Vendor · Energy
EV Range
Contract actions with EV Range in California city council documents since 2022 — also written as EV Range Inc; EV Range Inc..
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
6actions
4cities
$14,800approved (recorded vote)
$423,186proposed, no vote in the index
2022-07-13first action in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | City | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2025-03-26 | Cathedral City | Replacement of Electric Vehicle (EV) Charging Stations in the Cathedral City Parking Structure EV charging | Award | $14,800 not to exceed | four (4) Level 2 single-port EV chargers $2,960 per year | Approved 5-0 | staff report · agenda · minutes · packet · packet |
| 2024-08-13 | South Lake Tahoe | Contract for Electrical and Structural Engineering - Agreement with EV Range for Engineering & Design Services EV charging | Award | $423,186 | two dual Level 2 chargers at 1700 D Street, one Level 3 charger at 117… | No vote recorded | agenda · packet · packet · city original |
| 2024-07-25 | Portola | Amendment of Master License Agreement - EV charging stations EV charging | Amendment | — | No vote recorded | agenda · packet · city original | |
| 2023-12-20 | Mammoth Lakes | Agreements authorized to expand EV Charging Stations - EV Range for space at the Park n' Ride lot on Tavern Rd. EV charging | Award | — | Approved | packet · city original | |
| 2023-02-15 | Mammoth Lakes | EV Range lease agreement for Park n' Ride lot charging installation and permission to use Town land for grant-funded future installation EV charging | Award | — | Approved Carried (4 to 1) | minutes · packet · packet · city original | |
| 2022-07-13 | Portola | Master Charging Station Licensing Agreement / EV Range Inc EV charging | Award | — | two parking spots at the city square parking lot | Approved Aye Mayor Pat Morton, Aye Mayor Pro Tem Tom Cooley, Aye Councilmember Phil… | agenda · minutes · city original |