Cities Index.
Attachment 5 - Project Plans dated October 27, 2022

Emeryville City Council
January 17, 2023

Document
Attachment 5 - Project Plans dated October 27, 2022
Meeting
January 17, 2023
Body
Emeryville City Council
Original file
11.4 MB
Text extracted from the city's file for reading and search. Open the original on emeryville.legistar1.com. That file is the official record.

-

EMERYVILLE LIFE SCIENCES TOWER

SOLOMON CORDWELL BUENZ

CA VENTURES

P L A N N I N G C O M M I S S I O N S T U D Y S E S S I O N 10 - 27 - 2022
Attachment 5
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 2

CONTENTSSCIENCES TOWER

INTRODUCTION

PROJECT GOALS STATEMENT

1. SITE AND CONTEXT ANALYSIS

ZONING MAP

ENVIRONMENTAL CONDITIONS

NEIGHBORHOOD OPEN SPACE

BICYCLE AND TRANSIT INFRASTRUCTURE

SITE AND VICINITY PHOTOGRAPHS

ZONING HIGHLIGHTS

SITE OPPORTUNITIES AND CONSTRAINTS

2. TOWER POSITIONING

PREVIOUS SITE PLAN

PREVIOUS VS SUGGESTED SITE PLAN

TOWER SITING OPTION DIAGRAMS

3. DESIGN CONCEPT

PROPOSED SITE PLAN

SITE DIAGRAMS

STREET LEVEL EXPERIENCE

SITE SECTION

FLOOR PLANS

ELEVATIONS

AREA TABULATIONS

4. FINANCIAL FEASIBILITY UPDATE

RESIDENTIAL MARKET UPDATE

EMERYVILLE RESIDENTIAL MARKET UPDATE

EAST BAY RESIDENTIAL MARKET UPDATE

CALIFORNIA CONSTRUCTION COST UPDATE

PROJECT TEAMNCES TOWER
OWNER

CA VENTURES
448 N LASALLE, FLOOR 2
CHICAGO, IL 60654
(312) 248-2086
CONTACT: MIKE LEE
EMAIL: [email protected]

ARCHITECT

SOLOMON CORDWELL BUENZ
255 CALIFORNIA STREET, 3RD FLOOR
SAN FRANCISCO, CA 94111
(415) 216-2450
CONTACT: MELISSA GODFREY
EMAIL: [email protected]

LANDSCAPE ARCHITECT
BIONIC
PO BOX 460309
SAN FRANCISCO, CA 94146
(415) 206-0648
CONTACT: MARCEL WILSON
EMAIL [email protected]
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 3 The proposed project will fill in
this underused site with a mixeduse transit oriented development comprised of laboratory space, 30
homes for low income renters and
community serving amenity space.

The proposed 353,540 sqft of class
A and built for purpose Life Sciences
laboratory space will attract a variety
of science companies and solidify the
downtown as a major regional hub for
life saving and life changing science
and technology innovations.
30 new multi-family homes will help
establish a residential neighborhood
that will grow when the adjacent City
owned parcel is developed with more
new affordable homes.

This new residential neighborhood
will share views of a dual use
pedestrian mews and bicycle path
connecting to the existing City
bicycle network, integrating bicycling
into the new publicly accessible open
space on the site and serving multiple
needs of the community.

PROJECT GOALS
5850 Shellmound Way is at the corner of Christie
Avenue and Shellmound Way right in the middle of the
downtown core. Currently the site hosts a vacant three
story office building and surface parking lot with no
public open space.
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 4

1. SITE AND CONTEXT ANALYSIS
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 5 MUN
MUN
MUN
MUN
MUN
MUN
MUN
PO
PO
PO
PO PO
PO
PO
RMH
RMH
RM
RM
RM
RM
RM
RM
M
RH
RH
RMH
RMH
RMH
PUD-1
PUD-3
PUD-5
PUD-6
INH
INL
MUR
MUR
MUR
MUR
MUR
MUR
MUR
MUR
PUD-4
MUR
PUD-2 OT
OT
OT
OT
MUR
MUN
P
P
P
P
P
P
P
OT/DH
OT/DH
MUR
RMH
INL
SM
SM
SM
SM
PO
PO
INL
PO
UT
UT
PO
47TH STREET
45TH

