Cities Index.
Exhibit A to Resolution - Request Letter

Emeryville City Council
October 21, 2025

Document
Exhibit A to Resolution - Request Letter
Meeting
October 21, 2025
Body
Emeryville City Council
Pages
4
Original file
1.1 MB
Text extracted from the city's file for reading and search. Open the original on emeryville.legistar1.com. That file is the official record.

Seattle | Portland | Sacramento | Pleasanton | Irvine
7745 Greenback Ln Suite 250
Citrus Heights, CA 95610
P: 916.969.0900
F: 916.729.0900
deacon.com
CA# 760475
September 19, 2025
Attention: Chadrick Smalley
Community Development Director
City of Emeryville
1333 Park Avenue
Emeryville, CA 94608
RE: 3938 Horton Street
Noise Waiver Request
Dear Director Smalley,
We are requesting that the City of Emeryville approve the Noise Waiver Request for 3938 Horton Street.

The reason for requesting to do this work during non-business hours is to avoid having to run the seven RTUs on unstable generator power. Total Wine is closed between 9:00 pm and 9:00 am.

This PG&E shutdown will require a generator, either way, to provide power to Total Wine’s single-phase equipment, such as their walk-in coolers, box refrigerators, and computers, while the work is being completed. The HVAC system is the challenge.

HVAC units are not conducive to being run on generator power because generator power is unstable power, with fluctuating voltage and frequency. Doing this work during regular business hours has the real potential for damage to their seven HVAC units on the roof.

This request is based on the following:

Hours and Days of Work Requested
PG&E Revised Date: 12 Hours Dec. 4th-5th, 2025
Set Up Time: 8:00 pm to 10:00 pm
Work Time: 10:00 pm to 6:00 am
Breakdown Time: 6:00 am to 8:00 am
Exhibit A
Director Smalley

Page 2 ends

Type of Work to be Conducted
This work involves replacing a transformer located in the Northeast corner of the building. This requires shutting down power to the building while the work is being completed.

Work done before Shutdown
The transformer concrete pad has already been placed, the underground conduit has been installed and inspected, and trench plates currently cover the trench.

The electrician will set up and prepare the generator on the weekday (regular business hours) prior. The generator will not be run until the night of work.

Night of Shut Down
PG&E will disconnect the power at 10 pm.

The electricians will start up the generator.

PG&E will place the transformer, connect the existing primary lines to the new transformer, and energize the transformer.

HVAC units and any equipment that has multiple phases will be tested before turning on the new power
Crew Size
This will start with the crew showing up at 8 pm to set up. PG&E will have a four-person crew, the electrician will have a four-person crew, the HVAC subcontractor will have a one-person crew, and Deacon will have a superintendent onsite; a total of 10 individuals. All crew members will park on the opposite side of the building from where the residents on 40th street reside.

Type of Equipment to Be Used
Crane Truck
Light Tower
300 kW Generator
Location Where Work Will Take Place
Please see attached Plan C4.0 – Overall Site Plan.

Director Smalley

Page 3 ends

Anticipated Impacts
Anticipated Impacts include minimal crew talking, equipment noise, and minimal light pollution.
• Crane Truck rated at 55 dB – only needed to place the transformer • Light Tower rated at 45 dB – only required when doing PG&E work • 300 kW Generator rated at a range of 60-70 dB – duration of work Not all equipment will be running simultaneously.

The Light Tower will be pointed directly down at the electrical trench, which is necessary for the crew to work safely. This work area is in a planter.

Why the Waiver is Needed
The reason for requesting to do this work during non-business hours is to avoid having to run the seven RTUs on unstable generator power. Total Wine is closed between 9:00 pm and 9:00 am.

This PG&E shutdown will require a generator, either way, to provide power to Total Wine’s single-phase equipment, such as their walk-in coolers, box refrigerators, and computers, while the work is being completed.

HVAC units, on the other hand, are not conducive to being run on generator power because generator power is unstable power, with fluctuating voltage and frequency.

Doing this work during regular business hours has the real potential for damage to their seven HVAC units on the roof.

Director Smalley

Page 4 ends

We request the approval of this Noise Waiver. We are committed to creating a job site that is conscious, respectful, and committed to minimizing the impact on the surrounding neighbors.

Contact Person
Jeanine Fuller
Deacon Construction LLC
[email protected]
949.254.2250
Sincerely,
Jeanine Fuller
__________________________
Jeanine Fuller, Project Manager
Deacon Construction, LLC

YERBA BUENA AVENUE

HOLLIS STREET HI-VOLT
HORTON STREET AVAILABLE 18,543 S.F. 241 15 13 14 32 13 13 13 13 13 13 13 12 12 13 13 13 13 TOTAL WINE & MORE 26,171 S.F. 99.2830 150.7170 172.5067 172.8741 141.7885 25.3847 24.0913 25.3817 122.5067 40.3884 (INCL. 50% OF CORRIDOR/ COMMON/ ELEC. ROOM) (INCL. 50% OF CORRIDOR/ COMMON/ ELEC. ROOM) Work Area NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
NO

PARKING
Seal and Re-strip
Existing Parking Area
Mill and Overlay
Existing Parking Area USE CODE PROVIDED 9'x18' 1 SPACE / 500 SF per §17.116.080 PROPOSED PARKING ANALYSIS REQUIRED 44,714 S.F. / 200 = 90 SPACES 9'x18' RETAIL (Oakland) STALL SIZE TOTAL 135 SPACES 241 SPACES * AVAILABLE SPACE AND STORAGE AREAS CALCULATED AS RETAIL USE 3 SPACE / 1000 SF per Table 9-4.404 44,714 S.F. 3/1000 = 135 SPACES RETAIL (Emeryville) Permitting Notes: 1) GC responsible for submitting for and pulling permit for doing work within the ROW 2) GC responsible for submitting for and pulling all permits for site work city DRAWN BY: D R A W I N G N O . DATE: CHECKED BY: MAO DMZ (716) 886-0211 570 DELAWARE AVE., BUFFALO, NY 14202 PREPARED FOR SEAL PROPERTY NUMBER: AREA: - TITLE: CONSULTANT S P E C I A L I N F O R M A T I O N : ALL CONTRACTORS SHALL GUARANTEE THEIR WORK FOR A PERIOD OF ONE YEAR FROM THE DATE OF OWNERS ACCEPTANCE. SHOP DRAWING SUBMITTALS ARE REQUIRED FOR ANY AND ALL STRUCTURES. No. DATE BY REMARKS D R A W I N G R E V I S I O N S : UNAUTHORIZED ALTERATIONS OF THIS DOCUMENT ARE IN VIOLATION OF SECTION #7209 OF THE STATE EDUCATION LAW. N O T I C E SCALE: C4.0 Overall Site Plan # 5207 1" = 30'

SIDEWALK RENVOATIONS
3938 HORTON STREET
EMERYVILLE, CA 94608 04.09.2024 NORTH