Emeryville 2023 General Plan Annual Report Page 1
City of Emeryville
2023 General Plan Annual Progress Report
Accepted by City Council on March 19, 2024
Table of Contents
Introduction 1
General Plan Amendment 3
Development Decisions 3
General Plan Implementation 4
Housing Element Implementation 7
Housing Successor Annual Report 13
Introduction
Purpose of the Annual Progress Report
Sections 65400 and 65700 of the California Government Code require all cities and counties to file an annual report addressing the status of the General Plan and reporting on the progress made towards implementing its goals and policies to their legislative bodies. The progress report must be submitted to the Governor’s Office of Planning and Research (OPR) and the Department of Housing and Community Development (HCD) by April 1 of each year. The annual progress report provides a means to monitor the success of implementing the General Plan and determine if changes are needed in the plan or its implementation programs. This report follows the Annual Progress Report Memo for Reporting Year 2022, which was not updated by the State for 2023. Major planning activities are described, along with other City actions, in the section on implementation of General Plan Elements.

Purpose of the General Plan
The General Plan is mandated by California Government Code Section 65300, which requires each city and county to adopt a plan that outlines a vision for the physical development of the City. The Emeryville General Plan establishes a vision for the City’s long-term growth and enhancement and provides strategies and action items to achieve this vision.

The plan also establishes a baseline by which to determine whether development proposals and public projects are consistent with the City’s goals for the future. The plan also conveys these goals to City staff, partner agencies, developers, and the public at large, and ensures that all entities adhere to common objectives.

Emeryville 2023 General Plan Annual Report Page 2
Status of the Adopted Elements of the General Plan
State law requires that all general plans include seven elements which must cover the following topics: Land Use, Circulation, Housing, Safety, Noise, Conservation, and Open Space. Elements for other topics of local concern may also be included. The Emeryville General Plan includes two optional elements: Urban Design and Sustainability. Except for the Housing Element, all elements of the Emeryville General Plan were adopted as a single document on October 13, 2009. State requirements for housing elements are more detailed and specific than for the other general plan elements, and housing elements are updated every eight years according to a schedule set by the State.

The Emeryville Housing Element is contained in a separate document which was adopted by the City Council on December 12, 2022 and certified by HCD on February 3, 2023. The Housing Element covers the eight-year period from 2023 to 2031. This is the first year reporting the new 2023-2031 (6th Cycle) Housing Element.

This report describes implementation of the current 2023-2031 Housing Element and includes building permits issued from January 1, 2023 through December 31, 2023.

The correspondence between State mandated elements and the Emeryville General Plan is illustrated in the table below.

Correspondence between Required General Plan Elements and Emeryville General Plan Required Element Emeryville General Plan
Land Use Chapter 2: Land Use
Circulation Chapter 3: Transportation
Conservation Chapter 6: Conservation, Safety and Noise
Open Space Chapter 6: Conservation, Safety and Noise, and Chapter 4: Parks, Open space, and Public Facilities
Safety Chapter 6: Conservation, Safety and Noise
Noise Chapter 6: Conservation, Safety and Noise
Urban Design (optional) Chapter 5: Urban Design
Sustainability (optional) Chapter 7: Sustainability and Chapters 2-6 Housing Separate Document
Compliance with State Office of Planning and Research Guidelines Emeryville’s General Plan was updated in 2009 according to the State Office of Planning and Research’s Guidelines and amended most recently in 2023 to maintain consistency with the Active Transportation Plan adopted in 2023.

Senate Bill (SB) 1000, adopted in 2016, requires local governments with disadvantaged communities in their planning areas to develop environmental justice policies as part of their general plans. The disadvantaged communities in Emeryville are in the East Baybridge, San Pablo Corridor and Triangle neighborhoods. Government Code section 65302(h), states that, Emeryville 2023 General Plan Annual Report Page 3
after 2018, cities with disadvantaged communities are required to include an environmental justice element when two or more elements are amended. The City of Emeryville has not amended two or more elements since 2018 and does not anticipate doing so.

Housing Successor Annual Report
Housing successors (entities that assumed the housing assets and functions of former redevelopment agencies) must report annually on their housing activities. That report is included in this report as Appendix C.

Changes Needed to the General Plan
No goals, policies, objectives, standards or other plan proposals need to be added, deleted, amended, or otherwise adjusted.

General Plan Amendment
In 2023 the General Plan was amended to update maps in the Transportation Element to reflect the Active Transportation Plan (ATP) adopted on October 17, 2023.