HORTON STREET
HOLDE
W

SAN PABLO AVENUE
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
45TH ST

ESSEX ST
47TH ST
48TH ST
54TH ST
55TH ST

VALLEJO ST
67TH ST

VALLEJO ST
65TH ST

OCEAN AVE

DOYLE ST
61ST ST
59TH ST HOLLIS ST

SHELLMOUND STREET

POWELL ST

POWELL ST

HOLLIS ST
64TH ST
63RD ST
62ND ST
65TH ST

LACOSTE ST

CHRISTIE AVE
STREET
53RD STREET

HOLLIS STREET

DOYLE ST

BEAUDRY ST
66TH ST
EM
43RD ST
41ST ST
STREET

SALEM ST

OAKLAND CITY LIMITS

EMERYVILLE CITY LIMITS
MUN
P
UT
BAY ST

CHRISTIE AVE

HORTON ST

LEHS W DNUOML AY

SHELLMOUND STREET
UT
MUN
P

DOYLE ST

PELADEAU ST
HARUFF

STANFORD AVE
PO

FRONTAGE ROAD
§¨¦80

ZONING MAP
High Density Residential
Medium-High Density Residential
Medium Density Residential
Mixed Use with Residential
Mixed Use with Residential South
Mixed Use with Non-Residential
Office/Technology
Office/Technology Doyle Hollis North Area
Heavy Industrial
Light Industrial
Public
Marina
Park/Open Space
Shoreline Management
Planned Unit Development
Utilities/Transportation
San
Francisco
Bay
MUR
INH
INL
MUN
RMH
RH
RM
OT
P
M
PO
SM
PUD
OT/DH
UT
MURS
t (PUD)
nce Name
-007 Watergate Office Towers
-004
Marketplace Redevelopment
(Public Market)
-001 Chiron (Novartis)
-009 South Bayfront (Bay Street)
-004 Pixar
-003 Emery Village (Promenade/CVS)
Railroad
MUR

NOT TO SCALE
MUN
MUN
MUN
MUN
MUN
MUN
MUN
PO
PO
PO
PO PO
PO
PO
RMH
RMH
RM
RM
RM
RM
RM
RM
M
RH
RH
RMH
RMH
RMH
PUD-1
PUD-3
PUD-5
PUD-6
INH
INL
MUR
MUR
MUR
MUR
MUR
MUR
MUR
MUR
PUD-4
MUR
PUD-2 OT
OT
OT
OT
MUR
MUN
P
P
P
P
P
P
P
OT/DH
OT/DH
MUR
RMH
INL
SM
SM
SM
SM
PO
PO
INL
PO
UT
UT
PO
47TH STREET
45TH

HORTON STREET
HOLDE
W

SAN PABLO AVENUE
46TH ST
45TH ST
44TH ST
43RD ST
42ND ST
41ST ST
45TH ST

ESSEX ST
47TH ST
48TH ST
54TH ST
55TH ST

VALLEJO ST
67TH ST

VALLEJO ST
65TH ST

OCEAN AVE

DOYLE ST
61ST ST
59TH ST HOLLIS ST

SHELLMOUND STREET

POWELL ST

POWELL ST

HOLLIS ST
64TH ST
63RD ST
62ND ST
65TH ST

LACOSTE ST

CHRISTIE AVE
STREET
53RD STREET

HOLLIS STREET

DOYLE ST

BEAUDRY ST
66TH ST
EM
43RD ST
41ST ST
STREET

SALEM ST

OAKLAND CITY LIMITS

EMERYVILLE CITY LIMITS
MUN
P
UT
BAY ST

CHRISTIE AVE

HORTON ST

LEHS W DNUOML AY

SHELLMOUND STREET
UT
MUN
P

DOYLE ST

PELADEAU ST
HARUFF

STANFORD AVE
PO

FRONTAGE ROAD
§¨¦80

ZONING MAP
High Density Residential
Medium-High Density Residential
Medium Density Residential
Mixed Use with Residential
Mixed Use with Residential South
Mixed Use with Non-Residential
Office/Technology
Office/Technology Doyle Hollis North Area
Heavy Industrial
Light Industrial
Public
Marina
Park/Open Space
Shoreline Management
Planned Unit Development
Utilities/Transportation
San
Francisco
Bay
MUR
INH
INL
MUN
RMH
RH
RM
OT
P
M
PO
SM
PUD
OT/DH
UT
MURS
t (PUD)
nce Name
-007 Watergate Office Towers
-004
Marketplace Redevelopment
(Public Market)
-001 Chiron (Novartis)
-009 South Bayfront (Bay Street)
-004 Pixar
-003 Emery Village (Promenade/CVS)
Railroad
Context | Zoning Map
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 6

