RESOLUTION NO. 23-93
Resolution Of The City Council Of The City Of Emeryville Authorizing The City Manager To Execute A Second Amendment To The Professional Services Contract With Urban Planning Partners (UPP) Increasing The Total By $149,008 From $315,234 To $464,242 For Preparation Of A CEQA Compliant Environmental Document For The 5801 Christie Avenue Mixed Use Project Located At 5801 And 5681 Christie Avenue And Appropriating $49,008 In Expenditures To Division 1725, “Planning Reimbursables”, Account 80050, Professional Services WHEREAS, on September 20, 2022, the City Council of the City of Emeryville adopted Resolution No. 22-123, authorizing the City Manager to execute a Professional Services Contract with Urban Planning Partners (UPP) to prepare an environmental analysis under the California Environmental Quality Act (CEQA) that evaluates the potential impacts of the 5810 Christie Avenue Mixed Use Project (the “Project”) for an amount not to exceed $315,234; and
WHEREAS, on June 20, 2023, the City Manager executed a First Amendment to the Professional Services Contract with UPP to extend the completion time of delivery of services; and
WHEREAS, the City desires to have UPP provide additional services associated with the Project; and
WHEREAS, the City finds that specialized knowledge, skills, and training are necessary to render the services contemplated under this Second Amendment; and WHEREAS, the City has determined that UPP is qualified by training and experience to render such services; and
WHEREAS, UPP desires to provide such services and has submitted a proposal dated June 19, 2023 to provide this additional service for an additional fee not to exceed $149,008, for a new contract amount not to exceed $464,242; and WHEREAS, the public interest will be served by this Second Amendment; and WHEREAS, it is necessary to amend the fiscal year 2023-24 budget by appropriating $49,008 in expenditures to Division 1725, “Planning Reimbursables”, Account 80050, Professional Services, to cover the cost of this Second Amendment; now, therefore, be it RESOLVED, that the City Council of the City of Emeryville hereby authorizes the City Manager to execute a Second Amendment to the Professional Services Contract with Urban Planning Partners, Inc. in the form attached hereto as Exhibit A, for an additional amount not to exceed $149,008, for a total contract amount not to exceed $464,242 for additional services associated with the Project; and be it further RESOLVED, that the City Council of the City of Emeryville hereby amends the fiscal year 2023-24 budget by appropriating $49,008 in expenditures to Division 1725, “Planning DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 Resolution 23-93
Urban Planning Partners Second Amendment to Contract for 5801 Christie Avenue Mixed Use Project City Council Meeting | July 18, 2023

Page 2 of 2 ends

Reimbursables”, Account 80050, Professional Services.

ADOPTED, by the City Council of the City of Emeryville at a regular meeting held Tuesday, July 18, 2023, by the following vote:

AYES: 5
Mayor Bauters, Vice Mayor Welch and Council Members Kaur, Mourra and Priforce
NOES: 0
ABSTAIN: 0
ABSENT: 0
MAYOR
ATTEST: APPROVED AS TO FORM:

CITY CLERK CITY ATTORNEY
DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137

C A L I F O R N I A

P R O F E S S I O N A L S E R V I C E S C O N T R A C T

F O R C I T Y U S E O N L Y
Contract No. CIP No.

Resolution No. Project No.

REV 06/2020

SECOND AMENDMENT

THIS SECOND AMENDMENT TO THE PROFESSIONAL SERVICES CONTRACT (“Amendment”) is effective as of ____________________ (the “Effective Date”),, by and between THE CITY OF EMERYVILLE, a municipal corporation, (“City”) and URBAN PLANNING PARTNERS, INC. (“Contractor”), individually referred to as a “Party” and collectively as the “Parties”.

W I T N E S S E T H T H A T
WHEREAS, the City and Contractor entered into a Professional Services Contract dated October 27, 2022 (“Contract”) for the purpose of retaining the services of Contractor to provide UD22-1 5801 Christie Ave, Mixed-Use Project & EIR; and WHEREAS, the City and Contractor entered into a first amendment of the Contract on 6/20/23 for the purpose of extending the termination date of the contract, and WHEREAS, the City and Contractor desire to amend the Contract; and WHEREAS, the public interest will be served by this Amendment.

