTS DRAWN BY: FM CHECKED BY: CJT
FILE NAME:9 DETAILS.dwg
DETAILS
9 - CALTRANS SD DETAIL D72B 1
NTS
- EMERYVILLE CITY STANDARD DETAIL AC PAVEMENT REPLACEMENT 2 NTS
CLASS 2 AG BASE
95% RELATIVE COMPACTION
90% RELATIVE
COMPACTION
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3
SECTION A-A
AS NEEDED FOR SLIDE
GATE INSTALLATION
1 2" Ø STAINLESS STEEL MOUNTING
PLATE BOLTS, TYP. OF 4
5 8
" STAINLESS STEEL CONCRETE
ANCHORS, (TYP OF 6)
1 2
" Ø STAINLESS STEEL
BOLTS, TYP. OF 4
4"x4"x
1 4
" ANGLE
IRON SUPPORT
3.5" MIN
MANUAL ACTUATOR
WITH HAND WHEEL
ACCESS HATCH
W4X13 SS, TYP. OF 2
PRECAST GRINDER BOX
STRUCTURE
24"
B
1 2
" Ø 316 SS MOUNTING PLATE BOLTS
(TYP OF 4)
ACTUATOR NOT
SHOWN FOR CLARITY
ACTUATOR STEM OPENING
IN MOUNTING PLATE
ACTUATOR
MOUNTING BOLTS,
PER MANUFACTURER
RECOMMENDATIONS SLIDE GATE, INSTALLED
BELOW PER MANUFACTURER
RECOMMENDATIONS
4"X4"X
1 2
" SS
MOUNTING ANGLE
W4X13 SS ACTUATOR
SUPPORT BEAMS
(TYP OF 2)
A A
B
AS REQD
3/4"
31/2 3/4" 1/2"
STEM GUIDE FROM
MANUFACTURER
STAINLESS STEEL STEM GUIDE
MOUNTING BOLTS, Ø AS
REQUIRED BY MANUFACTURER 2"
3 8
" 316 STAINLESS STEEL
CONCRETE ANCHORS
1 2
" Ø BOLT HOLE FOR
3 8
" ANCHOR BOLT,
TYP OF 4
1 4
" X3-1/2" SS
MOUNTING PLATE
1 4
"X1"X1" SS ANGLE
SECTION B-B
SECTION A-A
PER MANUFACTURER'S
RECOMMENDATIONS
SLIDE GATE STEM
STEM GUIDE MOUNTING PATTERN,
CONTRACTOR TO MODIFY PATTERN AS
NECESSARY FOR INSTALLATION PER
MANUFACTURER RECOMMENDATION
STAINLESS STEEL STEM GUIDE
MOUNTING PLATE
STEM HOLE THROUGH MOUNTING PLATE,
Ø AS REQUIRED FOR INSTALLATION
3 8
" STAINLESS
STEEL CONCRETE
ANCHORS
1 4
" SS MOUNTING
PLATE
AS REQUIRED FOR STEM
GUIDE INSTALLATION
1/4"
B
B
A A
STEM GUIDE NOT
SHOWN FOR CLARITY
3-1/2"
B
C
A CA
B
4" MIN
GROUT
4" MIN
6"
INVERT
ANCHOR BOLTS, LOCATIONS AS
REQUIRED BY MANUFACTURER, TYP
SLIDE GATE INVERT
ANGLE (FLUSH MOUNT)
GROUT
SEE NOTE 1
NOTES
1. CONTRACTOR TO INSTALL SLIDE GATE PER MANUFACTURER
RECOMMENDATIONS.
2. ALL HARDWARE TO BE PROVIDED BY MANUFACTURE AND INSTALLED PER MANUFACTURER RECOMMENDATIONS.
SECTION A-A SECTION B-B SECTION C-C
4" MIN
1 2" Ø STAINLESS STEEL
MOUNTING PLATE
BOLTS (TYP OF 4)
1 4
" ACTUATOR MOUNTING PLATE
THROUGH HOLE FOR
SLIDE GATE STEM, Ø
PER MANUFACTURER
RECOMMENDATIONS
ACTUATOR MOUNTING
BOLTS, PER MANUFACTURER
RECOMMENDATIONS
4"x4"x
1 4
" ANGLE IRON
SUPPORT
5 8
" STAINLESS STEEL
CONCRETE ANCHOR BOLTS
(TYP OF 6)
W4X13 SS (TYP OF 2)
1 2
" Ø STAINLESS STEEL
BOLTS (TYP OF 4)
4" MIN
SECTION B-B
10 UNDERGROUND
SERVICE ALERT
NORTH 811
CALL: TOLL FREE
1-800-227-2600
TWO WORKING DAYS BEFORE YOU DIG
MARK REVISIONS APPR. DATE.