WINTER SOLSTICE

SUMMER SOLSTICE

WIND DIRECTION

SUN PATH

EASTSHORE FWY

POWELL ST

CHRISTIE AVE

SHELLMOUND WAY

W FRONTAGE RD
59TH ST
SITE

SHELLMOUND ST
Context | Environmental Conditions
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 7

EASTSHORE FWY

POWELL ST

CHRISTIE AVE

SHELLMOUND ST

SHELLMOUND WAY

W FRONTAGE RD
59TH ST
SITE
Context | Neighborhood Open Space
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 8

EMERY GO-ROUND

AMTRAK STATION

AC TRANSIT

POWELL ST

CHRISTIE AVE

SHELLMOUND WAY
59TH ST
SITE

SHELLMOUND ST
Context | Bicycle & Transit Infrastructure

BIKE NETWORK

W FRONTAGE RD

EASTSHORE FWY
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES
Aerial view North from Site Aerial view East from Site
Site from Shellmound Way Site from corner of Shellmound Way and Christie Site from corner of Christie and Shellmound Way Site from Christie Avenue Site from Shellmound Street Site from Shellmound Street Site from Shellmound Street Aerial view of Site STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 9 Context | Site and Vicinity Photographs
Aerial view West from Site Aerial view Southeast from Site © 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 10

ZONING HIGHLIGHTS
ZONING: MUR - MIX USED WITH RESIDENTIAL
ZONING OVERLAY: TRANSIT HUB & PEDESTRIAN PRIORITY ZONE
BASE FAR: 3.0 / 6.0 w/ BONUS
HEIGHT: 75 / 100+
SITE AREA: 64,862 SF
BUILDABLE AREA: 388,090 (6.0 FAR)
PROPOSED BONUS POINTS (100 REQUIRED):
50PTS AFFORDABLE HOUSING FEES
up to 50PTS COMBINATION OF PUBLIC OPEN SPACE + PUBLIC IMPROVEMENTS up to 20PTS ADDITIONAL FAMILY FRIENDLY UNITS
REQUIRED SETBACKS: NONE
STREETSCAPE REQUIREMENTS:

GREEN STREET 15FT MIN SIDEWALK CORRIDOR AT CHRISTIE AVENUE PEDESTRIAN PRIORITY 12FT MIN SIDEWALK CORRIDOR AT SHELLMOUND WAY EASEMENTS:
20 FT FOR BICYCLE PATH AT NORTH PROPERTYLINE
OPEN SPACE REQUIREMENTS: 5% OF GROSS FLOOR AREA
PROPOSED FAMILY FRIENDLY RESIDENTIAL UNIT MIX:
30 TOTAL DWELLING UNITS
15 2BD + 3BD UNITS REQUIRED (50%)
16 2BD UNITS PROPOSED (53.3%)
5 3BD UNITS PROPOSED (16.7%)
6 PROPOSED ADDITIONAL FAMILY FRIENDLY UNITS (+20%)
PROPOSED PASSENGER VEHICLES:
176 1.2 / 1000 SF FOR OFFICES (50% OF 2.4 BASE ALLOWANCE) 110 0.75 / 1000 SF FOR RESEARCH & DEVELOPMENT (50% OF 1.5 BASE ALLOWANCE) 0 4 / 1000 SF FOR RETAIL (50% OF 8.0 BASE ALLOWANCE)
315 TOTAL PARKING ALLOWED +10% OF ESTIMATED DEMAND
(REFER TO PROJECT DATA ON PAGE 30 FOR DETAILED PARKING CALCULATION) PROPOSED BICYCLE PARKING:
100+ LONG TERM (31 MIN REQUIRED 10% OF VEHICLE DEMAND)
31 SHORT TERM (10% OF VEHICLE DEMAND)
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE
15’ - 0” GREEN STREET

