C A L I F O R N I A

C O N S T R U C T I O N C O N T R A C T

F O R C I T Y U S E O N L Y
Contract No. CIP No.

Resolution No. Project No.

REV 07/2022
THIS CONSTRUCTION CONTRACT (“Contract”) is effective as of _______________ (the “Effective Date”), by and between THE CITY OF EMERYVILLE, a municipal corporation, (“City”) and EURO STYLE MANAGEMENT (“Contractor”), individually referred to as a “Party” and collectively as the “Parties”.

W I T N E S S E T H T H A T
WHEREAS, by Resolution No. __________, the City Council of the City of Emeryville has authorized the Director of Public Works to solicit public bids for The 40th Street Bridge Railing and Lumec Pole Painting Project, Project No. EPW-20103, CIP No. 15475015; and
WHEREAS, the City has conducted a public bidding procedure in compliance with all applicable laws; and
WHEREAS, Contractor submitted the lowest responsible bid; and WHEREAS, the City has determined that the Contractor is qualified by training and experience to render such services; and
NOW, THEREFORE, the Parties hereto do mutually agree as follows:

1. CONTRACT DOCUMENTS
The following documents, including their respective exhibits and addenda (collectively "Contract Documents"), are by this reference incorporated in and made a part of this Contract in the following order of precedence:
▪ Construction Contract
o Exhibit A –
1) Exhibit A(1) – Addenda to Project Specifications (if applicable) 2) Exhibit A(2) – Project Specifications
3) Exhibit A(3) – Addenda to Project Plans (if applicable) 4) Exhibit A(4) – Project Plans
5) Contractor’s Bid and Proposal (as accepted by City)
o Exhibit B – Contract Insurance Requirements
o Exhibit C – City Supplemental Terms and Conditions
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E City of Emeryville | Construction Contract
REV 07/2022

Page 2 of 5 ends

▪ Attachment A – City of Emeryville Standard Specifications (online only) o http://www.ci.emeryville.ca.us/132/City-Standards
o http://www.ci.emeryville.ca.us/348/City-Standard-Specifications ▪ Attachment B – State of California Department of Transportation Standard Plans (online only)
http://dot.ca.gov/programs/design/ccs-standard-plans-and-standardspecifications ▪ Attachment C – State of California Department of Transportation Standard Specifications (online only)
http://dot.ca.gov/programs/design/ccs-standard-plans-and-standardspecifications Any and all future amendments to this Contract will be incorporated as Construction Contract Amendments as needed.

2. SCOPE OF WORK
In conformance with the Contract Documents, Contractor will furnish, all labor, materials, equipment, incidentals, transportation, and disposal for services required in order to perform and complete the Project.

3. PRICE
The total amount to be paid under this Contract for all of the work set forth in Section 2 above is exceed ONE MILLION, SIX HUNDRED FIFTY EIGHT THOUSAND, EIGHT HUNDRED SEVENTY EIGHT DOLLARS AND NO CENTS ($1,658,878.00) ("Total Contract Price"). This price includes all costs for labor, materials, tools, equipment, services, warranty, taxes, insurance, overhead, profit and all other costs necessary to perform the work in accordance with this Contract.

4. TIME FOR COMPLETION
After the Contract has been executed by City, Contractor shall begin work within seven (7) calendar days after the effective date of the Notice to Proceed issued by City and shall diligently prosecute the work to completion within two hundred twenty five (225) working days from the effective date of the Notice to Proceed. Liquidated Damages in the Amount of $1,500 per calendar day will be assessed for failure to complete the contract work within the number of workdays specified.

5. INDEMNIFICATION
To the fullest extent permitted by law, Contractor shall indemnify, defend, and hold harmless City and City’s members, officers, agents, employees and volunteers, from and against any and all claims, losses, liabilities of every kind, nature and description, DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E City of Emeryville | Construction Contract
REV 07/2022

Page 3 of 5 ends

damages, injury (including without limitation injury to or death of an employee of Contractor or subcontractors as well as any claim by any employee, agent, Contractor or independent contractor hired or employed by Contractor that such persons or individuals are entitled to any benefit otherwise provided to employees of the City, including coverage under the California Public Employee Retirement System), costs and expenses of any kind, whether actual, alleged or threatened, including, without limitation, incidental and consequential damages, court costs, reasonable attorneys’ fees, litigation expenses, and fees of expert contractors or expert witnesses incurred in connection therewith and the costs of investigation, arising out of, pertaining to, or relating to, directly or indirectly, in whole or in part, the negligence, recklessness, or willful misconduct of Contractor, any subcontractor, anyone directly or indirectly employed by them or anyone that they control. This indemnification obligation is not limited in any way by any limitation on the amount or type of damages or compensation payable to or for Contractor. This obligation to indemnify and defend the City, its members, officers, agents, employees and volunteers shall survive termination of this Contract. Notwithstanding the foregoing, to the extent required by Civil Code section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the City or the City’s agents, servants, or independent contractors who are directly responsible to the City, or for defects in design furnished by those persons

6. INSURANCE
Contractor shall not commence Services under this Contract until it has provided evidence satisfactory to the City that it has secured all insurance required under Exhibit B, attached hereto and incorporated herein by this reference. In addition, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the City that the subcontractor has secured all insurance required under Exhibit B. Failure to provide and maintain all required insurance shall be grounds for the City to terminate this Contract for cause.

7. NO WAIVER
Failure of City to insist upon strict performance of any of the terms and conditions hereof, or failure or delay to exercise any rights or remedies or to properly notify Contractor in the event of breach, or the acceptance of or payment for any good hereunder, shall not release Contractor of any of the warranties or obligations of this Contract and shall not be deemed a waiver of any right of City to insist upon strict performance hereof.

8. NOTICES
Any notice required to be given by this Contract will be in writing and deemed effective upon personal delivery, or 1 business day after being sent via registered or certified mail return receipt requested or by overnight commercial courier providing next business day delivery and addressed to the following respective parties:

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E City of Emeryville | Construction Contract
REV 07/2022

Page 4 of 5 ends

CITY CONTRACTOR
Mohamed Alaoui, Public Works Director
1333 Park Avenue
Emeryville, California 94608
Phone No: 510-596-4330
E-Mail : [email protected]
with a copy to:

Ryan O’Connell, Senior Civil Engineer
1333 Park Avenue
Emeryville, California 94608
Phone No: 510-596-4346
E-Mail : [email protected]
Lilia Bugoyev, CFO
1401 Main Avenue
Sacramento, CA 95838
Phone No: 916-331-4858
E-Mail : [email protected]

9. ENTIRE CONTRACT
This Contract contains the entire agreement of the parties with respect to the subject matter of this Contract. Any modifications to this Contract shall be in writing.

10. AUTHORITY TO CONTRACT
Contractor covenants and declares that it has obtained all necessary approvals to bind Contractor to this Contract and that the representative signing the Contract is authorized to do so.

SIGNATURES ON FOLLOWING PAGE
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E City of Emeryville | Construction Contract
REV 07/2022

Page 5 of 5 ends

11. SIGNATURE PAGE TO CONSTRUCTION CONTRACT
IN WITNESS WHEREOF the City and the Contractor have executed this Contract, which shall become effective as of the date first written above.

Approved As To Form:

City Attorney
Dated: CITY OF EMERYVILLE
City Manager
Dated: EURO STYLE MANAGEMENT
(Signature)
Lilia Bugayev, CFO
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E 01/10/2023

SPECIFICATIONS
For
40TH STREET BRIDGE RAILING AND

LUMEC LIGHT POLE PAINTING PROJECT
PROJECT NO. EPW-20103
Issued for Bidding:

October 26, 2022
Bids Open:

November 17, 2022 at 2:00PM
For Use with the Following:

1. The State of California Department of Transportation Standard Specifications, dated 2015

2. The State of California Department of Transportation Standard Plans, dated 2015

3. Americans with Disabilities Act Standards for Accessible Design including Title II regs at 28 CFR 35.151 and 36CFR Part 1191, Appendices B & D

PUBLIC WORKS DEPARTMENT

ENGINEERING DIVISION
1333 Park Avenue, Emeryville, CA 94608
Tel. (510) 596-4330
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

TABLE OF CONTENTS

NOTICE INVITING BIDS

PART A BID DOCUMENTS

SECTION TITLE
1 BIDDER’S CHECKLIST .............................................. A-1 2 BLANK - NOT USED................................................... A-3 3 PROPOSAL.............................................................. A-4 4 BIDDER’S BOND........................................................ A-10 5 NON-COLLUSION DECLARATION ............................... A-12 6 SUBCONTRACTORS LIST ........................................... A-13 7 WORKERS COMPENSATION CERTIFICATE ................... A-16 8 CONTRACT ................................................................ A-17 • Sample Contract
• Performance Bond
• Payment Bond
• Guarantee

PART B GENERAL PROVISIONS

SECTION TITLE
1 GENERAL ......................................................................... B-2 2 BIDDING......................................................................... B-5 3 CONTRACT AWARD AND EXECUTION ................................ B-10 4 SCOPE OF WORK.............................................................. B-12 5 CONTROL OF WORK ......................................................... B-15 6 CONTROL OF MATERIALS ......................................... B-25 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC B-26 8 PROSECUTION AND PROGRESS ............................................................. B-42 9 PAYMENT ........................................................................ B-46

PART C SPECIAL PROVISIONS

PART D EXHIBITS
Exhibit D1: 40th Street Bridge Railing Painting: Limits of Work and Notes (Sheets 1-3) Exhibit D2: Lumec Light Pole Painting Locations (Sheets 1-17) Exhibit D3: Lumec Light Pole Details (Sheets 1-18)
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN THAT sealed bids will be received by the City of Emeryville, Alameda County, California, (hereinafter "City") at the Office of the Director of Public Works, 1333 Park Avenue, Emeryville, CA 94608, until 2:00 PM, November 17, 2022, at which time bids will be publicly opened for the following project:
40TH STREET BRIDGE RAILING AND LUMEC

LIGHT POLE PAINTING PROEJCT
PROJECT NO. EPW-20103
This project generally includes, but is not limited to, the preparation and painting of the following metal surfaces within the City of Emeryville:
• the 40th Street Bridge Railing,
• Approximately fifty-three (53) Lumec lights along or immediately west of Shellmound Street, and • Alternative Bid items, which may or may not be included in the project, consist of painting up to a total of 441 Lumec light pole paint at various locations throughout town.

The work, to be completed within 80 working days, is more fully described in the Contract Documents, as defined in the Contract provided in Section 8, Part A, Bid Documents. Additional working days will be provided if Alternate Bid Items are selected to be included in the Contract, as specified in Part C, Special Provisions. The engineer’s estimate for this project is $1,870,000 and is based upon the Total of the Base Bid Items ($835,000) plus Alternate Bid Items ($1,035,000). Liquidated Damages in the Amount of $1,500 per calendar day will be assessed for failure to complete the contract work within the number of workdays specified.

Bidders and their proposed subcontractors shall hold such licenses as may be required by the laws of the State of California for the performance of the work specified in the Contract Documents. Bidders bidding as the prime Contractor shall possess a valid California State Contractor’s License, Classification A – General Engineering, or Classification C33 – Painting and Decorating at the time of contract award and throughout the Contract term. The Contractor will also be required to ensure that all subcontractors working on the project are holding valid licenses suitable for their trade.

Bids shall be submitted on the forms included in Part A, Bid Documents, plainly endorsed with Bidder's name together with signed acknowledgment of any and all addenda. Bidder’s attention is directed to the Section 2, Part B, Bidding. Bid Documents shall be securely sealed in a suitable envelope marked with the name and address of the Bidder, and marked in capital letters on the front of the envelope, as follows:
40TH STREET BRIDGE RAILING AND LUMEC

LIGHT POLE PAINTING PROJECT
PROJECT NO. EPW-20103
Whether mailed or personally delivered, all bids shall be securely sealed in a suitable envelope and addressed to the City Engineer, City of Emeryville, Alameda County, California, 1333 Park Avenue, Emeryville, CA 94608. No late bids will be accepted and will be returned unopened.

Each bid must be accompanied by a Bid Guaranty in the form of Cash, Bidder's Bond, Certified Check or Cashier’s Check in an amount equal to at least ten percent (10%) of the Total Bid Price. The Bid Guaranty will be retained and applied to any and all damages sustained by the City in the event that the successful Bidder fails or refuses to enter into the Contract awarded to it or furnish all required bonds and certificates of insurance.

Plans, Specifications, Bid Documents, Supplemental Specifications and any Addendum may be obtained free of charge at www.ciplist.com.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E The Contract awarded pursuant to this advertisement is subject to the State contract nondiscrimination and compliance requirements pursuant to California Government Code §12990.

The City of Emeryville hereby notifies all Bidders that it will affirmatively ensure that in any Contract awarded pursuant to this advertisement, disadvantaged business enterprises (DBEs) will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. DBEs are strongly encouraged to submit bids as both prime Contractors and subcontractors.

This is a Public Works Contract. In accordance with section 1720 et seq. of the Labor Code, the general prevailing wage rates as established by the Director of the California Department of Industrial Relations will apply. The prevailing wage rates established by the State Director of Industrial Relations can be viewed at the City’s offices, are available on the State of California’s website at http://www.dir.ca.gov/OPRL/DPreWageDetermination.htm, or can be obtained by mail addressed to:

Prevailing Wage Unit, Division of Labor Statistics and Research, Department of Industrial Relations, P.O. Box 603, San Francisco, CA 94101.

No Contractor or subcontractor may be listed on a bid proposal or awarded a contract for a public works project unless registered with Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5 at the time of bid. Each Bidder and subcontractor must submit proof of contractor registration with DIR (e.g. a hard copy of the relevant page of the DIR's database found at: https://efiling.dir.ca.gov/PWCR/Search).

This Contract is subject to monitoring and enforcement by the DIR pursuant to Labor Code Section 1771.4.

Pursuant to Public Contract Code Section 22300, the successful Bidder may submit certain securities in lieu of the City retaining a portion of progress payments during the Project. Pursuant to California Civil Code Section 9950, the successful Bidder at the time the contract is awarded shall furnish a payment bond if civil work exceeds twenty-five thousand dollars ($25,000) in the amount of 100% of the Total Contract Price. The successful Bidder shall also provide a performance bond in the amount of 100% of the Total Contract Price.

Attention is directed to the Contract Documents for complete details and bid requirements. Said Contract Documents shall be considered as a part of any Contract awarded pursuant to this Notice Inviting Bids.

All bids are to be compared on the basis of the City Engineer's estimate of the quantities of work to be done. The lowest bid shall be the lowest bid price on the base contract bid items, without consideration of the prices on the additive or deductive alternative bid items. The City of Emeryville reserves the right to reject any or all bids, and further reserves the right to waive formal irregularities as to any bid substantially in conformity with the specifications herein referred to. The City of Emeryville reserves the right to reject any and all bids or to waive any defects or irregularity in bidding in accordance with applicable law. In accordance with California Public Contract Code Section 20103.8, if the City elects to award a contract for performance of the project, the contract will be awarded in accordance with California Public Contract Code Section 20162 and other applicable law to the responsible bidder submitting a responsive bid with the lowest total bid price. All bids will remain valid for 90 days after the bid opening. Except as permitted by law and subject to all applicable remedies, including forfeiture of bidder’s security, bidders may not withdraw their bid during the 90-day period after the bid opening.

The firm of Coastland Engineering has provided engineering services to the City for this project.

Therefore, this firms, and any of their affiliates, partners, officers, employees, parent companies or subsidiaries are prohibited from being awarded the Contract for the project, subcontracting for a portion of the work under the Contract for the project, or supplying materials for the work under the Contract for the project. Accordingly, these persons and entities are ineligible to bid on the project and no Contract shall be awarded to such persons or entities identified as the Contractor, subcontractor or supplier on a submitted bid proposal for this Project.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E All questions prior to award of the Contract shall be directed to the Project Manager Ryan O’Connell [email protected]. The deadline for submissions of initial questions and clarifications concerning the Contract Documents is November 8, 2022, at 5:00pm. Only signed Addenda issued by the City Engineer or Project Engineer are binding. The City of Emeryville hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. DBEs are strongly encouraged to submit bids as both primes and subs.

By order of the City Council of the City of Emeryville, Alameda County, California, December 12, 2021 and March 1, 2022.

Date: 10/26/2022
Ryan O’Connell, PE
Senior Civil Engineer, City of Emeryville
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E PART A

BID DOCUMENTS
• 40TH STREET BRIDGE RAILING AND LUMEC LIGHT

POLE PAINTING PROJECT
PROJECT NO. EPW-20103
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E SECTION 1
BIDDER’S CHECKLIST
All items on the Bidder’s Checklist should be checked next to each item and must be initialed and dated at the bottom for the Proposal to be considered complete. The City of Emeryville reserves the right to award a Contract in a manner and on the basis which will best serve the City.

The Bidders’ attention is specifically called to the following forms which must be executed in full as required:

1. (a) Bid Sheets □
The Base Bid Price, Add Alternate Price and Total Bid Price must be shown in the space on the Bid Proposal form provided.
(b) Bid Proposal Form □
A Bid Proposal form must be filled in, signed and submitted for the Bid Documents to be considered complete.

2. Bidder’s Bond (Accompanying Bid) □
If not otherwise providing cash, cashier’s check or certified check with its Bid Proposal as its bid guaranty, a Bidder’s Bond form must be filled out, signed, and submitted with the Bid Proposal for the Bid Documents to be considered complete. The surety’s power of attorney must be attached. Original signatures are required.

3. Non-Collusion Declaration □
A Non-Collusion Declaration form must be filled out, signed, and submitted with the Bid Proposal for the Bid Documents to be considered complete.

4. Subcontractors List □
A Subcontractors List form must be filled out and submitted with the Bid Proposal for the Bid Documents to be considered complete.

5. Workers Compensation Certificate □
The Bidder acknowledges that he/she must sign and attach any applicable Workers Compensation Certificate to the Bid Proposal.

6. Waste Management Plan □
Applicant is notified of need to prepare a Waste Management Plan as a project submittal.

On-line system is available at www.emeryville.wastetracking.com/# Check here signifies awareness of and intent to prepare, if awarded a contract.

7. Bond Requirements □
The Bidder understands that a performance bond issued by an approved surety equaling one hundred percent (100%) of the Total Contract Price amount will be required. A payment bond equaling one hundred percent (100%) of the Total Contract Price amount will also be required.

EPW-20103 A-1
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

8. Addenda □
The Bidder acknowledges that he/she must sign and attach any applicable addenda to the Bid Proposal for the Bid Documents to be considered complete.

Initial: Date:

EPW-20103 A-2
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E SECTION 2
Not Used
EPW-20103 A-3
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E SECTION 3

PROPOSAL
To the Honorable City Council of the City of Emeryville, Alameda County, California.

PROJECTS:
40TH STREET BRIDGE RAILING PAINTING

LUMEC LIGHT POLE PAINTING PROJECT
PROJECT NO. EPW-20103
Name of Bidder
Street Address
City, State, Zip Code
Telephone No.

Email Address
FOR USE WITH THE FOLLOWING:

1. The State of California Department of Transportation Standard Specifications, 2015, and the State of California Department of Transportation Standard Plans, 2015.

The Contract Drawings are generally titled 40TH STREET BRIDGE RAILING PAINTING, LUMEC LIGHT POLE PAINTING PROJECT, PROJECT NO. EPW-20103.

Bids are to be submitted for the entire work. The amount of the bid for comparison purposes will be the total of all BASE BID ITEMS.

With regards to the BASE BID ITEMS, the Bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for that purpose. In the case of unit basis items, the amount set forth under the "Item Total" column shall be the product of the unit price bid and the estimated quantity for the item.

In case of discrepancy between item price and the total set forth for the item, the item price shall prevail, provided, however, if the amount set forth as an item price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or in the case of unit basis items, is the same amount as the entry in the "Item Total" column, then the amount set forth in the "Item Total" column for the item shall prevail in accordance with the following:

EPW-20103 A-4
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E PROPOSAL (CONT.) Project No. EPW-20103
(1) As to lump sum items, the amount set forth in the "Item Total" column shall be the item price. (2) As the unit basis items, the amount set forth in the "Item Total" column shall be divided by the estimated quantity for the item and the price thus obtained shall be the item price.

With regards to the ALTERNATIVE BID ITEMS:

The Alternate Bid Items listed on the following pages identify potential changes in the Work under consideration for this Contract. The Owner reserves the right to accept any or all of the listed Alternates, regardless of the order of their listing.

For each of the Alternates listed, state the unit price if the individual Alternate is selected for inclusion in the Contract scope. Amount shown shall include all costs to perform the Work; no extras will be permitted for failure to include, but not limited to, such items as: extra permits, overtime, weather protection, materials, labor, supervision, general conditions, overhead, and profit for general contractor and/or subcontractors, shoring, and other related items.

C Alternates may be accepted by Owner after initial award. Contractor shall hold prices stated below for possible incorporation into the Project at a later date during construction as determined by the Owner. Alternate Work must be accepted in writing by the Owner prior to beginning any Work
If this proposal shall be accepted and the undersigned shall fail to enter into the Contract and furnish the two (2) bonds in the sums to be determined as aforesaid with surety satisfactory to the Department of Public Works and provide the appropriate insurance certificates within ten (10) calendar days after the Bidder has received notice from the City Engineer that the Contract has been awarded, the City may, at its option, determine that the Bidder has abandoned the Contract, and thereupon this proposal and the acceptance thereof shall be null and void and the forfeiture of such security accompanying this proposal shall operate and the same shall be the property of the City of Emeryville. If the deadline to perform any act shall fall on a Saturday, Sunday or legal holiday of the City, then the deadline to perform said act shall fall on the next regular business day.

The undersigned, as Bidder, declares that the only persons or parties interested in this proposal as principals are those named herein; that this proposal is made without collusion with any other person, firms, or corporation and in submitting this proposal, the undersigned Bidder agrees that he has carefully examined the location of the proposed work, the annexed proposed form of Contract, and the plans and specifications therein referred to; and he proposes, and agrees if this proposal is accepted, that he will contract with the City of Emeryville in the form of a copy of the Contract annexed hereto to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the Contract, in the manner and time therein prescribed, and according to the requirements of the City Engineer as therein set forth, and that he will take in full payment therefore the following item prices to wit:

EPW-20103 A-5
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

BID SHEET
Project No. EPW‐20103 Contractor:
40TH STREET BRIDGE RAILING PAINTING AND LUMEC

LIGHT POLE PAINTING PROJECT
EMERYVILLE, CALIFORNIA Date:

Plan Exhibits D1, D2, D3 EPW‐20103 Nos.:

Amount rounded to Nearest:
$.01
No. CONTRACT BID ITEMS Quantity Unit Unit Price Total

INCIDENTAL ITEMS
Note: The Contract lump sum or unit price for each Contract Bid Item shall include full compensation for all labor, materials, tools, taxes, profit, overhead, incidentals and appurtenant work necessary for performing and completing the work of the Contract Bid Item as required by the Project Plans, Specifications, Special Provisions and other Contract Documents. Such
compensation shall also include or take into consideration any additional provisions or conditions specifically stated immediately following the Contract Bid Item.
….. ….. N/A N/A
Note: In the absence of a specific bid item or specific payment provisions for any portion of the work required by the Contract Documents, the bidder shall include the bidder’s compensation for that portion of the Contract work in the Contract unit price(s) and/or lump sum price(s) of the bid item(s) that require such work, or are closely related to such work. Therefore, no separate or additional payment will be made to the Contractor for any such work on the premise that such work lacks specific bid item(s) or specific payment provisions.
….. ….. N/A N/A

BASE BID ITEMS
1 Supplemental Work 1 LS $90,000.00 $90,000.00
2 Mobilization (10% max. of Base Bid Sheet Items) 1 LS
3 Traffic Control System: 40th Street Bridge Railing Painting 1 LS 4 Traffic Control System: Lumec Light Pole Painting 1 LS 5 40th Street Bridge Railing Painting 1,986 LF
6 Lumec Light Pole with Double Fixture Painting 49 EA
7 Lumec Light Pole with Double Fixture on Pole with traffic signal equipment
3 EA

TOTAL BASE BID

ALTERNATIVE BID ITEMS
A1 Lumec Light Pole Replacement Parts 1 LS
A2 Locations included on Exhibit D2 Sheets 3, 4, 5, 6 & 8 of 17 A2.1 Single Fixture on pole with banner arms 7 EA
A2.2 Double Fixture 39 EA
A2.3 Double Fixture on Pole with traffic signal equipment 1 EA

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E A3 Locations included on Exhibit D2 Sheets 7 & 9 of 17
A3.1 Single Fixture on pole with banner arms 87 EA
A3.2 Double Fixture 11 EA
A4 Locations included on Exhibit D2 Sheets 7 & 9 of 17
A4.1 Single Fixture on pole with banner arms 53 EA
A5 Locations included on Exhibit D2 Sheets 10, 11 & 14 of 17 A5.1 Single Fixture 33 EA
A5.2 Double Fixture 38 EA
A6 Locations included on Exhibit D2 Sheets 16 & 17 of 17 A6.1 Single Fixture 16 EA
A6.2 Double Fixture 46 EA
A7 Locations included on Exhibit D2 Sheets 13, 14, 15 & 16 of 17 A7.1 Double Fixture 47 EA
A8 Locations included on Exhibit D2 Sheets 12, 13 & 16 of 17 A8.1 Single Fixture 14 EA
A8.2 Single Fixture on pole with banner arms 12 EA
A8.3 Double Fixture 2 EA
A9 Locations included on Exhibit D2 Sheets 13 & 14 of 17 A9.1 Single Fixture 9 EA
A9.2 Double Fixture 21 EA

TOTAL ALTERNATIVE BID ITEMS
TOTAL BASE BID + ALTERNATIVE BID ITEMS
Bidder:

Authorized Signature / Title
EPW-20103 A-7
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E PROPOSAL (CONT.) Project No. EPW-20103
Accompanying this proposal is
(Notice: insert the words CASH ($), CASHIER'S CHECK, CERTIFIED CHECK, OR BIDDERS BOND) in an amount equal to at least ten percent of the total of the Total Bid Price.

The names of all persons interested in the foregoing proposal as principals are as follows:

IMPORTANT NOTICE: If Bidder or other interested person is a corporation, state legal name of corporation, also names of the president, secretary, treasurer, and manager thereof; if a co-partnership, state true name of firm, also names of all individual copartners composing firm; if Bidder or other interested person is an individual, state first and last names in full.

Licensed in accordance with an act providing for the registration of Contractors:

Contractor: License No.

Licensee Name
License Qualifier
Date Issued
Other License Classifications Hazardous Substances Removal: License No.

Licensee Name (May be Subcontractor)
License Qualifier
Date Issued
DIR Registration Number
EPW-20103 A-8
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E PROPOSAL (CONT.) Project No. EPW-20103
ADDENDA This Proposal is submitted with respect to the changes to the contract included in addenda numbers (Fill in any addenda numbers if addenda have been received.)
By my signature on this proposal, I certify, under penalty of perjury, under the laws of the State of California, that the foregoing questionnaire and statements of Public Contract Code Section 10162, 10232 and 10285.1 are true and correct and that the Bidder has complied with the requirements of Section 8103 of the Fair Employment and Housing Commission Regulations (Chapter 5, Title 2 of the California Administrative Code). By my signature on this proposal, I further certify, under penalty of perjury, under the laws of the State of California, that the Non-Collusion Affidavit required by Public Contract Code Section 7106 is true and correct.

SIGN HERE>>> by:
its:

Date:

END OF PROPOSAL
EPW-20103 A-9
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E SECTION 4

BIDDER'S BOND
KNOW ALL PERSONS BY THESE PRESENTS:

That , as Principal, and , as Surety, are
held and firmly bound unto the City of Emeryville, a municipal corporation located in Alameda County, State of California (hereinafter "City"), in the sum of ($) , being at least ten percent (10%) of the total amount of the Grand Total Bid Price, for the payment of which sum in lawful money of the United States of America to the City of Emeryville we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the Principal has submitted said bid to the City for the 40TH STREET BRIDGE RAILING PAINTING, LUMEC LIGHT POLE PAINTING PROJECT, PROJECT NO. EPW-20103. ("Project");
NOW, THEREFORE, the condition of the above obligation is such that if a Contract is awarded by the City within the time and in the manner required by the specifications for the Project, and a written Contract is entered into with the City and the requisite bond or bonds and insurance certificates are furnished, then this obligation shall become null and void, otherwise to remain in full force and effect for ninety (90) days following the public opening of bids for this solicitation.

In the event suit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all costs incurred by the City in such suit, including a reasonable attorneys fee to be fixed by the Court.

Dated , 20 .

TO BE CONSIDERED COMPLETE,
BOTH THE PRINCIPAL AND Principal

SURETY MUST SIGN THIS
BIDDER'S BOND. IN ADDITION, By:

THE SURETY'S SIGNATURE MUST

BE NOTARIZED AND
THE SURETY'S POWER OF ATTORNEY Surety
MUST BE ATTACHED. ORIGINAL
SIGNATURES ARE REQUIRED By:

Address of Surety
EPW-20103 A-10
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

CERTIFICATE OF ACKNOWLEDGMENT

STATE OF CALIFORNIA

COUNTY OF ALAMEDA
On , 20
ss
before me, ,
Notary Public, personally appeared
, who proved to me
on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature: (Seal Above)

END OF BIDDERS BOND
EPW-20103 A-11
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E SECTION 5

NON-COLLUSION DECLARATION
The undersigned declares:

I am the of , the party making
the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

The undersigned declares under penalty of perjury that the information contained in this proposal and all accompanying documents are true and correct.

Executed on
Legal Company Name
By:

Title:

Date:

EPW-20103 A-12
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E SECTION 6

SUBCONTRACTORS LIST
In accordance with Section 2-1.10 “Subcontractors List" of the Standard Specifications for this Contract, the following list of Subcontractors is submitted with the Proposal and made a part thereof. (Use multiple sections for same subcontractor if all of their line items do not fit under one section.)

1. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No.

Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

2. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No.

Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

3. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No.

Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item
EPW-20103 A-14
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

4. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No.

Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

5. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No.

Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

6. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No.

Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

7. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No.

Address
EPW-20103 A-15
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

8. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No.

Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

9. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No.

Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item

10. Name of Subcontractor/Supplier
License No.

Dept. of Industrial Relations Registration No.

Address
Work to be Performed
Bid Sheet Item No.(s)
Percentage of each Item No. to be Performed
Dollar Value of each Work Item
EPW-20103 A-16
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E SECTION 7
WORKERS’ COMPENSATION CERTIFICATE
To be executed by Bidder and submitted with bid
By signing below, Bidder is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers’ compensation or to undertake selfinsurance in accordance with the provision of that code, and if awarded a Contract, Bidder will comply with such provisions before commencing the performance of the work of this Contract.

Firm Name _
Signature of Authorized Official
Printed Name of Authorized Official
Title of Authorized Official _
Date
EPW-20103 A-17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E SECTION 8

CONTRACT
EPW-20103 A-18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

SAMPLE CONSTRUCTION CONTRACT
This Contract is made and entered into this day of , 202 , by and between CITY OF EMERYVILLE, a municipal corporation ("City") and ("Contractor").

W I T N E S S E T H:

WHEREAS, by Resolution No. , the City Council of the City of Emeryville has authorized the Director of Public Works to solicit public bids for , (the “Project”); and
WHEREAS, the City has conducted a public bidding procedure in compliance with all applicable laws; and
WHEREAS, Contractor submitted the lowest responsible bid; and WHEREAS, the City has determined that the Contractor is qualified by training and experience to render such services; and
NOW, THEREFORE, the parties mutually agree as follows:

1. Contract Documents
The following documents, including their respective exhibits and addenda (collectively "Contract Documents"), are by this reference incorporated in and made a part of this Contract in the following order of precedence:
a. Amendments to this Contract
b. Contract
c. Addenda to Invitation for Bid
d. Supplemental Specifications
e. Instructions to Bidders
f. City of Emeryville Standard Specifications
g. State of California Department of Transportation Standard Plans (2015) h. State of California Department of Transportation Standard Specifications (2015) i. Project Plans, Specifications, and Contract Drawings for j. Required bond documents
k. Notice to Contractors
l. Contractor's Bid and Proposal, as accepted by City
J. Exhibit A: [Reserved]
K. Exhibit B: Insurance Requirements
, Project No. EPW- , CIP No.

Project No. EPW- , CIP No.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E $ per calendar day
$ ( DOLLARS)

2. Scope of Work
In conformance with the Contract Documents, Contractor will furnish, all labor, materials, equipment, incidentals, transportation and disposal for services required in order to perform and complete the Project.

3. Price
The total amount to be paid under this Contract for all of the work set forth in Section 2 above is not to exceed ("Total Contract Price"). This price includes all costs for labor, materials, tools, equipment, services, warranty, taxes, insurance, overhead, profit and all other costs necessary to perform the work in accordance with this Contract.