Development Decisions
Large development projects approved in 2023 include:
- The Bay Center Life Science Project was approved by the Planning Commission on August 24, 2023. This required a Conditional Use Permit and Design Review permit for a new six story, 96-foot-tall building accommodating 210,000 square feet of Research and Development space and a new 595-space parking garage at 6425-6455 Christie Avenue.

The Research and Development building includes approximately 2,200 square feet of Community Assembly Space.
- The Planning Commission approved a request for a two-year extension of a Conditional Use Permit and Design Review permit that was approved by the Planning Commission on December 9, 2021, for a new 24-unit residential building consisting of all 2- and 3- bedroom units at 1225 65th Street.

Smaller development projects with entitlements approved by the Planning Division or with finalized Building Permits (temporary or completed Certificates of Occupancy) in 2023 include:
- The preliminary development plan and conditions of approval for The Promenade Center Retail/Mixed Use Project were amended to include “Commercial Recreation - Indoor Sports And Recreation” as a permitted use and language restricting hours of operation were removed to facilitate a proposed Planet Fitness gym to operate 24 hours per day, seven days per week.
- A temporary women’s shelter was approved on March 23, 2023 for the period of one year.
- 22 ADUs were entitled and four ADUs received certificates of occupancy.

Updated status of projects in 2023 that were shown in the development “pipeline” in 2022 include:

Emeryville 2023 General Plan Annual Report Page 4
- An application was withdrawn for a Life Sciences Tower at 5850 Shellmound for which three study sessions were held in 2022.
- The building permit for the demolition of one residential unit and replacement of the structure with three new residential units at 1270 Ocean Avenue expired. A new planning application would need to be submitted and approvals obtained to move forward with this project.
- Building permits were issued on May 9, 2023, for the 90-unit Nellie Hannon Gateway affordable housing project at 3600 San Pablo Avenue.

The development projects described above, and their approval steps, are shown in the attached Development Decisions and Pending Projects table.

In addition, Planning Division staff issued 51 administrative Planning approvals in 2023, and the Building Division issued a total of 664 building permits of various types (including plumbing, electrical, mechanical, and fire).

General Plan Implementation
Chapter 8 of the Emeryville General Plan contains an implementation program to achieve the goals of every action item within each element (except the Housing Element, which contains its own implementation program and is addressed below). The General Plan also describes the processes for implementing each action item, and identifies the agencies involved. Appendix A, General Plan Annual Progress Report Implementation, tracks progress made on those 79 actions during the 2023 calendar year.

Of the 79 actions, the City made progress on 54 in 2023 (see the attached City of Emeryville 2023 General Plan Annual Implementation Report).

No progress was made on seven actions in 2023:
• PP-A-4 (coordinating greenway creek improvements and water features with community) • PP-A-11 (locating a new Police Administration facility), • PP-A-8 (work on uses for sites no longer needed by other public agencies), • PP-A-12 (continue to operate the Community Emergency Response Team (CERT) Program),
• UD-A-10 (developing new sign regulations),
• CSN-A-5 (studying a trail at the Emeryville Crescent), and • ST-A-7 (identifying new farmers’ markets sites).

The following 18 were completed before or during 2023:
• CSN-A-6 (identify historic and cultural resources; refine significant structures ordinance),
• CSN-A-15 (update Capital Improvement Program)
• CSN-A-17 (establish conditions of approval for mechanical equipment with potential noise impacts),
• CSN-A-18 (require noise study for projects with high noise exposure), • ST-A-2 (adopt the United Nations Environmental Accords, implement 14 actions) Emeryville 2023 General Plan Annual Report Page 5
• ST-A-3 (incorporate Build It Green or LEED and Bay Friendly standards in construction projects),
• ST-A-4 (follow green building and Bay Friendly Landscaping requirements in City projects),
• ST-A-5 (require public-private projects to follow green building and Bay Friendly Landscaping requirements),
• T-A-1 (prepare Quality of Service standards for all transportation modes), • T-A-12 (urge buses to carry bicycles),
• T-A-17 (require all new development to contribute to the Emeryville Transportation Management Association),
• PP-A-1 (prepare a strategic parks master plan),
• PP-A-5 (update and implement five-year Capital Improvement Program) • PP-A-14 (require development projects to upgrade sanitary sewer systems), • LU-A-4 (prepare and update Design Guidelines)
• LU-A-5 (update Capital Improvements Program)
• UD-A-1 (prepare Design Guidelines), and
• UD-A-5 (update Capital Improvements Program).