REQUIRED SETBACK
20’ - 0” BICYCLE PATH

NO PEDESTRIAN OR

VEHICULAR ACCESS

NO VEHICULAR ACCESS OR

DROP-OFFS ALLOWED
12’ - 0” PEDESTRIAN PRIORITY

ZONE REQUIRED SETBACK
VEHICULAR + LOADING

ACCESS MUST BE FROM

CHRISTIE AVE

AREA OWNED BY
OTHER

EXISTING PARKING LOT

ON ADJACENT PACEL

OWNED BY OTHERS
STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 11 Site | Constraints + Opportunities
5890 CHRISTIE AVE

FUTURE AFFORDABLE HOUSING

ON CITY OWNED PARCEL

CHRISTIE AVENUE

SHELLMOUND WAY

SHELLMOUND STREET
36’ - 0”
185’ - 10”
188’ - 0”
257’ - 8”
103’ - 6”
TOTAL SITE AREA:
64,682 SQFT
BUILDABLE SITE AREA:
58,306 SQFT
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 12

2. TOWER POSITIONING
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES
18' - 1"
15' - 0"

PLAZA DE
102
PTH
' - 6"

TO TOWER ABOVE
45' - 0"
12' - 0"
26' - 8"
25' - 0"
10' - 0"

LINE OF BUILDING

OVERHANG

LINE OF TOWER

FOOTPRINT ABOVE

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

LINE OF BUILDING

OVERHANG
20’ - 0” BICYCLE PATH 0
STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 13 Previous Proposal | Ground Floor
5890 CHRISTIE AVE

FUTURE AFFORDABLE HOUSING

ON CITY OWNED PARCEL CHRISTIE AVENUE

SHELLMOUND WAY

SHELLMOUND STREET

PARKING
ACCESS

RECYCLING
840 SF

AMENITIES
2,300 SF
BIKE

PARKING
1,500 SF

SETBACK
EBMUD
300 SF

UTILITIES AND FIRE

SUPPRESSION EQUIPMENT
4,900 SF
LOBBY
4,500 SF

LAB SUPPORT
6200 SF

GREEN STREET

REQUIRED SETBACK

PEDESTRIAN PRIORITY ZONE

REQUIRED SETBACK

AFFORDABLE

TOWNHOUSE
UNITS

PARKING ACCESS DISTANCE FROM

STREET CORNER MAXIMIZED

TOWER COMPLIES WITH PLANNING
CODE GREEN STREET SETBACKS.

GROUND FLOOR IS FURTHER SET
BACK TO PROVIDE ADD’TL

PEDESTRIAN SPACE

AT STREET LEVEL

PASSENGER LOADING ZONE AT

CHRISTIE AVENUE TO MINIMIZE

TRAFFIC IMPACTS

LABORATORY / OFFICE LOBBY

ADJACENT TO ELEVATORS,

FACING CHRISTIE AVENUE AND

PUBLICLY ACCESSIBLE PLAZA

ELEVATORS POSITIONED TO BEST

SERVE TOWER FLOORS ABOVE

GROUND FLOOR ACTIVE USES SET
BACK OVER 100 FT FROM CURB AT

STREET CORNER TO MAXIMIZE

PUBLIC OPEN SPACE

PUBLICLY ACCESSIBLE OPEN

SPACE AT STREET CORNER TO BE

CONTIGUOUS WITH PEDESTRIAN

AREA BEYOND PROPERTY LINE

COMMUNITY AMENITIES

VISIBLE FROM BOTH STREETS AT

CORNER OPEN SPACE

FUTURE AFFORDABLE UNITS ON

CITY OWNED PROPERTY WILL

COMPLETE FEELING OF A

RESIDENTIAL COMMUNITY

NEW AFFORDABLE UNITS FACE

ONTO MEWS CONNECTION TO

CITY BICYCLE NETWORK

RESIDENTIAL BIKE PARKING ROOM

ADJACENT TO BICYCLE PATH

LABORATORY / OFFICE BIKE

PARKING ROOM LOCATED NEAR

BICYCLE PATH

PARKING AND BACK OF HOUSE

USES FACE EXISTING PARKING LOT

WHERE FIRE PROTECTION

SETBACK IS ALLOWED TO BE ONLY
10’ - 0”