NOW, THEREFORE, the Parties hereto do mutually agree as follows:

1. AMENDMENT
The Parties agree to amend the Contract as checked below:

1.1 Exhibit A
 Exhibit A of the Contract is hereby amended in its entirety and replaced with Exhibit A-Revision Number;
OR
 Exhibit A of the Contract is hereby amended to include the provisions of Exhibit A-1, attached hereto and incorporated herein by this reference.

1.2 Termination Date
 The Parties desire to extend the termination date. Section 1.3 of the Contract is hereby amended to extend the termination date to NEW END DATE.

DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 "If: ~ City of Emeryville
- -
I I I
I I I
Exhibit A
DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 City of Emeryville | Professional Services Contract Amendment REV 06/2020

Page 2 of 3 ends

1.3 Total Compensation Amount
 The Parties desire to increase the Total Compensation Amount as set forth in Section 3.2 of the Contract by ONE HUNDRED AND FORTYNINE THOUSAND EIGHT DOLLARS AND NO CENTS ($149,008.00).

The total amount paid under the Contract as compensation for Services performed and reimbursement for costs incurred shall not, in any case, exceed FOUR HUNDRED AND SIXTY-FOUR THOUSAND, TWO

HUNDRED AND FORTY-TWO DOLLARS AND NO CENTS
($464,242.00).

2. CONTINUING EFFECT OF CONTRACT
Except as amended by this Amendment, all other provisions of the Contract remain in full force and effect and shall govern the actions of the Parties under this Amendment.

From and after the date of this Amendment, whenever the term “Contract” appears in the Contract, it shall mean the Contract as amended by this Amendment.

3. ADEQUATE CONSIDERATION
The Parties hereto irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment.

4. SEVERABILITY
If any portion of this Amendment is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

5. WAIVER
The City’s failure to enforce any provision of this Amendment or the waiver in a particular instance shall not be construed as a general waiver of any future breach or default.

SIGNATURES ON FOLLOWING PAGE
DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 City of Emeryville | Professional Services Contract Amendment REV 06/2020

Page 3 of 3 ends

6. SIGNATURE PAGE TO PROFESSESIONAL SERVICES CONTRACT

SECOND AMENDMENT
IN WITNESS WHEREOF the City and the Contractor have executed this Contract, which shall become effective as of the date first written above.

Approved As To Form:

City Attorney
Dated: CITY OF EMERYVILLE
City Manager
Dated: URBAN PLANNING PARTNERS, INC.
(Signature)

LYNETTE DIAS, PRINCIPAL
Attach:

W-9 Form
Attach:

Business License
Certificate
Attach:

Insurance Certificate
and Endorsements
DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 06/23/2023
DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 Memorandum
DATE June 19, 2023
TO Miroo Desai, Principal Planner
[email protected] FROM Carla Violet, Associate Principal [email protected] RE: UD22-1 5801 Christie Ave Mixed-Use Project Environmental Review Services Contract Modification #1
Urban Planning Partners (UPP) is requesting a contract modification to our current contract dated August 22, 2022. Approval of this modification will cover costs for incorporating the Emeryville Loop project into the 5801 Christie Ave Mixed-Use environmental analysis. The Emeryville Loop project would modify the roadway in the vicinity of the project through construction of new twoway Class IV separated bikeway facilities, one new midblock crossing, and dedicated transit lanes.

As a part of the active transportation and transit improvements, operations for vehicles in the loop would be converted to one-way.

ENVIRONMENTAL ANALYSIS
The associated fees for Fehr & Peers, UPP, and Baseline are summarized below for additional costs associated with analyzing the Emeryville Loop project. More detailed scopes and budget augments are included in Attachments 1 and 2.

FEHR & PEERS ($109,621)
• Fehr & Peers will collect new multimodal traffic counts that account for mode shift resulting from the Emeryville Loop improvements and update the Vissim microsimulation network to reflect the new existing conditions and project description. The requested amount reflects the replacement of Task 3a Operations Analysis (Intersection Operations) from their original scope of work and includes a 10% contingency ($9,966).

BASELINE ($17,565)
• Baseline will evaluate potential impacts associated with air quality, greenhouse gases, energy, noise and vibration, hydrology and water quality, geology, and hazardous materials.