Of these 18 items, four are related to the update of the Capital Improvements Program (CIP) but depending on the general plan element associated with the action (LU for Land Use; CSN for Conservation, Safety and Noise), the implementing action has a different focus (see the attached City of Emeryville 2023 General Plan Annual Implementation Report).

Notably, while some items were listed as complete last year, such as CSN-A-15 (Update the Local Hazard Mitigation Plan (LHMP)), this item is listed as incomplete for 2023 because a new planning cycle has begun for the next 5-year LHMP period.

Many items that are listed as complete, such as UD-A-1 (prepare Design Guidelines) continue to be updated, in this case, because the Design Guidelines were amended in 2023.

General Plan Implementation: Element Highlights
The following sections contain some of the highlights from each element of the General Plan Land Use
• The Planning Regulations were updated to incorporate objective standards, funded by an SB 2 Planning Grant from the State Department of Housing and Community Development.
• The City is processing its third project under SB 35, which mandates ministerial approval (i.e. staff level), and AB 1763, which specifies no density limit for projects within onehalf mile of transit. The Christie Avenue Affordable Housing Project is a 100% affordable project with 362 rental units in three separate buildings that also adds 6,000 square feet to Christie Park with an active multi-use court. • In 2023 the Design Guidelines were updated along with the Planning Regulations to address objective standards. All objective standards are now located in the Planning Regulations, and all subjective items are incorporated into the Design Guidelines.

Emeryville 2023 General Plan Annual Report Page 6
Transportation
• Groundbreaking on the quiet zone project for crossing improvements for 65th and 67th Streets, including bike/ped improvements, gates and signals and the closure of 66th Street all took place in 2022. Construction continued in 2023 and is anticipated to be complete in 2024.
• The Pedestrian and Bicycle Plan, adopted in 2012, was replaced with the Active Transportation Plan (ATP) which was adopted in 2023.The ATP includes a pedestrian network, project priorities, programs that address safety, and is included in the CIP. • In 2023 Emeryville staff continued to attend Caltrans project meetings on a redesigned Ashby interchange including a pedestrian-bicycle bridge over the freeway with a park/overlook to the Bay.

Parks, Public Facilities and Services
• In 2023 the Davenport Park rehabilitation project grand opening was held on March 3 and the grand opening for Huchiun Park occurred on October 28. • Amendments to the Planning Regulations in 2023 included revisions for the implementation of Objective Standards: the objective standards update clarified how to implement General Plan goals related to parks through zoning. • Community Events in 2023 included a Harvest Festival in October, and Holiday Tree Lighting in December. As of December 2023, 56 children (maximum capacity) were enrolled in the Emeryville Child Development Center. Youth programs included the After School Expanded Learning Program, Before School Care, Kinder Buddies, Summer Camps, and Youth Basketball and Soccer. Adult programs include sports and fitness classes. The Senior Center has various services including, fitness, wellness, computer training, Meals on Wheels and congregate lunch. There is also an aquatics center that hosts a variety of swim programs for all ages. Programs are promoted through the News and Activity Guide, the City website, Facebook, X, E-news, and Notify Me. In 2023, the free afterschool program that began in 2022 and is funded by an EUSD grant for all Anna Yates students continued. In 2022 this program increased enrollment by over 100% and in 2023 enrollment continues to exceed expectations.

Urban Design
• As part of the Objective Standards revisions to the Planning Regulations that were adopted in 2023, references to area plans were revised and regulations were updated to provide clarity and help simplify implementation of area plans. • In 2022 the Active Transportation Plan contract was amended to include a citywide wayfinding program that will include signage, public art, and gateway locations. In 2023 the wayfinding program was adopted by City Council and included in the CIP. • In 2023 the Sherwin Williams project developer, Quarterra, in compliance with the City’s Art in Public Places Ordinance, installed $1 million of public art including a piece in the newly opened Huchiun Park and two sculptures on the expanded Emeryville Greenway and a new mural and building railing south of the South Bayfront bridge.

Emeryville 2023 General Plan Annual Report Page 7
Conservation, Safety and Noise
• In 2020 an application was received and approved for renovations to the existing Pelco Building at 1550 Park Avenue. In addition to a change in use, the project would reuse a building listed as a Significant Structure in the Planning Regulations, add sidewalks, street trees, and lighting where there were none, and include a public art installation along the railing fronting the new sidewalk. In 2022 a temporary certificate of occupancy (TCO) was issued to allow occupancy of the building while final touches on the project were finished, the project was completed in February 2023. • In 2023 the Emergency Operations Center (EOC) received replacements and upgrades to multi-function printing devices. On July 21, 2023, the City received $1,497,500 for additional EOC upgrades from BioMed Realty in fulfillment of a condition of approval for their Emery Yards project, and these funds were incorporated into the City’s updated CIP.
• Planning for the 2025 update to the LHMP began in 2023, including an online survey that was conducted to help inform the mitigation planning process.