UTILITIES AND FIRE SUPPRESSION

EQUIPMENT LOCATED WHERE

OCCASIONAL ACCESS FROM

SHELLMOUND IS POSSIBLE FROM

WEST OF SLIVER OF ADJACENT
PARCEL
PREVIOUS PROPOSAL:
• 380,080 SF LABORATORY/

OFFICE SPACE
• 6 RESIDENTIAL TOWNHOMES
• 8,000 SF COMMUNITY

AMENITY
• 435 PARKING SPACES
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES

PREVIOUS PROPOSAL PROPOSAL SUGGESTED BY COMMUNITY COMMENT STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 14 Tower Siting Comparisons

SHELLMOUND WAY

CHRISTIE AVE

O P T I M I Z E
DEPTHS

O P T I M I Z E
DEPTHS

REQUIRED

SHELLMOUND WAY

CHRISTIE AVE

O P T I M I Z E
DEPTHS

O P T I M I Z E
DEPTHS
84’ - 0”

FIRE SEPARATION

NO ACCESS

FIRE SEPARATION REQUIRED

O F F I C E S PAC E CA N

BEND TO FIT SITE SHAPE

M A X I M I Z E V I E W S

TOWARDS BAY

CO M P R O M I S E D V I E W S

AT M A J O R I T Y O F

LABORATORY FLOORS

F I R E S A F E T Y R E Q U I R E S

G R E AT E R S E T BAC K

F R O M P R O P E R T Y L I N E

FOR OFFICES

PA R K I N G L AYO U T

CO N F I N E S F LO O R
SHAPE

NO ACCESS

P U B L I C

O P E N
SPACE

TOW E R C O M P L I E S W I T H
GREEN ST. SETBACK

G R O U N D F LO O R S E T

BAC K B E YO N D P L A N N I N G

C O D E R E Q U I R E M E N T TO

P R OV I D E A D D I T I O N A L

SPACE FOR PEDESTRIANS

F I R E S A F E T Y

S E BAC K F O R

G A R AG E CA N B E
ONLY 10’ - 0”

PA R K I N G G A R AG E

A N D LOA D I N G BAY

S E PA R AT E O P E N

P U B L I C S PAC E A N D
LOBBY
? TOW E R F LO O R S

CO M P R O M I S E D B Y

U N C E R TA I N T Y O F

FUTURE VIEWS

P U B L I C

O P E N
SPACE
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES

PROPOSAL SUGGESTED BY

COMMUNITY COMMENT

PREVIOUS PROPOSAL
STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 15 Section | E-W Building Section PROPERTY LINE MIN. GREEN STREET SETBACK CLEAR VIEWS TO BAY +

DOWNTOWN OAKLAND

MARKETABLE VIEWS
10’ - 0”

POTENTIAL FUTURE

DEVELOPMENT

CHRISTIE
AVENUE
VARIES
60’ - 0” MAX.

PROPERTY LINEPROPERTY LINE
LEVELS 1 - 3 ALLOWED
MAX. CHEMICAL DENSITY
LEVELS 4 - 6 ALLOWED

HIGH CHEMICAL DENSITY
LEVELS 7 - 14 ALLOWED

ONLY MEDIUM CHEMICAL DENSITY

PROPERTY LINE
MIN. GREEN STREET SETBACK
15’ - 0”
MIN.

POTENTIAL FUTURE

DEVELOPMENT

PROPERTY LINE
VARIES
78’ - 0” MAX.