EXHIBIT A-1 DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 URBAN

PLANN ING

PARTNERS
INC.
388 17TH STREET
SUITE 230
OAKLAND, CA 94612
510.251.8210
WWW.UP-PARTNERS.COM
DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 Miroo Desai, Principal Planner
June 19, 2023

Page 2 ends

URBAN PLANNING PARTNERS ($10,100)
• UPP will update the Project Description and figures as well as evaluate potential impacts associated with Land Use and Planning, Biological Resources, Parks and Recreation, and Public Services and Utilities.

FEE ESTIMATE
Urban Planning Partners requests a modification to increase the current not-to exceed fee by an additional $149,008, as shown in Table 1, to complete the additional scope of work.

Table 1: Requested Fee Increase
Consultant Fee
Fehr & Peers $109,621
Baseline Environmental Consulting $17,565
Urban Planning Partners $10,100
Urban Planning Partners (10% Subconsultant Mark-up) $11,722 Total $149,008
Original Contract Date: August 22, 2022
Original Contract Amount: $315,234
Contract Mod #1: $149,008
Contract Amount with Contract Mod #1: $464,242

AUTHORIZATION
Please sign below and return to UPP if the terms of this contract modification are agreeable. All terms of our original contract would remain in effect. Feel free to contact Carla at (510) 251-8210 with any questions. We look forward to completing this project for the City of Emeryville.

Sincerely,
URBAN PLANNING PARTNERS, INC.

Carla Violet

ASSOCIATE PRINCIPAL/PLANNING MANAGER
O: 510.251.8210 x1005
Attachment 1: Fehr & Peers Budget Amendment
Attachment 2: Baseline Budget Amendment
DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 C DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 Miroo Desai, Principal Planner
June 19, 2023

Page 3 ends

CONTRACT MODIFICATION #1
TO $464,242 TOTAL CONTRACT AMOUNT
ACCEPTED AND AUTHORIZED BY:
__________________________________________ ___________________________ Miroo Desai Date
City of Emeryville
6/20/23
DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 -{-DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 2201 Broadway, Suite 602 | Oakland, CA 94612 | (510) 834-3200 www.fehrandpeers.com
April 27, 2023
Shauna Wright
Urban Planning Partners
388 17th Street, Suite 230
Oakland, CA 94612
Subject: 5801 Christie Avenue Transportation Operations Assessment Amendment Dear Shauna,
Thank you for inviting Fehr & Peers to perform additional analysis for the 5801 Christie Avenue project in the City of Emeryville. We understand that the City would like to include the Emeryville Loop project identified in its draft Active Transportation Plan update as part of the 5801 Christie Avenue project. The Emeryville Loop project would modify the roadway in the vicinity of the project through construction of new two-way Class IV separated bikeway facilities, one new midblock crossing, and dedicated transit lanes.

As a part of the active transportation and transit improvements, operations for vehicles in the loop would be converted to one-way. Shellmound Street would become one-way northbound between Christie Avenue and Shellmound Way, Shellmound Way would become one-way westbound, and Christie Avenue would become one-way southbound between Shellmound Way and Shellmound Street. The dedicated transit lane within the loop would connect to new transit only-lanes on Powell Street and at the Interstate 80 interchange.

Original scoping of operational analysis for the 5801 Christie Avenue project in 2022 assumed the use of multimodal traffic counts and Vissim microsimulation networks developed in 2019 as part of the Onni Christie Mixed-Use project. However, the inclusion of the major infrastructure improvements represented by the Emeryville Loop and stabilization of a “new normal” in traffic patterns following the Covid-19 pandemic necessitates the collection of new multimodal traffic counts to represent existing conditions, intersection volume forecasts that account for mode shift resulting from the Emeryville Loop improvements, and updates to the microsimulation networks to reflect the new existing conditions and project definition.

The following scope of work has been prepared based on conversations with City of Emeryville staff and builds upon the scope of work contained within our contract dated December 15, 2022.

SCOPE OF WORK
We will complete the following tasks as part of this scope of work.

DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 FEHRf PEERS
DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 Shauna Wright
April 27, 2023

Page 2 of 4 ends

Task 1 – Data Collection
Fehr & Peers will obtain weekday morning (7:00 AM to 9:00 PM), weekday evening (4:00 PM to 6:00 PM), and Saturday afternoon (2:00 PM to 4:00 PM) peak period intersection turning movement counts, including a separate count of vehicles, pedestrians, bicycles, and trucks, at the 22 study intersections identified in the 5801 Christie – Transportation Analysis Assumptions (February 23, 2023) memorandum, as well as the Shellmound Street/Ohlone Way intersection. Additionally, we will conduct field observations during the peak periods for the purposes of validating the microsimulation model, including lane utilization, vehicle queue spillback, and saturation flow rates.

Task 2 – Trip Generation and Distribution
Fehr & Peers will estimate the net new automobile trip generation for the project for the Saturday peak hour consistent with the trip generation approach presented in the 5801 Christie – Transportation Analysis Assumptions (February 23, 2023) memorandum, as well as trip estimates for walking, bicycling, and transit.

In addition, separate multimodal trip generation estimates for the project that consider the effect of the Emeryville Loop and other planned multimodal improvements in the vicinity on project mode share will be developed for the daily, AM, PM, and Saturday peak periods.

Vehicle trip distribution and assignment for the Saturday peak period will be estimated based on the relative location of complementary land uses, existing traffic patterns in the vicinity of the site, area traffic congestion, and the relative locations of freeway on- and off-ramps.

Task 3 – Intersection Volume Forecasts
Development of multimodal turning movement volume forecasts during the AM and PM peak hours at the study intersections was included in the original scope for the following scenarios:
• Existing Conditions – Based on traffic data collected for Onni Christie Mixed-Use project • Existing Plus Project Conditions (No Loop) – Existing Conditions plus traffic expected to be generated by the project
• Near-Term Conditions – Existing Conditions plus traffic generated by other pending projects expected to be developed in the next 5 to 10 years and changes to traffic patterns and intersection signalization resulting from implementation of the Emeryville Quiet Zone Study • Near-Term Plus Project Conditions (No Loop) – Near-Term Conditions plus traffic expected to be generated by the project
For this amended scope of work, Fehr & Peers will update Existing Conditions to reflect data collected in Task 1, develop Saturday peak hour multimodal volume forecasts for the above four scenarios, and develop AM, PM, and Saturday peak hour forecasts for the following scenarios:

DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 FEHR-1' PEERS
DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 Shauna Wright
April 27, 2023

Page 3 of 4 ends

• Existing Plus Project Conditions (With Loop) - Existing Conditions plus traffic expected to be generated by the project and changes to automobile, bicycle, and pedestrian traffic patterns resulting from implementation of the Emeryville Loop
• Near-Term Plus Project Conditions (With Loop) – Near-Term Conditions plus traffic expected to be generated by the project and changes to automobile, bicycle, and pedestrian traffic patterns resulting from implementation of the Emeryville Loop
Assumptions for potential mode shifts that could be expected from construction of the loop will be discussed with City staff and based on a variety of data inputs, including the regional travel model, national research, and existing multi-modal counts. The resulting forecasts for all modes will consider the potential for some people who currently drive through the area to shift to transit, walk or bike modes, and for the potential of latent walking and biking demand as the loop project would provide a regional benefit and help to better connect people to the Bay Bridge Bike Trail and other destinations.

Task 4 – Operations Analysis
Fehr & Peers will evaluate intersection operations, including level of service (LOS) and vehicle queues, for the study intersections during the AM, PM, and Saturday peak hours under the scenarios described in Task 3 using a Vissim microsimulation network to analyze intersection operations of the 20 study intersections included in the Vissim network developed for the Onni Christie project in addition to the Shellmound Street/Ohlone Way intersection and the Synchro software to apply Highway Capacity Manual Sixth Edition methodologies for the other two study intersections. The analysis results can be used to help inform design features of the Loop, including potential signal operations for transit vehicles and bikes, as well as storage requirements for all travel modes. The analysis results and recommendations will be included in a memorandum summarizing all non-CEQA analysis conducted for the project.