Sustainability
• In 2016 staff brokered green purchasing arrangements with several vendors which were renewed and strengthened in 2023, with an additional focus on foodware. • In 2023 the City continued to work on many elements of the Climate Action Plan, especially active transportation, with new bike/ped facilities planned or installed, and in electrifying transportation and new buildings. Implementation of SB 1383, the short-lived climate pollutant reduction law, took place in 2023 and is consistent with Climate Action Plan goals and policies.
• Bay Friendly Basics and the Bay-Friendly Landscape Scorecard are part of the City's Water Efficient Landscaping code, and apply to all development projects. Standard conditions of approval require scorecards from Stopwaste.org building guidelines, Build it Green, or LEED.

Housing Element Implementation
Appendix B, the Housing Element Annual Progress Report, tabulates housing production and progress in implementing Housing Element programs. Following are highlights of the 2023 Housing Element Annual Progress Report:

Housing Development Applications Submitted (Table A)
In 2023, Planning applications were received for fourteen development projects that would provide 383 new housing units through the development of thirteen Accessory Dwelling Units (ADUs) on eight different sites, 362 units at 5890, 5900 and 6150 Christie Avenue, two units at 3690 Adeline Street, two units at 6000 and 6040 Hollis Street, two units at 1047 43rd Street, one unit at 4107 Adeline Street, and one unit at 5519 Beaudry Street. Twelve units were approved, and no units were disapproved. Six project applications were still in process at the end of 2023.

The approved projects include 12 above moderate-income housing units.

Entitlements, Building Permits, and Occupancy (Table A2) Emeryville 2023 General Plan Annual Report Page 8
In 2023, planning approval was granted for thirteen projects that would provide 27 new housing units, including 22 Accessory Dwelling Units on ten different sites, an additional unit at 4107 Adeline Street, two additional units at 6000-6040 Hollis Street and two additional units at 3960 Adeline Street. The approved projects include twenty-seven above moderate-income housing units. The City issued fifteen building permits to build 118 units. 90 of those units are part of the Nellie Hannon Gateway development and 28 of the units are Accessory Dwelling Units. The permitted projects include 53 very low-income units, 36 low-income units, and 29 above moderate-income housing units. Certificates of occupancy were issued for eight projects providing 499 units. 186 units at Bayview Apartments, 306 units within two phases at The Emery project (aka Sherwin Williams Redevelopment Project), two additional units at The Bridge (aka Bridgecourt Apartments), four Accessory Dwelling Units, and an additional unit at 5534 Beaudry Street. The completed projects include 18 very low-income units, 18 low-income units, 24 moderate income units and 439 above moderate-income housing units. One of the Housing Element programs is to update the housing sites inventory; that update is attached and is discussed below.

Regional Housing Needs Allocation Progress (Table B)
The implementation period for the Regional Housing Needs Allocation (RHNA) is from June 30, 2022, to January 30, 2031. Since June 30, 2022, 138 dwelling units have received building permits – 8% of the RHNA (1,815 units). Of these, 53 (12% of goal) are very low-income units, 36 (24% of goal) are low-income units, and 49 (6% of goal) are above moderate-income units.

Additionally, the City has made significant progress towards its extremely low-income goal by issuing 45 permits (20% of goal). This information is summarized in the chart below titled “2023 RHNA Performance.”
Table 1: 2023 RHNA Performance
Income
Level
RHNA
Allocation
Building Permits Issued
Need
Remaining by
Income
% Goal
Met
July 22 –
Jan 23
Feb 23 –
Dec 23
Grand
Total
Very Low 451 0 53 53 398 12%
Low 259 0 36 36 223 14%
Moderate 308 0 0 0 308 0%
Above 797 23 26 49 748 6%
Total 1,815 23 115 138 1,677 8%
Extremely Low 226 0 45 45 181 20%
Sites Identified or Rezoned to Accommodate Shortfall Housing Need (Table C) Emeryville did not have a shortfall of housing sites, so the City did not need to identify or rezone additional sites.

Emeryville 2023 General Plan Annual Report Page 9
Progress on Implementing Housing Programs (Table D)
The 2023-2031 Housing Element’s action program includes 47 programs, many of which are ongoing City activities or will convert to on-going City activities once all action steps are taken.