PARKING GARAGE FACES

MAJOR STREET CORNER
LOBBY
LEVELS 1 - 3 ALLOWED
MAX. CHEMICAL DENSITY
LEVELS 4 - 6 ALLOWED

HIGH CHEMICAL DENSITY
LEVELS 7 - 14 ALLOWED

ONLY MEDIUM CHEMICAL DENSITY

POTENTIAL FUTURE DEVELOPMENT
COMPRIMISES LEASABILITY +

VIEWS OF EASTERN TOWER

PUBLICLY

ACCESSIBLE
PLAZA

CHRISTIE
AVENUE

PUBLICLY

ACCESSIBLE

PLAZA LOBBY
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES
+
-

ALTERNATIVE A ALTERNATIVE B ALTERNATIVE C ALTERNATIVE D

MAXIMIZES FRONTAGE FOR RESIDENTIAL UNITS

OPTIMIZES TOWER SETBACK FROM CHRISTIE
AVENUE

MINIMIZES COMPROMISED EAST FACING

LABORATORY SPACE

PROVIDES BAY AND OAKLAND HILLS VIEW

OPPORTUNITIES FOR AMENITY TERRACES

INCREASES SEPARATION BETWEEN BIKES AND

CARS ON SITE

EAST FACING AREA OF LABORATORY FLOORS

HAVE COMPROMISED VIEWS

REDUCED SOLAR EXPOSURE AT AMENITY

TERRACE
+
-

MAXIMIZES TOWER SETBACK FROM CHRISTIE
AVENUE

PROVIDES GOOD AFTERNOON SOLAR ACCESS

TO COMMERCIAL AMENITY TERRACE

MAXIMIZES BAY AND SKYLINE VIEW

OPPORTUNITIES FOR AMENITY TERRACES

LIMITED FRONTAGE FOR RESIDENTIAL UNITS

LABORATORY FLOORS ARE SIGNIFICANTLY

COMPROMISED

COMMERCIAL LOBBY NOT ACCESSIBLE FROM

CHRISTIE AVENUE

PARKING GARAGE FACES PUBLIC OPEN SPACE

AND STREET CORNER

PARKING GARAGE GEOMETRY CONFLICTS WITH

SHAPE OF WESTERN SHAPE OF SITE AND FORCES

LABORATORY FLOORS TO BE LONG AND SKINNY
+
-

PROVIDES SOUTH FACING FRONTAGE FOR

RESIDENTIAL UNITS

MINIMIZES COMPROMISED EAST FACING

LABORATORY SPACE

PROVIDES BAY, SKYLINE AND OAKLAND HILLS

VIEW OPPORTUNITIES FROM AMENITY TERRACES

MAXIMIZES SOLAR ACCESS TO AMENITY

TERRACE

MAXIMIZES SEPARATION BETWEEN BIKES AND

CARS ON SITE

MINIMIZES TOWER SETBACK FROM CHRISTIE
AVENUE

PARKING GARAGE FACES PUBLIC OPEN SPACE

AND STREET CORNER

GARAGE ENTRANCE CLOSE TO STREET CORNER
+
-

PROVIDES BALANCE BETWEEN TOWER SETBACK

FROM CHRISTIE AVENUE AND EAST PROPERTY
LINE

PROVIDES AFTERNOON SOLAR ACCESS TO

COMMERCIAL AMENITY TERRACE

GROUND FLOOR OPEN SPACE SHIFTED AWAY

FROM INTERSECTION

LIMITED OPPORTUNITY FOR RESIDENTIAL UNITS

PARKING GARAGE FACES STREET CORNER AND

CHRISTIE AVENUE

MINIMIZES OPPORTUNITIES TO SEPARATE BIKES

AND CARS ON SITE

LIMITS OPPORTUNITIES FOR ACTIVE USES

FACING BIKE PATH
STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 16 Tower Location Study
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 02–04–2022 2 Local Amentities | Site design concept
Building
Art
Urban Trail
Seating Garden
Cafe/Retail
Plaza
Bike Shared Alley

3. DESIGN CONCEPT
STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 17 © 2022 SOLOMON CORDWELL BUENZ CA VENTURES

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE
bike parking +/- 3500sf
electrical transformers / gas meters / fire pumps
+/- 4,000sf
main lobby
residential
lobby
general BOH & lab support
+/- 10,875sf
water mpoe
CAFE
+/- 900SF
security
management
bike
room
studio
~450SF
1bed
~660SF
1bed
~660SF
1bed
~660SF
1bed
~660SF
1bed
~660SF
1bed
~660SF

CHRISTIE AVENUE

SHELLMOUND WAY

SHELLMOUND STREET

BOH BIKE PARKING
RESI 1BD 1BD 1BD 2BD 2BD
LOBBY
ST
BIKE
RM
BOH + LAB

SUPPORT
BOH
LOBBY

AMENITY
ST
STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 18 Plan | Proposed Ground Floor and Site Improvements
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 19

CIRCULATION AND CONNECTION MAXIMIZE OPEN SPACE OPPORTUNITIES AFFORDABLE HOUSING

BIKE PATH CONNECTION

SHELLMOUND WAY

R E S I D E N T I A L

VIEW TERRACE

P U B L I C

O P E N
SPACE
FUTURE

AFFORDABLE

HOUSING

CHRISTIE AVE
L A B O R ATO R Y +

O F F I C E T E N A N T

AMENITY TERRACE
Site & Massing | Goals & Proposed Responses
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 20 Site & Massing | Pedestrian Experience
37’ - 75’
37’-75’
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 21 Section | N-S Building Section

