Vendor · Energy
Mesiti Miller Engineering
Contract actions with Mesiti Miller Engineering in California city council documents since 2022 — also written as Mesiti Miller Engineering, Inc.; Mesiti-Miller Engineering, Inc..
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
1actions
1cities
$25,000approved (recorded vote)
$0.00proposed, no vote in the index
2025-01-14first action in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | City | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2025-01-14 | Santa Cruz | Union/Locust Backup Generator Project (c702107) - Approval of Contract Amendment No. 2 for Design Services with Mesiti Miller Engineering, Inc. (WT) Microgrids and backup power | Amendment | $25,000 | Approved | agenda · minutes · packet · packet · packet |