Three programs (C, N, and I) have action items that were complete in 2023 and will convert into ongoing programs, 22 programs (A, B, D, E, F, G, J, L, M, Q, R, S, X, FF, HH, II, OO, PP, QQ, RR, SS, and TT) have action items that were underway in 2023, 12 programs (T, U, V, W, Z, BB, DD, GG, JJ, KK, MM, and NN) are ongoing, and10 programs (H, K, O, P, Y, AA, CC, EE, LL, and UU) have had no action taken in 2023.

Commercial Development Bonus Approved (Table E)
In 2023, Emeryville did not have any commercial projects that applied for a development bonus in exchange for contributing affordable housing, so the City did not need to identify sites.

Units Rehabilitated, Preserve and Acquired for Alternative Adequate Sites (Table F).

Emeryville did not have any sites that were substantially rehabilitated, preserved, or converted from non-affordable to affordable, so the City did not need to identify any sites.

Above Moderate-Income Units Converted to Moderate Income (Table F2).

Emeryville did not have any existing multifamily buildings converted to deed restricted rental housing for moderate-income households, so the City did not need to identify any sites.

Locally Owned Lands Included in the Housing Element Sites Inventory (Table G).

Emeryville did not dispose of any land that was identified in the Housing Element Site Inventory, so the City did not need to identify any sites.

Locally Owned Surplus Sites (Table H).

Emeryville has three locally owned sites (5890, 5900 and 6150 Christie Avenue, 4300 San Pablo Avenue and 3602 Adeline Street) that have been designated Exempt Surplus Land.

Table 2: Locally Owned Surplus Land
Address Existing Use # Existing Units Surplus
Designation
Parcel Size
5890, 5900 and
6150 Christie
Avenue
Public Facilities 0 Exempt Surplus
Land

2.22 acres
4300 San Pablo
AVenue
Other 0 Exempt Surplus
Land

0.47 acres
3602 Adeline Street
and 1102 36th Street
Vacant 0 Exempt Surplus
Land

0.05 acres
Lot Splits (Table I).

Emeryville 2023 General Plan Annual Report Page 10
Emeryville does not have a single-family zoning district nor has it received any requests to subdivide parcels into two equal parcels for residential use, so the City did not need to identify any sites.

Student Housing Development with a Density Bonus (Table J) Emeryville did not have any student housing development, so the City did not need to identify any sites.

Tenant Preference Policy (Table K)
Emeryville does have a local tenant preference policy, which can be found at https://www.codepublishing.com/CA/Emeryville/#!/Emeryville09/Emeryville095.html#9-5.408.

LEAP Reporting Table:

The City of Emeryville was awarded $65,000 in Local Early Action Planning (LEAP) funds to support the development of the 2023-2031 Housing Element. The City has requested reimbursement of the full grant amount.

Updated Site Inventory (Program JJ)
One of the programs in the Housing Element is to “update the site inventory list on an annual basis and post it on the City's website.” The tables below provided updated status for all of the sites included in Housing Element Tables 6-1, 6-2, and 6-3. The purpose of this update is to show progress on the projects listed in the Housing Element tables and new projects that have come up since the Housing Element was adopted. Per Program JJ, this information will be posted to the City website after it is submitted to the State.

Table 3: 2023-2031 Housing Element Site Inventory for Planned & Approved Projects Planned & Approved Projects Realistic Capacity Actual Permitted GAP Site
#
Project
Name Address Status EL VL Low Mod Mkt Total EL VL Low Mod Mkt Total 1 Baker Metal
Live/Work 1265 65th St
Construction
(2022) 0 0 0 0 17 17 0 0 0 0 17 17 0
2 Bayview
Emeryville
6701
Shellmound St
Complete
(2023) 0 8 0 0
17 8 186 0 8 0 0 178 186 0
3 The Emery
(Bldg. C)
1450 Sherwin
Ave
Complete
(2023) 0 4 5 12
10 1 122 0 4 5 12 101 122 0
4 The Emery
(Bldg. D)
1450 Sherwin
Ave
Complete
(2023) 0 6 13 12
15 3 184 0 6 13 12 153 184 0
5 65thSt Multiunit 1225 65th St Entitled (2022) 0 1 1 2 20 24 0 0 0 0 0 0 24 Emeryville 2023 General Plan Annual Report Page 11
6 Nellie
Hannon
Gateway
3600 San Pablo
Ave
Construction
(2023) 29 30 30 0 1 90 29 30 30 0 1 90 0
Planned & Approved Project Total 29 49 49 26
47 0 623 29
4 8 48 24 450 599 24
Table 4: 2023-2031 Housing Element Site Inventory for Vacant & Underutilized Sites Vacant & Underutilized Sites Site Inventory Goal Actual Permitted GAP Site
#
Existing
Use Address Status EL VL Low Mod Mkt Total EL VL Low Mod Mkt Total 7 Office
Building
5801-5861
Christie Ave
App.