SURVEY
PG&E
EBMUD
CALTRANS
APPROVED BY BY DATE APPROVED BY
CITY ENGINEER
DATE: HORIZ. SCALE VERT. SCALE
CITY OF EMERYVILLE, CALIFORNIA
DEPARTMENT OF PUBLIC WORKS
TRASH CAPTURE DESIGN PROJECT
DESIGN WORK ORDER. NO.: XXXXX
CONSTR. WORK ORDER. NO.: XXXXX
SHEET OF
Schaaf Wheeler
CONSULTING CIVIL ENGINEERS
4699 OLD IRONSIDES DR., SUITE #350
SANTA CLARA, CA 95054
(408) 246-4848
DATE: 9/1/2022
DESIGNED BY: FTS DRAWN BY: FM CHECKED BY: CJT
FILE NAME:10 SLIDE GATE DETAILS.dwg
SLIDE GATE DETAILS
10 - SLIDE GATE MOUNTING DETAIL 1
NTS
- SLIDE GATE STEM SUPPORT DETAIL 2
NTS
- ACTUATOR MOUNTING DETAIL 3
NTS
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3
CALIFORNIA
REV 08/2020 Page 1 of 5
EXHIBIT B
Contract Insurance Requirements
Trash Capture Project EPW 18107
As used in this Exhibit B, Contractor refers to
1. MINIMUM REQUIREMENTS
Contractor shall, at its expense, procure and maintain for the duration of the Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work or Services required by the Contract hereunder by Contractor, its agents, representatives, employees or subcontractors. Contractor shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Contract. Such insurance shall meet at least the following minimum levels of coverage, as checked below:
1.1 Minimum Scope of Insurance
Coverage shall be at least as broad as the latest version of the following:
General Liability
Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01).
Automobile Liability
Insurance Services Office Business Auto Coverage form number CA 00 01, code 1 (any auto) or if Contractor owns no vehicles, this requirement may be met through a non-owned auto endorsement to the General Liability Policy. Professional Liability / Errors and Omissions
Written on a policy form specifically designed to protect against acts, errors or omissions of the Contractor wherein “Covered Professional Services” as designated in the policy must specifically include Services performed under this Contract.
Workers’ Compensation and Employer’s Liability
Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. Policies shall not contain exclusions contrary to this Contract.
Pollution Liability Insurance
Pollution Liability insurance for claims arising from the discharge, dispersal release or escape or any irritant or contaminant into or upon land, any structure, the atmosphere, watercourse or body of water, including groundwater. This shall DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville | Contract Insurance Requirements (Exhibit B) REV 08/2020
include on and off-site clean up and emergency response costs and claims arising from above ground and below ground storage tanks.
1.2 Minimum Limits of Insurance
Contractor shall maintain limits no less than:
General Liability
$1,000,000.00 per occurrence and $2,000,000.00 aggregate for bodily injury, personal injury and property damage, including without limitation, blanket contractual liability.
OR
$2,000,000.00 per occurrence and $4,000,000.00 aggregate for bodily injury, personal injury and property damage, including without limitation, blanket contractual liability, and coverage for explosion, collapse and underground property damage hazards.
Automobile Liability
$2,000,000.00 per accident for bodily injury and property damage. Professional Liability / Errors and Omissions
$2,000,000.00 per claim and aggregate.
Workers’ Compensation and Employer’s Liability
Workers’ compensation limits as required by the Labor Code of the State of California. Employer’s Liability limits of $1,000,000.00 each accident, policy limit bodily injury or disease, and each employee bodily injury or disease. Pollution Liability Insurance
$2,000,000.00 per occurrence and $2,000,000.00 aggregate.
Except for the professional liability / errors and omissions policy, defense costs shall be available in addition to the limits. Notwithstanding the minimum limits specified herein, any available coverage shall be provided to the Parties required to be named as additional insureds pursuant to this Contract.
2. INSURANCE ENDORSEMENTS
The insurance policies shall contain the following provisions, if checked, or Contractor shall provide endorsements (amendments) on forms supplied or approved by the City to add the following provisions, if checked, to the insurance policies:
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville | Contract Insurance Requirements (Exhibit B) REV 08/2020
General Liability
(1) Such policy shall provide the City, its officials, employees, agents and authorized volunteers additional insured status using ISO endorsements CG20 10 or CG20 37, or endorsements providing the exact same coverage, with respect to the work or operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such work; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; (3) the insurance coverage shall be primary insurance as respects the City, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self-insurance maintained by the City, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it; and (4) the insurance coverage shall contain standard separation of insureds provisions.
