SWIMMING POOL
BUDGET ONLY
PREPARED FOR
DAN BANOWETZ (CONSULTANT)
PROJECT
EMERYVILLE CENTER OF COMMUNITY LIFE POOL RESURFACING
PROJECT
3535 N. Cornelia Ave.
Fresno, CA 93722
PREPARED BY
BURKETT’S POOL PLASTERING, INC.
Shane Speer
600 N. Frontage Rd.
Ripon, CA 95366
Phone: 209-604-5785
[email protected]
www.burkettspoolplastering.com
DATE PREPARED
10/29/2024
Quote is valid for (6) months
10/29/2024
TO: DAN BANOWETZ
Dan,
Per your request, attached is Burkett’s Pool Plastering, Inc’s budget for the Emeryville Center of Community Life Pool Resurfacing project. Below are item(s) to note for our budget:
- All Work Bid as Prevailing Wage Project
- No Additional PLA (Project Labor Agreement) or PSA (Project Stabilization Agreement)
- No Restricted Work Hours
- Pool Renovations at Ground Floor and Within 250’ of Truck - No Plans / No Spec(s)
Any scope of work not listed is not included in the attached budget. Please do not hesitate to contact me with any questions.
Thank you,
Shane Speer
Burkett’s Pool Plastering, Inc.
(209) 604-5785
[email protected]
PROJECT
SCOPE
POOL STRIP/LANES & TARGETS/REPLASTER BUDGET
- Permit from County Environmental Health Department
- Performance and Completion Bonds
- Strip Existing Plaster Down to the Original Concrete Substrate - Build and Set Scaffolds
- Remove and Replace Existing Main Drain Covers
- Remove and Replace Existing Floor Return Covers
- Remove and Replace (6) 12” 25 Racing Lanes
- Remove and Replace (12) 12” Targets
- Remove and Replace 4” Tile Band at the 4’6” Depth
- Remove and Replace Trim Tile on Shallow End Steps
- Reseal Gutter
- Replaster Pool with Wet Edge Altima White Interior Finish Upgrade POOL STRIP/LANES & TARGETS/REPLASTER BUDGET - $164,343.00