Submitted
(2022) 0 4 6 7 81 98 0 0 0 0 0 0 98
8 Black and
White
Market
4053 San
Pablo Ave No Activity 4 4 4 14 38 64 0 0 0 0 0 0 64
9 Bank of
America
Lot
4100 San
Pablo Ave No Activity 1 1 1 5 13 21 0 0 0 0 0 0 21
10 Former
Recreation
Site
4300 San
Pablo Ave
Entitled
(2022) 23 22 22 0 1 68 0 0 0 0 0 0 68
11 East Bay
Bridge
Shopping
Ctr
3839 Hollis St,
3889 Emery
St, 3889 San
Pablo Ave No Activity 48 48 48 176 481 801 0 0 0 0 0 0 801 12 Powel St
Plaza
5701-5795
Christie Ave No Activity 49 49 49 180 491 818 0 0 0 0 0 0 818 13 Site B
1525-1535
Powell St,
5760-5770
Shellmound No Activity 108 108 108 107 107 538 0 0 0 0 0 0 538 14 Christie
Ave Sites
5890, 5900 &
6150 Christie
Ave
App.

Submitted
(2023) 60 60 60 60 60 300 0 0 0 0 0 0 300
15 US Spring
Site
3637 Adeline
St
App.

Submitted
(2021) 29 30 30 0 1 90 0 0 0 0 0 0 90
16 Michaels's
Site
3991 Hollis
St No Activity 6 6 6 22 60 100 0 0 0 0 0 0 100
17 Decathlon
Site
3938 Horton
St No Activity 4 4 4 15 41 68 0 0 0 0 0 0 68
18 Rug Depot/
Bon Motif 4056
Hubbard St,
No Activity 2 2 2 8 24 38 0 0 0 0 0 0 38
Emeryville 2023 General Plan Annual Report Page 12
4045 Horton
St
19 Office
Building
5850
Shellmound
St
App.

Withdrawn
(2023) 0 20 10 0 0 30 0 0 0 0 0 0 30
Vacant & Underutilized Sites Total 334 358 350 594 1,398 3,034 0 0 0 0 0 0 3,034 Table 5: 2023-2031 Housing Element Site Inventory for ADUs Accessory Dwelling Units (ADU) Site Inventory Goal Actual Permitted GAP
Site # Address Status EL VL Low Mod Mkt Total EL VL Low Mod Mkt Total NA
ANTICIPATED ADU(s)
Specific sites for ADUs are not identified in
the Housing Element.
0 0 10 10 10 30 0 0 0 0 28 28 2
3631 Adeline Street Permitted (2023) 0 0 0 0 1 1
5534 Beaudry Street Permitted (2023) 0 0 0 0 2 2
1015 47th Street Permitted (2023) 0 0 0 0 2 2
5517 Beaudry Street Permitted (2023) 0 0 0 0 1 1
5517 Beaudry Street Permitted (2023) 0 0 0 0 1 1
1331 40th Street Permitted (2023) 0 0 0 0 1 1
1321 40th Street Permitted (2023) 0 0 0 0 5 5
1231 40th Street Permitted (2023) 0 0 0 0 8 8
1221 40th Street Permitted (2023) 0 0 0 0 1 1
5883 Beaudry Street Permitted (2023) 0 0 0 0 1 1
3628 Adeline Street Permitted (2023) 0 0 0 0 1 1
1063 47th Street Permitted (2023) 0 0 0 0 1 1
3995 Emery Street Permitted (2023) 0 0 0 0 2 2
Table 6: 2023-2031 Housing Element Site Inventory Summary Table Projected Actual
GAP
EL VL Low Mod Mkt Total EL VL Low
Mo
d Mkt Total
Planned & Approved Project Total 29 49 49 26 470 623 29 48 48 24 450 599 24 Vacant & Underutilized Project Total 334 358 350 594 1,398 3,034 0 0 0 0 0 0 3,034 Emeryville 2023 General Plan Annual Report Page 13
Accessory Dwelling Units Total 0 0 10 10 10 30 0 0 0 0 28 28 2 Total 363 407 409 630 1,878 3,687 29 48 48 24 478 627 3,060 Emeryville 2023 General Plan Annual Report Page 14
Housing Successor Annual Report
The Housing Successor Annual Report shows that $930,065.60 was deposited into the Low- and Moderate-Income Housing Asset fund in Fiscal Year 2022-2023. Expenditures included $1,788,172.58 on low-income units, $397,371.69 on very low-income units, and $2,235,215.73 on extremely low-income units for a total of $4,420,760.00 on affordable housing development spending. The Housing Successor is working on developing three properties, which are in the pre-development phase (3602 Adeline Street, 6150 Christie Avenue, and 5890-5900 Christie Avenue). Requests for Proposals (RFP) were issued for all three sites and a developer was selected to redevelop 5890-5900 Christie Avenue and 6150 Christie Avenue.