Automobile Liability
(1) Such policy shall provide the City, its officials, employees, agents and authorized volunteers additional insured status with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the City, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self-insurance maintained by the City, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it in any way.
Professional Liability Coverage
Any policy inception date, continuity date, or retroactive date must be before the effective date of this Contract and Contractor agrees to maintain continuous coverage through a period no less than three years after termination of the Contract.
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville | Contract Insurance Requirements (Exhibit B) REV 08/2020
Workers’ Compensation and Employer’s Liability Coverage The insurer shall agree to waive all rights of subrogation against the City, its officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy which arise from work performed by Contractor. Pollution Liability Coverage
(1) Such policy shall give the City, its officials, employees, agents and authorized volunteers additional insured status with respect to claims arising from the discharge, dispersal release or escape or any irritant or contaminant into or upon land, any structure, the atmosphere, watercourse or body of water, including groundwater; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the City, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self-insurance maintained by the City, its officials, employees, agents and authorized volunteers shall be excess of Contractor’s insurance and shall not be called upon to contribute with it in any way.
ALL COVERAGES
Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or canceled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its officials, employees, agents and authorized volunteers.
3. NO SPECIAL LIMITATIONS
The required insurance shall not contain any special limitations on the scope of protection afforded to the City, its officials, employees, agents and authorized volunteers.
4. DEDUCTIBLES AND SELF-INSURANCE RETENTIONS
Any deductibles or self-insured retentions must be declared to and approved by the City. Contractor shall guarantee that, at the option of the City, either: (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officials, employees, agents and authorized volunteers; or (2) the Contractor shall procure a bond or other financial guarantee acceptable to the City guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses.
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 City of Emeryville | Contract Insurance Requirements (Exhibit B) REV 08/2020
5. ACCEPTABILITY OF INSURERS
Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A-:VII, licensed to do business in California, and satisfactory to the City. Exception may be made for the State Compensation Insurance Fund when not specifically rated.
6. VERIFICATION OF COVERAGE
Contractor shall furnish City with original certificates of insurance and endorsements effecting coverage required by this Contract on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms supplied or approved by the City. All certificates and endorsements must be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance policies, at any time.
7. SUBCONTRACTORS
All subcontractors shall meet the requirements of this Section before commencing any work. Contractor shall furnish separate certificates and endorsements for each subcontractor. Subcontractor policies of General Liability insurance shall name the City, its officials, employees, agents and authorized volunteers as additional insureds using form ISO 20 38 04 13 or endorsements providing the exact same coverage. All coverages for subcontractors shall be subject to all of the requirements stated herein except as otherwise agreed to by the City in writing.
8. REPORTING OF CLAIMS
Contractor shall report to the City, in addition to Contractor’s insurer, any and all insurance claims submitted by Contractor in connection with the work performed under this Contract.
Attach:
Insurance Certificate and Endorsements
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-25
PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS that,
WHEREAS, the City of Emeryville, a municipal corporation located in Alameda County, State of California (hereinafter referred to as "City"), has entered into a Contract with , (hereinafter referred to as "Principal"), to construct the TRASH CAPTURE PROJECT, Project No. EPW 18-107; and
WHEREAS, the Principal is required under the terms of the Contract to furnish a bond for the faithful performance of said Contract.
NOW, THEREFORE, we, the Principal and , as
Surety, are held and firmly bound unto the City in the penal sum of ($ _______ ), lawful money of the United States of America, being not less than one hundred percent (100%) of the Contract Amount, to be paid to the City or its successors and assigns; for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if the above-bound Principal, or its heirs, executors, administrators, successors, transferees, or assigns approved by the City, shall promptly and faithfully perform the covenants, conditions, and agreements in the Contract until completion, during the original term and any extensions thereof as may be granted by the City, with or without notice to Surety, and shall also promptly and faithfully perform all covenants, conditions, and agreements of any alteration of the Contract made as therein provided, notice of which alterations to Surety being hereby waived, provided on the Principal’s part to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City, its officers employees and agents, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
FURTHERMORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that upon Final Completion of the Contract, the above obligation shall be reduced to the amount of ______________________ Dollars, ($ ________ ), being not less than twenty percent (20%) of the Contract Amount, and shall hold for a period of two (2) years, during which time if the above bound Principal, or its heirs, executors, administrators, successors, transferees, or assigns shall fail to make full, complete and satisfactory repair and replacements or totally to protect the City from loss or damage made evident during said period from the date of Final Completion of the Contract, and resulting from or caused by defective materials or faulty workmanship in the prosecution of the work done, or failure to satisfy the warranty as set forth in the Contract, the above obligation in said sum of $ , shall remain in full force and effect, otherwise the above obligation shall be void.