4. Time for Completion
After the Contract has been executed by City, Contractor shall begin work within seven (7) calendar days after the effective date of the Notice to Proceed issued by City and shall diligently prosecute the work to completion within ( ) working days from the effective date of the Notice to Proceed. Liquidated Damages in the Amount of will be assessed for failure to complete the contract work within the number of workdays specified.

5. Indemnification
To the fullest extent permitted by law, Contractor shall indemnify, defend, and hold harmless City and City’s members, officers, agents, employees and volunteers, from and against any and all claims, losses, liabilities of every kind, nature and description, damages, injury (including without limitation injury to or death of an employee of Contractor or subcontractors as well as any claim by any employee, agent, Contractor or independent contractor hired or employed by Contractor that such persons or individuals are entitled to any benefit otherwise provided to employees of the City, including coverage under the California Public Employee Retirement System), costs and expenses of any kind, whether actual, alleged or threatened, including, without limitation, incidental and consequential damages, court costs, reasonable attorneys’ fees, litigation expenses, and fees of expert contractors or expert witnesses incurred in connection therewith and the costs of investigation, arising out of, pertaining to, or relating to, directly or indirectly, in whole or in part, the negligence, recklessness, or willful misconduct of Contractor, any subcontractor, anyone directly or indirectly employed by them or anyone that they control. This indemnification obligation is not limited in any way by any limitation on the amount or type of damages or compensation payable to or for Contractor. This obligation to indemnify and defend the City, its members, officers, agents, employees and volunteers shall survive termination of this Contract. Notwithstanding the foregoing, to the extent required by Civil Code section 2782, Contractor’s indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the City or the City’s agents, servants, or independent DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E contractors who are directly responsible to the City, or for defects in design furnished by those persons

6. No Waiver
Failure of City to insist upon strict performance of any of the terms and conditions hereof, or failure or delay to exercise any rights or remedies or to properly notify Contractor in the event of breach, or the acceptance of or payment for any good hereunder, shall not release Contractor of any of the warranties or obligations of this Contract and shall not be deemed a waiver of any right of City to insist upon strict performance hereof.

7. Notices
Any notice required to be given by this Contract will be in writing and deemed effective upon personal delivery, or 1 business day after being sent via registered or certified mail return receipt requested or by overnight commercial courier providing next business day delivery and addressed to the following respective parties:

City Contractor
City of Emeryville
Attn:
1333 Park Ave
Emeryville, CA 94608

8. Entire Contract
This Contract contains the entire agreement of the parties with respect to the subject matter of this Contract. Any modifications to this Contract shall be in writing.

9. Authority to Contract
Contractor covenants and declares that it has obtained all necessary approvals to bind Contractor to this Contract and that the representative signing the Contract is authorized to do so.

IN WITNESS HEREOF, City and Contractor have caused this Contract to be executed as of the date first above written.

CITY OF EMERYVILLE
Christine Daniel, City Manager
Approved as to form:

City Attorney
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Contractor
Firm Name:

Address:

Telephone:

Fax No:

Email Address:

SIGN HERE >>> by:
its:

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E City of Emeryville
E X H I B 1 7 B
As used in this Exhibit B, Contractor refers to

1. MINIMUM REQUIREMENTS
Contactor shall, at its expense, procure and maintain for the duration of the Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work or Services required by the Contact hereunder by Contactor, its agents, representatives, employees or subcontractors. Contractor shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Contract. Such insurance shall meet at least the following minimum levels of coverage, as checked below:

4. Minimum Scope of Insurance
Coverage shall be at least as broad as the latest version of the following:

General Liability
Insurance Services Office Commercial General Liability coverage (occurrence form CG O0 O1).

Automobile Liability
Insurance Services Office Business Auto Coverage form number CA 00 01, code 1 (any auto) or if Contractor owns no vehicles, this requirement may be met through a non-owned auto endorsement to the General Liability Professional Liability / Errors and Omissions
Written on a policy form specifically designed to protect against acts. errors or omissions of the Contractor wherein “Covered Professional Services" as designated in the policy must specifically include Services performed under this Contract.

Workers’ Compensation and Employer’s Liability
Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. Policies shall not contain exclusions contrary to this Contact.

Pollution Liability Insurance
Pollution Liability insurance for claims arising from the discharge, dispersal release or escape or any irritant or contaminant into or upon land, any structure, the atmosphere, watercourse or body of water, including groundwater. This shall DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E City of Emeryville | Contract Insumnoe Requirements (Exhibit B) include on and off-site clean up and emergency response costs and claims arising from above ground and below ground storage tanks.

1. 2 Minimum Limits of Insurance
Contractor shall maintain limits no less than:

General Liability
All Contact Types
$1,000,000.00 per occurrence and $2,000,000.00 aggregate for bodily injury, personal injury and property damage, including without limitation, blanket contractual liability.

Construction Specific
$2,000,000.00 per occurrence and $4,000,000.00 aggregate for bodily injury, personal injury, and property damage, including without limitation, blanket contractual liability, and coverage for explosion, collapse, and underground property damage hazards.

Automobile Liability
$2,000,000.00 per accident for bodily injury and property damage.

Professional Liability / Errors and O missions
$2,000,000.00 per claim and aggregate.

Workers’ Compensation and Employer’s Liability
Workers’ compensation limits as required by the Labor Code of the State of California. Employer’s Liability limits of $1,000,000.00 each accident, policy limit bodily injury or disease, and each employee bodily injury or disease.

Pollution Liability Insurance
$2,000,000.00 per occurrence and $2,000,000.00 aggregate.

Except for the professional liability / errors and omissions policy, defense costs shall be available in addition to the limits. Notwithstanding the minimum limits specified herein, any available coverage shall be provided to the Parties required to be named as additional insureds pursuant to this Contract.

2. INSURANCE ENDORSEMENTS
The insurance policies shall contain the following provisions, if checked, or Contactor shall provide endorsements (amendments) on forms supplied or approved by the City to add the following provisions, if checked, to the insurance policies:

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E General Liability
(1) Such policy shall provide the City, its officials, employees, agents and authorized volunteers additional insured status using ISO endorsements CG20 10 o r CG20 37, or endorsements providing the exact same coverage, with respect to the work or operations performed by or no behalf of Contractor, including materials, parts or equipment furnished in connection with such work; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; (3) the insurance coverage shall be primary insurance as respects the City, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor's schedule underlying coverage. Any insurance or self-insurance maintained by the City, its officials, employees, agents and authorized volunteers shall be excess of Contractor's insurance and shall not be called upon to contribute with it; and (4) the insurance coverage shall contain standard separation of insureds provisions.

Automobile Liability
(1) Such policy shall provide the City, its officials, employees, agents and authorized volunteers additional insured status with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contact, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the City, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor's scheduled underlying coverage. Any insurance or self-insurance maintained by the City, its officials, employees, agents and authorized volunteers shall be excess of Contractor's insurance and shall not be called upon to contribute with it in any way.

Professional Liability Coverage
Any policy inception date, continuity date, or retroactive date must be before the effective date of this Contract and Contractor agrees to maintain continuous coverage through a period no less than three years after termination of the Contract.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Workers' Compensation and employer’s Liability Coverage The insurer shall agree to waive all rights of subrogation against the City, its officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy which rise from work performed by Contractor.

Pollution Liability Coverage
(1) Such policy shall give the City, its officials, employees, agents and authorized volunteers additional insured status with respect to claims arising from the discharge, dispersal release or escape or any irritant or contaminant into or upon land, any structure, the atmosphere, watercourse or body of water, including groundwater, (2) all policies shall waive or shall permit Contractor to waive all right of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to wave all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the City, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor’s scheduled underlying coverage. Any insurance or self-insurance maintained by the City, its officials, employees, agents and authorized volunteers shall be excess of Contractor's insurance and shall not be called upon to contribute with it in any way.

ALL COVERAGES
Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced, or canceled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its officials, employees, agents and authorized volunteers.

3. No Special Limitations
The required insurance shall not contain any special limitations on the scope of protection afforded to the City, its officials, employees, agents and authorized volunteers.

4. Deductibles and Self-Insurance Retentions
Any deductibles or self-insured retentions must be declared to and approved by the City.

Contractor shall guarantee that, at the option of the City, either: (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officials, employees, agents and authorized volunteers; or (2) the Contractor shall procure a bond or other financial guarantee acceptable to the City guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

5. ACCEPTABILITY OF INSUREERS
Insurance is to be placed with insurers with a current A.M. Best’s rating no less than A-:VII, licensed to do business in California, and satisfactory to the City. Exception may be made for the State Compensation Insurance Fund when not specifically rated.

6. VERIFICATION OF COVERAGE
Contractor shall furnish City with original Certificates of insurance and endorsements effecting coverage required by this Contract on forms satisfactory to the City. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf and shall be on forms supplied or approved by the City. All certificates and endorsements must be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance policies, at any time.

7. SUBCONTRACTORS
All subcontractors shall meet the requirements of this Section before commencing any work.

Contractor shall furnish separate certificates and endorsements for each subcontractor.

Subcontractor policies of General Liability insurance shall name the City, its officials, employees, agents and authorized volunteers as additional insureds using form ISO 20 3B 04 13 or endorsements providing the exact same coverage. AI coverages for subcontractors shall be subject to all of the requirements stated herein except as otherwise agreed to by the City in writing.

8. REPORTING OF CLAIMS
Contractor shall report to the City, in addition to Contractor's insurer, any and all insurance claims submitted by Contractor in connection with the work preformed under this Contract.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS that,
WHEREAS, the City of Emeryville, a municipal corporation located in Alameda County, State of California (hereinafter referred to as "City"), has entered into a Contract with , (hereinafter referred to as "Principal"), to construct the 40TH STREET BRIDGE RAILING PAINTING AND LUMEC LIGHT POLE PAINTING PROJECT NO. EPW-20103; and WHEREAS, the Principal is required under the terms of the Contract to furnish a bond for the faithful performance of said Contract.

NOW, THEREFORE, we, the Principal and
, as Surety, are held and firmly bound unto the City in the penal sum of ($ ), lawful money of the United States of America, being not less than one hundred percent (100%) of the Contract Amount, to be paid to the City or its successors and assigns; for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if the above-bound Principal, or its heirs, executors, administrators, successors, transferees, or assigns approved by the City, shall promptly and faithfully perform the covenants, conditions, and agreements in the Contract until completion, during the original term and any extensions thereof as may be granted by the City, with or without notice to Surety, and shall also promptly and faithfully perform all covenants, conditions, and agreements of any alteration of the Contract made as therein provided, notice of which alterations to Surety being hereby waived, provided on the Principal’s part to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City, its officers employees and agents, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

FURTHERMORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that upon Final Completion of the Contract, the above obligation shall be reduced to the amount of Dollars, ($ ), being not less than twenty percent (20%) of the Contract Amount, and shall hold for a period of two (2) years, during which time if the above bound Principal, or its heirs, executors, administrators, successors, transferees, or assigns shall fail to make full, complete and satisfactory repair and replacements or totally to protect the City from loss or damage made evident during said period from the date of Final Completion of the Contract, and resulting from or caused by defective materials or faulty workmanship in the prosecution of the work done, or failure to satisfy the warranty as set forth in the Contract, the above obligation in said sum of $ , shall remain in full force and effect, otherwise the above obligation shall be void.

Whenever Principal shall be declared by the City to be in default under the Contract, Surety shall promptly remedy the default, or shall promptly do one of the following at the City’s election:

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

1. Undertake through its agents or independent Contractors, reasonably acceptable to the City, to complete the Contract in accordance with its terms and conditions and to pay and perform all obligations of Principal under the Contract, including without limitation, all obligations with respect to warranties, guarantees, and the payment of liquidated damages.

2. Reimburse the City for all costs the City incurs in completing the Contract, and in correcting, repairing or replacing any defects in materials or workmanship and/or materials and workmanship which do not conform to the specifications in the Contract.

Further, the Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the Work to be performed thereunder or the Specifications accompanying the same shall release or exonerate the Surety on this bond or in any way affect its obligations under this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the Work, or to the Contract Documents.

The Surety’s obligations hereunder are independent of the obligations of any other surety for the performance of the Contract, and suit may be brought against the Surety and such other sureties, jointly and severally, or against any one or more of them, or against less than all of them without impairing the City’s rights against the others.

No right of action shall accrue on this bond to or for the use of any person or corporation other than the City or its successors or assigns.

In the event the City, or its successors or assigns, shall be the prevailing party in an action brought upon this bond, then in addition to the penal sum hereinabove specified, Principal and the Surety, jointly and severally, agree to pay to the City or its successors or assigns, a reasonable sum on account of its attorney’s fees incurred in such action, which sum shall be fixed by the court.

IN WITNESS WHEREOF, the above bound parties have executed this instrument under their seals this day of , 20 , the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.

Principal
Name
Title
Signature
(SEAL)
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Surety
Name
Title
Signature
(SEAL)
*Note: To be considered complete, both the Principal and an admitted Surety Insurer authorized by the California Insurance Commissioner to transact surety business in the State of California must sign the Performance Bond.

In addition, the Surety’s signature must be notarized and a copy of the Surety’s Power of Attorney DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

PAYMENT BOND
KNOW ALL PERSONS BY THESE PRESENTS, that
WHEREAS, the City of Emeryville, a municipal corporation located in Alameda County, State of California (hereinafter "City"), has awarded a contract to , (hereinafter "Principal"), to construct the 40TH STREET BRIDGE RAILING PAINTING AND LUMEC LIGHT POLE PAINTING PROJECT, PROJECT NO. EPW-20103; and WHEREAS, the Principal is required to furnish a bond in connection with the Contract, providing that if Principal, or any of it or its subcontractors, shall fail to pay for any materials, provisions, or other supplies or teams used in, upon, for or about the performance of the Work contracted to be done, for any work or labor thereon of any kind, or claims to which reference is made in Section 9554 of the Civil Code, the Surety of this bond will pay the same to the extent hereinafter set forth.

NOW, THEREFORE, we, the undersigned Principal, and ,
as Surety, are held and firmly bound unto the City in the penal sum of Dollars, ($ ), lawful money of the United
States of America, being not less than one hundred percent (100%) of the Contract Amount, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that if said Principal, or its heirs, executors, administrators, successors, transferees, assigns, or subcontractors, shall fail to pay any of the persons named in Section 9100 of the Civil Code, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under this Contract, or any amounts required to be deducted, withheld and paid over to the Employment Development Department from the wages of employees of the Contractors and his subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, the Surety will pay for the same, in an amount not exceeding the sum specified in this bond and will also pay, in case suit is brought upon this bond, a reasonable attorney's fee, to be fixed by the court.

This bond shall inure to the benefit of any and all persons named in Section 9100 of the Civil Code so as to give a right of action to them or their assigns in any suit brought upon this bond.

This bond is given to comply with Sections 9550 and 9554 of the Civil Code. The liability of the PRINCIPAL and SURETY hereunder is governed by the provisions of said Code, all acts amendatory thereof, and all other statutes referred to therein, including Section 8152 of the Civil Code.

And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract, or to the work to be performed thereunder, or the Specifications accompanying the same shall in any way affect its obligations on this bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the Work or to the Contract Documents.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their seals this day of 20 , the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

Principal
Name
Title
Signature
(SEAL)
Surety
Name
Title
Signature
(SEAL)
*Note:

To be considered complete, both the Principal and an admitted Surety Insurer authorized by the California Insurance Commissioner to transact surety business in the State of California must sign the Payment Bond. In addition, the Surety’s signature must be notarized and a copy of the Surety’s Power of Attorney must be attached.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

GUARANTEE
TO THE CITY OF EMERYVILLE for construction of the following Project:
40TH STREET BRIDGE RAILING PAINTING AND LUMEC LIGHT POLE PAINTING PROJECT, PROJECT NO. EPW-20103.

By signing below, Contractor hereby warrants and guaranties to City of Emeryville all ("City") construction performed on this Project, including all material and equipment incorporated therein, as set forth below:

1. Pursuant to this Guarantee, Contractor agrees to unconditionally guarantee 1) the quality and adequacy of all of work provided on the Project including, without limitation, all labor, materials, workmanship, methods of installation, and equipment provided by Contractor and/or its Subcontractors (of all tiers) in connection with the Work under normal application, installation, and use and service conditions (collectively "Work"); and 2) that the work is fit for the purposes intended. The Guarantee provided hereunder shall become effective on the date of Substantial Completion; or where applicable, the Guarantee shall become effective on the first day following Substantial Completion of a specifically defined phase of the Project; or on such other date as may be specified elsewhere in the Contract Documents; and once effective, the Guarantee shall remain operative and shall bind Contractor as further described herein for a period of two (2) years, or such longer period of time as may be prescribed by laws or regulations, or by the terms of Contract Documents ("Warranty Period").

This Guarantee is in addition to any warranties or guarantees required or provided by the manufacturer or supplier or otherwise provided at law with respect to Contractor’s duties, obligations and performance under the Contract Documents.

2. Neither final payment nor use or occupancy of the Work performed by the Contractor shall constitute an acceptance of Work not done in accordance with this Guarantee or relieve Contractor of liability with respect to any express warranties or responsibilities for faulty materials or workmanship. Contractor shall remedy any defects in the Work and pay for any damage resulting therefrom, which shall appear within the Warranty Period.

3. If, within the Warranty Period, the Work, or any portion thereof, is found to be defective, the City shall have the unqualified option to make any needed replacements or repairs itself or to have such replacements or repairs performed by Contractor. Such repairs or replacements shall include, without limitation, removal of any such defective Work and replacement of such Work with Work that is not defective, and satisfactory correction, or removal and replacement of any damage to other Work or the work of others resulting therefrom.

If City elects to have said repairs or replacements performed by Contractor, Contractor shall promptly, without cost to City, and in accordance with City’s written instructions, correct such defective Work. If City elects to perform the repairs or replacements, Contractor agrees to pay for all claims, costs, losses and damages caused by or resulting from such removal and replacement by City. While carrying out correction, or removal and replacement of defective or nonconforming Work the Contractor must provide the same insurance specified before Contract acceptance. Nonconforming Work that is remedied pursuant to this Warranty shall be subject to an extended warranty obligation for the period of two (2) years after the acceptance of the repairs to the nonconforming work.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

4. Inspection of the Work shall not relieve Contractor of any of its obligations under the Contract Documents. Even though Work required to be provided under the Contract Documents has been inspected, accepted, and estimated for payment, Contractor shall, at its own expense, replace or repair any such equipment, material, or Work found to be defective or otherwise not to comply with the requirements of the Contract Documents up to the end of the applicable Warranty Period.

5. This Guarantee is not in lieu of any other liability imposed on Contractor under the Contract Documents and at law with respect to Contractor’s duties, obligations, and performance under the Contract Documents, and is in addition to any warranties or guarantees required or provided by manufacturers or suppliers. In the event of any conflict or inconsistency between the terms of this Guarantee and any obligation of the Contractor under the Contract Documents or at law, such inconsistency or conflict shall be resolved in favor of the higher level of obligation of the Contractor.

6. If the Contractor fails or refuses to comply with its obligations under this Guarantee, City shall be entitled to all costs and expenses, including attorneys' fees, reasonably incurred by reason of the said failure or refusal.

Contractor Date
Contractor's Name (print)
Address
City/State/Zip
Phone
Fax No:

END OF DOCUMENT
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-1 10/26/2022
PART B

GENERAL PROVISIONS
FOR
PROJECTS:
40TH STREET BRIDGE RAILING AND

LUMEC LIGHT POLE PAINTING PROJECT
PROJECT NO. EPW-20103
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-2 10/26/2022

CITY OF EMERYVILLE

DEPARTMENT OF PUBLIC WORKS

STANDARD SPECIFICATIONS
These Standard Specifications are to be used in conjunction with the State of California, Department of Transportation Standard Specifications and Standard Plans dated 2015. In absence of revision by these Standard Specifications, comply with the State of California Department of Transportation Standard Specifications dated 2015.

DIVISION I GENERAL PROVISIONS
1 GENERAL
The Bidder's attention is directed to the provisions in Division I, Section 1, "General," of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 1, "General," of the Caltrans Standard Specifications, 2015, as follows:

SECTION 1-1.01 GENERAL
Add to 1st paragraph in Section 1-1.01 General as follows:

When counting paragraphs, individually numbered items and tables are part of the preceding paragraph.

Replace the 8th paragraph of Section 1-1.01 General with the following:

The Engineer will number bid items consecutively and uniquely for each contract.

Delete item 1 Assignments in the list in the 12th paragraph of Section 1-1.01 General.

SECTION 1-1.05 REFERENCES
Replace first sentence of the 4th paragraph of Section 1-1.05 References with the following:

Where a section number is referenced without a reference to a document, the reference is to a section of the Standard Specifications as revised by the City Standard Specifications and Special Provisions.

SECTION 1-1.07 DEFINITIONS
SECTION 1-1.07B GLOSSARY
Add to Section 1-1.07B Glossary, and where a glossary term definition already exists in the Standard Specifications, 2015, replace said term as follows:

Architect: The Engineer as defined in this section.

City: City of Emeryville

Department or Department of Transportation: The City of Emeryville.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-3 10/26/2022
Director or Director of Transportation: The City of Emeryville Public Works Director or designee.

Engineering Standards: The current City of Emeryville Engineering Standards.

Engineer: The City Engineer, City of Emeryville, acting either directly or through properly authorized agents, the agents acting within the scope of the particular duties delegated to them.

Excusable Delay: Delay caused by the City and not reasonably foreseeable when the work began such as:

1. Change in the work;

2. City action that is not part of the Contract;

3. Described facility rearrangement not rearranged as described, by the utility owner by the date specified, unless:
(i) the rearrangement is solely for the Contractor's convenience, or (ii) as a result of a Contractor proposed construction method or detail;

4. City's failure to obtain timely access to the right-of-way; or

5. City's failure to review a submittal or provide notification in the time specified.

Federal Aid Contract: A project that is identified within the Special Specifications as being financed with Federal funding and for which you and the City must follow unique Federal requirements.

Highway: Highway or Highway Right of Way means the work site(s) as identified in the contract.

Holiday: Holiday shown in the following table:

Holiday Date Observed
Sunday Every Sunday
New Year’s Day January 1st
Birthday of Martin Luther King, Jr. 3rd Monday in January Washington’s Birthday 3rd Monday in February
Memorial Day Last Monday in May
Independence Day July 4th
Labor Day 1st Monday in September
Indigenous Peoples Day 2nd Monday in October
Veterans Day November 11th
Thanksgiving Day 4th Thursday in November
Day after Thanksgiving Day after Thanksgiving Day
Day before Christmas Day Last working day prior to Christmas Day Christmas Day December 25th
Day before New Year’s Day Last working day prior to New Year’s Day Caesar Chavez Day is not a City recognized Holiday but can be recognized through a written change order. If the holiday falls on a Sunday, the Monday following is a holiday. If the holiday falls on a Saturday, the preceding Friday is a holiday.

Laboratory: The City or a designated laboratory authorized by the City to test materials and work involved in the contract.

Landscape Architect: The Engineer as defined in this section.

MUTCD: The most current version of the California Manual on Uniform Traffic Control Devices.

Office of Structure Design: The Office of the City Engineer at the address located in the special provisions for the submission of bids.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-4 10/26/2022
Plans:

1. Project Plans: Drawings specific to the project, including authorized shop drawings.

2. Engineering Standards: Drawing standard to City of Emeryville.

3. Standard Plans: Drawing standard to Caltrans.

Permanent erosion control establishment period: Number of working days shown on the Notice to Bidders for permanent erosion control establishment work Plant establishment period: Number of working days shown on the Notice to Bidders for plant establishment work.

Specifications: The directions, provisions and requirements contained in the City of Emeryville, Standard Specifications and engineering standards as supplemented by the special provisions. Whenever the term “these specifications” or “these Standard Specifications” is used in this book, it means the provisions set forth in this book, in conjunction with, by reference, the edition of the State Standard Specifications as referenced in the beginning of this book. The Department of Transportation publications entitled Labor Surcharge and Equipment Rental Rates and General Prevailing Wage Rates are to be considered as a part of the special provisions.

State: The City of Emeryville.

Transportation Building, Sacramento City Hall, City of Emeryville, State of California.

State Highway Engineer The City Engineer of the City of Emeryville, State of California.

State Standard Specifications: Means the Standard Specifications of the California Department of Transportation, Business and Transportation Agency, dated 2015.

The Greenbook. Parts 2 through 6 of the Standard Specifications for Public Works Construction, 2015 Edition.

SECTION 1-1.08 DISTRICTS
Delete Section 1-1.08 Districts.

SECTION 1-1.11 WEB SITES, ADDRESSES, AND TELEPHONE NUMBERS Add to Section 1-1.11 Web Sites, Addresses, and Telephone Numbers as follows:

Reference Web Site Address Telephone Number
City of
Emeryville http://www.emeryville.org/ 1333 Park Avenue Emeryville, CA 94608 510-596-4334 On-line Plan
Repository
http://www.ciplist.com and
http://emeryville.org/904/RFPs-Bids
Delete from Section 1-1.11 Web Sites, Addresses, and Telephone Numbers the reference to Bidders' Exchange.

SECTION 1-1.12 MISCELLANY
Replace Section 1-1.12 Miscellany with the following:

Make checks and bonds payable to the City of Emeryville.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-5 10/26/2022
2 BIDDING
The Bidder's attention is directed to the provisions in Division I, Section 2, Bidding, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

The form of Bidder's Bond will be found following the signature page of the Proposal.

In accordance with Public Contract Code Section 7106, a Non-collusion Affidavit is included in the proposal.

Signing the proposal shall also constitute signature of the Non-collusion Affidavit.

Replace, Delete or Add to Division I, Section 2, Bidding, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 2-1.01 GENERAL
Replace Section 2-1.01 General with the following:

Section 2 includes specifications related to bid eligibility and the bidding process.

SECTION 2-1.02 BID INELIGIBILITY
Replace Section 2-1.02 Bid Ineligibility with the following:

If an individual, firm, partnership or corporation, including any of its affiliates, partners, officers, employees, parent companies or subsidiaries, has provided architectural or engineering services to the City for this Contract before bid submittal for this Contract, then such individual, firm, partnership and corporation, and any of its affiliates, partners, officers, employees, parent companies or subsidiaries is prohibited from any of the following:

1. Submitting a bid

2. Subcontracting for a part of the work

3. Supplying materials.

The firm of Kimley Horn has provided engineering services to the City for this Contract. Therefore, this firm, and any of their affiliates, partners, officers, employees, parent companies or subsidiaries are prohibited from being awarded the Contract for the project, subcontracting for a portion of the work under the Contract, or supplying materials for the work under the Contract. Accordingly, these persons and entities are ineligible to bid on the project and no Contract shall be awarded to such persons or entities identified as the Contractor, subcontractor or supplier on a submitted bid proposal for this Contract.

SECTION 2-1.03 CONTRACTOR REGISTRATION
Replace Section 2-1.03 Contractor Registration with the following:

No contractor or subcontractor may be listed on a bid proposal for this Contract unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].

SECTION 2-1.05 ADDENDUM
Add Section 2-1.05 Addendum as follows:

During the course of the bidding process if changes are made to the Plans, Specifications, Bid Documents or other Contract Documents, they will be posted to http://www.ciplist.com and http://emeryville.org/904/RFPsBids for prospective Bidders.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-6 10/26/2022
If discrepancies or apparent errors are found in the Contract Documents prior to the date of bid opening, Bidders shall submit a written request for clarification to the City Engineer, a minimum of Five (5) Days prior to Bid Date, which response to said request will be given in the form of addenda to all Bidders, if time permits.

The correction of any discrepancies in, or omissions from the Plans, Specifications, Bid Documents or other Contract Documents, or any interpretation thereof, during the bidding process will be made only by Addendum issued in writing by the City and signed by the City Engineer. A copy of each such Addendum issued by the City will be posted to http://www.ciplist.com and http://emeryville.org/904/RFPs-Bids. Any other interpretation or explanation of such documents will not be considered binding.

All Addenda must be signed by a Bidder and included with their proposal at the time of bid opening.

SECTION 2-1.06 BID DOCUMENTS
SECTION 2-1.06A GENERAL
Replace Section 2-1.06A General with the following:

The Bid Documents, set forth in Part A of City of Emeryville Specifications, include bid proposal form, certifications, bidder’s bond, declarations and acknowledgements. A standard proposal form, which, when filled out and executed shall be submitted as that Bidder's bid. Bids not presented on forms so furnished, and copies or facsimiles of the Bidder's completed and executed proposal forms submitted as a bid may be rejected by Owner in its sole discretion. Bid Documents, including Plans, Specifications, Notice Inviting Bids, Supplemental Specifications and any Addendum can be obtained on the internet at http://www.ciplist.com and http://emeryville.org/904/RFPs-Bids. State of California Department of Transportation Standard Specifications, 2015, and State of California Department of Transportation Standard Plans, 2015, are available for review at the City Public Works Office.

SECTION 2-1.06B SUPPLEMENTAL PROJECT INFORMATION
Replace Section 2-1.06B Supplemental Project Information with the following:

The availability or use of information described in this Section is not intended to be and shall not be construed to relieve the Bidder or Contractor from properly examining the site and making such additional investigations as it may elect, or from properly fulfilling all the terms of the Contract Documents.

SECTION 2-1.07 JOB SITE AND DOCUMENT EXAMINATION
Replace Section 2-1.07 Job Site And Document Examination with the following:

Examine the job site and Bid Documents. Notify the City of apparent errors and patent ambiguities in the Plans, Specifications, Notice Inviting Bids, Bid Documents, Supplemental Specifications and any Addendum. Failure to do so may result in rejection of a bid or rescission of an award.

Bid submission is your acknowledgment that you have examined the job site and Plans, Specifications, Notice Inviting Bids, Bid Documents, Supplemental Specifications and any Addendum and are satisfied with:

1. General and local conditions to be encountered;

2. Character, quality, and scope of work to be performed;

3. Quantities of materials to be furnished;

4. Character, quality, and quantity of surface and subsurface materials or obstacles; and

5. Requirements of the Contract.

SECTION 2-1.09 BID ITEM LIST
Replace Section 2-1.09 Bid Item List with the following:

Submit a bid based on the bid item quantities shown on the Bid Sheets.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-7 10/26/2022
SECTION 2-1.10 SUBCONTRACTORS LIST
Replace Section 2-1.10 Subcontractors List with the following:

On the Subcontractors List form, list each subcontractor that will perform work in an amount in excess of 1/2 of 1 percent of the total bid or $10,000, whichever is greater (Pub Cont. Code § 4100 et seq.).

For each subcontractor listed, the Subcontractors List form must show:

1. Business name and the location of its place of business.

2. California contractor license number.

3. Department of Industrial Relations contractor registration number.

4. Portion of work it will perform. Show the portion of the work by:

4.1. Bid item numbers for the subcontracted work

4.2. Dollar value and percentage of the subcontracted work for each bid item listed

4.3. Description of the subcontracted work if the percentage of the bid item listed is less than 100 percent
SECTION 2-1.12 DISADVANTAGED BUSINESS ENTERPRISES
Add to Section 2-1.12A:

This section is applicable to federally funded projects and only as directed in the special provisions.

SECTION 2-1.15 DISABLED VETERAN BUSINESS ENTERPRISES
Add to Section 2-1.15A:

This section is applicable only as directed in the special provisions.

SECTION 2-1.18 SMALL BUSINESS AND NON–SMALL BUSINESS SUBCONTRACTOR PREFERENCES Add to Section 2-1.18A:

This section is applicable only as directed in the special provisions.

SECTION 2-1.27 CALIFORNIA COMPANIES
Delete Section 2-1.27 California Companies.

SECTION 2-1.33 BID DOCUMENT COMPLETION AND SUBMITTAL
SECTION 2-1.33A GENERAL
Replace Section 2-1.33A General with the following:

Furnish a bid using blank forms provided in the Bid Documents. Bid must include all forms securely sealed in a suitable envelope and must be signed by the Bidder. Use the forms provided in the Bid Documents except as otherwise specified for a bidder's bond.

Do not fax or email bids. Failure to submit the bid as specified may result in a nonresponsive bid.

If an agent other than the authorized corporate officer or a partnership member signs the bid, file a Power of Attorney with the City either before opening bids or with the bid. Otherwise, the bid may be nonresponsive.

SECTION 2-1.33B ELECTRONIC BIDS
Delete Section 2-1.33B Electronic Bids.

SECTION 2-1.33D BID FORM SUBMITTAL SCHEDULES
SECTION 2-1.33D(1) GENERAL
Replace Section 2-1.33D(1) General with the following:

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-8 10/26/2022
The Bid Document includes forms specific to the Contract. The deadlines for the submittal of the forms vary.

Determine the requirements of the Contract and submit the forms based on the applicable deadline.

Bid forms and information on the form that are due after the time of bid may be submitted at the time of bid.