SHELLMOUND
WAY

PROPERTY LINEPROPERTY LINE
FUTURE

AFFORDABLE

HOUSING ON

CITY OWNED
PARCEL
MIN. PEDESTRIAN PRIORITY ZONE SETBACK

LABORATORY / OFFICE

LABORATORY / OFFICE

LABORATORY / OFFICE

MECHANICAL SPACE

LABORATORY / OFFICE

LABORATORY / OFFICE

LABORATORY / OFFICE

LABORATORY / OFFICE

LABORATORY / OFFICE

LABORATORY / OFFICE

LABORATORY / OFFICE

LABORATORY / OFFICE

LABORATORY / OFFICE

LABORATORY / OFFICE

LOBBY LOADING

TERRACE

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL
LOBBY
BIKE
PATH
20’-0”
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES

GROUND FLOOR PLAN TYPICAL

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE
15' - 0"
12' - 0" 15' - 5"
10' - 0"
7' - 0"
37' - 1"
29' - 9"
32' - 5"
26' - 3"
74' - 9"
25' - 0"

GROUND FLOOR PLAN TYPICAL LOWER PLAN

PROPERTY LINE

PROPERTY LINE

PROPERTY LINE
12' - 0" 15' - 5"
10' - 0"
29' - 9"
10' - 0"
32' - 5"
15' - 0"
26' - 3"
25' - 0"25' - 0"

BOH BIKE PARKING
RESI 1BD 1BD 1BD 2BD 2BD
LOBBY
ST 2BD 2BD 2BD 2BD 1BD 3BD
BIKE
RM
25’ - 0”
32’ - 6”
MIN.
10’ - 0”
15’ - 0”
26’ - 3”
10’ - 0”
29’ - 9”
15’ - 0”
37’ - 1”
MIN. FROM
CURB
7’ - 0”
12’ - 0”
15’ - 5”
74’ - 9”
MAX.
25’ - 0”
ST
STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 22 Plans | Typical

SHELLMOUND WAY

SHELLMOUND WAY BELOW

CHRISTIE AVE

CHRISTIE AVE BELOW
LABORATORY +

OFFICE SPACE
BOH + LAB

SUPPORT
BOH
LOBBY

AMENITY
LABORATORY +

OFFICE PARKING
FLOOR PLAN - GROUND FLOOR FLOOR PLAN - TYPICAL FLOOR 2-4 © 2022 SOLOMON CORDWELL BUENZ CA VENTURES

TOP RESIDENTIAL PLAN UPPER
2BD 2BD 3BD
RESI

TERRACE

TOP RESIDENTIAL PLAN UPPER TOWER PLAN

SHELLMOUND WAY BELOW

CHRISTIE AVE BELOW
LABORATORY +

OFFICE SPACE
FLOOR PLAN - LEVEL 6 TERRACE
3BD

SHELLMOUND WAY BELOW

CHRISTIE AVE BELOW
ST
STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 23 Plans | Typical
LABORATORY + OFFICE TENANT

AMENITY TERRACE

RESIDENTIAL

ROOF BELOW
LABORATORY +

OFFICE SPACE
LABORATORY +

OFFICE PARKING
FLOOR PLAN - LEVEL 5
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 24 View | South Elevation
+ 240’ - 0”

T/ ROOF
+ 27’ - 0”
+ 265’ - 0”
T/ LEVEL 2

T/ FACADE SCREEN

CHRISTIE
AVENUE

PROPERTY LINE

PROPERTY LINE

ADJACENT

PROPERTY
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 25 View | West Elevation
+ 240’ - 0”

T/ ROOF
+ 265’ - 0”

T/ FACADE SCREEN

PROPERTY LINE

PROPERTY LINE
BIKE
LANE

FUTURE AFFORDABLE

HOUSING ON CITY

OWNED PARCEL
+ 75’ - 0”

T/ TERRACE

SHELLMOUND
WAY
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 26 View | North Elevation
+ 75’ - 0”

T/ TERRACE

BIKE LANE

ADJACENT

PROPERTY

CHRISTIE
AVENUE
+ 240’ - 0”

T/ ROOF
+ 265’ - 0”