Whenever Principal shall be declared by the City to be in default under the Contract, Surety shall promptly remedy the default, or shall promptly do one of the following at the City’s election:
1. Undertake through its agents or independent Contractors, reasonably acceptable to the City, to complete the Contract in accordance with its terms and conditions and to pay and perform all obligations of Principal under the Contract, including without limitation, all obligations with respect to warranties, guarantees, and the payment of liquidated damages.
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-26
2. Reimburse the City for all costs the City incurs in completing the Contract, and in correcting, repairing or replacing any defects in materials or workmanship and/or materials and workmanship which do not conform to the specifications in the Contract.
Further, the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the Work to be performed thereunder or the Specifications accompanying the same shall release or exonerate the Surety on this bond or in any way affect its obligations under this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work, or to the Contract Documents.
The Surety’s obligations hereunder are independent of the obligations of any other surety for the performance of the Contract, and suit may be brought against the Surety and such other sureties, jointly and severally, or against any one or more of them, or against less than all of them without impairing the City’s rights against the others.
No right of action shall accrue on this bond to or for the use of any person or corporation other than the City or its successors or assigns.
In the event the City, or its successors or assigns, shall be the prevailing party in an action brought upon this bond, then in addition to the penal sum hereinabove specified, Principal and the Surety, jointly and severally, agree to pay to the City or its successors or assigns, a reasonable sum on account of its attorney’s fees incurred in such action, which sum shall be fixed by the court.
IN WITNESS WHEREOF, the above bound parties have executed this instrument under their seals this day of , 2022, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.
Principal
__________________________________________________
Name
__________________________________________________
Title
__________________________________________________
Signature
(SEAL)
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-27
Surety
__________________________________________________
Name
__________________________________________________
Title
__________________________________________________
Signature
(SEAL)
*Note: To be considered complete, both the Principal and an admitted Surety Insurer authorized by the California Insurance Commissioner to transact surety business in the State of California must sign the Performance Bond.
In addition, the Surety’s signature must be notarized and a copy of the Surety’s Power of Attorney DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-28
PAYMENT BOND
KNOW ALL PERSONS BY THESE PRESENTS, that
WHEREAS, the City of Emeryville, a municipal corporation located in Alameda County, State of California (hereinafter "City"), has awarded a contract to , (hereinafter "Principal"), to construct the TRASH CAPTURE PROJECT, Project No. EPW 18-107; and
WHEREAS, the Principal is required to furnish a bond in connection with the Contract, providing that if Principal, or any of it or its subcontractors, shall fail to pay for any materials, provisions, or other supplies or teams used in, upon, for or about the performance of the Work contracted to be done, for any work or labor thereon of any kind, or claims to which reference is made in Section 9554 of the Civil Code, the Surety of this bond will pay the same to the extent hereinafter set forth.
NOW, THEREFORE, we, the undersigned Principal, and _________________ , as Surety, are held and firmly bound unto the City in the penal sum of Dollars, ($ ), lawful money of the United
States of America, being not less than one hundred percent (100%) of the Contract Amount, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, or its heirs, executors, administrators, successors, transferees, assigns, or subcontractors, shall fail to pay any of the persons named in Section 9100 of the Civil Code, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under this Contract, or any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees of the Contractors and his subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, the Surety will pay for the same, in an amount not exceeding the sum specified in this bond and will also pay, in case suit is brought upon this bond, a reasonable attorney's fee, to be fixed by the court.
This bond shall inure to the benefit of any and all persons named in Section 9100 of the Civil Code so as to give a right of action to them or their assigns in any suit brought upon this bond.
This bond is given to comply with Sections 9550 and 9554 of the Civil Code. The liability of the PRINCIPAL and SURETY hereunder is governed by the provisions of said Code, all acts amendatory thereof, and all other statutes referred to therein, including Section 8152 of the Civil Code.
And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract, or to the work to be performed thereunder, or the Specifications accompanying the same shall in any way affect its obligations on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the Work or to the Contract Documents.