SECTION 2-1.34 BIDDER’S SECURITY
Replace Section 2-1.34 Bidder’s Security with the following:

Submit one of the following forms of Bidder’s security equal to at least ten percent (10%) of the bid: (i) cash; (ii) cashier’s check; (iii) certified check; or (iv) signed Bidder’s Bond by an admitted surety insurer.

Submit cash, cashier’s check, certified check, or Bidder’s Bond to the City as part of your bid.

The Bidder's Bond must conform to the bond form shown in the Bid Documents for the project and must be properly filled out and executed. The surety’s signature must be notarized and the surety’s power of attorney must be attached. Original signatures are required.

SECTION 2-1.37 BID SUBMITTAL
Add Section 2-1.37 Bid Submittal as follows:

Submit your bid under sealed cover, marked outside of the envelope containing the bid in compliance with the instructions contained in the Notice Inviting Bids. No bid will be considered unless accompanied by Bidder’s security equal to at least ten percent (10%) of the bid in the form of: (i) cash; (ii) cashier’s check; (iii) certified check; or (iv) signed Bidder’s Bond which must comply with Section 2-1.34.

If the bid is made by an individual, the individual’s name and mailing address must be shown. If made by a firm or a partnership, the name and mailing address of each member of the firm or partnership must be shown. If made by a corporation, the bid must show the name of the state under the laws of which the corporation was chartered, and the names, titles and business addresses of the president, secretary and treasurer.

SECTION 2-1.40 BID WITHDRAWAL
Replace Section 2-1.40 Bid Withdrawal with the following:

Bids are not considered filed with the City until the date and time of bid opening.

A Bidder may withdraw or revise a bid after it has been submitted to the City if this is done before the bid opening date and time.

SECTION 2-1.43 BID OPENING
Replace Section 2-1.43 Bid Opening with the following:

The City publicly opens and reads bids at the time and place shown on the Notice Inviting Bids.

SECTION 2-1.46 DEPARTMENT’S DECISION ON BID
Replace Section 2-1.46 Department’s Decision On Bid with the following:

The City's decision on the bid amount is final.

The City may reject:

1. All bids

2. A nonresponsive bid.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-9 10/26/2022
SECTION 2-1.47 BID RELIEF
Replace Section 2-1.47 Bid Relief with the following:

The City may grant bid relief under Pub Contract Code § 5100 et seq. Submit any request for bid relief to the Director within five (5) calendar days after the opening of the bids.

SECTION 2-1.48 RESERVED
Add Section 2-1.48 BID PROTESTS as follows:

1. Any protest of the proposed Project award must be submitted in writing to the City no later than 5:00 PM on the third business day following the date of the bid opening.

2. The protest must contain a complete statement of the basis for the protest.

3. The protest must state the facts and refer to the specific portion of the document or the specific statute that forms the basis for the protest. The protest must include the name, address, and telephone number of the person representing the protesting party.

4. The party filing the protest must concurrently transmit a copy of the protest to the proposed awardee.

5. The party filing the protest must have submitted a bid for the Project. A subcontractor of a party filing a bid for the Project may not submit a bid protest. A party may not rely on the bid protest submitted by another bidder but must timely pursue its own protest.

6. The procedure and time limits set forth in these Instructions to Bidders are mandatory and are the bidders’ sole and exclusive remedy in the event of a bid protest. Any bidder’s failure to fully comply with these procedures shall constitute a waiver of any right to further pursue a bid protest, including filing of a challenge of the award pursuant to the California Public Contract Code, filing of a claim pursuant to the California Government Code, or filing of any other legal proceedings.

7. The City shall review all timely protests prior to award of the Project. The City shall not be required to hold an administrative hearing to consider any protests but may do so at its option. At the time of the City Council’s consideration of the Project award, the City Council shall also consider the merits of any timely protests. The City Council may either reject the protest and award to the lowest responsible bidder or accept the protest and award the bid to the next lowest responsible bidder. Nothing in this section shall be construed as a waiver of the City Council’s right to reject all bids.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-10 10/26/2022
3 CONTRACT AWARD AND EXECUTION
The Bidder's attention is directed to the provisions in Division I, Section 3, Contract Award And Execution, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 3, Contract Award And Execution, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 3-1.04 CONTRACT AWARD
Replace Section 3-1.04 Contract Award with the following:

If the City awards the contract, the City will use best efforts to award the contract to the lowest responsive bid submitted by a responsible Bidder within 90 calendar days after opening of the bids.

SECTION 3-1.04B ADDITIVE/DEDUCTIVE CONTRACT AWARD
Add Section 3-1.04B Additive/Deductive Contract Award as follows:

When the bid proposal form includes additive or deductive alternates, the Engineer will determine the lowest bid as defined in the special provisions. If no method is defined in the special provisions, the lowest bid is determined on the base price without consideration for the prices of the additive or deductive alternates in compliance with Section 20103.8 of the Public Contract Code.

The City reserves the right to award or not award the Contract including or omitting the alternates.

Determination as to whether or not the alternates are included in the Contract will be made by the City.

All requirements in the Contract apply to the work required to complete the alternates.

SECTION 3-1.05 CONTRACT BONDS
Replace Section 3-1.05 Contract Bonds with the following:

Furnish two good and sufficient bonds to the City of Emeryville, California. Each bond must be in the amount equal to one hundred percent of the Total Contract Price. One bond is for payment of claims for labor and materials, and the other bond for faithful performance.

Within ten (10) calendar days from the date the Contractor is notified of award of the Contract, the Contractor shall deliver to the City the bonds required above on the forms supplied by the City. Failure to do so may, in the sole discretion of City, result in the forfeiture of Contractor’s bid security. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the City. Any bond signed by an agent must be accompanied by a certified copy of such agent’s authority to act. If the surety on any bond provided by Contractor is declared bankrupt or becomes insolvent or it’s right to do business is terminated in any state where any part of the work is located, Contractor shall, within seven (7) days thereafter, substitute another bond and surety in accordance with the requirements set forth herein. Any alteration or alterations made in the Plans and Specifications which are a part of this Contract or in any provision of this Contract shall not operate to release any surety from liability on any required bond and the consent to make such alterations is hereby given. Any surety on such bonds hereby waives the provisions of Section 2819 of the Civil Code. Bonds must remain in full force during the guaranty period. The required payment and performance bond forms are included in the Bid Documents.

SECTION 3-1.07 INSURANCE POLICIES
Add to Section 3-1.07 Insurance Policies with the following:

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-11 10/26/2022
Procure and maintain, for the duration of the Contract, insurance against claims for injuries to persons, including death or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his Agents, Representatives, Employees, or Subcontractors. The cost of insurance is included in your bid.

All certificates and endorsements are to be received, reviewed and approved by the Engineer before the City will execute the Contract. The City reserves the right to require complete, certified copies of all required insurance policies, at any time.

SECTION 3-1.08 SMALL BUSINESS PARTICIPATION REPORT
Delete Section 3-1.08 Small Business Participation Report.

SECTION 3-1.18 CONTRACT EXECUTION
Replace Section 3-1.18 Contract Execution with the following:

The successful Bidder must execute and deliver to the Engineer the signed Contract, performance and payment bonds, executed guarantee, insurance certificates and endorsements, including certified copies of any and all insurance policies, if requested by the Engineer, Federal W-9 tax Form, and proof of Emeryville Business License.

The Engineer must receive these documents with ten (10) calendar days after the Bidder receives the Contract.

The Bidder’s Bond may be forfeited for failure to execute the Contract and provide the Engineer with all documents within the time specified.

SECTION 3-1.20 CITY BUSINESS LICENSE
Add 3-1.20 City Business License
The Contractor shall obtain a City Business License and for each subcontractor not already so licensed. The cost shall be included in his bid.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-12 10/26/2022
4 SCOPE OF WORK
The Bidder's attention is directed to the provisions in Division I, Section 4, Scope of Work, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 4, Scope of Work, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 4-1.02 INTENT
Add to Section 4-1.02 Intent the following:

All work and materials shall be in full accordance with the latest adopted standards and regulations of the State Fire Marshal; the California Building Code; Title 24 of the California Code of Regulations; the California Electrical Code; the California Plumbing Code; Americans With Disabilities Act; and all other applicable codes, laws, rules or regulations. Nothing in these Contract Documents is to be construed to permit work not conforming to these requirements. The Contractor agrees that immediately upon signing of the Contract, Contractor will diligently review the Contract Documents and determine if any work described or inferred within the Contract Documents is not in conformance with these requirements. Should the Contractor discover work within the Contract Documents not in conformance with these requirements, the Contractor agrees to immediately notify the Engineer in writing of said nonconformance, and to not proceed with nonconforming work. When the work detailed in the Contract Documents differs from governing codes, it is understood and agreed that the Contract sum is based upon the more costly or expensive standard.

The intent of the plans and Specifications is to prescribe the details for the construction and completion of the work which the Contractor undertakes to perform in accordance with the terms of the Contract, and that the work performed under the Contract results in a complete operating system in satisfactory working condition with respect to the functional purposes of the installation, and no extra compensation will be allowed for anything omitted but fairly implied. The prices paid for the various items in the proposal shall include full compensation for furnishing all labor, materials, tools, equipment, overhead, profit, incidentals, and doing all work necessary to complete the finished product as provided in the Contract Documents. Where the plans or Specifications describe portions of the work in general terms, but not in complete detail, it is understood that only the best general practice is to prevail and that only materials and workmanship of the finest quality are to be used. The Contractor shall furnish all labor, materials, tools, equipment, and incidentals, and do all the work involved in executing the Contract to the highest possible standard of workmanship.

Should it appear that the work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained in the Contract Documents, or in the event of any doubt or question arising respecting the true meaning of the Contract Documents, the Contractor shall apply to the Engineer in writing for such further explanations as may be necessary, and the Engineer shall render his or her decisions thereon. The Contractor shall thoroughly review all Requests for Information (RFI's) submitted by subcontractors prior to submission to the Engineer to determine whether such RFI's is already answered in the Contract Documents. The Contractor represents to City, that by submission of an RFI, the Contractor has thoroughly reviewed the RFI and thoroughly reviewed the Contract Documents, and determined that the RFI is not answered or reasonably inferable in the Contract Documents, and that the RFI pertains to an unforeseen condition or circumstance that is not described in the Contract Documents, that there is a conflict or discrepancy in the Contract Documents, or there is an omission in the Contract Documents.

You are responsible to obtain a copy of the Plans, Specifications and current applicable standards and keep them at the job site for reference.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-13 10/26/2022
You must maintain on the job site information on the manufacturer’s recommendation for installation or application when that information exists.

SECTION 4-1.05 CHANGES AND EXTRA WORK
SECTION 4-1.05A GENERAL
Add to Section 4-1.05A General the following:

In instances where you and the City dispute that certain work is extra work or a change in the character of the work, you are responsible to obtain from the Engineer, for the disputed work, agreement on: (i) labor; (ii) materials; and (iii) equipment.

The agreement for disputed work must be on a form provided by City and signed by both parties. Contractor shall maintain and submit these records in compliance with Section 5-1.27. The Agreement for Disputed Work signed by the Engineer does not constitute agreement by the City to pay for disputed work. 4-1.06 DIFFERING SITE CONDITIONS
Add 1.06 D Archaeological Discoveries
Refer to Section 14-2.03 of Standard Specifications
SECTION 4-1.07 VALUE ENGINEERING
Add to Section 4-1.07 Value Engineering as follows:

This section is applicable only as directed in the special provisions.

SECTION 4-1.13A WORK SITE MAINTENANCE
Add Section 4-1.13A Work Site Maintenance as follows:

You agree, by acceptance of a Contract or issuance of permit, to properly maintain the work site in a safe, clean and neat condition at all times.

Prior to the end of each workday you must remove all equipment and construction materials from the public right-of-way and authorized encroachments to private property, except as may be authorized by such permits.

The public right-off-way and encroachments to private property must be clean of any construction materials including but not limited to concrete, oils, asphalt, sand, aggregate, base, construction material packaging.

At the direction of the Engineer, use a self-loading motor street sweeper with spray nozzles to clean the rightof-way. Do not use street sweepers or blowers that use high velocity air to disperse or blow contaminants out of project area. Clean project area and surrounding perimeter including any other area impacted by this work.

Any traffic stripes or pavement markings that are removed or obliterated during work must be replaced with temporary tape, markers, or paint prior to opening the area to traffic. This maintenance and repair responsibility will run for the life of the encroachment and guarantee period. Replace with permanent striping and pavement markings in compliance with Section 84.

SECTION 4-1.13B STOCKPILES
Add Section 4-1.13B Stockpiles as follows:

Keep stockpile materials in the street to a minimum and remove by the end of each work day. Sweeping is required to remove stockpile residue either by hand, or at the direction of the Engineer, by mechanical street sweeper.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-14 10/26/2022
Provisions must be made for controlling dust, arising for whatever reason, from stockpile materials or work on the project. You are responsible for maintaining all stockpile areas in a neat and dust-free condition, with adequate storm water controls. Comply with Section 5-1.20B(4).

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-15 10/26/2022
5 CONTROL OF WORK
The Bidder's attention is directed to the provisions in Division I, Section 5, Control of Work, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 5, Control of Work, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 5-1.01 GENERAL
Replace the 9th paragraph in Section 5-1.01 General with the following:

Whenever you change the normal agreed-to hours of work you must provide 24-hour notice to the Engineer.

The Engineer may or may not approve such a change. If the change is not approved, any work you perform outside the normal hours of work and in the absence of the Engineer will be subject to rejection.

Normal hours of work fall between 7:00 A.M. and 5:00 P.M. Monday through Friday excluding City holidays. Obtain approval from the City for any work between the hours of 5 P.M. and 7 A.M., or on Saturday, Sunday or City holidays pursuant to Chapter 13 of Title 5 of the Emeryville Municipal Code.

SECTION 5-1.02 CONTRACT COMPONENTS
Replace Section 5-1.02 Contract Components with the following:

A component in one contract part applies as if appearing in each. The parts are complementary and describe and provide for complete work. These standard specifications work in conjunction with:

1. project plans;

2. engineering standards;

3. standard plans;

4. manufacturer’s recommendations.

Where materials and methods are specified, details in plans and standards are to be consulted to provide full information needed to complete installations.

If a discrepancy exists, the governing ranking of Contract parts in descending order is:

1. All Approved Contract Change Orders to the Agreement

2. Construction Agreement

3. Notice Inviting Bids

4. Bid or Proposal accepted by the City

5. project special provisions;

6. project plans;

7. Part B General Provisions

8. City engineering standards; Including Greenbook, 2015 Edition Parts 2 through 6

9. City standard specifications;

10. State standard specifications;

11. State standard plans;

12. Written numbers and notes on a drawing govern over graphics;

13. A detail drawing governs over a general drawing;

14. A detail specification governs over a general specification;

15. A Specification in a section governs over a specification referenced by that section.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-16 10/26/2022
Where manufacturer's recommendations for installation are more stringent than those prescribed in the standard specifications or the special provisions, the manufacturer's recommendations will take precedence. This condition may be waived at the discretion of the Engineer.

Working drawings must be submitted in compliance with the provisions in Section 5-1.23.

SECTION 5-1.02B SEQUENCING
Add Section 5-1.02B Sequencing as follows:

Work within any block must be finished and the right-of-way completely restored (including finished pavement) prior to commencing work at any other permitted location or along any other portion of a permitted route. The Engineer may grant exceptions for permitted activities with low impacts to traffic (e.g. directional bore).

SECTION 5-1.09 PARTNERING
Delete Section 5-1.09 Partnering.

SECTION 5-1.12 ASSIGNMENT
Replace Section 5-1.12 Assignment with the following:

The performance of all or any part of the Contract may not be assigned. Further, the right to receive any or all Contract payments may not be assigned.

SECTION 5-1.13 SUBCONTRACTING
SECTION 5-1.13A GENERAL
Replace 5th paragraph in Section 5-1.13A General with the following:

Perform work equaling at least 40 percent of the value of the original total bid with your employees, equipment, rental equipment with operator or rental equipment without operators.

SECTION 5-1.13B DISADVANTAGED BUSINESS ENTERPRISE
Delete Section 5-1.13B Disadvantaged Business Enterprise.

SECTION 5-1.13C DISABLED VETERAN BUSINESS ENTERPRISES
Delete Section 5-1.13C Disabled Veteran Business Enterprises.

SECTION 5-1.13D NON-SMALL BUSINESSES
Delete Section 5-1.13D Non-Small Businesses.

SECTION-1.15 MEANS & METHODS
Add 5-1.15 Means and Methods
The City will not have control over, be in charge of, nor be responsible for construction means, methods, techniques, sequences, or procedures, or for the safety precautions and programs in connection with the work, since these are solely Contractor's responsibility.

The City or adjacent property owner may perform other work adjacent to or within the project area, concurrent with the Contractor's operations. The Contractor shall cooperate fully with the City in all operations which coincide with other work being performed and provide City with such scheduling and other information as may be required by the City to perform such other work. The Contractor shall conduct operations to minimize interference with the work of other forces or contractors performing such work. This work performed by a second contractor may include work which is incomplete or in dispute with the Contractor.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-17 10/26/2022
Any disputes or conflicts which may arise between the Contractor and any other forces or contractors retained by the City, causing delays or hindrance to each other, shall be referred to the Engineer for resolution.

The City shall have the right at any time during the progress of this work to take over and place in service any completed or partially completed portion of the work, notwithstanding the time for completion of the entire work or such portions which may not have expired; but such taking possession thereof shall not be deemed an acceptance of any of the work, nor work on those portions not completed in accordance with the Contract Documents.

SECTION 5-1.16 REPRESENTATIVE
Add to Section 5-1.16 Representative with:

If such project superintendent is not present, the City may deduct from the contract price an amount equivalent to the reasonable hourly rate for a superintendent for each hour or fraction thereof such person is not present on the project site.

SECTION 5-1.17 CHARACTER OF WORKERS
Add to Section 5-1.17 Character of Workers the following:

If in the opinion of the Engineer, any person associated with the Project including but not limited to an employee of the Contractor fails, to comply with Contract provisions after receiving either written or oral notification, at the discretion of the Engineer, that person must not again be employed on the work or project.

SECTION 5-1.18 CHANGE DUE TO MATERIALLY DIFFERENT CONDITIONS Add 5-1.18 Change Orders Due To Materially Different Conditions If any of the conditions set forth in Sections 5-1.16 "Hazardous Waste in Excavation" and 5-1.17 "Trenching Conditions" above, are encountered, the City will promptly investigate the conditions, and if it finds that (1) the conditions do materially differ, or do involve hazardous waste, and (2) cause a decrease or increase in the contractor's cost of, or the time required for, performance of any part of the work, the City will issue a change order under the procedures described in the Standard Specifications Section 4-1.03.

In the event that a dispute arises between the City and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the contractor's cost of, or time required for, performance of any part of the work, the Contractor shall not be excused from any scheduled completion date provided for by this Contract, but shall proceed with all work to be performed under this Contract. The Contractor shall retain any and all rights provided under law which pertain to the resolution of disputes and protests between the contracting parties.

SECTION 5-1.20B PERMITS. LICENSES, AGREEMENTS, AND CERTIFICATIONS SECTION 5-1.20B(3) AFTER AWARD
Add to Section 5-1.20B(3) After Award as follows:

Contractor is required to prepare and Submit a Waste Management Plan. On-line Plan Prep Tools are available at www.emeryville.wastetracking.com. Paper Plan Prep tool are available at http:///emeryville.org/DocumentCenter/View/10133. As of August, 2018 online tools cost 1/3 of the paper tools cost.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-18 10/26/2022
SECTION 5-1.20B(4) CONTRACTOR–PROPERTY OWNER AGREEMENT
Add to Section 5-1.20B(4) Contractor–Property Owner Agreement as follows:

Obtain approval of City Engineer of a Construction Stormwater Pollution Prevention Plan in accordance with Article 3, Chapter 13, Title 6 of the City of Emeryville Municipal Code, and any permit that may be required in accordance with Chapter 5, Title 7 of the City of Emeryville Municipal Code, for the stockpiling of materials in the City. Dispose of all materials not used in work in a legal manner.

Prior to use, furnish the Engineer evidence that properties have required permits, licenses and clearances to be a temporary storage site for stockpiling.

SECTION 5-1.20B(5) COMPLY WITH LOCAL, STATE AND FEDERAL REGULATIONS Add Section 5-1.20B(5) Comply with Local, State and Federal Regulations as follows:

You are responsible to comply with all local, state and federal rules, regulations and statutes as it relates to the work under the Contract in compliance with the Contract Documents.

Should you fail to meet the requirements of a permit or rule, regulation or statute as it pertains to work under the Contract, and the City has notice of an impending fine or mitigation measure to be levied or imposed against the City, the City may withhold payment or portions of payment in compliance with Section 9-1.16E in an amount sufficient to satisfy any fine or mitigation measure that may be levied or imposed on the City in addition to any other retention held.

SECTION 5-1.20G CITY AUTHORIZATIONS AND PERMITS
Add Section 5-1.20G City Authorizations and Permits as follows:

If you desire to discharge to the sanitary sewer, you must receive prior permission from the East Bay Municipal Utility District (EBMUD) Wastewater Collection Supervisor and the City. Flushing waterlines must comply with Section 77-3.

If permission to discharge requires an Industrial User Discharge Permit, you must submit an Industrial User Discharge Permit Application to EBMUD’s Wastewater Collection Supervisor and the City Environmental Programs Manager. You must comply with all conditions of the issued permit and pay all applicable fees. Maintain proof of authorization to discharge at the job site at all times and provide that information to Engineer upon request.

An Alameda County Fire Protection District (a.k.a. Fire Department) permit is required prior to crossing any liquid petroleum or high-pressure gas main. If a prior encroachment conflicts with the proposed work, you must arrange for any necessary removal or relocation with the prior permittee. Any such removal or relocation will be at no expense to the City.

Before using explosives in work, you must receive authorization from the Engineer and obtain a permit for use from the Alameda County Fire Protection District (a.k.a. Fire Department). You may also be required to increase the amount of insurance coverage if, in the opinion of the Engineer, your insurance does not include sufficient coverage for use of explosives.

SECTION 5-1.23 SUBMITTALS
SECTION 5-1.23A GENERAL
Replace Section 5-1.23A General with the following:

Submittals are required for (i) materials and equipment not specified by standards, or a trade name and number, (ii) for working drawings. Submittals are also required when specified in the contract documents, and Regulatory Requirements.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-19 10/26/2022
Where products are clearly identified by standards or trade names and no substitution is proposed, no submittal is required.

Submit adequate descriptive information, from which the Engineer can determine if the proposed (i) materials, (ii) equipment, or (iii) working drawings are in compliance to the design concept and in compliance with the contract documents. Submittal must consist of (i) drawings, (ii) specifications, (iii) calculations, (iv) descriptive data, (v) certificates, (vi) samples, (vii) MSDS sheets, (viii) test results, and (ix) information required in the specifications.

Submittal will be reviewed for general compliance with the design concept and general compliance with the information given in the contract documents. Submittals will not be reviewed for (i) quantities, (ii) dimensions, (iii) coordination with the work of other trades, or (iv) construction safety precautions, all of which are your sole responsibility. Review of a specific item does not indicate acceptance of an assembly of which the item is a component. The Engineer and contract designer are not required to review and will not be responsible for any deviations from the contract documents not clearly noted. Partial submittals and partial grouped submittals will not be reviewed.

SECTION 5-1.23A(1) COORDINATION
Add Section 5-1.23A(1) Coordination as follows:

Submittals must be furnished by you to the Engineer. You must coordinate, compile and submit all required submittals from suppliers and subcontractors to the Engineer. All communications between you and a contract designer must be written and submitted to the Engineer to furnish to contract designer.

SECTION 5-1.23A(2) ORGANIZATION
Add Section 5-1.23A(2) Organization as follows:

Submittals must be accompanied with a transmittal. Contractor and City shall coordinate regarding an appropriate and acceptable indexing system to accompany transmittals.

SECTION 5-1.23D DEVIATION FROM CONTRACT
Add Section 5-1.23D Deviation from Contract as follows:

If you propose to provide any material, equipment or working drawings which deviates from the contract requirements, indicate this on the transmittal form accompanying the submittal. In the transmittal provide a brief description of submittal and why the deviation is requested and compare the material, coatings, mechanical functions, energy efficiency and warranty differences between the material specified and the material submitted.

SECTION 5-1.23E SUBMITTAL COMPLETENESS
Add Section 5-1.23E Submittal Completeness as follows:

Submittals which do not contain all the information required to allow the Engineer to make a determination as to the submittal’s acceptability and compliance with the project documents, will be returned without a complete review.

A resubmittal must be made.

SECTION 5-1.23F SUBMITTAL PACKAGE
Add Section 5-1.23F Submittal Package as follows:

Group submittals are to be made to expedite the review process and to reduce the likelihood of conflicts among submittals. Submittals for various items must be made as a single submittal when the items taken together constitute a manufacturer's package or are so functionally related that expediency indicates checking or review of the group or package as a whole. Conversely, various items which are not functionally related must be submitted separately.

Submittal packages which are not appropriately grouped will be returned without review. Provide one complete DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-20 10/26/2022
portable document format (PDF) file of each submittal to the Engineer. If you are unable to provide electronic documents, provide two complete copies of each submittal to the Engineer. The Engineer will retain one copy of the submittal and make good faith efforts to return one package to you within three weeks. Submittals that require review by a City consultant designer will require one additional copy of the submittal as well as one additional week of review time. Submittals that require review by an outside agency or utility company will require one additional copy of the submittal and additional review time as determined by the outside agency or utility company.

SECTION 5-1.23G RETURNED SUBMITTALS
Add Section 5-1.23G Returned Submittals as follows:

Returned submittals will indicate one of the following actions.

1. No Exceptions Taken – The review indicates that the material, equipment, or work method is in compliance with the design concept and complies with the contract documents. You may begin implementing the work method or incorporate the material or equipment covered by the submittal.

2. Make Corrections Noted – The review indicates limited corrections are required to the submittal in order for the material, equipment, or work method to be in compliance with the design concept and to comply with the contract documents. You may begin implementing the work method or incorporating the material and equipment covered by the submittal in compliance with the noted corrections. Where submittal information will be incorporated in Operation and Maintenance data, a corrected copy must be provided.

3. Revise and Resubmit – The review indicates that the submittal is insufficient or contains incorrect data. Except at your own risk, you may not undertake work covered by this submittal until it has been revised, resubmitted and returned marked either "No exceptions taken" or "Make corrections noted."

4. Rejected – The review indicates that the material, equipment, or work method is not in compliance with the design concept and not in compliance with the contract documents. Except at your own risk, you may not undertake the work covered by such submittals until a new submittal is made and returned marked either "No exceptions taken" or "Make corrections noted."

5. Information Only – The review indicates that the submittal contains contract required information.

SECTION 5-1.23H RESPONSIBILITY
Add Section 5-1.23H Responsibility as follows:

Review of working drawings or submittals does not relieve Contractor of responsibility for errors and does not indicate an assumption of risks or liability by the City, or by any officer or employee of City, or by any consulting firm conducting the review on behalf of the City and Contractor shall have no claim under the Contract on account of the failure, or partial failure, of the method of work, material or equipment reviewed. A mark of "No exceptions taken" or "Make corrections noted" means that the City has no objection to you using the plan, method of work proposed or providing the materials or equipment proposed.

SECTION 5-1.23I CHARGES FOR THIRD PARTY SUBMITTAL REVIEW Add Section 5-1.23I Charges for Third Party Submittal Review as follows:

The Engineer will allow up to two reviews of each submittal. If Contractor is required to make a third or subsequent submittal for any item, then the costs of the additional reviews will be at Contractor’s expense. The cost of the review will be deducted from payments due. The cost of the review by contract professional services will be on a time and materials basis at standard company billing rates. Billing for this expense will be in compliance with Section 9-1.23.

SECTION 5-1.26 CONSTRUCTION SURVEYS
Replace Section 5-1.26 Construction Surveys with the following:
5-1.26A General
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-21 10/26/2022
Contractor must provide the necessary horizontal and vertical survey control for the completion of the work.

Survey work must be performed by a Licensed Land Surveyor or a Registered Civil Engineer.

Control must be provided for site grading, significant layout, or as directed by the Engineer. Control must be provided in the same system of units as shown. Contractor must provide surface grade control every 50 feet and at grade breaks and begin and end of curves. Contractor must mark the control points in the field and provide a printed sheet with the point information, site layout, and control point layout to the Engineer. 5-1.26B Payment
Full compensation for work specified in Section 5-1.26A and applicable engineering standards is included in the payment for other bid items unless a bid item of work is shown on the bid item list.

SECTION 5-1.27E CHANGE ORDER BILLS
Replace Section 5-1.27E Change Order Bills with the following:

Contractor must deliver all Change Order Bills and support documents and disputed work daily agreements in writing to the Engineer. A Change Order Bill will not be accepted by the Engineer unless prior approval for the work has been given. A change order is approved when Contractor and the Engineer have each approved it in writing.

SECTION 5-1.32 AREAS FOR USE
Add to Section 5-1.32A Areas for Use the following:

Personal vehicles of contractor employees, construction equipment, and the contractor’s vehicle must be parked in areas approved by the Engineer.

SECTION 5-1.36 PROPERTY AND FACILITIES PRESERVATION
SECTION 5-1.36A GENERAL
Add to Section 5-1.36A General the following:

12. Infrastructure

13. street surfacing

14. traffic stripes

15. pavement markings and markers

16. survey monuments

17. bench marks

18. utilities

19. trees

20. traffic signal equipment including interconnecting conductors

21. other public fixtures

22. EV charging stations and related conduit.

Contractor shall comply with California Government Code § 4216 et seq. Contractor shall notify the Engineer at least 3 business days before Contractor contacts the regional notification center. Failure to contact the notification center prohibits excavation.

Restore facilities in kind in compliance with appropriate specifications, standards, and plans.

Monuments and bench marks must comply with Section 5-1.36.

Where trees or tree roots are present in the work area, tree protection must comply with Section 77-1.03A(2)(g) and Chapter 2 and Chapter 7 of Title 7 of the Emeryville Municipal Code.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-22 10/26/2022
The Engineer reserves the right to require you to video inspect any storm drain or sanitary sewer service line or mainline suspected of damage by your operation. The Engineer may require a video inspection of the damaged facility. Provide written notification to the property owner, with a copy to the Engineer, prior to any modification, repair or replacement of the damaged facility which, in the case of a damaged sanitary sewer service line or mainline, shall all be conducted in compliance with Chapter 8 of Title 7 of the Emeryville Municipal Code.

Damage to property and facilities must be reported immediately to the Engineer.

Prior to beginning work Contractor shall determine the location of any underground facilities. Contractor shall contact Underground Service Alert at 811 and request all utility lines to be marked.

SECTION 5-1.36A(1) TRENCHLESS OPERATIONS
Add Section 5-1.36A(1) Trenchless Operations as follows:

When any trenchless method is used to install or repair a utility, all pressurized utility lines and sewer laterals that will be crossed must be pot-holed. Other State or Federal requirements may apply. When completing work by a directional bore, Contractor must field locate and verify the condition, type of material and depth of all service lines and mainlines to be crossed.

If the bore will provide at least 3 feet of clearance from sewer laterals, field locating of sewer laterals may be waived by the Engineer.

SECTION 5-1.36B LANDSCAPE
Add to Section 5-1.36B Landscape as follows:

Contractor shall repair minor damage to turf by top dressing to create an even grade with amended topsoil and seeding with an approved seed mix. Damage to turf in excess of 100 square feet may be required to be replaced with sod in City’s sole discretion.
5-1.36C Railroad Property
Add to Section 5-1.36C.

If the Contract does not include an agreement with a railroad company, do not allow personnel or equipment on railroad property. Prevent material, equipment, and debris from falling onto railroad property.

SECTION 5-1.36D NONHIGHWAY FACILITIES
Replace Section 5-1.36D Nonhighway Facilities with the following:

Before starting work that could damage or interfere with underground infrastructure, locate the infrastructure described in the Contract, including laterals and other appurtenances, and determine the presence of other underground infrastructure inferred from visible facilities, such as buildings, meters, and junction boxes.

Underground infrastructure described in the Contract may be in different locations from those described, and additional infrastructure may exist.

Upon discovering an underground main or trunk line not described in the Contract, immediately notify the Engineer and the infrastructure owner. If the Engineer orders the locating and protecting of the infrastructure, then the locating and protecting of the infrastructure is change order work. If ordered, Contractor shall repair infrastructure damage. If the damage is not due to Contractor’s negligence, the repair is change order work.

Immediately notify the Engineer of a delay due to the presence of main-line underground infrastructure not described in the Contract or in a substantially different location.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-23 10/26/2022
Notify the Engineer if the infrastructure described in the Contract cannot be found. If after giving the notice, Contractor finds the infrastructure in a substantially different location from that described, efforts of Contractor to find the infrastructure is change order work.