Attached:

Development Decisions and Pending Projects in Emeryville in 2023 Appendix A - General Plan Annual Implementation Report
Appendix B - Housing Element Annual Progress Report
Appendix C - Housing Successor Annual Report
Project Address
Net New
Dwelling
Units
Thousands
sq. ft. NonresidentialPlanning
Application
Planning
Approval
Building
Permit
Application
Building
Permit
Issued
Completion/
Final
Inspection/
Occupancy
General
Plan Land
Use Notes
Projects with City Actions in 2023:

Convert Commercial to two Live/Work Units 5900 Hollis 20 10/13/23 12/20/23 MUR Use Permit Christie Ave Affordable Housing Project 5890, 5900, and 6160 Christie Ave 367 1.5 6/27/23 MUR SB 35
Accessory Dwelling Unit 3631 Adeline St 1 0 7/27/2023 8/17/2023 8/23/2023 11/07/23 MURS Zoning Comp.

Accessory Dwelling Unit 1015 47th St 2 0 5/1/2023 8/1/2023 8/2/2023 09/28/23 RM Zoning Comp.

Accessory Dwelling Unit 1331 40th Street 1 0 12/27/22 02/16/22 03/08/23 08/24/23 MUR Zoning Comp.

Accessory Dwelling Unit 1321 40th Street 50 12/27/22 02/16/22 03/08/23 08/24/23 MUR Zoning Comp.

Accessory Dwelling Unit 1231 40th Street 30 12/27/22 02/16/22 03/08/23 08/24/23 MUR Zoning Comp.

Accessory Dwelling Unit 1221 40th Street 1 0 12/27/22 02/16/22 03/08/23 08/24/23 MUR Zoning Comp.

Accessory Dwelling Unit 5883 Beaudry Stree 10 04/10/23 05/12/23 05/18/23 08/17/23 RM Zoning Comp.

Accessory Dwelling Unit 3624 Adeline 10 10/12/22 11/14/22 12/15/22 04/24/23 MURS Zoning Comp.

Junior Accessory Dwelling Unit 5517 Beaudry 10 10/3/22 10/12/22 1/17/23 9/21/23 RM Zoning Comp.

Accessory Dwelling Unit 5517 Beaudry 10 8/16/22 9/9/22 1/17/23 9/21/23 RM Zoning Comp.

Accessory Dwelling Unit 1063 47th St. 10 5/19/22 7/19/22 8/31/22 1/6/23 RM Zoning Comp.

Accessory Dwelling Unit 3995 Emery 20 4/21/22 5/19/22 6/14/22 1/3/23 8/10/2023 MUR Finaled/CO Bay Center Life Science Building 6425 - 75 Christie 0 210 2/2/22 8/24/23 MUN Approved Accessory Dwelling Unit 4300 Adeline St. 10 12/7/21 12/14/21 2/28/22 3/31/22 1/27/2023 RM Finaled/CO Accessory Dwelling Unit 1055 45th St. 10 9/15/21 09/24/201 10/18/21 2/9/22 RM Withdrawn in '23 Accessory Dwelling Unit 1284 61st St. 1 07/29/21 8/9/21 11/14/23 RM Zoning Comp.

Bay Street Grocery Store 5615 Bay St. 0 48.5 7/7/21 2/24/22 8/23/22 5/16/23 MUR Plaza Construct.

Accessory Dwelling Unit 4310 Adeline 1 06/23/21 8/9/21 9/21/21 8/15/23 RM Finaled/CO Marketplace Parcel B 5950 Shellmound 0 432 4/9/21 10/27/22 10/25/23 MUR Pavilion & Park Emerystation Overland R&D and Parking 1580 62nd St. 0 300 3/1/21 7/19/22 9/20/23 OT Building Ap.