LEVEL OF EFFORT AND SCHEDULE
With the inclusion of new data collection, incorporation of a Saturday analysis, and addition of the Loop Scenarios, a budget amendment of $99,655 is requested, which reflects replacement of Task 3a from the original scope of work. This would bring our total fee to $202,055, and increase our contingency to $25,256, including the $5,050 EIR contingency. The contingency would only be used upon receiving authorization from City staff for tasks outside this scope of work.

DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 FEHR-1' PEERS
DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 Shauna Wright
April 27, 2023

Page 4 of 4 ends

We can submit the non-CEQA memorandum that includes a summary of the analysis performed in this scope within 16 weeks of collecting multimodal traffic count data.

Please contact Jordan ([email protected] or 510-587-9429) with questions or if you need any additional information. We look forward to continuing working with you on this project.

Sincerely,

FEHR & PEERS
Kathrin Tellez, AICP, PTP, RSP1
Principal
P22-1161-OK
Jordan Brooks, AICP
Senior Transportation Planner
DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 FEHR-1' PEERS
Budget Estimate for 5801 Christie Additional Operations Analysis Other
Principal-in- Project Senior Planner/ Direct Task
Charge Manager Engineer Engineer Graphics Admin Staff Hours Expenses Budget Fehr & Peers Tasks/Billing Rate $300 $200 $200 $ 160 $ 160 $150 1 Data Collection 16 30 $11,685 $16,995
2 Trip Generation and Distribution (Saturday and Loop) $100 $1,590 3 Intersection Volume Forecasts (Saturday and Loop) 6 20 32 $300 $5,900 4 Operations Analysis (EX) 8 48 80 18 164 $1,500 $30,640 Operations Analysis (EXPP, no loop) 4 8 40 63 $500 $11,270 Operations Analysis (EXPP, loop) 6 12 40 72 $600 $13,320 Operations Analysis (NT) 16 48 81 $700 $14,650
Operations Analysis (NTPP, no loop) 40 63 $500 $11 ,270 Operations Analysis (NTPP, loop) 6 12 40 72 $600 $13,320 Total 24 42 112 328 14 65 585 $16,485 $ 118,955
Original Task 3a - Operations Analysis (Intersection Operations) -$19,300 Net Additional Fee $99,655
Contingency - 10% $9,966
Total Inc luding Contingencies $109,621
DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 1 Scope of Work Modification for 5801 Christie Avenue Project Emeryville, California
Prepared for Urban Planning Partners – 6 June 2023
Project Understanding
Baseline Environmental Consulting (Baseline) has prepared the scope of work modification below based on the addition of the Christie-Shellmound Loop (the Loop) to the 5801 Christie Avenue Project in Emeryville, California (project). Baseline will assist Urban Planning Partners (UPP) in the preparation of an Initial Study/15183 Exemption for the proposed project. We understand that the proposed project would include the construction of a multi-story research and development building, a multi-story parking garage, and multi-story residential buildings, and the Loop which would include intersection upgrades and bike, pedestrian, and transit improvements.

Baseline will evaluate potential impacts associated with air quality, greenhouse gases, energy, noise and vibration, hydrology and water quality, geology, and hazardous materials. Baseline assisted in preparation of the 2019 EIR for the previous project proposed at this location by the Onni Group. It is Baseline’s intention to rely on the setting and impact analyses included in those draft EIR sections to the extent feasible, modifying and updating them, as needed, to be applicable and appropriate for the new project proposal. Baseline assumes there would be up to two rounds of administrative review and up to two phone calls with UPP, the City, and/or the applicant.

Air Quality
Baseline will prepare an Initial Study section to evaluate potential impacts related to air quality.

Based on the preliminary review of the project, the primary air quality concerns will be related to the net increase in emissions of criteria air pollutants and the exposure of existing nearby receptors (e.g., residences) to toxic air contaminants (TACs) during project construction and operation. The project would emit diesel particulate matter (DPM), a type of TAC, from dieselpowered construction equipment and operation of emergency diesel generators during operation.

Potential air quality impacts will be assessed in accordance with the Bay Area Air Quality Management District’s (BAAQMD’s) CEQA Air Quality Guidelines. Because the proposed project exceeds the BAAQMDS’s screening criteria, the net emissions of criteria air pollutants during project construction and operation will be estimated using the most current version of the California Emissions Estimator Model (CalEEMod). It is assumed that the project applicant will provide a detailed construction equipment list for the Loop improvements, including the type, DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 2 22225-00 UPP Christie Ave Scope mod.docx
quantity, and duration of construction equipment use.