The City may rearrange a nonhighway facility during the Contract. Rearrangement of a nonhighway facility includes installation, relocation, alteration, or removal of the facility.

The City may authorize facility owners and their agents to enter the highway to perform rearrangement work for their facilities or to make connections or repairs to their property. Coordinate activities to avoid delays. If necessary rearrangement of underground infrastructure is not described in the Contract, the Engineer may order Contractor to perform the work. The rearrangement is change order work.

Immediately notify the Engineer of a delay due to a rearrangement different from that described in the Contract.

If Contractor wants infrastructure rearrangement different from that described in the Contract, Contractor shall notify the Engineer, make an arrangement with the infrastructure owner, obtain authorization for the rearrangement from the Engineer and pay the infrastructure owner any additional cost.

The City does not adjust time or payment for a rearrangement different from that described in the Contract.

SECTION 5-1.36E SURVEY MONUMENTS
Add to Section 5-1.36E Survey Monuments as follows:

Contractor shall protect all survey monuments on and off the highway.

All survey and construction, maintenance or other work must be performed consistent with Section 8725 and 8771 of the California Business & Professions Code. Monuments and bench marks must be set by a Licensed Land Surveyor or a Registered Civil Engineer properly licensed to complete survey work. The City reserves the right to review the Land Surveyor or Engineer's license to determine its validity.

Sufficient controlling monuments shall be retained or replaced in their original positions to enable property, right-of-way and easement lines, property corners, and subdivision and tract boundaries to be reestablished.

Anything that appears to be a monument or benchmark must be reported to the Engineer prior to construction or disturbance. A Licensed Land Surveyor must locate and reference known monuments or benchmarks that will be disturbed by construction activities. A corner record shall be filed with the County prior to construction for any monument or benchmark that will be disturbed by construction. The corner record must detail the location of the monument and any tie-outs. Should the existing survey monument be disturbed or destroyed during construction, it must be reset at the previous location. All tie-outs must be removed after the original monument is re-established. Should any existing bench mark be disturbed or destroyed during construction, a new one must be set at a nearby, but different, location than the existing, as determined by the Engineer prior to construction. For monuments, a corner record must be filed with the County and a copy delivered to the Engineer before and after construction. For bench marks, documentation of the transferred bench mark, including a location map, field notes and surveyor certification, must be delivered to the Engineer prior the project acceptance. Damaged or disturbed property corners must be replaced by a Land Surveyor at the contractor’s or owner’s expense.

Upon discovery of a survey monument not identified and located immediately stop work near the monument and notify the Engineer. Do not resume work near the monument until authorized by the Engineer.

SECTION 5-1.38 MAINTENANCE AND PROTECTION RELIEF
Add to Section 5-1.38 Maintenance and Protection Relief as follows:

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-24 10/26/2022
However, nothing in this Section 5-1.38 providing for relief from maintenance and responsibility will be construed as relieving Contractor of full responsibility for correcting any defective work or materials found at any time.

SECTION 5-1.39 DAMAGE REPAIR AND RESTORATION
SECTION 5-1.39A GENERAL
Add to Section 5-1.39A General as follows:

Contractor must immediately repair or install approved alternate to any facility missing, damaged or non-operational as a result of its work, prior to continuing with the other Contract work. If the repairs are not made as required, Contractor agrees to the cost of those repairs made by others at the City’s direction in compliance with Section 9-

1.23. SECTION 5-1.39C LANDSCAPE DAMAGE
SECTION 5-1.39C(1) GENERAL
Add to the end of the 1st paragraph of Section 5-1.39C(1) General as follows:
or permanent erosion control establishment.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-25 10/26/2022
6 CONTROL OF MATERIALS
The Bidder's attention is directed to the provisions in Division I, Section 6, Control of Materials, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 6, Control of Materials, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 6-1.04 BUY AMERICA
Add to Section 6-1.04 Buy America as follows:

This section is applicable only as directed in the special provisions.

SECTION 6-1.05 SPECIFIC BRAND OR TRADE NAME AND SUBSTITUTION Replace Section 6-1.05 Specific Brand Or Trade Name And Substitution with the following:

Whenever the specifications permit the substitution of a similar or equivalent material or article, no tests or action relating to the approval of the substitute material will be made until Contractor’s request for substitution is made in writing accompanied by complete data as to the equality of the material or article proposed. The request must be made a minimum of ten working days prior to the bid opening date identified in the Notice to Bidders.

Substitutions requested after bid opening must be made in ample time to permit approval without delaying the work. Requests for substitutions must comply with Section 5-1.23.

Any substitutions that are approved must be furnished without additional cost to the City. If any changes are required for the proper installation and fit of alternative materials or equipment, or because of deviations from the contract plans and specifications, such changes must not be made without the consent of the Engineer and must be made without additional cost to the City.

SECTION 6-2 QUALITY ASSURANCE
SECTION 6-2.01 GENERAL
SECTION 6-2.01A GENERAL
Modify table in 7th paragraph regarding California Test for Relative compaction with the following:

Testing method for Relative Compaction is:

1. ASTM D-1557

2. ASTM D-2922

3. ASTM D-3017
SECTION 6-2.01B AUTHORIZED FACILITY AUDIT LISTS
Delete Section 6-2.01B Authorized Facility Audit Lists.

SECTION 6-2.01C AUTHORIZED MATERIAL LISTS
Delete Section 6-2.01C Authorized Material Lists.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-26 10/26/2022
7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
The Bidder's attention is directed to the provisions in Division I, Section 7, Legal Relations And Responsibility To The Public, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 7, Legal Relations And Responsibility To The Public, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 7-1.02I(2) NONDISCRIMINATION
Replace Section 7-1.02I(2) Nondiscrimination with the following:

Under 2 CA Code of Regs § 11105:

1. During the performance of this contract the recipient, contractor, and its subcontractors shall not deny the contract's benefits to any person on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status, nor shall they discriminate unlawfully against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status. Contractor shall insure that the evaluation and treatment of employees and applicants for employment are free of such discrimination.

2. Contractor shall comply with the provisions of the Fair Employment and Housing Act (Gov. Code, § 12900 et seq.), the regulations promulgated thereunder (Cal. Code Regs., tit. 2, § 11000 et seq.), the provisions of Article 9.5, Chapter 1, Part 1, Division 3, Title 2 of the Government Code (Gov. Code, §§ 11135-11139.5), and the regulations or standards adopted by the awarding state agency to implement such article.

3. Contractor or recipient shall permit access by representatives of the Department of Fair Employment and Housing and the awarding state agency upon reasonable notice at any time during the normal business hours, but in no case less than 24 hours' notice, to such of its books, records, accounts, and all other sources of information and its facilities as said Department or Agency shall require to ascertain compliance with this clause.

4. Recipient, contractor and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement.

5. The contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the contract.

Under 2 CA Code of Regs § 11122:

STANDARD CALIFORNIA NONDISCRIMINATION CONSTRUCTION CONTRACT SPECIFICATIONS (GOV. CODE SECTION 12990)
These specifications are applicable to all state contractors and subcontractors having a construction contract or subcontract of $5,000 or more.

1. As used in the specifications:
a. "Act" means the Fair Employment and Housing Act.
b. "Administrator" means Administrator, Office of Compliance Programs, California Department of Fair Employment and Housing, or any person to whom the Administrator delegates authority;

2. Whenever the contractor or any subcontractor subcontracts a portion of the work, it shall include in each subcontract of $5,000 or more the nondiscrimination clause in this contract directly or through incorporation by reference. Any subcontract for work involving a construction trade shall also include the Standard California Construction Contract Specifications, either directly or through incorporation by DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-27 10/26/2022
reference.

3. The contractor shall implement the specific nondiscrimination standards provided in paragraphs 6(a) through (e) of these specifications.

4. Neither the provisions of any collective bargaining agreement, nor the failure by a union with whom the contractor has a collective bargaining agreement, to refer members of any group protected by the Act shall excuse the contractor's obligations under these specifications, Government Code section 12990, or the regulations promulgated pursuant thereto.5. In order for the nonworking training hours of apprentices and trainees to be counted, such apprentices and trainees must be employed by the contractor during the training period, and the contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities.

Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor or the California Department of Industrial Relations.

5. In order for the nonworking training hours of apprentices and trainees to be counted, such apprentices and trainees must be employed by the contractor during the training period, and the contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities. Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor or the California Department of Industrial Relations.

6. The contractor shall take specific actions to implement its nondiscrimination program. The evaluation of the contractor's compliance with these specifications shall be based upon its effort to achieve maximum results from its actions. The contractor must be able to demonstrate fully its efforts under steps a. through e. below:
a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and at all facilities at which the contractor's employees are assigned to work. The contractor shall specifically ensure that all foremen, superintendents, and other on-site supervisory personnel are aware of and carry out the contractor's obligations to maintain such a working environment. b. Provide written notification within seven days to the director of the DFEH when the referral process of the union or unions with which the contractor has a collective bargaining agreement has impeded the contractor's efforts to meet its obligations. c. Disseminate the contractor's equal employment opportunity policy by providing notice of the policy to unions and training, recruitment and outreach programs and requesting their cooperation in assisting the contractor to meet its obligations; and by posting the company policy on bulletin boards accessible to all employees at each location where construction work is performed. d. Ensure all personnel making management and employment decisions regarding hiring, assignment, layoff, termination, conditions of work, training, rates of pay or other employment decisions, including all supervisory personnel, superintendents, general foremen, on-site foremen, etc., are aware of the contractor's equal employment opportunity policy and obligations, and discharge their responsibilities accordingly.
e. Ensure that seniority practices, job classifications, work assignments, and other personnel practices, do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the equal employment opportunity policy and the contractor's obligations under these specifications are being carried out.

7. Contractors are encouraged to participate in voluntary associations that assist in fulfilling their equal employment opportunity obligations. The efforts of a contractor association, joint contractor-union, contractor-community, or other similar group of which the contractor is a member and participant, may be asserted as fulfilling any one or more of its obligations under these specifications provided that the contractor actively participates in the group, makes every effort to assure that the group has a positive impact on equal employment opportunity in the industry, ensures that the concrete benefits of the program are reflected in the contractor's workforce participation, and can provide access to documentation that demonstrates the effectiveness of actions taken on behalf of the contractor. The obligation to comply, however, is the Contractor's.

8. The contractor is required to provide equal employment opportunity for all persons. Consequently, the contractor may be in violation of the Fair Employment and Housing Act (Government Code section 12990 DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-28 10/26/2022
et seq.) if a particular group is employed in a substantially disparate manner.

9. The contractor shall not use the nondiscrimination standards to discriminate against any person because race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status.

10. The contractor shall not enter into any subcontract with any person or firm decertified from state contracts pursuant to Government Code section 12990.

11. The contractor shall carry out such sanctions and penalties for violation of these specifications and the nondiscrimination clause, including suspension, termination and cancellation of existing subcontracts as may be imposed or ordered pursuant to Government Code section 12990 and its implementing regulations by the awarding agency. Any contractor who fails to carry out such sanctions and penalties shall be in violation of these specifications and Government Code section 12990.

12. The contractor shall designate a responsible official to monitor all employment related activity to ensure that the company equal employment opportunity policy is being carried out, to submit reports relating to the provisions hereof as may be required by OCP and to keep records. Records shall at least include for each employee the name, address, telephone numbers, construction trade, union affiliation if any, employee identification number when assigned, status, (e.g., mechanic, apprentice trainee, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in any easily understandable and retrievable form; however, to the degree that existing records satisfy this requirement, contractors shall not be required to maintain separate records.

SECTION 7-1.02K LABOR CODE
SECTION 7-1.02K(1) GENERAL
SECTION 7-1.02K(2) WAGES
SECTION 7-1.02K(3) CERTIFIED PAYROLL RECORDS (LABOR CODE §1776) Replace Section 7-1.02K(1) General, Section 7-1.02K(2) Wages, and Section 7-1.02K(3) Certified Payroll Records (Labor Code §1776) with the following:

Work on the job site must comply with Labor Code §1720 et seq. and 8 CA Code of Regulations §16000 et seq.

Work includes roadside production and processing of materials and hauling and delivery of ready-mix concrete.

1. LABOR CODE REQUIREMENTS. In the performance of this Contract, Contractor’s attention is directed to the following requirements of the Labor Code:

A. Hours of Labor. Eight hours labor constitutes a legal day’s work. Contractor shall forfeit, as penalty to City, $25 for each worker employed in the performance of the Contract by Contractor or by any subcontractor under it for each calendar day during which such worker is required or permitted to work more than eight hours in any one day and 40 hours in any one calendar week in violation of the provisions of the California Labor Code and in particular, Sections 1810 to 1815, inclusive. Work performed by employees of the Contractor in excess of eight hours per day and 40 hours during any one week shall be permitted upon compensation for all hours worked in excess of eight hours per day at not less than one-and-one-half times the basic rate of pay, as provided in Section 1815.

B. Prevailing Wages. Contractor shall comply with California Labor Code Sections 1770 to 1780, inclusive. In accordance with Section 1775, the Contractor shall forfeit as a penalty to City an amount as determined by the Labor Commissioner not to exceed $200 for each calendar day or portion thereof for each worker paid less than stipulated prevailing wage rates for such work or craft in which such worker is employed for any work done under the contract by him or by any subcontractor under it in violation of the revisions of the Labor Code and in particular, Labor Code Sections 1770 to 1780, inclusive. In addition to said penalty and pursuant to Section 1775, the difference between such stipulated prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the stipulated prevailing wage rate shall be paid to each worker by Contractor. Pursuant to the provisions of Section 1773 of DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-29 10/26/2022
the Labor Code, the City has obtained the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work applicable to the work to be done from the Director of the Department of Industrial Relations. Copies of the prevailing wage rates are on file at the City and are available for review upon request. Pursuant to §1773.2 of the Labor Code, the Contractor shall post general prevailing wage rates at a prominent place at the site of the work.

C. Payroll Records. Effective January 1, 2016, Contractor and each subcontractor shall submit electronic certified payroll records to the California Labor Commissioner in the manner and format set forth in California Labor Code Section 1771.4. The Contractor's attention is directed to the following provisions of Labor Code Section 1776. The Contractor shall be responsible for the compliance with these provisions by his subcontractors.
(a) Each contractor and subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work.

Submitted certified payrolls for hauling and delivering ready-mixed concrete and other offsite batch mixed materials must be accompanied by a written time record. The time record must include:

1. Truck driver's full name and address

2. Name and address of the factory or batching plant

3. Time the concrete was loaded at the factory or batching plant

4. Time the truck returned to the factory or batching plant • Truck driver's signature certifying under penalty of perjury that the information contained in this written time record is true and correct
(b) The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of the Contractor on the following basis:
(i) A certified copy of an employee's payroll record shall be made available for inspection or furnished to such employee or his or her authorized representative on request. (ii) A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection or furnished upon request to the City, the Division of Labor Standards Enforcement and the Division of Apprenticeship Standards of the Department of Industrial Relations.
(iii) A certified copy of all payroll records enumerated in subdivision (a) shall be made available upon request to the public for inspection or copies thereof made; provided, however, that a request by the public shall be made through either the City, the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph (2), the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the Contractor, subcontractor and the entity through which the request was made. The public shall not be given access to such records at the principal office of the Contractor.
(c) The certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement or shall contain the same information as the forms provided by the Division. (d) The Contractor shall file a certified copy of the records enumerated in subdivision (a) with the entity that requested such records within ten (10) days after receipt of a written request.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-30 10/26/2022
(e) Any copy of records made available for inspection as copies and furnished upon request to the public or the City, the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement shall be marked or obliterated in such a manner as to prevent disclosure of an individual's name, address and social security number. The name and address of the Contractor shall not be marked or obliterated.
(f) The Contractor shall inform the City of the location of records enumerated under subdivision (a), including the street address, city and City, and shall, within five working days, provide a notice of a change of location and address.
(g) In the event of noncompliance with the requirements of this Section, the Contractor shall have ten (10) days in which to comply subsequent to receipt of written notice specifying in what respects such contractor must comply with this Section. Should noncompliance still be evident after such 10- day period, the Contractor shall, as a penalty the State or the City, forfeit One Hundred Dollars ($100) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The penalties specified in subdivision (g) of Labor Code Section 1776 for noncompliance with the provisions of said Section 1776 may be deducted from any monies due or which may become due to the Contractor. (h) The Contractor and each subcontractor shall preserve their payroll records for a period of three (3) years from the date of completion of the Contract.

D. Labor Non-discrimination. Attention is directed to Section 1735 of the Labor Code which provides that Contractor shall not discriminate against any employee or applicant for employment because of race or color, religion, physical or mental disability, national origin or ancestry, medical condition, marital status or sex of such persons, except as provided in Section 12940 of the Government Code. Contractor further agrees to include a similar provision in all subcontracts, except subcontracts for standard commercial supplies or raw materials.

E. Apprentices. The Contractor and all subcontractors shall comply with the requirements of California Labor Code Sections 1777.5, 1777.6 and 1777.7 regarding the employment and of apprentices.

F. Workers' Compensation. Pursuant to the requirements of Section 1860 of the California Labor Code, the Contractor will be required to secure the payment of workers' compensation to its employees in accordance with the provisions of Section 3700 of the Labor code.

Prior to commencement of work, the Contractor shall sign and file with the City, a certification in the following form:
"I am aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract."
Said certification is included in the Contract, and signature and return of the Contract as provided in Section G3.03, "Execution of Contract," of the General Conditions, shall constitute signing and filing of the said certificate.

SECTION 7-1.02K(6) OCCUPATIONAL SAFETY AND HEALTH STANDARDS SECTION 7-1.02K(6)(B) EXCAVATION SAFETY
Add to Section 7-1.02K(6)(b) Excavation Safety as follows:

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-31 10/26/2022
Comply with Labor Code 6705 and 6707. Comply with Public Contracts Code 7104.

SECTION 7-1.02L PUBLIC CONTRACT CODE
SECTION 7-1.02L(1) GENERAL
Replace Reserved in Section 7-1.02L(1) General with the following:

1. CLAIMS PROCEDURES. Compliance with all change order procedures is a prerequisite to filing a Public Contract Code Claim pursuant to this Section. Claims must be submitted no later than (a) 30 days after the dispute resolution process set forth in Section 5-1.43 is complete or (b) 30 days after the occurrence of the event giving rise to the claim.

In accordance with the procedures set forth in Public Contract Code Sections 9204 and 20104-20104.6, a Contractor may submit a claim by registered or certified mail with return receipt requested, for one or more of the following: (a) a time extension, including, without limitation, for relief from damages or penalties for delay assessed by the City; (b) payment by the City of money or damages arising from work done by, or on behalf of, the Contractor pursuant to this contract and payment for which is not otherwise expressly provided or to which the Contractor is not otherwise entitled; or (c) payment of an amount that is disputed by the City.

The Contractor shall furnish reasonable documentation to support the claim, including but not limited to: 1) a clear, concise recital of the basis upon which the claim is asserted, including a designation of the provisions of the Contract upon which the claim is based, 2) a statement as to the amount of time and/or compensation sought pursuant to the claim; 3) whether the Contractor’s claim arises from an ongoing occurrence, and if so a description of the specific Work activities affected by the claim, 4) a time impact analysis in the event that Contractor requests a time extension, 5) full and complete cost records supporting the amount of any claim for additional compensation, and 6) a notarized certification by the Contractor as follows: “Under the penalty of law for perjury or falsification and with specific reference to the California False Claims Act, Government Code Section 12650 et seq., the undersigned hereby certifies that the information contained herein is a true, accurate and complete statement of all features relating to the claim asserted.” Failure by the Contractor to provide sufficient documentation will result in denial of the claim. The City reserves the right to request additional documentation, or clarification of the documentation provided.

Upon receipt of a claim, the City will conduct a reasonable review and provide a written statement to the Contractor identifying what portion of the claim is disputed and what portion is undisputed within 45 days of receipt of the claim. The City and Contractor may, by mutual agreement, extend the 45 day time period. For any undisputed portion of a claim, the City must make payment within 60 days of its issuance of the written statement.

If the Contractor disputes the City's written statement, or if the City fails to respond, the Contractor may demand an informal conference to meet and confer for settlement of the issues in dispute. The City will then schedule the meet and confer conference within 30 days of the demand. Within 10 business days following the meet and confer conference, the City will provide a written statement identifying the portion of the claim that remain in dispute. Any payment due on an undisputed portion of the claim will be made within 60 days of the meet and confer conference.

After the meet and confer conference, any disputed portion of the claim shall be submitted to nonbinding mediation. Alternatively, upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable. If mediation is unsuccessful, the parts of the claim that remain in dispute shall be subject to applicable procedures set forth below.

Failure of a public entity to respond to a claim within the time periods described above shall result in the claim being deemed rejected in its entirety. Additionally, amounts not paid in a timely manner shall bear interest at 7 percent per year.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-32 10/26/2022
In the event that the mediation is unsuccessful, Contractor must file a government claim pursuant to Government Code Sections 910 et seq. in order to initiate a civil action.

In any civil action filed to resolve claims, the court shall submit the matter to nonbinding mediation within 60 days following the filing or responsive pleading, provided that the parties have not already participated in mediation of the claim as outlined above. If the matter remains in dispute after nonbinding mediation, the court shall submit the matter to judicial arbitration pursuant to Code of Civil Procedure Section 1141.10 et seq.

If the matter remains in dispute after judicial arbitration, the City or the Contractor may request a trial de novo.

2. UTILITY RELOCATION. Pursuant to California Government Code Section 4215, if during the course of the work the Contractor encounters utility installations which are not shown or indicated in the contract plans or in the specifications or which are found in a location substantially different from that shown, and such utilities are not reasonably apparent from visual examination of the work site, then it shall promptly notify the City in writing. Where necessary for the work of the Contract, the City will amend the contract to adjust the scope of work and the compensation to allow the Contractor to make such adjustment, rearrangement, repair, removal, alteration, or special handling of such utility, including repair of the damaged utility. If the Contractor fails to give the notice specified above and thereafter acts without instructions from the City, then it shall be liable for any or all damage to such utilities or other work of the Contract which arises from its operations subsequent to the discovery, and it shall repair and make good such damage at its own cost.

3. PUBLIC WORKS REGISTRATION. The Contractor must be registered with the California Department of Industrial Relations pursuant to Labor Code Section 1725.5. This Contract is subject to monitoring and enforcement by the DIR pursuant to Labor Code Section 1771.4. The Contractor shall furnish the records specified in Labor Code Section 1776 directly to the Labor Commissioner, monthly in a format prescribed by the Labor Commissioner.

4. USE OF SUBCONTRACTORS. Contractor shall not subcontract any work to be performed by it under this Contract without the prior written approval of the City. Contractor shall be solely responsible for reimbursing any subcontractors and City shall have no obligation to them. Attention is directed to the requirements of Sections 4100 to 4113, inclusive, of the California Public Contract Code which are applicable to this Contract.

Each Contractor shall list the name and business address of each subcontractor to whom the Contractor proposes to subcontract a portion of the work in an amount in excess of one-half of one percent (0.5%) of the Total Contract Price, along with a description of the portion of the work which shall be done by each subcontractor, by executing the “List of Subcontractors” form attached to this Contract

5. CONTRACTOR’S LICENSE REQUIREMENTS. Contractor and any approved subcontractors shall hold such current and valid Contractor’s Licenses as required by California Law.

6. NON-COLLUSION DECLARATION. Pursuant to Public Contract Code Section 7106, Contractor shall execute a Non-Collusion Declaration, in a form provided by City, which is attached and incorporated herein.

7. EXCAVATION. If applicable, in accordance with state law (Public Contract Code Section 7104), with respect to any work involving digging trenches or excavations that extend deeper than four feet, the Contractor shall notify the City promptly in writing of any of the following conditions: (a) material that the Contractor believes may be hazardous waste, as defined in California Health and Safety Code Section 25117, that is required to be removed to a Class I, Class II or Class III disposal site in accordance with provisions of existing law; (b) subsurface or latent physical conditions at the site differing from those indicated; (c) unknown physical conditions at the site of any unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract. Contractor shall notify the City of such conditions prior to disturbing them and shall await direction from the City as to how to proceed.

8. TRENCH SAFETY. For all contracts over $25,000, excavation for any trench 5 feet or more in depth shall not begin until the Contractor has received approval from the City, of the Contractor’s detailed plan for DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-33 10/26/2022
worker protection from the hazards of caving ground during the excavation of such trench. Such plan shall be submitted at least 5 days before the Contractor intends to begin excavation for the trench and shall show the details of the design of shoring, bracing, sloping or other provisions to be made for worker protection during such excavation. No such plan shall allow the use of shoring, sloping or a protective system less effective than that required by the Construction Safety Orders of the Division of Industrial Safety; and if such plan varies from the shoring system standards established by the Construction Safety Orders, the plan shall be prepared and signed by an engineer who is registered as a Civil or Structural Engineer in the State of California. Attention is directed to the provisions of Section 6705 of the Labor Code concerning trench excavation safety plans.

9. SOUND CONTROL REQUIREMENTS. The Contractor shall comply with all State and local sound control and voice level rules, regulations and ordinances which apply to any work performed pursuant to the contract.

Each internal combustion engine, used for any purpose on the job or related to the job, shall be equipped with a muffler of a type recommended by the manufacturer. No internal combustion engine shall be operated on the project without said muffler.

General construction noise shall be limited to weekdays from 7:00 am to 6:00 pm. Pile Driving and similarly loud activities shall be limited to weekdays from 8:00 am to 5:00 pm.

Pre-construction noise including, but not limited to loading and unloading, cleaning of mechanical toilets, maintenance of vehicles, deliveries, truck idling, backup beeps, yelling and radios, is also limited to the general construction noise hours.

The Director may allow construction noise to occur beyond the general construction noise hours provided a noise waiver is granted pursuant to the Emeryville Municipal Code.

Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore.

10. PRESERVATION OF PROPERTY. Attention is directed to Section 7 1.12, "Indemnification and Insurance," and to Section 8 1.10, "Utility and Non-Highway Facilities." Due care shall be exercised to avoid injury to existing highway improvements or facilities, utility facilities, adjacent property, and roadside trees, shrubs and other plants that are not to be removed.

Roadside trees, shrubs and other plants that are not to be removed, and pole lines, fences, signs, markers and monuments, buildings and structures, conduits, pipelines under or above ground, sewer and water lines, all highway facilities and any other improvements or facilities within or adjacent to the highway shall be protected from injury or damage, and if ordered by the Engineer, the Contractor shall provide and install suitable safeguards, accepted by the Engineer, to protect the objects from injury or damage. If the objects are injured or damaged by reason of the Contractor's operations, the objects shall be replaced or restored at the Contractor's expense. The facilities shall be replaced or restored to a condition as good as when the Contractor entered upon the work, or as good as required by the Specifications accompanying the Contract, if any of the objects are a part of the work being performed under the Contract. The Engineer may make or cause to be made those temporary repairs that are necessary to restore to service any damaged highway facility. The cost of the repairs shall be borne by the Contractor and may be deducted from any moneys due or to become due to the Contractor under the Contract.

11. PAYMENT BOND. For all contracts over $25,000, the successful Bidder shall provide a payment bond in the amount equal to one hundred percent (100%) of the Total Contract Price and issued by a California admitted surety. The payment bond shall provide the City with security for Contractor’s full payment to all subcontractors for costs of materials, equipment, supplies, and labor furnished in the course of the performance DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-34 10/26/2022
of the Contract. Full compensation for furnishing the payment bond is included in the Total Contract Price.

12. RETENTION OF PROGRESS PAYMENTS. The City may retain five percent (5%) of the estimated value of the work done and five percent (5%) of the value of materials estimated to have been furnished and delivered and unused or furnished and stored as part security for the fulfillment of the Contract by the Contractor. Any time after fifty percent (50%) of the work has been completed, if the City finds that satisfactory progress is being made, the City may make any of the remaining progress payments in full for actual work completed in accordance with Public Contract Code Section 9203.

13. SECURITIES IN LIEU OF RETENTION. Pursuant to Public Contract Code Section 22300, the Contractor may elect, in lieu of having progress payments retained by the City, to deposit in escrow with the City, or with a bank acceptable to the City, securities eligible for investment under Government Code Section 16430, bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the Contractor and the City. If the Contractor elects to submit securities in lieu of having progress payments retained by the City, the Contractor shall, at the request of any subcontractor performing more than 5% of the Contractor’s total bid, make the same option available to the subcontractor.

14. PROMPT PAYMENT TO CONTRACTOR. The City will make progress payments within thirty (30) days after receipt of an undisputed and properly submitted progress payment invoice pursuant to Section 20104.50 of the Public Contract Code. No such payment will be made when, in the judgment of the Project Manager, (a) the work is not proceeding in accordance with the provisions of the Contract; (b) the Contractor is not complying with the requirements of the Contract; or (c) when the total value of the work done as shown on the invoice does not exceed Three Hundred Dollars ($300.00). No such invoice or payment will be construed to be an acceptance of any work or materials. Before any progress payment or the final payment is made, the Contractor may be required to submit satisfactory evidence that he is not delinquent in payments to its employees, subcontractors, suppliers or other creditors for labor and materials incorporated into the work.

Pursuant to Public Contract Code Section 20104.50, if the City fails to make a progress payment in a timely manner, it shall pay interest to the Contractor at the legal rate set forth in Section 685.010(a) of the California Code of Civil Procedure.

15. PROHIBITION AGAINST CONTRACTING WITH DEBARRED SUBCONTRACTORS. Contractor is prohibited from performing work on a public works project with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code.

16. THIRD-PARTY CLAIMS. Pursuant to Public Contracts Code Section 9201, City shall have full authority to compromise or otherwise settle any claim relating to the Contract at any time. City shall provide for timely notification to Design-Builder of the receipt of any third-party claim, relating to the contract. Notice shall be in writing and will be provided within thirty (30) days.

17. IRAN CONTRACTING ACT. The undersigned Bidder certifies that it is not, at the time of bidding, on the California Department of General Services (DGS) list of persons determined to be engaged in investment activities in Iran or otherwise in violation of the Iran Contracting Act of 2010 (Public Contract Code Section 2200- 2208).

18. ANTITRUST CLAIMS. The Contractor's attention is directed to the following provision of Public Contract Code Section 7103.5(b) which shall be applicable to the Contractor and its subcontractors:
"In entering into a public works contract or a subcontract to supply goods, services or materials pursuant to a public works contract, the Contractor or subcontractor offers and agrees to assign to the awarding body all right, title and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-35 10/26/2022
materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties."

19. RECORDS. Pursuant to Government Code Section 8546.7, Contractor shall retain all project-related records for a period of five (5) years after final payment on this Contract, which shall be subject to audit or inspection by the City, ACTC or the State Auditor during this period.

Separate and apart from the obligations under Section 8546.7, the City shall have the right to audit project records at City discretion under the following circumstances: (a) submission of a Public Records Act request regarding the project; (b) inability to resolve a disputed contract change order; or (c) submission of a construction claim.

20. TRADE NAMES AND ALTERNATIVES. For convenience in designation in the Contract Documents, certain articles or materials to be incorporated in the work may be designated under a trade name or the name of a manufacturer and its catalog information. Except in those instances where the product is designated to match others in use in a particular improvement, either completed or in the course of completion, the use of an alternative article or material which is of equal quality and of the required characteristics for the purpose intended may be permitted, subject to the following requirements:
a. The Contractor shall submit its Bid for an alternative in writing. Such request shall be made in ample time to permit review and approval without delaying the work. b. No such Bid will be considered unless accompanied by complete information and descriptive data necessary to determine the equality of the offered materials, articles, or equipment.

Samples shall be provided when requested by the Project Manager. The Contractor shall satisfy the Project Manager as to the comparative quality, suitability or performance of the offered materials, articles or equipment. In the event that the Project Manager rejects the use of such alternative materials, articles or equipment, ("material") then one of the particular products designated by brand name will be furnished.
c. The burden of proof as to the quality and suitability of alternatives shall be upon the Contractor and he shall furnish all information necessary as required by the Project Manager. The Project Manager shall be the sole judge as to the quality and suitability of alternative articles, equipment or materials and its decisions shall be final. Where use of an alternative material, article or equipment involves redesign of, or changes to, other parts of the work, the cost and the time required to effect such redesign or changes will be considered in evaluating the suitability of the alter-native material, article or equipment. Cost of redesign by the Project Manager will be borne by the Contractor.
d. Whenever classification, rating or other certification by a body such as UL or NEMA is a part of the specification for any material, proposal for use of alternative materials shall be accompanied by reports from the listed or equivalent recognized and industry accepted independent testing laboratory indicating compliance with specification requirements. The cost of all testing required to prove equality of the material proposed shall be borne by the Contractor. Approval of an alternative material shall be only for the characteristics or use named in such approval and shall not be used to change or modify any Contract requirement.