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-29
IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their seals this day of 2022, the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.
Principal
Name
Title
Signature
(SEAL)
Surety
Name
Title
Signature
(SEAL)
*Note:
To be considered complete, both the Principal and an admitted Surety Insurer authorized by the California Insurance Commissioner to transact surety business in the State of California must sign the Payment Bond. In addition, the Surety’s signature must be notarized and a copy of the Surety’s Power of Attorney must be attached.
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-30
GUARANTEE
TO THE CITY OF EMERYVILLE for construction of the following Project:
TRASH CAPTURE PROJECT
Project No. EPW 18-107
By signing below, Contractor hereby warrants and guaranties to City of Emeryville all ("City") construction performed on this Project, including all material and equipment incorporated therein, as set forth below:
1. Pursuant to this Guarantee, Contractor agrees to unconditionally guarantee 1) the quality and adequacy of all of work provided on the Project including, without limitation, all labor, materials, workmanship, methods of installation, and equipment provided by Contractor and/or its Subcontractors (of all tiers) in connection with the Work under normal application, installation, and use and service conditions (collectively "Work"); and 2) that the work is fit for the purposes intended. The Guarantee provided hereunder shall become effective on the date of Substantial Completion; or where applicable, the Guarantee shall become effective on the first day following Substantial Completion of a specifically defined phase of the Project; or on such other date as may be specified elsewhere in the Contract Documents; and once effective, the Guarantee shall remain operative and shall bind Contractor as further described herein for a period of two (2) years, or such longer period of time as may be prescribed by laws or regulations, or by the terms of Contract Documents ("Warranty Period").
This Guarantee is in addition to any warranties or guarantees required or provided by the manufacturer or supplier or otherwise provided at law with respect to Contractor’s duties, obligations and performance under the Contract Documents.
2. Neither final payment nor use or occupancy of the Work performed by the Contractor shall constitute an acceptance of Work not done in accordance with this Guarantee or relieve Contractor of liability with respect to any express warranties or responsibilities for faulty materials or workmanship. Contractor shall remedy any defects in the Work and pay for any damage resulting therefrom, which shall appear within the Warranty Period.
3. If, within the Warranty Period, the Work, or any portion thereof, is found to be defective, the City shall have the unqualified option to make any needed replacements or repairs itself or to have such replacements or repairs performed by Contractor. Such repairs or replacements shall include, without limitation, removal of any such defective Work and replacement of such Work with Work that is not defective, and satisfactory correction, or removal and replacement of any damage to other Work or the work of others resulting therefrom.
If City elects to have said repairs or replacements performed by Contractor, Contractor shall promptly, without cost to City, and in accordance with City’s written instructions, correct such defective Work. If City elects to perform the repairs or replacements, Contractor agrees to pay for all claims, costs, losses and damages caused by or resulting from such removal and replacement by City. While carrying out correction, or removal and replacement of defective or nonconforming Work the Contractor must provide the same insurance specified before Contract acceptance. Nonconforming Work that is remedied pursuant to this Warranty shall be subject to an extended warranty obligation for the period of two (2) years after the acceptance of the repairs to the nonconforming work.
DocuSign Envelope ID: ACECB61B-BB2A-4D8D-AF0F-8E9B93547AB3 EPW 18-107 A-31
4. Inspection of the Work shall not relieve Contractor of any of its obligations under the Contract Documents. Even though Work required to be provided under the Contract Documents has been inspected, accepted, and estimated for payment, Contractor shall, at its own expense, replace or repair any such equipment, material, or Work found to be defective or otherwise not to comply with the requirements of the Contract Documents up to the end of the applicable Warranty Period.
5. This Guarantee is not in lieu of any other liability imposed on Contractor under the Contract Documents and at law with respect to Contractor’s duties, obligations, and performance under the Contract Documents, and is in addition to any warranties or guarantees required or provided by manufacturers or suppliers. In the event of any conflict or inconsistency between the terms of this Guarantee and any obligation of the Contractor under the Contract Documents or at law, such inconsistency or conflict shall be resolved in favor of the higher level of obligation of the Contractor.
6. If the Contractor fails or refuses to comply with its obligations under this Guarantee, City shall be entitled to all costs and expenses, including attorneys' fees, reasonably incurred by reason of the said failure or refusal.
______________________________ ______________________________ Contractor Date
______________________________
Contractor's Name (print)
______________________________
Address
______________________________
City/State/Zip
______________________________
Phone
______________________________
Fax No:
END OF DOCUMENT