Health risks associated with DPM emissions during project construction and operation will be discussed qualitatively based on the assumption that the project will implement conditions of approval that require the use of best available technology to reduce health risks to the maximum extent feasible and comply with the City’s Genal Plan policies to reduce air quality impacts to a less-than-significant level.

Greenhouse Gas Emissions
Baseline will prepare an Initial Study section to evaluate potential impacts related to greenhouse gas (GHG) emissions. In accordance with BAAQMD’s CEQA Air Quality Guidelines, Baseline will analyze the project’s consistency with the California Air Resources Board’s 2022 Scoping Plan and the City’s Climate Action Plan. The project design will also be compared to the BAAQMD’s thresholds of significance, which includes the exclusion of natural gas appliances and plumbing, reductions in project-generated vehicle miles travelled below the regional average, and electric vehicle charging infrastructure. Conditions of approval will be identified (if any) to reduce any potentially significant impacts to less-than-significant levels. It is assumed that a detailed traffic analysis that evaluates the project’s vehicle miles travelled relative to the regional average will be provided to Baseline. It is also assumed that a written description of any proposed energy-saving features that are proposed to be included in the project design will be provided to Baseline.

Energy
Baseline will prepare an Initial Study section to evaluate potential impacts related to energy resources. Baseline will summarize the project’s proposed energy-saving features, projected energy consumption, consistency with applicable energy efficiency policies and standards, and the potential need for new energy supplies or facilities to serve the project. It is assumed that the applicant will provide written descriptions of any proposed energy-saving features.

Noise and Vibration
Baseline will prepare an Initial Study section to evaluate potential impacts related to noise and vibration. Noise and vibration generated during project construction could expose nearby sensitive receptors to levels that exceed the standards specified in the City of Emeryville General Plan and Municipal Code. Noise impacts could also occur during operation of the proposed project because of the potential increase in vehicular traffic and stationary equipment.

The primary sources of existing ambient noise levels in the project vicinity are from I-80 and Union Pacific Railroad and Amtrak train activity. Baseline will provide a quantitative analysis of the noise levels that would be generated by the project’s off-road construction equipment.

Noise and vibration levels from other sources (e.g., vehicles and HVAC units) will be discussed qualitatively and Baseline will identify conditions of approval to comply with the City’s General DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 3 22225-00 UPP Christie Ave Scope mod.docx
Plan policies to reduce noise and vibration impacts to a less-than-significant level.

Hydrology and Water Quality
Baseline will prepare an Initial Study section to evaluate potential impacts related to hydrology and water quality. According to the Federal Emergency Management Agency, the project site is not located in a flood hazard zone. Construction of the proposed project (including the Loop) would disturb potentially contaminated soils, resulting in the potential for erosion and mobilization of contaminated sediments in stormwater runoff. Dewatering of excavations may be required during construction. If not properly managed, discharge of contaminated dewatering effluent could adversely affect receiving water quality. Creation of new impervious surfaces could alter drainage patterns and increase the rate and volume of stormwater runoff from the project site to existing stormwater drainage systems. Baseline will analyze potential impacts related to hydrology and water quality that may result under development of the proposed project.

Construction activities would be required to comply with the State Water Board’s Construction General Permit for stormwater discharges. The proposed project would also be required to comply with the Municipal Regional Stormwater National Pollutant Discharge Elimination System (NPDES) Permit, which includes the incorporation of post-construction stormwater management measures to manage and treat stormwater prior to discharge. Baseline will describe the construction-period and post-construction stormwater controls that are applicable to the proposed project. Conditions of approval will be identified, as needed, to reduce any potentially significant impacts to less-than-significant levels, if feasible.

Geology and Soils
Baseline will prepare an Initial Study section to evaluate potential impacts related to geology, soils, and paleontological resources. The analysis will include an overview of the environmental setting and regulatory framework. The project site is located in a seismically active region.