21. PERMITS AND LICENSES. The Contractor shall procure all permits and licenses (including OSHA permits pursuant to Labor Code Section 6500), pay all charges and fees, and give all notices necessary and incident to the due and lawful prosecution of the work.

The Environmental Quality Act (Public Resources Code, Section 21000 to 21176) may be applicable to permits, licenses and other authorizations which the Contractor must obtain from State or local agencies in connection with performing the work of the Contract. The Contractor shall comply with the provisions of that Act in obtaining such permits, licenses and other authorizations and they shall be obtained in sufficient time to prevent delays to the work.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-36 10/26/2022
The Contractor shall comply with permits obtained by the City, if any, for the work.

SECTION 7-1.03 PUBLIC CONVENIENCE
Add to end of Section 7-1.03 Public Convenience as follows:

Public traffic includes all:

1. motorized vehicles

2. bicycles

3. pedestrian traffic

4. personal mobility devices.

Areas modified by you for use by pedestrians must provide adequate accessibility to meet Americans with Disabilities Act (ADA) requirements. Where walkways are damaged, alternate walkways must be placed around the work site or other materials may be used to allow use of the area. Where plywood is used it must be a minimum of ¾ inch in thickness and beveled at the ends to prevent tripping, fastened down to prevent shifting and supported underneath as needed to prevent bowing. The Engineer may require cold mix to be placed to transition walkway to plywood.

Sidewalks must not be blocked without providing alternative path(s) of travel. Where excavations in pedestrian walkways are minor and do not restrict pedestrian walking area or create a hazard to the pedestrian, structurally sound walkways with safety railings must be provided over or around the excavated area. All walkway areas must comply with the Americans with Disabilities Act.

Where sidewalk and bike path facilities exist, a minimum width of four feet must be maintained at all times a must provide for a safe passage through the work area. At no time will pedestrians be diverted into a portion of the street used concurrently for motorized traffic. At locations where adjacent alternate walkways are not practical, the Engineer may approve sidewalk closures. Appropriate signs and barricades must be installed at the limits of construction and in advance of the closure at the nearest crosswalk or intersection to divert pedestrians across the street.

Provisions must be made to accommodate existing transit routes and stops. You must notify the Engineer at least 72 hours in advance of any work that will require rerouting or delay of a transit line or school bus. You must post any transit stop affected by the rerouting at least 48 hours in advance at the affected transit stop identifying the affected routes, days, and times.

Furnish the Engineer and utility companies with the names, addresses and telephone numbers of two individuals, before starting work that can be reached in case of emergency, 24 hours a day, throughout the duration of the job. These emergency contacts must be able to provide on-site response within one hour.

Do not close streets to traffic without written permission from the Engineer. However, in the absence of the Engineer, if the necessity for closing a street is absolute to prevent immediate danger to the public, you must immediately notify the:

1. Engineer

2. Police Department

3. Fire Department.

Provide access to and from all property adjacent to the work area where normal access existed prior to your work.

All:

1. traffic lanes

2. driveways

3. sidewalks
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-37 10/26/2022

4. street crossings

5. primary business entrances
must be usable at the end of the work day.

Add between the 9th and 10th paragraphs of Section 7-1.03 Public Convenience the following:

If a height differential of more than 0.04 foot is created by construction activities at a joint transverse to the direction of traffic on the traveled way or a shoulder subject to public traffic, construct a temporary taper at the joint with a slope complying with the requirements shown in the following table:

Temporary Tapers
Height
differential
Slope (horizontal:vertical)
Taper use of 14 days or less Taper use of more than 14 days Greater than 0.08 100:1 or flatter 200:1 or flatter

0.04–0.08 70:1 or flatter 70:1 or flatter
For a taper on existing asphalt concrete or concrete pavement, construct the taper with minor HMA under Section 39-2.07.

Grind existing surfaces to accommodate a minimum taper thickness of 0.10 foot under either of the following conditions:

1. HMA material such as rubberized HMA, polymer-modified bonded wearing course, or open-graded friction course is unsuitable for raking to a maximum 0.02 foot thickness at the edge

2. Taper will be in place for more than 14 days.

For a taper on a bridge deck or approach slab, construct the taper with polyester concrete under Section 60-3.04B.

The completed surface of the taper must be uniform and must not vary more than 0.02 foot from the lower edge of a 12-foot straightedge when placed on its surface parallel and perpendicular to traffic.

If authorized, you may use alternative materials or methods to construct the required taper.

SECTION 7-1.03A PUBLIC NOTIFICATION
Add Section 7-1.03A Public Notification as follows:

In consultation with the Engineer, Contractor shall prepare and deliver notices to City regarding various stages of the work, including but not limited to initial start of the work, quarterly updates of work progress, and notification of work activities creating excessive noise, vibration and other disturbing qualities, for notification to properties adjacent to the work area. The notice must include:

1. a brief description of the work

2. date the work will start

3. date the work will end

4. potential impacts on the adjacent property

5. company representative’s name

6. company representative’s phone number where they can be reached or a message can be left.

Company representative must respond to all phone calls received within 24 hours of receipt with the requested information. Contractor shall provide notices to Engineer at least 72 hours in advance of the work. The Engineer must review and approve notice wording. Upon approval of notices by Engineer, Contractor shall distribute said notices to properties adjacent to the work area.

Attention is directed to Government Code Sections 4216 to 4216.9, and in particular Section 4216.2 which provides, in part:

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-38 10/26/2022
"Except in an emergency, every person planning to conduct any excavation shall contact the appropriate regional notification center at least two working days, but no more than 14 calendar days, prior to commencing that excavation, if the excavation will be conducted in an area which is known, or reasonably should be known, to contain subsurface installations other than the underground facilities owned or operated by the excavator, and, if practical, the excavator shall delineate with white paint or other suitable markings the area to be excavated . . . .The regional notification center shall provide an inquiry identification number to the person who contacts the center and shall notify any member, if known, who has a subsurface installation in the area of the proposed excavation."
Contractor shall contact the regional notification center, “Underground Service Alert," and schedule the work to allow ample time for the center to notify its members and, if necessary, for any member to field locate and mark its facilities.
7-1.03A(1) Street Maintenance
Add Section 7-1.03A(1) as follows:

Street maintenance activities, including:

1. overlays

2. reconstruction

3. slurry seal

4. micro-surfacing

5. other surfacing or seal coats
require you notify all residents and businesses within 300 feet or one block (whichever is a greater distance) of the work areas between three and five days in advance of the work. This notification must be in the form of a door hanger which is to be hand-delivered or placed on the front door of each business or residence. A sample door hanger is included in the appendix of the engineering standards.

SECTION 7-1.03A(1) STREET CLOSURE
Add Section 7-1.03A(1) Street Closure as follows:

Where street closures are allowed either under the conditions of the special provisions or by separate authority of the Engineer, comply with the following conditions.

By noon Monday, submit a written schedule of planned closures for the following week period, defined as Friday noon through the following Friday noon.

The street closure schedule must show the:

1. locations

2. dates

3. times
of the proposed street closures. Street closure schedules submitted to the Engineer with any:

1. incomplete

2. unintelligible

3. inaccurate information
will be returned for correction and resubmittal. The Engineer will review and approve or return for corrections the street closure schedule. You may be required to coordinate with other parties as a condition of approval of the street closure schedule.

Provide notification of the street closure to:

1. police dispatch
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-39 10/26/2022

2. bus services

3. garbage company

4. affected properties as described above.

Immediately notify the Engineer if a scheduled street closure will not take place. Amendments to the street closure schedule, including adding additional closures, must be submitted to the Engineer for review and approval, and must be done in writing at least three working days in advance of a planned street closure.

Approval of amendments to the street closure schedule will be at the discretion of the Engineer. Approved closures that are cancelled due to unsuitable weather may be rescheduled at the discretion of the Engineer for the following working day.

Public traffic may only be restricted during those times when work is actually underway.

SECTION 7-1.03A(2) NO PARKING
Add Section 7-1.03A(2) No Parking as follows:

Place "No Parking" signs at least 24 hours before beginning of work. In areas where vehicles may be in the way of construction, place and request the Police Department to verify “No Parking” signs at least 30 hours prior to the beginning of work to allow for the legal time required for notification prior to removing a vehicle.

Do not place “No Parking“ signs more than five days in advance of the anticipated work without prior approval from the Engineer.

If no work is performed for five consecutive days, remove the “No Parking” signs and repost as stated above prior to the start of work.
“No Parking” signs must specify the following:

No Parking
Construction Zone
Tow Away
Per Municipal Code EMC 4-9.17(f)
Date: XXXXX to XXXXXX
Time: XXXXX to XXXXXX
Contractor:

Contractor Office Number:

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-40 10/26/2022
SECTION 7-1.03B TRAFFIC CONTROL PLAN
Add Section 7-1.03B Traffic Control Plan as follows:

Submit to the Engineer a traffic control plan for review and approval by the Engineer prior to any construction activities starting. Submit separate traffic control plans for each phase of the work requiring a change in traffic control. Allow a minimum of five working days for review of the submitted traffic control plan and five working days for review of any resubmitted plans. Do not begin work until the traffic control plan is approved by the Engineer.

Limited work hours may be imposed at any time. If the work impacts traffic flow on any:

1. major route, or

2. in the vicinity of schools, or

3. in the Pedestrian Priority Zone per figure 3-1 of the City’s General Plan, expect that work hour restrictions will be imposed by the Engineer.

Do not restrict the public right-of-way roadway without an approved traffic control plan. The Engineer must review the implemented traffic control for compliance with the approved traffic control plan, prior to the start of any work.

Provide adequate width to allow a bike lane adjacent to the travel lane or provide clear posting that the bicycle lane is closed.

Do not place traffic control devices or construction equipment in bike lanes or in sidewalk such that they are blocked, as determined by the Engineer, when these facilities are open for use.

SECTION 7-1.04 PUBLIC SAFETY
Replace 15th paragraph of Section 7-1.04 Public Safety with:

Notify the Engineer not less than five days and not more than 40 days before the anticipated start of an activity that will change the vertical or horizontal clearance available to traffic, including shoulders.

SECTION 7-1.06 INSURANCE
SECTION 7-1.06B CASUALTY INSURANCE
SECTION 7-1.06G DEDUCTIBLES
SECTION 7-1.06I SELF INSURANCE PROGRAM
Delete Sections 7-1.06B Casualty Insurance, 7-1.06G Deductibles and 7-1.06I Self Insurance Program.

SECTION 7-1.11 FEDERAL LAWS FOR FEDERAL-AID CONTRACTS
SECTION 7-1.11A General
Add between the 1st and 2nd paragraphs of Section 7-1.11A General as follows:

Comply with 46 CFR 381.7(a)–(b).
7-1.12 Indemnification and Insurance
The Contractor's obligations regarding indemnification of the City and the requirements for insurance shall conform to the provisions set forth in the Contract.
7-1.13 Acceptance of Contract
When the Engineer has made the final inspection as provided in Section 5 1.46, "Final Inspection and Contract Acceptance," and determines that the Contract work has been completed in all respects in accordance with the DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-41 10/26/2022
Contract Documents, the Engineer will recommend that the City Council formally accept the Work as complete.

Upon acceptance of the Contract as complete by the City Council, the said Council shall cause a Notice of Completion to be filed and recorded in the records of the Alameda County Recorder's Office. 7-1.14 Sanitary Provisions
Contractor shall conform to the rules and regulations pertaining to sanitary provisions established by the City. Toilets for use of employees on the work shall be furnished where needed and shall be maintained by Contractor. Their use shall be strictly enforced.
7-1.15 Third Party Claims
A. Pursuant to Public Contract Code Section 9201, City shall have full authority to compromise or otherwise settle any claim relating to the Contractor at any time.

B. City shall provide for timely notification to the Contractor of the receipt of any third–party claim relating to the contract. Notice shall be in writing and will be provided within (30) days.

C. City shall be entitled to recover its reasonable costs incurred in providing the notification required by subdivision (b).

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-42 10/26/2022
8 PROSECUTION AND PROGRESS
The Bidder's attention is directed to the provisions in Division I, Section 8, Prosecution And Progress, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 8, Prosecution And Progress, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 8-1.02 SCHEDULE
SECTION 8-1.02A GENERAL
Replace Section 8-1.02A General with the following:

Submit the type of schedule specified in the special provisions. If no type is specified, submit a Level 1.

Submittal of a Schedule is not acceptance. The Engineer will accept the schedule upon review and determination of its compliance with Contract terms and City needs. The schedule will not relieve you of the responsibility for accomplishing the all the work in compliance with the contract.

You agree by submission of a bid, that the work can be completed within contract duration and working hour restrictions.

The Engineer will not accept a schedule which shows a project completion date in excess of the contract time duration. No progress payments will be paid until the Engineer has approved the project schedule.

Float time shown on the approved project schedule is not for exclusive use or benefit of either you or the Engineer. Float time is available for use by either you or the Engineer whoever needs it first in order to:

1. minimize the impact of project problems

2. delays

3. changes in the work.

You agree that float time may be used by the Engineer to resolve project problems. You agree that there will be no basis for any modification of the

1. project milestone dates

2. an extension of the contract time

3. a claim for additional compensation
as a result of any:

1. project problem

2. change orders

3. delay
that only results in the loss of available float on the project schedule.

On a monthly basis prior to application for payment, you must arrange a meeting with the Engineer to review your updated project schedule. Updates must include accurate progress data and be based upon your best judgment. Updates must be made to the project schedule in consultation with all subcontractors and suppliers.

SECTION 8-1.03 PRECONSTRUCTION CONFERENCE
Replace Section 8-1.03 Preconstruction Conference with the following:

The City will execute the Contract with the successful Bidder upon receipt of:

1. bonds
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-43 10/26/2022

2. insurance

3. signed Contract.

The Engineer will set a date for the pre-construction conference. The pre-construction conference will take place within 15 working days of the execution of the Contract by the City. Attendance by your representative is required.

SECTION 8-1.04 START OF JOB SITE ACTIVITIES
SECTION 8-1.04B STANDARD START
Replace Section 8-1.04B Standard Start with the following:

The Contract time, as stated in the special provisions, will begin on the date specified in the notice to proceed, generally the second Monday following the pre-construction conference. Work must commence within ten working days from the start of contract time. Failure to start work within the allotted time period, without written approval of the Engineer, is considered abandonment of the work and the Engineer may terminate your control over the work in compliance with Section 8-1.13.

Work must be diligently prosecuted to completion before the expiration of the Contract time provided in the special provisions, beginning on, and including, the start date given in the notice to proceed.

Do not start job site activities until the City authorizes or accepts your submittal for:

1. CPM baseline schedule

2. WPCP or SWPPP, whichever applies

3. Notification of DRA nominee and disclosure statement

4. Contingency plan for opening closures to traffic

5. Other submittals as called out in these Specifications.

You may enter the job site only to measure controlling field dimensions, take photos or videos, and locate utilities.

Do not start other job site activities until all the submittals from the above list are authorized or accepted and the following information is received by the Engineer:

1. Notice of Materials To Be Used form.

2. Written statement from the vendor that the order for structural steel has been received and accepted by the vendor. The statement must show the dates that the materials will be shipped.

You may start job site activities before the 20th day after Contract approval if you:

1. Obtain specified authorization or acceptance for each submittal before the Specified Date in the Notice to Proceed

2. Receive authorization to start.

Submit a notice 72 hours before starting job site activities. If the project has more than 1 location of work, submit a separate notice for each location.

SECTION 8-1.05 TIME
Replace Section 8-1.05 Time with the following:

You must complete all of the work called for under the Contract within the time set forth in the special provisions.

You must complete any designated portion of the project within the time as shown or specified.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-44 10/26/2022
Determination that a day is a non-working day by reason of inclement weather or conditions resulting therefrom will be made by the Engineer.

The Engineer will provide the status of working days on the monthly progress payment, including:

1. total days

2. days used

3. days remaining.

You are responsible to verify the days are correctly shown on the pay estimate. If you believe an error has been made, notify the Engineer in writing within 15 days of receipt of the pay estimate, or the status of days is deemed accepted as correct.

Complete all work including punch list items before the expiration of the Contract time.

Monthly status of working days will only be provided when working days are being charged and monthly payment is due to you.

SECTION 8-1.06 SUSPENSIONS
Replace Section 8-1.06 Suspensions with the following:

The Engineer may suspend work wholly or in part due to conditions unsuitable for work progress. Provide for public safety and a smooth and unobstructed passageway through the work zone during the suspension in compliance with Sections 7-1.03 and 7-1.04.

The Engineer may suspend work wholly or in part due to your failure to:

1. fulfill the Engineer's orders

2. fulfill a Contract part

3. perform weather-dependent work when conditions are favorable so that weather-related unsuitable conditions are avoided or do not occur.

The Engineer may provide for a smooth and unobstructed passageway through the work during the suspension and deduct the cost from payments. No time adjustment will be made for the suspension.

Upon the Engineer's order of suspension, suspend work immediately. Resume work when ordered.

SECTION 8-1.07 DELAYS
SECTION 8-1.07C PAYMENT ADJUSTMENTS
Replace 1st paragraph in Section 8-1.07C Payment Adjustments with the following:

For an excusable delay that affects your costs, the City may make a payment adjustment.

The City does not make a payment adjustment for overhead incurred during non–working days that extend the Contract into an additional construction season.

SECTION 8-1.10 LIQUIDATED DAMAGES
Replace the 3rd and 4th paragraph of Section 8-1.10A Liquidated Damages with the following:

Liquidated Damages in the Amount of $1,500 per calendar day will be assessed for failure to complete the contract work within the number of workdays specified.

SECTION 8-1.10B FAILURE TO COMPLETE WORK PARTS WITHIN SPECIFIED TIMES SECTION 8-1.10B(1) FAILURE TO COORDINATE SIGNAL TURN-ONS, STRIPING AND SIGNING DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-45 10/26/2022
Add 8-1.10B(1) Failure To Coordinate Signal Turn-Ons, Striping And Signing as follows:

If signal turn-on, road striping, and signing are not coordinated as required by the project specifications, damage will be sustained by the City and its residents. Since it is and will be impractical to determine the actual damage which the City and its residents will sustain by reason of your failure to comply with the project specifications, it is agreed that you will pay to the City the sum of $500 per day for each:

1. day that you fail to stripe the road

2. day that you fail to install required signs after the third day after a signal is turned on

3. day that you fail to turn on a signal after the second day after striping the road

4. day that you fail to remove signs which conflict with new striping

5. day that you fail to install signs as shown or specified.

SECTION 8-1.14 F TERMINATION OF CONTROL
Add Section 8-1.14F as follows:

Whenever, in the opinion of the City , the Contractor has failed to supply an adequate force of labor, equipment, or materials of proper quality, or has failed in any other respect to prosecute the work with the diligence specified in the Contract; or if Contractor should refuse or fail to comply with laws, ordinances, or directions of the Engineer; or if Contractor should fail to make prompt payments to subcontractors or for labor or materials; or otherwise be in breach of this Contract; the City may give written notice of at least five (5) calendar days to the Contractor and Contractor's sureties that if the defaults are not remedied within a time specified in such notice, the Contractor's control over the work will be terminated.

If the Contractor should be adjudged as bankrupt or make an assignment for the benefit of Contractor's creditors, or if a receiver should be appointed on account of Contractor’s insolvency, the City may declare the Contractor's control over the work terminated, and so notify the Contractor and Contractor’s sureties.

Upon such termination, the City may take possession, and use all or any part, of the Contractor's materials, tools, equipment, and appliances upon the premises to complete the work; the City assuming responsibility for the final relinquishment of such equipment at the conclusion of the work, or sooner, at its option, in as good condition as when it was taken over, reasonable wear and tear excepted; and the City agrees to pay for such materials and the use of said equipment at a reasonable compensation.

If the Contractor's control over the work is terminated as provided above, the Contractor is not entitled to receive any portion of the amount to be paid under the Contract until it is fully completed. After completion, if the unpaid balance exceeds the sum of the amount expended by the City in finishing the work, plus all damages sustained, or to be sustained, by the City, plus any unpaid claims on account of labor, materials, tools, equipment, or supplies contracted for by the Contractor for the work herein contemplated, the excess not otherwise required by these Contract Documents to be retained shall be paid the Contractor.

The City reserves the right to terminate the work for its convenience upon written notice to Contractor. In such event, the Contractor shall be paid its reasonable costs for that portion of the work performed to the date of termination, reasonable costs associated with demobilization, plus fifteen percent (15%) of all such costs for overhead and profit.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-46 10/26/2022
9 PAYMENT
The Bidder's attention is directed to the provisions in Division I, Section 9, Payment, of the Caltrans Standard Specifications, 2015, as modified by these special provisions as set forth below for the requirements and conditions which he/she must observe in the preparation of the proposal form and the submission of the bid.

Replace, Delete or Add to Division I, Section 9, Payment, of the Caltrans Standard Specifications, 2015, as follows:

SECTION 9-1.02A GENERAL
Add to Section 9-1.02A General as follows:

Final pay item quantities are designated with an “(F)” in the bid item list.

SECTION 9-1.03 PAYMENT SCOPE
Add to Section 9-1.03 Payment Scope as follows:

When the Engineer does not retain a portion of the funds during the prosecution of the work, as required on federally funded projects, you may not retain a portion of the funds due to subcontractors when making progress payments.

The City does not pay interest on progress payment retentions.

Your bid prices include all items of work and materials as shown and called out in the project special provisions necessary to complete all the work. The contract prices for doing the work include full compensation for furnishing all:

1. labor

2. materials

3. tools

4. equipment

5. incidentals
to complete the work.

Any items of work that does not have a separate pay item is considered included in other items cost of work and no additional compensation will be paid.
9-1.04 FORCE ACCOUNT
9-1.04A GENERAL
Add to Section 9-1.04A General as follows:

When force account or extra work is in dispute, you must still review your daily work report for the disputed work with the Engineer every day. The daily work must be signed by the Engineer daily to verify that your report has been reviewed. Final determination as to whether the work is included in the contract work or is extra work, may be decided after the work is completed.

SECTION 9-1.04B LABOR
Add to Section 9-1.04B Labor as follows:

For the purposes of calculating the cost of extra work or force account payment:

1. owner

2. superintendents
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-47 10/26/2022

3. other salaried employees
performing work on the project must be billed at the prevailing wage corresponding to the type of work performed as shown in the current labor rate publication.

SECTION 9-1.04D EQUIPMENT RENTAL
SECTION 9-1.04D(1) GENERAL
Add to Section 9-1.04D(1) General as follows:

You must submit a list of equipment anticipated to be used on the project and the associated Caltrans equipment rental rate. If there is no established rate for equipment planned to be used, furnish that information to the Engineer. Provide equipment submittal with Caltrans rates at the pre-construction conference. The most current Caltrans equipment rental rate publication at the date of contract award will be used for the entire project.

SECTION 9-1.07 PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS Delete Section 9-1.07
SECTION 9-1.16 PROGRESS PAYMENTS
SECTION 9-1.16A GENERAL
Replace Section 9-1.16 with:

The City, once in each month, shall cause an estimate in writing to be made by the Engineer. The estimate shall include the total amount of work done and acceptable materials furnished, provided the acceptable materials are listed as eligible for partial payment as materials in the special provisions and are furnished and delivered by the Contractor (provided that the Contractor furnishes evidence satisfactory to the Engineer that the materials are stored in an area subject to or under the control of the City, to the time of the estimate, and the value thereof). The estimate shall also include any amounts payable for mobilization. Daily extra work reports furnished by the Contractor less than 5 calendar days, not including Saturdays, Sundays and legal holidays, prior to the preparation of the monthly progress estimate shall not be eligible for payment until the following month's estimate.

The amount of any material to be considered in making an estimate will in no case exceed the amount thereof which has been reported by the Contractor to the Engineer on City approved forms, properly filled out and executed, including accompanying documentation as therein required, less the amount of the material incorporated in the work to the time of the estimate. Only materials to be incorporated in the work will be considered. The estimated value of the material established by the Engineer will in no case exceed the Contract price for the item of work for which the material is furnished.

Contractor shall submit to Engineer an itemized application for payment for the cost of the work in permanent place, which has been completed in strict accordance with the Contract Documents as of the last day of the preceding month, less amounts previously paid. The application for payment shall be prepared in a form acceptable to the Engineer and shall contain itemized amounts in accordance with the Contract Documents. The applications for payment shall not include requests for payment on account of changes which have not been authorized by Change Orders, or for amounts Contractor does not intend to pay a subcontractor because of a dispute or other reason.

If requested by the City, an application for payment shall be accompanied by a summary showing payment that will be made to subcontractors covered by such application, and unconditional waivers and releases of claims and stop notices, from each subcontractor listed in the preceding application for payment covering sums disbursed pursuant to that preceding application for payment.

Contractor warrants that upon submittal of an application for payment, all work has been performed in strict compliance with the Contract Documents, and all work for which certificates of payment have been previously DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-48 10/26/2022
issued and payment has been received from City, shall be free and clear of all claims, stop notices, security interests, and encumbrances in favor of Contractor, subcontractors or other persons or firms entitled to make claims by reason of having provided labor, materials, or equipment related to the work.

Payment of all, or any part, of an application for payment may be withheld, a certificate of payment may be withheld, all or part of a previous certificate for payment may be nullified and that amount withheld from a current certificate for payment, or the City may withhold from payment, on account of any of the following:

1. Defective work not remedied;

2. Third-party claims against Contractor or City arising from the acts or omissions of Contractor or subcontractors;

3. Stop Notices;

4. Failure of Contractor to make timely payments due to subcontractors for material or labor;

5. Damage to the City or others for which Contractor is responsible;

6. Failure of Contractor to maintain, update, and submit record documents;

7. Failure of Contractor to submit schedules or their updates as required by the Contract Documents;

8. Performance of the work by Contractor without properly processed shop drawings; 9 Liquidated damages assessed;

10. Any other failure of Contractor to perform its obligations under the Contract Documents.

The request for a progress payment shall be turned into the City by the 20th of each month and the City shall process payment to be ready by the 20th of the following month. Pursuant to Public Contract Code Section 20104.50, if City fails to make a progress payment in a timely manner, it shall pay interest to Contractor at the legal rate set forth in the Code of Civil Procedure Section 685.010(e). Upon payment of a progress invoice, the City is hereby granted title and ownership to all work in progress, drawings, materials, equipment, machinery, fittings, items of outfit and furnished goods invoiced for as required by this Agreement, which shall be free of encumbrances.

Add to Section 9-1.16A General as follows:

Items Contractor wants Engineer to be eligible for progress payment even if they are not incorporated into the work shall be determined with a written change order.

Progress payments will provide you compensation for work and eligible materials through the last day of the month. No progress payment will be made when the work is not proceeding in compliance with the contract or when the total value of the work done since the last progress payment is less than $1000, as determined by the Engineer.

SECTION 9-1.16C MATERIALS ON HAND
Replace Section 9-1.16C Materials on Hand with the following:

Materials on hand but not incorporated into the work are eligible for progress payment of fifty percent (50%) of the value of the materials furnished and delivered and unused. For materials to be eligible for progress payment:

1. the cost of the materials must be greater than $20,000

2. an invoice is provided for the material clearly showing the material is for this current work and cost

3. the material is stored in a secure yard and made available to the Engineer for inspection

4. a request for partial payment is made
SECTION 9-1.16E WITHHOLDS
Replace 1st paragraph in Section 9-1.16E(2) with:

The City withholds 10 percent of a progress payment for noncompliant progress. Noncompliant progress occurs when:

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-49 10/26/2022

1. Total days to date exceed 75 percent of the working days

2. Percent of working days elapsed exceeds the percent of value of work completed by more than 15 percent
Add to Section 9-1.16E(2).

The City may withhold a portion of your payment for fines and mitigation imposed by outside regulatory authorities, as a result of your failure to comply with regulations and permits.

Upon Contractor's request, City will make payment of funds withheld from progress payments pursuant to the requirements of Public Contract Code Section 22300, if Contractor deposits in escrow with City or with a bank acceptable to City, securities eligible for investment under Government Code Section 16430, bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by Contractor and City, upon the following conditions:
a. Contractor shall bear the expense of City and the escrow agent in connection with the escrow deposit made.
b. Securities or certificates of deposit to be placed in escrow shall be of a value at least equivalent to the amounts of retention to be paid to Contractor pursuant to this section. c. Contractor shall enter into an escrow Contract satisfactory to City, which Contract shall be substantially similar to the form provided in Public Contract Code Section 22300. d. Contractor shall obtain the written consent of the surety to such Contract.

SECTION 9-1.16E(4) STOP NOTICE WITHHOLDS
Replace Section 9-1.16E(4) Stop Notice Withholds with the following:

The City shall withhold payments to cover claims filed under Civil Code §9000 et seq. The City will withhold 125 percent of the value of all Stop Notices in accordance with Civil Code §9364.

Stop notice information may be obtained from the Engineer.

SECTION 9-1.16F RETENTIONS
Replace Section 9-1.16F Retentions with the following:

Public Contract Code 7202 does not apply to the City.

City shall retain five percent (5%) of the estimated value of the work completed and five percent (5%) of the value of materials estimated to have been furnished and delivered and unused or furnished and stored as part security for the fulfillment of the Contract by Contractor. Securities may be substituted as set forth in Public Contracts Code Section 22300. No such invoice or payment will be construed to be an acceptance of any work or materials. Before any progress payment or the final payment is made, Contractor may be required to submit satisfactory evidence that he is not delinquent in payments to his employees, subcontractors, suppliers or other creditors for labor and materials incorporated into the work.

SECTION 9-1.17 PAYMENT AFTER CONTRACT ACCEPTANCE
SECTION 9-1.17C PROPOSED FINAL ESTIMATE
Delete 3rd paragraph in Section 9-1.17C Proposed Final Estimate.

SECTION 9-1.17D FINAL PAYMENT AND CLAIMS
SECTION 9-1.17D(1) GENERAL
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-50 10/26/2022
Replace Section 9-1.17D(1) General with the following:

If Contractor accepts the proposed final estimate or does not submit a claim statement within 30 days of receiving the proposed final estimate, the Engineer will process the proposed final estimate for payment. The final payment will not be due and payable until the expiration of 40 days from the date the notice of completion is filed with the City of Emeryville. The Notice of Completion will be filed within five days of formal acceptance of the work by the City Council or its designated representative, upon the recommendations of the Engineer.

This final estimate and payment is conclusive except as specified in Sections 5-1.27, 6-3.06, and 9-1.21.

If Contractor submits a claim statement within 30 days of receiving the Engineer’s proposed final estimate, the Engineer will process for payment the proposed final pay estimate for payment of the uncontested amount due.

The Engineer will pay the uncontested amount due within 40 days from the date the notice of completion is filed with the City of Emeryville. The uncontested amount due estimate is conclusive as to the amount of work completed and the amount payable except as affected by the claims or as specified in Sections 5-1.27, 6-3.06, and 9-1.21.

SECTION 9-1.17D(2) CLAIM STATEMENT
SECTION 9-1.17D(2)(A) GENERAL
Add to Section 9-1.17D(2)(a) General as follows:

For each claim, submit a claim statement showing:

1. The identification number

2. Date the Initial Potential Claim was furnished to the Engineer

3. Date the Supplemental Potential Claim was furnished to the Engineer

4. The final amount of additional payment requested

5. Attach a copy of the Full and Final Potential Claim Record Submit claims to:

City Engineer
City of Emeryville – Public Works Department
1333 Park Avenue
Emeryville, CA 94608
SECTION 9-1.17D(2)(D) WAIVER
Add to 1st paragraph in Section 9-1.17D(2)(d) Waiver as follows:

1. You did not comply with applicable notice or protest requirements including but not limited to:

Section 4-1.06;
Section 5-1.06;
Section 5-1.42; or
Section 8-1.07.

SECTION 9-1.17D(3) FINAL DETERMINATION OF CLAIMS
Delete 6th paragraph in Section 9-1.17D(3) Final Determination of Claims.

SECTION 9-1.22 ARBITRATION
Replace Section 9-1.22 Arbitration with the following:

Section 9-1.22 Claim Resolution Procedure

1. For all claims contested by the Engineer and not included in the semifinal estimate, the Engineer may request additional information within 30 days of submittal of the semifinal estimate. A proof of mailing or delivery must be retained.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW-20103 B-51 10/26/2022

2. You must submit to the Engineer the information requested for each claim within 30 days of the date of mailing of the Engineer’s request. Proof of mailing or Engineer’s receipt will be retained for the submittal. Failure to timely submit the information requested is deemed a waiver of the claim.

3. The Engineer will submit a written response to you for each claim within 30 days after the date of mailing of your submittal, or if the Engineer did not request additional information, within 30 days of submittal of the semifinal estimate.

4. If you dispute the Engineer’s written response to any claim, or the Engineer fails to respond within the time specified, you must notify the Engineer in writing, either within 15 days of the Engineer’s response or the Engineer’s failure to respond within the specified time period, and demand an informal meeting to discuss and attempt to settle the issues remaining in dispute. Upon receipt of such a demand, the Engineer will schedule such a meeting within 30 days.