T/ FACADE SCREEN

PROPERTY LINE

PROPERTY LINE
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 27 View | East Elevation
+ 75’ - 0”

T/ TERRACE
BIKE
LANE

FUTURE AFFORDABLE

HOUSING ON CITY

OWNED PARCEL

SHELLMOUND
WAY

PROPERTY LINE

PROPERTY LINE
+ 240’ - 0”

T/ ROOF
+ 265’ - 0”

T/ FACADE SCREEN
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 28

PROPOSED PROJECT AREA SUMMARY
TOTAL SITE AREA: 64,682 sqft
MAX FAR AREA: 388,090 sqft

COMMUNITY OFFICE / NON-RES LOADING MAJOR OPEN SPACE RESIDENTIAL RESIDENTIAL AMENITY LABORATORY FLOOR AREA (1) M/E/P (2) NON-RESE (4) OPEN SPACE (5) FLOOR AREA (1) units/flr studios 1bd 2bd 3bd

GSF GSF GFA SPACES GSF GSF GSF SF SF GFA
HT
+240.00 Roof 6,000
+223.00 14 28,150 28,150
+206.75 13 28,150 28,150
+190.50 12 28,150 28,150
+174.25 11 28,150 28,150
+158.00 10 28,150 28,150
+141.75 9 28,150 28,150
+125.50 8 28,150 28,150
+109.25 7 28,150 28,150
+93.00 6 28,150 28,150
+75.00 5 28,150 28,150 10,625
+56.00 4 17,750 17,750 40 13,900
55 20,825 1,150 6230 5 1022
+38.00 3 17,750 17,750 55 20,825 200 6845 6 0141
55 20,825 200 6845 6 0141
+20.00 2 17,750 17,750 55 20,825 200 6845 6 0141
+20.0 55 20,825
+0.00 G 1,000 18,790 19,790 0 6,550 3,600 5,850 16,805 . 1,000 353,540 354,540 315 124,575 3,600 11,850 27,430 1,990 33,550 30 3 6 16 5 GSF GSF GFA SPACES GSF GSF GSF SF SF GFA units studios 1bd 2bd 3bd

10.0% 20.0% 53.3% 16.7%
NON-RES FLOOR AREA: 354,540 sqft
RESIDENTIAL FLOOR AREA: 33,550 sqft
TOTAL FLOOR AREA: 388,090 sqft
NOTES 1. CALCULATIONS ARE BASED ON CONCEPTUAL DIAGRAMS AND ARE ESTIMATED PER PLANNING DEPARTMENT DEFINITIONS OF AREA

2. CONCEPTUAL DIAGRAMS DO NOT REFLECT INPUT FROM ENGINEERING OR OTHER DESIGN DISCIPLINES AND ARE SUBJECT TO CHANGE

3. PARKING DEMAND CALCULATION IS BASED ON THE FOLLOWING:
a. 294,000 sqft office & lab space - 1500 = 292,500 sqft total occupiable area b. 50% office use @1.2 cars per 1000sf = 176 cars
c. 50% laboratory use @ 0.75 cars per 1000sf = 110 cars d. 1000 sqft retail - 1500 @ 4.0 cars per 1000sf = 0 cars e. Total parking demand of 286 spaces + 10% = 315 allowed

4. OPEN SPACE CALCULATION IS BASED ON THE FOLLOWING:
a. 5% total gross non-residential building area required per base Planning Code = 17,727 sqft b. 15% site area required for 50 Bonus Points = 9,702 sqft c. Total non-residential open space required for project with 50 Bonus Points = 27,429 sqft

5. RESIDENTIAL TOWNHOUSES
a. Residential mix to include 63% family friendly 2bd units b. 950 sqft amenity terrace at top level of Residential buildng provides common space for residents c. Private open space for units provided by ground floor front porch stoops and balconies at upper floors d. 26 residences have access to private open space and 4 have access to common open space only 02 PARKING (3)
240 6785 7 2 3
Copyright Solom
Building Area Summary
© 2022 SOLOMON CORDWELL BUENZ CA VENTURES STUDY SESSION | 5850 SHELLMOUND WAY | EMERYVILLE, CA | 10–27–2022 29

4. FINANCIAL FEASIBILITY UPDATE
•••
••
•
•••
3 0
3 1
3 2
3 3

THANK YOU

← All documents from this meeting