Although the project site is not mapped within an Alquist-Priolo Fault Zone by the California Geologic Survey, a significant earthquake on one of the regional faults near the project site will likely produce strong ground shaking during the life of the project. The project site would not be subject to landslides or substantial soil erosion because the site and surrounding areas are generally flat. The project site is mapped in a liquefaction hazard area by the California Geologic Survey.

Construction of the Loop would occur in areas with different geologic conditions from the 5801 Christie Avenue site, therefore Baseline will need to describe additional geologic setting information, and potential impacts related to geologic conditions and paleontological resources could vary between the Loop and 5801 Christie Avenue site. It is assumed that a new geotechnical report (specific to the new proposed project) will be completed by the applicant and made available to Baseline for review. Based on review of the geotechnical study and other available reports and maps, Baseline will evaluate potential impacts related to geology, soils, DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 4 22225-00 UPP Christie Ave Scope mod.docx
and paleontological resources. Conditions of approval will be identified, as needed, to reduce any potentially significant impacts to less-than-significant levels.

Hazardous Materials
Baseline will prepare an Initial Study section to evaluate potential impacts related to hazards and hazardous materials. The project site (including the Loop) is located in a historically industrial area where the shallow subsurface consists of potentially contaminated fill that was historically placed in the San Francisco Bay. Previous soil and groundwater investigations conducted on the 5801 Christie Avenue site in 2005 and 2015 detected petroleum hydrocarbons and heavy metals in the soil and groundwater. In addition to the soil and groundwater impacts, methane has been documented in the soil gas in the Emeryville area.

Baseline will review and summarize the findings of previous environmental investigations performed at the project site. Baseline will also identify potential concerns associated with demolition of the existing buildings (e.g., lead paint, asbestos, and polychlorinated biphenyls) and the routine transport and use of hazardous materials during construction and operation.

Conditions of approval will be identified, as needed, to reduce any potentially significant impacts to less-than-significant levels.

We understand that additional environmental investigation and remediation of the 5801 Christie Avenue site would be performed under the oversight of the Department of Toxic Substances Control. Our scope and budget assumes that any environmental investigation related documents (e.g., investigation workplans or reports) for the project site that would be discussed in the Initial Study would be made available to Baseline prior to performing the Initial Study analysis. If additional environmental investigation related documents are provided to Baseline after preparation of the Initial Study has commenced, then revisions to the Initial Study would be required, and a budget modification may be required to address such revisions.

Our scope of work and budget assumes that a Remedial Action Workplan (RAW) or similar remediation plans for the project site would not be available prior to preparation of the Initial Study, and therefore the Initial Study would not include the review of a RAW or similar remediation related documents. It is also assumed that a new Phase I Environmental Site Assessment (specific to the Loop) will be completed by the applicant and made available to Baseline for review.

DocuSign Envelope ID: 47226473-7107-4095-9471-C8871F5BE7A4 DocuSign Envelope ID: 0B76E2D1-4829-4E2C-A765-8889DC7B2137 Total
Augment
Hourly rate
Task hrs cost hrs cost hrs cost costScope Augment for Initial Study/15183 ExemptionAir Quality 1 $225 12 $2,100 $2,325Greenhouse Gas Emissions 1 $225 6 $1,050 $1,275 Energy 1 $225 6 $1,050 $1,275Noise 1 $225 12 $2,100 $2,325Hydrology 1 $225 10 $1,900 $2,125 Hazards 1 $225 16 $3,040 $3,265Geology 1 $225 8 $1,520 $1,745Meetings* 1 $225 1 $190 1 $175 $590 Reponse to Admin. Comments** 2 $450 6 $1,140 6 $1,050 $2,640 Total Augment $17,565
Original Budget $29,265
TOTAL MODIFIED BUDGET $46,830
Notes:* Assumes up to 2 phone calls with UPP, City, and/or applicant. ** Assumes up to 2 rounds of review.

Senior Environmental
Engineer
Baseline Environmental Consulting
Budget Modification Cost Estimate for 5801 Christie Avenue, Emeryville Prepared for UPP – 6 June 2023
$225
Cem Atabek
$190
Patrick Sutton
Principal Environmental
Engineer
Yilin Tian
Environmental
Engineer
$175
22225‐00 UPP Christie Ave buget mod Page 1 of 1