5. Following the meeting if any claim or portion thereof remains in dispute, you may file a claim as provided in Government Code 910 and following.

6. Either party may request non-binding mediation at any time following the informal meeting in an attempt to settle any issues remaining in dispute. If both sides agree to mediation and agree on a mediator, the parties must pay equally the fees and expenses of the mediator.

7. If either party initiates litigation against the other, within 60 days, but no earlier than 30 days, following the filing of the responsive pleading, the court may submit the matter to nonbinding mediation unless both parties stipulate to waive this requirement. The parties must select a disinterested third person as mediator within 15 days following the 60th day after the filing of the responsive pleading, and the mediation must commence within 30 days of selection of the mediator, unless the parties stipulate otherwise, or the court, on a showing of good cause, orders a time extension. If the parties fail to select a mediator within the 15-day period, any party may petition the court to appoint the mediator. The parties must pay equally the fees and expenses of the mediator.

The court may, upon either party’s request, order any witnesses to participate in the mediation process. The party requesting the appearance of any witness must pay the costs and expenses of the witness.

SECTION 9-1.23 CITY BILLING
Add Section 9-1.23 City Billing as follows:

Where City staff and equipment are used for work, billing will be done at the hourly billing rate for particularly involved City staff. City materials and equipment will be billed in compliance with Section 9-1.04. Work performed by a third party will be billed at the amount charged to the City for the work plus an additional five percent markup. The total cost plus markup may be retained from contract or for private work billed to permittee.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 1 10/26/22
2 PART C

SPECIAL PROVISIONS
FOR
PROJECTS:
40TH STREET BRIDGE RAILING AND LUMEC

LIGHT POLE PAINTING PROJECT
PROJECT NO. EPW-20103
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 2 10/26/22
2 SECTION 1

MISCELLANEOUS
1-1.0 WORK SITE MAINTENANCE
1-1.1 Clean Up and Dust Control
During the progress of work, the Contractor shall keep the entire job site in a clean and orderly condition. Spillage resulting from hauling operations along or across existing streets, roads, paths or lawns shall be removed immediately by the Contractor. All gutters and roadside ditches shall be kept clean and free from obstruction. Any deviation from this practice must have written approval from the City Engineer.

The generation of dust shall be controlled as required by the Bay Area Air Quality Management District. The Contractor shall govern his operations and construction methods at all times so as to prevent any dust problems within the area of work or along adjacent properties and shall provide the water wagons, water, labor, or any material or equipment required to provide adequate control of dust to the complete satisfaction of the Engineer. Dust-generating activities shall cease during periods of high winds (greater than 25 MPH). Trucks hauling soil, dirt, sand or other emissive materials shall have their loads covered with a tarp or other protective cover as determined by the Engineer. Any damage resulting from dust shall be the complete and sole responsibility of the Contractor.

No separate payment will be made for dust control but shall be included in the appropriate item of work.

Before final acceptance of the work, the Contractor shall carefully clean up the work area and premises remove all surplus construction materials and rubbish of all kinds from the grounds which he has occupied and leave them in a neat condition. 1-1.2 Water Pollution Control
The intent of these requirements is to enforce federal, state, and other local agency regulation prohibiting storm water pollution from construction sites. The storm drain system discharges directly to creeks and the San Francisco Bay without treatment. Therefore, pollutant discharge into the storm drain system is strictly prohibited. Here pollutant discharge means any substance, material, or waste, and discharges NOT permitted under the National Pollutant Discharge Elimination System regulated by the State of California Regional Water Quality Control Board or the United States Environmental Protection Agency other than uncontaminated storm water.

The Contractor shall conform to all applicable local, state and Federal regulations and laws pertaining to water pollution control. The Contractor shall conduct and schedule operations and follow and implement Best Management Practices (BMPs) in such a manner as to prevent water pollution.

Full compensation for Water Pollution Control shall be considered as included with all contract DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 3 10/26/22
2 items of work and no additional compensation will be allowed therefore. 1-1.2.1 Best Management Practices.

For the purpose of eliminating storm water pollution, the Contractor shall implement effective control measures known as Best Management Practices (BMPs). BMPs include schedules of activities, prohibition of practices, general good housekeeping practices, operational practices, pollution prevention practices, maintenance procedures, and other management procedures to prevent pollutant discharge directly or directly into the storm drain system. BMPs also include the construction of some facilities that may be required to prevent, control, and abate storm water pollution. The Contractor shall implement and maintain such BMPs as are relevant to the work, and as are specifically required by the Plans or Special Provisions. The Contractor shall be responsible throughout the Contract duration for installing, constructing, inspecting, maintaining, removing and disposing of BMPs for non-storm water control, and waste management and materials pollution control.

Unless otherwise directed by the Engineer, the Contractor shall be responsible for BMP implementation and maintenance throughout any temporary suspension of the Work.

Any BMP required to protect storm water quality shall be installed within 24 hours of the time Contractor is notified by the Engineer or regulatory agencies to install such BMP's. 1-1.2.2 Material Storage.

Storage and exposure of raw materials, by-products, finished products, and containers shall be controlled as described below:

All construction materials shall be stored at least ten feet away from inlets, catch basins, and curb returns. The Contractor shall not allow any material to enter the storm drain system. At the end of each working day, the Contractor shall collect and dispose of all scrap, debris, and waste material excluding materials set aside for recycling and salvage.

Materials set aside for recycling and salvage shall be delivered to the recycling station within five days. Materials that can contaminate rainwater or be transported by storm water or other runoff to the storm drain system require special storage. During wet weather or when rain is forecast, the Contractor shall store such materials inside a building or cover them with a tarp or other waterproof material secured with weighted tires or sandbags to prevent contact with rain.

The Contractor is reminded that storage and disposal of all hazardous materials such as paints, thinners, solvents, and fuels; and all hazardous wastes such as waste oil, must meet all federal, state and local standards and requirements. 1-1.3 Storage in Public Streets and Right-of-Way
Construction equipment and materials shall not be stored in public streets and right-of-way. 1-1.4 Storage of Equipment and Material on Private Property If the Contractor wishes to use private property as a Construction Yard, then prior to any staging, DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 4 10/26/22
2 storing, or parking of any Contract equipment and/or materials on said private property, the Contractor shall comply with the following requirements:
a. The Contractor must provide the Engineer a site map for review indicating the proposed location of the Construction Yard;
b. The location of the Construction Yard must be approved by the Engineer and written approval must be provided to the Contractor by the Engineer; c. The Contractor shall submit to the Engineer a copy of the written agreement with the legal owner of the affected property to be used as a Construction Yard; d. Within the Construction Yard itself, the Contractor must comply with the Best Management Practices for storm water protection as required by the Contract documents. e. The Contractor shall also not deliver or remove any equipment or material outside the Contract construction hours specified.
1-2.0 COOPERATION
Attention is directed to Section 8-1.10 "Utility and Non-Highway Facilities," of the Standard Specifications and these Special Provisions.

Payment for coordination and cooperation shall be considered as fully compensated in the various related items of work and therefore no separate payment will be allowed for said coordination and cooperation between Contractors, utility companies or property owners. 1-3.0 OBSTRUCTIONS
Attention is directed to Section 8.1-10, “Utility and Non-Highway Facilities,” and Section 15, “Existing Highway Facilities,” of the Standard Specifications as well as Section 5.0 of the "Green Book" and these Special Provisions.

The Contractor shall notify the Engineer and the appropriate regional notification center for operators of subsurface installations at least two working days, but not more than 14 calendar days, prior to performing any excavation or other underground works. Regional notification centers include but are not limited to the following:

Notification Center Telephone
Underground Service Alert, 1 (800) 642-2444
Northern California (USA)
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 5 10/26/22
2 1-4.0 CONSTRUCTION AREA SIGNS
Construction area signs shall be furnished, installed, maintained, and removed when no longer required in accordance with the provisions in Section 12, “Construction Area Traffic Control Devices,” of the Standard Specifications and as shown on the plans, and these Special Provisions.

All excavations required to install construction area signs shall be performed by hand methods without the use of power equipment, except that power equipment may be used if it is determined, to the satisfaction of the engineer that there are no utility facilities in the area of the proposed posthole excavations.

Full compensation for furnishing, placing, maintaining, and removal of construction area signs shall be included in all other items of work and no separate payment will be allowed therefore. 1-5.0 MAINTAINING TRAFFIC
Attention is directed to Sections 7-1.08 "Public Convenience", 7-1.09 "Public Safety", and 12 "Construction Area Traffic Control Devices", of the Standard Specifications, and to the Section entitled "Public Safety" elsewhere in these special provisions, and to these special provisions. Nothing in these special provisions shall be construed as relieving the Contractor from his responsibility as provided in said Section 7-1.09. Lane closures shall conform to the provisions in Section 12 “Construction Area Traffic Control Devices” of the Standard Specifications.

Access to all properties shall be maintained at all times and not impact their daily operations. If necessary, the Contractor shall construct in phases or in a manner to ensure no disruption to accessibility.

The contractor shall keep and maintain ADA compliance through all working areas. On the 40th Street Bridge, the Contractor shall provide and maintain a minimum (1) 5-foot-wide path for WB/EB pedestrian traffic through the construction site. At light pole painting sites, Contractor may close sidewalks provided that provisions and signage for detour pedestrian routes have been made.

The Contractor shall provide and maintain safe travel for bicycles through the construction area. Bicyclist shall be notified by signage of changes to the bicycle route, and Contractor shall provide proper signage or temporary traffic markings to guide bicyclists through the construction area.

Parking may be removed adjacent to the individual worksites to provide room for a pedestrian detour path. The Contractor shall plan all work activities to occur Monday – Friday. If drying of wet paint is required over the weekend period, the Contractor shall protect the site and provide alternative riding/walking surface through the project area.

A traffic control plan (TCP) shall be submitted by the Contractor prior to construction activities, and this must be approved by the Engineer. The TCP shall provide detours for vehicles, bicycles, and pedestrians.

After the TCP is approved, the Contractor must notice all affected properties. Standard working detail to be used at general street light locations will be considered if on a non-major roadway (local roadway 25mph).

No reduction of the traveled way width shall be permitted before 7:00 a.m. nor after 6:00 p.m. on any street unless prior approval in writing is obtained from the Director of Public Works. The Contractor shall DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 6 10/26/22
2 also not store construction equipment within any public streets and right of way outside the previously specified hours. The Contractor shall also not deliver/remove any equipment or material to/from the Construction Yard or work area outside the previously specified hours.

The Contractor shall cooperate with local authorities relative to handling traffic through the area and shall make their own arrangements relative to keeping the working area clear of parked vehicles. Such arrangements shall be subject to the prior written approval of the Engineer.

Personal vehicles of the Contractor’s employees shall not be parked on the traveled way or shoulders, including any section closed to public traffic.

The Contractor shall submit separate traffic control plans for the 40th Street Bridge Railing Painting work and for the Lumec Light Pole Painting work, for approval by the Engineer. These plans shall include a public notice submittal for the City’s review and approval.

The Contractor shall provide and maintain traffic control during all construction activities in accordance with the Work Area Traffic Control Manual Handbook (WATCH) or the approved Traffic Control Plan. If the Contractor cannot provide and maintain traffic control as required, then the Engineer may direct the Contractor to provide, maintain, and/or update a full traffic control plan (signed by a registered Professional Engineer/Traffic Engineer), with no additional compensation.

Full compensation for conforming to the requirements in this section "Maintaining Traffic" shall be considered as included in the contract price paid for Traffic Control System and no additional compensation will be allowed therefor.
1-6.0 PROGRESS SCHEDULE
Progress schedules will be required for this contract and shall conform to the provisions in Section 8-1.04 "Progress Schedule" of the Standard Specifications. Full compensation for Progress Schedule shall be considered as included with all contract items of work and no additional compensation will be allowed therefore.
1-7.0 TIME OF COMPLETION
The Contractor shall complete the work within eighty (80) working days after the commencement date specified in the Notice to Proceed.

For Bid Alt Item No. A2-A9, the time of completion shall be extended an additional day for every 3 poles added to the contract.

The contractor shall commence operations within 7 calendar days after the effective date of the Notice to Proceed.
1-8.0 HOURS OF WORK
The Hours of Work for this project shall be as follows for non-holiday weekdays: 7:00 a.m. to 6:00 p.m.

Work activities occurring between the hours of 6:00 pm and 7:00 am shall not be permitted. The use of spray guns, loud leaf blowers, generators, and other equipment with noise levels similar to those of jackDocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 7 10/26/22
2 hammers/pile-drivers shall be done after 8:00 a.m. Contractors shall practice caution and courtesy when working adjacent to homes and businesses. Proper notification and estimated timelines of work shall be given to nearby homeowners and business owners as part of the Section 10-2.3 requirements. 1-9.0 AS-BUILT DRAWINGS
The Contractor shall maintain one (1) clean set of marked plans showing all changes and "record" information and submit a copy to the City upon completion of work. Any changes must be approved by the City inspector before being done. Note any changes on marked print copy.

The Contractor is required to track and record all changes made throughout the completion of the project and shall submit a complete red-lined copy of the construction plans to the Engineer for review of those changes indicated. If necessary, the Contractor shall address any comments and resubmit the red-lined plans. Upon approval by the Engineer, the Contractor shall submit 2 hard copies and 1 electronic PDF copy of the final approved red-lined plans. A Notice of Completion and/or Final Payment will not be released until the approved red-lined plans are received as described. The cost of the work and materials to provide the approved red-lined construction plans shall be included in the cost for Mobilization 1-10.0 PUBLIC SAFETY
The Contractor shall provide for the safety of traffic and the public in accordance with the provisions in Section 7-1.09, "Public Safety," of the Standard Specifications and these special provisions.

The Contractor shall install temporary railing (Type K) between any lane carrying public traffic and any excavation, obstacle, unprotected pedestrian walkway, or storage area when the following conditions exist:
(1) Excavations.

Any excavation, the near edge of which is 12 feet or less from the edge of the lane, except:
(a) Excavations covered with sheet steel or concrete covers of adequate thickness to prevent accidental entry by traffic or the public.
(b) Excavations less than one foot deep.
(c) Trenches less than one foot wide for irrigation pipe or electrical conduit, or excavations less than one foot in diameter.
(d) Excavations parallel to the lane for the purpose of pavement widening or reconstruction. (e) Excavations in side slopes, where the slope is steeper than 4:1. (f) Excavations protected by existing barrier or railing. (2) Temporarily Unprotected Permanent Obstacles.

Whenever the work includes the installation of a fixed obstacle together with a protective system, such as a sign structure together with protective railing, and the Contractor elects to install the obstacle prior to installing the protective system; or whenever the Contractor, for his convenience and with permission of the Engineer, removes a portion of an existing protective railing at an obstacle and does not replace such railing complete in place during the same day. (3) Temporarily Unprotected Pedestrian Pathways.

Whenever temporary unprotected pedestrian walkways are located adjacent to the traffic lane through the construction area.
(4) Storage Areas.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 8 10/26/22
2 Whenever material or equipment is stored within 12 feet of the lane and such storage is not otherwise prohibited by the specifications.

The approach end of temporary railing (Type K), installed in accordance with the requirements in this section "Public Safety" and in Section 7-1.09, "Public Safety," of the Standard Specifications shall be offset a minimum of 15 feet from the edge of the traffic lane open to public traffic. The temporary railing shall be installed on a skew toward the edge of the traffic lane of not more than one foot transversely to 10 feet longitudinally with respect to the edge of the traffic lane. If the 15-foot minimum offset cannot be achieved, the temporary railing shall be installed on the 10 to 1 skew to obtain the maximum available offset between the approach end of the railing and the edge of the traffic lane, and an array of temporary crash cushion modules shall be installed at the approach end of the temporary railing.

Temporary railing (Type K) shall conform to the provisions in Section 12-3.08, "Temporary Railing (Type K)" of the Standard Specifications, except temporary railing (Type K) fabricated prior to January 1, 1993, with one longitudinal No. 5 reinforcing steel bar near the top in lieu of the 2 longitudinal No. 5 reinforcing steel bars near the top, as shown on the plans, may be used.

Temporary crash cushion modules shall conform to the provisions in "Temporary Crash Cushion Module" elsewhere in these special provisions.

Except for installing, maintaining and removing traffic control devices, whenever work is performed or equipment is operated in the following work areas, the Contractor shall close the adjacent traffic lane unless otherwise provided in the specifications:

Approach Speed of Public Traffic
(Posted Limit in MPH)
Over 45
35 to 45
Work Areas
Within 6 feet of a traffic lane but not on a
traffic lane.

Within 3 feet of a traffic lane but not on a
traffic lane.

The lane closure provisions of this section shall not apply if the work area is protected by permanent or temporary railing or barrier.

When traffic cones or delineators are used to delineate a temporary edge of traffic lane, the line of cones or delineators shall be considered to be the edge of traffic lane, however, the Contractor shall not reduce the width of an existing lane to less than 10 feet without written approval from the Engineer.

When work is not in progress that required closure of an adjacent lane, the traffic cones or portable delineators used for the lane closure shall be placed off of and adjacent to the edge of the traveled way.

The spacing of the cones or delineators shall be not more than the spacing used for the lane closure.

Suspended loads or equipment shall not be moved nor positioned over public traffic or pedestrians.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 9 10/26/22
2 Full compensation for conforming to the requirements in this section "Public Safety," including furnishing and installing temporary railing (Type K) and temporary crash cushion modules, shall be considered as included in the contract price paid for Traffic Control System and no additional compensation will be allowed therefor.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 10 10/26/22
2 SECTION 2
BLANK
SECTION 3
BLANK
SECTION 4
BLANK
SECTION 5
BLANK
SECTION 6
BLANK
SECTION 7
BLANK
SECTION 8
BLANK
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 11 10/26/22
2 SECTION 9

DESCRIPTION OF WORK
9-1.0 WORK TO BE PERFORMED
This project generally includes, but is not limited to, the preparation and painting of the following metal surfaces within the City of Emeryville:
• the 40th Street Bridge Railing,
• Approximately fifty-three (53) Lumec lights along or immediately west of Shellmound Street, and
• Alternative Bid items, which may or may not be included in the project, consist of painting up to a total of 441 Lumec light pole paint at various locations throughout town.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 12 10/26/22
2 SECTION 10

CONSTRUCTION DETAILS
10-1.0 ORDER OF WORK
Order of Work shall conform to the provisions in Section 5-1.05, “Order of Work”, of the Standard Specifications and these Special Provisions.

The first order of work after the Notice to Proceed is to provide an accurate project schedule, example public notice, and traffic control plans for approval by the Engineer.

Work shall be staged in a manner to maintain two-way traffic (including allowances and proper signage for bicyclists) and at least one pedestrian path at all times within the given work zone.

Payment for staging and coordinating work shall be included with the associated items of work. 10-2.0 ITEMS OF WORK – GENERAL
All items of work are to be installed or constructed as specified in the Standard Specifications, the Standard Plans, as shown on the plans, or as modified in these Special Provisions. Each item is listed with the corresponding sections of the Standard Specifications, which may apply thereto. These listings are not necessarily all of the sections which may apply and are not meant to exclude other sections which are not referred to specifically but do give direction to the work. The Special Provisions shall take precedence over the Plans and the Plans shall take precedence over the Standard Specifications. 10-2.1 BID ITEM 1 – SUPPLEMENTAL WORK
This item is provided to account for new and unforeseen work not specifically provided for on the plans or in the Special Provisions. The dollar amount listed in the Estimate of Quantities is an estimate only and will be included in each bidder's proposal. Supplemental work shall be performed only upon direct written authorization from the City Engineer. Daily work reports will be required if the work is to be paid for on a force account basis. Agreed price may be used as an alternate method of payment, if directed by the City Engineer.
10-2.1.1 Payment for Bid Item 1 – Supplemental Work
Final payment for “Supplemental Work” will be based on the total amount of supplemental work actually performed and will not be subject to the provisions of Section 4 of the Standard Specifications.
10-2.2 BID ITEM 2– MOBILIZATION
Mobilization shall conform to the provisions in Section 11, “Mobilization,” of the Standard Specifications 10-2.2.1 Payment for Bid Item 2 - Mobilization
The contract lump sum price paid for “Mobilization” shall include full compensation for furnishing DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 13 10/26/22
2 all labor, materials, tools, equipment and incidentals, and for doing all the work involved in mobilization, including placing, removing, maintaining, moving to new locations, and furnishing Record Drawings as specified in the Standard Specifications and these Special Provisions. 10-2.3 BID ITEM 3 – TRAFFIC CONTROL SYSTEM: 40TH STREET BRIDGE RAILING

PAINTING
A traffic control system shall consist of modifying or closing traffic lanes in accordance with the provisions under Section 1-4.0 "Construction Area Signs” and Section 1-5.0 "Maintaining Traffic” found elsewhere in these Special Provisions, the provisions of Section 12 "Construction Area Traffic Control Devices" of the Standard Specifications, and the Project Plans. Full roadway closures will not be allowed.

This work shall include but not be limited to the implementation of the plans detailing traffic handling and installation of construction area signs. The work of this item shall include removal of said signs upon completion of the work.

Prior to the start of each portion of work the Contractor shall submit a specific traffic control plan for approval by the Engineer for the 40th Street Bridge Railing Painting site. This plan shall include a public notice submittal for the City’s review and approval. Public notification of parking and access restrictions shall be posted not less than 3 working days prior to the start of work for that area. If work is postponed the area shall be re-posted for another 3 working day period. The Contractor shall be responsible for informing all potentially affected businesses and agencies including transit operators and emergency service providers of the work that is to occur and the impact to vehicular movements. A list of these operators and emergency service providers will be provided at the pre-construction meeting.

The Contractor shall provide and maintain traffic control during all construction activities in accordance with the approved Traffic Control Plan. If the Contractor cannot provide and maintain traffic control as required, then the Engineer may direct the Contractor to provide, maintain, and/or update a full traffic control plan (signed by a registered Professional Engineer/Traffic Engineer), with no additional compensation.

The Contractor shall be responsible to keep pedestrian, bicycle, and vehicle traffic away from painted surfaces until paint has dried completely. The Contractor shall be responsible for any touch-ups needed due to damage caused by trespassing.

The provisions in this section will not relieve the Contractor from his responsibility to provide such additional devices or take such measures as may be necessary to comply with the provisions in Section 7-1.09, "Public Safety" of the Standard Specifications.

If any component in the traffic control system is displaced or ceases to operate or function as specified, from any cause, during the progress of the work, the Contractor shall immediately repair said component to its original condition or replace said component and shall restore the component to its original location.

If, during the course of the work, the Engineer determines, in his sole discretion, that traffic control systems are not functioning adequately or as intended, he may order field revisions to be made to the system(s). Contractor shall make those ordered revisions and maintain those ordered revisions until further directed by the Engineer. All costs for revisions and maintenance of those revisions shall be included in the lump sum contract price described below.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 14 10/26/22
2 10-2.3.1 Payment for Bid Item 3 – Traffic Control System: 40th Street Bridge Railing Painting
The contract lump sum price paid for “Traffic Control System: 40th Street Bridge Railing Painting” shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in providing and maintaining traffic control system, including placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control system, traffic handling plans, notifications, Construction Area Signs, as specified in the Standard Specifications, these Special Provisions and as shown on the project plans.
10-2.4 BID ITEM 4 – TRAFFIC CONTROL SYSTEM: LUMEC LIGHT POLE PAINTING A traffic control system shall consist of modifying or closing traffic lanes in accordance with the provisions under Section 1-4.0 "Construction Area Signs” and Section 1-5.0 "Maintaining Traffic” found elsewhere in these Special Provisions, the provisions of Section 12 "Construction Area Traffic Control Devices" of the Standard Specifications, and the Project Plans. Full roadway closures will not be allowed.

This work shall include but not be limited to the implementation of the plans detailing traffic handling and installation of construction area signs. The work of this item shall include removal of said signs upon completion of the work.

Prior to the start of each portion of work the Contractor shall submit a specific traffic control plan for approval by the Engineer for the Lumec Light Pole Painting sites. This plan shall include a public notice submittal for the City’s review and approval. Public notification of parking and access restrictions shall be posted not less than 3 working days prior to the start of work for that area. The Emeryville Police Department will not be able to cite/tow vehicles if the no parking restricted area is not confirmed 3 days prior to the effective date. The Contractor shall coordinate schedules with the Engineer and Police Department as the parking restriction signs are being installed. If work is postponed, the area shall be re-posted for another 3 working day period. The Contractor shall be responsible for informing all potentially affected businesses and agencies including transit operators and emergency service providers of the work that is to occur and the impact to vehicular movements. A list of these operators and emergency service providers will be provided at the pre-construction meeting.

The Contractor shall provide and maintain traffic control during all construction activities in accordance with the approved Traffic Control Plan. If the Contractor cannot provide and maintain traffic control as required, then the Engineer may direct the Contractor to provide, maintain, and/or update a full traffic control plan (signed by a registered Professional Engineer/Traffic Engineer), with no additional compensation.

The Contractor shall be responsible to keep pedestrian, bicycle, and vehicle traffic away from painted surfaces until paint has dried completely. The Contractor shall be responsible for any touch-ups needed due to damage caused by trespassing.

The provisions in this section will not relieve the Contractor from his responsibility to provide such additional devices or take such measures as may be necessary to comply with the provisions in Section DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 15 10/26/22
2 7-1.09, "Public Safety" of the Standard Specifications.

If any component in the traffic control system is displaced or ceases to operate or function as specified, from any cause, during the progress of the work, the Contractor shall immediately repair said component to its original condition or replace said component and shall restore the component to its original location.

If, during the course of the work, the Engineer determines, in his sole discretion, that traffic control systems are not functioning adequately or as intended, he may order field revisions to be made to the system(s). Contractor shall make those ordered revisions and maintain those ordered revisions until further directed by the Engineer. All costs for revisions and maintenance of those revisions shall be included in the lump sum contract price described below. 10-2.4.1 Payment for Bid Item 4 – Traffic Control System: Lumec Light Pole Painting The contract lump sum price paid for “Traffic Control System: Lumec Light Pole Painting” shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in traffic control system, including placing, removing, storing, maintaining, moving to new locations, replacing and disposing of the components of the traffic control system, traffic handling plans, notifications, Construction Area Signs, as specified in the Standard Specifications, these Special Provisions and as shown on the project plans. 10-3.0 TECHNICAL SPECIFICATIONS FOR 40th STREET BRIDGE RAILING PAINTING

AND LUMEC LIGHT POLE PAINTING
All items of work are to be conducted as specified in the Standard Specifications or as modified in these Special Provisions. Each item is listed with the corresponding sections of the Standard Specifications, which may apply thereto. These listings are not necessarily all of the sections which may apply and are not meant to exclude other sections which are not referred to specifically but do give direction to the work.

Guard railing and light poles to be painted shall be thoroughly cleaned, primed, and painted in accordance with industry standards, the State Standard Specifications, and as specified in these Special Provisions.

Preparation and painting work and payment therefore shall conform to the provisions in Sections 59 and 91 of the State Standard Specifications and these Special Provisions. 10-3.1 Items of Work for 40th Street Bridge Railing and Lumec Light Pole Painting The 40th Street Bridge Railing and Lumec Light Pole Painting items of work fall into the following categories:
• Bid Item 5 – 40th Street Bridge Railing Painting
• Bid Item 6 & 7 – Lumec Light Pole Painting
• Bid Alternative Items A1-A9 – Lumec Replacement Parts & Painting 10-3.1.1 Payment for Bid Item 5 – 40th Street Bridge Railing Painting The contract price paid per lineal foot for “40th Street Bridge Railing Painting” shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 16 10/26/22
2 doing all the work involved in bridge railing painting as defined in Exhibit D1 of these Special Provisions, including preparing and sending submittals, obtaining and complying with any necessary permits, protecting of surfaces not scheduled to be coated, surface preparation, application of paint, protecting painted surfaces during the curing process, site clean-up and restoration of the site to pre-construction conditions, and no additional allowance will be made therefor.
10-3.1.2 Payment for Bid Item 6 – Lumec Light Pole Painting The “Lumec Light Pole Painting” shall be paid at the contract price each, which price shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in painting light poles as defined in Exhibits D2 and D3, and these Special Provisions, including preparing and sending submittals, obtaining and complying with any necessary permits, protecting of surfaces not scheduled to be coated, surface preparation, application of primer and paint, protecting painted surfaces during the curing process, light pole re-labelling, site clean-up and restoration of the site to preconstruction conditions, and no additional allowance will be made therefor. 10-3.1.3 Payment for Alternate Bid Items A1-A9 – Lumec Light Pole Replacement Parts & Painting
The “Lumec Light Pole Replacement Parts & Painting” shall be paid at the contract unit price, which price shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in furnishing replacement parts or painting light poles as defined in Exhibits D2 and D3, and these Special Provisions, including preparing and sending submittals, obtaining and complying with any necessary permits, protecting of surfaces not scheduled to be coated, surface preparation, application of primer and paint, protecting painted surfaces during the curing process, light pole re-labelling, site clean-up and restoration of the site to pre-construction conditions, and no additional allowance will be made therefor.

Mobilization and Traffic Control for the alternate bid item locations shall be included in the contract unit price for Alternate Bid Items A2-A9, and no additional allowance will be made therefor.
10-3.2 General
All equipment and material that the Contractor proposes to install shall conform to these specifications and the contract plans. For convenience in designation on the Contract Documents, certain articles or materials to be incorporated in the work may be designated under a trade name or the name of a manufacturer and the manufacturer's catalogue information.

If these Special Provisions specify manufacturers’ names along with the term “City approved equal”, the use of an alternative article or material which is of equal or superior quality and of the required characteristics for the purpose intended will be permitted, subject to the following requirements:

The burden of proof as to the quality and suitability of alternatives shall be upon the Contractor, and the Contractor shall furnish all information necessary as required by the Engineer. The DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 17 10/26/22
2 Engineer shall be the sole judge as to the quality and suitability of alternative articles or materials, and the Engineer's decision shall be final.

Whenever the Contract Documents permit the substitution of a similar or equivalent material or article, no tests or action relating to the acceptance of the substitute material will be made until the request for substitution is made in writing by the Contractor accompanied by complete data as to the equality of the material or article proposed. Request for such substitution shall be made in writing by the Contractor within thirty (30) days of the Notice to Proceed. Failure by the Contractor to request substitution within thirty (30) days of the Notice to Proceed constitutes an agreement by Contractor to furnish only the materials or equipment listed in the Contract Documents. Until and unless such substitutions are authorized in writing by the Engineer, no deviations from the specifications shall be allowed.
10-3.3 Submittals
All submittals shall be electronically submitted to the Engineer at least ten (10) working days prior to initiating the work. The contractor shall provide all submittals listed in this Section.

Contractor shall submit a Work Plan describing the methods and means to be used in the project, including:

1. Location of Equipment and Material Staging Areas

2. List of Equipment to be Used

3. Worker Health and Safety Measures

4. Dust and Debris Containment and Collection Measures

5. Identification and Treatment of Inaccessible Areas

6. Protection of Surfaces Not to be Painted

7. Surface Preparation Methods

8. Paint Application Methods

9. Clean-up
Contractor shall submit a Traffic Control Plan per Section 10-2.3.

Contractor shall submit a Project Schedule to be updated at least every two weeks, or as significant changes occur.

Contractor shall submit Product Data for all cleaning and coating materials for the Engineer’s approval, including:

1. Product manufacturer’s name,

2. Product data for each coating,

3. Generic description,

4. Complete technical data,

5. Material Safety Data Sheets,

6. Surface preparation,

7. Application instructions
Contractor shall provide four (4) samples for Engineer’s approval of:

1. Samples of the color specified in a variety of finishes and colors 10-3.4 Quality Assurance
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 18 10/26/22
2 10-3.4.1 Applicator’s Qualifications.

The contractor shall be experienced in the application of the specific coatings for a minimum of five (5) years on projects of similar size and complexity.

The contractor shall employ persons trained in the application of the specified coatings. 10-3.5 Environmental Requirements
10-3.5.1 Weather.

The contractor shall prepare surfaces and apply and cure coatings within the air and surface temperature range in accordance with the manufacturer’s instructions.

The contractor shall maintain surface temperatures a minimum of five (5) degrees F (three (3) degrees C) above dew point at the time of final surface preparation, material mixing, and application.

The contractor shall prepare surfaces and apply and cure coatings within the relative humidity range in accordance with the coating manufacturer’s instructions.

The contractor shall not prepare surfaces or apply coatings in rain, snow, fog, or mist.

The contractor shall not spray coatings if wind velocity is above the coating manufacturer’s limit.
10-3.5.2 Dust and Contaminants.

The contractor shall schedule coating work to avoid excessively windy conditions that would result in overspray, dust, or airborne contaminants shall take the necessary steps to protect the work areas from excessive overspray, dust, or airborne contaminants during the coating application and curing process.