Additional Unit 5534 Beaudry St. 1 0 11/28/20 04/30/21 04/29/21 07/30/21 08/03/23 RM Finaled/CO Two Accessory Dwelling Units 5534 Beaudry St. 2 0 11/28/20 04/30/21 04/30/21 10/19/23 RM Expired 04/16/23 Nellie Hannon Gateway Affordable Housing 3600 San Pablo 90 4 4/6/2020 10/20/20 11/15/21 05/09/23 MUR SB 35 Two New Units at Bridgecourt Apartments 1221 40th Street 20 11/12/19 2/11/20 2/14/20 6/30/20 6/21/2023 MUR Finaled/CO Sherwin-Williams Open space 4311 Hubbard St. 0 0 1/5/17 12/14/17 5/16/18 4/7/20 10/28/23 PO Address Change Sherwin-Williams (The Emery Building C) 4515 Hubbard St. 122 1 1/5/17 2/22/18 9/24/18 5/21/20 6/9/23 MUR Address Change Sherwin-Williams (The Emery) Building D 4610 Hubbard St. 184 0 1/5/17 2/22/18 9/24/18 4/22/20 6/26/23 MUR Address Change Bayview Apartments (Nady site) Residential 6701 Shellmound 186 0 11/7/14 3/24/16 7/9/20 5/28/21 12/6/23 MUR Finaled/CO Project Address
Net New
Dwelling
Units
Thousands
sq. ft. NonresidentialPlanning
Application
Planning
Approval
Building
Permit
Application
Building
Permit
Issued
Completion/
Final
Inspection/
Occupancy
General
Plan Land
Use Notes
Projects with No City Actions in 2023:

Accessory Dwelling Unit 1055 43rd St. 10 10/26/22 11/14/22 11/14/22 RM Zoning Comp.

Accessory Dwelling Unit 1251 1/2 63rd St. 10 8/12/22 9/8/22 10/11/22 RM Zoning Comp. 5801 & 5861 Christie Avenue Project 5801 Christie 98 464 1/3/22 MUR Application Duplex Conversion 1291 55th St. 1 09/7/21 1/27/22 6/30/22 RM Approved Four-Unit Replacement 1271 64th St. 0 06/23/21 12/21/21 3/3/22 RM Approved Life Sciences Tower 5850 Shellmound 30 388 5/10/21 MUR Withdrawn in '23 Marketplace Parcel A Shellmound site 5900 Shellmound 167 14 4/9/21 10/27/22 12/21/22 MUR Parking Demo/Rebuild Two Units 1270 64th Street 0 0 12/16/20 12/21/21 06/08/22 10/13/22 RM Construction Two Accessory Dwelling Units 1017 47th Street 20 11/20/20 03/05/21 03/12/21 06/22/21 RM Expired 02/15/23 Accessory Dwelling Unit 4210 Adeline 1 0 6/18/20 8/11/20 10/23/20 3/31/21 RM Two Accessory Dwelling Units 1203 54th Street 20 6/5/20 8/11/20 12/14/21 09/14/22 RM Expired 03/13/23 Accessory Dwelling Unit 1026 47th Street 1 0 1/21/20 2/20/20 RM Zoning Comp.

Emeryville Center of Innovation- B2 5300 Chiron Way 0 261.3 10/23/19 2/25/21 12/6/21 9/15/22 OT Superstructure Emeryville Center of Innovation- B8A 5300 Chiron Way 0 221 10/23/19 2/25/21 11/23/21 4/11/22 OT Grading Emeryville Center of Innovation- B8B 5300 Chiron Way 0 129.5 10/23/19 2/25/21 11/23/21 4/11/22 OT Grading Emeryville Center of Innovation- B14 5300 Chiron Way 0 parking 10/23/19 2/25/21 11/24/21 9/26/22 OT Superstructure Oceanview Townhomes - 3 replacing 1 1270 Ocean 2 0 5/2/16 7/24/18 4/9/19 7/23/21 RM Expired 08/09/23 Multi-Unit Residential 1225 65th St. 24 0 2/2/15 12/9/21 RMH Extension in '22 Baker Metal Live/Work 1265 65th 17 1 8/10/07 8/27/09 12/1/09 8/3/22 RMH Foundation Development Decisions and Pending Projects in Emeryville in 2023 * General Plan Land Uses: OT Office/Technology, P Public, PO Park/Open Space, MUR Mixed Use with Residential, MUN Mixed Use with Non Residential, RH High Density Residential, RMH Medium-High Density Residential, RM Medium-Density Residential