Cities Index.
Attachment A – Preliminary Project Plans

Emeryville City Council
September 17, 2024

Document
Attachment A – Preliminary Project Plans
Meeting
September 17, 2024
Body
Emeryville City Council
Original file
9.1 MB
Text extracted from the city's file for reading and search. Open the original on emeryville.legistar1.com. That file is the official record.

CITY OF EMERYVILLE, CALIFORNIA

DEPARTMENT OF PUBLIC WORKS
(E) STORMDRAIN

OUTFALL ALIGNMENT

EXISTING CONDITIONS
(E) STORMDRAIN

OUTFALL ALIGNMENT
Attachment B

CITY OF EMERYVILLE, CALIFORNIA

DEPARTMENT OF PUBLIC WORKS
(E) STORMDRAIN

OUTFALL ALIGNMENT
(E) STORMDRAIN

OUTFALL ALIGNMENT
~20ft sq DG viewing area, typ DG PATHWAY
5'-0" WIDE, TYP

DENOTES DISCARD RECEPTICLE AND

DOG WASTE BAG DISPENSERS, TYP AT

EACH LOCATION WHERE NEW PATH

MEETS EXISTING SIDEWALK DENOTES BIKE PARKING AREA, TYP

DENOTES BENCHES, TYP

DENOTES INTERPRETIVE SIGNAGE AT

EACH SEATING AREA, TYP

COBBLED-SWALE (NOT

GRANT-FUNDED)

TIDE BACKFLOW PREVENTION
DEVICE (ONE-WAY DUCKFLAP w/

MAINTENANCE ACCESS HOLE,

NOT GRANT-FUNDED)
DG "PLAZA" ARRANGE

MULTIPLE BENCHES TO

ENCOURAGE

SOCIALIZING WHILE

PRESERVING VIEWS

1. TRIM BACK/REMOVE INVASIVE

PLANTS AROUND NEW PATH AND

VIEWING PLATFORM

2. PLANT NATIVE SHRUBS

3. INSTALL "HABITAT CONSERVATION
AREA" SIGNS PROPOSED PROJECT

DEMO PLAZA AREA SLAB &
SIDEWALK. REPAIR SIDEWALK.

ADD BIKE PARKING, DG PLAZA
w/ EDGERS, AND INTERPRETIVE
SIGNAGE. REHABILITATE
PLANTER AND RE-PLANT TREE.

REMOVE (E)

DOWNED TREE
FOOTBRIDGE o/

COBBLED-SWALE
Denotes ~30ftx8ft wood
birdwatching platform

DEMO PLAZA AREA SLAB &
SIDEWALK. REPAIR SIDEWALK.

ADD BIKE PARKING, DG PLAZA
w/ EDGERS, AND INTERPRETIVE
SIGNAGE. REHABILITATE
PLANTER AND RE-PLANT TREE.

DENOTES APPROX ALIGNMENT OF
EQUALLY SPACED "HABITAT
CONSERVATION AREA" SIGNS, TYP.

REMOVE (E)

DOWNED TREE
Attachment B
Bid
Item
No. DESCRIPTION UNIT

ESTIMATED

QUANTITY UNIT PRICE ITEM TOTAL
1 Mobilization LS 1 $ 15,000.00 15,000.00$
2 Traffic Control LS 1 $ 5,000.00 5,000.00$
3 Stormwater Pollution Plan & Implementation LS 1 $ 5,000.00 5,000.00$ 4 Clear and Grub Pathways LS 1 $ 35,000.00 35,000.00$
5 Stabilized Decomposed Gravel Path + Edgers LS 1 $ 90,000.00 90,000.00$ 6 Shrub Planting LS 1 $ 10,000.00 10,000.00$
7 Interpretive Signage EA 7 $ 3,500.00 24,500.00$
8 Site Seating EA 6 $ 3,500.00 21,000.00$
9 Discard Recepticles EA 5 $ 3,200.00 16,000.00$
10 Dog Waste Bag Dispensers EA 5 $ 500.00 2,500.00$
11 Bird Watching Platform EA 1 $ 25,000.00 25,000.00$
12 Bicycle Parking and concrete pad EA 3 $ 3,000.00 9,000.00$ 13 Hardscaping and Improvements at Plazas LS 1 80,000.00$ 80,000.00$ 14 Habitat Conservation Area Caution Signs EA 6 $ 400.00 2,400.00$ 15 Pedestrian Footbridge at Cobbled-Swale EA 1 $ 15,000.00 15,000.00$ 16 Park Improvements Design & Environmental Assesment Fees EA 1 $ 120,000.00 120,000.00$ 17 City Stormdrain System Improvements (At City cost, no grant funding) LS 1 $ 150,000.00 150,000.00$ Subtotal = Grant-Funded Improvements 475,400.00$
Notes: Total Price Base Bid, including all Taxes, Permit and License Fees BASE BID TOTAL 625,400.00$

BID SHEET

CITY OF EMERYVILLE
McLaughlin Eastshore State Park Improvements and Cobbled Swale Project No. EPW 23-002
Units of measure and abbreviations are defined in Section One of the Standard Specifications

← All documents from this meeting