The contractor shall contain and collect removed paint, dust and debris resulting from the work. The contractor shall prevent dust and removed coatings from falling off the bridge or being washed or blown from the work site.

The contractor shall include in the Work Plan a description of dust and debris containment and collection measures to be used during the work. The contractor shall make a conscientious, “state of the practice” job in collecting and containing dust and debris. The work plan will be approved by the Engineer prior to the initiation of any surface preparation work.
10-3.6 Protection of Surfaces Not Scheduled to be Coated The contractor shall protect surrounding areas and surfaces that are not scheduled to be coated from damage during surface preparation and the application of coatings.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 19 10/26/22
2 Contractor shall remove signs affixed to areas to be painted and reinstall them after painting.

The contractor shall immediately remove coatings that fall on surrounding areas and surfaces that are not scheduled to be coated.
10-3.7 Surface Preparation
After completion of surface preparation steps on three (3) “test areas” pre-selected by the Engineer, an inspection shall be coordinated to make sure the City and Contractor are in agreement on best means and methods for the rest of the job. 10-3.7.1 Cleaning.

All surfaces to be painted shall be scraped or wire brushed to remove all flaking or loose paint. Wire wheels and/or cup brush grinder attachments may be used. All welds should be inspected and any failed welds should be reported prior to painting. All metal surfaces shall be thoroughly cleaned of oil, grease, soil, rush scale, and all other foreign substances.

Oil and grease may be removed with clean rags saturated in mineral spirits. After cleaning metal surfaces and before applying paint, the contractor shall clean the surfaces to be painted and the paved area surrounding the base of all sand, dust, or other foreign matter in order to prevent such materials from being blown on the freshly painted surface. All surfaces that are not to be painted (glass, light fixtures, attached signs, hand hole screws, electrical wiring, etc.) shall be protected from paint and painting operations. 10-3.7.2 Rust Treatment.

Any areas showing signs of oxidation shall be thoroughly wire brushed and treated with a rust converter that has been approved by the Engineer. The rust treatment must be applied in accordance with label instructions.
10-3.7.3 Primer.

All surfaces, including previously painted surfaces and bare metal surfaces, shall be painted with a single coat of primer according to manufacturer’s instructions.

Primer shall be Sherwin-Williams DTM Bonding Primer or approved equal. Application rates shall achieve a dry film thickness of 2.2-5.3 mils. 10-3.8 Finish Coating
After completion of finish coating on three (3) “test areas” pre-selected by the Engineer, an inspection shall be coordinated to make sure the City and Contractor are in agreement on best means and methods for the rest of the job.

Finish coat shall be:
• Sherwin Williams Pro Industrial Acrylic, Semi-Gloss or Egg-Shel, with application rates to achieve a dry film thickness of 2.1 – 4.2 mils per coat, • Sherwin Williams Multi-Surface Acrylic, Semi-Gloss, with application rates to achieve a dry film thickness of 1.4 – 2.3 mils per coat,
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 20 10/26/22
2 • Sherwin Williams Multi-Surface Acrylic, Egg-Shel, with application rates to achieve a dry film thickness of 1.5 – 2.3 mils per coat,
• Or approved equal.

Application rates shall achieve a total dry film thickness of 4 mils/100 microns with ± 1 mils/24 microns of tolerance. Contractor to submit the coating product data per Section 10-3.3. 10-3.8.1 Color.

The finish color shall be blue green matching RAL 6004. Four samples, in a variety of color and finishes, shall be submitted for approval by the Engineer. 10-3.8.2 Application.

One to two finish coats of paint shall be applied, as required to meet the total dry film thickness specified. All application equipment, tools, pressure settings, and techniques shall be used in accordance with manufacturer’s instructions.

Mixing and thinning of coatings, including multi-component materials shall be in accordance with coating manufacturer’s instructions. Containers shall be kept closed when not in use to avoid contamination.

Contractor shall not use mixed coatings beyond pot life limits.

Uniformly apply coatings at spreading rate required to achieve specified dry film thickness.

Contractor shall be responsible to keep pedestrian, bicycle, and vehicle traffic away from painted surfaces until paint has dried completely. The Contractor shall be responsible for any touch-ups needed due to damage caused by trespassing.

Contractor will at no time obstruct motorists’ view of traffic lights.

The application of all coatings, including exterior coatings shall be free of film characteristics or defects that would adversely affect the performance of the coating system and/or affect appearance.

All work shall be warranted for material and workmanship (peeling or washing) for a minimum of one (1) year.
10-3.9 Quality Control
All applicable codes and standards referenced by the American National Standards Institute (ANSI) and the Occupational Safety and Health Administration (OSHA) and in effect as of the contract date shall govern the work by the contractor for completed systems, materials and workmanship. In addition, any applicable federal, state, and local regulations, and codes and ordinances will apply.

Contractor shall comply with all federal, state and local laws, codes and ordinances applicable to DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E EPW - 20103 Part C, Page 21 10/26/22
2 the work. The contractor will obtain all permits required in connection with the execution of the work, including a City encroachment permit before beginning any work associated with this contract.

Contractor shall secure the work sites prior to beginning work and for the duration of the painting process. The contractor shall restrict all unauthorized vehicular and pedestrian traffic from the worksite. The worksite shall remain free of hazards and debris for the duration of the project.

Contractor shall restore the site to the general condition and appearance as it was before the work began.
10-3.10 Lumec Light Pole Re-Labelling
Once light poles have been painted, Contractor shall clean and affix 3.0-inch tall white retroflective sticker lettering (and or number) according to a list provided by the City. Stickers shall be affixed so as to be viewable from the street.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E PART D

EXHIBITS
FOR
PROJECTS:
40TH STREET BRIDGE RAILING PAINTING

LUMEC LIGHT POLE PAINTING

MARINA LIGHTING REPLACEMENT PROJECT
PROJECT NO. EPW-20103
Exhibit D1: 40th Street Bridge Railing Painting: Limits of Work and Notes (Sheets 1-3) Exhibit D2: Lumec Light Pole Painting Locations (Sheets 1-17) Exhibit D3: Lumec Light Pole Details (Sheets 1-18)
Exhibit D4: Marina Park and Powell Street Lighting (Sheets 1-7) DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E JO 71VNIDI TWOS _ Sl N1 10NI S31-
lOJ I lonG] Cl] 1d SNV_ 0 z 2
JVH QJ DIIH , iH: JIG D] M: jo onend jom i s> 1, : Z I,/ 0 26/ IA3 11Ak]] 1_ 3- J9 ON * 022 ' 662- D IV: VMJ0JI- 919 31VG
G38Vdv400 90t) M, ( Eg- C/ SN011V313103dS ke 0 S* 05DUaUI ' 06 83HONV 133HIS NYS " Isor 11YO 31- 96 ' 11, Z11,
SNVId V S03dS
VOS 3 SV : PION
30 4. 301- NI $ NVS Ism ONLL83dno SYNIIVS ' NY 01N3YVY83VS ® JddV G3AO 31VG J0 A8 di*
S83NNVld inwwi OhluinSN03 S833NION3 IIA13 v lYdIDINnn Jd 103r0) ON Md3 " 01HO 13> kg ( OL :., 6Z/ 26/
03A03HO
N l SdP40H. V 00 0N1 *
D V: V6 209 -
HI Ai.. "
NOIS30 INV 11V483d ( NOIS30 GV01 03NOIS kO VN:., M' D ' iV83N3! 1d Nb 1N3A1dVd3G JO onend smom 3A11 1 J SNOISIA_ iv(] ddv _
I -_ 0 " 1MU n WMUU NS I I -_-
GV01 W13VJ 0N1GV0 0ZSH : tt,- ONS! 1V WIMM- KIAAWUn C1 I j : n, _ J1 L -.

IfI47
D dI: d S/ XO8 J10 Jap -
ipow) pai}
adAi 9Z
JDB J- J@I. 0 - 6Ull!
19alS Dd 5UII!
L o --(
gg 4c0— JDA
L61
A
L - dx3
L ' 2LOZ
ON
OVN3NI _
S4
is
WiOi 103rOJd ON I * 133HS
WiOi iSOd S31IN j133HS1
c99 cc6— JDA ?
DA ? J
aIDDS 4CL : 401, = C40-
UDdS) g
dAJ_ IbOIdJll N011038
Od Sd/ X08 ID A@PJ*
GdAj 5Z paijipoW)
dAj
I JqI51- jGmOj
paiJipoW)
adXi gZ
Japme buljp -
jnqV 6
I,
Nei=
cKi
Jamoi
jqblI
4ZV L- I, TccZ/ D jl:
8 UG I Z_
6 of
GIDOQ I : c = r) n--
IU@e S
LIS I NIS@jD31PUI I jqb1- JGMOJ
ju@wjnqV I, 6279
UIDJ(](] G Z_ 10GO PUE)— S@jD01PUI dAj a I,
m
I, Z 1x3 , 14s. bu. qjnSDaJj PUDISI J@4DM @Ulj
naaS) ao! pooh jDA@I3 UO! UOIIDAG13
D SD! I alll- BOd) bUlISIX- ofig
I
ID0 puDI>
JO AJDJIUDS JaMaS 0) 41! bUIJSIX vz 0- 94
1D0 puD1> 0 bUIJSIX WJOJS UIDJC] D) Aj!: 10
j UbISG( bUlPDOj
PDOd SUDICJ
@IDDS
1 6t V* 2-
z s— 0,, buiu@do job. njnj Gi 411in
jS1I
puD uDn() 1!;
Sal aas .
sinoluoo ON
a)\ o j
lDd lu. a51DPB ON XO ' 66—:
20 L. C62249
JUIDd qjotcc 4GaJ4S PDaqJGA0
III,
IVOIdAJL LO38 NOI.
m
IS Zt V+ 9- 9I,* 00d
Cf)
S310N
49L
xaPuI 01 gSuD1d IDJGUa0 esalON PJDPUIDIS SUDId
JO
a ja DJ! ON
e/ 2z*
M M M T7 joaS D gsjno:
z juge 2 luGe t 4nqV I, luao
1 PJDPUDIS- UDId IG@qS ON
pas D gsjno: juag) Z
I I LL I _ I L L Ll —
Ls I Gul19 O- c( 2 v 4Z \ *
42 440-
Z
1 1 1 1 1 1 11 1 11
1 1 i_ LLJ_ I_I LL FU_
wnwiuiA ID011JaA DUDJDGI0 a: Z 6 Z- q//
wnwiuiA ID014JGA 910 DUDJD; 9: oopul
sa;
juiod
jo
j II! dai
o II!_ @01
10 ARE AANOW__------_ - - - - - - - -
2 Z- 0, 1,
j ; 11! dol
o
j 11! @01
10 8 6Zo Z1
nQc,
o'
V0
4 0 Z 44422.
6 gZZ
V
J
V0 99. 09
1 6
1,= 00 1,
17 D dI: d S/ XO8 J10 Jap -
ipow) pai}
adAi 9Z
JDB J- J@I. 0 - 6Ull!
19alS Dd 5UII!
L o --(
gg 4c0— JDA
L61
A
L - dx3
L ' 2LOZ
ON
OVN3NI _
S4
is
WiOi 103rOJd ON I * 133HS
WiOi iSOd S31IN j133HS1
c99 cc6— JDA ?
DA ? J
aIDDS 4CL : 401, = C40-
UDdS) g
dAJ_ IbOIdJll N011038
Od Sd/ X08 ID A@PJ*
GdAj 5Z paijipoW)
dAj
I JqI51- jGmOj
paiJipoW)
adXi gZ
Japme buljp -
jnqV 6
I,
Nei=
cKi
Jamoi
jqblI
4ZV L- I, TccZ/ D jl:
8 UG I Z_
6 of
GIDOQ I : c = r) n--
IU@e S
LIS I NIJIDM 11DIG bU11,
I
71 11! 10 aOi
09— 99—
S@jD31PUI I jqb1- JGMOJ
ju@wjnqV I, 6279
UIDJ(](] G Z_ 10GO PUE)— S@jD01PUI dAj a I,
m
I, Z 1x3 , 14s. bu. qjnSDaJj PUDISI J@4DM @Ulj
naaS) ao! pooh jDA@I3 UO! UOIIDAG13
D SD! I alll- BOd) bUlISIX- ofig
I
ID0 puDI>
JO AJDJIUDS JaMaS 0) 41! bUIJSIX vz 0- 94
1D0 puD1> 0 bUIJSIX WJOJS UIDJC] D) Aj!: 10
j UbISG( bUlPDOj
9 1V- 0,, D npuo: I! DiDcj) oij!: 99 11, Gas -( PDOd SUDICJ 1 6t V* 2-
z s— 0,, buiu@do job. njnj Gi 411in
A f ( 00% - GAIJOUJGIIV) A 8G11d (
lDd lu. a51DPB ON XO ' 66—:
a)\ o j woo Id I@ pq
20 L. C62249
JUIDd qjotcc 4GaJ4S PDaqJGA0
m
Cf)
S310N
ggg
CA
JIDM 11DIG bU11,I
71 11! 10 aOi
I, gt SuOj 09— 99—
ju@wjnqV
i 6279
C) I
m
Pli
Q0
Icy
naaS) ao! pooh jDA@I3 UO! UOIIDAG13
I L Z 6 -
1 bZ L'-
U01 j UbISG( bUlPDOj pailpacIS dii alqDqojcj dii 1 6t V* 2- I DO- jD:
891810 P 09- GA118UJejjNf) A f ( 00% - GAIJOUJGIIV) A 8G11d ( ud leiva v 20 L. C62249
62 j ggg
e/ 2z*
z juge 2 luGe t
c006 4nqV I, luao
9 joaS ( D asino: dAj)
Ls I Gul- pas D gsjno: juag) Z
19 O- c( 2 v 4Z \ *
42 440-
Z
440-
4'
j j`
1 1 1 9 nguwff ff 1
SNVd JddV IVAO? RVO
1 13831S103? 1lAl0 ( 133NIDN3 _
vo DIV AM3
isici AiNnoo * 31noa
11WI "
Ls I aul- 10,
0 -
xojdd
m
0-- b' 0-
4 P P- j - r\
L+ 0q. DjS1%
0000
CA 00
409 + DA 11
0 0 0
0 m
cu
0 <
402L 440-
I.__ c6 0-- Ito « Od Sd/ NVdS

MINION AMMI
L coz Ito — I, 4N 40-
I, 60Z cc0 _
026 0-, mSD@VIIIIII , G_ buop LS I qui -

ON GIROS
A08d 3I'
9+ 00. c009 % On l GJD 10 D G5UDq: Z- = 00' DIS/%
Csl N
IJ C) CP4 CA CA
0c14 + CD 0
0 b+ 6 + cn
0 QO 0 D 0(
CD 1 c;
m
cu < m
n n
F
P 8 0/ t+ = 969' DjS/% 00
0-) V c00 - DA
Ow
o 2/'
jr\
00 0
A@13 OL- * O*
wn4D (]
x
z
EXHIBIT D1:
40TH ST BRIDGE RAILING PAINTING PROJECT

LIMITS OF WORK AND NOTES
SHEET 1 OF 3

ALL BRIDGE RAILING (BOTH SIDES)

TO BE CLEANED AND REPAINTED

PER PROJECT SPECIFICATIONS
CHAINLINK RAILING - 473'

UPRR ROW
CHAINLINK RAILING - 202'
STEEL RAILING - 296'
STEEL RAILING - 356'
STEEL RAILING - 455'
STEEL RAILING - 204'
NOTES:

1. NO PERSONNEL, MATERIALS, OR
EQUIPMENT ALLOWED IN UPRR RIGHT-OF-WAY (ROW).

2. NO PAINTING ACCESS FROM BELOW BRIDGE.

3. DIMENSIONS SHOWN ARE APPROXIMATE.

CONTRACTOR TO FIELD VERIFY.

DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E t.•.
0 ti• M
95 J0
9tr
133HS
DrU 3711VU J8 ON * 02i ` WO662- VINHOJIYw i
O •
NrfHOCW3H
M ONrM ) SWJM NON L
4MV lMHLQ
ways SI1DjQa ON uZ '
6 Jo3 sl1UJll
10 u1040 1 lui- 6u110108 > gas ` U01040. IU13 6u111Dd > aq punoJ6 oows y}
splaM uo ayj6ulI1DJ IIDys palanaq IId •
posodxa sa6pa jo s1sod Jo SIIDJ Iloys aq pasnlpoJ Jo
g 11V
IOJIDJod of
adols
uo adols olJgoj `
Boys aq paoold
L M Uai. 6ulI1DJ sl
49 uaad IID 2 8/ 0„ slloq
o spJoc{ 11 snlpoJ sI
Jano L p5
Iloys aq juaq j1
snlpoJ L Og
Jo ssaI
DUJ -- aq /
uo g
sadld IojuozlJOH •
IUawu6110 SIsod •
1104S aq loollJan
puo jJan 1D0.
g 6UII1D8 11oyS WJOjUoo 01 IoluozlJoy
uolloolgoj
pazlUonlD6 J9110
b 6u1I1DN Alquuasso Idaoxa uloyo MUII olJgDj of aq
ways ON L - 6ulllod sI1DIG(]
1a91CK
I1DIO(]. aas 2 JO3 iV
ON Z -
ways .

Z JOJ I1019C]. a
aas `` Uloyo. 1 iul- 6u11i08 ) slloIaQ
198ys Bullroda SI1DlaCJ
aas
9,
PuD 110190t 3
4,
I, 4 Jo, aar
IlD} o g `, 0j0 I! go 11DJOGs ' 3
ION s
ZI L/
oid nr43 IV Ltro' 1
1M101 Oad 103' ON Sl '
LSIQ Nf10 : V. 102! . 31(
S3lINI1SOd 133HS 1V101
3TlVkek83W3 VO ` V6 209-
1N3V4l8Vd3a 30 onend smoM
10 A1. 3Q IM83VU 31-
doo Jo Ionba
0999# 9
Gx. UOJAd , Iopic, Isod
Z
131VO ddd
TVf4iDiNU 31VOS Si N1 NI 53K)
I
1 NO - a3ona3N SNVId O
3JLva I, : Z l/ 0 C6/
33YOS sV ' PQION
103HO a> A8 d .* A. 0'
NOISIA38 . S
a3NDIS3a A8 W ' M *
NMV80 7A8 MOL
I. uz/ IL - uoNMVA313 0 NVW Nfc omvu
U tV, if16, V
w
ajaJouOo JalJJoe
l sdA. 9Z
4 9L81.'
x 2
x Sl 5
wolloa
110J
CKI)
JUOA 2 06ce/
Sl 2
x
5 x
5L8VO
dol of 11 s
Sl V x t
x VO 9L2
cw
SaiJDR 609 9 -- UD « p
Sl ) 6 X'
L L 69z/ dAl)
d lad L PSS /
CM OIK3FfVWn
w v " "" Ic IC M_ m t .:
x .
rt
MSYM SVM0Hi V 000 ONI
puo salJon
jou unnoys
91oN uCd : wo. Iop! sod dDo }
ON aIpDS
WOk" SWJL3a
d Lad
az• — t/
L 6
X
x
x
x

PAINT ALL METAL SURFACES OF CHAINLINK RAILING
(EXCEPT BOLTS AND NUTS)
NOTES:

1. PAINT BOTH SIDES (ALL SURFACES) OF
CHAINLINK RAILING, EXCEPT AS NOTED.

NO PAINT
ON

CONCRETE

COLUMNS
(TYP)

NO PAINT ON

LIGHT FIXTURES
(TYP)
EXHIBIT D1:
40TH ST BRIDGE RAILING PAINTING PROJECT

CHAINLINK FENCING DETAIL
SHEET 2 OF 3
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E i mn ngnnnm cmwiA 0 t Z
311VU83W3 J8 ON ' 0££ * 66F- bIN2i0indo 95
Obd J.' N Md '
mas eNrm swi3a L •
s J..
3llWl2l3W3Cis
d3 6 8091
1N3WlaVd3o 0 IlBfld 210M S 1p I AJ. 0 3llUVl213W3
31da l : Z l/ 0 C6/
os aav pais uvs • 3cor cruse • ' sor) ss ( camJo s M Nvs asor orua3d ' rtvs ` sv r aw+ tNaMvaars a S2 t tVdgRlflw ld ' ln'' St M1V15NCo Jl Nq igN3 '
V" 18' SYMOHI ) Vi iN :
0 31vOs sy : oN pa}
03Na3H 8 d I'
8 321 SNOISU 31da ddV
Q3NJIS3a A8 M*'
133HS
NMv80 le 1 M'
i 1
0 00
9 a
L tcZ/ L --- no —.

W. NOLLVA
09 puo- JDn sa! I
I
t
pup Jon sa!
0 6u3 aaau} s',.
lonoJddo
Jot
palliwgns Aq ooJjuoo Jo}
09 9111 an11ou slIo19p ADW aq
1991S 02j 6ull! Wll
s}! Jo
JOJ
supld
t, aaS ' 96P1J8
41oows
splaM uo ay}
6ullloJ Ilo4s aq
punoJ6
palanaq JIVJo
11o4s aq pasnjpnJ oJ sl!
pasodxa sa6pa jo s1sod Jo C IId •
o91, ,
rjano
si
snipoJ
ji
spJo4o
ig
ADw -- aquo
ssal
Jo L iog p .
snlpDj Ilo4s aq juaq
sadid
IoIuozlJoH •
Ilo4s aq
I0o11Jan SISOd •
luGwu6ll0
puo I0311J9n
Z p8 • I! 6u!
II04s WJojuoo 01 IOIUOZIJ04
to Jal j Jgo uoljoo!
pazluonlo6
L 08 • 6ull! Alquuasso of aq
salon
40 va .
11Aq a`
p '
413
S' vN3Ni '
L
1 ) L
1V10J ON133P021d UH '
S3M1SOd 133HS I101 1
sMnd lvnoaadv 31va
Z 2 / 26 /
32131Sg32J iIAIJ 2133NgN3 '
ktf
070"
lis
IV200.
prv,
zill —(., u^ 16—, 64V
101 IV adAiL 9Z
alaJouoB J91JJo8 L --, no
g Ino ; 4SDM Ja WDr •. u nI
0104 w bsso` i.•
L tis 008/
JDJJouu : pod L F,,
Y
ot
rww
C 9/ 0.
juan dj `
L g 0« sal04
Sl xIV 1 c 0xRxt/ a8 --, M 41!
palana8
Ja4soM
c n */ Iloq 2 ! poaJgl .
r g/
Juan „ Sl XC
Sl XIV
6uoJjS.
x adld C t/
i ti: LX9 jxz go_ t,
Isod doo
IopluJOJfCd «
9x.
0999# 9
Job L
awl gZ
910Jou00 iog Ja
08 UJOIJ, oN I!
CKJ) }
uan 2 0648/
JD8 l Z/
D
6uoJlc---
x adld C IV/
Sl Xt
dol liod
Isod do8
o
f999# 9 Cd IopluJOJ
ro vI i11N3
71SJO AlNfW 31f10H
x
x
X
x EXHIBIT D1:
40TH ST BRIDGE RAILNG PAINTING PROJECT

STEEL FENCING DETAIL
SHEET 3 OF 3
NOTES:

1. PAINT BOTH SIDES (ALL SURFACES) OF
STEEL RAILING, EXCEPT AS NOTED.

PAINT ALL METAL SURFACES OF STEEL RAILING
(EXCEPT BOLTS AND NUTS)

NO PAINT
ON

CONCRETE

COLUMNS
(TYP)

PAINT METAL

SURFACES
(TYP)

NO PAINT ON

LIGHT FIXTURES
(TYP)
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E /80(&675((7/,*+7/('
5(752),7352-(&7
1 of 17

CITY OF EMERYVILLE, CA

DEPARTMENT OF PUBLIC WORKS
PROJECT NO. EPW 106-16
In accordance with Section 7-7.01(c) of Chapter 7 of Title 7 of the Emeryville Municipal Code, as City Engineer for the City of Emeryville, I do hereby exercise the discretion delegated to me and approve the plan or design of a construction of, or an improvement to, public property to which this statement and my signature is affixed.

Executed this ___ day of ___________, ______.
________________________________________________
Maurice Kaufman, City Engineer CE# 43680
(SEE NOTE 2) (Typical height +/- 26') 17'-6") TOTAL: 493 EA 94 EA 164 EA 161 EA 0 70 EA 4 EA TYPE OF LIGHT POLE QUANTITY TO BE PAINTED

2. PAINTING OF SINGLE PEDESTAL FIXTURE STREET LIGHT POLES SHOWN ON SHEET 15 IS INCLUDED AS PART OF EXHIBIT D1: 40TH STREET BRIDGE RAILING PAINTING.

Double fixture (Typical height +/- 26')
NOTES:

1. ALL LUMEC LIGHT POLES SHOWN WITHIN LIMITS OF WORK AND IDENTIFIED IN SHEETS 2-17 TO BE PREPPED AND PAINTED ACCORDING TO PROJECT SPECIFICATIONS.

EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 1 OF 17

LIMITS OF WORK
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E A1
B1
A2
B2
61-5447
61-5440
61-5434
61-5432
61-5418
Frontage
67th
66th
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE

EMERYVILLE, CALIFORNIA
Date Saved: 10/5/2016 2:37:33 PM A1 Authors: K Nelson, J Ballou 2 of 17
BASE BID BASE BID BASE BID BASE BID BASE BID(These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 2 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E A2
B2
A1
B1
61-5440
21-6512
46-4995
21-6509
21-6508
21-6501
21-6513
21-6511
21-6510
66th
67th
65th
Hollis
Vallejo
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE

EMERYVILLE, CALIFORNIA
Date Saved: 10/5/2016 2:37:33 PM A2 Authors: K Nelson, J Ballou 3 of 17
ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 (These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 3 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E B1
C1
A1
B2
A2
C2
20-5667
32-5673
61-5422
20-5669
20-5665
20-5671
32-5675
61-5436
65th
Frontage
64th
Christie
La Coste
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE

EMERYVILLE, CALIFORNIA
Date Saved: 10/5/2016 2:37:33 PM B1 Authors: K Nelson, J Ballou 4 of 17
ALT BID ITEM A2.1 ALT BID ITEM A2.1 ALT BID ITEM A2.1 ALT BID ITEM A2.1 ALT BID ITEM A2.2 ALT BID ITEM A2.2 BASE BID(These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 4 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E B2
C2
A2
B1
A1
C1
21-6503
61-5461
61-5410
61-5412
21-6504
61-5453
46-4995
61-5451
21-6501
61-5422
61-5457
46-4999
21-6505
61-5455
46-4997
61-5414
61-9072
21-6506 21-6502
61-5436
64th
63rd
Hollis
62nd
Doyle
65th
61st
Ocean
Shellmound
Overland
64th
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE

EMERYVILLE, CALIFORNIA
Date Saved: 10/5/2016 2:37:33 PM B2 Authors: K Nelson, J Ballou 5 of 17
BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.1 ALT BID ITEM A2.1 ALT BID ITEM A2.1 ALT BID ITEM A2.2 (These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 5 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E *# *#
*#
*#
*#
*#
*#
*#
*#
*#
*#
*#
C1
B1
D1
C2
D2
B2
40-5903
32-5847
40-5906
32-5679
40-5702
40-5905
32-5677
32-5683
32-5670
40-5907
40-5703
40-5904
32-5888
32-5681
62-5848
40-5701
Christie
Frontage
Powell
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE Date Saved: 10/5/2016 2:37:33 PM
EMERYVILLE, CALIFORNIA C1 Authors: K Nelson, J Ballou
6 of 17
ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.3 ALT BID ITEM A2.2 (These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 6 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E *#
*#
*#
*#
*#
C2
B2
D2
C1
D1 D3
B1
48 47-2
47-5
47-4
47-7
47-1
47-3
47-6
47-16
47-17
46-5676
58-9065
56-5741
61-5483
46-5666
46-5682
46-5668
16-5732
56-5738
47-5902
61-5489
62-5851
61-5488
16-5736
56-5735
16-5738
46-5678
46-5664
61-5470
16-5730
47-5904
46-5684
16-5731
46-5669
61-5850
46-5667
56-5737
47-5903
61-5487
56-5734
56-5740
46-5665
46-5680
56-5739
56-5733
62-5848
46-5686
46-5670
56-5736
16-5778
Powell
Hollis
Horton
59th
Shellmound
Peladeau
Doyle
62nd
Haruff
61st
Stanford
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE Date Saved: 10/5/2016 2:37:33 PM
EMERYVILLE, CALIFORNIA C2 Authors: K Nelson, J Ballou
7 of 17
Rotate electrolier arms
90 degrees to align
parallel with street
centerline
ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.2 ALT BID ITEM A3.2 ALT BID ITEM A3.2 ALT BID ITEM A3.2 ALT BID ITEM A3.2 ALT BID ITEM A3.2 ALT BID ITEM A3.2 ALT BID ITEM A3.2 ALT BID ITEM A3.2 ALT BID ITEM A3.2 ALT BID ITEM A3.2 ALT BID ITEM A3.1 BASE BID BASE BID BASE BID ALT BID ITEM A2.2 ALT BID ITEM A2.2 BASE BID BASE BID BASE BID (These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 7 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E *#
D1
C1
D2
E2
C2 40-5903
32-5835
32-5834
32-5846
32-5868
Powell Christie
Frontage
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE Date Saved: 10/5/2016 2:37:33 PM
EMERYVILLE, CALIFORNIA D1 Authors: K Nelson, J Ballou
8 of 17
ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 (These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 8 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E *#
*#
*#
*# *#
*#
*#
*#
D2
E2
C2
D1 D3
E3
C1
47-9
47-8 64-18
64-19
47-11
47-15
47-16
47-10
47-14
47-12
64-20
47-13
61-5445
61-5446
47-5676
47-5687
46-5651
13-5668
47-5695
46-5654
64-5658
47-5688
47-5692
61-5899
46-5643
46-5648
13-5662
32-5835
32-5838
47-5680
61-5413
47-5691
13-5675
46-5655
64-5697
46-5650
46-5645
32-5846
61-5425
47-5689
13-5669
61-5898
64-5700
46-5644
46-5649
47-5694
61-5441
46-5656
47-5686
61-5428
13-5671
64-5699
46-5647
47-5693
46-5646
32-5840
47-5685
64-5674
47-5681 46-5653
46-5640
13-5670
64-5696
32-5836
32-5868
64-5705
61-5442
46-5642
32-5845
64-5704
47-5684
61-5420
47-5690
46-5670
64-5698
46-5663
47-5683
64-5672
Horton
Hollis
Shellmound
53rd
Christie
Stanford
13-56
13-566613-5664
13-56
46-5652
13-5673
13-5667
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE Date Saved: 10/5/2016 2:37:33 PM
EMERYVILLE, CALIFORNIA D2 Authors: K Nelson, J Ballou
9 of 17
ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A2.2 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 ALT BID ITEM A2.2 (These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 9 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E D3
E3
D2 D4
E2 E4
C2
60-3
60-1
60-2
60-4
60-35
46-5651
60-5740
46-5818
46-5654
46-5912
46-5822
13-5662
46-5825
46-5794
46-5815
60-5741
46-5655
46-5650
13-5660
46-5820
46-5649
46-5817
46-5656
46-5827
46-5661
46-5657
46-5824
13-5665
46-5653
46-5821
60-5739
46-5826
46-5816
46-5819
46-5659
13-5667 60-5742
46-5823
53rd
55th
54th
47th
San Pablo
Doyle
Emery Bay
Boyer
Vallejo
Temescal
Beaudry
Fremont
Doyle
6-5652
60-5
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE Date Saved: 10/5/2016 2:37:33 PM
EMERYVILLE, CALIFORNIA D3 Authors: K Nelson, J Ballou
10 of 17
ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 ALT BID ITEM A3.1 (These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 10 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E D4
E4
D3
E3
60-5
60-7
60-3
60-8
60-6
60-2
60-4
60-34
60-32
60-35
60-31
60-33
60-28
60-30
60-5769
60-5475
60-5741
60-5744
60-5768
60-5770
60-5743
60-5746
60-5771
60-5772
60-5742
47th
45th
48th
Adeline
46th
Salem
Essex
45th
Salem
5740
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE Date Saved: 10/5/2016 2:37:33 PM
EMERYVILLE, CALIFORNIA D4 Authors: K Nelson, J Ballou
11 of 17
ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 (These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 11 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E *#
*#
*#
*#
*#
*#
*#
*#
*#
*#
*#
E2
F2
D2
E3
F3
D1 D3
61-5415
61-5439
61-5421
48-5707
48-5709
61-5409
61-5893
41-5722
61-5425
61-5408
61-5894
61-5423
48-5710
61-5444
61-5429
61-5417
61-5433
61-5891
61-5419
48-5708
41-5723
48-5711
Horton
Park
Shellmound
Sherwin
Hubbard
Halleck
45th
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE

EMERYVILLE, CALIFORNIA
Date Saved: 10/5/2016 2:37:33 PM E2 Authors: K Nelson, J Ballou 12 of 17
ALT BID ITEM A8.1 ALT BID ITEM A8.1 ALT BID ITEM A8.1 ALT BID ITEM A8.1 ALT BID ITEM A8.1 ALT BID ITEM A8.1 ALT BID ITEM A8.1 BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID(These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 12 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E *#
*#
*#
*#
*#
*#
*#
*#
*#
*# *#
*#
*#
*#
*#
*#
E3
F3
D3
E2 E4
F2 F4
D2 D4
5882
5877
36-6
36-7
5878
5875
5876
36-8
5880
9-301
4-5562
4-5559
4-5567
4-5565
4-5563
4-5557
4-5569
4-5564
4-5558
4-5561 4-5560
54-5866
46-5806
54-5781
46-5812
46-5912
54-5786
54-5789
46-5804
46-5830
46-5909
46-5815
54-5785
44-5879
54-5864
54-5783
44-5885
46-5792
46-5832
46-5829
46-5799 54-5784
54-5861
54-5869
54-5788
54-5792
46-5807
46-5802
46-5827
46-5809
46-5793
44-5881
46-5790
54-5787
54-5870
44-5873
46-5803
46-5831
46-5797
46-5814
54-5862
54-5865
54-5859
44-5872
46-5908
54-5791
46-5808
46-5749
46-5811
46-5800
46-5795
54-5860
44-5871
54-5790
46-5801
46-5810
46-5796
46-5910
46-5791
46-5805
54-5782
44-5874
46-5828
46-5798
46-5911
46-5813
54-5863
45th
Park
Hollis
Watts
40th
Holden
Harlan
Doyle
Horton
Emery
44-5884
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE

EMERYVILLE, CALIFORNIA
Date Saved: 10/5/2016 2:37:33 PM E3 Authors: K Nelson, J Ballou 13 of 17
Salvage undamaged
fixture heads at City
Corporation Yard
ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A9.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A4.1 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A8.3 ALT BID ITEM A8.3 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A8.2 ALT BID ITEM A8.1 ALT BID ITEM A8.2 ALT BID ITEM A8.2 ALT BID ITEM A8.2 ALT BID ITEM A8.2 ALT BID ITEM A8.2 ALT BID ITEM A8.2 ALT BID ITEM A8.2 ALT BID ITEM A8.1 ALT BID ITEM A8.2 ALT BID ITEM A8.2 ALT BID ITEM A8.2 ALT BID ITEM A8.1 ALT BID ITEM A8.1 ALT BID ITEM A8.1 (These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 13 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E *#
*#
*#
*#
*#
*#
*#
*#
*#
*#
*#
*#
*#
*#
E4
F4
D4
E3
F3
D3
36-2
36-6
36-7
60-9
36-3
60-8
36-4
36-1
36-8
60-22
60-18
60-15
60-21
60-24
60-23
60-11 60-25
60-14
60-16
60-19
60-12
60-26
60-17
60-20
60-27
5-6105
4-5574
4-5577
5-6108
4-5568
4-5573
4-5571
4-5572
4-5579
4-5564
5-6106
5-6107
4-5575
4-5570
4-5581
4-5566
5-6104
54-5858
54-5781
60-5578
60-5747
60-5758
60-5750
60-5764
36-5619
54-5780
60-5748
60-5756
36-5620
60-5751
60-5765
60-5761
60-5576
60-5581
60-5753
60-5757
60-5767
60-5763
60-5583
54-5779
60-5759
60-5749
60-5766
54-5859
60-5580
60-5754
60-5760
60-5529
60-5762
60-5585
60-5752
60-5755
40th
43rd
Adeline
41st
San Pablo
Emery
Park
Salem
Essex
45th
44th
42nd
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE

EMERYVILLE, CALIFORNIA
Date Saved: 10/5/2016 2:37:33 PM E4 Authors: K Nelson, J Ballou 14 of 17
Salvage
undamaged
fixture
heads
at City
Corporation
Yard
ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A9.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.2 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A5.1 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A9.1 ALT BID ITEM A9.1 ALT BID ITEM A9.1 ALT BID ITEM A9.1 ALT BID ITEM A9.1 ALT BID ITEM A9.1 ALT BID ITEM A9.1 ALT BID ITEM A9.1 (These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 14 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E *#
*#
*#
*#
*#
*#
*#
*#
*#
*# *#
*#
F2
E2
F3
E3
4-5534
4-5500
4-5494
4-5511
4-5541
4-5533
4-5495
4-5517
4-5522
4-5530
4-5510
4-5493
4-5537
4-5524
4-5505 4-5499 4-5514 4-5516
4-5531
4-5525
4-5515
4-5506
4-5520
4-5527
4-5543
4-5507
4-5496
4-5502
4-5501
4-5512
4-5498
4-5503
4-5509
4-5504
4-5519
4-5532
4-5492 4-5513
4-5508
4-5535
61-5403
61-5404
61-5409
61-5438
61-5408
61-5426
61-5405
61-5401
61-5406
61-5400
61-5407
40th
Halleck
Park
Hubbard
4-5497
4-5526
4-5518
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE

EMERYVILLE, CALIFORNIA
Date Saved: 10/5/2016 2:37:33 PM F2 Authors: K Nelson, J Ballou 15 of 17
Pedestal lights ( ) will not
receive photocell retrofits
ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID BASE BID

PAINTING OF SINGLE PEDESTAL FIXTURE STREET
LIGHT POLES ON 40TH STREET BRIDGE IS INCLUDED AS PART OF EXHIBIT D1: 40TH STREET BRIDGE RAILING PAINTING (These are now double fixtures) NIC

NIC NIC NIC NIC
NIC
EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 15 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E *#
*#
*#
*#
*# *#
*#
*#
*#
*#
*#
*#
*#
*#
*#
*# *#
*#
*#
*#
*#
*#
*#
*#
*#
*#
F3
E3
F2 F4
E2 E4
5882
5883
5880
4-5542
4-5534
4-5550
4-5559
4-5536
4-5556
4-5553
4-5545
4-5546
4-5552
4-5557
4-5538
4-5549
4-5558
4-5544
4-5543
4-5561
4-5551
4-5555
4-5554
4-5540
4-5547
4-5548
4-5560
46-5633
46-5639
46-5634
46-5637
44-5885
4-55500
46-5631
46-5641
44-5881
46-5632
46-5749
46-5795
46-5636
46-5635
40th
Horton
Hollis
Yerba Buena
Holden
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE

EMERYVILLE, CALIFORNIA
Date Saved: 10/5/2016 2:37:33 PM F3 Authors: K Nelson, J Ballou 16 of 17
Confirm scope with
City's Representative,
prior to starting work
on this pole
ALT BID ITEM A8.2 ALT BID ITEM A8.1 ALT BID ITEM A8.1 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 ALT BID ITEM A7.1 (These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 16 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E *#
*#
*#
*#
*#
F4
E4
F3
E3
24-2 24-1
36-5625
60-5578
60-5602
60-5597
36-5619
60-5584
60-5601
60-5608
60-5605
60-5591
60-5582
36-5620
60-5614
60-5596
60-5593
36-5629 60-5603
36-5628
60-5615
60-5588
60-5609
60-5587
60-5599
60-5613
36-5630
60-5586
60-5610
60-5607
60-5589
36-5623
60-5592
60-5580
60-5616
36-5624
60-5604
60-5595
36-5621
36-5626
60-5590
60-5617
60-5606
60-5594
60-5585
60-5612
60-5598
36-5627
24-00241
Adeline
San Pablo
Emery
I- 580
36th
Macarthur
39th
Peralta
37th
Watts
Apgar
Yerba Buena
36th
60-5611
Type of Lumec Candela Fixture
Single fixture
Single fixture on pole with banner arms
Single pedestal fixture
Double fixture
Double fixture on pole with traffic signal equipment and wiring *# Triple fixture
± LUMEC STREETLIGHT LED RETROFIT PROJECT
0 200 400 100
Feet DEPARTMENT OF PUBLIC WORKS
1333 PARK AVENUE

EMERYVILLE, CALIFORNIA
Date Saved: 10/5/2016 2:37:33 PM F4 Authors: K Nelson, J Ballou 17 of 17
ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.2 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A6.1 ALT BID ITEM A6.1 (These are now double fixtures) EXHIBIT D2: LUMEC LIGHT POLE PAINTING LOCATIONS
SHEET 17 OF 17
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Presentation
Emeryville City LCP version of LMS10760 & 7976 (10269)
[CAND2-009]-40W42LED4K-R-PC-C-RLE3-120-SPW-[B-LCP-144]-2-90deg-[BA-068]-RC-SSM8V-20-[BA-067]-IP-GN4TX CAND2-009-TA-56931-10269-IT 20121004_120554.DOCX
640, Curé-Boivin
Boisbriand (Québec)
Canada, J7G 2A7
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 1 OF 18

SINGLE FIXTURE ON POLE
DETAIL

PAINT ALL METAL SURFACES

OF LIGHT POLE

INCLUDING BANNER ARMS, WHERE PRESENT

REMOVE BOOT

PRIOR TO
PAINTING POLE;

PAINT BOOT

SEPARATELY AND
REPLACE;

NO PAINT ON

FASTENERS

NO PAINT ON

LIGHT FIXTURE
(LUMINAIRE)

NO PAINT ON LIGHT

SENSOR AT TOP OF
POLE
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Presentation
Emeryville City LCP version of LMS10760 & 7976 (10269)
[CAND2-009]-40W42LED4K-R-PC-C-RLE3-120-SPW-[B-LCP-145]-1A-SSM8V-23-[BA-069]-IP-RC-GN4TX CAND2-009-TA-56933-10269-IT 20121004_120445.DOCX 640, Curé-Boivin
Boisbriand (Québec)
Canada, J7G 2A7
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 2 OF 18

PAINT ALL METAL SURFACES

OF LIGHT POLE

INCLUDING BANNER ARMS AND MAST ARMS, WHERE PRESENT

REMOVE BOOT

PRIOR TO
PAINTING POLE;

PAINT BOOT

SEPARATELY AND
REPLACE;

NO PAINT ON

FASTENERS

NO PAINT ON

LIGHT FIXTURE
(LUMINAIRE)

NO PAINT ON

LIGHT FIXTURE
(LUMINAIRE)

NO PAINT ON LIGHT

SENSOR AT TOP OF

POLE DOUBLE FIXTURE ON POLE DETAIL
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E City of Emeryville City – Decorative LED Conversion Project Philips Lumec single-wbanner-rotatedoptic.DOC
12-06-2016 Page 7 / 7
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 3 OF 18

SINGLE FIXTURE ON POLE WITH BANNER ARMS
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City (10269)
single-wobanner-stdaiming.DOC
12-06-2016 Page 1 / 7
Qty 1 Luminaire [CAND2-014]-40W42LED4K-R-PC-C-RLE3-120-GN4TX Description of Components:

Guard: In a round shape, this guard is made of bent 6063-T5 aluminum 1/2" (13mm) rods mechanically assembled to the access-mechanism.

Skirt: Spun 1100-0 aluminum, mechanically assembled on the luminaire.

Access-Mechanism: Rotomatic, die-cast A360 aluminum quarter-turn mechanism with constant-pressure spring-loaded points. The mechanism shall offer tool-free access to the inside of the luminaire. An embedded memory-retentive gasket shall ensure weatherproofing. A red key on the unit shall indicate point of engagement.

Light Engine: EcoSwap Rotomatic tool-free system composed of 4 main components: Heat Sink / LED lamp / Optical System / Driver
Electrical components are RoHS compliant.

Heat Sink: Made of extruded aluminum optimising the LEDs efficiency and life. Product does not use any cooling device with moving parts (only passive cooling device)
Globe: (PC-C), Made of one-piece seamless injected-moulded clear polycarbonate. The globe is assembled on the access-mechanism.

Lamp: LED Module (Included), LED type Philips Lumileds LUXEON R. Composed of 42 high-performance white LEDs, 40w lamp wattage. Color temperature of 4000 Kelvin nominal, 70 CRI. Operating lifespan based on TM-21 extrapolation to get results after which 50% of LEDs still emits over 70% (L70) of its original lumen output. Use of metal core board ensures greater heat transfer and longer lifespan of the light engine.

Optical System: (RLE3), IES type III (asymmetrical). Composed of high-performance acrylic refractor lenses to achieve EPA: 1.85 sq ft / weight: 44 lb (20 kg)
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 4 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City (10269)
single-wobanner-stdaiming.DOC
12-06-2016 Page 2 / 7
optimized distribution and get maximum spacing. target lumens will create a perfect lighting uniformity. Performance shall be tested per LM-63, LM-79 and TM-15 (IESNA) certifying its photometric performance. Painted color grey.

Driver: High power factor of 90%. Electronic driver, operating range 50/60 Hz. Auto-adjusting to a voltage between 120 and 277 volt AC rated for both application line to line or line to neutral, Class II, THD of 20% max. Maximum ambient operating temperature from -40F(-40C) to 130F(55C) degrees. Certified in compliance to cULus requirement. Dry and damp location. Assembled on a unitized removable tray with Tyco quick disconnect plug resisting to 221F(105C) degrees.

The current supplying the LEDs will be reduced by the driver if the internal driver temperature exceeds 185F(85C), as a protection to the LEDs and the electrical components. Output is protected from short circuits, voltage overload and current overload. Automatic recovery after correction.

Surge Protector: Surge protector tested in accordance with ANSI/IEEE C62.45 per ANSI/IEEE C62.41.2 Scenario I Category C High Exposure 10kV/10kA waveforms for Line-Ground, Line-Neutral and Neutral-Ground, and in accordance with U.S. DOE (Department of Energy) MSSLC (Municipal Solid-State Street Lighting Consortium) model specification for LED roadway luminaires electrical immunity requirements for High Test Level 10kV / 10kA.

Fitter: Cast aluminum 356 c/w 4 set screws 3/8-16 UNC. Fits on a 4"(102mm) outside diameter by 4"(102mm) long tenon.

Luinaire Options: (SPW), White color for inside of reflector as per old standard.

IMPORTANT NOTE: Due to the combination of the Ecoswap and the mounting arms welded on the fitter, the Street Side is specific to each fixture number, as shown in the fixture drawing, and cannot be re-oriented in the field.

Please validate the street side required prior to ordering. Thank you.

EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 5 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City (10269)
single-wobanner-stdaiming.DOC
12-06-2016 Page 3 / 7
Configuration
Qty 1 Bracket [B-LCP-215]-1A-90deg-RC-GN4TX
Description of Components:

Arm: Twin arms made of rectangular aluminum tubing 6061-T6 2" x 3" (51mm x 76mm), having a 1/8" (3mm) wall thickness, complete with an access door covering a 2 1/4" x 2 7/8" (57mm x 73mm) opening.

Decorative Element: Bent decorative aluminum rod, 6063-T5 alloy, 1/2" (13mm) outside diameter, welded assembly.

Central Adaptor: Made of aluminum 6061-T6, 4" (102mm) outside diameter, complete with a tenon penetrating 12" (305mm) inside the pole. The tenon shall be mechanically fastened to the pole by two sets of three set-screws at 120 degrees around the pole.

Bracket Options: (90deg),Bracket to be oriented at 90 degree from access door. (RC),Receptacle for twist lock type photocell, accepts up to 480 volt. (Cell not included)
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 6 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City (10269)
single-wobanner-stdaiming.DOC
12-06-2016 Page 4 / 7
Description of Components:

Pole Shaft: Shall be made from a 4" (102mm) round high tensile carbon steel tubing, having a 0.125" (3.2mm) wall thickness, welded to the pole base.

Joint Cover: Two-piece round joint cover made from cast 356 aluminum, mechanically fastened with stainless steel screws.

Pole Base: Shall be made from a 8 5/8" (219mm) round high tensile carbon steel tubing base having a 0.180" (4.6mm) wall thickness, welded to both the bottom and top of the anchor plate.

Maintenance Opening: The pole shall have a 4 1/2" x 10" (114mm x 254mm) maintenance opening centered 25 1/4" (641mm) from the bottom of the anchor plate, complete with a weatherproof embossed aluminum cover and a copper ground lug.

Base Cover: Two piece round base cover made from cast 356 aluminum, mechanically fastened with stainless steel screws.

Pole Options: (FS1) Single fuse and fuse-holder, fuse is to feed Luminaire only. (IP) The pole inner wall will be painted.

IMPORTANT: Philips Lumec strongly recommends the installation of the complete lighting assembly with all of its accessories upon the anchoring of the pole. This will ensure that the structural integrity of the product is maintained throughout its lifetime.

Pole Weight: 88 lbs (40 kg)
Qty 1 Pole SM8F-13-FS1-IP-GN4TX
For 3/4" (19mm)Ø anchor bolts, not
included. Important: Do not obstruct
space between anchor plate and
concrete base.
-Bolt Circle:

- Thickness:
3/4"(19mm)
- NOTE:

Bolt Circle Allowed:
11" to 13"
279mm to 330mm
Base & Bolts Information Anchor Plate Free opening
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 7 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City (10269)
single-wobanner-stdaiming.DOC
12-06-2016 Page 5 / 7
Description of Components:

Hardware: All exposed screws shall be stainless steel with Ceramic primer-seal basecoat to reduce seizing of the parts. All seals and sealing devices are made and/or lined with EPDM and/or silicone.

Finish: Color to be blue green textured (GN4TX) and in accordance with the AAMA 2603 standard. Application of polyester powder coat paint (4 mils/100 microns) with ± 1 mils/24 microns of tolerance. The Thermosetting resins provides a discoloration resistant finish in accordance with the ASTM D2244 standard, as well as luster retention in keeping with the ASTM D523 standard and humidity proof in accordance with the ASTM D2247 standard.

The surface treatment achieves a minimum of 2000 hours for salt spray resistant finish in accordance with testing performed and per ASTM B117 standard.

LED products manufacturing standard: The electronic components sensitive to electrostatic discharge (ESD) such as light emitting diodes (LEDs) are assembled in compliance with IEC61340-5-1 and ANSI/ESD S20.20 standards so as to eliminate ESD events that could decrease the useful life of the product.

Quality Control: The manufacturer must provide a written confirmation of its ISO 9001-2008 and ISO 14001-2004 International Quality Standards Certification.

Web site information details: Click on any specific information details you need:

Paint finish / Warranties / ISO 9001-2008 Certification / ISO 14001-2004 Certification / cULus Certification / CSA Pole Certification
Miscellaneous
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 8 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City (10269)
single-wobanner-stdaiming.DOC
12-06-2016 Page 7 / 7
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 9 OF 18

SINGLE FIXTURE ON POLE
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City (10269)
single-wobanner-rotatedoptic.doc
12-06-2016 Page 1 / 7
Qty 1 Luminaire [CAND2-013]-40W42LED4K-R-PC-C-RLE3-120-SPW-GN4TX Description of Components:

Guard: In a round shape, this guard is made of bent 6063-T5 aluminum 1/2" (13mm) rods mechanically assembled to the access-mechanism.

Skirt: Spun 1100-0 aluminum, mechanically assembled on the luminaire.

Housing: In a round shape, this housing is made of cast 356 aluminum, mechanically assembled to the bracket.

Access-Mechanism: Rotomatic, die-cast A360 aluminum quarter-turn mechanism with constant-pressure spring-loaded points. The mechanism shall offer tool-free access to the inside of the luminaire. An embedded memory-retentive gasket shall ensure weatherproofing. A red key on the unit shall indicate point of engagement.

Light Engine: EcoSwap Rotomatic tool-free system composed of 4 main components: Heat Sink / LED lamp / Optical System / Driver
Electrical components are RoHS compliant.

Heat Sink: Made of extruded aluminum optimising the LEDs efficiency and life. Product does not use any cooling device with moving parts (only passive cooling device)
Globe: (PC-C), Made of one-piece seamless injected-moulded clear polycarbonate. The globe is assembled on the access-mechanism.

Lamp: LED Module (Included), LED type Philips Lumileds LUXEON R. Composed of 42 high-performance white LEDs, 40w lamp wattage. Color temperature of 4000 Kelvin nominal, 70 CRI. Operating lifespan based on TM-21 extrapolation to get results after which 50% of LEDs still emits over 70% (L70) of its original lumen output. Use of metal core board ensures greater heat transfer and longer lifespan of the light engine.

EPA: 1.85 sq ft / weight: 44 lb (20 kg)
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 10 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City (10269)
single-wobanner-rotatedoptic.doc
12-06-2016 Page 2 / 7
Optical System: (RLE3), IES type III (asymmetrical). Composed of high-performance acrylic refractor lenses to achieve optimized distribution and get maximum spacing. target lumens will create a perfect lighting uniformity. Performance shall be tested per LM-63, LM-79 and TM-15 (IESNA) certifying its photometric performance. Painted color grey.

Driver: High power factor of 90%. Electronic driver, operating range 50/60 Hz. Auto-adjusting to a voltage between 120 and 277 volt AC rated for both application line to line or line to neutral, Class II, THD of 20% max. Maximum ambient operating temperature from -40F(-40C) to 130F(55C) degrees. Certified in compliance to cULus requirement. Dry and damp location. Assembled on a unitized removable tray with Tyco quick disconnect plug resisting to 221F(105C) degrees.

The current supplying the LEDs will be reduced by the driver if the internal driver temperature exceeds 185F(85C), as a protection to the LEDs and the electrical components. Output is protected from short circuits, voltage overload and current overload. Automatic recovery after correction.

Surge Protector: Surge protector tested in accordance with ANSI/IEEE C62.45 per ANSI/IEEE C62.41.2 Scenario I Category C High Exposure 10kV/10kA waveforms for Line-Ground, Line-Neutral and Neutral-Ground, and in accordance with U.S. DOE (Department of Energy) MSSLC (Municipal Solid-State Street Lighting Consortium) model specification for LED roadway luminaires electrical immunity requirements for High Test Level 10kV / 10kA.

Luminaire Options: (SPW), White color for inside of reflector as per old standard.

IMPORTANT NOTE: Due to the combination of the Ecoswap and the mounting arms welded on the fitter, the Street Side is specific to each fixture number, as shown in the fixture drawing, and cannot be re-oriented in the field.

Please validate the street side required prior to ordering. Thank you.

EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 11 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City (10269)
single-wobanner-rotatedoptic.doc
12-06-2016 Page 3 / 7
Configuration
Qty 1 Bracket [B-LCP-215]-1A-90deg-RC-GN4TX
Description of Components:

Arm: Twin arms made of rectangular aluminum tubing 6061-T6 2" x 3" (51mm x 76mm), having a 1/8" (3mm) wall thickness, complete with an access door covering a 2 1/4" x 2 7/8" (57mm x 73mm) opening.

Decorative Element: Bent decorative aluminum rod, 6063-T5 alloy, 1/2" (13mm) outside diameter, welded assembly.

Adaptor: Clamps made of cast 356 aluminum, mechanically fastened on the pole by stainless steel bolts and nuts.

Central Adaptor: Made of aluminum 6061-T6, 4" (102mm) outside diameter, complete with a tenon penetrating 12" (305mm) inside the pole. The tenon shall be mechanically fastened to the pole by two sets of three set-screws at 120 degrees around the pole.

Bracket Options: (90deg),Bracket to be oriented at 90 degree from access door. (RC),Receptacle for twist lock type photocell, accepts up to 480 volt. (Cell not included)
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 12 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City (10269)
single-wobanner-rotatedoptic.doc
12-06-2016 Page 4 / 7
Description of Components:

Pole Shaft: Shall be made from a 4" (102mm) round high tensile carbon steel tubing, having a 0.188" (4.8mm) wall thickness, welded to the pole base.

Joint Cover: Two-piece round joint cover made from cast 356 aluminum, mechanically fastened with stainless steel screws.

Pole Base: Shall be made from a 8 5/8" (219mm) round high tensile carbon steel tubing base having a 0.180" (4.6mm) wall thickness, welded to both the bottom and top of the anchor plate.

Maintenance Opening: The pole shall have a 4 1/2" x 10" (114mm x 254mm) maintenance opening centered 25 1/4" (641mm) from the bottom of the anchor plate, complete with a weatherproof embossed aluminum cover and a copper ground lug.

Base Cover: Two piece round base cover made from cast 356 aluminum, mechanically fastened with stainless steel screws.

Pole Options: (FS1) Single fuse and fuse-holder, fuse is to feed Luminaire only. (IP) The pole inner wall will be painted.

IMPORTANT: Philips Lumec strongly recommends the installation of the complete lighting assembly with all of its accessories upon the anchoring of the pole. This will ensure that the structural integrity of the product is maintained throughout its lifetime.

Pole Weight: 123 lbs (55.9 kg)
Qty 1 Pole SM8N-13-FS1-IP-GN4TX
For 3/4" (19mm)Ø anchor bolts, not
included. Important: Do not obstruct
space between anchor plate and
concrete base.
-Bolt Circle:

- Thickness:
3/4"(19mm)
- NOTE:

Bolt Circle Allowed:
11" to 13"
279mm to 330mm
Base & Bolts Information Anchor Plate Free opening
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 13 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City (10269)
single-wobanner-rotatedoptic.doc
12-06-2016 Page 5 / 7
Description of Components:

Hardware: All exposed screws shall be complete with Ceramic primer-seal basecoat to reduce seizing of the parts and offers a high resistance to corrosion. All seals and sealing devices are made and/or lined with EPDM and/or silicone and/or rubber.

Finish: Color to be blue green textured (GN4TX) and in accordance with the AAMA 2603 standard. Application of polyester powder coat paint (4 mils/100 microns) with ± 1 mils/24 microns of tolerance. The Thermosetting resins provides a discoloration resistant finish in accordance with the ASTM D2244 standard, as well as luster retention in keeping with the ASTM D523 standard and humidity proof in accordance with the ASTM D2247 standard.

The surface treatment achieves a minimum of 2000 hours for salt spray resistant finish in accordance with testing performed and per ASTM B117 standard.

LED products manufacturing standard: The electronic components sensitive to electrostatic discharge (ESD) such as light emitting diodes (LEDs) are assembled in compliance with IEC61340-5-1 and ANSI/ESD S20.20 standards so as to eliminate ESD events that could decrease the useful life of the product.

Quality Control: The manufacturer must provide a written confirmation of its ISO 9001-2008 and ISO 14001-2004 International Quality Standards Certification.

Web site information details: Click on any specific information details you need:

Paint finish / Warranties / ISO 9001-2008 Certification / ISO 14001-2004 Certification / cULus Certification / CSA Pole Certification
Miscellaneous
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 14 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City LCP version of LMS10760 & 7976 (10269)
Twin arm-pole.doc
12-06-2016 Page 1 / 5 640, Curé-Boivin
Boisbriand (Québec)
Canada, J7G 2A7
Configuration
Qty 1 Bracket [B-LCP-144]-2-90deg-[BA-068]-RC-GN4TX
Description of Components:

Arm: Twin arms made of rectangular aluminum tubing 6061-T6 2" x 3" (51mm x 76mm), having a 1/8" (3mm) wall thickness, complete with an access door covering a 2 1/4" x 2 7/8" (57mm x 73mm) opening.

Decorative Element: Bent decorative aluminum rod, 6063-T5 alloy, 1/2" (13mm) outside diameter, welded assembly.

Central Adaptor: Made of aluminum, 5 9/16" (141mm) O.D., c/w a tenon penetrating 12" (305mm) inside the pole, mechanically secured.

Bracket Options: (90deg),Bracket to be oriented at 90 degree from access door. (BA),Banner arm (RC),Receptacle for twist lock type photocell, accepts up to 480 volt. (Cell not included) EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 15 OF 18

DOUBLE FIXTURE ON POLE
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City LCP version of LMS10760 & 7976 (10269)
Twin arm-pole.doc
12-06-2016 Page 2 / 5 640, Curé-Boivin
Boisbriand (Québec)
Canada, J7G 2A7
Description of Components:

Pole Shaft: Shall be made from a 5 9/16" (141mm) round high tensile carbon steel tubing, having a 0.250" (6.4mm) wall thickness, welded to the pole base.

Joint Cover: Two-piece round joint cover made from cast 356 aluminum, mechanically fastened with stainless steel screws.

Pole Base: Shall be made from a 8 5/8" (219mm) round high tensile carbon steel tubing base having a 0.180" (4.6mm) wall thickness, welded to both the bottom and top of the anchor plate.

Maintenance Opening: The pole shall have a 4 1/2" x 10" (114mm x 254mm) maintenance opening centered 25 1/4" (641mm) from the bottom of the anchor plate, complete with a weatherproof embossed aluminum cover and a copper ground lug.

Base Cover: Two piece round base cover made from cast 356 aluminum, mechanically fastened with stainless steel screws.

Pole Options: (BA-067) Single banner arm made of steel tubing, 1 1/16" (27mm) outside diameter, breakaway type, mechanically assembled to the pole. (IP) The pole inner wall will be painted.

IMPORTANT: Philips Lumec strongly recommends the installation of the complete lighting assembly with all of its accessories upon the anchoring of the pole. This will ensure that the structural integrity of the product is maintained throughout its lifetime.

Qty 1 Pole SSM8V-20-[BA-067]-IP-GN4TX
For 1" (25mm)Ø anchor bolts, not
included. Important: Do not obstruct
space between anchor plate and
concrete base.
-B.C.:

- Thickness:
1"(25mm)
- NOTE:

Bolt Circle Allowed:
11" to 13"
279mm to 330mm
Base & Bolts Information Anchor Plate Free opening
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 16 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City LCP version of LMS10760 & 7976 (10269)
Twin arm-pole.doc
12-06-2016 Page 3 / 5 640, Curé-Boivin
Boisbriand (Québec)
Canada, J7G 2A7
Description of Components:

Hardware: All exposed screws shall be stainless steel with Ceramic primer-seal basecoat to reduce seizing of the parts. All seals and sealing devices are made and/or lined with EPDM and/or silicone.

Finish: Color to be blue green textured (GN4TX) and in accordance with the AAMA 2603 standard. Application of a polyester power coat paint (4 mils/100 microns) with ± 1 mils/24 microns of tolerance. The Thermosetting resins provides a discoloration resistant finish in accordance with the ASTM D 2244 standard, as well as luster retention in keeping with the ASTM D 523 standard and humidity proof in accordance with the ASTM-D2247 standard.

The surface treatment achieves a minimum of 2000 hours for salt spray resistant finish in accordance with the tests performed and the ASTM-B117 standard.

LED products manufacturing standard: The electronic components sensitive to electrostatic discharge (ESD) such as light emitting diodes (LEDs) are assembled in compliance with IEC61340-5-1 and ANSI/ESD S20.20 standards so as to eliminate ESD events that could decrease the useful life of the product.

Quality Control: The manufacturer must provide a written confirmation of its ISO 9001-2008 and ISO 14001-2004 International Quality Standards Certification.

Mechanical resistance: In order to ensure the mechanical resistance of the poles, the reflected area should be calculated according to AASHTO standards and resists to a wind of 140 km/hr.

Web site information details: Click on any specific information details you need:

Paint finish / Warranties / ISO 9001-2008 Certification / ISO 14001-2004 Certification / cULus Certification / CSA Pole Certification
Miscellaneous
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 17 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E Emeryville City LCP version of LMS10760 & 7976 (10269)
Twin arm-pole.doc
12-06-2016 Page 4 / 5 640, Curé-Boivin
Boisbriand (Québec)
Canada, J7G 2A7
EXHIBIT D3: LUMEC LIGHT POLE DETAILS
SHEET 18 OF 18
DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E

C A L I F O R N I A
REV 08/2020 Page 1 of 5

E X H I B I T B
Contract Insurance Requirements
As used in this Exhibit B, Contractor refers to EURO STYLE MANAGEMENT.

1. MINIMUM REQUIREMENTS
Contractor shall, at its expense, procure and maintain for the duration of the Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work or Services required by the Contract hereunder by Contractor, its agents, representatives, employees or subcontractors. Contractor shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Contract. Such insurance shall meet at least the following minimum levels of coverage, as checked below:

1.1 Minimum Scope of Insurance
Coverage shall be at least as broad as the latest version of the following:
 General Liability
Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01).
 Automobile Liability
Insurance Services Office Business Auto Coverage form number CA 00 01, code 1 (any auto) or if Contractor owns no vehicles, this requirement may be met through a non-owned auto endorsement to the General Liability Policy.  Professional Liability / Errors and Omissions
Written on a policy form specifically designed to protect against acts, errors or omissions of the Contractor wherein “Covered Professional Services” as designated in the policy must specifically include Services performed under this Contract.
 Workers’ Compensation and Employer’s Liability
Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. Policies shall not contain exclusions contrary to this Contract.
 Pollution Liability Insurance
Pollution Liability insurance for claims arising from the discharge, dispersal release or escape or any irritant or contaminant into or upon land, any structure, the atmosphere, watercourse or body of water, including groundwater. This shall DocuSign Envelope ID: 7291A240-379B-4C68-979F-09CB09AF839E City of Emeryville | Contract Insurance Requirements (Exhibit B) REV 08/2020